5 What the meeting actually did
The work started, the documents approved, the two things held over, the two long arguments, and how the record handles a company that disagrees.
5.1 What was started
The largest single thing a plenary does is let work begin. At SA#112, 30 new work items and study items were approved [7], and 11 existing ones were updated [8].
Four of the approved ones show the range:
-
Post-quantum cryptography migration, a new work item description SP-260663
-
Withdrawing the Release 18 and Release 19 specifications of the 256-bit cryptographic algorithms, also a new work item description SP-260664
-
A study on additional capabilities for emergency communications, a new study item description SP-260654
-
An AI-based speech codec for satellite voice — the long argument of this meeting, and the subject of its own section below SP-260696
Starting work and withdrawing work sit side by side in that list, and both arrive as the same kind of paper.
5.2 What was finished
26 specifications and technical reports were approved [9]; 6 more were only noted for information [10].
Two of the 26 are worth naming:
-
The satellite integration study report — the report of the study on putting satellite components into the 5G architecture SP-260692
-
TR 21.919, the technical report that summarises every Release 19 feature SP-260604
One category came out empty. No work item exception sheets were approved at all: that annex of the report reads "No entries found." [11]
5.3 What was held over
Five documents were postponed [13]. Two of them are about how 3GPP runs itself.
The change-request process for 3GPP Forge. The proposal to change how change requests work for specification attachments held in Forge did not go through — the report says "This was postponed." SP-260411, [14]
Every working group's terms of reference. The terms of reference say what a group is allowed to work on. One group's update was on the table SP-260470; the plenary held the whole set over so all six can be looked at together.
Two further documents were withdrawn during the meeting [15], one of them the revision of a paper from ten public bodies about designing 6G to be secure from the start. The first version of that paper was noted; the revision was pulled SP-260584, SP-260643.
5.4 The long argument: a speech codec trained on data
The work item that took the most getting through was an AI-based speech codec for voice over satellite.
The paper trail is two numbers. The first was revised SP-260417; the revision was approved SP-260696, and the draft report of the meeting records it in four words.
What makes it worth studying is that the approval did not settle the hard part. The question of where the data to train the model may come from was not answered in the room; it was pushed up to the Project Co-ordination Group.
5.5 The other long argument: how 3GPP writes specifications
Agenda item 9 was the study on modernising the specification format for 6G, and it drew 11 documents [16].
It ended with a trial and no commitment:
-
The study's own report and its draft technical report were both noted SP-260406, SP-260407
-
Qualcomm argued for markdown and git SP-260544
-
Ericsson and Nokia demonstrated 3GPP Forge SP-260600
The guidance itself is the outcome to quote, and it commits to nothing beyond carrying on.
Alongside it, the guidance tells the study to keep one trial running that was already under way [18]. Forge appears in this record as a place 3GPP specifications and change requests might live; the record does not define it further than that.
5.6 What the record does when people disagree
The plenary asked SA WG2 to do a naming job, with a date attached.
The next line of the report is four words long.
The objection is written down next to the decision and the meeting carries on. There is no vote count anywhere in the report, no record of who else was for or against, and no reason given by either side.
A related naming question was settled in the same stretch of the meeting: "It was decided to use '6GC or 6G CN'." for the 6G core network [19].
5.7 The post
A plenary is also a post office. 18 liaison statements came in [20] and 2 went out [21].
Almost every incoming letter was simply noted. Exactly one ended "replied to" — the letter from ETSI TC EMTEL about accessibility parameters in emergency communications SP-260363 — and the reply is its own approved document SP-260655.
A rival draft of that same reply, written by a different company, ended "merged" SP-260613. The other outgoing letter was the one fixing 6G terminology SP-260697.
Everything on this page is read out of the meeting's draft report and its document list. The report says "Status: Draft - for comment" on its cover [22].
Where the numbers in this chapter come from
- 'It was decided to ask SA WG4, SA WG5 and SA WG6 to also submit ToRs to the next TSG SA meeting and SA WG1, SA WG2 and SA WG3 may update or re-submit the same ToR proposals.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'This new WID was approved.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'TSG SA Chair to inform PCG on this issue of 3GPP involvement and legal requirements related to the dataset needed to train the AI model specific to 3GPP work.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'Interested companies are encouraged to demonstrate the use of Forge for 3GPP specifications (e.g. 38.331).' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'SA WG2 were asked to develop 6G interface names and naming convention, especially for RAN -CN interfaces and report to TSGs in September 2026.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'Qualcomm objected to this decision.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 30 new work items and study items were approved the '30 Entries' line closing the matching annex table of SP-112_Draft_Report_v005.md, read 2026-08-04
- 11 work items and study items were updated the '11 Entries' line closing the matching annex table of SP-112_Draft_Report_v005.md, read 2026-08-04
- 26 specifications and reports were approved the '26 Entries' line closing the matching annex table of SP-112_Draft_Report_v005.md, read 2026-08-04
- 6 specifications and reports were noted for information the '6 Entries' line closing the matching annex table of SP-112_Draft_Report_v005.md, read 2026-08-04
- No work item exception sheets were approved annex F.2 of SP-112_Draft_Report_v005.md, which reads 'No entries found.', read 2026-08-04
- 689 individual change requests the crspec column of every CR and CR pack row of tdoc for meeting='SP-112', split on spaces and counted. Each token is one change request against one specification, read 2026-08-04
- 5 documents ended the meeting 'postponed' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and status='postponed';", read 2026-08-04
- 'This was postponed.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 2 documents ended the meeting 'withdrawn' sqlite3 /var/www/whatthespec.net/data/database/api/api.sqlite "select count(*) from tdoc where meeting='SP-112' and status='withdrawn';", read 2026-08-04
- Agenda item 9: Study on Modernization of Specification Format and Procedures for 6G (FS_6GSpecs) the agenda table of SP-260361_SA112_Agenda_v2.md for the wording; rows of tdoc whose ainumber starts '9' for the count, read 2026-08-04
- 'This was endorsed.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- '- Continue with trial of separated ASN.1 in FS_6GSpecs' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 'It was decided to use '6GC or 6G CN'.' found character for character in SP-112_Draft_Report_v005.md, which is a draft and says so on its cover, read 2026-08-04
- 18 incoming liaison statements the '18 Entries' line closing the matching annex table of SP-112_Draft_Report_v005.md, read 2026-08-04
- 2 outgoing liaison statements the '2 Entries' line closing the matching annex table of SP-112_Draft_Report_v005.md, read 2026-08-04
- SP-112 draft meeting report, version 0.0.5
Check yourself
Answers appear when you pick one, with where they come from.
Q5.1 How many new work items and study items were approved at SA#112?
30 new ones were approved and 11 existing ones were updated. 26 is the count of approved specifications and reports. 30 new work items and study items were approved
Q5.2 What happened to the ultra low bitrate speech codec work item?
SP-260417 was revised, SP-260696 was approved, and the report says "This new WID was approved." 'This new WID was approved.'
Q5.3 What did the plenary do about the legal question on the AI training data?
The record says the chair is to inform the PCG on 3GPP involvement and the legal requirements around the dataset. The work item was approved all the same. 'TSG SA Chair to inform PCG on this issue of 3GPP involvement and legal requirements related to the dataset needed to train the AI model specific to 3GPP work.'
Q5.4 How did agenda item 9, on modernising how 3GPP writes specifications, end?
SP-260406 and SP-260407 were both noted; SP-260679 was endorsed. The guidance continues a trial and encourages demonstrations. SP-260679
Q5.5 Which company's objection does the draft report name?
The report writes "Qualcomm objected to this decision." next to the task handed to SA WG2, and records nothing about anybody else's position. 'Qualcomm objected to this decision.'
Q5.6 How many of the 18 incoming liaison statements were replied to?
Almost all incoming letters were simply noted. Exactly one ended "replied to" — the letter from ETSI TC EMTEL. 1 document ended the meeting 'replied to'
This chapter was built from a source register generated 2026-08-04. A fresher build of the register may hold different numbers.