Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-156028 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions |
report revised to S5-156393 |
Rapporteur |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156135 | dCR R14 32.101-c00 Introduction of VNF in mobile networks |
draftCR revision of S5-155164 revised to S5-156266 |
Ericsson |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156141 | pCR Guideline for organization of NFV management work items |
pCR revised to S5-156267 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156142 | pCR TS 28.500 Adding general business level requirements |
pCR revised to S5-156269 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156143 | pCR TS 28.500 Adding business level FM requirements |
pCR revised to S5-156270 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156144 | pCR TS 28.500 Adding specification level FM requirements |
pCR revised to S5-156271 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156145 | pCR TS 28.500 Adding business level CM requirements |
pCR revised to S5-156272 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156146 | pCR TS 28.500 Adding specification level CM requirements |
pCR revised to S5-156315 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156147 | pCR TS 28.500 Adding business level PM requirements |
pCR revised to S5-156316 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156148 | pCR TS 28.500 Adding specification level PM requirements |
pCR revised to S5-156317 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156149 | pCR TS 28.500 Adding business level LCM requirements |
pCR revised to S5-156318 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156150 | pCR TS 28.500 Adding specification level LCM requirements |
pCR revised to S5-156319 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156151 | pCR TS 28.500 Editorial change on terminology |
pCR revised to S5-156320 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156157 | LS Response to 3GPP SA5 on guidelines for cooperation between 3GPP TSG SA WG5 and ETSI ISG NFV |
LS in LS reply in S5-156321 |
ETSI ISG NFV |
S5-104 AI: 6.5.1.1 |
replied to | [WTS] [JSN] | |||
S5-156167 | pCR TS 28.500 Add concept information on Network Service |
pCR revised to S5-156322 |
Huawei Tech.(UK) Co., Ltd | 28.5 | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] |
S5-156169 | pCR TS 28.500 Add the relationship between VNF and NE |
pCR revised to S5-156324 |
Huawei Tech.(UK) Co., Ltd | 28.5 | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] |
S5-156170 | pCR TS 28.500 Addition of business level requirements |
pCR revised to S5-156325 |
Huawei Tech.(UK) Co., Ltd | 28.5 | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] |
S5-156266 | dCR R14 32.101-c00 Introduction of VNF in mobile networks |
draftCR revision of S5-156135 revised to S5-156394 |
Ericsson |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156267 | pCR Guideline for organization of NFV management work items |
pCR revision of S5-156141 revised to S5-156314 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156269 | pCR TS 28.500 Adding general business level requirements |
pCR revision of S5-156142 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156270 | pCR TS 28.500 Adding business level FM requirements |
pCR revision of S5-156143 revised to S5-156395 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156271 | pCR TS 28.500 Adding specification level FM requirements |
pCR revision of S5-156144 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156272 | pCR TS 28.500 Adding business level CM requirements |
pCR revision of S5-156145 revised to S5-156396 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156314 | Guideline for organization of NFV management work items |
discussion revision of S5-156267 revised to S5-156374 |
China Mobile Com. Corporation,Nokia Networks |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156316 | pCR TS 28.500 Adding business level PM requirements |
pCR revision of S5-156147 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156317 | pCR TS 28.500 Adding specification level PM requirements |
pCR revision of S5-156148 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156318 | pCR TS 28.500 Adding business level LCM requirements |
pCR revision of S5-156149 revised to S5-156397 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156319 | pCR TS 28.500 Adding specification level LCM requirements |
pCR revision of S5-156150 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
noted | [WTS] [JSN] | |||
S5-156320 | pCR TS 28.500 Editorial change on terminology |
pCR revision of S5-156151 revised to S5-156398 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156321 | Reply to: LS Response to 3GPP SA5 on guidelines for cooperation between 3GPP TSG SA WG5 and ETSI ISG NFV |
LS out LS is reply to S5-156157 LS To: ETSI ISG NFV |
Ericsson |
S5-104 AI: 6.5.1.1 |
available | [WTS] [JSN] | |||
S5-156322 | pCR TS 28.500 Add concept information on Network Service |
pCR revision of S5-156167 |
Huawei Tech.(UK) Co., Ltd | 28.5 | OAM14-MAMO_VNF-MCAR |
S5-104 AI: 6.5.1.1 |
noted | [WTS] [JSN] | |
S5-156323 | LS on service definition |
LS out LS To: SA1 revised to S5-156399 |
Huawei |
S5-104 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-156324 | pCR TS 28.500 Add the relationship between VNF and NE |
pCR revision of S5-156169 |
Huawei Tech.(UK) Co., Ltd | 28.5 | OAM14-MAMO_VNF-MCAR |
S5-104 AI: 6.5.1.1 |
noted | [WTS] [JSN] | |
S5-156325 | pCR TS 28.500 Addition of business level requirements |
pCR revision of S5-156170 |
Huawei Tech.(UK) Co., Ltd | 28.5 | OAM14-MAMO_VNF-MCAR |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |
S5-156360 | LS to ETSI ISG NFV on modelling | LS out | Intel |
S5-104 AI: 6.5.1.1 |
reserved | [WTS] [JSN] | |||
S5-156374 | Guideline for organization of NFV management work items |
discussion revision of S5-156314 |
China Mobile Com. Corporation,Nokia Networks |
S5-104 AI: 6.5.1.1 |
endorsed | [WTS] [JSN] | |||
S5-156393 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions |
report revision of S5-156028 |
Rapporteur |
S5-104 AI: 6.5.1.1 |
noted | [WTS] [JSN] | |||
S5-156394 | dCR R14 32.101-c00 Introduction of VNF in mobile networks |
draftCR revision of S5-156266 |
Ericsson |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156395 | pCR TS 28.500 Adding business level FM requirements |
pCR revision of S5-156270 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156396 | pCR TS 28.500 Adding business level CM requirements |
pCR revision of S5-156272 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156397 | pCR TS 28.500 Adding business level LCM requirements |
pCR revision of S5-156318 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156398 | pCR TS 28.500 Editorial change on terminology |
pCR revision of S5-156320 |
China Mobile Com. Corporation |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156399 | LS on service definition |
LS out LS To: SA1 revision of S5-156323 |
Huawei |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156400 | Last draft TS 28.500 | draft TS | Rapporteur(China Mobile) |
S5-104 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-156416 | Guidelines for cooperation between 3GPP TSG SA WG5 and ETSI ISG NFV | other | Ericsson Inc. |
S5-104 AI: 6.5.1.1 |
available | [WTS] [JSN] |
45 documents (0.37491106987 seconds)