Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-155028 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions |
report revised to S5-155358 |
Rapporteur |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |||
S5-155076 | Add business level PM use case and requirements | pCR | Intel Corporation (UK) Ltd | Rel-13 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155077 | Add specification level LCM use case and requirement | pCR | Intel Corporation (UK) Ltd | Rel-13 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155078 | Add specification level PM use case and requirement |
pCR revised to S5-155247 |
Intel Corporation (UK) Ltd | Rel-13 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | ||
S5-155090 | Resubmitted Reply LS from ETSI NFV to SA5 on guidelines for co-operation between 3GPP TSG SA WG5 and ETSI ISG NFV |
LS in LS reply in S5-155385 |
ETSI ISG NFV |
S5-103 AI: 6.5.1.1 |
replied to | [WTS] [JSN] | |||
S5-155092 | Discussion paper on document places for NFV use cases and requirements | discussion | Huawei | OAM14-MAMO_VNF | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | |
S5-155093 | Discussion paper on the concepts for NFV (Mobile NE, VNF, NM, DM, EM) | discussion | Huawei | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | |
S5-155094 | CR TS 32.101 Add clarification text to 3GPP concepts for NFV | CR | Huawei | 32.101 12.0.0 CR#61 catB | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] |
S5-155095 | pCR TS 28.500 Add concept information on Mobile NE and VNF |
pCR revised to S5-155292 |
Huawei | 28.5 | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] |
S5-155096 | pCR TS 28.500 Add concept information on Mobile Network Service | pCR | Huawei | 28.5 | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] |
S5-155097 | pCR TS 28.500 Adding virtualized NE alarm correlation use case |
pCR revised to S5-155248 |
Huawei | 28.5 | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] |
S5-155098 | pCR TS 28.500 Adding create virtualized NE use case |
pCR revised to S5-155249 |
Huawei | 28.5 | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] |
S5-155099 | pCR TS 28.500 Adding delete virtualized Network Element use case | pCR | Huawei | 28.5 | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] |
S5-155130 | TR 32 842 on Req GN-CON-4 |
pCR revised to S5-155281 |
Ericsson Inc. | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | ||
S5-155156 | pCR TS 28.500 Add business use case for virtualization deployment healing triggered by management system |
pCR revised to S5-155282 |
NTT DOCOMO | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | ||
S5-155157 | pCR TS 28.500 Add specification use case of virtualization deployment healing through operation request to VNFM by EM |
pCR revised to S5-155283 |
NTT DOCOMO | 28.5 0.1.0 | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |
S5-155158 | pCR TS 28.500 Add business use case of VNF instance scaling through operation request by management system |
pCR revised to S5-155284 |
NTT DOCOMO | 28.5 0.1.0 | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |
S5-155159 | pCR TS 28.500 Add specification use case of VNF instance scaling through operation request to VNFM by EM and NM |
pCR revised to S5-155285 |
NTT DOCOMO | 28.5 0.1.0 | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |
S5-155161 | pCR TS 28.500 Add business use case for notifications about VNF lifecycle changes |
pCR revised to S5-155286 |
NTT DOCOMO | 28.5 0.1.0 | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |
S5-155162 | pCR TS 28.500 Add business-level requirements related to FM and LCM |
pCR revised to S5-155287, S5-155288 |
NTT DOCOMO | 28.5 0.1.0 | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |
S5-155164 | Benefits of virtualisation are not guaranteed by 3GPP |
pCR revised to S5-155291, S5-156135 |
Ericsson LM | Rel-14 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | ||
S5-155165 | Introduction of VNFs in mobile networks | draftCR | Ericsson LM | Rel-14 |
S5-103 AI: 6.5.1.1 |
not pursued | [WTS] [JSN] | ||
S5-155172 | Producer role definition | pCR | KDDI Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
withdrawn | [WTS] [JSN] | ||
S5-155173 | Producer role definition | discussion | KDDI Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155174 | pCR TS 28.500: Management interfaces/reference points of the Management architecture | pCR | NEC EUROPE LTD |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | |||
S5-155208 | pCR TS 28.500 adding business level FM requirements | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155209 | pCR TS 28.500 adding specification level FM requirments | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155210 | pCR TS 28.500 adding general business level requirements | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155211 | pCR TS 28.500 adding business level CM requirements | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155212 | pCR TS 28.500 adding specification level CM requirements | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155213 | pCR TS 28.500 adding business level PM requirements | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155214 | pCR TS 28.500 adding specification level PM requirements | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155215 | pCR TS 28.500 adding business level LCM requirements | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
available | [WTS] [JSN] | ||
S5-155216 | pCR TS 28.500 adding specification level LCM requirements | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
available | [WTS] [JSN] | ||
S5-155226 | pCR TS 28.500 discussion sequence proposal | pCR | China Mobile Com. Corporation | Rel-14 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | ||
S5-155281 | Rel-13 CR 32 842 on Req GN-CON-4 |
CR revision of S5-155130 revised to S5-155365 |
Ericsson Inc. | 32.842 13.0.0 CR#1 catF | FS_OAM_VIRNET | Rel-13 |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] |
S5-155290 | Summary of offline discussion on the concepts for NFV (NE, VNF) | discussion | Huawei |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | |||
S5-155291 | Benefits of virtualisation are not guaranteed by 3GPP |
pCR revision of S5-155164 |
Ericsson LM |
S5-103 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-155292 | pCR TS 28.500 Add concept information on Mobile NE and VNF |
pCR revision of S5-155095 revised to S5-155364 |
Huawei | 28.5 | OAM14-MAMO_VNF-MCAR |
S5-103 AI: 6.5.1.1 |
revised | [WTS] [JSN] | |
S5-155309 | Draft TS 28.500 | draft TS | Rapporteur |
S5-103 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |||
S5-155358 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions |
report revision of S5-155028 |
Rapporteur |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] | |||
S5-155364 | pCR TS 28.500 Add concept information on Mobile NE and VNF |
pCR revision of S5-155292 |
Huawei | 28.5 | OAM14-MAMO_VNF-MCAR |
S5-103 AI: 6.5.1.1 |
approved | [WTS] [JSN] | |
S5-155365 | Rel-13 CR 32 842 on Req GN-CON-4 |
CR revision of S5-155281 |
Ericsson Inc. | 32.842 13.0.0 CR#11 catF | FS_OAM_VIRNET | Rel-13 |
S5-103 AI: 6.5.1.1 |
noted | [WTS] [JSN] |
43 documents (0.35657095909119 seconds)