Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-221000 Agenda agenda WG Chair S5-141-e

AI: 2

approved [WTS] [JSN]
S5-221001 Report from last SA5 meeting report MCC S5-141-e

AI: 4.1

approved [WTS] [JSN]
S5-221002 e-meeting process discussion

revised to S5-221490

WG Chair S5-141-e

AI: 5.1

revised [WTS] [JSN]
S5-221003 Post e-meeting email approval status other WG Chair S5-141-e

AI: 5.1

available [WTS] [JSN]
S5-221004 OAM&P action list other WG Vice Chair (Huawei) S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221005 agenda_with_Tdocs_sequence_proposal_OAM agenda WG Vice Chair (Huawei) S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221006 OAM Exec Report report WG Vice Chair (Huawei) S5-141-e

AI: 6.1

available [WTS] [JSN]
S5-221007 OAM Chair notes and conclusions report WG Chair S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221008 CH agenda and time plan agenda

revised to S5-221642

CH Chair (MATRIXX Software) S5-141-e

AI: 7.1

revised [WTS] [JSN]
S5-221009 Charging exec report report WG Vice Chair (MATRIXX Software) S5-141-e

AI: 7.1

noted [WTS] [JSN]
S5-221010 SA5 working procedures other WG Chair S5-141-e

AI: 5.1

noted [WTS] [JSN]
S5-221011 Process for management of draft TS-TRs other WG Chair S5-141-e

AI: 5.1

noted [WTS] [JSN]
S5-221012 SA5 meeting calendar other WG CHair S5-141-e

AI: 5.4

noted [WTS] [JSN]
S5-221013 Collection of useful endorsed document and external communication documents discussion WG Vice Chair (Huawei) S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221014 LS on 3GPP SA5 work on 5G network energy efficiency and energy saving LS out

LS To: GSMA, NGMN, ITU-T SG5, ETSI TC EE, ETSI ISG NFV

revised to S5-221680

Orange S5-141-e

AI: 5.3

revised [WTS] [JSN]
S5-221015 Reply LS to SA on energy efficiency as guiding principle for new solutions LS out

source LS: SP-211621

LS To: SA

revised to S5-221501

Orange S5-141-e

AI: 5.3

revised [WTS] [JSN]
S5-221016 Reply LS on Recommendation ITU-T M.3381 LS out

source LS: SG2-LS224

LS To: ITU-T SG2

revised to S5-221502

Intel, NEC, Orange S5-141-e

AI: 5.3

revised [WTS] [JSN]
S5-221017 Discussion on RACH NSA measurements discussion

revised to S5-221537

Nokia Solutions & Networks (I) ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

revised [WTS] [JSN]
S5-221018 DP Deprecating attributes and IOCs discussion Ericsson Hungary Ltd adNRM Rel-17 S5-141-e

AI: 6.3

noted [WTS] [JSN]
S5-221019 Deprecating attributes and IOC CR Ericsson Hungary Ltd 32.156 16.4.0 CR#38 catB TEI17 Rel-17 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221020 Rel-16 CR 32.240 Correction on charging architecture for management domain CR

revised to S5-221677

Nokia, MATRIXX Software 32.24 16.4.0 CR#435 catF 5GS_NSMCH Rel-16 S5-141-e

AI: 7.3

revised [WTS] [JSN]
S5-221021 Add lifecycle-status for attributes, data types and IOCs CR Ericsson Hungary Ltd 32.16 17.3.0 CR#26 catB TEI17 Rel-17 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221022 Discussion paper on Asynchronous interactions discussion Ericsson Hungary Ltd adNRM Rel-17 S5-141-e

AI: 6.4.4

noted [WTS] [JSN]
S5-221023 Asynchronous operation NRM additions CR

revised to S5-221549

Ericsson Hungary Ltd 28.622 17.0.0 CR#126 catC adNRM Rel-17 S5-141-e

AI: 6.4.4

revised [WTS] [JSN]
S5-221024 Asynchronous operation NRM additions - YANG Stage 3 CR

revised to S5-221550

Ericsson Hungary Ltd 28.623 17.0.0 CR#144 catC adNRM Rel-17 S5-141-e

AI: 6.4.4

revised [WTS] [JSN]
S5-221025 Specifying multivalue attributes CR

revised to S5-221522

Ericsson Hungary Ltd 32.156 16.4.0 CR#39 catF eNRM Rel-16 S5-141-e

AI: 6.3

revised [WTS] [JSN]
S5-221026 Alarm Record changes CR

revised to S5-221521

Ericsson Hungary Ltd 28.622 17.0.0 CR#127 catA eNRM Rel-17 S5-141-e

AI: 6.3

revised [WTS] [JSN]
S5-221027 Notification Subscription changes CR

revised to S5-221519

Ericsson Hungary Ltd 28.622 17.0.0 CR#128 catA eNRM Rel-17 S5-141-e

AI: 6.3

revised [WTS] [JSN]
S5-221028 Rel-17 CR 32.240 Correction on charging architecture for management domain CR

revised to S5-221678

Nokia, MATRIXX Software 32.24 17.4.0 CR#436 catA 5GS_NSMCH Rel-17 S5-141-e

AI: 7.3

revised [WTS] [JSN]
S5-221029 Fix stage3 definition for 5G_DDNMF CR CATT 28.541 17.5.0 CR#641 catF adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221030 Rel-17 CR 28.541 Update Figure L.2.1 and accompanying paragraph. CR TELEFONICA S.A. 28.541 17.5.0 CR#642 catF EMA5SLA Rel-17 S5-141-e

AI: 6.4.2

not pursued [WTS] [JSN]
S5-221031 YANG corrections CR Ericsson Hungary Ltd 28.541 17.5.0 CR#643 catF adNRM Rel-17 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221032 Rel-16 CR 28.623 Structuring of TraceJob IOC and Clean up CR Nokia, Nokia Shanghai Bell 28.623 16.10.0 CR#145 catF 5GMDT Rel-16 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221033 pCR 28.557 Correct typo in clause 4.6.2 pCR TELEFONICA S.A. 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

withdrawn [WTS] [JSN]
S5-221034 Fixing lists errors in AmfFunction-Single (stage 3) CR Nokia Germany 28.541 17.5.0 CR#644 catF adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221035 Rel-17 CR 28.541 Update RANSliceSubnetProfile attributes CR

revised to S5-221531

TELEFONICA S.A. 28.541 17.5.0 CR#645 catF EMA5SLA Rel-17 S5-141-e

AI: 6.4.2

revised [WTS] [JSN]
S5-221036 Enhance 5G Core managed NF Profile NRM fragment (Stage 2) CR Nokia Germany 28.541 17.5.0 CR#646 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-221037 pCR 28.557 Correct typo in clause 4.6.2 pCR TELEFONICA S.A. 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221038 pCR 28.557 Add new NPN management related requirements pCR

revised to S5-221526

TELEFONICA S.A. 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

revised [WTS] [JSN]
S5-221039 Next step for FS_YANG discussion Ericsson Hungary Ltd FS_YANG Rel-17 S5-141-e

AI: 6.5.1

endorsed [WTS] [JSN]
S5-221040 Data change notifications YANG-in-Rest format CR Ericsson Hungary Ltd 28.532 16.10.0 CR#194 catC TEI17 Rel-17 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221041 Adding Management Based Activation and Temporary stop and restart during RAN overload in NR CR Ericsson Limited 28.405 17.0.0 CR#5 catB eQoE Rel-17 S5-141-e

AI: 6.4.5

agreed [WTS] [JSN]
S5-221042 Adding Signalling Based Activation for NR CR

revised to S5-221557

Ericsson Limited 28.405 17.0.0 CR#6 catB eQoE Rel-17 S5-141-e

AI: 6.4.5

revised [WTS] [JSN]
S5-221043 Handling of QoE measurement collection at handover in NR CR Ericsson Limited 28.405 17.0.0 CR#7 catB eQoE Rel-17 S5-141-e

AI: 6.4.5

not pursued [WTS] [JSN]
S5-221044 Adding VR measurements CR Ericsson Limited 28.404 17.0.0 CR#6 catB eQoE Rel-17 S5-141-e

AI: 6.4.5

agreed [WTS] [JSN]
S5-221045 Enhance 5G Core managed NF Profile NRM fragment (Stage 3) CR Nokia Germany 28.541 17.5.0 CR#647 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-221046 Including individual PM, KPI, trace and QoE statistics and predictions as additional MDA types pCR

revised to S5-221602

Nokia Germany 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221047 pCR 28.314 PnC Concepts and Requirements - remove Editor note pCR Oy LM Ericsson AB 28.314 0.4.0 PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221048 Editorial on the definition of AssuranceClosedControlLoop CR

revised to S5-221586

Nokia Germany 28.536 17.1.0 CR#37 catD eCOSLA Rel-17 S5-141-e

AI: 6.4.

revised [WTS] [JSN]
S5-221049 pCR 28.314 PnC Concepts and Requirements - updates from ETSI review pCR Oy LM Ericsson AB 28.314 0.4.0 PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221050 pCR 28.315 PnC Procedure flows - remove Editor note pCR Oy LM Ericsson AB 28.315 0.3.0 PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221051 pCR 28.315 PnC Procedure flows - updates from ETSI review pCR Oy LM Ericsson AB 28.315 0.3.0 PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221052 pCR 28.316 PnC Data formats - DHCP Replies pCR Oy LM Ericsson AB 28.316 0.2.0 PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221053 pCR 28.316 PnC Data formats - FQDN pCR Oy LM Ericsson AB 28.316 0.2.0 PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221054 pCR 28.316 PnC Data formats - updates from ETSI review pCR Oy LM Ericsson AB 28.316 0.2.0 PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221055 Presentation of Spec TS28.314 Version 1.0.0 to TSG and WG TS or TR cover Oy LM Ericsson AB PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221056 Presentation of Spec TS28.315 Version 1.0.0 to TSG and WG TS or TR cover Oy LM Ericsson AB PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221057 Presentation of Spec TS28.316 Version 1.0.0 to TSG and WG TS or TR cover Oy LM Ericsson AB PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221058 Add Space Division Multiplexing PRB Usage for MIMO cell CR

revised to S5-221538

CMCC, Huawei, ZTE 28.552 17.5.0 CR#341 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

revised [WTS] [JSN]
S5-221059 Forge working procedure change in SA5 Working Procedures other

revised to S5-221497

Nokia, Nokia Shanghai Bell S5-141-e

AI: 5.1

revised [WTS] [JSN]
S5-221060 Rel-17 network slice isolation CR Nokia, Nokia Shanghai Bell 28.541 17.5.0 CR#648 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-221061 TS28.540 Update the requirements for management enhancement of network slice and network slice subnet CR Nokia, Nokia Shanghai Bell 28.54 17.2.0 CR#17 catB EMA5SLA Rel-17 S5-141-e

AI: 6.4.2

not pursued [WTS] [JSN]
S5-221062 DP for New Rel-18 SID measurement data collection to support RAN intelligence_x00B_ discussion Intel Corporation (UK) Ltd Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221063 New SID Study on measurement data collection to support RAN intelligence SID new Intel Corporation (UK) Ltd, Verizon, AT&T, CMCC Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221064 Notification Subscription changes CR

revised to S5-221518

Ericsson Hungary Ltd 28.622 16.10.0 CR#129 catF eNRM Rel-16 S5-141-e

AI: 6.3

revised [WTS] [JSN]
S5-221065 Alarm Record changes CR

revised to S5-221520

Ericsson Hungary Ltd 28.622 16.10.0 CR#130 catF eNRM Rel-16 S5-141-e

AI: 6.3

revised [WTS] [JSN]
S5-221066 pCR 28.538 add fault supervision use cases pCR Intel 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221067 pCR 28.538 add fault supervision procedures pCR

revised to S5-221624

Intel 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221068 pCR 28.538 add provisioning use cases pCR

revised to S5-221625

Intel 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221069 pCR 28.538 add provisioning procedures pCR

revised to S5-221626

Intel 28.538 0.4.0 IDMS_MN, ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221070 pCR 28.538 add relevent NRM changes to support ECM use cases pCR

revised to S5-221628

Intel 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221071 Rel-17 CR 28.532 add object class to FS subscription CR Intel 28.532 16.10.0 CR#195 catB ECM Rel-17 S5-141-e

AI: 6.4.18

not pursued [WTS] [JSN]
S5-221072 Rel-17 CR 28.541 Correct NRM fragment for DMRO Management CR Intel 28.541 17.5.0 CR#649 catF eSON_5G Rel-17 S5-141-e

AI: 6.4.11

agreed [WTS] [JSN]
S5-221073 Rel-17 CR 28.541 Add Stage 2 solutions to support ECM CR

revised to S5-221627

Intel 28.541 17.5.0 CR#650 catB ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221074 Rel-17 CR 28.313 Add information in the PCI configuration notification CR

revised to S5-221591

Intel 28.313 17.3.0 CR#45 catB eSON_5G Rel-17 S5-141-e

AI: 6.4.11

revised [WTS] [JSN]
S5-221075 Rel-17 CR 28.313 Add information in the C-SON notification CR

revised to S5-221592

Intel 28.313 17.3.0 CR#46 catB eSON_5G Rel-17 S5-141-e

AI: 6.4.11

revised [WTS] [JSN]
S5-221076 CR Rel-17 28.622 Enhance NRM with geographical information supporting MDA CR

revised to S5-221604

Intel 28.622 17.0.0 CR#131 catB eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221077 CR Rel-17 28.623 Enhance NRM with geographical information supporting MDA CR

revised to S5-221605

Intel 28.623 17.0.0 CR#146 catB eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221078 pCR TS 28.312 Add feasibility check to the procedures for intent management pCR

revised to S5-221584

China Mobile Com. Corporation 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

revised [WTS] [JSN]
S5-221079 Reply LS on slicing management aspects in relation to SEAL LS out

LS is reply to S6-210709

LS To: SA6

revised to S5-221548

Huawei Rel-17 S5-141-e

AI: 5.3

revised [WTS] [JSN]
S5-221080 Rel-17 CR 28.541 Update energy efficiency attribute CR

revised to S5-221532

Huawei 28.541 17.5.0 CR#651 catF EMA5SLA Rel-17 S5-141-e

AI: 6.4.2

revised [WTS] [JSN]
S5-221081 pCR 28.557 fixing leftover of updating names for management modes of NPN pCR Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221082 pCR 28.557 Solution for management of SNPN pCR

revised to S5-221527

Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

revised [WTS] [JSN]
S5-221083 pCR 28.557 Update solution for NPN provisioning by a network slice of a PLMN pCR

revised to S5-221528

Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

revised [WTS] [JSN]
S5-221084 pCR 28.557 Solution for exposure of management capability of PNI-NPN pCR Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221085 pCR 28.557 Solution for collecting UE related data pCR

revised to S5-221529

Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

revised [WTS] [JSN]
S5-221086 pCR 28.557 Use case of collecting UE related data pCR

revised to S5-221530

Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

revised [WTS] [JSN]
S5-221087 pCR 28.557 Rapporteur proposal pCR Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221088 Presentation sheet of TS 28.557 for Approval TS or TR cover Huawei OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221089 pCR 28.824 Skeleton restructuring proposal pCR

revised to S5-221713

Huawei, Alibaba 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221090 pCR 28.824 Possible solution for exposure of network slice as a service pCR Huawei 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221091 Rel-17 CR 28.533 Update on management capability exposure governance CR Huawei 28.533 17.1.0 CR#96 catC TEI17 Rel-17 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221092 Rel-17 CR 28.533 Add EGMF services to support MnS exposure CR Huawei 28.533 17.1.0 CR#97 catC NETSLICE Rel-17 S5-141-e

AI: 6.3

withdrawn [WTS] [JSN]
S5-221093 Presentation of TR 28.822 for Approval TS or TR cover Huawei FS_5GLAN_CH Rel-17 S5-141-e

AI: 7.5.1

approved [WTS] [JSN]
S5-221094 LSout on Enhancement on Charging Identifier Uniqueness Mechanism LS out

LS To: CT4

revised to S5-221657

Huawei FS_5GLAN_CH Rel-17 S5-141-e

AI: 7.3

revised [WTS] [JSN]
S5-221095 Rel-17 pCR 28.822 Remove the editor‘s note for topic 4 pCR Huawei 28.822 1.0.0 FS_5GLAN_CH Rel-17 S5-141-e

AI: 7.5.1

approved [WTS] [JSN]
S5-221096 Rel-17 pCR 28.822 Correction on the solution and conclusion for Topic 4 pCR

revised to S5-221727

Huawei 28.822 1.0.0 FS_5GLAN_CH Rel-17 S5-141-e

AI: 7.5.1

revised [WTS] [JSN]
S5-221097 Rel-17 pCR 28.822 Correction on the Recommendation pCR Huawei 28.822 1.0.0 FS_5GLAN_CH Rel-17 S5-141-e

AI: 7.5.1

approved [WTS] [JSN]
S5-221098 Rel-17 CR 32.240 Addition of the 5G LAN-type service Description CR

revised to S5-221689

Huawei 32.24 17.4.0 CR#437 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

revised [WTS] [JSN]
S5-221099 Rel-17 CR 32.240 Addition of the 5G VN group management Charging CR Huawei 32.24 17.4.0 CR#438 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

not pursued [WTS] [JSN]
S5-221100 Rel-17 CR 32.255 Clarification on the 5G LAN type service charging CR

revised to S5-221724

Huawei 32.255 17.4.0 CR#354 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

revised [WTS] [JSN]
S5-221101 Rel-17 CR 32.255 Additional charging information for the 5G LAN charging CR

revised to S5-221728

Huawei 32.255 17.4.0 CR#355 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

revised [WTS] [JSN]
S5-221102 Rel-17 CR 32.291 Additional charging information for the 5G LAN communication CR

revised to S5-221725

Huawei 32.291 17.1.0 CR#360 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

revised [WTS] [JSN]
S5-221103 Rel-17 CR 32.298 Additional charging information for the 5G LAN communication CR Huawei 32.298 17.1.0 CR#882 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

not pursued [WTS] [JSN]
S5-221104 Rel-16 CR 32.255 Correction on the UPF Id used for QBC CR Huawei 32.255 16.11.0 CR#356 catF TEI16, 5GS_Ph1-DCH Rel-16 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221105 Rel-17 CR 32.255 Correction on the UPF Id used for QBC CR Huawei 32.255 17.4.0 CR#357 catA TEI16, 5GS_Ph1-DCH Rel-17 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221106 Rel-16 CR 32.291 Correction on the UPF Id used for QBC CR Huawei 32.291 16.10.0 CR#361 catF TEI16, 5GS_Ph1-DCH Rel-16 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221107 Rel-17 CR 32.291 Correction on the UPF Id used for QBC CR Huawei 32.291 17.1.0 CR#362 catA TEI16, 5GS_Ph1-DCH Rel-17 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221108 Rel-16 CR 32.298 Correction on the UPF Id used for QBC CR Huawei 32.298 16.10.0 CR#883 catF TEI16, 5GS_Ph1-DCH Rel-16 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221109 Rel-17 CR 32.298 Correction on the UPF Id used for QBC CR Huawei 32.298 17.1.0 CR#884 catA TEI16, 5GS_Ph1-DCH Rel-17 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221110 Rel-16 CR 32.255 Correction on the Charging Identifier Uniqueness CR Huawei 32.255 16.11.0 CR#358 catF 5GIEPC_CH Rel-16 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221111 Rel-17 CR 32.255 Correction on the Charging Identifier Uniqueness CR Huawei 32.255 17.4.0 CR#359 catA 5GIEPC_CH Rel-17 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221112 Rel-16 CR 32.291 Correction on the Charging Identifier Uniqueness CR Huawei 32.291 16.10.0 CR#363 catF 5GIEPC_CH Rel-16 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221113 Rel-17 CR 32.291 Correction on the Charging Identifier Uniqueness CR Huawei 32.291 17.1.0 CR#364 catA 5GIEPC_CH Rel-17 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221114 Rel-16 CR 32.298 Correction on the Charging Identifier Uniqueness CR Huawei 32.298 16.10.0 CR#885 catF 5GIEPC_CH Rel-16 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221115 Rel-17 CR 32.298 Correction on the Charging Identifier Uniqueness CR Huawei 32.298 17.1.0 CR#886 catA 5GIEPC_CH Rel-17 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221116 Rel-17 CR 32.255 Additional Supported fields for the QoS Mornitoring Report CR Huawei 32.255 17.4.0 CR#360 catF 5GIEPC_CH Rel-17 S5-141-e

AI: 7.3

merged [WTS] [JSN]
S5-221117 Rel-17 CR 32.291 Addition of the Supported Feature for URLLC CR Huawei 32.291 17.1.0 CR#365 catF 5G_URLLC Rel-17 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221118 Rel-16 CR 32.291 Extensibility Mechanisms for charging CR

revised to S5-221730

Huawei 32.291 16.10.0 CR#366 catF TEI16 Rel-16 S5-141-e

AI: 7.3

revised [WTS] [JSN]
S5-221119 Rel-17 CR 32.291 Extensibility Mechanisms for charging CR

revised to S5-221731

Huawei 32.291 17.1.0 CR#367 catA TEI16 Rel-17 S5-141-e

AI: 7.3

revised [WTS] [JSN]
S5-221120 Rel-17 pCR 28.826 Update the References pCR Huawei 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

approved [WTS] [JSN]
S5-221121 Rel-17 pCR 28.826 Add the solution for Non-blocking Mode Enhancement pCR Huawei 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

noted [WTS] [JSN]
S5-221122 Rel-17 pCR 28.827 Editorial Correction on the Figures pCR Huawei 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221123 Rel-17 pCR 28.827 Addition of the soultion for the Roaming Charging Profile pCR

revised to S5-221729

Huawei 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

revised [WTS] [JSN]
S5-221124 Rel-17 pCR 28.827 Clarification on the Roaming Charging Profile pCR

revised to S5-221732

Huawei 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

revised [WTS] [JSN]
S5-221125 Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in charging procedure CR

revised to S5-221664

Huawei 32.255 17.4.0 CR#361 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

revised [WTS] [JSN]
S5-221126 Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in EPC interworking procedure CR

revised to S5-221665

Huawei 32.255 17.4.0 CR#362 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

revised [WTS] [JSN]
S5-221127 Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in home-routed roaming procedure CR

revised to S5-221666

Huawei 32.255 17.4.0 CR#363 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

revised [WTS] [JSN]
S5-221128 Rel-17 CR 32.255 Add charging information of 5GS CIoT CR

revised to S5-221667

Huawei 32.255 17.4.0 CR#364 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

revised [WTS] [JSN]
S5-221129 Rel-17 CR 32.255 Add charging requirements of 5GS CIoT CR

revised to S5-221668

Huawei 32.255 17.4.0 CR#365 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

revised [WTS] [JSN]
S5-221130 Rel-17 CR TS 32.291 Add charging information of 5GS CIoT CR

revised to S5-221669

Huawei 32.291 17.1.0 CR#368 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

revised [WTS] [JSN]
S5-221131 pCR TS 28.312 Rapporteur clean up pCR

revised to S5-221585

Huawei 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

revised [WTS] [JSN]
S5-221132 pCR TS 28.312 Align the description for general concept of intent content pCR

revised to S5-221580

Huawei,Nokia, Deutsche Telekom,AsiaInfo 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

revised [WTS] [JSN]
S5-221133 pCR TS 28.312 Update intent information model pCR

revised to S5-221581

Huawei, China Mobile, China Unicom, Nokia, Deutsche Telekom,AsiaInfo 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

revised [WTS] [JSN]
S5-221134 pCR TS 28.312 Update RadioNetworkExpectation pCR

revised to S5-221575

Huawei, China Mobile, China Unicom,, Deutsche Telekom 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

revised [WTS] [JSN]
S5-221135 pCR TS 28.312 Clean up on procedures pCR

revised to S5-221582

Huawei, Deutsche Telekom 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

revised [WTS] [JSN]
S5-221136 Rel-17 CR TS 28.541 Alignment on NR NRM for MOCN network sharing CR

revised to S5-221599

Huawei,Orange,China Mobile,China Unicom,China Telecom, Deutsche Telekom,Ericsson,Telefonica 28.541 17.5.0 CR#652 catF MANS Rel-17 S5-141-e

AI: 6.4.14

revised [WTS] [JSN]
S5-221137 Rel-17 CR TS 32.130 Clean up on concept and business level requirements CR Huawei, China Unicom,China Telecom 32.13 17.3.0 CR#17 catF MANS Rel-17 S5-141-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-221138 Rel-17 CR TS 32.130 Add missing use case and requirements for radio resources partitioning between POPs CR Huawei, China Unicom,China Telecom 32.13 17.3.0 CR#18 catB MANS Rel-17 S5-141-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-221139 Rel-17 CR TS 32.130 Add solution description for the requirements for the management of the shared NG-RAN NE(s) in MOCN network sharing scenario CR

revised to S5-221600

Huawei,Orange,China Mobile, China Unicom,China Telecom, Deutsche Telekom,Ericsson,Telefonica 32.13 17.3.0 CR#19 catB MANS Rel-17 S5-141-e

AI: 6.4.14

revised [WTS] [JSN]
S5-221140 pCR TS28.104 Add E2E latency analysis solution pCR

revised to S5-221609

Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221141 pCR TS 28.104 add E2E latency analysis solution - stage3 pCR Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221142 pCR TS28.104 Add service experience analysis solution pCR

revised to S5-221712

Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221143 pCR TS 28.104 add service experience analysis solution -stage3 pCR Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221144 pCR TS28.104 Add network slice throughput analysis solution pCR

revised to S5-221610

Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221145 pCR TS 28.104 add network slice throughput analysis solution - stage3 pCR Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221146 pCR TS28.104 Add network slice load analysis solution pCR

revised to S5-221611

Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221147 pCR TS 28.104 add network slice load analysis solution - stage3 pCR Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221148 Rel-17 CR TS 32.422 Correct the value of Report Interval in NR for alignment CR

revised to S5-221523

China Telecom Corporation Ltd. 32.422 17.5.0 CR#384 catA TEI16 Rel-17 S5-141-e

AI: 6.3

revised [WTS] [JSN]
S5-221149 Revised WID for additional NRM features WID revised Nokia, Nokia Shanghai Bell adNRM Rel-17 S5-141-e

AI: 6.4.4

noted [WTS] [JSN]
S5-221150 Rel-17 CR TS 28.541 Add feasibility check NRM fragment CR

revision of S5-216205

Huawei,China Unicom, Deutsche Telekom,China Mobile 28.541 17.5.0 CR#5363 catB eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221151 Rel-17 CR TS 28.531 Update procedure of reservation and checking feasibility of network slice subnet CR

revision of S5-216206

Huawei,China Unicom,Deutsche Telekom,China Mobile 28.531 17.2.0 CR#703 catB eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221152 Rel-17 CR TS 28.531 Update procedure of network slice subnet instance allocation CR Huawei 28.531 17.2.0 CR#99 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

agreed [WTS] [JSN]
S5-221153 pCR TS 28.312 add stage3 for intent NRM pCR Huawei 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221154 Presentation sheet of TS 28.312 for SA Information and Approval other

revised to S5-221583

Huawei IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

revised [WTS] [JSN]
S5-221155 Rel-15 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA CR

revision of S5-216580

Huawei 28.658 15.6.0 CR#582 catF NETSLICE-5GNRM Rel-15 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221156 Rel-16 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA CR

revision of S5-216581

Huawei 28.658 16.4.0 CR#592 catA NETSLICE-5GNRM Rel-16 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221157 Rel-17 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA CR Huawei 28.658 17.0.0 CR#60 catA NETSLICE-5GNRM Rel-17 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221158 Rel-15 CR TS 28.662 Update Generic RAN NRM to be applicable for SBMA CR

revision of S5-216618

Huawei 28.662 15.3.0 CR#122 catF NETSLICE-5GNRM Rel-15 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221159 Rel-16 CR TS 28.662 Update Generic RAN NRM to be applicable for SBMA CR

revision of S5-216619

Huawei 28.662 16.0.0 CR#132 catA NETSLICE-5GNRM Rel-16 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221160 Rel-17 CR TS 28.622 Add condition information for threshold monitoring CR

revision of S5-216343

Huawei 28.622 17.0.0 CR#1192 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-221161 Rel-17 CR TS 28.541 Add tenant IOC to support multiple tenant environment CR

revision of S5-216228

revised to S5-221558

Huawei 28.541 17.5.0 CR#5383 catB eMEMTANE Rel-17 S5-141-e

AI: 6.4.7

revised [WTS] [JSN]
S5-221162 Rel-17 CR TS 28.659 Provide YAML solution set for EUTRAN NRM CR

revision of S5-216164

Huawei 28.659 16.2.0 CR#392 catB NSA_SBMA Rel-17 S5-141-e

AI: 6.4.19

not pursued [WTS] [JSN]
S5-221163 Rel-17 CR TS 28.663 Provide YAML solution set for RAN NRM CR

revision of S5-216165

Huawei 28.663 16.0.0 CR#212 catB NSA_SBMA Rel-17 S5-141-e

AI: 6.4.19

not pursued [WTS] [JSN]
S5-221164 CR TS 28.622 Add description of the corresponding IOCs CR Huawei Technologies (Korea) 28.622 17.0.0 CR#132 catF NSA_SBMA Rel-17 S5-141-e

AI: 6.4.19

not pursued [WTS] [JSN]
S5-221165 CR Rel-17 TS 28.533 Add 5G specification information CR

revised to S5-221503

Huawei Technologies (Korea) 28.533 17.1.0 CR#98 catF TEI17 Rel-17 S5-141-e

AI: 6.1

revised [WTS] [JSN]
S5-221166 Add MDT reporting for NR CR Ericsson LM 32.422 16.8.0 CR#385 catB e_5GMDT Rel-16 S5-141-e

AI: 6.4.3

not pursued [WTS] [JSN]
S5-221167 CR Rel-16 TS 32.103 Remove 5G specification information CR

revised to S5-221504

Huawei Technologies (Korea) 32.103 16.2.0 CR#33 catF TEI16 Rel-16 S5-141-e

AI: 6.1

revised [WTS] [JSN]
S5-221168 Add MDT reporting for NR CR

revised to S5-221534

Ericsson LM 32.422 17.5.0 CR#386 catB e_5GMDT Rel-17 S5-141-e

AI: 6.4.3

revised [WTS] [JSN]
S5-221169 Rel-17 CR TS 32.130 Add administrative management capability requirements CR ZTE Corporation, China Unicom 32.13 17.3.0 CR#20 catB MANS Rel-17 S5-141-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-221170 Add MDT signalling activation and deactivation mechanisms in a split architecture for NR CR

revised to S5-221535

Ericsson LM 32.422 17.5.0 CR#387 catB e_5GMDT Rel-17 S5-141-e

AI: 6.4.3

revised [WTS] [JSN]
S5-221171 Rel-17 CR TS 28.541 Add administrativeState attribute in OperatorNRCellDU CR

revised to S5-221601

ZTE Corporation, China Unicom 28.541 17.5.0 CR#653 catB MANS Rel-17 S5-141-e

AI: 6.4.14

revised [WTS] [JSN]
S5-221172 Add MDT management activation and deactivation mechanism in the case of split architecture for NR CR

revised to S5-221536

Ericsson LM 32.422 17.5.0 CR#388 catB e_5GMDT Rel-17 S5-141-e

AI: 6.4.3

revised [WTS] [JSN]
S5-221173 Rel-18 time plan proposal for OAM discussion SA5 Vice chair (Huawei),SA5 Chair S5-141-e

AI: 6.1

endorsed [WTS] [JSN]
S5-221174 Rel-16 CR TS 28.541 Remove incorrect reference to 22.104 CR ZTE Corporation 28.541 16.11.0 CR#654 catF eNRM Rel-16 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221175 Rel-17 CR TS 28.541 Remove incorrect reference to 22.104 CR ZTE Corporation 28.541 17.5.0 CR#655 catA eNRM Rel-17 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221176 Rel-16 CR TS 28.541 Change the datatype of RRMPolicyRatio to real CR ZTE Corporation, China Mobile, China Telecom 28.541 16.11.0 CR#656 catF eNRM Rel-16 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221177 Rel-17 CR TS 28.552 Remove the number of failed conditional handover executions which is not implementable CR China Telecom Corporation Ltd., ZTE 28.552 17.5.0 CR#342 catF ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221178 Rel-17 CR TS 28.541 Change the datatype of RRMPolicyRatio to real CR ZTE Corporation, China Mobile, China Telecom 28.541 17.5.0 CR#657 catA eNRM Rel-17 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221179 New SID on Network Slice Management Capability Exposure Phase 2 SID new Alibaba Group Rel-18 S5-141-e

AI: 6.2

withdrawn [WTS] [JSN]
S5-221180 NRM enhacements for SMFFunction CR

revised to S5-221555

Nokia Germany 28.541 17.5.0 CR#658 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

revised [WTS] [JSN]
S5-221181 New Rel-18 SID on Closed control loop for autonomous network management SID new ZTE Corporation S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221182 pCR TS 28.104 add Energy saving analytics output solution --stage2 pCR Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

merged [WTS] [JSN]
S5-221183 pCR TS 28.104 add coverage issue analytics output area definition--stage2 pCR

revised to S5-221606

Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221184 pCR TS 28.104 add output stage3 for Energy saving analytics and coverage issue analytics pCR Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221185 pCR TS 28.104 add AnalticsOutputFilters of coverage issue analysis stage2 pCR Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221186 pCR TS 28.104 add reporting method pCR Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221187 pCR TS 28.104 add report control NRM stage3 pCR Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221188 pCR TS 28.104 add MDA analysis request and report generic workflow pCR Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221189 pCR TS 28.104 add MDA related service components pCR

revised to S5-221621

Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221190 pCR TS28.104 Add the requirements for ML model training for MDA pCR

revised to S5-221614

Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221191 Rel-17 CR 28.541 Add C-SON CCO NRM model stage2 CR

revised to S5-221594

Huawei 28.541 17.5.0 CR#659 catB eSON_5G Rel-17 S5-141-e

AI: 6.4.11

revised [WTS] [JSN]
S5-221192 Rel-17 CR 28.541 Add C-SON CCO NRM model stage3 CR

revised to S5-221593

Huawei 28.541 17.5.0 CR#660 catB eSON_5G Rel-17 S5-141-e

AI: 6.4.11

revised [WTS] [JSN]
S5-221193 Rel-17 CR TS 28.552 Add one more trigger point to the Number of failed DAPS handover preparations performance measurement CR China Telecom Corporation Ltd., ZTE 28.552 17.5.0 CR#343 catF ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221194 Preparation of checking the Rel-17 OAM work progress discussion

revised to S5-221505

SA5 Vice chair (Huawei) S5-141-e

AI: 6.1

revised [WTS] [JSN]
S5-221195 New WID on Network Slice Management Capability Exposure WID new

revised to S5-221552

Alibaba Group Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221196 Key issue and solution on exposure without going through BSS pCR

revised to S5-221714

Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221197 Fixing the "S" qualifier CR

revised to S5-221587

Nokia Germany 28.536 17.1.0 CR#38 catD eCOSLA Rel-17 S5-141-e

AI: 6.4.

revised [WTS] [JSN]
S5-221198 Solution on the relation to other SA5 work/study item pCR Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221199 Resolving the acquisition of operator’s MIB EN pCR

revised to S5-221569

Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221200 Resolving the EN regarding discovery system pCR Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221201 New SID on Fault Supervision Evolution SID new China Mobile Research Inst.; HUAWEI S5-141-e

AI: 6.2

withdrawn [WTS] [JSN]
S5-221202 Resolving the exposure related EN pCR Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221203 New SID on Fault Supervision Evolution SID new

revised to S5-221553

China Mobile Com. Corporation;HUAWEI S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221204 New SID on Management Aspect Enhancement of 5G MOCN Network Sharing SID new

revised to S5-221353

China Unicom Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221205 Rel-17 CR 28.541 Add containment name in IMS SBA nodes CR Huawei 28.541 17.5.0 CR#661 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-221206 Rel-17 CR 28.541 Add N70 N71 stage 3 CR Huawei 28.541 17.5.0 CR#662 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-221207 Rel17 CR 28.541 CN related informtion in EP_Transport CR Huawei 28.541 17.5.0 CR#663 catF adNRM Rel-17 S5-141-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-221208 Discussion on solutions for discovery of management services in 5G discussion Huawei 5GDMS Rel-17 S5-141-e

AI: 6.4.13

noted [WTS] [JSN]
S5-221209 Rel-17 CR 28.622 Add support for discovery of managed entities CR

revised to S5-221597

Huawei 28.622 17.0.0 CR#133 catB 5GDMS Rel-17 S5-141-e

AI: 6.4.13

revised [WTS] [JSN]
S5-221210 Rel-17 CR 28.623 Add support for discovery of managed entities CR

revised to S5-221598

Huawei 28.623 17.0.0 CR#147 catB 5GDMS Rel-17 S5-141-e

AI: 6.4.13

revised [WTS] [JSN]
S5-221211 pCR 28.819 Add use case for test of NF utilizing slicing pCR Huawei, Lenovo 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221212 pCR 28.819 Add use case for network function health analysis pCR Huawei, Lenovo 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221213 pCR 28.819 CI-CD process updates pCR

revised to S5-221716

Huawei 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

revised [WTS] [JSN]
S5-221214 pCR 28.819 clarify feedback to vendor scenario pCR Huawei 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221215 pCR 28.819 update notified of new NF version scenario pCR

revised to S5-221715

Huawei 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

revised [WTS] [JSN]
S5-221216 pCR 28.824 Clarification on access to exposed MnS pCR

revised to S5-221719

Huawei 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221217 pCR 28.104 Add description of coordinated analysis pCR Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221218 pCR 28.104 Requirements cleanup pCR Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221219 Rel-17 PCR TS 28.104 Add Alarm analytics solution-stage 2 pCR Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221220 Rel-17 PCR TS 28.104 Add Alarm analytics solution-stage 3 pCR Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221221 Rel-17 CR 28,541 Update SericeProfile and SliceProfile CR Huawei 28.541 17.5.0 CR#664 catB eMEMTANE Rel-17 S5-141-e

AI: 6.4.7

not pursued [WTS] [JSN]
S5-221222 Rel-17 CR TS 28.533 Add tenant solution description CR Huawei 28.533 17.1.0 CR#99 catB eMEMTANE Rel-17 S5-141-e

AI: 6.4.7

not pursued [WTS] [JSN]
S5-221223 Revised work item on management of the enhanced tenant concept WID revised

revised to S5-221738

Huawei eMEMTANE Rel-17 S5-141-e

AI: 6.4.7

revised [WTS] [JSN]
S5-221224 pCR 28.538 adding EDN IOC pCR

revised to S5-221629

Huawei 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221225 pCR 28.538 adding modification requirement in LCM pCR Huawei 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221226 pCR 28.538 adding query requirement in LCM pCR Huawei 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221227 pCR 28.538 removal of partially failure pCR Huawei 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221228 pCR 28.538 update Edge NRM figure pCR

revised to S5-221630

Huawei 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221229 Rel-17 pCR 32.847 Conclusions for KI#3 pCR

revised to S5-221654

MATRIXX Software 32.847 1.0.0 FS_NETSLICE_CH_Ph2 Rel-17 S5-141-e

AI: 7.5.2

revised [WTS] [JSN]
S5-221230 SID revised was SP-210131 SID on network slice management capability exposure SID revised

revised to S5-221740

Alibaba Group FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221231 New WID on Network Slice charging based on 5G data connectivity WID new

revised to S5-221655

MATRIXX Software Rel-17 S5-141-e

AI: 7.2

revised [WTS] [JSN]
S5-221232 Rel-17 CR 32.255 Introduction of Annex on Network Slice charging CR

revised to S5-221674

MATRIXX Software 32.255 17.4.0 CR#366 catB DUMMY Rel-17 S5-141-e

AI: 7.2

revised [WTS] [JSN]
S5-221233 Update Inventory stage2 to support SBMA CR

revision of S5-216092

Ericsson Hungary Ltd 28.632 16.0.0 CR#51 catB NSA_SBMA Rel-17 S5-141-e

AI: 6.4.19

not pursued [WTS] [JSN]
S5-221234 pCR 28.312 Update the clause 4.5, 6.2.1 and annex A to align with intent definition pCR China Mobile Com. Corporation 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

noted [WTS] [JSN]
S5-221235 New SID on Management Aspects of URLLC SID new China Unicom Rel-18 S5-141-e

AI: 6.2

withdrawn [WTS] [JSN]
S5-221236 Rel-17 CR TS 28.552 Modify description of MIMO PRB usage for cell CR

revised to S5-221539

China Unicom 28.552 17.5.0 CR#344 catF ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

revised [WTS] [JSN]
S5-221237 Rel-17 CR TS 28.552 Modify description of sampling occasion for scheduled layers CR

revised to S5-221540

China Unicom 28.552 17.5.0 CR#345 catF ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

revised [WTS] [JSN]
S5-221238 Update intent fulfillment tracking in information model pCR Nokia Germany 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

noted [WTS] [JSN]
S5-221239 New SID on Basic SBMA enabler enhancements SID new

revised to S5-221506

Nokia, Nokia Shanghai Bell S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221240 Rel-17 CR 28.532 Add jobId to FileInfo CR

revised to S5-221622

Nokia, Nokia Shanghai Bell 28.532 16.10.0 CR#196 catB FIMA Rel-17 S5-141-e

AI: 6.4.17

revised [WTS] [JSN]
S5-221241 New SID on Management Aspects of URLLC SID new

revised to S5-221507

China Unicom Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221242 New Rel-18 SID on alignment with GSMA OPG and ETSI MEC for Edge computing management SID new

revised to S5-221508

Samsung Electronics Benelux BV Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221243 Rel-17 Input to DraftCR 28.622 Resolving editor's notes for FIMA other Nokia, Nokia Shanghai Bell FIMA Rel-17 S5-141-e

AI: 6.4.17

approved [WTS] [JSN]
S5-221244 Rel-17 Input to DraftCR 28.622 Add file download NRM fragment other Nokia, Nokia Shanghai Bell FIMA Rel-17 S5-141-e

AI: 6.4.17

merged [WTS] [JSN]
S5-221245 WI Exception for eNETSLICE_PRO WI exception request

revised to S5-221711

Samsung Electronics Benelux BV NETSLICE-PRO_NS Rel-17 S5-141-e

AI: 6.4.21

revised [WTS] [JSN]
S5-221246 TS 28.531 Add/Modify procedure of reservation of Network Slice/ Network Slice Subnet CR Nokia, Nokia Shanghai Bell 28.531 17.2.0 CR#100 catB eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221247 Rel-17 CR 28.623 Add file retrieval NRM fragment (OpenAPI definitions) CR Nokia, Nokia Shanghai Bell 28.623 17.0.0 CR#148 catB FIMA Rel-17 S5-141-e

AI: 6.4.17

agreed [WTS] [JSN]
S5-221248 Rel-17 CR 28.623 Add file download NRM fragment (OpenAPI definitions) CR

revised to S5-221758

Nokia, Nokia Shanghai Bell 28.623 17.0.0 CR#149 catB FIMA Rel-17 S5-141-e

AI: 6.4.17

revised [WTS] [JSN]
S5-221249 Rel-17 CR 28.531 Fixing Network slice and network slice subnet provisioning management service - profiles convert to IOC - Stage 3 CR Samsung Electronics Benelux BV 28.531 17.2.0 CR#101 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221250 pCR 28.104 Update use case and requirement for MDA assisted energy saving analysis pCR China Telecom Corporation Ltd. 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221251 pCR 28.104 Add MDA capability for MDA assisted energy saving analysis pCR

revised to S5-221612

China Telecom Corporation Ltd. 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221252 Rel-17 CR 28.541 Converting ServiceProfile and SliceProfile to IOC CR Samsung Electronics Benelux BV 28.541 17.5.0 CR#665 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221253 TS 28.531 Asynchronous network slicing procedures using createMOI CR Nokia, Nokia Shanghai Bell 28.531 17.2.0 CR#102 catB eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221254 TS 28.541 Clean up of eMA5SLA CR

revised to S5-221533

CMCC 28.541 17.5.0 CR#666 catF EMA5SLA Rel-17 S5-141-e

AI: 6.4.2

revised [WTS] [JSN]
S5-221255 TS 28.541 Update 5G NRM to solve CR clash in Figure 5.2.1.2 CR CMCC,CATT 28.541 17.5.0 CR#667 catF adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221256 YANG Solution Set for Inventory Management CR

revision of S5-216398

Ericsson Hungary Ltd 28.633 16.0.0 CR#92 catB NSA_SBMA Rel-17 S5-141-e

AI: 6.4.19

not pursued [WTS] [JSN]
S5-221257 S5-xxxxxx Rel-17 CR TS 28.552 Adding new packets based performance measurements CR Harman GmbH 28.552 17.5.0 CR#346 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

withdrawn [WTS] [JSN]
S5-221258 pCR TR 28.824 add solution on eMnS discovery service pCR

revised to S5-221570

AsiaInfo, Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221259 pCR TR 28.824 add procedure for exposed MnS registration pCR

revised to S5-221571

AsiaInfo, Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221260 pCR TS 28.312 Add attributes of the IntentReport pCR AsiaInfo 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

noted [WTS] [JSN]
S5-221261 pCR TS 28.312 update clause 4.2.2 and clause 6.3.3 pCR

revised to S5-221755

AsiaInfo 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

revised [WTS] [JSN]
S5-221262 Rel-16 CR 28.541 Network slice subnet capability IOC CR Samsung Electronics Benelux BV 28.541 17.5.0 CR#668 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221263 New SID on Digital twin for network management SID new CMCC Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221264 S5-xxxxxx Rel-17 CR TS 28.552 Updating packets based performance measurements CR Harman GmbH 28.552 17.5.0 CR#347 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

withdrawn [WTS] [JSN]
S5-221265 Management Aspect of User Plane Enhancement SID new

revised to S5-221509

CMCC Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221266 S5-xxxxxx Rel-17 CR TS 28.554 Define Reliability KPI in 5G Network CR Harman GmbH 28.554 17.5.0 CR#89 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

withdrawn [WTS] [JSN]
S5-221267 pCR 28.824 Describe possible solutions for eMnS discovery service pCR Huawei, Ericsson 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221268 Add S-NSSAI mapping to support National Roaming CR Ericsson India Private Limited (TSDSI) 28.541 17.5.0 CR#669 catB EMA5SLA Rel-17 S5-141-e

AI: 6.4.2

not pursued [WTS] [JSN]
S5-221269 Rel-17 CR 28.531 Network slice subnet capabilities CR Samsung Electronics Benelux BV 28.531 17.2.0 CR#103 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221270 Rel-17 CR 28.531 Fixing Network slice and network slice subnet provisioning management service - profiles not convert to IOC - Stage 3 CR

revised to S5-221710

Samsung Electronics Benelux BV 28.531 17.2.0 CR#104 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

revised [WTS] [JSN]
S5-221271 pCR draft TS28.104, Rapporteur clean- pCR NEC, Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221272 Rel-17 CR 28.552 performance measurements for ECS - EES Registration CR

revised to S5-221638

Samsung Electronics Benelux BV 28.552 17.5.0 CR#348 catB ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221273 pCR draft TS28.104, further clarifications and supporting text for clause 6.3 MDA role in cross-domain service assurance pCR NEC, Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221274 Rel-16 CR 28.622 Add missing definitions of common data types CR

revision of S5-216287

Nokia, Nokia Shanghai Bell 28.622 16.10.0 CR#1073 catF eNRM Rel-16 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221275 Rel-17 CR 28.552 performance measurements for ECS - Service Provisioning CR

revised to S5-221639

Samsung Electronics Benelux BV 28.522 16.0.0 CR#6 catB ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221276 Rel-17 CR 28.552 performance measurements for EES - EAS Discovery CR

revised to S5-221705

Samsung Electronics Benelux BV 28.552 17.5.0 CR#349 catB ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221277 Attachment_3GPP Inputs to GSMA OPAG API Mapping_ after SA5 CH call discussion WG Vice Chair (MATRIXX Software) Rel-17 S5-141-e

AI: 7.1

noted [WTS] [JSN]
S5-221278 Rel-17 CR 28.552 performance measurements for EES - EEC Registration CR

revised to S5-221706

Samsung Electronics Benelux BV 28.552 17.5.0 CR#350 catB ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221279 Rel-17 CR 28.552 performance measurements for EES - EAS Registration CR

revised to S5-221707

Samsung Electronics Benelux BV 28.552 17.5.0 CR#351 catB ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221280 Rel-17 InputToDraftCR 28.537 Targeted management data collection other Samsung Electronics Benelux BV MADCOL Rel-17 S5-141-e

AI: 6.4.8

noted [WTS] [JSN]
S5-221281 Rel-17 InputToDraftCR 28.622 ManagementDataSubscription other Samsung, Ericsson MADCOL Rel-17 S5-141-e

AI: 6.4.8

noted [WTS] [JSN]
S5-221282 Rel-17 Discussion paper on definition of tenant discussion

revised to S5-221547

Ericsson España S.A. Rel-17 S5-141-e

AI: 5.2

revised [WTS] [JSN]
S5-221283 pCR 28.538 ECS Performance MnS pCR

revised to S5-221634

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221284 NRM enhancements for the SMFFunction (stage 3) CR

revised to S5-221556

Nokia Germany 28.541 17.5.0 CR#670 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

revised [WTS] [JSN]
S5-221285 pCR 28.538 ECS Performance assurance pCR

revised to S5-221635

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221286 pCR 28.538 EES Performance MnS pCR

revised to S5-221636

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221287 pCR 28.538 EES Performance assurance pCR

revised to S5-221637

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221288 pCR 28.538 EASFunction Definition pCR

revised to S5-221631

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221289 pCR 28.538 EESFunction definition pCR

revised to S5-221632

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221290 pCR 28.538 EES LCM procedure pCR

revised to S5-221708

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221291 pCR 28.538 ECSFunction Definition pCR

revised to S5-221633

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221292 pCR 28.104 add alarm analysis pCR China Mobile Com. Corporation 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221293 pCR 28.104 add inter-gNB beam selection optimization solution pCR China Mobile Com. Corporation 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221294 pCR 28.104 Add MDA assisted energy saving solution pCR China Mobile Com. Corporation 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

merged [WTS] [JSN]
S5-221295 Updated WID Edge Computing Management WID revised Samsung Electronics Benelux BV ECM Rel-17 S5-141-e

AI: 6.4.18

agreed [WTS] [JSN]
S5-221296 Rel-17 CR 28.622 Add attribute to configure an identifier of a TraceJob CR

revised to S5-221623

Nokia, Nokia Shanghai Bell 28.622 17.0.0 CR#134 catB FIMA Rel-17 S5-141-e

AI: 6.4.17

revised [WTS] [JSN]
S5-221297 Rel-17 28.622 enhance NRM to support access control CR Nokia, Nokia Shanghai Bell 28.622 17.0.0 CR#135 catB MSAC Rel-17 S5-141-e

AI: 6.4.

not pursued [WTS] [JSN]
S5-221298 Rel-17 28.623 enhance NRM to support access control (stage3) CR Nokia, Nokia Shanghai Bell 28.623 17.0.0 CR#150 catB MSAC Rel-17 S5-141-e

AI: 6.4.

not pursued [WTS] [JSN]
S5-221299 Add MDA context pCR

revised to S5-221615

Nokia Germany 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221300 New Rel-18 WID on enhanced Edge Computing Management WID new

revised to S5-221554

Samsung Electronics Benelux BV Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221301 Rel-17 28.532 enhance OpenAPI to support access control CR Nokia, Nokia Shanghai Bell 28.532 16.10.0 CR#197 catB MSAC Rel-17 S5-141-e

AI: 6.4.

withdrawn [WTS] [JSN]
S5-221302 Add MDA types pCR

revised to S5-221603

Nokia Germany 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221303 New WID on enhancement of 5G+ NRM features WID new

revised to S5-221510

Nokia, Nokia Shanghai Bell Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221304 Rel-17 CR 32.291 Correcting response code 2xx CR

revised to S5-221683

Ericsson LM 32.291 17.1.0 CR#369 catF TEI17 Rel-17 S5-141-e

AI: 7.3

revised [WTS] [JSN]
S5-221305 Rel-17 CR 32.291 Correcting response code 3xx CR Ericsson LM 32.291 17.1.0 CR#370 catF TEI17 Rel-17 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221306 Rel-17 CR 32.291 Correcting response code 4xx CR

revised to S5-221684

Ericsson LM 32.291 17.1.0 CR#371 catF TEI17 Rel-17 S5-141-e

AI: 7.3

revised [WTS] [JSN]
S5-221307 Rel-17 CR 32.291 Correcting response code 5xx CR Ericsson LM 32.291 17.1.0 CR#372 catF TEI17 Rel-17 S5-141-e

AI: 7.3

not pursued [WTS] [JSN]
S5-221308 Rel-17 CR 32.255 Correcting charging rule base name CR

revised to S5-221685

Ericsson LM 32.255 17.4.0 CR#367 catF TEI17 Rel-17 S5-141-e

AI: 7.3

revised [WTS] [JSN]
S5-221309 Rel-16 CR 32.291 Correcting quota management suspended CR Ericsson LM 32.291 16.10.0 CR#373 catF CHFCQM Rel-16 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221310 Rel-17 CR 32.291 Correcting quota management suspended CR Ericsson LM 32.291 17.1.0 CR#374 catA CHFCQM Rel-17 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221311 Rel-17 CR 32.291 Addition of IMS converged charging yaml CR

revised to S5-221649

Ericsson LM 32.291 17.1.0 CR#375 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

revised [WTS] [JSN]
S5-221312 Rel-17 CR 32.298 Addition of IMS converged charging ASN.1 CR

revised to S5-221686

Ericsson LM 32.298 17.1.0 CR#887 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

revised [WTS] [JSN]
S5-221313 Rel-17 CR 32.291 Addition of MMTel converged charging yaml CR

revised to S5-221650

Ericsson LM 32.291 17.1.0 CR#376 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

revised [WTS] [JSN]
S5-221314 Rel-17 CR 32.298 Addition of MMTel converged charging ASN.1 CR

revised to S5-221687

Ericsson LM 32.298 17.1.0 CR#888 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

revised [WTS] [JSN]
S5-221315 Rel-17 CR 32.291 Addition of IMS converged charging announcement yaml CR

revised to S5-221651

Ericsson LM 32.291 17.1.0 CR#377 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

revised [WTS] [JSN]
S5-221316 Rel-17 pCR 28.826 Restructuring clauses 5.3 to 5.5 pCR

revised to S5-221682

Ericsson LM 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

revised [WTS] [JSN]
S5-221317 Rel-17 pCR 28.826 Adding PCF based solution to clause 5.5 pCR Ericsson LM 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

noted [WTS] [JSN]
S5-221318 Rel-17 pCR 28.826 Adding use case for operator defined trigger pCR

revised to S5-221726

Ericsson LM 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

revised [WTS] [JSN]
S5-221319 Rel-17 pCR 28.826 Adding service identifier based solution to clause 5.3 pCR Ericsson LM 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

noted [WTS] [JSN]
S5-221320 Rel-17 pCR 28.826 Adding use case for cancel failed event pCR

revised to S5-221736

Ericsson LM 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

revised [WTS] [JSN]
S5-221321 Rel-17 pCR 28.827 Corrections to clause 7.1 pCR

revised to S5-221681

Ericsson LM 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

revised [WTS] [JSN]
S5-221322 Rel-17 pCR 28.827 Corrections to clause 7.2 pCR Ericsson LM 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221323 Rel-17 pCR 28.827 Corrections to clause 7.3 pCR Ericsson LM 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221324 Rel-17 pCR 28.827 Corrections to clause 7.4 pCR Ericsson LM 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221325 Rel-17 pCR 28.827 Adding use case and solution for clause 7.5 pCR Ericsson LM 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

noted [WTS] [JSN]
S5-221326 Rel-17 pCR 28.827 Adding use case and solution for clause 7.6 pCR

revised to S5-221679

Ericsson LM 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

revised [WTS] [JSN]
S5-221327 Presentation sheet for approval to TS 28.538 TS or TR cover

revised to S5-221762

Samsung Electronics Benelux BV ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221328 Correct YANG Network Slice NRM solution set reference CR Ericsson LM 28.622 17.0.0 CR#136 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.3

withdrawn [WTS] [JSN]
S5-221329 New SID Study on Management of Cloud Native Virtualized Network Functions SID new

revised to S5-221511

China Mobile Com. Corporation Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221330 Rel-17 Input to DraftCR 28.622 Add file download control NRM fragment other

revision of S5-216291

revised to S5-221757

Ericsson LM FIMA Rel-17 S5-141-e

AI: 6.4.17

revised [WTS] [JSN]
S5-221331 Add QMC job CR Ericsson LM 28.622 17.0.0 CR#137 catB eQoE Rel-17 S5-141-e

AI: 6.4.5

withdrawn [WTS] [JSN]
S5-221332 pCR 28.105 Add scope pCR

revised to S5-221616

Intel, NEC 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221333 pCR 28.105 Add overview pCR

revised to S5-221617

Intel, NEC 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221334 pCR 28.105 Add service framework for AI-ML model training pCR

revised to S5-221618

Intel, NEC 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221335 pCR 28.105 Move in ML model training part from TS 28.104 pCR Intel 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221336 pCR 28.105 Add NRMs for AI-ML model training pCR

revised to S5-221620

Intel 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221337 Initial skeleton (v000) of TS 28.105 pCR Intel 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221338 pCR 28.104 Move out ML model training part to TS 28.105 pCR

revised to S5-221619

Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221339 pCR 28.104 Update NRM for MDA request pCR

revised to S5-221613

Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221340 Editorial clean up of mobilty KPIs HO success rate CR Ericsson Limited 28.554 16.8.0 CR#90 catF TEI16 Rel-16 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221341 pCR 28.104 Update MDA service framework and data definitions for coverage problem analysis pCR

revised to S5-221607

Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221342 CR Rel-17 28.552 Add measurements to support coverage problem analysis for MDA CR

revised to S5-221608

Intel 28.552 17.5.0 CR#352 catB eMDAS Rel-17 S5-141-e

AI: 6.4.15

revised [WTS] [JSN]
S5-221343 New SID on Advanced Alarm Management for 5G SID new

revised to S5-221368

China Unicom Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221344 CR Rel-17 28.552 Add measurements related to location context transfer for LMF CR

revised to S5-221543

Intel 28.552 17.5.0 CR#353 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

revised [WTS] [JSN]
S5-221345 Editorial clean up of mobilty KPIs HO success rate CR Ericsson Limited 28.554 17.5.0 CR#91 catA E_HOO Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221346 CR Rel-17 28.552 Add measurements related to location determination for LMF CR

revised to S5-221544

Intel 28.552 17.5.0 CR#354 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

revised [WTS] [JSN]
S5-221347 New SID on Network Data Quality Management SID new China Unicom Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221348 pCR 32.257 Add charging information 5GS usage charging for edge enabling pCR

revised to S5-221688

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

revised [WTS] [JSN]
S5-221349 CR Rel-17 32.255 Add charging information for 5GS usage for Edge Computing CR

revised to S5-221720

Intel 32.255 17.4.0 CR#368 catB EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

revised [WTS] [JSN]
S5-221350 pCR 32.257 Add principles and scenarios for edge enabling infrastructure resource usage charging pCR

revised to S5-221658

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

revised [WTS] [JSN]
S5-221351 pCR 32.257 Add charging information definition for edge enabling infrastructure resource usage charging pCR

revised to S5-221659

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

revised [WTS] [JSN]
S5-221352 pCR 32.257 Add principles and scenarios for edge application server deployment charging pCR

revised to S5-221660

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

revised [WTS] [JSN]
S5-221353 New SID on Management Aspect Enhancement of 5G MOCN Network Sharing SID new

revision of S5-221204

revised to S5-221512

China Unicom Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221354 pCR 32.257 Add charging information definition for edge application server deployment charging pCR

revised to S5-221663

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

revised [WTS] [JSN]
S5-221355 pCR 32.257 Add principles and scenarios for edge enabling services charging pCR

revised to S5-221661

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

revised [WTS] [JSN]
S5-221356 Update to include NR and adding VR CR Ericsson Limited 28.405 17.0.0 CR#8 catB eQoE Rel-17 S5-141-e

AI: 6.4.5

agreed [WTS] [JSN]
S5-221357 pCR 32.257 Add charging information definition for edge enabling services charging pCR Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

noted [WTS] [JSN]
S5-221358 Revised WID Charging aspects of edge computing WID revised Intel EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

agreed [WTS] [JSN]
S5-221359 New SID on intent-driven management for network slicing SID new

revised to S5-221513

Ericsson Inc. S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221360 New SID on Knowledge Management Service WID new China Unicom Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221361 WI Exception for ECM WI exception request Samsung Electronics Benelux BV ECM Rel-17 S5-141-e

AI: 6.4.18

noted [WTS] [JSN]
S5-221362 Rel-17 Input to DraftCR 28.537 Add requirements for context data other

revision of S5-216293

revised to S5-221559

Nokia, Nokia Shanghai ell MADCOL Rel-17 S5-141-e

AI: 6.4.8

revised [WTS] [JSN]
S5-221363 Rel-17 Input to DraftCR 28.537 Add requirements for managing external management data other

revision of S5-216292

Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-141-e

AI: 6.4.8

noted [WTS] [JSN]
S5-221364 Rel-17 Input to DraftCR 28.622 Add solution for reporting and storing data other

revision of S5-216294

Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-141-e

AI: 6.4.8

noted [WTS] [JSN]
S5-221365 Rel-17 28.532 enhance OpenAPI to support access control CR Nokia, Nokia Shanghai Bell 28.532 16.10.0 CR#198 catB MSAC Rel-17 S5-141-e

AI: 6.4.

not pursued [WTS] [JSN]
S5-221366 pCR - 28.819 Proposed overall process pCR China Mobile Com. Corporation 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

noted [WTS] [JSN]
S5-221367 pCR draft TS28.104, add historical data handling for MDA pCR NEC, Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

withdrawn [WTS] [JSN]
S5-221368 New SID on Advanced Alarm Management for 5G SID new

revision of S5-221343

China Unicom Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221369 New WID on continuous integration continuous delivery support for 3GPP NFs WID new China Mobile Com. Corporation Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221370 pCR - 28.819 - Solution of test orchestration pCR China Mobile Com. Corporation 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

noted [WTS] [JSN]
S5-221371 Input to DraftCR Add file download NRM fragment, YANG other

revised to S5-221759

Ericsson LM FIMA S5-141-e

AI: 6.4.17

revised [WTS] [JSN]
S5-221372 New SID on Management Model of Base Station SID new China Unicom Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221373 Reply LS on network slice management service consumption LS out

LS To: SA6

revised to S5-221551

Alibaba Group Rel-17 S5-141-e

AI: 5.3

revised [WTS] [JSN]
S5-221374 Rel-17 CR 28.541 Update maximumDeviationHoTrigger CR Ericsson France S.A.S 28.541 17.5.0 CR#671 catC SON_5G Rel-17 S5-141-e

AI: 6.3

withdrawn [WTS] [JSN]
S5-221375 Rel-16 CR 28.552 Correct wording and header CR Ericsson France S.A.S 28.552 16.12.0 CR#355 catF 5G_SLICE_ePA Rel-16 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221376 Rel-17 CR 28.552 Correct wording and header CR Ericsson France S.A.S 28.552 17.5.0 CR#356 catA 5G_SLICE_ePA Rel-17 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221377 Rel-17 CR 28.552 Conditional handover measurements CR

revised to S5-221595

Ericsson France S.A.S 28.552 17.5.0 CR#357 catB E_HOO Rel-17 S5-141-e

AI: 6.4.12

revised [WTS] [JSN]
S5-221378 Rel-17 CR 28.554 Add KPI for HO success rate for all handover types CR

revised to S5-221596

Ericsson France S.A.S 28.554 17.5.0 CR#92 catB E_HOO Rel-17 S5-141-e

AI: 6.4.12

revised [WTS] [JSN]
S5-221379 Input to Draft CR 28.313 E_HOO End-of-release cleanup other Ericsson France S.A.S E_HOO Rel-17 S5-141-e

AI: 6.4.12

approved [WTS] [JSN]
S5-221380 WID Enhancement_Handover_optimization WID revised Ericsson France S.A.S E_HOO Rel-17 S5-141-e

AI: 6.4.12

withdrawn [WTS] [JSN]
S5-221381 DraftCR for E-HOO - TS 28.313 draftCR Ericsson France S.A.S E_HOO Rel-17 S5-141-e

AI: 6.4.12

approved [WTS] [JSN]
S5-221382 Correct maximumDeviationHoTrigger CR

revision of S5-216326

revised to S5-221517

Ericsson France S.A.S 28.541 17.5.0 CR#6331 catC eSON_5G Rel-17 S5-141-e

AI: 6.4.11

revised [WTS] [JSN]
S5-221383 Add Annex with code of UML diagrams CR Ericsson GmbH, Eurolab, Deutsche Telekom 28.536 17.1.0 CR#39 catB eCOSLA Rel-17 S5-141-e

AI: 6.4.

agreed [WTS] [JSN]
S5-221384 pCR 28.312 ServiceDeploymentExpectation definition pCR

revised to S5-221754

Samsung Electronics Benelux BV 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

revised [WTS] [JSN]
S5-221385 Update assurance scope data type description CR Ericsson GmbH, Eurolab, Deutsche Telekom 28.536 17.1.0 CR#40 catF eCOSLA Rel-17 S5-141-e

AI: 6.4.

not pursued [WTS] [JSN]
S5-221386 Discussion paper on cleaning up the eCosla stage 2 descriptions discussion Ericsson GmbH, Eurolab, Deutsche Telekom S5-141-e

AI: 6.4.

noted [WTS] [JSN]
S5-221387 Input to draftCR TS 28.536 clean up stage 2 descriptions CR

revised to S5-221588

Ericsson GmbH, Eurolab, Deutsche Telekom 28.536 17.1.0 CR#41 catC eCOSLA Rel-17 S5-141-e

AI: 6.4.

revised [WTS] [JSN]
S5-221388 Discussion paper on communication service assurance and closed control loops discussion Ericsson GmbH, Eurolab S5-141-e

AI: 6.4.

noted [WTS] [JSN]
S5-221389 Discussion paper on eCosla completion discussion

revised to S5-221589

Ericsson GmbH, Eurolab S5-141-e

AI: 6.4.

revised [WTS] [JSN]
S5-221390 Correct YANG Network Slice NRM solution set reference CR Ericsson LM 28.541 17.5.0 CR#672 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221391 Revised WID on Enhanced Closed loop SLS assurance WID revised

revised to S5-221590

Ericsson GmbH, Eurolab eCOSLA Rel-17 S5-141-e

AI: 6.4.

revised [WTS] [JSN]
S5-221392 Add QMC job, stage 3 YANG module CR Ericsson LM 28.623 17.0.0 CR#151 catB eQoE Rel-17 S5-141-e

AI: 6.4.5

not pursued [WTS] [JSN]
S5-221393 Clarify handling of modified network slice profile CR Ericsson GmbH, Eurolab 28.531 17.2.0 CR#105 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221394 Add network slice job class to NRM discussion CR Ericsson GmbH, Eurolab 28.541 17.5.0 CR#673 catB eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221395 Update high level ProSe architecture CR

revised to S5-221676

CATT 32.277 17.0.0 CR#35 catF 5G_ProSe Rel-17 S5-141-e

AI: 7.4.4

revised [WTS] [JSN]
S5-221396 Update general charging principles for 5G ProSe CR

revised to S5-221662

CATT 32.277 17.0.0 CR#36 catB 5G_ProSe Rel-17 S5-141-e

AI: 7.4.4

revised [WTS] [JSN]
S5-221397 Adding basic principles for 5G ProSe convergent charging CR

revised to S5-221652

CATT 32.277 17.0.0 CR#37 catB 5G_ProSe Rel-17 S5-141-e

AI: 7.4.4

revised [WTS] [JSN]
S5-221398 Adding message flows for 5G ProSe Direct Discovery converged charging CR

revised to S5-221653

CATT 32.277 17.0.0 CR#38 catB 5G_ProSe Rel-17 S5-141-e

AI: 7.4.4

revised [WTS] [JSN]
S5-221399 Update 5GC NRM for 5G_DDNMF CR

revised to S5-221516

CATT 28.541 17.5.0 CR#674 catF adNRM Rel-17 S5-141-e

AI: 6.4.4

revised [WTS] [JSN]
S5-221400 Revised WID on Enhancement of Handover Optimization WID revised Ericsson France S.A.S E_HOO Rel-17 S5-141-e

AI: 6.4.12

agreed [WTS] [JSN]
S5-221401 Rel-17 Input to DraftCR 28.622 Add data collection job to allow consumers without detailed knowledge of the network to request for data draftCR Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-141-e

AI: 6.4.8

noted [WTS] [JSN]
S5-221402 Rel-17 CR 28.622 Add data type to enable operations such as threshold monitoring or data collection according to a schedule CR Nokia, Nokia Shanghai Bell 28.622 17.0.0 CR#138 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-221403 Rel-16 CR 28.622 Structuring of TraceJob IOC and Clean Up CR Nokia, Nokia Shanghai Bell 28.622 16.10.0 CR#139 catF 5GMDT Rel-16 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221404 Rel-17 CR 28.622 Structuring of TraceJob IOC and Clean Up CR Nokia, Nokia Shanghai Bell 28.622 17.0.0 CR#140 catA 5GMDT Rel-17 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221405 Rel-17 CR 28.623 Structuring of TraceJob IOC and Clean Up CR Nokia, Nokia Shanghai Bell 28.623 17.0.0 CR#152 catA 5GMDT Rel-17 S5-141-e

AI: 6.3

not pursued [WTS] [JSN]
S5-221406 Rel-17 CR 28.622 Add parameter to configure beam level measurements in NR MDT CR Nokia, Nokia Shanghai Bell 28.622 17.0.0 CR#141 catB e_5GMDT Rel-17 S5-141-e

AI: 6.4.3

agreed [WTS] [JSN]
S5-221407 Rel-17 CR 28.623 Add parameter to configure beam level measurements in NR MDT CR Nokia, Nokia Shanghai Bell 28.623 17.0.0 CR#153 catB e_5GMDT Rel-17 S5-141-e

AI: 6.4.3

agreed [WTS] [JSN]
S5-221408 Rel-17 CR 28.623 Add attribute to configure an identifier of a TraceJob CR Nokia, Nokia Shanghai Bell 28.623 17.0.0 CR#154 catB FIMA Rel-17 S5-141-e

AI: 6.4.17

agreed [WTS] [JSN]
S5-221409 Discussion paper on Management Data Collection Job discussion Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-141-e

AI: 6.4.7

noted [WTS] [JSN]
S5-221410 Rel-17 draftCR 28.537 Add requirements for data management draftCR

revision of S5-216098

Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-141-e

AI: 6.4.8

noted [WTS] [JSN]
S5-221411 Rel-16 CR 32.422 Alignment of parameter names and clean up CR

revised to S5-221524

Nokia, Nokia Shanghai Bell 32.422 16.8.0 CR#389 catF 5GMDT Rel-16 S5-141-e

AI: 6.3

revised [WTS] [JSN]
S5-221412 Rel-17 CR 32.422 Alignment of parameter names and clean up CR

revised to S5-221525

Nokia, Nokia Shanghai Bell 32.422 17.5.0 CR#390 catA 5GMDT Rel-17 S5-141-e

AI: 6.3

revised [WTS] [JSN]
S5-221413 Rel-17 CR 28.552 Enhance PM on Handover failures per beam related to MRO for intra-system mobility CR Nokia, Nokia Shanghai Bell 28.552 17.5.0 CR#358 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221414 Rel-17 CR 28.552 Add PM on Angle of Arrival CR Nokia, Nokia Shanghai Bell 28.552 17.5.0 CR#359 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

not pursued [WTS] [JSN]
S5-221415 Adding QMC job CR Ericsson Limited 28.622 17.0.0 CR#142 catB eQoE Rel-17 S5-141-e

AI: 6.4.5

not pursued [WTS] [JSN]
S5-221416 YANG Solution Set for Generic Radio Access Network NRM CR

revision of S5-216392

Ericsson Hungary Ltd 28.663 16.0.0 CR#222 catB NSA_SBMA Rel-17 S5-141-e

AI: 6.4.19

not pursued [WTS] [JSN]
S5-221417 TS 28.541 Rel-17 CR TS 28.541 Add Reservation check NRM fragment CR Nokia, Nokia Shanghai Bell 28.541 17.5.0 CR#675 catB eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

not pursued [WTS] [JSN]
S5-221418 Rel-17 CR TS 28.541 Asynchronous Network Slice provisioning using createMOI CR Nokia, Nokia Shanghai Bell 28.541 17.5.0 CR#676 catB eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

withdrawn [WTS] [JSN]
S5-221419 Rel-17 Input to DraftCR 28.622 Add solution for data discovery draftCR Ericsson Telecomunicazioni SpA MADCOL Rel-17 S5-141-e

AI: 6.4.8

noted [WTS] [JSN]
S5-221420 Technical Discussion on TTM reduction for new Service offerings discussion Ericsson Telecomunicazioni SpA IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

noted [WTS] [JSN]
S5-221421 Update intent information model pCR Ericsson Telecomunicazioni SpA 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

noted [WTS] [JSN]
S5-221422 New SID on further Enhancements of Management of Trace/MDT SID new

revised to S5-221514

Nokia, Nokia Shanghai Bell Rel-18 S5-141-e

AI: 6.2

revised [WTS] [JSN]
S5-221423 Add solution for product and service order procedures to clause 7 pCR

revised to S5-221742

Ericsson GmbH, Eurolab 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221424 eMnS service pCR Ericsson GmbH, Eurolab 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221425 Input to issues and gaps in clause 5 pCR Ericsson GmbH, Eurolab 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221426 Input to potential requirements in clause 6 pCR Ericsson GmbH, Eurolab 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221427 Input to potential solutions in clause 7.1 pCR Ericsson GmbH, Eurolab 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221428 Rel-17 CR 28.623 Add data type to enable operations such as threshold monitoring or data collection according to a schedule CR Nokia, Nokia Shanghai Bell 28.622 17.0.0 CR#143 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-221429 Move key issue list out of clause 4 pCR Ericsson GmbH, Eurolab 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221430 Update procedure and add solution for product on-boarding pCR

revised to S5-221743

Ericsson GmbH, Eurolab 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221431 pCR draft TS28.104, add historical data handling for MDA pCR NEC, Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221432 pCR 28.824 Remove EN in 5.4 pCR

revised to S5-221744

Lenovo, Motorola Mobility 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

revised [WTS] [JSN]
S5-221433 pCR 28.824 Update position and add solution for direct MnS exposure pCR Lenovo (Beijing) Ltd 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.4.3

withdrawn [WTS] [JSN]
S5-221434 pCR 28.824 Update position and add solution for direct MnS exposure pCR Lenovo, Motorola Mobility 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221435 pCR 28.819 Add Intro pCR Lenovo, Motorola Mobility, CMCC 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221436 pCR 28.819 Update to feature selection solution pCR Lenovo, Motorola Mobilty, CMCC 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221437 pCR 28.819 Update Simulation Testing with solution pCR Lenovo, Motorola mobility, CMCC 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221438 pCR 28.819 Update Scope pCR

revised to S5-221717

Lenovo, Motorola mobility, CMCC 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

revised [WTS] [JSN]
S5-221439 pCR 28.819 Remove ENs in Section 4.2 and 6.4.2 and 8 pCR Lenovo, Motorola Mobility, CMCC 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221440 pCR 28.819 Remove EN in Section 6.1.3 pCR Lenovo, Motorola Mobility 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221441 S5-221441 pCR 28.819 Add overall process pCR Lenovo, Motorola Mobility 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

noted [WTS] [JSN]
S5-221442 R17 CR 28.536 Add Solution for Pause point CR Lenovo, Motorola Mobility 28.536 17.1.0 CR#42 catB eCOSLA Rel-17 S5-141-e

AI: 6.4.

not pursued [WTS] [JSN]
S5-221443 R17 CR 28.536 Add Solution for Pause point CR Lenovo (Beijing) Ltd 28.536 17.1.0 CR#43 catB eCOSLA Rel-17 S5-141-e

AI: 6.4.

not pursued [WTS] [JSN]
S5-221444 CR 28.536 Add Solution for disabling CL action CR Lenovo (Beijing) Ltd 28.536 17.1.0 CR#44 catB eCOSLA Rel-17 S5-141-e

AI: 6.4.

not pursued [WTS] [JSN]
S5-221445 REl 17 CR 28.535 Convert draft CR S5-215622 CR Lenovo (Beijing) Ltd 28.535 17.4.0 CR#64 catB eCOSLA Rel-17 S5-141-e

AI: 6.4.

not pursued [WTS] [JSN]
S5-221446 LS on RAT Type value for NR Redcap LS out

LS To: CT1,CT3

China Mobile Com. Corporation ARCH_NR_REDCAP Rel-17 S5-141-e

AI: 7.4.3

noted [WTS] [JSN]
S5-221447 Rel-17 CR 32.255 Add charging requirement to support NR RedCap CR

revised to S5-221721

China Mobile Com. Corporation 32.255 17.4.0 CR#369 catB ARCH_NR_REDCAP Rel-17 S5-141-e

AI: 7.4.3

revised [WTS] [JSN]
S5-221448 New R18 SID on MP-CP Conflict management and coordination SID new Lenovo (Beijing) Ltd Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221449 Update of Stage 2 / Stage 3 alignment principles in SA5 working procedures other

revised to S5-221546

SA5 Chair, SA5 Vice chair (Huawei) S5-141-e

AI: 5.1

revised [WTS] [JSN]
S5-221450 Rel-17 CR TS 28.552 Adding new packets based performance measurements CR

revised to S5-221545

Harman GmbH 28.552 17.5.0 CR#360 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

revised [WTS] [JSN]
S5-221451 Rel-17 CR TS 28.552 Updating packets based performance measurements CR

revised to S5-221541

Harman GmbH 28.552 17.5.0 CR#361 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

revised [WTS] [JSN]
S5-221452 Rel-17 CR TS 28.554 Define Reliability KPI in 5G Network CR Harman GmbH 28.552 17.5.0 CR#362 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

not pursued [WTS] [JSN]
S5-221453 Resubmitted LS on Guidelines on Port Allocation for New 3GPP Interfaces LS in C4-214848 S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221454 Reply LS on Guidelines on Port Allocation for New 3GPP Interfaces LS in R3-216233 S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221455 LS on the first deliverable on use cases for autonomous networks from ITU FG-AN LS in ITU-T FOCUS GROUP ON AUTONOMOUS NETWORKS (FG-AN) S5-141-e

AI: 5.3

postponed [WTS] [JSN]
S5-221456 Liaison: AN LS22: 0001 TM Forum, AN team Response, to liaison S5-215486 LS in

LS reply in S5-221493, S5-221493

TM Forum S5-141-e

AI: 5.3

replied to [WTS] [JSN]
S5-221457 Resubmitted LS APT REPORT ON EMERGING CRITICAL APPLICATIONS & USE CASES OF IMT FOR INDUSTRIAL, SOCIETAL AND ENTERPRISE USERS LS in APT Wireless Group S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221458 Liaison Multi-SDO Autonomous Networks (AN) Formal Liaison: Minutes and Actions 22nd Nov 2021 Meeting #13 Ref AN-SDO2021-13 LS in TM Forum S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221459 Resubmitted Liaison Multi-SDO Autonomous Networks Liaison: Intent Management documents for information and feedback LS in TM Forum S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221460 Liaison Multi-SDO Autonomous Networks (AN) Formal Liaison: 22nd November 2021 Meeting Invitation, Agenda, Bridge, and Meeting Schedule Ref AN-SDO2021-13 LS in TM Forum S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221461 Multi-SDO Autonomous Networks (AN) Formal Liaison: Notification of Open Presentation 14th Jan and 31st Jan 2020 (postponed December) formal meeting #15 Ref AN-SDO2022-01 LS in TM Forum S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221462 Reply LS from GSMA Operator Platform API Group to 3GPP SA, SA2, SA5, SA6 and ETSI ISG MEC on edge computing definition and integration LS in GSMA S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221463 Reply LS from GSMA Operator Platform Group to 3GPP SA, SA2, SA5, SA6 and ETSI ISG MEC on edge computing definition and integration. LS in GSMA S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221464 Reply LS ccSA5 on Beam measurement reports for the MDT measurements LS in R2-2111476 S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221465 Reply LS ccSA5 on MDT Stage 2 and Stage 3 Alignment (reply LS to R3-207222) LS in R2-2111567 S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221466 LS ccSA5 on RAN visible QoE LS in R2-2111603 S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221467 Resubmitted LS on RAN3 agreements for NR QoE LS in R3-214477 S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221468 Reply LS (to S5-214652) on the F1 interface for MOCN network sharing for multiple Cell Identity broadcast scenario LS in R3-216218 S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221469 Response to LS Reply LS on Enhancement of RAN Slicing LS in R3-216238 S5-141-e

AI: 6.1

postponed [WTS] [JSN]
S5-221470 Resubmitted LS on introducing NR RedCap Indication LS in S2-2107853 S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221471 Resubmitted LS on MINT functionality for Disaster Roaming LS in S2-2108172 S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221472 Reply LS ccSA5 on LS on MINT functionality for Disaster Roaming LS in S3-214342 S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221473 Reply LS ccSA5 on LS on MINT functionality for Disaster Roaming LS in S3-214416 S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221474 Reply LS ccSA5 on QoE report handling at QoE pause LS in S3-214458 S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221475 Resubmitted LS on TS 28.404/TS 28.405 Clarification LS in S4-211234 S5-141-e

AI: 6.1

postponed [WTS] [JSN]
S5-221476 Resubmitted LS on slicing management aspects in relation to SEAL LS in

LS reply in S5-221548, S5-221548

S6-210709 S5-141-e

AI: 5.3

replied to [WTS] [JSN]
S5-221477 Resubmitted LS on network slice management service consumption LS in

LS reply in S5-221560, S5-221551, S5-221560

S6-212460 S5-141-e

AI: 6.1

replied to [WTS] [JSN]
S5-221478 LS/r on autonomous network levels (reply to 3GPP TSG SA5-S5-215539) LS in

LS reply in S5-221492, S5-221492

ITU-T SG2 S5-141-e

AI: 5.3

replied to [WTS] [JSN]
S5-221479 LS on the Consent of Recommendation ITU-T M.3381 (ex. M.resm-AI), "Requirements for energy saving management of 5G RAN system with AI" LS in

LS reply in S5-221502, S5-221502

ITU-T SG2 S5-141-e

AI: 5.3

replied to [WTS] [JSN]
S5-221480 LS on consideration of a new work on ITU-T M.fcnhe: "Framework of communication network health evaluation" LS in ITU-T SG2 S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221481 LS/r on methodology harmonization update (reply to 3GPP TSG SA5-S5-215481) LS in ITU-T SG2 S5-141-e

AI: 6.1

postponed [WTS] [JSN]
S5-221482 LS on ongoing work within ITU-T Study Group 3 (SG3) on new Technical Report on “IMT2020-Related Policy Considering MVNOs” LS in ITU-T SG3 S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221483 LS on Energy Efficiency as guiding principle for new solutions LS in

LS reply in S5-221501, S5-221501

SP-211621 S5-141-e

AI: 5.3

replied to [WTS] [JSN]
S5-221484 TR 28.827, Adding Conclusions pCR

revised to S5-221656

Vodafone Italia SpA,MATRIXX Software 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

revised [WTS] [JSN]
S5-221485 Multi-SDO Autonomous Networks (AN) Formal Liaison: Notification of Open Presentation 14th Jan and 21st February 2022 (postponed December) formal meeting #15 Ref AN-SDO2022-01 rev 1 LS in TM Forum S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221486 Forge process update of clause 23.4 and 23.9 in SA5 Working Procedures other WG chair S5-141-e

AI: 5.1

approved [WTS] [JSN]
S5-221487 Rel-18 work prioritization other

revised to S5-221500

WG chair S5-141-e

AI: 5.1

revised [WTS] [JSN]
S5-221488 Correct YANG mapping in TS document CR Ericsson Hungary Ltd 28.541 16.11.0 CR#677 catF eNRM Rel-16 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221489 Correct YANG mapping in TS document CR Ericsson Hungary Ltd 28.541 17.5.0 CR#678 catA eNRM Rel-17 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221490 e-meeting process discussion

revision of S5-221002

WG Chair S5-141-e

AI: 5.1

noted [WTS] [JSN]
S5-221491 Reply LS ccSA5 to GSMA Operator Platform Group on edge computing definition and integration LS in SP-220003 S5-141-e

AI: 5.3

noted [WTS] [JSN]
S5-221492 Reply to: LS/r on autonomous network levels (reply to 3GPP TSG SA5-S5-215539) LS out

LS is reply to S5-221478

LS To: ITU-T SG2

CMCC S5-141-e

AI: 5.3

approved [WTS] [JSN]
S5-221493 Reply to: Liaison: AN LS22: 0001 TM Forum, AN team Response, to liaison S5-215486 LS out

LS is reply to S5-221456

LS To: TM Forum

Ericsson S5-141-e

AI: 5.3

approved [WTS] [JSN]
S5-221494 Reply LS on Intent Management documents for information and feedback other Ericsson S5-141-e

AI: 5.3

withdrawn [WTS] [JSN]
S5-221495 Rel-16 CR TS 32.422 Correct the value of Report Interval in NR for alignment CR China Telecom 32.422 16.8.0 CR#391 catF TEI16 Rel-16 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221496 Rel-17 CR TS 32.256 Clarify definition of AllowedValues CR Ericsson 32.156 16.4.0 CR#40 catF TEI17 Rel-17 S5-141-e

AI: 6.1

agreed [WTS] [JSN]
S5-221497 Forge working procedure change in SA5 Working Procedures other

revision of S5-221059

Nokia, Nokia Shanghai Bell S5-141-e

AI: 5.1

agreed [WTS] [JSN]
S5-221498 Updated SA5 working procedures other WG Chair S5-141-e

AI: 5.1

approved [WTS] [JSN]
S5-221499 Revised WID Rel-17 NSA_SBMA WID revised Ericsson NSA_SBMA Rel-17 S5-141-e

AI: 6.4.19

agreed [WTS] [JSN]
S5-221500 Rel-18 work prioritization discussion

revision of S5-221487

WG chair S5-141-e

AI: 5.1

endorsed [WTS] [JSN]
S5-221501 Reply LS to SA on energy efficiency as guiding principle for new solutions LS out

LS is reply to S5-221483

source LS: SP-211621

LS To: SA

revision of S5-221015

Orange S5-141-e

AI: 5.3

approved [WTS] [JSN]
S5-221502 Reply LS on Recommendation ITU-T M.3381 LS out

LS is reply to S5-221479

source LS: SG2-LS224

LS To: ITU-T SG2

revision of S5-221016

Intel, NEC, Orange S5-141-e

AI: 5.3

approved [WTS] [JSN]
S5-221503 CR Rel-17 TS 28.533 Add 5G specification information CR

revision of S5-221165

Huawei Technologies (Korea) 28.533 17.1.0 CR#981 catF TEI17 Rel-17 S5-141-e

AI: 6.1

agreed [WTS] [JSN]
S5-221504 CR Rel-16 TS 32.103 Remove 5G specification information CR

revision of S5-221167

Huawei Technologies (Korea) 32.103 16.2.0 CR#331 catF TEI16 Rel-16 S5-141-e

AI: 6.1

agreed [WTS] [JSN]
S5-221505 Preparation of checking the Rel-17 OAM work progress discussion

revision of S5-221194

SA5 Vice chair (Huawei) S5-141-e

AI: 6.1

noted [WTS] [JSN]
S5-221506 New SID on Basic SBMA enabler enhancements SID new

revision of S5-221239

Nokia, Nokia Shanghai Bell S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221507 New SID on Management Aspects of URLLC SID new

revision of S5-221241

China Unicom Rel-18 S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221508 New Rel-18 SID on alignment with GSMA OPG and ETSI MEC for Edge computing management SID new

revision of S5-221242

Samsung Electronics Benelux BV Rel-18 S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221509 Management Aspect of User Plane Enhancement SID new

revision of S5-221265

CMCC Rel-18 S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221510 New WID on enhancement of 5G+ NRM features WID new

revision of S5-221303

Nokia, Nokia Shanghai Bell Rel-18 S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221511 New SID Study on Management of Cloud Native Virtualized Network Functions SID new

revision of S5-221329

China Mobile Com. Corporation Rel-18 S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221512 New SID on Management Aspect Enhancement of 5G MOCN Network Sharing SID new

revision of S5-221353

China Unicom Rel-18 S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221513 New SID on intent-driven management for network slicing SID new

revision of S5-221359

Ericsson Inc. S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221514 New SID on further Enhancements of Management of Trace/MDT SID new

revision of S5-221422

Nokia, Nokia Shanghai Bell Rel-18 S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221515 Input to draftCR TS 28.536 clean up stage 2 descriptions other Ericsson GmbH, Eurolab, Deutsche Telekom eCOSLA Rel-17 S5-141-e

AI: 6.4.

approved [WTS] [JSN]
S5-221516 Update 5GC NRM for 5G_DDNMF CR

revision of S5-221399

CATT 28.541 17.5.0 CR#6741 catF adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221517 Correct maximumDeviationHoTrigger CR

revision of S5-221382

Ericsson France S.A.S 28.541 17.5.0 CR#6332 catC eSON_5G Rel-17 S5-141-e

AI: 6.4.11

agreed [WTS] [JSN]
S5-221518 Notification Subscription changes CR

revision of S5-221064

Ericsson Hungary Ltd 28.622 16.10.0 CR#1291 catF eNRM Rel-16 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221519 Notification Subscription changes CR

revision of S5-221027

Ericsson Hungary Ltd 28.622 17.0.0 CR#1281 catA eNRM Rel-17 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221520 Alarm Record changes CR

revision of S5-221065

Ericsson Hungary Ltd 28.622 16.10.0 CR#1301 catF eNRM Rel-16 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221521 Alarm Record changes CR

revision of S5-221026

Ericsson Hungary Ltd 28.622 17.0.0 CR#1271 catA eNRM Rel-17 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221522 Specifying multivalue attributes CR

revision of S5-221025

Ericsson Hungary Ltd 32.156 16.4.0 CR#391 catF eNRM Rel-16 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221523 Rel-17 CR TS 32.422 Correct the value of Report Interval in NR for alignment CR

revision of S5-221148

China Telecom Corporation Ltd. 32.422 17.5.0 CR#3841 catA TEI16 Rel-17 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221524 Rel-16 CR 32.422 Alignment of parameter names and clean up CR

revision of S5-221411

Nokia, Nokia Shanghai Bell 32.422 16.8.0 CR#3891 catF 5GMDT Rel-16 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221525 Rel-17 CR 32.422 Alignment of parameter names and clean up CR

revision of S5-221412

Nokia, Nokia Shanghai Bell 32.422 17.5.0 CR#3901 catA 5GMDT Rel-17 S5-141-e

AI: 6.3

agreed [WTS] [JSN]
S5-221526 pCR 28.557 Add new NPN management related requirements pCR

revision of S5-221038

TELEFONICA S.A. 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221527 pCR 28.557 Solution for management of SNPN pCR

revision of S5-221082

Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221528 pCR 28.557 Update solution for NPN provisioning by a network slice of a PLMN pCR

revision of S5-221083

Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221529 pCR 28.557 Solution for collecting UE related data pCR

revision of S5-221085

Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221530 pCR 28.557 Use case of collecting UE related data pCR

revision of S5-221086

Huawei 28.557 1.2.0 OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221531 Rel-17 CR 28.541 Update RANSliceSubnetProfile attributes CR

revision of S5-221035

TELEFONICA S.A. 28.541 17.5.0 CR#6451 catF EMA5SLA Rel-17 S5-141-e

AI: 6.4.2

agreed [WTS] [JSN]
S5-221532 Rel-17 CR 28.541 Update energy efficiency attribute CR

revision of S5-221080

Huawei 28.541 17.5.0 CR#6511 catF EMA5SLA Rel-17 S5-141-e

AI: 6.4.2

agreed [WTS] [JSN]
S5-221533 TS 28.541 Clean up of eMA5SLA CR

revision of S5-221254

CMCC 28.541 17.5.0 CR#6661 catF EMA5SLA Rel-17 S5-141-e

AI: 6.4.2

agreed [WTS] [JSN]
S5-221534 Add MDT reporting for NR CR

revision of S5-221168

Ericsson LM 32.422 17.5.0 CR#3861 catB e_5GMDT Rel-17 S5-141-e

AI: 6.4.3

agreed [WTS] [JSN]
S5-221535 Add MDT signalling activation and deactivation mechanisms in a split architecture for NR CR

revision of S5-221170

Ericsson LM 32.422 17.5.0 CR#3871 catB e_5GMDT Rel-17 S5-141-e

AI: 6.4.3

agreed [WTS] [JSN]
S5-221536 Add MDT management activation and deactivation mechanism in the case of split architecture for NR CR

revision of S5-221172

Ericsson LM 32.422 17.5.0 CR#3881 catB e_5GMDT Rel-17 S5-141-e

AI: 6.4.3

agreed [WTS] [JSN]
S5-221537 Discussion on RACH NSA measurements discussion

revision of S5-221017

Nokia Solutions & Networks (I) ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

endorsed [WTS] [JSN]
S5-221538 Add Space Division Multiplexing PRB Usage for MIMO cell CR

revision of S5-221058

CMCC, Huawei, ZTE 28.552 17.5.0 CR#3411 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221539 Rel-17 CR TS 28.552 Modify description of MIMO PRB usage for cell CR

revision of S5-221236

China Unicom 28.552 17.5.0 CR#3441 catF ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221540 Rel-17 CR TS 28.552 Modify description of sampling occasion for scheduled layers CR

revision of S5-221237

China Unicom 28.552 17.5.0 CR#3451 catF ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221541 Rel-17 CR TS 28.552 Updating packets based performance measurements CR

revision of S5-221451

Harman GmbH 28.552 17.5.0 CR#3611 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221542 Rel-17 CR TS 28.554 Define Reliability KPI in 5G Network CR Harman GmbH 28.554 17.5.0 CR#93 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221543 CR Rel-17 28.552 Add measurements related to location context transfer for LMF CR

revision of S5-221344

Intel 28.552 17.5.0 CR#3531 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221544 CR Rel-17 28.552 Add measurements related to location determination for LMF CR

revision of S5-221346

Intel 28.552 17.5.0 CR#3541 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221545 Rel-17 CR TS 28.552 Adding new packets based performance measurements CR

revision of S5-221450

Harman GmbH 28.552 17.5.0 CR#3601 catB ePM_KPI_5G Rel-17 S5-141-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-221546 Update of Stage 2 / Stage 3 alignment principles in SA5 working procedures other

revision of S5-221449

SA5 Chair, SA5 Vice chair (Huawei) S5-141-e

AI: 5.1

endorsed [WTS] [JSN]
S5-221547 Rel-17 Discussion paper on definition of tenant discussion

revision of S5-221282

Ericsson España S.A. Rel-17 S5-141-e

AI: 5.2

endorsed [WTS] [JSN]
S5-221548 Reply LS on slicing management aspects in relation to SEAL LS out

LS is reply to S5-221476

LS To: SA6

revision of S5-221079

Huawei Rel-17 S5-141-e

AI: 5.3

approved [WTS] [JSN]
S5-221549 Asynchronous operation NRM additions CR

revision of S5-221023

Ericsson Hungary Ltd 28.622 17.0.0 CR#1261 catC adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221550 Asynchronous operation NRM additions - YANG Stage 3 CR

revision of S5-221024

Ericsson Hungary Ltd 28.623 17.0.0 CR#1441 catC adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221551 Reply LS on network slice management service consumption LS out

LS is reply to S5-221477

LS To: SA6

revision of S5-221373

revised to S5-221560

Alibaba Group Rel-17 S5-141-e

AI: 5.3

revised [WTS] [JSN]
S5-221552 New WID on Network Slice Management Capability Exposure WID new

revision of S5-221195

Alibaba Group Rel-18 S5-141-e

AI: 6.2

noted [WTS] [JSN]
S5-221553 New SID on Fault Supervision Evolution SID new

revision of S5-221203

China Mobile Com. Corporation;HUAWEI S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221554 New Rel-18 WID on enhanced Edge Computing Management WID new

revision of S5-221300

Samsung Electronics Benelux BV Rel-18 S5-141-e

AI: 6.2

agreed [WTS] [JSN]
S5-221555 NRM enhacements for SMFFunction CR

revision of S5-221180

Nokia Germany 28.541 17.5.0 CR#6581 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221556 NRM enhancements for the SMFFunction (stage 3) CR

revision of S5-221284

Nokia Germany 28.541 17.5.0 CR#6701 catB adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221557 Adding Signalling Based Activation for NR CR

revision of S5-221042

Ericsson Limited 28.405 17.0.0 CR#61 catB eQoE Rel-17 S5-141-e

AI: 6.4.5

not pursued [WTS] [JSN]
S5-221558 Rel-17 CR TS 28.541 Add tenant IOC to support multiple tenant environment CR

revision of S5-221161

Huawei 28.541 17.5.0 CR#5384 catB eMEMTANE Rel-17 S5-141-e

AI: 6.4.7

not pursued [WTS] [JSN]
S5-221559 Rel-17 Input to DraftCR 28.537 Add requirements for context data other

revision of S5-221362

Nokia, Nokia Shanghai ell MADCOL Rel-17 S5-141-e

AI: 6.4.8

approved [WTS] [JSN]
S5-221560 Reply LS on network slice management service consumption LS out

LS is reply to S5-221477

LS To: SA6

revision of S5-221551

Alibaba Group Rel-17 S5-141-e

AI: 5.3

approved [WTS] [JSN]
S5-221565 pCR 28.538 Edge NRM Stage-3 pCR Samsung 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221566 TS 28.541 Correct NR YAML in TS document CR Huawei 28.541 17.5.0 CR#679 catF adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221567 TS 28.541 Correct 5GC YAML in TS document CR Huawei 28.541 17.5.0 CR#680 catF adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221568 TS 28.541 Correct NetworkSlicing YAML in TS document CR Huawei 28.541 17.5.0 CR#681 catF adNRM Rel-17 S5-141-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-221569 Resolving the acquisition of operator’s MIB EN pCR

revision of S5-221199

Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221570 pCR TR 28.824 add solution on eMnS discovery service pCR

revision of S5-221258

AsiaInfo, Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

approved [WTS] [JSN]
S5-221571 pCR TR 28.824 add procedure for exposed MnS registration pCR

revision of S5-221259

AsiaInfo, Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

noted [WTS] [JSN]
S5-221572 exception sheet for eMDAS WI exception request Intel eMDAS S5-141-e

AI: 6.4.15

agreed [WTS] [JSN]
S5-221573 presentation sheet for TS 28.104 TS or TR cover Intel eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221574 presentation sheet for TS 28.105 TS or TR cover Intel eMDAS Rel-18 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221575 pCR TS 28.312 Update RadioNetworkExpectation pCR

revision of S5-221134

Huawei, China Mobile, China Unicom,, Deutsche Telekom 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221576 Revised WID for MADCOL WID revised Nokia MADCOL Rel-17 S5-141-e

AI: 6.4.8

agreed [WTS] [JSN]
S5-221577 Exception Sheet for MADCOL WI exception request Nokia MADCOL S5-141-e

AI: 6.4.8

agreed [WTS] [JSN]
S5-221578 Rel-17 CR 28.541 Add Stage 3 solutions to support ECM CR Intel 28.541 17.5.0 CR#682 catB ECM Rel-17 S5-141-e

AI: 6.4.18

agreed [WTS] [JSN]
S5-221580 pCR TS 28.312 Align the description for general concept of intent content pCR

revision of S5-221132

Huawei,Nokia, Deutsche Telekom,AsiaInfo 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221581 pCR TS 28.312 Update intent information model pCR

revision of S5-221133

Huawei, China Mobile, China Unicom, Nokia, Deutsche Telekom,AsiaInfo 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221582 pCR TS 28.312 Clean up on procedures pCR

revision of S5-221135

Huawei, Deutsche Telekom 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221583 Presentation sheet of TS 28.312 for SA Information and Approval TS or TR cover

revision of S5-221154

Huawei IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221584 pCR TS 28.312 Add feasibility check to the procedures for intent management pCR

revision of S5-221078

China Mobile Com. Corporation 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221585 pCR TS 28.312 Rapporteur clean up pCR

revision of S5-221131

Huawei 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221586 Editorial on the definition of AssuranceClosedControlLoop CR

revision of S5-221048

Nokia Germany 28.536 17.1.0 CR#371 catF eCOSLA Rel-17 S5-141-e

AI: 6.4.

agreed [WTS] [JSN]
S5-221587 Fixing the "S" qualifier CR

revision of S5-221197

Nokia Germany 28.536 17.1.0 CR#381 catF eCOSLA Rel-17 S5-141-e

AI: 6.4.

agreed [WTS] [JSN]
S5-221588 Input to draftCR TS 28.536 clean up stage 2 descriptions CR

revision of S5-221387

Ericsson GmbH, Eurolab, Deutsche Telekom 28.536 17.1.0 CR#411 catC eCOSLA Rel-17 S5-141-e

AI: 6.4.

not pursued [WTS] [JSN]
S5-221589 Discussion paper on eCosla completion discussion

revision of S5-221389

Ericsson GmbH, Eurolab S5-141-e

AI: 6.4.

endorsed [WTS] [JSN]
S5-221590 Revised WID on Enhanced Closed loop SLS assurance WID revised

revision of S5-221391

Ericsson GmbH, Eurolab eCOSLA Rel-17 S5-141-e

AI: 6.4.

agreed [WTS] [JSN]
S5-221591 Rel-17 CR 28.313 Add information in the PCI configuration notification CR

revision of S5-221074

Intel 28.313 17.3.0 CR#451 catB eSON_5G Rel-17 S5-141-e

AI: 6.4.11

agreed [WTS] [JSN]
S5-221592 Rel-17 CR 28.313 Add information in the C-SON notification CR

revision of S5-221075

Intel 28.313 17.3.0 CR#461 catB eSON_5G Rel-17 S5-141-e

AI: 6.4.11

agreed [WTS] [JSN]
S5-221593 Rel-17 CR 28.541 Add C-SON CCO NRM model stage3 CR

revision of S5-221192

Huawei 28.541 17.5.0 CR#6601 catB eSON_5G Rel-17 S5-141-e

AI: 6.4.11

agreed [WTS] [JSN]
S5-221594 Rel-17 CR 28.541 Add C-SON CCO NRM model stage2 CR

revision of S5-221191

Huawei 28.541 17.5.0 CR#6591 catB eSON_5G Rel-17 S5-141-e

AI: 6.4.11

agreed [WTS] [JSN]
S5-221595 Rel-17 CR 28.552 Conditional handover measurements CR

revision of S5-221377

Ericsson France S.A.S 28.552 17.5.0 CR#3571 catB E_HOO Rel-17 S5-141-e

AI: 6.4.12

agreed [WTS] [JSN]
S5-221596 Rel-17 CR 28.554 Add KPI for HO success rate for all handover types CR

revision of S5-221378

Ericsson France S.A.S 28.554 17.5.0 CR#921 catB E_HOO Rel-17 S5-141-e

AI: 6.4.12

agreed [WTS] [JSN]
S5-221597 Rel-17 CR 28.622 Add support for discovery of managed entities CR

revision of S5-221209

Huawei 28.622 17.0.0 CR#1331 catB 5GDMS Rel-17 S5-141-e

AI: 6.4.13

agreed [WTS] [JSN]
S5-221598 Rel-17 CR 28.623 Add support for discovery of managed entities CR

revision of S5-221210

Huawei 28.623 17.0.0 CR#1471 catB 5GDMS Rel-17 S5-141-e

AI: 6.4.13

agreed [WTS] [JSN]
S5-221599 Rel-17 CR TS 28.541 Alignment on NR NRM for MOCN network sharing CR

revision of S5-221136

Huawei,Orange,China Mobile,China Unicom,China Telecom, Deutsche Telekom,Ericsson,Telefonica 28.541 17.5.0 CR#6521 catF MANS Rel-17 S5-141-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-221600 Rel-17 CR TS 32.130 Add solution description for the requirements for the management of the shared NG-RAN NE(s) in MOCN network sharing scenario CR

revision of S5-221139

Huawei,Orange,China Mobile, China Unicom,China Telecom, Deutsche Telekom,Ericsson,Telefonica 32.13 17.3.0 CR#191 catB MANS Rel-17 S5-141-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-221601 Rel-17 CR TS 28.541 Add administrativeState attribute in OperatorNRCellDU CR

revision of S5-221171

ZTE Corporation, China Unicom 28.541 17.5.0 CR#6531 catB MANS Rel-17 S5-141-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-221602 Including individual PM, KPI, trace and QoE statistics and predictions as additional MDA types pCR

revision of S5-221046

Nokia Germany 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221603 Add MDA types pCR

revision of S5-221302

Nokia Germany 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221604 CR Rel-17 28.622 Enhance NRM with geographical information supporting MDA CR

revision of S5-221076

Intel 28.622 17.0.0 CR#1311 catB eMDAS Rel-17 S5-141-e

AI: 6.4.15

agreed [WTS] [JSN]
S5-221605 CR Rel-17 28.623 Enhance NRM with geographical information supporting MDA CR

revision of S5-221077

Intel 28.623 17.0.0 CR#1461 catB eMDAS Rel-17 S5-141-e

AI: 6.4.15

agreed [WTS] [JSN]
S5-221606 pCR TS 28.104 add coverage issue analytics output area definition--stage2 pCR

revision of S5-221183

Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221607 pCR 28.104 Update MDA service framework and data definitions for coverage problem analysis pCR

revision of S5-221341

Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221608 CR Rel-17 28.552 Add measurements to support coverage problem analysis for MDA CR

revision of S5-221342

Intel 28.552 17.5.0 CR#3521 catB eMDAS Rel-17 S5-141-e

AI: 6.4.15

agreed [WTS] [JSN]
S5-221609 pCR TS28.104 Add E2E latency analysis solution pCR

revision of S5-221140

Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221610 pCR TS28.104 Add network slice throughput analysis solution pCR

revision of S5-221144

Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221611 pCR TS28.104 Add network slice load analysis solution pCR

revision of S5-221146

Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221612 pCR 28.104 Add MDA capability for MDA assisted energy saving analysis pCR

revision of S5-221251

China Telecom Corporation Ltd. 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221613 pCR 28.104 Update NRM for MDA request pCR

revision of S5-221339

Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221614 pCR TS28.104 Add the requirements for ML model training for MDA pCR

revision of S5-221190

Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221615 Add MDA context pCR

revision of S5-221299

Nokia Germany 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221616 pCR 28.105 Add scope pCR

revision of S5-221332

Intel, NEC 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221617 pCR 28.105 Add overview pCR

revision of S5-221333

Intel, NEC 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221618 pCR 28.105 Add service framework for AI-ML model training pCR

revision of S5-221334

Intel, NEC 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221619 pCR 28.104 Move out ML model training part to TS 28.105 pCR

revision of S5-221338

Intel 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221620 pCR 28.105 Add NRMs for AI-ML model training pCR

revision of S5-221336

Intel 28.105 0.0.0 eMDAS Rel-18 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221621 pCR TS 28.104 add MDA related service components pCR

revision of S5-221189

Huawei 28.104 17.3.0 TEI17_SAPES Rel-17 S5-141-e

AI: 6.4.15

noted [WTS] [JSN]
S5-221622 Rel-17 CR 28.532 Add jobId to FileInfo CR

revision of S5-221240

Nokia, Nokia Shanghai Bell 28.532 16.10.0 CR#1961 catB FIMA Rel-17 S5-141-e

AI: 6.4.17

agreed [WTS] [JSN]
S5-221623 Rel-17 CR 28.622 Add attribute to configure an identifier of a TraceJob CR

revision of S5-221296

Nokia, Nokia Shanghai Bell 28.622 17.0.0 CR#1341 catB FIMA Rel-17 S5-141-e

AI: 6.4.17

agreed [WTS] [JSN]
S5-221624 pCR 28.538 add fault supervision procedures pCR

revision of S5-221067

Intel 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221625 pCR 28.538 add provisioning use cases pCR

revision of S5-221068

Intel 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221626 pCR 28.538 add provisioning procedures pCR

revision of S5-221069

Intel 28.538 0.4.0 IDMS_MN, ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221627 Rel-17 CR 28.541 Add Stage 2 solutions to support ECM CR

revision of S5-221073

Intel 28.541 17.5.0 CR#6501 catB ECM Rel-17 S5-141-e

AI: 6.4.18

agreed [WTS] [JSN]
S5-221628 pCR 28.538 add relevent NRM changes to support ECM use cases pCR

revision of S5-221070

Intel 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221629 pCR 28.538 adding EDN IOC pCR

revision of S5-221224

Huawei 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221630 pCR 28.538 update Edge NRM figure pCR

revision of S5-221228

Huawei 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221631 pCR 28.538 EASFunction Definition pCR

revision of S5-221288

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221632 pCR 28.538 EESFunction definition pCR

revision of S5-221289

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221633 pCR 28.538 ECSFunction Definition pCR

revision of S5-221291

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221634 pCR 28.538 ECS Performance MnS pCR

revision of S5-221283

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221635 pCR 28.538 ECS Performance assurance pCR

revision of S5-221285

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221636 pCR 28.538 EES Performance MnS pCR

revision of S5-221286

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221637 pCR 28.538 EES Performance assurance pCR

revision of S5-221287

revised to S5-221739

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

revised [WTS] [JSN]
S5-221638 Rel-17 CR 28.552 performance measurements for ECS - EES Registration CR

revision of S5-221272

Samsung Electronics Benelux BV 28.552 17.5.0 CR#3481 catB ECM Rel-17 S5-141-e

AI: 6.4.18

agreed [WTS] [JSN]
S5-221639 Rel-17 CR 28.552 performance measurements for ECS - Service Provisioning CR

revision of S5-221275

Samsung Electronics Benelux BV 28.522 16.0.0 CR#61 catB ECM Rel-17 S5-141-e

AI: 6.4.18

agreed [WTS] [JSN]
S5-221640 Discussion paper on Charging Solution for Roaming with Local Breakout discussion Vodafone Italia SpA S5-141-e

AI: 7.5.4

noted [WTS] [JSN]
S5-221641 New WID on 5G charging for additional roaming scenarios and actors WID new Vodafone Italia SpA, MATRIXX Software S5-141-e

AI: 7.5.4

agreed [WTS] [JSN]
S5-221642 CH agenda and time plan agenda

revision of S5-221008

CH Chair (MATRIXX Software) S5-141-e

AI: 7.1

approved [WTS] [JSN]
S5-221643 Draft TS 32.257 draft TR Intel Sweden AB EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

approved [WTS] [JSN]
S5-221644 Draft TR 28.822 draft TR Huawei FS_5GLAN_CH Rel-17 S5-141-e

AI: 7.5.1

approved [WTS] [JSN]
S5-221645 Draft TR 32.847 draft TR MATRIXX Software FS_NETSLICE_CH_Ph2 Rel-17 S5-141-e

AI: 7.5.2

approved [WTS] [JSN]
S5-221646 Draft TR 28.826 draft TR Ericsson LM FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

approved [WTS] [JSN]
S5-221647 Draft TR 28.827 draft TR Ericsson FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221648 Work Item Exception for Charging aspects of Edge Computing WI exception request Intel Sweden AB EDGE_CH S5-141-e

AI: 7.4.2

agreed [WTS] [JSN]
S5-221649 Rel-17 CR 32.291 Addition of IMS converged charging yaml CR

revision of S5-221311

Ericsson LM 32.291 17.1.0 CR#3751 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

agreed [WTS] [JSN]
S5-221650 Rel-17 CR 32.291 Addition of MMTel converged charging yaml CR

revision of S5-221313

Ericsson LM 32.291 17.1.0 CR#3761 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

agreed [WTS] [JSN]
S5-221651 Rel-17 CR 32.291 Addition of IMS converged charging announcement yaml CR

revision of S5-221315

Ericsson LM 32.291 17.1.0 CR#3771 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

agreed [WTS] [JSN]
S5-221652 Adding basic principles for 5G ProSe convergent charging CR

revision of S5-221397

CATT 32.277 17.0.0 CR#371 catB 5G_ProSe Rel-17 S5-141-e

AI: 7.4.4

agreed [WTS] [JSN]
S5-221653 Adding message flows for 5G ProSe Direct Discovery converged charging CR

revision of S5-221398

CATT 32.277 17.0.0 CR#381 catB 5G_ProSe Rel-17 S5-141-e

AI: 7.4.4

agreed [WTS] [JSN]
S5-221654 Rel-17 pCR 32.847 Conclusions for KI#3 pCR

revision of S5-221229

MATRIXX Software 32.847 1.0.0 FS_NETSLICE_CH_Ph2 Rel-17 S5-141-e

AI: 7.5.2

approved [WTS] [JSN]
S5-221655 New WID on Network Slice charging based on 5G data connectivity WID new

revision of S5-221231

MATRIXX Software Rel-17 S5-141-e

AI: 7.2

agreed [WTS] [JSN]
S5-221656 TR 28.827, Adding Conclusions pCR

revision of S5-221484

Vodafone Italia SpA,MATRIXX Software 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221657 LSout on Enhancement on Charging Identifier Uniqueness Mechanism LS out

LS To: CT4

revision of S5-221094

Huawei FS_5GLAN_CH Rel-17 S5-141-e

AI: 7.3

approved [WTS] [JSN]
S5-221658 pCR 32.257 Add principles and scenarios for edge enabling infrastructure resource usage charging pCR

revision of S5-221350

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

approved [WTS] [JSN]
S5-221659 pCR 32.257 Add charging information definition for edge enabling infrastructure resource usage charging pCR

revision of S5-221351

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

approved [WTS] [JSN]
S5-221660 pCR 32.257 Add principles and scenarios for edge application server deployment charging pCR

revision of S5-221352

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

approved [WTS] [JSN]
S5-221661 pCR 32.257 Add principles and scenarios for edge enabling services charging pCR

revision of S5-221355

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

approved [WTS] [JSN]
S5-221662 Update general charging principles for 5G ProSe CR

revision of S5-221396

CATT 32.277 17.0.0 CR#361 catB 5G_ProSe Rel-17 S5-141-e

AI: 7.4.4

agreed [WTS] [JSN]
S5-221663 pCR 32.257 Add charging information definition for edge application server deployment charging pCR

revision of S5-221354

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

approved [WTS] [JSN]
S5-221664 Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in charging procedure CR

revision of S5-221125

Huawei 32.255 17.4.0 CR#3611 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

agreed [WTS] [JSN]
S5-221665 Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in EPC interworking procedure CR

revision of S5-221126

Huawei 32.255 17.4.0 CR#3621 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

agreed [WTS] [JSN]
S5-221666 Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in home-routed roaming procedure CR

revision of S5-221127

Huawei 32.255 17.4.0 CR#3631 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

agreed [WTS] [JSN]
S5-221667 Rel-17 CR 32.255 Add charging information of 5GS CIoT CR

revision of S5-221128

Huawei 32.255 17.4.0 CR#3641 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

agreed [WTS] [JSN]
S5-221668 Rel-17 CR 32.255 Add charging requirements of 5GS CIoT CR

revision of S5-221129

Huawei 32.255 17.4.0 CR#3651 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

agreed [WTS] [JSN]
S5-221669 Rel-17 CR TS 32.291 Add charging information of 5GS CIoT CR

revision of S5-221130

Huawei 32.291 17.1.0 CR#3681 catB 5G_CIoT_CH Rel-17 S5-141-e

AI: 7.4.6

agreed [WTS] [JSN]
S5-221670 Work Item Exception for 5G Charging for Local breakout roaming of data connectivity WI exception request Vodafone DUMMY S5-141-e

AI: 7.5.4

agreed [WTS] [JSN]
S5-221671 Rel-17 CR TS 32.240 Charging architecture for Local Breakout CR Vodafone 32.24 17.4.0 CR#439 catB DUMMY Rel-17 S5-141-e

AI: 7.5.4

agreed [WTS] [JSN]
S5-221672 Revised SID on 5G roaming charging architecture for wholesale and retail scenarios SID revised Ericsson LM FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

agreed [WTS] [JSN]
S5-221673 Presentation of TR 28.827 for Information TS or TR cover Ericsson LM FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221674 Rel-17 CR 32.255 Introduction of Annex on Network Slice charging CR

revision of S5-221232

MATRIXX Software 32.255 17.4.0 CR#3661 catB DUMMY Rel-17 S5-141-e

AI: 7.2

agreed [WTS] [JSN]
S5-221675 Presentation of TS 32.257 for Information TS or TR cover Intel Sweden AB EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

approved [WTS] [JSN]
S5-221676 Update high level ProSe architecture CR

revision of S5-221395

CATT 32.277 17.0.0 CR#351 catF 5G_ProSe Rel-17 S5-141-e

AI: 7.4.4

agreed [WTS] [JSN]
S5-221677 Rel-16 CR 32.240 Correction on charging architecture for management domain CR

revision of S5-221020

Nokia, MATRIXX Software 32.24 16.4.0 CR#4351 catF 5GS_NSMCH Rel-16 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221678 Rel-17 CR 32.240 Correction on charging architecture for management domain CR

revision of S5-221028

Nokia, MATRIXX Software 32.24 17.4.0 CR#4361 catA 5GS_NSMCH Rel-17 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221679 Rel-17 pCR 28.827 Adding use case and solution for clause 7.6 pCR

revision of S5-221326

Ericsson LM 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221680 LS on 3GPP SA5 work on 5G network energy efficiency and energy saving LS out

LS To: GSMA, NGMN, ITU-T SG5, ETSI TC EE, ETSI ISG NFV

revision of S5-221014

Orange S5-141-e

AI: 5.3

approved [WTS] [JSN]
S5-221681 Rel-17 pCR 28.827 Corrections to clause 7.1 pCR

revision of S5-221321

Ericsson LM 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221682 Rel-17 pCR 28.826 Restructuring clauses 5.3 to 5.5 pCR

revision of S5-221316

Ericsson LM 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

approved [WTS] [JSN]
S5-221683 Rel-17 CR 32.291 Correcting response code 2xx CR

revision of S5-221304

Ericsson LM 32.291 17.1.0 CR#3691 catF TEI17 Rel-17 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221684 Rel-17 CR 32.291 Correcting response code 4xx CR

revision of S5-221306

Ericsson LM 32.291 17.1.0 CR#3711 catF TEI17 Rel-17 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221685 Rel-17 CR 32.255 Correcting charging rule base name CR

revision of S5-221308

Ericsson LM 32.255 17.4.1 CR#3671 catF TEI17 Rel-17 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221686 Rel-17 CR 32.298 Addition of IMS converged charging ASN.1 CR

revision of S5-221312

Ericsson LM 32.298 17.1.0 CR#8871 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

agreed [WTS] [JSN]
S5-221687 Rel-17 CR 32.298 Addition of MMTel converged charging ASN.1 CR

revision of S5-221314

Ericsson LM 32.298 17.1.0 CR#8881 catB 5GSIMSCH Rel-17 S5-141-e

AI: 7.4.1

agreed [WTS] [JSN]
S5-221688 pCR 32.257 Add charging information 5GS usage charging for edge enabling pCR

revision of S5-221348

Intel 32.257 0.2.0 EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

approved [WTS] [JSN]
S5-221689 Rel-17 CR 32.240 Addition of the 5G LAN-type service Description CR

revision of S5-221098

Huawei 32.24 17.4.0 CR#4371 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

agreed [WTS] [JSN]
S5-221705 Rel-17 CR 28.552 performance measurements for EES - EAS Discovery CR

revision of S5-221276

Samsung Electronics Benelux BV 28.552 17.5.0 CR#3491 catB ECM Rel-17 S5-141-e

AI: 6.4.18

agreed [WTS] [JSN]
S5-221706 Rel-17 CR 28.552 performance measurements for EES - EEC Registration CR

revision of S5-221278

Samsung Electronics Benelux BV 28.552 17.5.0 CR#3501 catB ECM Rel-17 S5-141-e

AI: 6.4.18

agreed [WTS] [JSN]
S5-221707 Rel-17 CR 28.552 performance measurements for EES - EAS Registration CR

revision of S5-221279

Samsung Electronics Benelux BV 28.552 17.5.0 CR#3511 catB ECM Rel-17 S5-141-e

AI: 6.4.18

agreed [WTS] [JSN]
S5-221708 pCR 28.538 EES LCM procedure pCR

revision of S5-221290

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221709 Latest draft TS 28.315 draft TS Ericsson PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221710 Rel-17 CR 28.531 Fixing Network slice and network slice subnet provisioning management service - profiles not convert to IOC - Stage 3 CR

revision of S5-221270

Samsung Electronics Benelux BV 28.531 17.2.0 CR#1041 catF eNETSLICE_PRO Rel-17 S5-141-e

AI: 6.4.21

agreed [WTS] [JSN]
S5-221711 WI Exception for eNETSLICE_PRO WI exception request

revision of S5-221245

Samsung Electronics Benelux BV NETSLICE-PRO_NS Rel-17 S5-141-e

AI: 6.4.21

agreed [WTS] [JSN]
S5-221712 pCR TS28.104 Add service experience analysis solution pCR

revision of S5-221142

Huawei 28.104 0.3.0 eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221713 pCR 28.824 Skeleton restructuring proposal pCR

revision of S5-221089

Huawei, Alibaba 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

approved [WTS] [JSN]
S5-221714 Key issue and solution on exposure without going through BSS pCR

revision of S5-221196

Alibaba Group 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

approved [WTS] [JSN]
S5-221715 pCR 28.819 update notified of new NF version scenario pCR

revision of S5-221215

Huawei 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221716 pCR 28.819 CI-CD process updates pCR

revision of S5-221213

Huawei 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221717 pCR 28.819 Update Scope pCR

revision of S5-221438

Lenovo, Motorola mobility, CMCC 28.819 0.4.0 FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221719 pCR 28.824 Clarification on access to exposed MnS pCR

revision of S5-221216

Huawei 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

approved [WTS] [JSN]
S5-221720 CR Rel-17 32.255 Add charging information for 5GS usage for Edge Computing CR

revision of S5-221349

Intel 32.255 17.4.0 CR#3681 catB EDGE_CH Rel-17 S5-141-e

AI: 7.4.2

agreed [WTS] [JSN]
S5-221721 Rel-17 CR 32.255 Add charging requirement to support NR RedCap CR

revision of S5-221447

China Mobile Com. Corporation 32.255 17.4.0 CR#3691 catB ARCH_NR_REDCAP Rel-17 S5-141-e

AI: 7.4.3

agreed [WTS] [JSN]
S5-221722 Work Item Exception for Charging Aspects of 5G LAN VN Group WI exception request Huawei 5GLAN_CH S5-141-e

AI: 7.4.5

agreed [WTS] [JSN]
S5-221723 Revised WID Charging aspects of 5G LAN VN Group WID revised Huawei 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

agreed [WTS] [JSN]
S5-221724 Rel-17 CR 32.255 Clarification on the 5G LAN type service charging CR

revision of S5-221100

Huawei 32.255 17.4.0 CR#3541 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

agreed [WTS] [JSN]
S5-221725 Rel-17 CR 32.291 Additional charging information for the 5G LAN communication CR

revision of S5-221102

Huawei 32.291 17.1.0 CR#3601 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

agreed [WTS] [JSN]
S5-221726 Rel-17 pCR 28.826 Adding use case for operator defined trigger pCR

revision of S5-221318

Ericsson LM 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

approved [WTS] [JSN]
S5-221727 Rel-17 pCR 28.822 Correction on the solution and conclusion for Topic 4 pCR

revision of S5-221096

Huawei 28.822 1.0.0 FS_5GLAN_CH Rel-17 S5-141-e

AI: 7.5.1

approved [WTS] [JSN]
S5-221728 Rel-17 CR 32.255 Additional charging information for the 5G LAN charging CR

revision of S5-221101

Huawei 32.255 17.4.0 CR#3551 catB 5GLAN_CH Rel-17 S5-141-e

AI: 7.4.5

agreed [WTS] [JSN]
S5-221729 Rel-17 pCR 28.827 Addition of the soultion for the Roaming Charging Profile pCR

revision of S5-221123

Huawei 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221730 Rel-16 CR 32.291 Extensibility Mechanisms for charging CR

revision of S5-221118

Huawei 32.291 16.10.0 CR#3661 catF TEI16 Rel-16 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221731 Rel-17 CR 32.291 Extensibility Mechanisms for charging CR

revision of S5-221119

Huawei 32.291 17.1.0 CR#3671 catA TEI16 Rel-17 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221732 Rel-17 pCR 28.827 Clarification on the Roaming Charging Profile pCR

revision of S5-221124

Huawei 28.827 0.3.0 FS_CHROAM Rel-17 S5-141-e

AI: 7.5.4

approved [WTS] [JSN]
S5-221733 Work Item Exception for Charging aspects of Architecture Enhancement for NR Reduced Capability Devices WI exception request China Mobile Com. Corporation ARCH_NR_REDCAP S5-141-e

AI: 7.4.3

agreed [WTS] [JSN]
S5-221734 Work Item Exception for Charging aspects of Proximity-based Services in 5GS WI exception request CATT 5G_ProSe S5-141-e

AI: 7.4.4

agreed [WTS] [JSN]
S5-221735 Revised WID Charging aspects of Architecture Enhancement for NR Reduced Capability Devices WID revised CMCC ARCH_NR_REDCAP Rel-17 S5-141-e

AI: 7.4.3

agreed [WTS] [JSN]
S5-221736 Rel-17 pCR 28.826 Adding use case for cancel failed event pCR

revision of S5-221320

Ericsson LM 28.826 0.2.0 FS_NCHF_Ph2 Rel-17 S5-141-e

AI: 7.5.3

approved [WTS] [JSN]
S5-221737 Rel-17 CR 32.291 Correct the Open API CR Huawei 32.291 17.1.0 CR#378 catF TEI17 Rel-17 S5-141-e

AI: 7.3

agreed [WTS] [JSN]
S5-221738 Revised work item on management of the enhanced tenant concept WID revised

revision of S5-221223

Huawei eMEMTANE Rel-17 S5-141-e

AI: 6.4.7

agreed [WTS] [JSN]
S5-221739 pCR 28.538 EES Performance assurance pCR

revision of S5-221637

Samsung Electronics Benelux BV 28.538 0.4.0 ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221740 SID revised was SP-210131 SID on network slice management capability exposure SID revised

revision of S5-221230

Alibaba Group FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

agreed [WTS] [JSN]
S5-221741 Latest draft TS 28.105 draft TS Intel eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221742 Add solution for product and service order procedures to clause 7 pCR

revision of S5-221423

Ericsson GmbH, Eurolab 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

approved [WTS] [JSN]
S5-221743 Update procedure and add solution for product on-boarding pCR

revision of S5-221430

Ericsson GmbH, Eurolab 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

approved [WTS] [JSN]
S5-221744 pCR 28.824 Remove EN in 5.4 pCR

revision of S5-221432

Lenovo, Motorola Mobility 28.824 0.4.0 FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

approved [WTS] [JSN]
S5-221745 DraftCR for FIMA TS 28.622 draftCR Nokia FIMA Rel-17 S5-141-e

AI: 6.4.

approved [WTS] [JSN]
S5-221746 Latest draft TS 28.557 draft TR Huawei OAM_NPN Rel-17 S5-141-e

AI: 6.4.1

approved [WTS] [JSN]
S5-221747 Latest draft TS 28.312 draft TS Huawei IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221748 Latest draft TS 28.104 draft TS Intel eMDAS Rel-17 S5-141-e

AI: 6.4.15

approved [WTS] [JSN]
S5-221749 Latest draft TS 28.314 draft TS Ericsson PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221750 Latest draft TS 28.316 draft TS Ericsson PACMAN Rel-17 S5-141-e

AI: 6.4.16

approved [WTS] [JSN]
S5-221751 Latest draft TS 28.538 draft TS Samsung ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221752 Latest draft TR 28.824 draft TR Alibaba FS_NSCE Rel-17 S5-141-e

AI: 6.5.2

approved [WTS] [JSN]
S5-221753 Latest draft TR 28.819 draft TR Lenovo FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

approved [WTS] [JSN]
S5-221754 pCR 28.312 ServiceDeploymentExpectation definition pCR

revision of S5-221384

Samsung Electronics Benelux BV 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221755 pCR TS 28.312 update clause 4.2.2 and clause 6.3.3 pCR

revision of S5-221261

AsiaInfo 28.312 0.7.0 IDMS_MN Rel-17 S5-141-e

AI: 6.4.9

approved [WTS] [JSN]
S5-221756 MRO additions for CHO and DAPS handover CR Ericsson France 28.313 17.3.0 CR#47 catC E_HOO Rel-17 S5-141-e

AI: 6.4.12

agreed [WTS] [JSN]
S5-221757 Rel-17 Input to DraftCR 28.622 Add file download control NRM fragment other

revision of S5-221330

Ericsson LM FIMA Rel-17 S5-141-e

AI: 6.4.17

approved [WTS] [JSN]
S5-221758 Rel-17 CR 28.623 Add file download NRM fragment (OpenAPI definitions) CR

revision of S5-221248

Nokia, Nokia Shanghai Bell 28.623 17.0.0 CR#1491 catB FIMA Rel-17 S5-141-e

AI: 6.4.17

agreed [WTS] [JSN]
S5-221759 Input to DraftCR Add file download NRM fragment, YANG other

revision of S5-221371

Ericsson LM FIMA S5-141-e

AI: 6.4.17

approved [WTS] [JSN]
S5-221760 CR 28.622 Add stage2 definition for file management CR Nokia 28.622 17.0.0 CR#147 catB FIMA Rel-17 S5-141-e

AI: 6.4.17

agreed [WTS] [JSN]
S5-221761 Exception sheet for FIMA WI exception request Nokia FIMA S5-141-e

AI: 6.4.17

withdrawn [WTS] [JSN]
S5-221762 Presentation sheet for approval to TS 28.538 TS or TR cover

revision of S5-221327

Samsung Electronics Benelux BV ECM Rel-17 S5-141-e

AI: 6.4.18

approved [WTS] [JSN]
S5-221763 Exception sheet for eQoE WI exception request Ericsson eQoE S5-141-e

AI: 6.4.5

agreed [WTS] [JSN]
S5-221764 Exception Sheet for IDMS_MN WI exception request Huawei IDMS_MN S5-141-e

AI: 6.4.9

agreed [WTS] [JSN]
S5-221765 Exception Sheet for eCOSLA WI exception request Ericsson eCOSLA S5-141-e

AI: 6.4.

agreed [WTS] [JSN]
S5-221766 Exception Sheet for MSAC WI exception request Nokia MSAC S5-141-e

AI: 6.4.

agreed [WTS] [JSN]
S5-221767 Revised SID for FS_CICDNS SID revised Lenovo, Motorola Mobility, CMCC FS_CICDNS Rel-17 S5-141-e

AI: 6.5.3

agreed [WTS] [JSN]

747 documents (1.1190071105957 seconds)