Satellites — a base station in orbit · Overview
Every question of this course
All 35 questions on one page, in the order the chapters come. Pick an answer and it tells you at once whether you were right and where the answer lives.
1 What a non-terrestrial network is
Q1.1 In TS 38.108's own words, what is a Satellite Access Node?
The definition says the node provides NR user plane and control plane protocol terminations towards the phone and encompasses a transparent payload on board an NTN platform, with satellite-gateway and gNB functions. It is not one box in one place. "Satellite Access Node" as 38.108 defines it
Q1.2 What is the difference between a transparent payload and a regenerative one?
TR 38.863 defines the transparent payload as changing the frequency carrier, filtering and amplifying. TR 38.742 defines the regenerative one as transforming the signal, and that transformation is digital processing. "Regenerative payload" as 38.742 defines it
Q1.3 Which of these is the feeder link?
TS 38.108 defines the feeder link as the wireless link between satellite-gateway and satellite. The satellite-to-phone hop is the service link. "feeder link" as 38.108 defines it
Q1.4 TR 23.700-19 defines phone-to-satellite-to-phone traffic. What makes it different?
The definition is communication between devices under the coverage of one or more serving satellites, using satellite access, without the user traffic transiting through the ground segment. "UE-Satellite-UE Communication" as 23.700-19 defines it
Q1.5 How high is a geostationary orbit, in the words of TS 38.108?
The definition is a circular orbit at 35,786 km above the Earth's equator, following the direction of the Earth's rotation, so the object appears motionless to somebody standing on the ground. "Geostationary Earth Orbit" as 38.108 defines it
2 Why anyone wanted it
Q2.1 What reason does the Release 17 internet-of-things work item give for itself?
The justification opens by saying IoT operation is critical in remote areas with low or no cellular connectivity for many industries, and the first it names is transportation and logistics. why LTE_NBIOT_eMTC_NTN was proposed
Q2.2 What does the Release 18 justification say Release 17 had assumed?
The justification restates the Release 17 scope in one sentence, and every one of those four limits is in it. Release 18 exists to widen them. why NR_NTN_enh-Core was proposed
Q2.3 Why does the Ku band work item say it is bringing that band into 3GPP?
The justification says the Ku band is allocated for primary satellite use for ITU regions 1, 2 and 3, and that the work therefore introduces it into the specifications according to those definitions. why NR_NTN_Ku_bands-Core was proposed
Q2.4 What does the time-division mode for the internet-of-things radio say it is for?
The proposal describes using radio resources in a periodic subset of the uplink and downlink subframes, thus limiting power consumption, and says the feature extends operation to an additional non-geosynchronous satellite system. why IoT_NTN_TDD-Core was proposed
Q2.5 How many of the 155 short names in this subject carry a quoted objective or justification?
The register quotes the objective and usually the justification of the 41 acronyms carrying at least 200 documents. For the other 114 a chapter may say what the work plan calls them and nothing about what they promised. 155 Satellites work item acronyms
3 How the work is cut up, and who carries it
Q3.1 A radio feature in the work plan usually appears under more than one short name. Which split is it?
The register carries each part as its own acronym, ending -Core, -Perf and -UEConTest, and each sits on its own work plan row. 183 Satellites rows in the work plan
Q3.2 Somebody says "there are 155 satellite work items". What is missing from that?
The 155 short names sit on 183 rows, because some names appear on more than one row. A count of this work has to say which of the two it means. 155 Satellites work item acronyms
Q3.3 Which release carries the most work plan rows of this subject?
58 rows are planned for Release 19, against 47 for Release 18 and 41 for Release 20. Release 17 carries 23. Rel-19
Q3.4 Which group carries more documents of this subject than any other?
RAN4 carries 7490 of these documents over 34 of its meetings, more than any other group code in this register. SA2 is the largest outside RAN. RAN4
Q3.5 What is on the record for the Release 8 row in this subject?
The Release 8 row is a stage 1 row for positioning by satellite navigation. It carries no documents and the work plan names no document that describes it. ANSS
4 The radio half, release by release
Q4.1 Which short name carries more documents than any other in this register?
4346 documents carry NR_NTN_solutions-Core, the largest of the 155 short names here. The first study carries 124, which is the shape of a subject nobody had committed to yet. 4346 documents carrying the work item NR_NTN_solutions-Core
Q4.2 What did the Release 15 and Release 16 radio studies produce?
The Release 15 study produced TR 38.811 and the Release 16 solutions study produced TR 38.821. Neither is a specification; both are homework the rule-writing then rested on. FS_NR_NTN_solutions
Q4.3 Why does one Release 17 satellite work item sit in CT and SA rather than in RAN?
IoT_SAT_ARCH_EPS is architecture support for NB-IoT and eMTC non-terrestrial networks in the evolved packet system. Its leadership line names SA2, and its documents sit at CT and SA meetings. IoT_SAT_ARCH_EPS
Q4.4 What does the Release 20 study report TR 38.742 say it is about?
Its scope says it studies resilient operation targeting Release 20 enhancements, and evaluates solutions for scenarios where the navigation signal is temporarily unavailable while service is maintained. the scope of 38.742
Q4.5 What is the objective of the Release 17 internet-of-things satellite work item?
The objective really is that short. The work started on both radios at the August 2021 meetings, and the report behind it is TR 36.763. the objective of LTE_NBIOT_eMTC_NTN
5 The system half: 5GSAT, phase by phase
Q5.1 What marks a piece of this work as belonging to the system half rather than the radio half?
The register labels no halves. The split shows in the short names and in the leadership line each work item carries, and that line is what any claim about who led what is read from. 5GSAT_ARCH-CT
Q5.2 What is phase 2 of the 5GSAT line about?
Its work item says it specifies changes to the 5G core and the older 4G core to support satellite discontinuous coverage. the objective of 5GSAT_Ph2
Q5.3 Which three things does the phase 3 protocol work item name in its own justification?
Those are the three key issues its justification names, studied by SA2 and written up in TR 23.700-29. why 5GSAT_Ph3_ARCH was proposed
Q5.4 What is satellite backhaul, as against satellite access?
Backhaul runs the other way round. Nothing reaches the phone from orbit; the satellite sits behind a normal mast, on the way back to the operator's network. the objective of 5GSATB
Q5.5 What is the first work task of the phase 4 architecture study?
The study's objective names it as work task 1 — an IMS voice call over GEO via NB-IoT NTN connecting to EPC. the objective of FS_5GSAT_Ph4_ARC
6 What is on the shelf, and why the bands weigh so much
Q6.1 What does TS 38.108 cover?
Its scope says it establishes the minimum RF characteristics and minimum performance requirements of NR and NB-IoT operation in an NTN NR in-band Satellite Access Node. the scope of 38.108
Q6.2 Which document carries the most documents of this subject?
TS 38.133 carries 1426 documents of this subject, 1306 of them change requests, which is more than any other specification in this register. TS 38.133
Q6.3 Why does RAN4 carry more documents of this subject than any other group?
Each band item names RAN WG4 as its leading group, is split into a core part and usually a performance part, and names the same handful of documents over again. RAN4
Q6.4 What is the difference between the 102 specifications in this register and the 3599 in the catalogue?
They answer different questions. One is a count of what this subject touches, the other a count of the whole active catalogue. 102 specifications this work touches
Q6.5 What did the Ku band work item give as its reason?
Its justification says the Ku band is allocated for primary satellite use for ITU regions 1, 2 and 3, so the work introduces it into 3GPP's specifications. why NR_NTN_Ku_bands-Core was proposed
7 Where it stands, how to follow it, and what the record cannot say
Q7.1 What does the work plan give you about how far a piece of work has got?
There is no status field. The row carries planned days and a completion value, so every sentence about progress here is built from those two or it is invented. 116 of the acronyms carry a completion value of 1
Q7.2 Which part of Release 19's radio work is clearly not done?
The core and performance parts both stand at 1. The conformance part, which is RAN5's, stands at 0.14 and is planned to finish in 2027. NR_NTN_Ph3-UEConTest
Q7.3 6568 documents name satellites or NTN in their title and carry no work item short name. What does that mean for every count in this course?
Everything here was filtered by work item short name, so those 6568 are in none of the numbers — including plenary approval papers and anything filed before a work item existed. 6568 documents name satellites or NTN in their title and carry no work item
Q7.4 One work plan row has the word STOPPED at the front of its own title. What is that word?
The plan has no status field at all. That word is inside the title somebody typed, which is why no other row can be read the same way. NR_NTN_combinedLband-Perf
Q7.5 Which of these can this record tell you?
The register holds work plan rows, meeting codes, version numbers, planned days and counts. It holds no release date and no reason for any decision. RP-261568