Sensing — the network as a radar · In depth
Every question of this course
All 74 questions on one page, in the order the chapters come. Pick an answer and it tells you at once whether you were right and where the answer lives.
1 What it means for a network to sense
Q1.1 What can a sensing network do that the network's existing positioning cannot?
The radio study says positioning based on the radio technology is already supported, and that what the specifications lack is a built-in way to detect objects that are not connected to the network. why FS_Sensing_NR was proposed
Q1.2 What is "3GPP sensing data", in the requirements document's own words?
The definition is about what happened to the signal. Something in the world changed the radio on its way, and the data is derived from that change. "3GPP sensing data" as 22.137 defines it
Q1.3 What is a "sensing result"?
The requirements document keeps the two apart. Sensing data is the raw material, a sensing result is what a service consumer is given. "Sensing result" as 22.137 defines it
Q1.4 What does the stage 2 specification now being written actually cover?
The scope of the stage 2 specification names aerial object detection and tracking and nothing else. It does not say who does the sensing — that the base station is the sensing entity is the security study's wording, not this one's. the scope of 23.137
Q1.5 How many pieces of work does the 3GPP work plan carry for this subject?
Three entries share the acronym Sensing and three share Sensing-CT, so the entry count and the acronym count are different questions with different right answers. 18 Sensing entries in the work plan
2 What people want it for, and why that question came first
Q2.1 What does TR 22.837 say it contains?
Its scope names use cases and potential requirements for enhancing the 5G system to provide sensing services, and lists the industries it looked at. the scope of 22.837
Q2.2 Which document has received more change requests than any other in this area?
518 documents name TR 22.837 and 46 of those are change requests, more than any other document in this record has received. TR 22.837
Q2.3 Which single meeting handled more sensing documents than any other?
S1-101 handled 154 sensing documents, more than any other meeting in the local record. The requirements group did its heaviest work early. S1-101 handled 154 Sensing documents, more than any other meeting
Q2.4 Which document opened the very first study on this subject?
SP-220084 is the new study item description that opened the SA1 study at SA#95-e, and it is the oldest opening document in this record. SP-220084
Q2.5 How much of the use-case study's ambition is in the stage 2 specification being written now?
The stage 2 scope narrows to aerial object detection and tracking, while the study listed driving, V2X, drones, 3D maps, smart cities, smart homes, factories, healthcare and shipping. the scope of 23.137
3 Study first, rules after — and how to read the trail
Q3.1 What is a pCR, and why are there so many of them here?
2036 of the 3492 documents are pCRs. A study report is assembled out of proposed text, so an area still doing studies is mostly pCRs. 2036 Sensing documents of type pCR
Q3.2 How many of the area's documents are change requests to a live specification?
136 of 3492. A change request is the only way a published specification is ever altered, and there are very few of them here. 136 Sensing documents of type CR
Q3.3 What does a version number below 1.0.0 tell you?
TR 33.777 stands at 0.6.0, which means the security study is still being written. Approved reports in this area sit at 19.4.0, 20.0.0 or 20.1.0. TR 33.777
Q3.4 When a study item needs changing, what happens to it?
The second radio study was revised at RAN#109 and again at RAN#110, and RP-253246 is the revision the work plan now points at. RP-253246
Q3.5 What is a liaison statement in this record?
38 documents are outgoing liaisons. SA2 sent one on what needed coordinating with RAN, and RAN3 replied with a document of its own. 38 Sensing documents of type LS out
4 The map of the groups, and where the weight sat
Q4.1 Which group filed more sensing documents than any other?
SA2 filed 995 documents over 10 meetings, the largest count of any group in this record, ahead of RAN1's 872 and SA1's 640. SA2
Q4.2 Which group spent the most meetings on sensing?
RAN1 has documents at 16 meetings, from RAN1#116 to RAN1#126 — more meetings than any other group spent on the subject. RAN1
Q4.3 How many separate meetings have had a sensing document on the table?
79 meetings across all the groups and plenaries. 3492 is the document count and 14 is the number of work item acronyms. 79 meetings have had Sensing documents on the table
Q4.4 RAN2 appears in this record with exactly one document. What is it?
RAN2's single document is at RAN2#133 and is a liaison. The group has no sensing work of its own in this record. RAN2
Q4.5 Which group is named as doing half a job but has no entry at all?
The CT work item names CT3 alongside CT4, but no document at a CT3 meeting carries a sensing acronym yet, so the register has no CT3 entry and no count for it. the objective of Sensing-CT
Q4.6 What does "OPPO filed 163 documents" tell you?
It is a count of paper filed, nothing more. Nothing in this record measures influence, and a working group's own submission is often the collected work of many companies. OPPO filed 163 Sensing documents, more than anyone else
5 RAN1 and the radio problem
Q5.1 What was the first radio study actually about?
Its stated focus is to define channel modelling aspects supporting object detection and tracking, aiming at a common modelling framework. the objective of FS_Sensing_NR
Q5.2 What is TR 38.901?
TR 38.901 is the channel model. The Rel-19 sensing study added sensing to it, and 23 of the 26 sensing documents naming it are change requests. TR 38.901
Q5.3 What does "mono-static" mean, as the second radio study writes it?
The objective spells it out in brackets — a single TRP with co-located sensing transmitter and receiver. the objective of FS_Sensing_NR_bis
Q5.4 What waveform does TR 38.765 take as its baseline?
The report's own scope says CP-OFDM is considered as baseline waveform — the same waveform the network already uses to carry data. the scope of 38.765
Q5.5 Which document approved the second radio study's report?
RP-261477 put TR 38.765 to the RAN plenary at RAN#112, and the report now stands at version 20.0.0. RP-261477
6 RAN3, and where the radio rule-writing went
Q6.1 Which group leads the radio rule-writing for sensing?
The work item that follows the studies is led by RAN3, and the three radio documents it changes are the overall description, the architecture and F1AP. NR_Sensing_bis
Q6.2 What does the radio work item promise about the phone?
The objective says so in one sentence — the work specifies gNB-based mono-static sensing for drone use cases and there will be no UE impacts. the objective of NR_Sensing_bis
Q6.3 Which specification is F1AP?
TS 38.473 is F1AP, the protocol between the two halves of a split base station. Five sensing documents name it and none of them is a change request yet. TS 38.473
Q6.4 Why does the work plan carry two entries for the same radio work item?
NR_Sensing_bis and NR_Sensing_bis-Core are both described by RP-261566, and only the core-part entry has a document against it so far. NR_Sensing_bis-Core
Q6.5 How many change requests have reached TS 38.300 and TS 38.401 for sensing?
Both are named by the RAN work item as documents it will change, and neither has a sensing change request in this record. TS 38.300
7 SA1, and writing down what the system must do
Q7.1 What does the SA1 work item say it will introduce?
The objective is to introduce KPIs and 5G system functional requirements for the wireless sensing service, covering configuration and authorization. the objective of Sensing
Q7.2 What did the requirements work item do to TS 22.261, the general 5G service requirements?
TS 22.261 carries four sensing change requests, and the work item's stated change to it is adding a new section pointing out to the new TS. TS 22.261
Q7.3 What version does TS 22.137 stand at?
19.1.0. The stage 1 work is the only part of this area that is finished, and the version number is how you can tell. TS 22.137
Q7.4 Where does this record link sensing to 6G?
TR 22.870 is the only specification in this record that links the two, and it does so with three documents. TR 22.870
Q7.5 Why does this course say nothing about the objective of the first SA1 study?
FS_Sensing has a work plan entry and an approval document but no description in readable form here. Everything said about it comes from its documents and the report it produced. FS_Sensing
8 SA2, and how the system is put together
Q8.1 Which group carries the largest share of the sensing documents?
SA2 has the largest count of any group in this record, and it leads both the architecture study and the architecture rule-writing. SA2
Q8.2 What does the architecture study say it investigates?
That is its scope, word for word, with a sub-set of use cases named as examples — commercial, automotive, public safety and emergency services. the scope of 23.700-14
Q8.3 What is a "Sensing Function"?
TR 23.700-14 defines it in one line. It is a logical function, which means a responsibility in the architecture, not a box. "Sensing Function" as 23.700-14 defines it
Q8.4 What does the Sensing-ARC work item say it is specifying against?
The objective names clause 8 of the study report and then lists the key issues it will turn into specification text, starting with the system architecture to support the sensing service. the objective of Sensing-ARC
Q8.5 How many sensing change requests has TS 23.501 received?
13 change requests, updating the architecture reference model and the network functions in it. TS 23.502 has 8, for the procedures. TS 23.501
Q8.6 What state is TS 23.137, the stage 2 specification, in?
0.3.0 — below 1.0.0, so a draft. 262 documents name it, but it is not yet a rule anybody has to follow. TS 23.137
9 Security, applications, management and protocols
Q9.1 What state is the security study in?
TR 33.777 stands at 0.6.0, below 1.0.0, so it is a draft. Its documents run to SA3#128 and 226 of them name it. TR 33.777
Q9.2 What is SA6's work item for?
That is the objective in its own words. SA6 works above the network, on the services applications use rather than on the network itself. the objective of Sensing-APP
Q9.3 Which existing SA6 specification has taken the most sensing change requests?
22 change requests, which fits the whole area narrowing onto drones. TS 23.437 for spatial maps has seven and TS 23.286 for vehicles three. TS 23.255
Q9.4 SA5 runs two separate studies here. What are they about?
FS_Sensing_CH is charging, aimed at TR 28.893, and FS_Sensing_OAM is management, aimed at TR 28.895. Both were opened at SA#110. FS_Sensing_CH
Q9.5 What does the CT work add to TS 29.510?
TS 29.510 has three sensing change requests, updating the registry so that the Sensing Function can register itself and be discovered. TS 29.510
Q9.6 What is TS 29.545?
It is the new protocol specification, created by this work, and one document in this record names it. Stage 3 has only just begun. TS 29.545
10 The specifications, one at a time
Q10.1 How many specifications does this work touch, and out of how many?
27 specifications, against 3599 active ones altogether. It is a small footprint, and most of it is documents this work created itself. 27 specifications this work touches
Q10.2 Which document should somebody new to this subject read first?
It is short and it defines the words every other document in the area uses. Everything else assumes you have read it. TS 22.137
Q10.3 What is TR 38.901 for, outside sensing?
It is the assumption set for radio simulation across all of 3GPP, which is why adding sensing to it had to happen before anything could be evaluated. TR 38.901
Q10.4 Two more specifications were left out of the register. Why?
The rule was two documents or a work item listing. One document alone is not enough evidence of a link. 2 specifications are named by a single document only
Q10.5 Which specification is the stage 3 protocol for the new function?
TS 29.545, "Sensing Function Services; Stage 3", created by this work and standing at 0.1.0. TS 29.510 is the registry it registers in. TS 29.545
11 What the shape of the paperwork says
Q11.1 What does the ratio of pCRs to change requests say about this area?
2036 documents are proposed text for study reports and 136 are changes to published specifications. The homework far outweighs the rule-writing. 2036 Sensing documents of type pCR
Q11.2 Which document has received the most sensing change requests?
46. The next largest are TR 38.901 with 23 and TS 23.255 with 22. TS 23.501, the document that would matter most, has 13. TR 22.837
Q11.3 Why do the per-year document counts not add up to 3492?
The five per-year counts fall short of 3492 by exactly the 78 documents that carry no upload time. 78 Sensing documents carry no upload time
Q11.4 How many of the area's documents are marked Release 20?
2069, against 1416 marked Release 19. Most of this work is still ahead of the record rather than behind it. 2069 Sensing documents marked Rel-20
Q11.5 What is the second largest kind of document here?
968 discussion papers — arguments with no text attached. The second largest kind here is somebody making a case rather than proposing words. 968 Sensing documents of type discussion
12 Where the work stands, and why there are no dates
Q12.1 Which part of this area is completely finished?
TS 22.137 stands at 19.1.0 and TR 22.837 at 19.4.0, both approved by the plenary, and no SA1 document on the subject has appeared since. TS 22.137
Q12.2 What state is the security study in?
Below 1.0.0 means a draft. The security and privacy questions of sensing are not settled. TR 33.777
Q12.3 How many pieces of rule-writing are running at once?
SA2 writes stage 2, SA6 the application layer, RAN3 the radio side and CT4 stage 3. None of the four has finished. Sensing-ARC
Q12.4 Can this record tell you when Release 20 will be finished?
SP-260110 is recorded as approved at SA#111. That is a meeting code, not a date, and nothing here converts one into the other. SP-260110
Q12.5 TR 28.893 stands at 1.0.0 and TR 28.895 at 0.3.0. What is the difference?
The charging study has reached 1.0.0 and the management study is at 0.3.0. Both sets of documents run to SA5#167, so both are recent. TR 28.893
13 How to follow this area yourself
Q13.1 Why is searching for the word "sensing" the wrong way to find this work?
Sidelink partial sensing, listen-before-talk channel sensing and the separate 6G work all use the word. Everything in this course was found by work item acronym instead. 2053 documents say sensing but mean other work
Q13.2 What does searching by acronym miss?
A proposal filed before a work item existed has nothing to be tagged with, and plenary approval documents are not tagged either. Search by acronym and by title, and expect the two to disagree. 440 Sensing documents carry no work item acronym
Q13.3 Which acronym returns the most documents?
The first radio study is the largest single acronym in this area, just ahead of the architecture study's 706. 776 documents carrying the work item FS_Sensing_NR
Q13.4 A document number starting RP- comes from where?
RP- is the RAN plenary, SP- the SA plenary, CP- the CT plenary. Working groups use S1-, S2-, R1-, R3-, C4- and so on. RP-261566
Q13.5 What is the shortest document that says what a group has promised to do?
One document, approved by a plenary, carrying the objective and the list of specifications it will change. RP-261566 is the radio one. RP-261566
14 What the record cannot tell you
Q14.1 What does this record say about why a decision was taken?
SP-250809 is recorded as "revised" and nothing more. Why it was revised, who asked, and what changed are not in this data. SP-250809
Q14.2 Can this course tell you what the radio study concluded?
No key issue, no candidate solution, no evaluation result. Anything you are told about sensing performance did not come from here and cannot be checked here. TR 38.765
Q14.3 Why is every count in this course a floor rather than a total?
Every plenary approval document is among those 440, as is everything filed before a work item existed to file it under. 440 Sensing documents carry no work item acronym
Q14.4 Which piece of work has no description on this machine at all?
It has a work plan entry and an approval document but no work item description, so no objective, no leadership line and no target document is recorded for it. FS_Sensing
Q14.5 Is sensing the largest or fastest-moving Release 20 topic?
2069 documents are marked Release 20 for sensing, and nothing in this data counts positioning, or AI, or ambient IoT, so no comparison is possible. 2069 Sensing documents marked Rel-20
Q14.6 Does this record name the people who did the work?
RP-234069 is recorded as coming from "Nokia (moderator)". The work item descriptions on this machine do name rapporteurs, and none of those names was put into the register. RP-234069