IMS — the call as an internet session · In depth
Every question of this course
All 69 questions on one page, in the order the chapters come. Pick an answer and it tells you at once whether you were right and where the answer lives.
1 What IMS is, in the words of its own documents
Q1.1 Which document defines the stage 2 service description of IMS?
TS 23.228 says of itself that it defines the stage-2 service description for the IP Multimedia Core Network Subsystem. TS 24.229 is the protocol and TS 22.228 the requirements. the scope of 23.228
Q1.2 What does TS 24.229 define?
Its own scope says it defines a call control protocol for use in the IM CN subsystem based on the Session Initiation Protocol and the associated Session Description Protocol. the scope of 24.229
Q1.3 In the definitions clause of TS 22.228, what is an IP multimedia service?
The document keeps three words apart. A session is senders, receivers and streams; an application handles the media types; a service is the experience one or more applications provide. "IP multimedia service" as 22.228 defines it
Q1.4 What is a data channel application, as TS 23.228 defines it?
The definition is literally a web page. It is downloaded to the device over the bootstrap data channel, and may also carry images and style sheets. "Data channel application" as 23.228 defines it
Q1.5 What can this course tell you about how an IMS session is actually set up?
The register holds titles, scopes, definitions, objectives and counts. Anything about how the system works has to be read in the specifications themselves. the scope of 23.228
2 How this subject is cut out of the work plan
Q2.1 What decides whether a work plan row belongs to this course?
The rule is applied to the acronym alone. Titles are never tested, because several real IMS work items have the letters nowhere in their names. 345 rows of the 3GPP work plan are IMS work
Q2.2 How many rows and how many acronyms does that rule take in?
One acronym often has several rows, because a row is one group's share of one work item. So the two counts answer different questions and neither is the number of work items a person would name. 177 different work item acronyms carry IMS
Q2.3 Why does the rule allow a lower-case letter in front of the three letters?
A boundary that also forbade a lower-case letter would leave 163 acronyms and throw out eIMS5G_SBA, eIMS_RP, enIMS and FS_enIMS_ARC, which are real IMS work. 163 of those acronyms survive a boundary that also forbids a lower-case letter
Q2.4 What is true of every document count in this course?
A document is counted only when its work item column names one of the 177 acronyms, and no IMS document earlier than 2015-01-23 carries an acronym in this store at all. the earliest IMS document on record went up on 2015-01-23
Q2.5 What may a chapter say about a work item with no quotable description?
For 20 of the 177 acronyms the folder holds no description that proves it belongs to that row. IMS2 is one of them, so nothing may be written about what IMS phase 2 promised. 157 of the 177 IMS acronyms have a work item description on this machine
3 Release 5: the founding, and the ring of work around it
Q3.1 What is the title of the founding IMS row in the work plan?
The row's acronym is bare IMS and its title is "Provisioning of IP-based multimedia services". The third option is the title of the description document behind it, which is a different thing. IMS
Q3.2 In its own words, what was the objective of that first work item?
The objective is stage 1 work — concepts, requirements and features — and it adds that IP multimedia services shall support multiple media components per call. what IMS set out to do
Q3.3 What may this course say about when meeting SP-8 was held?
SP-8 is one of four meetings named here for which the store holds no days and no place. The meeting may be named and never dated. SP-000216
Q3.4 Why is the Rel-5 document count not a measure of how much work was done?
The founding row has one document against its name. That is a fact about when the store began labelling documents, not about the work. the earliest IMS document on record went up on 2015-01-23
Q3.5 What does the "100%" on a work plan row tell you?
339 of the 345 IMS rows stand at 100%. It is a completion percentage maintained by hand, and no field anywhere says whether a work item is running, stopped or finished. 339 of the 345 IMS work plan rows stand at 100%
4 Releases 6 and 7: interworking, messaging, and a stream that never stopped
Q4.1 What did IMS-CCR-IWCS set out to do?
Its objective is one sentence, and "basic voice calls" is the whole ambition of it. Its justification names the PSTN, ISDN and the GSM and UMTS circuit networks as what had to be reached. what IMS-CCR-IWCS set out to do
Q4.2 How many work plan rows did the paper SP-020065 open?
One plenary paper can define several rows at once. The store lists all five work items against that document number. SP-020065
Q4.3 What may this course say about what IMS phase 2 promised?
IMS2 is one of the 20 acronyms with no quotable work item description, so nothing may be written about what it said it would do. Its row, its release and its groups are all the register holds. IMS2
Q4.4 What is IMSProtoc, opened in Rel-7?
It is the first of a numbered chain that has been reopened in release after release, which is why its phase 2 alone carries 248 documents. IMSProtoc
5 Releases 8 and 9: emergency calls, continuity and the fixed-network merge
Q5.1 Which release carries the most IMS work plan rows?
Rel-8 at 64 leads, Rel-12 at 60 is second and Rel-9 at 45 is third. Any ranking here is over the 345 rows this register takes in, and says nothing about 3GPP work outside it. 64 IMS work plan rows are marked Rel-8
Q5.2 Why was IMS_EMER_GPRS_EPS opened?
Its justification names regional regulatory requirements and staying competitive with other wireless packet technologies, and its objective is the requirements for emergency calls over GERAN, UTRAN and E-UTRAN. why IMS_EMER_GPRS_EPS was proposed
Q5.3 What did eIMS_RP exist to finish?
Rel-8 specified restoration for S-CSCF service interruption in TS 23.380. The P-CSCF procedures studied in TR 23.820 were not finished in that timeframe, and this work item was opened to complete them. why eIMS_RP was proposed
Q5.4 How does the register describe IMS Service Continuity, in TS 23.237's own scope?
The scope is one sentence and it is deliberately narrow. What continuity is *for* comes from the work item that opened it, not from the specification's own scope. the scope of 23.237
Q5.5 What is the "common IMS" in the TISPAN maintenance rows?
The rows are titled "Maintenance of TISPAN release 1 common IMS" and "Documentation of TISPAN NGN R1 and R2 in 3GPP SA WG2", and the specifications they target carry TISPAN in their own titles. IMS_Comm_Mtce8
6 Releases 10 to 14: the browser, telepresence and the middle years
Q6.1 What did IMS_WebRTC say it would specify?
Its objective is service requirements for the ability for WebRTC clients to access IMS, reusing IMS client security credentials and public identities where that made sense. what IMS_WebRTC set out to do
Q6.2 The work plan holds 60 IMS rows for Rel-12 and 15 for Rel-13. What does that pair of numbers tell you about how much work was done?
Rel-12 has 60 rows and 433 documents; Rel-13 has 15 rows and 830. Rows count bookkeeping entries, documents count paper, and neither measures effort. 15 IMS work plan rows are marked Rel-13
Q6.3 Which specification is the stage 3 protocol for WebRTC access to IMS?
TS 24.371 is "WebRTC access to the IM CN subsystem; Stage 3; Protocol specification", owned by CT1, with 160 IMS documents against it. TS 24.371
Q6.4 Six Rel-12 acronyms for registration control carry no documents at all. What else do they have in common?
All six IMS_RegCon rows are titled "Deleted - …". That prefix is typed into the title by hand; the work plan carries no status field, and the register holds no vote of any kind. 22 IMS work item acronyms carry the word Deleted at the front of their own name
Q6.5 What is IMSProtoc, in one line?
Phases 4 to 8 fall inside these five releases alone, with 19, 248, 209, 364 and 169 documents against them. 364 documents carry the work item IMSProtoc7
7 Releases 15 to 17: IMS moves onto the 5G core
Q7.1 Why was IMS work needed at all when the 5G core was specified?
The Rel-15 work item's justification says exactly that, and calls the 5G core a new type of IP connectivity for reaching IMS. why 5GS_Ph1-IMSo5G was proposed
Q7.2 What did the Rel-16 study give as the reason it was needed?
Its justification says the scope was intentionally limited to avoid major IMS re-specification that might delay initial 5GC specification. why FS_eIMS5G was proposed
Q7.3 Which acronym has more documents against it than any other in this register?
543 documents name eIMS5G_SBA, ahead of 5GS_Ph1-IMSo5G's 476. It is a count over this register and says nothing about 3GPP as a whole. 543 documents carry the work item eIMS5G_SBA
Q7.4 Why was a second phase of the enhanced-IMS-to-5GC study opened in Rel-17?
The second study's own justification names those four key issues as unfinished, while saying the service-based conclusions had been reached. why FS_eIMS5G2 was proposed
Q7.5 What is TR 23.794 in this course?
It is the Rel-16 study report with 190 IMS documents against it, and this machine holds no parsed text of it, so no clause of it may be cited. TR 23.794
8 The map: fourteen groups, 309 meetings and 374 names
Q8.1 The three largest document counts in this record belong to which family of groups?
CT1 with 2169, CT4 with 746 and CT3 with 719 lead the record. IMS is a core-network subject and the shape of the counts says so. CT1
Q8.2 How many separate meetings have had an IMS document on the table?
309 meetings. 374 is the number of different names that appear as a writer, and 4939 is the document count. 309 meetings have had IMS documents on the table
Q8.3 Ericsson appears with 602 documents and "Ericsson / Nevenka" with 130. What may you do with those two numbers?
The count is grouped by the name each document spelled. Two spellings count twice, and this register never joins them. Ericsson / Nevenka filed 130 IMS documents
Q8.4 RAN2 has exactly one IMS document in this record. What can you say about it?
The register records the acronym and the meeting. It does not record what kind of document it is, so calling it a change request, a liaison or RAN2's own work would be an invention. RAN2
Q8.5 What do the plenary rows — CT with 221, SA with 34, RAN with 25 — mostly carry?
Working groups write the text and plenaries approve the work. The plenary counts are small next to CT1's 2169 and that is the normal shape. CT
9 CT1, CT3, CT4 and CT6: where most of it happens
Q9.1 Which meeting handled more IMS documents than any other in this record?
206 IMS documents at C1-112, ahead of C1-90's 159. It is a count over the IMS documents in this register and nothing wider. C1-112 handled 206 IMS documents, more than any other single meeting
Q9.2 How many IMS documents in this record name TS 24.229 as the document they change?
1680, of which 1675 are a change request, a change-request pack or a draft change request. It is the largest target in the register by a long way. 1680 IMS documents name 24.229 as the document they change
Q9.3 Both IMS restoration studies belong to which group?
TR 29.866, the disaster prevention and restoration study, and TR 29.867, the resiliency study, are both owned by CT4. TR 29.866
Q9.4 A meeting entry in this register carries days and a place. What does it not always carry?
The attendance store reaches back only a little way. Four older meetings named elsewhere in this register have no row at all, so they can be named and not dated. C1-112
Q9.5 What does CT3 own that the other CT groups do not?
CT3's subject is interworking with other networks, and those two documents carry 228 and 190 IMS documents against them. TS 29.163
10 SA1 to SA5, the two RAN groups, and the plenaries above them
Q10.1 Which group owns TS 23.228, the stage 2 description of IMS?
SA2 is the architecture group. It owns TS 23.228 and carries 429 IMS documents over 30 meetings in this record. TS 23.228
Q10.2 What does SA4 do in this subject?
186 documents, and the acronyms named against it are the two telepresence media items, split rendering and the AI/ML media item. SA4
Q10.3 RAN5 has 147 IMS documents. What is it doing with them?
RAN5 is the mobile terminal conformance testing group. Its four acronyms here are all test items, two of them for the IMS data channel. RAN5
Q10.4 How many IMS documents in this record are of the type "LS out", a letter sent to another group?
45 documents carry that type. The register gives an entry of its own to fifteen of them, the ones whose outcome word is approved or agreed. 45 IMS documents are of type LS out
Q10.5 The plenaries carry CT 221, SA 34 and RAN 25 IMS documents. Why so few?
The CT plenary alone shows 44 meetings for its 221 documents — a few papers at a great many meetings, which is what deciding looks like. CT
11 The specification family: 241 documents, and the two that are IMS
Q11.1 How does a document get onto this course's list of 241 specifications?
Those are the two tests, and a document passes if either is true. One catches what was promised, the other catches what actually landed. 241 specifications this work touches
Q11.2 Which document carries by far the most IMS change traffic?
1680 of the 4939 IMS documents in this record name TS 24.229 as the document they change. TS 23.228 is named by 92. 1680 IMS documents name 24.229 as the document they change
Q11.3 A stored version carries a date. What is that date?
The register says so in the entry itself. Publication day and approval day are not held anywhere on this machine. TS 23.228
Q11.4 72 of the 241 specifications have no parsed text on this machine. What may a course do with them?
No parsed text means no words to check a quotation against. Naming and counting are safe; quoting is not. 241 specifications this work touches
Q11.5 TR 23.794 and TS 23.228 are different kinds of document. What is the difference?
TR 23.794 is the Rel-16 study on putting IMS on the 5G core. TS 23.228 is the stage 2 rule. The study fed the rule and never replaced it. TR 23.794
12 Maintenance is the main event: change requests and protocol alignment
Q12.1 What kind of document makes up most of this subject's paperwork?
3509 are change requests, plus 175 change-request packs and 38 draft change requests. Everything else is a small share. 3509 IMS documents are of type CR
Q12.2 A change request carries the outcome word "agreed". What does that tell you?
The outcome word is about that one document. 1736 IMS documents carry agreed and no store here says what any of them meant for the work. 1736 IMS documents carry the outcome word agreed
Q12.3 How often has the IETF protocol alignment work been reopened?
IMSProtoc, then IMSProtoc2 to IMSProtoc9, then IMSProtoc16 to IMSProtoc20-CT. Fourteen entries, one job. IMSProtoc
Q12.4 The justification of IMSProtoc2 in Rel-8 and of IMSProtoc20-CT in Rel-20 are
Both open by saying that Release 5 defined IMS and that its feature set is a basis for IP Multimedia support. Nothing else changed. why IMSProtoc20-CT was proposed
Q12.5 339 of the 345 IMS work plan rows stand at 100%. What does that number mean?
The register holds no status field for a work item at all. The percentage is bookkeeping somebody types in. 339 of the 345 IMS work plan rows stand at 100%
13 What is running now: Releases 18 to 20
Q13.1 Why was the Release 19 resiliency study opened?
The justification says exactly that, and names finance, aviation, logistics, automobile and electric power as the industries hit. why FS_IMS_RES was proposed
Q13.2 What does the Release 20 architecture study give as its reason for existing?
Those are the words of the justification. The study itself is about multi-vendor interoperable interfaces for those services. why FS_enIMS_ARC was proposed
Q13.3 The Release 20 architecture study names one report number and 47 IMS documents name another. What does this course do?
TR 23.801-03 is what the work item's own table names; TR 23.801-04 is what 47 IMS documents target and what the catalogue titles "Study on IMS Architecture Enhancement". TR 23.801-04
Q13.4 One Release 20 study carries "Deleted" at the front of its own name. What else does the record hold about it?
Both facts are in the record and both have to be written. "Deleted" is typed into the title by hand and is not a status field. FS_IMSRE_SEC
Q13.5 How many IMS work plan rows are marked Release 20?
7 rows for Rel-20 and 10 for Rel-19. A row is one group's share of one work item, so a handful of acronyms fills them. 7 IMS work plan rows are marked Rel-20
14 Reading the record yourself, and what it cannot tell you
Q14.1 Why is searching for the word IMS in a work item's title the wrong way to find this work?
IMS, IMS-CODEC, IMS_SSFDD and IMS_Corp2 all carry IMS in the acronym and none of them carries it in the title. Search the acronym. IMS
Q14.2 113 of the 151 papers that opened a work item carry 2017-10-05 as their upload stamp. What is that day?
SP-000216 was written for a meeting years before 2017 and carries that stamp. Date an old paper by its meeting, or not at all. SP-000216
Q14.3 What does the record hold about why a group decided something?
No store on this machine records a reason, a vote or an objection. The nearest thing to a reason is a work item description's own justification. 379 IMS documents carry the outcome word approved
Q14.4 IMS2, VoIMS and IMS-MMTel have no quotable work item description. What may this course say about what they set out to do?
IMS2, VoIMS and IMS-MMTel are among the 20 acronyms with no description that can be proved to belong to them. Nothing may be written about their objectives. IMS2
Q14.5 Every count in this course carries a method line. Why?
The method says the exact question that produced the number and the day it was asked, so the count can be run again and checked. 241 specifications this work touches