Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S2-1812940 New WID: Enhancements to the Service-Based 5G System Architecture WID new

revision of S2-1812080

revised to S2-1813367

China Mobile Rel-16 S2-129

AI: 6.19

revised [WTS] [JSN]
S2-1812941 Update for Solution#18: Further AMF modularization pCR

revision of S2-1811750

revised to S2-1813301

ZTE, China Mobile, Deutsche Telekom, KDDI 23.742 1.1.0 FS_eSBA Rel-16 S2-129

AI: 6.19

revised [WTS] [JSN]
S2-1812942 ESBA: Proposed conclusion for KI#1 pCR

revision of S2-1811852

revised to S2-1813302

ZTE, China Mobile, Deutsche Telekom, KDDI 23.742 1.1.0 FS_eSBA Rel-16 S2-129

AI: 6.19

revised [WTS] [JSN]
S2-1812943 KI#1 conclusion proposal pCR

revision of S2-1811818

Nokia, Nokia Shanghai Bell, Ericsson 23.742 1.1.0 FS_eSBA Rel-16 S2-129

AI: 6.19

approved [WTS] [JSN]
S2-1812944 Interim conclusion for UPF service pCR

revision of S2-1812078

revised to S2-1813293

China Mobile, CATT, AT&T 23.742 1.1.0 FS_eSBA Rel-16 S2-129

AI: 6.19

revised [WTS] [JSN]
S2-1812945 Proposed Conclusion for 23.742 Key Issue 3 Regarding Routing pCR

revision of S2-1811986

Oracle, Deutsche Telekom, Cisco, AT&T, Sprint, Verizon, KDDI, NTT Docomo, China Mobile, Ericsson, Interdigital INC, ZTE, ETRI, Tencent, Affirmed Networks 23.742 1.1.0 FS_eSBA Rel-16 S2-129

AI: 6.19

approved [WTS] [JSN]
S2-1812946 KI#3 interim conclusions communication options pCR

revision of S2-1811742

revised to S2-1813141

Ericsson, AT&T, Sprint, Verizon, Oracle, DT, CMCC, ZTE, NTT DOCOMO, InterDigital 23.742 1.1.0 FS_eSBA Rel-16 S2-129

AI: 6.19

revised [WTS] [JSN]
S2-1812947 Updates to KI#3 conclusion proposal for SBA communication options pCR

revision of S2-1811819

revised to S2-1813140

Nokia, Nokia Shanghai Bell, Huawei, HiSilicon 23.742 1.1.0 FS_eSBA Rel-16 S2-129

AI: 6.19

revised [WTS] [JSN]
S2-1812948 Avoiding mandatory MME impacts from 3-byte TAC CR

revision of S2-1811930

revised to S2-1812961

Qualcomm Incorporated, Nokia, Nokia Shanghai Bell 23.501 15.3.0 CR#6342 catF 5GS_Ph1 Rel-15 S2-129

AI: 6.5.9

revised [WTS] [JSN]
S2-1812949 Clarification on the AMF store the DNN and PGW-C+SMF to UDM+HSS CR

revision of S2-1812294

revised to S2-1812962

ZTE, Huawei 23.501 15.3.0 CR#6863 catF 5GS_Ph1 Rel-15 S2-129

AI: 6.5.9

revised [WTS] [JSN]

10 documents (0.28908491134644 seconds)