Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1803570 | Draft Agenda of RAN1#92bis meeting | agenda | RAN1 Chair |
R1-92 AI: 2 |
approved | [WTS] [JSN] | |||
R1-1803571 | Report of RAN1#92 meeting | report | ETSI |
R1-92 AI: 4 |
approved | [WTS] [JSN] | |||
R1-1803572 | Highlights from RAN#79 | other | RAN1 Chair |
R1-92 AI: 3 |
noted | [WTS] [JSN] | |||
R1-1803573 | Reply LS to RAN1 on wake-up signal |
LS in source LS: R2-1803798 LS To: RAN1 LS reply in R1-1719207 |
RAN2, Huawei | NB_IOTenh2-Core, LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803574 | LS on LTE peak data-rate calculation for EN-DC |
LS in source LS: R2-1803950 LS To: RAN1 |
RAN2, Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803575 | LS on messagePowerOffsetGroupB |
LS in source LS: R2-1803860 LS To: RAN1 |
RAN2, Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803576 | LS response to RAN1 on NR MIMO MAC CE |
LS in LS is reply to R1-1801272 source LS: R2-1803872 LS To: RAN1 |
RAN2, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803577 | LS to RAN1 on Beam- and Cell- Radio-Link-Monitoring |
LS in source LS: R2-1804066 LS To: RAN1 |
RAN2, Nokia | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803578 | Reply to LS on eV2X evaluation methodology |
LS in LS is reply to R1-1719239 source LS: S-180039 LS To: RAN1 |
5GAA WG4, Intel | FS_LTE_NR_V2X_eval | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803579 | LS to RAN1 on handling parallel RA procedure and SR procedure |
LS in source LS: R2-1803856 LS To: RAN1 |
RAN2, AsusTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803580 | Reply LS on HARQ-ACK feedback for efeMTC |
LS in LS is reply to R1-1721254 source LS: R2-1803886 LS To: RAN1 |
RAN2, Qualcomm | LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803581 | LS on maximum number of CCs for NR CA |
LS in source LS: R2-1804052 LS To: RAN1 |
RAN2, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803582 | LS on Message 3 size for NR |
LS in source LS: R2-1804073 LS To: RAN1 |
RAN2, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803583 | Reply LS on required information for NSA on X2 |
LS in LS is reply to R3-174964 source LS: R2-1804074 LS To: RAN3 |
RAN2, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
noted | [WTS] [JSN] | |
R1-1803584 | LS on Frequency Band list |
LS in LS is reply to R4-1714295 source LS: R2-1804075 LS To: RAN1, RAN3, RAN4 |
RAN2, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803585 | LS on RAN2 agreements for LTE URLLC |
LS in source LS: R2-1804084 LS To: RAN1 |
RAN2, Ericsson | LTE_HRLLC-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803586 | Response LS on Maximum TBS for PDSCH containing RMSI/OSI/Paging |
LS in LS is reply to R1-1803375 source LS: R2-1804098 LS To: RAN1 |
RAN2, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803587 | LS on UL timing difference in EN-DC |
LS in source LS: R2-1804102 LS To: RAN4 |
RAN2, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
noted | [WTS] [JSN] | |
R1-1803588 | Reply LS on SI reception in BWP |
LS in source LS: R2-1804109 LS To: RAN1 |
RAN2, LG Electronics | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803589 | LS on RAN2 agreements for euCA |
LS in source LS: R2-1804137 LS To: RAN1, RAN4 |
RAN2, Nokia | LTE_euCA-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803590 | LS on UE measurements for demodulation test setup in FR2 |
LS in source LS: R4-1801809 LS To: RAN1, RAN5 |
RAN4, Intel | FS_NR_test_methods | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803591 | Reply LS on clarification in MAC |
LS in LS is reply to R2-1801569 source LS: R4-1802690 LS To: RAN2 |
RAN4, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
noted | [WTS] [JSN] | |
R1-1803592 | LS reply on UE RF related parameters, capabilities and features for NR standalone |
LS in LS is reply to R2-1712028 source LS: R4-1802708 LS To: RAN2 |
RAN4, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
noted | [WTS] [JSN] | |
R1-1803593 | LS reply on UE baseband processing capability |
LS in LS is reply to R2-1712078 source LS: R4-1803122 LS To: RAN2 |
RAN4, Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
noted | [WTS] [JSN] | |
R1-1803594 | Reply LS on NR Idle Mode Measurements |
LS in LS is reply to R2-1801658 source LS: R4-1803276 LS To: RAN2 |
RAN4, CMCC | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
noted | [WTS] [JSN] | |
R1-1803595 | LS reply to RAN1 on P_0 ranges on UL power control |
LS in LS is reply to R1-1721608 source LS: R4-1803466 LS To: RAN1, RAN2 |
RAN4, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803596 | LS on NR UE feature list |
LS in source LS: RP-180596 LS To: RAN1, RAN2, RAN4 |
RAN, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803597 | LS on Summary of email discussion “[ITU-R AH 01] Calibration for self-evaluation” |
LS in source LS: RT-180011 LS To: RAN, RAN1, RAN2, RAN4 |
ITU-R Ad-Hoc, Huawei | FS_5G_eval | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803598 | LS on NSSS based NRSRP measurement definition |
LS in source LS: R4-1802788 LS To: RAN1 |
RAN4, Nokia | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803599 | LS on EARFCN provisioning for Release 15 MTC and Release 15 NB-IOT UE |
LS in source LS: R4-1803078 LS To: RAN2 |
RAN4, Qualcomm | NB_IOTenh2-Core, LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 5 |
noted | [WTS] [JSN] | |
R1-1803600 | LS on SFTD measurement before EN-DC |
LS in source LS: R4-1803174 LS To: RAN1 |
RAN4, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803601 | LS on PA EVM for pi/2 BPSK and DMRS |
LS in source LS: R4-1803265 LS To: RAN1 |
RAN4, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803602 | LS on BWP switching delay |
LS in source LS: R4-1803283 LS To: RAN1 |
RAN4, Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803603 | Reply LS on NR SS Raster Shift for Frequency Range 0-2700MHz |
LS in LS is reply to R1-1801182 source LS: R4-1803441 LS To: RAN1, RAN2 |
RAN4, ZTE | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803604 | LS on UE feature list |
LS in source LS: R4-1803564 LS To: RAN1, RAN2 |
RAN4, NTT DOCOMO, Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1803605 | Acquisition of N_(TA_Offset) for Uplink Transmission |
LS in source LS: R4-1803570 LS To: RAN2 |
RAN4, Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
noted | [WTS] [JSN] | |
R1-1803606 | Remaining details of Synchronization Signal Design | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1803607 | Remaining details of NR-PBCH Design | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1803608 | Remaining details of RMSI | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1803609 | Remaining details of PRACH Resource Configuration | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1803610 | Remaining details of RACH procedure | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1803611 | Remaining details of RRM measurements | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1803612 | Remaining details of RLM | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1803613 | Text proposal for LLS parameters in TR 38.812 (NOMA) | discussion | ZTE, Sanechips |
R1-92 AI: 7.4 |
endorsed | [WTS] [JSN] | |||
R1-1803614 | Updated work plan for Rel-15 SI on NR NOMA | discussion | ZTE, Sanechips |
R1-92 AI: 7.4 |
noted | [WTS] [JSN] | |||
R1-1803615 | Key processing modules at transmitter side for NOMA | discussion | ZTE, Sanechips |
R1-92 AI: 7.4.1 |
noted | [WTS] [JSN] | |||
R1-1803616 | Typical multi-user receivers for NOMA | discussion | ZTE, Sanechips |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1803617 | Procedures related to NOMA | discussion | ZTE, Sanechips |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1803618 | System-level evaluation methodology and assumptions for NOMA | discussion | ZTE, Sanechips |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1803619 | Channel estimation error modeling for NOMA receiver | discussion | ZTE, Sanechips |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1803620 | Summary of offline email discussion on Tx side processing and receiver types for clarification |
discussion revised to R1-1805535 |
ZTE, Sanechips |
R1-92 AI: 7.4.5 |
revised | [WTS] [JSN] | |||
R1-1803621 | Summary of offline email discussion on system-level evaluation methodology and assumptions for NOMA |
discussion revised to R1-1805536 |
ZTE, Sanechips |
R1-92 AI: 7.4.5 |
revised | [WTS] [JSN] | |||
R1-1803622 | Remaining issues on beam failure recovery | discussion | NEC | FS_NR_newRAT | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |
R1-1803623 | Remaining issues on PTRS configurations | discussion | NEC | FS_NR_newRAT | Rel-15 |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |
R1-1803624 | Discusses on waveform and bandwidth of NR-U | discussion | NEC | FS_NR_newRAT | Rel-15 |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |
R1-1803625 | Remaining details on synchronization signal | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1803626 | Remaining details of NR PBCH design | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1803627 | Remaining on RMSI configurations | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1803628 | Remaining details of RACH Preambles | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1803629 | Remaining details of RACH Procedures | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1803630 | Remaining details on NR RRM | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1803631 | Remaining details on NR RLM | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1803632 | Remaining issues on CW mapping | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1803633 | Summary of remaining issues for UL non-codebook based transmission | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1803634 | Summary of remaining issues on CSI measurement | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1803635 | Summary of remaining issues on CSI reporting | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1803636 | Remaining issue for beam management | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1803637 | Summary of remaining issues on beam failure recovery | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1803638 | Remaining details on CSI-RS design in NR | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1803639 | Remaining details of SRS design | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1803640 | Remaining issues and TP for QCL assumptions | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.7 |
available | [WTS] [JSN] | |||
R1-1803641 | Remaining details of UL power control design | other | Huawei, HiSilicon |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1803642 | Remaining issues on search space | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1803643 | Remaining issues on group-common PDCCH | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1803644 | Remaining issues on PUCCH structure in short-duration | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1803645 | Remaining issues on PUCCH structure in long-duration | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1803646 | Remaining issues on UCI multiplexing | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1803647 | Remaining issues on resource allocation for PUCCH | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1803648 | Discussion on UE peak data rate | other | Huawei, HiSilicon |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1803649 | Draft reply LS on NR UE peak data rate | other | Huawei, HiSilicon |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1803650 | On RMSI PRB grid | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.6 |
available | [WTS] [JSN] | |||
R1-1803651 | On k0 for OFDM signal generation | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.6 |
available | [WTS] [JSN] | |||
R1-1803652 | Discussion and TP on slot format for ECP | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1803653 | Remaining issues on bandwidth part and wideband operation | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1803654 | Remaining issues on reserved resources and rate-matching | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.5 |
available | [WTS] [JSN] | |||
R1-1803655 | Remaining issues on NR CA | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1803656 | Discussion on remaining issues for SUL and EN-DC | other | Huawei, HiSilicon |
R1-92 AI: 7.1.5 |
noted | [WTS] [JSN] | |||
R1-1803657 | Compact DCI for URLLC | other | Huawei, HiSilicon |
R1-92 AI: 7.2.2 |
noted | [WTS] [JSN] | |||
R1-1803658 | PDCCH repetition for URLLC | other | Huawei, HiSilicon |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1803659 | UL multiplexing between URLLC and eMBB | other | Huawei, HiSilicon |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1803660 | PDSCH reliability for URLLC | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803661 | MCS/CQI design for URLLC | other | Huawei, HiSilicon |
R1-92 AI: 7.2.1 |
noted | [WTS] [JSN] | |||
R1-1803662 | Summary of remaining issues on pre-emption indication with TP | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1803663 | Discussion on the design of SCMA | other | Huawei, HiSilicon |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1803664 | Discussion on the design of NoMA receiver | other | Huawei, HiSilicon |
R1-92 AI: 7.4.2 |
noted | [WTS] [JSN] | |||
R1-1803665 | Preliminary LLS evaluation results for mMTC scenario | other | Huawei, HiSilicon |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1803666 | Preliminary LLS evaluation results for URLLC scenario | other | Huawei, HiSilicon |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1803667 | Preliminary LLS evaluation results for eMBB scenario | other | Huawei, HiSilicon |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1803668 | Discussion on LLS and SLS evaluation metrics and parameters | other | Huawei, HiSilicon |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1803669 | Discussion on NoMA related procedures | other | Huawei, HiSilicon |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1803670 | Three state V2X sidelink channel model |
other revised to R1-1805567 |
Huawei, HiSilicon, Spirent, Panasonic, Cohere Technologies, ITRI, Intel, InterDigital, CATT, NEC, Keysight, Qualcomm, ZTE, Sanechips, LGE, Fraunhofer HHI |
R1-92 AI: 7.5.2 |
revised | [WTS] [JSN] | |||
R1-1803671 | V2X sidelink channel model | other | Huawei, HiSilicon |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1803672 | On eV2X Evaluation Methodology | other | Huawei, HiSilicon |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1803673 | Consideration on GEO and LEO channel models | other | Huawei, HiSilicon |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1803674 | HAPS channel modeling | other | Huawei, HiSilicon |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1803675 | General considerations on NTN Channel Modeling | other | Huawei, HiSilicon |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R1-1803676 | Design princples of physcial channels on NR unlicensed band | other | Huawei, HiSilicon |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1803677 | Numerology and wideband operation in NR unlicensed | other | Huawei, HiSilicon |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803678 | NR frame structure and scheduling on unlicensed bands | other | Huawei, HiSilicon |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1803679 | Coexistence and channel access for NR unlicensed band operations | other | Huawei, HiSilicon |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1803680 | SSB/DRS in NR unlicensed | other | Huawei, HiSilicon |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803681 | Random access in NR unlicensed | other | Huawei, HiSilicon |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803682 | UCI transmission in NR unlicensed | other | Huawei, HiSilicon |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803683 | Consideration on evaluation features and parameters for IMT-2020 self evaluation | other | Huawei, HiSilicon |
R1-92 AI: 7.8.1 |
available | [WTS] [JSN] | |||
R1-1803684 | Initial evaluation results of eMBB spectral efficiency | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803685 | Consideration on self evaluation of IMT-2020 for user experienced data rate | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803686 | Consideration on self evaluation of IMT-2020 for area traffic capacity | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803687 | Consideration on self evaluation of IMT-2020 for high mobility | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803688 | Consideration on self evaluation of IMT-2020 for peak spectral efficiency and peak data rate | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803689 | Consideration on self evaluation of IMT-2020 for network energy efficiency | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803690 | Consideration on self evaluation of IMT-2020 for mMTC connection density | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803691 | Consideration on self evaluation of IMT-2020 for reliability | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803692 | Consideration on self evaluation of IMT-2020 for control plane latency | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803693 | Consideration on self evaluation of IMT-2020 for user plane latency | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803694 | Consideration on IAB evaluation methodology and parameters | other | Huawei, HiSilicon |
R1-92 AI: 7.7.2 |
available | [WTS] [JSN] | |||
R1-1803695 | Physical layer enhancement consideration on IAB | other | Huawei, HiSilicon |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1803696 | Ray Tracing simulation result for NTN | other | Huawei, HiSilicon |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1803697 | On the multipath propagation in satellite to UE link | other | Huawei, HiSilicon |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1803698 | Discussion on semi-static HARQ-ACK codebook for slot aggregation | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803699 | Draft reply LS on LTE peak data rate calculation for EN-DC |
LS out LS is reply to R2-1803950 LS To: RAN2 revised to R1-1805753 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
revised | [WTS] [JSN] | |
R1-1803700 | Remaining details of UL power control design for CA | other | Huawei, HiSilicon |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1803701 | QCL and spatial-relation for simultaneous reception and transmission | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1803702 | LS reply on maximum number of CCs for NR CA | discussion | Huawei, HiSilicon |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1803703 | Remaining issues on TA aspects | other | Huawei, HiSilicon |
R1-92 AI: 7.1.1.6 |
available | [WTS] [JSN] | |||
R1-1803704 | Remaining issues on RS multiplexing | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1803705 | Remaining issues on DMRS design | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1803706 | Remaining issues on PTRS | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1803707 | Remaining issues on DCI contents and format | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1803708 | DCI interpretation for different BWP | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1803709 | Remaining issues on resource allocation and TBS | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1803710 | Summary of remaining issues on PDCCH monitoring with TP | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1803711 | Blind/HARQ-less Repetition for Scheduled DL-SCH Operation |
other revised to R1-1805322 |
Huawei, HiSilicon |
R1-92 AI: 6.2.8.1 |
revised | [WTS] [JSN] | |||
R1-1803712 | Repetition Enhancements for UL SPS Operation | other | Huawei, HiSilicon |
R1-92 AI: 6.2.8.2 |
noted | [WTS] [JSN] | |||
R1-1803713 | Views on LTE Control Plane Latency Reduction | other | Huawei, HiSilicon |
R1-92 AI: 6.2.11 |
noted | [WTS] [JSN] | |||
R1-1803714 | Aspects related to DL control channel | discussion | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.2 |
noted | [WTS] [JSN] | |||
R1-1803715 | Additional DMRS position pattern for subslot #5 | other | Huawei, HiSilicon, Ericsson |
R1-92 AI: 6.2.1.2.5 |
noted | [WTS] [JSN] | |||
R1-1803716 | Aspects related to DL data channel | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.4 |
available | [WTS] [JSN] | |||
R1-1803717 | Aspects related to FS2 | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.6 |
available | [WTS] [JSN] | |||
R1-1803718 | Handling of collision between PRACH and sTTI | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.1 |
noted | [WTS] [JSN] | |||
R1-1803719 | Remaining issues on SPS | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.3 |
available | [WTS] [JSN] | |||
R1-1803720 | Aspects related to UL control channel | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.3 |
noted | [WTS] [JSN] | |||
R1-1803721 | Corrections on feCoMP |
discussion revised to R1-1805318 |
Huawei, HiSilicon |
R1-92 AI: 6.2.4.1 |
revised | [WTS] [JSN] | |||
R1-1803722 | Draft reply LS to RAN2 on beam- and cell- radio link monitoring | discussion | CATT |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1803723 | Remaining details on carrier aggregation for mode 4 in V2X phase 2 |
discussion revised to R1-1806262 |
CATT |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1803724 | Remaining details on synchronization for carrier aggregation in V2X Phase 2 | discussion | CATT |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1803725 | Discussion on 64QAM support in V2X phase 2 | discussion | CATT |
R1-92 AI: 6.2.5.2 |
available | [WTS] [JSN] | |||
R1-1803726 | Discussion on Tx diversity schemes in PC5 | discussion | CATT |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |||
R1-1803727 | Discussion on resource pool sharing between mode 3 and mode 4 |
discussion revision of R1-1801706 |
CATT |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1803728 | Discussion on latency reduction between packet arrival and resource selection |
discussion revision of R1-1801707 revised to R1-1806265 |
CATT |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1803729 | Remaining Issues on Synchronization Signal | discussion | CATT |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1803730 | Remaining Issues on RMSI | discussion | CATT |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1803731 | Summary of Offline Discussion on RMSI |
discussion revised to R1-1805600 |
CATT |
R1-92 AI: 7.1.1.2.2 |
revised | [WTS] [JSN] | |||
R1-1803732 | Further details on NR RACH format | discussion | CATT |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1803733 | Further details on NR 4-step RA Procedure | discussion | CATT |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1803734 | Remaining Issues on NR Mobility Management | discussion | CATT |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1803735 | Remaining Issues on NR Radio Link Monitoring | discussion | CATT |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1803736 | Remaining issues on codeword mapping | discussion | CATT |
R1-92 AI: 7.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1803737 | WF on codeword mapping | discussion | CATT |
R1-92 AI: 7.1.2.1.1 |
withdrawn | [WTS] [JSN] | |||
R1-1803738 | Remaining issues on codebook based UL transmission | discussion | CATT |
R1-92 AI: 7.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1803739 | Remaining issues on non-codebook based UL transmission | discussion | CATT |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1803740 | Remaining issues on PRB bundling | discussion | CATT |
R1-92 AI: 7.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1803741 | On multiplexing of signals and physical channels | discussion | CATT |
R1-92 AI: 7.1.2.2 |
available | [WTS] [JSN] | |||
R1-1803742 | Remaining issues on CSI measurement | discussion | CATT |
R1-92 AI: 7.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1803743 | Remaining issues on CSI reporting | discussion | CATT |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1803744 | Remaining issues on beam management | discussion | CATT |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1803745 | Remaining issues on beam failure recovery | discussion | CATT |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1803746 | Remaining issues on CSI-RS | discussion | CATT |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1803747 | Remaining issues on DMRS | discussion | CATT |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1803748 | Remaining issues on PT-RS | discussion | CATT |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1803749 | Remaining issues on SRS | discussion | CATT |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1803750 | Remaining issues on QCL | discussion | CATT |
R1-92 AI: 7.1.2.3.7 |
available | [WTS] [JSN] | |||
R1-1803751 | Remaining details of NR PDCCH search space | discussion | CATT |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1803752 | Open issues for semi-static and dynamic slot format indication | discussion | CATT |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1803753 | Open issues on DCI formats | discussion | CATT |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1803754 | On multiplexing of different UCI transmissions | discussion | CATT |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1803755 | Remaining aspects of UCI multiplexing on PUSCH | discussion | CATT |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1803756 | Remaining issues on PUCCH resource allocation | discussion | CATT |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1803757 | Remaining issues on PDSCH/PUSCH resource allocation | discussion | CATT |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1803758 | Remaining issues on NR HARQ timing | discussion | CATT |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1803759 | Corrections to CBG-based transmission | discussion | CATT |
R1-92 AI: 7.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1803760 | Remaining details of DL pre-emption indication |
discussion revision of R1-1801739 |
CATT |
R1-92 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1803761 | Corrections to BWP operation | discussion | CATT |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1803762 | Remaining issues on NR CA operation | discussion | CATT |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1803763 | Remaining issues of Non-CA based power control | discussion | CATT |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1803764 | Parameters setting on virtual PHR for CA | discussion | CATT |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1803765 | CQI and MCS design for NR URLLC |
discussion revision of R1-1801748 |
CATT |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1803766 | Necessity of a compact DCI format for NR URLLC |
discussion revision of R1-1801749 |
CATT |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1803767 | Discussion on enhanced PDCCH for NR URLLC |
discussion revision of R1-1801750 |
CATT |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1803768 | Multiplexing of UL transmissions of different reliability requirements |
discussion revision of R1-1801751 |
CATT |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1803769 | PUCCH enhancement for URLLC |
discussion revision of R1-1801752 revised to R1-1806294 |
CATT |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803770 | PDMA transmitter side signal processing |
discussion revision of R1-1801753 revised to R1-1806305 |
CATT |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1803771 | Discussion on PDMA receivers |
discussion revision of R1-1801754 revised to R1-1806306 |
CATT |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1803772 | Discussion on NOMA procedures |
discussion revision of R1-1801755 revised to R1-1806307 |
CATT |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1803773 | System evaluation assumptions for NOMA | discussion | CATT |
R1-92 AI: 7.4.4 |
noted | [WTS] [JSN] | |||
R1-1803774 | Link level evaluation results of PDMA |
discussion revised to R1-1806308 |
CATT |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1803775 | Discusion on evaluation scenarios of new V2X use cases |
discussion revision of R1-1801757 |
CATT |
R1-92 AI: 7.5.1 |
noted | [WTS] [JSN] | |||
R1-1803776 | Discussion on channel models of new V2X use cases |
discussion revision of R1-1801758 |
CATT |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1803777 | Remaining Issues of Simulation Methodology for NR Unlicensed operations | discussion | CATT |
R1-92 AI: 7.6.1 |
noted | [WTS] [JSN] | |||
R1-1803778 | Frame Structure for NR Unlicencensed Operations | discussion | CATT |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1803779 | Physical Channel Design for NR Unlicensed Operations | discussion | CATT |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1803780 | Physical Layer Procedures for NR Unlicensed Operations | discussion | CATT |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1803781 | Discussions on evaluation methodologies for link-level and system-level simulations | discussion | CATT |
R1-92 AI: 7.8.1 |
available | [WTS] [JSN] | |||
R1-1803782 | Discussions on detailed link budget evaluation methodology | discussion | CATT |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803783 | Discussions on calculation of shadow fading margin for link budget | discussion | CATT |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803784 | Discussions on penetration margin and SD for link budget | discussion | CATT |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803785 | Discussions on system level simulation configurations and technical features for self evaluation | discussion | CATT |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803786 | Initial self evaluation on peak data rate and peak spectrum efficiency | discussion | CATT |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803787 | Initial self evaluation for Indoor Hotspot-eMBB | discussion | CATT |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803788 | Initial self evaluation for Dense Urban-eMBB | discussion | CATT |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803789 | Initial self evaluation for Rural-eMBB | discussion | CATT |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1803790 | PDCCH structure remaining issues | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.3.1.1 |
available | [WTS] [JSN] | |||
R1-1803791 | Search space design and related issues |
discussion revised to R1-1805263 |
ZTE, Sanechips |
R1-92 AI: 7.1.3.1.2 |
revised | [WTS] [JSN] | |||
R1-1803792 | Remaining issues for slot format | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1803793 | Remaining issues on DCI content | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1803794 | Remaining issues on short PUCCH | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1803795 | Issues related to Long PUCCH |
discussion revised to R1-1805262 |
ZTE, Sanechips |
R1-92 AI: 7.1.3.2.2 |
revised | [WTS] [JSN] | |||
R1-1803796 | Remaining issues for data resource allocation | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1803797 | Remaining issues for UL data transmission procedure | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |||
R1-1803798 | Issues for scell BWP | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1803799 | Remaining aspects for rate matching | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.3.5 |
available | [WTS] [JSN] | |||
R1-1803800 | Considerations on CQI /MCS table(s) and related aspects for URLLC |
discussion revised to R1-1805515 |
ZTE, Sanechips |
R1-92 AI: 7.2.1 |
revised | [WTS] [JSN] | |||
R1-1803801 | NR compact DCI format for URLLC | discussion | ZTE, Sanechips |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1803802 | Discussion on PDCCH repetition for URLLC | discussion | ZTE, Sanechips |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1803803 | UL multiplexing of transmissions with different reliability requirements | discussion | ZTE, Sanechips |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1803804 | Remaining aspects on wake-up signals for efeMTC | discussion | vivo |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1803805 | Remaining aspects on wake-up signals for feNB-IoT | discussion | vivo |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | |||
R1-1803806 | Remaining issues on synchronization signal | discussion | vivo |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1803807 | Remaining aspects on NR-PBCH | discussion | vivo |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1803808 | Discussion on Remaining Minimum System Information | discussion | vivo |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1803809 | Remaining issues on RACH procedure | discussion | vivo |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1803810 | Remaining issues on RRM measurement | discussion | vivo |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1803811 | Remaining issues on layer mapping | discussion | vivo |
R1-92 AI: 7.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1803812 | Remaining issues on codebook based UL transmission | discussion | vivo |
R1-92 AI: 7.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1803813 | Remaining issues on non-codebook based UL transmission | discussion | vivo |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1803814 | Remaining issues on PRB bundling | discussion | vivo |
R1-92 AI: 7.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1803815 | Remaining issues on CSI measurement | discussion | vivo |
R1-92 AI: 7.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1803816 | Remaining issues on CSI reporting | discussion | vivo |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1803817 | Remaining issues on beam measurement and reporting | discussion | vivo |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1803818 | Remaining issues on mechanism to recover from beam failure | discussion | vivo |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1803819 | Remaining issues for CQI and MCS | discussion | vivo |
R1-92 AI: 7.1.2.2.5 |
available | [WTS] [JSN] | |||
R1-1803820 | Remaining issues on simultaneous reception of DL/UL physical channels and reference signals | discussion | vivo |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1803821 | Remaining issues on multiplexing of different types of RSs | discussion | vivo |
R1-92 AI: 7.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1803822 | Remaining issues on CSI-RS | discussion | vivo |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1803823 | Remaining issues on DMRS | discussion | vivo |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1803824 | Remaining issues on PT-RS | discussion | vivo |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1803825 | Remaining issues on SRS | discussion | vivo |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1803826 | Remaining issues on TRS | discussion | vivo |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1803827 | Remaining issues on QCL | discussion | vivo |
R1-92 AI: 7.1.2.3.7 |
available | [WTS] [JSN] | |||
R1-1803828 | Remaining issues on PDCCH search space | discussion | vivo |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1803829 | Remaining issues on GC-PDCCH | discussion | vivo |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1803830 | Remaining issues on DCI formats | discussion | vivo |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1803831 | On compact DCI | discussion | vivo |
R1-92 AI: 7.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1803832 | Remaining issues on PUCCH with short-duration | discussion | vivo |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1803833 | Remaining issues on PUCCH with long-duration | discussion | vivo |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1803834 | Remaining issues on UCI multiplexing | discussion | vivo |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1803835 | Remaining issues PUCCH resource allocation | discussion | vivo |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1803836 | Remaining issues on resource allocation | discussion | vivo |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1803837 | Remaining issues on HARQ management | discussion | vivo |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1803838 | Remaining issues on UL data transmission procedure | discussion | vivo |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |||
R1-1803839 | Remaining issues on Multiplexing data with different transmission durations | discussion | vivo |
R1-92 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1803840 | Remaining issues on BWP operation | discussion | vivo |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1803841 | Other aspects on carrier aggregation | discussion | vivo |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1803842 | Remaining issues on non-CA UL power control | discussion | vivo |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1803843 | Remaining issues on CA UL power control | discussion | vivo |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1803844 | Discussion on Rel-15 NR UE features | discussion | vivo |
R1-92 AI: 7.1.7 |
available | [WTS] [JSN] | |||
R1-1803845 | Discussion on CSI report for URLLC | discussion | vivo |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1803846 | Discussion on compact DCI for URLLC | discussion | vivo |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1803847 | Discussion on PDCCH repetition for URLLC | discussion | vivo |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1803848 | Discussion on handling UL multiplexing of transmissions with different reliability requirements | discussion | vivo |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1803849 | Other aspects for URLLC | discussion | vivo |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803850 | Discussion on NOMA transmitters | discussion | vivo |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1803851 | Receiver design considerations for NOMA | discussion | vivo |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1803852 | Discussion on NOMA procedures | discussion | vivo |
R1-92 AI: 7.4.3 |
noted | [WTS] [JSN] | |||
R1-1803853 | Evaluations for NOMA | discussion | vivo |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1803854 | Discussion on eV2X evaluation scenarios | discussion | vivo |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1803855 | Frame structure for NR-U operation | discussion | vivo |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1803856 | Discussion on physical layer channel design in unlicensed spectrum | discussion | vivo |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1803857 | Discussion on the channel access procedures | discussion | vivo |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1803858 | Design considerations for standalone operation in NR unlicensed spectrum | discussion | vivo |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803859 | Measurement results and analysis on UE power consumption | discussion | vivo |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1803860 | NR UE power saving | discussion | vivo |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1803861 | Corrections to sTTI and SPT implementation | CR | Ericsson | 36.211 15.1.0 CR#428 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
revised | [WTS] [JSN] |
R1-1803862 | Introduction of PUSCH sub-PRB allocation |
draftCR revised to R1-1805173 |
Ericsson | LTE_feMTC-Core | Rel-15 |
R1-92 AI: 6.2.6 |
revised | [WTS] [JSN] | |
R1-1803863 | Introduction Rel-15 Further NB-IoT enhancements |
draftCR revised to R1-1805174 |
Ericsson | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 6.2.7 |
revised | [WTS] [JSN] | |
R1-1803864 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE |
draftCR revised to R1-1805172 |
Ericsson | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
revised | [WTS] [JSN] | |
R1-1803865 | Draft CR to 38.211 | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
noted | [WTS] [JSN] | |
R1-1803866 | On functions of power saving signal | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.1.1.1 |
available | [WTS] [JSN] | ||
R1-1803867 | On configurations and procedures of power saving signal | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | ||
R1-1803868 | On detailed design and evaluations of power saving signal | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.1.1.3 |
available | [WTS] [JSN] | ||
R1-1803869 | Design for physical layer scheduling request | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | ||
R1-1803870 | On support of semi-persistent scheduling | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | ||
R1-1803871 | Early data transmission in RACH for NB-IoT | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.1.2 |
noted | [WTS] [JSN] | ||
R1-1803872 | Common aspects for TDD NB-IoT | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.6.1 |
available | [WTS] [JSN] | ||
R1-1803873 | On downlink TDD NB-IoT | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | ||
R1-1803874 | On uplink TDD NB-IoT | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.6.3 |
available | [WTS] [JSN] | ||
R1-1803875 | Remaining details of NB-IoT measurements improvement | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.3 |
available | [WTS] [JSN] | ||
R1-1803876 | On the support of NB-IoT small cell |
other revised to R1-1805973 |
Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.4 |
available | [WTS] [JSN] | ||
R1-1803877 | Reduction of NB-IoT synchronization time | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.2.1 |
available | [WTS] [JSN] | ||
R1-1803878 | Reduction of NB-IoT system information acquisition time | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.2.2 |
available | [WTS] [JSN] | ||
R1-1803879 | NPRACH enhancement for cell radius extension | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.5.2 |
noted | [WTS] [JSN] | ||
R1-1803880 | On NPRACH false alarm reduction due to inter-cell interference | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7.5.1 |
available | [WTS] [JSN] | ||
R1-1803881 | On NPUSCH uplink compensation gaps for 2 HARQ processes | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | ||
R1-1803882 | List of L1 parameters for further enhancements of NB-IoT | discussion | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.2.7 |
noted | [WTS] [JSN] | ||
R1-1803883 | Cell search and system information acquisition improvements in eFeMTC | other | Huawei, HiSilicon | LTE_eMTC4-Core |
R1-92 AI: 6.2.6.1 |
available | [WTS] [JSN] | ||
R1-1803884 | Early data transmission for eFeMTC | other | Huawei, HiSilicon | LTE_eMTC4-Core |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | ||
R1-1803885 | On 'wake-up signal' for eFeMTC | other | Huawei, HiSilicon | LTE_eMTC4-Core |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | ||
R1-1803886 | Further considerations on HARQ-ACK feedback for PUSCH in eFeMTC | other | Huawei, HiSilicon | LTE_eMTC4-Core |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | ||
R1-1803887 | On Sub-RB resource allocation for MTC PUSCH | other | Huawei, HiSilicon | LTE_eMTC4-Core |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | ||
R1-1803888 | On more flexible starting PRB for PDSCH/PUSCH resource allocation | other | Huawei, HiSilicon | LTE_eMTC4-Core |
R1-92 AI: 6.2.6.6 |
available | [WTS] [JSN] | ||
R1-1803889 | Uplink Power control for aerial UEs | other | Huawei, HiSilicon | LTE_Aerial |
R1-92 AI: 6.2.9.1 |
available | [WTS] [JSN] | ||
R1-1803890 | Remaining issues for resource selection in mode 4 CA | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1803891 | Remaining issues for synchronization in Sidelink CA | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1803892 | Discussion on transmit diversity for PC5 | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |||
R1-1803893 | Evaluation results of TxD | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.5.3.2 |
available | [WTS] [JSN] | |||
R1-1803894 | Support for 64 QAM | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.5.2 |
available | [WTS] [JSN] | |||
R1-1803895 | Resource pool sharing between mode 3 and mode 4 | discussion | ZTE , Sanechips |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1803896 | Consideration for maximum time reduction between packet arrival at layer 1 and resource selection for transmission | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1803897 | NR eV2X evaluation methodology | discussion | ZTE, Sanechips |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1803898 | Consideration of Blockage in eV2X Channel Modeling | discussion | ZTE, Sanechips |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1803899 | NR eV2X link level simulation assumptions | discussion | ZTE , Sanechips |
R1-92 AI: 7.5.3 |
available | [WTS] [JSN] | |||
R1-1803900 | Underlay SR: a complementary solution to overcome the limitations of periodic PUCCH-SR |
other revision of R1-1801597 revised to R1-1805824 |
Idaho National Laboratory | FS_NR_newRAT | Rel-15 |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |
R1-1803901 | Corrections for shortened processing time and shortened TTI in 36.213, s00-s05 | CR | Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1049 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
revised | [WTS] [JSN] |
R1-1803902 | Corrections for shortened processing time and shortened TTI in 36.213, s06-s09 | CR | Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1050 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
revised | [WTS] [JSN] |
R1-1803903 | Corrections for shortened processing time and shortened TTI in 36.213, s10-s13 | CR | Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1051 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
revised | [WTS] [JSN] |
R1-1803904 | Corrections for shortened processing time and shortened TTI in 36.213, s14-xx | CR | Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1052 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
revised | [WTS] [JSN] |
R1-1803905 | Remaining issues on non-codebook based UL transmission | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1803906 | Remaining issues on PRB bundling | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1803907 | Remaining issues on CSI measurement | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1803908 | Remaining issues on beam management | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1803909 | Remaining issues on beam recovery | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.2.4 |
noted | [WTS] [JSN] | |||
R1-1803910 | Simultaneous transmission and reception of channels/signals | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1803911 | Remaining issues on DMRS | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1803912 | Remaining issues on PT-RS | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1803913 | Remaining issues on SRS | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1803914 | Remaining issues on TRS | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1803915 | Remaining issues on QCL | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.2.3.7 |
available | [WTS] [JSN] | |||
R1-1803916 | Remaining issues on NR power control in non-CA aspects | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1803917 | Remaining issues on NR power control in CA aspects | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1803918 | Updated Coexistence Evaluation Assumptions | discussion | CableLabs | Rel-15 |
R1-92 AI: 7.6.1 |
noted | [WTS] [JSN] | ||
R1-1803919 | CQI and MCS Tables for URLLC | discussion | Ericsson |
R1-92 AI: 7.2.1 |
noted | [WTS] [JSN] | |||
R1-1803920 | On Compact DCI for URLLC | discussion | Ericsson |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1803921 | On PDCCH Repetition for URLLC | discussion | Ericsson |
R1-92 AI: 7.2.3 |
noted | [WTS] [JSN] | |||
R1-1803922 | On Pre-emption in Uplink |
discussion revised to R1-1806005 |
Ericsson |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1803923 | Channel Coding Techniques for URLLC |
discussion revision of R1-1801567 revised to R1-1806006 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803924 | On PUCCH for Ultra-Reliable Transmission |
discussion revision of R1-1801568 revised to R1-1806007 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803925 | On Performance of PUCCH Format 0 for URLLC Use Cases |
discussion revision of R1-1801569 revised to R1-1806008 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803926 | On Performance of PUCCH Format 2 for URLLC Use Cases |
discussion revision of R1-1801570 revised to R1-1806009 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803927 | On Frequency Hopping for Ultra-reliable Transmission |
discussion revision of R1-1801571 revised to R1-1806010 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803928 | On Transmit Diversity for Ultra-high Reliability Use Cases |
discussion revision of R1-1801572 revised to R1-1806011 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803929 | URLLC Downlink System Level Simulation Results |
discussion revision of R1-1801573 revised to R1-1806012 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803930 | On Supporting Reliable HARQ Feedback for UL Transmission with Configured Grant |
discussion revision of R1-1801574 revised to R1-1806013 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803931 | UCI Transmission for URLLC |
discussion revision of R1-1801575 revised to R1-1806014 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803932 | Evaluation of Reliability in NR |
discussion revised to R1-1806015 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803933 | Evaluation of UP latency in NR |
discussion revised to R1-1806016 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803934 | Precoder Update for SPS UL | discussion | Ericsson |
R1-92 AI: 7.2.5 |
withdrawn | [WTS] [JSN] | |||
R1-1803935 | Priority Rules for UL Transmission with Configured Grant | discussion | Ericsson |
R1-92 AI: 7.2.5 |
withdrawn | [WTS] [JSN] | |||
R1-1803936 | Indication of URLLC Configuration |
discussion revised to R1-1806017 |
Ericsson |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803937 | Remaining Issues of Channel Coding | discussion | Ericsson |
R1-92 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-1803938 | Remaining Issues of Soft Buffer Management | discussion | Ericsson |
R1-92 AI: 7.1.3.3.5 |
available | [WTS] [JSN] | |||
R1-1803939 | Ambiguities about PUCCH beam indication |
other revised to R1-1806120 |
Fujitsu |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1803940 | Discussion on remaining details on PT-RS | other | Fujitsu |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1803941 | Frequency domain field interpretation for fallback DCI in DL | other | Fujitsu |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1803942 | Simulation results on PDSCH repetition and new MCS for DL URLLC | other | Fujitsu |
R1-92 AI: 7.2.1 |
withdrawn | [WTS] [JSN] | |||
R1-1803943 | PDCCH repetition for URLLC transmissions | other | Fujitsu |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1803944 | On UL multiplexing of transmissions with different reliability requirements |
other revised to R1-1808302 |
Fujitsu |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1803945 | UCI piggyback on PUSCH with URLLC data |
other revised to R1-1806121 |
Fujitsu |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1803946 | Considerations on NOMA related procedures |
other revised to R1-1806122 |
Fujitsu |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1803947 | Flexible starting transmission point for NR-U |
other revised to R1-1806123 |
Fujitsu |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1803948 | Considerations for Simulation Methodology for NR-U Operation | discussion | ZTE, Sanechips |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1803949 | Discussion on frame structure and scheduling for NR-U | discussion | ZTE, Sanechips |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1803950 | Design on Signal and channel for NR-U | discussion | ZTE, Sanechips |
R1-92 AI: 7.6.3 |
withdrawn | [WTS] [JSN] | |||
R1-1803951 | Considerations on RS/channel design and measurement for NR-U | discussion | ZTE, Sanechips |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1803952 | Design of Channel access mechanism for NR-U | discussion | ZTE, Sanechips |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1803953 | Considerations on NOMA schemes | discussion | Google, Inc. |
R1-92 AI: 7.4.1 |
noted | [WTS] [JSN] | |||
R1-1803954 | Corrections on shortened processing time and shortened TTI in 36 212 |
CR revised to R1-1805769 |
Huawei | 36.212 15.1.0 CR#280 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
revised | [WTS] [JSN] |
R1-1803955 | Correction on DMRS scrambling ID for semi-open loop transmission |
CR revised to R1-1805280 |
Huawei, HiSilicon | 36.211 14.6.0 CR#429 catF | LTE_eFDMIMO-Core | Rel-14 |
R1-92 AI: 6.1.4 |
revised | [WTS] [JSN] |
R1-1803956 | Correction on DMRS scrambling ID for semi-open loop transmission |
CR revised to R1-1805281 |
Huawei, HiSilicon | 36.211 15.1.0 CR#430 catA | LTE_eFDMIMO-Core | Rel-15 |
R1-92 AI: 6.1.4 |
revised | [WTS] [JSN] |
R1-1803957 | On support of SRS antenna switching for 1T4R and 2T4R antenna configurations | other | Huawei, HiSilicon |
R1-92 AI: 6.2.11 |
noted | [WTS] [JSN] | |||
R1-1803958 | On support of PUSCH antenna selection for 1T4R and 2T4R antenna configurations | other | Huawei, HiSilicon |
R1-92 AI: 6.2.11 |
noted | [WTS] [JSN] | |||
R1-1803959 | Introduction of SRS antenna switching for 4 ports in 36.213 |
draftCR revised to R1-1805282 |
Huawei, HiSilicon | LTE_EBF_FDMIMO | Rel-15 |
R1-92 AI: 6.2.11 |
revised | [WTS] [JSN] | |
R1-1803960 | Introduction of FeLAA into 36.212 |
draftCR revised to R1-1805418 |
Huawei | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] | |
R1-1803961 | Introduction of high capacity stationary wireless link and 1024QAM into 36.212 |
draftCR revised to R1-1805315 |
Huawei | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
revised | [WTS] [JSN] | |
R1-1803962 | Discussion on PDSCH repetition for LTE URLLC | discussion | ZTE, Sanechips | Rel-15 |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | ||
R1-1803963 | On UL SPS repetition for LTE URLLC | discussion | ZTE, Sanechips | Rel-15 |
R1-92 AI: 6.2.8.2 |
available | [WTS] [JSN] | ||
R1-1803964 | Discussion on QCL across CCs | discussion | ITRI |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1803965 | Discussion on DCI format 0-0/0-1 | discussion | ITRI |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1803966 | Discussion on bandwidth part operation | discussion | ITRI |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1803967 | Remaining issues on codebook based UL transmission | discussion | OPPO |
R1-92 AI: 7.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1803968 | Remaining issues on non-codebook based UL transmission | discussion | OPPO |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1803969 | Remaining issues on CSI-RS design | discussion | OPPO |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1803970 | Remaining issues on DMRS design | discussion | OPPO |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1803971 | Remaining issues on SRS design | discussion | OPPO |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1803972 | Remaining issues on uplink power control for non-CA | discussion | OPPO |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1803973 | Frame structure for NR-U | discussion | OPPO |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1803974 | Views on physical layer channel design for NR-U | discussion | OPPO |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1803975 | Views on physical layer procedures for NR-U | discussion | OPPO |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1803976 | Channel access mechanisms on NR-U | discussion | OPPO |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803977 | SS/PBCH block transmission on NR-U | discussion | OPPO |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803978 | Discussion on SS/PBCH block waveform for NR-U | discussion | OPPO |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803979 | Paging transmission on NR-U | discussion | OPPO |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803980 | HARQ procedure on NR-U | discussion | OPPO |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1803981 | Remaining issues on CSI measurement | discussion | OPPO |
R1-92 AI: 7.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1803982 | Evaluation on DMRS performance in high mobility scenario | discussion | OPPO |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1803983 | Carrier and resource selection in eV2X carrier aggregation | discussion | OPPO |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1803984 | Synchronization in eV2X carrier aggregation | discussion | OPPO |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1803985 | Transmit diversity scheme in eV2X | discussion | OPPO |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |||
R1-1803986 | Discussion of resource pool sharing between mode 3 and mode 4 | discussion | OPPO |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1803987 | Latency reduction for eV2X | discussion | OPPO |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1803988 | Remaining issues on Search Space | discussion | OPPO |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1803989 | Remaining issues on GC-PDCCH | discussion | OPPO |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1803990 | Discussion of resource allocation for IAB | discussion | OPPO |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1803991 | Remaing issues on RMSI | discussion | OPPO |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1803992 | Remaining details on NR paging | discussion | OPPO |
R1-92 AI: 7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1803993 | Remaining details on NR RRM | discussion | OPPO |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1803994 | Remaining details on NR RLM | discussion | OPPO |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1803995 | On downlink channel power efficiency for efeMTC | discussion | OPPO |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1803996 | On wake-up signal design | discussion | OPPO |
R1-92 AI: 6.2.7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1803997 | On synchronization raster indication | discussion | OPPO |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1803998 | Power offset between SS/PBCH block and PDCCH | discussion | OPPO |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1803999 | Text Proposal for DL PRB Bundling | discussion | OPPO |
R1-92 AI: 7.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1804000 | Text Proposal for Beam Management | discussion | OPPO |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804001 | Text Proposal for Beam Failure Recovery | discussion | OPPO |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804002 | Discussion on simultaneous receptions/transmissions of multiple signals/channels | discussion | OPPO |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804003 | Text Proposal for CSI-RS for Time/frequency Tracking | discussion | OPPO |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1804004 | Text Proposal for QCL | discussion | OPPO |
R1-92 AI: 7.1.2.3.7 |
available | [WTS] [JSN] | |||
R1-1804005 | Multiplexing of HARQ-ACK and SR | discussion | OPPO |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1804006 | Remaining issues on CSI reporting using PUCCH | discussion | OPPO |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804007 | Remaining details on UCI multiplexing | discussion | OPPO |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1804008 | Remaining details on HARQ-ACK transmission | discussion | OPPO |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1804009 | CQI and MCS design for URLLC | discussion | OPPO |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1804010 | DCI design for URLLC | discussion | OPPO |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1804011 | PDCCH repetition for URLLC | discussion | OPPO |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1804012 | Low-latency transmission for uplink | discussion | OPPO |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804013 | Remaining issues on grant free | discussion | OPPO |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |||
R1-1804014 | Remaining issues on CSI reporting | discussion | OPPO |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804015 | Remaining issues on resource allocation for PUCCH | discussion | OPPO |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1804016 | Remaining issues on multi-slot resource allocation | discussion | OPPO |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1804017 | Other aspects on bandwidth parts | discussion | OPPO |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1804018 | V2X Sidelink CA Scheduling issues in Mode 4 | discussion | ITRI |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1804019 | Synchronization for Sidelink Carrier Aggregation in V2X Phase 2 | discussion | ITRI |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1804020 | Discussion on Resource Pool Sharing between Mode 3 and Mode 4 in V2X commuincation | discussion | ITRI |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804021 | Considerations of Latency Reduction between Packet Arrival and Resource Selection | discussion | ITRI |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1804022 | Considerations on NR-eV2X evaluation scenarios | discussion | OPPO |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1804023 | On some remaining issues in channel modelling | discussion | OPPO |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1804024 | Updated UMi calibration results for user experience data rate in the multi-layer network deployment | discussion | ZTE, Sanechips | Rel-15 |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | ||
R1-1804025 | Updated DL spectral efficiency in the eMBB usage scenario for IMT-2020 self evaluation | discussion | ZTE, Sanechips | Rel-15 |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | ||
R1-1804026 | Link curve performance of LDPC coding in IMT-2020 self evaluation | discussion | ZTE, Sanechips | Rel-15 |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | ||
R1-1804027 | Considerations on the evaluated details and parameters for IMT-2020 self evaluation | discussion | ZTE, Sanechips | Rel-15 |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | ||
R1-1804028 | Updated UL spectral efficiency in the eMBB usage scenario for IMT-2020 self evaluation | discussion | ZTE, Sanechips | Rel-15 |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | ||
R1-1804029 | Consideration on Evaluation methodology of IMT-2020 self-evaluation | discussion | ZTE, Sanechips | Rel-15 |
R1-92 AI: 7.8.1 |
available | [WTS] [JSN] | ||
R1-1804030 | Initial consideration on Evaluation of mobility and reliability of IMT-2020 self-evaluation | discussion | ZTE, Sanechips | Rel-15 |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | ||
R1-1804031 | Remaining details on search space |
discussion revised to R1-1807238 |
ASUSTEK COMPUTER (SHANGHAI) | Rel-15 |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | ||
R1-1804032 | Collision between PRACH transmission and SR transmission |
discussion revision of R1-1802249 |
ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1804033 | Discussion about number of DCI format size | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1804034 | Discussion about semi static codebook | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1804035 | Remaining issues on beam management | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804036 | Remaining issues on beam failure recovery procedure |
discussion revised to R1-1807211 |
ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804037 | Potential solutions and techniques for NR unlicensed |
discussion revision of R1-1802072 |
ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804038 | Low PAPR SFBC for V2X transmit diversity |
discussion revision of R1-1802250 |
Mitsubishi Electric RCE | LTE_eV2X-Core | Rel-15 |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |
R1-1804039 | Virtual PHR derivation in some situations |
discussion revised to R1-1807163 |
ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1804040 | Low PAPR SFBC evaluations for PSSCH | discussion | Mitsubishi Electric RCE | LTE_eV2X-Core | Rel-15 |
R1-92 AI: 6.2.5.3.2 |
available | [WTS] [JSN] | |
R1-1804041 | Remaining issues on RRM | discussion | MediaTek Inc. |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1804042 | Remaining issues on RLM | discussion | MediaTek Inc. |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1804043 | Remaining issues on search space | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1804044 | Remaining issues in GC-PDCCH | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1804045 | Remaining issues on DCI contents and formats | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1804046 | Remaining issues in carrier aggregation | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1804047 | Remaining details on RACH procedure |
discussion revised to R1-1805524 |
MediaTek Inc. |
R1-92 AI: 7.1.1.4.2 |
revised | [WTS] [JSN] | |||
R1-1804048 | Remaining TA related issues |
discussion revised to R1-1805525 |
MediaTek Inc. |
R1-92 AI: 7.1.1.6 |
revised | [WTS] [JSN] | |||
R1-1804049 | Remaining details on bandwidth part operation | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1804050 | Remaining issues on synchronization signals | discussion | MediaTek Inc. |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1804051 | Remaining issues on NR-PBCH | discussion | MediaTek Inc. |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1804052 | Remaining issues on RMSI | discussion | MediaTek Inc. |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1804053 | Remaining issues on OSI | discussion | MediaTek Inc. |
R1-92 AI: 7.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1804054 | Remaining issue on Paging | discussion | MediaTek Inc. |
R1-92 AI: 7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1804055 | Discussion on NR UE Feature List | discussion | MediaTek Inc. |
R1-92 AI: 7.1.7 |
noted | [WTS] [JSN] | |||
R1-1804056 | Non-codebook based transmission for UL | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1804057 | Remaining issues in CSI reporting | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804058 | Remaining issues in beam management | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804059 | Remaining issues in beam failure recovery | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804060 | Views on multi-CC QCL assumptions | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804061 | Remaining issues in SRS | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1804062 | On simulation methodology for NR-U operation | discussion | MediaTek Inc. |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1804063 | On frame structure design for NR-U operation | discussion | MediaTek Inc. |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1804064 | On physical later channel design for NR-U operation | discussion | MediaTek Inc. |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804065 | Discussion on potential physical layer procedures in NR-U | discussion | MediaTek Inc. |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804066 | Remaining issues of long-PUCCH | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804067 | Remaining issues of UCI on PUSCH | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1804068 | Remaining issues of DL/UL scheduling and HARQ management | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1804069 | Remaining issues of UL power control | discussion | MediaTek Inc. |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1804070 | Considerations of UE power saving for NR | discussion | MediaTek Inc. |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1804071 | On PDCCH Repetition for URLLC | discussion | MediaTek Inc. |
R1-92 AI: 7.2.3 |
noted | [WTS] [JSN] | |||
R1-1804072 | Remaining issues on PRB bundling | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1804073 | Remaining issues on multiplexing | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1804074 | Remaining issues on CSI-RS | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1804075 | Remaining issues on DMRS | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1804076 | Remaining issues on PT-RS | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1804077 | Remaining issues on TRS | discussion | MediaTek Inc. |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1804078 | On CQI and MCS Design for URLLC | discussion | MediaTek Inc. |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1804079 | On Compact DCI Design for URLLC | discussion | MediaTek Inc. |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1804080 | On UL Multiplexing for URLLC | discussion | MediaTek Inc. |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804081 | On Grant-Free Transmission Framework for URLLC | discussion | MediaTek Inc. |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804082 | Remaining Issues on DL/UL Resource Allocation | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1804083 | Remaining issues on pre-emption indication | discussion | MediaTek Inc. |
R1-92 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1804084 | Power control details for multiplexing UL eMBB and URLLC | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804085 | PHY notification for beam failure instance | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804086 | Remaining issues for preemption indication | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-92 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1804087 | Discussion on remaining issues for DL CE Level determination in NB-IoT | discussion | CMCC |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | |||
R1-1804088 | Discussion on UL power control for Aerial Vehicles | discussion | CMCC |
R1-92 AI: 6.2.9.1 |
available | [WTS] [JSN] | |||
R1-1804089 | Discussion on power offset for PBCH and PDCCH | discussion | CMCC |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1804090 | Discussion on remaining issues for RMSI | discussion | CMCC |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1804091 | Discussion on remaining issues for PRACH configuration table |
discussion revision of R1-1802032 |
CMCC |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1804092 | Discussion on time period for SSB to RO association | discussion | CMCC |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1804093 | Discussion on remaining issues on semi-persistent CSI | discussion | CMCC |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804094 | Discussion on remaining issues on beam failure recovery |
discussion revised to R1-1806359 |
CMCC |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804095 | Discussion on remaining issues on DMRS | discussion | CMCC |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1804096 | Discussion on remaining issues on PT-RS | discussion | CMCC |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1804097 | Discussion on remaining issues on SRS | discussion | CMCC |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1804098 | Discussion on PDCCH blind decoding dropping rule | discussion | CMCC |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1804099 | Discussion on remaining issues for DCI |
discussion revised to R1-1806364 |
CMCC |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1804100 | Discussion on PUCCH repetition |
discussion revised to R1-1806366 |
CMCC |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804101 | Discussion on remaining issues for time domain resource allocation |
discussion revised to R1-1805266, R1-1806367 |
CMCC |
R1-92 AI: 7.1.3.3.1 |
revised | [WTS] [JSN] | |||
R1-1804102 | Discussion on HARQ timing for DL SPS |
discussion revision of R1-1802044 revised to R1-1806368 |
CMCC |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1804103 | Discussion on PUSCH repetition for grant-free transmission | discussion | CMCC |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |||
R1-1804104 | Discussion on power control signalling |
discussion revised to R1-1806370 |
CMCC |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1804105 | Discussion on BLER requirement for URLLC | discussion | CMCC |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1804106 | Discussion on handling for UL URLLC and eMBB collision issue |
discussion revision of R1-1802046 revised to R1-1806369 |
CMCC |
R1-92 AI: 7.2.4 |
noted | [WTS] [JSN] | |||
R1-1804107 | Considerations on Rel-15 NoMA transmitter design |
discussion revised to R1-1806372 |
CMCC |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1804108 | Discussion on SLS Evaluation Methodology and Assumptions for R15 NoMA | discussion | CMCC |
R1-92 AI: 7.4.4 |
noted | [WTS] [JSN] | |||
R1-1804109 | Discussion on evaluation assumption for NR-U | discussion | CMCC |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1804110 | Discussion on deployment scenario and requirement for IAB |
discussion revised to R1-1806374 |
CMCC |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1804111 | Initial self evaluation results for mobility in eMBB scenario |
discussion revised to R1-1806377 |
CMCC |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1804112 | Initial self evaluation results for connection density in mMTC scenario |
discussion revised to R1-1806378 |
CMCC |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1804113 | Initial self evaluation results for reliability in URLLC scenario |
discussion revised to R1-1806379 |
CMCC |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1804114 | Initial link-level self evaluation results for Mobility in eMBB scenario |
discussion revised to R1-1806380 |
CMCC |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1804115 | PUCCH resource allocation prior to RRC configuration | discussion | NEC | NR_newRAT | Rel-15 |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |
R1-1804116 | Discussion on NoMA Schemes for NR | discussion | NEC | FS_NR_NOMA | Rel-15 |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |
R1-1804117 | Considerations on NOMA related procedures | discussion | NEC | FS_NR_NOMA | Rel-15 |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |
R1-1804118 | Enhancements on Type-II CSI Reporting Scheme | discussion | Fraunhofer IIS, Fraunhofer HHI |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804119 | Draft RRC parameter list for L1 configuration of Rel-15 LTE-MTC |
discussion revision of R1-1801480 revised to R1-1805787 |
Ericsson |
R1-92 AI: 6.2.6 |
revised | [WTS] [JSN] | |||
R1-1804120 | Reduced system acquisition time for MTC | discussion | Ericsson |
R1-92 AI: 6.2.6.1 |
available | [WTS] [JSN] | |||
R1-1804121 | Early data transmission for MTC | discussion | Ericsson |
R1-92 AI: 6.2.6.2 |
noted | [WTS] [JSN] | |||
R1-1804122 | Downlink channel power efficiency for MTC | discussion | Ericsson |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1804123 | Uplink HARQ-ACK feedback for MTC | discussion | Ericsson |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | |||
R1-1804124 | PUSCH sub-PRB allocation for MTC | discussion | Ericsson |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | |||
R1-1804125 | Flexible PDSCH/PUSCH starting PRB for MTC | discussion | Ericsson |
R1-92 AI: 6.2.6.6 |
available | [WTS] [JSN] | |||
R1-1804126 | Remaining details of PDSCH 64QAM support for MTC | discussion | Ericsson |
R1-92 AI: 6.2.6.7 |
available | [WTS] [JSN] | |||
R1-1804127 | Solutions for Rel-14 and Rel-15 UE Pool sharing |
other revision of R1-1801422 revised to R1-1805985 |
Huawei, HiSilicon |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804128 | Discussion on latency reduction for eV2X |
other revision of R1-1801423 |
Huawei, HiSilicon |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1804129 | Remaining details for supporting 64-QAM | other | Huawei, HiSilicon |
R1-92 AI: 6.2.5.2 |
available | [WTS] [JSN] | |||
R1-1804130 | Power sharing for UE with limited TX capability | other | Huawei, HiSilicon |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1804131 | Performance evaluation of transmit diversity for eV2X | other | Huawei, HiSilicon |
R1-92 AI: 6.2.5.3.2 |
available | [WTS] [JSN] | |||
R1-1804132 | Transmit diversity solutions for PSSCH and PSCCH | other | Huawei, HiSilicon |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |||
R1-1804133 | Remaining details for synchronization for carrier aggregation on sidelink | other | Huawei, HiSilicon |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1804134 | Discussion on CP Latency | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.11 |
available | [WTS] [JSN] | ||
R1-1804135 | Modulation Enhancements | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.11 |
noted | [WTS] [JSN] | ||
R1-1804136 | Blind/Harq-less repetitions for scheduled DL-SCH in LTE HRLLC | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | ||
R1-1804137 | Clarification on sREG to sCCE mapping for sTTI | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.1.2.2 |
endorsed | [WTS] [JSN] | ||
R1-1804138 | Wake Up Signal Functionsfor NB-IoT | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.7.1.1.1 |
available | [WTS] [JSN] | ||
R1-1804139 | Wake Up Signal Configuration for NB-IoT | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | ||
R1-1804140 | Wake Up Signal Design for NB-IoT | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.7.1.1.3 |
available | [WTS] [JSN] | ||
R1-1804141 | Physical Layer Scheduling Request | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | ||
R1-1804142 | L1 Scheduling Request by Semi Persistent Scheduling | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | ||
R1-1804143 | Early Data Transmission TBS Determination | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | ||
R1-1804144 | CSI Report in Msg3 in Random Acces Procedure in NB-IoT | discussion | MediaTek Inc. | Rel-14 |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | ||
R1-1804145 | NPUSCH UL gap for 2 HARQ processes | discussion | MediaTek Inc. | Rel-14 |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | ||
R1-1804146 | On downlink channel quality measurement and report in Msg3 | other | Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | ||
R1-1804147 | On NPRS for OTDOA |
other revised to R1-1805284 |
Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.1.6 |
revised | [WTS] [JSN] | ||
R1-1804148 | Introduction of further enhancements of NB-IoT |
draftCR revised to R1-1805771 |
Huawei, HiSilicon | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 6.2.7 |
available | [WTS] [JSN] | |
R1-1804149 | Introduction of FeMTC into 36.212 |
draftCR revised to R1-1805772 |
Huawei, HiSilicon | LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 6.2.6 |
available | [WTS] [JSN] | |
R1-1804150 | Correction on TPC field in DCI format 6-1A |
draftCR revised to R1-1805329 |
Huawei, HiSilicon | LTE_feMTC-Core | Rel-14 |
R1-92 AI: 6.1.5 |
revised | [WTS] [JSN] | |
R1-1804151 | Correction on Msg3 power control for NB-IoT |
draftCR revised to R1-1805364 |
Huawei, HiSilicon | NB_IOTenh-Core | Rel-14 |
R1-92 AI: 6.1.6 |
revised | [WTS] [JSN] | |
R1-1804152 | Wake-up signal functions for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1804153 | Wake-up signal configurations and procedures for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | |||
R1-1804154 | Detailed design of wake-up signal for NB-IoT |
discussion revised to R1-1805343 |
Ericsson |
R1-92 AI: 6.2.7.1.1.3 |
revised | [WTS] [JSN] | |||
R1-1804155 | Data transmission during random access procedure for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | |||
R1-1804156 | Physical layer scheduling request for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | |||
R1-1804157 | Semi-persistent scheduling for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | |||
R1-1804158 | Cell search time reduction for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.2.1 |
available | [WTS] [JSN] | |||
R1-1804159 | System information acquisition time reduction for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.2.2 |
available | [WTS] [JSN] | |||
R1-1804160 | Narrowband measurement accuracy improvements for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.3 |
available | [WTS] [JSN] | |||
R1-1804161 | NB-IoT small cell support | discussion | Ericsson |
R1-92 AI: 6.2.7.4 |
available | [WTS] [JSN] | |||
R1-1804162 | NPRACH false alarm reduction for NB-IoT |
discussion revised to R1-1805285 |
Ericsson |
R1-92 AI: 6.2.7.5.1 |
revised | [WTS] [JSN] | |||
R1-1804163 | NPRACH range enhancements for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.5.2 |
available | [WTS] [JSN] | |||
R1-1804164 | DL aspects of TDD for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.6.1 |
available | [WTS] [JSN] | |||
R1-1804165 | UL aspects of TDD for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | |||
R1-1804166 | DL/UL common aspects of TDD for NB-IoT | discussion | Ericsson |
R1-92 AI: 6.2.7.6.3 |
available | [WTS] [JSN] | |||
R1-1804167 | On NPRS performance | discussion | Ericsson |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | |||
R1-1804168 | Remaining issues on DL measurement reporting in NB-IoT | discussion | Ericsson |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | |||
R1-1804169 | ACMA-OFDM with NR LDPC Code for Uplink NOMA | discussion | HUGHES Network Systems Ltd |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1804170 | Low PAPR ACMA (SC-FDE) for Uplink NOMA | discussion | HUGHES Network Systems Ltd |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1804171 | ACMA-OFDM for Uplink NOMA | discussion | HUGHES Network Systems Ltd |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1804172 | IAB scenarios and evaluations |
discussion revised to R1-1805532 |
ZTE, Sanechips |
R1-92 AI: 7.7.2 |
revised | [WTS] [JSN] | |||
R1-1804173 | UCI multiplexing for URLLC | discussion | ZTE, Sanechips |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804174 | Remaining issues on system acquisition time reduction for MTC | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.6.1 |
available | [WTS] [JSN] | |||
R1-1804175 | Remaining issues on UL HARQ-ACK feedback for MTC | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | |||
R1-1804176 | Remaining issues on PUSCH sub-PRB allocation for MTC | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | |||
R1-1804177 | Discussion on Flexible starting PRB of PUSCH/PDSCH for MTC | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.6.6 |
available | [WTS] [JSN] | |||
R1-1804178 | Details on physical layer SR without HARQ-ACK for NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | |||
R1-1804179 | Considerations on physical layer aspects on SPS in NB-IoT |
discussion revision of R1-1801603 |
ZTE, SaneChips |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | |||
R1-1804180 | Cell search enhancement for NB-IoT |
discussion revision of R1-1801604 |
ZTE, SaneChips |
R1-92 AI: 6.2.7.2.1 |
available | [WTS] [JSN] | |||
R1-1804181 | Remaining issues on system information acquisition improvement for NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.2.2 |
available | [WTS] [JSN] | |||
R1-1804182 | Remaining issues on downlink aspects to support TDD NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.6.1 |
available | [WTS] [JSN] | |||
R1-1804183 | Remaining issues on uplink aspects to support TDD NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | |||
R1-1804184 | Remaining issues on common aspects to support TDD NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.6.3 |
available | [WTS] [JSN] | |||
R1-1804185 | Considerations on extended Power Headroom report for NB-IoT |
discussion revision of R1-1801609 revised to R1-1806202 |
ZTE, SaneChips |
R1-92 AI: 6.2.7.7 |
available | [WTS] [JSN] | |||
R1-1804186 | Wake up signal function for NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1804187 | Remaining issues on wake up signal configuration for NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | |||
R1-1804188 | Details design of wake up signal for NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1804189 | Power consumption reduction for physical channels for MTC | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1804190 | On early data transmission for NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | |||
R1-1804191 | On early data transmission for eMTC | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | |||
R1-1804192 | On small cell support for NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.4 |
available | [WTS] [JSN] | |||
R1-1804193 | NPRACH range enhancement | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.5.2 |
noted | [WTS] [JSN] | |||
R1-1804194 | NPRACH reliability enhancement for NB-IoT | discussion | ZTE, SaneChips |
R1-92 AI: 6.2.7.5.1 |
available | [WTS] [JSN] | |||
R1-1804195 | Clarification on NPUSCH postponement | discussion | ZTE, SaneChips |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | |||
R1-1804196 | Correction on PUSCH hopping parameter for eVoLTE |
draftCR revised to R1-1805331 |
ZTE, CMCC | LTE_VoLTE_ViLTE_enh-Core | Rel-14 |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |
R1-1804197 | Remaining issues on CSI-RS | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1804198 | Remaining issues on DMRS | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1804199 | Remaining issues on PTRS | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1804200 | Remaining issue for uplink HARQ-ACK feedback in efeMTC | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | |||
R1-1804201 | Views on TDD downlink aspect | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 6.2.7.6.1 |
available | [WTS] [JSN] | |||
R1-1804202 | Remaining issues on codebook based UL transmission | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1804203 | Remaining issues on non-codebook based UL transmission | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1804204 | Discussion on Mode 4 support for V2X carrier aggregation | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1804205 | Discussion on Pool sharing for V2X Phase 2 | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804206 | Discussion on Latency Reduction for V2X Phase 2 | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1804207 | Remaining issues for HARQ-ACK feedback timing indication | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1804208 | Remaining issues for CA with different numerologies | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1804209 | HARQ-ACK transmission on unlicensed carriers | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804210 | Discussion of beam management for carrier aggregation | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804211 | Discussion of beam failure recovery for carrier aggregation | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804212 | Multiplexing of different type of UCIs | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804213 | Multiplexing between PUCCH and PUSCH | discussion | Lenovo, Motorola Mobility |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1804214 | On PDCCH candidate priority rules | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | ||
R1-1804215 | On PDSCH rate-matching when UE configured with WB RS | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.3.5 |
available | [WTS] [JSN] | ||
R1-1804216 | Remaining issues on PT-RS | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | ||
R1-1804217 | Discussion on possible open issues for PDCCH in URLLC |
discussion revised to R1-1806408 |
Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | ||
R1-1804218 | Discussion on SS/PBCH block for NR-U operation |
discussion revision of R1-1801839 revised to R1-1806410 |
Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | ||
R1-1804219 | Remaining issues on DCI contents and formats | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | ||
R1-1804220 | Remaining issues on resource allocation for PUCCH | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | ||
R1-1804221 | Remaining issues on time-domain scheduling | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | ||
R1-1804222 | Discussion on UL multiplexing of transmissions with different reliability requirements |
discussion revised to R1-1808797 |
Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R1-1804223 | Remaining issues on CSI reporting | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | ||
R1-1804224 | On URLLC PDCCH simulation | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | ||
R1-1804225 | Remaining issues on RACH | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | ||
R1-1804226 | Remaining issues on BWP |
discussion revised to R1-1806411 |
Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | ||
R1-1804227 | Remaining issues on HARQ-ACK codebook | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | ||
R1-1804228 | correction of PUSCH frequency hopping | discussion | Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | ||
R1-1804229 | Considerations on NOMA procedures |
discussion revised to R1-1806405 |
Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | ||
R1-1804230 | Considerations on the LBT procedures for NR unlicensed band |
discussion revision of R1-1801845 revised to R1-1806412 |
Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | ||
R1-1804231 | Considerations on Autonomous UL transmission for NR unlicensed band |
discussion revised to R1-1806413 |
Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | ||
R1-1804232 | Remaining details on TRS design |
discussion revised to R1-1805261 |
Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.2.3.6 |
revised | [WTS] [JSN] | ||
R1-1804233 | Sharing Mode 3 and Mode 4 resource pools | discussion | NEC |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804234 | On enhancing reliability of PDCCH | discussion | NEC |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1804235 | Discussion on the large scale channel model for NTN | discussion | ZTE, Sanechips,CATR |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R1-1804236 | Discussion on the NR impacts on random access for NTN | discussion | ZTE, Sanechips,CATR |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1804237 | Enhancements on power control for aerial vehicle | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.9.1 |
available | [WTS] [JSN] | |||
R1-1804238 | Reducing system acquisition time for efeMTC | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.6.1 |
available | [WTS] [JSN] | ||
R1-1804239 | Data transmission during random access procedure | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | ||
R1-1804240 | Discussion on search space | discussion | Potevio |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1804241 | Discussion on NR unlicensed band operation | discussion | Potevio |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804242 | Discussion on initial access based on beam sweeping in NR-U | discussion | Potevio |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1804243 | Wake-up signal for efeMTC | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1804244 | Uplink HARQ-ACK feedback in efeMTC | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | ||
R1-1804245 | Design of PUSCH Sub-PRB Allocation | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | ||
R1-1804246 | Support for flexible PDSCH/PUSCH starting PRB | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.6.6 |
available | [WTS] [JSN] | ||
R1-1804247 | Remaining issue on supporting DL 64QAM for efeMTC | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.6.7 |
available | [WTS] [JSN] | ||
R1-1804248 | Functions of wake-up signal | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.1.1 |
available | [WTS] [JSN] | ||
R1-1804249 | Wake-up signal configurations and procedures | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | ||
R1-1804250 | Considerations for design of wake-up signal | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | ||
R1-1804251 | Data transmission during random access procedure | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | ||
R1-1804252 | Design of physical layer scheduling request | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | ||
R1-1804253 | Support for semi-persistent scheduling in NB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | ||
R1-1804254 | Reducing cell search time for feNB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.2.1 |
available | [WTS] [JSN] | ||
R1-1804255 | Reducing system acquisition time for feNB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.2.2 |
available | [WTS] [JSN] | ||
R1-1804256 | Remaining Details for Mode 4 support for V2X carrier aggregation | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1804257 | Remaining details of SL CA synchronization | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1804258 | Discussions on support of 64QAM for LTE V2X sidelink | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.5.2 |
available | [WTS] [JSN] | |||
R1-1804259 | Transmit diversity schemes and evaluations for V2X sidelink | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.5.3 |
available | [WTS] [JSN] | |||
R1-1804260 | On Resource pool sharing between mode-3 and mode-4 |
other revision of R1-1802585 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804261 | Discussion on latency reduction for eV2X |
other revision of R1-1802586 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1804262 | Evaluation scenarios of new V2X use cases |
other revision of R1-1802587 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1804263 | V2X channel modelling and other issues |
other revision of R1-1802899 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1804264 | Measurement accuracy improvement in NB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.3 |
available | [WTS] [JSN] | ||
R1-1804265 | Small cell support in NB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.4 |
available | [WTS] [JSN] | ||
R1-1804266 | NPRACH reliability enhancement in NB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.5.1 |
available | [WTS] [JSN] | ||
R1-1804267 | Handling of PDCCH on rate matching resource | discussion | vivo |
R1-92 AI: 7.1.3.5 |
available | [WTS] [JSN] | |||
R1-1804268 | NPRACH cell range enhancement in NB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.5.2 |
available | [WTS] [JSN] | ||
R1-1804269 | Downlink aspects of TDD support in NB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.6.1 |
available | [WTS] [JSN] | ||
R1-1804270 | Uplink aspects of TDD support in NB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | ||
R1-1804271 | Common Aspects of NB-IoT TDD Operation | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.6.3 |
available | [WTS] [JSN] | ||
R1-1804272 | PHR Enhancement for NB-IoT | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
R1-92 AI: 6.2.7.7 |
available | [WTS] [JSN] | ||
R1-1804273 | Remaining issues on PT-RS | discussion | Panasonic Corporation |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1804274 | Simulation methodology and assumptions for NR-U evaluation | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1804275 | Frame structure for NR-U operation | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1804276 | On physical layer channel design for NR unlicensed | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804277 | Physical layer procedure enhancements for NR unlicensed | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804278 | Summary of remaining issues for codebook based transmission for UL MIMO | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1804279 | Remaining issues on PDCCH structure | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.1.1 |
available | [WTS] [JSN] | |||
R1-1804280 | TP on HARQ-ACK reporting with different numerology | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1804281 | Draft CR on PDSCH/PUSCH DMRS position for ECP in TS38.211 | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804282 | Draft CR on PDSCH/PUSCH DMRS position for ECP in TS38.214 | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804283 | Consideration on power saving for NR CA | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.6 |
available | [WTS] [JSN] | |||
R1-1804284 | SRS carrier switching involving SUL | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804285 | On coexistence between LTE and NR | other | Huawei, HiSilicon |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1804286 | Discussion on PHR for SUL | other | Huawei, HiSilicon |
R1-92 AI: 7.1.6.3 |
available | [WTS] [JSN] | |||
R1-1804287 | TP on UCI multiplexing between UL and SUL | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.2.5 |
available | [WTS] [JSN] | |||
R1-1804288 | TP on power control for concurrent transmission of SRS on both UL and SUL | other | Huawei, HiSilicon |
R1-92 AI: 7.1.6.3 |
available | [WTS] [JSN] | |||
R1-1804289 | CSI feedback enhancements for URLLC | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804290 | UCI piggyback on PUSCH for URLLC | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804291 | PUCCH reliability | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804292 | Support of 60 kHz subcarrier spacing | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1804293 | PUCCH resource allocation for non-slot scheduling | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804294 | Considerations on DMRS to support URLLC | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804295 | Summary of remaining issues on UL data transmission procedure | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |||
R1-1804296 | Reliability enhancement for grant-free transmission | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804297 | Discussion on partially overlapped PUCCH and PUSCH for URLLC | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804298 | V2X sidelink measurement results | other | Huawei, HiSilicon |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1804299 | On UE Antenna model in eV2X Evaluation Methodology | other | Huawei, HiSilicon |
R1-92 AI: 7.9 |
available | [WTS] [JSN] | |||
R1-1804300 | Simulation assumptions and preliminary results for NR unlicensed bands | other | Huawei, HiSilicon |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1804301 | Consideration on self evaluation of IMT-2020 for UE energy efficiency | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1804302 | Consideration on self evaluation of IMT-2020 for link budget | other | Huawei, HiSilicon |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1804303 | Evaluation on the dynamic and flexible resouce allocation in IAB | other | Huawei, HiSilicon |
R1-92 AI: 7.7.3 |
available | [WTS] [JSN] | |||
R1-1804304 | TP for chapter 6 of TR38.811 |
other revised to R1-1805670 |
Huawei, HiSilicon |
R1-92 AI: 7.3.2 |
revised | [WTS] [JSN] | |||
R1-1804305 | Remaining issues of NR UE features | other | Huawei, HiSilicon |
R1-92 AI: 7.1.7 |
available | [WTS] [JSN] | |||
R1-1804306 | Draft CR on TS38.211 | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.7 |
withdrawn | [WTS] [JSN] | |
R1-1804307 | Draft CR on resource allocation | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |
R1-1804308 | Draft CR on TBS | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |
R1-1804309 | Draft CR on HARQ-ACK codebook | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |
R1-1804310 | Draft CR on TS38.213 | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.6 |
withdrawn | [WTS] [JSN] | |
R1-1804311 | Correction on scheduling and HARQ procedure for case 1 HARQ timing of EN-DC in TS36.213 | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |
R1-1804312 | CR on semi-static HARQ-ACK codebook fallback operation in 38.213 | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |
R1-1804313 | Channel access and co-existence for NR-U operation | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1804314 | Interlace structures for NR-U uplink | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1804315 | Discussion on measurement report for NB-IoT | discussion | Samsung |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | |||
R1-1804316 | Discussion on UCI transmission without UL-SCH for PUSCH mode 1 | discussion | Samsung |
R1-92 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |||
R1-1804317 | Discussion on UCI transmission on AUL PUSCH | discussion | Samsung |
R1-92 AI: 6.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804318 | mode-4 support in V2X CA | discussion | Samsung |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1804319 | Synchronization in V2X CA | discussion | Samsung |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1804320 | High order modulation in V2X | discussion | Samsung |
R1-92 AI: 6.2.5.2 |
noted | [WTS] [JSN] | |||
R1-1804321 | Transmit diversity schemes for PSSCH | discussion | Samsung |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |||
R1-1804322 | Resource pool sharing between mode 3 and mode 4 Ues | discussion | Samsung |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804323 | Support of shorter latency in V2X | discussion | Samsung |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1804324 | Discussion on enhanced synchronization signals and resynchronization signals | discussion | Samsung |
R1-92 AI: 6.2.6.1 |
available | [WTS] [JSN] | |||
R1-1804325 | Early data transmission for eMTC | discussion | Samsung |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | |||
R1-1804326 | DL power consumption reduction for eMTC | discussion | Samsung |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1804327 | Group DCI for uplink HARQ-ACK feedback |
discussion revision of R1-1801926 |
Samsung |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | |||
R1-1804328 | Discussion on sub-PRB allocation for eFeMTC | discussion | Samsung |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | |||
R1-1804329 | Discussion on Flexible PDSCH/PUSCH starting PRB |
discussion revised to R1-1806686 |
Samsung |
R1-92 AI: 6.2.6.6 |
available | [WTS] [JSN] | |||
R1-1804330 | Discussion on Wake up signal configuraion | discussion | Samsung |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | |||
R1-1804331 | Wake up signal Design | discussion | Samsung |
R1-92 AI: 6.2.7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1804332 | Early data transmission for NB-IOT | discussion | Samsung |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | |||
R1-1804333 | Discussion on scheduling request for NB IoT |
discussion revised to R1-1806690 |
Samsung |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | |||
R1-1804334 | New SPS mechanism for power saving |
discussion revised to R1-1806691 |
Samsung |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | |||
R1-1804335 | Power control for extended coverage UE |
discussion revision of R1-1801934 |
Samsung |
R1-92 AI: 6.2.7.4 |
available | [WTS] [JSN] | |||
R1-1804336 | Reliability enhancements for NPRACH |
discussion revised to R1-1806692 |
Samsung |
R1-92 AI: 6.2.7.5.1 |
available | [WTS] [JSN] | |||
R1-1804337 | Discussion on DL common channel/signal for TDD NB-IoT | discussion | Samsung |
R1-92 AI: 6.2.7.6.1 |
available | [WTS] [JSN] | |||
R1-1804338 | Discussion on UL channel for TDD NB-IoT | discussion | Samsung |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | |||
R1-1804339 | Discussion on 2 HARQ processes and cross carrier scheduling | discussion | Samsung |
R1-92 AI: 6.2.7.6.3 |
available | [WTS] [JSN] | |||
R1-1804340 | Enhanced PHR for NB-IOT |
discussion revision of R1-1801940 |
Samsung |
R1-92 AI: 6.2.7.7 |
available | [WTS] [JSN] | |||
R1-1804341 | Discussion on PDSCH repetition | discussion | Samsung |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | |||
R1-1804342 | Discussion on Repetition for UL SPS | discussion | Samsung |
R1-92 AI: 6.2.8.2 |
available | [WTS] [JSN] | |||
R1-1804343 | Corrections on Synchronization Signaling | discussion | Samsung |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1804344 | Corrections on NR-PBCH | discussion | Samsung |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1804345 | Corrections on Remaining Minimum System Information | discussion | Samsung |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1804346 | Corrections on Other System Information Delivery | discussion | Samsung |
R1-92 AI: 7.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1804347 | Corrections on Paging Design | discussion | Samsung |
R1-92 AI: 7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1804348 | Corrections on PRACH Formats | discussion | Samsung |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1804349 | Corrections on RACH Procedure | discussion | Samsung |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1804350 | Corrections on Measurements for Mobility Management |
discussion revision of R1-1801952 revised to R1-1806706 |
Samsung |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1804351 | Corrections on Radio Link Monitoring for Mobility Management |
discussion revision of R1-1801953 |
Samsung |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1804352 | Corrections on Timing Advance | discussion | Samsung |
R1-92 AI: 7.1.1.6 |
available | [WTS] [JSN] | |||
R1-1804353 | Issues on codeword mapping | discussion | Samsung |
R1-92 AI: 7.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1804354 | Summary of open issues on codeword mapping | discussion | Samsung |
R1-92 AI: 7.1.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1804355 | Issues on codebook based UL transmisison | discussion | Samsung |
R1-92 AI: 7.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1804356 | Open issues on aperiodic CSI-RS for non-codebook-based transmission |
discussion revised to R1-1805510 |
Samsung |
R1-92 AI: 7.1.2.1.3 |
revised | [WTS] [JSN] | |||
R1-1804357 | Issues on CSI reporting | discussion | Samsung |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804358 | Corrections on Beam reporting and Indication | discussion | Samsung |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804359 | Corrections on beam failure recovery | discussion | Samsung |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804360 | Remaining issues on CQI and MCS | discussion | Samsung |
R1-92 AI: 7.1.2.2.5 |
available | [WTS] [JSN] | |||
R1-1804361 | Aperiodic beam reporting | discussion | Samsung |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804362 | Corrections on UL beam management | discussion | Samsung |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804363 | Simultaneous reception of physical channels and reference signals | discussion | Samsung |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804364 | Remaining issues on RS multiplexing | discussion | Samsung |
R1-92 AI: 7.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1804365 | Remaining issues on CSI-RS | discussion | Samsung |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1804366 | Remaining issues on DMRS | discussion | Samsung |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1804367 | Remaining issues on PTRS | discussion | Samsung |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1804368 | Remaining issues on SRS | discussion | Samsung |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1804369 | Remaining issues on TRS | discussion | Samsung |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1804370 | Corrections on Search Space Design | discussion | Samsung |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1804371 | Corrections on UE-Group Common PDCCH | discussion | Samsung |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1804372 | DCI Contents and Formats | discussion | Samsung |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1804373 | Corrections on PUCCH for up to 2 Symbols | discussion | Samsung |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1804374 | Corrections on PUCCH for more than 2 Symbols | discussion | Samsung |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804375 | Corrections on UCI Multiplexing in PUSCH | discussion | Samsung |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1804376 | Corrections on Resource Allocation for PUCCH |
discussion revised to R1-1806724 |
Samsung |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1804377 | Corrections on DL/UL Resource Allocation | discussion | Samsung |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1804378 | Corrections on HARQ Management and Feedback | discussion | Samsung |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1804379 | Corrections on CBG-Based UL/DL Retransmissions | discussion | Samsung |
R1-92 AI: 7.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1804380 | Corrections on Bandwidth Part Operation | discussion | Samsung |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1804381 | Corrections on CA Operation | discussion | Samsung |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1804382 | Corrections on Rate Matching | discussion | Samsung |
R1-92 AI: 7.1.3.5 |
available | [WTS] [JSN] | |||
R1-1804383 | Corrections on Channel Coding | discussion | Samsung |
R1-92 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-1804384 | Corrections on LTE-NR Coexistence | discussion | Samsung |
R1-92 AI: 7.1.5 |
noted | [WTS] [JSN] | |||
R1-1804385 | Corrections on UL Power Control | discussion | Samsung |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1804386 | Corrections on UL Power Control for EN-DC | discussion | Samsung |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1804387 | Corrections on PHR calculation for CA | discussion | Samsung |
R1-92 AI: 7.1.6.3 |
available | [WTS] [JSN] | |||
R1-1804388 | UE Features | discussion | Samsung |
R1-92 AI: 7.1.7 |
available | [WTS] [JSN] | |||
R1-1804389 | CQI and MCS Tables for URLLC |
discussion revised to R1-1805519 |
Samsung |
R1-92 AI: 7.2.1 |
revised | [WTS] [JSN] | |||
R1-1804390 | On Need for Additional DCI Format | discussion | Samsung |
R1-92 AI: 7.2.2 |
noted | [WTS] [JSN] | |||
R1-1804391 | On Need for PDCCH Repetitions | discussion | Samsung |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1804392 | Multiplexing of UL transmissions with different reliability requirements | discussion | Samsung |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804393 | Remaining issues on NTN Channel Modeling |
discussion revised to R1-1806748 |
Samsung |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R1-1804394 | PT-RS design consideration for NTN |
discussion revised to R1-1806749 |
Samsung |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1804395 | Considerations on random access for NTN |
discussion revised to R1-1806750 |
Samsung |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1804396 | Transmitter side signal processing schemes for NOMA |
discussion revised to R1-1806751 |
Samsung |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1804397 | Considerations on receiver types for NoMA schemes |
discussion revision of R1-1802006 revised to R1-1806752 |
Samsung |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1804398 | Procedures related consideration to NOMA |
discussion revision of R1-1802007 |
Samsung |
R1-92 AI: 7.4.3 |
noted | [WTS] [JSN] | |||
R1-1804399 | Considerations on evaluation for NoMA study | discussion | Samsung |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1804400 | Evaluation scenarios for NR V2X | discussion | Samsung |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1804401 | Channel model for NR V2X | discussion | Samsung |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1804402 | Simulation Methodology for NR-U | discussion | Samsung |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1804403 | Frame structure for NR-U | discussion | Samsung |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1804404 | Potential physical layer channel design for NR-U | discussion | Samsung |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804405 | Potential physical layer procedures for NR-U | discussion | Samsung |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804406 | Necessary Enhancements for NR IAB | discussion | Samsung |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1804407 | Evaluation Methodology for NR IAB |
discussion revised to R1-1805274 |
Samsung |
R1-92 AI: 7.7.2 |
revised | [WTS] [JSN] | |||
R1-1804408 | Evaluation methodology for IMT-2020 Submission | discussion | Samsung |
R1-92 AI: 7.8.1 |
available | [WTS] [JSN] | |||
R1-1804409 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.201 |
CR revised to R1-1805335 |
Nokia, Nokia Shanghai Bell | 36.201 15.0.0 CR#24 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] |
R1-1804410 | Correction on mapping to physical resources for slot-SPUCCH format 1/1a/1b with frequency hopping | discussion | Huawei, HiSilicon, Ericsson, LG Electronics |
R1-92 AI: 6.2.1.2.7 |
endorsed | [WTS] [JSN] | |||
R1-1804411 | Discussion on subslot-SPUCCH repetition | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.7 |
noted | [WTS] [JSN] | |||
R1-1804412 | Corrections on timing from sPDSCH to HARQ-ACK for SSC3,4,8 | other | Huawei, HiSilicon, Ericsson, LG Electronics |
R1-92 AI: 6.2.1.2.7 |
available | [WTS] [JSN] | |||
R1-1804413 | Corrections on HARQ-ACK reporting procedure for FS2 with sTTI | other | Huawei, HiSilicon, Ericsson |
R1-92 AI: 6.2.1.2.7 |
available | [WTS] [JSN] | |||
R1-1804414 | Corrections on TBS determination for more than 1 layer | other | Huawei, HiSilicon, Ericsson, Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.1.2.7 |
available | [WTS] [JSN] | |||
R1-1804415 | Corrections on DAI in 36.212 | other | Huawei, HiSilicon, Ericsson, LG Electronics, Qualcomm |
R1-92 AI: 6.2.1.2.7 |
noted | [WTS] [JSN] | |||
R1-1804416 | Correction on antenna ports quasi co-location for DMRS based SPDCCH | discussion | Huawei, HiSilicon, Nokia |
R1-92 AI: 6.2.1.2.7 |
endorsed | [WTS] [JSN] | |||
R1-1804417 | Correction on DCI format 7-1E in 36.212 | discussion | Huawei, HiSilicon, Ericsson, Nokia |
R1-92 AI: 6.2.1.2.7 |
endorsed | [WTS] [JSN] | |||
R1-1804418 | TP on VRB assignment of DL resource allocation type 2 | discussion | Huawei, HiSilicon, Nokia, Mediatek, Qualcomm |
R1-92 AI: 6.2.1.2.7 |
endorsed | [WTS] [JSN] | |||
R1-1804419 | Correction on sequence generation for UE-specific reference signals associated with slotsubslot based PDSCH | discussion | Huawei, HiSilicon, Nokia |
R1-92 AI: 6.2.1.2.7 |
endorsed | [WTS] [JSN] | |||
R1-1804420 | Correction on UCI on PUSCH in 36212 | discussion | Huawei, HiSilicon, LG Electronics, Qualcomm, Ericsson |
R1-92 AI: 6.2.1.2.7 |
endorsed | [WTS] [JSN] | |||
R1-1804421 | Discussion and text proposal on UL resource allocation | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.7 |
available | [WTS] [JSN] | |||
R1-1804422 | Correction on DL subslot pattern determination | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.7 |
available | [WTS] [JSN] | |||
R1-1804423 | Correction on mapping to physical resources for slot-SPUCCH format 1/1a/1b with frequency hopping | other | Huawei, HiSilicon, Ericsson, LG Electronics |
R1-92 AI: 6.2.1.2.7 |
withdrawn | [WTS] [JSN] | |||
R1-1804424 | Discussion on subslot-SPUCCH repetition | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.7 |
withdrawn | [WTS] [JSN] | |||
R1-1804425 | Corrections on timing from sPDSCH to HARQ-ACK for SSC3,4,8 | other | Huawei, HiSilicon, Ericsson, LG Electronics |
R1-92 AI: 6.2.1.2.7 |
withdrawn | [WTS] [JSN] | |||
R1-1804426 | DCI contents and formats for RMSI/OSI/Paging/RAR | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1804427 | Discussion on partial overlap between PUCCHs | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.2.5 |
available | [WTS] [JSN] | |||
R1-1804428 | Discussion on the feasibility of High Accuracy Time Synchronization for NR | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804429 | Discussion on the motivation of High Accuracy Time Synchronization for URLLC | other | Huawei, HiSilicon |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804430 | Remaining issues on CBG-based (re)transmission | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1804431 | Remaining issues on scheduling and HARQ | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1804432 | Discussion and text proposal for HARQ-ACK on PUCCH format 0 | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.2.5 |
available | [WTS] [JSN] | |||
R1-1804433 | On CGS ordering for NR |
other revised to R1-1805732 |
Huawei, HiSilicon, ZTE, Sanechips |
R1-92 AI: 7.1.3.2.5 |
revised | [WTS] [JSN] | |||
R1-1804434 | Discussion on aperiodic CSI feedback on PUCCH in NR | other | Huawei, HiSilicon |
R1-92 AI: 7.1.3.2.5 |
available | [WTS] [JSN] | |||
R1-1804435 | Correction on DL subslot pattern determination | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.7 |
withdrawn | [WTS] [JSN] | |||
R1-1804436 | Necessity for specifying UL SPS with repetition to support URLLC in Rel-15 | other | Huawei, HiSilicon |
R1-92 AI: 6.2.8.3 |
available | [WTS] [JSN] | |||
R1-1804437 | Preliminary summary of specification impact for supporting UL SPS with repetition | other | Huawei, HiSilicon |
R1-92 AI: 6.2.8.3 |
noted | [WTS] [JSN] | |||
R1-1804438 | Discussion on CSI feedback for CA SCell New State | other | Huawei, HiSilicon |
R1-92 AI: 6.2. |
noted | [WTS] [JSN] | |||
R1-1804439 | Discussion on modulation enhancement for 256QAM |
other revision of R1-1801391 |
Huawei, HiSilicon |
R1-92 AI: 6.2.11 |
available | [WTS] [JSN] | |||
R1-1804440 | Discussion on the configuration of UL 256QAM |
other revised to R1-1805294 |
Huawei, HiSilicon |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |||
R1-1804441 | On the configuration of UL 256QAM |
draftCR revised to R1-1805295 |
Huawei, HiSilicon | LTE_UL_CAP_enh-Core | Rel-14 |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |
R1-1804442 | On the configuration of UL 256QAM |
draftCR revised to R1-1805296 |
Huawei, HiSilicon | LTE_UL_CAP_enh-Core | Rel-15 |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |
R1-1804443 | Further discussion on introducing aperiodic TRS | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1804444 | Remaining issues on CQI and MCS | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.2.5 |
available | [WTS] [JSN] | |||
R1-1804445 | Further enhancements on CSI reporting and codebook design | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804446 | [Draft] Reply LS on Beam- and Cell- Radio-Link-Monitoring | other | Huawei, HiSilicon |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1804447 | Antenna selection for PUSCH | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.1.5 |
available | [WTS] [JSN] | |||
R1-1804448 | Remaining issues for SRS switching among CCs | other | Huawei, HiSilicon |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804449 | Independent Power control for SRS | other | Huawei, HiSilicon |
R1-92 AI: 7.1.6.3 |
available | [WTS] [JSN] | |||
R1-1804450 | Uplink Pre-emption for URLLC Reliability | discussion | III |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804451 | Correction on PUCCH multiplexing in 38.213 | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.5 |
available | [WTS] [JSN] | |
R1-1804452 | Draft CR on UL data transmission procedure | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |
R1-1804453 | 3GPP TS 37.213 Physical layer procedures for shared spectrum channel |
draft TS revised to R1-1805351 |
Ericsson | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] | |
R1-1804454 | Introduction of Enhancing CA Utilization into 36.213 |
draftCR revised to R1-1805357 |
Nokia, Nokia Shanghai Bell | LTE_euCA-Core | Rel-15 |
R1-92 AI: 6.2. |
revised | [WTS] [JSN] | |
R1-1804455 | On NR-LTE coex design |
discussion revised to R1-1805534 |
Ericsson GmbH, Eurolab |
R1-92 AI: 7.1.5 |
noted | [WTS] [JSN] | |||
R1-1804456 | Remaining details on PRACH formats | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1804457 | Remaining details on RACH procedure | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.1.4.2 |
noted | [WTS] [JSN] | |||
R1-1804458 | Remaining open items on short PUCCH | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1804459 | Remaining open items on long PUCCH | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804460 | Remaining open items on UCI multiplexing | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1804461 | Remaining open items on PUCCH resource allocation |
discussion revised to R1-1805509 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.2.4 |
revised | [WTS] [JSN] | |||
R1-1804462 | Considerations on NOMA transmitter | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1804463 | Receiver considerations for UL NOMA | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1804464 | Procedures to be considered for NOMA operation | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1804465 | Considerations on NOMA evaluation | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.4.4 |
noted | [WTS] [JSN] | |||
R1-1804466 | Consideration on NOMA study | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1804467 | TDD and FDD for NTN Applications |
discussion revised to R1-1806003 |
HUGHES Network Systems Ltd |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1804468 | Initial link level simulation results for NOCA | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1804469 | Remaining issues on PTRS | discussion | Mitsubishi Electric RCE | Rel-15 |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | ||
R1-1804470 | Fast Fading Model of GEO S-Band Satellite | discussion | Dish Network |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R1-1804471 | Re-Sync Signal Design Considerations | discussion | Sierra Wireless, S.A. | Rel-15 |
R1-92 AI: 6.2.6.1 |
available | [WTS] [JSN] | ||
R1-1804472 | Sub-PRB Design Considerations | discussion | Sierra Wireless, S.A. | Rel-15 |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | ||
R1-1804473 | Work plan for Integrated Access and Backhaul Study Item |
Work Plan revised to R1-1805275 |
Samsung, Qualcomm, AT&T, KDDI |
R1-92 AI: 7.7 |
revised | [WTS] [JSN] | |||
R1-1804474 | EDT Design Consideration | discussion | Sierra Wireless, S.A. | Rel-15 |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | ||
R1-1804475 | WUS Design Considerations | discussion | Sierra Wireless, S.A. | Rel-15 |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | ||
R1-1804476 | TR 38.874, Version 0.1.1 | other | Samsung, Qualcomm, AT&T, KDDI |
R1-92 AI: 7.7 |
noted | [WTS] [JSN] | |||
R1-1804477 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE to 36.213 |
draftCR revised to R1-1804478 |
Motorola Mobility Germany GmbH | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
revised | [WTS] [JSN] | |
R1-1804478 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE to 36.213 |
CR revision of R1-1804477 revised to R1-1807942 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1053 catB | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
agreed | [WTS] [JSN] |
R1-1804479 | Path loss model for NTN | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R1-1804480 | Fast fading characteristics for NTN | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R1-1804481 | Discussion on partial overlap between HARQ-ACK and SR |
discussion revision of R1-1802510 |
Panasonic Corporation |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1804482 | Discussion on partial overlap between PUCCH and PUSCH |
discussion revision of R1-1802512 |
Panasonic Corporation |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1804483 | Discussion on remaining issues on PUCCH resource allocation |
discussion revision of R1-1802513 |
Panasonic Corporation |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1804484 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s00-s05 |
draftCR revised to R1-1804489, R1-1805389 |
Motorola Mobility Germany GmbH | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] | |
R1-1804485 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s06-s09 |
draftCR revised to R1-1804490, R1-1805337 |
Motorola Mobility Germany GmbH | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] | |
R1-1804486 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s10-s13 |
draftCR revised to R1-1804491 |
Motorola Mobility Germany GmbH | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] | |
R1-1804487 | Coding schemes for NOMA in mMTC |
discussion revised to R1-1807169 |
Google Inc. |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1804488 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s14-xx |
draftCR revised to R1-1804492 |
Motorola Mobility Germany GmbH | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] | |
R1-1804489 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s00-s05 |
CR revision of R1-1804484 revised to R1-1805798 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1054 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] |
R1-1804490 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s06-s09 |
CR revision of R1-1804485 revised to R1-1805799 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1055 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] |
R1-1804491 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s10-s13 |
CR revision of R1-1804486 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1056 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
withdrawn | [WTS] [JSN] |
R1-1804492 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s14-xx |
CR revision of R1-1804488 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1057 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
agreed | [WTS] [JSN] |
R1-1804493 | Remaining issues for UCI repetition | discussion | ETRI |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804494 | Corrections on beam failure recovery | discussion | ETRI |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804495 | Considerations on NR impacts for Non-Terrestrial Networks |
discussion revision of R1-1802147 |
ETRI |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1804496 | Introduction of Downlink 1024QAM into 36.201 |
CR revised to R1-1805316 |
Nokia, Nokia Shanghai Bell | 36.201 15.0.0 CR#25 catB | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
revised | [WTS] [JSN] |
R1-1804497 | Discussion on compact DCI format for NR URLLC | discussion | Panasonic Corporation |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1804498 | On UL SPS enhancements for URLLC | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.8.2 |
available | [WTS] [JSN] | |||
R1-1804499 | Remaining details on CSI Reporting | discussion | MTI |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804500 | Clarification on CRC attachment for DL-SCH and PCH transport channels | draftCR | NEC Corporation | NB_IOT-Core | Rel-13 |
R1-92 AI: 6.1.1 |
revised | [WTS] [JSN] | |
R1-1804501 | Symbol index definition for SSB time location | discussion | NEC Corporation | Rel-15 |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | ||
R1-1804502 | Remaining details on common PRB indexing and RRC parameters | discussion | NEC Corporation | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | ||
R1-1804503 | RRC parameter alignment for EN-DC power control | discussion | NEC Corporation | Rel-15 |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | ||
R1-1804504 | Multiplexing of IAB links | discussion | ZTE, Sanechips |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1804505 | IAB enhancements overview | discussion | ZTE, Sanechips |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1804506 | [draft] Reply LS on SI reception in BWP | discussion | LG Electronics |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1804507 | TDD HARQ-ACK resource determination for SPT (36.213) | discussion | LG Electronics, Ericsson, Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.1.1 |
endorsed | [WTS] [JSN] | |||
R1-1804508 | Corrections related to DL data channel for sTTI operation |
discussion revised to R1-1805399 |
LG Electronics, Ericsson, Nokia, Nokia Shanghai Bell, Intel Corporation |
R1-92 AI: 6.2.1.2.4 |
revised | [WTS] [JSN] | |||
R1-1804509 | Corrections related to UL data channel for sTTI operation | discussion | LG Electronics |
R1-92 AI: 6.2.1.2.5 |
available | [WTS] [JSN] | |||
R1-1804510 | Discussion on carrier aggregation in sidelink mode 4 operation | discussion | LG Electronics |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1804511 | Discussion on synchronization for sidelink CA operation | discussion | LG Electronics |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1804512 | Discussion on 64QAM support | discussion | LG Electronics |
R1-92 AI: 6.2.5.2 |
available | [WTS] [JSN] | |||
R1-1804513 | Discussion on transparent transmit diversity | discussion | LG Electronics |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |||
R1-1804514 | Discussion on resource pool sharing between UEs using mode 3 and 4 | discussion | LG Electronics |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804515 | Discussion on maximum time reduction between packet arrival and selected transmission resource | discussion | LG Electronics |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1804516 | Data transmission during random access procedure in MTC | discussion | LG Electronics |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | |||
R1-1804517 | Discussion on wake up signal in MTC | discussion | LG Electronics |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1804518 | Discussion on early termination of uplink repetitions for MTC | discussion | LG Electronics |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | |||
R1-1804519 | Discussion on wake up signal function in NB-IoT | discussion | LG Electronics |
R1-92 AI: 6.2.7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1804520 | Discussion on wake up signal configurations and procedures in NB-IoT | discussion | LG Electronics |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | |||
R1-1804521 | Wake up signal design in NB-IoT | discussion | LG Electronics |
R1-92 AI: 6.2.7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1804522 | Data transmission during random access procedure in NB-IoT | discussion | LG Electronics |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | |||
R1-1804523 | Discussion on Scheduling request in NB-IoT |
discussion revision of R1-1802169 |
LG Electronics |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | |||
R1-1804524 | SPS support in NB-IoT |
discussion revision of R1-1802170 |
LG Electronics |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | |||
R1-1804525 | UL power control enhancement for NB-IoT small cell |
discussion revision of R1-1802174 |
LG Electronics |
R1-92 AI: 6.2.7.4 |
available | [WTS] [JSN] | |||
R1-1804526 | Remaining issues on reliability enhancements for NPRACH | discussion | LG Electronics |
R1-92 AI: 6.2.7.5.1 |
available | [WTS] [JSN] | |||
R1-1804527 | Resource configuration for NPRACH range enhancement | discussion | LG Electronics |
R1-92 AI: 6.2.7.5.2 |
available | [WTS] [JSN] | |||
R1-1804528 | Discussion on DL aspects in TDD NB-IoT | discussion | LG Electronics |
R1-92 AI: 6.2.7.6.1 |
available | [WTS] [JSN] | |||
R1-1804529 | Discussion on UL aspects in TDD NB-IoT | discussion | LG Electronics |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | |||
R1-1804530 | Discussion on common aspects in TDD NB-IoT | discussion | LG Electronics |
R1-92 AI: 6.2.7.6.3 |
available | [WTS] [JSN] | |||
R1-1804531 | Discussion on blind/HARQ-less repetition for scheduled DL-SCH operation | discussion | LG Electronics |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | |||
R1-1804532 | Discussion on repetition enhancements for UL SPS operation | discussion | LG Electronics |
R1-92 AI: 6.2.8.2 |
available | [WTS] [JSN] | |||
R1-1804533 | Remaining Details on Synchronization signal | discussion | LG Electronics |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1804534 | Remaining Details on PBCH design and contents | discussion | LG Electronics |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1804535 | RMSI delivery and CORESET configuration | discussion | LG Electronics |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1804536 | Other system information delivery | discussion | LG Electronics |
R1-92 AI: 7.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1804537 | Paging design in NR | discussion | LG Electronics |
R1-92 AI: 7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1804538 | Discussion on PRACH preamble format details | discussion | LG Electronics |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1804539 | RACH Procedure | discussion | LG Electronics |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1804540 | Remaining Details on L3 measurement and mobility management | discussion | LG Electronics |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1804541 | Discussion on Radio Link Monitoring in NR | discussion | LG Electronics |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1804542 | Corrections on non-codebook-based UL | discussion | LG Electronics |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1804543 | Remaining issues on CSI reporting | discussion | LG Electronics |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804544 | Remaining issues on beam management | discussion | LG Electronics |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804545 | Remaining issues on beam failure recovery | discussion | LG Electronics |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804546 | Correction on multiplexing between CSI-RS and CORESET | discussion | LG Electronics |
R1-92 AI: 7.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1804547 | Text proposals on PT-RS | discussion | LG Electronics |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1804548 | Remaining issues on SRS | discussion | LG Electronics |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1804549 | Text proposals on TRS | discussion | LG Electronics |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1804550 | Remaining issues on PDCCH structure | discussion | LG Electronics |
R1-92 AI: 7.1.3.1.1 |
available | [WTS] [JSN] | |||
R1-1804551 | Remaining issues on search space | discussion | LG Electronics |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1804552 | Remaining issues on group common PDCCH | discussion | LG Electronics |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1804553 | Remaining issues on DCI contents and formats | discussion | LG Electronics |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1804554 | Remaining issues on short-duration PUCCH | discussion | LG Electronics |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1804555 | Remaining issues on long-duration PUCCH | discussion | LG Electronics |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804556 | Remaining issues on UCI multiplexing | discussion | LG Electronics |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1804557 | Remaining issues on PUCCH resource allocation | discussion | LG Electronics |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1804558 | Remaining issues on Resource allocation | discussion | LG Electronics |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1804559 | Remaining issues on DL/UL scheduling and HARQ | discussion | LG Electronics |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1804560 | Remaining issues on UL data transmission procedure |
discussion revised to R1-1806628 |
LG Electronics |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |||
R1-1804561 | Remaining issues on bandwidth part operation | discussion | LG Electronics |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1804562 | Remaining issues on CA and HARQ-ACK codebook | discussion | LG Electronics |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1804563 | Remaining issues on rate matching | discussion | LG Electronics |
R1-92 AI: 7.1.3.5 |
available | [WTS] [JSN] | |||
R1-1804564 | Remaining issues on NR-LTE DC/Coexistence | discussion | LG Electronics |
R1-92 AI: 7.1.5 |
noted | [WTS] [JSN] | |||
R1-1804565 | Remaining issues on power sharing between LTE and NR | discussion | LG Electronics |
R1-92 AI: 7.1.6.3 |
available | [WTS] [JSN] | |||
R1-1804566 | Remaining issues on non-CA aspect of UL power control | discussion | LG Electronics |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1804567 | Remaining issues on CA aspect of UL power control | discussion | LG Electronics |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1804568 | Views on UE feature (scheduling, BWP) | discussion | LG Electronics |
R1-92 AI: 7.1.7 |
available | [WTS] [JSN] | |||
R1-1804569 | Discussion on CQI and MCS table design for URLLC | discussion | LG Electronics |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1804570 | Discussion on compact DCI format design | discussion | LG Electronics |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1804571 | Discussion on PDCCH repetition for URLLC | discussion | LG Electronics |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1804572 | Discussion on multiplexing UL transmission with different requirements | discussion | LG Electronics |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804573 | Transmitter side signal processing schemes for NCMA | discussion | LG Electronics |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1804574 | Considerations on the receiver types and NoMA schemes | discussion | LG Electronics |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1804575 | Discussion on procedures related to NOMA | discussion | LG Electronics |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1804576 | Initial LLS evaluation for NCMA | discussion | LG Electronics |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1804577 | Discussion on evaluation scenarios for new V2X use cases | discussion | LG Electronics |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1804578 | Discussion on channel model for new V2X use cases | discussion | LG Electronics |
R1-92 AI: 7.5.2 |
noted | [WTS] [JSN] | |||
R1-1804579 | Simulation methodology for NR unlicensed operation |
discussion revised to R1-1805580 |
LG Electronics |
R1-92 AI: 7.6.1 |
revised | [WTS] [JSN] | |||
R1-1804580 | Frame structure for NR unlicensed operation | discussion | LG Electronics |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1804581 | Physical layer channel design for NR unlicensed operation | discussion | LG Electronics |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804582 | Physical layer procedures for NR unlicensed operation | discussion | LG Electronics |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804583 | Discussions on NR IAB support | discussion | LG Electronics |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1804584 | Discussions on evaluation methodology on NR IAB | discussion | LG Electronics |
R1-92 AI: 7.7.2 |
noted | [WTS] [JSN] | |||
R1-1804585 | Initial evaluation results of eMBB for ITU IMT-2020 self-evaluation | discussion | LG Electronics |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1804586 | Calibration results for ITU IMT-2020 self-evaluation | discussion | LG Electronics |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1804587 | On blind/HARQ-less PDSCH repetition | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | |||
R1-1804588 | On higher layer configured PCFICH for URLLC | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.8.3 |
noted | [WTS] [JSN] | |||
R1-1804589 | Draft TR 37.885 v0.1.0 Study on evaluation methodology of new Vehicle-to-Everything V2X use cases for LTE and NR | draft TR | LG Electronics Inc. | FS_LTE_NR_V2X_eval | Rel-15 |
R1-92 AI: 7.5 |
endorsed | [WTS] [JSN] | |
R1-1804590 | Remaining details on RACH timing for NR | discussion | ITL |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1804591 | Broadcast signals and synchronization for NR-U | discussion | ITL |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804592 | Frame structure and numerology for NR-U | discussion | ITL |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1804593 | Remaining issues on downlink beam management |
discussion revised to R1-1806563 |
Sony |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804594 | Remaining issues on SRS | discussion | Sony |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1804595 | Compact DCI for NR URLLC operation |
discussion revision of R1-1802260 |
Sony |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1804596 | Discussion on remaining issues of eV2X evaluation methodology | discussion | Sony |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1804597 | Considerations on physical layer procedures for NR unlicensed operations | discussion | Sony |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804598 | Considerations on frame structure for NR unlicensed operations |
discussion revised to R1-1806567 |
Sony |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1804599 | PDCCH repetition for NR URLLC | discussion | Sony |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1804600 | Considerations on UL pre-emption |
discussion revision of R1-1802063 |
Sony |
R1-92 AI: 7.2.4 |
noted | [WTS] [JSN] | |||
R1-1804601 | Consideration on the transmitter side signal processing for NOMA |
discussion revision of R1-1802065 revised to R1-1806565 |
Sony |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1804602 | Considerations on eSS for efeMTC | discussion | Sony |
R1-92 AI: 6.2.6.1 |
available | [WTS] [JSN] | |||
R1-1804603 | On Early Data Transmission over Message 3 | discussion | Sony |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | |||
R1-1804604 | Considerations of using WUS in efeMTC | discussion | Sony |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1804605 | Remaining issues in explicit uplink HARQ-ACK feedback for efeMTC | discussion | Sony |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | |||
R1-1804606 | Remaining issues in sub-PRB transmission | discussion | Sony |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | |||
R1-1804607 | Flexible PDSCH/PUSCH Resource Allocation for efeMTC |
discussion revision of R1-1802060 |
Sony |
R1-92 AI: 6.2.6.6 |
available | [WTS] [JSN] | |||
R1-1804608 | Use of option B CQI table by non-64QAM capable UEs | discussion | Sony |
R1-92 AI: 6.2.6.7 |
available | [WTS] [JSN] | |||
R1-1804609 | Discussion on UL transmission for aerial vehicle |
discussion revision of R1-1720472 |
Sony |
R1-92 AI: 6.2.9.1 |
available | [WTS] [JSN] | |||
R1-1804610 | Considerations on NTN Relay use cases | discussion | Sony |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1804611 | NR enhancements to support integrated access and backhaul | discussion | Sony |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1804612 | DL Control Techniques for LTE URLLC |
discussion revision of R1-1802887 |
Fraunhofer HHI |
R1-92 AI: 6.2.8.3 |
available | [WTS] [JSN] | |||
R1-1804613 | Remaining issues for the Slot Format Indication | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1804614 | On the alignment of DCI format sizes | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1804615 | Remaining details of CQI and MCS for URLLC | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1804616 | On further study of compact DCI for URLLC |
discussion revised to R1-1805268 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.2.2 |
revised | [WTS] [JSN] | |||
R1-1804617 | Discussion on reliability enhancement for PDCCH | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1804618 | On UL multiplexing between eMBB and URLLC | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804619 | Simultaneous configuration of grant and grant-free based UL transmission for URLLC UEs | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804620 | Enhancements to support NR backhaul links | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.7.1 |
noted | [WTS] [JSN] | |||
R1-1804621 | IAB Deployment Scenarios and Evaluation Methodology | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.7.2 |
available | [WTS] [JSN] | |||
R1-1804622 | Dynamic resource allocation between backhaul and access link | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.7.3 |
available | [WTS] [JSN] | |||
R1-1804623 | RRM measurements in presence of IAB | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.7.3 |
available | [WTS] [JSN] | |||
R1-1804624 | IAB timing | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.7.3 |
available | [WTS] [JSN] | |||
R1-1804625 | IAB Topology Discussion | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.7.3 |
available | [WTS] [JSN] | |||
R1-1804626 | On Cross-link Interference Management in IA | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.7.3 |
available | [WTS] [JSN] | |||
R1-1804627 | Introducing sTTI to V2X mode 3 |
discussion revision of R1-1720477 revised to R1-1806950 |
Panasonic |
R1-92 AI: 6.2.5.6 |
available | [WTS] [JSN] | |||
R1-1804628 | Discussion on resource pool sharing between UEs in mode 3 and UEs in mode 4 |
discussion revision of R1-1802442 revised to R1-1806951 |
Panasonic |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804629 | On Mode-4 resource selection for PC5 CA |
other revised to R1-1806147 |
Ericsson |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1804630 | On Synchronization Aspects for PC5 CA | other | Ericsson |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1804631 | Spectrum considerations for PC5 carrier aggregation |
other revision of R1-1802517 |
Ericsson |
R1-92 AI: 6.2.5.1.3 |
available | [WTS] [JSN] | |||
R1-1804632 | Supporting 64QAM on PC5 |
other revised to R1-1806148 |
Ericsson |
R1-92 AI: 6.2.5.2 |
available | [WTS] [JSN] | |||
R1-1804633 | Transmit diversity solutions for Rel-15 PSCCH and PSSCH transmissions | other | Ericsson |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |||
R1-1804634 | Evaluation of transmit diversity for V2X | other | Ericsson |
R1-92 AI: 6.2.5.3.2 |
available | [WTS] [JSN] | |||
R1-1804635 | DMRS design for two-port PSSCH transmission |
other revision of R1-1802521 |
Ericsson |
R1-92 AI: 6.2.5.3.3 |
available | [WTS] [JSN] | |||
R1-1804636 | Resource pool sharing between mode 3 and mode 4 UEs |
other revised to R1-1806149 |
Ericsson |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804637 | Reducing time-to-transmit for V2X |
other revision of R1-1802523 |
Ericsson |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1804638 | Simulation scenarios and performance metrics for V2X |
other revision of R1-1802524 |
Ericsson |
R1-92 AI: 7.5.1 |
noted | [WTS] [JSN] | |||
R1-1804639 | On channel models for eV2X evaluation |
other revision of R1-1802525 |
Ericsson |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1804640 | Phase noise correction for non-terrestrial networks |
discussion revised to R1-1805984 |
Mitsubishi Electric RCE | Rel-15 |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | ||
R1-1804641 | On details of CQI and MCS tables for NR URLLC | discussion | Panasonic |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1804642 | Discussion on URLLC UL multiplexing | discussion | Panasonic |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804643 | On support of faster inter-bandwidth part hopping for increased reliability | discussion | Panasonic |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804644 | On PDCCH repetition for NR URLLC |
discussion revision of R1-1802534 |
Sequans Communications |
R1-92 AI: 7.2.3 |
noted | [WTS] [JSN] | |||
R1-1804645 | Discussion on procedures related to NOMA | discussion | Google, Inc. |
R1-92 AI: 7.4.3 |
withdrawn | [WTS] [JSN] | |||
R1-1804646 | Discussion on procedures related to NOMA |
discussion revised to R1-1807209 |
Google, Inc. |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1804647 | DMRS for pi/2 BPSK with spectrum shaping | report | IITH, CEWIT, IITM, Tejas Networks, Reliance Jio |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1804648 | Remaining detail on the indication of cell-defining SS/PBCH block | discussion | Xiaomi Communications |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1804649 | Considerations on SS/PBCH blocks for NR unlicensed | discussion | Xiaomi Technology |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804650 | Further details of PDSCH time-domain resource allocation before RRC connection setup | discussion | AT&T |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1804651 | Further details on NR UE Feature List | discussion | AT&T |
R1-92 AI: 7.1.7 |
noted | [WTS] [JSN] | |||
R1-1804652 | Remaining details of RACH Procedures | discussion | AT&T |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1804653 | Impact of beam failure and recovery on RLM procedures | discussion | AT&T |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1804654 | Remaining issue for MIMO Codeword mapping | discussion | AT&T |
R1-92 AI: 7.1.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1804655 | Remaining issue for CSI Reporting | discussion | AT&T |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804656 | DCI size reduction for eMBB | discussion | AT&T |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1804657 | Remianing issues of multi-slot PUCCH | discussion | AT&T |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1804658 | CQI/MCS table design for URLLC | discussion | AT&T |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1804659 | Compact DCI and DM-RS design for URLLC | discussion | AT&T |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1804660 | On PDCCH repetition for URLLC | discussion | AT&T |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1804661 | Simulation assumptions, scenarios and channel model for IAB | discussion | AT&T |
R1-92 AI: 7.7.2 |
available | [WTS] [JSN] | |||
R1-1804662 | Overview of Physical layer enhancements for IAB | discussion | AT&T |
R1-92 AI: 7.7.1 |
noted | [WTS] [JSN] | |||
R1-1804663 | System level simulation results of IAB | discussion | AT&T |
R1-92 AI: 7.7.3 |
available | [WTS] [JSN] | |||
R1-1804664 | Simulation assumptions and scenarios for NR Unlicensed | discussion | AT&T |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1804665 | Closed loop LBT for Licensed Assisted NR | discussion | AT&T |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804666 | Physical layer enhancements for NR Unlicensed | discussion | AT&T |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804667 | On Transnmitter side processing for NOMA | discussion | AT&T |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1804668 | Low complexity Receiver design for NOMA | discussion | AT&T |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1804669 | Link level evaluaiton of NOMA schemes | discussion | AT&T |
R1-92 AI: 7.4.3 |
withdrawn | [WTS] [JSN] | |||
R1-1804670 | Views On NOMA procedures | discussion | AT&T |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1804671 | Evaluation scenario and simulation assumptions | discussion | AT&T |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1804672 | Channel model for V2X | discussion | AT&T |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1804673 | Integrated access and sidelink: A unified concept for V2X | discussion | AT&T |
R1-92 AI: 7.5.3 |
noted | [WTS] [JSN] | |||
R1-1804674 | Remaining issues on dynamic BWP switching |
discussion revised to R1-1806964 |
InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |
R1-1804675 | Timing and Asynchronous Transmissions with Power Control for NR DC |
discussion revised to R1-1806966 |
InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-92 AI: 7.1.6.3 |
available | [WTS] [JSN] | |
R1-1804676 | Power Control for NR DC |
discussion revised to R1-1806967 |
InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-92 AI: 7.1.6.3 |
available | [WTS] [JSN] | |
R1-1804677 | Transmission of UCI with different reliability requirements | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |
R1-1804678 | Power Control for Transmissions with Different Service Requirements | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |
R1-1804679 | Open Issues on Mode 3 and Mode 4 Pool Sharing |
discussion revised to R1-1806962 |
InterDigital, Inc. | LTE_eV2X | Rel-15 |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |
R1-1804680 | BWP operation in unlicensed spectrum |
discussion revised to R1-1806968 |
InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |
R1-1804681 | Discussion on L1 data rate | discussion | Intel Corporation |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1804682 | DRAFT Reply LS on formula or table for L1 data rate | discussion | Intel Corporation |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1804683 | RE mapping of sPDCCH | discussion | Intel Corporation, Ericsson, Nokia, Qualcomm |
R1-92 AI: 6.2.1.2.2 |
endorsed | [WTS] [JSN] | |||
R1-1804684 | On TBS selection for LTE | discussion | Intel Corporation |
R1-92 AI: 6.2.11 |
available | [WTS] [JSN] | |||
R1-1804685 | Corrections to 1024QAM support in LTE | discussion | Intel Corporation |
R1-92 AI: 6.2.3.1 |
noted | [WTS] [JSN] | |||
R1-1804686 | Remaining physical layer aspects of sidelink carrier aggregation for mode-4 LTE V2V communication | discussion | Intel Corporation |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1804687 | Remaining synchronization details for LTE V2V sidelink carrier aggregation | discussion | Intel Corporation |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1804688 | On demodulation enhancements for LTE V2V sidelink communication | discussion | Intel Corporation |
R1-92 AI: 6.2.5.2 |
available | [WTS] [JSN] | |||
R1-1804689 | On support of transmit diversity schemes for LTE V2V sidelink communication | discussion | Intel Corporation |
R1-92 AI: 6.2.5.3 |
available | [WTS] [JSN] | |||
R1-1804690 | Sidelink resource pool sharing for eNB-controlled and UE-autonomous V2V transmission modes | discussion | Intel Corporation |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804691 | Resource selection latency reduction for LTE V2V sidelink communication | discussion | Intel Corporation |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1804692 | System acquisition time reduction for efeMTC | discussion | Intel Corporation |
R1-92 AI: 6.2.6.1 |
available | [WTS] [JSN] | |||
R1-1804693 | Early data transmission for efeMTC | discussion | Intel Corporation |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | |||
R1-1804694 | Power saving signal for efeMTC | discussion | Intel Corporation |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1804695 | HARQ-ACK feedback for efeMTC UL transmission | discussion | Intel Corporation |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | |||
R1-1804696 | Design of sub-PRB PUSCH for efeMTC | discussion | Intel Corporation |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | |||
R1-1804697 | The function scope of wake-up signal for feNB-IoT | discussion | Intel Corporation |
R1-92 AI: 6.2.7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1804698 | Configurations of wake-up signal for feNB-IoT | discussion | Intel Corporation |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | |||
R1-1804699 | Early data transmission for feNB-IoT | discussion | Intel Corporation |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | |||
R1-1804700 | Scheduling request for feNB-IoT | discussion | Intel Corporation |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | |||
R1-1804701 | Repetitions for DL operation | discussion | Intel Corporation |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | |||
R1-1804702 | On UL power control enhancements for Aerial Vehicles | discussion | Intel Corporation |
R1-92 AI: 6.2.9.1 |
available | [WTS] [JSN] | |||
R1-1804703 | Remaining details of SS/PBCH block | discussion | Intel Corporation |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1804704 | Remaining details of NR-PBCH | discussion | Intel Corporation |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1804705 | Remaining details of RMSI | discussion | Intel Corporation |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1804706 | NR PRACH formats | discussion | Intel Corporation |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1804707 | NR RACH procedures | discussion | Intel Corporation |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1804708 | Remaining details of RRM measurements | discussion | Intel Corporation |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1804709 | Remaining details of RLM | discussion | Intel Corporation |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1804710 | On Codebook based transmission for UL | discussion | Intel Corporation |
R1-92 AI: 7.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1804711 | On non-codebook based transmission for UL | discussion | Intel Corporation |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1804712 | Remaining issues on interference measurement for CSI | discussion | Intel Corporation |
R1-92 AI: 7.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1804713 | Remaining issues on CSI reporting | discussion | Intel Corporation |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804714 | Remaining Issues on beam management | discussion | Intel Corporation |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804715 | Remaining Issues on beam failure recovery | discussion | Intel Corporation |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804716 | Corrections to CQI definition in NR | discussion | Intel Corporation |
R1-92 AI: 7.1.2.2.5 |
available | [WTS] [JSN] | |||
R1-1804717 | Spatial QCL considerations for multiplexing of physical channels and RS | discussion | Intel Corporation |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804718 | On UE capability signalling for Type II CSI | discussion | Intel Corporation |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804719 | Remaining issues on CSI-RS | discussion | Intel Corporation |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1804720 | Remaining issues on DM-RS | discussion | Intel Corporation |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1804721 | Remaining issues On PT-RS | discussion | Intel Corporation |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1804722 | Remaining issues on SRS | discussion | Intel Corporation |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1804723 | Remaining Issues On TRS | discussion | Intel Corporation |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1804724 | Corrections to QCL for NR | discussion | Intel Corporation |
R1-92 AI: 7.1.2.3.7 |
available | [WTS] [JSN] | |||
R1-1804725 | NR PDCCH search spaces: BDs and channel estimation requirements | discussion | Intel Corporation |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1804726 | GC PDCCH: Some remaining details | discussion | Intel Corporation |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1804727 | Further considerations on DCI sizes | discussion | Intel Corporation |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1804728 | Handling collision between HARQ-ACK/SR and CSI | discussion | Intel Corporation |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1804729 | PUSCH-PUCCH and PUCCH-PUCCH collision handling | discussion | Intel Corporation |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804730 | UCI on PUSCH | discussion | Intel Corporation |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1804731 | Resource allocation before RRC setup | discussion | Intel Corporation |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1804732 | On peak rates and remaining details on DL/UL RA | discussion | Intel Corporation |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1804733 | Some remaining details on DL/UL scheduling and HARQ management | discussion | Intel Corporation |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1804734 | Remaining issues of UL data transmission procedures | discussion | Intel Corporation |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |||
R1-1804735 | Further discussion UCI mapping for carrier aggregation | discussion | Intel Corporation |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1804736 | On Power Control framework | discussion | Intel Corporation |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1804737 | Power headroom report for NR carrier aggregation | discussion | Intel Corporation |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1804738 | On NR UE feature list |
discussion revised to R1-1805546 |
Intel Corporation |
R1-92 AI: 7.1.7 |
revised | [WTS] [JSN] | |||
R1-1804739 | CQI and MCS tables for NR URLLC | discussion | Intel Corporation |
R1-92 AI: 7.2.1 |
noted | [WTS] [JSN] | |||
R1-1804740 | On compact DCI format for NR URLLC | discussion | Intel Corporation |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1804741 | On NR PDCCH repetitions for URLLC | discussion | Intel Corporation |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1804742 | Handling UL transmissions with different reliability requirements | discussion | Intel Corporation |
R1-92 AI: 7.2.4 |
noted | [WTS] [JSN] | |||
R1-1804743 | NOMA transmission scheme: LCRS | discussion | Intel Corporation |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1804744 | Receiver structure for NOMA | discussion | Intel Corporation |
R1-92 AI: 7.4.2 |
noted | [WTS] [JSN] | |||
R1-1804745 | NOMA related procedure | discussion | Intel Corporation |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1804746 | Initial LLS results and SLS evaluation assumptions |
discussion revised to R1-1805528 |
Intel Corporation |
R1-92 AI: 7.4.4 |
revised | [WTS] [JSN] | |||
R1-1804747 | On scenarios, traffic models and performance metrics for eV2X evaluations | discussion | Intel Corporation |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1804748 | On channel models for eV2X evaluation methodology | discussion | Intel Corporation |
R1-92 AI: 7.5.2 |
noted | [WTS] [JSN] | |||
R1-1804749 | On the simulation methodology for NR unlicensed | discussion | Intel Corporation |
R1-92 AI: 7.6.1 |
noted | [WTS] [JSN] | |||
R1-1804750 | On the flexibility of NR to operate in unlicensed spectrum | discussion | Intel Corporation |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1804751 | Design consideration for NR unlicensed physical layer channels | discussion | Intel Corporation |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804752 | Enhancements to NR to operate in unlicensed spectrum | discussion | Intel Corporation |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804753 | Consideration for NR unlicensed channel access mechanism | discussion | Intel Corporation |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804754 | Initial thoughts foron technology neutral design for greenfield | discussion | Intel Corporation |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1804755 | RAN1 related issues in IAB | discussion | Intel Corporation |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1804756 | Evaluation methodology for IAB | discussion | Intel Corporation |
R1-92 AI: 7.7.2 |
available | [WTS] [JSN] | |||
R1-1804757 | On Simulation Assumptions, Features and Parameters for IMT-2020 self-evaluation | discussion | Intel Corporation |
R1-92 AI: 7.8.1 |
available | [WTS] [JSN] | |||
R1-1804758 | On the IMT-2020 Self-Evaluation Performance Metrics and Initial Results | discussion | Intel Corporation |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1804759 | Remaining details on PDCCH structure | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.1.1 |
available | [WTS] [JSN] | |||
R1-1804760 | On NR operation under PDCCH channel estimation and BD limits | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1804761 | Remaining details on search space |
other revised to R1-1805517 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.1.2 |
revised | [WTS] [JSN] | |||
R1-1804762 | On remaining details of BWPs | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1804763 | Remaining aspects of NR CA | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1804764 | Remaining details on rate-matching in NR | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.5 |
available | [WTS] [JSN] | |||
R1-1804765 | Precoder Update for SPS UL |
discussion revised to R1-1806018 |
Ericsson Inc. |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1804766 | Frame Structure Design for NR-U | discussion | Charter Communications |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1804767 | Design considerations for standalone NR-U | discussion | Charter Communications |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804768 | NR Unlicensed physical channel design considerations | discussion | Apple Inc. |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804769 | NR Unlicensed considerations | discussion | Apple Inc. |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804770 | Discussion on beam measurement and reporting | discussion | Apple Inc. |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804771 | Discussion on CBG based retransmissions | discussion | Apple Inc. |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1804772 | Discussion on handling of UL multiplexing of transmissions with different reliability requirement | discussion | Apple Inc. |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804773 | Potential enhancements for NR UE power saving | discussion | Apple Inc. |
R1-92 AI: 7.1.3.6 |
available | [WTS] [JSN] | |||
R1-1804774 | Remaining details on synchronization signal design | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | ||
R1-1804775 | Remaining details on NR-PBCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | ||
R1-1804776 | Remaining system information delivery consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | ||
R1-1804777 | Paging design consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.3 |
available | [WTS] [JSN] | ||
R1-1804778 | Remaining details on PRACH formats | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | ||
R1-1804779 | Remaining details on RACH procedure |
discussion revised to R1-1805527 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
revised | [WTS] [JSN] | ||
R1-1804780 | Remaining details on measurement for mobility management | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | ||
R1-1804781 | Radio link monitoring consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | ||
R1-1804782 | Remaining details on Timing advance granularity and adjustment consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.6 |
available | [WTS] [JSN] | ||
R1-1804783 | Maintenance for codebook based UL transmission | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.1.2 |
available | [WTS] [JSN] | ||
R1-1804784 | Maintenance for non-codebook based UL transmission | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | ||
R1-1804785 | Maintenance for CSI measurement |
discussion revised to R1-1805521 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.2.1 |
revised | [WTS] [JSN] | ||
R1-1804786 | Maintenance for CSI reporting | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | ||
R1-1804787 | Beam management for NR | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | ||
R1-1804788 | Beam recovery procedures | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | ||
R1-1804789 | Details on simultaneous reception of PHY channels and RS in FR2 | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | ||
R1-1804790 | Maintenance for Multiplexing of RS | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.3.1 |
available | [WTS] [JSN] | ||
R1-1804791 | Maintenance for on CSI-RS | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | ||
R1-1804792 | Maintenance for DMRS | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | ||
R1-1804793 | PTRS considerations | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | ||
R1-1804794 | Maintenance for SRS | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | ||
R1-1804795 | Remaining issues on TRS | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | ||
R1-1804796 | Remaining details on QCL | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.3.7 |
available | [WTS] [JSN] | ||
R1-1804797 | Remaining issues on PDCCH structure | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.1.1 |
available | [WTS] [JSN] | ||
R1-1804798 | Remaining issues on control resource set and search space | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | ||
R1-1804799 | Remaining issues for slot format indication | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | ||
R1-1804800 | Discussion on DCI related issues | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | ||
R1-1804801 | TP for 38.213 on SFI |
discussion revised to R1-1805569 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.1.5 |
revised | [WTS] [JSN] | ||
R1-1804802 | Remaining issues for short PUCCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | ||
R1-1804803 | Remaining issues for long PUCCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | ||
R1-1804804 | Remaining issues for multiplexing UCI on PUSCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | ||
R1-1804805 | Remaining issues for resource allocation for PUCCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | ||
R1-1804806 | Remaining Issues on DL/UL resource allocation | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | ||
R1-1804807 | Remaining Issues on DL/UL Scheduling, Processing Time and HARQ management | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | ||
R1-1804808 | Remaining issues on downlink preemption indication | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1804809 | Remaining issues on BWP | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | ||
R1-1804810 | Remaining issues on CA | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | ||
R1-1804811 | Remaining aspects of NR-LTE coexistence | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.5 |
noted | [WTS] [JSN] | ||
R1-1804812 | Remaining issues on power control for NR | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | ||
R1-1804813 | Remaining Issues on power control for NR CA | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | ||
R1-1804814 | NR Features and Capabilities | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.7 |
available | [WTS] [JSN] | ||
R1-1804815 | Signaling aspects for UE capabilities | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.7 |
available | [WTS] [JSN] | ||
R1-1804816 | Considerations for UE feature support of 60kHz | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.8 |
withdrawn | [WTS] [JSN] | ||
R1-1804817 | Considerations for CQI and MCS for URLLC |
discussion revised to R1-1805511 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.2.1 |
revised | [WTS] [JSN] | ||
R1-1804818 | Considerations on new DCI format | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | ||
R1-1804819 | Considerations on PDCCH repetition | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | ||
R1-1804820 | eMBB and URLLC dynamic multiplexing and preemption indication on the uplink | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.2.4 |
noted | [WTS] [JSN] | ||
R1-1804821 | Impact of UE processing timeline on the URLLC performance | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | ||
R1-1804822 | On NTN initial access | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | ||
R1-1804823 | Transmitter side signaling processing schemes for NOMA | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.4.1 |
noted | [WTS] [JSN] | ||
R1-1804824 | Receivers for NOMA | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | ||
R1-1804825 | Procedures related to NOMA | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | ||
R1-1804826 | Link and system level evaluation for NOMA | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | ||
R1-1804827 | Evaluation scenarios for NR V2X use cases |
discussion revised to R1-1805590 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.5.1 |
revised | [WTS] [JSN] | ||
R1-1804828 | Simulation methodology for NR unlicensed | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | ||
R1-1804829 | Frame structure for NR-U operation | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | ||
R1-1804830 | Potential phy channel design for NR unlicensed | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | ||
R1-1804831 | Potential procedure design for NR unlicensed | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | ||
R1-1804832 | NR-U AUL | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | ||
R1-1804833 | Waveform options for 60GHz band | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | ||
R1-1804834 | Waveform under PSD limitation for NR-U | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | ||
R1-1804835 | Enhancements to support NR backhaul links | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.7.1 |
noted | [WTS] [JSN] | ||
R1-1804836 | Evaluation methodology for NR IAB | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.7.2 |
available | [WTS] [JSN] | ||
R1-1804837 | Waveform under PSD limitation for NR-U | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.6.5 |
withdrawn | [WTS] [JSN] | ||
R1-1804838 | Enhancements to support NR backhaul links | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.7.1 |
withdrawn | [WTS] [JSN] | ||
R1-1804839 | Evaluation methodology for NR IAB | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.7.2 |
withdrawn | [WTS] [JSN] | ||
R1-1804840 | Remaining Details for Physical Broadcast Channel | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1804841 | Remaining Details for Paging Channel | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1804842 | Remaining Details for Physical Random Access Channel | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1804843 | On Operation of Non-CB based UL Transmission | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1804844 | Remaining issues on CSI reporting | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804845 | Remaining issues on beam management | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804846 | Remaining issues on beam failure recovery | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804847 | Remaining issues on PT-RS | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1804848 | Remaining issues of search spaces | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1804849 | Remaining Issues on URLLC Data Channel Coding | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-1804850 | On Pathloss Correction during Beam Switch | discussion | InterDigital, Inc. |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1804851 | Remaining Details of CQI and MCS Tables for URLLC | discussion | InterDigital, Inc. |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1804852 | Evaluation of Compact DCI for URLLC | discussion | InterDigital, Inc. |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1804853 | Evaluation of PDCCH Repetition for URLLC | discussion | InterDigital, Inc. |
R1-92 AI: 7.2.3 |
noted | [WTS] [JSN] | |||
R1-1804854 | On Dynamic Resource Sharing between eMBB and URLLC in UL | discussion | InterDigital, Inc. |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804855 | Modeling of Tropospheric Scintillation Effects in NTN Channel Model | discussion | InterDigital, Inc. |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R1-1804856 | Simulation Results for PTRS Performance in Non-Terrestrial Networks | discussion | InterDigital, Inc. |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1804857 | Deactivating HARQ for Non-Terrestrial Networks | discussion | InterDigital, Inc. |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1804858 | Considerations on Timing Advance for NTN | discussion | InterDigital, Inc. |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1804859 | Implementation Aspects of Low Code Rate NOMA Schemes | discussion | InterDigital, Inc. |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1804860 | DMRS CHEST Error Model for NOMA Evaluation | discussion | InterDigital, Inc. |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1804861 | On Procedures Related to Non-orthogonal Multiple Access | discussion | InterDigital, Inc. |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1804862 | IDMA Link Level Simulation Results | discussion | InterDigital, Inc. |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1804863 | Discussion on System Level NOMA Evaluation | discussion | InterDigital, Inc. |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1804864 | On Operations for Non-orthogonal Multiple Access | discussion | InterDigital, Inc. |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1804865 | On V2X Evaluation Methodology | discussion | InterDigital, Inc. |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1804866 | V2X Sidelink Channel Model with Vehicle Blockage | discussion | InterDigital, Inc. |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1804867 | Consideration of NR-U Simulation Evaluation on 60 GHz Channels | discussion | InterDigital, Inc. |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1804868 | On Frame Structure for NR-U Operation | discussion | InterDigital, Inc. |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1804869 | On UL Physical Layer Channel Design for NR-U | discussion | InterDigital, Inc. |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1804870 | On Physical Layer Procedures for NR-U | discussion | InterDigital, Inc. |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1804871 | Correction on shortened processing time for 1ms TTI | discussion | Sharp |
R1-92 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1804872 | Early data transmission for MTC | other | Sharp |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | |||
R1-1804873 | Remaining issues for PUSCH sub-PRB allocation | other | Sharp |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | |||
R1-1804874 | On more flexible PDSCH/PUSCH resource allocation |
other revised to R1-1805286 |
Sharp |
R1-92 AI: 6.2.6.6 |
revised | [WTS] [JSN] | |||
R1-1804875 | Data transmission during random access procedure for NB-IoT | other | Sharp |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | |||
R1-1804876 | Uplink aspects of TDD NB-IoT | other | Sharp |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | |||
R1-1804877 | Remaining issues on RACH procedure | other | Sharp |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1804878 | Open issues on codeword mapping | other | Sharp |
R1-92 AI: 7.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1804879 | Clarification on aperiodic CSI reporting in CA case |
other revised to R1-1806943 |
Sharp |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804880 | Discussions on SRS resource transmission for BWP switch | other | Sharp |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1804881 | Remaining issues on slot format for NR | other | Sharp |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1804882 | Discussions on RB selection for PUCCH resource | other | Sharp |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1804883 | UCI multiplexing with NUCI based PUCCH resource set selection | other | Sharp |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1804884 | On Potential Waveform Solutions for NR-U | discussion | InterDigital, Inc. |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1804885 | On LBT for Beam-Based Transmission for NR-U | discussion | InterDigital, Inc. |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1804886 | On Synchronization Signal and PBCH for NR Unlicensed Spectrum | discussion | InterDigital, Inc. |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1804887 | On Random Access for NR Unlicensed Spectrum | discussion | InterDigital, Inc. |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1804888 | On Paging for NR Unlicensed Spectrum | discussion | InterDigital, Inc. |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1804889 | Consideration on TBS determination | discussion | ZTE, Sanechips |
R1-92 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-1804890 | TDD NB-IoT coexistence with NR | discussion | SoftBank Corp. |
R1-92 AI: 6.2.7.6.3 |
available | [WTS] [JSN] | |||
R1-1804891 | Ordering of P-CSI plus SR in eCA |
draftCR revised to R1-1805298 |
Qualcomm Incorporated | LTE_CA_enh_b5C-Core | Rel-13 |
R1-92 AI: 6.1.1 |
revised | [WTS] [JSN] | |
R1-1804892 | On support of advanced CSI |
discussion revised to R1-1805304 |
Qualcomm Incorporated |
R1-92 AI: 6.1.4 |
noted | [WTS] [JSN] | |||
R1-1804893 | Clarification on CSS monitoring for 5MHz operation | draftCR | Qualcomm Incorporated | LTE_feMTC-Core | Rel-14 |
R1-92 AI: 6.1.5 |
noted | [WTS] [JSN] | |
R1-1804894 | Correction to timing advance | draftCR | Qualcomm Incorporated | LTE_MTCe2_L1-Core, TEI14 | Rel-14 |
R1-92 AI: 6.1.5 |
noted | [WTS] [JSN] | |
R1-1804895 | Collision with NPRACH in non-anchor carriers |
draftCR revised to R1-1805279 |
Qualcomm Incorporated | NB_IOTenh2-Core | Rel-14 |
R1-92 AI: 6.1.6 |
revised | [WTS] [JSN] | |
R1-1804896 | On NPRS performance | discussion | Qualcomm Incorporated |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | |||
R1-1804897 | Considerations for DL quality reporting in msg3 for NB-IoT | discussion | Qualcomm Incorporated |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | |||
R1-1804898 | On NRS presence in non-anchor carriers |
discussion revised to R1-1805369 |
Qualcomm Incorporated |
R1-92 AI: 6.1.6 |
endorsed | [WTS] [JSN] | |||
R1-1804899 | UL Compensation gaps for multiple HARQ | discussion | Qualcomm Incorporated |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | |||
R1-1804900 | Issues for SRS Carrier switching | discussion | Qualcomm Incorporated |
R1-92 AI: 6.1.7 |
endorsed | [WTS] [JSN] | |||
R1-1804901 | Aspects related to interaction between different TTI lengths | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.1.2.1 |
noted | [WTS] [JSN] | |||
R1-1804902 | Aspects related to DL control channel | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.1.2.2 |
noted | [WTS] [JSN] | |||
R1-1804903 | Aspects related to UL control channel | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.1.2.3 |
noted | [WTS] [JSN] | |||
R1-1804904 | Aspects related to DL data channel |
discussion revised to R1-1805269 |
Qualcomm Incorporated |
R1-92 AI: 6.2.1.2.4 |
revised | [WTS] [JSN] | |||
R1-1804905 | Aspects related to UL data channel |
discussion revised to R1-1805270 |
Qualcomm Incorporated |
R1-92 AI: 6.2.1.2.5 |
revised | [WTS] [JSN] | |||
R1-1804906 | UE Categories for 1024QAM | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.3.2 |
available | [WTS] [JSN] | |||
R1-1804907 | Mode 4 support with V2X PC5 Carrier Aggregation | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1804908 | Synchronization for V2X PC5 Carrier Aggregation | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1804909 | Transmit Diversity for V2X Phase 2 | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |||
R1-1804910 | Resource pool sharing between Mode 3 and Mode 4 | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1804911 | Reduction of time between packet arrival and transmission | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1804912 | Reduced system acquisition time | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.6.1 |
available | [WTS] [JSN] | |||
R1-1804913 | Physical layer aspects of early data transmission | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.6.2 |
available | [WTS] [JSN] | |||
R1-1804914 | Efficient monitoring of DL control channels | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1804915 | Uplink HARQ-ACK feedback | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | |||
R1-1804916 | Sub-PRB allocation for eFeMTC | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | |||
R1-1804917 | Flexible allocation for PDSCH and PUSCH | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.6.6 |
available | [WTS] [JSN] | |||
R1-1804918 | Wake-up signal functions | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1804919 | Wake-up signal configurations and procedures | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.1.1.2 |
available | [WTS] [JSN] | |||
R1-1804920 | Wake-up signal design | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1804921 | Physical layer aspects of data transmission during random access procedure | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | |||
R1-1804922 | Physical layer scheduling request | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.1.3 |
available | [WTS] [JSN] | |||
R1-1804923 | Support of SPS | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | |||
R1-1804924 | Enhancements to cell search | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.2.1 |
available | [WTS] [JSN] | |||
R1-1804925 | Enhancements to system information acquisiton | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.2.2 |
available | [WTS] [JSN] | |||
R1-1804926 | Improvement of PHY measurements | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.3 |
available | [WTS] [JSN] | |||
R1-1804927 | NPRACH support for large cell access | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.5.2 |
available | [WTS] [JSN] | |||
R1-1804928 | NPRACH Reliability Enhancement |
discussion revised to R1-1805297 |
Qualcomm Incorporated |
R1-92 AI: 6.2.7.5.1 |
revised | [WTS] [JSN] | |||
R1-1804929 | Downlink aspects of TDD | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.6.1 |
available | [WTS] [JSN] | |||
R1-1804930 | Uplink aspects of TDD | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | |||
R1-1804931 | General considerations on TDD design | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.6.3 |
available | [WTS] [JSN] | |||
R1-1804932 | Coexistence with NR | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.7.6 |
available | [WTS] [JSN] | |||
R1-1804933 | Downlink Enhancements for URLLC |
discussion revised to R1-1805271 |
Qualcomm Incorporated |
R1-92 AI: 6.2.8.1 |
revised | [WTS] [JSN] | |||
R1-1804934 | Uplink Enhancements for URLLC | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.8.2 |
available | [WTS] [JSN] | |||
R1-1804935 | PCFICH Enhancements for URLLC | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.8.3 |
noted | [WTS] [JSN] | |||
R1-1804936 | UL power control enhancements for aerial vehicles | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.9.1 |
available | [WTS] [JSN] | |||
R1-1804937 | SRS antenna switching for 1T4R and 2T4R |
discussion revised to R1-1805278 |
Qualcomm Incorporated |
R1-92 AI: 6.2.11 |
revised | [WTS] [JSN] | |||
R1-1804938 | Discussion on modulation enhancements | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.11 |
noted | [WTS] [JSN] | |||
R1-1804939 | Control plane latency reduction | discussion | Qualcomm Incorporated |
R1-92 AI: 6.2.11 |
available | [WTS] [JSN] | |||
R1-1804940 | Consideration of compact DCI design for URLLC | discussion | China Unicom | Rel-15 |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | ||
R1-1804941 | Tx side processing for UL NOMA | discussion | NICT |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1804942 | Receivers for UL NOMA | discussion | NICT |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1804943 | Discussion on compact DCI for NR URLLC | discussion | Beijing Xiaomi Mobile Software |
R1-92 AI: 7.2.2 |
noted | [WTS] [JSN] | |||
R1-1804944 | Discussion on PDCCH repetition for NR URLLC | discussion | Beijing Xiaomi Mobile Software |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1804945 | On UL multiplexing of transmission with different reliability requirements | discussion | Beijing Xiaomi Mobile Software | Rel-15 |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | ||
R1-1804946 | Discussions on DMRS | discussion | Mitsubishi Electric Co. |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1804947 | Discussions on UL multiplexing | discussion | Mitsubishi Electric Co. |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804948 | Discussions on multiplexing of different types of RSs | discussion | Mitsubishi Electric Co. |
R1-92 AI: 7.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1804949 | What is "initial access" in RAN1? |
discussion revised to R1-1806914 |
Panasonic |
R1-92 AI: 7.1.1.6 |
available | [WTS] [JSN] | |||
R1-1804950 | Collision between SSB and PDCCH |
discussion revised to R1-1806915 |
Panasonic |
R1-92 AI: 7.1.3.1.1 |
available | [WTS] [JSN] | |||
R1-1804951 | Channel estimation complexity and search space | discussion | Panasonic |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1804952 | Inconsistent PDCCH detection |
discussion revised to R1-1806918 |
Panasonic |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1804953 | Discussion and draft LS response to SI reception in BWP | discussion | Motorola Mobility, Lenovo |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1804954 | Remaining details on random access procedure | discussion | Motorola Mobility, Lenovo |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1804955 | Remaining details on radio link monitoring |
discussion revision of R1-1802677 |
Motorola Mobility, Lenovo |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1804956 | Remaining details on PUCCH resource allocation | discussion | Motorola Mobility, Lenovo |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1804957 | Multiplexing of URLLC and eMBB uplink channels |
discussion revision of R1-1802680 |
Motorola Mobility, Lenovo |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804958 | PDSCH aspects of LTE-URLLC | discussion | Motorola Mobility, Lenovo |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | |||
R1-1804959 | Remaining Details on non-CA NR UL power control | discussion | Motorola Mobility, Lenovo |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1804960 | On CA-related NR UL power control |
discussion revision of R1-1802679 |
Motorola Mobility, Lenovo |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1804961 | On DL 4-layer MIMO supporting | discussion | China Unicom |
R1-92 AI: 7.1.7 |
available | [WTS] [JSN] | |||
R1-1804962 | [Draft] Reply LS on SI Reception in BWP |
LS out source LS: R2-1804109 LS To: RAN2 |
MediaTek Inc. | Rel-15 |
R1-92 AI: 5 |
available | [WTS] [JSN] | ||
R1-1804963 | Disscussion on UL multiplexing of transmissions with different reliability requirements | discussion | China Unicom |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1804964 | Correction on number of subframes for semistatic codebook determination and transmission over PUSCH |
draftCR revised to R1-1805301 |
Qualcomm Incorporated | LTE_CA_enh_b5C-Core | Rel-13 |
R1-92 AI: 6.1.1 |
revised | [WTS] [JSN] | |
R1-1804965 | On DMRS groups in Rel-15 |
discussion revised to R1-1806222 |
Ericsson |
R1-92 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-1804966 | Corrections for UL Antenna Port Identification |
discussion revised to R1-1806209 |
Ericsson |
R1-92 AI: 7.1.2.1 |
available | [WTS] [JSN] | |||
R1-1804967 | Remaining issues on CW mapping and data scrambling | discussion | Ericsson |
R1-92 AI: 7.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1804968 | Corrections for Codebook Based UL MIMO | discussion | Ericsson |
R1-92 AI: 7.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1804969 | Corrections for Non-Codebook Based UL MIMO | discussion | Ericsson |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1804970 | Remaining issues on DL PRB bundling | discussion | Ericsson |
R1-92 AI: 7.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1804971 | UL precoder classification | discussion | Ericsson |
R1-92 AI: 7.1.2.1.5 |
available | [WTS] [JSN] | |||
R1-1804972 | Remaining issues on CSI measurement |
discussion revised to R1-1805267 |
Ericsson |
R1-92 AI: 7.1.2.2.1 |
revised | [WTS] [JSN] | |||
R1-1804973 | Remaining issues on CSI reporting | discussion | Ericsson |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1804974 | Remaining details of beam management |
discussion revised to R1-1806952 |
Ericsson |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1804975 | Remaining issues on beam recovery | discussion | Ericsson |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1804976 | Multi-cell beam recovery |
discussion revision of R1-1802745 revised to R1-1806221 |
Ericsson |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804977 | On simultaneous reception of physical and reference signals across CCs | discussion | Ericsson |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804978 | Remaining issues on SP CSI reporting on PUSCH | discussion | Ericsson |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804979 | Miscellaneous corrections and clarifications on CSI acquisition | discussion | Ericsson |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804980 | On OFDM symbol level PDSCH power boosting |
discussion revised to R1-1806953 |
Ericsson |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1804981 | Remaining issues on RS multiplexing | discussion | Ericsson |
R1-92 AI: 7.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1804982 | Remaining issues on CSI-RS | discussion | Ericsson |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1804983 | Remaining issues on DMRS | discussion | Ericsson |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1804984 | Remaining issues on PT-RS | discussion | Ericsson |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1804985 | Remaining issues on SRS | discussion | Ericsson |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1804986 | Remaining issues on TRS | discussion | Ericsson |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1804987 | Remaining issues on QCL | discussion | Ericsson |
R1-92 AI: 7.1.2.3.7 |
available | [WTS] [JSN] | |||
R1-1804988 | Analysis of periodic vs aperiodic TRS |
discussion revised to R1-1806235 |
Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804989 | Benefits of resource specific DMRS mapping |
discussion revised to R1-1806231 |
Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804990 | Evaluations of TRS periodicity |
discussion revision of R1-1802761 revised to R1-1806237 |
Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804991 | Lossless compression of scheduling BW thresholds for PT-RS | discussion | Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804992 | On correlation of DMRS Gold sequences |
discussion revision of R1-1802760 revised to R1-1806232 |
Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804993 | On UE TX frequency accuracy with TRS based synchronization |
discussion revision of R1-1802763 |
Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804994 | TP for TS 38.212 related to aperiodic and semi-persistent TRS | discussion | Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804995 | TP for TS 38.214 related to DMRS sequence | discussion | Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804996 | Type 1 mapping of halp-pi BPSK DFTS DMRS |
discussion revision of R1-1802764 revised to R1-1806234 |
Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804997 | On a resource specific sequence mapping for CSI-RS |
discussion revision of R1-1802732 revised to R1-1806236 |
Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804998 | On correlation of CSI-RS Gold sequences |
discussion revision of R1-1802759 |
Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1804999 | On additional periodicities for CSI-RS and SRS | discussion | Ericsson |
R1-92 AI: 7.1.2.3.8 |
available | [WTS] [JSN] | |||
R1-1805000 | NR UE feature list for MIMO and RS | discussion | Ericsson |
R1-92 AI: 7.1.2.4 |
available | [WTS] [JSN] | |||
R1-1805001 | On RRC parameter alignment between 38.214 and 38.331 | discussion | Ericsson |
R1-92 AI: 7.1.2.4 |
available | [WTS] [JSN] | |||
R1-1805002 | Discussion on UE capability list | discussion | Ericsson |
R1-92 AI: 7.1.7 |
available | [WTS] [JSN] | |||
R1-1805003 | Signature design for NoMA | discussion | Ericsson |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1805004 | NoMA receiver design | discussion | Ericsson |
R1-92 AI: 7.4.2 |
noted | [WTS] [JSN] | |||
R1-1805005 | Procedures related to NoMA | discussion | Ericsson |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1805006 | Evaluation methodology and metrics for NoMA | discussion | Ericsson |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1805007 | Observations on NOMA traffic models |
discussion revised to R1-1806245 |
Ericsson |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1805008 | NR-U evaluation methodology | discussion | Ericsson |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1805009 | On Frame Structure for NR in Unlicensed Spectrum | discussion | Ericsson |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1805010 | Physical layer channel design for NR unlicensed operation | discussion | Ericsson |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | |||
R1-1805011 | Physical layer procedures for NR unlicensed operation | discussion | Ericsson |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1805012 | On SRS design for NR unlicensed operation |
discussion revised to R1-1806260 |
Ericsson |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1805013 | On the Introduction of a Discovery Reference Signal | discussion | Ericsson |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1805014 | On NR operation in 60GHz unlicensed band |
discussion revised to R1-1806257 |
Ericsson |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1805015 | Numerology for NR operation in unlicensed spectrum | discussion | Ericsson |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1805016 | On Autonomous UL Transmissions for NR in Unlicensed Spectrum |
discussion revision of R1-1802780 |
Ericsson |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1805017 | On PRACH for NR in Unlicensed Spectrum | discussion | Ericsson |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1805018 | On interlace design for NR-U uplink |
discussion revision of R1-1802776 |
Ericsson |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1805019 | Discussion on UL power control enhancements for aerial vehicles | discussion | Ericsson | Rel-15 |
R1-92 AI: 6.2.9.1 |
available | [WTS] [JSN] | ||
R1-1805020 | Evaluation results on extended range of UE specific P0 parameter | discussion | Ericsson | Rel-15 |
R1-92 AI: 6.2.9.2 |
available | [WTS] [JSN] | ||
R1-1805021 | On positioning for aerial vehicles | other | Ericsson |
R1-92 AI: 6.2.9.2 |
available | [WTS] [JSN] | |||
R1-1805022 | On carrier aggregation using mode 4 resource selection | discussion | NTT DOCOMO, INC. |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1805023 | Transmission diversity solutions | discussion | NTT DOCOMO, INC. |
R1-92 AI: 6.2.5.3.1 |
available | [WTS] [JSN] | |||
R1-1805024 | Resource pool sharing between Mode-3 UE and Mode-4 UE | discussion | NTT DOCOMO, INC. |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | |||
R1-1805025 | Reducing the maximum time between packet arrival and selected resource for data transmission | discussion | NTT DOCOMO, INC. |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1805026 | Views on UL HARQ-ACK feedback design | discussion | NTT DOCOMO, INC. |
R1-92 AI: 6.2.6.4 |
available | [WTS] [JSN] | |||
R1-1805027 | Views on PUSCH sub-PRB allocation for MTC | discussion | NTT DOCOMO, INC. |
R1-92 AI: 6.2.6.5 |
available | [WTS] [JSN] | |||
R1-1805028 | Views on SPS activation and deactivation mechanism | discussion | NTT DOCOMO, INC. |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | |||
R1-1805029 | Draft reply LS on Message 3 size for NR | discussion | NTT DOCOMO, INC. |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1805030 | Discussion for NR Message 3 size | discussion | NTT DOCOMO, INC. |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1805031 | Remaining issues on Synchronization signal | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1805032 | Remaining issues on NR-PBCH | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1805033 | Remaining issues on RMSI | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1805034 | Remaining issues on Paging design | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1805035 | Remaining issues on PRACH formats | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1805036 | Remaining issues on RACH procedure | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1805037 | Remaining issues on Measurement for mobility management | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1805038 | Remaining issues on RLM for mobility management | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1805039 | Remaining details on non-codebook based UL transmission | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1805040 | Remaining issues on CSI reporting | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1805041 | Remining Issues on Beam Management | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1805042 | Remaining issues on beam recovery | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1805043 | On Type II codebook enhancement |
discussion revision of R1-1802473 |
NTT DOCOMO, INC. |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1805044 | Remaining details on CSI-RS | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1805045 | Remaining details on DM-RS | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1805046 | Remaining details on PTRS | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1805047 | Remaining details on TRS | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1805048 | Search space | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1805049 | Remaining issues on group-common PDCCH | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1805050 | DCI contents and formats | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1805051 | PUCCH structure in short-duration | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1805052 | PUCCH structure in long-duration | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1805053 | UCI multiplexing on PUSCH | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1805054 | Resource allocation for PUCCH | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1805055 | Resource allocation and TBS determination | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1805056 | PUSCH time-domain resource allocation | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1805057 | UL data transmission procedure | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |||
R1-1805058 | Other aspects on bandwidth Parts | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1805059 | Remaining issues on HARQ-ACK codebook and CA | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1805060 | Remaining issues on PHR | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1805061 | Views on NR UE features | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.7 |
noted | [WTS] [JSN] | |||
R1-1805062 | Necessity of compact DCI | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1805063 | Necessity of PDCCH repetition | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1805064 | Handling UL multiplexing of transmissions with different reliability requirements | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1805065 | Transmitter design for uplink NOMA | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.4.1 |
available | [WTS] [JSN] | |||
R1-1805066 | Receiver candidate for uplink NOMA transmission | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1805067 | Initial views on procedures related to NOMA | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.4.3 |
noted | [WTS] [JSN] | |||
R1-1805068 | Discussion on comparison methodology and system-level evaluations for NOMA | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1805069 | Evaluation assumption for V2X phase 3 | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1805070 | Channel model for V2X phase 3 | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1805071 | Simulation Methodology for NR-U operation | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1805072 | Potential physical layer procedures for NR-U operation | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1805073 | Link to System Mapping for IMT-2020 Self-evaluation | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.8.1 |
available | [WTS] [JSN] | |||
R1-1805074 | Evaluation results of rural-eMBB for IMT-2020 self-evaluation | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805075 | Evaluation results of dense urban-eMBB for IMT-2020 self-evaluation | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805076 | Evaluation results of Indoor Hotspot-eMBB for IMT-2020 self-evaluation | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805077 | On channel models for eV2X | discussion | Cohere Technologies |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1805078 | NR-NTN: Link budget analysis | pCR | THALES | 38.811 0.3.0 | FS_NR_nonterr_nw | Rel-15 |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] |
R1-1805079 | NR-NTN: Potential areas of impact, chapter structure | pCR | THALES | 38.811 0.3.0 | FS_NR_nonterr_nw | Rel-15 |
R1-92 AI: 7.3.2 |
noted | [WTS] [JSN] |
R1-1805080 | DCI format 1_0 with X-RNTIs | discussion | Panasonic Corporation |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1805081 | Discussions on HARQ-ACK bundling and multiplexing | discussion | China Telecommunications |
R1-92 AI: 7.1.3.3.2 |
withdrawn | [WTS] [JSN] | |||
R1-1805082 | Multistage MMSE scheme for low complexity NOMA receivers | discussion | ESA, AIRBUS DS SLC |
R1-92 AI: 7.4.2 |
available | [WTS] [JSN] | |||
R1-1805083 | Ionospheric scintillations for NTN channel | discussion | ESA |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R1-1805084 | Tropospheric scintillations for NTN channel | discussion | ESA |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | |||
R1-1805085 | Physical-layer aspects related to IAB | discussion | Nanjing Ericsson Panda Com Ltd |
R1-92 AI: 7.7.1 |
available | [WTS] [JSN] | |||
R1-1805086 | IAB Simulation Evaluation Methodology and KPIs | discussion | Nanjing Ericsson Panda Com Ltd |
R1-92 AI: 7.7.2 |
noted | [WTS] [JSN] | |||
R1-1805087 | Clarification for sPDSCH rate matching behavior with two SPDCCH PRB set | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.1.2.2 |
withdrawn | [WTS] [JSN] | ||
R1-1805088 | Clarification for assumption in SPT with CSS and USS overlap | discussion | MediaTek Inc. | Rel-15 |
R1-92 AI: 6.2.1.2.2 |
noted | [WTS] [JSN] | ||
R1-1805089 | NR-NTN: Impact of channel frequency selectivity on DM-RS distribution (frequency) | pCR | THALES | 38.811 0.3.0 | FS_NR_nonterr_nw | Rel-15 |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] |
R1-1805090 | Discussion on eV2X use cases |
other revised to R1-1806153 |
Ericsson LM |
R1-92 AI: 7.5.3 |
available | [WTS] [JSN] | |||
R1-1805091 | Remaining issues on synchronization for CA in V2X Phase 2 | other | ITL |
R1-92 AI: 6.2.5.1.2 |
available | [WTS] [JSN] | |||
R1-1805092 | Waveform considerations for NR-U in the 60GHz band |
discussion revised to R1-1805989 |
Mitsubishi Electric RCE | Rel-15 |
R1-92 AI: 7.6.3 |
available | [WTS] [JSN] | ||
R1-1805093 | Discussion on network topology for sub-7GHz coexistence evaluations between NR-U and Wi-Fi |
discussion revised to R1-1805555 |
Broadcom, Cisco, HPE |
R1-92 AI: 7.6.1 |
revised | [WTS] [JSN] | |||
R1-1805094 | NR-NTN: Impact of Doppler variation rate on DM-RS distribution (time) | pCR | THALES | 38.811 0.3.0 | FS_NR_nonterr_nw | Rel-15 |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] |
R1-1805095 | NR-NTN: Impact on Initial TA during random access procedure | pCR | THALES | 38.811 0.3.0 | FS_NR_nonterr_nw | Rel-15 |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] |
R1-1805096 | DCI format for URLLC | discussion | China Telecommunications |
R1-92 AI: 7.2.2 |
available | [WTS] [JSN] | |||
R1-1805097 | Preliminary evaluation of link level performance for LDPC coding | discussion | China Telecommunications |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805098 | UL Multiplexing for Transmissions of different Reliabilities |
discussion revised to R1-1807406 |
TCL Communication |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1805099 | Draft LS Response to RAN2 on Beam- and Cell- Radio-Link-Monitoring | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1805100 | Remaining Issue on DMRS Port Mapping and its Impact on CQI/MCS | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1805101 | Remaining issues on UL codebook based transmission | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1805102 | Remaining issues on non-codebook based UL-MIMO transmission | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1805103 | Remaining Details on the CSI Framework | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1805104 | Remaining issues on beam management | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1805105 | Remaining Details on Beam Recovery | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1805106 | Remaining Issue on Type II CSI Omission | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1805107 | On channels multiplexing | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.2.6 |
available | [WTS] [JSN] | |||
R1-1805108 | Remaining issues on CSI-RS design | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1805109 | Further comments on DM-RS for NR physical data channels | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1805110 | Further comments on PT-RS | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1805111 | Remaining details on SRS design in NR | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1805112 | Remaining details of TRS design | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | |||
R1-1805113 | Channel Access Procedure for NR on Unlicensed Band | discussion | Shenzhen Coolpad Technologies |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1805114 | NR-NTN channel modeling - Flat fading criteria | discussion | THALES | Rel-15 |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | ||
R1-1805115 | NR-NTN Channel Modeling – Large scale parameters | discussion | THALES | Rel-15 |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | ||
R1-1805116 | NR-NTN Channel Modeling – Text proposal for the 6th clause of TR38.811 |
discussion revised to R1-1805680 |
THALES | Rel-15 |
R1-92 AI: 7.3.1 |
revised | [WTS] [JSN] | ||
R1-1805117 | Correction of number of UL HARQ processes for shorter TTI and shortened processing time (36.213) - TP#14 | other | Nokia, Nokia Shanghai Bell, Ericsson, Intel |
R1-92 AI: 6.2.1.2.5 |
available | [WTS] [JSN] | |||
R1-1805118 | HARQ ID definition to TDD UL index based PUSCH scheduling for SPT in 36.213 - TP#15 | discussion | Nokia, Nokia Shanghai Bell, Ericsson |
R1-92 AI: 6.2.1.1 |
endorsed | [WTS] [JSN] | |||
R1-1805119 | Retaining UL index based scheduling flexibility for SPT without UpPTS PUSCH (36.213) - TP#16 | discussion | Nokia, Nokia Shanghai Bell, Ericsson |
R1-92 AI: 6.2.1.1 |
endorsed | [WTS] [JSN] | |||
R1-1805120 | Needed correction in 36.213 of applicability of TDD UL PUSCH timing for SPT - TP#17 | discussion | Nokia, Nokia Shanghai Bell, Qualcomm |
R1-92 AI: 6.2.1.1 |
endorsed | [WTS] [JSN] | |||
R1-1805121 | Support for RRC configurable DM-RS CS for 1ms TTI UL SPS - TP#19 | discussion | Nokia, Nokia Shanghai Bell, Ericsson |
R1-92 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1805122 | Enabling transmit diversity fallback for DL TM 6 for shorter TTI (36.212, 36.213) - TP#20 | other | Nokia, Nokia Shanghai Bell, Ericsson, LG Electronics, Intel, Qualcomm |
R1-92 AI: 6.2.1.2.4 |
available | [WTS] [JSN] | |||
R1-1805123 | Enabling transmit diversity fallback for DL TM 8 for shorter TTI (36.212, 36.213) - TP#21 | other | Nokia, Nokia Shanghai Bell, Ericsson, LG Electronics |
R1-92 AI: 6.2.1.2.4 |
available | [WTS] [JSN] | |||
R1-1805124 | Enabling transmit diversity fallback for DL TM 9 and 10 for shorter TTI (36.212, 36.213) - TP#22 | other | Nokia, Nokia Shanghai Bell, LG Electronics |
R1-92 AI: 6.2.1.2.4 |
noted | [WTS] [JSN] | |||
R1-1805125 | Changes to FS2 SRS triggering for shorter TTI (36.212, 36.213) - TP#23 | other | Nokia, Nokia Shanghai Bell, Ericsson, Huawei, LG Electronics |
R1-92 AI: 6.2.1.2.6 |
available | [WTS] [JSN] | |||
R1-1805126 | Corrections on DM-RS for slot PDSCH (36.211) - TP#24 | other | Nokia, Nokia Shanghai Bell, Ericsson, LG Electronics |
R1-92 AI: 6.2.1.2.4 |
available | [WTS] [JSN] | |||
R1-1805127 | Corrections and simplifications of K_PUSCH for FS2 slot-PUSCH in 36.213 - TP#25 |
other revised to R1-1805375 |
Nokia, Nokia Shanghai Bell, Ericsson |
R1-92 AI: 6.2.1.2.6 |
revised | [WTS] [JSN] | |||
R1-1805128 | Correction in 36.213 to TDD UL index based slot PUSCH scheduling - TP#26 | other | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.1.2.6 |
available | [WTS] [JSN] | |||
R1-1805129 | EPDCCH monitoring restrictions for shorter TTI operation (36.213) - TP#45 | discussion | Nokia, Nokia Shanghai Bell, Huawei, LG Electronics, Mediatek, Intel |
R1-92 AI: 6.2.1.2.2 |
noted | [WTS] [JSN] | |||
R1-1805130 | NTN NR impacts due to phase noise |
discussion revision of R1-1802797 |
Fraunhofer IIS |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1805131 | Remaining Issues on Overlapping of HARQ-ACK and SR | discussion | III |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1805132 | TBS Determination for Early Data Transmission | discussion | III |
R1-92 AI: 6.2.7.1.2 |
available | [WTS] [JSN] | |||
R1-1805133 | Scheduling Aspects of TDD NB-IoT | discussion | III |
R1-92 AI: 6.2.7.6.3 |
available | [WTS] [JSN] | |||
R1-1805134 | Open issues related to Synchronisation Signal | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1805135 | Remaining details related to SS/PBCH block | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1805136 | Remaining issues on RMSI | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1805137 | On BWP for Other System Information Delivery | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1805138 | BWP determination for paging message delivery | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1805139 | Remaining issues on mobility measurements | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1805140 | Remaining Details on Radio Link Monitoring | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1805141 | Draft CR to 38.300 on functionality related to 38.21x | draftCR | Editor (Nokia) | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7 |
endorsed | [WTS] [JSN] | |
R1-1805142 | Open issues on time domain resource allocation | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1805143 | Power control for EN-DC option 4 | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.5 |
noted | [WTS] [JSN] | |||
R1-1805144 | On Evaluation of the Mobility Parameter for IMT-202 |
discussion revised to R1-1805276 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.8.1 |
revised | [WTS] [JSN] | |||
R1-1805145 | Spectral Efficiency Results for the IMT-2020 Self-Evaluation | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805146 | Missing agreements from agreed text proposals at RAN1#92 | discussion | Ericsson, LG Electronics |
R1-92 AI: 6.2.1 |
noted | [WTS] [JSN] | |||
R1-1805147 | Text proposal on 1ms HARQ bits inclusion in UL sTTI in case of SPS and HARQ process sharing |
discussion revised to R1-1805354 |
Ericsson |
R1-92 AI: 6.2.1.2.1 |
revised | [WTS] [JSN] | |||
R1-1805148 | Text proposal on TPC timing with DCI format 3/3A and short TTI operation | discussion | Ericsson, LG Electronics, Nokia, Nokia Shanghai Bell, Qualcomm |
R1-92 AI: 6.2.1.2.5 |
available | [WTS] [JSN] | |||
R1-1805149 | TP to 36.211 Excluding TDM support for subslot CRS-based SPDCCH and DMRS-based PDSCH | discussion | Ericsson, Nokia, Nokia Shanghai Bell, Intel, Huawei, HiSilicon, Qualcomm, LG Electronics |
R1-92 AI: 6.2.1.2.2 |
endorsed | [WTS] [JSN] | |||
R1-1805150 | Clarification on HARQ sequence for sPT, FS1 and fixed codebook size (36.212) | discussion | Ericsson, Qualcomm |
R1-92 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1805151 | Considerations of DMRS design with large number of UEs | discussion | ETRI |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1805152 | Initial LLS results for low-rate code and signature based shared access NOMA scheme | discussion | ETRI |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1805153 | TBS determination for partial UL subframes |
discussion revised to R1-1807007 |
Lenovo, Motorola Mobility | Rel-15 |
R1-92 AI: 6.2.2.3 |
noted | [WTS] [JSN] | ||
R1-1805154 | Collision of AUL and granted transmissions | discussion | Lenovo, Motorola Mobility | Rel-15 |
R1-92 AI: 6.2.2.3 |
available | [WTS] [JSN] | ||
R1-1805155 | On uplink multiplexing of transmissions with different reliability requirements |
other revision of R1-1802926 |
KDDI Corporation |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1805156 | Remaining details on NR PUSCH power control | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1805157 | Considerations for PUCCH reliability |
discussion revision of R1-1718723 revised to R1-1806921 |
Sequans Communications |
R1-92 AI: 7.2.5 |
available | [WTS] [JSN] | |||
R1-1805158 | Considerations for UL multiplexing with different reliability requirements |
discussion revision of R1-1802885 revised to R1-1806919 |
Sequans Communications |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1805159 | On UE Capabilities for LTE_unlic | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.2.3 |
agreed | [WTS] [JSN] | |||
R1-1805160 | Correction to UE behavior in case simultaneous subslot/slot and subframe PDSCH decoding is not supported (36.213) | discussion | Ericsson, Nokia, Huawei |
R1-92 AI: 6.2.1.2.4 |
endorsed | [WTS] [JSN] | |||
R1-1805161 | Correction to UE sounding procedures (36.213) |
discussion revised to R1-1805310 |
Ericsson |
R1-92 AI: 6.2.1.2.3 |
revised | [WTS] [JSN] | |||
R1-1805162 | URLLC techniques for PDSCH | discussion | Ericsson |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | |||
R1-1805163 | UL SPS PUSCH performance and HARQ ambiguity resolution | discussion | Ericsson |
R1-92 AI: 6.2.8.2 |
available | [WTS] [JSN] | |||
R1-1805164 | Latency for URLLC | discussion | Ericsson |
R1-92 AI: 6.2.8.3 |
available | [WTS] [JSN] | |||
R1-1805165 | Reliability for URLLC | discussion | Ericsson |
R1-92 AI: 6.2.8.3 |
available | [WTS] [JSN] | |||
R1-1805166 | On Pre-emption in DL | discussion | Ericsson |
R1-92 AI: 6.2.8.3 |
available | [WTS] [JSN] | |||
R1-1805167 | On Pre-emption in UL | discussion | Ericsson |
R1-92 AI: 6.2.8.3 |
available | [WTS] [JSN] | |||
R1-1805168 | On PUCCH/SPUCCH reliability for URLLC | discussion | Ericsson |
R1-92 AI: 6.2.8.3 |
available | [WTS] [JSN] | |||
R1-1805169 | Resource allocation for aerial vehicle |
discussion revision of R1-1720472 |
Sony |
R1-92 AI: 6.2.9.2 |
available | [WTS] [JSN] | |||
R1-1805170 | RSSI distribution of Indoor Enterprise Wi-Fi network data | discussion | Charter Communications, Broadcom |
R1-92 AI: 7.6.1 |
withdrawn | [WTS] [JSN] | |||
R1-1805171 | Corrections to sTTI and SPT implementation |
CR revised to R1-1805394 |
Ericsson | 36.211 15.1.0 CR#4281 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
revised | [WTS] [JSN] |
R1-1805172 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE |
draftCR revision of R1-1803864 revised to R1-1805314 |
Ericsson | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
revised | [WTS] [JSN] | |
R1-1805173 | Introduction of PUSCH sub-PRB allocation |
draftCR revision of R1-1803862 |
Ericsson | LTE_feMTC-Core | Rel-15 |
R1-92 AI: 6.2.6 |
available | [WTS] [JSN] | |
R1-1805174 | Draft CR 36.211, Introduction Rel-15 Further NB-IoT enhancements |
draftCR revision of R1-1803863 |
Ericsson | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 6.2.7 |
available | [WTS] [JSN] | |
R1-1805175 | Draft CR to 38.211 | discussion | Ericsson |
R1-92 AI: 7.1 |
withdrawn | [WTS] [JSN] | |||
R1-1805176 | Further Notes for DCI Size Discussion | discussion | Ericsson |
R1-92 AI: 7.1.3.1 |
available | [WTS] [JSN] | |||
R1-1805177 | On remaining issues of PDCCH structure | discussion | Ericsson |
R1-92 AI: 7.1.3.1.1 |
available | [WTS] [JSN] | |||
R1-1805178 | On remaining issues of search space | discussion | Ericsson |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1805179 | On remaining issues of GC-PDCCH | discussion | Ericsson |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1805180 | On remaining issues of DCI | discussion | Ericsson |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1805181 | TP for remaining issues of GC-PDCCH | discussion | Ericsson |
R1-92 AI: 7.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1805182 | TP for remaining issues of DCI | discussion | Ericsson |
R1-92 AI: 7.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1805183 | On UCI Multiplexing on PUCCH | discussion | Ericsson |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |||
R1-1805184 | On PUCCH Remaining Issues | discussion | Ericsson |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1805185 | On UCI Multiplexing on PUSCH | discussion | Ericsson |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1805186 | On PUCCH Resource Allocation | discussion | Ericsson |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1805187 | TP on UCI Multiplexing on PUSCH | discussion | Ericsson |
R1-92 AI: 7.1.3.2.5 |
available | [WTS] [JSN] | |||
R1-1805188 | On DL/UL resource allocation |
discussion revised to R1-1805506 |
Ericsson |
R1-92 AI: 7.1.3.3.1 |
revised | [WTS] [JSN] | |||
R1-1805189 | On remaining issues of scheduling and HARQ management | discussion | Ericsson |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1805190 | On remaining issues for CBG based HARQ | discussion | Ericsson |
R1-92 AI: 7.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1805191 | On UL data transmission procedure |
discussion revised to R1-1805507 |
Ericsson |
R1-92 AI: 7.1.3.3.4 |
revised | [WTS] [JSN] | |||
R1-1805192 | Multiplexing data with different durations | discussion | Ericsson |
R1-92 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1805193 | [DRAFT] Reply LS on formula or table for L1 data rate | discussion | Ericsson |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1805194 | TP on RAR grant resource allocation | discussion | Ericsson |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1805195 | TP on default resource allocation table and MSG3 table | discussion | Ericsson |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1805196 | TP for remaining issues of scheduling and HARQ management | discussion | Ericsson |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1805197 | TP for DL and UL semi-persistent scheduling | discussion | Ericsson |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1805198 | [DRAFT] Reply LS on LTE peak data-rate calculation for EN-DC |
discussion revised to R1-1806384 |
Ericsson |
R1-92 AI: 7.1.3.3.7 |
available | [WTS] [JSN] | |||
R1-1805199 | On BWP adaptation | discussion | Ericsson |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1805200 | On remaining issues of carrier aggregation | discussion | Ericsson |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1805201 | TP on remaining issues of carrier aggregation | discussion | Ericsson |
R1-92 AI: 7.1.3.6 |
available | [WTS] [JSN] | |||
R1-1805202 | Remaining issues for NR power control | discussion | Ericsson |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |||
R1-1805203 | Remaining issues for CA and power sharing | discussion | Ericsson |
R1-92 AI: 7.1.6.2 |
available | [WTS] [JSN] | |||
R1-1805204 | Remaining issues on closed loop power control | discussion | Ericsson |
R1-92 AI: 7.1.6.3 |
available | [WTS] [JSN] | |||
R1-1805205 | Power control for UL MIMO | discussion | Ericsson |
R1-92 AI: 7.1.6.3 |
available | [WTS] [JSN] | |||
R1-1805206 | Corrections to 38.212 | discussion | Ericsson |
R1-92 AI: 7.1.8 |
available | [WTS] [JSN] | |||
R1-1805207 | Corrections to 38.213 | discussion | Ericsson |
R1-92 AI: 7.1.8 |
available | [WTS] [JSN] | |||
R1-1805208 | Corrections to 38.214 | discussion | Ericsson |
R1-92 AI: 7.1.8 |
available | [WTS] [JSN] | |||
R1-1805209 | Considerations on NoMA Performance Evaluation | discussion | Vodafone Group Plc |
R1-92 AI: 7.4.4 |
noted | [WTS] [JSN] | |||
R1-1805210 | Introduction of reduced control plane latency |
draftCR revised to R1-1805325 |
Ericsson | TEI15 | Rel-15 |
R1-92 AI: 6.2.11 |
revised | [WTS] [JSN] | |
R1-1805211 | Control Plane latency reduction | discussion | Ericsson |
R1-92 AI: 6.2.11 |
available | [WTS] [JSN] | |||
R1-1805212 | [DRAFT] Reply LS on CP latency reduction |
LS out LS To: RAN2 revised to R1-1805321 |
Ericsson | TEI15 | Rel-15 |
R1-92 AI: 6.2.11 |
revised | [WTS] [JSN] | |
R1-1805213 | Draft LS reponse to RAN2 on Beam- and Cell- Radio-Link-Monitoring |
LS out LS is reply to R1-1803577 (R2-1804066) LS To: RAN2 |
Ericsson |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1805214 | Draft LS reponse to RAN2 on Message 3 size for NR |
LS out LS is reply to R1-1803582 (R2-1804073) LS To: RAN2 |
Ericsson |
R1-92 AI: 5 |
available | [WTS] [JSN] | |||
R1-1805215 | Remaining details on Synchronization signal | discussion | Ericsson |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | |||
R1-1805216 | Remaining details of PBCH | discussion | Ericsson |
R1-92 AI: 7.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1805217 | Remaining minimum system information | discussion | Ericsson |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1805218 | On other system information delivery | discussion | Ericsson |
R1-92 AI: 7.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1805219 | Remaining details on paging design | discussion | Ericsson |
R1-92 AI: 7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1805220 | Remaining details of RACH configurations | discussion | Ericsson |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1805221 | Remaining details of RACH procedure | discussion | Ericsson |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1805222 | Remaining issues on mobility measurements | discussion | Ericsson |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1805223 | Remaining issues for radio link monitoring | discussion | Ericsson |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1805224 | On multiple preamble transmissions for contention free random access |
discussion revision of R1-1802950 revised to R1-1806428 |
Ericsson |
R1-92 AI: 7.1.1.6 |
available | [WTS] [JSN] | |||
R1-1805225 | L1 reporting on other cells |
discussion revision of R1-1802951 revised to R1-1806429 |
Ericsson |
R1-92 AI: 7.1.1.6 |
available | [WTS] [JSN] | |||
R1-1805226 | On IMT-2020 Evaluation methodology |
discussion revised to R1-1806430 |
Ericsson |
R1-92 AI: 7.8.1 |
available | [WTS] [JSN] | |||
R1-1805227 | An overview of the IMT-2020 Evaluations |
discussion revised to R1-1806431 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805228 | IMT 2020 Evaluations: On eMBB spectral efficiency with NR |
discussion revised to R1-1805503 |
Ericsson |
R1-92 AI: 7.8.2 |
revised | [WTS] [JSN] | |||
R1-1805229 | IMT 2020 Evaluations: On eMBB user experienced data rate with NR |
discussion revised to R1-1806434 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805230 | IMT 2020 Evaluations: On eMBB area traffic capacity with NR |
discussion revised to R1-1806435 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805231 | IMT-2020 self-evaluation: mMTC non-full-buffer connection density |
discussion revised to R1-1806436 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805232 | IMT-2020 self-evaluation: mMTC full buffer connection density |
discussion revised to R1-1806437 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805233 | IMT-2020 self-evaluation: Mobility evaluations for NR |
discussion revised to R1-1806438 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805234 | IMT-2020 self-evaluation: Peak data rate and peak spectrum efficiency evaluations for NR |
discussion revision of R1-1802957 revised to R1-1806439 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805235 | IMT-2020 self evaluation: Radio Network Energy Performance |
discussion revision of R1-1802954 revised to R1-1806440 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805236 | IMT 2020 Evaluations - CP latency in NR |
discussion revision of R1-1802977 revised to R1-1806441 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805237 | IMT 2020 Evaluations - UP latency in NR |
discussion revision of R1-1802979 revised to R1-1806442 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805238 | IMT 2020 Evaluations - Reliability in NR |
discussion revision of R1-1802979 revised to R1-1806443 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805239 | Remaining issues on channel access for UL partial subframe on LAA Scell | discussion | WILUS Inc. |
R1-92 AI: 6.2.2.1 |
noted | [WTS] [JSN] | |||
R1-1805240 | Remaining issues on group-common PDCCH for NR | discussion | WILUS Inc. |
R1-92 AI: 7.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1805241 | Discussion on DCI contents and formats | discussion | WILUS Inc. |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |||
R1-1805242 | Remaining issues on long PUCCH over multiple slots | discussion | WILUS Inc. |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1805243 | Remaining issues on UCI multiplexing between PUCCH and PUSCH | discussion | WILUS Inc. |
R1-92 AI: 7.1.3.2.3 |
withdrawn | [WTS] [JSN] | |||
R1-1805244 | Remaining issues on BWP switching | discussion | WILUS Inc. |
R1-92 AI: 7.1.3.4.1 |
available | [WTS] [JSN] | |||
R1-1805245 | Remaining issues on HARQ-ACK codebook construction | discussion | WILUS Inc. |
R1-92 AI: 7.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1805246 | UCI multiplexing considering URLLC data in PUSCH | discussion | WILUS Inc. |
R1-92 AI: 7.2.4 |
available | [WTS] [JSN] | |||
R1-1805247 | Discussion on coexistence between NR-U and 802.11ax | discussion | Broadcom |
R1-92 AI: 7.6.5 |
available | [WTS] [JSN] | |||
R1-1805248 | Resource Pool Sharing between V2X Mode 3 and Mode 4 UEs |
discussion revision of R1-1802888 |
Fraunhofer HHI | Rel-15 |
R1-92 AI: 6.2.5.4 |
available | [WTS] [JSN] | ||
R1-1805249 | TP to 38.214 on UE processing time definitions | discussion | Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1805250 | Remaining issues on PDSCH rate matching in CORESET | discussion | Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.5 |
available | [WTS] [JSN] | ||
R1-1805251 | Modifications to the specification for UE procedure for receiving control information | discussion | Ericsson |
R1-92 AI: 7.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1805252 | Remaining issues on UCI multiplexing on PUSCH | discussion | CATR |
R1-92 AI: 7.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1805253 | Frame structure design in NR-U | discussion | CATR |
R1-92 AI: 7.6.2 |
available | [WTS] [JSN] | |||
R1-1805254 | Considerations on LBT in NR-based access to unlicensed spectrum | discussion | CATR |
R1-92 AI: 7.6.4 |
available | [WTS] [JSN] | |||
R1-1805255 | Consideration on a basic receiver for NOMA schemes | discussion | CATR |
R1-92 AI: 7.4.3 |
available | [WTS] [JSN] | |||
R1-1805256 | Preliminary link level simulation results of non-orthogonal multiple-access schemes | discussion | CATR |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1805257 | V2X NR Evaluation Methodology-Suggestion for New Performance Metrics | discussion | OnStar |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1805258 | V2X NR Evaluation Methodology-Suggestion for New Test Environments and Scenarios | discussion | OnStar |
R1-92 AI: 7.5.1 |
available | [WTS] [JSN] | |||
R1-1805259 | V2X NR Evaluation Methodology - Suggestion for the incorporation of realistic vehicle antenna patterns | discussion | OnStar |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |||
R1-1805260 | Corrections related to interaction between different TTI lengths | discussion | LG Electronics, Ericsson | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1.2.1 |
available | [WTS] [JSN] | |
R1-1805261 | Remaining details on TRS design |
discussion revision of R1-1804232 |
Spreadtrum Communications | Rel-15 |
R1-92 AI: 7.1.2.3.6 |
available | [WTS] [JSN] | ||
R1-1805262 | Issues related to Long PUCCH |
discussion revision of R1-1803795 |
ZTE, Sanechips |
R1-92 AI: 7.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1805263 | Search space design and related issues |
discussion revision of R1-1803791 |
ZTE, Sanechips |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1805264 | LS on RAN2 agreements on RRM |
LS in source LS: R2-1804103 LS To: RAN1, RAN4 |
RAN2, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1805265 | Introduction of enhancements to operation in unlicensed spectrum |
draftCR revised to R1-1805340 |
Ericsson | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] | |
R1-1805266 | Discussion on remaining issues for time domain resource allocation |
discussion revision of R1-1804101 |
CMCC |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1805267 | Remaining issues on CSI measurement |
discussion revision of R1-1804972 |
Ericsson |
R1-92 AI: 7.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1805268 | On further study of compact DCI for URLLC |
discussion revision of R1-1804616 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.2.2 |
noted | [WTS] [JSN] | |||
R1-1805269 | Aspects related to DL data channel |
discussion revision of R1-1804904 |
Qualcomm Incorporated |
R1-92 AI: 6.2.1.2.4 |
noted | [WTS] [JSN] | |||
R1-1805270 | Aspects related to UL data channel |
discussion revision of R1-1804905 |
Qualcomm Incorporated |
R1-92 AI: 6.2.1.2.5 |
noted | [WTS] [JSN] | |||
R1-1805271 | Downlink Enhancements for URLLC |
discussion revision of R1-1804933 |
Qualcomm Incorporated |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | |||
R1-1805272 | Summary on Flexible PDSCH/PUSCH starting PRB | discussion | Samsung | LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 6.2.6.6 |
noted | [WTS] [JSN] | |
R1-1805273 | Correction on TBS determination for msg 3 retransmission and CSS for fallback |
draftCR revised to R1-1805361 |
Samsung | LTE_feMTC-Core | Rel-14 |
R1-92 AI: 6.1.5 |
revised | [WTS] [JSN] | |
R1-1805274 | Evaluation Methodology for NR IAB |
discussion revision of R1-1804407 |
Samsung |
R1-92 AI: 7.7.2 |
noted | [WTS] [JSN] | |||
R1-1805275 | Work plan for Integrated Access and Backhaul Study Item |
Work Plan revision of R1-1804473 |
Samsung, Qualcomm, AT&T, KDDI |
R1-92 AI: 7.7 |
noted | [WTS] [JSN] | |||
R1-1805276 | On Evaluation of the Mobility Parameter for IMT-202 |
discussion revision of R1-1805144 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.8.1 |
available | [WTS] [JSN] | |||
R1-1805277 | Summary on CA Aspects | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.2 |
noted | [WTS] [JSN] | |
R1-1805278 | SRS antenna switching for 1T4R and 2T4R |
discussion revision of R1-1804937 |
Qualcomm Incorporated |
R1-92 AI: 6.2.11 |
noted | [WTS] [JSN] | |||
R1-1805279 | Collision with NPRACH in non-anchor carriers |
draftCR revision of R1-1804895 revised to R1-1805367 |
Qualcomm | NB_IOTenh2-Core | Rel-14 |
R1-92 AI: 6.1.6 |
revised | [WTS] [JSN] | |
R1-1805280 | Correction on DMRS scrambling ID for semi-open loop transmission |
CR revision of R1-1803955 |
Huawei, HiSilicon | 36.211 14.6.0 CR#4291 catF | LTE_eFDMIMO-Core | Rel-14 |
R1-92 AI: 6.1.4 |
agreed | [WTS] [JSN] |
R1-1805281 | Correction on DMRS scrambling ID for semi-open loop transmission |
CR revision of R1-1803956 |
Huawei, HiSilicon | 36.211 15.1.0 CR#4301 catA | LTE_eFDMIMO-Core | Rel-15 |
R1-92 AI: 6.1.4 |
agreed | [WTS] [JSN] |
R1-1805282 | Introduction of SRS antenna switching for 4 ports in TS36.213 |
draftCR revision of R1-1803959 revised to R1-1805323 |
Huawei, HiSilicon | LTE_EBF_FDMIMO | Rel-15 |
R1-92 AI: 6.2.11 |
revised | [WTS] [JSN] | |
R1-1805283 | Summary on Maximum time reduction between packet arrival at layer 1 and resource selection for transmission |
discussion revised to R1-1805395 |
CATT |
R1-92 AI: 6.2.5.5 |
revised | [WTS] [JSN] | |||
R1-1805284 | On NPRS for OTDOA |
other revision of R1-1804147 |
Huawei, HiSilicon | NB_IOTenh2-Core |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | ||
R1-1805285 | NPRACH false alarm reduction for NB-IoT |
discussion revision of R1-1804162 |
Ericsson |
R1-92 AI: 6.2.7.5.1 |
withdrawn | [WTS] [JSN] | |||
R1-1805286 | On more flexible PDSCH/PUSCH resource allocation |
other revision of R1-1804874 |
Sharp |
R1-92 AI: 6.2.6.6 |
available | [WTS] [JSN] | |||
R1-1805287 | Feature lead summary for EDT in eMTC | discussion | Huawei, HiSilicon |
R1-92 AI: 6.2.6.2 |
noted | [WTS] [JSN] | |||
R1-1805288 | Feature lead summary for WUS functions in NB-IoT | other | Huawei, HiSilicon |
R1-92 AI: 6.2.7.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1805289 | Feature lead summary for WUS configurations and procedures in NB-IoT | other | Huawei, HiSilicon |
R1-92 AI: 6.2.7.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1805290 | Feature lead summary for detailed design of WUS in NB-IoT | other | Huawei, HiSilicon |
R1-92 AI: 6.2.7.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1805291 | Feature lead summary for EDT in NB-IoT | other | Huawei, HiSilicon |
R1-92 AI: 6.2.7.1.2 |
noted | [WTS] [JSN] | |||
R1-1805292 | Feature lead summary for physical layer scheduling request | other | Huawei, HiSilicon |
R1-92 AI: 6.2.7.1.3 |
noted | [WTS] [JSN] | |||
R1-1805293 | Feature lead summary for SPS | other | Huawei, HiSilicon |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | |||
R1-1805294 | Discussion on the configuration of UL 256QAM |
other revision of R1-1804440 |
Huawei, HiSilicon |
R1-92 AI: 6.1.7 |
noted | [WTS] [JSN] | |||
R1-1805295 | On the configuration of UL 256QAM |
draftCR revision of R1-1804441 revised to R1-1805338 |
Huawei, HiSilicon | LTE_UL_CAP_enh-Core | Rel-14 |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |
R1-1805296 | On the configuration of UL 256QAM |
draftCR revision of R1-1804442 revised to R1-1805339 |
Huawei, HiSilicon | LTE_UL_CAP_enh-Core | Rel-15 |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |
R1-1805297 | NPRACH Reliability Enhancement |
discussion revision of R1-1804928 |
Qualcomm Incorporated |
R1-92 AI: 6.2.7.5.1 |
available | [WTS] [JSN] | |||
R1-1805298 | Ordering of P-CSI plus SR in eCA |
CR revision of R1-1804891 |
Qualcomm Incorporated | 36.212 13.7.1 CR#281 catF | LTE_CA_enh_b5C-Core | Rel-13 |
R1-92 AI: 6.1.1 |
agreed | [WTS] [JSN] |
R1-1805299 | Ordering of P-CSI plus SR in eCA | CR | Qualcomm Incorporated | 36.212 14.5.1 CR#282 catA | LTE_CA_enh_b5C-Core | Rel-14 |
R1-92 AI: 6.1.1 |
agreed | [WTS] [JSN] |
R1-1805300 | Ordering of P-CSI plus SR in eCA | CR | Qualcomm Incorporated | 36.212 15.1.0 CR#283 catA | LTE_CA_enh_b5C-Core | Rel-15 |
R1-92 AI: 6.1.1 |
agreed | [WTS] [JSN] |
R1-1805301 | Correction on number of subframes for semistatic codebook determination and transmission over PUSCH |
CR revision of R1-1804964 |
Qualcomm Incorporated | 36.213 13.9.0 CR#1058 catF | LTE_CA_enh_b5C-Core | Rel-13 |
R1-92 AI: 6.1.1 |
agreed | [WTS] [JSN] |
R1-1805302 | Correction on number of subframes for semistatic codebook determination and transmission over PUSCH | CR | Qualcomm Incorporated | 36.213 14.6.0 CR#1059 catA | LTE_CA_enh_b5C-Core | Rel-14 |
R1-92 AI: 6.1.1 |
agreed | [WTS] [JSN] |
R1-1805303 | Correction on number of subframes for semistatic codebook determination and transmission over PUSCH | CR | Qualcomm Incorporated | 36.213 15.1.0 CR#1060 catA | LTE_CA_enh_b5C-Core | Rel-15 |
R1-92 AI: 6.1.1 |
agreed | [WTS] [JSN] |
R1-1805304 | LS on Capabilities for advanced CSI in FD-MIMO |
LS out LS To: RAN2 revision of R1-1804892 revised to R1-1805402 |
Qualcomm Incorporated | LTE_eFDMIMO-Core | Rel-14 |
R1-92 AI: 6.1.4 |
revised | [WTS] [JSN] | |
R1-1805305 | efeMTC Key Issue Summary for PUSCH Sub-PRB Allocation | discussion | Sierra Wireless |
R1-92 AI: 6.2.6.5 |
noted | [WTS] [JSN] | |||
R1-1805306 | Feature summary of Reduced system acquisition time for MTC | other | Ericsson |
R1-92 AI: 6.2.6.1 |
noted | [WTS] [JSN] | |||
R1-1805307 | Draft LS on Capabilities for SRS carrier switching |
LS out LS To: RAN2 revised to R1-1805376 |
Qualcomm Incorporated | LTE_SRS_switch-Core | Rel-14 |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |
R1-1805308 | Summary of 6.2.6.3 Downlink channel power efficiency | other | Qualcomm |
R1-92 AI: 6.2.6.3 |
available | [WTS] [JSN] | |||
R1-1805309 | Summary of 6.2.7.2 Reduced system acquisition time | other | Qualcomm |
R1-92 AI: 6.2.7.2 |
available | [WTS] [JSN] | |||
R1-1805310 | Correction to UE sounding procedures (36.213) |
discussion revision of R1-1805161 |
Ericsson |
R1-92 AI: 6.2.1.2.3 |
noted | [WTS] [JSN] | |||
R1-1805311 | Summary of Uplink HARQ-ACK feedback for MTC | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.6.4 |
noted | [WTS] [JSN] | |||
R1-1805312 | Summary of DL aspects for TDD NB-IoT | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.7.6.1 |
noted | [WTS] [JSN] | |||
R1-1805313 | Summary of UL aspects for TDD NB-IoT |
other revised to R1-1805400 |
ZTE, Sanechips |
R1-92 AI: 6.2.7.6.2 |
revised | [WTS] [JSN] | |||
R1-1805314 | Introduction of enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE |
CR revision of R1-1805172 |
Ericsson | 36.211 15.1.0 CR#431 catB | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
agreed | [WTS] [JSN] |
R1-1805315 | Introduction of high capacity stationary wireless link and 1024QAM into 36.212 |
CR revision of R1-1803961 revised to R1-1807915 |
Huawei | 36.212 15.1.0 CR#284 catB | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
agreed | [WTS] [JSN] |
R1-1805316 | Introduction of Downlink 1024QAM into 36.201 |
CR revision of R1-1804496 |
Nokia, Nokia Shanghai Bell | 36.201 15.0.0 CR#251 catB | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
agreed | [WTS] [JSN] |
R1-1805317 | On UL TPC initialization after UL shorter TTI configuration |
other revised to R1-1805417 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.1.2.5 |
revised | [WTS] [JSN] | |||
R1-1805318 | Correction on layer-to-port mapping for feCoMP |
CR revision of R1-1803721 |
Huawei, HiSilicon | 36.211 15.1.0 CR#432 catF | feCOMP_LTE-Core | Rel-15 |
R1-92 AI: 6.2.4.1 |
withdrawn | [WTS] [JSN] |
R1-1805319 | Correction on the index of codewords for feCoMP | CR | Huawei, HiSilicon | 36.213 15.1.0 CR#1061 catF | feCOMP_LTE-Core | Rel-15 |
R1-92 AI: 6.2.4.1 |
withdrawn | [WTS] [JSN] |
R1-1805320 | WF on WUS sequence design | other | Qualcomm, Samsung, LGE, ZTE, SaneChips, Ericsson, MediaTek |
R1-92 AI: 6.2.7.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1805321 | Reply LS on CP latency reduction |
LS out LS To: RAN2 revision of R1-1805212 revised to R1-1805347 |
Ericsson | TEI15 | Rel-15 |
R1-92 AI: 6.2.11 |
revised | [WTS] [JSN] | |
R1-1805322 | Blind/HARQ-less Repetition for Scheduled DL-SCH Operation |
other revision of R1-1803711 |
Huawei, HiSilicon |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | |||
R1-1805323 | Introduction of SRS antenna switching for 4 ports in TS36.213 |
draftCR revision of R1-1805282 |
Huawei, HiSilicon, Qualcomm | LTE_EBF_FDMIMO | Rel-15 |
R1-92 AI: 6.2.11 |
noted | [WTS] [JSN] | |
R1-1805324 | WF on SPS for NB-IoT in Rel-15 | other | NTT DOCOMO |
R1-92 AI: 6.2.7.1.4 |
available | [WTS] [JSN] | |||
R1-1805325 | Introduction of reduced control plane latency |
draftCR revision of R1-1805210 revised to R1-1805396 |
Ericsson | TEI15 | Rel-15 |
R1-92 AI: 6.2.11 |
revised | [WTS] [JSN] | |
R1-1805326 | Summary of offline discussion for resource pool sharing between Mode-3 UE and Mode-4 UE | other | NTT DOCOMO |
R1-92 AI: 6.2.5.4 |
noted | [WTS] [JSN] | |||
R1-1805327 | Clarification on CRC attachment for DL-SCH and PCH transport channels in NB-IoT | CR | Huawei, HiSilicon | 36.212 15.1.0 CR#285 catF | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 6.1.1 |
agreed | [WTS] [JSN] |
R1-1805328 | Summary of offline discussion on support of 64-QAM for LTE V2V communication | other | Intel Corporation |
R1-92 AI: 6.2.5.2 |
noted | [WTS] [JSN] | |||
R1-1805329 | Correction on TPC field in DCI format 6-1A |
CR revision of R1-1804150 |
Huawei, HiSilicon | 36.212 14.5.1 CR#289 catF | LTE_feMTC-Core | Rel-14 |
R1-92 AI: 6.1.5 |
agreed | [WTS] [JSN] |
R1-1805330 | Correction on TPC field in DCI format 6-1A | CR | Huawei, HiSilicon | 36.212 15.1.0 CR#286 catA | LTE_feMTC-Core | Rel-15 |
R1-92 AI: 6.1.5 |
agreed | [WTS] [JSN] |
R1-1805331 | Correction on PUSCH hopping parameter for eVoLTE |
draftCR revision of R1-1804196 revised to R1-1805332 |
ZTE, CMCC | LTE_VoLTE_ViLTE_enh-Core | Rel-14 |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |
R1-1805332 | Correction on PUSCH hopping parameter for eVoLTE |
CR revision of R1-1805331 |
ZTE, CMCC | 36.211 14.6.0 CR#433 catF | LTE_VoLTE_ViLTE_enh-Core | Rel-14 |
R1-92 AI: 6.1.7 |
agreed | [WTS] [JSN] |
R1-1805333 | Correction on PUSCH hopping parameter for eVoLTE | CR | ZTE, CMCC | 36.211 15.1.0 CR#434 catA | LTE_VoLTE_ViLTE_enh-Core | Rel-15 |
R1-92 AI: 6.1.7 |
agreed | [WTS] [JSN] |
R1-1805334 | [DRAFT] LS on small-delay CDD for V2X Phase 2 |
LS out LS To: RAN4 revised to R1-1805619 |
Huawei, HiSilicon | LTE_eV2X-Perf | Rel-15 |
R1-92 AI: 6.2.5.3 |
revised | [WTS] [JSN] | |
R1-1805335 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.201 |
CR revision of R1-1804409 |
Nokia, Nokia Shanghai Bell | 36.201 15.0.0 CR#241 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
agreed | [WTS] [JSN] |
R1-1805336 | Additions to TS 36.213 (Rel-14) to capture agreements for Rel-15 FeLAA | other | Ericsson |
R1-92 AI: 6.2.2 |
available | [WTS] [JSN] | |||
R1-1805337 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s06-s09 |
draftCR revision of R1-1804485 |
Motorola Mobility Germany GmbH | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
endorsed | [WTS] [JSN] | |
R1-1805338 | On the configuration of UL 256QAM |
draftCR revision of R1-1805295 revised to R1-1805371 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | LTE_UL_CAP_enh-Core | Rel-14 |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |
R1-1805339 | On the configuration of UL 256QAM |
draftCR revision of R1-1805296 revised to R1-1805372 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | LTE_UL_CAP_enh-Core | Rel-15 |
R1-92 AI: 6.1.7 |
revised | [WTS] [JSN] | |
R1-1805340 | Introduction of enhancements to operation in unlicensed spectrum |
CR revision of R1-1805265 |
Ericsson | 36.211 15.1.0 CR#435 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
withdrawn | [WTS] [JSN] |
R1-1805341 | Summary of section 6.2.6.7 on CQI for 64QAM for efeMTC | discussion | Sony |
R1-92 AI: 6.2.6.7 |
noted | [WTS] [JSN] | |||
R1-1805342 | Summary of simulation results regarding HARQ-less repetition for scheduled DL-SCH | discussion | Huawei, HiSilicon |
R1-92 AI: 6.2.8.1 |
noted | [WTS] [JSN] | |||
R1-1805343 | Detailed design of wake-up signal for NB-IoT |
discussion revision of R1-1804154 |
Ericsson |
R1-92 AI: 6.2.7.1.1.3 |
available | [WTS] [JSN] | |||
R1-1805344 | Feature lead summary NPRACH reliability and range enhancements | discussion | Ericsson |
R1-92 AI: 6.2.7.5 |
noted | [WTS] [JSN] | |||
R1-1805345 | Feature lead summary NB-IoT small cell support improvement | other | Ericsson |
R1-92 AI: 6.2.7.4 |
available | [WTS] [JSN] | |||
R1-1805346 | Feature lead summary Narrowband measurement accuracy improvements | discussion | Ericsson |
R1-92 AI: 6.2.7.3 |
noted | [WTS] [JSN] | |||
R1-1805347 | Reply LS on CP latency reduction |
LS out LS To: RAN2 revision of R1-1805321 |
Ericsson | TEI15 | Rel-15 |
R1-92 AI: 6.2.11 |
approved | [WTS] [JSN] | |
R1-1805348 | WF on SIB1-NB transmission on a non-anchor carrier in TDD | discussion | LG Electronics, Ericsson, Lenovo, Motorola mobility |
R1-92 AI: 6.2.7.6.1 |
noted | [WTS] [JSN] | |||
R1-1805349 | Summary of TDD Common aspects | discussion | LG Electronics |
R1-92 AI: 6.2.7.6.3 |
noted | [WTS] [JSN] | |||
R1-1805350 | WF on NPUSCH transmission in UL/DL configuration #3 | other | LG Electronics |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | |||
R1-1805351 | 3GPP TS 37.213 Physical layer procedures for shared spectrum channel |
draft TS revision of R1-1804453 revised to R1-1805352 |
Ericsson | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] | |
R1-1805352 | 3GPP TS 37.213 Physical layer procedures for shared spectrum channel |
draft TS revision of R1-1805351 revised to R1-1805416 |
Ericsson | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] | |
R1-1805353 | Fallback DCI for eMTC |
draftCR revised to R1-1805359 |
Qualcomm Incorporated | LTE_feMTC-Core | Rel-14 |
R1-92 AI: 6.1.5 |
revised | [WTS] [JSN] | |
R1-1805354 | Text proposal on 1ms HARQ bits inclusion in UL sTTI in case of SPS and HARQ process sharing |
discussion revision of R1-1805147 |
Ericsson |
R1-92 AI: 6.2.1.2.1 |
endorsed | [WTS] [JSN] | |||
R1-1805355 | WF on DL Categories | other | Intel, Qualcomm |
R1-92 AI: 6.2.3.2 |
noted | [WTS] [JSN] | |||
R1-1805356 | WF on UL Power Control Enhancements for Aerials | discussion | Ericsson, ZTE, Sanechips, Nokia, NSB, Sony, CMCC |
R1-92 AI: 6.2.9.1 |
noted | [WTS] [JSN] | |||
R1-1805357 | Introduction of Enhancing CA Utilization into 36.213 |
draftCR revision of R1-1804454 revised to R1-1805377 |
Nokia, Nokia Shanghai Bell | LTE_euCA-Core | Rel-15 |
R1-92 AI: 6.2. |
revised | [WTS] [JSN] | |
R1-1805358 | Clarification of NPUSCH uplink compensation gaps for 2 HARQ processes |
draftCR revised to R1-1805398 |
Huawei, HiSilicon | NB_IOTenh-Core | Rel-14 |
R1-92 AI: 6.1.6 |
revised | [WTS] [JSN] | |
R1-1805359 | Fallback DCI for eMTC |
CR revision of R1-1805353 |
Qualcomm Incorporated | 36.212 14.5.1 CR#287 catF | LTE_feMTC-Core | Rel-14 |
R1-92 AI: 6.1.5 |
agreed | [WTS] [JSN] |
R1-1805360 | Fallback DCI for eMTC | CR | Qualcomm Incorporated | 36.212 15.1.0 CR#288 catA | LTE_feMTC-Core | Rel-15 |
R1-92 AI: 6.1.5 |
agreed | [WTS] [JSN] |
R1-1805361 | Correction on TBS determination for msg 3 retransmission and CSS for fallback |
CR revision of R1-1805273 |
Samsung | 36.213 14.6.0 CR#1062 catF | LTE_feMTC-Core | Rel-14 |
R1-92 AI: 6.1.5 |
agreed | [WTS] [JSN] |
R1-1805362 | Correction on TBS determination for msg 3 retransmission and CSS for fallback | CR | Samsung | 36.213 15.1.0 CR#1063 catA | LTE_feMTC-Core | Rel-15 |
R1-92 AI: 6.1.5 |
agreed | [WTS] [JSN] |
R1-1805363 | Text proposal on TBS determination for uplink DMRS position pattern DDD | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.5 |
noted | [WTS] [JSN] | |||
R1-1805364 | Correction on Msg3 power control for NB-IoT |
CR revision of R1-1804151 |
Huawei, HiSilicon | 36.213 14.6.0 CR#1064 catF | NB_IOTenh-Core | Rel-14 |
R1-92 AI: 6.1.6 |
agreed | [WTS] [JSN] |
R1-1805365 | Correction on Msg3 power control for NB-IoT | CR | Huawei, HiSilicon | 36.213 15.1.0 CR#1065 catA | NB_IOTenh-Core | Rel-15 |
R1-92 AI: 6.1.6 |
agreed | [WTS] [JSN] |
R1-1805366 | Text proposal on TBS determination for downlink pattern DDD | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.7 |
available | [WTS] [JSN] | |||
R1-1805367 | Collision with NPRACH in non-anchor carriers |
CR revision of R1-1805279 |
Qualcomm Incorporated | 36.211 14.6.0 CR#436 catF | NB_IOTenh-Core | Rel-14 |
R1-92 AI: 6.1.6 |
agreed | [WTS] [JSN] |
R1-1805368 | Collision with NPRACH in non-anchor carriers | CR | Qualcomm Incorporated | 36.211 15.1.0 CR#437 catA | NB_IOTenh-Core | Rel-15 |
R1-92 AI: 6.1.6 |
agreed | [WTS] [JSN] |
R1-1805369 | On NRS presence in non-anchor carriers |
CR revision of R1-1804898 |
Qualcomm Incorporated | 36.211 14.6.0 CR#438 catF | NB_IOTenh-Core | Rel-14 |
R1-92 AI: 6.1.6 |
agreed | [WTS] [JSN] |
R1-1805370 | On NRS presence in non-anchor carriers | CR | Qualcomm Incorporated | 36.211 15.1.0 CR#439 catA | NB_IOTenh-Core | Rel-15 |
R1-92 AI: 6.1.6 |
agreed | [WTS] [JSN] |
R1-1805371 | On the configuration of UL 256QAM |
CR revision of R1-1805338 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | 36.213 14.6.0 CR#1066 catF | LTE_UL_CAP_enh-Core | Rel-14 |
R1-92 AI: 6.1.7 |
agreed | [WTS] [JSN] |
R1-1805372 | On the configuration of UL 256QAM |
CR revision of R1-1805339 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | 36.213 15.1.0 CR#1067 catA | LTE_UL_CAP_enh-Core | Rel-15 |
R1-92 AI: 6.1.7 |
agreed | [WTS] [JSN] |
R1-1805373 | Correction on look-ahead for SRS carrier switching | CR | Qualcomm Inc | 36.213 14.6.0 CR#1068 catF | LTE_SRS_switch-Core | Rel-14 |
R1-92 AI: 6.1.7 |
agreed | [WTS] [JSN] |
R1-1805374 | Correction on look-ahead for SRS carrier switching | CR | Qualcomm Inc | 36.213 15.1.0 CR#1069 catA | LTE_SRS_switch-Core | Rel-15 |
R1-92 AI: 6.1.7 |
agreed | [WTS] [JSN] |
R1-1805375 | Correcting wrong entry in K_PUSCH Table for FS2 slot-PUSCH in 36.213 |
other revision of R1-1805127 |
Nokia, Nokia Shanghai Bell, Ericsson |
R1-92 AI: 6.2.1.2.6 |
available | [WTS] [JSN] | |||
R1-1805376 | LS on Capabilities for SRS carrier switching |
LS out LS To: RAN2 revision of R1-1805307 |
Qualcomm Incorporated | LTE_SRS_switch-Core | Rel-14 |
R1-92 AI: 6.1.7 |
approved | [WTS] [JSN] | |
R1-1805377 | Introduction of Enhancing CA Utilization into 36.213 |
CR revision of R1-1805357 |
Nokia, Nokia Shanghai Bell | 36.213 15.1.0 CR#1070 catB | LTE_euCA-Core | Rel-15 |
R1-92 AI: 6.2. |
agreed | [WTS] [JSN] |
R1-1805378 | WF on altitude threshold for Aerials | other | Sony, Ericsson, ZTE |
R1-92 AI: 6.2.9.1 |
noted | [WTS] [JSN] | |||
R1-1805379 | LS on altitude threshold for Aerials |
LS out LS To: RAN2 |
Sony | LTE_Aerial-Core | Rel-15 |
R1-92 AI: 6.2.9.1 |
available | [WTS] [JSN] | |
R1-1805380 | Reply LS on PC5 transmission mechanism selection |
LS in source LS: S2-183968 LS To: RAN1 |
SA2, LG Electronics | LTE_eV2X-Core | Rel-15 |
R1-92 AI: 6.2.5 |
noted | [WTS] [JSN] | |
R1-1805381 | LS on Aerials |
LS out LS To: RAN2 revised to R1-1805383 |
Ericsson | LTE_Aerial-Core | Rel-15 |
R1-92 AI: 6.2.9.1 |
revised | [WTS] [JSN] | |
R1-1805382 | Summary of offline discussion on PC5 CA synchronization | other | Ericsson |
R1-92 AI: 6.2.5.1.2 |
noted | [WTS] [JSN] | |||
R1-1805383 | Draft LS on RAN1 Agreements from RAN1#92bis and on the introduction of multiple altitude thresholds |
LS out LS To: RAN2 revision of R1-1805381 revised to R1-1805388 |
Ericsson | LTE_Aerial-Core | Rel-15 |
R1-92 AI: 6.2.9.1 |
revised | [WTS] [JSN] | |
R1-1805384 | Remaining issues of 6.2.6.3 Downlink channel power efficiency | other | Qualcomm |
R1-92 AI: 6.2.6.3 |
noted | [WTS] [JSN] | |||
R1-1805385 | WF for Reduced system acquisition time for MTC | other | Ericsson, Nokia, NSB, Sony, Intel, Sierra Wireless |
R1-92 AI: 6.2.6.1 |
noted | [WTS] [JSN] | |||
R1-1805386 | PUSCH Sub-PRB DCI Possible Agreements |
discussion revised to R1-1805410 |
Sierra Wireless |
R1-92 AI: 6.2.6.5 |
revised | [WTS] [JSN] | |||
R1-1805387 | UL index based scheduling flexibility for SPT for UL DL configuration #6 and SSC10 | discussion | ZTE, Sanechips |
R1-92 AI: 6.2.1.1 |
endorsed | [WTS] [JSN] | |||
R1-1805388 | LS on RAN1 Agreements from RAN1#92bis and on the introduction of multiple altitude thresholds |
LS out LS To: RAN2 revision of R1-1805383 |
RAN1, Ericsson | LTE_Aerial-Core | Rel-15 |
R1-92 AI: 6.2.9.1 |
approved | [WTS] [JSN] | |
R1-1805389 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s00-s05 |
draftCR revision of R1-1804484 |
Motorola Mobility Germany GmbH | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
endorsed | [WTS] [JSN] | |
R1-1805390 | Resource Pool Sharing (Option 1-4) | other | OPPO |
R1-92 AI: 6.2.5.4 |
noted | [WTS] [JSN] | |||
R1-1805391 | WF on Reporting Mechanism for Resource Pool Sharing by Mode-3/Mode-4 Ues | other | ZTE, Sanechip, Fraunhofer HHI, InterDigital, ITRI |
R1-92 AI: 6.2.5.4 |
noted | [WTS] [JSN] | |||
R1-1805392 | Summary of offline discussion for resource pool sharing between Mode-3 UE and Mode-4 UE | other | NTT DOCOMO |
R1-92 AI: 6.2.5.4 |
noted | [WTS] [JSN] | |||
R1-1805393 | Summary of Mode 4 CA | other | LG Electronics |
R1-92 AI: 6.2.5.1.1 |
available | [WTS] [JSN] | |||
R1-1805394 | Corrections to sTTI and SPT implementation |
CR revision of R1-1805171 |
Ericsson | 36.211 15.1.0 CR#4282 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
merged | [WTS] [JSN] |
R1-1805395 | Revised summary on Maximum time reduction between packet arrival at layer 1 and resource selection for transmission |
discussion revision of R1-1805283 |
CATT |
R1-92 AI: 6.2.5.5 |
available | [WTS] [JSN] | |||
R1-1805396 | Introduction of reduced control plane latency |
draftCR revision of R1-1805325 revised to R1-1805408 |
Ericsson | TEI15 | Rel-15 |
R1-92 AI: 6.2.11 |
revised | [WTS] [JSN] | |
R1-1805397 | [DRAFT] LS on RRC parameters for V2X Phase 2 |
LS out LS To: RAN2 revised to R1-1805620 |
Huawei | LTE_eV2X-Core | Rel-15 |
R1-92 AI: 6.2.5 |
revised | [WTS] [JSN] | |
R1-1805398 | Clarification of NPUSCH uplink compensation gaps for 2 HARQ processes |
draftCR revision of R1-1805358 revised to R1-1805403 |
Huawei, HiSilicon | NB_IOTenh-Core | Rel-14 |
R1-92 AI: 6.1.6 |
revised | [WTS] [JSN] | |
R1-1805399 | Corrections related to DL data channel for sTTI operation |
discussion revision of R1-1804508 |
LG Electronics, Ericsson, Nokia, Nokia Shanghai Bell, Intel Corporation |
R1-92 AI: 6.2.1.2.4 |
noted | [WTS] [JSN] | |||
R1-1805400 | Summary of UL aspects for TDD NB-IoT |
other revision of R1-1805313 |
Sanechips |
R1-92 AI: 6.2.7.6.2 |
noted | [WTS] [JSN] | |||
R1-1805401 | WF on channel quality report in Msg3 for NB-IoT | other | CMCC, ZTE, Sanechip, Samsung, MediaTek |
R1-92 AI: 6.1.6 |
noted | [WTS] [JSN] | |||
R1-1805402 | LS on Capabilities for advanced CSI in FD-MIMO |
LS out LS To: RAN2 revision of R1-1805304 |
Qualcomm Incorporated | LTE_eFDMIMO-Core | Rel-14 |
R1-92 AI: 6.1.4 |
approved | [WTS] [JSN] | |
R1-1805403 | Clarification of NPUSCH uplink compensation gaps for 2 HARQ processes |
CR revision of R1-1805398 |
Huawei, HiSilicon | 36.213 14.6.0 CR#1071 catF | NB_IOTenh-Core | Rel-14 |
R1-92 AI: 6.1.6 |
agreed | [WTS] [JSN] |
R1-1805404 | Clarification of NPUSCH uplink compensation gaps for 2 HARQ processes | CR | Huawei, HiSilicon | 36.213 15.1.0 CR#1072 catA | NB_IOTenh-Core | Rel-15 |
R1-92 AI: 6.1.6 |
agreed | [WTS] [JSN] |
R1-1805405 | [DRAFT] LS on downlink channel quality report in Msg3 for NB-IoT |
LS out LS To: RAN2, RAN4 revised to R1-1805407 |
CMCC | NB_IOT-Core, TEI14 | Rel-14 |
R1-92 AI: 6.1.6 |
revised | [WTS] [JSN] | |
R1-1805406 | Corrections for supporting two TBs in case of sTTI-to-TTI dynamic switching (TP#57) | other | Qualcomm |
R1-92 AI: 6.2.1.2.1 |
endorsed | [WTS] [JSN] | |||
R1-1805407 | LS on downlink channel quality report in Msg3 for NB-IoT |
LS out LS To: RAN2, RAN4 revision of R1-1805405 |
RAN1, CMCC | NB_IOT-Core, TEI14 | Rel-14 |
R1-92 AI: 6.1.6 |
approved | [WTS] [JSN] | |
R1-1805408 | Introduction of reduced control plane latency |
CR revision of R1-1805396 |
Ericsson | 36.213 15.1.0 CR#1073 catB | TEI15 | Rel-15 |
R1-92 AI: 6.2.11 |
agreed | [WTS] [JSN] |
R1-1805409 | Updated Feature lead summary for EDT in NB-IoT | other | Huawei, HiSilicon |
R1-92 AI: 6.2.7.1.2 |
noted | [WTS] [JSN] | |||
R1-1805410 | PUSCH Sub-PRB DCI Possible Agreements |
discussion revision of R1-1805386 |
Sierra Wireless, Nokia, NSB, Huawei, HiSilicon, Qualcomm, Sony, Sharp, Samsung, Sane Chips, ZTE |
R1-92 AI: 6.2.6.5 |
noted | [WTS] [JSN] | |||
R1-1805411 | Corrections on DAI in 36.212 | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.7 |
available | [WTS] [JSN] | |||
R1-1805412 | On modulation for sTTI operation | other | Huawei, HiSilicon |
R1-92 AI: 6.2.1.2.4 |
available | [WTS] [JSN] | |||
R1-1805413 | WF on NPUSCH transmission with 3.75kHz subcarrier spacing | other | LG Electronics |
R1-92 AI: 6.2.7.6.2 |
available | [WTS] [JSN] | |||
R1-1805414 | Notes from the offline session on LTE URLLC | other | Ericsson |
R1-92 AI: 6.2.8 |
noted | [WTS] [JSN] | |||
R1-1805415 | Notes from the offline session on LTE sTTI | other | Ericsson |
R1-92 AI: 6.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1805416 | 3GPP TS 37.213 Physical layer procedures for shared spectrum channel |
draft TS revision of R1-1805352 revised to R1-1805788 |
Ericsson | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
endorsed | [WTS] [JSN] | |
R1-1805417 | On UL TPC initialization after UL shorter TTI configuration |
other revision of R1-1805317 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 6.2.1.2.5 |
available | [WTS] [JSN] | |||
R1-1805418 | Introduction of FeLAA into 36.212 |
CR revision of R1-1803960 revised to R1-1805770 |
Huawei | 36.212 15.1.0 CR#290 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
revised | [WTS] [JSN] |
R1-1805419 | Draft LS on Narrowband measurement accuracy improvements |
LS out LS To: RAN4 revised to R1-1805434 |
Ericsson | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 6.2.7.3 |
revised | [WTS] [JSN] | |
R1-1805420 | [DRAFT] LS on additional agreements for shortened TTI and processing time for LTE |
LS out LS To: RAN2 revised to R1-1805435 |
Ericsson | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
revised | [WTS] [JSN] | |
R1-1805421 | Chairman's notes of AI 6.1 Maintenance of E-UTRA Releases 8 - 14 | other | Ad-hoc chair (Ericsson) |
R1-92 AI: 6.1 |
endorsed | [WTS] [JSN] | |||
R1-1805422 | Chairman's notes of AI 6.2.1 Maintenance of Release 15 Shortened TTI and processing time for LTE | other | Ad-hoc chair (Ericsson) | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
endorsed | [WTS] [JSN] | |
R1-1805423 | Chairman's notes of AI 6.2.2 Maintenance of Release 15 Enhancements to LTE operation in unlicensed spectrum | other | Ad-hoc chair (Ericsson) | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
endorsed | [WTS] [JSN] | |
R1-1805424 | Chairman's notes of AI 6.2.3 Maintenance of Release 15 Enhancements for high capacity stationary wireless link and introduction of 1024 QAM for LTE | other | Ad-hoc chair (Ericsson) | LTE_1024QAM_DL-Core | Rel-15 |
R1-92 AI: 6.2.3 |
endorsed | [WTS] [JSN] | |
R1-1805425 | Chairman's notes of AI 6.2.4 Maintenance of Release 15 Further enhancements to Coordinated Multi-Point (CoMP) Operation for LTE | other | Ad-hoc chair (Ericsson) | feCOMP_LTE-Core | Rel-15 |
R1-92 AI: 6.2.4 |
endorsed | [WTS] [JSN] | |
R1-1805426 | Chairman's notes of AI 6.2.5 3GPP V2X Phase 2 | other | Ad-Hoc chair (Samsung) | LTE_eV2X-Core | Rel-15 |
R1-92 AI: 6.2.5 |
endorsed | [WTS] [JSN] | |
R1-1805427 | Chairman's notes of AI 6.2.6 Even further enhanced MTC for LTE | other | Ad-hoc chair (NTT DOCOMO) | LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 6.2.6 |
endorsed | [WTS] [JSN] | |
R1-1805428 | Chairman's notes of AI 6.2.7 Further enhancements of NB-IoT | other | Ad-hoc chair (NTT DOCOMO) | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 6.2.7 |
endorsed | [WTS] [JSN] | |
R1-1805429 | Chairman's notes of AI 6.2.8 Ultra Reliable Low Latency Communication for LTE | other | Ad-Hoc chair (Ericsson) | LTE_HRLLC-Core | Rel-15 |
R1-92 AI: 6.2.8 |
endorsed | [WTS] [JSN] | |
R1-1805430 | Chairman's notes of AI 6.2.9 Enhanced LTE Support for Aerial Vehicles | other | Ad-Hoc chair (Ericsson) | LTE_Aerial-Core | Rel-15 |
R1-92 AI: 6.2.9 |
endorsed | [WTS] [JSN] | |
R1-1805431 | Chairman's notes of AI 6.2.10 Enhancing CA Utilization | other | Ad-Hoc chair (Ericsson) | LTE_euCA-Core | Rel-15 |
R1-92 AI: 6.2. |
endorsed | [WTS] [JSN] | |
R1-1805432 | Chairman's notes of AI 6.2.11 Others | other | Ad-Hoc chair (Ericsson) | Rel-15 |
R1-92 AI: 6.2.11 |
endorsed | [WTS] [JSN] | ||
R1-1805433 | Draft LS on agreements for ultra reliable low latency communication for LTE |
LS out LS To: RAN2 |
Ericsson | LTE_HRLLC-Core | Rel-15 |
R1-92 AI: 6.2.8 |
noted | [WTS] [JSN] | |
R1-1805434 | LS on Narrowband measurement accuracy improvements |
LS out LS To: RAN4 revision of R1-1805419 |
RAN1, Ericsson | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 6.2.7.3 |
approved | [WTS] [JSN] | |
R1-1805435 | LS on additional agreements for shortened TTI and processing time for LTE |
LS out LS To: RAN2 revision of R1-1805420 |
RAN1, Ericsson | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
approved | [WTS] [JSN] | |
R1-1805436 | RAN1 agreements for Rel-15 Further NB-IoT enhancements |
other revised to R1-1805437 |
Ericsson |
R1-92 AI: 6.2.7 |
revised | [WTS] [JSN] | |||
R1-1805437 | RAN1 agreements for Rel-15 Further NB-IoT enhancements |
other revision of R1-1805436 |
Ericsson |
R1-92 AI: 6.2.7 |
available | [WTS] [JSN] | |||
R1-1805438 | Reply LS on handling of multiple numerologies in FeMBMS |
LS out LS is reply to R2-1806298 LS To: RAN2 |
RAN1, Qualcomm | MBMS_LTE_enh2-Core | Rel-14 |
R1-92 AI: 6.1.7 |
approved | [WTS] [JSN] | |
R1-1805439 | [92b-NR-03] Necessary information for search space configuration | discussion | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1 |
available | [WTS] [JSN] | |
R1-1805440 | LS on PDCCH common search space configurations |
LS out LS To: RAN2 |
RAN1, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1 |
approved | [WTS] [JSN] | |
R1-1805441 | Introduction of SRS antenna switching for 4 ports in TS36.213 | CR | Qualcomm, Huawei, HiSilicon | 36.213 15.1.0 CR#1075 catB | TEI15 | Rel-15 |
R1-92 AI: 6.2.11 |
agreed | [WTS] [JSN] |
R1-1805442 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805443 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805444 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805445 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805446 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805447 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805448 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805449 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805450 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805451 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805452 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805453 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805454 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805455 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805456 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805457 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805458 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805459 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805460 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805461 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805462 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805463 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805464 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805465 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805466 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805467 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805468 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805469 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805470 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805471 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805472 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805473 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805474 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805475 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805476 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805477 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805478 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805479 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805480 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805481 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805482 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805483 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805484 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805485 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805486 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805487 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805488 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805489 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805490 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805491 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805492 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805493 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805494 | void | discussion | ETSI |
R1-92 AI: 6 |
withdrawn | [WTS] [JSN] | |||
R1-1805495 | Corrections for shortened processing time and shortened TTI in 36.213, s00-s05 |
CR revised to R1-1807926 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#10491 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
agreed | [WTS] [JSN] |
R1-1805496 | Corrections for shortened processing time and shortened TTI in 36.213, s06-s07 |
CR revised to R1-1807927 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#10501 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
agreed | [WTS] [JSN] |
R1-1805497 | Corrections for shortened processing time and shortened TTI in 36.213, s10-s13 |
CR revised to R1-1807928 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#10511 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
agreed | [WTS] [JSN] |
R1-1805498 | Corrections for shortened processing time and shortened TTI in 36.213, s14-xx | CR | Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#10521 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
agreed | [WTS] [JSN] |
R1-1805499 | Corrections for shortened processing time and shortened TTI in 36.213, s08-s09 |
CR revised to R1-1807929 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#1074 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
agreed | [WTS] [JSN] |
R1-1805500 | Summary of RAN1#92bis Tdocs on PUCCH resource allocation | discussion | OPPO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |
R1-1805501 | Summary of 7.1.1.1 Synchronization signal |
discussion revised to R1-1805595 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.1 |
revised | [WTS] [JSN] | |
R1-1805502 | Summary of 7.1.1.2.1 NR-PBCH |
discussion revised to R1-1805596 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.1 |
revised | [WTS] [JSN] | |
R1-1805503 | IMT 2020 Evaluations: On eMBB spectral efficiency with NR |
discussion revision of R1-1805228 revised to R1-1806433 |
Ericsson |
R1-92 AI: 7.8.2 |
available | [WTS] [JSN] | |||
R1-1805504 | Summary of 7.1.3.1.4 (DCI contents and formats) |
discussion revised to R1-1805572 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.4 |
revised | [WTS] [JSN] | |
R1-1805505 | Summary of 7.1.3.3.1 (resource allocation) | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |
R1-1805506 | On DL/UL resource allocation |
discussion revision of R1-1805188 |
Ericsson |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1805507 | On UL data transmission procedure |
discussion revision of R1-1805191 |
Ericsson |
R1-92 AI: 7.1.3.3.4 |
available | [WTS] [JSN] | |||
R1-1805508 | Summary on Paging design |
discussion revised to R1-1805679 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.3 |
revised | [WTS] [JSN] | |
R1-1805509 | Remaining open items on PUCCH resource allocation |
discussion revision of R1-1804461 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1805510 | Open issues on aperiodic CSI-RS for non-codebook-based transmission |
discussion revision of R1-1804356 |
Samsung |
R1-92 AI: 7.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1805511 | Considerations for CQI and MCS for URLLC |
discussion revision of R1-1804817 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.2.1 |
noted | [WTS] [JSN] | ||
R1-1805512 | Summary of Discussion for NR RRM measurements | discussion | Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.1 |
noted | [WTS] [JSN] | |
R1-1805513 | Summary of Discussion for NR Radio Link Monitoring | discussion | Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.2 |
noted | [WTS] [JSN] | |
R1-1805514 | Feature lead summary on beam measurement and reporting | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.3 |
noted | [WTS] [JSN] | |
R1-1805515 | Considerations on CQI /MCS table(s) and related aspects for URLLC |
discussion revision of R1-1803800 |
ZTE, Sanechips |
R1-92 AI: 7.2.1 |
noted | [WTS] [JSN] | |||
R1-1805516 | Summary of 7.1.1.2.3 Other system information delivery | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.3 |
noted | [WTS] [JSN] | |
R1-1805517 | Remaining details on search space |
other revision of R1-1804761 |
Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | |||
R1-1805518 | Summary of open issues related to rate-matching in NR | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.5 |
noted | [WTS] [JSN] | |
R1-1805519 | CQI and MCS Tables for URLLC |
discussion revision of R1-1804389 |
Samsung |
R1-92 AI: 7.2.1 |
available | [WTS] [JSN] | |||
R1-1805520 | LS on L2 measurement specification for NR in R15 |
LS in source LS: S5-182574 LS To: RAN2 |
SA5, Ericsson | NETSLICE-ADPM5G | Rel-15 |
R1-92 AI: 5 |
noted | [WTS] [JSN] | |
R1-1805521 | Maintenance for CSI measurement |
discussion revision of R1-1804785 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.2.2.1 |
available | [WTS] [JSN] | ||
R1-1805522 | Summary of SRS |
discussion revised to R1-1805678 |
Sony | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.5 |
noted | [WTS] [JSN] | |
R1-1805523 | LS on the transmission of video over PC5 interface |
LS in source LS: S4-180633 LS To: RAN1 |
SA4, Samsung | FS_mV2X | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1805524 | Remaining details on RACH procedure |
discussion revision of R1-1804047 |
MediaTek Inc. |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1805525 | Remaining TA related issues |
discussion revision of R1-1804048 |
MediaTek Inc. |
R1-92 AI: 7.1.1.6 |
available | [WTS] [JSN] | |||
R1-1805526 | Review Summary for Al 7.1.3.2.2 PUCCH structure in long-duration |
discussion revised to R1-1805615 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.2 |
revised | [WTS] [JSN] | |
R1-1805527 | Remaining details on RACH procedure |
discussion revision of R1-1804779 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | ||
R1-1805528 | Initial LLS results and SLS evaluation assumptions |
discussion revision of R1-1804746 |
Intel Corporation |
R1-92 AI: 7.4.4 |
available | [WTS] [JSN] | |||
R1-1805529 | Summary of Multiplexing data with different transmission durations | discussion | vivo | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.6 |
noted | [WTS] [JSN] | |
R1-1805530 | Offline discussion summary for GC-PDCCH |
discussion revised to R1-1805559 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.3 |
revised | [WTS] [JSN] | |
R1-1805531 | Summary of views on CSI reporting v1 |
discussion revised to R1-1805551 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.2 |
revised | [WTS] [JSN] | |
R1-1805532 | IAB scenarios and evaluations |
discussion revision of R1-1804172 |
ZTE, Sanechips |
R1-92 AI: 7.7.2 |
available | [WTS] [JSN] | |||
R1-1805533 | Summary of remaining details on PRACH format |
discussion revised to R1-1805577 |
Convida Wireless | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.1 |
revised | [WTS] [JSN] | |
R1-1805534 | On NR-LTE coex design |
discussion revision of R1-1804455 |
Ericsson GmbH, Eurolab |
R1-92 AI: 7.1.5 |
withdrawn | [WTS] [JSN] | |||
R1-1805535 | Summary of offline email discussion on Tx side processing and receiver types for clarification |
discussion revision of R1-1803620 |
ZTE, Sanechips |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1805536 | Summary of offline email discussion on system-level evaluation methodology and assumptions for NOMA |
discussion revision of R1-1803621 revised to R1-1805588 |
ZTE, Sanechips |
R1-92 AI: 7.4.5 |
revised | [WTS] [JSN] | |||
R1-1805537 | Offline summary AI 7.1.3.1.1 PDCCH structure | discussion | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.1 |
noted | [WTS] [JSN] | |
R1-1805538 | Offline summary AI 7.1.3.1.2 Search space | other | NTT DOCOMO | NR_newRAT-Core |
R1-92 AI: 7.1.3.1.2 |
available | [WTS] [JSN] | ||
R1-1805539 | Offline summary for AI 7.1.3.3.4 UL data transmission procedure | discussion | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.4 |
noted | [WTS] [JSN] | |
R1-1805540 | Summary of DL/UL scheduling and HARQ management |
discussion revised to R1-1805746 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.2 |
revised | [WTS] [JSN] | |
R1-1805541 | Feature lead summary 1 of PT-RS |
discussion revised to R1-1805542 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.4 |
revised | [WTS] [JSN] | |
R1-1805542 | Feature lead summary 2 of PT-RS |
discussion revision of R1-1805541 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.4 |
noted | [WTS] [JSN] | |
R1-1805543 | Summary of bandwidth part remaining issues |
discussion revised to R1-1805658 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
revised | [WTS] [JSN] | |
R1-1805544 | Feature lead summary of remaining issues for RS multiplexing | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.1 |
noted | [WTS] [JSN] | |
R1-1805545 | Summary for CQI and MCS | other | AT&T | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.5 |
noted | [WTS] [JSN] | |
R1-1805546 | On NR UE feature list |
discussion revision of R1-1804738 |
Intel Corporation |
R1-92 AI: 7.1.7 |
noted | [WTS] [JSN] | |||
R1-1805547 | On PDCCH Reliability | discussion | KT Corp. |
R1-92 AI: 7.2.3 |
available | [WTS] [JSN] | |||
R1-1805548 | Remaining issues on DMRS | discussion | KT Corp. |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1805549 | Summary of issues on UL non-codebook based transmission | other | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.1.3 |
noted | [WTS] [JSN] | |
R1-1805550 | Summary #1 for TRS | discussion | MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.6 |
noted | [WTS] [JSN] | |
R1-1805551 | Summary of views on CSI reporting v2 |
discussion revision of R1-1805531 revised to R1-1805594 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.2 |
noted | [WTS] [JSN] | |
R1-1805552 | Summary of remaining issues on CSI measurement | discussion | ZTE | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.1 |
noted | [WTS] [JSN] | |
R1-1805553 | Offline summary for Al 7.1.6.1 NR UL power control in non-CA aspects | discussion | ZTE | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.6.1 |
noted | [WTS] [JSN] | |
R1-1805554 | Summary of remaining issues for UCI multiplexing on PUSCH |
discussion revised to R1-1805599 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.3 |
revised | [WTS] [JSN] | |
R1-1805555 | Discussion on network topology for sub-7GHz coexistence evaluations between NR-U and Wi-Fi |
discussion revision of R1-1805093 |
Broadcom, Cisco, HPE |
R1-92 AI: 7.6.1 |
noted | [WTS] [JSN] | |||
R1-1805556 | TBS determination for HARQ retransmission | discussion | Intel |
R1-92 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-1805557 | Remaining issues on CSI-RS | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.2 |
noted | [WTS] [JSN] | |
R1-1805558 | [DRAFT] LS on time domain resource allocation |
LS out LS To: RAN2 revised to R1-1805765 |
Nokia | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7 |
revised | [WTS] [JSN] | |
R1-1805559 | Offline discussion summary for GC-PDCCH carrying SFI |
discussion revision of R1-1805530 revised to R1-1805656 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.3 |
revised | [WTS] [JSN] | |
R1-1805560 | Summary of Partially Overlapped PUCCH Resources | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.1 |
noted | [WTS] [JSN] | |
R1-1805561 | Summary of Remaining Issues on Short PUCCH | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.1 |
noted | [WTS] [JSN] | |
R1-1805562 | Summary of simultaneous transmission and reception of channels/signals |
discussion revised to R1-1805575 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.6 |
revised | [WTS] [JSN] | |
R1-1805563 | Summary 1 on Remaining issues on Beam Failure Recovery |
discussion revised to R1-1805583 |
MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
revised | [WTS] [JSN] | |
R1-1805564 | Summary of Codebook Based UL Transmission | discussion | Intel |
R1-92 AI: 7.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1805565 | WF on remaining issues for beam failure recovery | discussion | Intel, MediaTek, ZTE, Sanechips, Huawei, HiSilicon |
R1-92 AI: 7.1.2.2.4 |
noted | [WTS] [JSN] | |||
R1-1805566 | Summary of remaining details on RACH procedure |
discussion revised to R1-1805614 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
revised | [WTS] [JSN] | |
R1-1805567 | Three state V2X sidelink channel model |
other revision of R1-1803670 |
Huawei, HiSilicon, Spirent Communications, Panasonic, Cohere Technologies, ITRI, Intel, InterDigital, CATT, NEC, Keysight Technologies, Qualcomm, ZTE, Sanechips, LGE, Fraunhofer HHI, General Motors, Nokia, Nokia Shanghai Bell, AT&T, Sony, Vodafone |
R1-92 AI: 7.5.2 |
noted | [WTS] [JSN] | |||
R1-1805568 | Summary of offline for search space | discussion | NTT DOCOMO |
R1-92 AI: 7.1.3.1.2 |
noted | [WTS] [JSN] | |||
R1-1805569 | TP for 38.213 on SFI section 11.1 |
discussion revision of R1-1804801 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.1.3.1.5 |
available | [WTS] [JSN] | ||
R1-1805570 | Summary of remaining issues on CBG based retransmission | discussion | LG Electronics | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.3 |
noted | [WTS] [JSN] | |
R1-1805571 | Summary of NR UL Power Control - CA/DC aspects | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.6.2 |
noted | [WTS] [JSN] | |
R1-1805572 | Summary of 7.1.3.1.4 (DCI contents and formats) |
discussion revision of R1-1805504 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.4 |
available | [WTS] [JSN] | |
R1-1805573 | RACH MSG2 to MSG3 delay | discussion | Ericsson |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1805574 | Feature lead summary on 2 beam measurement and reporting | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.3 |
noted | [WTS] [JSN] | |
R1-1805575 | Summary of simultaneous transmission and reception of channels/signals |
discussion revision of R1-1805562 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.6 |
noted | [WTS] [JSN] | |
R1-1805576 | LS on NPRS design enhancement for colliding NPRS |
LS in source LS: R4-1805486 LS To: RAN1 |
RAN4, Qualcomm | NB_IOTenh-Core | Rel-14 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1805577 | Summary of remaining details on PRACH format |
discussion revision of R1-1805533 revised to R1-1805648 |
Convida Wireless | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.1 |
revised | [WTS] [JSN] | |
R1-1805578 | Summary of offline discussion on PUCCH resource allocation | discussion | OPPO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.4 |
noted | [WTS] [JSN] | |
R1-1805579 | Reply LS on handling of multiple numerologies in FeMBMS |
LS in LS is reply to R1-1803116 source LS: R2-1806298 LS To: RAN1 |
RAN2, Qualcomm | MBMS_LTE_enh2-Core | Rel-14 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1805580 | Simulation methodology for NR unlicensed operation |
discussion revision of R1-1804579 |
LG Electronics |
R1-92 AI: 7.6.1 |
available | [WTS] [JSN] | |||
R1-1805581 | Summary of offline discussion on eV2X evaluation methodology |
discussion revised to R1-1805671 |
LG Electronics | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.5 |
revised | [WTS] [JSN] | |
R1-1805582 | Summary of PRB Bundling for DL | discussion | vivo | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.1.4 |
noted | [WTS] [JSN] | |
R1-1805583 | Revised Summary 1 on Remaining issues on Beam Failure Recovery |
discussion revision of R1-1805563 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
noted | [WTS] [JSN] | |
R1-1805584 | WF on UL PTRS port indication | discussion | vivo, Intel, NEC, Lenovo, Motorola Mobility, ZTE, Sanechips, OPPO, Samsung, LG Electronics, MediaTek, Nokia, Nokia Shanghai Bell, Huawei, HiSilicon, CMCC, NTT DOCOMO |
R1-92 AI: 7.1.2.3.4 |
noted | [WTS] [JSN] | |||
R1-1805585 | WF on Simulation Scenarios for NR-U | discussion | Qualcomm, Nokia, NSN |
R1-92 AI: 7.6.1 |
noted | [WTS] [JSN] | |||
R1-1805586 | WF on Frame Structure for NR-U | discussion | Qualcomm, Ericsson |
R1-92 AI: 7.6.2 |
noted | [WTS] [JSN] | |||
R1-1805587 | WF on group/sequence hopping for DFT-S_OFDM PUSCH DMRS | discussion | CMCC, ZTE, Sanechips, Intel, Nokia, Nokia Shanghai Bell, OPPO, NEC, LG Electronics, NTT DOCOMO, MediaTek, vivo, Qualcomm |
R1-92 AI: 7.1.2.3.3 |
noted | [WTS] [JSN] | |||
R1-1805588 | Summary of offline email discussion on system-level evaluation methodology and assumptions for NOMA |
discussion revision of R1-1805536 |
ZTE, Sanechips |
R1-92 AI: 7.4.5 |
available | [WTS] [JSN] | |||
R1-1805589 | Summary of offline discussion on receiver types | discussion | ZTE, Sanechips | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R1-1805590 | Evaluation scenarios for NR V2X use cases |
discussion revision of R1-1804827 |
Qualcomm Incorporated | Rel-15 |
R1-92 AI: 7.5.1 |
noted | [WTS] [JSN] | ||
R1-1805591 | WF on PHY Channel Design for NR-U | discussion | Qualcomm, Ericsson |
R1-92 AI: 7.6.3 |
noted | [WTS] [JSN] | |||
R1-1805592 | WF on PHY Procedures for NR-U | discussion | Qualcomm, Ericsson |
R1-92 AI: 7.6.4 |
withdrawn | [WTS] [JSN] | |||
R1-1805593 | Feature lead summary on QCL |
discussion revised to R1-1805660 |
Nokia | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.7 |
revised | [WTS] [JSN] | |
R1-1805594 | Summary of views on CSI reporting v5 |
discussion revision of R1-1805551 revised to R1-1805692 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.2 |
revised | [WTS] [JSN] | |
R1-1805595 | Summary of 7.1.1.1 Synchronization signal |
discussion revision of R1-1805501 revised to R1-1805748 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.1 |
revised | [WTS] [JSN] | |
R1-1805596 | Summary of 7.1.1.2.1 NR-PBCH |
discussion revision of R1-1805502 revised to R1-1805749 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.1 |
revised | [WTS] [JSN] | |
R1-1805597 | Draft LS on Max TBS for PDSCH containing RMSI |
LS out LS To: RAN2 revised to R1-1805617 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.2 |
revised | [WTS] [JSN] | |
R1-1805598 | Offline summary on Max TBS for broadcast PDSCH | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.2 |
noted | [WTS] [JSN] | |
R1-1805599 | Summary of remaining issues for UCI multiplexing on PUSCH |
discussion revision of R1-1805554 revised to R1-1805666 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.3 |
revised | [WTS] [JSN] | |
R1-1805600 | Summary of Offline Discussion on RMSI |
discussion revision of R1-1803731 revised to R1-1805741 |
CATT |
R1-92 AI: 7.1.1.2.2 |
revised | [WTS] [JSN] | |||
R1-1805601 | Outcome of offline discussion on 7.1.3.1.4 | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.4 |
noted | [WTS] [JSN] | |
R1-1805602 | Outcome of offline discussion on 7.1.3.3.1 | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.1 |
noted | [WTS] [JSN] | |
R1-1805603 | Proposal on aperiodic CSI-RS for non-codebook-based transmission | discussion | Samsung, Huawei, HiSilicon, Nokia, NSB, CATT, NTT DOCOMO, CHTTL, Verizon Wireless, KDDI, Spreadtrum, KT, WILUS Inc., ASUSTek |
R1-92 AI: 7.1.2.1.3 |
noted | [WTS] [JSN] | |||
R1-1805604 | WF on beamFailureRecoveryTimer | discussion | InterDigital, MediaTek, Ericsson, ZTE, SaneChips, Huawei, HiSilicon, NTT DOCOMO, Intel, Samsung |
R1-92 AI: 7.1.2.2.4 |
noted | [WTS] [JSN] | |||
R1-1805605 | RMSI CORESET Configuration Tables for SS SCS = 15 kHz and min CH BW = 10 MHz | discussion | Samsung |
R1-92 AI: 7.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1805606 | Summary of offline discussion on CSI measurement | discussion | ZTE | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.1 |
noted | [WTS] [JSN] | |
R1-1805607 | Discussion on Approximate Peak Data Rate and Scaling Factor Use Cases | discussion | Intel | NR_newRAT-Core |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | ||
R1-1805608 | Summary of Offline Discussion for NR Radio Link Monitoring |
discussion revised to R1-1805697 |
Intel | NR_newRAT-Core |
R1-92 AI: 7.1.1.5.2 |
revised | [WTS] [JSN] | ||
R1-1805609 | Summary of Offline Discussion for NR RRM measurements |
discussion revised to R1-1805632 |
Intel | NR_newRAT-Core |
R1-92 AI: 7.1.1.5.1 |
revised | [WTS] [JSN] | ||
R1-1805610 | WF on DM-RS scrambling with fallback DCIs | discussion | Huawei, HiSilicon, vivo, China Telecom, NEC, CEWiT, China Unicom, AT&T, IITH, Deutsche Telekom, Tejas Networks, Softbank, Sony, Fujitsu, IITM, ASUSTeK, Lenovo, Motorola Mobility, CMCC, ZTE, Sanechips, Intel, OPPO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.3 |
noted | [WTS] [JSN] | |
R1-1805611 | First Summary of Issues for PDSCH/PUSCH’s DM-RS |
discussion revised to R1-1805635 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.3 |
noted | [WTS] [JSN] | |
R1-1805612 | Summary of offline discussion on PUCCH resource allocation |
discussion revised to R1-1805667 |
OPPO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.4 |
revised | [WTS] [JSN] | |
R1-1805613 | Offline Discussion on Support of Separate CQI and MCS table(s) for URLLC |
discussion revised to R1-1805642 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.2.1 |
revised | [WTS] [JSN] | |
R1-1805614 | Summary of remaining details on RACH procedure |
discussion revision of R1-1805566 revised to R1-1805650 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
revised | [WTS] [JSN] | |
R1-1805615 | Outcome of the offline discussion for PUCCH structure in long-duration |
discussion revision of R1-1805526 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.2 |
noted | [WTS] [JSN] | |
R1-1805616 | WF on MAC CE indication delay | discussion | Intel, Spreadtrum, MediaTek, OPPO, NEC, InterDigital, CATT, vivo |
R1-92 AI: 7.1.2.2.3 |
noted | [WTS] [JSN] | |||
R1-1805617 | Draft LS on Max TBS for PDSCH containing RMSI |
LS out LS To: RAN2 revision of R1-1805597 revised to R1-1805653 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.2 |
revised | [WTS] [JSN] | |
R1-1805618 | Default PDSCH table | discussion | Ericsson |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1805619 | LS on small-delay CDD for V2X Phase 2 |
LS out LS To: RAN4 revision of R1-1805334 |
RAN1, Huawei | LTE_eV2X-Perf | Rel-15 |
R1-92 AI: 6.2.5.3 |
approved | [WTS] [JSN] | |
R1-1805620 | LS on RRC parameters for V2X Phase 2 |
LS out LS To: RAN2 revision of R1-1805397 |
RAN1, Huawei | LTE_eV2X-Core | Rel-15 |
R1-92 AI: 6.2.5 |
approved | [WTS] [JSN] | |
R1-1805621 | LS on time domain behavior of CSI-RS and CSI-IM |
LS out LS To: RAN2 revision of R1-1805661 |
RAN1, ZTE | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.1 |
approved | [WTS] [JSN] | |
R1-1805622 | LS on beamFailureRecoveryTimer |
LS out LS To: RAN2 revision of R1-1805716 |
RAN1, InterDigital | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
approved | [WTS] [JSN] | |
R1-1805623 | LS on NR BFR |
LS out LS To: RAN2 revision of R1-1805714 |
RAN1, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
approved | [WTS] [JSN] | |
R1-1805624 | void | other | ETSI |
R1-92 AI: 7.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-1805625 | LS to RAN2 on aperiodic SRS triggering |
LS out LS To: RAN2 revision of R1-1805700 |
RAN1, Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.5 |
approved | [WTS] [JSN] | |
R1-1805626 | LS on NR CSI-RS |
LS out LS To: RAN2 revision of R1-1805740 |
RAN1, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.2 |
approved | [WTS] [JSN] | |
R1-1805627 | LS on UL cross carrier beam indication |
LS out LS To: RAN2 revision of R1-1805739 |
RAN1, Samsung | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.3 |
approved | [WTS] [JSN] | |
R1-1805628 | void | other | ETSI |
R1-92 AI: 7.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-1805629 | Summary of handling UL multiplexing of transmission with different reliability requirements | discussion | vivo |
R1-92 AI: 7.2.4 |
noted | [WTS] [JSN] | |||
R1-1805630 | Summary of 7.2.2 Study of necessity of a new DCI format | discussion | Huawei |
R1-92 AI: 7.2.2 |
noted | [WTS] [JSN] | |||
R1-1805631 | Draft reply LS on Message 3 size for NR |
LS out LS is reply to R2-1804073 LS To: RAN2 revised to R1-1805647 |
NTT DOCOMO, INC., CMCC, Orange, Deutsche Telekom, Vodafone | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
revised | [WTS] [JSN] | |
R1-1805632 | Summary of Offline Discussion for NR RRM measurements |
discussion revision of R1-1805609 revised to R1-1805696 |
Intel | NR_newRAT-Core |
R1-92 AI: 7.1.1.5.1 |
revised | [WTS] [JSN] | ||
R1-1805633 | Offline summary on the study of necessity of PDCCH repetition | discussion | Qualcomm |
R1-92 AI: 7.2.3 |
noted | [WTS] [JSN] | |||
R1-1805634 | Summary of MSG3 timing discussion | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
noted | [WTS] [JSN] | |
R1-1805635 | Second Summary of Issues for PDSCH/PUSCH’s DM-RS |
discussion revision of R1-1805611 revised to R1-1805691 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.3 |
revised | [WTS] [JSN] | |
R1-1805636 | Partially overlapped PUCCH resources | discussion | Ericsson |
R1-92 AI: 7.1.3.2.1 |
noted | [WTS] [JSN] | |||
R1-1805637 | Way Forward on UL Power Control Regarding NR Scheduling | discussion | MediaTek |
R1-92 AI: 7.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1805638 | Summary of offline discussion on 7.1.3.1.4 part II | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.4 |
noted | [WTS] [JSN] | |
R1-1805639 | WF on default PDCCH and PUCCH beams | discussion | LG Electronics, InterDigital, Samsung, vivo |
R1-92 AI: 7.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1805640 | WF on UE capability for SP-SRS | discussion | Samsung, KDDI, Ericsson, ZTE, Sanechips, LGE, Verizon Wireless, InterDigital, vivo, KT, NTT DOCOMO, SK Telecom, CHTTL |
R1-92 AI: 7.1.2.2.3 |
noted | [WTS] [JSN] | |||
R1-1805641 | Way Forward on NR peak data rate formula | discussion | Intel, Samsung, MediaTek, Huawei, HiSilicon, Apple, Vivo, OPPO |
R1-92 AI: 7.1.3.3.1 |
noted | [WTS] [JSN] | |||
R1-1805642 | Summary of Wednesday offline discussion on Support of Separate CQI and MCS table(s) for URLLC |
discussion revision of R1-1805613 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.2.1 |
noted | [WTS] [JSN] | |
R1-1805643 | Summary of discussion on mobility evaluation method and parameters | discussion | Huawei |
R1-92 AI: 7.8.1 |
noted | [WTS] [JSN] | |||
R1-1805644 | Summary of discussion on eMBB evaluation method and parameters for FR2 | other | Huawei |
R1-92 AI: 7.8.1 |
noted | [WTS] [JSN] | |||
R1-1805645 | Text Proposals on Polar Codes | discussion | Samsung |
R1-92 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-1805646 | Repetition for PUSCH mapping Type B | discussion | NTT DOCOMO, INC. |
R1-92 AI: 7.1.3.3.4 |
noted | [WTS] [JSN] | |||
R1-1805647 | Draft reply LS on Message 3 size for NR |
LS out LS is reply to R2-1804073 LS To: RAN2 revision of R1-1805631 revised to R1-1805657 |
NTT DOCOMO, INC., CMCC, Orange, Deutsche Telekom, Vodafone, AT&T | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
revised | [WTS] [JSN] | |
R1-1805648 | Summary of remaining details on PRACH format |
discussion revision of R1-1805577 revised to R1-1805738 |
Convida Wireless | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.1 |
revised | [WTS] [JSN] | |
R1-1805649 | [DRAFT] LS on Rx beam selection for RRM measurements |
LS out LS To: RAN4 revised to R1-1805760 |
Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.1 |
revised | [WTS] [JSN] | |
R1-1805650 | Summary of remaining details on RACH procedure |
discussion revision of R1-1805614 revised to R1-1805701 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
revised | [WTS] [JSN] | |
R1-1805651 | [DRAFT] LS on SSB frequency location of Pscell |
LS out LS To: RAN2 revised to R1-1805717 |
Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.1 |
revised | [WTS] [JSN] | |
R1-1805652 | Summary of NTN offline discussions | discussion | Thales | FS_NR_nonterr_nw | Rel-15 |
R1-92 AI: 7.3 |
available | [WTS] [JSN] | |
R1-1805653 | LS on Max TBS for PDSCH containing RMSI |
LS out LS To: RAN2 revision of R1-1805617 |
RAN1, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.2 |
approved | [WTS] [JSN] | |
R1-1805654 | WF on SRS antenna switching | other | CMCC, ZTE, Sanechips, Ericsson, CATT, Sony, OPPO, NEC, Nokia, Nokia Shanghai Bell |
R1-92 AI: 7.1.2.3.5 |
noted | [WTS] [JSN] | |||
R1-1805655 | Summary of offline for search space | discussion | NTT DOCOMO | Rel-15 |
R1-92 AI: 7.1.3.1.2 |
noted | [WTS] [JSN] | ||
R1-1805656 | Offline discussion summary on GC-PDCCH carrying SFI |
discussion revision of R1-1805559 revised to R1-1805720 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.3 |
revised | [WTS] [JSN] | |
R1-1805657 | Reply LS on Message 3 size for NR |
LS out LS is reply to R2-1804073 LS To: RAN2 revision of R1-1805647 |
RAN1, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
approved | [WTS] [JSN] | |
R1-1805658 | Summary of bandwidth part remaining issues |
discussion revision of R1-1805543 revised to R1-1805693 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
revised | [WTS] [JSN] | |
R1-1805659 | Modelling of the Doppler effect in V2V sidelink channel | discussion | Huawei, HiSilicon | FS_LTE_NR_V2X_eval | Rel-15 |
R1-92 AI: 7.5.2 |
available | [WTS] [JSN] | |
R1-1805660 | Feature lead summary on QCL |
discussion revision of R1-1805593 |
Nokia | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.7 |
noted | [WTS] [JSN] | |
R1-1805661 | Draft LS on time domain behavior for CSI-RS and CSI-IM |
LS out LS To: RAN2 revised to R1-1805621 |
ZTE | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.1 |
revised | [WTS] [JSN] | |
R1-1805662 | [Draft] Reply LS on SI Reception in BWP |
LS out LS To: RAN2 revised to R1-1805726 |
LGE, MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
revised | [WTS] [JSN] | |
R1-1805663 | Summary of offline discussion on 7.1.3.3.1 part II | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.1 |
noted | [WTS] [JSN] | |
R1-1805664 | Summary of offline for 7.1.3.3.5 | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.5 |
noted | [WTS] [JSN] | |
R1-1805665 | Offline summary 2 for Al 7.1.6.1 NR UL power control in non-CA aspects | discussion | ZTE | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.6.1 |
available | [WTS] [JSN] | |
R1-1805666 | Summary of remaining issues for UCI multiplexing on PUSCH |
discussion revision of R1-1805599 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.3 |
noted | [WTS] [JSN] | |
R1-1805667 | Summary of offline discussion on PUCCH resource allocation |
discussion revision of R1-1805612 revised to R1-1805742 |
OPPO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.4 |
revised | [WTS] [JSN] | |
R1-1805668 | WF on DMRS scrambling ID for fall-back DCIs | discussion | Samsung, LG Electronics, Spreadtrum, KT, ITL, KRRI, WILUS | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.3 |
available | [WTS] [JSN] | |
R1-1805669 | WF on Type I CSI for rank 8 | discussion | LG Electronics, Ericsson |
R1-92 AI: 7.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1805670 | TP for chapter 6 of TR38.811 |
other revision of R1-1804304 |
Huawei, HiSilicon, Thales |
R1-92 AI: 7.3.2 |
available | [WTS] [JSN] | |||
R1-1805671 | Summary of offline discussion on eV2X evaluation methodology |
discussion revision of R1-1805581 |
LG Electronics | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.5 |
noted | [WTS] [JSN] | |
R1-1805672 | WF on Simulation Scenarios for IAB SI | discussion | AT&T, Ericsson, KDDI, Samsung, Qualcomm, ZTE | FS_NR_IAB | Rel-15 |
R1-92 AI: 7.7.2 |
available | [WTS] [JSN] | |
R1-1805673 | Summary of 7.7.1 Enhancements to support NR backhaul links | discussion | AT&T | FS_NR_IAB | Rel-15 |
R1-92 AI: 7.7.1 |
noted | [WTS] [JSN] | |
R1-1805674 | Summary of 7.7.2 Evaluation Methodology for NR IAB | discussion | AT&T | FS_NR_IAB | Rel-15 |
R1-92 AI: 7.7.2 |
noted | [WTS] [JSN] | |
R1-1805675 | WF on Beam Failure Recovery | discussion | Samsung, CATT, Intel, MediaTek, OPPO, Spreadtrum, ASUSTEK, NEC, InterDigital, Qualcomm, ZTE, Sanechips, Huawei, HiSilicon, CHTTL, CMCC |
R1-92 AI: 7.1.2.2.4 |
available | [WTS] [JSN] | |||
R1-1805676 | [Draft] LS on RMSI CORESET configuration for a band with 15kHz SSB SCS and 10MHz minimum channel bandwidth |
LS out LS To: RAN4, RAN2 revised to R1-1805712 |
CATT | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.2 |
revised | [WTS] [JSN] | |
R1-1805677 | Summary of offline discussion for NR-U | discussion | Qualcomm | FS_NR_unlic | Rel-15 |
R1-92 AI: 7.6 |
available | [WTS] [JSN] | |
R1-1805678 | Summary of SRS |
discussion revision of R1-1805522 revised to R1-1805695 |
Sony | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.5 |
revised | [WTS] [JSN] | |
R1-1805679 | Summary on Paging design |
discussion revision of R1-1805508 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.3 |
noted | [WTS] [JSN] | |
R1-1805680 | NR-NTN Channel Modeling – Text proposal for the 6th clause of TR38.811 |
discussion revision of R1-1805116 |
THALES | Rel-15 |
R1-92 AI: 7.3.1 |
available | [WTS] [JSN] | ||
R1-1805681 | Summary of offline email discussion on SLS assumptions | discussion | ZTE, Sanechips | FS_NR_NOMA | Rel-15 |
R1-92 AI: 7.4.4 |
noted | [WTS] [JSN] | |
R1-1805682 | Summary of offline discussion on LLS clarifications | discussion | ZTE, Sanechips | FS_NR_NOMA | Rel-15 |
R1-92 AI: 7.4.4 |
noted | [WTS] [JSN] | |
R1-1805683 | Offline summary on compact DCI and PDCCH repetition | discussion | Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.2.3 |
noted | [WTS] [JSN] | |
R1-1805684 | URLLC Wednesday Offline summary | discussion | vivo | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.2.4 |
noted | [WTS] [JSN] | |
R1-1805685 | Remaining issues on CSI-RS #2 | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.2 |
noted | [WTS] [JSN] | |
R1-1805686 | Simultaneous Decoding of System Information | discussion | Qualcomm |
R1-92 AI: 7.1.3.3.2 |
noted | [WTS] [JSN] | |||
R1-1805687 | Baseline Capability #1 Remaining Issues | discussion | Qualcomm |
R1-92 AI: 7.1.3.3.2 |
noted | [WTS] [JSN] | |||
R1-1805688 | Aggressive Capability #2 Processing Time | discussion | Qualcomm |
R1-92 AI: 7.1.3.3.2 |
noted | [WTS] [JSN] | |||
R1-1805689 | Summary 2 on Remaining issues on Beam Failure Recovery |
discussion revised to R1-1805730 |
MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
noted | [WTS] [JSN] | |
R1-1805690 | Offline discussion summary on QCL | discussion | Nokia | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.7 |
noted | [WTS] [JSN] | |
R1-1805691 | Second Summary of Issues for PDSCH/PUSCH’s DM-RS |
discussion revision of R1-1805635 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.3 |
noted | [WTS] [JSN] | |
R1-1805692 | Summary of views on CSI reporting v8 |
other revision of R1-1805594 |
Ericsson |
R1-92 AI: 7.1.2.2.2 |
noted | [WTS] [JSN] | |||
R1-1805693 | Summary of bandwidth part remaining issues |
discussion revision of R1-1805658 revised to R1-1805750 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
revised | [WTS] [JSN] | |
R1-1805694 | Summary #2 for TRS | discussion | MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.6 |
noted | [WTS] [JSN] | |
R1-1805695 | Summary #2 of SRS |
discussion revision of R1-1805678 |
Sony | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.5 |
noted | [WTS] [JSN] | |
R1-1805696 | Summary of Offline Discussion for NR RRM measurements |
discussion revision of R1-1805632 revised to R1-1805736 |
Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.1 |
revised | [WTS] [JSN] | |
R1-1805697 | Summary of Offline Discussion for NR Radio Link Monitoring |
discussion revision of R1-1805608 revised to R1-1805737 |
Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.2 |
revised | [WTS] [JSN] | |
R1-1805698 | Multiplexing rules for PUCCH resources with the same starting symbols | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.1 |
noted | [WTS] [JSN] | |
R1-1805699 | SR ID for multiple overlapping SR PUCCHs with UCI PUCCH | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.1 |
available | [WTS] [JSN] | |
R1-1805700 | Draft LS on aperiodic SRS triggering |
LS out LS To: RAN2 revised to R1-1805625 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.5 |
revised | [WTS] [JSN] | |
R1-1805701 | Summary of remaining details on RACH procedure |
discussion revision of R1-1805650 revised to R1-1805754 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
revised | [WTS] [JSN] | |
R1-1805702 | Summary of offline discussion on 7.1.3.3.1 (resource allocation) – part III | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.1 |
noted | [WTS] [JSN] | |
R1-1805703 | Summary of offline discussions on 7.1.3.1.4 (DCI contents and formats) – part III |
discussion revised to R1-1805735 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.4 |
revised | [WTS] [JSN] | |
R1-1805704 | Feature lead summary 2 of remaining issues for RS multiplexing | discussion | Huawei,HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.1 |
noted | [WTS] [JSN] | |
R1-1805705 | Chairman's notes of AI 7.6 SI on NR-based access to unlicensed spectrum | other | Ad-Hoc chair (Ericsson) | FS_NR_unlic | Rel-15 |
R1-92 AI: 7.6 |
endorsed | [WTS] [JSN] | |
R1-1805706 | Chairman's notes of 7.3 SI on NR to support non-terrestrial networks | other | Ad-Hoc chair (Samsung) | FS_NR_nonterr_nw | Rel-15 |
R1-92 AI: 7.3 |
endorsed | [WTS] [JSN] | |
R1-1805707 | Chairman's notes of AI 7.1.7 on NR - UE features | other | Ad-hoc chair (NTT DOCOMO, AT&T) | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.7 |
endorsed | [WTS] [JSN] | |
R1-1805708 | Chairman's notes of AI 7.1.6 UL Power control | other | Ad-Hoc chair (Samsung) | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.6 |
endorsed | [WTS] [JSN] | |
R1-1805709 | Chairman's notes of AI 7.1.5 NR-LTE co-existence | other | Ad-Hoc chair (Ericsson) | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.5 |
endorsed | [WTS] [JSN] | |
R1-1805710 | Chairman's notes of AI 7.1.4 Channel coding | other | Ad-hoc chair (Ericsson) | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.4 |
endorsed | [WTS] [JSN] | |
R1-1805711 | Chairman's notes of AI 7.1.2 NR MIMO | other | Ad-Hoc chair (Samsung) | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2 |
endorsed | [WTS] [JSN] | |
R1-1805712 | LS on RMSI CORESET configuration for a band with 15kHz SSB SCS and 10MHz minimum channel bandwidth |
LS out LS To: RAN4, RAN2 revision of R1-1805676 |
RAN1, CATT | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.2 |
approved | [WTS] [JSN] | |
R1-1805713 | [Draft] Reply LS response on handling parallel RA procedure and SR procedure |
LS out LS is reply to R2-1803856 LS To: RAN2 revised to R1-1805759 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
revised | [WTS] [JSN] | |
R1-1805714 | [Draft] LS on NR BFR |
LS out LS To: RAN2 revised to R1-1805623 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
revised | [WTS] [JSN] | |
R1-1805715 | [Draft] LS on NR CSI-RS |
LS out LS To: RAN2 revised to R1-1805740 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.2 |
revised | [WTS] [JSN] | |
R1-1805716 | [DRAFT] LS on beamFailureRecoveryTimer |
LS out LS To: RAN2 revised to R1-1805622 |
InterDigital | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
revised | [WTS] [JSN] | |
R1-1805717 | LS on SSB frequency location of Pscell |
LS out LS To: RAN2 revision of R1-1805651 |
RAN1, Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.1 |
approved | [WTS] [JSN] | |
R1-1805718 | [DRAFT] Reply LS on RAN1 on Beam- and Cell- Radio-Link-Monitoring |
LS out LS is reply to R2-1804066 LS To: RAN2 revised to R1-1805761 |
Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.2 |
revised | [WTS] [JSN] | |
R1-1805719 | Offline summary on CA aspects | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.2 |
noted | [WTS] [JSN] | |
R1-1805720 | Offline discussion summary on GC-PDCCH carrying SFI |
discussion revision of R1-1805656 revised to R1-1805725 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.3 |
revised | [WTS] [JSN] | |
R1-1805721 | Way Forward on LTE Peak Data Rate Calculation for EN-DC | discussion | Huawei, HiSilicon, Intel |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1805722 | Offline discussion summary on non-codebook based transmission | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.1.3 |
noted | [WTS] [JSN] | |
R1-1805723 | Derivation of k0 | discussion | Qualcomm | Rel-15 |
R1-92 AI: 7.1.1.1 |
available | [WTS] [JSN] | ||
R1-1805724 | EN-DC TDM with CA | discussion | Qualcomm | Rel-15 |
R1-92 AI: 7.1.5 |
available | [WTS] [JSN] | ||
R1-1805725 | Offline discussion summary on GC-PDCCH carrying SFI |
discussion revision of R1-1805720 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.3 |
noted | [WTS] [JSN] | |
R1-1805726 | Reply LS on SI Reception in BWP |
LS out LS To: RAN2 revision of R1-1805662 |
RAN1, LGE, MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
approved | [WTS] [JSN] | |
R1-1805727 | [Draft] LS on active BWP switching delay specification |
LS out LS To: RAN4 revised to R1-1805755 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
revised | [WTS] [JSN] | |
R1-1805728 | NR UE features list | discussion | NTT DOCOMO, AT&T |
R1-92 AI: 7.1.7 |
available | [WTS] [JSN] | |||
R1-1805729 | Draft LS on NR UE features |
LS out LS To: RAN2, RAN4 revised to R1-1805752 |
NTT DOCOMO, AT&T | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.7 |
revised | [WTS] [JSN] | |
R1-1805730 | Summary 3 on Remaining issues on Beam Failure Recovery |
discussion revision of R1-1805689 |
MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.4 |
noted | [WTS] [JSN] | |
R1-1805731 | Summary of text proposals on CBG based retransmission | discussion | LG Electronics | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.3 |
noted | [WTS] [JSN] | |
R1-1805732 | On CGS ordering for NR |
other revision of R1-1804433 |
Huawei, HiSilicon, ZTE, Sanechips |
R1-92 AI: 7.1.3.2.5 |
available | [WTS] [JSN] | |||
R1-1805733 | Outcome of the offline discussion for PUCCH structure in long-duration | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.2 |
noted | [WTS] [JSN] | |
R1-1805734 | Final Summary of Issues for PDSCH/PUSCH’s DM-RS | discussion | Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.3 |
withdrawn | [WTS] [JSN] | |
R1-1805735 | Summary of offline discussions on 7.1.3.1.4 (DCI contents and formats) – part III |
discussion revision of R1-1805703 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.1.4 |
noted | [WTS] [JSN] | |
R1-1805736 | Summary of Offline Discussion for NR RRM measurements |
discussion revision of R1-1805696 |
Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.1 |
available | [WTS] [JSN] | |
R1-1805737 | Summary of Offline Discussion for NR Radio Link Monitoring |
discussion revision of R1-1805697 |
Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.2 |
available | [WTS] [JSN] | |
R1-1805738 | Summary of remaining details on PRACH format |
discussion revision of R1-1805648 |
Convida Wireless | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.1 |
available | [WTS] [JSN] | |
R1-1805739 | Draft LS on UL cross carrier beam indication |
LS out LS To: RAN2 revised to R1-1805627 |
Samsung | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.2.3 |
revised | [WTS] [JSN] | |
R1-1805740 | [Draft] LS on NR CSI-RS |
LS out LS To: RAN2 revision of R1-1805715 revised to R1-1805626 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.2 |
revised | [WTS] [JSN] | |
R1-1805741 | Summary of Offline Discussion on RMSI |
discussion revision of R1-1805600 |
CATT |
R1-92 AI: 7.1.1.2.2 |
noted | [WTS] [JSN] | |||
R1-1805742 | Summary of offline discussion on PUCCH resource allocation |
discussion revision of R1-1805667 |
OPPO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.4 |
available | [WTS] [JSN] | |
R1-1805743 | Summary of EN-DC LTE and NR data rate | discussion | Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.1 |
available | [WTS] [JSN] | |
R1-1805744 | Reply LS on eV2X evaluation methodology |
LS in LS is reply to R1-1719239 LS To: RAN, RAN1 |
SAE C-V2X TC Advanced Application Task-Force, AT&T | FS_LTE_NR_V2X_eval | Rel-15 |
R1-92 AI: 5 |
treated | [WTS] [JSN] | |
R1-1805745 | Summary of TA related aspects |
discussion revised to R1-1805757 |
Panasonic | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.6 |
revised | [WTS] [JSN] | |
R1-1805746 | Summary of DL/UL scheduling and HARQ management |
discussion revision of R1-1805540 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.3.2 |
noted | [WTS] [JSN] | |
R1-1805747 | TP to 38.214 on UE processing time definitions | other | Qualcomm |
R1-92 AI: 7.1.3.3.2 |
agreed | [WTS] [JSN] | |||
R1-1805748 | Summary of 7.1.1.1 Synchronization signal |
discussion revision of R1-1805595 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.1 |
noted | [WTS] [JSN] | |
R1-1805749 | Summary of 7.1.1.2.1 NR-PBCH |
discussion revision of R1-1805596 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.2.1 |
withdrawn | [WTS] [JSN] | |
R1-1805750 | Summary of bandwidth part remaining issues |
discussion revision of R1-1805693 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
noted | [WTS] [JSN] | |
R1-1805751 | [DRAFT] LS on RRC parameters for NR |
LS out LS To: RAN2 revised to R1-1805766 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
revised | [WTS] [JSN] | |
R1-1805752 | LS on NR UE features |
LS out LS To: RAN2, RAN4 revision of R1-1805729 |
RAN1, NTT DOCOMO, AT&T | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.7 |
approved | [WTS] [JSN] | |
R1-1805753 | Draft reply LS on LTE peak data rate calculation for EN-DC |
LS out LS is reply to R2-1803950 LS To: RAN2 revision of R1-1803699 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
available | [WTS] [JSN] | |
R1-1805754 | Summary of remaining details on RACH procedure |
discussion revision of R1-1805701 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
available | [WTS] [JSN] | |
R1-1805755 | LS on active BWP switching delay specification |
LS out LS To: RAN4 revision of R1-1805727 |
RAN1, MediaTek | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.4.1 |
approved | [WTS] [JSN] | |
R1-1805756 | Draft reply LS on RAN2 agreements on RRM |
LS out LS To: RAN2 revised to R1-1805762 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5 |
revised | [WTS] [JSN] | |
R1-1805757 | Summary of TA related aspects |
discussion revision of R1-1805745 |
Panasonic | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.6 |
noted | [WTS] [JSN] | |
R1-1805758 | [Draft] LS for supporting aperiodic TRS |
LS out LS To: RAN2 revised to R1-1805763 |
AT&T | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.6 |
revised | [WTS] [JSN] | |
R1-1805759 | Reply LS response on handling parallel RA procedure and SR procedure |
LS out LS is reply to R2-1803856 LS To: RAN2 revision of R1-1805713 |
RAN1, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.4.2 |
approved | [WTS] [JSN] | |
R1-1805760 | LS on Rx beam selection for RRM measurements |
LS out LS To: RAN4 LS reply in R4-1809011, R4-1809080, R4-1809411, R4-1810662, R4-1812981 revision of R1-1805649 |
RAN1, Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.1 |
approved | [WTS] [JSN] | |
R1-1805761 | Reply LS on RAN1 on Beam- and Cell- Radio-Link-Monitoring |
LS out LS is reply to R2-1804066 LS To: RAN2 revision of R1-1805718 |
RAN1, Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.2 |
approved | [WTS] [JSN] | |
R1-1805762 | Reply LS on RAN2 agreements on RRM |
LS out LS To: RAN2 revision of R1-1805756 |
RAN1, Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.1.5.1 |
approved | [WTS] [JSN] | |
R1-1805763 | LS for supporting aperiodic TRS |
LS out LS To: RAN2 revision of R1-1805758 |
RAN1, AT&T | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.2.3.6 |
approved | [WTS] [JSN] | |
R1-1805764 | Summary of offline discussion | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1.3.2.1 |
noted | [WTS] [JSN] | |
R1-1805765 | LS on RAN1 input to TS38.300 |
LS out LS To: RAN2 revision of R1-1805558 |
RAN1, Nokia | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7 |
approved | [WTS] [JSN] | |
R1-1805766 | LS on RRC parameters for NR |
LS out LS To: RAN2 revision of R1-1805751 |
RAN1, Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
approved | [WTS] [JSN] | |
R1-1805767 | Agreement summary for Rel-15 Even further enhanced MTC for LTE | other | Ericsson | LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 6.2.6 |
available | [WTS] [JSN] | |
R1-1805768 | LS on RRC parameter list for L1 configuration of Rel-15 LTE-MTC |
LS out LS To: RAN2 |
RAN1, Ericsson | LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 6.2.6 |
approved | [WTS] [JSN] | |
R1-1805769 | Corrections on shortened processing time and shortened TTI in 36 212 |
CR revision of R1-1803954 revised to R1-1807913 |
Huawei | 36.212 15.1.0 CR#2801 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
agreed | [WTS] [JSN] |
R1-1805770 | Introduction of FeLAA into 36.212 |
CR revision of R1-1805418 revised to R1-1807914 |
Huawei | 36.212 15.1.0 CR#2901 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
agreed | [WTS] [JSN] |
R1-1805771 | Introduction of further enhancements of NB-IoT |
draftCR revision of R1-1804148 |
Huawei, HiSilicon | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 6.2.7 |
revised | [WTS] [JSN] | |
R1-1805772 | Introduction of FeMTC into 36.212 |
draftCR revision of R1-1804149 |
Huawei, HiSilicon | LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 6.2.6 |
revised | [WTS] [JSN] | |
R1-1805773 | Introduction of V2X Phase 2 based on LTE |
draftCR revised to R1-1807401 |
Huawei | LTE_eV2X-Core | Rel-15 |
R1-92 AI: 6.2.5 |
revised | [WTS] [JSN] | |
R1-1805774 | draftCR to 38.211 capturing the RAN1#92bis meeting agreements |
draftCR revised to R1-1805793 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
revised | [WTS] [JSN] | |
R1-1805775 | draftCR to 38.212 capturing the RAN1#92bis meeting agreements |
draftCR revised to R1-1805794 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
revised | [WTS] [JSN] | |
R1-1805776 | draftCR to 38.213 capturing the RAN1#92bis meeting agreements |
draftCR revised to R1-1805795 |
Samsung | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
revised | [WTS] [JSN] | |
R1-1805777 | draftCR to 38.214 capturing the RAN1#92bis meeting agreements |
draftCR revised to R1-1805796 |
Nokia | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
revised | [WTS] [JSN] | |
R1-1805778 | draftCR to 38.215 capturing the RAN1#92bis meeting agreements |
draftCR revised to R1-1805797 |
Intel | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
revised | [WTS] [JSN] | |
R1-1805779 | draftCR to 38.202 capturing the RAN1#92bis meeting agreements |
draftCR revised to R1-1805792 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
revised | [WTS] [JSN] | |
R1-1805780 | Corrections to sTTI and SPT implementation |
CR revised to R1-1807925 |
Ericsson | 36.211 15.1.0 CR#440 catF | LTE_sTTIandPT-Core | Rel-15 |
R1-92 AI: 6.2.1 |
endorsed | [WTS] [JSN] |
R1-1805781 | Introduction of enhancements to operation in unlicensed spectrum |
CR revised to R1-1807930 |
Ericsson | 36.211 15.1.0 CR#441 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
agreed | [WTS] [JSN] |
R1-1805782 | Reply LS on maximum number of CCs for NR CA |
LS out LS is reply to R2-1804052 LS To: RAN2 |
RAN1, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-92 AI: 5 |
approved | [WTS] [JSN] | |
R1-1805783 | List of physical layer RRC parameters for Ultra Reliable Low Latency Communication for LTE | discussion | Ericsson |
R1-92 AI: 6.2.8 |
agreed | [WTS] [JSN] | |||
R1-1805784 | LS on RRC parameter list for Ultra Reliable Low Latency Communication for LTE |
LS out LS To: RAN2 |
RAN1, Ericsson | LTE_HRLLC-Core | Rel-15 |
R1-92 AI: 6.2.8 |
approved | [WTS] [JSN] | |
R1-1805785 | LS on RRC and LPP parameter list for further NB-IoT enhancements |
LS out LS To: RAN2, RAN3 |
RAN1, Huawei | NB_IOTenh2-Core | Rel-15 |
R1-92 AI: 6.2.7 |
approved | [WTS] [JSN] | |
R1-1805786 | List of RRC and LPP parameters for further NB-IoT enhancements | discussion | Huawei | Rel-15 |
R1-92 AI: 6.2.7 |
agreed | [WTS] [JSN] | ||
R1-1805787 | List of RRC parameters for L1 configuration of Rel-15 LTE-MTC |
discussion revision of R1-1804119 |
Ericsson | LTE_eMTC4-Core | Rel-15 |
R1-92 AI: 6.2.6 |
agreed | [WTS] [JSN] | |
R1-1805788 | TS 37.213 v0.1.1 Physical layer procedures for shared spectrum channel access |
draft TS revision of R1-1805416 revised to R1-1805790 |
Ericsson | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.6 |
revised | [WTS] [JSN] | |
R1-1805789 | RAN1 agreements for LTE V2X Phase 2 | other | Huawei | LTE_eV2X-Core | Rel-15 |
R1-92 AI: 6.2.5 |
available | [WTS] [JSN] | |
R1-1805790 | TS 37.213 v0.2.0 Physical layer procedures for shared spectrum channel access |
draft TS revision of R1-1805788 |
Ericsson | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.6 |
endorsed | [WTS] [JSN] | |
R1-1805791 | LS on UE Capabilities for LTE_unlic |
LS out LS To: RAN2 |
RAN1, Nokia | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2.3 |
approved | [WTS] [JSN] | |
R1-1805792 | CR to 38.202 capturing the RAN1#92bis meeting agreements |
CR revision of R1-1805779 revised to R1-1807954 |
Qualcomm | 38.202 15.1.0 CR#2 catF | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
endorsed | [WTS] [JSN] |
R1-1805793 | CR to 38.211 capturing the RAN1#92bis meeting agreements |
CR revision of R1-1805774 revised to R1-1807955 |
Ericsson | 38.211 15.1.0 CR#2 catF | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
endorsed | [WTS] [JSN] |
R1-1805794 | CR to 38.212 capturing the RAN1#92bis meeting agreements |
CR revision of R1-1805775 revised to R1-1807956 |
Huawei | 38.212 15.1.1 CR#2 catF | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
endorsed | [WTS] [JSN] |
R1-1805795 | CR to 38.213 capturing the RAN1#92bis meeting agreements |
CR revision of R1-1805776 revised to R1-1807957 |
Samsung | 38.213 15.1.0 CR#2 catF | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
endorsed | [WTS] [JSN] |
R1-1805796 | CR to 38.214 capturing the RAN1#92bis meeting agreements |
CR revision of R1-1805777 revised to R1-1807958 |
Nokia | 38.214 15.1.0 CR#2 catF | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
endorsed | [WTS] [JSN] |
R1-1805797 | CR to 38.215 capturing the RAN1#92bis meeting agreements |
CR revision of R1-1805778 revised to R1-1807959 |
Intel | 38.215 15.1.0 CR#3 catF | NR_newRAT-Core | Rel-15 |
R1-92 AI: 7.1 |
endorsed | [WTS] [JSN] |
R1-1805798 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s00-s05 |
CR revision of R1-1804489 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#10541 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
agreed | [WTS] [JSN] |
R1-1805799 | Introduction of Enhancements to LTE operation in unlicensed spectrum into 36.213 s06-s09 |
CR revision of R1-1804490 revised to R1-1807931 |
Motorola Mobility Germany GmbH | 36.213 15.1.0 CR#10551 catB | LTE_unlic-Core | Rel-15 |
R1-92 AI: 6.2.2 |
agreed | [WTS] [JSN] |
2230 documents (1.0833477973938 seconds)