Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-165000 | Agenda | agenda | WG Chairman |
S5-109 AI: 2 |
approved | [WTS] [JSN] | |||
S5-165001 | Report from last SA5 meeting | report | ETSI Secretariat |
S5-109 AI: 4.1 |
approved | [WTS] [JSN] | |||
S5-165002 | SA5 status report at last SA meeting | report | WG Chairman |
S5-109 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-165003 | SA5 results at last SA meeting | report | WG Chairman |
S5-109 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-165004 | Time Plan for OAM&P | other | WG Vice Chair (Huawei) |
S5-109 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-165005 | OAM Executive Report from THIS Meeting |
report revised to S5-165374 |
WG Vice Chair (Huawei) |
S5-109 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-165006 | Leaders meeting agenda | agenda | WG Chairman |
S5-109 AI: 5.1 |
withdrawn | [WTS] [JSN] | |||
S5-165007 | Leaders meeting minutes | report | WG Chairman |
S5-109 AI: 5.1 |
withdrawn | [WTS] [JSN] | |||
S5-165008 | CH Agenda and Time Plan | agenda | CH SWG Chair |
S5-109 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-165009 | CH Executive Report from THIS Meeting | report | CH SWG Chair |
S5-109 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-165010 | SA5 Meeting Calendar |
other revised to S5-165243 |
WG Vice Chair (Huawei) |
S5-109 AI: 5.4 |
revised | [WTS] [JSN] | |||
S5-165011 | SA5 Working Procedures | other | WG Vice Chair (Huawei) |
S5-109 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-165012 | SA5 Meeting Facility Requirements | other | WG Vice Chair (Orange) |
S5-109 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-165013 | Process for management of draft TSs/TRs |
other revised to S5-165242 |
WG Chairman |
S5-109 AI: 5.1 |
revised | [WTS] [JSN] | |||
S5-165014 | CR Quality Check | other | ETSI Secretariat |
S5-109 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-165015 | Deliverables due for the NEXT SA Plenary | other | ETSI Secretariat |
S5-109 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-165016 | Ongoing SA5 WIDs and SIDs | other | WG Vice Chair (Huawei) |
S5-109 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-165017 | SA5 3GPP Work Plan | other | ETSI Secretariat |
S5-109 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-165018 | Minutes of New Work Item proposals - OAM&P | report | WG Vice Chair (Orange) |
S5-109 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-165019 | Minutes of OAM&P Maintenance and Rel-14 small Enhancements | report | MCC |
S5-109 AI: 6.3 |
withdrawn | [WTS] [JSN] | |||
S5-165020 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | report | Rapporteur (Huawei) |
S5-109 AI: 6.5.4 |
noted | [WTS] [JSN] | |||
S5-165021 | Minutes for Study on Implementation for the Partitioning of Itf-N | report | Rapporteur(China Mobile) |
S5-109 AI: 6.5.3 |
noted | [WTS] [JSN] | |||
S5-165022 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions | report | Rapporteur(China Mobile) |
S5-109 AI: 6.4.1.1 |
noted | [WTS] [JSN] | |||
S5-165023 | Minutes for Configuration Management for mobile networks that include virtualized network functions | report | Rapporteur(ZTE) |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-165024 | Minutes for Fault Management for mobile networks that include virtualized network functions | report | Rapporteur(Huawei) |
S5-109 AI: 6.4.1.3 |
noted | [WTS] [JSN] | |||
S5-165025 | Minutes for Performance management for mobile networks that include virtualized network functions | report | Rapporteur(Intel) |
S5-109 AI: 6.4.1.4 |
noted | [WTS] [JSN] | |||
S5-165026 | Minutes for Lifecycle management for mobile networks that include virtualized network functions | report | Rapporteur (Nokia Networks) |
S5-109 AI: 6.4.1.5 |
noted | [WTS] [JSN] | |||
S5-165027 | Minutes for Filtering of PM measurements and data volume measurements for shared networks | report | Rapporteur(Ericsson) |
S5-109 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
S5-165028 | Minutes of Study on OAM support for assessment of energy efficiency in mobile access networks | report | Rapporteur (Orange) |
S5-109 AI: 6.5.1 |
noted | [WTS] [JSN] | |||
S5-165029 | Minutes for Study on OAM aspects of SON for AAS-based deployments | report | Rapporteur (Nokia Networks) |
S5-109 AI: 6.5.2 |
noted | [WTS] [JSN] | |||
S5-165030 | Minutes for Study on Management and Orchestration of Network Slicing | report | Rapporteur (Ericsson) |
S5-109 AI: 6.5.5 |
noted | [WTS] [JSN] | |||
S5-165031 | Minutes for Study on management aspects of next generation network architecture and features | report | Rapporteur(Nokia) |
S5-109 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-165032 | IPR and legal declaration | other | WG Chairman |
S5-109 AI: 3 |
noted | [WTS] [JSN] | |||
S5-165033 | Status of email approvals | other | WG Vice Chair (Orange) |
S5-109 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-165034 | Minutes of OAM support for Licensed Shared Access (LSA) | report | Rapporteur (Nokia) |
S5-109 AI: 6.4.3 |
noted | [WTS] [JSN] | |||
S5-165035 | OAM&P SWG action list |
other revised to S5-165215 |
WG Vice Chair (Huawei) |
S5-109 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-165036 | Work Plan status | other | WG Chair |
S5-109 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-165037 | Minutes of OAM&P SWG opening session | report | WG Vice Chair (Huawei) |
S5-109 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-165038 | SA5 work plan structure | discussion | SA vice chairman |
S5-109 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-165039 | Resubmitted LS from ATIS NRSC to SA5 on RE: Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network |
LS in LS reply in S5-165196, S5-165196, S5-165319 |
ATIS |
S5-109 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-165040 | Reply LS from CT3 to SA5 on PDP type extension to non-IP PDN type | LS in | C3-162183 |
S5-109 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-165041 | Resubmitted LS reply from CT4 to SA5 on progress of the work on Diameter Base Protocol Update |
LS in LS reply in S5-165223, S5-165223 |
C4-163282 |
S5-109 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-165042 | Reply LS from CT4 to SA5 on Control Plane CIoT EPS Optimisation Indicator propagated to PGW for charging purpose |
LS in LS reply in S5-165280 |
C4-164288 |
S5-109 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-165043 | Resubmitted Liaison reply from ETSI TC EE to 3GPP SA5 about standard ES 202 336-12 (ICT equipment power, energy and environmental parameters monitoring information model) |
LS in LS reply in S5-165129, S5-165129 |
ETSI TC EE |
S5-109 AI: 6.5.1 |
replied to | [WTS] [JSN] | |||
S5-165044 | Resubmitted Liaison from ETSI TC EE to 3GPP SA5 in response to S5-162239 |
LS in LS reply in S5-165128, S5-165128 |
ETSI TC EE |
S5-109 AI: 6.5.1 |
replied to | [WTS] [JSN] | |||
S5-165045 | Reply LS from SA2 to SA5 for enhancements required for charging of PDN connection to SCEF | LS in | S2-163767 |
S5-109 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-165046 | Response LS from SA2 to SA5 “LS on Control Plane CIoT EPS Optimisation Indicator propagated to PGW for charging purpose” |
LS in LS To: S5-165280 LS reply in S5-165280 |
S2-163768 |
S5-109 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-165047 | Reply LS from SA2 to ETSI NTECH AFI cc SA5 on Autonomic Networking | LS in | S2-164274 |
S5-109 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-165048 | LS from SA2 to SA5-CH on implication on charging from eFMSS | LS in | S2-164279 |
S5-109 AI: 7.1 |
postponed | [WTS] [JSN] | |||
S5-165049 | Editorial and minor technical changes to TS 28.525 based on EditHelp review | pCR | Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
noted | [WTS] [JSN] | |
S5-165050 | Potential ad hoc meeting on NFV work items | discussion | SA5 vice chairman | Rel-14 |
S5-109 AI: 6.1 |
noted | [WTS] [JSN] | ||
S5-165051 | Network Slice Use Case Methodology | discussion | Cisco Systems Belgium |
S5-109 AI: 6.5.5 |
noted | [WTS] [JSN] | |||
S5-165052 | Rel-13 CR 32.298 Correction on ASN.1 syntax for IMS, SMS and MONTE CDRs | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#596 catF | CH13 | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165053 | Rel-13 CR 32.251 Correction on Non-IP PDP type - alignement with TS 29.061 |
CR revised to S5-165233 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.251 13.5.0 CR#475 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165054 | Rel-13 CR 32.298 Correction on Non-IP PDP type -alignement with TS 29.061 |
CR revised to S5-165234 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#597 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165055 | Rel-13 CR 32.298 Correction on CPDT CDRs ASN.1 description | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#598 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165056 | Rel-13 CR 32.251 Correction on RAT Type for charging SMS in MME |
CR revised to S5-165235 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.251 13.5.0 CR#476 catF | SIMTC-CH | Rel-13 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165057 | pCR TS 28.520 include comments received from edithelp | pCR | Intel Corporation (UK) Ltd | 28.52 0.6.1 |
S5-109 AI: 6.4.1.4 |
noted | [WTS] [JSN] | ||
S5-165058 | Draft TS 28523 skeleton | draft TS | Intel Corporation (UK) Ltd | Rel-14 |
S5-109 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-165059 | pCR TS 28.523 add introduction and scope |
pCR revised to S5-165272 |
Intel Corporation (UK) Ltd | 28.523 0.0.0 |
S5-109 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-165060 | pCR TS 28.522 add stage 2 solutions |
pCR revised to S5-165274 |
Intel Corporation (UK) Ltd | 28.522 0.1.0 |
S5-109 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-165061 | pCR TS 28.520 add reference to ETSI GS NFV IFA008 specification |
pCR revised to S5-165276 |
Intel Corporation (UK) Ltd | 28.52 0.6.1 |
S5-109 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-165062 | pCR TS 28.520 change the terminologies related to legacy PM data |
pCR revised to S5-165277 |
Intel Corporation (UK) Ltd | 28.52 0.6.1 |
S5-109 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-165063 | pCR 32.856 Skeleton for new clause 5 | pCR | ORANGE, Huawei | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-165064 | pCR 32.856 Proposed text for clause 5.1 | pCR | ORANGE, Huawei | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-165065 | pCR 32.856 Proposed text for clause 5.2 |
pCR revised to S5-165130 |
ORANGE, Huawei | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
revised | [WTS] [JSN] | ||
S5-165066 | pCR 32.856 Proposed text for clause 5.3 |
pCR revised to S5-165131 |
ORANGE, Huawei | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
revised | [WTS] [JSN] | ||
S5-165067 | pCR 32.856 Update Scope |
pCR revised to S5-165315 |
ORANGE, Huawei | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
revised | [WTS] [JSN] | ||
S5-165068 | pCR 32.856 Align clause 4 with ES 203 228 v1.1.5 | pCR | ORANGE | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-165069 | pCR 28.525 Fetch use case clarification | pCR | Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165070 | pCR 28.525 Fetch On-boarded VNF Package Artifacts operation |
pCR revised to S5-165289 |
Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-165071 | pCR 28.525 Abort VNF Package deletion operation |
pCR revised to S5-165290 |
Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-165072 | pCR 28.525 Update NSD operation |
pCR revised to S5-165291 |
Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-165073 | pCR 28.525 Delete NSD operation not in use |
pCR revised to S5-165292 |
Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-165074 | pCR 28.525 Delete NSD operation when in use | pCR | Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165075 | pCR 28.525 Query NSD operation | pCR | Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165076 | pCR 28.525 On-board PNFD operation | pCR | Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165077 | pCR 32.865 Cell merging correction | pCR | Cisco Systems Inc. | 32.865 0.4.0 |
S5-109 AI: 6.5.2 |
noted | [WTS] [JSN] | ||
S5-165078 | pCR 32.865 Cell splitting correction | pCR | Cisco Systems Inc. | 32.865 0.4.0 |
S5-109 AI: 6.5.2 |
noted | [WTS] [JSN] | ||
S5-165079 | Discussion Paper on 4G network slicing (IoT) management | discussion | Cisco Systems Inc. |
S5-109 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-165080 | New WID for Study on Management and Orchestration of Network Slicing (IoT) in 4G |
SID new revised to S5-165201 |
Cisco Systems Inc. | Rel-14 |
S5-109 AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-165081 | Add missing Annex | draftCR | Ericsson LM | Rel-13 |
S5-109 AI: 6.3 |
approved | [WTS] [JSN] | ||
S5-165082 | Rel-14 CR 32.103 Alignment with latest SA5 specification list and various enhancements | CR | Huawei, Ericsson | 32.103 13.0.0 CR#14 catC | Rel-14 |
S5-109 AI: 6.3 |
withdrawn | [WTS] [JSN] | |
S5-165083 | Discussion paper of the management for supporting RAN virtualization | discussion | Intel Corporation (UK) Ltd | Rel-14 |
S5-109 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-165084 | NEW SID Study on management aspects of the RAN virtualization |
SID new revised to S5-165202 |
Intel Corporation (UK) Ltd | Rel-14 |
S5-109 AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-165085 | Add virtualized resources related performance measurements | CR | Intel Corporation (UK) Ltd | 32.426 13.0.0 CR#65 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-109 AI: 6.4.1.4 |
not pursued | [WTS] [JSN] |
S5-165086 | pCR TS 28.526 add VNF termination procedure |
pCR revised to S5-165293 |
Intel Corporation (UK) Ltd | 28.526 0.2.0 |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-165087 | Discussion paper on direct consumption of VR PM by NM | discussion | Nokia Networks | OAM14-MAMO_VNF-MCAR, OAM14-MAMO_VNF-PM |
S5-109 AI: 6.4.1.4 |
noted | [WTS] [JSN] | ||
S5-165088 | Discussion paper - Considerations for the VNF instantiation requested by EM | discussion | Nokia Networks |
S5-109 AI: 6.4.1.5 |
noted | [WTS] [JSN] | |||
S5-165089 | pCR TS 28.525 Update Use Case VNF instantiation initiated through Itf-N |
pCR revised to S5-165295 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165090 | Discussion paper - options for initial configuration data in VNF instantiation | discussion | Nokia Networks | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
endorsed | [WTS] [JSN] | ||
S5-165091 | pCR TS 28.525 Add UCs for initial configuration data in VNF instantiation |
pCR revised to S5-165297 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165092 | pCR TS 28.526 Add procedure for initial configuration data in VNF instantiation |
pCR revised to S5-165298 |
Nokia Networks | 28.526 0.2.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165093 | Discussion paper - scenarios for NS update | other | Nokia Networks | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
noted | [WTS] [JSN] | ||
S5-165094 | pCR TS 28.525 Add Use Cases for NS update with add VL and VNF |
pCR revised to S5-165300 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165095 | pCR TS 28.525 Add Use Case for NS update with add SAP |
pCR revised to S5-165301 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165096 | pCR TS 28.525 Add Use Case for NS instantiate with existing VNFs and new VL |
pCR revised to S5-165302 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165097 | pCR TS 28.525 Add Use Case for NS instantiate with existing NSs and new VL |
pCR revised to S5-165303 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165098 | pCR 28.510 Add MOI deletion requirement |
pCR revised to S5-165252 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165099 | pCR 28.510 Add traceabilities of MOI configuration requirements |
pCR revised to S5-165253 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165100 | pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated | pCR | ZTE Corporation | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-165101 | draft TS 28.513 skeleton |
draft TS revised to S5-165254 |
ZTE Corporation | Rel-14 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165102 | pCR TS 28.513 Add introduction and scope | pCR | ZTE Corporation | 28.513 0.0.0 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165103 | Presentation TS 28.510 to SA for information |
TS or TR cover revised to S5-165278 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-165104 | New Section on Determination of Completeness of Charging Information in IMS |
CR revised to S5-165226 |
Deutsche Telekom AG | 32.24 14.0.0 CR#389 catB | 720045 | Rel-14 |
S5-109 AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-165105 | Discussion paper- enhancement of NRM to support the VNF |
discussion revised to S5-165255 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-165106 | Rel-13 CR 32.251 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 |
CR revised to S5-165236 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.251 13.5.0 CR#477 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165107 | Rel-13 CR 32.299 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 |
CR revised to S5-165237 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#743 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165108 | Rel-13 CR 32.298 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 |
CR revised to S5-165238 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#599 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165109 | Proposed LS to CT1 on DCCII |
LS out LS To: CT1 revised to S5-165227 |
Deutsche Telekom AG | 720045 | Rel-14 |
S5-109 AI: 7.4.2 |
revised | [WTS] [JSN] | |
S5-165110 | pCR TS 28.500 Consistency edits and clarifications |
pCR revised to S5-165244 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165111 | pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship |
pCR revised to S5-165245 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165112 | pCR TS 28.500 Aligning requirements and traceability on FM virtualization-specific use case | pCR | NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165113 | pCR TS 28.500 Aligning requirements and traceability on certain LCM use cases |
pCR revised to S5-165247 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165114 | Rel-13 CR 32.253 Remove Editor's Note on parameters over T6a- Alignment with TS 23.282 | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.253 13.0.0 CR#2 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165115 | Skeleton for 28.302 "Licensed Shared Access (LSA) Controller (LC) Integration Reference Point (IRP); Information Service" |
draft TS revised to S5-165310 |
RED Technologies SAS | OAM14-LSA | Rel-14 |
S5-109 AI: 6.4.3 |
revised | [WTS] [JSN] | |
S5-165116 | pCR TS 28.500 UC and requirements on automating different types of configuration | pCR | NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
noted | [WTS] [JSN] | ||
S5-165117 | pCR TS 28.525 Adding specification UCs and requirements related to updating NS |
pCR revised to S5-165304 |
NTT DOCOMO | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-165118 | Definition of operations and parameters |
pCR revised to S5-165311 |
RED Technologies SAS | 28.302 0.0.0 | OAM14-LSA |
S5-109 AI: 6.4.3 |
revised | [WTS] [JSN] | |
S5-165119 | pCR TS 28.500 Updating the NE and VNF concept |
pCR revised to S5-165246 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165120 | pCR TS 28.500 Adding the PM collection use case |
pCR revised to S5-165250 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165121 | Discussion TS 28.500 the collection machenism of VNF PM data related to virtualized resource | discussion | China Mobile Com. Corporation | Rel-14 |
S5-109 AI: 6.4.1.1 |
noted | [WTS] [JSN] | ||
S5-165122 | Revised WID Management concept, architecture and requirements for mobile networks that include virtualized network functions |
WID revised revised to S5-165373 |
China Mobile Com. Corporation | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | |
S5-165123 | New Study on a RESTful HTTP-based Solution Set |
SID new revised to S5-165203 |
Nokia Networks |
S5-109 AI: 6.2 |
revised | [WTS] [JSN] | |||
S5-165124 | Corrections according to EditHelp in 32.817 | pCR | Ericsson | 32.817 0.4.0 |
S5-109 AI: 6.4.2 |
approved | [WTS] [JSN] | ||
S5-165125 | pCR 32817 Remove Editor’s note about true file name | pCR | Ericsson | 32.817 0.4.0 |
S5-109 AI: 6.4.2 |
approved | [WTS] [JSN] | ||
S5-165126 | pCR Conclusion and Recommendations for TR 32.817 |
pCR revised to S5-165307 |
Ericsson | 32.817 0.4.0 |
S5-109 AI: 6.4.2 |
revised | [WTS] [JSN] | ||
S5-165127 | Presentation of Specification/Report to TSG: TR 32.817, Version 1.0.0 |
TS or TR cover revised to S5-165308 |
Ericsson |
S5-109 AI: 6.4.2 |
revised | [WTS] [JSN] | |||
S5-165128 | Reply to ETSI TC EE PS on ES 203 228 |
LS out LS is reply to S5-165044 LS To: ETSI TC EE PS |
ORANGE | Rel-14 |
S5-109 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-165129 | Reply to ETSI TC EE 02 on ES 202 336-12 |
LS out LS is reply to S5-165043 LS To: ETSI TC EE PS |
ORANGE | Rel-14 |
S5-109 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-165130 | pCR 32.856 Proposed text for clause 5.2 |
pCR revision of S5-165065 revised to S5-165316 |
ORANGE, Huawei | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
revised | [WTS] [JSN] | ||
S5-165131 | pCR 32.856 Proposed text for clause 5.3 |
pCR revision of S5-165066 |
ORANGE, Huawei | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
noted | [WTS] [JSN] | ||
S5-165132 | pCR TR 28.800 Add management architecture use case of reusing the existing management system for next generation network |
pCR revised to S5-165204 |
Huawei Technologies | 28.8 0.1.0 | FS_NGNS_MOA |
S5-109 AI: 6.5.4 |
revised | [WTS] [JSN] | |
S5-165133 | pCR TR 28.800 Add management use case for management and orchestration of the next generation network for build the new standalone management system | pCR | Huawei Technologies | 28.8 0.1.0 | FS_NGNS_MOA |
S5-109 AI: 6.5.4 |
merged | [WTS] [JSN] | |
S5-165134 | pCR TR 28.800 Add terminologies for network management and orchestration layering concept |
pCR revised to S5-165205 |
Huawei Technologies | 28.8 0.1.0 | FS_NGNS_MOA |
S5-109 AI: 6.5.4 |
revised | [WTS] [JSN] | |
S5-165135 | pCR TR 28.800 Add terminologies for network managmeent and orchestration/resource management and orchestration |
pCR revised to S5-165206 |
Huawei Technologies | 28.8 0.1.0 | FS_NGNS_MOA |
S5-109 AI: 6.5.4 |
revised | [WTS] [JSN] | |
S5-165136 | pCR TR 28.801 Progress overview on network slicing in SA1, SA2, NGMN and analysis of potential management related aspects |
pCR revised to S5-165210 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165137 | pCR TR 28.801 Adding use case for creating network slices with common and slice specific NFs |
pCR revised to S5-165217 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165138 | pCR TR 28.801 Adding use case for modifying network slices with common and slice specific NFs |
pCR revised to S5-165218 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165139 | pCR TR 28.801 Adding use case for terminating network slices with common and slice specific NFs |
pCR revised to S5-165219 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165140 | pCR TR 28.801 Adding resource isolation terminologies for network slicing |
pCR revised to S5-165220 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165141 | pCR TR 28.801 adding slice management related teminology | pCR | Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
merged | [WTS] [JSN] | |
S5-165142 | Discussion of Network Slicing Descriptor | discussion | Huawei Technologies | FS_MONETS |
S5-109 AI: 6.5.5 |
noted | [WTS] [JSN] | ||
S5-165143 | pCR TR 28.801 Adding definitions for network slicing lifecycle management | pCR | Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
merged | [WTS] [JSN] | |
S5-165144 | pCR TR 28.801 use case for network slice lifecycle management |
pCR revised to S5-165216 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165145 | pCR TR 28.801 High level use case for creating two new slice instances for different end user services |
pCR revised to S5-165214 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165146 | pCR TR 28.802 add use case for supporting cric management case |
pCR revised to S5-165221 |
Huawei Technologies | 28.802 0.1.0 | FS_MAN_NGNAF |
S5-109 AI: 6.5.6 |
revised | [WTS] [JSN] | |
S5-165147 | Adding Chapter and content for Concepts and Background | other | Ericsson LM |
S5-109 AI: 6.5.6 |
withdrawn | [WTS] [JSN] | |||
S5-165148 | Adding Network Slice and related Definitions | other | Ericsson LM |
S5-109 AI: 6.5.6 |
withdrawn | [WTS] [JSN] | |||
S5-165149 | High level use case for creating two new network slice instances for different end user services | other | Ericsson LM |
S5-109 AI: 6.5.6 |
withdrawn | [WTS] [JSN] | |||
S5-165150 | pCR TS 28.500 Align the usage of term on non-application | pCR | Huawei Technologies | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165151 | pCR TS 28.510 Align the usage of term on non-application | pCR | Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165152 | pCR TS 28.510 Modify use case of MO creation after VNF instantiation with VNF instance indentifier | pCR | Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-165153 | pCR TS 28.510 Adding the requirement and use case for createMO with trigger of VNF instantiation |
pCR revised to S5-165259 |
Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165154 | pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation |
pCR revised to S5-165262 |
Huawei Technologies | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165155 | pCR TS 28.515 Adding VNF alarm notification subscription requirement on Ve-vnfm-em |
pCR revised to S5-165265 |
Huawei Technologies | 28.515 0.6.1 |
S5-109 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-165156 | pCR TS 28.515 Rapporteur proposal | pCR | Huawei Technologies | 28.515 0.6.1 |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-165157 | Presentation sheet TS 28.515 for information to SA | TS or TR cover | Huawei Technologies |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | |||
S5-165158 | Presentation sheet TS 28.516 for information to SA | TS or TR cover | Huawei Technologies |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | |||
S5-165159 | pCR TS 28.517 Adding VNF alarm notification subscription stage 2 on Ve-vnfm-em |
pCR revised to S5-165268 |
Huawei Technologies | 28.517 0.2.0 |
S5-109 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-165160 | pCR TS 28.517 Adding alarm Information Model on Ve-Vnfm-em |
pCR revised to S5-165269 |
Huawei Technologies | 28.517 0.2.0 |
S5-109 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-165161 | pCR TS 28.518 Adding stage 3 content |
pCR revised to S5-165270 |
Huawei Technologies | 28.518 0.2.0 |
S5-109 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-165162 | Revised WID Study on Management and Orchestration of Network Slicing for next generation network | other | Ericsson LM |
S5-109 AI: 6.1 |
withdrawn | [WTS] [JSN] | |||
S5-165163 | Revised WID Study on Management and Orchestration of Network Slicing for next generation network | SID revised | Ericsson LM | FS_MONETS |
S5-109 AI: 6.5.5 |
agreed | [WTS] [JSN] | ||
S5-165164 | Update of Scope |
pCR revised to S5-165209 |
Ericsson LM | 28.801 0.1.0 |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | ||
S5-165165 | Adding Chapter and content for Concepts and Background |
pCR revised to S5-165212 |
Ericsson LM | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165166 | pCR TS 28.510 add the relationship between VNF termination and MO deletion | pCR | Intel Corporation (UK) Ltd | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-165167 | Adding Network Slice and related Definitions |
pCR revised to S5-165213 |
Ericsson LM | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165168 | pCR TS 28.511 add CM procedures for the VNF instantiation | pCR | Intel Corporation (UK) Ltd | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-165169 | pCR TS 28.511 add CM procedures for the VNF termination |
pCR revised to S5-165264 |
Intel Corporation (UK) Ltd | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165170 | High level use case for creating two new network slice instances for different end user services | pCR | Ericsson LM | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
merged | [WTS] [JSN] | |
S5-165171 | Addition of use cases |
pCR revised to S5-165313 |
Nokia Networks | 28.301 0.3.0 |
S5-109 AI: 6.4.3 |
revised | [WTS] [JSN] | ||
S5-165172 | pCR TR 32.880 overview of protocols based on socket API |
pCR revised to S5-165314 |
China Mobile | 32.88 0.3.0 | FS_OAM_AP_Itf-N |
S5-109 AI: 6.5.3 |
revised | [WTS] [JSN] | |
S5-165173 | Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM |
pCR revised to S5-165267 |
Ericsson Inc. | 28.515 0.6.1 |
S5-109 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-165174 | Add UC Fetch VNF related VR PM data produced by VNFM | pCR | Ericsson Inc. | 28.52 0.6.1 |
S5-109 AI: 6.4.1.4 |
noted | [WTS] [JSN] | ||
S5-165175 | Relation between NRM class and VNF/VNFC (implemented in VNFM) |
discussion revised to S5-165256 |
Ericsson Inc. |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-165176 | Problem of VL instance creation | discussion | Ericsson Inc. |
S5-109 AI: 6.4.1.5 |
noted | [WTS] [JSN] | |||
S5-165177 | Add UC in 28.525 supporting Bulk MOIs creations | pCR | Ericsson Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
withdrawn | [WTS] [JSN] | ||
S5-165178 | R14 CR TS32.277 Message flow for Direct Communication via UE-to-Network Relay |
CR revised to S5-165228 |
Huawei | 32.277 13.0.0 CR#15 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-165179 | R14 CR TS32.277 Message flow for Model B of ProSe Direct Discovery |
CR revised to S5-165229 |
Huawei | 32.277 13.0.0 CR#16 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-165180 | R14 CR TS32.277 Message flow for ProSe One-to-One Direct Communication |
CR revised to S5-165230 |
Huawei | 32.277 13.0.0 CR#17 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-165181 | R14 CR TS32.277 Message flow for Restricted Discovery |
CR revised to S5-165231 |
Huawei | 32.277 13.0.0 CR#18 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-165182 | R14 CR TS32.277 Supplement for the ProSe Discovery and Communication |
CR revised to S5-165232 |
Huawei | 32.277 13.0.0 CR#19 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-165183 | R14 CR TS32.251 Correction on the General Description |
CR revised to S5-165239 |
Huawei | 32.251 13.5.0 CR#478 catF | CH14 | Rel-14 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165184 | New WID Charging aspects of Improvements of Awareness of User Location Change |
WID new revised to S5-165224 |
Huawei |
S5-109 AI: 7.2 |
revised | [WTS] [JSN] | |||
S5-165185 | Possibility to terminate the charging session when no quota required |
other revised to S5-165225 |
Ericsson LM | CH14-ROPOCH | Rel-14 |
S5-109 AI: 7.4.1 |
revised | [WTS] [JSN] | |
S5-165186 | Discussion of Control and User Plane Split | discussion | Huawei Tech.(UK) Co., Ltd |
S5-109 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-165187 | New WID Study on mandatory AVP for 3GPP Diameter Accounting and Credit-Control Applications |
SID new revised to S5-165222 |
Nokia, Alcatel-Lucent Shanghai Bell |
S5-109 AI: 7.2 |
revised | [WTS] [JSN] | |||
S5-165188 | Draft CR 32.103 Alignment with latest SA5 specification list and various enhancements | draftCR | Huawei, Ericsson | Rel-13 |
S5-109 AI: 6.3 |
approved | [WTS] [JSN] | ||
S5-165189 | Rel-13 CR 32.251 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 |
CR revised to S5-165240 |
Nokia, Alcatel-Lucent Shanghai Bell, Vodafone | 32.251 13.5.0 CR#479 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165190 | Rel-13 CR 32.299 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 |
CR revised to S5-165241 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#744 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165191 | Rel-13 CR 32.298 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 |
CR revised to S5-165279 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#600 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
revised | [WTS] [JSN] |
S5-165192 | LS from BBF to SA5 on Proposed TR-196i2 Corrigendum 3 |
LS in LS reply in S5-165199, S5-165199, S5-165320 |
BBF |
S5-109 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-165193 | LS from ETSI NFV to SA5 on NFV Interface and Architecture specifications | LS in | ETSI ISG NFV |
S5-109 AI: 6.1 |
postponed | [WTS] [JSN] | |||
S5-165194 | Discussion sequence proposal for 6.5.5 | discussion | Ericsson LM | FS_MONETS |
S5-109 AI: 6.5.5 |
noted | [WTS] [JSN] | ||
S5-165195 | NGMN NWMO presentation | other | Huawei |
S5-109 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-165196 | Reply to: Resubmitted LS from ATIS NRSC to SA5 on RE: Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network |
LS out LS is reply to S5-165039 LS To: ATIS revised to S5-165319 |
Ericsson |
S5-109 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-165197 | Discussion Sequence Proposal for 6.4.1.2 | other | ZTE |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-165198 | Response LS from RAN2 cc SA5 on QoE reporting for streaming services | LS in | R2-165972 |
S5-109 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-165199 | Reply to: LS from BBF to SA5 on Proposed TR-196i2 Corrigendum 3 |
LS out LS is reply to S5-165192 LS To: BBF revised to S5-165320 |
Ericsson |
S5-109 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-165200 | Informal presentation of draft LS NFV(16)000252 - LS OUT to 3GPP SA5 informing about update to application view in IFA015 | other | Nokia Networks |
S5-109 AI: 6.4.1.1 |
noted | [WTS] [JSN] | |||
S5-165201 | New SID for Study on Management and Orchestration of Network Slicing (IoT) in 4G |
SID new revision of S5-165080 revised to S5-165322 |
Cisco Systems Inc. | Rel-14 |
S5-109 AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-165202 | NEW SID Study on management aspects of the RAN virtualization |
SID new revision of S5-165084 revised to S5-165323 |
Intel Corporation (UK) Ltd | Rel-14 |
S5-109 AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-165203 | New Study on a RESTful HTTP-based Solution Set |
SID new revision of S5-165123 revised to S5-165324 |
Nokia Networks |
S5-109 AI: 6.2 |
revised | [WTS] [JSN] | |||
S5-165204 | pCR TR 28.800 Add management architecture use case of reusing the existing management system for next generation network |
pCR revision of S5-165132 |
Huawei Technologies | 28.8 0.1.0 | FS_NGNS_MOA |
S5-109 AI: 6.5.4 |
approved | [WTS] [JSN] | |
S5-165205 | pCR TR 28.800 Add terminologies for network management and orchestration layering concept |
pCR revision of S5-165134 revised to S5-165355 |
Huawei Technologies | 28.8 0.1.0 | FS_NGNS_MOA |
S5-109 AI: 6.5.4 |
revised | [WTS] [JSN] | |
S5-165206 | pCR TR 28.800 Add terminologies for network managmeent and orchestration/resource management and orchestration |
pCR revision of S5-165135 revised to S5-165356 |
Huawei Technologies | 28.8 0.1.0 | FS_NGNS_MOA |
S5-109 AI: 6.5.4 |
revised | [WTS] [JSN] | |
S5-165207 | pCR TS 28.525 Rapproteur proposal | pCR | Nokia Networks | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165208 | 28.525 presentation sheet to SA |
TS or TR cover revised to S5-165305 |
Nokia Networks |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |||
S5-165209 | Update of Scope |
pCR revision of S5-165164 revised to S5-165364 |
Ericsson LM | 28.801 0.1.0 |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | ||
S5-165210 | pCR TR 28.801 Progress overview on network slicing in SA1, SA2, NGMN and analysis of potential management related aspects |
pCR revision of S5-165136 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-165211 | Enhancements to offline charging for IMS | discussion | AT&T |
S5-109 AI: 7.4.2 |
noted | [WTS] [JSN] | |||
S5-165212 | Adding Chapter and content for Concepts and Background |
pCR revision of S5-165165 revised to S5-165365 |
Ericsson LM | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165213 | Adding Network Slice and related Definitions |
pCR revision of S5-165167 |
Ericsson LM | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
noted | [WTS] [JSN] | |
S5-165214 | pCR TR 28.801 High level use case for creating two new slice instances for different end user services |
pCR revision of S5-165145 revised to S5-165328 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165215 | OAM&P SWG action list |
other revision of S5-165035 revised to S5-165318 |
WG Vice Chair (Huawei) |
S5-109 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-165216 | pCR TR 28.801 use case for network slice lifecycle management |
pCR revision of S5-165144 revised to S5-165362 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165217 | pCR TR 28.801 Adding use case for creating network slices with common and slice specific NFs |
pCR revision of S5-165137 revised to S5-165358 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165218 | pCR TR 28.801 Adding use case for modifying network slices with common and slice specific NFs |
pCR revision of S5-165138 revised to S5-165359 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165219 | pCR TR 28.801 Adding use case for terminating network slices with common and slice specific NFs |
pCR revision of S5-165139 revised to S5-165360 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165220 | pCR TR 28.801 Adding resource isolation terminologies for network slicing |
pCR revision of S5-165140 revised to S5-165361 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165221 | pCR TR 28.802 add use case for supporting cric management case |
pCR revision of S5-165146 revised to S5-165366 |
Huawei Technologies | 28.802 0.1.0 | FS_MAN_NGNAF |
S5-109 AI: 6.5.6 |
revised | [WTS] [JSN] | |
S5-165222 | New WID Study on mandatory AVP for 3GPP Diameter Accounting and Credit-Control Applications |
SID new revision of S5-165187 |
Nokia, Alcatel-Lucent Shanghai Bell |
S5-109 AI: 7.2 |
agreed | [WTS] [JSN] | |||
S5-165223 | Reply LS to LS reply from CT4 to SA5 on progress of the work on Diameter Base Protocol Update |
LS out LS is reply to S5-165041 LS To: CT4 |
Nokia, Alcatel-Lucent Shanghai Bell |
S5-109 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-165224 | New WID Charging aspects of Improvements of Awareness of User Location Change |
WID new revision of S5-165184 |
Huawei |
S5-109 AI: 7.2 |
agreed | [WTS] [JSN] | |||
S5-165225 | Possibility to terminate the charging session when no quota required |
other revision of S5-165185 |
Ericsson LM | CH14-ROPOCH | Rel-14 |
S5-109 AI: 7.4.1 |
approved | [WTS] [JSN] | |
S5-165226 | New Section on Determination of Completeness of Charging Information in IMS |
CR revision of S5-165104 |
Deutsche Telekom AG | 32.24 14.0.0 CR#3891 catB | 720045 | Rel-14 |
S5-109 AI: 7.4.2 |
agreed | [WTS] [JSN] |
S5-165227 | LS to CT1 on Determination of Completeness of Charging Information in IMS |
LS out LS To: CT1 revision of S5-165109 revised to S5-165371 |
Deutsche Telekom AG | 720045 | Rel-14 |
S5-109 AI: 7.4.2 |
revised | [WTS] [JSN] | |
S5-165228 | R14 CR TS32.277 Message flow for Direct Communication via UE-to-Network Relay |
CR revision of S5-165178 |
Huawei | 32.277 13.0.0 CR#151 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-165229 | R14 CR TS32.277 Message flow for Model B of ProSe Direct Discovery |
CR revision of S5-165179 |
Huawei | 32.277 13.0.0 CR#161 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-165230 | R14 CR TS32.277 Message flow for ProSe One-to-One Direct Communication |
CR revision of S5-165180 |
Huawei | 32.277 13.0.0 CR#171 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-165231 | R14 CR TS32.277 Message flow for Restricted Discovery |
CR revision of S5-165181 |
Huawei | 32.277 13.0.0 CR#181 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-165232 | R14 CR TS32.277 Supplement for the ProSe Discovery and Communication |
CR revision of S5-165182 |
Huawei | 32.277 13.0.0 CR#191 catB | CH14-ProSe | Rel-14 |
S5-109 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-165233 | Rel-13 CR 32.251 Correction on Non-IP PDP type - alignement with TS 29.061 |
CR revision of S5-165053 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.251 13.5.0 CR#4751 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165234 | Rel-13 CR 32.298 Correction on Non-IP PDP type -alignement with TS 29.061 |
CR revision of S5-165054 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#5971 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165235 | Rel-13 CR 32.251 Correction on RAT Type for charging SMS in MME |
CR revision of S5-165056 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.251 13.5.0 CR#4761 catF | SIMTC-CH, CH13 | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165236 | Rel-13 CR 32.251 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 |
CR revision of S5-165106 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.251 13.5.0 CR#4771 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165237 | Rel-13 CR 32.299 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 |
CR revision of S5-165107 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#7431 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165238 | Rel-13 CR 32.298 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 |
CR revision of S5-165108 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#5991 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165239 | R14 CR TS32.251 Correction on the General Description |
CR revision of S5-165183 |
Huawei | 32.251 13.5.0 CR#4781 catF | CH14 | Rel-14 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165240 | Rel-13 CR 32.251 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 |
CR revision of S5-165189 |
Nokia, Alcatel-Lucent Shanghai Bell, Vodafone | 32.251 13.5.0 CR#4791 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165241 | Rel-13 CR 32.299 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 |
CR revision of S5-165190 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#7441 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165242 | Process for management of draft TSs/TRs |
other revision of S5-165013 |
WG Chairman |
S5-109 AI: 5.1 |
approved | [WTS] [JSN] | |||
S5-165243 | SA5 Meeting Calendar |
other revision of S5-165010 |
WG Vice Chair (Huawei) |
S5-109 AI: 5.4 |
noted | [WTS] [JSN] | |||
S5-165244 | pCR TS 28.500 Consistency edits and clarifications |
pCR revision of S5-165110 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165245 | pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship |
pCR revision of S5-165111 revised to S5-165325 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165246 | pCR TS 28.500 Updating the NE and VNF concept |
pCR revision of S5-165119 revised to S5-165326 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165247 | pCR TS 28.500 Aligning requirements and traceability on certain LCM use cases |
pCR revision of S5-165113 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165248 | pCR TS 28.500 UC and requirements on automating different types of configuration | pCR | NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] | ||
S5-165249 | Revised WID Filtering of PM measurements and data volume measurements for shared networks |
WID revised revised to S5-165309 |
Ericsson | OAM14-FILMEAS |
S5-109 AI: 6.4.2 |
revised | [WTS] [JSN] | ||
S5-165250 | pCR TS 28.500 Adding the PM collection use case |
pCR revision of S5-165120 revised to S5-165331 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165251 | pCR TS 28.500 Align the usage of term on non-application | pCR | Huawei Technologies | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] | ||
S5-165252 | pCR 28.510 Add MOI deletion requirement |
pCR revision of S5-165098 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165253 | pCR 28.510 Add traceabilities of MOI configuration requirements |
pCR revision of S5-165099 revised to S5-165332 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165254 | draft TS 28.513 skeleton |
draft TS revision of S5-165101 |
ZTE Corporation | Rel-14 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165255 | Discussion paper- enhancement of NRM to support the VNF |
discussion revision of S5-165105 revised to S5-165335 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-165256 | Relation between NRM class and VNF/VNFC (implemented in VNFM) |
discussion revision of S5-165175 |
Ericsson Inc. |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-165257 | pCR TS 28.510 Align the usage of term on non-application | pCR | Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165258 | pCR TS 28.510 Modify use case of MO creation after VNF instantiation with VNF instance indentifier | pCR | Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165259 | pCR TS 28.510 Adding the requirement and use case for createMO with trigger of VNF instantiation |
pCR revision of S5-165153 |
Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165260 | pCR TS 28.510 add the relationship between VNF termination and MO deletion | pCR | Intel Corporation (UK) Ltd | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165261 | pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated | pCR | ZTE Corporation | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165262 | pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation |
pCR revision of S5-165154 revised to S5-165336 |
Huawei Technologies | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165263 | pCR TS 28.511 add CM procedures for the VNF instantiation | pCR | Intel Corporation (UK) Ltd | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165264 | pCR TS 28.511 add CM procedures for the VNF termination |
pCR revision of S5-165169 |
Intel Corporation (UK) Ltd | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165265 | pCR TS 28.515 Adding VNF alarm notification subscription requirement on Ve-vnfm-em |
pCR revision of S5-165155 revised to S5-165337 |
Huawei Technologies | 28.515 0.6.1 |
S5-109 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-165266 | pCR TS 28.515 Rapporteur proposal | pCR | Huawei Technologies | 28.515 0.6.1 |
S5-109 AI: 6.4.1.3 |
withdrawn | [WTS] [JSN] | ||
S5-165267 | Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM |
pCR revision of S5-165173 revised to S5-165341 |
Ericsson Inc. | 28.515 0.6.1 |
S5-109 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-165268 | pCR TS 28.517 Adding VNF alarm notification subscription stage 2 on Ve-vnfm-em |
pCR revision of S5-165159 |
Huawei Technologies | 28.517 0.2.0 |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-165269 | pCR TS 28.517 Adding alarm Information Model on Ve-Vnfm-em |
pCR revision of S5-165160 |
Huawei Technologies | 28.517 0.2.0 |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-165270 | pCR TS 28.518 Adding stage 3 content |
pCR revision of S5-165161 |
Huawei Technologies | 28.518 0.2.0 |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-165271 | pCR 28.500-110 update based on the reviews from edithelp | pCR | China Mobile | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165272 | pCR TS 28.523 add introduction and scope |
pCR revision of S5-165059 |
Intel Corporation (UK) Ltd | 28.523 0.0.0 |
S5-109 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-165273 | TDoc sequence proposal for 6.5.1 | other | Orange |
S5-109 AI: 6.5.1 |
noted | [WTS] [JSN] | |||
S5-165274 | pCR TS 28.522 add stage 2 solutions |
pCR revision of S5-165060 |
Intel Corporation (UK) Ltd | 28.522 0.1.0 |
S5-109 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-165275 | Addressing EditHelp's comments | pCR | China Mobile | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] | ||
S5-165276 | pCR TS 28.520 add reference to ETSI GS NFV IFA008 specification |
pCR revision of S5-165061 |
Intel Corporation (UK) Ltd | 28.52 0.6.1 |
S5-109 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-165277 | pCR TS 28.520 change the terminologies related to legacy PM data |
pCR revision of S5-165062 revised to S5-165344 |
Intel Corporation (UK) Ltd | 28.52 0.6.1 |
S5-109 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-165278 | Presentation TS 28.510 to SA for information |
TS or TR cover revision of S5-165103 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | |||
S5-165279 | Rel-13 CR 32.298 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 |
CR revision of S5-165191 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#6001 catF | CIoT-CH | Rel-13 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165280 | Reply LS to Response LSs on Control Plane CIoT Optimisation Indicator propagated to PGW for charging purpose |
LS out LS is reply to S5-165046 LS To: SA2,CT4 |
Nokia, Alcatel-Lucent Shanghai Bell |
S5-109 AI: 7.3 |
approved | [WTS] [JSN] | |||
S5-165281 | Draft CR General description for Gy Session Optimization | draftCR | Ericsson | Rel-13 |
S5-109 AI: 7.4.1 |
approved | [WTS] [JSN] | ||
S5-165282 | Rel-14 CR 32.299 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#745 catA | CIoT-CH | Rel-14 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165283 | Meeting co-location with CT WGs in second quarter 2017 for SA5 SWG CH | other | Charging SWG Chair |
S5-109 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-165284 | Rel-14 CR 32.299 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 | CR | Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#746 catA | CIoT-CH | Rel-14 |
S5-109 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-165285 | draft TR 32.817 | draft TR | Ericsson | Rel-14 |
S5-109 AI: 6.4.2 |
approved | [WTS] [JSN] | ||
S5-165286 | Draft TS 28.302 | draft TS | Nokia | Rel-14 |
S5-109 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-165287 | Draft TR 32.856 | draft TR | ORANGE | Rel-14 |
S5-109 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-165288 | Draft TR 32.880 | draft TR | China Mobile | Rel-14 |
S5-109 AI: 6.5.3 |
approved | [WTS] [JSN] | ||
S5-165289 | pCR 28.525 Fetch On-boarded VNF Package Artifacts operation |
pCR revision of S5-165070 |
Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165290 | pCR 28.525 Abort VNF Package deletion operation |
pCR revision of S5-165071 |
Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165291 | pCR 28.525 Update NSD operation |
pCR revision of S5-165072 |
Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165292 | pCR 28.525 Delete NSD operation not in use |
pCR revision of S5-165073 |
Cisco Systems Inc. | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165293 | pCR TS 28.526 add VNF termination procedure |
pCR revision of S5-165086 |
Intel Corporation (UK) Ltd | 28.526 0.2.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165294 | LS to IFA on the use of un-instantiated VNF instance ID in UpdateNS operation |
LS out revised to S5-165317 |
Noikia Networks |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |||
S5-165295 | pCR TS 28.525 Update Use Case VNF instantiation initiated through Itf-N |
pCR revision of S5-165089 revised to S5-165348 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165296 | Discussion paper - options for initial configuration data in VNF instantiation | discussion | Nokia Networks | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
withdrawn | [WTS] [JSN] | ||
S5-165297 | pCR TS 28.525 Add UCs for initial configuration data in VNF instantiation |
pCR revision of S5-165091 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |
S5-165298 | pCR TS 28.526 Add procedure for initial configuration data in VNF instantiation |
pCR revision of S5-165092 |
Nokia Networks | 28.526 0.2.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |
S5-165299 | LSout to ETSI ISG NFV IFA WG on update NS scenarios |
LS out LS To: ETSI NFV IFA revised to S5-165372 |
Nokia Networks |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |||
S5-165300 | pCR TS 28.525 Add Use Cases for NS update with add VL and VNF |
pCR revision of S5-165094 revised to S5-165349 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165301 | pCR TS 28.525 Add Use Case for NS update with add SAP |
pCR revision of S5-165095 revised to S5-165350 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165302 | pCR TS 28.525 Add Use Case for NS instantiate with existing VNFs and new VL |
pCR revision of S5-165096 revised to S5-165351 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165303 | pCR TS 28.525 Add Use Case for NS instantiate with existing NSs and new VL |
pCR revision of S5-165097 revised to S5-165352 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |
S5-165304 | pCR TS 28.525 Adding specification UCs and requirements related to updating NS |
pCR revision of S5-165117 |
NTT DOCOMO | 28.525 0.7.0 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165305 | 28.525 presentation sheet to SA |
TS or TR cover revision of S5-165208 |
Nokia Networks |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |||
S5-165306 | Cover sheet TS 28.520 | TS or TR cover | Intel |
S5-109 AI: 6.4.1.4 |
approved | [WTS] [JSN] | |||
S5-165307 | pCR Conclusion and Recommendations for TR 32.817 |
pCR revision of S5-165126 |
Ericsson | 32.817 0.4.0 |
S5-109 AI: 6.4.2 |
approved | [WTS] [JSN] | ||
S5-165308 | Presentation of Specification/Report to TSG: TR 32.817, Version 1.0.0 |
TS or TR cover revision of S5-165127 |
Ericsson |
S5-109 AI: 6.4.2 |
approved | [WTS] [JSN] | |||
S5-165309 | Revised WID Filtering of PM measurements and data volume measurements for shared networks |
WID revised revision of S5-165249 |
Ericsson | OAM14-FILMEAS |
S5-109 AI: 6.4.2 |
agreed | [WTS] [JSN] | ||
S5-165310 | Skeleton for 28.302 "Licensed Shared Access (LSA) Controller (LC) Integration Reference Point (IRP); Information Service" |
draft TS revision of S5-165115 |
RED Technologies SAS | OAM14-LSA | Rel-14 |
S5-109 AI: 6.4.3 |
approved | [WTS] [JSN] | |
S5-165311 | Definition of operations and parameters |
pCR revision of S5-165118 |
RED Technologies SAS | 28.302 0.0.0 | OAM14-LSA |
S5-109 AI: 6.4.3 |
noted | [WTS] [JSN] | |
S5-165312 | pCR TS 28.510 Rapporteur proposal | pCR | ZTE | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165313 | Addition of use cases |
pCR revision of S5-165171 |
Nokia Networks | 28.301 0.3.0 |
S5-109 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-165314 | pCR TR 32.880 overview of protocols based on socket API |
pCR revision of S5-165172 |
China Mobile | 32.88 0.3.0 | FS_OAM_AP_Itf-N |
S5-109 AI: 6.5.3 |
approved | [WTS] [JSN] | |
S5-165315 | pCR 32.856 Update Scope |
pCR revision of S5-165067 |
ORANGE, Huawei | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-165316 | pCR 32.856 Proposed text for clause 5.2 |
pCR revision of S5-165130 |
ORANGE, Huawei | 32.856 0.3.0 |
S5-109 AI: 6.5.1 |
approved | [WTS] [JSN] | ||
S5-165317 | LSout to ETSI ISG NFV IFA WG on the use of un-instantiated VNF instance ID in UpdateNS operation |
LS out LS To: ETSI NFV IFA revision of S5-165294 revised to S5-165353 |
Noikia Networks |
S5-109 AI: 6.4.1.5 |
revised | [WTS] [JSN] | |||
S5-165318 | OAM&P SWG action list |
other revision of S5-165215 |
WG Vice Chair (Huawei) |
S5-109 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-165319 | Reply to: Resubmitted LS from ATIS NRSC to SA5 on RE: Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network |
LS out LS is reply to S5-165039 LS To: ATIS revision of S5-165196 |
Ericsson |
S5-109 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-165320 | Reply to: LS from BBF to SA5 on Proposed TR-196i2 Corrigendum 3 |
LS out LS is reply to S5-165192 LS To: BBF revision of S5-165199 |
Ericsson |
S5-109 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-165321 | LS on update of the work plan of stage 3 |
LS out LS To: ETSI ISG NFV IFA |
Huawei |
S5-109 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-165322 | New SID for Study on Management and Orchestration of Network Slicing (IoT) in 4G |
SID new revision of S5-165201 |
Cisco Systems Inc. | Rel-14 |
S5-109 AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-165323 | New SID Study on management aspects of virtualized network functions that are part of the RAN |
SID new revision of S5-165202 |
Intel Corporation (UK) Ltd | Rel-14 |
S5-109 AI: 6.2 |
not concluded | [WTS] [JSN] | ||
S5-165324 | New Study on a RESTful HTTP-based Solution Set |
SID new revision of S5-165203 |
Nokia Networks |
S5-109 AI: 6.2 |
agreed | [WTS] [JSN] | |||
S5-165325 | pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship |
pCR revision of S5-165245 |
NTT DOCOMO,China Mobile | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165326 | pCR TS 28.500 Updating the NE and VNF concept |
pCR revision of S5-165246 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165327 | new draft TS 28.500 | draft TS | China Mobile | Rel-14 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165328 | pCR TR 28.801 High level use case for creating two new slice instances for different end user services |
pCR revision of S5-165214 revised to S5-165363 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
revised | [WTS] [JSN] | |
S5-165329 | Study on management aspects of next generation network architecture and features | SID revised | Nokia | FS_MAN_NGNAF |
S5-109 AI: 6.5.6 |
agreed | [WTS] [JSN] | ||
S5-165330 | Study on OAM aspects of SON for AAS-based deployments | SID revised | Nokia | FS_OAM_SON_AAS |
S5-109 AI: 6.5.2 |
agreed | [WTS] [JSN] | ||
S5-165331 | pCR TS 28.500 Adding the PM collection use case |
pCR revision of S5-165250 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165332 | pCR 28.510 Add traceabilities of MOI configuration requirements |
pCR revision of S5-165253 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165333 | Draft TS 28.510 | draft TS | ZTE | Rel-14 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165334 | Draft TS 28.513 | draft TS | ZTE | Rel-14 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165335 | Discussion paper- enhancement of NRM to support the VNF |
discussion revision of S5-165255 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-165336 | pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation |
pCR revision of S5-165262 |
Huawei Technologies | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165337 | pCR TS 28.515 Adding VNF alarm notification subscription requirement on Ve-vnfm-em |
pCR revision of S5-165265 |
Huawei Technologies | 28.515 0.6.1 |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-165338 | Draft TS 28.515 | draft TS | Huawei | Rel-14 |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-165339 | Draft TS 28.517 | draft TS | Huawei | Rel-14 |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-165340 | Draft TS 28.518 | draft TS | Huawei | Rel-14 |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-165341 | Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM |
pCR revision of S5-165267 revised to S5-165368 |
Ericsson Inc. | 28.515 0.6.1 |
S5-109 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-165342 | Draft TS 28.522 | draft TS | Intel | Rel-14 |
S5-109 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-165343 | Draft TS 28.520 | draft TS | Intel | Rel-14 |
S5-109 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-165344 | pCR TS 28.520 change the terminologies related to legacy PM data |
pCR revision of S5-165277 |
Intel Corporation (UK) Ltd | 28.52 0.6.1 |
S5-109 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-165345 | Draft TS 28.523 | draft TS | Intel | Rel-14 |
S5-109 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-165346 | Draft TS 28.525 | draft TS | Nokia | Rel-14 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165347 | Draft TS 28.526 | draft TS | Nokia | Rel-14 |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-165348 | pCR TS 28.525 Update Use Case VNF instantiation initiated through Itf-N |
pCR revision of S5-165295 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |
S5-165349 | pCR TS 28.525 Add Use Cases for NS update with add VL and VNF |
pCR revision of S5-165300 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |
S5-165350 | pCR TS 28.525 Add Use Case for NS update with add SAP |
pCR revision of S5-165301 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |
S5-165351 | pCR TS 28.525 Add Use Case for NS instantiate with existing VNFs and new VL |
pCR revision of S5-165302 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |
S5-165352 | pCR TS 28.525 Add Use Case for NS instantiate with existing NSs and new VL |
pCR revision of S5-165303 |
Nokia Networks | 28.525 0.7.0 | OAM14-MAMO_VNF-LCM |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |
S5-165353 | LSout to ETSI ISG NFV IFA WG on the use of un-instantiated VNF instance ID in UpdateNS operation |
LS out LS To: ETSI NFV IFA revision of S5-165317 |
Noikia Networks |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |||
S5-165354 | Draft TR 28.800 | draft TR | Huawei | Rel-14 |
S5-109 AI: 6.5.4 |
approved | [WTS] [JSN] | ||
S5-165355 | pCR TR 28.800 Add terminologies for network management and orchestration layering concept |
pCR revision of S5-165205 |
Huawei Technologies | 28.8 0.1.0 | FS_NGNS_MOA |
S5-109 AI: 6.5.4 |
approved | [WTS] [JSN] | |
S5-165356 | pCR TR 28.800 Add terminologies for network managmeent and orchestration/resource management and orchestration |
pCR revision of S5-165206 |
Huawei Technologies | 28.8 0.1.0 | FS_NGNS_MOA |
S5-109 AI: 6.5.4 |
noted | [WTS] [JSN] | |
S5-165357 | Draft TR 28.801 | draft TR | Huawei | Rel-14 |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | ||
S5-165358 | pCR TR 28.801 Adding use case for creating network slices with common and slice specific NFs |
pCR revision of S5-165217 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-165359 | pCR TR 28.801 Adding use case for modifying network slices with common and slice specific NFs |
pCR revision of S5-165218 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-165360 | pCR TR 28.801 Adding use case for terminating network slices with common and slice specific NFs |
pCR revision of S5-165219 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-165361 | pCR TR 28.801 Adding resource isolation terminologies for network slicing |
pCR revision of S5-165220 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-165362 | pCR TR 28.801 use case for network slice lifecycle management |
pCR revision of S5-165216 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-165363 | pCR TR 28.801 High level use case for creating two new slice instances for different end user services |
pCR revision of S5-165328 |
Huawei Technologies | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-165364 | Update of Scope |
pCR revision of S5-165209 |
Ericsson LM | 28.801 0.1.0 |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | ||
S5-165365 | Adding Chapter and content for Concepts and Background |
pCR revision of S5-165212 |
Ericsson LM | 28.801 0.1.0 | FS_MONETS |
S5-109 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-165366 | pCR TR 28.802 add use case for supporting cric management case |
pCR revision of S5-165221 |
Huawei Technologies | 28.802 0.1.0 | FS_MAN_NGNAF |
S5-109 AI: 6.5.6 |
noted | [WTS] [JSN] | |
S5-165367 | Draft TS 28.511 | draft TS | ZTE | Rel-14 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165368 | Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM |
pCR revision of S5-165341 |
Ericsson Inc. | 28.515 0.6.1 |
S5-109 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-165369 | Draft TS 28.301 | draft TS | Nokia | Rel-14 |
S5-109 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-165370 | Draft TS 28.802 | draft TS | Nokia | Rel-14 |
S5-109 AI: 6.5.6 |
withdrawn | [WTS] [JSN] | ||
S5-165371 | LS to CT1 on Determination of Completeness of Charging Information in IMS |
LS out LS To: CT1 revision of S5-165227 |
Deutsche Telekom AG | 720045 | Rel-14 |
S5-109 AI: 7.4.2 |
approved | [WTS] [JSN] | |
S5-165372 | LSout to ETSI ISG NFV IFA WG on update NS scenarios |
LS out LS To: ETSI NFV IFA revision of S5-165299 |
Nokia Networks |
S5-109 AI: 6.4.1.5 |
approved | [WTS] [JSN] | |||
S5-165373 | Revised WID Management concept, architecture and requirements for mobile networks that include virtualized network functions |
WID revised revision of S5-165122 |
China Mobile Com. Corporation | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-109 AI: 6.4.1.1 |
agreed | [WTS] [JSN] | |
S5-165374 | OAM Executive Report from THIS Meeting |
report revision of S5-165005 |
WG Vice Chair (Huawei) |
S5-109 AI: 6.1 |
noted | [WTS] [JSN] |
375 documents (1.1310150623322 seconds)