Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
N5-020348 | other | N5-18 | - | [WTS] [JSN] | |||||
PCG10_01r | Draft Agenda | other | Chairman | PCG-10 | - | [WTS] [JSN] | |||
PCG10_02 | List of Documents | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_03 | Actions Status list | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_04 | List of participants | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_05 | Report to PCG#10 on work in TSG SA | other | Chairman TSG SA | PCG-10 | - | [WTS] [JSN] | |||
PCG10_06 | CN Management Report | other | Stephen Hayes, Chair TSG CN | PCG-10 | - | [WTS] [JSN] | |||
PCG10_07 | TSG RAN#18 and 19 meeting report | other | TSG RAN Chairman | PCG-10 | - | [WTS] [JSN] | |||
PCG10_08 | 3GPP TSG T Management report | other | 3GPP TSG T Chairman, Sang-Keun Park | PCG-10 | - | [WTS] [JSN] | |||
PCG10_09 | TSG GERAN Management report | other | 3GPP TSG GERAN Chairman, Niels Peter Skov Andersen | PCG-10 | - | [WTS] [JSN] | |||
PCG10_10 | Report of 3GPP activities since PCG#9 | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_11 | TSG Calendar of meetings | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_12 | Work Programme changes since PCG#9 | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_12r | other | PCG-10 | - | [WTS] [JSN] | |||||
PCG10_12r1 | Work Programme changes since PCG#9 | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_13 | Status of release 5 | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_14 | Status and content of release 6 | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_15 | PCG Appointment of TSG Chairmen and vice chairmen | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_16 | OMA Cooperation framework with 3GPP | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_17 | Evolution of 3GPP System (3GPP TR 21.902 V0.2.0) | other | TSG SA Chairman | PCG-10 | - | [WTS] [JSN] | |||
PCG10_18 | GSA promotion of 3GPP work | other | Secretary | PCG-10 | - | [WTS] [JSN] | |||
PCG10_19 | Consideration of OFDM modulation in 3GPP | other | TSG RAN Chairman | PCG-10 | - | [WTS] [JSN] | |||
PCG10_20 | Chairman's satisfaction survey 2002 | other | MCC | PCG-10 | - | [WTS] [JSN] | |||
PCG10_21 | Co-ordination of SDO input to ITU T Q.1741.3 | other | TSG CN Chairman | PCG-10 | - | [WTS] [JSN] | |||
PCG10_22 | On referencing T1P1 trnasposed specifications | other | Chairman ITU T SSG | PCG-10 | - | [WTS] [JSN] | |||
PCG10_23 | Towards simpifying referencing of OP transposed specifications | other | Chairman ITU T SSG | PCG-10 | - | [WTS] [JSN] | |||
PCG10_24 | Recommendations and considerations on 3GPP cost savings | other | TSG Leaders | PCG-10 | - | [WTS] [JSN] | |||
PCG10_25 | Summary of recent progress in ITU T SSG | other | ITU T SSG Chairman (J. Visser, Nortel networks, Canada) | PCG-10 | - | [WTS] [JSN] | |||
PCG10_26r | other | PCG-10 | - | [WTS] [JSN] | |||||
PCG11_01r | other | PCG-11 | - | [WTS] [JSN] | |||||
PCG11_02r | other | PCG-11 | - | [WTS] [JSN] | |||||
PCG11_03 | Actions Status list | other | Secretary | PCG-11 | - | [WTS] [JSN] | |||
PCG11_04 | List of participants | other | Secretary | PCG-11 | - | [WTS] [JSN] | |||
PCG11_05 | Report to PCG#11 on work in TSG SA | other | Chairman TSG SA | PCG-11 | - | [WTS] [JSN] | |||
PCG11_06 | CN Management Report | other | Stephen Hayes, Chair TSG CN | PCG-11 | - | [WTS] [JSN] | |||
PCG11_07 | TSG RAN#20 and 21 Report | other | TSG RAN Chairman | PCG-11 | - | [WTS] [JSN] | |||
PCG11_08 | TSG T Management report for PCG#11 | other | TSG T Chairman, Sang-Keun Park | PCG-11 | - | [WTS] [JSN] | |||
PCG11_09 | TSG GERAN Management report | other | 3GPP TSG GERAN Chairman, Niels Peter Skov Andersen | PCG-11 | - | [WTS] [JSN] | |||
PCG11_10 | Report of MCC activities | other | Secretary | PCG-11 | - | [WTS] [JSN] | |||
PCG11_11 | TSG Calendar of meetings | other | Secretary | PCG-11 | - | [WTS] [JSN] | |||
PCG11_12 | Work Programme changes since PCG#10 | other | Secretary | PCG-11 | - | [WTS] [JSN] | |||
PCG11_13 | Status of Release 6 | other | Secretary | PCG-11 | - | [WTS] [JSN] | |||
PCG11_14 | Report of ITU T Forums Summit | other | PCG Chairman | PCG-11 | - | [WTS] [JSN] | |||
PCG11_15 | Technical report resulting from 3GPP evolution activity | other | TSG SA Chairman | PCG-11 | - | [WTS] [JSN] | |||
PCG11_16 | Key points arising from 3GPP-OMA Workshop, Frankfurt, 15 September 2003 | other | TSG SA Chairman | PCG-11 | - | [WTS] [JSN] | |||
PCG11_17 | Cost savings associated with TSG homework | other | CN Chairman | PCG-11 | - | [WTS] [JSN] | |||
PCG11_18 | Draft OMA-3GPP co-operation framework | other | Secretary | PCG-11 | - | [WTS] [JSN] | |||
PCG11_19 | OMA actions following the OMA-3GPP workshop | other | TSG SA Secretary | PCG-11 | - | [WTS] [JSN] | |||
PCG11_20 | UMTS Forum Work programme for year 2003 | other | UMTS Forum | PCG-11 | - | [WTS] [JSN] | |||
PCG11_21 | Selecting meeting venues | other | TSG SA Chairman | PCG-11 | - | [WTS] [JSN] | |||
PCG11_22 | Report to 3GPP PCG#11 | other | Alan Hadden, President GSA | PCG-11 | - | [WTS] [JSN] | |||
PCG11_23 | Draft summary minutes, decisions and actions from 3GPP PCG meeting#11, Bostom, 1 October 2003 | other | Secretary | PCG-11 | - | [WTS] [JSN] | |||
PCG11_23r | other | PCG-12 | - | [WTS] [JSN] | |||||
PCG12_01r | other | PCG-12 | - | [WTS] [JSN] | |||||
PCG12_02r | other | PCG-12 | - | [WTS] [JSN] | |||||
PCG12_02r1 | List of documents | other | Secretary | PCG-12 | - | [WTS] [JSN] | |||
PCG12_03 | Actions Satus list | other | Secretary | PCG-12 | - | [WTS] [JSN] | |||
PCG12_04r | other | PCG-12 | - | [WTS] [JSN] | |||||
PCG12_04r1 | List of participants | other | Secretary | PCG-12 | - | [WTS] [JSN] | |||
PCG12_05 | Report to PCG on work in TSG SA | other | Chairman TSG SA | PCG-12 | - | [WTS] [JSN] | |||
PCG12_06 | CN Management Report | other | Stephen Hayes, Chair TSG CN | PCG-12 | - | [WTS] [JSN] | |||
PCG12_07 | TSG RAN #22 and 23 meeting report | other | TSG RAN Chairman | PCG-12 | - | [WTS] [JSN] | |||
PCG12_08 | TSG T #22 and 23 Status Report for PCG | other | TSG T Chairman Sang-Keun Park | PCG-12 | - | [WTS] [JSN] | |||
PCG12_09 | TSG GERAN Mangement Report | other | 3GPP TSG GERAN Chairman, Niels Peter Skov Andersen | PCG-12 | - | [WTS] [JSN] | |||
PCG12_10 | GSMA input to 3GPP | other | GSMA | PCG-12 | - | [WTS] [JSN] | |||
PCG12_11 | Report of MCC activities since PCG#11 | other | MCC | PCG-12 | - | [WTS] [JSN] | |||
PCG12_12 | Work programme changes since PCG#11 | other | Secretary | PCG-12 | - | [WTS] [JSN] | |||
PCG12_13 | TSG Calendar of meetings | other | Secretary | PCG-12 | - | [WTS] [JSN] | |||
PCG12_14 | Status of Release 6 | other | Secretary | PCG-12 | - | [WTS] [JSN] | |||
PCG12_15 | TSG Plenary scheduling | other | CN Chairman | PCG-12 | - | [WTS] [JSN] | |||
PCG12_16 | GSMA response to Action PCG 10/1 Alternative 3G Ciphering and Encryption Algorithm | other | GSMA | PCG-12 | - | [WTS] [JSN] | |||
PCG12_17 | Collaboration between 3GPP and the Liberty Alliance Project | other | TSG CN Chairman | PCG-12 | - | [WTS] [JSN] | |||
PCG12_18 | Reply to request for close cooperation on future NGN standardisation | other | TSG SA Chairman | PCG-12 | - | [WTS] [JSN] | |||
PCG12_19 | Implementation of the ETSI IPR Policy | other | ETSI | PCG-12 | - | [WTS] [JSN] | |||
PCG12_20 | Report from GA and ad-hoc group in ETSI's IPR Policy operation | other | ETSI Director-General | PCG-12 | - | [WTS] [JSN] | |||
PCG12_21r | other | PCG-12 | - | [WTS] [JSN] | |||||
PCG12_21r1 | Updated MCC TF 160 ToR for approval | other | TSG T | PCG-12 | - | [WTS] [JSN] | |||
PCG12_22 | references in 3GPP specifications | other | 3GPP TSG SA Chairman, Niels Peter Skov Andersen | PCG-12 | - | [WTS] [JSN] | |||
PCG12_23 | Correspondence from Liberty Alliance Project | other | Secretary | PCG-12 | - | [WTS] [JSN] | |||
PCG12_24 | MMS Tranfer - Practical issues and IPR implications | other | Kevin Holley, TSG T vice-chair | PCG-12 | - | [WTS] [JSN] | |||
PCG12_25 | GSA report to 3GPP PCG#12 | other | Alan Hadden, President GSA | PCG-12 | - | [WTS] [JSN] | |||
PCG12_26r | other | PCG-12 | - | [WTS] [JSN] | |||||
PCG13_01r | other | PCG-13 | - | [WTS] [JSN] | |||||
PCG13_01r1 | Draft Agenda | other | Chairman | PCG-13 | - | [WTS] [JSN] | |||
PCG13_02r | other | PCG-13 | - | [WTS] [JSN] | |||||
PCG13_02r1 | List of documents | other | Secretary | PCG-13 | - | [WTS] [JSN] | |||
PCG13_03 | Actions Status list | other | Secretary | PCG-13 | - | [WTS] [JSN] | |||
PCG13_04 | List of Participants | other | Secretary | PCG-13 | - | [WTS] [JSN] | |||
PCG13_05 | Report to PCG on work in TSG SA | other | Chairman TSG SA | PCG-13 | - | [WTS] [JSN] | |||
PCG13_06 | CN Management Report | other | Stephen Hayes, Chair TSG CN | PCG-13 | - | [WTS] [JSN] | |||
PCG13_07 | TSG RAN #24 and 25 meeting report ?? | other | TSG RAN Chairman ? | PCG-13 | - | [WTS] [JSN] | |||
PCG13_08 | TSG T Management report for PCG#13 | other | TSG T Chairman Sang-Keun Park | PCG-13 | - | [WTS] [JSN] | |||
PCG13_09 | TSG GERAN Management report | other | 3GPP TSG GERAN Chairman, Niels Peter Skov Andersen | PCG-13 | - | [WTS] [JSN] | |||
PCG13_10 | GSMA support for 3G and W-CDMA | other | Bill Best, GSM Association CTO | PCG-13 | - | [WTS] [JSN] | |||
PCG13_11 | Report of MCC activities since PCG#12 | other | Secretary | PCG-13 | - | [WTS] [JSN] | |||
PCG13_12 | Work programme changes since PCH#12 | other | Secretary | PCG-13 | - | [WTS] [JSN] | |||
PCG13_13 | TSG Meeting calendar | other | Secretary | PCG-13 | - | [WTS] [JSN] | |||
PCG13_14 | Content of Release 6 and release 7 | other | MCC | PCG-13 | - | [WTS] [JSN] | |||
PCG13_15 | TSG reorganization proposal | other | TSG leaders | PCG-13 | - | [WTS] [JSN] | |||
PCG13_16 | Comments on TSG reorganization | other | ARIB/TTC | PCG-13 | - | [WTS] [JSN] | |||
PCG13_17 | 3GPP reorganization | other | TSG T WG2 Chairman | PCG-13 | - | [WTS] [JSN] | |||
PCG13_18 | Terms of reference for Task 172 | other | TSG GERAN | PCG-13 | - | [WTS] [JSN] | |||
PCG13_19 | UMTS Security Awarness | other | UMTS Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_20 | UMTS Next generation devices | other | UMTS Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_21 | WLAN spectrum report after WRC-03 | other | UMTS Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_22 | 3G offered traffic characteristics | other | UMTS Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_23 | Informing Suppliers about user behaviour to better prepare them for their 3G/UMTS customers | other | UMTS Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_24 | Market Evolution and forecast | other | UMTS Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_25 | Benefits of Mobile Communications for society | other | UMTS Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_26 | Report to 3GPP PCG#13 | other | Alan Hadden, President GSA | PCG-13 | - | [WTS] [JSN] | |||
PCG13_27 | The numbers add-up with GSMA and W-CDMA | other | GSA | PCG-13 | - | [WTS] [JSN] | |||
PCG13_28 | Correspondence received from ATIS | other | PCG Chairman | PCG-13 | - | [WTS] [JSN] | |||
PCG13_29 | IPv6 Update | other | Bosco Fernandes IPv6 Forum & European TF Steering Committee | PCG-13 | - | [WTS] [JSN] | |||
PCG13_30 | IPv6 Case: Questions and Answers | other | IPv6 Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_31 | Strategic considerations for IMS - the 3G evolution | other | UMTS Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_32 | Relative Assessment of UMTS TDD and WLAN technologies | other | UMTS Forum | PCG-13 | - | [WTS] [JSN] | |||
PCG13_33 | Proposed response to ATIS | other | CN Chairman | PCG-13 | - | [WTS] [JSN] | |||
PCG13_34 | Draft summary minutes, decisions and actions from 3GPP PCG Meeting#13 in Seoul, 6 October 2004 | other | Secretary | PCG-13 | - | [WTS] [JSN] | |||
PCG13_34r | other | PCG-14 | - | [WTS] [JSN] | |||||
PCG14_01 | Draft agenda | other | Chairman | PCG-14 | - | [WTS] [JSN] | |||
PCG14_02 | List of documents | other | Secretary | PCG-14 | - | [WTS] [JSN] | |||
PCG14_03 | Actions Status list | other | Secretary | PCG-14 | - | [WTS] [JSN] | |||
PCG14_05 | Report to PCG on work in TSG SA | other | Leaving chairman TSG SA | PCG-14 | - | [WTS] [JSN] | |||
PCG14_06 | CN Management report | other | Stephen Hayes, ex-Chair TSG CN | PCG-14 | - | [WTS] [JSN] | |||
PCG14_07 | TSG T Management report for PCG#14 | other | TSG T Chairman Sang-Keun Park | PCG-14 | - | [WTS] [JSN] | |||
PCG14_08 | CT Management report | other | Hannu Hietalahti, 3GPP TSG CT Chairman | PCG-14 | - | [WTS] [JSN] | |||
PCG14_09 | PCG Appointment of TSG Chairmen and vice chairmen | other | Secretary | PCG-14 | - | [WTS] [JSN] | |||
PCG14_10 | TSG RAN #26 and #27 meeting report | other | Old and new TSG RAN Chairman | PCG-14 | - | [WTS] [JSN] | |||
PCG14_11 | TSG GERAN Management report | other | Leaving 3GPP TSG GERAN Chairman | PCG-14 | - | [WTS] [JSN] | |||
PCG14_12 | Frozen contents of release 6 | other | Secretary | PCG-14 | - | [WTS] [JSN] | |||
PCG14_13 | Work Programme changes since PCG#13 | other | Secretary | PCG-14 | - | [WTS] [JSN] | |||
PCG14_14 | Report of MCC activities since PCG#13 | other | Secretary | PCG-14 | - | [WTS] [JSN] | |||
PCG14_15 | The UMTS Forum Annual Report 2004 and directions for 2005 | other | UMTS Forum | PCG-14 | - | [WTS] [JSN] | |||
PCG14_16 | 3G/UMTS Towards mobile broadband and personal Internet | other | UMTS Forum | PCG-14 | - | [WTS] [JSN] | |||
PCG14_17 | Report no 37 from the UMTS Forum, Magic mobile future, 2010-2020 | other | UMTS Forum | PCG-14 | - | [WTS] [JSN] | |||
PCG14_18 | UMTS Forum report no 38, Coverage extension bands for UMTS/IMT-2000 in the bands between 470-600 MHz | other | UMTS Forum | PCG-14 | - | [WTS] [JSN] | |||
PCG14_19 | Codec Licensing Conditions | other | GSMA | PCG-14 | - | [WTS] [JSN] | |||
PCG14_20 | Revised Terms of Reference for TSG RAN | other | TSG RAN Chairman | PCG-14 | - | [WTS] [JSN] | |||
PCG14_22r | other | PCG-14 | - | [WTS] [JSN] | |||||
PCG14_22r1 | Frozen contents of release 7 | other | Secretary | PCG-14 | - | [WTS] [JSN] | |||
PCG14_23 | Proposed change to the size of the OP Delegations to the PCG | other | ATIS | PCG-14 | - | [WTS] [JSN] | |||
PCG14_24 | UMTS Forum Market update, activities and workplan 2004/5 | other | J_P Bienaimé, Chairman UMTS Forum | PCG-14 | - | [WTS] [JSN] | |||
PCG14_25 | Global Mobile Dialogue, GSA Newsletter : Issue 11 : March 2005 | other | GSA | PCG-14 | - | [WTS] [JSN] | |||
PCG14_26 | Press release, GSA announces next GSM/EDGE steps to enhance service continuity with EDGE evolution | other | GSA | PCG-14 | - | [WTS] [JSN] | |||
PCG14_27 | Market Representation partner report to 3GPP PCG | other | Alan Hadden, Presidfent of GSA | PCG-14 | - | [WTS] [JSN] | |||
PCG14_29 | Draft summary minutes, decisions and actions from 3GPp PCG Meeting#14, Cancun, 21 April 2005 | other | Secretary | PCG-14 | - | [WTS] [JSN] | |||
PCG14_29r | other | PCG-15 | - | [WTS] [JSN] | |||||
PCG15_01r | other | PCG-15 | - | [WTS] [JSN] | |||||
PCG15_01r1 | Draft agenda | other | Chairman | PCG-15 | - | [WTS] [JSN] | |||
PCG15_02 | List of documents | other | Secteratry | PCG-15 | - | [WTS] [JSN] | |||
PCG15_03 | Actions status list | other | Secretary | PCG-15 | - | [WTS] [JSN] | |||
PCG15_05 | Report from CT#29 | other | Hannu Hietalahti, 3GPP TSG CT Chairman | PCG-15 | - | [WTS] [JSN] | |||
PCG15_06 | TSG RAN #28 and #29 meeting report | other | TSG RAN Chairman | PCG-15 | - | [WTS] [JSN] | |||
PCG15_07 | TSG GERAN Management report | other | 3GPP TSG GERAN Chairman | PCG-15 | - | [WTS] [JSN] | |||
PCG15_08 | SA Management report | other | Stephen Hayes, TSG SA Chair | PCG-15 | - | [WTS] [JSN] | |||
PCG15_09 | Draft Contents of release 7 | other | Sectretary | PCG-15 | - | [WTS] [JSN] | |||
PCG15_10 | Work programme changes since PCG#14 | other | Secretary | PCG-15 | - | [WTS] [JSN] | |||
PCG15_11 | Report of MCC activities since PCG#14 | other | Adrian Scrase, MCC | PCG-15 | - | [WTS] [JSN] | |||
PCG15_12 | Way to solve the dispute on bands of 1900 - 1920 MHz and 2010 - 2025 MHz | other | CCSA | PCG-15 | - | [WTS] [JSN] | |||
PCG15_13 | Proposed terms of reference for Communications Strategy Group | other | A. Hadden, K. Lathia, J-P Bienaimé | PCG-15 | - | [WTS] [JSN] | |||
PCG15_14 | Update of MCC Tas 160 description and Terms of reference | other | TSG RAN Chairman | PCG-15 | - | [WTS] [JSN] | |||
PCG15_15 | H. 264/AVC codec donation - Licensing statement | other | TSG SA Chairman | PCG-15 | - | [WTS] [JSN] | |||
PCG15_16 | TSG RAN 3GPP LTE Report | other | TSG RAN Chairman | PCG-15 | - | [WTS] [JSN] | |||
PCG15_17 | GSMA Update | other | GSMA | PCG-15 | - | [WTS] [JSN] | |||
PCG15_18 | Progress of evolution-related work in 3GPP | other | TTC | PCG-15 | - | [WTS] [JSN] | |||
PCG15_19 | MRP report to 3GPP | other | Chris Pearson, President 3G Americas | PCG-15 | - | [WTS] [JSN] | |||
PCG15_20 | MRP Report 3GPP PCG#15 | other | Alan Hadden, President GSA | PCG-15 | - | [WTS] [JSN] | |||
PCG15_21 | UMTS Forum Overview of recent activities | other | J. P. Bienaimé, Chairman UMTS Forum | PCG-15 | - | [WTS] [JSN] | |||
PCG15_22 | White paper from the UMTS Forum | other | UMTS Forum | PCG-15 | - | [WTS] [JSN] | |||
PCG15_23 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting #15, Sophia Antipolis 6 October 2005 | other | Secretary | PCG-15 | - | [WTS] [JSN] | |||
PCG15_23r | other | PCG-16 | - | [WTS] [JSN] | |||||
PCG15_23r1 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting #15, Sophia Antipolis 6 October 2005 | other | Secretary | PCG-16 | - | [WTS] [JSN] | |||
PCG16_01r | other | PCG-16 | - | [WTS] [JSN] | |||||
PCG16_01r2 | Draft agenda | other | Chairman | PCG-16 | - | [WTS] [JSN] | |||
PCG16_02r | other | PCG-16 | - | [WTS] [JSN] | |||||
PCG16_02r1 | List of documents | other | Secretary | PCG-16 | - | [WTS] [JSN] | |||
PCG16_03 | Actions status list | other | Secretary | PCG-16 | - | [WTS] [JSN] | |||
PCG16_05r | other | PCG-16 | - | [WTS] [JSN] | |||||
PCG16_05r1 | TSG GERAN Management Report | other | 3GPP TSG GERAN Chairman | PCG-16 | - | [WTS] [JSN] | |||
PCG16_06 | TSG RAN #30 and #31 meeting report | other | TSG RAN Chairman | PCG-16 | - | [WTS] [JSN] | |||
PCG16_07 | proposed changes to the 3GPP Working Procedures | other | Working Procedures group | PCG-16 | - | [WTS] [JSN] | |||
PCG16_08 | TSG CT Management report | other | TSG CT Chairman | PCG-16 | - | [WTS] [JSN] | |||
PCG16_09 | TSG SA Management Report | other | TSG SA Chairman | PCG-16 | - | [WTS] [JSN] | |||
PCG16_10 | TSG RAN LTE Report | other | TSG RAN Chairman | PCG-16 | - | [WTS] [JSN] | |||
PCG16_11 | UMTS Forum Annual report 2005 and directions for 2006 | other | UMTS Forum | PCG-16 | - | [WTS] [JSN] | |||
PCG16_12 | White paper "HSPA: High Speed Wireless Broadband - From HSDPA to HSUPA and Beyond" | other | UMTS Forum | PCG-16 | - | [WTS] [JSN] | |||
PCG16_13 | Key Findings from the UMTS Forum Report 39 "The global market for High Speed Packet Access (HSPA): quantitative and qualitative analysis" | other | UMTS Forum | PCG-16 | - | [WTS] [JSN] | |||
PCG16_14 | Update on recent UMTS Forum activities to 3GPP/PCG#16 | other | UMTS Forum | PCG-16 | - | [WTS] [JSN] | |||
PCG16_15 | UMTS Forum Report 39: "The global market for High Speed Packet Access (HSPA): quantitative & qualitative analysis" | other | UMTS Forum | PCG-16 | - | [WTS] [JSN] | |||
PCG16_16 | UMTS Forum contribution to the ITU-R WP8F meeting, January 2006: "Development of Spectrum Requirement Forecasts for IMT-2000 & Systems beyond IMT-2000 (IMT Advanced)" | other | UMTS Forum | PCG-16 | - | [WTS] [JSN] | |||
PCG16_17 | White Paper: "Frequency bands available for UMTS around the world". | other | UMTS Forum | PCG-16 | - | [WTS] [JSN] | |||
PCG16_18 | SOS Interop workshop series- Wrap up and what’s next | other | ETSI | PCG-16 | - | [WTS] [JSN] | |||
PCG16_19 | Update ToR for MCC task 272 on GERAN to UTRAN Inter-RAT Handover TTCN test cases | other | TSG GERAN Chairman | PCG-16 | - | [WTS] [JSN] | |||
PCG16_20 | Work Programme changes since PCG#15 | other | Secretary | PCG-16 | - | [WTS] [JSN] | |||
PCG16_21 | Draft Content of Release 7 | other | Secretary | PCG-16 | - | [WTS] [JSN] | |||
PCG16_22 | Report of MCC Activities since PCG#15 | other | Secretary | PCG-16 | - | [WTS] [JSN] | |||
PCG16_23 | GSMA Update | other | GSMA | PCG-16 | - | [WTS] [JSN] | |||
PCG16_24 | FDD UL in unpaired spectrum | other | Global UMTS TDD Alliance | PCG-16 | - | [WTS] [JSN] | |||
PCG16_25 | MRP Application from Global UMTS TDD Alliance | other | Global UMTS TDD Alliance | PCG-16 | - | [WTS] [JSN] | |||
PCG16_26 | Update on the Global Deployment of 3GPP Systems | other | GSA | PCG-16 | - | [WTS] [JSN] | |||
PCG16_27 | Communications Strategy Group | other | GSA, GSMA, UMTS Forum, 3G Americas | PCG-16 | - | [WTS] [JSN] | |||
PCG16_28 | MRP report to 3GPP | other | Chris Pearson, President 3G Americas | PCG-16 | - | [WTS] [JSN] | |||
PCG16_29 | GSA Report to PCG#16 | other | GSA | PCG-16 | - | [WTS] [JSN] | |||
PCG16_30 | Draft summary minutes, decisions and actions from PCG meeting#16, Beijing, 20 April 2006 | other | Secretary | PCG-16 | - | [WTS] [JSN] | |||
PCG16_30r | other | PCG-17 | - | [WTS] [JSN] | |||||
PCG16_30r1 | Revised draft summary minutes, decisions and actions from 3GPP PCG Meeting #16, Beijing, 20 April 2006 | other | Secretary | PCG-17 | - | [WTS] [JSN] | |||
PCG17_01r | other | PCG-17 | - | [WTS] [JSN] | |||||
PCG17_01r2 | Draft agenda | other | Chairman | PCG-17 | - | [WTS] [JSN] | |||
PCG17_02r | other | PCG-17 | - | [WTS] [JSN] | |||||
PCG17_02r1 | List of documents | other | Secretary | PCG-17 | - | [WTS] [JSN] | |||
PCG17_03r | other | PCG-17 | - | [WTS] [JSN] | |||||
PCG17_03r1 | Actions Status list | other | Secretary | PCG-17 | - | [WTS] [JSN] | |||
PCG17_04 | TSG CT Management Report | other | TSG CT Chairman | PCG-17 | - | [WTS] [JSN] | |||
PCG17_05 | other | PCG-17 | - | [WTS] [JSN] | |||||
PCG17_05r1 | TSG RAN Management Report | other | TSG RAN Chairman | PCG-17 | - | [WTS] [JSN] | |||
PCG17_06 | TSG GERAN Management Report | other | TSG GERAN Chairman | PCG-17 | - | [WTS] [JSN] | |||
PCG17_07 | TSG SA Management Report | other | TSG SA Chairman | PCG-17 | - | [WTS] [JSN] | |||
PCG17_08 | Content of Release 7 and draft Content of Release 8 | other | Secretary | PCG-17 | - | [WTS] [JSN] | |||
PCG17_09 | Work Programme changes since PCG#16 | other | Secretary | PCG-17 | - | [WTS] [JSN] | |||
PCG17_10 | Report of MCC activities since PCG#16 | other | Secretary | PCG-17 | - | [WTS] [JSN] | |||
PCG17_11 | CCSA letter of support for Ms Wang as PCG Chairman 2007 | other | Secretary | PCG-17 | - | [WTS] [JSN] | |||
PCG17_12 | 3GPP LTE Report and Timeline | other | TSG RAN Chairman | PCG-17 | - | [WTS] [JSN] | |||
PCG17_13 | Study on 3GPP TSG RAN and GERAN Merge | other | 3GPP TSG GERAN and TSG RAN Chairmen | PCG-17 | - | [WTS] [JSN] | |||
PCG17_14 | Prevention of a Fragmented 3GPP IP Multimedia Subsystem (IMS) | other | ATIS | PCG-17 | - | [WTS] [JSN] | |||
PCG17_15r | other | PCG-17 | - | [WTS] [JSN] | |||||
PCG17_15r1 | Proposed change to article 35 of 3GPP Working Procedures | other | Chairman of Working Procedures ad hoc group | PCG-17 | - | [WTS] [JSN] | |||
PCG17_16 | IMS Workshop Conclusions | other | TSG SA and TSG CT Chairmen | PCG-17 | - | [WTS] [JSN] | |||
PCG17_17r | other | PCG-17 | - | [WTS] [JSN] | |||||
PCG17_17r3 | Proposal for an initial discussion to further explore potential synergies between 3GPP, ETSI TISPAN, and also other SDOs/Fora for IMS/NGN | other | ETSI | PCG-17 | - | [WTS] [JSN] | |||
PCG17_18 | 2007 TTCN workload and funding (RAN + GERAN) | other | TSG RAN and TSG GERAN Chairmen | PCG-17 | - | [WTS] [JSN] | |||
PCG17_19 | MobileIGNITE FMC Industry Update | other | MobileIGNITE | PCG-17 | - | [WTS] [JSN] | |||
PCG17_20 | 3GPP Communications Strategy Group Report | other | GSA | PCG-17 | - | [WTS] [JSN] | |||
PCG17_21 | GSA Report to PCG#17 | other | GSA | PCG-17 | - | [WTS] [JSN] | |||
PCG17_22 | 3G Americas MRP Report to 3GPP | other | 3G Americas | PCG-17 | - | [WTS] [JSN] | |||
PCG17_23 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#17, San Jose del Cabo, 11 October 2006 | other | Secretary | PCG-17 | - | [WTS] [JSN] | |||
PCG18_01r | other | PCG-18 | - | [WTS] [JSN] | |||||
PCG18_01r2 | Draft Agenda | other | Chairman | PCG-18 | - | [WTS] [JSN] | |||
PCG18_02r | other | PCG-18 | - | [WTS] [JSN] | |||||
PCG18_02r1 | List of documents | other | Secretary | PCG-18 | - | [WTS] [JSN] | |||
PCG18_03 | Actions status list | other | Secretary | PCG-18 | - | [WTS] [JSN] | |||
PCG18_04 | TSG CT Management Report | other | TSG CT Chairman | PCG-18 | - | [WTS] [JSN] | |||
PCG18_05 | TSG RAN Management Report | other | TSG RAN Chairman | PCG-18 | - | [WTS] [JSN] | |||
PCG18_06 | TSG GERAN Management Report | other | TSG GERAN Chairman | PCG-18 | - | [WTS] [JSN] | |||
PCG18_07 | TSG SA Management Report | other | TSG SA Chairman | PCG-18 | - | [WTS] [JSN] | |||
PCG18_08 | Content of Release 7 and draft Content of Release 8 | other | Secretary | PCG-18 | - | [WTS] [JSN] | |||
PCG18_09 | Work Programme changes since PCG#17 | other | Secretary | PCG-18 | - | [WTS] [JSN] | |||
PCG18_11 | Appointment of TSG Chairmen, elected during TSG Meetings in Cyprus, 7-15 March 2007 | other | Secretary | PCG-18 | - | [WTS] [JSN] | |||
PCG18_12 | Revised Terms of Reference for MCC Task 160 | other | TSG RAN Chairman | PCG-18 | - | [WTS] [JSN] | |||
PCG18_13 | Frequency Harmonisation Study | other | UMTS Forum | PCG-18 | - | [WTS] [JSN] | |||
PCG18_14 | Mobile TV, the groundbreaking dimension | other | UMTS Forum | PCG-18 | - | [WTS] [JSN] | |||
PCG18_15 | UMTS Forum Annual Report 2006-2007 | other | UMTS Forum | PCG-18 | - | [WTS] [JSN] | |||
PCG18_16 | UMTS Forum White Paper: 3G/UMTS Evolution | other | UMTS Forum | PCG-18 | - | [WTS] [JSN] | |||
PCG18_17 | GSA Report to PCG#18 | other | GSA | PCG-18 | - | [WTS] [JSN] | |||
PCG18_18 | GSM Network Update | other | GSA | PCG-18 | - | [WTS] [JSN] | |||
PCG18_19 | UMTS Forum Activity Report | other | UMTS Forum | PCG-18 | - | [WTS] [JSN] | |||
PCG18_20 | The Latest Development of TD-SCDMA | other | TDIA | PCG-18 | - | [WTS] [JSN] | |||
PCG18_21 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#18, Delhi, 18 April 2007 | other | Secretary | PCG-18 | - | [WTS] [JSN] | |||
PCG19_34r | other | PCG-20 | - | [WTS] [JSN] | |||||
PCG19_34r1 | Draft revised Summary minutes, decisions and actions from 3GPP PCG Meeting#19, Brasilia, Brazil, 17 December 2007 | other | Secretary | PCG-20 | - | [WTS] [JSN] | |||
PCG1_01r1 | Proposed draft agenda | other | ETSI | PCG-1 | - | [WTS] [JSN] | |||
PCG1_02 | List of participants | other | ETSI | PCG-1 | - | [WTS] [JSN] | |||
PCG1_03 | List of documents | other | ETSI | PCG-1 | - | [WTS] [JSN] | |||
PCG1_04 | Tasks assigned to PCG | other | Secretary | PCG-1 | - | [WTS] [JSN] | |||
PCG1_05 | Candidatures received for 3GPP positions | other | Secretary | PCG-1 | - | [WTS] [JSN] | |||
PCG1_06 | Proposals for managing the TSG Project coordination role | other | Fred Harrison, TSG-SA Convenor | PCG-1 | - | [WTS] [JSN] | |||
PCG1_07 | Structure of the UMTS specification series | other | ETSI SMG | PCG-1 | - | [WTS] [JSN] | |||
PCG1_08 | Liaison statement on IPR statement in 3GPPspecifications | other | TSG RAN WG4 | PCG-1 | - | [WTS] [JSN] | |||
PCG1_09 | Proposed working methods for 3GPP technical Specification Groups | other | SMG Group on Working Mathodsb (WOME) | PCG-1 | - | [WTS] [JSN] | |||
PCG1_10 | Deadline for submitting contributions for decisions in meetings | other | AT&T (T1) | PCG-1 | - | [WTS] [JSN] | |||
PCG1_11 | Third generation mobile communications: the way forward for IPR | other | ETSI | PCG-1 | - | [WTS] [JSN] | |||
PCG1_12 | Project team support for WGs of 3GPP TSGs | other | TSG SA WG2 (Architecture Aspect) | PCG-1 | - | [WTS] [JSN] | |||
PCG1_13 | Appointment of TSG leadership at Fort Lauderdale | other | PCG | PCG-1 | - | [WTS] [JSN] | |||
PCG1_14 | Liaison statement to PCG | other | Chairment of ITU-T study groups 11,4 and 7 | PCG-1 | - | [WTS] [JSN] | |||
PCG1_15 | Status report of UMTS activities within SMG2 | other | ETSI SMG2 | PCG-1 | - | [WTS] [JSN] | |||
PCG1_16r1 | Managing the TSG Project Co-ordination role | other | PCG | PCG-1 | - | [WTS] [JSN] | |||
PCG1_17 | 3G standardization on target to meet December, 1999 deadline. 3G speech codec agreed at Fort Lauderdale, USA (meeting of 3GPP). | other | PCG | PCG-1 | - | [WTS] [JSN] | |||
PCG1_18 | LS regarding the technical coordination between the 3GPP TSGs. | other | TSG-T | PCG-1 | - | [WTS] [JSN] | |||
PCG1_19 | Proposal for REVISED ToR for TSG-Terminals | other | TSG-T | PCG-1 | - | [WTS] [JSN] | |||
PCG1_20 | Project team support for WGs of 3GPP TSGs | other | TSG-T | PCG-1 | - | [WTS] [JSN] | |||
PCG1_21 | proposed Project team support requirements | other | TSG-CN Convenor, Stephen Hayes | PCG-1 | - | [WTS] [JSN] | |||
PCG1_22r1 | proposal for possible liaison procedure with ITU-T | other | TSG RAN ITU Ad Hoc Contact Person | PCG-1 | - | [WTS] [JSN] | |||
PCG20_01r | other | PCG-20 | - | [WTS] [JSN] | |||||
PCG20_01r2 | Draft Agenda | other | Chairman | PCG-20 | - | [WTS] [JSN] | |||
PCG20_02r | other | PCG-20 | - | [WTS] [JSN] | |||||
PCG20_02r1 | List of documents | other | Secretary | PCG-20 | - | [WTS] [JSN] | |||
PCG20_03 | Actions status list | other | Secretary | PCG-20 | - | [WTS] [JSN] | |||
PCG20_04 | TSG Leadership Recommendations on Process Improvements | other | Stephen Hayes on behalf of the TSG Leadership | PCG-20 | - | [WTS] [JSN] | |||
PCG20_05r | other | PCG-20 | - | [WTS] [JSN] | |||||
PCG20_05r1 | IM Comments on Process Improvements | other | Stephen Hayes on behalf of the 3GPP Membership | PCG-20 | - | [WTS] [JSN] | |||
PCG20_06 | Collaboration 3GPP - ITU | other | ITU-T | PCG-20 | - | [WTS] [JSN] | |||
PCG20_07 | TSG SA Management Report | other | TSG SA Chairman | PCG-20 | - | [WTS] [JSN] | |||
PCG20_08 | Proposal on Improvement of 3GPP Standardisation Process | other | ARIB/TTC | PCG-20 | - | [WTS] [JSN] | |||
PCG20_09 | Input from joint ARIB/TTC adhoc for 3GPP process improvement | other | ARIB/TTC | PCG-20 | - | [WTS] [JSN] | |||
PCG20_10 | Work Programme changes since PCG#19 | other | Secretary | PCG-20 | - | [WTS] [JSN] | |||
PCG20_11 | The Latest Deployment of TD-SCDMA | other | TD-SCDMA Industry Alliance | PCG-20 | - | [WTS] [JSN] | |||
PCG20_12 | UMTS Forum Annual Report 2007 and Directions for 2008 | other | UMTS Forum | PCG-20 | - | [WTS] [JSN] | |||
PCG20_13 | White Paper: Towards Global Mobile Broadband | other | UMTS Forum | PCG-20 | - | [WTS] [JSN] | |||
PCG20_14 | TSG GERAN Management Report | other | TSG GERAN Chairman | PCG-20 | - | [WTS] [JSN] | |||
PCG20_15 | TSG CT Management Report | other | TSG CT Chairman | PCG-20 | - | [WTS] [JSN] | |||
PCG20_16r | other | PCG-20 | - | [WTS] [JSN] | |||||
PCG20_16r1 | 3G Americas MRP Report to 3GPP | other | 3G Americas | PCG-20 | - | [WTS] [JSN] | |||
PCG20_17 | TSG-RAN Management Report | other | TSG RAN Chairman | PCG-20 | - | [WTS] [JSN] | |||
PCG20_18 | TSG RAN Revised Terms of Reference | other | TSG RAN Chairman | PCG-20 | - | [WTS] [JSN] | |||
PCG20_19 | UMTS Forum/Analysys LTE Market Study | other | UMTS Forum | PCG-20 | - | [WTS] [JSN] | |||
PCG20_20 | Content of Release 8 and Release 9 | other | Secretary | PCG-20 | - | [WTS] [JSN] | |||
PCG20_21 | GSA Report to 3GPP PCG#20 | other | GSA | PCG-20 | - | [WTS] [JSN] | |||
PCG20_22 | Qualifications for hosting 3GPP Meetings | other | ATIS | PCG-20 | - | [WTS] [JSN] | |||
PCG20_23 | MCC Report to PCG | other | Secretary | PCG-20 | - | [WTS] [JSN] | |||
PCG20_24 | Draft 3GPP Communications Plan Presentation | other | 3GPP Communications Officer | PCG-20 | - | [WTS] [JSN] | |||
PCG20_25 | Draft 3GPP Communications Plan | other | 3GPP Communications Officer | PCG-20 | - | [WTS] [JSN] | |||
PCG20_26 | UMTS Forum Summary of recent activities | other | UMTS Forum | PCG-20 | - | [WTS] [JSN] | |||
PCG20_27 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#20, Juan Les Pins, France, 22 April 2008 | other | Secretary | PCG-20 | - | [WTS] [JSN] | |||
PCG20_27r | other | PCG-ah-27140 | - | [WTS] [JSN] | |||||
PCG21_01r | other | PCG-ah-27140 | - | [WTS] [JSN] | |||||
PCG21_02r | other | PCG-ah-27140 | - | [WTS] [JSN] | |||||
PCG21_03 | Action Status List | other | Secretary | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_04 | CT Management report | other | Hannu Hietalahti, Chairman of TSG CT | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_05r | other | PCG-ah-27140 | - | [WTS] [JSN] | |||||
PCG21_06 | TSG GERAN report to PCG#21 | other | TSG GERAN Chairman J. Achard | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_07 | SA Management Report | other | Stephen hayes, TSG SA Chair | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_08 | Content of Release 8 and release 9 | other | Secretary | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_09r | other | PCG-ah-27140 | - | [WTS] [JSN] | |||||
PCG21_10 | MCC Activity Report | other | Adrian Scrase, MCC | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_11r | other | PCG-ah-27140 | - | [WTS] [JSN] | |||||
PCG21_12 | Chairman and Vice-Cahirmen of 3GPP PCG | other | Secretary | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_13 | Answer to ITU-R WP 5D “Liaison Statement to External Organisations - Request for parameters of IMT Radio Interface Technologies following WRC-07” Document 5D/TEMP/62 (Rev.1) | other | ITU- R Ad Hoc Drafting Group | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_14 | Proposed Update reminder for the OPs on the compliance with ITU-R procedures as it relates to Revision 8 of Recommendation ITU-R M.1457 | other | ITU-R Ad Hoc | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_15 | Update Submission for UTRA FDD and TDD toward Revision 9 of Recommendation ITU-R M.1457 | other | ITU-R Ad Hoc | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_16 | MRP report to 3GPP | other | President of 3G Americas, Chris Pearson | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_17 | UMTS Evolution From 3GPP release 7 to release 8 | other | 3G Americas | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_18 | Defining 4G Understandint the ITU process for the next generatuon of wireless technology | other | 3G Americas | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_19 | EDGE, HSPA and LTE Broadband Innovation | other | 3G Americas | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_20 | The case for evolved EDGE | other | 3G Americas | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_21 | GSMA slides for 3GPP PCG#21 | other | GSMA | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_22r | other | PCG-ah-27140 | - | [WTS] [JSN] | |||||
PCG21_23 | Femto Forum Femtocell market update for 3GPP PCG | other | FemtoForum | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_24 | GSA REPORT TO 3GPP PCG #21 | other | GSA | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_25 | UMTS Forum Summary of recent activities | other | Jean-Pierre Bienaimé, Chairman of UMTS Forum | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_25r | other | PCG-ah-27140 | - | [WTS] [JSN] | |||||
PCG21_26r | other | PCG-ah-27140 | - | [WTS] [JSN] | |||||
PCG21_27 | Summary minutes, decisions and actions from 3GPP PCG Meeting#21, Moscow, Russia, 6 October 2008 | other | Secretary | PCG-ah-27140 | - | [WTS] [JSN] | |||
PCG21_27r | other | PCG-22 | - | [WTS] [JSN] | |||||
PCG21_27r1 | Revised Summary minutes, decisions and actions from 3GPP PCG Meeting#21, Moscow, Russia, 6 October 2008 | other | Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_01r | other | PCG-22 | - | [WTS] [JSN] | |||||
PCG22_01r2 | Draft Agenda | other | Chairman | PCG-22 | - | [WTS] [JSN] | |||
PCG22_02r | other | PCG-22 | - | [WTS] [JSN] | |||||
PCG22_02r1 | List of Documents | other | Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_03 | Action Status List | other | Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_04 | TSG CT status for PCG #22 | other | Hannu Hietalahti Chairman of TSG CT | PCG-22 | - | [WTS] [JSN] | |||
PCG22_05 | TSG-RAN #42 and 43 Report to PCG ^^ | other | Old TSG RAN Chairman | PCG-22 | - | [WTS] [JSN] | |||
PCG22_06 | TSG GERAN Report to PCG # 22 | other | TSG GERAN Chairman J. Achard | PCG-22 | - | [WTS] [JSN] | |||
PCG22_07 | SA Management Report | other | Stephen Hayes TSG-SA Chair | PCG-22 | - | [WTS] [JSN] | |||
PCG22_08 | PCG Appointment of TSG Chairmen and Vice Chairmen | other | Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_09 | Revised Terms of Reference for Task Force 160 | other | Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_10 | UMTS Forum Annual Report 2008 | other | UMTS Forum | PCG-22 | - | [WTS] [JSN] | |||
PCG22_11 | UMTS Forum White Paper Mobile Broadband Evolution: the roadmap from HSPA to LTE | other | UMTS Forum | PCG-22 | - | [WTS] [JSN] | |||
PCG22_12 | MCC Activity Report | other | Adrian Scrase | PCG-22 | - | [WTS] [JSN] | |||
PCG22_13 | 3GPP Communications Plan | other | 3GPP Marketing and Communications Officer | PCG-22 | - | [WTS] [JSN] | |||
PCG22_14 | Establishment of a MARCOM Activity Review Group | other | ATIS | PCG-22 | - | [WTS] [JSN] | |||
PCG22_15 | Proposal for Way Forward and Common Text for use by OPs in supporting/endorsing 3GPP submissions in June and October of IMT Advanced to ITU-R | other | ATIS | PCG-22 | - | [WTS] [JSN] | |||
PCG22_16 | Content of 3GPP Releases 8, 9 and 10 | other | Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_17 | Work Programme changes since PCG#21 | other | Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_18 | Proposed changes to the 3GPP Working Procedures to implement the results of the analysis by the OP ad hoc group on 3GPP improvements | other | 3GPP Working Procedures Group | PCG-22 | - | [WTS] [JSN] | |||
PCG22_19 | Proposed changes to the 3GPP Working Procedures to clarify the rules for eligibility to cast votes within TSGs and their WGs | other | 3GPP Working Procedures Group | PCG-22 | - | [WTS] [JSN] | |||
PCG22_20 | Proposed changes to the 3GPP Working Procedures to align the 3GPP Purpose with that contained in the 3GPP Agreement | other | 3GPP Working Procedures Group | PCG-22 | - | [WTS] [JSN] | |||
PCG22_21 | Co-operation with the BroadBand Forum (BBF) | other | TSG SA Chairman | PCG-22 | - | [WTS] [JSN] | |||
PCG22_22 | Electronic approval of Change Requests | other | Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_23 | Proposed changes to the 3GPP Working Procedures to include the concept of Working Agreements | other | TSG leaders | PCG-22 | - | [WTS] [JSN] | |||
PCG22_24 | MRP Report to 3GPP | other | 3G Americas | PCG-22 | - | [WTS] [JSN] | |||
PCG22_25 | Proposed way forward for the LTE-Advanced submission to ITU-R, encompassing the ETSI internal discussion and the ATIS proposal contained in 3GPP/PCG#22(09)15 | other | ETSI | PCG-22 | - | [WTS] [JSN] | |||
PCG22_26 | Tools and their usage for electronic working in the 3GPP ^^Technical Specifications work | other | ETSI | PCG-22 | - | [WTS] [JSN] | |||
PCG22_27 | Liaison Statement on co-ordination of SDO input to ITU-T Q.1741.6 | other | TSG SA | PCG-22 | - | [WTS] [JSN] | |||
PCG22_28 | About the method of LTE-Advanced ITU submission | other | CCSA | PCG-22 | - | [WTS] [JSN] | |||
PCG22_29 | Actions towards Submission of Japan’s Proposal for IMT-Advanced Radio Interface Technology | other | ARIB | PCG-22 | - | [WTS] [JSN] | |||
PCG22_30r | other | PCG-22 | - | [WTS] [JSN] | |||||
PCG22_30r3 | Proposed changes to the 3GPP Working Procedures concerning the ITU liaison process | other | TSG Chairmen | PCG-22 | - | [WTS] [JSN] | |||
PCG22_31 | Overview of ARIB’s Seminar on LTE Technologies | other | ARIB | PCG-22 | - | [WTS] [JSN] | |||
PCG22_32 | GSA REPORT TO 3GPP PCG #22 | other | GSA | PCG-22 | - | [WTS] [JSN] | |||
PCG22_33 | GSA Information paper | other | GSA | PCG-22 | - | [WTS] [JSN] | |||
PCG22_34 | The Development of TD-SCDMA | other | TDIA | PCG-22 | - | [WTS] [JSN] | |||
PCG22_35 | INVITATION TO THE PCG#23 AND OP#22 MEETINGS | other | Asok Chatterjee, NAF of 3GPP | PCG-22 | - | [WTS] [JSN] | |||
PCG22_36 | Support for using the SRIT structure format in the 3GPP LTE-Advanced submission to ITU-R for IMT-Advanced | other | ATIS | PCG-22 | - | [WTS] [JSN] | |||
PCG22_37 | Femtocell Market Status and Update on Femto Forum Activities | other | Femto Forum | PCG-22 | - | [WTS] [JSN] | |||
PCG22_38 | UMTS Forum Summary of recent activities | other | Jean-Pierre Bienaimé ^^Chairman, UMTS Forum^^ | PCG-22 | - | [WTS] [JSN] | |||
PCG22_39 | LTE Mobile Broadband Ecosystem: the Global Opportunity UMTS Forum Report#42 | other | Jean-Pierre Bienaimé^^Chairman, UMTS Forum^^ | PCG-22 | - | [WTS] [JSN] | |||
PCG22_40 | Views of the SRIT Structure Of 3GPP Submission for ^^ IMT-Advanced using Option 1in Doc PCG #22 (09) 36 ^^ | other | AT&T | PCG-22 | - | [WTS] [JSN] | |||
PCG22_41 | Current Status and The Way forward for ITU-R Submission on LTE-Advanced ^^ | other | “New” TSG RAN Chairman^^ | PCG-22 | - | [WTS] [JSN] | |||
PCG22_42r | other | PCG-22 | - | [WTS] [JSN] | |||||
PCG22_42r2 | Agreed Way Forward and Common Text for use by OPs in supporting/endorsing 3GPP submissions in June and October of IMT Advanced to ITU-R | other | PCG Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_43 | Summary minutes, decisions and actions from 3GPP PCG Meeting#22, Kyoto, Japan, 27 April 2009 | other | Secretary | PCG-22 | - | [WTS] [JSN] | |||
PCG22_43r | other | PCG-23 | - | [WTS] [JSN] | |||||
PCG22_43r1 | Revised Summary minutes, decisions and actions from 3GPP PCG Meeting#22, Kyoto, Japan, 27 April 2009 | other | Secretary | PCG-23 | - | [WTS] [JSN] | |||
PCG23_01r | other | PCG-23 | - | [WTS] [JSN] | |||||
PCG23_01r2 | Draft Agenda | other | Chairman | PCG-23 | - | [WTS] [JSN] | |||
PCG23_02r | other | PCG-23 | - | [WTS] [JSN] | |||||
PCG23_02r1 | List of documents | other | Secretary | PCG-23 | - | [WTS] [JSN] | |||
PCG23_03 | Actions Status List | other | Secretary | PCG-23 | - | [WTS] [JSN] | |||
PCG23_04 | SA Management Report | other | Stephen Hayes TSG-SA Chair | PCG-23 | - | [WTS] [JSN] | |||
PCG23_05 | TSG-RAN Management Report | other | Takehiro Nakamura^^TSG-RAN Chairman^^ | PCG-23 | - | [WTS] [JSN] | |||
PCG23_06 | TSG GERAN Report to PCG #23^^ | other | TSG GERAN Chairman Andrew Howell | PCG-23 | - | [WTS] [JSN] | |||
PCG23_07 | TSG CT management report^^ | other | Hannu Hietalahti^^TSG CT chairman^^ | PCG-23 | - | [WTS] [JSN] | |||
PCG23_08 | Chairman and Vice Chairmen of 3GPP PCG | other | Secretary | PCG-23 | - | [WTS] [JSN] | |||
PCG23_09 | Chairman and Vice Chairmen of TSG GERAN | other | Secretary | PCG-23 | - | [WTS] [JSN] | |||
PCG23_10 | Content of 3GPP Releases | other | Secretary | PCG-23 | - | [WTS] [JSN] | |||
PCG23_11 | Work Programme changes since PCG#22 | other | Secretary | PCG-23 | - | [WTS] [JSN] | |||
PCG23_12 | MCC Activity Report | other | Adrian Scrase | PCG-23 | - | [WTS] [JSN] | |||
PCG23_13 | 3GPP Communications Plan | other | 3GPP Marketing and Communications Officer | PCG-23 | - | [WTS] [JSN] | |||
PCG23_14 | LTE Mobile Broadband Ecosystem: the Global Opportunity UMTS Forum Report#42 | other | UMTS Forum | PCG-23 | - | [WTS] [JSN] | |||
PCG23_15 | MRP Report to 3GPP | other | Chris Pearson^^President, 3G Americas | PCG-23 | - | [WTS] [JSN] | |||
PCG23_16 | Overview of TTA’s Workshop on LTE (LTE-Advanced) Technologies | other | TTA | PCG-23 | - | [WTS] [JSN] | |||
PCG23_17 | Future PCG and OP Meeting dates | other | Secretary | PCG-23 | - | [WTS] [JSN] | |||
PCG23_18 | Consideration on 3GPP Working Procedure | other | TTA | PCG-23 | - | [WTS] [JSN] | |||
PCG23_19 | 3GPP Presentation on LTE and LTE-Advanced | other | 3GPP TSG RAN Chairman | PCG-23 | - | [WTS] [JSN] | |||
PCG23_20 | HSPA to LTE-Advanced 3GPP broadband evolution to IMT-Advanced (4G) | other | 3G Americas | PCG-23 | - | [WTS] [JSN] | |||
PCG23_21 | LTE and Public Safety in the US | other | ATIS | PCG-23 | - | [WTS] [JSN] | |||
PCG23_22 | Femtocell Market Progress & Latest Achievements by the Femto Forum for 3GPP PCG Meeting – Denver October 2009 | other | Andy Germano^^Vice Chairman, Femto Forum^^ | PCG-23 | - | [WTS] [JSN] | |||
PCG23_23 | GSA report to 3GPP PCG #23 - Denver | other | GSA | PCG-23 | - | [WTS] [JSN] | |||
PCG23_24 | UMTS Forum Summary of Recent Activities | other | Jean-Pierre Bienaimé^^Chairman, UMTS Forum | PCG-23 | - | [WTS] [JSN] | |||
PCG23_25 | Summary minutes, decisions and actions from 3GPP PCG Meeting#23, Denver, US, 27 October 2009 | other | Secretary | PCG-23 | - | [WTS] [JSN] | |||
PCG23_25r | Revised Summary minutes, decisions and actions from 3GPP PCG Meeting#23, Denver, US, 27 October 2009 | other | Secretary | PCG-24 | - | [WTS] [JSN] | |||
PCG24_01r | other | PCG-24 | - | [WTS] [JSN] | |||||
PCG24_01r2 | Draft agenda | other | Chairman | PCG-24 | - | [WTS] [JSN] | |||
PCG24_02r | other | PCG-24 | - | [WTS] [JSN] | |||||
PCG24_02r1 | List of documents | other | Secretary | PCG-24 | - | [WTS] [JSN] | |||
PCG24_03 | Actions Status List | other | Secretary | PCG-24 | - | [WTS] [JSN] | |||
PCG24_04 | TSG CT management report^^ | other | Hannu Hietalahti^^TSG CT chairman | PCG-24 | - | [WTS] [JSN] | |||
PCG24_05r | other | PCG-24 | - | [WTS] [JSN] | |||||
PCG24_05r1 | TSG-RAN Management Report | other | Takehiro Nakamura^^TSG-RAN Chairman^^ | PCG-24 | - | [WTS] [JSN] | |||
PCG24_06 | TSG GERAN Report to PCG #24^^ | other | TSG GERAN Chairman Andrew Howell | PCG-24 | - | [WTS] [JSN] | |||
PCG24_07 | SA Management Report | other | Stephen Hayes TSG-SA Chair | PCG-24 | - | [WTS] [JSN] | |||
PCG24_08 | 3GPP Communications Plan | other | Kevin Flynn | PCG-24 | - | [WTS] [JSN] | |||
PCG24_09 | Annual report 2009 and directions for 2010 | other | UMTS Forum | PCG-24 | - | [WTS] [JSN] | |||
PCG24_10 | Voice over LTE | other | Dan Warren, Director of Technology, GSMA^^ | PCG-24 | - | [WTS] [JSN] | |||
PCG24_11 | TSG Working Procedures CR 0016 | other | PCG | PCG-24 | - | [WTS] [JSN] | |||
PCG24_12 | TSG Working Procedures CR 0017 | other | PCG | PCG-24 | - | [WTS] [JSN] | |||
PCG24_13 | TSG Working Procedures CR 0018 | other | PCG | PCG-24 | - | [WTS] [JSN] | |||
PCG24_14 | Revised Terms of Reference for Task Force 160 | other | TSG RAN | PCG-24 | - | [WTS] [JSN] | |||
PCG24_15 | Names for the 3GPP submission to ITU-R for IMT-Advanced in future ITU-R Documentation | other | ATIS | PCG-24 | - | [WTS] [JSN] | |||
PCG24_16 | Work Programme changes since PCG#23 | other | Secretary | PCG-24 | - | [WTS] [JSN] | |||
PCG24_17 | Content of 3GPP Releases | other | Secretary | PCG-24 | - | [WTS] [JSN] | |||
PCG24_18 | Working Procedures Group Report | other | Stephen Hayes WP Convener | PCG-24 | - | [WTS] [JSN] | |||
PCG24_19 | MRP Report to 3GPP | other | Chris Pearson^^President, 3G Americas^^ | PCG-24 | - | [WTS] [JSN] | |||
PCG24_20 | 3GPP LTE for TDD Spectrum in the Americas | other | 3G Americas | PCG-24 | - | [WTS] [JSN] | |||
PCG24_21 | GSM-UMTS Network migration to LTE | other | 3G Americas | PCG-24 | - | [WTS] [JSN] | |||
PCG24_22 | The benefits of SON in LTE | other | 3G Americas | PCG-24 | - | [WTS] [JSN] | |||
PCG24_23 | Release 9, release 10 and beyond: HSPA+, LTE/SAE and LTE-Advanced | other | 3G Americas | PCG-24 | - | [WTS] [JSN] | |||
PCG24_24 | Femto Forum MRP Report for 3GPP PCG #24, | other | Femto Forum | PCG-24 | - | [WTS] [JSN] | |||
PCG24_25 | TSG Working Procedures CR 0019 | other | PCG | PCG-24 | - | [WTS] [JSN] | |||
PCG24_26 | The Development of TD-SCDMA and TD-LTE | other | TDIA | PCG-24 | - | [WTS] [JSN] | |||
PCG24_27 | Consideration on Naming of IMT-Advanced Technology | other | TTA | PCG-24 | - | [WTS] [JSN] | |||
PCG24_28 | MCC Activity Report | other | Adrian Scrase | PCG-24 | - | [WTS] [JSN] | |||
PCG24_29 | LTE re-interpretation consideration | other | CCSA | PCG-24 | - | [WTS] [JSN] | |||
PCG24_30 | IPv6 The new internet | other | IPv6 Forum | PCG-24 | - | [WTS] [JSN] | |||
PCG24_31 | Next 3GPP PCG meeting in Korea | other | TTA | PCG-24 | - | [WTS] [JSN] | |||
PCG24_32 | Report to 3GPP PCG#24 | other | Alan Hadden, President GSA | PCG-24 | - | [WTS] [JSN] | |||
PCG24_33 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#24, held electronically, 21 April 2010 | other | Secretary | PCG-24 | - | [WTS] [JSN] | |||
PCG25_01r | other | PCG-25 | - | [WTS] [JSN] | |||||
PCG25_01r2 | Draft Agenda | other | Chairman | PCG-25 | - | [WTS] [JSN] | |||
PCG25_02r | other | PCG-25 | - | [WTS] [JSN] | |||||
PCG25_02r1 | List of documents | other | Secretary | PCG-25 | - | [WTS] [JSN] | |||
PCG25_03 | Actions Status List | other | Secretary | PCG-25 | - | [WTS] [JSN] | |||
PCG25_04 | TSG CT management report^^ | other | Hannu Hietalahti^^TSG CT chairman^^ | PCG-25 | - | [WTS] [JSN] | |||
PCG25_05 | TSG-RAN Management Report | other | TSG-RAN Chairman^^Takehiro Nakamura^^ | PCG-25 | - | [WTS] [JSN] | |||
PCG25_06 | TSG GERAN Report to PCG #25^^ | other | TSG GERAN Chairman Andrew Howell | PCG-25 | - | [WTS] [JSN] | |||
PCG25_07 | SA Management Report | other | Stephen Hayes TSG-SA Chair | PCG-25 | - | [WTS] [JSN] | |||
PCG25_08 | Strengths and weaknesses of “Long Term Evolution” | other | 3GPP Marketing and Communications Officer | PCG-25 | - | [WTS] [JSN] | |||
PCG25_09r | other | PCG-25 | - | [WTS] [JSN] | |||||
PCG25_09r1 | Content of 3GPP Releases | other | Secretary | PCG-25 | - | [WTS] [JSN] | |||
PCG25_10r | other | PCG-25 | - | [WTS] [JSN] | |||||
PCG25_10r1 | Work Programme changes since PCG#24 | other | Secretary | PCG-25 | - | [WTS] [JSN] | |||
PCG25_11 | Chairman and Vice Chairmen of 3GPP PCG | other | Secretary | PCG-25 | - | [WTS] [JSN] | |||
PCG25_12 | Recignizing the promise of mobile broadband | other | UMTS Forum | PCG-25 | - | [WTS] [JSN] | |||
PCG25_13 | Certification “B” submission to ITU-R by 23 March 2011 | other | ATIS | PCG-25 | - | [WTS] [JSN] | |||
PCG25_14 | Traffic Management techniques for Mobile Broadband Networks | other | 3G Americas | PCG-25 | - | [WTS] [JSN] | |||
PCG25_15 | Transition to 4G 3GPP Broadband evolution ti IMT-Advanced | other | 3G Americas | PCG-25 | - | [WTS] [JSN] | |||
PCG25_16 | MCC Activity report | other | Adrian Scrase | PCG-25 | - | [WTS] [JSN] | |||
PCG25_17 | 3GPP Communications Plan | other | 3GPP Marketing and Communications Officer | PCG-25 | - | [WTS] [JSN] | |||
PCG25_18 | MRP Report to 3GPP | other | 3G Americas | PCG-25 | - | [WTS] [JSN] | |||
PCG25_19 | CDMA Development Group PCG UPDATE | other | Sam Samra, CDG | PCG-25 | - | [WTS] [JSN] | |||
PCG25_20 | ABOUT COAI & INDIAN MOBILE INDUSTRY | other | COAI | PCG-25 | - | [WTS] [JSN] | |||
PCG25_21 | Report to 3GPP PCG #25 | other | GSA | PCG-25 | - | [WTS] [JSN] | |||
PCG25_22 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#25, held in Gyeonggi, Korea, on 27 October 2010 | other | Secretary | PCG-25 | - | [WTS] [JSN] | |||
PCG25_22r | other | PCG-26 | - | [WTS] [JSN] | |||||
PCG25_22r1 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#25, held in Gyeonggi, Korea, on 27 October 2010 | other | Secretary | PCG-26 | - | [WTS] [JSN] | |||
PCG26_01r | other | PCG-26 | - | [WTS] [JSN] | |||||
PCG26_01r2 | Draft Agenda | other | Chairman | PCG-26 | - | [WTS] [JSN] | |||
PCG26_02r | other | PCG-26 | - | [WTS] [JSN] | |||||
PCG26_02r1 | List of Documents | other | Secretary | PCG-26 | - | [WTS] [JSN] | |||
PCG26_03 | Actions Status List | other | Secretary | PCG-26 | - | [WTS] [JSN] | |||
PCG26_04 | TSG CT management report^^ | other | Hannu Hietalahti^^Retired TSG CT chairman^^ | PCG-26 | - | [WTS] [JSN] | |||
PCG26_05r | other | PCG-26 | - | [WTS] [JSN] | |||||
PCG26_05r2 | TSG-RAN Management Report | other | TSG-RAN Chairman^^Takehiro Nakamura^^NTT DCOMO, Inc^^ | PCG-26 | - | [WTS] [JSN] | |||
PCG26_06 | TSG GERAN Report to PCG #26^^ | other | TSG GERAN Chairman Andrew Howell Research in Motion UK Ltd | PCG-26 | - | [WTS] [JSN] | |||
PCG26_07 | SA Management Report | other | Stephen Hayes Ex TSG-SA Chair, Ericsson | PCG-26 | - | [WTS] [JSN] | |||
PCG26_08 | PCG Appointment of TSG Chairmen and Vice Chairmen | other | Secretary | PCG-26 | - | [WTS] [JSN] | |||
PCG26_09 | 3GPP Communications Plan | other | 3GPP Marketing and Communications Officer | PCG-26 | - | [WTS] [JSN] | |||
PCG26_10 | Content of 3GPP Releases | other | Secretary | PCG-26 | - | [WTS] [JSN] | |||
PCG26_11 | Work Programme changes since PCG#25 | other | Secretary | PCG-26 | - | [WTS] [JSN] | |||
PCG26_12 | MRP Report to 3GPP | other | Chris Pearson^^President, 4G Americas | PCG-26 | - | [WTS] [JSN] | |||
PCG26_13 | MCC Activity report | other | Adrian Scrase | PCG-26 | - | [WTS] [JSN] | |||
PCG26_14 | MCC Task Force 160^^Description and Terms of Reference for 2011^^ | other | PCG | PCG-26 | - | [WTS] [JSN] | |||
PCG26_15 | Proposal on Improvement of 3GPP Organization for ITU-R LS Activities | other | TSG-RAN Chairman^^TSG-RAN ITU-R Contact Person^^ | PCG-26 | - | [WTS] [JSN] | |||
PCG26_16 | Infocommunication Union: ^^News from Russia^^ | other | Vladislav Sorokin, ICU | PCG-26 | - | [WTS] [JSN] | |||
PCG26_17 | OMA Overview and Current Work^^ | other | Ileana Leuca, Board Vice-chair, OMA^^ | PCG-26 | - | [WTS] [JSN] | |||
PCG26_18 | Report from GSA to PCG #26^^ | other | Jonas Sundborg^^Global mobile Suppliers Association^^ | PCG-26 | - | [WTS] [JSN] | |||
PCG26_19 | Femtocell Market Update and^^Femto Forum Activities | other | Andy Germano^^Femto Forum - Vice Chairman | PCG-26 | - | [WTS] [JSN] | |||
PCG26_20 | UMTS Forum Report 43 | other | UMTS Forum | PCG-26 | - | [WTS] [JSN] | |||
PCG26_21 | Mobile traffic forecasts^^2010-2020 report^^UMTS Forum Report N° 44 | other | UMTS Forum | PCG-26 | - | [WTS] [JSN] | |||
PCG26_22 | UMTS Forum Summary of Recent Activities | other | Jean-Pierre Bienaimé^^Chairman, UMTS Forum | PCG-26 | - | [WTS] [JSN] | |||
PCG26_23 | A co-operation between 3GPP and the DVB Project on a common downlink-only standard | other | DVB | PCG-26 | - | [WTS] [JSN] | |||
PCG26_24 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#26, held in La Jolla, US, on 27 April 2011 | other | Secretary | PCG-26 | - | [WTS] [JSN] | |||
PCG26_24r | other | PCG-27 | - | [WTS] [JSN] | |||||
PCG26_24r1 | Revised Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#26, held in La Jolla, US, on 27 April 2011 | other | Secretary | PCG-27 | - | [WTS] [JSN] | |||
PCG27_01r | other | PCG-27 | - | [WTS] [JSN] | |||||
PCG27_01r3 | Draft Agenda | other | Chairman | PCG-27 | - | [WTS] [JSN] | |||
PCG27_02r | other | PCG-27 | - | [WTS] [JSN] | |||||
PCG27_02r1 | List of Documents | other | Secretary | PCG-27 | - | [WTS] [JSN] | |||
PCG27_03 | Actions Status List | other | Secretary | PCG-27 | - | [WTS] [JSN] | |||
PCG27_04 | TSG CT management report^^ | other | Atle Monrad^^TSG CT Chairman^^ | PCG-27 | - | [WTS] [JSN] | |||
PCG27_05 | TSG-RAN Management Report | other | TSG-RAN Chairman^^Takehiro Nakamura^^NTT DCOMO, Inc^^ | PCG-27 | - | [WTS] [JSN] | |||
PCG27_06 | TSG GERAN Report to PCG #27^^ | other | TSG GERAN Chairman Andrew Howell Research in Motion UK Ltd | PCG-27 | - | [WTS] [JSN] | |||
PCG27_07 | SA Management Report | other | Balazs Bertenyi Chairman of TSG-SA | PCG-27 | - | [WTS] [JSN] | |||
PCG27_08 | Chairman and Vice Chairmen of 3GPP PCG | other | Secretary | PCG-27 | - | [WTS] [JSN] | |||
PCG27_09 | 3GPP Communications plan | other | 3GPP Marketing and Communications Officer | PCG-27 | - | [WTS] [JSN] | |||
PCG27_10 | Content of 3GPP Releases | other | Secretary | PCG-27 | - | [WTS] [JSN] | |||
PCG27_11 | Work Programme changes since PCG#26 | other | Secretary | PCG-27 | - | [WTS] [JSN] | |||
PCG27_12 | MCC Activity Report | other | Adrian Scrase | PCG-27 | - | [WTS] [JSN] | |||
PCG27_13r | other | PCG-27 | - | [WTS] [JSN] | |||||
PCG27_13r1 | Report from PCG IT Improvements Ad Hoc Group | other | PCG IT Improvements Ad Hoc Group Convenor (Stephen Hayes) | PCG-27 | - | [WTS] [JSN] | |||
PCG27_14 | GSMA Activities | other | Dan Warren, Senior Director of Technology, GSMA | PCG-27 | - | [WTS] [JSN] | |||
PCG27_15 | Propose to accommodate TDD technologies in the TSG RAN Rel-11 prioritization process | other | CCSA | PCG-27 | - | [WTS] [JSN] | |||
PCG27_16 | BWA standardization in Japan | other | SoftBank | PCG-27 | - | [WTS] [JSN] | |||
PCG27_17 | NGMN Contribution to PCG#27 | other | NGMN | PCG-27 | - | [WTS] [JSN] | |||
PCG27_18 | Response to ITU-R WP5A on the Working Document towards a Preliminary Draft New Report ITU-R M.[LMS.PPDR.UHF CHANNELS] | other | TSG RAN | PCG-27 | - | [WTS] [JSN] | |||
PCG27_19 | Results of Note to 3GPP from Working Party 5D 12th Meeting (12-19 October 2011, Goa, India) | other | ITU-R Representative (Chairman WP 5D) | PCG-27 | - | [WTS] [JSN] | |||
PCG27_20r | other | PCG-27 | - | [WTS] [JSN] | |||||
PCG27_20r1 | Report to 3GPP PCG 27, Paris^^ | other | Alan Hadden, President^^GSA - Global mobile Suppliers Association^^ | PCG-27 | - | [WTS] [JSN] | |||
PCG27_21 | UMTS Forum Summary of Recent Activities 2011 | other | Jean-Pierre Bienaimé^^Chairman, UMTS Forum | PCG-27 | - | [WTS] [JSN] | |||
PCG27_22 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#27, held in Paris, France, on 24 October 2011 | other | Secretary | PCG-27 | - | [WTS] [JSN] | |||
PCG28_01r | other | PCG-28 | - | [WTS] [JSN] | |||||
PCG28_01r3 | Draft agenda | other | Chairman | PCG-28 | - | [WTS] [JSN] | |||
PCG28_02r | other | PCG-28 | - | [WTS] [JSN] | |||||
PCG28_02r02 | List of Documents | other | Secretary | PCG-28 | - | [WTS] [JSN] | |||
PCG28_03 | Actions Status List | other | Secretary | PCG-28 | - | [WTS] [JSN] | |||
PCG28_04 | TSG CT management report^^ | other | Atle Monrad^^TSG CT Chairman^^ | PCG-28 | - | [WTS] [JSN] | |||
PCG28_05r | other | PCG-28 | - | [WTS] [JSN] | |||||
PCG28_05r1 | TSG-RAN Management Report | other | TSG-RAN Chairman^^Takehiro Nakamura^^NTT DCOMO, Inc^^ | PCG-28 | - | [WTS] [JSN] | |||
PCG28_06 | TSG GERAN Report to PCG #28^^ | other | TSG GERAN Chairman Andrew Howell Research in Motion UK Ltd. | PCG-28 | - | [WTS] [JSN] | |||
PCG28_07 | SA Management Report | other | Balazs Bertenyi Chairman of TSG-SA | PCG-28 | - | [WTS] [JSN] | |||
PCG28_08 | 3GPP Communications Plan | other | 3GPP Marketing and Communications Officer | PCG-28 | - | [WTS] [JSN] | |||
PCG28_09 | Content of 3GPP Releases | other | Secretary | PCG-28 | - | [WTS] [JSN] | |||
PCG28_10 | Work Programme changes since PCG#27 | other | Secretary | PCG-28 | - | [WTS] [JSN] | |||
PCG28_11 | MCC Activity Report | other | Adrian Scrase | PCG-28 | - | [WTS] [JSN] | |||
PCG28_12 | MRP Report to 3GPP | other | Chris Pearson^^President, 4G Americas | PCG-28 | - | [WTS] [JSN] | |||
PCG28_13 | MCC Task Force 160^^Description and Terms of Reference for 2012^^ | other | PCG | PCG-28 | - | [WTS] [JSN] | |||
PCG28_14 | 3GPP preparation work for a Letter to ITU on Proposed Initial submission of updated material on LTE-Advanced toward Rev. 1 of Rec. ITU-R M.2012 | other | RAN | PCG-28 | - | [WTS] [JSN] | |||
PCG28_15 | 3GPP preparation work for a Letter to ITU on Channelization scenarios for public protection and disaster relief operations in some parts of the UHF band in accordance with Resolution 646 (WRC-03) | other | RAN | PCG-28 | - | [WTS] [JSN] | |||
PCG28_16 | LS on co-ordination of SDO input to ITU-T Q.1741.8 | other | 3GPP TSG SA | PCG-28 | - | [WTS] [JSN] | |||
PCG28_17 | LS on Working Procedures with external bodies | other | 3GPP TSG SA | PCG-28 | - | [WTS] [JSN] | |||
PCG28_18 | Reply LS on formal aspects to be considered for the 3GPP - TM Forum Joint Working Groups | other | TSG SA | PCG-28 | - | [WTS] [JSN] | |||
PCG28_19 | DRAFT - LS on Converged Management Multi-SDO activity | other | 3GPP TSG SA | PCG-28 | - | [WTS] [JSN] | |||
PCG28_20 | Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.1457-10 to Revision 11 | other | Document 5D/TEMP/406 (Revised 15 February 2012 to reflect new dates of WP 5D Meetings No. 13 & 14 and change in ITU-R Contact Point) | PCG-28 | - | [WTS] [JSN] | |||
PCG28_21 | Revised LS on Final Submission to ITU-R towards Rev.11 of Rec. ITU-R M.1457 | other | MCC | PCG-28 | - | [WTS] [JSN] | |||
PCG28_22 | Correspondence from the Asia Pacific Telecommunity (APT) Wireless Group (AWG) | LS out | Secretary | PCG-28 | - | [WTS] [JSN] | |||
PCG28_23 | LS on Proposed Initial submission of updated material on LTE-Advanced toward Rev. 1 of Rec. ITU-R M.2012 | other | TSG SA | PCG-28 | - | [WTS] [JSN] | |||
PCG28_24 | LS on Channelization scenarios for public protection and disaster relief operations in some parts of the UHF band in accordance with Resolution 646 (WRC-03) | other | TSG SA | PCG-28 | - | [WTS] [JSN] | |||
PCG28_25 | Proposed update to 3GPP PCG #28 document 014: “3GPP preparation work for a Letter to ITU on Proposed Initial submission of updated material on LTE-Advanced toward Rev. 1 of Rec. ITU-R M.2012” | other | ATIS | PCG-28 | - | [WTS] [JSN] | |||
PCG28_26 | Position on lack of September 2011 plenary output for M.1457-11 transpositions | other | ATIS | PCG-28 | - | [WTS] [JSN] | |||
PCG28_27r | other | PCG-28 | - | [WTS] [JSN] | |||||
PCG28_27r1 | NGMN Alliance Report for 3GPP PCG#28 | other | Dr. Peter Meissner^^Operating Officer^^NGMN | PCG-28 | - | [WTS] [JSN] | |||
PCG28_28 | Co-operation between 3GPP and TMF | LS out | TSG SA Chairman | PCG-28 | - | [WTS] [JSN] | |||
PCG28_29 | MRP Report to 3GPP | other | Sam Samra^^CDMA Development Group | PCG-28 | - | [WTS] [JSN] | |||
PCG28_30r | other | PCG-28 | - | [WTS] [JSN] | |||||
PCG28_30r1 | Report to 3GPP PCG #28, | other | GSA 3GPP MRP | PCG-28 | - | [WTS] [JSN] | |||
PCG28_31 | LS on Final Submission to ITU-R towards Rev.11 of Rec. ITU-R M.1457 | other | MCC | PCG-28 | - | [WTS] [JSN] | |||
PCG28_32 | Revised LS on Final Submission to ITU-R towards Rev.11 of Rec. ITU-R M.1457 | other | MCC | PCG-28 | - | [WTS] [JSN] | |||
PCG28_33r | other | PCG-28 | - | [WTS] [JSN] | |||||
PCG28_33r1 | Mapping of Documents in Agenda Item 9 of Agenda PCG28_01r2 for ITU Matters | other | ITU-R Representative | PCG-28 | - | [WTS] [JSN] | |||
PCG28_34 | UMTS Forum 2011 - 2012 Recent activities | other | Jean-Pierre Bienaimé^^Chairman, UMTS Forum | PCG-28 | - | [WTS] [JSN] | |||
PCG28_35 | An introduction to the UMTS Forum | other | UMTS Forum | PCG-28 | - | [WTS] [JSN] | |||
PCG28_36 | Spectrumfor future^^development of^^IMT-2000 and^^IMT-Advanced | other | UMTS Forum | PCG-28 | - | [WTS] [JSN] | |||
PCG28_37 | CHINA:^^THE BIGGEST INTERNET NATION^^ | other | GU Chen, BII^^ | PCG-28 | - | [WTS] [JSN] | |||
PCG28_38r | other | PCG-28 | - | [WTS] [JSN] | |||||
PCG28_38r2 | Questionnaire for 3GPP OPs on Transposition of Specifications for M.1457-11 that have no September 2011 3GPP version | other | ATIS | PCG-28 | - | [WTS] [JSN] | |||
PCG28_39r | RevisedDraft Summary minutes, decisions and actions from 3GPP PCG Meeting#28, held in Shanghai, China, on 26 April 2012 | other | S ecretary | PCG-29 | - | [WTS] [JSN] | |||
PCG29_01r | other | PCG-29 | - | [WTS] [JSN] | |||||
PCG29_01r3 | Draft Agenda | other | Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG29_02r | other | PCG-29 | - | [WTS] [JSN] | |||||
PCG29_02r2 | List of Documents | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG29_03 | Actions Status List | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG29_04 | TSG CT management report^^ | other | Atle Monrad^^TSG CT Chairman^^ | PCG-29 | - | [WTS] [JSN] | |||
PCG29_05 | TSG-RAN Management Report | other | TSG-RAN Chairman^^Takehiro Nakamura^^NTT DCOMO, Inc | PCG-29 | - | [WTS] [JSN] | |||
PCG29_06 | TSG GERAN Report to PCG #29^^ | other | TSG GERAN Chairman Andrew Howell Research in Motion UK Ltd | PCG-29 | - | [WTS] [JSN] | |||
PCG29_07 | SA Management Report | other | Balazs Bertenyi Chairman of TSG-SA | PCG-29 | - | [WTS] [JSN] | |||
PCG29_08 | Proposed contribution to ITU-R WP5D on Updated material on IMT-2000 CDMA DS & IMT-2000 CDMA TDD toward Rev 12 of Rec. ITU-R M.1457 | other | TSG RAN Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG29_09 | Proposed contribution to ITU-R WP5A (copy to ITU-R WP5D) on the review of the working document towards Revision of Rec. ITU-R M.2009 | other | TSG RAN Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG29_10 | Proposed contribution to ITU-R WP5A (copy to ITU-R WP5D) on the revision work on Rec ITU-R M.1801 and Report ITU-R M.2116 | other | TSG RAN Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG29_11 | Proposed contribution to ITU-R WP5D on the update submission on LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012, “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)” | other | TSG RAN Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG29_12 | Chairman and Vice Chairmen of 3GPP PCG | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG29_13 | Recommendated way forward for IMT-Advanced Meeting Y+2 submission to Working Party 5D | other | ATIS | PCG-29 | - | [WTS] [JSN] | |||
PCG29_14 | 3GPP Communications Plan | other | 3GPP Marketing and Communications Officer | PCG-29 | - | [WTS] [JSN] | |||
PCG29_15 | MRP Report to 3GPP | other | Chris Pearson^^President, 4G Americas | PCG-29 | - | [WTS] [JSN] | |||
PCG29_16r | other | PCG-29 | - | [WTS] [JSN] | |||||
PCG29_16r1 | Small Cell Forum Update for 3GPP PCG | other | Small Cell Forum | PCG-29 | - | [WTS] [JSN] | |||
PCG29_17 | Update to 3GPP Working Procedures Article 22 | other | Working Procedures Group | PCG-29 | - | [WTS] [JSN] | |||
PCG29_18 | MCC Activity Report | other | Adrian Scrase | PCG-29 | - | [WTS] [JSN] | |||
PCG29_19 | Content of 3GPP Releases | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG29_20 | Work Programme changes since PCG#28 | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG29_21 | Recommended way forward for future processing of M.2012 revisions | other | ATIS | PCG-29 | - | [WTS] [JSN] | |||
PCG29_22 | ATIS development of TDMA-SC content in ITU-R WP5A Recommendations | other | ATIS | PCG-29 | - | [WTS] [JSN] | |||
PCG29_23 | Timing of M.2012 and M.1457 Revisions | other | ATIS | PCG-29 | - | [WTS] [JSN] | |||
PCG29_24 | NGMN Alliance Report for 3GPP PCG#29 | other | Philipp Deibert^^Executive Programme Manager, NGMN^^ | PCG-29 | - | [WTS] [JSN] | |||
PCG29_25 | Report to 3GPP PCG #29, San Francisco | other | Jonas Sundborg^^GSA - Global mobile Suppliers Association | PCG-29 | - | [WTS] [JSN] | |||
PCG29_26 | LTE – fastest developing mobile system ever; commercial services launched on 100+ networks | other | GSA | PCG-29 | - | [WTS] [JSN] | |||
PCG29_27 | Material for submission to ITU-R Working Party 5D | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG29_28 | UMTS Forum 2012 Recent activities | other | Jean-Pierre Bienaimé^^Chairman, UMTS Forum ^^ | PCG-29 | - | [WTS] [JSN] | |||
PCG29_29 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#29, held in San Francisco, US, on 24 October 2012 | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG29_29r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG2_01 | Proposed draft agenda | other | Chairman | PCG-2 | - | [WTS] [JSN] | |||
PCG2_02 | Actions status list | other | Secretary | PCG-2 | - | [WTS] [JSN] | |||
PCG2_03r2 | 3GPP PCG meeting #2 temporary document list - Sorted by document number | other | Secretary | PCG-2 | - | [WTS] [JSN] | |||
PCG2_04 | Structure and numbering of 3GPP specification series | other | MCC | PCG-2 | - | [WTS] [JSN] | |||
PCG2_05 | Liaison from ITU-R TG 8/1 on the approval of Recommenadation IMT.RSPC and on the provision of relevant information from external organizations. | other | TSG RAN | PCG-2 | - | [WTS] [JSN] | |||
PCG2_06 | Criteria for cryptographic algorithm design process | other | TSG SA | PCG-2 | - | [WTS] [JSN] | |||
PCG2_07 | Financing Requirements for 3GPP Ciphering development work. | other | TSG SA | PCG-2 | - | [WTS] [JSN] | |||
PCG2_08 | Administration of 3GPP Support Team | other | T1 | PCG-2 | - | [WTS] [JSN] | |||
PCG2_09 | Contribution on MRP status | other | T1 | PCG-2 | - | [WTS] [JSN] | |||
PCG2_10 | Clarification required for "global roaming" and "global circulation". | other | TSG-T | PCG-2 | - | [WTS] [JSN] | |||
PCG2_11 | proposed revised working procedures. | other | Ad-hoc group on working procedures - Mr Woinsky | PCG-2 | - | [WTS] [JSN] | |||
PCG2_12 | Revised Terms of Reference for TSG RAN | other | TSG RAN | PCG-2 | - | [WTS] [JSN] | |||
PCG2_13 | Funding for 3G AMR Characterization Funding | other | TSG SA | PCG-2 | - | [WTS] [JSN] | |||
PCG2_14 | Referencing 3GPP results by the ITU | other | TSG SA | PCG-2 | - | [WTS] [JSN] | |||
PCG2_15 | Handling of the OHG recommendations | other | TSG SA | PCG-2 | - | [WTS] [JSN] | |||
PCG2_16 | Funding for USIM testing | other | TSG T | PCG-2 | - | [WTS] [JSN] | |||
PCG2_17 | Funding for 3GPP TTCN Specifications | other | TSG SA | PCG-2 | - | [WTS] [JSN] | |||
PCG2_18 | Draft Report from OP meeting#1 | other | Secretary | PCG-2 | - | [WTS] [JSN] | |||
PCG2_19r1 | Proposed changes to 3GPP Working methods CR001r1 | other | TSG SA | PCG-2 | - | [WTS] [JSN] | |||
PCG2_20r1 | Proposed changes to 3GPP Working methods CR00r2 | other | TSG SA | PCG-2 | - | [WTS] [JSN] | |||
PCG2_21 | 3GPP Status list as at June 1999 | other | MCC | PCG-2 | - | [WTS] [JSN] | |||
PCG2_22 | Global Roadmap for SMG ans SA plenary Wis after SMG#29 and SA#4. | other | MCC | PCG-2 | - | [WTS] [JSN] | |||
PCG2_23 | Proposal of classification of the release 99 Wis. | other | MCC | PCG-2 | - | [WTS] [JSN] | |||
PCG2_24 | proposed guidelines for PCG on the use of reference to 3GPP material in recommendation IMT.RSPC. | other | TSG RAN | PCG-2 | - | [WTS] [JSN] | |||
PCG2_25 | OHG Recommendations | other | Chairman | PCG-2 | - | [WTS] [JSN] | |||
PCG2_26r1 | Proposal for 3G and SMG Specification handling | other | MCC | PCG-2 | - | [WTS] [JSN] | |||
PCG2_27 | Communication received from ITU-R concerning OHG Recommendations | other | Chairman | PCG-2 | - | [WTS] [JSN] | |||
PCG2_28 | Mobile Competence center progress report | other | MCC | PCG-2 | - | [WTS] [JSN] | |||
PCG2_29 | Communication from CDMA development group | other | Chairman | PCG-2 | - | [WTS] [JSN] | |||
PCG2_30 | 3GPP handset certification in North America | other | GSM North America | PCG-2 | - | [WTS] [JSN] | |||
PCG2_31 | report to PCG#02 on work in TSG SA | other | Chairman TSG SA | PCG-2 | - | [WTS] [JSN] | |||
PCG2_32 | Management report | other | Chairman TSG_CN | PCG-2 | - | [WTS] [JSN] | |||
PCG2_33 | Management report | other | Chairman TSG_RAN | PCG-2 | - | [WTS] [JSN] | |||
PCG2_34 | 3GPP TSG-T Management report | other | TSG-T Chairman, Sang-Keun Park | PCG-2 | - | [WTS] [JSN] | |||
PCG2_35 | OHG Harmonization - Press release from FCC | other | K. Lathia | PCG-2 | - | [WTS] [JSN] | |||
PCG2_36 | Tasks of Support team in 3GPP | other | ARIB | PCG-2 | - | [WTS] [JSN] | |||
PCG2_37r1 | Proposed actions for the OHG Open letter | other | TTC | PCG-2 | - | [WTS] [JSN] | |||
PCG2_38 | High level statement on global circulation of UMTS/IMT-2000 terminals | other | UMTS Forum | PCG-2 | - | [WTS] [JSN] | |||
PCG2_39 | 3GPP endorsement for "World Mobile Technology" publication | other | Chairman | PCG-2 | - | [WTS] [JSN] | |||
PCG2_40 | SG11 chalirman's letter to 3GPPs | other | TSG-N Vice chairman (ITU-T SG-11 Q.23 rapporteur) | PCG-2 | - | [WTS] [JSN] | |||
PCG2_41 | Report to 3GPP PCG | other | Professor Michael Walker, Chairman 3GPP SA3 (Security) | PCG-2 | - | [WTS] [JSN] | |||
PCG2_42 | Participants list | other | PCG | PCG-2 | - | [WTS] [JSN] | |||
PCG30_01r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG30_02r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG30_03 | Actions Status List | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG30_04 | TSG CT Management Report | other | TSG CT Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG30_05r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG30_06 | TSG GERAN Management Report | other | TSG GERAN Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG30_07 | TSG SA Management Report | other | TSG SA Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG30_08 | 3GPP Communications Plan | other | 3GPP Marcomms Officer | PCG-29 | - | [WTS] [JSN] | |||
PCG30_09r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG30_10 | Content of 3GPP Releases | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG30_11r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG30_12 | PCG Appointment of TSG Chairmen and Vice Chairmen | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG30_13 | MCC Activity Report | other | Secretary | PCG-29 | - | [WTS] [JSN] | |||
PCG30_14 | MCC Task Force 160 Description and Terms of Reference for 2013 | other | TSG RAN Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG30_15 | 3GPP internal LS on the completion of the submission of LTE-Advanced toward Revision 1 of Rec. ITU-R M.2012, “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)” | other | TSG RAN Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG30_16 | LS on Development of a reply to ITU-R WP5D On Attachment 5.18 to Document 5D/300 (Document 3GPP RP-130354) on IMT-2000 UPDATES OF RECOMMENDATION ITU-R M.1457… | other | TSG RAN Chairman | PCG-29 | - | [WTS] [JSN] | |||
PCG30_17 | IT Improvements Ad-Hoc #2 Report | other | IT Improvements Ad Hoc Group Convenor | PCG-29 | - | [WTS] [JSN] | |||
PCG30_18 | Addendum to IT Improvements Report – 2013 v1.1 | other | IT Improvements Ad Hoc Group | PCG-29 | - | [WTS] [JSN] | |||
PCG30_19 | MRP Report to 3GPP PCG | other | 4G Americas | PCG-29 | - | [WTS] [JSN] | |||
PCG30_20r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG30_21 | 3GPP Marcoms | other | 3GPP Marcomms Officer | PCG-29 | - | [WTS] [JSN] | |||
PCG30_22 | LTE Branding | other | 3GPP Marcomms Officer | PCG-29 | - | [WTS] [JSN] | |||
PCG30_23r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG30_24r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG30_25 | UMTS Forum snapshot on recent activities | other | UMTS Forum | PCG-29 | - | [WTS] [JSN] | |||
PCG30_26 | GSMA Activities Update to 3GPP/PCG#30 | other | GSMA | PCG-29 | - | [WTS] [JSN] | |||
PCG30_27r | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG30_28 | other | PCG-30 | - | [WTS] [JSN] | |||||
PCG31_01r | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_02r | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_03 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_04 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_05 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_06 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_07 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_08 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_09 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_10 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_11 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_12 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_13 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_14 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_15 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_16 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_17 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_18 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_19 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_20 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_21 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_22 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_23 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_24 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_25 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_26 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_27 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_28 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_29 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_30 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_31 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_32 | other | PCG-31 | - | [WTS] [JSN] | |||||
PCG31_32r | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_01r | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_02r | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_03 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_04 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_05 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_06 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_07 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_08r | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_09 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_10 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_11 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_12 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_13 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_14 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_15 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_16 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_17 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_18 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_19 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_20 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_21 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_22 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_23 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_24 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_25 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_26 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_27 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_28 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_29 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_30 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_31 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_32 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_33 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_34 | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG32_35r | other | PCG-32 | - | [WTS] [JSN] | |||||
PCG36_01 | Draft Agenda | agenda | Chairman |
PCG-36 AI: 2 |
available | [WTS] [JSN] | |||
PCG36_03 | Status of Actions | other | Secretary |
PCG-36 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG36_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-36 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG36_05 | Report from TSG RAN | report | TSG RAN Chairman |
PCG-36 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG36_06 | Report from TSG GERAN | report | TSG GERAN Chairman |
PCG-36 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG36_07 | Report from TSG SA | report | TSG SA Chairman |
PCG-36 AI: 4.4 |
available | [WTS] [JSN] | |||
PCG36_08 | Draft Letter to ITU on final submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 13 of Rec. ITU-R M.1457 |
response revised to PCG36_10 |
TSG SA |
PCG-36 AI: 9 |
revised | [WTS] [JSN] | |||
PCG36_09 | Draft Letter to ITU in answer to ITU-R WP5D Liaison statement to GCS Proponents of IMT-Advanced related to the revision of Recommendations for generic unwanted emission characteristics | response | TSG SA |
PCG-36 AI: 9 |
approved | [WTS] [JSN] | |||
PCG36_10 | Draft Letter to ITU on final submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 13 of Rec. ITU-R M.1457 |
response revision of PCG36_08 |
TSG SA |
PCG-36 AI: 9 |
approved | [WTS] [JSN] | |||
PCG36_11 | DRAFT LTI on Proposed Initial submission of updated material on LTE-Advanced toward Rev. 3 of Rec. ITU-R M.2012 | response | TSG SA |
PCG-36 AI: 9 |
approved | [WTS] [JSN] | |||
PCG36_12 | Draft LTI on the standardization status of Intelligent Transport Systems (ITS) radio interface technologies | response | TSG SA |
PCG-36 AI: 9 |
approved | [WTS] [JSN] | |||
PCG36_13 | SA3 LI MCC Support Request | other | TSG SA Chairman |
PCG-36 AI: 7 |
available | [WTS] [JSN] | |||
PCG36_14 | MCC Task Force 160 (TF160) Description and Terms of Reference for 2016 | ToR | TSG RAN Chairman |
PCG-36 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG36_15 | New TSG RAN Terms of Reference | ToR | TSG RAN and TSG GERAN Chairmen |
PCG-36 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG36_16 | Marketing and Communications Report | report | 3GPP Marketing and Communications Officer |
PCG-36 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG36_17 | Proposal for 5G naming |
other revised to PCG36_26 |
3GPP Marketing and Communications Officer |
PCG-36 AI: 7.2 |
revised | [WTS] [JSN] | |||
PCG36_18 | MCC Activity Report | report | MCC |
PCG-36 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG36_19 | 5G Americas MRP Report to 3GPP | report | 5G Americas |
PCG-36 AI: 10 |
available | [WTS] [JSN] | |||
PCG36_20 | 4G Americas NFV and SDN Networks White Paper | other | 4G Americas |
PCG-36 AI: 10 |
available | [WTS] [JSN] | |||
PCG36_21 | 4G Americas LTE Aggregation & Unlicensed Spectrum White Paper | other | 4G Americas |
PCG-36 AI: 10 |
available | [WTS] [JSN] | |||
PCG36_22 | 4G Americas 5G Technology Evolution Recommendations | other | 4G Americas |
PCG-36 AI: 10 |
available | [WTS] [JSN] | |||
PCG36_23 | Appreciation for the completion of 3GPP Rel-13 Specifications related to the LTE for Public Safety | other | Korean Ministry of Science, ICT and Future Planning |
PCG-36 AI: 11 |
available | [WTS] [JSN] | |||
PCG36_24 | Work Programme changes since PCG#35 (October 2015) | Work Plan | Work Programme Coordinator |
PCG-36 AI: 6 |
available | [WTS] [JSN] | |||
PCG36_25 | Content of 3GPP Releases | Work Plan | Work Programme Coordinator |
PCG-36 AI: 5 |
available | [WTS] [JSN] | |||
PCG36_26 | Proposal for 5G naming |
other revision of PCG36_17 |
3GPP Marketing and Communications Officer |
PCG-36 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG36_27 | COAI MRP Report to PCG | report | COAI |
PCG-36 AI: 10 |
available | [WTS] [JSN] | |||
PCG36_28 | NGMN Alliance Update | report | NGMN Alliance |
PCG-36 AI: 10 |
available | [WTS] [JSN] | |||
PCG36_29 | UMTS Forum market view - _x00B_Presentation to 3GPP/PCG | report | UMTS Forum |
PCG-36 AI: 10 |
available | [WTS] [JSN] | |||
PCG36_30 | GSA report to 3GPP PCG #36 | report | GSA |
PCG-36 AI: 10 |
available | [WTS] [JSN] | |||
PCG36_31 | Proposed PCG Working Hour Guidance |
other revised to PCG36_32 |
TSG SA Chairman |
PCG-36 AI: 7.1 |
revised | [WTS] [JSN] | |||
PCG36_32 | Proposed PCG Working Hour Guidance |
other revision of PCG36_31 |
TSG SA Chairman |
PCG-36 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG37_01 | Draft Agenda | agenda | Secretary |
PCG-37 AI: 2 |
available | [WTS] [JSN] | |||
PCG37_02 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#36, held in Delhi, India, on 28 October 2016 |
report revised to PCG37_19 |
Secretary |
PCG-37 AI: 3 |
revised | [WTS] [JSN] | |||
PCG37_03 | Status of Actions | other | Secretary |
PCG-37 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG37_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-37 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG37_05 | Report from TSG RAN |
report revised to PCG37_33 |
TSG RAN Chairman |
PCG-37 AI: 4.2 |
revised | [WTS] [JSN] | |||
PCG37_07 | Report from TSG SA | report | TSG SA Chairman |
PCG-37 AI: 4.4 |
available | [WTS] [JSN] | |||
PCG37_08 | DRAFT LTI on Work towards revision 1 of Recommendations ITU-R M.2070 and M.2071 - Questions for clarification within 3GPP specifications | LS out | TSG SA |
PCG-37 AI: 9 |
approved | [WTS] [JSN] | |||
PCG37_09 | Draft LTI on Revision of Report ITU-R M.2291 | LS out | TSG SA |
PCG-37 AI: 9 |
approved | [WTS] [JSN] | |||
PCG37_10 | 5G Naming - Way Forward | other | 3GPP Marcoms Officer |
PCG-37 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG37_11 | Draft reply letter to ITU-R WP5D in reply to ITU-R WP1A/TEMP/100 = RP-151138 on Report ITU-R SM.[SMART_GRID] on the Smart Grid project [SP-160507] | LS out | TSG SA |
PCG-37 AI: 9 |
approved | [WTS] [JSN] | |||
PCG37_12 | DRAFT Letter to ITU on Update submission for LTE-Advanced toward Rev. 3 of Rec. ITU-R M.2012 | LS out | TSG SA |
PCG-37 AI: 9 |
approved | [WTS] [JSN] | |||
PCG37_13 | LTI on Work towards revision 1 of Recommendations ITU-R M.2070 and M.2071 - Questions for clarification within 3GPP specifications | LS out | TSG SA |
PCG-37 AI: 9 |
approved | [WTS] [JSN] | |||
PCG37_14 | Recommended Changes to Working Procedures for Mandatory Antitrust Training | other | Working Procedures Group Chairman |
PCG-37 AI: 8 |
available | [WTS] [JSN] | |||
PCG37_15 | Chairman and Vice Chairmen of 3GPP PCG | other | Secretary |
PCG-37 AI: 12 |
available | [WTS] [JSN] | |||
PCG37_16 | Draft LTI on Technical and operational characteristics and implementation of railway radiocommunication systems between train and trackside associated with work on WRC-19 agenda item 1.11 | response | TSG SA |
PCG-37 AI: 9 |
available | [WTS] [JSN] | |||
PCG37_17 | Draft LTI on Technical and operational characteristics of digital land mobile communication systems for specific applications | response | TSG SA |
PCG-37 AI: 9 |
available | [WTS] [JSN] | |||
PCG37_18 | LS on Copyright issues with OMA CPM specifications | LS out | TSG SA |
PCG-37 AI: 4.4 |
available | [WTS] [JSN] | |||
PCG37_19 | Draft Summary minutes, decisions and actions from 3GPP PCG Meeting#36, held in Delhi, India, on 28 April 2016 |
report revision of PCG37_02 |
Secretary |
PCG-37 AI: 3 |
available | [WTS] [JSN] | |||
PCG37_20 | IEEE 802.11 Working Group Liaison on the role of WLAN in IMT-2020 | LS in | TSG SA |
PCG-37 AI: 4.4 |
available | [WTS] [JSN] | |||
PCG37_21 | 5G naming – Steering Group Input | other | 3GPP Marketing and Communications Officer |
PCG-37 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG37_22 | Information on new XGP standardization activity | other | SoftBank Corp |
PCG-37 AI: 13 |
available | [WTS] [JSN] | |||
PCG37_23 | Content of open 3GPP Releases | other | 3GPP Work Plan Coordinator |
PCG-37 AI: 5 |
available | [WTS] [JSN] | |||
PCG37_24 | Work Programme changes since PCG#36 | Work Plan | Work Programme Coordinator |
PCG-37 AI: 6 |
available | [WTS] [JSN] | |||
PCG37_25 | Proposed PCG Response to IEEE 802.11 LS |
LS out revised to PCG37_35, PCG37_40 |
ATIS |
PCG-37 AI: 4.4 |
revised | [WTS] [JSN] | |||
PCG37_26 | Consistency in OP Transpositions | other | ATIS |
PCG-37 AI: 9 |
available | [WTS] [JSN] | |||
PCG37_27 | Duration and Efficiencies of Technical Meetings | other | ATIS |
PCG-37 AI: 13 |
available | [WTS] [JSN] | |||
PCG37_28 | MCC Report to PCG | report | MCC |
PCG-37 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG37_29 | 5G Americas Report to PCG | report | 5G Americas |
PCG-37 AI: 10 |
available | [WTS] [JSN] | |||
PCG37_30 | Inside 3GPP Release 13 - 2016 Update | other | 5G Americas |
PCG-37 AI: 10 |
available | [WTS] [JSN] | |||
PCG37_31 | Mobile Broadband Transformation: LTE to 5G | other | 5G Americas |
PCG-37 AI: 10 |
available | [WTS] [JSN] | |||
PCG37_32 | Collaboration Proposal | LS in | IEEE 802 Local and Metropolitan Area Network Standards Committee |
PCG-37 AI: 11 |
available | [WTS] [JSN] | |||
PCG37_33 | Report from TSG RAN |
report revision of PCG37_05 |
TSG RAN Chairman |
PCG-37 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG37_34 | Marketing and Communications Report | report | 3GPP Marketing and Communications Officer |
PCG-37 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG37_35 | Proposed PCG Response to IEEE 802.11 LS |
LS out revision of PCG37_25 |
ATIS |
PCG-37 AI: 4.4 |
available | [WTS] [JSN] | |||
PCG37_36 | A brief update from TCCA | other | TCCA |
PCG-37 AI: 10 |
available | [WTS] [JSN] | |||
PCG37_37 | NGMN Alliance update | other | NGMN Alliance |
PCG-37 AI: 10 |
available | [WTS] [JSN] | |||
PCG37_38 | GSA Report to PCG#37 | other | GSA |
PCG-37 AI: 10 |
available | [WTS] [JSN] | |||
PCG37_39 | LS on LTE-based vehicle-to-vehicle communications | LS out | 3GPP PCG |
PCG-37 AI: 10 |
available | [WTS] [JSN] | |||
PCG37_40 | Proposed PCG Response to IEEE 802.11 LS |
LS out revision of PCG37_25 |
PCG |
PCG-37 AI: 4.4 |
available | [WTS] [JSN] | |||
PCG37_41 | UMTS Forum market view: presentation to 3GPP PCG | other | UMTS Forum |
PCG-37 AI: 10 |
available | [WTS] [JSN] | |||
PCG38_01 | Draft Agenda | agenda | Secretary |
PCG-38 AI: 2 |
available | [WTS] [JSN] | |||
PCG38_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#37, held in London, UK, on 20 October 2016 | report | Secretary |
PCG-38 AI: 3 |
available | [WTS] [JSN] | |||
PCG38_03 | Status of Actions | other | Secretary |
PCG-38 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG38_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-38 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG38_05 | Report from TSG RAN |
report revised to PCG38_35 |
TSG RAN Chairman |
PCG-38 AI: 4.2 |
revised | [WTS] [JSN] | |||
PCG38_06 | Report from TSG SA |
report revised to PCG38_31 |
TSG SA Chairman |
PCG-38 AI: 4.3 |
revised | [WTS] [JSN] | |||
PCG38_07 | DRAFT Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 3 of Rec. ITU-R M.2012, “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)” | response | TSG SA |
PCG-38 AI: 10 |
approved | [WTS] [JSN] | |||
PCG38_08 | NGMN Recommendations regarding the Transparency of SEP Disclosures | other | NGMN Alliance Project P3 – IPR Forum |
PCG-38 AI: 12 |
available | [WTS] [JSN] | |||
PCG38_09 | PCG Appointment of TSG Chairmen and Vice Chairmen | other | Secretary |
PCG-38 AI: 5 |
available | [WTS] [JSN] | |||
PCG38_10 | Draft LTI on LS on preliminary draft revision of Report ITU-R SM.2351-1 on Smart grid utility management systems [SP170-264] | other | TSG SA |
PCG-38 AI: 10 |
approved | [WTS] [JSN] | |||
PCG38_11 | Draft LTI on LS on Further information on the invitation for submission of proposals for candidate radio interface technologies for the terrestrial components of the radio interface(s) for IMT-2020 and invitation to participate in their subsequent evaluation [SP-170265] | other | TSG SA |
PCG-38 AI: 10 |
approved | [WTS] [JSN] | |||
PCG38_12 | Draft LTI on LS on the schedule for updating recommendation ITU-R M.1457 to revision 14 [SP-170266] | other | TSG SA |
PCG-38 AI: 10 |
approved | [WTS] [JSN] | |||
PCG38_13 | Draft LTI on Intelligent Transport Systems (ITS) [SP-170267] | other | TSG SA |
PCG-38 AI: 10 |
approved | [WTS] [JSN] | |||
PCG38_14 | Draft LTI on LS on Invitation to consider integration of satellite-based solutions into IMT-2020 networks [SP-170268] | other | TSG SA |
PCG-38 AI: 10 |
approved | [WTS] [JSN] | |||
PCG38_15 | Draft LTI on Intelligent Transport Systems (ITS) [SP-170281] | other | TSG SA |
PCG-38 AI: 10 |
approved | [WTS] [JSN] | |||
PCG38_16 | Draft LTI on LS on Invitation to consider integration of satellite-based solutions into IMT-2020 networks [SP-170282] | other | TSG SA |
PCG-38 AI: 10 |
approved | [WTS] [JSN] | |||
PCG38_17 | Reply LS on recent work by JCA-IoT and SC&C [SP-170273] | other | TSG SA |
PCG-38 AI: 10 |
approved | [WTS] [JSN] | |||
PCG38_18 | SA3 LI MCC Support Request | other | TSG SA Chairman |
PCG-38 AI: 8 |
available | [WTS] [JSN] | |||
PCG38_19 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-38 AI: 8.2 |
available | [WTS] [JSN] | |||
PCG38_20 | MCC Report to PCG | report | Secretary |
PCG-38 AI: 8.1 |
available | [WTS] [JSN] | |||
PCG38_21 | Proposal to increase MCC resources | other | Secretary |
PCG-38 AI: 8.1 |
available | [WTS] [JSN] | |||
PCG38_22 | The 3GPP Lifetime Achievement Award | other | TSG SA Chairman. Marketing and Communications Officer |
PCG-38 AI: 8.2 |
available | [WTS] [JSN] | |||
PCG38_23 | Transpositions Process | other | ATIS |
PCG-38 AI: 9 |
available | [WTS] [JSN] | |||
PCG38_24 | Content of open 3GPP Releases | Work Plan | 3GPP Work Plan Coordinator |
PCG-38 AI: 6 |
available | [WTS] [JSN] | |||
PCG38_25 | Work Programme changes since PCG#37 (October 2016) | Work Plan | Work Programme Coordinator |
PCG-38 AI: 7 |
available | [WTS] [JSN] | |||
PCG38_26 | 5G Americas MRP Report | report | 5G Americas |
PCG-38 AI: 11 |
available | [WTS] [JSN] | |||
PCG38_27 | Wireless Technology Evolution Towards 5G: 3GPP Release 13 to Release 15 and beyond | other | 5G Americas |
PCG-38 AI: 11 |
available | [WTS] [JSN] | |||
PCG38_28 | Change of Hosting Guidelines | other | TSG CT Chairman |
PCG-38 AI: 13 |
available | [WTS] [JSN] | |||
PCG38_29 | Considerations on 3GPP meeting venues | other | CCSA |
PCG-38 AI: 13 |
available | [WTS] [JSN] | |||
PCG38_30 | MCC Task Force 160 (TF160) Description and Terms of Reference for 2017 | other | TSG RAN |
PCG-38 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG38_31 | Report from TSG SA |
report revision of PCG38_06 |
TSG SA Chairman |
PCG-38 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG38_32 | NGMN Alliance Update |
report revised to PCG38_36 |
NGMN Alliance |
PCG-38 AI: 11 |
revised | [WTS] [JSN] | |||
PCG38_33 | NGMN 5G IPR Forum_x00B_Standards Essential Patents, Recommendations for Declarations | other | NGMN |
PCG-38 AI: 12 |
available | [WTS] [JSN] | |||
PCG38_34 | On Cellular IoT Evolution of NB-IoT and eMTC | other | CCSA |
PCG-38 AI: 6 |
available | [WTS] [JSN] | |||
PCG38_35 | Report from TSG RAN |
report revision of PCG38_05 |
TSG RAN Chairman |
PCG-38 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG38_36 | NGMN Alliance Update |
report revision of PCG38_32 |
NGMN Alliance |
PCG-38 AI: 11 |
available | [WTS] [JSN] | |||
PCG38_37 | The views of Europe: 5GPPP/5G IA Activities |
other revised to PCG38_40 |
5G IA |
PCG-38 AI: 11 |
revised | [WTS] [JSN] | |||
PCG38_38 | Report to PCG#38 | other | Global mobile Suppliers Association |
PCG-38 AI: 11 |
available | [WTS] [JSN] | |||
PCG38_39 | Copyright Release Query to OMA | other | TSG SA Chairman |
PCG-38 AI: 7 |
available | [WTS] [JSN] | |||
PCG38_40 | The views of Europe: 5GPPP/5G IA Activities |
other revision of PCG38_37 |
5G IA |
PCG-38 AI: 11 |
available | [WTS] [JSN] | |||
PCG39_01 | Draft Agenda | agenda | Secretary |
PCG-39 AI: 2 |
available | [WTS] [JSN] | |||
PCG39_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#38, held in West Palm Beach, Florida, US, on 25 April 2017 | report | Secretary |
PCG-39 AI: 3 |
available | [WTS] [JSN] | |||
PCG39_03 | Status of Actions | other | Secretary |
PCG-39 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG39_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-39 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG39_05 | Report from TSG RAN | report | TSG RAN Chairman |
PCG-39 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG39_06 | Report from TSG SA | report | TSG SA Chairman |
PCG-39 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG39_07 | Chairman and Vice Chairmen of 3GPP PCG | other | Secretary |
PCG-39 AI: 12 |
available | [WTS] [JSN] | |||
PCG39_08 | MCC Report to PCG | report | Secretary |
PCG-39 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG39_09 | Presentation to 3GPP PCG on GCF’s readiness for 5G |
other revised to PCG39_22 |
GCF |
PCG-39 AI: 10 |
revised | [WTS] [JSN] | |||
PCG39_10 | NGMN Alliance Update | other | NGMN |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_11 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-39 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG39_12 | TCCA MRP update | other | TCCA |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_13 | DRAFT LTI on LS on the schedule for updating recommendation ITU-R M.1457 to revision 14 [SP-170804] | other | TSG SA |
PCG-39 AI: 9 |
available | [WTS] [JSN] | |||
PCG39_14 | Draft LTI on Liaison statement to external organizations on the revision of Recommendation ITU-R M.2084-0 [SP-170805] | other | TSG SA |
PCG-39 AI: 9 |
available | [WTS] [JSN] | |||
PCG39_15 | Content of open 3GPP Releases | other | 3GPP Work Plan Coordinator |
PCG-39 AI: 5 |
available | [WTS] [JSN] | |||
PCG39_16 | Work Programme changes since PCG#38 (April 2017) | Work Plan | Work Programme Coordinator |
PCG-39 AI: 6 |
available | [WTS] [JSN] | |||
PCG39_17 | 5G Transpositions Timeline | other | ATIS |
PCG-39 AI: 9 |
available | [WTS] [JSN] | |||
PCG39_18 | 3GPP MRP Report | other | 5G Americas |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_19 | 5G Spectrum Recommendations | other | 5G Americas |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_20 | 5G Regulatory Policy Considerations and Spectrum Sharing | other | 5G Americas |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_21 | 5G Activities in TTA | other | TTA |
PCG-39 AI: 13 |
available | [WTS] [JSN] | |||
PCG39_22 | Presentation to 3GPP PCG on GCF’s readiness for 5G |
other revision of PCG39_09 revised to PCG39_29 |
GCF |
PCG-39 AI: 10 |
revised | [WTS] [JSN] | |||
PCG39_23 | GSMA Update | other | GSMA |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_24 | Proposed LTE-M Technology Industry Identity | other | GSMA |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_25 | PSC Europe MRP Report | other | PSCE |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_26 | The Specification Transposition Process | other | MCC |
PCG-39 AI: 9 |
available | [WTS] [JSN] | |||
PCG39_27 | The views of Europe: 5GPPP/5G IA Activities |
other revised to PCG39_30 |
5G IA |
PCG-39 AI: 10 |
revised | [WTS] [JSN] | |||
PCG39_28 | GSA MRP Report | other | GSA |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_29 | Presentation to 3GPP PCG on GCF’s readiness for 5G |
other revision of PCG39_22 |
GCF |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG39_30 | The views of Europe: 5GPPP/5G IA Activities |
other revision of PCG39_27 |
5G IA |
PCG-39 AI: 10 |
available | [WTS] [JSN] | |||
PCG3_01r1 | Proposed draft agenda | other | Chairman | PCG-3 | - | [WTS] [JSN] | |||
PCG3_02 | Actions status list | other | Secretary | PCG-3 | - | [WTS] [JSN] | |||
PCG3_03r2 | List of documents | other | Secretary | PCG-3 | - | [WTS] [JSN] | |||
PCG3_04 | Summary of project funding requests from TSG T | other | TSG-T | PCG-3 | - | [WTS] [JSN] | |||
PCG3_05r1 | 1999 results from 3GPP | other | OP meeting | PCG-3 | - | [WTS] [JSN] | |||
PCG3_06 | Funding for 3G AMR Characterization Funding | other | TSG SA | PCG-3 | - | [WTS] [JSN] | |||
PCG3_07 | 3G UE test description for Release 99 | other | TSG T | PCG-3 | - | [WTS] [JSN] | |||
PCG3_08 | 3GPP TTCN specifications | other | TSG T | PCG-3 | - | [WTS] [JSN] | |||
PCG3_09 | 3GPP TSG-T Management report | other | TSG-T Chairman, Sang-Keun Park | PCG-3 | - | [WTS] [JSN] | |||
PCG3_10r1 | Attendees list | other | PCG | PCG-3 | - | [WTS] [JSN] | |||
PCG3_11 | Request for funding of USIM testing | other | TSG T | PCG-3 | - | [WTS] [JSN] | |||
PCG3_12 | Common mobile telecommunications smart card standard | other | 2G/3G SIM, USIM & R-UIM officials meeting | PCG-3 | - | [WTS] [JSN] | |||
PCG3_13 | Summary of Mobile Competence Centre specific tasks budget for 2000 | other | OP meeting | PCG-3 | - | [WTS] [JSN] | |||
PCG3_14 | TSG RAN Management report | other | Yuki Furuya, TSG RAN chairman, NEC | PCG-3 | - | [WTS] [JSN] | |||
PCG3_15 | Report to PCG#03 on work in TSG SA | other | Chairman TSG SA | PCG-3 | - | [WTS] [JSN] | |||
PCG3_16 | Management report | other | Chairman TSG-CN | PCG-3 | - | [WTS] [JSN] | |||
PCG3_17 | MRP High level objectives | other | 3GPP MRPs: GSA, GSM Association, UMTS Forum, UWCC | PCG-3 | - | [WTS] [JSN] | |||
PCG3_18 | Liaison Statement on UMTS release 2000 | other | UMTS Forum | PCG-3 | - | [WTS] [JSN] | |||
PCG3_19 | Certification and Global circulation | other | 3GPP MRPs: GSA, GSM Association, UMTS Forum, UWCC | PCG-3 | - | [WTS] [JSN] | |||
PCG3_20 | Support for proposal to include EDGE/GPRS as 3GPP programs | other | UWCC | PCG-3 | - | [WTS] [JSN] | |||
PCG3_21 | MRP input to 3GPP program planning | other | GSA, GSMA, UMTS Forum and UWCC | PCG-3 | - | [WTS] [JSN] | |||
PCG3_22 | Terms of Reference of the USIM Testing Task Team | other | T3 chairman and T3 Secretary | PCG-3 | - | [WTS] [JSN] | |||
PCG3_23 | Co-ordination of 2G/3G smart card standardisation work | other | T3 chairman | PCG-3 | - | [WTS] [JSN] | |||
PCG3_24 | OP#2 decisions on funding | other | Secretary | PCG-3 | - | [WTS] [JSN] | |||
PCG3_25 | ETSI Mobile Competence Centre presentation to PCG#3 | other | Adrian Scrase, head of MCC | PCG-3 | - | [WTS] [JSN] | |||
PCG3_26 | Open issues for release 99 list | other | PCG | PCG-3 | - | [WTS] [JSN] | |||
PCG3_27r1 | terms of reference for proposed Inclusion of EDGE/GPRS as 3GPP work program(s) | other | 3GPP ad-hoc group on EDGE/GPRS | PCG-3 | - | [WTS] [JSN] | |||
PCG40_01 | Draft Agenda | agenda | Secretary |
PCG-40 AI: 2 |
available | [WTS] [JSN] | |||
PCG40_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#39, held in Vienna, Austria, on 28 September 2017 | report | Secretary |
PCG-40 AI: 3 |
available | [WTS] [JSN] | |||
PCG40_03 | Status of Actions | other | Secretary |
PCG-40 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG40_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-40 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG40_05 | Report from TSG RAN | report | TSG RAN Chairman |
PCG-40 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG40_06 | Report from TSG SA | report | TSG SA Chairman |
PCG-40 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG40_07 | DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2012 to Revision 4 | response | TSG RAN |
PCG-40 AI: 9 |
approved | [WTS] [JSN] | |||
PCG40_08 | Draft LTI on 3GPP 5G Initial Description Template |
response revised to PCG40_11 |
TSG RAN |
PCG-40 AI: 9 |
revised | [WTS] [JSN] | |||
PCG40_09 | DRAFT Letter to ITU on final submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 14 of Rec. ITU-R M.1457 | response | TSG RAN |
PCG-40 AI: 9 |
approved | [WTS] [JSN] | |||
PCG40_10 | DRAFT LTI on Liaison statement to External Organizations on the Revision of the Recommendation ITU-R M.2084-0 | response | TSG RAN |
PCG-40 AI: 9 |
available | [WTS] [JSN] | |||
PCG40_11 | Draft LTI on 3GPP 5G Initial Description Template |
response revision of PCG40_08 |
TSG RAN |
PCG-40 AI: 9 |
approved | [WTS] [JSN] | |||
PCG40_12 | Correspondence from EC Commissioner Gabriel | response | Secretary |
PCG-40 AI: 11 |
available | [WTS] [JSN] | |||
PCG40_13 | MCC Activity Report | report | MCC |
PCG-40 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG40_14 | Marketing and Communications Report | report | 3GPP Marketing and Communications Officer |
PCG-40 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG40_15 | MRP update from TCCA | report | TCCA |
PCG-40 AI: 10 |
available | [WTS] [JSN] | |||
PCG40_16 | DRAFT Letter to ITU on IMT-2020 in support of PPDR [SP-180244] | other | TSG SA |
PCG-40 AI: 9 |
available | [WTS] [JSN] | |||
PCG40_17 | DRAFT Letter to ITU on Update submission for LTE-Advanced toward Rev. 4 of Rec. ITU-R M.2012 [SP-180245] | other | TSG SA |
PCG-40 AI: 9 |
available | [WTS] [JSN] | |||
PCG40_18 | Letter to ITU on 3GPP IMT-2020 Self-evaluation [SP-180248] | other | TSG SA |
PCG-40 AI: 9 |
available | [WTS] [JSN] | |||
PCG40_19 | Content of open 3GPP Releases | other | 3GPP Work Plan Coordinator |
PCG-40 AI: 5 |
available | [WTS] [JSN] | |||
PCG40_20 | Work Programme changes since PCG#39 (September 2017) | Work Plan | 3GPP Work Plan Coordinator |
PCG-40 AI: 6 |
available | [WTS] [JSN] | |||
PCG40_21 | Approaching 5G in China | other | CCSA |
PCG-40 AI: 12 |
available | [WTS] [JSN] | |||
PCG40_22 | 3GPP MRP Report | report | 5G Americas |
PCG-40 AI: 10 |
available | [WTS] [JSN] | |||
PCG40_23 | LTE Progress Leading to 5G Massive Internet of Things | other | 5G Americas |
PCG-40 AI: 10 |
available | [WTS] [JSN] | |||
PCG40_24 | 5G Americas Whitepaper - Spectrum Landscape for Mobile Services | other | 5G Americas |
PCG-40 AI: 10 |
available | [WTS] [JSN] | |||
PCG40_25 | 5G Americas Whitepaper - Cellular V2X Communications Towards 5G | other | 5G Americas |
PCG-40 AI: 10 |
available | [WTS] [JSN] | |||
PCG40_26 | IT Improvements Report | report | Stephen Hayes, IT Improvements Convenor |
PCG-40 AI: 8 |
available | [WTS] [JSN] | |||
PCG40_27 | NGMN Alliance Update | other | NGMN |
PCG-40 AI: 10 |
available | [WTS] [JSN] | |||
PCG40_28 | 3GPP updates of Rec. ITU-R M.1457 | other | 3GPP TSG RAN ITU Coordinator |
PCG-40 AI: 9 |
available | [WTS] [JSN] | |||
PCG40_29 | 3GPP contribution toward Revision 4 of Rec. ITU-R M.2012 | other | 3GPP TSG RAN ITU Coordinator |
PCG-40 AI: 9 |
available | [WTS] [JSN] | |||
PCG40_30 | 3GPP PCG/OP Meeting Accessibility | other | ATIS |
PCG-40 AI: 12 |
available | [WTS] [JSN] | |||
PCG40_31 | 5G-IA MRP Report | report | 5G-IA |
PCG-40 AI: 10 |
available | [WTS] [JSN] | |||
PCG40_32 | A study on 5G V2X Deployment | other | 5G-IA |
PCG-40 AI: 10 |
available | [WTS] [JSN] | |||
PCG40_33 | View on 5G Architecture | other | 5G-IA |
PCG-40 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_01 | Draft Agenda | agenda | Secretary |
PCG-41 AI: 2 |
available | [WTS] [JSN] | |||
PCG41_02 | Summary minutes, decisions and actions arising from PCG Meeting#40, held in Beijing, China, on 11 April 2018 | report | Secretary |
PCG-41 AI: 3 |
available | [WTS] [JSN] | |||
PCG41_03 | Status of Actions | other | Secretary |
PCG-41 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG41_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-41 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG41_05 | Report from TSG RAN | report | TSG RAN Chairman |
PCG-41 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG41_06 | Report from TSG SA | report | TSG SA Chairman |
PCG-41 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG41_07 | Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 4 of Rec. ITU-R M.2012, “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)” | response | TSG SA |
PCG-41 AI: 9 |
available | [WTS] [JSN] | |||
PCG41_08 | LTI on 3GPP 5G Preliminary Description Template and Self-Evaluation | response | TSG SA |
PCG-41 AI: 9 |
available | [WTS] [JSN] | |||
PCG41_09 | LTI ANSWER TO LIAISON STATEMENT TO EXTERNAL ORGANISATIONS ON THE REVISION OF RECOMMENDATION ITU-R M.2084-0 | response | TSG SA |
PCG-41 AI: 9 |
available | [WTS] [JSN] | |||
PCG41_10 | LETTER TO ITU IN REPLY TO ITU-R WP1A/TEMP/135 = RP-181516 ON PRELIMINARY DRAFT REVISION OF REPORT ITU-R SM.2351-2 ON SMART GRID UTILITY MANAGEMENT SYSTEMS | response | TSG SA |
PCG-41 AI: 9 |
available | [WTS] [JSN] | |||
PCG41_11 | TCCA MRP update | other | TCCA |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_12 | Chairman and Vice Chairmen of 3GPP PCG for 2019 | other | Secretary |
PCG-41 AI: 12 |
available | [WTS] [JSN] | |||
PCG41_13 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-41 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG41_14 | Content of open 3GPP Releases | Work Plan | 3GPP Work Plan Coordinator |
PCG-41 AI: 5 |
available | [WTS] [JSN] | |||
PCG41_15 | Work Programme changes since PCG#40 (April 2018) | Work Plan | 3GPP Work Plan Coordinator |
PCG-41 AI: 6 |
available | [WTS] [JSN] | |||
PCG41_16 | 4G Americas MRP Report | report | 4G Americas |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_17 | LTE to 5G: The Global Impact of Wireless Innovation | other | 4G Americas |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_18 | Small cell siting challenges and recommendations | other | 4G Americas |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_19 | 5GAA MRP Report |
report revised to PCG41_22 |
5GAA |
PCG-41 AI: 10 |
revised | [WTS] [JSN] | |||
PCG41_20 | Bringing together the 5G Verticals around 3GPP |
other revised to PCG41_23 |
5GAA |
PCG-41 AI: 10 |
revised | [WTS] [JSN] | |||
PCG41_21 | IT Improvements Report | other | IT Improvements Convenor |
PCG-41 AI: 8 |
available | [WTS] [JSN] | |||
PCG41_22 | 5GAA MRP Report |
report revision of PCG41_19 |
5GAA |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_23 | Bringing together the 5G Verticals around 3GPP |
other revision of PCG41_20 |
5GAA |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_24 | GCF MRP Report | report | GCF |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_25 | MCC Report | report | Secretary |
PCG-41 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG41_26 | NGMN MRP Report | report | NGMN |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_27 | PSCE activities, including BroadWay | report | PCSE |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_28 | GSMA MRP update for 3GPP | report | GSMA |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_29 | 5G-IA MRP Report | report | 5G-IA |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_30 | GSA MRP Report | report | GSA |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG41_31 | Enabling 3GPP to address “Country” enhancements | other | TSDSI |
PCG-41 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_01 | Draft Agenda | agenda | Secretary |
PCG-42 AI: 2 |
available | [WTS] [JSN] | |||
PCG42_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#41, held in Makuhari, Japan, on 18 October 2018 | report | Secretary |
PCG-42 AI: 3 |
available | [WTS] [JSN] | |||
PCG42_03 | Status of Actions | other | Secretary |
PCG-42 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG42_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-42 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG42_05 | Report from TSG RAN | report | TSG RAN Chairman |
PCG-42 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG42_06 | Report from TSG SA | report | TSG SA Chairman |
PCG-42 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG42_07 | Draft LTI in reply to LS on Strategies and policies for the deployment of broadband in developing countries |
response revised to PCG42_08 |
TSG SA |
PCG-42 AI: 9 |
revised | [WTS] [JSN] | |||
PCG42_08 | Draft LTI in reply to LS on Strategies and policies for the deployment of broadband in developing countries |
response revision of PCG42_07 |
TSG SA |
PCG-42 AI: 9 |
available | [WTS] [JSN] | |||
PCG42_09 | Correspondence received from Verizon | response | Secretary |
PCG-42 AI: 11 |
available | [WTS] [JSN] | |||
PCG42_10 | 5G Americas MRP Report | report | 5G Americas |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_11 | Whitepaper: The status of open-source for 5G | other | 5G Americas |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_12 | Whitepaper: 5G Spectrum Vision | other | 5G Americas |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_13 | Whitepaper: 5G Security | other | 5G Americas |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_14 | MCC Task Force 160 (TF160) Description and Terms of Reference for 2019 [RP-182197] | other | TSG RAN |
PCG-42 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG42_15 | IMT2020 submission in light of revised Rel-16 schedule | other | TSG RAN Chairman |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_16 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-42 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG42_17 | WP Report on Virtual Presence and Virtual Meetings | report | Working Procedures Convenor |
PCG-42 AI: 8 |
available | [WTS] [JSN] | |||
PCG42_18 | 3rd Generation Partnership Project; Project Coordination Group – Working Procedures
report
|
Working Procedures Group |
|
|
|
PCG-42 |
AI: 8 available |
[WTS]
[JSN]
|
|
PCG42_19 | WP Report on IPR Registry | report | Working Procedures Convenor |
PCG-42 AI: 8 |
available | [WTS] [JSN] | |||
PCG42_20 | MCC Activity Report | report | Secretary |
PCG-42 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG42_21 | PCG Appointment of TSG Chairmen and Vice Chairmen | other | Secretary |
PCG-42 AI: 4 |
available | [WTS] [JSN] | |||
PCG42_22 | 3GPP Specification Reference Process | discussion | TTA |
PCG-42 AI: 9 |
available | [WTS] [JSN] | |||
PCG42_23 | COAI MRP update |
report revised to PCG42_37 |
COAI |
PCG-42 AI: 10 |
revised | [WTS] [JSN] | |||
PCG42_24 | Stability of Rel-15 NR technical specifications | other | CCSA |
PCG-42 AI: 4 |
available | [WTS] [JSN] | |||
PCG42_25 | LS process with the ITU | other | TSG RAN Chairman |
PCG-42 AI: 9 |
available | [WTS] [JSN] | |||
PCG42_26 | Region-specific standardization in 3GPP | discussion | TSG SA Chairman |
PCG-42 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG42_27 | LS in reply to LS on Draft new Recommendation E.RQST - 'KPI targets for mobile networks' [SP-190269] | LS in | TSG SA |
PCG-42 AI: 9 |
available | [WTS] [JSN] | |||
PCG42_28 | Draft LTI ANSWER TO LIAISON STATEMENT TO EXTERNAL ORGANISATIONS ON THE REVISION OF RECOMMENDATION ITU-R M.2084-0 [SP-190273] | LS in | TSG SA |
PCG-42 AI: 9 |
available | [WTS] [JSN] | |||
PCG42_29 | 5G Verticals Workshop Executive Summary | report | Maxime Flament (5GAA) |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_30 | NGMN Alliance Update | report | NGMN |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_31 | GSMA MRP Update for 3GPP | report | GSMA |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_32 | Quality Assurance of 3GPP Specifications | other | GSMA |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_33 | Content of open 3GPP Releases | Work Plan | 3GPP Work Plan Coordinator |
PCG-42 AI: 5 |
available | [WTS] [JSN] | |||
PCG42_34 | Work Programme changes since PCG#41 (October 2018) | Work Plan | 3GPP Work Plan Coordinator |
PCG-42 AI: 6 |
available | [WTS] [JSN] | |||
PCG42_35 | 5GAA MRP update | report | 5GAA |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_36 | Marketing and Communications Report | report | 3GPP Marketing and Communications Officer |
PCG-42 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG42_37 | COAI MRP update |
report revision of PCG42_23 |
COAI |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_38 | Concerns About 3GPP Year 2020 Inputs to the ITU-R IMT-2020 Process Due To the 3GPP Release 16 Revised Schedule | other | Stephen Blust, AT&T, Chairman ITU-R Working Party 5D |
PCG-42 AI: 9 |
available | [WTS] [JSN] | |||
PCG42_39 | 5G IA/5G PPP activities |
report revised to PCG42_42 |
5G IA |
PCG-42 AI: 10 |
revised | [WTS] [JSN] | |||
PCG42_40 | Global 4G-5G Status – _x00B_and other interesting facts |
report revised to PCG42_41 |
GSA |
PCG-42 AI: 10 |
revised | [WTS] [JSN] | |||
PCG42_41 | Global 4G-5G Status – _x00B_and other interesting facts |
report revision of PCG42_40 |
GSA |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG42_42 | 5G IA/5G PPP activities |
report revision of PCG42_39 |
5G IA |
PCG-42 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_01 | Draft Agenda | agenda | Secretary |
PCG-43 AI: 2 |
available | [WTS] [JSN] | |||
PCG43_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#42, held in Versoix, Switzerland, on 28 March 2019 | report | Secretary |
PCG-43 AI: 3 |
available | [WTS] [JSN] | |||
PCG43_03 | Status of Actions |
other revised to PCG43_35 |
Secretary |
PCG-43 AI: 3.1 |
revised | [WTS] [JSN] | |||
PCG43_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-43 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG43_05 | Report from TSG RAN | report | TSG RAN Chairman |
PCG-43 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG43_06 | Report from TSG SA | report | TSG SA Chairman |
PCG-43 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG43_07 | LTI on 3GPP final technology submission of 3GPP 5G solutions for IMT-2020 [SP190576/RP191533] | response | TSG SA |
PCG-43 AI: 9 |
approved | [WTS] [JSN] | |||
PCG43_08 | LIAISON STATEMENT TO 3GPP PROPONENT CONCERNING THE TIME INTERVAL TO PROVIDE TRANSPOSING REFERENCES FOR IMT-2020 | other | ITU-R WP5D |
PCG-43 AI: 9 |
available | [WTS] [JSN] | |||
PCG43_09 | Solution for provision of 3GPP IMT-2020 Global Core Specifications (GCS) to the ITU-R process in June 2020 due to the 3GPP Release 16 revised schedule and meeting overlap | other | ATIS |
PCG-43 AI: 9 |
available | [WTS] [JSN] | |||
PCG43_10 | 3GPP Super-Features | other | MCC |
PCG-43 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG43_11 | MCC proposals on IMT-2020 submission |
other revised to PCG43_16 |
MCC |
PCG-43 AI: 9 |
revised | [WTS] [JSN] | |||
PCG43_12 | Advance Notification of IMT-2020 Process ‘Form A’ to the ITU-R | other | ATIS |
PCG-43 AI: 9 |
available | [WTS] [JSN] | |||
PCG43_13 | Chairman and Vice Chairmen of 3GPP PCG for 2020 | other | Secretary |
PCG-43 AI: 12 |
available | [WTS] [JSN] | |||
PCG43_14 | Proposed Working Procedures ChangeRemoving Quorum for Working Agreements | other | Stephen Hayes WP Convenor |
PCG-43 AI: 8 |
available | [WTS] [JSN] | |||
PCG43_15 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-43 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG43_16 | MCC proposals on IMT-2020 submission |
other revision of PCG43_11 |
MCC |
PCG-43 AI: 9 |
available | [WTS] [JSN] | |||
PCG43_17 | Reply LS to “O-RAN Alliance & 3GPP Coordination on O-RAN Alliance Outputs” | other | TSG SA |
PCG-43 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG43_18 | Specification Quality Assurance Automation | other | Sprint Corporation |
PCG-43 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG43_19 | Content of open 3GPP ReleasesContent of open 3GPP Releases | Work Plan | 3GPP Work Plan Coordinator |
PCG-43 AI: 5 |
available | [WTS] [JSN] | |||
PCG43_20 | Work Programme changes since PCG#42 (March 2019) | Work Plan | 3GPP Work Plan Coordinator |
PCG-43 AI: 6 |
available | [WTS] [JSN] | |||
PCG43_21 | Broadband India Forum MRP Report | report | Broadband India Forum |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_22 | 3GPP Release 15 & 16 Versions to be utilised for IMT-2020 Global Core Specifications (GCS) and Transpositions and General Observations on Work for IMT-2020 (Reference TSG #85) | other | ATIS |
PCG-43 AI: 9 |
available | [WTS] [JSN] | |||
PCG43_23 | MCC Activity Report | report | MCC |
PCG-43 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG43_24 | 3GPP IT Task Force Report | report | IT Improvements Ad Hoc Group Convenor |
PCG-43 AI: 8 |
available | [WTS] [JSN] | |||
PCG43_25 | COAI MRP Update | report | COAI |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_26 | 2nd 5G Vertical User Workshop Executive Summary | report | 5GAA |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_27 | NGMN Alliance Update | report | NGMN |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_28 | Update of Satellite Sector Activities | report | ESOA |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_29 | Pioneering digital transformation in the automotive industry | report | 5GAA |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_30 | CTIA MRP Report | report | CTIA |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_31 | 5G Americas MRP Report | report | 5G Americas |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_32 | White Paper: Advanced Antenna Systems for 5G | report | 5G Americas |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_33 | White Paper: The Evolution of Security in 5G | report | 5G Americas |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_34 | White Paper: Global 5G: Implications of a Transformational Technology | report | 5G Americas |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_35 | Status of Actions |
other revision of PCG43_03 |
Secretary |
PCG-43 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG43_36 | PSCE Update: BROADWAY Tender Process complete | report | PSCE |
PCG-43 AI: 10 |
available | [WTS] [JSN] | |||
PCG43_37 | TSDSI Update for 3GPP PCG | other | TSDSI |
PCG-43 AI: 13 |
available | [WTS] [JSN] | |||
PCG43_38 | QA Tool Demonstration Video | other | GSMA |
PCG-43 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG44_01 | Draft Agenda | agenda | Secretary |
PCG-ah-37175 AI: 2 |
available | [WTS] [JSN] | |||
PCG44_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#43, held in Washington D.C., US, on 2 October 2019 | report | Secretary |
PCG-ah-37175 AI: 3 |
available | [WTS] [JSN] | |||
PCG44_03 | Actions Status List | other | Secretary |
PCG-ah-37175 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG44_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-ah-37175 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG44_05 | Report from TSG RAN | report | TSG RAN Chairman |
PCG-ah-37175 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG44_06 | Report from TSG SA | report | TSG SA Chairman |
PCG-ah-37175 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG44_07 | Reply LS on Non-critical extension | other | TSG RAN |
PCG-ah-37175 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG44_08 | TALKING POINTS FOR COMMENTS TO THE 5.9 GHZ MODERNIZATION NPRM | other | 5G AA |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG44_09 | Reminder on Way Forward on 3GPP Release 15 & 16 Versions to be utilized for IMT-2020 Global Core Specifications (GCS) and Transpositions for IMT-2020 - need to update the detailed work plan for 3GPP GCS development. | other | ATIS |
PCG-ah-37175 AI: 9 |
available | [WTS] [JSN] | |||
PCG44_10 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-ah-37175 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG44_11 | Draft Letter to ITU in reply to ITU_R_WP5D_TEMP_39 = RP-200037 on the schedule for updating Recommendation ITU-R M.2012 to Revision 5 [SP-200282] | response | TSG SA |
PCG-ah-37175 AI: 9 |
available | [WTS] [JSN] | |||
PCG44_12 | Draft Letter to ITU in reply to ITU_R_WP5D_TEMP_58rev1 = RP-200043 on Development of a draft new report ITU-R M.[IMT.C-V2X] – Application of the Terrestrial Component of IMT for Cellular-V2X [SP-200283] | response | TSG SA |
PCG-ah-37175 AI: 9 |
available | [WTS] [JSN] | |||
PCG44_13 | Draft Letter to ITU on 3GPP “5G” material for Recommendation ITU-R M.[IMT-2020 specs] - SRIT [SP=200284 |
response revised to PCG44_32 |
TSG SA |
PCG-ah-37175 AI: 9 |
revised | [WTS] [JSN] | |||
PCG44_14 | Draft Letter to ITU on 3GPP “5G” material for Recommendation ITU-R M.[IMT-2020 specs] - RIT [SP-200285] |
response revised to PCG44_33 |
TSG SA |
PCG-ah-37175 AI: 9 |
revised | [WTS] [JSN] | |||
PCG44_15 | GCS version tables | other | MCC (Specifications Manager) |
PCG-ah-37175 AI: 9 |
available | [WTS] [JSN] | |||
PCG44_16 | MCC Activity Report | report | Secretary |
PCG-ah-37175 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG44_17 | Consensus building of IMT-2020 development process | other | TTA |
PCG-ah-37175 AI: 9 |
available | [WTS] [JSN] | |||
PCG44_18 | Recommendations on electronic meetings | other | ATIS |
PCG-ah-37175 AI: 8 |
available | [WTS] [JSN] | |||
PCG44_19 | GoToWebinar in 3GPP meetings | other | TSG RAN Chairman, TSG SA Chairman, TSG CT Chairman, CT1 Chairman, CT3 Chairman, CT4 Chairman, CT6 Chairman, SA1 Chairman, SA3 Chairman, SA4 Chairman, SA5 Chairman, SA6 Chairman RAN1 Chairman, RAN2 Chairman, RAN3 Chairman, RAN4 Chairman, RAN5 Chairman |
PCG-ah-37175 AI: 8 |
available | [WTS] [JSN] | |||
PCG44_20 | The NGMN Alliance - Update | report | NGMN Alliance |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG44_21 | 5G Americas MRP Report | report | 5G Americas |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG44_22 | Analisis-de-las-Recomendaciones-de-Espectro-de-la-UIT-en-America-Latina | report | 5G Americas |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG44_23 | 5G-and-the-Cloud | report | 5G Americas |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG44_24 | 5G-Evolution-3GPP-R16-R17 | report | 5G Americas |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG44_25 | 5G Security-White-Paper | report | 5G Americas |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG44_26 | Global-Implications-of-a-Transformational-Technology-White-Paper | report | 5G Americas |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG44_27 | EDGE-White-Paper | report | 5G Americas |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG44_28 | Content of open 3GPP Releases | Work Plan | 3GPP Work Plan Coordinator |
PCG-ah-37175 AI: 5 |
available | [WTS] [JSN] | |||
PCG44_29 | Work Programme changes since PCG#43 (September 2019) | Work Plan | 3GPP Work Plan Coordinator |
PCG-ah-37175 AI: 6 |
available | [WTS] [JSN] | |||
PCG44_30 | 3GPP e-meetings | other | TSG SA Chairman |
PCG-ah-37175 AI: 8 |
available | [WTS] [JSN] | |||
PCG44_31 | 3GPP IT Task Force Report | report | 3GPP IT Task Force Convenor |
PCG-ah-37175 AI: 8 |
available | [WTS] [JSN] | |||
PCG44_32 | Draft Letter to ITU on 3GPP “5G” material for Recommendation ITU-R M.[IMT-2020 specs] - SRIT [SP=200284 |
response revision of PCG44_13 |
TSG SA |
PCG-ah-37175 AI: 9 |
available | [WTS] [JSN] | |||
PCG44_33 | Draft Letter to ITU on 3GPP “5G” material for Recommendation ITU-R M.[IMT-2020 specs] - RIT [SP-200285] |
response revision of PCG44_14 |
TSG SA |
PCG-ah-37175 AI: 9 |
available | [WTS] [JSN] | |||
PCG44_34 | India - A Status Update | other | Broadband India Forum |
PCG-ah-37175 AI: 10 |
available | [WTS] [JSN] | |||
PCG45_01 | Draft Agenda | agenda | Secretary |
PCG-45-e AI: 2 |
available | [WTS] [JSN] | |||
PCG45_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#44-e, held on 7 April 2020 | report | Secretary |
PCG-45-e AI: 3 |
available | [WTS] [JSN] | |||
PCG45_03 | Actions Status List | other | Secretary |
PCG-45-e AI: 3.1 |
available | [WTS] [JSN] | |||
PCG45_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-45-e AI: 4.1 |
available | [WTS] [JSN] | |||
PCG45_05 | Report from TSG RAN | other | TSG RAN Chairman |
PCG-45-e AI: 4.2 |
available | [WTS] [JSN] | |||
PCG45_06 | Report from TSG SA |
report revised to PCG45_34 |
TSG SA Chairman |
PCG-45-e AI: 4.3 |
revised | [WTS] [JSN] | |||
PCG45_07 | RECOMMENDATION ITU-R M.[IMT-2020.SPECS]: Specification of the 3GPP 5G radio interface technology - SRIT | other | ATIS |
PCG-45-e AI: 9 |
available | [WTS] [JSN] | |||
PCG45_08 | RECOMMENDATION ITU-R M.[IMT-2020.SPECS]: Specification of the 3GPP 5G radio interface technology - RIT | other | ATIS |
PCG-45-e AI: 9 |
available | [WTS] [JSN] | |||
PCG45_09 | DRAFT LTI - answer to ITU-R WP5D LS on WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT REVISION OF REPORT ITU-R M.2291-1 [RP-200572/SP-200308] | response | TSG SA |
PCG-45-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG45_10 | Working Procedures Group: Report and Recommendations | report | WP Group Convenor |
PCG-45-e AI: 8 |
available | [WTS] [JSN] | |||
PCG45_11 | Proposed Changes to 3GPP Working Procedures Annex I | other | WP Group Cpnvenor |
PCG-45-e AI: 8 |
available | [WTS] [JSN] | |||
PCG45_12 | Chairman and Vice Chairmen of 3GPP PCG for 2021 | other | Secretary |
PCG-45-e AI: 12 |
available | [WTS] [JSN] | |||
PCG45_13 | Marketing and Communications Report |
report revised to PCG45_29 |
Marketing and Communications Officer |
PCG-45-e AI: 7.2 |
revised | [WTS] [JSN] | |||
PCG45_14 | 3GPP IT Task Force Group Report and Recommendations | report | IT Task Force Convenor |
PCG-45-e AI: 8 |
available | [WTS] [JSN] | |||
PCG45_15 | The NGMN Alliance - Update | report | NGMN |
PCG-45-e AI: 10 |
available | [WTS] [JSN] | |||
PCG45_16 | 5G White Paper 2 | report | NGMN |
PCG-45-e AI: 10 |
available | [WTS] [JSN] | |||
PCG45_17 | DRAFT LTI - answer to ITU-R WP5D LS on DEVEOPMENT OF DRAFT NEW RPORT ITU-R.M[IMT.C-V2X] – APPLICATION OF THE TERRESTRIAL COMPONENT OF IMT FOR CELLULAR-V2X [SP-200873] | other | TSG SA |
PCG-45-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG45_18 | Draft Letter to ITU in reply to ITU_R_WP5D_TEMP_39 = RP-200037 on update submission for LTE-Advanced towards Revision 5 of Recommendation ITU-R M.2012 [SP-200874] | other | TSG SA |
PCG-45-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG45_19 | DRAFT LTI - answer to ITU-R WP5A LS on CONNECTED AUTOMATED VEHICLES (CAV) [SP-200875] | other | TSG SA |
PCG-45-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG45_20 | Draft Letter to ITU in answer to LS to RIT/SRIT Proponents on the completion and conclusions of steps 5 to 7 of the IMT-2020 process for the first release of new Recommendation ITU-R M.[IMT-2020.SPECS] [SP-200876] | other | TSG SA |
PCG-45-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG45_21 | Draft Letter to ITU - Response LS on 3GPP’s activities related to WRC-19 Resolutions [RP-202054] | other | TSG RAN |
PCG-45-e AI: 9 |
available | [WTS] [JSN] | |||
PCG45_22 | 5G Americas MRP Report | report | 5G Americas |
PCG-45-e AI: 10 |
available | [WTS] [JSN] | |||
PCG45_23 | Global 5G: Rise of a transformational technology | report | 5G Americas |
PCG-45-e AI: 10 |
available | [WTS] [JSN] | |||
PCG45_24 | Security considerations for the 5G era |
report revised to PCG45_30 |
5G Americas |
PCG-45-e AI: 10 |
revised | [WTS] [JSN] | |||
PCG45_25 | Innovations in 5G backhaul technologies | report | 5G Americas |
PCG-45-e AI: 10 |
available | [WTS] [JSN] | |||
PCG45_26 | MRPs Update: Test & certification initiatives for Mission Critical 4G/5G | report | TCCA and GCF |
PCG-45-e AI: 10 |
available | [WTS] [JSN] | |||
PCG45_27 | MCC Report | report | Secretary |
PCG-45-e AI: 7.1 |
available | [WTS] [JSN] | |||
PCG45_28 | 5G Automotive Association Status update | report | 5GAA |
PCG-45-e AI: 10 |
available | [WTS] [JSN] | |||
PCG45_29 | Marketing and Communications Report |
report revision of PCG45_13 |
Marketing and Communications Officer |
PCG-45-e AI: 7.2 |
available | [WTS] [JSN] | |||
PCG45_30 | Security considerations for the 5G era |
report revision of PCG45_24 |
5G Americas |
PCG-45-e AI: 10 |
available | [WTS] [JSN] | |||
PCG45_31 | Content of open 3GPP Releases | Work Plan | 3GPP Work Plan Coordinator |
PCG-45-e AI: 5 |
available | [WTS] [JSN] | |||
PCG45_32 | Work Programme changes since PCG#44 (April 2020) | Work Plan | 3GPP Work Plan Coordinator |
PCG-45-e AI: 6 |
available | [WTS] [JSN] | |||
PCG45_33 | OP responses to high transposition questionnaire | other | Secretary |
PCG-45-e AI: 3.1 |
available | [WTS] [JSN] | |||
PCG45_34 | Report from TSG SA |
report revision of PCG45_06 |
TSG SA Chairman |
PCG-45-e AI: 4.3 |
available | [WTS] [JSN] | |||
PCG46_01 | Draft Agenda | agenda | Secretary |
PCG-46-e AI: 2 |
available | [WTS] [JSN] | |||
PCG46_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#45-e, held on 28-29 September 2020 | report | Secretary |
PCG-46-e AI: 3 |
available | [WTS] [JSN] | |||
PCG46_03 | Actions Status List | other | Secretary |
PCG-46-e AI: 3.1 |
available | [WTS] [JSN] | |||
PCG46_04 | Report from TSG CT | report | TSG CT Chairman |
PCG-46-e AI: 4.1 |
available | [WTS] [JSN] | |||
PCG46_05 | Report from TSG RAN | report | TSG RAN Chairman |
PCG-46-e AI: 4.2 |
available | [WTS] [JSN] | |||
PCG46_06 | Report from TSG SA | report | TSG SA Chairman |
PCG-46-e AI: 4.3 |
available | [WTS] [JSN] | |||
PCG46_07 | DRAFT Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 5 of Rec. ITU-R M.2012, “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced) [SP-200917] | other | TSG SA |
PCG-46-e AI: 10 |
available | [WTS] [JSN] | |||
PCG46_08 | Rules for Remote Participation in Face-to-Face 3GPP PCG/OP Meetings | other | ATIS |
PCG-46-e AI: 9 |
available | [WTS] [JSN] | |||
PCG46_09 | Exception request based on online election trials | other | Working Procedures Group Convenor |
PCG-46-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG46_10 | PCG Appointment of TSG Chairmen and Vice Chairmen | other | Secretary |
PCG-46-e AI: 5 |
available | [WTS] [JSN] | |||
PCG46_11 | Draft Letter to ITU in reply to RP-210731 = ITU_R_WP5D_TEMP_313 on timing of updates to IMT-2020 Recommendation ITU-R M.2150 and IMT-Advanced Recommendation ITU-R M.2012 after year 2021 [SP-210028 & RP-210783] | response | TSG SA |
PCG-46-e AI: 10 |
available | [WTS] [JSN] | |||
PCG46_12 | DRAFT Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 5 of Rec. ITU-R M.2012, “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications Advanced (IMT-Advanced)” [SP-210029 & RP-210787] | response | TSG SA |
PCG-46-e AI: 10 |
available | [WTS] [JSN] | |||
PCG46_13 | Exception request for online RAN4 Chairman election | other | TSG RAN Chairman |
PCG-46-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG46_14 | 5G Americas MRP Report | report | 5G Americas |
PCG-46-e AI: 11 |
available | [WTS] [JSN] | |||
PCG46_15 | 3GPP Releases 16&17&Beyond - White Paper | other | 5G Americas |
PCG-46-e AI: 11 |
available | [WTS] [JSN] | |||
PCG46_16 | Mobile Communications beyond 2020 - The evolution of 5G towards the next G - White Paper | other | 5G Americas |
PCG-46-e AI: 11 |
available | [WTS] [JSN] | |||
PCG46_17 | Global 5G: Rise of a Transformational Technology | other | 5G Americas |
PCG-46-e AI: 11 |
available | [WTS] [JSN] | |||
PCG46_18 | ITU-R Transpositions Timeline | other | ATIS |
PCG-46-e AI: 10 |
available | [WTS] [JSN] | |||
PCG46_19 | COAI MRP Report to PCG |
report revised to PCG46_31 |
COAI |
PCG-46-e AI: 11 |
revised | [WTS] [JSN] | |||
PCG46_20 | Working Procedures Group_x00B_Report and Recommendations | report | WP Group Convenor |
PCG-46-e AI: 9 |
available | [WTS] [JSN] | |||
PCG46_21 | Criteria for 3GPP Face-to-Face Meetings Whilst Annex I is Activated | other | TSG SA Chair, TSG CT Chair |
PCG-46-e AI: 9 |
available | [WTS] [JSN] | |||
PCG46_22 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-46-e AI: 8.2 |
available | [WTS] [JSN] | |||
PCG46_23 | Contribution to Address 3GPP Meetings Going Forward | other | ATIS |
PCG-46-e AI: 9 |
available | [WTS] [JSN] | |||
PCG46_24 | Transposition Tooling and Process | other | ATIS |
PCG-46-e AI: 3.1 |
available | [WTS] [JSN] | |||
PCG46_25 | Content of open 3GPP Releases | Work Plan | 3GPP Work Plan Coordinator |
PCG-46-e AI: 6 |
available | [WTS] [JSN] | |||
PCG46_26 | Work Programme changes since PCG#45 (25 September 2020) |
other revised to PCG46_27 |
3GPP Work Plan Coordinator |
PCG-46-e AI: 7 |
withdrawn | [WTS] [JSN] | |||
PCG46_27 | Work Programme changes since PCG#45 (25 September 2020) |
other revision of PCG46_26 |
3GPP Work Plan Coordinator |
PCG-46-e AI: 7 |
available | [WTS] [JSN] | |||
PCG46_28 | MCC Report | report | Secretary |
PCG-46-e AI: 8.1 |
available | [WTS] [JSN] | |||
PCG46_29 | NGMN MRP Report | report | NGMN |
PCG-46-e AI: 11 |
available | [WTS] [JSN] | |||
PCG46_30 | 6G Drivers and Vision | report | NGMN |
PCG-46-e AI: 11 |
available | [WTS] [JSN] | |||
PCG46_31 | COAI MRP Report to PCG |
report revision of PCG46_19 |
COAI |
PCG-46-e AI: 11 |
available | [WTS] [JSN] | |||
PCG46_32 | ESOA MRP Report | report | ESOA |
PCG-46-e AI: 11 |
available | [WTS] [JSN] | |||
PCG46_33 | 5GAA MRP Report | report | 5GAA |
PCG-46-e AI: 11 |
available | [WTS] [JSN] | |||
PCG47_01 | Draft Agenda | agenda | Secretary |
PCG-47-e AI: 2 |
available | [WTS] [JSN] | |||
PCG47_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#46-e, held on 27-28 April 2021 | report | Secretary |
PCG-47-e AI: 3 |
available | [WTS] [JSN] | |||
PCG47_03 | Actions Status List | other | Secretary |
PCG-47-e AI: 3.1 |
available | [WTS] [JSN] | |||
PCG47_04 | Report from TSG CT | report | TSG CT Chair |
PCG-47-e AI: 4.1 |
available | [WTS] [JSN] | |||
PCG47_05 | Report from TSG RAN | report | TSG RAN Chair |
PCG-47-e AI: 4.2 |
available | [WTS] [JSN] | |||
PCG47_06 | Report from TSG SA |
report revised to PCG47_36 |
TSG SA Chair |
PCG-47-e AI: 4.3 |
revised | [WTS] [JSN] | |||
PCG47_07 | Draft Letter to ITU - Response LS on 3GPP’s activities related to WRC-19 Resolutions | response | TSG RAN |
PCG-47-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG47_08 | LS on how to handle satellite specific specifications in future submissions to ITU related to terrestrial-only technologies [RP-212537] | other | TSG RAN |
PCG-47-e AI: 9 |
available | [WTS] [JSN] | |||
PCG47_09 | DRAFT LTI on 3GPP activities on “Satellite IOT” [SP-211110] | other | TSG SA |
PCG-47-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG47_10 | Draft LTI ANSWER TO LIAISON STATEMENT TO EXTERNAL ORGANISATIONS ON THE REVISION OF RECOMMENDATION ITU-R M.1801-2 [SP-211107] | other | TSG SA |
PCG-47-e AI: 9 |
available | [WTS] [JSN] | |||
PCG47_11 | DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2012 to Revision 6 [SP-211108] | other | TSG SA |
PCG-47-e AI: 9 |
available | [WTS] [JSN] | |||
PCG47_12 | DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2150 to Revision ‘After Year 2021’ [SP-211109] | other | TSG SA |
PCG-47-e AI: 9 |
available | [WTS] [JSN] | |||
PCG47_13 | Liaison from ISG IPE on IPv6 Enhanced Innovation Gap Analysis | other | ETSI ISG IPE |
PCG-47-e AI: 11 |
available | [WTS] [JSN] | |||
PCG47_14 | Chair and Vice Chairs of 3GPP PCG for 2022 | other | Secretary |
PCG-47-e AI: 12 |
available | [WTS] [JSN] | |||
PCG47_15 | Content of open 3GPP Releases | Work Plan | 3GPP Work Plan Coordinator |
PCG-47-e AI: 5 |
available | [WTS] [JSN] | |||
PCG47_16 | Work Programme changes since PCG#46 (April 2021) | Work Plan | 3GPP Work Plan Coordinator |
PCG-47-e AI: 6 |
available | [WTS] [JSN] | |||
PCG47_17 | MCC Report | report | Secretary |
PCG-47-e AI: 7.1 |
available | [WTS] [JSN] | |||
PCG47_18 | Contribution on 3GPP Meeting Contingency Plan | other | ATIS |
PCG-47-e AI: 8 |
available | [WTS] [JSN] | |||
PCG47_19 | 5G Americas MRP Report | report | 5G Americas |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_20 | Private and Enterprise Networks: White Paper | report | 5G Americas |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_21 | Vehicular Connectivity C-V2X and 5G: White Paper | report | 5G Americas |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_22 | 5G Vertical Use Cases: White Paper | report | 5G Americas |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_23 | Report of PCG Group to Study Transposition Improvements | report | Leader of PCG Group to Study Transposition Improvements |
PCG-47-e AI: 8 |
available | [WTS] [JSN] | |||
PCG47_24 | Marketing and Communications Report | report | 3GPP Marketing and Communications Officer |
PCG-47-e AI: 7.2 |
available | [WTS] [JSN] | |||
PCG47_25 | 3GPP Website redesign | other | 3GPP Marketing and Communications Officer |
PCG-47-e AI: 7.2 |
available | [WTS] [JSN] | |||
PCG47_26 | Proposal to Investigate Interim Settings for Face-to-Face Meetings | other | TSG SA Chair, TSG RAN Chair, TSG CT Chair |
PCG-47-e AI: 8 |
available | [WTS] [JSN] | |||
PCG47_27 | 3GPP E-Meetings Calendar Planning | other | TSG SA Chair, TSG RAN Chair, TSG CT Chair |
PCG-47-e AI: 8 |
available | [WTS] [JSN] | |||
PCG47_28 | Contribution on 3GPP Voting Rights |
other revised to PCG47_41 |
ATIS |
PCG-47-e AI: 8 |
revised | [WTS] [JSN] | |||
PCG47_29 | Contribution on Alternative 3GPP Meeting Format | other | ETSI |
PCG-47-e AI: 8 |
available | [WTS] [JSN] | |||
PCG47_30 | COAI MRP Report to PCG | report | COAI |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_31 | CSAE MRP Report to PCG |
report revised to PCG47_39 |
CSAE |
PCG-47-e AI: 10 |
revised | [WTS] [JSN] | |||
PCG47_32 | NGMN MRP Report to PCG | report | NGMN |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_33 | NGMN White Paper: Green Future Networks Eco Design | report | NGMN |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_34 | NGMN White Paper: Green Future Networks Sustainability Challenges | report | NGMN |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_35 | NGMN White Paper: ODiN Operating Disaggregated Networks | report | NGMN |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_36 | Report from TSG SA |
report revision of PCG47_06 |
TSG SA Chair |
PCG-47-e AI: 4.3 |
available | [WTS] [JSN] | |||
PCG47_37 | LS to 3GPP OPs on Multi-SDO Autonomous Networks (AN) formal cooperation proposal | other | TSG SA (on behalf of WG SA5) |
PCG-47-e AI: 4.3 |
available | [WTS] [JSN] | |||
PCG47_38 | 5G for Media Distribution, Production and Contribution | report | 5G MAG |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_39 | CSAE MRP Report to PCG |
report revision of PCG47_31 |
CSAE |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_40 | 5GAA status report to 3GPP PCG | report | 5GAA |
PCG-47-e AI: 10 |
available | [WTS] [JSN] | |||
PCG47_41 | Contribution on 3GPP Voting Rights |
other revision of PCG47_28 revised to PCG47_43 |
ATIS |
PCG-47-e AI: 8 |
revised | [WTS] [JSN] | |||
PCG47_42 | CCSA comments to contribution on 3GPP voting rights (PCG47_41) | other | CCSA |
PCG-47-e AI: 8 |
available | [WTS] [JSN] | |||
PCG47_43 | Contribution on 3GPP Voting Rights |
other revision of PCG47_41 |
ATIS |
PCG-47-e AI: 8 |
available | [WTS] [JSN] | |||
PCG48_01 | Draft Agenda | agenda | Secretary |
PCG-48-e AI: 2 |
available | [WTS] [JSN] | |||
PCG48_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#47-e, held on 19-20 October 2021 | report | Secretary |
PCG-48-e AI: 3 |
available | [WTS] [JSN] | |||
PCG48_03 | Actions Status List | other | Secretary |
PCG-48-e AI: 3.1 |
available | [WTS] [JSN] | |||
PCG48_04 | Report from TSG CT | report | TSG CT Chair |
PCG-48-e AI: 4.1 |
available | [WTS] [JSN] | |||
PCG48_05 | Report from TSG RAN | report | TSG RAN Chair |
PCG-48-e AI: 4.2 |
available | [WTS] [JSN] | |||
PCG48_06 | Report from TSG SA | report | TSG SA Chair |
PCG-48-e AI: 4.3 |
available | [WTS] [JSN] | |||
PCG48_07 | Draft reply LS to ITU-R WP5D/TEMP/482rev1 = RP-212699 on work towards two new recommendations "Generic unwanted emission characteristics of base / mobile stations using the terrestrial radio interfaces of IMT-2020" [SP-211590/RP-213642] | other | TSG SA |
PCG-48-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG48_08 | Draft reply LS to ITU-R WP5D/TEMP/327(Rev.1) = RP-210747 on Revision of Recommendations ITU-R M.2070 and ITU-R M.2071 on Unwanted Emissions of IMT-Advanced " [SP-211591/RP-213643 | other | TSG SA |
PCG-48-e AI: 9 |
approved | [WTS] [JSN] | |||
PCG48_09 | Liaison Statement to 3GPP PCG on the merger of TSDSI 5Gi into 3GPP Rel-17 | other | TSDSI |
PCG-48-e AI: 11 |
available | [WTS] [JSN] | |||
PCG48_10 | Working Procedures Group: Interim Report | report | Working Procedures Group Convenor |
PCG-48-e AI: 8 |
approved | [WTS] [JSN] | |||
PCG48_11 | Working Procedures: Recommendation 1: Intent of voting rights P-CR | other | Working Procedures Group Convenor |
PCG-48-e AI: 8 |
available | [WTS] [JSN] | |||
PCG48_12 | Working Procedures: Recommendation 1: Voting rights P-CR | other | Working Procedures Group Convenor |
PCG-48-e AI: 8 |
approved | [WTS] [JSN] | |||
PCG48_13 | Working Procedures: Recommendation 3: Hardship P-CR | other | Working Procedures Group Convenor |
PCG-48-e AI: 8 |
approved | [WTS] [JSN] | |||
PCG48_14 | LS (RP-220028) on the merger of TSDSI 5Gi into 3GPP Rel-17 from TSDSI | response | TSG RAN |
PCG-48-e AI: 11 |
available | [WTS] [JSN] | |||
PCG48_15 | DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2150 to Revision ‘After Year 2021’ [SP-220265/RP-220048] | response | TSG SA |
PCG-48-e AI: 9 |
available | [WTS] [JSN] | |||
PCG48_16 | DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2012 to Revision 6 [SP-220266/RP-220049] | response | TSG SA |
PCG-48-e AI: 9 |
available | [WTS] [JSN] | |||
PCG48_17 | LS on Text Proposal toward ITU-R draft Report ITU-R M.[IMT.INDUSTRY] [SP-220337] | response | TSG SA |
PCG-48-e AI: 9 |
available | [WTS] [JSN] | |||
PCG48_18 | Draft reply LS to ITU-R WP5D/TEMP/482rev1 = RP-212699 on work towards two new recommendations "Generic unwanted emission characteristics of base / mobile stations using the terrestrial radio interfaces of IMT-2020" [SP-220344/RP-220911] | response | TSG SA |
PCG-48-e AI: 9 |
available | [WTS] [JSN] | |||
PCG48_19 | MCC Report | report | Secretary |
PCG-48-e AI: 7.1 |
available | [WTS] [JSN] | |||
PCG48_20 | Content of open 3GPP Releases | Work Plan | PP Work Plan Coordinator |
PCG-48-e AI: 5 |
available | [WTS] [JSN] | |||
PCG48_21 | Work Programme changes since PCG#47 (October 2021) | Work Plan | 3GPP Work Plan Coordinator |
PCG-48-e AI: 6 |
available | [WTS] [JSN] | |||
PCG48_22 | Working Procedures Group Report to PCG#48 |
report revised to PCG48_31 |
Working Procedures Group Convenor |
PCG-48-e AI: 8 |
revised | [WTS] [JSN] | |||
PCG48_23 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-48-e AI: 7.2 |
available | [WTS] [JSN] | |||
PCG48_24 | Open Generation 5G Consortium MRP Report | report | Open Generation 5G Consortium |
PCG-48-e AI: 10 |
available | [WTS] [JSN] | |||
PCG48_25 | 10 GHz Spectrum for non-terrestrial networks | other | Global Satellite Operators Association, GSOA |
PCG-48-e AI: 10 |
available | [WTS] [JSN] | |||
PCG48_26 | 5G Americas MRP Report | report | 5G Americas |
PCG-48-e AI: 10 |
available | [WTS] [JSN] | |||
PCG48_27 | 5G Americas White Paper: Security for 5G | report | 5G Americas |
PCG-48-e AI: 10 |
available | [WTS] [JSN] | |||
PCG48_28 | 5G Americas White Paper: EDGE Automation and Intelligence | report | 5G Americas |
PCG-48-e AI: 10 |
available | [WTS] [JSN] | |||
PCG48_29 | 5G Americas White Paper: Cellular Communications in a 5G Era | report | 5G Americas |
PCG-48-e AI: 10 |
available | [WTS] [JSN] | |||
PCG48_30 | Discussion paper on Continuation of Mixed-Mode Meeting Setting After De-Activation of Annex I | other | SA Chair |
PCG-48-e AI: 8 |
available | [WTS] [JSN] | |||
PCG48_31 | Working Procedures Group Report to PCG#48 |
report revision of PCG48_22 |
Working Procedures Group Convenor |
PCG-48-e AI: 8 |
available | [WTS] [JSN] | |||
PCG48_32 | Public Availability of NWM Discussions |
other revised to PCG48_36 |
ATIS |
PCG-48-e AI: 8 |
revised | [WTS] [JSN] | |||
PCG48_33 | Market Update on India |
report revised to PCG48_37 |
Broadband India Forum |
PCG-48-e AI: 10 |
revised | [WTS] [JSN] | |||
PCG48_34 | Introduction of China C-V2X Industry | report | CSAE |
PCG-48-e AI: 10 |
available | [WTS] [JSN] | |||
PCG48_35 | 5GAA MRP Report | report | 5GAA |
PCG-48-e AI: 10 |
available | [WTS] [JSN] | |||
PCG48_36 | Public Availability of NWM Discussions |
other revision of PCG48_32 |
ATIS |
PCG-48-e AI: 8 |
available | [WTS] [JSN] | |||
PCG48_37 | Market Update on India |
report revision of PCG48_33 |
Broadband India Forum |
PCG-48-e AI: 10 |
available | [WTS] [JSN] | |||
PCG49_01 | Draft Agenda | agenda | Chair |
PCG-49-e AI: 2 |
available | [WTS] [JSN] | |||
PCG49_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#48-e, held on 26-27 April 2022 | report | Secretary |
PCG-49-e AI: 3 |
available | [WTS] [JSN] | |||
PCG49_03 | Status of Actions | other | Secretary |
PCG-49-e AI: 3.1 |
available | [WTS] [JSN] | |||
PCG49_04 | Report from TSG CT |
report revised to PCG49_23 |
CT Chair |
PCG-49-e AI: 4.1 |
revised | [WTS] [JSN] | |||
PCG49_05 | Report from TSG RAN | report | RAN Chair |
PCG-49-e AI: 4.2 |
available | [WTS] [JSN] | |||
PCG49_06 | Report from TSG SA | report | SA Chair |
PCG-49-e AI: 4.3 |
available | [WTS] [JSN] | |||
PCG49_07 | Working Procedures Group Interim Report | report | Working Procedures Group Convenor |
PCG-49-e AI: 8 |
approved | [WTS] [JSN] | |||
PCG49_08 | Working Procedures P-CR for Registration | other | Working Procedures Group Convenor |
PCG-49-e AI: 8 |
approved | [WTS] [JSN] | |||
PCG49_09 | Simplification of process for implementation of COVID-19 policies | other | ATIS |
PCG-49-e AI: 8 |
available | [WTS] [JSN] | |||
PCG49_10 | 2024 Face-to-face meeting planning | other | ATIS |
PCG-49-e AI: 8 |
available | [WTS] [JSN] | |||
PCG49_11 | Chair and Vice Chairs of 3GPP PCG for 2023 | other | Secretary |
PCG-49-e AI: 12 |
available | [WTS] [JSN] | |||
PCG49_12 | MCC Report | report | Secretary |
PCG-49-e AI: 7.1 |
available | [WTS] [JSN] | |||
PCG49_13 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-49-e AI: 7.2 |
available | [WTS] [JSN] | |||
PCG49_14 | Draft LS on 3GPP submission process towards M.2150-2 (IMT-2020) [RP-222613] | other | TSG RAN |
PCG-49-e AI: 9 |
available | [WTS] [JSN] | |||
PCG49_15 | Draft LS on 3GPP submission process towards M.2012-6 (IMT-Advanced) [RP-222615] | other | TSG RAN |
PCG-49-e AI: 9 |
available | [WTS] [JSN] | |||
PCG49_16 | DRAFT LTI reply LS to ITU-R on work towards two new recommendations "Generic unwanted emission characteristics of base stations/mobile stations using the terrestrial radio interfaces of IMT-2020 [SP-220997] | other | TSG SA |
PCG-49-e AI: 9 |
available | [WTS] [JSN] | |||
PCG49_17 | DRAFT LTI on Liaison statement to External Organizations on Development of a draft new Report ITU-R M.[IMT.MULTIMEDIA] - Capabilities of the terrestrial component of IMT-2020 for multimedia communications [SP-221002] | other | TSG SA |
PCG-49-e AI: 9 |
available | [WTS] [JSN] | |||
PCG49_18 | Multiple 3GPP IM memberships by closely related companies | other | ATIS |
PCG-49-e AI: 4.3 |
available | [WTS] [JSN] | |||
PCG49_19 | Content of open 3GPP Releases | Work Plan | 3GPP Work Plan Coordinator |
PCG-49-e AI: 5 |
available | [WTS] [JSN] | |||
PCG49_20 | Work Programme changes since PCG#48 (April 2022) | Work Plan | 3GPP Work Plan Coordinator |
PCG-49-e AI: 6 |
available | [WTS] [JSN] | |||
PCG49_21 | CSAE Standards and CAICV Activities Update | report | CSAE |
PCG-49-e AI: 10 |
available | [WTS] [JSN] | |||
PCG49_22 | COAI MRP Report | report | COAI |
PCG-49-e AI: 10 |
available | [WTS] [JSN] | |||
PCG49_23 | Report from TSG CT |
report revision of PCG49_04 |
CT Chair |
PCG-49-e AI: 4.1 |
available | [WTS] [JSN] | |||
PCG49_24 | 5GMAG MRP Report | report | 5GMAG |
PCG-49-e AI: 10 |
available | [WTS] [JSN] | |||
PCG49_25 | 5GAA status report to 3GPP PCG | report | 5GAA |
PCG-49-e AI: 10 |
available | [WTS] [JSN] | |||
PCG49_26 | 5G Americas MRP Report | report | 5G Americas |
PCG-49-e AI: 10 |
available | [WTS] [JSN] | |||
PCG49_27 | 5G Americas White Paper: Understanding 5G Time Critical Services | other | 5G Americas |
PCG-49-e AI: 10 |
available | [WTS] [JSN] | |||
PCG49_28 | 5G Americas White Paper: Evolving 5G Security for the Cloud | other | 5G Americas |
PCG-49-e AI: 10 |
available | [WTS] [JSN] | |||
PCG49_29 | 5G Americas White Paper: Commercializing 5G Network Slicing | other | 5G Americas |
PCG-49-e AI: 10 |
available | [WTS] [JSN] | |||
PCG4_01r1 | Proposed draft agenda | other | Chairman | PCG-4 | - | [WTS] [JSN] | |||
PCG4_02 | Actions status list | other | Secretary | PCG-4 | - | [WTS] [JSN] | |||
PCG4_03r1 | List of documents | other | Secretary | PCG-4 | - | [WTS] [JSN] | |||
PCG4_04 | Attendees list | other | PCG | PCG-4 | - | [WTS] [JSN] | |||
PCG4_05 | 3GPP TSG meeting calendar | other | Secretary | PCG-4 | - | [WTS] [JSN] | |||
PCG4_06 | IPR recommendations | other | ETSI | PCG-4 | - | [WTS] [JSN] | |||
PCG4_07 | Creation of an IPR register | other | Secretary | PCG-4 | - | [WTS] [JSN] | |||
PCG4_08 | Report from MCC | other | Secretary | PCG-4 | - | [WTS] [JSN] | |||
PCG4_09 | 3GPP Status list after TSG#8 | other | ETSI MCC | PCG-4 | - | [WTS] [JSN] | |||
PCG4_10 | Report to PCG#4 on work in TSG-SA | other | Chairman TSG SA | PCG-4 | - | [WTS] [JSN] | |||
PCG4_11 | 3GPP TSG-CN (Core Network) Management report | other | 3GPP TSG-CN Vice-Chairman, Ian Park | PCG-4 | - | [WTS] [JSN] | |||
PCG4_12 | TSG-RAN#8 Meeting report | other | Yukitsuna Furuya TSG-RAN Chairman NEC Networks | PCG-4 | - | [WTS] [JSN] | |||
PCG4_13 | 3GPP TSG-T (Termninals) Management report | other | 3GPP TSG-T Vice-chairman, Kevin Holley | PCG-4 | - | [WTS] [JSN] | |||
PCG4_14 | Proposed Amendments to the 3GPP Working Procedures | other | Working procedures group chairman | PCG-4 | - | [WTS] [JSN] | |||
PCG4_15 | Communication received from DVB | other | Secretary | PCG-4 | - | [WTS] [JSN] | |||
PCG4_16 | Proposed Work Plan for preparation of a 3G Authentication | other | TSG SA | PCG-4 | - | [WTS] [JSN] | |||
PCG4_17 | Policy regarding contributions from 3GPP to meetings internal to an Organizational Partner's country | other | Committee T1 | PCG-4 | - | [WTS] [JSN] | |||
PCG4_18 | Completion of TDD integration in R'00 | other | CWTS | PCG-4 | - | [WTS] [JSN] | |||
PCG4_19 | ITU-T Ad-hoc coordination status | other | Ericsson | PCG-4 | - | [WTS] [JSN] | |||
PCG4_20 | Co-ordination of OID Handling | other | TSG-CN Chairman | PCG-4 | - | [WTS] [JSN] | |||
PCG4_21r1 | Draft revised summary minutes, decisions and actions from 3GPP PCG#4 meeting, Beijing, 17 July 2000 | other | Secretary | PCG-4 | - | [WTS] [JSN] | |||
PCG50_01 | Draft Agenda | agenda | Chair |
PCG-50 AI: 2 |
available | [WTS] [JSN] | |||
PCG50_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#49-e, held on 27-28 September 2022 | report | Secretary |
PCG-50 AI: 3 |
available | [WTS] [JSN] | |||
PCG50_03 | Actions Status List | other | Secretary |
PCG-50 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG50_04 | Report from TSG CT |
report revised to PCG50_29 |
CT Chair |
PCG-50 AI: 4.1 |
revised | [WTS] [JSN] | |||
PCG50_05 | Report from TSG RAN | report | RAN Chair |
PCG-50 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG50_06 | Report from TSG SA | report | TSG SA Chair |
PCG-50 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG50_07 | DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2012 to Revision 6 [SP-221304, RP-223439] | other | TSG SA |
PCG-50 AI: 9 |
available | [WTS] [JSN] | |||
PCG50_08 | DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2150 to Revision 2 – 5G SRIT [SP-221305, RP-223440] | other | TSG SA |
PCG-50 AI: 9 |
available | [WTS] [JSN] | |||
PCG50_09 | DRAFT LTI on Liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.2150 to Revision 2 – 5G RIT [SP-221306, RP-223441] | other | TSG SA |
PCG-50 AI: 9 |
available | [WTS] [JSN] | |||
PCG50_10 | MRP report from CSAE | report | CSAE |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_11 | PCG Appointment of TSG Chairs and Vice Chairs | other | Secretary |
PCG-50 AI: 4 |
available | [WTS] [JSN] | |||
PCG50_12 | MCC Report | report | Secretary |
PCG-50 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG50_13 | Marketing and Communications Report | report | Marketing and Communications Officer |
PCG-50 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG50_14 | Content of open 3GPP Releases | other | 3GPP Work Plan Coordinator |
PCG-50 AI: 5 |
available | [WTS] [JSN] | |||
PCG50_15 | Work Programme changes since PCG#49 (September 2022) | Work Plan | 3GPP Work Plan Coordinator |
PCG-50 AI: 6 |
available | [WTS] [JSN] | |||
PCG50_16 | LS on 3GPP submission towards IMT-2020 Satellite [RP-230771] | other | TSG RAN |
PCG-50 AI: 9 |
available | [WTS] [JSN] | |||
PCG50_17 | DRAFT LTI on 3GPP submission towards IMT-2020 Satellite [RP-230772, SP-230393] | other | TSG SA |
PCG-50 AI: 9 |
available | [WTS] [JSN] | |||
PCG50_18 | LTI on Liaison statement to External Organizations on Development of a new Report ITU-R M.[IMT.MULTIMEDIA] - Capabilities of the terrestrial component of IMT-2020 for multimedia communications [RP-230773] | other | TSG RAN |
PCG-50 AI: 9 |
available | [WTS] [JSN] | |||
PCG50_19 | Update on 5G-MAG activities | report | 5G-MAG |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_20 | 5G Americas: 3GPP - MRP Report | report | 5G Americas |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_21 | White Paper: Radio Frequency Receiver Performance | report | 5G Americas |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_22 | White Paper: Mid-Band Spectrum Update | report | 5G Americas |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_23 | GSOA MRP Report | report | GSOA |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_24 | OGC MRP Report | report | OGC |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_25 | NGMN MRP Report | report | NGMN |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_26 | TCCA MRP Report | report | TCCA |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_27 | PSCE MRP Report | report | PSCE |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_28 | GSA MRP Report | report | GSA |
PCG-50 AI: 10 |
available | [WTS] [JSN] | |||
PCG50_29 | Report from TSG CT |
report revision of PCG50_04 |
CT Chair |
PCG-50 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG51_01 | Draft Agenda | agenda | Chair |
PCG-51 AI: 2 |
available | [WTS] [JSN] | |||
PCG51_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#50, held on 25 April 2023 | report | Secretary |
PCG-51 AI: 3 |
available | [WTS] [JSN] | |||
PCG51_03 | Actions Status List | other | Secretary |
PCG-51 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG51_04 | Report from TSG CT | report | TSG CT Chair |
PCG-51 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG51_05 | Report from TSG RAN | report | TSG RAN Chair |
PCG-51 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG51_06 | Report from TSG SA | report | TSG SA Chair |
PCG-51 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG51_07 | Changes to the Working Procedures to introduce Voting Limitations on Corporate Groups | other | Working Procedures Convenor |
PCG-51 AI: 8 |
available | [WTS] [JSN] | |||
PCG51_08 | LS reply to TM Forum Liaison: Update on TM Forum Intent Management API and Ontologies – Connector model and 3GPP connector mode | LS in | TSG SA (on behalf of WG SA5) |
PCG-51 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG51_10 | DRAFT LTI on the schedule for updating Recommendation ITU-R M.2012 to revision 7 | response | TSG SA |
PCG-51 AI: 9 |
available | [WTS] [JSN] | |||
PCG51_11 | DRAFT LTI on the schedule for updating Recommendation ITU-R M.2150 to revision 3 | response | TSG SA |
PCG-51 AI: 9 |
available | [WTS] [JSN] | |||
PCG51_12 | MCC Report | report | Secretary |
PCG-51 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG51_13 | Chair and Vice Chairs of 3GPP PCG for 2024 | other | Secretary |
PCG-51 AI: 12 |
available | [WTS] [JSN] | |||
PCG51_14 | 5G Americas MRP Report | report | 5G Americas |
PCG-51 AI: 10 |
available | [WTS] [JSN] | |||
PCG51_15 | 5G Americas White Paper: State of Mobile Network Evolution | other | 5G Americas |
PCG-51 AI: 10 |
available | [WTS] [JSN] | |||
PCG51_16 | 5G Americas White Paper: Transport Networks for 5G | other | 5G Americas |
PCG-51 AI: 10 |
available | [WTS] [JSN] | |||
PCG51_17 | 5G Americas White Paper: Update on 5G Non terrestrial Networks | other | 5G Americas |
PCG-51 AI: 10 |
available | [WTS] [JSN] | |||
PCG51_18 | Content of open 3GPP Releases | other | 3GPP Work Plan Coordinator |
PCG-51 AI: 5 |
available | [WTS] [JSN] | |||
PCG51_19 | Work Plan changes since PCG#50 (April 2023) | Work Plan | 3GPP Work Plan Coordinator |
PCG-51 AI: 6 |
available | [WTS] [JSN] | |||
PCG51_20 | SPG (Sustainable Processes Group) Report | report | SPG Convenor |
PCG-51 AI: 4 |
available | [WTS] [JSN] | |||
PCG51_21 | WP (Working Procedures) Report | report | WP Convenor |
PCG-51 AI: 8 |
available | [WTS] [JSN] | |||
PCG51_22 | MRP report from CSAE | report | CSAE |
PCG-51 AI: 10 |
available | [WTS] [JSN] | |||
PCG51_23 | Reminder on the Need for Balance in TSGs and WGs | other | ATIS |
PCG-51 AI: 8 |
available | [WTS] [JSN] | |||
PCG51_24 | REPLY LIAISON STATEMENT TO THE ALLIANCE FOR TELECOMMUNICATIONS INDUSTRY SOLUTIONS (ATIS) AND EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI) ON 3GPP SUBMISSION TOWARDS IMT-2020 SATELLITE | LS in | ITU-R WP4B |
PCG-51 AI: 9 |
available | [WTS] [JSN] | |||
PCG51_25 | Marketing and Communications Report | report | 3GPP Marketing and Communications Officer |
PCG-51 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG51_26 | Corporate Group Declaration Process | other | MCC |
PCG-51 AI: 8 |
available | [WTS] [JSN] | |||
PCG51_27 | ETSI’s reply on ATIS’s contribution about the Need for Balance in TSGs and WGs | other | ETSI |
PCG-51 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_01 | Draft Agenda | agenda | Chair |
PCG-52 AI: 2 |
available | [WTS] [JSN] | |||
PCG52_02 | Summary minutes, decisions and actions from 3GPP PCG Meeting#51, held on 24-25 October 2023 | report | Secretary |
PCG-52 AI: 3 |
available | [WTS] [JSN] | |||
PCG52_03 | Actions Status List | other | Secretary |
PCG-52 AI: 3.1 |
available | [WTS] [JSN] | |||
PCG52_04 | Report from TSG CT | report | CT Chair |
PCG-52 AI: 4.1 |
available | [WTS] [JSN] | |||
PCG52_05 | Report from TSG RAN | report | RAN Chair |
PCG-52 AI: 4.2 |
available | [WTS] [JSN] | |||
PCG52_06 | Report from TSG SA | report | TSG SA Chair |
PCG-52 AI: 4.3 |
available | [WTS] [JSN] | |||
PCG52_07 | NGMN Liaison Statement to 3GPP regarding a new NGMN Board 6G Publication | LS in | NGMN |
PCG-52 AI: 11 |
available | [WTS] [JSN] | |||
PCG52_08 | NGMN Liaison Statement to 3GPP regarding a new NGMN 6G Publication: "ITU-R Framework for IMT-2030: Review and Future Direction" | LS in | NGMN |
PCG-52 AI: 11 |
available | [WTS] [JSN] | |||
PCG52_09 | DRAFT LTI on 3GPP submission towards IMT-2020 Satellite |
LS out LS is reply to WP4B_TEMP_41 = RP 231521 LS on 3GPP submission towards IMT-2020 Satellite LS To: ITU-R WP4B |
TSG SA |
PCG-52 AI: 9 |
available | [WTS] [JSN] | |||
PCG52_10 | Content of open 3GPP Releases |
other revised to PCG52_30 |
3GPP Work Plan Coordinator |
PCG-52 AI: 5 |
revised | [WTS] [JSN] | |||
PCG52_11 | Work Plan changes since PCG#52 (April 2024) | Work Plan | 3GPP Work Plan Coordinator |
PCG-52 AI: 6 |
available | [WTS] [JSN] | |||
PCG52_12 | MCC Report | report | Secretary |
PCG-52 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG52_13 | Marketing and Communications Report | report | 3GPP Marketing and Communications Officer |
PCG-52 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG52_14 | Working Procedures Report to PCG#52 | report | Working Procedures Group Convenor |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_15 | p-CR on Annex I migration | other | Working Procedures Group |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_16 | p-CR on Annex H changes | other | Working Procedures Group |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_17 | 5G Americas MRP Report | report | 5G Americas |
PCG-52 AI: 10 |
available | [WTS] [JSN] | |||
PCG52_18 | 5G Americas White Paper: The Evolution of 5G Spectrum | other | 5G Americas |
PCG-52 AI: 10 |
available | [WTS] [JSN] | |||
PCG52_19 | 5G Americas White Paper: 3GPP Technology Trends | other | 5G Americas |
PCG-52 AI: 10 |
available | [WTS] [JSN] | |||
PCG52_20 | 5G Americas White Paper: Energy Efficiency and Sustainability in Mobile Communications Networks | other | 5G Americas |
PCG-52 AI: 10 |
available | [WTS] [JSN] | |||
PCG52_21 | 6G logo | other | MCC, 3GPP Marketing and Communications Officer |
PCG-52 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG52_22 | 3GPP Working Procedures: Potential issues related to SWG | discussion | SA Chair |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_23 | Discussion on the leadership balance | other | CCSA |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_24 | Further proposal on 6G logo | other | CCSA |
PCG-52 AI: 7.2 |
available | [WTS] [JSN] | |||
PCG52_25 | TSDSI views on 3GPP TSG/WG leadership balance | other | TSDSI |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_26 | TSDSI views on PCG leadership by rotation | other | TSDSI |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_27 | Discussion on the leadership balance in the 3GPP Working Groups | other | TTA |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_28 | Proposed way forward to address the issue of balance within the 3GPP leadership | other | ETSI |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_29 | Proposal on Regional Balance |
other revised to PCG52_31 |
ATIS |
PCG-52 AI: 8 |
revised | [WTS] [JSN] | |||
PCG52_30 | Content of open 3GPP Releases |
other revision of PCG52_10 |
3GPP Work Plan Coordinator |
PCG-52 AI: 5 |
available | [WTS] [JSN] | |||
PCG52_31 | Proposal on Regional Balance |
other revision of PCG52_29 |
ATIS, ETSI |
PCG-52 AI: 8 |
available | [WTS] [JSN] | |||
PCG52_32 | Proposal on PCG Small Group on Document Handling | other | ATIS |
PCG-52 AI: 7.1 |
available | [WTS] [JSN] | |||
PCG5_01 | Proposed draft agenda | other | Chairman | PCG-5 | - | [WTS] [JSN] | |||
PCG5_02 | Status list of actions arising from PCG#4 | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_03 | List of Documents | other | Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_04 | List of participants | other | PCG | PCG-5 | - | [WTS] [JSN] | |||
PCG5_05 | 3GPP TSG Meeting calendar | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_06 | Report of MCC activities | other | Adrian Scrase | PCG-5 | - | [WTS] [JSN] | |||
PCG5_07 | 3GPP Status list after TSG#9 | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_08 | 3GPP Release packages | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_09 | Content on Release 4 and release 5 | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_10 | Report to PCG#04 on Work in TSG-SA | other | Chairman TSG SA | PCG-5 | - | [WTS] [JSN] | |||
PCG5_11 | TSG CN Management Report | other | TSG-CN chairman | PCG-5 | - | [WTS] [JSN] | |||
PCG5_12 | TSG RAN Management Report | other | TSG RAN chairman | PCG-5 | - | [WTS] [JSN] | |||
PCG5_13 | 3GPP TSG-T Management Report | other | 3GPP TSG-T Vice-chairman, Kevin Holley, 3GPP TSG-T Chairman, Sang-Keun Park | PCG-5 | - | [WTS] [JSN] | |||
PCG5_14 | TSG GERAN Management report | other | 3GPP TSG-GERAN Convenor, Niels Peter Skov Andersen | PCG-5 | - | [WTS] [JSN] | |||
PCG5_15 | Liaison Statement to Relevant external Organizations updating Recommendation ITU-R M.1457 "Detailed specifications of the Radio interfaces of IMT-2000" | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_16 | Liaison Statement to Standard Developing Organizations - Unwanted Emissions | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_17 | Liaison Statement to SDOs, 3GPP and 3GPP2 on Handling of Measurement Uncertainty for the Terrestrial Component of IMT-2000 | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_18 | Proposed change to 3GPP Working procedures | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_19 | Appointment of TSG CN vice-chairman | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_20 | Request for advance of 2001 resources for TTCN testing | other | TSG T chairman | PCG-5 | - | [WTS] [JSN] | |||
PCG5_21 | Updating the IPR register | other | PCG Secretary | PCG-5 | - | [WTS] [JSN] | |||
PCG5_22 | proposed changes to the 3GPP Working Procedures | other | dr Woinsky | PCG-5 | - | [WTS] [JSN] | |||
PCG5_23 | Update procedure for Revision of recommendations ITUI-R M.1457 (detailed Specifications of the radio interfaces of IMT-2000) | other | Fabio Leite, ITU | PCG-5 | - | [WTS] [JSN] | |||
PCG5_24 | 3GPP MRPs 2G > 3G roadmap | other | 3GPP MRPs? | PCG-5 | - | [WTS] [JSN] | |||
PCG5_25 | Report from Market representation Partners | other | 3GPP MRPs | PCG-5 | - | [WTS] [JSN] | |||
PCG5_26re | other | PCG-5 | - | [WTS] [JSN] | |||||
PCG5_27r1 | Draft revised summary minutes, decisions and actions from 3GPP PCG#5 meeting, San Francisco, 14 November 2000 | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_01 | Proposed draft agenda | other | Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_01r1 | Proposed fraft agenda | other | Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_01r2 | Proposed draft agenda | other | Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_01r3 | Proposed draft agenda | other | Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_01r4 | Proposed draft agenda | other | Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_02 | Actions Sattus list | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_03 | List of documents | other | Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_03r1 | List of documents | other | Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_05 | 3GPP TSG Elections results | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_05r1 | 3GPP TSG Elections results | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_06 | Report to PCG#06 on work in TSG-SA | other | Chairman TSG SA | PCG-6 | - | [WTS] [JSN] | |||
PCG6_07 | 3GPP TSG-CN Management report | other | 3GPP TSG-CN Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_08 | TSG-RAN#11 Meeting report to PCG | other | Yukitsuna Furuya TSG-RAN Chairman NEC Networks | PCG-6 | - | [WTS] [JSN] | |||
PCG6_09 | 3GPP TSG-T Management report | other | 3GPP TSG-T chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_10 | TSG-GERAN Management report | other | 3GPP TSG-GERAN chairman, Niels Peter Skov Andersen | PCG-6 | - | [WTS] [JSN] | |||
PCG6_11 | Content of UMTS releases 99, 4 and 5; Project Control methodology | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_12 | 3GPP Release control | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_13 | TTCN Funding for 2001-2003 | other | TSG-T Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_14 | MExE Forum and 3GPP | other | Ronin Wireless (via Secretary) | PCG-6 | - | [WTS] [JSN] | |||
PCG6_15 | Proposed Recommendations from the Ad-hoc group | other | dr Bailey | PCG-6 | - | [WTS] [JSN] | |||
PCG6_16 | Report of MCC Activities | other | MCC (Adrian Scrase) | PCG-6 | - | [WTS] [JSN] | |||
PCG6_17 | Update procedure for revisions of recommendation ITU-R M. 1457 | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_18 | Requirement to provise Assurance for the Global Core Specification as relates to the Recommendation ITU-R M.1457 | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_19 | Announcement of the Establishment of the ITU-IMT 2000 project | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_20 | 3GPP TSG Meeting Calendar | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG6_21 | Liaison Statement to external Organisations and other interested parties - Vocabulary of terms for IMT-2000 | other | ITU | PCG-6 | - | [WTS] [JSN] | |||
PCG6_22 | GSA Survey of Mobile Portal WAP services | other | GSA | PCG-6 | - | [WTS] [JSN] | |||
PCG6_23 | 3GPP Organisational review ad-hoc | other | C.C. Bailey | PCG-6 | - | [WTS] [JSN] | |||
PCG6_24 | Draft Letter back to ITU-T SSG Chairman | other | TSG SA | PCG-6 | - | [WTS] [JSN] | |||
PCG6_25 | The UMTS Third Generation market - Phase 2 | other | Dr Bernd Eylert, UMTS Forum chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_26 | Special Study Group on "IMT-2000 and Beyond" Status report | other | ITU | PCG-6 | - | [WTS] [JSN] | |||
PCG6_27 | PAMF proposal | other | SA1 Chairman | PCG-6 | - | [WTS] [JSN] | |||
PCG6_28 | Workshop "Assessing the requirements for deploying key 3G services" | other | Antonella Napolitano, UMTS Forum 3GPP Coordination Group Chair and Blu SpA | PCG-6 | - | [WTS] [JSN] | |||
PCG6_29r1 | Draft revised minutes, decisions and actions from 3GPP PCG#6 meeting, Sophia Antipolis, 10 April 2001 | other | Secretary | PCG-6 | - | [WTS] [JSN] | |||
PCG7_01r2 | Proposed Draft revised agenda | other | Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_02r1 | List of documents | other | Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_03 | Actions status list | other | Secretary | PCG-7 | - | [WTS] [JSN] | |||
PCG7_05 | TSG SA Management report | other | TSG SA Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_06 | TSG CN Management Report | other | TSG CN Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_07 | TSG RAN Management report | other | TSG RAN Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_08 | TSG T Management report | other | TSG T Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_09 | TSG GERAN Management report | other | TSG GERAN Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_10 | Report of MCC Activities from PCG#6 to PCG#7 | other | MCC (Adrian Scarse) | PCG-7 | - | [WTS] [JSN] | |||
PCG7_11 | 3GPP TSG Meeting Calendar | other | Secretary | PCG-7 | - | [WTS] [JSN] | |||
PCG7_12 | Towards Harmonized IP core network standards | other | ITU-T SSG Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_13 | request for New information for draft recommendation Q.1741.2 (referencing of 3GPP release 4) | other | ITU-T SSG Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_14 | Report of WG ad-hoc group activities | other | Working Procedures ad-hoc group chairman (Yukio Yoshimura) | PCG-7 | - | [WTS] [JSN] | |||
PCG7_15 | MCC review of the Work Plan at Plenaries#13 | other | TSG SA Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_16 | Summary of content of Release 4 | other | TSG SA Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_17 | Development and deployment of TTCN tests for 3GPP terminals | other | TSG T Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_18 | Funding request for MCC task 160 for TTCN development | other | TSG T Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_19 | Request from RAN4 to liaise with CTIA | other | Secretary | PCG-7 | - | [WTS] [JSN] | |||
PCG7_20 | Variations based on national/regional requirements | other | ARIB | PCG-7 | - | [WTS] [JSN] | |||
PCG7_21 | Comment on GERAN related work | other | ARIB, TTC | PCG-7 | - | [WTS] [JSN] | |||
PCG7_22 | Proposed liaison to IANA | other | TSG CN Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_23 | MRPs work update | other | MRP, UMTS Forum Chairman | PCG-7 | - | [WTS] [JSN] | |||
PCG7_24 | About the important decision in the meeting held in USA | other | ARIB | PCG-7 | - | [WTS] [JSN] | |||
PCG7_25r1 | Draft summary minutes, decisions and actions from 3GPP PCG Meeting #7, Tokyo, 8 October 2002 | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG8_01r3 | Draft agenda | other | Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_02r1 | List of documents | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG8_03 | Actions status list | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG8_04 | Attendees list | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG8_05 | Report to PCG#8 on work in TSG SA | other | Chairman TSG SA | PCG-8 | - | [WTS] [JSN] | |||
PCG8_06 | TSG CN Management report | other | TSG CN Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_07 | TSG RAN Management report | other | TSG RAN Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_08 | 3GPP TSG T Management report | other | 3GPP TSG T Chairman, Sang-Keun Park | PCG-8 | - | [WTS] [JSN] | |||
PCG8_09 | TSG GERAN Management report | other | 3GPP TSG GERAN Chairman, Niels Peter Skov Andersen | PCG-8 | - | [WTS] [JSN] | |||
PCG8_10 | Report of MCC Activities for period PCG#7 to PCG#8 | other | MCC (Adrian Scrase) | PCG-8 | - | [WTS] [JSN] | |||
PCG8_11 | TSG Meeting Calendar | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG8_12 | Revised terms of Reference for MCC Task 160 | other | TSG T Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_13 | Draft revised 3GPP working procedures | other | Working procedures group | PCG-8 | - | [WTS] [JSN] | |||
PCG8_14 | 3GPP Work programme for approval by PCG | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG8_15 | Review of Portals Worldwide | other | GSA | PCG-8 | - | [WTS] [JSN] | |||
PCG8_16 | Report on EDGE operators forum | other | GSA | PCG-8 | - | [WTS] [JSN] | |||
PCG8_17 | Recommendations from April 3-4, 2002 IP CN Harmonization workshop | other | TSG CN Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_18 | IETF dependency status | other | TSG CN Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_19 | Presentation on 3GPP/IETF Collaboration from IETF#53 | other | TSG CN Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_20 | Proposed guidelines for 3GPP meetings | other | All TSG chairmen and vice chairmen | PCG-8 | - | [WTS] [JSN] | |||
PCG8_21 | Correspondence with SDOs on C-PDS in Foreign mode | other | Chairman GGRF G95 | PCG-8 | - | [WTS] [JSN] | |||
PCG8_22 | Content of Release 5 | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG8_23 | Content of Rekease 6 | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG8_24 | Communication received from Committee TR.45 concerning the allocation of Electronic Serial Numbers | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG8_25 | Additional TTCN resource requirement for alignment with R99 March '02 version Core Specification | other | 3GPP TSG T Chairman, Sang-Keun Park | PCG-8 | - | [WTS] [JSN] | |||
PCG8_26 | IP-based Multimedia Services: the UMTS Forum's view of a Common Service Concept | other | UMTS Forum | PCG-8 | - | [WTS] [JSN] | |||
PCG8_27 | Response to ITU R WP8F on the schedule for updating Recommendation ITU R M.1457 to Revision 3 | other | TSG RAN Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_28 | TSG GERAN Project Schedule | other | 3GPP TSG GERAN | PCG-8 | - | [WTS] [JSN] | |||
PCG8_29 | Report from Working Procedures ad-hoc group | other | Working Procedures group | PCG-8 | - | [WTS] [JSN] | |||
PCG8_30 | Proposed way forward on IMS and OSA harmonization | other | PCG Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_31 | Information to ITU R WP8F about the ongoing studies within 3GPP on variable duplex spacing | other | ITU-R ad-hoc contact person | PCG-8 | - | [WTS] [JSN] | |||
PCG8_32 | Comments for Long-term evolution ad-hoc meeting | other | TTC | PCG-8 | - | [WTS] [JSN] | |||
PCG8_33 | Request for PCG decision on Harmonisation efforts of OSA APIs work between 3GPP (SA1, CN5) and 3GPP2 (TSG N) | other | 3GPP TSG CN Chairman | PCG-8 | - | [WTS] [JSN] | |||
PCG8_34 | Progress on Coordination and content of timing between 3GPPs and ITU deliverables | other | ITU-T | PCG-8 | - | [WTS] [JSN] | |||
PCG8_35 | Position paper on 3G Portals | other | UMTS Forum | PCG-8 | - | [WTS] [JSN] | |||
PCG8_36 | An Internet top-level domain optimized for mobile use (mTLD) | other | UMTS Forum | PCG-8 | - | [WTS] [JSN] | |||
PCG8_37r1 | Draft revised summary minutes, decisions and actions from 3GPP PCG Meeting#8, New orleans 25 April 2002 | other | Secretary | PCG-8 | - | [WTS] [JSN] | |||
PCG9_01r4 | Draft agenda | other | Chairman | PCG-9 | - | [WTS] [JSN] | |||
PCG9_02r2 | List of Documents | other | Secretary | PCG-9 | - | [WTS] [JSN] | |||
PCG9_03 | Actions Status list | other | Secretary | PCG-9 | - | [WTS] [JSN] | |||
PCG9_04 | Attendees list | other | MCC | PCG-9 | - | [WTS] [JSN] | |||
PCG9_05 | Report to PCG#9 on work in TSG SA | other | Chairman TSG SA | PCG-9 | - | [WTS] [JSN] | |||
PCG9_06 | 3GPP TSG T Management report | other | 3GPP TSG T Chairman, Sang-Keun Park | PCG-9 | - | [WTS] [JSN] | |||
PCG9_07 | TSG RAN#16 and 17 meeting report | other | TSG RAN Chairman | PCG-9 | - | [WTS] [JSN] | |||
PCG9_08 | CN Management Report | other | Stephen Hayes, Chair TSG CN | PCG-9 | - | [WTS] [JSN] | |||
PCG9_09 | TSG GERAN Management report | other | 3GPP TSG GERAN Chairman, Niels Peter Skov Andersen | PCG-9 | - | [WTS] [JSN] | |||
PCG9_10 | Report of MCC Activities for period PCG#8 to PCG#9 | other | MCC (Adrian Scrase) | PCG-9 | - | [WTS] [JSN] | |||
PCG9_11 | 3GPP TSG Meeting calendar | other | Secretary | PCG-9 | - | [WTS] [JSN] | |||
PCG9_12 | Work Programme changes since PCG#8 | other | Secretary | PCG-9 | - | [WTS] [JSN] | |||
PCG9_13 | Status and content of release 5 | other | Secretary | PCG-9 | - | [WTS] [JSN] | |||
PCG9_14 | Status and Content of Release 6 | other | Secretary | PCG-9 | - | [WTS] [JSN] | |||
PCG9_15 | Towards harmonized requirements for MobileIP | other | Chairman ITU T SSG | PCG-9 | - | [WTS] [JSN] | |||
PCG9_16 | TTCN Funding requirement from TSG T | other | TSG T Chairman | PCG-9 | - | [WTS] [JSN] | |||
PCG9_17 | Report to 3GPP | other | Alan Hadden, President GSA | PCG-9 | - | [WTS] [JSN] | |||
PCG9_18 | The EDGE Operators' forum, Overview of EOF, EDGE White Paper | other | Alan Hadden | PCG-9 | - | [WTS] [JSN] | |||
PCG9_19 | Minutes of Future Evolution ad-hoc meeting | other | Future Evolution ad-hoc Convenor | PCG-9 | - | [WTS] [JSN] | |||
PCG9_20 | ITU and 3GPPs - Near and Longer terms | other | John Visser (ITU T) | PCG-9 | - | [WTS] [JSN] | |||
PCG9_21 | TDD ad-hoc group Report | other | UMTS Forum | PCG-9 | - | [WTS] [JSN] | |||
PCG9_22 | Open Mobile Alliance and 3GPP, Open Approach to the Mobile Industry | other | PCG | PCG-9 | - | [WTS] [JSN] | |||
PCG9_23r1 | Draft summary minutes, decisions and actions from 3GPP PCG meeting #9, St Paul de Vence, 3 October 2002 | other | Secretary | PCG-9 | - | [WTS] [JSN] | |||
PCGW05000 | other | PCG-ah-25494 | - | [WTS] [JSN] | |||||
PCGW05001 | other | PCG-ah-25494 | - | [WTS] [JSN] | |||||
PCG_24_Ti | other | PCG-24 | - | [WTS] [JSN] | |||||
T2-010228 | other | T2-12 | - | [WTS] [JSN] |
1535 documents (1.3007400035858 seconds)