Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-164000 | Agenda | agenda | WG Chairman |
S5-108 AI: 2 |
approved | [WTS] [JSN] | |||
S5-164001 | Report from last SA5 meeting | report | ETSI Secretariat |
S5-108 AI: 4.1 |
approved | [WTS] [JSN] | |||
S5-164002 | SA5 status report at last SA meeting | report | WG Chairman |
S5-108 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-164003 | SA5 results at last SA meeting | report | WG Chairman |
S5-108 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-164004 | Time Plan for OAM&P |
other revised to S5-164247 |
WG Vice Chair (Huawei) |
S5-108 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-164005 | OAM Executive Report from THIS Meeting | report | WG Vice Chair (Huawei) |
S5-108 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-164006 | Leaders meeting agenda | agenda | WG Chairman |
S5-108 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-164007 | Leaders meeting minutes | report | WG Chairman |
S5-108 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-164008 | CH Agenda and Time Plan | agenda | CH SWG Chair |
S5-108 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-164009 | CH Executive Report from THIS Meeting | report | CH SWG Chair |
S5-108 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-164010 | SA5 Meeting Calendar | other | WG Vice Chair(Huawei) |
S5-108 AI: 5.4 |
noted | [WTS] [JSN] | |||
S5-164011 | SA5 Working Procedures |
other revised to S5-164179 |
WG Vice Chair (Huawei) |
S5-108 AI: 5.1 |
revised | [WTS] [JSN] | |||
S5-164012 | SA5 Meeting Facility Requirements | other | WG Vice Chair (Huawei) |
S5-108 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-164013 | Process for management of draft TSs/TRs | other | WG Chairman |
S5-108 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-164014 | CR Quality Check | other | ETSI Secretariat |
S5-108 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-164015 | Deliverables due for the NEXT SA Plenary | other | ETSI Secretariat |
S5-108 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-164016 | Ongoing SA5 WIDs and SIDs | other | WG Vice Chair (Huawei) |
S5-108 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-164017 | SA5 3GPP Work Plan | other | ETSI Secretariat |
S5-108 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-164018 | Minutes of New Work Item proposals - OAM&P | report | WG Vice Chair (Orange) |
S5-108 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-164019 | Minutes of OAM&P Maintenance and Rel-14 small Enhancements | report | MCC |
S5-108 AI: 6.3 |
noted | [WTS] [JSN] | |||
S5-164020 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | report | Rapporteur (Huawei) |
S5-108 AI: 6.5.4 |
noted | [WTS] [JSN] | |||
S5-164021 | Minutes for Study on Implementation for the Partitioning of Itf-N | report | Rapporteur(China Mobile) |
S5-108 AI: 6.5.3 |
approved | [WTS] [JSN] | |||
S5-164022 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions | report | Rapporteur(China Mobile) |
S5-108 AI: 6.4.1.1 |
noted | [WTS] [JSN] | |||
S5-164023 | Minutes for Configuration Management for mobile networks that include virtualized network functions | report | Rapporteur(ZTE) |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-164024 | Minutes for Fault Management for mobile networks that include virtualized network functions | report | Rapporteur(Huawei) |
S5-108 AI: 6.4.1.3 |
noted | [WTS] [JSN] | |||
S5-164025 | Minutes for Performance management for mobile networks that include virtualized network functions | report | Rapporteur(Intel) |
S5-108 AI: 6.4.1.4 |
noted | [WTS] [JSN] | |||
S5-164026 | Minutes for Lifecycle management for mobile networks that include virtualized network functions | report | Rapporteur (Nokia Networks) |
S5-108 AI: 6.4.1.5 |
noted | [WTS] [JSN] | |||
S5-164027 | Minutes for Filtering of PM measurements and data volume measurements for shared networks | report | Rapporteur(Ericsson) |
S5-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
S5-164028 | Minutes of Filtering of PM measurements and data volume measurements for shared networks | report | Rapporteur (Ericsson) |
S5-108 AI: 6.5.2 |
withdrawn | [WTS] [JSN] | |||
S5-164029 | Minutes of Study on OAM support for assessment of energy efficiency in mobile access networks | report | Rapporteur (Orange) |
S5-108 AI: 6.5.1 |
withdrawn | [WTS] [JSN] | |||
S5-164030 | Minutes for Study on OAM aspects of SON for AAS-based deployments | report | Rapporteur (Nokia Networks) |
S5-108 AI: 6.5.2 |
noted | [WTS] [JSN] | |||
S5-164031 | Minutes for Study on Management and Orchestration of Network Slicing | report | Rapporteur (Ericsson) |
S5-108 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-164032 | Minutes for Study on management aspects of next generation network architecture and features | report | Rapporteur(Nokia) |
S5-108 AI: 6.5.5 |
noted | [WTS] [JSN] | |||
S5-164033 | IPR and legal declaration | other | WG Chairman |
S5-108 AI: 3 |
noted | [WTS] [JSN] | |||
S5-164034 | Status of email approvals | other | WG Vice Chair (Orange) |
S5-108 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-164035 | Minutes of OAM support for Licensed Shared Access (LSA) | report | Rapporteur (Nokia) |
S5-108 AI: 6.4.3 |
noted | [WTS] [JSN] | |||
S5-164036 | OAM&P SWG action list |
other revised to S5-164303 |
WG Vice Chair (Huawei) |
S5-108 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-164037 | TS 28.510 Add UC NM retrieves VNFs info maintained by mgmt sys |
pCR revised to S5-164176 |
Ericsson Inc. | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164038 | Modify UC Virtualization-specific aspect failure detection and notification by VNFM |
pCR revised to S5-164205 |
Ericsson Inc. | 28.515 0.6.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164039 | Add UC Fetch VNF related VR performance measurements prepared by VNFM |
pCR revised to S5-164214 |
Ericsson Inc. | 28.52 0.6.0 |
S5-108 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-164040 | Reply LS from CT3 cc SA5 on progress of the work on Diameter Load Control | LS in | C3-161313 |
S5-108 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-164041 | LS from CT4 cc SA5 on Recommendations on AVP code allocation | LS in | C4-163248 |
S5-108 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-164042 | LS from CT4 to SA5 on reply on progress of the work on Diameter Base Protocol Update | LS in | C4-163282 |
S5-108 AI: 7.1 |
postponed | [WTS] [JSN] | |||
S5-164043 | LS from CT4 to SA5 on Feasibility Study on the Diameter Base Protocol Update |
LS in LS reply in S5-164094, S5-164094, S5-164180 |
C4-163283 |
S5-108 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-164044 | Liaison reply from ETSI TC EE to 3GPP SA5 about standard ES 202 336-12 (ICT equipment power, energy and environmental parameters monitoring information model) | LS in | ETSI TC EE |
S5-108 AI: 6.5.1 |
postponed | [WTS] [JSN] | |||
S5-164045 | Resubmitted LS from ETSI TC INT to SA5 on Validation project for the Conformance Test Specifications for the Diameter Protocol over the Rf and the Ro reference points | LS in | ETSI TC INT |
S5-108 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-164046 | LS from ETSI TC NTECH to SA5 on Autonomic Networking applied to 3GPP Core and Backhaul parts | LS in | ETSI TC NTECH |
S5-108 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-164047 | Liaison Statement to 3GPP SA2 and 3GPP SA5 from ETSI NTECH |
LS in LS reply in S5-164167, S5-164167 |
ETSI TC NTECH |
S5-108 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-164048 | Minutes of OAM&P SWG opening session | report | WG Chairman |
S5-108 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-164049 | Rel-13 CR 28663 Correction in XML code | CR | MCC | 28.663 13.1.0 CR#14 catF | OAM13 | Rel-13 |
S5-108 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-164050 | Rel-13 CR 28.656 Correct the link from IRP Solution Set to IRP Information Service | CR | Ericsson | 28.656 13.2.0 CR#16 catF | OAM13 | Rel-13 |
S5-108 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-164051 | pCR to TR 28.520 Use Case for PM data collection |
pCR revised to S5-164215 |
Cisco Systems Inc. | 28.52 0.6.0 |
S5-108 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-164052 | pCR to TS 28.525 Delete VNF Package operation |
pCR revised to S5-164230 |
Cisco Systems Inc. | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164053 | pCR to TS 28.525 Query VNF Package operation | pCR | Cisco Systems Inc. | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
noted | [WTS] [JSN] | ||
S5-164054 | pCR to TS 28.525 Subscribe VNF Package operation |
pCR revised to S5-164231 |
Cisco Systems Inc. | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164055 | pCR to TS 28.525 Use Case on Notify operation on VNF package management interface | pCR | Cisco Systems Inc. | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164056 | pCR to TS 28.525 Fetch VNF Package operation |
pCR revised to S5-164232 |
Cisco Systems Inc. | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164057 | pCR to TR 32.865 Cell splitting merging |
pCR revised to S5-164248 |
Cisco Systems Inc. | 32.865 0.4.0 |
S5-108 AI: 6.5.2 |
revised | [WTS] [JSN] | ||
S5-164058 | pCR to TR 32.865 Geo information from OAM | pCR | Cisco Systems Inc. | 32.865 0.4.0 |
S5-108 AI: 6.5.2 |
noted | [WTS] [JSN] | ||
S5-164059 | Discussion of network slicing and ETSI NFV Network Service relationship | discussion | Cisco Systems Belgium |
S5-108 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-164060 | Skeleton TR 28.801 Management and Orchestration of Network Slicing | draft TR | Ericsson | Rel-14 |
S5-108 AI: 6.5.6 |
approved | [WTS] [JSN] | ||
S5-164061 | pCR TR 28.801 Introduction and Scope for Management and Orchestration of Network Slicing |
other revised to S5-164255 |
Ericsson | Rel-14 |
S5-108 AI: 6.5.6 |
revised | [WTS] [JSN] | ||
S5-164062 | Draft TS 28.522 skeleton |
draft TS revised to S5-164216 |
Intel Corporation (UK) Ltd | Rel-14 |
S5-108 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-164063 | pCR TS 28.522 add introduction and scope | pCR | Intel Corporation (UK) Ltd | 28.522 0.1.0 |
S5-108 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-164064 | pCR TS 28.520 correct VNF PM data related to VR terminology |
pCR revised to S5-164217 |
Intel Corporation (UK) Ltd | 28.52 0.6.0 |
S5-108 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-164065 | pCR TS 28.520 add reference to ETSI GS NFV IFA008 specification | pCR | Intel Corporation (UK) Ltd | 28.52 0.6.0 |
S5-108 AI: 6.4.1.4 |
noted | [WTS] [JSN] | ||
S5-164066 | pCR TS 28.521 add VR PM data available notification procedure |
pCR revised to S5-164219 |
Intel Corporation (UK) Ltd | 28.521 0.3.0 |
S5-108 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-164067 | Skeleton of draft TR 28.802 Management aspects of 5G network architecture and features |
draft TR revised to S5-164253 |
Nokia Networks | Rel-14 |
S5-108 AI: 6.5.5 |
revised | [WTS] [JSN] | ||
S5-164068 | pCR Add scope to draft TR 28.802 |
pCR revised to S5-164254 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.1.0 |
S5-108 AI: 6.5.5 |
revised | [WTS] [JSN] | ||
S5-164069 | Draft TS 28.512 skeleton |
draft TS revised to S5-164177 |
ZTE Corporation | Rel-14 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164070 | pCR TS 28.512 Add introduction and scope | pCR | ZTE Corporation | 28.512 0.1.0 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164071 | pCR TS 28.512 Add description of Itf-N operation | pCR | ZTE Corporation | 28.512 0.1.0 |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-164072 | pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated | pCR | ZTE Corporation | 28.511 0.4.0 |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-164073 | pCR draft TS 28.511 Add procedure of deleting MOI(s) corresponding to a VNF instance | pCR | ZTE Corporation | 28.511 0.4.0 |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-164074 | Rel-14 CR 32.240 Add charging principles for roaming architecture for voice over IMS with home routed traffic |
CR revised to S5-164184 |
China Mobile Com. Corporation | 32.24 14.0.0 CR#388 catB | CH14 | Rel-14 |
S5-108 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-164075 | pCR TS 28.515 Remove notes | pCR | Huawei Tech.(UK) Co., Ltd | 28.515 0.6.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164076 | pCR TS 28.515 Rapporteur changes |
pCR revised to S5-164207 |
Huawei Tech.(UK) Co., Ltd | 28.515 0.6.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164077 | pCR TS 28.516 Modification of procedures of NE alarm correlation in the context of NFV |
pCR revised to S5-164208 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164078 | pCR TS 28.516 Modification of procedures of virtualization-specific aspect failure detection and notification |
pCR revised to S5-164209 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164079 | pCR TS 28.516 Modification of procedure of virtualization-specific aspect healing through operation request to VNFM by EM |
pCR revised to S5-164210 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164080 | pCR TS 28.516 Adding alarm data flow |
pCR revised to S5-164211 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164081 | pCR TS 28.516 Rapporteur changes |
pCR revised to S5-164212 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164082 | pCR TS 28.517 Adding VNF alarm reporting stage 2 description on Ve-Vnfm-em | pCR | Huawei Tech.(UK) Co., Ltd | 28.517 0.2.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164083 | pCR TS 28.517 Adding general descriptions |
pCR revised to S5-164213 |
Huawei Tech.(UK) Co., Ltd | 28.517 0.2.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164084 | pCR TS 28.517 Adding Information Model for Itf-N | pCR | Huawei Tech.(UK) Co., Ltd | 28.517 0.2.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164085 | Draft TS 28.518 Skeleton proposal | draft TS | Huawei Tech.(UK) Co., Ltd | Rel-14 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164086 | pCR TS 28.518 Adding content for introduction and scope | pCR | Huawei Tech.(UK) Co., Ltd | 28.518 0.1.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164087 | pCR TS 28.525 Adding UC of VNF application software update when application software is not part of VNF Package |
pCR revised to S5-164233 |
Huawei Tech.(UK) Co., Ltd | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164088 | pCR TS 28.500 Add business level use case of NE deployment in the context of NFV |
pCR revised to S5-164169 |
Huawei Tech.(UK) Co., Ltd | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164089 | Correlation of MO creation and VNF instantiation |
discussion revised to S5-164178 |
Huawei Tech.(UK) Co., Ltd |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-164090 | pCR TS 28.511 Adding procedure flow for VNF instantiation triggered by MO creation | pCR | Huawei Tech.(UK) Co., Ltd | 28.511 0.4.0 |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-164091 | pCR TR 32.865 Add solutions for OAM aspects of SON for AAS |
pCR revised to S5-164249 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.865 0.4.0 |
S5-108 AI: 6.5.2 |
revised | [WTS] [JSN] | ||
S5-164092 | pCR TS 28.500 Adding business UC and reqs on querying and modification of non-application VNF instance information |
pCR revised to S5-164171 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164093 | pCR TS 28.510 Adding specification UC and reqs on modification of VNF instance non-applicatoin configuration through NFVO as part of NS update |
pCR revised to S5-164203 |
NTT DOCOMO | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164094 | LS reply to LS on Feasibility Study on the Diameter Base Protocol Update |
LS out LS is reply to S5-164043 source LS: S5-164043 LS To: CT4 revised to S5-164180 |
Nokia |
S5-108 AI: 7.1 |
revised | [WTS] [JSN] | |||
S5-164095 | pCR TS 28.500 Clarifications on the description of NM and reference points in the Management Architecture |
pCR revised to S5-164172 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164096 | pCR TS 28.500 General fixes to terminology used in requirements and adding some references |
pCR revised to S5-164173 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164097 | pCR TS 28.500 Adding business UC and reqs on keeping updated an NS instance |
pCR revised to S5-164174 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164098 | pCR TS 28.515 Adressing Note on recovering virtualization-specific aspect in healing context |
pCR revised to S5-164206 |
NTT DOCOMO | 28.515 0.6.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164099 | pCR TS 28.525 Adding functional requirement related to VNF application software update clause 5.4.4.3.1 |
pCR revised to S5-164234 |
NTT DOCOMO | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164100 | pCR TS 28.525 Adding specification UCs and requirements related to updating NS | pCR | NTT DOCOMO | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
noted | [WTS] [JSN] | ||
S5-164101 | LS on Addition of AVP code definitions |
LS out LS To: CT4 revised to S5-164221 |
Nokia |
S5-108 AI: 7.1 |
revised | [WTS] [JSN] | |||
S5-164102 | Rel-12 CR 32.298 Correction on the SubscriberEquipmentType – align with TS 32.299 | CR | China Mobile Com. Corporation | 32.298 12.11.0 CR#591 catF | CH12 | Rel-12 |
S5-108 AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-164103 | Rel-13 CR 32.298 Correction on the SubscriberEquipmentType – align with TS 32.299 |
CR revised to S5-164185 |
China Mobile Com. Corporation | 32.298 13.4.0 CR#592 catA | CH12 | Rel-13 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164104 | Draft TR 28.800 skeleton proposal |
draft TR revised to S5-164251 |
Huawei | Rel-14 |
S5-108 AI: 6.5.4 |
revised | [WTS] [JSN] | ||
S5-164105 | pCR TR 28.800 Adding content for introduction and scope |
pCR revised to S5-164252 |
Huawei | 28.8 0.1.0 |
S5-108 AI: 6.5.4 |
revised | [WTS] [JSN] | ||
S5-164106 | Discussion paper on the management and orchestration terminologies | discussion | Huawei |
S5-108 AI: 6.5.4 |
noted | [WTS] [JSN] | |||
S5-164107 | LS from ATIS to SA5 on Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network | LS in | Alliance for Telecommunications Industry Solutions (ATIS) |
S5-108 AI: 6.1 |
postponed | [WTS] [JSN] | |||
S5-164108 | pCR TR 28.800 Adding deployment scenarios of the next generation management system | pCR | Huawei | 28.8 0.1.0 |
S5-108 AI: 6.5.4 |
noted | [WTS] [JSN] | ||
S5-164109 | pCR TR 28.801 Adding full isolated slices management use case |
other revised to S5-164256 |
Huawei |
S5-108 AI: 6.5.6 |
revised | [WTS] [JSN] | |||
S5-164110 | pCR TR 28.801 Adding use case for management supoort of network slice resource isolation | other | Huawei |
S5-108 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-164111 | pCR TR 28.801 Adding management use case of Network Slices with Common and Slice Specific Functions |
other revised to S5-164257 |
Huawei |
S5-108 AI: 6.5.6 |
revised | [WTS] [JSN] | |||
S5-164112 | pCR TR 28.801 Adding use case for network slice lifecycle management |
other revised to S5-164258 |
Huawei |
S5-108 AI: 6.5.6 |
revised | [WTS] [JSN] | |||
S5-164113 | pCR TR 32.817 Measurement definitions and PM IRP additions |
pCR revised to S5-164238 |
Ericsson | 32.817 0.3.0 | OAM14-FILMEAS |
S5-108 AI: 6.4.2 |
revised | [WTS] [JSN] | |
S5-164114 | pCR TS 28.525 Add requirements for NS instance lifecycle change notification |
pCR revised to S5-164235 |
ETRI | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164115 | pCR TS 28.525 Use case for NS querying and NS instance termination |
pCR revised to S5-164116 |
ETRI | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164116 | pCR TS 28.525 Use case for NS querying and NS instance termination |
pCR revision of S5-164115 revised to S5-164236 |
ETRI | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164117 | Discussin paper on usage of imported information entities | discussion | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 |
S5-108 AI: 6.3 |
noted | [WTS] [JSN] | ||
S5-164118 | pCR to draft CR 32.157 Add associated informaiton entities to the IS template |
draftCR revised to S5-164201 |
Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 |
S5-108 AI: 6.3 |
revised | [WTS] [JSN] | ||
S5-164119 | Discussion paper - clarification on NM confirmation | discussion | RED Technologies SAS | Rel-14 |
S5-108 AI: 6.4.3 |
noted | [WTS] [JSN] | ||
S5-164120 | pCR TS 28 xxx New business level use case - LSA spectrum resource availability change |
other revised to S5-164241 |
RED Technologies SAS | Rel-14 |
S5-108 AI: 6.4.3 |
revised | [WTS] [JSN] | ||
S5-164121 | pCR TS 28 xxx New business level use case - LC Initialization |
other revised to S5-164242 |
RED Technologies SAS | Rel-14 |
S5-108 AI: 6.4.3 |
revised | [WTS] [JSN] | ||
S5-164122 | pCR TS 28 xxx New business level use case - Network deployment update |
other revised to S5-164243 |
RED Technologies SAS | Rel-14 |
S5-108 AI: 6.4.3 |
revised | [WTS] [JSN] | ||
S5-164123 | pCR TS 28 xxx New business level use case - Loss of connectivity with the LR |
other revised to S5-164244 |
RED Technologies SAS |
S5-108 AI: 6.4.3 |
revised | [WTS] [JSN] | |||
S5-164124 | pCR TR 28 xxx Definition of interfaces |
other revised to S5-164245 |
RED Technologies SAS | Rel-14 |
S5-108 AI: 6.4.3 |
revised | [WTS] [JSN] | ||
S5-164125 | pCR TS 28.500 Adding policy management requirements | other | China Mobile Com. Corporation | Rel-14 |
S5-108 AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] | ||
S5-164126 | pCR TR 28.801 Adding use case for supporting dynamic Lifecycle Management in Network Slices | other | Huawei Tech.(UK) Co., Ltd |
S5-108 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-164127 | pCR TS 28.500 Adding policy management requirements |
pCR revised to S5-164175 |
China Mobile Com. Corporation | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164128 | pCR TS 28.500 Adding CM requirements |
pCR revised to S5-164170 |
China Mobile Com. Corporation | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164129 | pCR TS 28.500 Adding retrieving information requirements | pCR | China Mobile Com. Corporation | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
merged | [WTS] [JSN] | ||
S5-164130 | Rel-13 CR 32.299 Correction on APN Rate Control – Alignment with TS 23.401 |
CR revised to S5-164188 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#735 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164131 | pCR TS 28.525 add VNF identifier creation use case and requirements |
pCR revised to S5-164237 |
Intel Corporation (UK) Ltd | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164132 | pCR TS 28.526 add VNF instantiation procedures |
pCR revised to S5-164239 |
Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164133 | pCR TS 28.526 add VNF termination procedure | pCR | Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
noted | [WTS] [JSN] | ||
S5-164134 | pCR TS 28.526 add VNF scaling procedures |
pCR revised to S5-164240 |
Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164135 | NEW SID Study on management of the virtualized RAN |
SID new revised to S5-164168 |
Intel Corporation (UK) Ltd | Rel-14 |
S5-108 AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-164136 | Rel-13 CR 32.298 Correction on APN Rate Control – Alignment with TS 23.401 |
CR revised to S5-164190 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#593 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164137 | pCR TR 32.880 overview of solution sets for Itf-N |
pCR revised to S5-164250 |
China Mobile | 32.88 0.3.0 |
S5-108 AI: 6.5.3 |
revised | [WTS] [JSN] | ||
S5-164138 | Relation between create MO and instantiate VNF operations | other | Ericsson Inc. | Rel-14 |
S5-108 AI: 6.4.1.2 |
merged | [WTS] [JSN] | ||
S5-164139 | UCs (on VNF/VNFC realization) requiring NRM support |
other revised to S5-164204 |
Ericsson Inc. | Rel-14 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164140 | Discussion Paper for Complement of Charging per IP-CAN Session Analysis | discussion | Huawei Technologies |
S5-108 AI: 7.3 |
noted | [WTS] [JSN] | |||
S5-164141 | Complement of Charging per IP-CAN Session |
CR revised to S5-164197 |
Huawei Technologies | 32.251 13.5.0 CR#473 catB | CH14 | Rel-14 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164142 | Complement of Charging per IP-CAN Session |
CR revised to S5-164198 |
Huawei Technologies | 32.299 14.0.0 CR#736 catB | CH14 | Rel-14 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164143 | Complement of Charging per IP-CAN Session |
CR revised to S5-164199 |
Huawei Technologies | 32.298 13.4.0 CR#594 catB | CH14 | Rel-14 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164144 | Add Editor's Notes for ProSe Charging | CR | Huawei Technologies | 32.277 13.0.0 CR#13 catB | CH14-ProSe | Rel-14 |
S5-108 AI: 7.4.3 |
withdrawn | [WTS] [JSN] |
S5-164145 | Message flow for Announce Request of Prose Restricted Discovery |
CR revised to S5-164183 |
Huawei Technologies | 32.277 13.0.0 CR#14 catB | CH14-ProSe | Rel-14 |
S5-108 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-164146 | General description for Gy Session Optimization | CR | Huawei Technologies | 32.251 13.5.0 CR#474 catB | CH14-ROPOCH | Rel-14 |
S5-108 AI: 7.4.1 |
not pursued | [WTS] [JSN] |
S5-164147 | LS from SA4 cc SA5 on QoE reporting for streaming services | LS in | S4-160866 |
S5-108 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-164148 | Correction of reference to Annex B of TS 32.260 |
CR revised to S5-164186 |
Ericsson | 32.281 13.0.0 CR#2 catF | ANIMO | Rel-13 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164149 | Use of Multiple Operation and Multiple Unit Operation for IEC |
CR revised to S5-164187 |
Ericsson | 32.274 13.0.0 CR#32 catF | CH13 | Rel-13 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164150 | Use of Credit Control Not Applicable for Gy Session Optimization |
other revised to S5-164182 |
Ericsson | CH14-ROPOCH | Rel-14 |
S5-108 AI: 7.4.1 |
revised | [WTS] [JSN] | |
S5-164151 | Rel-13 CR 32.253 Correction of trigger conditions description for NIDD submission |
CR revised to S5-164191 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.253 13.0.0 CR#1 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164152 | Rel-13 CR 32.298 Correction of trigger conditions description for NIDD submission |
CR revised to S5-164192 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#595 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164153 | Rel-13 CR 32.299 Correction of trigger conditions description for NIDD submission |
CR revised to S5-164193 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#737 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164154 | Rel-13 CR 32.299 Correction on AVP Code for Serving PLMN Rate Control – alignement with 29.230 |
CR revised to S5-164195 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#738 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164155 | Rel-14 CR 32.299 Introduction of allocated AVPs code ranges-alignement with 29.230 |
CR revised to S5-164220 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#739 catD | CH14 | Rel-14 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164156 | Rel-14 CR 32.299 Correction of trigger conditions description for NIDD submission |
CR revised to S5-164194 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#740 catA | CIoT-CH | Rel-14 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164157 | Rel-14 CR 32.299 Correction on AVP Code for Serving PLMN Rate Control- alignement with 29.230 |
CR revised to S5-164196 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#741 catA | CIoT-CH | Rel-14 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164158 | Rel-14 CR 32.299 Correction on APN Rate Control - Alignment with TS 23.401 |
CR revised to S5-164189 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#742 catA | CIoT-CH | Rel-14 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164159 | LS from SA to SA5 on I-WLAN handling and specification withdrawal | LS in | SP-160508 |
S5-108 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-164160 | Liaison from ETSI TC EE to 3GPP SA5 in response to S5-162239 | LS in | ETSI TC EE |
S5-108 AI: 6.5.1 |
postponed | [WTS] [JSN] | |||
S5-164161 | pCR 28.xxx Add business and specification level requirements incl. use cases |
other revised to S5-164246 |
Nokia Networks | Rel-14 |
S5-108 AI: 6.4.3 |
revised | [WTS] [JSN] | ||
S5-164162 | Report of methodology coordination meeting with ITU-T SG2 | report | Ericsson LM |
S5-108 AI: 4.3 |
noted | [WTS] [JSN] | |||
S5-164163 | Requirements template (high-level) example | other | Ericsson LM |
S5-108 AI: 5.1 |
agreed | [WTS] [JSN] | |||
S5-164164 | Requirements template (simplified) example | other | Ericsson LM |
S5-108 AI: 5.1 |
agreed | [WTS] [JSN] | |||
S5-164165 | ETSI NTECH LS TR presentation | other | Ericsson LM |
S5-108 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-164166 | Discussion sequence proposal | discussion | ZTE |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-164167 | Reply to: Liaison Statement to 3GPP SA2 and 3GPP SA5 from ETSI NTECH |
LS out LS is reply to S5-164047 LS To: ETSI TC NTECH |
Huawei |
S5-108 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-164168 | NEW SID Study on management of the virtualized RAN |
SID new revision of S5-164135 |
Intel Corporation (UK) Ltd | Rel-14 |
S5-108 AI: 6.2 |
postponed | [WTS] [JSN] | ||
S5-164169 | pCR TS 28.500 Add business level use case of NE deployment in the context of NFV |
pCR revision of S5-164088 revised to S5-164227 |
Huawei Tech.(UK) Co., Ltd | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164170 | pCR TS 28.500 Adding CM requirements |
pCR revision of S5-164128 revised to S5-164260 |
China Mobile Com. Corporation | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164171 | pCR TS 28.500 Adding business UC and reqs on querying and modification of non-application VNF instance information |
pCR revision of S5-164092 |
NTT DOCOMO, China Mobile | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-164172 | pCR TS 28.500 Clarifications on the description of NM and reference points in the Management Architecture |
pCR revision of S5-164095 revised to S5-164228 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164173 | pCR TS 28.500 General fixes to terminology used in requirements and adding some references |
pCR revision of S5-164096 revised to S5-164229 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164174 | pCR TS 28.500 Adding business UC and reqs on keeping updated an NS instance |
pCR revision of S5-164097 revised to S5-164259 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-164175 | pCR TS 28.500 Adding policy management requirements |
pCR revision of S5-164127 |
China Mobile Com. Corporation | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
noted | [WTS] [JSN] | ||
S5-164176 | TS 28.510 Add UC NM retrieves VNFs info maintained by mgmt sys |
pCR revision of S5-164037 revised to S5-164261 |
Ericsson Inc. | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164177 | Draft TS 28.512 skeleton |
draft TS revision of S5-164069 |
ZTE Corporation | Rel-14 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164178 | Correlation of MO creation and VNF instantiation |
discussion revision of S5-164089 revised to S5-164202 |
Huawei Tech.(UK) Co., Ltd |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-164179 | SA5 Working Procedures |
other revision of S5-164011 revised to S5-164200 |
WG Vice Chair (Huawei) |
S5-108 AI: 5.1 |
revised | [WTS] [JSN] | |||
S5-164180 | LS reply to LS on Feasibility Study on the Diameter Base Protocol Update |
LS out LS is reply to S5-164043 source LS: S5-164043 LS To: CT4 revision of S5-164094 |
Nokia |
S5-108 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-164181 | Rel-14 dCR 32.251 General description for Gy Session Optimization | draftCR | Huawei Technologies | CH14-ROPOCH | Rel-13 |
S5-108 AI: 7.4.1 |
approved | [WTS] [JSN] | |
S5-164182 | Use of Credit Control Not Applicable for Gy Session Optimization |
other revision of S5-164150 |
Ericsson | CH14-ROPOCH | Rel-14 |
S5-108 AI: 7.4.1 |
approved | [WTS] [JSN] | |
S5-164183 | Rel-14 CR 32.277 Message flow for Announce Request of Prose Restricted Discovery |
CR revision of S5-164145 |
Huawei Technologies | 32.277 13.0.0 CR#141 catB | CH14-ProSe | Rel-14 |
S5-108 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-164184 | Rel-14 CR 32.240 Add charging principles for roaming architecture for voice over IMS with home routed traffic |
CR revision of S5-164074 |
China Mobile Com. Corporation | 32.24 14.0.0 CR#3881 catB | CH14 | Rel-14 |
S5-108 AI: 7.4.4 |
agreed | [WTS] [JSN] |
S5-164185 | Rel-14 CR 32.298 Correction on the SubscriberEquipmentType – align with TS 32.299 |
CR revision of S5-164103 |
China Mobile Com. Corporation | 32.298 13.4.0 CR#5921 catF | CH14 | Rel-14 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164186 | Rel-14 CR 32.281 Correction of reference to Annex B of TS 32.260 |
CR revision of S5-164148 revised to S5-164302 |
Ericsson | 32.281 13.0.0 CR#21 catF | CH14, ANIMO | Rel-14 |
S5-108 AI: 7.3 |
revised | [WTS] [JSN] |
S5-164187 | Rel-13 CR 32.274 Correction on use of Multiple Operation and Multiple Unit Operation for IEC |
CR revision of S5-164149 |
Ericsson | 32.274 13.0.0 CR#321 catF | CH13 | Rel-13 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164188 | Rel-13 CR 32.299 Correction on APN Rate Control – Alignment with TS 23.401 |
CR revision of S5-164130 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#7351 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164189 | Rel-14 CR 32.299 Correction on APN Rate Control - Alignment with TS 23.401 |
CR revision of S5-164158 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#7421 catA | CIoT-CH | Rel-14 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164190 | Rel-13 CR 32.298 Correction on APN Rate Control – Alignment with TS 23.401 |
CR revision of S5-164136 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#5931 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164191 | Rel-13 CR 32.253 Correction of trigger conditions description for NIDD submission |
CR revision of S5-164151 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.253 13.0.0 CR#11 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164192 | Rel-13 CR 32.298 Correction of trigger conditions description for NIDD submission |
CR revision of S5-164152 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 13.4.0 CR#5951 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164193 | Rel-13 CR 32.299 Correction of trigger conditions description for NIDD submission |
CR revision of S5-164153 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#7371 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164194 | Rel-14 CR 32.299 Correction of trigger conditions description for NIDD submission |
CR revision of S5-164156 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#7401 catA | CIoT-CH | Rel-14 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164195 | Rel-13 CR 32.299 Correction on AVP Code for Serving PLMN Rate Control – alignement with 29.230 |
CR revision of S5-164154 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 13.5.0 CR#7381 catF | CIoT-CH | Rel-13 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164196 | Rel-14 CR 32.299 Correction on AVP Code for Serving PLMN Rate Control- alignement with 29.230 |
CR revision of S5-164157 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#7411 catA | CIoT-CH | Rel-14 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164197 | Rel-14 CR 32.251 Complement of Charging per IP-CAN Session |
CR revision of S5-164141 |
Huawei Technologies | 32.251 13.5.0 CR#4731 catB | CH14 | Rel-14 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164198 | Rel-14 CR 32.299 Complement of Charging per IP-CAN Session |
CR revision of S5-164142 |
Huawei Technologies | 32.299 14.0.0 CR#7361 catB | CH14 | Rel-14 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164199 | Rel-14 CR 32.298 Complement of Charging per IP-CAN Session |
CR revision of S5-164143 |
Huawei Technologies | 32.298 13.4.0 CR#5941 catB | CH14 | Rel-14 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164200 | SA5 Working Procedures |
other revision of S5-164179 |
WG Vice Chair (Huawei) |
S5-108 AI: 5.1 |
approved | [WTS] [JSN] | |||
S5-164201 | pCR to draft CR 32.157 Add associated informaiton entities to the IS template |
draftCR revision of S5-164118 |
Nokia, Alcatel-Lucent Shanghai Bell | Rel-13 |
S5-108 AI: 6.3 |
approved | [WTS] [JSN] | ||
S5-164202 | Correlation of MO creation and VNF instantiation |
discussion revision of S5-164178 revised to S5-164223 |
Huawei Tech.(UK) Co., Ltd |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-164203 | pCR TS 28.510 Adding specification UC and reqs on modification of VNF instance non-applicatoin configuration through NFVO as part of NS update |
pCR revision of S5-164093 revised to S5-164263 |
NTT DOCOMO | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164204 | UCs (on VNF/VNFC realization) requiring NRM support |
other revision of S5-164139 revised to S5-164264 |
Ericsson Inc. | Rel-14 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164205 | Modify UC Virtualization-specific aspect failure detection and notification by VNFM |
pCR revision of S5-164038 revised to S5-164269 |
Ericsson Inc. | 28.515 0.6.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164206 | pCR TS 28.515 Adressing Note on recovering virtualization-specific aspect in healing context |
pCR revision of S5-164098 |
NTT DOCOMO | 28.515 0.6.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164207 | pCR TS 28.515 Rapporteur changes |
pCR revision of S5-164076 |
Huawei Tech.(UK) Co., Ltd | 28.515 0.6.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164208 | pCR TS 28.516 Modification of procedures of NE alarm correlation in the context of NFV |
pCR revision of S5-164077 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164209 | pCR TS 28.516 Modification of procedures of virtualization-specific aspect failure detection and notification |
pCR revision of S5-164078 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164210 | pCR TS 28.516 Modification of procedure of virtualization-specific aspect healing through operation request to VNFM by EM |
pCR revision of S5-164079 revised to S5-164270 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
revised | [WTS] [JSN] | ||
S5-164211 | pCR TS 28.516 Adding alarm data flow |
pCR revision of S5-164080 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164212 | pCR TS 28.516 Rapporteur changes |
pCR revision of S5-164081 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164213 | pCR TS 28.517 Adding general descriptions |
pCR revision of S5-164083 |
Huawei Tech.(UK) Co., Ltd | 28.517 0.2.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164214 | Add UC Fetch VNF related VR performance measurements prepared by VNFM |
pCR revision of S5-164039 revised to S5-164274 |
Ericsson Inc. | 28.52 0.6.0 |
S5-108 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-164215 | pCR to TR 28.520 Use Case for PM data collection |
pCR revision of S5-164051 |
Cisco Systems Inc. | 28.52 0.6.0 |
S5-108 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-164216 | Draft TS 28.522 skeleton |
draft TS revision of S5-164062 |
Intel Corporation (UK) Ltd | Rel-14 |
S5-108 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-164217 | pCR TS 28.520 correct VNF PM data related to VR terminology |
pCR revision of S5-164064 |
Intel Corporation (UK) Ltd | 28.52 0.6.0 |
S5-108 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-164218 | pCR TS 28.520 add reference to ETSI GS NFV IFA008 specification | pCR | Intel Corporation (UK) Ltd | 28.52 0.6.0 |
S5-108 AI: 6.4.1.4 |
withdrawn | [WTS] [JSN] | ||
S5-164219 | pCR TS 28.521 add VR PM data available notification procedure |
pCR revision of S5-164066 revised to S5-164277 |
Intel Corporation (UK) Ltd | 28.521 0.3.0 |
S5-108 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-164220 | Rel-14 CR 32.299 Introduction of allocated AVPs code ranges-alignement with 29.230 |
CR revision of S5-164155 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.299 14.0.0 CR#7391 catF | CH14 | Rel-14 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164221 | LS on Addition of AVP code definitions |
LS out LS To: CT4 revision of S5-164101 revised to S5-164301 |
Nokia |
S5-108 AI: 7.1 |
revised | [WTS] [JSN] | |||
S5-164222 | General description for Gy Session Optimization | other | Huawei |
S5-108 AI: 7.4.1 |
approved | [WTS] [JSN] | |||
S5-164223 | Potential use cases for relationship between MO creation and VNF instantiation |
pCR revision of S5-164202 revised to S5-164262 |
Huawei Tech.(UK) Co., Ltd,Ericsson,Nokia | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164224 | LS to RAN3 on management of VRAN |
LS out revised to S5-164305 |
Intel |
S5-108 AI: 6.2 |
revised | [WTS] [JSN] | |||
S5-164225 | NEW SID Study on management of the virtualized RAN | SID new | Intel Corporation (UK) Ltd | Rel-14 |
S5-108 AI: 6.2 |
withdrawn | [WTS] [JSN] | ||
S5-164226 | Draft CR 32.157 | draftCR | Ericsson | Rel-13 |
S5-108 AI: 6.3 |
approved | [WTS] [JSN] | ||
S5-164227 | pCR TS 28.500 Add business level use case of NE deployment in the context of NFV |
pCR revision of S5-164169 |
Huawei Tech.(UK) Co., Ltd | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-164228 | pCR TS 28.500 Clarifications on the description of NM and reference points in the Management Architecture |
pCR revision of S5-164172 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-164229 | pCR TS 28.500 General fixes to terminology used in requirements and adding some references |
pCR revision of S5-164173 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-164230 | pCR to TS 28.525 Delete VNF Package operation |
pCR revision of S5-164052 |
Cisco Systems Inc. | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164231 | pCR to TS 28.525 Subscribe VNF Package operation |
pCR revision of S5-164054 |
Cisco Systems Inc. | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164232 | pCR to TS 28.525 Fetch VNF Package operation |
pCR revision of S5-164056 |
Cisco Systems Inc. | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164233 | pCR TS 28.525 Adding UC of VNF application software update when application software is not part of VNF Package |
pCR revision of S5-164087 |
Huawei Tech.(UK) Co., Ltd | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164234 | pCR TS 28.525 Adding functional requirement related to VNF application software update clause 5.4.4.3.1 |
pCR revision of S5-164099 |
NTT DOCOMO | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164235 | pCR TS 28.525 Add requirements for NS instance lifecycle change notification |
pCR revision of S5-164114 revised to S5-164279 |
ETRI | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164236 | pCR TS 28.525 Use case for NS querying and NS instance termination |
pCR revision of S5-164116 revised to S5-164280 |
ETRI | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164237 | pCR TS 28.525 add VNF identifier creation use case and requirements |
pCR revision of S5-164131 revised to S5-164281 |
Intel Corporation (UK) Ltd | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164238 | pCR TR 32.817 Measurement definitions and PM IRP additions |
pCR revision of S5-164113 |
Ericsson | 32.817 0.3.0 | OAM14-FILMEAS |
S5-108 AI: 6.4.2 |
approved | [WTS] [JSN] | |
S5-164239 | pCR TS 28.526 add VNF instantiation procedures |
pCR revision of S5-164132 revised to S5-164282 |
Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164240 | pCR TS 28.526 add VNF scaling procedures |
pCR revision of S5-164134 revised to S5-164283 |
Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164241 | pCR TS 28 xxx New business level use case - LSA spectrum resource availability change |
other revision of S5-164120 |
RED Technologies SAS | Rel-14 |
S5-108 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-164242 | pCR TS 28 xxx New business level use case - LC Initialization |
other revision of S5-164121 |
RED Technologies SAS | Rel-14 |
S5-108 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-164243 | pCR TS 28 xxx New business level use case - Network deployment update |
other revision of S5-164122 |
RED Technologies SAS | Rel-14 |
S5-108 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-164244 | pCR TS 28 xxx New business level use case - Loss of connectivity with the LR |
other revision of S5-164123 |
RED Technologies SAS |
S5-108 AI: 6.4.3 |
approved | [WTS] [JSN] | |||
S5-164245 | pCR TR 28 xxx Definition of interfaces |
other revision of S5-164124 |
RED Technologies SAS | Rel-14 |
S5-108 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-164246 | pCR 28.xxx Add business and specification level requirements incl. use cases |
other revision of S5-164161 |
Nokia Networks | Rel-14 |
S5-108 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-164247 | Time Plan for OAM&P |
other revision of S5-164004 |
WG Vice Chair (Huawei) |
S5-108 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-164248 | pCR to TR 32.865 Cell splitting merging |
pCR revision of S5-164057 |
Cisco Systems Inc. | 32.865 0.4.0 |
S5-108 AI: 6.5.2 |
approved | [WTS] [JSN] | ||
S5-164249 | pCR TR 32.865 Add solutions for OAM aspects of SON for AAS |
pCR revision of S5-164091 revised to S5-164288 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.865 0.4.0 |
S5-108 AI: 6.5.2 |
revised | [WTS] [JSN] | ||
S5-164250 | pCR TR 32.880 overview of solution sets for Itf-N |
pCR revision of S5-164137 |
China Mobile | 32.88 0.3.0 |
S5-108 AI: 6.5.3 |
approved | [WTS] [JSN] | ||
S5-164251 | Draft TR 28.800 skeleton proposal |
draft TR revision of S5-164104 |
Huawei | Rel-14 |
S5-108 AI: 6.5.4 |
approved | [WTS] [JSN] | ||
S5-164252 | pCR TR 28.800 Adding content for introduction and scope |
pCR revision of S5-164105 |
Huawei | 28.8 0.1.0 |
S5-108 AI: 6.5.4 |
approved | [WTS] [JSN] | ||
S5-164253 | Skeleton of draft TR 28.802 Management aspects of 5G network architecture and features |
draft TR revision of S5-164067 |
Nokia Networks | Rel-14 |
S5-108 AI: 6.5.5 |
approved | [WTS] [JSN] | ||
S5-164254 | pCR Add scope to draft TR 28.802 |
pCR revision of S5-164068 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.1.0 |
S5-108 AI: 6.5.5 |
approved | [WTS] [JSN] | ||
S5-164255 | pCR TR 28.801 Introduction and Scope for Management and Orchestration of Network Slicing |
other revision of S5-164061 |
Ericsson | Rel-14 |
S5-108 AI: 6.5.6 |
approved | [WTS] [JSN] | ||
S5-164256 | pCR TR 28.801 Adding full isolated slices management use case |
other revision of S5-164109 revised to S5-164292 |
Huawei |
S5-108 AI: 6.5.6 |
revised | [WTS] [JSN] | |||
S5-164257 | pCR TR 28.801 Adding management use case of Network Slices with Common and Slice Specific Functions |
other revision of S5-164111 |
Huawei |
S5-108 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-164258 | pCR TR 28.801 Adding use case for network slice lifecycle management |
other revision of S5-164112 revised to S5-164293 |
Huawei |
S5-108 AI: 6.5.6 |
revised | [WTS] [JSN] | |||
S5-164259 | pCR TS 28.500 Adding business UC and reqs on keeping updated an NS instance |
pCR revision of S5-164174 |
NTT DOCOMO | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-164260 | pCR TS 28.500 Adding CM requirements |
pCR revision of S5-164170 |
China Mobile Com. Corporation | 28.5 1.1.0 |
S5-108 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-164261 | TS 28.510 Add UC NM retrieves VNFs info maintained by mgmt sys |
pCR revision of S5-164176 revised to S5-164294 |
Ericsson Inc. | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164262 | Potential use cases for relationship between MO creation and VNF instantiation |
pCR revision of S5-164223 |
Huawei Tech.(UK) Co., Ltd,Ericsson,Nokia | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164263 | pCR TS 28.510 Adding specification UC and reqs on modification of VNF instance non-applicatoin configuration through NFVO as part of NS update |
pCR revision of S5-164203 |
NTT DOCOMO | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164264 | UCs (on VNF/VNFC realization) requiring NRM support |
discussion revision of S5-164204 |
Ericsson Inc. | Rel-14 |
S5-108 AI: 6.4.1.2 |
endorsed | [WTS] [JSN] | ||
S5-164265 | Draft TS 28.500 | draft TS | Rapporteur (ZTE) | Rel-14 |
S5-108 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-164266 | Draft TS 28.510 | draft TS | Rapprteur(ZTE) | Rel-14 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164267 | Draft TS 28.512 | draft TS | Rapporteur(ZTE) | Rel-14 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164268 | Draft TS 28.516 | draft TS | Rapporteur (Huawei) | Rel-14 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164269 | Modify UC Virtualization-specific aspect failure detection and notification by VNFM |
pCR revision of S5-164205 |
Ericsson Inc. | 28.515 0.6.0 |
S5-108 AI: 6.4.1.3 |
noted | [WTS] [JSN] | ||
S5-164270 | pCR TS 28.516 Modification of procedure of virtualization-specific aspect healing through operation request to VNFM by EM |
pCR revision of S5-164210 |
Huawei Tech.(UK) Co., Ltd | 28.516 0.3.0 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164271 | Draft TS 28.515 | draft TS | Rapporteur (Huawei) | Rel-14 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164272 | Draft TS 28.517 | draft TS | Rapporteur (Huawei) | Rel-14 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164273 | Draft TS 28.518 | draft TS | Rapporteur (Huawei) | Rel-14 |
S5-108 AI: 6.4.1.3 |
approved | [WTS] [JSN] | ||
S5-164274 | Add UC Fetch VNF related VR performance measurements prepared by VNFM |
pCR revision of S5-164214 |
Ericsson Inc. | 28.52 0.6.0 |
S5-108 AI: 6.4.1.4 |
noted | [WTS] [JSN] | ||
S5-164275 | Draft TS 28.520 | draft TS | Rapporteur (Intel) | Rel-14 |
S5-108 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-164276 | Draft TS 28.522 | draft TS | Rapporteur (Intel) | Rel-14 |
S5-108 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-164277 | pCR TS 28.521 add VR PM data available notification procedure |
pCR revision of S5-164219 revised to S5-164299 |
Intel Corporation (UK) Ltd | 28.521 0.3.0 |
S5-108 AI: 6.4.1.4 |
revised | [WTS] [JSN] | ||
S5-164278 | Draft TS 28.525 | draft TS | Rapporteur (Nokia) | Rel-14 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164279 | pCR TS 28.525 Add requirements for NS instance lifecycle change notification |
pCR revision of S5-164235 |
ETRI | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164280 | pCR TS 28.525 Use case for NS querying and NS instance termination |
pCR revision of S5-164236 revised to S5-164295 |
ETRI | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164281 | pCR TS 28.525 add VNF identifier creation use case and requirements |
pCR revision of S5-164237 |
Intel Corporation (UK) Ltd | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164282 | pCR TS 28.526 add VNF instantiation procedures |
pCR revision of S5-164239 revised to S5-164297 |
Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164283 | pCR TS 28.526 add VNF scaling procedures |
pCR revision of S5-164240 revised to S5-164298 |
Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164284 | Draft TR 32.817 | draft TR | Rapporteur (Ericsson) | Rel-14 |
S5-108 AI: 6.4.2 |
approved | [WTS] [JSN] | ||
S5-164285 | Draft TS 28.301 | draft TS | Rapporteur (Nokia) | Rel-14 |
S5-108 AI: 6.4.3 |
approved | [WTS] [JSN] | ||
S5-164286 | Draft TR 32.865 | draft TR | Rapporteur (Nokia) | Rel-14 |
S5-108 AI: 6.5.2 |
approved | [WTS] [JSN] | ||
S5-164287 | Draft TR 32.880 | draft TR | Rapporteur (China Mobile) | Rel-14 |
S5-108 AI: 6.5.3 |
approved | [WTS] [JSN] | ||
S5-164288 | pCR TR 32.865 Add solutions for OAM aspects of SON for AAS |
pCR revision of S5-164249 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.865 0.4.0 |
S5-108 AI: 6.5.2 |
approved | [WTS] [JSN] | ||
S5-164289 | Draft TR 28.800 | draft TR | Rapporteur (Huawei) | Rel-14 |
S5-108 AI: 6.5.4 |
approved | [WTS] [JSN] | ||
S5-164290 | Draft TR 28.802 | draft TR | Rapporteur (Nokia) | Rel-14 |
S5-108 AI: 6.5.5 |
approved | [WTS] [JSN] | ||
S5-164291 | Draft TR 28.801 | draft TR | Rapporteur (Ericsson) | Rel-14 |
S5-108 AI: 6.5.6 |
approved | [WTS] [JSN] | ||
S5-164292 | pCR TR 28.801 Adding Slices Management use case |
other revision of S5-164256 |
Huawei |
S5-108 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-164293 | pCR TR 28.801 Adding use case for network slice lifecycle management |
other revision of S5-164258 |
Huawei |
S5-108 AI: 6.5.6 |
noted | [WTS] [JSN] | |||
S5-164294 | TS 28.510 Add UC NM retrieves VNFs info maintained by mgmt sys |
pCR revision of S5-164261 |
Ericsson Inc. | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164295 | pCR TS 28.525 Use case for NS querying and NS instance termination |
pCR revision of S5-164280 |
ETRI | 28.525 0.6.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164296 | Draft TS 28.526 | draft TS | Rapporteur(Nokia) | Rel-14 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164297 | pCR TS 28.526 add VNF instantiation procedures |
pCR revision of S5-164282 revised to S5-164300 |
Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
revised | [WTS] [JSN] | ||
S5-164298 | pCR TS 28.526 add VNF scaling procedures |
pCR revision of S5-164283 |
Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164299 | pCR TS 28.521 add VR PM data available notification procedure |
pCR revision of S5-164277 |
Intel Corporation (UK) Ltd | 28.521 0.3.0 |
S5-108 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-164300 | pCR TS 28.526 add VNF instantiation procedures |
pCR revision of S5-164297 |
Intel Corporation (UK) Ltd | 28.526 0.1.0 |
S5-108 AI: 6.4.1.5 |
approved | [WTS] [JSN] | ||
S5-164301 | LS on Addition of AVP code definitions |
LS out LS To: CT4 revision of S5-164221 |
Nokia |
S5-108 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-164302 | Rel-14 CR 32.281 Correction of reference to Annex B of TS 32.260 |
CR revision of S5-164186 |
Ericsson | 32.281 13.0.0 CR#22 catF | CH14, ANIMO | Rel-14 |
S5-108 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-164303 | OAM&P SWG action list |
other revision of S5-164036 |
WG Vice Chair (Huawei) |
S5-108 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-164304 | Draft TR 28.521 | draft TR | Rapporteur (Intel) | Rel-14 |
S5-108 AI: 6.4.1.4 |
approved | [WTS] [JSN] | ||
S5-164305 | LS to RAN3 on management of VRAN |
LS out LS To: RAN3 revision of S5-164224 |
Intel |
S5-108 AI: 6.2 |
approved | [WTS] [JSN] |
306 documents (1.0775091648102 seconds)