Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R3-152448 | Correction of dynamic coverage configuration changes | draftCR | Samsung, ZTE | UTRA_LTE_SON_AAS | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152503 | Enhancement on Resource Status Reporting | discussion | Huawei | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152504 | Enhancement on Resource Status Reporting | CR | Huawei | 36.423 13.1.0 CR#933 catC | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
not pursued | [WTS] [JSN] |
R3-152514 | X2 removal enhancements | discussion | Huawei | TEI13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | ||
R3-152515 | Addition of a waiting time for X2 removal |
CR revised to R3-160282 |
Huawei | 36.423 13.1.0 CR#934 catC | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
not pursued | [WTS] [JSN] |
R3-152543 | Correction of M2AP PMCH Configuration | discussion | Alcatel-Lucent | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | ||
R3-152544 | Correction of PMCH Configuration |
CR revision of R3-152135 |
Alcatel-Lucent | 36.443 13.1.0 CR#1122 catF | TEI12, LTE_SC_enh_L1 | Rel-13 |
R3-90 AI: 31.2 |
not pursued | [WTS] [JSN] |
R3-152554 | Deficiencies of MRO failure analysis | discussion | Nokia Networks | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152555 | On local resolution of handover criteria | discussion | Nokia Networks | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152556 | [DRAFT] LS on possible improvements in the RLF Reporting (To: RAN2) |
LS out LS To: RAN2 |
Nokia Networks | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
available | [WTS] [JSN] | |
R3-152557 | Implementation of the way forward solution for the SON for AAS | discussion | Nokia Networks | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152558 | Addition of the Cell Deployment Status Indicator and replacing cell information |
CR revised to R3-152845 |
Nokia Networks | 36.423 13.1.0 CR#936 catB | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
revised | [WTS] [JSN] |
R3-152559 | Addition of the information on the notification for planned reconfiguration |
pCR revised to R3-152846 |
Nokia Networks | 36.3 13.1.0 | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
revised | [WTS] [JSN] |
R3-152572 | Enhancement to the X2 Removal procedure |
discussion revised to R3-152757 |
Nokia Networks, DTAG, Orange, TeliaSonera |
R3-90 AI: 31.2 |
revised | [WTS] [JSN] | |||
R3-152573 | Enhancement to the X2 Removal procedure |
CR revised to R3-152886 |
Nokia Networks, DTAG, Orange, TeliaSonera | 36.3 13.1.0 | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
revised | [WTS] [JSN] |
R3-152574 | Enhancement to the X2 Removal procedure |
CR revised to R3-152887 |
Nokia Networks, DTAG, Orange, TeliaSonera | 36.423 13.1.0 CR#937 catC | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
revised | [WTS] [JSN] |
R3-152592 | X2 removal issue in the X2 GW deployment | discussion | ZTE Corporation |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |||
R3-152602 | Discussion on the X2 Removal | other | NEC | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | ||
R3-152615 | Discussion on how to capture the way forward of SON for AAS in stage 3 | discussion | Samsung, ZTE | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | ||
R3-152616 | Reestablishment support for AAS reconfiguration | CR | Samsung, ZTE | 36.423 13.1.0 CR#942 catB | UTRA_LTE_SON_AAS | Rel-13 |
R3-90 AI: 31.2 |
not pursued | [WTS] [JSN] |
R3-152617 | Reestablishment support for AAS reconfiguration | draftCR | Samsung, ZTE | UTRA_LTE_SON_AAS | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152650 | Idle mode load balancing for signalling only RRC connections |
discussion revision of R3-152036 revised to R3-160211 |
Nokia Networks |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |||
R3-152651 | Introduction of support for Idle Mode Load Balancing for signalling only RRC connections |
CR revision of R3-152037 revised to R3-152829 |
Nokia Networks | 36.413 13.0.0 CR#13541 catC | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
revised | [WTS] [JSN] |
R3-152653 | UE context removal at UE power off |
CR revision of R3-152130 revised to R3-160375 |
Ericsson | 36.413 13.0.0 CR#13133 catB | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
not pursued | [WTS] [JSN] |
R3-152654 | Compensation of propagation delays in Radio Interface Based Synchronisation |
CR revision of R3-152337 revised to R3-152767 |
Ericsson, China Unicom, CMCC | 36.413 13.0.0 CR#13145 catB | TEI13, LTE_SC_enh_L1-Core | Rel-13 |
R3-90 AI: 31.2 |
revised | [WTS] [JSN] |
R3-152695 | Discussion on UE power off | discussion | Ericsson | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152696 | Propagation delay solution for Radio Interface Based Synchronisation |
discussion revised to R3-152766 |
Ericsson, China Unicom, CMCC | LTE_SC_enh_L1-Core | Rel-13 |
R3-90 AI: 31.2 |
revised | [WTS] [JSN] | |
R3-152697 | Enhancements to Resource Status Request procedure | discussion | Ericsson | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152698 | Enhancements for partial stop and resume of information reporting | CR | Ericsson | 36.423 13.1.0 CR#944 catB | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
not pursued | [WTS] [JSN] |
R3-152699 | Reusing Available WLAN Measurements to Enhance E-CID | draftCR | Ericsson | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152700 | Reusing Available WLAN Measurements to Enhance E-CID in LPPa | CR | Ericsson | 36.455 12.2.0 CR#53 catC | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
not pursued | [WTS] [JSN] |
R3-152732 | Alternatives for propagation delay compensation | discussion | Alcatel-Lucent |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |||
R3-152740 | S1AP Cause values for RAN parameter threshold management | discussion | Kyocera Corporation | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | ||
R3-152741 | S1AP Cause values for E-RAB setup and release due to traffic steering | CR | Kyocera Corporation | 36.413 13.0.0 CR#1375 catC | Rel-13 |
R3-90 AI: 31.2 |
not pursued | [WTS] [JSN] | |
R3-152742 | Response to R3-152697 and R3-152503 | response | Nokia Networks | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152743 | Response to R3-152572 | response | Ericsson | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152757 | Enhancement to the X2 Removal procedure |
discussion revision of R3-152572 |
Nokia Networks, CMCC, DTAG, Orange, Telecom Italia,TeliaSonera |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |||
R3-152766 | Propagation delay solution for Radio Interface Based Synchronisation |
discussion revision of R3-152696 |
Ericsson, China Unicom, CMCC, Qualcomm, AT&T | LTE_SC_enh_L1-Core | Rel-13 |
R3-90 AI: 31.2 |
noted | [WTS] [JSN] | |
R3-152767 | Compensation of propagation delays in Radio Interface Based Synchronisation |
CR revision of R3-152654 |
Ericsson, China Unicom, CMCC, Qualcomm, AT&T | 36.413 13.0.0 CR#13146 catB | TEI13, LTE_SC_enh_L1-Core | Rel-13 |
R3-90 AI: 31.2 |
not pursued | [WTS] [JSN] |
R3-152829 | Introduction of support for Idle Mode Load Balancing for signalling only RRC connections |
CR revision of R3-152651 revised to R3-160212 |
Nokia Networks, Huawei, TeliaSonera | 36.413 13.0.0 CR#13542 catC | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
postponed | [WTS] [JSN] |
R3-152845 | Addition of the Cell Deployment Status Indicator and replacing cell information |
CR revision of R3-152558 revised to R3-152912 |
Nokia Networks | 36.423 13.1.0 CR#9361 catB | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
revised | [WTS] [JSN] |
R3-152846 | Addition of the information on the notification for planned reconfiguration |
draftCR revision of R3-152559 |
Nokia Networks | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
endorsed | [WTS] [JSN] | |
R3-152886 | Enhancement to the X2 Removal procedure |
draftCR revision of R3-152573 revised to R3-160188 |
Nokia Networks, DTAG, Orange, TeliaSonera | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
postponed | [WTS] [JSN] | |
R3-152887 | Enhancement to the X2 Removal procedure |
CR revision of R3-152574 revised to R3-160189 |
Nokia Networks, DTAG, Orange, TeliaSonera | 36.423 13.1.0 CR#9371 catC | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
postponed | [WTS] [JSN] |
R3-152912 | Addition of the Cell Deployment Status Indicator and replacing cell information |
CR revision of R3-152845 |
Nokia Networks | 36.423 13.1.0 CR#9362 catB | TEI13 | Rel-13 |
R3-90 AI: 31.2 |
agreed | [WTS] [JSN] |
45 documents (0.35743093490601 seconds)