[{"name":"R1-1803896","title":"Consideration for maximum time reduction between packet arrival at layer 1 and resource selection for transmission","source":"ZTE, Sanechips","contact":"Carolyn Taylor","contact-id":19440,"tdoctype":"discussion","for":"","abstract":"","secretary_remarks":"","agenda_item_sort_order":47,"ainumber":"6.2.5.5","ainame":"Maximum time reduction between packet arrival at layer 1 and resource selection for transmission","tdoc_agenda_sort_order":38960,"status":"available","reservation_date":"2018-04-02 11:53:04","uploaded":"2018-04-06 22:27:40","revisionof":"","revisedto":"","release":"","crspec":"","crspecversion":"","workitem":"","crnumber":"","crrevision":"","crcategory":"","tsg_crp":"","lsreplyto":"","lsto":"","Cc":"","lsoriginalls":"","lsreply":"","link":"https:\/\/www.3gpp.org\/ftp\/TSG_RAN\/WG1_RL1\/TSGR1_92b\/Docs\/R1-1803896.zip","group":"R1","meeting":"R1-92","year":2018,"uicc_affected":null,"me_affected":null,"ran_affected":null,"cn_affected":null,"clauses_affected":null,"crsinpack":null,"crsinpacknumber":0}]