Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| S1-254000 | 1st Draft Agenda for SA1#112 | agenda | SA1 Chair |
S1-112 AI: 1.1 |
noted | [WTS] [JSN] | |||
| S1-254001 | 2nd Draft Agenda for SA1#112 | agenda | SA1 Chair |
S1-112 AI: 1.1 |
noted | [WTS] [JSN] | |||
| S1-254002 | Agenda for SA1#112 | agenda | SA1 Chair |
S1-112 AI: 1.1 |
approved | [WTS] [JSN] | |||
| S1-254003 | Extract of the 3GPP Work Plan for SA1#112 | Work Plan | ETSI MCC |
S1-112 AI: 2 |
noted | [WTS] [JSN] | |||
| S1-254004 | Draft minutes of previous SA1 meeting |
report revised to S1-254005 |
ETSI MCC |
S1-112 AI: 1.3 |
revised | [WTS] [JSN] | |||
| S1-254005 | Minutes of previous SA1 meeting |
report revision of S1-254004 |
ETSI MCC |
S1-112 AI: 1.3 |
approved | [WTS] [JSN] | |||
| S1-254006 | SA1-related topics at last SA Plenary | report | SA1 Chair |
S1-112 AI: 2 |
noted | [WTS] [JSN] | |||
| S1-254007 | Guidance on writing CRs | other | ETSI MCC |
S1-112 AI: 2 |
noted | [WTS] [JSN] | |||
| S1-254008 | Proposed Steps after SA1#112 |
report revised to S1-254409 |
SA1 Chair & MCC |
S1-112 AI: 2 |
revised | [WTS] [JSN] | |||
| S1-254009 | Proposed editorial updates to draft TR 22.870v0.4.0 (output of SA1 #111) | pCR | 6G Study Rapporteurs | 22.87 0.4.0 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1 |
endorsed | [WTS] [JSN] |
| S1-254010 | TR 22.870 v0.4.1 as basis for SA1#112 contributions | other | Rapporteurs | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1 |
endorsed | [WTS] [JSN] | |
| S1-254011 | Finalizing TR 22.870 | discussion | TR 22.870 Rapporteurs & SA1 officials |
S1-112 AI: 2 |
noted | [WTS] [JSN] | |||
| S1-254012 | Pseudo-CR on IMS multimedia telephony service |
pCR revised to S1-254123 |
NEC | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254013 | Removing Clause 5.7.1.2 Editor’s Note on FWA |
pCR revised to S1-254019 |
T-Mobile USA Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254014 | PR Living List (Tracking Tool) for Consolidation | other | 6G Study Rapporteurs | Rel-20 |
S1-112 AI: 8.1. |
noted | [WTS] [JSN] | ||
| S1-254015 | Rapporteur proposed consolidated requirements skeleton (Clause Y) | pCR | 6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
noted | [WTS] [JSN] |
| S1-254016 | Fix EN on use case 5.5.8 on security control enhancement with NDT in 6G network |
pCR revised to S1-254334 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254017 | New use case for gas and Water Metering |
pCR revised to S1-254422 |
Ericsson, Itron, AT&T, Verizon, Sony, Nokia, EDF | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.7.2 |
revised | [WTS] [JSN] |
| S1-254018 | Update Utility use case 10.2 |
pCR revised to S1-254423 |
Ericsson, Itron, AT&T, Verizon, Qualcomm, Sony, EDF, Nokia, KPN, Philips | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.7.2 |
revised | [WTS] [JSN] |
| S1-254019 | Removing Clause 5.7.1.2 Editor’s Note on FWA |
pCR revision of S1-254013 revised to S1-254335 |
T-Mobile USA Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254020 | Rapporteur proposed potential requirements allocation for CPRs | pCR | 6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254021 | UC 5.8.2 Use case on energy efficiency of 6G system with multiple access networks (TN and NTN) - UPDATES |
pCR revised to S1-254337 |
THALES | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254022 | Optimizing Revision Numbers | discussion | Deutsche Telekom, Softbank, Ericsson, Telefonica, Huawei, ZTE, NEC | S1-112 | noted | [WTS] [JSN] | |||
| S1-254023 | Consolidation of KPI requirements on immersive section |
pCR revised to S1-254324 |
Moderator (China Unicom) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254024 | Consolidation of KPI requirements on AI section |
pCR revised to S1-254325 |
Moderator (China Unicom) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254025 | Discussion on KPIs related to the Immersive and AI | discussion | Moderator (China Unicom) | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
withdrawn | [WTS] [JSN] | |
| S1-254026 | Use case on supporting environmental awareness data management using collaborative service robots |
pCR revised to S1-254103 |
LG Electronics Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254027 | Use case on Supporting dynamic QoS and network resource efficiency considering AI service |
pCR revised to S1-254100 |
LG Electronics Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254028 | Update on Use Case 11.5 Immersive media services for advanced air mobility (AAM) enabled by 6G NTN |
pCR revised to S1-254429 |
LG Electronics Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
revised | [WTS] [JSN] |
| S1-254029 | Update on Use Case 11.9 Use case on collaborative awareness in dynamic environments - enhancing mutual decision-making through real time data sharing |
pCR revised to S1-254474 |
LG Electronics Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
revised | [WTS] [JSN] |
| S1-254030 | Additional requirements for 5.3 Support of non-3GPP access |
pCR revised to S1-254354 |
LG Electronics Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254031 | New Study on Wireless Power Transfer |
SID new revised to S1-254243 |
Huawei Technologies Sweden AB | Rel-21 |
S1-112 AI: 4 |
revised | [WTS] [JSN] | ||
| S1-254032 | Use Case on Enhanced Multi-Access Connectivity |
pCR revised to S1-254382 |
NICT, Deutsche Telekom, Thales, Novamint, NEC | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
revised | [WTS] [JSN] |
| S1-254033 | Introduction and proposal for Token communication |
discussion revised to S1-254206 |
OPPO | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] | ||
| S1-254034 | Resubmission of a use case on NTN based Sensing of space debris |
pCR revised to S1-254281 |
TNO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254035 | Resubmission of use case on NTN based high-altitude UAV supervision |
pCR revised to S1-254282 |
TNO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254036 | Resubmission of use case on NTN based detection of ships in the open sea |
pCR revised to S1-254283 |
TNO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254037 | Resubmission of use case on NTN based Atmospheric monitoring and weather alerts |
pCR revised to S1-254284 |
TNO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254038 | Resubmission of Use Case on Real time traffic offloading using HAPS in a time specific requirement on a geographically challenging area |
pCR revised to S1-254285 |
CEWiT, Tejas Network Limited, SoftBank Corp. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
revised | [WTS] [JSN] |
| S1-254039 | Resubmission of Use Case on Positioning Service for Network Optimization |
pCR revised to S1-254286 |
CEWiT, Tejas Network Limited | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254040 | new use case on 6GS providing token communication service |
pCR revised to S1-254222 |
Huawei Technologies France | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254041 | new use case on 6GS provide secure environment as 6G service enabler |
pCR revised to S1-254221 |
Huawei Technologies France | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254042 | Use case on sensing result validation |
pCR revised to S1-254089 |
ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254043 | Discussion of 5G Requirements Simplification for 6G |
discussion revised to S1-254174 |
Samsung |
S1-112 AI: 4 |
revised | [WTS] [JSN] | |||
| S1-254044 | New WID "Feasibility Study on 5G Requirements Simplification for 6G" |
SID new revised to S1-254173 |
Samsung Electronics GmbH | Rel-21 |
S1-112 AI: 4 |
revised | [WTS] [JSN] | ||
| S1-254045 | new use case on 6GS assisted physical AI training data generation |
pCR revised to S1-254223 |
Huawei Technologies France | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254046 | Pseudo-CR on New use case on Immersive Audio Production in Live Events | pCR | SHURE Europe GmbH | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.9.1 |
withdrawn | [WTS] [JSN] |
| S1-254047 | Update data exposure service use case 5.5.5 |
pCR revised to S1-254356 |
Nokia, CEWIT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254048 | New use case on network decarbonation | pCR | Orange | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
merged | [WTS] [JSN] |
| S1-254049 | New use case on Greenhouse Gas (GHG) - efficient network use | pCR | Orange | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
merged | [WTS] [JSN] |
| S1-254050 | Use Case on smart manufacturing enabled by diverse autonomous robots |
pCR revised to S1-254470 |
Orange | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
revised | [WTS] [JSN] |
| S1-254051 | Pseudo-CR on Use case on Ubiquitous and resilient network | pCR | Orange | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.1 |
noted | [WTS] [JSN] |
| S1-254052 | Editorial Cleanup of draft TR 22.870v0.4.1 |
pCR revised to S1-254430 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
revised | [WTS] [JSN] |
| S1-254053 | Resubmission of Pseudo-CR on Timely Event Logging Exposure for Security | pCR | DSIT, NCSC, BSI DE, BMWE | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254054 | New use case on Remote Command and Control Communication of Humanoid Robot | pCR | CENC | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
not treated | [WTS] [JSN] |
| S1-254055 | New Use Case on Adaptive Path Planning for AI embodied UAVsAGVs | pCR | China Mobile Com. Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] |
| S1-254056 | New use case on task driven network communication for vertical users | pCR | China Mobile Com. Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
withdrawn | [WTS] [JSN] |
| S1-254057 | New use case on task driven network communication for vertical users |
pCR revised to S1-254426 |
China Mobile Com. Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
revised | [WTS] [JSN] |
| S1-254058 | Updated use case on optimizing user experience for GenAI applications |
pCR revised to S1-254304 |
OPPO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254059 | pCR on update of use case 6.48 on service robot for power grid |
pCR revised to S1-254342 |
ZTE Corporation, China Telecom, China Unicom | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254060 | Use case on energy saving of AI-native system |
pCR revised to S1-254450 |
ZTE Corporation, China Telecom | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254061 | Use case on digital twin for AI operation |
pCR revised to S1-254352 |
ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254062 | Proposal on CPRs in Y.1.8 AI | discussion | ZTE Corporation | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] | |
| S1-254063 | New use case on Safe NTN Uplink Emissions |
pCR revised to S1-254164 |
SKY Perfect JSAT Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254064 | New use case on Compute Service Discovery in Coordination with the Network | pCR | Nokia, KPN, Softbank | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.9.2 |
noted | [WTS] [JSN] |
| S1-254065 | Pseudo-CR on updated use case of real time digital twins |
pCR revised to S1-254471 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
revised | [WTS] [JSN] |
| S1-254066 | pCR on solving EN in intent definition |
pCR revised to S1-254378 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254067 | Resubmission of New use case on AI-driven LCS for Lost Detection |
pCR revised to S1-254370 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254068 | pCR on updating 6.11 |
pCR revised to S1-254383 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254069 | pCR on updating 6.22 |
pCR revised to S1-254385 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254070 | pCR on updating 6.32 |
pCR revised to S1-254386 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254071 | pCR on updating 6.35 | pCR | China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254072 | pCR on solving EN in 9.5 | pCR | China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.1 |
merged | [WTS] [JSN] |
| S1-254073 | pCR on Y.1.9 | pCR | China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254074 | pCR on Y.1.10 | pCR | China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254075 | pCR on updating 5.7.10 |
pCR revised to S1-254358 |
China Mobile Com. Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254076 | Updated use case 8.7 on low-power positioning |
pCR revised to S1-254407 |
Nokia, AT&T, ESA, Thales, Novamint, Airbus | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
revised | [WTS] [JSN] |
| S1-254077 | Update to sustainability overview |
pCR revised to S1-254432 |
Nokia, Orange, EDF | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
revised | [WTS] [JSN] |
| S1-254078 | Update efficient data collection use case 5.9.2 |
pCR revised to S1-254360 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254079 | Pseudo-CR on Use Case on Immersive Audio Production in Live Events |
pCR revised to S1-254417 |
SHURE Europe GmbH | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.1 |
revised | [WTS] [JSN] |
| S1-254080 | UC - 5.10.2 Diversity of UEs for satellite access -UPDATES | pCR | THALES | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254081 | Resolution of EN in Clause 5.4.3 | pCR | 6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254082 | Pseudo-CR on Terms | pCR | SHURE Europe GmbH | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
merged | [WTS] [JSN] |
| S1-254083 | Proposed Text for Clause 4 (Overview) |
pCR revised to S1-254431 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
revised | [WTS] [JSN] |
| S1-254084 | Editorial conversion from table to text format of the sustainability impact analyses | pCR | Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
not treated | [WTS] [JSN] |
| S1-254085 | Rapporteur proposed potential requirements allocation for CPRs | pCR | 6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254086 | Use case on Joint QoS handling for 6G Service |
pCR revised to S1-254418 |
Qualcomm Korea | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.2 |
revised | [WTS] [JSN] |
| S1-254087 | Revised Definition of AI Service |
pCR revised to S1-254379 |
Qualcomm Korea | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254088 | pCR on updating 6.45 Use case on flexible UE-Network coordination through AI Agent(s) |
pCR revised to S1-254387 |
China Unicom, Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254089 | Resubmission Use case on sensing result confidence monitoring |
pCR revision of S1-254042 revised to S1-254391 |
ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254090 | New use case on group management for AI agents |
pCR revised to S1-254371 |
Xiaomi | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254091 | pCR on update of clause 5.8.6 |
pCR revised to S1-254299 |
ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254092 | Proposal on Clause Y.1.3 Resilience | pCR | China Telecom | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254093 | New use case on AI agent assisted rescue in the water park |
pCR revised to S1-254372 |
Xiaomi, China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254094 | Update on clause 6.23 child health management assistant | pCR | Xiaomi | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
merged | [WTS] [JSN] |
| S1-254095 | Update on clause 6.41 authentication and authorization for AI agents | pCR | Xiaomi | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254096 | Proposal for CPR of basic services and capabilities Y.1.1 | pCR | ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254097 | Update of Use Case on UAC | pCR | Qualcomm Incorporated | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254098 | Update of Use Case on NW coverage verification | pCR | Qualcomm Incorporated | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254099 | Consolidation of KPI requirements on Massive Communication |
pCR revised to S1-254322 |
KDDI Corporation (Moderator) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254100 | Use case on Supporting dynamic QoS and network resource efficiency considering AI service |
pCR revision of S1-254027 revised to S1-254365 |
LG Electronics Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254101 | Update on Cooperating UEs |
pCR revised to S1-254436 |
Qualcomm Incorporated | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254102 | Re-submission of Use case on PWS over non-3GPP access | pCR | Qualcomm Incorporated | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.9.2 |
noted | [WTS] [JSN] |
| S1-254103 | Use case on supporting environmental awareness data management using collaborative service robots |
pCR revision of S1-254026 |
LG Electronics Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254104 | Consolidation of KPI requirements on Further Use Cases on Industry and Verticals |
pCR revised to S1-254323 |
KDDI Corporation (Moderator) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254105 | LS reply on PWS for NB-IOT |
LS out revised to S1-254306 |
Qualcomm Incorporated | Rel-19 |
S1-112 AI: 3 |
revised | [WTS] [JSN] | ||
| S1-254106 | CR on PWS clarifications_R19 |
CR revised to S1-254307 |
Qualcomm Incorporated | 22.268 19.1.0 CR#91 catF | TEI19 | Rel-19 |
S1-112 AI: 3 |
revised | [WTS] [JSN] |
| S1-254107 | CR on PWS clarifications_R20 mirror |
CR revised to S1-254308 |
Qualcomm Incorporated | 22.268 20.0.0 CR#92 catA | TEI20 | Rel-20 |
S1-112 AI: 3 |
revised | [WTS] [JSN] |
| S1-254108 | Update on Use case 6.24 distributed 6G network for AI computing |
pCR revised to S1-254388 |
SoftBank Corp., NEC, Rakuten Mobile, NVIDIA | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254109 | LS reply on IMS Voice over GEO |
LS out revised to S1-254309 |
Qualcomm Incorporated | Rel-20 |
S1-112 AI: 3 |
revised | [WTS] [JSN] | ||
| S1-254110 | CR on IMS Voice over GEO clarifications |
CR revised to S1-254310 |
Qualcomm Incorporated | 22.261 20.4.0 CR#852 catF | 5GSAT_Ph4-REQ | Rel-20 |
S1-112 AI: 3 |
revised | [WTS] [JSN] |
| S1-254111 | Clarification on 3GPP services utilizing AI technology | pCR | vivo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254112 | Update on UC#6.50 | pCR | vivo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254113 | LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC | LS out | vivo | Rel-20 |
S1-112 AI: 3 |
merged | [WTS] [JSN] | ||
| S1-254114 | Remove EN in section 5.9.2 |
pCR revised to S1-254348 |
vivo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254115 | Update on UC#W.1 | pCR | vivo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.9.2 |
noted | [WTS] [JSN] |
| S1-254116 | Reply LS on PWS support for NB-IoT | LS out | CATT | Rel-19 |
S1-112 AI: 3 |
merged | [WTS] [JSN] | ||
| S1-254117 | Reply LS on issues related to support IMS voice over NB-IoT NTN | LS out | CATT | Rel-20 |
S1-112 AI: 3 |
merged | [WTS] [JSN] | ||
| S1-254118 | Update 9.8 UC on holographic telepresence in healthcare |
pCR revised to S1-254421 |
CATT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.1 |
revised | [WTS] [JSN] |
| S1-254119 | Update 8.17 UC on Satellite backhaul |
pCR revised to S1-254403 |
CATT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.1 |
revised | [WTS] [JSN] |
| S1-254120 | Discussion on CPRs of Ubiquitous Connectivity | discussion | CATT | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] | |
| S1-254121 | pCR on CPRs of Ubiquitous Connectivity Clause Y_1_11 | pCR | CATT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254122 | pCR on CPRs of Ubiquitous Connectivity Clause Y_2_3 | pCR | CATT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254123 | Pseudo-CR on IMS multimedia telephony service |
pCR revision of S1-254012 revised to S1-254336 |
NEC | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254124 | pCR on update clause 8.12 | pCR | ZTE Corporation,CSCN | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
approved | [WTS] [JSN] |
| S1-254125 | Pseudo-CR on updating utility use case in clause 11.25 |
pCR revised to S1-254424 |
Verizon Netherlands | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
revised | [WTS] [JSN] |
| S1-254126 | Pseudo-CR on KPI update on Utility Direct Transfer Trip |
pCR revised to S1-254425 |
Verizon Netherlands | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
revised | [WTS] [JSN] |
| S1-254127 | Pseudo-CR on Consolidated Potential Requirements for computing requirements | pCR | NTT DOCOMO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254128 | Use case on of an Autonomous Network Management – a request to study |
pCR revised to S1-254349 |
Verizon Netherlands | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254129 | Pseudo-CR on Alignment of AI Agent Terminology | pCR | NTT DOCOMO INC. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254130 | Update for clause Y.1.7-2 in S1-254020 | pCR | NEC Corporation (ARIB) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254131 | Update for clause Y.1.5-1 in S1-254020 | pCR | NEC Corporation (ARIB) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254132 | Update for clause Y.1.9-1 in S1-254020 | pCR | NEC Corporation (ARIB) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254133 | Update for clause Y.1.8-1 in S1-254020 | pCR | NEC Corporation (ARIB) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254134 | Use Case on Two-Sided AI Agent Communication with Common Knowledge | pCR | Pengcheng Laboratory, BUPT, ZGC Institute of Ubiquitous-X Innovation and Application | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
withdrawn | [WTS] [JSN] |
| S1-254135 | LS on indication of LMF-based AI/ML Positioning | LS in | C3-254615 |
S1-112 AI: 3 |
withdrawn | [WTS] [JSN] | |||
| S1-254136 | Reply LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC | LS in | C1-256676 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254137 | LS to 3GPP about the external data channel content access requirements | LS in | GSMA |
S1-112 AI: 3 |
replied to | [WTS] [JSN] | |||
| S1-254138 | Reply LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC | LS in | R1-2508096 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254139 | LS on traffic model study in RAN1 | LS in | R1-2508184 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254140 | Reply LS on Broadcasting Information on Disaster Condition of a PLMN from E-UTRAN in Case of Disaster Condition | LS in | R2-2507744 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254141 | Reply LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC | LS in | R2-2507784 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254142 | Reply to Reply LS on removal of support of PWS over satellite NG-RAN in Rel-17 and 18 | LS in | S2-2509321 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254143 | Reply LS on removal of support of PWS over satellite NG-RAN in Rel-17 and 18 | LS in | CP-252246 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254144 | LS on Study on Modernization of Specification Format and Procedures for 6G | LS in | SP-251228 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254145 | LS PWS support in NB-IoT terrestrial networks | LS in | R2-2506297 |
S1-112 AI: 3 |
replied to | [WTS] [JSN] | |||
| S1-254146 | Reply LS on accessing external data channel content | LS in | S2-2507541 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254147 | Reply LS on the RAN simulation assumptions for ULBC | LS in | S2-2507578 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254148 | LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC | LS in | S2-2507636 |
S1-112 AI: 3 |
replied to | [WTS] [JSN] | |||
| S1-254149 | Reply LS to SA4 on the RAN simulation assumptions for ULBC | LS in | C1-255650 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254150 | Reply LS on the External Data Channel Content Access | LS in | S3-252931 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254151 | LS on business model and architecture for SNPN cellular hotspots | LS in | S3-253046 |
S1-112 AI: 3 |
replied to | [WTS] [JSN] | |||
| S1-254152 | LS on Rel-20 5GA OAM and Charging related requirements in SA1 | LS in | S5-253406 |
S1-112 AI: 3 |
replied to | [WTS] [JSN] | |||
| S1-254153 | Pseudo-CR on updating use case 6.53 | pCR | China Telecommunications Corp. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.1 |
merged | [WTS] [JSN] |
| S1-254154 | Pseudo-CR on updating use case 9.7 | pCR | China Telecommunications Corp. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.2 |
agreed | [WTS] [JSN] |
| S1-254155 | Use case on knowledge-enhanced disaster rescue |
pCR revised to S1-254373 |
Pengcheng Laboratory, BUPT, ZGC Institute of Ubiquitous-X Innovation and Application | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254156 | updated use case for efficient data collection and consumption for 6G system |
pCR revised to S1-254361 |
NTT DOCOMO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254157 | PCR for solving editors notes in 6.38 AI for disability |
pCR revised to S1-254364 |
Ericsson | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.1 |
revised | [WTS] [JSN] |
| S1-254158 | Pseudo-CR on table 10.3.6-1 KPI for M-IoT | pCR | KDDI Corporation (Moderator) | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.7.2 |
merged | [WTS] [JSN] |
| S1-254159 | pCR on Consolidated Potential Requirements for resilience requirements | pCR | NTT DOCOMO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254160 | proposal on energy related CPRs (Y.1.4) | pCR | ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254161 | 22.870 pCR 7.17 Update | pCR | Samsung | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.1 |
noted | [WTS] [JSN] |
| S1-254162 | proposal on ISAC CPRs (Y.1.10) | pCR | ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254163 | proposal for CPRs of Ubiquitous connectivity (Y.1.11) | pCR | ZTE Corporation,CSCN | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254164 | New use case on Safe NTN Uplink Emissions |
pCR revision of S1-254063 |
SKY Perfect JSAT Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254165 | proposal on CPR of Industry and Vertical (Y.1.14) | pCR | ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254166 | Proposal on update of CPR: Y.1.5 to Y.1.2 | pCR | CEWiT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254167 | New Use Case on critical communication infrastructure during a power outage situation |
pCR revised to S1-254350 |
KPN N.V. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254168 | New Use Case on Medical applications in 6G |
pCR revised to S1-254427 |
TNO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
revised | [WTS] [JSN] |
| S1-254169 | Update UC 5.8.6 “on energy saving for network in industry park” | pCR | TNO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
merged | [WTS] [JSN] |
| S1-254170 | Resubmit new use case on Predictive Maintenance in Smart Factories | pCR | China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] |
| S1-254171 | Update UC 9.5 to clean editor’s notes |
pCR revised to S1-254420 |
TNO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.1 |
revised | [WTS] [JSN] |
| S1-254172 | Reply LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC | LS in | S3-253797 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254173 | New WID "Feasibility Study on 5G Requirements Simplification for 6G" |
SID new revision of S1-254044 revised to S1-254315 |
Samsung Electronics GmbH | Rel-21 |
S1-112 AI: 4 |
revised | [WTS] [JSN] | ||
| S1-254174 | Discussion of 5G Requirements Simplification for 6G |
discussion revision of S1-254043 |
Samsung |
S1-112 AI: 4 |
noted | [WTS] [JSN] | |||
| S1-254175 | Resubmission Explanation of High Altitude Platform Station (HAPS) | pCR | SoftBank Corp. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
merged | [WTS] [JSN] |
| S1-254176 | Pseudo-CR on Use case on Ubiquitous and resilient network | pCR | SoftBank Corp. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.1 |
approved | [WTS] [JSN] |
| S1-254177 | Update to clause 5.7.7 IMS Media Related Service |
pCR revised to S1-254347 |
China Unicom,Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254178 | Update to clause 5.9.4 Network simplification on 6G system | pCR | China Unicom,Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254179 | Updated use case 6.7 on AI agents communication |
pCR revised to S1-254389 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254180 | Discussion on CPRs of Computing Clasue Y_1_9 | discussion | CATT | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] | |
| S1-254181 | pCR on CPRs of Computing Clause Y_1_9 | pCR | CATT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254182 | [Draft] Reply to LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC (S2-2507636) | LS out | OPPO | Rel-20 |
S1-112 AI: 3 |
merged | [WTS] [JSN] | ||
| S1-254183 | New use case on Multi-MNO Cooperative Service Continuity in Disaster Scenarios |
pCR revised to S1-254374 |
TURKCELL, Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254184 | 22.261v17.15.0 Correction on the end-to-end latency via satellite |
CR revised to S1-254318 |
ZTE Corporation | 22.261 17.15.0 CR#853 catF | 5GSAT, TEI17 | Rel-17 |
S1-112 AI: 5 |
revised | [WTS] [JSN] |
| S1-254185 | 22.261v18.18.0 Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revised to S1-254319 |
ZTE Corporation | 22.261 18.18.0 CR#854 catA | 5GSAT | Rel-18 |
S1-112 AI: 5 |
revised | [WTS] [JSN] |
| S1-254186 | 22.261v19.12.0 Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revised to S1-254320 |
ZTE Corporation | 22.261 19.12.0 CR#855 catA | 5GSAT | Rel-19 |
S1-112 AI: 5 |
revised | [WTS] [JSN] |
| S1-254187 | 22.261v20.4.0 Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revised to S1-254321 |
ZTE Corporation | 22.261 20.4.0 CR#856 catA | 5GSAT | Rel-20 |
S1-112 AI: 5 |
revised | [WTS] [JSN] |
| S1-254188 | New Use case on Energy-aware Network exposure considering UE preference |
pCR revised to S1-254351 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254189 | Proposed consolidated requirements on computing | pCR | ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254190 | Proposed consolidated requirements on IC (Clause Y.1.12) |
pCR revised to S1-254296 |
ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254191 | Proposed consolidated requirements on localized network |
pCR revised to S1-254291 |
ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254192 | pCR on Update 5.7.5 for addressing EN |
pCR revised to S1-254512 |
ZTE Corporation, Deutsche Telekom | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254193 | pCR on Update 5.9.2 for addressing EN | pCR | ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
merged | [WTS] [JSN] |
| S1-254194 | UC on supporting uplink content caching in 3GPP network | pCR | ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.9.2 |
withdrawn | [WTS] [JSN] |
| S1-254195 | Use Case on AI Agent enabled Semantic Communication Service | pCR | Pengcheng Laboratory, BUPT, ZGC Institute of Ubiquitous-X Innovation and Application | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254196 | Use case on AI-native joint source-channel optimization for high-rate media and sensing |
pCR revised to S1-254375 |
Pengcheng Laboratory, BUPT, ZGC Institute of Ubiquitous-X Innovation and Application, AsiaInfo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254197 | Proposal on consolidated potential requirements Y.1.8 | pCR | China Telecommunications Corp. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] |
| S1-254198 | Use case on AI Explainability framework for 6G | pCR | Tejas Network Limited | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254199 | Update of 5.5.1 for multi-party trust scenarios |
pCR revised to S1-254355 |
Deutsche Telekom | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254200 | Consolidation of clauses 5.1 to 5.4 | pCR | Deutsche Telekom, Charter | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
noted | [WTS] [JSN] |
| S1-254201 | Pseudo-CR on Privacy Protection of Personal Data | pCR | OTD_US | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254202 | Access category for Unattended Data Traffic |
CR revised to S1-254316 |
SK Telecom, LG Uplus, Verizon, Huawei, Hisilicon, China Unicom, China Telecom, vivo, NTT DOCOMO | 22.261 20.4.0 CR#857 catB | DUMMY | Rel-20 |
S1-112 AI: 4 |
revised | [WTS] [JSN] |
| S1-254203 | New miniWID on Access Category for Unattended Data Traffic |
WID new revised to S1-254317 |
SK Telecom, LG Uplus, Verizon, Huawei, Hisilicon, China Unicom, China Telecom, vivo, NTT DOCOMO | Rel-20 |
S1-112 AI: 4 |
revised | [WTS] [JSN] | ||
| S1-254204 | Additional discussion on access category for Unattended Data Traffic | discussion | SK Telecom, LG Uplus, Verizon, Huawei, Hisilicon, China Unicom, China Telecom, vivo, NTT DOCOMO | Rel-20 |
S1-112 AI: 4 |
noted | [WTS] [JSN] | ||
| S1-254205 | Update on Unified Access Control in clause 5.7.6 |
pCR revised to S1-254357 |
SK Telecom, Qualcomm Incorporated | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254206 | Introduction and proposal for Token communication |
discussion revision of S1-254033 |
OPPO | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] | ||
| S1-254207 | fix EN on diverse UE types 5.10.1 |
pCR revised to S1-254330 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254208 | Use Case on Two-Sided AI Agent Communication with Common Knowledge |
pCR revised to S1-254376 |
Pengcheng Laboratory, BUPT, ZGC Institute of Ubiquitous-X Innovation and Application | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254209 | Introduction for sustainability and energy efficiency chapter | pCR | Orange | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
merged | [WTS] [JSN] |
| S1-254210 | Use case on AI-enabled satellite-UAV collaborative emergency service |
pCR revised to S1-254367 |
BUPT, Pengcheng Laboratory, CMCC, China Telecom, ZGC Institute of Ubiquitous-X Innovation and Application, OPPO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254211 | Update Use case 5.8.1 on end-to-end energy efficiency improvement |
pCR revised to S1-254359 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254212 | LS on the initiation of draft new Recommendation ITU-T Y.EIR-ILH “Requirements and capabilities of intelligent robots for industrial IoT scenarios” | LS in | ITU SG20-LS62 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | |||
| S1-254213 | Use case on 6G AI Agent collaboration for disaster rescue |
pCR revised to S1-254368 |
BUPT, Pengcheng Laboratory, ZGC Institute of Ubiquitous-X Innovation and Application, CMCC | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254214 | Pseudo-CR on Annex related to satellite/NTN |
pCR revised to S1-254280 |
NOVAMINT, Thales, TNO, ESA | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
revised | [WTS] [JSN] |
| S1-254215 | Use case on 3D hyper-realistic video services | pCR | BUPT, Pengcheng Laboratory, ZGC Institute of Ubiquitous-X Innovation and Application, MIGU Co.,Ltd, CMCC | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.2 |
noted | [WTS] [JSN] |
| S1-254216 | updated pCR to UC 7.3 High-resolution topographical maps | pCR | Xiaomi Communications | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] |
| S1-254217 | updated pCR for New use case UE sensor groups |
pCR revised to S1-254395 |
Xiaomi Communications | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254218 | updated pCR New Use Case for Efficient Sensing service delivery to sensor groups |
pCR revised to S1-254400 |
Xiaomi Communications | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254219 | Discussion on FS_6G_REQ Potential Requirements Consolidation | discussion | Huawei | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] | |
| S1-254220 | New use case on UE accessing 6G new services from partner PLMNs |
pCR revised to S1-254333 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254221 | new use case on 6GS provide secure environment as 6G service enabler |
pCR revision of S1-254041 revised to S1-254369 |
Huawei Technologies France | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254222 | new use case on 6GS providing token communication service |
pCR revision of S1-254040 revised to S1-254362 |
Huawei Technologies France | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254223 | new use case on 6GS assisted physical AI training data generation |
pCR revision of S1-254045 revised to S1-254346 |
Huawei Technologies France | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254224 | New use case on 6G provide companion robot on-demand customized services |
pCR revised to S1-254301 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254225 | New use case on 6GS support network-assisted decentralized federated learning among multiple UEs or Servers | pCR | Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254226 | New use case on 6GS support of distributed AI model inferencing |
pCR revised to S1-254377 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254227 | New use case on Intelligent Data Service | pCR | Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254228 | New use case on 3D indoor positioning | pCR | Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.9.2 |
noted | [WTS] [JSN] |
| S1-254229 | Discussion on machine unlearning aspects | discussion | Huawei | FS_6G_REQ |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] | ||
| S1-254230 | Discussion on the use of Time-To-First-Token (TTFT) in SA1 for 6G AI inference service |
discussion revised to S1-254519 |
Huawei | FS_6G_REQ |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] | ||
| S1-254231 | pCR on TTFT and its importance for AI inference latency |
pCR revised to S1-254302 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254232 | Update to clause 5.9.2 use case on efficient data collection and control for 6G system |
pCR revised to S1-254353 |
Huawei, China Mobile, CATT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254233 | Update to clause 6.9 collaborative AI agents |
pCR revised to S1-254491 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254234 | Update to clause 8.8 on KPI value for global mobile video |
pCR revised to S1-254408 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
revised | [WTS] [JSN] |
| S1-254235 | Update to clause 6.11 Use case on built-in Intelligent Communication Assistant | pCR | Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
withdrawn | [WTS] [JSN] |
| S1-254236 | Update of clause 6.6 and 6.11 with invoking the capabilities provided by the 3rd Party |
pCR revised to S1-254384 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254237 | Updating to clause 6.32 on disaster rescue planning enabled by network AI Agents |
pCR revised to S1-254332 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254238 | Update to clause 6.7 use case on AI-agents communication |
pCR revised to S1-254416 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254239 | Update to clause 6.44 on customized service provisioning based on AI Agents |
pCR revised to S1-254492 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254240 | Update to clause 6.17 on the Intelligent Communication Assistant |
pCR revised to S1-254390 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254241 | Update to clause 6.30 on smart healthcare | pCR | Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254242 | pCR on updating definition of SHE (Service Hosting Environment) |
pCR revised to S1-254303 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254243 | New Study on Wireless Power Transfer |
SID new revision of S1-254031 revised to S1-254314 |
Huawei Technologies Sweden AB | Rel-21 |
S1-112 AI: 4 |
revised | [WTS] [JSN] | ||
| S1-254244 | Consolidation of AI Functional Requirements | pCR | Qualcomm Korea | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254245 | Pseudo-CR on privacy and personal data | pCR | Vodafone | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254246 | Use Case on Gesture Recognition in Industrial Environments – Update |
pCR revised to S1-254402 |
Siemens AG, OTE, InterDigital | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254247 | New Use Case on Robots Collaborating in Sensing in Smart Factories – Re-submission |
pCR revised to S1-254396 |
Siemens AG, OTE, InterDigital | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254248 | New Use Case on 6G-enabled Decentralized Smart Grid Control – Re-submission |
pCR revised to S1-254428 |
Siemens AG, EDF | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
revised | [WTS] [JSN] |
| S1-254249 | Use Case on Cooperating Mobile Robots – Update |
pCR revised to S1-254472 |
Siemens | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
revised | [WTS] [JSN] |
| S1-254250 | Comments on Consolidated requirements - Part 1 | other | Qualcomm Incorporated |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] | |||
| S1-254251 | Comments on Consolidated requirements - Part 2 | other | Qualcomm Incorporated |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] | |||
| S1-254252 | Consolidation of Sensing Functional Requirements | pCR | Qualcomm Korea | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254253 | Pseudo-CR on update of use case on 6G-enabled decentralized grid power contract |
pCR revised to S1-254473 |
EDF Recherche et Développement, NOVAMINT, Itron | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
revised | [WTS] [JSN] |
| S1-254254 | KPI_table_for_Sensing |
pCR revised to S1-254326 |
Telefonica Germany GmbH | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254255 | Resubmission of the Use case on Digital Twins under Immersive Communications | SID new | Reliance Jio | Rel-20 |
S1-112 AI: 8.1.6.2 |
noted | [WTS] [JSN] | ||
| S1-254256 | Resubmission of the Use case on ISAC for IIoT |
pCR revised to S1-254397 |
Reliance Jio | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254257 | Resubmission of the Use case on Supporting multiple security mechanisms in 6G | SID new | Reliance Jio | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] | ||
| S1-254258 | Resubmission of the Use case on Defining Small cells for 6G |
pCR revised to S1-254404 |
Reliance Jio | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
revised | [WTS] [JSN] |
| S1-254259 | Privacy requirement Editor's Note | pCR | Apple | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
merged | [WTS] [JSN] |
| S1-254260 | New Use Case on Personal Data Usage |
pCR revised to S1-254279 |
Apple | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254261 | Definition of sensing KPIs | discussion | Apple |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] | |||
| S1-254262 | Proposed Clarification on sensing-based positioning |
pCR revised to S1-254399 |
LG Electronics Inc. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254263 | Associating Accuracy Requirements with Maximum Range | discussion | Apple |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] | |||
| S1-254264 | Reply LS on business model and architecture for SNPN cellular hotspots |
LS out revised to S1-254312 |
Cisco Systems | Rel-20 |
S1-112 AI: 3 |
revised | [WTS] [JSN] | ||
| S1-254265 | Update on Network Slicing | pCR | Nokia, Verizon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
merged | [WTS] [JSN] |
| S1-254266 | pCR on consolidated performance requirements for Ubiqiutous Connectivity |
pCR revised to S1-254327 |
Nokia (Moderator) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254267 | Update reference to resolve EN in Clause 5.5.4 | pCR | Lenovo, Motorola Mobility | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254268 | AI use cases summary | pCR | Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254269 | New use case on sensing during health assistance call |
pCR revised to S1-254398 |
Philips International B.V. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254270 | Pseudo-CR on Use Case on Spectrum Scanning to Support Disaster Recovery |
pCR revised to S1-254419 |
DISA, FirstNet, AT&T, Cohere Technologies, CableLabs, Erillisverkot | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.9.2 |
revised | [WTS] [JSN] |
| S1-254271 | Pseudo-CR on Enhancements for Resilient Networks |
pCR revised to S1-254440 |
US DHS Science & Technology, DISA, FirstNet | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.1 |
revised | [WTS] [JSN] |
| S1-254272 | Pseudo-CR on Enhancements on Network Slicing | pCR | DISA, FirstNet | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
merged | [WTS] [JSN] |
| S1-254273 | End-User and Subscriber Terminology | discussion | Apple |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] | |||
| S1-254274 | Update use case 5.7.1 on FWA | pCR | Philips International B.V. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254275 | New Use Case: Use Case on Collaborative Mixed Reality Co-Design using XR Immersive Communication | pCR | Xiaomi Communications | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.2 |
noted | [WTS] [JSN] |
| S1-254276 | New use case on improved communication for cooperating UEs |
pCR revised to S1-254405 |
Philips International B.V., Qualcomm Incorporated | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
revised | [WTS] [JSN] |
| S1-254277 | New use case on AI agent assisted backward compatibility enhancement | pCR | Philips International B.V. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254278 | New use case on event-based inter-operator reselection coordination |
pCR revised to S1-254406 |
LG Uplus, SK Telecom, Thales, Novamint | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
revised | [WTS] [JSN] |
| S1-254279 | New Use Case on Personal Data Usage |
pCR revision of S1-254260 |
Apple, CableLabs, MediaTek, AT&T | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254280 | Pseudo-CR on Annex related to satellite/NTN |
pCR revision of S1-254214 revised to S1-254433 |
Novamint, Thales, TNO, ESA | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
revised | [WTS] [JSN] |
| S1-254281 | Resubmission of a use case on NTN based Sensing of space debris |
pCR revision of S1-254034 revised to S1-254392 |
TNO, Airbus, ESA, Fraunhofer, Thales, Novamint | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254282 | Resubmission of use case on NTN based high-altitude UAV supervision |
pCR revision of S1-254035 revised to S1-254393 |
TNO, Airbus, ESA, Fraunhofer, Thales, Novamint | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
revised | [WTS] [JSN] |
| S1-254283 | Resubmission of use case on NTN based detection of ships in the open sea |
pCR revision of S1-254036 |
TNO, Airbus, ESA, Fraunhofer, Thales, Novamint | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] |
| S1-254284 | Resubmission of use case on NTN based Atmospheric monitoring and weather alerts |
pCR revision of S1-254037 |
TNO, Airbus, ESA, Fraunhofer, Thales, Novamint | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] |
| S1-254285 | Pseudo-CR on Real time traffic offloading using HAPS in a time specific requirement on a geographically challenging area |
pCR revision of S1-254038 revised to S1-254449 |
CEWiT, Tejas Network Limited, Softbank Corp. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
revised | [WTS] [JSN] |
| S1-254286 | Pseudo-CR on Positioning Service for Network Optimization |
pCR revision of S1-254039 |
CEWiT, Tejas | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254287 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254288 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254289 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254290 | Harmonized slide for SA1 | other | ETSI MCC |
S1-112 AI: 1.1 |
noted | [WTS] [JSN] | |||
| S1-254291 | Merged Proposed changes on Clauses Y.1.1 to Y.1.7 (Basic Services & Capabilities) |
pCR revision of S1-254191 revised to S1-254411 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254292 | Merged Proposed changes on clause Y.1.8 |
pCR revised to S1-254339 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254293 | Merged Proposed changes on clause Y.1.9 |
pCR revised to S1-254340 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254294 | Merged Proposed changes on Clause Y.1.10 (ISAC) |
pCR revised to S1-254328 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254295 | Merged Proposed changes on Clause Y.1.11 (Ubiquitous) |
pCR revised to S1-254412 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254296 | Merged Proposed changes on Clause Y.1.12 (Immersive) |
pCR revision of S1-254190 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254297 | Merged Proposed changes on clause Y.1.13 | pCR | 6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] |
| S1-254298 | Merged Proposed changes on clause Y.1.14 | pCR | 6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254299 | Pseudo-CR on update of clause 5.8.6 |
pCR revision of S1-254091 revised to S1-254363 |
ZTE, China Mobile, China Telecom, TNO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254300 | Change structure of TR 22.870 | other | Huawei |
S1-112 AI: 8.1. |
noted | [WTS] [JSN] | |||
| S1-254301 | New use case on 6G provide companion robot on-demand customized services |
pCR revision of S1-254224 revised to S1-254444 |
Huawei, HiSilicon, China Mobile, KPN, China Telecom, Turkcell, OPPO, NEC, Turk Telekom | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254302 | Pseudo-CR on TTFT and its importance for AI inference latency |
pCR revision of S1-254231 |
Huawei, HiSilicon, China Mobile? | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254303 | Pseudo-CR on updating definition of SHE (Service Hosting Environment) |
pCR revision of S1-254242 revised to S1-254415 |
Huawei, HiSilicon, Rakuten, OPPO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254304 | Updated use case on optimizing user experience for GenAI applications |
pCR revision of S1-254058 revised to S1-254381 |
OPPO, China Mobile, China Unicom, Tencent, BUPT, Toyota, Futurewei, Transsion Holdings, Pengcheng Laboratory | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254305 | Reply LS on external data channel content access requirements |
LS out revised to S1-254311 |
Chinamobile |
S1-112 AI: 3 |
revised | [WTS] [JSN] | |||
| S1-254306 | LS reply on PWS for NB-IOT |
LS out revision of S1-254105 revised to S1-254494 |
Qualcomm Incorporated | Rel-19 |
S1-112 AI: 3 |
revised | [WTS] [JSN] | ||
| S1-254307 | CR on PWS clarifications_R19 |
CR revision of S1-254106 |
Qualcomm Incorporated | 22.268 19.1.0 CR#911 catF | TEI19 | Rel-19 |
S1-112 AI: 3 |
agreed | [WTS] [JSN] |
| S1-254308 | CR on PWS clarifications_R20 mirror |
CR revision of S1-254107 |
Qualcomm Incorporated | 22.268 20.0.0 CR#921 catA | TEI19 | Rel-20 |
S1-112 AI: 3 |
agreed | [WTS] [JSN] |
| S1-254309 | [DRAFT] Reply LS on issues related to support of IMS voice over NB-IoT NTN connected to EPC |
LS out revision of S1-254109 revised to S1-254496 |
Qualcomm Incorporated | Rel-20 |
S1-112 AI: 3 |
revised | [WTS] [JSN] | ||
| S1-254310 | CR on IMS Voice over GEO clarifications |
CR revision of S1-254110 revised to S1-254495 |
Qualcomm Incorporated | 22.261 20.4.0 CR#8521 catF | 5GSAT_Ph4-REQ | Rel-20 |
S1-112 AI: 3 |
revised | [WTS] [JSN] |
| S1-254311 | Reply LS to SA (cc SA2, SA3, SA4, SA6, CT) on external data channel content access requirements |
LS out revision of S1-254305 revised to S1-254497 |
Chinamobile |
S1-112 AI: 3 |
revised | [WTS] [JSN] | |||
| S1-254312 | Reply LS to SA3 on business model and architecture for SNPN cellular hotspots |
LS out revision of S1-254264 revised to S1-254498 |
Cisco Systems | Rel-20 |
S1-112 AI: 3 |
revised | [WTS] [JSN] | ||
| S1-254313 | LS answer to SA5 (cc SA) on Rel-20 5GA OAM and Charging related requirements in SA1 |
LS out revised to S1-254499 |
KPN and SA1 chair |
S1-112 AI: 3 |
revised | [WTS] [JSN] | |||
| S1-254314 | New Study on Wireless Power Transfer |
WID new revision of S1-254243 |
Huawei | Rel-21 |
S1-112 AI: 3 |
noted | [WTS] [JSN] | ||
| S1-254315 | New WID Feasibility Study on 5G Requirements Simplification for 6G |
SID new revision of S1-254173 revised to S1-254510 |
Samsung | Rel-21 |
S1-112 AI: 4 |
revised | [WTS] [JSN] | ||
| S1-254316 | Access category for Unattended Data Trafficbackground traffic |
CR revision of S1-254202 revised to S1-254500 |
SK Telecom, LG Uplus, Verizon, Huawei, Hisilicon, China Unicom, China Telecom, vivo, NTT DOCOMO | 22.261 20.4.0 CR#8571 catB | DUMMY | Rel-20 |
S1-112 AI: 4 |
revised | [WTS] [JSN] |
| S1-254317 | New miniWID on Access Category for Unattended Data Trafficbackground traffic |
WID new revision of S1-254203 revised to S1-254380 |
SK Telecom | Rel-20 |
S1-112 AI: 4 |
revised | [WTS] [JSN] | ||
| S1-254318 | 22.261v17.15.0 Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revision of S1-254184 revised to S1-254501 |
ZTE | 22.261 17.15.0 CR#8531 catF | TEI17, 5GSAT | Rel-17 |
S1-112 AI: 4 |
revised | [WTS] [JSN] |
| S1-254319 | 22.261v18.18.0 Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revision of S1-254185 revised to S1-254502 |
ZTE | 22.261 18.18.0 CR#8541 catA | TEI17, 5GSAT | Rel-18 |
S1-112 AI: 5 |
revised | [WTS] [JSN] |
| S1-254320 | 22.261v19.12.0 Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revision of S1-254186 revised to S1-254503 |
ZTE | 22.261 19.12.0 CR#8551 catA | TEI17, 5GSAT | Rel-19 |
S1-112 AI: 5 |
revised | [WTS] [JSN] |
| S1-254321 | 22.261v20.4.0 Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revision of S1-254187 revised to S1-254504 |
ZTE | 22.261 20.4.0 CR#8561 catA | TEI17, 5GSAT | Rel-20 |
S1-112 AI: 5 |
revised | [WTS] [JSN] |
| S1-254322 | Consolidation of KPI requirements on Massive Communication |
pCR revision of S1-254099 |
KDDI CORPORATION (Moderator) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 5 |
not treated | [WTS] [JSN] |
| S1-254323 | Consolidation of KPI requirements on Further Use Cases on Industry and Verticals |
pCR revision of S1-254104 revised to S1-254513 |
KDDI CORPORATION (Moderator) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254324 | Consolidation of KPI requirements on immersive section |
pCR revision of S1-254023 |
Moderator | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] |
| S1-254325 | Consolidation of KPI requirements on AI section |
pCR revision of S1-254024 |
Moderator | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] |
| S1-254326 | Pseudo-CR on consolidated performance requirements for Integrated Sensing and Communication |
pCR revision of S1-254254 |
Telefonica (Moderator) | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] |
| S1-254327 | Pseudo-CR on consolidated performance requirements for Ubiqiutous Connectivity |
pCR revision of S1-254266 |
Nokia (Moderator), CATT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] |
| S1-254328 | Merged Proposed changes on Clause Y.1.10 (ISAC) |
pCR revision of S1-254294 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254329 | Not used | other | Not used |
S1-112 AI: 8.1. |
withdrawn | [WTS] [JSN] | |||
| S1-254330 | Fix EN on diverse UE types 5.10.1 |
pCR revision of S1-254207 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 12 |
approved | [WTS] [JSN] |
| S1-254331 | Understanding of Consent | pCR | Apple | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254332 | Pseudo-CR on updating 6.32 Use case on disaster rescue planning enabled by network AI Agents |
pCR revision of S1-254237 |
Huawei, HiSilicon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254333 | UE accessing 6G services from partner PLMNs |
pCR revision of S1-254220 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254334 | Fix EN on use case 5.5.8 on security control enhancement with NDT in 6G network |
pCR revision of S1-254016 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254335 | Removing Clause 5.7.1.2 Editor s Note on FWA |
pCR revision of S1-254019 |
T-Mobile USA | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254336 | Update to IMS multimedia telephony service |
pCR revision of S1-254123 |
NEC, Deutsche Telekom, ZTE | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254337 | UC 5.8.2 Use case on energy efficiency of 6G system with multiple |
pCR revision of S1-254021 |
Thales, Novamint | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254338 | User Consent Discussion | pCR | Vodafone | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254339 | Merged Proposed changes on clause Y.1.8 |
pCR revision of S1-254292 revised to S1-254490 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254340 | Merged Proposed changes on clause Y.1.9 |
pCR revision of S1-254293 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] |
| S1-254341 | Proposed Way forward on User Consent |
pCR revised to S1-254413 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254342 | Pseudo-CR on update of use case 6.48 on service robot for power grid |
pCR revision of S1-254059 |
ZTE, China Telecom, China Unicom | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254343 | System and Operation Aspects | report | Drafting Session Chair |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] | |||
| S1-254344 | Agenda Drafting AI | report | Drafting Session Chair |
S1-112 AI: 11.1 |
approved | [WTS] [JSN] | |||
| S1-254345 | FS_6G Status report | report | China Mobile, T-Mobile USA |
S1-112 AI: 11.1 |
noted | [WTS] [JSN] | |||
| S1-254346 | New use case on 6G system assisted physical AI training data generation |
pCR revision of S1-254223 |
Huawei, HiSilicon, China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 11.2 |
noted | [WTS] [JSN] |
| S1-254347 | Update to clause 5.7.7 IMS Media Related Service |
pCR revision of S1-254177 |
China Unicom, Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254348 | Remove EN in section 5.9.2 |
pCR revision of S1-254114 |
vivo, T-Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254349 | Use case on of an Autonomous Network Management a request to study |
pCR revision of S1-254128 revised to S1-254434 |
Verizon, Samsung, AT&T, T-Mobile USA, Deutsche Telekom, China Mobile, NTT DOCOMO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254350 | New Use Case on critical communication infrastructure during a power outage situation |
pCR revision of S1-254167 |
KPN, TNO, Telefonica, Philips, Thales | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254351 | New Use case on Energy-aware data collection considering UE preference |
pCR revision of S1-254188 revised to S1-254435 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254352 | Use case on digital twin for AI operation |
pCR revision of S1-254061 |
ZTE | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254353 | Update of clause 5.9.2 use case on efficient data collection and control for 6G system |
pCR revision of S1-254232 |
Huawei, China Mobile, CATT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254354 | Additional requirement(s) for 5.3 Support of non-3GPP access |
pCR revision of S1-254030 |
LG Electronics | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254355 | Pseudo-CR on Update of 5.5.1 for multi-party trust scenarios |
pCR revision of S1-254199 |
Deutsche Telekom, Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254356 | Update data exposure service use case 5.5.5 |
pCR revision of S1-254047 |
Nokia, CEWIT, Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254357 | Update on Unified Access Control (UAC) in clause 5.7.6 |
pCR revision of S1-254205 |
SK Telecom, Qualcomm Incorporated, LG Uplus, LG Electronics | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254358 | Update on case on network sharing on radio access network with sensing capability |
pCR revision of S1-254075 |
CMCC | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254359 | Update Use case 5.8.1 on end-to-end energy efficiency improvement for the network and UE |
pCR revision of S1-254211 |
Nokia, InterDigital, DSIT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254360 | Update efficient data collection use case 5.9.2 |
pCR revision of S1-254078 |
Nokia, InterDigital | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
noted | [WTS] [JSN] |
| S1-254361 | updated use case for efficient data collection and consumption for 6G system |
pCR revision of S1-254156 |
NTT DOCOMO, Huawei, vivo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254362 | New use case on 6G system providing Token Communication service |
pCR revision of S1-254222 revised to S1-254366 |
Huawei, HiSilicon, China Unicom, China Mobile, KPN, Rakuten, Turk Telecom, OPPO, Pengcheng Laboratory, BUPT, Sony, | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254363 | Pseudo-CR on update of clause 5.8.6 |
pCR revision of S1-254299 |
ZTE, China Mobile, China Telecom, TNO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254364 | Solving two editor s note s in 6.38 AI for disability |
pCR revision of S1-254157 revised to S1-254447 |
Ericsson | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] |
| S1-254365 | Use case on Supporting dynamic QoS and network resource efficiency considering AI service |
pCR revision of S1-254100 revised to S1-254448 |
LG Electronics, China Unicom, T-Mobile USA, AT&T, LG Uplus | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.1 |
revised | [WTS] [JSN] |
| S1-254366 | New use case on 6G system providing Token Communication service |
pCR revision of S1-254362 revised to S1-254437 |
Huawei, HiSilicon, China Unicom, China Mobile, KPN, Rakuten, Turk Telecom, OPPO, Pengcheng Laboratory, BUPT, Sony, | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254367 | Use case on AI-enabled satellite-UAV collaborative emergency service |
pCR revision of S1-254210 |
BUPT, Pengcheng Laboratory, CMCC, China Telecom, ZGC Institute of | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254368 | Use case on 6G AI Agents collaboration for disaster rescue |
pCR revision of S1-254213 |
BUPT, Pengcheng Laboratory, ZGC XNET, CMCC, Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254369 | New use case on 6G system provide secure environment as 6G service enabler |
pCR revision of S1-254221 |
Huawei, HiSilicon, KPN, IIT Bombay, Orange | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254370 | Resubmission of New use case on AI-driven LCS for Lost Detection |
pCR revision of S1-254067 revised to S1-254438 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254371 | New use case on feasible intent achievement for AI agents |
pCR revision of S1-254090 |
Xiaomi, ETRI | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254372 | New use case on AI agent assisted rescue in the water park |
pCR revision of S1-254093 revised to S1-254443 |
Xiaomi, China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254373 | Use case on knowledge-enhanced disaster rescue |
pCR revision of S1-254155 |
Pengcheng Laboratory, BUPT, ZGC Institute of Ubiquitous-X Innovation and Application,OPPO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254374 | New use case on Multi-MNO Cooperative Service Continuity in Disaster |
pCR revision of S1-254183 |
Turkcell, Huawei, Lenovo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254375 | Use case on AI-native joint source-channel optimization for high-rate media and sensing |
pCR revision of S1-254196 revised to S1-254442 |
Pengcheng Laboratory, BUPT, ZGC Institute of Ubiquitous-X Innovation and Application, AsiaInfo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254376 | Use Case on Two-Sided AI Agent Communication with Common Knowledge |
pCR revision of S1-254208 |
Pengcheng Laboratory, BUPT, ZGC Institute of Ubiquitous-X Innovation and Application, OPPO | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254377 | 6GS support of distributed AI model inferencing |
pCR revision of S1-254226 |
Huawei, HiSilicon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254378 | Pseudo-CR on solving ENs in intent definition |
pCR revision of S1-254066 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254379 | Revised Definition of AI Service |
pCR revision of S1-254087 |
Qualcomm Incorporated | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254380 | New miniWID on Access Category for delay tolerant service |
WID new revision of S1-254317 |
SK Telecom | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] | ||
| S1-254381 | Updated use case on optimizing user experience for GenAI applications |
pCR revision of S1-254304 |
OPPO, China Mobile, China Unicom, Tencent, BUPT, Toyota, Futurewei, Transsion Holdings, Pengcheng Laboratory, CATT, | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 4 |
approved | [WTS] [JSN] |
| S1-254382 | Use Case on Enhanced Multi-Access Connectivity |
pCR revision of S1-254032 |
NICT, Deutsche Telekom, Thales, Novamint, NEC, TNO, Sharp, Eutelsat, EDF, Viasat, ESA, SES, Airbus, Netherlands Police, Hispasat, JSAT, Philips, Terrestar, Gilat, SyncTechno Inc., EchoStar, Boost Mobile Network, Lockheed Martin, Skylo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254383 | Pseudo-CR on updating 6.11 the built-in Intelligent Communication Assistant Use Case |
pCR revision of S1-254068 |
China Mobile; | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
approved | [WTS] [JSN] |
| S1-254384 | Pseudo-CR on update Clause 6.6 and 6.11 with invoking the capabilities provided by the 3rd Party |
pCR revision of S1-254236 |
Huawei, HiSilicon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254385 | Pseudo-CR on updating 6.22 the Intelligent calling services |
pCR revision of S1-254069 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254386 | pCR on updating 6.32 |
pCR revision of S1-254070 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254387 | pCR on updating 6.45 Use case on flexible UE-Network coordination through AI Agent(s) |
pCR revision of S1-254088 revised to S1-254445 |
China Unicom, Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254388 | Update on Use case 6.24 distributed 6G network for AI computing |
pCR revision of S1-254108 |
SoftBank, NEC, Rakuten Mobile, NVIDIA, Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254389 | Updated use case 6.7 on AI agents communication |
pCR revision of S1-254179 revised to S1-254446 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254390 | Pseudo-CR on update clause 6.17 Intelligent Communication Assistant |
pCR revision of S1-254240 |
Huawei, HiSilicon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254391 | Use case on sensing result confidence monitoring |
pCR revision of S1-254089 revised to S1-254394 |
ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254392 | Resubmission of a use case on Satellite based Sensing of space objects |
pCR revision of S1-254281 |
TNO, Airbus, ESA, Fraunhofer, Thales, Novamint | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] |
| S1-254393 | Resubmission of use case on High-altitude UAV supervision |
pCR revision of S1-254282 |
TNO, Airbus, ESA, Fraunhofer, Thales, Novamint | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] |
| S1-254394 | Use case on sensing result confidence monitoring |
pCR revision of S1-254391 |
ZTE Corporation | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
agreed | [WTS] [JSN] |
| S1-254395 | updated pCR for New use case UE sensor groups |
pCR revision of S1-254217 |
Xiaomi Communications | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
withdrawn | [WTS] [JSN] |
| S1-254396 | New Use Case on Robots Collaborating in Sensing in Smart Factories Re-submission |
pCR revision of S1-254247 |
Siemens, OTE, InterDigital | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
approved | [WTS] [JSN] |
| S1-254397 | Resubmission of the use case on ISAC for IIoT |
pCR revision of S1-254256 |
22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] | |
| S1-254398 | New use case on sensing during health assistance call |
pCR revision of S1-254269 |
Philips International B.V. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] |
| S1-254399 | Proposed Clarification on sensing-based positioning |
pCR revision of S1-254262 |
LG Electronics | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
approved | [WTS] [JSN] |
| S1-254400 | updated pCR New Use Case for Efficient Sensing service delivery to sensor groups |
pCR revision of S1-254218 |
Xiaomi Communications | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
noted | [WTS] [JSN] |
| S1-254401 | Report Sensing drafting sessions | report | Drafting Session Chair |
S1-112 AI: 8.1.4.2 |
approved | [WTS] [JSN] | |||
| S1-254402 | Use case on Gesture Recognition in Industrial Environments Update |
pCR revision of S1-254246 |
Siemens, OTE, InterDigital | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 11.1 |
approved | [WTS] [JSN] |
| S1-254403 | Update 8.17 UC on 6G Satellite backhaul |
pCR revision of S1-254119 |
CATT, CSCN, China Telecom | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.4.2 |
approved | [WTS] [JSN] |
| S1-254404 | Resubmission of the Use case on Defining Small cells for 6G |
pCR revision of S1-254258 |
Reliance Jio | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.1 |
agreed | [WTS] [JSN] |
| S1-254405 | Resubmission of use case on improved communication services for cooperating UEs |
pCR revision of S1-254276 |
Philips International B.V., Qualcomm Incorporated, LG Electronics | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
approved | [WTS] [JSN] |
| S1-254406 | New use case on Event-based Inter-PLMN Coordination |
pCR revision of S1-254278 |
LG Uplus, SK Telecom, Thales, Novamint | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
approved | [WTS] [JSN] |
| S1-254407 | Updated use case 8.7 on low-power positioning |
pCR revision of S1-254076 |
Nokia, AT&T, ESA, Thales, Novamint, Airbus | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
approved | [WTS] [JSN] |
| S1-254408 | Update of KPI table for use case 8.8 global mobile video |
pCR revision of S1-254234 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
approved | [WTS] [JSN] |
| S1-254409 | Proposed Steps after SA1#112 |
report revision of S1-254008 |
SA1 Chair & MCC |
S1-112 AI: 8.1.5.2 |
noted | [WTS] [JSN] | |||
| S1-254410 | Initial Consolidation Status after SA1 #112 | pCR | 6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 2 |
endorsed | [WTS] [JSN] |
| S1-254411 | Merged Proposed changes on Clauses Y.1.1 to Y.1.7 (Basic Services & Capabilities) |
pCR revision of S1-254291 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
merged | [WTS] [JSN] |
| S1-254412 | Merged Proposed changes on Clause Y.1.11 (Ubiquitous) |
pCR revision of S1-254295 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
not treated | [WTS] [JSN] |
| S1-254413 | Proposed Way forward on User Consent |
pCR revision of S1-254341 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
noted | [WTS] [JSN] |
| S1-254414 | Cover sheet for TR 22.870 |
TS or TR cover revised to S1-254516 |
Rapporteur (Xiaonan Shi, China Mobile, Jean Trakinat, T-Mobile USA) | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
revised | [WTS] [JSN] | |
| S1-254415 | Pseudo-CR on updating definition of SHE (Service Hosting Environment) |
pCR revision of S1-254303 |
Huawei, HiSilicon, Rakuten, OPPO, NEC | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 11.2 |
noted | [WTS] [JSN] |
| S1-254416 | Pseudo-CR on Update of clause 6.7 use case on AI-Agents communication |
pCR revision of S1-254238 |
Huawei, HiSilicon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254417 | Pseudo-CR on Use case on Immersive Audio Production in Live Events |
pCR revision of S1-254079 |
SHURE Europe GmbH | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254418 | Use case on Joint QoS handling for 6G Service |
pCR revision of S1-254086 |
Qualcomm Incorporated, T-Mobile USA | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.1 |
approved | [WTS] [JSN] |
| S1-254419 | Pseudo-CR on Use Case on Spectrum Scanning to Support Disaster Recovery |
pCR revision of S1-254270 |
DISA, FirstNet, AT&T, Cohere Technologies, CableLabs, Erillisverkot | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.2 |
approved | [WTS] [JSN] |
| S1-254420 | Update UC 9.5 to clean editor s notes |
pCR revision of S1-254171 |
TNO, China Mobile, Erillisverkot | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.9.2 |
agreed | [WTS] [JSN] |
| S1-254421 | Update 9.8 UC on holographic telepresence in healthcare |
pCR revision of S1-254118 |
CATT | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.1 |
agreed | [WTS] [JSN] |
| S1-254422 | New use case for Gas and Water Metering |
pCR revision of S1-254017 |
Ericsson, Itron, AT&T, Verizon, Sony, Nokia, EDF | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.6.1 |
noted | [WTS] [JSN] |
| S1-254423 | Update Utility use case 10.3 |
pCR revision of S1-254018 |
Ericsson, Itron, AT&T, Verizon, Qualcomm, Sony, EDF, Nokia, KPN, Philips | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.7.2 |
approved | [WTS] [JSN] |
| S1-254424 | Pseudo-CR on updating utility use case in clause 11.25 |
pCR revision of S1-254125 |
Verizon, AT&T, Vodafone, Sony, Interdigital, Ericsson, Mediatek, EDF, Itron | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.7.2 |
approved | [WTS] [JSN] |
| S1-254425 | Pseudo-CR on KPI update on Utility Direct Transfer Trip |
pCR revision of S1-254126 |
Verizon, EDF, NOVAMINT, Itron | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
approved | [WTS] [JSN] |
| S1-254426 | pCR on use case: Use case on task driven network communication for vertical users |
pCR revision of S1-254057 |
CMCC | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
approved | [WTS] [JSN] |
| S1-254427 | New Use Case on Medical applications in 6G |
pCR revision of S1-254168 |
TNO, Telefonica, Phillips | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
agreed | [WTS] [JSN] |
| S1-254428 | New Use Case on 6G-enabled Decentralized Smart Grid Control Re-submission |
pCR revision of S1-254248 revised to S1-254454 |
Siemens, EDF | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
revised | [WTS] [JSN] |
| S1-254429 | Update on Use Case 11.5 Immersive media services for advanced air mobility (AAM) enabled by 6G NTN |
pCR revision of S1-254028 |
LG Electronics | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
agreed | [WTS] [JSN] |
| S1-254430 | Editorial Cleanup |
pCR revision of S1-254052 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
approved | [WTS] [JSN] |
| S1-254431 | Proposed Text for Clause 4 (Overview) |
pCR revision of S1-254083 |
6G Study Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
approved | [WTS] [JSN] |
| S1-254432 | Update to sustainability overview |
pCR revision of S1-254077 |
Nokia, Orange, EDF | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
noted | [WTS] [JSN] |
| S1-254433 | Pseudo-CR on Annex related to satellite/NTN |
pCR revision of S1-254280 |
Novamint, Thales, TNO, ESA, SoftBank Corp. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
approved | [WTS] [JSN] |
| S1-254434 | Use case on of an Autonomous Network Management a request to study |
pCR revision of S1-254349 revised to S1-254451 |
Verizon, Samsung, AT&T, T-Mobile USA, Deutsche Telekom, China Mobile, NTT DOCOMO, Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.1 |
revised | [WTS] [JSN] |
| S1-254435 | New Use case on Energy-aware data collection considering UE preference |
pCR revision of S1-254351 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254436 | Updates related to Cooperating UEs |
pCR revision of S1-254101 |
Qualcomm, Meta, Philips, Verizon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254437 | New use case on 6G system providing Token Communication serviceen LCS for Lost Detection |
pCR revision of S1-254366 |
Huawei, HiSilicon, China Unicom, China Mobile, KPN, Rakuten, Turk Telecom, OPPO, Pengcheng Laboratory, BUPT, Sony, Toyota, IIT Bombay, Telecom Italia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
approved | [WTS] [JSN] |
| S1-254438 | Resubmission of New use case on AI-driven LCS for Lost Detection |
pCR revision of S1-254370 |
China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254439 | Report for Drafting Immersive + Others session | report | Drafting Chair China Unicom) |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] | |||
| S1-254440 | Pseudo-CR on Enhancements for Resilient Networks |
pCR revision of S1-254271 |
US DHS Science & Technology, DISA, FirstNet | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 11.1 |
approved | [WTS] [JSN] |
| S1-254441 | Report of sessions on Ubiquitous | report | Drafting Chair (Nokia) |
S1-112 AI: 8.1.5.1 |
approved | [WTS] [JSN] | |||
| S1-254442 | Use case on AI-native joint source-channel optimization for high-rate media and sensing |
pCR revision of S1-254375 |
Pengcheng Laboratory, BUPT, ZGC Institute of Ubiquitous-X Innovation and Application, AsiaInfo | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 11.1 |
noted | [WTS] [JSN] |
| S1-254443 | New use case on AI agent assisted rescue in the water park |
pCR revision of S1-254372 revised to S1-254453 |
Xiaomi, China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254444 | New use case on 6G provide companion robot on-demand customized |
pCR revision of S1-254301 |
Huawei, HiSilicon, China Mobile, KPN, China Telecom, Turkcell, NEC, Turk | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
noted | [WTS] [JSN] |
| S1-254445 | pCR on updating 6.45 Use case on flexible UE-Network coordination through AI Agent(s) |
pCR revision of S1-254387 |
China Unicom, Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
agreed | [WTS] [JSN] |
| S1-254446 | Updated use case 6.7 on AI agents communication |
pCR revision of S1-254389 |
Nokia, Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
agreed | [WTS] [JSN] |
| S1-254447 | Solving two editor s note s in 6.38 AI for disability |
pCR revision of S1-254364 revised to S1-254452 |
Ericsson | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254448 | Use case on Supporting dynamic QoS and network resource efficiency considering AI service |
pCR revision of S1-254365 |
LG Electronics, China Unicom, T-Mobile USA, AT&T, LG Uplus | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.1 |
approved | [WTS] [JSN] |
| S1-254449 | Pseudo-CR on Real time traffic offloading using HAPS in a time specific requirement on a geographically challenging area |
pCR revision of S1-254285 |
CEWiT, Tejas Network Limited, Softbank Corp. | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
agreed | [WTS] [JSN] |
| S1-254450 | Use case on energy saving of AI-native system |
pCR revision of S1-254060 |
ZTE, China Telecom | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.5.2 |
noted | [WTS] [JSN] |
| S1-254451 | Use case on of an Autonomous Network Management a request to study |
pCR revision of S1-254434 |
Verizon, Samsung, AT&T, T-Mobile USA, Deutsche Telekom, China Mobile, NTT DOCOMO, Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254452 | PCR for solving editors notes in 6.38 AI for disability |
pCR revision of S1-254447 |
Ericsson | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.2 |
withdrawn | [WTS] [JSN] |
| S1-254453 | New use case on AI agent assisted rescue in the water park |
pCR revision of S1-254443 |
Xiaomi, China Mobile | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.1 |
approved | [WTS] [JSN] |
| S1-254454 | New Use Case on 6G-enabled Decentralized Smart Grid Control – Re-submission |
pCR revision of S1-254428 |
Siemens AG, EDF | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
agreed | [WTS] [JSN] |
| S1-254455 | Not used | other | Not used |
S1-112 AI: 8.1.8.2 |
withdrawn | [WTS] [JSN] | |||
| S1-254456 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254457 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254458 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254459 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254460 | Drafting Report for General Drafting Session | report | Drafting Session Chair (Erik Guttman) |
S1-112 AI: 12 |
approved | [WTS] [JSN] | |||
| S1-254461 | Not used | other | Not used |
S1-112 AI: 11.1 |
withdrawn | [WTS] [JSN] | |||
| S1-254462 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254463 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254464 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254465 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254466 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254467 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254468 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254469 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254470 | Use Case on smart manufacturing enabled by diverse autonomous robots |
pCR revision of S1-254050 |
Orange | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 12 |
approved | [WTS] [JSN] |
| S1-254471 | Pseudo-CR on updated use case of real time digital twins |
pCR revision of S1-254065 |
Nokia | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.2 |
approved | [WTS] [JSN] |
| S1-254472 | Use Case on Cooperating Mobile Robots Update |
pCR revision of S1-254249 |
Siemens | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
approved | [WTS] [JSN] |
| S1-254473 | Pseudo-CR on update of use case on 6G-enabled decentralized grid power contract |
pCR revision of S1-254253 revised to S1-254507 |
EDF, Novamint, Itron | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
revised | [WTS] [JSN] |
| S1-254474 | Update on Use Case 11.9 Use case on collaborative awareness in dynamic environments - enhancing mutual decision-making |
pCR revision of S1-254029 |
LG Electronics | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.8.1 |
noted | [WTS] [JSN] |
| S1-254475 | Drafting group report for Massive & Verticals | report | Drafting Session Chair |
S1-112 AI: 8.1.8.2 |
approved | [WTS] [JSN] | |||
| S1-254476 | Not used | other | Not used |
S1-112 AI: 11.1 |
withdrawn | [WTS] [JSN] | |||
| S1-254477 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254478 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254479 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254480 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254481 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254482 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254483 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254484 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254485 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254486 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254487 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254488 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254489 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254490 | Merged proposed changes on clause Y.1.8 |
pCR revision of S1-254339 |
TR Rapporteurs | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 12 |
merged | [WTS] [JSN] |
| S1-254491 | Pseudo-CR on update clause 6.9 collaborative AI agents |
pCR revision of S1-254233 revised to S1-254505 |
Huawei, HiSilicon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1. |
revised | [WTS] [JSN] |
| S1-254492 | Pseudo-CR on updating clause 6.44 on customized service provisioning based on AI Agents with results sharing |
pCR revision of S1-254239 revised to S1-254506 |
Huawei, HiSilicon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
revised | [WTS] [JSN] |
| S1-254493 | Agenda Drafting Table Y.1.1-1 Consolidation | pCR | Drafting Session Chair | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
endorsed | [WTS] [JSN] |
| S1-254494 | LS reply to RAN2, CT1 (cc SA2) on PWS support in NB-IoT terrestrial networks |
LS out LS To: RAN2, CT1 revision of S1-254306 |
SA1 | Rel-19 |
S1-112 AI: 8.1. |
approved | [WTS] [JSN] | ||
| S1-254495 | CR on IMS Voice over GEO clarifications |
CR revision of S1-254310 |
Qualcomm Incorporated | 22.261 20.4.0 CR#8522 catF | 5GSAT_Ph4-REQ | Rel-20 |
S1-112 AI: 3 |
agreed | [WTS] [JSN] |
| S1-254496 | LS reply to SA2 (cc RAN2, SA4, CT1, SA3, RAN1) on IMS voice over NB-IoT NTN connected to EPC |
LS out revision of S1-254309 revised to S1-254508 |
SA1/Qualcomm Incorporated | Rel-20 |
S1-112 AI: 3 |
revised | [WTS] [JSN] | ||
| S1-254497 | Reply LS to SA (cc SA2, SA3, SA4, SA6, CT) on external data channel content access requirements |
LS out revision of S1-254311 revised to S1-254509 |
Chinamobile |
S1-112 AI: 3 |
revised | [WTS] [JSN] | |||
| S1-254498 | Reply LS to SA3 on business model and architecture for SNPN cellular hotspots |
LS out LS To: SA3 revision of S1-254312 |
SA1 | Rel-20 |
S1-112 AI: 3 |
approved | [WTS] [JSN] | ||
| S1-254499 | LS answer to SA5 (cc SA) on Rel-20 5GA OAM and Charging related requirements in SA1 |
LS out LS To: SA5 revision of S1-254313 |
SA1 |
S1-112 AI: 3 |
approved | [WTS] [JSN] | |||
| S1-254500 | Access category for delay tolerant service |
CR revision of S1-254316 |
SK Telecom, LG Uplus, Verizon, Huawei, Hisilicon, China Unicom, China Telecom, vivo, NTT DOCOMO | 22.261 20.4.0 CR#8572 catB | DUMMY | Rel-20 |
S1-112 AI: 3 |
noted | [WTS] [JSN] |
| S1-254501 | Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revision of S1-254318 |
ZTE | 22.261 17.15.0 CR#8532 catF | TEI17, 5GSAT | Rel-17 |
S1-112 AI: 3 |
agreed | [WTS] [JSN] |
| S1-254502 | Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revision of S1-254319 |
ZTE | 22.261 18.18.0 CR#8542 catA | TEI17, 5GSAT | Rel-18 |
S1-112 AI: 4 |
agreed | [WTS] [JSN] |
| S1-254503 | Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revision of S1-254320 |
ZTE | 22.261 19.12.0 CR#8552 catA | TEI17, 5GSAT | Rel-19 |
S1-112 AI: 5 |
agreed | [WTS] [JSN] |
| S1-254504 | Correction on the end-to-end latency via satellite in clause 7.4.2 |
CR revision of S1-254321 |
ZTE | 22.261 20.4.0 CR#8562 catA | TEI17, 5GSAT | Rel-20 |
S1-112 AI: 5 |
agreed | [WTS] [JSN] |
| S1-254505 | Pseudo-CR on update clause 6.9 collaborative AI agents |
pCR revision of S1-254491 |
Huawei, HiSilicon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 5 |
agreed | [WTS] [JSN] |
| S1-254506 | Pseudo-CR on updating clause 6.44 on customized service provisioning based on AI Agents with results sharing |
pCR revision of S1-254492 revised to S1-254511 |
Huawei, HiSilicon | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 5 |
revised | [WTS] [JSN] |
| S1-254507 | Pseudo-CR on update of use case on 6G-enabled decentralized grid power contract |
pCR revision of S1-254473 |
EDF, Novamint, Itron | 22.87 0.3.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] |
| S1-254508 | LS reply to SA2 (cc RAN2, SA4, CT1, SA3, RAN1) on IMS voice over NB-IoT NTN connected to EPC |
LS out LS To: SA2 revision of S1-254496 |
SA1 | Rel-20 |
S1-112 AI: 8.1.3.2 |
approved | [WTS] [JSN] | ||
| S1-254509 | Reply LS to SA (cc SA2, SA3, SA4, SA6, CT) on external data channel content access requirements |
LS out LS To: SA revision of S1-254497 |
SA1 |
S1-112 AI: 8.1.8.1 |
approved | [WTS] [JSN] | |||
| S1-254510 | New WID "Feasibility Study on 5G Requirements Simplification for 6G" |
SID new revision of S1-254315 revised to S1-254520 |
Samsung Electronics GmbH | Rel-21 |
S1-112 AI: 3 |
revised | [WTS] [JSN] | ||
| S1-254511 | Update to clause 6.44 on customized service provisioning based on AI Agents |
pCR revision of S1-254506 |
Huawei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 3 |
agreed | [WTS] [JSN] |
| S1-254512 | Pseudo-CR on update use case of network slicing |
pCR revision of S1-254192 |
ZTE Corporation, Deutsche Telekom, China Mobile, Telefonica, Huawei, China Unicom, Futurewei | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 3 |
approved | [WTS] [JSN] |
| S1-254513 | Consolidation of KPI requirements on Further Use Cases on Industry and Verticals |
pCR revision of S1-254323 |
KDDI CORPORATION (Moderator)323 | 22.87 0.4.1 | FS_6G_REQ | Rel-20 |
S1-112 AI: 4 |
not treated | [WTS] [JSN] |
| S1-254514 | TR 22.870 | draft TR | Rapporteur (Xiaonan Shi, China Mobile, Jean Trakinat, T-Mobile USA) | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1.3.2 |
agreed | [WTS] [JSN] | |
| S1-254515 | Not used | other | Not used |
S1-112 AI: 8.1.2 |
withdrawn | [WTS] [JSN] | |||
| S1-254516 | Cover sheet for TR 22.870 |
TS or TR cover revision of S1-254414 |
Rapporteur (Xiaonan Shi, China Mobile, Jean Trakinat, T-Mobile USA) | FS_6G_REQ | Rel-20 |
S1-112 AI: 8.1 |
agreed | [WTS] [JSN] | |
| S1-254517 | Not used | other | Not used |
S1-112 AI: 11.2 |
withdrawn | [WTS] [JSN] | |||
| S1-254518 | Not used | other | Not used |
S1-112 AI: 12 |
withdrawn | [WTS] [JSN] | |||
| S1-254519 | Discussion on the use of Time-To-First-Token (TTFT) in SA1 for 6G AI inference service |
discussion revision of S1-254230 |
Huawei | FS_6G_REQ |
S1-112 AI: 11.2 |
noted | [WTS] [JSN] | ||
| S1-254520 | New WID "Feasibility Study on 5G Requirements Simplification for 6G" |
SID new revision of S1-254510 |
Samsung Electronics GmbH | Rel-21 |
S1-112 AI: 12 |
agreed | [WTS] [JSN] |
521 documents (1.264436006546 seconds)