Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-180006 | Discussion about Test parameters for NR TRx TCs |
discussion revised to R5-180065 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | |
R5-180007 | Discussion about mmW Test Tolerance for NR TRx TCs |
discussion revised to R5-180083 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | |
R5-180008 | Test methodology for mmWave Demod testing |
discussion revised to R5-180080 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180009 | Link budget consideration for mmWave Demod Tests |
discussion revised to R5-180081 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180010 | Radiated Emissions Measurement Challenges below 30 MHz | discussion | Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
withdrawn | [WTS] [JSN] | ||
R5-180011 | TRP/EIRP Measurement Procedure Alignment with ANSI C63 and ETSI EN 301 908-1 |
discussion revised to R5-180098 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180012 | Discussion on mmWave UE conformance RF testing |
discussion revised to R5-180090 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180013 | Signalling NR Testcases - OTA chamber requirements | discussion | Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180014 | Discussion on test point selection of MOP, MPR and AMPR in FR1 |
discussion revised to R5-180067 |
Huawei, CATR | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180022 | Discussion on test case responsibility split | discussion | Ericsson | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180023 | Discussion of test channel BW and sub-carrier spacing (SCS) approach for NR TRx test cases |
discussion revised to R5-180111 |
Ericsson | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180025 | WP 38.522 RF RRM Applicability | Work Plan | China Mobile Com. Corporation | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | |
R5-180026 | Draft TS 38.522 v0.1.0 skeleton |
draft TS revised to R5-180107 |
China Mobile Com. Corporation | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | |
R5-180027 | Discussion on uncertainty of Sub-6GHz NR TRx tests |
discussion revised to R5-180084 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180028 | Consideration on the FR2 TRx test procedure |
discussion revised to R5-180091 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180029 | Discussion on FR2 Spurious Test |
discussion revised to R5-180101 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180030 | LTE Anchor Link Requirements |
discussion revised to R5-180088 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180031 | Discussion on FR2 uncertainty |
discussion revised to R5-180082 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180032 | Discussion paper on 5G NR Connection Diagrams for conducted tests | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180033 | Discussion on the need for additional UE locking functions in TS 38.509 | discussion | Fraunhofer HHI, Fraunhofer IIS |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | |||
R5-180040 | On extensions to the UE beam locking conformance testing function | discussion | Fraunhofer HHI, Fraunhofer IIS |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | |||
R5-180041 | On a measurement control channel and an associated message space | discussion | Fraunhofer HHI, Fraunhofer IIS |
R5-ah-33216 AI: 4.1.7 |
withdrawn | [WTS] [JSN] | |||
R5-180042 | Discussion on synergies between test cases in TS 38.521-1. TS 38.521-2 and TS 38.521-3 |
discussion revised to R5-180106 |
Ericsson | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180047 | Discussion on Measurement Uncertainty for 5G NR |
discussion revised to R5-180085 |
PCTEST Engineering Lab | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180048 | Discussion on measurement uncertainty for 5G NR FR1 | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
withdrawn | [WTS] [JSN] | ||
R5-180049 | Discussion on connection diagrams for 5G NR | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180050 | Discussion on LTE anchor requirements for NSA |
discussion revised to R5-180089 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180054 | On Measurement Grids for mm-wave NR |
discussion revised to R5-180093 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180055 | Tx radiated spurious emissions measurements with dynamic measurement bandwidth |
discussion revised to R5-180102 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
revised | [WTS] [JSN] | ||
R5-180056 | Discussion on Measurement Uncertainty for FR2 | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180060 | On Requirements for the LTE OTA Anchor for NSA | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
withdrawn | [WTS] [JSN] | ||
R5-180064 | Skeleton for NR Demod spec 38.521-4 | draft TS | Qualcomm Inc. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
approved | [WTS] [JSN] | |
R5-180065 | Discussion about Test parameters for NR TRx TCs |
discussion revision of R5-180006 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | |
R5-180067 | Discussion on test point selection of MOP, MPR and AMPR in FR1 |
discussion revision of R5-180014 |
Huawei, CATR | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180080 | Test methodology for mmWave Demod testing |
discussion revision of R5-180008 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180081 | Link budget consideration for mmWave Demod Tests |
discussion revision of R5-180009 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180082 | Discussion on FR2 uncertainty |
discussion revision of R5-180031 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180083 | Discussion about mmW Test Tolerance for NR TRx TCs |
discussion revision of R5-180007 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | |
R5-180084 | Discussion on uncertainty of Sub-6GHz NR TRx tests |
discussion revision of R5-180027 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180085 | Discussion on Measurement Uncertainty for 5G NR |
discussion revision of R5-180047 |
PCTEST Engineering Lab | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180088 | LTE Anchor Link Requirements |
discussion revision of R5-180030 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180089 | Discussion on LTE anchor requirements for NSA |
discussion revision of R5-180050 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180090 | Discussion on mmWave UE conformance RF testing |
discussion revision of R5-180012 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180091 | Consideration on the FR2 TRx test procedure |
discussion revision of R5-180028 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180093 | On Measurement Grids for mm-wave NR |
discussion revision of R5-180054 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180098 | TRP/EIRP Measurement Procedure Alignment with ANSI C63 and ETSI EN 301 908-1 |
discussion revision of R5-180011 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
withdrawn | [WTS] [JSN] | ||
R5-180099 | TRP and EIRP Spurious Emission Measurement Procedure Baselines | discussion | Qualcomm Korea | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180101 | Discussion on FR2 Spurious Test |
discussion revision of R5-180029 |
Anritsu | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180102 | Tx radiated spurious emissions measurements with dynamic measurement bandwidth |
discussion revision of R5-180055 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180105 | Way Forward on NR connection diagrams | discussion | Rohde&Schwarz, Keysight Technologies |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | |||
R5-180106 | Discussion on synergies between test cases in TS 38.521-1. TS 38.521-2 and TS 38.521-3 |
discussion revision of R5-180042 |
Ericsson | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180107 | Draft TS 38.522 v0.1.0 skeleton |
draft TS revision of R5-180026 |
China Mobile Com. Corporation | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
approved | [WTS] [JSN] | |
R5-180111 | Discussion of test channel BW and sub-carrier spacing (SCS) approach for NR TRx test cases |
discussion revision of R5-180023 |
Ericsson | 5GS_NR_LTE-UEConTest |
R5-ah-33216 AI: 4.1.7 |
noted | [WTS] [JSN] | ||
R5-180114 | Draft TS 38.508-1 v0.2.0 | draft TS | Ericsson | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
approved | [WTS] [JSN] | |
R5-180115 | Draft TS 38.521-1 v0.1.0 | draft TS | China Unicom | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33216 AI: 4.1.7 |
approved | [WTS] [JSN] |
55 documents (0.33090400695801 seconds)