Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-166000 | Agenda | agenda | WG Chairman |
S5-110 AI: 2 |
approved | [WTS] [JSN] | |||
S5-166001 | Report from last SA5 meeting | report | ETSI Secretariat |
S5-110 AI: 4.1 |
approved | [WTS] [JSN] | |||
S5-166002 | SA5 status report at last SA meeting | report | WG Chairman |
S5-110 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-166003 | SA5 results at last SA meeting | report | WG Chairman |
S5-110 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-166004 | Time Plan for OAM&P |
other revised to S5-166258 |
WG Vice Chair (Huawei) |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166005 | OAM Executive Report from THIS Meeting |
report revised to S5-166476 |
WG Vice Chair (Huawei) |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166006 | Leaders meeting agenda | agenda | WG Chairman |
S5-110 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-166007 | Leaders meeting minutes | report | WG Chairman |
S5-110 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-166008 | CH Agenda and Time Plan | agenda | CH SWG Chair |
S5-110 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-166009 | CH Executive Report from THIS Meeting | report | CH SWG Chair |
S5-110 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-166010 | SA5 Meeting Calendar | other | WG Vice Chair (Huawei) |
S5-110 AI: 5.4 |
noted | [WTS] [JSN] | |||
S5-166011 | SA5 Working Procedures | other | WG Vice Chair (Huawei) |
S5-110 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-166012 | SA5 Meeting Facility Requirements | other | WG Vice Chair (Orange) |
S5-110 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-166013 | Process for management of draft TSs/TRs | other | WG Chairman |
S5-110 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-166014 | CR Quality Check | other | ETSI Secretariat |
S5-110 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-166015 | Deliverables due for the NEXT SA Plenary | other | ETSI Secretariat |
S5-110 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-166016 | Ongoing SA5 WIDs and SIDs | other | WG Vice Chair (Huawei) |
S5-110 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-166017 | SA5 3GPP Work Plan | other | ETSI Secretariat |
S5-110 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-166018 | Minutes of New Work Item proposals - OAM&P | report | WG Vice Chair (Orange) |
S5-110 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-166019 | Minutes of OAM&P Maintenance and Rel-14 small Enhancements | report | MCC |
S5-110 AI: 6.3 |
noted | [WTS] [JSN] | |||
S5-166020 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | report | Rapporteur (Huawei) |
S5-110 AI: 6.5.4 |
noted | [WTS] [JSN] | |||
S5-166021 | Minutes for Study on Implementation for the Partitioning of Itf-N | report | Rapporteur(China Mobile) |
S5-110 AI: 6.5.3 |
noted | [WTS] [JSN] | |||
S5-166022 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions | report | Rapporteur(China Mobile) |
S5-110 AI: 6.4.1.1 |
noted | [WTS] [JSN] | |||
S5-166023 | Minutes for Configuration Management for mobile networks that include virtualized network functions | report | Rapporteur(ZTE) |
S5-110 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-166024 | Minutes for Fault Management for mobile networks that include virtualized network functions | report | Rapporteur(Huawei) |
S5-110 AI: 6.4.1.3 |
noted | [WTS] [JSN] | |||
S5-166025 | Minutes for Performance management for mobile networks that include virtualized network functions | report | Rapporteur(Intel) |
S5-110 AI: 6.4.1.4 |
noted | [WTS] [JSN] | |||
S5-166026 | Minutes for Lifecycle management for mobile networks that include virtualized network functions | report | Rapporteur (Nokia Networks) |
S5-110 AI: 6.4.1.5 |
noted | [WTS] [JSN] | |||
S5-166027 | Minutes for Filtering of PM measurements and data volume measurements for shared networks | report | Rapporteur(Ericsson) |
S5-110 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
S5-166028 | Minutes of Study on OAM support for assessment of energy efficiency in mobile access networks | report | Rapporteur (Orange) |
S5-110 AI: 6.5.1 |
noted | [WTS] [JSN] | |||
S5-166029 | Minutes for Study on OAM aspects of SON for AAS-based deployments | report | Rapporteur (Nokia Networks) |
S5-110 AI: 6.5.2 |
noted | [WTS] [JSN] | |||
S5-166030 | Minutes for Study on Management and Orchestration of Network Slicing | report | Rapporteur (Ericsson) |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |||
S5-166031 | Minutes for Study on management aspects of next generation network architecture and features | report | Rapporteur(Nokia) |
S5-110 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-166032 | IPR and legal declaration | other | WG Chairman |
S5-110 AI: 3 |
noted | [WTS] [JSN] | |||
S5-166033 | Status of email approvals | other | WG Vice Chair (Orange) |
S5-110 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-166034 | Minutes of OAM support for Licensed Shared Access (LSA) | report | Rapporteur (Nokia) |
S5-110 AI: 6.4.3 |
noted | [WTS] [JSN] | |||
S5-166035 | OAM SWG action list |
other revised to S5-166327 |
WG Vice Chair (Huawei) |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166036 | Work Plan status | other | WG Chair |
S5-110 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-166037 | Minutes of OAM&P SWG opening session | report | WG Vice Chair (Huawei) |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166038 | Minutes of Study on Management aspects of selected IoT-related features | report | Rapporteur (Cisco) |
S5-110 AI: 6.5.7 |
noted | [WTS] [JSN] | |||
S5-166039 | Minutes of Study on a RESTful HTTP-based Solution Set | report | Rapporteur (Nokia) |
S5-110 AI: 6.5.8 |
noted | [WTS] [JSN] | |||
S5-166040 | Minutes of Study on management aspects of virtualized network functions that are part of the NR | report | Rapporteur (Intel) |
S5-110 AI: 6.5.9 |
noted | [WTS] [JSN] | |||
S5-166041 | Resubmitted LS from SA2 to SA5-CH on implication on charging from eFMSS | LS in | S2-164279 |
S5-110 AI: 7.1 |
postponed | [WTS] [JSN] | |||
S5-166042 | Resubmitted LS from ETSI NFV to SA5 on NFV Interface and Architecture specifications |
LS in LS reply in S5-166424 |
ETSI ISG NFV |
S5-110 AI: 6.4.1.4 |
replied to | [WTS] [JSN] | |||
S5-166043 | LS from ETSI TC EE to 3GPP SA5 on Energy Efficiency in Mobile Networks | LS in | ETSI TC EE |
S5-110 AI: 6.5.1 |
noted | [WTS] [JSN] | |||
S5-166044 | LS from ETSI ISG NFV on informing about update to application view in IFA015 | LS in | ETSI ISG NFV |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166045 | LS from ETSI TC LI cc SA5 on Target Location | LS in | ETSI TC LI |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166046 | LS from ETSI ISG NFV to SA5 on Response to 3GPP on ETSI NFV Interface and Architecture specifications | LS in | ETSI ISG NFV |
S5-110 AI: 6.1 |
withdrawn | [WTS] [JSN] | |||
S5-166047 | LS from SA2 cc SA5 on I-WLAN handling and specification withdrawal | LS in | S2-165026 |
S5-110 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-166048 | LS from SA2 to SA5 on Informing charging system about 3GPP PS Data off status | LS in | S2-165432 |
S5-110 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-166049 | LS from SA4 to SA5 on QoE reporting for streaming services |
LS in LS reply in S5-166463 |
S4-161126 |
S5-110 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-166050 | LS from TSG SA cc SA5 on Cooperation on NGS FMC | LS in | SP-160743 |
S5-110 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-166051 | LS from ETSI ISG NFV on NFV-based solutions for next generation mobile networks |
LS in LS reply in S5-166260 |
ETSI ISG NFV |
S5-110 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-166052 | LS from ITU-T SG2 to SA5 on M.3020 upgrade (reply to S5-162323) |
LS in LS reply in S5-166386 |
ITU-T |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166053 | 3GPP SA5 Presentation for 2016 SON conference | report | SA5 Vice Chairman |
S5-110 AI: 4.3 |
noted | [WTS] [JSN] | |||
S5-166054 | Rel-8 CR 32.412 Correction of the information type for input parameter priority of the operation “Create measurement job” | CR | Ericsson | 32.412 8.0.0 CR#29 catF | OAM8 | Rel-8 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166055 | Rel-9 CR 32.412 Correction of the information type for input parameter priority of the operation “Create measurement job” | CR | Ericsson | 32.412 9.1.0 CR#30 catA | OAM8 | Rel-9 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166056 | Rel-10 CR 32.412 Correction of the information type for input parameter priority of the operation “Create measurement job” | CR | Ericsson | 32.412 10.0.0 CR#31 catA | OAM8 | Rel-10 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166057 | Rel-11 CR 32.412 Correction of the information type for input parameter priority of the operation “Create measurement job” | CR | Ericsson | 32.412 11.1.0 CR#32 catA | OAM8 | Rel-11 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166058 | Rel-12 CR 32.412 Correction of the information type for input parameter priority of the operation “Create measurement job” | CR | Ericsson | 32.412 12.0.0 CR#33 catA | OAM8 | Rel-12 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166059 | Rel-13 CR 32.412 Correction of the information type for input parameter priority of the operation “Create measurement job” | CR | Ericsson | 32.412 13.0.0 CR#34 catA | OAM8 | Rel-13 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166060 | Rel-13 CR 32.130 Add use cases and requirements for Management of measurements for cross-operator accounting based on data volume and QoS |
CR revised to S5-166400 |
Ericsson | 32.13 13.0.0 CR#1 catB | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-166061 | Rel-14 CR 32.425 Add measurements for cross-operator accounting based on data volume and QoS |
CR revised to S5-166401 |
Ericsson | 32.425 14.0.0 CR#163 catB | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-166062 | LS reply to ATIS on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” |
LS out LS To: ATIS NRSC revised to S5-166262 |
ORANGE, Huawei |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166063 | Rel-11 CR 28.622 Clarification on the need to show VsDataContainer self-containing itself several times | CR | ORANGE, Ericsson | 28.622 11.2.0 CR#8 catF | OAM11 | Rel-11 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166064 | Rel-12 CR 28.622 Clarification on the need to show VsDataContainer self-containing itself several times | CR | ORANGE, Ericsson | 28.622 12.1.0 CR#9 catA | OAM11 | Rel-12 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166065 | Rel-13 CR 28.622 Clarification on the need to show VsDataContainer self-containing itself several times | CR | ORANGE, Ericsson | 28.622 13.0.0 CR#10 catA | OAM11 | Rel-13 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166066 | Rel-13 CR 32.412 Add parameters for operation “Create measurement job” related to measurement filtering and measurement job reliability level |
CR revised to S5-166402 |
Ericsson | 32.412 13.0.0 CR#35 catB | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-166067 | Rel-13 CR 32.416 Add attributes corresponding to updated IS for operation “Create measurement job” related to measurement job reliability level |
CR revised to S5-171064, S5-171065 |
Ericsson | 32.416 13.1.0 CR#6 catB | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
not pursued | [WTS] [JSN] |
S5-166068 | SA5 work plan structure | discussion | SA5 vice chairman | Rel-15 |
S5-110 AI: 5.5 |
endorsed | [WTS] [JSN] | ||
S5-166069 | SA5 LS handling process | discussion | SA5 vice chairman |
S5-110 AI: 5.1 |
withdrawn | [WTS] [JSN] | |||
S5-166070 | pCR 32.856 Proposed text for clause 4 – Update some support status and add title to tables | pCR | ORANGE | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-166071 | pCR 32.856 proposed text for clause 4.4.3.3 Determination of coverage area | pCR | ORANGE | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-166072 | pCR 32.856 proposed text for clause 4.6 Assessment report |
pCR revised to S5-166331 |
ORANGE | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
revised | [WTS] [JSN] | ||
S5-166073 | Rel-14 CR 32.298 Correction on P-CSCF and IBCF for ATCF specific fields | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 14.0.0 CR#601 catF | UCHIMS_AS-SRVCC, CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166074 | Rel-10 CR 32.298 Correction on OMR attributes per media in IMS Charging |
CR revised to S5-166391 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 10.19.0 CR#602 catF | OMR | Rel-10 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166075 | Rel-11 CR 32.298 Correction on OMR attributes per media in IMS Charging |
CR revised to S5-166392 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 11.16.0 CR#603 catA | OMR | Rel-11 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166076 | Rel-12 CR 32.298 Correction on OMR attributes per media in IMS Charging |
CR revised to S5-166393 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 12.11.0 CR#604 catA | OMR | Rel-12 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166077 | Rel-13 CR 32.298 Correction on OMR attributes per media in IMS Charging |
CR revised to S5-166394 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.5.0 CR#605 catA | OMR | Rel-13 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166078 | Rel-14 CR 32.298 Correction on OMR attributes per media in IMS Charging | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 14.0.0 CR#606 catA | OMR | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166079 | Rel-9 CR 32.260 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.26 9.19.0 CR#365 catF | CH9 | Rel-9 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166080 | Rel-10 CR 32.260 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.26 10.15.0 CR#366 catA | CH9 | Rel-10 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166081 | Rel-11 CR 32.260 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.26 11.17.0 CR#367 catA | CH9 | Rel-11 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166082 | Rel-12 CR 32.260 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.26 12.10.0 CR#368 catA | CH9 | Rel-12 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166083 | Rel-13 CR 32.260 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.26 13.6.0 CR#369 catA | CH9 | Rel-13 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166084 | Rel-9 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revised to S5-166344 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 9.22.0 CR#747 catF | CH9 | Rel-9 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166085 | Rel-10 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revised to S5-166345 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 10.18.0 CR#748 catA | CH9 | Rel-10 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166086 | Rel-11 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revised to S5-166346 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 11.18.0 CR#749 catA | CH9 | Rel-11 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166087 | Rel-12 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revised to S5-166388 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 12.11.0 CR#750 catA | CH9 | Rel-12 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166088 | Rel-13 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revised to S5-166389 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.6.0 CR#751 catA | CH9 | Rel-13 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166089 | Rel-14 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revised to S5-166390 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.1.0 CR#752 catA | CH9 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166090 | Rel-9 CR 32.298 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 9.22.0 CR#607 catF | CH9 | Rel-9 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166091 | Rel-10 CR 32.298 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 10.19.0 CR#608 catA | CH9 | Rel-10 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166092 | Rel-11 CR 32.298 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 11.16.0 CR#609 catA | CH9 | Rel-11 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166093 | Rel-12 CR 32.298 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 12.11.0 CR#610 catA | CH9 | Rel-12 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166094 | Rel-13 CR 32.298 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.5.0 CR#611 catA | CH9 | Rel-13 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166095 | Rel-14 CR 32.298 Correction on Requested Party Address for Emergency IMS session | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 14.0.0 CR#612 catA | CH9 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166096 | Rel-13 CR 32.298 Correction on ASN.1 in PS domain CDRs |
CR revised to S5-166338 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.5.0 CR#613 catF | CH13 | Rel-13 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166097 | Rel-14 CR 32.298 Correction on ASN.1 in PS domain CDRs |
CR revised to S5-166339 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 14.0.0 CR#614 catF | CH13 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166098 | Rel-14 CR 32.240 Correction on NOTE related to Inter Operator Identification (IOI) | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.24 14.1.0 CR#390 catF | CH14, IMS2-CH | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166099 | Rel-13 CR 32.299 Correction on duplicate values for Change-Condition | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.6.0 CR#753 catF | CIoT-CH | Rel-13 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166100 | Rel-14 CR 32.299 Correction on duplicate values for Change-Condition | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.1.0 CR#754 catA | CIoT-CH | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166101 | Draft CR 32.103 Alignment with latest SA5 specification list and various enhancements |
draftCR revised to S5-166264 |
Huawei, Ericsson | Rel-13 |
S5-110 AI: 6.3 |
revised | [WTS] [JSN] | ||
S5-166102 | pCR 32.856 Proposed text for clause 4.7 Conclusion |
pCR revised to S5-166347 |
ORANGE | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
revised | [WTS] [JSN] | ||
S5-166103 | Completion of Rel-14 NFV work | discussion | SA5 vice chairman | Rel-14 |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | ||
S5-166104 | pCR TR 32.880 Comparative analysis of protocols on complexity and performance | pCR | China Mobile Com. Corporation | 32.88 0.4.0 |
S5-110 AI: 6.5.3 |
approved | [WTS] [JSN] | ||
S5-166105 | pCR to TR 28.525 Create NS Identifier |
pCR revised to S5-166313 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166106 | pCR to TR 28.525 Create a new version of already on-boarded PNFD |
pCR revised to S5-166314 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166107 | pCR to TR 28.525 Update the user defined data on PNFD |
pCR revised to S5-166315 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166108 | pCR to TR 28.525 Delete the PNFD |
pCR revised to S5-166316 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166109 | pCR to TR 28.525 Query the PNFD |
pCR revised to S5-166317 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166110 | pCR to TR 28.525 Subscribe to NSD changes notifications |
pCR revised to S5-166318 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166111 | pCR to TR 28.525 Notify on NSD Management changes operation |
pCR revised to S5-166319 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166112 | Discussion Paper on possible IoT Management Use Cases | discussion | Cisco Systems Inc. |
S5-110 AI: 6.5.7 |
noted | [WTS] [JSN] | |||
S5-166113 | pCR to TR 32.857 Scope section |
pCR revised to S5-166404 |
Cisco Systems Inc. | 32.857 0.0.0 |
S5-110 AI: 6.5.7 |
revised | [WTS] [JSN] | ||
S5-166114 | pCR 32.856 Proposed text for clause 5.2 Analysis of control-monitoring information |
pCR revised to S5-166348 |
ORANGE, Huawei | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
revised | [WTS] [JSN] | ||
S5-166115 | pCR 32.856 Proposed text for clause 5.3 Potential use cases |
pCR revised to S5-166349 |
ORANGE, Deutsche Telekom, Huawei, Vodafone | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
revised | [WTS] [JSN] | ||
S5-166116 | pCR 32.856 Proposed text for clause 5.4 Potential requirements |
pCR revised to S5-166350 |
ORANGE | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
revised | [WTS] [JSN] | ||
S5-166117 | LS on ES 202 336-12 – Comments on Figure 1 and clarification needed on potential use case |
LS out LS To: ETSI EE 02 revised to S5-166351 |
ORANGE |
S5-110 AI: 6.5.1 |
revised | [WTS] [JSN] | |||
S5-166118 | pCR to TR 32.865 Cell splitting correction | pCR | Cisco Systems Inc. | 32.865 1.0.0 |
S5-110 AI: 6.5.2 |
noted | [WTS] [JSN] | ||
S5-166119 | pCR to TR 32.865 Management of SP-Cells |
pCR revised to S5-166353 |
Cisco Systems Inc. | 32.865 1.0.0 |
S5-110 AI: 6.5.2 |
revised | [WTS] [JSN] | ||
S5-166120 | LS from NGMN to SA5 on Update to NGMN Description of Network Slicing Concept | LS in | NGMN Alliance |
S5-110 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-166121 | LS from IETF to SA5 on clarification on RFC 4006 for Diameter Base Protocol |
LS in LS is reply to S5-162220 |
IETF DIME WG |
S5-110 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-166122 | LS from ITU-T to 3GPP on seeking collaboration on draft Recommendation “Energy efficiency Metrics and measurement methodology for 5G solutions | LS in | ITU-T |
S5-110 AI: 6.1 |
withdrawn | [WTS] [JSN] | |||
S5-166123 | Reply LS from RAN2 cc SA5 on QoE reporting for streaming services | LS in | R2-167245 |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166124 | Reply LS from RAN3 to SA5 on the study of the management of RAN virtualized network functions | LS in | R3-162617 |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166125 | LS from RAN3 to SA5 on Flexible eNB-ID and Cell-ID in E-UTRAN |
LS in LS reply in S5-166304 |
R3-162637 |
S5-110 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-166126 | LS from SA6 to SA5 on Charging for Mission Critical Services | LS in | S6-161256 |
S5-110 AI: 7.1 |
postponed | [WTS] [JSN] | |||
S5-166127 | pCR to TS 28.525 alignment with published ETSI NFV specifications | pCR | Nokia Networks | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166128 | pCR to TS 28.526 alignment with published ETSI NFV specifications | pCR | Nokia Networks | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166129 | pCR to TS 28.526 add scope section |
pCR revised to S5-166320 |
Nokia Networks | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166130 | pCR to TS 28.527 add introduction section | pCR | Nokia Networks | 28.527 0.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166131 | pCR to TS 28.527 add scope section |
pCR revised to S5-166321 |
Nokia Networks | 28.527 0.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166132 | pCR to TS 28.528 add introduction section | pCR | Nokia Networks | 28.528 0.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166133 | pCR to TS 28.528 add scope section |
pCR revised to S5-166322 |
Nokia Networks | 28.528 0.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166134 | Draft TR 32.864 Skeleton proposal |
draft TR revised to S5-166405 |
Intel Corporation (UK) Ltd | Rel-14 |
S5-110 AI: 6.5.9 |
revised | [WTS] [JSN] | ||
S5-166135 | pCR TR 32.864 adding introduction and scope |
pCR revised to S5-166406 |
Intel Corporation (UK) Ltd | 32.864 0.0.0 |
S5-110 AI: 6.5.9 |
revised | [WTS] [JSN] | ||
S5-166136 | pCR TS 28.520 revision of a requirement |
pCR revised to S5-166312 |
Intel Corporation (UK) Ltd | 28.52 1.1.0 |
S5-110 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-166137 | pCR draft TS 28.510 change the version of the IFA specs | pCR | ZTE Corporation | 28.51 1.1.0 |
S5-110 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-166138 | pCR draft TS 28.510 remove the editor's notes |
pCR revised to S5-166272 |
ZTE Corporation | 28.51 1.1.0 |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-166139 | pCR draft TS 28.510 move one requirement to business level |
pCR revised to S5-166271 |
ZTE Corporation | 28.51 1.1.0 |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-166140 | pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated | pCR | ZTE Corporation | 28.511 0.5.0 |
S5-110 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-166141 | pCR draft TS 28.512 Add description about interface definition | pCR | ZTE Corporation | 28.512 0.1.0 |
S5-110 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-166142 | Discussion paper - enhancement of NRM to support the VNF |
discussion revised to S5-166399 |
ZTE Corporation, Intel |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-166143 | R14 CR TS 28.621 Adding the generic configuration requirement to support management of VNFs |
CR revised to S5-166279 |
ZTE Corporation, Intel | 28.621 13.0.0 CR#3 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] |
S5-166144 | R14 CR TS 28.622 Adding an attribute for ManagedElement to support management of virtualized NE | CR | ZTE Corporation, Intel | 28.622 13.0.0 CR#11 catF | OAM14-MAMO_VNF-CM | Rel-14 |
S5-110 AI: 6.4.1.2 |
not pursued | [WTS] [JSN] |
S5-166145 | R14 CR TS 28.623 Adding an attribute for ManagedElement to support management of virtualized NE | CR | ZTE Corporation, Intel | 28.623 13.2.0 CR#12 catF | OAM14-MAMO_VNF-CM | Rel-14 |
S5-110 AI: 6.4.1.2 |
not pursued | [WTS] [JSN] |
S5-166146 | Update the description of architecture options for TR 32.865 |
pCR revised to S5-166183 |
Nokia Networks Oy | 32.865 1.0.0 |
S5-110 AI: 6.5.2 |
revised | [WTS] [JSN] | ||
S5-166147 | pCR TR 28.800 Add terminologies for management and orchestration of network function and resource |
pCR revised to S5-166355 |
Huawei Technologies | 28.8 0.3.0 | FS_NGNS_MOA |
S5-110 AI: 6.5.4 |
revised | [WTS] [JSN] | |
S5-166148 | pCR TR 28.801 Add use case for service request for a slice instance |
pCR revised to S5-166375 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166149 | pCR TR 28.801 Add network slice sharing use case |
pCR revised to S5-166376 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166150 | pCR TR 28.801 Adding use case and requirements for E2E network slice supporting end user services |
pCR revised to S5-166377 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166151 | pCR TR 28.801 Adding management support use case for slice selection | pCR | Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166152 | pCR TR 28.801 Add use case for policy configuration |
pCR revised to S5-166378 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166153 | pCR TR 28.801 Add requirements and use case for informing network slice instance change | pCR | Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166154 | pCR TR 28.801 Add requirements and update use case for creating a network slice instance |
pCR revised to S5-166371 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166155 | pCR TR 28.801 Add requirements and update use case for modifying a network slice instance |
pCR revised to S5-166373 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166156 | pCR TR 28.801 Add requirements and update use case for terminating a network slice instance |
pCR revised to S5-166374 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166157 | pCR TR 28.801 Add general requirements for network slice lifecycle management |
pCR revised to S5-166379 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166158 | pCR TR 28.801 Network slice type impact on network management system | pCR | Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166159 | pCR TR 28.801 Possible network slice creation methods with shared NFs |
pCR revised to S5-166383 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166160 | pCR TR 28.801 Possible network slice creation methods without shared NFs |
pCR revised to S5-166382 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166161 | pCR TR 28.801 Update on the Network slice instance lifecycle |
pCR revised to S5-166359 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166162 | pCR TS 28.510 Adding requirement and use case for createMO with VNF instance identifier |
pCR revised to S5-166273 |
Huawei Technologies | 28.51 1.1.0 | OAM14-MAMO_VNF-CM |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |
S5-166163 | pCR TS 28.511 Adding procedure flow for createMO with VNF instance identifier |
pCR revised to S5-166275 |
Huawei Technologies | 28.511 0.5.0 | OAM14-MAMO_VNF-CM |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |
S5-166164 | pCR TS 28.517 Rapporteur changes | pCR | Huawei Technologies | 28.517 0.3.0 | OAM14-MAMO_VNF-FM |
S5-110 AI: 6.4.1.3 |
approved | [WTS] [JSN] | |
S5-166165 | Add information to description of Management reference model in TS 32.101 |
discussion revised to S5-166265 |
Ericsson | OAM14 |
S5-110 AI: 6.3 |
revised | [WTS] [JSN] | ||
S5-166166 | Discussion on volume based charging of VoLTE | discussion | China Mobile Com. Corporation |
S5-110 AI: 7.3 |
noted | [WTS] [JSN] | |||
S5-166167 | Rel-13 CR 32.260 Add charging support for roaming architecture for voice over IMS with home routed traffic |
CR revised to S5-166295 |
China Mobile Com. Corporation | 32.26 13.6.0 CR#370 catF | Rel-13 |
S5-110 AI: 7.4.4 |
revised | [WTS] [JSN] | |
S5-166168 | Presentation TS 28.500 to SA for approval | report | China Mobile Com. Corporation |
S5-110 AI: 6.4.1.1 |
approved | [WTS] [JSN] | |||
S5-166169 | pCR TS 28.500 techenical and editorial update on 28500-120 |
pCR revised to S5-166270 |
China Mobile Com. Corporation | 28.5 1.2.0 |
S5-110 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-166170 | pCR TS 28.526 Procedure of VNF instantiation through Os-Ma-nfvo |
pCR revised to S5-166323 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166171 | pCR TR 28.800 Add use case for management support of UDM | pCR | Huawei Technologies | 28.8 0.3.0 | FS_NGNS_MOA |
S5-110 AI: 6.5.4 |
noted | [WTS] [JSN] | |
S5-166172 | pCR TR 28 800 Add management architecture use case | pCR | Huawei Technologies | 28.8 0.3.0 | FS_NGNS_MOA |
S5-110 AI: 6.5.4 |
noted | [WTS] [JSN] | |
S5-166173 | pCR TS 28.526 Procedure of NS instantiation |
pCR revised to S5-166324 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166174 | pCR TS 28.526 Procedure of updating an NS instance to correspond to a different NSD version |
pCR revised to S5-166325 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166175 | pCR TS 28.526 Procedure of VNF scaling through Os-Ma-nfvo |
pCR revised to S5-166326 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166176 | pCR TR 28.802 Add use case for supporting cric management case | pCR | Huawei Technologies | 28.802 0.2.0 |
S5-110 AI: 6.5.6 |
noted | [WTS] [JSN] | ||
S5-166177 | pCR TS 28.511 Procedure of querying VNF instance information through Os-Ma-nfvo |
pCR revised to S5-166276 |
NTT DOCOMO | 28.511 0.5.0 |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-166178 | pCR TS 28.511 Procedure of querying VNF instance information through Ve-Vnfm-em |
pCR revised to S5-166277 |
NTT DOCOMO | 28.511 0.5.0 |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-166179 | pCR TS 28.511 Procedures of modifying non-application VNF instance information and configuration through Os-Ma-nfvo |
pCR revised to S5-166278 |
NTT DOCOMO | 28.511 0.5.0 |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-166180 | pCR TS 28.516 Procedure of VNF Healing through Ve-Vnfm-em |
pCR revised to S5-166282 |
NTT DOCOMO | 28.516 1.1.0 |
S5-110 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-166181 | pCR TS 28.525 Addressing Note in use case clause 6.4.1.3.1 | pCR | NTT DOCOMO | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
noted | [WTS] [JSN] | ||
S5-166182 | pCR TS 28.515 Adding missing traceability between use case and requirements | pCR | NTT DOCOMO | 28.515 1.0.0 |
S5-110 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-166183 | pCR for TR 32.865 Update description of potential architecture options |
pCR revision of S5-166146 revised to S5-166354 |
Nokia Networks Oy | 32.865 1.0.0 | FS_OAM_SON_AAS |
S5-110 AI: 6.5.2 |
revised | [WTS] [JSN] | |
S5-166184 | pCR TR 28.800 – Model of roles, use cases and architecture for network slice management | pCR | ORANGE | 28.8 0.3.0 |
S5-110 AI: 6.5.4 |
noted | [WTS] [JSN] | ||
S5-166185 | pCR for TR 32.865 update clause of Conclusion and Recommendations | pCR | Nokia Networks Oy | 32.865 1.0.0 | FS_OAM_SON_AAS |
S5-110 AI: 6.5.2 |
noted | [WTS] [JSN] | |
S5-166186 | Presentation TR 32.865 to SA for information | TS or TR cover | Nokia Networks Oy | FS_OAM_SON_AAS | Rel-14 |
S5-110 AI: 6.5.2 |
approved | [WTS] [JSN] | |
S5-166187 | pCR for TR 28.802 Add a use case to support management of Service Hosting Environment | pCR | Nokia Networks Oy | 28.802 0.2.0 | FS_MAN_NGNAF |
S5-110 AI: 6.5.6 |
withdrawn | [WTS] [JSN] | |
S5-166188 | pCR for TR 28.802 Add use cases to support management for New RAN architecture |
pCR revised to S5-166398 |
Nokia Networks Oy | 28.802 0.2.0 | FS_MAN_NGNAF |
S5-110 AI: 6.5.6 |
revised | [WTS] [JSN] | |
S5-166189 | New SID Study of Management of CUPS | SID new | Huawei Technologies | Rel-15 |
S5-110 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-166190 | Scope update | pCR | RED Technologies SAS | 28.302 0.1.0 | OAM14-LSA |
S5-110 AI: 6.4.3 |
noted | [WTS] [JSN] | |
S5-166191 | Exemplary flows |
pCR revised to S5-166307 |
RED Technologies SAS | 28.302 0.1.0 | FS_OAM_LSA |
S5-110 AI: 6.4.3 |
revised | [WTS] [JSN] | |
S5-166192 | IOC definition |
pCR revised to S5-166310 |
RED Technologies SAS | 28.302 0.1.0 | OAM14-LSA |
S5-110 AI: 6.4.3 |
revised | [WTS] [JSN] | |
S5-166193 | Rel-14 CR 32.150 Correct wrong reference |
CR revised to S5-166266 |
Ericsson LM | 32.15 13.1.0 CR#26 catF | OAM13 | Rel-13 |
S5-110 AI: 6.3 |
revised | [WTS] [JSN] |
S5-166194 | Cell parameters definition |
pCR revised to S5-166311 |
RED Technologies SAS | 28.302 0.1.0 | OAM14-LSA |
S5-110 AI: 6.4.3 |
revised | [WTS] [JSN] | |
S5-166195 | pCR 28.801 add Introduction chapter 6 |
pCR revised to S5-166357 |
Ericsson LM | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166196 | 28.512 Discussion paper on LCM parameters modeling for VNF instantiation triggered by MO creation | discussion | Intel Corporation (UK) Ltd |
S5-110 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-166197 | pCR TR 28.801 Terminology update |
pCR revised to S5-166358 |
Ericsson LM,Huawei | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166198 | Entities with multiple roles |
discussion revised to S5-166267 |
Ericsson |
S5-110 AI: 6.3 |
revised | [WTS] [JSN] | |||
S5-166199 | Entities with multiple roles | discussion | Ericsson |
S5-110 AI: 6.3 |
withdrawn | [WTS] [JSN] | |||
S5-166200 | Discussion on Service Performance Reporting (SPR) mechanism in NR | discussion | Ericsson |
S5-110 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-166201 | End user service PM information via the UE |
pCR revised to S5-166403 |
Ericsson | 28.802 0.2.0 |
S5-110 AI: 6.5.6 |
revised | [WTS] [JSN] | ||
S5-166202 | Add relation between Modify MO attributes and VNF Scaling |
pCR revised to S5-166274 |
Intel Corporation (UK) Ltd | 28.51 1.1.0 |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-166203 | pCR 28.511 procedure of modify MO attributes | pCR | Intel Corporation (UK) Ltd | 28.511 0.5.0 |
S5-110 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-166204 | Replacing the reference to LS with reference to TS 36.300 |
CR revised to S5-166305 |
Ericsson | 32.817 14.0.0 CR#1 catF | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-166205 | Enrichment of use case on performance measurement collection of VNF PM data related to VR | pCR | Intel Corporation (UK) Ltd | 28.52 1.1.0 |
S5-110 AI: 6.4.1.4 |
noted | [WTS] [JSN] | ||
S5-166206 | Add use case on designating managing NM and managing EM for VNFs | pCR | Intel Corporation (UK) Ltd | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
noted | [WTS] [JSN] | ||
S5-166207 | LS from BBF to SA5 on Publication of TR-196i2 Corrigendum 3 | LS in | BBF |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166208 | pCR 28.801 Use case and Requirement Monitor performance of a network slice instance |
pCR revised to S5-166360 |
Ericsson LM, Huawei | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166209 | pCR 28.801 Use case and Requirement Supervise network slice instance |
pCR revised to S5-166365 |
Ericsson LM,Huawei | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166210 | pCR 28.801 Use case and Requirement Uplift network slice instance | pCR | Ericsson LM | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166211 | pCR 28.801 Use case and Requirements for Prepare introduction of new feature in a network slice instance | pCR | Ericsson LM | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166212 | pCR TR 28.801 Add general requirements for network slice subnet lifecycle management | pCR | Ericsson LM | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166213 | Rel-13 pCR for dCR 32156 Minor corrections | other | Ericsson LM |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] | |||
S5-166214 | pCR for dCR 32157 Include Interface IRP template |
other revised to S5-166268 |
Ericsson LM |
S5-110 AI: 6.3 |
revised | [WTS] [JSN] | |||
S5-166215 | Rel-13 CR 28.732 Correct the usage of isNullable and multiplicity property | CR | Ericsson LM | 28.732 13.0.0 CR#3 catF | OAM13 | Rel-13 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166216 | pCR 28.302 – Add System Context for interface between LC and NM |
pCR revised to S5-166372 |
Nokia Networks | 28.302 0.1.0 |
S5-110 AI: 6.4.3 |
revised | [WTS] [JSN] | ||
S5-166217 | pCR 28.302 - Add operations for scenario 1 | pCR | Nokia Networks | 28.301 0.4.0 |
S5-110 AI: 6.4.3 |
withdrawn | [WTS] [JSN] | ||
S5-166218 | Skeleton for 32.866 | draft TR | Nokia Networks | Rel-14 |
S5-110 AI: 6.5.8 |
approved | [WTS] [JSN] | ||
S5-166219 | LS reply to LS on Informing charging system about 3GPP PS Data off status |
LS out revised to S5-166299 |
Huawei Technologies |
S5-110 AI: 7.1 |
revised | [WTS] [JSN] | |||
S5-166220 | LS from ETSI NFV to SA5 on SOL WG work plan schedule |
LS in LS reply in S5-166263 |
ETSI ISG NFV |
S5-110 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-166221 | New WID Charging for SMS via T4 |
WID new revised to S5-166285 |
Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 |
S5-110 AI: 7.2 |
revised | [WTS] [JSN] | ||
S5-166222 | New WID Charging aspects for Diameter Base Protocol Specification Update |
WID new revised to S5-166286 |
Nokia, Alcatel-Lucent Shanghai Bell |
S5-110 AI: 7.2 |
revised | [WTS] [JSN] | |||
S5-166223 | Rel-13 CR 32.260 Clarification on location of P-CSCF and CDF in message flows |
CR revised to S5-166296 |
China Mobile Com. Corporation | 32.26 13.6.0 CR#371 catF | CH14-V8 | Rel-13 |
S5-110 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-166224 | Rel-14 CR 32.251 Addition of charging support for Mulitiple PRAs |
CR revised to S5-166300 |
Huawei Technologies | 32.251 14.0.1 CR#480 catB | AULC-CH | Rel-14 |
S5-110 AI: 7.4.5 |
revised | [WTS] [JSN] |
S5-166225 | Rel-14 CR 32.298 Addition of charging support for Mulitiple PRAs |
CR revised to S5-166301 |
Huawei Technologies | 32.298 14.0.0 CR#615 catB | AULC-CH | Rel-14 |
S5-110 AI: 7.4.5 |
revised | [WTS] [JSN] |
S5-166226 | Rel-14 CR 32.277 Correction on the ProSe offline Charging |
CR revised to S5-166291 |
Huawei Technologies | 32.277 14.0.1 CR#20 catB | CH14-ProSe | Rel-14 |
S5-110 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-166227 | Rel-14 CR 32.277 Addition of session based charging for ProSe one-to-one communication |
CR revised to S5-166293 |
Huawei Technologies | 32.277 14.0.1 CR#21 catB | CH14-ProSe | Rel-14 |
S5-110 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-166228 | Rel-14 CR 32.277 Addtion of the triggers for ProSe charging |
CR revised to S5-166292 |
Huawei Technologies | 32.277 14.0.1 CR#22 catB | CH14-ProSe | Rel-14 |
S5-110 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-166229 | Rel-14 CR 32.277 Addition of Message flow for ProSe Direct Discovery for Public Safety use |
CR revised to S5-166294 |
Huawei Tech.(UK) Co., Ltd | 32.277 14.0.1 CR#23 catB | CH14-ProSe | Rel-14 |
S5-110 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-166230 | Discussion Paper on the charging enhancement for 3GPP PS Data off | discussion | Huawei Technologies |
S5-110 AI: 7.3 |
noted | [WTS] [JSN] | |||
S5-166231 | Rel-14 CR 32.251 Charging enhancement for 3GPP PS Data off | CR | Huawei Technologies | 32.251 14.0.1 CR#481 catB | Rel-14 |
S5-110 AI: 7.3 |
not pursued | [WTS] [JSN] | |
S5-166232 | Revised WID on Charging Aspects of S8 Home Routing Architecture for VoLTE |
WID revised revised to S5-166287 |
China Mobile Com. Corporation | V8, V8-CT |
S5-110 AI: 7.2 |
revised | [WTS] [JSN] | ||
S5-166233 | Rel-14 pCR 32.870 skeleton study on forward compatibility Diameter Charging applications | pCR | Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.0.0 | FS_FWDCA |
S5-110 AI: 7.5.2 |
approved | [WTS] [JSN] | |
S5-166234 | Implication on charging from eFMSS | discussion | China Telecommunications |
S5-110 AI: 7.3 |
noted | [WTS] [JSN] | |||
S5-166235 | Rel-14 pCR TR 32.870 Study 3GPP Diameter Charging Applications - Scope and References |
pCR revised to S5-166342 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.0.0 | FS_FWDCA |
S5-110 AI: 7.5.2 |
revised | [WTS] [JSN] | |
S5-166236 | Rel-14 pCR TR 32.870 Study 3GPP Diameter Charging Applications - Clause 3 | pCR | Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.0.0 | FS_FWDCA |
S5-110 AI: 7.5.2 |
approved | [WTS] [JSN] | |
S5-166237 | Rel-14 pCR TR 32.870 Study 3GPP Diameter Charging Applications - Clause 4.1 |
pCR revised to S5-166343 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.0.0 | FS_FWDCA |
S5-110 AI: 7.5.2 |
revised | [WTS] [JSN] | |
S5-166238 | Proposed Topics for Joint SA5/CT4/CT3 Discussion |
other revised to S5-166297 |
Nokia |
S5-110 AI: 8 |
revised | [WTS] [JSN] | |||
S5-166239 | Rel-14 CR 32.260 Not possible to record RAT change with the time in P-CSCF |
CR revised to S5-166302 |
Ericsson LM | 32.26 13.6.0 CR#372 catF | CH14 | Rel-13 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166240 | Rel-14 CR 32.299 Not possible to record RAT change with the time in P-CSCF |
CR revised to S5-166303 |
Ericsson LM | 32.299 14.1.0 CR#755 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166241 | Rel-14 draftCR TS32.251 General Description for Gy session optimization |
draftCR revised to S5-166288 |
Ericsson LM | CH14-ROPOCH | Rel-14 |
S5-110 AI: 7.4.1 |
revised | [WTS] [JSN] | |
S5-166242 | Rel-14 CR 32.260 AS serving the forwarding party |
CR revised to S5-166332 |
Ericsson LM | 32.26 13.6.0 CR#373 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166243 | Rel-14 CR 32.299 AS serving the forwarding party |
CR revised to S5-166333 |
Ericsson LM | 32.299 14.1.0 CR#756 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166244 | Rel-14 CR 32.260 Correction of Number portability Routing information |
CR revised to S5-166334 |
Ericsson LM | 32.26 13.6.0 CR#374 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166245 | Rel-14 CR 32.299 Correction of Number-Portability-Routing-Information |
CR revised to S5-166335 |
Ericsson LM | 32.299 14.1.0 CR#757 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166246 | Rel-14 CR 32.274 Correction SMS Delivery handling |
CR revised to S5-166340 |
Ericsson LM | 32.274 13.1.0 CR#33 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166247 | Rel-14 CR 32.298 Missing value in SM Message Type |
CR revised to S5-166341 |
Ericsson LM | 32.298 14.0.0 CR#616 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166248 | Rel-14 CR 32.299 Called-Party-Address and Requested-Party-Address usage unclear |
CR revised to S5-166336 |
Ericsson LM | 32.299 14.1.0 CR#758 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166249 | Rel-14 CR 32.299 Correction of Change-Time to include Access Transfer Time |
CR revised to S5-166337 |
Ericsson LM | 32.299 14.1.0 CR#759 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
revised | [WTS] [JSN] |
S5-166250 | Rel-14 TS32.251 Midsession pausing for session optimization | other | Ericsson LM | CH14-ROPOCH | Rel-14 |
S5-110 AI: 7.4.1 |
noted | [WTS] [JSN] | |
S5-166251 | Use of User-Equipment-Info for IMEI in 32.299 | other | Ericsson LM | CH14 | Rel-14 |
S5-110 AI: 7.3 |
noted | [WTS] [JSN] | |
S5-166252 | LS on seeking collaboration on draft Recommendation “Energy efficiency Metrics and measurement methodology for 5G solutions | LS in | ITU-T |
S5-110 AI: 6.5.1 |
postponed | [WTS] [JSN] | |||
S5-166253 | LS from IMT2020 to SA5 on Collaborative Design of 5G Architecture and the Platform | LS in | IMT2020 |
S5-110 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-166254 | Report from methodology coordination meeting with ITU-T SG2 | other | Ericsson LM |
S5-110 AI: 4.3 |
withdrawn | [WTS] [JSN] | |||
S5-166255 | Proposals from ITU-T SG2 | discussion | Ericsson |
S5-110 AI: 6.3 |
noted | [WTS] [JSN] | |||
S5-166256 | Discussion sequence proposal for agenda point 6.5.5 | discussion | Ericsson LM | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | ||
S5-166257 | LS from NGMN cc SA5 on First set of Architecture Principles from the NGMN P1 E2E Architecture Framework project | LS in | NGMN |
S5-110 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-166258 | Time Plan for OAM&P |
other revision of S5-166004 |
WG Vice Chair (Huawei) |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166259 | LS from SA3 cc SA5 on Reply LS on I-WLAN handling and specification withdrawal | LS in | S3-162017 |
S5-110 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-166260 | Reply to: LS from ETSI ISG NFV on NFV-based solutions for next generation mobile networks |
LS out LS is reply to S5-166051 LS To: ETSI ISG NFV revised to S5-166409 |
Huawei |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166261 | Discussion Sequence Proposal | other | ZTE |
S5-110 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-166262 | LS reply to ATIS on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” |
LS out LS To: ATIS NRSC revision of S5-166062 |
ORANGE, Huawei |
S5-110 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-166263 | Reply to: LS from ETSI NFV to SA5 on SOL WG work plan schedule |
LS out LS is reply to S5-166220 LS To: ETSI ISG NFV revised to S5-166411 |
Huawei |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166264 | CR 32.103 Alignment with latest SA5 specification list and various enhancements |
draftCR revision of S5-166101 revised to S5-166329 |
Huawei, Ericsson | OAM14 | Rel-13 |
S5-110 AI: 6.3 |
revised | [WTS] [JSN] | |
S5-166265 | Add information to description of Management reference model in TS 32.101 |
discussion revision of S5-166165 revised to S5-166330 |
Ericsson | OAM14 |
S5-110 AI: 6.3 |
revised | [WTS] [JSN] | ||
S5-166266 | Rel-14 CR 32.150 Update reference to model repertoire |
CR revision of S5-166193 |
Ericsson LM | 32.15 13.1.0 CR#261 catC | OAM14 | Rel-14 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166267 | Entities with multiple roles |
discussion revision of S5-166198 |
Ericsson |
S5-110 AI: 6.3 |
endorsed | [WTS] [JSN] | |||
S5-166268 | pCR for dCR 32157 Include Interface IRP template |
other revision of S5-166214 |
Ericsson LM |
S5-110 AI: 6.3 |
approved | [WTS] [JSN] | |||
S5-166269 | LS to ITU-T SG2 on methodology coordination questions |
LS out LS To: ITU-T SG2 |
Ericsson |
S5-110 AI: 6.3 |
approved | [WTS] [JSN] | |||
S5-166270 | pCR TS 28.500 techenical and editorial update on 28500-120 |
pCR revision of S5-166169 |
China Mobile Com. Corporation | 28.5 2.0.0 |
S5-110 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-166271 | pCR draft TS 28.510 move one requirement to business level |
pCR revision of S5-166139 |
ZTE Corporation | 28.51 1.1.0 |
S5-110 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-166272 | pCR draft TS 28.510 remove the editor's notes |
pCR revision of S5-166138 revised to S5-166384 |
ZTE Corporation | 28.51 1.1.0 |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-166273 | pCR TS 28.510 Adding requirement and use case for createMO with VNF instance identifier |
pCR revision of S5-166162 revised to S5-166413 |
Huawei Technologies | 28.51 1.1.0 | OAM14-MAMO_VNF-CM |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |
S5-166274 | pCR 28.525 Update of the use case on VNF Scaling |
pCR revision of S5-166202 |
Intel Corporation (UK) Ltd | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166275 | pCR TS 28.511 Adding procedure flow for createMO with VNF instance identifier |
pCR revision of S5-166163 revised to S5-166414 |
Huawei Technologies | 28.511 0.5.0 | OAM14-MAMO_VNF-CM |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |
S5-166276 | pCR TS 28.526 Procedure of querying VNF instance information through Os-Ma-nfvo |
pCR revision of S5-166177 revised to S5-166366 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166277 | pCR TS 28.526 Procedure of querying VNF instance information through Ve-Vnfm-em |
pCR revision of S5-166178 revised to S5-166367 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166278 | pCR TS 28.526 Procedures of modifying non-application VNF instance information and configuration through Os-Ma-nfvo |
pCR revision of S5-166179 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166279 | R14 CR TS 28.621 Adding the generic configuration requirement to support management of VNFs |
CR revision of S5-166143 |
ZTE Corporation, Intel | 28.621 13.0.0 CR#31 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-110 AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
S5-166280 | Invitation to Network and Service Management workshop | other | WG Chair |
S5-110 AI: 4.3 |
noted | [WTS] [JSN] | |||
S5-166281 | Invitation to Information Modelling workshop | other | WG Chair |
S5-110 AI: 4.3 |
noted | [WTS] [JSN] | |||
S5-166282 | pCR TS 28.516 Procedure of VNF Healing through Ve-Vnfm-em |
pCR revision of S5-166180 |
NTT DOCOMO | 28.516 1.1.0 |
S5-110 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-166283 | CR 32.103 Alignment with latest SA5 specification list and various enhancements | CR | Huawei, Ericsson | 32.103 13.0.0 CR#15 catC | OAM14 | Rel-14 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166284 | IMS Offline Charging Improvement – Use Cases | other | AT&T |
S5-110 AI: 7.3 |
noted | [WTS] [JSN] | |||
S5-166285 | New WID Charging for SMS via T4 |
WID new revision of S5-166221 revised to S5-166397 |
Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 |
S5-110 AI: 7.2 |
revised | [WTS] [JSN] | ||
S5-166286 | New WID Charging aspects for Diameter Base Protocol Specification Update |
WID new revision of S5-166222 |
Nokia, Alcatel-Lucent Shanghai Bell |
S5-110 AI: 7.2 |
agreed | [WTS] [JSN] | |||
S5-166287 | Revised WID on Charging Aspects of S8 Home Routing Architecture for VoLTE |
WID revised revision of S5-166232 |
China Mobile Com. Corporation | V8, V8-CT |
S5-110 AI: 7.2 |
agreed | [WTS] [JSN] | ||
S5-166288 | Rel-14 draftCR TS32.251 General Description for Gy session optimization |
draftCR revision of S5-166241 |
Ericsson LM | CH14-ROPOCH | Rel-14 |
S5-110 AI: 7.4.1 |
approved | [WTS] [JSN] | |
S5-166289 | Rel-14 CR 32.251 Introduction of Gy session optimization based on unused quota timer | CR | Ericsson LM | 32.251 14.0.1 CR#482 catB | CH14-ROPOCH | Rel-14 |
S5-110 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-166290 | New Work Item on Charging aspects for 3GPP PS Data off | WID new | Huawei Technologies |
S5-110 AI: 7.2 |
agreed | [WTS] [JSN] | |||
S5-166291 | Rel-14 CR 32.277 Correction on the ProSe offline Charging |
CR revision of S5-166226 |
Huawei Technologies | 32.277 14.0.1 CR#201 catB | CH14-ProSe | Rel-14 |
S5-110 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-166292 | Rel-14 CR 32.277 Addtion of the triggers for ProSe charging |
CR revision of S5-166228 |
Huawei Technologies | 32.277 14.0.1 CR#221 catB | CH14-ProSe | Rel-14 |
S5-110 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-166293 | Rel-14 CR 32.277 Addition of session based charging for ProSe one-to-one communication |
CR revision of S5-166227 |
Huawei Technologies | 32.277 14.0.1 CR#211 catB | CH14-ProSe | Rel-14 |
S5-110 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-166294 | Rel-14 CR 32.277 Addition of Message flow for ProSe Direct Discovery for Public Safety use |
CR revision of S5-166229 |
Huawei Tech.(UK) Co., Ltd | 32.277 14.0.1 CR#231 catB | CH14-ProSe | Rel-14 |
S5-110 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-166295 | Rel-14 CR 32.260 Add charging support for roaming architecture for voice over IMS with home routed traffic |
CR revision of S5-166167 |
China Mobile Com. Corporation | 32.26 13.6.0 CR#3701 catB | CH14-V8 | Rel-14 |
S5-110 AI: 7.4.4 |
agreed | [WTS] [JSN] |
S5-166296 | Rel-14 CR 32.260 Clarification on location of P-CSCF and CDF in message flows |
CR revision of S5-166223 |
China Mobile Com. Corporation | 32.26 13.6.0 CR#3711 catB | CH14-V8 | Rel-14 |
S5-110 AI: 7.4.4 |
agreed | [WTS] [JSN] |
S5-166297 | Joint SA5/CT4/CT3 Discussion |
other revision of S5-166238 |
SA5 SWG Chair |
S5-110 AI: 8 |
endorsed | [WTS] [JSN] | |||
S5-166298 | Joint SA5/CT4/CT3 Discussion – Supported Features | other | SA5 SWG Chair |
S5-110 AI: 8 |
endorsed | [WTS] [JSN] | |||
S5-166299 | LS reply to LS on Informing charging system about 3GPP PS Data off status |
LS out LS To: SA2 revision of S5-166219 |
Huawei Technologies |
S5-110 AI: 7.1 |
agreed | [WTS] [JSN] | |||
S5-166300 | Rel-14 CR 32.251 Addition of charging support for Mulitiple PRAs |
CR revision of S5-166224 |
Huawei Technologies | 32.251 14.0.1 CR#4801 catB | AULC-CH | Rel-14 |
S5-110 AI: 7.4.5 |
agreed | [WTS] [JSN] |
S5-166301 | Rel-14 CR 32.298 Addition of charging support for Mulitiple PRAs |
CR revision of S5-166225 |
Huawei Technologies | 32.298 14.0.0 CR#6151 catB | AULC-CH | Rel-14 |
S5-110 AI: 7.4.5 |
agreed | [WTS] [JSN] |
S5-166302 | Rel-14 CR 32.260 Correction on Access Network Info change with the time in offline |
CR revision of S5-166239 |
Ericsson LM | 32.26 13.6.0 CR#3721 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166303 | Rel-14 CR 32.299 Correction on Access Network Info change with the time in offline |
CR revision of S5-166240 |
Ericsson LM | 32.299 14.1.0 CR#7551 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166304 | Reply to: LS from RAN3 to SA5 on Flexible eNB-ID and Cell-ID in E-UTRAN |
LS out LS is reply to S5-166125 LS To: RAN3 revised to S5-166410 |
Ericsson |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166305 | Replacing the reference to LS with reference to TS 36.300 |
CR revision of S5-166204 |
Ericsson | 32.817 14.0.0 CR#11 catF | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
agreed | [WTS] [JSN] |
S5-166306 | pCR on 28525 text inclusion regarding LCM operations use parameter |
pCR revised to S5-166385 |
Ericsson | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166307 | Exemplary flows |
pCR revision of S5-166191 |
RED Technologies SAS | 28.302 0.1.0 | FS_OAM_LSA |
S5-110 AI: 6.4.3 |
noted | [WTS] [JSN] | |
S5-166308 | pCR 28.511 procedure of modify MO attributes | pCR | Intel Corporation (UK) Ltd | 28.511 0.5.0 |
S5-110 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-166309 | Scope update | pCR | RED Technologies SAS | 28.302 0.1.0 | OAM14-LSA |
S5-110 AI: 6.4.3 |
withdrawn | [WTS] [JSN] | |
S5-166310 | IOC definition |
pCR revision of S5-166192 revised to S5-166434 |
RED Technologies SAS | 28.302 0.1.0 | OAM14-LSA |
S5-110 AI: 6.4.3 |
revised | [WTS] [JSN] | |
S5-166311 | Cell parameters definition |
pCR revision of S5-166194 revised to S5-166435 |
RED Technologies SAS | 28.302 0.1.0 | OAM14-LSA |
S5-110 AI: 6.4.3 |
revised | [WTS] [JSN] | |
S5-166312 | pCR TS 28.520 revision of a requirement |
pCR revision of S5-166136 |
Intel Corporation (UK) Ltd | 28.52 1.1.0 |
S5-110 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-166313 | pCR to TR 28.525 Create NS Identifier |
pCR revision of S5-166105 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166314 | pCR to TR 28.525 Create a new version of already on-boarded PNFD |
pCR revision of S5-166106 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166315 | pCR to TR 28.525 Update the user defined data on PNFD |
pCR revision of S5-166107 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166316 | pCR to TR 28.525 Delete the PNFD |
pCR revision of S5-166108 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166317 | pCR to TR 28.525 Query the PNFD |
pCR revision of S5-166109 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166318 | pCR to TR 28.525 Subscribe to NSD changes notifications |
pCR revision of S5-166110 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166319 | pCR to TR 28.525 Notify on NSD Management changes operation |
pCR revision of S5-166111 |
Cisco Systems Inc. | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166320 | pCR to TS 28.526 add scope section |
pCR revision of S5-166129 |
Nokia Networks | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166321 | pCR to TS 28.527 add scope section |
pCR revision of S5-166131 |
Nokia Networks | 28.527 0.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166322 | pCR to TS 28.528 add scope section |
pCR revision of S5-166133 |
Nokia Networks | 28.528 0.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166323 | pCR TS 28.526 Procedure of VNF instantiation through Os-Ma-nfvo |
pCR revision of S5-166170 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166324 | pCR TS 28.526 Procedure of NS instantiation |
pCR revision of S5-166173 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166325 | pCR TS 28.526 Procedure of updating an NS instance to correspond to a different NSD version |
pCR revision of S5-166174 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166326 | pCR TS 28.526 Procedure of VNF scaling through Os-Ma-nfvo |
pCR revision of S5-166175 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166327 | OAM SWG action list |
other revision of S5-166035 revised to S5-166408 |
WG Vice Chair (Huawei) |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166328 | pCR TS 28.525 Addressing Note in use case clause 6.4.1.3.1 | pCR | NTT DOCOMO | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
withdrawn | [WTS] [JSN] | ||
S5-166329 | CR 32.103 Alignment with latest SA5 specification list and various enhancements |
draftCR revision of S5-166264 |
Huawei, Ericsson | OAM14 | Rel-13 |
S5-110 AI: 6.3 |
approved | [WTS] [JSN] | |
S5-166330 | Add information to description of Management reference model in TS 32.101 |
discussion revision of S5-166265 |
Ericsson | OAM14 |
S5-110 AI: 6.3 |
endorsed | [WTS] [JSN] | ||
S5-166331 | pCR 32.856 proposed text for clause 4.6 Assessment report |
pCR revision of S5-166072 |
ORANGE | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-166332 | Rel-14 CR 32.260 Correction on Role-Of-node for AS serving the forwarding |
CR revision of S5-166242 |
Ericsson LM | 32.26 13.6.0 CR#3731 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166333 | Rel-14 CR 32.299 Correction on Role-Of-node for AS serving the forwarding party |
CR revision of S5-166243 |
Ericsson LM | 32.299 14.1.0 CR#7561 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166334 | Rel-14 CR 32.260 Correction of Number portability Routing information |
CR revision of S5-166244 |
Ericsson LM | 32.26 13.6.0 CR#3741 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166335 | Rel-14 CR 32.299 Correction of Number-Portability-Routing-Information |
CR revision of S5-166245 |
Ericsson LM | 32.299 14.1.0 CR#7571 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166336 | Rel-14 CR 32.299 Correction of Called-Party-Address and Requested-Party-Address |
CR revision of S5-166248 |
Ericsson LM | 32.299 14.1.0 CR#7581 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166337 | Rel-14 CR 32.299 Correction of Change-Time to include Access Transfer Time |
CR revision of S5-166249 |
Ericsson LM | 32.299 14.1.0 CR#7591 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166338 | Rel-13 CR 32.298 Correction on ASN.1 in PS domain CDRs |
CR revision of S5-166096 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.5.0 CR#6131 catF | CH13 | Rel-13 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166339 | Rel-14 CR 32.298 Correction on ASN.1 in PS domain CDRs |
CR revision of S5-166097 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 14.0.0 CR#6141 catF | CH13 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166340 | Rel-14 CR 32.274 Correction SMS Delivery handling |
CR revision of S5-166246 |
Ericsson LM | 32.274 13.1.0 CR#331 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166341 | Rel-14 CR 32.298 Correction of value in SM Message Type |
CR revision of S5-166247 |
Ericsson LM | 32.298 14.0.0 CR#6161 catF | CH14 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166342 | Rel-14 pCR TR 32.870 Study 3GPP Diameter Charging Applications - Scope and References |
pCR revision of S5-166235 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.1.0 | FS_FWDCA |
S5-110 AI: 7.5.2 |
agreed | [WTS] [JSN] | |
S5-166343 | Rel-14 pCR TR 32.870 Study 3GPP Diameter Charging Applications - Clause 4.1 |
pCR revision of S5-166237 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.1.0 | FS_FWDCA |
S5-110 AI: 7.5.2 |
approved | [WTS] [JSN] | |
S5-166344 | Rel-9 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revision of S5-166084 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 9.22.0 CR#7471 catF | CH9 | Rel-9 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166345 | Rel-10 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revision of S5-166085 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 10.18.0 CR#7481 catA | CH9 | Rel-10 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166346 | Rel-11 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revision of S5-166086 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 11.18.0 CR#7491 catA | CH9 | Rel-11 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166347 | pCR 32.856 Proposed text for clause 4.7 Conclusion |
pCR revision of S5-166102 |
ORANGE | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-166348 | pCR 32.856 Proposed text for clause 5.2 Analysis of control-monitoring information |
pCR revision of S5-166114 |
ORANGE, Huawei | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-166349 | pCR 32.856 Proposed text for clause 5.3 Potential use cases |
pCR revision of S5-166115 |
ORANGE, Deutsche Telekom, Huawei, Vodafone,Ericsson | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-166350 | pCR 32.856 Proposed text for clause 5.4 Potential requirements |
pCR revision of S5-166116 |
ORANGE | 32.856 1.0.0 |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-166351 | LS on ES 202 336-12 – Comments on Figure 1 and clarification needed on potential use case |
LS out LS To: ETSI EE 02 revision of S5-166117 revised to S5-166477 |
ORANGE |
S5-110 AI: 6.5.1 |
revised | [WTS] [JSN] | |||
S5-166352 | pCR to TR 32.865 Cell splitting correction | pCR | Cisco Systems Inc. | 32.865 1.0.0 |
S5-110 AI: 6.5.2 |
withdrawn | [WTS] [JSN] | ||
S5-166353 | pCR to TR 32.865 Management of SP-Cells |
pCR revision of S5-166119 |
Cisco Systems Inc. | 32.865 1.0.0 |
S5-110 AI: 6.5.2 |
approved | [WTS] [JSN] | ||
S5-166354 | pCR for TR 32.865 Update description of potential architecture options |
pCR revision of S5-166183 |
Nokia Networks Oy | 32.865 1.0.0 | FS_OAM_SON_AAS |
S5-110 AI: 6.5.2 |
approved | [WTS] [JSN] | |
S5-166355 | pCR TR 28.800 Add terminologies for management and orchestration of network function and resource |
pCR revision of S5-166147 revised to S5-166437 |
Huawei Technologies | 28.8 0.3.0 | FS_NGNS_MOA |
S5-110 AI: 6.5.4 |
revised | [WTS] [JSN] | |
S5-166356 | pCR TR 28.800 Add use case for management support of UDM | pCR | Huawei Technologies | 28.8 0.3.0 | FS_NGNS_MOA |
S5-110 AI: 6.5.4 |
withdrawn | [WTS] [JSN] | |
S5-166357 | pCR 28.801 add Introduction chapter 6 |
pCR revision of S5-166195 revised to S5-166451 |
Ericsson LM | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166358 | pCR TR 28.801 Terminology update |
pCR revision of S5-166197 revised to S5-166453 |
Ericsson LM,Huawei | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166359 | pCR TR 28.801 Update on the Network slice instance lifecycle |
pCR revision of S5-166161 revised to S5-166450 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166360 | pCR 28.801 Use case and Requirement Monitor performance of a network slice instance |
pCR revision of S5-166208 |
Ericsson LM, Huawei | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166361 | Rel-14 Draft CR 32.156 Add missing Annex | draftCR | Ericsson | Rel-13 |
S5-110 AI: 6.3 |
approved | [WTS] [JSN] | ||
S5-166362 | Rel-14 Draft CR 32.157 Include Interface IRP template | draftCR | Ericsson | Rel-13 |
S5-110 AI: 6.3 |
approved | [WTS] [JSN] | ||
S5-166363 | Rel-14 CR 32.156 Add missing Annex | CR | Ericsson | 32.156 13.0.0 CR#3 catB | OAM14 | Rel-14 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166364 | Rel-14 CR 32.157 Include Interface IRP template | CR | Ericsson | 32.157 13.0.0 CR#5 catB | OAM14 | Rel-14 |
S5-110 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-166365 | pCR 28.801 Use case and Requirement Supervise network slice instance |
pCR revision of S5-166209 |
Ericsson LM,Huawei | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166366 | pCR TS 28.526 Procedure of querying VNF instance information through Os-Ma-nfvo |
pCR revision of S5-166276 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166367 | pCR TS 28.526 Procedure of querying VNF instance information through Ve-Vnfm-em |
pCR revision of S5-166277 |
NTT DOCOMO | 28.526 0.3.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166368 | pCR 28.801 Use case and Requirement Uplift network slice instance | pCR | Ericsson LM | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
withdrawn | [WTS] [JSN] | |
S5-166369 | pCR 28.801 Use case and Requirements for Prepare introduction of new feature in a network slice instance | pCR | Ericsson LM | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
withdrawn | [WTS] [JSN] | |
S5-166370 | pCR TR 28.801 Add requirements and use case for informing network slice instance change | pCR | Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
withdrawn | [WTS] [JSN] | |
S5-166371 | pCR TR 28.801 Add requirements and update use case for creating a network slice instance |
pCR revision of S5-166154 revised to S5-166445 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166372 | pCR 28.302 – Add System Context for interface between LC and NM |
pCR revision of S5-166216 |
Nokia Networks | 28.302 0.1.0 |
S5-110 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-166373 | pCR TR 28.801 Add requirements and update use case for modifying a network slice instance |
pCR revision of S5-166155 revised to S5-166412 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166374 | pCR TR 28.801 Add requirements and update use case for terminating a network slice instance |
pCR revision of S5-166156 revised to S5-166447 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166375 | pCR TR 28.801 Add use case for service request for a slice instance |
pCR revision of S5-166148 revised to S5-166432 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166376 | pCR TR 28.801 Add network slice sharing use case |
pCR revision of S5-166149 revised to S5-166443 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166377 | pCR TR 28.801 Adding use case and requirements for E2E network slice supporting end user services |
pCR revision of S5-166150 revised to S5-166444 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166378 | pCR TR 28.801 Add use case for policy configuration |
pCR revision of S5-166152 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166379 | pCR TR 28.801 Add general requirements for network slice lifecycle management |
pCR revision of S5-166157 revised to S5-166448 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166380 | pCR TR 28.801 Add general requirements for network slice subnet lifecycle management | pCR | Ericsson LM | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
withdrawn | [WTS] [JSN] | |
S5-166381 | pCR TR 28.801 Network slice type impact on network management system | pCR | Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
withdrawn | [WTS] [JSN] | |
S5-166382 | pCR TR 28.801 Possible network slice creation methods without shared NFs |
pCR revision of S5-166160 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166383 | pCR TR 28.801 Possible network slice creation methods with shared NFs |
pCR revision of S5-166159 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-166384 | pCR draft TS 28.510 remove the editor's notes |
pCR revision of S5-166272 |
ZTE Corporation | 28.51 1.1.0 |
S5-110 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-166385 | pCR on 28525 text inclusion regarding LCM operations use parameter |
pCR revision of S5-166306 revised to S5-166431 |
Ericsson | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-166387 | pCR TR 28.802 Add use case for supporting cric management case | pCR | Huawei Technologies | 28.802 0.2.0 |
S5-110 AI: 6.5.6 |
withdrawn | [WTS] [JSN] | ||
S5-166388 | Rel-12 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revision of S5-166087 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 12.11.0 CR#7501 catA | CH9 | Rel-12 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166389 | Rel-13 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revision of S5-166088 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.6.0 CR#7511 catA | CH9 | Rel-13 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166390 | Rel-14 CR 32.299 Correction on Requested Party Address for Emergency IMS session |
CR revision of S5-166089 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.1.0 CR#7521 catA | CH9 | Rel-14 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166391 | Rel-10 CR 32.298 Correction on OMR attributes per media in IMS Charging |
CR revision of S5-166074 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 10.19.0 CR#6021 catF | OMR | Rel-10 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166392 | Rel-11 CR 32.298 Correction on OMR attributes per media in IMS Charging |
CR revision of S5-166075 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 11.16.0 CR#6031 catA | OMR | Rel-11 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166393 | Rel-12 CR 32.298 Correction on OMR attributes per media in IMS Charging |
CR revision of S5-166076 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 12.11.0 CR#6041 catA | OMR | Rel-12 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166394 | Rel-13 CR 32.298 Correction on OMR attributes per media in IMS Charging |
CR revision of S5-166077 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.5.0 CR#6051 catA | OMR | Rel-13 |
S5-110 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-166395 | Latest draft TR 32.870 “study on forward compatibility Diameter Charging applications” | draft TR | Nokia | Rel-14 |
S5-110 AI: 7.5.2 |
approved | [WTS] [JSN] | ||
S5-166396 | LS to SA5 on reply to 3GPP SA5 on use of un-instantiated VNF instance ID in UpdateNS operation | LS in | ETSI ISG NFV |
S5-110 AI: 5.3 |
postponed | [WTS] [JSN] | |||
S5-166397 | New WID Charging for SMS via T4 |
WID new revision of S5-166285 |
Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 |
S5-110 AI: 7.2 |
agreed | [WTS] [JSN] | ||
S5-166398 | pCR for TR 28.802 Add use cases to support management for New RAN architecture |
pCR revision of S5-166188 revised to S5-166456 |
Nokia Networks Oy | 28.802 0.2.0 | FS_MAN_NGNAF |
S5-110 AI: 6.5.6 |
revised | [WTS] [JSN] | |
S5-166399 | Discussion paper - enhancement of NRM to support the VNF |
discussion revision of S5-166142 |
ZTE Corporation, Intel |
S5-110 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-166400 | Rel-13 CR 32.130 Add use cases and requirements for Management of measurements for cross-operator accounting based on data volume and QoS |
CR revision of S5-166060 revised to S5-166440 |
Ericsson | 32.13 13.0.0 CR#11 catB | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-166401 | Rel-14 CR 32.425 Add measurements for cross-operator accounting based on data volume and QoS |
CR revision of S5-166061 |
Ericsson | 32.425 14.0.0 CR#1631 catB | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
agreed | [WTS] [JSN] |
S5-166402 | Rel-13 CR 32.412 Add parameters for operation “Create measurement job” related to measurement filtering and measurement job reliability level |
CR revision of S5-166066 |
Ericsson | 32.412 13.0.0 CR#351 catB | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
agreed | [WTS] [JSN] |
S5-166403 | End user service PM information via the UE |
pCR revision of S5-166201 revised to S5-166457 |
Ericsson | 28.802 0.2.0 |
S5-110 AI: 6.5.6 |
revised | [WTS] [JSN] | ||
S5-166404 | pCR to TR 32.857 Scope section |
pCR revision of S5-166113 |
Cisco Systems Inc. | 32.857 0.1.0 |
S5-110 AI: 6.5.7 |
approved | [WTS] [JSN] | ||
S5-166405 | Draft TR 32.864 Skeleton proposal |
draft TR revision of S5-166134 |
Intel Corporation (UK) Ltd | Rel-14 |
S5-110 AI: 6.5.9 |
approved | [WTS] [JSN] | ||
S5-166406 | pCR TR 32.864 adding introduction and scope |
pCR revision of S5-166135 revised to S5-166460 |
Intel Corporation (UK) Ltd | 32.864 0.1.0 |
S5-110 AI: 6.5.9 |
revised | [WTS] [JSN] | ||
S5-166407 | Presentation of draft TR 32.856 to SA for Information | TS or TR cover | ORANGE |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | |||
S5-166408 | OAM SWG action list |
other revision of S5-166327 |
WG Vice Chair (Huawei) |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166409 | Reply to: LS from ETSI ISG NFV on NFV-based solutions for next generation mobile networks |
LS out LS is reply to S5-166051 LS To: ETSI ISG NFV revision of S5-166260 revised to S5-166464 |
Huawei |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166410 | Reply to: LS from RAN3 to SA5 on Flexible eNB-ID and Cell-ID in E-UTRAN |
LS out LS is reply to S5-166125 LS To: RAN3 LS reply in R3-170850 revision of S5-166304 |
Ericsson |
S5-110 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-166411 | Reply to: LS from ETSI NFV to SA5 on SOL WG work plan schedule |
LS out LS is reply to S5-166220 LS To: ETSI ISG NFV revision of S5-166263 revised to S5-166465 |
Huawei |
S5-110 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-166412 | pCR TR 28.801 Add requirements and update use case for modifying a network slice instance |
pCR revision of S5-166373 revised to S5-166446 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166413 | pCR TS 28.510 Adding requirement and use case for createMO with VNF instance identifier |
pCR revision of S5-166273 |
Huawei Technologies | 28.51 1.1.0 | OAM14-MAMO_VNF-CM |
S5-110 AI: 6.4.1.2 |
approved | [WTS] [JSN] | |
S5-166414 | pCR TS 28.511 Adding procedure flow for createMO with VNF instance identifier |
pCR revision of S5-166275 |
Huawei Technologies | 28.511 0.5.0 | OAM14-MAMO_VNF-CM |
S5-110 AI: 6.4.1.2 |
approved | [WTS] [JSN] | |
S5-166415 | revised WID LCM | WID revised | Nokia | OAM14-MAMO_VNF-LCM |
S5-110 AI: 6.4.1.5 |
agreed | [WTS] [JSN] | ||
S5-166416 | Revised WID CM |
WID revised revised to S5-166466 |
ZTE | OAM14-MAMO_VNF-CM |
S5-110 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-166417 | Draft TR 28.510 | draft TR | ZTE | Rel-14 |
S5-110 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-166418 | Draft TS 28.500 | draft TS | China Mobile | Rel-14 |
S5-110 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-166419 | Rel-14 CR 32.101 Introduction of VNFs in mobile networks | CR | China Mobile | 32.101 13.0.0 CR#62 catB | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-110 AI: 6.4.1.1 |
agreed | [WTS] [JSN] |
S5-166420 | Revised WID FM | WID revised | Huawei | OAM14-MAMO_VNF-FM |
S5-110 AI: 6.4.1.3 |
agreed | [WTS] [JSN] | ||
S5-166421 | Draft TS 28.515 | draft TS | Huawei | Rel-14 |
S5-110 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-166422 | Draft TS 28.516 | draft TS | Huawei | Rel-14 |
S5-110 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-166423 | Draft TS 28.517 | draft TS | Huawei | Rel-14 |
S5-110 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-166424 | Reply to: Resubmitted LS from ETSI NFV to SA5 on NFV Interface and Architecture specifications |
LS out LS is reply to S5-166042 LS To: ETSI ISG NFV |
Huawei |
S5-110 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-166425 | Revised WID PM |
WID revised revised to S5-166467 |
Intel | OAM14-MAMO_VNF-PM |
S5-110 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-166426 | Draft TS 28.520 | draft TS | Intel | Rel-14 |
S5-110 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-166427 | Draft TS 28.525 | draft TS | Nokia | Rel-14 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166428 | Draft TS 28.526 | draft TS | Nokia | Rel-14 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166429 | Draft TS 28.527 | draft TS | Nokia | Rel-14 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166430 | Draft TS 28.528 | draft TS | Nokia | Rel-14 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166431 | pCR on 28525 text inclusion regarding LCM operations use parameter |
pCR revision of S5-166385 |
Ericsson | 28.525 1.1.0 |
S5-110 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-166432 | pCR TR 28.801 Add use case for service request for a slice instance |
pCR revision of S5-166375 revised to S5-166442 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166433 | Revised WID filtering PM | WID revised | Ericsson | OAM14-MAMO_VNF-PM |
S5-110 AI: 6.4.2 |
withdrawn | [WTS] [JSN] | ||
S5-166434 | IOC definition |
pCR revision of S5-166310 |
RED Technologies SAS | 28.302 0.1.0 | OAM14-LSA |
S5-110 AI: 6.4.3 |
approved | [WTS] [JSN] | |
S5-166435 | Cell parameters definition |
pCR revision of S5-166311 |
RED Technologies SAS | 28.302 0.1.0 | OAM14-LSA |
S5-110 AI: 6.4.3 |
approved | [WTS] [JSN] | |
S5-166436 | Draft TR 32.856 | draft TR | ORANGE | Rel-14 |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-166437 | pCR TR 28.800 Add terminologies for management and orchestration of network function and resource |
pCR revision of S5-166355 revised to S5-166441 |
Huawei Technologies | 28.8 0.3.0 | FS_NGNS_MOA |
S5-110 AI: 6.5.4 |
revised | [WTS] [JSN] | |
S5-166438 | Draft TR 32.865 | draft TR | Nokia | Rel-14 |
S5-110 AI: 6.5.2 |
approved | [WTS] [JSN] | ||
S5-166439 | Draft TR 32.880 | draft TR | China Mobile | Rel-14 |
S5-110 AI: 6.5.3 |
approved | [WTS] [JSN] | ||
S5-166440 | Rel-13 CR 32.130 Add use cases and requirements for Management of measurements for cross-operator accounting based on data volume and QoS |
CR revision of S5-166400 |
Ericsson | 32.13 13.0.0 CR#12 catB | OAM14-FILMEAS | Rel-14 |
S5-110 AI: 6.4.2 |
agreed | [WTS] [JSN] |
S5-166441 | pCR TR 28.800 Add terminologies for management and orchestration of network function and resource |
pCR revision of S5-166437 |
Huawei Technologies | 28.8 0.3.0 | FS_NGNS_MOA |
S5-110 AI: 6.5.4 |
approved | [WTS] [JSN] | |
S5-166442 | pCR TR 28.801 Add use case for service request for a slice instance |
pCR revision of S5-166432 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166443 | pCR TR 28.801 Add network slice sharing use case |
pCR revision of S5-166376 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166444 | pCR TR 28.801 Adding use case and requirements for E2E network slice supporting end user services |
pCR revision of S5-166377 |
Huawei Technologies | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166445 | pCR TR 28.801 Add requirements and update use case for creating a network slice instance |
pCR revision of S5-166371 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166446 | pCR TR 28.801 Add requirements and update use case for modifying a network slice instance |
pCR revision of S5-166412 revised to S5-166468 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166447 | pCR TR 28.801 Add requirements and update use case for terminating a network slice instance |
pCR revision of S5-166374 revised to S5-166469 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166448 | pCR TR 28.801 Add general requirements for network slice lifecycle management |
pCR revision of S5-166379 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166449 | LS to SA2 on clarification of clarification of network slice template |
LS out LS To: SA2 revised to S5-166479 |
Ericsson |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |||
S5-166450 | pCR TR 28.801 Update on the Network slice instance lifecycle |
pCR revision of S5-166359 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166451 | pCR 28.801 add Introduction chapter 6 |
pCR revision of S5-166357 |
Ericsson LM | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166452 | Launch of TS quality campaign | other | WG Chair |
S5-110 AI: 5.1 |
withdrawn | [WTS] [JSN] | |||
S5-166453 | pCR TR 28.801 Terminology update |
pCR revision of S5-166358 revised to S5-166470 |
Ericsson LM,Huawei | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-166454 | Draft TR 28.302 | draft TR | Nokia | Rel-14 |
S5-110 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-166455 | Draft TR 28.801 | draft TR | Ericsson | Rel-14 |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | ||
S5-166456 | pCR for TR 28.802 Add use cases to support management for New RAN architecture |
pCR revision of S5-166398 |
Nokia Networks Oy | 28.802 0.2.0 | FS_MAN_NGNAF |
S5-110 AI: 6.5.6 |
noted | [WTS] [JSN] | |
S5-166457 | End user service PM information via the UE |
pCR revision of S5-166403 |
Ericsson | 28.802 0.2.0 |
S5-110 AI: 6.5.6 |
approved | [WTS] [JSN] | ||
S5-166458 | Draft TR 28.802 | draft TR | Nokia | Rel-14 |
S5-110 AI: 6.5.6 |
approved | [WTS] [JSN] | ||
S5-166459 | Draft TR 32.857 | draft TR | Cisco | Rel-14 |
S5-110 AI: 6.5.7 |
approved | [WTS] [JSN] | ||
S5-166460 | pCR TR 32.864 adding introduction and scope |
pCR revision of S5-166406 |
Intel Corporation (UK) Ltd | 32.864 0.1.0 |
S5-110 AI: 6.5.9 |
approved | [WTS] [JSN] | ||
S5-166461 | Draft TR 32.864 | draft TR | Intel | Rel-14 |
S5-110 AI: 6.5.9 |
approved | [WTS] [JSN] | ||
S5-166462 | WID on Management Enhancement of CUPS |
WID new revised to S5-166471 |
Huawei |
S5-110 AI: 6.2 |
revised | [WTS] [JSN] | |||
S5-166463 | Reply to: LS from SA4 to SA5 on QoE reporting for streaming services |
LS out LS is reply to S5-166049 LS To: SA4 |
Ericsson |
S5-110 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-166464 | Reply to: LS from ETSI ISG NFV on NFV-based solutions for next generation mobile networks |
LS out LS is reply to S5-166051 LS To: ETSI ISG NFV revision of S5-166409 |
Huawei |
S5-110 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-166465 | Reply to: LS from ETSI NFV to SA5 on SOL WG work plan schedule |
LS out LS is reply to S5-166220 LS To: ETSI ISG NFV revision of S5-166411 |
Huawei |
S5-110 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-166466 | Revised WID CM |
WID revised revision of S5-166416 |
ZTE | OAM14-MAMO_VNF-CM |
S5-110 AI: 6.4.1.2 |
agreed | [WTS] [JSN] | ||
S5-166467 | Revised WID PM |
WID revised revision of S5-166425 |
Intel | OAM14-MAMO_VNF-PM |
S5-110 AI: 6.4.1.4 |
agreed | [WTS] [JSN] | ||
S5-166468 | pCR TR 28.801 Add requirements and update use case for modifying a network slice instance |
pCR revision of S5-166446 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166469 | pCR TR 28.801 Add requirements and update use case for terminating a network slice instance |
pCR revision of S5-166447 |
Huawei Technologies, Ericsson | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166470 | pCR TR 28.801 Terminology update |
pCR revision of S5-166453 |
Ericsson LM,Huawei | 28.801 0.2.0 | FS_MONETS |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-166471 | WID on Management Enhancement of CUPS |
WID new revision of S5-166462 revised to S5-166475 |
Huawei |
S5-110 AI: 6.2 |
revised | [WTS] [JSN] | |||
S5-166472 | Draft TR 28.800 | draft TR | Huawei | Rel-14 |
S5-110 AI: 6.5.4 |
approved | [WTS] [JSN] | ||
S5-166473 | Draft TR 28.511 | draft TR | ZTE | Rel-14 |
S5-110 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-166474 | LS to SA5 on the progress of QoE Measurement Collection for Streaming to RAN3, SA4, SA5 and CT1 | LS in | R2-168917 |
S5-110 AI: 5.3 |
postponed | [WTS] [JSN] | |||
S5-166475 | WID on Management Enhancement of CUPS |
WID new revision of S5-166471 |
Huawei |
S5-110 AI: 6.2 |
agreed | [WTS] [JSN] | |||
S5-166476 | OAM Executive Report from THIS Meeting |
report revision of S5-166005 |
WG Vice Chair (Huawei) |
S5-110 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-166477 | LS on ES 202 336-12 – Comments on Figure 1 and clarification needed on potential use case |
LS out LS To: ETSI EE 02 revision of S5-166351 |
ORANGE |
S5-110 AI: 6.5.1 |
approved | [WTS] [JSN] | |||
S5-166478 | Revised WID OAM aspects of SON for AAS |
WID revised revised to S5-166480 |
Nokia | FS_OAM_SON_AAS |
S5-110 AI: 6.5.2 |
revised | [WTS] [JSN] | ||
S5-166479 | LS on the clarification of the definition of NSI and the relation to NST |
LS out LS To: SA2 revision of S5-166449 |
Ericsson |
S5-110 AI: 6.5.5 |
approved | [WTS] [JSN] | |||
S5-166480 | Revised WID OAM aspects of SON for AAS |
WID revised revision of S5-166478 |
Nokia | FS_OAM_SON_AAS |
S5-110 AI: 6.5.2 |
agreed | [WTS] [JSN] |
480 documents (1.0731630325317 seconds)