Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S2-1812950 | Clarification on the PDU Session handover procedure with the User Plane Security Enforcement |
CR revision of S2-1811706 |
Apple, Ericsson | 23.502 15.3.0 CR#7933 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
agreed | [WTS] [JSN] |
S2-1812951 | Clarification on interworking with N26 interface |
CR revision of S2-1811812 |
Nokia, Nokia Shanghai Bell, Huawei, Hisillicon | 23.502 15.3.0 CR#7753 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
agreed | [WTS] [JSN] |
S2-1812952 | Clarification on the delivery of EBI to UE and RAN |
CR revision of S2-1812144 revised to S2-1812963 |
Huawei, HiSilicon | 23.502 15.3.0 CR#7824 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
revised | [WTS] [JSN] |
S2-1812953 | PDN Disconnection handling |
CR revision of S2-1812146 |
Huawei, HiSilicon | 23.502 15.3.0 CR#8421 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
agreed | [WTS] [JSN] |
S2-1812954 | Clarification on SMF registration to UDM+HSS |
CR revision of S2-1812147 revised to S2-1812964 |
Huawei, HiSilicon | 23.502 15.3.0 CR#8431 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
revised | [WTS] [JSN] |
S2-1812955 | Corrections to EPS to 5GS handover |
CR revision of S2-1811745 |
Cisco Systems | 23.502 15.3.0 CR#7433 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
agreed | [WTS] [JSN] |
S2-1812956 | Correction to handover from EPS to 5GS |
CR revision of S2-1812238 |
CATT, ZTE | 23.502 15.3.0 CR#8501 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
agreed | [WTS] [JSN] |
S2-1812957 | Clarification on the EPS to 5GS mobility with N26 |
CR revision of S2-1812292 |
ZTE | 23.502 15.3.0 CR#8531 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
merged | [WTS] [JSN] |
S2-1812958 | Clarification on the PDN connection release during N26 mobility |
CR revision of S2-1812293 revised to S2-1812965 |
ZTE | 23.502 15.3.0 CR#8541 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
revised | [WTS] [JSN] |
S2-1812959 | Correction to interworking procedures without N26 |
CR revision of S2-1812114 |
Huawei, HiSilicon | 23.502 15.3.0 CR#8371 catF | 5GS_Ph1 | Rel-15 |
S2-129 AI: 6.5.9 |
agreed | [WTS] [JSN] |
10 documents (0.2669939994812 seconds)