Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-174000 | Agenda | agenda | WG Chairman |
S5-114 AI: 2 |
approved | [WTS] [JSN] | |||
S5-174001 | Report from last SA5 meeting | report | MCC |
S5-114 AI: 4.1 |
approved | [WTS] [JSN] | |||
S5-174002 | SA5 status report at last SA meeting | report | WG Chairman |
S5-114 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-174003 | SA5 results at last SA meeting | report | WG Chairman |
S5-114 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-174004 | Time Plan for OAM&P |
other revised to S5-174328 |
WG Vice Chair (Huawei) |
S5-114 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-174005 | OAM Executive Report from THIS Meeting |
report revised to S5-174488 |
WG Vice Chair (Huawei) |
S5-114 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-174006 | Leaders meeting agenda | agenda | WG Chairman |
S5-114 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-174007 | Leaders meeting minutes | report | WG Chairman |
S5-114 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-174008 | CH Agenda and Time Plan | agenda | CH SWG Chair |
S5-114 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-174009 | CH Executive Report from THIS Meeting | report | CH SWG Chair |
S5-114 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-174010 | SA5 Meeting Calendar | other | Ericsson LM |
S5-114 AI: 5.4 |
noted | [WTS] [JSN] | |||
S5-174011 | SA5 Working Procedures | other | WG Vice Chair (Huawei) |
S5-114 AI: 5.1 |
approved | [WTS] [JSN] | |||
S5-174012 | SA5 Meeting Facility Requirements | other | WG Vice Chair (Orange) |
S5-114 AI: 5.1 |
approved | [WTS] [JSN] | |||
S5-174013 | Process for management of draft TSs/TRs |
other revised to S5-174348 |
WG Chairman |
S5-114 AI: 5.1 |
revised | [WTS] [JSN] | |||
S5-174014 | CR Quality Check | other | MCC |
S5-114 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-174015 | Deliverables due for the NEXT SA Plenary | other | MCC |
S5-114 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-174016 | Ongoing SA5 WIDs and SIDs | other | WG Vice Chair (Huawei) |
S5-114 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-174017 | SA5 3GPP Work Plan | other | MCC |
S5-114 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-174018 | Minutes of New Work Item proposals - OAM&P | report | WG Vice Chair (Orange) |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-174019 | Minutes of OAM&P Maintenance and Rel-15 small Enhancements | report | MCC |
S5-114 AI: 6.3 |
noted | [WTS] [JSN] | |||
S5-174020 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | report | Rapporteur (Huawei) |
S5-114 AI: 6.6.2 |
noted | [WTS] [JSN] | |||
S5-174021 | Minutes for Study on Implementation for the Partitioning of Itf-N | report | Rapporteur(China Mobile) |
S5-114 AI: 6.6.1 |
noted | [WTS] [JSN] | |||
S5-174022 | Minutes for Performance management for mobile networks that include virtualized network functions | report | Rapporteur(Intel) |
S5-114 AI: 6.4.1.1 |
noted | [WTS] [JSN] | |||
S5-174023 | Minutes for Study on Management and Orchestration of Network Slicing | report | Rapporteur (Ericsson) |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] | |||
S5-174024 | Minutes for Study on management aspects of next generation network architecture and features | report | Rapporteur(Nokia) |
S5-114 AI: 6.6.4 |
noted | [WTS] [JSN] | |||
S5-174025 | IPR and legal declaration | other | WG Chairman |
S5-114 AI: 3 |
noted | [WTS] [JSN] | |||
S5-174026 | Status of email approvals | other | WG Vice Chair (Orange) |
S5-114 AI: 5.1 |
available | [WTS] [JSN] | |||
S5-174027 | OAM&P SWG action list |
other revised to S5-174398 |
WG Vice Chair (Huawei) |
S5-114 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-174028 | Work Plan status | other | WG Chair |
S5-114 AI: 5.5 |
available | [WTS] [JSN] | |||
S5-174029 | Minutes of OAM&P SWG opening session | report | WG Vice Chair (Huawei) |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-174030 | Minutes of Study on Management aspects of selected IoT-related features | report | Rapporteur (Cisco) |
S5-114 AI: 6.6.5 |
noted | [WTS] [JSN] | |||
S5-174031 | Minutes of Study on a RESTful HTTP-based Solution Set | report | Rapporteur (Nokia) |
S5-114 AI: 6.6.6 |
noted | [WTS] [JSN] | |||
S5-174032 | Minutes of Study on management aspects of virtualized network functions that are part of the NR | report | Rapporteur (Intel) |
S5-114 AI: 6.6.7 |
noted | [WTS] [JSN] | |||
S5-174033 | Minutes of Study on Management Enhancement of CUPS of EPC Nodes | report | Rapporteur (Huawei) |
S5-114 AI: 6.6.8 |
noted | [WTS] [JSN] | |||
S5-174034 | Minutes of Study on OAM aspects of LTE and WLAN integration |
report revised to S5-174383 |
Rapporteur (Intel) |
S5-114 AI: 6.6.9 |
revised | [WTS] [JSN] | |||
S5-174035 | Minutes of Study on network policy management for mobile networks based on NFV scenarios | report | Rapporteur ( China Mobile) |
S5-114 AI: 6.6. |
noted | [WTS] [JSN] | |||
S5-174036 | Minutes of Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | report | Rapporteur (ORANGE) |
S5-114 AI: 6.5.1 |
noted | [WTS] [JSN] | |||
S5-174037 | Minutes of Management of QoE measurement collection | report | Rapporteur (Ericsson) |
S5-114 AI: 6.5.2 |
noted | [WTS] [JSN] | |||
S5-174038 | Minutes of Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements | report | Rapporteur (Ericsson) |
S5-114 AI: 6.5.3 |
noted | [WTS] [JSN] | |||
S5-174039 | Minutes of Provisioning of network slicing for 5G networks and services | report | Rapporteur (Huawei) |
S5-114 AI: 6.5.4 |
withdrawn | [WTS] [JSN] | |||
S5-174040 | Minutes of Study on system and functional aspects of Energy Efficiency in 5G networks | report | Rapporteur (ORANGE) |
S5-114 AI: 6.6.11 |
noted | [WTS] [JSN] | |||
S5-174041 | Skeleton TS 28.530 | draft TS | Ericsson LM | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
approved | [WTS] [JSN] | |
S5-174042 | pCR TS 28.530 Introduction and scope for network slicing in mobile networks |
pCR revised to S5-174359 |
Ericsson LM | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
revised | [WTS] [JSN] |
S5-174043 | pCR 28.304 Update with correct TS numbers and titles |
pCR revised to S5-174343 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
revised | [WTS] [JSN] |
S5-174044 | pCR 28.305 Update with correct TS numbers and titles | pCR | ORANGE | 28.305 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-174045 | LS from ETSI TC CYBER ccSA5 on Middlebox security | LS in | ETSI TC CYBER |
S5-114 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-174046 | LS from GSMA cc SA5 on Network Slicing initiative | LS in | GSMA |
S5-114 AI: 5.3 |
postponed | [WTS] [JSN] | |||
S5-174047 | LS from RAN2 to SA5 on supported features by 5GC for E-UTRA connected to 5G CN | LS in | R2-1706153 |
S5-114 AI: 5.3 |
postponed | [WTS] [JSN] | |||
S5-174048 | LS from SA2 to SA5 on standardization of Northbound SCEF API Charging |
LS in LS reply in S5-174301, S5-174301 |
S2-173674 |
S5-114 AI: 7.4.3 |
replied to | [WTS] [JSN] | |||
S5-174049 | LS from SA2 to SA5 on Request to update maximum data rate values in EPS |
LS in LS reply in S5-174299, S5-174299 |
S2-173685 |
S5-114 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-174050 | LS from SA2 to SA5 on EUTRAN sharing enhancement | LS in | S2-173701 |
S5-114 AI: 6.1 |
postponed | [WTS] [JSN] | |||
S5-174051 | LS from SA2 to SA5 on Support of NR using Dual Connectivity using EPC |
LS in LS reply in S5-174300 |
S2-174068 |
S5-114 AI: 7.4.2 |
replied to | [WTS] [JSN] | |||
S5-174052 | LS from TSG SA cc SA5 on Energy Efficiency | LS in | SP-170597 |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-174053 | Discussion Paper on the need for two options regarding PEECMON IRP | discussion | ORANGE |
S5-114 AI: 6.5.1 |
noted | [WTS] [JSN] | |||
S5-174054 | pCR TS 28.304 Add justification for the two options |
pCR revised to S5-174346 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
revised | [WTS] [JSN] |
S5-174055 | pCR TS 28.304 High-level use case and business level reqs for supervising PEE related alarms |
pCR revised to S5-174347 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
revised | [WTS] [JSN] |
S5-174056 | pCR TS 28.304 High-level use case and business level reqs for monitoring PEE configuration changes |
pCR revised to S5-174351 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
revised | [WTS] [JSN] |
S5-174057 | pCR TS 28.304 Specification-level requirements for Option No. 1 |
pCR revised to S5-174352 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
revised | [WTS] [JSN] |
S5-174058 | pCR TS 28.304 Specification-level requirements for Option No. 2 |
pCR revised to S5-174353 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
revised | [WTS] [JSN] |
S5-174059 | pCR TS 28.305 Structuring clauses 5 and 6 for introducing the two options |
pCR revised to S5-174354 |
ORANGE | 28.305 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
revised | [WTS] [JSN] |
S5-174060 | pCR TS 28.305 Input to information model for Option 2 |
pCR revised to S5-174355 |
ORANGE | 28.305 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
revised | [WTS] [JSN] |
S5-174061 | TS 28.306 Skeleton |
draft TS revised to S5-174356 |
ORANGE | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
revised | [WTS] [JSN] | |
S5-174062 | LS from RAN2 to SA5 on changing the Neighbour cell Relation acronym to “NCR” | LS in | R2-1707464 |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-174063 | Resubmitted LS from SA2 to SA5 on Stage 2 completion on introduction of WLAN as alternative technology for ProSe Direct Discovery |
LS in LS reply in S5-174298, S5-174298 |
S2-172506 |
S5-114 AI: 7.1 |
postponed | [WTS] [JSN] | |||
S5-174064 | Resubmitted LS on Collection Period correction for MDT M3 measurement in eUTRAN | LS in | R3-171382 |
S5-114 AI: 6.1 |
postponed | [WTS] [JSN] | |||
S5-174065 | Resubmitted LS reply to ATIS NRSC on “Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” |
LS in LS reply in S5-174297, S5-174297, S5-174331 |
ATIS |
S5-114 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-174066 | TR 32.972 skeleton |
draft TR revised to S5-174456 |
ORANGE | FS_EE_5G | Rel-15 |
S5-114 AI: 6.6.11 |
revised | [WTS] [JSN] | |
S5-174067 | LS from ETSI NFV to SA5 on Progress on ETSI NFV APIs specifications for Management and Orchestration interfaces | LS in | ETSI ISG NFV |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-174068 | Time management in OAM&P SWG | discussion | WG Vice Chair (Huawei) | Rel-15 |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | ||
S5-174069 | Report from 3GPP SA5-on charging work for CUPS ad hoc | report | CH SWG Chair |
S5-114 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-174070 | Report 5G management architecture WID planning conference call |
report revised to S5-174330 |
OAM&P SWG chairman | Rel-15 |
S5-114 AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-174071 | LS from SA2 cc SA5 on Supported features by 5GC for E-UTRA connected to 5G CN | LS in | S2-175192 |
S5-114 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-174072 | Response LS from SA2 to SA5 on progress of Network Slicing related work |
LS in LS reply in S5-174350, S5-174350 |
S2-175300 |
S5-114 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-174073 | LS from ETSI TC LI on Request of updated information on SA5 standards or reports related to billing systems and parameters for 5G access and services |
LS in LS reply in S5-174322, S5-174322 |
ETSI TC LI |
S5-114 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-174074 | Rel-14 CR 32.298 Correction on handling of Private and Public user ID for IMS charging |
CR revision of S5-173359 |
ORANGE,Nokia | 32.298 14.3.0 CR#6402 catA | TEI11 | Rel-14 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174075 | Rel-13 CR 32.298 Correction on handling of Private and Public user ID for IMS charging |
CR revision of S5-173357 |
ORANGE,Nokia | 32.298 13.7.0 CR#6392 catA | TEI11 | Rel-13 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174076 | Rel-12 CR 32.298 Correction on handling of Private and Public user ID for IMS charging |
CR revision of S5-173355 |
ORANGE,Nokia | 32.298 12.13.0 CR#6382 catA | TEI11 | Rel-12 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174077 | Rel-11 CR 32.298 Correction on handling of Private and Public user ID for IMS charging |
CR revision of S5-173353 |
ORANGE,Nokia | 32.298 11.17.0 CR#6372 catF | TEI11 | Rel-11 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174078 | Rel-12 CR 32.260 Correction in the Trigger for Charging from I-CSCF | CR | Nokia | 32.26 12.12.0 CR#386 catF | TEI12 | Rel-12 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174079 | Rel-13 CR 32.260 Correction in the Trigger for Charging from I-CSCF | CR | Nokia | 32.26 13.8.0 CR#387 catA | TEI12 | Rel-13 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174080 | Rel-14 CR 32.260 Correction in the Trigger for Charging from I-CSCF | CR | Nokia | 32.26 14.2.0 CR#388 catA | TEI12 | Rel-14 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174081 | Rel-14 CR 32.298 Addition of the fields ProSe Direct Discovery for Public Safety |
CR revision of S5-173343 |
Huawei | 32.298 14.3.0 CR#6352 catB | CH14-ProSe | Rel-14 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174082 | pCR TS 32.972 - Introduction | pCR | ORANGE | 32.972 0.0.0 | FS_EE_5G | Rel-15 |
S5-114 AI: 6.6.11 |
noted | [WTS] [JSN] |
S5-174083 | pCR TS 32.972 – About EE KPIs and metrics |
pCR revised to S5-174457 |
ORANGE | 32.972 0.0.0 | FS_EE_5G | Rel-15 |
S5-114 AI: 6.6.11 |
revised | [WTS] [JSN] |
S5-174084 | Response LS from SA6 to SA5 on standardization of Northbound SCEF API Charging |
LS in LS reply in S5-174302, S5-174302 |
S6-171107 |
S5-114 AI: 7.4.3 |
replied to | [WTS] [JSN] | |||
S5-174085 | LS from BBF to SA5 on Cooperation on Network Slicing |
LS in LS reply in S5-174329, S5-174329, S5-174382 |
Broadband Forum (BBF) |
S5-114 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-174086 | Northbound Application Program Interfaces (APIs) for exposure function interworking charging | draft TS | HUAWEI TECHNOLOGIES Co. Ltd. | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
approved | [WTS] [JSN] | |
S5-174087 | Rel-14 CR 32.298 Addition of FE Identifier List to IMS Charging |
CR revision of S5-173345 revised to S5-174310 |
Deutsche Telekom AG | 32.298 14.3.0 CR#6412 catB | CH14-DCCII | Rel-14 |
S5-114 AI: 7.3 |
revised | [WTS] [JSN] |
S5-174088 | Overview of SDOs’ work on network slicing | discussion | ORANGE |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-174089 | LS from BBF to SA5 on User Services Platform specification available for review | LS in | BBF |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-174090 | LS on Evolution of IMSI format and E.212 Recommendation | LS in | ITU-T Study Group 2 |
S5-114 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-174091 | TR 32.848 Skeleton | draft TR | China Mobile Com. Corporation | FS_VBCLTE | Rel-15 |
S5-114 AI: 7.5.4 |
approved | [WTS] [JSN] | |
S5-174092 | Discussion on the organization of 5G related WIDs | discussion | ORANGE, NEC |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-174093 | TR 32.848 Skeleton | draft TR | China Mobile Com. Corporation | FS_VBCLTE | Rel-15 |
S5-114 AI: 7.5.4 |
withdrawn | [WTS] [JSN] | |
S5-174094 | pCR to 28.801 NSSI role |
pCR revised to S5-174361 |
Cisco Systems Inc. | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174095 | pCR to 28.801 Definitions |
pCR revised to S5-174362 |
Cisco Systems Inc. | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174096 | pCR to 28.801 SON Clarification |
pCR revised to S5-174363 |
Cisco Systems Inc. | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174097 | pCR to 28.801 Automated NSI optimization.doc | pCR | Cisco Systems Inc. | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174098 | SID revision Study on IoT Management |
SID revised revised to S5-174426 |
Cisco Systems Inc. | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
revised | [WTS] [JSN] | |
S5-174099 | pCR to 32.875 Handover related measurements | pCR | Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
withdrawn | [WTS] [JSN] |
S5-174100 | pCR to 32.875 Cell level radio bearer QoS related measurements | pCR | Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
withdrawn | [WTS] [JSN] |
S5-174101 | pCR to 32.875 Radio resource utilization related measurements | pCR | Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
withdrawn | [WTS] [JSN] |
S5-174102 | pCR to 32.875 Paging related measurements | pCR | Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
withdrawn | [WTS] [JSN] |
S5-174103 | proposal on 5G network and service management WI structure | discussion | Intel Finland Oy, ZTE | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174104 | New WID on Management of NG-RAN that includes virtualized network | WID new | Intel Finland Oy | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174105 | New WID on Automation of network slicing | WID new | Intel Finland Oy | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174106 | New WID on performance measurements for NG-RAN | WID new | Intel Finland Oy | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174107 | pCR TR 32.864 Add potential solutions to support partially virtualized NF under NFV concept |
pCR revised to S5-174442 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174108 | pCR TR 32.864 Corrections regarding transport network requirements | pCR | Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
withdrawn | [WTS] [JSN] |
S5-174109 | pCR TR 32.864 Add gap analysis on adding, deleting and replacing the non-virtualized part of gNB |
pCR revised to S5-174439 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174110 | pCR TR 32.864 Add the CU and DU modelling option | pCR | Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
noted | [WTS] [JSN] |
S5-174111 | pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB |
pCR revised to S5-174440 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174112 | pCR TR 32.864 Add potential solution for establishing relation between the CN NF and the gNB |
pCR revised to S5-174441 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174113 | pCR TR 32.864 Add potential solution for instantiating NS containing CN VNF and gNB |
pCR revised to S5-174443 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174114 | pCR TR 32.864 Add potential solution for updating transport network requirements |
pCR revised to S5-174444 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174115 | pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB |
pCR revised to S5-174445 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174116 | pCR TR 32.864 Add potential solution for adding VNFFGD and VNFFGs for the gNB | pCR | Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
noted | [WTS] [JSN] |
S5-174117 | pCR TR 32.864 add UC for collecting performance measurements | pCR | Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
noted | [WTS] [JSN] |
S5-174118 | pCR TR 32.864 add UC for fault detection | pCR | Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
noted | [WTS] [JSN] |
S5-174119 | pCR TR 32 864 Add UC on validation of NsDf for a NSD |
pCR revised to S5-174435 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174120 | pCR TR 32.864 Add conclusions |
pCR revised to S5-174446 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174121 | pCR TR 32.864 Add Recommendations |
pCR revised to S5-174447 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174122 | pCR TR 32.868 Add LWA overview and concept |
pCR revised to S5-174449 |
Intel Corporation (UK) Ltd | 32.868 0.1.0 | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
revised | [WTS] [JSN] |
S5-174123 | pCR TR 32.868 Add UC on provisioning WLAN informaton to WT for non-collocated LWA |
pCR revised to S5-174380 |
Intel Corporation (UK) Ltd | 32.868 0.1.0 | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
revised | [WTS] [JSN] |
S5-174124 | pCR TR 32.868 Add UC on management of relation between eNB and WT for non-collocated LWA |
pCR revised to S5-174381 |
Intel Corporation (UK) Ltd | 32.868 0.1.0 | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
revised | [WTS] [JSN] |
S5-174125 | pCR TR 32.868 Add UC on provisioning WLAN informaton to eNB for collocated LWA |
pCR revised to S5-174450 |
Intel Corporation (UK) Ltd | 32.868 0.1.0 | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
revised | [WTS] [JSN] |
S5-174126 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR |
CR revised to S5-174340 |
Intel Corporation (UK) Ltd | 32.401 14.1.1 CR#40 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
revised | [WTS] [JSN] |
S5-174127 | CR TS 32.404 Add new collection method for 3GPP NF performance measurements related to VR |
CR revised to S5-174459 |
Intel Corporation (UK) Ltd | 32.404 14.0.0 CR#13 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
revised | [WTS] [JSN] |
S5-174128 | CR TS 32.409 Add VR related measurements for IMS NFs |
CR revised to S5-174341 |
Intel Corporation (UK) Ltd | 32.409 14.0.0 CR#61 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
revised | [WTS] [JSN] |
S5-174129 | CR TS 32.426 Add VR related measurements for EPC NFs |
CR revised to S5-174342 |
Intel Corporation (UK) Ltd | 32.426 14.0.0 CR#66 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
revised | [WTS] [JSN] |
S5-174130 | pCR TR 28.801 Changes on CSMF | pCR | Intel Corporation (UK) Ltd | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
withdrawn | [WTS] [JSN] |
S5-174131 | Rel-14 CR 32.298 Introduce T4 Device Trigger charging |
CR revision of S5-173399 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.298 14.3.0 CR#6332 catB | CH14-SMST4 | Rel-14 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174132 | pCR TR 32.899 Roaming |
pCR revised to S5-174316 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174133 | pCR TR 32.899 Online and Offline Charging evaluation |
pCR revised to S5-174317 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174134 | pCR 32.869 Update of Problems and Goals |
pCR revised to S5-174311 |
Ericsson | 32.869 0.5.0 | FS_DOCME | Rel-14 |
S5-114 AI: 7.5.1 |
revised | [WTS] [JSN] |
S5-174135 | pCR 32.869 Update of Introduction |
pCR revised to S5-174312 |
Ericsson | 32.869 0.5.0 | FS_DOCME | Rel-14 |
S5-114 AI: 7.5.1 |
revised | [WTS] [JSN] |
S5-174136 | pCR 32.869 Update of Offline Part |
pCR revised to S5-174313 |
Ericsson | 32.869 0.5.0 | FS_DOCME | Rel-14 |
S5-114 AI: 7.5.1 |
revised | [WTS] [JSN] |
S5-174137 | Discussion on introducing Intelligence in 3GPP network management | discussion | Huawei | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174138 | New SID Study on introducing intelligence in management of 3GPP network |
SID new revised to S5-174349 |
Huawei | Rel-15 |
S5-114 AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-174139 | Discussion on the potential Rel-15 5G management WIDs | discussion | Huawei | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174140 | New WID on multi-operator management of services and slices | WID new | Huawei | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174141 | Discussion on modifications of Area Scope parameters for MDT | discussion | Huawei | Rel-15 |
S5-114 AI: 6.3 |
noted | [WTS] [JSN] | ||
S5-174142 | Rel-15 CR 32.422 Modification of parameters of Area Scope for MDT | CR | Huawei | 32.422 14.0.0 CR#279 catF | TEI15 | Rel-15 |
S5-114 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-174143 | pCR 32.867 Add potential solution for PGW and SGW related measurements in CUPS |
pCR revised to S5-174448 |
Huawei | 32.867 0.3.0 | FS_MECUPS | Rel-14 |
S5-114 AI: 6.6.8 |
revised | [WTS] [JSN] |
S5-174144 | pCR 32.867 Editor's notes resolution | pCR | Huawei | 32.867 0.3.0 | FS_MECUPS | Rel-14 |
S5-114 AI: 6.6.8 |
noted | [WTS] [JSN] |
S5-174145 | pCR 32.867 Add conclusions | pCR | Huawei | 32.867 0.3.0 | FS_MECUPS | Rel-14 |
S5-114 AI: 6.6.8 |
noted | [WTS] [JSN] |
S5-174146 | pCR 32.867 Add recommendations | pCR | Huawei | 32.867 0.3.0 | FS_MECUPS | Rel-14 |
S5-114 AI: 6.6.8 |
noted | [WTS] [JSN] |
S5-174147 | pCR 32.866 Discussion of REST implementation levels |
pCR revised to S5-174429 |
Huawei | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
revised | [WTS] [JSN] |
S5-174148 | pCR 32.866 Discussion of options for resource identification |
pCR revised to S5-174430 |
Huawei | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
revised | [WTS] [JSN] |
S5-174149 | pCR 32.866 Discussion of options for asynchronous operations |
pCR revised to S5-174432 |
Huawei | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
revised | [WTS] [JSN] |
S5-174150 | pCR 32.866 Subscribe/notify operations | pCR | Huawei | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
merged | [WTS] [JSN] |
S5-174151 | pCR 28.530 Add concept and use case of V2X services using network slicing | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174152 | pCR 28.530 Add concept and use case of network slicing with fixed mobile convergence | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174153 | pCR 28.530 Add business level use cases of providing communication services with massive IoT connections using network slice | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174154 | pCR 28.530 Add concept of services using network slicing | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174155 | pCR 28.530 Add network slice definitions | pCR | Huawei, Ericsson | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
noted | [WTS] [JSN] |
S5-174156 | pCR 28.530 Add network slice subnet definitions | pCR | Huawei, Ericsson | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174157 | pCR 28.530 Add potential network slice deployment scenarios | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174158 | pCR 28.530 Add definition for network slice template | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174159 | pCR 28.530 Add network slice management related roles description | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174160 | pCR 28.530 Add network slice lifecycle management description | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174161 | pCR 28.530 Add high level service requirements | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174162 | pCR 28.530 Use of the non-3GPP parts of a slice by the 3GPP management system | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174163 | pCR 28.530 Clarify communication service instance lifecycle | pCR | Huawei, CATR, China Telecom | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174164 | pCR 28.530 Exposure of management functions to 3rd party | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174165 | pCR 28.530 Exposure of the management data to 3rd party | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174166 | pCR 28.530 Definition of service instance | pCR | Huawei | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174167 | pCR 28.530 Add business level general requirements | pCR | Huawei, China Unicom, CATR | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174168 | pCR 32.866 Add REST design principles |
pCR revised to S5-174427 |
Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
revised | [WTS] [JSN] |
S5-174169 | pCR 32.866 Add Richardson Maturity Model | pCR | Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
merged | [WTS] [JSN] |
S5-174170 | pCR 32.866 Add HTTP method descriptions |
pCR revised to S5-174428 |
Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
revised | [WTS] [JSN] |
S5-174171 | pCR 32.866 Clarify resource identification mechanism | pCR | Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] |
S5-174172 | pCR 32.866 Add design patterns |
pCR revised to S5-174433 |
Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
revised | [WTS] [JSN] |
S5-174173 | pCR 32.866 Clarify mapping of the Alarm IRP |
pCR revised to S5-174434 |
Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
revised | [WTS] [JSN] |
S5-174174 | pCR 28.800 Key issues to be considered for 5G management architecture options |
pCR revised to S5-174396 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174175 | pCR 28.800 Considerations on the 5G NF management standard interfaces |
pCR revised to S5-174397 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174176 | pCR 28.800 Add use case of management and orchestration architecture for management of communication service |
pCR revised to S5-174399 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174177 | pCR 28.800 Add requirement for management and orchestration of networks containing non-5G NE and 5G NE |
pCR revised to S5-174400 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174178 | pCR 28.800 Define key management functionality | pCR | Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
withdrawn | [WTS] [JSN] |
S5-174179 | pCR 28.800 Mapping requirements between 5G management architecture and NFV-MANO architecture |
pCR revised to S5-174401 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174180 | pCR 28.800 Use case of multi-operator service support with management data |
pCR revised to S5-174402 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174181 | pCR 28.800 Interface for service management |
pCR revised to S5-174403 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174182 | pCR 28.800 Concept of infrastructure management function |
pCR revised to S5-174404 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174183 | Draft LS reply from SA5 to SA2 on progress of Network Slicing related work |
LS out LS is reply to S5-174072 LS To: 3GPP SA2 revised to S5-174350 |
Huawei | Rel-15 |
S5-114 AI: 6.1 |
revised | [WTS] [JSN] | ||
S5-174184 | pCR 28.801 Clarifications on the Editor's Notes related to management architecture | pCR | Huawei, China Unicom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
merged | [WTS] [JSN] |
S5-174185 | pCR 28.801 Clarification on Use case and Requirements for Slice Specific information configuration for CN | pCR | Huawei | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] |
S5-174186 | pCR 28.801 Clarifications on the Editor's Notes related to SON | pCR | Huawei, China Unicom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
merged | [WTS] [JSN] |
S5-174187 | pCR 28.801 Clarifications on the Editor's Notes related to the relation between two use cases | pCR | Huawei | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] |
S5-174188 | pCR 28.801 Update solution for Management support to facilitate UE roaming between Network Slice Instances in different administrative domains | pCR | Huawei, China Unicom, CATR | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] |
S5-174189 | pCR 28.801 Clean-up the use case for management data isolation when multiple customers share the same Network Slice Instance | pCR | Huawei, China Unicom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174190 | pCR 28.801 Clean-up requirements for Network slice lifecycle management and Network slice configuration management | pCR | Huawei, China Unicom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
merged | [WTS] [JSN] |
S5-174191 | pCR 28.801 Update solution for modifying a network slice instance | pCR | Huawei, China Unicom, CATR | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] |
S5-174192 | pCR 28.801 Clean-up of Editor's notes on RAN part of network slice instance | pCR | Huawei, China Unicom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
merged | [WTS] [JSN] |
S5-174193 | pCR 28.801 Management function involvement for providing different types of services | pCR | Huawei | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] |
S5-174194 | pCR 28.801 Update potential solution for the priority of the NSI | pCR | Huawei | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] |
S5-174195 | pCR 28.801 Add potential solution for managing the shared NSSI constituent managed by the other NSSMF(s) | pCR | Huawei, China Unicom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
merged | [WTS] [JSN] |
S5-174196 | pCR 28.801 Resolving the editor’s notes of management exposure solution | pCR | Huawei | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] |
S5-174197 | pCR 28.801 Management function involvement for providing different types of services | pCR | Huawei | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
withdrawn | [WTS] [JSN] |
S5-174198 | Discussion on edge computing management way forward | discussion | Huawei | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
noted | [WTS] [JSN] | |
S5-174199 | pCR 28.802 Introduction of edge computing management |
pCR revised to S5-174411 |
Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174200 | pCR 28.802 Management of 5GC NFs supporting edge computing |
pCR revised to S5-174414 |
Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174201 | pCR 28.802 Management of edge computing AFs |
pCR revised to S5-174415 |
Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174202 | pCR 28.802 Management of edge computing services |
pCR revised to S5-174417 |
Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174203 | pCR 28.802 Update usecase and requirements for Management support for NRF | pCR | Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
noted | [WTS] [JSN] |
S5-174204 | pCR 28.802 Update solution of configuration management of 5GC | pCR | Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
noted | [WTS] [JSN] |
S5-174205 | Slice management modelling | discussion | Ericsson Inc. | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] | ||
S5-174206 | add UC and Req re service hosting for network slice management | discussion | Ericsson Inc. |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] | |||
S5-174207 | Support EUTRAN sharing enhancement |
CR revised to S5-174269 |
Ericsson Inc. | 28.659 14.1.0 CR#20 catB | OAM14 | Rel-15 |
S5-114 AI: 6.3 |
revised | [WTS] [JSN] |
S5-174208 | Support EUTRAN new sharing arrangement |
CR revised to S5-174268 |
Ericsson Inc. | 28.658 14.0.0 CR#19 catB | OAM14 | Rel-14 |
S5-114 AI: 6.3 |
revised | [WTS] [JSN] |
S5-174209 | New WID on Fault supervision of network slicing for 5G networks and services |
WID new revised to S5-174413 |
ZTE Corporation |
S5-114 AI: 6.2 |
revised | [WTS] [JSN] | |||
S5-174210 | R14 CR TS 28.510 Remove the duplicated use cases and requirements | CR | ZTE Corporation | 28.51 14.0.0 CR#1 catF | OAM14 | Rel-14 |
S5-114 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-174211 | pCR 32.848 Skeleton update |
pCR revised to S5-174323 |
China Mobile Com. Corporation | 32.848 0.0.0 | FS_VBCLTE | Rel-15 |
S5-114 AI: 7.5.4 |
revised | [WTS] [JSN] |
S5-174212 | pCR 32.848 Refrence |
pCR revised to S5-174324 |
China Mobile Com. Corporation | 32.848 0.0.0 | FS_VBCLTE | Rel-15 |
S5-114 AI: 7.5.4 |
revised | [WTS] [JSN] |
S5-174213 | pCR 32.848 Scope | pCR | China Mobile Com. Corporation | 32.848 0.0.0 | FS_VBCLTE | Rel-15 |
S5-114 AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-174214 | Provisioning of network slicing for 5G networks and services | draft TS | Huawei Telecommunication India | NETSLICE | Rel-15 |
S5-114 AI: 6.5.4 |
not treated | [WTS] [JSN] | |
S5-174215 | pCR 28.531 Adding new skeleton clauses | pCR | Huawei, Nokia | 28.531 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.4 |
withdrawn | [WTS] [JSN] |
S5-174216 | pCR 28.531 Adding content of scope | pCR | Huawei | 28.531 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.4 |
withdrawn | [WTS] [JSN] |
S5-174217 | pCR to 32.857 Handover related measurements |
pCR revised to S5-174424 |
Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
revised | [WTS] [JSN] |
S5-174218 | pCR to 32.857 Cell level radio bearer QoS related measurements | pCR | Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
approved | [WTS] [JSN] |
S5-174219 | pCR to 32.857 Radio resource utilization related measurements | pCR | Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
approved | [WTS] [JSN] |
S5-174220 | pCR to 32.857 Paging related measurements |
pCR revised to S5-174437 |
Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
revised | [WTS] [JSN] |
S5-174221 | Updated Work Plan for Study TR 32.899 |
discussion revised to S5-174375 |
HUAWEI TECHNOLOGIES Co. Ltd. | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] | |
S5-174222 | Rel-15 pCR 32.899 Introduce Service Based architecture topic |
pCR revised to S5-174318 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174223 | Rel-15 pCR 32.899 Network Slicing for Tenant Based Charging |
pCR revised to S5-174319 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174224 | Rel-15 pCR 32.899 Network Capability Exposure of Charging System |
pCR revised to S5-174320 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174225 | Rel-15 pCR 32.899 Charging for Interworking between 5G System and Existing Systems |
pCR revised to S5-174321 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174226 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Quota Management |
pCR revised to S5-174370 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174227 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Parallel Traffic |
pCR revised to S5-174371 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174228 | Rel-15 pCR 32.254 Update of the skeleton |
pCR revised to S5-174306 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.254 0.0.0 | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-174229 | Rel-15 pCR 32.254 Scope and Reference |
pCR revised to S5-174307 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.254 0.0.0 | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-174230 | Rel-15 pCR 32.254 Definitions, Symbols and Abbreviations |
pCR revised to S5-174308 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.254 0.0.0 | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-174231 | Rel-15 pCR 32.254 Architecture considerations |
pCR revised to S5-174309 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.254 0.0.0 | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-174232 | LSOut to Reply on SA2 for LS on standardization of Northbound SCEF API Charging |
LS out LS To: SA2 revised to S5-174301 |
HUAWEI TECHNOLOGIES Co. Ltd. |
S5-114 AI: 7.1 |
revised | [WTS] [JSN] | |||
S5-174233 | pCR TR 32.870 Refinement on existing Application and Diameter description |
pCR revised to S5-174314 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.1.0 | FS_FWDCA | Rel-15 |
S5-114 AI: 7.5.2 |
revised | [WTS] [JSN] |
S5-174234 | Charging enhancement for eFMSS |
CR revised to S5-174303 |
China Telecom Corporation Ltd. | 32.251 14.3.0 CR#498 catB | eFMSS_CH | Rel-15 |
S5-114 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-174235 | pCR TR 32.870 Introduction of key issues |
pCR revised to S5-174315 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.1.0 | FS_FWDCA | Rel-15 |
S5-114 AI: 7.5.2 |
revised | [WTS] [JSN] |
S5-174236 | Charging enhancement for eFMSS |
CR revised to S5-174304 |
China Telecom Corporation Ltd. | 32.298 14.3.0 CR#643 catB | eFMSS_CH | Rel-15 |
S5-114 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-174237 | Charging enhancement for eFMSS |
CR revised to S5-174305 |
China Telecom Corporation Ltd. | 32.299 14.4.0 CR#789 catB | eFMSS_CH | Rel-15 |
S5-114 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-174238 | pCR 28.530 text proposal for background and concepts | pCR | Ericsson Limited | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
not treated | [WTS] [JSN] |
S5-174239 | CR 32.865 clarify management and control functionalities |
CR revised to S5-174336 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.865 15.0.0 CR#1 catD | FS_OAM_SON_AAS | Rel-15 |
S5-114 AI: 6.3 |
revised | [WTS] [JSN] |
S5-174240 | new WID on SON for AAS deployment management |
WID new revised to S5-174335 |
Nokia, Alcatel-Lucent Shanghai Bell | Rel-15 |
S5-114 AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-174241 | New WID on NR NRM IRP | WID new | Nokia, Alcatel-Lucent Shanghai Bell | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174242 | New WID on Performance Measurement for NR | WID new | Nokia, Alcatel-Lucent Shanghai Bell | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174243 | New WID on 5GC NRM IRP | WID new | Nokia, Alcatel-Lucent Shanghai Bell | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174244 | Proposed way forward of 5G NFs management normative works | discussion | Nokia, Alcatel-Lucent Shanghai Bell | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174245 | discussion paper on NR management WID planning | discussion | Nokia, Alcatel-Lucent Shanghai Bell | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174246 | discussion papar for 28.800 on 5G service management information framework | discussion | Nokia, Alcatel-Lucent Shanghai Bell | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
noted | [WTS] [JSN] | |
S5-174247 | PCR 28.800 Add service management model definition | pCR | Nokia, Alcatel-Lucent Shanghai Bell | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
noted | [WTS] [JSN] |
S5-174248 | pCR 28.531 Adding new skeleton clauses | pCR | Huawei, Nokia | 28.531 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.4 |
not treated | [WTS] [JSN] |
S5-174249 | pCR 28.531 Adding content of scope | pCR | Huawei | 28.531 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.4 |
not treated | [WTS] [JSN] |
S5-174250 | pCR 28.802 Add use cases to support management for gNB with functional split |
pCR revised to S5-174408 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174251 | pCR 28.802 Add potential solution for NR management |
pCR revised to S5-174409 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174252 | pCR 28.802 Add conclusion and recommendation for NR management |
pCR revised to S5-174410 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174253 | pCR 28.802 Add use cases to support management for AMF Set |
pCR revised to S5-174419 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174254 | pCR 28.802 Add potential solution for AMF Set management |
pCR revised to S5-174420 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174255 | pCR 28.802 add potential solution of SON for New RAN |
pCR revised to S5-174422 |
Nokia, Cisco Systems, Inc., Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174256 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N |
pCR revised to S5-174416 |
China Mobile Com. Corporation | 32.88 0.6.0 | FS_IMP_ITFN | Rel-15 |
S5-114 AI: 6.6.1 |
revised | [WTS] [JSN] |
S5-174257 | pCR TR 32.871 adding the deployment use case |
pCR revised to S5-174451 |
China Mobile | 32.871 0.1.0 | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
revised | [WTS] [JSN] |
S5-174258 | pCR TR 32.871 adding the deployment requirements |
pCR revised to S5-174452 |
China Mobile M2M Company Ltd. | 32.871 0.1.0 | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
revised | [WTS] [JSN] |
S5-174259 | pCR TR 32.871 adding the policy operation requirements |
pCR revised to S5-174453 |
China Mobile M2M Company Ltd. | 32.871 0.1.0 | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
revised | [WTS] [JSN] |
S5-174260 | pCR TR 32.871 adding the general process |
pCR revised to S5-174454 |
China Mobile M2M Company Ltd. | 32.871 0.1.0 | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
revised | [WTS] [JSN] |
S5-174261 | pCR TR 32.871 modification on the concept | pCR | China Mobile M2M Company Ltd. | 32.871 0.1.0 | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
approved | [WTS] [JSN] |
S5-174262 | pCR TR 32.864 Add UC on depoyment of non-virtualized part of gNB based on the available non-virualized resource |
pCR revised to S5-174436 |
China Mobile M2M Company Ltd. | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174263 | pCR 32.864 Add UC on instantiation of virtualized part of a gNB with the concrete NFVI-POP information |
pCR revised to S5-174438 |
China Mobile M2M Company Ltd. | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174264 | CR 32.101 Addition of management functions and entities | CR | Ericsson | 32.101 14.0.0 CR#67 catC | TEI15 | Rel-15 |
S5-114 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-174265 | WI Summary the management of mobile network which inlcudes virtualzied network functions | WI status report | China Mobile M2M Company Ltd. | OAM14-MAMO_VNF |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | ||
S5-174266 | R15 pCR 28404-000 Introduction and scope for QoE collection |
pCR revised to S5-174357 |
Ericsson | 28.404 0.0.0 | QOED | Rel-15 |
S5-114 AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-174267 | R15 pCR 28404-000 Use cases and requirement for QoE collection |
pCR revised to S5-174358 |
Ericsson | 28.404 0.0.0 | QOED | Rel-15 |
S5-114 AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-174268 | Support EUTRAN new sharing arrangement |
CR revision of S5-174208 revised to S5-174337 |
Ericsson Inc. | 28.658 14.0.0 CR#191 catB | TEI14 | Rel-14 |
S5-114 AI: 6.3 |
revised | [WTS] [JSN] |
S5-174269 | Support EUTRAN sharing enhancement |
CR revision of S5-174207 revised to S5-174338 |
Ericsson Inc. | 28.659 14.1.0 CR#201 catB | TEI14 | Rel-14 |
S5-114 AI: 6.3 |
revised | [WTS] [JSN] |
S5-174270 | pCR 28.801 proposal for handling editor’s notes in clause 4 |
pCR revised to S5-174365 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174271 | pCR 28.801 clarification on use case management data isolation in 5.1.7 | pCR | Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] |
S5-174272 | pCR 28.801 proposal for handling editor’s notes in clause 5.1 |
pCR revised to S5-174366 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174273 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 |
pCR revised to S5-174368 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174274 | pCR 28.801 proposal for handling editor’s notes in clause 6.2 |
pCR revised to S5-174390 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174275 | pCR 28.801 proposal for handling editor’s notes in clause 7.1, 7.2 and 7.3 |
pCR revised to S5-174391 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174276 | pCR 28.801 proposal for handling editor’s notes in 7.4 7.9 7.13 and 7.14 |
pCR revised to S5-174392 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174277 | pCR 28.801 Clarify terminology customer service in relation to network slice |
pCR revised to S5-174393 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174278 | pCR 28.801 add conclusions and recommendations |
pCR revised to S5-174395 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174279 | Presentation of 28.801 to SA for approval | TS or TR cover | Ericsson Limited | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] | |
S5-174280 | Sequence proposal for network slicing agenda point 6.6.3 | discussion | Ericsson Limited |
S5-114 AI: 6.6.3 |
noted | [WTS] [JSN] | |||
S5-174281 | S5-174xxx Sequence proposal for network slicing agenda point 6.5.3 | discussion | Ericsson Limited |
S5-114 AI: 6.5.3 |
withdrawn | [WTS] [JSN] | |||
S5-174282 | Sequence proposal for network slicing agenda point 6.5.3 | discussion | Ericsson Limited |
S5-114 AI: 6.5.3 |
noted | [WTS] [JSN] | |||
S5-174283 | pCR 32.899 Key Issue Triggers and reporting in the separate SMF and UPF - Registration procedure |
pCR revised to S5-174372 |
Ericsson | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174284 | pCR 28.802 Update the usage of terminology of “NF” and “NF instance” |
pCR revised to S5-174407 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174285 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - UPF usage monitoring |
pCR revised to S5-174373 |
Ericsson | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174286 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - Continuous time |
pCR revised to S5-174374 |
Ericsson | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-174287 | Presentation of 28.802 to SA for information | TS or TR cover | Nokia, Alcatel-Lucent Shanghai Bell | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] | |
S5-174288 | pCR 28.802 Update 5GC NRM solution |
pCR revised to S5-174421 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174289 | Reply to LS from SA2 to SA5 on Support of NR using Dual Connectivity using EPC |
LS out LS To: 3GPP SA2 revised to S5-174300 |
Nokia | EDCE5-CH | Rel-15 |
S5-114 AI: 7.4.2 |
revised | [WTS] [JSN] | |
S5-174290 | pCR TR 32.870 key issues set 2 | pCR | Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.1.0 | FS_FWDCA | Rel-15 |
S5-114 AI: 7.5.2 |
approved | [WTS] [JSN] |
S5-174291 | pCR TR 32.870 solutions introduction | pCR | Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.1.0 | FS_FWDCA | Rel-15 |
S5-114 AI: 7.5.2 |
approved | [WTS] [JSN] |
S5-174292 | TDocs sequence proposal for 6.2 | discussion | ORANGE, Huawei |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-174293 | LS from SA3 cc SA5 Reply LS on Security for T8 interface | LS in | S3-172076 |
S5-114 AI: 7.4.3 |
postponed | [WTS] [JSN] | |||
S5-174294 | Preparation of SA2-SA5 discussion on slicing | discussion | Huawei | Rel-15 |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | ||
S5-174295 | LS from MEF Forum to SA5 on MEF Forum Work on 5G | LS in | MEF Forum |
S5-114 AI: 5.3 |
postponed | [WTS] [JSN] | |||
S5-174296 | Rel-15 CR 32.101 Replacement of 3G term |
CR revised to S5-174339 |
Huawei | 32.101 14.0.0 CR#68 catF | TEI15 | Rel-15 |
S5-114 AI: 6.3 |
revised | [WTS] [JSN] |
S5-174297 | LS reply to ATIS NRSC on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” |
LS out LS is reply to S5-174065 LS To: ATIS NRSC revised to S5-174331 |
ORANGE | Rel-15 |
S5-114 AI: 6.1 |
revised | [WTS] [JSN] | ||
S5-174298 | Reply to: Resubmitted LS from SA2 to SA5 on Stage 2 completion on introduction of WLAN as alternative technology for ProSe Direct Discovery |
LS out LS is reply to S5-174063 LS To: SA2 |
Ericsson |
S5-114 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-174299 | Reply to: LS from SA2 to SA5 on Request to update maximum data rate values in EPS |
LS out LS is reply to S5-174049 LS To: SA2 |
Ericsson |
S5-114 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-174300 | Reply to LS from SA2 to SA5 on Support of NR using Dual Connectivity using EPC |
LS out LS To: 3GPP SA2 revision of S5-174289 |
Nokia | EDCE5-CH | Rel-15 |
S5-114 AI: 7.4.2 |
approved | [WTS] [JSN] | |
S5-174301 | Reply to: LS from SA2 to SA5 on standardization of Northbound SCEF API Charging |
LS out LS is reply to S5-174048 LS To: SA2 revision of S5-174232 |
Huawei |
S5-114 AI: 7.4.3 |
approved | [WTS] [JSN] | |||
S5-174302 | Reply to: Response LS from SA6 to SA5 on standardization of Northbound SCEF API Charging |
LS out LS is reply to S5-174084 LS To: SA6 |
Huawei |
S5-114 AI: 7.4.3 |
approved | [WTS] [JSN] | |||
S5-174303 | Rel-15 CR 32.251 Charging enhancement for eFMSS |
CR revision of S5-174234 |
China Telecom Corporation Ltd. | 32.251 14.3.0 CR#4981 catB | eFMSS_CH | Rel-15 |
S5-114 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-174304 | Rel-15 CR 32.298 Charging enhancement for eFMSS |
CR revision of S5-174236 |
China Telecom Corporation Ltd. | 32.298 14.3.0 CR#6431 catB | eFMSS_CH | Rel-15 |
S5-114 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-174305 | Rel-15 CR 32.299 Charging enhancement for eFMSS |
CR revision of S5-174237 |
China Telecom Corporation Ltd. | 32.299 14.4.0 CR#7891 catB | eFMSS_CH | Rel-15 |
S5-114 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-174306 | Rel-15 pCR 32.254 Update of the skeleton |
pCR revision of S5-174228 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.254 0.0.0 | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
approved | [WTS] [JSN] |
S5-174307 | Rel-15 pCR 32.254 Scope and Reference |
pCR revision of S5-174229 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.254 0.0.0 | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
approved | [WTS] [JSN] |
S5-174308 | Rel-15 pCR 32.254 Definitions, Symbols and Abbreviations |
pCR revision of S5-174230 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.254 0.0.0 | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
approved | [WTS] [JSN] |
S5-174309 | Rel-15 pCR 32.254 Architecture considerations |
pCR revision of S5-174231 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.254 0.0.0 | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
approved | [WTS] [JSN] |
S5-174310 | Rel-14 CR 32.298 Addition of FE Identifier List to IMS Charging |
CR revision of S5-174087 |
Deutsche Telekom AG | 32.298 14.3.0 CR#6413 catB | CH14-DCCII | Rel-14 |
S5-114 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-174311 | pCR 32.869 Update of Problems and Goals |
pCR revision of S5-174134 |
Ericsson | 32.869 0.5.0 | FS_DOCME | Rel-14 |
S5-114 AI: 7.5.1 |
approved | [WTS] [JSN] |
S5-174312 | pCR 32.869 Update of Introduction |
pCR revision of S5-174135 |
Ericsson | 32.869 0.5.0 | FS_DOCME | Rel-14 |
S5-114 AI: 7.5.1 |
approved | [WTS] [JSN] |
S5-174313 | pCR 32.869 Update of Offline Part |
pCR revision of S5-174136 |
Ericsson | 32.869 0.5.0 | FS_DOCME | Rel-14 |
S5-114 AI: 7.5.1 |
approved | [WTS] [JSN] |
S5-174314 | pCR TR 32.870 Refinement on existing Application and Diameter description |
pCR revision of S5-174233 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.1.0 | FS_FWDCA | Rel-15 |
S5-114 AI: 7.5.2 |
approved | [WTS] [JSN] |
S5-174315 | pCR TR 32.870 Introduction of key issues |
pCR revision of S5-174235 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.87 0.1.0 | FS_FWDCA | Rel-15 |
S5-114 AI: 7.5.2 |
approved | [WTS] [JSN] |
S5-174316 | pCR TR 32.899 Roaming |
pCR revision of S5-174132 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174317 | pCR TR 32.899 Online and Offline Charging evaluation |
pCR revision of S5-174133 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174318 | Rel-15 pCR 32.899 Introduce Service Based architecture topic |
pCR revision of S5-174222 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174319 | Rel-15 pCR 32.899 Network Slicing for Tenant Based Charging |
pCR revision of S5-174223 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174320 | Rel-15 pCR 32.899 Network Capability Exposure of Charging System |
pCR revision of S5-174224 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174321 | Rel-15 pCR 32.899 Charging for Interworking between 5G System and Existing Systems |
pCR revision of S5-174225 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174322 | Reply to: LS from ETSI TC LI on Request of updated information on SA5 standards or reports related to billing systems and parameters for 5G access and services |
LS out LS is reply to S5-174073 LS To: ETSI TC LI |
Nokia |
S5-114 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-174323 | pCR 32.848 Skeleton update |
pCR revision of S5-174211 |
China Mobile Com. Corporation | 32.848 0.0.0 | FS_VBCLTE | Rel-15 |
S5-114 AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-174324 | pCR 32.848 Refrence |
pCR revision of S5-174212 |
China Mobile Com. Corporation | 32.848 0.0.0 | FS_VBCLTE | Rel-15 |
S5-114 AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-174325 | draft TR 32.848 | draft TR | China Mobile Com. Corporation | FS_VBCLTE | Rel-15 |
S5-114 AI: 7.5.4 |
approved | [WTS] [JSN] | |
S5-174326 | draft TR 32.870 | draft TR | Nokia, Alcatel-Lucent Shanghai Bell | FS_FWDCA | Rel-15 |
S5-114 AI: 7.5.2 |
approved | [WTS] [JSN] | |
S5-174327 | draft TR 32.869 | draft TR | Ericsson | FS_DOCME | Rel-15 |
S5-114 AI: 7.5.1 |
approved | [WTS] [JSN] | |
S5-174328 | Time Plan for OAM&P |
other revision of S5-174004 |
WG Vice Chair (Huawei) |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-174329 | Reply to: LS from BBF to SA5 on Cooperation on Network Slicing |
LS out LS is reply to S5-174085 LS To: Broadband Forum (BBF) revised to S5-174382 |
Huawei |
S5-114 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-174330 | Report 5G management architecture WID planning conference call |
report revision of S5-174070 |
OAM&P SWG chairman | Rel-15 |
S5-114 AI: 6.2 |
approved | [WTS] [JSN] | ||
S5-174331 | LS reply to ATIS NRSC on ”Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network” |
LS out LS is reply to S5-174065 LS To: ATIS NRSC revision of S5-174297 |
ORANGE | Rel-15 |
S5-114 AI: 6.1 |
approved | [WTS] [JSN] | ||
S5-174332 | LSOut reply to 3GPP SA5 on progress of measurement definitions | LS in | ESI NFV |
S5-114 AI: 6.4.1.1 |
noted | [WTS] [JSN] | |||
S5-174333 | LSOut reply to 3GPP SA5 on Managing EM IP address provided to VNF | LS in | ETSI NFV |
S5-114 AI: 6.3 |
noted | [WTS] [JSN] | |||
S5-174334 | Organization of future 5G WIDs | discussion | Huawei |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-174335 | new WID on SON for AAS deployment management |
WID new revision of S5-174240 |
Nokia, Alcatel-Lucent Shanghai Bell | Rel-15 |
S5-114 AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-174336 | CR 32.865 clarify management and control functionalities |
CR revision of S5-174239 |
Nokia, Alcatel-Lucent Shanghai Bell | 32.865 15.0.0 CR#11 catF | FS_OAM_SON_AAS | Rel-15 |
S5-114 AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-174337 | Support EUTRAN new sharing arrangement |
CR revision of S5-174268 |
Ericsson Inc. | 28.658 14.0.0 CR#192 catB | TEI14 | Rel-14 |
S5-114 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-174338 | Support EUTRAN sharing enhancement |
CR revision of S5-174269 |
Ericsson Inc. | 28.659 14.1.0 CR#202 catB | TEI14 | Rel-14 |
S5-114 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-174339 | Rel-15 CR 32.101 Replacement of 3G term |
CR revision of S5-174296 |
Huawei | 32.101 14.0.0 CR#681 catF | TEI15 | Rel-15 |
S5-114 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-174340 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR |
CR revision of S5-174126 revised to S5-174412 |
Intel Corporation (UK) Ltd | 32.401 14.1.1 CR#401 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
revised | [WTS] [JSN] |
S5-174341 | CR TS 32.409 Add VR related measurements for IMS NFs |
CR revision of S5-174128 revised to S5-174460 |
Intel Corporation (UK) Ltd | 32.409 14.0.0 CR#611 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
revised | [WTS] [JSN] |
S5-174342 | CR TS 32.426 Add VR related measurements for EPC NFs |
CR revision of S5-174129 revised to S5-174461 |
Intel Corporation (UK) Ltd | 32.426 14.0.0 CR#661 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
revised | [WTS] [JSN] |
S5-174343 | pCR 28.304 Update with correct TS numbers and titles |
pCR revision of S5-174043 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-174344 | Draft TS 28.305 | draft TS | ORANGE | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] | |
S5-174345 | Draft TS 28.304 | draft TS | ORANGE | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] | |
S5-174346 | pCR TS 28.304 Add justification for the two options |
pCR revision of S5-174054 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-174347 | pCR TS 28.304 High-level use case and business level reqs for supervising PEE related alarms |
pCR revision of S5-174055 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-174348 | Process for management of draft TSs/TRs |
other revision of S5-174013 |
WG Chairman |
S5-114 AI: 5.1 |
approved | [WTS] [JSN] | |||
S5-174349 | New SID Study on introducing intelligence in management of 3GPP network |
SID new revision of S5-174138 |
Huawei | Rel-15 |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-174350 | Reply to: Response LS from SA2 to SA5 on progress of Network Slicing related work |
LS out LS is reply to S5-174072 LS To: SA2 revision of S5-174183 |
Huawei | Rel-15 |
S5-114 AI: 6.1 |
approved | [WTS] [JSN] | ||
S5-174351 | pCR TS 28.304 High-level use case and business level reqs for monitoring PEE configuration changes |
pCR revision of S5-174056 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-174352 | pCR TS 28.304 Specification-level requirements for Option No. 1 |
pCR revision of S5-174057 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-174353 | pCR TS 28.304 Specification-level requirements for Option No. 2 |
pCR revision of S5-174058 |
ORANGE | 28.304 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-174354 | pCR TS 28.305 Structuring clauses 5 and 6 for introducing the two options |
pCR revision of S5-174059 |
ORANGE | 28.305 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-174355 | pCR TS 28.305 Input to information model for Option 2 |
pCR revision of S5-174060 |
ORANGE | 28.305 0.1.0 | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-174356 | TS 28.306 Skeleton |
draft TS revision of S5-174061 |
ORANGE | PEE_CMON | Rel-15 |
S5-114 AI: 6.5.1 |
approved | [WTS] [JSN] | |
S5-174357 | R15 pCR 28404-000 Introduction and scope for QoE collection |
pCR revision of S5-174266 |
Ericsson | 28.404 0.0.0 | QOED | Rel-15 |
S5-114 AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-174358 | R15 pCR 28404-000 Use cases and requirement for QoE collection |
pCR revision of S5-174267 |
Ericsson | 28.404 0.0.0 | QOED | Rel-15 |
S5-114 AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-174359 | pCR TS 28.530 Introduction and scope for network slicing in mobile networks |
pCR revision of S5-174042 |
Ericsson LM | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-174360 | pCR 28.530 Add network slice definitions | pCR | Huawei, Ericsson | 28.53 0.0.0 | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
withdrawn | [WTS] [JSN] |
S5-174361 | pCR to 28.801 NSSI role |
pCR revision of S5-174094 |
Cisco Systems Inc. | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174362 | pCR to 28.801 Definitions |
pCR revision of S5-174095 revised to S5-174467 |
Cisco Systems Inc. | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174363 | pCR to 28.801 SON Clarification |
pCR revision of S5-174096 |
Cisco Systems Inc. | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174364 | Draft TR 28.801 | draft TR | Ericsson | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] | |
S5-174365 | pCR 28.801 proposal for handling editor’s notes in clause 4 |
pCR revision of S5-174270 revised to S5-174468 |
Ericsson Limited,Huawei, China Unicom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174366 | pCR 28.801 proposal for handling editor’s notes in clause 5.1 |
pCR revision of S5-174272 |
Ericsson Limited, Huawei | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174367 | breakout session conclusion for managed slice definition | discussion | Huawei |
S5-114 AI: 6.5.3 |
noted | [WTS] [JSN] | |||
S5-174368 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 |
pCR revision of S5-174273 revised to S5-174369 |
Huawei, China Unicom, Ericsson, SK Telecom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174369 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 |
pCR revision of S5-174368 revised to S5-174469 |
Huawei, China Unicom, Ericsson | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174370 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Quota Management |
pCR revision of S5-174226 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174371 | Rel-15 pCR 32.899 Interaction between SMF and UPF for Parallel Traffic |
pCR revision of S5-174227 |
HUAWEI TECHNOLOGIES Co. Ltd. | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174372 | pCR 32.899 Key Issue Triggers and reporting in the separate SMF and UPF - Registration procedure |
pCR revision of S5-174283 |
Ericsson | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174373 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - UPF usage monitoring |
pCR revision of S5-174285 |
Ericsson | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174374 | pCR 32.899 Key Issue Quota management in the separate SMF and UPF - Continuous time |
pCR revision of S5-174286 |
Ericsson | 32.899 0.2.0 | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-174375 | Updated Work Plan for Study TR 32.899 |
discussion revision of S5-174221 |
HUAWEI TECHNOLOGIES Co. Ltd. | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
noted | [WTS] [JSN] | |
S5-174376 | draft TR 32.899 | draft TR | HUAWEI TECHNOLOGIES Co. Ltd. | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] | |
S5-174377 | Presentation of draft TR 32.899 to SA#77 for information | TS or TR cover | HUAWEI TECHNOLOGIES Co. Ltd. | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] | |
S5-174378 | LS to SA2 and CT4 on 5G Charging Study Phase 1 on N4 |
LS out LS To: SA2,CT4 |
Ericsson |
S5-114 AI: 7.5.3 |
approved | [WTS] [JSN] | |||
S5-174379 | Update "Study on Charging Aspects of 5G System Architecture Phase 1" |
SID revised revised to S5-174389 |
HUAWEI TECHNOLOGIES Co. Ltd. | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
revised | [WTS] [JSN] | |
S5-174380 | pCR TR 32.868 Add UC on provisioning WLAN informaton to WT for non-collocated LWA |
pCR revision of S5-174123 |
Intel Corporation (UK) Ltd | 32.868 0.1.0 | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
approved | [WTS] [JSN] |
S5-174381 | pCR TR 32.868 Add UC on management of relation between eNB and WT for non-collocated LWA |
pCR revision of S5-174124 |
Intel Corporation (UK) Ltd | 32.868 0.1.0 | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
noted | [WTS] [JSN] |
S5-174382 | Reply to: LS from BBF to SA5 on Cooperation on Network Slicing |
LS out LS is reply to S5-174085 LS To: Broadband Forum (BBF) revision of S5-174329 |
Huawei |
S5-114 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-174383 | Minutes of Study on OAM aspects of LTE and WLAN integration |
report revision of S5-174034 |
Rapporteur (Intel) |
S5-114 AI: 6.6.9 |
noted | [WTS] [JSN] | |||
S5-174384 | Exception sheet Performance management for mobile networks that include virtualized network functions | WI exception request | Intel | OAM14-MAMO_VNF-PM |
S5-114 AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] | ||
S5-174385 | Draft TS 28.404 | draft TS | Ericsson | QOED | Rel-15 |
S5-114 AI: 6.5.2 |
approved | [WTS] [JSN] | |
S5-174386 | Draft TS 28.530 | draft TS | Ericsson | NETSLICE | Rel-15 |
S5-114 AI: 6.5.3 |
approved | [WTS] [JSN] | |
S5-174387 | Draft TR 28.800 | draft TR | Huawei | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
approved | [WTS] [JSN] | |
S5-174388 | Draft TR 28.802 | draft TR | Nokia | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] | |
S5-174389 | Update "Study on Charging Aspects of 5G System Architecture Phase 1" |
SID revised revision of S5-174379 |
HUAWEI TECHNOLOGIES Co. Ltd. | FS_5GS_Ph1_CH | Rel-15 |
S5-114 AI: 7.5.3 |
agreed | [WTS] [JSN] | |
S5-174390 | pCR 28.801 proposal for handling editor’s notes in clause 6.2 |
pCR revision of S5-174274 |
Ericsson Limited,Huawei,China Unicom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174391 | pCR 28.801 proposal for handling editor’s notes in clause 7.1, 7.2 and 7.3 |
pCR revision of S5-174275 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174392 | pCR 28.801 proposal for handling editor’s notes in 7.4 7.9 7.13 and 7.14 |
pCR revision of S5-174276 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174393 | pCR 28.801 Clarify terminology customer service in relation to network slice |
pCR revision of S5-174277 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174394 | Document sequence | other | Nokia |
S5-114 AI: 6.6.4 |
noted | [WTS] [JSN] | |||
S5-174395 | pCR 28.801 add conclusions and recommendations |
pCR revision of S5-174278 revised to S5-174470 |
Ericsson Limited | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
revised | [WTS] [JSN] |
S5-174396 | pCR 28.800 Key issues to be considered for 5G management architecture options |
pCR revision of S5-174174 revised to S5-174463 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174397 | pCR 28.800 Considerations on the 5G NF management standard interfaces |
pCR revision of S5-174175 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
approved | [WTS] [JSN] |
S5-174398 | OAM&P SWG action list |
other revision of S5-174027 |
WG Vice Chair (Huawei) |
S5-114 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-174399 | pCR 28.800 Add use case of management and orchestration architecture for management of communication service |
pCR revision of S5-174176 revised to S5-174464 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174400 | pCR 28.800 Add requirement for management and orchestration of networks containing non-5G NE and 5G NE |
pCR revision of S5-174177 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
approved | [WTS] [JSN] |
S5-174401 | pCR 28.800 Mapping requirements between 5G management architecture and NFV-MANO architecture |
pCR revision of S5-174179 revised to S5-174466 |
Huawei,SK Telekom | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174402 | pCR 28.800 Use case of multi-operator service support with management data |
pCR revision of S5-174180 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
approved | [WTS] [JSN] |
S5-174403 | pCR 28.800 Interface for service management |
pCR revision of S5-174181 revised to S5-174465 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
revised | [WTS] [JSN] |
S5-174404 | pCR 28.800 Concept of infrastructure management function |
pCR revision of S5-174182 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
noted | [WTS] [JSN] |
S5-174405 | Sequence proposal | other | Intel |
S5-114 AI: 6.6.7 |
noted | [WTS] [JSN] | |||
S5-174406 | PCR 28.800 Add service management model definition | pCR | Nokia, Alcatel-Lucent Shanghai Bell | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
withdrawn | [WTS] [JSN] |
S5-174407 | pCR 28.802 Update the usage of terminology of “NF” and “NF instance” |
pCR revision of S5-174284 revised to S5-174476 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174408 | pCR 28.802 Add use cases to support management for gNB with functional split |
pCR revision of S5-174250 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] |
S5-174409 | pCR 28.802 Add potential solution for NR management |
pCR revision of S5-174251 revised to S5-174472 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174410 | pCR 28.802 Add conclusion and recommendation for NR management |
pCR revision of S5-174252 revised to S5-174473 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174411 | pCR 28.802 Introduction of edge computing management |
pCR revision of S5-174199 revised to S5-174471 |
Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174412 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR |
CR revision of S5-174340 revised to S5-174458 |
Intel Corporation (UK) Ltd | 32.401 14.1.1 CR#402 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
revised | [WTS] [JSN] |
S5-174413 | New WID on Fault supervision of network slicing for 5G networks and services |
WID new revision of S5-174209 |
ZTE Corporation |
S5-114 AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-174414 | pCR 28.802 Management of 5GC NFs supporting edge computing |
pCR revision of S5-174200 |
Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] |
S5-174415 | pCR 28.802 Management of edge computing AFs |
pCR revision of S5-174201 |
Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
noted | [WTS] [JSN] |
S5-174416 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N |
pCR revision of S5-174256 revised to S5-174462 |
China Mobile Com. Corporation | 32.88 0.6.0 | FS_IMP_ITFN | Rel-15 |
S5-114 AI: 6.6.1 |
revised | [WTS] [JSN] |
S5-174417 | pCR 28.802 Management of edge computing services |
pCR revision of S5-174202 |
Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
noted | [WTS] [JSN] |
S5-174418 | pCR 28.802 Update solution of configuration management of 5GC | pCR | Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
withdrawn | [WTS] [JSN] |
S5-174419 | pCR 28.802 Add use cases to support management for AMF Set |
pCR revision of S5-174253 revised to S5-174474 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174420 | pCR 28.802 Add potential solution for AMF Set management |
pCR revision of S5-174254 revised to S5-174475 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
revised | [WTS] [JSN] |
S5-174421 | pCR 28.802 Update 5GC NRM solution |
pCR revision of S5-174288 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] |
S5-174422 | pCR 28.802 add potential solution of SON for New RAN |
pCR revision of S5-174255 |
Nokia, Cisco Systems, Inc., Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
noted | [WTS] [JSN] |
S5-174423 | Draft TR 32.857 | draft TR | Cisco | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
approved | [WTS] [JSN] | |
S5-174424 | pCR to 32.857 Handover related measurements |
pCR revision of S5-174217 |
Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
approved | [WTS] [JSN] |
S5-174425 | Cover sheet TR 32.866 | TS or TR cover | Nokia | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] | |
S5-174426 | SID revision Study on IoT Management |
SID revised revision of S5-174098 |
Cisco Systems Inc. | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
agreed | [WTS] [JSN] | |
S5-174427 | pCR 32.866 Add REST design principles |
pCR revision of S5-174168 |
Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] |
S5-174428 | pCR 32.866 Add HTTP method descriptions |
pCR revision of S5-174170 |
Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] |
S5-174429 | pCR 32.866 Discussion of REST implementation levels |
pCR revision of S5-174147 |
Huawei | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] |
S5-174430 | pCR 32.866 Discussion of options for resource identification |
pCR revision of S5-174148 |
Huawei | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] |
S5-174431 | Draft TR 32.866 | draft TR | Nokia | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] | |
S5-174432 | pCR 32.866 Discussion of options for asynchronous operations |
pCR revision of S5-174149 |
Huawei | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] |
S5-174433 | pCR 32.866 Add design patterns |
pCR revision of S5-174172 |
Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] |
S5-174434 | pCR 32.866 Clarify mapping of the Alarm IRP |
pCR revision of S5-174173 |
Nokia Germany | 32.866 0.2.0 | FS_OAM_RESTFUL | Rel-15 |
S5-114 AI: 6.6.6 |
approved | [WTS] [JSN] |
S5-174435 | pCR TR 32 864 Add UC on validation of NsDf for a NSD |
pCR revision of S5-174119 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] |
S5-174436 | pCR TR 32.864 Add UC on depoyment of non-virtualized part of gNB based on the available non-virualized resource |
pCR revision of S5-174262 |
China Mobile M2M Company Ltd. | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] |
S5-174437 | pCR to 32.857 Paging related measurements |
pCR revision of S5-174220 |
Cisco Systems Inc. | 32.857 0.3.0 | FS_OAM_IOT | Rel-15 |
S5-114 AI: 6.6.5 |
approved | [WTS] [JSN] |
S5-174438 | pCR 32.864 Add UC on instantiation of virtualized part of a gNB with the concrete NFVI-POP information |
pCR revision of S5-174263 |
China Mobile M2M Company Ltd. | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] |
S5-174439 | pCR TR 32.864 Add gap analysis on adding, deleting and replacing the non-virtualized part of gNB |
pCR revision of S5-174109 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] |
S5-174440 | pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB |
pCR revision of S5-174111 revised to S5-174478 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174441 | pCR TR 32.864 Add potential solution for establishing relation between the CN NF and the gNB |
pCR revision of S5-174112 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
noted | [WTS] [JSN] |
S5-174442 | pCR TR 32.864 Add potential solutions to support partially virtualized NF under NFV concept |
pCR revision of S5-174107 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
noted | [WTS] [JSN] |
S5-174443 | pCR TR 32.864 Add potential solution for instantiating NS containing CN VNF and gNB |
pCR revision of S5-174113 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] |
S5-174444 | pCR TR 32.864 Add potential solution for updating transport network requirements |
pCR revision of S5-174114 revised to S5-174479 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174445 | pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB |
pCR revision of S5-174115 revised to S5-174480 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174446 | pCR TR 32.864 Add conclusions |
pCR revision of S5-174120 revised to S5-174481 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
revised | [WTS] [JSN] |
S5-174447 | pCR TR 32.864 Add Recommendations |
pCR revision of S5-174121 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] |
S5-174448 | pCR 32.867 Add potential solution for PGW and SGW related measurements in CUPS |
pCR revision of S5-174143 |
Huawei | 32.867 0.3.0 | FS_MECUPS | Rel-14 |
S5-114 AI: 6.6.8 |
approved | [WTS] [JSN] |
S5-174449 | pCR TR 32.868 Add LWA overview and concept |
pCR revision of S5-174122 revised to S5-174484 |
Intel Corporation (UK) Ltd | 32.868 0.1.0 | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
revised | [WTS] [JSN] |
S5-174450 | pCR TR 32.868 Add UC on provisioning WLAN informaton to eNB for collocated LWA |
pCR revision of S5-174125 |
Intel Corporation (UK) Ltd | 32.868 0.1.0 | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
approved | [WTS] [JSN] |
S5-174451 | pCR TR 32.871 adding the deployment use case |
pCR revision of S5-174257 |
China Mobile | 32.871 0.1.0 | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
approved | [WTS] [JSN] |
S5-174452 | pCR TR 32.871 adding the deployment requirements |
pCR revision of S5-174258 |
China Mobile M2M Company Ltd. | 32.871 0.1.0 | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
approved | [WTS] [JSN] |
S5-174453 | pCR TR 32.871 adding the policy operation requirements |
pCR revision of S5-174259 |
China Mobile M2M Company Ltd. | 32.871 0.1.0 | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
approved | [WTS] [JSN] |
S5-174454 | pCR TR 32.871 adding the general process |
pCR revision of S5-174260 |
China Mobile M2M Company Ltd. | 32.871 0.1.0 | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
approved | [WTS] [JSN] |
S5-174455 | Draft TR 32.871 | draft TR | China Mobile | FS_NETPOL | Rel-16 |
S5-114 AI: 6.6. |
approved | [WTS] [JSN] | |
S5-174456 | TR 32.972 skeleton |
draft TR revision of S5-174066 |
ORANGE | FS_EE_5G | Rel-15 |
S5-114 AI: 6.6.11 |
approved | [WTS] [JSN] | |
S5-174457 | pCR TS 32.972 – About EE KPIs and metrics |
pCR revision of S5-174083 |
ORANGE | 32.972 0.0.0 | FS_EE_5G | Rel-15 |
S5-114 AI: 6.6.11 |
approved | [WTS] [JSN] |
S5-174458 | CR TS 32.401 Update concept and collection method for 3GPP NF performance measurements related to VR |
CR revision of S5-174412 |
Intel Corporation (UK) Ltd | 32.401 14.1.1 CR#403 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
available | [WTS] [JSN] |
S5-174459 | CR TS 32.404 Add new collection method for 3GPP NF performance measurements related to VR |
CR revision of S5-174127 |
Intel Corporation (UK) Ltd | 32.404 14.0.0 CR#131 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
available | [WTS] [JSN] |
S5-174460 | CR TS 32.409 Add VR related measurements for IMS NFs |
CR revision of S5-174341 |
Intel Corporation (UK) Ltd | 32.409 14.0.0 CR#612 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
available | [WTS] [JSN] |
S5-174461 | CR TS 32.426 Add VR related measurements for EPC NFs |
CR revision of S5-174342 |
Intel Corporation (UK) Ltd | 32.426 14.0.0 CR#662 catB | OAM14-MAMO_VNF-PM | Rel-14 |
S5-114 AI: 6.4.1.1 |
available | [WTS] [JSN] |
S5-174462 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N |
pCR revision of S5-174416 revised to S5-174487 |
China Mobile Com. Corporation | 32.88 0.6.0 | FS_IMP_ITFN | Rel-15 |
S5-114 AI: 6.6.1 |
revised | [WTS] [JSN] |
S5-174463 | pCR 28.800 Key issues to be considered for 5G management architecture options |
pCR revision of S5-174396 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
approved | [WTS] [JSN] |
S5-174464 | pCR 28.800 Add use case of management and orchestration architecture for management of communication service |
pCR revision of S5-174399 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
approved | [WTS] [JSN] |
S5-174465 | pCR 28.800 Interface for service management |
pCR revision of S5-174403 |
Huawei | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
approved | [WTS] [JSN] |
S5-174466 | pCR 28.800 Mapping requirements between 5G management architecture and NFV-MANO architecture |
pCR revision of S5-174401 |
Huawei,SK Telekom | 28.8 0.7.0 | FS_NGNS_MOA | Rel-15 |
S5-114 AI: 6.6.2 |
approved | [WTS] [JSN] |
S5-174467 | pCR to 28.801 Definitions |
pCR revision of S5-174362 |
Cisco Systems Inc. | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174468 | pCR 28.801 proposal for handling editor’s notes in clause 4 |
pCR revision of S5-174365 |
Ericsson Limited,Huawei, China Unicom | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174469 | pCR 28.801 proposal for handling editor’s notes in clause 5.2 |
pCR revision of S5-174369 |
Huawei, China Unicom, Ericsson | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174470 | pCR 28.801 add conclusions and recommendations |
pCR revision of S5-174395 |
Ericsson Limited,Huawei | 28.801 1.2.0 | FS_MONETS | Rel-15 |
S5-114 AI: 6.6.3 |
approved | [WTS] [JSN] |
S5-174471 | pCR 28.802 Introduction of edge computing management |
pCR revision of S5-174411 |
Huawei | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] |
S5-174472 | pCR 28.802 Add potential solution for NR management |
pCR revision of S5-174409 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] |
S5-174473 | pCR 28.802 Add conclusion and recommendation for NR management |
pCR revision of S5-174410 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
noted | [WTS] [JSN] |
S5-174474 | pCR 28.802 Add use cases to support management for AMF Set |
pCR revision of S5-174419 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] |
S5-174475 | pCR 28.802 Add potential solution for AMF Set management |
pCR revision of S5-174420 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] |
S5-174476 | pCR 28.802 Update the usage of terminology of “NF” and “NF instance” |
pCR revision of S5-174407 |
Nokia, Alcatel-Lucent Shanghai Bell | 28.802 0.7.0 | FS_MAN_NGNAF | Rel-15 |
S5-114 AI: 6.6.4 |
approved | [WTS] [JSN] |
S5-174477 | Draft TR 32.864 | draft TR | Intel | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] | |
S5-174478 | pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB |
pCR revision of S5-174440 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
noted | [WTS] [JSN] |
S5-174479 | pCR TR 32.864 Add potential solution for updating transport network requirements |
pCR revision of S5-174444 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] |
S5-174480 | pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB |
pCR revision of S5-174445 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] |
S5-174481 | pCR TR 32.864 Add conclusions |
pCR revision of S5-174446 |
Intel Corporation (UK) Ltd | 32.864 0.4.0 | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] |
S5-174482 | Presentation sheet TR 32.864 for information | TS or TR cover | Intel | FS_MA_RNVNF | Rel-15 |
S5-114 AI: 6.6.7 |
approved | [WTS] [JSN] | |
S5-174483 | Draft TR 32.867 | draft TR | Huawei | FS_MECUPS | Rel-15 |
S5-114 AI: 6.6.8 |
approved | [WTS] [JSN] | |
S5-174484 | pCR TR 32.868 Add LWA overview and concept |
pCR revision of S5-174449 |
Intel Corporation (UK) Ltd | 32.868 0.1.0 | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
approved | [WTS] [JSN] |
S5-174485 | Draft TR 32.868 | draft TR | Intel | FS_OAM_LWI | Rel-15 |
S5-114 AI: 6.6.9 |
approved | [WTS] [JSN] | |
S5-174486 | Draft TR 32.972 | draft TR | ORANGE | FS_EE_5G | Rel-15 |
S5-114 AI: 6.6.11 |
approved | [WTS] [JSN] | |
S5-174487 | pCR TR 32.880 Recommendation for IRP solution sets for Itf-N |
pCR revision of S5-174462 |
China Mobile Com. Corporation | 32.88 0.6.0 | FS_IMP_ITFN | Rel-15 |
S5-114 AI: 6.6.1 |
approved | [WTS] [JSN] |
S5-174488 | OAM Executive Report from THIS Meeting |
report revision of S5-174005 |
WG Vice Chair (Huawei) |
S5-114 AI: 6.1 |
available | [WTS] [JSN] | |||
S5-174489 | Draft TR 32.880 | draft TR | China Mobile | FS_IMP_ITFN | Rel-15 |
S5-114 AI: 6.6.1 |
approved | [WTS] [JSN] | |
S5-174490 | Draft TS 32.254 | draft TS | Huawei | NAPS-CH | Rel-15 |
S5-114 AI: 7.4.3 |
approved | [WTS] [JSN] |
491 documents (1.1055450439453 seconds)