Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R3-173465 | RAN3-97bis meeting Agenda | agenda | MCC |
R3-97 AI: 3 |
approved | [WTS] [JSN] | |||
R3-173466 | RAN3-97 Meeting report | report | MCC |
R3-97 AI: 4 |
approved | [WTS] [JSN] | |||
R3-173467 | Further Discussion on New QoS Impacts on MR-DC Messages Structure | discussion | ZTE Corporation |
R3-97 AI: 10.8.2.3 |
noted | [WTS] [JSN] | |||
R3-173468 | Correction of 38.423 Due to New QoS Impacts on MR-DC Messages Structure | pCR | ZTE Corporation | 38.423 0.2.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.2.3 |
withdrawn | [WTS] [JSN] |
R3-173469 | Correction of 37.340 for NW Slice | pCR | ZTE Corporation | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173470 | Correction of 38.423 for S-NSSAI Info Exchange | pCR | ZTE Corporation | 38.423 0.2.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173471 | NW Slice Temporarily Unavailable | discussion | ZTE Corporation |
R3-97 AI: 10.2.2 |
withdrawn | [WTS] [JSN] | |||
R3-173472 | Further Discussion on Xn Based HO Preparation in NG-RAN | discussion | ZTE Corporation |
R3-97 AI: 10.5.2 |
noted | [WTS] [JSN] | |||
R3-173473 | Correction of 38.423 about Xn Based HO Preparation in NG-RAN | pCR | ZTE Corporation | 38.423 0.2.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.5.2 |
not pursued | [WTS] [JSN] |
R3-173474 | Discussion on inter RAT HO path selection | discussion | ZTE Corporation |
R3-97 AI: 10.7.4 |
withdrawn | [WTS] [JSN] | |||
R3-173475 | Introduction of EN-DC in 36.425 | draftCR | ZTE Corporation | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
not pursued | [WTS] [JSN] | |
R3-173476 | EN-DC Relevant Updates Due to gNB-CU/DU Split | discussion | ZTE Corporation |
R3-97 AI: 10.8.1.3 |
withdrawn | [WTS] [JSN] | |||
R3-173477 | Further Discussion on DLUL SN RRC Message Transport | discussion | ZTE Corporation | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
not pursued | [WTS] [JSN] | |
R3-173478 | Correction of 38.423 for S-NODE MODIFICATION REQUIRED message | pCR | ZTE Corporation | 38.423 0.2.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.2.3 |
not pursued | [WTS] [JSN] |
R3-173479 | NGAP Impacts due to PDU Session Split over NG-U | discussion | ZTE Corporation |
R3-97 AI: 10.8.2.3 |
not pursued | [WTS] [JSN] | |||
R3-173480 | Correction of 38.413 for PDU Session Split over NG-U | pCR | ZTE Corporation | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.2.3 |
not pursued | [WTS] [JSN] |
R3-173481 | Correction of 38.413 about Session-AMBR for DC@5GC | pCR | ZTE Corporation | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.2.7 |
not pursued | [WTS] [JSN] |
R3-173482 | Correction of 38.423 about Session-AMBR for DC@5GC | pCR | ZTE Corporation | 38.423 0.2.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.2.7 |
not pursued | [WTS] [JSN] |
R3-173483 | Data Forwarding and In Sequence Lossless Delivery during HO | discussion | ZTE Corporation |
R3-97 AI: 10.5.5 |
noted | [WTS] [JSN] | |||
R3-173484 | Discussion on Stage2 Updates for NN-DC | discussion | ZTE Corporation |
R3-97 AI: 10.11.1 |
withdrawn | [WTS] [JSN] | |||
R3-173485 | Correction of TS38.300 for NN-DC | pCR | ZTE Corporation | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.1 |
withdrawn | [WTS] [JSN] |
R3-173486 | Correction of 38.413 for Initial Context Setup | pCR | ZTE Corporation | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.12.3.1 |
withdrawn | [WTS] [JSN] |
R3-173487 | Further Clarification on PDU Session@QoS Flow Failure Relevant Handling | discussion | ZTE Corporation |
R3-97 AI: 10.12.3.1 |
withdrawn | [WTS] [JSN] | |||
R3-173488 | Correction of 38.413 for PDU Session@QoS Flow Failure Relevant Handling | pCR | ZTE Corporation | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.12.3.1 |
withdrawn | [WTS] [JSN] |
R3-173489 | Further Consideration on PDU SESSION RESOURCE NOTIFY | discussion | ZTE Corporation |
R3-97 AI: 10.12.3.1 |
withdrawn | [WTS] [JSN] | |||
R3-173490 | Latest TS37.340 Rapporteur |
discussion revised to R3-174254 |
ZTE Corporation | NR_newRAT | Rel-15 |
R3-97 AI: 10.11.2 |
agreed | [WTS] [JSN] | |
R3-173491 | Clean-up of 37.340 RAN3 Related Part |
pCR revised to R3-174101 |
ZTE Corporation | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.2 |
revised | [WTS] [JSN] |
R3-173492 | Updated DraftTS 38.414 NG-RAN NG Data Transport |
discussion revised to R3-174100 |
ZTE Corporation | NR_newRAT | Rel-15 |
R3-97 AI: 10.12.4 |
revised | [WTS] [JSN] | |
R3-173493 | Baseline CR for Rel.15 NR (RAN3 part) |
draftCR revision of R3-173457 revised to R3-174253 |
Nokia, Nokia Shanghai Bell, ZTE | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.5 |
agreed | [WTS] [JSN] | |
R3-173494 | Completion of the RRC tunnelling in MR-DC |
pCR revised to R3-174132 |
Nokia, Nokia Shanghai Bell | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] |
R3-173495 | Completion of the RRC tunnelling in MR-DC |
other revised to R3-174133 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] | |
R3-173496 | Completion of the RRC tunnelling in MR-DC |
pCR revised to R3-174134 |
Nokia, Nokia Shanghai Bell | 38.423 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.1 |
revised | [WTS] [JSN] |
R3-173497 | S-RLF handling for MR-DC | pCR | Nokia, Nokia Shanghai Bell | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
not pursued | [WTS] [JSN] |
R3-173498 | S-RLF handling for MR-DC | other | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
withdrawn | [WTS] [JSN] | |
R3-173499 | S-RLF handling for MR-DC | pCR | Nokia, Nokia Shanghai Bell | 38.423 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.1 |
not pursued | [WTS] [JSN] |
R3-173500 | RLC mode control | other | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
not pursued | [WTS] [JSN] | |
R3-173501 | RLC mode control | pCR | Nokia, Nokia Shanghai Bell | 38.423 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.1 |
not pursued | [WTS] [JSN] |
R3-173502 | Support for delta signalling in case of SN change | pCR | Nokia, Nokia Shanghai Bell | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
not pursued | [WTS] [JSN] |
R3-173503 | [DRAFT] LS on MN-initiated SN change for delta signalling |
LS out LS is reply to R2-1707502 source LS: R2-1707502 LS To: RAN2 revised to R3-174200 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
revised | [WTS] [JSN] | |
R3-173504 | Exchange of throughput information for UE-AMBR enforcement | pCR | Nokia, Nokia Shanghai Bell | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.8 |
not pursued | [WTS] [JSN] |
R3-173505 | Correction of the node naming | other | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
not pursued | [WTS] [JSN] | |
R3-173506 | Implementation of the DL Data Delivery Status polling | other | Nokia, Nokia Shanghai Bell, KDDI, Vodafone | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
not pursued | [WTS] [JSN] | |
R3-173507 | Implementation of the DL Data Delivery Status polling | pCR | Nokia, Nokia Shanghai Bell, KDDI, Vodafone | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
not pursued | [WTS] [JSN] |
R3-173508 | PDCP flow control for split bearers mapped on RLC UM | other | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
not pursued | [WTS] [JSN] | |
R3-173509 | Correction for CP overload control | CR | Huawei | 36.413 14.4.0 CR#1535 catF | NB_IOTenh-Core | Rel-14 |
R3-97 AI: 9.2 |
rejected | [WTS] [JSN] |
R3-173510 | eNB capability on supporting of reliable DL NAS delivery | discussion | Huawei | NB_IOTenh-Core | Rel-14 |
R3-97 AI: 8.1 |
not pursued | [WTS] [JSN] | |
R3-173511 | eNB capability on supporting of reliable DL NAS delivery | draftCR | Huawei | NB_IOTenh-Core | Rel-14 |
R3-97 AI: 8.1 |
not pursued | [WTS] [JSN] | |
R3-173512 | [Draft]reply LS on supporting of reliable DL NAS delivery |
LS out LS is reply to S2-176333 LS To: TSG WG SA2 revised to R3-174113 |
Huawei (TSG WG RAN3) | NB_IOTenh-Core | Rel-14 |
R3-97 AI: 8.1 |
revised | [WTS] [JSN] | |
R3-173513 | Discussion on RTK procedures | discussion | Huawei | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.1 |
noted | [WTS] [JSN] | |
R3-173514 | Introduction of signalling procedures for RTK positioning | CR | Huawei | 36.455 14.3.0 CR#78 catB | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.1 |
withdrawn | [WTS] [JSN] |
R3-173515 | Discussion on assistance data transmission | discussion | Huawei | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.2 |
noted | [WTS] [JSN] | |
R3-173516 | Assistance data transmission over LPPa for one SIB | CR | Huawei | 36.455 14.3.0 CR#79 catB | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.2 |
withdrawn | [WTS] [JSN] |
R3-173517 | Assistance data transmission over LPPa for multi SIBs | CR | Huawei | 36.455 14.3.0 CR#80 catB | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.2 |
withdrawn | [WTS] [JSN] |
R3-173518 | NB-IoT Early Data transmission | discussion | Huawei | NB_IOTenh2-Core | Rel-15 |
R3-97 AI: 13.1 |
noted | [WTS] [JSN] | |
R3-173519 | Introduction of NB-IoT early data transmission |
CR revised to R3-174163 |
Huawei | 36.413 14.4.0 CR#1536 catB | NB_IOTenh2-Core | Rel-15 |
R3-97 AI: 13.1 |
revised | [WTS] [JSN] |
R3-173520 | Further consideration of UE differentation | discussion | Huawei | NB_IOTenh2-Core | Rel-15 |
R3-97 AI: 13.2 |
noted | [WTS] [JSN] | |
R3-173521 | Correction of eNB-CU eNB-DU scenarios |
pCR revised to R3-174165 |
Huawei, China Unicom, Orange | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12.1 |
revised | [WTS] [JSN] |
R3-173522 | ng-eNB CU DU deployment for architecture option 4 |
pCR revised to R3-174167 |
Huawei, China Unicom, Orange | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12.1 |
revised | [WTS] [JSN] |
R3-173523 | V1AP RRC Message Transfer |
pCR revised to R3-174168 |
Huawei, China Unicom, Orange | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12.2 |
revised | [WTS] [JSN] |
R3-173524 | V1 interface management and UE Context management | pCR | Huawei, China Unicom, Orange | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12.2 |
agreed | [WTS] [JSN] |
R3-173525 | User Plane aspects of V1 interface |
pCR revised to R3-174169 |
Huawei, China Unicom | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12.2 |
revised | [WTS] [JSN] |
R3-173526 | Discussion on the solution of delta signaling | discussion | ZTE | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
noted | [WTS] [JSN] | |
R3-173527 | [DRAFT] Reply LS on MN-initiated SN change for delta signalling | discussion | ZTE | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
withdrawn | [WTS] [JSN] | |
R3-173528 | Reconsideration on MN handover with SN change | pCR | ZTE | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
not pursued | [WTS] [JSN] |
R3-173529 | Consideration on the Remaining issues of EN-DC Operation related aspects in TS 37.340 | pCR | ZTE | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
withdrawn | [WTS] [JSN] |
R3-173530 | TP 36.300 for counter check |
draftCR revised to R3-174138 |
ZTE | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] | |
R3-173531 | TP 38.300 for counter check | pCR | ZTE | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
not pursued | [WTS] [JSN] |
R3-173532 | TP 38.423 for Counter check | pCR | ZTE | 38.423 0.2.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.1.3 |
not pursued | [WTS] [JSN] |
R3-173533 | TP 37.340 for modification on RRC transfer procedure for MCG split SRBs | pCR | ZTE | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.5 |
not pursued | [WTS] [JSN] |
R3-173534 | TP 36.423 for modification on RRC transfer procedure for MCG split SRBs | draftCR | ZTE, Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.5 |
withdrawn | [WTS] [JSN] | |
R3-173535 | TP 38.423 for modification on RRC transfer procedure for MCG split SRBs | pCR | ZTE | 38.423 0.2.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.1.5 |
withdrawn | [WTS] [JSN] |
R3-173536 | Analysis on NGAP support for multiple-SCTP associations | pCR | Nokia, Nokia Shanghai Bell | 38.41 0.4.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.5.1 |
not pursued | [WTS] [JSN] |
R3-173537 | TP for supporting N2 requirements from SA2 (TS38.413) |
pCR revised to R3-174178 |
Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.5.1 |
revised | [WTS] [JSN] |
R3-173538 | Discussion on DL NAS Transport | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.12.3.1 |
agreed | [WTS] [JSN] |
R3-173539 | Discussion on AMF management | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.12.3.1 |
not pursued | [WTS] [JSN] |
R3-173540 | Discussion on UE Radio Capability handling | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT | Rel-15 |
R3-97 AI: 10.12.3.1 |
not pursued | [WTS] [JSN] | |
R3-173541 | Use of DNS for AMF discovery |
pCR revised to R3-174162 |
Nokia, Nokia Shanghai Bell, Verizon Wireless | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
revised | [WTS] [JSN] |
R3-173542 | Draft LS on use of DNS for AMF discovery |
LS out LS To: TSG WG CT4 |
Nokia, Nokia Shanghai Bell, Verizon Wireless |
R3-97 AI: 10.3.3 |
withdrawn | [WTS] [JSN] | |||
R3-173543 | Documentation of option 3 in the F1 specifications and other specifications | discussion | Interdigital Asia LLC | Rel-15 |
R3-97 AI: 10.8.1.2 |
noted | [WTS] [JSN] | ||
R3-173544 | Documentation of option 3 in in 38.401 | pCR | Interdigital Asia LLC | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.2.1 |
withdrawn | [WTS] [JSN] |
R3-173545 | Documentation of option 3 in in 38.470 |
pCR revised to R3-174126 |
Interdigital Asia LLC | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] |
R3-173546 | Documentation of option 3 in in 38.471 |
pCR revised to R3-174127 |
Interdigital Asia LLC | 38.471 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] |
R3-173547 | Documentation of option 3 in in 38.472 |
pCR revised to R3-174128 |
Interdigital Asia LLC | 38.472 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] |
R3-173548 | Documentation of option 3 in in 38.473 |
pCR revised to R3-174129 |
Interdigital Asia LLC | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] |
R3-173549 | Documentation of option 3 in in 38.474 |
pCR revised to R3-174130 |
Interdigital Asia LLC | 38.474 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] |
R3-173550 | Documentation of option 3 in in 38.475 |
pCR revised to R3-174131 |
Interdigital Asia LLC | 38.475 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] |
R3-173551 | Documentation of option 3 in in 38.401 |
pCR revised to R3-174125 |
Interdigital Asia LLC | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] |
R3-173552 | Cell activation procedure |
pCR revised to R3-174149 |
Nokia, Nokia Shanghai Bell, AT&T, KDDI, KT, Vodafone, Fujitsu | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.8 |
revised | [WTS] [JSN] |
R3-173553 | TP of Cell management procedure (TS 38.473) | pCR | Nokia, Nokia Shanghai Bell, AT&T, KDDI, KT, Vodafone, Fujitsu | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.8 |
withdrawn | [WTS] [JSN] |
R3-173554 | Retransmission procedure in radio link outage | pCR | Nokia, Nokia Shanghai Bell | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.9 |
not pursued | [WTS] [JSN] |
R3-173555 | TP of Retransmission procedure in radio link outage (TS 38.475) | pCR | Nokia, Nokia Shanghai Bell | 38.475 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
withdrawn | [WTS] [JSN] |
R3-173556 | gNB-DU Measurement Reporting | pCR | Nokia, Nokia Shanghai Bell | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173557 | TP of gNB-DU Measurement Reporting (TS 38.473) | pCR | Nokia, Nokia Shanghai Bell | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173558 | Inter-gNB-DU Mobility procedure | pCR | Nokia, Nokia Shanghai Bell, KT | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.6 |
not pursued | [WTS] [JSN] |
R3-173559 | TP of UE Attached Indication (TS 38.473) | pCR | Nokia, Nokia Shanghai Bell, KT | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.6 |
withdrawn | [WTS] [JSN] |
R3-173560 | Load management | pCR | Nokia, Nokia Shanghai Bell | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173561 | TP of Load management (TS 38.473) | pCR | Nokia, Nokia Shanghai Bell | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173562 | [DRAFT]LS on load management in gNB-CU/DU configuration |
LS out LS To: RAN2 |
Nokia, Nokia Shanghai Bell | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] | |
R3-173563 | Paging management |
pCR revised to R3-174152 |
Nokia, Nokia Shanghai Bell | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.7 |
revised | [WTS] [JSN] |
R3-173564 | TP of Paging management (TS 38.473) | pCR | Nokia, Nokia Shanghai Bell | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
withdrawn | [WTS] [JSN] |
R3-173565 | TP of Paging management (TS 38.473) | pCR | Nokia, Nokia Shanghai Bell | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
withdrawn | [WTS] [JSN] |
R3-173566 | System Information management | pCR | Nokia, Nokia Shanghai Bell, KT, Fujitsu | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173567 | TP of System Information management (TS 38.473) | pCR | Nokia, Nokia Shanghai Bell, KT, Fujitsu | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173568 | UE Initial Access procedure | pCR | Nokia, Nokia Shanghai Bell | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.5 |
not pursued | [WTS] [JSN] |
R3-173569 | Scenarios, benefits and solution |
pCR revised to R3-174145 |
Nokia, Nokia Shanghai Bell | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
revised | [WTS] [JSN] |
R3-173570 | Further clarification of architecture | pCR | Nokia, Nokia Shanghai Bell | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
agreed | [WTS] [JSN] |
R3-173571 | E1 General functions and procedures | pCR | Nokia, Nokia Shanghai Bell | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] |
R3-173572 | Conclusions for CP/UP separation study | pCR | Nokia, Nokia Shanghai Bell | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.3 |
not concluded | [WTS] [JSN] |
R3-173573 | Reply LS to Supported features by 5GC for E-UTRA connected to 5G CN (R2-1706153/C1-172843 and S2-175192/C1-172862) |
LS in LS is reply to R2-1706153/C1-172843 and S2-175192/C1-172862 source LS: C1-173571 LS To: SA WG2, RAN WG2 |
3GPP CT WG1, Huawei | 5GS_Ph1-CT | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173574 | Reply LS on request to update maximum data rate values in EPS |
LS in LS is reply to S2-173684 source LS: C1-173572 LS To: SA WG2 |
3GPP CT WG1, Qualcomm | 5GS_Ph1-CT | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173575 | Reply LS on algorithm selection in E-UTRA-NR Dual Connectivity |
LS in LS is reply to S3-172078 source LS: C1-173748 LS To: SA WG3, CT WG4 |
3GPP CT WG1, Ericsson | EDCE5 | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173576 | Reply LS on NR Idle Mode procedures |
LS in LS is reply to S2-175089 source LS: C1-173749 LS To: SA WG2, RAN WG2, SA WG1 |
3GPP CT WG1, Qualcomm | 5GS_Ph1-CT | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173577 | Reply LS on LTE call redirection to GERAN |
LS in LS is reply to R2-1706149 source LS: C1-173752 LS To: RAN WG2 |
3GPP CT WG1, Nokia | TEI15 | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173578 | Reply LS on Request to update maximum data rate values in EPS |
LS in LS is reply to S2-173685 source LS: C3-174339 LS To: SA WG2, SA WG5, RAN WG3, CT WG1, CT WG4 |
3GPP CT WG3, Nokia | EDCE5-CT | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173579 | Support of early contention resolution in NB-IoT |
LS in source LS: R1-1714719 LS To: RAN WG2 |
3GPP RAN WG1, Qualcomm | NB_IOT | Rel-13 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173580 | LS response on spectrum utilization |
LS in LS is reply to R1-1712050 source LS: R1-1715184 LS To: RAN WG4, RAN WG2, RAN WG3 |
3GPP RAN WG1, Huawei | NR_newRAT | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173581 | LS on backhaul signalling for UE harmonic interference handling |
LS in source LS: R1-1716698 LS To: RAN WG3 |
3GPP RAN WG1, Vivo | NR_newRAT-Core | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173582 | LS on CSG support in NB-IoT |
LS in source LS: R2-1709705 LS To: RAN WG3, RAN WG4 |
3GPP RAN WG2, Nokia | NB_IOTenh2-Core | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173583 | LS on Certification/License and Identification of Aerial Vehicles |
LS in source LS: R2-1709973 LS To: SA WG2 |
3GPP RAN WG2, NTT Docomo | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | ||
R3-173584 | Reply LS to SA2 on progress of eVoLP |
LS in LS is reply to S2-174844 source LS: R2-1709975 LS To: SA WG2 |
3GPP RAN WG2, Huawei | FS_eVoLP | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173585 | LS on RAN4 Rel-14 UE Feature List |
LS in source LS: R4-1709180 LS To: RAN WG2 |
3GPP RAN WG4, Intel | TEI14 | Rel-14 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173586 | LS on IMT-2020 submission |
LS in source LS: RP-172099 LS To: TSG SA, RAN WG1, RAN WG2, RAN WG3, RAN WG4, RAN WG5 |
3GPP RAN, NEC | Rel-15 |
R3-97 AI: 8.1 |
postponed | [WTS] [JSN] | ||
R3-173587 | LS on single Tx switched UL |
LS in source LS: RP-172100 LS To: RAN WG4, RAN WG2 |
3GPP RAN, Qualcomm | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.1.2 |
noted | [WTS] [JSN] | |
R3-173588 | LS on capability indication for downlink NAS data PDU acknowledgment |
LS in source LS: S2-176033 LS To: RAN WG3 |
3GPP SA WG2, Huawei | CIoT_Ext | Rel-14 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173589 | Reply LS on Solution 9 (Option 2) for CN overload control for CP data |
LS in LS is reply to C1-172759 source LS: S2-176130 LS To: CT WG1, RAN WG3, RAN WG2 |
3GPP SA WG2, Qualcomm | CIoT_Ext | Rel-14 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173590 | LS on coexistence between RRC inactive and dual connectivity |
LS in source LS: S2-176158 LS To: RAN WG2, RAN WG3 |
3GPP SA WG2, Qualcomm | 5GS_Ph1 | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173591 | LS on FS_REAR study outcome |
LS in LS is reply to R2-1703967 source LS: S2-176446 LS To: RAN, RAN WG1, RAN WG2, RAN WG3 |
3GPP SA WG2, Huawei | FS_REAR, FS_feD2D_IoT_relay_wearable | Rel-15 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173592 | LS on Paging failures for CE Capable UEs |
LS in source LS: S2-176685 LS To: RAN WG2, RAN WG3 |
3GPP SA WG2, NTT Docomo | TEI13 | Rel-13 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173593 | Discussion on CA based PDCP Duplication | pCR | CATT | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173594 | Discussion on cell setup procedure | pCR | CATT | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.8 |
not pursued | [WTS] [JSN] |
R3-173595 | Discussion on F1 SETUP procedure | pCR | CATT | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
not pursued | [WTS] [JSN] |
R3-173596 | Discussion on system information transfer |
pCR revised to R3-174122 |
CATT | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
revised | [WTS] [JSN] |
R3-173597 | Discussion on EN-DC X2 setup procedure | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
not pursued | [WTS] [JSN] | |
R3-173598 | TP for 36.423 on EN-DC X2 setup procedure | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
not pursued | [WTS] [JSN] | |
R3-173599 | Discussion on initial UE access | pCR | CATT | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
not pursued | [WTS] [JSN] |
R3-173600 | TP for 38.473 on initial UE access related procedure | pCR | CATT | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
withdrawn | [WTS] [JSN] |
R3-173601 | Discussion on DU admission control | pCR | CATT | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
not pursued | [WTS] [JSN] |
R3-173602 | Discussion on SCG Change |
pCR revised to R3-174136 |
CATT | 37.34 1.0.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] |
R3-173603 | TP for 36.423 on SCG Change |
draftCR revised to R3-174137 |
CATT | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] | |
R3-173604 | Some consideration on bearer type change | pCR | CATT | 37.34 1.0.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.6 |
not pursued | [WTS] [JSN] |
R3-173605 | TP for 36.423 on bearer type change | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.6 |
not pursued | [WTS] [JSN] | |
R3-173606 | Discussion on the remaining issue for EN-DC SRB | pCR | CATT | 37.34 1.0.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.5 |
not pursued | [WTS] [JSN] |
R3-173607 | TP for 36.423 on remaining issue for EN-DC SRB | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.5 |
withdrawn | [WTS] [JSN] | |
R3-173608 | Handling of DL signallings | pCR | CATT | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.2 |
not pursued | [WTS] [JSN] |
R3-173609 | TP for 38.423 on DL signalling handling | pCR | CATT | 38.423 0.2.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.6.2 |
withdrawn | [WTS] [JSN] |
R3-173610 | TP for 38.413 on DL signalling handling | pCR | CATT | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.6.2 |
withdrawn | [WTS] [JSN] |
R3-173611 | Discussion on Content of RAN Paging | pCR | CATT | 38.423 0.2.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.6.3 |
not pursued | [WTS] [JSN] |
R3-173612 | Discussion on RAN Paging failure | pCR | CATT | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.3 |
not pursued | [WTS] [JSN] |
R3-173613 | Discussion on inter system data forwarding | pCR | CATT | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.7.3 |
not pursued | [WTS] [JSN] |
R3-173614 | Discussion on Slice mobility issue | discussion | CATT |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] | |||
R3-173615 | Discussion on Slice unavailable | discussion | CATT |
R3-97 AI: 10.2.2 |
withdrawn | [WTS] [JSN] | |||
R3-173616 | Discussion on Notification Control | discussion | CATT |
R3-97 AI: 10.1.5 |
noted | [WTS] [JSN] | |||
R3-173617 | TP for 38.413 on NG-AP Notification Control | pCR | CATT | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.1.5 |
not pursued | [WTS] [JSN] |
R3-173618 | TP for 38.423 on Xn-AP Notification Control | pCR | CATT | 38.423 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.1.5 |
not pursued | [WTS] [JSN] |
R3-173619 | Paging failures for CE Capable UEs | discussion | Huawei | TEI14 | Rel-14 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173620 | Paging failures for CE Capable UEs from 2G/3G | draftCR | Huawei | TEI14 | Rel-14 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |
R3-173621 | [Draft] reply LS on Paging failures for CE Capable UEs |
LS out LS is reply to S2-176685 LS To: SA2, RAN2 |
Huawei | TEI14 | Rel-14 |
R3-97 AI: 8.1 |
withdrawn | [WTS] [JSN] | |
R3-173622 | Consideration on Paging Message Generation and Delivery over F1 interface | discussion | China Telecommunications |
R3-97 AI: 10.10.1.7 |
noted | [WTS] [JSN] | |||
R3-173623 | Procedures for information request and transmission | pCR | IAESI, Thales, Fairspectrum, VTT | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.6 |
not pursued | [WTS] [JSN] |
R3-173624 | Architecture details of split gNB-CU | pCR | IAESI, Thales, Fairspectrum, VTT | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
not pursued | [WTS] [JSN] |
R3-173625 | Paging failures for CE Capable UEs from 2G/3G | draftCR | Huawei | TEI14 | Rel-13 |
R3-97 AI: 8.1 |
withdrawn | [WTS] [JSN] | |
R3-173626 | Paging failures for CE Capable UEs from legacy LTE cell | CR | Huawei | 36.413 14.4.0 CR#1537 catF | TEI14 | Rel-14 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] |
R3-173627 | Paging failures for CE Capable UEs from legacy LTE cell | CR | Huawei | 36.413 13.6.0 CR#1538 catA | TEI14 | Rel-13 |
R3-97 AI: 8.1 |
withdrawn | [WTS] [JSN] |
R3-173628 | Further enhancements to the flow control | other | Nokia, Nokia Shanghai Bell, KDDI, Vodafone | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
not pursued | [WTS] [JSN] | |
R3-173629 | Further enhancements to the flow control | pCR | Nokia, Nokia Shanghai Bell, KDDI, Vodafone | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
withdrawn | [WTS] [JSN] |
R3-173630 | Further discussion on TNL address discovery for EN-DC | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | |
R3-173631 | On the gNB ID open issues | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
noted | [WTS] [JSN] | |
R3-173632 | UE-AMBR enforcement in EN-DC | other | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.8 |
not pursued | [WTS] [JSN] | |
R3-173633 | Energy saving for EN-DC | other | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
not pursued | [WTS] [JSN] | |
R3-173634 | Data volume reporting for EN-DC | other | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
not pursued | [WTS] [JSN] | |
R3-173635 | Support for multiple SCTP associations in F1 | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.1 |
noted | [WTS] [JSN] | |
R3-173636 | Rapporteur update for TS 38.420 | pCR | Qualcomm Incorporated | 38.42 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.4 |
agreed | [WTS] [JSN] |
R3-173637 | On NAS PDU acknowledgements over S1 | discussion | Qualcomm Incorporated | Rel-14 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | ||
R3-173638 | Discussion of Paging failures for CE Capable UEs | discussion | Qualcomm Incorporated | Rel-14 |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | ||
R3-173639 | Rapporteur updates to RAN3-related sections of TS 38.300 | pCR | Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.1 |
agreed | [WTS] [JSN] |
R3-173640 | Stage 2 for PWS support (TS 38.410) | pCR | Nokia, Nokia Shanghai Bell, AT&T, Huawei, one2many | 38.41 0.4.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.4 |
not concluded | [WTS] [JSN] |
R3-173641 | Stage 2 for PWS support (TS 38.401) | pCR | Nokia, Nokia Shanghai Bell, Huawei, one2many | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.4 |
not concluded | [WTS] [JSN] |
R3-173642 | Further details of NR Cell Identity and gNB ID | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.5.3 |
not pursued | [WTS] [JSN] |
R3-173643 | Draft LS on length of NR Cell Identity |
LS out LS To: TSG WG RAN2 revised to R3-174180 |
Nokia, Nokia Shanghai Bell |
R3-97 AI: 10.5.3 |
revised | [WTS] [JSN] | |||
R3-173644 | Updated work plan for UE Positioning Accuracy Enhancements for LTE work item | Work Plan | Nokia, Nokia Shanghai Bell | Rel-15 |
R3-97 AI: 15 |
noted | [WTS] [JSN] | ||
R3-173645 | RTK GNSS positioning enhancement | discussion | Nokia, Nokia Shanghai Bell | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.1 |
noted | [WTS] [JSN] | |
R3-173646 | Bearer type change between SCG bearer and SCG Split bearer | discussion | LG Electronics, KT Corp. |
R3-97 AI: 10.8.1.6 |
noted | [WTS] [JSN] | |||
R3-173647 | Consideration on UE-AMBR for Option 3 family | discussion | LG Electronics, KT Corp. |
R3-97 AI: 10.8.1.8 |
noted | [WTS] [JSN] | |||
R3-173648 | TNL address discovery for Option 3 | discussion | LG Electronics Inc., KT Corp. |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | |||
R3-173649 | Issues on Security for CU-CP and CU-UP Separation | discussion | LG Electronics UK |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] | |||
R3-173650 | TP of NG-RAN architecture – 38.401 |
discussion revision of R3-173054 |
China Telecommunications | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.3 |
withdrawn | [WTS] [JSN] | |
R3-173651 | TP for 38.401 |
pCR revision of R3-173058 |
China Telecommunications | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.3 |
withdrawn | [WTS] [JSN] |
R3-173652 | Discussion on the solution for UE Initial Access | pCR | ZTE Corporation | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.5 |
noted | [WTS] [JSN] |
R3-173653 | UE Context Management over F1 interface for TS38.401 | pCR | ZTE Corporation | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.2.2 |
not pursued | [WTS] [JSN] |
R3-173654 | UE Context Management over F1 interface for TS38.470 | pCR | ZTE Corporation | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
withdrawn | [WTS] [JSN] |
R3-173655 | UE Context Management over F1 interface for TS38.473 | pCR | ZTE Corporation | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
withdrawn | [WTS] [JSN] |
R3-173656 | Left ID issues over F1 interface | discussion | ZTE Corporation, CMCC, China Unicom, China Telecom |
R3-97 AI: 10.10.1.2 |
noted | [WTS] [JSN] | |||
R3-173657 | Update on F1 interface management for TS38.470 | pCR | ZTE Corporation | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
not pursued | [WTS] [JSN] |
R3-173658 | Update on F1 interface management for TS38.473 | pCR | ZTE Corporation | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
not pursued | [WTS] [JSN] |
R3-173659 | RRC message transmission over F1 interface for TS38.470 | pCR | ZTE Corporation | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.4 |
withdrawn | [WTS] [JSN] |
R3-173660 | RRC message transmission over F1 interface for TS38.473 | pCR | ZTE Corporation | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.4 |
withdrawn | [WTS] [JSN] |
R3-173661 | Update on Flow control over F1 interface for TS38.401 | pCR | ZTE Corporation | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173662 | Update on Flow control over F1 interface for TS38.475 | pCR | ZTE Corporation | 38.475 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173663 | Stage2 update for TS38.300 | pCR | ZTE Corporation | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.1 |
withdrawn | [WTS] [JSN] |
R3-173664 | Further discussion on the E1 scenarios | discussion | ZTE Corporation |
R3-97 AI: 22.1 |
noted | [WTS] [JSN] | |||
R3-173665 | Further consideration on SI (Re)configuration over F1 interface | discussion | ZTE Corporation |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] | |||
R3-173666 | SI (Re)configuration over F1 interface for TS38.401 | pCR | ZTE Corporation | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173667 | SI (Re)configuration over F1 interface for TS38.470 | pCR | ZTE Corporation | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173668 | SI (Re)configuration over F1 interface for TS38.473 | pCR | ZTE Corporation | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
not pursued | [WTS] [JSN] |
R3-173669 | Draft LS to RAN2 on On demand SI request sending in MSG3 |
LS out LS To: RAN2 |
ZTE Corporation |
R3-97 AI: 10.10.1.4 |
withdrawn | [WTS] [JSN] | |||
R3-173670 | Discussion on F1-U flow control enhancement | discussion | ZTE Corporation, China Unicom, China Telecom |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] | |||
R3-173671 | Discussion on F1-U flow control for UM RLC | discussion | ZTE Corporation, China Unicom, China Telecom |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] | |||
R3-173672 | Discussion on paging over F1 | discussion | ZTE Corporation |
R3-97 AI: 10.10.1.7 |
not pursued | [WTS] [JSN] | |||
R3-173673 | Paging over F1 for TS38.401 | pCR | ZTE Corporation | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.7 |
withdrawn | [WTS] [JSN] |
R3-173674 | Paging over F1 for TS38.470 | pCR | ZTE Corporation | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
withdrawn | [WTS] [JSN] |
R3-173675 | Paging over F1 for TS38.473 | pCR | ZTE Corporation | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
withdrawn | [WTS] [JSN] |
R3-173676 | Discussion on CU-DU Node synchronization | discussion | ZTE Corporation |
R3-97 AI: 10.10.1. |
noted | [WTS] [JSN] | |||
R3-173677 | CU-DU Node synchronization for TS38.401 | pCR | ZTE Corporation | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1. |
withdrawn | [WTS] [JSN] |
R3-173678 | CU-DU Node synchronization for TS38.470 | pCR | ZTE Corporation | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1. |
withdrawn | [WTS] [JSN] |
R3-173679 | CU-DU Node synchronization for TS38.473 | pCR | ZTE Corporation | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1. |
withdrawn | [WTS] [JSN] |
R3-173680 | Discussion on Secondary node modification in EN-DC | pCR | ZTE Corporation | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.3 |
not pursued | [WTS] [JSN] |
R3-173681 | Discussion on F1 setup and cell activation | discussion | ZTE Corporation, China Unicom |
R3-97 AI: 10.10.1.8 |
noted | [WTS] [JSN] | |||
R3-173682 | Discussion on Inter-DU Mobility and Intra-DU Mobility | pCR | ZTE Corporation, China Telecom | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.6 |
not pursued | [WTS] [JSN] |
R3-173683 | Further discussion on RAN3 impact on early data transmission in eNB-IoT | discussion | ZTE Corporation |
R3-97 AI: 13.1 |
noted | [WTS] [JSN] | |||
R3-173684 | Provide QoS Parameters during UE CONTEXT RESUME procedure | discussion | ZTE Corporation | Rel-14 |
R3-97 AI: 31.2 |
noted | [WTS] [JSN] | ||
R3-173685 | Provide QoS Parameters during UE CONTEXT RESUME procedure | CR | ZTE Corporation | 36.413 14.4.0 CR#1539 catF | TEI14 | Rel-14 |
R3-97 AI: 31.2 |
rejected | [WTS] [JSN] |
R3-173686 | Correction of 37.340 for RRC TRANSFER Message for UL Case | pCR | ZTE Corporation | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.5 |
not pursued | [WTS] [JSN] |
R3-173687 | Correction of 38.423 for RRC TRANSFER Message for UL Case | pCR | ZTE Corporation | 38.423 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.1.5 |
not pursued | [WTS] [JSN] |
R3-173688 | Discussion on bearer and flow offloading for Option 7 family | discussion | LG Electronics UK |
R3-97 AI: 10.8.2.3 |
noted | [WTS] [JSN] | |||
R3-173689 | On the function split of SI message encoding and the support for SI exchange over F1-C | discussion | China Telecommunications |
R3-97 AI: 10.10.1.4 |
not pursued | [WTS] [JSN] | |||
R3-173690 | TP for SI message encoding | pCR | China Telecommunications | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.4 |
not pursued | [WTS] [JSN] |
R3-173691 | Elementary procedure for transferring NR Measurement Report | pCR | NTT DOCOMO INC. | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
not pursued | [WTS] [JSN] |
R3-173692 | Further consideration on mechanism of centralized retransmission of lost PDUs | pCR | NTT DOCOMO INC. | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.9 |
not pursued | [WTS] [JSN] |
R3-173693 | Wayforward on gNB ID length | discussion | NTT DOCOMO INC. | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
noted | [WTS] [JSN] | |
R3-173694 | Inter Master Node handover with Secondary Node change |
pCR revised to R3-174116 |
NTT DOCOMO INC. | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8 |
revised | [WTS] [JSN] |
R3-173695 | Discussion on coordination between LTE and NR for LTE-NR co-existence | discussion | ZTE Corporation |
R3-97 AI: 8.1 |
noted | [WTS] [JSN] | |||
R3-173696 | Discussion on 2nd harmonic issue | discussion | ZTE Corporation |
R3-97 AI: 10.14 |
noted | [WTS] [JSN] | |||
R3-173697 | en-gNB TNL Address Discovery | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | |
R3-173698 | Stage 2 CR of en-gNB X2 TNL address discovery | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | |
R3-173699 | Stage 3 CR of en-gNB TNL address discovery | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | |
R3-173700 | X2 setup and node configuration update for option 3 | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
noted | [WTS] [JSN] | |
R3-173701 | Stage 2 CR of X2 setup and node configuration update for option 3 | draftCR | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
not pursued | [WTS] [JSN] | |
R3-173702 | Stage 3 CR of X2 setup and node configuration update for option 3 |
draftCR revised to R3-174112 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
revised | [WTS] [JSN] | |
R3-173703 | RAN paging failure handling | pCR | Huawei, Intel Corporation | 38.3 0.7.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.3 |
not pursued | [WTS] [JSN] |
R3-173704 | RAN paging enhancement | pCR | Huawei | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.3 |
not pursued | [WTS] [JSN] |
R3-173705 | NG context fetch for inactive mode UE | pCR | Huawei, Intel Corporation | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.4 |
noted | [WTS] [JSN] |
R3-173706 | RAN-based notification area update | pCR | Huawei, Intel Corporation | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.4 |
not pursued | [WTS] [JSN] |
R3-173707 | Stage 3 TP of RAN-based notification area update | pCR | Huawei, Intel Corporation | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.4 |
withdrawn | [WTS] [JSN] |
R3-173708 | Data forwarding handling for inactive UEs | pCR | Huawei | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.5 |
withdrawn | [WTS] [JSN] |
R3-173709 | Further considerations for Xn/X2 support for a case of a single TX operation with LTE/NR dual connectivity | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
noted | [WTS] [JSN] | |
R3-173710 | Details procedures for NRPPa | pCR | Huawei, HiSilicon | 38.455 0.1.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.13.1 |
not pursued | [WTS] [JSN] |
R3-173711 | Introduction of Band 73 | CR | Huawei, HiSilicon | 25.461 15.0.0 CR#108 catB | LTE450_Reg3-Core | Rel-15 |
R3-97 AI: 18.2 |
agreed | [WTS] [JSN] |
R3-173712 | Introduction of Band 73 | CR | Huawei, HiSilicon | 25.466 15.0.0 CR#78 catB | LTE450_Reg3-Core | Rel-15 |
R3-97 AI: 18.2 |
agreed | [WTS] [JSN] |
R3-173713 | TP on pros and cons of CP-UP separation deployment scenarios | discussion | Huawei | Rel-15 |
R3-97 AI: 22.1 |
not pursued | [WTS] [JSN] | ||
R3-173714 | UE initial access procedure for CP-UP separation | discussion | Huawei | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] | ||
R3-173715 | SgNB addition procedure for CP-UP separation | discussion | Huawei | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] | ||
R3-173716 | Handover procedure for CP-UP separation | discussion | Huawei | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] | ||
R3-173717 | Discussions on Security handling for CP-UP separation | discussion | Huawei | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] | ||
R3-173718 | Draft LS to SA3 on open issues of security handling for CP-UP separation | other | Huawei | Rel-15 |
R3-97 AI: 22.3 |
not concluded | [WTS] [JSN] | ||
R3-173719 | System Information Delivery over F1 | pCR | Huawei | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173720 | pCR on System Information Delivery over F1 to 38.473 | pCR | Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173721 | Open issues for RRC inactive support in CU-DU | pCR | Huawei | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173722 | QoS information transfer over F1 | pCR | Huawei | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
not pursued | [WTS] [JSN] |
R3-173723 | pCR on QoS information transfer over F1 to 38.473 | pCR | Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
withdrawn | [WTS] [JSN] |
R3-173724 | pCR on L1/L2 configuration for gNB-DU to 38.473 | pCR | Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
withdrawn | [WTS] [JSN] |
R3-173725 | Discussion on configuration update procedures between gNB-CU and gNB-DU |
discussion revised to R3-174172 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
revised | [WTS] [JSN] | |
R3-173726 | pCR on open issues for PDCP duplication over F1 to 38.473 | pCR | Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173727 | pCR on Correction on UE initial access signalling flow to 38.401 | pCR | Huawei | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.3 |
not pursued | [WTS] [JSN] |
R3-173728 | Discussions on mobility procedures over F1 | pCR | Huawei | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.6 |
not pursued | [WTS] [JSN] |
R3-173729 | pCR on mobility procedures over F1 to 38.473 | pCR | Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.6 |
withdrawn | [WTS] [JSN] |
R3-173730 | Paging delivery over F1 | pCR | Huawei | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
not pursued | [WTS] [JSN] |
R3-173731 | RRC connection reestablish procedure for CU-DU | pCR | Huawei | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.4 |
withdrawn | [WTS] [JSN] |
R3-173732 | Introduction of gNB-DU UE F1AP ID over F1 | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
endorsed | [WTS] [JSN] | |
R3-173733 | TP of centroal retransmission of lost PDUs to 38.401 | pCR | Huawei | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
not pursued | [WTS] [JSN] |
R3-173734 | Temporary slice unavailable handling in Xn HO | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] | |
R3-173735 | Temporary slice unavailable handling in Xn HO (P-CR 38.413) | pCR | Qualcomm Incorporated | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173736 | UE capablity Indication (P-CR 38.413) | pCR | Qualcomm Incorporated | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173737 | UE capablity Indication (P-CR 38.410) | pCR | Qualcomm Incorporated | 38.41 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173738 | Radio Capability Check for IMS Voice | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
noted | [WTS] [JSN] | |
R3-173739 | Radio Capability Check Procedure (P-CR 38.413) | pCR | Qualcomm Incorporated | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
noted | [WTS] [JSN] |
R3-173740 | Paging procedure (P-CR 38.413) | pCR | Qualcomm Incorporated | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173741 | Feedback of DL RRC Delivery over MCG Split SRB | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.5 |
noted | [WTS] [JSN] | |
R3-173742 | Feedback of DL RRC Delivery over MCG Split SRB (P-CR 36.423) | other | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.5 |
withdrawn | [WTS] [JSN] | |
R3-173743 | Feedback of DL RRC Delivery over MCG Split SRB (P-CR 38.423) | pCR | Qualcomm Incorporated | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.4 |
not pursued | [WTS] [JSN] |
R3-173744 | Data forwarding in HO | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
noted | [WTS] [JSN] | |
R3-173745 | Data forwarding in HO (P-CR 38.300) | pCR | Qualcomm Incorporated | 38.3 14.4.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
withdrawn | [WTS] [JSN] |
R3-173746 | U-plane flow control | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
noted | [WTS] [JSN] | |
R3-173747 | Fast retransmission and UP switching | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
not pursued | [WTS] [JSN] | |
R3-173748 | F1-U Fast retransmission (P-CR 38.475) | pCR | Qualcomm Incorporated | 38.475 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
withdrawn | [WTS] [JSN] |
R3-173749 | Xn Flow control (P-CR 38.425) | pCR | Qualcomm Incorporated | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
withdrawn | [WTS] [JSN] |
R3-173750 | Stage 2 TP for X2 setup and configuration update between an eNB and a gNB |
other revised to R3-174111 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core |
R3-97 AI: 10.3.3 |
revised | [WTS] [JSN] | ||
R3-173751 | Information for EN-DC X2 setup and configuration update | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core |
R3-97 AI: 10.3.3 |
noted | [WTS] [JSN] | ||
R3-173752 | Stage 3 TP for EN-DC X2 Setup and Configuration Update | other | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
not pursued | [WTS] [JSN] | |
R3-173753 | TNL address discovery based on intermediate node | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | ||
R3-173754 | Discussion on capability indication for downlink NAS data PDU acknowledgment | discussion | Nokia, Nokia Shanghai Bell |
R3-97 AI: 9.2 |
noted | [WTS] [JSN] | |||
R3-173755 | Correction of reliable DL NAS delivery | CR | Nokia, Nokia Shanghai Bell | 36.413 14.4.0 CR#1540 catF | TEI14, CIoT_Ext | Rel-14 |
R3-97 AI: 9.2 |
noted | [WTS] [JSN] |
R3-173756 | Impact on S1 PAGING in case of Restriction of use of Enhanced Coverage | discussion | Nokia, Nokia Shanghai Bell |
R3-97 AI: 9.2 |
noted | [WTS] [JSN] | |||
R3-173757 | Enhanced Coverage Restricted Indication for Paging | CR | Nokia, Nokia Shanghai Bell | 36.413 14.4.0 CR#1541 catF | TEI14, CIoT_Ext, NB_IOTenh-Core | Rel-14 |
R3-97 AI: 9.2 |
not pursued | [WTS] [JSN] |
R3-173758 | Some Considerations on the Backhaul Signalling for LTE-NR Coexistence |
discussion revised to R3-174099 |
China Telecommunications |
R3-97 AI: 10.14 |
revised | [WTS] [JSN] | |||
R3-173759 | Discussion on F1 interface Setup Procedure | discussion | China Telecommunications |
R3-97 AI: 10.10.2.1 |
noted | [WTS] [JSN] | |||
R3-173760 | Text Proposal for Reference QoS profile | pCR | Nokia, Nokia Shanghai Bell, Intel Corporation, LG Electronics | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.1.2 |
noted | [WTS] [JSN] |
R3-173761 | Reply LS on default DRB establishment for PDU session |
LS out LS To: RAN2 |
Nokia, Nokia Shanghai Bell |
R3-97 AI: 10.1.2 |
withdrawn | [WTS] [JSN] | |||
R3-173762 | Format of NG-U Encapsulation Header | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.1.4 |
noted | [WTS] [JSN] | |
R3-173763 | Skeleton for NG user plane format | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.1.4 |
noted | [WTS] [JSN] | |
R3-173764 | Specification of the NG user plane format | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.1.4 |
noted | [WTS] [JSN] | |
R3-173765 | LS on defining GTP extension header for 5G |
LS out LS To: TSG WG CT4 revised to R3-174193 |
Nokia, Nokia Shanghai Bell | Rel-15 |
R3-97 AI: 10.1.4 |
revised | [WTS] [JSN] | ||
R3-173766 | Text Proposal for QoS Handling in Dual Connectivity 5GC |
pCR revised to R3-174110 |
Nokia, Nokia Shanghai Bell | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.1.5 |
revised | [WTS] [JSN] |
R3-173767 | Text Proposal for configuration of default AMF set | pCR | Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173768 | Text Proposal for slice-based admission control at SN | pCR | Nokia, Nokia Shanghai Bell | 38.423 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173769 | Text Proposal for Slice information in Path Switch Request | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173770 | Text Proposal for Configuration of Network Slicing over NG | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173771 | Text Proposal for Configuration of Network Slicing over Xn | pCR | Nokia, Nokia Shanghai Bell | 38.423 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173772 | Text Proposal for slice temporarily unavailable | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.2.2 |
withdrawn | [WTS] [JSN] |
R3-173773 | LS on unavailable Slices |
LS out LS To: SA2 |
Nokia, Nokia Shanghai Bell | Rel-15 |
R3-97 AI: 10.2.2 |
withdrawn | [WTS] [JSN] | ||
R3-173774 | Text Proposal for multiple SCTP for TS 38.412 | pCR | Nokia, Nokia Shanghai Bell | 38.412 0.1.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.5.1 |
withdrawn | [WTS] [JSN] |
R3-173775 | Lossless Handover and Data forwarding of QoS Flows | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R3-97 AI: 10.5.2 |
noted | [WTS] [JSN] | ||
R3-173776 | Text Proposal for Lossless Handover and Data forwarding | pCR | Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.2 |
not pursued | [WTS] [JSN] |
R3-173777 | Text Proposal for Unreachability in RRC Inactive State |
pCR revised to R3-174188 |
Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6 |
revised | [WTS] [JSN] |
R3-173778 | Text Proposal for RAN Notification Area | pCR | Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.1 |
withdrawn | [WTS] [JSN] |
R3-173779 | Text Proposal for RRC Inactive Assistance Information | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.6.2 |
noted | [WTS] [JSN] |
R3-173780 | Text Proposal for NG-RAN Paging Priority | pCR | Nokia, Nokia Shanghai Bell | 38.423 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.6.3 |
not pursued | [WTS] [JSN] |
R3-173781 | Text Proposal for data forwarding at Intersystem Handover |
pCR revised to R3-174176 |
Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
revised | [WTS] [JSN] |
R3-173782 | Text Proposal for stage 3 Intersystem Handover | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.7.3 |
withdrawn | [WTS] [JSN] |
R3-173783 | Text Proposal for Rapporteur’s update for TS 38.410 |
pCR revised to R3-174104 |
Nokia, Nokia Shanghai Bell | 38.41 0.4.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.11.4 |
revised | [WTS] [JSN] |
R3-173784 | Text Proposal for procedures for TS 38.410 | pCR | Nokia, Nokia Shanghai Bell | 38.41 0.4.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.11.4 |
agreed | [WTS] [JSN] |
R3-173785 | Discussion on bearer modification | pCR | LG Electronics, KT Corp. | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.2.2 |
withdrawn | [WTS] [JSN] |
R3-173786 | Issues on Inter-gNB-DU Mobility procedure | pCR | LG Electronics | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.6 |
not pursued | [WTS] [JSN] |
R3-173787 | Discussion on paging function | pCR | LG Electronics, KT Corp. | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.7 |
not pursued | [WTS] [JSN] |
R3-173788 | Issues on Initial UE Access procedure | pCR | LG Electronics, KT Corp. | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.5 |
not pursued | [WTS] [JSN] |
R3-173789 | Skeleton of TR 37.876 V0.0.1 | draft TR | China Unicom | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12 |
endorsed | [WTS] [JSN] | |
R3-173790 | TP for updates on TR 37.876 |
pCR revised to R3-174166 |
China Unicom, Orange, Huawei, HiSilicon | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12 |
revised | [WTS] [JSN] |
R3-173791 | Paging failure for CE mode capable UE | discussion | NTT DOCOMO INC. | TEI13 |
R3-97 AI: 9.2 |
noted | [WTS] [JSN] | ||
R3-173792 | Introduction of UE Radio Capability for Paging request | CR | NTT DOCOMO INC. | 36.413 14.4.0 CR#1542 catB | TEI13 | Rel-14 |
R3-97 AI: 9.2 |
not pursued | [WTS] [JSN] |
R3-173793 | System Information message exchange over F1 | discussion | Intel Corporation | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] | ||
R3-173794 | On multiple SCTP associations for NG-C | discussion | Intel Corporation | Rel-15 |
R3-97 AI: 10.5.1 |
noted | [WTS] [JSN] | ||
R3-173795 | [DRAFT] LS on multiple SCTP associations |
LS out LS To: TSG WG SA2 revised to R3-174179 |
Intel Corporation | Rel-15 |
R3-97 AI: 10.5.1 |
revised | [WTS] [JSN] | ||
R3-173796 | Rapporteur's update of TS 38.474 | draft TS | Intel Corporation | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.4 |
agreed | [WTS] [JSN] | |
R3-173797 | Reference QoS profile for default DRB | discussion | Intel Corporation Nokia, Nokia Shanghai Bell, LGE | Rel-15 |
R3-97 AI: 10.1.2 |
noted | [WTS] [JSN] | ||
R3-173798 | Consideration for mobility across different RAs | discussion | Intel Corporation | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] | |
R3-173799 | Data Forwarding in intra-system HO | discussion | Intel Corporation | Rel-15 |
R3-97 AI: 10.5.5 |
noted | [WTS] [JSN] | ||
R3-173800 | Further Consideration on RAN paging failure handling | pCR | Intel Coporation, Huawei | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.3 |
not pursued | [WTS] [JSN] |
R3-173801 | Stage-2 TP for NG Context Fetch in inactive state | pCR | Intel Coporation Huawei | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.4 |
withdrawn | [WTS] [JSN] |
R3-173802 | Guard time after the expiry of the RAN-based Notification Area Update (RNAU) timer | pCR | Intel Corporation, Qualcomm Incorporated | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.6.5 |
withdrawn | [WTS] [JSN] |
R3-173803 | Stage 2 TP for guard time after the expiry of the RNAU timer | pCR | Intel Corporation, Qualcomm Incorporated | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.5 |
withdrawn | [WTS] [JSN] |
R3-173804 | Flow Control enhancements for PDCP duplication | discussion | Intel Corporation, Altiostar Network | Rel-15 |
R3-97 AI: 10.8.3.3 |
noted | [WTS] [JSN] | ||
R3-173805 | Procedures for Network Slicing in RAN with the Separation of CU-CP and CU-UP | discussion | Intel Corporation | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] | ||
R3-173806 | Enhancements for intra CU-CP handover in NG-RAN with separated CP and UP | discussion | Intel Corporation | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] | ||
R3-173807 | Xn Handover in NG-RAN with separated CP and UP | discussion | Intel Corporation | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] | ||
R3-173808 | Considerations for Data Forwarding in NG-RAN | discussion | KT Corp. | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
noted | [WTS] [JSN] | |
R3-173809 | Baseline CR to TS 36.413 covering agreements of RAN3 #97 |
CR revision of R3-173454 revised to R3-174251 |
Nokia, Nokia Shanghai Bell | 36.413 14.4.0 CR#15243 catB | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.3.4 |
agreed | [WTS] [JSN] |
R3-173810 | Resource Management for Separation of CP and UP in CU | discussion | KT Corp. | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] | |
R3-173811 | Rapporteur Moving F1 interface related chapters from 38.401 to 38.470 | discussion | NEC, Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.3 |
agreed | [WTS] [JSN] | |
R3-173812 | Solving some FFS in 38.401v030 |
pCR revised to R3-174103 |
NEC | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.3 |
revised | [WTS] [JSN] |
R3-173813 | Text Proposal for QoS Flow Level Parameters |
pCR revised to R3-174105 |
NEC | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.1.1 |
revised | [WTS] [JSN] |
R3-173814 | RAN paging failure handling in RRC_INACTIVE |
pCR revised to R3-174187 |
NEC | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.3 |
revised | [WTS] [JSN] |
R3-173815 | L1/L2 resource configuration Information in F1AP | pCR | NEC | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
not pursued | [WTS] [JSN] |
R3-173816 | Cell Activation and procedure | pCR | NEC | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.8 |
not pursued | [WTS] [JSN] |
R3-173817 | Cell Activation and procedure | pCR | NEC | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.8 |
withdrawn | [WTS] [JSN] |
R3-173818 | Secondary RAT Usage Data Report impact on RAN3 specifications | discussion | NEC | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
noted | [WTS] [JSN] | |
R3-173819 | Secondary RAT Usage Data Report function | draftCR | NEC | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
withdrawn | [WTS] [JSN] | |
R3-173820 | System information message encoding | pCR | NEC | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173821 | Complexity evaluation for LLS Options 6 and 7 | discussion | NEC | NR_newRAT-Core | Rel-15 |
R3-97 AI: 11 |
noted | [WTS] [JSN] | |
R3-173822 | TP for Data Forwarding in intra-system Handover | pCR | Samsung | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
not pursued | [WTS] [JSN] |
R3-173823 | TP for Data Forwarding in intra-system Handover | pCR | Samsung | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
withdrawn | [WTS] [JSN] |
R3-173824 | TP for Supporting MN Initiate SN Change |
pCR revised to R3-174181 |
Samsung | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
revised | [WTS] [JSN] |
R3-173825 | TP for Supporting MN Initiate SN Change |
draftCR revised to R3-174182 |
Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
revised | [WTS] [JSN] | |
R3-173826 | TP for AMBRconfiguration for EN-DC (stage 2)-Solution 1 | pCR | Samsung | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.8 |
not pursued | [WTS] [JSN] |
R3-173827 | TP for AMBR configuration for EN-DC (stage 3)-Solution 1 | draftCR | Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.8 |
withdrawn | [WTS] [JSN] | |
R3-173828 | TP for AMBR configuration for EN-DC (stage 2)-Solution 2 | pCR | Samsung | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.8 |
withdrawn | [WTS] [JSN] |
R3-173829 | TP for AMBR configuration for EN-DC (stage 3)-Solution 2 | draftCR | Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.8 |
withdrawn | [WTS] [JSN] | |
R3-173830 | TP for NG tunnelling to support dual Connectivity | pCR | Samsung | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.2 |
withdrawn | [WTS] [JSN] |
R3-173831 | Issues on system information management function | pCR | LG Electronics | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173832 | Support of Inter-system handover with E-UTRAN | pCR | Samsung | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.2 |
agreed | [WTS] [JSN] |
R3-173833 | Support of inter-system handover with NG-RAN | draftCR | Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.2 |
withdrawn | [WTS] [JSN] | |
R3-173834 | Data forwarding for Inter-system handover from 5GS to EPS |
pCR revised to R3-174177 |
Samsung | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
revised | [WTS] [JSN] |
R3-173835 | Support of data forwarding for inter-system handover from 5GS to EPS(Alt. 2) | draftCR | Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
withdrawn | [WTS] [JSN] | |
R3-173836 | Data forwarding for Inter-system handover from EPS to 5GS | pCR | Samsung | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
withdrawn | [WTS] [JSN] |
R3-173837 | Support of data forwarding for inter-system handover from EPS to 5GS to EPS(Alt. 1) | draftCR | Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
withdrawn | [WTS] [JSN] | |
R3-173838 | Support of data forwarding for inter-system handover from EPS to 5GS to EPS(Alt. 2) | draftCR | Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
withdrawn | [WTS] [JSN] | |
R3-173839 | Stage2 TP on RRC Inactive Assistant Information |
pCR revised to R3-174185 |
Samsung | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.2 |
revised | [WTS] [JSN] |
R3-173840 | Stage3 TP on RRC Inactive Assistant Information |
pCR revised to R3-174186 |
Samsung | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.2 |
revised | [WTS] [JSN] |
R3-173841 | Stage2 TP on RRC Inactive Transition Report | pCR | Samsung | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.5 |
withdrawn | [WTS] [JSN] |
R3-173842 | Stage3 TP on RRC Inactive Transition Report | pCR | Samsung | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.5 |
withdrawn | [WTS] [JSN] |
R3-173843 | Discussions on NCI and gNB ID | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
noted | [WTS] [JSN] | |
R3-173844 | Discussions on the necessity of gNB-DU ID | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.2 |
noted | [WTS] [JSN] | |
R3-173845 | Discussions on system information in CU-DU split | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173846 | Discussions on system information message delivery between gNB-CU and gNB-DU | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] |
R3-173847 | Discussions on initial access procedure within high-layer split | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
not pursued | [WTS] [JSN] |
R3-173848 | Discussions on INACTIVE to CONNECTED RRC transition within high-layer split | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
withdrawn | [WTS] [JSN] |
R3-173849 | Discussions on mobility procedures within CU-DU split | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.6 |
not pursued | [WTS] [JSN] |
R3-173850 | Discussions on gNB-DU start-up procedure | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.8 |
not pursued | [WTS] [JSN] |
R3-173851 | Centralized retransmission for multi-connectivity case | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
not pursued | [WTS] [JSN] |
R3-173852 | Discussions on C-RNTI allocations with CU-DU split | pCR | Samsung | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1. |
not pursued | [WTS] [JSN] |
R3-173853 | Discussions on F1 setup procedure | pCR | Samsung | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
not pursued | [WTS] [JSN] |
R3-173854 | Discussions on cell information in UE context setup procedure over F1 | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
not pursued | [WTS] [JSN] |
R3-173855 | Stage 3 TP on cell information in UE context setup procedure over F1 | pCR | Samsung | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
withdrawn | [WTS] [JSN] |
R3-173856 | Discussions on UE context modification procedure over F1 | pCR | Samsung | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
withdrawn | [WTS] [JSN] |
R3-173857 | Further discussions on PDCP duplication in high-layer split | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] | |
R3-173858 | Discussions on cell management function over F1 interface | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173859 | Discussions on gNB-CU/DU configuration update procedures | pCR | Samsung | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
not pursued | [WTS] [JSN] |
R3-173860 | Design of backhaul signaling for harmonic interference handling | discussion | vivo | Rel-15 |
R3-97 AI: 10.14 |
noted | [WTS] [JSN] | ||
R3-173861 | Support of location reporting function in NG-RAN | pCR | Huawei | 38.41 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173862 | TP for 38.413 for Support of location reporting function in NG-RAN | pCR | Huawei | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173863 | TP for 38.423 for Support of location reporting function in NG-RAN | pCR | Huawei | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173864 | RAN-based Notification Area Allocation | pCR | Huawei | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.1 |
not pursued | [WTS] [JSN] |
R3-173865 | Discussion on Control of Non-GBR QoS Flows | discussion | Huawei |
R3-97 AI: 10.1.5 |
not pursued | [WTS] [JSN] | |||
R3-173866 | [Draft] LS on Non-GBR QoS Profile Distribution |
LS out LS To: SA2 |
Huawei |
R3-97 AI: 10.1.5 |
withdrawn | [WTS] [JSN] | |||
R3-173867 | SN change considerations for delta configuration | discussion | HTC Corporation | NR_newRAT-Core |
R3-97 AI: 10.8.1.3 |
noted | [WTS] [JSN] | ||
R3-173868 | QoS Parameters in Xn Handover Request | discussion | Huawei |
R3-97 AI: 10.1.1 |
noted | [WTS] [JSN] | |||
R3-173869 | TP for 37.340 on supporting delta signalling for SN change | pCR | HTC Corporation | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
withdrawn | [WTS] [JSN] |
R3-173870 | TP for 36.423 on supporting delta signalling for SN change | draftCR | HTC Corporation | NR_newRAT-Core | Rel-14 |
R3-97 AI: 10.8.1.3 |
withdrawn | [WTS] [JSN] | |
R3-173871 | Discussion on paging assistance information in RRC-INACTIVE state | pCR | LG Electronics | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.6.2 |
noted | [WTS] [JSN] |
R3-173872 | Considering CN selective awareness for RRC-INACTIVE state | pCR | LG Electronics | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.6.5 |
withdrawn | [WTS] [JSN] |
R3-173873 | Xn-based handover across registration areas | pCR | LG Electronics | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173874 | Issues on RRC-INACTIVE state in CU-DU split | pCR | LG Electronics | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173875 | Control of PHY layer parameters | discussion | IAESI |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] | |||
R3-173876 | X2AP Procedures Affected by NR Cell ID Length and Variable Length gNB ID | discussion | VODAFONE Group Plc |
R3-97 AI: 10.8.1.2 |
noted | [WTS] [JSN] | |||
R3-173877 | Energy Efficiency Solution of 3X Dual Connectivity Architecture | discussion | VODAFONE Group Plc |
R3-97 AI: 10.8.1.3 |
noted | [WTS] [JSN] | |||
R3-173878 | TP on L1 processing diagram | discussion | NTT DOCOMO, INC. | FS_NR_CU_DU_LLS | Rel-15 |
R3-97 AI: 11.1 |
not pursued | [WTS] [JSN] | |
R3-173879 | F1 parameter control update | discussion | NTT DOCOMO, INC. | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] | |
R3-173880 | State information reporting over F1 | discussion | NTT DOCOMO, INC. | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
not pursued | [WTS] [JSN] | |
R3-173881 | Evaluation on the required fronthaul bandwidth | discussion | NTT DOCOMO, INC. | FS_NR_CU_DU_LLS | Rel-15 |
R3-97 AI: 11.2 |
not pursued | [WTS] [JSN] | |
R3-173882 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173883 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173884 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173885 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173886 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173887 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173888 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173889 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173890 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173891 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-173892 | Introduction of new IEs in X2 for high performing load balancing | discussion | CMCC |
R3-97 AI: 9.2 |
noted | [WTS] [JSN] | |||
R3-173893 | Introduction of new IEs in X2 for high performing load balance | CR | CMCC | 36.423 13.7.0 CR#1043 catF | TEI13 | Rel-13 |
R3-97 AI: 9.2 |
not pursued | [WTS] [JSN] |
R3-173894 | Xn based mobility for slicing across RA | pCR | Huawei | 38.3 1.0.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173895 | Capturing agreements from RAN3#97 in 38.470 | pCR | Huawei | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.4 |
agreed | [WTS] [JSN] |
R3-173896 | Capturing agreements from RAN3#97 in 38.473 | pCR | Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.3.3 |
agreed | [WTS] [JSN] |
R3-173897 | Proposed plan for adding ASN.1 to 38.473 |
pCR revised to R3-174098 |
Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.3.3 |
revised | [WTS] [JSN] |
R3-173898 | Clarification on Allowed NSSAI | pCR | Huawei | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2 |
withdrawn | [WTS] [JSN] |
R3-173899 | [DRAFT] LS regarding Allowed NSSAI |
LS out LS To: SA2 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2 |
withdrawn | [WTS] [JSN] | |
R3-173900 | Temporary slicing unavailability | pCR | Huawei | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.2 |
withdrawn | [WTS] [JSN] |
R3-173901 | 5GC involved inter registration area mobility | pCR | Huawei | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173902 | NG Reset update | pCR | Huawei | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173903 | Slicing information transfer | pCR | Huawei | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173904 | TP on slicing information for Xn messages | pCR | Huawei | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173905 | Introduction of new IEs in X2 for high performing load balance |
CR revised to R3-174117 |
CMCC | 36.423 14.4.0 CR#1044 catA | TEI14 | Rel-14 |
R3-97 AI: 9.2 |
revised | [WTS] [JSN] |
R3-173906 | Cell deactivation and reactivation via F1 interface for energy saving | discussion | CMCC |
R3-97 AI: 10.10.1.8 |
withdrawn | [WTS] [JSN] | |||
R3-173907 | Open issue on F1 Setup procedure | pCR | LG Electronics | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
not pursued | [WTS] [JSN] |
R3-173908 | Support of paging in F1 | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
noted | [WTS] [JSN] | |
R3-173909 | Corrections to BL CR for EN-DC | other | Huawei, Nokia, Nokia Shanghai Bell, ZTE, Intel Corporation | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] | |
R3-173910 | Transport of RRC message for EN-DC | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
noted | [WTS] [JSN] | |
R3-173911 | Considerations on Counter Check procedure | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
not pursued | [WTS] [JSN] | |
R3-173912 | Support of delta signalling during MN initiated SN change | pCR | Huawei | 37.34 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
not pursued | [WTS] [JSN] |
R3-173913 | Stage-3 for support of delta signalling | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
not pursued | [WTS] [JSN] | |
R3-173914 | Support of SCG SRB | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.5 |
noted | [WTS] [JSN] | |
R3-173915 | Considerations on container for common PDCP | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.6 |
noted | [WTS] [JSN] | |
R3-173916 | UE-AMBR enforcement for Option 3 family |
pCR revised to R3-174194 |
Huawei | 37.34 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.8 |
revised | [WTS] [JSN] |
R3-173917 | QoS and Slice for Option 7 | pCR | Huawei | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
withdrawn | [WTS] [JSN] |
R3-173918 | UE-AMBR enforcement for Option 7 family | pCR | Huawei | 37.34 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.7 |
not pursued | [WTS] [JSN] |
R3-173919 | Consideration of DL Data Delivery Status triggering | discussion | Huawei, Intel Corporation | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
noted | [WTS] [JSN] | |
R3-173920 | Flow control to support RLC UM | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
noted | [WTS] [JSN] | |
R3-173921 | TP on flow control to support RLC UM | pCR | Huawei | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
withdrawn | [WTS] [JSN] |
R3-173922 | PDCP duplication for EN-DC | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.3 |
noted | [WTS] [JSN] | |
R3-173923 | Secondary RAT data volume reporting |
pCR revised to R3-174210 |
Huawei | 37.34 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
revised | [WTS] [JSN] |
R3-173924 | Introduction of secondary RAT data volume reporting over S1 | other | Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
withdrawn | [WTS] [JSN] | |
R3-173925 | Introduction of secondary RAT data volume reporting over X2 |
other revised to R3-174203 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
revised | [WTS] [JSN] | |
R3-173926 | Possible RAN3 impacts for QMC | discussion | Huawei | LTE_QMC_Streaming | Rel-15 |
R3-97 AI: 17.1 |
noted | [WTS] [JSN] | |
R3-173927 | Introduction of QoE Measurement Collection for LTE |
CR revised to R3-174164 |
Huawei | 36.413 14.4.0 CR#1543 catB | LTE_QMC_Streaming | Rel-15 |
R3-97 AI: 17.1 |
revised | [WTS] [JSN] |
R3-173928 | Introduction of QoE Measurement Collection for LTE |
CR revised to R3-174585 |
Huawei | 36.423 14.4.0 CR#1045 catB | LTE_QMC_Streaming | Rel-15 |
R3-97 AI: 17.1 |
endorsed | [WTS] [JSN] |
R3-173929 | Correction of mismatched tabular and ASN.1 | CR | Ericsson | 36.423 14.4.0 CR#1046 catF | NB_IOT-Core, TEI14 | Rel-14 |
R3-97 AI: 9.2 |
agreed | [WTS] [JSN] |
R3-173930 | Discussion on QoS setting for default DRBs | discussion | Ericsson | NR_newRAT-Core |
R3-97 AI: 10.1.2 |
noted | [WTS] [JSN] | ||
R3-173931 | Slice configuration at NG and Xn Setup | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173932 | Slice configuration at Xn Setup | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173933 | Mobility procedures for Slicing | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173934 | Mobility procedures for Slicing | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173935 | On X2 TNL Address discovery for option 3 | other | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | |
R3-173936 | On X2 TNL Address discovery for option 3 – stage 3 TP | other | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | |
R3-173937 | TAC Extension for NR and NG-RAN | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
not pursued | [WTS] [JSN] |
R3-173938 | TAC Extension for NR and NG-RAN – Stage 2 | pCR | Ericsson | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
postponed | [WTS] [JSN] |
R3-173939 | [DRAFT] LS on Extending TAC for NR and NG-RAN (To: RAN2, SA2) |
LS out LS To: RAN2, SA2 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
withdrawn | [WTS] [JSN] | |
R3-173940 | Data forwarding at handover | pCR | Ericsson | 38.42 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
not concluded | [WTS] [JSN] |
R3-173941 | PDU session vs PDU session resource | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173942 | PDU session vs PDU session resource | pCR | Ericsson | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173943 | Handling of PDU session resources at connection set-up | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-173944 | RAN Paging in the absence of Xn connectivity | pCR | Ericsson, Vodafone | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.3 |
not pursued | [WTS] [JSN] |
R3-173945 | UE Context Retrieval in the absence of Xn connectivity | pCR | Ericsson, Vodafone | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.4 |
not pursued | [WTS] [JSN] |
R3-173946 | Inter System Data Forwarding | pCR | Ericsson | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
not pursued | [WTS] [JSN] |
R3-173947 | Bearers for Dual Connectivity – Bearer harmonisation | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.4 |
noted | [WTS] [JSN] | |
R3-173948 | Stage 2 TP for bearer harmonisation | pCR | Ericsson | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.4 |
withdrawn | [WTS] [JSN] |
R3-173949 | X2 TP for bearer harmonisation | other | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.4 |
withdrawn | [WTS] [JSN] | |
R3-173950 | Data volume reporting of Secondary RAT usage |
other revised to R3-174106 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
revised | [WTS] [JSN] | |
R3-173951 | S1AP TP Data volume reporting of Secondary RAT usage |
other revised to R3-174107 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
revised | [WTS] [JSN] | |
R3-173952 | MN and SN role for QoS flow to DRB mapping |
pCR revised to R3-174160 |
Ericsson | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.3 |
revised | [WTS] [JSN] |
R3-173953 | PDU session split at UPF | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.3 |
withdrawn | [WTS] [JSN] |
R3-173954 | PDU Session, QoS flow and DRB control for NG-RAN DC | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.3 |
withdrawn | [WTS] [JSN] |
R3-173955 | On capturing UP in a single spec | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
noted | [WTS] [JSN] | |
R3-173956 | Enhancement on the Downlink Data Delivery Status | pCR | Ericsson | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
not pursued | [WTS] [JSN] |
R3-173957 | GTP-U RAN Container for X2-UP, Xn-UP and F1-UP | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
noted | [WTS] [JSN] | |
R3-173958 | Discard the duplicated transmissions of PDCP PDUs | pCR | Ericsson | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.3 |
not pursued | [WTS] [JSN] |
R3-173959 | TNL solution for F1-C | pCR | Ericsson | 38.472 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.1 |
not pursued | [WTS] [JSN] |
R3-173960 | TNL solution for F1-C | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.1 |
not pursued | [WTS] [JSN] |
R3-173961 | Ownership and delivery of system information | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
not pursued | [WTS] [JSN] |
R3-173962 | Encoding of system information | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
noted | [WTS] [JSN] | |
R3-173963 | Other SI delivery command | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
not pursued | [WTS] [JSN] |
R3-173964 | Initial UE Access | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
not pursued | [WTS] [JSN] |
R3-173965 | Initial UE Access and bearer configuration | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
not pursued | [WTS] [JSN] |
R3-173966 | Inactive to connected | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
withdrawn | [WTS] [JSN] |
R3-173967 | Intra-gNB-CU mobility procedures | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.6 |
not pursued | [WTS] [JSN] |
R3-173968 | Paging in disaggregated gNB | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
not pursued | [WTS] [JSN] |
R3-173969 | F1 startup and cells activation | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.8 |
not pursued | [WTS] [JSN] |
R3-173970 | Details on fast retransmission of lost PDUs | pCR | Ericsson, AT&T | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
not pursued | [WTS] [JSN] |
R3-173971 | TP for Radio Link Outage and Retransmission notification | pCR | Ericsson, AT&T | 38.475 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
not pursued | [WTS] [JSN] |
R3-173972 | F1 setup request and response | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
not pursued | [WTS] [JSN] |
R3-173973 | UE context Setup over the F1 | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
not pursued | [WTS] [JSN] |
R3-173974 | Configuration update | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
not pursued | [WTS] [JSN] |
R3-173975 | gNB-CU and gNB-DU configuration update | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-173976 | TP for 38.423 with Rapporteurs updates | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.3.2 |
agreed | [WTS] [JSN] |
R3-173977 | Correction on TS 38.423 |
pCR revised to R3-174097 |
Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.3.2 |
revised | [WTS] [JSN] |
R3-173978 | TP for 38.425 with Rapporteurs updates | pCR | Ericsson | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.5.1 |
agreed | [WTS] [JSN] |
R3-173979 | Proposed content for NRPPa section 4 and 5 | pCR | Ericsson | 38.455 0.1.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.13.2 |
agreed | [WTS] [JSN] |
R3-173980 | Scope of Low Layer Split Architectures | discussion | Ericsson | FS_NR_CU_DU_LLS | Rel-15 |
R3-97 AI: 11.1 |
noted | [WTS] [JSN] | |
R3-173981 | GNSS Assistance Data Procedure in LPPa | discussion | Ericsson | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.1 |
noted | [WTS] [JSN] | |
R3-173982 | Signaling GNSS/RTK Assistance Data in LPPa | discussion | Ericsson | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.2 |
noted | [WTS] [JSN] | |
R3-173983 | Discussion on QoS setting for default DRBs | discussion | Ericsson | NR_newRAT-Core |
R3-97 AI: 10.1.2 |
withdrawn | [WTS] [JSN] | ||
R3-173984 | Progress on Further enhancements on Video for LTE | discussion | Ericsson | LTE_ViLTE_enh2-Core | Rel-15 |
R3-97 AI: 16.1 |
not concluded | [WTS] [JSN] | |
R3-173985 | [Draft LS] Progress update for Further enhancements on Video for LTE (To: RAN2) |
LS out LS To: RAN2 |
Ericsson | LTE_ViLTE_enh2-Core | Rel-15 |
R3-97 AI: 16.1 |
not concluded | [WTS] [JSN] | |
R3-173986 | Further discussion on QoE for streaming services in E-UTRAN | discussion | Ericsson | LTE_QMC_Streaming-Core | Rel-15 |
R3-97 AI: 17.1 |
noted | [WTS] [JSN] | |
R3-173987 | Introduction of UE QoE measurement support capability over S1 | CR | Ericsson | 36.413 14.4.0 CR#1544 catB | LTE_QMC_Streaming-Core | Rel-15 |
R3-97 AI: 17.1 |
withdrawn | [WTS] [JSN] |
R3-173988 | RAN3 Impact: Work Item on a simplified HS-SCCH for UMTS | discussion | Ericsson | UTRA_simple_HSSCCH-Core | Rel-15 |
R3-97 AI: 18.3 |
noted | [WTS] [JSN] | |
R3-173989 | Support on a simplified HS-SCCH for UMTS |
CR revised to R3-174824 |
Ericsson | 25.423 14.2.0 CR#1901 catB | UTRA_simple_HSSCCH-Core | Rel-15 |
R3-97 AI: 18.3 |
endorsed | [WTS] [JSN] |
R3-173990 | Support on a simplified HS-SCCH for UMTS |
CR revised to R3-174825 |
Ericsson | 25.433 14.1.0 CR#2095 catB | UTRA_simple_HSSCCH-Core | Rel-15 |
R3-97 AI: 18.3 |
endorsed | [WTS] [JSN] |
R3-173991 | Introduction to Rapporteur Update TR 38.806 |
pCR revised to R3-174143 |
Ericsson | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
revised | [WTS] [JSN] |
R3-173992 | Update to the CP-UP scenarios | pCR | Ericsson, Vodafone, Charter Communications, AT&T | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
not pursued | [WTS] [JSN] |
R3-173993 | Resolution of E1 open issues – standardization | pCR | Ericsson, Vodafone, Charter Communications, AT&T | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
not pursued | [WTS] [JSN] |
R3-173994 | E1 interface functions | pCR | Ericsson, Vodafone, Charter Communications, AT&T | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
not concluded | [WTS] [JSN] |
R3-173995 | Xn handover with E1 | pCR | Ericsson, Vodafone, AT&T | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] |
R3-173996 | SgNB addition with E1 | pCR | Ericsson, Vodafone, AT&T | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] |
R3-173997 | Idle to connected state transition with E1 | pCR | Ericsson, Vodafone, Charter Communications, AT&T | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.2 |
not concluded | [WTS] [JSN] |
R3-173998 | Slice configuration at NG and Xn Setup | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-173999 | Slice configuration at Xn Setup | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-174000 | Mobility procedures for Slicing | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-174001 | Mobility procedures for Slicing | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-174002 | On X2 TNL Address discovery for option 3 | other | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | |
R3-174003 | On X2 TNL Address discovery for option 3 – stage 3 TP | other | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.1 |
postponed | [WTS] [JSN] | |
R3-174004 | TAC Extension for NR and NG-RAN | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
withdrawn | [WTS] [JSN] |
R3-174005 | TAC Extension for NR and NG-RAN – Stage 2 | pCR | Ericsson | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
withdrawn | [WTS] [JSN] |
R3-174006 | [DRAFT] LS on Extending TAC for NR and NG-RAN (To: RAN2, SA2) |
LS out LS To: RAN2, SA2 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
withdrawn | [WTS] [JSN] | |
R3-174007 | Data forwarding at handover | pCR | Ericsson | 38.42 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
withdrawn | [WTS] [JSN] |
R3-174008 | PDU session vs PDU session resource | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-174009 | PDU session vs PDU session resource | pCR | Ericsson | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-174010 | Handling of PDU session resources at connection set-up | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] |
R3-174011 | RAN Paging in the absence of Xn connectivity | pCR | Ericsson, Vodafone | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.3 |
withdrawn | [WTS] [JSN] |
R3-174012 | UE Context Retrieval in the absence of Xn connectivity | pCR | Ericsson, Vodafone | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.4 |
withdrawn | [WTS] [JSN] |
R3-174013 | Inter System Data Forwarding | pCR | Ericsson | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
withdrawn | [WTS] [JSN] |
R3-174014 | Bearers for Dual Connectivity – Bearer harmonisation | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.4 |
withdrawn | [WTS] [JSN] | |
R3-174015 | Stage 2 TP for bearer harmonisation | pCR | Ericsson | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.4 |
withdrawn | [WTS] [JSN] |
R3-174016 | X2 TP for bearer harmonisation | other | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.4 |
withdrawn | [WTS] [JSN] | |
R3-174017 | Data volume reporting of Secondary RAT usage | other | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
withdrawn | [WTS] [JSN] | |
R3-174018 | X2 TP Data volume reporting of Secondary RAT usage | other | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
withdrawn | [WTS] [JSN] | |
R3-174019 | MN and SN role for QoS flow to DRB mapping | pCR | Ericsson | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.3 |
withdrawn | [WTS] [JSN] |
R3-174020 | PDU session split at UPF | pCR | Ericsson | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.3 |
withdrawn | [WTS] [JSN] |
R3-174021 | PDU Session, QoS flow and DRB control for NG-RAN DC | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.3 |
withdrawn | [WTS] [JSN] |
R3-174022 | On capturing UP in a single spec | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
withdrawn | [WTS] [JSN] | |
R3-174023 | Enhancement on the Downlink Data Delivery Status | pCR | Ericsson | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
withdrawn | [WTS] [JSN] |
R3-174024 | GTP-U RAN Container for X2-UP, Xn-UP and F1-UP | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
withdrawn | [WTS] [JSN] | |
R3-174025 | Discard the duplicated transmissions of PDCP PDUs | pCR | Ericsson | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.3 |
withdrawn | [WTS] [JSN] |
R3-174026 | TNL solution for F1-C | pCR | Ericsson | 38.472 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.1 |
withdrawn | [WTS] [JSN] |
R3-174027 | TNL solution for F1-C | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.1 |
withdrawn | [WTS] [JSN] |
R3-174028 | Ownership and delivery of system information | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
withdrawn | [WTS] [JSN] |
R3-174029 | Encoding of system information | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
withdrawn | [WTS] [JSN] | |
R3-174030 | Other SI delivery command | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
withdrawn | [WTS] [JSN] |
R3-174031 | Initial UE Access | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
withdrawn | [WTS] [JSN] |
R3-174032 | Initial UE Access and bearer configuration | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
withdrawn | [WTS] [JSN] |
R3-174033 | Inactive to connected | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.5 |
withdrawn | [WTS] [JSN] |
R3-174034 | Intra-gNB-CU mobility procedures | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.6 |
withdrawn | [WTS] [JSN] |
R3-174035 | Paging in disaggregated gNB | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
withdrawn | [WTS] [JSN] |
R3-174036 | F1 startup and cells activation | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.8 |
withdrawn | [WTS] [JSN] |
R3-174037 | Details on fast retransmission of lost PDUs | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
withdrawn | [WTS] [JSN] |
R3-174038 | TP for Radio Link Outage and Retransmission notification | pCR | Ericsson | 38.475 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
withdrawn | [WTS] [JSN] |
R3-174039 | F1 setup request and response | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
withdrawn | [WTS] [JSN] |
R3-174040 | UE context Setup over the F1 | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.2 |
withdrawn | [WTS] [JSN] |
R3-174041 | Configuration update | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-174042 | gNB-CU and gNB-DU configuration update | pCR | Ericsson | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
withdrawn | [WTS] [JSN] |
R3-174043 | TP for 38.423 with Rapporteurs updates | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.3.2 |
withdrawn | [WTS] [JSN] |
R3-174044 | Correction on TS 38.423 | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.3.2 |
withdrawn | [WTS] [JSN] |
R3-174045 | TP for 38.425 with Rapporteurs updates | pCR | Ericsson | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.5.1 |
withdrawn | [WTS] [JSN] |
R3-174046 | Proposed content for NRPPa section 4 and 5 | pCR | Ericsson | 38.455 0.1.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.13.2 |
withdrawn | [WTS] [JSN] |
R3-174047 | Scope of Low Layer Split Architectures | discussion | Ericsson | FS_NR_CU_DU_LLS | Rel-15 |
R3-97 AI: 11.1 |
withdrawn | [WTS] [JSN] | |
R3-174048 | GNSS Assistance Data Procedure in LPPa | discussion | Ericsson | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.1 |
withdrawn | [WTS] [JSN] | |
R3-174049 | Signaling GNSS/RTK Assistance Data in LPPa | discussion | Ericsson | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.2 |
withdrawn | [WTS] [JSN] | |
R3-174050 | Signaling GNSS Positioning Enhancements | CR | Ericsson | 36.455 14.3.0 CR#81 catB | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.2 |
withdrawn | [WTS] [JSN] |
R3-174051 | Progress on Further enhancements on Video for LTE | discussion | Ericsson | LTE_ViLTE_enh2-Core | Rel-15 |
R3-97 AI: 16.1 |
withdrawn | [WTS] [JSN] | |
R3-174052 | [Draft LS] Progress update for Further enhancements on Video for LTE (To: RAN2) |
LS out LS To: RAN2 |
Ericsson | LTE_ViLTE_enh2-Core | Rel-15 |
R3-97 AI: 16.1 |
withdrawn | [WTS] [JSN] | |
R3-174053 | Further discussion on QoE for streaming services in E-UTRAN | discussion | Ericsson | LTE_QMC_Streaming-Core | Rel-15 |
R3-97 AI: 17.1 |
withdrawn | [WTS] [JSN] | |
R3-174054 | Introduction of UE QoE measurement support capability over S1 | CR | Ericsson | 36.413 14.4.0 CR#1545 catB | LTE_QMC_Streaming-Core | Rel-15 |
R3-97 AI: 17.1 |
withdrawn | [WTS] [JSN] |
R3-174055 | RAN3 Impact: Work Item on a simplified HS-SCCH for UMTS | discussion | Ericsson | UTRA_simple_HSSCCH-Core | Rel-15 |
R3-97 AI: 18.3 |
withdrawn | [WTS] [JSN] | |
R3-174056 | Support on a simplified HS-SCCH for UMTS | CR | Ericsson | 25.423 14.2.0 CR#1902 catB | UTRA_simple_HSSCCH-Core | Rel-15 |
R3-97 AI: 18.3 |
withdrawn | [WTS] [JSN] |
R3-174057 | Support on a simplified HS-SCCH for UMTS | CR | Ericsson | 25.433 14.1.0 CR#2096 catB | UTRA_simple_HSSCCH-Core | Rel-15 |
R3-97 AI: 18.3 |
withdrawn | [WTS] [JSN] |
R3-174058 | Introduction to Rapporteur Update TR 38.806 | pCR | Ericsson | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
withdrawn | [WTS] [JSN] |
R3-174059 | Update to the CP-UP scenarios | pCR | Ericsson, Vodafone | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
withdrawn | [WTS] [JSN] |
R3-174060 | Resolution of E1 open issues – standardization | pCR | Ericsson, Vodafone | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
withdrawn | [WTS] [JSN] |
R3-174061 | E1 interface functions | pCR | Ericsson, Vodafone | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
withdrawn | [WTS] [JSN] |
R3-174062 | Xn handover with E1 | pCR | Ericsson, Vodafone | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.2 |
withdrawn | [WTS] [JSN] |
R3-174063 | SgNB addition with E1 | pCR | Ericsson, Vodafone | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.2 |
withdrawn | [WTS] [JSN] |
R3-174064 | Idle to connected state transition with E1 | pCR | Ericsson, Vodafone | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.2 |
withdrawn | [WTS] [JSN] |
R3-174065 | Baseline CR to TS 36.423 covering agreements of RAN3 #97 |
CR revision of R3-173455 revised to R3-174252 |
Huawei, Ericsson, LG Electronics Inc., CATT, ZTE, Nokia, Nokia Shanghai Bell, Intel Corporation | 36.423 14.4.0 CR#10412 catB | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1 |
agreed | [WTS] [JSN] |
R3-174066 | MBMS Bearer Event Notification to GCS-AS for Mission Critical Services |
discussion revised to R3-174839 |
Motorola Solutions |
R3-97 AI: 8.3 |
postponed | [WTS] [JSN] | |||
R3-174067 | Signaling GNSS Positioning Enhancements |
CR revised to R3-174821 |
Ericsson | 36.455 14.3.0 CR#82 catB | LCS_LTE_acc_enh-Core | Rel-15 |
R3-97 AI: 15.2 |
withdrawn | [WTS] [JSN] |
R3-174068 | Data forwarding aspects for intra-system ACTIVE mobility | pCR | Ericsson | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
withdrawn | [WTS] [JSN] |
R3-174069 | Data forwarding aspects for intra-system ACTIVE mobility - TP for 37340 | pCR | Ericsson | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
withdrawn | [WTS] [JSN] |
R3-174070 | Data forwarding aspects for intra-system ACTIVE mobility - TP for XnAP | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.5 |
withdrawn | [WTS] [JSN] |
R3-174071 | Bearer harmonisation - TP for Xn | pCR | Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.4 |
withdrawn | [WTS] [JSN] |
R3-174072 | On the benefits of F1AP transaction ID | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.1 |
noted | [WTS] [JSN] | |
R3-174073 | On system information | pCR | Ericsson | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
not pursued | [WTS] [JSN] |
R3-174074 | On configuration update | pCR | Ericsson | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.5 |
not pursued | [WTS] [JSN] |
R3-174075 | Variable length gNB IDs encoding | other | Mitsubishi Electric RCE | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.5.3 |
noted | [WTS] [JSN] | |
R3-174076 | Considerations on Solution 9 (Option 2) for CN overload control for CP data | discussion | LG Electronics | Rel-14 |
R3-97 AI: 9.2 |
noted | [WTS] [JSN] | ||
R3-174077 | [Draft] Reply LS on Solution 9 (Option 2) for CN overload control for CP data |
LS out LS To: CT1, RAN2 |
LG Electronics |
R3-97 AI: 9.2 |
withdrawn | [WTS] [JSN] | |||
R3-174078 | Update of QoS Flow Level Parameters | discussion | Huawei |
R3-97 AI: 10.1.1 |
noted | [WTS] [JSN] | |||
R3-174079 | TP for 38.300 on Slice unavailable | pCR | CATT | 38.3 1.0.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.2 |
withdrawn | [WTS] [JSN] |
R3-174080 | TP for 38.413 on Slice unavailable | pCR | CATT | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.2.2 |
withdrawn | [WTS] [JSN] |
R3-174081 | Data forwarding in NR | discussion | Huawei |
R3-97 AI: 10.5.5 |
noted | [WTS] [JSN] | |||
R3-174082 | QoS Flow Level Offloading in DC | discussion | Huawei |
R3-97 AI: 10.1.5 |
noted | [WTS] [JSN] | |||
R3-174083 | Discussion on inter-node RRC container | discussion | CATT |
R3-97 AI: 10.10.1. |
noted | [WTS] [JSN] | |||
R3-174084 | [Draft]LS to RAN2 on the definition of inter-node RRC container |
LS out LS To: RAN2 |
CATT |
R3-97 AI: 10.10.1. |
withdrawn | [WTS] [JSN] | |||
R3-174085 | Issue on Inter-gNB-DU Mobility using SCG SRB (EN-DC) | discussion | LG Electronics UK |
R3-97 AI: 10.10.1.6 |
not pursued | [WTS] [JSN] | |||
R3-174086 | Principle of Context Retrieval in RRC_INACTIVE | discussion | Qualcomm Japan Inc | Rel-15 |
R3-97 AI: 10.6.4 |
noted | [WTS] [JSN] | ||
R3-174087 | Text proposal for clarifications on NR slicing | pCR | Samsung | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.2.1 |
withdrawn | [WTS] [JSN] |
R3-174088 | Mechanism for simultaneously releasing multiple UE contexts | discussion | NTT DOCOMO INC. |
R3-97 AI: 10.8.1.3 |
noted | [WTS] [JSN] | |||
R3-174089 | eCPRI and the Study on CU-DU lower layer split for NR | discussion | NTT DOCOMO INC. |
R3-97 AI: 11.3 |
not pursued | [WTS] [JSN] | |||
R3-174090 | Evaluation on the complexity of the different split options | discussion | NTT DOCOMO INC. |
R3-97 AI: 11.2 |
withdrawn | [WTS] [JSN] | |||
R3-174091 | Response to R3-173487 | pCR | Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.12.3.1 |
withdrawn | [WTS] [JSN] |
R3-174092 | Response to R3-173902 | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core |
R3-97 AI: 10.5.6 |
withdrawn | [WTS] [JSN] | ||
R3-174093 | Response to R3-173944 | pCR | Nokia, Nokia Shanghai Bell | 38.3 1.0.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.3 |
withdrawn | [WTS] [JSN] |
R3-174094 | Response to R3-173945 | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core |
R3-97 AI: 10.6.4 |
not pursued | [WTS] [JSN] | ||
R3-174095 | Response to R3-173956 | response | NTT DOCOMO INC. | NR_newRAT-Core |
R3-97 AI: 10.8.3.1 |
not pursued | [WTS] [JSN] | ||
R3-174096 | Rensponse to R3-173980 | response | NTT DOCOMO INC. | FS_NR_CU_DU_LLS |
R3-97 AI: 11.1 |
noted | [WTS] [JSN] | ||
R3-174097 | Correction on TS 38.423 |
pCR revision of R3-173977 |
Ericsson | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.3.2 |
agreed | [WTS] [JSN] |
R3-174098 | Proposed plan for adding ASN.1 to 38.473 |
pCR revision of R3-173897 |
Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.3.3 |
agreed | [WTS] [JSN] |
R3-174099 | Some Considerations on the Backhaul Signalling for LTE-NR Coexistence |
discussion revision of R3-173758 |
China Telecommunications |
R3-97 AI: 10.14 |
not pursued | [WTS] [JSN] | |||
R3-174100 | Updated DraftTS 38.414 NG-RAN NG Data Transport |
discussion revision of R3-173492 |
ZTE Corporation | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.4 |
agreed | [WTS] [JSN] | |
R3-174101 | Clean-up of 37.340 RAN3 Related Part |
pCR revision of R3-173491 |
ZTE Corporation | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.2 |
agreed | [WTS] [JSN] |
R3-174102 | LS on UE/RAN Radio information and Compatibility Request Response |
LS in source LS: S2-176691 |
TSG WG SA2 | 5GS_Ph1 |
R3-97 AI: 10.5.6 |
noted | [WTS] [JSN] | ||
R3-174103 | Solving some FFS in 38.401v030 |
pCR revision of R3-173812 |
NEC | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.11.3 |
agreed | [WTS] [JSN] |
R3-174104 | Text Proposal for Rapporteur’s update for TS 38.410 |
pCR revision of R3-173783 |
Nokia, Nokia Shanghai Bell | 38.41 0.4.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.11.4 |
agreed | [WTS] [JSN] |
R3-174105 | TP for QoS Flow Level Parameters in TS 38.413 |
pCR revision of R3-173813 |
NEC | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.1.1 |
agreed | [WTS] [JSN] |
R3-174106 | Data volume reporting of Secondary RAT usage |
other revision of R3-173950 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
endorsed | [WTS] [JSN] | |
R3-174107 | S1AP TP Data volume reporting of Secondary RAT usage |
other revision of R3-173951 revised to R3-174224 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
revised | [WTS] [JSN] | |
R3-174108 | QoE Session Report | report | RAN3 Vice Chair |
R3-97 AI: 17 |
endorsed | [WTS] [JSN] | |||
R3-174109 | feNB-IoT Enmhancements Session Report | report | RAN3 Vice Chair |
R3-97 AI: 13 |
noted | [WTS] [JSN] | |||
R3-174110 | Text Proposal for QoS Handling in Dual Connectivity 5GC |
pCR revision of R3-173766 revised to R3-174214 |
Nokia, Nokia Shanghai Bell | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.1.5 |
revised | [WTS] [JSN] |
R3-174111 | Stage 2 TP for X2 setup and configuration update between an eNB and a gNB |
other revision of R3-173750 revised to R3-174195 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core |
R3-97 AI: 10.3.3 |
revised | [WTS] [JSN] | ||
R3-174112 | Stage 3 CR of X2 setup and node configuration update for option 3 |
draftCR revision of R3-173702 revised to R3-174197 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
revised | [WTS] [JSN] | |
R3-174113 | Reply LS on supporting of reliable DL NAS delivery |
LS out LS is reply to S2-176333 LS To: TSG WG SA2 revision of R3-173512 |
Huawei (TSG WG RAN3) | NB_IOTenh-Core | Rel-14 |
R3-97 AI: 8.1 |
approved | [WTS] [JSN] | |
R3-174114 | Way forward on Paging failures for CE Capable Ues | other | Huawei |
R3-97 AI: 9.2 |
agreed | [WTS] [JSN] | |||
R3-174115 | Paging failures for CE Capable UEs from legacy LTE cell | CR | Huawei | 36.413 14.4.0 CR#15371 catF | TEI14 | Rel-14 |
R3-97 AI: 8.1 |
withdrawn | [WTS] [JSN] |
R3-174116 | Inter Master Node handover with Secondary Node change |
pCR revision of R3-173694 |
NTT DOCOMO INC. | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8 |
withdrawn | [WTS] [JSN] |
R3-174117 | Introduction of new IEs in X2 for high performing load balance |
CR revision of R3-173905 revised to R3-174198 |
CMCC | 36.423 14.4.0 CR#10441 catA | TEI14 | Rel-14 |
R3-97 AI: 9.2 |
revised | [WTS] [JSN] |
R3-174118 | St2 TP towards TS 38.401 | pCR | Ericsson | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.1 |
agreed | [WTS] [JSN] |
R3-174119 | Introduction of gNB-DU ID to TS 38.401 | pCR | Nokia | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.2 |
agreed | [WTS] [JSN] |
R3-174120 | Introduction of gNB-DU ID to TS 38.473 | pCR | Nokia | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.2 |
agreed | [WTS] [JSN] |
R3-174121 | LS on AMF planned removal procedure |
LS out LS To: TSG WG RAN2 |
TSG WG RAN3 (Nokia) | NR_newRAT-Core |
R3-97 AI: 10.12.3 |
withdrawn | [WTS] [JSN] | ||
R3-174122 | Discussion on system information transfer |
pCR revision of R3-173596 |
CATT | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
agreed | [WTS] [JSN] |
R3-174123 | UE initial access flow | discussion | NTT DOCOMO |
R3-97 AI: 10.11.3 |
noted | [WTS] [JSN] | |||
R3-174124 | pCR on mobility aspects to 38.401 | pCR | Huawei | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.6 |
agreed | [WTS] [JSN] |
R3-174125 | Documentation of option 3 in in 38.401 |
pCR revision of R3-173551 |
Interdigital Asia LLC | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] |
R3-174126 | Documentation of option 3 in in 38.470 |
pCR revision of R3-173545 |
Interdigital Asia LLC | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] |
R3-174127 | Documentation of option 3 in in 38.471 |
pCR revision of R3-173546 |
Interdigital Asia LLC | 38.471 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] |
R3-174128 | Documentation of option 3 in in 38.472 |
pCR revision of R3-173547 |
Interdigital Asia LLC | 38.472 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] |
R3-174129 | Documentation of option 3 in in 38.473 |
pCR revision of R3-173548 |
Interdigital Asia LLC | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] |
R3-174130 | Documentation of option 3 in in 38.474 |
pCR revision of R3-173549 |
Interdigital Asia LLC | 38.474 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] |
R3-174131 | Documentation of option 3 in in 38.475 |
pCR revision of R3-173550 |
Interdigital Asia LLC | 38.475 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] |
R3-174132 | Completion of the RRC tunnelling in MR-DC |
pCR revision of R3-173494 |
Nokia, Nokia Shanghai Bell, ZTE | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] |
R3-174133 | Completion of the RRC tunnelling in MR-DC |
other revision of R3-173495 revised to R3-174204 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] | |
R3-174134 | Completion of the RRC tunnelling in MR-DC |
pCR revision of R3-173496 revised to R3-174205 |
Nokia, Nokia Shanghai Bell | 38.423 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.1 |
revised | [WTS] [JSN] |
R3-174135 | TR 38.816 Study on CU-DU lower layer split for NR | draft TR | NTT DOCOMO | FS_NR_CU_DU_LLS | Rel-15 |
R3-97 AI: 11 |
endorsed | [WTS] [JSN] | |
R3-174136 | Discussion on SCG Change |
pCR revision of R3-173602 |
CATT | 37.34 1.0.1 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] |
R3-174137 | TP for 36.423 on SCG Change |
draftCR revision of R3-173603 |
CATT | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] | |
R3-174138 | TP 36.300 for counter check |
draftCR revision of R3-173530 revised to R3-174206 |
ZTE | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
revised | [WTS] [JSN] | |
R3-174139 | Way forward for enabling delta signalling | other | Nokia, Nokia Shanghai Bell |
R3-97 AI: 10.8.1.2 |
noted | [WTS] [JSN] | |||
R3-174140 | Way forward on the issue for EN-DC SRB | other | CATT |
R3-97 AI: 10.8.1.5 |
noted | [WTS] [JSN] | |||
R3-174141 | Way Forward on bearer type change | other | LG Electronics Inc. |
R3-97 AI: 10.8.1.6 |
noted | [WTS] [JSN] | |||
R3-174142 | Way Forward on UE_AMBR | other | Huawei |
R3-97 AI: 10.8.1.9 |
withdrawn | [WTS] [JSN] | |||
R3-174143 | Introduction to Rapporteur Update TR 38.806 |
pCR revision of R3-173991 |
Ericsson | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
agreed | [WTS] [JSN] |
R3-174144 | LS on system information broadcast in CU/DU Split Scenario |
LS out LS To: TSG WG RAN2 revised to R3-174199 |
TSG WG RAN3 (CATT) |
R3-97 AI: 10.10.1.4 |
revised | [WTS] [JSN] | |||
R3-174145 | Scenarios, benefits and solution |
pCR revision of R3-173569 |
Nokia, Nokia Shanghai Bell | 38.806 0.1.0 | FS_NR_CPUP_Split | Rel-15 |
R3-97 AI: 22.1 |
agreed | [WTS] [JSN] |
R3-174146 | TP of System Information (TS 38.470) | pCR | Huawei | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
agreed | [WTS] [JSN] |
R3-174147 | TP of System Information (TS 38.473) |
pCR revised to R3-174202 |
Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
revised | [WTS] [JSN] |
R3-174148 | Way forward on assitance data signalling | other | Nokia |
R3-97 AI: 15.1 |
noted | [WTS] [JSN] | |||
R3-174149 | Cell activation procedure |
pCR revision of R3-173552 |
Nokia, Nokia Shanghai Bell, AT&T, KDDI, KT, Vodafone, Fujitsu | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.8 |
not pursued | [WTS] [JSN] |
R3-174150 | Way forward on LTE-NR coexistance aspects | other | Nokia |
R3-97 AI: 10.14 |
noted | [WTS] [JSN] | |||
R3-174151 | TP for Planned AMF removal | pCR | Nokia | 38.41 0.4.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.12.3.1 |
agreed | [WTS] [JSN] |
R3-174152 | Paging management |
pCR revision of R3-173563 |
Nokia, Nokia Shanghai Bell | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.7 |
agreed | [WTS] [JSN] |
R3-174153 | F1 Setup and Cell Activation | pCR | Huawei | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.8 |
agreed | [WTS] [JSN] |
R3-174154 | F1 Setup and Cell Activation | pCR | Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.8 |
agreed | [WTS] [JSN] |
R3-174155 | Details on fast retransmission of lost PDUs |
pCR revised to R3-174217 |
Ericsson, AT&T | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.9 |
revised | [WTS] [JSN] |
R3-174156 | TP for Radio Link Outage and Retransmission notification |
pCR revised to R3-174218 |
Ericsson, AT&T, Nokia | 38.475 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
revised | [WTS] [JSN] |
R3-174157 | draft LS on centralized retransmission solution |
LS out LS To: TSG WG RAN2 revised to R3-174219 |
TSG WG RAN3 |
R3-97 AI: 10.10.1.9 |
revised | [WTS] [JSN] | |||
R3-174158 | LS on UE/RAN Radio information and Compatibility Request Response |
LS out LS To: TSG WG SA2, TSG WG SA3, TSG WG RAN2 revised to R3-174223 |
TSG WG RAN3 (Nokia) |
R3-97 AI: 10.12.3.1 |
revised | [WTS] [JSN] | |||
R3-174159 | Way forward on UE radio capability | discussion | Nokia |
R3-97 AI: 10.12.3.1 |
noted | [WTS] [JSN] | |||
R3-174160 | MN and SN role for QoS flow to DRB mapping |
pCR revision of R3-173952 |
Ericsson | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.3 |
agreed | [WTS] [JSN] |
R3-174161 | Scope of Low Layer Split Architectures |
pCR revised to R3-174220 |
Ericsson | 38.816 0.0.1 | FS_NR_CU_DU_LLS | Rel-15 |
R3-97 AI: 11.1 |
revised | [WTS] [JSN] |
R3-174162 | Use of DNS for AMF discovery |
pCR revision of R3-173541 |
Nokia, Nokia Shanghai Bell, Verizon Wireless | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
agreed | [WTS] [JSN] |
R3-174163 | Introduction of NB-IoT early data transmission |
CR revision of R3-173519 revised to R3-174346 |
Huawei | 36.413 14.4.0 CR#15361 catB | NB_IOTenh2-Core | Rel-15 |
R3-97 AI: 13.1 |
endorsed | [WTS] [JSN] |
R3-174164 | Introduction of QoE Measurement Collection for LTE |
CR revision of R3-173927 revised to R3-174584 |
Huawei | 36.413 14.4.0 CR#15431 catB | LTE_QMC_Streaming | Rel-15 |
R3-97 AI: 17.1 |
endorsed | [WTS] [JSN] |
R3-174165 | Correction of eNB-CU eNB-DU scenarios |
pCR revision of R3-173521 |
Huawei, China Unicom, Orange | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12.1 |
agreed | [WTS] [JSN] |
R3-174166 | TP for updates on TR 37.876 |
pCR revision of R3-173790 |
China Unicom, Orange, Huawei, HiSilicon | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12 |
agreed | [WTS] [JSN] |
R3-174167 | ng-eNB CU DU deployment for architecture option 4 |
pCR revision of R3-173522 |
Huawei, China Unicom, Orange | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12.1 |
agreed | [WTS] [JSN] |
R3-174168 | V1AP RRC Message Transfer |
pCR revision of R3-173523 |
Huawei, China Unicom, Orange | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12.2 |
agreed | [WTS] [JSN] |
R3-174169 | User Plane aspects of V1 interface |
pCR revision of R3-173525 |
Huawei, China Unicom | 37.876 0.0.1 | FS_LTE_arch_evo | Rel-15 |
R3-97 AI: 12.2 |
agreed | [WTS] [JSN] |
R3-174170 | TP for St2 on Paging management (38.470) | pCR | Huawei | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
agreed | [WTS] [JSN] |
R3-174171 | TP for St3 on Paging management (38.473) | pCR | Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.7 |
agreed | [WTS] [JSN] |
R3-174172 | Discussion on configuration update procedures between gNB-CU and gNB-DU |
discussion revision of R3-173725 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
withdrawn | [WTS] [JSN] | |
R3-174173 | pCR on gNB CU&DU update procedure to 38.473 | pCR | Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
agreed | [WTS] [JSN] |
R3-174174 | pCR on gNB CU&DU update procedure to 38.470 | pCR | Huawei | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
agreed | [WTS] [JSN] |
R3-174175 | PoC of single 5G UP specification for 5G flow control | pCR | Ericsson | 38.425 0.1.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.12.5.1 |
not pursued | [WTS] [JSN] |
R3-174176 | Text Proposal for data forwarding at Intersystem Handover |
pCR revision of R3-173781 revised to R3-174212 |
Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
revised | [WTS] [JSN] |
R3-174177 | Data forwarding for Inter-system handover from 5GS to EPS |
pCR revision of R3-173834 |
Samsung | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
agreed | [WTS] [JSN] |
R3-174178 | TP for supporting N2 requirements from SA2 (TS38.413) |
pCR revision of R3-173537 |
Nokia, Nokia Shanghai Bell | 38.413 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.5.1 |
agreed | [WTS] [JSN] |
R3-174179 | [DRAFT] LS on multiple SCTP associations |
LS out LS To: TSG WG SA2 revision of R3-173795 revised to R3-174228 |
Intel Corporation | Rel-15 |
R3-97 AI: 10.5.1 |
revised | [WTS] [JSN] | ||
R3-174180 | Draft LS on length of NR Cell Identity |
LS out LS To: TSG WG RAN2 revision of R3-173643 revised to R3-174229 |
Nokia, Nokia Shanghai Bell |
R3-97 AI: 10.5.3 |
revised | [WTS] [JSN] | |||
R3-174181 | TP for Supporting MN Initiate SN Change |
pCR revision of R3-173824 revised to R3-174221 |
Samsung, HTC, Huawei | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
revised | [WTS] [JSN] |
R3-174182 | TP for Supporting MN Initiate SN Change |
draftCR revision of R3-173825 |
Samsung, HTC, Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
agreed | [WTS] [JSN] | |
R3-174183 | TP for Supporting MN Initiate SN Change | pCR | Samsung, HTC, Huawei | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
agreed | [WTS] [JSN] |
R3-174184 | Reply LS on definition of RAN Notification Area in inactive state |
LS in source LS: R2-1712006 |
TSG WG RAN2 | R3-97 | noted | [WTS] [JSN] | |||
R3-174185 | Stage2 TP on RRC Inactive Assistant Information |
pCR revision of R3-173839 revised to R3-174230 |
Samsung | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.2 |
revised | [WTS] [JSN] |
R3-174186 | Stage3 TP on RRC Inactive Assistant Information |
pCR revision of R3-173840 |
Samsung | 38.413 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.2 |
agreed | [WTS] [JSN] |
R3-174187 | RAN paging failure handling in RRC_INACTIVE |
pCR revision of R3-173814 |
NEC | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.3 |
agreed | [WTS] [JSN] |
R3-174188 | Text Proposal for Unreachability in RRC Inactive State |
pCR revision of R3-173777 |
Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6 |
agreed | [WTS] [JSN] |
R3-174189 | pCR on mobility aspects to 38.470 | pCR | Hauwei | 38.47 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.6 |
agreed | [WTS] [JSN] |
R3-174190 | pCR on mobility aspects to 38.473 | pCR | Hauwei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.6 |
agreed | [WTS] [JSN] |
R3-174192 | TP for QoS Flow Level Parameters in TS 38.423 | pCR | NEC | 38.423 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.1.1 |
agreed | [WTS] [JSN] |
R3-174193 | LS on defining GTP extension header for 5G |
LS out LS To: TSG WG CT4 revision of R3-173765 revised to R3-174196 |
Nokia, Nokia Shanghai Bell | Rel-15 |
R3-97 AI: 10.1.4 |
revised | [WTS] [JSN] | ||
R3-174194 | UE-AMBR enforcement for Option 3 family |
pCR revision of R3-173916 |
Huawei | 37.34 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.8 |
agreed | [WTS] [JSN] |
R3-174195 | Stage 2 TP for X2 setup and configuration update between an eNB and a gNB |
other revision of R3-174111 revised to R3-174232 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core |
R3-97 AI: 10.3.3 |
revised | [WTS] [JSN] | ||
R3-174196 | LS on defining GTP extension header for 5G |
LS out LS To: TSG WG CT4 revision of R3-174193 |
Nokia, Nokia Shanghai Bell | Rel-15 |
R3-97 AI: 10.1.4 |
approved | [WTS] [JSN] | ||
R3-174197 | Stage 3 CR of X2 setup and node configuration update for option 3 |
draftCR revision of R3-174112 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.3.3 |
agreed | [WTS] [JSN] | |
R3-174198 | Introduction of new IEs in X2 for high performing load balance |
CR revision of R3-174117 |
CMCC | 36.423 14.4.0 CR#10442 catF | TEI14 | Rel-14 |
R3-97 AI: 9.2 |
agreed | [WTS] [JSN] |
R3-174199 | LS on system information broadcast in CU/DU Split Scenario |
LS out LS To: TSG WG RAN2 revision of R3-174144 |
TSG WG RAN3 (CATT) |
R3-97 AI: 10.10.1.4 |
approved | [WTS] [JSN] | |||
R3-174200 | [DRAFT] LS on MN-initiated SN change for delta signalling |
LS out LS is reply to R2-1707502 source LS: R2-1707502 LS To: TSG WG RAN2 revision of R3-173503 revised to R3-174233 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
revised | [WTS] [JSN] | |
R3-174201 | LS on the need for EPS Bearer ID knowledge in NG-RAN for inter-system handover from 5GC to EPC |
LS out LS To: TSG WG SA2 revised to R3-174226 |
TSG WG RAN3 (Samsung) |
R3-97 AI: 10.8.3.1 |
revised | [WTS] [JSN] | |||
R3-174202 | TP of System Information (TS 38.473) |
pCR revision of R3-174147 |
Huawei | 38.473 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.4 |
agreed | [WTS] [JSN] |
R3-174203 | Introduction of secondary RAT data volume reporting over X2 |
other revision of R3-173925 |
Huawei | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
noted | [WTS] [JSN] | |
R3-174204 | Completion of the RRC tunnelling in MR-DC |
other revision of R3-174133 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
endorsed | [WTS] [JSN] | |
R3-174205 | Completion of the RRC tunnelling in MR-DC |
pCR revision of R3-174134 |
Nokia, Nokia Shanghai Bell | 38.423 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.2.1 |
agreed | [WTS] [JSN] |
R3-174206 | TP 36.300 for counter check |
draftCR revision of R3-174138 |
ZTE | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.2 |
agreed | [WTS] [JSN] | |
R3-174207 | Way forward on PDCP Duplication or ST3 TP 38.425 | other | Intel |
R3-97 AI: 10.8.3.3 |
withdrawn | [WTS] [JSN] | |||
R3-174208 | LS on inter-MN handover with SN change |
LS in source LS: R2-1712025 |
TSG WG RAN2 | R3-97 | noted | [WTS] [JSN] | |||
R3-174209 | LS on UE RF related parameters, capabilities and features for NR |
LS in source LS: R2-1712028 |
TSG WG RAN2 | R3-97 | noted | [WTS] [JSN] | |||
R3-174210 | Secondary RAT data volume reporting |
pCR revision of R3-173923 revised to R3-174234 |
Huawei | 37.34 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
revised | [WTS] [JSN] |
R3-174211 | Reply LS on FS_REAR study outcome |
LS in source LS: R2-1711861 |
TSG WG RAN2 | R3-97 | noted | [WTS] [JSN] | |||
R3-174212 | Text Proposal for data forwarding at Intersystem Handover |
pCR revision of R3-174176 revised to R3-174225 |
Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
revised | [WTS] [JSN] |
R3-174213 | Implementation of the UP enhancements |
other revised to R3-174222 |
Nokia, Nokia Shanghai Bell, Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
revised | [WTS] [JSN] | |
R3-174214 | Text Proposal for QoS Handling in Dual Connectivity 5GC |
pCR revision of R3-174110 |
Nokia, Nokia Shanghai Bell | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.1.5 |
agreed | [WTS] [JSN] |
R3-174215 | LS on RAN2 progress of QoE Measurement Collection in LTE |
LS in source LS: R2-1712035 |
TSG WG RAN2 | R3-97 | noted | [WTS] [JSN] | |||
R3-174216 | Way forward on flow control support for PDCP duplicatiop | other | Intel |
R3-97 AI: 10.8.3.3 |
noted | [WTS] [JSN] | |||
R3-174217 | Details on fast retransmission of lost PDUs |
pCR revision of R3-174155 |
Ericsson, AT&T | 38.401 0.3.0 | NR_newRAT | Rel-15 |
R3-97 AI: 10.10.1.9 |
agreed | [WTS] [JSN] |
R3-174218 | TP for Radio Link Outage and Retransmission notification |
pCR revision of R3-174156 |
Ericsson, AT&T, Nokia | 38.475 0.2.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.1.9 |
agreed | [WTS] [JSN] |
R3-174219 | draft LS on centralized retransmission solution |
LS out LS To: TSG WG RAN2 revision of R3-174157 |
TSG WG RAN3 |
R3-97 AI: 10.10.1.9 |
approved | [WTS] [JSN] | |||
R3-174220 | Scope of Low Layer Split Architectures |
pCR revision of R3-174161 |
Ericsson | 38.816 0.0.1 | FS_NR_CU_DU_LLS | Rel-15 |
R3-97 AI: 11.1 |
agreed | [WTS] [JSN] |
R3-174221 | TP for Supporting MN Initiate SN Change |
pCR revision of R3-174181 |
Samsung, HTC, Huawei | 37.34 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
agreed | [WTS] [JSN] |
R3-174222 | Implementation of the UP enhancements |
other revision of R3-174213 |
Nokia, Nokia Shanghai Bell, Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.3.1 |
endorsed | [WTS] [JSN] | |
R3-174223 | LS on UE/RAN Radio information and Compatibility Request Response |
LS out LS To: TSG WG SA2, TSG WG SA3, TSG WG RAN2 revision of R3-174158 revised to R3-174231 |
TSG WG RAN3 (Nokia) |
R3-97 AI: 10.12.3.1 |
revised | [WTS] [JSN] | |||
R3-174224 | S1AP TP Data volume reporting of Secondary RAT usage |
other revision of R3-174107 revised to R3-174235 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
revised | [WTS] [JSN] | |
R3-174225 | Text Proposal for data forwarding at Intersystem Handover |
pCR revision of R3-174212 |
Nokia, Nokia Shanghai Bell | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.7.3 |
agreed | [WTS] [JSN] |
R3-174226 | LS on the need for EPS Bearer ID knowledge in NG-RAN for inter-system handover from 5GC to EPC |
LS out LS To: TSG WG SA2 revision of R3-174201 |
TSG WG RAN3 (Samsung) |
R3-97 AI: 10.8.3.1 |
approved | [WTS] [JSN] | |||
R3-174227 | Discussion on configuration update procedures between gNB-CU and gNB-DU | pCR | Huawei | 38.401 0.3.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.10.2.1 |
agreed | [WTS] [JSN] |
R3-174228 | LS on multiple SCTP associations |
LS out LS To: TSG WG SA2 revision of R3-174179 |
Intel Corporation | Rel-15 |
R3-97 AI: 10.5.1 |
approved | [WTS] [JSN] | ||
R3-174229 | Draft LS on length of NR Cell Identity |
LS out LS To: TSG WG RAN2 revision of R3-174180 |
Nokia, Nokia Shanghai Bell |
R3-97 AI: 10.5.3 |
approved | [WTS] [JSN] | |||
R3-174230 | Stage2 TP on RRC Inactive Assistant Information |
pCR revision of R3-174185 |
Samsung | 38.3 1.0.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.6.2 |
agreed | [WTS] [JSN] |
R3-174231 | LS on UE/RAN Radio information and Compatibility Request Response |
LS out LS To: TSG WG SA2 revision of R3-174223 |
TSG WG RAN3 (Nokia) |
R3-97 AI: 10.12.3.1 |
approved | [WTS] [JSN] | |||
R3-174232 | Stage 2 TP for X2 setup and configuration update between an eNB and a gNB |
other revision of R3-174195 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core |
R3-97 AI: 10.3.3 |
endorsed | [WTS] [JSN] | ||
R3-174233 | LS on MN-initiated SN change for delta signalling |
LS out LS is reply to R2-1707502 source LS: R2-1707502 LS To: TSG WG RAN2 revision of R3-174200 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.3 |
approved | [WTS] [JSN] | |
R3-174234 | Secondary RAT data volume reporting |
pCR revision of R3-174210 |
Huawei | 37.34 0.4.0 | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
agreed | [WTS] [JSN] |
R3-174235 | S1AP TP Data volume reporting of Secondary RAT usage |
other revision of R3-174224 |
Ericsson | NR_newRAT-Core | Rel-15 |
R3-97 AI: 10.8.1.9 |
endorsed | [WTS] [JSN] | |
R3-174236 | draft RAN3#97bis meeting report | report | ETSI MCC |
R3-97 AI: 33 |
noted | [WTS] [JSN] | |||
R3-174237 | TS 38.401 v0.4.0 covering agreements of RAN3 #97bis | draft TS | NEC | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174238 | TS 38.410 v0.5.0 covering agreements of RAN3 #97bis | draft TS | Nokia | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174239 | TS 38.413 v0.4.0 covering agreements of RAN3 #97bis | draft TS | Nokia | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174240 | TS 38.414 v0.3.0 covering agreements of RAN3 #97bis | draft TS | ZTE | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174241 | TS 38.420 v0.4.0 covering agreements of RAN3 #97bis | draft TS | Qualcomm | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174242 | TS 38.423 v0.4.0 covering agreements of RAN3 #97bis | draft TS | Ericsson | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174243 | TS 38.425 v0.2.0 covering agreements of RAN3 #97bis | draft TS | Ericsson | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174244 | TS 38.470 v0.4.0 covering agreements of RAN3 #97bis | draft TS | Huawei | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174245 | TS 38.471 v0.3.0 covering agreements of RAN3 #97bis | draft TS | Fujitsu | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174246 | TS 38.472 v0.4.0 covering agreements of RAN3 #97bis | draft TS | Interdigital | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174247 | TS 38.473 v0.4.0 covering agreements of RAN3 #97bis | draft TS | Huawei | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174248 | TS 38.474 v0.3.0 covering agreements of RAN3 #97bis | draft TS | Intel | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174249 | TS 38.475 v0.3.0 covering agreements of RAN3 #97bis | draft TS | Samsung | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174250 | TS 38.455 v0.2.0 covering agreements of RAN3 #97bis | draft TS | Ericsson | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174251 | Baseline CR to TS 36.413 covering agreements of RAN3 #97bis |
CR revision of R3-173809 revised to R3-174440 |
Nokia, Nokia Shanghai Bell | 36.413 14.4.0 CR#15244 catB | NR_newRAT-Core | Rel-15 | R3-97 | endorsed | [WTS] [JSN] |
R3-174252 | Baseline CR to TS 36.423 covering agreements of RAN3 #97bis |
CR revision of R3-174065 revised to R3-174381 |
Huawei, Ericsson, LG Electronics Inc., CATT, ZTE, Nokia, Nokia Shanghai Bell, Intel Corporation | 36.423 14.4.0 CR#10413 catB | NR_newRAT-Core | Rel-15 | R3-97 | endorsed | [WTS] [JSN] |
R3-174253 | Baseline CR to RAN2 TS 36.300 covering agreements of RAN3 #97bis |
draftCR revision of R3-173493 revised to R3-174311 |
Nokia, Nokia Shanghai Bell, ZTE | NR_newRAT-Core | Rel-15 | R3-97 | endorsed | [WTS] [JSN] | |
R3-174254 | Baseline pCR to RAN2 TS 37.340 covering agreements of RAN3 #97bis |
draftCR revision of R3-173490 |
ZTE | NR_newRAT-Core | Rel-15 | R3-97 | endorsed | [WTS] [JSN] | |
R3-174255 | TR 37.876 v0.1.0 covering agreements of RAN3 #97bis | draft TR | China Unicom | FS_LTE_arch_evo | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174256 | TR 38.806 v0.2.0 covering agreements of RAN3 #97bis | draft TR | Ericsson | FS_NR_CPUP_Split | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174257 | TR 38.816 v0.1.0 covering agreements of RAN3 #97bis | draft TR | NTT DOCOMO | FS_NR_CU_DU_LLS | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174258 | TS 38.401 v0.4.1 removing chapters related with F1 function (Transfer to 38.470) | draft TS | NEC | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] | |
R3-174259 | TS 38.470 v0.4.1 adding chapters related with F1 function (transfer from 38.401) | draft TS | Huawei | NR_newRAT-Core | Rel-15 | R3-97 | agreed | [WTS] [JSN] |
794 documents (1.1183149814606 seconds)