Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-165023 | Minutes for Configuration Management for mobile networks that include virtualized network functions | report | Rapporteur(ZTE) |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-165098 | pCR 28.510 Add MOI deletion requirement |
pCR revised to S5-165252 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165099 | pCR 28.510 Add traceabilities of MOI configuration requirements |
pCR revised to S5-165253 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165100 | pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated | pCR | ZTE Corporation | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-165101 | draft TS 28.513 skeleton |
draft TS revised to S5-165254 |
ZTE Corporation | Rel-14 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165102 | pCR TS 28.513 Add introduction and scope | pCR | ZTE Corporation | 28.513 0.0.0 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165103 | Presentation TS 28.510 to SA for information |
TS or TR cover revised to S5-165278 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-165105 | Discussion paper- enhancement of NRM to support the VNF |
discussion revised to S5-165255 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-165151 | pCR TS 28.510 Align the usage of term on non-application | pCR | Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165152 | pCR TS 28.510 Modify use case of MO creation after VNF instantiation with VNF instance indentifier | pCR | Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-165153 | pCR TS 28.510 Adding the requirement and use case for createMO with trigger of VNF instantiation |
pCR revised to S5-165259 |
Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165154 | pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation |
pCR revised to S5-165262 |
Huawei Technologies | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165166 | pCR TS 28.510 add the relationship between VNF termination and MO deletion | pCR | Intel Corporation (UK) Ltd | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-165168 | pCR TS 28.511 add CM procedures for the VNF instantiation | pCR | Intel Corporation (UK) Ltd | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-165169 | pCR TS 28.511 add CM procedures for the VNF termination |
pCR revised to S5-165264 |
Intel Corporation (UK) Ltd | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165175 | Relation between NRM class and VNF/VNFC (implemented in VNFM) |
discussion revised to S5-165256 |
Ericsson Inc. |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-165197 | Discussion Sequence Proposal for 6.4.1.2 | other | ZTE |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-165252 | pCR 28.510 Add MOI deletion requirement |
pCR revision of S5-165098 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165253 | pCR 28.510 Add traceabilities of MOI configuration requirements |
pCR revision of S5-165099 revised to S5-165332 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165254 | draft TS 28.513 skeleton |
draft TS revision of S5-165101 |
ZTE Corporation | Rel-14 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165255 | Discussion paper- enhancement of NRM to support the VNF |
discussion revision of S5-165105 revised to S5-165335 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-165256 | Relation between NRM class and VNF/VNFC (implemented in VNFM) |
discussion revision of S5-165175 |
Ericsson Inc. |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-165257 | pCR TS 28.510 Align the usage of term on non-application | pCR | Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165258 | pCR TS 28.510 Modify use case of MO creation after VNF instantiation with VNF instance indentifier | pCR | Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165259 | pCR TS 28.510 Adding the requirement and use case for createMO with trigger of VNF instantiation |
pCR revision of S5-165153 |
Huawei Technologies | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165260 | pCR TS 28.510 add the relationship between VNF termination and MO deletion | pCR | Intel Corporation (UK) Ltd | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165261 | pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated | pCR | ZTE Corporation | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165262 | pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation |
pCR revision of S5-165154 revised to S5-165336 |
Huawei Technologies | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-165263 | pCR TS 28.511 add CM procedures for the VNF instantiation | pCR | Intel Corporation (UK) Ltd | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] | ||
S5-165264 | pCR TS 28.511 add CM procedures for the VNF termination |
pCR revision of S5-165169 |
Intel Corporation (UK) Ltd | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165278 | Presentation TS 28.510 to SA for information |
TS or TR cover revision of S5-165103 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | |||
S5-165312 | pCR TS 28.510 Rapporteur proposal | pCR | ZTE | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165332 | pCR 28.510 Add traceabilities of MOI configuration requirements |
pCR revision of S5-165253 |
ZTE Corporation | 28.51 0.5.1 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165333 | Draft TS 28.510 | draft TS | ZTE | Rel-14 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165334 | Draft TS 28.513 | draft TS | ZTE | Rel-14 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165335 | Discussion paper- enhancement of NRM to support the VNF |
discussion revision of S5-165255 |
ZTE Corporation |
S5-109 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-165336 | pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation |
pCR revision of S5-165262 |
Huawei Technologies | 28.511 0.3.0 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-165367 | Draft TS 28.511 | draft TS | ZTE | Rel-14 |
S5-109 AI: 6.4.1.2 |
approved | [WTS] [JSN] |
38 documents (0.37668204307556 seconds)