School of Specs Inside one plenary: TSG SA#112In depth

Cheat sheet

Inside one plenary: TSG SA#112

Singapore, June 2026 — 346 documents, read properly

Depth
In depth
Chapters
12
Reading
90 min
Questions
60
Sources cited
150

Back to the course

The shape of it

1 What a plenary is

  1. 1 Why a group of groups needs a meeting of its own
  2. 2 SA#112 as arithmetic
  3. 3 How to read a plenary agenda
  4. 4 The kinds of document, and the ten words that decide them

2 What SA#112 decided

  1. 5 Release planning — the timeline, the checkpoint and the names
  2. 6 The new work — what the plenary let start
  3. 7 The change requests — 689 of them, in packs
  4. 8 The post — who wrote to 3GPP, and who 3GPP wrote back to

3 Weighing the record

  1. 9 Release 20 at this meeting, and what the numbers will not say
  2. 10 The report is a draft, and it shows

4 Reading a plenary yourself

  1. 11 How to follow a plenary yourself
  2. 12 What this record does not tell you

Keep these in your head

One from each chapter that has one. The course carries 15 in all — the rest are in the chapters.

Easy to get wrong

One from each chapter that has one. The course carries 19 in all.

  • 1.3 Why a group of groups needs a meeting of its own

    Fewer people checked in than registered. That is not evidence of a poorly attended meeting, and it is not evidence of anything else either: the record says how many people did each thing and nothing about why.

  • 2.8 SA#112 as arithmetic

    The mistake is not preferring one number. The mistake is quoting either of them without saying which question you asked. Both totals are true sentences about SA#112, and they are not the same sentence.

  • 3.6 How to read a plenary agenda

    Sixty-three documents under agenda item 20 is not the same as sixty-three Release 20 documents. Item 20 is the bin for Rel-20 change requests only, while across every kind of document — work items, studies, reports, letters — 140 belong to Rel-20 [1]. Confusing the two turns a change-request count into a release size.

  • 4.4 The kinds of document, and the ten words that decide them

    26 specifications and reports were approved at this meeting [2]. Every one of them still had to be produced by the support team and put on the server afterwards, and nothing in this record says when that happened. "Approved at SA#112" and "available" are different claims and only the first one is evidenced here.

  • 5.3 Release planning — the timeline, the checkpoint and the names

    "The plenary approved the Release 21 timeline" is wrong twice over. The word is "agreed", not "approved", and the agreement was reached in the joint session with TSG RAN, not by TSG SA on its own.

  • 6.6 The new work — what the plenary let start

    The work item was approved. The legal question was sent upwards, unanswered. Both halves are true at once, and a summary that reports only the approval leaves out the reason anybody remembers the item.

  • 7.4 The change requests — 689 of them, in packs

    Neither number is the wrong one. Quoting either without saying which question produced it is what makes a reader unable to check you. Chapter What this record does not tell you lists the other places where this record supports two true sentences at once.

  • 8.4 The post — who wrote to 3GPP, and who 3GPP wrote back to

    Noted does not mean ignored and it does not mean agreed. It means the plenary has read the letter and is taking no decision on it at this meeting. Writing "3GPP accepted NGMN's timeline" from a noted letter would be inventing a decision that was explicitly not taken.

  • 9.7 Release 20 at this meeting, and what the numbers will not say

    The tempting sentence is "Rel-20 is about AI, management and ambient IoT". What the record actually supports is "at this meeting, more separate change requests were submitted against the AI/ML enablement, management and ambient IoT specifications than against any others". The second sentence survives somebody checking it.

  • 10.6 The report is a draft, and it shows

    The temptation is to treat the wobble as trivial and everything else in the report as solid. The correct conclusion is narrower and more useful: this document has not had a proof-reading pass, so a single word in it — a name, a date, a status — is worth checking against the document list before you rest an argument on it.

  • 11.4 How to follow a plenary yourself

    A document number is not a decision. Searching a meeting for a title returns every version of it, and the versions have opposite results. Always take the status from the document list, never from the fact that a document exists.

  • 12.10 What this record does not tell you

    A generated register is trustworthy about provenance, not about coverage. "Not in the register" means nobody extracted it, not that it did not happen.

The numbers, and where each came from

Every one was counted out of a file on this machine. Hover a row to read the question that produced it.

Where to look it up

The 94 named sources it cites, by what they are.

Meeting document 34

SP-260606SP-260411SP-260595SP-260697SP-260584SP-260361SP-260544SP-260470SP-260616SP-260406SP-260655SP-260379SP-260385SP-260417SP-260679SP-260387SP-260613SP-260643SP-260363SP-260372SP-260382SP-260407SP-260600SP-260696SP-260604SP-260663SP-260664SP-260654SP-260690SP-260685SP-260675SP-260656SP-260692SP-260362

Agenda item 23

Agenda item 1: Opening of the Meeting Tuesday, 09 June 2026, 1400 local timeAgenda item 23: Close of Meeting Friday, 12 June 2026, 1730 local time (or earlier)Agenda item 3: Items for early consideration (Please contact the SA Chair in advance)Agenda item 2: Liaisons StatementsAgenda item 4: Reporting from SA Working Groups, other TSGs, and OthersAgenda item 5: Release PlanningAgenda item 6: Work Item Descriptions, Study Item Descriptions, SpecificationsAgenda item 7: SpecificationsAgenda item 8: Study on 3GPP AI/ML Consistency Alignment (FS_AIML_CAL)Agenda item 9: Study on Modernization of Specification Format and Procedures for 6G (FS_6GSpecs)Agenda item 10: Rel-10 and pre Rel-10 CRsAgenda item 11: Rel-11 CRsAgenda item 12: Rel-12 CRsAgenda item 13: Rel-13 CRsAgenda item 14: Rel-14 CRsAgenda item 15: Rel-15 CRsAgenda item 16: Rel-16 CRsAgenda item 17: Rel-17 CRsAgenda item 18: Rel-18 CRsAgenda item 19: Rel-19 CRsAgenda item 20: Rel-20 CRsAgenda item 21: Project Management & TSG SA owned specificationsAgenda item 22: Any Other Business

Quoted wording 18

'SP-260595 was presented in the Joint session and was agreed.''It was decided to ask SA WG4, SA WG5 and SA WG6 to also submit ToRs to the next TSG SA meeting and SA WG1, SA WG2 and SA WG3 may update or re-submit the same ToR proposals.''The TSG SA Chair was Mr. Puneet Jaine (Intel), The Vice Chairs were Dr. Tao Sun (China Mobile), Ms. LaeYoung Kim (LG Electronics) and Mr. Johannes Achter (Deutsche Telekom). The Secretary was Mr. Maurice Pope (MCC).''It was decided to use '6GC or 6G CN'.''TSG SA Chair to inform PCG on this issue of 3GPP involvement and legal requirements related to the dataset needed to train the AI model specific to 3GPP work.''Qualcomm objected to this decision.''The agenda was reviewed and approved.''The meeting was then closed.''The report of meeting SA#111 was approved.''Care should be taken to agree or endorse CRs against frozen releases in the working group level, especially given the existing commercial deployments.''This was postponed.''This was endorsed.''This Welcome slides Template was endorsed.''This new WID was approved.''conclusion: checkpoint in Dec.26 for RAN-CN other than connectivity services.''SA WG2 were asked to develop 6G interface names and naming convention, especially for RAN -CN interfaces and report to TSGs in September 2026.''- Continue with trial of separated ASN.1 in FS_6GSpecs''Interested companies are encouraged to demonstrate the use of Forge for 3GPP specifications (e.g. 38.331).'

Specification 12

TS 28.552TS 28.312TS 23.501TS 23.482TS 23.502TS 23.369TS 23.503TS 23.288TS 23.228TS 28.561TS 23.433TS 28.541

Page on the standards body's own site 5

The SA#112 document folderWelcome to TSG SA, revision 1SP-112 draft meeting report, version 0.0.5SP-260361, the SA#112 agenda, version 2TdocsByAgenda, the SA#112 document list

Meeting 1

3GPP TSG SA#112

Summary 1

The machine-written summary of SA#112 on whatthespec.net

Where to go from here

The raised numbers on this page

  1. 140 documents belong to Rel-20sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and release='Rel-20';", read 2026-08-04
  2. 26 specifications and reports were approvedthe '26 Entries' line closing the matching annex table of SP-112_Draft_Report_v005.md, read 2026-08-04