Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
SP-090466 | Draft agenda for TSG SA meeting #45 | other | TSG SA Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090467 | Draft report of TSG SA Meeting #44 | other | TSG SA Secretary | SP-45 | - | [WTS] [JSN] | |||
SP-090468 | CR0011R3 to 22.016 Rel-7 cat F: Clarify that each IMEI shall be unique | CR | Motorola, Samsung, Research In Motion | SP-45 | - | [WTS] [JSN] | |||
SP-090469 | CR0012R3 to 22.016 Rel-8 cat A: Clarify that each IMEI shall be unique | CR | Motorola, Samsung, Research In Motion | SP-45 | - | [WTS] [JSN] | |||
SP-090470 | CR0013R2 to 22.016 Rel-9 cat A: Clarify that each IMEI shall be unique | CR | Motorola, Samsung, Research In Motion | SP-45 | - | [WTS] [JSN] | |||
SP-090471 | Status Report from SA WG1 to TSG SA#45 | other | SA WG1 Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090472 | New WID: WID H(e)NB enhancements | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090473 | Stage 1 CRs to clarify that each IMEI shall be unique | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090474 | Stage 1 CRs on (Edata) - eCall Data Transfer | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090475 | Conditionally approved Stage 1 CRs on (Edata) - eCall Data Transfer | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090476 | Stage 1 CRs on (SAES) - 3GPP System Architecture Evolution Specification - Evolved Packet System (non RAN aspects) | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090477 | Stage 1 CRs on (EHNB) - Enhanced Home NodeB / eNodeB | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090478 | Stage 1 CRs on (eMMTel) - Multi-Media Telephony Service enhancements | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090479 | Stage 1 CR on EPNM Clarification | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090480 | Stage 1 CRs on (IMS_EMER_GPRS_EPS) - Support for IMS Emergency Calls over GPRS and EPS | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090481 | Stage 1 CRs on (IMS_SCC) - IMS Services Centralization and Continuity | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090482 | Stage 1 CRs on (IMS_SC_eIDT) - IMS Service Continuity - Inter Device Transfer enhancements | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090483 | Stage 1 CRs on (TEI10) - TEI-Rel 10 | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090484 | Stage 1 CRs on Local IP Traffic Offload | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090485 | Stage 1 CR on Enhancements for CPM-SMS Interworking | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090486 | Stage 1 CR on Completion of Communications on Not Logged-in (CCNL) | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090487 | TS 22.368 v1.0.0 Network Improvements for Machine Type Communications | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090488 | TR 22.947 v1.0.0 Study on Personal Broadcast Service | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090489 | TR 22.893 v1.0.0 Study on Identification of Advanced Requirements for IP Interconnection of Services | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090490 | Revised WID: Haptic services scope extension to IMS context. | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090491 | New WID: Study on IMS based Peer-to-Peer Content Distribution Services | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090492 | New WID: WID for IP-SM-GW enhancements for CPM-SMS Interworking | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090493 | New WID: WID on CCNL | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090494 | Rel-9 CR to TS 22.228 on 'Add the feature of completing dialed number to global form' | other | Nokia Siemens Networks, China Mobile | SP-45 | - | [WTS] [JSN] | |||
SP-090495 | CR to list of specs in 21.201 (Technical Specifications and Technical Reports relating to an Evolved Packet System (EPS) based 3GPP system) | other | J Meredith (MCC Specifications Manager) | SP-45 | - | [WTS] [JSN] | |||
SP-090496 | Specifications status at close of SA | other | J Meredith (MCC Specifications Manager) | SP-45 | - | [WTS] [JSN] | |||
SP-090497 | 3GPP Support Team Report | other | J Meredith (MCC Specifications Manager) | SP-45 | - | [WTS] [JSN] | |||
SP-090498 | LS from CT WG1: Reply to LS on IMS media plane security | other | CT WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090499 | LS from CT WG1: LS on SMS support over SGs | other | CT WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090500 | LS from CT WG1: LS on ME support in Rel-9 | other | CT WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090501 | LS from CT WG4: REPLY LS on IMS Media Plane Security | other | CT WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090502 | LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON FEMTOCELLS, 'FEMTO ACCESS NODES' | other | ITU-R WP5D | SP-45 | - | [WTS] [JSN] | |||
SP-090503 | LS from GSMA North America: Re: Response to Draft ITU-T Recommendation on Requirements for Land Mobile Alerting Broadcast Capabilities for Civic Purposes | other | GSMA North America | SP-45 | - | [WTS] [JSN] | |||
SP-090504 | LS from ITU-T SG 16 - Q10/16: LS to ETSI STQ and 3GPP SA, SA1, SA2, SA4 on lossless coding of G.711 bitstreams | other | ITU-T SG 16 - Q10/16 | SP-45 | - | [WTS] [JSN] | |||
SP-090505 | LS from ETSI TC M2M: ETSI TC M2M specifications | other | ETSI TC M2M | SP-45 | - | [WTS] [JSN] | |||
SP-090506 | LS from OMA: Response to question regarding release of 3GPP MBMS references in BCAST specifications | other | OMA BCAST WG | SP-45 | - | [WTS] [JSN] | |||
SP-090507 | LS from SA WG1: Change in eCall requirements | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090508 | LS from SA WG1: LS on 3GPP specifying use of E.212 resource | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090509 | LS from SA WG1: LS on LIPA WID and terminology for offload of selected IP traffic | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090510 | LS from SA WG1: Answer LS on Local Call Local Switch | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090511 | LS from SA WG2: LS on SMS support over SGs | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090512 | LS from SA WG3: Reply LS on Local IP Access and Internet Offload | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090513 | LS from SA WG3: LS on IMS media plane security | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090514 | LS from SA WG5: LS on UE management over Itf-N | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090515 | LS from TIA TR-45.8: Re: Response to Draft ITU-T Recommendation on Requirements for Land Mobile Alerting Broadcast Capabilities for Civic Purposes | other | TR-45.8 | SP-45 | - | [WTS] [JSN] | |||
SP-090516 | SA WG3 Status Report | other | SA WG3 Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090517 | Release 8 CRs to 33.401 (SAES) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090518 | Release 9 CRs to 33.401 | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090519 | Release 8 CRs to 33.402 (SAES) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090520 | CRs to 33.820 (FS_HNB_Sec) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090521 | CRs to 33.203 | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090522 | Release 8 CRs on Lawful Interception (LI8) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090523 | Release 8 CRs to 33.223 (GBAPush) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090524 | Release 9 CRs to 33.220 (eGBAPush) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090525 | Release 9 CR on 128-bit key encryption (A5/4-GEA4) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090526 | CR to 33.234 on Addition of cipher suite for interworking WLAN (TEI9) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090527 | TS 33.320 on 3GPP Security Aspects of Home NodeB and Home eNodeB v1.0.0 for SA information | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090528 | TS 33.224 Generic Authentication Architecture (GAA); Generic push layer, Version 2.0.0 for SA approval | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090529 | TR 33.924 'Identity Management and 3GPP Security Interworking', Version 1.0.0 for SA information | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090530 | TS 33.328 on IMS Media Plane Security version 1.0.0 for SA information | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090531 | TR 33.828 on IMS Media Plane Security version 1.4.2 for SA information | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090532 | WID for Lawful Interception in Release 9 | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090533 | SA WG5 Status Report | other | SA WG5 Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090534 | Rel-8 CRs on OAM&P (OAM8) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090535 | Rel-9 CRs on OAM&P (OAM9) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090536 | Rel-8 CRs on Charging Management (CH8) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090537 | Rel-9 CRs on Charging Management (CH9) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090538 | Rel-9 CRs on Multi-Media Telephony Service enhancements (eMMTel) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090539 | Rel-8 CRs on 3G Home NodeB OAM&P Type 1 Management Interface (HNB-3G_OAM) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090540 | Rel-9 CR on 3G Home NodeB and LTE Home eNodeB OAM&P Type 1 definition (HNB_eHNB-OAM_Type1) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090541 | Rel-9 CRs on MBMS Charging in EPS (MBMS_EPS) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090542 | Rel-8 CRs on LTE SON (E_UTRAN-OAM, LTE_SON-OAM) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090543 | TS 32.127 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); SOAP solution set for SA information | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090544 | TS 32.447 Telecommunication management; Trace Management Integration Reference Point (IRP): SOAP Solution Set (SS) for SA Information | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090545 | TR 32.822 Telecommunication management; Study on System Maintenance over Itf-N for SA approval | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090546 | TR 32.823 Telecommunication management; Self-Organizing Networks (SON); Study on self-healing for SA approval | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090547 | TS 32.452 Telecommunication management; Performance measurements Home Node B (HNB) SubSystem for SA information | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090548 | TS 32.771 Telecommunication management; Home Node B (HNB) SubSystem Integration Reference Point (IRP); Requirements for SA information | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090549 | TS 32.772 Telecommunication management; Home Node B (HNB) SubSystem Integration Reference Point (IRP); Network Resource Model (NRM) for SA information | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090550 | TS 32.781 Telecommunication management; Home eNode B (HeNB) SubSystem Integration Reference Point (IRP); Requirements for SA information | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090551 | TS 32.541 Telecommunication management; Self-Organizing Networks (SON); Self-healing concepts and requirements for SA information | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090552 | TS 32.593 Telecommunication management; Procedure flows for Type 1 interface H(e)NB to H(e)NB Management System (H(e)MS) for SA information | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090553 | Creation of Missing Rel-8 Specifications | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090554 | Support of SDP in IMS Charging (IMSSDP-CH) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090555 | DRAFT 3GPP Work Plan before TSG SA#45 | other | MCC Work Plan Manager (A. Zoicas) | SP-45 | - | [WTS] [JSN] | |||
SP-090556 | 3GPP Work Plan review at Plenary #45 | other | MCC Work Plan Manager (A. Zoicas) | SP-45 | - | [WTS] [JSN] | |||
SP-090557 | DRAFT 3GPP Work Plan update end-of-CT/RAN#45 & post-GERAN#43 | other | MCC Work Plan Manager (A. Zoicas) | SP-45 | - | [WTS] [JSN] | |||
SP-090558 | Challenge concerning SA WG4 working agreement and CRs about push method (TD S4-090552 and TD S4-090473) | other | DSNA-DTI, Institut Telecom | SP-45 | - | [WTS] [JSN] | |||
SP-090559 | Release 9 CR on Lawful Interception (LI9) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090560 | CR to 33.102 on Reformulation of security procedure of HSPA SRVCC (TEI8) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090561 | TSG S4 Status Report at TSG-SA#45 | other | SA WG4 Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090562 | CRs to TS 26.234 on 'Packet Switched Streaming Service (Enhancements) (PSSe)' (Release 7 and Release 8) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090563 | CR to TS 26.237 on 'IMS Initiated and controlled PSS and MBMS User Services (IMS_PSS_MBMS_US)' (Release 8) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090564 | TR 26.969 (2009-06) 'eCall Data Transfer; In-band modem solution; Characterisation Report (Release 8)' V 2.0.0 | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090565 | CRs to TS 26.267, TS 26.268 and TS 26.269 on '(Edata) - eCall Data Transfer (eCall_Phase2)' (Release 8) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090566 | CRs to TS 26.114 on 'IMS Multimedia Telephony; Media Handling and Interaction Enhancements (MTSI-MHI and MTSI_eMHI)' (Release 7 and Release 8) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090567 | CRs to TS 26.234, TS 26.244 and TS 26.346 on 'Extending PSS and MBMS User Services for optimized Mobile TV (PSS_MBMS_OMTV)' (Release 8) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090568 | CRs to TS 26.102, TS 26.131 and TS 26.132 on 'Technical Enhancements and Improvements (TEI8)' (Release 8 and Release 9) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090569 | CR to TS 26.142 on 'Clean-up corrections to TS 26.142 (DIMS)' (Release 8) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090570 | CRs to TS 26.237 on 'IMS based PSS and MBMS User Service extensions (IMS_PSS_MBMS_US_EXT)' (Release 9) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090571 | CR to TS 26.114 on 'Managing MTSI Media Adaptation (M3A)' (Release 9) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090572 | CRs to TS 26.234 and to TS 26.346 on 'PSS and MBMS Aspects (PMA-MBS_Ext)' (Release 9) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090573 | CRs to TS 26.114 and TS 26.132 on 'Technical Enhancements and Improvements (TEI9)' (Release 9) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090574 | CR to TS 26.290 on 'Correction of references (AMRWB+)' (Release 9) | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090575 | New WID on 'Distortion Measurement Test Methods and Requirements (DTMR)' | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090576 | CR 26.267-0003 rev 1 and CR 26.268-0007 on 'Integration of IVS-initiated signalling option (Release 8), put under 'working agreement' status at TSG SA WG4 #55 meeting | other | SA WG4 | SP-45 | - | [WTS] [JSN] | |||
SP-090577 | Mobile Terminated Emergency Call with CSFB feature | other | Fujitsu, Hitach, KDDI, Kyocera, Mitsubishi, NEC, NTC, NTT DOCOMO, Panasonic, Sharp, Toshiba | SP-45 | - | [WTS] [JSN] | |||
SP-090578 | SA WG2 Status Report to TSG SA | other | SA WG2 Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090579 | 2 CRs to 23.292 on ICSRA-St2 (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090580 | 2 CRs to 23.401 on ETWS (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090581 | 1 CR to 23.237 on Reference correction for dual-stack MIPv6 in 23.327 (IWLAN_Mob, Rel-8) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090582 | 8 CRs to 23.203 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090583 | 12 CRs to 23.221, 23.272, 23.292 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090584 | 10 CRs to 23.060/23.401 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090585 | 12 CRs to 23.060 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090586 | 12 CRs to 23.401 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090587 | 14 CRs to 23.401 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090588 | 12 CRs to 23.401 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090589 | 12 CRs to 23.401 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090590 | 14 CRs to 23.402 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090591 | 14 CRs to 23.402 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090592 | 6 CRs to 23.060, 23.401, 23.203 on SAES (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090593 | 14 CRs to 23.272 on SAES-CSFB (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090594 | 2 CRs to 23.401 on SAES-SA-FP_LTE-GTP-St2 (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090595 | 10 CRs to 23.216 on SAES-SRVCC (Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090596 | 10 CRs to 23.228, 23.002, 23.060 on Technical Enhancements (TEI8, Rel-8, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090597 | 11 CRs to 23.002, 23.060, 23.203 on EHNB (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090598 | 12 CRs to 23.401 on EHNB (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090599 | 3 CRs to 23.402 on eANDSF (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090600 | 15 CRs to 23.002, 23.060 on IMS_EMER_GPRS (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090601 | 12 CRs to 23.167, 23.203, 23.216, 23.221, 23.237 on IMS_EMER_GPRS (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090602 | 19 CRs to 23.401 on IMS_EMER_GPRS_EPS (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090603 | 12 CRs to 23.237 on IMS_SCC-SPI (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090604 | 12 CRs to 23.237 on IMS_SCC-SPI (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090605 | 7 CRs to 23.271, 23.401 on LCS_CPS_EPS (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090606 | 11 CRs to 23.246, 23.401 on MBMS_EPS (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090607 | 6 CRs to 23.203, 23.402 on MUPSAP (Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090608 | 13 CRs to 23.060, 23.167, 23.203, 23.216 on Technical Enhancements (Rel-9, TEI9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090609 | 13 CRs to 23.221, 23.228, 23.246, 23.251, 23.272, 23.401 on Technical Enhancements (Rel-9, TEI9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090610 | 1 CR to 23.401: Adding Support for Explicit Congestion Notification (LTEimp-Vocoder, Rel-9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090611 | TR 23.830, Version 1.0.0: Architecture aspects of Home NodeB and Home eNodeB (Release 9) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090612 | TR 23.823 version 1.0.0: Feasibility Study on NAS Node Selection Function above BSC/RNC (Release 10) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090613 | New WID (BB): IMS Inter-UE Transfer enhancements | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090614 | Revised WID: Multi Access PDN Connectivity | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090615 | New WID for IP-SM-GW enhancements for CPM-SMS Interworking | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090616 | New WID on IP Flow Mobility and seamless WLAN offload | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090617 | New WID: Enabling Encoder Selection and Rate Adaptation for UTRAN and E-UTRAN | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090618 | New WID: Local IP Access and Selected IP Traffic Offload | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090619 | New WID: Network Improvements for Machine-Type Communications (NIMTC) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090620 | Description Alignment on Access Class Barring Between Stage 1 and Stage 3 Specifications | other | NTT DOCOMO, KDDI, SOFTBANK MOBILE | SP-45 | - | [WTS] [JSN] | |||
SP-090621 | Draft report of TSG SA Meeting #44 | other | TSG SA Secretary | SP-45 | - | [WTS] [JSN] | |||
SP-090622 | Finalization of eCall Release-8 Specifications | other | Qualcomm Europe | SP-45 | - | [WTS] [JSN] | |||
SP-090623 | On eCall finalization & the "PUSH" option | other | Qualcomm Europe | SP-45 | - | [WTS] [JSN] | |||
SP-090624 | IVS transmitter termination correction | CR | Qualcomm Europe | SP-45 | - | [WTS] [JSN] | |||
SP-090625 | Introduction of test cases for IVS-initiated signalling | CR | Qualcomm Europe | SP-45 | - | [WTS] [JSN] | |||
SP-090626 | Release 8 CRs to 33.401 (SAES) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090627 | Rel-9 CRs on OAM&P (OAM9) | other | SA WG5 | SP-45 | - | [WTS] [JSN] | |||
SP-090628 | Report of TSG GERAN activities to TSG SA #45 | other | TSG GERAN Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090629 | A joint meeting between 3GPP and IETF on IPv6 migration | other | China Mobile | SP-45 | - | [WTS] [JSN] | |||
SP-090630 | TSG CT Plenary Status report | other | TSG CT Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090631 | Draft report of TSG CT#45 | other | TSG CT Secretary | SP-45 | - | [WTS] [JSN] | |||
SP-090632 | 3GPP IETF Dependencies status for TSGs #45 | other | TSG CT Chairman (IETF Liaison) | SP-45 | - | [WTS] [JSN] | |||
SP-090633 | Rel-8/Rel-9 CSFB (to GERAN/UTRAN) performance evaluation and discussion | other | China Unicom, Huawei | SP-45 | - | [WTS] [JSN] | |||
SP-090634 | Discussion on 'Extended H(e)NB features' work item | other | Deutsche Telekom | SP-45 | - | [WTS] [JSN] | |||
SP-090635 | Release 9 CRs on 128-bit key encryption (A5/4-GEA4) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090636 | Release 8 CRs to 33.401 (SAES) | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090637 | Challenge concerning working agrement and CRs about push method (TD S4-090552 and TD S4-090473) (update) | other | DSNA-DTI, Institut Telecom | SP-45 | - | [WTS] [JSN] | |||
SP-090638 | Proposal for a workshop on BBF access to EPC | other | Verizon, AT&T, T-Mobile, Ericsson, Cisco | SP-45 | - | [WTS] [JSN] | |||
SP-090639 | Discussion on 'Extended H(e)NB features' work item | other | Deutsche Telekom | SP-45 | - | [WTS] [JSN] | |||
SP-090640 | LS from ITU-T SG13: LS to 3GPP and 3GPP2 on mobility coordination for NGN | other | ITU-T SG13 | SP-45 | - | [WTS] [JSN] | |||
SP-090641 | 4 CRs to 23.221, 23.272, 23.292 on Support of SMS over SGs (SAES, Rel-8, Rel-9) | other | MCC, SA WG2 chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090642 | Reaction to the discussion paper on 'Extended H(e)NB features' work item | other | SOFTBANK MOBILE Corp., NEC | SP-45 | - | [WTS] [JSN] | |||
SP-090643 | LS from RAN: Reply LS on most recent SA WG2 Reply LS on data forwarding for inter RAT HO | other | TSG RAN | SP-45 | - | [WTS] [JSN] | |||
SP-090644 | LS from TC M2M: LS to ETSI Technical committees and 3GPP on the EU Smart meter mandate | other | ETSI TC M2M | SP-45 | - | [WTS] [JSN] | |||
SP-090645 | Draft report of TSG CT#45 | other | TSG CT Secretary | SP-45 | - | [WTS] [JSN] | |||
SP-090646 | Draft Report of TSG RAN#45 meeting | other | TSG RAN Secretary (MCC) | SP-45 | - | [WTS] [JSN] | |||
SP-090647 | TS 55.226 'Specification of the A5/4 encryption algorithms for GSM and ECSD, and the GEA4 encryption algorithm for GPRS; Document 1: A5/4 and GEA4 specification', Version 2.0.0 | other | SA WG3 | SP-45 | - | [WTS] [JSN] | |||
SP-090648 | Way forward (from SA#45) on CSFB performance improvement | other | Huawei | SP-45 | - | [WTS] [JSN] | |||
SP-090649 | Answer to LS on the EU Smart meter mandate | other | TSG SA | SP-45 | - | [WTS] [JSN] | |||
SP-090650 | Report of TSG RAN activities to TSG SA #45 | other | TSG RAN Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090651 | Stage 1 CRs on (IMS_SCC) - IMS Services Centralization and Continuity | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090652 | Stage 1 CRs on (IMS_SC_eIDT) - IMS Service Continuity - Inter Device Transfer enhancements | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090653 | New WID: System aspects of vocoder rate adaptation for LTE | other | Qualcomm Europe | SP-45 | - | [WTS] [JSN] | |||
SP-090654 | LTE-Advanced ITU submission | other | TSG RAN Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090655 | 23.402 CR0807R2 | other | SA WG2 Chairman, TSG CT Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090656 | Draft Report of TSG RAN#45 meeting | other | TSG RAN Secretary (MCC) | SP-45 | - | [WTS] [JSN] | |||
SP-090657 | TSG CT Plenary Status report | other | TSG CT Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090658 | Updated WID: Network Improvements for Machine-Type Communications (NIMTC) | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090659 | Revised WID: Multi Access PDN Connectivity | other | SA WG2 | SP-45 | - | [WTS] [JSN] | |||
SP-090660 | 22.228 CR0109R3 | other | TSG SA | SP-45 | - | [WTS] [JSN] | |||
SP-090661 | LS to BBF on workshop on BBF access to EPC | other | TSG SA | SP-45 | - | [WTS] [JSN] | |||
SP-090662 | Report of TSG RAN activities to TSG SA #45 | other | TSG RAN Chairman | SP-45 | - | [WTS] [JSN] | |||
SP-090663 | 23.402 CR0807R2: Conflicting policies from V-ANDSF and H-ANDSF (Rel-9) | other | Nokia, Nokia Siemens Networks | SP-45 | - | [WTS] [JSN] | |||
SP-090664 | Revised WID: Haptic services scope extension to IMS context. | other | SA WG1 | SP-45 | - | [WTS] [JSN] | |||
SP-090665 | LS on Joint Workshop on IPv6 Migration | other | TSG SA (China Mobile) | SP-45 | - | [WTS] [JSN] | |||
SP-090666 | LS on eCall data transfer | LS out | Drafting group (Airbiquity, DSNA-DTI, Nokia, SFR, Qualcomm) | SP-45 | - | [WTS] [JSN] | |||
SP-090667 | Description Alignment on Access Class Barring Between Stage 1 and Stage 3 Specifications | other | NTT DOCOMO, KDDI, SOFTBANK MOBILE | SP-45 | - | [WTS] [JSN] | |||
SP-090668 | 22.101 CRxxxx: Providing eCall indication to the PSAP | other | DSNA-DTI, Institut telecom | SP-45 | - | [WTS] [JSN] | |||
SP-090669 | Description Alignment on Access Class Barring Between Stage 1 and Stage 3 Specifications | other | NTT DOCOMO, KDDI, SOFTBANK MOBILE | SP-45 | - | [WTS] [JSN] | |||
SP-090670 | LS to BBF on workshop on BBF access to EPC | other | TSG SA | SP-45 | - | [WTS] [JSN] | |||
SP-090671 | LS on Joint Workshop on IPv6 Migration | LS out | TSG SA | SP-45 | - | [WTS] [JSN] | |||
SP-090672 | Answer to LS on the EU Smart meter mandate | other | TSG SA | SP-45 | - | [WTS] [JSN] | |||
SP-090673 | LS to BBF on workshop on FMC access to EPC | LS out | TSG SA | SP-45 | - | [WTS] [JSN] | |||
SP-090674 | Answer to LS on the EU Smart meter mandate | LS out | TSG SA | SP-45 | - | [WTS] [JSN] | |||
SP-090675 | 3GPP Work Plan update post TSG SA#45 | other | MCC Work Plan Manager (A. Zoicas) | SP-45 | - | [WTS] [JSN] | |||
SP-090676 | 33.401 CR0360R1; 33.401 CR0361R1 (SAES) | other | SA WG3 | SP-45 | - | [WTS] [JSN] |
211 documents (1.0339360237122 seconds)