Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S6-212496 SA6 Meeting 46-e Agenda agenda SA6 Chair S6-46-e

AI: 2

noted [WTS] [JSN]
S6-212497 SA6 Meeting 45-bis-e Report report MCC S6-46-e

AI: 3

approved [WTS] [JSN]
S6-212498 SA6 Meeting #46-e - Agenda with Tdocs allocation after submission deadline agenda SA6 Chair S6-46-e

AI: 2

noted [WTS] [JSN]
S6-212499 SA6 Meeting #46-e - Agenda with Tdocs allocation at start of the meeting agenda SA6 Chair S6-46-e

AI: 2

approved [WTS] [JSN]
S6-212500 SA6 Meeting #46-e - Chairman's notes at end of the meeting agenda SA6 Chair S6-46-e

AI: 2

noted [WTS] [JSN]
S6-212501 LS on Prioritized Vehicle to Cloud Technical Solutions LS in

LS To: SA

AECC - Automotive Edge Computing Consortium S6-46-e

AI: 4.1

noted [WTS] [JSN]
S6-212502 APT report on emerging critical applications & use cases of IMT for industrial, societal and enterprise users LS in

source LS: AWG-28/OUT-03 (Rev.1)

LS To: SA6

ASIA-PACIFIC TELECOMMUNITY (AWG-28) S6-46-e

AI: 4.1

noted [WTS] [JSN]
S6-212503 LS on Private call forwarding LS in

source LS: C1-214882

LS To: SA6

LS reply in S6-212690, S6-212805

CT1 eMONASTERY2 Rel-17 S6-46-e

AI: 4.1

replied to [WTS] [JSN]
S6-212504 Reply LS on MBS broadcast service continuity and MBS session identification LS in

source LS: S2-2108175

SA2 NR_MBS-Core, 5MBS Rel-17 S6-46-e

AI: 4.1

noted [WTS] [JSN]
S6-212505 Development of a draft new Report ITU-R M.[IMT.INDUSTRY] –Applications of IMT for specific societal, industrial and enterprise usages LS in

source LS: 5D/TEMP/464(Rev.3)

LS To: 3GPP WG6, RAN, 3GPP2, 4G Americas, 450 MHz Alliance, 5G Autom Assoc., 5G Infrastr. Pub Priv Partnership, 5G Innov Centre, 5G-ACIA, 5G-PPP, 5GAA, 5GMF, 5G Enabled Manuf (5GEM), AAR, Arab Countries Water Util. Assoc., American public power Assoc., APCO, APT Wireless Grp, ARIB, ASMG, ATIS, ATIS Next G Alliance, ATU, BBF, C-Roads, C2C-CC, CEWIT, CCSA, CDG, CEPT/ECC, CITEL, DECT-Forum, EBU, ECMA International, ECO, EHIMA, ERA, ETNO, ETSI, ETSI ERM TG11/TG17/TG28/TG37/TGMR/TGSRR/TGUWB, ETSI ISG MEC, ETSI SC EMTEL, ETSI TC BRAN/DECT/ITS/MSG/RRC/RT/TCCE, EU METIS Project, GSA, GSMA, Hexa-X, iBurst Association, IEC TC65/TC9, IEEE, IETF ITS, IMT-2020 Prom Grp, IMT-2030(6G) Prom Grp, IOWN GF, ISO TC-204/TC-269, ISO/IEC, ITU IRG-AVQA, ITU JCA-AHF, MEF, MFA, MultiFire Alliance, NGMN, NYU Wireless, OASIS, OnGo Alliance, OMA, RAC, Rapa, RCC, SAE C-V2X TC, Telec. Eng. Center, TIA TR-45/TR-45.5/TR-8, TSDSI, TTA, TTC, UIC, WGA, Wi-Fi Alliance, WiMAX Forum, Wireless Innov Forum, WWRF, XGP Forum

ITU-R Working Party (WP) 5D S6-46-e

AI: 4.1

noted [WTS] [JSN]
S6-212506 New KI on change of USS / UTM during flight pCR

revised to S6-212715

InterDigital 23.700-55 0.1.0 FS_eUASAPP Rel-18 S6-46-e

AI: 10.8

revised [WTS] [JSN]
S6-212507 New KI on direct communication between UAVs pCR

revised to S6-212717

InterDigital 23.700-55 0.1.0 FS_eUASAPP Rel-18 S6-46-e

AI: 10.8

revised [WTS] [JSN]
S6-212508 New KI on support for UAV service restriction area pCR

revised to S6-212718

InterDigital 23.700-55 0.1.0 FS_eUASAPP Rel-18 S6-46-e

AI: 10.8

revised [WTS] [JSN]
S6-212509 Disposition Type of specified MCData users CR

revised to S6-212742

TD Tech Ltd 23.282 17.8.0 CR#289 catF eMCData3 Rel-17 S6-46-e

AI: 7.4

revised [WTS] [JSN]
S6-212510 Key issues on exposure network slice capability in the edge data network pCR

revised to S6-212733

AsiaInfo Technologies Inc 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212511 Discussion paper on logging and replay functionality for MC services discussion Ericsson DUMMY Rel-18 S6-46-e

AI: 11

noted [WTS] [JSN]
S6-212512 Solution to KI #6 on application layer QoS verification capability exposure pCR

revised to S6-212736

AsiaInfo,Huawei 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212513 Discussion & proposal on use of 5MBS “service mode” features for MC services discussion AT&T MCOver5MBS Rel-18 S6-46-e

AI: 9.2

noted [WTS] [JSN]
S6-212514 Discussion & proposal on solutions for MC interworking between eMBMS and 5MBS discussion AT&T MCOver5MBS Rel-18 S6-46-e

AI: 9.2

noted [WTS] [JSN]
S6-212515 Architecture for MC/5MBS CR

revised to S6-212762

AT&T 23.289 17.0.0 CR#11 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212516 Text order and wording corrections for ACR scenarios CR

revised to S6-212782

Vodafone España SA 23.558 17.1.0 CR#62 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212517 Correction of Enhanced Status description CR Sepura Ltd 23.283 16.5.0 CR#58 catF eMCCI Rel-16 S6-46-e

AI: 6

withdrawn [WTS] [JSN]
S6-212518 Correction of Enhanced Status description CR

revised to S6-212750

Sepura Ltd 23.283 17.2.0 CR#59 catF eMCCI Rel-17 S6-46-e

AI: 6

revised [WTS] [JSN]
S6-212519 New SID on Service Function Chaining support for Edge Data Networks SID new

revised to S6-212737

Intel Technology India Pvt Ltd Rel-18 S6-46-e

AI: 11

revised [WTS] [JSN]
S6-212520 FS_eEDGEAPP: EAS Dual Application Registration pCR

revision of S6-212380

revised to S6-212738

Intel, Nokia 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212521 Edge Dual Deployment Considerations pCR

revised to S6-212739

Intel Technology India Pvt Ltd 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212522 Edge functional entity relationship to 5G core CR

revised to S6-212783

Vodafone España SA 23.558 17.1.0 CR#63 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212523 Alignment of the term “USS/UTM” throughout TS 23.255 CR InterDigital 23.255 17.1.0 CR#19 catF UASAPP Rel-17 S6-46-e

AI: 7.8

agreed [WTS] [JSN]
S6-212524 Message topic unsubcription CR

revised to S6-212751

Huawei,HiSilicon 23.554 17.0.1 CR#14 catB 5GMARCH Rel-17 S6-46-e

AI: 8.1

revised [WTS] [JSN]
S6-212525 Editoral corrections CR Huawei,HiSilicon 23.554 17.0.1 CR#15 catF 5GMARCH Rel-17 S6-46-e

AI: 8.1

agreed [WTS] [JSN]
S6-212526 Corrections on broadcast CR Huawei,HiSilicon 23.554 17.0.1 CR#16 catF 5GMARCH Rel-17 S6-46-e

AI: 8.1

agreed [WTS] [JSN]
S6-212527 Alignment on Message Gateway IE name CR Huawei, Hisilicon 23.554 17.0.1 CR#17 catF 5GMARCH Rel-17 S6-46-e

AI: 8.1

agreed [WTS] [JSN]
S6-212528 Remove one IE from AS originating message send request CR

revised to S6-212753

Huawei,HiSilicon 23.554 17.0.1 CR#18 catF 5GMARCH Rel-17 S6-46-e

AI: 8.1

revised [WTS] [JSN]
S6-212529 Key issue on support efficient content delivery in edge data network pCR

revised to S6-212735

AsiaInfo,China Mobile 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212530 FFAPP Architecture pCR

revised to S6-212740

ZTE Corporation 23.545 0.1.0 FFAPP Rel-18 S6-46-e

AI: 9.1

revised [WTS] [JSN]
S6-212531 FFAPP functional entities pCR

revised to S6-212741

ZTE Corporation 23.545 0.1.0 FFAPP Rel-18 S6-46-e

AI: 9.1

revised [WTS] [JSN]
S6-212532 FFAPP Reference points pCR ZTE Corporation 23.545 0.1.0 FFAPP Rel-18 S6-46-e

AI: 9.1

approved [WTS] [JSN]
S6-212533 FFAPP External reference points pCR ZTE Corporation 23.545 0.1.0 FFAPP Rel-18 S6-46-e

AI: 9.1

noted [WTS] [JSN]
S6-212534 Correction on EAS description CR

revised to S6-212806

NTT DOCOMO 23.558 17.1.0 CR#64 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212535 New reference point between ECSs pCR

revised to S6-212807

NTT DOCOMO 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212536 Editorial correction to Figure 6.2.1.2-1 pCR NTT DOCOMO 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212537 Presentation of Report to TSG: TR 23.700-95, Version 0.4.0 TS or TR cover SA6 FS_SNAAPP Rel-18 S6-46-e

AI: 12

agreed [WTS] [JSN]
S6-212538 Discussion on the resource owner registration handling function discussion NTT DOCOMO FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

noted [WTS] [JSN]
S6-212539 Clarification of the resource owner registration handling function pCR

revised to S6-212808

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

revised [WTS] [JSN]
S6-212540 Cascade registration pCR NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

postponed [WTS] [JSN]
S6-212541 Updating user consent pCR

revised to S6-212809

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

revised [WTS] [JSN]
S6-212542 Determination of APIs requiring user consent pCR

revised to S6-212810

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

revised [WTS] [JSN]
S6-212543 Evaluation of Solution #1 pCR

revised to S6-212811

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

revised [WTS] [JSN]
S6-212544 Evaluation of Solution #2 pCR

revised to S6-212812

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

revised [WTS] [JSN]
S6-212545 DP on Slice Enabler Layer deployment, role discussion HUAWEI TECHNOLOGIES Co. Ltd. S6-46-e

AI: 10.3

noted [WTS] [JSN]
S6-212546 Add example of KQI translation pCR HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212547 Add solutions of performance and analytics exposure pCR

revised to S6-212764

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212548 Align the terminologies of network slice management exposure pCR

revised to S6-212765

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212549 Solution #8 update: Service KPIs in CAPIF for EAS Service APIs pCR

revised to S6-212720

ETRI, Uangel 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212550 New solution - Interworking with ETSI MEC using CAPIF pCR

revised to S6-212721

ETRI, Uangel 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212551 Pseudo-CR on new KI on Multi-Network Slice Management pCR China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

postponed [WTS] [JSN]
S6-212552 Pseudo-CR on architectural requirements pCR

revised to S6-212761

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212553 Pseudo-CR on security requirements pCR

revised to S6-212763

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212554 MBS architectural and functionalities CR

revised to S6-212562

CBN 23.289 17.0.0 CR#12 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212555 New SID on Application layer support for Personal IoT and Residential Networks SID new

revised to S6-212746

vivo, China Unicom, China Telecom, Spreadtrum Rel-18 S6-46-e

AI: 11

revised [WTS] [JSN]
S6-212556 Study on PIRATESAPP discussion vivo Rel-18 S6-46-e

AI: 11

noted [WTS] [JSN]
S6-212557 Modification on Solution 9 pCR TD Tech Ltd 23.783 1.7.0 FS_MCOver5GS Rel-17 S6-46-e

AI: 10.1

approved [WTS] [JSN]
S6-212558 Update ECS configuration information to support roaming and federation pCR

revised to S6-212747

Samsung 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212559 HR roaming architecture pCR

revised to S6-212748

Samsung 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212560 Handling DNN information configured in AC pCR Samsung 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212561 Service continuity planning allowance pCR

revised to S6-212749

Samsung 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212562 MBS architectural and functionalities CR

revision of S6-212554

revised to S6-212768

CBN 23.289 17.0.0 CR#121 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212563 TS 23.434 Replace the NSCM with NSCE to align the terminologies CR

revised to S6-212766

HUAWEI TECHNOLOGIES Co. Ltd. 23.434 17.3.0 CR#84 catF eSEAL Rel-17 S6-46-e

AI: 7.9

revised [WTS] [JSN]
S6-212564 Key issue on Migration without interconnection pCR

revised to S6-212695

BDBOS 23.700-90 1.1.0 FS_IRail Rel-18 S6-46-e

AI: 10.2

revised [WTS] [JSN]
S6-212565 Solution on offline-Migration pCR

revised to S6-212696

BDBOS 23.700-90 1.1.0 FS_IRail Rel-18 S6-46-e

AI: 10.2

revised [WTS] [JSN]
S6-212566 Overall Evaluation update pCR Nokia, Nokia Shanghai Bell, UIC 23.700-90 1.1.0 FS_IRail Rel-18 S6-46-e

AI: 10.2

approved [WTS] [JSN]
S6-212567 Connection authorisation mechanisms CR

revised to S6-212699

Nokia, Nokia Shanghai Bell 23.280 17.8.0 CR#302 catB MCGWUE Rel-18 S6-46-e

AI: 9.3

revised [WTS] [JSN]
S6-212568 Connection authorisation configuration data CR

revised to S6-212700

Nokia, Nokia Shanghai Bell 23.379 17.8.0 CR#300 catB MCGWUE Rel-18 S6-46-e

AI: 9.3

revised [WTS] [JSN]
S6-212569 Connection authorisation configuration data CR

revised to S6-212701

Nokia, Nokia Shanghai Bell 23.281 17.6.0 CR#159 catB MCGWUE Rel-18 S6-46-e

AI: 9.3

revised [WTS] [JSN]
S6-212570 Connection authorisation configuration data CR

revised to S6-212702

Nokia, Nokia Shanghai Bell 23.282 17.8.0 CR#290 catB MCGWUE Rel-18 S6-46-e

AI: 9.3

revised [WTS] [JSN]
S6-212571 Functional architecture CR Nokia, Nokia Shanghai Bell 23.280 17.8.0 CR#303 catB MCGWUE Rel-18 S6-46-e

AI: 9.3

agreed [WTS] [JSN]
S6-212572 Corrections on network slicing CR

revised to S6-212703

Nokia, Nokia Shanghai Bell 23.289 17.0.0 CR#13 catF MCOver5GS Rel-17 S6-46-e

AI: 7.5

revised [WTS] [JSN]
S6-212573 Request for creation MBS resources for group communications CR

revised to S6-212708

Ericsson 23.289 17.0.0 CR#14 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212574 MBS service announcement procedure CR Ericsson 23.289 17.0.0 CR#15 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

merged [WTS] [JSN]
S6-212575 Request for updating MBS resources for group communications CR Ericsson 23.289 17.0.0 CR#16 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

agreed [WTS] [JSN]
S6-212576 Request to activate or de-activate multicast MBS sessions CR

revised to S6-212709

Ericsson 23.289 17.0.0 CR#17 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212577 KI 7 update pCR China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

postponed [WTS] [JSN]
S6-212578 solution for KI 7 pCR China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

merged [WTS] [JSN]
S6-212579 MBS resources usage and requirements for MC group communications CR Ericsson 23.289 17.0.0 CR#18 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

merged [WTS] [JSN]
S6-212580 new KI on network slice optimization pCR

revised to S6-212722

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212581 pCR on updating solution 8 pCR

revised to S6-212710

Ericsson 23.783 1.7.0 FS_MCOver5GS Rel-17 S6-46-e

AI: 10.1

revised [WTS] [JSN]
S6-212582 solution for network slice optimization pCR

revised to S6-212723

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212583 Solution for KI#9- VAL server authorization and authentication pCR

revised to S6-212724

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212584 MCPTT and MCVideo functional model update to enable MC services over MBS CR Ericsson 23.289 17.0.0 CR#19 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

merged [WTS] [JSN]
S6-212585 solution for KI#3 network slice capability registration and discovery pCR

revised to S6-212725

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212586 Solution evaluation for solution 2 pCR China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

withdrawn [WTS] [JSN]
S6-212587 Solution evaluation for solution 2 pCR

revised to S6-212726

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212588 Solution evaluation for solution 1 pCR China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

withdrawn [WTS] [JSN]
S6-212589 Solution evaluation for solution 1 pCR

revised to S6-212727

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212590 Revised SID for FS_NSCALE SID revised

revised to S6-212728

China Mobile Com. Corporation FS_NSCALE Rel-18 S6-46-e

AI: 11

revised [WTS] [JSN]
S6-212591 solution for KI 14 pCR

revised to S6-212729

China Mobile Com. Corporation 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212592 Update evaluation of solution 4 pCR

revised to S6-212730

China Mobile Com. Corporation 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212593 Solution for KI#12-EAS discovery for different users pCR

revised to S6-212731

China Mobile Com. Corporation 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212594 Support for constrained devices pCR

revised to S6-212732

China Mobile Com. Corporation 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212595 Study on sharing of administrative configuration between interconnected MC service systems SID new

revised to S6-212698

BDBOS Rel-18 S6-46-e

AI: 11

revised [WTS] [JSN]
S6-212596 R18 workload assessment discussion

revised to S6-212780

SA6 Chair S6-46-e

AI: 12

revised [WTS] [JSN]
S6-212597 Reference Correction pCR Samsung Electronics Polska 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212598 new KI on Acknowledgement on Network Slice to 3rd Party pCR Samsung Electronics Polska 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

postponed [WTS] [JSN]
S6-212599 new KI on Network Slice Allocation to the third-party and UE pCR Samsung Electronics Polska 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

postponed [WTS] [JSN]
S6-212600 Clarification on the use of MCData notification server(s) CR

revised to S6-212716

AT&T GNS Belgium SPRL 23.282 17.8.0 CR#291 catF eMCData3 Rel-17 S6-46-e

AI: 7.4

revised [WTS] [JSN]
S6-212601 Correction on Message Aggregation CR

revised to S6-212752

China Mobile Com. Corporation 23.554 17.0.1 CR#19 catF 5GMARCH Rel-17 S6-46-e

AI: 8.1

revised [WTS] [JSN]
S6-212602 Security aspect of MSGin5G align with SA3 CR

revised to S6-212754

China Mobile Com. Corporation 23.554 17.0.1 CR#20 catF 5GMARCH Rel-17 S6-46-e

AI: 8.1

revised [WTS] [JSN]
S6-212603 Correct ACR inconsistencies CR

revised to S6-212775

Ericsson 23.558 17.1.0 CR#65 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212604 Correct EAS required API CR

revised to S6-212776

Ericsson 23.558 17.1.0 CR#66 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212605 EEC context handling in T-EES CR

revised to S6-212779

Ericsson, Samsung, Qualcomm 23.558 17.1.0 CR#67 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212606 New Solution for call forwarding between MCPTT users in different MCPTT systems pCR

revised to S6-212697

Kontron Transportation France, Nokia, Nokia Shanghai Bell 23.700-90 1.1.0 FS_IRail Rel-18 S6-46-e

AI: 10.2

revised [WTS] [JSN]
S6-212607 Solve EN for ACR co-existence CR

revised to S6-212774

Ericsson 23.558 17.1.0 CR#68 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212608 LS on Mission Critical group document content handling for sharing with a partner system LS in

source LS: C1-216220

LS To: SA6

LS reply in S6-212691, S6-212815

CT1 MCSMI_CT Rel-17 S6-46-e

AI: 4.1

replied to [WTS] [JSN]
S6-212609 LS on question and feedback about the EVEX Work Item LS in

LS is reply to C3-215024 (S4-210961)

source LS: C3-215316

LS To: SA4

CT3 Rel-17 S6-46-e

AI: 4.1

noted [WTS] [JSN]
S6-212610 Functional entity responsibilities related to ACR CR

revised to S6-212801

Vodafone España SA 23.558 17.1.0 CR#69 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212611 Complete location retrieval in an area CR Ericsson 23.434 17.3.0 CR#85 catF eSEAL Rel-17 S6-46-e

AI: 7.9

postponed [WTS] [JSN]
S6-212612 Application Server monitoring via CAPIF pCR

revised to S6-212773

Ericsson 23.700-97 0.3.0 FS_ACE_IOT Rel-18 S6-46-e

AI: 10.5

revised [WTS] [JSN]
S6-212613 EDGE-1 and 4 communication via 3GPP system CP pCR

revised to S6-212777

Ericsson 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212614 Traffic influence in initial EAS selection pCR

revised to S6-212778

Ericsson 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212615 New SID on Ad hoc group communication support for mission critical services SID new

revised to S6-212771

Samsung Rel-18 S6-46-e

AI: 11

revised [WTS] [JSN]
S6-212616 Pseudo-CR on optimize the connectivity between MC systems pCR UIC, Nokia, Nokia Shanghai Bell 23.700-90 1.1.0 FS_IRail Rel-18 S6-46-e

AI: 10.2

approved [WTS] [JSN]
S6-212617 Pseudo-CR on interconnection between MC systems pCR UIC, Nokia, Nokia Shanghai Bell, Kontron Transportation France 23.700-90 1.1.0 FS_IRail Rel-18 S6-46-e

AI: 10.2

approved [WTS] [JSN]
S6-212618 Making ECSP ID mandatory CR Nokia, Nokia Shanghai Bell 23.558 17.1.0 CR#70 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

postponed [WTS] [JSN]
S6-212619 Addition of solution to key issue on NAT deployments pCR Nokia, Nokia Shanghai Bell 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212620 New SID on edge computing support for mission critical services SID new

revised to S6-212772

Samsung S6-46-e

AI: 11

revised [WTS] [JSN]
S6-212621 Removal of PCP from TSC stream discovery CR

revised to S6-212820

Ericsson Telecomunicazioni SpA 23.434 17.3.0 CR#86 catF eSEAL Rel-17 S6-46-e

AI: 7.9

revised [WTS] [JSN]
S6-212622 Study on Mission Critical Services over EDGE discussion Samsung S6-46-e

AI: 11

noted [WTS] [JSN]
S6-212623 New solution for enhancements to service continuity planning pCR

revised to S6-212760

KPN N.V. 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212624 Replacing EAS service area with EAS Geographic service area in Solution #7 pCR KPN N.V. 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212625 Solution for KI#9 - Enhancement of dynamic EAS instantiation triggering pCR

revised to S6-212719

InterDigital 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212626 Correction to MCPTT group document for interconnect CR Airbus 23.379 17.8.0 CR#301 catF enh3MCPTT Rel-17 S6-46-e

AI: 7.3

agreed [WTS] [JSN]
S6-212627 Clarification to MC group configuration procedures for interconnect CR

revised to S6-212743

Airbus 23.280 17.8.0 CR#304 catF enh3MCPTT Rel-17 S6-46-e

AI: 7.3

revised [WTS] [JSN]
S6-212628 ACR notify message correction CR

revised to S6-212804

Vodafone España SA 23.558 17.1.0 CR#71 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212629 Pseudo-CR on New Key Issue on detection of subscriber centric API pCR

revision of S6-212110

Samsung 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

postponed [WTS] [JSN]
S6-212630 pCR-SNAPP-Solution to KI#4 pCR

revision of S6-212449

Samsung 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

postponed [WTS] [JSN]
S6-212631 Add missing location area monitoring API CR Samsung 23.434 17.3.0 CR#87 catF eSEAL Rel-17 S6-46-e

AI: 7.9

agreed [WTS] [JSN]
S6-212632 EDGEAPP_EAS_Discovery_Fix CR

revised to S6-212767

Samsung 23.558 17.1.0 CR#72 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212633 Removal of Editor’s Note in Introduction CR InterDigital 23.255 17.1.0 CR#20 catD UASAPP Rel-17 S6-46-e

AI: 7.8

agreed [WTS] [JSN]
S6-212634 Removal of Editor’s Notes in clause 5.2 CR InterDigital 23.755 17.0.0 CR#1 catF UASAPP Rel-17 S6-46-e

AI: 7.8

withdrawn [WTS] [JSN]
S6-212635 EDGEAPP Correlate ACR procedures CR Samsung, Ericsson 23.558 17.1.0 CR#73 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

postponed [WTS] [JSN]
S6-212636 Cancellation Support in ACR CR

revision of S6-212308

revised to S6-212784

Huawei, Hisilicon, China Mobile, China Telecom, CATT 23.558 17.1.0 CR#423 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212637 Adding DNN/S-NSSAI information in EAS profile CR

revision of S6-212413

revised to S6-212785

Huawei, Hisilicon 23.558 17.1.0 CR#562 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212638 Correction to EASID description CR

revision of S6-212313

Huawei, Hisilicon 23.558 17.1.0 CR#591 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

postponed [WTS] [JSN]
S6-212639 Resolving the mismatch of selected ACR scenario between EEC and EAS CR

revision of S6-212315

Huawei, Hisilicon 23.558 17.1.0 CR#611 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

postponed [WTS] [JSN]
S6-212640 Discussion on the way forward of MCOver 5G ProSe discussion Huawei, Hisilicon Rel-18 S6-46-e

AI: 11

noted [WTS] [JSN]
S6-212641 New SID for Study on application enabler aspects to support Smart Grid Applications SID new

revision of S6-212422

revised to S6-212786

Huawei, Hisilicon Rel-18 S6-46-e

AI: 11

revised [WTS] [JSN]
S6-212642 MC service media distribution over 5G MBS CR

revision of S6-212426

Huawei, Hisilicon 23.289 17.0.0 CR#72 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

agreed [WTS] [JSN]
S6-212643 Procedure for MBS session creation and service announcement CR

revision of S6-212423

Huawei, Hisilicon 23.289 17.0.0 CR#32 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

merged [WTS] [JSN]
S6-212644 MC service control signalling over 5G MBS CR

revised to S6-212787

Huawei, Hisilicon 23.289 17.0.0 CR#20 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212645 Multi-server MBS session coordination CR

revised to S6-212788

Huawei, Hisilicon 23.289 17.0.0 CR#21 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212646 Procedure for inter-system mobility between eMBMS and 5G MBS CR

revised to S6-212789

Huawei, Hisilicon 23.289 17.0.0 CR#22 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212647 Missing IE for Realtime UAV status subscription request CR Huawei, Hisilicon 23.255 17.1.0 CR#21 catF UASAPP Rel-17 S6-46-e

AI: 7.8

agreed [WTS] [JSN]
S6-212648 Key issue on data transmission quality measurements pCR

revised to S6-212790

Huawei, Hisilicon 23.700-34 0.1.0 FS_SEALDD Rel-18 S6-46-e

AI: 10.9

revised [WTS] [JSN]
S6-212649 Requirements on support for integration with MSGin5G pCR

revised to S6-212791

Huawei, Hisilicon 23.700-34 0.1.0 FS_SEALDD Rel-18 S6-46-e

AI: 10.9

revised [WTS] [JSN]
S6-212650 Updates to SEALDD architecture to address the Editor’s Note pCR

revised to S6-212792

Huawei, Hisilicon 23.700-34 0.1.0 FS_SEALDD Rel-18 S6-46-e

AI: 10.9

revised [WTS] [JSN]
S6-212651 Solution for KI#5 deployment options of EDGEAPP and ETSI MEC platforms pCR

revised to S6-212793

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212652 Solution for KI#3 - Enhancements to service continuity planning for ACR modification pCR

revised to S6-212794

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212653 Solution for KI#3 - Enhancements to service continuity planning with prediction expiration time pCR

revised to S6-212795

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212654 Evaluation of solution #7 pCR

revised to S6-212796

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212655 Key issue on enhancement to EEL support for application context transmission pCR

revised to S6-212797

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212656 Key issue on sharing location information across VAL servers pCR Huawei, Hisilicon 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

postponed [WTS] [JSN]
S6-212657 Solution on sharing location information across VAL servers pCR Huawei, Hisilicon 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

postponed [WTS] [JSN]
S6-212658 Co-existence of eMBMS and 5G MBS pCR

revised to S6-212798

Huawei, Hisilicon 23.783 1.7.0 FS_MCOver5GS Rel-17 S6-46-e

AI: 10.1

revised [WTS] [JSN]
S6-212659 Conclusion for Service continuity for 4G MBS and 5G MBS pCR Huawei, Hisilicon 23.783 1.7.0 FS_MCOver5GS Rel-17 S6-46-e

AI: 10.1

approved [WTS] [JSN]
S6-212660 Service continuity for broadcast and multicast MBS sessions pCR

revised to S6-212799

Huawei, Hisilicon 23.783 1.7.0 FS_MCOver5GS Rel-17 S6-46-e

AI: 10.1

revised [WTS] [JSN]
S6-212661 Key Issue on V2X service deployment in edge data network pCR Huawei, Hisilicon 23.700-64 0.1.0 FS_eV2XAPP2 Rel-18 S6-46-e

AI: 10.1

approved [WTS] [JSN]
S6-212662 Key Issue on multiple service providers control for ToD pCR

revised to S6-212800

Huawei, Hisilicon 23.700-64 0.1.0 FS_eV2XAPP2 Rel-18 S6-46-e

AI: 10.1

revised [WTS] [JSN]
S6-212663 Removal of Editor’s Notes in clause 5.2 CR InterDigital 23.255 17.1.0 CR#22 catF UASAPP Rel-17 S6-46-e

AI: 7.8

agreed [WTS] [JSN]
S6-212664 EDGEAPP Discussion_on_ACR_Procedures discussion Samsung, Ericsson, Qualcomm EDGEAPP Rel-17 S6-46-e

AI: 7.6

noted [WTS] [JSN]
S6-212665 Solution on MnS discovery via NSCM layer pCR

revised to S6-212755

Lenovo, Motorola Mobility 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212666 Key Issue on slice continuity support pCR

revision of S6-212399

revised to S6-212756

Lenovo, Motorola Mobility 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212667 FS_5GFLS_Architecture Update pCR

revised to S6-212836

Samsung 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

revised [WTS] [JSN]
S6-212668 Removal of Editor’s Notes in clause 7.3 CR

revised to S6-212711

InterDigital 23.255 17.1.0 CR#23 catF UASAPP Rel-17 S6-46-e

AI: 7.8

revised [WTS] [JSN]
S6-212669 Solution on slice continuity support pCR

revised to S6-212757

Lenovo, Motorola Mobility 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212670 FS_ACE_IOT Updates to Application Service Monitoring pCR

revised to S6-212769

Samsung 23.700-97 0.3.0 FS_ACE_IOT Rel-18 S6-46-e

AI: 10.5

revised [WTS] [JSN]
S6-212671 Solution on VAE support for energy efficient V2P communications pCR

revised to S6-212758

Lenovo, Motorola Mobility 23.700-64 0.1.0 FS_eV2XAPP2 Rel-18 S6-46-e

AI: 10.1

revised [WTS] [JSN]
S6-212672 FS_NSCALE_Solution_For_KI#10 pCR

revised to S6-212770

Samsung 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

revised [WTS] [JSN]
S6-212673 Proposal of new open issue for key issue #14 Application traffic influence for initially selected EAS pCR

revised to S6-212813

Samsung Electronics Benelux BV 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212674 Key Issue on support for multi-USS deployments pCR

revised to S6-212781

Lenovo, Motorola Mobility 23.700-55 0.1.0 FS_eUASAPP Rel-18 S6-46-e

AI: 10.8

revised [WTS] [JSN]
S6-212675 Solution on KI #4 - support for fused location service enablement pCR

revised to S6-212759

Lenovo, Motorola Mobility 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

revised [WTS] [JSN]
S6-212676 Corrections to general requirements for service continuity CR

revised to S6-212802

Vodafone España SA 23.558 17.1.0 CR#74 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212677 Pseudo-CR on updates to interface descriptions in solution#1 pCR

revised to S6-212704

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

revised [WTS] [JSN]
S6-212678 Pseudo-CR on fused location service configuration pCR

revised to S6-212705

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

revised [WTS] [JSN]
S6-212679 Pseudo-CR on solution on location service registration pCR

revised to S6-212706

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

revised [WTS] [JSN]
S6-212680 Pseudo-CR on new key issue on support for geo-fencing pCR

revised to S6-212707

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

revised [WTS] [JSN]
S6-212681 New SID on 5G-enabled fused location service capability exposure SID revised

revision of SP-210477

SA6 FS_5GFLS Rel-18 S6-46-e

AI: 11

agreed [WTS] [JSN]
S6-212682 EAS selection synchronization solution pCR

revised to S6-212712

Convida Wireless LLC 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212683 IoT Platform deployments pCR

revised to S6-212713

Convida Wireless LLC 23.700-97 0.3.0 FS_ACE_IOT Rel-18 S6-46-e

AI: 10.5

revised [WTS] [JSN]
S6-212684 IoT Platfrm device triggering KI pCR

revised to S6-212714

Convida Wireless LLC 23.700-97 0.3.0 FS_ACE_IOT Rel-18 S6-46-e

AI: 10.5

revised [WTS] [JSN]
S6-212685 New WID on Mission Critical adhoc group communications WID new Motorola Solutions Germany Rel-18 S6-46-e

AI: 11

noted [WTS] [JSN]
S6-212686 Liaison about Publication of Standard MEF 84 Network Slice Service and Attributes LS in

source LS: LS00319_001

LS To: 3GPP, BBF, ETSI ISGs; ENI, NFV and ZSM, GSMA, IETF, ITU-T SG13, ITU-T SG15, NGMN, ONF, TMF.

MEF Forum S6-46-e

AI: 4.1

postponed [WTS] [JSN]
S6-212687 Further reply on MBS broadcast service continuity LS in

source LS: R2-2111511

RAN2 NR_MBS-Core Rel-17 S6-46-e

AI: 4.1

postponed [WTS] [JSN]
S6-212688 Study on PIRATESAPP discussion vivo Rel-18 S6-46-e

AI: 11

noted [WTS] [JSN]
S6-212689 Reply LS on Bearer pre-emption rate limit issue for GBR bearer establishment in MC systems LS in

source LS: R3-216196

RAN3 enh2MCPTT Rel-16 S6-46-e

AI: 4.1

postponed [WTS] [JSN]
S6-212690 Reply to: LS on Private call forwarding LS out

LS is reply to S6-212503

LS To: CT1

revised to S6-212805

SA6 S6-46-e

AI: 4.2

revised [WTS] [JSN]
S6-212691 Reply to: LS on Mission Critical group document content handling for sharing with a partner system LS out

LS is reply to S6-212608

LS To: CT1

revised to S6-212744

SA6 S6-46-e

AI: 4.2

revised [WTS] [JSN]
S6-212692 LS on reply to SA6 about new SID on Application Enablement for Data Integrity Verification Service in IOT LS in

LS is reply to S6-211496

source LS: S3-214337

LS To: SA6, SA1

SA3 S6-46-e

AI: 4.1

postponed [WTS] [JSN]
S6-212693 Reply LS to CT3 Questions and Feedback on EVEX LS in

source LS: S4-211647

SA4 EVEX S6-46-e

AI: 4.1

postponed [WTS] [JSN]
S6-212694 LS on adhoc group communication LS out

LS To: CT1

SA6 S6-46-e

AI: 4.2

approved [WTS] [JSN]
S6-212695 Key issue on Migration without interconnection pCR

revision of S6-212564

BDBOS 23.700-90 1.1.0 FS_IRail Rel-18 S6-46-e

AI: 10.2

approved [WTS] [JSN]
S6-212696 Solution on offline-Migration pCR

revision of S6-212565

BDBOS 23.700-90 1.1.0 FS_IRail Rel-18 S6-46-e

AI: 10.2

approved [WTS] [JSN]
S6-212697 New Solution for call forwarding between MCPTT users in different MCPTT systems pCR

revision of S6-212606

Kontron Transportation France, Nokia, Nokia Shanghai Bell 23.700-90 1.1.0 FS_IRail Rel-18 S6-46-e

AI: 10.2

approved [WTS] [JSN]
S6-212698 Study on sharing of administrative configuration between interconnected MC service systems SID new

revision of S6-212595

SA6 Rel-18 S6-46-e

AI: 11

agreed [WTS] [JSN]
S6-212699 Connection authorisation mechanisms CR

revision of S6-212567

Nokia, Nokia Shanghai Bell 23.280 17.8.0 CR#3021 catB MCGWUE Rel-18 S6-46-e

AI: 9.3

agreed [WTS] [JSN]
S6-212700 Connection authorisation configuration data CR

revision of S6-212568

Nokia, Nokia Shanghai Bell 23.379 17.8.0 CR#3001 catB MCGWUE Rel-18 S6-46-e

AI: 9.3

agreed [WTS] [JSN]
S6-212701 Connection authorisation configuration data CR

revision of S6-212569

Nokia, Nokia Shanghai Bell 23.281 17.6.0 CR#1591 catB MCGWUE Rel-18 S6-46-e

AI: 9.3

agreed [WTS] [JSN]
S6-212702 Connection authorisation configuration data CR

revision of S6-212570

Nokia, Nokia Shanghai Bell 23.282 17.8.0 CR#2901 catB MCGWUE Rel-18 S6-46-e

AI: 9.3

agreed [WTS] [JSN]
S6-212703 Corrections on network slicing CR

revision of S6-212572

Nokia, Nokia Shanghai Bell 23.289 17.0.0 CR#131 catF MCOver5GS Rel-17 S6-46-e

AI: 7.5

agreed [WTS] [JSN]
S6-212704 Pseudo-CR on updates to interface descriptions in solution#1 pCR

revision of S6-212677

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

approved [WTS] [JSN]
S6-212705 Pseudo-CR on fused location service configuration pCR

revision of S6-212678

revised to S6-212828

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

revised [WTS] [JSN]
S6-212706 Pseudo-CR on solution on location service registration pCR

revision of S6-212679

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

approved [WTS] [JSN]
S6-212707 Pseudo-CR on new key issue on support for geo-fencing pCR

revision of S6-212680

revised to S6-212837

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

revised [WTS] [JSN]
S6-212708 Request for creation MBS resources for group communications CR

revision of S6-212573

Ericsson, Huawei 23.289 17.0.0 CR#141 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

agreed [WTS] [JSN]
S6-212709 Request to activate or de-activate multicast MBS sessions CR

revision of S6-212576

Ericsson 23.289 17.0.0 CR#171 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

agreed [WTS] [JSN]
S6-212710 pCR on updating solution 8 pCR

revision of S6-212581

Ericsson 23.783 1.7.0 FS_MCOver5GS Rel-17 S6-46-e

AI: 10.1

approved [WTS] [JSN]
S6-212711 Removal of Editor’s Notes in clause 7.3 CR

revision of S6-212668

InterDigital 23.255 17.1.0 CR#231 catF UASAPP Rel-17 S6-46-e

AI: 7.8

agreed [WTS] [JSN]
S6-212712 EAS selection synchronization solution pCR

revision of S6-212682

Convida Wireless LLC, CATT 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212713 IoT Platform deployments pCR

revision of S6-212683

revised to S6-212827

Convida Wireless LLC 23.700-97 0.3.0 FS_ACE_IOT Rel-18 S6-46-e

AI: 10.5

revised [WTS] [JSN]
S6-212714 IoT Platfrm device triggering KI pCR

revision of S6-212684

Convida Wireless LLC 23.700-97 0.3.0 FS_ACE_IOT Rel-18 S6-46-e

AI: 10.5

approved [WTS] [JSN]
S6-212715 New KI on change of USS / UTM during flight pCR

revision of S6-212506

InterDigital 23.700-55 0.1.0 FS_eUASAPP Rel-18 S6-46-e

AI: 10.8

merged [WTS] [JSN]
S6-212716 Clarification on the use of MCData notification server(s) CR

revision of S6-212600

AT&T 23.282 17.8.0 CR#2911 catF eMCData3 Rel-17 S6-46-e

AI: 7.4

agreed [WTS] [JSN]
S6-212717 New KI on direct communication between UAVs pCR

revision of S6-212507

InterDigital 23.700-55 0.1.0 FS_eUASAPP Rel-18 S6-46-e

AI: 10.8

approved [WTS] [JSN]
S6-212718 New KI on support for UAV service restriction area pCR

revision of S6-212508

InterDigital 23.700-55 0.1.0 FS_eUASAPP Rel-18 S6-46-e

AI: 10.8

postponed [WTS] [JSN]
S6-212719 Solution for KI#9 - Enhancement of dynamic EAS instantiation triggering pCR

revision of S6-212625

InterDigital 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212720 Solution #8 update: Service KPIs in CAPIF for EAS Service APIs pCR

revision of S6-212549

ETRI, Uangel 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212721 New solution - Interworking with ETSI MEC using CAPIF pCR

revision of S6-212550

revised to S6-212831

ETRI, Uangel 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212722 new KI on network slice optimization pCR

revision of S6-212580

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

postponed [WTS] [JSN]
S6-212723 solution for network slice optimization pCR

revision of S6-212582

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

postponed [WTS] [JSN]
S6-212724 Solution for KI#9- VAL server authorization and authentication pCR

revision of S6-212583

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212725 solution for KI#3 network slice capability registration and discovery pCR

revision of S6-212585

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212726 Solution evaluation for solution 2 pCR

revision of S6-212587

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212727 Solution evaluation for solution 1 pCR

revision of S6-212589

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212728 Revised SID for Network Slice Capability Exposure for Application Layer Enablement SID revised

revision of S6-212590

SA6 FS_NSCALE Rel-18 S6-46-e

AI: 11

agreed [WTS] [JSN]
S6-212729 solution for KI 14 pCR

revision of S6-212591

revised to S6-212829

China Mobile Com. Corporation 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212730 Update evaluation of solution 4 pCR

revision of S6-212592

China Mobile Com. Corporation 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212731 Solution for KI#12-EAS discovery for different users pCR

revision of S6-212593

China Mobile Com. Corporation 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212732 Support for constrained devices pCR

revision of S6-212594

revised to S6-212830

China Mobile Com. Corporation 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212733 Key issues on exposure network slice capability in the edge data network pCR

revision of S6-212510

AsiaInfo Technologies Inc 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212734 Solution to KI #6 on application layer QoS verification capability exposure pCR AsiaInfo,Huawei 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

withdrawn [WTS] [JSN]
S6-212735 Key issue on support efficient content delivery in edge data network pCR

revision of S6-212529

AsiaInfo,China Mobile 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212736 Solution to KI #6 on application layer QoS verification capability exposure pCR

revision of S6-212512

AsiaInfo, Huawei 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212737 New SID on Service Function Chaining support for Edge Data Networks SID new

revision of S6-212519

Intel Technology India Pvt Ltd Rel-18 S6-46-e

AI: 11

postponed [WTS] [JSN]
S6-212738 FS_eEDGEAPP: EAS Dual Application Registration pCR

revision of S6-212520

Intel, Nokia 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212739 Edge Dual Deployment Considerations pCR

revision of S6-212521

revised to S6-212832

Intel Technology India Pvt Ltd 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

revised [WTS] [JSN]
S6-212740 FFAPP Application Architecture pCR

revision of S6-212530

revised to S6-212822

ZTE Corporation 23.545 0.1.0 FFAPP Rel-18 S6-46-e

AI: 9.1

revised [WTS] [JSN]
S6-212741 FFAPP functional entities pCR

revision of S6-212531

ZTE Corporation 23.545 0.1.0 FFAPP Rel-18 S6-46-e

AI: 9.1

approved [WTS] [JSN]
S6-212742 Disposition Type of specified MCData users CR

revision of S6-212509

revised to S6-212816

TD Tech Ltd 23.282 17.8.0 CR#2891 catF eMCData3 Rel-17 S6-46-e

AI: 7.4

revised [WTS] [JSN]
S6-212743 Clarification to MC group configuration procedures for interconnect CR

revision of S6-212627

Airbus 23.280 17.8.0 CR#3041 catF enh3MCPTT Rel-17 S6-46-e

AI: 7.3

agreed [WTS] [JSN]
S6-212744 Reply to: LS on Mission Critical group document content handling for sharing with a partner system LS out

LS is reply to S6-212608

LS To: CT1

revision of S6-212691

revised to S6-212815

SA6 S6-46-e

AI: 4.2

revised [WTS] [JSN]
S6-212745 New SID on Application layer support for Personal IoT and Residential Networks SID new vivo, China Unicom, China Telecom, Spreadtrum Rel-18 S6-46-e

AI: 11

withdrawn [WTS] [JSN]
S6-212746 New SID on Application layer support for Personal IoT and Residential Networks SID new

revision of S6-212555

revised to S6-212838

vivo, China Unicom, China Telecom, Spreadtrum Rel-18 S6-46-e

AI: 11

revised [WTS] [JSN]
S6-212747 Update ECS configuration information to support roaming and federation pCR

revision of S6-212558

Samsung 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212748 HR roaming architecture pCR

revision of S6-212559

Samsung 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212749 Service continuity planning allowance pCR

revision of S6-212561

Samsung 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212750 Correction of Enhanced Status description CR

revision of S6-212518

revised to S6-212821

Sepura Ltd 23.283 17.2.0 CR#591 catF TEI17 Rel-17 S6-46-e

AI: 6

revised [WTS] [JSN]
S6-212751 Message topic unsubcription CR

revision of S6-212524

Huawei,HiSilicon 23.554 17.0.1 CR#141 catB 5GMARCH Rel-17 S6-46-e

AI: 8.1

agreed [WTS] [JSN]
S6-212752 Correction on Message Aggregation CR

revision of S6-212601

China Mobile Com. Corporation 23.554 17.0.1 CR#191 catF 5GMARCH Rel-17 S6-46-e

AI: 8.1

agreed [WTS] [JSN]
S6-212753 Remove one IE from AS originating message send request CR

revision of S6-212528

Huawei,HiSilicon 23.554 17.0.1 CR#181 catF 5GMARCH Rel-17 S6-46-e

AI: 8.1

agreed [WTS] [JSN]
S6-212754 Security aspect of MSGin5G align with SA3 CR

revision of S6-212602

China Mobile Com. Corporation 23.554 17.0.1 CR#201 catF 5GMARCH Rel-17 S6-46-e

AI: 8.1

agreed [WTS] [JSN]
S6-212755 Solution on MnS discovery via NSCM layer pCR

revision of S6-212665

Lenovo, Motorola Mobility, CMCC 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212756 Key Issue on slice continuity support pCR

revision of S6-212666

Lenovo, Motorola Mobility 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

postponed [WTS] [JSN]
S6-212757 Solution on slice continuity support pCR

revision of S6-212669

Lenovo, Motorola Mobility 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

postponed [WTS] [JSN]
S6-212758 Solution on VAE support for energy efficient V2P communications pCR

revision of S6-212671

Lenovo, Motorola Mobility 23.700-64 0.1.0 FS_eV2XAPP2 Rel-18 S6-46-e

AI: 10.1

approved [WTS] [JSN]
S6-212759 Solution on KI #4 - support for fused location service enablement pCR

revision of S6-212675

Lenovo, Motorola Mobility 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

approved [WTS] [JSN]
S6-212760 New solution for enhancements to service continuity planning pCR

revision of S6-212623

KPN N.V. 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212761 Pseudo-CR on architectural requirements pCR

revision of S6-212552

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212762 Architecture for MC/5MBS CR

revision of S6-212515

revised to S6-212823

AT&T 23.289 17.0.0 CR#111 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212763 Pseudo-CR on security requirements pCR

revision of S6-212553

China Mobile Com. Corporation 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212764 Add solutions of performance and analytics exposure pCR

revision of S6-212547

Huawei, China Mobile 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212765 Align the terminologies of network slice management exposure pCR

revision of S6-212548

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212766 TS 23.434 Replace the NSCM with NSCE to align the terminologies CR

revision of S6-212563

HUAWEI TECHNOLOGIES Co. Ltd. 23.434 17.3.0 CR#841 catF eSEAL Rel-17 S6-46-e

AI: 7.9

agreed [WTS] [JSN]
S6-212767 EDGEAPP_EAS_Discovery_Fix CR

revision of S6-212632

Samsung 23.558 17.1.0 CR#721 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212768 MBS architectural and functionalities CR

revision of S6-212562

revised to S6-212824

CBN, Huawei, Hisiliconm, AT&T, Ericsson 23.289 17.0.0 CR#122 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212769 FS_ACE_IOT Updates to Application Service Monitoring pCR

revision of S6-212670

Samsung 23.700-97 0.3.0 FS_ACE_IOT Rel-18 S6-46-e

AI: 10.5

postponed [WTS] [JSN]
S6-212770 FS_NSCALE_Solution_For_KI#10 pCR

revision of S6-212672

Samsung 23.700-99 0.3.0 FS_NSCALE Rel-18 S6-46-e

AI: 10.3

approved [WTS] [JSN]
S6-212771 New SID on Ad hoc group communication support for mission critical services SID new

revision of S6-212615

revised to S6-212839

Samsung Rel-18 S6-46-e

AI: 11

revised [WTS] [JSN]
S6-212772 New SID on edge computing support for mission critical services SID new

revision of S6-212620

Samsung S6-46-e

AI: 11

postponed [WTS] [JSN]
S6-212773 Application Server monitoring via CAPIF pCR

revision of S6-212612

Ericsson 23.700-97 0.3.0 FS_ACE_IOT Rel-18 S6-46-e

AI: 10.5

postponed [WTS] [JSN]
S6-212774 Solve EN for ACR co-existence CR

revision of S6-212607

Ericsson 23.558 17.1.0 CR#681 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

postponed [WTS] [JSN]
S6-212775 Correct ACR inconsistencies CR

revision of S6-212603

Ericsson 23.558 17.1.0 CR#651 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212776 Correct EAS required API CR

revision of S6-212604

Ericsson 23.558 17.1.0 CR#661 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212777 EDGE-1 and 4 communication via 3GPP system CP pCR

revision of S6-212613

Ericsson 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212778 Traffic influence in initial EAS selection pCR

revision of S6-212614

Ericsson 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212779 EEC context handling in T-EES CR

revision of S6-212605

Ericsson, Samsung, Qualcomm 23.558 17.1.0 CR#671 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

merged [WTS] [JSN]
S6-212780 R18 workload assessment discussion

revision of S6-212596

revised to S6-212840

SA6 Chair S6-46-e

AI: 12

revised [WTS] [JSN]
S6-212781 Key Issue on support for multi-USS deployments pCR

revision of S6-212674

revised to S6-212833

Lenovo, Motorola Mobility 23.700-55 0.1.0 FS_eUASAPP Rel-18 S6-46-e

AI: 10.8

revised [WTS] [JSN]
S6-212782 Text order and wording corrections for ACR scenarios CR

revision of S6-212516

revised to S6-212818

Vodafone España SA 23.558 17.1.0 CR#621 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212783 Edge functional entity relationship to 5G core CR

revision of S6-212522

Vodafone España SA 23.558 17.1.0 CR#631 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212784 Cancellation Support in ACR CR

revision of S6-212636

revised to S6-212819

Huawei, Hisilicon, China Mobile, China Telecom, CATT, Convida Wireless, Samsung, Ericsson 23.558 17.1.0 CR#424 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212785 Adding DNN/S-NSSAI information in EAS profile CR

revision of S6-212637

revised to S6-212817

Huawei, Hisilicon 23.558 17.1.0 CR#563 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212786 New SID for Study on application enabler aspects to support Smart Grid Applications SID new

revision of S6-212641

Huawei, Hisilicon Rel-18 S6-46-e

AI: 11

postponed [WTS] [JSN]
S6-212787 MC service control signalling over 5G MBS CR

revision of S6-212644

Huawei, Hisilicon 23.289 17.0.0 CR#201 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

agreed [WTS] [JSN]
S6-212788 Multi-server MBS session coordination CR

revision of S6-212645

revised to S6-212825

Huawei, Hisilicon 23.289 17.0.0 CR#211 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212789 Procedure for inter-system mobility between eMBMS and 5G MBS CR

revision of S6-212646

revised to S6-212835

Huawei, Hisilicon 23.289 17.0.0 CR#221 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

revised [WTS] [JSN]
S6-212790 Key issue on data transmission quality measurements pCR

revision of S6-212648

Huawei, Hisilicon 23.700-34 0.1.0 FS_SEALDD Rel-18 S6-46-e

AI: 10.9

approved [WTS] [JSN]
S6-212791 Key issue on SEALDD and MSGin5G pCR

revision of S6-212649

Huawei, Hisilicon 23.700-34 0.1.0 FS_SEALDD Rel-18 S6-46-e

AI: 10.9

approved [WTS] [JSN]
S6-212792 Updates to SEALDD architecture to address the Editor’s Note pCR

revision of S6-212650

Huawei, Hisilicon 23.700-34 0.1.0 FS_SEALDD Rel-18 S6-46-e

AI: 10.9

approved [WTS] [JSN]
S6-212793 Solution for KI#5 deployment options of EDGEAPP and ETSI MEC platforms pCR

revision of S6-212651

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

merged [WTS] [JSN]
S6-212794 Solution for KI#3 - Enhancements to service continuity planning for ACR modification pCR

revision of S6-212652

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212795 Solution for KI#3 - Enhancements to service continuity planning with prediction expiration time pCR

revision of S6-212653

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212796 Evaluation of solution #7 pCR

revision of S6-212654

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212797 Key issue on enhancement to EEL support for application context transmission pCR

revision of S6-212655

Huawei, Hisilicon 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

postponed [WTS] [JSN]
S6-212798 Co-existence of eMBMS and 5G MBS pCR

revision of S6-212658

Huawei 23.783 1.7.0 FS_MCOver5GS Rel-17 S6-46-e

AI: 10.1

approved [WTS] [JSN]
S6-212799 Service continuity for broadcast and multicast MBS sessions pCR

revision of S6-212660

revised to S6-212841

Huawei 23.783 1.7.0 FS_MCOver5GS Rel-17 S6-46-e

AI: 10.1

revised [WTS] [JSN]
S6-212800 Key Issue on multiple service providers control for ToD pCR

revision of S6-212662

Huawei, Hisilicon 23.700-64 0.1.0 FS_eV2XAPP2 Rel-18 S6-46-e

AI: 10.1

approved [WTS] [JSN]
S6-212801 Functional entity responsibilities related to ACR CR

revision of S6-212610

Vodafone España SA 23.558 17.1.0 CR#691 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212802 Corrections to general requirements for service continuity CR

revision of S6-212676

revised to S6-212834

Vodafone España SA 23.558 17.1.0 CR#741 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

revised [WTS] [JSN]
S6-212803 New Study on Mission Critical adhoc group communications SID new Motorola Solutions Germany Rel-18 S6-46-e

AI: 11

merged [WTS] [JSN]
S6-212804 ACR notify message correction CR

revision of S6-212628

Vodafone España SA 23.558 17.1.0 CR#711 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

postponed [WTS] [JSN]
S6-212805 Reply to: LS on Private call forwarding LS out

LS is reply to S6-212503

LS To: CT1

revision of S6-212690

SA6 eMONASTERY2 Rel-17 S6-46-e

AI: 4.2

approved [WTS] [JSN]
S6-212806 Correction on EAS description CR

revision of S6-212534

NTT DOCOMO 23.558 17.1.0 CR#641 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212807 New reference point between ECSs pCR

revision of S6-212535

NTT DOCOMO 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212808 Clarification of the resource owner registration handling function pCR

revision of S6-212539

revised to S6-212826

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

revised [WTS] [JSN]
S6-212809 Updating user consent pCR

revision of S6-212541

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

approved [WTS] [JSN]
S6-212810 Determination of APIs requiring user consent pCR

revision of S6-212542

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

approved [WTS] [JSN]
S6-212811 Evaluation of Solution #1 pCR

revision of S6-212543

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

approved [WTS] [JSN]
S6-212812 Evaluation of Solution #2 pCR

revision of S6-212544

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

approved [WTS] [JSN]
S6-212813 Proposal of new open issue for key issue #14 Application traffic influence for initially selected EAS pCR

revision of S6-212673

Samsung Electronics Benelux BV 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212814 SA6#46-e Work Plan Review discussion SA6 Chair S6-46-e

AI: 12

noted [WTS] [JSN]
S6-212815 Reply LS on Mission Critical group document content handling for sharing with a partner system LS out

LS is reply to S6-212608

LS To: CT1

revision of S6-212744

SA6 MCSMI_CT Rel-17 S6-46-e

AI: 4.2

approved [WTS] [JSN]
S6-212816 Disposition Type of specified MCData users CR

revision of S6-212742

TD Tech Ltd 23.282 17.8.0 CR#2892 catF eMCData3 Rel-17 S6-46-e

AI: 7.4

agreed [WTS] [JSN]
S6-212817 Adding DNN/S-NSSAI information in EAS profile CR

revision of S6-212785

Huawei, Hisilicon 23.558 17.1.0 CR#564 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212818 Text order and wording corrections for ACR scenarios CR

revision of S6-212782

Vodafone España SA 23.558 17.1.0 CR#622 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212819 Cancellation Support in ACR CR

revision of S6-212784

Huawei, HiSilicon, China Mobile, China Telecom, CATT, Convida Wireless, Samsung, Ericsson, Qualcomm 23.558 17.1.0 CR#425 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212820 Removal of PCP from TSC stream discovery CR

revision of S6-212621

Ericsson Telecomunicazioni SpA 23.434 17.3.0 CR#861 catF eSEAL Rel-17 S6-46-e

AI: 7.9

agreed [WTS] [JSN]
S6-212821 Correction of Enhanced Status description CR

revision of S6-212750

Sepura Ltd 23.283 17.2.0 CR#592 catF TEI17 Rel-17 S6-46-e

AI: 6

agreed [WTS] [JSN]
S6-212822 FFAPP Architecture pCR

revision of S6-212740

ZTE Corporation 23.545 0.1.0 FFAPP Rel-18 S6-46-e

AI: 9.1

approved [WTS] [JSN]
S6-212823 Architecture for MC/5MBS CR

revision of S6-212762

AT&T, CBN 23.289 17.0.0 CR#112 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

agreed [WTS] [JSN]
S6-212824 MBS architectural and functionalities CR

revision of S6-212768

CBN, Huawei, Hisilicon, AT&T, Ericsson 23.289 17.0.0 CR#123 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

agreed [WTS] [JSN]
S6-212825 Multi-server MBS session coordination CR

revision of S6-212788

Huawei, Hisilicon 23.289 17.0.0 CR#212 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

agreed [WTS] [JSN]
S6-212826 Clarification of the resource owner registration handling function pCR

revision of S6-212808

NTT DOCOMO 23.700-95 0.3.0 FS_SNAAPP Rel-18 S6-46-e

AI: 10.4

approved [WTS] [JSN]
S6-212827 IoT Platform deployments pCR

revision of S6-212713

Convida Wireless LLC 23.700-97 0.3.0 FS_ACE_IOT Rel-18 S6-46-e

AI: 10.5

approved [WTS] [JSN]
S6-212828 Pseudo-CR on fused location service configuration pCR

revision of S6-212705

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

approved [WTS] [JSN]
S6-212829 Solution for KI 14 pCR

revision of S6-212729

China Mobile Com. Corporation, Ericsson 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212830 Support for constrained devices pCR

revision of S6-212732

China Mobile Com. Corporation 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212831 New solution - Interworking with ETSI MEC using CAPIF pCR

revision of S6-212721

ETRI, Uangel 23.700-98 0.3.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212832 Edge Dual Deployment Considerations pCR

revision of S6-212739

Intel Technology India Pvt Ltd 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-46-e

AI: 10.7

approved [WTS] [JSN]
S6-212833 Key Issue on support for multi-USS deployments pCR

revision of S6-212781

Lenovo, Motorola Mobility, InterDigital 23.700-55 0.1.0 FS_eUASAPP Rel-18 S6-46-e

AI: 10.8

approved [WTS] [JSN]
S6-212834 Corrections to general requirements for service continuity CR

revision of S6-212802

Vodafone España SA 23.558 17.1.0 CR#742 catF EDGEAPP Rel-17 S6-46-e

AI: 7.6

agreed [WTS] [JSN]
S6-212835 Procedure for inter-system mobility between eMBMS and 5G MBS CR

revision of S6-212789

Huawei, Hisilicon 23.289 17.0.0 CR#222 catB MCOver5MBS Rel-18 S6-46-e

AI: 9.2

agreed [WTS] [JSN]
S6-212836 FS_5GFLS_Architecture Update pCR

revision of S6-212667

Samsung 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

approved [WTS] [JSN]
S6-212837 Pseudo-CR on new key issue on support for geo-fencing pCR

revision of S6-212707

CATT 23.700-96 0.3.0 FS_5GFLS Rel-18 S6-46-e

AI: 10.6

approved [WTS] [JSN]
S6-212838 New SID on Application layer support for Personal IoT and Residential Networks SID new

revision of S6-212746

SA6 Rel-18 S6-46-e

AI: 11

agreed [WTS] [JSN]
S6-212839 New SID on Ad hoc group communication support for mission critical services SID new

revision of S6-212771

SA6 Rel-18 S6-46-e

AI: 11

agreed [WTS] [JSN]
S6-212840 R18 workload assessment discussion

revision of S6-212780

SA6 Chair S6-46-e

AI: 12

endorsed [WTS] [JSN]
S6-212841 Service continuity for broadcast and multicast MBS sessions pCR

revision of S6-212799

Huawei Technologies R&D UK 23.783 1.7.0 FS_MCOver5GS Rel-17 S6-46-e

AI: 10.1

approved [WTS] [JSN]

346 documents (1.1060330867767 seconds)