Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S2-160933 | Draft Agenda for SA WG2#113AH | agenda | SA WG2 Chairman |
S2-ah-17582 AI: 2 |
approved | [WTS] [JSN] | |||
S2-160934 | LS from TSG RAN: LS on S1 signalling solutions for non-NB-IoT UEs |
LS in source LS: RP-152296 LS To: SA WG2, SA WG3, TSG SA, CT WG1, CT WG3, CT WG4, RAN WG2, RAN WG3 revision of S2-160052 revised to S2-161366 |
TSG RAN |
S2-ah-17582 AI: 5.6 |
postponed | [WTS] [JSN] | |||
S2-160935 | LS from TSG RAN: LS on Scenarios and Requirements for Next Generation Access Technologies |
LS in source LS: RPa160083 LS To: SA WG1 |
TSG RAN |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |||
S2-160936 | LS from RAN WG2: Reply LS on questions on CIoT |
LS in source LS: R2-160536 LS To: CT WG1 revision of S2-160486 revised to S2-161367 |
RAN WG2 |
S2-ah-17582 AI: 5.6 |
postponed | [WTS] [JSN] | |||
S2-160937 | LS from RAN WG3: LS on questions on NB-IoT |
LS in source LS: R3-160135 LS To: SA WG2, CT WG1 LS reply in S2-161333, S2-161333 revision of S2-160487 |
RAN WG3 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-160938 | LS from RAN WG3: LS on CIOT optimization |
LS in source LS: R3-160147 LS To: SA WG2, RAN WG2 LS reply in S2-161344, S2-161344 revision of S2-160489 |
RAN WG3 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-160939 | Solution to Key Issue on QoS Framework |
pCR revised to S2-161185 |
ORANGE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160940 | LS from RAN WG3: LS on Release of Control Plane for DONAS |
LS in source LS: R3-160140 LS To: SA WG2 revision of S2-160488 revised to S2-161368 |
RAN WG3 |
S2-ah-17582 AI: 5.6 |
postponed | [WTS] [JSN] | |||
S2-160941 | Work Planning Proposal for NexGen Study Item | discussion | AT&T |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |||
S2-160942 | Key Issue on Policy Framework |
pCR revised to S2-161131 |
AT&T, Sprint, Deutsche Telekom, Orange, China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160943 | Key Issue on Charging |
pCR revised to S2-161132 |
AT&T, Sprint, Deutsche Telekom, Orange | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160944 | Key Issue on Authentication Framework | pCR | AT&T, Sprint, Deutsche Telekom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-160945 | Key issue: Vertical service accommodation | pCR | China Telecom, CATT, Nokia Networks, Samsung, Huawei, KDDI | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-160946 | Key issue: Information storage and management | pCR | China Telecom, CATT, Nokia Networks, Samsung, Huawei | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-160947 | Key issue for signalling aggregation | pCR | KDDI, China Telecom, ZTE, Sprint, China Unicom, Samsung, ETRI | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-160948 | Key issue for Context Awareness to support network elasticity | pCR | KDDI Corporation | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-160949 | DNS Procedure Enhancements for CIoT Optimizations | discussion | Cisco Systems Inc. |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-160950 | DNS Procedure Enhancements for CIoT Optimizations |
draftCR revised to S2-161121 |
Cisco Systems Inc |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-160951 | Solution to key issue 7: Interconnection and Routing Function (IRF) based network function interconnection model |
pCR revised to S2-161181 |
Cisco Systems, Inc., Vodafone, Allot Communications | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160952 | Introduction of Control Plane CIoT EPS optimization for HLcom |
CR revision of S2-160250 |
Sony | 23.401 13.5.0 CR#29621 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
merged | [WTS] [JSN] |
S2-160953 | Clarify the Key issue on network capability exposure |
pCR revised to S2-161136 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160954 | Key issue X: Core Network load re-balancing | pCR | KDDI, Intel, Sprint, ETRI | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-160955 | Solution to Session Management |
pCR revised to S2-161182 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160956 | Solution to Enabling(re)selection of efficient user plane paths | pCR | China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-160957 | Key Issue on enabling unified authentication for network users and subscribers | pCR | ORANGE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-160958 | LS from SA WG1: Reply LS on Scenarios and Requirements for Next Generation Access Technologies |
LS in source LS: S1-160559 LS To: TSG RAN |
SA WG1 |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |||
S2-160959 | Clarification of the Network Slicing key Issue |
pCR revised to S2-161112 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160960 | Routing Non-IP Data to/from Multiple UE Applcaitons and Multiple SCS/AS’s | discussion | Convida Wireless |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-160961 | Proposal for NexGen System Architecture Key Issue for Critical Communications Support |
pCR revised to S2-161137 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160962 | Updating the NIDD Procedures to Support Multiple Applicaitons | draftCR | Convida Wireless |
S2-ah-17582 AI: 5.6 |
available | [WTS] [JSN] | |||
S2-160963 | Proposal for NexGen System Architecture Key Issue Concerning Advanced Group Communication |
pCR revised to S2-161139 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160964 | Proposal for NexGen System Architecture Key Issue Concerning Advanced Off-Network Communication |
pCR revised to S2-161140 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160965 | Session management functional baseline |
pCR revised to S2-161183 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160966 | Assumptions for Core and Access functional allocation |
pCR revised to S2-161104 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160967 | Key issue: 3GPP architecture impacts to support logical CN/RAN split |
pCR revised to S2-161141 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160968 | Introducing support for Non-IP data for CIoT |
draftCR revision of S2-160841 revised to S2-161163 |
Ericsson ( Cisco Systems Inc, Intel, ZTE) |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-160969 | Introduction of non-IP data delivery via the SCEF for cellular IoT |
draftCR revision of S2-160832 revised to S2-161164 |
Ericsson, Intel?, Cisco Systems Inc?, AT&T?, LG Electronics?, Samsung? |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-160970 | Disabling IRAT mobility to and from NB-IOT | CR | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | 23.401 13.5.0 CR#2980 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-160971 | Support for overload control | CR | Ericsson | 23.401 13.5.0 CR#2981 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-160972 | Introduction of Control Plane CIoT EPS optimization |
draftCR revision of S2-160909 |
Ericsson |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-160973 | TAU procedure update for CIoT EPS Optimisation |
draftCR revision of S2-160837 revised to S2-161202 |
Ericsson |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-160974 | Introduction of attach procedure changes for CIoT EPS optimization |
draftCR revision of S2-160836 revised to S2-161152 |
Ericsson |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-160975 | Introduction of support for NB-IoT |
draftCR revision of S2-160907 revised to S2-161124 |
Ericsson |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-160976 | UE Capability Handling for Control Plane CIoT EPS optimization |
draftCR revision of S2-160769 |
Ericsson |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-160977 | EMM signalling for indicating SMS | discussion | Ericsson |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-160978 | SMS support with EPS attach and TAU |
CR revised to S2-161348 |
Ericsson | 23.272 13.2.0 CR#961 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-160979 | Applicability of UP EPS Optimization for TAU, SMS and communication with SCEF | discussion | Ericsson |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-160980 | Architectural requirements, assumptions and principles impact on key issue descriptions |
pCR revised to S2-161105 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160981 | Update of the definitions | pCR | Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-160982 | Levels of mobility support for mobility management |
pCR revised to S2-161145 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160983 | Baseline mobility solution for evolved LTE and 5G RATs |
pCR revised to S2-161199 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160984 | Solution for optimized UE sleep state and state transitions |
pCR revised to S2-161198 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160985 | Key issue: Base functions for a QoS framework |
pCR revised to S2-161186 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160986 | Update of the key issue 'support of network slicing' |
pCR revised to S2-161129 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160987 | RAN related requirements for support of e2e network slicing | pCR | Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-160988 | Multiple network slices per UE |
pCR revised to S2-161190 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160989 | Network slice selection |
pCR revised to S2-161130 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160990 | Congestion Control for Mobility/Session Management |
pCR revised to S2-161135 |
InterDigital | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160991 | New key issue for NexGen core impacts on IMS |
pCR revised to S2-161142 |
LG Electronics, Telecom Italia, Deutsche Telekom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160992 | Adding conclusions for the key issue #6 and #7 in TR 23.720 |
pCR revised to S2-161156 |
Intel | 23.72 1.2.0 | FS_AE_CIoT |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |
S2-160993 | Presentation of TR 23.720 version 1.3.0 to TSG SA for Approval |
TS or TR cover revised to S2-161157 |
Intel |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-160994 | Introduction of Control Plane CIoT EPS optimization | draftCR | Intel |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-160995 | Lawful Interception related issues and initial concerns for Network Slicing | discussion | OTD |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |||
S2-160996 | Update to the key issue of network slicing | pCR | CATT | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-160997 | Definition of scale-in/scale-out |
pCR revised to S2-161102 |
CATT | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-160998 | Draft CR23.401 [2948r8] Removal of "WB-E-UTRA" terminology | draftCR | MediaTek, Alcatel-Lucent, Nokia Networks |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-160999 | Draft CR 23.401 [2942r11] Removal of "WB-E-UTRA" terminology | draftCR | MediaTek, Alcatel-Lucent, Nokia Networks |
S2-ah-17582 AI: 5.6 |
available | [WTS] [JSN] | |||
S2-161000 | Draft CR 23.401 [2959r3] Removal of "WB-E-UTRA" terminology | draftCR | MediaTek, Alcatel-Lucent, Nokia Networks |
S2-ah-17582 AI: 5.6 |
available | [WTS] [JSN] | |||
S2-161001 | Draft CR 23.401 [2951r8] Removal of "WB-E-UTRA" terminology | draftCR | MediaTek, Alcatel-Lucent, Nokia Networks |
S2-ah-17582 AI: 5.6 |
available | [WTS] [JSN] | |||
S2-161002 | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core |
pCR revised to S2-161200 |
ZTE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161003 | Clarification of Network Slicing Key Issue for isolation and separation between network slice instances | pCR | ZTE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-161004 | Clarification of Multi Access Technologies Support by 5G Core |
pCR revised to S2-161106 |
ZTE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161005 | Update HSS/HLR functionality to support non-IP data delivery via SCEF | CR | Samsung | 23.682 13.4.0 CR#165 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161006 | Solution for “Key issue on Network Function Granularity and Interconnection between them” | pCR | Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-161007 | [DRAFT] Reply LS on CIOT optimization |
response revised to S2-161118 |
Samsung R&D Institute UK |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161008 | Solution: Mobility Framework |
pCR revised to S2-161196 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161009 | Solution: Network Slicing |
pCR revised to S2-161193 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161010 | Solution: QoS Framework |
pCR revised to S2-161188 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161011 | Architecture Requirements for non-IP connectivity and services |
pCR revised to S2-161107 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161012 | Key issue: Identities | pCR | Nokia Networks, Alcatel-Lucent | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-161013 | HLcom feature update for CP optimisation | CR | Huawei, Hisilicon | 23.401 13.5.0 CR#2982 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161014 | HLcom update for CIoT CP optimisation | CR | Huawei, Hisilicon | 23.682 13.4.0 CR#166 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161015 | Bearer deactivation with Control Plane CIoT optimisation | CR | Huawei, Hisilicon | 23.401 13.5.0 CR#2983 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] |
S2-161016 | Policy Framework | pCR | Huawei, Hisilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-161017 | Terminology related to the Next Generation System |
pCR revised to S2-161101 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161018 | Solutions for key issue 1- Support of Network Slicing |
pCR revised to S2-161194 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161019 | Solution for the discovery of Network Functions | pCR | Huawei, HiSilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-161020 | Considerations for Session Continuity | pCR | Motorola Mobility, Lenovo | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-161021 | UE Capability Handling for Control Plane CIoT EPS optimization | draftCR | ZTE |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161022 | Introduction of attach procedure changes for CIoT EPS optimization. |
draftCR revised to S2-161207 |
ZTE |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161023 | TAU procedure update for CIoT EPS Optimisation |
draftCR revised to S2-161203 |
ZTE |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161024 | Introduction of support for NB-IoT | draftCR | ZTE |
S2-ah-17582 AI: 5.6 |
merged | [WTS] [JSN] | |||
S2-161025 | Introduction of Control Plane CIoT EPS optimization |
draftCR revised to S2-161169 |
ZTE |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161026 | Solution: ConnectionLess RAN-Core Interface | pCR | Alcatel-Lucent | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-161027 | Analysis of TAU procedure handling for solution 18 | discussion | LG Electronics |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161028 | TAU procedure update for CIoT EPS Optimization | draftCR | LG Electronics |
S2-ah-17582 AI: 5.6 |
available | [WTS] [JSN] | |||
S2-161029 | Removal of the Non-IP indication in step 17 of Attach procedure | draftCR | Huawei, HiSilicon |
S2-ah-17582 AI: 5.6 |
withdrawn | [WTS] [JSN] | |||
S2-161030 | Key Issue on Relay UE in mIoT scenario | pCR | Huawei | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-161031 | Key issue: Mobility framework provides facilities to support service continuity in NexGen architecture | pCR | Huawei | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-161032 | Relation of EPC and NexGen core to the RAN architecture: Discussion | discussion | NTT DOCOMO, KDDI |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |||
S2-161033 | Relation of EPC and NexGen core to the RAN architecture: pCR to High level architectural requirements |
pCR revised to S2-161103 |
NTT DOCOMO, KDDI | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161034 | Key Issues on low latency and high reliability service support |
pCR revised to S2-161138 |
Huawei, HiSilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161035 | Architecture requirement for leveraging database technology |
pCR revised to S2-161108 |
Huawei, HiSilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161036 | 3GPP system aspects to support the connectivity via a relay UE |
pCR revised to S2-161144 |
LG Electronics, Sony Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161037 | Session management decoupled with attachment | pCR | LG Electronics | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-161038 | Migration solution for next generation core with NAS | pCR | LG Electronics | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-161039 | Key issue on 3GPP architecture impacts to reduce power consumption of a device | pCR | LG Electronics | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-161040 | Key issue on 3GPP architecture impacts to support unified network discovery and selection |
pCR revised to S2-161178 |
LG Electronics | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161041 | Authentication in NextGen core network: key issue |
pCR revised to S2-161133 |
Huawei, HiSilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161042 | Key Issue on Interworking and Migration |
pCR revised to S2-161179 |
NTT DOCOMO, Intel, Nokia | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161043 | Solution to support a UE with simultaneous connections to multiple Network Slices |
pCR revised to S2-161191 |
NTT DOCOMO | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161044 | Key Issue on Integration of 3GPP NexGen RAT with NexGen Core | pCR | NTT DOCOMO, Nokia, Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-161045 | Introduction of attach procedure changes for CIoT EPS optimization |
draftCR revision of S2-160836 |
Huawei, HiSilicon |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161046 | Introduction of Control Plane CIoT EPS optimization |
CR revision of S2-160909 |
Alcatel-lucent, MediaTek, NEC, Intel,Qualcomm; Nokia Networks, Cisco Systems Inc., Huawei | 23.401 13.5.0 CR#294212 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161047 | EPS Bearer support for NB-IoT | discussion | Huawei, HiSilicon |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161048 | One Bearer Support for NB-IoT | CR | Huawei, Hisilicon | 23.401 13.5.0 CR#2984 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161049 | Issues on enable CP & UP for one EPS bearer | discussion | Huawei, HiSilicon |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161050 | RAU procedure update for CIoT EPS Optimisation | CR | Huawei, HiSilicon | 23.401 13.5.0 CR#2985 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161051 | TAU procedure update with Gn/Gp SGSN for CIoT EPS optimization | CR | Huawei, HiSilicon | 23.401 13.5.0 CR#2986 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161052 | On the support of QoS and data/signalling differentiation in CIOT Optimisations | discussion | Alcatel-Lucent, Nokia Networks |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161053 | Non-roaming baseline architecture |
pCR revised to S2-161748 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-161054 | Key Issue on Interworking and Migration | pCR | Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-161055 | Solution to Key Issue on QoS Framework | pCR | Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
merged | [WTS] [JSN] | |
S2-161056 | Solution to Key Issue on minimising access dependencies |
pCR revised to S2-161733 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-161057 | Solution to Key Issue on Mobility Framework |
pCR revised to S2-161197 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161058 | Reply LS on Clarifications on RRC Resume Request |
LS out LS To: SA WG3, RAN WG2 revised to S2-161119 |
Qualcomm Incorporated |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161059 | Updates on the attach procedure for RoHC | draftCR | Qualcomm Incorporated, Intel |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161060 | Updates on the CP optimisation for RoHC | draftCR | Qualcomm Incorporated, Intel |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161061 | Updates on the TAU procedure for RoHC |
draftCR revised to S2-161149 |
Qualcomm Incorporated, Intel |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161062 | Core Network node selection for CIOT | discussion | Qualcomm Incorporated |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161063 | CIoT EPS Optimisation RRC indication and MME node selection | CR | Qualcomm Incorporated | 23.401 13.5.0 CR#2987 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161064 | 5G Architectural requirement for energy efficiency |
pCR revision of S2-160815 revised to S2-161109 |
Orange, Samsung | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161065 | CN selection for CIoT | discussion | Ericsson |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161066 | Some technical corrections and clarifications to CIOT CRs | discussion | NTT DOCOMO |
S2-ah-17582 AI: 5.6 |
available | [WTS] [JSN] | |||
S2-161067 | Response to LS on Clarifications on RRC Resume Request | response | Ericsson LM |
S2-ah-17582 AI: 5.6 |
withdrawn | [WTS] [JSN] | |||
S2-161068 | Key issue on scaling and virtualization support |
pCR revised to S2-161134 |
Cisco, Telecom Italia | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161069 | SA WG2 Work Planning Worksheet |
other revised to S2-161244 |
SA WG2 Chairman |
S2-ah-17582 AI: 7.2 |
revised | [WTS] [JSN] | |||
S2-161070 | Update to Key Issue 6 |
pCR revised to S2-161146 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161071 | Introduction of attach procedure changes for CIoT EPS optimization. |
draftCR revised to S2-161208 |
NTT DOCOMO INC. |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161072 | Solution for Key Issue 4 on Session Management |
pCR revised to S2-161184 |
Qualcomm Incorporated | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161073 | Solution for Traffic identification for key issue 2 on Qos Framework |
pCR revised to S2-161189 |
Qualcomm Incorporated | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161074 | Discussion paper on definition of NexGen architecture | discussion | Qualcomm Incorporated |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |||
S2-161075 | Architectural assumptions for NexGen |
pCR revised to S2-161110 |
Qualcomm Incorporated | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161076 | Key Issue on Traffic Anchoring and Splitting |
pCR revision of S2-160330 |
Qualcomm Incorporated | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-161077 | MTU for non-IP PDN connection |
CR revised to S2-161792 |
Vodafone | 23.06 13.5.0 CR#1999 catB | Rel-13 |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |
S2-161078 | Introduction of non-IP data delivery via the SCEF for cellular IoT |
draftCR revised to S2-161165 |
Alcatel-Lucent, Nokia Networks, Cisco Systems Inc, Samsung, Intel |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161079 | Handling of signalling conflicts with 'data via MME' | discussion | Vodafone |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161080 | SCEF Issues | discussion | Alcatel-lucent, Nokia Networks |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161081 | Solutions for Key Issue 1 (Support of Network Slicing) |
pCR revised to S2-161192 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161082 | Baseline solution for service continuity with IP anchor relocation |
pCR revised to S2-161802 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-161083 | prioritisation of signalling and data aspects - update of CR 2942 |
draftCR revised to S2-161155 |
Vodafone |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161084 | What is access independence? | pCR | Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
available | [WTS] [JSN] | |
S2-161085 | Some QoS Aspects of Data via MME | discussion | Vodafone |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161086 | Proposal for NexGen System Architecture Key Issue Concerning Top-Down NexGen Architecture Characterization |
pCR revised to S2-161180 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161087 | NB-IoT AMBR aspects in PDN Connection request procedure - update of CR2942 |
draftCR revised to S2-161154 |
Vodafone |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161088 | LS from SA WG3: LS on Clarifications on RRC Resume Request |
LS in source LS: S3-160337 LS To: RAN WG2, SA WG2 LS reply in S2-161260, S2-161260 |
SA WG3 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-161089 | Architectural Requirements to Key issue: Support of Network Slicing |
pCR revised to S2-161111 |
ITRI | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161090 | LS from CT WG1: Response to LS on NB-IoT work progress in RAN WG2 |
LS in source LS: C1-161187 LS To: RAN WG2, SA WG2 revised to S2-161369 |
CT WG1 |
S2-ah-17582 AI: 5.6 |
postponed | [WTS] [JSN] | |||
S2-161091 | LS from CT WG1: LS on per-UE configuration to allow exception reporting |
LS in source LS: C1-161430 LS To: RAN WG2 LS reply in S2-161331, S2-161331 |
CT WG1 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-161092 | LS from CT WG1: Existence of CIoT support and NAS protocol details for CIoT |
LS in source LS: C1-161544 LS To: RAN WG2, RAN WG3, SA WG2 LS reply in S2-161345, S2-161345 |
CT WG1 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-161093 | LS from CT WG4: LS on the SGW/PGW Selection |
LS in LS To: SA WG2 LS reply in S2-161346, S2-161346 |
CT WG4 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-161094 | LS from CT WG4: LS on Non IP Data Delivery procedures |
LS in source LS: C4-161535 LS To: SA WG2 LS reply in S2-161347, S2-161347 |
CT WG4 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-161095 | Handover for non-NB-IoT devices using CIoT optimisations | CR | Vodafone | 23.401 13.5.0 CR#2988 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161096 | LS from RAN WG2: LS on paging in NB-IoT |
LS in source LS: R2-161948 LS To: RAN WG3, SA WG2, CT WG1 LS reply in S2-161330, S2-161330 |
RAN WG2 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-161097 | LS from RAN WG2: LS on CIoT optimization for non-NB-IoT UEs |
LS in source LS: R2-162018 LS To: SA WG2 LS reply in S2-161352, S2-161352 |
RAN WG2 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-161098 | LS from RAN WG2: Reply LS on Clarifications on RRC Resume Request |
LS in source LS: R2-162019 LS To: SA WG3 revised to S2-161370 |
RAN WG2 |
S2-ah-17582 AI: 5.6 |
postponed | [WTS] [JSN] | |||
S2-161099 | LS from RAN WG2: Response to LS on NB-IoT work progress in RAN2 |
LS in source LS: R2-162020 LS To: CT WG1 LS reply in S2-161331 |
RAN WG2 |
S2-ah-17582 AI: 5.6 |
replied to | [WTS] [JSN] | |||
S2-161100 | Work Planning Proposal for NexGen Study Item on how to focus study |
discussion revised to S2-161128 |
AT&T |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |||
S2-161101 | Terminology related to the Next Generation System |
pCR revision of S2-161017 revised to S2-161231 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161102 | Definition of scale-in/scale-out |
pCR revision of S2-160997 |
CATT | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-161103 | Relation of EPC and NexGen core to the RAN architecture: pCR to High level architectural requirements |
pCR revision of S2-161033 |
NTT DOCOMO, KDDI | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-161104 | Assumptions for Core and Access functional allocation |
pCR revision of S2-160966 revised to S2-161232 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161105 | Architectural requirements, assumptions and principles impact on key issue descriptions |
pCR revision of S2-160980 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161106 | Clarification of Multi Access Technologies Support by 5G Core |
pCR revision of S2-161004 revised to S2-161233 |
ZTE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161107 | Architecture Requirements for non-IP connectivity and services |
pCR revision of S2-161011 revised to S2-161234 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161108 | Architecture requirement for leveraging database technology |
pCR revision of S2-161035 |
Huawei, HiSilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-161109 | 5G Architectural requirement for energy efficiency |
pCR revision of S2-161064 revised to S2-161235 |
Orange, Samsung | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161110 | Architectural assumptions for NexGen |
pCR revision of S2-161075 revised to S2-161236 |
Qualcomm Incorporated | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161111 | Architectural Requirements to Key issue: Support of Network Slicing |
pCR revision of S2-161089 |
ITRI | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-161112 | Clarification of the Network Slicing key Issue |
pCR revision of S2-160959 revised to S2-161237 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161113 | [DRAFT] Reply to LS on paging in NB-IoT |
LS out LS To: RAN WG2 revised to S2-161279 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161114 | DRX handling for NB-IoT | CR | Vodafone | 23.401 13.5.0 CR#2989 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161115 | [DRAFT] Reply to S on CIoT optimization for non-NB-IoT UEs |
LS out LS To: RAN WG2 revised to S2-161176 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161116 | [DRAFT] Reply to esponse to LS on NB-IoT work progress in RAN WG2 |
LS out LS To: RAN WG2, CT WG1 revised to S2-161173 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161117 | [DRAFT] Reply to LS on questions on NB-IoT |
LS out LS To: RAN WG3, CT WG1 revised to S2-161333 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161118 | [DRAFT] Reply LS on CIOT optimization |
LS out LS To: RAN WG3, RAN WG2 revision of S2-161007 revised to S2-161177 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161119 | Reply LS on Clarifications on RRC Resume Request |
LS out LS To: SA WG3 revision of S2-161058 revised to S2-161260 |
Qualcomm Incorporated |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161120 | [DRAFT] Reply to Existence of CIoT support and NAS protocol details for CIoT |
LS out LS To: CT WG1, RAN WG2, RAN WG3 revised to S2-161335 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161121 | DNS Procedure Enhancements for CIoT Optimizations |
draftCR revision of S2-160950 revised to S2-161215 |
Cisco Systems Inc |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161122 | [DRAFT] Reply to LS on the SGW/PGW Selection |
LS out LS To: CT WG4 revised to S2-161171 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161123 | CIoT EPS Optimisation RRC indication and MME node selection | CR | Qualcomm Incorporated | 23.401 13.5.0 CR#29871 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161124 | Introduction of support for NB-IoT |
draftCR revision of S2-160975 revised to S2-161229 |
Ericsson |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161125 | HLcom feature update for CP optimisation | CR | Huawei, Hisilicon | 23.401 13.5.0 CR#29821 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161126 | HLcom update for CIoT CP optimisation | CR | Huawei, Hisilicon | 23.682 13.4.0 CR#1661 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161127 | Support for overload control | CR | Ericsson | 23.401 13.5.0 CR#29811 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161128 | Work Planning Proposal for NexGen Study Item on how to focus study |
discussion revision of S2-161100 revised to S2-161245 |
AT&T |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |||
S2-161129 | Update of the key issue 'support of network slicing' |
pCR revision of S2-160986 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161130 | Network slice selection |
pCR revision of S2-160989 revised to S2-161281 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161131 | Key Issue on Policy Framework |
pCR revision of S2-160942 revised to S2-161238 |
AT&T, Sprint, Deutsche Telekom, Orange, China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161132 | Key Issue on Charging |
pCR revision of S2-160943 revised to S2-161239 |
AT&T, Sprint, Deutsche Telekom, Orange | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161133 | Authentication in NextGen core network: key issue |
pCR revision of S2-161041 revised to S2-161240 |
Huawei, HiSilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161134 | Key issue on scaling and virtualization support |
pCR revision of S2-161068 revised to S2-161270 |
Cisco, Telecom Italia | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161135 | Congestion Control for Mobility/Session Management |
pCR revision of S2-160990 |
InterDigital | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161136 | Clarify the Key issue on network capability exposure |
pCR revision of S2-160953 revised to S2-161241 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161137 | Proposal for NexGen System Architecture Key Issue for Critical Communications Support |
pCR revision of S2-160961 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161138 | Key Issues on low latency and high reliability service support |
pCR revision of S2-161034 |
Huawei, HiSilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161139 | Proposal for NexGen System Architecture Key Issue Concerning Advanced Group Communication |
pCR revision of S2-160963 revised to S2-161293 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161140 | Proposal for NexGen System Architecture Key Issue Concerning Advanced Off-Network Communication |
pCR revision of S2-160964 revised to S2-161294 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161141 | Key issue: 3GPP architecture impacts to support logical CN/RAN split |
pCR revision of S2-160967 revised to S2-161242 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161142 | New key issue for NexGen core impacts on IMS |
pCR revision of S2-160991 revised to S2-161243 |
LG Electronics, Telecom Italia, Deutsche Telekom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161143 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161144 | 3GPP system aspects to support the connectivity via a relay UE |
pCR revision of S2-161036 revised to S2-161247 |
LG Electronics, Sony Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161145 | Levels of mobility support for mobility management |
pCR revision of S2-160982 revised to S2-161278 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161146 | Update to Key Issue 6 |
pCR revision of S2-161070 revised to S2-161271 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161147 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161148 | Key issue: Base functions for a QoS framework | pCR | Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-161149 | Updates on the TAU procedure for RoHC |
draftCR revision of S2-161061 |
Qualcomm Incorporated, Intel |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161150 | [DRAFT] Reply LS on Non IP Data Delivery procedures |
LS out LS To: CT WG4 revised to S2-161172 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161151 | Disabling IRAT mobility to and from NB-IOT | CR | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | 23.401 13.5.0 CR#29801 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161152 | Introduction of attach procedure changes for CIoT EPS optimization |
draftCR revision of S2-160974 revised to S2-161221 |
Ericsson |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161153 | One Bearer Support for NB-IoT | CR | Huawei, Hisilicon | 23.401 13.5.0 CR#29841 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
withdrawn | [WTS] [JSN] |
S2-161154 | NB-IoT AMBR aspects in PDN Connection request procedure - update of CR2942 |
draftCR revision of S2-161087 revised to S2-161230 |
Vodafone |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161155 | prioritisation of signalling and data aspects - update of CR 2942 |
draftCR revision of S2-161083 revised to S2-161174 |
Vodafone |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161156 | Adding conclusions for the key issue #6 and #7 in TR 23.720 |
pCR revision of S2-160992 |
Intel | 23.72 1.2.0 | FS_AE_CIoT |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |
S2-161157 | Presentation of TR 23.720 version 1.3.0 to TSG SA for Approval |
TS or TR cover revision of S2-160993 |
Intel |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161158 | Introduction of non-IP data delivery via the SCEF for cellular IoT | CR | Intel, Cisco Systems Inc, AT&T, LG Electronics, Samsung, Alcatel-Lucent, Ericsson, NEC, ZTE | 23.682 13.4.0 CR#1603 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161159 | Introducing support for Non-IP data for CIoT | CR | Ericsson, Cisco Systems Inc, Intel, ZTE | 23.401 13.5.0 CR#29348 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161160 | Introduction of attach procedure changes for CIoT EPS optimization. | CR | Alcatel-lucent, Vodafone, Qualcomm; Nokia Networks, Cisco Systems Inc., Huawei, China Mobile, Intel, ZTE | 23.401 13.5.0 CR#29519 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161161 | TAU procedure update for CIoT EPS Optimisation | CR | Huawei,HiSilicon, Intel, ZTE | 23.401 13.5.0 CR#29594 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161162 | Introduction of support for NB-IoT | CR | Vodafone, Nokia Networks, Intel | 23.401 13.5.0 CR#29488 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161163 | Introducing support for Non-IP data for CIoT |
draftCR revision of S2-160968 |
Ericsson ( Cisco Systems Inc, Intel, ZTE) |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161164 | Introduction of non-IP data delivery via the SCEF for cellular IoT |
draftCR revision of S2-160969 revised to S2-161217 |
Ericsson, Intel?, Cisco Systems Inc?, AT&T?, LG Electronics?, Samsung? |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161165 | Introduction of non-IP data delivery via the SCEF for cellular IoT |
draftCR revision of S2-161078 revised to S2-161218 |
Alcatel-Lucent, Nokia Networks, Cisco Systems Inc, Samsung, Intel |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161166 | Update HSS/HLR functionality to support non-IP data delivery via SCEF | CR | Samsung | 23.682 13.4.0 CR#1651 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161167 | Introduction of solution 18 - suspend and resume procedure | CR | Ericsson, Alcatel-Lucent, Sony, Nokia Networks | 23.401 13.5.0 CR#29309 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161168 | UE Capability Handling for Control Plane CIoT EPS optimization | CR | Vodafone | 23.401 13.5.0 CR#29772 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161169 | Introduction of Control Plane CIoT EPS optimization |
draftCR revision of S2-161025 revised to S2-161214 |
ZTE |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161170 | Introduction of Control Plane CIoT EPS optimization | CR | Alcatel-lucent, MediaTek, NEC, Intel,Qualcomm; Nokia Networks, Cisco Systems Inc., Huawei,ZTE | 23.401 13.5.0 CR#294213 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161171 | [DRAFT] Reply to LS on the SGW/PGW Selection |
LS out LS To: CT WG4 revision of S2-161122 revised to S2-161210 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161172 | [DRAFT] Reply LS on Non IP Data Delivery procedures |
LS out LS To: CT WG4 revision of S2-161150 revised to S2-161209 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161173 | [DRAFT] Reply to esponse to LS on NB-IoT work progress in RAN WG2 |
LS out LS To: RAN WG2, CT WG1 revision of S2-161116 revised to S2-161331 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161174 | prioritisation of signalling and data aspects - update of CR 2942 |
draftCR revision of S2-161155 revised to S2-161250 |
Vodafone |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161175 | DRX handling for NB-IoT | CR | Vodafone | 23.401 13.5.0 CR#29891 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161176 | [DRAFT] Reply to S on CIoT optimization for non-NB-IoT UEs |
LS out LS To: RAN WG2 revision of S2-161115 revised to S2-161332 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161177 | [DRAFT] Reply LS on CIOT optimization |
LS out LS To: RAN WG3, RAN WG2 revision of S2-161118 revised to S2-161334 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161178 | Key issue on 3GPP architecture impacts to support unified network discovery and selection |
pCR revision of S2-161040 revised to S2-161248 |
LG Electronics | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161179 | Key Issue on Interworking and Migration |
pCR revision of S2-161042 revised to S2-161249 |
NTT DOCOMO, Intel, Nokia | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161180 | Proposal for NexGen System Architecture Key Issue Concerning Top-Down NexGen Architecture Characterization |
pCR revision of S2-161086 revised to S2-161272 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161181 | Solution to key issue 7: Interconnection and Routing Function (IRF) based network function interconnection model |
pCR revision of S2-160951 revised to S2-161274 |
Cisco Systems, Inc., Vodafone, Allot Communications | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161182 | Solution to Session Management |
pCR revision of S2-160955 revised to S2-161299 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161183 | Session management functional baseline |
pCR revision of S2-160965 revised to S2-161275 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161184 | Solution for Key Issue 4 on Session Management |
pCR revision of S2-161072 |
Qualcomm Incorporated | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-161185 | Solution to Key Issue on QoS Framework |
pCR revision of S2-160939 revised to S2-161280 |
ORANGE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161186 | Key issue: Base functions for a QoS framework |
pCR revision of S2-160985 revised to S2-161246 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161187 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161188 | Solution: QoS Framework |
pCR revision of S2-161010 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-161189 | Solution for Traffic identification for key issue 2 on Qos Framework |
pCR revision of S2-161073 |
Qualcomm Incorporated | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-161190 | Multiple network slices per UE |
pCR revision of S2-160988 revised to S2-161284 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161191 | Solution to support a UE with simultaneous connections to multiple Network Slices |
pCR revision of S2-161043 revised to S2-161285 |
NTT DOCOMO | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161192 | Solutions for Key Issue 1 (Support of Network Slicing) |
pCR revision of S2-161081 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-161193 | Solution: Network Slicing |
pCR revision of S2-161009 revised to S2-161282 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161194 | Solutions for key issue 1- Support of Network Slicing |
pCR revision of S2-161018 revised to S2-161283 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161195 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161196 | Solution: Mobility Framework |
pCR revision of S2-161008 revised to S2-161276 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161197 | Solution to Key Issue on Mobility Framework |
pCR revision of S2-161057 revised to S2-161321 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161198 | Solution for optimized UE sleep state and state transitions |
pCR revision of S2-160984 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161199 | Baseline mobility solution for evolved LTE and 5G RATs |
pCR revision of S2-160983 revised to S2-161277 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161200 | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core |
pCR revision of S2-161002 revised to S2-161286 |
ZTE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161201 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161202 | TAU procedure update for CIoT EPS Optimisation |
draftCR revision of S2-160973 |
Ericsson |
S2-ah-17582 AI: 5.6 |
withdrawn | [WTS] [JSN] | |||
S2-161203 | TAU procedure update for CIoT EPS Optimisation |
draftCR revision of S2-161023 revised to S2-161223 |
ZTE |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161204 | RAU procedure update for CIoT EPS Optimisation | CR | Huawei,HiSilicon | 23.401 13.5.0 CR#29851 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161205 | TAU procedure update with Gn/Gp SGSN for CIoT EPS optimization | CR | Huawei, HiSilicon | 23.401 13.5.0 CR#29861 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161206 | Handover for non-NB-IoT devices using CIoT optimisations | CR | Vodafone | 23.401 13.5.0 CR#29881 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161207 | Introduction of attach procedure changes for CIoT EPS optimization. |
draftCR revision of S2-161022 revised to S2-161256 |
ZTE |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161208 | Introduction of attach procedure changes for CIoT EPS optimization. |
draftCR revision of S2-161071 revised to S2-161227 |
NTT DOCOMO INC. |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161209 | [DRAFT] Reply LS on Non IP Data Delivery procedures |
LS out LS To: CT WG4 revision of S2-161172 revised to S2-161337 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
withdrawn | [WTS] [JSN] | |||
S2-161210 | [DRAFT] Reply to LS on the SGW/PGW Selection |
LS out LS To: CT WG4 revision of S2-161171 revised to S2-161336 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161211 | Disabling IRAT mobility to and from NB-IOT | CR | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | 23.401 13.5.0 CR#29802 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161212 | HLcom feature update for CP optimisation | CR | Huawei, Hisilicon, Sony | 23.401 13.5.0 CR#29822 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161213 | Introduction of solution 18 - suspend and resume procedure | CR | Ericsson, Alcatel-Lucent, Sony, Nokia Networks | 23.401 13.5.0 CR#293010 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161214 | Introduction of Control Plane CIoT EPS optimization |
draftCR revision of S2-161169 revised to S2-161226 |
ZTE |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161215 | DNS Procedure Enhancements for CIoT Optimizations |
draftCR revision of S2-161121 |
Cisco Systems Inc |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161216 | CIoT EPS Optimisation RRC indication and MME node selection | CR | Qualcomm Incorporated | 23.401 13.5.0 CR#29872 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161217 | Introduction of non-IP data delivery via the SCEF for cellular IoT |
draftCR revision of S2-161164 |
Ericsson, Intel?, Cisco Systems Inc?, AT&T?, LG Electronics?, Samsung? |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161218 | Introduction of non-IP data delivery via the SCEF for cellular IoT |
draftCR revision of S2-161165 revised to S2-161253 |
Alcatel-Lucent, Nokia Networks, Cisco Systems Inc, Samsung, Intel |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161219 | Disabling IRAT mobility to and from NB-IOT | CR | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | 23.401 13.5.0 CR#29803 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161220 | Update HSS/HLR functionality to support non-IP data delivery via SCEF | CR | Samsung | 23.682 13.4.0 CR#1652 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161221 | Introduction of attach procedure changes for CIoT EPS optimization |
draftCR revision of S2-161152 |
Ericsson |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161222 | Introduction of attach procedure changes for CIoT EPS optimization | draftCR | Ericsson |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] | |||
S2-161223 | TAU procedure update for CIoT EPS Optimisation |
draftCR revision of S2-161203 |
ZTE |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161224 | TAU procedure update with Gn/Gp SGSN for CIoT EPS optimization | CR | Huawei, HiSilicon | 23.401 13.5.0 CR#29862 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161225 | Support for overload control | CR | Ericsson | 23.401 13.5.0 CR#29812 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] |
S2-161226 | Introduction of Control Plane CIoT EPS optimization |
draftCR revision of S2-161214 |
ZTE |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161227 | Introduction of attach procedure changes for CIoT EPS optimization. |
draftCR revision of S2-161208 |
NTT DOCOMO INC. |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161228 | Introduction of solution 18 - suspend and resume procedure | CR | Ericsson, Alcatel-Lucent, Sony, Nokia Networks | 23.401 13.5.0 CR#293011 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161229 | Introduction of support for NB-IoT |
draftCR revision of S2-161124 |
Ericsson |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161230 | NB-IoT AMBR aspects in PDN Connection request procedure - update of CR2942 |
draftCR revision of S2-161154 |
Vodafone |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161231 | Terminology related to the Next Generation System |
pCR revision of S2-161101 revised to S2-161288 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161232 | Assumptions for Core and Access functional allocation |
pCR revision of S2-161104 revised to S2-161289 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161233 | Clarification of Multi Access Technologies Support by 5G Core |
pCR revision of S2-161106 |
ZTE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
noted | [WTS] [JSN] | |
S2-161234 | Architecture Requirements for non-IP connectivity and services |
pCR revision of S2-161107 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161235 | 5G Architectural requirement for energy efficiency |
pCR revision of S2-161109 revised to S2-161290 |
Orange, Samsung | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161236 | Architectural assumptions for NexGen |
pCR revision of S2-161110 revised to S2-161341 |
Qualcomm Incorporated | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161237 | Clarification of the Network Slicing key Issue |
pCR revision of S2-161112 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-161238 | Key Issue on Policy Framework |
pCR revision of S2-161131 |
AT&T, Sprint, Deutsche Telekom, Orange, China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161239 | Key Issue on Charging |
pCR revision of S2-161132 |
AT&T, Sprint, Deutsche Telekom, Orange | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161240 | Authentication in NextGen core network: key issue |
pCR revision of S2-161133 revised to S2-161291 |
Huawei, HiSilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161241 | Clarify the Key issue on network capability exposure |
pCR revision of S2-161136 revised to S2-161292 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161242 | Key issue: 3GPP architecture impacts to support logical CN/RAN split |
pCR revision of S2-161141 revised to S2-161295 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161243 | New key issue for NexGen core impacts on IMS |
pCR revision of S2-161142 |
LG Electronics, Telecom Italia, Deutsche Telekom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161244 | SA WG2 Work Planning Worksheet |
other revision of S2-161069 |
SA WG2 Chairman |
S2-ah-17582 AI: 7.2 |
noted | [WTS] [JSN] | |||
S2-161245 | Work Planning Proposal for NexGen Study Item on how to focus study |
discussion revision of S2-161128 revised to S2-161287 |
AT&T |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |||
S2-161246 | Key issue: Base functions for a QoS framework |
pCR revision of S2-161186 revised to S2-161273 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161247 | 3GPP system aspects to support the connectivity via a relay UE |
pCR revision of S2-161144 |
LG Electronics, Sony Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161248 | Key issue on 3GPP architecture impacts to support unified network discovery and selection |
pCR revision of S2-161178 |
LG Electronics | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161249 | Key Issue on Interworking and Migration |
pCR revision of S2-161179 |
NTT DOCOMO, Intel, Nokia | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161250 | prioritisation of signalling and data aspects - update of CR 2942 |
draftCR revision of S2-161174 |
Vodafone |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161251 | Handover for non-NB-IoT devices using CIoT optimisations | CR | Vodafone | 23.401 13.5.0 CR#29882 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161252 | CIoT EPS Optimisation RRC indication and MME node selection | CR | Qualcomm Incorporated | 23.401 13.5.0 CR#29873 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
noted | [WTS] [JSN] |
S2-161253 | Introduction of non-IP data delivery via the SCEF for cellular IoT |
draftCR revision of S2-161218 |
Alcatel-Lucent, Nokia Networks, Cisco Systems Inc, Samsung, Intel |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161254 | Disabling IRAT mobility to and from NB-IOT | CR | Ericsson, Nokia Networks, Alcatel-Lucent, Qualcomm Incorporated | 23.401 13.5.0 CR#29804 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161255 | TAU procedure update with Gn/Gp SGSN for CIoT EPS optimization | CR | Huawei,HiSilicon | 23.401 13.5.0 CR#29863 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161256 | Introduction of attach procedure changes for CIoT EPS optimization. |
draftCR revision of S2-161207 |
ZTE |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161257 | CIoT EPS Optimisation RRC indication and MME node selection | draftCR | Qualcomm Incorporated |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161258 | Support for overload control | CR | Ericsson | 23.401 13.5.0 CR#29813 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161259 | Introducing support for Non-IP data for CIoT | CR | Ericsson, Cisco Systems Inc, Intel, ZTE | 23.401 13.5.0 CR#29349 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161260 | Reply LS on Clarifications on RRC Resume Request |
LS out LS is reply to S2-161088 LS To: SA WG3 revision of S2-161119 |
Qualcomm Incorporated |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161261 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161262 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161263 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161264 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161265 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161266 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161267 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161268 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161269 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161270 | Key issue on scaling and virtualization support |
pCR revision of S2-161134 revised to S2-161296 |
Cisco, Telecom Italia | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161271 | Update to Key Issue 6 |
pCR revision of S2-161146 revised to S2-161297 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161272 | Proposal for NexGen System Architecture Key Issue Concerning Top-Down NexGen Architecture Characterization |
pCR revision of S2-161180 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
withdrawn | [WTS] [JSN] | |
S2-161273 | Key issue: Base functions for a QoS framework |
pCR revision of S2-161246 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161274 | Solution to key issue 7: Interconnection and Routing Function (IRF) based network function interconnection model |
pCR revision of S2-161181 revised to S2-161298 |
Cisco Systems, Inc., Vodafone, Allot Communications | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161275 | Session management functional baseline |
pCR revision of S2-161183 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161276 | Solution: Mobility Framework |
pCR revision of S2-161196 revised to S2-161323 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161277 | Baseline mobility solution for evolved LTE and 5G RATs |
pCR revision of S2-161199 revised to S2-161325 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161278 | Levels of mobility support for mobility management |
pCR revision of S2-161145 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161279 | [DRAFT] Reply to LS on paging in NB-IoT |
LS out LS To: RAN WG2 revision of S2-161113 revised to S2-161330 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161280 | Solution to Key Issue on QoS Framework |
pCR revision of S2-161185 |
ORANGE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161281 | Network slice selection |
pCR revision of S2-161130 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161282 | Solution: Network Slicing |
pCR revision of S2-161193 revised to S2-161322 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161283 | Solutions for key issue 1- Support of Network Slicing |
pCR revision of S2-161194 revised to S2-161327 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161284 | Multiple network slices per UE |
pCR revision of S2-161190 revised to S2-161342 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161285 | Solution to support a UE with simultaneous connections to multiple Network Slices |
pCR revision of S2-161191 revised to S2-161328 |
NTT DOCOMO | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161286 | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core |
pCR revision of S2-161200 revised to S2-161329 |
ZTE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161287 | Work Planning Proposal for NexGen Study Item on how to focus study |
discussion revision of S2-161245 |
AT&T |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |||
S2-161288 | Terminology related to the Next Generation System |
pCR revision of S2-161231 revised to S2-161338 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161289 | Assumptions for Core and Access functional allocation |
pCR revision of S2-161232 revised to S2-161339 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161290 | 5G Architectural requirement for energy efficiency |
pCR revision of S2-161235 |
Orange, Samsung | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161291 | Authentication in NextGen core network: key issue |
pCR revision of S2-161240 |
Huawei, HiSilicon | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161292 | Clarify the Key issue on network capability exposure |
pCR revision of S2-161241 revised to S2-161340 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161293 | Proposal for NexGen System Architecture Key Issue Concerning Advanced Group Communication |
pCR revision of S2-161139 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161294 | Proposal for NexGen System Architecture Key Issue Concerning Advanced Off-Network Communication |
pCR revision of S2-161140 |
U.S. Department of Commerce | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161295 | Key issue: 3GPP architecture impacts to support logical CN/RAN split |
pCR revision of S2-161242 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161296 | Key issue on scaling and virtualization support |
pCR revision of S2-161270 |
Cisco, Telecom Italia | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161297 | Update to Key Issue 6 |
pCR revision of S2-161271 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161298 | Solution to key issue 7: Interconnection and Routing Function (IRF) based network function interconnection model |
pCR revision of S2-161274 |
Cisco Systems, Inc., Vodafone, Allot Communications | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161299 | Solution to Session Management |
pCR revision of S2-161182 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161300 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161301 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161302 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161303 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161304 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161305 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161306 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161307 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161308 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161309 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161310 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161311 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161312 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161313 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161314 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161315 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161316 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161317 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161318 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161319 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161320 | Not used | other | - |
S2-ah-17582 AI: 99 |
withdrawn | [WTS] [JSN] | |||
S2-161321 | Solution to Key Issue on Mobility Framework |
pCR revision of S2-161197 revised to S2-161324 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161322 | Solution: Network Slicing |
pCR revision of S2-161282 revised to S2-161326 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161323 | Solution: Mobility Framework |
pCR revision of S2-161276 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161324 | Solution to Key Issue on Mobility Framework |
pCR revision of S2-161321 |
Intel | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161325 | Baseline mobility solution for evolved LTE and 5G RATs |
pCR revision of S2-161277 revised to S2-161349 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161326 | Solution: Network Slicing |
pCR revision of S2-161322 |
Nokia Networks | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161327 | Solutions for key issue 1- Support of Network Slicing |
pCR revision of S2-161283 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161328 | Solution to support a UE with simultaneous connections to multiple Network Slices |
pCR revision of S2-161285 |
NTT DOCOMO | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161329 | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core |
pCR revision of S2-161286 revised to S2-161343 |
ZTE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161330 | LS on paging in NB-IoT |
LS out LS is reply to S2-161096 LS To: RAN WG2, RAN WG3, CT WG1 revision of S2-161279 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161331 | Reply LS on NB-IoT work progress in RAN WG2 |
LS out LS is reply to S2-161091 LS To: RAN WG2, CT WG1 revision of S2-161173 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161332 | [DRAFT] Reply to S on CIoT optimization for non-NB-IoT UEs |
LS out LS To: RAN WG2 revision of S2-161176 revised to S2-161352 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161333 | Reply LS on questions on NB-IoT |
LS out LS is reply to S2-160937 LS To: RAN WG2, RAN WG3, CT WG1, SA WG3 revision of S2-161117 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161334 | Reply LS on CIOT optimization |
LS out LS To: RAN WG3, RAN WG2 revision of S2-161177 revised to S2-161344 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161335 | [Draft] Reply LS on Existence of CIoT support and NAS protocol details for CIoT |
LS out LS To: CT WG1, RAN WG2, RAN WG3 revision of S2-161120 revised to S2-161345 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161336 | Reply LS on the SGW/PGW Selection |
LS out LS To: CT WG4 revision of S2-161210 revised to S2-161346 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161337 | [DRAFT] Reply LS on Non IP Data Delivery procedures |
LS out LS To: CT WG4 revision of S2-161209 revised to S2-161347 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
revised | [WTS] [JSN] | |||
S2-161338 | Terminology related to the Next Generation System |
pCR revision of S2-161288 revised to S2-161350 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161339 | Assumptions for Core and Access functional allocation |
pCR revision of S2-161289 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161340 | Clarify the Key issue on network capability exposure |
pCR revision of S2-161292 |
China Mobile | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161341 | Architectural assumptions for NexGen |
pCR revision of S2-161236 |
Qualcomm Incorporated | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161342 | Multiple network slices per UE |
pCR revision of S2-161284 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161343 | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core |
pCR revision of S2-161329 revised to S2-161351 |
ZTE | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
revised | [WTS] [JSN] | |
S2-161344 | Reply LS on CIOT optimization |
LS out LS is reply to S2-160938 LS To: RAN WG3, RAN WG2 revision of S2-161334 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161345 | Reply LS on Existence of CIoT support and NAS protocol details for CIoT |
LS out LS is reply to S2-161092 LS To: CT WG1, RAN WG2, RAN WG3 revision of S2-161335 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161346 | Reply LS on the SGW/PGW Selection |
LS out LS is reply to S2-161093 LS To: CT WG4 revision of S2-161336 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161347 | Reply LS on Non IP Data Delivery procedures |
LS out LS is reply to S2-161094 LS To: CT WG4 revision of S2-161337 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] | |||
S2-161348 | SMS support with EPS attach and TAU |
CR revision of S2-160978 |
Ericsson | 23.272 13.2.0 CR#9611 catB | CIoT | Rel-13 |
S2-ah-17582 AI: 5.6 |
agreed | [WTS] [JSN] |
S2-161349 | Baseline mobility solution for evolved LTE and 5G RATs |
pCR revision of S2-161325 |
Ericsson | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161350 | Terminology related to the Next Generation System |
pCR revision of S2-161338 |
Huawei, HiSilicon, China Unicom | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161351 | 3GPP architecture framework proposal for Next Generation Network Architecture with Access Independent Core |
pCR revision of S2-161343 |
ZTE, ETRI | 23.799 0.2.0 | FS_NextGen |
S2-ah-17582 AI: 6.1 |
approved | [WTS] [JSN] | |
S2-161352 | Response LS on CIoT optimization for non-NB-IoT UEs |
LS out LS is reply to S2-161097 LS To: RAN WG2, RAN WG3, CT WG1 revision of S2-161332 |
SA WG2 |
S2-ah-17582 AI: 5.6 |
approved | [WTS] [JSN] |
420 documents (1.0793759822845 seconds)