Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-181000 | Agenda | agenda | WG Chairman |
S5-117 AI: 2 |
approved | [WTS] [JSN] | |||
S5-181001 | IPR and legal declaration | other | WG Chairman |
S5-117 AI: 3 |
noted | [WTS] [JSN] | |||
S5-181002 | Report from last SA5 meeting | report | MCC |
S5-117 AI: 4.1 |
approved | [WTS] [JSN] | |||
S5-181003 | SA5 status report at last SA meeting | report | WG Chairman |
S5-117 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-181004 | SA5 results at last SA meeting | report | WG Chairman |
S5-117 AI: 4.2 |
noted | [WTS] [JSN] | |||
S5-181005 | Leaders meeting agenda | agenda | WG Chairman |
S5-117 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-181006 | Leaders meeting minutes | report | WG Chairman |
S5-117 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-181007 | SA5 Working Procedures | other | WG Vice Chair (Huawei) |
S5-117 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-181008 | SA5 Meeting Facility Requirements | other | WG Vice Chair (Orange) |
S5-117 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-181009 | Process for management of draft TSs/TRs | other | WG Chairman |
S5-117 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-181010 | CR Quality Check | other | MCC |
S5-117 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-181011 | Status of email approvals | other | WG Vice Chair (Orange) |
S5-117 AI: 5.1 |
available | [WTS] [JSN] | |||
S5-181012 | SA5 Meeting Calendar |
other revised to S5-181579 |
WG Chairman |
S5-117 AI: 5.4 |
revised | [WTS] [JSN] | |||
S5-181013 | Deliverables due for the NEXT SA Plenary | other | MCC |
S5-117 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-181014 | Ongoing SA5 WIDs and SIDs | other | WG Vice Chair (Huawei) |
S5-117 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-181015 | SA5 3GPP Work Plan | other | MCC |
S5-117 AI: 5.5 |
noted | [WTS] [JSN] | |||
S5-181016 | Work Plan status | other | WG Chair |
S5-117 AI: 5.5 |
available | [WTS] [JSN] | |||
S5-181017 | Time Plan for OAM&P |
other revised to S5-181301 |
WG Vice Chair (Huawei) |
S5-117 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-181018 | OAM Executive Report |
report revised to S5-181580 |
WG Vice Chair (Huawei) |
S5-117 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-181019 | OAM&P SWG action list |
other revised to S5-181525 |
WG Vice Chair (Huawei) |
S5-117 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-181020 | Minutes of OAM&P SWG opening session | report | WG Vice Chair (Huawei) |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-181021 | Minutes of New Work Item proposals - OAM&P | report | WG Vice Chair (Orange) |
S5-117 AI: 6.2 |
withdrawn | [WTS] [JSN] | |||
S5-181022 | Minutes of OAM&P Maintenance and Rel-15 small Enhancements | report | MCC |
S5-117 AI: 6.3 |
noted | [WTS] [JSN] | |||
S5-181023 | Minutes of Management and orchestration of 5G networks and network slicing | report | Rapporteur (Ericsson) |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] | |||
S5-181024 | Minutes of Provisioning of 5G networks and network slicing | report | Rapporteur (Huawei) |
S5-117 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
S5-181025 | Minutes of Network Resource Model (NRM) for 5G networks and network slicing | report | Rapporteur (Nokia) |
S5-117 AI: 6.4.3 |
noted | [WTS] [JSN] | |||
S5-181026 | Minutes of Fault Supervision for 5G networks and network slicing | report | Rapporteur (ZTE) |
S5-117 AI: 6.4.4 |
noted | [WTS] [JSN] | |||
S5-181027 | Minutes of Assurance data and Performance Management for 5G networks and network slicing | report | Rapporteur (Intel) |
S5-117 AI: 6.4.5 |
noted | [WTS] [JSN] | |||
S5-181028 | Minutes of Management of 5G Trace management | report | Rapporteur(Nokia) |
S5-117 AI: 6.4.6 |
withdrawn | [WTS] [JSN] | |||
S5-181029 | Minutes of Management and virtualization aspects of 5G networks | report | Rapporteur Intel) |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |||
S5-181030 | Minutes of Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | report | Rapporteur (ORANGE) |
S5-117 AI: 6.4.8 |
noted | [WTS] [JSN] | |||
S5-181031 | Minutes for Management of QoE measurement collection | report | Rapporteur (Ericsson) |
S5-117 AI: 6.4.9 |
noted | [WTS] [JSN] | |||
S5-181032 | Minutes for Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management | report | Rapporteur(Nokia) |
S5-117 AI: 6.4. |
withdrawn | [WTS] [JSN] | |||
S5-181033 | Minutes for REST Solution Sets | report | Rapporteur(Nokia) |
S5-117 AI: 6.4.11 |
noted | [WTS] [JSN] | |||
S5-181034 | Minutes for Management Enhancement for EPC CUPS | report | Rapporteur (Huawei) |
S5-117 AI: 6.4.12 |
noted | [WTS] [JSN] | |||
S5-181035 | Minutes for Study on Management aspects of selected IoT-related features | report | Rapporteur (Cisco) |
S5-117 AI: 6.5.1 |
noted | [WTS] [JSN] | |||
S5-181036 | Minutes of study on OAM aspects of LTE and WLAN integration | report | Rapporteur (Intel) |
S5-117 AI: 6.5.2 |
noted | [WTS] [JSN] | |||
S5-181037 | Minutes of Study on network policy management for mobile networks based on NFV scenarios | report | Rapporteur (China Mobile) |
S5-117 AI: 6.5.3 |
noted | [WTS] [JSN] | |||
S5-181038 | Minutes for Study on system and functional aspects of Energy Efficiency in 5G networks | report | Rapporteur (ORANGE) |
S5-117 AI: 6.5.4 |
noted | [WTS] [JSN] | |||
S5-181039 | Minutes of Study on integration of ONAP DCAE and 3GPP management architecture | report | Rapporteur (ORANGE) |
S5-117 AI: 6.5.5 |
noted | [WTS] [JSN] | |||
S5-181040 | CH Agenda and Time Plan | agenda | CH SWG Chair |
S5-117 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-181041 | CH Executive Report |
report revised to S5-181578 |
CH SWG Chair |
S5-117 AI: 7.1 |
revised | [WTS] [JSN] | |||
S5-181042 | LS from NGMN forwarded to SA5 on Architectural Proposal for the Handling of Network Operations Data with Specific Focus on Virtualized Networks | LS in | NGMN |
S5-117 AI: 6.1 |
withdrawn | [WTS] [JSN] | |||
S5-181043 | LS from ETSI ISG ZSM to SA5 on Formation of a new ETSI ISG for Zero Touch Network and Service Management (ZSM) | LS in | ETSI ISG ZSM |
S5-117 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-181044 | LS from NGMN cc SA5 on reply to ETSI ISG NFV on lifecycle management for 3GPP service based architecture | LS in | NGMN |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-181045 | LS from ETSI NFV to SA5 on 3GPP on gaps identified for managing the NG-RAN that includes virtualized network functions | LS in | ETSI ISG NFV |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-181046 | LS from RAN2 to SA5 on supported features by 5GC for E-UTRA connected to 5G CN | LS in | R2-1714203 |
S5-117 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-181047 | LS from RAN3 cc SA5 on Cooperation on Network Slicing | LS in | R3-174874 |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-181048 | LS from SA1 to SA5 on Removal of 'over LTE' limitation from Mission Critical Specifications | LS in | S1-174542 |
S5-117 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-181049 | LS from SA2 to SA5 on Response on 5G Specification of PSy |
LS in LS reply in S5-181452, S5-181452 |
S2-179226 |
S5-117 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-181050 | LS from SA2 cc SA5 on Reply on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic | LS in | S2-179611 |
S5-117 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-181051 | LS from ITU-T SG15 to SA5 on Transport network management to support IMT-2020/5G |
LS in LS reply in S5-181372, S5-181372 |
ITU-T SG15 |
S5-117 AI: 5.3 |
postponed | [WTS] [JSN] | |||
S5-181052 | LS from ITU-T SG5 to SA (forwarded to SA5) on LS/r on Energy Efficiency (reply to 3GPP SA WG - SP-170597 -E) [to 3GPP SA WG] |
LS in LS To: S5-181116 LS reply in S5-181332, S5-181483, S5-181570 |
ITU-TSG5 |
S5-117 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-181053 | pCR 28.304 Edithelp comments and missing keywords | pCR | Orange Romania | 28.304 1.0.0 | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] |
S5-181054 | pCR 28.305 Edithelp comments, merge two operations et al. |
pCR revised to S5-181493 |
Orange Romania | 28.305 1.0.0 | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
revised | [WTS] [JSN] |
S5-181055 | pCR 28.306 Scope and REST solution set for solution 2 |
pCR revised to S5-181495 |
Orange Romania | 28.306 1.0.0 | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
revised | [WTS] [JSN] |
S5-181056 | pCR 28.306 Edithelp comments, missing keywords | pCR | Orange Romania | 28.306 1.0.0 | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] |
S5-181057 | Rel-15 CR 28.623 Add attribute peeParametersList to SS definitions |
CR revised to S5-181496 |
Orange Romania | 28.623 14.1.0 CR#16 catB | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
revised | [WTS] [JSN] |
S5-181058 | Rel-15 CR 28.659 Add attribute peeParametersList to E-UTRAN NRM SS | CR | Orange Romania | 28.659 15.0.0 CR#22 catB | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
agreed | [WTS] [JSN] |
S5-181059 | Rel-15 CR 28.653 Add attribute peeParametersList to UTRAN NRM SS | CR | Orange Romania | 28.653 14.1.0 CR#18 catB | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
agreed | [WTS] [JSN] |
S5-181060 | Rel-15 CR 28.622 Add attribute peeParametersList to IOC ManagedFunction | CR | Orange Romania | 28.622 14.2.0 CR#22 catB | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
agreed | [WTS] [JSN] |
S5-181061 | Rel-15 CR 32.425 Add PEE measurements and use case | CR | Orange Romania | 32.425 14.1.0 CR#168 catB | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
agreed | [WTS] [JSN] |
S5-181062 | Rel-15 CR 32.405 Add PEE measurements and use case | CR | Orange Romania | 32.405 14.0.0 CR#79 catB | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
agreed | [WTS] [JSN] |
S5-181063 | Rel-15 CR 52.402 Add PEE measurements and use case | CR | Orange Romania | 52.402 14.0.0 CR#9 catB | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
agreed | [WTS] [JSN] |
S5-181064 | Revised WID Control and monitoring of PEE parameters in RAN |
WID revised revised to S5-181497 |
Orange Romania | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
revised | [WTS] [JSN] | |
S5-181065 | Presentation sheet of TS 28.304 for Approval | TS or TR cover | Orange Romania | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] | |
S5-181066 | Presentation sheet of TS 28.305 for Approval | TS or TR cover | Orange Romania | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] | |
S5-181067 | Presentation sheet of TS 28.306 for Approval | TS or TR cover | Orange Romania | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] | |
S5-181068 | pCR TR 32.972 Potential measurement methods for 5G networks |
pCR revised to S5-181515 |
Orange Romania | 32.972 0.3.0 | FS_EE_5G | Rel-15 |
S5-117 AI: 6.5.4 |
revised | [WTS] [JSN] |
S5-181069 | pCR TR 32.972 Architecture options for EE control framework |
pCR revised to S5-181516 |
Orange Romania | 32.972 0.3.0 | FS_EE_5G | Rel-15 |
S5-117 AI: 6.5.4 |
revised | [WTS] [JSN] |
S5-181070 | New WID on forward compatibility for 3GPP Diameter Charging Applications |
WID new revised to S5-181304 |
Nokia, Nokia Shanghai Bell | Rel-15 |
S5-117 AI: 7.2 |
revised | [WTS] [JSN] | ||
S5-181071 | Rel-13 CR 32.298 Correction ASN.1 syntax | CR | Nokia, Nokia Shanghai Bell | 32.298 13.9.0 CR#651 catF | CIoT-CH | Rel-13 |
S5-117 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-181072 | Rel-14 CR 32.298 Correction ASN.1 Syntax | CR | Nokia, Nokia Shanghai Bell | 32.298 14.5.0 CR#652 catF | CH14-ProSe | Rel-14 |
S5-117 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-181073 | Rel-15 CR 32.298 Correction ASN.1 syntax | CR | Nokia, Nokia Shanghai Bell | 32.298 15.1.0 CR#653 catA | CH14-ProSe | Rel-15 |
S5-117 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-181074 | Rel-14 CR 32.260 Correction on FE Identifier list | CR | Nokia, Nokia Shanghai Bell | 32.26 14.3.0 CR#389 catF | CH14-DCCII | Rel-14 |
S5-117 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-181075 | Rel-15 CR 32.240 Introduction of 5G in the scope scope and references |
CR revised to S5-181320 |
Nokia, Nokia Shanghai Bell, Huawei,China Mobile | 32.24 15.0.0 CR#395 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-181076 | Rel-15 CR 32.240 Introduction of 5G in charging architecture |
CR revised to S5-181321 |
Nokia, Nokia Shanghai Bell | 32.24 15.0.0 CR#396 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-181077 | pCR 28.550 Add 5G PM service framework |
pCR revised to S5-181349 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181078 | pCR 28.550 Add UC and requirements on creation of measurement job for NF |
pCR revised to S5-181363 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181079 | pCR 28.550 Add UC and requirements on reporting performance data of NF |
pCR revised to S5-181478 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181080 | pCR 28.550 Add UC and requirements on creation of measurement job for NSSI |
pCR revised to S5-181479 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181081 | pCR 28.550 Add UC and requirements on reporting performance data of 3GPP network |
pCR revised to S5-181480 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181082 | pCR 28.550 Add UC and requirements on creation of measurement job for NSI |
pCR revised to S5-181481 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181083 | pCR 28.550 Add UC and requirements on creation of measurement job for non-slice-specific 3GPP network |
pCR revised to S5-181485 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181084 | pCR 28.552 Add performance measurements related to RRC connection establishment | pCR | Intel Mobile France | 28.552 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
noted | [WTS] [JSN] |
S5-181085 | pCR 28.550 Add scope |
pCR revised to S5-181543 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181086 | pCR 28.552 Add scope |
pCR revised to S5-181486 |
Intel Mobile France | 28.552 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181087 | pCR 28.553 Add scope |
pCR revised to S5-181489 |
Intel Mobile France | 28.553 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181088 | Way forward proposal for TS 28.550 and TS 28.551 |
discussion revised to S5-181465 |
Intel Mobile France | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] | ||
S5-181089 | CR Rel-15 32.298 Add CDR parameter for WLAN-based ProSe direct discovery |
CR revised to S5-181415 |
Intel Mobile France | 32.298 15.1.0 CR#654 catB | ProSe_WLAN_DD-CH | Rel-15 |
S5-117 AI: 7.4.5 |
revised | [WTS] [JSN] |
S5-181090 | CR Rel-15 32.299 Add Diameter AVP for charging of WLAN-based ProSe direct discovery |
CR revised to S5-181416 |
Intel Mobile France | 32.299 15.1.0 CR#796 catB | ProSe_WLAN_DD-CH | Rel-15 |
S5-117 AI: 7.4.5 |
revised | [WTS] [JSN] |
S5-181091 | pCR 32.868 Add potential solutions for CM of WT for non-collocated LWA |
pCR revised to S5-181510 |
Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-181092 | pCR 32.868 Add potential solutions for CM of eNB for LWA and LWIP |
pCR revised to S5-181511 |
Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-181093 | pCR 32.868 Add potential solutions for monitoring of user data transmission on Xw interface for non-collocated LWA | pCR | Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-181094 | pCR 32.868 Add potential solutions for monitoring of XwAP procedures for non-collocated LWA | pCR | Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-181095 | pCR 32.868 Add potential solutions for monitoring of user data transmission via WLAN for LWIP | pCR | Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-181096 | pCR 32.868 Add potential solutions for monitoring of RRC procedures for LWA and LWIP |
pCR revised to S5-181513 |
Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-181097 | Draft CR 28.510 extend the scope to support 5G networks | CR | Intel K.K. | 28.51 14.1.0 CR#2 catB | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] |
S5-181098 | pCR 32.868 Add potential solutions for FM of LWA and LWIP | pCR | Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-181099 | Presentation sheet of TR 32.868 for information | TS or TR cover | Intel Mobile France | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
approved | [WTS] [JSN] | |
S5-181100 | Draft CR 28.525 extend the scope to support 5G networks | CR | Intel K.K. | 28.525 14.1.0 CR#3 catB | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] |
S5-181101 | Draft CR 28.511 extend the scope to support 5G networks | CR | Intel K.K. | 28.511 14.0.0 CR#1 catB | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] |
S5-181102 | Draft CR 28.526 extend the scope to support 5G networks | CR | Intel K.K. | 28.526 14.0.0 CR#1 catB | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] |
S5-181103 | Rel-15 Work steps for management function service interface specifications | discussion | Ericsson Inc. | Rel-15 |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | ||
S5-181104 | Rel-15 28533 Notification Mfs and Notification Log Mfs |
pCR revised to S5-181346 |
Ericsson Inc. | 28.533 0.0.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181105 | TD Rel-15 TD Template for TS specifications for PM FM CM |
discussion revised to S5-181335 |
Ericsson Inc. | Rel-15 |
S5-117 AI: 6.1 |
revised | [WTS] [JSN] | ||
S5-181106 | pCR Rel-15 TS 28533 management function service framework | pCR | Ericsson Inc. | 28.533 0.0.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] |
S5-181107 | pCR Rel-15 TS 28541 NR NRM IRP |
pCR revised to S5-181432 |
Ericsson Inc. | 28.541 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181108 | pCR Rel-15 TS 28532 Slice management model | pCR | Ericsson,Huawei | 28.532 1.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
merged | [WTS] [JSN] |
S5-181109 | pCR to 32.857 Introduction Recommendations.doc |
pCR revised to S5-181509 |
Cisco Systems Inc. | 32.857 0.6.0 | FS_OAM_IOT | Rel-15 |
S5-117 AI: 6.5.1 |
revised | [WTS] [JSN] |
S5-181110 | Presentation of TR 32.857 to SA for approval | TS or TR cover | Cisco Systems Inc. | FS_OAM_IOT | Rel-15 |
S5-117 AI: 6.5.1 |
approved | [WTS] [JSN] | |
S5-181111 | pCR to 28.530 Network Slice as a Service |
pCR revised to S5-181355 |
Cisco Systems Inc. | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181112 | pCR to 28.530 Non-3GPP parts |
pCR revised to S5-181357 |
Cisco Systems Inc. | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181113 | pCR to 28.530 NSI Management aspects |
pCR revised to S5-181358 |
Cisco Systems Inc. | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181114 | pCR to 28.531 MANO role |
pCR revised to S5-181391 |
Cisco Systems Inc. | 28.531 0.2.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181115 | pCR to 28.531 Configuration of the RAN NSSI constituents |
pCR revised to S5-181369 |
Cisco Systems Inc. | 28.531 0.2.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181116 | LS reply to ITU-T SG5 (Q6/5) on Energy Efficiency |
LS out LS is reply to S5-181052 LS To: ITU-T SG5 (Q6/5) revised to S5-181332 |
Orange Romania | Rel-15 |
S5-117 AI: 6.5.4 |
revised | [WTS] [JSN] | ||
S5-181117 | pCR TS 28.533 Input to SBA for the management of 5G networks | pCR | Orange Romania | 28.533 0.0.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
merged | [WTS] [JSN] |
S5-181118 | Draft CR 28.510 extend the scope to support 5G networks | draftCR | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181119 | Draft CR 28.511 extend the scope to support 5G networks | draftCR | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181120 | Draft CR 28.525 extend the scope to support 5G networks | draftCR | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181121 | Draft CR 28.526 extend the scope to support 5G networks | draftCR | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181122 | pCR 28.525 add a use case of NS instantiation | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181123 | pCR 28.525 add use cases of PNF management - addition, removal, and modification | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181124 | pCR TR 28.900 – Positioning of ONAP/DCAE wrt. 3GPP reference management architecture |
pCR revised to S5-181128 |
Orange Romania | 28.9 0.1.1 | FS_ONAPDCAE | Rel-15 |
S5-117 AI: 6.5.5 |
revised | [WTS] [JSN] |
S5-181125 | pCR 28.525 add use case of updating transport network requirements of the F1 interface | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181126 | pCR TR 28.900 – Communication principles for notifications |
pCR revised to S5-181519 |
AT&T, Orange | 28.9 0.1.1 | FS_ONAPDCAE | Rel-15 |
S5-117 AI: 6.5.5 |
revised | [WTS] [JSN] |
S5-181127 | pCR 28.526 add a procedure of NS instantiation | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181128 | pCR TR 28.900 – Positioning of ONAP/DCAE wrt. 3GPP reference management architecture |
pCR revision of S5-181124 revised to S5-181518 |
AT&T, Orange | 28.9 0.1.1 | FS_ONAPDCAE | Rel-15 |
S5-117 AI: 6.5.5 |
revised | [WTS] [JSN] |
S5-181129 | pCR 28.526 add procedures of PNF addition, modification and removal | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181130 | pCR 28.526 add a procedure of Transport network requirements update | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-181131 | LS to ONAP - New study on integration of ONAP DCAE and 3GPP management architecture |
LS out LS To: ONAP revised to S5-181520 |
AT&T, Orange | Rel-15 |
S5-117 AI: 6.5.5 |
revised | [WTS] [JSN] | ||
S5-181132 | Update on Management aspects of a slice instance |
pCR revised to S5-181378 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181133 | Proposed addition of Business level general requirements |
pCR revised to S5-181379 |
ETRI | 28.53 0.3.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181134 | Proposed addition of Business level network slicing management requirements |
pCR revised to S5-181380 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181135 | Rel-15 CR 32.867 editorial correction and supplement |
CR revised to S5-181339 |
Huawei | 32.867 15.0.0 CR#1 catB | FS_MECUPS | Rel-15 |
S5-117 AI: 6.3 |
revised | [WTS] [JSN] |
S5-181136 | Function priority and objective proposal for 5G network and network slicing management in Rel-15 |
discussion revised to S5-181345 |
Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] | |
S5-181137 | pCR 28.530 Management and orchestration of 5G networks |
pCR revised to S5-181373 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181138 | pCR 28.530 Add high level use case of communication service using network slice or network without slicing |
pCR revised to S5-181381 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181139 | pCR 28.530 Add the set of network slicing management functions | pCR | Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] |
S5-181140 | pCR 28.530 Add use case and requirements of management support network slice selection | pCR | Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] |
S5-181141 | pCR 28.530 Add principles and update clause 4.8 and 4.9 for 5G network management |
pCR revised to S5-181374 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181142 | pCR 28.530 Add business level use case and requirements for the exposure of management services for network slice as a service case |
pCR revised to S5-181383 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181143 | pCR 28.530 Update network slice as a service |
pCR revised to S5-181356 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181144 | pCR 28.530 Add use case for provisioning of a network slice subnet instance |
pCR revised to S5-181384 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181145 | pCR 28.530 Add use case for provisioning of a network slice instance |
pCR revised to S5-181385 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181146 | Network slice management architecture options |
discussion revised to S5-181334 |
Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] | |
S5-181147 | Discussion and proposal for tenant uses | discussion | Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] | |
S5-181148 | Discussion about slice management and subscription management | discussion | Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] | |
S5-181149 | pCR 28.530 Add requirement for verification of a communication service request |
pCR revised to S5-181388 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181150 | Proposed Update on Principles of Background and Concepts section |
pCR revised to S5-181343 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181151 | pCR 28.531 Rapporteur proposal for skeleton change and adding content for scope | pCR | Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181152 | pCR 28.531 Provisioning of 5G networks |
pCR revised to S5-181361 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181153 | Way forward to indicate the Rel-15 priorities for provisioning WI |
discussion revised to S5-181359 |
Huawei, Nokia | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] | |
S5-181154 | pCR 28.531 Adding requirements for network slice subnet template | pCR | Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
noted | [WTS] [JSN] |
S5-181155 | pCR 28.531 Adding use case and requirements of network slice subnet template information querying |
pCR revised to S5-181393 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181156 | pCR 28.532 Add procedure of network slice subnet allocation | pCR | Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
noted | [WTS] [JSN] |
S5-181157 | pCR 28.532 Add procedure of network slice allocation |
pCR revised to S5-181404 |
Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181158 | pCR 28.532 Adding information model for managednetworkslice and managednetworkslicesubnet |
pCR revised to S5-181406 |
Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181159 | Draft TS 28.532 skeleton | draft TS | Huawei | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
withdrawn | [WTS] [JSN] | |
S5-181160 | pCR 28.532 Adding new clauses proposal |
pCR revised to S5-181402 |
Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181161 | pCR 28.532 Add procedure of coordination with TN Manager | pCR | Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
noted | [WTS] [JSN] |
S5-181162 | pCR 28.531 Clarification on TN coordination issue in clause 5.1.1 | pCR | Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
noted | [WTS] [JSN] |
S5-181163 | pCR 28.531 Add configuration information for the constituents of an NSI |
pCR revised to S5-181370 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181164 | pCR 28.531 Add use case and requirements of feasibility check of a network slice |
pCR revised to S5-181362 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181165 | pCR 28.531 Add use case and requirements on termination of a network slice subnet instance |
pCR revised to S5-181364 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181166 | pCR 28.531 Add use case and requirement for multi-operator NSI creation |
pCR revised to S5-181365 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181167 | pCR 28 532 Add class diagrams for network slice and network slice subnet |
pCR revised to S5-181407 |
Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181168 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice instance |
pCR revised to S5-181408 |
Huawei, China Unicom, CATR | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181169 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice subnet instance |
pCR revised to S5-181424 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181170 | pCR 28.531 Add use case and requirements on modification of a network slice instance |
pCR revised to S5-181425 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181171 | pCR 28.531 Add use case and requirements on modification of a network slice subnet instance |
pCR revised to S5-181426 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181172 | pCR 28.531 Add use case and requirements on associating a different network slice subnet template version to a network slice subnet instance | pCR | Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
noted | [WTS] [JSN] |
S5-181173 | pCR 28.542 Adding NR NRM modelling |
pCR revised to S5-181433 |
Huawei | 28.542 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181174 | Discussion and proposal for MEC in network slice context |
discussion revised to S5-181352 |
Huawei | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] | |
S5-181175 | pCR 28.545 Add use case and requirements on alarm notification of network slicing | pCR | Huawei, China Unicom | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
merged | [WTS] [JSN] |
S5-181176 | pCR 28.545 Add network slice related management functions for fault supervision of network slicing |
pCR revised to S5-181443 |
Huawei | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181177 | pCR 28.550 on adding use case for measurement of UL and DL user plane delay |
pCR revised to S5-181488 |
Huawei | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181178 | pCR 28.550 Add description on performance management for 5G networks and network slicing |
pCR revised to S5-181476 |
Huawei, CATR, China Unicom | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181179 | pCR 28.550 Add general description on performance management requirements for 5G networks and network slicing | pCR | Huawei, China Unicom, CATR | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
merged | [WTS] [JSN] |
S5-181180 | pCR 28.550 Add use case and requirements on performance measurement of network slice instance | pCR | Huawei, China Unicom | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
merged | [WTS] [JSN] |
S5-181181 | pCR 28.550 Add use case and requirements on performance measurement of network slice subnet instance | pCR | Huawei, China Unicom | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
merged | [WTS] [JSN] |
S5-181182 | pCR 28.550 Add network slice related management functions for assurance data and performance management of network slicing | pCR | Huawei, CATR, China Unicom | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
merged | [WTS] [JSN] |
S5-181183 | pCR 28.554 Add classification of end-to-end KPIs for 5G networks and network slicing |
pCR revised to S5-181477 |
Huawei | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181184 | pCR draft TS 28.545 Add use case subscription of alarm notifications of NSI |
pCR revised to S5-181396 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181185 | CR 28.707 Requirement for EPC situation | CR | Huawei | 28.707 14.0.0 CR#2 catB | ME_CUPS | Rel-15 |
S5-117 AI: 6.4.12 |
not pursued | [WTS] [JSN] |
S5-181186 | pCR 28.306 Add OpenAPI solution set descriptions |
pCR revised to S5-181501 |
Huawei | 28.306 1.0.0 | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
revised | [WTS] [JSN] |
S5-181187 | pCR 28.404 Use case and requirement for QoE collection |
pCR revised to S5-181502 |
Huawei | 28.404 0.2.0 | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-181188 | pCR draft TS 28.545 Add use case subscription of alarm notifications of NSSI |
pCR revised to S5-181397 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181189 | pCR draft TS 28.545 Add use case get alarmlist from NSMF |
pCR revised to S5-181398 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181190 | pCR draft TS 28.545 Add use case get alarmlist from NSSMF |
pCR revised to S5-181399 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181191 | pCR draft TS 28.545 Add use case acknowledge alarms |
pCR revised to S5-181400 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181192 | pCR draft TS 28.545 Add use case clear alarms |
pCR revised to S5-181401 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181193 | pCR TS 28.530 Add management support for NRF |
pCR revised to S5-181387 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181194 | R15 CR 32.240 Introduction of 5G converged charging |
CR revised to S5-181323 |
China Mobile | 32.24 15.0.0 CR#397 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-181195 | R15 CR 32.240 Introduction of 5G service based interface |
CR revised to S5-181329 |
China Mobile | 32.24 15.0.0 CR#398 catB | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-181196 | R15 pCR 32.290 Introduce the architecture |
pCR revised to S5-181410 |
China Mobile | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-181197 | R15 pCR 32.848 Support status of VoLTE service delivery |
pCR revised to S5-181422 |
China Mobile | 32.848 0.3.0 | FS_VBCLTE | Rel-15 |
S5-117 AI: 7.5.1 |
revised | [WTS] [JSN] |
S5-181198 | Rel-15 CR 32.240 Introduction of 5G in charging mechanisms |
CR revised to S5-181324 |
Nokia, Nokia Shanghai Bell | 32.24 15.0.0 CR#399 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-181199 | Rel-15 CR 32.240 Introduction of 5G in charging functions | CR | Nokia, Nokia Shanghai Bell | 32.24 15.0.0 CR#400 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
merged | [WTS] [JSN] |
S5-181200 | Replacement of 3G term |
CR revised to S5-181340 |
Ericsson GmbH, Eurolab | 32.411 14.0.0 CR#5 catF | OAM14 | Rel-14 |
S5-117 AI: 6.3 |
revised | [WTS] [JSN] |
S5-181201 | pCR 28.530 Adding description and requirements for NSI used to support multiple communication services |
pCR revised to S5-181389 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181202 | Replacement of 3G term |
CR revised to S5-181341 |
Ericsson GmbH, Eurolab | 32.401 14.2.0 CR#41 catF | OAM14 | Rel-14 |
S5-117 AI: 6.3 |
revised | [WTS] [JSN] |
S5-181203 | R15 CR 32.240 Introduce the 5G charging in Section 3 |
CR revised to S5-181322 |
Huawei | 32.24 15.0.0 CR#401 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-181204 | R15 CR 32.297 Introduce the Bea for NAPS Charging |
CR revised to S5-181310 |
Huawei | 32.297 14.0.0 CR#27 catB | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-181205 | R15 CR 32.899 Correction on the format of TR 32.899 |
CR revised to S5-181418 |
Huawei | 32.899 15.0.0 CR#1 catF | TEI15 | Rel-15 |
S5-117 AI: 7.3 |
revised | [WTS] [JSN] |
S5-181206 | Rel-15 pCR 32.254 Northbound API online charging scenarios |
pCR revised to S5-181313 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-181207 | Rel-15 pCR 32.254 Northbound API offline charging scenarios |
pCR revised to S5-181311 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-181208 | Rel-15 pCR 32.254 Data description for Northbound API online charging |
pCR revised to S5-181315 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-181209 | Rel-15 pCR 32.254 Data description for Northbound API offline charging |
pCR revised to S5-181314 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-181210 | Rel-15 pCR 32.254 Northbound API charging specific parameters |
pCR revised to S5-181316 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-181211 | Rel-15 pCR 32.254 Bindings for Northbound API offline charging |
pCR revised to S5-181317 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-181212 | Rel-15 pCR 32.254 Annex for charging Charging characteristics |
pCR revised to S5-181318 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-181213 | Rel-15 pCR 32.254 Correction on the name of Bapi | pCR | Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
approved | [WTS] [JSN] |
S5-181214 | Rel-15 pCR 32.291 Update of the skeleton |
pCR revised to S5-181414 |
Huawei | 32.291 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-181215 | Rel-15 pCR 32.290 Update of the skeleton |
pCR revised to S5-181330 |
Huawei | 32.29 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-181216 | Rel-15 pCR 32.290 Scope and Reference |
pCR revised to S5-181331 |
Huawei | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-181217 | pCR TR 32.871 adding the concepts of policy conflict detection and resolution |
pCR revised to S5-181514 |
China Mobile Com. Corporation | 32.871 0.4.0 | FS_NETPOL | Rel-15 |
S5-117 AI: 6.5.3 |
revised | [WTS] [JSN] |
S5-181218 | pCR TR 32.871 adding the concepts of policy conflict detection and resolution | pCR | China Mobile Com. Corporation | 32.871 0.4.0 | FS_NETPOL | Rel-15 |
S5-117 AI: 6.5.3 |
withdrawn | [WTS] [JSN] |
S5-181219 | Rel-15 pCR 32.290 Definitions, Symbols and Abbreviations |
pCR revised to S5-181409 |
Huawei | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-181220 | Rel-15 pCR 32.290 Addition of section 6 for TS 32.290 |
pCR revised to S5-181412 |
Huawei | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-181221 | Rel-15 pCR 32.290 Addition of section 5 for TS 32.290 |
pCR revised to S5-181411 |
Huawei | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-181222 | Discussion Paper on Service Definition | discussion | Huawei |
S5-117 AI: 7.4.2 |
noted | [WTS] [JSN] | |||
S5-181223 | pCR 28.530 Add requirements for NSI used to support multiple communication services | pCR | Huawei Technologies France | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
withdrawn | [WTS] [JSN] |
S5-181224 | pCR 28.530 Update the use case of Network slicing supporting communication services |
pCR revised to S5-181386 |
Huawei Technologies France | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181225 | DP on Configuration of the RAN NSSI constituents | discussion | Cisco Systems Inc. |
S5-117 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
S5-181226 | Rel-15 CR 32.298 Definition of how IMEI is to be transported in SubscriberEquipmentNumber |
CR revised to S5-181419 |
Ericsson | 32.298 15.1.0 CR#655 catF | TEI15 | Rel-15 |
S5-117 AI: 7.3 |
revised | [WTS] [JSN] |
S5-181227 | Rel-15 CR 32.299 Removal of filler in IMEISV | CR | Ericsson | 32.299 15.1.0 CR#797 catF | TEI15 | Rel-15 |
S5-117 AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-181228 | Rel-15 CR 32.251 Support for secondary RAT editors note removal |
CR revised to S5-181307 |
Ericsson | 32.251 15.1.0 CR#502 catB | EDCE5-CH | Rel-15 |
S5-117 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-181229 | Add new skeleton of 5G End to end Key Performance Indicators (KPI), performance measurements and assurance data |
pCR revised to S5-181490 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181230 | Rel-15 CR 32.298 Support for secondary RAT reporting from RAN |
CR revised to S5-181308 |
Ericsson | 32.298 15.1.0 CR#656 catB | EDCE5-CH | Rel-15 |
S5-117 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-181231 | Rel-15 CR 32.299 Support for secondary RAT reporting from RAN |
CR revised to S5-181309 |
Ericsson | 32.299 15.1.0 CR#798 catB | EDCE5-CH | Rel-15 |
S5-117 AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-181232 | New WID on Diameter Overload Control for Charging |
WID new revised to S5-181305 |
Ericsson | Rel-16 |
S5-117 AI: 7.2 |
revised | [WTS] [JSN] | ||
S5-181233 | Add scope of 5G End to end Key Performance Indicators (KPI), performance measurements and assurance data |
pCR revised to S5-181546 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181234 | Proposal on Charging Services for SBI | discussion | Ericsson | 5GS_Ph1-SBI_CH |
S5-117 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
S5-181235 | Way forward for fault supervision WI |
discussion revised to S5-181442 |
ZTE Corporation |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] | |||
S5-181236 | Add use case end-to-end latency measurements of Network Slice instance related KPI |
pCR revised to S5-181491 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181237 | Add use case for access number of single network slice related KPI |
pCR revised to S5-181498 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181238 | Add use case for IP throughput for one single network slice instance related KPI |
pCR revised to S5-181499 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181239 | Add use case for number of accessed network slice instances for one UE related KPI | pCR | China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
noted | [WTS] [JSN] |
S5-181240 | Way forward proposal for 5GNRM work item |
discussion revised to S5-181427 |
Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] | |
S5-181241 | pCR TS 28.540 Add content of scope |
pCR revised to S5-181428 |
Nokia, Nokia Shanghai Bell | 28.54 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181242 | pCR TS 28.541 Add content of scope |
pCR revised to S5-181431 |
Nokia, Nokia Shanghai Bell | 28.541 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181243 | pCR TS 28.542 Add content of scope | pCR | Nokia, Nokia Shanghai Bell | 28.542 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181244 | pCR TS 28.543 Add content of scope | pCR | Nokia, Nokia Shanghai Bell | 28.543 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181245 | pCR TS 28.540 Add background and requirements for NG-RAN |
pCR revised to S5-181429 |
Nokia, Nokia Shanghai Bell | 28.54 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181246 | pCR TS 28.540 Add background and requirements for MR-DC | pCR | Nokia, Nokia Shanghai Bell | 28.54 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181247 | pCR TS 28.541 Add class diagrams for NR node in EN-DC |
pCR revised to S5-181434 |
Nokia, Nokia Shanghai Bell | 28.541 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181248 | pCR TS 28.541 Add class definitions for NR node in EN-DC |
pCR revised to S5-181435 |
Nokia, Nokia Shanghai Bell | 28.541 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181249 | pCR TS 28.542 Add background and requirements for 5GC |
pCR revised to S5-181437 |
Nokia, Nokia Shanghai Bell | 28.542 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181250 | pCR TS 28.542 Add background and requirements for AMF Set |
pCR revised to S5-181438 |
Nokia, Nokia Shanghai Bell | 28.542 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181251 | pCR TS 28.543 Add class diagrams for 5GC |
pCR revised to S5-181440 |
Nokia, Nokia Shanghai Bell | 28.543 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181252 | pCR TS 28.543 Add class definitions for 5GC |
pCR revised to S5-181441 |
Nokia, Nokia Shanghai Bell | 28.543 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181253 | New WID on Charging aspects of of WLAN access in EPC |
WID new revised to S5-181306 |
Nokia, Nokia Shanghai Bell | Rel-15 |
S5-117 AI: 7.2 |
revised | [WTS] [JSN] | ||
S5-181254 | pCR 32.158 Add skeleton | pCR | Nokia Corporation | 32.158 0.0.0 | REST_SS | Rel-15 |
S5-117 AI: 6.4.11 |
approved | [WTS] [JSN] |
S5-181255 | pCR 32.158 Add general rules |
pCR revised to S5-181506 |
Nokia Corporation | 32.158 0.0.0 | REST_SS | Rel-15 |
S5-117 AI: 6.4.11 |
revised | [WTS] [JSN] |
S5-181256 | pCR 32.158 Add design patterns |
pCR revised to S5-181507 |
Nokia Corporation | 32.158 0.0.0 | REST_SS | Rel-15 |
S5-117 AI: 6.4.11 |
revised | [WTS] [JSN] |
S5-181257 | Communication methods |
discussion revised to S5-181353 |
Ericsson Limited |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] | |||
S5-181258 | pCR 28.530 Actor roles correction | pCR | Ericsson Limited | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181259 | pCR 28.530 Alignment requirements text | pCR | Ericsson Limited | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181260 | pCR 28.530 Fault management use case update | pCR | Ericsson Limited | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181261 | pCR 28.530 Remove section 4.9 |
pCR revised to S5-181523 |
Ericsson Limited | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181262 | Indication of QoE Information Collection |
pCR revised to S5-181503 |
Ericsson | 28.404 0.2.0 | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-181263 | pCR 28.533 Add introduction and scope |
pCR revised to S5-181354 |
Ericsson Limited | 28.533 0.0.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181264 | pCR 28.530 Terminology alignment |
pCR revised to S5-181522 |
Ericsson Limited | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181265 | Rel-15 pCR 32.255 Introduce Scope and References |
pCR revised to S5-181325 |
Nokia, Nokia Shanghai Bell | 32.255 0.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-181266 | pCR R15 28.405-000 Introduction and scope |
pCR revised to S5-181504 |
Ericsson | 28.405 0.0.0 | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-181267 | pCR R15 28.405-000 Add activation and deactivation for UTRAN |
pCR revised to S5-181505 |
Ericsson | 28.405 0.0.0 | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-181268 | Sequence proposal for management and orchestration of 5G networks and network slicing agenda point 6.4.1 |
other revised to S5-181342 |
Ericsson Limited |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] | |||
S5-181269 | CR R8 32.511-830 Converting Editor’s Note | CR | Ericsson | 32.511 8.3.0 CR#19 catF | OAM8 | Rel-8 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181270 | CR R9 32.511-910 Converting Editor’s Note | CR | Ericsson | 32.511 9.1.0 CR#20 catA | OAM8 | Rel-9 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181271 | CR R10 32.511-a10 Converting Editor’s Note | CR | Ericsson | 32.511 10.1.0 CR#21 catA | OAM8 | Rel-10 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181272 | CR R11 32.511-b30 Converting Editor’s Note | CR | Ericsson | 32.511 11.3.0 CR#22 catA | OAM8 | Rel-11 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181273 | CR R12 32.511-c10 Converting Editor’s Note | CR | Ericsson | 32.511 12.1.0 CR#23 catA | OAM8 | Rel-12 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181274 | CR R13 32.511-d10 Converting Editor’s Note | CR | Ericsson | 32.511 13.1.0 CR#24 catA | OAM8 | Rel-13 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181275 | CR R14 32.511-e10 Converting Editor’s Note | CR | Ericsson | 32.511 14.1.0 CR#25 catA | OAM8 | Rel-14 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181276 | Rel-15 pCR 32.255 Introduction of architecture description |
pCR revised to S5-181326 |
Nokia, Nokia Shanghai Bell | 32.255 0.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-181277 | Tdoc discussion sequence proposal for agenda 6.4.3 | other | Nokia | Rel-15 |
S5-117 AI: 6.4.3 |
noted | [WTS] [JSN] | ||
S5-181278 | Rel-15 workload management in the OAM&P SWG |
discussion revised to S5-181336 |
OAM&P SWG chairman | Rel-15 |
S5-117 AI: 6.1 |
revised | [WTS] [JSN] | ||
S5-181279 | Minutes call on Rel-15 workload management in the OAM&P SWG | report | OAM&P SWG chairman | Rel-15 |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | ||
S5-181280 | LS from NGMN forwarded to SA5 on Architectural Proposal for the Handling of Network Operations Data with Specific Focus on Virtualized Networks |
LS in LS reply in S5-181337, S5-181337 |
NGMN |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-181281 | LS from BBF cc SA5 on 5G-FMC – First release of BBF study results | LS in | BBF |
S5-117 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-181282 | Rel-13 CR 32.297 Correction on Monitoring event CDRs file | CR | Nokia, Nokia Shanghai Bell | 32.297 13.2.0 CR#28 catF | MONTE-CH | Rel-13 |
S5-117 AI: 7.3 |
withdrawn | [WTS] [JSN] |
S5-181283 | Rel-14 CR 32.297 Correction on Monitoring event CDRs file |
CR revised to S5-181285 |
Nokia, Nokia Shanghai Bell | 32.297 14.0.0 CR#29 catA | MONTE-CH | Rel-14 |
S5-117 AI: 7.3 |
revised | [WTS] [JSN] |
S5-181284 | LS from NGMN to SA5 on NGMN White Paper on Service-based Architecture in 5G | LS in | NGMN |
S5-117 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-181285 | Rel-15 CR 32.297 Add Bmn for Monitoring event CDRs file transfer in symbols |
CR revision of S5-181283 |
Nokia, Nokia Shanghai Bell | 32.297 14.0.0 CR#291 catD | MONTE-CH, TEI15 | Rel-15 |
S5-117 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-181286 | Way forward proposal for MNFV5G WI |
discussion revised to S5-181444 |
Intel K.K. | Rel-15 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] | ||
S5-181287 | LS from GSMA to SA5 on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic | LS in | GSMA |
S5-117 AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-181288 | Contributions discussion sequence for agenda item 6.4.2 | other | Huawei | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
noted | [WTS] [JSN] | |
S5-181289 | Terminology alignment | discussion | Ericsson Limited |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] | |||
S5-181290 | SA5 working procedures update on email approvals | other | Ericsson LM |
S5-117 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-181291 | CR R15 32.592 Add NB IoT parameters | CR | Nokia Japan | 32.592 14.0.0 CR#38 catB | HNB_eHNB-OAM_Type1 | Rel-15 |
S5-117 AI: 6.3 |
withdrawn | [WTS] [JSN] |
S5-181292 | Discussion paper on 5G charging Rel-15 | discussion | CH SWG Chair | Rel-15 |
S5-117 AI: 7.2 |
noted | [WTS] [JSN] | ||
S5-181293 | Discussion paper for API exposure and charging | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
S5-117 AI: 7.4.4 |
noted | [WTS] [JSN] | ||
S5-181294 | Reply LS from CT4 to SA5 on AVPs range numbers for Rel-15 | LS in | C4-181211 |
S5-117 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-181295 | Reply LS from CT4 to SA5 on 5G Charging Study Phase 1 on N4 |
LS in LS reply in S5-181302, S5-181302 |
C4-181381 |
S5-117 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-181296 | LS from SA3 to SA5 on the status of work on interfaces |
LS in LS reply in S5-181338, S5-181338, S5-181455 revised to S5-181338 |
S3-180436 |
S5-117 AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-181297 | TS quality campaign update |
other revised to S5-181536 |
Ericsson LM |
S5-117 AI: 5.1 |
revised | [WTS] [JSN] | |||
S5-181298 | Report from methodology coordination meeting with ITU-T SG2 | report | Ericsson LM |
S5-117 AI: 4.3 |
noted | [WTS] [JSN] | |||
S5-181299 | LS from CT1 cc SA5 on Service types for QMC reporting | LS in | C1-180636 |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-181300 | LS from CT1 to SA5 on charging issues when PLMN changes |
LS in LS reply in S5-181303, S5-181303 |
C1-180748 |
S5-117 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-181301 | Time Plan for OAM&P |
other revision of S5-181017 |
WG Vice Chair (Huawei) |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-181302 | Reply LS to CT4 on 5G Charging Study Phase 1 on N4 |
LS out LS is reply to S5-181295 LS To: CT4 |
Nokia, Nokia Shanghai Bell |
S5-117 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-181303 | Reply to: LS from CT1 to SA5 on charging issues when PLMN changes |
LS out LS is reply to S5-181300 LS To: CT1 |
Ericsson |
S5-117 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-181304 | New WID on forward compatibility for 3GPP Diameter Charging Applications |
WID new revision of S5-181070 |
Nokia, Nokia Shanghai Bell | Rel-15 |
S5-117 AI: 7.2 |
agreed | [WTS] [JSN] | ||
S5-181305 | New WID on Diameter Overload Control for Charging |
WID new revision of S5-181232 |
Ericsson | Rel-16 |
S5-117 AI: 7.2 |
agreed | [WTS] [JSN] | ||
S5-181306 | New WID on Charging aspects of of WLAN access in EPC |
WID new revision of S5-181253 |
Nokia, Nokia Shanghai Bell | Rel-15 |
S5-117 AI: 7.2 |
agreed | [WTS] [JSN] | ||
S5-181307 | Rel-15 CR 32.251 Support for secondary RAT |
CR revision of S5-181228 |
Ericsson | 32.251 15.1.0 CR#5021 catB | EDCE5-CH | Rel-15 |
S5-117 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-181308 | Rel-15 CR 32.298 Support for secondary RAT reporting from RAN |
CR revision of S5-181230 |
Ericsson | 32.298 15.1.0 CR#6561 catB | EDCE5-CH | Rel-15 |
S5-117 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-181309 | Rel-15 CR 32.299 Support for secondary RAT reporting from RAN |
CR revision of S5-181231 |
Ericsson | 32.299 15.1.0 CR#7981 catB | EDCE5-CH | Rel-15 |
S5-117 AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-181310 | R15 CR 32.297 Introduce the Bea for NAPS Charging |
CR revision of S5-181204 |
Huawei | 32.297 14.0.0 CR#271 catB | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
agreed | [WTS] [JSN] |
S5-181311 | Rel-15 pCR 32.254 Northbound API offline charging scenarios |
pCR revision of S5-181207 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
approved | [WTS] [JSN] |
S5-181312 | Draft TS 28.541 | draft TS | Nokia | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] | |
S5-181313 | Rel-15 pCR 32.254 Northbound API online charging scenarios |
pCR revision of S5-181206 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
approved | [WTS] [JSN] |
S5-181314 | Rel-15 pCR 32.254 Data description for Northbound API offline charging |
pCR revision of S5-181209 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
approved | [WTS] [JSN] |
S5-181315 | Rel-15 pCR 32.254 Data description for Northbound API online charging |
pCR revision of S5-181208 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
approved | [WTS] [JSN] |
S5-181316 | Rel-15 pCR 32.254 Northbound API charging specific parameters |
pCR revision of S5-181210 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
approved | [WTS] [JSN] |
S5-181317 | Rel-15 pCR 32.254 Bindings for Northbound API offline charging |
pCR revision of S5-181211 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
approved | [WTS] [JSN] |
S5-181318 | Rel-15 pCR 32.254 Annex for charging Charging characteristics |
pCR revision of S5-181212 |
Huawei | 32.254 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
agreed | [WTS] [JSN] |
S5-181319 | Draft TS 32.254 | draft TS | Huawei | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.4 |
approved | [WTS] [JSN] | |
S5-181320 | Rel-15 CR 32.240 Introduction of 5G in the scope scope and references |
CR revision of S5-181075 |
Nokia, Nokia Shanghai Bell, Huawei,China Mobile | 32.24 15.0.0 CR#3951 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-181321 | Rel-15 CR 32.240 Introduction of 5G in charging architecture |
CR revision of S5-181076 |
Nokia, Nokia Shanghai Bell | 32.24 15.0.0 CR#3961 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-181322 | R15 CR 32.240 Introduce the 5G charging in Section 3 |
CR revision of S5-181203 |
Huawei | 32.24 15.0.0 CR#4011 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-181323 | R15 CR 32.240 Introduction of 5G converged charging |
CR revision of S5-181194 |
China Mobile | 32.24 15.0.0 CR#3971 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-181324 | Rel-15 CR 32.240 Introduction of 5G in charging mechanisms |
CR revision of S5-181198 |
Nokia, Nokia Shanghai Bell | 32.24 15.0.0 CR#3991 catB | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-181325 | Rel-15 pCR 32.255 Introduce Scope and References |
pCR revision of S5-181265 |
Nokia, Nokia Shanghai Bell | 32.255 0.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-181326 | Rel-15 pCR 32.255 Introduction of architecture description |
pCR revision of S5-181276 |
Nokia, Nokia Shanghai Bell | 32.255 0.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-181327 | Rel-15 pCR 32.255 Skeleton – chapters organisation | pCR | Nokia, Nokia Shanghai Bell | 32.255 0.0.0 | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
approved | [WTS] [JSN] |
S5-181328 | Draft TS 32.255 | draft TS | Nokia, Nokia Shanghai Bell | 5GS_Ph1-DCH | Rel-15 |
S5-117 AI: 7.4.1 |
approved | [WTS] [JSN] | |
S5-181329 | R15 CR 32.240 Introduction of 5G service based interface |
CR revision of S5-181195 |
China Mobile | 32.24 15.0.0 CR#3981 catB | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
agreed | [WTS] [JSN] |
S5-181330 | Rel-15 pCR 32.290 Update of the skeleton |
pCR revision of S5-181215 |
Huawei | 32.29 0.2.0 | NAPS-CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-181331 | Rel-15 pCR 32.290 Scope and Reference |
pCR revision of S5-181216 |
Huawei | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-181332 | LS reply to ITU-T SG5 (Q6/5) on Energy Efficiency |
LS out LS is reply to S5-181052 LS To: ITU-T SG5 (Q6/5) revision of S5-181116 revised to S5-181483 |
Orange Romania | Rel-15 |
S5-117 AI: 6.5.4 |
revised | [WTS] [JSN] | ||
S5-181333 | Rel-15 Work steps for management function service interface specifications | discussion | Ericsson Inc. | Rel-15 |
S5-117 AI: 6.1 |
withdrawn | [WTS] [JSN] | ||
S5-181334 | Network slice management architecture options |
discussion revision of S5-181146 |
Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] | |
S5-181335 | TD Rel-15 TD Template for TS specifications for PM FM CM |
discussion revision of S5-181105 revised to S5-181454 |
Ericsson Inc. | Rel-15 |
S5-117 AI: 6.1 |
revised | [WTS] [JSN] | ||
S5-181336 | Rel-15 workload management in the OAM&P SWG |
discussion revision of S5-181278 |
OAM&P SWG chairman | Rel-15 |
S5-117 AI: 6.1 |
endorsed | [WTS] [JSN] | ||
S5-181337 | Reply to: LS from NGMN forwarded to SA5 on Architectural Proposal for the Handling of Network Operations Data with Specific Focus on Virtualized Networks |
LS out LS is reply to S5-181280 LS To: NGMN |
Huawei |
S5-117 AI: 6.1 |
withdrawn | [WTS] [JSN] | |||
S5-181338 | Reply to: LS from SA3 to SA5 on the status of work on interfaces |
LS out LS is reply to S5-181296 LS To: SA3 revision of S5-181296 revised to S5-181455 |
Huawei |
S5-117 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-181339 | Rel-15 CR 32.867 editorial correction and supplement |
CR revision of S5-181135 revised to S5-181484 |
Huawei | 32.867 15.0.0 CR#11 catB | FS_MECUPS | Rel-15 |
S5-117 AI: 6.3 |
revised | [WTS] [JSN] |
S5-181340 | Replacement of 3G term |
CR revision of S5-181200 |
Ericsson GmbH, Eurolab | 32.411 14.0.0 CR#51 catF | TEI14 | Rel-14 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181341 | Replacement of 3G term |
CR revision of S5-181202 |
Ericsson GmbH, Eurolab | 32.401 14.2.0 CR#411 catF | TEI14 | Rel-14 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181342 | Sequence proposal for management and orchestration of 5G networks and network slicing agenda point 6.4.1 |
other revision of S5-181268 |
Ericsson Limited |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] | |||
S5-181343 | Proposed Update on Principles of Background and Concepts section |
pCR revision of S5-181150 revised to S5-181377 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181344 | LS on Reply from CT3 cc SA5 on 5G Specification of N28 interface | LS in | C3-180174 |
S5-117 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-181345 | Function priority and objective proposal for 5G network and network slicing management in Rel-15 |
discussion revision of S5-181136 |
Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
S5-181346 | Rel-15 28533 Notification Mfs and Notification Log Mfs |
pCR revision of S5-181104 |
Ericsson Inc. | 28.533 0.0.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
noted | [WTS] [JSN] |
S5-181347 | pCR Rel-15 TS 28533 management function service framework | pCR | Ericsson Inc. | 28.533 0.0.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
withdrawn | [WTS] [JSN] |
S5-181348 | pCR TS 28.533 Input to SBA for the management of 5G networks | pCR | Orange Romania | 28.533 0.0.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
withdrawn | [WTS] [JSN] |
S5-181349 | pCR 28.550 Add 5G PM service framework |
pCR revision of S5-181077 revised to S5-181539 |
Intel, Huawei, China Mobile, ZTE, CATR, China Unicom | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181350 | Discussion and proposal for tenant uses | discussion | Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
withdrawn | [WTS] [JSN] | |
S5-181351 | Discussion about slice management and subscription management | discussion | Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
withdrawn | [WTS] [JSN] | |
S5-181352 | Discussion and proposal for MEC in network slice context |
discussion revision of S5-181174 revised to S5-181460 |
Huawei | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] | |
S5-181353 | Communication methods |
discussion revision of S5-181257 |
Ericsson Limited |
S5-117 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |||
S5-181354 | pCR 28.533 Add introduction and scope |
pCR revision of S5-181263 |
Ericsson Limited | 28.533 0.0.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181355 | pCR to 28.530 Network Slice as a Service |
pCR revision of S5-181111 revised to S5-181366 |
Cisco Systems Inc. | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181356 | pCR 28.530 Update network slice as a service |
pCR revision of S5-181143 |
Huawei,China Southern Power Grid Co. | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181357 | pCR to 28.530 Non-3GPP parts |
pCR revision of S5-181112 |
Cisco Systems Inc. | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181358 | pCR to 28.530 NSI Management aspects |
pCR revision of S5-181113 |
Cisco Systems Inc. | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181359 | Way forward to indicate the Rel-15 priorities for provisioning WI |
discussion revision of S5-181153 |
Huawei, Nokia | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
endorsed | [WTS] [JSN] | |
S5-181360 | Draft TS 28.531 | draft TS | Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] | |
S5-181361 | pCR 28.531 Provisioning of 5G networks |
pCR revision of S5-181152 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181362 | pCR 28.531 Add use case and requirements of feasibility check of a network slice |
pCR revision of S5-181164 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181363 | pCR 28.550 Add UC and requirements on creation of measurement job for NF |
pCR revision of S5-181078 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181364 | pCR 28.531 Add use case and requirements on termination of a network slice subnet instance |
pCR revision of S5-181165 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181365 | pCR 28.531 Add use case and requirement for multi-operator NSI creation |
pCR revision of S5-181166 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
noted | [WTS] [JSN] |
S5-181366 | pCR to 28.530 Network Slice as a Service |
pCR revision of S5-181355 |
Cisco Systems Inc. | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181367 | Draft TS 28.530 | draft TS | Huawei | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] | |
S5-181368 | Draft TS 28.533 | draft TS | Ericsson | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] | |
S5-181369 | pCR to 28.531 Configuration of the RAN NSSI constituents |
pCR revision of S5-181115 |
Cisco Systems Inc. | 28.531 0.2.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181370 | pCR 28.531 Add configuration information for the constituents of an NSI |
pCR revision of S5-181163 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181371 | TDoc discussion sequence | other | Intel, CMCC |
S5-117 AI: 6.4.5 |
noted | [WTS] [JSN] | |||
S5-181372 | Reply to: LS from ITU-T SG15 to SA5 on Transport network management to support IMT-2020/5G |
LS out LS is reply to S5-181051 LS To: ITU-T SG15 |
Huawei |
S5-117 AI: 5.3 |
withdrawn | [WTS] [JSN] | |||
S5-181373 | pCR 28.530 Management and orchestration of 5G networks |
pCR revision of S5-181137 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181374 | pCR 28.530 Add principles and update clause 4.8 and 4.9 for 5G network management |
pCR revision of S5-181141 revised to S5-181482 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181375 | LS to ITU-TSG2 on new template for 5G management service stage 2 and stage 3 definitions |
LS out LS To: ITU-T SG2 |
WG Chair |
S5-117 AI: 5.3 |
approved | [WTS] [JSN] | |||
S5-181376 | pCR 28.530 Add the set of network slicing management functions | pCR | Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
withdrawn | [WTS] [JSN] |
S5-181377 | Proposed Update on Principles of Background and Concepts section |
pCR revision of S5-181343 revised to S5-181459 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181378 | Update on Management aspects of a slice instance |
pCR revision of S5-181132 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181379 | Proposed addition of Business level general requirements |
pCR revision of S5-181133 revised to S5-181457 |
ETRI | 28.53 0.3.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181380 | Proposed addition of Business level network slicing management requirements |
pCR revision of S5-181134 revised to S5-181458 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181381 | pCR 28.530 Add high level use case of communication service using network slice or network without slicing |
pCR revision of S5-181138 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181382 | pCR 28.530 Add use case and requirements of management support network slice selection | pCR | Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
withdrawn | [WTS] [JSN] |
S5-181383 | pCR 28.530 Add business level use case and requirements for the exposure of management services for network slice as a service case |
pCR revision of S5-181142 |
Huawei,China southern Power Grid Co. | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181384 | pCR 28.530 Add use case for provisioning of a network slice subnet instance |
pCR revision of S5-181144 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181385 | pCR 28.530 Add use case for provisioning of a network slice instance |
pCR revision of S5-181145 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181386 | pCR 28.530 Update the use case of Network slicing supporting communication services |
pCR revision of S5-181224 |
Huawei Technologies France | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181387 | pCR TS 28.530 Add management support for NRF |
pCR revision of S5-181193 revised to S5-181521 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181388 | pCR 28.530 Add requirement for verification of a communication service request |
pCR revision of S5-181149 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181389 | pCR 28.530 Adding description and requirements for NSI used to support multiple communication services |
pCR revision of S5-181201 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181390 | Terminology alignment | discussion | Ericsson Limited |
S5-117 AI: 6.4.1 |
withdrawn | [WTS] [JSN] | |||
S5-181391 | pCR to 28.531 MANO role |
pCR revision of S5-181114 |
Cisco Systems Inc. | 28.531 0.2.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181392 | pCR 28.531 Adding requirements for network slice subnet template | pCR | Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
withdrawn | [WTS] [JSN] |
S5-181393 | pCR 28.531 Adding use case and requirements of network slice subnet template information querying |
pCR revision of S5-181155 revised to S5-181461 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181394 | LS on transport support of network slicing management |
LS out LS To: BBF, ETSI ISG NFV, ITU-T SG15 revised to S5-181456 |
Huawei |
S5-117 AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-181395 | pCR 28.531 Add use case and requirements on associating a different network slice subnet template version to a network slice subnet instance | pCR | Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
withdrawn | [WTS] [JSN] |
S5-181396 | pCR draft TS 28.545 Add use case subscription of alarm notifications of NSI |
pCR revision of S5-181184 |
Huawei, ZTE, China Unicom | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
approved | [WTS] [JSN] |
S5-181397 | pCR draft TS 28.545 Add use case subscription of alarm notifications of NSSI |
pCR revision of S5-181188 |
ZTE, Huawei, China Unicom | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
approved | [WTS] [JSN] |
S5-181398 | pCR draft TS 28.545 Add use case get alarmlist from NSMF |
pCR revision of S5-181189 |
ZTE Corporation,China Mobile | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
approved | [WTS] [JSN] |
S5-181399 | pCR draft TS 28.545 Add use case get alarmlist from NSSMF |
pCR revision of S5-181190 |
ZTE Corporation,China Mobile | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
approved | [WTS] [JSN] |
S5-181400 | pCR draft TS 28.545 Add use case acknowledge alarms |
pCR revision of S5-181191 revised to S5-181537 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181401 | pCR draft TS 28.545 Add use case clear alarms |
pCR revision of S5-181192 revised to S5-181538 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181402 | pCR 28.532 Adding new clauses proposal |
pCR revision of S5-181160 |
Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181403 | pCR 28.532 Add procedure of network slice subnet allocation | pCR | Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
withdrawn | [WTS] [JSN] |
S5-181404 | pCR 28.532 Add procedure of network slice allocation |
pCR revision of S5-181157 |
Huawei, Nokia | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181405 | pCR 28.532 Add procedure of coordination with TN Manager | pCR | Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
withdrawn | [WTS] [JSN] |
S5-181406 | pCR 28.532 Adding information model for managednetworkslice and managednetworkslicesubnet |
pCR revision of S5-181158 revised to S5-181528 |
Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181407 | pCR 28 532 Add class diagrams for network slice and network slice subnet |
pCR revision of S5-181167 revised to S5-181524 |
Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181408 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice instance |
pCR revision of S5-181168 revised to S5-181530 |
Huawei, China Unicom, CATR | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181409 | Rel-15 pCR 32.290 Definitions, Symbols and Abbreviations |
pCR revision of S5-181219 |
Huawei | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-181410 | R15 pCR 32.290 Introduce the architecture |
pCR revision of S5-181196 |
China Mobile | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-181411 | Rel-15 pCR 32.290 Addition of section 5 for TS 32.290 |
pCR revision of S5-181221 |
Huawei | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-181412 | Rel-15 pCR 32.290 Addition of section on NF service framework |
pCR revision of S5-181220 |
Huawei | 32.29 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-181413 | Rel-15 pCR 32.291 Protocols aspects | pCR | Huawei | 32.291 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-181414 | Rel-15 pCR 32.291 Update of the skeleton |
pCR revision of S5-181214 |
Huawei | 32.291 0.0.0 | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-181415 | CR Rel-15 32.298 Add CDR parameter for WLAN-based ProSe direct discovery |
CR revision of S5-181089 |
Intel Mobile France | 32.298 15.1.0 CR#6541 catB | ProSe_WLAN_DD-CH | Rel-15 |
S5-117 AI: 7.4.5 |
agreed | [WTS] [JSN] |
S5-181416 | CR Rel-15 32.299 Add Diameter AVP for charging of WLAN-based ProSe direct discovery |
CR revision of S5-181090 |
Intel Mobile France | 32.299 15.1.0 CR#7961 catB | ProSe_WLAN_DD-CH | Rel-15 |
S5-117 AI: 7.4.5 |
agreed | [WTS] [JSN] |
S5-181417 | LS on Addition of AVP code definitions |
LS out LS To: CT4 |
Nokia, Nokia Shanghai Bell |
S5-117 AI: 7.3 |
approved | [WTS] [JSN] | |||
S5-181418 | R15 CR 32.899 Correction on the format of TR 32.899 |
CR revision of S5-181205 |
Huawei | 32.899 15.0.0 CR#11 catD | TEI15 | Rel-15 |
S5-117 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-181419 | Rel-15 CR 32.298 Definition of how IMEI is to be transported in SubscriberEquipmentNumber |
CR revision of S5-181226 |
Ericsson | 32.298 15.1.0 CR#6551 catF | TEI15 | Rel-15 |
S5-117 AI: 7.3 |
agreed | [WTS] [JSN] |
S5-181420 | Draft TS 32.290 | draft TS | Huawei | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] | |
S5-181421 | Draft TS 32.291 | draft TS | Huawei | 5GS_Ph1-SBI_CH | Rel-15 |
S5-117 AI: 7.4.2 |
approved | [WTS] [JSN] | |
S5-181422 | R15 pCR 32.848 Support status of VoLTE service delivery |
pCR revision of S5-181197 |
China Mobile | 32.848 0.3.0 | FS_VBCLTE | Rel-15 |
S5-117 AI: 7.5.1 |
approved | [WTS] [JSN] |
S5-181423 | Draft TR 32.848 | draft TR | China Mobile | FS_VBCLTE | Rel-15 |
S5-117 AI: 7.5.1 |
approved | [WTS] [JSN] | |
S5-181424 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice subnet instance |
pCR revision of S5-181169 revised to S5-181531 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181425 | pCR 28.531 Add use case and requirements on modification of a network slice instance |
pCR revision of S5-181170 revised to S5-181532 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181426 | pCR 28.531 Add use case and requirements on modification of a network slice subnet instance |
pCR revision of S5-181171 revised to S5-181533 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-181427 | Way forward proposal for 5GNRM work item |
discussion revision of S5-181240 |
Nokia, Nokia Shanghai Bell | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
endorsed | [WTS] [JSN] | |
S5-181428 | pCR TS 28.540 Add content of scope |
pCR revision of S5-181241 |
Nokia, Nokia Shanghai Bell | 28.54 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181429 | pCR TS 28.540 Add background and requirements for NG-RAN |
pCR revision of S5-181245 |
Nokia, Nokia Shanghai Bell | 28.54 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181430 | Draft TS 28.540 | draft TS | Nokia | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] | |
S5-181431 | pCR TS 28.541 Add content of scope |
pCR revision of S5-181242 |
Nokia, Nokia Shanghai Bell | 28.541 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181432 | pCR Rel-15 TS 28541 NR NRM IRP |
pCR revision of S5-181107 |
Ericsson Inc. | 28.541 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
merged | [WTS] [JSN] |
S5-181433 | pCR 28.542 Adding NR NRM modelling |
pCR revision of S5-181173 revised to S5-181575 |
Huawei | 28.542 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181434 | pCR TS 28.541 Add class diagrams for NR node in EN-DC |
pCR revision of S5-181247 revised to S5-181540 |
Nokia, Nokia Shanghai Bell | 28.541 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181435 | pCR TS 28.541 Add class definitions for NR node in EN-DC |
pCR revision of S5-181248 |
Nokia, Nokia Shanghai Bell | 28.541 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181436 | Draft TS 28.542 | draft TS | Nokia | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] | |
S5-181437 | pCR TS 28.542 Add background and requirements for 5GC |
pCR revision of S5-181249 |
Nokia, Nokia Shanghai Bell | 28.542 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181438 | pCR TS 28.542 Add background and requirements for AMF Set |
pCR revision of S5-181250 |
Nokia, Nokia Shanghai Bell | 28.542 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181439 | Draft TS 28.543 | draft TS | Nokia | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] | |
S5-181440 | pCR TS 28.543 Add class diagrams for 5GC |
pCR revision of S5-181251 |
Nokia, Nokia Shanghai Bell | 28.543 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181441 | pCR TS 28.543 Add class definitions for 5GC |
pCR revision of S5-181252 |
Nokia, Nokia Shanghai Bell | 28.543 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181442 | Way forward for fault supervision WI |
discussion revision of S5-181235 |
ZTE Corporation |
S5-117 AI: 6.4.4 |
endorsed | [WTS] [JSN] | |||
S5-181443 | pCR 28.545 Add network slice related management functions for fault supervision of network slicing |
pCR revision of S5-181176 revised to S5-181534 |
Huawei | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-181444 | Way forward proposal for MNFV5G WI |
discussion revision of S5-181286 revised to S5-181552 |
Intel K.K. | Rel-15 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] | ||
S5-181445 | Draft CR 28.510 extend the scope to support 5G networks | draftCR | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181446 | Draft CR 28.511 extend the scope to support 5G networks | draftCR | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181447 | Draft CR 28.525 extend the scope to support 5G networks | draftCR | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181448 | Draft CR 28.526 extend the scope to support 5G networks | draftCR | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181449 | pCR 28.525 add a use case of NS instantiation | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181450 | pCR 28.525 add use cases of PNF management - addition, removal, and modification | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181451 | pCR 28.525 add use case of updating transport network requirements of the F1 interface | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181452 | Reply to: LS from SA2 to SA5 on Response on 5G Specification of PSy |
LS out LS is reply to S5-181049 LS To: SA2 |
Nokia |
S5-117 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-181453 | LS to SA2 on clarification of slicing vs network sharing |
LS out LS To: SA2 revised to S5-181529 |
Huawei |
S5-117 AI: 6.4.2 |
revised | [WTS] [JSN] | |||
S5-181454 | TD Rel-15 TD Template for TS specifications for PM FM CM |
discussion revision of S5-181335 revised to S5-181572 |
Ericsson Inc. | Rel-15 |
S5-117 AI: 6.1 |
revised | [WTS] [JSN] | ||
S5-181455 | Reply to: LS from SA3 to SA5 on the status of work on interfaces |
LS out LS is reply to S5-181296 LS To: SA3 revision of S5-181338 |
Huawei |
S5-117 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-181456 | LS on transport support of network slicing management |
LS out LS To: BBF, ETSI ISG NFV, ITU-T SG15 revision of S5-181394 |
Huawei |
S5-117 AI: 6.1 |
approved | [WTS] [JSN] | |||
S5-181457 | Proposed addition of Business level general requirements |
pCR revision of S5-181379 |
ETRI | 28.53 0.3.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181458 | Proposed addition of Business level network slicing management requirements |
pCR revision of S5-181380 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181459 | Proposed Update on Principles of Background and Concepts section |
pCR revision of S5-181377 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181460 | Discussion and proposal for MEC in network slice context |
discussion revision of S5-181352 |
Huawei | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
S5-181461 | pCR 28.531 Adding use case and requirements of network slice subnet template information querying |
pCR revision of S5-181393 |
Huawei | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181462 | pCR 28.526 add a procedure of NS instantiation | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181463 | pCR 28.526 add procedures of PNF addition, modification and removal | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181464 | pCR 28.526 add a procedure of Transport network requirements update | other | Intel K.K. | NETSLICE-MNFV5G | Rel-15 |
S5-117 AI: 6.4.7 |
withdrawn | [WTS] [JSN] | |
S5-181465 | Way forward proposal for TS 28.550 and TS 28.551 |
discussion revision of S5-181088 |
Intel Mobile France | Rel-15 |
S5-117 AI: 6.4.5 |
endorsed | [WTS] [JSN] | ||
S5-181466 | Rel-14 CR 28.510 Scope extension |
CR revised to S5-181553 |
Intel | 28.51 14.1.0 CR#3 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181467 | Rel-14 CR 28.511 Scope extension |
CR revised to S5-181554 |
Intel | 28.511 14.0.0 CR#2 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181468 | Rel-14 CR 28.525 Scope extension |
CR revised to S5-181555 |
Intel | 28.525 14.1.0 CR#4 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181469 | Rel-14 CR 28.526 Scope extension |
CR revised to S5-181556 |
Intel | 28.526 14.0.0 CR#2 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181470 | Rel-14 CR 28.525 use case of NS instantiation |
CR revised to S5-181557 |
Intel | 28.525 14.1.0 CR#5 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181471 | Rel-14 CR 28.525 use cases of PNF addition, removal, and modification |
CR revised to S5-181558 |
Intel | 28.525 14.1.0 CR#6 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181472 | Rel-14 CR 28.525 use case of updating transport network requirements |
CR revised to S5-181559 |
Intel | 28.525 14.1.0 CR#7 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181473 | Rel-14 CR 28.526 procedure of NS instantiation |
CR revised to S5-181560 |
Intel | 28.526 14.0.0 CR#3 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181474 | Rel-14 CR 28.526 procedures of PNF addition, removal, and modification |
CR revised to S5-181561 |
Intel | 28.526 14.0.0 CR#4 catF | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181475 | Rel-14 CR 28.526 procedure of updating transport network requirements |
CR revised to S5-181562 |
Intel | 28.526 14.0.0 CR#5 catB | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-181476 | pCR 28.550 Add description on performance management for 5G networks and network slicing |
pCR revision of S5-181178 |
Huawei, CATR, China Unicom | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
noted | [WTS] [JSN] |
S5-181477 | pCR 28.554 Add classification of end-to-end KPIs for 5G networks and network slicing |
pCR revision of S5-181183 |
Huawei | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181478 | pCR 28.550 Add UC and requirements on reporting performance data of NF |
pCR revision of S5-181079 revised to S5-181541 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181479 | pCR 28.550 Add UC and requirements on creation of measurement job for NSSI |
pCR revision of S5-181080 |
Intel, Huawei, China Mobile, China Unicom | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181480 | pCR 28.550 Add UC and requirements on reporting performance data of 3GPP network |
pCR revision of S5-181081 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181481 | pCR 28.550 Add UC and requirements on creation of measurement job for NSI |
pCR revision of S5-181082 |
Intel, Huawei, China Mobile, China Unicom | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181482 | pCR 28.530 Add principles and update clause 4.8 and 4.9 for 5G network management |
pCR revision of S5-181374 |
Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181483 | LS reply to ITU-T SG5 (Q6/5) on Energy Efficiency |
LS out LS is reply to S5-181052 LS To: ITU-T SG5 (Q6/5) revision of S5-181332 revised to S5-181570 |
Orange Romania | Rel-15 |
S5-117 AI: 6.5.4 |
revised | [WTS] [JSN] | ||
S5-181484 | Rel-15 CR 32.867 editorial correction and supplement |
CR revision of S5-181339 |
Huawei | 32.867 15.0.0 CR#12 catB | TEI15 | Rel-15 |
S5-117 AI: 6.3 |
agreed | [WTS] [JSN] |
S5-181485 | pCR 28.550 Add UC and requirements on creation of measurement job for non-slice-specific 3GPP network |
pCR revision of S5-181083 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181486 | pCR 28.552 Add scope |
pCR revision of S5-181086 |
Intel Mobile France | 28.552 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181487 | LS on measurement of user plane latency |
LS out LS To: RAN2 revised to S5-181551 |
Huawei |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] | |||
S5-181488 | pCR 28.550 on adding use case for measurement of UL and DL user plane delay |
pCR revision of S5-181177 revised to S5-181545 |
Huawei, Telecom Italia, Nokia | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181489 | pCR 28.553 Add scope |
pCR revision of S5-181087 |
Intel Mobile France | 28.553 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181490 | Add new skeleton of 5G End to end Key Performance Indicators (KPI), performance measurements and assurance data |
pCR revision of S5-181229 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181491 | Add use case end-to-end latency measurements of Network Slice instance related KPI |
pCR revision of S5-181236 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181492 | Draft TS 28.304 | draft TS | ORANGE | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] | |
S5-181493 | pCR 28.305 Edithelp comments, merge two operations et al. |
pCR revision of S5-181054 |
Orange Romania | 28.305 1.0.0 | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] |
S5-181494 | Draft TS 28.306 | draft TS | ORANGE | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] | |
S5-181495 | pCR 28.306 Scope and REST solution set for solution 2 |
pCR revision of S5-181055 |
Orange Romania | 28.306 1.0.0 | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] |
S5-181496 | Rel-15 CR 28.623 Add attribute peeParametersList to SS definitions |
CR revision of S5-181057 |
Orange Romania | 28.623 14.1.0 CR#161 catB | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
agreed | [WTS] [JSN] |
S5-181497 | Revised WID Control and monitoring of PEE parameters in RAN |
WID revised revision of S5-181064 |
Orange Romania | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
agreed | [WTS] [JSN] | |
S5-181498 | Add use case for access number of single network slice related KPI |
pCR revision of S5-181237 revised to S5-181547 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181499 | Add use case for IP throughput for one single network slice instance related KPI |
pCR revision of S5-181238 revised to S5-181548 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181500 | Add use case for number of accessed network slice instances for one UE related KPI | pCR | China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-181501 | pCR 28.306 Add OpenAPI solution set descriptions |
pCR revision of S5-181186 |
Huawei | 28.306 1.0.0 | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] |
S5-181502 | pCR 28.404 Use case and requirement for QoE collection |
pCR revision of S5-181187 |
Huawei | 28.404 0.2.0 | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-181503 | Indication of QoE Information Collection |
pCR revision of S5-181262 |
Ericsson | 28.404 0.2.0 | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-181504 | pCR R15 28.405-000 Introduction and scope |
pCR revision of S5-181266 |
Ericsson | 28.405 0.0.0 | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-181505 | pCR R15 28.405-000 Add activation and deactivation for UTRAN |
pCR revision of S5-181267 |
Ericsson | 28.405 0.0.0 | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-181506 | pCR 32.158 Add general rules |
pCR revision of S5-181255 |
Nokia Corporation | 32.158 0.0.0 | REST_SS | Rel-15 |
S5-117 AI: 6.4.11 |
approved | [WTS] [JSN] |
S5-181507 | pCR 32.158 Add design patterns |
pCR revision of S5-181256 |
Nokia Corporation | 32.158 0.0.0 | REST_SS | Rel-15 |
S5-117 AI: 6.4.11 |
approved | [WTS] [JSN] |
S5-181508 | CR 28.707 Requirement for EPC situation | CR | Huawei | 28.707 14.0.0 CR#21 catB | ME_CUPS | Rel-15 |
S5-117 AI: 6.4.12 |
withdrawn | [WTS] [JSN] |
S5-181509 | pCR to 32.857 Introduction Recommendations.doc |
pCR revision of S5-181109 |
Cisco Systems Inc. | 32.857 0.6.0 | FS_OAM_IOT | Rel-15 |
S5-117 AI: 6.5.1 |
approved | [WTS] [JSN] |
S5-181510 | pCR 32.868 Add potential solutions for CM of WT for non-collocated LWA |
pCR revision of S5-181091 |
Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-181511 | pCR 32.868 Add potential solutions for CM of eNB for LWA and LWIP |
pCR revision of S5-181092 |
Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-181512 | Draft TR 32.868 | draft TR | Intel | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
approved | [WTS] [JSN] | |
S5-181513 | pCR 32.868 Add potential solutions for monitoring of RRC procedures for LWA and LWIP |
pCR revision of S5-181096 |
Intel Mobile France | 32.868 0.4.0 | FS_OAM_LWI | Rel-15 |
S5-117 AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-181514 | pCR TR 32.871 adding the concepts of policy conflict detection and resolution |
pCR revision of S5-181217 |
China Mobile Com. Corporation | 32.871 0.4.0 | FS_NETPOL | Rel-15 |
S5-117 AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-181515 | pCR TR 32.972 Potential measurement methods for 5G networks |
pCR revision of S5-181068 |
Orange Romania | 32.972 0.3.0 | FS_EE_5G | Rel-15 |
S5-117 AI: 6.5.4 |
approved | [WTS] [JSN] |
S5-181516 | pCR TR 32.972 Architecture options for EE control framework |
pCR revision of S5-181069 |
Orange Romania | 32.972 0.3.0 | FS_EE_5G | Rel-15 |
S5-117 AI: 6.5.4 |
approved | [WTS] [JSN] |
S5-181517 | 3GPP progress on network slicing - webinar presentation | other | WG Chair |
S5-117 AI: 4.3 |
noted | [WTS] [JSN] | |||
S5-181518 | pCR TR 28.900 – Positioning of ONAP/DCAE wrt. 3GPP reference management architecture |
pCR revision of S5-181128 |
AT&T, Orange | 28.9 0.1.1 | FS_ONAPDCAE | Rel-15 |
S5-117 AI: 6.5.5 |
approved | [WTS] [JSN] |
S5-181519 | pCR TR 28.900 – Communication principles for notifications |
pCR revision of S5-181126 |
AT&T, Orange | 28.9 0.1.1 | FS_ONAPDCAE | Rel-15 |
S5-117 AI: 6.5.5 |
approved | [WTS] [JSN] |
S5-181520 | LS to ONAP - New study on integration of ONAP DCAE and 3GPP management architecture |
LS out LS To: ONAP revision of S5-181131 |
AT&T, Orange | Rel-15 |
S5-117 AI: 6.5.5 |
approved | [WTS] [JSN] | ||
S5-181521 | pCR TS 28.530 Add management support for NRF |
pCR revision of S5-181387 revised to S5-181526 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-181522 | pCR 28.530 Terminology alignment |
pCR revision of S5-181264 |
Ericsson Limited | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181523 | pCR 28.530 Remove section 4.9 |
pCR revision of S5-181261 |
Ericsson Limited,Huawei | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181524 | pCR 28 532 Add class diagrams for network slice and network slice subnet |
pCR revision of S5-181407 |
Huawei | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181525 | OAM&P SWG action list |
other revision of S5-181019 |
WG Vice Chair (Huawei) |
S5-117 AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-181526 | pCR TS 28.530 Add management support for NRF |
pCR revision of S5-181521 |
ETRI | 28.53 0.4.0 | NETSLICE | Rel-15 |
S5-117 AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-181527 | Draft TS 28.532 | draft TS | Huawei | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] | |
S5-181528 | pCR 28.532 Adding information model for managednetworkslice and managednetworkslicesubnet |
pCR revision of S5-181406 |
Huawei, Ericsson | 28.532 0.0.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181529 | LS on alignment of clarification of network slicing and sharing concepts |
LS out LS To: SA2 revision of S5-181453 |
Huawei |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] | |||
S5-181530 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice instance |
pCR revision of S5-181408 |
Huawei, China Unicom, CATR | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181531 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice subnet instance |
pCR revision of S5-181424 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181532 | pCR 28.531 Add use case and requirements on modification of a network slice instance |
pCR revision of S5-181425 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181533 | pCR 28.531 Add use case and requirements on modification of a network slice subnet instance |
pCR revision of S5-181426 |
Huawei, China Unicom | 28.531 0.2.0 | NETSLICE-PRO_NS | Rel-15 |
S5-117 AI: 6.4.2 |
approved | [WTS] [JSN] |
S5-181534 | pCR 28.545 Add network slice related management functions for fault supervision of network slicing |
pCR revision of S5-181443 |
Huawei | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
approved | [WTS] [JSN] |
S5-181535 | Draft TS 28.545 | draft TS | ZTE | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
approved | [WTS] [JSN] | |
S5-181536 | TS quality campaign update |
other revision of S5-181297 |
Ericsson LM |
S5-117 AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-181537 | pCR draft TS 28.545 Add use case acknowledge alarms |
pCR revision of S5-181400 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
approved | [WTS] [JSN] |
S5-181538 | pCR draft TS 28.545 Add use case clear alarms |
pCR revision of S5-181401 |
ZTE Corporation | 28.545 0.0.0 | NETSLICE-FS5G | Rel-15 |
S5-117 AI: 6.4.4 |
approved | [WTS] [JSN] |
S5-181539 | pCR 28.550 Add 5G PM service framework |
pCR revision of S5-181349 |
Intel, Huawei, China Mobile, ZTE, CATR, China Unicom | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181540 | pCR TS 28.541 Add class diagrams for NR node in EN-DC |
pCR revision of S5-181434 |
Nokia, Nokia Shanghai Bell | 28.541 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181541 | pCR 28.550 Add UC and requirements on reporting performance data of NF |
pCR revision of S5-181478 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181542 | Draft TS 28.550 | draft TS | Intel | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-181543 | pCR 28.550 Add scope |
pCR revision of S5-181085 |
Intel Mobile France | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181544 | Draft TS 28.552 | draft TS | Intel | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-181545 | pCR 28.550 on adding use case for measurement of UL and DL user plane delay |
pCR revision of S5-181488 revised to S5-181573 |
Huawei, Telecom Italia, Nokia | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-181546 | Add scope of 5G End to end Key Performance Indicators (KPI), performance measurements and assurance data |
pCR revision of S5-181233 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181547 | Add use case for access number of single network slice related KPI |
pCR revision of S5-181498 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181548 | Add use case for IP throughput for one single network slice instance related KPI |
pCR revision of S5-181499 |
China Mobile E-Commerce Co. | 28.554 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181549 | Draft TS 28.553 | draft TS | Intel | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-181550 | Draft TS 28.554 | draft TS | China Mobile | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-181551 | LS on measurement of user plane latency |
LS out LS To: RAN2 revision of S5-181487 revised to S5-181574 |
Huawei |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] | |||
S5-181552 | Way forward proposal for MNFV5G WI |
discussion revision of S5-181444 |
Intel K.K. | Rel-15 |
S5-117 AI: 6.4.7 |
endorsed | [WTS] [JSN] | ||
S5-181553 | Rel-14 CR 28.510 Scope extension |
CR revision of S5-181466 |
Intel | 28.51 14.1.0 CR#31 catF | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
agreed | [WTS] [JSN] |
S5-181554 | Rel-14 CR 28.511 Scope extension |
CR revision of S5-181467 |
Intel | 28.511 14.0.0 CR#21 catF | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
agreed | [WTS] [JSN] |
S5-181555 | Rel-14 CR 28.525 Scope extension |
CR revision of S5-181468 |
Intel | 28.525 14.1.0 CR#41 catF | OAM14-MAMO_VNF-LCM | Rel-14 |
S5-117 AI: 6.4.7 |
agreed | [WTS] [JSN] |
S5-181556 | Rel-14 CR 28.526 Scope extension |
CR revision of S5-181469 |
Intel | 28.526 14.0.0 CR#21 catF | OAM14-MAMO_VNF-LCM | Rel-14 |
S5-117 AI: 6.4.7 |
agreed | [WTS] [JSN] |
S5-181557 | Rel-14 CR 28.525 use case of NS instantiation |
CR revision of S5-181470 |
Intel | 28.525 14.1.0 CR#51 catF | OAM14-MAMO_VNF-LCM | Rel-14 |
S5-117 AI: 6.4.7 |
agreed | [WTS] [JSN] |
S5-181558 | Rel-14 CR 28.525 use cases of PNF addition, removal, and modification |
CR revision of S5-181471 |
Intel | 28.525 14.1.0 CR#61 catF | OAM14-MAMO_VNF-LCM | Rel-14 |
S5-117 AI: 6.4.7 |
agreed | [WTS] [JSN] |
S5-181559 | Rel-14 CR 28.525 use case of updating transport network requirements |
CR revision of S5-181472 |
Intel | 28.525 14.1.0 CR#71 catF | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
not pursued | [WTS] [JSN] |
S5-181560 | Rel-14 CR 28.526 procedure of NS instantiation |
CR revision of S5-181473 |
Intel | 28.526 14.0.0 CR#31 catF | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
not pursued | [WTS] [JSN] |
S5-181561 | Rel-14 CR 28.526 procedures of PNF addition, removal, and modification |
CR revision of S5-181474 |
Intel | 28.526 14.0.0 CR#41 catF | OAM14-MAMO_VNF-LCM | Rel-14 |
S5-117 AI: 6.4.7 |
agreed | [WTS] [JSN] |
S5-181562 | Rel-14 CR 28.526 procedure of updating transport network requirements |
CR revision of S5-181475 |
Intel | 28.526 14.0.0 CR#51 catF | OAM14-MAMO_VNF-CM | Rel-14 |
S5-117 AI: 6.4.7 |
not pursued | [WTS] [JSN] |
S5-181563 | Draft TS 28.305 | draft TS | ORANGE | PEE_CMON | Rel-15 |
S5-117 AI: 6.4.8 |
approved | [WTS] [JSN] | |
S5-181564 | Draft TS 28.404 | draft TS | Ericsson | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
approved | [WTS] [JSN] | |
S5-181565 | Draft TS 28.405 | draft TS | Ericsson | QOED | Rel-15 |
S5-117 AI: 6.4.9 |
approved | [WTS] [JSN] | |
S5-181566 | Draft TS 32.158 | draft TS | Nokia | REST_SS | Rel-15 |
S5-117 AI: 6.4.11 |
approved | [WTS] [JSN] | |
S5-181567 | Draft TR 32.857 | draft TR | Cisco | FS_OAM_IOT | Rel-15 |
S5-117 AI: 6.5.1 |
approved | [WTS] [JSN] | |
S5-181568 | Draft TR 32.871 | draft TR | China Mobile | FS_NETPOL | Rel-15 |
S5-117 AI: 6.5.3 |
approved | [WTS] [JSN] | |
S5-181569 | Draft TR 32.972 | draft TR | ORANGE | FS_EE_5G | Rel-15 |
S5-117 AI: 6.5.4 |
approved | [WTS] [JSN] | |
S5-181570 | LS reply to ITU-T SG5 (Q6/5) on Energy Efficiency |
LS out LS is reply to S5-181052 LS To: ITU-T SG5 (Q6/5) revision of S5-181483 |
Orange Romania | Rel-15 |
S5-117 AI: 6.5.4 |
approved | [WTS] [JSN] | ||
S5-181571 | Draft TR 28.900 | draft TR | ORANGE | FS_ONAPDCAE | Rel-15 |
S5-117 AI: 6.5.5 |
approved | [WTS] [JSN] | |
S5-181572 | TD Rel-15 TD Template for TS specifications for PM FM CM |
discussion revision of S5-181454 |
Ericsson Inc. | Rel-15 |
S5-117 AI: 6.1 |
endorsed | [WTS] [JSN] | ||
S5-181573 | pCR 28.550 on adding use case for measurement of UL and DL user plane delay |
pCR revision of S5-181545 |
Huawei Technologies, Telecom Italia, Nokia, Deutsche Telecom, China Mobile,Cisco | 28.55 0.0.0 | NETSLICE-ADPM5G | Rel-15 |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-181574 | LS on measurement of user plane latency |
LS out LS To: RAN2 revision of S5-181551 revised to S5-181576 |
Huawei |
S5-117 AI: 6.4.5 |
revised | [WTS] [JSN] | |||
S5-181575 | pCR 28.542 Adding NR NRM modelling |
pCR revision of S5-181433 revised to S5-181577 |
Huawei, Ericsson, Deutsche Telekom | 28.542 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-181576 | LS on measurement of user plane latency |
LS out LS To: RAN2 revision of S5-181574 |
Huawei |
S5-117 AI: 6.4.5 |
approved | [WTS] [JSN] | |||
S5-181577 | pCR 28.542 Adding NR NRM modelling |
pCR revision of S5-181575 |
Ericsson, Huawei, DT | 28.542 0.0.0 | NETSLICE-5GNRM | Rel-15 |
S5-117 AI: 6.4.3 |
approved | [WTS] [JSN] |
S5-181578 | CH Executive Report |
report revision of S5-181041 |
CH SWG Chair |
S5-117 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-181579 | SA5 Meeting Calendar |
other revision of S5-181012 |
WG Chairman |
S5-117 AI: 5.4 |
noted | [WTS] [JSN] | |||
S5-181580 | OAM Executive Report |
report revision of S5-181018 |
WG Vice Chair (Huawei) |
S5-117 AI: 6.1 |
available | [WTS] [JSN] |
581 documents (1.101527929306 seconds)