Download results in JSON format
UID | Acronym | Name | Rel | Groups | % | WI-tdoc | Rapporteur | links |
---|---|---|---|---|---|---|---|---|
820007 | FS_SIV | Study on Security Impacts of Virtualisation | Rel-18 | S3 | 100% | SP-181236 | Alex Leadbeater, BT Plc | [JSN] |
840054 | RACS | Optimisations on UE radio capability signalling | Rel-16 | 100% | RP-191460 | Haris Zisimopoulos | [JSN] | |
830079 | RACS-RAN | Optimisations on UE radio capability signalling – NR/E-UTRA Aspects | Rel-16 | R2 | 99% | RP-200164 | MediaTek | [JSN] |
800097 | FS_RACS_RAN | Study on optimisations on UE radio capability signalling – NR/E-UTRA Aspects | Rel-16 | R2 | 100% | RP-181459 | MediaTek | [JSN] |
830179 | RACS-RAN-Core | Core part: Optimisations on UE radio capability signalling – NR/E-UTRA Aspects | Rel-16 | R2 | 100% | RP-200164 | MediaTek | [JSN] |
880073 | RACS-UEConTest | UE Conformance Test Aspects - Optimisations on UE radio capability signalling - NR/E-UTRA Aspects | Rel-16 | R5 | 100% | RP-201152 | Yogesh Tugnawat, Qualcomm | [JSN] |
840008 | ISAT-MO-WITHDRAW | Withdrawal of TS 24.323 from Rel-11, Rel-12, Rel-13 | Rel-16 | C1 | 100% | CP-191151 | Dawes, Peter, Vodafone | [JSN] |
750005 | HORNS | HPLMN Radio Access Technology deployment Optimisation in Network Selection | Rel-15 | S1 | 100% | SP-170277 | Eddy Hall, Qualcomm Incorporated | [JSN] |
630007 | ISAT | IMS Signalling Activated Trace | Rel-14 | 100% | CP-150091 | Vodafone | [JSN] | |
630107 | ISAT | CT1 part of IMS Signalling Activated Trace | Rel-14 | C1 | 100% | CP-150091 | Vodafone | [JSN] |
651003 | ISAT | (IETF) IMS Signalling Activated Trace (draft-ietf-insipid-logme-marking) --> RFC 8497 | Rel-14 | C1-IETF | 100% | CP-150091 | Vodafone | [JSN] |
651103 | ISAT | (IETF) IMS Signalling Activated Trace (draft-ietf-insipid-logme-marking) --> RFC 8497 | Rel-14 | C3-IETF | 100% | CP-150091 | Vodafone | [JSN] |
651203 | ISAT | (IETF) IMS Signalling Activated Trace (draft-ietf-insipid-logme-marking) --> RFC 8497 | Rel-14 | C4-IETF | 100% | CP-150091 | Vodafone | [JSN] |
630207 | ISAT | CT3 part of IMS Signalling Activated Trace | Rel-14 | C3 | 100% | CP-150091 | Vodafone | [JSN] |
630307 | ISAT | CT4 part of IMS Signalling Activated Trace | Rel-14 | C4 | 100% | CP-150091 | Vodafone | [JSN] |
470035 | OAM-IRP-SS | IRP Solution Set specification organisation improvements | Rel-10 | S5 | 100% | SP-100774 | Nokia Siemens Networks, Huawei | [JSN] |
34037 | OMTIMS-CAJMP | Deleted - Characterisation of Adaptive Jitter Management Performance for VoIP Services | Rel-7 | S4 | 100% | SP-050432 | Lucent | [JSN] |
20026 | RANimp-RABSE-CodOptLCRTDD | Optimization of channelisation code utilisation for 1.28 Mcps TDD | Rel-7 | R1 | 100% | RP-040552 | UTStarcom | [JSN] |
21008 | RANimp-RABSE-CodeOptFDD | Optimization of downlink channelisation code utilisation | Rel-6 | R1 | 100% | - | Nortel | [JSN] |
21009 | RANimp-RABSE-CodOptTDD | optimization of channelisation code utilisation for 3.84 Mcps TDD | Rel-6 | R1 | 100% | - | IPWireless | [JSN] |
50082 | - | Standardisation effort | Rel-6 | GP | 100% | - | - | [JSN] |
50064 | FLOGER-Real | Realisation of a Flexible Layer One | Rel-6 | GP | 100% | GP-021019 | Nokia | [JSN] |
50065 | - | Technical Report on Realisation of a Flexible Layer One | Rel-6 | GP | 100% | GP-021019 | Nokia | [JSN] |
51004 | - | Channel Coding in 45.003 for Realisation of a Flexible Layer One | Rel-6 | G1 | 100% | GP-021019 | Nokia | [JSN] |
51005 | - | Performance Requirements in 45.005 for Realisation of a Flexible Layer One | Rel-6 | G1 | 100% | GP-021019 | Nokia | [JSN] |
51006 | - | Radio subsystem link control in 45.008 for Realisation of a Flexible Layer One | Rel-6 | G1 | 100% | GP-021019 | Nokia | [JSN] |
52085 | - | MBMS Re-synchronisation at cell change | Rel-6 | G2 | 100% | - | - | [JSN] |
34300 | CODCAR | Performance characterisation of default codecs for PS conversational multimedia application | Rel-6 | S4 | 100% | SP-020433 | Nokia | [JSN] |
13024 | CSData | Reorganisation of CS Data Specifications | Rel-6 | N3 | 100% | NP-040563 | Siemens | [JSN] |
2472 | RANimp-NBSLCR | Node B Synchronisation for 1.28 Mcps TDD | Rel-5 | R1 | 100% | - | CATT | [JSN] |
1801 | - | Protocol Standardisation of a SIM Toolkit Interpreter | Rel-5 | T3,T2 | 100% | TP-000116 | G & D | [JSN] |
2497 | - | Stage 1 for Protocol Standardisation of a SIM Toolkit Interpreter | Rel-5 | T3 | 100% | - | - | [JSN] |
2518 | - | Test specification for Protocol Standardisation of a SIM Toolkit Interpreter | Rel-5 | T3 | 100% | TP-010111 | Gemplus | [JSN] |
1820 | - | Technical Realisation | Rel-4 | T2 | 100% | TP-000078 | Siemens | [JSN] |
1325 | - | Standardisation of protocols (control & user planes) over Nb interface | Rel-4 | N3 | 100% | N4-000512 | - | [JSN] |
1326 | - | Standardisation of protocols over reference points between MSC server and Gateway MSC server | Rel-4 | N4 | 100% | N4-000512 | - | [JSN] |
1616 | - | Standardisation of detailed stage 2 description | Rel-4 | N4 | 100% | N4-000512 | - | [JSN] |
60180 | - | USIM application test specification | R99 | T3 | 100% | TP-99184 | - | [JSN] |
All information on this page is aggregated from the 3GPP WorkPlan.