Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
SP-080001 | Draft agenda for TSG SA meeting #39 | other | TSG SA Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080002 | Draft report of TSG SA Meeting #38 | other | TSG SA Secretary | SP-39 | - | [WTS] [JSN] | |||
SP-080003 | TSG S4 Status Report at TSG-SA#39 | other | SA WG4 Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080004 | New WID on “Requirements and Test methods for Wideband Terminals” | other | SA WG4 | SP-39 | - | [WTS] [JSN] | |||
SP-080005 | CRs TS 26.114 on "Various Corrections for IMS Multimedia Telephony; Media Handling and Interaction (MTSI-MHI)" (Release 7) | other | SA WG4 | SP-39 | - | [WTS] [JSN] | |||
SP-080006 | CR TS 26.230 on Bug fix to baudot_tonemod function in baudot_functions.c for Cellular text telephone modem; Transmitter bit exact C-code (Release 7) | other | SA WG4 | SP-39 | - | [WTS] [JSN] | |||
SP-080007 | CRs TS 26.234 on "Various Corrections for Packet Switched Streaming Service (Enhancements) (PSSe)" (Release 6 and Release 7) | other | SA WG4 | SP-39 | - | [WTS] [JSN] | |||
SP-080008 | CR TS 26.235 on "Scope clarifications and editorial changes for IMS-Codec" (Release 7) | other | SA WG4 | SP-39 | - | [WTS] [JSN] | |||
SP-080009 | CR TS 26.236 on "Correction of RTP usage for audio for PS conversational multimedia applications for IMS-Codec" (Release 7) | other | SA WG4 | SP-39 | - | [WTS] [JSN] | |||
SP-080010 | CRs TS 26.346 on "Various Corrections for MBMS & MBMS User Service Extensions (MBMSUSE)" (Release 6 and Release 7) | other | SA WG4 | SP-39 | - | [WTS] [JSN] | |||
SP-080011 | CR TS 43.050 on "Correction of wrong references" (Release 7) | other | SA WG4 | SP-39 | - | [WTS] [JSN] | |||
SP-080012 | LS (from SA WG4) regarding 3GPP progress on eCall | other | SA WG4 | SP-39 | - | [WTS] [JSN] | |||
SP-080013 | WiMAX Forum Correspondence. Re: LS on EPC Interworking with WiMAX access networks | other | WiMAX Forum NWG | SP-39 | - | [WTS] [JSN] | |||
SP-080014 | WiMAX Forum Correspondence. Re: WiMAX Forum Multimedia Session Continuity Requirements Release 2.0 version 1.0.0 | other | WiMAX Forum SPWG Chair | SP-39 | - | [WTS] [JSN] | |||
SP-080015 | LS (from TSG GERAN) on the introduction of A interface user plane over IP | other | TSG GERAN | SP-39 | - | [WTS] [JSN] | |||
SP-080016 | Correspondence from ATIS PTSC: RE: Development of Common IMS Standards | other | ATIS PTSC | SP-39 | - | [WTS] [JSN] | |||
SP-080017 | LS (from CT WG1) on PNE Networks | other | CT WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080018 | LS from ITU-T SG19: Request for information for draft new Recommendation Q.1741.5 (referencing of 3GPP Release 7) | other | ITU-T SG19 | SP-39 | - | [WTS] [JSN] | |||
SP-080019 | LS (from TSG RAN) to TSG SA on the documents to be considered for the Revision 8 of Recommendation ITU-R M.1457 | other | TSG RAN | SP-39 | - | [WTS] [JSN] | |||
SP-080020 | LS (from ETSI TISPAN) on requirement on Overlap Signalling | other | ETSI TISPAN | SP-39 | - | [WTS] [JSN] | |||
SP-080021 | Reply LS (from SA WG1) on requirements for overlap signaling | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080022 | LS (from SA WG1) on Transfer of Common IMS document to 3GPP SA WG1 regarding published Rel-1 documents | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080023 | LS (from SA WG1) on Enhancing the SMS Default alphabet in TS 23.038 to include national characters not currently in the Default Alphabet. | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080024 | LS (from SA WG1) on approval of Recommendation Q.1762/Y.2802 | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080025 | Status Report from SA WG1 to TSG SA#39 | other | SA WG1 Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080026 | Stage 1 CRs on (NSP-CR) - Network Selection Enhancements | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080027 | Stage 1 CRs on CR 22.273: Editorial corrections to align to the TISPAN text | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080028 | Stage 1 CR on TCRT: Removal of requirement on sending SMS to non established group calls | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080029 | Stage 1 CRs on (CAT) - Customised Alerting Tone | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080030 | Stage 1 CR on charging requirement for multi-phase services | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080031 | Stage 1 CRs on (CIMS8-TIS) - Service and Capability for Core IMS - inclusion of TISPAN requirements | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080032 | Stage 1 CRs on (Edata) - eCall Data Transfer | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080033 | Stage 1 CR on (EVA) - Enhancements to VGCS Applications | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080034 | Stage 1 CRs on Home(e)NB | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080035 | Stage 1 CR on HNB/HeNB - Closed Subscriber Group (CSG) requirements for UTRA and E-UTRA | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080036 | Stage 1 CRs on (ICE) - Storage and easy access of ICE information on USIM | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080037 | Stage 1 CR on ETSI TISPAN OSA transfer to 3GPP CT5 | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080038 | Stage 1 CRs on (MESSIW) - Service-Level Interworking for Messaging Services | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080039 | Stage 1 CR on (ICSRA) - IMS Centralized Service Control | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080040 | Stage 1 CRs on (IPInterc) - IP Interconnect | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080041 | Stage 1 corrections to TEI-8 items | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080042 | Stage 1 CRs on (SAES) - 3GPP System Architecture Evolution Specification - Evolved Packet System (non RAN aspects) | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080043 | Stage 1 CRs on (TEI8) - Technical Enhancements and Improvements | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080044 | CR 22.173 Stage 1 for Flexible Alerting (FA) Service | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080045 | Stage 1 CRs on Any other Studies (new proposed SIDs here) | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080046 | Stage 1 CR on Correcting a reference in VAS4SMS TR 22.942 | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080047 | VAS4SMS TS 22.142 v.2.0.0 and cover page | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080048 | ETWS TS 22.168v.2.0.0 | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080049 | PWS TR 22.968v.2.0.0 | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080050 | ICS TR 22.892 and Cover Page | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080051 | Enhancements to Multimedia Priority Service (TS 22.153) | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080052 | 3GPP2 Input to Common IMS | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080053 | Charging for multi-phases services | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080054 | Study on support of a Public Warning System | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080055 | Status report of SA WG5 | other | SA WG5 Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080056 | R6/7 CRs on OAM&P (OAM-NIM) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080057 | R7 CRs on Charging Management (CH7) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080058 | R7/8 CRs on OAM&P (OAM7, OAM7-NIM, OAM7-PM, OAM7-Trace) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080059 | R8 CRs on IBCF Charging (IMSTSS) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080060 | R8 CRs on EPC Charging (EPC-CH) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080061 | New WID on EPC Performance measurements | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080062 | New WID on E-UTRAN Performance measurements | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080063 | New WID Key Performance Indicators (KPIs) for E-UTRAN | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080064 | New BB-level WID on Management of Self-Organizing Networks (SON) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080065 | New WT-level WID on Self-Establishment of eNBs | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080066 | New WT-level WID on SON Automatic Neighbour Relation (ANR) Management | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080067 | New WT-level WID on SON Self-Optimization & Self-Healing handling | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080068 | New WID Alignment with eTOM and NGNM | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080069 | R8 CRs on OAM&P (OAM8) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080070 | TS 32.153-100 Telecommunication management; Integration Reference Point (IRP) technology specific templates, rules and guidelines - for SA Information | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080071 | TS 32.121-200 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); Requirements - for SA Approval | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080072 | TS 32.122-200 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); Information Service - for SA Approval | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080073 | TS 32.123-100 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); CORBA Solution Set - for SA Information | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080074 | R8 CRs on Charging Management (CH8) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080075 | TR 32.819-100 Telecommunications management; Element management layer - Operation System Function (E-OSF) definition - for SA Information | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080076 | New WID on Study of Self-healing of SON (OAM8-Studies) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080077 | 22.011 CR0109R3: HNB/HeNB - Closed Subscriber Group (CSG) requirements for UTRA and E-UTRA (Rel-8) | other | Alcatel-Lucent, Nokia Siemens Networks, Motorola, RIM, T-Mobile, Vodafone | SP-39 | - | [WTS] [JSN] | |||
SP-080078 | CR ro 21.801: Correction of ambiguous text | other | MCC (JMM) | SP-39 | - | [WTS] [JSN] | |||
SP-080079 | CR to 21.900: Clarification of version nomenclature | other | MCC (JMM) | SP-39 | - | [WTS] [JSN] | |||
SP-080080 | Reaction to LS from ITU-T: Request for information for draft new Recommendation Q.1741.5 (referencing of 3GPP Release 7) | other | MCC (JMM) | SP-39 | - | [WTS] [JSN] | |||
SP-080081 | Support Team Report | other | MCC (JMM) | SP-39 | - | [WTS] [JSN] | |||
SP-080082 | Specs status at end of SA meeting | other | MCC (JMM) | SP-39 | - | [WTS] [JSN] | |||
SP-080083 | LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.1457 TO REVISION 9 | other | ITU-R WP5D | SP-39 | - | [WTS] [JSN] | |||
SP-080084 | 3GPP2 Correspondence: RE: Common IMS Requirements | other | 3GPP2 TSG-S | SP-39 | - | [WTS] [JSN] | |||
SP-080085 | LS (from SA WG2) on Renaming SAE Interfaces | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080086 | LS response on Core Network Centric Intra Domain Connection of RAN Nodes to Multiple CN Nodes | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080087 | WiMAX Forum Correspondence. Re: WiMAX Forum Multimedia Session Continuity Requirements Release 2.0 version 1.0.0 | other | WiMAX Forum SPWG Chair | SP-39 | - | [WTS] [JSN] | |||
SP-080088 | Report of TSG GERAN activities to TSG SA #39 | other | TSG GERAN Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080089 | Report of SA WG2 activities to TSG SA #39 | other | SA WG2 Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080090 | New WID: System enhancements for the use of IMS services through local breakout | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080091 | Updated Study WID: System enhancements for the use of IMS services in local breakout and optimal routing of media | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080092 | New WID: IMS Service Continuity | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080093 | New WID: MBMS support in EPS for E-UTRAN | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080094 | New Study WID: Intra Domain Connection of RAN Nodes to Multiple CN Nodes | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080095 | Updated WID: IMS System enhancements for corporate network access | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080096 | New WID: 3GPP2 Input to Common IMS | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080097 | New WID: CS Fallback in EPS (TS also sent to TSG SA for information) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080098 | TS 23.272, Version 1.0.0: Circuit Switched Fallback in Evolved Packet System; Stage 2 Specification (Release 8) - For Information | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080099 | TS 23.216, Version 1.0.0: Single Radio Voice Call Continuity (SRVCC); Stage 2 (Release 8) - For Information | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080100 | TR 23.893, Version 1.2.1: Feasibility Study on Multimedia Session Continuity; Stage 2 (Release 8) - For Information | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080101 | TR 23.811, Version 2.0.0: Service Level Interworking for Messaging Services; Stage 2 (Release 8) - For Approval | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080102 | TR 23.892, Version 2.0.0: IP Multimedia System (IMS) centralized services (Release 8) - For Approval | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080103 | 1 CR to 23.060: GGSN selection based on subscription information (TEI8, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080104 | 1 CR to 23.141: Update to the Presence Spec in support of the Common IMS (IMS_Common, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080105 | 2 CRs to 23.167 (EMC1, Rel-7) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080106 | 2 CRs to 23.203: Clarification for PCRF initiated IP-CAN session termination (PCC, Rel-7, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080107 | 10 CRs to 23.203 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080108 | 2 CRs to 23.204: Correction to Reference (TEI7, Rel-7, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080109 | 9 CRs to 23.204 (MESSIW-St2, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080110 | 1 CR to 23.221: Any IP version support (TEI8, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080111 | 2 CRs to 23.228: Cleanup of incorrect P-CSCF behaviour (EMC1, Rel-7, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080112 | 1 CR to 23.228: Cleanup of incorrect P-CSCF interaction (TEI7, Rel-7) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080113 | 4 CRs to 23.228: (TEI8, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080114 | 5 CRs to 23.228: (IMS_Common, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080115 | 7 Category B CRs to 23.401 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080116 | 18 Category C CRs to 23.401 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080117 | 1 Category D CR to 23.401: The editorial modification for attach procedure (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080118 | 15 Category F CRs to 23.401 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080119 | 15 Category F CRs to 23.401 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080120 | 10 Category F CRs to 23.401 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080121 | 9 Category B CRs to 23.402 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080122 | 15 Category C CRs to 23.402 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080123 | 16 Category C CRs to 23.402 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080124 | 12 Category F CRs to 23.402 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080125 | 11 Category F CRs to 23.402 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080126 | 1 Category B CR to 23.401: Subscriber Type on S1 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080127 | 1 Category F CR to 23.401: MME Overload handling (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080128 | 1 Category C CR to 23.402: On IPMS on handover between accesses (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080129 | Stage 1 exception for 3GPP2 Common IMS | other | Telecom Italia, BT, Alcatel-Lucent, KDDI | SP-39 | - | [WTS] [JSN] | |||
SP-080130 | SA3 Status Report to SA#39 | other | SA WG3 Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080131 | Draft Report of SA WG3 Meeting #50 | other | SA WG3 Secretary | SP-39 | - | [WTS] [JSN] | |||
SP-080132 | Updated WID: 3GPP System Architecture Evolution Specification (SAES) to include Security Building blocks based on SP-070933 after accepting revision marks | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080133 | Generic Bootstrapping Architecture Push Function (GBAPush) | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080134 | Security aspects of early IP Multimedia Subsystem (IMS) (Release 8) | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080135 | 3GPP System Architecture Evolution: Security aspects of non-3GPP accesses; (Release 8) | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080136 | WITHDRAWN: IMS media plane security (Release 8) | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080137 | CRs to 33.203 on IMS security enhancements | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080138 | CRs to 33.203 on IMS Security requirements for Packet Cable | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080139 | CRs to 33.203 on correction of integrity protection indicator | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080140 | CR to 33.920 on Addition of 2G GBA related CRs | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080141 | CR to 33.220 on Simultaneous handling of Zh' and Zh in a BSF | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080142 | CRs to 33.210 on adding support for EPS requirements | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080143 | CR to 33.220 and 33.110 on Manual TLS handling | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080144 | CR to 33.234 on using an unauthenticated Diffie_Hellman exchange for emergency calls | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080145 | CR to 33.310 on Introducing a certificates-based Zb-interface and adding IKEv2 | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080146 | CR to 33.259 on corrections on typos on references | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080147 | CR to TS 22.022 on Control key length increase in OTA de-personalisation message | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080148 | CR to 33.110 on Removal of editor | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080149 | CR to 33.246: Clarification of usage of SRTCP in MBMS | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080150 | CR to 33.106 on Alignment of CC encryption statement in ETSI TS 101 671 | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080151 | CRs to 33.107 | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080152 | CR to 33.108 on editorial update | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080153 | IETF Status Report | other | TSG CT Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080154 | Report of TSG CT activities | other | TSG CT Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080155 | LS (from CT WG6) on Release 8 definition of a new framework for UICC services | other | CT WG6 | SP-39 | - | [WTS] [JSN] | |||
SP-080156 | LS (from ETSI TC SCP) on Release 8 definition of a new framework for services | other | TC SCP | SP-39 | - | [WTS] [JSN] | |||
SP-080157 | On release planning | other | Alcatel-Lucent | SP-39 | - | [WTS] [JSN] | |||
SP-080158 | New WID on 3GPP2 Input to Common IMS | other | Alcatel-Lucent | SP-39 | - | [WTS] [JSN] | |||
SP-080159 | WI Status Report: Evaluation of LCS Control Plane Solution for EPS | other | Rapporteur | SP-39 | - | [WTS] [JSN] | |||
SP-080160 | 3GPP System Architecture Evolution: Security Architecture; (Release 8) | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080161 | New WID: IMS initiated and controlled PSS and MBMS User Service | other | Ericsson, RealNetworks, Apple, Huawei Technologies, Orange, Telecom Italia, China Mobile | SP-39 | - | [WTS] [JSN] | |||
SP-080162 | Mobility Mode Protocol Choices in EPC | other | Intel Corp. | SP-39 | - | [WTS] [JSN] | |||
SP-080163 | Mobility Mode Protocol Choices in EPC | other | Intel Corp. | SP-39 | - | [WTS] [JSN] | |||
SP-080164 | TR 22.983, version 2.0.0: Service alignment and migration | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080165 | TS 23.272, Version 1.0.0: Circuit Switched Fallback in Evolved Packet System; Stage 2 Specification (Release 8) - For Information | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080166 | Status Report on PCG/OP process discussions | other | TSG SA Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080167 | 2 CRs to 23.402 (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080168 | 3GPP/3GPP2 Common IMS Workshop Draft MEETING REPORT v1.0.0 | other | TSG SA Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080169 | Conclusions from 3GPP/3GPP2 Common IMS Workshop | other | TSG SA Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080170 | CRs to 33.203 on IMS security enhancements | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080171 | CR to 33.106 on Alignment of CC encryption statement in ETSI TS 101 671 | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080172 | CRs to 33.107 | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080173 | CR to 33.108 on editorial update | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080174 | Focusing SAE work | other | SA WG2 chairman (Balazs Bertenyi), SA WG2 SAE Rapporteurs (Chris Pudney, Irfan Ali) TSG-CT chairman (Hannu Hietalahti) TSG-CT WG1 chairman (Atle Monrad) TSG-CT WG3 chairman (Ragnar Huslende) TSG-CT WG4 chairman (Peter Schmitt) | SP-39 | - | [WTS] [JSN] | |||
SP-080175 | 1 CR to 23.203: Role of the V-PCRF (SAES, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080176 | Proposed Follow-up LS to 3GPP2 Regarding Development of TS 33.xyz(402) ("Security aspects of non-3GPP accesses") | other | Nortel, Alcatel-Lucent, Motorola, Verizon Wireless | SP-39 | - | [WTS] [JSN] | |||
SP-080177 | Planning of SAE workload and future 3GPP releases | other | Vodafone | SP-39 | - | [WTS] [JSN] | |||
SP-080178 | Draft report of TSG CT meeting #39 | other | TSG CT Secretary | SP-39 | - | [WTS] [JSN] | |||
SP-080179 | LS (from TSG CT) Transfer of API work from 3GPP to OMA | other | TSG CT | SP-39 | - | [WTS] [JSN] | |||
SP-080180 | Proposal (from ETSI BOARD IMS-TEST Interest Group) for creation of new Technical Committee for IMS Network Testing (TC INT) | other | ETSI BOARD IMS-TEST Interest Group | SP-39 | - | [WTS] [JSN] | |||
SP-080181 | LS (from ETSI TISPAN) on transfer of charging in common IMS specifications | other | ETSI TISPAN | SP-39 | - | [WTS] [JSN] | |||
SP-080182 | Rel-8 SAE Essential and non Essential work the way forward | other | NTT DoCoMo | SP-39 | - | [WTS] [JSN] | |||
SP-080183 | Draft report of TSG CT meeting #39 | other | TSG CT Secretary | SP-39 | - | [WTS] [JSN] | |||
SP-080184 | Response LS on the creation of new Technical Committee for IMS Network Testing (TC INT) | other | TSG SA (Enrico) | SP-39 | - | [WTS] [JSN] | |||
SP-080185 | ETWS TS 22.168v.2.0.0 | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080186 | Response LS on Transfer of API work from 3GPP to OMA | LS out | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080187 | Calendar of TSG meetings | other | TSG SA Secretary (MCC) | SP-39 | - | [WTS] [JSN] | |||
SP-080188 | 22.011 CR0109R4: HNB/HeNB - Closed Subscriber Group (CSG) requirements for UTRA and E-UTRA (Rel-8) | other | Alcatel-Lucent, Nokia Siemens Networks, Motorola, RIM, T-Mobile, Vodafone | SP-39 | - | [WTS] [JSN] | |||
SP-080189 | Mobility Mode Protocol Choices in EPC | other | Intel, NTT-DoCoMo, Sprint | SP-39 | - | [WTS] [JSN] | |||
SP-080190 | R7 CRs on Charging Management (CH7) | other | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080191 | Stage 1 CRs on CR 22.273: Editorial corrections to align to the TISPAN text | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080192 | Stage 1 CR on charging requirement for multi-phase services | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080193 | Stage 1 CR on (CIMS8-TIS) - Corrections to Interworking with PSTN/ISDN networks | other | SA WG1 | SP-39 | - | [WTS] [JSN] | |||
SP-080194 | CR to TS 22.022 on Control key length increase in OTA de-personalisation message | other | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080195 | Stage 1 CRs on CR 22.273: Editorial corrections to align to the TISPAN text | other | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080196 | Report of TSG RAN activities to TSG SA #39 | other | TSG RAN Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080197 | Draft report of RAN meeting #39 | other | TSG RAN Secretary (MCC) | SP-39 | - | [WTS] [JSN] | |||
SP-080198 | LTE Open issue list | other | TSG RAN Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080199 | LTE-Advanced Work Item Description | other | TSG RAN | SP-39 | - | [WTS] [JSN] | |||
SP-080200 | Summary of discussion on LTE/SAE additional Feature List | other | Session Convenor (Dan Warren GSMA) | SP-39 | - | [WTS] [JSN] | |||
SP-080201 | New WID: IMS initiated and controlled PSS and MBMS User Service | other | Ericsson, RealNetworks, Apple, Huawei Technologies, Orange, Telecom Italia, China Mobile | SP-39 | - | [WTS] [JSN] | |||
SP-080202 | LS on Decision of MBMS and LCS in SAE Rel-8 Scope Discussions | other | TSG SA (NTT DoCoMo) | SP-39 | - | [WTS] [JSN] | |||
SP-080203 | LS informing WGs on the decision on SAE essential items list and procedure for items not included | other | TSG SA (Chairman) | SP-39 | - | [WTS] [JSN] | |||
SP-080204 | R7 CR on OAM&P (OAM-NIM) | other | SA WG5 | SP-39 | - | [WTS] [JSN] | |||
SP-080205 | Stage 1 CR on (CIMS8-TIS) - Corrections to Interworking with PSTN/ISDN networks | other | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080206 | 23.228 CR0772R3: (IMS_Common, Rel-8) | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080207 | CR0772R3 to 23.228: (IMS_Common, Rel-8) | other | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080208 | LS informing WGs on the decision on SAE essential items list and procedure for items not included | other | TSG SA (Chairman) | SP-39 | - | [WTS] [JSN] | |||
SP-080209 | CR on P-CSCF behaviour | other | Ericsson, RIM | SP-39 | - | [WTS] [JSN] | |||
SP-080210 | LS to ATIS PTSC: RE: Handling of LS on Development of Common IMS Standards | other | TSG SA (D Knight) | SP-39 | - | [WTS] [JSN] | |||
SP-080211 | 33.203 CR0129R2 on IMS security enhancements | other | SA WG3 | SP-39 | - | [WTS] [JSN] | |||
SP-080212 | Response LS to WiMAX Forum: 3GPP SAE Rel-8 content | LS out | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080213 | Report of TSG RAN activities to TSG SA #39 | other | TSG RAN Chairman | SP-39 | - | [WTS] [JSN] | |||
SP-080214 | LS to 3GPP2 Regarding Development of TS 33.xyz(402) ("Security aspects of non-3GPP accesses") | other | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080215 | 3GPP work Plan: Version 11 March 2008 | other | Work Plan Manager (MCC) | SP-39 | - | [WTS] [JSN] | |||
SP-080216 | Work Plan Slide Review | other | MCC | SP-39 | - | [WTS] [JSN] | |||
SP-080217 | Rel-7 Feature summary document | other | MCC | SP-39 | - | [WTS] [JSN] | |||
SP-080218 | LS informing WGs on the decision on SAE essential items list and procedure for items not included | LS out | TSG SA (Chairman) | SP-39 | - | [WTS] [JSN] | |||
SP-080219 | LS to ATIS PTSC: RE: Handling of LS on Development of Common IMS Standards | LS out | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080220 | New WID: 3GPP2 Input to Common IMS | other | SA WG2 | SP-39 | - | [WTS] [JSN] | |||
SP-080221 | Response LS on the creation of new Technical Committee for IMS Network Testing (TC INT) | other | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080222 | LS to 3GPP2 Regarding Development of TS 33.xyz(402) ("Security aspects of non-3GPP accesses") | LS out | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080223 | LS on Decision of MBMS and LCS in SAE Rel-8 Scope Discussions | LS out | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080224 | Response LS on the creation of new Technical Committee for IMS Network Testing (TC INT) | LS out | TSG SA | SP-39 | - | [WTS] [JSN] | |||
SP-080225 | Work Plan Slide Review | other | MCC | SP-39 | - | [WTS] [JSN] |
225 documents (1.0904748439789 seconds)