The shape of it
1 What a plenary is
- 1 Why a group of groups needs a meeting of its own
- 2 SA#112 as arithmetic
- 3 How to read a plenary agenda
- 4 The kinds of document, and the ten words that decide them
2 What SA#112 decided
- 5 Release planning — the timeline, the checkpoint and the names
- 6 The new work — what the plenary let start
- 7 The change requests — 689 of them, in packs
- 8 The post — who wrote to 3GPP, and who 3GPP wrote back to
3 Weighing the record
- 9 Release 20 at this meeting, and what the numbers will not say
- 10 The report is a draft, and it shows
4 Reading a plenary yourself
Keep these in your head
One from each chapter that has one. The course carries 15 in all — the rest are in the chapters.
-
1.1 Why a group of groups needs a meeting of its own
A plenary does not write specifications. It decides what may be written, signs off what has been written, and settles the questions that sit between the groups doing the writing.
-
2.3 SA#112 as arithmetic
A plenary is mostly two piles of paper. One pile asks permission to write something. The other asks approval for something already written.
-
3.3 How to read a plenary agenda
The agenda's shape is fixed from meeting to meeting. What changes is which items fill up. Reading two agendas side by side tells you what moved without reading a single document.
-
4.2 The kinds of document, and the ten words that decide them
The type tells you what a document is asking for. A WID asks to write, a CR asks to change, an LS asks a question, a report asks to be believed.
-
5.6 Release planning — the timeline, the checkpoint and the names
A plenary is never working on one release. At SA#112 it was working on five, and the largest single group of documents belonged to none of them.
-
6.2 The new work — what the plenary let start
An approved work item description is a licence, not a line of specification. It says text may now be written; the text arrives at some later meeting as change requests.
-
7.2 The change requests — 689 of them, in packs
A pack number is one decision covering many changes. "SP-260379 was approved" is a sentence about twenty-three separate corrections.
-
8.2 The post — who wrote to 3GPP, and who 3GPP wrote back to
A letter to 3GPP is a document like any other. It gets a number, an agenda item, and one of the ten status words. Most of them get "noted".
-
9.2 Release 20 at this meeting, and what the numbers will not say
One release takes almost everything, one is being tidied, one exists as a date. That three-way split is what a plenary in the middle of a release cycle looks like, and reading it off the counts takes about a minute.
-
10.3 The report is a draft, and it shows
Where the report and the database agree, you have two independent counts of one thing. Where only the report has a number, you have a draft's number. Know which kind you are quoting.
-
11.3 How to follow a plenary yourself
The document list answers "what happened". The report answers "why". Opening documents before you have both is how a four-day meeting eats a week.
-
12.6 What this record does not tell you
The record is a record of paper. Every question of the form "so what does that mean for the industry" is outside it, and the honest answer is that this material cannot say.
Easy to get wrong
One from each chapter that has one. The course carries 19 in all.
-
1.3 Why a group of groups needs a meeting of its own
Fewer people checked in than registered. That is not evidence of a poorly attended meeting, and it is not evidence of anything else either: the record says how many people did each thing and nothing about why.
-
2.8 SA#112 as arithmetic
The mistake is not preferring one number. The mistake is quoting either of them without saying which question you asked. Both totals are true sentences about SA#112, and they are not the same sentence.
-
3.6 How to read a plenary agenda
Sixty-three documents under agenda item 20 is not the same as sixty-three Release 20 documents. Item 20 is the bin for Rel-20 change requests only, while across every kind of document — work items, studies, reports, letters — 140 belong to Rel-20 [1]. Confusing the two turns a change-request count into a release size.
-
4.4 The kinds of document, and the ten words that decide them
26 specifications and reports were approved at this meeting [2]. Every one of them still had to be produced by the support team and put on the server afterwards, and nothing in this record says when that happened. "Approved at SA#112" and "available" are different claims and only the first one is evidenced here.
-
5.3 Release planning — the timeline, the checkpoint and the names
"The plenary approved the Release 21 timeline" is wrong twice over. The word is "agreed", not "approved", and the agreement was reached in the joint session with TSG RAN, not by TSG SA on its own.
-
6.6 The new work — what the plenary let start
The work item was approved. The legal question was sent upwards, unanswered. Both halves are true at once, and a summary that reports only the approval leaves out the reason anybody remembers the item.
-
7.4 The change requests — 689 of them, in packs
Neither number is the wrong one. Quoting either without saying which question produced it is what makes a reader unable to check you. Chapter What this record does not tell you lists the other places where this record supports two true sentences at once.
-
8.4 The post — who wrote to 3GPP, and who 3GPP wrote back to
Noted does not mean ignored and it does not mean agreed. It means the plenary has read the letter and is taking no decision on it at this meeting. Writing "3GPP accepted NGMN's timeline" from a noted letter would be inventing a decision that was explicitly not taken.
-
9.7 Release 20 at this meeting, and what the numbers will not say
The tempting sentence is "Rel-20 is about AI, management and ambient IoT". What the record actually supports is "at this meeting, more separate change requests were submitted against the AI/ML enablement, management and ambient IoT specifications than against any others". The second sentence survives somebody checking it.
-
10.6 The report is a draft, and it shows
The temptation is to treat the wobble as trivial and everything else in the report as solid. The correct conclusion is narrower and more useful: this document has not had a proof-reading pass, so a single word in it — a name, a date, a status — is worth checking against the document list before you rest an argument on it.
-
11.4 How to follow a plenary yourself
A document number is not a decision. Searching a meeting for a title returns every version of it, and the versions have opposite results. Always take the status from the document list, never from the fact that a document exists.
-
12.10 What this record does not tell you
A generated register is trustworthy about provenance, not about coverage. "Not in the register" means nobody extracted it, not that it did not happen.
The numbers, and where each came from
Every one was counted out of a file on this machine. Hover a row to read the question that produced it.
- 66 66 documents came from SA WG5
- 57 57 documents came from SA WG3
- 41 41 documents came from SA WG6
- 33 33 documents came from SA WG2
- 28 28 documents came from SA WG4
- 62 62 different sources submitted documents
- 346 346 documents at SA#112
- 568 568 people registered for the meeting
- 365 365 people checked in and so kept their voting rights
- 110 110 people registered to attend online
- 23 23 top-level agenda items
- 30 30 new work items and study items were approved
- 11 11 work items and study items were updated
- 26 26 specifications and reports were approved
- 6 6 specifications and reports were noted for information
- 689 689 individual change requests
- 114 114 specifications were changed
- 18 18 incoming liaison statements
- 2 2 outgoing liaison statements
- 20 20 different kinds of document
- 120 120 documents of type 'CR pack'
- 53 53 documents of type 'WID new'
- 29 29 documents of type 'report'
- 28 28 documents of type 'draft TR'
- 20 20 documents of type 'discussion'
- 18 18 documents of type 'LS in'
- 14 14 documents of type 'CR'
- 13 13 documents of type 'other'
- 10 10 documents of type 'SID new'
- 9 9 documents of type 'SID revised'
- 199 199 documents ended the meeting 'approved'
- 68 68 documents ended the meeting 'noted'
- 60 60 documents ended the meeting 'revised'
- 5 5 documents ended the meeting 'postponed'
- 4 4 documents ended the meeting 'endorsed'
- 4 4 documents ended the meeting 'partially approved'
- 2 2 documents ended the meeting 'merged'
- 2 2 documents ended the meeting 'withdrawn'
- 1 1 document ended the meeting 'agreed'
- 1 1 document ended the meeting 'replied to'
- 162 162 documents carry no release
- 140 140 documents belong to Rel-20
- 26 26 documents belong to Rel-19
- 11 11 documents belong to Rel-21
- 5 5 documents belong to Rel-18
- 2 2 documents belong to Rel-17
- 346 The report's own document list holds 346 entries
- 487 487 change requests in packs belong to Rel-20
- 143 143 change requests in packs belong to Rel-19
- 36 36 change requests in packs belong to Rel-18
- 7 7 change requests in packs belong to Rel-17
- 0 No work item exception sheets were approved
- 284 284 of the 346 documents get a paragraph of their own in the report
- 40 40 times the report says 'There were no contributions to this agenda item.'
- 224 224 of the meeting's documents have a machine-written summary
- 120 120 change-request packs
Where to look it up
The 94 named sources it cites, by what they are.
Meeting document 34
SP-260606SP-260411SP-260595SP-260697SP-260584SP-260361SP-260544SP-260470SP-260616SP-260406SP-260655SP-260379SP-260385SP-260417SP-260679SP-260387SP-260613SP-260643SP-260363SP-260372SP-260382SP-260407SP-260600SP-260696SP-260604SP-260663SP-260664SP-260654SP-260690SP-260685SP-260675SP-260656SP-260692SP-260362
Agenda item 23
Agenda item 1: Opening of the Meeting Tuesday, 09 June 2026, 1400 local timeAgenda item 23: Close of Meeting Friday, 12 June 2026, 1730 local time (or earlier)Agenda item 3: Items for early consideration (Please contact the SA Chair in advance)Agenda item 2: Liaisons StatementsAgenda item 4: Reporting from SA Working Groups, other TSGs, and OthersAgenda item 5: Release PlanningAgenda item 6: Work Item Descriptions, Study Item Descriptions, SpecificationsAgenda item 7: SpecificationsAgenda item 8: Study on 3GPP AI/ML Consistency Alignment (FS_AIML_CAL)Agenda item 9: Study on Modernization of Specification Format and Procedures for 6G (FS_6GSpecs)Agenda item 10: Rel-10 and pre Rel-10 CRsAgenda item 11: Rel-11 CRsAgenda item 12: Rel-12 CRsAgenda item 13: Rel-13 CRsAgenda item 14: Rel-14 CRsAgenda item 15: Rel-15 CRsAgenda item 16: Rel-16 CRsAgenda item 17: Rel-17 CRsAgenda item 18: Rel-18 CRsAgenda item 19: Rel-19 CRsAgenda item 20: Rel-20 CRsAgenda item 21: Project Management & TSG SA owned specificationsAgenda item 22: Any Other Business
Quoted wording 18
'SP-260595 was presented in the Joint session and was agreed.''It was decided to ask SA WG4, SA WG5 and SA WG6 to also submit ToRs to the next TSG SA meeting and SA WG1, SA WG2 and SA WG3 may update or re-submit the same ToR proposals.''The TSG SA Chair was Mr. Puneet Jaine (Intel), The Vice Chairs were Dr. Tao Sun (China Mobile), Ms. LaeYoung Kim (LG Electronics) and Mr. Johannes Achter (Deutsche Telekom). The Secretary was Mr. Maurice Pope (MCC).''It was decided to use '6GC or 6G CN'.''TSG SA Chair to inform PCG on this issue of 3GPP involvement and legal requirements related to the dataset needed to train the AI model specific to 3GPP work.''Qualcomm objected to this decision.''The agenda was reviewed and approved.''The meeting was then closed.''The report of meeting SA#111 was approved.''Care should be taken to agree or endorse CRs against frozen releases in the working group level, especially given the existing commercial deployments.''This was postponed.''This was endorsed.''This Welcome slides Template was endorsed.''This new WID was approved.''conclusion: checkpoint in Dec.26 for RAN-CN other than connectivity services.''SA WG2 were asked to develop 6G interface names and naming convention, especially for RAN -CN interfaces and report to TSGs in September 2026.''- Continue with trial of separated ASN.1 in FS_6GSpecs''Interested companies are encouraged to demonstrate the use of Forge for 3GPP specifications (e.g. 38.331).'
Specification 12
TS 28.552TS 28.312TS 23.501TS 23.482TS 23.502TS 23.369TS 23.503TS 23.288TS 23.228TS 28.561TS 23.433TS 28.541
Page on the standards body's own site 5
The SA#112 document folderWelcome to TSG SA, revision 1SP-112 draft meeting report, version 0.0.5SP-260361, the SA#112 agenda, version 2TdocsByAgenda, the SA#112 document list
Meeting 1
Summary 1
Where to go from here
- The same subject, quick start — Under an hour, four chapters, the shape of the thing.
- The same subject, overview — Enough to follow the conversation and know what to look up.
- Every question of this course — 60 of them, on one page.
- The final test — 20 questions, 70 per cent to pass.
- Every source behind the course — 150 of them, each with its method.
The raised numbers on this page
- 140 documents belong to Rel-20 — sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and release='Rel-20';", read 2026-08-04
- 26 specifications and reports were approved — the '26 Entries' line closing the matching annex table of SP-112_Draft_Report_v005.md, read 2026-08-04