Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S6-212180 SA6 Meeting 45-bis-e Agenda agenda SA6 Chair S6-45-bis-e

AI: 2

noted [WTS] [JSN]
S6-212181 SA6 Meeting 45-e Report report MCC S6-45-bis-e

AI: 3

approved [WTS] [JSN]
S6-212182 SA6 Meeting #45-bis-e - Agenda with Tdocs allocation after submission deadline agenda SA6 Chair S6-45-bis-e

AI: 2

noted [WTS] [JSN]
S6-212183 SA6 Meeting #45-bis-e - Agenda with Tdocs allocation at start of the meeting agenda SA6 Chair S6-45-bis-e

AI: 2

approved [WTS] [JSN]
S6-212184 SA6 Meeting #45-bis-e - Chairman's notes at end of the meeting agenda SA6 Chair S6-45-bis-e

AI: 2

noted [WTS] [JSN]
S6-212185 LS on information about draft Recommendation ITU-T Y.frd: Framework and Requirements of Network-oriented Data Integrity Verification Service based on Blockchain in Future Network LS in

source LS: SG13-LS212

LS To: ITU-T SG17, 3GPP SA6

ITU-T SG 13 S6-45-bis-e

AI: 4.1

noted [WTS] [JSN]
S6-212186 LS response on MSGin5G store-and-forward clarifications LS in

source LS: S1-213208

LS To: 3GPP SA6

SA1 5GMARCH Rel-17 S6-45-bis-e

AI: 4.1

withdrawn [WTS] [JSN]
S6-212187 LS on EAS and ECS identifiers LS in

source LS: S3-213089

SA3 FS_eEDGE_Sec Rel-17 S6-45-bis-e

AI: 4.1

replied to [WTS] [JSN]
S6-212188 Reply LS on UAS terminology alignment LS in

source LS: S1-213256

LS To: 3GPP SA

SA1 EAV S6-45-bis-e

AI: 4.1

noted [WTS] [JSN]
S6-212189 LS on Prioritized Vehicle to Cloud Technical Solutions LS in

LS To: 3GPP SA

AECC - Automotive Edge Computing Consortium S6-45-bis-e

AI: 4.1

postponed [WTS] [JSN]
S6-212190 APT report on emerging critical applications & use cases of IMT for industrial, societal and enterprise users LS in

source LS: AWG-28/OUT-03 (Rev.1)

LS To: 3GPP SA, SA6

ASIA-PACIFIC TELECOMMUNITY (AWG-28) S6-45-bis-e

AI: 4.1

postponed [WTS] [JSN]
S6-212191 Reply LS pertaining to new SID on Application Enablement for Data Integrity Verification Service in IOT LS in

LS is reply to S1-213195/S6-211496

source LS: S1-213280

LS To: 3GPP SA6 and SA3

SA1 S6-45-bis-e

AI: 4.1

withdrawn [WTS] [JSN]
S6-212192 Reply LS on Inclusive language review LS in

LS is reply to RP-211519

source LS: SP-211140

LS To: 3GPP RAN, CT, SA1, SA2, SA3, SA4, SA5, SA6

3GPP SA TEI17 Rel-17 S6-45-bis-e

AI: 4.1

noted [WTS] [JSN]
S6-212193 Reply LS to 5G-ACIA on 5G capabilities exposure for factories of the future LS in

source LS: SP-211134

3GPP SA S6-45-bis-e

AI: 4.1

noted [WTS] [JSN]
S6-212194 Pseudo-CR on 5G MBS impacts on MC service functional models pCR

revised to S6-212363

Union Inter. Chemins de Fer 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212195 Private call forwarding corrections CR Kontron Transportation France, FirstNet 23.379 17.8.0 CR#297 catF eMONASTERY2 Rel-17 S6-45-bis-e

AI: 7.1

postponed [WTS] [JSN]
S6-212196 Pseudo-CR solution for key issue 1 on optimizing the connectivity between MC systems pCR

revised to S6-212364

UIC (Union Inter. Chemins de Fer), Nokia, Nokia Shanghai Bell 23.700-90 1.0.0 FS_IRail Rel-18 S6-45-bis-e

AI: 10.3

revised [WTS] [JSN]
S6-212197 Revised SID on Study on enhanced architecture for UAS Applications SID revised InterDigital FS_eUASAPP Rel-18 S6-45-bis-e

AI: 11

agreed [WTS] [JSN]
S6-212198 Proposed skeleton for 3GPP TR 23.700-55 draft TR InterDigital FS_eUASAPP Rel-18 S6-45-bis-e

AI: 10.9

approved [WTS] [JSN]
S6-212199 Introduction for 3GPP TR 23.700-55 pCR InterDigital 23.700-55 0.0.0 FS_eUASAPP Rel-18 S6-45-bis-e

AI: 10.9

approved [WTS] [JSN]
S6-212200 Scope for 3GPP TR 23.700-55 pCR InterDigital 23.700-55 0.0.0 FS_eUASAPP Rel-18 S6-45-bis-e

AI: 10.9

approved [WTS] [JSN]
S6-212201 LS on latest progress and outstanding issues in SA WG2 LS in

source LS: S2-2106913

LS To: 3GPP SA4, SA6, CT1

SA2 FS_5GMS_Multicast, 5MBS Rel-17 S6-45-bis-e

AI: 4.1

noted [WTS] [JSN]
S6-212202 correction of references pCR HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

approved [WTS] [JSN]
S6-212203 Add solutions of performance and analytics exposure pCR

revised to S6-212394

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212204 Add solutions of fault management pCR

revised to S6-212393

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212205 Add examples of KQI translation pCR

revised to S6-212392

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212206 Pseudo-CR on correction of the referenced clause of Session with QoS create pCR China Mobile Com. Corporation 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212207 Pseudo-CR on correction of the precondition of the push server address pCR China Mobile Com. Corporation 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212208 Pseudo-CR on new KI on EEL service differentiation framework pCR

revised to S6-212402

China Mobile Com. Corporation 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212209 Pseudo-CR on Application layer support aspect requirements pCR

revised to S6-212404

China Mobile Com. Corporation 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212210 Pseudo-CR on mapping of solutions to key issues pCR China Mobile Com. Corporation 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

approved [WTS] [JSN]
S6-212211 new KI on configuration information provision pCR

revised to S6-212405

China Mobile Com. Corporation 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212212 Pseudo-CR on new KI on enhanced network slice adaptation pCR

revised to S6-212406

China Mobile Com. Corporation 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212213 Pseudo-CR on service based representation of application architecture pCR

revised to S6-212407

China Mobile Com. Corporation 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212214 Corrections to network slice adaptation CR

revised to S6-212408

China Mobile Com. Corporation 23.434 17.3.0 CR#82 catF eSEAL Rel-17 S6-45-bis-e

AI: 7.9

revised [WTS] [JSN]
S6-212215 LS on network slice management service consumption LS out

LS To: 3GPP TSG SA WG5

revised to S6-212409

China Mobile Com. Corporation S6-45-bis-e

AI: 4.2

revised [WTS] [JSN]
S6-212216 Reply LS on EAS and ECS identifiers LS out

LS To: SA3

revised to S6-212447

Ericsson S6-45-bis-e

AI: 4.2

revised [WTS] [JSN]
S6-212217 ECS ID definition CR Ericsson 23.558 17.1.0 CR#49 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

postponed [WTS] [JSN]
S6-212218 Unique EAS ID CR Ericsson 23.558 17.1.0 CR#50 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

postponed [WTS] [JSN]
S6-212219 New KI Energy efficient communication in EC pCR

revised to S6-212445

Ericsson 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212220 New KI Application traffic coordination with 3GPP UP connectivity pCR

revised to S6-212446

Ericsson 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212221 Correction to Disposition Notification handling when LMR system temporarily disables Disposition Notification CR Sepura Ltd 23.283 16.5.0 CR#56 catF eMCCI Rel-16 S6-45-bis-e

AI: 6

agreed [WTS] [JSN]
S6-212222 Correction to Disposition Notification handling when LMR system temporarily disables Disposition Notification CR Sepura Ltd 23.283 17.2.0 CR#57 catA eMCCI Rel-17 S6-45-bis-e

AI: 6

agreed [WTS] [JSN]
S6-212223 Discussion on Rel-18 Work Planning discussion

revised to S6-212437

SA6 Chair Rel-18 S6-45-bis-e

AI: 12

revised [WTS] [JSN]
S6-212224 New SID on Service Function Chaining support for Edge Data Networks SID new

revised to S6-212377

Intel Technology India Pvt Ltd Rel-18 S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212225 Clarification for Location reporting configuration CR BDBOS 23.280 17.8.0 CR#296 catF enh3MCPTT Rel-17 S6-45-bis-e

AI: 7.3

agreed [WTS] [JSN]
S6-212226 EEC triggering for service provisioning pCR

revised to S6-212403

Samsung 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212227 Add an abbreviation for EEL CR Samsung 23.558 17.1.0 CR#51 catD EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

merged [WTS] [JSN]
S6-212228 Remove ENs with no actions in clause 5 CR

revised to S6-212365

Huawei, Hisilicon 23.554 17.0.1 CR#1 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212229 Corrections in clause 7 CR

revised to S6-212366

Huawei, Hisilicon 23.554 17.0.1 CR#2 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212230 Remove EN in clause 9 CR Huawei, Hisilicon 23.554 17.0.1 CR#3 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

postponed [WTS] [JSN]
S6-212231 Proposed TS skeleton for Application layer support for Factories of the Future (FF) pCR

revised to S6-212388

ZTE Corporation 23.545 0.0.0 FFAPP Rel-18 S6-45-bis-e

AI: 9.1

revised [WTS] [JSN]
S6-212232 FFAPP Introduction pCR

revised to S6-212389

ZTE Corporation 23.545 0.0.0 FFAPP Rel-18 S6-45-bis-e

AI: 9.1

revised [WTS] [JSN]
S6-212233 Modifying the functional Entity description for EEC, ECS and EES CR Samsung 23.558 17.1.0 CR#52 catD EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

merged [WTS] [JSN]
S6-212234 FFAPP Scope pCR ZTE Corporation 23.545 0.0.0 FFAPP Rel-18 S6-45-bis-e

AI: 9.1

approved [WTS] [JSN]
S6-212235 FFAPP Architectural requirements pCR

revised to S6-212390

ZTE Corporation 23.545 0.0.0 FFAPP Rel-18 S6-45-bis-e

AI: 9.1

revised [WTS] [JSN]
S6-212236 Removal of editor’s note in clause 7.2.1 pCR BDBOS, Nokia, Nokia Shanghai Bell 23.700-90 1.0.0 FS_IRail Rel-18 S6-45-bis-e

AI: 10.3

approved [WTS] [JSN]
S6-212237 Conclusion for Application architecture and functionality description pCR CBN 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

merged [WTS] [JSN]
S6-212238 Conclusion for 5G MBS session configuration and service annoucement pCR CBN 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

merged [WTS] [JSN]
S6-212239 Modifying the functional Entity description for EEC and ECS CR

revised to S6-212412

Samsung 23.558 17.1.0 CR#53 catD EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212240 5G MBS session configuration and service announcement CR CBN 23.289 17.0.0 CR#1 catB MCOver5MBS Rel-18 S6-45-bis-e

AI: 9.2

merged [WTS] [JSN]
S6-212241 Deployment scenarios for roaming pCR

revised to S6-212456

NTT DOCOMO 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212242 Mapping of Solutions to Key Issues pCR NTT DOCOMO 23.700-95 0.2.0 FS_SNAAPP Rel-18 S6-45-bis-e

AI: 10.5

approved [WTS] [JSN]
S6-212243 Obtaining user consent via CAPIF-8 pCR

revised to S6-212457

NTT DOCOMO 23.700-95 0.2.0 FS_SNAAPP Rel-18 S6-45-bis-e

AI: 10.5

revised [WTS] [JSN]
S6-212244 UE obtaining onboarding enrolment information pCR NTT DOCOMO 23.700-95 0.2.0 FS_SNAAPP Rel-18 S6-45-bis-e

AI: 10.5

noted [WTS] [JSN]
S6-212245 MBS architectural and functionalities CR

revised to S6-212436

CBN 23.289 17.0.0 CR#2 catB MCOver5MBS Rel-18 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212246 Evalutation on solution #1 pCR

revised to S6-212411

Samsung 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212247 ECS discovery in roaming scenario pCR Samsung 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

merged [WTS] [JSN]
S6-212248 FS_eEDGEAPP: EAS Dual Registration pCR

revised to S6-212380

Intel, Nokia 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212249 List of subscriptions to the CN in EEC context CR

revised to S6-212410

Samsung 23.558 17.1.0 CR#54 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212250 Clarification for location reporting within MBSFN CR BDBOS 23.280 17.8.0 CR#297 catF enh3MCPTT Rel-17 S6-45-bis-e

AI: 7.3

agreed [WTS] [JSN]
S6-212251 Addition of a list of requested ECSPs to the service provisioning request discussion Apple GmbH Rel-17 S6-45-bis-e

AI: 7.6

noted [WTS] [JSN]
S6-212252 Addition of Requested ECSPs to the service provisioning request CR

revised to S6-212369

Apple GmbH 23.558 17.1.0 CR#55 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212253 Private call end-to-end encryption pCR Nokia, Nokia Shanghai Bell, BDBOS 23.700-90 1.0.0 FS_IRail Rel-18 S6-45-bis-e

AI: 10.3

approved [WTS] [JSN]
S6-212254 Use of the same functional alias in multiple MC systems pCR Nokia, Nokia Shanghai Bell, BDBOS 23.700-90 1.0.0 FS_IRail Rel-18 S6-45-bis-e

AI: 10.3

approved [WTS] [JSN]
S6-212255 Addition of definitions and introduction related to MC Gateway UE CR

revised to S6-212383

Samsung, Nokia, Nokia Shanghai Bell 23.280 17.8.0 CR#298 catB MCGWUE Rel-18 S6-45-bis-e

AI: 9.3

revised [WTS] [JSN]
S6-212256 Introduction of sub clauses to capture MC gateway UE function details CR

revised to S6-212384

Samsung, Nokia, Nokia Shanghai Bell, BDBOS 23.280 17.8.0 CR#299 catB MCGWUE Rel-18 S6-45-bis-e

AI: 9.3

revised [WTS] [JSN]
S6-212257 MCGWUE_3GPP access network related location management CR Samsung, Nokia, Nokia Shanghai Bell, FirstNet, BDBOS, AT&T 23.280 17.8.0 CR#300 catB MCGWUE Rel-18 S6-45-bis-e

AI: 9.3

agreed [WTS] [JSN]
S6-212258 Pseudo-CR on Private call using functional alias towards a partner MC system pCR

revised to S6-212386

AT&T GNS Belgium SPRL 23.700-90 1.0.0 FS_IRail Rel-18 S6-45-bis-e

AI: 10.3

revised [WTS] [JSN]
S6-212259 Clarify MCData service delivery for offline users and delivery notification CR AT&T GNS Belgium SPRL 23.282 17.8.0 CR#287 catF eMCData3 Rel-17 S6-45-bis-e

AI: 7.4

agreed [WTS] [JSN]
S6-212260 Missing information table for the notification message CR

revised to S6-212387

AT&T GNS Belgium SPRL 23.282 17.8.0 CR#288 catF eMCData3 Rel-17 S6-45-bis-e

AI: 7.4

revised [WTS] [JSN]
S6-212261 Further observations on dedicated EPS Bearer set up in MC systems discussion HOME OFFICE Rel-18 S6-45-bis-e

AI: 11

noted [WTS] [JSN]
S6-212262 Pseudo-CR on update solution 25 related to MBS session update aspects pCR

revised to S6-212375

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212263 Pseudo-CR on multicast MBS session activation and deactivation aspects for group communications pCR Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212264 Pseudo-CR on Inter-system mobility between LTE and 5G pCR

revised to S6-212376

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212265 update solution 10 related to MBS session configuration and service announcement pCR Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212266 Pseudo-CR on Solution to Key issue #4: Information provided by the AC for service provisioning, EEC registration and EAS discovery pCR

revised to S6-212368

Apple GmbH 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212267 Pseudo-CR on update solution 11 related to MC service group data transmission over 5G MBS sessions pCR Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212268 Pseudo-CR on Service continuity for broadcast and multicast MBS sessions pCR Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212269 Pseudo-CR on overall evaluation pCR

revised to S6-212378

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212270 Pseudo-CR on Conclusions pCR

revised to S6-212379

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212271 Pseudo-CR on update solution 24 related to 5G MBS session release aspects pCR

revised to S6-212381

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212272 Pseudo-CR on update KI#13 pCR Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212273 New SID on Study on Application Data Analytics Enablement Service SID new

revision of S6-212088

revised to S6-212396

Lenovo, Motorola Mobility Rel-18 S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212274 Key Issue on support for VRU high risk zones pCR

revised to S6-212397

Lenovo, Motorola Mobility 23.700-64 0.0.0 FS_eV2XAPP2 Rel-18 S6-45-bis-e

AI: 10.11

revised [WTS] [JSN]
S6-212275 Key Issue on support for energy efficient V2P communications pCR

revised to S6-212398

Lenovo, Motorola Mobility 23.700-64 0.0.0 FS_eV2XAPP2 Rel-18 S6-45-bis-e

AI: 10.11

revised [WTS] [JSN]
S6-212276 Key Issue on slice continuity support pCR

revised to S6-212399

Lenovo, Motorola Mobility 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212277 Solution to KI #8 on API translation pCR

revised to S6-212400

Lenovo, Motorola Mobility 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212278 Discussion on alignment with ETSI MEC discussion Lenovo, Motorola Mobility S6-45-bis-e

AI: 10.8

noted [WTS] [JSN]
S6-212279 Solution to KI #3 on service continuity planning enhancements pCR

revised to S6-212401

Lenovo, Motorola Mobility 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212280 LS on Concerns of scalability issues when serving mission critical users over multicast MBS sessions LS out

LS To: SA2

revised to S6-212382

Ericsson Rel-17 S6-45-bis-e

AI: 4.2

revised [WTS] [JSN]
S6-212281 Multicast RAN scalability issue discussion Ericsson Rel-17 S6-45-bis-e

AI: 4.2

noted [WTS] [JSN]
S6-212282 Configuration parameters for supporting ad hoc group call CR Samsung, FirstNet 23.379 17.8.0 CR#298 catB enh3MCPTT Rel-18 S6-45-bis-e

AI: 11

postponed [WTS] [JSN]
S6-212283 Add definition of MSGin5G Server address CR

revised to S6-212438

China Mobile Com. Corporation 23.554 17.0.1 CR#4 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212284 Correction on clause 5.3.2.2 target resolution CR

revised to S6-212440

China Mobile Com. Corporation 23.554 17.0.1 CR#5 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212285 New solution: EAS Service API enablement using CAPIF pCR

revised to S6-212367

ETRI, Uangel 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212286 Information flows and procedures for ad hoc group call CR Samsung, FirstNet 23.379 17.8.0 CR#299 catB enh3MCPTT Rel-18 S6-45-bis-e

AI: 11

postponed [WTS] [JSN]
S6-212287 Correction on message delivery procedure to Message Gateway CR

revised to S6-212441

China Mobile Com. Corporation 23.554 17.0.1 CR#6 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212288 Editorial of MSGin5G CR

revised to S6-212466

China Mobile Com. Corporation 23.554 17.0.1 CR#7 catD 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212289 Remove API Related EN CR

revised to S6-212442

China Mobile Com. Corporation 23.554 17.0.1 CR#8 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212290 Remove ENs with no action CR China Mobile Com. Corporation 23.554 17.0.1 CR#9 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

postponed [WTS] [JSN]
S6-212291 New solution for enhacments to service continuity planning pCR

revised to S6-212374

KPN N.V. 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212292 Correction on clause 8.3.3 CR

revised to S6-212443

China Mobile Com. Corporation 23.554 17.0.1 CR#10 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212293 Correction on clause 8.7.5 CR

revised to S6-212444

China Mobile Com. Corporation 23.554 17.0.1 CR#11 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212294 Addition of key issue pertaining to NAT deployments pCR

revised to S6-212458

Nokia, Nokia Shanghai Bell 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212295 Pseudo-CR on functional architecture update in solution #1 pCR

revised to S6-212395

CATT 23.700-96 0.2.0 FS_5GFLS Rel-18 S6-45-bis-e

AI: 10.7

revised [WTS] [JSN]
S6-212296 Pseudo-CR on new key issue on initialization and configuration for location service pCR CATT 23.700-96 0.2.0 FS_5GFLS Rel-18 S6-45-bis-e

AI: 10.7

approved [WTS] [JSN]
S6-212297 5GMARCH_CR_SEAL Group Deletion procedure CR

revised to S6-212448

Samsung 23.434 17.3.0 CR#83 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212298 Pseudo-CR on update to KI#1 pCR CATT 23.700-96 0.2.0 FS_5GFLS Rel-18 S6-45-bis-e

AI: 10.7

approved [WTS] [JSN]
S6-212299 pCR-SNAPP-Solution to KI#4 pCR

revised to S6-212449

Samsung 23.700-95 0.2.0 FS_SNAAPP Rel-18 S6-45-bis-e

AI: 10.5

revised [WTS] [JSN]
S6-212300 ACE_IOT_Solution for KI#2 - Application server monitoring and control of traffic pCR

revised to S6-212450

Samsung 23.700-97 0.2.0 FS_ACE_IOT Rel-18 S6-45-bis-e

AI: 10.6

revised [WTS] [JSN]
S6-212301 eEDGEAPP_New KI on enabler layer support for EAS sync pCR

revised to S6-212451

Samsung 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212302 5GFLS_solution for KI#1 - Functional architecture for fused location service leveraging SEAL pCR

revised to S6-212452

Samsung 23.700-96 0.2.0 FS_5GFLS Rel-18 S6-45-bis-e

AI: 10.7

revised [WTS] [JSN]
S6-212303 Revised SID on Enhanced architecture for enabling Edge Applications SID revised

revised to S6-212453

Samsung FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212304 eSEAL2 WID proposal WID new

revised to S6-212454

Samsung Rel-18 S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212305 MCGWUE_MBMS support for MC clients residing on non-3GPP devices CR

revised to S6-212385

Samsung 23.280 17.8.0 CR#301 catB MCGWUE Rel-18 S6-45-bis-e

AI: 9.3

revised [WTS] [JSN]
S6-212306 New WID on Enhanced Mission Critical Push-to-talk architecture phase 4 WID new

revised to S6-212455

Motorola Solutions Germany Rel-18 S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212307 UEs hosting multiple EECs KI pCR

revised to S6-212370

Convida Wireless LLC 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212308 Cancellation Support in ACR CR

revision of S6-212123

revised to S6-212636

Huawei, HiSilicon, China Mobile, China Telecom, CATT 23.558 17.1.0 CR#422 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

postponed [WTS] [JSN]
S6-212309 ACR identification CR

revision of S6-212124

Huawei, HiSilicon, China Mobile, China Telecom, CATT 23.558 17.1.0 CR#432 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

postponed [WTS] [JSN]
S6-212310 Adding DNN/S-NSSAI information in EAS profile CR

revised to S6-212413

Huawei, Hisilicon 23.558 17.1.0 CR#56 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212311 Correction on ACR failure alleviation mechanisms CR

revised to S6-212414

Huawei, Hisilicon 23.558 17.1.0 CR#57 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212312 Correction on ACR information subscription request CR

revised to S6-212415

Huawei, Hisilicon 23.558 17.1.0 CR#58 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212313 Correction on EASID description CR

revised to S6-212638

Huawei, Hisilicon 23.558 17.1.0 CR#59 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

postponed [WTS] [JSN]
S6-212314 Correction on connectivity information CR Huawei, Hisilicon 23.558 17.1.0 CR#60 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

agreed [WTS] [JSN]
S6-212315 Resolving the mismatch of selected ACR scenario between EEC and EAS CR

revised to S6-212639

Huawei, Hisilicon 23.558 17.1.0 CR#61 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

postponed [WTS] [JSN]
S6-212316 Discussion Paper on Gap Analysis between ETSI MEC and EDGEAPP discussion Huawei, Hisilicon FS_eEDGEAPP Rel-17 S6-45-bis-e

AI: 10.8

noted [WTS] [JSN]
S6-212317 Annex on the gap analysis between ETSI MEC and EDGEAPP pCR

revised to S6-212416

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212318 update to KI#5 pCR Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

merged [WTS] [JSN]
S6-212319 Solution for KI#6 - ECS discovery through serving ECS to support edge services across ECSPs pCR

revised to S6-212417

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212320 Solution for KI#6 - ECS enhancement to discover EESs via other ECSs to support edge services across ECSPs pCR

revised to S6-212418

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212321 Key issue on enhancement to application context transmission pCR

revised to S6-212419

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212322 Solution on enhancement to service continuity planning pCR

revised to S6-212420

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212323 Solution on supporting for roaming Ues pCR Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

withdrawn [WTS] [JSN]
S6-212324 New WID on Mission Critical Services over 5GProSe WID new

revised to S6-212421

Huawei, Hisilicon S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212325 New SID for Study on application enabler aspects to support Smart Grid Applications SID new

revised to S6-212422

Huawei, Hisilicon S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212326 Procedure for pre-established MBS session configuration and service announcement CR

revised to S6-212423

Huawei, Hisilicon 23.289 17.0.0 CR#3 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212327 MBS session release and de-announcement CR

revised to S6-212424

Huawei, Hisilicon 23.289 17.0.0 CR#4 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212328 Server triggered UE leave multicast MBS session CR

revised to S6-212425

Huawei, Hisilicon 23.289 17.0.0 CR#5 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212329 Selection of multicast and broadcast service for a group communication CR Huawei, Hisilicon 23.289 17.0.0 CR#6 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

postponed [WTS] [JSN]
S6-212330 MC service data distribution over 5G MBS CR

revised to S6-212426

Huawei, Hisilicon 23.289 17.0.0 CR#7 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212331 Call connect and disconnect over 5G MBS in MCPTT context CR

revised to S6-212427

Huawei, Hisilicon 23.289 17.0.0 CR#8 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212332 Call connect and disconnect over 5G MBS in MCVideo context CR

revised to S6-212428

Huawei, Hisilicon 23.289 17.0.0 CR#9 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212333 Service continuity between 5G MBS delivery and unicast delivery CR

revised to S6-212429

Huawei, Hisilicon 23.289 17.0.0 CR#10 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212334 Conclusion for MBS session release and de-announcement pCR

revised to S6-212430

Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212335 Conclusion for Server triggered UE leave multicast MBS session pCR

revised to S6-212431

Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212336 Conclusion for Multicast/broadcast selection pCR Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

merged [WTS] [JSN]
S6-212337 Conclusion for MC service data distribution over 5G MBS session pCR Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

merged [WTS] [JSN]
S6-212338 Conclusion for Call connect and disconnect over 5G MBS in MCPTT pCR Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

merged [WTS] [JSN]
S6-212339 Conclusion for Call connect and disconnect over 5G MBS in MCVideo pCR Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

merged [WTS] [JSN]
S6-212340 Conclusion for Service continuity between 5G MBS delivery and unicast delivery pCR Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

merged [WTS] [JSN]
S6-212341 Overall evaluations for MBS solutions pCR Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

merged [WTS] [JSN]
S6-212342 Conclusions for ProSe solutions pCR

revised to S6-212472

Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212343 Proposed skeleton for TR on Study on SEAL data delivery enabler for vertical applications pCR Huawei, Hisilicon 23.700-34 0.0.0 FS_SEALDD Rel-18 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212344 Proposal for scope pCR Huawei, Hisilicon 23.700-34 0.0.0 FS_SEALDD Rel-18 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212345 Key issue on E2E redundant transmission pCR

revised to S6-212432

Huawei, Hisilicon 23.700-34 0.0.0 FS_SEALDD Rel-18 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212346 Key issue on SEAL enabled Transport layer enhancement for UE continuity pCR

revised to S6-212433

Huawei, Hisilicon 23.700-34 0.0.0 FS_SEALDD Rel-18 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212347 Proposal for SEALDD application architecture pCR

revised to S6-212434

Huawei, Hisilicon 23.700-34 0.0.0 FS_SEALDD Rel-18 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212348 Missing API on Realtime UAV status CR Huawei, Hisilicon 23.255 17.1.0 CR#18 catF UASAPP Rel-17 S6-45-bis-e

AI: 7.8

agreed [WTS] [JSN]
S6-212349 Proposed skeleton for TR on study on enhancements to application layer support for V2X services; Phase 2 pCR Huawei, Hisilicon 23.700-64 0.0.0 FS_eV2XAPP2 Rel-18 S6-45-bis-e

AI: 10.11

approved [WTS] [JSN]
S6-212350 Proposal for scope pCR

revised to S6-212435

Huawei, Hisilicon 23.700-64 0.0.0 FS_eV2XAPP2 Rel-18 S6-45-bis-e

AI: 10.11

revised [WTS] [JSN]
S6-212351 5GMARCH store and forward CR

revised to S6-212371

Convida Wireless LLC 23.554 17.0.1 CR#12 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212352 Device Triggering KI pCR Convida Wireless LLC 23.700-97 0.2.0 FS_ACE_IOT Rel-18 S6-45-bis-e

AI: 10.6

postponed [WTS] [JSN]
S6-212353 Configuration of Traffic Patterns KI pCR

revised to S6-212372

Convida Wireless 23.700-97 0.2.0 FS_ACE_IOT Rel-18 S6-45-bis-e

AI: 10.6

revised [WTS] [JSN]
S6-212354 NIDD configuraton KI pCR

revised to S6-212373

Convida Wireless LLC 23.700-97 0.2.0 FS_ACE_IOT Rel-18 S6-45-bis-e

AI: 10.6

revised [WTS] [JSN]
S6-212355 5GMARCH Store and forward CR Convida Wireless 23.554 17.0.1 CR#13 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

withdrawn [WTS] [JSN]
S6-212356 LS on the definition of EAS and EAS context LS in

source LS: S4-211231

LS To: SA6

LS reply in S6-212358, S6-212391

SA4 5GMS_EDGE Rel-17 S6-45-bis-e

AI: 4.1

replied to [WTS] [JSN]
S6-212357 Reply LS on work split for MBSF and MBSTF definition LS in

source LS: S4-211292

SA4 FS_5GMS_Multicast, 5MBS Rel-17 S6-45-bis-e

AI: 4.1

noted [WTS] [JSN]
S6-212358 Reply LS on the definition of EAS and EAS context LS out

LS is reply to S6-212356

LS To: SA4

revised to S6-212391

current meeting EDGEAPP S6-45-bis-e

AI: 4.2

revised [WTS] [JSN]
S6-212359 LS on Private call forwarding LS in

source LS: C1-214882

LS reply in S6-212360

CT1 eMONASTERY2 Rel-17 S6-45-bis-e

AI: 4.1

postponed [WTS] [JSN]
S6-212360 REPLY LS: LS on Private call forwarding LS out

LS is reply to S6-212359

LS To: CT1

SA6 eMONASTERY2 S6-45-bis-e

AI: 4.2

noted [WTS] [JSN]
S6-212361 Private call forwarding LS out

LS To: SA1

SA6 eMONASTERY2 Rel-17 S6-45-bis-e

AI: 4.2

noted [WTS] [JSN]
S6-212362 Discussion paper on Ad hoc group call discussion Samsung, FirstNet S6-45-bis-e

AI: 11

noted [WTS] [JSN]
S6-212363 Pseudo-CR on 5G MBS impacts on MC service functional models pCR

revision of S6-212194

revised to S6-212491

Union Inter. Chemins de Fer 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212364 Pseudo-CR solution for key issue 1 on optimizing the connectivity between MC systems pCR

revision of S6-212196

UIC (Union Inter. Chemins de Fer), Nokia, Nokia Shanghai Bell 23.700-90 1.0.0 FS_IRail Rel-18 S6-45-bis-e

AI: 10.3

approved [WTS] [JSN]
S6-212365 Remove ENs with no actions in clause 5 CR

revision of S6-212228

Huawei, Hisilicon 23.554 17.0.1 CR#11 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212366 Corrections in clause 7 CR

revision of S6-212229

Huawei, Hisilicon 23.554 17.0.1 CR#21 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212367 New solution: EAS Service API enablement using CAPIF pCR

revision of S6-212285

revised to S6-212483

ETRI, Uangel 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212368 Pseudo-CR on Solution to Key issue #4: Information provided by the AC for service provisioning, EEC registration and EAS discovery pCR

revision of S6-212266

Apple GmbH 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

postponed [WTS] [JSN]
S6-212369 Addition of Requested ECSPs to the service provisioning request CR

revision of S6-212252

Apple GmbH 23.558 17.1.0 CR#551 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

postponed [WTS] [JSN]
S6-212370 UEs hosting multiple EECs KI pCR

revision of S6-212307

Convida Wireless LLC 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

postponed [WTS] [JSN]
S6-212371 5GMARCH store and forward CR

revision of S6-212351

revised to S6-212467

Convida Wireless LLC 23.554 17.0.1 CR#121 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212372 Configuration of Communication Patterns KI pCR

revision of S6-212353

Convida Wireless 23.700-97 0.2.0 FS_ACE_IOT Rel-18 S6-45-bis-e

AI: 10.6

approved [WTS] [JSN]
S6-212373 NIDD configuraton KI pCR

revision of S6-212354

Convida Wireless LLC 23.700-97 0.2.0 FS_ACE_IOT Rel-18 S6-45-bis-e

AI: 10.6

approved [WTS] [JSN]
S6-212374 New solution for enhacments to service continuity planning pCR

revision of S6-212291

KPN N.V. 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

postponed [WTS] [JSN]
S6-212375 Pseudo-CR on update solution 25 related to MBS session update aspects pCR

revision of S6-212262

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212376 Pseudo-CR on Inter-system mobility between LTE and 5G pCR

revision of S6-212264

revised to S6-212492

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212377 New SID on Service Function Chaining support for Edge Data Networks SID new

revision of S6-212224

Intel Technology India Pvt Ltd Rel-18 S6-45-bis-e

AI: 11

noted [WTS] [JSN]
S6-212378 Pseudo-CR on overall evaluation pCR

revision of S6-212269

revised to S6-212470

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212379 Pseudo-CR on Conclusions pCR

revision of S6-212270

revised to S6-212471

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212380 FS_eEDGEAPP: EAS Dual Application Registration pCR

revision of S6-212248

revised to S6-212520

Intel, Nokia 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

postponed [WTS] [JSN]
S6-212381 Pseudo-CR on update solution 24 related to 5G MBS session release aspects pCR

revision of S6-212271

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212382 LS on Concerns of scalability issues when serving mission critical users over multicast MBS sessions LS out

LS To: SA2, RAN3

revision of S6-212280

Ericsson Rel-17 S6-45-bis-e

AI: 4.2

postponed [WTS] [JSN]
S6-212383 Addition of definitions and introduction related to MC Gateway UE CR

revision of S6-212255

Samsung, Nokia, Nokia Shanghai Bell 23.280 17.8.0 CR#2981 catB MCGWUE Rel-18 S6-45-bis-e

AI: 9.3

agreed [WTS] [JSN]
S6-212384 Introduction of sub clauses to capture MC gateway UE function details CR

revision of S6-212256

revised to S6-212495

Samsung, Nokia, Nokia Shanghai Bell, BDBOS 23.280 17.8.0 CR#2991 catB MCGWUE Rel-18 S6-45-bis-e

AI: 9.3

revised [WTS] [JSN]
S6-212385 MCGWUE_MBMS support for MC clients residing on non-3GPP devices CR

revision of S6-212305

Samsung 23.280 17.8.0 CR#3011 catB MCGWUE Rel-18 S6-45-bis-e

AI: 9.3

agreed [WTS] [JSN]
S6-212386 Pseudo-CR on Private call using functional alias towards a partner MC system pCR

revision of S6-212258

revised to S6-212473

AT&T GNS Belgium SPRL 23.700-90 1.0.0 FS_IRail Rel-18 S6-45-bis-e

AI: 10.3

revised [WTS] [JSN]
S6-212387 Missing information table for the notification message CR

revision of S6-212260

AT&T GNS Belgium SPRL 23.282 17.8.0 CR#2881 catF eMCData3 Rel-17 S6-45-bis-e

AI: 7.4

agreed [WTS] [JSN]
S6-212388 TS-FFAPP-Skeleton pCR

revision of S6-212231

ZTE Corporation 23.545 0.0.0 FFAPP Rel-18 S6-45-bis-e

AI: 9.1

approved [WTS] [JSN]
S6-212389 FFAPP Introduction pCR

revision of S6-212232

ZTE Corporation 23.545 0.0.0 FFAPP Rel-18 S6-45-bis-e

AI: 9.1

approved [WTS] [JSN]
S6-212390 FFAPP Architectural requirements pCR

revision of S6-212235

revised to S6-212468

ZTE Corporation 23.545 0.0.0 FFAPP Rel-18 S6-45-bis-e

AI: 9.1

revised [WTS] [JSN]
S6-212391 Reply LS on the definition of EAS and EAS context LS out

LS is reply to S6-212356

LS To: SA4

revision of S6-212358

current meeting EDGEAPP S6-45-bis-e

AI: 4.2

approved [WTS] [JSN]
S6-212392 Add examples of KQI translation pCR

revision of S6-212205

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

postponed [WTS] [JSN]
S6-212393 Add solutions of fault management pCR

revision of S6-212204

revised to S6-212474

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

revised [WTS] [JSN]
S6-212394 Add solutions of performance and analytics exposure pCR

revision of S6-212203

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

postponed [WTS] [JSN]
S6-212395 Pseudo-CR on functional architecture update in solution #1 pCR

revision of S6-212295

CATT 23.700-96 0.2.0 FS_5GFLS Rel-18 S6-45-bis-e

AI: 10.7

approved [WTS] [JSN]
S6-212396 New SID on Study on Application Data Analytics Enablement Service SID new

revision of S6-212273

revised to S6-212488

Lenovo, Motorola Mobility Rel-18 S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212397 Key Issue on support for VRU high risk zones pCR

revision of S6-212274

Lenovo, Motorola Mobility 23.700-64 0.0.0 FS_eV2XAPP2 Rel-18 S6-45-bis-e

AI: 10.11

approved [WTS] [JSN]
S6-212398 Key Issue on support for energy efficient V2P communications pCR

revision of S6-212275

Lenovo, Motorola Mobility 23.700-64 0.0.0 FS_eV2XAPP2 Rel-18 S6-45-bis-e

AI: 10.11

approved [WTS] [JSN]
S6-212399 Key Issue on slice continuity support pCR

revision of S6-212276

revised to S6-212666

Lenovo, Motorola Mobility 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

postponed [WTS] [JSN]
S6-212400 Solution to KI #8 on API translation pCR

revision of S6-212277

Lenovo, Motorola Mobility 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

approved [WTS] [JSN]
S6-212401 Solution to KI #3 on service continuity planning enhancements pCR

revision of S6-212279

Lenovo, Motorola Mobility, Huawei 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212402 Pseudo-CR on new KI on EEL service differentiation framework pCR

revision of S6-212208

China Mobile Com. Corporation 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212403 EEC triggering for service provisioning pCR

revision of S6-212226

Samsung 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212404 Pseudo-CR on Application layer support aspect requirements pCR

revision of S6-212209

China Mobile Com. Corporation 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

approved [WTS] [JSN]
S6-212405 new KI on configuration information provision pCR

revision of S6-212211

China Mobile Com. Corporation 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

postponed [WTS] [JSN]
S6-212406 Pseudo-CR on new KI on enhanced network slice adaptation pCR

revision of S6-212212

China Mobile Com. Corporation 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

postponed [WTS] [JSN]
S6-212407 Pseudo-CR on service based representation of application architecture pCR

revision of S6-212213

China Mobile Com. Corporation 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

approved [WTS] [JSN]
S6-212408 Corrections to network slice adaptation CR

revision of S6-212214

China Mobile Com. Corporation 23.434 17.3.0 CR#821 catF eSEAL Rel-17 S6-45-bis-e

AI: 7.9

agreed [WTS] [JSN]
S6-212409 LS on network slice management service consumption LS out

LS To: 3GPP TSG SA WG5

revision of S6-212215

revised to S6-212460

China Mobile Com. Corporation S6-45-bis-e

AI: 4.2

revised [WTS] [JSN]
S6-212410 List of subscriptions to the CN in EEC context CR

revision of S6-212249

revised to S6-212462

Samsung 23.558 17.1.0 CR#541 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212411 Evalutation on solution #1 pCR

revision of S6-212246

Samsung 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212412 Modify the entity description and add ACR procedure description and abbreviation. CR

revision of S6-212239

revised to S6-212461

Samsung 23.558 17.1.0 CR#531 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212413 Adding DNN/S-NSSAI information in EAS profile CR

revision of S6-212310

revised to S6-212637

Huawei, Hisilicon 23.558 17.1.0 CR#561 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

postponed [WTS] [JSN]
S6-212414 Correction on ACR failure alleviation mechanisms CR

revision of S6-212311

revised to S6-212463

Huawei, Hisilicon 23.558 17.1.0 CR#571 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212415 Correction on ACR information subscription request CR

revision of S6-212312

revised to S6-212464

Huawei, Hisilicon 23.558 17.1.0 CR#581 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

revised [WTS] [JSN]
S6-212416 Annex on the gap analysis between ETSI MEC and EDGEAPP pCR

revision of S6-212317

revised to S6-212478

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212417 Solution for KI#6 - ECS discovery through serving ECS to support edge services across ECSPs pCR

revision of S6-212319

revised to S6-212485

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212418 Solution for KI#6 - ECS enhancement to discover EESs via other ECSs to support edge services across ECSPs pCR

revision of S6-212320

revised to S6-212486

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212419 Key issue on enhancement to EEL support for application context transmission pCR

revision of S6-212321

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

postponed [WTS] [JSN]
S6-212420 Solution on enhancement to service continuity planning pCR

revision of S6-212322

revised to S6-212484

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212421 New WID on Mission Critical Services over 5GProSe WID new

revision of S6-212324

revised to S6-212494

Huawei, Hisilicon S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212422 New SID for Study on application enabler aspects to support Smart Grid Applications SID new

revision of S6-212325

revised to S6-212641

Huawei, Hisilicon S6-45-bis-e

AI: 11

postponed [WTS] [JSN]
S6-212423 Procedure for MBS session configuration and service announcement CR

revision of S6-212326

revised to S6-212643

Huawei, Hisilicon 23.289 17.0.0 CR#31 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

postponed [WTS] [JSN]
S6-212424 MBS session release CR

revision of S6-212327

revised to S6-212469

Huawei, Hisilicon 23.289 17.0.0 CR#41 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212425 Server triggered UE(s) leaves a group operation which is using MBS session CR

revision of S6-212328

Huawei, Hisilicon 23.289 17.0.0 CR#51 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

postponed [WTS] [JSN]
S6-212426 MC service media distribution over 5G MBS CR

revision of S6-212330

revised to S6-212642

Huawei, Hisilicon 23.289 17.0.0 CR#71 catB MCOver5MBS Rel-18 S6-45-bis-e

AI: 9.2

revised [WTS] [JSN]
S6-212427 Call connect and disconnect over 5G MBS in MCPTT context CR

revision of S6-212331

Huawei, Hisilicon 23.289 17.0.0 CR#81 catB MCOver5MBS Rel-18 S6-45-bis-e

AI: 9.2

agreed [WTS] [JSN]
S6-212428 Call connect and disconnect over 5G MBS in MCVideo context CR

revision of S6-212332

Huawei, Hisilicon 23.289 17.0.0 CR#91 catB MCOver5MBS Rel-18 S6-45-bis-e

AI: 9.2

agreed [WTS] [JSN]
S6-212429 Service continuity between 5G MBS delivery and unicast delivery CR

revision of S6-212333

Huawei, Hisilicon 23.289 17.0.0 CR#101 catB MCOver5MBS Rel-18 S6-45-bis-e

AI: 9.2

agreed [WTS] [JSN]
S6-212430 Update to solution#28 pCR

revision of S6-212334

Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212431 Conclusion for MCOver5MBS pCR

revision of S6-212335

Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

merged [WTS] [JSN]
S6-212432 Key issue on E2E redundant transmission pCR

revision of S6-212345

Huawei, Hisilicon 23.700-34 0.0.0 FS_SEALDD Rel-18 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212433 Key issue on SEAL enabled Transport layer enhancement for UE continuity pCR

revision of S6-212346

Huawei, Hisilicon 23.700-34 0.0.0 FS_SEALDD Rel-18 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212434 Proposal for SEALDD application architecture pCR

revision of S6-212347

revised to S6-212487

Huawei, Hisilicon 23.700-34 0.0.0 FS_SEALDD Rel-18 S6-45-bis-e

AI: 10.1

revised [WTS] [JSN]
S6-212435 Proposal for scope pCR

revision of S6-212350

Huawei, Hisilicon 23.700-64 0.0.0 FS_eV2XAPP2 Rel-18 S6-45-bis-e

AI: 10.11

approved [WTS] [JSN]
S6-212436 MBS architectural and functionalities CR

revision of S6-212245

CBN 23.289 17.0.0 CR#21 catB MCOver5MBS Rel-17 S6-45-bis-e

AI: 9.2

postponed [WTS] [JSN]
S6-212437 Discussion on Rel-18 Work Planning discussion

revision of S6-212223

SA6 Chair Rel-18 S6-45-bis-e

AI: 12

endorsed [WTS] [JSN]
S6-212438 Add definition of MSGin5G Server address CR

revision of S6-212283

revised to S6-212465

China Mobile Com. Corporation 23.554 17.0.1 CR#41 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

revised [WTS] [JSN]
S6-212439 Modify the entity description and add abbreviation. CR Samsung 23.558 17.1.0 CR#533 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

withdrawn [WTS] [JSN]
S6-212440 Correction on clause 5.3.2.2 target resolution CR

revision of S6-212284

China Mobile Com. Corporation 23.554 17.0.1 CR#51 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212441 Correction on message delivery procedure to Message Gateway CR

revision of S6-212287

China Mobile Com. Corporation 23.554 17.0.1 CR#61 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212442 Remove API Related EN CR

revision of S6-212289

China Mobile Com. Corporation 23.554 17.0.1 CR#81 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212443 Correction on clause 8.3.3 CR

revision of S6-212292

China Mobile Com. Corporation 23.554 17.0.1 CR#101 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212444 Correction on clause 8.7.5 CR

revision of S6-212293

China Mobile Com. Corporation 23.554 17.0.1 CR#111 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212445 New KI Energy efficient communication in EC pCR

revision of S6-212219

revised to S6-212479

Ericsson 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212446 New KI Application traffic coordination with 3GPP UP connectivity pCR

revision of S6-212220

revised to S6-212480

Ericsson 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212447 Reply LS on EAS and ECS identifiers LS out

LS To: SA3

revision of S6-212216

revised to S6-212490

Ericsson S6-45-bis-e

AI: 4.2

revised [WTS] [JSN]
S6-212448 5GMARCH_CR_SEAL Group Deletion procedure CR

revision of S6-212297

Samsung 23.434 17.3.0 CR#831 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212449 pCR-SNAPP-Solution to KI#4 pCR

revision of S6-212299

revised to S6-212630

Samsung 23.700-95 0.2.0 FS_SNAAPP Rel-18 S6-45-bis-e

AI: 10.5

postponed [WTS] [JSN]
S6-212450 ACE_IOT_Solution for KI#2 - Application server monitoring and control of traffic pCR

revision of S6-212300

revised to S6-212476

Samsung 23.700-97 0.2.0 FS_ACE_IOT Rel-18 S6-45-bis-e

AI: 10.6

revised [WTS] [JSN]
S6-212451 eEDGEAPP_New KI on enabler layer support for EAS sync pCR

revision of S6-212301

revised to S6-212481

Samsung 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212452 5GFLS_solution for KI#1 - Functional architecture for fused location service leveraging SEAL pCR

revision of S6-212302

revised to S6-212477

Samsung 23.700-96 0.2.0 FS_5GFLS Rel-18 S6-45-bis-e

AI: 10.7

revised [WTS] [JSN]
S6-212453 Revised SID on Enhanced architecture for enabling Edge Applications SID revised

revision of S6-212303

Samsung FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 11

agreed [WTS] [JSN]
S6-212454 eSEAL2 WID proposal WID new

revision of S6-212304

revised to S6-212489

Samsung Rel-18 S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212455 New WID on Enhanced Mission Critical Push-to-talk architecture phase 4 WID new

revision of S6-212306

revised to S6-212493

Motorola Solutions Germany Rel-18 S6-45-bis-e

AI: 11

revised [WTS] [JSN]
S6-212456 Deployment scenarios for roaming pCR

revision of S6-212241

NTT DOCOMO, , Deutsche Telekom 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212457 Obtaining user consent via CAPIF-8 pCR

revision of S6-212243

revised to S6-212475

NTT DOCOMO 23.700-95 0.2.0 FS_SNAAPP Rel-18 S6-45-bis-e

AI: 10.5

revised [WTS] [JSN]
S6-212458 Addition of key issue pertaining to NAT deployments pCR

revision of S6-212294

revised to S6-212482

Nokia, Nokia Shanghai Bell 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

revised [WTS] [JSN]
S6-212459 SA6#45-BIS-e Work Plan Review discussion SA6 chair S6-45-bis-e

AI: 11

noted [WTS] [JSN]
S6-212460 LS on network slice management service consumption LS out

LS To: SA5

revision of S6-212409

SA6 Rel-18 S6-45-bis-e

AI: 4.2

approved [WTS] [JSN]
S6-212461 Modifying the functional Entity description for EEC and ECS CR

revision of S6-212412

Samsung 23.558 17.1.0 CR#532 catD EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

agreed [WTS] [JSN]
S6-212462 List of subscriptions to the CN in EEC context CR

revision of S6-212410

Samsung 23.558 17.1.0 CR#542 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

agreed [WTS] [JSN]
S6-212463 Correction on ACR failure alleviation mechanisms CR

revision of S6-212414

Huawei, Hisilicon 23.558 17.1.0 CR#572 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

agreed [WTS] [JSN]
S6-212464 Correction on ACR information subscription request CR

revision of S6-212415

Huawei, Hisilicon 23.558 17.1.0 CR#582 catF EDGEAPP Rel-17 S6-45-bis-e

AI: 7.6

agreed [WTS] [JSN]
S6-212465 Add definition of MSGin5G Server address CR

revision of S6-212438

China Mobile Com. Corporation 23.554 17.0.1 CR#42 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212466 Editorial of MSGin5G CR

revision of S6-212288

China Mobile Com. Corporation 23.554 17.0.1 CR#71 catD 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212467 5GMARCH store and forward CR

revision of S6-212371

Convida Wireless LLC 23.554 17.0.1 CR#122 catF 5GMARCH Rel-17 S6-45-bis-e

AI: 8.1

agreed [WTS] [JSN]
S6-212468 FFAPP Architectural requirements pCR

revision of S6-212390

ZTE Corporation 23.545 0.0.0 FFAPP Rel-18 S6-45-bis-e

AI: 9.1

approved [WTS] [JSN]
S6-212469 MBS session release CR

revision of S6-212424

Huawei, Hisilicon 23.289 17.0.0 CR#42 catB MCOver5MBS Rel-18 S6-45-bis-e

AI: 9.2

agreed [WTS] [JSN]
S6-212470 Pseudo-CR on overall evaluation pCR

revision of S6-212378

Ericsson, Huawei 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212471 Pseudo-CR on Conclusions pCR

revision of S6-212379

Ericsson, CBN, Huawei 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212472 Conclusions for ProSe solutions pCR

revision of S6-212342

Huawei, Hisilicon 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212473 Pseudo-CR on Private call using functional alias towards a partner MC system pCR

revision of S6-212386

AT&T 23.700-90 1.0.0 FS_IRail Rel-18 S6-45-bis-e

AI: 10.3

approved [WTS] [JSN]
S6-212474 Add solutions of fault management pCR

revision of S6-212393

HUAWEI TECHNOLOGIES Co. Ltd. 23.700-99 0.2.0 FS_NSCALE Rel-18 S6-45-bis-e

AI: 10.4

approved [WTS] [JSN]
S6-212475 Obtaining user consent via CAPIF-8 pCR

revision of S6-212457

NTT DOCOMO, Deutsche Telekom 23.700-95 0.2.0 FS_SNAAPP Rel-18 S6-45-bis-e

AI: 10.5

approved [WTS] [JSN]
S6-212476 Pseudo-CR on solution for KI#2 - Application server monitoring and control of traffic pCR

revision of S6-212450

Samsung 23.700-97 0.2.0 FS_ACE_IOT Rel-18 S6-45-bis-e

AI: 10.6

approved [WTS] [JSN]
S6-212477 Pseudo-CR on solution for KI#1 - Functional architecture for fused location service leveraging SEAL pCR

revision of S6-212452

Samsung, Qualcomm 23.700-96 0.2.0 FS_5GFLS Rel-18 S6-45-bis-e

AI: 10.7

approved [WTS] [JSN]
S6-212478 pCR – Annex on the gap analysis between ETSI MEC and EDGEAPP pCR

revision of S6-212416

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212479 New KI Energy efficient communication in EC pCR

revision of S6-212445

Ericsson 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212480 New KI Application traffic coordination with 3GPP UP connectivity pCR

revision of S6-212446

Ericsson 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212481 Pseudo-CR on new key issue on Enabler layer support for EAS synchronization pCR

revision of S6-212451

Samsung 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212482 Addition of key issue pertaining to NAT deployments pCR

revision of S6-212458

Nokia, Nokia Shanghai Bell 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212483 New solution: EAS Service API enablement using CAPIF pCR

revision of S6-212367

ETRI, Uangel 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212484 Solution on enhancement to service continuity planning pCR

revision of S6-212420

Huawei, Hisilicon, KPN, Ericsson 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212485 Solution for KI#6 - ECS discovery through serving ECS to support edge services across ECSPs pCR

revision of S6-212417

Huawei, Hisilicon, Samsung 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212486 Solution for KI#6 - ECS enhancement to discover EESs via other ECSs to support edge services across ECSPs pCR

revision of S6-212418

Huawei, Hisilicon 23.700-98 0.2.0 FS_eEDGEAPP Rel-18 S6-45-bis-e

AI: 10.8

approved [WTS] [JSN]
S6-212487 Proposal for SEALDD application architecture pCR

revision of S6-212434

Huawei, Hisilicon 23.700-34 0.0.0 FS_SEALDD Rel-18 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212488 New SID on Study on Application Data Analytics Enablement Service SID new

revision of S6-212396

Lenovo, Motorola Mobility Rel-18 S6-45-bis-e

AI: 11

agreed [WTS] [JSN]
S6-212489 New WID on Enhanced Service Enabler Architecture Layer for Verticals Phase 2 WID new

revision of S6-212454

SA6 Rel-18 S6-45-bis-e

AI: 11

agreed [WTS] [JSN]
S6-212490 Reply LS on EAS and ECS identifiers LS out

LS is reply to SA3-213089 / S6-212187

LS To: SA3

revision of S6-212447

SA6 S6-45-bis-e

AI: 4.2

approved [WTS] [JSN]
S6-212491 Pseudo-CR on 5G MBS impacts on MC service functional models pCR

revision of S6-212363

Union Inter. Chemins de Fer 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212492 Pseudo-CR on Inter-system mobility between LTE and 5G pCR

revision of S6-212376

Ericsson 23.783 1.6.0 FS_MCOver5GS Rel-17 S6-45-bis-e

AI: 10.1

approved [WTS] [JSN]
S6-212493 New WID on Enhanced Mission Critical Push-to-talk architecture phase 4 WID new

revision of S6-212455

SA6 Rel-18 S6-45-bis-e

AI: 11

agreed [WTS] [JSN]
S6-212494 New WID on Mission Critical Services over 5GProSe WID new

revision of S6-212421

SA6 S6-45-bis-e

AI: 11

agreed [WTS] [JSN]
S6-212495 Introduction of sub clauses to capture MC gateway UE function details CR

revision of S6-212384

Samsung, Nokia, Nokia Shanghai Bell, BDBOS 23.280 17.8.0 CR#2992 catB MCGWUE Rel-18 S6-45-bis-e

AI: 9.3

agreed [WTS] [JSN]

316 documents (1.0530979633331 seconds)