Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-164023 | Minutes for Configuration Management for mobile networks that include virtualized network functions | report | Rapporteur(ZTE) |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-164037 | TS 28.510 Add UC NM retrieves VNFs info maintained by mgmt sys |
pCR revised to S5-164176 |
Ericsson Inc. | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164069 | Draft TS 28.512 skeleton |
draft TS revised to S5-164177 |
ZTE Corporation | Rel-14 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164070 | pCR TS 28.512 Add introduction and scope | pCR | ZTE Corporation | 28.512 0.1.0 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164071 | pCR TS 28.512 Add description of Itf-N operation | pCR | ZTE Corporation | 28.512 0.1.0 |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-164072 | pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated | pCR | ZTE Corporation | 28.511 0.4.0 |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-164073 | pCR draft TS 28.511 Add procedure of deleting MOI(s) corresponding to a VNF instance | pCR | ZTE Corporation | 28.511 0.4.0 |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-164089 | Correlation of MO creation and VNF instantiation |
discussion revised to S5-164178 |
Huawei Tech.(UK) Co., Ltd |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-164090 | pCR TS 28.511 Adding procedure flow for VNF instantiation triggered by MO creation | pCR | Huawei Tech.(UK) Co., Ltd | 28.511 0.4.0 |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | ||
S5-164093 | pCR TS 28.510 Adding specification UC and reqs on modification of VNF instance non-applicatoin configuration through NFVO as part of NS update |
pCR revised to S5-164203 |
NTT DOCOMO | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164138 | Relation between create MO and instantiate VNF operations | other | Ericsson Inc. | Rel-14 |
S5-108 AI: 6.4.1.2 |
merged | [WTS] [JSN] | ||
S5-164139 | UCs (on VNF/VNFC realization) requiring NRM support |
other revised to S5-164204 |
Ericsson Inc. | Rel-14 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164166 | Discussion sequence proposal | discussion | ZTE |
S5-108 AI: 6.4.1.2 |
noted | [WTS] [JSN] | |||
S5-164176 | TS 28.510 Add UC NM retrieves VNFs info maintained by mgmt sys |
pCR revision of S5-164037 revised to S5-164261 |
Ericsson Inc. | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164177 | Draft TS 28.512 skeleton |
draft TS revision of S5-164069 |
ZTE Corporation | Rel-14 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164178 | Correlation of MO creation and VNF instantiation |
discussion revision of S5-164089 revised to S5-164202 |
Huawei Tech.(UK) Co., Ltd |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-164202 | Correlation of MO creation and VNF instantiation |
discussion revision of S5-164178 revised to S5-164223 |
Huawei Tech.(UK) Co., Ltd |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | |||
S5-164203 | pCR TS 28.510 Adding specification UC and reqs on modification of VNF instance non-applicatoin configuration through NFVO as part of NS update |
pCR revision of S5-164093 revised to S5-164263 |
NTT DOCOMO | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164204 | UCs (on VNF/VNFC realization) requiring NRM support |
other revision of S5-164139 revised to S5-164264 |
Ericsson Inc. | Rel-14 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164223 | Potential use cases for relationship between MO creation and VNF instantiation |
pCR revision of S5-164202 revised to S5-164262 |
Huawei Tech.(UK) Co., Ltd,Ericsson,Nokia | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164261 | TS 28.510 Add UC NM retrieves VNFs info maintained by mgmt sys |
pCR revision of S5-164176 revised to S5-164294 |
Ericsson Inc. | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
revised | [WTS] [JSN] | ||
S5-164262 | Potential use cases for relationship between MO creation and VNF instantiation |
pCR revision of S5-164223 |
Huawei Tech.(UK) Co., Ltd,Ericsson,Nokia | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164263 | pCR TS 28.510 Adding specification UC and reqs on modification of VNF instance non-applicatoin configuration through NFVO as part of NS update |
pCR revision of S5-164203 |
NTT DOCOMO | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164264 | UCs (on VNF/VNFC realization) requiring NRM support |
discussion revision of S5-164204 |
Ericsson Inc. | Rel-14 |
S5-108 AI: 6.4.1.2 |
endorsed | [WTS] [JSN] | ||
S5-164266 | Draft TS 28.510 | draft TS | Rapprteur(ZTE) | Rel-14 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164267 | Draft TS 28.512 | draft TS | Rapporteur(ZTE) | Rel-14 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] | ||
S5-164294 | TS 28.510 Add UC NM retrieves VNFs info maintained by mgmt sys |
pCR revision of S5-164261 |
Ericsson Inc. | 28.51 0.5.0 |
S5-108 AI: 6.4.1.2 |
approved | [WTS] [JSN] |
27 documents (0.35992789268494 seconds)