Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-1912000 | Agenda for RAN2#107bis | agenda | Chairman |
R2-107 AI: 2.1 |
approved | [WTS] [JSN] | |||
R2-1912001 | RAN2#107 Meeting Report | report | MCC |
R2-107 AI: 2.2 |
approved | [WTS] [JSN] | |||
R2-1912002 | Reply LS on NAS Aspects of Mobile-terminated Early Data Transmission (C1-195111; contact: Qualcomm) |
LS in LS is reply to S2-1908629 source LS: C1-195111 LS To: SA2, SA3 |
CT1 | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1912003 | LS on sending CAG ID during resume procedure (C1-195157; contact: Samsung) |
LS in source LS: C1-195157 LS To: SA2 |
CT1 | Vertical_LAN | Rel-16 |
R2-107 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1912004 | LS on short MAC-I and ngKSI for 5G-CIoT (C1-195199; contact: Vodafone) |
LS in source LS: C1-195199 LS To: SA3 |
CT1 | 5G_CIoT | Rel-16 |
R2-107 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R2-1912005 | LS on encoding of UE radio capabilities (C3-193147; contact: Qualcomm) |
LS in source LS: C3-193147 LS To: RAN2 |
CT3 | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.1 |
noted | [WTS] [JSN] | |
R2-1912006 | Liaison response on Ethernet header compression (liaison-response-3GPP-RAN2-Ethernet-header-compression-0719-v01; contact: Ericsson, Nokia) |
LS in LS is reply to R2-1908152 source LS: liaison-response-3GPP-RAN2-Ethernet-header-compression-0719-v0 LS To: RAN2 |
GSMA | NR_IIOT |
R2-107 AI: 6.7.2.3 |
noted | [WTS] [JSN] | ||
R2-1912007 | LS on O-RAN Alliance & 3GPP Coordination on O-RAN Alliance Outputs (ORAN_3GPP_Liaison_Statement_final; contact: AT&T, CMCC) |
LS in source LS: ORAN_3GPP_Liaison_Statement_final LS To: SA, CT, RAN, SA1, SA2, SA3, SA5, SA6, RAN1, RAN2, RAN3 |
O-RAN Alliance | Rel-16 |
R2-107 AI: 3 |
noted | [WTS] [JSN] | ||
R2-1912008 | Reply LS on PDCCH monitoring for NR-DC (R1-1909550; contact: Samsung) |
LS in LS is reply to R2-1908487 source LS: R1-1909550 LS To: RAN2 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912009 | LS Reply on overall procedure for 2-step RACH (R1-1909554; contact: ZTE) |
LS in LS is reply to R2-1908481 source LS: R1-1909554 LS To: RAN1 |
RAN1 | NR_2step_RACH | Rel-16 |
R2-107 AI: 6.13.1 |
noted | [WTS] [JSN] | |
R2-1912010 | Reply LS on quality report in Msg3 for LTE-M (R1-1909793; contact: Ericsson) |
LS in source LS: R1-1909793 LS To: RAN2 |
RAN1 | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1912011 | LS on DL/UL Reference Signals and Measurements for NR Positioning (R1-1909796; contact: Intel) |
LS in source LS: R1-1909796 LS To: RAN2 |
RAN1 | NR_pos | Rel-16 |
R2-107 AI: 6.8.1 |
noted | [WTS] [JSN] | |
R2-1912012 | Reply LS on SFTD measurement (R1-1909819; contact: Huawei) |
LS in LS is reply to R4-1907319 source LS: R1-1909819 LS To: RAN2, RAN4 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912013 | Reply LS on MAC CE design for SCell BFR (R1-1909833; contact: Apple) |
LS in LS is reply to R2-1911795 source LS: R1-1909833 LS To: RAN2 LS reply in R2-1913880 |
RAN1 | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.1 |
noted | [WTS] [JSN] | |
R2-1912014 | Reply LS on Tx DC location (R1-1909849; contact: Huawei) |
LS in LS is reply to R4-1905486 source LS: R1-1909849 LS To: RAN4 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912015 | Reply LS on transmission of short message with multiple beams (R1-1909852; contact: Qualcomm) |
LS in LS is reply to R2-1908140 source LS: R1-1909852 LS To: RAN2 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912016 | Reply LS on RAN1/4 feature lists R1-1909856; contact: NTT DOCOMO) |
LS in LS is reply to R2-1908476 source LS: R1-1909856 LS To: RAN2 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912017 | LS on mapping between LTE V2X PPPP and NR V2X priority (R1-1909876; contact: Qualcomm) |
LS in source LS: R1-1909876 LS To: SA2 |
RAN1 | 5G_V2X_NRSL | Rel-16 |
R2-107 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1912018 | Reply LS on Sidelink HARQ Feedback for Groupcast (R1-1909879; contact: LGE) |
LS in LS is reply to R2-1908303 source LS: R1-1909879 LS To: RAN2, SA2 |
RAN1 | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1912019 | LS on DL HARQ timing for FDD Scell for LTE TDD-FDD CA with TDD Pcell, applied to FDD Pcell, for Dual Uplink EN-DC (R1-1909880; contact: Vodafone) |
LS in source LS: R1-1909880 LS To: RAN2 |
RAN1 | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
noted | [WTS] [JSN] | |
R2-1912020 | LS on SFN sync (R1-1909882; contact: Nokia) |
LS in source LS: R1-1909882 LS To: RAN, RAN2 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912021 | Reply LS to RAN 2 on CSI reporting in C-DRX (R1-1909889; contact: Qualcomm) |
LS in LS is reply to R2-1908159 source LS: R1-1909889 LS To: RAN2 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912022 | Reply LS on NR fast SCell activation (R1-1909893; contact: Qualcomm) |
LS in LS is reply to R2-1908483 source LS: R1-1909893 LS To: RAN2, RAN4 |
RAN1 | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
noted | [WTS] [JSN] | |
R2-1912023 | Reply LS on maximum value of MDBV (R1-1909894; contact: Qualcomm) |
LS in LS is reply to S2-1907955 source LS: R1-1909894 LS To: SA2, RAN2, RAN3, CT3, CT4 |
RAN1 | 5GS_Ph1 | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912024 | LS on NR Rel-16 TEI (R1-1909895; contact: NTT DOCOMO) |
LS in source LS: R1-1909895 LS To: RAN |
RAN1 | TEI16 | Rel-16 |
R2-107 AI: 6.20.3 |
noted | [WTS] [JSN] | |
R2-1912025 | Response to LS on Combination 2 of Uu QoS characteristics values for V2X services (R1-1909898; contact: Huawei) |
LS in LS is reply to S2-1813386 source LS: R1-1909898 LS To: SA2 |
RAN1 | NR_L1enh_URLLC | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912026 | Reply LS on supported BW for initial BWP (R1-1909900; contact: Nokia) |
LS in LS is reply to R2-1908301 source LS: R1-1909900 LS To: RAN2, RAN4 |
RAN1 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912027 | Reply LS on propagation delay compensation for reference time information delivery (R1-1909906; contact: Nokia) |
LS in LS is reply to R2-1908160 source LS: R1-1909906 LS To: RAN2, RAN4, RAN5 |
RAN1 | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.1 |
noted | [WTS] [JSN] | |
R2-1912028 | Reply LS on Combinations of Uu QoS characteristics values for V2X services (R3-193258; contact: Huawei) |
LS in LS is reply to R1-1905904 source LS: R3-193258 LS To: RAN1 |
RAN3 | NR_L1enh_URLLC | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912029 | Reply on radio resource management policy (R3-194550; contact: Huawei) |
LS in LS is reply to S5-194458 source LS: R3-194550 LS To: SA5 |
RAN3 | eNRM | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912030 | Reply LS on LS on maximum value of MDBV (R3-194553; contact: Qualcomm) |
LS in LS is reply to S2-1907955 source LS: R3-194553 LS To: SA2, RAN1, RAN2, CT3, CT4 |
RAN3 | 5GS_Ph1 | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912031 | Reply LS on Data activity reporting (R3-194572; contact: Ericsson) |
LS in LS is reply to S2-1904761 source LS: R3-194572 LS To: SA5 |
RAN3 | 5G_SLICE_ePA | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912032 | Reply LS on LTE-M identification in 5GC (R3-194748; contact: Qualcomm) |
LS in LS is reply to S2-1906831 source LS: R3-194748 LS To: SA2, RAN, RAN2 |
RAN3 | 5G_CIoT | Rel-16 |
R2-107 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1912033 | LS on full configuration during SN Modification procedure (R3-194758; contact: Huawei) |
LS in source LS: R3-194758 LS To: RAN2 LS reply in R2-1913608, R2-1914164, R2-1914218, R2-1914228 |
RAN3 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912034 | LS on enhanced Make-Before-Break data forwarding (R3-194768; contact: Ericsson) |
LS in source LS: R3-194768 LS To: RAN2 |
RAN3 | LTE_feMob, NR_Mob_enh | Rel-16 |
R2-107 AI: 7.3.1 |
noted | [WTS] [JSN] | |
R2-1912035 | Reply LS on RAN sharing and Emergency services with Non-Public Networks (R3-194785; contact: Qualcomm) |
LS in LS is reply to S2-1906814 source LS: R3-194785 LS To: SA2, RAN2 |
RAN3 | Vertical_LAN | Rel-16 |
R2-107 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1912036 | LS on clarifications on Private Networks (R3-194786; contact: Nokia) |
LS in source LS: R3-194786 LS To: SA2 |
RAN3 | NG_RAN_PRN | Rel-16 |
R2-107 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1912037 | LS on the IAB-indication to core network (R3-194787; contact: Qualcomm) |
LS in source LS: R3-194787 LS To: SA2, RAN2 |
RAN3 | NR_IAB | Rel-16 |
R2-107 AI: 6.1.1 |
noted | [WTS] [JSN] | |
R2-1912038 | Reply LS on Enhancements to QoS Handling for V2X Communication Over Uu Reference Point (R3-194795; contact: Vodafone) |
LS in LS is reply to S2-1908627 source LS: R3-194795 LS To: SA2, RAN2 |
RAN3 | eV2XARC | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912039 | Reply LS on measurement gap for SRS-RSRP or CLI-RSSI measurements (R4-1908777; contact: LGE) |
LS in LS is reply to R2-1908464 source LS: R4-1908777 LS To: RAN2 |
RAN4 | NR_CLI_RIM-Core | Rel-16 |
R2-107 AI: 6.15 |
noted | [WTS] [JSN] | |
R2-1912040 | Reply LS on RAN1/4 feature lists (R4-1909845; contact: Intel) |
LS in LS is reply to R2-1908476 source LS: R4-1909845 LS To: RAN2 |
RAN4 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912041 | Reply LS on simultaneous RX/TX for NR (R4-1909992; contact: Ericsson) |
LS in LS is reply to R2-1902745 source LS: R4-1909992 LS To: RAN1, RAN2 |
RAN4 | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.1 |
noted | [WTS] [JSN] | |
R2-1912042 | Reply LS on maximum allowed SCell activation delay for Rel16 CA (R4-1909995; contact: Nokia) |
LS in LS is reply to R1-1905901 source LS: R4-1909995 LS To: RAN1 |
RAN4 | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
noted | [WTS] [JSN] | |
R2-1912043 | LS Reply on measurements for SRVCC from 5G to 3G (R4-1910026; contact: Huawei) |
LS in LS is reply to R2-1908472 source LS: R4-1910026 LS To: RAN2 |
RAN4 | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-107 AI: 6.14.1 |
noted | [WTS] [JSN] | |
R2-1912044 | Reply to LS on DL channel quality report for configured carrier in RRC connected mode (R4-1910110; contact: Qualcomm) |
LS in LS is reply to R2-1908262 source LS: R4-1910110 LS To: RAN2 |
RAN4 | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R2-1912045 | LS on signalling measurement thresholds for validating the TA for PUR (R4-1910176; contact: Ericsson) |
LS in source LS: R4-1910176 LS To: RAN2 |
RAN4 | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1912046 | Reply LS on SFTD measurement (R4-1910179; contact: ZTE) |
LS in LS is reply to R2-1905453 source LS: R4-1910179 LS To: RAN2 |
RAN4 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912047 | LS on Handling of Fallbacks for combined contiguous and non-contiguous CA or DC configurations in FR2 (R4-1910239; contact: Apple) |
LS in source LS: R4-1910239 LS To: RAN2 LS reply in R2-1916590, R2-2004267 |
RAN4 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912048 | LS on FR2 Pmax (R4-1910262; contact: Huawei) |
LS in source LS: R4-1910262 LS To: RAN2 |
RAN4 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912049 | LS reply on supported BW for initial BWP (R4-1910522; contact: Nokia) |
LS in LS is reply to R2-1908301 source LS: R4-1910522 LS To: RAN1, RAN2 |
RAN4 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912050 | LS on sidelink BWP reconfiguration on ITS band (R4-1910542; contact: MediaTek) |
LS in source LS: R4-1910542 LS To: RAN1 |
RAN4 | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1912051 | Reply LS on reporting criteria limitation in MR-DC (R4-1910570; contact: Huawei) |
LS in LS is reply to R2-1902696 source LS: R4-1910570 LS To: RAN2 |
RAN4 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1912052 | LS on RSSI definition (R4-1910573; contact: MediaTek) |
LS in source LS: R4-1910573 LS To: RAN1 |
RAN4 | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.1 |
noted | [WTS] [JSN] | |
R2-1912053 | Reply LS on NR fast SCell activation (R4-1910574; contact: Huawei) |
LS in LS is reply to R2-1908483 source LS: R4-1910574 LS To: RAN1, RAN2 |
RAN4 | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
noted | [WTS] [JSN] | |
R2-1912054 | LS on evaluation of S criteria on non-anchor carrier (R4-1910575; contact: Huawei) |
LS in source LS: R4-1910575 LS To: RAN2 |
RAN4 | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R2-1912055 | LS to RAN2 on mandatory 90 MHz UE channel bandwidth for n41 and n78 in REL-16 (R4-1910605; contact: Vodafone) |
LS in source LS: R4-1910605 LS To: RAN2 |
RAN4 | NR_newRAT-Core | Rel-16 |
R2-107 AI: 6.20.3 |
noted | [WTS] [JSN] | |
R2-1912056 | LS on Rel-16 NB-IoT enhancements (RP-192338; contact: Futurewei) |
LS in source LS: RP-192338 LS To: SA2, CT1 |
RAN | NB_IOTenh3 | Rel-16 |
R2-107 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R2-1912057 | Reply on Combinations of Uu QoS characteristics values for V2X services (S2-1906340; contact: Huawei) |
LS in LS is reply to R1-1905904 source LS: S2-1906340 LS To: RAN1, RAN3 |
SA2 | eV2XARC, NR_L1enh_URLLC | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912058 | Reply LS on Reply LS on Mobile-terminated Early Data Transmission (S3-193059; contact: Nokia) |
LS in LS is reply to S2-1908629 source LS: S3-193059 LS To: SA2, RAN2, RAN3, CT1 |
SA3 | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1912059 | LS on Sending CAG ID in NAS layer (S3-193142; contact: Qualcomm) |
LS in source LS: S3-193142 LS To: SA2, RAN2, RAN3 |
SA3 | FS_Vertical_LAN_SEC | Rel-16 |
R2-107 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1912060 | LS to RAN2 and RAN3 on False Base Station Detection (S3-193175; contact: Huawei) |
LS in source LS: S3-193175 LS To: RAN2, RAN3 |
SA3 | FS_5GFBS | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912061 | LS on QoE Measurement Collection (S5-195659; contact: Ericsson) |
LS in source LS: S5-195659 LS To: CT1, RAN2, RAN3, SA4 LS reply in R2-1912640, R2-1914643, R2-1916315, R2-1916326, R2-1916328 |
SA5 | QOED | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912062 | Reply LS on L1 and L2 measurements (S5-195941; contact: Huawei) |
LS in LS is reply to R3-192122 source LS: S5-195941 LS To: RAN2, RAN3 |
SA5 | 5G_SLICE_ePA | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912063 | LS on aspects of Mission Critical Services over 5MBS (S6-192003; contact: AT&T) |
LS in source LS: S6-192003 LS To: SA, RAN, SA2, RAN2, RAN3 |
SA6 | FS_MC5MBS | Rel-17 |
R2-107 AI: 3 |
postponed | [WTS] [JSN] | |
R2-1912064 | Reply LS to “O-RAN Alliance & 3GPP Coordination on O-RAN Alliance Outputs” (SP-190947; contact: Intel) |
LS in LS is reply to SP-190876 source LS: SP-190947 LS To: O-RAN Alliance |
SA |
R2-107 AI: 3 |
noted | [WTS] [JSN] | |||
R2-1912065 | Discussion on SL capability signaling for Uu-RRC | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912066 | Left issues on SIB and cell reselection for NR-V2X | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912067 | Discussion on SL-related Uu-RRC messages | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912068 | Discussion on RLC mode configuration collision | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912069 | Left issues on RLC, PDCP and SDAP for NR-V2X | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912070 | Left issues on MAC for NR-V2X |
discussion revised to R2-1913941 |
OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.2 |
revised | [WTS] [JSN] | ||
R2-1912071 | Left issues on UL-SL prioritization for NR-V2X | discussion | OPPO, Apple | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.2 |
noted | [WTS] [JSN] | ||
R2-1912072 | [DRAFT] LS on HARQ option for group-cast |
LS out LS To: SA2 |
OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912073 | Left issues on PC5-RRC based AS layer configuration procedure | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | ||
R2-1912074 | Left issues on PC5-S impact on AS-layer | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | ||
R2-1912075 | Left issues on PC5-RRC based capability transfer procedure | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.5 |
noted | [WTS] [JSN] | ||
R2-1912076 | Left issues on SLRB configuration for NR-V2X | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | ||
R2-1912077 | Discussion on congestion control and admission control | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.6 |
noted | [WTS] [JSN] | ||
R2-1912078 | Miscellaneous issues on PC5-RRC | discussion | OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | ||
R2-1912079 | Left issue on idle mode mobility for NTN | discussion | OPPO | FS_NR_NTN_solutions |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912080 | Discussion on DL-TDOA positioning | discussion | ZTE Corporation | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1912081 | Discussion on UL-TDOA positioning in NR | discussion | ZTE Corporation | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1912082 | Discussion on multi-cell E-CID in NR | discussion | ZTE Corporation | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1912083 | Discussion on multi-cell E-CID in NR | discussion | ZTE Corporation | Rel-16 |
R2-107 AI: 6.8.2.1 |
withdrawn | [WTS] [JSN] | ||
R2-1912084 | Remaining issues on supporting only 2-step RACH configuration on a UL BWP | discussion | OPPO |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |||
R2-1912085 | msgB MAC PDU format in 2-step RACH | discussion | OPPO |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |||
R2-1912086 | Remaining stage-2 open issues | discussion | OPPO |
R2-107 AI: 6.13.2 |
noted | [WTS] [JSN] | |||
R2-1912087 | Stage3 issues on contention resolution for 2-step RACH | discussion | OPPO |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |||
R2-1912088 | Contention free 2-step RACH | discussion | OPPO |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |||
R2-1912089 | Remaining issues on UE behaviours when PDCCH-WUS is configured | discussion | OPPO |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |||
R2-1912090 | Remaining issues on configuration of PDCCH-WUS | discussion | OPPO |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |||
R2-1912091 | Impacts of power saivng signalling on CSI reporting | discussion | OPPO |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |||
R2-1912092 | MIMO layer adaptation for power saving | discussion | OPPO |
R2-107 AI: 6.11.4 |
not treated | [WTS] [JSN] | |||
R2-1912093 | UE assistance information for power saving | discussion | OPPO |
R2-107 AI: 6.11.5 |
not treated | [WTS] [JSN] | |||
R2-1912094 | RRM relaxation for power saving | discussion | OPPO |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |||
R2-1912095 | Remaining issues on detecting uplink LBT failure for NR-U | discussion | OPPO |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |||
R2-1912096 | Uplink LBT failure revoery for NR-U | discussion | OPPO |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |||
R2-1912097 | Issues on contention resolution timer in NR-U | discussion | OPPO |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912098 | Remaining issues on extending RA response window in NR-U | discussion | OPPO |
R2-107 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |||
R2-1912099 | [Draft] LS on supporting LBT type in RAR |
LS out LS To: RAN1 |
OPPO |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912100 | 2-step RACH for NR-U | discussion | OPPO |
R2-107 AI: 6.2.2.3 |
not treated | [WTS] [JSN] | |||
R2-1912101 | Remaining DRX issues for non-numerical K1 and HARQ feedback | discussion | OPPO |
R2-107 AI: 6.2.2.4 |
not treated | [WTS] [JSN] | |||
R2-1912102 | DRX procedure enhancements due to LBT impacts | discussion | OPPO |
R2-107 AI: 6.2.2.4 |
not treated | [WTS] [JSN] | |||
R2-1912103 | Remaining issues on NR-U configured grant | discussion | OPPO |
R2-107 AI: 6.2.2.5 |
not treated | [WTS] [JSN] | |||
R2-1912104 | Discussion RAN1 LS on supporting multiple frequency domain monitoring locations for a searchspace | discussion | OPPO |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | |||
R2-1912105 | RLM enhancements | discussion | OPPO |
R2-107 AI: 6.2.3.4 |
not treated | [WTS] [JSN] | |||
R2-1912106 | System information enhancements for NR-U | discussion | OPPO |
R2-107 AI: 6.2.3.5 |
not treated | [WTS] [JSN] | |||
R2-1912107 | RAN2 work plan for UE Power Saving WI | discussion | CATT (rapporteur) | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.1 |
noted | [WTS] [JSN] | |
R2-1912108 | [107#65][NR/Power Saving] Running CR for 38.300 (CATT) | discussion | CATT (rapporteur) | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.1 |
endorsed | [WTS] [JSN] | |
R2-1912109 | Stage-3 aspects of PDCCH-WUS | discussion | CATT | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |
R2-1912110 | Remaining issues on UE RRC state transition request | discussion | CATT | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.3 |
not treated | [WTS] [JSN] | |
R2-1912111 | Maximum MIMO layers configuration in power saving | discussion | CATT | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.4 |
noted | [WTS] [JSN] | |
R2-1912112 | UE assistance for SCell | discussion | CATT, Qualcomm Inc., Apple, Huawei, HiSilicon, vivo, Samsung, Intel, MediaTek | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.5 |
noted | [WTS] [JSN] | |
R2-1912113 | Considerations on the criterions of RRM measurement relaxation | discussion | CATT | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1912114 | Available Cell Reselection Measurement Result Reporting | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912115 | Remaining issues of early measurement configurations | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912116 | Considerations on Direct SCell activation in DC/CA Scenarios | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.1 |
not treated | [WTS] [JSN] | |
R2-1912117 | Temporary RS utilization for SCell and SpCell | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |
R2-1912118 | Dormant SCG state | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
not treated | [WTS] [JSN] | |
R2-1912119 | Signalling enhancement for Inactive state | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
not treated | [WTS] [JSN] | |
R2-1912120 | Bearer type negotiation |
discussion revision of R2-1908893 |
CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.2 |
not treated | [WTS] [JSN] | |
R2-1912121 | Common Cell Configuration for Signaling Reduction in NR | discussion | CATT | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.4 |
noted | [WTS] [JSN] | |
R2-1912122 | Bearer type negotiation | discussion | CATT | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
withdrawn | [WTS] [JSN] | |
R2-1912123 | Discussion on BAP Buffer | discussion | CATT | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.4 |
not treated | [WTS] [JSN] | |
R2-1912124 | Pre-emptive BSR | discussion | CATT | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1912125 | Remaining issues with IAB Routing | discussion | CATT | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |
R2-1912126 | Further Discussions on IAB BH RLF | discussion | CATT | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |
R2-1912127 | Summary of the email discussion [106#43][IAB] Backhaul RLF |
discussion revision of R2-1908842 |
CATT | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.1 |
noted | [WTS] [JSN] | |
R2-1912128 | Discussion on multi-beam enhancements | discussion | CATT | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1912129 | Further Considerations on Capability Coordination for DAPS-RUDI | discussion | CATT | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912130 | Remaining PDCP issues for DAPS | discussion | CATT | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1912131 | Further Considerations on CP of DAPS-RUDI | discussion | CATT | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912132 | Discussion on the Working Assumption Related Issues | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |
R2-1912133 | Conditional PScell Addition/Change | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
noted | [WTS] [JSN] | |
R2-1912134 | Further Discussion on Cell Evaluation for CHO Cell Selection | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.5 |
not treated | [WTS] [JSN] | |
R2-1912135 | Coexistence of Simultaneous Connectivity and CHO | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1912136 | Discussion on Signaling Structure of CHO Configuration Message | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1912137 | UE Capability Issue for CHO | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1912138 | Corrections on the premises of HO to E-UTRA | CR | CATT | 36.331 15.7.0 CR#4101 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1912139 | Corrections on the premises of E-UTRA HO to NR | CR | CATT | 38.331 15.7.0 CR#1266 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1912140 | Correction on reestablishRLC |
CR revised to R2-1914614 |
CATT | 36.331 15.7.0 CR#4102 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
not treated | [WTS] [JSN] |
R2-1912141 | Corrections on CG-Config |
CR revised to R2-1914534 |
CATT | 38.331 15.7.0 CR#1267 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
agreed | [WTS] [JSN] |
R2-1912142 | Issues for Log MDT Configuration in DC Scenario |
discussion revision of R2-1908758 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912143 | Detection and Reporting of Out-of-coverage |
discussion revision of R2-1908759 revised to R2-1914500 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912144 | [Draft] LS on MDT Configuration of Event triggered Out-of-coverage |
LS out LS To: RAN3 revision of R2-1908760 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912145 | Clarification of UL Delay Measurement |
discussion revision of R2-1908763 revised to R2-1914503 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | |
R2-1912146 | Uncertainty of L2 Measurement Result Related to URLLC |
discussion revision of R2-1908764 revised to R2-1914504 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | |
R2-1912147 | Output of Email Discussion [107#45][NRSON] RACH and Mobility Robustness Optimisation Checking | discussion | CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1912148 | [Draft] Reply LS on RACH Optimization and Mobility Robustness Optimization |
LS out LS To: RAN3 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1912149 | RACH Report Optimization | discussion | CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1912150 | Recording and Reporting of RACH Failure |
discussion revision of R2-1908767 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1912151 | Consideration on Successful HO Report |
discussion revision of R2-1908768 revised to R2-1914505 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1912152 | Mobility History and State in NR |
discussion revision of R2-1908762 |
CATT | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912153 | Cell Selection and Reselection of NPN cell | discussion | CATT | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912154 | Connection and Mobility Issue for UEs in Idle and Inactive Mode | discussion | CATT | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912155 | Mobility Issue for LEO in NTN System | discussion | CATT | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1912156 | Cell Selection and Reselection Issue between NTN and TN System | discussion | CATT | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912157 | Measurement Issues for NTN System | discussion | CATT | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1912158 | Paging Load in Two Sub-options of Fixed TA | discussion | CATT | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912159 | Discussion on Random Access Procedure for NTN | discussion | CATT | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1912160 | Consideration on the SPS/CG for NTN | discussion | CATT | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1912161 | Discussion on unicast connection setup procedure | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912162 | RLM / RLF procedure in NR V2X Sidelink | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912163 | Resource (Re-) selection function in NR V2X Sidelink | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.4 |
not treated | [WTS] [JSN] | |
R2-1912164 | 38 323 running CR |
draftCR revised to R2-1914111 |
CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1912165 | Remaining Issues on PDCP | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912166 | Resource allocation mode configuration | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912167 | Further discussion on LCP procedure | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912168 | Leftover issues for sidelink configured grant | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1912169 | Prioritization between UL and SL for NR V2X | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912170 | SLRB configurations handling during UE states transition | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
noted | [WTS] [JSN] | |
R2-1912171 | Configuration Procedure of the Bi-directional RLC AM SLRB | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912172 | NR Uu controlling LTE sidelink SPS | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.7 |
not treated | [WTS] [JSN] | |
R2-1912173 | Left Issues of BSR/SR | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1912174 | Admission Control for NR SL | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1912175 | Type 1 Sidelink Configured Grant Validity Time | discussion | CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1912176 | Remaining Issues on RACH Procedure in NR-U | discussion | vivo |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912177 | Remaining Issues on Uplink LBT Failure | discussion | vivo |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |||
R2-1912178 | Issue on the Autonomous BWP Switching in NR-U |
discussion revised to R2-1914366 |
vivo |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |||
R2-1912179 | LBT Impacts on 2-step RACH |
discussion revision of R2-1908692 revised to R2-1914368 |
vivo |
R2-107 AI: 6.2.2.3 |
not treated | [WTS] [JSN] | |||
R2-1912180 | Remaining Issues on Configured Grant in NR-U | discussion | vivo |
R2-107 AI: 6.2.2.5 |
not treated | [WTS] [JSN] | |||
R2-1912181 | CAPC Restriction to Data Multiplexing for Configured Grant |
discussion revision of R2-1908697 revised to R2-1914369 |
vivo |
R2-107 AI: 6.2.2.6 |
not treated | [WTS] [JSN] | |||
R2-1912182 | Introducing More Transmission Opportunities for DL SPS in NR-U |
discussion revision of R2-1909207 |
vivo |
R2-107 AI: 6.2.2.7 |
noted | [WTS] [JSN] | |||
R2-1912183 | On NR-U PHR Handling | discussion | vivo |
R2-107 AI: 6.2.2.7 |
noted | [WTS] [JSN] | |||
R2-1912184 | Further Discussion on the Whitelist in NR-U |
discussion revised to R2-1914372 |
vivo |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |||
R2-1912185 | Enhancements of System Information in NR-U |
discussion revision of R2-1908695 |
vivo |
R2-107 AI: 6.2.3.5 |
noted | [WTS] [JSN] | |||
R2-1912186 | Differentiation Between 2-step and 4-step RACH | discussion | vivo |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |||
R2-1912187 | Remaining Issue on Contention Resolution in 2-step RACH | discussion | vivo |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |||
R2-1912188 | Remaining Issue on Fallback from 2-step to 4-step RACH | discussion | vivo |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |||
R2-1912189 | Resource Selection for MsgA |
discussion revised to R2-1914377 |
vivo |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |||
R2-1912190 | Prioritized RA Parameters for 2-step RACH |
discussion revision of R2-1908705 |
vivo |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |||
R2-1912191 | Discussion on the 2-step CFRA | discussion | vivo |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |||
R2-1912192 | Remaining issues of NR early measurements | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912193 | CR to 38.331 on support of cross-carrier scheduling with different numerology | draftCR | Qualcomm Incorporated, ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.6 |
not treated | [WTS] [JSN] | |
R2-1912194 | Further discussion on NR SCG resume procedure | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
not treated | [WTS] [JSN] | |
R2-1912195 | Discussion on fast SCell activation based on RAN1 / RAN4 reply LS | discussion | Qualcomm Incorporated, Verizon, Vodafone, Sprint, MediaTek Inc., Charter Communications | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
noted | [WTS] [JSN] | |
R2-1912196 | Discussion on common SCell configuration |
discussion revision of R2-1908678 |
Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.4 |
not treated | [WTS] [JSN] | |
R2-1912197 | Introducing suspension of SCG |
discussion revision of R2-1908679 |
Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.4 |
not treated | [WTS] [JSN] | |
R2-1912198 | Remaining issues of Fast MCG Recovery | discussion | Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1912199 | CR to 38.331 on configuration of rach-ConfigCommon in initial UL BWP for RRC triggered BWP switch |
CR revised to R2-1913944 |
Qualcomm Incorporated | 38.331 15.7.0 CR#1344 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.1 |
revised | [WTS] [JSN] |
R2-1912200 | Discussion on procedures in RAT-Dependent positioning methods | discussion | CATT | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.2.1 |
noted | [WTS] [JSN] | |
R2-1912201 | Considerations on Broadcast Positioning Assistance Data | discussion | CATT | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.2.3 |
not treated | [WTS] [JSN] | |
R2-1912202 | Open Issues on Broadcast Positioning Procedure | discussion | CATT | NR_pos-Core | Rel-16 |
R2-107 AI: 6.21 |
not treated | [WTS] [JSN] | |
R2-1912203 | Introduction of B1C signal in BDS system in A-GNSS |
CR revised to R2-2000238 |
CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | 36.305 15.4.0 CR#83 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1912204 | Introduction of B1C signal in BDS system in A-GNSS |
CR revised to R2-1914184 |
CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | 36.355 15.5.0 CR#244 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
revised | [WTS] [JSN] |
R2-1912205 | Introduction of B1C signal in BDS system in A-GNSS |
CR revised to R2-2000240 |
CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | 38.305 15.4.0 CR#13 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1912206 | Re-consideration on PLMN-wide Filter | discussion | CATT | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
not treated | [WTS] [JSN] | |
R2-1912207 | Draft LS on PLMN-wide Filter |
LS out LS To: SA2 |
CATT | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
not treated | [WTS] [JSN] | |
R2-1912208 | Open Issues of Reference Timing Delivery |
discussion revision of R2-1908822 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |
R2-1912209 | Remaining Issues on Multiple Active SPS/CGs | discussion | CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912210 | Discussion on Ethernet Header Compression |
discussion revision of R2-1908825 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |
R2-1912211 | Data/data prioritization |
discussion revised to R2-1914413 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1912212 | Equal-priority handling |
discussion revision of R2-1908828 revised to R2-1914414 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1912213 | SR/PUSCH prioritization |
discussion revision of R2-1908829 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.3 |
not treated | [WTS] [JSN] | |
R2-1912214 | [107#80][NR IIOT] Summary on Deprioritized PDUs (CATT) |
discussion revised to R2-1913955 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
revised | [WTS] [JSN] | |
R2-1912215 | Handling of Dropped MAC PDU |
discussion revision of R2-1908831 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1912216 | The prioritization between MAC CEs and UL data |
discussion revised to R2-1914415 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1912217 | LCP restriction enhancement for reliability | discussion | CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1912218 | On the number of activated legs | discussion | CATT, Fujitsu | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1912219 | PDCP Duplication Configuration and Activation/Deactivation |
discussion revised to R2-1914417 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1912220 | Discussion on UE based Duplication Activation/Deactivation |
discussion revised to R2-1914419 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.2 |
not treated | [WTS] [JSN] | |
R2-1912221 | MAC upgrade for SR dropping in PHY |
discussion revision of R2-1909122 revised to R2-1914420 |
CATT | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | ||
R2-1912222 | BSR trigger issue for CA duplication |
discussion revision of R2-1909123 |
CATT | Rel-16 |
R2-107 AI: 6.20.2 |
noted | [WTS] [JSN] | ||
R2-1912223 | On the remaining open issues of 2-step RACH | discussion | CATT | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |
R2-1912224 | Load balancing between RACH Types | discussion | CATT | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1912225 | Remaining Issue of RA Type Selection |
discussion revised to R2-1914424 |
CATT | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |
R2-1912226 | Open issues of 2-step CFRA | discussion | CATT | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |
R2-1912227 | NR-U RACH enhancements | discussion | SHARP | Rel-16 |
R2-107 AI: 6.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912228 | Report of email discussion [107#56][NB-IoT R15] | discussion | NTT DOCOMO INC. | Rel-15 |
R2-107 AI: 4.1 |
noted | [WTS] [JSN] | ||
R2-1912229 | CE Mode Threshold Adjustments for non-BL and BL UE |
discussion revised to R2-1914474 |
NTT DOCOMO INC. | Rel-16 |
R2-107 AI: 7.1.13 |
not treated | [WTS] [JSN] | ||
R2-1912230 | Discussion on capability transfer procedure for NR V2X | discussion | Spreadtrum Communications |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |||
R2-1912231 | Discussion on SLRB configuration alignment | discussion | Spreadtrum Communications |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912232 | Asymmetric UL and DL frame timing at gNB side | discussion | Spreadtrum Communications |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912233 | Discussion on communication range in V2X | discussion | Spreadtrum Communications |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1912234 | Logical channel prioritization Consideration | discussion | Spreadtrum Communications |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912235 | Consideration on activation/deactivation of PDCP duplication | discussion | Spreadtrum Communications |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912236 | Consideration on early measurement reporting |
discussion revision of R2-1909086 |
Spreadtrum Communications |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |||
R2-1912237 | Early measurement in NR-U |
discussion revision of R2-1909107 |
Spreadtrum Communications |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |||
R2-1912238 | Enhancements of resuming MR-DC configuration for RRC_INACTIVE | discussion | Spreadtrum Communications |
R2-107 AI: 6.10.4.3 |
not treated | [WTS] [JSN] | |||
R2-1912239 | Mobility Consideration in NR-U |
discussion revision of R2-1909082 |
Spreadtrum Communications |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |||
R2-1912240 | Measurement report enhancement in conditional handover |
discussion revision of R2-1909083 revised to R2-1915022 |
Spreadtrum Communications |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912241 | RRC signaling size restriction in CHO |
discussion revision of R2-1909084 revised to R2-1915023 |
Spreadtrum Communications |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |||
R2-1912242 | PSCell Conditional Change Considerations | discussion | Spreadtrum Communications |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |||
R2-1912243 | LBT Failures Handling in Non-Connected State | discussion | Spreadtrum Communications, Huawei, HiSilicon |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |||
R2-1912244 | Inconsecutive UL LBT Failures Handling | discussion | Spreadtrum Communications |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |||
R2-1912245 | Consideration on Logged MDT Report in MR-DC | discussion | Spreadtrum Communications |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |||
R2-1912246 | Handling of periodicity misalignment between CG periodicity and TSN traffic periodicity | discussion | Spreadtrum Communications |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912247 | Discussion on CG and CG collision of equal priority | discussion | Spreadtrum Communications |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |||
R2-1912248 | Consideration on packet based duplication | discussion | Spreadtrum Communications |
R2-107 AI: 6.7.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912249 | Some remaining issues on UE capability ID |
discussion revision of R2-1909091 |
Spreadtrum Communications |
R2-107 AI: 6.5.2 |
not treated | [WTS] [JSN] | |||
R2-1912250 | Filter ID for the selection of UE capability ID |
discussion revision of R2-1909090 |
Spreadtrum Communications |
R2-107 AI: 6.5.2 |
not treated | [WTS] [JSN] | |||
R2-1912251 | Discussion on the SuccessRAR for SI request | discussion | Spreadtrum Communications |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |||
R2-1912252 | Running CR to 37324 for 5G_V2X_NRSL |
draftCR revised to R2-1914112 |
vivo (Rapporteur) | 5G_V2X_NRSL-Core | Rel-15 |
R2-107 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1912253 | Left Issues on NR SL RLC and PDCP |
discussion revised to R2-1914922 |
vivo |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912254 | Uplink and Sidelink transmission prioritization in NR V2X |
discussion revision of R2-1910215 |
vivo |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912255 | Indication and resource configuration on HARQ enable disable | discussion | vivo |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912256 | Discussion on SR and BSR |
discussion revised to R2-1914928 |
vivo |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |||
R2-1912257 | Discussion on Truncated Sidelink BSR |
discussion revision of R2-1910227 revised to R2-1914929 |
vivo |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |||
R2-1912258 | Remaining issues on sidelink configured grant |
discussion revision of R2-1910211 revised to R2-1914930 |
vivo |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |||
R2-1912259 | Left issues for PC5-S messages | discussion | vivo |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |||
R2-1912260 | Discussion on sideink radio link management on TX and RX UE |
discussion revision of R2-1910212 |
vivo |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |||
R2-1912261 | Remaining issues on PC5-RRC message exchange |
discussion revision of R2-1910213 |
vivo |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |||
R2-1912262 | UE ID across multiple PC5-S links |
discussion revision of R2-1910214 |
vivo |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |||
R2-1912263 | Report of 107#73 NR V2X SDAP(vivo) |
discussion revised to R2-1913948 |
vivo |
R2-107 AI: 6.4.6 |
revised | [WTS] [JSN] | |||
R2-1912264 | Left issues on SLRB configuration | discussion | vivo |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1912265 | Admission and Congestion control in NR V2X |
discussion revision of R2-1910220 |
vivo |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1912266 | Mode switch for QoS guarantee in NR V2X |
discussion revision of R2-1910221 revised to R2-1914934 |
vivo |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1912267 | Remaining issues about NR SL QoS handling |
discussion revision of R2-1910226 |
vivo |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1912268 | Running CR to 37.340 for CA_DC enhancements |
draftCR revised to R2-1916642 |
vivo, Ericsson | LTE_NR_DC_CA_enh-Core | Rel-15 |
R2-107 AI: 6.10.1 |
not treated | [WTS] [JSN] | |
R2-1912269 | Power control for NR-DC |
discussion revision of R2-1909193 revised to R2-1914937 |
vivo |
R2-107 AI: 6.10.2 |
not treated | [WTS] [JSN] | |||
R2-1912270 | Report of [107#35][NR/DCCA] Remaining aspects of early measurement configuration (vivo) | discussion | vivo |
R2-107 AI: 6.10.3 |
noted | [WTS] [JSN] | |||
R2-1912271 | Early Measurement Reporting for INACTIVE State |
discussion revision of R2-1909195 revised to R2-1914939 |
vivo |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |||
R2-1912272 | UE measurement behaviour regarding autonomous state transition |
discussion revision of R2-1909196 revised to R2-1914940 |
vivo |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |||
R2-1912273 | IDC impact for early measurement |
discussion revision of R2-1909198 revised to R2-1914941 |
vivo |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |||
R2-1912274 | Discussion on fast radio link recovery |
discussion revision of R2-1909199 revised to R2-1914942 |
vivo |
R2-107 AI: 6.10.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912275 | Behavior of dormancy SCell and Scell activation | discussion | vivo |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912276 | Minimize signaling overhead for cell setup of MR-DC |
discussion revision of R2-1909202 |
vivo |
R2-107 AI: 6.10.4.4 |
not treated | [WTS] [JSN] | |||
R2-1912277 | Remaining issues on MCG fast recovery |
discussion revision of R2-1909203 revised to R2-1914945 |
vivo |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |||
R2-1912278 | UE capability parameters for SON_MDT | discussion | vivo |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |||
R2-1912279 | Running CR to 38.306 for NR_SON_MDT | discussion | vivo | NR_SON_MDT-Core |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | ||
R2-1912280 | Autonomous Gap capability for CGI reporting | discussion | vivo, Ericsson |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |||
R2-1912281 | [Draft] Reply LS on autonomous gap capability |
LS out LS To: RAN4 |
vivo |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |||
R2-1912282 | SMTC for sync SSB frequency and non-sync SSB frequency | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912283 | UE measurement behavior due to lower priority frequency and OOS | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912284 | Fast Scell activation in sTAG | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |
R2-1912285 | Introduction of dormancy behavior in NR |
discussion revised to R2-1913942 |
OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
revised | [WTS] [JSN] | |
R2-1912286 | Supporting RRC reestablishment to SN RAT cell | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1912287 | RRC Resume for MR-DC with 5GC | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
not treated | [WTS] [JSN] | |
R2-1912288 | SCell or SCG activation in RRC_INACTIVE | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.1 |
not treated | [WTS] [JSN] | |
R2-1912289 | Security algorithom update in RRC reestablishment message | discussion | OPPO,Huawei | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | ||
R2-1912290 | Configuration limitation for RRCRelease message in R15 |
CR revised to R2-1914128 |
OPPO | 38.331 15.7.0 CR#1268 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.7 |
revised | [WTS] [JSN] |
R2-1912291 | Discussion on Cached Data Handling for INACTIVE UE | discussion | OPPO | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | ||
R2-1912292 | Discussion on DRB IP failure handling and data recovery | discussion | OPPO | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | ||
R2-1912293 | Open issues for early measurement | discussion | OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912294 | Lossless Make-Before-Break (MBB) HO support for Low latency, high reliability services | discussion | Qualcomm Incorporated |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912295 | Source connection handling during Make-Before-Break (MBB) HO | discussion | Qualcomm Incorporated |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912296 | DAPS HO support for simultaneous Tx not feasible scenarios | discussion | Qualcomm Incorporated |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912297 | Conditional NR PSCell addition/change procedures | discussion | Qualcomm Incorporated |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |||
R2-1912298 | Conditional NR PSCell addition/change failure handling | discussion | Qualcomm Incorporated |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |||
R2-1912299 | Supporting per DRB MBB HO configuration | discussion | Qualcomm Incorporated |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912300 | Support Tx sharing during DAPS HO | discussion | Qualcomm Incorporated |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912301 | Remaining Aspects of Configured Grant Transmission for NR-U | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.2.5 |
noted | [WTS] [JSN] | |||
R2-1912302 | Remaining issues on 4-step RACH for NR-U | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |||
R2-1912303 | Running CR for NR-based Access to Unlicensed Spectrum |
draftCR revised to R2-1914002 |
Qualcomm Incorporated | NR_unlic-Core | Rel-15 |
R2-107 AI: 6.2.1 |
revised | [WTS] [JSN] | |
R2-1912304 | Details of the Uplink LBT failure mechanism | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.2.2 |
noted | [WTS] [JSN] | |||
R2-1912305 | Broadcasting of System Information in NR-U | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.3.5 |
noted | [WTS] [JSN] | |||
R2-1912306 | Support for Indian Navigation Satellite System (NavIC) |
discussion revised to R2-1914767 |
Reliance Jio | Rel-16 |
R2-107 AI: 7.7 |
not treated | [WTS] [JSN] | ||
R2-1912307 | Remaining Issues on Ethernet Header Compression | discussion | China Telecommunications |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |||
R2-1912308 | Fast Recovery with CA | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1912309 | Consideration on idle and inactive mode procedures | discussion | Huawei, HiSilicon, China Telecom | NG_RAN_PRN | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912310 | Consideration on connected mode procedures | discussion | Huawei, HiSilicon | NG_RAN_PRN | Rel-16 |
R2-107 AI: 6.18.3 |
not treated | [WTS] [JSN] | |
R2-1912311 | Propagation delay compensation for reference time |
discussion revised to R2-1914959 |
vivo |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912312 | Email discussion summary on EHC | discussion | vivo |
R2-107 AI: 6.7.2.3 |
noted | [WTS] [JSN] | |||
R2-1912313 | Remaining issues for EHC |
discussion revised to R2-1914960 |
vivo |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |||
R2-1912314 | TP on TS 38.323 of EHC | discussion | vivo |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |||
R2-1912315 | TP on TS 38.331 of EHC | discussion | vivo |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |||
R2-1912316 | Discussion on the periodicity misalignment between TSC traffic and SPS/CG |
discussion revision of R2-1910006 revised to R2-1914962 |
vivo |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912317 | URLLC transmission within measurement gap |
discussion revision of R2-1910009 revised to R2-1914964 |
vivo |
R2-107 AI: 6.7.3.4 |
not treated | [WTS] [JSN] | |||
R2-1912318 | SPS and CG configuration issue on the partial overlapping TSN traffic pattern |
discussion revision of R2-1910010 revised to R2-1914965 |
vivo |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | |||
R2-1912319 | Reliability-based LCP Restriction Enhancement for DG | discussion | vivo |
R2-107 AI: 6.7.3.4 |
not treated | [WTS] [JSN] | |||
R2-1912320 | Discussion on the MAC PDU recovery procedure |
discussion revised to R2-1914966 |
vivo |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |||
R2-1912321 | Remaining issues of the network-controlled duplication |
discussion revised to R2-1914967 |
vivo |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912322 | Remaining issue for the priority of PUSCH and SR | discussion | vivo |
R2-107 AI: 6.7.3.3 |
not treated | [WTS] [JSN] | |||
R2-1912323 | Discussion on the PUSCH priority based on MAC CE | discussion | vivo |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |||
R2-1912324 | Discussion on the LCP restriction for CA duplication | discussion | vivo |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |||
R2-1912325 | Adding the Phase Bias Indicator to the SSR Phase Bias message | discussion | Swift Navigation |
R2-107 AI: 6.8.2.2 |
not treated | [WTS] [JSN] | |||
R2-1912326 | Correction on PUCCH transform precoding | draftCR | vivo, Nokia (rapporteur) | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.1 |
agreed | [WTS] [JSN] | |
R2-1912327 | Cell re-selection during RRC connection resume |
draftCR revised to R2-1914686 |
vivo | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.6 |
not treated | [WTS] [JSN] | |
R2-1912328 | Discussion on LS about beamSwitchTiming value of 224 and 336 | discussion | vivo, Huawei, Hisilicon | TEI16 | Rel-16 |
R2-107 AI: 6.20.3 |
agreed | [WTS] [JSN] | |
R2-1912329 | Introduction of NR IDC solution |
draftCR revised to R2-1914688 |
vivo | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1912330 | WUS impact on Short DRX cycle | discussion | vivo, Qualcomm Inc., Spreadtrum, Huawei, Hisilicon | FS_NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.2 |
noted | [WTS] [JSN] | |
R2-1912331 | WUS impact upon BWP switching |
discussion revised to R2-1914691 |
vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |
R2-1912332 | Stage-3 design for per-BWP MIMO layer adaptation | discussion | vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.4 |
not treated | [WTS] [JSN] | |
R2-1912333 | UE assistance information for power saving | discussion | vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.5 |
not treated | [WTS] [JSN] | |
R2-1912334 | RRM measurement relaxation criteria | discussion | vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1912335 | UE Power Consumption Reduction in RRM Measurement | discussion | vivo | FS_NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1912336 | Summary of EmailDis-78 on MAC aspects for mobility enhancement | discussion | vivo (rapporteur) | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
noted | [WTS] [JSN] | |
R2-1912337 | Summary of EmailDis-78 on Text Proposal for 38321 of mobility | discussion | vivo (rapporteur) | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
not treated | [WTS] [JSN] | |
R2-1912338 | Summary of EmailDis-78 on Text Proposal for 36321 of mobility | discussion | vivo (rapporteur) | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
not treated | [WTS] [JSN] | |
R2-1912339 | Conditional Handover without explict trigger condition |
discussion revision of R2-1910684 revised to R2-1914697 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1912340 | Discussion on CHO release |
discussion revised to R2-1914698 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1912341 | Discussion on the HOF for CHO |
discussion revision of R2-1909538 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.2 |
withdrawn | [WTS] [JSN] | |
R2-1912342 | Discussion on the number of prepared cells for CHO |
discussion revision of R2-1909537 revised to R2-1914699 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1912343 | Conditional PSCell addition and change |
discussion revised to R2-1914703 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1912344 | Text proposal for conditional PSCell addition and change | discussion | vivo | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1912345 | Discussion on the selective PDCP retransmission at UL PDCP PDU switching | discussion | vivo | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1912346 | Discussion on the ROHC failure issue | discussion | vivo | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1912347 | Clarificaiton on the reordering after ROHC decompression for NR PDCP | discussion | vivo | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1912348 | Issue on the potential duplicated PDCP packets at the network side | discussion | vivo | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1912349 | Summary of Email Discussion on CP for DAPS | discussion | vivo (rapporteur) | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
noted | [WTS] [JSN] | |
R2-1912350 | Discussion on the signaling procedures of the RUDI HO |
discussion revised to R2-1914708 |
vivo | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912351 | RAN2 specification impacts of SCell BFR | discussion | vivo | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1912352 | Text proposal for 38.321 of SCell BFR | discussion | vivo | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1912353 | Text proposal for 38.331 of SCell BFR | discussion | vivo | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1912354 | Data forwarding in RUDI HO | discussion | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1912355 | ROHC handling in RUDI HO | discussion | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1912356 | Uplink handling in RUDI HO |
discussion revised to R2-1914620 |
Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
not treated | [WTS] [JSN] | |
R2-1912357 | Handover interruption reduction for UM bearers |
discussion revised to R2-1914621, R2-1915768 |
Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | |
R2-1912358 | Control plane handling in RUDI HO | discussion | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912359 | TDM pattern for single uplink in RUDI HO | discussion | Ericsson | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
not treated | [WTS] [JSN] | |
R2-1912360 | Further aspects of SNPN | discussion | Ericsson | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912361 | Further aspects of PNI-NPN | discussion | Ericsson | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912362 | Introduction of Multiple LTE-CRS-RateMatchPatterns |
CR revision of R2-1908986 |
Ericsson | 38.331 15.7.0 CR#11291 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.3 |
withdrawn | [WTS] [JSN] |
R2-1912363 | PDCP version in EN-DC | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
noted | [WTS] [JSN] | |
R2-1912364 | PDCP version in EN-DC |
CR revised to R2-1914122 |
Ericsson | 37.34 15.7.0 CR#155 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1912365 | Remaining issues for routing | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |
R2-1912366 | Remaining issues for bearer mapping | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.2 |
not treated | [WTS] [JSN] | |
R2-1912367 | Flow control for IAB networks | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |
R2-1912368 | BAP PDU format | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.4 |
not treated | [WTS] [JSN] | |
R2-1912369 | Remaining issues for uplink scheduling enhancement | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1912370 | LCID and LCG space extension for IAB backhaul link | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.2 |
noted | [WTS] [JSN] | |
R2-1912371 | General RLC impacts | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.3 |
not treated | [WTS] [JSN] | |
R2-1912372 | RACH related issues for IAB | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.3 |
not treated | [WTS] [JSN] | |
R2-1912373 | Support of UE PDCP duplication | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.3 |
not treated | [WTS] [JSN] | |
R2-1912374 | Backhaul RLF Recovery | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |
R2-1912375 | BAP and RLC configurations | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.2 |
not treated | [WTS] [JSN] | |
R2-1912376 | Cell (re)Selection and Access Control and Connection Establishment | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.3 |
not treated | [WTS] [JSN] | |
R2-1912377 | Running CR to TS 38.331 for 5G V2X with NR sidelink | draftCR | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-15 |
R2-107 AI: 6.4.1 |
not treated | [WTS] [JSN] | |
R2-1912378 | Discussion on multi-mode co-existence | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |||
R2-1912379 | Consideration on mode1 resource allocation | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |||
R2-1912380 | Discussion on UL and SL prioritisation | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.2 |
noted | [WTS] [JSN] | |||
R2-1912381 | Consideration on NR V2X CBR | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912382 | Discussion on left issue in NR V2X PDCP | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912383 | Left issues for MAC in NR V2X | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912384 | Considerations on sidelink RLC | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912385 | Discussion on PC5 RRC procedure for unicast | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |||
R2-1912386 | Discussion on remaining issues on SLRB parameters | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1912387 | Discussion on SDAP issues | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912388 | Consideration on sidelink RLM management | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912389 | Consideration on exceptional resource pool and system information acquisition | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912390 | Consideration on NR V2X cross RAT support | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.7 |
not treated | [WTS] [JSN] | |||
R2-1912391 | SLRB maintenance during RRC state transition | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912392 | (running)36.304CR on cell selection(reselection) for NR V2X UE |
draftCR revised to R2-1914115 |
ZTE Corporation, Sanechips | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1912393 | (running)38.304CR on cell selection(reselection) for NR V2X UE |
draftCR revised to R2-1914116 |
ZTE Corporation, Sanechips | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1912394 | Consideration on the issue of SI update | discussion | Beijing Xiaomi Mobile Software | Rel-16 |
R2-107 AI: 6.21 |
not treated | [WTS] [JSN] | ||
R2-1912395 | Indication of contentionDetected per SSB | discussion | Beijing Xiaomi Mobile Software | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | ||
R2-1912396 | DRX enhancement for NR-U |
discussion revision of R2-1905731 revised to R2-1915945 |
Xiaomi Communications | Rel-16 |
R2-107 AI: 6.2.2.4 |
not treated | [WTS] [JSN] | ||
R2-1912397 | Consideration on MDT in NR |
discussion revision of R2-1909213 |
Xiaomi Communications | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | ||
R2-1912398 | Consideration on SR transmission |
discussion revision of R2-1909215 revised to R2-1915956 |
Xiaomi Communications | Rel-16 |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | ||
R2-1912399 | Consideration on the blind SCG configuration | discussion | Beijing Xiaomi Mobile Software | Rel-16 |
R2-107 AI: 6.10.4.3 |
not treated | [WTS] [JSN] | ||
R2-1912400 | PCell monitoring during conditional PSCell addition/change | discussion | OPPO | LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1912401 | PCell monitoring during conditional PSCell addition/change | discussion | OPPO | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1912402 | Discussion on T312 for PSCell | discussion | OPPO | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.4 |
not treated | [WTS] [JSN] | |
R2-1912403 | UL switching time for DAPS HO | discussion | OPPO | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
not treated | [WTS] [JSN] | |
R2-1912404 | Correction on RRC Resume procedure |
CR revised to R2-1916047 |
OPPO | 38.331 15.7.0 CR#1269 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.6 |
not treated | [WTS] [JSN] |
R2-1912405 | Revision to Non-Terrestrial Networks scenarios |
pCR revised to R2-1914721 |
HUGHES Network Systems Ltd | 38.821 0.7.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.2 |
not treated | [WTS] [JSN] |
R2-1912406 | Remaining issues on UE capability ID |
discussion revised to R2-1915265 |
Huawei, HiSilicon | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
not treated | [WTS] [JSN] | |
R2-1912407 | Remaining issues on UE capability segmentation |
discussion revised to R2-1915266 |
Huawei, HiSilicon | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.3 |
noted | [WTS] [JSN] | |
R2-1912408 | UE CLI Measurement Configuration, Reporting and NW Signalling | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] | ||
R2-1912409 | [DRAFT] LS For Exchange of related to UE CLI measurement configuration and reporting |
LS out LS To: RAN3 revised to R2-1914013 |
Nokia, Nokia Shanghai Bell | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
revised | [WTS] [JSN] | |
R2-1912410 | GWUS Configuration and Resource mapping for UE-Group Information | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-107 AI: 7.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912411 | Remaining Issues for D-PUR Signalling Procedure | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1912412 | D-PUR for Control Plane Solution | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1912413 | Further analysis of Msg4 based MT EDT | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-107 AI: 7.1.2 |
noted | [WTS] [JSN] | ||
R2-1912414 | Running CR for 36.304 -Rel-16 eMTC Enhancements |
discussion revised to R2-1914042 |
Nokia, Nokia Shanghai Bell | Rel-16 |
R2-107 AI: 7.1.1 |
revised | [WTS] [JSN] | ||
R2-1912415 | Source PS Release of PDCP DAPS during RUDI Handover | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | ||
R2-1912416 | Broadcast of Barometric Pressure Assistance Data | discussion | Polaris Wireless, FirstNet, Intel, AT&T, NextNav | TEI16, LCS_LTE_acc_enh-Core |
R2-107 AI: 7.6 |
not treated | [WTS] [JSN] | ||
R2-1912417 | Running 36.300 CR for LTE_feMob |
draftCR revised to R2-1914007 |
China Telecom Corporation Ltd. | LTE_feMob-Core | Rel-15 |
R2-107 AI: 7.3.1 |
revised | [WTS] [JSN] | |
R2-1912418 | Correction to applicability of UP IP in NR | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.8 |
noted | [WTS] [JSN] | |
R2-1912419 | Correction to applicability of UP IP in NR | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.8 |
not pursued | [WTS] [JSN] | |
R2-1912420 | Operation Principles of PC5 RRC Connection | discussion | Futurewei | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912421 | Sensor Provide Location Information Element Correction | discussion | Polaris Wireless | TEI16 |
R2-107 AI: 7.6 |
not treated | [WTS] [JSN] | ||
R2-1912422 | Sensor Provide Location Information Elements Correction |
CR revised to R2-1914074 |
Polaris Wireless | 36.355 15.5.0 CR#245 catF | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
revised | [WTS] [JSN] |
R2-1912423 | Remaining Issues for Extending RAR Window | discussion | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |
R2-1912424 | Contention Resolution Timer Handling in NR-U | discussion | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912425 | Signaling Multiple UL grants for Msg3 Transmission in NR-U | discussion | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912426 | Draft RRC CR_Supporting RAR Window Size larger than 10ms in NR-U | draftCR | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912427 | Random Access Resource Selection in NR-U | discussion | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912428 | Draft RRC CR for supporting Additional Opportunities for paging in NR-U | draftCR | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.1 |
not treated | [WTS] [JSN] | |
R2-1912429 | Handling MIB_SIB1 Acquisition Failure | discussion | Samsung Electronics Co., Ltd | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.2 |
noted | [WTS] [JSN] | |
R2-1912430 | 2 Step RA_12bit Timing Advanced Information | discussion | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |
R2-1912431 | 2 Step RA_RACH prioritisation | discussion | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1912432 | 2 Step RACH_RNTI for Receiving Network Response | discussion | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1912433 | 2 Step RA_RACH Configuration | discussion | Samsung Electronics Co., Ltd | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.4 |
not treated | [WTS] [JSN] | |
R2-1912434 | Impact of Mode 1 Resource Allocation on Uu BWP Operation | discussion | Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1912435 | RRC Connection Initiation Trigger for V2X Sidelink Communication | discussion | Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912436 | RAN2 Aspects of SCell BFR | discussion | Samsung Electronics Co., Ltd | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1912437 | Discussion on (preventing) access to NPN only cell | discussion | Samsung Electronics Co., Ltd | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912438 | UE reporting for mobility optimization | discussion | vivo |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |||
R2-1912439 | Bi-directional UE capability transfer procedure for NR V2X unicast |
discussion revision of R2-1911321 |
Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
noted | [WTS] [JSN] | |
R2-1912440 | Remaining Issues on Handling of SLRB configuration | discussion | Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1912441 | AS-layer configuration failure case in SL unicast |
discussion revision of R2-1911324 revised to R2-1916213 |
Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912442 | Discussion on handling of PC5-S messages for NR V2X unicast |
discussion revision of R2-1911325 |
Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912443 | Discussion on Sidelink UE Information Initiation Trigger for NR V2X Sidelink Communication |
discussion revision of R2-1907966 |
Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912444 | Interaction between RRC Connection Resume Condition and RNAU for NR V2X SL Communication |
discussion revision of R2-1911328 revised to R2-1916216 |
Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912445 | Remaining Issues on SL RLM/RLF Declaration for NR V2X Unicast |
discussion revision of R2-1911329 |
Samsung Electronics Co., Ltd | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912446 | Correction on H1 and H2 events |
CR revised to R2-1913989 |
Samsung Electronics Co., Ltd | 36.331 15.7.0 CR#4103 catF | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
revised | [WTS] [JSN] |
R2-1912447 | Support of inter-RAT HO from SA to EN-DC in Rel-16 | discussion | China Telecom, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | ||
R2-1912448 | Stage2 CR-Support of Inter-RAT HO between NR to EN-DC in Rel-16 | CR | China Telecom, NTT DOCOMO, Huawei, Ericsson, ZTE, OPPO, Mediatek, VIVO | 37.34 15.7.0 CR#156 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912449 | Further discussion on MCG failure recovery via SRB3 | discussion | SHARP Corporation |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |||
R2-1912450 | Discussion on priority value in LTE V2X | discussion | SHARP Corporation |
R2-107 AI: 4.3 |
noted | [WTS] [JSN] | |||
R2-1912451 | Correction on priority values in LTE V2X | draftCR | SHARP Corporation | LTE_V2X-Core | Rel-14 |
R2-107 AI: 4.3 |
not treated | [WTS] [JSN] | |
R2-1912452 | Correction on priority values in LTE V2X | draftCR | SHARP Corporation | LTE_V2X-Core | Rel-15 |
R2-107 AI: 4.3 |
not treated | [WTS] [JSN] | |
R2-1912453 | Correction on value of sensing priority for sidelink mode 3 sensing measurement | draftCR | SHARP Corporation | LTE_eV2X | Rel-15 |
R2-107 AI: 4.3 |
not treated | [WTS] [JSN] | |
R2-1912454 | Discussion on the timer design for CHO | discussion | vivo | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |
R2-1912455 | CAPC for RACH and PUCCH in NR-U |
discussion revision of R2-1908849 revised to R2-1914582 |
Mediatek India Technology Pvt. | Rel-16 |
R2-107 AI: 6.2.2.6 |
not treated | [WTS] [JSN] | ||
R2-1912456 | SI scheduling enhancements for NR-U |
discussion revision of R2-1908850 |
Mediatek India Technology Pvt. | Rel-16 |
R2-107 AI: 6.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912457 | On Restrictions in Multiplexing of High and Low Priority LCH in NR-U |
discussion revision of R2-1908851 revised to R2-1914583 |
Mediatek India Technology Pvt. | Rel-16 |
R2-107 AI: 6.2.2.5 |
not treated | [WTS] [JSN] | ||
R2-1912458 | On Reusing Overheating Assistance Information for UE Power Saving | discussion | Samsung | NR_UE_pow_sav-Core |
R2-107 AI: 6.11.5 |
not treated | [WTS] [JSN] | ||
R2-1912459 | On Triggering RRM Measurement Relaxation | discussion | Samsung | NR_UE_pow_sav-Core |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | ||
R2-1912460 | Leg Selection for Non-duplicated Data Transmission | discussion | Apple | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1912461 | LCH-to-cell Restriction for CA Duplication Deactivation | discussion | Apple, Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
noted | [WTS] [JSN] | |
R2-1912462 | Selective PDCP Duplication Enhancement |
discussion revision of R2-1909857 |
Apple | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.2 |
not treated | [WTS] [JSN] | |
R2-1912463 | UE based PDCP Duplication Enhancement |
discussion revision of R2-1909856 |
Apple | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.2 |
not treated | [WTS] [JSN] | |
R2-1912464 | Consecutive Conditional Handover |
discussion revision of R2-1909862 revised to R2-1914513 |
Apple | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1912465 | UE Measurement in SCell Dormant State |
discussion revision of R2-1909865 |
Apple | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |
R2-1912466 | PCell Fast Recovery |
discussion revision of R2-1909864 |
Apple | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1912467 | UE Assistance Information for EN-DC |
discussion revision of R2-1909868 |
Apple | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.5 |
not treated | [WTS] [JSN] | |
R2-1912468 | MsgB Retransmission Scheme | discussion | Apple | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1912469 | 2-step CFRA | discussion | Apple | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |
R2-1912470 | SCell BFR Operation | discussion | Apple | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1912471 | Considering top N cells for PLMN Selection | discussion | Samsung | NR_unlic-Core |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | ||
R2-1912472 | RLM for NR-U | discussion | Samsung | NR_unlic-Core |
R2-107 AI: 6.2.3.4 |
not treated | [WTS] [JSN] | ||
R2-1912473 | On Supporting Make-Before-Break in NR | discussion | Samsung | NR_Mob_enh-Core |
R2-107 AI: 7.3.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912474 | Recovery of consistent UL LBT failures | discussion | Samsung | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912475 | Remaining issues on CAPC | discussion | Samsung | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.6 |
not treated | [WTS] [JSN] | |
R2-1912476 | To reduce SCell activation delay in NR |
discussion revision of R2-1909126 revised to R2-1915223 |
Samsung | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |
R2-1912477 | Support of unaligned frame boundary for inter-band TDD CA |
discussion revised to R2-1915224 |
Samsung | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.7 |
not treated | [WTS] [JSN] | |
R2-1912478 | TA handling in 2-step RACH |
discussion revision of R2-1909127 revised to R2-1915225 |
Samsung | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |
R2-1912479 | Introducing Make-Before-Break in NR | draftCR | Samsung | NR_Mob_enh-Core | Rel-15 |
R2-107 AI: 7.3.2.3 |
not treated | [WTS] [JSN] | |
R2-1912480 | (De)Prioritizing the Access for IAB Setup | discussion | Samsung | NR_IAB-Core |
R2-107 AI: 6.1.5.3 |
not treated | [WTS] [JSN] | ||
R2-1912481 | Including RSSI and Channel Occupancy in Connected Mode Measurements |
draftCR revision of R2-1908852 |
Mediatek India Technology Pvt. | FS_NR_newRAT, NR_newRAT | Rel-15 |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |
R2-1912482 | Accessibility Measurements for NR MDT | discussion | Samsung | NR_SON_MDT-Core |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | ||
R2-1912483 | Details on Event-triggered Logged MDT | discussion | Samsung | NR_SON_MDT-Core |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | ||
R2-1912484 | CAPC Assignments for SRBs in NR-U |
draftCR revision of R2-1908854 |
Mediatek India Technology Pvt. | FS_NR_newRAT, NR_newRAT | Rel-15 |
R2-107 AI: 6.2.2.6 |
not treated | [WTS] [JSN] | |
R2-1912485 | Further Logged Information in NR MDT | discussion | Samsung | NR_SON_MDT-Core |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | ||
R2-1912486 | NR RLF Report | discussion | Samsung | NR_SON_MDT-Core |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | ||
R2-1912487 | On Providing Mobility State and Mobility History Information in NR | discussion | Samsung | NR_SON_MDT-Core |
R2-107 AI: 6.12.2 |
withdrawn | [WTS] [JSN] | ||
R2-1912488 | On Providing Mobility State and Mobility History Information in NR | discussion | Samsung | NR_SON_MDT-Core |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | ||
R2-1912489 | SLRB Reconfiguration Handling |
discussion revised to R2-1916220 |
Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1912490 | Discussion on MCG Fast Recovery | discussion | Samsung | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1912491 | Discussion on FailureInformation |
discussion revision of R2-1911457 |
Samsung | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
withdrawn | [WTS] [JSN] | |
R2-1912492 | DL Reordering Problem at MCG Link Recovery | discussion | Samsung | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1912493 | Remaining Issues on Efficient Transition | discussion | Samsung | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.3 |
noted | [WTS] [JSN] | |
R2-1912494 | Support of Multiple Active CG/SPS Configuration | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912495 | Prioritization of SR Transmission for URLLC |
discussion revision of R2-1911463 revised to R2-1915340 |
Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.3 |
not treated | [WTS] [JSN] | |
R2-1912496 | Split Bearer Fallback at Deactivation of PDCP Duplication |
discussion revision of R2-1911462 revised to R2-1916222 |
Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1912497 | Configuration and initial state of PDCP duplication |
discussion revision of R2-1911458 revised to R2-1916223 |
Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1912498 | Leftover Issues on Accurate Timing Delivery | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |
R2-1912499 | Discussion on UE Autonomous PDCP Duplication |
discussion revision of R2-1911465 |
Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.2 |
not treated | [WTS] [JSN] | |
R2-1912500 | Priority of MAC PDU and MAC CE | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1912501 | Transmission of Deprioritized Data | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1912502 | LCP Restriction on Reliability | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
noted | [WTS] [JSN] | |
R2-1912503 | MAC CE Format for RLC Activiation | discussion | Samsung | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1912504 | Discussion on RLM for LTE mobility enhancement | discussion | OPPO | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912505 | Further details on dual active protocol stack | discussion | OPPO | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
not treated | [WTS] [JSN] | |
R2-1912506 | Further considerations on capability coordination | discussion | OPPO | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912507 | Clarification on HRNN reporting | discussion | OPPO | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912508 | Discussion on SIB1 design for NPN | discussion | OPPO | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912509 | Discussion on SCell BFR | discussion | OPPO | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | |
R2-1912510 | MAC CE format to indicate up to two TCI states | discussion | OPPO | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | |
R2-1912511 | MAC CE format to indicate up to 2 TCI state per indication | draftCR | OPPO | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | |
R2-1912512 | Including RSSI and Channel Occupancy in NR-U UE Capabilities |
draftCR revision of R2-1908855 |
Mediatek India Technology Pvt. | FS_NR_newRAT, NR_newRAT | Rel-16 |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |
R2-1912513 | Further considerations for the segmented UECapabilityInformation |
discussion revised to R2-1915246 |
Samsung | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.3 |
not treated | [WTS] [JSN] | |
R2-1912514 | MAC CE design for support of multiple beam indication for single PDCCH-based multiple TRPs |
discussion revision of R2-1911359 revised to R2-1915247 |
Samsung | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | |
R2-1912515 | Further considerations of support for multi-PDCCH based multi-TRP operation | discussion | Samsung | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.3 |
not treated | [WTS] [JSN] | |
R2-1912516 | Discussion on the additional UE capability filtering to limit the total number of carriers in NR |
discussion revision of R2-1911362 revised to R2-1915249 |
Samsung | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1912517 | Additional UE capability filtering to limit the total number of carriers in NR | CR | Samsung | 38.331 15.7.0 CR#1270 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912518 | Additional UE capability filtering to limit the total number of carriers in NR | CR | Samsung | 38.306 15.7.0 CR#170 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912519 | SSR Atmospheric Correction Points Area Definition | discussion | u-blox AG | Rel-16 |
R2-107 AI: 6.8.2.2 |
not treated | [WTS] [JSN] | ||
R2-1912520 | Text Proposal for addition of SSR Atmospheric Correction Points Area Definition |
discussion revised to R2-1914073 |
u-blox AG | Rel-16 |
R2-107 AI: 6.8.2.2 |
revised | [WTS] [JSN] | ||
R2-1912521 | MCG RLF reporting via SCell |
discussion revision of R2-1910909 |
Samsung Research America | LTE_NR_DC_CA_enh-Core |
R2-107 AI: 6.10.5 |
withdrawn | [WTS] [JSN] | ||
R2-1912522 | PDCP security issue |
discussion revision of R2-1910910 |
Samsung Research America | TEI16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | ||
R2-1912523 | CR on PDCP security issue |
CR revision of R2-1910963 revised to R2-1914887 |
Samsung Research America | 38.323 15.6.0 CR#321 catF | TEI16 | Rel-15 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1912524 | Fallback procedure for INACTIVE mode |
discussion revision of R2-1910975 revised to R2-1915052 |
Samsung Research America | LTE_NR_DC_CA_enh |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | ||
R2-1912525 | Unnecessary deciphering for duplicated PDUs |
discussion revision of R2-1911022 revised to R2-1915066 |
Samsung Research America | TEI16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | ||
R2-1912526 | CR on unnecessary deciphering for duplicated PDU |
CR revision of R2-1911052 revised to R2-1915067 |
Samsung Research America | 38.323 15.6.0 CR#341 catF | TEI16 | Rel-15 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1912527 | Feedback for EHC algorithm |
discussion revision of R2-1910982 revised to R2-1915075 |
Samsung Research America | NR_IIOT |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912528 | EHC header handling for IIoT |
discussion revision of R2-1911001 |
Samsung Research America | NR_IIOT |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912529 | measurement aspects for CHO |
discussion revised to R2-1916051 |
Samsung R&D Institute UK |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912530 | T312 further enhancement | discussion | Samsung R&D Institute UK |
R2-107 AI: 6.9.3.4 |
not treated | [WTS] [JSN] | |||
R2-1912531 | relaxed RRM support |
discussion revised to R2-1916054 |
Samsung R&D Institute UK |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |||
R2-1912532 | introduction of channel occupancy and RSSI for NR-U CHO | discussion | Samsung R&D Institute UK |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |||
R2-1912533 | considerations for NR ECID |
discussion revised to R2-1916050 |
Samsung R&D Institute UK |
R2-107 AI: 6.8 |
not treated | [WTS] [JSN] | |||
R2-1912534 | Consideration of beam for NR OTDOA |
discussion revised to R2-1916049 |
Samsung R&D Institute UK |
R2-107 AI: 6.8 |
not treated | [WTS] [JSN] | |||
R2-1912535 | EN-DC support in IAB (srb, drb, data flow ) |
discussion revised to R2-1916055 |
Samsung R&D Institute UK |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |||
R2-1912536 | NR DC support (which link is MCG link, SCG link, MN, SN role in DU |
discussion revised to R2-1916056 |
Samsung R&D Institute UK |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |||
R2-1912537 | RLF reporting in dual connection of IAB | discussion | Samsung R&D Institute UK |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |||
R2-1912538 | Running CR for 38.331 on CA/DC Enhancements |
draftCR revised to R2-1914188 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
revised | [WTS] [JSN] | |
R2-1912539 | Running CR for 36.331 for CA/DC Enhancements |
draftCR revised to R2-1914189 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
revised | [WTS] [JSN] | |
R2-1912540 | Running CR for 36.300 on CA/DC Enhancements |
draftCR revised to R2-1914004 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
revised | [WTS] [JSN] | |
R2-1912541 | Running CR for 38.300 for CA/DC Enhancements |
draftCR revised to R2-1914005 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
revised | [WTS] [JSN] | |
R2-1912542 | NR-DC power control |
discussion revised to R2-1915372 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.2 |
not treated | [WTS] [JSN] | |
R2-1912543 | Idle measurement configuration in UE Inactive AS context | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912544 | Handling of early measurement configuration and results | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912545 | Applicability of early measurement solutions for LTE | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912546 | Extended use cases for early measurement other than fast CA/DC setup | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912547 | On further aspects of early measurement | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912548 | Remaining issues for reference time delivery | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | ||
R2-1912549 | On downlink delay compensation | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | ||
R2-1912550 | SPS and UL CG remaining configuration aspects | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1912551 | L2 aspects of SPS and UL CG | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1912552 | Miscellaneous issues with L2 impact | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912553 | Ethernet header compression | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912554 | Handling of de-prioritized MAC PDUs | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | ||
R2-1912555 | Main functions of intra-UE data-data prioritization | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | ||
R2-1912556 | Reliability aspects in LCP restriction enhancement | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | ||
R2-1912557 | Intra-UE Control-Data prioritization - SR over PUSCH | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.3.3 |
not treated | [WTS] [JSN] | ||
R2-1912558 | PDCP Control PDUs and primary path | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | ||
R2-1912559 | Open issues related to MAC CE for PDCP duplication | discussion | Ericsson | NR_IIOT-Core |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | ||
R2-1912560 | Discussion on Potential improvements for delay critical QoS Flows | discussion | Ericsson |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |||
R2-1912561 | draft reply LS on potential improvements for delay critical QoS flows |
LS out LS is reply to SA2 LS To: RAN3 |
Ericsson |
R2-107 AI: 6.19 |
not treated | [WTS] [JSN] | |||
R2-1912562 | Apparent contradiction in Zone Configuration | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1912563 | BSR and SR reporting in Cross RAT V2X operation | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.7 |
not treated | [WTS] [JSN] | |
R2-1912564 | Cross RAT SL Configuration | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.7 |
not treated | [WTS] [JSN] | ||
R2-1912565 | HARQ feedback impact on RAN2 | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | ||
R2-1912566 | PC5-S and Identification on PC5 RRC and RRC Procedures | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | ||
R2-1912567 | RLM Procedure and RLF Recovery handling | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | ||
R2-1912568 | Subtopics to be addressed in Sim M1M2 | discussion | Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | ||
R2-1912569 | Handling UL LBT Failures in NR-U | discussion | PANASONIC R&D Center Germany |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |||
R2-1912570 | Impact of disabling HARQ on DRX |
discussion revision of R2-1909277 revised to R2-1915179 |
PANASONIC R&D Center Germany |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912571 | Management based MDT configuration Handling for RRC Inactive state | discussion | Qualcomm Incorporated | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912572 | Report on email discussion [106#46][IAB]: Low-latency scheduling |
report revision of R2-1910028 |
Samsung Electronics GmbH |
R2-107 AI: 6.1.4.1 |
noted | [WTS] [JSN] | |||
R2-1912573 | Remaining issues with pre-emptive BSR | discussion | Samsung Electronics GmbH |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912574 | Signalling Based MDT Configuration Handling for RRC_INACTIVE | discussion | Qualcomm Incorporated | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912575 | LCID space extension | discussion | Samsung Electronics GmbH |
R2-107 AI: 6.1.4.2 |
noted | [WTS] [JSN] | |||
R2-1912576 | Downlink hop-by-hop flow control | discussion | Samsung Electronics GmbH |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |||
R2-1912577 | On the need for bearer ID in the BAP header | discussion | Samsung Electronics GmbH |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |||
R2-1912578 | Logged MDT Configuration and Reporting for MR-DC | discussion | Qualcomm Incorporated | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912579 | Cross-RAT RLF Report | discussion | Qualcomm Incorporated | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912580 | Discussion on BAP configuration in IAB | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.5.2 |
not treated | [WTS] [JSN] | |||
R2-1912581 | Further consideration on bearer mapping | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.3.2 |
not treated | [WTS] [JSN] | |||
R2-1912582 | Consideration on routing in IAB | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912583 | Discussion on re-routing in IAB network | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912584 | Further consideration on flow control in IAB | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |||
R2-1912585 | Control plane signalling deliver in NSA deployment | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |||
R2-1912586 | Discussion on low latency scheduling in IAB | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912587 | Discussion on low latency scheduling in multi-connectivity scenario | discussion | ZTE Corporation, Sanechips, NEC |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912588 | Consideration on the Extension of LCID and LCG Space in IAB | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912589 | Discussion on IAB BH RLF handling | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |||
R2-1912590 | Discussion on BH RLC channel configuration in IAB network | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.5.2 |
not treated | [WTS] [JSN] | |||
R2-1912591 | Discussion on IAB node connection setup | discussion | ZTE Corporation, Sanechips |
R2-107 AI: 6.1.5.3 |
not treated | [WTS] [JSN] | |||
R2-1912592 | UE History Information | discussion | Qualcomm Incorporated | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1912593 | Discussion about Successful HO in MRO | discussion | Qualcomm Incorporated | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1912594 | Periodical logged measurements and event-triggered logged measurements configuration | discussion | Qualcomm Incorporated | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912595 | Make before break for NTN |
discussion revision of R2-1911274 revised to R2-1914724 |
Ericsson | Rel-16 |
R2-107 AI: 6.6.4.1 |
noted | [WTS] [JSN] | ||
R2-1912596 | [Rapporteur input] RRC parameter list for NR eMIMO | discussion | Samsung | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.1 |
noted | [WTS] [JSN] | |
R2-1912597 | Ephemeris data |
pCR revised to R2-1914195 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
revised | [WTS] [JSN] |
R2-1912598 | Introduction of additional enhancements for NB-IoT in TS 36.331 |
draftCR revision of R2-1911592 revised to R2-1914101 |
Huawei | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R2-1912599 | Introduction of additional enhancements for NB-IoT |
draftCR revision of R2-1911591 revised to R2-1914094 |
Huawei | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R2-1912600 | Introduction of UE specific DRX for NB-IoT | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.11 |
noted | [WTS] [JSN] | |
R2-1912601 | Discussion on DL channel Quality remaining open issues | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.7 |
noted | [WTS] [JSN] | |
R2-1912602 | Discussion on RRM measurements on non-anchor carrier | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.7 |
noted | [WTS] [JSN] | |
R2-1912603 | Discussion on SON ANR remaining open issues | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.6 |
not treated | [WTS] [JSN] | |
R2-1912604 | Discussion on SON RACH and RLF remaining open issues | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.6 |
not treated | [WTS] [JSN] | |
R2-1912605 | Clarification on UP-EDT |
CR revised to R2-1914043 |
Huawei, HiSilicon | 36.331 15.7.0 CR#4104 catF | LTE_eMTC4-Core, NB_IOTenh2-Core | Rel-15 |
R2-107 AI: 4.2 |
revised | [WTS] [JSN] |
R2-1912606 | Discussion on MT-EDT Msg4 based option | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.2 |
noted | [WTS] [JSN] | |
R2-1912607 | [DRAFT] LS on Mobile-terminated Early Data Transmission |
LS out LS To: RAN, SA2, SA3, RAN3, CT1, CT4 |
Huawei | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.2 |
not treated | [WTS] [JSN] | |
R2-1912608 | Discussion on RAN1 agreements on D-PUR | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |
R2-1912609 | FFSes on D-PUR | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |
R2-1912610 | Handling of D-PUR configuration for CP solution |
discussion revision of R2-1910174 revised to R2-1915312 |
Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |
R2-1912611 | [Draft] LS on handling of D-PUR configuration for the CP solution |
LS out LS To: RAN3 revision of R2-1910175 revised to R2-1915313 |
Huawei | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |
R2-1912612 | DRX timers in multiple TBs scheduling of NB-IoT | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.5 |
noted | [WTS] [JSN] | |
R2-1912613 | DRX timers in multiple TBs scheduling of eMTC | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.5 |
withdrawn | [WTS] [JSN] | |
R2-1912614 | Remaining issues to support user plane optimisations for eMTC and NB-IoT connected to 5GC | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.12.1 |
noted | [WTS] [JSN] | |
R2-1912615 | Support of RRC connection Re-establishment for the Control plane for NB-IoT connected to 5GC | discussion | Huawei, HiSilicon | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.10.2 |
not treated | [WTS] [JSN] | |
R2-1912616 | Access Stratum Release Assistance Indicator for eMTC and NB-IoT connected to 5GC | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
not treated | [WTS] [JSN] | |
R2-1912617 | Discussion on support of RRC_INACTIVE for eMTC connected to 5GC | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.12.2 |
not treated | [WTS] [JSN] | |
R2-1912618 | Unified access control for NB-IoT and eMTC connected to 5GC | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
noted | [WTS] [JSN] | |
R2-1912619 | PDCP for NB-IoT and eMTC connected to 5GC | discussion | Huawei, HiSilicon | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
noted | [WTS] [JSN] | |
R2-1912620 | Remaining issues for mode1 and 2 operation | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912621 | NR UL SL prioritization aspects | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912622 | On admission/congestion control | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.4 |
not treated | [WTS] [JSN] | |
R2-1912623 | Remaining aspects on groupcast operation | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912624 | Cross-RAT scheduling for NR V2X SL | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.7 |
not treated | [WTS] [JSN] | |
R2-1912625 | Detecting and Handling of UL LBT failures | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912626 | Further consideration on configured UL grant enhancement | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.5 |
noted | [WTS] [JSN] | |
R2-1912627 | Channel Access Priority selection & multiplexing for Configured Grant | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.6 |
not treated | [WTS] [JSN] | |
R2-1912628 | Sidelink and Uplink Prioritization |
discussion revision of R2-1911105 |
Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912629 | Congestion control in NR-V2X |
discussion revision of R2-1911120 |
Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912630 | Discussion on V2X specific validity area |
discussion revision of R2-1911102 revised to R2-1915940 |
Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.4 |
not treated | [WTS] [JSN] | |
R2-1912631 | Discussion on Default SLRB and HARQ configuration |
discussion revision of R2-1911122 |
Samsung | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1912632 | Open issues from email discussion [107#30][NR/LTE/Mob-enh] | discussion | Ericsson | NR_Mob_enh-Core |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | ||
R2-1912633 | Handling of a HO command while UE is monitoring CHO | discussion | Ericsson | NR_Mob_enh-Core |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | ||
R2-1912634 | Suspend while monitoring CHO in NR | discussion | Ericsson | NR_Mob_enh-Core |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | ||
R2-1912635 | Conditional PSCell addition/change | discussion | Ericsson | NR_Mob_enh-Core |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | ||
R2-1912636 | TP for 38.331 on CHO | discussion | Ericsson | NR_Mob_enh-Core |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | ||
R2-1912637 | Further details on CHO failure handling | discussion | Ericsson | NR_Mob_enh-Core |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | ||
R2-1912638 | Discussion on incoming LS for QoE measurement collection in LTE | discussion | Ericsson | TEI16 |
R2-107 AI: 7.5 |
not treated | [WTS] [JSN] | ||
R2-1912639 | Corrections of QoE measurement collection | CR | Ericsson | 36.331 15.7.0 CR#4105 catC | TEI16 | Rel-15 |
R2-107 AI: 7.5 |
not treated | [WTS] [JSN] |
R2-1912640 | Draft reply LS on QoE Measurement Collection |
LS out LS is reply to R2-1912061 source LS: S5-195659 LS To: SA5 |
Ericsson |
R2-107 AI: 7.5 |
not treated | [WTS] [JSN] | |||
R2-1912641 | Outstanding issues for SRVCC from 5G to 3G | discussion | Ericsson | SRVCC_NR_to_UMTS-Core |
R2-107 AI: 6.14.2 |
noted | [WTS] [JSN] | ||
R2-1912642 | Measurements for SRVCC from 5G to 3G | discussion | Ericsson | SRVCC_NR_to_UMTS-Core |
R2-107 AI: 6.14.3 |
not treated | [WTS] [JSN] | ||
R2-1912643 | Running CR for introduction of SRVCC from 5G to 3G | draftCR | Ericsson | SRVCC_NR_to_UMTS-Core | Rel-15 |
R2-107 AI: 6.14.1 |
endorsed | [WTS] [JSN] | |
R2-1912644 | Extended PO and early termination for page monitoring |
discussion revised to R2-1913967 |
Ericsson | NR_unlic-Core |
R2-107 AI: 6.2.3.1 |
revised | [WTS] [JSN] | ||
R2-1912645 | Cell (re)selection for NR-U |
discussion revised to R2-1913968 |
Ericsson | NR_unlic-Core |
R2-107 AI: 6.2.3.2 |
revised | [WTS] [JSN] | ||
R2-1912646 | RRM in NR-U | discussion | Ericsson | NR_unlic-Core |
R2-107 AI: 6.2.3.3 |
noted | [WTS] [JSN] | ||
R2-1912647 | SLRB configuration for NR V2X UE |
discussion revision of R2-1910292 revised to R2-1915134 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | ||
R2-1912648 | Discussion on QoS management for NR V2X |
discussion revision of R2-1910289 revised to R2-1915135 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | ||
R2-1912649 | RRM Measurements for Mobility in NR-U |
discussion revision of R2-1910540 revised to R2-1914657 |
Fraunhofer HHI, Fraunhofer IIS |
R2-107 AI: 6.2.3.3 |
not treated | [WTS] [JSN] | |||
R2-1912650 | Resource Pool Sharing between Mode 1 and Mode 2 UEs |
discussion revision of R2-1910534 revised to R2-1915552 |
Fraunhofer HHI, Fraunhofer IIS |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |||
R2-1912651 | Resource Allocation for Mode 2 NR V2X |
discussion revision of R2-1910536 revised to R2-1915555 |
Fraunhofer HHI, Fraunhofer IIS |
R2-107 AI: 6.4.4 |
not treated | [WTS] [JSN] | |||
R2-1912652 | Resource Allocation Procedures for NR V2X |
discussion revision of R2-1910537 revised to R2-1915554 |
Fraunhofer HHI, Fraunhofer IIS |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |||
R2-1912653 | Inclusion of 90MHz UE Bandwidth |
CR revised to R2-1914203 |
Vodafone | 38.306 15.7.0 CR#171 catC | NR_newRAT-Core, TEI16 | Rel-16 |
R2-107 AI: 6.20.3 |
revised | [WTS] [JSN] |
R2-1912654 | On Analysis of RACH Capacity in NTN |
discussion revision of R2-1908856 |
Mediatek India Technology Pvt. |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912655 | Improving Cell Reselection using Next Cell Information in NTN |
discussion revision of R2-1908857 revised to R2-1914586 |
Mediatek India Technology Pvt. |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912656 | Network and cell (re)selection in SNPN access mode |
discussion revised to R2-1915384 |
Nokia, Nokia Shanghai Bell | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912657 | RRC considerations to support SNPNs |
discussion revised to R2-1915385 |
Nokia, Nokia Shanghai Bell | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.3 |
not treated | [WTS] [JSN] | |
R2-1912658 | Discussion on PLMN and Cell selection and reselection enhancements for NR-U | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |
R2-1912659 | RLM/RLF measurement on NR-U |
discussion revision of R2-1909317 revised to R2-1915390 |
Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.4 |
not treated | [WTS] [JSN] | |
R2-1912660 | On UL transmissions during SMTC in NR-U |
discussion revision of R2-1909318 |
Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.3 |
noted | [WTS] [JSN] | |
R2-1912661 | Handling of pending TB for CG transmission | discussion | Lenovo, Motorola Mobility | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.5 |
not treated | [WTS] [JSN] | |
R2-1912662 | LBT impact to Multi-TTI scheduling |
discussion revised to R2-1915103 |
Lenovo, Motorola Mobility | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | |
R2-1912663 | Impact of LBT on power headroom reporting functionality |
discussion revision of R2-1910090 |
Lenovo, Motorola Mobility | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.7 |
noted | [WTS] [JSN] | |
R2-1912664 | Report of [107#60] [NR/NTN] RACH capacity evaluation and procedures (ZTE) | discussion | ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
noted | [WTS] [JSN] | |
R2-1912665 | TP on RACH capacity evaluation and procedures |
discussion revised to R2-1914069 |
ZTE Corporation, Sanechips,China Southern Power Grid Co., Ltd | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1912666 | Consideration on the limited C-RNTI size in NTN |
discussion revision of R2-1909258 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.2 |
not treated | [WTS] [JSN] | |
R2-1912667 | [DRAFT] LS on handling the limited size of C-RNTI in NTN (FS_NR_NTN_solutions) |
LS out LS To: RAN1 revision of R2-1909259 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.2 |
not treated | [WTS] [JSN] | |
R2-1912668 | Location report in NTN |
discussion revision of R2-1909266 revised to R2-1915083 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1912669 | Consideration on measurements in NTN-TN service continuity |
discussion revision of R2-1909260 revised to R2-1915082 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1912670 | Further consideration on tracking area management in NTN |
discussion revision of R2-1909263 |
ZTE Corporation, Sanechips | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
noted | [WTS] [JSN] | |
R2-1912671 | Clarification on the RRCReconfiguration for unauthenticated emergency call | CR | ZTE Corporation, Sanechips | 38.331 15.7.0 CR#1271 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
not pursued | [WTS] [JSN] |
R2-1912672 | Consideration on UE radio capability ID signaling in inter-node RRC messages |
discussion revised to R2-1915079 |
ZTE Corporation, Sanechips | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
not treated | [WTS] [JSN] | |
R2-1912673 | Introduction of UE radio capability ID in inter-node RRC messages |
draftCR revised to R2-1915080 |
ZTE Corporation, Sanechips | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
noted | [WTS] [JSN] | |
R2-1912674 | Introduction of efficient transition out of RRC_CONNECTED by UE assistance in TS38.331 | draftCR | ZTE Corporation, Sanechips,China Southern Power Grid Co., Ltd | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.3 |
not treated | [WTS] [JSN] | |
R2-1912675 | Further consideration on the System Information of the Private Network | discussion | ZTE Corporation, Sanechips | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912676 | Considerations on the remaining Idle/Inactive state issues of the Private Network | discussion | ZTE Corporation, Sanechips | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912677 | The issue of putting all SIBs in one SI message |
discussion revision of R2-1909236 |
PANASONIC R&D Center Germany, MediaTek Inc., vivo, Charter Communications, OPPO |
R2-107 AI: 6.2.3.5 |
noted | [WTS] [JSN] | |||
R2-1912678 | Open issues for msgB formats for 2-step RA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |
R2-1912679 | RNTI design and HARQ aspects for 2-step RA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1912680 | Configuration of 2-step RA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.4 |
not treated | [WTS] [JSN] | |
R2-1912681 | 2-step CFRA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |
R2-1912682 | PUSCH selection and MsgA payloads in 2-step RA | discussion | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |
R2-1912683 | 2-step RA 38.331 Draft CR | draftCR | Ericsson | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.4 |
not treated | [WTS] [JSN] | |
R2-1912684 | Impact of systematic LBT failure on UL transmission procedure |
discussion revision of R2-1910099 |
Lenovo, Motorola Mobility | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912685 | Further details of the RACH procedure for NR-U |
discussion revision of R2-1910098 |
Lenovo, Motorola Mobility | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |
R2-1912686 | SL HARQ protocol operation |
discussion revised to R2-1915106 |
Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912687 | SR trigger for NR SL |
discussion revised to R2-1915107 |
Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1912688 | SL LCP procedure considering the MCR requirements |
discussion revision of R2-1910088 |
Lenovo, Motorola Mobility | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1912689 | CSI/SRS reporting for WUS | discussion | Lenovo, Motorola Mobilty | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.2 |
noted | [WTS] [JSN] | |
R2-1912690 | SCell Beam Failure Recovery Procedure | discussion | Lenovo, Motorola Mobility | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1912691 | Considerations on the RRM measurement relaxation |
discussion revised to R2-1915539 |
PANASONIC R&D Center Germany |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |||
R2-1912692 | Loading Control in the RACH Type Selection |
discussion revision of R2-1909238 revised to R2-1915450 |
PANASONIC R&D Center Germany |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |||
R2-1912693 | Discussion on the leaving conditions for CHO |
discussion revision of R2-1909255 revised to R2-1915541 |
PANASONIC R&D Center Germany |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912694 | SI update notification and PWS notification in WUS |
discussion revision of R2-1909237 revised to R2-1915540 |
PANASONIC R&D Center Germany |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |||
R2-1912695 | DRX HARQ RTT enhancements for NTN |
pCR revised to R2-1914056 |
Nomor Research GmbH | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
revised | [WTS] [JSN] |
R2-1912696 | Multiple PLMN Identities in NTN |
discussion revision of R2-1908988 |
Nomor Research GmbH | Rel-16 |
R2-107 AI: 6.6.4.3 |
not treated | [WTS] [JSN] | ||
R2-1912697 | System Information in NTN |
discussion revision of R2-1908989 revised to R2-1915543 |
Nomor Research GmbH | Rel-16 |
R2-107 AI: 6.6.4.3 |
not treated | [WTS] [JSN] | ||
R2-1912698 | HARQ process selection and logical channel prioritization | discussion | Nomor Research GmbH | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | ||
R2-1912699 | MAC CE signaling impact of enhanced TCI indication framework |
discussion revision of R2-1910144 |
Ericsson |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | |||
R2-1912700 | Report of email discussion [107#39] [NR - eMIMO] | discussion | Ericsson |
R2-107 AI: 6.16.3 |
not treated | [WTS] [JSN] | |||
R2-1912701 | Report of email discussion [107#63][NR/NTN] |
pCR revised to R2-1914196 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
revised | [WTS] [JSN] |
R2-1912702 | Congestion Control in NR V2X | discussion | Fraunhofer IIS, Fraunhofer HHI |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1912703 | Running stage 2 CR on NR positioning 107#69 | draftCR | Intel Corporation, ESA | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.1 |
not treated | [WTS] [JSN] | |
R2-1912704 | Support of NR dependent positioning methods | discussion | Intel Corporation | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | |
R2-1912705 | Assistance data for UE based DL only positioning |
discussion revision of R2-1909407 revised to R2-1914730 |
Intel Corporation | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.2.4 |
not treated | [WTS] [JSN] | |
R2-1912706 | Initial Access and Network Setup for IAB | discussion | Intel | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |
R2-1912707 | Multi-route support in IAB | discussion | Intel | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |
R2-1912708 | Flow control in IAB - remaining issues | discussion | Intel | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |
R2-1912709 | Uplink latency reduction | discussion | Intel | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1912710 | Further discussion on Backhaul RLF handling | discussion | Intel | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |
R2-1912711 | Handling of Fairness in IAB | discussion | Intel | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.4 |
not treated | [WTS] [JSN] | |
R2-1912712 | Conditional Handover for Non-Terrestrial Networks | discussion | Intel | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1912713 | Access Control for SNPN and CAG | discussion | Intel Corporation | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912714 | Suitability criteria for NPN | discussion | Intel Corporation | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912715 | Support of multiple SPS and CG configurations | discussion | Intel | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912716 | TSC assistance information | discussion | Intel | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.3 |
not treated | [WTS] [JSN] | |
R2-1912717 | Details for Ethernet header compression solution | discussion | Intel | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |
R2-1912718 | Intra UE prioritization of UL Data and Data | discussion | Intel | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1912719 | PDCP duplication with multiple RLC entities | discussion | Intel | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1912720 | UE based PDCP duplication activation/deactivation |
discussion revision of R2-1910453 revised to R2-1914743 |
Intel | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.2 |
not treated | [WTS] [JSN] | |
R2-1912721 | Full configuration indication to SN - Feedback on RAN3 LS | discussion | Intel | TEI16, NR_newRAT-Core | Rel-16 |
R2-107 AI: 6.19 |
not treated | [WTS] [JSN] | |
R2-1912722 | False base station detection – feedback on SA3 LS | discussion | Intel | FS_5GFBS | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1912723 | Updates to reestablishment procedure |
CR revision of R2-1911276 revised to R2-1914788 |
ZTE Corporation, Sanechips, Intel Corporation | 38.331 15.7.0 CR#11432 catC | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912724 | Scheduling enhancements for TSC network | discussion | OPPO | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1912725 | Discussion on confirmation MAC CE for TSC network | discussion | OPPO | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1912726 | Email discussion summary of [107#55][IIOT] CG/SPS for TSC |
discussion revised to R2-1913952 |
OPPO | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
revised | [WTS] [JSN] | ||
R2-1912727 | Discussion on Ethernet Header Compression | discussion | OPPO | Rel-16 |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912728 | Other issue on intra-UE prioritization in IIoT | discussion | OPPO | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | ||
R2-1912729 | Intra-UE prioritization involving configured grant | discussion | OPPO | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | ||
R2-1912730 | Discussion on SR cancelling on intra-UE prioritization involving SR | discussion | OPPO | Rel-16 |
R2-107 AI: 6.7.3.3 |
not treated | [WTS] [JSN] | ||
R2-1912731 | Intra-UE prioritization between multiple SRs | discussion | OPPO, Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.7.3.4 |
not treated | [WTS] [JSN] | ||
R2-1912732 | Draft LS on intra-UE prioritization for multiple SRs |
LS out LS To: RAN1 |
OPPO | FS_NR_IIOT | Rel-16 |
R2-107 AI: 6.7.3.4 |
not treated | [WTS] [JSN] | |
R2-1912733 | Discussion on data duplication enhancement in IIoT | discussion | OPPO | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | ||
R2-1912734 | Discussion on UE-based data duplication enhancement | discussion | OPPO | Rel-16 |
R2-107 AI: 6.7.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912735 | Discussion on potential improvements for delay critical QoS Flows | discussion | OPPO | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | ||
R2-1912736 | On Maximum Number of CHO Candidate Cells and Nodes | discussion | Charter Communications, Inc | NR_Mob_enh, LTE_feMob, NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1912737 | Addition of broadcast of barometric pressure assistance data |
CR revision of R2-1908847 revised to R2-2000188 |
Polaris Wireless, FirstNet, Intel, AT&T, NextNav | 36.331 15.7.0 CR#40261 catC | LCS_LTE_acc_enh-Core, TEI16 | Rel-16 |
R2-107 AI: 7.6 |
not treated | [WTS] [JSN] |
R2-1912738 | Addition of broadcast of barometric pressure assistance data |
CR revision of R2-1908848 |
Polaris Wireless, FirstNet, Intel, AT&T, NextNav | 36.355 15.5.0 CR#2421 catC | LCS_LTE_acc_enh-Core, TEI16 | Rel-16 |
R2-107 AI: 7.6 |
not treated | [WTS] [JSN] |
R2-1912739 | Discussion on configuration aspect for CHO |
discussion revised to R2-1915844 |
Huawei, HiSilicon, China Telecom | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1912740 | Discussion on execution aspect for CHO |
discussion revised to R2-1915845 |
Huawei, HiSilicon | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1912741 | Discussion on failure handling for CHO | discussion | Huawei, HiSilicon | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |
R2-1912742 | Discussion on UE capabilities for mobility enhancements | discussion | Huawei, HiSilicon | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1912743 | Discussion on combination of simultaneous connectivity and CHO |
discussion revised to R2-1915846 |
Huawei, HiSilicon | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1912744 | Discussion on fast handover failure recovery | discussion | Huawei, HiSilicon | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.4 |
not treated | [WTS] [JSN] | |
R2-1912745 | Discussion on CHO for Pscell change | discussion | Huawei, HiSilicon | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1912746 | Reprot of email discussion 107-47 | discussion | Huawei | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.1 |
noted | [WTS] [JSN] | |
R2-1912747 | Running 38.331 CR for introducing logged MDT | draftCR | Huawei | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.1 |
merged | [WTS] [JSN] | |
R2-1912748 | Discussion on user consent for MDT |
discussion revision of R2-1909711 |
Huawei, HiSilicon, LG Uplus | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912749 | Discussion on remaining aspects on logged MDT and Accessibility measurements | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1912750 | Discussion on remaining aspects on immediate MDT | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1912751 | Discussion on UE impacts and UE capabilities due to MDT | discussion | Huawei, HiSilicon, LG Uplus | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912752 | Discussion on L2 measurements based on SA5 TS 28.552 |
discussion revision of R2-1909723 |
Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | |
R2-1912753 | Draft LS on L2 measurements in TS 28.552 |
LS out LS To: SA5, RAN3 |
Huawei | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | |
R2-1912754 | Discussion on new L2 measurements | discussion | Huawei, HiSilicon, LG Uplus | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
noted | [WTS] [JSN] | |
R2-1912755 | Discussion on delay measurement and collection | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | |
R2-1912756 | Discussion on RLF report and RACH report for SON | discussion | Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1912757 | Discussion on mobility history information |
discussion revision of R2-1909741 |
Huawei, HiSilicon | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.5 |
not treated | [WTS] [JSN] | |
R2-1912758 | Correction to the handling of stored AS context upon CN type change |
CR revised to R2-1913986 |
Huawei, HiSilicon | 36.304 15.4.0 CR#772 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-107 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1912759 | Discussion on paging issue for LTE-5GC | discussion | Huawei, HiSilicon | LTE_5GCN_connect-Core, TEI16 | Rel-15 |
R2-107 AI: 7.6 |
not treated | [WTS] [JSN] | |
R2-1912760 | Correction on paging for LTE-5GC | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4106 catB | LTE_5GCN_connect-Core, TEI16 | Rel-15 |
R2-107 AI: 7.6 |
postponed | [WTS] [JSN] |
R2-1912761 | Discussion on UE behaviours on location info for logged MDT | discussion | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
noted | [WTS] [JSN] | |
R2-1912762 | Correction on location info collection for logged MDT | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4107 catF | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
not pursued | [WTS] [JSN] |
R2-1912763 | Discussion on potential impacts due to management of QMC |
discussion revised to R2-1915840 |
Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 7.5 |
not treated | [WTS] [JSN] | |
R2-1912764 | Draft reply LS on QoE Measurement Collection |
LS out LS To: SA5 |
Huawei | TEI16 | Rel-16 |
R2-107 AI: 7.5 |
not treated | [WTS] [JSN] | |
R2-1912765 | Measurement coordination on maxMeasIdentitiesSCG in MR-DC |
discussion revised to R2-1914905 |
ZTE Corporation, Sanechips, Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.3 |
not treated | [WTS] [JSN] | |
R2-1912766 | Corrections on maxMeasIdentitiesSCG-NR in MR-DC |
CR revised to R2-1914906 |
ZTE Corporation, Sanechips, Ericsson | 38.331 15.7.0 CR#1272 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.3 |
not treated | [WTS] [JSN] |
R2-1912767 | CR to introduce timer for DRX based SFTD measurement |
CR revised to R2-1914907 |
ZTE Corporation, Sanechips, MediaTek Inc. | 38.331 15.7.0 CR#1273 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R2-1912768 | Correction on absence of gapPurpose |
CR revised to R2-1914908 |
ZTE Corporation, Sanechips | 38.331 15.7.0 CR#1274 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
agreed | [WTS] [JSN] |
R2-1912769 | Consideration on DRX coordination in ANR |
discussion revised to R2-1914909 |
ZTE Corporation, Sanechips, NEC | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1912770 | Corrections on DRX coordination in ANR |
CR revised to R2-1914910 |
ZTE Corporation, Sanechips, NEC | 38.331 15.7.0 CR#1275 catF | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912771 | Report of [107#28][NR R15] Ambiguity of UE FDD&TDD FR1&FR2 RAN2 capability | discussion | ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
noted | [WTS] [JSN] | |
R2-1912772 | Correction on ambiguity of UE FDD/TDD FR1/FR2 capabilities |
CR revised to R2-1914180 |
ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | 38.306 15.7.0 CR#172 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1912773 | Remaining issues on UTRAN measurement | discussion | ZTE Corporation, Sanechips | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-107 AI: 6.14.2 |
not treated | [WTS] [JSN] | |
R2-1912774 | Corrections on UTRAN measurement | draftCR | ZTE Corporation, Sanechips | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-107 AI: 6.14.2 |
noted | [WTS] [JSN] | |
R2-1912775 | Remaining issues on CLI measurement | discussion | ZTE Corporation, Sanechips | NR_CLI_RIM-Core | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] | |
R2-1912776 | Control plane consideration for dual active protocol stack (DAPS) based RUDI HO |
discussion revision of R2-1910383 revised to R2-1914836 |
Intel Corporation, Qualcomm Inc, Charter Communications,Mediatek Inc, Apple | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912777 | Control plane signaling flow for DAPS based RUDI HO |
discussion revision of R2-1909572 |
Intel Corporation | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912778 | Stage 2 TP for DAPS based RUDI | draftCR | Intel Corporation | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.1 |
not treated | [WTS] [JSN] | |
R2-1912779 | Report of [107#30][NR/LTE/Mob-enh] Configuration of CHO and execution condition | discussion | Intel Corporation | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
noted | [WTS] [JSN] | |
R2-1912780 | TS38.331 TP of 107#30 | draftCR | Intel Corporation | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1912781 | Running CR for the introduction of NR mobility enhancement |
CR revised to R2-1913995 |
Intel Corporation | 38.3 15.7.0 CR#172 catB | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.1 |
revised | [WTS] [JSN] |
R2-1912782 | Capability design for DAPS based RUDI HO | discussion | Intel Corporation | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912783 | DL data forwarding in DAPS based RUDI HO | discussion | Intel Corporation | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1912784 | Confirmation of WA for failure handling | discussion | Intel Corporation, InterDigital Inc., China Telecom, OPPO, MediaTek, Lenovo, Motorola Mobility, vivo, Spreadtrum, ITRI, Sharp, Panasonic, Xiaomi, ZTE Corporation, Sanechips, LG Electronics, CATT, NEC, Ericsson, Google Inc., Apple | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.2 |
noted | [WTS] [JSN] | |
R2-1912785 | RAN2 details of the wake-up signal | discussion | Intel Corporation | NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.2 |
noted | [WTS] [JSN] | |
R2-1912786 | Efficient RRC state transition out of RRC_CONNECTED | discussion | Intel Corporation | NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.3 |
not treated | [WTS] [JSN] | |
R2-1912787 | Configuration of MIMO layers per DL BWP | discussion | Intel Corporation | NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.4 |
not treated | [WTS] [JSN] | |
R2-1912788 | UE assistance for C-DRX configuration | discussion | Intel Corporation | NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.5 |
noted | [WTS] [JSN] | |
R2-1912789 | Relaxation of RRM measurements | discussion | Intel Corporation | NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1912790 | Remaining aspects on SL PDCP |
discussion revised to R2-1915728 |
Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912791 | On the support of simultaneous configuration of mode1 and mode2 |
discussion revised to R2-1915727 |
Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |
R2-1912792 | Need for SL RLC re-establishment | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912793 | PC5 RRC procedure details for NR V2X | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912794 | Further consideration on the SucessRAR design and Fallback RAR | discussion | Intel Corporation | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1912795 | Preamble grouping selection or PUSCH TBS size selection for 2-step RACH | discussion | Intel Corporation | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1912796 | Support of CFRA in 2-step RACH | discussion | Intel Corporation | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |
R2-1912797 | IAB workplan update |
Work Plan revision of R2-1909641 revised to R2-1914806 |
Qualcomm Incorporated (Rapporteur) | Rel-16 |
R2-107 AI: 6.1.1 |
noted | [WTS] [JSN] | ||
R2-1912798 | IAB (TP to CR on 38300) L2 structures | discussion | Qualcomm Incorporated | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | ||
R2-1912799 | SA IAB operation with EN-DC UEs | discussion | Qualcomm Incorporated | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | ||
R2-1912800 | IAB extension of LCID space | discussion | Qualcomm Incorporated | Rel-16 |
R2-107 AI: 6.1.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912801 | IAB extension of LCG space | discussion | Qualcomm Incorporated | Rel-16 |
R2-107 AI: 6.1.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912802 | IAB load reporting to IAB-donor CU-CP |
discussion revision of R2-1909647 |
Qualcomm Incorporated | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | ||
R2-1912803 | Issue on ping pong state transition for sidelink UE | discussion | Beijing Xiaomi Software Tech |
R2-107 AI: 4.3 |
withdrawn | [WTS] [JSN] | |||
R2-1912804 | Discussion on resource allocation | discussion | Beijing Xiaomi Software Tech |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912805 | Discussion on sidelink admission control | discussion | Beijing Xiaomi Software Tech |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |||
R2-1912806 | Discussion on BSR prioritization | discussion | Beijing Xiaomi Software Tech |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |||
R2-1912807 | Introduction of RACS [36.300] | draftCR | MediaTek Inc. | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.1 |
endorsed | [WTS] [JSN] | |
R2-1912808 | Introduction of RACS [38.300] | draftCR | MediaTek Inc. | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.1 |
endorsed | [WTS] [JSN] | |
R2-1912809 | Decision on support of delta signalling | discussion | MediaTek Inc. | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
noted | [WTS] [JSN] | |
R2-1912810 | Introduction of UECapabilityInformation segmentation in 36.331 |
draftCR revised to R2-1914018 |
MediaTek Inc., CATT, Ericsson, Spreadtrum Communications, ZTE Corporation, Sanechips, OPPO, Qualcomm Incorporated | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.3 |
revised | [WTS] [JSN] | |
R2-1912811 | Work plan for RACS-RAN work item | discussion | MediaTek Inc., CATT | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.1 |
noted | [WTS] [JSN] | |
R2-1912812 | Access handling for multiple candidate cells in CHO |
discussion revised to R2-1914984 |
Futurewei Technologies | Rel-16 |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | ||
R2-1912813 | Support (or not) of PC5-RRC for groupcast |
discussion revised to R2-1915791 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912814 | Contents and handling of PC5-RRC configuration | discussion | MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912815 | Single vs. multiple PC5-RRC connection | discussion | MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912816 | Procedure and configurations for conditional SN change |
discussion revised to R2-1914985 |
Futurewei Technologies | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | ||
R2-1912817 | RLM with aperiodic reference signals | discussion | MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912818 | Discussion on RLM & RLF reduction for conditional PSCell addition/change | discussion | Futurewei Technologies |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |||
R2-1912819 | RLM and state modelling based on PC5-S connection | discussion | MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912820 | Validity areas based on cell lists |
discussion revised to R2-1915799 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912821 | Email discussion report for [107#79] [LTE/feMOB] Capability coordination for RUDI HO | discussion | Qualcomm India Pvt Ltd | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
noted | [WTS] [JSN] | |
R2-1912822 | UE capability sharing aspects for DAPS based enhanced MBB HO |
discussion revision of R2-1909875 |
Qualcomm Inc, Charter communications, Intel Corp, Appl Inc, Google Inc | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912823 | Report on [107#48][NR/MDT] Running 38.331 CR for introducing Immediate MDT and other MDT functions | discussion | Ericsson | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.1 |
noted | [WTS] [JSN] | |
R2-1912824 | Running 38.331 CR for introducing Immediate MDT and other MDT functions | CR | Ericsson | 38.331 15.7.0 CR#1276 catB | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.1 |
merged | [WTS] [JSN] |
R2-1912825 | Mobility history information reporting from the UE | discussion | Ericsson | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912826 | Logged MDT Configuration & Reporting handling in DC scenarios | discussion | Ericsson | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912827 | Leftover issues for Logged MDT | discussion | Ericsson | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
noted | [WTS] [JSN] | |
R2-1912828 | CR on introducing UE capability for MDT in NR | CR | Ericsson | 38.306 15.7.0 CR#173 catB | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] |
R2-1912829 | UE Location Report capability indication for MDT | discussion | Ericsson | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912830 | Area Scope in MDT configuration | discussion | Ericsson | NR_SON_MDT | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912831 | Remaining issues for RRC Segmentation | discussion | Ericsson | RACS-RAN | Rel-16 |
R2-107 AI: 6.5.3 |
noted | [WTS] [JSN] | |
R2-1912832 | Remaining aspects on Capability ID | discussion | Ericsson | RACS-RAN | Rel-16 |
R2-107 AI: 6.5.2 |
noted | [WTS] [JSN] | |
R2-1912833 | Introduction of RRC Segmentation - Downlink | CR | Ericsson | 36.331 15.7.0 CR#4108 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912834 | Introduction of RRC Segmentation - Downlink | CR | Ericsson | 36.306 15.6.0 CR#1717 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912835 | Segmentation in DL | discussion | Ericsson, DT, AT&T, Vodafone | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1912836 | Introduction of RRC Segmentation - Downlink | CR | Ericsson, DT, AT&T, Vodafone | 38.331 15.7.0 CR#1277 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912837 | Introduction of RRC Segmentation - Downlink | CR | Ericsson | 38.306 15.7.0 CR#174 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912838 | UL TDM aspects of enhanced MBB HO using Dual Active Protocol Stack |
discussion revision of R2-1909848 |
Qualcomm Inc, Charter communications, Intel Corp, MediaTek Inc, Apple Inc, Google Inc | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
noted | [WTS] [JSN] | |
R2-1912839 | [Draft] LS for DAPS Handover UE capabilities |
LS out LS To: RAN1, RAN4 |
Qualcomm India Pvt Ltd | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912840 | Split Threshold for DC and NR-U |
discussion revision of R2-1906041 |
Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | |
R2-1912841 | NPN Work Plan |
discussion revision of R2-1909112 revised to R2-1914598 |
Nokia, China Telecom (Rapporteurs) | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.1 |
noted | [WTS] [JSN] | |
R2-1912842 | NPN Stage 2 Draft CR |
draftCR revision of R2-1909113 |
Nokia, China Telecom (Rapporteurs) | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.1 |
not treated | [WTS] [JSN] | |
R2-1912843 | Report of Email Discussion [107#41] on CSG Aspects | report | Nokia (Rapporteur) | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
noted | [WTS] [JSN] | |
R2-1912844 | PDCP Reordering Problems | discussion | Nokia, Nokia Shanghai Bell, NTT DOCOMO INC. | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
noted | [WTS] [JSN] | |
R2-1912845 | Fixed LCP Restrictions |
discussion revision of R2-1802503 |
Nokia, Ericsson, Fujitsu, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
noted | [WTS] [JSN] | |
R2-1912846 | QoS Flow Handling |
discussion revision of R2-1909119 revised to R2-1914602 |
Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1912847 | MDBV Enforcement |
discussion revised to R2-1914603 |
Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1912848 | [Draft] LS on uplink TDM pattern for LTE DAPS based enhanced make-before-break HO |
LS out LS To: RAN1 |
Qualcomm India Pvt Ltd | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
not treated | [WTS] [JSN] | |
R2-1912849 | Access Stratum Release Assistance Indicator for eMTC and NB-IoT connected to 5GC | discussion | Qualcomm India Pvt Ltd | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
noted | [WTS] [JSN] | |
R2-1912850 | Access stratum changes to support short eDRX for eMTC connected 5GC in RRC_INACTIVE state |
discussion revision of R2-1910468 revised to R2-1914803 |
Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.12.2 |
not treated | [WTS] [JSN] | |
R2-1912851 | Idle Mode cell reselection based on CN type supported |
discussion revision of R2-1910469 revised to R2-1914789 |
Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
not treated | [WTS] [JSN] | |
R2-1912852 | PDCP type to be used for NB-IoT and eMTC connected to 5GC |
discussion revision of R2-1910473 |
Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
not treated | [WTS] [JSN] | |
R2-1912853 | UAC information change indication in 5GC |
discussion revision of R2-1910467 revised to R2-1914801 |
Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
not treated | [WTS] [JSN] | |
R2-1912854 | UE identity for CIoT/5GC UP Optimization and RRC indication to upper layers |
discussion revised to R2-1914802 |
Qualcomm India Pvt Ltd | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.12.1 |
not treated | [WTS] [JSN] | |
R2-1912855 | Unified access control for NB-IoT connected to 5GC | discussion | Qualcomm India Pvt Ltd | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
not treated | [WTS] [JSN] | |
R2-1912856 | Remaining issues in MT EDT for UP solution | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.2 |
not treated | [WTS] [JSN] | |
R2-1912857 | Remaining issues in Msg4-based Control Plane solution for MT EDT | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.2 |
not treated | [WTS] [JSN] | |
R2-1912858 | After the acquisition of ETWS/CMAS by non-BL UEs in connected mode | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.8 |
not treated | [WTS] [JSN] | |
R2-1912859 | Remaning issues in DL Quality report | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.6 |
not treated | [WTS] [JSN] | |
R2-1912860 | Remaning issues on the support of 5GCN connectivity | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
not treated | [WTS] [JSN] | |
R2-1912861 | Remaining issues in RRC inactive state | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.12.2 |
not treated | [WTS] [JSN] | |
R2-1912862 | Additional issues in D-PUR in RRC_IDLE | discussion | Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |
R2-1912863 | Non-BL UE operation in standalone deployment |
discussion revision of R2-1909551 revised to R2-1914859 |
Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.9 |
not treated | [WTS] [JSN] | |
R2-1912864 | Introduction of Rel-16 eMTC enhancements |
CR revised to R2-1914036, R2-1914860 |
Intel Corporation | 36.3 15.7.0 CR#1251 catB | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
revised | [WTS] [JSN] |
R2-1912865 | Remaining FFSs on enabling the UE to camp on non-best cell | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |
R2-1912866 | Remaining issues related to random access procedure | discussion | Intel Corporation | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |
R2-1912867 | Non-BL UE in normal and enhanced coverage |
discussion revised to R2-1914861 |
Intel Corporation | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.8 |
not treated | [WTS] [JSN] | |
R2-1912868 | Considerations for Geographical Zone Design for NR V2X |
discussion revision of R2-1909585 revised to R2-1914865 |
InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.4 |
not treated | [WTS] [JSN] | |
R2-1912869 | RAN2 Aspects of HARQ for NR V2X | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912870 | LCP for NR V2X | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912871 | Remaining Aspects of UL/SL Prioritization | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1912872 | Multiple SL Configured Grants and UE Assistance |
discussion revised to R2-1914869 |
InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1912873 | Handling Multiple Unicast Links in NR V2X | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
noted | [WTS] [JSN] | |
R2-1912874 | RLM/RLF for NR V2X | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912875 | RAN2 Aspects of Simultaneous Configuration of Mode 1 and Mode 2 |
discussion revision of R2-1909591 revised to R2-1914872 |
InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |
R2-1912876 | Draft LS on Handling of Multiple Unicast Links |
LS out LS To: RAN1 |
InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1912877 | Admission Control for NR SL | discussion | InterDigital, Ericsson, MediaTek, CATT, ITL, Xiaomi, Fraunhofer, LG | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
noted | [WTS] [JSN] | |
R2-1912878 | QoS-Based SLRB Establishment Decision | discussion | InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1912879 | Remaining Aspects of Fast MCG Link Recovery using SRB3 | discussion | InterDigital | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1912880 | Summary of Email Discussion [107#32]NR/DCCA] MCG Scell/SCG Resume | discussion | InterDigital | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
noted | [WTS] [JSN] | |
R2-1912881 | On Combining RUDI and CHO |
discussion revised to R2-1914876 |
InterDigital | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1912882 | Conditional PSCell addition/change | discussion | InterDigital | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1912883 | Intra-UE Prioritization for overlapping PUSCHs | discussion | InterDigital | FS_NR_IIOT | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1912884 | Handling of deprioritized PDUs in MAC | discussion | InterDigital | FS_NR_IIOT | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1912885 | Intra UE prioritization between SR and PUSCH |
discussion revised to R2-1914880 |
InterDigital | FS_NR_IIOT | Rel-16 |
R2-107 AI: 6.7.3.3 |
not treated | [WTS] [JSN] | |
R2-1912886 | Scheduling enhancements for TSC traffic |
discussion revision of R2-1909601 |
InterDigital | FS_NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912887 | Paging procedure in NR-U |
discussion revision of R2-1909602 |
InterDigital | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.1 |
not treated | [WTS] [JSN] | |
R2-1912888 | Random access in NR-U | discussion | InterDigital | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1912889 | Handling UL LBT Failures in MAC | discussion | InterDigital | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
noted | [WTS] [JSN] | |
R2-1912890 | CAPC selection for Configured grant transmission in NR-U |
discussion revision of R2-1909605 |
InterDigital | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.6 |
noted | [WTS] [JSN] | |
R2-1912891 | Impact of non-numeric K1 value on DRX Timers | discussion | InterDigital | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.4 |
not treated | [WTS] [JSN] | |
R2-1912892 | RLM and RLF for NR-U |
discussion revision of R2-1909606 revised to R2-1914883 |
InterDigital | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.4 |
not treated | [WTS] [JSN] | |
R2-1912893 | Correction on field description of cellReselectionInfoCommon |
CR revised to R2-1914571 |
Qualcomm Incorporated, Ericsson | 38.331 15.7.0 CR#1278 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
not treated | [WTS] [JSN] |
R2-1912894 | DRX considerations for preconfigured resources |
discussion revision of R2-1910237 revised to R2-1916247 |
Sequans Communications | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |
R2-1912895 | Remaining FFSs for ANR report in NB-IoT | discussion | ZTE Corporation, Sanechips | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.6 |
noted | [WTS] [JSN] | |
R2-1912896 | Remaining issues for D-PUR in IDLE | discussion | ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |
R2-1912897 | Signalling aspects for accurate reference timing delivery in TSC |
discussion revision of R2-1908859 |
ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |
R2-1912898 | Other issues related to accurate reference timing delivery in TSC |
discussion revision of R2-1908860 |
ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | |
R2-1912899 | Correction of cell reselection parameters for multi-beam operation |
CR revised to R2-1914570 |
Qualcomm Incorporated, Ericsson | 38.304 15.5.0 CR#139 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
not treated | [WTS] [JSN] |
R2-1912900 | TP for accurate reference timing delivery in TSC |
draftCR revision of R2-1908886 |
ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | |
R2-1912901 | Remaining issues for EHC in TSC |
discussion revision of R2-1908862 revised to R2-1915615 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |
R2-1912902 | Support of eDRX in CM-CONNECTED with RRC_INACTIVE for 5GC | discussion | ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core |
R2-107 AI: 7.1.12.2 |
noted | [WTS] [JSN] | ||
R2-1912903 | User plane solutions for connecting to 5GC | discussion | ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.12.1 |
not treated | [WTS] [JSN] | |
R2-1912904 | Some remaining issues for Msg4-based MT-EDT | discussion | ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.2 |
not treated | [WTS] [JSN] | |
R2-1912905 | Remaining issues of quality report for non-anchor access | discussion | ZTE Corporation, Sanechips | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.7 |
noted | [WTS] [JSN] | |
R2-1912906 | Remaining issues for DL quality report for eMTC | discussion | ZTE Corporation, Sanechips | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.6 |
noted | [WTS] [JSN] | |
R2-1912907 | Other remaining issues of UE grouping for WUS |
discussion revision of R2-1908870 revised to R2-1915638 |
ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.3 |
not treated | [WTS] [JSN] | |
R2-1912908 | Remaining issue of non-BL UE enhancement |
discussion revised to R2-1915679 |
ZTE Corporation, Sanechips | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.8 |
not treated | [WTS] [JSN] | |
R2-1912909 | Discussion on configuration of CHO | discussion | China Telecommunications |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912910 | Simulations on PDCCH-WUS not applying to the DRX short cycles | discussion | Xiaomi Communications |
R2-107 AI: 6.11.2 |
noted | [WTS] [JSN] | |||
R2-1912911 | Avoid ping pong state transition for sidelink UE | discussion | Beijing Xiaomi Software Tech |
R2-107 AI: 4.3 |
noted | [WTS] [JSN] | |||
R2-1912912 | Discussion on details of PDCP for DAPS | discussion | China Telecommunications |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |||
R2-1912913 | Remaining issue for prioritization for NR V2X | discussion | Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1912914 | Considerations on QoS based resource pool for NR V2X |
discussion revised to R2-1915132 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.4.4 |
not treated | [WTS] [JSN] | ||
R2-1912915 | Further discussion on scheduling enhancement for TSN traffic |
discussion revision of R2-1910288 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1912916 | Paging probability information based UE grouping |
discussion revised to R2-1915136 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 7.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912917 | Consideration on WUS configuration |
discussion revised to R2-1915137 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 7.2.3 |
not treated | [WTS] [JSN] | ||
R2-1912918 | Discussion on PDCCH-WUS missing problems during BWP switching and handover | discussion | Xiaomi Communications |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |||
R2-1912919 | Some issues on the PDCCH-WUS working with C-DRX | discussion | Xiaomi Communications |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |||
R2-1912920 | Considerations on UE power saving for BWP scenarios | discussion | Xiaomi Communications |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |||
R2-1912921 | PRACH prioritization parameters for MPS for Rel-16 | CR | Perspecta Labs, ECD, AT&T, FirstNet, T-Mobile, Sprint, Verizon, Qualcomm, Ericsson | 38.331 15.7.0 CR#1279 catB | NR_newRAT-Core, TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
merged | [WTS] [JSN] |
R2-1912922 | PRACH prioritization procedure for MPS | CR | Perspecta Labs, ECD, AT&T, FirstNet, T-Mobile, Sprint, Verizon, Qualcomm, Ericsson | 38.321 15.7.0 CR#663 catB | NR_newRAT-Core, TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
merged | [WTS] [JSN] |
R2-1912923 | Grouping and Automatic Reconfiguration for Handover Enhancement in LEO NTN |
discussion revision of R2-1905702 |
Mediatek India Technology Pvt. |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912924 | Left issues in idle and inactive mode for NPN | discussion | CMCC | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912925 | Left issues in active mode for NPN | discussion | CMCC | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.3 |
not treated | [WTS] [JSN] | |
R2-1912926 | Further consideration on HARQ configuration in NTN |
discussion revised to R2-1913173 |
CMCC,Huawei,Sony, KT Corp. | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1912927 | Analysis on RAN1 LS on propagation delay compensation | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | |
R2-1912928 | Support on TSN periodicities of non-integer multiple CG-SPS periodicities | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
noted | [WTS] [JSN] | |
R2-1912929 | Draft LS on support of the activation DCI of Type 2 CGs/SPS to adjust the start offset |
LS out LS To: RAN1 |
CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2 |
not treated | [WTS] [JSN] | |
R2-1912930 | Repetitions Transmission for SPS configurations | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2 |
not treated | [WTS] [JSN] | |
R2-1912931 | Down selection on the PDCP Duplication MAC CE Structure | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1912932 | Further discussion on fast HO failure recovery in NR | discussion | CMCC | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.4 |
not treated | [WTS] [JSN] | |
R2-1912933 | Handling of deprioritized transmissions | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1912934 | Handling for CG resource collision of equal priority | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1912935 | BAP mapping support for routing |
discussion revised to R2-1915196 |
CMCC | Rel-16 |
R2-107 AI: 6.1.3.2 |
not treated | [WTS] [JSN] | ||
R2-1912936 | BWP and sub-band switching for NR-U in RACH |
discussion revision of R2-1909436 |
CMCC | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1912937 | Further consideration on consistent LBT failures | discussion | CMCC | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1912938 | Consideration on further CP enhancements for NR-U |
discussion revised to R2-1912965 |
CMCC | Rel-16 |
R2-107 AI: 6.2.2.1 |
revised | [WTS] [JSN] | ||
R2-1912939 | Differentiating steerable and moving cells of LEO | discussion | CMCC | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | ||
R2-1912940 | Using beam footprint information for GEO mobility |
discussion revision of R2-1909439 |
CMCC | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | ||
R2-1912941 | Impact analysis of NR CA frame timing relaxation |
discussion revised to R2-1915199 |
CMCC | Rel-16 |
R2-107 AI: 6.10.6 |
not treated | [WTS] [JSN] | ||
R2-1912942 | Further consideration on PRACH prioritization |
discussion revised to R2-1915200 |
CMCC | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | ||
R2-1912943 | Discussion on the flexible configuration of Maximum Data Rate Enumeration for UP Integrity Protection |
discussion revised to R2-1913172 |
CMCC | Rel-16 |
R2-107 AI: 6.20.1 |
revised | [WTS] [JSN] | ||
R2-1912944 | Mobility-state-based cell reselection in NR for HSDN |
discussion revision of R2-1911253 revised to R2-1915202 |
CMCC, MediaTek Inc | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | ||
R2-1912945 | Discussion on LCP restriction enhancements for DG | discussion | CMCC | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | ||
R2-1912946 | Discussion on fast handover failure recovery | discussion | CMCC | Rel-16 |
R2-107 AI: 6.9.3.4 |
not treated | [WTS] [JSN] | ||
R2-1912947 | HARQ feedback for MsgB | discussion | CMCC | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | ||
R2-1912948 | PUSCH segmentation and repetition |
discussion revision of R2-1909454 |
CMCC | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | ||
R2-1912949 | Discussion of the PUSCH transmission of MsgA |
discussion revision of R2-1909453 |
CMCC | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | ||
R2-1912950 | Handling of de-prioritized MAC PDU | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
withdrawn | [WTS] [JSN] | |
R2-1912951 | Discussion on IE design of TimeReferenceInfo used for IIOT |
discussion revision of R2-1909442 |
CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |
R2-1912952 | [DRAFT] LS to SA3 on privacy concern of transmission of CAG ID |
LS out LS To: SA3 |
CMCC | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1912953 | Discussion of primary path configuration for PDCP duplication | discussion | CMCC | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1912954 | Further discussion on RA type selection | discussion | CMCC |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |||
R2-1912955 | System information for 2-step RACH resources configuration | discussion | CMCC |
R2-107 AI: 6.13.4 |
not treated | [WTS] [JSN] | |||
R2-1912956 | [107#49][NR L2 measurement] Running TS38.314 | discussion | CMCC | NR_SON_MDT-Core |
R2-107 AI: 6.12.3 |
noted | [WTS] [JSN] | ||
R2-1912957 | Draft TS 38.314 v002 | draft TS | CMCC | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
endorsed | [WTS] [JSN] | |
R2-1912958 | TP for TS 38.314 on number of Ues | pCR | CMCC | 38.314 0.0.2 | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] |
R2-1912959 | Discussion on power saving in inter-frequency measurements |
discussion revision of R2-1909432 revised to R2-1915210 |
CMCC |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |||
R2-1912960 | Further consideration on EN-DC cell reselection |
discussion revised to R2-1913233 |
CMCC | Rel-16 |
R2-107 AI: 6. |
revised | [WTS] [JSN] | ||
R2-1912961 | Discussion on support of NR RAN sharing |
discussion revised to R2-1913286 |
CMCC | Rel-16 |
R2-107 AI: 6. |
revised | [WTS] [JSN] | ||
R2-1912962 | Running TS 37.320 CR |
draftCR revised to R2-1913950 |
CMCC | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
revised | [WTS] [JSN] | |
R2-1912963 | LS on Logged Measurements |
LS out LS To: RAN4 |
CMCC | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1912964 | Broadcast Handover in LEO-Satellite based NTN |
discussion revision of R2-1903062 |
Mediatek India Technology Pvt. |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912965 | Consideration on further CP enhancements for NR-U |
discussion revision of R2-1912938 |
CMCC | Rel-16 |
R2-107 AI: 6.2.3.1 |
not treated | [WTS] [JSN] | ||
R2-1912966 | Report of email discussion: [107#44][LTE and NR /feMOB] Discussion on PDCP details for RUDI HO | discussion | Mediatek Inc., Huawei, |
R2-107 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | |||
R2-1912967 | PRACH prioritization parameters for MCS for Rel-16 | CR | FirstNet, Perspecta Labs, Ericsson, Qualcomm | 38.331 15.7.0 CR#1280 catB | NR_newRAT-Core, TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
merged | [WTS] [JSN] |
R2-1912968 | Bearer handling for RUDI during HO with DAPS |
discussion revision of R2-1909180 |
Mediatek Inc., Intel Corporation, Qualcomm Incorporated,Charter Communications, Apple |
R2-107 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | |||
R2-1912969 | PRACH prioritization procedure for MCS for Rel-16 | CR | FirstNet, Perspecta Labs, Ericsson, Qualcomm | 38.321 15.7.0 CR#664 catB | NR_newRAT-Core, TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
merged | [WTS] [JSN] |
R2-1912970 | RLC Impacts analysis with DAPS during HO |
discussion revised to R2-1914611 |
Mediatek Inc. |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |||
R2-1912971 | PDCP Duplication Configuration |
discussion revision of R2-1909239 |
Mediatek Inc. |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912972 | Discussion on the use case of CHO failure recovery | discussion | Beijing Xiaomi Software Tech |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |||
R2-1912973 | Service continuity between TN and NTN | discussion | NEC Telecom MODUS Ltd. |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |||
R2-1912974 | Clarification on RSSI and Channel Occupancy measurement in LAA | CR | Qualcomm Incorporated | 36.331 13.14.0 CR#4109 catF | LTE_LAA-Core | Rel-13 |
R2-107 AI: 4.5 |
not treated | [WTS] [JSN] |
R2-1912975 | Clarification on RSSI and Channel Occupancy measurement in LAA | CR | Qualcomm Incorporated | 36.331 14.12.0 CR#4110 catA | LTE_LAA-Core | Rel-14 |
R2-107 AI: 4.5 |
not treated | [WTS] [JSN] |
R2-1912976 | Clarification on RSSI and Channel Occupancy measurement in LAA | CR | Qualcomm Incorporated | 36.331 15.7.0 CR#4111 catA | LTE_LAA-Core | Rel-15 |
R2-107 AI: 4.5 |
not treated | [WTS] [JSN] |
R2-1912977 | Location based mobility enhancement | discussion | NEC Telecom MODUS Ltd. |
R2-107 AI: 6.6.4 |
not treated | [WTS] [JSN] | |||
R2-1912978 | Downstream Next hop ID design | discussion | NEC Telecom MODUS Ltd. |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |||
R2-1912979 | End to end reliability in IAB | discussion | NEC Telecom MODUS Ltd. |
R2-107 AI: 6.1.4 |
not treated | [WTS] [JSN] | |||
R2-1912980 | Flow control in IAB | discussion | NEC Telecom MODUS Ltd. |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |||
R2-1912981 | IAB backhaul RLF handling | discussion | NEC Telecom MODUS Ltd. |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |||
R2-1912982 | Missing QCI to CAPC mapping |
CR revision of R2-1911628 revised to R2-1913983 |
Nokia, Nokia Shanghai Bell | 36.3 15.7.0 CR#12402 catF | LTE_unlic-Core | Rel-16 |
R2-107 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1912983 | Applicability of CHO agreements to conditional PSCell change | discussion | NEC | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1912984 | Configuration of fast MCG recovery | discussion | NEC | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1912985 | Pcompensation and FR2 | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
noted | [WTS] [JSN] | |
R2-1912986 | Clarification on PO calculation |
CR revised to R2-1915047 |
Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1281 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.2 |
not treated | [WTS] [JSN] |
R2-1912987 | Paging in NR-U | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |
R2-1912988 | Consecutive failed connection attempts in NR-U | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1912989 | Details of early measurement configuration | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912990 | Early measurements and Inter-RAT | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912991 | UE capabilities for early measurements | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912992 | Dormant behaviour | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1912993 | Aspects of MCGFailureInformation over SRB3 | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1912994 | CR on how to introduce x-scheduling with different numerologies | draftCR | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.6 |
not treated | [WTS] [JSN] | |
R2-1912995 | Multiple SMTC for Idle | discussion | Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1912996 | CR on multiple SMTC for idle |
CR revised to R2-1915051 |
Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1282 catF | TEI16 | Rel-15 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1912997 | PDCP uplink transmit operation for split-bearer | CR | Qualcomm Incorporated | 38.323 15.6.0 CR#36 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.3.3 |
not pursued | [WTS] [JSN] |
R2-1912998 | Reselection to a Cell with Valid Dedicated Frequency Offset |
discussion revised to R2-1916026 |
MediaTek Inc, LG Electronics |
R2-107 AI: 4.1 |
postponed | [WTS] [JSN] | |||
R2-1912999 | Reselection to a Cell with Valid Dedicated Frequency Offset | draftCR | MediaTek Inc., LG Electronics | NB_IOT-Core | Rel-15 |
R2-107 AI: 4.1 |
not treated | [WTS] [JSN] | |
R2-1913000 | Mobility Failure Handling with Conditional Handover Candidates | discussion | MediaTek Inc. |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |||
R2-1913001 | Measurement Report for Conditional Handover Procedures |
discussion revision of R2-1908947 revised to R2-1914889 |
MediaTek Inc. |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |||
R2-1913002 | Power Saving for RRM Measurements in NR | discussion | MediaTek Inc. |
R2-107 AI: 6.11.6 |
noted | [WTS] [JSN] | |||
R2-1913003 | CN Type Indication for Cell Reselection from NR to LTE |
discussion revision of R2-1908941 revised to R2-1914892 |
MediaTek Inc. |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |||
R2-1913004 | Considerations on IAB multi connectivity |
discussion revised to R2-1914490 |
KDDI Corporation |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |||
R2-1913005 | Discussion on reselection between NPNs and public networks |
discussion revised to R2-1914492 |
KDDI Corporation |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |||
R2-1913006 | PDU format for msgB | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | ||
R2-1913007 | msgA resource configuration and selection | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.13.4 |
not treated | [WTS] [JSN] | ||
R2-1913008 | Discussion on the MsgA transmission | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | ||
R2-1913009 | Discussion on MsgB reception | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | ||
R2-1913010 | fallback procedure for 2-step RACH | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | ||
R2-1913011 | Differentiation for two-step random access | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | ||
R2-1913012 | MAC aspects of BFR on SCell | discussion | Ericsson | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913013 | Analysis of RRC impacts from multi-beam enhancements | discussion | Ericsson | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913014 | Addition of indication for successful Random access procedure |
CR revised to R2-1915642 |
Ericsson | 38.321 15.7.0 CR#665 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1913015 | UE capabilities for CHO |
discussion revision of R2-1909010 revised to R2-1915556 |
Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1913016 | UE capabilities for RUDI handover |
discussion revision of R2-1909312 revised to R2-1915557 |
Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913017 | Report for email discussion [107#26] [NR/R15] SMTC setting in MR-DC PSCell change (Nokia) | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
not treated | [WTS] [JSN] | |
R2-1913018 | SMTC setting in MR-DC PSCell change |
CR revised to R2-1913979 |
Nokia, Nokia Shanghai Bell | 37.34 15.7.0 CR#157 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1913019 | Clarification regarding the supportedSRS-TxPortSwitch capability | CR | Nokia, Nokia Shanghai Bell | 38.306 15.7.0 CR#175 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not pursued | [WTS] [JSN] |
R2-1913020 | Importing consequences if not approved from RAN1 and RAN4 excel files |
CR revised to R2-1913964 |
Nokia, Nokia Shanghai Bell | 38.306 15.7.0 CR#176 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1913021 | Importing feature index numbers from TR 38.822 | CR | Nokia, Nokia Shanghai Bell | 38.306 15.7.0 CR#177 catD | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not pursued | [WTS] [JSN] |
R2-1913022 | On FR2 CA fall-backs |
discussion revised to R2-1913965 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
revised | [WTS] [JSN] | |
R2-1913023 | Clarifying the alignment of capability filtering across LTE and NR in MR-DC |
CR revised to R2-1914219 |
Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1283 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
revised | [WTS] [JSN] |
R2-1913024 | Clarifying the alignment of capability filtering across LTE and NR in MR-DC | CR | Nokia, Nokia Shanghai Bell | 38.306 15.7.0 CR#178 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
merged | [WTS] [JSN] |
R2-1913025 | Clarifying the interpretation behind the encapsulation of the filter extensions - Option 1 | CR | Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1284 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
not treated | [WTS] [JSN] |
R2-1913026 | Clarifying the interpretation behind the encapsulation of the filter extensions - Option 2 | CR | Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1285 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
not treated | [WTS] [JSN] |
R2-1913027 | Clarifying the interpretation behind the encapsulation of the filter extensions - Option 3 | CR | Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1286 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
not treated | [WTS] [JSN] |
R2-1913028 | Clarifying the interpretation behind the encapsulation of the filter extensions - Option 4 | CR | Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1287 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
postponed | [WTS] [JSN] |
R2-1913029 | UL LBT failure handling | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1913030 | Configured grant for NR-U | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.2.2.5 |
not treated | [WTS] [JSN] | ||
R2-1913031 | Discussion on DRX for NR-U | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.2.2.4 |
noted | [WTS] [JSN] | ||
R2-1913032 | Impacts of Cross-COT HARQ feedback to BWP and SCell | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | ||
R2-1913033 | RAR format and contention resolution for NR-U | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913034 | PRACH and msg3 for NR-U | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913035 | Enhancement on 2-step RACH for NR-U | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.2.2.3 |
not treated | [WTS] [JSN] | ||
R2-1913036 | Conditional PSCell addition and change | discussion | Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1913037 | Consideration on DL positioning method in NR | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913038 | Discussion on broadcasting of positioning assistance data | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.8.2.3 |
not treated | [WTS] [JSN] | ||
R2-1913039 | Consideration on UL positioning method in NR | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913040 | Consideration on Multi-RTT positioning in NR | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913041 | Consideration on E-CID in NR | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913042 | Further discussion on on-demand SI in RRC_CONNECTED | discussion | Huawei, HiSilicon | Rel-16 |
R2-107 AI: 6.21 |
not treated | [WTS] [JSN] | ||
R2-1913043 | Remaining issue on scheduling ehancement for TSN |
discussion revision of R2-1910396 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913044 | Considerations on support of split bearer in the case of PDCP duplication with multiple copies |
discussion revised to R2-1916073 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1913045 | Discussion on UE based PDCP Duplication activationdeactivation |
discussion revised to R2-1916074 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.2 |
not treated | [WTS] [JSN] | |
R2-1913046 | Consideration on the multiplexing BSR MAC CE and URLLC data |
discussion revision of R2-1910398 revised to R2-1916075 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.4 |
not treated | [WTS] [JSN] | |
R2-1913047 | Consideration on HARQ conflict between configured grant and dynamic grant |
discussion revision of R2-1910402 revised to R2-1916076 |
ZTE Corporation, Sanechips | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1913048 | Considerations on Beam failure Recovery for SCell | discussion | ZTE Corporation, Sanechips | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913049 | Consideration on Enhancement of TCI state for Multi-TRP transmission | discussion | ZTE Corporation, Sanechips | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | |
R2-1913050 | Remaining issues on the impact from WUS signal |
discussion revision of R2-1910403 |
ZTE Corporation, Sanechips | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.2 |
noted | [WTS] [JSN] | |
R2-1913051 | Discussion on the ambiguity in calculation of RA-RNTI |
discussion revised to R2-1916077 |
ZTE Corporation, Sanechips | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913052 | Discussion on human-readable network name | discussion | China Telecom, Huawei, HiSilicon |
R2-107 AI: 6.18.2 |
withdrawn | [WTS] [JSN] | |||
R2-1913053 | DL PDCP handling for RLC AM |
discussion revised to R2-1915451 |
NEC | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913054 | DL PDCP handling for RLC UM |
discussion revised to R2-1915452 |
NEC | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913055 | Capability coordination for DAPS based handover | discussion | NEC | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913056 | Behaviours when handover configuration exceeds UE capabilities | discussion | NEC | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913057 | Failure handling and RLF report for CHO |
discussion revised to R2-1915454 |
NEC | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |
R2-1913058 | Discussion on human-readable network name | discussion | China Telecom, Huawei, HiSilicon |
R2-107 AI: 6.18.2 |
withdrawn | [WTS] [JSN] | |||
R2-1913059 | Introduction of RRC parameters and UE capabilities for enhanced high speed scenario |
CR revision of R2-1911471 revised to R2-2002048 |
NTT DOCOMO INC. | 36.331 15.7.0 CR#40952 catB | LTE_high_speed-Core | Rel-16 |
R2-107 AI: 7.4 |
agreed | [WTS] [JSN] |
R2-1913060 | Discussion on human-readable network name | discussion | China Telecom, Huawei, HiSilicon |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |||
R2-1913061 | Paging opportunities overlapping for the NR-U |
discussion revision of R2-1909957 revised to R2-1915072 |
ITRI | NR_unlic-Core |
R2-107 AI: 6.2.3.1 |
not treated | [WTS] [JSN] | ||
R2-1913062 | Msg1 transmission opportunities |
discussion revision of R2-1909955 revised to R2-1915070 |
ITRI | NR_unlic-Core |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913063 | Backhaul RLF handling |
discussion revision of R2-1909960 |
ITRI | NR_IAB-Core |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | ||
R2-1913064 | Handling of consistent UL LBT failures during HO |
discussion revised to R2-2000737 |
ITRI | NR_unlic-Core |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1913065 | Trigger Conditions for low-latency IAB Uplink Scheduling |
discussion revised to R2-1915068 |
ITRI | NR_IAB-Core |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | ||
R2-1913066 | Introduction of UE capabilities for further performance enhancement for LTE in high speed scenario in Rel-16 |
CR revision of R2-1909772 revised to R2-2002050 |
CMCC, Huawei, HiSilicon, NTTDOCOMO, INC. | 36.306 15.6.0 CR#17122 catB | LTE_high_speed_enh2-Core | Rel-16 |
R2-107 AI: 7.4 |
agreed | [WTS] [JSN] |
R2-1913067 | Clarification of PDCCH monitoring period with non-zero DRX-startoffset for NB-IoT |
CR revised to R2-1914097 |
NTT DOCOMO INC. | 36.321 15.7.0 CR#1458 catF | NB_IOTenh2-Core | Rel-15 |
R2-107 AI: 4.1 |
revised | [WTS] [JSN] |
R2-1913068 | Discussion on phase of the LTE CHO procedure |
discussion revised to R2-1914174 |
China Telecommunications |
R2-107 AI: 6.9.3.3 |
revised | [WTS] [JSN] | |||
R2-1913069 | Discussion on the deployment for CAG | discussion | China Telecommunications |
R2-107 AI: 6.18.2 |
withdrawn | [WTS] [JSN] | |||
R2-1913070 | Discussion on the deployment for CAG | discussion | China Telecom, Huawei, HiSilicon |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |||
R2-1913071 | Further consideration on D-PUR aspect | discussion | III | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913072 | Discussion on MDT in DC scenario |
discussion revision of R2-1909803 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913073 | MDT activation for INACTIVE&IDLE mode UE |
discussion revision of R2-1909805 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913074 | Immediate MDT continuity upon handover procedure |
discussion revision of R2-1909804 revised to R2-1915413 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913075 | Discussion on out-of-coverage measurement and report |
discussion revision of R2-1909806 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913076 | Restriction on MDT measurement and report |
discussion revision of R2-1909807 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913077 | Discussion on RLF & CEF report |
discussion revision of R2-1909802 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1913078 | Further consideration on RACH optimization |
discussion revised to R2-1915419 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | ||
R2-1913079 | Further consideration on INACTIVE UE counting | discussion | ZTE Corporation, Sanechips | NR_SON_MDT-Core |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | ||
R2-1913080 | Correction on the definition of over-the-air delay in UL | discussion | ZTE Corporation, Sanechips | NR_SON_MDT-Core |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | ||
R2-1913081 | Discussion on PRB usage of a cell |
discussion revision of R2-1909222 revised to R2-1915418 |
ZTE Corporation, Sanechips | NR_SON_MDT-Core |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | ||
R2-1913082 | Enhancement on RACH procedure for SI request | CR | ZTE Corporation, Sanechips | 38.321 15.7.0 CR#666 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1913083 | Further consideration on MAC enhancements | discussion | ZTE Corporation, Sanechips | FS_NR_NTN_solutions |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | ||
R2-1913084 | Handling of de-prioritized MAC PDUs | discussion | III | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1913085 | Consideration on UL low-latency scheduling |
discussion revision of R2-1910538 revised to R2-1915126 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | ||
R2-1913086 | Pre-emptive BSR in multiple connection scenario |
discussion revised to R2-1915127 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | ||
R2-1913087 | Cell selection for IAB RLF recovery |
discussion revision of R2-1910547 revised to R2-1915128 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | ||
R2-1913088 | RLF notification to downstream IAB node |
discussion revision of R2-1911231 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | ||
R2-1913089 | Failure handling with CHO candidate |
discussion revision of R2-1910615 |
Lenovo, Motorola Mobility | Rel-16 |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | ||
R2-1913090 | Further consideration on On demand SI in RRC_CONNECTED | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-107 AI: 6.21 |
not treated | [WTS] [JSN] | ||
R2-1913091 | Handling of De-prioritized MAC PDUs | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1913092 | Remaining Issues for Resource Conflicts Involving SR | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.3 |
not treated | [WTS] [JSN] | |
R2-1913093 | On Primary Path of PDCP Duplication | discussion | Nokia, Nokia Shanghai Bell, NTT Docomo, Samsung, CATT, NEC, III, Qualcomm, Lenovo | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
noted | [WTS] [JSN] | |
R2-1913094 | MAC CE Format and Network Coordination for Uplink PDCP Duplication | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1913095 | Introduction of additional enhancements for NB-IoT | draftCR | Qualcomm Incorporated | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
not treated | [WTS] [JSN] | |
R2-1913096 | WUS grouping design overview and UE distribution | discussion | Qualcomm Incorporated | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.3 |
not treated | [WTS] [JSN] | |
R2-1913097 | Non-anchor carrier measurements for RRM | discussion | Qualcomm Incorporated | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.7 |
noted | [WTS] [JSN] | |
R2-1913098 | Support for UE specific DRX in NB-IoT | discussion | Qualcomm Incorporated | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.11 |
noted | [WTS] [JSN] | |
R2-1913099 | Draft LS on UE specific DRX in NB-IoT |
LS out LS To: SA2, CT1 |
Qualcomm Incorporated | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.11 |
not treated | [WTS] [JSN] | |
R2-1913100 | Introduction of additional enhancements for eMTC | discussion | Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
not treated | [WTS] [JSN] | |
R2-1913101 | Outstanding issues and TP for ETWS/CMAS support by non-BL UE | discussion | Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.8 |
withdrawn | [WTS] [JSN] | |
R2-1913102 | TP for downlink channel quality reporting in MSG3 for eMTC | discussion | Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.6 |
not treated | [WTS] [JSN] | |
R2-1913103 | Open issues and TP for ETWS/CMAS support by non-BL UE | discussion | Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.8 |
noted | [WTS] [JSN] | |
R2-1913104 | On efficient transition from RRC_CONNECTED to RRC_IDLE/RRC_INACTIVE | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.3 |
not treated | [WTS] [JSN] | |
R2-1913105 | On UE assistance for C-DRX configuration | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.5 |
not treated | [WTS] [JSN] | |
R2-1913106 | Dedicated RRM Measurement Relaxation | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913107 | Further details on WUS | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |
R2-1913108 | Further details on RRM measurement relaxation | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913109 | On adaptation of maximum number of MIMO layers | discussion | Nokia, Nokia Shanghai Bell | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.4 |
not treated | [WTS] [JSN] | |
R2-1913110 | On combined RRC procedures |
discussion revised to R2-1914651 |
Nokia, Nokia Shanghai Bell, Ericsson | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913111 | RRC processing delays for combined procedures |
CR revised to R2-1914652 |
Nokia, Nokia Shanghai Bell, Ericsson | 38.331 15.7.0 CR#1288 catF | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913112 | Remaining issues in Msg4-based MT EDT | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-107 AI: 7.1.2 |
noted | [WTS] [JSN] | ||
R2-1913113 | Scheduling enhancements for LTE-MTC and NB-IoT | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-107 AI: 7.1.5 |
noted | [WTS] [JSN] | ||
R2-1913114 | MPDCCH performance improvement for LTE-M | discussion | Ericsson | LTE_eMTC5-Core |
R2-107 AI: 7.1.7 |
noted | [WTS] [JSN] | ||
R2-1913115 | ETWS/CMAS notification delivery in connected mode for non-BL UEs in CE | discussion | Ericsson | LTE_eMTC5-Core |
R2-107 AI: 7.1.8 |
noted | [WTS] [JSN] | ||
R2-1913116 | S-Criterion interpretation for non-BL UEs | discussion | Ericsson | LTE_eMTC5-Core |
R2-107 AI: 7.1.8 |
not treated | [WTS] [JSN] | ||
R2-1913117 | Cell Reselection improvement for LTE-M Standalone cells |
discussion revised to R2-1915401 |
Ericsson | LTE_eMTC5-Core |
R2-107 AI: 7.1.9 |
not treated | [WTS] [JSN] | ||
R2-1913118 | Remaining issues for UP solution and 5GC | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-107 AI: 7.1.12.1 |
noted | [WTS] [JSN] | ||
R2-1913119 | PUR periodicity and UE multiplexing |
discussion revision of R2-1910437 |
Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913120 | PUR with DCI scheduling |
discussion revision of R2-1910438 |
Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913121 | PUR data transmission - remaining open issues | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913122 | PUR configuration - remaining open issues | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913123 | PDCP type when connecting LTE-M and NB-IoT to 5GC | discussion | Ericsson | NB_IOTenh3-Core, LTE_eMTC5-Core |
R2-107 AI: 7.2.10.1 |
noted | [WTS] [JSN] | ||
R2-1913124 | Discussion on leftover issues of Inter-RAT measurement | discussion | Huawei, HiSilicon, China Unicom | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-107 AI: 6.14.2 |
not treated | [WTS] [JSN] | |
R2-1913125 | Discusion on the SRVCC capability | discussion | Huawei, HiSilicon | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-107 AI: 6.14.3 |
not treated | [WTS] [JSN] | |
R2-1913126 | Running CR for the introduction of SRVCC from 5G to 3G |
draftCR revised to R2-1914014 |
Huawei, HiSilicon, China Unicom | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-107 AI: 6.14.1 |
revised | [WTS] [JSN] | |
R2-1913127 | Discussion on SL radio link management |
discussion revision of R2-1910031 revised to R2-1915186 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | ||
R2-1913128 | Report buffer status with one padding byte |
CR revision of R2-1910358 |
Google Inc. | 38.321 15.7.0 CR#6541 catC | NR_newRAT-Core, TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1913129 | Additional opportunity for Msg1 in 4-step RACH |
discussion revision of R2-1911198 revised to R2-1915920 |
LG Electronics Inc. | NR_unlic-Core |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913130 | Problems in BFD-inspired detection mechanism for consistent UL LBT failures | discussion | LG Electronics Inc. | NR_unlic-Core |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1913131 | Dynamic DL opportunity enhancement based on channel busy level in NR-U |
discussion revision of R2-1909830 revised to R2-1915921 |
LG Electronics Inc. | NR_unlic-Core |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | ||
R2-1913132 | Measurement enhancement for channel occupancy |
discussion revision of R2-1911199 |
LG Electronics Inc. | NR_unlic-Core |
R2-107 AI: 6.2.3.4 |
not treated | [WTS] [JSN] | ||
R2-1913133 | Periodicity misalignment between TSN traffic and SPS/CG | discussion | LG Electronics Inc. | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913134 | LCP enhancements for mapping between LCH and CG | discussion | LG Electronics Inc. | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.2 |
noted | [WTS] [JSN] | ||
R2-1913135 | Measurement gap skipping for TSN traffic |
discussion revision of R2-1909831 revised to R2-1915919 |
LG Electronics Inc. | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.3 |
not treated | [WTS] [JSN] | ||
R2-1913136 | Impact of intra-UE prioritization on SR cancellation |
discussion revision of R2-1911207 |
LG Electronics Inc. | NR_IIOT-Core |
R2-107 AI: 6.7.3.3 |
not treated | [WTS] [JSN] | ||
R2-1913137 | Discussion on beam failure recovery for SCell | discussion | LG Electronics Inc. | NR_eMIMO-Core |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | ||
R2-1913138 | Need for fast transition to RRC_IDLE | discussion | LG Electronics Inc. | NR_UE_pow_sav-Core |
R2-107 AI: 6.11.3 |
not treated | [WTS] [JSN] | ||
R2-1913139 | Consideration on UE assistance information | discussion | LG Electronics Inc. | NR_UE_pow_sav-Core |
R2-107 AI: 6.11.5 |
not treated | [WTS] [JSN] | ||
R2-1913140 | Discussion on the impact of WUS on drx-onDurationTimer | discussion | LG Electronics Inc. | NR_UE_pow_sav-Core |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | ||
R2-1913141 | Consideration on PDCCH-based power saving signals | discussion | LG Electronics Inc. | NR_UE_pow_sav-Core |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | ||
R2-1913142 | Consideration on dormancy behavior | discussion | LG Electronics Inc. | LTE_NR_DC_CA_enh-Core |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | ||
R2-1913143 | Confirmation MAC CE for multiple CG configurations |
discussion revision of R2-1911201 |
LG Electronics Inc. | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1913144 | Discussion on HARQ and RNTI design for msgB | discussion |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | ||||
R2-1913145 | Discussion on simultaneous connectivity in CHO |
discussion revised to R2-1914701 |
vivo | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1913146 | Even further views on NR V2X System Information |
discussion revision of R2-1909279 revised to R2-1915392 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913147 | Unresolved issues on SL and UL prioritization | discussion | Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913148 | On NR V2X Sidelink transmissions during Handover or Uu PHY layer problems |
discussion revised to R2-1915193 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913149 | On PC5 capability transfer and link management |
discussion revision of R2-1909283 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913150 | Network Based Monitoring and Reporting of QoS parameters for NR V2X Sidelink |
discussion revision of R2-1909284 revised to R2-1915188 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1913151 | On RRC Reconfigurations in CHO-prepared state |
discussion revised to R2-2001002 |
Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1913152 | On RRC processing and CHO command compliance check | discussion | Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1913153 | Failure handling in the presence of prepared CHO candidates | discussion | Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |
R2-1913154 | Mobility Robustness for DAPS eMBB handover |
discussion revision of R2-1909039 |
Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1913155 | Further thoughts on RLF detection in NR | discussion | Nokia, Nokia Shanghai Bell | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.4 |
not treated | [WTS] [JSN] | |
R2-1913156 | Remaining Details on UL User Data Transmission Switching in eMBB | discussion | Nokia, Nokia Shanghai Bell | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
not treated | [WTS] [JSN] | |
R2-1913157 | On early data forwarding and per-DRB eMBB Handover |
discussion revised to R2-1915496 |
Nokia, Nokia Shanghai Bell | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913158 | Correction to nrofSS-BlocksToAverage and nrofCSInrofCSI-RS-ResourcesToAverage description | CR | Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1289 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1913159 | Missing reportAddNeighMeas in periodic measurement reporting |
CR revised to R2-1915504, R2-2001009, R2-2003109 |
Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#1290 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1913160 | Mobility challenges for NR V2X platooning/groupcast |
discussion revision of R2-1909300 revised to R2-1915187 |
Nokia, Nokia Shanghai Bell | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1913161 | Latency reduction enhancements for SCG RACH procedure |
discussion revised to R2-1915865 |
Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.4 |
not treated | [WTS] [JSN] | |
R2-1913162 | UE behavior upon consistenB2:AE10t UL LBT failures | discussion | Fujitsu | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
withdrawn | [WTS] [JSN] | |
R2-1913163 | On PDU overwritten in NR-U configured grant | discussion | Fujitsu | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.5 |
not treated | [WTS] [JSN] | |
R2-1913164 | Discussion on sidelink SR trigger |
discussion revised to R2-1914998 |
Fujitsu | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913165 | RLM/RLF for unicast in NR V2X | discussion | Fujitsu | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913166 | MAC CE structure for PDCP duplication activation deactivation |
discussion revised to R2-1914999 |
Fujitsu | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1913167 | NW-based per-packet PDCP duplication |
discussion revised to R2-1915000 |
Fujitsu | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1913168 | Considerations on MsgB reception |
discussion revised to R2-1915001 |
Fujitsu | NR_2step_RACH | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1913169 | On open questions to 2-step CF-RACH |
discussion revised to R2-1915002 |
Fujitsu | NR_2step_RACH | Rel-16 |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |
R2-1913170 | SR_COUNTER initialization due to RRC reconfiguration |
discussion revised to R2-1915003 |
Fujitsu, LG Electronics Inc. | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913171 | Consideration on MAC CE design for single PDCCH based multi-TRP transmission |
discussion revision of R2-1909773 |
CMCC | Rel-16 |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | ||
R2-1913172 | Discussion on the flexible configuration of Maximum Data Rate Enumeration for UP Integrity Protection |
discussion revision of R2-1912943 revised to R2-1915201 |
CMCC, Huawei, Hisilicon | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | ||
R2-1913173 | Further consideration on HARQ configuration in NTN |
discussion revision of R2-1912926 revised to R2-1913975 |
CMCC,Huawei,HiSilicon,Sony,KT Corp. | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1913174 | Service continuity and feeder link switch in NTN | pCR | Huawei, HiSilicon | 38.821 0.7.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.3 |
not treated | [WTS] [JSN] |
R2-1913175 | Discussion on TA management and cell reselection in NTN | pCR | Huawei, HiSilicon | 38.821 0.7.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] |
R2-1913176 | Discussion on inactive state in NTN | pCR | Huawei, HiSilicon | 38.821 0.7.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] |
R2-1913177 | Running CR to TS 38.331 on IAB for NR |
draftCR revised to R2-1914010 |
Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.2 |
revised | [WTS] [JSN] | |
R2-1913178 | Draft CR to 38.331 on IAB for enhancements to existing signaling for TDD pattern configuration | draftCR | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |
R2-1913179 | Summary for Email Discussion [107#53] [NR_IAB-Core] Routing | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.1 |
noted | [WTS] [JSN] | |
R2-1913180 | Remaining Issues for BAP Layer | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.4 |
not treated | [WTS] [JSN] | |
R2-1913181 | Uplink BH RLC Channel Mapping in IAB Nodes | discussion | Ericsson, KDDI | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.2 |
not treated | [WTS] [JSN] | |
R2-1913182 | LCID and LCG Extension in IAB Networks | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.2 |
noted | [WTS] [JSN] | |
R2-1913183 | Remaining Issues Related to Flow Control | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |
R2-1913184 | Further details for BSR in IAB Networks | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1913185 | On Multi-connectivity for IAB | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |
R2-1913186 | Access Identities and Access Categories for IAB Nodes | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.3 |
not treated | [WTS] [JSN] | |
R2-1913187 | Allowing only IAB Nodes in a Standalone NR Deployment | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.3 |
not treated | [WTS] [JSN] | |
R2-1913188 | Backhaul link RLF Notification Types to Downstream Node(s) | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |
R2-1913189 | Support for LTE Deployment at IAB Node Sites | discussion | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.3 |
not treated | [WTS] [JSN] | |
R2-1913190 | Draft CR to 38.300 on IAB to add definitions for IAB-MT and IAB-DU | draftCR | Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |
R2-1913191 | Correction on T322 |
CR revised to R2-1914091 |
Nokia, Nokia Shanghai Bell | 36.331 14.12.0 CR#4112 catF | NB_IOTenh-Core | Rel-14 |
R2-107 AI: 4.1 |
revised | [WTS] [JSN] |
R2-1913192 | Correction on T322 |
CR revised to R2-1914650 |
Nokia, Nokia Shanghai Bell | 36.331 15.7.0 CR#4113 catA | NB_IOTenh-Core | Rel-15 |
R2-107 AI: 4.1 |
not treated | [WTS] [JSN] |
R2-1913193 | Correction on the actions for frequencyBandList in SIB1 and SIB2 | CR | Ericsson, MediaTek | 38.331 15.7.0 CR#1291 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.6 |
not treated | [WTS] [JSN] |
R2-1913194 | RAN2 impact of undefined Pmax for FR2 in REL-15 | discussion | Ericsson, NTT Docomo Inc. | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
not treated | [WTS] [JSN] | |
R2-1913195 | Correction for P-Max in FR2 |
CR revised to R2-1915287 |
Ericsson, NTT DOCOMO INC. | 38.331 15.7.0 CR#1292 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R2-1913196 | cDRX enhancement for CA |
discussion revised to R2-1915289 |
Ericsson, Qualcomm Inc., Samsung, Verizon, Deutsche Telekom | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913197 | RAN2 impact of WUS in connected mode | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |
R2-1913198 | UE assistance for RRC connection release | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.3 |
noted | [WTS] [JSN] | |
R2-1913199 | UE adaptation to maximum number of MIMO layers | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.4 |
not treated | [WTS] [JSN] | |
R2-1913200 | UE Assistance Information for cDRX configuration | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.5 |
noted | [WTS] [JSN] | |
R2-1913201 | UE Assistance Information for SCell configuration | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.5 |
not treated | [WTS] [JSN] | |
R2-1913202 | RRM measurement relaxation | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913203 | Considerations on user plane for DAPS | discussion | Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913204 | Considerations on UE capability coordination | discussion | Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913205 | Considerations on control plane for DAPS | discussion | Huawei, HiSilicon,China Telecom | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913206 | Problems of ROHC handling for DAPS | discussion | Huawei, HiSilicon | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913207 | Further consideration on reply LSs from RAN1 and RAN4 | discussion | Huawei, HiSilicon,China Telecom | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.1 |
not treated | [WTS] [JSN] | |
R2-1913208 | Discussion on Groupcast and Broadcast QoS Report | discussion | ITRI |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1913209 | Details of hop-by-hop flow control | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |
R2-1913210 | Signalling for radio aware scheduling | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1913211 | Discussion on number of LCIDs and LCGs for IAB | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.2 |
not treated | [WTS] [JSN] | |
R2-1913212 | Discussion on MAC subheader structures for IAB | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.2 |
noted | [WTS] [JSN] | |
R2-1913213 | Buffer status reporting for IAB | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.3 |
not treated | [WTS] [JSN] | |
R2-1913214 | T_delta signalling for IAB timing | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.3 |
not treated | [WTS] [JSN] | |
R2-1913215 | Increasing Tx opportunities for Msg1 | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |
R2-1913216 | Msg2 format and contention resolution based on LBT outcome of Msg3 | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |
R2-1913217 | RNTI design for MsgB reception | discussion | Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1913218 | Draft LS on MsgB RNTI design |
LS out LS To: TSG RAN WG1 |
Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1913219 | Further design aspects of MsgB MAC subheader formats | discussion | Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |
R2-1913220 | New TAC MAC CE for 2-step RACH | discussion | Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |
R2-1913221 | Preamble groups for 2-step RACH | discussion | Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.5 |
noted | [WTS] [JSN] | |
R2-1913222 | CFRA for 2-step RACH | discussion | Nokia, Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |
R2-1913223 | BFR procedure for SCell | discussion | Nokia, Nokia Shanghai Bell | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913224 | Candidate detection and MAC CE format for SCell BFR | discussion | Nokia, Nokia Shanghai Bell | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913225 | Draft CR on Introduction of SCell BFR | draftCR | Nokia, Nokia Shanghai Bell | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913226 | CFRA resource handling for BFR upon TAT expiry | discussion | Nokia, Nokia Shanghai Bell, Apple | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913227 | PDCP handling and RLC UM support for RUDI HO | discussion | Nokia, Nokia Shanghai Bell | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913228 | NR UE-based Positioning Modes and Geographical Information | discussion | ITRI | NR_pos-Core |
R2-107 AI: 6.8.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913229 | Clarification to CA fallback band combinations | CR | Nokia, Nokia Shanghai Bell | 38.306 15.7.0 CR#179 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1913230 | Efficient RRC configuration with low latency | discussion | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.4 |
not treated | [WTS] [JSN] | |
R2-1913231 | Support of multiple LTE CRS rate matching patterns |
CR revision of R2-1909015 |
Nokia, Nokia Shanghai Bell, Ericsson | 38.331 15.7.0 CR#11331 catC | TEI16 | Rel-16 |
R2-107 AI: 6.20.3 |
postponed | [WTS] [JSN] |
R2-1913232 | Support of multiple LTE CRS rate matching patterns |
CR revision of R2-1909016 |
Nokia, Nokia Shanghai Bell, Ericsson | 38.306 15.7.0 CR#1411 catC | TEI16 | Rel-16 |
R2-107 AI: 6.20.3 |
postponed | [WTS] [JSN] |
R2-1913233 | Further consideration on EN-DC cell reselection |
discussion revision of R2-1912960 revised to R2-1915219 |
CMCC, Huawei, vivo, ZTE, OPPO, xiaomi | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | ||
R2-1913234 | Conditional presence on ue-CapabilityInfo and servCellIndexRangeSCG for inter-MN handover without SN change |
draftCR revised to R2-1914904 |
NTT DOCOMO, INC. | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
not treated | [WTS] [JSN] | |
R2-1913235 | Prioritization between NR-UL and NR-SL | discussion | MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913236 | Remaining issues of SL LCP |
discussion revision of R2-1911127 revised to R2-1914654 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913237 | On SL configured grant |
discussion revision of R2-1911128 revised to R2-1914655 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913238 | Support of simultaneous mode 1 and mode 2 |
discussion revised to R2-1914656 |
MediaTek Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |
R2-1913239 | MAC CE format for single PDCCH multi-TRP |
discussion revision of R2-1911129 |
MediaTek Inc. | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | |
R2-1913240 | Support BFR for SCell | discussion | MediaTek Inc. | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913241 | Solution for intra-UE prioritization | discussion | Huawei, HiSilicon | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |
R2-1913242 | Handling of de-prioritized MAC PDU due to intra-UE prioritization | discussion | Huawei, HiSilicon, SIA | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1913243 | Prioritization issues for MAC Ces | discussion | Huawei, HiSilicon, SIA | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.3 |
not treated | [WTS] [JSN] | |
R2-1913244 | Activation/deactivation of PDCP duplication of up to 4 legs | discussion | Huawei, HiSilicon | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1913245 | Cell restriction for PDCP duplication with up to 4 legs | discussion | Huawei, HiSilicon | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
noted | [WTS] [JSN] | |
R2-1913246 | Configuration of early measurments by SN | discussion | Samsung Telecommunications | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1913247 | Remaining aspects on early measurement configuration | discussion | Samsung, MediaTek Incorporated, ZTE Corporation, Sanechips, Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1913248 | CA/ DC enhancements, signalling reduction | discussion | Samsung Telecommunications | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.4 |
not treated | [WTS] [JSN] | |
R2-1913249 | Immediate MDT, inter-node aspects | discussion | Samsung Telecommunications | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913250 | Logged MDT, inter-node aspects (SN configuration) | discussion | Samsung Telecommunications | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913251 | MDT for early measurments (Logged, immediate) | discussion | Samsung Telecommunications | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913252 | General framework to harmonise transfer of UE information | discussion | Samsung Telecommunications | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.5 |
not treated | [WTS] [JSN] | |
R2-1913253 | Report of email discussion [107#08][NR IAB] Running BAP CR | discussion | Huawei, HiSilicon | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3 |
noted | [WTS] [JSN] | |
R2-1913254 | Running CR for TS 38.340 (BAP) |
pCR revised to R2-1914006 |
Huawei, HiSilicon | 38.34 0.0.0 | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3 |
revised | [WTS] [JSN] |
R2-1913255 | Correction on initial DL BWP and CORESET#0 | CR | Huawei, MediaTek, HiSilicon | 38.331 15.7.0 CR#1293 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.1 |
merged | [WTS] [JSN] |
R2-1913256 | Correction on capabilities of BWP bandwidth | CR | Huawei, HiSilicon | 38.306 15.7.0 CR#180 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.1 |
postponed | [WTS] [JSN] |
R2-1913257 | Correction on camping conditions | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1294 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.1 |
postponed | [WTS] [JSN] |
R2-1913258 | Introduction of a second SMTC per frequency carrier in idle/inactive |
CR revision of R2-1910673 revised to R2-1914660 |
Orange, AT&T, Vodafone, Telecom Italia S.p.A., CMCC, Samsung, Ericsson | 38.331 15.7.0 CR#12181 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913259 | Periodic CSI and SRS with wake-up indication |
discussion revision of R2-1910085 revised to R2-1915550 |
MediaTek Inc. | FS_NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.2 |
noted | [WTS] [JSN] | |
R2-1913260 | On consistent LBT failures |
discussion revised to R2-1915544 |
MediaTek Inc. | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913261 | RAR design for NR-U |
discussion revised to R2-1915545 |
MediaTek Inc. | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913262 | On PHR and autonomous retransmissions |
discussion revision of R2-1910079 revised to R2-2000842 |
MediaTek Inc. | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | |
R2-1913263 | MAC behaviour for LBT failures in Msg3 transmissions |
discussion revision of R2-1910078 |
MediaTek Inc. | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913264 | MsgB format proposal for 2-step RACH | discussion | MediaTek Inc. | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |
R2-1913265 | Ethernet Header Compression Message Format |
discussion revision of R2-1910075 revised to R2-1915546 |
MediaTek Inc. | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |
R2-1913266 | Misalignment Between TSC and SPS/CG Periodicities |
discussion revision of R2-1910074 |
MediaTek Inc. | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913267 | Propagation Delay Compensation by the gNB |
discussion revision of R2-1910073 revised to R2-1915547 |
MediaTek Inc. | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | |
R2-1913268 | Reconfiguration with sync for NE-DC |
CR revised to R2-1913970 |
Google Inc. | 38.331 15.7.0 CR#1295 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
revised | [WTS] [JSN] |
R2-1913269 | Introduction of a second SMTC for inter-RAT cell reselection |
CR revised to R2-1914661 |
Orange, AT&T, Vodafone, Telecom Italia S.p.A., CMCC, Samsung, Ericsson | 36.331 15.7.0 CR#4114 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913270 | Reconfiguration failure in NE-DC |
CR revised to R2-1915559 |
Google Inc. | 36.331 15.7.0 CR#4115 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
agreed | [WTS] [JSN] |
R2-1913271 | Reconfiguration failure in NE-DC | CR | Google Inc. | 36.331 15.7.0 CR#4116 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
reserved | [WTS] [JSN] |
R2-1913272 | Support of releasing UL configuration |
CR revision of R2-1909853 revised to R2-1914671 |
Huawei, HiSilicon, CMCC, China Telecom, MediaTek Inc., Vodafone, Orange, vivo, OPPO, Spreadtrum Communications | 38.331 15.7.0 CR#11681 catF | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913273 | PDCP configuration generation (email discussion of 107#25) |
CR revised to R2-1915588 |
Huawei, HiSilicon | 37.34 15.7.0 CR#158 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1913274 | Resource Pool Configuration |
discussion revised to R2-1915173 |
LG Electronics Inc. | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1913275 | NR V2X System Information Aspects |
discussion revision of R2-1909838 revised to R2-1915175 |
LG Electronics Inc. | Rel-16 |
R2-107 AI: 6.4.4 |
not treated | [WTS] [JSN] | ||
R2-1913276 | SLRB Management in NR V2X | discussion | LG Electronics Inc. | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | ||
R2-1913277 | Simultaneous Mode 1 and Mode 2 Configuration |
discussion revised to R2-1915178 |
LG Electronics Inc. | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | ||
R2-1913278 | On PRS Information for NR Positioning | discussion | LG Electronics Inc. | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913279 | Correction on the frequency indication in SIB2 |
CR revised to R2-1914209 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1296 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.6 |
revised | [WTS] [JSN] |
R2-1913280 | Correction on EUTRAN terminology | CR | Huawei, HiSilicon | 38.305 15.4.0 CR#14 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.3 |
agreed | [WTS] [JSN] |
R2-1913281 | Remaining issues for the MAC specification | CR | Huawei, HiSilicon | 38.321 15.7.0 CR#667 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.3.1 |
not pursued | [WTS] [JSN] |
R2-1913282 | Correction on PRACH re-transmission for SRS carrier switching |
CR revised to R2-1913956 |
Huawei, HiSilicon, MediaTek | 38.321 15.7.0 CR#668 catF | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
revised | [WTS] [JSN] |
R2-1913283 | Correction on PUSCH frequency hopping | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1297 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.1 |
merged | [WTS] [JSN] |
R2-1913284 | Correction on synchoronous reconfiguration | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1298 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
merged | [WTS] [JSN] |
R2-1913285 | Correction on delta signalling for handover | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1299 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
not pursued | [WTS] [JSN] |
R2-1913286 | Discussion on support of NR RAN sharing |
discussion revision of R2-1912961 revised to R2-1915220 |
CMCC | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | ||
R2-1913287 | Remaining issues on UL LBT | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
noted | [WTS] [JSN] | |
R2-1913288 | Non-numeric K1 impacts | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.4 |
noted | [WTS] [JSN] | |
R2-1913289 | Multiple configured grants for NR-U | discussion | Nokia, Nokia Shanghai Bell | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.5 |
not treated | [WTS] [JSN] | |
R2-1913290 | CAPC for configured grant and dynamic grant | discussion | Nokia, Nokia Shanghai Bell, Lenovo | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.6 |
noted | [WTS] [JSN] | |
R2-1913291 | Stage-2 running CR for 2-step RACH | draftCR | Nokia (rapporteur), Nokia Shanghai Bell | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.1 |
endorsed | [WTS] [JSN] | |
R2-1913292 | Further consideration on logged MDT |
discussion revision of R2-1909451 |
CMCC |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |||
R2-1913293 | UE behavior upon consisten UL LBT failures | discussion | Fujitsu | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
withdrawn | [WTS] [JSN] | |
R2-1913294 | UE behavior upon consistent UL LBT failures | discussion | Fujitsu | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913295 | Routing details in IAB |
discussion revision of R2-1909896 |
Sony Europe B.V. | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |
R2-1913296 | Summary of email discussion [107#31][NR/DCCA] MCG fast recovery | discussion | Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
noted | [WTS] [JSN] | |
R2-1913297 | Handling of AS-Config in HandoverPreparationInformation |
CR revised to R2-1915353 |
Ericsson | 38.331 15.7.0 CR#1300 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
agreed | [WTS] [JSN] |
R2-1913298 | Corrections on scg-RB-Config in CG-Config |
CR revised to R2-1915354 |
Ericsson | 38.331 15.7.0 CR#1301 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
agreed | [WTS] [JSN] |
R2-1913299 | Correction on candidateCellInfoListSN-EUTRA in HandoverPreparationInformation | CR | Ericsson | 38.331 15.7.0 CR#1302 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
merged | [WTS] [JSN] |
R2-1913300 | Corrections to power limitations in NE-DC |
CR revised to R2-1914190 |
Ericsson | 38.331 15.7.0 CR#1303 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
revised | [WTS] [JSN] |
R2-1913301 | Correction of SRB3 handling at full configuration (Alt1) | CR | Ericsson | 38.331 15.7.0 CR#1304 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
not treated | [WTS] [JSN] |
R2-1913302 | Correction on MCG measurements in SCGFailureInformation |
CR revised to R2-1915363 |
Ericsson | 38.331 15.7.0 CR#1305 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.3 |
not treated | [WTS] [JSN] |
R2-1913303 | Correction on SCGFailureInformation |
CR revised to R2-1915364 |
Ericsson | 38.331 15.7.0 CR#1306 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.3 |
not treated | [WTS] [JSN] |
R2-1913304 | Remaining issues for correction on the condition of RBTermChange |
CR revised to R2-1914123 |
Ericsson | 38.331 15.7.0 CR#1307 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.2 |
revised | [WTS] [JSN] |
R2-1913305 | Remaining issues for correction on the condition of RBTermChange | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.2 |
not treated | [WTS] [JSN] | |
R2-1913306 | Correction of SRB3 handling at full configuration (Alt2) |
CR revised to R2-1914172 |
Ericsson | 38.331 15.7.0 CR#1308 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
revised | [WTS] [JSN] |
R2-1913307 | Miscellaneous correction for late drop |
CR revised to R2-1914173 |
Ericsson | 36.331 15.7.0 CR#4117 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
revised | [WTS] [JSN] |
R2-1913308 | Correction to connection resume in EN-DC | CR | Ericsson | 36.331 15.7.0 CR#4118 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
not pursued | [WTS] [JSN] |
R2-1913309 | Correction to power limitations in (NG)EN-DC |
CR revised to R2-1914167 |
Ericsson | 36.331 15.7.0 CR#4119 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
revised | [WTS] [JSN] |
R2-1913310 | Correction to integrity protection in DRB addition and modification |
CR revised to R2-1915362 |
Ericsson | 38.331 15.7.0 CR#1309 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
agreed | [WTS] [JSN] |
R2-1913311 | Correction on handover terminology | CR | Ericsson | 38.321 15.7.0 CR#669 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.3.1 |
not pursued | [WTS] [JSN] |
R2-1913312 | Correction on sending Failure Information via SRB3 |
CR revised to R2-1913980 |
Ericsson, ZTE Corporation (Rapporteur) | 37.34 15.7.0 CR#159 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
revised | [WTS] [JSN] |
R2-1913313 | Correction on inter-node messages from CU to DU | CR | Ericsson | 38.331 15.7.0 CR#1310 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
not pursued | [WTS] [JSN] |
R2-1913314 | Correction to SIB5 acquisition for idle mode measurements |
CR revised to R2-1913984 |
Ericsson | 36.331 15.7.0 CR#4120 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-107 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1913315 | Correction on inter-frequency neighbour cell measurements |
CR revised to R2-1913985 |
Ericsson | 36.3 15.7.0 CR#1252 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-107 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1913316 | Summary of email discussion [107#42][NR-Rel-16] On demand SI in connected | report | Ericsson | TEI16 | Rel-16 |
R2-107 AI: 6.21 |
noted | [WTS] [JSN] | |
R2-1913317 | Running CR on on-demand SI procedure in RRC_CONNECTED |
draftCR revised to R2-1913945 |
Ericsson | TEI16 | Rel-16 |
R2-107 AI: 6.21 |
revised | [WTS] [JSN] | |
R2-1913318 | Remaining issues regarding on-demand SI for Positioning | discussion | Ericsson | TEI16 | Rel-16 |
R2-107 AI: 6.21 |
not treated | [WTS] [JSN] | |
R2-1913319 | Inter-node resource coordination in NR SL |
discussion revised to R2-1915377 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |
R2-1913320 | Discussion on NR SL QoS management | discussion | Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1913321 | Discussion on SL link management | discussion | Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913322 | Discussion on SL cross-RAT scheduling and configurations | discussion | Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.7 |
not treated | [WTS] [JSN] | |
R2-1913323 | Discussion on SL Mode 2 left issues |
discussion revised to R2-1915378 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.4 |
not treated | [WTS] [JSN] | |
R2-1913324 | Discussion on SL information reporting over Uu |
discussion revised to R2-1915379 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913325 | Discussion on SL mode 1 left issues | discussion | Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913326 | Remaining issues on UL-SL prioritisation | discussion | Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1913327 | Support on HARQ procedure over sidelink | discussion | Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913328 | Summary of email discussion [107#75][NR/V2X] RLF | discussion | Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
noted | [WTS] [JSN] | |
R2-1913329 | Remaining issues on RLC AM and UM support in SL | discussion | Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1913330 | Discussion on NR SL lower layer procedures | discussion | Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1913331 | Running CR for 38.322 for NR V2X |
draftCR revised to R2-1914113 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1913332 | Discussion on SL AS configuration request over NR Uu |
discussion revision of R2-1910132 revised to R2-1915381 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913333 | Handling of capability transfer in sidelink |
discussion revision of R2-1910134 revised to R2-1915382 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913334 | Handling of SL in Uu RRC state transitions |
discussion revision of R2-1910135 revised to R2-1915383 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913335 | Left issues on random access procedure in NTN | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913336 | Discussion on DRX operation in NTN | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913337 | Discussion on UL scheduling enhancement in NTN | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913338 | Impacts of disabling HARQ on LCP | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913339 | Discussion on handover procedure for NTN | discussion | OPPO | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913340 | Considerations on performing and criteria of measurement relaxation | discussion | LG Electronics | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913341 | Considerations on reporting measurement relaxation upon access |
discussion revised to R2-1913940 |
LG Electronics | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
revised | [WTS] [JSN] | |
R2-1913342 | Handling early meaurment results upon cell reselection | discussion | LG Electronics | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1913343 | Validity area enhancements in NR | discussion | LG Electronics | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1913344 | Considerations on ways to provide SSB configuration in early measurements | discussion | LG Electronics | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1913345 | Report of email discussion [107#64][NTN] Cell selection&reselection |
pCR revised to R2-1913953 |
LG Electronics | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
revised | [WTS] [JSN] |
R2-1913346 | Considerations on CHO in NTN | discussion | LG Electronics | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913347 | Dual connectivity use cases in NTN | discussion | LG Electronics | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913348 | Remaining issues of tracking area management in NTN | discussion | LG Electronics | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913349 | TA update after PUR transmission via MAC CE | discussion | Sequans Communications | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913350 | IAB System information handling |
discussion revision of R2-1909897 |
Sony | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5 |
not treated | [WTS] [JSN] | |
R2-1913351 | BSR enhancement for IAB |
discussion revision of R2-1909898 |
Sony | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1913352 | Handling a deprioritized PDU for uplink Intra-UE prioritization in IIoT | discussion | Sony | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1913353 | Consideration on activation/deactivation for CG Type 1 |
discussion revision of R2-1909911 revised to R2-1915229 |
Sony | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913354 | Location report in NTN |
discussion revision of R2-1909903 revised to R2-1915230 |
Sony | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913355 | Bulk handover signalling for mobility enhancement in NTN |
discussion revision of R2-1909908 |
Sony | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913356 | Fallback to 4-step RACH with BI | discussion | Sony | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |
R2-1913357 | HARQ support for MsgB of 2-Step RACH | discussion | Sony | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1913358 | Power Saving techniques, UE assistance information |
discussion revision of R2-1909907 revised to R2-1915232 |
Sony | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.5 |
not treated | [WTS] [JSN] | |
R2-1913359 | UE power saving for inter frequency measurements | discussion | Sony | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913360 | Relaxed monitoring for beam measurement | discussion | Sony | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913361 | Details of Relaxed monitoring for NR UE power saving | discussion | Sony | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913362 | On supporting UE-group wake-up signal for MTC/NB-IoT |
discussion revision of R2-1909910 |
Sony | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.3 |
not treated | [WTS] [JSN] | |
R2-1913363 | Cell selection/reselection with NPN cells | discussion | Sony | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |
R2-1913364 | Mobility enhancements for Connectivity to 5GC for MTC and NB-IoT |
discussion revised to R2-1915237 |
Sony | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.10.1 |
not treated | [WTS] [JSN] | |
R2-1913365 | Discussion on RAT dependent NR Positioning techniques | discussion | Sony | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | |
R2-1913366 | Differentiating between MSG2 and MSGB | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | ||
R2-1913367 | Remaining Stage 2 issues for 2-step RACH | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-107 AI: 6.13.2 |
noted | [WTS] [JSN] | ||
R2-1913368 | Support of CFRA with 2-step RACH | discussion | ZTE Corporation, Sanechips, Qualcomm, Fujitsu | Rel-16 |
R2-107 AI: 6.13.6 |
noted | [WTS] [JSN] | ||
R2-1913369 | Configuration aspects of 2-step RACH | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-107 AI: 6.13.4 |
not treated | [WTS] [JSN] | ||
R2-1913370 | Running MAC CR for 2-step RACH | draftCR | ZTE Corporation (email rapporteur) | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.1 |
not treated | [WTS] [JSN] | |
R2-1913371 | RAR MAC PDU design for NR-U | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913372 | Multiple Msg1 transmission opportunities for NR-U | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913373 | Discussion on configured grant for NR-U | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-107 AI: 6.2.2.5 |
not treated | [WTS] [JSN] | ||
R2-1913374 | Considerations on camping on non-best cell | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | ||
R2-1913375 | Recovery from consistent LBT failures | discussion | ZTE Corporation, Sanechips | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1913376 | Report on [107#74] QoS flow in SLRB | discussion | Apple | FS_NR_V2X | Rel-16 |
R2-107 AI: 6.4.6 |
noted | [WTS] [JSN] | |
R2-1913377 | Discussion on QoS flow in SLRB |
discussion revised to R2-1914176 |
Apple | FS_NR_V2X | Rel-16 |
R2-107 AI: 6.4.6 |
revised | [WTS] [JSN] | |
R2-1913378 | PC5 RRC procedure | discussion | Apple | FS_NR_V2X | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913379 | Maximum Data Rate Enumeration for UP Integrity Protection | discussion | Apple, ZTE Corporation, Sanechips | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913380 | Draft LS on Maximum Data Rate Enumeration for UP Integrity Protection |
LS out LS To: CT1 |
Apple | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913381 | SI Acquisition in Connected Mode | discussion | Apple | TEI16 | Rel-16 |
R2-107 AI: 6.21 |
not treated | [WTS] [JSN] | |
R2-1913382 | CMAS/ETWS Reception at UE Configured with eDRX | discussion | Apple | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
noted | [WTS] [JSN] | |
R2-1913383 | Handling of fallbacks for combined contiguous and non-contiguous CA in FR2 |
discussion revised to R2-1913974 |
Apple | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
revised | [WTS] [JSN] | |
R2-1913384 | CR to TS38.306 on FR2 intra band contiguous and non-contiguous CA fallback | CR | Apple | 38.306 15.7.0 CR#181 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1913385 | Full configuration in inter-RAT handover | CR | Google Inc. | 38.331 15.7.0 CR#1311 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] |
R2-1913386 | Full configuration in inter-RAT handover |
CR revised to R2-1915637 |
Google Inc. | 36.331 15.7.0 CR#4121 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
not treated | [WTS] [JSN] |
R2-1913387 | Baseline NTN-TN service continuity and mobility mechanism | discussion | HUGHES Network Systems Ltd | Rel-16 |
R2-107 AI: 6.6.4.1 |
reserved | [WTS] [JSN] | ||
R2-1913388 | Discussion on LCP procedure for NTN |
discussion revision of R2-1911286 |
Nokia, Nokia Shanghai Bell | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913389 | Introduction of voice fallback indication |
CR revised to R2-1915033 |
Qualcomm Incorporated, T-Mobile USA, Verizon, China Telecom, Softbank, Ericsson | 38.331 15.7.0 CR#1312 catC | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913390 | Introduction of voice fallback indication |
CR revised to R2-1915034 |
Qualcomm Incorporated, T-Mobile USA, Verizon, China Telecom, Softbank, Ericsson | 36.331 15.7.0 CR#4136 catC | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913391 | Draft LS on RRC establishment cause value in EPS fallback |
LS out LS To: CT1 |
Qualcomm Incorporated | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913392 | CLI measurements UE capabilities | discussion | Qualcomm Incorporated | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] | |
R2-1913393 | Too strong interference during CLI-RSSI/SRS-RSRP measurement |
discussion revised to R2-1915714 |
Qualcomm Incorporated | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] | |
R2-1913394 | ARFCN used for security key derivation | discussion | Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.8 |
noted | [WTS] [JSN] | |
R2-1913395 | DL and UL NR Positioning Procedures | discussion | Qualcomm Incorporated |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | |||
R2-1913396 | TP for 38.305 Baseline CR: Transmission Measurement Function in NG-RAN | discussion | Qualcomm Incorporated |
R2-107 AI: 6.8.1 |
noted | [WTS] [JSN] | |||
R2-1913397 | GNSS SSR Assistance Data | discussion | Qualcomm Incorporated |
R2-107 AI: 6.8.2.2 |
not treated | [WTS] [JSN] | |||
R2-1913398 | Broadcast of Location Assistance Data by NG-RAN | discussion | Qualcomm Incorporated |
R2-107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |||
R2-1913399 | Assistance Data for DL-only UE-based mode | discussion | Qualcomm Incorporated |
R2-107 AI: 6.8.2.4 |
not treated | [WTS] [JSN] | |||
R2-1913400 | Running CR for Introduction of Even futher Mobility enhancement in E-UTRAN | draftCR | Ericsson India Private Limited | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.1 |
not treated | [WTS] [JSN] | |
R2-1913401 | Discussion on HARQ feedback for msgB and RNTI design for msgB | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1913402 | Prioritized 2-step RACH | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1913403 | Report of email discussion [107#68] [NR/2-step RACH]: MAC PDU format for msgB | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.3 |
noted | [WTS] [JSN] | |
R2-1913404 | msgB MAC PDU format | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |
R2-1913405 | Remaining issue on contention resolution and fall back procedure | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | |
R2-1913406 | [107#61][NR/NTN] Rapporteur Running TP |
pCR revised to R2-1913969 |
THALES | 38.821 0.7.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.1 |
revised | [WTS] [JSN] |
R2-1913407 | Enhanced TCI States Activation/Deactivation PDSCH MAC CE for Multi-TRP |
discussion revision of R2-1911375 revised to R2-1916066 |
Qualcomm Incorporated | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | |
R2-1913408 | Use case and Signaling for RSS | discussion | Ericsson | Rel-16 |
R2-107 AI: 7.1. |
not treated | [WTS] [JSN] | ||
R2-1913409 | NRS Signalling Configuration | discussion | Ericsson | Rel-16 |
R2-107 AI: 7.2.7 |
not treated | [WTS] [JSN] | ||
R2-1913410 | New SIB for hosting posSI Scheduling Information | discussion | Ericsson | Rel-16 |
R2-107 AI: 6.8.2.3 |
not treated | [WTS] [JSN] | ||
R2-1913411 | Specify UDC Header is part of Data Field | CR | Ericsson | 36.323 15.4.0 CR#276 catF | LTE_UDC-Core | Rel-15 |
R2-107 AI: 4.5 |
postponed | [WTS] [JSN] |
R2-1913412 | Running CR for the introduction of NR positioning |
draftCR revised to R2-1915690 |
Ericsson | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.1 |
not treated | [WTS] [JSN] | |
R2-1913413 | Quality Report in eMTC Remaining Issues | discussion | Ericsson | Rel-16 |
R2-107 AI: 7.1.6 |
not treated | [WTS] [JSN] | ||
R2-1913414 | Text Proposal for MAC specification on Quality Report | discussion | Ericsson | Rel-16 |
R2-107 AI: 7.1.6 |
not treated | [WTS] [JSN] | ||
R2-1913415 | Introduction of additional posSIBs for QZSS PPP-RTK Phase 2 | draftCR | Ericsson | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.1 |
not treated | [WTS] [JSN] | |
R2-1913416 | UE-based configuration options | discussion | Ericsson | Rel-16 |
R2-107 AI: 6.8.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913417 | S-Criterion for Non anchor Carrier based NRS measurements | discussion | Ericsson | Rel-16 |
R2-107 AI: 7.2.7 |
not treated | [WTS] [JSN] | ||
R2-1913418 | RSS Signalling Configuration | discussion | Ericsson | Rel-16 |
R2-107 AI: 7.1. |
not treated | [WTS] [JSN] | ||
R2-1913419 | Remaining Issues for ANR measurements | discussion | Ericsson | Rel-16 |
R2-107 AI: 7.2.6 |
noted | [WTS] [JSN] | ||
R2-1913420 | posSIBs on a selective carrier | discussion | Ericsson | Rel-16 |
R2-107 AI: 4.4 |
noted | [WTS] [JSN] | ||
R2-1913421 | PosSIB Broadcast carrier | CR | Ericsson | 36.331 15.7.0 CR#4122 catC | LCS_LTE_acc_enh-Core | Rel-15 |
R2-107 AI: 4.4 |
not treated | [WTS] [JSN] |
R2-1913422 | Stage-3 structure details for RAT-dependent NR positioning | discussion | Ericsson | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913423 | RAT dependent positioning methods - architecture and protocol aspects | discussion | Ericsson | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913424 | GNSS Integer Ambiguity Level Indications | discussion | Ericsson | Rel-16 |
R2-107 AI: 6.8.2.2 |
not treated | [WTS] [JSN] | ||
R2-1913425 | Corrections for Positioning Architecture |
CR revised to R2-1914072 |
Ericsson | 38.305 15.4.0 CR#15 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.3 |
revised | [WTS] [JSN] |
R2-1913426 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC |
other revised to R2-1914092 |
Document Rapporteur (BlackBerry) | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R2-1913427 | CR to 38.331 on SSB-ToMeasure clarifications | CR | Ericsson | 38.331 15.7.0 CR#1313 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not treated | [WTS] [JSN] |
R2-1913428 | CR to 36.331 on SSB-ToMeasure clarifications | CR | Ericsson | 36.331 15.7.0 CR#4123 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not treated | [WTS] [JSN] |
R2-1913429 | CR to 36.306 on FR2 related ANR capability | CR | Ericsson | 36.306 15.6.0 CR#1718 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1913430 | CR to 36.331 on FR2 related ANR capability | CR | Ericsson | 36.331 15.7.0 CR#4124 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1913431 | CR to 38.306 on FR2 related ANR capability | CR | Ericsson | 38.306 15.7.0 CR#182 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1913432 | CR to 38.331 on FR2 related ANR capability | CR | Ericsson | 38.331 15.7.0 CR#1314 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1913433 | CR to 36.331 on performing L3 filtering for NR related measurements | CR | Ericsson | 36.331 15.7.0 CR#4125 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R2-1913434 | CR to 36.331on NR CGI reporting related to cellReservedForOtherUse | CR | Ericsson | 36.331 15.7.0 CR#4126 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1913435 | CR to 38.331 on NR CGI reporting related to cellReservedForOtherUse and LTE CGI reporting related to CSG cells | CR | Ericsson | 38.331 15.7.0 CR#1315 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1913436 | CR to 38.331 on A2 event definition clarification | CR | Ericsson | 38.331 15.7.0 CR#1316 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not treated | [WTS] [JSN] |
R2-1913437 | CR to 36.331 on A2 event definition clarification | CR | Ericsson | 36.331 15.7.0 CR#4127 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not treated | [WTS] [JSN] |
R2-1913438 | Triggering conditions for A1-A6 events in NR | discussion | Ericsson | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913439 | CR to 38.331 on Triggering conditions for A1 to A6 events in NR | CR | Ericsson | 38.331 15.7.0 CR#1317 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913440 | CR to 38.306 on Triggering conditions for A1 to A6 events in NR | CR | Ericsson | 38.306 15.7.0 CR#183 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913441 | Open issues of L2 measurements in NR | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
noted | [WTS] [JSN] | |
R2-1913442 | Open issues related to RACH report | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1913443 | Open issues related to RLF report | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1913444 | Successful handover report | discussion | Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1913445 | Correction on the usage of the TCI capability | CR | Intel | 38.306 15.7.0 CR#184 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
reserved | [WTS] [JSN] |
R2-1913446 | Clarification on the restriction of maximum SRS resource sets configuration for uplink beam management. |
CR revised to R2-1914578 |
Intel | 38.306 15.7.0 CR#185 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1913447 | Miscellaneous corrections on UE capability fields |
CR revised to R2-1914193 |
Intel Corporation, NTT DoCoMo | 38.306 15.7.0 CR#186 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
revised | [WTS] [JSN] |
R2-1913448 | Discussion on some open issues in running MAC CR | discussion | Email discussion rapporteur (ZTE Corporation) |
R2-107 AI: 6.13.1 |
noted | [WTS] [JSN] | |||
R2-1913449 | Summary of running MAC CR review issue list | report | ZTE Corporation (email disc Rapporteur) |
R2-107 AI: 6.13.1 |
not treated | [WTS] [JSN] | |||
R2-1913450 | Updated Work Plan for NR Industrial IoT WI | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.1 |
not treated | [WTS] [JSN] | |
R2-1913451 | Remaining issues for accurate reference time delivery | discussion | Nokia, Nokia Shanghai Bell, NTT DOCOMO | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |
R2-1913452 | Periodicity and burst arrival encoding in TSCAI |
discussion revised to R2-1913934 |
Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.3 |
revised | [WTS] [JSN] | |
R2-1913453 | Support for arbitrary TSC message periodicities | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
noted | [WTS] [JSN] | |
R2-1913454 | CG and SPS occasions determination for new periodicities | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913455 | SPS collisions with multiple SPS configurations |
discussion revision of R2-1909491 |
Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913456 | Padding removal | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |
R2-1913457 | Joint IP and Ethernet Header compression | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |
R2-1913458 | LCP restrictions enhancements | discussion | Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
noted | [WTS] [JSN] | |
R2-1913459 | Route priority and local routing | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |
R2-1913460 | BH link failure handling | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |
R2-1913461 | IAB initial access and IAB support indication | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.2 |
not treated | [WTS] [JSN] | |
R2-1913462 | Routing and mapping configuration in IAB nodes | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.2 |
not treated | [WTS] [JSN] | |
R2-1913463 | IAB-MT terminology | discussion | Nokia, Nokia Shanghai Bell, Vodafone | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
noted | [WTS] [JSN] | |
R2-1913464 | Admission control for IAB | discussion | Nokia, Nokia Shanghai Bell | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.3 |
reserved | [WTS] [JSN] | |
R2-1913465 | Revisions of usage scenarios for NTN | pCR | THALES | 38.821 0.7.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.2 |
reserved | [WTS] [JSN] |
R2-1913466 | SSB-ToMeasure related clarification | discussion | Ericsson LM | Rel-15 |
R2-107 AI: 5.4.1.4 |
not treated | [WTS] [JSN] | ||
R2-1913467 | On Layer 2 parameter values to support delay critical GBR QoS flows | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.3 |
not treated | [WTS] [JSN] | ||
R2-1913468 | Solutions to mitigate the periodicity misalignment between TSC traffic and CG/SPS | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-107 AI: 6.7.2.2 |
not treated | [WTS] [JSN] | ||
R2-1913469 | Remaining issues of LCP enhancement for TSC traffic | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1913470 | Propagation delay compensation for accurate reference timing |
discussion revised to R2-1913962 |
Huawei, HiSilicon | NR_IIOT-Core |
R2-107 AI: 6.7.2.1 |
revised | [WTS] [JSN] | ||
R2-1913471 | Remaining issues of reference time delivery |
discussion revised to R2-1913963 |
Huawei, HiSilicon | NR_IIOT-Core |
R2-107 AI: 6.7.2.1 |
revised | [WTS] [JSN] | ||
R2-1913472 | Further discussion on Configured Grant Confirmation MAC CE | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-107 AI: 6.7.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913473 | Discussion on EHC header format | discussion | Huawei, HiSilicon | NR_IIOT-Core |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | ||
R2-1913474 | Paging for NR-U | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-107 AI: 6.2.3.1 |
not treated | [WTS] [JSN] | ||
R2-1913475 | SI enhancement for NR-U | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-107 AI: 6.2.3.5 |
not treated | [WTS] [JSN] | ||
R2-1913476 | Discussion on multiplexing of data | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-107 AI: 6.2.2.6 |
not treated | [WTS] [JSN] | ||
R2-1913477 | Discussion on DL LBT failure impact on RLF triggering | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-107 AI: 6.2.3.4 |
not treated | [WTS] [JSN] | ||
R2-1913478 | Further discussion on PLMN selection for NR-U | discussion | Huawei, HiSilicon | NR_unlic-Core |
R2-107 AI: 6.2.3.2 |
noted | [WTS] [JSN] | ||
R2-1913479 | Consistent LBT failure detection | discussion | Google Inc. | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | ||
R2-1913480 | CAPC for configured grants in NR-U |
discussion revision of R2-1910689 revised to R2-1915803 |
Google Inc. | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.6 |
not treated | [WTS] [JSN] | |
R2-1913481 | Correction to RRCReconfigurationComplete in NR-DC | CR | Ericsson | 38.331 15.7.0 CR#1318 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
withdrawn | [WTS] [JSN] |
R2-1913482 | Clarification on security key change and bearer termination point change |
CR revised to R2-1914811 |
ZTE Corporation, Ericsson, Intel | 37.34 15.7.0 CR#160 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1913483 | Further issues for CHO configuration and execution | discussion | ZTE Corporation, Sanechips | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1913484 | Discussion on fast RLF recovery when applying CHO and fast MCG recovery | discussion | ZTE Corporation, Sanechips | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |
R2-1913485 | Discussion on conditional PSCell addition/change | discussion | ZTE Corporation, Sanechips | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1913486 | Discussion on capability coordination for RUDI HO | discussion | ZTE Corporation, Sanechips | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913487 | Remaining Issues on Early Measurements | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1913488 | On Inter-RAT Operation | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1913489 | On directly donfiguring SCell as activated | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.1 |
not treated | [WTS] [JSN] | |
R2-1913490 | Further Consideration on fast SCell activation | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |
R2-1913491 | On SCG suspension | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |
R2-1913492 | Signalling overhead reduction for cell configuration and BWP configuration | discussion | ZTE Corporation, Sanechips | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.4 |
not treated | [WTS] [JSN] | |
R2-1913493 | UE positioning in legacy satellite communication systems for 5G NTN |
discussion revision of R2-1908844 |
THALES | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
noted | [WTS] [JSN] | |
R2-1913494 | Discussion on SDAP protocol for NR V2X |
discussion revision of R2-1910201 |
Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913495 | Discussion on prioritization between SL BSR and UL BSR | discussion | Apple, OPPO | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913496 | Discussion on remaining issues on HARQ feedback | discussion | Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913497 | Draft LS on Support HARQ feedback design for SL groupcast |
LS out LS To: SA2 |
Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913498 | UE Mobility for Simultaneous Mode 1 & Mode 2 configuration |
discussion revised to R2-1915777 |
Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |
R2-1913499 | Resource allocations for UEs with simultaneous mode 1 & mode 2 configurations |
discussion revised to R2-1915778 |
Apple | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |
R2-1913500 | Improved transmission mechanism for PUCCH-UCI | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | |
R2-1913501 | Discussions on configured grant in NR-U | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.5 |
noted | [WTS] [JSN] | |
R2-1913502 | Further discussions on channel access priority | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.6 |
not treated | [WTS] [JSN] | |
R2-1913503 | DRX enhancement for NR-U | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.4 |
not treated | [WTS] [JSN] | |
R2-1913504 | Handling LBT failures | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913505 | RACH enhancements for NR-U | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913506 | RAN2 impact of supporting wideband operation | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | |
R2-1913507 | Channel access for Msg3 | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913508 | 2-step Random Access for NR-U | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.3 |
not treated | [WTS] [JSN] | |
R2-1913509 | Running MAC CR for NR-U | discussion | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R2-1913510 | PC5-RRC and PC5-S interactions and their security in NR V2X |
discussion revision of R2-1910831 revised to R2-1916149 |
Qualcomm Incorporated | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913511 | Discussion on mode 1 resource allocation |
discussion revision of R2-1910890 |
Qualcomm Incorporated | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913512 | Inter-RAT resource allocation in NR V2X |
discussion revision of R2-1910888 |
Qualcomm Incorporated | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913513 | Timing of Key Derivation in Conditional Handover | discussion | Futurewei | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1913514 | Draft LS on the Timing of AS Key Derivation in Conditional Handover |
LS out LS To: SA3 |
Futurewei | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1913515 | Handling of Key Derivation in Conditional PSCell Addition/Change | discussion | Futurewei | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1913516 | Correction to secondary key derivation | CR | Ericsson | 38.331 15.7.0 CR#1319 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.8 |
not pursued | [WTS] [JSN] |
R2-1913517 | Miscellaneous corrections to 38.306 | CR | Ericsson | 38.306 15.7.0 CR#187 catB | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
merged | [WTS] [JSN] |
R2-1913518 | Correction to field conditions in NE-DC |
CR revised to R2-1914124 |
Ericsson | 36.331 15.7.0 CR#4128 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
revised | [WTS] [JSN] |
R2-1913519 | Addition of dynamic power sharing for NE-DC (38.306) | CR | Ericsson | 38.306 15.7.0 CR#188 catB | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
not pursued | [WTS] [JSN] |
R2-1913520 | Addition of dynamic power sharing for NE-DC | discussion | Ericsson |
R2-107 AI: 5.5.2 |
noted | [WTS] [JSN] | |||
R2-1913521 | Clarification to radio bearer handling for intra-5GC HO from LTE to NR (38.331) | CR | Ericsson | 38.331 15.7.0 CR#1320 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
postponed | [WTS] [JSN] |
R2-1913522 | Clarification to radio bearer handling for intra-5GC HO from NR to LTE (36.331) | CR | Ericsson | 36.331 15.7.0 CR#4129 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
postponed | [WTS] [JSN] |
R2-1913523 | Correction on capability coordination terminology (37.340) | CR | Ericsson | 37.34 15.7.0 CR#161 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
not pursued | [WTS] [JSN] |
R2-1913524 | Correction to Feature Set Combinations for NR-DC (38.331) | CR | Ericsson | 38.331 15.7.0 CR#1321 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1913525 | Handling of fallback band combinations | discussion | Ericsson, NTT DOCOMO |
R2-107 AI: 5.4.4 |
not treated | [WTS] [JSN] | |||
R2-1913526 | [DRAFT] Reply LS on Handling of Fallbacks for combined contiguous and non-contiguous CA or DC configurations in FR2 |
LS out LS To: RAN WG4 |
Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not treated | [WTS] [JSN] | |
R2-1913527 | Introducing multiple BC-FS | CR | Ericsson | 38.331 15.7.0 CR#1322 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913528 | Returning multiple BC+FS in CG-Config | discussion | Ericsson |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |||
R2-1913529 | Overheating enhancements for EN-DC | discussion | Ericsson |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |||
R2-1913530 | Use of group signaling for NR-CA | discussion | Ericsson |
R2-107 AI: 6.10.4.4 |
not treated | [WTS] [JSN] | |||
R2-1913531 | Further RRC impact due to dormancy behaviour | discussion | Ericsson |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |||
R2-1913532 | Email Discussion [107#27][NR/R15] Determining L2 buffer size (Ericsson) | discussion | Ericsson |
R2-107 AI: 5.4.1.9 |
noted | [WTS] [JSN] | |||
R2-1913533 | LS on NR V2X synchronization procedures and priority (R1-1909910; contact: CATT) |
LS in source LS: R1-1909910 LS To: RAN2, RAN4 |
RAN1 | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
noted | [WTS] [JSN] | |
R2-1913534 | Clarification on satellite beam and PCI mapping | discussion | THALES | Rel-16 |
R2-107 AI: 6.6.4 |
withdrawn | [WTS] [JSN] | ||
R2-1913535 | Draft CR on CLI for TS 38.306 |
draftCR revised to R2-1915716 |
Ericsson(rapporteur) | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
endorsed | [WTS] [JSN] | |
R2-1913536 | Remaining issues on CLI | discussion | Ericsson | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] | |
R2-1913537 | On s measure for CLI | discussion | Ericsson | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] | |
R2-1913538 | Open Issues for IAB Routing |
discussion revision of R2-1910904 revised to R2-1914514 |
Futurewei Technologies |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |||
R2-1913539 | Enhancements for low-latency IAB Uplink scheduling |
discussion revision of R2-1911438 revised to R2-1914768 |
Futurewei Technologies |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |||
R2-1913540 | Miscellaneous non-controversial corrections Set IV |
CR revised to R2-1915671 |
Ericsson | 38.331 15.7.0 CR#1323 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
postponed | [WTS] [JSN] |
R2-1913541 | Definition of NR standalone |
CR revised to R2-1914139 |
Ericsson | 38.331 15.7.0 CR#1324 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
revised | [WTS] [JSN] |
R2-1913542 | Presence and absence of TAC in NR cell |
CR revised to R2-1914127 |
Ericsson | 38.331 15.7.0 CR#1325 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.6 |
revised | [WTS] [JSN] |
R2-1913543 | On Scell AddMod and Release lists | discussion | Ericsson | LTE_CA_enh_b5C-Core | Rel-13 |
R2-107 AI: 4.5 |
noted | [WTS] [JSN] | |
R2-1913544 | Backhaul RLF Notification and Recovery Procedure |
discussion revision of R2-1911066 revised to R2-1916061 |
Futurewei Technologies |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |||
R2-1913545 | Logged MDT for RRC_INACTIVE state | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913546 | Logged MDT configuration events |
discussion revised to R2-1915618 |
Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913547 | Impact of SNPN on PLMN check for MDT | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913548 | RACH Scenarios and their presence in the RACH Report | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1913549 | RACH Fallback from NUL to SUL | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1913550 | TP to 38.300 on SON support | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1913551 | Counting number of inactive Ues | discussion | Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | |
R2-1913552 | Measurement event for interference-forced inter-RAT/inter-freq HO |
discussion revised to R2-1915622 |
Nokia, Nokia Shanghai Bell | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.5 |
not treated | [WTS] [JSN] | |
R2-1913553 | Clarification on RA and Msg3 with PUSCH Enhancements |
CR revision of R2-1910720 revised to R2-1913981 |
Nokia, Nokia Shanghai Bell | 36.321 14.11.0 CR#14562 catF | LTE_VoLTE_ViLTE_enh | Rel-14 |
R2-107 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1913554 | Clarification on RA and Msg3 with PUSCH Enhancements |
CR revision of R2-1910721 revised to R2-1913982 |
Nokia, Nokia Shanghai Bell | 36.321 15.7.0 CR#14571 catA | LTE_VoLTE_ViLTE_enh | Rel-15 |
R2-107 AI: 4.5 |
revised | [WTS] [JSN] |
R2-1913555 | MAC Scheduling Aspects of Multi-TTI Grant | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | |||
R2-1913556 | Impact of ACK/NACK transmission to NR-U DRX | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.2.4 |
noted | [WTS] [JSN] | |||
R2-1913557 | Report for [107#51][NR IAB] F1 over LTE (AT&T) | discussion | AT&T | Rel-16 |
R2-107 AI: 6.1.2 |
noted | [WTS] [JSN] | ||
R2-1913558 | Impact of non-Numeric K1 Value to NR-U DRX |
discussion revised to R2-1913951 |
Qualcomm Incorporated |
R2-107 AI: 6.2.2.4 |
revised | [WTS] [JSN] | |||
R2-1913559 | Paging monitoring in NR-U | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.3.1 |
noted | [WTS] [JSN] | |||
R2-1913560 | Remaining FFS on cell reselection for NR-U | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |||
R2-1913561 | DRX Active Time for NR-U | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.2.4 |
not treated | [WTS] [JSN] | |||
R2-1913562 | CAPC and uplink transmission | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.2.6 |
noted | [WTS] [JSN] | |||
R2-1913563 | Clarification on satellite beam and PCI mapping |
pCR revision of R2-1908843 revised to R2-1914055 |
THALES, ERICSSON | 38.821 0.7.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4 |
revised | [WTS] [JSN] |
R2-1913564 | On SL HARQ configuration for NR V2X | discussion | Intel Corporation | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1913565 | Correction to Pcompensation for FR2 | CR | Huawei, HiSilicon | 36.304 15.4.0 CR#773 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
withdrawn | [WTS] [JSN] |
R2-1913566 | Correction to the parameter descriptions for cell measurement quallity derivation in multi-beam operation | CR | Huawei, HiSilicon | 36.304 15.4.0 CR#774 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
not treated | [WTS] [JSN] |
R2-1913567 | Correction to the field description of cellReselectionInfoCommon for cell measurement quallity derivation in multi-beam operation | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4130 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
not treated | [WTS] [JSN] |
R2-1913568 | Remaining issues on time domain measurement relaxation | discussion | Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913569 | Reducing the number of neighbour cells/carriers to measure |
discussion revised to R2-1915530 |
Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913570 | Remaining issues of DL quality report | discussion | Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-107 AI: 7.1.6 |
noted | [WTS] [JSN] | |
R2-1913571 | MPDCCH performance improvement using CRS |
discussion revision of R2-1910064 |
Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-107 AI: 7.1.7 |
noted | [WTS] [JSN] | |
R2-1913572 | Enhancements to idle mode mobility for non-BL UEs | discussion | Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-107 AI: 7.1.8 |
noted | [WTS] [JSN] | |
R2-1913573 | Use of RSS for measurement improvements | discussion | Huawei, HiSilicon | LTE_eMTC4-Core | Rel-16 |
R2-107 AI: 7.1. |
not treated | [WTS] [JSN] | |
R2-1913574 | NR-U specific aspects for 2-step RACH | discussion | Qualcomm Incorporated |
R2-107 AI: 6.2.2.3 |
not treated | [WTS] [JSN] | |||
R2-1913575 | Running RRC CR for NR-based Access to Unlicensed Spectrum |
draftCR revised to R2-1914001 |
Qualcomm Incorporated | NR_unlic-Core | Rel-15 |
R2-107 AI: 6.2.1 |
revised | [WTS] [JSN] | |
R2-1913576 | Running Idle/Inactive mode CR for NR-based Access to Unlicensed Spectrum |
draftCR revised to R2-1914003 |
Qualcomm Incorporated | NR_unlic-Core | Rel-15 |
R2-107 AI: 6.2.1 |
revised | [WTS] [JSN] | |
R2-1913577 | Clarification on SRB3 usage | CR | ZTE Corporation | 38.331 15.7.0 CR#1326 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
not treated | [WTS] [JSN] |
R2-1913578 | Correction of RRC procedure upon expiry of DataInactivityTimer | CR | Qualcomm Incorporated | 38.331 15.7.0 CR#1327 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
not pursued | [WTS] [JSN] |
R2-1913579 | Draft LS on RRC indication to NAS upon expiry of DataInactivityTimer |
LS out LS To: CT1 |
Qualcomm Incorporated |
R2-107 AI: 5.4.1.3.11 |
not treated | [WTS] [JSN] | |||
R2-1913580 | Methods of Paging in GEO Satellite-Based 5G Networks | discussion | HUGHES Network Systems Ltd | Rel-16 |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1913581 | On uplink enhancements for NTN | discussion | Ericsson | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913582 | DRX adaptions for NTN | discussion | Ericsson | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913583 | Remaining aspects on Random access for NTN | discussion | Ericsson | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913584 | Remaining aspects on RLC and PDCP | discussion | Ericsson | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.2 |
not treated | [WTS] [JSN] | |
R2-1913585 | Satellite identifier in 3GPP NTN Control Plane |
discussion revision of R2-1908843 |
THALES | Rel-16 |
R2-107 AI: 6.6.4 |
noted | [WTS] [JSN] | ||
R2-1913586 | Remaining issues regarding UE assistance information | discussion | Samsung, Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
noted | [WTS] [JSN] | |
R2-1913587 | Correction of UE assistance information | draftCR | Samsung, Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
not treated | [WTS] [JSN] | |
R2-1913588 | Correction of UE assistance information |
draftCR revised to R2-1914161, R2-1915708 |
Samsung, Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
revised | [WTS] [JSN] | |
R2-1913589 | Clarification regarding QoS handling in MRDC with 5G CN |
draftCR revised to R2-1914121, R2-1915709 |
Samsung, ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
revised | [WTS] [JSN] | |
R2-1913590 | CHO configuration/ execution, remaining aspects | discussion | Samsung Telecommunications | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1913591 | Introducing condition for SN (re-)configurations | discussion | Samsung Telecommunications | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1913592 | Capability coordination for DAPS, required UE capability details and signalling | discussion | Samsung Telecommunications | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913593 | Angle of Departure UE positioning technique |
discussion revised to R2-1916105 |
Nokia, Nokia Shanghai Bell | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | |
R2-1913594 | On-demand and dynamic PRS configuration for DL-TDOA |
discussion revision of R2-1907657 |
Nokia, Nokia Shanghai Bell | NR_pos-Core | Rel-16 |
R2-107 AI: 6.8.2.1 |
not treated | [WTS] [JSN] | |
R2-1913595 | PC5 groupcast handling |
discussion revised to R2-1916108 |
Qualcomm Incorporated | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1913596 | RRC Framework for handling MN failure indication and recovery over SRB3 | discussion | Intel Corporation | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1913597 | Pre-configured UL Resources Design Considerations |
discussion revision of R2-1910896 |
Sierra Wireless, S.A., Sony Mobile Communications, Gemalto N.V. | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913598 | Recommended Bit Rate/Query for FLUS and MTSI |
discussion revised to R2-1915712 |
Qualcomm Incorporated | E_FLUS | Rel-16 |
R2-107 AI: 6.19 |
not treated | [WTS] [JSN] | |
R2-1913599 | [Draft] Reply LS on Recommended Bit Rate/Query for FLUS and MTSI |
LS out LS is reply to S4-191031 LS To: SA4 |
Qualcomm Incorporated | E_FLUS | Rel-16 |
R2-107 AI: 6.19 |
not treated | [WTS] [JSN] | |
R2-1913600 | Remaining aspects from [106#61] D-PUR Request, (re)configuration and release mechanism | discussion | Qualcomm Incorporated | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |
R2-1913601 | Introduction of Rel-16 eMTC enhancements |
draftCR revision of R2-1911607 revised to R2-1914038 |
Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
revised | [WTS] [JSN] | |
R2-1913602 | Addressing Editor's Notes and FFSes in RRC running CR | discussion | Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
noted | [WTS] [JSN] | |
R2-1913603 | Conditional measurement configuration for LEO NTN |
discussion revised to R2-1915770 |
InterDigital | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913604 | Summary of Email Discussion [107_62] TP Mobility (InterDigital) | discussion | InterDigital | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
noted | [WTS] [JSN] | |
R2-1913605 | TP on NTN Mobility Issues and Solutions |
discussion revision of R2-1910962 revised to R2-1914194 |
InterDigital | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
revised | [WTS] [JSN] | |
R2-1913606 | Further considerations for the WUS | discussion | InterDigital | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |
R2-1913607 | Discussion on the SN modification trigger | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
noted | [WTS] [JSN] | |
R2-1913608 | Draft reply LS on full configuration during SN Modification procedure |
LS out LS is reply to R2-1912033 LS To: RAN3 revised to R2-1914164 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
revised | [WTS] [JSN] | |
R2-1913609 | Further issues of not up-to-date SN configuration at handover | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
not treated | [WTS] [JSN] | |
R2-1913610 | Exchanging used IDs of SN terminated DRBs | CR | Huawei, HiSilicon | 36.331 15.7.0 CR#4131 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
not treated | [WTS] [JSN] |
R2-1913611 | Exchanging used IDs of SN terminated DRBs | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1328 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
not treated | [WTS] [JSN] |
R2-1913612 | Sending FailureInformation message on SRB3 | CR | Huawei, HiSilicon | 37.34 15.7.0 CR#162 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
not treated | [WTS] [JSN] |
R2-1913613 | Clarification on SRB3 release | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1329 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
merged | [WTS] [JSN] |
R2-1913614 | sk-counter presence in RRC(Connection)Reconfiguration | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
not treated | [WTS] [JSN] | |
R2-1913615 | Idle/inactive NR measurements in LTE and in NR | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1913616 | UE capabilities for DC and CA enhancements | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.7 |
not treated | [WTS] [JSN] | |
R2-1913617 | Handling of primaryPath when fast MCG link recovery via split SRB1 fails | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1913618 | Discussion on dormancy-like behaviour | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |
R2-1913619 | RAN2 specification impacts of multi-TRP transmission | discussion | Huawei, HiSilicon | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.3 |
not treated | [WTS] [JSN] | |
R2-1913620 | MAC CE signalling enhancement for TCI indication of single-PDCCH based multi-TRP transmission | discussion | Huawei, HiSilicon | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.2 |
not treated | [WTS] [JSN] | |
R2-1913621 | Beam failure recovery for SCell | discussion | Huawei, HiSilicon | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913622 | Configured Grant enhancements for TSC traffic |
discussion revision of R2-1911380 revised to R2-1916230 |
Sequans Communications | FS_NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
noted | [WTS] [JSN] | |
R2-1913623 | BSR operation with CA packet duplication |
discussion revision of R2-1911381 |
Sequans Communications | FS_NR_IIOT | Rel-16 |
R2-107 AI: 6.20.2 |
noted | [WTS] [JSN] | |
R2-1913624 | Handling of collisions with a CG |
discussion revision of R2-1911383 revised to R2-1916232 |
Sequans Communications | FS_NR_IIOT | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1913625 | Enhanced rescheduling for dropped CG |
discussion revision of R2-1911384 revised to R2-1916233 |
Sequans Communications | FS_NR_IIOT | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1913626 | On Inter-RAT assistance information for NB-IoT and LTE(-eMTC) |
discussion revision of R2-1911386 revised to R2-1916234 |
Sequans Communications | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.8 |
not treated | [WTS] [JSN] | |
R2-1913627 | NB-IoT UE Specific DRX Support |
discussion revised to R2-1916235 |
Sequans Communications | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.11 |
not treated | [WTS] [JSN] | |
R2-1913628 | IAB with NSA operation | discussion | Sequans Communications | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
noted | [WTS] [JSN] | |
R2-1913629 | Support for LTE deployment at IAB node sites |
discussion revision of R2-1911388 revised to R2-1916237 |
Sequans Communications | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |
R2-1913630 | F1-U Flow Control and Reordering Issues |
discussion revised to R2-1916238, R2-2001631 |
Sequans Communications | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.3 |
not treated | [WTS] [JSN] | |
R2-1913631 | Queue Management vs Flow Control for Congestion Handling |
discussion revision of R2-1911389 revised to R2-1916239, R2-2001632 |
Sequans Communications | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.3 |
not treated | [WTS] [JSN] | |
R2-1913632 | Correction for the establishment of LTE RLC bearers for (NG)EN-DC and NE-DC |
CR revised to R2-1914125 |
Huawei, HiSilicon | 36.331 15.7.0 CR#4132 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
revised | [WTS] [JSN] |
R2-1913633 | Report of email discussion [107#40][NR/NPN] SIB1 design (Qualcomm) | report | Qualcomm Incorporated |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |||
R2-1913634 | Suitable and acceptable NPN cells | discussion | Qualcomm Incorporated |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |||
R2-1913635 | Support for NPN HRNN broadcast |
discussion revised to R2-1915805 |
Qualcomm Incorporated |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | |||
R2-1913636 | [DRAFT] LS on granularity of periodicity and burst arrival time in TSCAI |
LS out LS To: RAN3 revised to R2-1914215 |
Qualcomm Incorporated | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.3 |
revised | [WTS] [JSN] | |
R2-1913637 | TSCAI Encoding: Granularity of burst arrival time and periodicity | discussion | Qualcomm Incorporated |
R2-107 AI: 6.7.2.2.3 |
not treated | [WTS] [JSN] | |||
R2-1913638 | MAC CE structure for PDCP duplication enhancement |
discussion revised to R2-1915818 |
Qualcomm Incorporated |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |||
R2-1913639 | Value of UE-based PDCP duplication |
discussion revised to R2-1915831 |
Qualcomm Incorporated |
R2-107 AI: 6.7.4.2 |
not treated | [WTS] [JSN] | |||
R2-1913640 | PDCP duplication enhancements and RLC AM |
discussion revised to R2-1915815 |
Qualcomm Incorporated |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |||
R2-1913641 | Views on handling of PDUs and data of deprioritized grants |
discussion revised to R2-1915811 |
Qualcomm Incorporated |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |||
R2-1913642 | LCP restriction enhancements for Industrial IoT | discussion | Qualcomm Incorporated |
R2-107 AI: 6.7.2.2 |
noted | [WTS] [JSN] | |||
R2-1913643 | Reference timing delivery determination by RAN | discussion | Qualcomm Incorporated |
R2-107 AI: 6.7.2.1 |
noted | [WTS] [JSN] | |||
R2-1913644 | Principles for EHC header design | discussion | Qualcomm Incorporated |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |||
R2-1913645 | Discussion of RAN1 LS on propagation delay compensation and way forward |
discussion revised to R2-1915812 |
Qualcomm Incorporated |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | |||
R2-1913646 | More granularity for PDCP discardTimer |
discussion revision of R2-1910763 |
Qualcomm Incorporated |
R2-107 AI: 6.7.2.2.3 |
not treated | [WTS] [JSN] | |||
R2-1913647 | Extended MAC CE ID |
discussion revised to R2-1915808 |
Qualcomm Incorporated |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |||
R2-1913648 | Draft LS on signalling of reference timing delivery determination information |
LS out LS To: RAN3, SA2 |
Qualcomm Incorporated |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | |||
R2-1913649 | Remaining Issues on Persistent LBT Failures in NRU | discussion | Charter Communications, Inc |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |||
R2-1913650 | Considerations on T312 enhancements for fast RLF recovery in NR | discussion | Potevio | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.4 |
not treated | [WTS] [JSN] | |
R2-1913651 | Paging Monitoring in NR-U | discussion | Charter Communications, Inc | Rel-16 |
R2-107 AI: 6.2.3.1 |
not treated | [WTS] [JSN] | ||
R2-1913652 | On NR-U Operation in DFS Channels |
discussion revised to R2-1914063 |
Charter Communications, Inc | Rel-16 |
R2-107 AI: 6.2.3.5 |
revised | [WTS] [JSN] | ||
R2-1913653 | System Information Transmission Enhancements in NR-U | discussion | Charter Communications, Inc | Rel-16 |
R2-107 AI: 6.2.3.5 |
not treated | [WTS] [JSN] | ||
R2-1913654 | Consideration of preemptive BSR in IAB | discussion | Kyocera |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |||
R2-1913655 | Further discussion on Backhaul RLF handling | discussion | Kyocera |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |||
R2-1913656 | Inter-node interaction for Conditional PScell addition/change | discussion | CATT | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1913657 | Draft LS on Conditional PSCell addition_change |
LS out LS To: RAN3 |
CATT | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | |
R2-1913658 | Logged MDT for NR-DC and EN-DC | discussion | Kyocera |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |||
R2-1913659 | Recovery due to LBT failures | discussion | Kyocera |
R2-107 AI: 6.2.3.2 |
noted | [WTS] [JSN] | |||
R2-1913660 | PC5-RRC state considerations | discussion | Kyocera |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |||
R2-1913661 | PC5 L2/L3 protocols for unicast and groupcast | discussion | Kyocera |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |||
R2-1913662 | Some Considerations on intra-UE data-data prioritization | discussion | China Telecommunications |
R2-107 AI: 6.7.3.2 |
not treated | [WTS] [JSN] | |||
R2-1913663 | channelBWs parameter and legacy channel bandwidths | discussion | Sprint Corporation |
R2-107 AI: 5.4.4 |
noted | [WTS] [JSN] | |||
R2-1913664 | LCP restrictions for configured grant | discussion | Intel Corporation | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913665 | SL RLF handling | discussion | Qualcomm Incorporated | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | ||
R2-1913666 | Access restrictions (barring) in IAB |
discussion revision of R2-1910806 |
Sharp | Rel-16 |
R2-107 AI: 6.1.5.3 |
not treated | [WTS] [JSN] | ||
R2-1913667 | Skipping supportedBandCombinationList of n90 |
CR revised to R2-1914205 |
KDDI Corporation | 38.306 15.7.0 CR#189 catC | NR_n41_LTE_41_coex | Rel-16 |
R2-107 AI: 6.19 |
revised | [WTS] [JSN] |
R2-1913668 | Validity of CHO configurations based on security configuration |
discussion revised to R2-1915767 |
Sharp | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | ||
R2-1913669 | NE-DC dynamic power sharing capability | CR | Qualcomm Incorporated | 38.331 15.7.0 CR#1330 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
not treated | [WTS] [JSN] |
R2-1913670 | NE-DC dynamic power sharing capability | CR | Qualcomm Incorporated | 38.306 15.7.0 CR#190 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
not treated | [WTS] [JSN] |
R2-1913671 | Clarification on essential system information acquisition | CR | Qualcomm Incorporated | 38.331 15.7.0 CR#1331 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.6 |
not treated | [WTS] [JSN] |
R2-1913672 | Security Algorithms for all Radio Bearer in NR-DC |
CR revised to R2-1913935 |
Qualcomm Incorporated | 38.331 15.7.0 CR#1332 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.8 |
revised | [WTS] [JSN] |
R2-1913673 | Correction on the Msg3 based on demand system information |
CR revised to R2-1915482 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1333 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.6 |
agreed | [WTS] [JSN] |
R2-1913674 | Enhancement on BSR format for the one LCG case | CR | Huawei, HiSilicon | 38.321 15.7.0 CR#670 catF | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1913675 | Discussion on a configuration mismatch between a UE and a target gNB |
discussion revised to R2-1914491 |
KDDI Corporation |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |||
R2-1913676 | Discussion of Guarantee PDCP Duplication Transmission | discussion | III | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1913677 | LTE Mobility Robustness Enhancements for DAPS eMBB HO |
discussion revision of R2-1909844 revised to R2-1914805 |
Qualcomm Incorporated | LTE_feMob-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1913678 | Clarification on informative timer table | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1334 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
not treated | [WTS] [JSN] |
R2-1913679 | DL data delivery for Msg4 fallback case | discussion | LG Electronics UK | Rel-16 |
R2-107 AI: 7.1.2 |
not treated | [WTS] [JSN] | ||
R2-1913680 | Draft LS on MT data delivery in MT EDT |
LS out LS To: SA2 |
LG Electronics UK | LTE_eMTC4-Core, NB_IOTenh2-Core | Rel-16 |
R2-107 AI: 7.1.2 |
not treated | [WTS] [JSN] | |
R2-1913681 | FFS issues on D-PUR | discussion | LG Electronics UK | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913682 | Discussion on D-PUR request and TA validity check |
discussion revised to R2-1915951 |
LG Electronics UK | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913683 | Paging response usign D-PUR |
discussion revised to R2-1915952 |
LG Electronics UK | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913684 | Support for S-PUR |
discussion revision of R2-1911065 revised to R2-1915953 |
LG Electronics UK | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | ||
R2-1913685 | Clarification for aggregated bandwidth for overheating |
CR revised to R2-1914140 |
Huawei, HiSilicon, Ericsson | 38.331 15.7.0 CR#1335 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
revised | [WTS] [JSN] |
R2-1913686 | Correction on procedural text for appliedFreqBandListFilter | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1336 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not pursued | [WTS] [JSN] |
R2-1913687 | Clarification on the feature set report in EUTRAN |
CR revised to R2-1915891 |
Huawei, HiSilicon | 38.331 15.7.0 CR#1337 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1913688 | Corrections on PDCCH blind decoding in NR-DC |
CR revised to R2-1915905 |
Huawei, HiSilicon | 38.306 15.7.0 CR#191 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
not treated | [WTS] [JSN] |
R2-1913689 | Signalling design for overheating reporting in (NG)EN-DC scenario | discussion | Huawei, Huawei Device, China Unicom, MediaTek Inc., Samsung, LG Uplus, vivo | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
noted | [WTS] [JSN] | |
R2-1913690 | 36.331 Draft CR for addressing overheating issue in EN-DC scenario - Option 1 | draftCR | Huawei, Huawei Device | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913691 | 38.331 Draft CR for addressing overheating issue in EN-DC sceanrio - Option 1 | draftCR | Huawei, Huawei Device | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913692 | 36.331 Draft CR for addressing overheating issue in EN-DC scenario - Option 2 | draftCR | Huawei, Huawei Device | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913693 | 37.340 Draft CR for addressing overheating issue in EN-DC scenario - Option 2 | draftCR | Huawei, Huawei Device | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913694 | 38.331 Draft CR for addressing overheating issue in EN-DC scenario - Option 2 | draftCR | Huawei, Huawei Device | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913695 | CR on UE capability for SRS-Tx switch | CR | Huawei, HiSilicon | 38.306 15.7.0 CR#192 catF | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] |
R2-1913696 | Summary on email discussion 107#05 BWCS for inter-ENDC BC with intra-ENDC BC | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
noted | [WTS] [JSN] | |
R2-1913697 | Clarification on description for mandatory capability without capability signalling | CR | Huawei, HiSilicon | 38.306 15.7.0 CR#193 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not pursued | [WTS] [JSN] |
R2-1913698 | Running CR to 36 331 for NR V2X | draftCR | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913699 | TP on NR V2X for TR 37.985 RAN2 parts |
pCR revised to R2-1914117 |
Huawei, HiSilicon | 37.985 0.1.0 | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
revised | [WTS] [JSN] |
R2-1913700 | Discussion about mode coexistence for NR sidelink | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |
R2-1913701 | Discussion on HARQ support for NR sidelink | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1913702 | Discussion on Sidelink Configured Grant support |
discussion revision of R2-1911072 |
Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913703 | Further details of UE assistance information procedure for NR SL |
discussion revision of R2-1911166 |
Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913704 | Further discussion on inter-RAT resource allocation | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.7 |
noted | [WTS] [JSN] | |
R2-1913705 | Identifier assignment to enable Option2 groupcast HARQ |
discussion revision of R2-1911068 |
Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913706 | Discussion on related aspects of system information |
discussion revision of R2-1911093 |
Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913707 | Discussion on remaining issues of SR and BSR for SL Mode 1 | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913708 | Further details of Uu RRC procedures for sidelink | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913709 | Further discussion on NR SL and NR UL prioritization | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913710 | Relationship between PC5-RRC connection and PC5-S connection | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
noted | [WTS] [JSN] | |
R2-1913711 | Remaining issue on sidelink LCP procedure | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1913712 | Remaining issues on SLRB configuration | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1913713 | Support of RLC AM for Sidelink unicast | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913714 | Introduction of cross link interfernce management | draftCR | Huawei, HiSilicon | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
endorsed | [WTS] [JSN] | |
R2-1913715 | Leftover issues on CLI | discussion | Huawei, HiSilicon | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] | |
R2-1913716 | Introduction of wideband PRG size | draftCR | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
endorsed | [WTS] [JSN] | |
R2-1913717 | Introduction of wideband PRG size | draftCR | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
endorsed | [WTS] [JSN] | |
R2-1913718 | Discussion on UDC reconfiguration for RRC connection reestablishment case |
discussion revised to R2-1913988 |
Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
revised | [WTS] [JSN] | |
R2-1913719 | UDC reconfiguration for RRC connection re-establishment case | draftCR | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
postponed | [WTS] [JSN] | |
R2-1913720 | UDC reconfiguration for RRC connection re-establishment case | draftCR | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
postponed | [WTS] [JSN] | |
R2-1913721 | Discussion on providing CAG ID to AS during resume procedure | discussion | Huawei, HiSilicon | NG_RAN_PRN | Rel-16 |
R2-107 AI: 6.18.1 |
not treated | [WTS] [JSN] | |
R2-1913722 | draft Reply LS to CTI on providing CAG ID to AS during resume procedure |
LS out LS is reply to C1-195157 LS To: CT1 |
Huawei, HiSilicon | NG_RAN_PRN | Rel-16 |
R2-107 AI: 6.18.1 |
not treated | [WTS] [JSN] | |
R2-1913723 | Open issue of uplink MDBV enforcement | discussion | Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913724 | Postponed discussions on potential improvements for delay critical QoS flows | discussion | Huawei, HiSilicon | 5GS_Ph1 | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1913725 | Draft Reply LS on potential improvements for delay critical QoS flows |
LS out LS is reply to S2-1906832 LS To: SA2 revised to R2-1914201 |
Huawei, HiSilicon | 5GS_Ph1 | Rel-16 |
R2-107 AI: 6.19 |
revised | [WTS] [JSN] | |
R2-1913726 | Draft CR for 36.323 on supporting DAPS handover | draftCR | Huawei, HiSilicon, Mediatek Inc. | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913727 | Draft CR for 38.323 on supporting DAPS handover | draftCR | Huawei, HiSilicon, Mediatek Inc. | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913728 | Draft LS on UL data forwarding and COUNT initialization |
LS out LS To: RAN3 |
Huawei, HiSilicon, Mediatek Inc. | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913729 | Corrections on the reconfiguration with sync | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1338 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
withdrawn | [WTS] [JSN] |
R2-1913730 | Corrections on the PDCP duplication (de)activation | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1339 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.2 |
not treated | [WTS] [JSN] |
R2-1913731 | Corrections on the condition of PDCP for split SRB | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1340 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.2 |
not treated | [WTS] [JSN] |
R2-1913732 | Discussion on SFTD measurement based on RAN1 LS | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
noted | [WTS] [JSN] | |
R2-1913733 | [draft] Reply LS to RAN1 on SFTD measurement |
LS out LS is reply to R1-1909819 LS To: RAN1 revised to R2-1914162 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
revised | [WTS] [JSN] | |
R2-1913734 | Discussion on adding CSI-RS inter-node message | discussion | Huawei, HiSilicon, China Telecom | TEI16 | Rel-16 |
R2-107 AI: 6.20.3 |
not treated | [WTS] [JSN] | |
R2-1913735 | DRX configuration coordination in (NG)EN-DC |
discussion revised to R2-1914672 |
Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913736 | CR to 36.331 on CGI information | CR | Huawei, HiSilicon, Ericsson | 36.331 15.7.0 CR#4133 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
not pursued | [WTS] [JSN] |
R2-1913737 | CR to 38.331 on CGI information |
CR revised to R2-1914667 |
Huawei, HiSilicon, Ericsson | 38.331 15.7.0 CR#1341 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R2-1913738 | L2 impacts on supporting IIoT traffic |
discussion revised to R2-1915164 |
NTT DOCOMO, INC. | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913739 | [DRAFT] Reply LS to SA3 on FBS detection |
LS out LS is reply to S3-193175 LS To: SA3 revised to R2-1914202 |
Huawei, HiSilicon | FS_5GFBS | Rel-16 |
R2-107 AI: 6.19 |
revised | [WTS] [JSN] | |
R2-1913740 | Discussion on potential RAN2 impact to support false base station detection | discussion | Huawei, HiSilicon | FS_5GFBS | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1913741 | HO and redirection from NR to LTE due to EPS fallback | discussion | Huawei, HiSilicon, China Unicom | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913742 | NR group specific cell configuration | discussion | Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.4 |
not treated | [WTS] [JSN] | |
R2-1913743 | RAN2 impact to support cross-carrier scheduling with different numerologies |
discussion revision of R2-1911155 |
Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.6 |
not treated | [WTS] [JSN] | |
R2-1913744 | Clarification on RAN2 impact to support DL HARQ timing for dual UL EN-DC |
discussion revision of R2-1910194 |
Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.7 |
not treated | [WTS] [JSN] | |
R2-1913745 | Other recovery mechanisms for MCG fast recovery |
discussion revision of R2-1907496 |
Huawei, HiSilicon | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1913746 | Recovery for deprioritized data transmission |
discussion revised to R2-1915163 |
NTT DOCOMO, INC. | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1913747 | Remaining issues on CLI | discussion | LG Electronics Inc | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
noted | [WTS] [JSN] | |
R2-1913748 | draft CR on CLI for TS38 331_v3_Alt1 | CR | LG Electronics Inc | 38.331 15.7.0 CR#1342 catB | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] |
R2-1913749 | draft CR on CLI for TS38 331_v3_Alt2 |
CR revised to R2-1914012 |
LG Electronics Inc | 38.331 15.7.0 CR#1343 catB | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
revised | [WTS] [JSN] |
R2-1913750 | Cell (re)selection after consecutive UL LBT failures | discussion | LG Electronics Inc | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |
R2-1913751 | Remaining issues on camping on non-best cell | discussion | LG Electronics Inc | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.2 |
not treated | [WTS] [JSN] | |
R2-1913752 | RLMRLF in NR-U |
discussion revision of R2-1911407 revised to R2-1916201 |
LG Electronics Inc | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.4 |
not treated | [WTS] [JSN] | |
R2-1913753 | RSSI and channel occupancy measurements for serving frequency |
discussion revision of R2-1911403 revised to R2-1916202 |
LG Electronics Inc | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.3.3 |
not treated | [WTS] [JSN] | |
R2-1913754 | SI change indicaiton in RRC_CONNECTED | discussion | LG Electronics Inc | Rel-16 |
R2-107 AI: 6.21 |
not treated | [WTS] [JSN] | ||
R2-1913755 | Discussion on per beam number of active UEs measurement | discussion | NTT DOCOMO INC. | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | |
R2-1913756 | MAC PDU format of Success RAR | discussion | ETRI |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |||
R2-1913757 | RRC release after EDT for User Plane CIoT EPS optimization |
discussion revision of R2-1910897 revised to R2-1915772 |
Ericsson | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-15 |
R2-107 AI: 7.1.13 |
not treated | [WTS] [JSN] | |
R2-1913758 | RRC release after EDT for User Plane CIoT EPS optimization | draftCR | Ericsson | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-15 |
R2-107 AI: 7.1.13 |
reserved | [WTS] [JSN] | |
R2-1913759 | Redundant retransmission in PDCP duplication |
discussion revision of R2-1909814 revised to R2-1914899 |
LG Electronics Inc., LG Uplus | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.3 |
not treated | [WTS] [JSN] | |
R2-1913760 | Handling of RLC stuck problem with PDCP duplication |
discussion revision of R2-1909817 |
LG Electronics Inc. | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.3 |
withdrawn | [WTS] [JSN] | |
R2-1913761 | MAC CE format for PDCP duplication activation/deactivation |
discussion revised to R2-1914900 |
LG Electronics Inc. | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1913762 | ON Duration adaptation | discussion | LG Electronics Inc. | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
withdrawn | [WTS] [JSN] | |
R2-1913763 | Reduced PDCCH monitoring in CA | discussion | LG Electronics Inc. | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913764 | On the consideration of routing for reporting pre-emptive BSR | discussion | ASUSTeK | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1913765 | Discussion on traditional uplink and IAB uplink traffic for BSR triggering | discussion | ASUSTeK | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1913766 | SR configuration for pre-emptive BSR | discussion | ASUSTeK | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1913767 | Discussion on SCCH configuration |
discussion revision of R2-1911221 |
ASUSTeK | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913768 | Discussion on handling multiple SL communication | discussion | ASUSTeK | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913769 | Discussion on resource allocation for sidelink HARQ ACK/NACK report |
discussion revision of R2-1911223 |
ASUSTeK | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913770 | Discussion on sidelink RLM indication | discussion | ASUSTeK | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913771 | Discussion on requesting and releasing SLRB configuration |
discussion revision of R2-1911225 |
ASUSTeK | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1913772 | Discussion on association between sidelink data and resource allocation modes |
discussion revision of R2-1911226 revised to R2-1916038 |
ASUSTeK | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |
R2-1913773 | DRX timer operation in multi-TB scheduling | discussion | ASUSTeK | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.5 |
not treated | [WTS] [JSN] | |
R2-1913774 | Buffer status indicated by BSR in multi-TB scheduling |
discussion revised to R2-1916043 |
ASUSTeK | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.5 |
not treated | [WTS] [JSN] | |
R2-1913775 | Remaining issues of D-PUR TA timer |
discussion revised to R2-1916042 |
ASUSTeK | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |
R2-1913776 | Group WUS |
discussion revised to R2-1915801 |
Ericsson | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.3 |
not treated | [WTS] [JSN] | |
R2-1913777 | Discussion on UE location information in SCG failure report |
discussion revised to R2-1916154 |
NTT DOCOMO INC. , Ericsson | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
not treated | [WTS] [JSN] | |
R2-1913778 | Discussion on groupcast HARQ in NR SL | discussion | LG Electronics Inc. | 5G_V2X_NRSL | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913779 | Discussion on HARQ enable and disable | discussion | LG Electronics Inc. | 5G_V2X_NRSL | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913780 | Discussion on measurement and report in NR SL | discussion | LG Electronics Inc. | 5G_V2X_NRSL | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913781 | Discussion on remaining issues of mode 1 operation | discussion | LG Electronics Inc. | 5G_V2X_NRSL | Rel-16 |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |
R2-1913782 | Discussion on SFTD measurement between NR PSCell and NR neighbour cells in EN-DC | discussion | Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913783 | Correction on parameter description of beamManagementSSB-CSI-RS in 38.306 |
CR revised to R2-1914663 |
Huawei, HiSilicon | 38.306 15.7.0 CR#194 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1913784 | Random access without UE location information | discussion | Huawei, HiSilicon | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913785 | Random access with UE location information | discussion | Huawei, HiSilicon | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913786 | RACH resource configuration and utilization in NTN | discussion | Huawei, HiSilicon | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913787 | Further discussion on the impact of PDCCH-WUS | discussion | Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | |
R2-1913788 | Discussion on efficient RRC state transition | discussion | Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.3 |
not treated | [WTS] [JSN] | |
R2-1913789 | Further discussion on the MIMO layer adaptation | discussion | Huawei, HiSilicon | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.4 |
not treated | [WTS] [JSN] | |
R2-1913790 | UE assistance information in MR-DC | discussion | Huawei, Huawei Device, CMCC, MediaTek Inc., China Telecom, vivo | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.5 |
noted | [WTS] [JSN] | |
R2-1913791 | Service continuity between terrestrial network (TN) and non-terrestrial network (NTN) | discussion | HUGHES Network Systems Ltd | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | ||
R2-1913792 | Problems in Evaluation of CHO Execution Condition |
discussion revision of R2-1909228 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1913793 | Combination of CHO and RUDI Handover |
discussion revised to R2-1915037 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |
R2-1913794 | Faster Handover Failure Recovery |
discussion revision of R2-1909230 revised to R2-1915038 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.4 |
not treated | [WTS] [JSN] | |
R2-1913795 | PDCP/RLC Re-establishment in DAPS Handover | discussion | ETRI | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913796 | Data Forwarding Options and Interruption Time |
discussion revision of R2-1909233 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913797 | Bye Message for RUDI Handover |
discussion revised to R2-1915040 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913798 | Source Cell Release in DAPS Handover |
discussion revised to R2-1915041 |
ETRI | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913799 | Control plane management during/after DAPS HO | discussion | LG Electronics France | NR_Mob_enh-Core |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913800 | On the need of earlier packet forwarding | discussion | LG Electronics France | NR_Mob_enh-Core |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | ||
R2-1913801 | Access copntrol in IAB networks | discussion | LG Electronics France | NR_IAB-Core |
R2-107 AI: 6.1.5.3 |
not treated | [WTS] [JSN] | ||
R2-1913802 | F1AP over LTE | discussion | LG Electronics France | NR_IAB-Core |
R2-107 AI: 6.1.2 |
noted | [WTS] [JSN] | ||
R2-1913803 | Resolving open issues on BH RLF | discussion | LG Electronics France | NR_IAB-Core |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | ||
R2-1913804 | Resue of CSG features for NPN cells | discussion | LG Electronics France | NG_RAN_PRN-Core |
R2-107 AI: 6.18.2 |
not treated | [WTS] [JSN] | ||
R2-1913805 | Handling of RLC stuck problem with PDCP duplication |
discussion revision of R2-1909817 revised to R2-1914901 |
LG Electronics Inc., LG Uplus | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.3 |
not treated | [WTS] [JSN] | |
R2-1913806 | ON Duration adaptation | discussion | LG Electronics Inc., LG Uplus | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913807 | Use of range parameter | discussion | MediaTek Inc. | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | ||
R2-1913808 | Remaining issues in SDAP layer | discussion | MediaTek Inc. | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1913809 | Inter-RAT BSR | discussion | MediaTek Inc. | Rel-16 |
R2-107 AI: 6.4.7 |
not treated | [WTS] [JSN] | ||
R2-1913810 | Discussion on local decision make for routing | discussion | Samsung | NR_IAB | Rel-16 |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |
R2-1913811 | UL mapping configuration | discussion | Samsung | NR_IAB | Rel-16 |
R2-107 AI: 6.1.3.2 |
not treated | [WTS] [JSN] | |
R2-1913812 | Further discussions on bearer mapping configuration for CP and UP | discussion | Samsung | NR_IAB | Rel-16 |
R2-107 AI: 6.1.3.2 |
not treated | [WTS] [JSN] | |
R2-1913813 | Upstream BH link RLF notification | discussion | Samsung | NR_IAB | Rel-16 |
R2-107 AI: 6.1.5.1 |
not treated | [WTS] [JSN] | |
R2-1913814 | Clarification on the using of RRCSetup | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1345 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
not treated | [WTS] [JSN] |
R2-1913815 | LCID space extension and MAC format |
discussion revision of R2-1911334 |
LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.2 |
not treated | [WTS] [JSN] | |
R2-1913816 | Consideration on LCG space extension |
discussion revision of R2-1911335 |
LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.2 |
not treated | [WTS] [JSN] | |
R2-1913817 | LCG based UL grant |
discussion revision of R2-1911338 revised to R2-1916137 |
LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.3 |
not treated | [WTS] [JSN] | |
R2-1913818 | BSR MAC CE format for pre-BSR |
discussion revision of R2-1911339 revised to R2-1916134, R2-2001554 |
LG Electronics Inc., LG Uplus | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.4.1 |
not treated | [WTS] [JSN] | |
R2-1913819 | Further details for DL flow control | discussion | LG Electronics Inc., LG Uplus | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.3 |
postponed | [WTS] [JSN] | |
R2-1913820 | Consideration on local route selection in IAB node |
discussion revision of R2-1911341 |
LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.1 |
not treated | [WTS] [JSN] | |
R2-1913821 | BAP layer configuration for data forwarding | discussion | LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.4 |
not treated | [WTS] [JSN] | |
R2-1913822 | Way forward for CP bearer mapping |
discussion revised to R2-1916138 |
LG Electronics Inc. | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3.2 |
not treated | [WTS] [JSN] | |
R2-1913823 | Retransmission of an RLC SDU with a poll after discard procedure | discussion | LG Electronics Inc. | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913824 | Running CR to 36.321 on 5G V2X with NR sidelink | draftCR | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913825 | Running CR to 38.321 on 5G V2X with NR sidelink | draftCR | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913826 | Layer-1 and Layer 2 Identifiers for NR Sidelink |
discussion revision of R2-1910635 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1913827 | Proposed LS on Layer-1 and Layer 2 Identifiers for NR Sidelink |
LS out LS To: RAN1 revision of R2-1910636 revised to R2-1914120 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
revised | [WTS] [JSN] | |
R2-1913828 | Delivery of PC5-S Signaling and PC5-RRC messages |
discussion revision of R2-1910640 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
noted | [WTS] [JSN] | |
R2-1913829 | Proposed LS on PC5-S Signaling for NR Sidelink |
LS out LS To: SA2 revision of R2-1910641 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913830 | PC5-RRC connection and procedures with PC5-S and Uu RRC | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913831 | Report of email discussion [107#57][NB-IoT eMTC R16] WUS configuration | report | ZTE Corporation, Sanechips | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.3 |
not treated | [WTS] [JSN] | |
R2-1913832 | RRC release for User Plane EDT |
discussion revision of R2-1911132 |
III | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.13 |
not treated | [WTS] [JSN] | |
R2-1913833 | Procedures and MAC CE design for BFR for SCells |
discussion revision of R2-1911504 revised to R2-1916067 |
Qualcomm Incorporated | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913834 | Clarification on measurement gap for LTE inter-RAT measurement in NR SA |
CR revised to R2-1913978 |
MediaTek Inc., Nokia (Rapporteur) | 38.3 15.7.0 CR#173 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.1 |
revised | [WTS] [JSN] |
R2-1913835 | Discussion on early measurement configuration upon state transition |
discussion revised to R2-1914917 |
MediaTek Inc. | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | |
R2-1913836 | Discussion on performing ROHC |
discussion revision of R2-1907557 |
LG Electronics Inc. | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |
R2-1913837 | Need for Primary path | discussion | LG Electronics Inc., LG Uplus | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
not treated | [WTS] [JSN] | |
R2-1913838 | Discussion on LCH-to-Cell restriction for PDCP duplication | discussion | LG Electronics Inc. | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.4.1 |
noted | [WTS] [JSN] | |
R2-1913839 | PDCP SN gap issue in fast MCG link recovery | discussion | LG Electronics Inc. | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.5 |
not treated | [WTS] [JSN] | |
R2-1913840 | Handling of RLF for eMOB | discussion | LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913841 | Discussion on PDCP impacts for eMOB/feMOB | discussion | LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913842 | When to apply the target network configurations | discussion | LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913843 | Dicussion on RUDI HO for UM DRB | discussion | LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913844 | Scheduling enhancement in NTN |
discussion revision of R2-1904730 |
LG Electronics Inc. | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913845 | Integrity verification and PDCP duplication |
discussion revision of R2-1904728 |
LG Electronics Inc. | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913846 | Extension of the LCID |
discussion revised to R2-1915914 |
LG Electronics Inc. | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913847 | Report of [107#81][NR TEI16] Need-for-Gaps signalling |
discussion revised to R2-1914914 |
MediaTek Inc. | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913848 | Discussion on de-prioritized MAC PDU on CG resource |
discussion revision of R2-1910976 |
LG Electronics Polska, LG Uplus | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1913849 | Broadcast of TBS assistance data |
CR revised to R2-1914075 |
NextNav, AT&T, FirstNet, Polaris Wireless | 36.331 15.7.0 CR#4134 catC | TEI16, LCS_LTE_acc_enh-Core | Rel-16 |
R2-107 AI: 7.6 |
revised | [WTS] [JSN] |
R2-1913850 | Broadcast of TBS assistance data |
CR revised to R2-1914076 |
NextNav, AT&T, FirstNet, Polaris Wireless | 36.355 15.5.0 CR#246 catC | TEI16, LCS_LTE_acc_enh-Core | Rel-16 |
R2-107 AI: 7.6 |
revised | [WTS] [JSN] |
R2-1913851 | Correction to mobility from NR | CR | Google Inc. | 38.331 15.7.0 CR#1346 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
not pursued | [WTS] [JSN] |
R2-1913852 | Discussion on multiple active CGs for NR-U | discussion | LG Electronics Polska | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.5 |
noted | [WTS] [JSN] | |
R2-1913853 | CR on NeedForGap capability for each supported NR band before EN-DC configuration | draftCR | Nokia, Nokia Shanghai Bell | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
not treated | [WTS] [JSN] | |
R2-1913854 | Discussion on contention resolution timer in NR-U |
discussion revision of R2-1910981 |
LG Electronics Polska | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913855 | Discussion on L2 measurement in EN-DC |
discussion revised to R2-1916150 |
NTT DOCOMO INC. | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | |
R2-1913856 | Considerations on simultaneous configuration of mode 1 and 2 |
discussion revision of R2-1911404 revised to R2-1916025 |
ITL | Rel-16 |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | ||
R2-1913857 | Correction to mobility from E-UTRA | CR | Google Inc. | 36.331 15.7.0 CR#4135 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
not treated | [WTS] [JSN] |
R2-1913858 | Discussion on MAC PDU overwritten issue | discussion | LG Electronics Polska | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.5 |
not treated | [WTS] [JSN] | |
R2-1913859 | Discussion and Decision | discussion | LG Electronics | NR_IAB-Core |
R2-107 AI: 6.1.3.4 |
not treated | [WTS] [JSN] | ||
R2-1913860 | Consideration of CHO Configuration Update | discussion | LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1913861 | Draft LS on CHO Configuration Update |
LS out LS To: RAN3 |
LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1913862 | Consideration on Invalid Cell Handling in CHO |
discussion revised to R2-1916209 |
LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1913863 | ReportConifg ID for CHO Condition | discussion | LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |
R2-1913864 | Handling Excess of UE Capability in DAPS HO |
discussion revised to R2-1916210 |
LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913865 | RLM Handling of Enhanced MBB HO |
discussion revision of R2-1911114 |
LG Electronics Inc. | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913866 | Signalling Delay in NTN |
discussion revision of R2-1911110 |
LG Electronics Inc. | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913867 | Consideration on Default SLRB |
discussion revision of R2-1911423 |
ITL |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1913868 | Sidelink HARQ retransmission in mode 1 |
discussion revision of R2-1911411 |
ITL |
R2-107 AI: 6.4.3 |
not treated | [WTS] [JSN] | |||
R2-1913869 | Discussion on DRX operation associated with disabling HARQ feedback |
discussion revised to R2-1916148 |
LG Electronics Polska | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | |
R2-1913870 | RNTI design for msgB |
discussion revision of R2-1909826 |
LG Electronics Inc. | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
not treated | [WTS] [JSN] | |
R2-1913871 | Discussion on the flow control |
discussion revised to R2-1916141 |
ITL |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |||
R2-1913872 | Remaining issues on 2-step random access resource | discussion | LG Electronics | NR_2step_RACH-Core |
R2-107 AI: 6.13.5 |
not treated | [WTS] [JSN] | ||
R2-1913873 | Remaining issue on NR SL QoS and SLRB configurations |
discussion revision of R2-1911420 |
ITL |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |||
R2-1913874 | MAC PDU formats for msgB |
discussion revision of R2-1909828 |
LG Electronics Polska | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |
R2-1913875 | Need for RAPID MAC CE in payload of msgA |
discussion revision of R2-1909825 |
LG Electronics Inc. | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.3 |
not treated | [WTS] [JSN] | |
R2-1913876 | Common delay for initial access | other | ETRI | Rel-16 |
R2-107 AI: 6.6.3.1 |
not treated | [WTS] [JSN] | ||
R2-1913877 | Logical channel based RA type selection |
discussion revision of R2-1909827 revised to R2-1916029 |
LG Electronics Inc. | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | |
R2-1913878 | MAC impacts of multiple CCAs in wide band operation |
discussion revision of R2-1909829 revised to R2-1916153 |
LG Electronics Polska | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.7 |
not treated | [WTS] [JSN] | |
R2-1913879 | Consideration on 2-step CFRA |
discussion revised to R2-1916028 |
LG Electronics | NR_2step_RACH-Core |
R2-107 AI: 6.13.6 |
not treated | [WTS] [JSN] | ||
R2-1913880 | Draft LS on SCell BFR Operation |
LS out LS is reply to R2-1912013 LS To: RAN1 |
Apple | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.4 |
not treated | [WTS] [JSN] | |
R2-1913881 | Handling of new flow when the number of stored contexts are already equal to the MAX_CID |
discussion revised to R2-1916110 |
SHARP Corporation | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.3 |
not treated | [WTS] [JSN] | |
R2-1913882 | On RLC UM for RUDI HO | discussion | SHARP Corporation | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
not treated | [WTS] [JSN] | |
R2-1913883 | On voice fallback enhancement | discussion | SHARP Corporation | Rel-16 |
R2-107 AI: 6.20.1 |
noted | [WTS] [JSN] | ||
R2-1913884 | Remaining issue on PC5 RLM/RLF | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913885 | Discussion on PC5 RRC Connection | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
not treated | [WTS] [JSN] | |
R2-1913886 | Discussion on assistance information for resource allocation in NR SL | discussion | LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1913887 | Running CR to 38.300 on 5G V2X with NR sidelink |
draftCR revised to R2-1914000, R2-1914114 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1913888 | L4S support in 5G | discussion | Ericsson, Vodafone, Nokia, Nokia Shanghai Bell, Sprint | NR_newRAT-Core, TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
noted | [WTS] [JSN] | |
R2-1913889 | New BSR trigger for EN-DC |
discussion revised to R2-1915643 |
Ericsson | NR_newRAT-Core, TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | |
R2-1913890 | Clarification to CSI reporting in C-DRX | CR | Qualcomm Inc | 38.321 15.7.0 CR#671 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.3.1 |
withdrawn | [WTS] [JSN] |
R2-1913891 | Correction to PHR in dual connectivity |
CR revision of R2-1911305 |
Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | 36.321 15.7.0 CR#6602 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.3.1 |
withdrawn | [WTS] [JSN] |
R2-1913892 | Configuration aspects of wakeup signaling | discussion | Qualcomm Inc | Rel-16 |
R2-107 AI: 6.11.2 |
withdrawn | [WTS] [JSN] | ||
R2-1913893 | Cross cell group wakeup message in MR-DC | discussion | Qualcomm Inc, Futurewei | Rel-16 |
R2-107 AI: 6.20.2 |
withdrawn | [WTS] [JSN] | ||
R2-1913894 | UE indication on expected data |
discussion revision of R2-1911304 |
Qualcomm Inc, Apple | Rel-16 |
R2-107 AI: 6.11.5 |
withdrawn | [WTS] [JSN] | ||
R2-1913895 | Backoff indication in multi-beam operation |
discussion revision of R2-1911307 |
Qualcomm Inc | Rel-16 |
R2-107 AI: 6.20.2 |
withdrawn | [WTS] [JSN] | ||
R2-1913896 | Enhancements to PHR in multi-beam operation |
discussion revision of R2-1911308 |
Qualcomm Inc | Rel-16 |
R2-107 AI: 6.20.2 |
withdrawn | [WTS] [JSN] | ||
R2-1913897 | Clarification to CSI reporting in C-DRX |
CR revised to R2-1913936 |
Qualcomm Inc | 38.321 15.7.0 CR#672 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.3.1 |
revised | [WTS] [JSN] |
R2-1913898 | Correction to PHR in dual connectivity |
CR revision of R2-1911305 revised to R2-1916173 |
Qualcomm Inc, Nokia, Nokia Shanghai Bell, Ericsson | 36.321 15.7.0 CR#6602 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.3.1 |
agreed | [WTS] [JSN] |
R2-1913899 | Configuration aspects of wakeup signaling |
discussion revised to R2-1913947, R2-1916175 |
Qualcomm Inc | Rel-16 |
R2-107 AI: 6.11.2 |
revised | [WTS] [JSN] | ||
R2-1913900 | Cross cell group wakeup message in MR-DC | discussion | Qualcomm Inc, Futurewei | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | ||
R2-1913901 | UE indication on expected data |
discussion revision of R2-1911304 revised to R2-1916179 |
Qualcomm Inc, Apple | Rel-16 |
R2-107 AI: 6.11.5 |
not treated | [WTS] [JSN] | ||
R2-1913902 | Backoff indication in multi-beam operation |
discussion revision of R2-1911307 |
Qualcomm Inc | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | ||
R2-1913903 | Enhancements to PHR in multi-beam operation |
discussion revision of R2-1911308 |
Qualcomm Inc | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] | ||
R2-1913904 | Discussion on Fast failure recovery alternatives to WA | discussion | Samsung Electronics Polska |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |||
R2-1913905 | Discussion on Remaining issues related to T312 | discussion | Samsung Electronics Polska |
R2-107 AI: 6.9.3.4 |
noted | [WTS] [JSN] | |||
R2-1913906 | DISC_Resume_procedure_CAG_ID |
discussion revised to R2-1913959 |
Samsung Electronics Polska |
R2-107 AI: 6.18.1 |
revised | [WTS] [JSN] | |||
R2-1913907 | L2 Throughput measurement | discussion | Samsung Electronics Polska |
R2-107 AI: 6.12.3 |
not treated | [WTS] [JSN] | |||
R2-1913908 | Discussion on Performing CHO instaed of RRE in CHO | discussion | Samsung, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated |
R2-107 AI: 6.9.3.2 |
not treated | [WTS] [JSN] | |||
R2-1913909 | CHO UE behaviour upon transitioning to RRC_INACTIVE/RRC_IDLE | discussion | Samsung Electronics Polska |
R2-107 AI: 6.9.3.1 |
not treated | [WTS] [JSN] | |||
R2-1913910 | Specification Impacts to specify Single Stack solution for NR | discussion | Samsung Electronics Polska |
R2-107 AI: 7.3.2.3 |
not treated | [WTS] [JSN] | |||
R2-1913911 | Single stack eMOB solution for 1Rx NR Ues | discussion | Samsung Electronics Polska |
R2-107 AI: 7.3.2.3 |
noted | [WTS] [JSN] | |||
R2-1913912 | Correction on common search space | CR | Google Inc. | 38.331 15.7.0 CR#1347 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.6 |
not pursued | [WTS] [JSN] |
R2-1913913 | Further considerations on handling UL LBT failures | discussion | ETRI | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.2 |
not treated | [WTS] [JSN] | |
R2-1913914 | Clarification on criteria selection for 2-step RACH and 4-step RACH | discussion | Qualcomm Incorporated | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
noted | [WTS] [JSN] | |
R2-1913915 | Further consideration on SCG resumption | discussion | LG Electronics Inc. | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
not treated | [WTS] [JSN] | |
R2-1913916 | Study on application of CHO mechanism to Conditional PSCell addition change | discussion | NTT DOCOMO INC. | NR_Mob_enh-Core |
R2-107 AI: 6.9.4 |
not treated | [WTS] [JSN] | ||
R2-1913917 | Considerations on satellite location sharing |
discussion revision of R2-1911424 |
ETRI | Rel-16 |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1913918 | Conditional resumption with validity check | discussion | LG Electronics Inc. | Rel-16 |
R2-107 AI: 6.10.4.3 |
not treated | [WTS] [JSN] | ||
R2-1913919 | Further consideration on capability reporting |
discussion revised to R2-1916151 |
LG Electronics Inc. | Rel-16 |
R2-107 AI: 6.10.3 |
not treated | [WTS] [JSN] | ||
R2-1913920 | Hop-by-Hop Flow control for IAB |
discussion revised to R2-1915723 |
Futurewei Technologies |
R2-107 AI: 6.1.3.3 |
not treated | [WTS] [JSN] | |||
R2-1913921 | Discussion on UE behavior for stored SCG/SCell configuration | discussion | MediaTek Inc. | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
not treated | [WTS] [JSN] | |
R2-1913922 | Discussion on supporting SN terminated Split SRB for IAB CP in NSA deployments |
discussion revision of R2-1911803 |
Futurewei |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |||
R2-1913923 | Discussion on fixed vs. steerable beams in NTN LEO |
discussion revised to R2-1916240 |
Nokia, Nokia Shanghai Bell | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
noted | [WTS] [JSN] | |
R2-1913924 | Pre-trigger based mobility for NTN LEO with fixed beams |
discussion revision of R2-1910694 revised to R2-1916242 |
Nokia, Nokia Shanghai Bell | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913925 | To agree on the remaining NTN-TN service continuity aspects | discussion | Nokia, Nokia Shanghai Bell | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |
R2-1913926 | UE positioning requirements in NTN |
discussion revision of R2-1910693 |
Nokia, Nokia Shanghai Bell | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4 |
not treated | [WTS] [JSN] | |
R2-1913927 | Consideration on LEO mobility in NTN | discussion | CENC |
R2-107 AI: 6.6.4.1 |
not treated | [WTS] [JSN] | |||
R2-1913928 | NR Paging Frame Calculation when SearchSpaceId is Zero |
discussion revised to R2-1914891 |
MediaTek Inc. |
R2-107 AI: 5.4.5.2 |
not treated | [WTS] [JSN] | |||
R2-1913929 | Source RLM handling for RUDI HO with DAPS |
discussion revision of R2-1911421 |
SHARP Corporation | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.1 |
not treated | [WTS] [JSN] | |
R2-1913930 | Considerations on the use of satellite Id in NTN |
discussion revision of R2-1910695 |
Nokia, Nokia Shanghai Bell | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4 |
noted | [WTS] [JSN] | |
R2-1913931 | Report of email discussion [107#58][R16 NB-IoT/eMTC] RRC messages for D-PUR transmission and response | report | Huawei | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
noted | [WTS] [JSN] | |
R2-1913932 | Clarification on PUR release upon missing ‘m’ consecutive occasions | discussion | Gemalto N.V., Qualcomm Incorporated |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |||
R2-1913933 | Transmission in preconfigured resources |
discussion revision of R2-1908990 |
Gemalto N.V. |
R2-107 AI: 7.2.4 |
not treated | [WTS] [JSN] | |||
R2-1913934 | Periodicity and burst arrival encoding in TSCAI |
discussion revision of R2-1913452 |
Nokia, Nokia Shanghai Bell | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.3 |
noted | [WTS] [JSN] | |
R2-1913935 | Security Algorithms for all Radio Bearer in SA |
CR revision of R2-1913672 revised to R2-1914130 |
Qualcomm Incorporated | 38.331 15.7.0 CR#13321 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.8 |
revised | [WTS] [JSN] |
R2-1913936 | Clarification to CSI reporting in C-DRX |
CR revision of R2-1913897 revised to R2-1914175 |
Qualcomm Inc. | 38.321 15.7.0 CR#6721 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.3.1 |
revised | [WTS] [JSN] |
R2-1913937 | CR of TS 36.305 for introducing NavIC in LTE |
CR revised to R2-1914766 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | 36.305 15.4.0 CR#84 catB | LCS_NAVIC | Rel-16 |
R2-107 AI: 7.7 |
endorsed | [WTS] [JSN] |
R2-1913938 | CR of TS 36.355 for introducing NavIC in LTE |
CR revised to R2-1914071 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | 36.355 15.5.0 CR#247 catB | LCS_NAVIC | Rel-16 |
R2-107 AI: 7.7 |
revised | [WTS] [JSN] |
R2-1913939 | CR of TS 36.331 for introducing NavIC in LTE |
CR revised to R2-1914765 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | 36.331 15.7.0 CR#4137 catB | LCS_NAVIC | Rel-16 |
R2-107 AI: 7.7 |
endorsed | [WTS] [JSN] |
R2-1913940 | Further considerations on RRM relaxation about reporting and coexistence with early measurements |
discussion revision of R2-1913341 |
LG Electronics | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.6 |
not treated | [WTS] [JSN] | |
R2-1913941 | Left issues on MAC for NR-V2X |
discussion revision of R2-1912070 |
OPPO | 5G_V2X_NRSL-Core |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | ||
R2-1913942 | Introduction of dormancy behavior in NR |
discussion revision of R2-1912285 |
OPPO | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.2 |
not treated | [WTS] [JSN] | |
R2-1913943 | Simultaneous use of mode 1 and mode 2 |
discussion revision of R2-1910965 revised to R2-1915828 |
KT Corp. |
R2-107 AI: 6.4.8 |
not treated | [WTS] [JSN] | |||
R2-1913944 | CR to 38.331 on configuration of rach-ConfigCommon in initial UL BWP for RRC triggered BWP switch |
CR revision of R2-1912199 revised to R2-1913957 |
Qualcomm Incorporated | 38.331 15.7.0 CR#13441 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.1 |
revised | [WTS] [JSN] |
R2-1913945 | Running CR on on-demand SI procedure in RRC_CONNECTED |
draftCR revision of R2-1913317 |
Ericsson | TEI16 | Rel-16 |
R2-107 AI: 6.21 |
not treated | [WTS] [JSN] | |
R2-1913946 | Draft Reply LS on Sending CAG ID in NAS layer |
LS out LS To: SA3, SA2, RAN3 |
Qualcomm Incorporated | NG_RAN_PRN-Core | Rel-16 |
R2-107 AI: 6.18.1 |
not treated | [WTS] [JSN] | |
R2-1913947 | Configuration aspects of wakeup signaling |
discussion revision of R2-1913899 |
Qualcomm Inc | Rel-16 |
R2-107 AI: 6.11.2 |
not treated | [WTS] [JSN] | ||
R2-1913948 | Report of 107#73 NR V2X SDAP(vivo) |
discussion revision of R2-1912263 |
vivo | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1913949 | Some open issues for TS 37.320 to support NR MDT | discussion | CMCC | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.2 |
not treated | [WTS] [JSN] | |
R2-1913950 | Running TS 37.320 CR |
draftCR revision of R2-1912962 |
CMCC, Nokia | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.1 |
endorsed | [WTS] [JSN] | |
R2-1913951 | Impact of non-Numeric K1 Value to NR-U DRX |
discussion revision of R2-1913558 |
Qualcomm Incorporated, Ericsson |
R2-107 AI: 6.2.2.4 |
not treated | [WTS] [JSN] | |||
R2-1913952 | Email discussion summary of [107#55][IIOT] CG/SPS for TSC |
discussion revision of R2-1912726 |
OPPO | Rel-16 |
R2-107 AI: 6.7.2.2.1 |
noted | [WTS] [JSN] | ||
R2-1913953 | Report of email discussion [107#64][NTN] Cell selection&reselection |
pCR revision of R2-1913345 revised to R2-1914070 |
LG Electronics | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
revised | [WTS] [JSN] |
R2-1913954 | Draft LS on F1 over LTE |
LS out LS To: RAN3 revised to R2-1914179 |
KDDI Corporation | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
revised | [WTS] [JSN] | |
R2-1913955 | [107#80][NR IIOT] Summary on Deprioritized PDUs (CATT) |
discussion revision of R2-1912214 |
CATT | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.3.1 |
noted | [WTS] [JSN] | |
R2-1913956 | Correction on PRACH re-transmission for SRS carrier switching |
CR revision of R2-1913282 |
Huawei, HiSilicon, MediaTek | 38.321 15.7.0 CR#6681 catF | TEI16 | Rel-16 |
R2-107 AI: 6.20.2 |
not treated | [WTS] [JSN] |
R2-1913957 | CR to 38.331 on configuration of rach-ConfigCommon in initial UL BWP for RRC triggered BWP switch |
CR revision of R2-1913944 |
Qualcomm Incorporated | 38.331 15.7.0 CR#13442 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.1 |
postponed | [WTS] [JSN] |
R2-1913958 | Correction to AS security key update |
CR revised to R2-1914126 |
Ericsson | 38.331 15.7.0 CR#1348 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
revised | [WTS] [JSN] |
R2-1913959 | Transmission of CAG ID during Resume Procedure |
discussion revision of R2-1913906 |
Samsung | Rel-16 |
R2-107 AI: 6.19 |
not treated | [WTS] [JSN] | ||
R2-1913960 | CR to 36.331 on support of F1AP over LTE for IAB | draftCR | AT&T, KDDI | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |
R2-1913961 | CR to 38.331 on support of F1AP over LTE for IAB | draftCR | AT&T, KDDI | NR_IAB-Core | Rel-15 |
R2-107 AI: 6.1.2 |
not treated | [WTS] [JSN] | |
R2-1913962 | Propagation delay compensation for accurate reference timing |
discussion revision of R2-1913470 |
Huawei, HiSilicon, China Southern Power Grid Co., Ltd | NR_IIOT-Core |
R2-107 AI: 6.7.2.1 |
not treated | [WTS] [JSN] | ||
R2-1913963 | Remaining issues of reference time delivery |
discussion revision of R2-1913471 |
Huawei, HiSilicon, China Southern Power Grid Co., Ltd | NR_IIOT-Core |
R2-107 AI: 6.7.2.1 |
noted | [WTS] [JSN] | ||
R2-1913964 | Importing consequences if not approved from RAN1 and RAN4 excel files |
CR revision of R2-1913020 revised to R2-1915508 |
Nokia, Nokia Shanghai Bell | 38.306 15.7.0 CR#1761 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1913965 | On FR2 CA fall-backs |
discussion revision of R2-1913022 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not treated | [WTS] [JSN] | |
R2-1913966 | Discussion on priority misalignment issue | discussion | OPPO, Apple | LTE_V2X-Core |
R2-107 AI: 4.3 |
noted | [WTS] [JSN] | ||
R2-1913967 | Extended PO and early termination for page monitoring |
discussion revision of R2-1912644 |
Ericsson | NR_unlic-Core |
R2-107 AI: 6.2.3.1 |
not treated | [WTS] [JSN] | ||
R2-1913968 | Cell (re)selection for NR-U |
discussion revision of R2-1912645 |
Ericsson | NR_unlic-Core |
R2-107 AI: 6.2.3.2 |
noted | [WTS] [JSN] | ||
R2-1913969 | [107#61][NR/NTN] Rapporteur Running TP |
pCR revision of R2-1913406 |
THALES | 38.821 0.7.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.1 |
agreed | [WTS] [JSN] |
R2-1913970 | Reconfiguration with sync for NE-DC |
CR revision of R2-1913268 |
Google Inc., Ericsson | 38.331 15.7.0 CR#12951 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
not pursued | [WTS] [JSN] |
R2-1913971 | Handover in (NG)EN-DC | CR | Google Inc., Ericsson | 36.331 15.7.0 CR#4138 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
not treated | [WTS] [JSN] |
R2-1913972 | Update LS on Release-with-Redirect in 2-step resume procedure (C1-196902; contact: OPPO) |
LS in LS is reply to R2-1905465 source LS: C1-196902 LS To: RAN2 |
CT1 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
noted | [WTS] [JSN] | |
R2-1913973 | LS Reply on maximum value of MDBV (C3-194330; contact: Nokia) |
LS in LS is reply to S2-1907955 source LS: C3-194330 LS To: SA2 |
CT3 | 5GS_Ph1 | Rel-16 |
R2-107 AI: 6.19 |
not treated | [WTS] [JSN] | |
R2-1913974 | Handling of fallbacks for combined contiguous and non-contiguous CA in FR2 |
discussion revision of R2-1913383 |
Apple | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not treated | [WTS] [JSN] | |
R2-1913975 | Further consideration on HARQ configuration in NTN |
discussion revision of R2-1913173 revised to R2-1914197 |
CMCC,Huawei,HiSilicon,Sony,KT Corp. | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
revised | [WTS] [JSN] | |
R2-1913976 | Clarification of NR-DC synchronization |
CR revised to R2-1914810 |
ZTE Corporation | 37.34 15.7.0 CR#163 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.1 |
agreed | [WTS] [JSN] |
R2-1913977 | [DRAFT] [Reply LS to RAN3] |
LS out LS is reply to R3-194758 LS To: RAN3 |
Huawei | Rel-16 |
R2-107 AI: 5.1 |
withdrawn | [WTS] [JSN] | ||
R2-1913978 | Clarification on measurement gap for LTE inter-RAT measurement in NR SA |
CR revision of R2-1913834 revised to R2-1914955 |
MediaTek Inc., Nokia (Rapporteur) | 38.3 15.7.0 CR#1731 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.1 |
agreed | [WTS] [JSN] |
R2-1913979 | SMTC setting in MR-DC PSCell change |
CR revision of R2-1913018 revised to R2-1915505 |
Nokia, Nokia Shanghai Bell | 37.34 15.7.0 CR#1571 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1913980 | Correction on sending Failure Information via SRB3 |
CR revision of R2-1913312 revised to R2-1915365 |
Ericsson, ZTE Corporation (Rapporteur) | 37.34 15.7.0 CR#1591 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1913981 | Clarification on RA and Msg3 with PUSCH Enhancements |
CR revision of R2-1913553 revised to R2-1915624 |
Nokia, Nokia Shanghai Bell | 36.321 14.11.0 CR#14563 catF | LTE_VoLTE_ViLTE_enh | Rel-14 |
R2-107 AI: 4.5 |
agreed | [WTS] [JSN] |
R2-1913982 | Clarification on RA and Msg3 with PUSCH Enhancements |
CR revision of R2-1913554 revised to R2-1915625 |
Nokia, Nokia Shanghai Bell | 36.321 15.7.0 CR#14572 catA | LTE_VoLTE_ViLTE_enh | Rel-15 |
R2-107 AI: 4.5 |
agreed | [WTS] [JSN] |
R2-1913983 | Missing QCI to CAPC mapping |
CR revision of R2-1912982 revised to R2-2000663 |
Nokia, Nokia Shanghai Bell | 36.3 15.7.0 CR#12403 catF | LTE_unlic-Core | Rel-16 |
R2-107 AI: 4.5 |
agreed | [WTS] [JSN] |
R2-1913984 | Correction to SIB5 acquisition for idle mode measurements |
CR revision of R2-1913314 revised to R2-1915367 |
Ericsson | 36.331 15.7.0 CR#41201 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-107 AI: 4.5 |
agreed | [WTS] [JSN] |
R2-1913985 | Correction on inter-frequency neighbour cell measurements |
CR revision of R2-1913315 revised to R2-1915368, R2-1915524 |
Ericsson | 36.3 15.7.0 CR#12521 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-107 AI: 4.5 |
agreed | [WTS] [JSN] |
R2-1913986 | Correction to the handling of stored AS context upon CN type change |
CR revision of R2-1912758 revised to R2-1915837 |
Huawei, HiSilicon | 36.304 15.4.0 CR#7721 catF | LTE_5GCN_connect-Core | Rel-15 |
R2-107 AI: 4.5 |
postponed | [WTS] [JSN] |
R2-1913987 | Result of offline discussion 101 on RSSI and channel occupancy measurement in LAA | discussion | Qualcomm Incorporated | LTE_LAA-Core | Rel-15 |
R2-107 AI: 4.5 |
withdrawn | [WTS] [JSN] | |
R2-1913988 | Discussion on UDC reconfiguration for RRC connection reestablishment case |
discussion revision of R2-1913718 |
Huawei, HiSilicon | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
noted | [WTS] [JSN] | |
R2-1913989 | Correction on H1 and H2 events |
CR revision of R2-1912446 revised to R2-2002078 |
Samsung Electronics Co., Ltd | 36.331 15.7.0 CR#41031 catF | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
agreed | [WTS] [JSN] |
R2-1913990 | Clarification of e-mail discussion for QoE measurements | discussion | Ericsson | TEI16 | Rel-16 |
R2-107 AI: 7.5 |
postponed | [WTS] [JSN] | |
R2-1913991 | [Draft] LS on uplink TDM pattern for LTE DAPS based enhanced make-before-break HO |
LS out LS To: RAN1 revised to R2-1913996 |
Qualcomm Incorporated | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
revised | [WTS] [JSN] | |
R2-1913992 | [DRAFT] LS on PDCP agreements |
LS out LS To: RAN3 revised to R2-1914025 |
Huawei, HiSilicon, Mediatek Inc. | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
revised | [WTS] [JSN] | |
R2-1913993 | [Draft] LS for DAPS Handover UE capabilities |
LS out LS To: RAN1, RAN4 revised to R2-1913999 |
Intel Corporation | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
revised | [WTS] [JSN] | |
R2-1913994 | Result of offline discussion 109 on RAN2 agreements for interruption reduction feature name | discussion | Huawei | LTE_feMob-Core, NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | |
R2-1913995 | Running CR for the introduction of NR mobility enhancement |
CR revision of R2-1912781 revised to R2-2000460 |
Intel Corporation | 38.3 15.7.0 CR#1721 catB | NR_Mob_enh-Core | Rel-16 |
R2-107 AI: 6.9.1 |
available | [WTS] [JSN] |
R2-1913996 | LS on uplink TDM pattern for LTE DAPS based enhanced make-before-break HO |
LS out LS To: RAN1 LS reply in R1-1913093, R1-1913395, R1-1913581, R1-1913396, R1-1913686 revision of R2-1913991 |
RAN2 | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.2 |
approved | [WTS] [JSN] | |
R2-1913997 | LS on UE feature list format for Release-16 UE capability |
LS out LS To: RAN1, RAN4 |
RAN2 | NR_newRAT-Core | Rel-16 |
R2-107 AI: 6 |
approved | [WTS] [JSN] | |
R2-1913998 | NR_IAB running CR for 38300 |
CR revision of R2-1911552 revised to R2-1916641 |
Qualcomm Inc (Rapporteur) | 38.3 15.7.0 CR#1535 catB | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.1 |
available | [WTS] [JSN] |
R2-1913999 | LS to RAN1&4 on UE capabilities on DAPS HO |
LS out LS To: RAN1, RAN4 LS reply in R4-1913392, R4-1914108, R1-1911976, R1-1913396, R1-1913395, R1-1913581 revision of R2-1913993 |
Intel Corporation | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.2.2 |
available | [WTS] [JSN] | |
R2-1914000 | Running CR to 38.300 on 5G V2X with NR sidelink |
draftCR revision of R2-1913887 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1914001 | Running RRC CR for NR-based Access to Unlicensed Spectrum |
draftCR revision of R2-1913575 |
Qualcomm Incorporated | NR_unlic-Core | Rel-15 |
R2-107 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914002 | Running CR for NR-based Access to Unlicensed Spectrum |
draftCR revision of R2-1912303 |
Qualcomm Incorporated | NR_unlic-Core | Rel-15 |
R2-107 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914003 | Running Idle/Inactive mode CR for NR-based Access to Unlicensed Spectrum |
draftCR revision of R2-1913576 |
Qualcomm Incorporated | NR_unlic-Core | Rel-15 |
R2-107 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914004 | Running CR for 36.300 for CA/DC Enhancements |
draftCR revision of R2-1912540 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1914005 | Running CR for 38.300 for CA/DC Enhancements |
draftCR revision of R2-1912541 |
Ericsson LM | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1914006 | TS 38.340 (BAP), v0.0.0 |
draft TS revision of R2-1913254 |
Huawei | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3 |
endorsed | [WTS] [JSN] | |
R2-1914007 | Running CR for introduction of even further mobility enhancement in E-UTRAN |
draftCR revision of R2-1912417 |
China Telecom | LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.1 |
available | [WTS] [JSN] | |
R2-1914008 | TS 38.340 (BAP), v0.1.0 | draft TS | Huawei | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.3 |
endorsed | [WTS] [JSN] | |
R2-1914009 | Stage-2 running CR for support of NR Industrial IoT WI |
draftCR revision of R2-1911545 |
Nokia (Rapporteur) | NR_IIOT | Rel-15 |
R2-107 AI: 6.7.1 |
available | [WTS] [JSN] | |
R2-1914010 | Running CR to 38.331 on Integrated Access and Backhaul for NR |
draftCR revision of R2-1913177 revised to R2-1914027 |
Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.2 |
revised | [WTS] [JSN] | |
R2-1914011 | [DRAFT] LS on multi PDCCH-based multi-TRP operation |
LS out LS To: RAN1 revised to R2-1914015 |
Ericsson | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.3 |
revised | [WTS] [JSN] | |
R2-1914012 | draft CR on CLI for TS38 331_v3_Alt2 |
CR revision of R2-1913749 |
LG Electronics Inc | 38.331 15.7.0 CR#13431 catB | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] |
R2-1914013 | LS For Exchange of information related to SRS-RSRP measurement resource configuration for UE-CLI |
LS out LS To: RAN3 revision of R2-1912409 revised to R2-1914021 |
Nokia, Nokia Shanghai Bell | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
revised | [WTS] [JSN] | |
R2-1914014 | Running CR for the introduction of SRVCC from 5G to 3G |
draftCR revision of R2-1913126 |
Huawei, HiSilicon, China Unicom | SRVCC_NR_to_UMTS-Core | Rel-16 |
R2-107 AI: 6.14.1 |
approved | [WTS] [JSN] | |
R2-1914015 | [DRAFT] LS on multi PDCCH-based multi-TRP operation |
LS out LS To: RAN1 revision of R2-1914011 revised to R2-1914020 |
Ericsson | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.3 |
revised | [WTS] [JSN] | |
R2-1914016 | [DRAFT] LS on No support of delta signalling |
LS out LS To: SA2 revised to R2-1914022 |
MediaTek | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
revised | [WTS] [JSN] | |
R2-1914017 | [DRAFT] LS Radio Capability Signalling Identity on X2/Xn interfaces |
LS out LS To: RAN3 revised to R2-1914023 |
Nokia | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
revised | [WTS] [JSN] | |
R2-1914018 | Introduction of UECapabilityInformation segmentation in 36.331 |
draftCR revision of R2-1912810 |
MediaTek Inc., CATT, Ericsson, Spreadtrum Communications, ZTE Corporation, Sanechips, OPPO, Qualcomm Incorporated | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.3 |
endorsed | [WTS] [JSN] | |
R2-1914019 | Introduction of UECapabilityInformation segmentation in 36.331 | draftCR | ZTE | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.3 |
endorsed | [WTS] [JSN] | |
R2-1914020 | LS on multi PDCCH-based and single PDCCH-based multi-TRP operation |
LS out LS To: RAN1 revision of R2-1914015 |
RAN2 | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.3 |
approved | [WTS] [JSN] | |
R2-1914021 | LS For Exchange of information related to SRS-RSRP measurement resource configuration for UE-CLI |
LS out LS To: RAN3 LS reply in R3-196851 revision of R2-1914013 |
RAN2 | NR_CLI_RIM | Rel-16 |
R2-107 AI: 6.15 |
approved | [WTS] [JSN] | |
R2-1914022 | LS on No support of delta signalling |
LS out LS To: SA2 revision of R2-1914016 |
RAN2 | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
approved | [WTS] [JSN] | |
R2-1914023 | LS Radio Capability Signalling Identity on X2/Xn interfaces |
LS out LS To: RAN3 LS reply in R3-196965 revision of R2-1914017 |
RAN2 | RACS-RAN-Core | Rel-16 |
R2-107 AI: 6.5.2 |
approved | [WTS] [JSN] | |
R2-1914024 | Summary of email discussion on LS to RAN3 on RAN2 agreements | discussion | Huawei, HiSilicon, Mediatek Inc. | NR_Mob_enh-Core, LTE_feMob-Core |
R2-107 AI: 7.3.2.1.1 |
noted | [WTS] [JSN] | ||
R2-1914025 | LS on RAN2 agreements on LTE and NR mobility enhancements |
LS out LS To: RAN3 revision of R2-1913992 |
RAN2 | NR_Mob_enh-Core, LTE_feMob-Core | Rel-16 |
R2-107 AI: 7.3.2.1.1 |
approved | [WTS] [JSN] | |
R2-1914026 | Running MAC CR for NR-U | draftCR | Ericsson | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914027 | Running CR to 38.331 on Integrated Access and Backhaul for NR |
draftCR revision of R2-1914010 |
Ericsson | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.5.2 |
available | [WTS] [JSN] | |
R2-1914028 | (reserved) | other | Sergio's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914029 | (reserved) | other | Sergio's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914030 | (reserved) | other | Sergio's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914031 | (reserved) | other | Sergio's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914032 | (reserved) | other | Sergio's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914033 | (reserved) | other | Sergio's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914034 | (reserved) | other | Sergio's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914035 | (reserved) | other | Sergio's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914036 | Introduction of Rel-16 eMTC enhancements |
CR revision of R2-1912864 |
Intel Corporation | 36.3 15.7.0 CR#12511 catB | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
endorsed | [WTS] [JSN] |
R2-1914037 | Introduction of additional enhancements for eMTC |
CR revised to R2-1915609 |
Qualcomm Incorporated | 38.3 15.7.0 CR#175 catB | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
endorsed | [WTS] [JSN] |
R2-1914038 | Introduction of Rel-16 eMTC enhancements |
draftCR revision of R2-1913601 revised to R2-1915717 |
Qualcomm Incorporated | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
endorsed | [WTS] [JSN] | |
R2-1914039 | Report of offline #301: Discussion on whether I-RNTI is adopted for UP CIoT 5GS Optimisation | discussion | LGE | Rel-16 |
R2-107 AI: 7.1.12.1 |
not treated | [WTS] [JSN] | ||
R2-1914040 | [DRAFT] LS on RAN2 agreements for 5GC CIoT |
LS out LS To: RAN3 revised to R2-1914044 |
Qualcomm | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.12.1 |
revised | [WTS] [JSN] | |
R2-1914041 | Summary of Offline discussion #303: RRC_INACTIVE for eMTC UEs connected to 5GC | discussion | Huawei, HiSilicon |
R2-107 AI: 7.1.12.2 |
noted | [WTS] [JSN] | |||
R2-1914042 | Running CR for 36.304 -Rel-16 eMTC Enhancements |
discussion revision of R2-1912414 revised to R2-1914046 |
Nokia, Nokia Shanghai Bell | Rel-16 |
R2-107 AI: 7.1.1 |
revised | [WTS] [JSN] | ||
R2-1914043 | Clarification on UP-EDT |
CR revision of R2-1912605 revised to R2-1915308 |
Huawei, HiSilicon | 36.331 15.7.0 CR#41041 catF | LTE_eMTC4-Core, NB_IOTenh2-Core | Rel-15 |
R2-107 AI: 4.2 |
postponed | [WTS] [JSN] |
R2-1914044 | [DRAFT] LS on RAN2 agreements for 5GC CIoT |
LS out LS To: RAN3 revision of R2-1914040 revised to R2-1914045 |
Qualcomm | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.12.1 |
revised | [WTS] [JSN] | |
R2-1914045 | LS on RAN2 agreements for 5GC CIoT |
LS out LS To: RAN3 revision of R2-1914044 |
RAN2 | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.1.12.1 |
approved | [WTS] [JSN] | |
R2-1914046 | Running CR for 36.304 -Rel-16 eMTC Enhancements |
draftCR revision of R2-1914042 revised to R2-1914049 |
Nokia, Nokia Shanghai Bell | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
revised | [WTS] [JSN] | |
R2-1914047 | [36.321 running CR] | draftCR | Ericsson | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
endorsed | [WTS] [JSN] | |
R2-1914048 | [Report from Email [107bis#65][eMTC R16] UE identifier pros and cons (LG)] | report | LGE | Rel-16 |
R2-107 AI: 7.1.12.1 |
reserved | [WTS] [JSN] | ||
R2-1914049 | Running CR for 36.304 -Rel-16 eMTC Enhancements |
draftCR revision of R2-1914046 revised to R2-1914050 |
Nokia, Nokia Shanghai Bell | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
revised | [WTS] [JSN] | |
R2-1914050 | Running CR for 36.304 -Rel-16 eMTC Enhancements |
draftCR revision of R2-1914049 revised to R2-1916365 |
Nokia, Nokia Shanghai Bell | LTE_eMTC5-Core | Rel-16 |
R2-107 AI: 7.1.1 |
endorsed | [WTS] [JSN] | |
R2-1914051 | [DRAFT] LS to RAN1 on 2-step RACH |
LS out LS To: RAN1 revised to R2-1914067 |
ZTE | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
revised | [WTS] [JSN] | |
R2-1914052 | Summary of discussion on rebudiling and fallback | discussion | Nokia |
R2-107 AI: 6.13.2 |
noted | [WTS] [JSN] | |||
R2-1914053 | [DRAFT] LS on SFN LSB indication in msg2/msgB |
LS out LS To: RAN1 revised to R2-1914064 |
Qualcomm | NR_unlic-Core, NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
revised | [WTS] [JSN] | |
R2-1914054 | Summary of discussion on UL LBT | discussion | InterDigital |
R2-107 AI: 6.2.2.2 |
noted | [WTS] [JSN] | |||
R2-1914055 | Clarification on satellite beam and PCI mapping |
pCR revision of R2-1913563 |
THALES, ERICSSON, Nokia | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4 |
agreed | [WTS] [JSN] |
R2-1914056 | DRX HARQ RTT enhancements for NTN |
pCR revision of R2-1912695 |
Nomor Research GmbH | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
agreed | [WTS] [JSN] |
R2-1914057 | LS to RAN1 on WUS for short DRX cycle |
LS out LS To: RAN1 revised to R2-1914060 |
vivo | NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.2 |
revised | [WTS] [JSN] | |
R2-1914058 | Offline #506 Release assistance | discussion | Ericsson | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.3 |
noted | [WTS] [JSN] | |
R2-1914059 | Summary of offline discussion on UE assistance for Scell | discussion | CATT | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.5 |
noted | [WTS] [JSN] | |
R2-1914060 | LS to RAN1 on WUS for short DRX cycle |
LS out LS To: RAN1 LS reply in R1-1913454, R1-1913574, R1-1913583 revision of R2-1914057 |
RAN2 | NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.2 |
approved | [WTS] [JSN] | |
R2-1914061 | LS to RAN1 on question related to CSI/SRS reporting |
LS out LS To: RAN1 revised to R2-1914200 |
vivo | NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.2 |
revised | [WTS] [JSN] | |
R2-1914062 | TP editorial corrections | discussion | Nomor |
R2-107 AI: 6.6.3.2 |
noted | [WTS] [JSN] | |||
R2-1914063 | On NR-U Operation in DFS Channels |
discussion revision of R2-1913652 |
Charter Communications, Inc | Rel-16 |
R2-107 AI: 6.2.3.5 |
noted | [WTS] [JSN] | ||
R2-1914064 | LS on SFN LSB indication in msg2/msgB |
LS out LS To: RAN1 LS reply in R1-1912914, R1-1913571, R1-1913582 revision of R2-1914053 |
RAN2 | NR_unlic-Core, NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.2.2.1 |
approved | [WTS] [JSN] | |
R2-1914065 | (reserved) | other | Diana's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914066 | [DRAFT] LS on PHR reporting for NR-U |
LS out LS To: RAN1 revised to R2-1914068 |
Lenovo | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.7 |
revised | [WTS] [JSN] | |
R2-1914067 | [DRAFT] LS on differentiating between MSG2 and MSGB |
LS out LS To: RAN1 revision of R2-1914051 revised to R2-1914191 |
ZTE | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
revised | [WTS] [JSN] | |
R2-1914068 | LS on PHR reporting for NR-U |
LS out LS To: RAN1 LS reply in R1-1912835, R1-1912909, R1-1913531, R1-1913584 revision of R2-1914066 |
RAN2 | NR_unlic-Core | Rel-16 |
R2-107 AI: 6.2.2.7 |
approved | [WTS] [JSN] | |
R2-1914069 | TP on RACH capacity evaluation and procedures |
discussion revision of R2-1912665 |
ZTE Corporation, Sanechips,China Southern Power Grid Co., Ltd | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
agreed | [WTS] [JSN] | |
R2-1914070 | Report of email discussion [107#64][NTN] Cell selection&reselection |
pCR revision of R2-1913953 |
LG Electronics | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
agreed | [WTS] [JSN] |
R2-1914071 | CR of TS 36.355 for introducing NavIC in LTE |
CR revision of R2-1913938 revised to R2-1914764 |
Reliance Jio, MediaTek Inc., Huawei, CEWiT, Saankhya Labs | 36.355 15.5.0 CR#2471 catB | LCS_NAVIC | Rel-16 |
R2-107 AI: 7.7 |
endorsed | [WTS] [JSN] |
R2-1914072 | Corrections for Positioning Architecture |
CR revision of R2-1913425 revised to R2-1915655 |
Ericsson | 38.305 15.4.0 CR#151 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.3 |
agreed | [WTS] [JSN] |
R2-1914073 | [RAN2#107bis Offline-402] Converge on details of SSR Correction Points definition |
discussion revision of R2-1912520 |
u-blox AG | Rel-16 |
R2-107 AI: 6.8.2.2 |
noted | [WTS] [JSN] | ||
R2-1914074 | Sensor Provide Location Information Elements Correction |
CR revision of R2-1912422 |
Polaris Wireless | 36.355 15.5.0 CR#2451 catF | TEI16 | Rel-16 |
R2-107 AI: 7.6 |
endorsed | [WTS] [JSN] |
R2-1914075 | Broadcast of TBS assistance data |
CR revision of R2-1913849 revised to R2-2000396 |
NextNav, AT&T, FirstNet, Polaris Wireless | 36.331 15.7.0 CR#41341 catC | TEI16, LCS_LTE_acc_enh-Core | Rel-16 |
R2-107 AI: 7.6 |
endorsed | [WTS] [JSN] |
R2-1914076 | Broadcast of TBS assistance data |
CR revision of R2-1913850 revised to R2-2000398 |
NextNav, AT&T, FirstNet, Polaris Wireless | 36.355 15.5.0 CR#2461 catC | TEI16, LCS_LTE_acc_enh-Core | Rel-16 |
R2-107 AI: 7.6 |
endorsed | [WTS] [JSN] |
R2-1914077 | (reserved) | other | Nathan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914078 | (reserved) | other | Nathan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914079 | (reserved) | other | Nathan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914080 | (reserved) | other | Nathan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914081 | (reserved) | other | Nathan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914082 | (reserved) | other | Nathan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914083 | (reserved) | other | Nathan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914084 | (reserved) | other | Nathan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914085 | (reserved) | other | Nathan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914086 | [DRAFT] Reply LS on PDCP end user throughput measurements |
LS out LS To: SA5 revised to R2-1914089 |
CMCC | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
revised | [WTS] [JSN] | |
R2-1914087 | Reply LS on RACH Optimization and Mobility Robustness Optimization |
LS out LS To: RAN3 LS reply in R3-197668 |
RAN2 | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.4 |
approved | [WTS] [JSN] | |
R2-1914088 | (reserved) | other | HuNan's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914089 | Reply LS on PDCP end user throughput measurements |
LS out LS To: SA5 revision of R2-1914086 |
RAN2 | NR_SON_MDT-Core | Rel-16 |
R2-107 AI: 6.12.3 |
approved | [WTS] [JSN] | |
R2-1914090 | Report from session on SON/MDT |
report revision of R2-1914136 |
Session chair (CMCC) |
R2-107 AI: 7.8.6 |
approved | [WTS] [JSN] | |||
R2-1914091 | Correction on T322 |
CR revision of R2-1913191 revised to R2-1914649 |
Nokia, Nokia Shanghai Bell | 36.331 14.12.0 CR#41121 catF | NB_IOTenh-Core | Rel-14 |
R2-107 AI: 4.1 |
agreed | [WTS] [JSN] |
R2-1914092 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC |
other revision of R2-1913426 revised to R2-1914102 |
Document Rapporteur (BlackBerry) | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R2-1914093 | Introduction of additional enhancements for NB-IoT |
CR revised to R2-1915608 |
Qualcomm Incorporated | 38.3 15.7.0 CR#176 catB | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
endorsed | [WTS] [JSN] |
R2-1914094 | Introduction of additional enhancements for NB-IoT |
draftCR revision of R2-1912599 revised to R2-1915299 |
Huawei | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914095 | Report of Offline discussion #703 (Qualcomm) For alignment of eMTC and NB-IoT 36.331 CR | report | Qualcomm | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R2-1914096 | Report from offline #704 | discussion | Qualcomm Incorporated | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.3 |
noted | [WTS] [JSN] | |
R2-1914097 | Clarification of PDCCH monitoring period with non-zero DRX-startoffset for NB-IoT |
CR revision of R2-1913067 |
NTT DOCOMO INC. | 36.321 15.7.0 CR#14581 catF | NB_IOTenh2-Core | Rel-15 |
R2-107 AI: 4.1 |
not treated | [WTS] [JSN] |
R2-1914098 | Summary of offline #706 | discussion | Qualcomm Incorporated | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.4 |
noted | [WTS] [JSN] | |
R2-1914099 | Running CR on 36.321 for NB-IoT | draftCR | Ericsson | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914100 | [Running CR on 36.304] | draftCR | Nokia | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
reserved | [WTS] [JSN] | |
R2-1914101 | Introduction of additional enhancements for NB-IoT in TS 36.331 |
draftCR revision of R2-1912598 revised to R2-1915298 |
Huawei | NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
endorsed | [WTS] [JSN] | |
R2-1914102 | RAN2 agreements for Rel-16 additional enhancements for NB-IoT and MTC |
other revision of R2-1914092 |
Document Rapporteur (BlackBerry) | LTE_eMTC5-Core, NB_IOTenh3-Core | Rel-16 |
R2-107 AI: 7.2.1 |
available | [WTS] [JSN] | |
R2-1914103 | (reserved) | other | Brian's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914104 | (reserved) | other | Brian's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914105 | (reserved) | other | Brian's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914106 | (reserved) | other | Brian's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914107 | (reserved) | other | Brian's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914108 | (reserved) | other | Brian's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914109 | (reserved) | other | Brian's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914110 | (reserved) | other | Brian's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914111 | 38 323 running CR |
draftCR revision of R2-1912164 |
CATT | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1914112 | Running CR to 37324 for 5G_V2X_NRSL |
draftCR revision of R2-1912252 revised to R2-1914152 |
vivo (Rapporteur) | 5G_V2X_NRSL-Core | Rel-15 |
R2-107 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1914113 | Running CR for 38.322 for NR V2X |
draftCR revision of R2-1913331 revised to R2-1914146 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
revised | [WTS] [JSN] | |
R2-1914114 | Running CR to 38.300 on 5G V2X with NR sidelink |
draftCR revision of R2-1913887 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
not treated | [WTS] [JSN] | |
R2-1914115 | (running)36.304CR on cell selection(reselection) for NR V2X UE |
draftCR revision of R2-1912392 |
ZTE Corporation, Sanechips | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
not treated | [WTS] [JSN] | |
R2-1914116 | (running)38.304CR on cell selection(reselection) for NR V2X UE |
draftCR revision of R2-1912393 |
ZTE Corporation, Sanechips | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
not treated | [WTS] [JSN] | |
R2-1914117 | TP on NR V2X for TR 37.985 RAN2 parts |
pCR revision of R2-1913699 |
Huawei, HiSilicon | 37.985 0.1.0 | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
endorsed | [WTS] [JSN] |
R2-1914118 | [DRAFT] LS on SL RLF handling |
LS out LS To: SA2 revised to R2-1914149 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
revised | [WTS] [JSN] | |
R2-1914119 | Summary of RAN2#107bis Offline-807 | discussion | vivo | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1914120 | Proposed LS on Layer-1 and Layer 2 Identifiers for NR Sidelink |
LS out LS To: RAN1 revision of R2-1913827 revised to R2-1914147 |
LG Electronics Inc. | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
revised | [WTS] [JSN] | |
R2-1914121 | Clarification regarding QoS handling in MRDC with 5G CN |
draftCR revision of R2-1913589 |
Samsung, ZTE Corporation | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
agreed | [WTS] [JSN] | |
R2-1914122 | PDCP version in EN-DC |
CR revision of R2-1912364 revised to R2-1915122 |
Ericsson | 37.34 15.7.0 CR#1551 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.2.2 |
agreed | [WTS] [JSN] |
R2-1914123 | Remaining issues for correction on the condition of RBTermChange |
CR revision of R2-1913304 |
Ericsson | 38.331 15.7.0 CR#13071 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.2 |
not treated | [WTS] [JSN] |
R2-1914124 | Correction to field conditions in NE-DC |
CR revision of R2-1913518 revised to R2-1915722 |
Ericsson | 36.331 15.7.0 CR#41281 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
agreed | [WTS] [JSN] |
R2-1914125 | Correction for the establishment of LTE RLC bearers for (NG)EN-DC and NE-DC |
CR revision of R2-1913632 revised to R2-1915589 |
Huawei, HiSilicon | 36.331 15.7.0 CR#41321 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
agreed | [WTS] [JSN] |
R2-1914126 | Correction to AS security key update |
CR revision of R2-1913958 |
Ericsson | 38.331 15.7.0 CR#13481 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.4 |
reserved | [WTS] [JSN] |
R2-1914127 | Presence and absence of TAC in NR cell |
CR revision of R2-1913542 revised to R2-1915672 |
Ericsson | 38.331 15.7.0 CR#13251 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.6 |
agreed | [WTS] [JSN] |
R2-1914128 | Configuration limitation for RRCRelease message in R15 |
CR revision of R2-1912290 |
OPPO | 38.331 15.7.0 CR#12681 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.7 |
agreed | [WTS] [JSN] |
R2-1914129 | KgNB derivation upon mobility |
CR revised to R2-1915031 |
Qualcomm Incorporated | 38.3 15.7.0 CR#174 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.8 |
agreed | [WTS] [JSN] |
R2-1914130 | Security Algorithms for Radio Bearers |
CR revision of R2-1913935 revised to R2-1914225 |
Qualcomm Incorporated | 38.331 15.7.0 CR#13322 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.8 |
revised | [WTS] [JSN] |
R2-1914131 | Report from session on LTE legacy, LTE TEI16 and NR/LTE Rel-16 Mobility | report | Vice Chairman (Nokia) |
R2-107 AI: 7.8.1 |
approved | [WTS] [JSN] | |||
R2-1914132 | Report from Break-Out Session on SRVCC, CLI, PRN, eMIMO, RACS | report | Vice Chairman (ZTE) |
R2-107 AI: 7.8.2 |
approved | [WTS] [JSN] | |||
R2-1914133 | Report eMTC breakout session | report | Session chair (Ericsson) |
R2-107 AI: 7.8.3 |
approved | [WTS] [JSN] | |||
R2-1914134 | Session minutes for NR-U, Power Savings, NTN and 2-step RACH | report | Session chair (InterDigital) |
R2-107 AI: 7.8.4 |
approved | [WTS] [JSN] | |||
R2-1914135 | Report from session on Rel-15 and 16 LTE and NR positioning | report | Session chair (MediaTek) |
R2-107 AI: 7.8.5 |
approved | [WTS] [JSN] | |||
R2-1914136 | Report from session on SON/MDT |
report revised to R2-1914090 |
Session chair (CMCC) |
R2-107 AI: 7.8.6 |
revised | [WTS] [JSN] | |||
R2-1914137 | Report NB-IoT breakout session | report | Session chair (Huawei) |
R2-107 AI: 7.8.7 |
approved | [WTS] [JSN] | |||
R2-1914138 | Report from session on LTE V2X and NR V2X | report | Session chair (Samsung) |
R2-107 AI: 7.8.8 |
approved | [WTS] [JSN] | |||
R2-1914139 | Definition of NR standalone |
CR revision of R2-1913541 revised to R2-1915673 |
Ericsson | 38.331 15.7.0 CR#13241 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
postponed | [WTS] [JSN] |
R2-1914140 | Clarification for aggregated bandwidth for overheating |
CR revision of R2-1913685 revised to R2-1915890 |
Huawei, HiSilicon, Ericsson | 38.331 15.7.0 CR#13351 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
postponed | [WTS] [JSN] |
R2-1914141 | WF on flexible BSR | discussion | OPPO | 5G_V2X_NRSL-Core | Rel-15 |
R2-107 AI: 6.4.2 |
noted | [WTS] [JSN] | |
R2-1914142 | [Offline-811] Support of SL RLC AM | discussion | Huawei, HiSilicon | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
not treated | [WTS] [JSN] | |
R2-1914143 | [DRAFT] LS on Handling Multiple Unicast Links with Peer UE |
LS out LS To: RAN1 revised to R2-1914150 |
InterDigital | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
revised | [WTS] [JSN] | |
R2-1914144 | [DRAFT] LS on PC5-S Signaling and PC5-RRC connection for NR sidelink communication |
LS out LS To: SA2 revised to R2-1914151 |
LGE | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
revised | [WTS] [JSN] | |
R2-1914145 | (reserved) | other | Kyeongin's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914146 | Running CR for 38.322 for NR V2X |
draftCR revision of R2-1914113 |
Ericsson | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.1 |
endorsed | [WTS] [JSN] | |
R2-1914147 | LS on Layer 2 Identifiers for NR Sidelink communication |
LS out LS To: RAN1, SA2 revision of R2-1914120 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.2 |
approved | [WTS] [JSN] | |
R2-1914148 | (reserved) | other | Kyeongin's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914149 | LS on SL RLF handling |
LS out LS To: SA2 revision of R2-1914118 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
approved | [WTS] [JSN] | |
R2-1914150 | LS on Handling Multiple Unicast Links with Peer UE |
LS out LS To: RAN1 revision of R2-1914143 |
RAN2 | 5G_V2X_NRSL-Core | Rel-16 |
R2-107 AI: 6.4.5 |
approved | [WTS] [JSN] | |
R2-1914151 | LS on PC5-S Signaling and PC5-RRC connection for NR sidelink communication |
LS out LS To: SA2 revision of R2-1914144 |
RAN2 | 5G_V2X_NRSL | Rel-16 |
R2-107 AI: 6.4.5 |
approved | [WTS] [JSN] | |
R2-1914152 | Running CR to 37324 for 5G_V2X_NRSL |
draftCR revision of R2-1914112 |
vivo (Rapporteur) | 5G_V2X_NRSL-Core | Rel-15 |
R2-107 AI: 6.4.1 |
available | [WTS] [JSN] | |
R2-1914153 | (reserved) | other | Kyeongin's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914154 | (reserved) | other | Kyeongin's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914155 | (reserved) | other | Kyeongin's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914156 | (reserved) | other | Kyeongin's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914157 | (reserved) | other | Kyeongin's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914158 | (reserved) | CR | Kyeongin's tdocs | 38.306 15.12.0 | TEI16 | Rel-15 |
R2-107 AI: 8 |
reserved | [WTS] [JSN] |
R2-1914159 | (reserved) | other | Kyeongin's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914160 | (reserved) | other | Kyeongin's tdocs |
R2-107 AI: 8 |
reserved | [WTS] [JSN] | |||
R2-1914161 | Correction of UE assistance information |
draftCR revision of R2-1913588 revised to R2-1915707 |
Samsung, Ericsson | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
postponed | [WTS] [JSN] | |
R2-1914162 | [draft] Reply LS to RAN1 on SFTD measurement |
LS out LS is reply to R1-1909819 LS To: RAN1 revision of R2-1913733 revised to R2-1914221 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
revised | [WTS] [JSN] | |
R2-1914163 | Work plan for Rel-16 UE Capability feature list | discussion | Intel Corporation |
R2-107 AI: 6 |
not treated | [WTS] [JSN] | |||
R2-1914164 | Draft reply LS on full configuration during SN Modification procedure |
LS out LS is reply to R2-1912033 LS To: RAN3 revision of R2-1913608 revised to R2-1914218 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
revised | [WTS] [JSN] | |
R2-1914165 | NTN_RAN2_107bis_offline1_outcomes | report | Thales | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.1 |
noted | [WTS] [JSN] | |
R2-1914166 | NTN_RAN2_107bis_offline2_outcomes | report | Thales | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.1 |
noted | [WTS] [JSN] | |
R2-1914167 | Correction to power limitations in (NG)EN-DC |
CR revision of R2-1913309 revised to R2-1915360 |
Ericsson | 36.331 15.7.0 CR#41191 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.2 |
postponed | [WTS] [JSN] |
R2-1914168 | LS on CLI measurement reporting range (R4-1911416; contact: LGE) |
LS in source LS: R4-1911416 LS To: RAN2 |
RAN4 | NR_CLI_RIM-Core | Rel-16 |
R2-107 AI: 6.15 |
not treated | [WTS] [JSN] | |
R2-1914169 | Correction to Pcompensation for FR2 |
CR revised to R2-1915525 |
Huawei | 38.304 15.5.0 CR#140 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R2-1914170 | [DRAFT] Reply LS on FR2 Pmax |
LS out LS To: RAN4 revised to R2-1914222 |
Huawei | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
revised | [WTS] [JSN] | |
R2-1914171 | IAB routing and bearer mapping config | discussion | Qualcomm Incorporated (Rapporteur) |
R2-107 AI: 6.1.3 |
not treated | [WTS] [JSN] | |||
R2-1914172 | Correction of SRB3 handling at full configuration (Alt2) |
CR revision of R2-1913306 revised to R2-1915361 |
Ericsson | 38.331 15.7.0 CR#13081 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
agreed | [WTS] [JSN] |
R2-1914173 | Miscellaneous correction for late drop |
CR revision of R2-1913307 revised to R2-1915370 |
Ericsson | 36.331 15.7.0 CR#41171 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
agreed | [WTS] [JSN] |
R2-1914174 | Discussion on phase of the LTE CHO procedure |
discussion revision of R2-1913068 |
China Telecommunications |
R2-107 AI: 6.9.3.3 |
not treated | [WTS] [JSN] | |||
R2-1914175 | Clarification to CSI reporting in C-DRX |
CR revision of R2-1913936 revised to R2-1916172 |
Qualcomm Inc. | 38.321 15.7.0 CR#6722 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.3.1 |
agreed | [WTS] [JSN] |
R2-1914176 | Discussion on QoS flow in SLRB |
discussion revision of R2-1913377 |
Apple | FS_NR_V2X | Rel-16 |
R2-107 AI: 6.4.6 |
not treated | [WTS] [JSN] | |
R2-1914177 | Reply LS to LS on maximum value of MDBV (C4-194314; contact: Nokia) |
LS in LS is reply to S2-1907955 source LS: C4-194314 LS To: SA2 |
CT4 | 5GS_Ph1 | Rel-16 |
R2-107 AI: 6.19 |
noted | [WTS] [JSN] | |
R2-1914178 | LS on NID structure and length (C4-194332; contact: Ericsson) |
LS in source LS: C4-194332 LS To: RAN2, RAN3, CT1, CT3 |
CT4 | Vertical_LAN | Rel-16 |
R2-107 AI: 6.18.1 |
not treated | [WTS] [JSN] | |
R2-1914179 | [R2#107bis-offline-30] IAB LS on F1 over LTE |
discussion revision of R2-1913954 |
KDDI Corporation | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.2 |
noted | [WTS] [JSN] | |
R2-1914180 | Correction on ambiguity of UE FDD/TDD FR1/FR2 capabilities |
CR revision of R2-1912772 |
ZTE Corporation, Sanechips, China Southern Power Grid Co., Ltd | 38.306 15.7.0 CR#1721 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
not treated | [WTS] [JSN] |
R2-1914181 | CR on BWCS for inter-ENDC BC with intra-ENDC BC (38.331) | CR | Huawei, HiSilicon | 38.331 15.7.0 CR#1349 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
postponed | [WTS] [JSN] |
R2-1914182 | BWCS for inter-ENDC BC with intra-ENDC BC | CR | Huawei, HiSilicon | 38.306 15.7.0 CR#195 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
postponed | [WTS] [JSN] |
R2-1914183 | LS on PDCCH-based Power Saving Signal/Channel carrying indication of UE wakeup before DRX ON (R1-1911475; contact; CATT) |
LS in LS To: RAN2 |
RAN1 | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.1 |
noted | [WTS] [JSN] | |
R2-1914184 | Introduction of B1C signal in BDS system in A-GNSS |
CR revision of R2-1912204 |
CATT, CAICT, CMCC, China Telecom, China Unicom, Huawei, ZTE Corporation, MediaTek Inc | 36.355 15.5.0 CR#2441 catB | TEI16 | Rel-16 |
R2-107 AI: 6.20.1 |
endorsed | [WTS] [JSN] |
R2-1914185 | [DRAFT] LS to SA2 on reference time delivery |
LS out LS To: SA2 revised to R2-1914213 |
Ericsson | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.1 |
revised | [WTS] [JSN] | |
R2-1914186 | [RAN2#107bis Offline-031]: IAB routing and bearer mapping config | discussion | Qualcomm Inc |
R2-107 AI: 6.1.3 |
noted | [WTS] [JSN] | |||
R2-1914187 | [DRAFT] LS to RAN1 on LCP restriction for dynamic grant |
LS out LS To: RAN1 revised to R2-1914214 |
Qualcomm | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
revised | [WTS] [JSN] | |
R2-1914188 | Running CR for 38.331 on CA/DC Enhancements |
draftCR revision of R2-1912538 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1914189 | Running CR for 36.331 for CA/DC Enhancements |
draftCR revision of R2-1912539 |
Ericsson | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.1 |
endorsed | [WTS] [JSN] | |
R2-1914190 | Corrections to power limitations in NE-DC |
CR revision of R2-1913300 |
Ericsson | 38.331 15.7.0 CR#13031 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.4 |
merged | [WTS] [JSN] |
R2-1914191 | LS on differentiating between MSG2 and MSGB |
LS out LS To: RAN1 revision of R2-1914067 |
RAN2 | NR_2step_RACH-Core | Rel-16 |
R2-107 AI: 6.13.2 |
approved | [WTS] [JSN] | |
R2-1914192 | LS on UE adaptation to maximum number of MIMO layers (R1-1911528; contact: vivo) |
LS in source LS: R1-1911528 LS To: RAN2 |
RAN1 | NR_UE_pow_sav-Core | Rel-16 |
R2-107 AI: 6.11.1 |
noted | [WTS] [JSN] | |
R2-1914193 | Miscellaneous corrections on UE capability fields |
CR revision of R2-1913447 revised to R2-1914577 |
Intel Corporation, NTT DoCoMo | 38.306 15.7.0 CR#1861 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
agreed | [WTS] [JSN] |
R2-1914194 | TP on NTN Mobility Issues and Solutions |
pCR revision of R2-1913605 |
InterDigital | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
agreed | [WTS] [JSN] |
R2-1914195 | Ephemeris data |
pCR revision of R2-1912597 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
not treated | [WTS] [JSN] |
R2-1914196 | Report of email discussion [107#63][NR/NTN] |
pCR revision of R2-1912701 |
Ericsson | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.1 |
agreed | [WTS] [JSN] |
R2-1914197 | Further consideration on HARQ configuration in NTN |
discussion revision of R2-1913975 |
CMCC,Huawei,HiSilicon,Sony,KT Corp. | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
noted | [WTS] [JSN] | |
R2-1914198 | TP on HARQ configuration in NTN | pCR | CMCC, Nomor Research GmbH, Huawei, HiSilicon, Sony, KT Corp., NEC, Oppo, Nokia, ZTE, Ericsson, ETRI | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.3.1 |
agreed | [WTS] [JSN] |
R2-1914199 | TP on tracking area management in NTN | pCR | ZTE Corporation, Sanechips, Huawei, Ericsson, LG, CATT, OPPO, Hughes | 38.821 0.8.0 | FS_NR_NTN_solutions | Rel-16 |
R2-107 AI: 6.6.4.2 |
merged | [WTS] [JSN] |
R2-1914200 | LS to RAN1 on CSI/SRS reporting |
LS out LS To: RAN1 LS reply in R1-1912928, R1-1911995, R1-1912094, R1-1912140, R1-1913475, R1-1913480 revision of R2-1914061 |
RAN2 | NR_UE_pow_sav | Rel-16 |
R2-107 AI: 6.11.2 |
approved | [WTS] [JSN] | |
R2-1914201 | Reply LS on potential improvements for delay critical QoS flows |
LS out LS is reply to S2-1906832 LS To: SA2 revision of R2-1913725 |
RAN2 | 5GS_Ph1, TEI16 | Rel-16 |
R2-107 AI: 6.19 |
approved | [WTS] [JSN] | |
R2-1914202 | [DRAFT] Reply LS to SA3 on FBS detection |
LS out LS is reply to S3-193175 LS To: SA3 revision of R2-1913739 revised to R2-1914224 |
Huawei, HiSilicon | FS_5GFBS | Rel-16 |
R2-107 AI: 6.19 |
revised | [WTS] [JSN] | |
R2-1914203 | Inclusion of 90MHz UE Bandwidth |
CR revision of R2-1912653 |
Vodafone | 38.306 15.7.0 CR#1711 catC | NR_newRAT-Core, TEI16 | Rel-16 |
R2-107 AI: 6.20.3 |
agreed | [WTS] [JSN] |
R2-1914204 | [CR on adding CSI-RS inter-node message] | CR | Huawei | 38.331 15.7.0 CR#1350 catF | TEI16 | Rel-16 |
R2-107 AI: 6.20.3 |
reserved | [WTS] [JSN] |
R2-1914205 | Skipping supportedBandCombinationList of n90 |
CR revision of R2-1913667 revised to R2-1915029 |
KDDI Corporation | 38.306 15.7.0 CR#1891 catC | NR_n41_LTE_41_coex | Rel-16 |
R2-107 AI: 6.19 |
postponed | [WTS] [JSN] |
R2-1914206 | LS on NR IAB case-1 timing (R1-1911548; contact: ZTE) |
LS in source LS: R1-1911548 LS To: RAN2 |
RAN1 | NR_IAB-Core | Rel-16 |
R2-107 AI: 6.1.1 |
not treated | [WTS] [JSN] | |
R2-1914207 | Reply LS on single PDCCH-based multi-TRP operation (R1-1911550; contact: Huawei) |
LS in source LS: R1-1911550 LS To: RAN2 |
RAN1 | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.1 |
noted | [WTS] [JSN] | |
R2-1914208 | Reply LS on MAC CE design for SCell BFR (R1-1911587; contact: Apple) |
LS in source LS: R1-1911587 LS To: RAN2 |
RAN1 | NR_eMIMO-Core | Rel-16 |
R2-107 AI: 6.16.1 |
noted | [WTS] [JSN] | |
R2-1914209 | Correction on the frequency indication in SIB2 |
CR revision of R2-1913279 revised to R2-1914662 |
Huawei, HiSilicon, Ericsson, MediaTek | 38.331 15.7.0 CR#12961 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.6 |
agreed | [WTS] [JSN] |
R2-1914210 | [DRAFT] LS on direct SCell activation in RRC resume message |
LS out LS To: RAN4 revised to R2-1914216 |
Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
revised | [WTS] [JSN] | |
R2-1914211 | Report of offline discussion 020 on Correction of UE assistance information | report | Samsung | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.11 |
noted | [WTS] [JSN] | |
R2-1914212 | Report of offline discussion 040 on Signaling options for early measurement configuration | report | Samsung | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.3 |
noted | [WTS] [JSN] | |
R2-1914213 | LS to SA2 on reference time delivery |
LS out LS To: SA2 revision of R2-1914185 |
RAN2 | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.1 |
approved | [WTS] [JSN] | |
R2-1914214 | LCP restriction for Dynamic Grant |
LS out LS To: RAN1 LS reply in R1-1912927, R1-1913420, R1-1913565, R1-1913591 revision of R2-1914187 |
RAN2 | NR_IIOT-Core | Rel-16 |
R2-107 AI: 6.7.2.2.2 |
approved | [WTS] [JSN] | |
R2-1914215 | [DRAFT] LS on granularity of periodicity and burst arrival time in TSCAI |
LS out LS To: RAN3 revision of R2-1913636 revised to R2-1914223 |
Qualcomm Incorporated | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.3 |
revised | [WTS] [JSN] | |
R2-1914216 | [DRAFT] LS on direct SCell activation in RRC resume message |
LS out LS To: RAN4 revision of R2-1914210 revised to R2-1914217 |
Qualcomm Incorporated | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
revised | [WTS] [JSN] | |
R2-1914217 | LS on direct Scell activation in RRC resume message |
LS out LS To: RAN4 LS reply in R4-1914741, R4-1915242, R4-1915844 revision of R2-1914216 revised to R2-1914227 |
RAN2 | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
revised | [WTS] [JSN] | |
R2-1914218 | Reply LS on full configuration during SN Modification procedure |
LS out LS is reply to R2-1912033 LS To: RAN3 revision of R2-1914164 revised to R2-1914228 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
revised | [WTS] [JSN] | |
R2-1914219 | Clarifying the alignment of capability filtering across LTE and NR in MR-DC |
CR revision of R2-1913023 revised to R2-1915506 |
Nokia, Nokia Shanghai Bell | 38.331 15.7.0 CR#12831 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.5.2 |
agreed | [WTS] [JSN] |
R2-1914220 | [DRAFT] LS on BCS reporting for EN-DC BC |
LS out LS To: RAN4 revised to R2-1914226 |
Huawei | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
revised | [WTS] [JSN] | |
R2-1914221 | Reply LS to RAN1 on SFTD measurement |
LS out LS is reply to R1-1909819 LS To: RAN1 revision of R2-1914162 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.4 |
approved | [WTS] [JSN] | |
R2-1914222 | Reply LS on FR2 Pmax |
LS out LS To: RAN4 revision of R2-1914170 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.5.1 |
approved | [WTS] [JSN] | |
R2-1914223 | Granularity of periodicity and burst arrival time in TSCAI |
LS out LS To: RAN3 revision of R2-1914215 |
RAN2 | NR_IIOT | Rel-16 |
R2-107 AI: 6.7.2.2.3 |
approved | [WTS] [JSN] | |
R2-1914224 | Reply LS to SA3 on FBS detection |
LS out LS is reply to S3-193175 LS To: SA3 LS reply in S3-194206, S3-201023 revision of R2-1914202 |
RAN2 | FS_5GFBS | Rel-16 |
R2-107 AI: 6.19 |
approved | [WTS] [JSN] | |
R2-1914225 | Security Algorithms for Radio Bearers |
CR revision of R2-1914130 revised to R2-1916262 |
Qualcomm Incorporated | 38.331 15.7.0 CR#13323 catF | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.3.8 |
agreed | [WTS] [JSN] |
R2-1914226 | LS on BCS reporting for EN-DC B |
LS out LS To: RAN4 LS reply in R4-1915358, R4-1916031 revision of R2-1914220 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.4 |
approved | [WTS] [JSN] | |
R2-1914227 | LS on direct Scell activation in RRC resume message |
LS out LS To: RAN4 LS reply in R4-1913388 revision of R2-1914217 |
RAN2 | LTE_NR_DC_CA_enh-Core | Rel-16 |
R2-107 AI: 6.10.4.3 |
approved | [WTS] [JSN] | |
R2-1914228 | Reply LS on full configuration during SN Modification procedure |
LS out LS is reply to R2-1912033 LS To: RAN3 revision of R2-1914218 |
RAN2 | NR_newRAT-Core | Rel-15 |
R2-107 AI: 5.4.1.9 |
approved | [WTS] [JSN] |
2229 documents (1.1135849952698 seconds)