Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-184000 | Agenda | agenda | WG Chairman |
S5-ah-33662 AI: 2 |
approved | [WTS] [JSN] | |||
S5-184001 | IPR and legal declaration | other | WG Chairman |
S5-ah-33662 AI: 3 |
noted | [WTS] [JSN] | |||
S5-184002 | Time Plan for OAM&P |
other revised to S5-184230 |
WG Vice Chair (Huawei) |
S5-ah-33662 AI: 4.1 |
revised | [WTS] [JSN] | |||
S5-184003 | OAM&P SWG action list | other | WG Vice Chair (Huawei) |
S5-ah-33662 AI: 4.1 |
noted | [WTS] [JSN] | |||
S5-184004 | Minutes of OAM&P SWG plenary | report | WG Vice Chair (Huawei) |
S5-ah-33662 AI: 4.1 |
noted | [WTS] [JSN] | |||
S5-184005 | Minutes of Management and orchestration of 5G networks and network slicing | report | Rapporteur (Ericsson) |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] | |||
S5-184006 | Minutes of Provisioning of 5G networks and network slicing | report | Rapporteur (Huawei) |
S5-ah-33662 AI: 4.2.2 |
noted | [WTS] [JSN] | |||
S5-184007 | Minutes of Network Resource Model (NRM) for 5G networks and network slicing | report | Rapporteur (Nokia) |
S5-ah-33662 AI: 4.2.3 |
noted | [WTS] [JSN] | |||
S5-184008 | Minutes of Fault Supervision for 5G networks and network slicing |
report revised to S5-184371 |
Rapporteur (ZTE) |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] | |||
S5-184009 | Minutes of Assurance data and Performance Management for 5G networks and network slicing | report | Rapporteur (Intel) |
S5-ah-33662 AI: 4.2.5 |
noted | [WTS] [JSN] | |||
S5-184010 | Minutes of Management of 5G Trace management | report | Rapporteur(Nokia) |
S5-ah-33662 AI: 4.2.6 |
withdrawn | [WTS] [JSN] | |||
S5-184011 | Minutes of Management and virtualization aspects of 5G networks |
report revised to S5-184373 |
Rapporteur Intel) |
S5-ah-33662 AI: 4.2.7 |
revised | [WTS] [JSN] | |||
S5-184012 | Minutes for REST Solution Sets | report | Rapporteur(Nokia) |
S5-ah-33662 AI: 4.2.8 |
noted | [WTS] [JSN] | |||
S5-184013 | CH Agenda and Time Plan | agenda | CH SWG Chair |
S5-ah-33662 AI: 5.1 |
approved | [WTS] [JSN] | |||
S5-184014 | Revision of SA5#119 OAM&P SWG Exec Report | report | Huawei Technologies France |
S5-ah-33662 AI: 4.1 |
noted | [WTS] [JSN] | |||
S5-184015 | Discussion paper on value of secondary RAT type | discussion | China Mobile | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.1 |
noted | [WTS] [JSN] | |
S5-184016 | pCR 32.291 Update the category of charging attributes | pCR | China Mobile | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] |
S5-184017 | pCR 32.255 Update the category of charging information | pCR | China Mobile | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184018 | pCR draft TS 28541 implement Endorsement S5-183625 |
pCR revised to S5-184254 |
Ericsson Inc. | 28.541 0.3.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184019 | pCR draft TS 28540 use of one model Requirement |
pCR revised to S5-184255 |
Ericsson Inc. | 28.543 0.3.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184020 | pCR draft TS 28540 add Requirement |
pCR revised to S5-184024 |
Ericsson Inc. | 28.54 0.3.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184021 | pCR draft TS 28541 gNB cell state handling |
pCR revised to S5-184256 |
Ericsson Inc. | 28.541 0.3.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184022 | pCR draft TS 28541 merge model of gNB with en-gNB |
pCR revised to S5-184253 |
Ericsson Inc. | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184023 | pCR draft TS 28541 BWP config |
pCR revised to S5-184257 |
Ericsson Inc. | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184024 | pCR draft TS 28540 add Requirement |
pCR revision of S5-184020 |
Ericsson Inc. | 28.54 0.3.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
noted | [WTS] [JSN] |
S5-184025 | Rel-15 pCR 32.255 Correction on the mesage flow for PDU Session establishment |
pCR revised to S5-184209 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184026 | Discussion Paper on the Trigger Configuration | discussion | Huawei Technologies Co. Ltd. | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
noted | [WTS] [JSN] | |
S5-184027 | Discussion Paper on Usage Reporting | discussion | Huawei Technologies Co. Ltd. | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
noted | [WTS] [JSN] | |
S5-184028 | Rel-15 pCR 32.255 Proposal for the Charging Session |
pCR revised to S5-184206 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184029 | Rel-15 pCR 32.255 Proposal on PCC Rules for Converged Charging |
pCR revised to S5-184202 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184030 | Rel-15 pCR 32.255 Proposal on the Centralized or Decentralized unit determination and Centralized rating scenarios | pCR | Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
withdrawn | [WTS] [JSN] |
S5-184031 | Rel-15 pCR 32.255 Proposal on the Chargeable Events | pCR | Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184032 | Rel-15 pCR 32.255 Proposal on the Message Content |
pCR revised to S5-184205 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184033 | Rel-15 pCR 32.255 Proposal on the Roaming Requirement |
pCR revised to S5-184210 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184034 | Rel-15 pCR 32.255 Proposal on the Trigger Configuration |
pCR revised to S5-184199 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184035 | Rel-15 pCR 32.255 Proposal on the Triggers |
pCR revised to S5-184198 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184036 | Rel-15 pCR 32.290 Correction on the Converged Charging Scenarios |
draftCR revised to S5-184219 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184037 | Discussion Paper on Immediate start of service delivery | discussion | Huawei Technologies Co. Ltd. |
S5-ah-33662 AI: 5.2.2 |
noted | [WTS] [JSN] | |||
S5-184038 | Rel-15 pCR 32.290 Proposal on Charging Service Operation |
draftCR revised to S5-184225 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184039 | Rel-15 pCR 32.290 Proposal on CTF in 5G Charging |
draftCR revised to S5-184222 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184040 | Rel-15 pCR 32.290 Proposal on Message Content |
draftCR revised to S5-184228 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184041 | Rel-15 pCR 32.290 Proposal on Nchf_ConvergedCharging_Notify service operation |
draftCR revised to S5-184227 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184042 | Rel-15 draftCR 32.290 Proposal on SCUR immediate start of service delivery | draftCR | Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
noted | [WTS] [JSN] | |
S5-184043 | Rel-15 pCR 32.290 Proposal on the Requirement for Converged Charging |
draftCR revised to S5-184223 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184044 | Rel-15 pCR 32.291 Proposal on Data Model |
pCR revised to S5-184296 |
Huawei Technologies Co. Ltd. | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] |
S5-184045 | Rel-15 pCR 32.291 Proposal on Message Flow of the Service Operation |
pCR revised to S5-184294 |
Huawei Technologies Co. Ltd. | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] |
S5-184046 | Rel-15 pCR 32.291 Proposal on Nchf_ ConvergedCharging Service APIs |
pCR revised to S5-184291 |
Huawei Technologies Co. Ltd. | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] |
S5-184047 | Rel-15 pCR 32.291 Proposal on Service Definition |
pCR revised to S5-184292 |
Huawei Technologies Co. Ltd. | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] |
S5-184048 | pCR 28.540 Merge current 5GNRM specifications into one single specification |
pCR revised to S5-184326 |
Nokia, Nokia Shanghai Bell | 28.54 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184049 | pCR TS 28.541 Update the attribute’s properties' setting | pCR | Nokia, Nokia Shanghai Bell | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184050 | pCR TS 28.543 Update the attribute’s properties' setting | pCR | Nokia, Nokia Shanghai Bell | 28.543 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184051 | pCR TS 28.543 Update NRF and NSSF transport view diagram with interfaces for international roaming |
pCR revised to S5-184261 |
Nokia, Nokia Shanghai Bell | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184052 | pCR TS 28.541 Add JSON-based SS definitions for gNB modeling | pCR | Nokia, Nokia Shanghai Bell | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184053 | pCR TS 28.541 Add XML-based SS definitions for gNB modeling | pCR | Nokia, Nokia Shanghai Bell | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184054 | pCR TS 28.543 Add XML-based SS definitions for 5GC modeling | pCR | Nokia, Nokia Shanghai Bell | 28.543 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184055 | Draft CR 28.659 Update E-UTRAN SS definitions to support EN-DC management | CR | Nokia, Nokia Shanghai Bell | 28.659 15.1.0 CR#23 catB | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
withdrawn | [WTS] [JSN] |
S5-184056 | Draft CR 28.657 Add requirement to support ng-eNB management | CR | Nokia, Nokia Shanghai Bell | 28.657 14.0.0 CR#7 catB | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
withdrawn | [WTS] [JSN] |
S5-184057 | Draft CR 28.658 Update E-UTRAN IS definitions to support ng-eNB management | CR | Nokia, Nokia Shanghai Bell | 28.658 15.0.0 CR#27 catB | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
withdrawn | [WTS] [JSN] |
S5-184058 | Draft CR 28.709 Update EPC SS definitions to support management of EN-DC and 5G interworking | CR | Nokia, Nokia Shanghai Bell | 28.709 14.1.0 CR#9 catB | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
withdrawn | [WTS] [JSN] |
S5-184059 | Revised WID Network Resource Model (NRM) for 5G networks and network slicing |
WID revised revised to S5-184328 |
Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] | |
S5-184060 | Proposal of TDoc discussion sequence for agenda item 4.2.3 | other | Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
noted | [WTS] [JSN] | |
S5-184061 | Discussion paper re-organization of 5G management specifications |
discussion revised to S5-184271 |
Huawei | Rel-15 |
S5-ah-33662 AI: 4.1 |
revised | [WTS] [JSN] | ||
S5-184062 | pCR 28.530 Rapporteur clean-up proposal on editor notes |
pCR revised to S5-184231 |
Huawei | 28.53 1.0.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184063 | pCR 28.530 Rapporteur clean-up proposal on alignment of SBMA |
pCR revised to S5-184232 |
Huawei | 28.53 1.0.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184064 | pCR 28.530 Add UC for network management data analysis |
pCR revised to S5-184237 |
Huawei | 28.53 1.0.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184065 | pCR 28.533 Add MS overview | pCR | Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] |
S5-184066 | pCR 28.533 Re-organize the deployment model sections | pCR | Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184067 | pCR 28.533 Add deployment model for management service and ONAP federation | pCR | Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] |
S5-184068 | pCR 28.533 Add deployment model for management of network and network slice |
pCR revised to S5-184319 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184069 | pCR 28.533 Solutions for management of 5G network and network slicing |
pCR revised to S5-184236 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184070 | pCR 28.533 Add overview of PM measurements | pCR | Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] |
S5-184071 | pCR 28.533 add DAMF deployment scenario |
pCR revised to S5-184314 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184072 | pCR 28.533 Exposure governance precondition |
pCR revised to S5-184316 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184073 | pCR 28.533 Exposure governance clarification |
pCR revised to S5-184317 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184074 | pCR 28.533 Operator network management systems cooperation | pCR | Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] |
S5-184075 | pCR 28.533 Management service unique identifier |
pCR revised to S5-184315 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184076 | pCR 28.531 Rapporteur clean-up proposal |
pCR revised to S5-184239 |
Huawei | 28.531 1.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184077 | pCR 28.532 Rapporteur clean-up proposal | pCR | Huawei | 28.531 1.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184078 | pCR 28.531 Remove some editor's notes | pCR | Huawei | 28.531 1.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184079 | pCR 28.532 Update on network slice information model |
pCR revised to S5-184287 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184080 | pCR 28.532 Clean-up network slice related procedures |
pCR revised to S5-184242 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184081 | pCR 28.532 Clean-up network slice subnet and NF related procedures |
pCR revised to S5-184243 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184082 | pCR 28.532 Add RESTful solution for createMOI operation |
pCR revised to S5-184244 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184083 | pCR 28.532 Add RESTful solution for getMOIAttributes operation |
pCR revised to S5-184245 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184084 | pCR 28.532 Add RESTful solution for modifyMOIAttributes operation |
pCR revised to S5-184246 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184085 | pCR 28.532 Add RESTful solution for deleteMOI operation |
pCR revised to S5-184247 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184086 | pCR 28.532 Update on the information model parameter perfReq |
pCR revised to S5-184248 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184087 | pCR 28.550 Global alignment of management service names |
pCR revised to S5-184323 |
Intel Corporation (UK) Ltd | 28.55 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184088 | pCR 28.550 Update UC and requirements on management data analytics |
pCR revised to S5-184276 |
Intel Corporation (UK) Ltd | 28.55 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184089 | pCR 28.551 Add component types for measurement job management services |
pCR revised to S5-184279 |
Intel Corporation (UK) Ltd | 28.551 0.2.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184090 | pCR 28.551 Add component types for performance data file reporting services |
pCR revised to S5-184280 |
Intel Corporation (UK) Ltd | 28.551 0.2.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184091 | pCR 28.551 Add component types for performance data streaming services | pCR | Intel Corporation (UK) Ltd | 28.551 0.2.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
noted | [WTS] [JSN] |
S5-184092 | Discussion paper on KPI collection and reporting |
discussion revised to S5-184278 |
Intel Corporation (UK) Ltd | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] | ||
S5-184093 | Discussion paper on management service naming | discussion | Intel Corporation (UK) Ltd | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] | ||
S5-184094 | 28533 Discussion paper on management of non-slice-specific aspects of the network or subnetwork | discussion | Intel Corporation (UK) Ltd | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] | ||
S5-184095 | pCR 28.543 Add eEP_RP IOC and update existing EP_RP(s) |
pCR revised to S5-184260 |
Huawei | 28.543 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184096 | pCR 28.546 Procedures for subscribeAlarmNotify R4 |
pCR revised to S5-184274 |
Huawei | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184097 | pCR 28.546 VR alarm correlation R4 |
pCR revised to S5-184275 |
Huawei | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184098 | pCR 28.546 Update FS management services |
pCR revised to S5-184270 |
Huawei | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184099 | pCR 28.545 Update FS management services | pCR | Huawei | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
noted | [WTS] [JSN] |
S5-184100 | pCR 28.552 modification of Average delay DL air-interface | pCR | Huawei | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184101 | pCR 28.551 Add procedures for Network Slice Subnet Data Analytics |
pCR revised to S5-184334 |
Huawei | 28.551 0.2.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184102 | pCR 28.550 Add UC and requirement for management analytics KPIs for networks |
pCR revised to S5-184277 |
Huawei | 28.55 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184103 | pCR 28.533 Update functional management architecture to include MDAF |
pCR revised to S5-184320 |
Intel Corporation (UK) Ltd | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184104 | pCR 28.532 Add component types for provisioning service for sub-networks |
pCR revised to S5-184249 |
Intel Corporation (UK) Ltd | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184105 | TS 28.510 scope extension | CR | Intel K.K. | 28.51 14.2.0 CR#4 catB | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
withdrawn | [WTS] [JSN] |
S5-184106 | TS 28.511 scope extension | CR | Intel K.K. | 28.511 14.1.0 CR#3 catB | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
withdrawn | [WTS] [JSN] |
S5-184107 | TS 28.525 scope extension | CR | Intel K.K. | 28.525 14.2.0 CR#18 catB | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
withdrawn | [WTS] [JSN] |
S5-184108 | TS 28.526 scope extension | CR | Intel K.K. | 28.526 14.1.0 CR#11 catB | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
withdrawn | [WTS] [JSN] |
S5-184109 | NRM enhancement to support NFV | CR | Intel K.K. | 28.622 15.0.0 CR#25 catB | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
withdrawn | [WTS] [JSN] |
S5-184110 | pCR 28.500 add the relationship between NE and PNF |
other revised to S5-184308 |
Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
revised | [WTS] [JSN] | |
S5-184111 | pCR 28.500 add Relation between 5G management and NFV-MA | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
noted | [WTS] [JSN] | |
S5-184112 | Rel-15 pCR TS 32.255 Update Triggers description |
pCR revised to S5-184200 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184113 | Rel-15 pCR TS 32.255 Update CDR generation description |
pCR revised to S5-184215 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184114 | Rel-15 pCR TS 32.255 Introduce Charging characteristics |
pCR revised to S5-184216 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184115 | Discussion paper on usage reporting | discussion | Nokia, Nokia Shanghai Bell | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
noted | [WTS] [JSN] | |
S5-184116 | Rel-15 pCR TS 32.255 Update Message description for usage | pCR | Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
merged | [WTS] [JSN] |
S5-184117 | Rel-15 pCR TS 32.255 Update PDU session flows | pCR | Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
merged | [WTS] [JSN] |
S5-184118 | Rel-15 pCR TS 32.255 Introduce non-3GPP access |
pCR revised to S5-184214 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184119 | Add high-level use case of network slice capacity management |
pCR revised to S5-184122, S5-184233 |
ETRI | 28.53 0.7.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184120 | pCR 28.531 Add use case and requirements for capacity planning of network slice management capability |
pCR revised to S5-184250 |
ETRI | 28.531 0.5.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184121 | Add a procedure of network slice capacity management |
pCR revised to S5-184251 |
ETRI | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184122 | Add high-level use case of network slice capacity management |
pCR revision of S5-184119 |
ETRI | 28.53 0.7.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
withdrawn | [WTS] [JSN] |
S5-184123 | Rel-15 pCR TS 32.255 Update CDR description for usage |
pCR revised to S5-184217 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184124 | Rel-15 pCR TS 32.255 Edithelp Clean-up | pCR | Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184125 | Rel-15 pCR TS 32.291 Udpate for template alignement | pCR | Nokia, Nokia Shanghai Bell | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
noted | [WTS] [JSN] |
S5-184126 | Rel-15 pCR TS 32.291 Use of Feature negociation | pCR | Nokia, Nokia Shanghai Bell | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] |
S5-184127 | Rel-15 draftCR TS 32.290 Update Message Content for usage reporting |
draftCR revised to S5-184288 |
Nokia, Nokia Shanghai Bell | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184128 | Rel-15 draftCR TS 32.290 Update combined scenarios |
draftCR revised to S5-184220 |
Nokia, Nokia Shanghai Bell | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184129 | pCR 28.545 add use cases about notify changed alarm |
pCR revised to S5-184267 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184130 | pCR 28.545 add use cases about notify cleared alarm |
pCR revised to S5-184268 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184131 | pCR 28.545 add use cases about notify acknowledgement state change |
pCR revised to S5-184269 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184132 | pCR 28.545 add service names |
pCR revised to S5-184265 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184133 | pCR 28.545 Change the service names in the use cases and requirements |
pCR revised to S5-184266 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184134 | pCR 28.546 update the service names | pCR | ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
merged | [WTS] [JSN] |
S5-184135 | pCR 28.546 Remove annex and duplicated reference | pCR | ZTE, China Mobile | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184136 | pCR 28.546 skeleton of stage3 | pCR | ZTE, China Mobile | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
noted | [WTS] [JSN] |
S5-184137 | pCR 28.546 Add RESTful Solution of subscribe operation |
pCR revised to S5-184331 |
ZTE, China Mobile | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184138 | Discussion paper on service registration and discovery | discussion | Nokia, Nokia Shanghai Bell | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
noted | [WTS] [JSN] | |
S5-184139 | Rel-15 pCR TS 32.291 Introduce OpenAPI Annex | pCR | Nokia, Nokia Shanghai Bell | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] |
S5-184140 | Rel-15 pCR TS 32.255 Introduce Network sharing (MOCN). | pCR | Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
noted | [WTS] [JSN] |
S5-184141 | Rel-15 pCR 32.255 Proposal on requirement clarifications |
pCR revised to S5-184208 |
Ericsson | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184142 | Rel-15 pCR 32.255 Roaming handling clarification |
pCR revised to S5-184211 |
Ericsson | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184143 | Rel-15 pCR 32.255 Change to table format for trigger conditions |
pCR revised to S5-184201 |
Ericsson | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184144 | Rel-15 pCR 32.255 New flow for PDU session modification |
pCR revised to S5-184213 |
Ericsson | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184145 | Rel-15 pCR 32.255 Addition of rating output in CDR |
pCR revised to S5-184218 |
Ericsson | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
revised | [WTS] [JSN] |
S5-184146 | Rel-15 draftCR 32.290 Update of description of flows |
draftCR revised to S5-184221 |
Ericsson | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184147 | Rel-15 draftCR 32.290 Update of service description |
draftCR revised to S5-184226 |
Ericsson | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184148 | Rel-15 draftCR 32.290 Adding flow for Notify |
draftCR revised to S5-184224 |
Ericsson | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184149 | Rel-15 draftCR 32.290 Adding deferred used quota in message content |
draftCR revised to S5-184289 |
Ericsson | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] | |
S5-184150 | Rel-15 pCR 32.291 Update of Service Definition |
pCR revised to S5-184293 |
Ericsson | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] |
S5-184151 | Rel-15 pCR 32.291 Service API Introduction proposal |
pCR revised to S5-184295 |
Ericsson | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
revised | [WTS] [JSN] |
S5-184152 | Rel-15 pCR 32.291 Addition to Usage of HTTP | pCR | Ericsson | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] |
S5-184153 | pCR 28.552 Add measurement for UE Context Rel initiated by CU and revise the associated UC |
pCR revised to S5-184281 |
China Mobile E-Commerce Co. | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184154 | pCR 28.552 Add measurement on the processor usage of virtualized gNB-CU | pCR | China Mobile E-Commerce Co. | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
noted | [WTS] [JSN] |
S5-184155 | pCR 28.554 Add a new use case of registration success rate |
pCR revised to S5-184284 |
China Mobile E-Commerce Co. | 28.554 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184156 | pCR 28.554 Add a KPI definition of registration success rate |
pCR revised to S5-184285 |
China Mobile E-Commerce Co. | 28.554 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184157 | pCR 32.158 Clarify resource URI structure |
pCR revised to S5-184310 |
Nokia Germany | 32.158 1.0.0 | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
revised | [WTS] [JSN] |
S5-184158 | pCR 32.158 Clarify design pattern for reading a resource | pCR | Nokia Germany | 32.158 1.0.0 | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
approved | [WTS] [JSN] |
S5-184159 | pCR 32.158 Clarify design pattern for updating a resource |
pCR revised to S5-184311 |
Nokia Germany | 32.158 1.0.0 | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
revised | [WTS] [JSN] |
S5-184160 | pCR 32.158 Add design pattern for partially updating a resource |
pCR revised to S5-184312 |
Nokia Germany | 32.158 1.0.0 | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
revised | [WTS] [JSN] |
S5-184161 | pCR 32.158 Add resource representation formats |
pCR revised to S5-184313 |
Nokia Germany | 32.158 1.0.0 | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
revised | [WTS] [JSN] |
S5-184162 | pCR 28.546 Add stage 3 definitions |
pCR revised to S5-184235 |
Nokia Germany | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184163 | pCR 28.553 PDU session measurements clarifications | pCR | Ericsson GmbH, Eurolab | 28.553 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184164 | pCR 28.554 PDU session KPI and UC update | pCR | Ericsson GmbH, Eurolab | 28.554 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184165 | pCR 28.552 Add Use Case and Measurements related to UE throughput |
pCR revised to S5-184335 |
Ericsson GmbH, Eurolab | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184166 | pCR 28.552 Add Use Case and Measurements related to Unrestricted Volume |
pCR revised to S5-184336 |
Ericsson GmbH, Eurolab | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184167 | pCR 28.554 Add KPI and UC related to UE throughput in RAN |
pCR revised to S5-184340 |
Ericsson GmbH, Eurolab | 28.554 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184168 | Discussion paper on relation between 3GPP NRMs and ETSI ISG NFV entities | discussion | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
noted | [WTS] [JSN] | |
S5-184169 | LS on L2 measurement specification for NR in R15 |
LS out source LS: S5-182574 LS To: 3GPP RAN2, 3GPP RAN3 revised to S5-184337 |
Ericsson GmbH, Eurolab | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] | ||
S5-184170 | Discussion paper on restructuring of TS 28.552 clause 5 | discussion | Ericsson GmbH, Eurolab | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
endorsed | [WTS] [JSN] | ||
S5-184171 | pCR 28.552 Add measurements related to non-split scenario | pCR | Ericsson GmbH, Eurolab | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
withdrawn | [WTS] [JSN] |
S5-184172 | pCR 28.531 Minor update | pCR | Ericsson Limited | 28.531 1.0.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184173 | pCR 28.533 Update title |
pCR revised to S5-184322 |
Ericsson Limited | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184174 | pCR 28.532 State handling of NSI |
pCR revised to S5-184325 |
Ericsson Limited | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184175 | Update TS 32.101 to include management services description | discussion | Ericsson Limited |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] | |||
S5-184176 | Update the scope of TS 32.103 | discussion | Ericsson Limited |
S5-ah-33662 AI: 4.2.1 |
endorsed | [WTS] [JSN] | |||
S5-184177 | Discussion paper on Management reference model |
discussion revised to S5-184341 |
Ericsson Limited |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] | |||
S5-184178 | Rel-15 DraftCR 28.659 Update E-UTRAN SS definitions to support EN-DC management | draftCR | Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] | |
S5-184179 | Rel-15 DraftCR 28.657 Add requirement to support ng-eNB management |
draftCR revised to S5-184262 |
Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] | |
S5-184180 | Rel-15 DraftCR 28.658 Update E-UTRAN IS definitions to support ng-eNB management |
draftCR revised to S5-184263 |
Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] | |
S5-184181 | Rel-15 DraftCR 28.709 Update EPC SS definitions to support management of EN-DC and 5G interworking | draftCR | Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] | |
S5-184182 | LS from BBF to SA5 on Cooperation on Network Slicing | LS in | BBF |
S5-ah-33662 AI: 4.1 |
noted | [WTS] [JSN] | |||
S5-184183 | LS from IETF to SA5 on IETF work related to the management and orchestration of network slicing |
LS in LS reply in S5-184272 |
IETF |
S5-ah-33662 AI: 4.1 |
replied to | [WTS] [JSN] | |||
S5-184184 | LS from ITU-T SG15 to SA5 on transport network management to support 3GPP 5G (reply to 3GPP TSG SA5 – ols12-182369) | LS in | ITU-T SG15 |
S5-ah-33662 AI: 4.1 |
noted | [WTS] [JSN] | |||
S5-184185 | LS from CT3 to SA5 on Addition of AVP code definitions | LS in | C3-183701 |
S5-ah-33662 AI: 5.1 |
withdrawn | [WTS] [JSN] | |||
S5-184186 | LS from CT3 cc SA5 on clarification for spending limit control functionality | LS in | C3-183783 |
S5-ah-33662 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-184187 | LS from GSMA to SA5 on Publication of new paper on network slicing and future plans | LS in | GSMA NEST |
S5-ah-33662 AI: 4.1 |
withdrawn | [WTS] [JSN] | |||
S5-184188 | Reply LS from RAN2 to SA5 on Bluetooth/WLAN measurement collection in MDT | LS in | R2-1808793 |
S5-ah-33662 AI: 4.1 |
postponed | [WTS] [JSN] | |||
S5-184189 | Reply LS from RAN2 to SA5 on adding measurements on average number of total active UEs | LS in | R2-1809158 |
S5-ah-33662 AI: 4.1 |
withdrawn | [WTS] [JSN] | |||
S5-184190 | LS from RAN2 cc SA5 on RAN2 progress on ANR | LS in | R2-1809226 |
S5-ah-33662 AI: 4.1 |
noted | [WTS] [JSN] | |||
S5-184191 | Reply LS from RAN3 cc SA5 on adding new service type in QMC reporting | LS in | R3-183320 |
S5-ah-33662 AI: 4.1 |
withdrawn | [WTS] [JSN] | |||
S5-184192 | LS from SA2 cc SA5 on QoS Prediction | LS in | S2-185846 |
S5-ah-33662 AI: 4.1 |
withdrawn | [WTS] [JSN] | |||
S5-184193 | LS from SA2 cc SA5 on 5G GUTI and EPS Interworking | LS in | S2-186176 |
S5-ah-33662 AI: 4.1 |
withdrawn | [WTS] [JSN] | |||
S5-184194 | Resubmitted LS from SA4 to SA5 on Attributes for QoE measurement collection | LS in | S4-180240 |
S5-ah-33662 AI: 4.1 |
withdrawn | [WTS] [JSN] | |||
S5-184195 | Sequence proposal for management and orchestration of 5G networks and network slicing agenda point 4.2.1 |
other revised to S5-184238 |
Ericsson Limited |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] | |||
S5-184196 | Tdoc discussion sequence for WI on Assurance data and PM for 5G networks and network slicing | other | Intel Corporation (UK) Ltd | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
withdrawn | [WTS] [JSN] | ||
S5-184197 | Discussion paper on reduction of number of TS for 5G management | discussion | Ericsson Limited |
S5-ah-33662 AI: 4.1 |
merged | [WTS] [JSN] | |||
S5-184198 | Rel-15 pCR 32.255 Proposal on the Triggers |
pCR revision of S5-184035 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184199 | Rel-15 pCR 32.255 Proposal on the Trigger Configuration |
pCR revision of S5-184034 |
Huawei Technologies Co. Ltd.,Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184200 | Rel-15 pCR TS 32.255 Update Triggers description |
pCR revision of S5-184112 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184201 | Rel-15 pCR 32.255 Change to table format for trigger conditions |
pCR revision of S5-184143 |
Ericsson,Huawei Technologies Co. Ltd., Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184202 | Rel-15 pCR 32.255 Proposal on PCC Rules for Converged Charging |
pCR revision of S5-184029 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184203 | Rel-15 draftCR 32.290 ConvergedCharging service definition update | draftCR | Openet | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] | |
S5-184204 | LS to SA2 Introduction of a new charging method for PCC Rule. |
LS out LS To: SA2 |
Huawei Technologies Co. Ltd. |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] | |||
S5-184205 | Rel-15 pCR 32.255 Proposal on the Message Content |
pCR revision of S5-184032 |
Huawei Technologies Co. Ltd.,Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184206 | Rel-15 pCR 32.255 Proposal for the Charging Session |
pCR revision of S5-184028 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184207 | Rel-15 draftCR 32.290 Charging Session definition | draftCR | Huawei Technologies Co. Ltd. | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] | |
S5-184208 | Rel-15 pCR 32.255 Proposal on requirement clarifications |
pCR revision of S5-184141 |
Ericsson | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184209 | Rel-15 pCR 32.255 Correction on the mesage flow for PDU Session establishment |
pCR revision of S5-184025 |
Huawei Technologies Co. Ltd.,Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184210 | Rel-15 pCR 32.255 Proposal on the Roaming Requirement |
pCR revision of S5-184033 |
Huawei Technologies Co. Ltd. | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184211 | Rel-15 pCR 32.255 Roaming handling clarification |
pCR revision of S5-184142 |
Ericsson | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184212 | Rel-15 draftCR 32.290 Introduce container concept | draftCR | Nokia, Nokia Shanghai Bell | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] | |
S5-184213 | Rel-15 pCR 32.255 New flow for PDU session modification |
pCR revision of S5-184144 |
Ericsson | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184214 | Rel-15 pCR TS 32.255 Introduce non-3GPP access |
pCR revision of S5-184118 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184215 | Rel-15 pCR TS 32.255 Update CDR generation description |
pCR revision of S5-184113 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184216 | Rel-15 pCR TS 32.255 Introduce Charging characteristics |
pCR revision of S5-184114 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184217 | Rel-15 pCR TS 32.255 Update CDR description for usage |
pCR revision of S5-184123 |
Nokia, Nokia Shanghai Bell | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184218 | Rel-15 pCR 32.255 Addition of rating output in CDR |
pCR revision of S5-184145 |
Ericsson | 32.255 1.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] |
S5-184219 | Rel-15 draftCR 32.290 Correction on the Converged Charging Scenarios |
draftCR revision of S5-184036 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184220 | Rel-15 draftCR TS 32.290 Update combined scenarios |
draftCR revision of S5-184128 |
Nokia, Nokia Shanghai Bell | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184221 | Rel-15 draftCR 32.290 Update of description of flows |
draftCR revision of S5-184146 |
Ericsson | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184222 | Rel-15 draftCR 32.290 Proposal on CTF in 5G Charging |
draftCR revision of S5-184039 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184223 | Rel-15 pCR 32.290 Proposal on the Requirement for Converged Charging |
draftCR revision of S5-184043 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184224 | Rel-15 draftCR 32.290 Adding flow for Notify |
draftCR revision of S5-184148 |
Ericsson | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184225 | Rel-15 draftCR 32.290 Proposal on Charging Service Operation |
draftCR revision of S5-184038 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184226 | Rel-15 draftCR 32.290 Update of service description |
draftCR revision of S5-184147 |
Ericsson | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184227 | Rel-15 draftCR 32.290 Proposal on Nchf_ConvergedCharging_Notify service operation |
draftCR revision of S5-184041 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184228 | Rel-15 pCR 32.290 Proposal on Message Content |
draftCR revision of S5-184040 |
Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184229 | Discussion Sequence Proposal for 4.2.4 | other | ZTE |
S5-ah-33662 AI: 4.2.4 |
noted | [WTS] [JSN] | |||
S5-184230 | Time Plan for OAM&P |
other revision of S5-184002 |
WG Vice Chair (Huawei) |
S5-ah-33662 AI: 4.1 |
noted | [WTS] [JSN] | |||
S5-184231 | pCR 28.530 Rapporteur clean-up proposal on editor notes |
pCR revision of S5-184062 |
Huawei | 28.53 1.0.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184232 | pCR 28.530 Rapporteur clean-up proposal on alignment of SBMA |
pCR revision of S5-184063 |
Huawei | 28.53 1.0.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184233 | Add high-level use case of network slice capacity management |
pCR revision of S5-184119 revised to S5-184367 |
ETRI | 28.53 0.7.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184234 | OAM executive report | report | WG Vice Chair (Huawei) |
S5-ah-33662 AI: 4.1 |
reserved | [WTS] [JSN] | |||
S5-184235 | pCR 28.546 Add stage 3 definitions |
pCR revision of S5-184162 revised to S5-184333 |
Nokia Germany | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184236 | pCR 28.533 Solutions for management of 5G network and network slicing |
pCR revision of S5-184069 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184237 | pCR 28.530 Add UC for network management data analysis |
pCR revision of S5-184064 revised to S5-184343 |
Huawei | 28.53 1.0.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184238 | Sequence proposal for management and orchestration of 5G networks and network slicing agenda point 4.2.1 |
other revision of S5-184195 |
Ericsson Limited |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] | |||
S5-184239 | pCR 28.531 Rapporteur clean-up proposal |
pCR revision of S5-184076 |
Huawei | 28.531 1.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184240 | Draft TS 28.532 | draft TS | Huawei | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] | |
S5-184241 | Draft TS 28.531 | draft TS | Huawei | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] | |
S5-184242 | pCR 28.532 Clean-up network slice related procedures |
pCR revision of S5-184080 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184243 | pCR 28.532 Clean-up network slice subnet and NF related procedures |
pCR revision of S5-184081 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184244 | pCR 28.532 Add RESTful solution for createMOI operation |
pCR revision of S5-184082 revised to S5-184359 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184245 | pCR 28.532 Add RESTful solution for getMOIAttributes operation |
pCR revision of S5-184083 revised to S5-184347 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184246 | pCR 28.532 Add RESTful solution for modifyMOIAttributes operation |
pCR revision of S5-184084 revised to S5-184348 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184247 | pCR 28.532 Add RESTful solution for deleteMOI operation |
pCR revision of S5-184085 revised to S5-184349 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184248 | pCR 28.532 Update on the information model parameter perfReq |
pCR revision of S5-184086 revised to S5-184350 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184249 | pCR 28.532 Add component types for provisioning service for sub-networks |
pCR revision of S5-184104 revised to S5-184351 |
Intel Corporation (UK) Ltd | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184250 | pCR 28.531 Add use case and requirements for capacity planning of network slice management capability |
pCR revision of S5-184120 revised to S5-184352 |
ETRI | 28.531 0.5.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184251 | Add a procedure of network slice capacity management |
pCR revision of S5-184121 |
ETRI | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184252 | pCR draft TS 28540 add Requirement | pCR | Ericsson Inc. | 28.54 0.3.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
withdrawn | [WTS] [JSN] |
S5-184253 | pCR draft TS 28541 merge model of gNB with en-gNB |
pCR revision of S5-184022 |
Ericsson Inc. | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184254 | pCR draft TS 28541 implement Endorsement S5-183625 |
pCR revision of S5-184018 |
Ericsson Inc. | 28.541 0.3.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184255 | pCR draft TS 28541 use of one model Requirement |
pCR revision of S5-184019 |
Ericsson Inc. | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184256 | pCR draft TS 28541 gNB cell state handling |
pCR revision of S5-184021 revised to S5-184353 |
Ericsson Inc. | 28.541 0.3.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184257 | pCR draft TS 28541 BWP config |
pCR revision of S5-184023 |
Ericsson Inc. | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184258 | Draft TS 28.541 | draft TS | Nokia | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
reserved | [WTS] [JSN] | |
S5-184259 | Draft TS 28.543 | draft TS | Nokia | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
withdrawn | [WTS] [JSN] | |
S5-184260 | pCR 28.543 Add eEP_RP IOC and update existing EP_RP(s) |
pCR revision of S5-184095 |
Huawei | 28.543 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184261 | pCR TS 28.543 Update NRF and NSSF transport view diagram with interfaces for international roaming |
pCR revision of S5-184051 |
Nokia, Nokia Shanghai Bell | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184262 | Rel-15 DraftCR 28.657 Add requirement to support ng-eNB management |
draftCR revision of S5-184179 |
Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] | |
S5-184263 | Rel-15 DraftCR 28.658 Update E-UTRAN IS definitions to support ng-eNB management |
draftCR revision of S5-184180 |
Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] | |
S5-184264 | pCR 28.545 Update FS management services | pCR | Huawei | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
withdrawn | [WTS] [JSN] |
S5-184265 | pCR 28.545 add service names |
pCR revision of S5-184132 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184266 | pCR 28.545 Change the service names in the use cases and requirements |
pCR revision of S5-184133 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184267 | pCR 28.545 add use cases about notify changed alarm |
pCR revision of S5-184129 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184268 | pCR 28.545 add use cases about notify cleared alarm |
pCR revision of S5-184130 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184269 | pCR 28.545 add use cases about notify acknowledgement state change |
pCR revision of S5-184131 |
ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184270 | pCR 28.546 Update FS management services |
pCR revision of S5-184098 revised to S5-184354 |
Huawei | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184271 | Discussion paper re-organization of 5G management specifications |
discussion revision of S5-184061 revised to S5-184365 |
Huawei,Ericsson | Rel-15 |
S5-ah-33662 AI: 4.1 |
revised | [WTS] [JSN] | ||
S5-184272 | Reply to: LS from IETF to SA5 on IETF work related to the management and orchestration of network slicing |
LS out LS is reply to S5-184183 LS To: IETF |
Huawei |
S5-ah-33662 AI: 4.1 |
approved | [WTS] [JSN] | |||
S5-184273 | pCR 28.546 update the service names | pCR | ZTE, China Mobile | 28.545 0.3.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
withdrawn | [WTS] [JSN] |
S5-184274 | pCR 28.546 Procedures for subscribeAlarmNotify R4 |
pCR revision of S5-184096 revised to S5-184357 |
Huawei | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184275 | pCR 28.546 VR alarm correlation R4 |
pCR revision of S5-184097 revised to S5-184358 |
Huawei | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184276 | pCR 28.550 Update UC and requirements on management data analytics |
pCR revision of S5-184088 |
Intel Corporation (UK) Ltd | 28.55 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
noted | [WTS] [JSN] |
S5-184277 | pCR 28.550 Add UC and requirement for management analytics KPIs for networks |
pCR revision of S5-184102 |
Huawei | 28.55 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184278 | Discussion paper on KPI collection and reporting |
discussion revision of S5-184092 |
Intel Corporation (UK) Ltd | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
noted | [WTS] [JSN] | ||
S5-184279 | pCR 28.551 Add component types for measurement job management services |
pCR revision of S5-184089 revised to S5-184361 |
Intel Corporation (UK) Ltd | 28.551 0.2.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184280 | pCR 28.551 Add component types for performance data file reporting services |
pCR revision of S5-184090 revised to S5-184362 |
Intel Corporation (UK) Ltd | 28.551 0.2.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184281 | pCR 28.552 Add measurement for UE Context Rel initiated by CU and revise the associated UC |
pCR revision of S5-184153 revised to S5-184363 |
China Mobile E-Commerce Co. | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
revised | [WTS] [JSN] |
S5-184282 | Draft TS 28.552 | draft TS | Intel | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
reserved | [WTS] [JSN] | |
S5-184283 | Draft TS 28.553 | draft TS | Intel | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
reserved | [WTS] [JSN] | |
S5-184284 | pCR 28.554 Add a new use case of registration success rate |
pCR revision of S5-184155 |
China Mobile E-Commerce Co. | 28.554 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184285 | pCR 28.554 Add a KPI definition of registration success rate |
pCR revision of S5-184156 |
China Mobile E-Commerce Co. | 28.554 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184286 | Draft CR rel-15 28.622 Update EP-RP IOC definition to support 5G NRM | draftCR | Huawei | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
withdrawn | [WTS] [JSN] | |
S5-184287 | pCR 28.532 Update on network slice information model |
pCR revision of S5-184079 revised to S5-184346 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184288 | Rel-15 draftCR TS 32.290 Update Message Content for usage reporting |
draftCR revision of S5-184127 |
Nokia, Nokia Shanghai Bell | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184289 | Rel-15 draftCR 32.290 Adding deferred used quota in message content |
draftCR revision of S5-184149 |
Ericsson | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |
S5-184290 | LS to SA2 Use of NRF framework by CHF for information |
LS out LS To: SA2 |
Nokia, Nokia Shanghai Bell |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |||
S5-184291 | Rel-15 pCR 32.291 Proposal on Nchf_ ConvergedCharging Service APIs |
pCR revision of S5-184046 |
Huawei Technologies Co. Ltd. | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] |
S5-184292 | Rel-15 pCR 32.291 Proposal on Service Definition |
pCR revision of S5-184047 |
Huawei Technologies Co. Ltd. | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] |
S5-184293 | Rel-15 pCR 32.291 Update of Service Definition |
pCR revision of S5-184150 |
Ericsson | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] |
S5-184294 | Rel-15 pCR 32.291 Proposal on Message Flow of the Service Operation |
pCR revision of S5-184045 |
Huawei Technologies Co. Ltd. | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] |
S5-184295 | Rel-15 pCR 32.291 Service API Introduction proposal |
pCR revision of S5-184151 |
Ericsson | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] |
S5-184296 | Rel-15 pCR 32.291 Proposal on Data Model |
pCR revision of S5-184044 |
Huawei Technologies Co. Ltd. | 32.291 0.3.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
noted | [WTS] [JSN] |
S5-184297 | Status of email approvals | other | WG Vice Chair (ORANGE) |
S5-ah-33662 AI: 6 |
reserved | [WTS] [JSN] | |||
S5-184298 | LS to CT4 on template availability in TS 29.501 |
LS out LS To: CT4 |
Nokia, Nokia Shanghai Bell |
S5-ah-33662 AI: 5.2.2 |
approved | [WTS] [JSN] | |||
S5-184299 | Draft TS 32.255 | draft TS | Nokia, Nokia Shanghai Bell | 5GS_Ph1-DCH | Rel-15 |
S5-ah-33662 AI: 5.2.1 |
approved | [WTS] [JSN] | |
S5-184300 | Draft TS 32.291 | draft TS | Huawei Technologies Co. Ltd. | 5GS_Ph1-SBI_CH | Rel-15 |
S5-ah-33662 AI: 5.2.2 |
reserved | [WTS] [JSN] | |
S5-184301 | CH Executive Report | report | CH SWG Chair |
S5-ah-33662 AI: 5.1 |
available | [WTS] [JSN] | |||
S5-184302 | Draft TS 28.540 | draft TS | Nokia | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
reserved | [WTS] [JSN] | |
S5-184308 | DraftCR 28.500 add the relationship between NE and PNF |
draftCR revision of S5-184110 |
Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
noted | [WTS] [JSN] | |
S5-184309 | pCR 28.500 add Relation between 5G management and NFV-MA | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-ah-33662 AI: 4.2.7 |
withdrawn | [WTS] [JSN] | |
S5-184310 | pCR 32.158 Clarify resource URI structure |
pCR revision of S5-184157 |
Nokia Germany | 32.158 1.0.0 | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
noted | [WTS] [JSN] |
S5-184311 | pCR 32.158 Clarify design pattern for updating a resource |
pCR revision of S5-184159 |
Nokia Germany | 32.158 1.0.0 | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
approved | [WTS] [JSN] |
S5-184312 | pCR 32.158 Add design pattern for partially updating a resource |
pCR revision of S5-184160 |
Nokia Germany | 32.158 1.0.0 | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
approved | [WTS] [JSN] |
S5-184313 | pCR 32.158 Add resource representation formats |
pCR revision of S5-184161 |
Nokia Germany | 32.158 1.0.0 | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
approved | [WTS] [JSN] |
S5-184314 | pCR 28.533 add DAMF deployment scenario |
pCR revision of S5-184071 revised to S5-184344 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184315 | pCR 28.533 Management service unique identifier |
pCR revision of S5-184075 revised to S5-184366 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184316 | pCR 28.533 Exposure governance precondition |
pCR revision of S5-184072 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184317 | pCR 28.533 Exposure governance clarification |
pCR revision of S5-184073 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184318 | Draft TS 28.533 | draft TS | Ericsson | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] | |
S5-184319 | pCR 28.533 Add deployment model for management of network and network slice |
pCR revision of S5-184068 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184320 | pCR 28.533 Update functional management architecture to include MDAF |
pCR revision of S5-184103 revised to S5-184345 |
Intel Corporation (UK) Ltd | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184321 | Update TS 32.101 to include management services description | discussion | Ericsson Limited |
S5-ah-33662 AI: 4.2.1 |
withdrawn | [WTS] [JSN] | |||
S5-184322 | pCR 28.533 Update title |
pCR revision of S5-184173 |
Ericsson Limited | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184323 | pCR 28.550 Global alignment of management service names |
pCR revision of S5-184087 |
Intel Corporation (UK) Ltd | 28.55 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184324 | pCR 28.541 | pCR | Ericsson | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
withdrawn | [WTS] [JSN] |
S5-184325 | pCR 28.532 State handling of NSI |
pCR revision of S5-184174 |
Ericsson Limited | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184326 | pCR 28.540 Merge current 5GNRM specifications into one single specification |
pCR revision of S5-184048 |
Nokia, Nokia Shanghai Bell | 28.54 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184327 | pCR 28.541 Merge current 5GNRM Stage 2&3 specifications into one single specification |
pCR revised to S5-184356 |
Nokia | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] |
S5-184328 | Revised WID Network Resource Model (NRM) for 5G networks and network slicing |
WID revised revision of S5-184059 revised to S5-184355 |
Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
revised | [WTS] [JSN] | |
S5-184329 | Merge of 28531 and 28532 | other | Huawei |
S5-ah-33662 AI: 4.2.1 |
noted | [WTS] [JSN] | |||
S5-184330 | New generic management service spec | other | Huawei |
S5-ah-33662 AI: 4.2.1 |
endorsed | [WTS] [JSN] | |||
S5-184331 | pCR 28.546 Add RESTful Solution of subscribe operation |
pCR revision of S5-184137 |
ZTE, China Mobile | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184332 | Draft TS 28.546 | draft TS | Nokia | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] | |
S5-184333 | pCR 28.546 Add stage 3 definitions |
pCR revision of S5-184235 |
Nokia Germany | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184334 | pCR 28.551 Add procedures for Network Slice Subnet Data Analytics |
pCR revision of S5-184101 |
Huawei | 28.551 0.2.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
noted | [WTS] [JSN] |
S5-184335 | pCR 28.552 Add Use Case and Measurements related to UE throughput |
pCR revision of S5-184165 |
Ericsson GmbH, Eurolab | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184336 | pCR 28.552 Add Use Case and Measurements related to Unrestricted Volume |
pCR revision of S5-184166 |
Ericsson GmbH, Eurolab | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184337 | LS on L2 measurement specification for NR in R15 |
LS out source LS: S5-182574 LS To: 3GPP RAN2, 3GPP RAN3 revision of S5-184169 |
Ericsson GmbH, Eurolab | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] | ||
S5-184338 | Draft TS 28.545 | draft TS | ZTE | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] | |
S5-184339 | Draft TS 28.554 | draft TS | China Mobile | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
reserved | [WTS] [JSN] | |
S5-184340 | pCR 28.554 Add KPI and UC related to UE throughput in RAN |
pCR revision of S5-184167 |
Ericsson GmbH, Eurolab | 28.554 1.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184341 | Discussion paper on Management reference model |
discussion revision of S5-184177 |
Ericsson Limited |
S5-ah-33662 AI: 4.2.1 |
endorsed | [WTS] [JSN] | |||
S5-184342 | Draft TS 28.530 | draft TS | Huawei | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] | |
S5-184343 | pCR 28.530 Add UC for network management data analysis |
pCR revision of S5-184237 |
Huawei | 28.53 1.0.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184344 | pCR 28.533 add DAMF deployment scenario |
pCR revision of S5-184314 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184345 | pCR 28.533 Update functional management architecture to include MDAF |
pCR revision of S5-184320 |
Intel Corporation (UK) Ltd | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184346 | pCR 28.532 Update on network slice information model |
pCR revision of S5-184287 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184347 | pCR 28.532 Add RESTful solution for getMOIAttributes operation |
pCR revision of S5-184245 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184348 | pCR 28.532 Add RESTful solution for modifyMOIAttributes operation |
pCR revision of S5-184246 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184349 | pCR 28.532 Add RESTful solution for deleteMOI operation |
pCR revision of S5-184247 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184350 | pCR 28.532 Update on the information model parameter perfReq |
pCR revision of S5-184248 revised to S5-184368 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184351 | pCR 28.532 Add component types for provisioning service for sub-networks |
pCR revision of S5-184249 revised to S5-184369 |
Intel Corporation (UK) Ltd | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
revised | [WTS] [JSN] |
S5-184352 | pCR 28.531 Add use case and requirements for capacity planning of network slice management capability |
pCR revision of S5-184250 |
ETRI | 28.531 0.5.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184353 | pCR draft TS 28541 gNB cell state handling |
pCR revision of S5-184256 |
Ericsson Inc. | 28.541 0.3.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184354 | pCR 28.546 Update FS management services |
pCR revision of S5-184270 |
Huawei,ZTE | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184355 | Revised WID Network Resource Model (NRM) for 5G networks and network slicing |
WID revised revision of S5-184328 |
Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
agreed | [WTS] [JSN] | |
S5-184356 | pCR 28.541 Merge current 5GNRM Stage 2&3 specifications into one single specification |
pCR revision of S5-184327 |
Nokia | 28.541 1.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-ah-33662 AI: 4.2.3 |
approved | [WTS] [JSN] |
S5-184357 | pCR 28.546 Procedures for subscribeAlarmNotify R4 |
pCR revision of S5-184274 revised to S5-184370 |
Huawei | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
revised | [WTS] [JSN] |
S5-184358 | pCR 28.546 VR alarm correlation R4 |
pCR revision of S5-184275 |
Huawei | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
approved | [WTS] [JSN] |
S5-184359 | pCR 28.532 Add RESTful solution for createMOI operation |
pCR revision of S5-184244 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184360 | Draft TS 28.550 | draft TS | Intel | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
reserved | [WTS] [JSN] | |
S5-184361 | pCR 28.551 Add component types for measurement job management services |
pCR revision of S5-184279 |
Intel Corporation (UK) Ltd | 28.551 0.2.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184362 | pCR 28.551 Add component types for performance data file reporting services |
pCR revision of S5-184280 |
Intel Corporation (UK) Ltd | 28.551 0.2.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184363 | pCR 28.552 Add measurement for UE Context Rel initiated by CU and revise the associated UC |
pCR revision of S5-184281 |
China Mobile E-Commerce Co. | 28.552 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
approved | [WTS] [JSN] |
S5-184364 | Draft TS 32.158 | draft TS | Nokia | REST_SS | Rel-15 |
S5-ah-33662 AI: 4.2.8 |
reserved | [WTS] [JSN] | |
S5-184365 | Discussion paper re-organization of 5G management specifications |
discussion revision of S5-184271 |
Huawei,Ericsson | Rel-15 |
S5-ah-33662 AI: 4.1 |
endorsed | [WTS] [JSN] | ||
S5-184366 | pCR 28.533 Management service unique identifier |
pCR revision of S5-184315 revised to S5-184374 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
revised | [WTS] [JSN] |
S5-184367 | Add high-level use case of network slice capacity management |
pCR revision of S5-184233 |
ETRI | 28.53 0.7.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
S5-184368 | pCR 28.532 Update on the information model parameter perfReq |
pCR revision of S5-184350 |
Huawei | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184369 | pCR 28.532 Add component types for provisioning service for sub-networks |
pCR revision of S5-184351 |
Intel Corporation (UK) Ltd | 28.532 0.3.0 | NETSLICE-PRO_NS | Rel-15 |
S5-ah-33662 AI: 4.2.2 |
approved | [WTS] [JSN] |
S5-184370 | pCR 28.546 Procedures for subscribeAlarmNotify R4 |
pCR revision of S5-184357 |
Huawei | 28.546 0.2.0 | NETSLICE-FS5G | Rel-15 |
S5-ah-33662 AI: 4.2.4 |
noted | [WTS] [JSN] |
S5-184371 | Minutes of Fault Supervision for 5G networks and network slicing |
report revision of S5-184008 |
Rapporteur (ZTE) |
S5-ah-33662 AI: 4.2.4 |
noted | [WTS] [JSN] | |||
S5-184372 | Draft TS 28.551 | draft TS | Intel | NETSLICE-ADPM5G | Rel-15 |
S5-ah-33662 AI: 4.2.5 |
reserved | [WTS] [JSN] | |
S5-184373 | Minutes of Management and virtualization aspects of 5G networks |
report revision of S5-184011 |
Rapporteur Intel) |
S5-ah-33662 AI: 4.2.7 |
noted | [WTS] [JSN] | |||
S5-184374 | pCR 28.533 Management service unique identifier |
pCR revision of S5-184366 |
Huawei | 28.533 0.3.0 | NETSLICE | Rel-15 |
S5-ah-33662 AI: 4.2.1 |
approved | [WTS] [JSN] |
370 documents (1.1138000488281 seconds)