Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-165022 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions | report | Rapporteur(China Mobile) |
S5-109 AI: 6.4.1.1 |
noted | [WTS] [JSN] | |||
S5-165110 | pCR TS 28.500 Consistency edits and clarifications |
pCR revised to S5-165244 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165111 | pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship |
pCR revised to S5-165245 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165112 | pCR TS 28.500 Aligning requirements and traceability on FM virtualization-specific use case | pCR | NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165113 | pCR TS 28.500 Aligning requirements and traceability on certain LCM use cases |
pCR revised to S5-165247 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165116 | pCR TS 28.500 UC and requirements on automating different types of configuration | pCR | NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
noted | [WTS] [JSN] | ||
S5-165119 | pCR TS 28.500 Updating the NE and VNF concept |
pCR revised to S5-165246 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165120 | pCR TS 28.500 Adding the PM collection use case |
pCR revised to S5-165250 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165121 | Discussion TS 28.500 the collection machenism of VNF PM data related to virtualized resource | discussion | China Mobile Com. Corporation | Rel-14 |
S5-109 AI: 6.4.1.1 |
noted | [WTS] [JSN] | ||
S5-165122 | Revised WID Management concept, architecture and requirements for mobile networks that include virtualized network functions |
WID revised revised to S5-165373 |
China Mobile Com. Corporation | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | |
S5-165150 | pCR TS 28.500 Align the usage of term on non-application | pCR | Huawei Technologies | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165200 | Informal presentation of draft LS NFV(16)000252 - LS OUT to 3GPP SA5 informing about update to application view in IFA015 | other | Nokia Networks |
S5-109 AI: 6.4.1.1 |
noted | [WTS] [JSN] | |||
S5-165244 | pCR TS 28.500 Consistency edits and clarifications |
pCR revision of S5-165110 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165245 | pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship |
pCR revision of S5-165111 revised to S5-165325 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165246 | pCR TS 28.500 Updating the NE and VNF concept |
pCR revision of S5-165119 revised to S5-165326 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165247 | pCR TS 28.500 Aligning requirements and traceability on certain LCM use cases |
pCR revision of S5-165113 |
NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165248 | pCR TS 28.500 UC and requirements on automating different types of configuration | pCR | NTT DOCOMO | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] | ||
S5-165250 | pCR TS 28.500 Adding the PM collection use case |
pCR revision of S5-165120 revised to S5-165331 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
revised | [WTS] [JSN] | ||
S5-165251 | pCR TS 28.500 Align the usage of term on non-application | pCR | Huawei Technologies | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] | ||
S5-165271 | pCR 28.500-110 update based on the reviews from edithelp | pCR | China Mobile | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165275 | Addressing EditHelp's comments | pCR | China Mobile | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] | ||
S5-165325 | pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship |
pCR revision of S5-165245 |
NTT DOCOMO,China Mobile | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165326 | pCR TS 28.500 Updating the NE and VNF concept |
pCR revision of S5-165246 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165327 | new draft TS 28.500 | draft TS | China Mobile | Rel-14 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165331 | pCR TS 28.500 Adding the PM collection use case |
pCR revision of S5-165250 |
China Mobile Com. Corporation | 28.5 1.1.1 |
S5-109 AI: 6.4.1.1 |
approved | [WTS] [JSN] | ||
S5-165373 | Revised WID Management concept, architecture and requirements for mobile networks that include virtualized network functions |
WID revised revision of S5-165122 |
China Mobile Com. Corporation | OAM14-MAMO_VNF-MCAR | Rel-14 |
S5-109 AI: 6.4.1.1 |
agreed | [WTS] [JSN] |
26 documents (0.37779688835144 seconds)