Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-221000 | Agenda | agenda | WG Chair |
S5-141-e AI: 2 |
approved | [WTS] [JSN] | |||
S5-221001 | Report from last SA5 meeting | report | MCC |
S5-141-e AI: 4.1 |
approved | [WTS] [JSN] | |||
S5-221002 | e-meeting process |
discussion revised to S5-221490 |
WG Chair |
S5-141-e AI: 5.1 |
revised | [WTS] [JSN] | |||
S5-221003 | Post e-meeting email approval status | other | WG Chair |
S5-141-e AI: 5.1 |
available | [WTS] [JSN] | |||
S5-221004 | OAM&P action list | other | WG Vice Chair (Huawei) |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221005 | agenda_with_Tdocs_sequence_proposal_OAM | agenda | WG Vice Chair (Huawei) |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221006 | OAM Exec Report | report | WG Vice Chair (Huawei) |
S5-141-e AI: 6.1 |
available | [WTS] [JSN] | |||
S5-221007 | OAM Chair notes and conclusions | report | WG Chair |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221008 | CH agenda and time plan |
agenda revised to S5-221642 |
CH Chair (MATRIXX Software) |
S5-141-e AI: 7.1 |
revised | [WTS] [JSN] | |||
S5-221009 | Charging exec report | report | WG Vice Chair (MATRIXX Software) |
S5-141-e AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-221010 | SA5 working procedures | other | WG Chair |
S5-141-e AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-221011 | Process for management of draft TS-TRs | other | WG Chair |
S5-141-e AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-221012 | SA5 meeting calendar | other | WG CHair |
S5-141-e AI: 5.4 |
noted | [WTS] [JSN] | |||
S5-221013 | Collection of useful endorsed document and external communication documents | discussion | WG Vice Chair (Huawei) |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221014 | LS on 3GPP SA5 work on 5G network energy efficiency and energy saving |
LS out LS To: GSMA, NGMN, ITU-T SG5, ETSI TC EE, ETSI ISG NFV revised to S5-221680 |
Orange |
S5-141-e AI: 5.3 |
revised | [WTS] [JSN] | |||
S5-221015 | Reply LS to SA on energy efficiency as guiding principle for new solutions |
LS out source LS: SP-211621 LS To: SA revised to S5-221501 |
Orange |
S5-141-e AI: 5.3 |
revised | [WTS] [JSN] | |||
S5-221016 | Reply LS on Recommendation ITU-T M.3381 |
LS out source LS: SG2-LS224 LS To: ITU-T SG2 revised to S5-221502 |
Intel, NEC, Orange |
S5-141-e AI: 5.3 |
revised | [WTS] [JSN] | |||
S5-221017 | Discussion on RACH NSA measurements |
discussion revised to S5-221537 |
Nokia Solutions & Networks (I) | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
revised | [WTS] [JSN] | |
S5-221018 | DP Deprecating attributes and IOCs | discussion | Ericsson Hungary Ltd | adNRM | Rel-17 |
S5-141-e AI: 6.3 |
noted | [WTS] [JSN] | |
S5-221019 | Deprecating attributes and IOC | CR | Ericsson Hungary Ltd | 32.156 16.4.0 CR#38 catB | TEI17 | Rel-17 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221020 | Rel-16 CR 32.240 Correction on charging architecture for management domain |
CR revised to S5-221677 |
Nokia, MATRIXX Software | 32.24 16.4.0 CR#435 catF | 5GS_NSMCH | Rel-16 |
S5-141-e AI: 7.3 |
revised | [WTS] [JSN] |
S5-221021 | Add lifecycle-status for attributes, data types and IOCs | CR | Ericsson Hungary Ltd | 32.16 17.3.0 CR#26 catB | TEI17 | Rel-17 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221022 | Discussion paper on Asynchronous interactions | discussion | Ericsson Hungary Ltd | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
noted | [WTS] [JSN] | |
S5-221023 | Asynchronous operation NRM additions |
CR revised to S5-221549 |
Ericsson Hungary Ltd | 28.622 17.0.0 CR#126 catC | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-221024 | Asynchronous operation NRM additions - YANG Stage 3 |
CR revised to S5-221550 |
Ericsson Hungary Ltd | 28.623 17.0.0 CR#144 catC | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-221025 | Specifying multivalue attributes |
CR revised to S5-221522 |
Ericsson Hungary Ltd | 32.156 16.4.0 CR#39 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
revised | [WTS] [JSN] |
S5-221026 | Alarm Record changes |
CR revised to S5-221521 |
Ericsson Hungary Ltd | 28.622 17.0.0 CR#127 catA | eNRM | Rel-17 |
S5-141-e AI: 6.3 |
revised | [WTS] [JSN] |
S5-221027 | Notification Subscription changes |
CR revised to S5-221519 |
Ericsson Hungary Ltd | 28.622 17.0.0 CR#128 catA | eNRM | Rel-17 |
S5-141-e AI: 6.3 |
revised | [WTS] [JSN] |
S5-221028 | Rel-17 CR 32.240 Correction on charging architecture for management domain |
CR revised to S5-221678 |
Nokia, MATRIXX Software | 32.24 17.4.0 CR#436 catA | 5GS_NSMCH | Rel-17 |
S5-141-e AI: 7.3 |
revised | [WTS] [JSN] |
S5-221029 | Fix stage3 definition for 5G_DDNMF | CR | CATT | 28.541 17.5.0 CR#641 catF | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221030 | Rel-17 CR 28.541 Update Figure L.2.1 and accompanying paragraph. | CR | TELEFONICA S.A. | 28.541 17.5.0 CR#642 catF | EMA5SLA | Rel-17 |
S5-141-e AI: 6.4.2 |
not pursued | [WTS] [JSN] |
S5-221031 | YANG corrections | CR | Ericsson Hungary Ltd | 28.541 17.5.0 CR#643 catF | adNRM | Rel-17 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221032 | Rel-16 CR 28.623 Structuring of TraceJob IOC and Clean up | CR | Nokia, Nokia Shanghai Bell | 28.623 16.10.0 CR#145 catF | 5GMDT | Rel-16 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221033 | pCR 28.557 Correct typo in clause 4.6.2 | pCR | TELEFONICA S.A. | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
withdrawn | [WTS] [JSN] |
S5-221034 | Fixing lists errors in AmfFunction-Single (stage 3) | CR | Nokia Germany | 28.541 17.5.0 CR#644 catF | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221035 | Rel-17 CR 28.541 Update RANSliceSubnetProfile attributes |
CR revised to S5-221531 |
TELEFONICA S.A. | 28.541 17.5.0 CR#645 catF | EMA5SLA | Rel-17 |
S5-141-e AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-221036 | Enhance 5G Core managed NF Profile NRM fragment (Stage 2) | CR | Nokia Germany | 28.541 17.5.0 CR#646 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
not pursued | [WTS] [JSN] |
S5-221037 | pCR 28.557 Correct typo in clause 4.6.2 | pCR | TELEFONICA S.A. | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-221038 | pCR 28.557 Add new NPN management related requirements |
pCR revised to S5-221526 |
TELEFONICA S.A. | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-221039 | Next step for FS_YANG | discussion | Ericsson Hungary Ltd | FS_YANG | Rel-17 |
S5-141-e AI: 6.5.1 |
endorsed | [WTS] [JSN] | |
S5-221040 | Data change notifications YANG-in-Rest format | CR | Ericsson Hungary Ltd | 28.532 16.10.0 CR#194 catC | TEI17 | Rel-17 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221041 | Adding Management Based Activation and Temporary stop and restart during RAN overload in NR | CR | Ericsson Limited | 28.405 17.0.0 CR#5 catB | eQoE | Rel-17 |
S5-141-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
S5-221042 | Adding Signalling Based Activation for NR |
CR revised to S5-221557 |
Ericsson Limited | 28.405 17.0.0 CR#6 catB | eQoE | Rel-17 |
S5-141-e AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-221043 | Handling of QoE measurement collection at handover in NR | CR | Ericsson Limited | 28.405 17.0.0 CR#7 catB | eQoE | Rel-17 |
S5-141-e AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-221044 | Adding VR measurements | CR | Ericsson Limited | 28.404 17.0.0 CR#6 catB | eQoE | Rel-17 |
S5-141-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
S5-221045 | Enhance 5G Core managed NF Profile NRM fragment (Stage 3) | CR | Nokia Germany | 28.541 17.5.0 CR#647 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
not pursued | [WTS] [JSN] |
S5-221046 | Including individual PM, KPI, trace and QoE statistics and predictions as additional MDA types |
pCR revised to S5-221602 |
Nokia Germany | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221047 | pCR 28.314 PnC Concepts and Requirements - remove Editor note | pCR | Oy LM Ericsson AB | 28.314 0.4.0 | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] |
S5-221048 | Editorial on the definition of AssuranceClosedControlLoop |
CR revised to S5-221586 |
Nokia Germany | 28.536 17.1.0 CR#37 catD | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
revised | [WTS] [JSN] |
S5-221049 | pCR 28.314 PnC Concepts and Requirements - updates from ETSI review | pCR | Oy LM Ericsson AB | 28.314 0.4.0 | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] |
S5-221050 | pCR 28.315 PnC Procedure flows - remove Editor note | pCR | Oy LM Ericsson AB | 28.315 0.3.0 | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] |
S5-221051 | pCR 28.315 PnC Procedure flows - updates from ETSI review | pCR | Oy LM Ericsson AB | 28.315 0.3.0 | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] |
S5-221052 | pCR 28.316 PnC Data formats - DHCP Replies | pCR | Oy LM Ericsson AB | 28.316 0.2.0 | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] |
S5-221053 | pCR 28.316 PnC Data formats - FQDN | pCR | Oy LM Ericsson AB | 28.316 0.2.0 | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] |
S5-221054 | pCR 28.316 PnC Data formats - updates from ETSI review | pCR | Oy LM Ericsson AB | 28.316 0.2.0 | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] |
S5-221055 | Presentation of Spec TS28.314 Version 1.0.0 to TSG and WG | TS or TR cover | Oy LM Ericsson AB | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] | |
S5-221056 | Presentation of Spec TS28.315 Version 1.0.0 to TSG and WG | TS or TR cover | Oy LM Ericsson AB | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] | |
S5-221057 | Presentation of Spec TS28.316 Version 1.0.0 to TSG and WG | TS or TR cover | Oy LM Ericsson AB | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] | |
S5-221058 | Add Space Division Multiplexing PRB Usage for MIMO cell |
CR revised to S5-221538 |
CMCC, Huawei, ZTE | 28.552 17.5.0 CR#341 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
revised | [WTS] [JSN] |
S5-221059 | Forge working procedure change in SA5 Working Procedures |
other revised to S5-221497 |
Nokia, Nokia Shanghai Bell |
S5-141-e AI: 5.1 |
revised | [WTS] [JSN] | |||
S5-221060 | Rel-17 network slice isolation | CR | Nokia, Nokia Shanghai Bell | 28.541 17.5.0 CR#648 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
not pursued | [WTS] [JSN] |
S5-221061 | TS28.540 Update the requirements for management enhancement of network slice and network slice subnet | CR | Nokia, Nokia Shanghai Bell | 28.54 17.2.0 CR#17 catB | EMA5SLA | Rel-17 |
S5-141-e AI: 6.4.2 |
not pursued | [WTS] [JSN] |
S5-221062 | DP for New Rel-18 SID measurement data collection to support RAN intelligence_x00B_ | discussion | Intel Corporation (UK) Ltd | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221063 | New SID Study on measurement data collection to support RAN intelligence | SID new | Intel Corporation (UK) Ltd, Verizon, AT&T, CMCC | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221064 | Notification Subscription changes |
CR revised to S5-221518 |
Ericsson Hungary Ltd | 28.622 16.10.0 CR#129 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
revised | [WTS] [JSN] |
S5-221065 | Alarm Record changes |
CR revised to S5-221520 |
Ericsson Hungary Ltd | 28.622 16.10.0 CR#130 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
revised | [WTS] [JSN] |
S5-221066 | pCR 28.538 add fault supervision use cases | pCR | Intel | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221067 | pCR 28.538 add fault supervision procedures |
pCR revised to S5-221624 |
Intel | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221068 | pCR 28.538 add provisioning use cases |
pCR revised to S5-221625 |
Intel | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221069 | pCR 28.538 add provisioning procedures |
pCR revised to S5-221626 |
Intel | 28.538 0.4.0 | IDMS_MN, ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221070 | pCR 28.538 add relevent NRM changes to support ECM use cases |
pCR revised to S5-221628 |
Intel | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221071 | Rel-17 CR 28.532 add object class to FS subscription | CR | Intel | 28.532 16.10.0 CR#195 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
not pursued | [WTS] [JSN] |
S5-221072 | Rel-17 CR 28.541 Correct NRM fragment for DMRO Management | CR | Intel | 28.541 17.5.0 CR#649 catF | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
agreed | [WTS] [JSN] |
S5-221073 | Rel-17 CR 28.541 Add Stage 2 solutions to support ECM |
CR revised to S5-221627 |
Intel | 28.541 17.5.0 CR#650 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221074 | Rel-17 CR 28.313 Add information in the PCI configuration notification |
CR revised to S5-221591 |
Intel | 28.313 17.3.0 CR#45 catB | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
revised | [WTS] [JSN] |
S5-221075 | Rel-17 CR 28.313 Add information in the C-SON notification |
CR revised to S5-221592 |
Intel | 28.313 17.3.0 CR#46 catB | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
revised | [WTS] [JSN] |
S5-221076 | CR Rel-17 28.622 Enhance NRM with geographical information supporting MDA |
CR revised to S5-221604 |
Intel | 28.622 17.0.0 CR#131 catB | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221077 | CR Rel-17 28.623 Enhance NRM with geographical information supporting MDA |
CR revised to S5-221605 |
Intel | 28.623 17.0.0 CR#146 catB | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221078 | pCR TS 28.312 Add feasibility check to the procedures for intent management |
pCR revised to S5-221584 |
China Mobile Com. Corporation | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-221079 | Reply LS on slicing management aspects in relation to SEAL |
LS out LS is reply to S6-210709 LS To: SA6 revised to S5-221548 |
Huawei | Rel-17 |
S5-141-e AI: 5.3 |
revised | [WTS] [JSN] | ||
S5-221080 | Rel-17 CR 28.541 Update energy efficiency attribute |
CR revised to S5-221532 |
Huawei | 28.541 17.5.0 CR#651 catF | EMA5SLA | Rel-17 |
S5-141-e AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-221081 | pCR 28.557 fixing leftover of updating names for management modes of NPN | pCR | Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-221082 | pCR 28.557 Solution for management of SNPN |
pCR revised to S5-221527 |
Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-221083 | pCR 28.557 Update solution for NPN provisioning by a network slice of a PLMN |
pCR revised to S5-221528 |
Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-221084 | pCR 28.557 Solution for exposure of management capability of PNI-NPN | pCR | Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-221085 | pCR 28.557 Solution for collecting UE related data |
pCR revised to S5-221529 |
Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-221086 | pCR 28.557 Use case of collecting UE related data |
pCR revised to S5-221530 |
Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
revised | [WTS] [JSN] |
S5-221087 | pCR 28.557 Rapporteur proposal | pCR | Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-221088 | Presentation sheet of TS 28.557 for Approval | TS or TR cover | Huawei | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] | |
S5-221089 | pCR 28.824 Skeleton restructuring proposal |
pCR revised to S5-221713 |
Huawei, Alibaba | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-221090 | pCR 28.824 Possible solution for exposure of network slice as a service | pCR | Huawei | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221091 | Rel-17 CR 28.533 Update on management capability exposure governance | CR | Huawei | 28.533 17.1.0 CR#96 catC | TEI17 | Rel-17 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221092 | Rel-17 CR 28.533 Add EGMF services to support MnS exposure | CR | Huawei | 28.533 17.1.0 CR#97 catC | NETSLICE | Rel-17 |
S5-141-e AI: 6.3 |
withdrawn | [WTS] [JSN] |
S5-221093 | Presentation of TR 28.822 for Approval | TS or TR cover | Huawei | FS_5GLAN_CH | Rel-17 |
S5-141-e AI: 7.5.1 |
approved | [WTS] [JSN] | |
S5-221094 | LSout on Enhancement on Charging Identifier Uniqueness Mechanism |
LS out LS To: CT4 revised to S5-221657 |
Huawei | FS_5GLAN_CH | Rel-17 |
S5-141-e AI: 7.3 |
revised | [WTS] [JSN] | |
S5-221095 | Rel-17 pCR 28.822 Remove the editor‘s note for topic 4 | pCR | Huawei | 28.822 1.0.0 | FS_5GLAN_CH | Rel-17 |
S5-141-e AI: 7.5.1 |
approved | [WTS] [JSN] |
S5-221096 | Rel-17 pCR 28.822 Correction on the solution and conclusion for Topic 4 |
pCR revised to S5-221727 |
Huawei | 28.822 1.0.0 | FS_5GLAN_CH | Rel-17 |
S5-141-e AI: 7.5.1 |
revised | [WTS] [JSN] |
S5-221097 | Rel-17 pCR 28.822 Correction on the Recommendation | pCR | Huawei | 28.822 1.0.0 | FS_5GLAN_CH | Rel-17 |
S5-141-e AI: 7.5.1 |
approved | [WTS] [JSN] |
S5-221098 | Rel-17 CR 32.240 Addition of the 5G LAN-type service Description |
CR revised to S5-221689 |
Huawei | 32.24 17.4.0 CR#437 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
revised | [WTS] [JSN] |
S5-221099 | Rel-17 CR 32.240 Addition of the 5G VN group management Charging | CR | Huawei | 32.24 17.4.0 CR#438 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
not pursued | [WTS] [JSN] |
S5-221100 | Rel-17 CR 32.255 Clarification on the 5G LAN type service charging |
CR revised to S5-221724 |
Huawei | 32.255 17.4.0 CR#354 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
revised | [WTS] [JSN] |
S5-221101 | Rel-17 CR 32.255 Additional charging information for the 5G LAN charging |
CR revised to S5-221728 |
Huawei | 32.255 17.4.0 CR#355 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
revised | [WTS] [JSN] |
S5-221102 | Rel-17 CR 32.291 Additional charging information for the 5G LAN communication |
CR revised to S5-221725 |
Huawei | 32.291 17.1.0 CR#360 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
revised | [WTS] [JSN] |
S5-221103 | Rel-17 CR 32.298 Additional charging information for the 5G LAN communication | CR | Huawei | 32.298 17.1.0 CR#882 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
not pursued | [WTS] [JSN] |
S5-221104 | Rel-16 CR 32.255 Correction on the UPF Id used for QBC | CR | Huawei | 32.255 16.11.0 CR#356 catF | TEI16, 5GS_Ph1-DCH | Rel-16 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221105 | Rel-17 CR 32.255 Correction on the UPF Id used for QBC | CR | Huawei | 32.255 17.4.0 CR#357 catA | TEI16, 5GS_Ph1-DCH | Rel-17 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221106 | Rel-16 CR 32.291 Correction on the UPF Id used for QBC | CR | Huawei | 32.291 16.10.0 CR#361 catF | TEI16, 5GS_Ph1-DCH | Rel-16 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221107 | Rel-17 CR 32.291 Correction on the UPF Id used for QBC | CR | Huawei | 32.291 17.1.0 CR#362 catA | TEI16, 5GS_Ph1-DCH | Rel-17 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221108 | Rel-16 CR 32.298 Correction on the UPF Id used for QBC | CR | Huawei | 32.298 16.10.0 CR#883 catF | TEI16, 5GS_Ph1-DCH | Rel-16 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221109 | Rel-17 CR 32.298 Correction on the UPF Id used for QBC | CR | Huawei | 32.298 17.1.0 CR#884 catA | TEI16, 5GS_Ph1-DCH | Rel-17 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221110 | Rel-16 CR 32.255 Correction on the Charging Identifier Uniqueness | CR | Huawei | 32.255 16.11.0 CR#358 catF | 5GIEPC_CH | Rel-16 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221111 | Rel-17 CR 32.255 Correction on the Charging Identifier Uniqueness | CR | Huawei | 32.255 17.4.0 CR#359 catA | 5GIEPC_CH | Rel-17 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221112 | Rel-16 CR 32.291 Correction on the Charging Identifier Uniqueness | CR | Huawei | 32.291 16.10.0 CR#363 catF | 5GIEPC_CH | Rel-16 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221113 | Rel-17 CR 32.291 Correction on the Charging Identifier Uniqueness | CR | Huawei | 32.291 17.1.0 CR#364 catA | 5GIEPC_CH | Rel-17 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221114 | Rel-16 CR 32.298 Correction on the Charging Identifier Uniqueness | CR | Huawei | 32.298 16.10.0 CR#885 catF | 5GIEPC_CH | Rel-16 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221115 | Rel-17 CR 32.298 Correction on the Charging Identifier Uniqueness | CR | Huawei | 32.298 17.1.0 CR#886 catA | 5GIEPC_CH | Rel-17 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221116 | Rel-17 CR 32.255 Additional Supported fields for the QoS Mornitoring Report | CR | Huawei | 32.255 17.4.0 CR#360 catF | 5GIEPC_CH | Rel-17 |
S5-141-e AI: 7.3 |
merged | [WTS] [JSN] |
S5-221117 | Rel-17 CR 32.291 Addition of the Supported Feature for URLLC | CR | Huawei | 32.291 17.1.0 CR#365 catF | 5G_URLLC | Rel-17 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221118 | Rel-16 CR 32.291 Extensibility Mechanisms for charging |
CR revised to S5-221730 |
Huawei | 32.291 16.10.0 CR#366 catF | TEI16 | Rel-16 |
S5-141-e AI: 7.3 |
revised | [WTS] [JSN] |
S5-221119 | Rel-17 CR 32.291 Extensibility Mechanisms for charging |
CR revised to S5-221731 |
Huawei | 32.291 17.1.0 CR#367 catA | TEI16 | Rel-17 |
S5-141-e AI: 7.3 |
revised | [WTS] [JSN] |
S5-221120 | Rel-17 pCR 28.826 Update the References | pCR | Huawei | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-221121 | Rel-17 pCR 28.826 Add the solution for Non-blocking Mode Enhancement | pCR | Huawei | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
noted | [WTS] [JSN] |
S5-221122 | Rel-17 pCR 28.827 Editorial Correction on the Figures | pCR | Huawei | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-221123 | Rel-17 pCR 28.827 Addition of the soultion for the Roaming Charging Profile |
pCR revised to S5-221729 |
Huawei | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
revised | [WTS] [JSN] |
S5-221124 | Rel-17 pCR 28.827 Clarification on the Roaming Charging Profile |
pCR revised to S5-221732 |
Huawei | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
revised | [WTS] [JSN] |
S5-221125 | Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in charging procedure |
CR revised to S5-221664 |
Huawei | 32.255 17.4.0 CR#361 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
revised | [WTS] [JSN] |
S5-221126 | Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in EPC interworking procedure |
CR revised to S5-221665 |
Huawei | 32.255 17.4.0 CR#362 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
revised | [WTS] [JSN] |
S5-221127 | Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in home-routed roaming procedure |
CR revised to S5-221666 |
Huawei | 32.255 17.4.0 CR#363 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
revised | [WTS] [JSN] |
S5-221128 | Rel-17 CR 32.255 Add charging information of 5GS CIoT |
CR revised to S5-221667 |
Huawei | 32.255 17.4.0 CR#364 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
revised | [WTS] [JSN] |
S5-221129 | Rel-17 CR 32.255 Add charging requirements of 5GS CIoT |
CR revised to S5-221668 |
Huawei | 32.255 17.4.0 CR#365 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
revised | [WTS] [JSN] |
S5-221130 | Rel-17 CR TS 32.291 Add charging information of 5GS CIoT |
CR revised to S5-221669 |
Huawei | 32.291 17.1.0 CR#368 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
revised | [WTS] [JSN] |
S5-221131 | pCR TS 28.312 Rapporteur clean up |
pCR revised to S5-221585 |
Huawei | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-221132 | pCR TS 28.312 Align the description for general concept of intent content |
pCR revised to S5-221580 |
Huawei,Nokia, Deutsche Telekom,AsiaInfo | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-221133 | pCR TS 28.312 Update intent information model |
pCR revised to S5-221581 |
Huawei, China Mobile, China Unicom, Nokia, Deutsche Telekom,AsiaInfo | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-221134 | pCR TS 28.312 Update RadioNetworkExpectation |
pCR revised to S5-221575 |
Huawei, China Mobile, China Unicom,, Deutsche Telekom | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-221135 | pCR TS 28.312 Clean up on procedures |
pCR revised to S5-221582 |
Huawei, Deutsche Telekom | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-221136 | Rel-17 CR TS 28.541 Alignment on NR NRM for MOCN network sharing |
CR revised to S5-221599 |
Huawei,Orange,China Mobile,China Unicom,China Telecom, Deutsche Telekom,Ericsson,Telefonica | 28.541 17.5.0 CR#652 catF | MANS | Rel-17 |
S5-141-e AI: 6.4.14 |
revised | [WTS] [JSN] |
S5-221137 | Rel-17 CR TS 32.130 Clean up on concept and business level requirements | CR | Huawei, China Unicom,China Telecom | 32.13 17.3.0 CR#17 catF | MANS | Rel-17 |
S5-141-e AI: 6.4.14 |
agreed | [WTS] [JSN] |
S5-221138 | Rel-17 CR TS 32.130 Add missing use case and requirements for radio resources partitioning between POPs | CR | Huawei, China Unicom,China Telecom | 32.13 17.3.0 CR#18 catB | MANS | Rel-17 |
S5-141-e AI: 6.4.14 |
agreed | [WTS] [JSN] |
S5-221139 | Rel-17 CR TS 32.130 Add solution description for the requirements for the management of the shared NG-RAN NE(s) in MOCN network sharing scenario |
CR revised to S5-221600 |
Huawei,Orange,China Mobile, China Unicom,China Telecom, Deutsche Telekom,Ericsson,Telefonica | 32.13 17.3.0 CR#19 catB | MANS | Rel-17 |
S5-141-e AI: 6.4.14 |
revised | [WTS] [JSN] |
S5-221140 | pCR TS28.104 Add E2E latency analysis solution |
pCR revised to S5-221609 |
Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221141 | pCR TS 28.104 add E2E latency analysis solution - stage3 | pCR | Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221142 | pCR TS28.104 Add service experience analysis solution |
pCR revised to S5-221712 |
Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221143 | pCR TS 28.104 add service experience analysis solution -stage3 | pCR | Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221144 | pCR TS28.104 Add network slice throughput analysis solution |
pCR revised to S5-221610 |
Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221145 | pCR TS 28.104 add network slice throughput analysis solution - stage3 | pCR | Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221146 | pCR TS28.104 Add network slice load analysis solution |
pCR revised to S5-221611 |
Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221147 | pCR TS 28.104 add network slice load analysis solution - stage3 | pCR | Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221148 | Rel-17 CR TS 32.422 Correct the value of Report Interval in NR for alignment |
CR revised to S5-221523 |
China Telecom Corporation Ltd. | 32.422 17.5.0 CR#384 catA | TEI16 | Rel-17 |
S5-141-e AI: 6.3 |
revised | [WTS] [JSN] |
S5-221149 | Revised WID for additional NRM features | WID revised | Nokia, Nokia Shanghai Bell | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
noted | [WTS] [JSN] | |
S5-221150 | Rel-17 CR TS 28.541 Add feasibility check NRM fragment |
CR revision of S5-216205 |
Huawei,China Unicom, Deutsche Telekom,China Mobile | 28.541 17.5.0 CR#5363 catB | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221151 | Rel-17 CR TS 28.531 Update procedure of reservation and checking feasibility of network slice subnet |
CR revision of S5-216206 |
Huawei,China Unicom,Deutsche Telekom,China Mobile | 28.531 17.2.0 CR#703 catB | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221152 | Rel-17 CR TS 28.531 Update procedure of network slice subnet instance allocation | CR | Huawei | 28.531 17.2.0 CR#99 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
agreed | [WTS] [JSN] |
S5-221153 | pCR TS 28.312 add stage3 for intent NRM | pCR | Huawei | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-221154 | Presentation sheet of TS 28.312 for SA Information and Approval |
other revised to S5-221583 |
Huawei | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
revised | [WTS] [JSN] | |
S5-221155 | Rel-15 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA |
CR revision of S5-216580 |
Huawei | 28.658 15.6.0 CR#582 catF | NETSLICE-5GNRM | Rel-15 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221156 | Rel-16 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA |
CR revision of S5-216581 |
Huawei | 28.658 16.4.0 CR#592 catA | NETSLICE-5GNRM | Rel-16 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221157 | Rel-17 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA | CR | Huawei | 28.658 17.0.0 CR#60 catA | NETSLICE-5GNRM | Rel-17 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221158 | Rel-15 CR TS 28.662 Update Generic RAN NRM to be applicable for SBMA |
CR revision of S5-216618 |
Huawei | 28.662 15.3.0 CR#122 catF | NETSLICE-5GNRM | Rel-15 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221159 | Rel-16 CR TS 28.662 Update Generic RAN NRM to be applicable for SBMA |
CR revision of S5-216619 |
Huawei | 28.662 16.0.0 CR#132 catA | NETSLICE-5GNRM | Rel-16 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221160 | Rel-17 CR TS 28.622 Add condition information for threshold monitoring |
CR revision of S5-216343 |
Huawei | 28.622 17.0.0 CR#1192 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
not pursued | [WTS] [JSN] |
S5-221161 | Rel-17 CR TS 28.541 Add tenant IOC to support multiple tenant environment |
CR revision of S5-216228 revised to S5-221558 |
Huawei | 28.541 17.5.0 CR#5383 catB | eMEMTANE | Rel-17 |
S5-141-e AI: 6.4.7 |
revised | [WTS] [JSN] |
S5-221162 | Rel-17 CR TS 28.659 Provide YAML solution set for EUTRAN NRM |
CR revision of S5-216164 |
Huawei | 28.659 16.2.0 CR#392 catB | NSA_SBMA | Rel-17 |
S5-141-e AI: 6.4.19 |
not pursued | [WTS] [JSN] |
S5-221163 | Rel-17 CR TS 28.663 Provide YAML solution set for RAN NRM |
CR revision of S5-216165 |
Huawei | 28.663 16.0.0 CR#212 catB | NSA_SBMA | Rel-17 |
S5-141-e AI: 6.4.19 |
not pursued | [WTS] [JSN] |
S5-221164 | CR TS 28.622 Add description of the corresponding IOCs | CR | Huawei Technologies (Korea) | 28.622 17.0.0 CR#132 catF | NSA_SBMA | Rel-17 |
S5-141-e AI: 6.4.19 |
not pursued | [WTS] [JSN] |
S5-221165 | CR Rel-17 TS 28.533 Add 5G specification information |
CR revised to S5-221503 |
Huawei Technologies (Korea) | 28.533 17.1.0 CR#98 catF | TEI17 | Rel-17 |
S5-141-e AI: 6.1 |
revised | [WTS] [JSN] |
S5-221166 | Add MDT reporting for NR | CR | Ericsson LM | 32.422 16.8.0 CR#385 catB | e_5GMDT | Rel-16 |
S5-141-e AI: 6.4.3 |
not pursued | [WTS] [JSN] |
S5-221167 | CR Rel-16 TS 32.103 Remove 5G specification information |
CR revised to S5-221504 |
Huawei Technologies (Korea) | 32.103 16.2.0 CR#33 catF | TEI16 | Rel-16 |
S5-141-e AI: 6.1 |
revised | [WTS] [JSN] |
S5-221168 | Add MDT reporting for NR |
CR revised to S5-221534 |
Ericsson LM | 32.422 17.5.0 CR#386 catB | e_5GMDT | Rel-17 |
S5-141-e AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-221169 | Rel-17 CR TS 32.130 Add administrative management capability requirements | CR | ZTE Corporation, China Unicom | 32.13 17.3.0 CR#20 catB | MANS | Rel-17 |
S5-141-e AI: 6.4.14 |
agreed | [WTS] [JSN] |
S5-221170 | Add MDT signalling activation and deactivation mechanisms in a split architecture for NR |
CR revised to S5-221535 |
Ericsson LM | 32.422 17.5.0 CR#387 catB | e_5GMDT | Rel-17 |
S5-141-e AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-221171 | Rel-17 CR TS 28.541 Add administrativeState attribute in OperatorNRCellDU |
CR revised to S5-221601 |
ZTE Corporation, China Unicom | 28.541 17.5.0 CR#653 catB | MANS | Rel-17 |
S5-141-e AI: 6.4.14 |
revised | [WTS] [JSN] |
S5-221172 | Add MDT management activation and deactivation mechanism in the case of split architecture for NR |
CR revised to S5-221536 |
Ericsson LM | 32.422 17.5.0 CR#388 catB | e_5GMDT | Rel-17 |
S5-141-e AI: 6.4.3 |
revised | [WTS] [JSN] |
S5-221173 | Rel-18 time plan proposal for OAM | discussion | SA5 Vice chair (Huawei),SA5 Chair |
S5-141-e AI: 6.1 |
endorsed | [WTS] [JSN] | |||
S5-221174 | Rel-16 CR TS 28.541 Remove incorrect reference to 22.104 | CR | ZTE Corporation | 28.541 16.11.0 CR#654 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221175 | Rel-17 CR TS 28.541 Remove incorrect reference to 22.104 | CR | ZTE Corporation | 28.541 17.5.0 CR#655 catA | eNRM | Rel-17 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221176 | Rel-16 CR TS 28.541 Change the datatype of RRMPolicyRatio to real | CR | ZTE Corporation, China Mobile, China Telecom | 28.541 16.11.0 CR#656 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221177 | Rel-17 CR TS 28.552 Remove the number of failed conditional handover executions which is not implementable | CR | China Telecom Corporation Ltd., ZTE | 28.552 17.5.0 CR#342 catF | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221178 | Rel-17 CR TS 28.541 Change the datatype of RRMPolicyRatio to real | CR | ZTE Corporation, China Mobile, China Telecom | 28.541 17.5.0 CR#657 catA | eNRM | Rel-17 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221179 | New SID on Network Slice Management Capability Exposure Phase 2 | SID new | Alibaba Group | Rel-18 |
S5-141-e AI: 6.2 |
withdrawn | [WTS] [JSN] | ||
S5-221180 | NRM enhacements for SMFFunction |
CR revised to S5-221555 |
Nokia Germany | 28.541 17.5.0 CR#658 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-221181 | New Rel-18 SID on Closed control loop for autonomous network management | SID new | ZTE Corporation |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | |||
S5-221182 | pCR TS 28.104 add Energy saving analytics output solution --stage2 | pCR | Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
merged | [WTS] [JSN] |
S5-221183 | pCR TS 28.104 add coverage issue analytics output area definition--stage2 |
pCR revised to S5-221606 |
Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221184 | pCR TS 28.104 add output stage3 for Energy saving analytics and coverage issue analytics | pCR | Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221185 | pCR TS 28.104 add AnalticsOutputFilters of coverage issue analysis stage2 | pCR | Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221186 | pCR TS 28.104 add reporting method | pCR | Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221187 | pCR TS 28.104 add report control NRM stage3 | pCR | Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221188 | pCR TS 28.104 add MDA analysis request and report generic workflow | pCR | Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221189 | pCR TS 28.104 add MDA related service components |
pCR revised to S5-221621 |
Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221190 | pCR TS28.104 Add the requirements for ML model training for MDA |
pCR revised to S5-221614 |
Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221191 | Rel-17 CR 28.541 Add C-SON CCO NRM model stage2 |
CR revised to S5-221594 |
Huawei | 28.541 17.5.0 CR#659 catB | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
revised | [WTS] [JSN] |
S5-221192 | Rel-17 CR 28.541 Add C-SON CCO NRM model stage3 |
CR revised to S5-221593 |
Huawei | 28.541 17.5.0 CR#660 catB | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
revised | [WTS] [JSN] |
S5-221193 | Rel-17 CR TS 28.552 Add one more trigger point to the Number of failed DAPS handover preparations performance measurement | CR | China Telecom Corporation Ltd., ZTE | 28.552 17.5.0 CR#343 catF | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221194 | Preparation of checking the Rel-17 OAM work progress |
discussion revised to S5-221505 |
SA5 Vice chair (Huawei) |
S5-141-e AI: 6.1 |
revised | [WTS] [JSN] | |||
S5-221195 | New WID on Network Slice Management Capability Exposure |
WID new revised to S5-221552 |
Alibaba Group | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221196 | Key issue and solution on exposure without going through BSS |
pCR revised to S5-221714 |
Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-221197 | Fixing the "S" qualifier |
CR revised to S5-221587 |
Nokia Germany | 28.536 17.1.0 CR#38 catD | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
revised | [WTS] [JSN] |
S5-221198 | Solution on the relation to other SA5 work/study item | pCR | Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221199 | Resolving the acquisition of operator’s MIB EN |
pCR revised to S5-221569 |
Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-221200 | Resolving the EN regarding discovery system | pCR | Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221201 | New SID on Fault Supervision Evolution | SID new | China Mobile Research Inst.; HUAWEI |
S5-141-e AI: 6.2 |
withdrawn | [WTS] [JSN] | |||
S5-221202 | Resolving the exposure related EN | pCR | Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221203 | New SID on Fault Supervision Evolution |
SID new revised to S5-221553 |
China Mobile Com. Corporation;HUAWEI |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | |||
S5-221204 | New SID on Management Aspect Enhancement of 5G MOCN Network Sharing |
SID new revised to S5-221353 |
China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221205 | Rel-17 CR 28.541 Add containment name in IMS SBA nodes | CR | Huawei | 28.541 17.5.0 CR#661 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
not pursued | [WTS] [JSN] |
S5-221206 | Rel-17 CR 28.541 Add N70 N71 stage 3 | CR | Huawei | 28.541 17.5.0 CR#662 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
not pursued | [WTS] [JSN] |
S5-221207 | Rel17 CR 28.541 CN related informtion in EP_Transport | CR | Huawei | 28.541 17.5.0 CR#663 catF | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
not pursued | [WTS] [JSN] |
S5-221208 | Discussion on solutions for discovery of management services in 5G | discussion | Huawei | 5GDMS | Rel-17 |
S5-141-e AI: 6.4.13 |
noted | [WTS] [JSN] | |
S5-221209 | Rel-17 CR 28.622 Add support for discovery of managed entities |
CR revised to S5-221597 |
Huawei | 28.622 17.0.0 CR#133 catB | 5GDMS | Rel-17 |
S5-141-e AI: 6.4.13 |
revised | [WTS] [JSN] |
S5-221210 | Rel-17 CR 28.623 Add support for discovery of managed entities |
CR revised to S5-221598 |
Huawei | 28.623 17.0.0 CR#147 catB | 5GDMS | Rel-17 |
S5-141-e AI: 6.4.13 |
revised | [WTS] [JSN] |
S5-221211 | pCR 28.819 Add use case for test of NF utilizing slicing | pCR | Huawei, Lenovo | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221212 | pCR 28.819 Add use case for network function health analysis | pCR | Huawei, Lenovo | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221213 | pCR 28.819 CI-CD process updates |
pCR revised to S5-221716 |
Huawei | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
revised | [WTS] [JSN] |
S5-221214 | pCR 28.819 clarify feedback to vendor scenario | pCR | Huawei | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221215 | pCR 28.819 update notified of new NF version scenario |
pCR revised to S5-221715 |
Huawei | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
revised | [WTS] [JSN] |
S5-221216 | pCR 28.824 Clarification on access to exposed MnS |
pCR revised to S5-221719 |
Huawei | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-221217 | pCR 28.104 Add description of coordinated analysis | pCR | Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221218 | pCR 28.104 Requirements cleanup | pCR | Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221219 | Rel-17 PCR TS 28.104 Add Alarm analytics solution-stage 2 | pCR | Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221220 | Rel-17 PCR TS 28.104 Add Alarm analytics solution-stage 3 | pCR | Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221221 | Rel-17 CR 28,541 Update SericeProfile and SliceProfile | CR | Huawei | 28.541 17.5.0 CR#664 catB | eMEMTANE | Rel-17 |
S5-141-e AI: 6.4.7 |
not pursued | [WTS] [JSN] |
S5-221222 | Rel-17 CR TS 28.533 Add tenant solution description | CR | Huawei | 28.533 17.1.0 CR#99 catB | eMEMTANE | Rel-17 |
S5-141-e AI: 6.4.7 |
not pursued | [WTS] [JSN] |
S5-221223 | Revised work item on management of the enhanced tenant concept |
WID revised revised to S5-221738 |
Huawei | eMEMTANE | Rel-17 |
S5-141-e AI: 6.4.7 |
revised | [WTS] [JSN] | |
S5-221224 | pCR 28.538 adding EDN IOC |
pCR revised to S5-221629 |
Huawei | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221225 | pCR 28.538 adding modification requirement in LCM | pCR | Huawei | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221226 | pCR 28.538 adding query requirement in LCM | pCR | Huawei | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221227 | pCR 28.538 removal of partially failure | pCR | Huawei | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221228 | pCR 28.538 update Edge NRM figure |
pCR revised to S5-221630 |
Huawei | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221229 | Rel-17 pCR 32.847 Conclusions for KI#3 |
pCR revised to S5-221654 |
MATRIXX Software | 32.847 1.0.0 | FS_NETSLICE_CH_Ph2 | Rel-17 |
S5-141-e AI: 7.5.2 |
revised | [WTS] [JSN] |
S5-221230 | SID revised was SP-210131 SID on network slice management capability exposure |
SID revised revised to S5-221740 |
Alibaba Group | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] | |
S5-221231 | New WID on Network Slice charging based on 5G data connectivity |
WID new revised to S5-221655 |
MATRIXX Software | Rel-17 |
S5-141-e AI: 7.2 |
revised | [WTS] [JSN] | ||
S5-221232 | Rel-17 CR 32.255 Introduction of Annex on Network Slice charging |
CR revised to S5-221674 |
MATRIXX Software | 32.255 17.4.0 CR#366 catB | DUMMY | Rel-17 |
S5-141-e AI: 7.2 |
revised | [WTS] [JSN] |
S5-221233 | Update Inventory stage2 to support SBMA |
CR revision of S5-216092 |
Ericsson Hungary Ltd | 28.632 16.0.0 CR#51 catB | NSA_SBMA | Rel-17 |
S5-141-e AI: 6.4.19 |
not pursued | [WTS] [JSN] |
S5-221234 | pCR 28.312 Update the clause 4.5, 6.2.1 and annex A to align with intent definition | pCR | China Mobile Com. Corporation | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
noted | [WTS] [JSN] |
S5-221235 | New SID on Management Aspects of URLLC | SID new | China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
withdrawn | [WTS] [JSN] | ||
S5-221236 | Rel-17 CR TS 28.552 Modify description of MIMO PRB usage for cell |
CR revised to S5-221539 |
China Unicom | 28.552 17.5.0 CR#344 catF | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
revised | [WTS] [JSN] |
S5-221237 | Rel-17 CR TS 28.552 Modify description of sampling occasion for scheduled layers |
CR revised to S5-221540 |
China Unicom | 28.552 17.5.0 CR#345 catF | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
revised | [WTS] [JSN] |
S5-221238 | Update intent fulfillment tracking in information model | pCR | Nokia Germany | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
noted | [WTS] [JSN] |
S5-221239 | New SID on Basic SBMA enabler enhancements |
SID new revised to S5-221506 |
Nokia, Nokia Shanghai Bell |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | |||
S5-221240 | Rel-17 CR 28.532 Add jobId to FileInfo |
CR revised to S5-221622 |
Nokia, Nokia Shanghai Bell | 28.532 16.10.0 CR#196 catB | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
revised | [WTS] [JSN] |
S5-221241 | New SID on Management Aspects of URLLC |
SID new revised to S5-221507 |
China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221242 | New Rel-18 SID on alignment with GSMA OPG and ETSI MEC for Edge computing management |
SID new revised to S5-221508 |
Samsung Electronics Benelux BV | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221243 | Rel-17 Input to DraftCR 28.622 Resolving editor's notes for FIMA | other | Nokia, Nokia Shanghai Bell | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
approved | [WTS] [JSN] | |
S5-221244 | Rel-17 Input to DraftCR 28.622 Add file download NRM fragment | other | Nokia, Nokia Shanghai Bell | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
merged | [WTS] [JSN] | |
S5-221245 | WI Exception for eNETSLICE_PRO |
WI exception request revised to S5-221711 |
Samsung Electronics Benelux BV | NETSLICE-PRO_NS | Rel-17 |
S5-141-e AI: 6.4.21 |
revised | [WTS] [JSN] | |
S5-221246 | TS 28.531 Add/Modify procedure of reservation of Network Slice/ Network Slice Subnet | CR | Nokia, Nokia Shanghai Bell | 28.531 17.2.0 CR#100 catB | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221247 | Rel-17 CR 28.623 Add file retrieval NRM fragment (OpenAPI definitions) | CR | Nokia, Nokia Shanghai Bell | 28.623 17.0.0 CR#148 catB | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
agreed | [WTS] [JSN] |
S5-221248 | Rel-17 CR 28.623 Add file download NRM fragment (OpenAPI definitions) |
CR revised to S5-221758 |
Nokia, Nokia Shanghai Bell | 28.623 17.0.0 CR#149 catB | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
revised | [WTS] [JSN] |
S5-221249 | Rel-17 CR 28.531 Fixing Network slice and network slice subnet provisioning management service - profiles convert to IOC - Stage 3 | CR | Samsung Electronics Benelux BV | 28.531 17.2.0 CR#101 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221250 | pCR 28.104 Update use case and requirement for MDA assisted energy saving analysis | pCR | China Telecom Corporation Ltd. | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221251 | pCR 28.104 Add MDA capability for MDA assisted energy saving analysis |
pCR revised to S5-221612 |
China Telecom Corporation Ltd. | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221252 | Rel-17 CR 28.541 Converting ServiceProfile and SliceProfile to IOC | CR | Samsung Electronics Benelux BV | 28.541 17.5.0 CR#665 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221253 | TS 28.531 Asynchronous network slicing procedures using createMOI | CR | Nokia, Nokia Shanghai Bell | 28.531 17.2.0 CR#102 catB | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221254 | TS 28.541 Clean up of eMA5SLA |
CR revised to S5-221533 |
CMCC | 28.541 17.5.0 CR#666 catF | EMA5SLA | Rel-17 |
S5-141-e AI: 6.4.2 |
revised | [WTS] [JSN] |
S5-221255 | TS 28.541 Update 5G NRM to solve CR clash in Figure 5.2.1.2 | CR | CMCC,CATT | 28.541 17.5.0 CR#667 catF | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221256 | YANG Solution Set for Inventory Management |
CR revision of S5-216398 |
Ericsson Hungary Ltd | 28.633 16.0.0 CR#92 catB | NSA_SBMA | Rel-17 |
S5-141-e AI: 6.4.19 |
not pursued | [WTS] [JSN] |
S5-221257 | S5-xxxxxx Rel-17 CR TS 28.552 Adding new packets based performance measurements | CR | Harman GmbH | 28.552 17.5.0 CR#346 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
withdrawn | [WTS] [JSN] |
S5-221258 | pCR TR 28.824 add solution on eMnS discovery service |
pCR revised to S5-221570 |
AsiaInfo, Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-221259 | pCR TR 28.824 add procedure for exposed MnS registration |
pCR revised to S5-221571 |
AsiaInfo, Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-221260 | pCR TS 28.312 Add attributes of the IntentReport | pCR | AsiaInfo | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
noted | [WTS] [JSN] |
S5-221261 | pCR TS 28.312 update clause 4.2.2 and clause 6.3.3 |
pCR revised to S5-221755 |
AsiaInfo | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-221262 | Rel-16 CR 28.541 Network slice subnet capability IOC | CR | Samsung Electronics Benelux BV | 28.541 17.5.0 CR#668 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221263 | New SID on Digital twin for network management | SID new | CMCC | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221264 | S5-xxxxxx Rel-17 CR TS 28.552 Updating packets based performance measurements | CR | Harman GmbH | 28.552 17.5.0 CR#347 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
withdrawn | [WTS] [JSN] |
S5-221265 | Management Aspect of User Plane Enhancement |
SID new revised to S5-221509 |
CMCC | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221266 | S5-xxxxxx Rel-17 CR TS 28.554 Define Reliability KPI in 5G Network | CR | Harman GmbH | 28.554 17.5.0 CR#89 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
withdrawn | [WTS] [JSN] |
S5-221267 | pCR 28.824 Describe possible solutions for eMnS discovery service | pCR | Huawei, Ericsson | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221268 | Add S-NSSAI mapping to support National Roaming | CR | Ericsson India Private Limited (TSDSI) | 28.541 17.5.0 CR#669 catB | EMA5SLA | Rel-17 |
S5-141-e AI: 6.4.2 |
not pursued | [WTS] [JSN] |
S5-221269 | Rel-17 CR 28.531 Network slice subnet capabilities | CR | Samsung Electronics Benelux BV | 28.531 17.2.0 CR#103 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221270 | Rel-17 CR 28.531 Fixing Network slice and network slice subnet provisioning management service - profiles not convert to IOC - Stage 3 |
CR revised to S5-221710 |
Samsung Electronics Benelux BV | 28.531 17.2.0 CR#104 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
revised | [WTS] [JSN] |
S5-221271 | pCR draft TS28.104, Rapporteur clean- | pCR | NEC, Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221272 | Rel-17 CR 28.552 performance measurements for ECS - EES Registration |
CR revised to S5-221638 |
Samsung Electronics Benelux BV | 28.552 17.5.0 CR#348 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221273 | pCR draft TS28.104, further clarifications and supporting text for clause 6.3 MDA role in cross-domain service assurance | pCR | NEC, Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221274 | Rel-16 CR 28.622 Add missing definitions of common data types |
CR revision of S5-216287 |
Nokia, Nokia Shanghai Bell | 28.622 16.10.0 CR#1073 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221275 | Rel-17 CR 28.552 performance measurements for ECS - Service Provisioning |
CR revised to S5-221639 |
Samsung Electronics Benelux BV | 28.522 16.0.0 CR#6 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221276 | Rel-17 CR 28.552 performance measurements for EES - EAS Discovery |
CR revised to S5-221705 |
Samsung Electronics Benelux BV | 28.552 17.5.0 CR#349 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221277 | Attachment_3GPP Inputs to GSMA OPAG API Mapping_ after SA5 CH call | discussion | WG Vice Chair (MATRIXX Software) | Rel-17 |
S5-141-e AI: 7.1 |
noted | [WTS] [JSN] | ||
S5-221278 | Rel-17 CR 28.552 performance measurements for EES - EEC Registration |
CR revised to S5-221706 |
Samsung Electronics Benelux BV | 28.552 17.5.0 CR#350 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221279 | Rel-17 CR 28.552 performance measurements for EES - EAS Registration |
CR revised to S5-221707 |
Samsung Electronics Benelux BV | 28.552 17.5.0 CR#351 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221280 | Rel-17 InputToDraftCR 28.537 Targeted management data collection | other | Samsung Electronics Benelux BV | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
noted | [WTS] [JSN] | |
S5-221281 | Rel-17 InputToDraftCR 28.622 ManagementDataSubscription | other | Samsung, Ericsson | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
noted | [WTS] [JSN] | |
S5-221282 | Rel-17 Discussion paper on definition of tenant |
discussion revised to S5-221547 |
Ericsson España S.A. | Rel-17 |
S5-141-e AI: 5.2 |
revised | [WTS] [JSN] | ||
S5-221283 | pCR 28.538 ECS Performance MnS |
pCR revised to S5-221634 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221284 | NRM enhancements for the SMFFunction (stage 3) |
CR revised to S5-221556 |
Nokia Germany | 28.541 17.5.0 CR#670 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-221285 | pCR 28.538 ECS Performance assurance |
pCR revised to S5-221635 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221286 | pCR 28.538 EES Performance MnS |
pCR revised to S5-221636 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221287 | pCR 28.538 EES Performance assurance |
pCR revised to S5-221637 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221288 | pCR 28.538 EASFunction Definition |
pCR revised to S5-221631 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221289 | pCR 28.538 EESFunction definition |
pCR revised to S5-221632 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221290 | pCR 28.538 EES LCM procedure |
pCR revised to S5-221708 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221291 | pCR 28.538 ECSFunction Definition |
pCR revised to S5-221633 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221292 | pCR 28.104 add alarm analysis | pCR | China Mobile Com. Corporation | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221293 | pCR 28.104 add inter-gNB beam selection optimization solution | pCR | China Mobile Com. Corporation | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221294 | pCR 28.104 Add MDA assisted energy saving solution | pCR | China Mobile Com. Corporation | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
merged | [WTS] [JSN] |
S5-221295 | Updated WID Edge Computing Management | WID revised | Samsung Electronics Benelux BV | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
agreed | [WTS] [JSN] | |
S5-221296 | Rel-17 CR 28.622 Add attribute to configure an identifier of a TraceJob |
CR revised to S5-221623 |
Nokia, Nokia Shanghai Bell | 28.622 17.0.0 CR#134 catB | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
revised | [WTS] [JSN] |
S5-221297 | Rel-17 28.622 enhance NRM to support access control | CR | Nokia, Nokia Shanghai Bell | 28.622 17.0.0 CR#135 catB | MSAC | Rel-17 |
S5-141-e AI: 6.4. |
not pursued | [WTS] [JSN] |
S5-221298 | Rel-17 28.623 enhance NRM to support access control (stage3) | CR | Nokia, Nokia Shanghai Bell | 28.623 17.0.0 CR#150 catB | MSAC | Rel-17 |
S5-141-e AI: 6.4. |
not pursued | [WTS] [JSN] |
S5-221299 | Add MDA context |
pCR revised to S5-221615 |
Nokia Germany | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221300 | New Rel-18 WID on enhanced Edge Computing Management |
WID new revised to S5-221554 |
Samsung Electronics Benelux BV | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221301 | Rel-17 28.532 enhance OpenAPI to support access control | CR | Nokia, Nokia Shanghai Bell | 28.532 16.10.0 CR#197 catB | MSAC | Rel-17 |
S5-141-e AI: 6.4. |
withdrawn | [WTS] [JSN] |
S5-221302 | Add MDA types |
pCR revised to S5-221603 |
Nokia Germany | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221303 | New WID on enhancement of 5G+ NRM features |
WID new revised to S5-221510 |
Nokia, Nokia Shanghai Bell | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221304 | Rel-17 CR 32.291 Correcting response code 2xx |
CR revised to S5-221683 |
Ericsson LM | 32.291 17.1.0 CR#369 catF | TEI17 | Rel-17 |
S5-141-e AI: 7.3 |
revised | [WTS] [JSN] |
S5-221305 | Rel-17 CR 32.291 Correcting response code 3xx | CR | Ericsson LM | 32.291 17.1.0 CR#370 catF | TEI17 | Rel-17 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221306 | Rel-17 CR 32.291 Correcting response code 4xx |
CR revised to S5-221684 |
Ericsson LM | 32.291 17.1.0 CR#371 catF | TEI17 | Rel-17 |
S5-141-e AI: 7.3 |
revised | [WTS] [JSN] |
S5-221307 | Rel-17 CR 32.291 Correcting response code 5xx | CR | Ericsson LM | 32.291 17.1.0 CR#372 catF | TEI17 | Rel-17 |
S5-141-e AI: 7.3 |
not pursued | [WTS] [JSN] |
S5-221308 | Rel-17 CR 32.255 Correcting charging rule base name |
CR revised to S5-221685 |
Ericsson LM | 32.255 17.4.0 CR#367 catF | TEI17 | Rel-17 |
S5-141-e AI: 7.3 |
revised | [WTS] [JSN] |
S5-221309 | Rel-16 CR 32.291 Correcting quota management suspended | CR | Ericsson LM | 32.291 16.10.0 CR#373 catF | CHFCQM | Rel-16 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221310 | Rel-17 CR 32.291 Correcting quota management suspended | CR | Ericsson LM | 32.291 17.1.0 CR#374 catA | CHFCQM | Rel-17 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221311 | Rel-17 CR 32.291 Addition of IMS converged charging yaml |
CR revised to S5-221649 |
Ericsson LM | 32.291 17.1.0 CR#375 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-221312 | Rel-17 CR 32.298 Addition of IMS converged charging ASN.1 |
CR revised to S5-221686 |
Ericsson LM | 32.298 17.1.0 CR#887 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-221313 | Rel-17 CR 32.291 Addition of MMTel converged charging yaml |
CR revised to S5-221650 |
Ericsson LM | 32.291 17.1.0 CR#376 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-221314 | Rel-17 CR 32.298 Addition of MMTel converged charging ASN.1 |
CR revised to S5-221687 |
Ericsson LM | 32.298 17.1.0 CR#888 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-221315 | Rel-17 CR 32.291 Addition of IMS converged charging announcement yaml |
CR revised to S5-221651 |
Ericsson LM | 32.291 17.1.0 CR#377 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S5-221316 | Rel-17 pCR 28.826 Restructuring clauses 5.3 to 5.5 |
pCR revised to S5-221682 |
Ericsson LM | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-221317 | Rel-17 pCR 28.826 Adding PCF based solution to clause 5.5 | pCR | Ericsson LM | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
noted | [WTS] [JSN] |
S5-221318 | Rel-17 pCR 28.826 Adding use case for operator defined trigger |
pCR revised to S5-221726 |
Ericsson LM | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-221319 | Rel-17 pCR 28.826 Adding service identifier based solution to clause 5.3 | pCR | Ericsson LM | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
noted | [WTS] [JSN] |
S5-221320 | Rel-17 pCR 28.826 Adding use case for cancel failed event |
pCR revised to S5-221736 |
Ericsson LM | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
revised | [WTS] [JSN] |
S5-221321 | Rel-17 pCR 28.827 Corrections to clause 7.1 |
pCR revised to S5-221681 |
Ericsson LM | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
revised | [WTS] [JSN] |
S5-221322 | Rel-17 pCR 28.827 Corrections to clause 7.2 | pCR | Ericsson LM | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-221323 | Rel-17 pCR 28.827 Corrections to clause 7.3 | pCR | Ericsson LM | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-221324 | Rel-17 pCR 28.827 Corrections to clause 7.4 | pCR | Ericsson LM | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-221325 | Rel-17 pCR 28.827 Adding use case and solution for clause 7.5 | pCR | Ericsson LM | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
noted | [WTS] [JSN] |
S5-221326 | Rel-17 pCR 28.827 Adding use case and solution for clause 7.6 |
pCR revised to S5-221679 |
Ericsson LM | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
revised | [WTS] [JSN] |
S5-221327 | Presentation sheet for approval to TS 28.538 |
TS or TR cover revised to S5-221762 |
Samsung Electronics Benelux BV | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] | |
S5-221328 | Correct YANG Network Slice NRM solution set reference | CR | Ericsson LM | 28.622 17.0.0 CR#136 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.3 |
withdrawn | [WTS] [JSN] |
S5-221329 | New SID Study on Management of Cloud Native Virtualized Network Functions |
SID new revised to S5-221511 |
China Mobile Com. Corporation | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221330 | Rel-17 Input to DraftCR 28.622 Add file download control NRM fragment |
other revision of S5-216291 revised to S5-221757 |
Ericsson LM | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
revised | [WTS] [JSN] | |
S5-221331 | Add QMC job | CR | Ericsson LM | 28.622 17.0.0 CR#137 catB | eQoE | Rel-17 |
S5-141-e AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-221332 | pCR 28.105 Add scope |
pCR revised to S5-221616 |
Intel, NEC | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221333 | pCR 28.105 Add overview |
pCR revised to S5-221617 |
Intel, NEC | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221334 | pCR 28.105 Add service framework for AI-ML model training |
pCR revised to S5-221618 |
Intel, NEC | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221335 | pCR 28.105 Move in ML model training part from TS 28.104 | pCR | Intel | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221336 | pCR 28.105 Add NRMs for AI-ML model training |
pCR revised to S5-221620 |
Intel | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221337 | Initial skeleton (v000) of TS 28.105 | pCR | Intel | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221338 | pCR 28.104 Move out ML model training part to TS 28.105 |
pCR revised to S5-221619 |
Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221339 | pCR 28.104 Update NRM for MDA request |
pCR revised to S5-221613 |
Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221340 | Editorial clean up of mobilty KPIs HO success rate | CR | Ericsson Limited | 28.554 16.8.0 CR#90 catF | TEI16 | Rel-16 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221341 | pCR 28.104 Update MDA service framework and data definitions for coverage problem analysis |
pCR revised to S5-221607 |
Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221342 | CR Rel-17 28.552 Add measurements to support coverage problem analysis for MDA |
CR revised to S5-221608 |
Intel | 28.552 17.5.0 CR#352 catB | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
revised | [WTS] [JSN] |
S5-221343 | New SID on Advanced Alarm Management for 5G |
SID new revised to S5-221368 |
China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221344 | CR Rel-17 28.552 Add measurements related to location context transfer for LMF |
CR revised to S5-221543 |
Intel | 28.552 17.5.0 CR#353 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
revised | [WTS] [JSN] |
S5-221345 | Editorial clean up of mobilty KPIs HO success rate | CR | Ericsson Limited | 28.554 17.5.0 CR#91 catA | E_HOO | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221346 | CR Rel-17 28.552 Add measurements related to location determination for LMF |
CR revised to S5-221544 |
Intel | 28.552 17.5.0 CR#354 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
revised | [WTS] [JSN] |
S5-221347 | New SID on Network Data Quality Management | SID new | China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221348 | pCR 32.257 Add charging information 5GS usage charging for edge enabling |
pCR revised to S5-221688 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-221349 | CR Rel-17 32.255 Add charging information for 5GS usage for Edge Computing |
CR revised to S5-221720 |
Intel | 32.255 17.4.0 CR#368 catB | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-221350 | pCR 32.257 Add principles and scenarios for edge enabling infrastructure resource usage charging |
pCR revised to S5-221658 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-221351 | pCR 32.257 Add charging information definition for edge enabling infrastructure resource usage charging |
pCR revised to S5-221659 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-221352 | pCR 32.257 Add principles and scenarios for edge application server deployment charging |
pCR revised to S5-221660 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-221353 | New SID on Management Aspect Enhancement of 5G MOCN Network Sharing |
SID new revision of S5-221204 revised to S5-221512 |
China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221354 | pCR 32.257 Add charging information definition for edge application server deployment charging |
pCR revised to S5-221663 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-221355 | pCR 32.257 Add principles and scenarios for edge enabling services charging |
pCR revised to S5-221661 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
revised | [WTS] [JSN] |
S5-221356 | Update to include NR and adding VR | CR | Ericsson Limited | 28.405 17.0.0 CR#8 catB | eQoE | Rel-17 |
S5-141-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
S5-221357 | pCR 32.257 Add charging information definition for edge enabling services charging | pCR | Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
noted | [WTS] [JSN] |
S5-221358 | Revised WID Charging aspects of edge computing | WID revised | Intel | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
S5-221359 | New SID on intent-driven management for network slicing |
SID new revised to S5-221513 |
Ericsson Inc. |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | |||
S5-221360 | New SID on Knowledge Management Service | WID new | China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221361 | WI Exception for ECM | WI exception request | Samsung Electronics Benelux BV | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
noted | [WTS] [JSN] | |
S5-221362 | Rel-17 Input to DraftCR 28.537 Add requirements for context data |
other revision of S5-216293 revised to S5-221559 |
Nokia, Nokia Shanghai ell | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
revised | [WTS] [JSN] | |
S5-221363 | Rel-17 Input to DraftCR 28.537 Add requirements for managing external management data |
other revision of S5-216292 |
Nokia, Nokia Shanghai Bell | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
noted | [WTS] [JSN] | |
S5-221364 | Rel-17 Input to DraftCR 28.622 Add solution for reporting and storing data |
other revision of S5-216294 |
Nokia, Nokia Shanghai Bell | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
noted | [WTS] [JSN] | |
S5-221365 | Rel-17 28.532 enhance OpenAPI to support access control | CR | Nokia, Nokia Shanghai Bell | 28.532 16.10.0 CR#198 catB | MSAC | Rel-17 |
S5-141-e AI: 6.4. |
not pursued | [WTS] [JSN] |
S5-221366 | pCR - 28.819 Proposed overall process | pCR | China Mobile Com. Corporation | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
noted | [WTS] [JSN] |
S5-221367 | pCR draft TS28.104, add historical data handling for MDA | pCR | NEC, Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
withdrawn | [WTS] [JSN] |
S5-221368 | New SID on Advanced Alarm Management for 5G |
SID new revision of S5-221343 |
China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221369 | New WID on continuous integration continuous delivery support for 3GPP NFs | WID new | China Mobile Com. Corporation | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221370 | pCR - 28.819 - Solution of test orchestration | pCR | China Mobile Com. Corporation | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
noted | [WTS] [JSN] |
S5-221371 | Input to DraftCR Add file download NRM fragment, YANG |
other revised to S5-221759 |
Ericsson LM | FIMA |
S5-141-e AI: 6.4.17 |
revised | [WTS] [JSN] | ||
S5-221372 | New SID on Management Model of Base Station | SID new | China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221373 | Reply LS on network slice management service consumption |
LS out LS To: SA6 revised to S5-221551 |
Alibaba Group | Rel-17 |
S5-141-e AI: 5.3 |
revised | [WTS] [JSN] | ||
S5-221374 | Rel-17 CR 28.541 Update maximumDeviationHoTrigger | CR | Ericsson France S.A.S | 28.541 17.5.0 CR#671 catC | SON_5G | Rel-17 |
S5-141-e AI: 6.3 |
withdrawn | [WTS] [JSN] |
S5-221375 | Rel-16 CR 28.552 Correct wording and header | CR | Ericsson France S.A.S | 28.552 16.12.0 CR#355 catF | 5G_SLICE_ePA | Rel-16 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221376 | Rel-17 CR 28.552 Correct wording and header | CR | Ericsson France S.A.S | 28.552 17.5.0 CR#356 catA | 5G_SLICE_ePA | Rel-17 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221377 | Rel-17 CR 28.552 Conditional handover measurements |
CR revised to S5-221595 |
Ericsson France S.A.S | 28.552 17.5.0 CR#357 catB | E_HOO | Rel-17 |
S5-141-e AI: 6.4.12 |
revised | [WTS] [JSN] |
S5-221378 | Rel-17 CR 28.554 Add KPI for HO success rate for all handover types |
CR revised to S5-221596 |
Ericsson France S.A.S | 28.554 17.5.0 CR#92 catB | E_HOO | Rel-17 |
S5-141-e AI: 6.4.12 |
revised | [WTS] [JSN] |
S5-221379 | Input to Draft CR 28.313 E_HOO End-of-release cleanup | other | Ericsson France S.A.S | E_HOO | Rel-17 |
S5-141-e AI: 6.4.12 |
approved | [WTS] [JSN] | |
S5-221380 | WID Enhancement_Handover_optimization | WID revised | Ericsson France S.A.S | E_HOO | Rel-17 |
S5-141-e AI: 6.4.12 |
withdrawn | [WTS] [JSN] | |
S5-221381 | DraftCR for E-HOO - TS 28.313 | draftCR | Ericsson France S.A.S | E_HOO | Rel-17 |
S5-141-e AI: 6.4.12 |
approved | [WTS] [JSN] | |
S5-221382 | Correct maximumDeviationHoTrigger |
CR revision of S5-216326 revised to S5-221517 |
Ericsson France S.A.S | 28.541 17.5.0 CR#6331 catC | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
revised | [WTS] [JSN] |
S5-221383 | Add Annex with code of UML diagrams | CR | Ericsson GmbH, Eurolab, Deutsche Telekom | 28.536 17.1.0 CR#39 catB | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
agreed | [WTS] [JSN] |
S5-221384 | pCR 28.312 ServiceDeploymentExpectation definition |
pCR revised to S5-221754 |
Samsung Electronics Benelux BV | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
revised | [WTS] [JSN] |
S5-221385 | Update assurance scope data type description | CR | Ericsson GmbH, Eurolab, Deutsche Telekom | 28.536 17.1.0 CR#40 catF | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
not pursued | [WTS] [JSN] |
S5-221386 | Discussion paper on cleaning up the eCosla stage 2 descriptions | discussion | Ericsson GmbH, Eurolab, Deutsche Telekom |
S5-141-e AI: 6.4. |
noted | [WTS] [JSN] | |||
S5-221387 | Input to draftCR TS 28.536 clean up stage 2 descriptions |
CR revised to S5-221588 |
Ericsson GmbH, Eurolab, Deutsche Telekom | 28.536 17.1.0 CR#41 catC | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
revised | [WTS] [JSN] |
S5-221388 | Discussion paper on communication service assurance and closed control loops | discussion | Ericsson GmbH, Eurolab |
S5-141-e AI: 6.4. |
noted | [WTS] [JSN] | |||
S5-221389 | Discussion paper on eCosla completion |
discussion revised to S5-221589 |
Ericsson GmbH, Eurolab |
S5-141-e AI: 6.4. |
revised | [WTS] [JSN] | |||
S5-221390 | Correct YANG Network Slice NRM solution set reference | CR | Ericsson LM | 28.541 17.5.0 CR#672 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221391 | Revised WID on Enhanced Closed loop SLS assurance |
WID revised revised to S5-221590 |
Ericsson GmbH, Eurolab | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
revised | [WTS] [JSN] | |
S5-221392 | Add QMC job, stage 3 YANG module | CR | Ericsson LM | 28.623 17.0.0 CR#151 catB | eQoE | Rel-17 |
S5-141-e AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-221393 | Clarify handling of modified network slice profile | CR | Ericsson GmbH, Eurolab | 28.531 17.2.0 CR#105 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221394 | Add network slice job class to NRM discussion | CR | Ericsson GmbH, Eurolab | 28.541 17.5.0 CR#673 catB | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221395 | Update high level ProSe architecture |
CR revised to S5-221676 |
CATT | 32.277 17.0.0 CR#35 catF | 5G_ProSe | Rel-17 |
S5-141-e AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-221396 | Update general charging principles for 5G ProSe |
CR revised to S5-221662 |
CATT | 32.277 17.0.0 CR#36 catB | 5G_ProSe | Rel-17 |
S5-141-e AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-221397 | Adding basic principles for 5G ProSe convergent charging |
CR revised to S5-221652 |
CATT | 32.277 17.0.0 CR#37 catB | 5G_ProSe | Rel-17 |
S5-141-e AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-221398 | Adding message flows for 5G ProSe Direct Discovery converged charging |
CR revised to S5-221653 |
CATT | 32.277 17.0.0 CR#38 catB | 5G_ProSe | Rel-17 |
S5-141-e AI: 7.4.4 |
revised | [WTS] [JSN] |
S5-221399 | Update 5GC NRM for 5G_DDNMF |
CR revised to S5-221516 |
CATT | 28.541 17.5.0 CR#674 catF | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
revised | [WTS] [JSN] |
S5-221400 | Revised WID on Enhancement of Handover Optimization | WID revised | Ericsson France S.A.S | E_HOO | Rel-17 |
S5-141-e AI: 6.4.12 |
agreed | [WTS] [JSN] | |
S5-221401 | Rel-17 Input to DraftCR 28.622 Add data collection job to allow consumers without detailed knowledge of the network to request for data | draftCR | Nokia, Nokia Shanghai Bell | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
noted | [WTS] [JSN] | |
S5-221402 | Rel-17 CR 28.622 Add data type to enable operations such as threshold monitoring or data collection according to a schedule | CR | Nokia, Nokia Shanghai Bell | 28.622 17.0.0 CR#138 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
not pursued | [WTS] [JSN] |
S5-221403 | Rel-16 CR 28.622 Structuring of TraceJob IOC and Clean Up | CR | Nokia, Nokia Shanghai Bell | 28.622 16.10.0 CR#139 catF | 5GMDT | Rel-16 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221404 | Rel-17 CR 28.622 Structuring of TraceJob IOC and Clean Up | CR | Nokia, Nokia Shanghai Bell | 28.622 17.0.0 CR#140 catA | 5GMDT | Rel-17 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221405 | Rel-17 CR 28.623 Structuring of TraceJob IOC and Clean Up | CR | Nokia, Nokia Shanghai Bell | 28.623 17.0.0 CR#152 catA | 5GMDT | Rel-17 |
S5-141-e AI: 6.3 |
not pursued | [WTS] [JSN] |
S5-221406 | Rel-17 CR 28.622 Add parameter to configure beam level measurements in NR MDT | CR | Nokia, Nokia Shanghai Bell | 28.622 17.0.0 CR#141 catB | e_5GMDT | Rel-17 |
S5-141-e AI: 6.4.3 |
agreed | [WTS] [JSN] |
S5-221407 | Rel-17 CR 28.623 Add parameter to configure beam level measurements in NR MDT | CR | Nokia, Nokia Shanghai Bell | 28.623 17.0.0 CR#153 catB | e_5GMDT | Rel-17 |
S5-141-e AI: 6.4.3 |
agreed | [WTS] [JSN] |
S5-221408 | Rel-17 CR 28.623 Add attribute to configure an identifier of a TraceJob | CR | Nokia, Nokia Shanghai Bell | 28.623 17.0.0 CR#154 catB | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
agreed | [WTS] [JSN] |
S5-221409 | Discussion paper on Management Data Collection Job | discussion | Nokia, Nokia Shanghai Bell | MADCOL | Rel-17 |
S5-141-e AI: 6.4.7 |
noted | [WTS] [JSN] | |
S5-221410 | Rel-17 draftCR 28.537 Add requirements for data management |
draftCR revision of S5-216098 |
Nokia, Nokia Shanghai Bell | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
noted | [WTS] [JSN] | |
S5-221411 | Rel-16 CR 32.422 Alignment of parameter names and clean up |
CR revised to S5-221524 |
Nokia, Nokia Shanghai Bell | 32.422 16.8.0 CR#389 catF | 5GMDT | Rel-16 |
S5-141-e AI: 6.3 |
revised | [WTS] [JSN] |
S5-221412 | Rel-17 CR 32.422 Alignment of parameter names and clean up |
CR revised to S5-221525 |
Nokia, Nokia Shanghai Bell | 32.422 17.5.0 CR#390 catA | 5GMDT | Rel-17 |
S5-141-e AI: 6.3 |
revised | [WTS] [JSN] |
S5-221413 | Rel-17 CR 28.552 Enhance PM on Handover failures per beam related to MRO for intra-system mobility | CR | Nokia, Nokia Shanghai Bell | 28.552 17.5.0 CR#358 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221414 | Rel-17 CR 28.552 Add PM on Angle of Arrival | CR | Nokia, Nokia Shanghai Bell | 28.552 17.5.0 CR#359 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
not pursued | [WTS] [JSN] |
S5-221415 | Adding QMC job | CR | Ericsson Limited | 28.622 17.0.0 CR#142 catB | eQoE | Rel-17 |
S5-141-e AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-221416 | YANG Solution Set for Generic Radio Access Network NRM |
CR revision of S5-216392 |
Ericsson Hungary Ltd | 28.663 16.0.0 CR#222 catB | NSA_SBMA | Rel-17 |
S5-141-e AI: 6.4.19 |
not pursued | [WTS] [JSN] |
S5-221417 | TS 28.541 Rel-17 CR TS 28.541 Add Reservation check NRM fragment | CR | Nokia, Nokia Shanghai Bell | 28.541 17.5.0 CR#675 catB | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
not pursued | [WTS] [JSN] |
S5-221418 | Rel-17 CR TS 28.541 Asynchronous Network Slice provisioning using createMOI | CR | Nokia, Nokia Shanghai Bell | 28.541 17.5.0 CR#676 catB | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
withdrawn | [WTS] [JSN] |
S5-221419 | Rel-17 Input to DraftCR 28.622 Add solution for data discovery | draftCR | Ericsson Telecomunicazioni SpA | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
noted | [WTS] [JSN] | |
S5-221420 | Technical Discussion on TTM reduction for new Service offerings | discussion | Ericsson Telecomunicazioni SpA | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
noted | [WTS] [JSN] | |
S5-221421 | Update intent information model | pCR | Ericsson Telecomunicazioni SpA | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
noted | [WTS] [JSN] |
S5-221422 | New SID on further Enhancements of Management of Trace/MDT |
SID new revised to S5-221514 |
Nokia, Nokia Shanghai Bell | Rel-18 |
S5-141-e AI: 6.2 |
revised | [WTS] [JSN] | ||
S5-221423 | Add solution for product and service order procedures to clause 7 |
pCR revised to S5-221742 |
Ericsson GmbH, Eurolab | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-221424 | eMnS service | pCR | Ericsson GmbH, Eurolab | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221425 | Input to issues and gaps in clause 5 | pCR | Ericsson GmbH, Eurolab | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221426 | Input to potential requirements in clause 6 | pCR | Ericsson GmbH, Eurolab | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221427 | Input to potential solutions in clause 7.1 | pCR | Ericsson GmbH, Eurolab | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221428 | Rel-17 CR 28.623 Add data type to enable operations such as threshold monitoring or data collection according to a schedule | CR | Nokia, Nokia Shanghai Bell | 28.622 17.0.0 CR#143 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
not pursued | [WTS] [JSN] |
S5-221429 | Move key issue list out of clause 4 | pCR | Ericsson GmbH, Eurolab | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221430 | Update procedure and add solution for product on-boarding |
pCR revised to S5-221743 |
Ericsson GmbH, Eurolab | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-221431 | pCR draft TS28.104, add historical data handling for MDA | pCR | NEC, Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221432 | pCR 28.824 Remove EN in 5.4 |
pCR revised to S5-221744 |
Lenovo, Motorola Mobility | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
revised | [WTS] [JSN] |
S5-221433 | pCR 28.824 Update position and add solution for direct MnS exposure | pCR | Lenovo (Beijing) Ltd | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.4.3 |
withdrawn | [WTS] [JSN] |
S5-221434 | pCR 28.824 Update position and add solution for direct MnS exposure | pCR | Lenovo, Motorola Mobility | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221435 | pCR 28.819 Add Intro | pCR | Lenovo, Motorola Mobility, CMCC | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221436 | pCR 28.819 Update to feature selection solution | pCR | Lenovo, Motorola Mobilty, CMCC | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221437 | pCR 28.819 Update Simulation Testing with solution | pCR | Lenovo, Motorola mobility, CMCC | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221438 | pCR 28.819 Update Scope |
pCR revised to S5-221717 |
Lenovo, Motorola mobility, CMCC | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
revised | [WTS] [JSN] |
S5-221439 | pCR 28.819 Remove ENs in Section 4.2 and 6.4.2 and 8 | pCR | Lenovo, Motorola Mobility, CMCC | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221440 | pCR 28.819 Remove EN in Section 6.1.3 | pCR | Lenovo, Motorola Mobility | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221441 | S5-221441 pCR 28.819 Add overall process | pCR | Lenovo, Motorola Mobility | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
noted | [WTS] [JSN] |
S5-221442 | R17 CR 28.536 Add Solution for Pause point | CR | Lenovo, Motorola Mobility | 28.536 17.1.0 CR#42 catB | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
not pursued | [WTS] [JSN] |
S5-221443 | R17 CR 28.536 Add Solution for Pause point | CR | Lenovo (Beijing) Ltd | 28.536 17.1.0 CR#43 catB | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
not pursued | [WTS] [JSN] |
S5-221444 | CR 28.536 Add Solution for disabling CL action | CR | Lenovo (Beijing) Ltd | 28.536 17.1.0 CR#44 catB | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
not pursued | [WTS] [JSN] |
S5-221445 | REl 17 CR 28.535 Convert draft CR S5-215622 | CR | Lenovo (Beijing) Ltd | 28.535 17.4.0 CR#64 catB | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
not pursued | [WTS] [JSN] |
S5-221446 | LS on RAT Type value for NR Redcap |
LS out LS To: CT1,CT3 |
China Mobile Com. Corporation | ARCH_NR_REDCAP | Rel-17 |
S5-141-e AI: 7.4.3 |
noted | [WTS] [JSN] | |
S5-221447 | Rel-17 CR 32.255 Add charging requirement to support NR RedCap |
CR revised to S5-221721 |
China Mobile Com. Corporation | 32.255 17.4.0 CR#369 catB | ARCH_NR_REDCAP | Rel-17 |
S5-141-e AI: 7.4.3 |
revised | [WTS] [JSN] |
S5-221448 | New R18 SID on MP-CP Conflict management and coordination | SID new | Lenovo (Beijing) Ltd | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221449 | Update of Stage 2 / Stage 3 alignment principles in SA5 working procedures |
other revised to S5-221546 |
SA5 Chair, SA5 Vice chair (Huawei) |
S5-141-e AI: 5.1 |
revised | [WTS] [JSN] | |||
S5-221450 | Rel-17 CR TS 28.552 Adding new packets based performance measurements |
CR revised to S5-221545 |
Harman GmbH | 28.552 17.5.0 CR#360 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
revised | [WTS] [JSN] |
S5-221451 | Rel-17 CR TS 28.552 Updating packets based performance measurements |
CR revised to S5-221541 |
Harman GmbH | 28.552 17.5.0 CR#361 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
revised | [WTS] [JSN] |
S5-221452 | Rel-17 CR TS 28.554 Define Reliability KPI in 5G Network | CR | Harman GmbH | 28.552 17.5.0 CR#362 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
not pursued | [WTS] [JSN] |
S5-221453 | Resubmitted LS on Guidelines on Port Allocation for New 3GPP Interfaces | LS in | C4-214848 |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221454 | Reply LS on Guidelines on Port Allocation for New 3GPP Interfaces | LS in | R3-216233 |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221455 | LS on the first deliverable on use cases for autonomous networks from ITU FG-AN | LS in | ITU-T FOCUS GROUP ON AUTONOMOUS NETWORKS (FG-AN) |
S5-141-e AI: 5.3 |
postponed | [WTS] [JSN] | |||
S5-221456 | Liaison: AN LS22: 0001 TM Forum, AN team Response, to liaison S5-215486 |
LS in LS reply in S5-221493, S5-221493 |
TM Forum |
S5-141-e AI: 5.3 |
replied to | [WTS] [JSN] | |||
S5-221457 | Resubmitted LS APT REPORT ON EMERGING CRITICAL APPLICATIONS & USE CASES OF IMT FOR INDUSTRIAL, SOCIETAL AND ENTERPRISE USERS | LS in | APT Wireless Group |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221458 | Liaison Multi-SDO Autonomous Networks (AN) Formal Liaison: Minutes and Actions 22nd Nov 2021 Meeting #13 Ref AN-SDO2021-13 | LS in | TM Forum |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221459 | Resubmitted Liaison Multi-SDO Autonomous Networks Liaison: Intent Management documents for information and feedback | LS in | TM Forum |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221460 | Liaison Multi-SDO Autonomous Networks (AN) Formal Liaison: 22nd November 2021 Meeting Invitation, Agenda, Bridge, and Meeting Schedule Ref AN-SDO2021-13 | LS in | TM Forum |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221461 | Multi-SDO Autonomous Networks (AN) Formal Liaison: Notification of Open Presentation 14th Jan and 31st Jan 2020 (postponed December) formal meeting #15 Ref AN-SDO2022-01 | LS in | TM Forum |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221462 | Reply LS from GSMA Operator Platform API Group to 3GPP SA, SA2, SA5, SA6 and ETSI ISG MEC on edge computing definition and integration | LS in | GSMA |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221463 | Reply LS from GSMA Operator Platform Group to 3GPP SA, SA2, SA5, SA6 and ETSI ISG MEC on edge computing definition and integration. | LS in | GSMA |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221464 | Reply LS ccSA5 on Beam measurement reports for the MDT measurements | LS in | R2-2111476 |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221465 | Reply LS ccSA5 on MDT Stage 2 and Stage 3 Alignment (reply LS to R3-207222) | LS in | R2-2111567 |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221466 | LS ccSA5 on RAN visible QoE | LS in | R2-2111603 |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221467 | Resubmitted LS on RAN3 agreements for NR QoE | LS in | R3-214477 |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221468 | Reply LS (to S5-214652) on the F1 interface for MOCN network sharing for multiple Cell Identity broadcast scenario | LS in | R3-216218 |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221469 | Response to LS Reply LS on Enhancement of RAN Slicing | LS in | R3-216238 |
S5-141-e AI: 6.1 |
postponed | [WTS] [JSN] | |||
S5-221470 | Resubmitted LS on introducing NR RedCap Indication | LS in | S2-2107853 |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221471 | Resubmitted LS on MINT functionality for Disaster Roaming | LS in | S2-2108172 |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221472 | Reply LS ccSA5 on LS on MINT functionality for Disaster Roaming | LS in | S3-214342 |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221473 | Reply LS ccSA5 on LS on MINT functionality for Disaster Roaming | LS in | S3-214416 |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221474 | Reply LS ccSA5 on QoE report handling at QoE pause | LS in | S3-214458 |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221475 | Resubmitted LS on TS 28.404/TS 28.405 Clarification | LS in | S4-211234 |
S5-141-e AI: 6.1 |
postponed | [WTS] [JSN] | |||
S5-221476 | Resubmitted LS on slicing management aspects in relation to SEAL |
LS in LS reply in S5-221548, S5-221548 |
S6-210709 |
S5-141-e AI: 5.3 |
replied to | [WTS] [JSN] | |||
S5-221477 | Resubmitted LS on network slice management service consumption |
LS in LS reply in S5-221560, S5-221551, S5-221560 |
S6-212460 |
S5-141-e AI: 6.1 |
replied to | [WTS] [JSN] | |||
S5-221478 | LS/r on autonomous network levels (reply to 3GPP TSG SA5-S5-215539) |
LS in LS reply in S5-221492, S5-221492 |
ITU-T SG2 |
S5-141-e AI: 5.3 |
replied to | [WTS] [JSN] | |||
S5-221479 | LS on the Consent of Recommendation ITU-T M.3381 (ex. M.resm-AI), "Requirements for energy saving management of 5G RAN system with AI" |
LS in LS reply in S5-221502, S5-221502 |
ITU-T SG2 |
S5-141-e AI: 5.3 |
replied to | [WTS] [JSN] | |||
S5-221480 | LS on consideration of a new work on ITU-T M.fcnhe: "Framework of communication network health evaluation" | LS in | ITU-T SG2 |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221481 | LS/r on methodology harmonization update (reply to 3GPP TSG SA5-S5-215481) | LS in | ITU-T SG2 |
S5-141-e AI: 6.1 |
postponed | [WTS] [JSN] | |||
S5-221482 | LS on ongoing work within ITU-T Study Group 3 (SG3) on new Technical Report on “IMT2020-Related Policy Considering MVNOs” | LS in | ITU-T SG3 |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221483 | LS on Energy Efficiency as guiding principle for new solutions |
LS in LS reply in S5-221501, S5-221501 |
SP-211621 |
S5-141-e AI: 5.3 |
replied to | [WTS] [JSN] | |||
S5-221484 | TR 28.827, Adding Conclusions |
pCR revised to S5-221656 |
Vodafone Italia SpA,MATRIXX Software | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
revised | [WTS] [JSN] |
S5-221485 | Multi-SDO Autonomous Networks (AN) Formal Liaison: Notification of Open Presentation 14th Jan and 21st February 2022 (postponed December) formal meeting #15 Ref AN-SDO2022-01 rev 1 | LS in | TM Forum |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221486 | Forge process update of clause 23.4 and 23.9 in SA5 Working Procedures | other | WG chair |
S5-141-e AI: 5.1 |
approved | [WTS] [JSN] | |||
S5-221487 | Rel-18 work prioritization |
other revised to S5-221500 |
WG chair |
S5-141-e AI: 5.1 |
revised | [WTS] [JSN] | |||
S5-221488 | Correct YANG mapping in TS document | CR | Ericsson Hungary Ltd | 28.541 16.11.0 CR#677 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221489 | Correct YANG mapping in TS document | CR | Ericsson Hungary Ltd | 28.541 17.5.0 CR#678 catA | eNRM | Rel-17 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221490 | e-meeting process |
discussion revision of S5-221002 |
WG Chair |
S5-141-e AI: 5.1 |
noted | [WTS] [JSN] | |||
S5-221491 | Reply LS ccSA5 to GSMA Operator Platform Group on edge computing definition and integration | LS in | SP-220003 |
S5-141-e AI: 5.3 |
noted | [WTS] [JSN] | |||
S5-221492 | Reply to: LS/r on autonomous network levels (reply to 3GPP TSG SA5-S5-215539) |
LS out LS is reply to S5-221478 LS To: ITU-T SG2 |
CMCC |
S5-141-e AI: 5.3 |
approved | [WTS] [JSN] | |||
S5-221493 | Reply to: Liaison: AN LS22: 0001 TM Forum, AN team Response, to liaison S5-215486 |
LS out LS is reply to S5-221456 LS To: TM Forum |
Ericsson |
S5-141-e AI: 5.3 |
approved | [WTS] [JSN] | |||
S5-221494 | Reply LS on Intent Management documents for information and feedback | other | Ericsson |
S5-141-e AI: 5.3 |
withdrawn | [WTS] [JSN] | |||
S5-221495 | Rel-16 CR TS 32.422 Correct the value of Report Interval in NR for alignment | CR | China Telecom | 32.422 16.8.0 CR#391 catF | TEI16 | Rel-16 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221496 | Rel-17 CR TS 32.256 Clarify definition of AllowedValues | CR | Ericsson | 32.156 16.4.0 CR#40 catF | TEI17 | Rel-17 |
S5-141-e AI: 6.1 |
agreed | [WTS] [JSN] |
S5-221497 | Forge working procedure change in SA5 Working Procedures |
other revision of S5-221059 |
Nokia, Nokia Shanghai Bell |
S5-141-e AI: 5.1 |
agreed | [WTS] [JSN] | |||
S5-221498 | Updated SA5 working procedures | other | WG Chair |
S5-141-e AI: 5.1 |
approved | [WTS] [JSN] | |||
S5-221499 | Revised WID Rel-17 NSA_SBMA | WID revised | Ericsson | NSA_SBMA | Rel-17 |
S5-141-e AI: 6.4.19 |
agreed | [WTS] [JSN] | |
S5-221500 | Rel-18 work prioritization |
discussion revision of S5-221487 |
WG chair |
S5-141-e AI: 5.1 |
endorsed | [WTS] [JSN] | |||
S5-221501 | Reply LS to SA on energy efficiency as guiding principle for new solutions |
LS out LS is reply to S5-221483 source LS: SP-211621 LS To: SA revision of S5-221015 |
Orange |
S5-141-e AI: 5.3 |
approved | [WTS] [JSN] | |||
S5-221502 | Reply LS on Recommendation ITU-T M.3381 |
LS out LS is reply to S5-221479 source LS: SG2-LS224 LS To: ITU-T SG2 revision of S5-221016 |
Intel, NEC, Orange |
S5-141-e AI: 5.3 |
approved | [WTS] [JSN] | |||
S5-221503 | CR Rel-17 TS 28.533 Add 5G specification information |
CR revision of S5-221165 |
Huawei Technologies (Korea) | 28.533 17.1.0 CR#981 catF | TEI17 | Rel-17 |
S5-141-e AI: 6.1 |
agreed | [WTS] [JSN] |
S5-221504 | CR Rel-16 TS 32.103 Remove 5G specification information |
CR revision of S5-221167 |
Huawei Technologies (Korea) | 32.103 16.2.0 CR#331 catF | TEI16 | Rel-16 |
S5-141-e AI: 6.1 |
agreed | [WTS] [JSN] |
S5-221505 | Preparation of checking the Rel-17 OAM work progress |
discussion revision of S5-221194 |
SA5 Vice chair (Huawei) |
S5-141-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S5-221506 | New SID on Basic SBMA enabler enhancements |
SID new revision of S5-221239 |
Nokia, Nokia Shanghai Bell |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | |||
S5-221507 | New SID on Management Aspects of URLLC |
SID new revision of S5-221241 |
China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-221508 | New Rel-18 SID on alignment with GSMA OPG and ETSI MEC for Edge computing management |
SID new revision of S5-221242 |
Samsung Electronics Benelux BV | Rel-18 |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-221509 | Management Aspect of User Plane Enhancement |
SID new revision of S5-221265 |
CMCC | Rel-18 |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-221510 | New WID on enhancement of 5G+ NRM features |
WID new revision of S5-221303 |
Nokia, Nokia Shanghai Bell | Rel-18 |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-221511 | New SID Study on Management of Cloud Native Virtualized Network Functions |
SID new revision of S5-221329 |
China Mobile Com. Corporation | Rel-18 |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-221512 | New SID on Management Aspect Enhancement of 5G MOCN Network Sharing |
SID new revision of S5-221353 |
China Unicom | Rel-18 |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-221513 | New SID on intent-driven management for network slicing |
SID new revision of S5-221359 |
Ericsson Inc. |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | |||
S5-221514 | New SID on further Enhancements of Management of Trace/MDT |
SID new revision of S5-221422 |
Nokia, Nokia Shanghai Bell | Rel-18 |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-221515 | Input to draftCR TS 28.536 clean up stage 2 descriptions | other | Ericsson GmbH, Eurolab, Deutsche Telekom | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
approved | [WTS] [JSN] | |
S5-221516 | Update 5GC NRM for 5G_DDNMF |
CR revision of S5-221399 |
CATT | 28.541 17.5.0 CR#6741 catF | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221517 | Correct maximumDeviationHoTrigger |
CR revision of S5-221382 |
Ericsson France S.A.S | 28.541 17.5.0 CR#6332 catC | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
agreed | [WTS] [JSN] |
S5-221518 | Notification Subscription changes |
CR revision of S5-221064 |
Ericsson Hungary Ltd | 28.622 16.10.0 CR#1291 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221519 | Notification Subscription changes |
CR revision of S5-221027 |
Ericsson Hungary Ltd | 28.622 17.0.0 CR#1281 catA | eNRM | Rel-17 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221520 | Alarm Record changes |
CR revision of S5-221065 |
Ericsson Hungary Ltd | 28.622 16.10.0 CR#1301 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221521 | Alarm Record changes |
CR revision of S5-221026 |
Ericsson Hungary Ltd | 28.622 17.0.0 CR#1271 catA | eNRM | Rel-17 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221522 | Specifying multivalue attributes |
CR revision of S5-221025 |
Ericsson Hungary Ltd | 32.156 16.4.0 CR#391 catF | eNRM | Rel-16 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221523 | Rel-17 CR TS 32.422 Correct the value of Report Interval in NR for alignment |
CR revision of S5-221148 |
China Telecom Corporation Ltd. | 32.422 17.5.0 CR#3841 catA | TEI16 | Rel-17 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221524 | Rel-16 CR 32.422 Alignment of parameter names and clean up |
CR revision of S5-221411 |
Nokia, Nokia Shanghai Bell | 32.422 16.8.0 CR#3891 catF | 5GMDT | Rel-16 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221525 | Rel-17 CR 32.422 Alignment of parameter names and clean up |
CR revision of S5-221412 |
Nokia, Nokia Shanghai Bell | 32.422 17.5.0 CR#3901 catA | 5GMDT | Rel-17 |
S5-141-e AI: 6.3 |
agreed | [WTS] [JSN] |
S5-221526 | pCR 28.557 Add new NPN management related requirements |
pCR revision of S5-221038 |
TELEFONICA S.A. | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-221527 | pCR 28.557 Solution for management of SNPN |
pCR revision of S5-221082 |
Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-221528 | pCR 28.557 Update solution for NPN provisioning by a network slice of a PLMN |
pCR revision of S5-221083 |
Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-221529 | pCR 28.557 Solution for collecting UE related data |
pCR revision of S5-221085 |
Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-221530 | pCR 28.557 Use case of collecting UE related data |
pCR revision of S5-221086 |
Huawei | 28.557 1.2.0 | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] |
S5-221531 | Rel-17 CR 28.541 Update RANSliceSubnetProfile attributes |
CR revision of S5-221035 |
TELEFONICA S.A. | 28.541 17.5.0 CR#6451 catF | EMA5SLA | Rel-17 |
S5-141-e AI: 6.4.2 |
agreed | [WTS] [JSN] |
S5-221532 | Rel-17 CR 28.541 Update energy efficiency attribute |
CR revision of S5-221080 |
Huawei | 28.541 17.5.0 CR#6511 catF | EMA5SLA | Rel-17 |
S5-141-e AI: 6.4.2 |
agreed | [WTS] [JSN] |
S5-221533 | TS 28.541 Clean up of eMA5SLA |
CR revision of S5-221254 |
CMCC | 28.541 17.5.0 CR#6661 catF | EMA5SLA | Rel-17 |
S5-141-e AI: 6.4.2 |
agreed | [WTS] [JSN] |
S5-221534 | Add MDT reporting for NR |
CR revision of S5-221168 |
Ericsson LM | 32.422 17.5.0 CR#3861 catB | e_5GMDT | Rel-17 |
S5-141-e AI: 6.4.3 |
agreed | [WTS] [JSN] |
S5-221535 | Add MDT signalling activation and deactivation mechanisms in a split architecture for NR |
CR revision of S5-221170 |
Ericsson LM | 32.422 17.5.0 CR#3871 catB | e_5GMDT | Rel-17 |
S5-141-e AI: 6.4.3 |
agreed | [WTS] [JSN] |
S5-221536 | Add MDT management activation and deactivation mechanism in the case of split architecture for NR |
CR revision of S5-221172 |
Ericsson LM | 32.422 17.5.0 CR#3881 catB | e_5GMDT | Rel-17 |
S5-141-e AI: 6.4.3 |
agreed | [WTS] [JSN] |
S5-221537 | Discussion on RACH NSA measurements |
discussion revision of S5-221017 |
Nokia Solutions & Networks (I) | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
endorsed | [WTS] [JSN] | |
S5-221538 | Add Space Division Multiplexing PRB Usage for MIMO cell |
CR revision of S5-221058 |
CMCC, Huawei, ZTE | 28.552 17.5.0 CR#3411 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221539 | Rel-17 CR TS 28.552 Modify description of MIMO PRB usage for cell |
CR revision of S5-221236 |
China Unicom | 28.552 17.5.0 CR#3441 catF | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221540 | Rel-17 CR TS 28.552 Modify description of sampling occasion for scheduled layers |
CR revision of S5-221237 |
China Unicom | 28.552 17.5.0 CR#3451 catF | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221541 | Rel-17 CR TS 28.552 Updating packets based performance measurements |
CR revision of S5-221451 |
Harman GmbH | 28.552 17.5.0 CR#3611 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221542 | Rel-17 CR TS 28.554 Define Reliability KPI in 5G Network | CR | Harman GmbH | 28.554 17.5.0 CR#93 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221543 | CR Rel-17 28.552 Add measurements related to location context transfer for LMF |
CR revision of S5-221344 |
Intel | 28.552 17.5.0 CR#3531 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221544 | CR Rel-17 28.552 Add measurements related to location determination for LMF |
CR revision of S5-221346 |
Intel | 28.552 17.5.0 CR#3541 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221545 | Rel-17 CR TS 28.552 Adding new packets based performance measurements |
CR revision of S5-221450 |
Harman GmbH | 28.552 17.5.0 CR#3601 catB | ePM_KPI_5G | Rel-17 |
S5-141-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
S5-221546 | Update of Stage 2 / Stage 3 alignment principles in SA5 working procedures |
other revision of S5-221449 |
SA5 Chair, SA5 Vice chair (Huawei) |
S5-141-e AI: 5.1 |
endorsed | [WTS] [JSN] | |||
S5-221547 | Rel-17 Discussion paper on definition of tenant |
discussion revision of S5-221282 |
Ericsson España S.A. | Rel-17 |
S5-141-e AI: 5.2 |
endorsed | [WTS] [JSN] | ||
S5-221548 | Reply LS on slicing management aspects in relation to SEAL |
LS out LS is reply to S5-221476 LS To: SA6 revision of S5-221079 |
Huawei | Rel-17 |
S5-141-e AI: 5.3 |
approved | [WTS] [JSN] | ||
S5-221549 | Asynchronous operation NRM additions |
CR revision of S5-221023 |
Ericsson Hungary Ltd | 28.622 17.0.0 CR#1261 catC | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221550 | Asynchronous operation NRM additions - YANG Stage 3 |
CR revision of S5-221024 |
Ericsson Hungary Ltd | 28.623 17.0.0 CR#1441 catC | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221551 | Reply LS on network slice management service consumption |
LS out LS is reply to S5-221477 LS To: SA6 revision of S5-221373 revised to S5-221560 |
Alibaba Group | Rel-17 |
S5-141-e AI: 5.3 |
revised | [WTS] [JSN] | ||
S5-221552 | New WID on Network Slice Management Capability Exposure |
WID new revision of S5-221195 |
Alibaba Group | Rel-18 |
S5-141-e AI: 6.2 |
noted | [WTS] [JSN] | ||
S5-221553 | New SID on Fault Supervision Evolution |
SID new revision of S5-221203 |
China Mobile Com. Corporation;HUAWEI |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | |||
S5-221554 | New Rel-18 WID on enhanced Edge Computing Management |
WID new revision of S5-221300 |
Samsung Electronics Benelux BV | Rel-18 |
S5-141-e AI: 6.2 |
agreed | [WTS] [JSN] | ||
S5-221555 | NRM enhacements for SMFFunction |
CR revision of S5-221180 |
Nokia Germany | 28.541 17.5.0 CR#6581 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221556 | NRM enhancements for the SMFFunction (stage 3) |
CR revision of S5-221284 |
Nokia Germany | 28.541 17.5.0 CR#6701 catB | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221557 | Adding Signalling Based Activation for NR |
CR revision of S5-221042 |
Ericsson Limited | 28.405 17.0.0 CR#61 catB | eQoE | Rel-17 |
S5-141-e AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-221558 | Rel-17 CR TS 28.541 Add tenant IOC to support multiple tenant environment |
CR revision of S5-221161 |
Huawei | 28.541 17.5.0 CR#5384 catB | eMEMTANE | Rel-17 |
S5-141-e AI: 6.4.7 |
not pursued | [WTS] [JSN] |
S5-221559 | Rel-17 Input to DraftCR 28.537 Add requirements for context data |
other revision of S5-221362 |
Nokia, Nokia Shanghai ell | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
approved | [WTS] [JSN] | |
S5-221560 | Reply LS on network slice management service consumption |
LS out LS is reply to S5-221477 LS To: SA6 revision of S5-221551 |
Alibaba Group | Rel-17 |
S5-141-e AI: 5.3 |
approved | [WTS] [JSN] | ||
S5-221565 | pCR 28.538 Edge NRM Stage-3 | pCR | Samsung | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221566 | TS 28.541 Correct NR YAML in TS document | CR | Huawei | 28.541 17.5.0 CR#679 catF | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221567 | TS 28.541 Correct 5GC YAML in TS document | CR | Huawei | 28.541 17.5.0 CR#680 catF | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221568 | TS 28.541 Correct NetworkSlicing YAML in TS document | CR | Huawei | 28.541 17.5.0 CR#681 catF | adNRM | Rel-17 |
S5-141-e AI: 6.4.4 |
agreed | [WTS] [JSN] |
S5-221569 | Resolving the acquisition of operator’s MIB EN |
pCR revision of S5-221199 |
Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221570 | pCR TR 28.824 add solution on eMnS discovery service |
pCR revision of S5-221258 |
AsiaInfo, Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-221571 | pCR TR 28.824 add procedure for exposed MnS registration |
pCR revision of S5-221259 |
AsiaInfo, Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
noted | [WTS] [JSN] |
S5-221572 | exception sheet for eMDAS | WI exception request | Intel | eMDAS |
S5-141-e AI: 6.4.15 |
agreed | [WTS] [JSN] | ||
S5-221573 | presentation sheet for TS 28.104 | TS or TR cover | Intel | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] | |
S5-221574 | presentation sheet for TS 28.105 | TS or TR cover | Intel | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] | |
S5-221575 | pCR TS 28.312 Update RadioNetworkExpectation |
pCR revision of S5-221134 |
Huawei, China Mobile, China Unicom,, Deutsche Telekom | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-221576 | Revised WID for MADCOL | WID revised | Nokia | MADCOL | Rel-17 |
S5-141-e AI: 6.4.8 |
agreed | [WTS] [JSN] | |
S5-221577 | Exception Sheet for MADCOL | WI exception request | Nokia | MADCOL |
S5-141-e AI: 6.4.8 |
agreed | [WTS] [JSN] | ||
S5-221578 | Rel-17 CR 28.541 Add Stage 3 solutions to support ECM | CR | Intel | 28.541 17.5.0 CR#682 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
agreed | [WTS] [JSN] |
S5-221580 | pCR TS 28.312 Align the description for general concept of intent content |
pCR revision of S5-221132 |
Huawei,Nokia, Deutsche Telekom,AsiaInfo | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-221581 | pCR TS 28.312 Update intent information model |
pCR revision of S5-221133 |
Huawei, China Mobile, China Unicom, Nokia, Deutsche Telekom,AsiaInfo | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-221582 | pCR TS 28.312 Clean up on procedures |
pCR revision of S5-221135 |
Huawei, Deutsche Telekom | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-221583 | Presentation sheet of TS 28.312 for SA Information and Approval |
TS or TR cover revision of S5-221154 |
Huawei | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] | |
S5-221584 | pCR TS 28.312 Add feasibility check to the procedures for intent management |
pCR revision of S5-221078 |
China Mobile Com. Corporation | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-221585 | pCR TS 28.312 Rapporteur clean up |
pCR revision of S5-221131 |
Huawei | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-221586 | Editorial on the definition of AssuranceClosedControlLoop |
CR revision of S5-221048 |
Nokia Germany | 28.536 17.1.0 CR#371 catF | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
agreed | [WTS] [JSN] |
S5-221587 | Fixing the "S" qualifier |
CR revision of S5-221197 |
Nokia Germany | 28.536 17.1.0 CR#381 catF | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
agreed | [WTS] [JSN] |
S5-221588 | Input to draftCR TS 28.536 clean up stage 2 descriptions |
CR revision of S5-221387 |
Ericsson GmbH, Eurolab, Deutsche Telekom | 28.536 17.1.0 CR#411 catC | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
not pursued | [WTS] [JSN] |
S5-221589 | Discussion paper on eCosla completion |
discussion revision of S5-221389 |
Ericsson GmbH, Eurolab |
S5-141-e AI: 6.4. |
endorsed | [WTS] [JSN] | |||
S5-221590 | Revised WID on Enhanced Closed loop SLS assurance |
WID revised revision of S5-221391 |
Ericsson GmbH, Eurolab | eCOSLA | Rel-17 |
S5-141-e AI: 6.4. |
agreed | [WTS] [JSN] | |
S5-221591 | Rel-17 CR 28.313 Add information in the PCI configuration notification |
CR revision of S5-221074 |
Intel | 28.313 17.3.0 CR#451 catB | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
agreed | [WTS] [JSN] |
S5-221592 | Rel-17 CR 28.313 Add information in the C-SON notification |
CR revision of S5-221075 |
Intel | 28.313 17.3.0 CR#461 catB | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
agreed | [WTS] [JSN] |
S5-221593 | Rel-17 CR 28.541 Add C-SON CCO NRM model stage3 |
CR revision of S5-221192 |
Huawei | 28.541 17.5.0 CR#6601 catB | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
agreed | [WTS] [JSN] |
S5-221594 | Rel-17 CR 28.541 Add C-SON CCO NRM model stage2 |
CR revision of S5-221191 |
Huawei | 28.541 17.5.0 CR#6591 catB | eSON_5G | Rel-17 |
S5-141-e AI: 6.4.11 |
agreed | [WTS] [JSN] |
S5-221595 | Rel-17 CR 28.552 Conditional handover measurements |
CR revision of S5-221377 |
Ericsson France S.A.S | 28.552 17.5.0 CR#3571 catB | E_HOO | Rel-17 |
S5-141-e AI: 6.4.12 |
agreed | [WTS] [JSN] |
S5-221596 | Rel-17 CR 28.554 Add KPI for HO success rate for all handover types |
CR revision of S5-221378 |
Ericsson France S.A.S | 28.554 17.5.0 CR#921 catB | E_HOO | Rel-17 |
S5-141-e AI: 6.4.12 |
agreed | [WTS] [JSN] |
S5-221597 | Rel-17 CR 28.622 Add support for discovery of managed entities |
CR revision of S5-221209 |
Huawei | 28.622 17.0.0 CR#1331 catB | 5GDMS | Rel-17 |
S5-141-e AI: 6.4.13 |
agreed | [WTS] [JSN] |
S5-221598 | Rel-17 CR 28.623 Add support for discovery of managed entities |
CR revision of S5-221210 |
Huawei | 28.623 17.0.0 CR#1471 catB | 5GDMS | Rel-17 |
S5-141-e AI: 6.4.13 |
agreed | [WTS] [JSN] |
S5-221599 | Rel-17 CR TS 28.541 Alignment on NR NRM for MOCN network sharing |
CR revision of S5-221136 |
Huawei,Orange,China Mobile,China Unicom,China Telecom, Deutsche Telekom,Ericsson,Telefonica | 28.541 17.5.0 CR#6521 catF | MANS | Rel-17 |
S5-141-e AI: 6.4.14 |
agreed | [WTS] [JSN] |
S5-221600 | Rel-17 CR TS 32.130 Add solution description for the requirements for the management of the shared NG-RAN NE(s) in MOCN network sharing scenario |
CR revision of S5-221139 |
Huawei,Orange,China Mobile, China Unicom,China Telecom, Deutsche Telekom,Ericsson,Telefonica | 32.13 17.3.0 CR#191 catB | MANS | Rel-17 |
S5-141-e AI: 6.4.14 |
agreed | [WTS] [JSN] |
S5-221601 | Rel-17 CR TS 28.541 Add administrativeState attribute in OperatorNRCellDU |
CR revision of S5-221171 |
ZTE Corporation, China Unicom | 28.541 17.5.0 CR#6531 catB | MANS | Rel-17 |
S5-141-e AI: 6.4.14 |
agreed | [WTS] [JSN] |
S5-221602 | Including individual PM, KPI, trace and QoE statistics and predictions as additional MDA types |
pCR revision of S5-221046 |
Nokia Germany | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221603 | Add MDA types |
pCR revision of S5-221302 |
Nokia Germany | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221604 | CR Rel-17 28.622 Enhance NRM with geographical information supporting MDA |
CR revision of S5-221076 |
Intel | 28.622 17.0.0 CR#1311 catB | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
agreed | [WTS] [JSN] |
S5-221605 | CR Rel-17 28.623 Enhance NRM with geographical information supporting MDA |
CR revision of S5-221077 |
Intel | 28.623 17.0.0 CR#1461 catB | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
agreed | [WTS] [JSN] |
S5-221606 | pCR TS 28.104 add coverage issue analytics output area definition--stage2 |
pCR revision of S5-221183 |
Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221607 | pCR 28.104 Update MDA service framework and data definitions for coverage problem analysis |
pCR revision of S5-221341 |
Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221608 | CR Rel-17 28.552 Add measurements to support coverage problem analysis for MDA |
CR revision of S5-221342 |
Intel | 28.552 17.5.0 CR#3521 catB | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
agreed | [WTS] [JSN] |
S5-221609 | pCR TS28.104 Add E2E latency analysis solution |
pCR revision of S5-221140 |
Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221610 | pCR TS28.104 Add network slice throughput analysis solution |
pCR revision of S5-221144 |
Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221611 | pCR TS28.104 Add network slice load analysis solution |
pCR revision of S5-221146 |
Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221612 | pCR 28.104 Add MDA capability for MDA assisted energy saving analysis |
pCR revision of S5-221251 |
China Telecom Corporation Ltd. | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221613 | pCR 28.104 Update NRM for MDA request |
pCR revision of S5-221339 |
Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221614 | pCR TS28.104 Add the requirements for ML model training for MDA |
pCR revision of S5-221190 |
Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221615 | Add MDA context |
pCR revision of S5-221299 |
Nokia Germany | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221616 | pCR 28.105 Add scope |
pCR revision of S5-221332 |
Intel, NEC | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221617 | pCR 28.105 Add overview |
pCR revision of S5-221333 |
Intel, NEC | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221618 | pCR 28.105 Add service framework for AI-ML model training |
pCR revision of S5-221334 |
Intel, NEC | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221619 | pCR 28.104 Move out ML model training part to TS 28.105 |
pCR revision of S5-221338 |
Intel | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221620 | pCR 28.105 Add NRMs for AI-ML model training |
pCR revision of S5-221336 |
Intel | 28.105 0.0.0 | eMDAS | Rel-18 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221621 | pCR TS 28.104 add MDA related service components |
pCR revision of S5-221189 |
Huawei | 28.104 17.3.0 | TEI17_SAPES | Rel-17 |
S5-141-e AI: 6.4.15 |
noted | [WTS] [JSN] |
S5-221622 | Rel-17 CR 28.532 Add jobId to FileInfo |
CR revision of S5-221240 |
Nokia, Nokia Shanghai Bell | 28.532 16.10.0 CR#1961 catB | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
agreed | [WTS] [JSN] |
S5-221623 | Rel-17 CR 28.622 Add attribute to configure an identifier of a TraceJob |
CR revision of S5-221296 |
Nokia, Nokia Shanghai Bell | 28.622 17.0.0 CR#1341 catB | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
agreed | [WTS] [JSN] |
S5-221624 | pCR 28.538 add fault supervision procedures |
pCR revision of S5-221067 |
Intel | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221625 | pCR 28.538 add provisioning use cases |
pCR revision of S5-221068 |
Intel | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221626 | pCR 28.538 add provisioning procedures |
pCR revision of S5-221069 |
Intel | 28.538 0.4.0 | IDMS_MN, ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221627 | Rel-17 CR 28.541 Add Stage 2 solutions to support ECM |
CR revision of S5-221073 |
Intel | 28.541 17.5.0 CR#6501 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
agreed | [WTS] [JSN] |
S5-221628 | pCR 28.538 add relevent NRM changes to support ECM use cases |
pCR revision of S5-221070 |
Intel | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221629 | pCR 28.538 adding EDN IOC |
pCR revision of S5-221224 |
Huawei | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221630 | pCR 28.538 update Edge NRM figure |
pCR revision of S5-221228 |
Huawei | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221631 | pCR 28.538 EASFunction Definition |
pCR revision of S5-221288 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221632 | pCR 28.538 EESFunction definition |
pCR revision of S5-221289 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221633 | pCR 28.538 ECSFunction Definition |
pCR revision of S5-221291 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221634 | pCR 28.538 ECS Performance MnS |
pCR revision of S5-221283 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221635 | pCR 28.538 ECS Performance assurance |
pCR revision of S5-221285 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221636 | pCR 28.538 EES Performance MnS |
pCR revision of S5-221286 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221637 | pCR 28.538 EES Performance assurance |
pCR revision of S5-221287 revised to S5-221739 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
revised | [WTS] [JSN] |
S5-221638 | Rel-17 CR 28.552 performance measurements for ECS - EES Registration |
CR revision of S5-221272 |
Samsung Electronics Benelux BV | 28.552 17.5.0 CR#3481 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
agreed | [WTS] [JSN] |
S5-221639 | Rel-17 CR 28.552 performance measurements for ECS - Service Provisioning |
CR revision of S5-221275 |
Samsung Electronics Benelux BV | 28.522 16.0.0 CR#61 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
agreed | [WTS] [JSN] |
S5-221640 | Discussion paper on Charging Solution for Roaming with Local Breakout | discussion | Vodafone Italia SpA |
S5-141-e AI: 7.5.4 |
noted | [WTS] [JSN] | |||
S5-221641 | New WID on 5G charging for additional roaming scenarios and actors | WID new | Vodafone Italia SpA, MATRIXX Software |
S5-141-e AI: 7.5.4 |
agreed | [WTS] [JSN] | |||
S5-221642 | CH agenda and time plan |
agenda revision of S5-221008 |
CH Chair (MATRIXX Software) |
S5-141-e AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-221643 | Draft TS 32.257 | draft TR | Intel Sweden AB | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
approved | [WTS] [JSN] | |
S5-221644 | Draft TR 28.822 | draft TR | Huawei | FS_5GLAN_CH | Rel-17 |
S5-141-e AI: 7.5.1 |
approved | [WTS] [JSN] | |
S5-221645 | Draft TR 32.847 | draft TR | MATRIXX Software | FS_NETSLICE_CH_Ph2 | Rel-17 |
S5-141-e AI: 7.5.2 |
approved | [WTS] [JSN] | |
S5-221646 | Draft TR 28.826 | draft TR | Ericsson LM | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
approved | [WTS] [JSN] | |
S5-221647 | Draft TR 28.827 | draft TR | Ericsson | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] | |
S5-221648 | Work Item Exception for Charging aspects of Edge Computing | WI exception request | Intel Sweden AB | EDGE_CH |
S5-141-e AI: 7.4.2 |
agreed | [WTS] [JSN] | ||
S5-221649 | Rel-17 CR 32.291 Addition of IMS converged charging yaml |
CR revision of S5-221311 |
Ericsson LM | 32.291 17.1.0 CR#3751 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-221650 | Rel-17 CR 32.291 Addition of MMTel converged charging yaml |
CR revision of S5-221313 |
Ericsson LM | 32.291 17.1.0 CR#3761 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-221651 | Rel-17 CR 32.291 Addition of IMS converged charging announcement yaml |
CR revision of S5-221315 |
Ericsson LM | 32.291 17.1.0 CR#3771 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-221652 | Adding basic principles for 5G ProSe convergent charging |
CR revision of S5-221397 |
CATT | 32.277 17.0.0 CR#371 catB | 5G_ProSe | Rel-17 |
S5-141-e AI: 7.4.4 |
agreed | [WTS] [JSN] |
S5-221653 | Adding message flows for 5G ProSe Direct Discovery converged charging |
CR revision of S5-221398 |
CATT | 32.277 17.0.0 CR#381 catB | 5G_ProSe | Rel-17 |
S5-141-e AI: 7.4.4 |
agreed | [WTS] [JSN] |
S5-221654 | Rel-17 pCR 32.847 Conclusions for KI#3 |
pCR revision of S5-221229 |
MATRIXX Software | 32.847 1.0.0 | FS_NETSLICE_CH_Ph2 | Rel-17 |
S5-141-e AI: 7.5.2 |
approved | [WTS] [JSN] |
S5-221655 | New WID on Network Slice charging based on 5G data connectivity |
WID new revision of S5-221231 |
MATRIXX Software | Rel-17 |
S5-141-e AI: 7.2 |
agreed | [WTS] [JSN] | ||
S5-221656 | TR 28.827, Adding Conclusions |
pCR revision of S5-221484 |
Vodafone Italia SpA,MATRIXX Software | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-221657 | LSout on Enhancement on Charging Identifier Uniqueness Mechanism |
LS out LS To: CT4 revision of S5-221094 |
Huawei | FS_5GLAN_CH | Rel-17 |
S5-141-e AI: 7.3 |
approved | [WTS] [JSN] | |
S5-221658 | pCR 32.257 Add principles and scenarios for edge enabling infrastructure resource usage charging |
pCR revision of S5-221350 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-221659 | pCR 32.257 Add charging information definition for edge enabling infrastructure resource usage charging |
pCR revision of S5-221351 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-221660 | pCR 32.257 Add principles and scenarios for edge application server deployment charging |
pCR revision of S5-221352 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-221661 | pCR 32.257 Add principles and scenarios for edge enabling services charging |
pCR revision of S5-221355 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-221662 | Update general charging principles for 5G ProSe |
CR revision of S5-221396 |
CATT | 32.277 17.0.0 CR#361 catB | 5G_ProSe | Rel-17 |
S5-141-e AI: 7.4.4 |
agreed | [WTS] [JSN] |
S5-221663 | pCR 32.257 Add charging information definition for edge application server deployment charging |
pCR revision of S5-221354 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-221664 | Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in charging procedure |
CR revision of S5-221125 |
Huawei | 32.255 17.4.0 CR#3611 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
agreed | [WTS] [JSN] |
S5-221665 | Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in EPC interworking procedure |
CR revision of S5-221126 |
Huawei | 32.255 17.4.0 CR#3621 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
agreed | [WTS] [JSN] |
S5-221666 | Rel-17 CR 32.255 Add charging enhancements of 5GS CIoT in home-routed roaming procedure |
CR revision of S5-221127 |
Huawei | 32.255 17.4.0 CR#3631 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
agreed | [WTS] [JSN] |
S5-221667 | Rel-17 CR 32.255 Add charging information of 5GS CIoT |
CR revision of S5-221128 |
Huawei | 32.255 17.4.0 CR#3641 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
agreed | [WTS] [JSN] |
S5-221668 | Rel-17 CR 32.255 Add charging requirements of 5GS CIoT |
CR revision of S5-221129 |
Huawei | 32.255 17.4.0 CR#3651 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
agreed | [WTS] [JSN] |
S5-221669 | Rel-17 CR TS 32.291 Add charging information of 5GS CIoT |
CR revision of S5-221130 |
Huawei | 32.291 17.1.0 CR#3681 catB | 5G_CIoT_CH | Rel-17 |
S5-141-e AI: 7.4.6 |
agreed | [WTS] [JSN] |
S5-221670 | Work Item Exception for 5G Charging for Local breakout roaming of data connectivity | WI exception request | Vodafone | DUMMY |
S5-141-e AI: 7.5.4 |
agreed | [WTS] [JSN] | ||
S5-221671 | Rel-17 CR TS 32.240 Charging architecture for Local Breakout | CR | Vodafone | 32.24 17.4.0 CR#439 catB | DUMMY | Rel-17 |
S5-141-e AI: 7.5.4 |
agreed | [WTS] [JSN] |
S5-221672 | Revised SID on 5G roaming charging architecture for wholesale and retail scenarios | SID revised | Ericsson LM | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
agreed | [WTS] [JSN] | |
S5-221673 | Presentation of TR 28.827 for Information | TS or TR cover | Ericsson LM | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] | |
S5-221674 | Rel-17 CR 32.255 Introduction of Annex on Network Slice charging |
CR revision of S5-221232 |
MATRIXX Software | 32.255 17.4.0 CR#3661 catB | DUMMY | Rel-17 |
S5-141-e AI: 7.2 |
agreed | [WTS] [JSN] |
S5-221675 | Presentation of TS 32.257 for Information | TS or TR cover | Intel Sweden AB | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
approved | [WTS] [JSN] | |
S5-221676 | Update high level ProSe architecture |
CR revision of S5-221395 |
CATT | 32.277 17.0.0 CR#351 catF | 5G_ProSe | Rel-17 |
S5-141-e AI: 7.4.4 |
agreed | [WTS] [JSN] |
S5-221677 | Rel-16 CR 32.240 Correction on charging architecture for management domain |
CR revision of S5-221020 |
Nokia, MATRIXX Software | 32.24 16.4.0 CR#4351 catF | 5GS_NSMCH | Rel-16 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221678 | Rel-17 CR 32.240 Correction on charging architecture for management domain |
CR revision of S5-221028 |
Nokia, MATRIXX Software | 32.24 17.4.0 CR#4361 catA | 5GS_NSMCH | Rel-17 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221679 | Rel-17 pCR 28.827 Adding use case and solution for clause 7.6 |
pCR revision of S5-221326 |
Ericsson LM | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-221680 | LS on 3GPP SA5 work on 5G network energy efficiency and energy saving |
LS out LS To: GSMA, NGMN, ITU-T SG5, ETSI TC EE, ETSI ISG NFV revision of S5-221014 |
Orange |
S5-141-e AI: 5.3 |
approved | [WTS] [JSN] | |||
S5-221681 | Rel-17 pCR 28.827 Corrections to clause 7.1 |
pCR revision of S5-221321 |
Ericsson LM | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-221682 | Rel-17 pCR 28.826 Restructuring clauses 5.3 to 5.5 |
pCR revision of S5-221316 |
Ericsson LM | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-221683 | Rel-17 CR 32.291 Correcting response code 2xx |
CR revision of S5-221304 |
Ericsson LM | 32.291 17.1.0 CR#3691 catF | TEI17 | Rel-17 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221684 | Rel-17 CR 32.291 Correcting response code 4xx |
CR revision of S5-221306 |
Ericsson LM | 32.291 17.1.0 CR#3711 catF | TEI17 | Rel-17 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221685 | Rel-17 CR 32.255 Correcting charging rule base name |
CR revision of S5-221308 |
Ericsson LM | 32.255 17.4.1 CR#3671 catF | TEI17 | Rel-17 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221686 | Rel-17 CR 32.298 Addition of IMS converged charging ASN.1 |
CR revision of S5-221312 |
Ericsson LM | 32.298 17.1.0 CR#8871 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-221687 | Rel-17 CR 32.298 Addition of MMTel converged charging ASN.1 |
CR revision of S5-221314 |
Ericsson LM | 32.298 17.1.0 CR#8881 catB | 5GSIMSCH | Rel-17 |
S5-141-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S5-221688 | pCR 32.257 Add charging information 5GS usage charging for edge enabling |
pCR revision of S5-221348 |
Intel | 32.257 0.2.0 | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
approved | [WTS] [JSN] |
S5-221689 | Rel-17 CR 32.240 Addition of the 5G LAN-type service Description |
CR revision of S5-221098 |
Huawei | 32.24 17.4.0 CR#4371 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
agreed | [WTS] [JSN] |
S5-221705 | Rel-17 CR 28.552 performance measurements for EES - EAS Discovery |
CR revision of S5-221276 |
Samsung Electronics Benelux BV | 28.552 17.5.0 CR#3491 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
agreed | [WTS] [JSN] |
S5-221706 | Rel-17 CR 28.552 performance measurements for EES - EEC Registration |
CR revision of S5-221278 |
Samsung Electronics Benelux BV | 28.552 17.5.0 CR#3501 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
agreed | [WTS] [JSN] |
S5-221707 | Rel-17 CR 28.552 performance measurements for EES - EAS Registration |
CR revision of S5-221279 |
Samsung Electronics Benelux BV | 28.552 17.5.0 CR#3511 catB | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
agreed | [WTS] [JSN] |
S5-221708 | pCR 28.538 EES LCM procedure |
pCR revision of S5-221290 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221709 | Latest draft TS 28.315 | draft TS | Ericsson | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] | |
S5-221710 | Rel-17 CR 28.531 Fixing Network slice and network slice subnet provisioning management service - profiles not convert to IOC - Stage 3 |
CR revision of S5-221270 |
Samsung Electronics Benelux BV | 28.531 17.2.0 CR#1041 catF | eNETSLICE_PRO | Rel-17 |
S5-141-e AI: 6.4.21 |
agreed | [WTS] [JSN] |
S5-221711 | WI Exception for eNETSLICE_PRO |
WI exception request revision of S5-221245 |
Samsung Electronics Benelux BV | NETSLICE-PRO_NS | Rel-17 |
S5-141-e AI: 6.4.21 |
agreed | [WTS] [JSN] | |
S5-221712 | pCR TS28.104 Add service experience analysis solution |
pCR revision of S5-221142 |
Huawei | 28.104 0.3.0 | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] |
S5-221713 | pCR 28.824 Skeleton restructuring proposal |
pCR revision of S5-221089 |
Huawei, Alibaba | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-221714 | Key issue and solution on exposure without going through BSS |
pCR revision of S5-221196 |
Alibaba Group | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-221715 | pCR 28.819 update notified of new NF version scenario |
pCR revision of S5-221215 |
Huawei | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221716 | pCR 28.819 CI-CD process updates |
pCR revision of S5-221213 |
Huawei | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221717 | pCR 28.819 Update Scope |
pCR revision of S5-221438 |
Lenovo, Motorola mobility, CMCC | 28.819 0.4.0 | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] |
S5-221719 | pCR 28.824 Clarification on access to exposed MnS |
pCR revision of S5-221216 |
Huawei | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-221720 | CR Rel-17 32.255 Add charging information for 5GS usage for Edge Computing |
CR revision of S5-221349 |
Intel | 32.255 17.4.0 CR#3681 catB | EDGE_CH | Rel-17 |
S5-141-e AI: 7.4.2 |
agreed | [WTS] [JSN] |
S5-221721 | Rel-17 CR 32.255 Add charging requirement to support NR RedCap |
CR revision of S5-221447 |
China Mobile Com. Corporation | 32.255 17.4.0 CR#3691 catB | ARCH_NR_REDCAP | Rel-17 |
S5-141-e AI: 7.4.3 |
agreed | [WTS] [JSN] |
S5-221722 | Work Item Exception for Charging Aspects of 5G LAN VN Group | WI exception request | Huawei | 5GLAN_CH |
S5-141-e AI: 7.4.5 |
agreed | [WTS] [JSN] | ||
S5-221723 | Revised WID Charging aspects of 5G LAN VN Group | WID revised | Huawei | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
agreed | [WTS] [JSN] | |
S5-221724 | Rel-17 CR 32.255 Clarification on the 5G LAN type service charging |
CR revision of S5-221100 |
Huawei | 32.255 17.4.0 CR#3541 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
agreed | [WTS] [JSN] |
S5-221725 | Rel-17 CR 32.291 Additional charging information for the 5G LAN communication |
CR revision of S5-221102 |
Huawei | 32.291 17.1.0 CR#3601 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
agreed | [WTS] [JSN] |
S5-221726 | Rel-17 pCR 28.826 Adding use case for operator defined trigger |
pCR revision of S5-221318 |
Ericsson LM | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-221727 | Rel-17 pCR 28.822 Correction on the solution and conclusion for Topic 4 |
pCR revision of S5-221096 |
Huawei | 28.822 1.0.0 | FS_5GLAN_CH | Rel-17 |
S5-141-e AI: 7.5.1 |
approved | [WTS] [JSN] |
S5-221728 | Rel-17 CR 32.255 Additional charging information for the 5G LAN charging |
CR revision of S5-221101 |
Huawei | 32.255 17.4.0 CR#3551 catB | 5GLAN_CH | Rel-17 |
S5-141-e AI: 7.4.5 |
agreed | [WTS] [JSN] |
S5-221729 | Rel-17 pCR 28.827 Addition of the soultion for the Roaming Charging Profile |
pCR revision of S5-221123 |
Huawei | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-221730 | Rel-16 CR 32.291 Extensibility Mechanisms for charging |
CR revision of S5-221118 |
Huawei | 32.291 16.10.0 CR#3661 catF | TEI16 | Rel-16 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221731 | Rel-17 CR 32.291 Extensibility Mechanisms for charging |
CR revision of S5-221119 |
Huawei | 32.291 17.1.0 CR#3671 catA | TEI16 | Rel-17 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221732 | Rel-17 pCR 28.827 Clarification on the Roaming Charging Profile |
pCR revision of S5-221124 |
Huawei | 28.827 0.3.0 | FS_CHROAM | Rel-17 |
S5-141-e AI: 7.5.4 |
approved | [WTS] [JSN] |
S5-221733 | Work Item Exception for Charging aspects of Architecture Enhancement for NR Reduced Capability Devices | WI exception request | China Mobile Com. Corporation | ARCH_NR_REDCAP |
S5-141-e AI: 7.4.3 |
agreed | [WTS] [JSN] | ||
S5-221734 | Work Item Exception for Charging aspects of Proximity-based Services in 5GS | WI exception request | CATT | 5G_ProSe |
S5-141-e AI: 7.4.4 |
agreed | [WTS] [JSN] | ||
S5-221735 | Revised WID Charging aspects of Architecture Enhancement for NR Reduced Capability Devices | WID revised | CMCC | ARCH_NR_REDCAP | Rel-17 |
S5-141-e AI: 7.4.3 |
agreed | [WTS] [JSN] | |
S5-221736 | Rel-17 pCR 28.826 Adding use case for cancel failed event |
pCR revision of S5-221320 |
Ericsson LM | 28.826 0.2.0 | FS_NCHF_Ph2 | Rel-17 |
S5-141-e AI: 7.5.3 |
approved | [WTS] [JSN] |
S5-221737 | Rel-17 CR 32.291 Correct the Open API | CR | Huawei | 32.291 17.1.0 CR#378 catF | TEI17 | Rel-17 |
S5-141-e AI: 7.3 |
agreed | [WTS] [JSN] |
S5-221738 | Revised work item on management of the enhanced tenant concept |
WID revised revision of S5-221223 |
Huawei | eMEMTANE | Rel-17 |
S5-141-e AI: 6.4.7 |
agreed | [WTS] [JSN] | |
S5-221739 | pCR 28.538 EES Performance assurance |
pCR revision of S5-221637 |
Samsung Electronics Benelux BV | 28.538 0.4.0 | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] |
S5-221740 | SID revised was SP-210131 SID on network slice management capability exposure |
SID revised revision of S5-221230 |
Alibaba Group | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
agreed | [WTS] [JSN] | |
S5-221741 | Latest draft TS 28.105 | draft TS | Intel | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] | |
S5-221742 | Add solution for product and service order procedures to clause 7 |
pCR revision of S5-221423 |
Ericsson GmbH, Eurolab | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-221743 | Update procedure and add solution for product on-boarding |
pCR revision of S5-221430 |
Ericsson GmbH, Eurolab | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-221744 | pCR 28.824 Remove EN in 5.4 |
pCR revision of S5-221432 |
Lenovo, Motorola Mobility | 28.824 0.4.0 | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
approved | [WTS] [JSN] |
S5-221745 | DraftCR for FIMA TS 28.622 | draftCR | Nokia | FIMA | Rel-17 |
S5-141-e AI: 6.4. |
approved | [WTS] [JSN] | |
S5-221746 | Latest draft TS 28.557 | draft TR | Huawei | OAM_NPN | Rel-17 |
S5-141-e AI: 6.4.1 |
approved | [WTS] [JSN] | |
S5-221747 | Latest draft TS 28.312 | draft TS | Huawei | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] | |
S5-221748 | Latest draft TS 28.104 | draft TS | Intel | eMDAS | Rel-17 |
S5-141-e AI: 6.4.15 |
approved | [WTS] [JSN] | |
S5-221749 | Latest draft TS 28.314 | draft TS | Ericsson | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] | |
S5-221750 | Latest draft TS 28.316 | draft TS | Ericsson | PACMAN | Rel-17 |
S5-141-e AI: 6.4.16 |
approved | [WTS] [JSN] | |
S5-221751 | Latest draft TS 28.538 | draft TS | Samsung | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] | |
S5-221752 | Latest draft TR 28.824 | draft TR | Alibaba | FS_NSCE | Rel-17 |
S5-141-e AI: 6.5.2 |
approved | [WTS] [JSN] | |
S5-221753 | Latest draft TR 28.819 | draft TR | Lenovo | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
approved | [WTS] [JSN] | |
S5-221754 | pCR 28.312 ServiceDeploymentExpectation definition |
pCR revision of S5-221384 |
Samsung Electronics Benelux BV | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-221755 | pCR TS 28.312 update clause 4.2.2 and clause 6.3.3 |
pCR revision of S5-221261 |
AsiaInfo | 28.312 0.7.0 | IDMS_MN | Rel-17 |
S5-141-e AI: 6.4.9 |
approved | [WTS] [JSN] |
S5-221756 | MRO additions for CHO and DAPS handover | CR | Ericsson France | 28.313 17.3.0 CR#47 catC | E_HOO | Rel-17 |
S5-141-e AI: 6.4.12 |
agreed | [WTS] [JSN] |
S5-221757 | Rel-17 Input to DraftCR 28.622 Add file download control NRM fragment |
other revision of S5-221330 |
Ericsson LM | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
approved | [WTS] [JSN] | |
S5-221758 | Rel-17 CR 28.623 Add file download NRM fragment (OpenAPI definitions) |
CR revision of S5-221248 |
Nokia, Nokia Shanghai Bell | 28.623 17.0.0 CR#1491 catB | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
agreed | [WTS] [JSN] |
S5-221759 | Input to DraftCR Add file download NRM fragment, YANG |
other revision of S5-221371 |
Ericsson LM | FIMA |
S5-141-e AI: 6.4.17 |
approved | [WTS] [JSN] | ||
S5-221760 | CR 28.622 Add stage2 definition for file management | CR | Nokia | 28.622 17.0.0 CR#147 catB | FIMA | Rel-17 |
S5-141-e AI: 6.4.17 |
agreed | [WTS] [JSN] |
S5-221761 | Exception sheet for FIMA | WI exception request | Nokia | FIMA |
S5-141-e AI: 6.4.17 |
withdrawn | [WTS] [JSN] | ||
S5-221762 | Presentation sheet for approval to TS 28.538 |
TS or TR cover revision of S5-221327 |
Samsung Electronics Benelux BV | ECM | Rel-17 |
S5-141-e AI: 6.4.18 |
approved | [WTS] [JSN] | |
S5-221763 | Exception sheet for eQoE | WI exception request | Ericsson | eQoE |
S5-141-e AI: 6.4.5 |
agreed | [WTS] [JSN] | ||
S5-221764 | Exception Sheet for IDMS_MN | WI exception request | Huawei | IDMS_MN |
S5-141-e AI: 6.4.9 |
agreed | [WTS] [JSN] | ||
S5-221765 | Exception Sheet for eCOSLA | WI exception request | Ericsson | eCOSLA |
S5-141-e AI: 6.4. |
agreed | [WTS] [JSN] | ||
S5-221766 | Exception Sheet for MSAC | WI exception request | Nokia | MSAC |
S5-141-e AI: 6.4. |
agreed | [WTS] [JSN] | ||
S5-221767 | Revised SID for FS_CICDNS | SID revised | Lenovo, Motorola Mobility, CMCC | FS_CICDNS | Rel-17 |
S5-141-e AI: 6.5.3 |
agreed | [WTS] [JSN] |
747 documents (1.1190071105957 seconds)