Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-216000 Agenda agenda WG Chair S5-140-e

AI: 2

approved [WTS] [JSN]
S5-216001 Report from last SA5 meeting report

revised to S5-216336

MCC S5-140-e

AI: 4.1

revised [WTS] [JSN]
S5-216002 e-meeting process discussion WG Chair S5-140-e

AI: 5.1

noted [WTS] [JSN]
S5-216003 Post e-meeting email approval status other WG Chair S5-140-e

AI: 5.1

available [WTS] [JSN]
S5-216004 OAM&P action list other WG Vice Chair (Huawei) S5-140-e

AI: 6.1

noted [WTS] [JSN]
S5-216005 agenda_with_Tdocs_sequence_proposal_OAM agenda WG Vice Chair (Huawei) S5-140-e

AI: 6.1

noted [WTS] [JSN]
S5-216006 OAM Exec Report report WG Vice Chair (Huawei) S5-140-e

AI: 6.1

noted [WTS] [JSN]
S5-216007 OAM Chair notes and conclusions report WG Chair S5-140-e

AI: 6.1

noted [WTS] [JSN]
S5-216008 CH agenda and time plan agenda

revised to S5-216483

WG vice Chair (Matrixx) S5-140-e

AI: 7.1

revised [WTS] [JSN]
S5-216009 Charging exec report report WG vice Chair (Matrixx) S5-140-e

AI: 7.1

noted [WTS] [JSN]
S5-216010 SA5 working procedures other WG Chair S5-140-e

AI: 5.1

noted [WTS] [JSN]
S5-216011 Process for management of draft TS-TRs other WG Chair S5-140-e

AI: 5.1

noted [WTS] [JSN]
S5-216012 SA5 meeting calendar other WG CHair S5-140-e

AI: 5.4

noted [WTS] [JSN]
S5-216013 Resubmitted LS cc SA5 on Prioritized Vehicle to Cloud Technical Solutions LS in

LS reply in S5-216412, S5-216412

Automotive Edge Computing Consortium (AECC) S5-140-e

AI: 5.3

replied to [WTS] [JSN]
S5-216014 Resubmitted LS on Guidelines on Port Allocation for New 3GPP Interfaces LS in C4-214848 S5-140-e

AI: 5.3

postponed [WTS] [JSN]
S5-216015 Resubmitted LS on slicing management aspects in relation to SEAL LS in S6-210709 S5-140-e

AI: 5.3

postponed [WTS] [JSN]
S5-216016 Resubmitted LS on the mapping between service types and slice at application LS in

LS reply in S5-216414, S5-216414

R3-212904 S5-140-e

AI: 6.1

replied to [WTS] [JSN]
S5-216017 Resubmitted Reply LS on Inclusive language for ANR LS in

LS reply in S5-216197, S5-216197

R2-2108869 S5-140-e

AI: 5.3

replied to [WTS] [JSN]
S5-216018 Resubmitted Reply LS on Inclusive Language for ANR LS in R3-214289 S5-140-e

AI: 5.3

noted [WTS] [JSN]
S5-216019 Resubmitted Reply LS on QoE configuration and reporting related issues LS in

LS reply in S5-216415, S5-216415

R3-214471 S5-140-e

AI: 6.1

replied to [WTS] [JSN]
S5-216020 Resubmitted LS on RAN3 agreements for NR QoE LS in R3-214477 S5-140-e

AI: 6.1

postponed [WTS] [JSN]
S5-216021 Resubmitted LS on the Beam measurement reports for the MDT measurements LS in

LS reply in S5-216628, S5-216137, S5-216628

R3-214519 S5-140-e

AI: 6.1

replied to [WTS] [JSN]
S5-216022 Resubmitted LS on Network slice information from OAM LS in

LS reply in S5-216416, S5-216416

S2-2106634 S5-140-e

AI: 6.1

replied to [WTS] [JSN]
S5-216023 Resubmitted LS on TS 28.404/TS 28.405 Clarification LS in S4-211234 S5-140-e

AI: 6.1

postponed [WTS] [JSN]
S5-216024 Resubmitted LS Reply on QoE report handling at QoE pause LS in

LS reply in S5-216417, S5-216417

S4-211290 S5-140-e

AI: 6.1

replied to [WTS] [JSN]
S5-216025 Resubmitted Reply LS on Inclusive language review LS in SP-211140 S5-140-e

AI: 5.3

noted [WTS] [JSN]
S5-216026 LS ccSA5 on updating the readme.md file in 3GPP Forge LS in

LS reply in S5-216413, S5-216413

C4-215475 S5-140-e

AI: 5.3

replied to [WTS] [JSN]
S5-216027 LSccSA5 on updating the readme.md file in 3GPP Forge LS in C3-215408 S5-140-e

AI: 5.3

noted [WTS] [JSN]
S5-216028 LS reply on UPF reporting for redundant transmission on transport layer LS in S2-2107862 S5-140-e

AI: 7.1

noted [WTS] [JSN]
S5-216029 Reply LS on UPF reporting for redundant transmission on transport layer LS in C4-215505 S5-140-e

AI: 7.1

noted [WTS] [JSN]
S5-216030 Reply LS on PSCELL ID availability in SGW CDR LS in ETSI TC LI S5-140-e

AI: 7.1

noted [WTS] [JSN]
S5-216031 LIAISON STATEMENT TO 3GPP TSG SA AND SA6 (forwarded to SA5) - APT REPORT ON EMERGING CRITICAL APPLICATIONS & USE CASES OF IMT FOR INDUSTRIAL, SOCIETAL AND ENTERPRISE USERS LS in APT Wireless Group S5-140-e

AI: 5.3

postponed [WTS] [JSN]
S5-216032 LSout to 3GPP SA5 about MANO performance measurements accuracy to estimate VNF energy consumption LS in

LS reply in S5-216419, S5-216419

ETSI ISG NFV S5-140-e

AI: 6.1

replied to [WTS] [JSN]
S5-216033 LS on introducing NR RedCap Indication LS in S2-2107853 S5-140-e

AI: 5.3

postponed [WTS] [JSN]
S5-216034 LS Reply ccSA5 on the offline charging only indication LS in S2-2107863 S5-140-e

AI: 7.1

noted [WTS] [JSN]
S5-216035 LS on MINT functionality for Disaster Roaming LS in S2-2108172 S5-140-e

AI: 5.3

postponed [WTS] [JSN]
S5-216036 LS on network slice management service consumption LS in S6-212460 S5-140-e

AI: 6.1

postponed [WTS] [JSN]
S5-216037 Add new common types for YANG CR Ericsson Hungary Ltd 28.623 16.9.0 CR#141 catB adNRM Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216038 pCR 28.538 Import attribute tAI to for Edge NRM pCR Nanjing Ericsson Panda Com Ltd, Samsung 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

approved [WTS] [JSN]
S5-216039 Correction of YANG Solution set CR Ericsson Hungary Ltd 28.541 17.4.0 CR#607 catF adNRM Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216040 Rel-17 CR 28.313 Add LBO use cases, requirements, and procedure CR

revised to S5-216462

Intel Corporation (UK) Ltd 28.313 17.2.0 CR#37 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.13

revised [WTS] [JSN]
S5-216041 Discussion paper for async solutions to support lifecycle management discussion Intel Corporation (UK) Ltd ECM Rel-17 S5-140-e

AI: 6.4.21

withdrawn [WTS] [JSN]
S5-216042 Description of Information Elements of an Intent pCR

revision of S5-215285

revised to S5-216447

Nokia Germany 28.312 0.5.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

revised [WTS] [JSN]
S5-216043 Extend Attributes of the Intent IOC pCR

revision of S5-215286

revised to S5-216448

Nokia Germany 28.312 0.5.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

revised [WTS] [JSN]
S5-216044 Presentation of TR 28.813 for approval TS or TR cover Orange FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

approved [WTS] [JSN]
S5-216045 pCR TR 28.813 Align conclusion titles pCR Orange 28.813 1.2.0 FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

approved [WTS] [JSN]
S5-216046 pCR TR 28.813 Change editor’s note to note in KI#3 pCR

revised to S5-216565

Orange 28.813 1.2.0 FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

revised [WTS] [JSN]
S5-216047 pCR TR 28.813 Add conclusion to Key Issue #3 pCR Orange, China Telecom 28.813 1.2.0 FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

approved [WTS] [JSN]
S5-216048 New SID on new aspects of EE for 5G networks Phase 2 SID new

revised to S5-216424

Orange Rel-18 S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216049 New WID on enhancements of EE for 5G phase 2 WID new

revised to S5-216425

Orange Rel-18 S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216050 Rel-17 CR NRM for CHO CR

revised to S5-216465

Ericsson France S.A.S 28.541 17.4.0 CR#608 catB E_HOO Rel-17 S5-140-e

AI: 6.4.14

revised [WTS] [JSN]
S5-216051 Rel-17 CR NRM for CHO Stage 3 CR

revised to S5-216466

Ericsson France S.A.S 28.541 17.4.0 CR#609 catB E_HOO Rel-17 S5-140-e

AI: 6.4.14

revised [WTS] [JSN]
S5-216052 Rel-17 CR NRM for DAPS handover CR

revised to S5-216467

Ericsson France S.A.S 28.541 17.4.0 CR#610 catB E_HOO Rel-17 S5-140-e

AI: 6.4.14

revised [WTS] [JSN]
S5-216053 Rel-17 CR NRM for DAPS handover Stage 3 CR

revised to S5-216468

Ericsson France S.A.S 28.541 17.4.0 CR#611 catB E_HOO Rel-17 S5-140-e

AI: 6.4.14

revised [WTS] [JSN]
S5-216054 Rel-16 CR 28.310 Update energy saving solutions CR

revised to S5-216431

Huawei 28.31 16.5.0 CR#19 catF EE_5G Rel-16 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216055 Rel-17 CR 28.310 Update energy saving solutions CR

revised to S5-216432

Huawei 28.31 17.2.0 CR#20 catA EE_5G Rel-17 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216056 pCR 28.557 Update names for management modes of NPN pCR

revised to S5-216445

Huawei 28.557 1.1.0 OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

revised [WTS] [JSN]
S5-216057 pCR 28.557 Solution for management of SNPN pCR Huawei 28.557 1.1.0 OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

noted [WTS] [JSN]
S5-216058 pCR 28.557 Solution for exposure of management capability of PNI-NPN pCR Huawei 28.557 1.1.0 OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

noted [WTS] [JSN]
S5-216059 pCR 28.557 Solution for collecting UE related data pCR Huawei 28.557 1.1.0 OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

noted [WTS] [JSN]
S5-216060 pCR 28.557 Update NPN management aspects pCR

revised to S5-216550

Huawei 28.557 1.1.0 OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

revised [WTS] [JSN]
S5-216061 pCR 28.557 Remove editor notes pCR Huawei 28.557 1.1.0 OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

approved [WTS] [JSN]
S5-216062 pCR 28.557 Rapporteur proposal pCR Huawei 28.557 1.1.0 OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

approved [WTS] [JSN]
S5-216063 Rel-17 CR 28.541 Remove editor notes CR Huawei 28.541 17.4.0 CR#612 catF EMA5SLA Rel-17 S5-140-e

AI: 6.4.2

agreed [WTS] [JSN]
S5-216064 pCR 28.813 Update solution of Key Issue 6 pCR

revised to S5-216566

Huawei 28.813 1.2.0 FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

revised [WTS] [JSN]
S5-216065 pCR 28.813 Update impact on normative work of Key Issue 4 pCR

revised to S5-216612

Huawei 28.813 1.2.0 FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

revised [WTS] [JSN]
S5-216066 Update 5GC NRM for 5G_DDNMF reference point CR CATT 28.541 17.4.0 CR#613 catF adNRM Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216067 Revised SID New aspects of EE for 5G networks SID revised Orange FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

agreed [WTS] [JSN]
S5-216068 Revised WID Enhancements on EE for 5G networks WID revised Orange EE5GPLUS Rel-17 S5-140-e

AI: 6.4.15

agreed [WTS] [JSN]
S5-216069 Rel-17 CR 32.291 Correcting response code references CR Ericsson LM 32.291 17.0.0 CR#355 catF TEI17 Rel-17 S5-140-e

AI: 7.3

not pursued [WTS] [JSN]
S5-216070 Rel-17 CR 32.255 Correcting unit count inactivity timer trigger CR Ericsson LM 32.255 17.3.0 CR#346 catF TEI17 Rel-17 S5-140-e

AI: 7.3

not pursued [WTS] [JSN]
S5-216071 Rel-17 CR 32.255 Correcting SSC mode and triggers CR Ericsson LM 32.255 17.3.0 CR#347 catF TEI17 Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216072 Rel-17 CR 32.255 Correcting home provided charging id at inter-PLMN V-SMF change CR

revised to S5-216534

Ericsson LM 32.255 17.3.0 CR#348 catF TEI17 Rel-17 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216073 Rel-17 CR 32.281 Addition of IMS converged charging announcement CR

revised to S5-216499

Ericsson LM 32.281 17.0.0 CR#11 catB 5GSIMSCH Rel-17 S5-140-e

AI: 7.4.1

revised [WTS] [JSN]
S5-216074 Rel-17 CR 32.291 Addition of IMS converged charging announcement CR

revised to S5-216502

Ericsson LM 32.291 17.0.0 CR#356 catB 5GSIMSCH Rel-17 S5-140-e

AI: 7.4.1

revised [WTS] [JSN]
S5-216075 Rel-17 CR 32.275 Correction of references for converged charging CR

revised to S5-216500

Ericsson LM 32.275 17.2.0 CR#83 catF 5GSIMSCH Rel-17 S5-140-e

AI: 7.4.1

revised [WTS] [JSN]
S5-216076 Rel-17 CR 32.291 Addition of MMTel converged charging information CR

revised to S5-216501

Ericsson LM 32.291 17.0.0 CR#357 catB 5GSIMSCH Rel-17 S5-140-e

AI: 7.4.1

revised [WTS] [JSN]
S5-216077 Rel-17 pCR 32.847 New key issue on types of maximum pCR

revised to S5-216522

Ericsson LM 32.847 0.5.0 FS_NETSLICE_CH Rel-17 S5-140-e

AI: 7.5.5

revised [WTS] [JSN]
S5-216078 Rel-17 pCR 28.826 Use case trigger without usage pCR

revised to S5-216523

Ericsson LM 28.826 0.1.0 FS_NCHF_Ph2 Rel-17 S5-140-e

AI: 7.5.6

revised [WTS] [JSN]
S5-216079 Rel-17 pCR 28.826 Solution for 3a based on service identifier pCR Ericsson LM 28.826 0.1.0 FS_NCHF_Ph2 Rel-17 S5-140-e

AI: 7.5.6

noted [WTS] [JSN]
S5-216080 Rel-17 pCR 28.826 Solution for 3a based on rating group map pCR Ericsson LM 28.826 0.1.0 FS_NCHF_Ph2 Rel-17 S5-140-e

AI: 7.5.6

noted [WTS] [JSN]
S5-216081 Rel-17 pCR 28.826 Use case size of charging information pCR

revised to S5-216525

Ericsson LM 28.826 0.1.0 FS_NCHF_Ph2 Rel-17 S5-140-e

AI: 7.5.6

revised [WTS] [JSN]
S5-216082 Rel-17 pCR 28.827 Adding reference point architecture to clause 7.1.4 pCR

revised to S5-216526

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

revised [WTS] [JSN]
S5-216083 Rel-17 pCR 28.827 Adding SBI architecture to clause 7.2.4 pCR

revised to S5-216527

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

revised [WTS] [JSN]
S5-216084 Rel-17 pCR 28.827 Adding reference point architecture to clause 7.3.4 pCR

revised to S5-216528

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

revised [WTS] [JSN]
S5-216085 Rel-17 pCR 28.827 Adding reference point architecture to clause 7.4.4 pCR

revised to S5-216529

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

revised [WTS] [JSN]
S5-216086 Rel-17 pCR 28.827 New use case MVNO without CHF pCR

revised to S5-216530

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

revised [WTS] [JSN]
S5-216087 Rel-17 pCR 28.827 New potential solution MVNO without CHF pCR

revised to S5-216531

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

revised [WTS] [JSN]
S5-216088 Rel-17 pCR 28.827 Adding reference point architecture to clause 7.5.4 pCR

revised to S5-216532

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

revised [WTS] [JSN]
S5-216089 Adding Signalling Based Activation for UTRAN and LTE CR

revised to S5-216544

Ericsson LM 28.405 16.1.0 CR#3 catB eQoE Rel-17 S5-140-e

AI: 6.4.5

revised [WTS] [JSN]
S5-216090 Rel-17 Input to Draft CR 28.623 Update YANG for MNS Registry other

revision of S5-215263

Ericsson LM,Huawei 5GDMS S5-140-e

AI: 6.4.16

approved [WTS] [JSN]
S5-216091 New Rel-18 WID on Enhanced intent driven management services for mobile network SID new

revision of S5-215086

revised to S5-216577

Huawei, China Telecom, CATT, AsiaInfo, China Unicom, China Mobile Rel-18 S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216092 Update Inventory stage2 to support SBMA CR

revised to S5-221233

Ericsson Hungary Ltd 28.632 16.0.0 CR#5 catB NSA_SBMA Rel-17 S5-140-e

AI: 6.4.22

not pursued [WTS] [JSN]
S5-216093 Rel-17 CR 28.541 Stage 3 YANG updates for stage 2 CRs 214164, 585-8 CR

revised to S5-216620

Cisco Systems Belgium 28.541 17.4.0 CR#614 catC adNRM Rel-17 S5-140-e

AI: 6.4.4

revised [WTS] [JSN]
S5-216094 Adding Management Based Activation and Temporary stop and restart during RAN overload in NR draftCR

revised to S5-216545

Ericsson LM eQoE Rel-16 S5-140-e

AI: 6.4.5

revised [WTS] [JSN]
S5-216095 Rel-17 CR 28.532 Add definition of additionalText in notifyMOIAttributeValueChanges CR Intel Corporation (UK) Ltd 28.532 16.9.0 CR#192 catC eSON_5G Rel-17 S5-140-e

AI: 6.4.13

not pursued [WTS] [JSN]
S5-216096 pCR 28.314 PnC Concepts and Requirements - minor updates pCR Oy LM Ericsson AB 28.314 0.3.0 PACMAN Rel-17 S5-140-e

AI: 6.4.19

approved [WTS] [JSN]
S5-216097 pCR 28.315 PnC Procedure flows - minor updates pCR

revised to S5-216558

Oy LM Ericsson AB 28.315 0.2.0 PACMAN Rel-17 S5-140-e

AI: 6.4.19

revised [WTS] [JSN]
S5-216098 Rel-17 draftCR 28.537 Add requirements for data management draftCR

revision of S5-215273

revised to S5-221410

Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216099 Rel-17 Input to DraftCR 28.622 Add data collection job to allow consumers without detailed knowledge of the network to request for data draftCR

revision of S5-215251

Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216100 Rel-17 CR 32.421 Introduce missing interfaces of HSS CR Nokia, Nokia Shanghai Bell 32.421 17.2.0 CR#102 catA 5GMDT Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216101 Rel-17 CR 32.422 Introduce missing interfaces of HSS CR Nokia, Nokia Shanghai Bell 32.422 17.4.0 CR#377 catA 5GMDT Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216102 Rel-16 CR 32.421 Introduce missing interfaces of HSS CR Nokia, Nokia Shanghai Bell 32.421 16.1.0 CR#103 catF 5GMDT Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216103 Rel-16 CR 32.422 Introduce missing interfaces of HSS CR Nokia, Nokia Shanghai Bell 32.422 16.7.0 CR#378 catF 5GMDT Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216104 Rel-16 CR 32.423 Introduce missing IEs for HSS and UDM Trace Record CR

revised to S5-216443

Nokia, Nokia Shanghai Bell 32.423 16.4.0 CR#127 catF 5GMDT Rel-16 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216105 Rel-17 CR 32.423 Introduce missing IEs for HSS and UDM Trace Record CR

revised to S5-216444

Nokia, Nokia Shanghai Bell 32.423 17.2.0 CR#128 catA 5GMDT Rel-17 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216106 Rel-16 CR 28.623 Introduce missing IEs for HSS and UDM Trace Record CR Nokia, Nokia Shanghai Bell 28.623 16.9.0 CR#142 catF 5GMDT Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216107 Rel-17 CR 28.313 Add information in the PCI configuration notification CR Intel Corporation (UK) Ltd 28.313 17.2.0 CR#38 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.13

not pursued [WTS] [JSN]
S5-216108 Rel-17 CR 28.313 Add information in the C-SON notification CR Intel Corporation (UK) Ltd 28.313 17.2.0 CR#39 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.13

not pursued [WTS] [JSN]
S5-216109 Rel-17 CR 28.552 Add EAS data volume measurements CR

revised to S5-216560

Intel Corporation (UK) Ltd 28.552 17.4.0 CR#332 catB ECM Rel-17 S5-140-e

AI: 6.4.21

revised [WTS] [JSN]
S5-216110 pCR 28.538 add MnS information for EAS performance assurance pCR

revised to S5-216561

Intel Corporation (UK) Ltd 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

revised [WTS] [JSN]
S5-216111 enhance SBMA to support access control CR Nokia, Nokia Shanghai Bell, Ericsson 28.533 17.0.0 CR#91 catB MSAC Rel-17 S5-140-e

AI: 6.4.23

withdrawn [WTS] [JSN]
S5-216112 enhance SBMA to support access control CR Nokia, Nokia Shanghai Bell, Ericsson 28.533 17.0.0 CR#92 catB MSAC Rel-17 S5-140-e

AI: 6.4.23

agreed [WTS] [JSN]
S5-216113 enhance request-response communication paradigm to support access control CR Nokia, Nokia Shanghai Bell, Ericsson 28.533 17.0.0 CR#93 catB MSAC Rel-17 S5-140-e

AI: 6.4.23

agreed [WTS] [JSN]
S5-216114 CR 28.531 Fixing NetworkSlice and NetworkSliceSubnet Allocation and Deallocation Stage 3 CR Samsung Electronics France SA 28.531 17.1.0 CR#96 catF DUMMY Rel-17 S5-140-e

AI: 6.4.24

not pursued [WTS] [JSN]
S5-216115 Rel-17 InputToDraftCR 28.537 Targeted management data collection other Samsung Electronics France SA MADCOL Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216116 pCR 28.825 Add analysis and comparison of potential solutions pCR

revised to S5-216627

ZTE, China Unicom 28.825 0.2.0 FS_MANS Rel-17 S5-140-e

AI: 6.5.7

revised [WTS] [JSN]
S5-216117 Rel-17 InputToDraftCR 28.622 ManagementDataSubscription other Samsung, Ericsson MADCOL Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216118 pCR 28.825 Add recommendation and conclusion pCR ZTE, China Unicom 28.825 0.2.0 FS_MANS Rel-17 S5-140-e

AI: 6.5.7

noted [WTS] [JSN]
S5-216119 pCR 28.556 Add notificaition definition pCR

revised to S5-216455

China Mobile Com. Corporation 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

revised [WTS] [JSN]
S5-216120 pCR 28.556 Change stage 2 information attribute definition pCR

revised to S5-216456

China Mobile Com. Corporation 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

revised [WTS] [JSN]
S5-216121 pCR 28.556 Add stage 3 definition pCR

revised to S5-216458

China Mobile Com. Corporation 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

revised [WTS] [JSN]
S5-216122 Rel-16 CR TS 28.405 Correct the description of QoE reference and PLMN target CR ZTE Corporation 28.405 16.1.0 CR#4 catF TEI16 Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216123 pCR 28.538 EESFunction definition and procedure pCR Samsung Electronics France SA 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

noted [WTS] [JSN]
S5-216124 Presentation of Spec 28.556 to SA for Approval TS or TR cover China Mobile Com. Corporation NPM Rel-17 S5-140-e

AI: 6.4.11

approved [WTS] [JSN]
S5-216125 pCR 28.104 Replace alarm incident with alarm information pCR

revised to S5-216471

ZTE Corporation 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216126 pCR 28.312 ServiceDeploymentExpectation Datatype definition pCR Samsung Electronics France SA 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

noted [WTS] [JSN]
S5-216127 pCR 28.104 Software Management usecase and requirements pCR

revised to S5-216472

Samsung Electronics France SA 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216128 pCR 28.104 Paging Optimization usecase and requirements pCR

revised to S5-216473

Samsung Electronics France SA 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216129 pCR 28.104 HO Optimization usecase and requirements pCR

revised to S5-216474

Samsung Electronics France SA 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216130 Rel-17 pCR 28.813 EE of URLLC slice based on reliability pCR Samsung Electronics France SA 28.813 1.2.0 FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

noted [WTS] [JSN]
S5-216131 New SID on Charging Aspects for Non-Public Networks SID new

revised to S5-216503

China Mobile Com. Corporation Rel-18 S5-140-e

AI: 7.2

revised [WTS] [JSN]
S5-216132 New SID Study on Computing Power Management and Orchestration SID new China Telecommunications Rel-18 S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216133 Rel-17 CR 28.552 Add enhanced MIMO PRB Usage for cell CR

revised to S5-216546

China Unicom 28.552 17.4.0 CR#333 catB ePM_KPI_5G Rel-17 S5-140-e

AI: 6.4.6

revised [WTS] [JSN]
S5-216134 Discussion on enhanced MIMO PRB Usage for cell discussion

revised to S5-216547

China Unicom ePM_KPI_5G Rel-17 S5-140-e

AI: 6.4.6

revised [WTS] [JSN]
S5-216135 Add new requirements for configuration of beam level measurement CR Ericsson Japan K-K 32.421 17.2.0 CR#104 catB e_5GMDT Rel-17 S5-140-e

AI: 6.4.3

agreed [WTS] [JSN]
S5-216136 Add beam level configuration parameter in NR CR

revised to S5-216537

Ericsson Japan K-K 32.422 17.4.0 CR#379 catB e_5GMDT Rel-17 S5-140-e

AI: 6.4.3

revised [WTS] [JSN]
S5-216137 Reply to: LS on the Beam measurement reports for the MDT measurements LS out

LS is reply to S5-216021

source LS: S5-215030

LS To: RAN3

revised to S5-216628

Ericsson Rel-17 S5-140-e

AI: 6.1

revised [WTS] [JSN]
S5-216138 New SID on new network resource usage type for charging in the 5G System (5GS) SID new

revised to S5-216533

Huawei Rel-17 S5-140-e

AI: 7.2

revised [WTS] [JSN]
S5-216139 New Work Item on charging enhancement for 5GS CIoT WID new

revised to S5-216518

Huawei Rel-17 S5-140-e

AI: 7.2

revised [WTS] [JSN]
S5-216140 Rel-17 pCR 28.816 Clean up pCR

revised to S5-216504

Huawei 28.816 1.1.0 FS_5G_CIoT_CH Rel-17 S5-140-e

AI: 7.5.2

revised [WTS] [JSN]
S5-216141 Rel-17 pCR 28.822 Correction on CEF based architecuture in solution 1.2 pCR Huawei 28.822 0.5.0 FS_5GLAN_CH Rel-17 S5-140-e

AI: 7.5.4

noted [WTS] [JSN]
S5-216142 Rel-17 pCR 28.822 Correction on the editorial issues pCR Huawei 28.822 0.5.0 FS_5GLAN_CH Rel-17 S5-140-e

AI: 7.5.4

approved [WTS] [JSN]
S5-216143 Rel-17 pCR 28.822 Correction on the Reference pCR

revised to S5-216517

Huawei 28.822 0.5.0 FS_5GLAN_CH Rel-17 S5-140-e

AI: 7.5.4

revised [WTS] [JSN]
S5-216144 Rel-17 pCR 28.822 Remove the editor‘s note for topic 4 pCR Huawei 28.822 0.5.0 FS_5GLAN_CH Rel-17 S5-140-e

AI: 7.5.4

noted [WTS] [JSN]
S5-216145 Rel-17 CR 32.255 Addition of the 5G LAN service charging in Annex CR Huawei 32.255 17.3.0 CR#349 catB 5GLAN_CH Rel-17 S5-140-e

AI: 7.4.5

not pursued [WTS] [JSN]
S5-216146 Rel-17 CR 32.255 Addition of the 5G LAN service charging in charging principle CR

revised to S5-216497

Huawei 32.255 17.3.0 CR#350 catB 5GLAN_CH Rel-17 S5-140-e

AI: 7.4.5

revised [WTS] [JSN]
S5-216147 Rel-17 CR 32.255 Addition of the 5G LAN service charging requirements CR

revised to S5-216493

Huawei 32.255 17.3.0 CR#351 catB 5GLAN_CH Rel-17 S5-140-e

AI: 7.4.5

revised [WTS] [JSN]
S5-216148 Discussion paper on Charging Identifier Uniqueness Mechanism discussion Huawei Rel-17 S5-140-e

AI: 7.3

noted [WTS] [JSN]
S5-216149 Rel-16 CR 32.290 Addition of the Threshold based re-authorization triggers CR

revised to S5-216571

Huawei 32.29 16.9.0 CR#171 catF TEI16 Rel-16 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216150 Rel-17 CR 32.290 Addition of the Threshold based re-authorization triggers CR

revised to S5-216572

Huawei 32.29 17.3.0 CR#172 catA TEI16 Rel-17 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216151 Rel-16 CR 32.290 Clarification on the immediate Report CR Huawei 32.29 16.9.0 CR#173 catF TEI16 Rel-16 S5-140-e

AI: 7.3

not pursued [WTS] [JSN]
S5-216152 Rel-17 CR 32.290 Clarification on the immediate Report CR

revised to S5-216573

Huawei 32.29 17.3.0 CR#174 catA TEI16 Rel-17 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216153 Rel-16 CR 32.290 Clarify the NF consumers CR Huawei 32.29 16.9.0 CR#175 catF TEI16 Rel-16 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216154 Rel-17 CR 32.290 Clarify the NF consumers CR Huawei 32.29 17.3.0 CR#176 catA TEI16 Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216155 Rel-16 CR 32.255 Correction on the User Location Time Description CR

revised to S5-216567

Huawei 32.255 16.10.0 CR#352 catF TEI16 Rel-16 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216156 Rel-17 CR 32.255 Correction on the User Location Time Description CR

revised to S5-216568

Huawei 32.255 17.3.0 CR#353 catA TEI16 Rel-17 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216157 Rel-17 pCR 28.827 Correction on the potential charging architectures pCR

revised to S5-216521

Huawei 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

revised [WTS] [JSN]
S5-216158 Rel-16 CR 32.291 Alignment of the charging data request and response CR

revision of S5-215582

revised to S5-216569

Huawei 32.291 16.9.0 CR#3522 catF TEI16 Rel-16 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216159 Rel-17 CR 32.291 Alignment of the charging data request and response CR

revision of S5-215583

revised to S5-216570

Huawei 32.291 17.0.0 CR#3532 catA TEI16 Rel-17 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216160 Rel-17 CR 32.291 Addition of QoS Monitoring to Assist URLLC Service CR

revision of S5-215467

revised to S5-216574

Huawei 32.291 17.0.0 CR#3542 catF 5G_URLLC Rel-17 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216161 Rel-17 CR 32.298 Addition of QoS Monitoring to Assist URLLC Service CR

revision of S5-215468

revised to S5-216575

Huawei 32.298 17.0.0 CR#8812 catF 5G_URLLC Rel-17 S5-140-e

AI: 7.3

revised [WTS] [JSN]
S5-216162 Rel-17 pCR 28.815 Correction on CEF based architecuture in solution 7.4.4.9 pCR

revised to S5-216512

Huawei 28.815 1.3.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

revised [WTS] [JSN]
S5-216163 Rel-17 pCR 28.815 Evaluation and Conclusion for Solution 7.1.4.3 pCR Huawei 28.815 1.3.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

merged [WTS] [JSN]
S5-216164 Rel-17 CR TS 28.659 Provide YAML solution set for EUTRAN NRM CR

revision of S5-215132

revised to S5-221162

Huawei 28.659 16.2.0 CR#391 catB NSA_SBMA Rel-17 S5-140-e

AI: 6.4.22

not pursued [WTS] [JSN]
S5-216165 Rel-17 CR TS 28.663 Provide YAML solution set for RAN NRM CR

revision of S5-215133

revised to S5-221163

Huawei 28.663 16.0.0 CR#211 catB NSA_SBMA Rel-17 S5-140-e

AI: 6.4.22

not pursued [WTS] [JSN]
S5-216166 Rel-17 CR TS 28.541 Add tenant IOC to support multiple tenant environment CR Huawei 28.541 17.4.0 CR#615 catB eMEMTANE Rel-17 S5-140-e

AI: 6.4.7

withdrawn [WTS] [JSN]
S5-216167 New SID Intent driven management for 5GC SID new Huawei S5-140-e

AI: 6.2

merged [WTS] [JSN]
S5-216168 Rel-17 CR 28.541 Add N70 N71 stage 3 CR Huawei 28.541 17.4.0 CR#616 catB adNRM Rel-17 S5-140-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-216169 Rel-17 CR 28.531 Update NSI and NSSI allocation precedures CR Huawei 28.531 17.1.0 CR#97 catB eMEMTANE Rel-17 S5-140-e

AI: 6.4.7

not pursued [WTS] [JSN]
S5-216170 Rel-17 CR 28.541 Update ServiceProfile and SliceProfile CR Huawei 28.541 17.4.0 CR#617 catB eMEMTANE Rel-17 S5-140-e

AI: 6.4.7

not pursued [WTS] [JSN]
S5-216171 pCR 28.811 Editorial cleanup pCR Huawei 28.811 0.7.0 FS_NSMEN Rel-17 S5-140-e

AI: 6.5.2

approved [WTS] [JSN]
S5-216172 Presentation sheet for approval of TR 28.811 other

revised to S5-216615

Huawei FS_NSMEN Rel-17 S5-140-e

AI: 6.5.2

revised [WTS] [JSN]
S5-216173 pCR 28.556 update Policy activation and deactivation procedure pCR

revised to S5-216457

Huawei 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

revised [WTS] [JSN]
S5-216174 pCR 28.556 update PolicyContent definition pCR

revised to S5-216459

Huawei 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

revised [WTS] [JSN]
S5-216175 pCR 28.104 Alignment of terminology pCR

revised to S5-216475

Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216176 pCR 28.538 add ECS termination procedure pCR Huawei 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

approved [WTS] [JSN]
S5-216177 pCR 28.538 add Provisioning MnS for Edge Computing pCR

revised to S5-216562

Huawei 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

revised [WTS] [JSN]
S5-216178 pCR 28.538 add transport view for EAS pCR

revised to S5-216563

Huawei 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

revised [WTS] [JSN]
S5-216179 pCR 28.538 updating EAS termination procedure pCR Huawei 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

approved [WTS] [JSN]
S5-216180 pCR 28.819 Describe ETSI NFV testing framework pCR

revised to S5-216626

Huawei 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

revised [WTS] [JSN]
S5-216181 pCR 28.824 Concept definition for Exposed Management Service pCR

revised to S5-216582

Huawei 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216182 New SID on alignment with GSMA OPG and ETSI MEC for Edge computing management SID new Huawei, Samsung S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216183 Rel-17 CR 28.622 Add support for MnS Discovery CR

revision of S5-215532

Huawei 28.622 16.9.0 CR#1221 catB 5GDMS Rel-17 S5-140-e

AI: 6.4.16

not pursued [WTS] [JSN]
S5-216184 Rel-17 CR 28.623 Add support for MnS Discovery CR

revision of S5-215533

Huawei 28.623 16.9.0 CR#1401 catB 5GDMS Rel-17 S5-140-e

AI: 6.4.16

not pursued [WTS] [JSN]
S5-216185 Rel-17 PCR TS 28.104 add coverage analysis requirement pCR

revised to S5-216476

Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216186 Rel-17 PCR TS 28.104 Add alarm incident analysis use case and requirement pCR Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

withdrawn [WTS] [JSN]
S5-216187 Rel-17 PCR TS 28.104 Add alarm incident analysis solution pCR Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216188 Rel-17 pCR 28.104 Add KPI anomaly analysis use case and requirement pCR Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216189 Rel-17 pCR 28.104 Add KPI anomaly analysis solution pCR Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216190 Rel-17 PCR TS 28.104 add MDA assisted Energy Saving use case and requirement pCR

revised to S5-216477

Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216191 Rel-17 PCR TS 28.104 add MDA assisted Energy Saving solution pCR Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216192 Rel-17 PCR TS 28.104 add mobility management solution pCR Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216193 Rel-17 PCR TS 28.104 add MDA analysis request and report Workflow pCR Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216194 Rel-17 pCR TS 28.104 Add MDA analysis report reporting related service component pCR

revised to S5-216622

Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216195 Rel-17 CR 28.313 Add C-SON CCO control information CR

revised to S5-216463

Huawei 28.313 17.2.0 CR#40 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.13

revised [WTS] [JSN]
S5-216196 Rel-17 CR 28.541 Add C-SON CCO NRM model CR Huawei 28.541 17.4.0 CR#618 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.13

not pursued [WTS] [JSN]
S5-216197 Reply to: Reply LS on Inclusive language for ANR LS out

LS is reply to S5-216017

LS To: RAN2

Huawei S5-140-e

AI: 5.3

approved [WTS] [JSN]
S5-216198 Rel-17 CR TS 28.541 Update inclusive language modification for TS 28.541 CR

revised to S5-216437

Huawei 28.541 17.4.0 CR#619 catD TEI17 Rel-17 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216199 pCR 28.825 add reference and abbrevation pCR China Unicom 28.825 0.2.0 FS_MANS Rel-17 S5-140-e

AI: 6.5.7

approved [WTS] [JSN]
S5-216200 pCR 28.825 add concepts and overview pCR China Unicom 28.825 0.2.0 FS_MANS Rel-17 S5-140-e

AI: 6.5.7

approved [WTS] [JSN]
S5-216201 pCR 28.825 rapporteur's proposal pCR China Unicom 28.825 0.2.0 FS_MANS Rel-17 S5-140-e

AI: 6.5.7

approved [WTS] [JSN]
S5-216202 pCR 28.825 add conclusions and recommendations pCR China Unicom 28.825 0.2.0 FS_MANS Rel-17 S5-140-e

AI: 6.5.7

approved [WTS] [JSN]
S5-216203 pCR 28.825 cleanup pCR China Unicom 28.825 0.2.0 FS_MANS Rel-17 S5-140-e

AI: 6.5.7

approved [WTS] [JSN]
S5-216204 Presentation sheet for approval of TR 28.825 TS or TR cover China Unicom FS_MANS Rel-17 S5-140-e

AI: 6.5.7

approved [WTS] [JSN]
S5-216205 Rel-17 CR TS 28.541 Add feasibility check NRM fragment CR

revision of S5-215087

revised to S5-221150

Huawei,China Unicom, Deutsche Telekom,China Mobile 28.541 17.4.0 CR#5362 catB DUMMY Rel-17 S5-140-e

AI: 6.4.24

not pursued [WTS] [JSN]
S5-216206 Rel-17 CR TS 28.531 Update procedure of reservation and checking feasibility of network slice subnet CR

revision of S5-215088

revised to S5-221151

Huawei,China Unicom,Deutsche Telekom,China Mobile 28.531 17.1.0 CR#702 catB DUMMY Rel-17 S5-140-e

AI: 6.4.24

not pursued [WTS] [JSN]
S5-216207 Rel-16 CR TS 28.541 Correct the wrong reference for TS 32.160 CR Huawei 28.541 16.10.0 CR#620 catF eNRM Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216208 Rel-17 CR TS 28.541 Correct the wrong reference for TS 32.160 CR Huawei 28.541 17.4.0 CR#621 catA eNRM Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216209 Rel-15 CR TS 28.622 Update the scope to be applicable for SBMA CR Huawei 28.622 15.5.0 CR#123 catF NETSLICE-5GNRM Rel-15 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216210 Rel-16 CR TS 28.622 Update the scope to be applicable for SBMA CR Huawei 28.622 16.9.0 CR#124 catA NETSLICE-5GNRM Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216211 Rel-15 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA CR

revised to S5-216580

Huawei 28.658 15.6.0 CR#58 catF NETSLICE-5GNRM Rel-15 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216212 Rel-16 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA CR

revised to S5-216581

Huawei 28.658 16.4.0 CR#59 catA NETSLICE-5GNRM Rel-16 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216213 Rel-15 CR TS 28.658 Update Generic RAN NRM to be applicable for SBMA CR

revised to S5-216618

Huawei 28.662 15.3.0 CR#12 catF NETSLICE-5GNRM Rel-15 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216214 Rel-16 CR TS 28.658 Update Generic RAN NRM to be applicable for SBMA CR

revised to S5-216619

Huawei 28.662 16.0.0 CR#13 catA NETSLICE-5GNRM Rel-16 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216215 Rel-16 CR TS 28.533 Fix editorial issues CR Huawei 28.533 16.7.0 CR#94 catF TEI16 Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216216 Rel-17 CR TS 28.533 Fix editorial issue CR Huawei 28.533 17.0.0 CR#95 catA TEI16 Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216217 pCR TS 28.100 update Annex A to align with clause 7.1 pCR Huawei,China Mobile 28.1 0.7.0 ANL Rel-17 S5-140-e

AI: 6.4.9

approved [WTS] [JSN]
S5-216218 pCR TS 28.312 Update the concept of intent in clause 4.1.3 pCR

revised to S5-216449

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

revised [WTS] [JSN]
S5-216219 pCR TS 28.312 Update the use case description to align with intent definition pCR

revised to S5-216450

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

revised [WTS] [JSN]
S5-216220 pCR TS 28.312 Add concept of intent translation pCR

revised to S5-216451

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

revised [WTS] [JSN]
S5-216221 pCR TS 28.312 Update intent life cycle management in Annex B.1 pCR

revised to S5-216452

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

revised [WTS] [JSN]
S5-216222 pCR TS 28.312 pCR TS 28.312 Add generic Intent management requirements pCR

revised to S5-216453

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

revised [WTS] [JSN]
S5-216223 pCR TS 28.312 Update intent information model pCR Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

merged [WTS] [JSN]
S5-216224 pCR TS 28.312 Update RadioNetworkExpectation pCR

revised to S5-216454

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

revised [WTS] [JSN]
S5-216225 Rel-17 CR TS 32.130 Update RAN sharing scenarios to cover 5G RAN sharing CR Huawei,China Unicom 32.13 17.2.0 CR#15 catB MANS Rel-17 S5-140-e

AI: 6.4.17

agreed [WTS] [JSN]
S5-216226 Rel-17 CR TS 32.130 Update requirments for NG-RAN MOCN network sharing scenarios CR Huawei,China Unicom 32.13 17.2.0 CR#16 catB MANS Rel-17 S5-140-e

AI: 6.4.17

agreed [WTS] [JSN]
S5-216227 Rel-17 CR TS 28.541 Add YAML solution set for NG-RAN MOCN network sharing scenarios(S5-215534) CR Huawei 28.541 17.4.0 CR#622 catB MANS Rel-17 S5-140-e

AI: 6.4.17

agreed [WTS] [JSN]
S5-216228 Rel-17 CR TS 28.541 Add tenant IOC to support multiple tenant environment CR

revision of S5-215089

revised to S5-221161

Huawei 28.541 17.4.0 CR#5382 catB eMEMTANE Rel-17 S5-140-e

AI: 6.4.7

not pursued [WTS] [JSN]
S5-216229 New SID on deterministic communication service assurance SID new

revised to S5-216426

Huawei, China Mobile, CATT, China Unicom Rel-18 S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216230 Rel-17 Input to draftCR S5-215550 TS 28.536 Updates to assurance report for eCOSLA draftCR

revised to S5-216460

Huawei Technologies Japan K.K. eCOSLA Rel-17 S5-140-e

AI: 6.4.12

revised [WTS] [JSN]
S5-216231 Rel-17 Input to draftCR S5-215550 TS 28.536 Add stage 3 SS definitions to assurance report for eCOSLA draftCR

revised to S5-216461

Huawei Technologies Japan K.K. eCOSLA Rel-17 S5-140-e

AI: 6.4.12

revised [WTS] [JSN]
S5-216232 Collection of useful endorsed document and external communication documents other

revision of S5-215154

SA5 Vice chair (Huawei) Rel-17 S5-140-e

AI: 6.1

noted [WTS] [JSN]
S5-216233 TR 28.925 Add key issue on modelling of MnF pCR

revision of S5-215104

revised to S5-216594

Huawei Technologies (Korea) 28.925 0.2.0 FS_eSBMA Rel-17 S5-140-e

AI: 6.5.6

revised [WTS] [JSN]
S5-216234 pCR TR 28.925 Add conclusion and recommendation for Issue#6 pCR Huawei Technologies (Korea) 28.925 0.3.0 FS_eSBMA Rel-17 S5-140-e

AI: 6.5.6

noted [WTS] [JSN]
S5-216235 pCR TR 28.925 Add potential solution and conclusion for Issue#5 pCR Huawei Technologies (Korea) 28.925 0.3.0 FS_eSBMA Rel-17 S5-140-e

AI: 6.5.6

approved [WTS] [JSN]
S5-216236 pCR 28.104 Add E2E latency analysis use case and requirements pCR

revised to S5-216480

Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216237 pCR 28.104 Add E2E latency analysis solution pCR Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216238 pCR 28.104 Add service experience analysis solution pCR Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216239 pCR 28.104 Add network slice throughput analysis solution pCR Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216240 Rel-17 CR TS 32.103 Update 5G specifications information CR Huawei Technologies (Korea) 32.103 16.2.0 CR#32 catF TEI17 Rel-17 S5-140-e

AI: 6.1

noted [WTS] [JSN]
S5-216241 pCR 28.104 Add network slice instance load analysis use case and requirements pCR

revised to S5-216552

Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216242 pCR 28.104 Add network slice instance load analysis solution pCR Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216243 New SID on PaaS for Virtualized Network Functions SID new

revised to S5-216579

China Mobile Com. Corporation Rel-18 S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216244 Rel-16 Fix stage3 definition for plmnId CR Nokia, Nokia Shanghai Bell 28.541 16.10.0 CR#623 catF METHOGY Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216245 Fix stage3 definition for plmnId CR Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#624 catA METHOGY Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216246 Rel-17 network slice isolation CR Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#625 catB EMA5SLA Rel-17 S5-140-e

AI: 6.4.2

not pursued [WTS] [JSN]
S5-216247 network slice protection on N6 interface CR

revised to S5-216438

Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#626 catB EMA5SLA Rel-17 S5-140-e

AI: 6.4.2

revised [WTS] [JSN]
S5-216248 network slice specific authentication CR

revised to S5-216439

Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#627 catB EMA5SLA Rel-17 S5-140-e

AI: 6.4.2

revised [WTS] [JSN]
S5-216249 pCR 28.819 Supplement for notification data pCR China Mobile Com. Corporation, Lenovo, Motorola Mobility 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216250 Forge working procedure change in SA5 Working Procedures other Nokia, Nokia Shanghai Bell S5-140-e

AI: 5.1

approved [WTS] [JSN]
S5-216251 pCR 28.819 Solution of providing vendor feedback pCR

revised to S5-216589

China Mobile Com. Corporation, Lenovo, Motorola Mobility 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

revised [WTS] [JSN]
S5-216252 Discussion Paper on Asynchronous design discussion Nokia, Nokia Shanghai Bell S5-140-e

AI: 6.4.24

noted [WTS] [JSN]
S5-216253 pCR 28.819 Solution of environment data collection pCR

revised to S5-216590

China Mobile Com. Corporation, Lenovo, Motorola Mobility 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

revised [WTS] [JSN]
S5-216254 pCR 28.819 Solution of test orchestration pCR China Mobile Com. Corporation, Lenovo, Motorola Mobility 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

noted [WTS] [JSN]
S5-216255 pCR 28.819 Use case of test data analysis pCR

revised to S5-216592

China Mobile Com. Corporation, Lenovo, Motorola Mobility 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

revised [WTS] [JSN]
S5-216256 pCR TS 28.100 Update scope pCR China Mobile, Huawei 28.1 0.7.0 ANL Rel-17 S5-140-e

AI: 6.4.9

approved [WTS] [JSN]
S5-216257 pCR TS 28.100 Update workflow, tasks and generic autonomous network level description pCR China Mobile, Huawei 28.1 0.7.0 ANL Rel-17 S5-140-e

AI: 6.4.9

approved [WTS] [JSN]
S5-216258 pCR TS 28.100 Clean up pCR China Mobile, Huawei 28.1 0.7.0 ANL Rel-17 S5-140-e

AI: 6.4.9

approved [WTS] [JSN]
S5-216259 Presentation of Spec to TSG TS 28.100 Version 2.0.0 TS or TR cover China Mobile ANL Rel-17 S5-140-e

AI: 6.4.9

approved [WTS] [JSN]
S5-216260 pCR 28.104 add alarm related Incident analysis pCR China Mobile Com. Corporation 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216261 pCR 28.312 update the intent definition pCR China Mobile Com. Corporation 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

noted [WTS] [JSN]
S5-216262 Discussion on digital twin for network management discussion China Mobile Rel-18 S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216263 New SID on Digital twin for network management SID new China Mobile Rel-18 S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216264 New SID on Federated machine learning for mobile network management SID new China Mobile Rel-18 S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216265 pCR 28.104 Add MDA assisted energy saving pCR China Mobile Com. Corporation 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

merged [WTS] [JSN]
S5-216266 pCR 28.312 update the terms and introduction of use cases pCR China Mobile Com. Corporation 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

noted [WTS] [JSN]
S5-216267 Reply LS on network slice management service consumption LS out

LS To: 3GPP SA6

China Mobile S5-140-e

AI: 5.3

noted [WTS] [JSN]
S5-216268 pCR 28.104 add inter-gNB beam selection optimization pCR

revised to S5-216470

China Mobile Com. Corporation 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216269 Modification of network slice related requirements CR

revised to S5-216446

China Mobile 28.531 17.1.0 CR#98 catB EMA5SLA Rel-17 S5-140-e

AI: 6.4.2

revised [WTS] [JSN]
S5-216270 Rel-17 Correction of attribute in ServiceProfile and CNSliceSubnetProfile CR China Mobile 28.541 17.4.0 CR#628 catF EMA5SLA Rel-17 S5-140-e

AI: 6.4.2

not pursued [WTS] [JSN]
S5-216271 Rel-17 Enhance NRM of UDM function CR

revised to S5-216538

China Mobile 28.541 17.4.0 CR#629 catB adNRM Rel-17 S5-140-e

AI: 6.4.4

revised [WTS] [JSN]
S5-216272 TS28.541 CR Rel-17 Stage3 Update for UPF and PCF CR

revised to S5-216539

China Mobile 28.541 17.4.0 CR#630 catF adNRM Rel-17 S5-140-e

AI: 6.4.4

revised [WTS] [JSN]
S5-216273 Add judge requirements and intent database query requirements for intent driven management pCR China Mobile 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

noted [WTS] [JSN]
S5-216274 pCR TS28.104 add MDA related data and usecase requirements pCR

revised to S5-216481

China Mobile 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216275 pCR draft TS28.104 add slice coverage analysis pCR

revised to S5-216553

China Mobile 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216276 CR Rel-17 TS 28.530 Add description for SBMA supporting manangement of 5G SA and NSA scenarios CR

revised to S5-216564

Huawei Technologies (Korea) 28.53 17.1.0 CR#51 catB NSA_SBMA Rel-17 S5-140-e

AI: 6.4.22

revised [WTS] [JSN]
S5-216277 SA5 presentation for Linux Networking Foundation 9 June 2021 other 3GPP SA5 Chair, 3GPP SA5 Vice-Chair(Huawei) S5-140-e

AI: 4.3

noted [WTS] [JSN]
S5-216278 Presentation slides for 3GPP_SA5_Webinar_Part1_SA5_OAM (ETSI3GPP Webinar 28 October 2021) other 3GPP SA5 Chair, 3GPP SA5 Vice-Chair(Huawei) S5-140-e

AI: 4.3

noted [WTS] [JSN]
S5-216279 SA5 presentation for GSMA Mobile World Congress Barcelona 29 June 2021 other 3GPP SA5 Chair, 3GPP SA5 Vice-Chair(Huawei) S5-140-e

AI: 4.3

noted [WTS] [JSN]
S5-216280 SA5 presentation for the TMF Autonomous Networks Industry Summit China 23 Sept. 2021 other 3GPP SA5 Chair, 3GPP SA5 Vice-Chair(Huawei) S5-140-e

AI: 4.3

noted [WTS] [JSN]
S5-216281 SID revised was SP-210136 SID on enhancement of service based management architecture SID revised

revised to S5-216595

Huawei Technologies (Korea) FS_eSBMA Rel-17 S5-140-e

AI: 6.5.6

revised [WTS] [JSN]
S5-216282 Discussion Paper on exposure scenario discussion

revised to S5-216584

Alibaba Group, AsiaInfo Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216283 Add Use Case for the exposure without going through BSS pCR

revised to S5-216616

Alibaba Group, AsiaInfo 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216284 Exposure of network slice as a service pCR

revised to S5-216617

Alibaba Group, AsiaInfo 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216285 Consolidate potential requirements of use cases for eMnS discovery service pCR

revised to S5-216624

Alibaba Group 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216286 Presentation slides for 3GPP_SA5_Webinar_Part2_SA5_CH (ETSI3GPP Webinar 2 November 2021) other 3GPP SA5 Vice Chair/CH Chair (MATRIXX Software), 3GPP SA5 CH Vice Chair(Huawei) S5-140-e

AI: 7.1

noted [WTS] [JSN]
S5-216287 Rel-16 CR 28.622 Add missing definitions of common data types CR

revision of S5-215351

revised to S5-221274

Nokia, Nokia Shanghai Bell 28.622 16.9.0 CR#1072 catF eNRM Rel-16 S5-140-e

AI: 6.3

not pursued [WTS] [JSN]
S5-216288 Rel-17 CR 28.160 Amend stage 2 NRM specification template CR

revision of S5-215356

Nokia, Nokia Shanghai Bell 32.16 17.3.0 CR#251 catD METHOGY, TEI17 Rel-17 S5-140-e

AI: 6.3

not pursued [WTS] [JSN]
S5-216289 Rel-17 DP Solutions for REQ-DMS-3 and REQ-DMS-4 of MnS discovery discussion Nokia, Nokia Shanghai Bell 5GDMS Rel-17 S5-140-e

AI: 6.4.16

noted [WTS] [JSN]
S5-216290 Rel-17 Input to DraftCR 28.622 Amend file retrieval NRM fragment other

revision of S5-215360

revised to S5-216559

Nokia, Nokia Shanghai Bell FIMA Rel-17 S5-140-e

AI: 6.4.

revised [WTS] [JSN]
S5-216291 Rel-17 Input to DraftCR 28.622 Add file download control NRM fragment other

revision of S5-215361

revised to S5-221330

Nokia, Nokia Shanghai Bell FIMA Rel-17 S5-140-e

AI: 6.4.

noted [WTS] [JSN]
S5-216292 Rel-17 Input to DraftCR 28.537 Add requirements for managing external management data other

revision of S5-215362

revised to S5-221363

Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216293 Rel-17 Input to DraftCR 28.537 Add requirements for context data other

revision of S5-215363

revised to S5-221362

Nokia, Nokia Shanghai ell MADCOL Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216294 Rel-17 Input to DraftCR 28.622 Add solution for reporting and storing data other

revision of S5-215365

revised to S5-221364

Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216295 Introduction of 5G DDNMF in charging architecture for 5GS other CATT Rel-17 S5-140-e

AI: 7.4.4

withdrawn [WTS] [JSN]
S5-216296 Introduction of 5G ProSe charging and high-level architecture other CATT Rel-17 S5-140-e

AI: 7.4.4

withdrawn [WTS] [JSN]
S5-216297 Add converged charging architecture for ProSe other CATT Rel-17 S5-140-e

AI: 7.4.4

withdrawn [WTS] [JSN]
S5-216298 Presentation of TR 32.846 for information TS or TR cover CATT FS_5G_Prose_CH Rel-17 S5-140-e

AI: 7.5.3

withdrawn [WTS] [JSN]
S5-216299 Clarifications into existing requirements CR NEC Europe Ltd 28.537 17.1.0 CR#8 catC 5GDMS Rel-17 S5-140-e

AI: 6.4.16

agreed [WTS] [JSN]
S5-216300 pCR draft TS28.104, add use case and requirements for MDA historical data pCR NEC Europe Ltd 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216301 Discussion on Intent Model discussion AsiaInfo Technologies Inc S5-140-e

AI: 6.4.

merged [WTS] [JSN]
S5-216302 Introduction of 5G DDNMF in charging architecture for 5GS CR

revised to S5-216492

CATT 32.24 17.3.0 CR#429 catB FS_5G_Prose_CH Rel-17 S5-140-e

AI: 7.4.4

revised [WTS] [JSN]
S5-216303 Introduction of 5G ProSe charging and high-level architecture CR

revised to S5-216505

CATT 32.277 16.0.0 CR#33 catB 5G_ProSe Rel-17 S5-140-e

AI: 7.4.4

revised [WTS] [JSN]
S5-216304 Add converged charging architecture for ProSe CR

revised to S5-216536

CATT 32.277 16.0.0 CR#34 catB 5G_ProSe Rel-17 S5-140-e

AI: 7.4.4

revised [WTS] [JSN]
S5-216305 Presentation of TR 32.846 for approval TS or TR cover

revised to S5-216576

CATT FS_5G_Prose_CH Rel-17 S5-140-e

AI: 7.5.3

revised [WTS] [JSN]
S5-216306 New R18 SID on Conflict management and coordination SID new Lenovo, Motorola Mobility Rel-18 S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216307 Rel-16 CR 28.552 Correct definition of Distribution of UL UE throughput in gNB CR Ericsson LM 28.552 16.11.0 CR#334 catF 5G_SLICE_ePA Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216308 pCR TR 28.824 add procedures related to product onboarding pCR

revised to S5-216585

AsiaInfo Technologies Inc 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216309 Discussion Paper on new R18 study for conflict management discussion Lenovo, Motorola Mobility Rel-18 S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216310 Rel-17 CR 28.552 Correct definition of Distribution of UL UE throughput in gNB CR Ericsson LM 28.552 17.4.0 CR#335 catA 5G_SLICE_ePA Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216311 Enhance Management Service to Support Access Control Procedures discussion Ericsson LM MSAC Rel-17 S5-140-e

AI: 6.4.23

endorsed [WTS] [JSN]
S5-216312 Rel-17 CR 28.540 Add requirements for NRM access control CR Ericsson LM 28.54 17.1.0 CR#16 catB MSAC Rel-17 S5-140-e

AI: 6.4.23

agreed [WTS] [JSN]
S5-216313 New Rel-18 SID AI/ML management SID new

revised to S5-216427

Intel, NEC, Orange, Verizon, China Telecom, China Unicom, Samsung, CATT, ZTE, AT&T, Deutsche Telekom, Telefónica S.A., Lenovo, Motorola Mobility, China Mobile, US Cellular, AsiaInfo Rel-18 S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216314 Rel-17 CR 28.541 Introduce missing attribute nrFreqRelationRef in table of attribute properties (stage2) CR

revised to S5-216540

Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#631 catF adNRM Rel-17 S5-140-e

AI: 6.4.4

revised [WTS] [JSN]
S5-216315 pCR 32.257 Add High-level 5G System architecture pCR

revised to S5-216507

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

revised [WTS] [JSN]
S5-216316 pCR 32.257 Add architecture for enabling edge applications pCR

revised to S5-216494

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

revised [WTS] [JSN]
S5-216317 pCR 32.257 Add Edge Computing domain converged charging architecture pCR

revised to S5-216495

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

revised [WTS] [JSN]
S5-216318 pCR 32.257 Add charging principles for 5GS usage charging for Edge Computing pCR

revised to S5-216496

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

revised [WTS] [JSN]
S5-216319 Conditional Handover services and procedures other

revised to S5-216613

Ericsson France S.A.S E_HOO Rel-17 S5-140-e

AI: 6.4.14

revised [WTS] [JSN]
S5-216320 DAPS handover services and procedures other

revised to S5-216614

Ericsson France S.A.S E_HOO Rel-17 S5-140-e

AI: 6.4.14

revised [WTS] [JSN]
S5-216321 DAPS handover Performance Measurements CR Ericsson France S.A.S 28.552 17.4.0 CR#336 catB E_HOO Rel-17 S5-140-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-216322 Clause number correction CR

revised to S5-216464

Ericsson France S.A.S 28.313 17.2.0 CR#41 catF eSON_5G Rel-17 S5-140-e

AI: 6.4.13

revised [WTS] [JSN]
S5-216323 Correct handover trigger CR Ericsson France S.A.S 28.313 16.1.0 CR#42 catC SON_5G Rel-16 S5-140-e

AI: 6.3

not pursued [WTS] [JSN]
S5-216324 Correct handover trigger CR

revised to S5-216433

Ericsson France S.A.S 28.313 17.2.0 CR#43 catC eSON_5G Rel-17 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216325 Correct maximumDeviationHoTrigger CR Ericsson France S.A.S 28.541 16.10.0 CR#632 catF SON_5G Rel-16 S5-140-e

AI: 6.3

not pursued [WTS] [JSN]
S5-216326 Correct maximumDeviationHoTrigger CR

revised to S5-221382

Ericsson France S.A.S 28.541 17.4.0 CR#633 catA SON_5G Rel-17 S5-140-e

AI: 6.3

not pursued [WTS] [JSN]
S5-216327 Correct wording and header CR Ericsson France S.A.S 28.552 17.4.0 CR#337 catF 5G_SLICE_ePA, TEI17 Rel-17 S5-140-e

AI: 6.3

endorsed [WTS] [JSN]
S5-216328 pCR 32.257 Add charging scenarios for 5GS usage charging for Edge Computing pCR

revised to S5-216510

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

revised [WTS] [JSN]
S5-216329 pCR 28.815 Update High-level 5G System architecture pCR

revised to S5-216509

Intel Sweden AB 28.815 1.3.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

revised [WTS] [JSN]
S5-216330 pCR 28.815 Update the possible solutions for aggregated charging pCR

revised to S5-216513

Intel Sweden AB 28.815 1.3.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

revised [WTS] [JSN]
S5-216331 Rel-16 CR 32.422 Update to include Trace Failure admin messages CR

revised to S5-216441

Ericsson LM 32.422 16.7.0 CR#380 catF 5GMDT Rel-16 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216332 Rel-17 CR 28.541 Correct attribute in IOC NRCellRelation (stage 3) CR

revised to S5-216541

Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#634 catF adNRM Rel-17 S5-140-e

AI: 6.4.4

revised [WTS] [JSN]
S5-216333 Rel-17 CR 32.422 Update to include trace failure admin messages CR

revised to S5-216442

Ericsson LM 32.422 17.4.0 CR#381 catA 5GMDT Rel-17 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216334 pCR 28.815 Add evaluation of edge application access charging via EAS pCR

revised to S5-216514

Intel Sweden AB 28.815 1.3.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

revised [WTS] [JSN]
S5-216335 pCR 28.104 Add use case and requirement for MDA assisted energy saving analysis pCR China Telecom, AsiaInfo 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

merged [WTS] [JSN]
S5-216336 Report from last SA5 meeting report

revision of S5-216001

MCC S5-140-e

AI: 4.1

approved [WTS] [JSN]
S5-216337 Rel-16 CR 32.422 Correction of IP Address of Trace Collection Entity CR Nokia, Nokia Shanghai Bell 32.422 16.7.0 CR#382 catF 5GMDT Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216338 pCR 28.104 Add MDA capability for MDA assisted energy saving analysis pCR China Telecom, AsiaInfo 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216339 Rel-17 CR 32.422 Correction of IP Address of Trace Collection Entity CR Nokia, Nokia Shanghai Bell 32.422 17.4.0 CR#383 catA 5GMDT Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216340 Presentation of TR 28.815 for approval pCR

revised to S5-216516

Intel Sweden AB 28.815 2.0.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

revised [WTS] [JSN]
S5-216341 Rel-17 CR TS 28.554 Add definition of 5GC energy efficiency (EE) KPI CR

revised to S5-216469

China Telecom 28.554 17.4.0 CR#88 catB EE5GPLUS Rel-17 S5-140-e

AI: 6.4.15

revised [WTS] [JSN]
S5-216342 pCR 28.104 Add requirements for ML model training pCR

revised to S5-216554

Intel 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216343 Rel-17 CR TS 28.622 Add condition information for threshold monitoring CR

revision of S5-215122

revised to S5-221160

Huawei 28.622 16.9.0 CR#1191 catB adNRM Rel-17 S5-140-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-216344 pCR 28.104 Add MnS producer initiated ML model training pCR

revised to S5-216555

Intel 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216345 pCR Add stage 2 structure for TS 28.104 pCR

revised to S5-216556

Intel, NEC, China Telecom, China Mobile, HUAWEI, CATT, AsiaInfo 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216346 DP on requesting a new TS number for AI&ML management discussion

revised to S5-216557

Intel, NEC eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216347 Rel-16 CR 28.622 Clarify behavior of NtfSubscriptionControl CR

revised to S5-216440

Nokia, Nokia Shanghai Bell 28.622 16.9.0 CR#125 catF eNRM Rel-16 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216348 Revised WID Enhancements of Management Data Analytics Service WID revised Intel, NEC eMDAS Rel-17 S5-140-e

AI: 6.4.18

agreed [WTS] [JSN]
S5-216349 New WID on network slicing provisioning rules WID new

revised to S5-216549

Ericsson Inc. S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216350 pCR 28.104 Add MDA capability for coverage problem analysis pCR Intel, NEC, HUAWEI 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216351 New SID on intent-driven network slicing management SID new

revised to S5-216578

Ericsson Inc. S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216352 Rel-16 CR 28.532 Correct spelling of notifyAlarmListRebuilt CR

revised to S5-216434

Nokia, Nokia Shanghai Bell 28.532 16.9.0 CR#193 catF NETSLICE, TEI16 Rel-16 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216353 pCR 28.104 Add common information elements of analytics outputs pCR Intel, NEC, China Telecom, HUAWEI 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

noted [WTS] [JSN]
S5-216354 CR Rel-17 28.552 Add measurements related to subscriber data management for UDM CR Intel 28.552 17.4.0 CR#338 catB ePM_KPI_5G Rel-17 S5-140-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-216355 CR Rel-17 28.552 Add measurements related to parameter provision for UDM CR Intel 28.552 17.4.0 CR#339 catB ePM_KPI_5G Rel-17 S5-140-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-216356 Motivation for a Feasibility Study on Network and Service Operations for Energy Verticals discussion Samsung, EUTC S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216357 LS reply to RAN3 on model deployment and update from OAM to NG-RAN LS out

LS is reply to S5-215029

LS To: RAN3

revised to S5-216423

Intel S5-140-e

AI: 6.1

revised [WTS] [JSN]
S5-216358 pCR 28.316 PnC Data formats - DHCP Request pCR Oy LM Ericsson AB 28.316 0.1.0 PACMAN Rel-17 S5-140-e

AI: 6.4.19

approved [WTS] [JSN]
S5-216359 New SID on Network and Service Operations for Energy Verticals SID new

revised to S5-216428

EUTC, Samsung, BMWi, Vodafone, Orange, Novamint Rel-18 S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216360 pCR TS 28.312 Add attributes of the IntentReport pCR AsiaInfo Technologies Inc 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

merged [WTS] [JSN]
S5-216361 Rel-17 CR 28.541 Introduce bidirectional association between NRCellDU and Beam CR Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#635 catB adNRM Rel-17 S5-140-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-216362 Add PM on Handover failures per beam related to MRO for intra-system mobility CR

revised to S5-216548

Nokia, Nokia Shanghai Bell 28.552 17.4.0 CR#340 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.6

revised [WTS] [JSN]
S5-216363 Add beam specific handover counters to MRO CR Nokia, Nokia Shanghai Bell 28.313 17.2.0 CR#44 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.13

agreed [WTS] [JSN]
S5-216364 Enhance 5G Core managed NF Profile NRM fragment (Stage 2) CR

revised to S5-216542

Nokia Germany, Orange, DT, Telefonica 28.541 17.4.0 CR#636 catB adNRM Rel-17 S5-140-e

AI: 6.4.4

revised [WTS] [JSN]
S5-216365 5GC NRM enhancements for ManagedNFProfile (Stage 3) CR

revised to S5-216543

Nokia Germany 28.541 17.4.0 CR#637 catB adNRM Rel-17 S5-140-e

AI: 6.4.4

revised [WTS] [JSN]
S5-216366 pCR 28.819 Rapp Cleanup pCR Lenovo, Motorola Mobility, CMCC 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216367 pCR - 28.819 Add Proposed overall process pCR Lenovo, Motorola Mobility, CMCC 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

noted [WTS] [JSN]
S5-216368 Add obtaining MDA output pCR

revised to S5-216478

Nokia Germany 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216369 Discussion on Requesting Management Data for a Geographical Area discussion Nokia, Nokia Shanghai Bell MADCOL Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216370 Management Data Collection Job in NRM discussion Nokia, Nokia Shanghai Bell Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216371 New SID Study on measurement data collection to support RAN intelligence SID new Intel Corporation (UK) Ltd, Verizon, AT&T, CMCC Rel-17 S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216372 Discussion paper for asynchronous solutions to support LCM other Intel Corporation (UK) Ltd S5-140-e

AI: 6.4.21

noted [WTS] [JSN]
S5-216373 Add MDA Request and Control pCR Nokia Germany 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

withdrawn [WTS] [JSN]
S5-216374 Discussion on structuring Rel-18 work in SA5 discussion

revised to S5-216551

Orange, Deutsche Telekom Rel-18 S5-140-e

AI: 6.1

revised [WTS] [JSN]
S5-216375 New SID on evaluation of autonomous network levels SID new

revised to S5-216429

China Mobile, Huawei, AsiaInfo, China Unicom, China Telecom, ZTE, CATT, Lenovo, Motorola Mobility, Intel Rel-18 S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216376 New SID on enhancement of autonomous network levels SID new

revision of S5-215165

revised to S5-216430

China Mobile, Huawei, AsiaInfo, China Unicom, China Telecom, ZTE, CATT, Lenovo, Motorola Mobility, Intel Rel-18 S5-140-e

AI: 6.2

revised [WTS] [JSN]
S5-216377 Add MDA Request and Control pCR

revised to S5-216479

Nokia Germany 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

revised [WTS] [JSN]
S5-216378 pCR 28.819 Add initial recomendations pCR

revised to S5-216593

Lenovo, Motorola Mobilty, CMCC 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

revised [WTS] [JSN]
S5-216379 pCR 28.819 Add release model details pCR Lenovo, Motorola Mobility, CMCC 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216380 pCR 28.819 Automated operational testing pCR

revised to S5-216588

Lenovo, Motorola Mobility, CMCC 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

revised [WTS] [JSN]
S5-216381 Rel-17 CR 28.623 Stage 3 YANG correction of _3gpp-common-trace CR Cisco Systems Belgium 28.623 16.9.0 CR#143 catF adNRM Rel-17 S5-140-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-216382 Add text to procedures related to management capability exposure pCR

revised to S5-216625

Ericsson LM, Deutsche Telekom 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216383 Clarifications on clause 4 overview pCR

revised to S5-216583

Ericsson LM, Deutsche Telekom 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216384 Clarifications on clause 5 use cases pCR

revised to S5-216586

Ericsson LM, Deutsche Telekom 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216385 Clarifications on clause 7 solutions pCR Ericsson LM, Deutsche Telekom 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216386 pCR 28.819 Providing detailed information for testing an NF pCR

revised to S5-216587

Lenovo, Motorola Mobility, CMCC 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

revised [WTS] [JSN]
S5-216387 CR Rel-17 28.531 Fixing NetworkSlice and NetworkSliceSubnet Allocation and Deallocation Stage 2 CR

revision of S5-215498

Ericsson LM, Deutsche Telekom 28.531 17.1.0 CR#882 catC eNETSLICE_PRO Rel-17 S5-140-e

AI: 6.4.24

not pursued [WTS] [JSN]
S5-216388 Discussion paper on on generalized approach to asynchronous network slicing procedures discussion Ericsson LM S5-140-e

AI: 6.4.24

noted [WTS] [JSN]
S5-216389 Correct spelling of Attribute properties CR Ericsson India Private Limited 28.541 17.4.0 CR#638 catA eNRM Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216390 Add network slice job class to NRM CR Ericsson LM 28.541 17.4.0 CR#639 catB DUMMY Rel-17 S5-140-e

AI: 6.4.24

not pursued [WTS] [JSN]
S5-216391 DP tenant representation in 3GPP management system discussion

revision of S5-213134

Ericsson, Deutsche Telekom eMEMTANE Rel-17 S5-140-e

AI: 6.4.7

noted [WTS] [JSN]
S5-216392 YANG Solution Set for Generic Radio Access Network NRM CR

revision of S5-215194

revised to S5-221416

Ericsson Hungary Ltd 28.663 16.0.0 CR#221 catB NSA_SBMA Rel-17 S5-140-e

AI: 6.4.22

not pursued [WTS] [JSN]
S5-216393 Clarify business requirement and correct punctuation CR Ericsson LM, Deutsche Telekom 28.535 16.4.0 CR#60 catF COSLA Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216394 Clarify communication service in requirement CSA-CON-06 CR

revised to S5-216435

Ericsson LM, Deutsche Telekom 28.535 16.4.0 CR#61 catF COSLA Rel-16 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216395 Clarify business requirement and correct punctuation CR Ericsson LM, Deutsche Telekom 28.535 17.3.0 CR#62 catA COSLA Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216396 Clarify communication service in requirement CSA-CON-06 CR

revised to S5-216436

Ericsson LM, Deutsche Telekom 28.535 17.3.0 CR#63 catA COSLA Rel-17 S5-140-e

AI: 6.3

revised [WTS] [JSN]
S5-216397 Discussion paper on composite management service for Cosla discussion Ericsson LM S5-140-e

AI: 6.4.12

noted [WTS] [JSN]
S5-216398 YANG Solution Set for Inventory Management CR

revision of S5-215110

revised to S5-221256

Ericsson Hungary Ltd 28.633 16.0.0 CR#91 catB NSA_SBMA Rel-17 S5-140-e

AI: 6.4.22

not pursued [WTS] [JSN]
S5-216399 Input to Draft CR 28.622 Define solution for data discovery draftCR Ericsson Telecomunicazioni SpA MADCOL Rel-17 S5-140-e

AI: 6.4.8

noted [WTS] [JSN]
S5-216400 Update intent information model pCR Ericsson Telecomunicazioni SpA 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

noted [WTS] [JSN]
S5-216401 DP on YANG solution set for Inventory discussion Ericsson Hungary Ltd NSA_SBMA Rel-17 S5-140-e

AI: 6.4.22

endorsed [WTS] [JSN]
S5-216402 Correct spelling of Attribute properties CR Ericsson India Private Limited 28.541 16.10.0 CR#640 catF eNRM Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216403 pCR 28.824 Exposure to SA6 applications or mddleware pCR

revised to S5-216623

Lenovo, Motorola Mobility 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

revised [WTS] [JSN]
S5-216404 Solution for National Roaming Scenario pCR Ericsson India Private Limited 28.811 0.7.0 FS_NSMEN Rel-17 S5-140-e

AI: 6.5.2

approved [WTS] [JSN]
S5-216405 Update WI for isolation use cases pCR Ericsson India Private Limited 28.811 0.7.0 FS_NSMEN Rel-17 S5-140-e

AI: 6.5.2

noted [WTS] [JSN]
S5-216406 Draft CR Rel 17 Add support for pause point draftCR Lenovo, Motorola Mobility eCOSLA Rel-17 S5-140-e

AI: 6.4.12

noted [WTS] [JSN]
S5-216407 IMS parts in 28.705 to YANG-YAML discussion Ericsson Hungary Ltd adNRM Rel-17 S5-140-e

AI: 6.4.4

noted [WTS] [JSN]
S5-216408 Rel-16 CR 32.240 Correction on converged charging architecture CR MATRIXX Software 32.24 16.4.0 CR#430 catF TEI16 Rel-16 S5-140-e

AI: 7.3

not pursued [WTS] [JSN]
S5-216409 Rel-17 CR 32.240 Correction on converged charging architecture CR MATRIXX Software 32.24 17.3.0 CR#431 catA TEI16 Rel-17 S5-140-e

AI: 7.3

not pursued [WTS] [JSN]
S5-216410 Rel-16 CR 32.240 Correction on charging architecture for management domain CR MATRIXX Software, Nokia 32.24 16.4.0 CR#432 catF TEI16 Rel-16 S5-140-e

AI: 7.3

not pursued [WTS] [JSN]
S5-216411 Rel-17 CR 32.240 Correction on charging architecture for management domain CR MATRIXX Software, Nokia 32.24 17.3.0 CR#433 catA TEI16 Rel-17 S5-140-e

AI: 7.3

not pursued [WTS] [JSN]
S5-216412 Reply to: LS cc SA5 on Prioritized Vehicle to Cloud Technical Solutions LS out

LS is reply to S5-216013

LS To: Automotive Edge Computing Consortium (AECC)

Huawei S5-140-e

AI: 5.3

approved [WTS] [JSN]
S5-216413 Reply to: LS ccSA5 on updating the readme.md file in 3GPP Forge LS out

LS is reply to S5-216026

LS To: CT3, CT4

Huawei S5-140-e

AI: 5.3

approved [WTS] [JSN]
S5-216414 Reply to: LS on the mapping between service types and slice at application LS out

LS is reply to S5-216016

LS To: RAN3

Ericsson S5-140-e

AI: 6.1

approved [WTS] [JSN]
S5-216415 Reply to: Reply LS on QoE configuration and reporting related issues LS out

LS is reply to S5-216019

LS To: RAN3

Ericsson S5-140-e

AI: 6.1

approved [WTS] [JSN]
S5-216416 Reply to: LS on Network slice information from OAM LS out

LS is reply to S5-216022

LS To: SA2

Ericsson S5-140-e

AI: 6.1

approved [WTS] [JSN]
S5-216417 Reply to: LS Reply on QoE report handling at QoE pause LS out

LS is reply to S5-216024

LS To: SA4

Ericsson S5-140-e

AI: 6.1

approved [WTS] [JSN]
S5-216418 Liaison Multi-SDO Autonomous Networks (AN) Formal Liaison: 22nd November 2021 Meeting Invitation, Agenda, Bridge, and Meeting Schedule Ref AN-SDO2021-13 LS in TMF S5-140-e

AI: 5.3

postponed [WTS] [JSN]
S5-216419 Reply to: LSout to 3GPP SA5 about MANO performance measurements accuracy to estimate VNF energy consumption LS out

LS is reply to S5-216032

LS To: ETSI ISG NFV

ORANGE S5-140-e

AI: 6.1

approved [WTS] [JSN]
S5-216420 Latest draft TR 28.817 draft TR Nokia FS_MNSAC Rel-17 S5-140-e

AI: 6.3

approved [WTS] [JSN]
S5-216421 Presentation sheet for SA approval of TR 28.817 TS or TR cover Nokia FS_MNSAC Rel-17 S5-140-e

AI: 6.3

approved [WTS] [JSN]
S5-216422 Rel-17 Input to DraftCR 28.623 file retrieval and download control NRM fragment, stage3 other Ericsson Rel-17 S5-140-e

AI: 6.4.

noted [WTS] [JSN]
S5-216423 LS to RAN3 on model deployment and update from OAM to NG-RAN LS out

LS is reply to S5-215029

LS To: RAN3

revision of S5-216357

Intel S5-140-e

AI: 6.1

approved [WTS] [JSN]
S5-216424 New SID on new aspects of EE for 5G networks Phase 2 SID new

revision of S5-216048

Orange Rel-18 S5-140-e

AI: 6.2

agreed [WTS] [JSN]
S5-216425 New WID on enhancements of EE for 5G phase 2 WID new

revision of S5-216049

Orange Rel-18 S5-140-e

AI: 6.2

agreed [WTS] [JSN]
S5-216426 New SID on deterministic communication service assurance SID new

revision of S5-216229

Huawei, China Mobile, CATT, China Unicom Rel-18 S5-140-e

AI: 6.2

agreed [WTS] [JSN]
S5-216427 New Rel-18 SID AI/ML management SID new

revision of S5-216313

Intel, NEC, Orange, Verizon, China Telecom, China Unicom, Samsung, CATT, ZTE, AT&T, Deutsche Telekom, Telefónica S.A., Lenovo, Motorola Mobility, China Mobile, US Cellular, AsiaInfo Rel-18 S5-140-e

AI: 6.2

agreed [WTS] [JSN]
S5-216428 New SID on Network and Service Operations for Energy Verticals SID new

revision of S5-216359

EUTC, Samsung, BMWi, Vodafone, Orange, Novamint Rel-18 S5-140-e

AI: 6.2

agreed [WTS] [JSN]
S5-216429 New SID on evaluation of autonomous network levels SID new

revision of S5-216375

China Mobile, Huawei, AsiaInfo, China Unicom, China Telecom, ZTE, CATT, Lenovo, Motorola Mobility, Intel Rel-18 S5-140-e

AI: 6.2

agreed [WTS] [JSN]
S5-216430 New SID on enhancement of autonomous network levels SID new

revision of S5-216376

China Mobile, Huawei, AsiaInfo, China Unicom, China Telecom, ZTE, CATT, Lenovo, Motorola Mobility, Intel Rel-18 S5-140-e

AI: 6.2

agreed [WTS] [JSN]
S5-216431 Rel-16 CR 28.310 Update energy saving solutions CR

revision of S5-216054

Huawei 28.31 16.5.0 CR#191 catF EE_5G Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216432 Rel-17 CR 28.310 Update energy saving solutions CR

revision of S5-216055

Huawei 28.31 17.2.0 CR#201 catA EE_5G Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216433 Correct handover trigger CR

revision of S5-216324

Ericsson France S.A.S 28.313 17.2.0 CR#431 catC eSON_5G Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216434 Rel-16 CR 28.532 Correct spelling of notifyAlarmListRebuilt CR

revision of S5-216352

Nokia, Nokia Shanghai Bell 28.532 16.9.0 CR#1931 catF NETSLICE, TEI16 Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216435 Clarify communication service in requirement CSA-CON-06 CR

revision of S5-216394

Ericsson LM, Deutsche Telekom 28.535 16.4.0 CR#611 catF COSLA Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216436 Clarify communication service in requirement CSA-CON-06 CR

revision of S5-216396

Ericsson LM, Deutsche Telekom 28.535 17.3.0 CR#631 catA COSLA Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216437 Rel-17 CR TS 28.541 Update inclusive language modification for TS 28.541 CR

revision of S5-216198

Huawei 28.541 17.4.0 CR#6191 catD TEI17 Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216438 network slice protection on N6 interface CR

revision of S5-216247

Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#6261 catB EMA5SLA Rel-17 S5-140-e

AI: 6.4.2

agreed [WTS] [JSN]
S5-216439 network slice specific authentication CR

revision of S5-216248

Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#6271 catB EMA5SLA Rel-17 S5-140-e

AI: 6.4.2

agreed [WTS] [JSN]
S5-216440 Rel-16 CR 28.622 Clarify behavior of NtfSubscriptionControl CR

revision of S5-216347

Nokia, Nokia Shanghai Bell 28.622 16.9.0 CR#1251 catF eNRM Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216441 Rel-16 CR 32.422 Update to include Trace Failure admin messages CR

revision of S5-216331

Ericsson LM 32.422 16.7.0 CR#3801 catF 5GMDT Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216442 Rel-17 CR 32.422 Update to include trace failure admin messages CR

revision of S5-216333

Ericsson LM 32.422 17.4.0 CR#3811 catA 5GMDT Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216443 Rel-16 CR 32.423 Introduce missing IEs for HSS and UDM Trace Record CR

revision of S5-216104

Nokia, Nokia Shanghai Bell 32.423 16.4.0 CR#1271 catF 5GMDT Rel-16 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216444 Rel-17 CR 32.423 Introduce missing IEs for HSS and UDM Trace Record CR

revision of S5-216105

Nokia, Nokia Shanghai Bell 32.423 17.2.0 CR#1281 catA 5GMDT Rel-17 S5-140-e

AI: 6.3

agreed [WTS] [JSN]
S5-216445 pCR 28.557 Update names for management modes of NPN pCR

revision of S5-216056

Huawei 28.557 1.1.0 OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

approved [WTS] [JSN]
S5-216446 Modification of network slice related requirements CR

revision of S5-216269

China Mobile 28.531 17.1.0 CR#981 catB EMA5SLA Rel-17 S5-140-e

AI: 6.4.2

agreed [WTS] [JSN]
S5-216447 Description of Information Elements of an Intent pCR

revision of S5-216042

Nokia Germany, Nokia Shanghai Bell, Huawei Asiainfo 28.312 0.5.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]
S5-216448 Extend Attributes of the Intent IOC pCR

revision of S5-216043

Nokia Germany 28.312 0.5.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]
S5-216449 pCR TS 28.312 Update the concept of intent in clause 4.1.3 pCR

revision of S5-216218

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]
S5-216450 pCR TS 28.312 Update the use case description to align with intent definition pCR

revision of S5-216219

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]
S5-216451 pCR TS 28.312 Add concept of intent translation pCR

revision of S5-216220

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]
S5-216452 pCR TS 28.312 Update intent life cycle management in Annex B.1 pCR

revision of S5-216221

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]
S5-216453 pCR TS 28.312 pCR TS 28.312 Add generic Intent management requirements pCR

revision of S5-216222

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]
S5-216454 pCR TS 28.312 Update RadioNetworkExpectation pCR

revision of S5-216224

Huawei 28.312 0.6.0 IDMS_MN Rel-17 S5-140-e

AI: 6.4.

noted [WTS] [JSN]
S5-216455 pCR 28.556 Add notificaition definition pCR

revision of S5-216119

China Mobile Com. Corporation 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

approved [WTS] [JSN]
S5-216456 pCR 28.556 Change stage 2 information attribute definition pCR

revision of S5-216120

China Mobile Com. Corporation 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

approved [WTS] [JSN]
S5-216457 pCR 28.556 update Policy activation and deactivation procedure pCR

revision of S5-216173

Huawei 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

approved [WTS] [JSN]
S5-216458 pCR 28.556 Add stage 3 definition pCR

revision of S5-216121

China Mobile Com. Corporation 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

approved [WTS] [JSN]
S5-216459 pCR 28.556 update PolicyContent definition pCR

revision of S5-216174

Huawei 28.556 0.4.0 NPM Rel-17 S5-140-e

AI: 6.4.11

approved [WTS] [JSN]
S5-216460 Rel-17 Input to draftCR S5-215550 TS 28.536 Updates to assurance report for eCOSLA draftCR

revision of S5-216230

Huawei Technologies Japan K.K. eCOSLA Rel-17 S5-140-e

AI: 6.4.12

approved [WTS] [JSN]
S5-216461 Rel-17 Input to draftCR S5-215550 TS 28.536 Add stage 3 SS definitions to assurance report for eCOSLA draftCR

revision of S5-216231

Huawei Technologies Japan K.K. eCOSLA Rel-17 S5-140-e

AI: 6.4.12

approved [WTS] [JSN]
S5-216462 Rel-17 CR 28.313 Add LBO use cases, requirements, and procedure CR

revision of S5-216040

Intel Corporation (UK) Ltd 28.313 17.2.0 CR#371 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.13

agreed [WTS] [JSN]
S5-216463 Rel-17 CR 28.313 Add C-SON CCO control information CR

revision of S5-216195

Huawei 28.313 17.2.0 CR#401 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.13

agreed [WTS] [JSN]
S5-216464 Clause number correction CR

revision of S5-216322

Ericsson France S.A.S 28.313 17.2.0 CR#411 catF eSON_5G Rel-17 S5-140-e

AI: 6.4.13

agreed [WTS] [JSN]
S5-216465 Rel-17 CR NRM for CHO CR

revision of S5-216050

Ericsson France S.A.S 28.541 17.4.0 CR#6081 catB E_HOO Rel-17 S5-140-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-216466 Rel-17 CR NRM for CHO Stage 3 CR

revision of S5-216051

Ericsson France S.A.S 28.541 17.4.0 CR#6091 catB E_HOO Rel-17 S5-140-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-216467 Rel-17 CR NRM for DAPS handover CR

revision of S5-216052

Ericsson France S.A.S 28.541 17.4.0 CR#6101 catB E_HOO Rel-17 S5-140-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-216468 Rel-17 CR NRM for DAPS handover Stage 3 CR

revision of S5-216053

Ericsson France S.A.S 28.541 17.4.0 CR#6111 catB E_HOO Rel-17 S5-140-e

AI: 6.4.14

agreed [WTS] [JSN]
S5-216469 Rel-17 CR TS 28.554 Add definition of 5GC energy efficiency (EE) KPI CR

revision of S5-216341

China Telecom 28.554 17.4.0 CR#881 catB EE5GPLUS Rel-17 S5-140-e

AI: 6.4.15

agreed [WTS] [JSN]
S5-216470 pCR 28.104 add inter-gNB beam selection optimization pCR

revision of S5-216268

China Mobile Com. Corporation 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216471 pCR 28.104 Replace alarm incident with alarm information pCR

revision of S5-216125

ZTE Corporation 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216472 pCR 28.104 Software Management usecase and requirements pCR

revision of S5-216127

Samsung Electronics France SA 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216473 pCR 28.104 Paging Optimization usecase and requirements pCR

revision of S5-216128

Samsung Electronics France SA 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216474 pCR 28.104 HO Optimization usecase and requirements pCR

revision of S5-216129

Samsung Electronics France SA 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216475 pCR 28.104 Alignment of terminology pCR

revision of S5-216175

Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216476 Rel-17 PCR TS 28.104 add coverage analysis requirement pCR

revision of S5-216185

Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216477 Rel-17 PCR TS 28.104 add MDA assisted Energy Saving use case and requirement pCR

revision of S5-216190

Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216478 Add obtaining MDA output pCR

revision of S5-216368

Nokia Germany 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216479 Add MDA Request and Control pCR

revision of S5-216377

Nokia Germany 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216480 pCR 28.104 Add E2E latency analysis use case and requirements pCR

revision of S5-216236

Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216481 pCR TS28.104 add MDA related data and usecase requirements pCR

revision of S5-216274

China Mobile 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216482 Collection of useful charging endorsed and external communication documents discussion

revised to S5-216506

Huawei S5-140-e

AI: 7.1

revised [WTS] [JSN]
S5-216483 CH agenda and time plan agenda

revision of S5-216008

WG vice Chair (Matrixx) S5-140-e

AI: 7.1

noted [WTS] [JSN]
S5-216484 Draft TS 32.257 draft TS Intel EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

approved [WTS] [JSN]
S5-216485 Draft TR 28.815 draft TR Intel FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

approved [WTS] [JSN]
S5-216486 Draft TR 28.816 draft TR Huawei FS_5G_CIoT_CH Rel-17 S5-140-e

AI: 7.5.2

approved [WTS] [JSN]
S5-216487 Draft TR 32.846 draft TR CATT FS_5G_Prose_CH Rel-17 S5-140-e

AI: 7.5.3

approved [WTS] [JSN]
S5-216488 Draft TR 28.822 draft TR Huawei FS_5GLAN_CH Rel-17 S5-140-e

AI: 7.5.4

approved [WTS] [JSN]
S5-216489 Draft TR 32.847 draft TR Matrixx FS_NETSLICE_CH Rel-17 S5-140-e

AI: 7.5.5

approved [WTS] [JSN]
S5-216490 Draft TR 28.826 draft TR Ericsson FS_NCHF_Ph2 Rel-17 S5-140-e

AI: 7.5.6

approved [WTS] [JSN]
S5-216491 Draft TR 28.827 draft TR Ericsson FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

approved [WTS] [JSN]
S5-216492 Introduction of 5G DDNMF in charging architecture for 5GS CR

revision of S5-216302

CATT 32.24 17.3.0 CR#4291 catB FS_5G_Prose_CH Rel-17 S5-140-e

AI: 7.4.4

agreed [WTS] [JSN]
S5-216493 Rel-17 CR 32.255 Addition of the 5G LAN service charging requirements CR

revision of S5-216147

Huawei 32.255 17.3.0 CR#3511 catB 5GLAN_CH Rel-17 S5-140-e

AI: 7.4.5

agreed [WTS] [JSN]
S5-216494 pCR 32.257 Add architecture for enabling edge applications pCR

revision of S5-216316

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

approved [WTS] [JSN]
S5-216495 pCR 32.257 Add Edge Computing domain converged charging architecture pCR

revision of S5-216317

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

approved [WTS] [JSN]
S5-216496 pCR 32.257 Add charging principles for 5GS usage charging for Edge Computing pCR

revision of S5-216318

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

approved [WTS] [JSN]
S5-216497 Rel-17 CR 32.255 Addition of the 5G LAN service charging in charging principle CR

revision of S5-216146

Huawei 32.255 17.3.0 CR#3501 catB 5GLAN_CH Rel-17 S5-140-e

AI: 7.4.5

agreed [WTS] [JSN]
S5-216498 Rel-17 CR 32.240 Addition of the 5G LAN service charging CR Huawei 32.24 17.3.0 CR#434 catB 5GLAN_CH Rel-17 S5-140-e

AI: 7.4.5

agreed [WTS] [JSN]
S5-216499 Rel-17 CR 32.281 Addition of IMS converged charging announcement CR

revision of S5-216073

Ericsson LM 32.281 17.0.0 CR#111 catB 5GSIMSCH Rel-17 S5-140-e

AI: 7.4.1

agreed [WTS] [JSN]
S5-216500 Rel-17 CR 32.275 Correction of references for converged charging CR

revision of S5-216075

Ericsson LM 32.275 17.2.0 CR#831 catF 5GSIMSCH Rel-17 S5-140-e

AI: 7.4.1

agreed [WTS] [JSN]
S5-216501 Rel-17 CR 32.291 Addition of MMTel converged charging information CR

revision of S5-216076

Ericsson LM 32.291 17.0.0 CR#3571 catB 5GSIMSCH Rel-17 S5-140-e

AI: 7.4.1

agreed [WTS] [JSN]
S5-216502 Rel-17 CR 32.291 Addition of IMS converged charging announcement CR

revision of S5-216074

Ericsson LM 32.291 17.0.0 CR#3561 catB 5GSIMSCH Rel-17 S5-140-e

AI: 7.4.1

agreed [WTS] [JSN]
S5-216503 New SID on Charging Aspects for Non-Public Networks SID new

revision of S5-216131

China Mobile Com. Corporation Rel-18 S5-140-e

AI: 7.2

agreed [WTS] [JSN]
S5-216504 Rel-17 pCR 28.816 Clean up pCR

revision of S5-216140

Huawei 28.816 1.1.0 FS_5G_CIoT_CH Rel-17 S5-140-e

AI: 7.5.2

approved [WTS] [JSN]
S5-216505 Introduction of 5G ProSe charging and high-level architecture CR

revision of S5-216303

CATT 32.277 16.0.0 CR#331 catB 5G_ProSe Rel-17 S5-140-e

AI: 7.4.4

agreed [WTS] [JSN]
S5-216506 Collection of useful charging endorsed and external communication documents discussion

revision of S5-216482

Huawei S5-140-e

AI: 7.1

noted [WTS] [JSN]
S5-216507 pCR 32.257 Add High-level 5G System architecture pCR

revision of S5-216315

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

approved [WTS] [JSN]
S5-216508 Presentation of TR 32.847 for information TS or TR cover Matrixx FS_NETSLICE_CH Rel-17 S5-140-e

AI: 7.5.5

approved [WTS] [JSN]
S5-216509 pCR 28.815 Update High-level 5G System architecture pCR

revision of S5-216329

Intel Sweden AB 28.815 1.3.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

approved [WTS] [JSN]
S5-216510 pCR 32.257 Add charging scenarios for 5GS usage charging for Edge Computing pCR

revision of S5-216328

Intel Sweden AB 32.257 0.1.0 EDGE_CH Rel-17 S5-140-e

AI: 7.4.2

approved [WTS] [JSN]
S5-216511 LS on Enhancement on Charging Identifier Uniqueness Mechanism LS out

LS To: CT4

Huawei S5-140-e

AI: 7.1

noted [WTS] [JSN]
S5-216512 Rel-17 pCR 28.815 Correction on CEF based architecuture in solution 7.4.4.9 pCR

revision of S5-216162

Huawei 28.815 1.3.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

approved [WTS] [JSN]
S5-216513 pCR 28.815 Update the possible solutions for aggregated charging pCR

revision of S5-216330

Intel Sweden AB 28.815 1.3.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

approved [WTS] [JSN]
S5-216514 pCR 28.815 Add evaluation of edge application access charging via EAS pCR

revision of S5-216334

Intel Sweden AB 28.815 1.3.0 FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

approved [WTS] [JSN]
S5-216515 Rel-17 CR 32.255 Addition of QoS Monitoring to Assist URLLC Service CR

revision of S5-215465

Huawei 32.255 17.3.0 CR#3382 catF 5G_URLLC Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216516 Presentation of TR 28.815 for approval TS or TR cover

revision of S5-216340

Intel Sweden AB FS_EDGE_CH Rel-17 S5-140-e

AI: 7.5.1

approved [WTS] [JSN]
S5-216517 Rel-17 pCR 28.822 Correction on the Reference pCR

revision of S5-216143

Huawei 28.822 0.5.0 FS_5GLAN_CH Rel-17 S5-140-e

AI: 7.5.4

approved [WTS] [JSN]
S5-216518 New Work Item on charging enhancement for 5GS CIoT WID new

revision of S5-216139

Huawei Rel-17 S5-140-e

AI: 7.2

agreed [WTS] [JSN]
S5-216519 Presentation of TR 28.816 for approval TS or TR cover Huawei FS_5G_CIoT_CH Rel-17 S5-140-e

AI: 7.5.2

approved [WTS] [JSN]
S5-216520 Presentation of TR 28.822 for information TS or TR cover Huawei FS_5GLAN_CH Rel-17 S5-140-e

AI: 7.5.4

approved [WTS] [JSN]
S5-216521 Rel-17 pCR 28.827 Correction on the potential charging architectures pCR

revision of S5-216157

Huawei 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

approved [WTS] [JSN]
S5-216522 Rel-17 pCR 32.847 New key issue on types of maximum pCR

revision of S5-216077

Ericsson LM 32.847 0.5.0 FS_NETSLICE_CH Rel-17 S5-140-e

AI: 7.5.5

approved [WTS] [JSN]
S5-216523 Rel-17 pCR 28.826 Use case trigger without usage pCR

revision of S5-216078

Ericsson LM 28.826 0.1.0 FS_NCHF_Ph2 Rel-17 S5-140-e

AI: 7.5.6

approved [WTS] [JSN]
S5-216524 Rel-16 CR 32.291 Update OpenAPI version CR Huawei 32.291 16.9.0 CR#359 catF TEI16 Rel-16 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216525 Rel-17 pCR 28.826 Use case size of charging information pCR

revision of S5-216081

Ericsson LM 28.826 0.1.0 FS_NCHF_Ph2 Rel-17 S5-140-e

AI: 7.5.6

approved [WTS] [JSN]
S5-216526 Rel-17 pCR 28.827 Adding reference point architecture to clause 7.1.4 pCR

revision of S5-216082

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

approved [WTS] [JSN]
S5-216527 Rel-17 pCR 28.827 Adding SBI architecture to clause 7.2.4 pCR

revision of S5-216083

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

approved [WTS] [JSN]
S5-216528 Rel-17 pCR 28.827 Adding reference point architecture to clause 7.3.4 pCR

revision of S5-216084

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

approved [WTS] [JSN]
S5-216529 Rel-17 pCR 28.827 Adding reference point architecture to clause 7.4.4 pCR

revision of S5-216085

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

approved [WTS] [JSN]
S5-216530 Rel-17 pCR 28.827 New use case MVNO without CHF pCR

revision of S5-216086

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

approved [WTS] [JSN]
S5-216531 Rel-17 pCR 28.827 New potential solution MVNO without CHF pCR

revision of S5-216087

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

approved [WTS] [JSN]
S5-216532 Rel-17 pCR 28.827 Adding reference point architecture to clause 7.5.4 pCR

revision of S5-216088

Ericsson LM 28.827 0.2.0 FS_CHROAM Rel-17 S5-140-e

AI: 7.5.7

approved [WTS] [JSN]
S5-216533 New SID on new network resource usage type for charging in the 5G System (5GS) SID new

revision of S5-216138

Huawei Rel-17 S5-140-e

AI: 7.2

noted [WTS] [JSN]
S5-216534 Rel-17 CR 32.255 Correcting home provided charging id and trigger at inter-PLMN V-SMF change CR

revision of S5-216072

Ericsson LM 32.255 17.3.0 CR#3481 catF TEI17 Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216535 Rel-17 CR 32.291 Update OpenAPI version CR Huawei 32.291 17.0.0 CR#358 catF TEI17 Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216536 Add converged charging architecture for ProSe CR

revision of S5-216304

CATT 32.277 16.0.0 CR#341 catB 5G_ProSe Rel-17 S5-140-e

AI: 7.4.4

agreed [WTS] [JSN]
S5-216537 Add beam level configuration parameter in NR CR

revision of S5-216136

Ericsson Japan K-K 32.422 17.4.0 CR#3791 catB e_5GMDT Rel-17 S5-140-e

AI: 6.4.3

agreed [WTS] [JSN]
S5-216538 Rel-17 Enhance NRM of UDM function CR

revision of S5-216271

China Mobile 28.541 17.4.0 CR#6291 catB adNRM Rel-17 S5-140-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-216539 TS28.541 CR Rel-17 Stage3 Update for UPF and PCF CR

revision of S5-216272

China Mobile 28.541 17.4.0 CR#6301 catF adNRM Rel-17 S5-140-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-216540 Rel-17 CR 28.541 Introduce missing attribute nrFreqRelationRef in table of attribute properties (stage2) CR

revision of S5-216314

Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#6311 catF adNRM Rel-17 S5-140-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-216541 Rel-17 CR 28.541 Correct attribute in IOC NRCellRelation (stage 3) CR

revision of S5-216332

Nokia, Nokia Shanghai Bell 28.541 17.4.0 CR#6341 catF adNRM Rel-17 S5-140-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-216542 Enhance 5G Core managed NF Profile NRM fragment (Stage 2) CR

revision of S5-216364

Nokia Germany, Orange, DT, Telefonica 28.541 17.4.0 CR#6361 catB adNRM Rel-17 S5-140-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-216543 5GC NRM enhancements for ManagedNFProfile (Stage 3) CR

revision of S5-216365

Nokia Germany 28.541 17.4.0 CR#6371 catB adNRM Rel-17 S5-140-e

AI: 6.4.4

agreed [WTS] [JSN]
S5-216544 Adding Signalling Based Activation for UTRAN and LTE CR

revision of S5-216089

Ericsson LM 28.405 16.1.0 CR#31 catB eQoE Rel-17 S5-140-e

AI: 6.4.5

agreed [WTS] [JSN]
S5-216545 Adding Management Based Activation and Temporary stop and restart during RAN overload in NR draftCR

revision of S5-216094

Ericsson LM eQoE Rel-17 S5-140-e

AI: 6.4.5

approved [WTS] [JSN]
S5-216546 Rel-17 CR 28.552 Add enhanced MIMO PRB Usage for cell CR

revision of S5-216133

China Unicom 28.552 17.4.0 CR#3331 catB ePM_KPI_5G Rel-17 S5-140-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-216547 Discussion on enhanced MIMO PRB Usage for cell discussion

revision of S5-216134

China Unicom ePM_KPI_5G Rel-17 S5-140-e

AI: 6.4.6

endorsed [WTS] [JSN]
S5-216548 Add PM on Handover failures per beam related to MRO for intra-system mobility CR

revision of S5-216362

Nokia, Nokia Shanghai Bell 28.552 17.4.0 CR#3401 catB eSON_5G Rel-17 S5-140-e

AI: 6.4.6

agreed [WTS] [JSN]
S5-216549 New WID on network slicing provisioning rules WID new

revision of S5-216349

Ericsson Inc. S5-140-e

AI: 6.2

agreed [WTS] [JSN]
S5-216550 pCR 28.557 Update NPN management aspects pCR

revision of S5-216060

Huawei 28.557 1.1.0 OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

approved [WTS] [JSN]
S5-216551 Discussion on structuring Rel-18 work in SA5 discussion

revision of S5-216374

Orange, Deutsche Telekom Rel-18 S5-140-e

AI: 6.1

endorsed [WTS] [JSN]
S5-216552 pCR 28.104 Add network slice instance load analysis use case and requirements pCR

revision of S5-216241

Huawei 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216553 pCR draft TS28.104 add slice coverage analysis pCR

revision of S5-216275

China Mobile 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216554 pCR 28.104 Add requirements for ML model training pCR

revision of S5-216342

Intel 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216555 pCR 28.104 Add MnS producer initiated ML model training pCR

revision of S5-216344

Intel 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216556 pCR Add stage 2 structure for TS 28.104 pCR

revision of S5-216345

Intel, NEC, China Telecom, China Mobile, HUAWEI, CATT, AsiaInfo 28.104 0.2.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216557 DP on requesting a new TS number for AI&ML management discussion

revision of S5-216346

Intel, NEC eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216558 pCR 28.315 PnC Procedure flows - minor updates pCR

revision of S5-216097

Oy LM Ericsson AB 28.315 0.2.0 PACMAN Rel-17 S5-140-e

AI: 6.4.19

approved [WTS] [JSN]
S5-216559 Rel-17 Input to DraftCR 28.622 Amend file retrieval NRM fragment other

revision of S5-216290

Nokia, Nokia Shanghai Bell FIMA Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]
S5-216560 Rel-17 CR 28.552 Add EAS data volume measurements CR

revision of S5-216109

Intel Corporation (UK) Ltd 28.552 17.4.0 CR#3321 catB ECM Rel-17 S5-140-e

AI: 6.4.21

agreed [WTS] [JSN]
S5-216561 pCR 28.538 add MnS information for EAS performance assurance pCR

revision of S5-216110

Intel Corporation (UK) Ltd 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

approved [WTS] [JSN]
S5-216562 pCR 28.538 add Provisioning MnS for Edge Computing pCR

revision of S5-216177

Huawei 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

approved [WTS] [JSN]
S5-216563 pCR 28.538 add transport view for EAS pCR

revision of S5-216178

Huawei 28.538 0.3.0 ECM Rel-17 S5-140-e

AI: 6.4.21

approved [WTS] [JSN]
S5-216564 CR Rel-17 TS 28.530 Add description for SBMA supporting manangement of 5G SA and NSA scenarios CR

revision of S5-216276

Huawei Technologies (Korea) 28.53 17.1.0 CR#511 catB NSA_SBMA Rel-17 S5-140-e

AI: 6.4.22

agreed [WTS] [JSN]
S5-216565 pCR TR 28.813 Change editor’s note to note in KI#3 pCR

revision of S5-216046

Orange 28.813 1.2.0 FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

approved [WTS] [JSN]
S5-216566 pCR 28.813 Update solution of Key Issue 6 pCR

revision of S5-216064

Huawei 28.813 1.2.0 FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

approved [WTS] [JSN]
S5-216567 Rel-16 CR 32.255 Correction on the User Location Time Description CR

revision of S5-216155

Huawei 32.255 16.10.0 CR#3521 catF TEI16 Rel-16 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216568 Rel-17 CR 32.255 Correction on the User Location Time Description CR

revision of S5-216156

Huawei 32.255 17.3.0 CR#3531 catA TEI16 Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216569 Rel-16 CR 32.291 Alignment of the charging data request and response CR

revision of S5-216158

Huawei 32.291 16.9.0 CR#3523 catF TEI16 Rel-16 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216570 Rel-17 CR 32.291 Alignment of the charging data request and response CR

revision of S5-216159

Huawei 32.291 17.0.0 CR#3533 catA TEI16 Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216571 Rel-16 CR 32.290 Addition of the Threshold based re-authorization triggers CR

revision of S5-216149

Huawei 32.29 16.9.0 CR#1711 catF TEI16 Rel-16 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216572 Rel-17 CR 32.290 Addition of the Threshold based re-authorization triggers CR

revision of S5-216150

Huawei 32.29 17.3.0 CR#1721 catA TEI16 Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216573 Rel-17 CR 32.290 Clarification on the immediate Report CR

revision of S5-216152

Huawei 32.29 17.3.0 CR#1741 catA TEI16 Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216574 Rel-17 CR 32.291 Addition of QoS Monitoring to Assist URLLC Service CR

revision of S5-216160

Huawei 32.291 17.0.0 CR#3543 catF 5G_URLLC Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216575 Rel-17 CR 32.298 Addition of QoS Monitoring to Assist URLLC Service CR

revision of S5-216161

Huawei 32.298 17.0.0 CR#8813 catF 5G_URLLC Rel-17 S5-140-e

AI: 7.3

agreed [WTS] [JSN]
S5-216576 Presentation of TR 32.846 for approval TS or TR cover

revision of S5-216305

CATT FS_5G_Prose_CH Rel-17 S5-140-e

AI: 7.5.3

approved [WTS] [JSN]
S5-216577 New Rel-18 WID on Enhanced intent driven management services for mobile network SID new

revision of S5-216091

Huawei, China Telecom, CATT, AsiaInfo, China Unicom, China Mobile Rel-18 S5-140-e

AI: 6.2

agreed [WTS] [JSN]
S5-216578 New SID on intent-driven network slicing management SID new

revision of S5-216351

Ericsson Inc. S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216579 New SID on PaaS for Virtualized Network Functions SID new

revision of S5-216243

China Mobile Com. Corporation Rel-18 S5-140-e

AI: 6.2

noted [WTS] [JSN]
S5-216580 Rel-15 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA CR

revision of S5-216211

revised to S5-221155

Huawei 28.658 15.6.0 CR#581 catF NETSLICE-5GNRM Rel-15 S5-140-e

AI: 6.3

not pursued [WTS] [JSN]
S5-216581 Rel-16 CR TS 28.658 Update EUTRAN NRM to be applicable for SBMA CR

revision of S5-216212

revised to S5-221156

Huawei 28.658 16.4.0 CR#591 catA NETSLICE-5GNRM Rel-16 S5-140-e

AI: 6.3

not pursued [WTS] [JSN]
S5-216582 pCR 28.824 Concept definition for Exposed Management Service pCR

revision of S5-216181

Huawei 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216583 Clarifications on clause 4 overview pCR

revision of S5-216383

Ericsson LM, Deutsche Telekom 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216584 Discussion Paper on exposure scenario discussion

revision of S5-216282

Alibaba Group, AsiaInfo Rel-17 S5-140-e

AI: 6.5.4

endorsed [WTS] [JSN]
S5-216585 pCR TR 28.824 add procedures related to product onboarding pCR

revision of S5-216308

AsiaInfo Technologies Inc 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216586 Clarifications on clause 5 use cases pCR

revision of S5-216384

Ericsson LM, Deutsche Telekom 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216587 pCR 28.819 Providing detailed information for testing an NF pCR

revision of S5-216386

Lenovo, Motorola Mobility, CMCC 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216588 pCR 28.819 Automated operational testing pCR

revision of S5-216380

Lenovo, Motorola Mobility, CMCC 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216589 pCR 28.819 Solution of providing vendor feedback pCR

revision of S5-216251

China Mobile Com. Corporation, Lenovo, Motorola Mobility 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216590 pCR 28.819 Solution of environment data collection pCR

revision of S5-216253

China Mobile Com. Corporation, Lenovo, Motorola Mobility 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216591 Latest draft TS 28.312 draft TS Huawei IDMS_MN Rel-17 S5-140-e

AI: 6.4.

withdrawn [WTS] [JSN]
S5-216592 pCR 28.819 Use case of test data analysis pCR

revision of S5-216255

China Mobile Com. Corporation, Lenovo, Motorola Mobility 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216593 pCR 28.819 Add initial recomendations pCR

revision of S5-216378

Lenovo, Motorola Mobilty, CMCC 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216594 TR 28.925 Add key issue on modelling of MnF pCR

revision of S5-216233

Huawei Technologies (Korea) 28.925 0.2.0 FS_eSBMA Rel-17 S5-140-e

AI: 6.5.6

approved [WTS] [JSN]
S5-216595 SID revised was SP-210136 SID on enhancement of service based management architecture SID revised

revision of S5-216281

Huawei Technologies (Korea) FS_eSBMA Rel-17 S5-140-e

AI: 6.5.6

agreed [WTS] [JSN]
S5-216596 DraftCR for eCOSLA - TS 28.536 draftCR Ericsson eCOSLA Rel-17 S5-140-e

AI: 6.4.12

approved [WTS] [JSN]
S5-216597 DraftCR for FIMA TS 28.622 draftCR Nokia FIMA Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]
S5-216598 Latest draft TS 28.557 draft TS Huawei OAM_NPN Rel-17 S5-140-e

AI: 6.4.1

approved [WTS] [JSN]
S5-216599 Latest draft TS 28.100 draft TS China Mobile ANL Rel-17 S5-140-e

AI: 6.4.9

approved [WTS] [JSN]
S5-216600 Latest draft TS 28.556 draft TS China Mobile NPM Rel-17 S5-140-e

AI: 6.4.11

approved [WTS] [JSN]
S5-216601 Latest draft TS 28.104 draft TS Intel eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216602 Latest draft TS 28.314 draft TS Ericsson PACMAN Rel-17 S5-140-e

AI: 6.4.19

approved [WTS] [JSN]
S5-216603 Latest draft TS 28.315 draft TS Ericsson PACMAN Rel-17 S5-140-e

AI: 6.4.19

approved [WTS] [JSN]
S5-216604 Latest draft TS 28.316 draft TS Ericsson PACMAN Rel-17 S5-140-e

AI: 6.4.19

approved [WTS] [JSN]
S5-216605 Latest draft TS 28.538 draft TS Samsung ECM Rel-17 S5-140-e

AI: 6.4.21

approved [WTS] [JSN]
S5-216606 Latest draft TR 28.813 draft TR ORANGE FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

approved [WTS] [JSN]
S5-216607 Latest draft TR 28.811 draft TR Huawei FS_NSMEN Rel-17 S5-140-e

AI: 6.5.2

approved [WTS] [JSN]
S5-216608 Latest draft TR 28.824 draft TR Alibaba FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216609 Latest draft TR 28.819 draft TR Lenovo FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216610 Latest draft TR 28.925 draft TR Huawei, Ericsson FS_eSBMA Rel-17 S5-140-e

AI: 6.5.6

approved [WTS] [JSN]
S5-216611 Latest draft TR 28.825 draft TR China Unicom FS_MANS Rel-17 S5-140-e

AI: 6.5.7

approved [WTS] [JSN]
S5-216612 pCR 28.813 Update impact on normative work of Key Issue 4 pCR

revision of S5-216065

Huawei 28.813 1.2.0 FS_EE5G Rel-17 S5-140-e

AI: 6.5.1

approved [WTS] [JSN]
S5-216613 Conditional Handover services and procedures other

revision of S5-216319

Ericsson France S.A.S E_HOO Rel-17 S5-140-e

AI: 6.4.14

approved [WTS] [JSN]
S5-216614 DAPS handover services and procedures other

revision of S5-216320

Ericsson France S.A.S E_HOO Rel-17 S5-140-e

AI: 6.4.14

approved [WTS] [JSN]
S5-216615 Presentation sheet for approval of TR 28.811 TS or TR cover

revision of S5-216172

Huawei FS_NSMEN Rel-17 S5-140-e

AI: 6.5.2

approved [WTS] [JSN]
S5-216616 Add Use Case for the exposure without going through BSS pCR

revision of S5-216283

Alibaba Group, AsiaInfo 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216617 Exposure of network slice as a service pCR

revision of S5-216284

Alibaba Group, AsiaInfo 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216618 Rel-15 CR TS 28.658 Update Generic RAN NRM to be applicable for SBMA CR

revision of S5-216213

revised to S5-221158

Huawei 28.662 15.3.0 CR#121 catF NETSLICE-5GNRM Rel-15 S5-140-e

AI: 6.3

not pursued [WTS] [JSN]
S5-216619 Rel-16 CR TS 28.658 Update Generic RAN NRM to be applicable for SBMA CR

revision of S5-216214

revised to S5-221159

Huawei 28.662 16.0.0 CR#131 catA NETSLICE-5GNRM Rel-16 S5-140-e

AI: 6.3

not pursued [WTS] [JSN]
S5-216620 Rel-17 CR 28.541 Stage 3 YANG updates for stage 2 CRs 214164, 585-8 CR

revision of S5-216093

Cisco Systems Belgium 28.541 17.4.0 CR#6141 catC adNRM Rel-17 S5-140-e

AI: 6.4.4

not pursued [WTS] [JSN]
S5-216621 DraftCR for E-HOO - TS 28.313 draftCR Ericsson E_HOO Rel-17 S5-140-e

AI: 6.4.14

approved [WTS] [JSN]
S5-216622 Rel-17 pCR TS 28.104 Add MDA analysis report reporting related service component pCR

revision of S5-216194

Huawei 28.104 17.0.0 eMDAS Rel-17 S5-140-e

AI: 6.4.18

approved [WTS] [JSN]
S5-216623 pCR 28.824 Exposure to SA6 applications or mddleware pCR

revision of S5-216403

Lenovo, Motorola Mobility 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216624 Consolidate potential requirements of use cases for eMnS discovery service pCR

revision of S5-216285

Alibaba Group 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216625 Add text to procedures related to management capability exposure pCR

revision of S5-216382

Ericsson LM, Deutsche Telekom 28.824 0.3.0 FS_NSCE Rel-17 S5-140-e

AI: 6.5.4

approved [WTS] [JSN]
S5-216626 pCR 28.819 Describe ETSI NFV testing framework pCR

revision of S5-216180

Huawei 28.819 0.3.0 FS_CICDNS Rel-17 S5-140-e

AI: 6.5.5

approved [WTS] [JSN]
S5-216627 pCR 28.825 Add analysis and comparison of potential solutions pCR

revision of S5-216116

ZTE, China Unicom 28.825 0.2.0 FS_MANS Rel-17 S5-140-e

AI: 6.5.7

approved [WTS] [JSN]
S5-216628 Reply to: LS on the Beam measurement reports for the MDT measurements LS out

LS is reply to S5-216021

source LS: S5-215030

LS To: RAN3

revision of S5-216137

Ericsson Rel-17 S5-140-e

AI: 6.1

approved [WTS] [JSN]
S5-216629 Latest draft TS 28.312 draft TS Huawei IDMS_MN Rel-17 S5-140-e

AI: 6.4.

approved [WTS] [JSN]

630 documents (1.0986649990082 seconds)