What a plenary is · chapter 4 of 12 · 8 minutes
4 The kinds of document, and the ten words that decide them
What a CR, a WID, a SID, an LS and a report are, and exactly what approved, noted, revised, postponed, withdrawn and merged each decide.
4.1 Two fields decide everything
Every document of the meeting carries a type and a status. Learn those two columns and you can read a plenary's document list without opening a single file.
The type says what kind of paper it is. The status says what the room did with it. Neither is a summary of the content, and neither is negotiable — they are the words the meeting's own record carries.
Chapter How to follow a plenary yourself is about where to find those columns. This chapter is about what the words in them mean.
4.2 The kinds of document
20 different kinds turned up at SA#112 [1]. The register breaks out ten, and these are the five you meet constantly.
-
CR — change request. A patch to an existing specification. Usually it travels inside a pack: only 14 stood alone [2] against 120 packs [3]. Chapter The change requests — 689 of them, in packs is entirely about these.
-
WID — work item description. The paper that asks permission to write normative text. 53 arrived new at this meeting [4].
-
SID — study item description. The same thing for a study, which produces a technical report rather than binding text. 10 arrived new [5] and 9 came back revised [6].
-
LS — liaison statement. A letter to or from another standards body or another 3GPP group. 18 came in [7]. Chapter The post — who wrote to 3GPP, and who 3GPP wrote back to follows the traffic.
-
Report and draft TR. 29 reports [8] and 28 draft technical reports [9] — the working groups' accounts of themselves, and technical reports brought for approval or for information.
Two more kinds fill the gaps. 20 discussion papers argue a position rather than propose text [10] — Qualcomm's case for markdown and git is one SP-260544. And 13 documents are typed only "other" [11], which at this meeting includes the Release 21 timeline SP-260595 and a paper from ten public bodies on 6G security SP-260584.
Beyond those, the meeting carries a handful of kinds that appear once or twice and are easy to miss. The agenda is itself a numbered document of the meeting SP-260361. So is the work plan review SP-260606, a working group's terms of reference SP-260470, a rapporteur's summary of a work item SP-260616, a study's own status report SP-260406 and an outgoing letter SP-260655.
4.3 The ten words
Every one of the meeting's 346 documents ended with one of these ten, and each one decides something different.
| Word | Docs | One that got it | What it decides |
|---|---|---|---|
| approved | 199 | SP-260379 | agreed, and it takes effect |
| noted | 68 | SP-260385 | read and filed; no decision taken |
| revised | 60 | SP-260417 | superseded by a new document number |
| postponed | 5 | SP-260411 | held over to a later meeting |
| endorsed | 4 | SP-260679 | supported, but not specification text |
| partially approved | 4 | SP-260387 | part of the pack went through |
| merged | 2 | SP-260613 | folded into another document |
| withdrawn | 2 | SP-260643 | pulled before a decision |
| agreed | 1 | SP-260595 | agreed in the joint session |
| replied to | 1 | SP-260363 | answered by an outgoing letter |
4.4 Approved
The plainest word, and the one most often over-read. It covers well over half the meeting, from the agenda itself SP-260361 through the largest change-request pack SP-260379 to the outgoing letter on 6G terminology SP-260697.
Approved means the plenary agreed it and it takes effect. It does not mean published, it does not mean implemented, and it does not tell you whether anybody argued.
4.5 Noted
Noted is the word people paraphrase into something it is not. It means read and filed: the plenary has seen the paper and is taking no decision on it.
Almost every incoming letter ends this way. NGMN's view on when 6G can realistically be deployed was noted SP-260385. So was SA WG2's status report on the 6G architecture study SP-260372, and the utilities' plea that gas and water meters not be forgotten SP-260382.
So were both halves of the specification-modernisation study — its own report SP-260406 and its draft technical report SP-260407 — and both of the papers arguing about how 3GPP should write, from Qualcomm SP-260544 and from Ericsson and Nokia SP-260600.
Noting a paper is not disagreeing with it. It is declining to decide.
4.6 Revised
Sixty documents ended revised, and this is the word that trips up anybody searching by title.
Revised means the document was replaced by a different document number during the meeting. The work item on an ultra low bitrate speech codec for satellite voice arrived as SP-260417 and was revised; the version that was approved is SP-260696. Same title, same work, two numbers, one decision — and the decision belongs to the second.
The work plan review went the same way SP-260606.
4.7 The words for a decision that did not quite happen
-
Postponed — held over to a later meeting. The change to the change-request process for 3GPP Forge was postponed SP-260411, and the report's whole account of it is three words: "This was postponed." [13] So was SA WG1's terms of reference SP-260470, but for a stated reason: so that all six groups could be compared side by side [14].
-
Withdrawn — pulled before a decision. The revision of the paper from ten public bodies on designing 6G to be secure from the start was withdrawn during the meeting SP-260643; the paper it revised was noted SP-260584.
-
Merged — folded into another document. Nokia's draft reply about emergency services ended merged SP-260613 while the reply that went out was SP-260655.
-
Partially approved — part of the pack went through SP-260387. The status word tells you the pack was split. It does not tell you where.
4.8 The words that are weaker or stranger than approval
Endorsed means supported, but what is endorsed is not specification text. The chair's guidance closing the modernisation argument was endorsed SP-260679, and the report says exactly that: "This was endorsed." [15] So was a rapporteur's summary of a work item SP-260616, and so was a slide template: "This Welcome slides Template was endorsed." [16]
Agreed appears once in the whole meeting, on the Release 21 timeline SP-260595, because it was agreed in the joint session with TSG RAN rather than by TSG SA alone [17].
Replied to also appears once, on the incoming letter from ETSI TC EMTEL about accessibility in emergency communications SP-260363. It is the only letter of the eighteen that got an answer.
4.9 Following one subject through the words
A subject rarely gets one document and one word. Three threads from this meeting show the usual shapes.
-
T1. Revised, then approved. The satellite speech codec arrived as SP-260417 and left as SP-260696. The report's account of the outcome is "This new WID was approved." [18], and the question it did not settle went upwards, to the Project Co-ordination Group [19].
-
T2. Noted, then withdrawn. The paper from ten public bodies on secure-by-design 6G was noted SP-260584 and its revision was pulled SP-260643. Two documents, no decision, and a subject that is plainly not finished.
-
T3. In, merged, out. A letter arrived and was replied to SP-260363; two answers were drafted; one was merged SP-260613 and one went out SP-260655.
Read those threads and the status words stop being labels and start being a grammar. "Revised" points forward to another number. "Merged" points sideways to a document that absorbed it. "Replied to" points to an outgoing letter. "Withdrawn" points nowhere, which is itself the information.
4.10 Where this leads
Part 2 of this course walks the meeting's substance in the order the agenda groups it, starting with the calendar: Release planning — the timeline, the checkpoint and the names.
Where the numbers in this chapter come from
- 20 different kinds of document distinct values of tdoctype over the same 346 rows, read 2026-08-04
- 14 documents of type 'CR' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='CR';", read 2026-08-04
- 120 documents of type 'CR pack' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='CR pack';", read 2026-08-04
- 53 documents of type 'WID new' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='WID new';", read 2026-08-04
- 10 documents of type 'SID new' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='SID new';", read 2026-08-04
- 9 documents of type 'SID revised' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='SID revised';", read 2026-08-04
- 18 documents of type 'LS in' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='LS in';", read 2026-08-04
- 29 documents of type 'report' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='report';", read 2026-08-04
- 28 documents of type 'draft TR' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='draft TR';", read 2026-08-04
- 20 documents of type 'discussion' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='discussion';", read 2026-08-04
- 13 documents of type 'other' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and tdoctype='other';", read 2026-08-04
- 26 specifications and reports were approved the '26 Entries' line closing the matching annex table of SP-112_Draft_Report_v005.md, read 2026-08-04
- 'This was postponed.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'It was decided to ask SA WG4, SA WG5 and SA WG6 to also submit ToRs to the next TSG SA meeting and SA WG1, SA WG2 and SA WG3 may update or re-submit the same ToR proposals.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'This was endorsed.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'This Welcome slides Template was endorsed.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'SP-260595 was presented in the Joint session and was agreed.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'This new WID was approved.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'TSG SA Chair to inform PCG on this issue of 3GPP involvement and legal requirements related to the dataset needed to train the AI model specific to 3GPP work.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 346 documents at SA#112 sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112';", read 2026-08-04
Check yourself
Answers appear when you pick one, with where they come from.
Q4.1 A document ends the meeting "noted". What was decided about it?
Noted means read and filed, with no decision taken. It is neither acceptance nor rejection, and 68 documents ended that way. 68 documents ended the meeting 'noted'
Q4.2 SP-260417 was revised and SP-260696 was approved. What is the relationship?
Revised means superseded by a new document number. They are one work item on the ultra low bitrate speech codec, and only the second one was approved. SP-260696
Q4.3 What does "endorsed" say that "approved" does not?
Endorsed means supported, but what is endorsed is not specification text. The chair's guidance on the modernisation study is the example. SP-260679
Q4.4 A change-request pack comes out "partially approved". What do you know?
Partially approved means part of the pack went through. The status word tells you the pack was split; it does not tell you where. SP-260387
Q4.5 What happened to the Nokia draft reply on emergency services, SP-260613?
It was a rival draft of the same reply and ended "merged" — folded into another document. Two documents ended the meeting merged. SP-260613
This chapter was built from a source register generated 2026-08-04. A fresher build of the register may hold different numbers.