3GPP 21.900 v20.0.0 — the document's own text
8.5 Timing
Taught in 8. How a 3GPP meeting decides, and the word it decides in (How standards actually get made, in depth), 6. Two ways of deciding (How standards actually get made, overview).
Email decision procedure should start at the latest 3 weeks before relevant plenary:
- the email decision period is two weeks (one status report required);
- the procedure shall be completed one week before the relevant TSG, WG or SWG plenary, due to practical arrangements.