Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-1914300 | Agenda for RAN2#108 | agenda | Chairman |
R2-108 AI: 2.1 |
approved | [WTS] [JSN] | |||
R2-1914301 | RAN2#107bis Meeting Report | report | MCC |
R2-108 AI: 2.2 |
approved | [WTS] [JSN] | |||
R2-1914302 | LS on channel quality report for LTE-MTC (R1-1911386; contact: Samsung) |
LS in source LS: R1-1911386 LS To: RAN2, RAN4 |
RAN1 | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1914303 | LS on support of high peak data rate for Cat-M1 UEs in HD-FDD (R1-1911398; contact: Qualcomm) |
LS in source LS: R1-1911398 LS To: RAN2 |
RAN1 | TEI16 | Rel-16 |
R2-108 AI: 3 |
noted | [WTS] [JSN] | |
R2-1914304 | LS on PUR transmission for NB-IoT/eMTC (R1-1911399; contact: Futurewei) |
LS in LS is reply to R2-1908196 source LS: R1-1911399 LS To: RAN2 LS reply in R2-1916426, R2-1916435 |
RAN1 | NB_IOTenh3, LTE_eMTC5 | Rel-16 |
R2-108 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R2-1914305 | LS on PDCCH-based Power Saving Signal/Channel carrying indication of UE wakeup before DRX ON (R1-1911475; contact: CATT) |
LS in source LS: R1-1911475 LS To: RAN2 |
RAN1 | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.1 |
noted | [WTS] [JSN] | |
R2-1914306 | LS on NR IAB case-1 timing (R1-1911548; contact: ZTE) |
LS in source LS: R1-1911548 LS To: RAN2 |
RAN1 | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.1 |
noted | [WTS] [JSN] | |
R2-1914307 | LS on UE higher layer signalling for cross-slot scheduling (R1-1911586; contact: MediaTek) |
LS in source LS: R1-1911586 LS To: RAN2 revised to R2-1916373 |
RAN1 | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.1 |
noted | [WTS] [JSN] | |
R2-1914308 | LS on simultaneous TCI state activation and spatial relation update across multiple CCs/BWPs by MAC-CE (R1-1911617; contact: LGE) |
LS in source LS: R1-1911617 LS To: RAN2 |
RAN1 | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.1 |
noted | [WTS] [JSN] | |
R2-1914309 | LS on SCell BFR (R1-1911619; contact: Apple) |
LS in source LS: R1-1911619 LS To: RAN2 |
RAN1 | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.1 |
noted | [WTS] [JSN] | |
R2-1914310 | LS on SRS for NR Positioning (R1-1911634; contact: Intel) |
LS in source LS: R1-1911634 LS To: RAN2, RAN3 |
RAN1 | NR_pos | Rel-16 |
R2-108 AI: 6.8.1 |
noted | [WTS] [JSN] | |
R2-1914311 | Reply to LS on differentiating between MSG2 and MSGB (R1-1911656; contact: Nokia) |
LS in LS is reply to R2-1914191 source LS: R1-1911656 LS To: RAN2 |
RAN1 | NR_2step_RACH | Rel-16 |
R2-108 AI: 6.13.1 |
noted | [WTS] [JSN] | |
R2-1914312 | LS on UE power saving terminology and text proposal to 38.300 (R1-1911667; contact: CATT) |
LS in source LS: R1-1911667 LS To: RAN2 revised to R2-1914360 |
RAN1 | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.1 |
revised | [WTS] [JSN] | |
R2-1914313 | Reply LS on propagation delay compensation for reference time information delivery (R1-1911693; contact: Nokia) |
LS in LS is reply to R2-1908160 source LS: R1-1911693 LS To: RAN2 |
RAN1 | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.1 |
noted | [WTS] [JSN] | |
R2-1914314 | LS on signalling of sidelink RSRP and CSI between UEs (R1-1911698; contact: LGE) |
LS in source LS: R1-1911698 LS To: RAN2 |
RAN1 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914315 | Reply LS on SL RLM/RLF (R1-1911699; contact: InterDigital) |
LS in source LS: R1-1911699 LS To: RAN2 |
RAN1 | 5G_V2X_NRSL | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914316 | Reply LS on additional PDCCH monitoring occasions for paging for NR-U (R1-1911705; contact: ZTE) |
LS in LS is reply to R2-1911861 source LS: R1-1911705 LS To: RAN2 |
RAN1 | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.1 |
noted | [WTS] [JSN] | |
R2-1914317 | LS on NR V2X synchronization procedures (R1-1911718; contact: CATT) |
LS in source LS: R1-1911718 LS To: RAN2 |
RAN1 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914318 | Reply LS on UL-SL prioritization (R1-1911720; contact: OPPO) |
LS in LS is reply to R2-1911679 source LS: R1-1911720 LS To: RAN2, RAN4 LS reply in R2-1916462, R2-1916466, R2-1916468 |
RAN1 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914319 | Reply to LS on RAN2 agreements related to 2-step RACH (R1-1911739; contact: Nokia) |
LS in LS is reply to R2-1911862 source LS: R1-1911739 LS To: RAN2 |
RAN1 | NR_2step_RACH | Rel-16 |
R2-108 AI: 6.13.1 |
noted | [WTS] [JSN] | |
R2-1914320 | Reply LS on ambiguity of UE L1 FDD/TDD FR1/FR2 capabilities (R1-1911741; contact: ZTE) |
LS in LS is reply to R2-1911858 source LS: R1-1911741 LS To: RAN2 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1914321 | LS on Rel-16 LTE and NR parameter lists (R1-1911745; contact: Qualcomm) |
LS in source LS: R1-1911745 LS To: RAN2, RAN3 |
RAN1 | LTE_eMTC5-Core, NB_IOTenh3-Core, LTE_DL_MIMO_EE-Core, LTE_terr_bcast-Core, NR_2step_RACH-Core, NR_unlic-Core, NR_IAB-Core, 5G_V2X_NRSL-Core, NR_L1enh_URLLC-Core, NR_IIOT-Core, NR_eMIMO-Core, NR_UE_pow_sav-Core, NR_pos-Core, NR_Mob_enh-Core, LTE_NR_DC_CA_enh | Rel-16 |
R2-108 AI: 3 |
noted | [WTS] [JSN] | |
R2-1914322 | LS on additional high layer information for sidelink physical layer operations (R1-1911746; contact: LGE) |
LS in source LS: R1-1911746 LS To: RAN2 LS reply in R2-1916443, R2-1916458 |
RAN1 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914323 | LS on aspects of Mission Critical Services over 5MBS (S6-192003; contact: AT&T) |
LS in source LS: S6-192003 LS To: SA, RAN, SA2, RAN2, RAN3 |
SA6 | FS_MC5MBS | Rel-17 |
R2-108 AI: 3 |
noted | [WTS] [JSN] | |
R2-1914324 | LS Reply on maximum value of MDBV (C3-194330; contact: Nokia) |
LS in LS is reply to S2-1907955 source LS: C3-194330 LS To: SA2 |
CT3 | 5GS_Ph1 | Rel-16 |
R2-108 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1914325 | LS on CLI measurement reporting range (R4-1911416; contact: LGE) |
LS in source LS: R4-1911416 LS To: RAN2 |
RAN4 | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
withdrawn | [WTS] [JSN] | |
R2-1914326 | LS on NID structure and length (C4-194332; contact: Ericsson) |
LS in source LS: C4-194332 LS To: RAN2, RAN3, CT1, CT3 LS reply in R2-1916336, R2-1916344 |
CT4 | Vertical_LAN | Rel-16 |
R2-108 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1914327 | LS on NR IAB case-1 timing (R1-1911548; contact: ZTE) |
LS in source LS: R1-1911548 LS To: RAN2 |
RAN1 | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.1 |
withdrawn | [WTS] [JSN] | |
R2-1914328 | LS to SA3 on False Base Station Detection (R3-196256; contact: Huawei) |
LS in LS is reply to S3-193175 source LS: R3-196256 LS To: SA3 |
RAN3 | FS_5GFBS | Rel-16 |
R2-108 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1914329 | LS on PRACH configuration conflict detection (R3-196270; contact: CATT) |
LS in source LS: R3-196270 LS To: RAN1, RAN2 |
RAN3 | NR_SON_MDT | Rel-16 |
R2-108 AI: 6.12.1 |
noted | [WTS] [JSN] | |
R2-1914330 | LS on resource coordination between NG-RAN nodes for NR V2X sidelink communication (R3-196280; contact: Ericsson) |
LS in source LS: R3-196280 LS To: RAN2 LS reply in R2-1916444, R2-1916459 |
RAN3 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914331 | LS on IP assignment in IAB network (R3-196284; contact: Samsung) |
LS in source LS: R3-196284 LS To: RAN2 |
RAN3 | NR_IAB | Rel-16 |
R2-108 AI: 6.1.1 |
noted | [WTS] [JSN] | |
R2-1914332 | Reply LS on CSI-RS configuration transfer (R3-196288; contact: China Telecom) |
LS in LS is reply to R2-1911855 source LS: R3-196288 LS To: RAN2 LS reply in R2-1916528 |
RAN3 | TEI16 | Rel-16 |
R2-108 AI: 6.20.3 |
noted | [WTS] [JSN] | |
R2-1914333 | LS on CLI measurement reporting range (R4-1911416; contact: LGE) |
LS in source LS: R4-1911416 LS To: RAN2 |
RAN4 | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
noted | [WTS] [JSN] | |
R2-1914334 | Reply LS on definition for SFTD measurement (R4-1912704; contact: Apple) |
LS in LS is reply to R1-1909819 source LS: R4-1912704 LS To: RAN1 |
RAN4 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1914335 | Reply LS on SFTD measurement (R4-1912705; contact: Intel) |
LS in LS is reply to R2-1911700 source LS: R4-1912705 LS To: RAN2 |
RAN4 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1914336 | LS on NR Mobility Enhancements (R4-1912707; contact: Intel) |
LS in source LS: R4-1912707 LS To: RAN2 |
RAN4 | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.1 |
noted | [WTS] [JSN] | |
R2-1914337 | LS Response on the feasibility of time synchronization accuracy requirements and related testing (R4-1912743; contact: Nokia |
LS in LS is reply to R1-1909906 source LS: R4-1912743 LS To: RAN1, RAN2 |
RAN4 | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.1 |
noted | [WTS] [JSN] | |
R2-1914338 | Reply LS on second SMTC periodicity in idle mode (R4-1912744; contact: Orange) |
LS in LS is reply to R2-1911840 source LS: R4-1912744 LS To: RAN2 |
RAN4 | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1914339 | LS on thresholds for serving cell RSRP change based TA validation in PUR (R4-1912782; contact: Huawei) |
LS in source LS: R4-1912782 LS To: RAN2 |
RAN4 | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R2-1914340 | LS on sidelink synchronization under multiple synchronization sources with different timing (R4-1912826; contact: Qualcomm) |
LS in source LS: R4-1912826 LS To: RAN2 LS reply in R2-1916465 |
RAN4 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914341 | LS reply on NR V2X cross-RAT configuration (R4-1912874; contact: Huawei) |
LS in LS is reply to R2-1911680 source LS: R4-1912874 LS To: RAN2 |
RAN4 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914342 | LS on sync raster for NR V2X (R4-1913063; contact: Vivo, CATT) |
LS in source LS: R4-1913063 LS To: RAN1, RAN2 |
RAN4 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914343 | Reply LS on mapping between LTE V2X PPPP and NR V2X priority (S2-1909987; contact: Qualcomm) |
LS in LS is reply to R1-1909876 source LS: S2-1909987 LS To: RAN1 |
SA2 | eV2XARC | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914344 | Reply LS on LS on the IAB-indication to core network (S2-1910281; contact: Qualcomm) |
LS in LS is reply to R3-194787 source LS: S2-1910281 LS To: RAN3 |
SA2 | IABARC | Rel-16 |
R2-108 AI: 6.1.1 |
noted | [WTS] [JSN] | |
R2-1914345 | LS on IAB terminology update (S2-1910349; contact: Nokia) |
LS in source LS: S2-1910349 LS To: RAN2, RAN3 |
SA2 | IABARC | Rel-16 |
R2-108 AI: 6.1.1 |
noted | [WTS] [JSN] | |
R2-1914346 | Reply LS on assistance indication for WUS (S2-1910549; contact: Qualcomm) |
LS in LS is reply to R2-1911589 source LS: S2-1910549 LS To: RAN2, CT1, RAN3 LS reply in R2-1916433, R2-1916436, R2-1916438, R2-1916440 |
SA2 | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R2-1914347 | Reply LS on LTE-M identification in 5GC (S2-1910644; contact: Orange) |
LS in source LS: S2-1910644 LS To: RAN2, RAN3 LS reply in R2-1901540 |
SA2 | 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1914348 | Reply LS on LS on maximum value of MDBV (S2-1910663; contact: Qualcomm) |
LS in LS is reply to R3-194553 source LS: S2-1910663 LS To: RAN3, CT4, CT3 |
SA2 | 5GS_Ph1 | Rel-15 |
R2-108 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1914349 | LS Reply on Handling of multiple PLMN-assigned capability IDs (S2-1910680; contact: vivo) |
LS in LS is reply to R2-1911854 source LS: S2-1910680 LS To: RAN2 |
SA2 | RACS-RAN, RACS | Rel-16 |
R2-108 AI: 6.5.1 |
noted | [WTS] [JSN] | |
R2-1914350 | Reply LS on Sidelink HARQ Feedback for Groupcast (S2-1910771; contact: LGE) |
LS in LS is reply to R1-1909879 source LS: S2-1910771 LS To: RAN1, RAN2 LS reply in R2-2000184, R2-2000613 |
SA2 | eV2XARC, 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914351 | Reply LS on NID structure and length (S2-1910784; contact: Ericsson) |
LS in LS is reply to C4-194332 source LS: S2-1910784 LS To: RAN2, RAN3, CT1, CT4 |
SA2 | Vertical_LAN | Rel-15 |
R2-108 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1914352 | LS on dependencies on AS design for mobility management aspects of NTN in 5GS (S2-1910786; contact: Qualcomm) |
LS in source LS: S2-1910786 LS To: RAN2, RAN3 |
SA2 | FS_5GSAT_ARCH | Rel-16 |
R2-108 AI: 6.6.1 |
noted | [WTS] [JSN] | |
R2-1914353 | LS on system level design assumptions for satellite in 5GS (S2-1910787; contact: Qualcomm) |
LS in source LS: S2-1910787 LS To: RAN2, RAN3 |
SA2 | FS_5GSAT_ARCH | Rel-16 |
R2-108 AI: 6.6.1 |
noted | [WTS] [JSN] | |
R2-1914354 | Reply LS on RRC Connection Reestablishment for CP for NB-IoT connected to 5GC (S2-1910789; contact: Huawei) |
LS in LS is reply to S3-192394 source LS: S2-1910789 LS To: RAN2, CT4, SA3 |
SA2 | 5G_CIoT | Rel-16 |
R2-108 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R2-1914355 | Reply LS on clarifications on Private Networks (S2-1910803; contact: Ericsson) |
LS in LS is reply to R3-194786 source LS: S2-1910803 LS To: RAN3, SA1 |
SA2 | Vertical_LAN, NG_RAN_PRN | Rel-16 |
R2-108 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1914356 | Reply LS on Mobile-terminated Early Data Transmission (S2-1910804; contact: OPPO) |
LS in source LS: S2-1910804 LS To: RAN2, RAN3, RAN |
SA2 | 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1914357 | LS on PC5S and PC5 RRC unicast message protection (S3-193802; contact: Qualcomm) |
LS in source LS: S3-193802 LS To: RAN2, SA2, CT1 LS reply in R2-1916446, R2-1916461 |
SA3 | FS_eV2X_Sec | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914358 | Reply on QoE Measurement Collection (S4-191234; contact: Ericsson) |
LS in LS is reply to S5-195659 source LS: S4-191234 LS To: SA5 |
SA4 | QOED | Rel-16 |
R2-108 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1914359 | LS on energy efficiency (S5-196771; contact: Orange) |
LS in source LS: S5-196771 LS To: RAN3 |
SA5 | EE_5G | Rel-16 |
R2-108 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1914360 | LS on UE power saving terminology and text proposal to 38.300 (R1-1911667; contact: CATT) |
LS in source LS: R1-1911667 LS To: RAN2 revision of R2-1914312 |
RAN1 | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.1 |
noted | [WTS] [JSN] | |
R2-1914361 | Discussion on RAN2 impacts of async CA | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.7 |
noted | [WTS] [JSN] | |
R2-1914362 | CR to 38.331 on support of cross-carrier scheduling with different numerology | draftCR | Qualcomm Incorporated, ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.6 |
noted | [WTS] [JSN] | |
R2-1914363 | Remaining issues of dormancy behaviour | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1914364 | Further discussion on suspension of SCG | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1914365 | Remaining Issues on RACH Procedure in NR-U | discussion | vivo |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | |||
R2-1914366 | Issues on the Autonomous BWP Switching in NR-U |
discussion revision of R2-1912178 revised to R2-2000146 |
vivo |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | |||
R2-1914367 | Remaining Issues of UL LBT Failure |
discussion revised to R2-2000148 |
vivo |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |||
R2-1914368 | LBT Impacts on 2-step RACH |
discussion revision of R2-1912179 revised to R2-2000147 |
vivo |
R2-108 AI: 6.2.2.3 |
available | [WTS] [JSN] | |||
R2-1914369 | CAPC Restriction to SRB Multiplexing Using Configured Grant |
discussion revision of R2-1912181 |
vivo |
R2-108 AI: 6.2.2.6 |
available | [WTS] [JSN] | |||
R2-1914370 | Further Consideration on RAR reception in NR-U |
discussion revised to R2-2000145 |
vivo |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | |||
R2-1914371 | Support of Multiple Active SPS | discussion | vivo |
R2-108 AI: 6.2.2.7 |
noted | [WTS] [JSN] | |||
R2-1914372 | Further Discussion on the Whitelist in NR-U |
discussion revision of R2-1912184 |
vivo |
R2-108 AI: 6.2.3.2 |
noted | [WTS] [JSN] | |||
R2-1914373 | Differentiation Between Msg2 and MsgB by MsgB-RNTI | discussion | vivo |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |||
R2-1914374 | Discussion on the 2-step CFRA | discussion | vivo |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |||
R2-1914375 | Contention Resolution of 2-step RACH Triggered by Uplink Data Arrival Without Valid TA | discussion | vivo |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |||
R2-1914376 | Remaining Issues on MsgA Transmission and Fallback | discussion | vivo |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |||
R2-1914377 | Resource Selection for 2-step RACH |
discussion revision of R2-1912189 revised to R2-2000142 |
vivo |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |||
R2-1914378 | Discussion on the BFR-initiated 2-step RACH | discussion | vivo |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |||
R2-1914379 | UE capability of Rel-16 DCCA enhancement | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.7 |
available | [WTS] [JSN] | |
R2-1914380 | Remaining issues of NR early measurements | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
noted | [WTS] [JSN] | |
R2-1914381 | Discussion on fast SCell activation based on Aperiodic TRS (A-TRS) | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1914382 | Remaining issues of Scell BFR | discussion | CATT | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
noted | [WTS] [JSN] | |
R2-1914383 | On Remaining Open Issues of IAB BH RLF | discussion | CATT | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |
R2-1914384 | On Hop-by-Hop Flow control for IAB BH | discussion | CATT | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | |
R2-1914385 | On Remaining Open Issues of IAB Routing | discussion | CATT | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |
R2-1914386 | Cell restriction for CA duplication | discussion | OPPO | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1914387 | Draft CR for MAC CE format to indicate up to two TCI states | draftCR | OPPO | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
available | [WTS] [JSN] | |
R2-1914388 | Remaining open issues for 2-step RACH | discussion | OPPO | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1914389 | Draft TP for msgB MAC PDU format | draftCR | OPPO | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1914390 | Remaining issues on 2-step RACH configuration without 4-step resources | discussion | OPPO | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.3 |
available | [WTS] [JSN] | |
R2-1914391 | Contention resolution for 2-step RACH in C-RNTI MAC CE case | discussion | OPPO | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1914392 | Contention free 2-step RACH | discussion | OPPO | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1914393 | Text proposal on power saving impacts on TS 37.340 | draftCR | OPPO | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.1 |
available | [WTS] [JSN] | |
R2-1914394 | Remaining issues on PDCCH-based WUS | discussion | OPPO | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1914395 | Impacts of power saivng signalling on CSI reporting | discussion | OPPO | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1914396 | [Draft] LS on preamble group for 2-step RACH |
LS out LS To: RAN1 |
OPPO | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1914397 | RRM relaxation for power saving | discussion | OPPO | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1914398 | Text proposal for NR-U impacts on TS 37.340 | draftCR | OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.1 |
reserved | [WTS] [JSN] | |
R2-1914399 | LBT aware UL BWP selection for RACH in NR-U | discussion | OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | |
R2-1914400 | Remaining issues on consistent uplink LBT failure for NR-U | discussion | OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
noted | [WTS] [JSN] | |
R2-1914401 | 2-step RACH for NR-U | discussion | OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.3 |
available | [WTS] [JSN] | |
R2-1914402 | DRX procedure enhancements due to LBT impacts | discussion | OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.4 |
available | [WTS] [JSN] | |
R2-1914403 | Remaining issues on NR-U configured grant | discussion | OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.5 |
noted | [WTS] [JSN] | |
R2-1914404 | CAPC for CG when SRB is multiplexed | discussion | OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.6 |
noted | [WTS] [JSN] | |
R2-1914405 | Discussion RAN1 LS on supporting multiple frequency domain monitoring locations for a searchspace | discussion | OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.7 |
noted | [WTS] [JSN] | |
R2-1914406 | Stopping criteria for paging monitoring | discussion | OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.1 |
available | [WTS] [JSN] | |
R2-1914407 | Discussion on SSB measurement configuration with UE mobility | discussion | China Unicom |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |||
R2-1914408 | Open Issues of Reference Timing Delivery | discussion | CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |
R2-1914409 | Remaining Issues of Multiple SPS/CG Configurations | discussion | CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | |
R2-1914410 | Discussion on Ethernet Header Compression | discussion | CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |
R2-1914411 | Intra-UE prioritization framework considering RAN1/RAN2 agreements |
discussion revised to R2-2000486 |
CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
noted | [WTS] [JSN] | |
R2-1914412 | Handling of Dropped MAC PDU | discussion | CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1914413 | MAC PDU Priority Determination |
discussion revision of R2-1912211 |
CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |
R2-1914414 | Equal-priority Handling |
discussion revision of R2-1912212 |
CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |
R2-1914415 | The Prioritization between MAC CEs and UL Data |
discussion revision of R2-1912216 |
CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |
R2-1914416 | Primary Path and Initial State for PDCP Duplication | discussion | CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
noted | [WTS] [JSN] | |
R2-1914417 | Discussion on Duplication MAC CE |
discussion revision of R2-1912219 |
CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1914418 | LCH-to-Cell Restriction in Rel-16 |
discussion revised to R2-2000119 |
CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1914419 | Discussion on UE based Duplication Activation/Deactivation |
discussion revision of R2-1912220 |
CATT | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.2 |
available | [WTS] [JSN] | |
R2-1914420 | MAC upgrade for SR dropping in PHY |
discussion revision of R2-1912221 revised to R2-2000120 |
CATT, Qualcomm Inc. | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | ||
R2-1914421 | On the remaining open issues of 2-step RACH | discussion | CATT | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1914422 | Load Balancing between RACH Types | discussion | CATT, OPPO, vivo, Spreadtrum, Panasonic, Xiaomi | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.3 |
noted | [WTS] [JSN] | |
R2-1914423 | Consideration on msgB-RNTI | discussion | CATT | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1914424 | RA Type Selection between Legacy CFRA and 2-step CBRA |
discussion revision of R2-1912225 |
CATT | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1914425 | Remaining issues on early measurement | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914426 | Remaining Issues for Extending RAR Window | discussion | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |
R2-1914427 | CAPC Aspects for Scheduling SRB in Configured Grant | discussion | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.6 |
noted | [WTS] [JSN] | |
R2-1914428 | Signaling Multiple UL grants for Msg3 Transmission in NR-U | discussion | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |
R2-1914429 | Draft RRC CR_Supporting RAR Window Size larger than 10ms in NR-U | draftCR | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | |
R2-1914430 | Report of Email discussion 107bis#76- MSG B Format Design | discussion | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1914431 | MAC TP_MSGB Format Design | draftCR | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
endorsed | [WTS] [JSN] | |
R2-1914432 | Legacy CFRA and Selection between 2 step and 4 step RA | discussion | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1914433 | 2 Step RACH_RNTI for Receiving Network Response | discussion | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1914434 | 2 Step RA_RACH Configuration | discussion | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.3 |
available | [WTS] [JSN] | |
R2-1914435 | Open issues for supporting 2 step CFRA | discussion | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1914436 | Impact of Mode 1 Resource Allocation on Uu BWP Operation | discussion | Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1914437 | RRC Connection Initiation Trigger for V2X Sidelink Communication | discussion | Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914438 | RAN2 Aspects of SCell BFR | discussion | Samsung Electronics Co., Ltd | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1914439 | Open Issues for Cell Selection and Reselection of NPN cell | discussion | CATT | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1914440 | Discussion on Connected mode aspects for NPN | discussion | CATT | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.3 |
available | [WTS] [JSN] | |
R2-1914441 | RLM / RLF procedure in NR V2X Sidelink | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1914442 | Resource (Re-) selection function in NR V2X Sidelink | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.4 |
available | [WTS] [JSN] | |
R2-1914443 | Remaining Issues on SL HARQ | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1914444 | Remaining Issues on PDCP | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1914445 | Resource allocation mode configuration | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914446 | Leftover Issues on LCP | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914447 | Leftover Issues for Sidelink Configured Grant | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1914448 | Remaining Issues for Prioritization | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914449 | UE Behavior Clarification during UE States Transition |
discussion revised to R2-1916264 |
CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
revised | [WTS] [JSN] | |
R2-1914450 | Open Issues for the Bi-directional SLRB | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914451 | Discussion on inter-RAT Cell Selection/Reselection | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.7 |
available | [WTS] [JSN] | |
R2-1914452 | Left Issues of SL BSR/SR | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1914453 | Congestion control for NR SL | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1914454 | Type 1 Sidelink Configured Grant Validity Time | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1914455 | Re-consideration on PLMN-wide Filter | discussion | CATT | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.2 |
noted | [WTS] [JSN] | |
R2-1914456 | Draft LS on PLMN-wide Filter |
LS out LS To: SA2, RAN3 |
CATT | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.2 |
available | [WTS] [JSN] | |
R2-1914457 | Proposal about the configurations of validity area for early measurement | discussion | China Unicom |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |||
R2-1914458 | Discussion for early measurement configuration for 2-step resume | discussion | China Unicom |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |||
R2-1914459 | Discussion on SL capability signaling for Uu-RRC and PC5-RRC | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1914460 | Discussion on SL-related Uu-RRC messages | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1914461 | Left issues on HARQ for NR-V2X | discussion | OPPO |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
R2-1914462 | Left issues on CSI report for NR-V2X | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | ||
R2-1914463 | Left issues on UL-SL prioritization for NR-V2X | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | ||
R2-1914464 | Left issues on PC5-S impact on AS-layer | discussion | OPPO |
R2-108 AI: 6.4.5 |
noted | [WTS] [JSN] | |||
R2-1914465 | SL RSRP measurement report via PC5-RRC | discussion | OPPO |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1914466 | Left issues on failure case handling for NR V2X | discussion | OPPO |
R2-108 AI: 6.4.5 |
noted | [WTS] [JSN] | |||
R2-1914467 | Left issues on SLRB configuration | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | ||
R2-1914468 | Signaling design for RAT-Dependent positioning methods | discussion | CATT | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |
R2-1914469 | Broadcast Positioning Procedure in Connected Mode |
discussion revised to R2-1916478 |
CATT | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.3.2 |
revised | [WTS] [JSN] | |
R2-1914470 | Open Issues of Broadcast Positioning Assistance data | discussion | CATT | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.3.1 |
noted | [WTS] [JSN] | |
R2-1914471 | Introduction of B1C signal in BDS system in A-GNSS |
CR revised to R2-1916405 |
CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | 36.355 15.5.0 CR#248 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
revised | [WTS] [JSN] |
R2-1914472 | Discussion on WUS assistance indication LS from SA2 and Rel-15 WUS | discussion | NTT DOCOMO INC. | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
noted | [WTS] [JSN] | |
R2-1914473 | [DRAFT] Reply LS on assistance indication for WUS |
LS out source LS: S2-1910549 LS To: SA2, CT1, RAN3 |
NTT DOCOMO INC. | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | |
R2-1914474 | CE Mode Threshold Adjustments for non-BL and BL UE |
discussion revision of R2-1912229 revised to R2-2000515 |
NTT DOCOMO INC. | Rel-16 |
R2-108 AI: 7.1.13 |
available | [WTS] [JSN] | ||
R2-1914475 | Report of email discussion [107bis#88][NB-IoT R15] | discussion | NTT DOCOMO INC. | NB_IOTenh2-Core | Rel-15 |
R2-108 AI: 4.1 |
noted | [WTS] [JSN] | |
R2-1914476 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | discussion | China Telecommunications | Rel-16 |
R2-108 AI: 6.20.1 |
withdrawn | [WTS] [JSN] | ||
R2-1914477 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | discussion | China Telecommunications | Rel-16 |
R2-108 AI: 6.20.1 |
withdrawn | [WTS] [JSN] | ||
R2-1914478 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | discussion | China Telecommunications | Rel-16 |
R2-108 AI: 6.20.1 |
withdrawn | [WTS] [JSN] | ||
R2-1914479 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | discussion | China Telecommunications | Rel-16 |
R2-108 AI: 6.20.1 |
withdrawn | [WTS] [JSN] | ||
R2-1914480 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | discussion | China Telecommunications | Rel-16 |
R2-108 AI: 6.20.1 |
withdrawn | [WTS] [JSN] | ||
R2-1914481 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | discussion | China Telecommunications | Rel-16 |
R2-108 AI: 6.20.1 |
reserved | [WTS] [JSN] | ||
R2-1914482 | Clarification of PDCCH monitoring when not fully aligned with PDCCH periods |
CR revised to R2-1916421 |
NTT DOCOMO INC. | 36.321 15.7.0 CR#1459 catF | NB_IOTenh2-Core | Rel-15 |
R2-108 AI: 4.1 |
revised | [WTS] [JSN] |
R2-1914483 | Further Considerations on Capability Coordination for DAPS | discussion | CATT | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1914484 | UDC Impacts of DAPS | discussion | CATT | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1914485 | Remaining CP Issues of DAPS | discussion | CATT | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1914486 | Consideration on WA or MCG Fast Recovery Upon RLF | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | |
R2-1914487 | Further Discussions on Cell Evaluation for CHO Cell Selection | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.5 |
available | [WTS] [JSN] | |
R2-1914488 | Coexistence of Simultaneous Connectivity and CHO | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1914489 | Remaining Issues of CHO Configuration | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1914490 | Considerations on IAB multi connectivity |
discussion revision of R2-1913004 |
KDDI Corporation |
R2-108 AI: 6.1.3.1 |
noted | [WTS] [JSN] | |||
R2-1914491 | Discussion on a configuration mismatch between a UE and a target gNB |
discussion revision of R2-1913675 |
KDDI Corporation |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |||
R2-1914492 | Discussion on reselection between NPNs and public networks |
discussion revision of R2-1913005 |
KDDI Corporation |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |||
R2-1914493 | Open Issues on NPN for UE in Inactive | discussion | CATT | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1914494 | Feeder link switch |
discussion revised to R2-1916386 |
CATT | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
revised | [WTS] [JSN] | |
R2-1914495 | Measurement Initiation Issue for NTN System |
discussion revised to R2-1916508 |
CATT | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
revised | [WTS] [JSN] | |
R2-1914496 | Discussion on Location Report | discussion | CATT | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.2 |
available | [WTS] [JSN] | |
R2-1914497 | Consideration on the SPS/CG for NTN | discussion | CATT | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1914498 | TP on Random Access procedure |
draftCR revised to R2-1916505 |
CATT | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1914499 | Leftover Issues for RACH Report Optimization | discussion | CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1914500 | Configuration of Out-of-coverage Logging |
discussion revision of R2-1912143 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1914501 | Recording and Reporting of CEF | discussion | CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1914502 | Failure Indication about SCG | discussion | CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1914503 | Statistic of UL Delay Measurement in UE |
discussion revision of R2-1912145 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1914504 | Uncertainty of L2 Measurement Result Related to URLLC |
discussion revision of R2-1912146 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1914505 | Consideration on Successful HO Report |
discussion revision of R2-1912151 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1914506 | Supporting of Handover Type Indication in RLF Report | discussion | CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1914507 | Report on Email Discussion 107b#85 NRMDT Mobility History | discussion | CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1914508 | Discussion on PRACH coordination |
discussion revised to R2-1916299 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
revised | [WTS] [JSN] | |
R2-1914509 | Reply LS on PRACH configuration conflict detection |
LS out LS To: RAN3 RAN1 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1914510 | FDD and TDD Timing Alignment for Dual Connectivity | discussion | Vodafone |
R2-108 AI: 6.10.7 |
noted | [WTS] [JSN] | |||
R2-1914511 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | discussion | China Telecommunications, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | ||
R2-1914512 | Stage 2 CR for Inter-RAT HO between NR to EN-DC in Rel-16 |
draftCR revised to R2-1916548 |
China Telecommunications, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
revised | [WTS] [JSN] | |
R2-1914513 | Consecutive Conditional Handover |
discussion revision of R2-1912464 |
Apple Inc. | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1914514 | Remaining Issues for IAB Routing |
discussion revision of R2-1913538 |
Futurewei Technologies |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |||
R2-1914515 | PDCP SN continuity support for RLC UM bearers | discussion | Qualcomm Incorporated |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |||
R2-1914516 | Source connection handling during MBB HO | discussion | Qualcomm Incorporated |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |||
R2-1914517 | CHO SN addition/change handling | discussion | Qualcomm Incorporated |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |||
R2-1914518 | CHO SN addition/change failure handling | discussion | Qualcomm Incorporated |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |||
R2-1914519 | Support per DRB MBB HO configuration | discussion | Qualcomm Incorporated |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |||
R2-1914520 | Running Stage-2 CR for NR-U | draftCR | Qualcomm Incorporated | NR_unlic-Core | Rel-15 |
R2-108 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914521 | Running RRC CR for NR-U | draftCR | Qualcomm Incorporated | NR_unlic-Core | Rel-15 |
R2-108 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914522 | RAN2 work plan for UE Power Saving WI | discussion | CATT (rapporteur) | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.1 |
noted | [WTS] [JSN] | |
R2-1914523 | [107bis#69][PowerSaving] Running CR 38.300 (CATT) | discussion | CATT (rapporteur) | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.1 |
endorsed | [WTS] [JSN] | |
R2-1914524 | Remaining issues of PDCCH-WUS | discussion | CATT | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
noted | [WTS] [JSN] | |
R2-1914525 | Impacts of PDCCH-WUS on RRC |
discussion revised to R2-1916278 |
CATT | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
revised | [WTS] [JSN] | |
R2-1914526 | Remaining issues on UE assistance for power saving | discussion | CATT | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1914527 | Reusing overheating fields for SCell assistance information | discussion | CATT, Apple | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1914528 | Measurement Configuration in Inactive Mode and MR-DC | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914529 | Considerations on cell reselection for early measurement reporting | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914530 | Temporary RS utilization for SCell and SpCell |
discussion revised to R2-2001453 |
CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1914531 | Consideration on Dormant SCG State | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1914532 | Signalling enhancement for Inactive state |
discussion revised to R2-2003531 |
CATT | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1914533 | Bearer type negotiation |
discussion revised to R2-2003532 |
CATT | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1914534 | Corrections on CG-Config |
CR revision of R2-1912141 |
CATT | 38.331 15.7.0 CR#12671 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1914535 | Consideration on mode1 resource allocation | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |||
R2-1914536 | Discussion on UL and SL prioritisation | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914537 | Discussion on SL CSI and RSRP report | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
R2-1914538 | Consideration on NR V2X CBR | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914539 | Left issues for MAC in NR V2X | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914540 | Discussion on left issue in NR V2X UP | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914541 | Discussion on NR V2X system information acquisition | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914542 | Discussion on remaining issues on SLRB parameters | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |||
R2-1914543 | Consideration on sidelink RLM management | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914544 | Consideration on exceptional resource pool | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914545 | Consideration on NR V2X cross RAT support | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.7 |
available | [WTS] [JSN] | |||
R2-1914546 | Handling of SLRB when UE RRC states transition | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |||
R2-1914547 | Further discussion on RLC AM and UM for NR V2X unicast | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914548 | Discussion on NR V2X groupcast feedback options | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914549 | Discussion the missing of UE coverage status description in TS38.304 and TS 36.304 | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914550 | Running Idle/Inactive CR for NR-U | draftCR | Qualcomm Incorporated | NR_unlic-Core | Rel-15 |
R2-108 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914551 | Fast Scell activation in sTAG | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1914552 | Introduction of dormancy behavior in NR | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1914553 | Open issues for early measurement | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914554 | Open issues for CLI measurment | discussion | OPPO | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.2 |
available | [WTS] [JSN] | |
R2-1914555 | UE assistance information reporting for RRC_INACTIVE UE | discussion | OPPO | NR_pos | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1914556 | Security algorithom update in RRC reestablishment message | discussion | OPPO,Huawei | NR_newRAT-Core | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1914557 | Correction on RRC Reestablishment procedure | CR | OPPO | 38.331 15.7.0 CR#1351 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.5 |
not treated | [WTS] [JSN] |
R2-1914558 | Correction Release cause for RRC signalling only connection | CR | OPPO | 38.331 15.7.0 CR#1352 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.7 |
not treated | [WTS] [JSN] |
R2-1914559 | Correction on split PDU session | CR | OPPO | 37.34 15.7.0 CR#164 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
not pursued | [WTS] [JSN] |
R2-1914560 | Discussion on Cached Data Handling for INACTIVE UE | discussion | OPPO | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | ||
R2-1914561 | (running)36.304CR on cell selection(reselection) for NR V2X UE | draftCR | ZTE Corporation, Sanechips | 5G_V2X_NRSL-Core | Rel-15 |
R2-108 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1914562 | (running)38.304CR on cell selection(reselection) for NR V2X UE | draftCR | ZTE Corporation, Sanechips | 5G_V2X_NRSL-Core | Rel-15 |
R2-108 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1914563 | CR on NR V2X UE coverage status description in TS 36.304 | draftCR | ZTE Corporation, Sanechips | 5G_V2X_NRSL-Core | Rel-15 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914564 | CR on NR V2X UE coverage status description in TS 38.304 | draftCR | ZTE Corporation, Sanechips | 5G_V2X_NRSL-Core | Rel-15 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914565 | Discussion on DL/UL PRS based positioning | discussion | ZTE Corporation | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | ||
R2-1914566 | Modification to Multi-cell power control | discussion | ZTE Corporation | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | ||
R2-1914567 | Discussion on ECID positioning in NR | discussion | ZTE Corporation | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | ||
R2-1914568 | Draft LS on configuration exchange for CLI measurement |
LS out LS To: RAN3 |
OPPO | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.2 |
available | [WTS] [JSN] | |
R2-1914569 | Draft LS on early measurement configuration during 2 step resume procedure without UE context relocation |
LS out LS To: RAN3 |
OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914570 | Correction of cell reselection parameters for multi-beam operation |
CR revision of R2-1912899 revised to R2-1916510 |
Qualcomm Incorporated, Ericsson | 38.304 15.5.0 CR#1391 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R2-1914571 | Correction on field description of cellReselectionInfoCommon |
CR revision of R2-1912893 |
Qualcomm Incorporated, Ericsson | 38.331 15.7.0 CR#12781 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R2-1914572 | Handling of UL LBT failures | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |
R2-1914573 | Channel Access Priority selection and multiplexing for Configured Grant | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.6 |
available | [WTS] [JSN] | |
R2-1914574 | Multiple Active Configured Grants for NR-u | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.5 |
available | [WTS] [JSN] | |
R2-1914575 | SCell Dormancy operation in NR | discussion | Intel Corporation | LTE_NR_DC_CA_enh-Core |
R2-108 AI: 6.10.4.2 |
noted | [WTS] [JSN] | ||
R2-1914576 | Practical scoping of SCG suspension operation in NR | discussion | Intel Corporation | LTE_NR_DC_CA_enh-Core |
R2-108 AI: 6.10.4.3 |
noted | [WTS] [JSN] | ||
R2-1914577 | Miscellaneous corrections on UE capability fields |
CR revision of R2-1914193 revised to R2-1916507 |
Intel Corporation | 38.306 15.7.0 CR#1862 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1914578 | Clarification on the restriction of maximum SRS resource sets configuration for uplink beam management |
CR revision of R2-1913446 |
Intel Corporation | 38.306 15.7.0 CR#1851 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1914579 | Signaling Support for Frame Based Equipment for NR-u | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.5 |
noted | [WTS] [JSN] | |
R2-1914580 | Measurement gap capability information for Rel-16 UE | discussion | Intel Corporation | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1914581 | Work plan for Rel-16 UE Capability feature list |
discussion revised to R2-1916192 |
Intel Corporation | NR_newRAT-Core | Rel-16 |
R2-108 AI: 6 |
revised | [WTS] [JSN] | |
R2-1914582 | CAPC for RACH and PUCCH in NR-U |
discussion revision of R2-1912455 |
MediaTek Inc. |
R2-108 AI: 6.2.2.6 |
not treated | [WTS] [JSN] | |||
R2-1914583 | On Restrictions in Multiplexing of High and Low Priority LCH in CG |
discussion revision of R2-1912457 |
MediaTek Inc. |
R2-108 AI: 6.2.2.6 |
available | [WTS] [JSN] | |||
R2-1914584 | Including RSSI and Channel Occupancy in NR-U UE Capabilities |
draftCR revised to R2-2000404 |
MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R2-108 AI: 6.2.3.2 |
available | [WTS] [JSN] | |
R2-1914585 | Conditional HO with L2 packet duplication in NR NTN |
discussion revision of R2-1906376 |
MediaTek Inc. |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |||
R2-1914586 | Improving Cell Reselection using Next Cell Information in LEO-NTN |
discussion revision of R2-1912655 |
MediaTek Inc. |
R2-108 AI: 6.6.4.2 |
available | [WTS] [JSN] | |||
R2-1914587 | Configuring Threshold-based Soft Handover in LEO NTN | discussion | MediaTek Inc. |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |||
R2-1914588 | Synchronized Handover without Random Access in LEO NTN | discussion | MediaTek Inc. |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |||
R2-1914589 | On Increasing Number of HARQ Processes in NTN | discussion | MediaTek Inc. |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |||
R2-1914590 | UE CLI Measurements for Multiconnectivity | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-108 AI: 6.15.2 |
available | [WTS] [JSN] | ||
R2-1914591 | Remaning Issues for UE-CLI | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-108 AI: 6.15.2 |
available | [WTS] [JSN] | ||
R2-1914592 | On Release of source cell in DAPS Handover | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | ||
R2-1914593 | Introduction of Rel-16 NB-IoT enhancements |
draftCR revised to R2-1916565 |
Nokia | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R2-1914594 | GWUS Configuration and Resource mapping | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | ||
R2-1914595 | Remaining Issues for PUR | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R2-1914596 | PUR for control plane solution | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R2-1914597 | RNA Configuration | CR | Nokia (Rapporteur) | 38.3 15.7.0 CR#177 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.1 |
not pursued | [WTS] [JSN] |
R2-1914598 | NPN Work Plan |
discussion revision of R2-1912841 revised to R2-2000568 |
Nokia, China Telecom (Rapporteurs) | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1914599 | NPN Stage 2 Draft CR |
draftCR revised to R2-1916337, R2-2000569 |
Nokia (Rapporteur) | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.1 |
revised | [WTS] [JSN] | |
R2-1914600 | LS on Emergency Services in SNPN |
LS out LS To: SA2 |
Nokia (Rapporteur) | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1914601 | Split Threshold for DC and NR-U |
discussion revision of R2-1906041 |
Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.7 |
noted | [WTS] [JSN] | |
R2-1914602 | QoS Flow Handling |
discussion revision of R2-1912846 revised to R2-2000578 |
Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1914603 | MDBV Enforcement |
discussion revision of R2-1912847 revised to R2-2000579 |
Nokia, InterDigital, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1914604 | Notification for Alternative QoS profiles | discussion | Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
postponed | [WTS] [JSN] | |
R2-1914605 | LS on Notification for Alternative QoS profiles |
LS out LS To: SA2 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
postponed | [WTS] [JSN] | |
R2-1914606 | HARQ process ID for deprioritized configured grants | discussion | III | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1914607 | Support the change between normal PDCP entity and DAPS PDCP entity | discussion | Mediatek Inc., Huawei, HiSilicon |
R2-108 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | |||
R2-1914608 | Draft CR for 38.323 to support the change between normal PDCP and DAPS PDCP | draftCR | Mediatek Inc., Huawei, HiSilicon | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1914609 | Draft CR for 36.323 to support the change between normal PDCP and DAPS PDCP | draftCR | Mediatek Inc., Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1914610 | RLC UM handling during DAPS HO | discussion | MediaTek Inc., Apple, vivo, OPPO |
R2-108 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | |||
R2-1914611 | RLC Impacts analysis with DAPS during HO |
discussion revision of R2-1912970 |
Mediatek Inc. | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | ||
R2-1914612 | QoS Flow to DRB Remapping during DAPS HO | discussion | Mediatek Inc., Apple |
R2-108 AI: 6.9.2 |
noted | [WTS] [JSN] | |||
R2-1914613 | draft CR to 37.324 to support QoS flow remapping during DAPS HO | draftCR | Mediatek Inc., Apple | NR_Mob_enh-Core | Rel-15 |
R2-108 AI: 6.9.2 |
available | [WTS] [JSN] | |
R2-1914614 | Correction on reestablishRLC |
CR revision of R2-1912140 |
CATT | 36.331 15.7.0 CR#41021 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.2 |
not treated | [WTS] [JSN] |
R2-1914615 | DRX ambiguous period enhancements for NTN | discussion | Asia Pacific Telecom co. Ltd | FS_NR_NTN_solutions |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | ||
R2-1914616 | Discussion on SCell BFR procedure | discussion | Asia Pacific Telecom co. Ltd | NR_eMIMO-Core |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | ||
R2-1914617 | Discussion on 2-step RACH for BFR | discussion | Asia Pacific Telecom co. Ltd | NR_2step_RACH-Core |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | ||
R2-1914618 | QoS in NR V2X | discussion | Fraunhofer IIS, Fraunhofer HHI |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |||
R2-1914619 | PDCP status reporting in target cell at DAPS handover | discussion | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1914620 | RLC retransmissions to source during DAPS HO |
discussion revision of R2-1912356 |
Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
withdrawn | [WTS] [JSN] | |
R2-1914621 | Specification impact from RLC-UM DAPS support |
discussion revision of R2-1912357 |
Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
withdrawn | [WTS] [JSN] | |
R2-1914622 | Release of source cell at DAPS handover | discussion | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1914623 | Fallback to source cell during DAPS handover | discussion | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1914624 | On the configuration of DAPS handover per DRB | discussion | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
noted | [WTS] [JSN] | |
R2-1914625 | Capability coordination for DAPS handover | discussion | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1914626 | Cell Selection and Reselection aspects of NPN | discussion | Ericsson | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
noted | [WTS] [JSN] | |
R2-1914627 | Connected mode aspects of NPN | discussion | Ericsson | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.3 |
available | [WTS] [JSN] | |
R2-1914628 | SIB1 design for NPN | discussion | Ericsson | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.4 |
available | [WTS] [JSN] | |
R2-1914629 | On skipping supportedBandCombinations for band n90 | discussion | Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.20.3 |
noted | [WTS] [JSN] | |
R2-1914630 | CR to 38.304 on dedicated cell reselection priorities | CR | Ericsson | 38.304 15.5.0 CR#141 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.5.1 |
merged | [WTS] [JSN] |
R2-1914631 | Dummify one of the cellReservedForOperatorUse-CRS-flags | CR | Ericsson | 36.331 15.7.0 CR#4139 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-108 AI: 4.5.1 |
withdrawn | [WTS] [JSN] |
R2-1914632 | [107bis#66][NR/NTN] Running TP (Thales) |
pCR revised to R2-1916376 |
THALES | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.1 |
revised | [WTS] [JSN] |
R2-1914633 | Inputs to TR 38.821 recommendations |
pCR revised to R2-1916379 |
THALES, Nomor, Nokia, Vodafone, Mediatek | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.1 |
revised | [WTS] [JSN] |
R2-1914634 | Remaining open issues for CHO | discussion | Ericsson | NR_Mob_enh-Core |
R2-108 AI: 6.9.3.1 |
noted | [WTS] [JSN] | ||
R2-1914635 | Handling of a HO command while UE is monitoring CHO | discussion | Ericsson | NR_Mob_enh-Core |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | ||
R2-1914636 | Suspend/Release while monitoring CHO in NR | discussion | Ericsson | NR_Mob_enh-Core |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | ||
R2-1914637 | Conditional PSCell addition/change | discussion | Ericsson | NR_Mob_enh-Core |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | ||
R2-1914638 | TP for 38.331 on CHO | draftCR | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1914639 | Further details on CHO failure handling | discussion | Ericsson | NR_Mob_enh-Core |
R2-108 AI: 6.9.3.2 |
noted | [WTS] [JSN] | ||
R2-1914640 | Running CR for Introduction of Even futher Mobility enhancement in E-UTRAN | draftCR | Ericsson | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.1 |
endorsed | [WTS] [JSN] | |
R2-1914641 | Discussion on incoming LSes for QoE measurement collection in LTE | discussion | Ericsson | TEI16 |
R2-108 AI: 7.5 |
noted | [WTS] [JSN] | ||
R2-1914642 | Additions to QoE measurement collection | CR | Ericsson | 36.331 15.7.0 CR#4140 catC | TEI16 | Rel-16 |
R2-108 AI: 7.5 |
not treated | [WTS] [JSN] |
R2-1914643 | Draft reply LS on QoE Measurement Collection |
LS out LS is reply to R2-1912061 source LS: S5-195659 LS To: SA5 revised to R2-1916315 |
Ericsson | TEI16 |
R2-108 AI: 7.5 |
revised | [WTS] [JSN] | ||
R2-1914644 | UE capabilities for SRVCC from 5G to 3G | discussion | Ericsson | SRVCC_NR_to_UMTS-Core |
R2-108 AI: 6.14.2 |
available | [WTS] [JSN] | ||
R2-1914645 | Introduction of SRVCC from 5G to 3G |
CR revised to R2-1916335 |
Ericsson | 37.34 15.7.0 CR#165 catB | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.3 |
revised | [WTS] [JSN] |
R2-1914646 | Running CR for introduction of SRVCC from 5G to 3G |
draftCR revised to R2-2000326 |
Ericsson | SRVCC_NR_to_UMTS-Core | Rel-15 |
R2-108 AI: 6.14.1 |
endorsed | [WTS] [JSN] | |
R2-1914647 | Remaining issues on Paging | discussion | Ericsson | NR_unlic-Core |
R2-108 AI: 6.2.3.1 |
available | [WTS] [JSN] | ||
R2-1914648 | RRM in NR-U | discussion | Ericsson | NR_unlic-Core |
R2-108 AI: 6.2.3.2 |
available | [WTS] [JSN] | ||
R2-1914649 | Correction on T322 |
CR revision of R2-1914091 |
Nokia, Nokia Shanghai Bell | 36.331 14.12.0 CR#41122 catF | NB_IOTenh-Core | Rel-14 |
R2-108 AI: 4.1 |
agreed | [WTS] [JSN] |
R2-1914650 | Correction on T322 |
CR revision of R2-1913192 |
Nokia, Nokia Shanghai Bell | 36.331 15.7.0 CR#41131 catA | NB_IOTenh-Core | Rel-15 |
R2-108 AI: 4.1 |
agreed | [WTS] [JSN] |
R2-1914651 | On combined RRC procedures |
discussion revision of R2-1913110 revised to R2-2001041 |
Nokia, Nokia Shanghai Bell, Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1914652 | RRC processing delays for combined procedures |
CR revision of R2-1913111 revised to R2-2001042 |
Nokia, Nokia Shanghai Bell, Ericsson | 38.331 15.7.0 CR#12881 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1914653 | Remaining issues of SL Prioritization |
discussion revised to R2-1916263 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
revised | [WTS] [JSN] | |
R2-1914654 | Remaining issues of SL LCP |
discussion revision of R2-1913236 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914655 | On SL configured grant |
discussion revision of R2-1913237 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1914656 | Support of simultaneous mode 1 and mode 2 |
discussion revision of R2-1913238 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |
R2-1914657 | RRM Measurements for Mobility in NR-U |
discussion revision of R2-1912649 |
Fraunhofer HHI, Fraunhofer IIS |
R2-108 AI: 6.2.3.2 |
available | [WTS] [JSN] | |||
R2-1914658 | Implicit Indication of LBT Failures in RRM Measurements | discussion | Fraunhofer HHI |
R2-108 AI: 6.2.3.2 |
available | [WTS] [JSN] | |||
R2-1914659 | Multiple Frequency Domain Monitoring Occasions | discussion | Fraunhofer HHI |
R2-108 AI: 6.2.2.7 |
available | [WTS] [JSN] | |||
R2-1914660 | Introduction of a second SMTC per frequency carrier in idle/inactive |
CR revision of R2-1913258 revised to R2-2000302 |
Orange, AT&T, Vodafone, Telecom Italia S.p.A., CMCC, NTT Docomo Inc., Samsung, Ericsson | 38.331 15.7.0 CR#12182 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1914661 | Introduction of a second SMTC for inter-RAT cell reselection |
CR revision of R2-1913269 revised to R2-2000303 |
Orange, AT&T, Vodafone, Telecom Italia S.p.A., CMCC, NTT Docomo Inc., Samsung, Ericsson | 36.331 15.7.0 CR#41141 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1914662 | Correction on frequency indication in SIB1 and SIB2 |
CR revision of R2-1914209 |
Huawei, HiSilicon, Ericsson, MediaTek | 38.331 15.7.0 CR#12962 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1914663 | Correction on parameter description of beamManagementSSB-CSI-RS in 38.306 |
CR revision of R2-1913783 revised to R2-2001187 |
Huawei, HiSilicon | 38.306 15.7.0 CR#1941 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] |
R2-1914664 | Clarification on gap sharing configuration handling at handover and re-establishment | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4141 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.2 |
postponed | [WTS] [JSN] |
R2-1914665 | CR to 38.306 on DRX-based intra-frequency SFTD measurement |
CR revised to R2-1916244 |
Huawei, HiSilicon, Ericsson | 38.306 15.7.0 CR#196 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
revised | [WTS] [JSN] |
R2-1914666 | CR to 38.331 on DRX-based intra-frequency SFTD measurement |
CR revised to R2-1916245 |
Huawei, HiSilicon, Ericsson | 38.331 15.7.0 CR#1353 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
revised | [WTS] [JSN] |
R2-1914667 | CR to 38.331 on CGI information |
CR revision of R2-1913737 |
Huawei, HiSilicon, Ericsson | 38.331 15.7.0 CR#13411 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1914668 | Report of [107bis#50][NR TEI16] Adding CSI-RS information into inter-node msg | discussion | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.3 |
noted | [WTS] [JSN] | |
R2-1914669 | CR to 38.331 on CSI-RS inter-node message |
CR revised to R2-2001379 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1354 catC | TEI16 | Rel-16 |
R2-108 AI: 6.20.3 |
endorsed | [WTS] [JSN] |
R2-1914670 | Reply LS on CSI-RS configuration transfer |
LS out LS is reply to R2-1914332 LS To: RAN3 revised to R2-1916528 |
Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.3 |
revised | [WTS] [JSN] | |
R2-1914671 | Support of releasing UL configuration |
CR revision of R2-1913272 revised to R2-2001383 |
Huawei, HiSilicon, CMCC, China Telecom, MediaTek Inc., Vodafone, Orange, vivo, OPPO, Spreadtrum Communications, China Unicom | 38.331 15.7.0 CR#11682 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1914672 | DRX configuration coordination in (NG)EN-DC |
discussion revision of R2-1913735 |
Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1914673 | On the support of NG-based (i.e. via CN) handover based using CGI report |
discussion revised to R2-2001188 |
Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1914674 | MAC CE signaling enhancement for TCI indication of single-PDCCH based multi-TRP transmission | discussion | Huawei, HiSilicon | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
available | [WTS] [JSN] | |
R2-1914675 | RRC signalling for MIMO enhancements | discussion | Huawei, HiSilicon | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.2 |
reserved | [WTS] [JSN] | |
R2-1914676 | MAC CE signaling for multi-beam enhancement | discussion | Huawei, HiSilicon | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
available | [WTS] [JSN] | |
R2-1914677 | NR-DC power control | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.2 |
noted | [WTS] [JSN] | |
R2-1914678 | Idle/inactive NR measurements in LTE and in NR | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914679 | MAC impact to support the efficient and low latency SCell configuration and activation | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1914680 | CG fast recovery via alternative UL | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.5 |
available | [WTS] [JSN] | |
R2-1914681 | Remaining issues on fast MCG link recovery | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.5 |
noted | [WTS] [JSN] | |
R2-1914682 | RAN2 impact to support cross-carrier scheduling with different numerologies | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.6 |
noted | [WTS] [JSN] | |
R2-1914683 | Clarification on RAN2 impact to support DL HARQ timing for dual UL EN-DC | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.7 |
available | [WTS] [JSN] | |
R2-1914684 | UE capabilities for DC and CA enhancements | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.7 |
available | [WTS] [JSN] | |
R2-1914685 | Correction on PUCCH transform precoding | CR | vivo, Nokia (rapporteur) | 38.3 15.7.0 CR#178 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.1 |
agreed | [WTS] [JSN] |
R2-1914686 | Cell re-selection during RRC connection resume |
CR revision of R2-1912327 revised to R2-2000359 |
vivo | 38.331 15.7.0 CR#1355 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.6 |
not treated | [WTS] [JSN] |
R2-1914687 | Correction on beamSwitchTiming values of 224 and 336 |
CR revised to R2-2000360 |
vivo, Huawei, Hisilicon | 38.306 15.7.0 CR#214 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.3 |
endorsed | [WTS] [JSN] |
R2-1914688 | Introduction of NR IDC solution |
CR revision of R2-1912329 |
vivo | 38.331 15.7.0 CR#1356 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1914689 | 38.304 Running CR on UE Power saving in NR | CR | vivo | 38.304 15.5.0 CR#142 catB | FS_NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.6 |
not treated | [WTS] [JSN] |
R2-1914690 | Left issues and RRC parameters for PDCCH-WUS | discussion | vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1914691 | WUS impact upon BWP switching |
discussion revision of R2-1912331 |
vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.2 |
withdrawn | [WTS] [JSN] | |
R2-1914692 | UE assistance information for power saving | discussion | vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1914693 | Network controlled RRM measurement relaxation and criteria | discussion | vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1914694 | UE Power Consumption Reduction in RRM Measurement |
discussion revised to R2-2000370 |
vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1914695 | Running 36.321 CR for LTE feMob | CR | vivo (rapporteur) | 36.321 15.7.0 CR#1460 catB | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.2 |
endorsed | [WTS] [JSN] |
R2-1914696 | Running 38.321 CR for NR mobility enh. | CR | vivo (rapporteur) | 38.321 15.7.0 CR#673 catB | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.2 |
endorsed | [WTS] [JSN] |
R2-1914697 | RRC remaining issues for conditional handover configuration |
discussion revision of R2-1912339 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1914698 | Discussion on CHO release |
discussion revision of R2-1912340 revised to R2-2000375 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1914699 | Discussion on the number of prepared cells for CHO |
discussion revision of R2-1912342 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1914700 | Discussion on the timer design for CHO | discussion | vivo | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | |
R2-1914701 | Discussion on simultaneous connectivity in CHO |
discussion revision of R2-1913145 revised to R2-2000377 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1914702 | Discussion on the DC configuration in conditional handover | discussion | vivo | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1914703 | Remaining issue of conditional PSCell addition and change |
discussion revision of R2-1912343 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1914704 | Failure handling of the non-DAPS DRB |
discussion revised to R2-2000380 |
vivo | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1914705 | Remaining PDCP issues of DAPS handover | discussion | vivo | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1914706 | SRB handling of DAPS failure | discussion | vivo | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1914707 | Clarification on the RLC handling of DAPS handover | discussion | vivo | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | |
R2-1914708 | Discussion on the signaling procedures of the DAPS HO |
discussion revision of R2-1912350 |
vivo | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1914709 | Discussion on the mTRP modelling | discussion | vivo | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.2 |
available | [WTS] [JSN] | |
R2-1914710 | Email discussion summy on eMIMO MAC CE | discussion | vivo (rapporteur) | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
noted | [WTS] [JSN] | |
R2-1914711 | Discussion on eMIMO MAC CE |
discussion revised to R2-1916259 |
vivo | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
revised | [WTS] [JSN] | |
R2-1914712 | Remaining issue of SCell BFR | discussion | vivo | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1914713 | New MAC CE for indicating spatial resource for PUCCH resources | CR | Ericsson | 38.321 15.7.0 CR#674 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1914714 | Miscellaneous corrections | CR | Lenovo, Motorola Mobility (Rapporteur) | 36.306 15.6.0 CR#1719 catF | TEI15, LTE_1024QAM_DL-Core, NR_newRAT-Core | Rel-15 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1914715 | Miscellaneous corrections |
CR revised to R2-1916310 |
Lenovo, Motorola Mobility | 36.331 15.7.0 CR#4142 catF | LTE_sTTIandPT-Core, TEI15, NR_newRAT-Core, LTE_QMC_Streaming-Core | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1914716 | Running RRC CR for Introduction of NR eMIMO |
draftCR revised to R2-1916339 |
Ericsson | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.2 |
revised | [WTS] [JSN] | |
R2-1914717 | Issue of D-PUR reconfiguration and release for CP solution |
discussion revised to R2-2001198 |
ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1914718 | PUCCH MAC CE and SRS MAC CE | discussion | Ericsson | Rel-16 |
R2-108 AI: 6.16.3 |
available | [WTS] [JSN] | ||
R2-1914719 | CHO for NTN LEO |
pCR revised to R2-1916390 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
revised | [WTS] [JSN] |
R2-1914720 | Remaining issues for D-PUR in IDLE | discussion | ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1914721 | Input to TR38.821 on NGSO constellation greater than 600 km |
pCR revision of R2-1912405 |
HUGHES Network Systems Ltd | 38.821 0.9.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.2 |
agreed | [WTS] [JSN] |
R2-1914722 | Remaining issues of supporting short eDRX for eMTC connection to 5GC | discussion | ZTE Corporation, Sanechips | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.12 |
noted | [WTS] [JSN] | |
R2-1914723 | Consideration on UE ID of PO calculation for NB-IoT connection to 5GC | discussion | ZTE Corporation, Sanechips | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2. |
noted | [WTS] [JSN] | |
R2-1914724 | Reduced User Data Interruption for NTN |
pCR revision of R2-1912595 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] |
R2-1914725 | Remaining issues for accurate reference timing delivery in TSC |
discussion revised to R2-2001212 |
ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.1 |
available | [WTS] [JSN] | |
R2-1914726 | Stop monitoring the paging in NR-U | discussion | PANASONIC R&D Center Germany |
R2-108 AI: 6.2.3.1 |
available | [WTS] [JSN] | |||
R2-1914727 | Running stage 2 CR on positioning ( [107bis#78][NR Pos] ) |
draftCR revised to R2-1916472 |
Intel Corporation, ESA | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.1 |
revised | [WTS] [JSN] | |
R2-1914728 | LPP CR Capturing RAN1 parameters for positioning ([107bis#80][NR Pos]) |
draftCR revised to R2-2000474 |
Intel Corporation | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |
R2-1914729 | Support of NR dependent positioning methods | discussion | Intel Corporation | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
noted | [WTS] [JSN] | |
R2-1914730 | Assistance data for UE based DL only positioning |
discussion revision of R2-1912705 |
Intel Corporation | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.4 |
available | [WTS] [JSN] | |
R2-1914731 | UE capability on positioning | discussion | Intel Corporation | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.1 |
noted | [WTS] [JSN] | |
R2-1914732 | Access Control for SNPN and CAG | discussion | Intel Corporation | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1914733 | Parent Selection at IAB nodes during Initial Setup | discussion | Intel Corporation | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |
R2-1914734 | Multi-route support in IAB | discussion | Intel Corporation | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |
R2-1914735 | Flow control in IAB - remaining issues | discussion | Intel Corporation | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | |
R2-1914736 | Uplink latency reduction | discussion | Intel Corporation | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | |
R2-1914737 | Further discussion on Backhaul RLF handling | discussion | Intel Corporation | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |
R2-1914738 | Handling of Fairness in IAB | discussion | Intel Corporation | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
noted | [WTS] [JSN] | |
R2-1914739 | Conditional Handover for Non-Terrestrial Networks | discussion | Intel Corporation | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1914740 | Support of multiple SPS and CG configurations | discussion | Intel Corporation | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
noted | [WTS] [JSN] | |
R2-1914741 | Details for Ethernet header compression solution | discussion | Intel Corporation | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.3 |
noted | [WTS] [JSN] | |
R2-1914742 | PDCP duplication with multiple RLC entities | discussion | Intel Corporation | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1914743 | UE based PDCP duplication activation/deactivation |
discussion revision of R2-1912720 |
Intel Corporation | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.2 |
available | [WTS] [JSN] | |
R2-1914744 | Security requirement for UE capability enquiry for NR |
CR revision of R2-1911650 |
Intel Corporation, NTT DoCoMo, Ericsson, Apple | 38.331 15.7.0 CR#11472 catC | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.8 |
agreed | [WTS] [JSN] |
R2-1914745 | Security requirement for UE capability enquiry for LTE |
CR revision of R2-1911651 revised to R2-2001096 |
Intel Corporation, NTT DoCoMo, Ericsson, Apple | 36.331 15.7.0 CR#40412 catC | TEI15, LTE-L23 | Rel-15 |
R2-108 AI: 4.5.1 |
postponed | [WTS] [JSN] |
R2-1914746 | Restoring RoHC/SDAP during Resume |
CR revised to R2-1916485 |
Intel | 38.331 15.7.0 CR#1357 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.6 |
revised | [WTS] [JSN] |
R2-1914747 | Parent Selection at UEs during Initial Setup | discussion | Intel Corporation | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |
R2-1914748 | Remaining issues for reference time delivery | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.2.1 |
noted | [WTS] [JSN] | ||
R2-1914749 | On downlink delay compensation | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.2.1 |
noted | [WTS] [JSN] | ||
R2-1914750 | On support of non-integer multiple of CG/SPS periodicities | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | ||
R2-1914751 | SPS and CG remaining config aspects | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | ||
R2-1914752 | SPS and CG remaining MAC aspects | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | ||
R2-1914753 | Reliability aspects in LCP restriction enhancement | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | ||
R2-1914754 | Miscellaneous issues with L2 impacts | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.3 |
available | [WTS] [JSN] | ||
R2-1914755 | Ethernet header compression | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.2.3 |
noted | [WTS] [JSN] | ||
R2-1914756 | On EHC feedback | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | ||
R2-1914757 | Handling of de-prioritized MAC PDUs | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.3.1 |
noted | [WTS] [JSN] | ||
R2-1914758 | Main functions of intra-UE data-data prioritization | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | ||
R2-1914759 | Intra-UE control-data – SR over PUSCH | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.3.3 |
available | [WTS] [JSN] | ||
R2-1914760 | Configuration and RRC aspects of PDCP Duplication | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.4.1 |
noted | [WTS] [JSN] | ||
R2-1914761 | Open issues related to MAC CE for PDCP duplication | discussion | Ericsson | NR_IIOT-Core |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | ||
R2-1914762 | RRC running CR for NR IIoT | draftCR | Ericsson | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.1 |
endorsed | [WTS] [JSN] | |
R2-1914763 | Report of email discussion [107bis#67] [NR - NTN] |
pCR revised to R2-1916391 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.3 |
revised | [WTS] [JSN] |
R2-1914764 | CR of TS 36.355 for introducing NavIC in LTE |
CR revision of R2-1914071 revised to R2-1916293 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | 36.355 15.5.0 CR#2472 catB | LCS_NAVIC | Rel-16 |
R2-108 AI: 7.7 |
revised | [WTS] [JSN] |
R2-1914765 | CR of TS 36.331 for introducing NavIC in LTE |
CR revision of R2-1913939 revised to R2-1916294 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | 36.331 15.7.0 CR#41371 catB | LCS_NAVIC | Rel-16 |
R2-108 AI: 7.7 |
revised | [WTS] [JSN] |
R2-1914766 | CR of TS 36.305 for introducing NavIC in LTE |
CR revision of R2-1913937 revised to R2-1916408 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | 36.305 15.4.0 CR#841 catB | LCS_NAVIC | Rel-16 |
R2-108 AI: 7.7 |
revised | [WTS] [JSN] |
R2-1914767 | Support for Indian Navigation Satellite System (NavIC) |
discussion revision of R2-1912306 |
Reliance Jio | Rel-16 |
R2-108 AI: 7.7 |
available | [WTS] [JSN] | ||
R2-1914768 | Enhancements for low-latency IAB Uplink scheduling |
discussion revision of R2-1913539 revised to R2-2001342 |
Futurewei Technologies |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | |||
R2-1914769 | NR-U specific aspects for 2-step RACH | discussion | Qualcomm Incorporated, ZTE |
R2-108 AI: 6.2.2.3 |
noted | [WTS] [JSN] | |||
R2-1914770 | Increased peak data rate for HD-FDD MTC UEs | discussion | Qualcomm Incorporated, Orange, Sierra Wireless, Verizon, Ericsson, Sequans, Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
noted | [WTS] [JSN] | |
R2-1914771 | [DRAFT] Rely LS on support of high peak data rate for Cat-M1 UEs in HD-FDD |
LS out LS is reply to R1-1911398 LS To: RAN1 revised to R2-1916314 |
Qualcomm Incorporated | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
revised | [WTS] [JSN] | |
R2-1914772 | DRX Active Time for NR-U | discussion | Qualcomm Incorporated |
R2-108 AI: 6.2.2.4 |
noted | [WTS] [JSN] | |||
R2-1914773 | MAC Scheduling Aspects of Multi-TTI Grant | discussion | Qualcomm Incorporated |
R2-108 AI: 6.2.2.7 |
noted | [WTS] [JSN] | |||
R2-1914774 | UE impact of second SMTC periodicity | discussion | Qualcomm Incorporated |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |||
R2-1914775 | Remaining issues of reference time delivery | discussion | Huawei, HiSilicon,China Southern Power Grid Co., Ltd | NR_IIOT-Core |
R2-108 AI: 6.7.2.1 |
available | [WTS] [JSN] | ||
R2-1914776 | Prioritization issues for MAC CEs and PUSCH | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.3.3 |
available | [WTS] [JSN] | ||
R2-1914777 | Remaining issues for EHC | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | ||
R2-1914778 | Support non-compressed packets transmission without context establishment in EHC | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | ||
R2-1914779 | Solutions to mitigate the periodicity misalignment between TSC traffic and CG/SPS | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | ||
R2-1914780 | Remaining issues for CG/SPS configurations | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | ||
R2-1914781 | New Confirmation MAC CE for multiple CG configurations | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | ||
R2-1914782 | Discussion on mapping between LCH and CG configurations | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | ||
R2-1914783 | UE autonomous transmission in a CG resource for deprioritized data | discussion | Huawei, HiSilicon, SIA | NR_IIOT-Core |
R2-108 AI: 6.7.3.1 |
withdrawn | [WTS] [JSN] | ||
R2-1914784 | Network controlled activation/deactivation of PDCP duplication | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | ||
R2-1914785 | Cell restriction for PDCP duplication with up to 4 legs | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | ||
R2-1914786 | Discussion on multiplexing of data | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-108 AI: 6.2.2.6 |
available | [WTS] [JSN] | ||
R2-1914787 | Discussion on DL LBT failure impact on RLF triggering | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-108 AI: 6.2.3.3 |
available | [WTS] [JSN] | ||
R2-1914788 | Updates to reestablishment procedure |
CR revision of R2-1912723 revised to R2-2001015 |
ZTE Corporation, Sanechips, Intel Corporation, CATT | 38.331 15.7.0 CR#11433 catC | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1914789 | Idle Mode cell reselection based on CN type supported |
discussion revision of R2-1912851 revised to R2-2002609 |
Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2. |
noted | [WTS] [JSN] | |
R2-1914790 | LBT aspects of 2-step RACH MSGA | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.2.2.3 |
available | [WTS] [JSN] | |||
R2-1914791 | LBT failure report on SCell | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |||
R2-1914792 | Multiple Msg1 transmission opportunities | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | |||
R2-1914793 | RAR MAC PDU design for NR-U | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | |||
R2-1914794 | Multiple configured grants | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.2.2.5 |
available | [WTS] [JSN] | |||
R2-1914795 | Remaining issues of paging for NR-U | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.2.3.1 |
available | [WTS] [JSN] | |||
R2-1914796 | Remaining open issues for 2-step CBRA | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |||
R2-1914797 | Consideration on the MsgB RA-RNTI calculation | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |||
R2-1914798 | Running MAC CR for 2-step RACH | draftCR | ZTE Corporation (email rapporteur) | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
endorsed | [WTS] [JSN] | |
R2-1914799 | Summary of running MAC CR review issue list | report | ZTE Corporation (email rapporteur) |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |||
R2-1914800 | Support of CFRA with 2-step RACH | discussion | ZTE Corporation, Sanechips, Vivo, Oppo, Fujitsu, Qualcomm, InterDigital, Intel |
R2-108 AI: 6.13.4 |
noted | [WTS] [JSN] | |||
R2-1914801 | UAC information change indication in 5GC |
discussion revision of R2-1912853 revised to R2-2000539 |
Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2. |
available | [WTS] [JSN] | |
R2-1914802 | UE identity for CIoT/5GC UP Optimization and RRC indication to upper layers |
discussion revision of R2-1912854 |
Qualcomm India Pvt Ltd | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.12 |
available | [WTS] [JSN] | |
R2-1914803 | PTW support for RRC_INACTIVE state with short eDRX |
discussion revision of R2-1912850 |
Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.12 |
noted | [WTS] [JSN] | |
R2-1914804 | UE capability co-ordination signalling aspects for DAPS HO |
discussion revised to R2-2000537 |
Qualcomm India Pvt Ltd, Google Inc, Apple Inc, Charter Communications, MediaTek | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1914805 | Mobility Robustness enhancement for combined CHO and DAPS HO |
discussion revision of R2-1913677 |
Qualcomm Incorporated | LTE_feMob-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1914806 | IAB workplan update |
Work Plan revision of R2-1912797 revised to R2-2000480 |
Qualcomm Incorporated (Rapporteur) | NR_IAB, NR_IAB-Core, NR_IAB-Perf | Rel-16 |
R2-108 AI: 6.1.1 |
noted | [WTS] [JSN] | |
R2-1914807 | LTE DAPS handover UE RF chain requirements | discussion | Qualcomm India Pvt Ltd, Google Inc, Apple Inc, Charter Communications, Intel Corporation | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1914808 | IAB BAP upstream routing | discussion | Qualcomm Incorporated | Rel-16 |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | ||
R2-1914809 | TP to running NR_IAB CR to 38340 on BAP functional view | pCR | Qualcomm Incorporated | 38.34 0.1.0 | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3 |
available | [WTS] [JSN] |
R2-1914810 | Clarification on security key change and bearer termination point change |
CR revision of R2-1913976 revised to R2-1916633 |
ZTE Corporation, Ericsson, Intel | 37.34 15.7.0 CR#1631 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1914811 | Clarification of NR-DC synchronization |
CR revision of R2-1913482 revised to R2-1916634 |
ZTE Corporation | 37.34 15.7.0 CR#1601 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1914812 | Further issues on CHO configuration and execution | discussion | ZTE Corporation, Sanechips | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1914813 | Discussion on CHO execution condition | discussion | ZTE Corporation, Sanechips | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1914814 | Discussion on fast RLF recovery when applying CHO and fast MCG recovery | discussion | ZTE Corporation, Sanechips | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | |
R2-1914815 | Discussion on combination of DAPS and CHO | discussion | ZTE Corporation, Sanechips | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1914816 | Discussion on conditional PSCell addition and change | discussion | ZTE Corporation, Sanechips | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1914817 | Discussion on release of source cell in DAPS HO | discussion | ZTE Corporation, Sanechips | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1914818 | Remaing aspects of control plane handling in DAPS HO | discussion | ZTE Corporation, Sanechips | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1914819 | Remaining issues on UE capability coordination | discussion | ZTE Corporation, Sanechips | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1914820 | Remaining Issues on Early Measurements | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914821 | Inter-RAT Operation | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914822 | Scell dormancy behaviour | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1914823 | On SCG suspension | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1914824 | Maintaining SCG Configuration in Resume procedure | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1914825 | Further issues on MCG fast recovery | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.5 |
available | [WTS] [JSN] | |
R2-1914826 | Configuration for MCG fast recovery | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.5 |
available | [WTS] [JSN] | |
R2-1914827 | IAB BAP layer control messages | discussion | Qualcomm Incorporated | Rel-16 |
R2-108 AI: 6.1.3.4 |
available | [WTS] [JSN] | ||
R2-1914828 | IAB scheduling support | discussion | Qualcomm Incorporated | Rel-16 |
R2-108 AI: 6.1.4.1 |
noted | [WTS] [JSN] | ||
R2-1914829 | [DRAFT] LS on IAB scheduling support |
LS out LS To: RAN3 |
Qualcomm Incorporated | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | |
R2-1914830 | IAB load reporting to IAB-donor CU-CP | discussion | Qualcomm Incorporated | Rel-16 |
R2-108 AI: 6.1.2 |
noted | [WTS] [JSN] | ||
R2-1914831 | IAB flow control feedback info |
discussion revised to R2-1916492 |
Qualcomm Incorporated | Rel-16 |
R2-108 AI: 6.1.3.3 |
revised | [WTS] [JSN] | ||
R2-1914832 | [107bis#53][NR LTE MobE] UE capability structure DAPS/RUDI HO (Intel)- | discussion | Intel Corporation | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
noted | [WTS] [JSN] | |
R2-1914833 | RRC running CR for NR mobility on DAPS HO ( [107bis#54]) | draftCR | Intel Corporation | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.1 |
endorsed | [WTS] [JSN] | |
R2-1914834 | RRC running CR for NR mobility on CHO ( [107bis#54]) | draftCR | Intel Corporation | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.1 |
endorsed | [WTS] [JSN] | |
R2-1914835 | Summary of open issues on RRC running CR-DAPS ( [107bis#54]) | discussion | Intel Corporation | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.1 |
noted | [WTS] [JSN] | |
R2-1914836 | Control plane consideration for dual active protocol stack (DAPS) based RUDI HO |
discussion revision of R2-1912776 |
Intel Corporation, Qualcomm Inc, Charter Communications, Mediatek Inc, Apple | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
noted | [WTS] [JSN] | |
R2-1914837 | Handling of CHO configuration and requirement (compliance check) | discussion | Intel Corporation | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
noted | [WTS] [JSN] | |
R2-1914838 | SDAP and PDCP handling for DAPS HO | discussion | Intel Corporation | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1914839 | Handling of measurement configuration for execution condition | discussion | Intel Corporation | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
noted | [WTS] [JSN] | |
R2-1914840 | DAPS failure handling | discussion | Intel Corporation | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1914841 | UE Feature list for Rel-16 Mobility Enhancement | discussion | Intel Corporation | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.1 |
noted | [WTS] [JSN] | |
R2-1914842 | Other User Plane Stage-3 issues on 2-Step RACH | discussion | Intel Corporation | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1914843 | Remaining issues on PUSCH resource unit selection for 2-step RACH | discussion | Intel Corporation | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1914844 | LBT impact on MsgA | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.3 |
available | [WTS] [JSN] | |
R2-1914845 | PDCCH-WUS operation with CDRX | discussion | Intel Corporation | NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1914846 | UE assistance for C-DRX, SCell and moving UE out of RRC_CONNECTED | discussion | Intel Corporation | NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1914847 | Relaxation of RRM measurements | discussion | Intel Corporation | NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1914848 | Left issues on NR SL MAC design | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1914849 | Considerations on SL RLM/RLF procedure | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1914850 | On HARQ feedback support for NR SL | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914851 | Remaining issues on sidelink configured grant design | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1914852 | SL UE capability aspects | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1914853 | Cross-RAT scheduling for NR V2X SL |
discussion revised to R2-2000458 |
Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.7 |
available | [WTS] [JSN] | |
R2-1914854 | Discussion of the Working assumption on Measurement configuration during INACTIVE | discussion | Intel Corporation | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914855 | Summary of open issues on RRC running CR-CHO ( [107bis#54]) | discussion | Intel Corporation | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.1 |
noted | [WTS] [JSN] | |
R2-1914856 | Remaning issues on the support of 5GCN connectivity | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.12 |
available | [WTS] [JSN] | |
R2-1914857 | Use of extended DRX in RRC inactive state | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.12 |
available | [WTS] [JSN] | |
R2-1914858 | Additional issues in D-PUR in RRC_IDLE | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1914859 | Non-BL UE operation in standalone deployment |
discussion revision of R2-1912863 |
Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.9 |
available | [WTS] [JSN] | |
R2-1914860 | Introduction of Rel-16 eMTC enhancements |
CR revision of R2-1912864 revised to R2-1916361 |
Intel Corporation | 36.3 15.7.0 CR#12512 catB | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
revised | [WTS] [JSN] |
R2-1914861 | Non-BL UE in normal and enhanced coverage |
discussion revision of R2-1912867 |
Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.8 |
available | [WTS] [JSN] | |
R2-1914862 | UE capability for 2-step RACH | discussion | Intel Corporation | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1914863 | Open issues on Configuration of MCG failure indication and timer T316 | discussion | Intel Corporation | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.5 |
available | [WTS] [JSN] | |
R2-1914864 | Draft LS on Uplink LBT failure indication |
LS out LS To: RAN1 revised to R2-1916371 |
Qualcomm Incorporated | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
revised | [WTS] [JSN] | |
R2-1914865 | Considerations for Geographical Zone Design for NR V2X |
discussion revision of R2-1912868 |
InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.4 |
available | [WTS] [JSN] | |
R2-1914866 | RAN2 Aspects of HARQ for NR V2X | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914867 | Need for LCP Restriction on MCR | discussion | InterDigital, Apple, OPPO, Ericsson, Mediatek, CATT, Convida Wireless, Spreadtrum, Fraunhaufer HHI, Fraunhaufer IIS | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1914868 | Remaining Aspects of UL/SL Prioritization | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1914869 | Multiple SL Configured Grants and UE Assistance |
discussion revision of R2-1912872 |
InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1914870 | RAN2 Aspects of CSI Reporting | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1914871 | RLM/RLF for NR V2X | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1914872 | RAN2 Aspects of Simultaneous Configuration of Mode 1 and Mode 2 |
discussion revision of R2-1912875 |
InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |
R2-1914873 | Implementing Starvation Avoidance for NR V2X | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1914874 | Handling the SCG Configuration in RRC Resume | discussion | InterDigital, Ericsson, LG, OPPO, KT Corp | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1914875 | Control Plane Aspects of DAPS HO | discussion | InterDigital | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1914876 | On Combining RUDI and CHO |
discussion revision of R2-1912881 |
InterDigital | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1914877 | Conditional PSCell addition/change | discussion | InterDigital | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1914878 | Intra-UE Prioritization for Overlapping PUSCHs | discussion | InterDigital | FS_NR_IIOT | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |
R2-1914879 | L2 aspects of priority level indication | discussion | InterDigital | FS_NR_IIOT | Rel-16 |
R2-108 AI: 6.7.3.2 |
noted | [WTS] [JSN] | |
R2-1914880 | Intra UE Prioritization between SR and PUSCH |
discussion revision of R2-1912885 |
InterDigital | FS_NR_IIOT | Rel-16 |
R2-108 AI: 6.7.3.3 |
available | [WTS] [JSN] | |
R2-1914881 | Paging Procedure in NR-U | discussion | InterDigital | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.1 |
noted | [WTS] [JSN] | |
R2-1914882 | Handling UL LBT Failures | discussion | InterDigital | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |
R2-1914883 | RLM and RLF for NR-U |
discussion revision of R2-1912892 |
InterDigital | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.3 |
available | [WTS] [JSN] | |
R2-1914884 | PDCP security issue about duplicate detection |
discussion revised to R2-2000723 |
Samsung, LG Electronics Inc., Nokia, Nokia Shanghai Bell, LG Uplus | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1914885 | Down-scoping of DAPS HO scenarios for NR | discussion | Qualcomm Incorporated |
R2-108 AI: 6.9.2 |
noted | [WTS] [JSN] | |||
R2-1914886 | On Maximum Number of CHO Candidate Cells and Nodes | discussion | Charter Communications, Inc | NR_Mob_enh, LTE_feMob, NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
withdrawn | [WTS] [JSN] | |
R2-1914887 | CR on PDCP security issue |
CR revision of R2-1912523 revised to R2-2000724 |
Samsung, LG Electronics Inc., Nokia, Nokia Shanghai Bell, LG Uplus | 38.323 15.6.0 CR#322 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1914888 | Compliance Check for CHO Target Cell Configurations | discussion | MediaTek Inc. |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |||
R2-1914889 | Measurement Report for Conditional Handover Procedures |
discussion revision of R2-1913001 |
MediaTek Inc. |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |||
R2-1914890 | Report of Email Discussion 107bis#68 Power Saving RRM Measurement Relaxation | report | MediaTek Inc. |
R2-108 AI: 6.11.6 |
noted | [WTS] [JSN] | |||
R2-1914891 | NR Paging Frame Calculation when SearchSpaceId is Zero |
discussion revision of R2-1913928 |
MediaTek Inc. |
R2-108 AI: 5.4.5.2 |
noted | [WTS] [JSN] | |||
R2-1914892 | CN Type Indication for Cell Reselection from NR to LTE |
discussion revision of R2-1913003 |
MediaTek Inc. |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |||
R2-1914893 | Discussion on RRC reestablishment initiated by failure of MCG failure recovery |
discussion revised to R2-2000541 |
SHARP | LTE_NR_DC_CA_enh-Core |
R2-108 AI: 6.10.5 |
available | [WTS] [JSN] | ||
R2-1914894 | Allow Delta Configuration of ParametersListFmt2 and ParametersListEDTFmt2 in SIB2-NB |
CR revised to R2-1916423 |
MediaTek Inc., ZTE Corporation, Sanechips, Huawei, HiSilicon | 36.331 15.7.0 CR#4143 catF | NB_IOTenh2-Core | Rel-15 |
R2-108 AI: 4.1 |
revised | [WTS] [JSN] |
R2-1914895 | Support of dormancy SCG | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1914896 | Draft LS on support of dormancy SCG |
LS out LS To: RAN3 |
OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1914897 | PDCP Running CR for NR IIOT | draftCR | PDCP Rapporteur (LG Electronics Inc.) | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.1 |
not pursued | [WTS] [JSN] | |
R2-1914898 | PDCP open issues for IIOT | discussion | PDCP Rapporteur (LG Electronics Inc.) | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.1 |
noted | [WTS] [JSN] | |
R2-1914899 | Redundant retransmission in PDCP duplication |
discussion revision of R2-1913759 |
LG Electronics Inc., LG Uplus | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1914900 | MAC CE format for PDCP duplication |
discussion revision of R2-1913761 |
LG Electronics Inc. | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1914901 | Handling of RLC stuck problem with PDCP duplication |
discussion revision of R2-1913805 |
LG Electronics Inc., LG Uplus | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1914902 | Reduced PDCCH monitoring in CA | discussion | LG Electronics Inc. | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1914903 | ON Duration adaptation |
discussion revised to R2-2001285 |
LG Electronics Inc., LG Uplus, Vivo | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1914904 | Conditional presence on ue-CapabilityInfo and servCellIndexRangeSCG for inter-MN handover without SN change |
CR revision of R2-1913234 |
NTT DOCOMO, INC., Ericsson | 38.331 15.7.0 CR#1358 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
agreed | [WTS] [JSN] |
R2-1914905 | Measurement coordination on maxMeasIdentitiesSCG in MR-DC |
discussion revision of R2-1912765 |
ZTE Corporation, Sanechips, Ericsson, NEC, CATT | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.3 |
noted | [WTS] [JSN] | |
R2-1914906 | Corrections on maxMeasIdentitiesSCG in MR-DC |
CR revision of R2-1912766 revised to R2-2000245 |
ZTE Corporation, Sanechips, Ericsson, NEC, CATT | 38.331 15.7.0 CR#12721 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.3 |
not treated | [WTS] [JSN] |
R2-1914907 | CR to introduce timer for DRX based SFTD measurement |
CR revision of R2-1912767 |
ZTE Corporation, Sanechips, MediaTek Inc. | 38.331 15.7.0 CR#12731 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1914908 | Correction on absence of gapPurpose |
CR revision of R2-1912768 |
ZTE Corporation, Sanechips | 38.331 15.7.0 CR#12741 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1914909 | Consideration on DRX coordination in ANR |
discussion revision of R2-1912769 |
ZTE Corporation, Sanechips, NEC | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1914910 | Corrections on DRX coordination in ANR |
CR revision of R2-1912770 |
ZTE Corporation, Sanechips, NEC | 38.331 15.7.0 CR#12751 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1914911 | [107bis#34]Correction on ambiguity of UE FDD&TDD FR1&FR2 capabilities |
CR revised to R2-1916495 |
ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | 38.331 15.7.0 CR#1359 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1914912 | Remaining issues for UTRAN measurement | discussion | ZTE Corporation, Sanechips | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.2 |
available | [WTS] [JSN] | |
R2-1914913 | Discussion on measurement relaxation rule in time domain | discussion | ZTE Corporation, Sanechips | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1914914 | Report of [107#81][NR TEI16] Need-for-Gaps signalling |
discussion revision of R2-1913847 |
MediaTek Inc. | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1914915 | Further discussion on NeedForGap | discussion | MediaTek Inc. Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1914916 | Dual SMTC in IDLE mode | discussion | MediaTek Inc. | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1914917 | Discussion on early measurement configuration upon state transition |
discussion revision of R2-1913835 |
MediaTek Inc. | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
noted | [WTS] [JSN] | |
R2-1914918 | Remaining issues on BH RLF notification |
discussion revised to R2-2000274 |
vivo |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |||
R2-1914919 | [Draft] LS on BH RLF notification verification |
LS out LS To: SA3 revised to R2-2000275 |
vivo |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |||
R2-1914920 | Discussion on IAB BH RLF report mechanism |
discussion revised to R2-2000273 |
vivo |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |||
R2-1914921 | Running CR to 37324 for 5G_V2X_NRSL | draftCR | vivo (Rapporteur) | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1914922 | Left Issues on NR SL RLC and PDCP |
discussion revision of R2-1912253 |
vivo |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
R2-1914923 | Left issues for UL SL prioritization | discussion | vivo |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914924 | Remaining issues on HARQ support for NR Sidelink | discussion | vivo |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914925 | Left LCP issues | discussion | vivo |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914926 | CSI and RSRP reporting | discussion | vivo |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1914927 | Resource pool (re-)selection based on HARQ feedback |
discussion revised to R2-2000282 |
vivo |
R2-108 AI: 6.4.4 |
available | [WTS] [JSN] | |||
R2-1914928 | Discussion on SR and BSR |
discussion revision of R2-1912256 |
vivo |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |||
R2-1914929 | Discussion on Truncated Sidelink BSR |
discussion revision of R2-1912257 |
vivo |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |||
R2-1914930 | Remaining issues on sidelink configured grant |
discussion revision of R2-1912258 |
vivo |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |||
R2-1914931 | Remaining issues on PC5-RRC message exchange | discussion | vivo |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1914932 | Discussion on sideink radio link management without physical layer indications | discussion | vivo |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1914933 | Signaling procedure for QoS and SLRB management | discussion | vivo |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |||
R2-1914934 | Mode switch for QoS guarantee in NR V2X |
discussion revision of R2-1912266 revised to R2-2000281 |
vivo |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |||
R2-1914935 | Signaling content for QoS and SLRB management | discussion | vivo |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |||
R2-1914936 | Running CR to 37.340 for CA_DC enhancements | draftCR | vivo, Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1914937 | Power control for NR DC |
discussion revision of R2-1912269 |
vivo |
R2-108 AI: 6.10.2 |
noted | [WTS] [JSN] | |||
R2-1914938 | Remaining issues for Validity Area | discussion | vivo |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |||
R2-1914939 | Early Measurement Reporting for INACTIVE State |
discussion revision of R2-1912271 |
vivo |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |||
R2-1914940 | UE measurement behaviour regarding autonomous state transition |
discussion revision of R2-1912272 |
vivo |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |||
R2-1914941 | IDC impact for early measurement |
discussion revision of R2-1912273 |
vivo |
R2-108 AI: 6.10.3 |
withdrawn | [WTS] [JSN] | |||
R2-1914942 | Speed Up CA/DC setup during RRC Connection Re-establishment |
discussion revision of R2-1912274 |
vivo |
R2-108 AI: 6.10.4.4 |
available | [WTS] [JSN] | |||
R2-1914943 | Dormancy-like behavior on SCell | discussion | vivo |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |||
R2-1914944 | UE behavior for suspended SCG | discussion | vivo |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |||
R2-1914945 | Remaining issues on MCG fast recovery |
discussion revision of R2-1912277 |
vivo |
R2-108 AI: 6.10.5 |
available | [WTS] [JSN] | |||
R2-1914946 | Remaining issues for Logged MDT | discussion | vivo |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |||
R2-1914947 | UE capability parameters for SON_MDT | discussion | vivo |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |||
R2-1914948 | Running CR to 38.306 for NR_SON_MDT | discussion | vivo | NR_SON_MDT-Core |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | ||
R2-1914949 | Autonomous Gap capability for CGI reporting | discussion | vivo, Ericsson, Huawei, HiSilicon |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |||
R2-1914950 | [Draft] Reply LS on autonomous gap capability |
LS out LS To: RAN4 |
vivo |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |||
R2-1914951 | Discussion on Suspended SCG | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | ||
R2-1914952 | Capability for early measurement reporting | discussion | MediaTek Inc. | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1914953 | Capability for fast DC/CA setup | discussion | MediaTek Inc. | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.4 |
available | [WTS] [JSN] | |
R2-1914954 | UE Capability for NR-U Support | draftCR | vivo | NR_unlic | Rel-16 |
R2-108 AI: 6.2.3.5 |
not treated | [WTS] [JSN] | |
R2-1914955 | Clarification on measurement gap configuration in NR SA |
CR revision of R2-1913978 |
MediaTek Inc., Nokia (Rapporteur), Samsung, ZTE Corporation, Sanechips, Intel | 38.3 15.7.0 CR#1732 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.1 |
agreed | [WTS] [JSN] |
R2-1914956 | Consideration on the Consumers of AMF service on Event Exposure | discussion | BUPT |
R2-108 AI: 6.20.3 |
available | [WTS] [JSN] | |||
R2-1914957 | Enhancement to the Namf_Communication_ AMFStatusChangeNotify service operation | discussion | BUPT |
R2-108 AI: 6.20.3 |
available | [WTS] [JSN] | |||
R2-1914958 | Clarification on the uplink skipping | discussion | vivo |
R2-108 AI: 5.3.1 |
noted | [WTS] [JSN] | |||
R2-1914959 | Propagation delay compensation for reference time |
discussion revision of R2-1912311 |
vivo |
R2-108 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |||
R2-1914960 | Remaining issues for EHC |
discussion revision of R2-1912313 revised to R2-2000494 |
vivo |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |||
R2-1914961 | Discussion on LCID restriction |
discussion revision of R2-1910004 revised to R2-2000499 |
vivo |
R2-108 AI: 6.7.4.3 |
available | [WTS] [JSN] | |||
R2-1914962 | Discussion on the periodicity misalignment between TSC traffic and SPS/CG |
discussion revision of R2-1912316 |
vivo |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |||
R2-1914963 | Reference cell for the dedicated provisioning of timing information | discussion | vivo |
R2-108 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |||
R2-1914964 | URLLC transmission within measurement gap |
discussion revision of R2-1912317 |
vivo |
R2-108 AI: 6.7.3.4 |
available | [WTS] [JSN] | |||
R2-1914965 | SPS and CG configuration issue on the partial overlapping TSN traffic pattern |
discussion revision of R2-1912318 |
vivo |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |||
R2-1914966 | Discussion on the MAC PDU recovery procedure |
discussion revision of R2-1912320 |
vivo |
R2-108 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |||
R2-1914967 | Discussion on the support of DC+CA duplication |
discussion revision of R2-1912321 |
vivo |
R2-108 AI: 6.7.4.1 |
noted | [WTS] [JSN] | |||
R2-1914968 | Remaining issues for SR and PUSCH collision | discussion | vivo |
R2-108 AI: 6.7.3.3 |
available | [WTS] [JSN] | |||
R2-1914969 | Discussion on the UE handling for the equal priority of uplink grants |
discussion revision of R2-1905762 |
vivo |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |||
R2-1914970 | Issue on the Namf_Communication_ AMFStatusChangeSubscribe service operation | discussion | BUPT |
R2-108 AI: 6.20.3 |
available | [WTS] [JSN] | |||
R2-1914971 | Issue on the Namf_Communication_AMFStatusChangeUnSubscribe operation | discussion | BUPT |
R2-108 AI: 6.20.3 |
available | [WTS] [JSN] | |||
R2-1914972 | Clarification on PSCell/SCell SI reception | CR | MediaTek Inc. | 38.331 15.7.0 CR#1360 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.6 |
not pursued | [WTS] [JSN] |
R2-1914973 | location based mobility enhancement | discussion | NEC |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |||
R2-1914974 | Service continuity between TN and NTN |
discussion revised to R2-1916387 |
NEC |
R2-108 AI: 6.6.4.1 |
revised | [WTS] [JSN] | |||
R2-1914975 | IAB backhaul RLF handling | discussion | NEC |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |||
R2-1914976 | Flow control in IAB | discussion | NEC |
R2-108 AI: 6.1.3.3 |
available | [WTS] [JSN] | |||
R2-1914977 | Consideration on E-CID in NR | discussion | Huawei, HiSilicon | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |
R2-1914978 | Discussion on sigalling design for NR DL positioning procedures | discussion | Huawei, HiSilicon | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |
R2-1914979 | Considerations on UL procedures for NR positioning | discussion | Huawei, HiSilicon | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
noted | [WTS] [JSN] | |
R2-1914980 | Further considerations on DL procedures for NR positioning | discussion | Huawei, HiSilicon | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |
R2-1914981 | Discussion on broadcasting of positioning assistance data | discussion | Huawei, HiSilicon | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.3.1 |
noted | [WTS] [JSN] | |
R2-1914982 | Discussion on demand SI in connected mode for positioning | discussion | Huawei, HiSilicon | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.3.2 |
available | [WTS] [JSN] | |
R2-1914983 | Correction on the EUTRAN terminology |
CR revised to R2-1916628 |
Huawei, HiSilicon | 38.305 15.4.0 CR#141 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.3 |
revised | [WTS] [JSN] |
R2-1914984 | CHO execution with multiple candidate cells before HOF |
discussion revision of R2-1912812 |
Futurewei | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | |
R2-1914985 | Remaining issues on procedure and signaling of CPAC |
discussion revision of R2-1912816 |
Futurewei | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1914986 | Handling of multiple candidate cells for CPAC | discussion | Futurewei | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1914987 | Discussion on PDCCH-WUS missing problems during BWP switching and handover |
discussion revised to R2-1916295 |
Xiaomi Communications |
R2-108 AI: 6.11.2 |
revised | [WTS] [JSN] | |||
R2-1914988 | Procedures on how the PDCCH-WUS works with C-DRX | discussion | Xiaomi Communications |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |||
R2-1914989 | Text Proposal for adding the Phase Bias Indicator to the SSR Phase Bias message | draftCR | Swift Navigation, Ericsson | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.2 |
noted | [WTS] [JSN] | |
R2-1914990 | Some remaining issues on the CSI and SRS reporting | discussion | Xiaomi Communications |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |||
R2-1914991 | Timing of Key Derivation in Conditional Handover | discussion | Futurewei | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1914992 | Draft LS on the Timing of AS Key Derivation in Conditional Handover |
LS out LS To: SA2 |
Futurewei | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1914993 | Handling of Key Derivation in Conditional PSCell Addition/Change | discussion | Futurewei | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1914994 | Adaptation of QoS Flow to DRB Mapping for MDBV Enforcement | discussion | Futurewei | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1914995 | Reception of End-Marker upon QoS Flow Remapping | discussion | Futurewei | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1914996 | Proposal for clarification and optimization of n90 UE capability | discussion | KDDI Corporation |
R2-108 AI: 6.20.3 |
noted | [WTS] [JSN] | |||
R2-1914997 | Configuration of PDCP duplication with up to 4 RLC entities | discussion | Sharp |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |||
R2-1914998 | Discussion on sidelink SR trigger |
discussion revision of R2-1913164 revised to R2-2000773 |
Fujitsu | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1914999 | MAC CE structure for PDCP duplication activation/deactivation |
discussion revision of R2-1913166 |
Fujitsu | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1915000 | NW-based per-packet PDCP duplication |
discussion revision of R2-1913167 |
Fujitsu | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1915001 | Considerations on MsgB reception |
discussion revision of R2-1913168 |
Fujitsu | NR_2step_RACH | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1915002 | On open questions to 2-step CF-RACH |
discussion revision of R2-1913169 |
Fujitsu | NR_2step_RACH | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1915003 | SR_COUNTER initialization due to RRC reconfiguration |
discussion revision of R2-1913170 revised to R2-2000779, R2-2001644 |
Fujitsu, LG Electronics Inc. | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915004 | Deactivation of Primary Path | discussion | Sharp |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |||
R2-1915005 | RA Prioritization for MPS for 2-step RACH |
discussion revised to R2-1916269 |
Perspecta Labs, ECD, AT&T, T-Mobile, Sprint, Ericsson, Qualcomm | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
revised | [WTS] [JSN] | |
R2-1915006 | PRACH prioritization parameters for MPS and MCS |
CR revised to R2-2002102 |
Perspecta Labs, ECD, AT&T, FirstNet, T-Mobile, Sprint, Verizon, Qualcomm, Ericsson | 38.331 15.7.0 CR#1361 catB | NR_newRAT-Core, TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1915007 | PRACH prioritization procedure for MPS and MCS |
CR revised to R2-2002103 |
Perspecta Labs, ECD, AT&T, FirstNet, T-Mobile, Sprint, Verizon, Qualcomm, Ericsson | 38.321 15.7.0 CR#675 catB | NR_newRAT-Core, TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1915008 | Discussion on RACH report | discussion | SHARP | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915009 | Further discussion on RLF recovery in CHO | discussion | SHARP | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | |
R2-1915010 | Fast SN Activation in Handover to EN-DC | discussion | Qualcomm Incorporated |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |||
R2-1915011 | Paging monitoring in NR-U | discussion | Qualcomm Incorporated |
R2-108 AI: 6.2.3.1 |
noted | [WTS] [JSN] | |||
R2-1915012 | [Draft] LS on clarification and optimization of n90 UE Capability |
LS out LS To: RAN4 |
KDDI Corporation | NR_n41_LTE_41_coex | Rel-16 |
R2-108 AI: 6.20.3 |
noted | [WTS] [JSN] | |
R2-1915013 | Remaining issues on priority handling in NR V2X | discussion | Spreadtrum Communications |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1915014 | [Draft] LS on priority indicaition in SCI |
LS out LS To: RAN1 |
Spreadtrum Communications | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915015 | LBT Failures Handling in Non-Connected State |
discussion revised to R2-2000563 |
Spreadtrum Communications, Huawei, HiSilicon |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |||
R2-1915016 | Inconsecutive UL LBT Failures Handling | discussion | Spreadtrum Communications |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |||
R2-1915017 | Handling of periodicity misalignment between CG and TSN traffic | discussion | Spreadtrum Communications |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |||
R2-1915018 | Equal priority handling for CG and CG collision | discussion | Spreadtrum Communications |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |||
R2-1915019 | Consideration on selective PDCP duplication |
discussion revised to R2-2000565 |
Spreadtrum Communications |
R2-108 AI: 6.7.4.2 |
available | [WTS] [JSN] | |||
R2-1915020 | Consideration on early measurement reporting | discussion | Spreadtrum Communications |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |||
R2-1915021 | Early measurement in NR-U | discussion | Spreadtrum Communications |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |||
R2-1915022 | Measurement report enhancement in conditional handover |
discussion revision of R2-1912240 |
Spreadtrum Communications |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |||
R2-1915023 | RRC signaling size restriction in CHO |
discussion revision of R2-1912241 |
Spreadtrum Communications |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |||
R2-1915024 | Remaining issues for Conditional PSCell Change | discussion | Spreadtrum Communications |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |||
R2-1915025 | Clarification on NR suitable cell for NR re-establishment | CR | Spreadtrum Communications | 38.3 15.7.0 CR#179 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.1 |
not pursued | [WTS] [JSN] |
R2-1915026 | Enhancements of resuming MR-DC configuration with RRC Resume | discussion | Spreadtrum Communications |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |||
R2-1915027 | Left issues on LCP procedure | discussion | Spreadtrum Communications |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1915028 | Consideration on activation and deactivation of PDCP duplication | discussion | Spreadtrum Communications |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |||
R2-1915029 | Skipping supportedBandCombinationList of n90 |
CR revision of R2-1914205 |
KDDI Corporation | 38.306 15.7.0 CR#1892 catC | NR_n41_LTE_41_coex | Rel-16 |
R2-108 AI: 6.20.3 |
not pursued | [WTS] [JSN] |
R2-1915030 | TB construction during LCP procedure | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1915031 | KgNB derivation upon mobility |
CR revision of R2-1914129 |
Qualcomm Incorporated | 38.3 15.7.0 CR#1741 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1915032 | Summary of email discussion [107bis#46][NR TEI16] Voice fallback | report | Qualcomm Incorporated | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1915033 | Introduction of voice fallback indication |
CR revision of R2-1913389 revised to R2-2000580 |
Qualcomm Incorporated, T-Mobile USA, Verizon, China Telecom, Softbank, Ericsson | 38.331 15.7.0 CR#13121 catC | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1915034 | Introduction of voice fallback indication |
CR revision of R2-1913390 revised to R2-2000581 |
Qualcomm Incorporated, T-Mobile USA, Verizon, China Telecom, Softbank, Ericsson | 36.331 15.7.0 CR#41361 catC | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1915035 | [Draft] LS on RRC establishment cause value in EPS voice fallback from NR to E-UTRAN |
LS out LS To: CT1 revised to R2-1916530 |
Qualcomm Incorporated | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
revised | [WTS] [JSN] | |
R2-1915036 | Discussion on RAN1 agreements related to PUR | discussion | Nokia Solutions & Networks (I) | NB_IOTenh3 | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1915037 | Combination of CHO and RUDI Handover |
discussion revision of R2-1913793 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1915038 | Faster Handover Failure Recovery |
discussion revision of R2-1913794 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.4 |
available | [WTS] [JSN] | |
R2-1915039 | Remaining FFSs on Data Forwarding for DAPS HO and CHO | discussion | ETRI | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1915040 | Bye Message for DAPS Handover |
discussion revision of R2-1913797 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1915041 | Source Cell Release in DAPS Handover |
discussion revision of R2-1913798 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1915042 | Further consideration on access control aspect | discussion | III | Rel-16 |
R2-108 AI: 7.2. |
available | [WTS] [JSN] | ||
R2-1915043 | Mobility state in RLF | discussion | Qualcomm Incorporated | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915044 | RACH Report | discussion | Qualcomm Incorporated | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915045 | RACH Failure information | discussion | Qualcomm Incorporated | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915046 | Management Based Logged MDT Configuration for RRC_INACTIVE | discussion | Qualcomm Incorporated | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915047 | Clarification on PO calculation |
CR revision of R2-1912986 |
Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#12811 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.5.2 |
not pursued | [WTS] [JSN] |
R2-1915048 | Cross-RAT RLF report | discussion | Qualcomm Incorporated | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915049 | Cross-system RLF report |
discussion revised to R2-2000002 |
Qualcomm Incorporated | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | ||
R2-1915050 | Logged MDT Configuration and Reporting for MR-DC | discussion | Qualcomm Incorporated | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915051 | CR on multiple SMTC for idle |
CR revision of R2-1912996 |
Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#12821 catF | TEI16 | Rel-15 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915052 | Fallback procedure for INACTIVE mode |
discussion revision of R2-1912524 |
Samsung | LTE_NR_DC_CA_enh |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | ||
R2-1915053 | UE History Information |
discussion revised to R2-2001399 |
Qualcomm Incorporated | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915054 | UE History Information | discussion | Qualcomm Incorporated | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
reserved | [WTS] [JSN] | |
R2-1915055 | Discussion about Successful HO in MRO | discussion | Qualcomm Incorporated | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915056 | Open issues in DCCA WI | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.1 |
noted | [WTS] [JSN] | |
R2-1915057 | Wideband operation in NR-U | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.7 |
available | [WTS] [JSN] | |
R2-1915058 | Paging in NR-U | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.1 |
noted | [WTS] [JSN] | |
R2-1915059 | early measurements and 2-step resume | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1915060 | Early measurement handling during reselection | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
noted | [WTS] [JSN] | |
R2-1915061 | UE capabilities for early measurements | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1915062 | Fast Scell Activation | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1915063 | Configuration of MCG failure recovery | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.5 |
available | [WTS] [JSN] | |
R2-1915064 | CR on how to introduce x-scheduling with different numerologies | draftCR | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.6 |
noted | [WTS] [JSN] | |
R2-1915065 | Multiple SMTC for Idle | discussion | Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1915066 | Unnecessary deciphering for duplicated PDUs |
discussion revision of R2-1912525 revised to R2-2000725 |
Samsung | TEI16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | ||
R2-1915067 | CR on unnecessary deciphering for duplicated PDU |
CR revision of R2-1912526 |
Samsung | 38.323 15.6.0 CR#342 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1915068 | Trigger Conditions for low-latency IAB Uplink Scheduling |
discussion revision of R2-1913065 |
ITRI | NR_IAB-Core |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | ||
R2-1915069 | RA variables for 2-step RACH fallback procedure | discussion | ITRI | NR_2step_RACH-Core |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | ||
R2-1915070 | Msg1 transmission opportunities |
discussion revision of R2-1913062 |
ITRI | NR_unlic-Core |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | ||
R2-1915071 | T312 mechanism for conditional handover | discussion | ITRI | NR_Mob_enh-Core |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | ||
R2-1915072 | Discussion on the paging opportunities overlapping for the NR-U |
discussion revision of R2-1913061 |
ITRI | NR_unlic-Core |
R2-108 AI: 6.2.3.1 |
available | [WTS] [JSN] | ||
R2-1915073 | Discussion on TAI list provisioning and TAU triggering | discussion | ITRI | FS_NR_NTN_solutions |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | ||
R2-1915074 | Discussion on the information for parent node selection | discussion | ITRI | NR_IAB-Core |
R2-108 AI: 6.1.5.3 |
available | [WTS] [JSN] | ||
R2-1915075 | Feedback for EHC algorithm |
discussion revision of R2-1912527 |
Samsung | NR_IIOT |
R2-108 AI: 6.7.2.3 |
noted | [WTS] [JSN] | ||
R2-1915076 | Configuration limitation for RRCRelease message in R15 | CR | OPPO | 38.331 15.7.0 CR#1362 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1915077 | SDAP control PDU handling in Rel-16 EHC |
discussion revised to R2-2000726 |
Samsung | NR_IIOT |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | ||
R2-1915078 | Left issues on SDAP Rx behaviour on remapping | discussion | OPPO, Ericsson, Apple, Qualcomm Incorporated, Intel Corporation, ITL, InterDigital, MediaTek Inc., Samsung, Beijing Xiaomi Software Tech, Nokia, Nokia Shanghai Bell, ASUSTeK, Spreadtrum Communications, Convida Wireless, LG Electronics Inc., Lenovo, Motoro | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1915079 | UE radio capability ID exchange over X2/Xn and S1/NG interface |
discussion revision of R2-1912672 |
ZTE Corporation, Sanechips | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.2 |
noted | [WTS] [JSN] | |
R2-1915080 | Introduction of UE radio capability ID in inter-node RRC messages |
draftCR revision of R2-1912673 |
ZTE Corporation, Sanechips | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.2 |
available | [WTS] [JSN] | |
R2-1915081 | TP on RACH capacity calculation based on typical cell size |
draftCR revised to R2-1916392 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1915082 | Remaining issues in NTN-TN service continuity |
discussion revision of R2-1912669 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1915083 | Location report to help apply country specific policies |
discussion revision of R2-1912668 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1915084 | Satellite type differentiation |
discussion revised to R2-1916389 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.2 |
revised | [WTS] [JSN] | |
R2-1915085 | Consideration on ephemeris data handling | discussion | ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.3 |
available | [WTS] [JSN] | |
R2-1915086 | Remaining issues in efficient state transition by UE assistance | discussion | ZTE Corporation, Sanechips | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915087 | Remaining issues in C-DRX and Scell related UE assistance information | discussion | ZTE Corporation, Sanechips | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915088 | Remaining issues on SI request procedure in RRC_CONNECTED | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-108 AI: 6.21 |
noted | [WTS] [JSN] | ||
R2-1915089 | Consideration on the PCI Range | discussion | ZTE Corporation, Sanechips | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1915090 | Overview of the Connected State Issues | discussion | ZTE Corporation, Sanechips | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.3 |
available | [WTS] [JSN] | |
R2-1915091 | Consideration on the HRNN and Access control | discussion | ZTE Corporation, Sanechips | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.4 |
available | [WTS] [JSN] | |
R2-1915092 | Scheduling enhancements for TSC network | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | ||
R2-1915093 | Discussion on confirmation MAC CE for TSC network | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | ||
R2-1915094 | Discussion on Ethernet Header Compression | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | ||
R2-1915095 | Consideration on UE autonomous retx for the deprioritized MAC PDU | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | ||
R2-1915096 | Issues on ignoring the received UL grant for deprioritized PDU | discussion | OPPO,Sony,Huawei, HiSilicon, ZTE Corporation, Sanechips | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | ||
R2-1915097 | Intra-UE prioritization involving configured grant | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | ||
R2-1915098 | Discussion on SR cancelling on intra-UE prioritization involving SR | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.3.3 |
available | [WTS] [JSN] | ||
R2-1915099 | Intra-UE prioritization between multiple SRs | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.3.4 |
available | [WTS] [JSN] | ||
R2-1915100 | Discussion on data duplication enhancement in IIoT | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | ||
R2-1915101 | Discussion on UE-based data duplication enhancement | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.4.2 |
available | [WTS] [JSN] | ||
R2-1915102 | Cell restriction for PDCP duplication in IIoT | discussion | OPPO | Rel-16 |
R2-108 AI: 6.7.4.3 |
available | [WTS] [JSN] | ||
R2-1915103 | LBT impact to Multi-PUSCH scheduling |
discussion revision of R2-1912662 |
Lenovo, Motorola Mobility | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.7 |
noted | [WTS] [JSN] | |
R2-1915104 | Multiple active Configured Grants | discussion | Lenovo, Motorola Mobility | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.5 |
available | [WTS] [JSN] | |
R2-1915105 | UE behavior upon consistent LBT failure | discussion | Lenovo, Motorola Mobility | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |
R2-1915106 | SL HARQ protocol operation |
discussion revision of R2-1912686 |
Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915107 | SR trigger for NR SL |
discussion revision of R2-1912687 |
Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1915108 | SL LCP procedure considering the MCR requirements | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915109 | Details of SCell Beam Failure Recovery Procedure | discussion | Lenovo, Motorola Mobility | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1915110 | Discussion on BAP configuration | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.5.2 |
available | [WTS] [JSN] | |||
R2-1915111 | Further consideration on bearer mapping | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.3.2 |
available | [WTS] [JSN] | |||
R2-1915112 | Consideration on routing in IAB | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |||
R2-1915113 | Discussion on re-routing in IAB network | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.3.1 |
noted | [WTS] [JSN] | |||
R2-1915114 | Further consideration on flow control in IAB | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | |||
R2-1915115 | Discussion on BAP control PDU | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |||
R2-1915116 | Discussion on low latency scheduling in IAB | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | |||
R2-1915117 | Discussion on case-1 OTA timing alignment | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.4.3 |
noted | [WTS] [JSN] | |||
R2-1915118 | Consideration on the Extended LCID in IAB | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.4.2 |
available | [WTS] [JSN] | |||
R2-1915119 | Discussion on IAB BH RLF handling | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |||
R2-1915120 | Discussion on BH RLC channel configuration in IAB network | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.5.2 |
available | [WTS] [JSN] | |||
R2-1915121 | Discussion on IAB node connection setup | discussion | ZTE, Sanechips |
R2-108 AI: 6.1.5.3 |
available | [WTS] [JSN] | |||
R2-1915122 | PDCP version in EN-DC |
CR revision of R2-1914122 |
Ericsson | 37.34 15.7.0 CR#1552 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1915123 | Discussion on leftover issues of Inter-RAT measurement | discussion | Huawei, HiSilicon, China Unicom | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.2 |
available | [WTS] [JSN] | |
R2-1915124 | Discussion on SRVCC capability | discussion | Huawei, HiSilicon, China Unicom | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.2 |
available | [WTS] [JSN] | |
R2-1915125 | Running CR for the introduction of SRVCC from 5G to 3G |
draftCR revised to R2-1916272 |
Huawei, HiSilicon, China Unicom | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.1 |
revised | [WTS] [JSN] | |
R2-1915126 | Consideration on UL low-latency scheduling |
discussion revision of R2-1913085 |
Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | ||
R2-1915127 | Pre-emptive BSR in multiple connection scenario |
discussion revision of R2-1913086 |
Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | ||
R2-1915128 | Cell selection for IAB RLF recovery |
discussion revision of R2-1913087 |
Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | ||
R2-1915129 | RLF notification to downstream IAB node | discussion | Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | ||
R2-1915130 | Remaining issues for failure handling | discussion | Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.9.3.2 |
noted | [WTS] [JSN] | ||
R2-1915131 | Remaining issue for SL-BSR | discussion | Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1915132 | Considerations on QoS based resource pool for NR V2X |
discussion revision of R2-1912914 |
Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.4.4 |
available | [WTS] [JSN] | ||
R2-1915133 | Remaining issue on support non-integer periodicity for TSN traffic | discussion | Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | ||
R2-1915134 | SLRB configuration for NR V2X UE |
discussion revision of R2-1912647 |
Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | ||
R2-1915135 | Discussion on QoS management for NR V2X |
discussion revision of R2-1912648 |
Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | ||
R2-1915136 | Paging probability information based UE grouping |
discussion revision of R2-1912916 |
Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | ||
R2-1915137 | Consideration on WUS configuration |
discussion revision of R2-1912917 |
Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | ||
R2-1915138 | Remaining issue on ANR reporting | discussion | Lenovo, Motorola Mobility | Rel-16 |
R2-108 AI: 7.2.6 |
available | [WTS] [JSN] | ||
R2-1915139 | Solution for intra-UE prioritization | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | ||
R2-1915140 | Remaining issues on 4-step RACH for NR-U | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-108 AI: 6.2.2.1 |
noted | [WTS] [JSN] | ||
R2-1915141 | Handling of UL LBT failure | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | ||
R2-1915142 | Enhancement on two-step Random Access for NR-U | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-108 AI: 6.2.2.3 |
available | [WTS] [JSN] | ||
R2-1915143 | Discussion on PDU overwriting between CG and DG | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-108 AI: 6.2.2.5 |
available | [WTS] [JSN] | ||
R2-1915144 | Support of multiple active CGs for NRU | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-108 AI: 6.2.2.5 |
available | [WTS] [JSN] | ||
R2-1915145 | Impacts of Cross-COT HARQ feedback to BWP and Scell | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-108 AI: 6.2.2.7 |
noted | [WTS] [JSN] | ||
R2-1915146 | Handling MIB_SIB1 Acquisition Failure | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-108 AI: 6.2.3.2 |
noted | [WTS] [JSN] | ||
R2-1915147 | BSR and SR reporting in Cross RAT V2X operation | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.7 |
available | [WTS] [JSN] | ||
R2-1915148 | Cross RAT SL Configuration | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.7 |
available | [WTS] [JSN] | ||
R2-1915149 | HARQ feedback impact on RAN2 | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | ||
R2-1915150 | RLM Procedure and RLF Recovery handling | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | ||
R2-1915151 | Transmitter UE behavior in Mode 1 and Mode 2 | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1915152 | SL and UL BWP Numerology Mismatch | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | ||
R2-1915153 | Failure handling for conditional PScell change and addition | discussion | OPPO | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1915154 | SRB handling for DAPS handover | discussion | OPPO | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1915155 | Further considerations on capability coordination |
discussion revised to R2-2000655 |
OPPO | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1915156 | Clarification on HRNN reporting | discussion | OPPO | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.4 |
available | [WTS] [JSN] | |
R2-1915157 | SCell BFR MAC CE design | discussion | OPPO | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1915158 | MAC CE design for eMIMO | discussion | OPPO | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
available | [WTS] [JSN] | |
R2-1915159 | Further considerations for T312-based mechanism | discussion | OPPO | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.4 |
available | [WTS] [JSN] | |
R2-1915160 | Compliance check for CHO configuration | discussion | OPPO | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1915161 | CHO configuration handling upon source configuration update | discussion | OPPO | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1915162 | UE capabilities for DAPS HO |
discussion revised to R2-2000654 |
OPPO | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1915163 | Recovery for deprioritized data transmission |
discussion revision of R2-1913746 |
NTT DOCOMO, INC. | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1915164 | L2 impacts on supporting IIoT traffic |
discussion revision of R2-1913738 |
NTT DOCOMO, INC. | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | |
R2-1915165 | (De)Prioritizing the Access for IAB Setup | discussion | Samsung | NR_IAB-Core |
R2-108 AI: 6.1.5.3 |
available | [WTS] [JSN] | ||
R2-1915166 | Discussion on CG and SPS in NTN | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1915167 | Discussion on DRX operation in NTN | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1915168 | Discussion on time advance in NTN | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1915169 | Discussion on UL scheduling enhancement in NTN | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1915170 | Discussion on handover for NTN | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1915171 | NR RAT-Dependent Positioning Procedures | discussion | LG Electronics Inc. | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | ||
R2-1915172 | On indicating LBT failure for NR-U | discussion | Samsung | NR_unlic-Core |
R2-108 AI: 6.2.3.3 |
available | [WTS] [JSN] | ||
R2-1915173 | Resource Pool Configuration |
discussion revision of R2-1913274 |
LG Electronics Inc. | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1915174 | Considering valid PLMN being equivalent to the RPLMN in IDLE operations | discussion | Samsung | NR_unlic-Core |
R2-108 AI: 6.2.3.2 |
noted | [WTS] [JSN] | ||
R2-1915175 | NR V2X System Information Aspects |
discussion revision of R2-1913275 |
LG Electronics Inc. | Rel-16 |
R2-108 AI: 6.4.4 |
available | [WTS] [JSN] | ||
R2-1915176 | SLRB Configuration in NR V2X | discussion | LG Electronics Inc. | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | ||
R2-1915177 | Remaining issue on detecting UL LBT Failures | discussion | PANASONIC R&D Center Germany |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |||
R2-1915178 | Simultaneous Mode 1 and Mode 2 Configuration |
discussion revision of R2-1913277 |
LG Electronics Inc. | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | ||
R2-1915179 | Impact of disabling HARQ on DRX |
discussion revision of R2-1912570 |
PANASONIC R&D Center Germany |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |||
R2-1915180 | [Draft] Response LS on additional high layer information for sidelink physical layer operations |
LS out LS To: RAN1 |
LG Electronics Inc. | Rel-16 |
R2-108 AI: 6.4.2 |
withdrawn | [WTS] [JSN] | ||
R2-1915181 | Consideration on dormancy behavior | discussion | LG Electronics Inc. | LTE_NR_DC_CA_enh-Core |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | ||
R2-1915182 | Consideration on UE assistance information | discussion | LG Electronics Inc. | NR_UE_pow_sav-Core |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | ||
R2-1915183 | Remaining issues on PDCCH-WUS | discussion | LG Electronics Inc. | NR_UE_pow_sav-Core |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | ||
R2-1915184 | Temporary RS for fast SCell activation | discussion | LG Electronics Inc. | LTE_NR_DC_CA_enh-Core |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | ||
R2-1915185 | RLM for NR-U | discussion | Samsung | NR_unlic-Core |
R2-108 AI: 6.2.3.3 |
available | [WTS] [JSN] | ||
R2-1915186 | Discussion on SL radio link management |
discussion revision of R2-1913127 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |
R2-1915187 | Mobility challenges for NR V2X platooning/groupcast |
discussion revision of R2-1913160 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1915188 | Network Based Monitoring and Reporting of QoS parameters for NR V2X Sidelink |
discussion revision of R2-1913150 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1915189 | Discussion on SSB measurement in NTN | pCR | Huawei, HiSilicon | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.3 |
available | [WTS] [JSN] |
R2-1915190 | Discussion on feeder link switch for transparent LEO | pCR | Huawei, HiSilicon | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] |
R2-1915191 | Discussion on mobility with steerable beams in NTN | discussion | Huawei, HiSilicon | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1915192 | Service continuity between TN and NTN | pCR | Huawei, HiSilicon | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.3 |
available | [WTS] [JSN] |
R2-1915193 | On NR V2X Sidelink transmissions during Handover or Uu PHY layer problems |
discussion revision of R2-1913148 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1915194 | Discussion on application of SLRB configuration during UE state transition | discussion | Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | ||
R2-1915195 | Discussion on the support of simultaneous mode 1 and mode 2 | discussion | Nokia Denmark | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | ||
R2-1915196 | BAP mapping support for routing |
discussion revision of R2-1912935 revised to R2-2000903 |
CMCC | Rel-16 |
R2-108 AI: 6.1.3.2 |
available | [WTS] [JSN] | ||
R2-1915197 | Details on determining consistent LBT failure of a BWP |
discussion revised to R2-2000904 |
CMCC | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | ||
R2-1915198 | Further considerations on ephemeris data provision | discussion | CMCC | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | ||
R2-1915199 | Impact analysis of NR CA frame timing relaxation |
discussion revision of R2-1912941 |
CMCC | Rel-16 |
R2-108 AI: 6.10.7 |
noted | [WTS] [JSN] | ||
R2-1915200 | Further consideration on PRACH prioritization |
discussion revision of R2-1912942 |
CMCC | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | ||
R2-1915201 | Discussion on the flexible configuration of Maximum Data Rate Enumeration for UP Integrity Protection |
discussion revision of R2-1913172 revised to R2-2000906 |
CMCC, Huawei, Hisilicon | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | ||
R2-1915202 | Mobility-state-based cell reselection in NR for HSDN |
discussion revision of R2-1912944 |
CMCC, MediaTek Inc | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | ||
R2-1915203 | [107bis#86][NR L2 meas] running 38.314 | draft TS | CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
endorsed | [WTS] [JSN] | |
R2-1915204 | Summary of open points on L2 Measurements | discussion | CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
noted | [WTS] [JSN] | |
R2-1915205 | Discussion and TP for Number of active UEs for CU/DU split scenario | pCR | CMCC | 38.314 0.0.3 | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] |
R2-1915206 | Discussion and TP for End-to-End RAN Part of Packet Delay Measurement | pCR | CMCC | 38.314 0.0.3 | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] |
R2-1915207 | Remaining Issues on Supporting M1 to M9 in L2 measurements | discussion | CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1915208 | UE capability for SON MDT WI | discussion | CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915209 | TS 38.306 CR on UE capabilities for SON MDT WI | draftCR | CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915210 | Discussion on power saving for inter-frequency measurements |
discussion revision of R2-1912959 revised to R2-2000913 |
CMCC | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | ||
R2-1915211 | Consideration of successful HO report | discussion | CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915212 | Further discussion on handling of de-prioritized MAC PDU | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1915213 | Further discussion on IE design of TimeReferenceInfo used for IIOT | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.1 |
available | [WTS] [JSN] | |
R2-1915214 | Further discussion of the details of reporting UE orientation sensor data | discussion | CMCC,Huawei | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915215 | Discussion on the new RA-RNTI for MsgB | discussion | CMCC | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | ||
R2-1915216 | Discussion on 2-step CFRA | discussion | CMCC | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | ||
R2-1915217 | Discussion on the maximum number of configured CHO candidate cells | discussion | CMCC | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | ||
R2-1915218 | Discussion on fast handover failure recovery | discussion | CMCC | Rel-16 |
R2-108 AI: 6.9.3.4 |
available | [WTS] [JSN] | ||
R2-1915219 | Further consideration on EN-DC cell reselection |
discussion revision of R2-1913233 |
CMCC, Huawei, vivo, ZTE, OPPO, xiaomi | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | ||
R2-1915220 | Discussion on support of NR RAN sharing |
discussion revision of R2-1913286 |
CMCC | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | ||
R2-1915221 | Support of dynamic HARQ process ID sharing in NR-U | discussion | Samsung | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.5 |
noted | [WTS] [JSN] | |
R2-1915222 | Applicability of NR-U features to licensed carrier |
discussion revised to R2-2000535 |
Samsung | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.7 |
available | [WTS] [JSN] | |
R2-1915223 | To reduce SCell activation delay in NR |
discussion revision of R2-1912476 |
Samsung | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1915224 | Support of unaligned frame boundary for inter-band TDD CA |
discussion revision of R2-1912477 |
Samsung | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.7 |
noted | [WTS] [JSN] | |
R2-1915225 | TA handling in 2-step RACH |
discussion revision of R2-1912478 |
Samsung | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1915226 | Local route selection in IAB | discussion | Sony | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |
R2-1915227 | IAB System information handling |
discussion revised to R2-2000824 |
Sony | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.3 |
available | [WTS] [JSN] | |
R2-1915228 | How to handle the deprioritized PDU for uplink Intra-UE prioritization |
discussion revised to R2-2000825 |
Sony | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1915229 | Consideration on activation/deactivation for CG Type 1 |
discussion revision of R2-1913353 |
Sony | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | |
R2-1915230 | Location report in NTN |
discussion revision of R2-1913354 |
Sony | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1915231 | Fallback to 4-step RACH with BI | discussion | Sony | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1915232 | Power Saving techniques, UE assistance information |
discussion revision of R2-1913358 revised to R2-2000826 |
SONY | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915233 | UE power saving for inter frequency measurements |
discussion revised to R2-2000827 |
Sony | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1915234 | Details of Relaxed monitoring for NR UE power saving | discussion | Sony | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1915235 | UE-group wake-up signal for MTC/NB-IoT |
discussion revised to R2-2000828 |
Sony | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | |
R2-1915236 | Cell selection/reselection with NPN cells | discussion | Sony | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1915237 | Mobility enhancements for Connectivity to 5GC for MTC and NB-IoT |
discussion revision of R2-1913364 revised to R2-2000830 |
Sony | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2. |
available | [WTS] [JSN] | |
R2-1915238 | Discussion on differnt RAT dependent NR Positioning techniques | discussion | Sony | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |
R2-1915239 | Applying un-used RNTIs for MsgB of 2-Step RACH | discussion | Sony | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1915240 | Differentiating MsgB with and without RRC messages |
discussion revised to R2-2000831 |
Sony | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1915241 | PUR L1 ACK and application layer response | discussion | Sony | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1915242 | RNTI ambiguity for CFRA and CBRA of 4-Step RACH |
discussion revised to R2-2000832 |
Sony | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915243 | Expected signalling flows for SN-initiated PSCell change | discussion | NEC | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1915244 | Network configuration for fast MCG recovery | discussion | NEC | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.5 |
available | [WTS] [JSN] | |
R2-1915245 | UE-assisted Activation/Deactivation for UL PDCP Duplication Enhancements | discussion | III | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.2 |
available | [WTS] [JSN] | |
R2-1915246 | Transfer of segmented UECapabilityInformation by SRB2 |
discussion revision of R2-1912513 revised to R2-2000765 |
Samsung | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.3 |
available | [WTS] [JSN] | |
R2-1915247 | MAC CE design for support of multiple beam indication for single PDCCH-based multiple TRPs |
discussion revision of R2-1912514 |
Samsung | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
available | [WTS] [JSN] | |
R2-1915248 | Reduction of signaling and latency for beam managements | discussion | Samsung | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
available | [WTS] [JSN] | |
R2-1915249 | Discussion on the additional UE capability filtering to limit the total number of carriers in NR |
discussion revision of R2-1912516 revised to R2-2000768 |
Samsung | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1915250 | Additional UE capability filtering to limit the total number of carriers in NR | CR | Samsung | 38.331 15.7.0 CR#1363 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915251 | Additional UE capability filtering to limit the total number of carriers in NR | CR | Samsung | 38.306 15.7.0 CR#197 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915252 | Change on transfer-type of handoverCommandMessage for NR SA handover | CR | Samsung | 38.331 15.7.0 CR#1364 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
not pursued | [WTS] [JSN] |
R2-1915253 | Clarification regarding conditions of setting omitEN-DC for mrdc-Request | CR | Samsung | 38.331 15.7.0 CR#1365 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
not pursued | [WTS] [JSN] |
R2-1915254 | MAC running CR for NR eMIMO | CR | Samsung | 38.321 15.7.0 CR#676 catB | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
not treated | [WTS] [JSN] |
R2-1915255 | Consideration on the variables for 2-step RACH | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.13.2 |
withdrawn | [WTS] [JSN] | |||
R2-1915256 | Running CR to 38.321 on Integrated Access and Backhaul for NR |
CR revised to R2-1916539, R2-2000760 |
Samsung Electronics GmbH | 38.321 15.7.0 CR#677 catB | NR_IAB | Rel-16 |
R2-108 AI: 6.1.1 |
revised | [WTS] [JSN] |
R2-1915257 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC | other | Document Rapporteur (BlackBerry) | LTE_eMTC5-Core, NB_IOTenh3-Core |
R2-108 AI: 7.2.1 |
noted | [WTS] [JSN] | ||
R2-1915258 | Way forward on pre-emptive BSR |
discussion revised to R2-1915538 |
Samsung, Lenovo, Nokia, Nokia Shanghai Bell, Huawei, Futurewei, LG, Sequans Communications, Intel, Kyocera |
R2-108 AI: 6.1.4.1 |
revised | [WTS] [JSN] | |||
R2-1915259 | Summary of email discussion [107bis#47][NR TEI16] Overheating | discussion | Huawei, Huawei Device | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1915260 | 36.331 CR for addressing overheating issue in (NG)EN-DC |
CR revised to R2-2001325 |
Huawei, Huawei Device | 36.331 15.7.0 CR#4176 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915261 | 38.331 CR for addressing overheating issue in (NG)EN-DC |
CR revised to R2-2001326 |
Huawei, Huawei Device | 38.331 15.7.0 CR#1413 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915262 | On the enhancement of SRS carrier switching capability |
discussion revised to R2-2001327 |
Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1915263 | Further discussion on the impact of PDCCH-WUS | discussion | Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1915264 | Remaining issues on UE assistance information for power saving | discussion | Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915265 | Remaining issues on UE capability ID |
discussion revision of R2-1912406 |
Huawei, HiSilicon | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.2 |
noted | [WTS] [JSN] | |
R2-1915266 | Remaining issues on UE capability segmentation |
discussion revision of R2-1912407 |
Huawei, HiSilicon | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.3 |
available | [WTS] [JSN] | |
R2-1915267 | Downlink hop-by-hop flow control | discussion | Samsung Electronics GmbH |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | |||
R2-1915268 | Draft CR for 2-step CFRA | draftCR | ZTE Corporation, Sanechips | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1915269 | On the need for bearer ID in the BAP header | discussion | Samsung Electronics GmbH |
R2-108 AI: 6.1.4.1 |
noted | [WTS] [JSN] | |||
R2-1915270 | Discussion on NR SL lower layer procedures | discussion | Ericsson | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1915271 | Remaining issues on RLC AM and UM support in SL | discussion | Ericsson | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1915272 | Support of HARQ procedure over sidelink | discussion | Ericsson | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1915273 | Discussion on configured grant left issues | discussion | Ericsson | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | ||
R2-1915274 | Discussion on SL link management | discussion | Ericsson | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | ||
R2-1915275 | Discussion on NR SL QoS management | discussion | Ericsson | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | ||
R2-1915276 | Discussion on PDCP left issues | discussion | Ericsson | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1915277 | Discussion on priority configuration | discussion | Ericsson | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | ||
R2-1915278 | Upstream routing ID | discussion | Samsung Electronics GmbH |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |||
R2-1915279 | Running CR for 36.300 on CA/DC Enhancements |
draftCR revised to R2-1916518 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.1 |
revised | [WTS] [JSN] | |
R2-1915280 | Running CR for 38.300 for CA/DC Enhancements |
draftCR revised to R2-1916519 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.1 |
revised | [WTS] [JSN] | |
R2-1915281 | Running CR for 36.331 for CA/DC Enhancements | draftCR | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1915282 | Running CR for 38.331 on CA/DC Enhancements | draftCR | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1915283 | Idle measurement configuration in UE Inactive AS context | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1915284 | Remaining issues for early measurement results and configurations | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
noted | [WTS] [JSN] | |
R2-1915285 | Applicability of early measurement solutions for LTE | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
noted | [WTS] [JSN] | |
R2-1915286 | Delta configurations for early measurement configurations | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1915287 | Correction for P-Max in FR2 |
CR revision of R2-1913195 |
Ericsson, NTT DOCOMO INC. | 38.331 15.7.0 CR#12921 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R2-1915288 | A second SSB periodicity in Idle and Inactive mode | discussion | Ericsson | NR_newRAT-Core | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1915289 | cDRX enhancement for CA |
discussion revision of R2-1913196 |
Ericsson, Qualcomm Inc., Samsung, Verizon, Deutsche Telekom | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915290 | Introduction of secondary DRX group | draftCR | Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915291 | Introduction of secondary DRX group | draftCR | Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915292 | Email report [107bis#49][NR TEI16] cDRX enhancement for CA | report | Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
noted | [WTS] [JSN] | |
R2-1915293 | RAN2 impact of WUS in connected mode | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1915294 | UE Assistance Information for cDRX and SCell | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915295 | UE Assistance Information for minimum K0 and K2 | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915296 | RRM measurement relaxation | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1915297 | Stop using redirectedCarrierOffsetDedicated after reselection to another frequency |
CR revised to R2-1916422 |
Huawei, HiSilicon | 36.331 15.7.0 CR#4144 catF | NB_IOTenh-Core, TEI15 | Rel-15 |
R2-108 AI: 4.1 |
revised | [WTS] [JSN] |
R2-1915298 | Introduction of additional enhancements for NB-IoT in TS 36.331 |
draftCR revision of R2-1914101 revised to R2-1916566 |
Huawei | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R2-1915299 | Introduction of additional enhancements for NB-IoT |
draftCR revision of R2-1914094 revised to R2-1916567 |
Huawei | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R2-1915300 | Discussion on SON ANR remaining open issues | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.6 |
available | [WTS] [JSN] | |
R2-1915301 | Discussion on SON RACH and RLF remaining open issues | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.6 |
available | [WTS] [JSN] | |
R2-1915302 | Introduction of UE specific DRX for NB-IoT | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.11 |
available | [WTS] [JSN] | |
R2-1915303 | Introduction of UE specific DRX for NB-IoT in 36.300 | draftCR | Huawei | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.11 |
available | [WTS] [JSN] | |
R2-1915304 | Introduction of UE specific DRX for NB-IoT in 36.304 | draftCR | Huawei | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.11 |
available | [WTS] [JSN] | |
R2-1915305 | Introduction of UE specific DRX for NB-IoT in 36.306 | draftCR | Huawei | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.11 |
available | [WTS] [JSN] | |
R2-1915306 | Introduction of UE specific DRX for NB-IoT in 36.331 | draftCR | Huawei | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.11 |
available | [WTS] [JSN] | |
R2-1915307 | Addressing Editor's Notes and FFSs in 36.300 running CR for NB-IoT | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
available | [WTS] [JSN] | |
R2-1915308 | Clarification on default configuration and SRB1 for UP-EDT |
CR revision of R2-1914043 revised to R2-1916356 |
Huawei, HiSilicon | 36.331 15.7.0 CR#41042 catF | LTE_eMTC4-Core, NB_IOTenh2-Core | Rel-15 |
R2-108 AI: 4.2 |
revised | [WTS] [JSN] |
R2-1915309 | Discussion on remaining aspects of MT-EDT | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.1.2 |
noted | [WTS] [JSN] | |
R2-1915310 | Discussion on configuration for WUS grouping | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | |
R2-1915311 | FFSes on D-PUR | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
noted | [WTS] [JSN] | |
R2-1915312 | Handling of D-PUR configuration for CP solution |
discussion revision of R2-1912610 revised to R2-2000640 |
Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1915313 | [Draft] LS on handling of D-PUR configuration for the CP solution |
LS out LS To: RAN3 revision of R2-1912611 |
Huawei | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1915314 | Multiple TBs scheduling in NB-IoT | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.1.5 |
noted | [WTS] [JSN] | |
R2-1915315 | Discussion on paging of RRC_INACTIVE for eMTC connected to 5GC | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.1.12 |
noted | [WTS] [JSN] | |
R2-1915316 | Access Stratum Release Assistance Indicator for eMTC and NB-IoT connected to 5GC | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2. |
available | [WTS] [JSN] | |
R2-1915317 | Report of email discussion [107bis#89][NB-IoT R16] Open issues on UAC in NB-IoT | report | Huawei | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2. |
noted | [WTS] [JSN] | |
R2-1915318 | Support of RRC connection Re-establishment for the Control plane for NB-IoT connected to 5GC | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2. |
noted | [WTS] [JSN] | |
R2-1915319 | Discussion on SA2 reply LS on WUS assistance information | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
noted | [WTS] [JSN] | |
R2-1915320 | [Draft] Reply LS on WUS assistance information |
LS out LS is reply to R2-1914346 LS To: SA2, RAN3, CT1 |
Huawei | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | |
R2-1915321 | Details of hop-by-hop flow control | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | |
R2-1915322 | Buffer status reporting for IAB | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | |
R2-1915323 | eLCID space and handling of IAB specific MAC Ces | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.2 |
available | [WTS] [JSN] | |
R2-1915324 | Signalling for IAB timing | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.3 |
noted | [WTS] [JSN] | |
R2-1915325 | Signalling for radio aware scheduling | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
noted | [WTS] [JSN] | |
R2-1915326 | RNTI design for MsgB reception | discussion | Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1915327 | 2-step RACH only BWP | discussion | Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1915328 | HARQ ACK resources for successRAR | discussion | Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1915329 | Draft LS on HARQ ACK resources for successRAR |
LS out LS To: TSG RAN WG1 |
Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1915330 | CFRA for 2-step RACH | discussion | Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1915331 | Summary of email discussion [107bis#61][NR][eMIMO] | discussion | Nokia, Nokia Shanghai Bell | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
noted | [WTS] [JSN] | |
R2-1915332 | Remaining details of SCell BFR | discussion | Nokia, Nokia Shanghai Bell | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1915333 | CFRA resource handling for BFR upon TAT expiry | discussion | Nokia, Nokia Shanghai Bell, Apple | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915334 | New CG Confirmation MAC CE | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | |
R2-1915335 | Configured Grant with Periodicity of any Integer Number of Slots | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.3 |
available | [WTS] [JSN] | |
R2-1915336 | MAC CE for RLC Activation and Deactivation | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1915337 | Configuration of Multiple CG/SPS Configurations | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |
R2-1915338 | MAC Running CR for NR IIOT | draftCR | Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.1 |
endorsed | [WTS] [JSN] | |
R2-1915339 | Initial Value of RX_DELIV | discussion | Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915340 | Prioritization of SR Transmission for URLLC |
discussion revision of R2-1912495 |
Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.3 |
available | [WTS] [JSN] | |
R2-1915341 | Reference Cell for Reference SFN | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.1 |
available | [WTS] [JSN] | |
R2-1915342 | Priority Value of an Uplink Grant | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |
R2-1915343 | Remaining issues with extending LCID space on the backhaul | discussion | Samsung Electronics GmbH |
R2-108 AI: 6.1.4.2 |
available | [WTS] [JSN] | |||
R2-1915344 | Considerations on control plane for DAPS | discussion | Huawei, HiSilicon, China Telecom | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1915345 | Further consideration on reply LSs from RAN1 and RAN4 | discussion | Huawei, HiSilicon, China Telecom | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.1 |
available | [WTS] [JSN] | |
R2-1915346 | Discussion on handover preparation for DAPS | discussion | Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1915347 | Discussion on PDCP duplication and reordering for DAPS HO | discussion | Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1915348 | Discussion on UE capability sharing for DAPS | discussion | Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1915349 | Clarification of DAPS handover support in 38.300 | discussion | Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.1 |
available | [WTS] [JSN] | |
R2-1915350 | Draft CR for 36.323 on supporting DAPS handover |
draftCR revised to R2-1916319 |
Huawei, HiSilicon, Mediatek Inc. | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
revised | [WTS] [JSN] | |
R2-1915351 | Draft CR for 38.323 on supporting DAPS handover | draftCR | Huawei, HiSilicon, Mediatek Inc. | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
endorsed | [WTS] [JSN] | |
R2-1915352 | Stop timer T310 in SCGFailureInformation | CR | Ericsson | 38.331 15.7.0 CR#1366 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
not pursued | [WTS] [JSN] |
R2-1915353 | (IPA) Handling of AS-Config in HandoverPreparationInformation |
CR revision of R2-1913297 revised to R2-1916513 |
Ericsson | 38.331 15.7.0 CR#13001 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5 |
revised | [WTS] [JSN] |
R2-1915354 | (IPA) Corrections on scg-RB-Config in CG-Config |
CR revision of R2-1913298 revised to R2-1916476 |
Ericsson | 38.331 15.7.0 CR#13011 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
revised | [WTS] [JSN] |
R2-1915355 | Clarification on timer T304 for SCGFailureInformation | CR | Ericsson | 38.331 15.7.0 CR#1367 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
merged | [WTS] [JSN] |
R2-1915356 | Email discussion on remaining issues for correction on the condition of RBTermChange | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.2 |
noted | [WTS] [JSN] | |
R2-1915357 | Email discussion on security key derivation | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
noted | [WTS] [JSN] | |
R2-1915358 | Correction on security key derivation |
CR revised to R2-1916534 |
Ericsson | 36.331 15.7.0 CR#4145 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
revised | [WTS] [JSN] |
R2-1915359 | Correction on security key derivation |
CR revised to R2-1916535 |
Ericsson | 38.331 15.7.0 CR#1368 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
revised | [WTS] [JSN] |
R2-1915360 | Corrections to power limitations in (NG)EN-DC |
CR revision of R2-1914167 |
Ericsson, Qualcomm Incorporated, MediaTek Inc., Nokia, Nokia Shanghai Bell | 36.331 15.7.0 CR#41192 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.2 |
agreed | [WTS] [JSN] |
R2-1915361 | (IPA) Correction of SRB3 handling at full configuration (Alt2) |
CR revision of R2-1914172 revised to R2-1916514 |
Ericsson | 38.331 15.7.0 CR#13082 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5 |
revised | [WTS] [JSN] |
R2-1915362 | (IPA) Correction to integrity protection in DRB addition and modification |
CR revision of R2-1913310 revised to R2-1916474 |
Ericsson | 38.331 15.7.0 CR#13091 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
revised | [WTS] [JSN] |
R2-1915363 | Correction on MCG measurements in SCGFailureInformation |
CR revision of R2-1913302 revised to R2-1916525 |
Ericsson | 38.331 15.7.0 CR#13051 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.3 |
revised | [WTS] [JSN] |
R2-1915364 | Correction on SCGFailureInformation |
CR revision of R2-1913303 |
Ericsson | 38.331 15.7.0 CR#13061 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.3 |
not pursued | [WTS] [JSN] |
R2-1915365 | (IPA) Correction on sending Failure Information via SRB3 |
CR revision of R2-1913980 revised to R2-1916471 |
Ericsson, ZTE Corporation (Rapporteur), Huawei | 37.34 15.7.0 CR#1592 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1915366 | Correction on the condition of RBTermChange |
CR revised to R2-1916479 |
Ericsson | 38.331 15.7.0 CR#1369 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.2 |
revised | [WTS] [JSN] |
R2-1915367 | (IPA) Correction to SIB5 acquisition for idle mode measurements |
CR revision of R2-1913984 revised to R2-1916303 |
Ericsson | 36.331 15.7.0 CR#41202 catF | LTE_5GCN_connect-Core, LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1915368 | (IPA)Correction on inter-frequency neighbour cell measurements |
CR revision of R2-1913985 |
Ericsson | 36.331 15.7.0 CR#4184 catF | LTE_5GCN_connect-Core, LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5 |
withdrawn | [WTS] [JSN] |
R2-1915369 | Stop timer T313 in SCGFailureInformation for NE-DC | CR | Ericsson | 36.331 15.7.0 CR#4146 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.2 |
not treated | [WTS] [JSN] |
R2-1915370 | (IPA) Miscellaneous correction for late drop |
CR revision of R2-1914173 revised to R2-1916494 |
Ericsson | 36.331 15.7.0 CR#41172 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.2 |
revised | [WTS] [JSN] |
R2-1915371 | Unaligned frame boundary with slot alignment and partial SFN alignment | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.7 |
noted | [WTS] [JSN] | |
R2-1915372 | NR-DC power control |
discussion revision of R2-1912542 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.2 |
noted | [WTS] [JSN] | |
R2-1915373 | Sending on-demand SIB(s) request over SRB3 | discussion | Ericsson | NR_unlic-Core, 5G_V2X_NRSL-Core, NR_IIOT-Core, LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.21 |
noted | [WTS] [JSN] | |
R2-1915374 | [107bis#07][NR R16] Running CR on 38.300 for on-demand SI procedure in RRC_CONNECTED | draftCR | Ericsson | NR_unlic-Core, 5G_V2X_NRSL-Core, NR_IIOT-Core, LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.21 |
endorsed | [WTS] [JSN] | |
R2-1915375 | [107bis#07][NR R16] Running CR on 38.331 for on-demand SI procedure in RRC_CONNECTED |
draftCR revised to R2-1916522 |
Ericsson | NR_unlic-Core, 5G_V2X_NRSL-Core, NR_IIOT-Core, LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.21 |
revised | [WTS] [JSN] | |
R2-1915376 | Draft Reply LS on resource coordination between NG-RAN nodes for NR V2X sidelink communication |
LS out LS is reply to R2-1914330 source LS: R3-196280 LS To: RAN3 revised to R2-1916444 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1915377 | Inter-node resource coordination in NR SL |
discussion revision of R2-1913319 revised to R2-2000885 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |
R2-1915378 | Discussion on SL Mode 2 left issues |
discussion revision of R2-1913323 revised to R2-2000882 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.4 |
available | [WTS] [JSN] | |
R2-1915379 | Discussion on SL information reporting over Uu |
discussion revision of R2-1913324 revised to R2-2000881 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915380 | Running CR for 38.322 for NR V2X |
draftCR revised to R2-1916449 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1915381 | Discussion on SL AS configuration handling over NR Uu |
discussion revision of R2-1913332 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915382 | Remaining issues on capability transfer in sidelink |
discussion revision of R2-1913333 revised to R2-2000886 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1915383 | Handling of SL in Uu RRC state transitions |
discussion revision of R2-1913334 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915384 | Network and cell (re)selection in SNPN access mode |
discussion revision of R2-1912656 |
Nokia, Nokia Shanghai Bell | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
noted | [WTS] [JSN] | |
R2-1915385 | RRC considerations to support SNPNs |
discussion revision of R2-1912657 |
Nokia, Nokia Shanghai Bell | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.3 |
available | [WTS] [JSN] | |
R2-1915386 | Discussion on PCI list | discussion | Nokia, Nokia Shanghai Bell | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1915387 | Report from Email Discussion [107bis#63] on SIB1 design | discussion | Nokia (Rapporteur) | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
noted | [WTS] [JSN] | |
R2-1915388 | Draft RRC CR for NPN |
draftCR revised to R2-2000399 |
Nokia (Rapporteur) | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
endorsed | [WTS] [JSN] | |
R2-1915389 | Discussion on PLMN and Cell selection enhancements for NR-U | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.2 |
noted | [WTS] [JSN] | |
R2-1915390 | RLM/RLF measurement on NR-U |
discussion revision of R2-1912659 |
Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.3 |
available | [WTS] [JSN] | |
R2-1915391 | Draft TS 38.340 (BAP) | draft TS | Huawei | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.1 |
withdrawn | [WTS] [JSN] | |
R2-1915392 | Even further views on NR V2X System Information |
discussion revision of R2-1913146 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915393 | Running CR on 36.321 for eMTC |
draftCR revised to R2-1916362 |
Ericsson | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
revised | [WTS] [JSN] | |
R2-1915394 | Remaining issues in Msg4-based MT EDT | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-108 AI: 7.1.2 |
reserved | [WTS] [JSN] | ||
R2-1915395 | Scheduling enhancements for LTE-MTC and NB-IoT | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-108 AI: 7.1.5 |
noted | [WTS] [JSN] | ||
R2-1915396 | MPDCCH performance improvement for LTE-M | discussion | Ericsson | LTE_eMTC5-Core |
R2-108 AI: 7.1.7 |
noted | [WTS] [JSN] | ||
R2-1915397 | Remaining issues for ETWS/CMAS notification delivery in connected mode for non-BL UEs | discussion | Ericsson | LTE_eMTC5-Core |
R2-108 AI: 7.1.8 |
available | [WTS] [JSN] | ||
R2-1915398 | UE capabilities for enhancements for non-BL UEs | discussion | Ericsson | LTE_eMTC5-Core |
R2-108 AI: 7.1.8 |
noted | [WTS] [JSN] | ||
R2-1915399 | Reception type for ETWS/CMAS for non-BL UE in CE in RRC_CONNECTED | discussion | Ericsson | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.8 |
withdrawn | [WTS] [JSN] | |
R2-1915400 | S-Criterion interpretation for non-BL UEs | discussion | Ericsson | LTE_eMTC5-Core |
R2-108 AI: 7.1.8 |
noted | [WTS] [JSN] | ||
R2-1915401 | Cell Reselection improvement for LTE-M Standalone cells |
discussion revision of R2-1913117 revised to R2-2000980 |
Ericsson | LTE_eMTC5-Core |
R2-108 AI: 7.1.9 |
available | [WTS] [JSN] | ||
R2-1915402 | Coexistence with NR for LTE-M | discussion | Ericsson | LTE_eMTC5-Core |
R2-108 AI: 7.1.11 |
available | [WTS] [JSN] | ||
R2-1915403 | eDRX in RRC_INACTIVE for LTE-M | discussion | Ericsson | LTE_eMTC5-Core |
R2-108 AI: 7.1.12 |
available | [WTS] [JSN] | ||
R2-1915404 | Running CR on 36.321 for NB-IoT |
draftCR revised to R2-1916568 |
Ericsson | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R2-1915405 | PUR periodicity and UE multiplexing | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R2-1915406 | PUR with DCI scheduling | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-108 AI: 7.2.4 |
withdrawn | [WTS] [JSN] | ||
R2-1915407 | PUR - Remaining open issues | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-108 AI: 7.2.4 |
noted | [WTS] [JSN] | ||
R2-1915408 | On the need for PUR L1 ACK application layer response | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-108 AI: 7.2.4 |
noted | [WTS] [JSN] | ||
R2-1915409 | Draft LS reply PUR transmission for NB-IoT/eMTC |
LS out LS is reply to R2-1914304 LS To: RAN1 revised to R2-1916426 |
Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.4 |
revised | [WTS] [JSN] | |
R2-1915410 | Coexistence with NR for NB-IoT | discussion | Ericsson | NB_IOTenh3-Core |
R2-108 AI: 7.2.9 |
available | [WTS] [JSN] | ||
R2-1915411 | Discussion on remaining issues of Immediate MDT | discussion | ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915412 | Discussion on remaining issues of Logged MDT | discussion | ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915413 | Immediate MDT continuity upon handover procedure |
discussion revision of R2-1913074 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915414 | Restriction on MDT measurement and report | discussion | ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915415 | Clarification on out-of-coverage measurement and report | discussion | ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915416 | Clarification on connected UE counting in CA | discussion | ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1915417 | Further consideration on INACTIVE UE counting | discussion | ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1915418 | Discussion on PRB usage of a cell |
discussion revision of R2-1913081 revised to R2-2001419 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1915419 | Further considerations on RACH optimization |
discussion revision of R2-1913078 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915420 | Discussion on RLF report | discussion | ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915421 | Enhancement on Msg1 based SI request | CR | ZTE Corporation, Sanechips | 38.321 15.7.0 CR#678 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1915422 | Consideration on SR and DRX in NTN | discussion | ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1915423 | On SSB-ToMeasure clarifications | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
available | [WTS] [JSN] | |
R2-1915424 | CR to 38.331 on SSB-ToMeasure clarifications | CR | Ericsson | 38.331 15.7.0 CR#1370 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1915425 | CR to 36.331 on SSB-ToMeasure clarifications | CR | Ericsson | 36.331 15.7.0 CR#4147 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1915426 | CR to 36.331 on performing L3 filtering for NR related measurements |
CR revised to R2-1916475 |
Ericsson | 36.331 15.7.0 CR#4148 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
revised | [WTS] [JSN] |
R2-1915427 | CR to 38.331 on A2 event definition clarification | CR | Ericsson | 38.331 15.7.0 CR#1371 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1915428 | CR to 36.331 on A2 event definition clarification | CR | Ericsson | 36.331 15.7.0 CR#4149 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
not treated | [WTS] [JSN] |
R2-1915429 | Triggering conditions for A1-A6 events in NR | discussion | Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1915430 | CR to 38.331 on Triggering conditions for A1 to A6 events in NR | CR | Ericsson | 38.331 15.7.0 CR#1372 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915431 | CR to 38.306 on Triggering conditions for A1 to A6 events in NR | CR | Ericsson | 38.306 15.7.0 CR#198 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915432 | Open issues of L2 measurements in NR | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1915433 | Open issues related to RACH report | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
noted | [WTS] [JSN] | |
R2-1915434 | Open issues related to RLF report | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915435 | Successful handover report in NR | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915436 | Open issues of CEF report | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915437 | 107bis#87 email discussion report on running CR for SON | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
noted | [WTS] [JSN] | |
R2-1915438 | Running CR to 38.331 on NR SON | CR | Ericsson | 38.331 15.7.0 CR#1373 catB | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
endorsed | [WTS] [JSN] |
R2-1915439 | Discussion on QoS flow in SLRB | discussion | Apple | FS_NR_V2X | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1915440 | Disucssion on PC5 RRC left issues | discussion | Apple | FS_NR_V2X | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1915441 | Draft LS on keep alive function |
LS out LS To: SA2 |
Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1915442 | UL-SL Prioritization under SL incapable RAN |
discussion revised to R2-2000608 |
Apple | FS_NR_V2X | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915443 | SL Synchronization under Async gNB(s) | discussion | Apple | FS_NR_V2X | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1915444 | Maximum Data Rate Enumeration for UP Integrity Protection |
discussion revised to R2-2000604 |
Apple, ZTE Corporation, Sanechips | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1915445 | Draft LS on Maximum Data Rate Enumeration for UP Integrity Protection |
LS out LS To: CT1 revised to R2-2000605 |
Apple | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1915446 | Handling of fallbacks for combined contiguous and non-contiguous CA in FR2 | discussion | Apple | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
noted | [WTS] [JSN] | |
R2-1915447 | CR to TS38.331 on FR2 intra band contiguous and non-contiguous CA fallback | CR | Apple | 38.331 15.7.0 CR#1374 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1915448 | CR to TS38.306 on FR2 intra band contiguous and non-contiguous CA fallback | CR | Apple | 38.306 15.7.0 CR#199 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1915449 | Introduction to additional enhancements NB-IoT Rel-16 |
draftCR revised to R2-1916569 |
BlackBerry UK Limited | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R2-1915450 | Loading Control in the RACH Type Selection |
discussion revision of R2-1912692 |
PANASONIC R&D Center Germany |
R2-108 AI: 6.13.3 |
available | [WTS] [JSN] | |||
R2-1915451 | Remaining issues on the PDCP anchor relocation for DPAS based handover |
discussion revision of R2-1913053 |
NEC | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1915452 | DL PDCP handling for RLC UM |
discussion revision of R2-1913054 |
NEC | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1915453 | Further consideration on capability coordination for DAPS based handover | discussion | NEC | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1915454 | RLF report for CHO |
discussion revision of R2-1913057 |
NEC | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.2 |
noted | [WTS] [JSN] | |
R2-1915455 | Combination of CHO and DAPS | discussion | NEC | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1915456 | Remaining issues for routing | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |
R2-1915457 | Remaining issues for bearer mapping | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.2 |
available | [WTS] [JSN] | |
R2-1915458 | Flow control for IAB networks | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | |
R2-1915459 | Way forward and TP for the pre-BSR |
draftCR revised to R2-1916537 |
Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
revised | [WTS] [JSN] | |
R2-1915460 | RACH related issues for IAB | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.3 |
available | [WTS] [JSN] | |
R2-1915461 | Backhaul RLF Recovery | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |
R2-1915462 | Discussion on F1AP over LTE in NSA | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |
R2-1915463 | Running CR to 36.331 on Integrated Access and Backhaul for NR of NSA | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |
R2-1915464 | TP for TS 38.304 and 36.304 on the impacts of idle procedure | draftCR | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.3 |
available | [WTS] [JSN] | |
R2-1915465 | T_delta of IAB DL transmission timing alignment | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.3 |
noted | [WTS] [JSN] | |
R2-1915466 | Discussion on the BAP PDU format | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.4 |
available | [WTS] [JSN] | |
R2-1915467 | Support of UE PDCP duplication | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |
R2-1915468 | Draft CR to 36.331 on Integrated Access and Backhaul for (NG)EN-DC |
draftCR revised to R2-1916573 |
Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.2 |
revised | [WTS] [JSN] | |
R2-1915469 | Running CR to TS 38.331 on IAB for NR |
draftCR revised to R2-1916574 |
Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.2 |
revised | [WTS] [JSN] | |
R2-1915470 | Draft CR to TS 38.331 on IAB for TDD UL DL Change of Configuration | draftCR | Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.2 |
available | [WTS] [JSN] | |
R2-1915471 | On Multi-connectivity for IAB | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |
R2-1915472 | Backhaul Adaptation Protocol (BAP) Header for IAB Networks | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.4 |
available | [WTS] [JSN] | |
R2-1915473 | Further Discussion on BAP Layer Signaling | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.4 |
available | [WTS] [JSN] | |
R2-1915474 | Remaining Issues Related to Flow Control | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.3 |
available | [WTS] [JSN] | |
R2-1915475 | Way forward on pre-emptive BSR in IAB networks | discussion | Ericsson, Sony | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
noted | [WTS] [JSN] | |
R2-1915476 | IP Address Assignment for IAB Nodes | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.2 |
available | [WTS] [JSN] | |
R2-1915477 | Further details on Backhaul link RLF Notification Types to Downstream Node(s) | discussion | Ericsson, Song | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.1 |
withdrawn | [WTS] [JSN] | |
R2-1915478 | Summary for Email Discussion [107bis#40] [IAB] SI Broadast, barring, Initial access, Connection setup (Ericsson) | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.3 |
noted | [WTS] [JSN] | |
R2-1915479 | Cell reservations, UAC, and initial access aspects in IAB networks | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.3 |
available | [WTS] [JSN] | |
R2-1915480 | RRC Connection Re-establishment cause values for IAB nodes | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.3 |
available | [WTS] [JSN] | |
R2-1915481 | Security for inter-IAB node Signalling | discussion | Ericsson | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | ||
R2-1915482 | Correction on the Msg3 based on demand system information |
CR revision of R2-1913673 |
Huawei, HiSilicon | 38.331 15.7.0 CR#13331 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1915483 | Correction on the configuration of split SRB |
CR revised to R2-1916480 |
Huawei, HiSilicon, Samsung | 38.331 15.7.0 CR#1375 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.2 |
revised | [WTS] [JSN] |
R2-1915484 | Correction for random access initiation due to reconfiguration with sync | CR | Huawei, HiSilicon, Ericsson | 38.331 15.7.0 CR#1376 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
not pursued | [WTS] [JSN] |
R2-1915485 | Enhancement on BSR format for the one LCG case | CR | Huawei, HiSilicon | 38.321 15.7.0 CR#679 catF | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1915486 | Correction on header compression, integrity protection and ciphering | CR | Huawei, HiSilicon | 38.323 15.6.0 CR#37 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.3 |
not pursued | [WTS] [JSN] |
R2-1915487 | Correction on initial BWP bandwidth capabilities | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1377 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
withdrawn | [WTS] [JSN] |
R2-1915488 | Correction on camping conditions | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1378 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
agreed | [WTS] [JSN] |
R2-1915489 | Correction on CORESET location |
CR revised to R2-1916552 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1379 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
revised | [WTS] [JSN] |
R2-1915490 | On Autonomous Transmission of Pending MAC PDUs | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1915491 | Intra-UE Prioritization with Per-Grant Priority Indication: MAC Perspectives | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
noted | [WTS] [JSN] | |
R2-1915492 | Intra-UE Prioritization between SR and PUSCH | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.3 |
available | [WTS] [JSN] | |
R2-1915493 | Network Coordination for Uplink PDCP Duplication | discussion | Nokia, Nokia Shanghai Bell, LG Electronics, III, Spreadtrum, NTT Docomo, Fujitsu, Mediatek, CATT, Samsung, Asia Pacific Telecom | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
noted | [WTS] [JSN] | |
R2-1915494 | [Draft] LS on Network Coordination for UL PDCP Duplication |
LS out LS To: RAN3 revised to R2-1916544 |
Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
revised | [WTS] [JSN] | |
R2-1915495 | Configuration and Control for Uplink PDCP Duplication | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
noted | [WTS] [JSN] | |
R2-1915496 | On per-DRB DAPS Handover in NR and LTE |
discussion revision of R2-1913157 |
Nokia, Nokia Shanghai Bell | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1915497 | On RLF reporting for CHO and DAPS | discussion | Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | |
R2-1915498 | On when to decode and non-compliance with target cell configuration | discussion | Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
noted | [WTS] [JSN] | |
R2-1915499 | Failure Handling via CHO recovery | discussion | Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.2 |
noted | [WTS] [JSN] | |
R2-1915500 | DraftCR for early RLF and fast handover failure recovery for PSCell | draftCR | Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.4 |
available | [WTS] [JSN] | |
R2-1915501 | Remaining details of DAPS failure handling | discussion | Nokia, Nokia Shanghai Bell | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1915502 | DraftCR for introducing the fallback to source cell in DAPS handover failure | draftCR | Nokia, Nokia Shanghai Bell | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1915503 | On what is still possible for SL RLF detection | discussion | Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1915504 | Missing reportAddNeighMeas in periodic measurement reporting |
draftCR revision of R2-1913159 |
Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |
R2-1915505 | SMTC setting in MR-DC PSCell change |
CR revision of R2-1913979 revised to R2-1916473 |
Nokia, Nokia Shanghai Bell | 37.34 15.7.0 CR#1572 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1915506 | Clarifying the alignment of capability filtering across LTE and NR in MR-DC |
CR revision of R2-1914219 |
Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#12832 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5 |
agreed | [WTS] [JSN] |
R2-1915507 | Report for [107bis#36] [NR R15] FR2 CA Fallbacks (Nokia) |
discussion revised to R2-1916498 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
revised | [WTS] [JSN] | |
R2-1915508 | Report for [107bis#35] [NR R15] Consequences if not supported (Nokia) |
CR revision of R2-1913964 revised to R2-2000165 |
Nokia, Nokia Shanghai Bell | 38.306 15.7.0 CR#1762 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] |
R2-1915509 | On the capability coordination of measurement reporting criteria for MR-DC | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.3 |
noted | [WTS] [JSN] | |
R2-1915510 | Clarifying the interpretation behind the encapsulation of the filter extensions (Nokia) | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
noted | [WTS] [JSN] | |
R2-1915511 | On the modelling of dormant SCG | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1915512 | [DRAFT] Response LS on SL RLM_RLF |
LS out LS To: RAN1 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1915513 | Discussion on assistance information for resource allocation in NR SL | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915514 | Remaining issues on SL RLF reporting | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
noted | [WTS] [JSN] | |
R2-1915515 | Remaining issues on SL RLM | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1915516 | Discussion on groupcast HARQ in NR SL | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915517 | Discussion on measurement and report in NR SL | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915518 | Discussion on remaining issues of mode1 operation | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1915519 | CAPAC for UL configured grant with SRB data | discussion | ZTE Corporation, Sanechips |
R2-108 AI: 6.2.2.6 |
available | [WTS] [JSN] | |||
R2-1915520 | Further details on PDCCH WUS | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1915521 | Dedicated RRM Measurement Relaxation | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1915522 | Further details on RRM measurement relaxation | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1915523 | On UE assistance | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915524 | (IPA) Correction on inter-frequency neighbour cell measurements |
CR revision of R2-1913985 revised to R2-1916304 |
Ericsson | 36.3 15.7.0 CR#12522 catF | LTE_5GCN_connect-Core, LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1915525 | Correction to Pcompensation for FR2 |
CR revision of R2-1914169 |
Huawei, HiSilicon | 36.304 15.4.0 CR#777 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.5.1 |
withdrawn | [WTS] [JSN] |
R2-1915526 | Correction to nonCriticalExtension of RRCConnectionRelease | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4150 catF | LTE_5GCN_connect-Core, TEI15 | Rel-15 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1915527 | Report of email discussion [107bis#71][PowerSaving] 38.321 running CR | report | Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
noted | [WTS] [JSN] | |
R2-1915528 | Running CR for Introduction of Rel-16 NR UE power saving in TS 38.321 | draftCR | Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1915529 | On SrxlevRef adaptation in relaxed monitoring |
discussion revised to R2-2001063 |
Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1915530 | Reducing the number of neighbour cells/carriers to measure |
discussion revision of R2-1913569 revised to R2-2001064 |
Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1915531 | Remaining issues of DL quality report | discussion | Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-108 AI: 7.1.6 |
available | [WTS] [JSN] | |
R2-1915532 | DRAFT LS on channel quality report for LTE-MTC |
LS out LS is reply to R1-1911386 LS To: RAN1, RAN4 |
Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-108 AI: 7.1.6 |
available | [WTS] [JSN] | |
R2-1915533 | MPDCCH performance improvement using CRS | discussion | Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-108 AI: 7.1.7 |
noted | [WTS] [JSN] | |
R2-1915534 | ETWS/CMAS in connected mode | discussion | Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-108 AI: 7.1.8 |
noted | [WTS] [JSN] | |
R2-1915535 | DRAFT LS to RAN1 on the use of SI-RNTI for the ETWS/CMAS notification |
LS out LS To: RAN1 |
Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-108 AI: 7.1.8 |
noted | [WTS] [JSN] | |
R2-1915536 | Enhancements to idle mode mobility for non-BL UEs | discussion | Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-108 AI: 7.1.8 |
noted | [WTS] [JSN] | |
R2-1915537 | Use of RSS for measurement improvements | discussion | Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-108 AI: 7.1. |
available | [WTS] [JSN] | |
R2-1915538 | Way forward on pre-emptive BSR |
discussion revision of R2-1915258 |
Samsung, Lenovo, Nokia, Nokia Shanghai Bell, Huawei, Futurewei, LG, Sequans Communications, Intel, Kyocera, Qualcomm |
R2-108 AI: 6.1.4.1 |
noted | [WTS] [JSN] | |||
R2-1915539 | Considerations on the RRM measurement relaxation |
discussion revision of R2-1912691 |
PANASONIC R&D Center Germany |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |||
R2-1915540 | SI update notification and PWS notification in WUS |
discussion revision of R2-1912694 |
PANASONIC R&D Center Germany |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |||
R2-1915541 | Measurement reporting while CHO is configured |
discussion revision of R2-1912693 revised to R2-2000855 |
PANASONIC R&D Center Germany |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |||
R2-1915542 | CA duplication using NR PDCP in EN-DC | discussion | Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915543 | System Information in NTN |
discussion revision of R2-1912697 |
Nomor Research GmbH | Rel-16 |
R2-108 AI: 6.6.4.3 |
available | [WTS] [JSN] | ||
R2-1915544 | Remaining issues on consistent LBT failures |
discussion revision of R2-1913260 |
MediaTek Inc. | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |
R2-1915545 | Indicating SFN LSB in the payload of Msg2 or MsgB |
discussion revision of R2-1913261 |
MediaTek Inc. | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | |
R2-1915546 | Ethernet Header Compression Message Format |
discussion revision of R2-1913265 |
MediaTek Inc. | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |
R2-1915547 | Propagation Delay Compensation by the gNB |
discussion revision of R2-1913267 |
MediaTek Inc. | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |
R2-1915548 | Running CR for 38.331 for Power Savings |
draftCR revised to R2-2000843 |
MediaTek Inc. | FS_NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915549 | Open issues related to the running 38.331 CR | discussion | MediaTek Inc. | FS_NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.3 |
noted | [WTS] [JSN] | |
R2-1915550 | Periodic CSI and SRS with wake-up indication |
discussion revision of R2-1913259 |
MediaTek Inc. | FS_NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1915551 | On T312 in NR and its relationship with T310 | discussion | Nokia, Nokia Shanghai Bell | NR_Mob_enh | Rel-16 |
R2-108 AI: 6.9.3.4 |
available | [WTS] [JSN] | |
R2-1915552 | Resource Pool Sharing between Mode 1 and Mode 2 UEs |
discussion revision of R2-1912650 revised to R2-2000327 |
Fraunhofer HHI, Fraunhofer IIS |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |||
R2-1915553 | Further D-PUR configuration aspects |
discussion revision of R2-1903933 |
Gemalto N.V. |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R2-1915554 | PC5-RRC Procedures for NR V2X |
discussion revision of R2-1912652 |
Fraunhofer HHI, Fraunhofer IIS |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1915555 | Resource Allocation for Mode 2 NR V2X |
discussion revision of R2-1912651 |
Fraunhofer HHI, Fraunhofer IIS |
R2-108 AI: 6.4.4 |
available | [WTS] [JSN] | |||
R2-1915556 | UE capabilities for CHO |
discussion revision of R2-1913015 |
Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1915557 | UE capabilities for DAPS handover |
discussion revision of R2-1913016 |
Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1915558 | Stage 2 for Multi-RTT positioning | discussion | Qualcomm Incorporated |
R2-108 AI: 6.8.2.1 |
noted | [WTS] [JSN] | |||
R2-1915559 | Reconfiguration failure in NE-DC |
CR revision of R2-1913270 |
Google Inc. | 36.331 15.7.0 CR#41151 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5 |
agreed | [WTS] [JSN] |
R2-1915560 | Running LPP CR for PPP-RTK support (SSR) | discussion | Qualcomm Incorporated |
R2-108 AI: 6.8.2.2 |
endorsed | [WTS] [JSN] | |||
R2-1915561 | Running LTE RRC CR for PPP-RTK support (SSR) | discussion | Qualcomm Incorporated |
R2-108 AI: 6.8.2.2 |
endorsed | [WTS] [JSN] | |||
R2-1915562 | Remaining details on broadcast assistance data delivery | discussion | Qualcomm Incorporated |
R2-108 AI: 6.8.2.3.1 |
available | [WTS] [JSN] | |||
R2-1915563 | Assistance Data for DL-only UE-based mode | discussion | Qualcomm Incorporated |
R2-108 AI: 6.8.2.4 |
available | [WTS] [JSN] | |||
R2-1915564 | Details of pre-emptive BSR design | discussion | Samsung Electronics GmbH |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | |||
R2-1915565 | Further details on uplink enhancements for NTN | discussion | Ericsson | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1915566 | DRX adaptions for NTN |
discussion revised to R2-1916383 |
Ericsson, Nomor Research GmbH, THALES | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1915567 | Remaining details on Random access for NTN |
discussion revised to R2-1916388 |
Ericsson | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1915568 | On RACH less for NTN | discussion | Ericsson | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1915569 | Correction to full configuration |
CR revised to R2-1916311 |
Google Inc. | 36.331 15.7.0 CR#4151 catF | LTE_QMC_Streaming-Core | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1915570 | Summary of E-mail discusion [107bis#33][NR R15] Exchanging used IDs of SN terminated DRBs | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
noted | [WTS] [JSN] | |
R2-1915571 | LS on handover without SN configuration query |
LS out LS To: RAN3 revised to R2-1916599 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
revised | [WTS] [JSN] | |
R2-1915572 | Draft CR on not up-to-date SN terminated RB configuration | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
available | [WTS] [JSN] | |
R2-1915573 | Clarification on PDCP version change |
CR revised to R2-2001176 |
Huawei, HiSilicon | 36.331 15.7.0 CR#4152 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
not treated | [WTS] [JSN] |
R2-1915574 | Clarification on PDCP version change |
CR revised to R2-2001175 |
Huawei, HiSilicon | 37.34 15.7.0 CR#166 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
not treated | [WTS] [JSN] |
R2-1915575 | Correction to DRB addition/modification for the LTE UE not in EN-DC |
CR revised to R2-2001179 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1380 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1915576 | Clarification on sending of sk-counter for (NG)EN-DC | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4153 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1915577 | Correction to key derivation for the UE configured with sk-counter |
CR revised to R2-1916483 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1381 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
revised | [WTS] [JSN] |
R2-1915578 | Correction on the need for reconfiguration with sync in NR-DC |
CR revised to R2-2001177 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1382 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1915579 | Correction on the pre-condition for reconfiguration with sync of SCG |
CR revised to R2-1916484 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1383 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
revised | [WTS] [JSN] |
R2-1915580 | Correction on the SCG RRCReconfigurationComplete for NR-DC |
CR revised to R2-2001178 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1384 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1915581 | Correction on AS-Context | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4154 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
merged | [WTS] [JSN] |
R2-1915582 | Correction on AS-Config | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1385 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
agreed | [WTS] [JSN] |
R2-1915583 | Addition of servCellIndexRangeSCG in AS-Context in 36331 | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4155 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
not pursued | [WTS] [JSN] |
R2-1915584 | Addition of servCellIndexRangeSCG in AS-Context in 38331 | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1386 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
not treated | [WTS] [JSN] |
R2-1915585 | Clarification on the (NG)EN-DC capabilities | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4156 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
not pursued | [WTS] [JSN] |
R2-1915586 | Clarification on the en-DC and ng-EN-DC capabilities |
CR revised to R2-1916594 |
Huawei, HiSilicon | 36.306 15.6.0 CR#1720 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
revised | [WTS] [JSN] |
R2-1915587 | Clarification on ne-DC capability |
CR revised to R2-1916593 |
Huawei, HiSilicon | 38.306 15.7.0 CR#200 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
revised | [WTS] [JSN] |
R2-1915588 | PDCP configuration generation (email discussion of 107#25) |
CR revision of R2-1913273 revised to R2-1916560 |
Huawei, HiSilicon | 37.34 15.7.0 CR#1581 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1915589 | Correction for the establishment of LTE RLC bearers for (NG)EN-DC and NE-DC |
CR revision of R2-1914125 revised to R2-1916399 |
Huawei, HiSilicon | 37.34 15.7.0 CR#167 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
revised | [WTS] [JSN] |
R2-1915590 | Correction on measurement reporting in NR-DC | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1387 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R2-1915591 | PUCCH configuration for MR-DC and NR standalone | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
noted | [WTS] [JSN] | |
R2-1915592 | Correction on PUCCH configuration | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1388 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
postponed | [WTS] [JSN] |
R2-1915593 | Draft LS to RAN1 for clarification of PUCCH configuration |
LS out LS To: RAN1 revised to R2-1916477 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
revised | [WTS] [JSN] | |
R2-1915594 | Correction on SIB1 description |
CR revised to R2-1916491 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1389 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
revised | [WTS] [JSN] |
R2-1915595 | Enhancement of RRC_INACTIVE | discussion | Google Inc. |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |||
R2-1915596 | Consideration of preemptive BSR in IAB | discussion | Kyocera |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | |||
R2-1915597 | Further discussion on-demand SI for RRC_CONNECTED UE | discussion | Huawei, HiSilicon | Rel-16 |
R2-108 AI: 6.21 |
noted | [WTS] [JSN] | ||
R2-1915598 | Possible issues on Backhaul RLF handling | discussion | Kyocera |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |||
R2-1915599 | Hand-over rate in Earth fixed vs. Earth moving cells in NTN LEO | discussion | THALES | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | ||
R2-1915600 | Recovery due to LBT failures | discussion | Kyocera |
R2-108 AI: 6.2.3.2 |
available | [WTS] [JSN] | |||
R2-1915601 | PC5 L2/L3 protocols for unicast and groupcast | discussion | Kyocera |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1915602 | RA type switch and fallback in 2-step RA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1915603 | New msgB format for 2-step RA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1915604 | Preamble group handling for 2-step RA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.3 |
available | [WTS] [JSN] | |
R2-1915605 | CFRA in 2-step RA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1915606 | Beam-specific 2-step RA support | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.3 |
available | [WTS] [JSN] | |
R2-1915607 | msgB RNTI design for 2-step RA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1915608 | Introduction of additional enhancements for NB-IoT |
CR revision of R2-1914093 revised to R2-1916570 |
Qualcomm Incorporated | 38.3 15.7.0 CR#1761 catB | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
revised | [WTS] [JSN] |
R2-1915609 | Introduction of additional enhancements for eMTC |
CR revision of R2-1914037 revised to R2-1916363 |
Qualcomm Incorporated | 38.3 15.7.0 CR#1751 catB | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
revised | [WTS] [JSN] |
R2-1915610 | Proposals for WUS group open issues | discussion | Qualcomm Incorporated | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
noted | [WTS] [JSN] | |
R2-1915611 | Proposal for 2-bit downlink channel quality reporting in MSG3 for eMTC |
discussion revised to R2-1916267 |
Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.6 |
revised | [WTS] [JSN] | |
R2-1915612 | LTE-M indication discussion paper | discussion | Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.12 |
noted | [WTS] [JSN] | |
R2-1915613 | RNTI for ETWS/CMAS indication in connected mode for non-BL UEs | discussion | Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.8 |
noted | [WTS] [JSN] | |
R2-1915614 | [DRAFT] Reply LS on assistance indication for WUS |
LS out LS is reply to R2-1914346 LS To: SA2, CT1, RAN3 revised to R2-1916433 |
Qualcomm Incorporated | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.3 |
revised | [WTS] [JSN] | |
R2-1915615 | Remaining issues for EHC in TSC |
discussion revision of R2-1912901 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |
R2-1915616 | UE behaviour on Logged MDT configuration events | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915617 | Avoiding conflicting MDT configurations in DC | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915618 | Impact of SNPN on PLMN check for MDT |
discussion revision of R2-1913546 |
Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915619 | RACH report and its reporting procedure | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915620 | Scheduled IP Throughput configuration for NR MDT | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1915621 | Beam measurements linked to successful and failed handovers |
discussion revision of R2-1910716 |
Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
noted | [WTS] [JSN] | |
R2-1915622 | Measurement event for interference-forced inter-RAT/inter-freq HO |
discussion revision of R2-1913552 |
Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915623 | QoE measurements collection support in Rel-16 | discussion | Nokia, Nokia Shanghai Bell | LTE_QMC_Streaming | Rel-16 |
R2-108 AI: 7.5 |
noted | [WTS] [JSN] | |
R2-1915624 | Clarification on RA and Msg3 with PUSCH Enhancements |
CR revision of R2-1913981 revised to R2-1916301 |
Nokia, Nokia Shanghai Bell | 36.321 14.11.0 CR#14564 catF | LTE_VoLTE_ViLTE_enh | Rel-14 |
R2-108 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1915625 | Clarification on RA and Msg3 with PUSCH Enhancements |
CR revision of R2-1913982 revised to R2-1916302 |
Nokia, Nokia Shanghai Bell | 36.321 15.7.0 CR#14573 catA | LTE_VoLTE_ViLTE_enh | Rel-15 |
R2-108 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1915626 | Miscellaneous non-controversial corrections Set IV | CR | Ericsson | 38.331 15.7.0 CR#1390 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
withdrawn | [WTS] [JSN] |
R2-1915627 | Presence and absence of TAC in NR cell | CR | Ericsson | 38.331 15.7.0 CR#1391 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
withdrawn | [WTS] [JSN] |
R2-1915628 | Definition of NR standalone | CR | Ericsson | 38.331 15.7.0 CR#1392 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
withdrawn | [WTS] [JSN] |
R2-1915629 | Clarification on sCellIndex and SCell lists | CR | Ericsson, Nokia, Nokia Shanghai Bell, ZTE | 36.331 15.7.0 CR#4157 catF | LTE_CA_enh_b5C-Core, TEI15 | Rel-15 |
R2-108 AI: 4.5.1 |
withdrawn | [WTS] [JSN] |
R2-1915630 | Correction to channelBWs | CR | Ericsson | 38.306 15.7.0 CR#201 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
withdrawn | [WTS] [JSN] |
R2-1915631 | Rel-16 RRC planning | discussion | Ericsson | Rel-16 |
R2-108 AI: 6.19 |
withdrawn | [WTS] [JSN] | ||
R2-1915632 | Clarification of submission of RRCReconfigurationcomplete | CR | Ericsson | 38.331 15.7.0 CR#1393 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
withdrawn | [WTS] [JSN] |
R2-1915633 | Correction to early measurement reporting results | CR | Ericsson | 36.331 15.7.0 CR#4158 catF | LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5.1 |
withdrawn | [WTS] [JSN] |
R2-1915634 | Correction to maximum number of carriers for idle mode measurements | CR | Ericsson | 36.331 15.7.0 CR#4159 catF | LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5.1 |
withdrawn | [WTS] [JSN] |
R2-1915635 | Correction on reestablishRLC and reestablishPDCP | CR | Ericsson | 38.331 15.7.0 CR#1394 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
withdrawn | [WTS] [JSN] |
R2-1915636 | Ambiguities in channel bandwidth capabilities | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
withdrawn | [WTS] [JSN] | |
R2-1915637 | Full configuration in inter-RAT handover |
CR revision of R2-1913386 |
Google Inc. | 36.331 15.7.0 CR#41211 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.2 |
not treated | [WTS] [JSN] |
R2-1915638 | Formula for mapping UE to WUS group |
discussion revision of R2-1912907 revised to R2-2001210 |
ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | |
R2-1915639 | Configuration details for WUS grouping | discussion | ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | |
R2-1915640 | Unresolved issues for BFR on SCell | discussion | Ericsson | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1915641 | BFR MAC CE for SpCell | discussion | Ericsson | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1915642 | Addition of indication for successful Random access procedure |
CR revision of R2-1913014 |
Ericsson | 38.321 15.7.0 CR#6651 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1915643 | New BSR trigger for EN-DC |
discussion revision of R2-1913889 |
Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915644 | Introduction of Additional SRS |
CR revised to R2-2001079 |
Ericsson | 36.321 15.7.0 CR#1461 catB | LTE_DL_MIMO_EE-Core | Rel-16 |
R2-108 AI: 7.8 |
postponed | [WTS] [JSN] |
R2-1915645 | Draft LS on S-KgNB/KSN Derivation in Conditional PSCell Addition/Change |
LS out LS To: SA3 |
Futurewei | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1915646 | Use case and Signaling for RSS | discussion | Ericsson |
R2-108 AI: 7.1. |
available | [WTS] [JSN] | |||
R2-1915647 | New SIB for hosting posSI Scheduling Information | discussion | Ericsson |
R2-108 AI: 6.8.2.3.1 |
available | [WTS] [JSN] | |||
R2-1915648 | Quality Report in eMTC Remaining Issues | discussion | Ericsson |
R2-108 AI: 7.1.6 |
available | [WTS] [JSN] | |||
R2-1915649 | RSS Signalling Configuration | discussion | Ericsson |
R2-108 AI: 7.1. |
available | [WTS] [JSN] | |||
R2-1915650 | Remaining Issues for ANR measurements | discussion | Ericsson |
R2-108 AI: 7.2.6 |
available | [WTS] [JSN] | |||
R2-1915651 | Additional path reporting for downlink NR positioning measurements |
discussion revised to R2-1916487 |
Ericsson, T-Mobile, Nokia, Nokia Shanghai Bell, Deutsche Telekom |
R2-108 AI: 6.8.2.1 |
revised | [WTS] [JSN] | |||
R2-1915652 | LPP, RRC and UE Rx-Tx Aspects of NR RAT dependent positioning | discussion | Ericsson |
R2-108 AI: 6.8.2.1 |
noted | [WTS] [JSN] | |||
R2-1915653 | Corrections of terminology for stage 2 | CR | Ericsson | 38.305 15.4.0 CR#16 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.3 |
agreed | [WTS] [JSN] |
R2-1915654 | GNSS Integer Ambiguity Level Indications | discussion | Ericsson, Swift Navigation,ESA |
R2-108 AI: 6.8.2.2 |
noted | [WTS] [JSN] | |||
R2-1915655 | Corrections for Positioning Architecture |
CR revision of R2-1914072 |
Ericsson | 38.305 15.4.0 CR#152 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.3 |
agreed | [WTS] [JSN] |
R2-1915656 | On Demand Delivery of Positioning Assistance Data | discussion | Ericsson |
R2-108 AI: 6.8.2.3.2 |
available | [WTS] [JSN] | |||
R2-1915657 | Specify UDC Header is part of Data Field | CR | Ericsson, Samsung, Nokia, Nokia Shanghai Bell, Huawei, HiSilicon, CATT | 36.323 15.4.0 CR#277 catF | LTE_UDC-Core | Rel-15 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1915658 | UE-based configuration options | discussion | Ericsson |
R2-108 AI: 6.8.2.4 |
available | [WTS] [JSN] | |||
R2-1915659 | System support for NB-IoT Paging across Multiple Carriers | CR | VODAFONE Group Plc | 36.3 14.11.0 CR#1253 catF | NB_IOTenh-Core | Rel-14 |
R2-108 AI: 4.1 |
postponed | [WTS] [JSN] |
R2-1915660 | Miscellaneous non-controversial corrections Set IV | CR | Ericsson | 38.331 15.7.0 CR#1395 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
withdrawn | [WTS] [JSN] |
R2-1915661 | Presence and absence of TAC in NR cell | CR | Ericsson | 38.331 15.7.0 CR#1396 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
withdrawn | [WTS] [JSN] |
R2-1915662 | Definition of NR standalone | CR | Ericsson | 38.331 15.7.0 CR#1397 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
withdrawn | [WTS] [JSN] |
R2-1915663 | Clarification on sCellIndex and SCell lists |
CR revised to R2-1916308 |
Ericsson, Nokia, Nokia Shanghai Bell, ZTE | 36.331 15.7.0 CR#4160 catF | LTE_CA_enh_b5C-Core, TEI15 | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1915664 | Correction to channelBWs |
CR revised to R2-1916353 |
Ericsson | 38.306 15.7.0 CR#202 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1915665 | Rel-16 RRC planning | discussion | Ericsson | Rel-16 |
R2-108 AI: 6 |
endorsed | [WTS] [JSN] | ||
R2-1915666 | Clarification of submission of RRCReconfigurationcomplete | CR | Ericsson | 38.331 15.7.0 CR#1398 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1915667 | Correction to early measurement reporting results |
CR revised to R2-1916312 |
Ericsson | 36.331 15.7.0 CR#4161 catF | LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1915668 | Correction to maximum number of carriers for idle mode measurements | CR | Ericsson | 36.331 15.7.0 CR#4162 catF | LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5.1 |
not pursued | [WTS] [JSN] |
R2-1915669 | Correction on reestablishRLC and reestablishPDCP | CR | Ericsson | 38.331 15.7.0 CR#1399 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
merged | [WTS] [JSN] |
R2-1915670 | Ambiguities in channel bandwidth capabilities | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
noted | [WTS] [JSN] | |
R2-1915671 | Miscellaneous non-controversial corrections Set IV |
CR revision of R2-1913540 revised to R2-1916350 |
Ericsson | 38.331 15.7.0 CR#13231 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
revised | [WTS] [JSN] |
R2-1915672 | Presence and absence of TAC in NR cell |
CR revision of R2-1914127 |
Ericsson | 38.331 15.7.0 CR#13252 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1915673 | Definition of NR standalone |
CR revision of R2-1914139 revised to R2-1916488 |
Ericsson | 38.331 15.7.0 CR#13242 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
revised | [WTS] [JSN] |
R2-1915674 | CR to 36.306 - On explicit NR FR1 related CGI reporting capability indication | CR | Ericsson | 36.306 15.6.0 CR#1721 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1915675 | CR to 36.331 - On explicit NR FR1 related CGI reporting capability indication | CR | Ericsson | 36.331 15.7.0 CR#4163 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
not treated | [WTS] [JSN] |
R2-1915676 | CR to 38.306 - On NR CGI reporting related issues | CR | Ericsson | 38.306 15.7.0 CR#203 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
merged | [WTS] [JSN] |
R2-1915677 | CR to 38.331 - On NR CGI reporting related issues | CR | Ericsson | 38.331 15.7.0 CR#1400 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
not treated | [WTS] [JSN] |
R2-1915678 | System support for NB-IoT Paging across Multiple Carriers | CR | VODAFONE Group Plc | 36.3 15.7.0 CR#1254 catA | NB_IOTenh-Core | Rel-15 |
R2-108 AI: 4.1 |
not treated | [WTS] [JSN] |
R2-1915679 | Network control for non-BL UE in BR mode |
discussion revision of R2-1912908 |
ZTE Corporation, Sanechips | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.8 |
available | [WTS] [JSN] | |
R2-1915680 | Introducing multiple BC-FS | CR | Ericsson | 38.331 15.7.0 CR#1401 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915681 | Returning multiple BC+FS in CG-Config | discussion | Ericsson |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | |||
R2-1915682 | Correction to Feature Set Combination and Band combination list for NR-DC (38.331) |
CR revised to R2-1916523 |
Ericsson | 38.331 15.7.0 CR#1402 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
revised | [WTS] [JSN] |
R2-1915683 | Security requirements for split PDU session (38.331) |
CR revised to R2-1916486 |
Ericsson, Qualcomm | 38.331 15.7.0 CR#1403 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.8 |
revised | [WTS] [JSN] |
R2-1915684 | Use of splitSRB-WithOneUL-Path capability (38.306) |
CR revised to R2-1916502 |
Ericsson | 38.306 15.7.0 CR#204 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1915685 | Use of splitSRB-WithOneUL-Path capability (38.331) | CR | Ericsson | 38.331 15.7.0 CR#1404 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1915686 | Use of splitSRB-WithOneUL-Path capability | discussion | Ericsson |
R2-108 AI: 5.4.4 |
noted | [WTS] [JSN] | |||
R2-1915687 | Open issues for supended SCG behaviour | discussion | Ericsson |
R2-108 AI: 6.10.4.3 |
noted | [WTS] [JSN] | |||
R2-1915688 | Configuration of dormancy behaviour in SCell | discussion | Ericsson |
R2-108 AI: 6.10.4.2 |
noted | [WTS] [JSN] | |||
R2-1915689 | Correction to pdsch-RepetitionMultiSlots and pusch-RepetitionMultiSlots | CR | Ericsson | 38.306 15.7.0 CR#205 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1915690 | Running CR for the introduction of NR positioning |
draftCR revision of R2-1913412 |
Ericsson | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.1 |
available | [WTS] [JSN] | |
R2-1915691 | Remaining issues for accurate reference time delivery | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |
R2-1915692 | CG/SPS alignment with TSN periodicity | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |
R2-1915693 | Further discussion on CG periodicities and CG and SPS occasions determination for new periodicities | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | |
R2-1915694 | SPS collisions with multiple SPS configurations |
discussion revision of R2-1909491 |
Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |
R2-1915695 | Padding removal |
discussion revised to R2-1916248 |
Nokia, Nokia Shanghai Bell, vivo, OPPO, Mediatek, Samsung, Sony, Intel, ZTE | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.3 |
revised | [WTS] [JSN] | |
R2-1915696 | Joint IP and Ethernet Header compression | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |
R2-1915697 | Ethernet Header compression profiles | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |
R2-1915698 | Further details of feedback mechanism | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |
R2-1915699 | Route priority and local routing | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |
R2-1915700 | BH link failure handling | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |
R2-1915701 | Remaining issues of routing and bearer mapping configuration in IAB nodes for UP traffic | discussion | Nokia, Nokia Shanghai Bell, Ericsson, KDDI | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.2 |
noted | [WTS] [JSN] | |
R2-1915702 | Remaining issues of routing and bearer mapping configuration in IAB nodes for CP traffic | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.2 |
noted | [WTS] [JSN] | |
R2-1915703 | RAN2 aspects of F1AP over LTE signalling | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |
R2-1915704 | [DRAFT] LS on F1AP over LTE leg signalling for IAB |
LS out LS To: RAN3 revised to R2-1916540 |
Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
revised | [WTS] [JSN] | |
R2-1915705 | Routing ID design for uplink | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |
R2-1915706 | Remaining issues regarding UE assistance information | discussion | Samsung Telecommunications | NR_newRAT-Core |
R2-108 AI: 5.4.1.3.11 |
noted | [WTS] [JSN] | ||
R2-1915707 | Correction of UE assistance information |
CR revision of R2-1914161 revised to R2-1916489 |
Samsung Telecommunications | 38.331 15.7.0 CR#1405 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
revised | [WTS] [JSN] |
R2-1915708 | Correction of UE assistance information |
CR revision of R2-1913588 revised to R2-1916490 |
Samsung Telecommunications | 36.331 15.7.0 CR#4164 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
revised | [WTS] [JSN] |
R2-1915709 | Clarification regarding QoS handling in MRDC with 5G CN |
CR revision of R2-1913589 revised to R2-1916400 |
Samsung Telecommunications | 37.34 15.7.0 CR#168 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1915710 | Clarification regarding inter-node transfer of UE capability containers |
CR revised to R2-1916493 |
Samsung Telecommunications | 38.331 15.7.0 CR#1406 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
revised | [WTS] [JSN] |
R2-1915711 | Adding comment to avoid improper extension of per BC capabilities for MRDC | CR | Samsung Telecommunications | 38.331 15.7.0 CR#1407 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not pursued | [WTS] [JSN] |
R2-1915712 | Recommended Bit Rate/Query for FLUS and MTSI |
discussion revision of R2-1913598 |
Qualcomm Incorporated | E_FLUS | Rel-16 |
R2-108 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1915713 | [Draft] Reply LS on Recommended Bit Rate/Query for FLUS and MTSI |
LS out LS is reply to S4-191031 LS To: SA4 revised to R2-1916516 |
Qualcomm Incorporated | E_FLUS | Rel-16 |
R2-108 AI: 6.19 |
revised | [WTS] [JSN] | |
R2-1915714 | Too strong interference during CLI-RSSI measurement |
discussion revision of R2-1913393 |
Qualcomm Incorporated | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.2 |
available | [WTS] [JSN] | |
R2-1915715 | Report of [107bis#58]CLI measurements UE capabilities | discussion | Qualcomm Incorporated | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
noted | [WTS] [JSN] | |
R2-1915716 | Introduction of Cross Link Interference (CLI) handling and Remote Interference Management (RIM) |
draftCR revision of R2-1913535 revised to R2-2000441 |
Qualcomm Incorporated | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
endorsed | [WTS] [JSN] | |
R2-1915717 | Introduction of Rel-16 eMTC enhancements |
draftCR revision of R2-1914038 revised to R2-1916364 |
Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
revised | [WTS] [JSN] | |
R2-1915718 | Discussion on reply LS from SA2 on MT-EDT | discussion | Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core, 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.2 |
available | [WTS] [JSN] | |
R2-1915719 | [DRAFT] Reply LS on Mobile-terminated Early Data Transmission |
LS out LS is reply to S2-19108041 LS To: SA2 revised to R2-1916357 |
Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core, 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.2 |
revised | [WTS] [JSN] | |
R2-1915720 | MT-EDT related Editor's Notes and FFSes in RRC running CR | discussion | Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.1.2 |
available | [WTS] [JSN] | |
R2-1915721 | PUR related Editor's Notes and FFSes in RRC running CR | discussion | Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
noted | [WTS] [JSN] | |
R2-1915722 | Correction to field conditions in NE-DC |
CR revision of R2-1914124 |
Ericsson | 36.331 15.7.0 CR#41282 catF | NR_newRAT-Core, LTE_5GCN_connect-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1915723 | Hop-by-Hop Flow control for IAB |
discussion revision of R2-1913920 |
Futurewei Technologies |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | |||
R2-1915724 | SLRB configuration during UE state transition | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1915725 | Support of non-standardized PQI in NR V2X | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1915726 | Remaining aspects for SL RLC | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915727 | On the support of simultaneous configuration of mode1 and mode2 |
discussion revision of R2-1912791 |
Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |
R2-1915728 | Remaining aspects for SL PDCP |
discussion revision of R2-1912790 |
Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915729 | UE capabilities for features specified in R16 PWS WI | discussion | Intel Corporation | NR_UE_pow_sav | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1915730 | Remaining issues for early measurements upon UE mobility | discussion | Samsung Telecommunications | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
noted | [WTS] [JSN] | |
R2-1915731 | Resumption based on early measurement results | discussion | Samsung Telecommunications | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1915732 | Immediate MDT, inter-node aspects | discussion | Samsung Telecommunications | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915733 | Logged MDT, inter-node aspects (SN configuration) | discussion | Samsung Telecommunications | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915734 | MDT for early measurments (Logged, immediate) | discussion | Samsung Telecommunications | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915735 | Review of UE information in NR, alignment and harmonisation | discussion | Samsung Telecommunications | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.5 |
reserved | [WTS] [JSN] | |
R2-1915736 | CHO configuration/ execution, remaining aspects | discussion | Samsung Telecommunications | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1915737 | Main issues remaining for SN initiated SN change |
discussion revised to R2-1916273 |
Samsung Telecommunications | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
revised | [WTS] [JSN] | |
R2-1915738 | Capability coordination for DAPS, required UE capability details and signalling | discussion | Samsung Telecommunications | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1915739 | Further considerations on mobility for CAG | discussion | Intel Corporation | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1915740 | Configured grant confirmation MAC CE | discussion | Intel Corporation | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | |
R2-1915741 | TSC assistance information | discussion | Intel Corporation | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.3 |
available | [WTS] [JSN] | |
R2-1915742 | Intra UE prioritization of UL Data and Data | discussion | Intel Corporation | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |
R2-1915743 | RRC Connection establishment/resumption in SNPN and CAG | discussion | Intel Corporation | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.3 |
noted | [WTS] [JSN] | |
R2-1915744 | Benefits of inter-IAB node metric exchange for IAB scheduling | discussion | AT&T |
R2-108 AI: 6.1.4.1 |
noted | [WTS] [JSN] | |||
R2-1915745 | Remaining details of F1AP over LTE | discussion | AT&T, KDDI, LG, ZTE, Verizon, KT |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |||
R2-1915746 | CR to 36.331 for F1AP over LTE | discussion | AT&T, KDDI, LG, ZTE, Verizon, KT |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |||
R2-1915747 | CR to 38.331 for F1AP over LTE | discussion | AT&T, KDDI, LG, ZTE, Verizon, KT |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |||
R2-1915748 | UL BAP address and BAP path ID lengths | discussion | AT&T |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |||
R2-1915749 | Control of pre-emptive SR/BSR functionality for low-latency scheduling | discussion | AT&T |
R2-108 AI: 6.1.4.1 |
noted | [WTS] [JSN] | |||
R2-1915750 | Consideration of IAB features that may potentially require security enhancements | discussion | AT&T |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |||
R2-1915751 | Further Pre-configured UL Resources Design Considerations | discussion | Sierra Wireless, S.A. | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R2-1915752 | Report on Email discussion [107bis#84][NR MDT] MR DC related issue (Ericsson) | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915753 | Mobility history information reporting from the UE | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915754 | Logged MDT Configuration & Reporting handling in DC scenarios | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915755 | Leftover issues for Logged MDT in NR | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915756 | CR on introducing UE capability for MDT in NR | CR | Ericsson | 38.306 15.7.0 CR#206 catB | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
not treated | [WTS] [JSN] |
R2-1915757 | UE Location Report capability indication for MDT | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915758 | Maximum processing time for RRC Segmentation | discussion | Ericsson | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.3 |
available | [WTS] [JSN] | |
R2-1915759 | Remaining aspects on Capability ID | discussion | Ericsson | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.2 |
noted | [WTS] [JSN] | |
R2-1915760 | Introduction of RRC Segmentation - Downlink | CR | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, OPPO, KT, Turkcell, Verizon | 36.331 15.7.0 CR#4165 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915761 | Introduction of RRC Segmentation - Downlink | CR | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, OPPO, KT, Turkcell, Verizon | 36.306 15.6.0 CR#1722 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915762 | Segmentation in DL | discussion | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, Verizon, KT, Sprint, Charter Communications, CMCC, TurkCell, OPPO, Kyocera | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1915763 | Introduction of RRC Segmentation - Downlink | CR | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, OPPO, KT, Turkcell, Verizon | 38.331 15.7.0 CR#1408 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915764 | Introduction of RRC Segmentation - Downlink | CR | Ericsson, Deutsche Telekom, Vodafone, AT&T, Apple, Qualcomm Incorporated, OPPO, KT, Turkcell, Verizon | 38.306 15.7.0 CR#207 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1915765 | Remaining details of UL LBT failure mechanism | discussion | Qualcomm Incorporated |
R2-108 AI: 6.2.2.2 |
noted | [WTS] [JSN] | |||
R2-1915766 | Issue of loop topology after RLF | discussion | SHARP Corporation | Rel-16 |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | ||
R2-1915767 | Validity of CHO configurations based on security configuration |
discussion revision of R2-1913668 |
SHARP Corporation | Rel-16 |
R2-108 AI: 6.9.3.1 |
noted | [WTS] [JSN] | ||
R2-1915768 | RLC aspects of DAPS handover |
discussion revision of R2-1912357 |
Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |
R2-1915769 | Reception type for ETWS/CMAS for non-BL UE in CE in RRC_CONNECTED | draftCR | Ericsson | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.8 |
available | [WTS] [JSN] | |
R2-1915770 | Conditional measurement configuration for LEO NTN |
discussion revision of R2-1913603 |
InterDigital | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1915771 | Further considerations for the WUS | discussion | InterDigital | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1915772 | RRC release assistance for Control and User Plane CIoT EPS optimizations |
discussion revision of R2-1913757 |
Ericsson | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2. |
available | [WTS] [JSN] | |
R2-1915773 | Discussion on RLC bi-directional bearer setup for SL unicast | discussion | Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915774 | Discussion on remaining issues on HARQ process | discussion | Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915775 | Discussion on HARQ feedback for Sidelink Groupcast | discussion | Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915776 | Draft Reply LS on Sidelink HARQ Feedback for Groupcast |
LS out LS is reply to R2-1914350 LS To: SA2 |
Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915777 | UE Mobility for Simultaneous Mode 1 & Mode 2 configuration |
discussion revision of R2-1913498 |
Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |
R2-1915778 | Resource allocations for UEs with simultaneous mode 1 & mode 2 configurations |
discussion revision of R2-1913499 |
Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |
R2-1915779 | Discussion on SLRB configuration during state transition | discussion | Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1915780 | On-demand system information and dedicated signalling | discussion | MediaTek Inc., Ericsson | Rel-16 |
R2-108 AI: 6.8.2.3.2 |
available | [WTS] [JSN] | ||
R2-1915781 | Introduction of RACS [36.300] | draftCR | MediaTek Inc. | RACS-RAN-Core | Rel-15 |
R2-108 AI: 6.5.1 |
endorsed | [WTS] [JSN] | |
R2-1915782 | RRC release assistance for Control and User Plane CIoT EPS optimizations | draftCR | Ericsson | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2. |
withdrawn | [WTS] [JSN] | |
R2-1915783 | Further details on Backhaul link RLF Notification Types to Downstream Node(s) | discussion | Ericsson | Rel-16 |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | ||
R2-1915784 | Introduction of RACS [38.300] | draftCR | MediaTek Inc. | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.1 |
endorsed | [WTS] [JSN] | |
R2-1915785 | Processing time for segmented UE capability | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.5.3 |
noted | [WTS] [JSN] | ||
R2-1915786 | 2-step RA 38.331 Running CR | draftCR | Ericsson (Email disc rapporteur) | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.3 |
endorsed | [WTS] [JSN] | |
R2-1915787 | Report on email [107bis#77][2-step RACH] RRC details and running RRC CR (Ericsson) | discussion | Ericsson (Email disc rapporteur) | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.3 |
noted | [WTS] [JSN] | |
R2-1915788 | Report for email discussion [107bis#64][PRN] Suitable and acceptable NPN cells (Qualcomm) | report | Qualcomm Incorporated |
R2-108 AI: 6.18.2 |
noted | [WTS] [JSN] | |||
R2-1915789 | Introduction of UECapabilityInformation segmentation in 36.331 | draftCR | MediaTek Inc., CATT, Ericsson, Spreadtrum Communications, ZTE Corporation, Sanechips, OPPO, Qualcomm Incorporated | RACS-RAN-Core | Rel-16 |
R2-108 AI: 6.5.3 |
available | [WTS] [JSN] | |
R2-1915790 | Work plan for RACS-RAN work item | discussion | MediaTek Inc., CATT | Rel-16 |
R2-108 AI: 6.5.1 |
noted | [WTS] [JSN] | ||
R2-1915791 | Support (or not) of PC5-RRC for groupcast |
discussion revision of R2-1912813 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
noted | [WTS] [JSN] | |
R2-1915792 | Capturing RLM for NR sidelink in stage 2 | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | ||
R2-1915793 | RLM and state modelling based on PC5-S connection | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | ||
R2-1915794 | Early security re-activation | discussion | Ericsson, LG electronics Inc, Sierra Wireless, Qualcomm Inc | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
noted | [WTS] [JSN] | |
R2-1915795 | Early security re-activation at RRC Connection Resume - Alternative 1 | CR | Ericsson, LG Electronics Inc, Sierra Wireless, Qualcomm Inc | 36.331 15.7.0 CR#4166 catB | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
not treated | [WTS] [JSN] |
R2-1915796 | Early security re-activation at RRC Connection Resume - Alternative 2 |
CR revised to R2-2000987 |
Ericsson, LG Electronics, Sierra Wireless, Qualcomm Inc | 36.331 15.7.0 CR#4167 catB | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
not treated | [WTS] [JSN] |
R2-1915797 | Early security re-activation at RRC Connection Resume |
CR revised to R2-2000988 |
Ericsson, LG Electronics Inc, Sierra Wireless, Qualcomm Inc. | 36.306 15.6.0 CR#1723 catB | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
not treated | [WTS] [JSN] |
R2-1915798 | Asynchronous synchronisation reference sources | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | ||
R2-1915799 | Validity areas based on cell lists |
discussion revision of R2-1912820 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915800 | Running 38.304 CR for PRN | draftCR | Qualcomm Incorporated | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1915801 | Group WUS |
discussion revision of R2-1913776 revised to R2-2001472 |
Ericsson | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | |
R2-1915802 | Adapting the BFD mechanism for consistent LBT failure detection | discussion | Google Inc. | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | ||
R2-1915803 | CAPC for configured grants in NR-U |
discussion revision of R2-1913480 |
Google Inc. | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.6 |
available | [WTS] [JSN] | |
R2-1915804 | Draft Reply LS on Sending CAG ID in NAS layer |
LS out source LS: S3-193142 LS To: SA3, SA2, RAN3 revised to R2-1916346 |
Qualcomm Incorporated |
R2-108 AI: 6.18.3 |
revised | [WTS] [JSN] | |||
R2-1915805 | Support for NPN HRNN broadcast |
discussion revision of R2-1913635 |
Qualcomm Incorporated |
R2-108 AI: 6.18.4 |
available | [WTS] [JSN] | |||
R2-1915806 | System support for Wake Up Signal | CR | VODAFONE Group Plc | 36.3 15.7.0 CR#1255 catF | LTE_eMTC4-Core, NB_IOTenh2-Core | Rel-15 |
R2-108 AI: 4.1 |
not treated | [WTS] [JSN] |
R2-1915807 | Views on cell reselection for CAGs | discussion | Qualcomm Incorporated |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |||
R2-1915808 | Extended MAC CE ID |
discussion revision of R2-1913647 |
Qualcomm Incorporated |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |||
R2-1915809 | RoHC and EHC configuration on same PDCP entity | discussion | Qualcomm Incorporated |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |||
R2-1915810 | Draft LS on need for Ethernet padding compression |
LS out LS To: SA1 revised to R2-1916547 |
Qualcomm Incorporated | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.3 |
revised | [WTS] [JSN] | |
R2-1915811 | Views on handling of PDUs and data of deprioritized grants |
discussion revision of R2-1913641 |
Qualcomm Incorporated |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |||
R2-1915812 | Discussion of RAN1 LS on propagation delay compensation and way forward |
discussion revision of R2-1913645 |
Qualcomm Incorporated |
R2-108 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |||
R2-1915813 | Feedback Frame Format for EHC and CIoT link | discussion | Qualcomm Incorporated |
R2-108 AI: 6.7.2.3 |
noted | [WTS] [JSN] | |||
R2-1915814 | More granularity for PDCP discardTimer | discussion | Qualcomm Incorporated, Ericsson |
R2-108 AI: 6.7.2.2.3 |
available | [WTS] [JSN] | |||
R2-1915815 | PDCP duplication enhancements and RLC AM |
discussion revision of R2-1913640 |
Qualcomm Incorporated |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |||
R2-1915816 | Discussion on multiple configured grants | discussion | OPPO | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1915817 | Views on UE autonomous transmission using CG | discussion | Qualcomm Incorporated |
R2-108 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |||
R2-1915818 | MAC CE structure for PDCP duplication enhancement |
discussion revision of R2-1913638 |
Qualcomm Incorporated |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |||
R2-1915819 | Coexistence of measurement relaxation and early measurements | discussion | LG Electronics, Ericsson, MediaTek | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1915820 | RRM measurement relaxation based on measurement results | discussion | LG Electronics | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |
R2-1915821 | Considerations on validity area in NR | discussion | LG Electronics | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1915822 | Handling early measurement results upon cell reselection | discussion | LG Electronics | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1915823 | Remaining issues on early measurement configuration | discussion | LG Electronics | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | |
R2-1915824 | Cell identification information in NTN | discussion | LG Electronics | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.3 |
available | [WTS] [JSN] | |
R2-1915825 | Left issue on LCP for NR V2X | discussion | OPPO | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915826 | Left issues on SR and BSR | discussion | OPPO | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1915827 | Views on SPS collisions and some CG issues | discussion | Qualcomm Incorporated |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |||
R2-1915828 | Simultaneous use of mode 1 and mode 2 |
discussion revision of R2-1913943 |
KT Corp. |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |||
R2-1915829 | Open issues on system information | discussion | OPPO | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.7 |
available | [WTS] [JSN] | |
R2-1915830 | MAC prioritization for Intra-UE prioritization | discussion | Qualcomm Incorporated |
R2-108 AI: 6.7.3.2 |
noted | [WTS] [JSN] | |||
R2-1915831 | Value of UE-based PDCP duplication |
discussion revision of R2-1913639 |
Qualcomm Incorporated |
R2-108 AI: 6.7.4.2 |
available | [WTS] [JSN] | |||
R2-1915832 | Clarification on candidate NR frequencies for IDC in EN-DC |
CR revised to R2-2000682 |
NTT DOCOMO, INC. | 36.331 15.7.0 CR#4168 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.2 |
postponed | [WTS] [JSN] |
R2-1915833 | Discussion on Scell handling for CA | discussion | Huawei, HiSilicon | LTE_CA_enh_b5C-Core | Rel-13 |
R2-108 AI: 4.5.1 |
available | [WTS] [JSN] | |
R2-1915834 | Correction on Scell handling for CA | CR | Huawei, HiSilicon | 36.331 13.14.0 CR#4169 catC | LTE_CA_enh_b5C-Core | Rel-13 |
R2-108 AI: 4.5.1 |
not treated | [WTS] [JSN] |
R2-1915835 | Correction on Scell handling for CA | CR | Huawei, HiSilicon | 36.331 14.12.0 CR#4170 catA | LTE_CA_enh_b5C-Core | Rel-14 |
R2-108 AI: 4.5.1 |
not treated | [WTS] [JSN] |
R2-1915836 | Correction on Scell handling for CA | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4171 catA | LTE_CA_enh_b5C-Core | Rel-15 |
R2-108 AI: 4.5.1 |
not treated | [WTS] [JSN] |
R2-1915837 | Correction to the handling of stored AS context upon CN type change |
CR revision of R2-1913986 |
Huawei, HiSilicon | 36.304 15.4.0 CR#7722 catF | TEI15 | Rel-15 |
R2-108 AI: 4.5.1 |
merged | [WTS] [JSN] |
R2-1915838 | Correction on RRC_INACTIVE state |
CR revised to R2-1916309 |
Huawei, HiSilicon | 36.304 15.4.0 CR#775 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1915839 | Discussion on segment number for CMAS notification | discussion | Huawei, HiSilicon | TEI15 | Rel-15 |
R2-108 AI: 4.5.1 |
noted | [WTS] [JSN] | |
R2-1915840 | Technical considerations on new QMC requirements from SA5 |
discussion revision of R2-1912763 |
Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 7.5 |
noted | [WTS] [JSN] | |
R2-1915841 | Discussion on potential impacts to other WGs due to new QMC requirements from SA5 | discussion | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 7.5 |
available | [WTS] [JSN] | |
R2-1915842 | Report of email discussion 107b-51 | discussion | Huawei | LTE_5GCN_connect-Core, TEI16 | Rel-16 |
R2-108 AI: 7.6 |
noted | [WTS] [JSN] | |
R2-1915843 | Correction on non-3GPP paging |
CR revised to R2-1916316 |
Huawei, HiSilicon | 36.331 15.7.0 CR#4172 catB | LTE_5GCN_connect-Core, TEI16 | Rel-16 |
R2-108 AI: 7.6 |
revised | [WTS] [JSN] |
R2-1915844 | Discussion on configuration aspect for CHO |
discussion revision of R2-1912739 revised to R2-2001384 |
Huawei, HiSilicon, China Telecom | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1915845 | Discussion on execution aspect for CHO |
discussion revision of R2-1912740 |
Huawei, HiSilicon | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1915846 | Discussion on combination of simultaneous connectivity and CHO |
discussion revision of R2-1912743 revised to R2-2001386 |
Huawei, HiSilicon | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-108 AI: 6.9.3.3 |
available | [WTS] [JSN] | |
R2-1915847 | Discussion on MN initiated conditional PScell change | discussion | Huawei, HiSilicon | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1915848 | Discussion on conditional PScell change | discussion | Huawei, HiSilicon | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1915849 | Draft LS to RAN3 on conditional Pscell addition/change |
LS out LS To: RAN3 |
Huawei, HiSilicon | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1915850 | Report of email discussion [107bis#83] MDT | discussion | Huawei | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915851 | Running 38.331 CR for introducing MDT | draftCR | Huawei, Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
endorsed | [WTS] [JSN] | |
R2-1915852 | Discussion on open issues for running 38.331 CR for MDT | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915853 | Discussion on logging NR neighbour cell measurements for LTE MDT and SON | discussion | Huawei, HiSilicon, CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915854 | Introduction of NR neighbour cell measurements for LTE MDT and SON | draftCR | Huawei, HiSilicon, CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915855 | Discussion on remaining aspects on logged MDT and Accessibility measurements in NR |
discussion revised to R2-2001366 |
Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915856 | Discussion on remaining aspects on immediate MDT in NR |
discussion revised to R2-2001373 |
Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
postponed | [WTS] [JSN] | |
R2-1915857 | Discussion on remaining aspects on MDT and mobility history information in MR-DC | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | |
R2-1915858 | Discussion on delay measurement and collection | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1915859 | Discussion on SA5 defined measurements for the immediate MDT | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1915860 | Discussion on the throughput measurements in MR-DC | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1915861 | Discussion on remaining aspects on SON | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1915862 | Remaining issues in PDCP duplication | discussion | LG Electronics Inc. | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1915863 | Handling of DRB integrity verification failure | discussion | LG Electronics Inc. | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915864 | Handling of EHC protocol at PDCP re-establishment | discussion | LG Electronics Inc. | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |
R2-1915865 | Latency reduction enhancements for SCG RACH procedure |
discussion revision of R2-1913161 |
Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.4 |
available | [WTS] [JSN] | |
R2-1915866 | Enhancements to PUCCH-UCI and PHR | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.7 |
noted | [WTS] [JSN] | |
R2-1915867 | Remaining issues on Configured Grant | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.5 |
noted | [WTS] [JSN] | |
R2-1915868 | Channel access priority for Configured Grant | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.6 |
available | [WTS] [JSN] | |
R2-1915869 | DRX enhancement for NR-U | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.4 |
available | [WTS] [JSN] | |
R2-1915870 | Handling consistent UL LBT failures | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |
R2-1915871 | RACH enhancements for NR-U | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |
R2-1915872 | 2-step Random Access for NR-U | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.3 |
available | [WTS] [JSN] | |
R2-1915873 | Running MAC CR for NR-U | draftCR | Ericsson | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R2-1915874 | Rapporteur input on Running MAC CR for NR-U | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.1 |
noted | [WTS] [JSN] | |
R2-1915875 | Introduction of wideband PRG size | CR | Huawei, HiSilicon | 36.306 15.6.0 CR#1724 catB | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
postponed | [WTS] [JSN] |
R2-1915876 | Introduction of wideband PRG size | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4173 catB | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
postponed | [WTS] [JSN] |
R2-1915877 | UDC reconfiguration for RRC connection re-establishment case | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4174 catC | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
postponed | [WTS] [JSN] |
R2-1915878 | Discussion on DL MIMO efficiency enhancement | discussion | Huawei, HiSilicon | LTE_DL_MIMO_EE-Core | Rel-16 |
R2-108 AI: 7.8 |
noted | [WTS] [JSN] | |
R2-1915879 | Introduction of DL MIMO efficiency enhancement |
CR revised to R2-1916317 |
Huawei, HiSilicon | 36.306 15.6.0 CR#1725 catB | LTE_DL_MIMO_EE-Core | Rel-16 |
R2-108 AI: 7.8 |
revised | [WTS] [JSN] |
R2-1915880 | Introduction of DL MIMO efficiency enhancement |
CR revised to R2-1916318 |
Huawei, HiSilicon | 36.331 15.7.0 CR#4175 catB | LTE_DL_MIMO_EE-Core | Rel-16 |
R2-108 AI: 7.8 |
revised | [WTS] [JSN] |
R2-1915881 | Introduction of cross link interfernce management |
CR revised to R2-1916331 |
Huawei, HiSilicon | 38.3 15.7.0 CR#180 catB | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.1 |
revised | [WTS] [JSN] |
R2-1915882 | Introduction of cross link interfernce management | discussion | Huawei, HiSilicon | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.2 |
available | [WTS] [JSN] | |
R2-1915883 | Improvements for non-BL UEs camping in CE Mode | discussion | Apple (UK) Limited | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.8 |
noted | [WTS] [JSN] | |
R2-1915884 | Missing RACH aspect for DC |
CR revised to R2-1916413 |
Nokia, Nokia Shanghai Bell, ZTE Corporation (Rapporteur) | 37.34 15.7.0 CR#169 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1915885 | UL LBT failure detection | discussion | Nokia, Nokia Shanghai Bell, InterDigital, MediaTek, OPPO | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
noted | [WTS] [JSN] | |
R2-1915886 | UL LBT failure report | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |
R2-1915887 | Multiple configured grants for NR-U | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.5 |
noted | [WTS] [JSN] | |
R2-1915888 | LCP restriction for SRBs | discussion | Nokia, Nokia Shanghai Bell, Futurewei, Interdigital, Huawei, HiSilicon, MediaTek, Lenovo | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.6 |
noted | [WTS] [JSN] | |
R2-1915889 | Stage-2 running CR for 2-step RACH | draftCR | Nokia (rapporteur), Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.1 |
endorsed | [WTS] [JSN] | |
R2-1915890 | Clarification for aggregated bandwidth for overheating |
CR revision of R2-1914140 |
Huawei, HiSilicon, Ericsson | 38.331 15.7.0 CR#13352 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
agreed | [WTS] [JSN] |
R2-1915891 | Clarification on the feature set report in EUTRAN |
CR revision of R2-1913687 |
Huawei, HiSilicon | 38.331 15.7.0 CR#13371 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1915892 | CR on BWCS for inter-ENDC BC with intra-ENDC BC (38.331) |
CR revised to R2-2001318 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1409 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] |
R2-1915893 | CR on BWCS for inter-ENDC BC with intra-ENDC BC (38.306) |
CR revised to R2-2001319 |
Huawei, HiSilicon | 38.306 15.7.0 CR#208 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] |
R2-1915894 | On the RAN2 signalling support for new introduced channel bandwidth | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
available | [WTS] [JSN] | |
R2-1915895 | CR to 38.331 on support of 70MHz channel bandwidth -option1 with IODT bit |
CR revised to R2-1916500 |
Huawei, HiSilicon, Vodafone | 38.331 15.7.0 CR#1410 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1915896 | CR to 38.306 on support of 70MHz channel bandwidth -option1 with IODT bit |
CR revised to R2-1916501 |
Huawei, HiSilicon, Vodafone | 38.306 15.7.0 CR#209 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1915897 | CR to 38.331 on support of 70MHz channel bandwidth -option2 | CR | Huawei, HiSilicon, Vodafone | 38.331 15.7.0 CR#1411 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1915898 | CR to 38.306 on support of 70MHz channel bandwidth -option2 | CR | Huawei, HiSilicon, Vodafone | 38.306 15.7.0 CR#210 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1915899 | On the capability of EN-DC power class | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] | |
R2-1915900 | CR to clarify the power class for EN-DC | CR | Huawei, HiSilicon | 38.306 15.7.0 CR#211 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] |
R2-1915901 | Forward compatibility discussion on channel bandwidths parameter | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
available | [WTS] [JSN] | |
R2-1915902 | CR on forward compatibility for channel bandwidths parameter | CR | Huawei, HiSilicon | 38.306 15.7.0 CR#212 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1915903 | CR on CSI UE capabilities parameters (38.331) |
CR revised to R2-2001316 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1412 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] |
R2-1915904 | CR on CSI UE capabilities parameters (38.306) |
CR revised to R2-2001317 |
Huawei, HiSilicon | 38.306 15.7.0 CR#213 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] |
R2-1915905 | Corrections on PDCCH blind decoding in NR-DC |
CR revision of R2-1913688 |
Huawei, HiSilicon | 38.306 15.7.0 CR#1911 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
agreed | [WTS] [JSN] |
R2-1915906 | Discussion on performing ROHC and EHC | discussion | LG Electronics Inc. | NR_IIOT-Core |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | ||
R2-1915907 | Discussion on EHC feedback | discussion | LG Electronics Inc. | NR_IIOT-Core |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | ||
R2-1915908 | Dicussion on padding removal | discussion | LG Electronics Inc. | NR_IIOT-Core |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | ||
R2-1915909 | When to apply the target network configurations | discussion | LG Electronics Inc. | NR_Mob_enh-Core |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | ||
R2-1915910 | Need of discard indication | discussion | LG Electronics Inc. | NR_Mob_enh-Core |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | ||
R2-1915911 | Need of PDCP status report | discussion | LG Electronics Inc. | NR_Mob_enh-Core |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | ||
R2-1915912 | Discussion on DAPS HO for UM DRB | discussion | LG Electronics Inc. | NR_Mob_enh-Core |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | ||
R2-1915913 | Scheduling enhancement in NTN |
discussion revision of R2-1904730 |
LG Electronics Inc. | FS_NR_NTN_solutions |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | ||
R2-1915914 | Extension of the LCID |
discussion revision of R2-1913846 |
LG Electronics Inc. | TEI16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | ||
R2-1915915 | Considerations on failure handling for CPAC in NR | discussion | Potevio | NR_Mob_enh-Core |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | ||
R2-1915916 | Deprioritized PDU Retransmission Schemes | discussion | Apple (UK) Limited | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1915917 | Contents of a new CG confirmation MAC CE for multiple CG configurations | discussion | LG Electronics Inc. | NR_IIOT-Core |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | ||
R2-1915918 | Remaining issues in intra-UE prioritization | discussion | LG Electronics Inc. | NR_IIOT-Core |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | ||
R2-1915919 | Measurement gap skipping for TSN traffic |
discussion revision of R2-1913135 revised to R2-2001566 |
LG Electronics Inc. | NR_IIOT-Core |
R2-108 AI: 6.7.3.4 |
available | [WTS] [JSN] | ||
R2-1915920 | Additional opportunity for Msg1 in 4-step RACH |
discussion revision of R2-1913129 revised to R2-2001449 |
LG Electronics Inc. | NR_unlic-Core |
R2-108 AI: 6.2.2.1 |
available | [WTS] [JSN] | ||
R2-1915921 | Dynamic DL opportunity enhancement based on channel busy level in NR-U |
discussion revision of R2-1913131 revised to R2-2001450 |
LG Electronics Inc. | NR_unlic-Core |
R2-108 AI: 6.2.2.7 |
available | [WTS] [JSN] | ||
R2-1915922 | Discussion on SCell BFR procedure | discussion | LG Electronics Inc. | NR_eMIMO-Core |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | ||
R2-1915923 | Enhancements of SR cancellation for URLLC traffic |
discussion revised to R2-2001567 |
LG Electronics Inc. | NR_L1enh_URLLC-Core |
R2-108 AI: 6.22.2 |
available | [WTS] [JSN] | ||
R2-1915924 | Open Issues on PDCCH-WUS Mechanism |
discussion revised to R2-2000584 |
Apple | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1915925 | UE Assistance Information for CDRX Configuration | discussion | Apple | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915926 | UE Assistance Information for SCell Configuration |
discussion revised to R2-2000596 |
Apple | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915927 | UE Assistance Information for MR-DC | discussion | Apple | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1915928 | RAN1 Impact on MsgB Design | discussion | Apple | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1915929 | 2-Step CFRA | discussion | Apple | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1915930 | Further Detail on CHO Release | discussion | Apple | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1915931 | DAPS HO UP | discussion | Apple | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.2 |
withdrawn | [WTS] [JSN] | |
R2-1915932 | DRB specific DAPS HO | discussion | Apple | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1915933 | SCG Suspension | discussion | Apple | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1915934 | SCell BFR Operation |
discussion revised to R2-2000587 |
Apple | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1915935 | PCell BFR Operation | discussion | Apple | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1915936 | Positioning SIB Acquisition in Connected Mode | discussion | Apple | TEI16 | Rel-16 |
R2-108 AI: 6.8.2.3.2 |
available | [WTS] [JSN] | |
R2-1915937 | Preamble Selection for RACH Procedure |
discussion revised to R2-2000594 |
Apple | NR_newRAT-Core | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1915938 | Sidelink and Uplink Prioritization in cross-RAT | discussion | Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915939 | Layer2 ID and cast type in SL MAC header |
discussion revised to R2-2001337 |
Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915940 | Discussion on V2X specific validity area |
discussion revision of R2-1912630 revised to R2-2001334 |
Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.4 |
available | [WTS] [JSN] | |
R2-1915941 | TX profile for selected sidelink RAT |
discussion revised to R2-2001335, R2-2003675 |
Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1915942 | Some remaining issues on the UE assistance information | discussion | Xiaomi Communications |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |||
R2-1915943 | Remaining Issues for PDCP Duplication Enhancements for IIOT | discussion | Apple (UK) Limited | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | ||
R2-1915944 | Discussion on Configuration of MCG Fast Recovery | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.5 |
available | [WTS] [JSN] | |
R2-1915945 | DRX enhancement for NR-U |
discussion revision of R2-1912396 |
Xiaomi Communications | Rel-16 |
R2-108 AI: 6.2.2.4 |
available | [WTS] [JSN] | ||
R2-1915946 | UE based PDCP Duplication Enhancement | discussion | Apple (UK) Limited |
R2-108 AI: 6.7.4.2 |
available | [WTS] [JSN] | |||
R2-1915947 | Discussion on MT EDT support for 5G CIoT | discussion | LG Electronics UK | Rel-16 |
R2-108 AI: 7.1.2 |
available | [WTS] [JSN] | ||
R2-1915948 | RRC message for UP CIoT 5GS Optimisation | discussion | LG Electronics UK | Rel-16 |
R2-108 AI: 7.1.12 |
available | [WTS] [JSN] | ||
R2-1915949 | Report of Email discussion [106#65][R16 eMTC] UE identifier pros and cons | discussion | LG Electronics UK | Rel-16 |
R2-108 AI: 7.1.12 |
noted | [WTS] [JSN] | ||
R2-1915950 | Draft LS on UE Identifier in UP CIoT 5GS Optimisation |
LS out LS To: RAN3 |
LG Electronics UK | Rel-16 |
R2-108 AI: 7.1.12 |
available | [WTS] [JSN] | ||
R2-1915951 | Discussion on D-PUR request and TA validity check |
discussion revision of R2-1913682 revised to R2-2001397 |
LG Electronics UK | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R2-1915952 | Paging response usign D-PUR |
discussion revision of R2-1913683 revised to R2-2001398 |
LG Electronics UK | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R2-1915953 | Support for S-PUR |
discussion revision of R2-1913684 |
LG Electronics UK | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R2-1915954 | Consideration on the report of BWP information and on demand request failure information | discussion | Beijing Xiaomi Mobile Software | Rel-16 |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | ||
R2-1915955 | UE Radio Capabilities Segmentation Remaining Issues | discussion | Apple (UK) Limited | Rel-16 |
R2-108 AI: 6.5.3 |
available | [WTS] [JSN] | ||
R2-1915956 | Consideration on SR transmission colliding with PUSCH transmission |
discussion revision of R2-1912398 revised to R2-2000154, R2-2000172, R2-2000173 |
Xiaomi Communications | Rel-16 |
R2-108 AI: 6.2.2.7 |
available | [WTS] [JSN] | ||
R2-1915957 | General considerations on idle and inactive mode for NPN | discussion | Huawei, HiSilicon | NG_RAN_PRN | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1915958 | General considerations on connected mode for NPN | discussion | Huawei, HiSilicon | NG_RAN_PRN | Rel-16 |
R2-108 AI: 6.18.3 |
available | [WTS] [JSN] | |
R2-1915959 | Considerations on SI Validity Checking | discussion | Huawei, HiSilicon | NG_RAN_PRN | Rel-16 |
R2-108 AI: 6.18.4 |
available | [WTS] [JSN] | |
R2-1915960 | DRAFT LS to SA3 on Conditional PSCell addition/change |
LS out LS To: SA3 |
CATT | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1915961 | DRAFT LS to RAN3 on Conditional PSCell addition/change |
LS out LS To: RAN3 |
CATT | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1915962 | Report on Email Discussion [107b#52][NR MobE] Open issues Conditional PSCell addition/change |
discussion revised to R2-1916300 |
CATT | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
revised | [WTS] [JSN] | |
R2-1915963 | Further details of CHO configuration and execution | discussion | China Telecom |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |||
R2-1915964 | Remaining issues on accurate reference timing delivery | discussion | NTTDOCOMO, INC | NR_IIOT-Core |
R2-108 AI: 6.7.2.1 |
available | [WTS] [JSN] | ||
R2-1915965 | Handling of releasing source stacks for DAPS | discussion | China Telecommunications |
R2-108 AI: 7.3.2.1.1 |
available | [WTS] [JSN] | |||
R2-1915966 | Discussion on Sidelink Configured Grant support | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |||
R2-1915967 | Discussion on remaining issues of SR and BSR for SL Mode 1 |
discussion revised to R2-2001414 |
Huawei, HiSilicon |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |||
R2-1915968 | Discussion on HARQ support for NR sidelink | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
R2-1915969 | Remaining issues on NR SL and NR UL prioritization | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1915970 | Further discussion on SLRB configuration via SIB | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.6 |
noted | [WTS] [JSN] | |||
R2-1915971 | Remaining issues on cell reselection | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1915972 | SLRB configurations handling during UE state transition | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.6 |
noted | [WTS] [JSN] | |||
R2-1915973 | Further details of Uu RRC procedures for NR sidelink | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1915974 | Discussion on related aspects of system information | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |||
R2-1915975 | On potential RAN2 impacts related to security design for NR SL | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |||
R2-1915976 | [Draft] LS on potential RAN2 impacts related to NR SL security design |
LS out LS is reply to S3-193802 source LS: S3-193802 LS To: SA3 |
Huawei | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | ||
R2-1915977 | Discussion on the NR sidelink failure cases | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1915978 | Discussion about mode coexistence for NR sidelink | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |||
R2-1915979 | Running CR to 36.331 for NR V2X | draftCR | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-15 |
R2-108 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1915980 | TP on NR-V2X for TR 37.985 - RAN2 parts | pCR | Huawei, HiSilicon | 37.985 0.2.0 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
endorsed | [WTS] [JSN] |
R2-1915981 | Summary of email discussion [107bis#96][V2X] RLC AM mismatch | discussion | Huawei (Rapporteur) |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
R2-1915982 | Summary of email discussion [107bis#91][V2X] - Miscellaneous RRC issues for 5G V2X with NR Sidelink | discussion | Huawei (Rapporteur) |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |||
R2-1915983 | Running CR to TS 38.331 for 5G V2X with NR sidelink | draftCR | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-15 |
R2-108 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1915984 | Discussion on Sidelink L3 RSRP and CSI reporting in NR SL | discussion | Huawei, HiSilicon |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1915985 | Draft Stage-2 CR for Conditional PSCell Addition/Change | draftCR | CATT | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1915986 | Running CR to Introduce NR MDT for RAN Data Collection and Utilization | draftCR | CMCC, Nokia, Nokia Shanghai Bell (Rapporteur) | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
endorsed | [WTS] [JSN] | |
R2-1915987 | Leftovers for TS 37.320 to support NR MDT | discussion | CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1915988 | [DRAFT] LS on Logged Measurements |
LS out LS To: RAN4 revised to R2-1916418 |
CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
revised | [WTS] [JSN] | |
R2-1915989 | Cell selection and reselection for NPN | discussion | CMCC | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |
R2-1915990 | Access and mobility control for NPN | discussion | CMCC | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.4 |
available | [WTS] [JSN] | |
R2-1915991 | CAG ID transmission during both initial access and resume | discussion | CMCC | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.3 |
available | [WTS] [JSN] | |
R2-1915992 | Draft Reply LS on CAG ID Transmission |
LS out LS is reply to SA3,CT1 source LS: C1-195157 LS To: SA2 |
CMCC | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.3 |
available | [WTS] [JSN] | |
R2-1915993 | Approaches comparison of supporting TSN periodicities of non-integer CG-SPS periodicities | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |
R2-1915994 | Supported periodicity values for CG SPS Configurations | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |
R2-1915995 | Repetitions Transmission for SPS configurations | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |
R2-1915996 | Down selection on the PDCP Duplication MAC CE Structure | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1915997 | Message Mergence for fast HO failure recovery | discussion | CMCC | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.4 |
available | [WTS] [JSN] | |
R2-1915998 | Discussion of UL data transmission switch for DAPS |
discussion revised to R2-1916079 |
CMCC | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.2 |
revised | [WTS] [JSN] | |
R2-1915999 | Left issues of the new confirmation MAC CE format | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | |
R2-1916000 | Handling for CG resource collision of equal priority | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |
R2-1916001 | Discussion on impact of PDCCH-WUS on timer-based BWP switching | discussion | CMCC | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | ||
R2-1916002 | Discussion on UE assistance information | discussion | CMCC | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | ||
R2-1916003 | Discussion on human-readable network name | discussion | China Telecommunications |
R2-108 AI: 6.18.4 |
withdrawn | [WTS] [JSN] | |||
R2-1916004 | Sidelink RSRP reporting | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | ||
R2-1916005 | Sidelink RLF enhancement | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | ||
R2-1916006 | Remaining issues on user plane aspects | discussion | LG Electronics | NR_2step_RACH-Core |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | ||
R2-1916007 | Open issue of uplink MDBV enforcement | discussion | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1916008 | Correction on PRACH procedure with SRS switching |
CR revised to R2-1916551 |
Huawei, HiSilicon | 38.321 15.7.0 CR#680 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
revised | [WTS] [JSN] |
R2-1916009 | Correction on description of BFR RAR window in 38.321 | CR | Huawei, HiSilicon | 38.321 15.7.0 CR#681 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
not pursued | [WTS] [JSN] |
R2-1916010 | Stopping ra-ResponseWindow for contention-free BFR | discussion | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1916011 | Summary of [107bis#48][TEI16UP] Correction on PRACH re-transmission for SRS carrier switching | discussion | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
noted | [WTS] [JSN] | |
R2-1916012 | Correction on autonomous RACH retransmission for SRS switching | draftCR | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
endorsed | [WTS] [JSN] | |
R2-1916013 | Remaining issues on PDU format for MsgB | discussion | Huawei, HiSilicon | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1916014 | MsgA resource configuration and selection | discussion | Huawei, HiSilicon | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1916015 | Remaining issues on MsgB reception | discussion | Huawei, HiSilicon | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1916016 | Discussion on MsgB-RNTI design | discussion | Huawei, HiSilicon | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1916017 | Remaining issues on the msgA transmission | discussion | Huawei, HiSilicon | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.3 |
available | [WTS] [JSN] | |
R2-1916018 | Further Discussions on Fallback Procedure for 2-step RACH | discussion | Huawei, HiSilicon | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1916019 | Discussion on RRC configurations of L1 parameters for eURLLC | discussion | Huawei, HiSilicon | NR_L1enh_URLLC-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
noted | [WTS] [JSN] | |
R2-1916020 | Running 38.331 CR for NR_L1enh_URLLC |
draftCR revised to R2-1916266 |
Huawei, HiSilicon | NR_L1enh_URLLC-Core | Rel-16 |
R2-108 AI: 6.22.1 |
revised | [WTS] [JSN] | |
R2-1916021 | Overview of MAC impacts of URLLC enhancement | discussion | Huawei, HiSilicon | NR_L1enh_URLLC-Core | Rel-16 |
R2-108 AI: 6.22.2 |
noted | [WTS] [JSN] | |
R2-1916022 | Running 38.321 CR for NR_L1enh_URLLC |
draftCR revised to R2-1916354 |
Huawei, HiSilicon | NR_L1enh_URLLC-Core | Rel-16 |
R2-108 AI: 6.22.2 |
revised | [WTS] [JSN] | |
R2-1916023 | Running 38.300 CR for NR_L1enh_URLLC | draftCR | Huawei, HiSilicon | NR_L1enh_URLLC-Core | Rel-16 |
R2-108 AI: 6.22.2 |
postponed | [WTS] [JSN] | |
R2-1916024 | RNTI for msgB | discussion | LG Electronics | NR_2step_RACH-Core |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | ||
R2-1916025 | Considerations on simultaneous configuration of mode 1 and 2 |
discussion revision of R2-1913856 |
ITL | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | ||
R2-1916026 | Reselection to a Cell with Valid Dedicated Frequency Offset |
discussion revision of R2-1912998 |
MediaTek Inc. |
R2-108 AI: 4.1 |
noted | [WTS] [JSN] | |||
R2-1916027 | Draft LS to RAN1 on RNTI for msgB |
LS out LS To: RAN1 |
LG Electronics | NR_2step_RACH-Core |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | ||
R2-1916028 | Consideration on 2-step CFRA |
discussion revision of R2-1913879 |
LG Electronics | NR_2step_RACH-Core |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | ||
R2-1916029 | Logical channel based RA type selection |
discussion revision of R2-1913877 |
LG Electronics Inc. | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.4 |
available | [WTS] [JSN] | |
R2-1916030 | Running CR to 38.300 on 5G V2X with NR sidelink |
draftCR revised to R2-1916638 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1916031 | Running CR to 36.300 on 5G V2X with NR sidelink | draftCR | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
withdrawn | [WTS] [JSN] | |
R2-1916032 | Clarification on informative timer table | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1414 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
not treated | [WTS] [JSN] |
R2-1916033 | Clarification on the using of RRCSetup |
CR revised to R2-2001186 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1415 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
not treated | [WTS] [JSN] |
R2-1916034 | Corrections on the PDCP duplication |
CR revised to R2-1916549 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1416 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.2 |
revised | [WTS] [JSN] |
R2-1916035 | Correction on initial BWP bandwidth capabilities |
CR revised to R2-1916546 |
Huawei, HiSilicon | 38.306 15.7.0 CR#215 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
revised | [WTS] [JSN] |
R2-1916036 | Remaining issues on random access procedures in NTN | discussion | ETRI | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1916037 | Remaining issues of SCell BFR |
discussion revised to R2-2001599 |
ASUSTeK | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1916038 | Discussion on association between sidelink data and resource allocation modes |
discussion revision of R2-1913772 |
ASUSTeK | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |
R2-1916039 | Discussion on resource allocation for sidelink HARQ ACK/NACK report | discussion | ASUSTeK | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |
R2-1916040 | Discussion on traditional uplink traffic and IAB uplink traffic regarding to pre-emptive BSR | discussion | ASUSTeK | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | |
R2-1916041 | Handling D-PUR configuration in RRC_CONNECTED state | discussion | ASUSTeK | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1916042 | Remaining issues of D-PUR TA timer |
discussion revision of R2-1913775 |
ASUSTeK | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1916043 | Buffer status indicated by BSR in multi-TB scheduling |
discussion revision of R2-1913774 |
ASUSTeK | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.5 |
noted | [WTS] [JSN] | |
R2-1916044 | Issue related to CG overridden by PDCCH |
discussion revised to R2-1916497 |
ASUSTeK | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
revised | [WTS] [JSN] | |
R2-1916045 | CG overridden | CR | ASUSTeK | 38.321 15.7.0 CR#682 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
not pursued | [WTS] [JSN] |
R2-1916046 | Release of UE assistance information | discussion | OPPO | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1916047 | Correction on RRC Resume procedure |
CR revision of R2-1912404 |
OPPO | 38.331 15.7.0 CR#12691 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.6 |
not treated | [WTS] [JSN] |
R2-1916048 | Discussion on human-readable network name | discussion | China Telecom, Huawei, HiSilicon |
R2-108 AI: 6.18.4 |
available | [WTS] [JSN] | |||
R2-1916049 | Consideration of beam for NR OTDOA |
discussion revision of R2-1912534 |
Samsung R&D Institute UK |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |||
R2-1916050 | Considerations for NR E-CID |
discussion revision of R2-1912533 |
Samsung R&D Institute UK |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |||
R2-1916051 | Measurement aspects for CHO |
discussion revision of R2-1912529 |
Samsung R&D Institute UK |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |||
R2-1916052 | Clarification on failure handling using CHO | discussion | Samsung R&D Institute UK |
R2-108 AI: 6.9.3.2 |
withdrawn | [WTS] [JSN] | |||
R2-1916053 | Normal handover using conditional handover configuration | discussion | Samsung R&D Institute UK |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |||
R2-1916054 | On the supporting of relaxed measurement state for UE power saving |
discussion revision of R2-1912531 |
Samsung R&D Institute UK |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | |||
R2-1916055 | EN-DC support in IAB |
discussion revision of R2-1912535 revised to R2-2001634 |
Samsung R&D Institute UK |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |||
R2-1916056 | NR-DC support in IAB (signaling perspective) |
discussion revision of R2-1912536 revised to R2-2001624 |
Samsung R&D Institute UK |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |||
R2-1916057 | Remaining issues on IAB RLF | discussion | Samsung R&D Institute UK |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |||
R2-1916058 | Delivering T_delta for IAB node | discussion | Samsung R&D Institute UK |
R2-108 AI: 6.1.4.3 |
available | [WTS] [JSN] | |||
R2-1916059 | Discussion on UE capability | discussion | China Telecom |
R2-108 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R2-1916060 | RNTI design for msgB | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1916061 | Cell Selection for Backhaul RLF Recovery |
discussion revision of R2-1913544 revised to R2-2001348 |
Futurewei Technologies |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | |||
R2-1916062 | Contention resolution for msgA with C-RNTI | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1916063 | Discussion on the deployment for CAG | discussion | China Telecom, Huawei, HiSilicon |
R2-108 AI: 6.18.4 |
available | [WTS] [JSN] | |||
R2-1916064 | msgB MAC PDU format | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1916065 | Remaining issue on 2-step RACH fall back procedure | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1916066 | Enhanced TCI States Activation/Deactivation PDSCH MAC CE for Multi-TRP |
discussion revision of R2-1913407 |
Qualcomm Incorporated | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
available | [WTS] [JSN] | |
R2-1916067 | Procedures and MAC CE design for BFR for SCells |
discussion revision of R2-1913833 |
Qualcomm Incorporated | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1916068 | Some Considerations on autonomous re-transmission for deprioritized configured grant | discussion | ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1916069 | The remaining issues on BFR on SCell | discussion | ZTE Corporation, Sanechips | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.4 |
available | [WTS] [JSN] | |
R2-1916070 | The remaining issues on mPDCCH mTRP transmission | discussion | ZTE Corporation, Sanechips | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
noted | [WTS] [JSN] | |
R2-1916071 | The remaining issues on LCP restriction for CG | discussion | ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.2.2 |
available | [WTS] [JSN] | |
R2-1916072 | The CR to 38.321 for on UL grant reception in RAR | CR | ZTE Corporation, Sanechips | 38.321 15.7.0 CR#683 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
not pursued | [WTS] [JSN] |
R2-1916073 | Considerations on support of split bearer in the case of PDCP duplication with multiple copies |
discussion revision of R2-1913044 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1916074 | Discussion on UE based PDCP Duplication activationdeactivation |
discussion revision of R2-1913045 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.2 |
available | [WTS] [JSN] | |
R2-1916075 | Consideration on the multiplexing BSR MAC CE and URLLC data |
discussion revision of R2-1913046 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.4 |
available | [WTS] [JSN] | |
R2-1916076 | Consideration on HARQ conflict between configured grant and dynamic grant |
discussion revision of R2-1913047 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |
R2-1916077 | Discussion on the ambiguity in calculation of RA-RNTI |
discussion revision of R2-1913051 |
ZTE Corporation, Sanechips | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1916078 | Discussion on UE behaviours for access barring alleviation | discussion | Google Inc. | TEI16 |
R2-108 AI: 6.20.1 |
available | [WTS] [JSN] | ||
R2-1916079 | Discussion of UL data transmission switch for DAPS |
discussion revision of R2-1915998 |
CMCC | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.1.2 |
available | [WTS] [JSN] | |
R2-1916080 | Clarification on UE Inactive AS context | CR | Google Inc. | 36.304 15.4.0 CR#776 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-108 AI: 4.5.1 |
not treated | [WTS] [JSN] |
R2-1916081 | Correction on PUSCH-less Scell | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1417 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
not pursued | [WTS] [JSN] |
R2-1916082 | Clarification on UE Inactive AS context |
CR revised to R2-1916313 |
Google Inc. | 36.331 15.7.0 CR#4177 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1916083 | Discussion on MSGB-RNTI design | discussion |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | ||||
R2-1916084 | Discussion on msgB HARQ process | discussion |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | ||||
R2-1916085 | RLC re-establishment when PDCP is re-established | CR | Qualcomm Incorporated | 38.331 15.7.0 CR#1418 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
not pursued | [WTS] [JSN] |
R2-1916086 | On Supporting Make-Before-Break in NR | discussion | Samsung | NR_Mob_enh-Core |
R2-108 AI: 6.9.2 |
withdrawn | [WTS] [JSN] | ||
R2-1916087 | Introducing Make-Before-Break in NR | draftCR | Samsung | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.2 |
available | [WTS] [JSN] | |
R2-1916088 | Open Issues on NR-U Uplink Transmission | discussion | Qualcomm Incorporated |
R2-108 AI: 6.2.2.6 |
noted | [WTS] [JSN] | |||
R2-1916089 | On Triggering RRM Measurement Relaxation | discussion | Samsung | NR_UE_pow_sav-Core |
R2-108 AI: 6.11.6 |
available | [WTS] [JSN] | ||
R2-1916090 | Remaining issue on Groupcast and Broadcast QoS Report | discussion | ITRI | 5G_V2X_NRSL-Core |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | ||
R2-1916091 | Remaining issue on UE-based positioning in NR | discussion | ITRI | NR_pos-Core |
R2-108 AI: 6.8.2.4 |
available | [WTS] [JSN] | ||
R2-1916092 | On NR-U Operation in DFS Channels | discussion | Charter Communications, Inc | Rel-16 |
R2-108 AI: 6.2.3.5 |
noted | [WTS] [JSN] | ||
R2-1916093 | Accessibility Measurements for NR MDT | discussion | Samsung | NR_SON_MDT-Core |
R2-108 AI: 6.12.2 |
noted | [WTS] [JSN] | ||
R2-1916094 | Remaining Issues on Consistent LBT Failure Detection in NRU | discussion | Charter Communications, Inc |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |||
R2-1916095 | Further Logged Information in NR MDT | discussion | Samsung | NR_SON_MDT-Core |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | ||
R2-1916096 | Discussion on the support of CA duplication with multiple legs | discussion | vivo |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |||
R2-1916097 | Discussion on Network identifier for SNPN |
discussion revised to R2-2001072 |
vivo |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |||
R2-1916098 | Discussion on the proximity indication in CONNECTED mode |
discussion revised to R2-2001071 |
vivo |
R2-108 AI: 6.18.3 |
available | [WTS] [JSN] | |||
R2-1916099 | IP address configuration for IAB | discussion | Samsung | Rel-16 |
R2-108 AI: 6.1.5.2 |
available | [WTS] [JSN] | ||
R2-1916100 | RLF Report Enhancement | discussion | Samsung | NR_SON_MDT-Core |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | ||
R2-1916101 | UL mapping configuration | discussion | Samsung | Rel-16 |
R2-108 AI: 6.1.3.2 |
available | [WTS] [JSN] | ||
R2-1916102 | On supporting Event-triggered Logged MDT | discussion | Samsung | NR_SON_MDT-Core |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | ||
R2-1916103 | On Providing Mobility State and Mobility History Information in NR | discussion | Samsung | NR_SON_MDT-Core |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | ||
R2-1916104 | PDCP enhancement for NTN | discussion | LG Electronics Inc. | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.2 |
not treated | [WTS] [JSN] | |
R2-1916105 | Angle of Departure UE positioning technique |
discussion revision of R2-1913593 |
Nokia, Nokia Shanghai Bell | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |
R2-1916106 | On-demand and dynamic PRS configuration for DL-TDOA | discussion | Nokia, Nokia Shanghai Bell | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |
R2-1916107 | Dedicated positioning SIB delivery for on-demand SI in connected | discussion | Nokia, Nokia Shanghai Bell | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.3.2 |
noted | [WTS] [JSN] | |
R2-1916108 | PC5 groupcast handling |
discussion revision of R2-1913595 |
Qualcomm Incorporated | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1916109 | plmn-IdentityList in CellAccessRelatedInfo broadcast in SIB1 | CR | Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1419 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.6 |
not pursued | [WTS] [JSN] |
R2-1916110 | Handling of new flow when the number of stored contexts are already equal to the MAX_CID |
discussion revision of R2-1913881 |
SHARP Corporation | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |
R2-1916111 | On per DAPS handover | discussion | SHARP Corporation | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | |
R2-1916112 | Stopping of SI acquisition for ETWS/CMAS | CR | Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1420 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.6 |
not pursued | [WTS] [JSN] |
R2-1916113 | Handling of bwp-InactivityTimer upon BWP switching |
discussion revised to R2-2001299 |
LG Electronics Deutschland | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1916114 | On Stopping of Paging Monitoring for UE Energy Savings | discussion | MediaTek Inc. |
R2-108 AI: 6.2.3.1 |
available | [WTS] [JSN] | |||
R2-1916115 | Remaining issues on RACH without location information | discussion | Huawei, HiSilicon | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1916116 | RACH resource configuration and utilization in NTN | discussion | Huawei, HiSilicon | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1916117 | Running CR for the introduction of SRVCC from 5G to 3G |
draftCR revised to R2-1916334 |
China Unicom, Huawei, HiSilicon | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.1 |
revised | [WTS] [JSN] | |
R2-1916118 | Handling LBT failures for support of wideband operations | discussion | ETRI | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |
R2-1916119 | Running CR to 36.321 on 5G V2X with NR sidelink | draftCR | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1916120 | Running CR to 38.321 on 5G V2X with NR sidelink | draftCR | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1916121 | Report of 107bis#93 open issues on 38.321 on NR Sidelink | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1916122 | Proposed LS on TX resource (re-)reselection |
LS out LS To: RAN1 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
available | [WTS] [JSN] | |
R2-1916123 | Remaining MAC issues and response to RAN1 LS | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1916124 | Proposed Response LS on additional high layer information for sidelink physical layer operations |
LS out LS To: RAN1 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1916125 | PC5-RRC connection establishment and release with PC5 unicast link | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1916126 | PC5-RRC and Uu RRC procedures |
discussion revision of R2-1910640 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1916127 | MAC header for SL-SCH | discussion | Qualcomm CDMA Technologies |
R2-108 AI: 6.4.8 |
available | [WTS] [JSN] | |||
R2-1916128 | Remaining issues on CLI measurement | discussion | ZTE Corporation, Sanechips | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.2 |
noted | [WTS] [JSN] | |
R2-1916129 | Reply LS on signalling of sidelink RSRP and CSI |
LS out LS To: RAN1 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1916130 | Sidelink HARQ operation in mode 1 | discussion | ITL |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |||
R2-1916131 | Retransmission of an RLC SDU with a poll after discard procedure | discussion | LG Electronics Inc., Ericsson, NTT Docomo, LG Uplus | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1916132 | Consideration on the postponed decision on DL hop-by-hop flow control | discussion | LG Electronics, AT&T, Ericsson, Huawei, Verizon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | |
R2-1916133 | Consideration on local re-routing after BH RLF | discussion | LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |
R2-1916134 | BSR MAC CE format for pre-BSR |
discussion revision of R2-1913818 |
LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
available | [WTS] [JSN] | |
R2-1916135 | Consideration on remaining FFS of LCID extension | discussion | LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.2 |
available | [WTS] [JSN] | |
R2-1916136 | Remaining issues for DL flow control | discussion | LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | |
R2-1916137 | LCG based UL grant |
discussion revision of R2-1913817 revised to R2-2001560 |
LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.3 |
available | [WTS] [JSN] | |
R2-1916138 | Way forward for CP bearer mapping |
discussion revision of R2-1913822 |
LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.2 |
available | [WTS] [JSN] | |
R2-1916139 | Need of BAP buffer |
discussion revised to R2-2001562 |
LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.4 |
available | [WTS] [JSN] | |
R2-1916140 | Consideration on BAP Routing ID for UL | discussion | LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3.1 |
available | [WTS] [JSN] | |
R2-1916141 | Discussion on the flow control |
discussion revision of R2-1913871 |
ITL |
R2-108 AI: 6.1.3.3 |
available | [WTS] [JSN] | |||
R2-1916142 | NE-DC dynamic power sharing capability | CR | Qualcomm Incorporated | 38.331 15.7.0 CR#1421 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
agreed | [WTS] [JSN] |
R2-1916143 | NE-DC dynamic power sharing capability |
CR revised to R2-1916545 |
Qualcomm Incorporated | 38.306 15.7.0 CR#216 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
revised | [WTS] [JSN] |
R2-1916144 | DL BWP Configuration mandatory fields upon SCell addition | CR | Qualcomm Incorporated | 38.331 15.7.0 CR#1422 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1916145 | Allow fallback band combinations for reporting SRS-TxSwitch capability | CR | Qualcomm Incorporated | 38.306 15.7.0 CR#217 catC | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1916146 | Expectation when srs-TxSwitch capability is not supported | CR | Qualcomm Incorporated | 38.306 15.7.0 CR#218 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not pursued | [WTS] [JSN] |
R2-1916147 | Discussion of the PUCCH & SRS Resource Release | discussion | Qualcomm Incorporated | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1916148 | Discussion on DRX operation associated with disabling HARQ feedback |
discussion revision of R2-1913869 |
LG Electronics Polska | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1916149 | PC5-RRC and PC5-S interactions and their security in NR V2X |
discussion revision of R2-1913510 |
Qualcomm Incorporated | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1916150 | Discussion on L2 measurement in EN-DC |
discussion revision of R2-1913855 |
NTT DOCOMO INC. | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.3 |
available | [WTS] [JSN] | |
R2-1916151 | Further consideration on capability reporting |
discussion revision of R2-1913919 |
LG Electronics Inc. | Rel-16 |
R2-108 AI: 6.10.3 |
available | [WTS] [JSN] | ||
R2-1916152 | Further Considerations on multiple C-DRX | discussion | Samsung |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |||
R2-1916153 | MAC impacts of multiple CCAs in wide band operation |
discussion revision of R2-1913878 revised to R2-2001451 |
LG Electronics Polska | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.7 |
available | [WTS] [JSN] | |
R2-1916154 | Discussion on UE location information in SCG failure report |
discussion revision of R2-1913777 |
NTT DOCOMO INC. , Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
noted | [WTS] [JSN] | |
R2-1916155 | Remaining issues of header compression for IIoT | discussion | NTT DOCOMO INC. | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |
R2-1916156 | UE autonomous transmission in a CG resource for deprioritized data | discussion | Huawei, HiSilicon | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1916157 | Clarification of suspended SCG | discussion | LG Electronics Inc. | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1916158 | Discussion on LTE and EN-DC Measurement Gap configuration coordination | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
noted | [WTS] [JSN] | |
R2-1916159 | PDCP for PC5-S, PC5-RRC | discussion | Qualcomm CDMA Technologies |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1916160 | Discussion and TP on MAC PDU overwriting in CG resource | draftCR | LG Electronics Polska | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.5 |
available | [WTS] [JSN] | |
R2-1916161 | Resumption of suspended SCG | discussion | LG Electronics Inc. | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | ||
R2-1916162 | PC5-S, PC5-RRC RLC mode | discussion | Qualcomm CDMA Technologies |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1916163 | Discussion on indication for presence of RRC messages | discussion | LG Electronics Polska | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
available | [WTS] [JSN] | |
R2-1916164 | Draft TS 38.340 (BAP) |
draft TS revised to R2-1916636 |
Huawei | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.3 |
revised | [WTS] [JSN] | |
R2-1916165 | PC5-RRC support for Groupcast | discussion | Qualcomm CDMA Technologies |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1916166 | Management of Control Plane during DAPS HO_NR | discussion | LG Electronics France | NR_Mob_enh-Core |
R2-108 AI: 7.3.2.2.1 |
available | [WTS] [JSN] | ||
R2-1916167 | Access control in IAB networks | discussion | LG Electronics France | NR_IAB-Core |
R2-108 AI: 6.1.5.3 |
available | [WTS] [JSN] | ||
R2-1916168 | BH RLF Notification Terminaton Layer | discussion | LG Electronics France | NR_IAB-Core |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | ||
R2-1916169 | Resolving open issues on BH RLF | discussion | LG Electronics France | NR_IAB-Core |
R2-108 AI: 6.1.5.1 |
available | [WTS] [JSN] | ||
R2-1916170 | Access control for PRN | discussion | LG Electronics France | NG_RAN_PRN-Core |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | ||
R2-1916171 | MDT for DC | discussion | LG Electronics France | NR_SON_MDT-Core |
R2-108 AI: 6.12.2 |
available | [WTS] [JSN] | ||
R2-1916172 | Clarification on CSI reporting in C-DRX |
CR revision of R2-1914175 |
Qualcomm Inc | 38.321 15.7.0 CR#6723 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
agreed | [WTS] [JSN] |
R2-1916173 | Correction to PHR in dual connectivity |
CR revision of R2-1913898 revised to R2-1916398 |
Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | 36.321 15.7.0 CR#6603 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
revised | [WTS] [JSN] |
R2-1916174 | Correction to long truncated BSR | CR | Qualcomm Inc | 38.321 15.7.0 CR#684 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
not pursued | [WTS] [JSN] |
R2-1916175 | Configuration aspects of wakeup signaling |
discussion revision of R2-1913899 |
Qualcomm Inc | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | ||
R2-1916176 | Link management with WUS | discussion | Qualcomm Inc | Rel-16 |
R2-108 AI: 6.11.2 |
noted | [WTS] [JSN] | ||
R2-1916177 | Prohibit timer for Release Request | discussion | Qualcomm Inc | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | ||
R2-1916178 | Remaining issues on UE Assistance Information | discussion | Qualcomm Inc | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | ||
R2-1916179 | UE indication on expected data |
discussion revision of R2-1913901 |
Qualcomm Inc, Apple | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | ||
R2-1916180 | Cross cell group wakeup message in MR-DC | discussion | Qualcomm Inc, Futurewei | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | ||
R2-1916181 | Backoff indication in multi-beam operation |
discussion revision of R2-1911307 |
Qualcomm Inc | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | ||
R2-1916182 | Enhancements to PHR in multi-beam operation |
discussion revision of R2-1911308 |
Qualcomm Inc | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | ||
R2-1916183 | New values for RLC and PDCP timers | discussion | Qualcomm Inc, LG Electronics | Rel-16 |
R2-108 AI: 6.22.2 |
noted | [WTS] [JSN] | ||
R2-1916184 | Correction on mini-slot scheduling | CR | Fujitsu, Nokia (Rapporteur) | 38.3 15.7.0 CR#181 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.1 |
agreed | [WTS] [JSN] |
R2-1916185 | Impacts of L1 priorities on data prioritization | discussion | Fujitsu | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
available | [WTS] [JSN] | |
R2-1916186 | Remaining issues on de-prioritized MAC PDU on CG resource | discussion | LG Electronics Polska | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1916187 | General aspects on cDRX enhancement | discussion | NEC | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | |
R2-1916188 | CR on LTE and EN-DC Measurement Gap configuration coordination | CR | Nokia, Nokia Shanghai Bell | 36.331 15.7.0 CR#4178 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1916189 | Sidelink CSI report | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | ||
R2-1916190 | Inter-RAT BSR | discussion | MediaTek Inc. | Rel-16 |
R2-108 AI: 6.4.7 |
available | [WTS] [JSN] | ||
R2-1916191 | CR on NeedForGap capability for each supported NR band before EN-DC configuration | CR | Nokia, Nokia Shanghai Bell | 36.331 15.7.0 CR#4179 catC | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1916192 | Work plan for Rel-16 UE Capability feature list |
discussion revision of R2-1914581 |
Intel Corporation | NR_newRAT-Core | Rel-16 |
R2-108 AI: 6 |
endorsed | [WTS] [JSN] | |
R2-1916193 | Discussion on NeedForGap signalling in NR SA before NE-DC or NR-DC configuration | discussion | Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1916194 | Discussion on multiple triggering conditions for CHO | discussion | Samsung Electronics Polska | NR_Mob_enh-Core |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | ||
R2-1916195 | Confirmation of working assumption for T312 support on PSCell | discussion | Samsung, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | NR_Mob_enh-Core |
R2-108 AI: 6.9.3.4 |
noted | [WTS] [JSN] | ||
R2-1916196 | Discussion on DRX operation impact for NTN | discussion | Nokia, Nokia Shanghai Bell | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1916197 | CHO compliance check and handling | discussion | CMCC | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | ||
R2-1916198 | Introduction of T312 for PCell and PSCell in NR (Draft) |
draftCR revised to R2-1916640 |
Samsung, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.4 |
revised | [WTS] [JSN] | |
R2-1916199 | Further consideration on T312 for conditional handover | discussion | LG Electronics Inc | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.4 |
available | [WTS] [JSN] | |
R2-1916200 | Cell (re)selection after consecutive UL LBT failures | discussion | LG Electronics Inc | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
available | [WTS] [JSN] | |
R2-1916201 | RLM/RLF enhancements in NR-U |
discussion revision of R2-1913752 |
LG Electronics Inc | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.3 |
available | [WTS] [JSN] | |
R2-1916202 | SSI and channel occupancy measurements for serving frequency |
discussion revision of R2-1913753 |
LG Electronics Inc | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.2 |
available | [WTS] [JSN] | |
R2-1916203 | Stopping condition for monitoring additional paging occasions in NR-U | discussion | LG Electronics Inc | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.1 |
available | [WTS] [JSN] | |
R2-1916204 | Support of conditional handover for NR-U | discussion | LG Electronics Inc | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.2 |
available | [WTS] [JSN] | |
R2-1916205 | Measurement ID Swapping Issue for CHO |
discussion revised to R2-2001537 |
LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1916206 | Consideration of CHO Release After HO | discussion | LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1916207 | SCG Failure Handling with Conditional PSCell Configuration |
discussion revised to R2-2001538 |
LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1916208 | Consideration of After-action upon Conditional PSCell Addition | discussion | LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1916209 | Consideration of Compliance Check in CHO |
discussion revision of R2-1913862 |
LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1916210 | Handling Excess of UE Capability in DAPS HO |
discussion revision of R2-1913864 revised to R2-2001539 |
LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1916211 | Introduction of Cross Link Interference (CLI) handling and Remote Interference Management (RIM) |
CR revised to R2-1916338 |
LG Electronics Inc | 38.331 15.7.0 CR#1423 catB | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
revised | [WTS] [JSN] |
R2-1916212 | Padding Removal and Feedback for Context Establishment | discussion | China Telecommunications |
R2-108 AI: 6.7.2.3 |
available | [WTS] [JSN] | |||
R2-1916213 | AS-layer configuration failure case in SL unicast |
discussion revision of R2-1912441 |
Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1916214 | MAC PDU handling for Sidelink UE capabilities and Sidelink RRC reconfiguration | discussion | Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1916215 | Remaining issues on reselection priority handlings for V2X | discussion | Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1916216 | Interaction between RRC Connection Resume Condition and RNAU for NR V2X SL Communication |
discussion revision of R2-1912444 |
Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1916217 | Discussion on SL-RSRP reporting | discussion | Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |
R2-1916218 | Remaining Issues on Handling of SLRB configuration handling | discussion | Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1916219 | UE Assistance for Release Request | discussion | Samsung | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.3 |
available | [WTS] [JSN] | |
R2-1916220 | SLRB Reconfiguration Handling |
discussion revision of R2-1912489 |
Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1916221 | Transmission of Deprioritized Data by Retransmission Grant | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1916222 | Split Bearer Fallback at Deactivation of PDCP Duplication |
discussion revision of R2-1912496 |
Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
available | [WTS] [JSN] | |
R2-1916223 | Configuration and Initial State of PDCP Duplication |
discussion revision of R2-1912497 |
Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
noted | [WTS] [JSN] | |
R2-1916224 | Fast failure recovery in CHO | discussion | Samsung R&D Institute India |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | |||
R2-1916225 | Cell Reselection remaining issues | discussion | Samsung R&D Institute India |
R2-108 AI: 6.18.2 |
available | [WTS] [JSN] | |||
R2-1916226 | CHO UE behaviour upon transitioning to RRC_INACTIVE/RRC_IDLE | discussion | Samsung R&D Institute India |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |||
R2-1916227 | Single stack eMOB solution for NR | discussion | Samsung R&D Institute India |
R2-108 AI: 7.3.2.3 |
available | [WTS] [JSN] | |||
R2-1916228 | Email discussion report [107bis#90] Further details on “m” operation for PUR | discussion | Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
noted | [WTS] [JSN] | |
R2-1916229 | TP for TA validation based on serving cell RSRP change (related to RAN4 LSes) | draftCR | Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1916230 | CG/SPS alignment on Resource Boundary Pattern |
discussion revision of R2-1913622 |
Sequans Communications | FS_NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
noted | [WTS] [JSN] | |
R2-1916231 | Impact of CG/SPS with periodicities non dividing HF length |
discussion revised to R2-2001627 |
Sequans Communications | FS_NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | |
R2-1916232 | UE autonomous retransmission in a CG resource |
discussion revision of R2-1913624 |
Sequans Communications | FS_NR_IIOT | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1916233 | Enhanced rescheduling for dropped CG |
discussion revision of R2-1913625 revised to R2-2001628 |
Sequans Communications | FS_NR_IIOT | Rel-16 |
R2-108 AI: 6.7.3.1 |
available | [WTS] [JSN] | |
R2-1916234 | On Inter-RAT assistance information for NB-IoT and LTE(-eMTC) |
discussion revision of R2-1913626 |
Sequans Communications | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.8 |
noted | [WTS] [JSN] | |
R2-1916235 | NB-IoT UE Specific DRX - Backward Compatibility |
discussion revision of R2-1913627 |
Sequans Communications | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.11 |
available | [WTS] [JSN] | |
R2-1916236 | NB-IoT UE Specific DRX - Efficiency Issues |
discussion revised to R2-2001630 |
Sequans Communications | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.11 |
available | [WTS] [JSN] | |
R2-1916237 | Support for LTE deployment at IAB node sites |
discussion revision of R2-1913629 |
Sequans Communications | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
available | [WTS] [JSN] | |
R2-1916238 | F1-U Flow Control and Reordering Issues |
discussion revision of R2-1913630 |
Sequans Communications | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.3 |
available | [WTS] [JSN] | |
R2-1916239 | Packet Marking for E2E Flow Control |
discussion revision of R2-1913631 |
Sequans Communications | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.3 |
available | [WTS] [JSN] | |
R2-1916240 | Discussion on Earth fixed vs. Earth moving cells in NTN LEO |
discussion revision of R2-1913923 revised to R2-1916385 |
Nokia, Nokia Shanghai Bell, Thales | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
revised | [WTS] [JSN] | |
R2-1916241 | UE positioning requirements and solution analysis in NTN |
discussion revised to R2-1916384 |
Nokia, Nokia Shanghai Bell, Thales | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4 |
revised | [WTS] [JSN] | |
R2-1916242 | Pre-trigger based mechanism for NTN connected mode mobility enhancements |
discussion revision of R2-1913924 |
Nokia, Nokia Shanghai Bell | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1916243 | RRC message for source and target configuration | discussion | SHARP Corporation | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.2.1 |
noted | [WTS] [JSN] | |
R2-1916244 | CR to 38.306 on DRX-based intra-frequency SFTD measurement |
CR revision of R2-1914665 |
Huawei, HiSilicon | 38.306 15.7.0 CR#1961 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1916245 | CR to 38.331 on DRX-based intra-frequency SFTD measurement |
CR revision of R2-1914666 |
Huawei, HiSilicon | 38.331 15.7.0 CR#13531 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
not treated | [WTS] [JSN] |
R2-1916246 | Remaining issues on CLI | discussion | Ericsson | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.2 |
available | [WTS] [JSN] | |
R2-1916247 | DRX considerations and RAN paging for PUR |
discussion revision of R2-1912894 |
Sequans Communications | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1916248 | Padding removal |
discussion revision of R2-1915695 |
Nokia, Nokia Shanghai Bell, vivo, OPPO, Mediatek, Samsung, Sony, Intel, ZTE, NTT Docomo | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.3 |
noted | [WTS] [JSN] | |
R2-1916249 | TP for TS36.302 on ETSW/CMAS in connected mode for non-BL UE in CE | draftCR | Huawei Tech.(UK) Co., Ltd | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.8 |
available | [WTS] [JSN] | |
R2-1916250 | Way forward on BAP Configuration | discussion | Futurewei |
R2-108 AI: 6.1.5.2 |
noted | [WTS] [JSN] | |||
R2-1916251 | Enhancements for PUR | discussion | Sequans Communications | LTE_eMTC5-Core, NB_IOTenh3-Core |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R2-1916252 | Power and signalling savings at TAT expiry and reaching sr-TransMax | discussion | Ericsson, Nokia, Nokia Shanghai Bell | Rel-16 |
R2-108 AI: 6.20.2 |
available | [WTS] [JSN] | ||
R2-1916253 | Allowing PDCP version change without handover | CR | Ericsson | 38.331 15.7.0 CR#1424 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
postponed | [WTS] [JSN] |
R2-1916254 | Issue on ping pong state transition for sidelink UE | discussion | Beijing Xiaomi Software Tech |
R2-108 AI: 6.4.5 |
available | [WTS] [JSN] | |||
R2-1916255 | Discussion on resource allocation | discussion | Beijing Xiaomi Software Tech |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |||
R2-1916256 | Discussion on the use case of CHO failure recovery | discussion | Beijing Xiaomi Software Tech |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | |||
R2-1916257 | Discussion on BSR prioritization issue | discussion | Beijing Xiaomi Software Tech |
R2-108 AI: 6.4.3 |
available | [WTS] [JSN] | |||
R2-1916258 | [DRAFT] LS on CLI measurements UE capabilities |
LS out LS To: RAN1 revised to R2-1916332 |
Qualcomm Incorporated | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
revised | [WTS] [JSN] | |
R2-1916259 | Discussion on eMIMO MAC CE |
discussion revision of R2-1914711 |
vivo | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.3 |
available | [WTS] [JSN] | |
R2-1916260 | Access control differentiation for IMS registration related signaling | discussion | Intel Corporation | TEI16 | Rel-16 |
R2-108 AI: 6.19 |
postponed | [WTS] [JSN] | |
R2-1916261 | Different Access Control Treatment for IMS signaling in EPS | CR | Intel Corporation | 36.331 15.7.0 CR#4180 catC | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
not treated | [WTS] [JSN] |
R2-1916262 | Security Algorithms for Radio Bearers |
CR revision of R2-1914225 |
Qualcomm Incorporated | 38.331 15.7.0 CR#13324 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1916263 | Remaining issues of SL Prioritization |
discussion revision of R2-1914653 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
available | [WTS] [JSN] | |
R2-1916264 | UE Behavior Clarification during UE States Transition |
discussion revision of R2-1914449 |
CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.6 |
available | [WTS] [JSN] | |
R2-1916265 | Comparison of different PSCell modelling options for SCG suspension | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.3 |
available | [WTS] [JSN] | |
R2-1916266 | Running 38.331 CR for NR_L1enh_URLLC |
draftCR revision of R2-1916020 |
Huawei, HiSilicon | NR_L1enh_URLLC-Core | Rel-16 |
R2-108 AI: 6.22.1 |
available | [WTS] [JSN] | |
R2-1916267 | Proposal for 2-bit downlink channel quality reporting in MSG3 for eMTC |
discussion revision of R2-1915611 |
Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.6 |
available | [WTS] [JSN] | |
R2-1916268 | Forwarding of Reply LS on GUTI allocation for 5G CIoT (C1-198560; contact: Qualcomm) |
LS in LS is reply to C1-195111 source LS: C1-198560 LS To: SA2 |
CT1 | 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1916269 | RA Prioritization for MPS for 2-step RACH |
discussion revision of R2-1915005 |
Perspecta Labs, CISA ECD, AT&T, T-Mobile, Sprint, Verizon, Ericsson, Qualcomm | NR_2step_RACH-Core | Rel-16 |
R2-108 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1916270 | Clarification on crossCarrierScheduling-OtherSCS in R15 | CR | OPPO | 38.331 15.7.0 CR#1425 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not pursued | [WTS] [JSN] |
R2-1916271 | Clarification on crossCarrierScheduling-OtherSCS in R15 | CR | OPPO | 38.306 15.7.0 CR#219 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1916272 | Running CR for the introduction of SRVCC from 5G to 3G |
draftCR revision of R2-1915125 revised to R2-1916333 |
Huawei, HiSilicon, China Unicom | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.1 |
revised | [WTS] [JSN] | |
R2-1916273 | Main issues remaining for Conditional SN initiated SN change |
discussion revision of R2-1915737 |
Samsung Telecommunications | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |
R2-1916274 | On Maximum Number of CHO Candidate Cells and Nodes | discussion | Charter Communications, Inc | NR_Mob_enh, LTE_feMob, NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-108 AI: 6.9.3.1 |
available | [WTS] [JSN] | |
R2-1916275 | Reply LS on NR V2X Security for user plane data and PDCP SN size (S3-193854; contact: LGE) |
LS in LS is reply to R2-1911681 source LS: S3-193854 LS To: RAN2 |
SA3 | FS_eV2X_Sec, 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1916276 | The Reporting of CHO failure | discussion | CMCC |
R2-108 AI: 6.9.3.2 |
available | [WTS] [JSN] | |||
R2-1916277 | Alternative solution for “under-reporting” CSI-RS capabilities |
discussion revised to R2-2000683 |
NTT DOCOMO, INC. | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] | |
R2-1916278 | Impacts of PDCCH-WUS on RRC |
discussion revision of R2-1914525 |
CATT | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |
R2-1916279 | Session notes from NTN offline discussion | discussion | THALES | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.1 |
available | [WTS] [JSN] | |
R2-1916280 | LS on further aspects of Mission Critical Services over 5MBS (S6-192404; contact: AT&T) |
LS in source LS: S6-192404 LS To: SA, RAN, SA2, RAN2, RAN3 |
SA6 | FS_MC5MBS | Rel-17 |
R2-108 AI: 3 |
noted | [WTS] [JSN] | |
R2-1916281 | Report from session on LTE legacy, LTE TEI16 and NR/LTE Rel-16 Mobility | report | Vice Chairman (Nokia) |
R2-108 AI: 8.1 |
approved | [WTS] [JSN] | |||
R2-1916282 | Report from Break-Out Session on SRVCC, CLI, PRN, eMIMO, RACS | report | Vice Chairman (ZTE) |
R2-108 AI: 8.2 |
approved | [WTS] [JSN] | |||
R2-1916283 | Report eMTC breakout session | report | Session chair (Ericsson) |
R2-108 AI: 8.3 |
approved | [WTS] [JSN] | |||
R2-1916284 | Session minutes for NR-U, Power Savings, NTN and 2-step RACH | report | Session chair (InterDigital) |
R2-108 AI: 8.4 |
approved | [WTS] [JSN] | |||
R2-1916285 | Report from session on Rel-15 and 16 LTE and NR positioning | report | Session chair (MediaTek) |
R2-108 AI: 8.5 |
approved | [WTS] [JSN] | |||
R2-1916286 | Report from SOM/MDT session | report | Session chair (CMCC) |
R2-108 AI: 8.6 |
approved | [WTS] [JSN] | |||
R2-1916287 | Report NB-IoT breakout session | report | Session chair (Huawei) |
R2-108 AI: 8.7 |
approved | [WTS] [JSN] | |||
R2-1916288 | Report from session on LTE V2X and NR V2X | report | Session chair (Samsung) |
R2-108 AI: 8.8 |
approved | [WTS] [JSN] | |||
R2-1916289 | LS on GUTI allocation for MT-EDT in 5G CIoT (C1-199005; contact: Huawei) |
LS in source LS: C1-199005 LS To: SA2, RAN2, RAN3 |
CT1 | 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1916290 | LS on enhanced access control for IMS signalling (C1-199007; contact: NTT DOCOMO) |
LS in source LS: C1-199007 LS To: SA1 |
CT1 | 5GProtoc16, SAES16 | Rel-16 |
R2-108 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1916291 | Reply LS on assistance indication for WUS (C1-199008; contact) |
LS in LS is reply to S2-1910549 source LS: C1-199008 LS To: SA2, RAN2, RAN3 |
CT1 | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.1 |
available | [WTS] [JSN] | |
R2-1916292 | LS on Extended NAS timers for Coverage Enhancement in 5GS (C1-199034; contact: Ericsson) |
LS in source LS: C1-199034 LS To: RAN2 |
CT1 | 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1916293 | CR of TS 36.355 for introducing NavIC in LTE |
CR revision of R2-1914764 revised to R2-1916406 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs Private Limited, Tejas Networks Ltd., Qualcomm Incorporated | 36.355 15.5.0 CR#2473 catB | LCS_NAVIC | Rel-16 |
R2-108 AI: 7.7 |
revised | [WTS] [JSN] |
R2-1916294 | CR of TS 36.331 for introducing NavIC in LTE |
CR revision of R2-1914765 revised to R2-1916407 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs Private Limited, Tejas Networks Ltd., Qualcomm Incorporated | 36.331 15.7.0 CR#41372 catB | LCS_NAVIC | Rel-16 |
R2-108 AI: 7.7 |
revised | [WTS] [JSN] |
R2-1916295 | Discussion on PDCCH-WUS missing problems during BWP switching and handover |
discussion revision of R2-1914987 |
Xiaomi Communications |
R2-108 AI: 6.11.2 |
available | [WTS] [JSN] | |||
R2-1916296 | Correction to Pcompensation for FR2 |
CR revised to R2-1916630 |
Huawei, HiSilicon | 38.304 15.5.0 CR#143 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R2-1916297 | IAB remaining issues | discussion | Qualcomm Incorporated (Rapporteur) |
R2-108 AI: 6.1.1 |
noted | [WTS] [JSN] | |||
R2-1916298 | WF on UL BAP routing ID | discussion | Qualcomm Incorporated (Rapporteur) |
R2-108 AI: 6.1.3.1 |
noted | [WTS] [JSN] | |||
R2-1916299 | Discussion on PRACH coordination |
discussion revision of R2-1914508 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
available | [WTS] [JSN] | |
R2-1916300 | Report on Email Discussion [107b#52][NR MobE] Open issues Conditional PSCell addition/change |
discussion revision of R2-1915962 |
CATT | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
noted | [WTS] [JSN] | |
R2-1916301 | Clarification on RA and Msg3 with PUSCH Enhancements |
CR revision of R2-1915624 |
Nokia, Nokia Shanghai Bell | 36.321 14.11.0 CR#14565 catF | LTE_VoLTE_ViLTE_enh | Rel-14 |
R2-108 AI: 4.5 |
agreed | [WTS] [JSN] |
R2-1916302 | Clarification on RA and Msg3 with PUSCH Enhancements |
CR revision of R2-1915625 |
Nokia, Nokia Shanghai Bell | 36.321 15.7.0 CR#14574 catA | LTE_VoLTE_ViLTE_enh | Rel-15 |
R2-108 AI: 4.5 |
agreed | [WTS] [JSN] |
R2-1916303 | Correction to SIB5 acquisition for idle mode measurements |
CR revision of R2-1915367 revised to R2-1916305 |
Ericsson | 36.331 15.7.0 CR#41203 catF | LTE_5GCN_connect-Core, LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1916304 | Correction on inter-frequency neighbour cell measurements |
CR revision of R2-1915524 |
Ericsson | 36.3 15.7.0 CR#12523 catF | LTE_5GCN_connect-Core, LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5 |
agreed | [WTS] [JSN] |
R2-1916305 | Correction to SIB5 acquisition for idle mode measurements |
CR revision of R2-1916303 |
Ericsson | 36.331 15.7.0 CR#41204 catF | LTE_5GCN_connect-Core, LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5 |
agreed | [WTS] [JSN] |
R2-1916306 | Clarification on sCellIndex and SCell lists | CR | Ericsson, Nokia, Nokia Shanghai Bell, ZTE | 36.331 13.14.0 CR#4181 catF | LTE_CA_enh_b5C-Core | Rel-13 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1916307 | Clarification on sCellIndex and SCell lists | CR | Ericsson, Nokia, Nokia Shanghai Bell, ZTE | 36.331 14.12.0 CR#4182 catA | LTE_CA_enh_b5C-Core | Rel-14 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1916308 | Clarification on sCellIndex and SCell lists |
CR revision of R2-1915663 revised to R2-1916323 |
Ericsson, Nokia, Nokia Shanghai Bell, ZTE | 36.331 15.7.0 CR#41601 catF | LTE_CA_enh_b5C-Core | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1916309 | Correction on handling of stored AS context for UP optimization and RRC_INACTIVE state |
CR revision of R2-1915838 |
Huawei, HiSilicon | 36.304 15.4.0 CR#7751 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1916310 | Corrections to Application layer measurement reporting and UE capability signalling |
CR revision of R2-1914715 |
Lenovo, Motorola Mobility | 36.331 15.7.0 CR#41421 catF | LTE_sTTIandPT-Core, TEI15, NR_newRAT-Core, LTE_QMC_Streaming-Core | Rel-15 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1916311 | Correction to full configuration |
CR revision of R2-1915569 revised to R2-1916324 |
Google Inc. | 36.331 15.7.0 CR#41511 catF | LTE_QMC_Streaming-Core | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1916312 | Correction to early measurement reporting results |
CR revision of R2-1915667 revised to R2-1916325 |
Ericsson | 36.331 15.7.0 CR#41611 catF | LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1916313 | Clarification on UE Inactive AS context |
CR revision of R2-1916082 revised to R2-1916626 |
Google Inc. | 36.331 15.7.0 CR#41771 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-108 AI: 4.5.1 |
revised | [WTS] [JSN] |
R2-1916314 | [DRAFT] Reply LS on support of high peak data rate for Cat-M1 Ues in HD-FDD |
LS out LS is reply to R1-1911398 LS To: RAN1 revision of R2-1914771 revised to R2-1916327 |
Qualcomm Incorporated | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
revised | [WTS] [JSN] | |
R2-1916315 | [DRAFT] reply LS on QoE Measurement Collection |
LS out LS is reply to R2-1912061 source LS: S5-195659 LS To: SA5 revision of R2-1914643 revised to R2-1916326 |
Ericsson | QOED | Rel-16 |
R2-108 AI: 7.5 |
revised | [WTS] [JSN] | |
R2-1916316 | Correction on non-3GPP paging |
CR revision of R2-1915843 revised to R2-2002075 |
Huawei, HiSilicon | 36.331 15.7.0 CR#41721 catC | LTE_5GCN_connect-Core, TEI16 | Rel-16 |
R2-108 AI: 7.6 |
endorsed | [WTS] [JSN] |
R2-1916317 | Introduction of DL MIMO efficiency enhancement |
CR revision of R2-1915879 |
Huawei, HiSilicon | 36.306 15.6.0 CR#17251 catB | LTE_DL_MIMO_EE-Core | Rel-16 |
R2-108 AI: 7.8 |
endorsed | [WTS] [JSN] |
R2-1916318 | Introduction of DL MIMO efficiency enhancement |
CR revision of R2-1915880 |
Huawei, HiSilicon | 36.331 15.7.0 CR#41751 catB | LTE_DL_MIMO_EE-Core | Rel-16 |
R2-108 AI: 7.8 |
endorsed | [WTS] [JSN] |
R2-1916319 | Draft CR for 36.323 on supporting DAPS handover |
draftCR revision of R2-1915350 |
Huawei, HiSilicon, Mediatek Inc. | LTE_feMob-Core | Rel-16 |
R2-108 AI: 7.3.2.1.1 |
endorsed | [WTS] [JSN] | |
R2-1916320 | Report of [offline 106] UE capability on NR<E mobility | discussion | Intel Corporation | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.1 |
reserved | [WTS] [JSN] | |
R2-1916321 | Report on Offline Discussion [108] agreeable proposals on Conditional PSCell Addition/Change |
discussion revised to R2-1916329 |
CATT |
R2-108 AI: 6.9.4 |
revised | [WTS] [JSN] | |||
R2-1916322 | Report of [Offline 109] Release of measID for CHO | discussion | Ericsson |
R2-108 AI: 6.9.3.3 |
noted | [WTS] [JSN] | |||
R2-1916323 | Clarification on sCellIndex and SCell lists |
CR revision of R2-1916308 |
Ericsson, Nokia, Nokia Shanghai Bell, ZTE | 36.331 15.7.0 CR#41602 catA | LTE_CA_enh_b5C-Core | Rel-15 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1916324 | Correction to full configuration |
CR revision of R2-1916311 |
Google Inc. | 36.331 15.7.0 CR#41512 catF | LTE_QMC_Streaming-Core | Rel-15 |
R2-108 AI: 4.5.1 |
postponed | [WTS] [JSN] |
R2-1916325 | Correction to early measurement reporting results |
CR revision of R2-1916312 |
Ericsson | 36.331 15.7.0 CR#41612 catF | LTE_euCA-Core | Rel-15 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1916326 | [DRAFT] reply LS on QoE Measurement Collection |
LS out LS is reply to R2-1912061 source LS: S5-195659 LS To: SA5 revision of R2-1916315 revised to R2-1916328 |
Ericsson | QOED | Rel-16 |
R2-108 AI: 7.5 |
revised | [WTS] [JSN] | |
R2-1916327 | Reply LS on support of high peak data rate for Cat-M1 UEs in HD-FDD |
LS out LS is reply to R1-1911398 LS To: RAN1, RAN revision of R2-1916314 |
RAN2 | TEI16 | Rel-16 |
R2-108 AI: 7.6 |
approved | [WTS] [JSN] | |
R2-1916328 | Reply LS on QoE Measurement Collection |
LS out LS is reply to R2-1912061 source LS: S5-195659 LS To: SA5 revision of R2-1916326 |
RAN2 | QOED | Rel-16 |
R2-108 AI: 7.5 |
approved | [WTS] [JSN] | |
R2-1916329 | Report on Offline Discussion [108] agreeable proposals on Conditional PSCell Addition/Change |
discussion revision of R2-1916321 |
CATT |
R2-108 AI: 6.9.4 |
available | [WTS] [JSN] | |||
R2-1916330 | LS on Conditional PSCell addition/change |
LS out LS To: RAN3 |
RAN2 | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.4 |
approved | [WTS] [JSN] | |
R2-1916331 | Introduction of cross link interfernce management |
CR revision of R2-1915881 revised to R2-1916347 |
Huawei, HiSilicon | 38.3 15.7.0 CR#1801 catB | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.1 |
revised | [WTS] [JSN] |
R2-1916332 | [DRAFT] LS on CLI measurements UE capabilities |
LS out LS To: RAN1 revision of R2-1916258 revised to R2-1916348 |
Qualcomm Incorporated | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
revised | [WTS] [JSN] | |
R2-1916333 | Running CR for the introduction of SRVCC from 5G to 3G |
draftCR revision of R2-1916272 |
Huawei, HiSilicon, China Unicom | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.1 |
endorsed | [WTS] [JSN] | |
R2-1916334 | Running CR for the introduction of SRVCC from 5G to 3G |
draftCR revision of R2-1916117 |
China Unicom, Huawei, HiSilicon | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.1 |
endorsed | [WTS] [JSN] | |
R2-1916335 | Introduction of SRVCC from 5G to 3G |
CR revision of R2-1914645 revised to R2-2000325 |
Ericsson | 37.34 15.7.0 CR#1651 catB | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-108 AI: 6.14.3 |
endorsed | [WTS] [JSN] |
R2-1916336 | [DRAFT] Reply LS on NID structure and length |
LS out LS is reply to R2-1914326 LS To: CT4, CT revised to R2-1916344 |
Ericsson | Vertical_LAN | Rel-16 |
R2-108 AI: 6.18.1 |
revised | [WTS] [JSN] | |
R2-1916337 | NPN Stage 2 Draft CR |
draftCR revision of R2-1914599 revised to R2-1916637 |
Nokia (Rapporteur) | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.1 |
revised | [WTS] [JSN] | |
R2-1916338 | Introduction of Cross Link Interference (CLI) handling and Remote Interference Management (RIM) |
CR revision of R2-1916211 revised to R2-1916639 |
LG Electronics Inc | 38.331 15.7.0 CR#14231 catB | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
revised | [WTS] [JSN] |
R2-1916339 | Running RRC CR for Introduction of NR eMIMO |
draftCR revision of R2-1914716 revised to R2-1916343 |
Ericsson | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.2 |
revised | [WTS] [JSN] | |
R2-1916340 | Introduction of cross link interfernce management | draftCR | Huawei, HiSilicon, ZTE Corporation (Rapporteur) | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
endorsed | [WTS] [JSN] | |
R2-1916341 | [Draft] CMAS/ETWS and emergency services for SNPNs |
LS out LS To: SA1, SA2 revised to R2-1916345 |
Qualcomm | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
revised | [WTS] [JSN] | |
R2-1916342 | Report of Offline Discussion 211 (CATT) | discussion | CATT (Rapporteur) |
R2-108 AI: 6.18.2 |
noted | [WTS] [JSN] | |||
R2-1916343 | Running RRC CR for Introduction of NR eMIMO |
draftCR revision of R2-1916339 revised to R2-2001109 |
Ericsson | NR_eMIMO-Core | Rel-16 |
R2-108 AI: 6.16.2 |
available | [WTS] [JSN] | |
R2-1916344 | Reply LS on NID structure and length |
LS out LS is reply to R2-1914326 LS To: CT4 revision of R2-1916336 |
RAN2 | Vertical_LAN, NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.1 |
approved | [WTS] [JSN] | |
R2-1916345 | CMAS/ETWS and emergency services for SNPNs |
LS out LS To: SA1, SA2 revision of R2-1916341 |
RAN2 | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.2 |
approved | [WTS] [JSN] | |
R2-1916346 | Draft Reply LS on Sending CAG ID in NAS layer |
LS out source LS: S3-193142 LS To: SA3, SA2, RAN3 revision of R2-1915804 revised to R2-1916349 |
Qualcomm Incorporated |
R2-108 AI: 6.18.3 |
revised | [WTS] [JSN] | |||
R2-1916347 | Introduction of cross link interfernce management |
CR revision of R2-1916331 |
Huawei, HiSilicon | 38.3 15.7.0 CR#1802 catB | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.1 |
endorsed | [WTS] [JSN] |
R2-1916348 | LS on CLI measurements UE capabilities |
LS out LS To: RAN1 LS reply in R4-2001622, R1-2000509, R1-2000795, R4-2002221 revision of R2-1916332 |
RAN2 | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
approved | [WTS] [JSN] | |
R2-1916349 | Reply LS on Sending CAG ID in NAS layer |
LS out LS is reply to S3-193142 LS To: SA3, SA2, RAN3 revision of R2-1916346 |
RAN2 | NG_RAN_PRN | Rel-16 |
R2-108 AI: 6.18.3 |
approved | [WTS] [JSN] | |
R2-1916350 | Miscellaneous non-controversial corrections Set IV |
CR revision of R2-1915671 revised to R2-1916627 |
Ericsson | 38.331 15.7.0 CR#13232 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
revised | [WTS] [JSN] |
R2-1916351 | [108#06][NTN] Earth fixed vs. Earth moving cells in NTN LEO (Thales) xz | pCR | THALES | 38.821 0.9.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
endorsed | [WTS] [JSN] |
R2-1916352 | MAC Running CR for NR IIOT | draftCR | Samsung R&D Institute UK | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.1 |
endorsed | [WTS] [JSN] | |
R2-1916353 | Correction to channelBWs |
CR revision of R2-1915664 |
Ericsson | 38.306 15.7.0 CR#2021 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1916354 | Running 38.321 CR for NR_L1enh_URLLC |
draftCR revision of R2-1916022 |
Huawei, HiSilicon | NR_L1enh_URLLC-Core | Rel-16 |
R2-108 AI: 6.22.2 |
endorsed | [WTS] [JSN] | |
R2-1916355 | Stage-2 running CR for support of NR Industrial IoT WI | draftCR | Nokia (Rapporteur) | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.1 |
endorsed | [WTS] [JSN] | |
R2-1916356 | Clarification on default configuration and SRB1 for UP-EDT |
CR revision of R2-1915308 revised to R2-2000636 |
Huawei, HiSilicon | 36.331 15.7.0 CR#41043 catF | LTE_eMTC4-Core, NB_IOTenh2-Core | Rel-15 |
R2-108 AI: 4.2 |
postponed | [WTS] [JSN] |
R2-1916357 | [DRAFT] Reply LS on Mobile-terminated Early Data Transmission |
LS out LS is reply to S2-19108041 LS To: SA2, CT1 revision of R2-1915719 revised to R2-1916368 |
Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core, 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.2 |
revised | [WTS] [JSN] | |
R2-1916358 | [DRAFT] LS on UE identifier for UP CIoT 5GS Optimisation |
LS out LS To: RAN3 revised to R2-1916369 |
LGE | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.1.12 |
revised | [WTS] [JSN] | |
R2-1916359 | Summary of [CB Offline #303] on HARQ RTT timer length | discussion | Huawei, HiSilicon |
R2-108 AI: 7.1.5 |
noted | [WTS] [JSN] | |||
R2-1916360 | Reply LS on extended NAS timers for CE in 5GS |
LS out source LS: R2-1916360 LS To: CT1 revised to R2-1916623 |
Ericsson | LTE_eMTC5-Core, NB_IOTenh3-Core, 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.1 |
revised | [WTS] [JSN] | |
R2-1916361 | Introduction of Rel-16 eMTC enhancements |
CR revision of R2-1914860 |
Intel Corporation | 36.3 15.7.0 CR#12513 catB | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
endorsed | [WTS] [JSN] |
R2-1916362 | Running CR on 36.321 for eMTC |
draftCR revision of R2-1915393 |
Ericsson | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
endorsed | [WTS] [JSN] | |
R2-1916363 | Introduction of additional enhancements for eMTC |
CR revision of R2-1915609 revised to R2-2000305 |
Qualcomm Incorporated | 38.3 15.7.0 CR#1752 catB | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
endorsed | [WTS] [JSN] |
R2-1916364 | Introduction of Rel-16 eMTC enhancements |
draftCR revision of R2-1915717 revised to R2-2000433 |
Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
endorsed | [WTS] [JSN] | |
R2-1916365 | Running CR for 36.304 -Rel-16 eMTC Enhancements |
draftCR revision of R2-1914050 |
Nokia | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
endorsed | [WTS] [JSN] | |
R2-1916366 | Running 36.302 CR for R16 eMTC | draftCR | ZTE Corporation | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
endorsed | [WTS] [JSN] | |
R2-1916367 | (reserved) | other | Emre's tdocs |
R2-108 AI: 9 |
reserved | [WTS] [JSN] | |||
R2-1916368 | Reply LS on Mobile-terminated Early Data Transmission |
LS out LS is reply to S2-19108041 LS To: SA2, CT1 revision of R2-1916357 |
RAN2 | LTE_eMTC5-Core, NB_IOTenh3-Core, 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.2 |
approved | [WTS] [JSN] | |
R2-1916369 | LS on UE identifier for UP CIoT 5GS Optimisation |
LS out LS To: RAN3 revision of R2-1916358 |
RAN2 | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.1.12 |
approved | [WTS] [JSN] | |
R2-1916370 | (reserved) | other | Emre's tdocs |
R2-108 AI: 9 |
reserved | [WTS] [JSN] | |||
R2-1916371 | Draft LS on consistent Uplink LBT failure detection mechanism |
LS out LS To: RAN1 revision of R2-1914864 revised to R2-1916380 |
Qualcomm Incorporated | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
revised | [WTS] [JSN] | |
R2-1916372 | Summary of offline 404 discussion |
discussion revised to R2-1916381 |
Qualcomm Incorporated | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.1 |
revised | [WTS] [JSN] | |
R2-1916373 | [Draft] Reply LS on UE higher layer signalling for cross-slot scheduling |
LS out source LS: R1-1911586 LS To: RAN1 revision of R2-1914307 |
MediaTek Inc. | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.1 |
noted | [WTS] [JSN] | |
R2-1916374 | Running CR for Introduction of Rel-16 NR UE power saving in TS 38.321 | draftCR | Huawei | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.2 |
noted | [WTS] [JSN] | |
R2-1916375 | LS on RRM Measurement Relaxation for UE Power Saving in NR |
LS out LS To: RAN4 |
RAN2 | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.6 |
approved | [WTS] [JSN] | |
R2-1916376 | [107bis#66][NR/NTN] Running TP (Thales) |
pCR revision of R2-1914632 |
THALES | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.1 |
agreed | [WTS] [JSN] |
R2-1916377 | [DRAFT] LS on dependencies on AS design for mobility management aspects of NTN in 5GS |
LS out LS is reply to S2-1910786 LS To: SA2, RAN3 revised to R2-1916394 |
Thales | FS_5GSAT_ARCH | Rel-16 |
R2-108 AI: 6.6.1 |
revised | [WTS] [JSN] | |
R2-1916378 | [DRAFT] LS on LS on system level design assumptions for satellite in 5GS |
LS out LS is reply to S2-1910787 LS To: SA2, RAN3 revised to R2-1916395 |
Thales | FS_5GSAT_ARCH | Rel-16 |
R2-108 AI: 6.6.1 |
revised | [WTS] [JSN] | |
R2-1916379 | Inputs to TR 38.821 recommendations |
pCR revision of R2-1914633 revised to R2-1916396 |
THALES, Nomor, Nokia, Vodafone, Mediatek | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.1 |
revised | [WTS] [JSN] |
R2-1916380 | LS on consistent Uplink LBT failure detection mechanism |
LS out LS To: RAN1 LS reply in R1-2001397 revision of R2-1916371 |
RAN2 | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.2.2 |
approved | [WTS] [JSN] | |
R2-1916381 | Summary of offline 404 discussion |
discussion revision of R2-1916372 |
Qualcomm Incorporated | NR_unlic-Core | Rel-16 |
R2-108 AI: 6.2.3.1 |
noted | [WTS] [JSN] | |
R2-1916382 | Report of offline-403 - Remaining issues of consistent UL LBT failure | discussion | OPPO |
R2-108 AI: 6.2.2.2 |
noted | [WTS] [JSN] | |||
R2-1916383 | DRX adaptions for NTN |
discussion revision of R2-1915566 revised to R2-1916415 |
Ericsson, Nomor Research GmbH, THALES | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1916384 | UE positioning requirements and solution analysis in NTN |
discussion revision of R2-1916241 |
Nokia, Nokia Shanghai Bell, Thales | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4 |
noted | [WTS] [JSN] | |
R2-1916385 | Discussion on Earth fixed vs. Earth moving cells in NTN LEO |
discussion revision of R2-1916240 |
Nokia, Nokia Shanghai Bell, Thales | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1916386 | TP on Feeder Link Switch |
pCR revision of R2-1914494 revised to R2-1916555 |
CATT, Huawei, HiSilicon | 38.821 0.9.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
revised | [WTS] [JSN] |
R2-1916387 | Service continuity between TN and NTN |
discussion revision of R2-1914974 |
NEC |
R2-108 AI: 6.6.4.1 |
noted | [WTS] [JSN] | |||
R2-1916388 | Remaining details on Random access for NTN |
discussion revision of R2-1915567 revised to R2-1916414 |
Ericsson | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1916389 | Satellite type differentiation |
discussion revision of R2-1915084 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.2 |
noted | [WTS] [JSN] | |
R2-1916390 | CHO for NTN LEO |
pCR revision of R2-1914719 revised to R2-1916393 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
revised | [WTS] [JSN] |
R2-1916391 | Report of email discussion [107bis#67] [NR - NTN] |
pCR revision of R2-1914763 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.3 |
available | [WTS] [JSN] |
R2-1916392 | TP on RACH capacity calculation based on typical cell size |
draftCR revision of R2-1915081 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
agreed | [WTS] [JSN] | |
R2-1916393 | CHO for NTN LEO |
pCR revision of R2-1916390 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
agreed | [WTS] [JSN] |
R2-1916394 | LS on dependencies on AS design for mobility management aspects of NTN in 5GS |
LS out LS is reply to S2-1910786 LS To: SA2, RAN3 revision of R2-1916377 revised to R2-1916470 |
RAN2 | FS_5GSAT_ARCH | Rel-16 |
R2-108 AI: 6.6.1 |
revised | [WTS] [JSN] | |
R2-1916395 | LS on LS on system level design assumptions for satellite in 5GS |
LS out LS is reply to S2-1910787 LS To: SA2, RAN3 revision of R2-1916378 revised to R2-1916620 |
RAN2 | FS_5GSAT_ARCH | Rel-16 |
R2-108 AI: 6.6.1 |
revised | [WTS] [JSN] | |
R2-1916396 | Inputs to TR 38.821 recommendations |
pCR revision of R2-1916379 revised to R2-1916397 |
THALES, Nomor, Nokia, Vodafone, Mediatek | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.1 |
revised | [WTS] [JSN] |
R2-1916397 | Inputs to TR 38.821 recommendations |
pCR revision of R2-1916396 |
THALES, Nomor, Nokia, Vodafone, Mediatek | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.1 |
agreed | [WTS] [JSN] |
R2-1916398 | Correction to PHR in dual connectivity |
CR revision of R2-1916173 |
Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | 36.321 15.7.0 CR#1462 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
agreed | [WTS] [JSN] |
R2-1916399 | Correction for the establishment of LTE RLC bearers for (NG)EN-DC and NE-DC |
CR revision of R2-1915589 |
Huawei, HiSilicon | 36.331 15.7.0 CR#4185 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1916400 | Clarification regarding QoS handling in MRDC with 5G CN |
CR revision of R2-1915709 |
Samsung, ZTE Corporation | 37.34 15.7.0 CR#1681 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1916401 | UE capability on NR positioning | discussion | Intel Corporation | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
withdrawn | [WTS] [JSN] | |
R2-1916402 | [Report of Offline#502] | report | Ericsson | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
noted | [WTS] [JSN] | |
R2-1916403 | Summary of Offline discussion #503 on whether to have one method or follow the existing LTE structure |
discussion revised to R2-1916533 |
CATT | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
revised | [WTS] [JSN] | |
R2-1916404 | [Report of Offline#504] | report | Ericsson | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
withdrawn | [WTS] [JSN] | |
R2-1916405 | Introduction of B1C signal in BDS system in A-GNSS |
CR revision of R2-1914471 |
CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | 36.355 15.5.0 CR#2481 catB | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
reserved | [WTS] [JSN] |
R2-1916406 | CR of TS 36.355 for introducing NavIC in LTE |
CR revision of R2-1916293 revised to R2-2000153 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs Private Limited, Tejas Networks Ltd., Qualcomm Incorporated | 36.355 15.5.0 CR#2474 catB | LCS_NAVIC | Rel-16 |
R2-108 AI: 7.7 |
endorsed | [WTS] [JSN] |
R2-1916407 | CR of TS 36.331 for introducing NavIC in LTE |
CR revision of R2-1916294 revised to R2-2000157 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs Private Limited, Tejas Networks Ltd., Qualcomm Incorporated | 36.331 15.7.0 CR#41373 catB | LCS_NAVIC | Rel-16 |
R2-108 AI: 7.7 |
endorsed | [WTS] [JSN] |
R2-1916408 | CR of TS 36.305 for introducing NavIC in LTE |
CR revision of R2-1914766 revised to R2-2000158 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | 36.305 15.4.0 CR#842 catB | LCS_NAVIC | Rel-16 |
R2-108 AI: 7.7 |
endorsed | [WTS] [JSN] |
R2-1916409 | SSR Phase Bias Positioning Modes for Stage 2 | draftCR | Swift Navigation | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.2 |
endorsed | [WTS] [JSN] | |
R2-1916410 | SSR Phase Bias Positioning Modes for Stage 2 | draftCR | Swift Navigation | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.2 |
withdrawn | [WTS] [JSN] | |
R2-1916411 | Introducing support for GNSS Integer Ambiguity Level Indications |
draftCR revised to R2-1916412 |
Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.8.2.2 |
revised | [WTS] [JSN] | |
R2-1916412 | Introducing support for GNSS Integer Ambiguity Level Indications |
draftCR revision of R2-1916411 revised to R2-2001256 |
Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.8.2.2 |
endorsed | [WTS] [JSN] | |
R2-1916413 | Missing RACH aspect for DC |
CR revision of R2-1915884 |
Nokia, Nokia Shanghai Bell, ZTE Corporation (Rapporteur) | 37.34 15.7.0 CR#1691 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1916414 | Remaining details on Random access for NTN |
pCR revision of R2-1916388 |
Ericsson | 38.821 0.9.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
endorsed | [WTS] [JSN] |
R2-1916415 | DRX adaptions for NTN |
pCR revision of R2-1916383 |
Ericsson | 38.821 0.9.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
endorsed | [WTS] [JSN] |
R2-1916416 | [DRAFT] LS on trace related configurations for NR MDT |
LS out LS To: SA5 revised to R2-1916598 |
Huawei | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
revised | [WTS] [JSN] | |
R2-1916417 | [DRAFT] LS on EN-DC related MDT configuration details |
LS out LS To: RAN3, SA5 revised to R2-1916579 |
Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
revised | [WTS] [JSN] | |
R2-1916418 | [DRAFT]LS on Logged Measurements |
LS out LS To: RAN4 revision of R2-1915988 revised to R2-1916588 |
CMCC | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
revised | [WTS] [JSN] | |
R2-1916419 | RAN2-108#661 offline discussion on SON functions | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
noted | [WTS] [JSN] | |
R2-1916420 | [DRAFT] LS on RACH report and RLF report |
LS out LS To: RAN3, SA5 revised to R2-1916580 |
Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
revised | [WTS] [JSN] | |
R2-1916421 | Clarification of PDCCH monitoring when not fully aligned with PDCCH periods |
CR revision of R2-1914482 revised to R2-1916439 |
NTT DOCOMO INC. | 36.321 15.7.0 CR#14591 catF | NB_IOTenh2-Core | Rel-15 |
R2-108 AI: 4.1 |
revised | [WTS] [JSN] |
R2-1916422 | Stop using redirectedCarrierOffsetDedicated after reselection to another frequency |
CR revision of R2-1915297 |
Huawei, HiSilicon | 36.331 15.7.0 CR#41441 catF | NB_IOTenh-Core, TEI15 | Rel-15 |
R2-108 AI: 4.1 |
agreed | [WTS] [JSN] |
R2-1916423 | Allow Delta Configuration of ParametersListFmt2 and ParametersListEDTFmt2 in SIB2-NB |
CR revision of R2-1914894 |
MediaTek Inc., ZTE Corporation, Sanechips, Huawei, HiSilicon | 36.331 15.7.0 CR#41431 catF | NB_IOTenh2-Core | Rel-15 |
R2-108 AI: 4.1 |
agreed | [WTS] [JSN] |
R2-1916424 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC | other | Blackberry | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
endorsed | [WTS] [JSN] | |
R2-1916425 | [DRAFT] LS on PUR Fallback |
LS out LS To: RAN1 revised to R2-1916434 |
Qualcomm | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
revised | [WTS] [JSN] | |
R2-1916426 | Draft LS reply PUR transmission for NB-IoT/eMTC |
LS out LS is reply to R2-1914304 LS To: RAN1 revision of R2-1915409 revised to R2-1916435 |
Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.4 |
revised | [WTS] [JSN] | |
R2-1916427 | Alternative TP for TA validation based on serving cell RSRP change (related to RAN4 LSes) |
draftCR revised to R2-2000443 |
Sierra Wireless | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
available | [WTS] [JSN] | |
R2-1916428 | [Report from Offline discussion #700] | discussion | Qualcomm |
R2-108 AI: 4.1 |
withdrawn | [WTS] [JSN] | |||
R2-1916429 | [Report from Offline discussion #701] | discussion | Qualcomm |
R2-108 AI: 7.2.3 |
noted | [WTS] [JSN] | |||
R2-1916430 | Offline discussion #702 (Qualcomm) To discuss the configuration details and agree way forward | discussion | Qualcomm Incorporated |
R2-108 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R2-1916431 | Report of [Offline#705] Further progress on PUR | discussion | Ericsson (Rapporteur) |
R2-108 AI: 7.2.4 |
noted | [WTS] [JSN] | |||
R2-1916432 | Report of [Offline#706] whether to re-use SIB14-NB or have new SIB for UAC | discussion | Huawei (Rapporteur) |
R2-108 AI: 7.2. |
noted | [WTS] [JSN] | |||
R2-1916433 | [DRAFT] Reply LS on assistance indication for WUS |
LS out LS is reply to R2-1914346 LS To: SA2, CT1, RAN3 revision of R2-1915614 revised to R2-1916436 |
Qualcomm Incorporated | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.3 |
revised | [WTS] [JSN] | |
R2-1916434 | [DRAFT] Feedback on RAN1 agreements on PUR |
LS out LS To: RAN1 revision of R2-1916425 revised to R2-1916437 |
Qualcomm | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
revised | [WTS] [JSN] | |
R2-1916435 | LS reply PUR transmission for NB-IoT/eMTC |
LS out LS is reply to R2-1914304 LS To: RAN1 revision of R2-1916426 |
RAN2 | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.4 |
approved | [WTS] [JSN] | |
R2-1916436 | [DRAFT] Reply LS on assistance indication for WUS |
LS out LS is reply to R2-1914346 LS To: SA2, CT1, RAN3 revision of R2-1916433 revised to R2-1916438 |
Qualcomm Incorporated | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.3 |
revised | [WTS] [JSN] | |
R2-1916437 | Feedback on RAN1 agreements on PUR |
LS out LS To: RAN1 revision of R2-1916434 |
RAN2 | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.4 |
approved | [WTS] [JSN] | |
R2-1916438 | [DRAFT] Reply LS on assistance indication for WUS |
LS out LS is reply to R2-1914346 LS To: SA2, CT1, RAN3 revision of R2-1916436 revised to R2-1916440 |
Qualcomm Incorporated | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.3 |
revised | [WTS] [JSN] | |
R2-1916439 | Clarification of PDCCH monitoring when not fully aligned with PDCCH periods |
CR revision of R2-1916421 |
NTT DOCOMO INC. | 36.321 15.7.0 CR#14592 catF | NB_IOT-Core, TEI15 | Rel-15 |
R2-108 AI: 4.1 |
agreed | [WTS] [JSN] |
R2-1916440 | Reply LS on assistance indication for WUS |
LS out LS is reply to R2-1914346 LS To: SA2, CT1, RAN3 revision of R2-1916438 |
RAN2 | NB_IOTenh3-Core, LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.2.3 |
approved | [WTS] [JSN] | |
R2-1916441 | Reply LS on signalling of sidelink RSRP and CSI |
LS out LS To: RAN1 revised to R2-1916457 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1916442 | [DRAFT] Response LS on SL RLM/RLF |
LS out LS To: RAN1, SA2 revised to R2-1916464 |
InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1916443 | [DRAFT] Response LS on additional high layer information for sidelink physical layer operations |
LS out LS is reply to R2-1914322 LS To: RAN1 revised to R2-1916458 |
LGE | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1916444 | [DRAFT] Reply LS on resource coordination between NG-RAN nodes for NR V2X sidelink communication |
LS out LS is reply to R2-1914330 source LS: R3-196280 LS To: RAN3 revision of R2-1915376 revised to R2-1916459 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1916445 | [DRAFT] Reply LS on sidelink synchronization under multiple synchronization sources with different timing |
LS out LS To: RAN4, RAN1 revised to R2-1916465 |
Qualcomm | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1916446 | [DRAFT] Reply LS on PC5S and PC5 RRC unicast message protection |
LS out LS is reply to R2-1914357 LS To: SA3 revised to R2-1916461 |
Qualcomm Incorporated | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1916447 | Offline discussion on open issues of V2X 38.331 running CR | discussion | Huawei | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1916448 | [DRAFT] Response LS on TX resource (re-)selection and MAC related agreements |
LS out LS is reply to R1-1911746 LS To: RAN1 revised to R2-1916460 |
LGE | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1916449 | Running CR for 38.322 for NR V2X |
draftCR revision of R2-1915380 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1916450 | [Results of Offline#810] | discussion | OPPO | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1916451 | [Discussion on remaining prioritization issues] | discussion | OPPO | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1916452 | Summary of offline [Offline-812] on HFN part of RX_NEXT and RX_DELIV | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1916453 | [DRAFT] LS on NR V2X Security issue and PDCP SN size |
LS out LS To: SA3 revised to R2-1916463 |
CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
revised | [WTS] [JSN] | |
R2-1916454 | Summary of offline [814] on sidelink transmissions during handover or Uu Phy layer problems | discussion | Nokia, Nokia Shanghai Bell |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
R2-1916455 | Summary on Offline [815] SL Synchronization under Async eNB(s)/gNB(s) | discussion | Apple |
R2-108 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
R2-1916456 | Open issues on V2X 38.322 running CR | discussion | Ericsson |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |||
R2-1916457 | Reply LS on signalling of sidelink RSRP and CSI |
LS out LS is reply to R1-1911698 LS To: RAN1 LS reply in R1-1913693 revision of R2-1916441 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
approved | [WTS] [JSN] | |
R2-1916458 | Response LS on additional high layer information for sidelink physical layer operations |
LS out LS is reply to R2-1914322 LS To: RAN1 LS reply in R1-1913694 revision of R2-1916443 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
approved | [WTS] [JSN] | |
R2-1916459 | Reply LS on resource coordination between NG-RAN nodes for NR V2X sidelink communication |
LS out LS is reply to R2-1914330 source LS: R3-196280 LS To: RAN3 revision of R2-1916444 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
approved | [WTS] [JSN] | |
R2-1916460 | Response LS on TX resource (re-)selection and MAC related agreements |
LS out LS is reply to R1-1911746 LS To: RAN1 LS reply in R1-1913695 revision of R2-1916448 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
approved | [WTS] [JSN] | |
R2-1916461 | Reply LS on PC5S and PC5 RRC unicast message protection |
LS out LS is reply to R2-1914357 LS To: SA3 revision of R2-1916446 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
approved | [WTS] [JSN] | |
R2-1916462 | [DRAFT] Reply LS on UL-SL prioritization |
LS out LS is reply to R2-1914318 LS To: RAN1, RAN4 revised to R2-1916466 |
OPPO | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
revised | [WTS] [JSN] | |
R2-1916463 | [DRAFT] LS on NR V2X Security issue and PDCP SN size |
LS out LS To: SA3 revision of R2-1916453 revised to R2-1916467 |
CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
revised | [WTS] [JSN] | |
R2-1916464 | Response LS on SL RLM/RLF |
LS out LS To: RAN1, SA2 revision of R2-1916442 revised to R2-1916621 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1916465 | Reply LS on sidelink synchronization under multiple synchronization sources with different timing |
LS out LS is reply to R2-1914340 LS To: RAN4, RAN1 LS reply in R1-1913696 revision of R2-1916445 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
approved | [WTS] [JSN] | |
R2-1916466 | [DRAFT] Reply LS on UL-SL prioritization |
LS out LS is reply to R2-1914318 LS To: RAN1, RAN4 revision of R2-1916462 revised to R2-1916468 |
OPPO | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
revised | [WTS] [JSN] | |
R2-1916467 | LS on NR V2X Security issue and PDCP SN size |
LS out LS To: SA3 revision of R2-1916463 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
approved | [WTS] [JSN] | |
R2-1916468 | Reply LS on UL-SL prioritization |
LS out LS is reply to R2-1914318 LS To: RAN1, RAN4 LS reply in R1-2000788, R1-2002677 revision of R2-1916466 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.2 |
approved | [WTS] [JSN] | |
R2-1916469 | Ericsson (Email discussion rapporteur) | pCR | Ericsson LM | 38.821 0.9.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.3 |
endorsed | [WTS] [JSN] |
R2-1916470 | LS on dependencies on AS design for mobility management aspects of NTN in 5GS |
LS out LS is reply to S2-1910786 LS To: SA2, RAN3 revision of R2-1916394 |
RAN2 | FS_5GSAT_ARCH | Rel-16 |
R2-108 AI: 6.6.1 |
approved | [WTS] [JSN] | |
R2-1916471 | Correction on sending Failure Information via SRB3 |
CR revision of R2-1915365 |
Ericsson, ZTE Corporation (Rapporteur), Huawei | 37.34 15.7.0 CR#1593 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1916472 | Running stage 2 CR on positioning ( [107bis#78][NR Pos] ) |
draftCR revision of R2-1914727 revised to R2-2000473 |
Intel Corporation, ESA | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.1 |
available | [WTS] [JSN] | |
R2-1916473 | SMTC setting for NR PSCell change in MR-DC |
CR revision of R2-1915505 |
Nokia, Nokia Shanghai Bell | 37.34 15.7.0 CR#1573 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1916474 | Correction to integrity protection in DRB addition and modification |
CR revision of R2-1915362 |
Ericsson | 38.331 15.7.0 CR#13092 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1916475 | On performing L3 filtering for NR related measurements |
CR revision of R2-1915426 |
Ericsson | 36.331 15.7.0 CR#41481 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1916476 | Corrections on scg-RB-Config in CG-Config |
CR revision of R2-1915354 |
Ericsson | 38.331 15.7.0 CR#13012 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1 |
agreed | [WTS] [JSN] |
R2-1916477 | Draft LS to RAN1 for clarification of PUCCH configuration |
LS out LS To: RAN1 revision of R2-1915593 revised to R2-1916481 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
revised | [WTS] [JSN] | |
R2-1916478 | Broadcast Positioning Procedure in Connected Mode |
discussion revision of R2-1914469 |
CATT | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.3.2 |
available | [WTS] [JSN] | |
R2-1916479 | Correction on the condition of RBTermChange |
CR revision of R2-1915366 |
Ericsson | 38.331 15.7.0 CR#13691 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.2 |
agreed | [WTS] [JSN] |
R2-1916480 | Correction on the configuration of split SRB |
CR revision of R2-1915483 |
Huawei, HiSilicon, Samsung | 38.331 15.7.0 CR#13751 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.2 |
agreed | [WTS] [JSN] |
R2-1916481 | LS to RAN1 for clarification of PUCCH configuration |
LS out LS To: RAN1 LS reply in R1-2000353, R1-2000947, R1-2001116, R1-2001306 revision of R2-1916477 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
approved | [WTS] [JSN] | |
R2-1916482 | LS on Discussion over UE capabilities of FG2-36/2-40/2-41/2-43 (R1-1913295; contact: Huawei) |
LS in source LS: R1-1913295 LS To: RAN2 LS reply in R2-2002415 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
noted | [WTS] [JSN] | |
R2-1916483 | Correction to key derivation for the UE configured with sk-counter |
CR revision of R2-1915577 revised to R2-1916629 |
Huawei, HiSilicon | 38.331 15.7.0 CR#13811 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
revised | [WTS] [JSN] |
R2-1916484 | Correction on the pre-condition for reconfiguration with sync of SCG |
CR revision of R2-1915579 |
Huawei, HiSilicon | 38.331 15.7.0 CR#13831 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
agreed | [WTS] [JSN] |
R2-1916485 | Restoring SDAP and RoHC contexts during Resumption |
CR revision of R2-1914746 |
Intel | 38.331 15.7.0 CR#13571 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.6 |
agreed | [WTS] [JSN] |
R2-1916486 | Security requirements for split PDU session (38.331) |
CR revision of R2-1915683 revised to R2-1916589 |
Ericsson, Qualcomm | 38.331 15.7.0 CR#14031 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.8 |
revised | [WTS] [JSN] |
R2-1916487 | Additional path reporting for downlink NR positioning measurements |
discussion revision of R2-1915651 |
Ericsson, T-Mobile, Nokia, Nokia Shanghai Bell, Deutsche Telekom, Polaris Wireless |
R2-108 AI: 6.8.2.1 |
available | [WTS] [JSN] | |||
R2-1916488 | Definition of NR standalone |
CR revision of R2-1915673 |
Ericsson | 38.331 15.7.0 CR#13243 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
postponed | [WTS] [JSN] |
R2-1916489 | Correction of UE assistance information |
CR revision of R2-1915707 revised to R2-1916632 |
Samsung Telecommunications | 38.331 15.7.0 CR#14051 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
revised | [WTS] [JSN] |
R2-1916490 | Correction of UE assistance information |
CR revision of R2-1915708 revised to R2-2001157 |
Samsung Telecommunications | 36.331 15.7.0 CR#41641 catF | NR_newRAT-Core | Rel-16 |
R2-108 AI: 5.4.1.3.11 |
endorsed | [WTS] [JSN] |
R2-1916491 | Correction on SIB1 description |
CR revision of R2-1915594 |
Huawei, HiSilicon | 38.331 15.7.0 CR#13891 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R2-1916492 | IAB flow control feedback info |
discussion revision of R2-1914831 |
Qualcomm Incorporated | Rel-16 |
R2-108 AI: 6.1.3.3 |
noted | [WTS] [JSN] | ||
R2-1916493 | Clarification regarding inter-node transfer of UE capability containers |
CR revision of R2-1915710 |
Samsung Telecommunications | 38.331 15.7.0 CR#14061 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
agreed | [WTS] [JSN] |
R2-1916494 | Miscellaneous corrections for late drop |
CR revision of R2-1915370 |
Ericsson | 36.331 15.7.0 CR#41173 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.2 |
agreed | [WTS] [JSN] |
R2-1916495 | [107bis#34]Correction on ambiguity of UE FDD&TDD FR1&FR2 capabilities |
CR revision of R2-1914911 revised to R2-1916571 |
ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | 38.331 15.7.0 CR#13591 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1916496 | [DRAFT] LS on default codebook parameters |
LS out LS To: RAN1 revised to R2-1916592 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
revised | [WTS] [JSN] | |
R2-1916497 | Issue related to CG overridden by PDCCH |
discussion revision of R2-1916044 |
ASUSTeK | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
noted | [WTS] [JSN] | |
R2-1916498 | Report for [107bis#36] [NR R15] FR2 CA Fallbacks (Nokia) |
discussion revision of R2-1915507 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
postponed | [WTS] [JSN] | |
R2-1916499 | Report of Offline#26, absence of scs-XXkHz in channelBWs-DL/UL | discussion | Ericsson |
R2-108 AI: 5.4.4 |
available | [WTS] [JSN] | |||
R2-1916500 | CR to 38.331 on support of 70MHz channel bandwidth -option1 with IODT bit |
CR revision of R2-1915895 revised to R2-2001313 |
Huawei, HiSilicon, Vodafone | 38.331 15.7.0 CR#14101 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1916501 | CR to 38.306 on support of 70MHz channel bandwidth -option1 with IODT bit |
CR revision of R2-1915896 revised to R2-2001314 |
Huawei, HiSilicon, Vodafone | 38.306 15.7.0 CR#2091 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1916502 | Use of splitSRB-WithOneUL-Path capability (38.306) |
CR revision of R2-1915684 |
Ericsson | 38.306 15.7.0 CR#2041 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1916503 | [DRAFT] LS on Uplink skipping |
LS out LS To: RAN1 revised to R2-1916572 |
vivo | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
revised | [WTS] [JSN] | |
R2-1916504 | Upper layer parameters to support IAB physical layer operation | discussion | Qualcomm (Rapporteur) |
R2-108 AI: 6.1.1 |
available | [WTS] [JSN] | |||
R2-1916505 | TP on Random Access procedure |
draftCR revision of R2-1914498 |
CATT, Thales, OPPO, Spreadtrum Communications, Nomor Research GmbH | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.3.1 |
available | [WTS] [JSN] | |
R2-1916506 | F1AP signalling over LTE leg way forward | discussion | Nokia, Nokia Shanghai Bell, AT&T, KDDI | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
noted | [WTS] [JSN] | |
R2-1916507 | Miscellaneous corrections on UE capability fields |
CR revision of R2-1914577 |
Intel Corporation, NTT DoCoMo | 38.306 15.7.0 CR#1863 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1916508 | Measurement Initiation Issue for NTN System |
discussion revision of R2-1914495 revised to R2-1916521 |
CATT, Thales | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
revised | [WTS] [JSN] | |
R2-1916509 | [DRAFT] LS on secondary DRX group |
LS out LS To: RAN1 revised to R2-1916597 |
Ericsson | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
revised | [WTS] [JSN] | |
R2-1916510 | Miscellaneous Corrections |
CR revision of R2-1914570 |
Qualcomm Incorporated, Ericsson | 38.304 15.5.0 CR#1392 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R2-1916511 | Offline 34, IAB bootstrap configuration | discussion | Qualcomm Incorporated (Rapporteur) | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.2 |
noted | [WTS] [JSN] | |
R2-1916512 | Motivation for a dedicated mechanism for misaligned periodicities handling | discussion | Nokia, Nokia Shanghai Bell, Sequans, Fujitsu | NR_IIOT |
R2-108 AI: 6.7.2.2.1 |
available | [WTS] [JSN] | ||
R2-1916513 | Handling of AS-Config in HandoverPreparationInformation |
CR revision of R2-1915353 |
Ericsson | 38.331 15.7.0 CR#13002 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5 |
agreed | [WTS] [JSN] |
R2-1916514 | Correction of SRB3 handling at full configuration (Alt2) |
CR revision of R2-1915361 |
Ericsson | 38.331 15.7.0 CR#13083 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5 |
agreed | [WTS] [JSN] |
R2-1916515 | Reply LS on Fast MCG Link Recovery using SRB3 (R3-197606; contact: ZTE) |
LS in source LS: R3-197606 LS To: RAN2 |
RAN3 | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.1 |
available | [WTS] [JSN] | |
R2-1916516 | Reply LS on Recommended Bit Rate/Query for FLUS and MTSI |
LS out LS is reply to S4-191031 LS To: SA4 revision of R2-1915713 |
RAN2 | E_FLUS | Rel-16 |
R2-108 AI: 6.19 |
approved | [WTS] [JSN] | |
R2-1916517 | Reply LS on direct indication of ETWS/CMAS (R1-1913367; contact: Futurewei) |
LS in source LS: R1-1913367 LS To: RAN2 |
RAN1 | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1916518 | Running CR for 36.300 on CA/DC Enhancements |
draftCR revision of R2-1915279 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1916519 | Running CR for 38.300 for CA/DC Enhancements |
draftCR revision of R2-1915280 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1916520 | Reply LS on Sending CAG ID in NAS layer (R3-197591; contact: Ericsson) |
LS in source LS: R3-197591 LS To: SA3, SA2, RAN2 |
RAN3 | NG_RAN_PRN | Rel-16 |
R2-108 AI: 6.18.1 |
available | [WTS] [JSN] | |
R2-1916521 | Measurement Initiation Issue for NTN System |
discussion revision of R2-1916508 |
CATT, Thales | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
available | [WTS] [JSN] | |
R2-1916522 | Running CR on 38.331 for on-demand SI procedure in RRC_CONNECTED |
draftCR revision of R2-1915375 revised to R2-1916591 |
Ericsson | NR_unlic-Core, 5G_V2X_NRSL-Core, NR_IIOT-Core, LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.21 |
revised | [WTS] [JSN] | |
R2-1916523 | Correction to Feature Set Combination and Band combination list for NR-DC (38.331) |
CR revision of R2-1915682 |
Ericsson | 38.331 15.7.0 CR#14021 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
agreed | [WTS] [JSN] |
R2-1916524 | [DRAFT] LS on measurement reporting criteria for EN-DC |
LS out LS To: RAN4 revised to R2-1916595 |
Nokia | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.3 |
revised | [WTS] [JSN] | |
R2-1916525 | Correction on MCG measurements in SCGFailureInformation |
CR revision of R2-1915363 |
Ericsson | 38.331 15.7.0 CR#13052 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.3 |
agreed | [WTS] [JSN] |
R2-1916526 | Summary of Offline 52: TP for LCH-priority based Data-Data and SR-Data prioritization | draftCR | Samsung | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.3.2 |
noted | [WTS] [JSN] | |
R2-1916527 | [Summary of] Offline 53, CG/SPS configuration and MAC CE for confirmation | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT |
R2-108 AI: 6.7.2.2.1 |
noted | [WTS] [JSN] | ||
R2-1916528 | Reply LS on CSI-RS configuration transfer |
LS out LS is reply to R2-1914332 LS To: RAN3 LS reply in R3-200771 revision of R2-1914670 |
RAN2 | TEI16 | Rel-16 |
R2-108 AI: 6.20.3 |
approved | [WTS] [JSN] | |
R2-1916529 | Restoring SDAP and RoHC contexts during Resumption | CR | Intel | 36.331 15.7.0 CR#4183 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1916530 | LS on RRC establishment cause value in EPS voice fallback from NR to E-UTRAN |
LS out LS To: CT1 revision of R2-1915035 |
RAN2 | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
approved | [WTS] [JSN] | |
R2-1916531 | Summary of offline #40 on UE autonomous (re)transmission | discussion | CATT |
R2-108 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |||
R2-1916532 | Offline discussion about Power control for NR-DC | discussion | vivo | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.2 |
available | [WTS] [JSN] | |
R2-1916533 | Summary of Offline discussion #503 on whether to have one method or follow the existing LTE structure |
discussion revision of R2-1916403 |
CATT | NR_pos-Core | Rel-16 |
R2-108 AI: 6.8.2.1 |
reserved | [WTS] [JSN] | |
R2-1916534 | Correction to AS security key update |
CR revision of R2-1915358 |
Ericsson | 36.331 15.7.0 CR#41451 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
agreed | [WTS] [JSN] |
R2-1916535 | Correction to AS security key derivation |
CR revision of R2-1915359 |
Ericsson | 38.331 15.7.0 CR#13681 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
agreed | [WTS] [JSN] |
R2-1916536 | Reply LS on SL RLM/RLF (R1-1913464; contact: InterDigital) |
LS in source LS: R1-1913464 LS To: RAN2 |
RAN1 | 5G_V2X_NRSL | Rel-16 |
R2-108 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1916537 | Way forward and TP for the pre-BSR |
draftCR revision of R2-1915459 |
Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.1 |
endorsed | [WTS] [JSN] | |
R2-1916538 | TP for Timing Delta MAC CE | draftCR | ZTE | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.4.3 |
endorsed | [WTS] [JSN] | |
R2-1916539 | Running CR to 38.321 on Integrated Access and Backhaul for NR |
CR revision of R2-1915256 |
Samsung Electronics GmbH | 38.321 15.7.0 CR#6771 catB | NR_IAB | Rel-16 |
R2-108 AI: 6.1.1 |
endorsed | [WTS] [JSN] |
R2-1916540 | [DRAFT] LS on F1AP over LTE leg signalling for IAB |
LS out LS To: RAN3 revision of R2-1915704 revised to R2-1916577 |
Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
revised | [WTS] [JSN] | |
R2-1916541 | LS on UE capabilities and RRC signalling on Tx switching period delay (R4-1916083; contact: Apple) |
LS in source LS: R4-1916083 LS To: RAN2 |
RAN4 | NR_RF_FR1 | Rel-16 |
R2-108 AI: 6.19 |
available | [WTS] [JSN] | |
R2-1916542 | LS on UE capability of intraBandENDC-Support (R4-1913130; Qualcomm) |
LS in source LS: R4-1913130 LS To: RAN2 |
RAN4 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.1 |
available | [WTS] [JSN] | |
R2-1916543 | [DRAFT] LS on inter-RAT HO from SA to EN-DC |
LS out LS To: RAN3, RAN4 revised to R2-1916600 |
China Telecom | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
revised | [WTS] [JSN] | |
R2-1916544 | [Draft] LS on Network Coordination for UL PDCP Duplication |
LS out LS To: RAN3 revision of R2-1915494 revised to R2-1916576 |
Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
revised | [WTS] [JSN] | |
R2-1916545 | NE-DC dynamic power sharing capability |
CR revision of R2-1916143 |
Qualcomm Incorporated | 38.306 15.7.0 CR#2161 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
agreed | [WTS] [JSN] |
R2-1916546 | Correction on initial BWP bandwidth capabilities |
CR revision of R2-1916035 |
Huawei, HiSilicon | 38.306 15.7.0 CR#2151 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
agreed | [WTS] [JSN] |
R2-1916547 | Need for Ethernet padding compression |
LS out LS To: SA1 revision of R2-1915810 |
RAN2 | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.3 |
approved | [WTS] [JSN] | |
R2-1916548 | Stage 2 CR for Inter-RAT HO between NR to EN-DC in Rel-16 |
draftCR revision of R2-1914512 revised to R2-1916586 |
China Telecommunications, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
revised | [WTS] [JSN] | |
R2-1916549 | Corrections on the PDCP duplication |
CR revision of R2-1916034 revised to R2-1916557 |
Huawei, HiSilicon | 38.331 15.7.0 CR#14161 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.2 |
revised | [WTS] [JSN] |
R2-1916550 | Clarification for PDCP duplication (de)activation by RRC | discussion | Huawei |
R2-108 AI: 5.4.1.3.2 |
postponed | [WTS] [JSN] | |||
R2-1916551 | Correction on PRACH procedure with SRS switching |
CR revision of R2-1916008 |
Huawei, HiSilicon | 38.321 15.7.0 CR#6801 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
agreed | [WTS] [JSN] |
R2-1916552 | Correction on CORESET location |
CR revision of R2-1915489 |
Huawei, HiSilicon | 38.331 15.7.0 CR#13791 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.1 |
agreed | [WTS] [JSN] |
R2-1916553 | Work plan for Industrial IoT WI finalization | discussion | Nokia (Rapporteur) | NR_IIOT |
R2-108 AI: 6.7.1 |
available | [WTS] [JSN] | ||
R2-1916554 | Text Proposal for TS 36.331 for support of F1AP signalling over LTE leg | draftCR | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
endorsed | [WTS] [JSN] | |
R2-1916555 | TP on Feeder Link Switch |
pCR revision of R2-1916386 |
CATT, Huawei, HiSilicon | 38.821 0.9.0 | FS_NR_NTN_solutions | Rel-16 |
R2-108 AI: 6.6.4.1 |
agreed | [WTS] [JSN] |
R2-1916556 | PSCell MIB configuration in MR-DC | discussion | MediaTek Inc. |
R2-108 AI: 5.4.1.6 |
noted | [WTS] [JSN] | |||
R2-1916557 | Corrections on the PDCP duplication |
CR revision of R2-1916549 |
Huawei, HiSilicon | 38.331 15.7.0 CR#14162 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.2 |
postponed | [WTS] [JSN] |
R2-1916558 | Report of offline discussion #202 | discussion | LG Electronics Inc | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
available | [WTS] [JSN] | |
R2-1916559 | [DRAFT] LS on Additional frequency information for SRS RSRP resource configuration |
LS out LS To: RAN1 |
LGE | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.1 |
noted | [WTS] [JSN] | |
R2-1916560 | PDCP configuration generation (email discussion of 107#25) |
CR revision of R2-1915588 revised to R2-1916602 |
Huawei, HiSilicon | 37.34 15.7.0 CR#1582 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1916561 | Check RAN1 impacts of UE autonomous transmission of de-prioritized CG PDU | discussion | Qualcomm Incorporated | NR_IIOT |
R2-108 AI: 6.7.3.1 |
noted | [WTS] [JSN] | ||
R2-1916562 | Introduction of additional enhancements for eMTC | draftCR | Huawei | LTE_eMTC5-Core | Rel-16 |
R2-108 AI: 7.1.1 |
endorsed | [WTS] [JSN] | |
R2-1916563 | LS on updates for TS 36.300 and TS 38.300 |
LS out LS To: RAN3 LS reply in R3-200180, R3-201297 |
RAN2 | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.1.1 |
approved | [WTS] [JSN] | |
R2-1916564 | Report of [108#19] When to resume DRBs in UP optimization for 5GC | discussion | Ericsson (Rapporteur) |
R2-108 AI: 7.1.12 |
noted | [WTS] [JSN] | |||
R2-1916565 | Introduction of Rel-16 NB-IoT enhancements |
draftCR revision of R2-1914593 revised to R2-2002090 |
Nokia | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
endorsed | [WTS] [JSN] | |
R2-1916566 | Introduction of additional enhancements for NB-IoT in TS 36.331 |
draftCR revision of R2-1915298 |
Huawei | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
endorsed | [WTS] [JSN] | |
R2-1916567 | Introduction of additional enhancements for NB-IoT in TS 36.300 |
draftCR revision of R2-1915299 |
Huawei | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
endorsed | [WTS] [JSN] | |
R2-1916568 | Running CR on 36.321 for NB-IoT |
draftCR revision of R2-1915404 |
Ericsson | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
endorsed | [WTS] [JSN] | |
R2-1916569 | Introduction to additional enhancements NB-IoT Rel-16 |
draftCR revision of R2-1915449 |
BlackBerry | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
endorsed | [WTS] [JSN] | |
R2-1916570 | Introduction of additional enhancements for NB-IoT |
CR revision of R2-1915608 revised to R2-2000304 |
Qualcomm Incorporated | 38.3 15.7.0 CR#1762 catB | NB_IOTenh3-Core | Rel-16 |
R2-108 AI: 7.2.1 |
endorsed | [WTS] [JSN] |
R2-1916571 | Correction on ambiguity of UE FDD/TDD FR1/FR2 capabilities |
CR revision of R2-1916495 |
ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | 38.306 15.7.0 CR#220 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1916572 | LS on Uplink skipping |
LS out LS To: RAN1 LS reply in R1-2001376 revision of R2-1916503 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.3.1 |
approved | [WTS] [JSN] | |
R2-1916573 | Draft CR to 36.331 on Integrated Access and Backhaul for (NG)EN-DC |
draftCR revision of R2-1915468 |
Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.2 |
reserved | [WTS] [JSN] | |
R2-1916574 | Running CR to TS 38.331 on IAB for NR |
draftCR revision of R2-1915469 |
Ericsson | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.5.2 |
available | [WTS] [JSN] | |
R2-1916575 | [DRAFT] LS on introduction of additional CG periodicities |
LS out LS To: RAN1 |
Nokia | NR_IIOT | Rel-16 |
R2-108 AI: 6.7.2.2.1 |
withdrawn | [WTS] [JSN] | |
R2-1916576 | LS on Network Coordination for UL PDCP Duplication |
LS out LS To: RAN3 LS reply in R3-201667, R3-203283, R3-204168 revision of R2-1916544 |
RAN2 | NR_IIOT-Core | Rel-16 |
R2-108 AI: 6.7.4.1 |
approved | [WTS] [JSN] | |
R2-1916577 | LS on F1AP over LTE leg signalling for IAB |
LS out LS To: RAN3 revision of R2-1916540 |
RAN2 | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.2 |
approved | [WTS] [JSN] | |
R2-1916578 | LS on channel raster for NR V2X UE (R4-1916146; contact: CATT) |
LS in source LS: R4-1916146 LS To: RAN2 |
RAN4 | 5G_V2X_NRSL | Rel-16 |
R2-108 AI: 6.4.1 |
available | [WTS] [JSN] | |
R2-1916579 | LS on EN-DC related MDT configuration details |
LS out LS To: RAN3, SA5 revision of R2-1916417 |
RAN2 | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
approved | [WTS] [JSN] | |
R2-1916580 | LS on RACH report and RLF report |
LS out LS To: RAN3 revision of R2-1916420 |
RAN2 | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.4 |
approved | [WTS] [JSN] | |
R2-1916581 | Offline discussion summary of UL dormancy behaviour | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
available | [WTS] [JSN] | |
R2-1916582 | Offline discussion [#45] cross-carrier scheduling CR | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.6 |
noted | [WTS] [JSN] | |
R2-1916583 | CR to 38.331 on support of cross-carrier scheduling with different numerology | draftCR | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.6 |
endorsed | [WTS] [JSN] | |
R2-1916584 | [Draft] LS on FR2 gap timing impacts of async CA |
LS out LS To: RAN4 |
Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.7 |
noted | [WTS] [JSN] | |
R2-1916585 | LS reply on CSI/SRS reporting (R1-1913480; contact: vivo) |
LS in source LS: R1-1913480 LS To: RAN2 |
RAN1 | NR_UE_pow_sav-Core | Rel-16 |
R2-108 AI: 6.11.1 |
available | [WTS] [JSN] | |
R2-1916586 | Stage 2 CR for Inter-RAT HO between NR to EN-DC in Rel-16 |
draftCR revision of R2-1916548 revised to R2-2002077 |
China Telecommunications, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
agreed | [WTS] [JSN] | |
R2-1916587 | [Draft] LS on RAN2 progress on SCell uplink behaviour of the UE in dormancy |
LS out LS To: RAN1 revised to R2-1916601 |
Intel | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
revised | [WTS] [JSN] | |
R2-1916588 | LS on MDT Measurements |
LS out LS To: RAN4 LS reply in R4-2001952, R4-2002261 revision of R2-1916418 |
RAN2 | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
approved | [WTS] [JSN] | |
R2-1916589 | Security requirements for split PDU session (38.331) |
CR revision of R2-1916486 |
Ericsson, Qualcomm | 38.331 15.7.0 CR#14032 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.8 |
agreed | [WTS] [JSN] |
R2-1916590 | [DRAFT] Reply LS on Handling of Fallbacks for combined contiguous and non-contiguous CA or DC configurations in FR2 |
LS out LS is reply to R2-1912047 LS To: RAN4 |
Ericsson | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
available | [WTS] [JSN] | |
R2-1916591 | Running CR on 38.331 for on-demand SI procedure in RRC_CONNECTED |
draftCR revision of R2-1916522 |
Ericsson | NR_unlic-Core, 5G_V2X_NRSL-Core, NR_IIOT-Core, LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.21 |
endorsed | [WTS] [JSN] | |
R2-1916592 | LS on default codebook parameters |
LS out LS To: RAN1 LS reply in R1-2000246, R1-2000300, R1-2000551, R1-2000601, R1-2001307 revision of R2-1916496 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.4 |
approved | [WTS] [JSN] | |
R2-1916593 | Clarification on ne-DC capability |
CR revision of R2-1915587 |
Huawei, HiSilicon | 38.306 15.7.0 CR#2001 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
agreed | [WTS] [JSN] |
R2-1916594 | Clarification on the en-DC and ng-EN-DC |
CR revision of R2-1915586 |
Huawei, HiSilicon | 36.306 15.6.0 CR#17201 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.2 |
agreed | [WTS] [JSN] |
R2-1916595 | LS on measurement reporting criteria for EN-DC |
LS out LS To: RAN4 LS reply in R4-2001924, R4-2004653 revision of R2-1916524 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.5.3 |
approved | [WTS] [JSN] | |
R2-1916596 | Overheating issue in (NG)EN-DC | discussion | Huawei, HiSilicon |
R2-108 AI: 6.20.1 |
postponed | [WTS] [JSN] | |||
R2-1916597 | LS on secondary DRX group |
LS out LS To: RAN1, RAN4 LS reply in R4-2000782, R1-2000510, R1-2001083, R4-2003400, R1-2001582, R1-2002492, R1-2002662, R1-2002961, R4-2005296 revision of R2-1916509 |
RAN2 | TEI16 | Rel-16 |
R2-108 AI: 6.20.2 |
approved | [WTS] [JSN] | |
R2-1916598 | LS on trace related configurations for NR MDT |
LS out LS To: SA5 revision of R2-1916416 |
RAN2 | NR_SON_MDT-Core | Rel-16 |
R2-108 AI: 6.12.2 |
approved | [WTS] [JSN] | |
R2-1916599 | LS on handover without SN configuration query |
LS out LS To: RAN3 revision of R2-1915571 revised to R2-1916622 |
Huawei | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
revised | [WTS] [JSN] | |
R2-1916600 | LS on inter-RAT HO from SA to EN-DC |
LS out LS To: RAN3, RAN4 revision of R2-1916543 |
RAN2 | TEI16 | Rel-16 |
R2-108 AI: 6.20.1 |
approved | [WTS] [JSN] | |
R2-1916601 | LS on RAN2 progress on Scell uplink behaviour of the UE in dormancy |
LS out LS To: RAN1 revision of R2-1916587 |
RAN2 | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.4.2 |
approved | [WTS] [JSN] | |
R2-1916602 | PDCP configuration generation (email discussion of 107#25) |
CR revision of R2-1916560 |
Huawei, HiSilicon | 37.34 15.7.0 CR#1583 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1916603 | IP version on X2-U | CR | R3 (Huawei) | 37.34 15.7.0 CR#170 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916604 | Correction to MR-DC with 5GC with RRC_INACTIVE | CR | R3 (Google) | 37.34 15.7.0 CR#171 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916605 | Independent migration to IPv6 on NG-U | CR | R3 (Samsung) | 38.3 15.7.0 CR#182 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916606 | Correction of SN Status Transfer during HO with DC | CR | R3 (Nokia, Nokia Shanghai Bell) | 37.34 15.7.0 CR#172 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916607 | Correction of QoS flow re-mapping before handover | CR | R3 (Ericsson) | 38.3 15.7.0 CR#183 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916608 | CR TS 38.300 Remote Interference Management | CR | R3 (Ericsson, CMCC) | 38.3 15.7.0 CR#184 catB | NR_CLI_RIM | Rel-16 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916609 | Introduction of Additional RRM Policy Index (ARPI) | CR | R3 (Ericsson, Vodafone, Deutsche Telekom, Verizon Wireless, TIM, AT&T, Orange) | 36.3 15.7.0 CR#1256 catB | TEI16 | Rel-16 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916610 | Stage2 Introduction of ARPI&SPID for EN-DC |
CR revised to R2-1916631 |
R3 (ZTE) | 37.34 15.7.0 CR#173 catB | TEI16 | Rel-16 |
R2-108 AI: 2.4 |
revised | [WTS] [JSN] |
R2-1916611 | DRB ID co-ordination between MN and SN |
CR revised to R2-1916624 |
R3 (Ericsson) | 37.34 15.7.0 CR#174 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
revised | [WTS] [JSN] |
R2-1916612 | Introduction of direct data forwarding for inter-system HO between EPS and 5GS | CR | R3 (Ericsson, NTT DoCoMo, Samsung, Nokia, Huawei, ZTE, CATT) | 38.3 15.7.0 CR#185 catB | Direct_data_fw_NR-Core | Rel-16 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916613 | Correcting misbehaviors and clean-ups on 37.340 related to PDU session spilt | CR | R3 (Intel Corporation, Nokia, Nokia Shanghai Bell) | 37.34 15.7.0 CR#175 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916614 | Resuming SCG in RRC Resume |
CR revised to R2-1916625 |
R3 (Ericsson) | 37.34 15.7.0 CR#176 catB | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 2.4 |
revised | [WTS] [JSN] |
R2-1916615 | Stage2 Clarifications for RRC_Inactive with MR-DC@5GC | CR | R3 (ZTE, Qualcomm Incorporated, China Telecom, China Unicom) | 37.34 15.7.0 CR#177 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916616 | Correction of NG connection in MR DC | CR | R3 (Nokia, Nokia Shanghai Bell, Orange) | 37.34 15.7.0 CR#178 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916617 | Correcting misbehaviors and clean-ups on 37.340 related to data forwarding and SN status transfer | CR | R3 (Intel Corporation, CATT, Google) | 37.34 15.7.0 CR#179 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916618 | TS36.300 Removal of Requirement for Exchanging Complete Cell List over X2 | CR | R3 (ZTE, Ericsson, China Unicom) | 36.3 15.7.0 CR#1257 catF | TEI16 | Rel-16 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916619 | Clarification on the offered non-GBR resources |
CR revised to R2-1916635 |
R3 (Huawei, Ericsson, China Unicom, CMCC) | 37.34 15.7.0 CR#180 catF | NR_newRAT-Core | Rel-16 |
R2-108 AI: 2.4 |
revised | [WTS] [JSN] |
R2-1916620 | LS on LS on system level design assumptions for satellite in 5GS |
LS out LS is reply to S2-1910787 LS To: SA2, RAN3 revision of R2-1916395 |
RAN2 | FS_5GSAT_ARCH | Rel-16 |
R2-108 AI: 6.6.1 |
approved | [WTS] [JSN] | |
R2-1916621 | Response LS on SL RLM/RLF |
LS out LS is reply to R1-1913464 LS To: RAN1, SA2 revision of R2-1916464 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
approved | [WTS] [JSN] | |
R2-1916622 | LS on handover without SN configuration query |
LS out LS To: RAN3 revision of R2-1916599 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.9 |
approved | [WTS] [JSN] | |
R2-1916623 | Reply LS on extended NAS timers for CE in 5GS |
LS out source LS: R2-1916360 LS To: CT1 revision of R2-1916360 |
Ericsson | LTE_eMTC5-Core, NB_IOTenh3-Core, 5G_CIoT | Rel-16 |
R2-108 AI: 7.1.1 |
approved | [WTS] [JSN] | |
R2-1916624 | DRB ID co-ordination between MN and SN |
CR revision of R2-1916611 |
Ericsson, ZTE Corporation (Rapporteur) | 37.34 15.7.0 CR#1741 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916625 | Resuming SCG in RRC Resume |
CR revision of R2-1916614 |
Ericsson, ZTE Corporation (Rapporteur) | 37.34 15.7.0 CR#1761 catB | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916626 | Clarification on UE Inactive AS context |
CR revision of R2-1916313 |
Google Inc. | 36.331 15.7.0 CR#41772 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-108 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R2-1916627 | Miscellaneous non-controversial corrections Set IV |
CR revision of R2-1916350 |
Ericsson | 38.331 15.7.0 CR#13233 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
agreed | [WTS] [JSN] |
R2-1916628 | Correction on the EUTRAN terminology |
CR revision of R2-1914983 |
Huawei, HiSilicon | 38.305 15.4.0 CR#142 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.3 |
agreed | [WTS] [JSN] |
R2-1916629 | Correction to key derivation for the UE configured with sk-counter |
CR revision of R2-1916483 |
Huawei, HiSilicon | 38.331 15.7.0 CR#13812 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.4 |
agreed | [WTS] [JSN] |
R2-1916630 | Correction to Pcompensation for FR2 |
CR revision of R2-1916296 |
Huawei, HiSilicon | 38.304 15.5.0 CR#1431 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R2-1916631 | Stage2 Introduction of ARPI&SPID for EN-DC |
CR revision of R2-1916610 |
R3 (ZTE) | 37.34 15.7.0 CR#1731 catB | TEI16 | Rel-16 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916632 | Correction of UE assistance information |
CR revision of R2-1916489 |
Samsung Telecommunications | 38.331 15.7.0 CR#14052 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.4.1.3.11 |
agreed | [WTS] [JSN] |
R2-1916633 | Clarification on security key change and bearer termination point change |
CR revision of R2-1914810 |
ZTE Corporation, Ericsson, Intel | 37.34 15.7.0 CR#1632 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1916634 | Clarification of NR-DC synchronization |
CR revision of R2-1914811 |
ZTE Corporation | 37.34 15.7.0 CR#1602 catF | NR_newRAT-Core | Rel-15 |
R2-108 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1916635 | Clarification on the offered non-GBR resources |
CR revision of R2-1916619 |
R3 (Huawei, Ericsson, China Unicom, CMCC) | 37.34 15.7.0 CR#1801 catF | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 2.4 |
agreed | [WTS] [JSN] |
R2-1916636 | Draft TS 38.340 (BAP) |
draft TS revision of R2-1916164 |
Huawei | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.1 |
withdrawn | [WTS] [JSN] | |
R2-1916637 | Support for Non-Public Networks |
draftCR revision of R2-1916337 |
Nokia (Rapporteur) | NG_RAN_PRN-Core | Rel-16 |
R2-108 AI: 6.18.1 |
endorsed | [WTS] [JSN] | |
R2-1916638 | Running CR Introduction of 5G V2X with NR Sidelink |
draftCR revision of R2-1916030 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-108 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1916639 | Introduction of Cross Link Interference (CLI) handling and Remote Interference Management (RIM) |
CR revision of R2-1916338 |
LG Electronics Inc. | 38.331 15.7.0 CR#14232 catB | NR_CLI_RIM-Core | Rel-16 |
R2-108 AI: 6.15.1 |
endorsed | [WTS] [JSN] |
R2-1916640 | Introduction of T312 for PCell and PSCell in NR (Draft) |
draftCR revision of R2-1916198 |
Samsung, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated | NR_Mob_enh-Core | Rel-16 |
R2-108 AI: 6.9.3.4 |
endorsed | [WTS] [JSN] | |
R2-1916641 | CR to 38.300 on Integrated Access and Backhaul for NR |
CR revision of R2-1913998 |
Qualcomm | 38.3 15.7.0 CR#1536 catB | NR_IAB-Core | Rel-16 |
R2-108 AI: 6.1.1 |
endorsed | [WTS] [JSN] |
R2-1916642 | Running CR to 37.340 for CA_DC enhancements |
draftCR revision of R2-1912268 |
vivo, Ericsson | LTE_NR_DC_CA_enh-Core | Rel-15 |
R2-108 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1916643 | Text proposal of power control for NR-DC | draftCR | vivo | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-108 AI: 6.10.2 |
endorsed | [WTS] [JSN] | |
R2-1916644 | Report of [108#45][LTE NR Mob] UE feature list for LTE and NR mobility (Intel) | report | Intel Corporation |
R2-108 AI: 6.9.1 |
reserved | [WTS] [JSN] | |||
R2-1916645 | LS on clarification of CLI resource configuration |
LS out LS To: RAN1 LS reply in R1-2000508, R1-2000600, R1-2000948, R1-2001108, R1-2001319 |
RAN2 | NR_CLI_RIM | Rel-16 |
R2-108 AI: 6.15.1 |
approved | [WTS] [JSN] |
2346 documents (1.1158108711243 seconds)