[{"name":"R5-180040","title":"On extensions to the UE beam locking conformance testing function","source":"Fraunhofer HHI, Fraunhofer IIS","contact":"Ramez Askar","contact-id":72551,"tdoctype":"discussion","for":"Endorsement","abstract":"Responding to the LS R5-180001, this contribution discusses beam locking in general and proposes the following: a multi-beam extension of the UBF; a null-locking extension of the UBF; a beam addressing scheme (BAS); and an associated message space (AMS).","secretary_remarks":"","agenda_item_sort_order":15,"ainumber":"4.1.7","ainame":"General Papers \/ Work Plan \/ TC lists","tdoc_agenda_sort_order":400,"status":"noted","reservation_date":"2018-01-08 11:36:59","uploaded":"2018-01-08 22:02:38","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"http:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG5_Test_ex-T1\/TSGR5_AHs\/2018-01-16_5G-NR_Adhoc_1\/Docs\/R5-180040.zip","group":"R5","meeting":"R5-ah-33216","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]