Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S2-142944 | Draft Agenda for SA WG2 meeting #105 | other | SA WG2 Chairman | S2-105 | - | [WTS] [JSN] | |||
S2-142945 | Draft Report of SA WG2 meeting #104 | other | SA WG2 Secretary | S2-105 | - | [WTS] [JSN] | |||
S2-142946 | SA WG2 chairman's report on SA#65 | other | SA WG2 Chairman | S2-105 | - | [WTS] [JSN] | |||
S2-142947 | LS from RAN WG2: Reply LS on Provisioning of ProSe configuration information in a public safety ProSe enabled UE | other | RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-142948 | Forwarded LS: WBA Carrier Wi-Fi Liaison Statement |
other revised to S2-143813 |
WBA | S2-105 | - | [WTS] [JSN] | |||
S2-142949 | LS from IEEE 802.11: Liaison on WLAN signal measurements for WLAN/3GPP Radio interworking | other | IEEE 802.11 | S2-105 | - | [WTS] [JSN] | |||
S2-142950 | LS from CT WG1: Reply LS on solutions for the failure of CONF service after eSRVCC |
other revised to S2-143814 |
CT WG1 | S2-105 | - | [WTS] [JSN] | |||
S2-142951 | LS from CT WG1: Reply LS on WLAN/3GPP Radio Interworking | other | CT WG1 | S2-105 | - | [WTS] [JSN] | |||
S2-142952 | LS from CT WG1: New QCIs for MCPTT Signalling and Voice | other | CT WG1 | S2-105 | - | [WTS] [JSN] | |||
S2-142953 | LS from CT WG1: Reply LS on LS TR 26.924 Study on improved end-to-end QoS handling (S4-140688) | other | CT WG1 | S2-105 | - | [WTS] [JSN] | |||
S2-142954 | LS from CT WG3: LS Response on introducing the EVS codec in MTSI | other | CT WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-142955 | LS from CT WG3: LS Reply on TR 26.924 Study on improved end-to-end QoS handling | other | CT WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-142956 | LS from CT WG4: LS on Deferred ULI change reporting until a PFC is established | other | CT WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142957 | LS from CT WG4: LS Reply on TR 26.924 Study on improved end-to-end QoS handling | other | CT WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142958 | LS from CT WG4: LS Response on introducing the EVS codec in MTSI | other | CT WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142959 | LS from CT WG4: LS on Overload control for Transparent Single-Connection mode | other | CT WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142960 | LS from CT WG4: LS on S1-U tunnel switch for Dual Connectivity |
other revised to S2-143815 |
CT WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142961 | LS from RAN WG1: Reply LS on eNB knowledge of low complexity UEs | other | RAN WG1 | S2-105 | - | [WTS] [JSN] | |||
S2-142962 | LS from RAN WG1: Reply LS on introducing the EVS codec in MTSI | other | RAN WG1 | S2-105 | - | [WTS] [JSN] | |||
S2-142963 | LS from RAN WG2: LS on WLAN/3GPP Radio Interworking WLAN metrics | other | RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-142964 | LS from GSMA RILTE: LS on Service Data Synchronization |
other revised to S2-143816 |
GSMA RILTE | S2-105 | - | [WTS] [JSN] | |||
S2-142965 | LS from SA WG1: Reply LS on availability of ProSe Direct Communication in limited service state |
other revised to S2-143817 |
SA WG1 | S2-105 | - | [WTS] [JSN] | |||
S2-142966 | LS from SA WG4: Reply LS on stage 2 related aspects of introducing the EVS codec in MTSI | other | SA WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142967 | LS from SA WG4: LS on handling of E2EMTSI WI in Rel-12 and Rel-13 | other | SA WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142968 | LS from SA WG4: Reply LS on Applicability of MI-MooD to GCSE | other | SA WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142969 | LS from SA WG4: Reply LS on eMBMS broadcast areas with EUTRAN Cell Granularity | other | SA WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142970 | LS from SA WG5: Reply LS on ProSe Lawful Interception | other | SA WG5 | S2-105 | - | [WTS] [JSN] | |||
S2-142971 | LS from oneM2M: Proposed answer to TP-2014-0448-LS_from_OMA_ARC | other | oneM2M | S2-105 | - | [WTS] [JSN] | |||
S2-142972 | PDN-connection based solution for delivery of message destined for a group - Overview | other | Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-142973 | PDN-connection based solution for delivery of message destined for a group | other | Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-142974 | Combined HSS, PCC, and MME/SGSN Approach | other | Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-142975 | LS from WBA Community Wi-Fi project team: Community Wi-Fi white paper |
other revised to S2-143818 |
WBA Community Wi-Fi project team | S2-105 | - | [WTS] [JSN] | |||
S2-142976 | LS from GSMA: Liaison statement regarding GSMA Wi-Fi PRD TS.22 Version 3 Publication | other | GSMA | S2-105 | - | [WTS] [JSN] | |||
S2-142977 | LS from TSG GERAN: LS on Introduction of Power Saving Mode in GERAN | other | TSG GERAN | S2-105 | - | [WTS] [JSN] | |||
S2-142978 | LS from RAN WG1: LS on ProSe provisioning parameters | other | RAN WG1 | S2-105 | - | [WTS] [JSN] | |||
S2-142979 | LS from RAN WG2: LS on introduction of shorter MCH scheduling period | other | RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-142980 | LS from RAN WG2: Reply LS on eMBMS broadcast areas with EUTRAN Cell Granularity | other | RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-142981 | LS from RAN WG2: LS on WLAN/3GPP radio interworking WI completion | other | RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-142982 | LS from RAN WG2: Reply LS on the impacts of packet marking on RAN user plane handling of DL traffic |
other revised to S2-143819 |
RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-142983 | LS from RAN WG2: Reply LS on clarifications about MOCN and GWCN | other | RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-142984 | LS from RAN WG3: Response LS on the Impacts of Packet Marking on RAN user plane handling of DL traffic |
other revised to S2-143820 |
RAN WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-142985 | LS from RAN WG3: Reply LS on S1-U tunnel switch for Dual Connectivity |
other revised to S2-143821 |
RAN WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-142986 | LS from RAN WG3: Reply LS on eNB knowledge of low complexity UEs | other | RAN WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-142987 | LS from SA WG3: Reply LS on Reply LS on ProSe Lawful Interception – UICC based charging | other | SA WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-142988 | LS from SA WG3: LS on assumptions for out of network coverage discovery | other | SA WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-142989 | LS from SA WG4: LS Response on Introducing the EVS codec in MTSI | other | SA WG4 | S2-105 | - | [WTS] [JSN] | |||
S2-142990 | LS from SA WG5: Reply LS from SA WG5 to TSG SA on Maintenance of I-WLAN Solution | other | SA WG5 | S2-105 | - | [WTS] [JSN] | |||
S2-142991 | Update to Key issue - 'Group-specific NAS Level Congestion Control' | other | DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-142992 | Non-3GPP to 3GPP access handover related issues | other | Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-142993 | Correction to handover procedures between non-3GPP and 3GPP access when GTP based S2a/S2b is used | CR | Cisco, T-Mobile USA | S2-105 | - | [WTS] [JSN] | |||
S2-142994 | Clarification to non-3GPP access to 3GPP access handover procedure | CR | Cisco, T-Mobile USA | S2-105 | - | [WTS] [JSN] | |||
S2-142995 | LS from TSG SA: LS on 3GPP work organization for Mission Critical Push to Talk | other | TSG SA | S2-105 | - | [WTS] [JSN] | |||
S2-142996 | LS from OMA: LS Response to ETSI TCCE WG4 proposal for joint follow up working session | other | OMA | S2-105 | - | [WTS] [JSN] | |||
S2-142997 | Clarification on how to get LCS accurate cell identity | CR | China Mobile, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-142998 | Clarification on how to get LCS accurate cell identity | CR | China Mobile, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-142999 | Nq' interface support for Gn/Gp-SGSN | CR | China Mobile, Huawei, China Unicom, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143000 | Tdoc Deadlines for future meetings | other | SA WG2 Chairman | S2-105 | - | [WTS] [JSN] | |||
S2-143001 | Applicability of congestion information reporting for certain APNs only | CR | Allot Communications, Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-143002 | Support for multiple RCAFs | other | Cisco, Allot Communications, AT&T, KDDI | S2-105 | - | [WTS] [JSN] | |||
S2-143003 | Clarifying details of deferred services | CR | Cisco, Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143004 | Interim Conclusions for MONTE | other | Cisco Systems Inc., Intel, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143005 | Updated Key-issues and Evaluation section based on new SA WG1 SEES requirements | other | Cisco Systems Inc. | S2-105 | - | [WTS] [JSN] | |||
S2-143006 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom | S2-105 | - | [WTS] [JSN] | |||
S2-143007 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom | S2-105 | - | [WTS] [JSN] | |||
S2-143008 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom | S2-105 | - | [WTS] [JSN] | |||
S2-143009 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143010 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143011 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143012 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143013 | [DRAFT] LS on Indication of resource sharing over Gx | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143014 | Understanding of the requirements for supporting Np mobility | other | ZTE, NSN | S2-105 | - | [WTS] [JSN] | |||
S2-143015 | Fundamental design issues for Np mobility procedures | other | China Telecom, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143016 | Merged Annex-X Proposal for NBIFOM | other | Oracle, ZTE, Broadcom Corp., CATT, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143017 | Selection of method for delivery of Group Message to group of devices | other | ZTE, AT&T, KPN, Sierra Wireless | S2-105 | - | [WTS] [JSN] | |||
S2-143018 | Identification and Discovery of Service Capabilities | other | ZTE, NTTDoCoMo | S2-105 | - | [WTS] [JSN] | |||
S2-143019 | New WID: Usage Monitoring Control PCC Extension | other | China Telecom, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143020 | Introducing the feature of excluding Usage of a Service/Application from IP-CAN session/TDF session Usage into the specification | CR | China Telecom, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent ShangHai Bell, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143021 | Architecture overview | other | AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143022 | Roaming models | other | AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143023 | Migration registration | other | AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143024 | Signalling channel | other | AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143025 | Unicast media bearer |
other revised to S2-144093 |
AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143026 | Broadcast media bearer | other | AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143027 | Specification Reference Review and Revision Planning | other | SA WG2 Chairman | S2-105 | - | [WTS] [JSN] | |||
S2-143028 | 2016 Meeting Calendar | other | SA WG2 Chairman | S2-105 | - | [WTS] [JSN] | |||
S2-143029 | EAP based routing rules transmission via TWAN in SCM |
other revised to S2-143877 |
CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143030 | Delete the editor's notes about the routing rule transmission via re-authentication | other | CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143031 | Support of third party interaction | other | CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143032 | Consideration about the ProSe UE-UE Relay | other | CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143033 | Solution for restricted ProSe direct discovery | other | CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143034 | Considerations for ProSe one to one communication and service continuity aspects |
other revised to S2-143882 |
CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143035 | The authorization of the application in the VPLMN | CR | CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143036 | Enable ISR for PS-only UE | CR | CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143037 | Enable ISR for PS-only UE | CR | CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143038 | Proposed WID for Flexible Mobile Service Steering (FMSS) | other | China Mobile, Alcatel-Lucent, Alcatel-Lucent ShangHai Bell, China Telecom, Orange, China Unicom | S2-105 | - | [WTS] [JSN] | |||
S2-143039 | FMSS TR Skeleton |
other revised to S2-144114 |
China Mobile, Allot Communications, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143040 | Scope of FMSS TR |
other revised to S2-144115 |
China Mobile, Allot Communications, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143041 | Media components of a session put on hold | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143042 | Access policy information over Gx | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom Corporation | S2-105 | - | [WTS] [JSN] | |||
S2-143043 | Key issue: Co-ordination between the UE and the network to take into account radio conditions (quality and/or load) | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143044 | Comments on some 'open issues' of the 'Merged Annex-X Proposal for NBIFOM' | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143045 | [DRAFT] Reply LS on the impacts of packet marking on RAN user plane handling of DL traffic | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143046 | How the PCRF provides information on the services / applications to be excluded from Usage monitoring | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143047 | Update Solution of Group based messaging using cell broadcast to support AESE framework |
other revised to S2-144024 |
HTC, Alcatel-Lucent, NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143048 | Solution 1: SIP-MESSAGE-based SRVCC Enhancement for Transcoding avoidance | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143049 | Solution 2 - Precondition-based SRVCC Enhancement for Transcoding avoidance | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143050 | Architectural Requirements | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143051 | 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects;Study on SRVCC enhancements for Transcoding Avoidance | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143052 | Solution 2 - Single HSS Subscription (Architecture, Procedures and Call flows) | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143053 | Rx Resource Sharing Information | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143054 | P-CSCF Information Reporting Shared resources | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143055 | TR skeleton for FS_HLcom Optimizations to Support High Latency Communications | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143056 | Scope for the HLcom TR | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143057 | Scenario for DL packet transmission to UE applying sleep function | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143058 | Scenario for Enabler for coordinated DL transmission | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143059 | Scenario for coordination of max latency between the application and the network |
other revised to S2-143938 |
Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143060 | Potential Solution for buffering at DL transmission to PSM | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143061 | Congestion control based on IP address | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143062 | APN based group congestion control |
other revised to S2-143941 |
Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143063 | Subscription information for DCOR | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143064 | Detailing solution 2 'Re-routing before NAS security setup' | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143065 | CSPS Coordination General Description | CR | Ericsson, TeliaSonera | S2-105 | - | [WTS] [JSN] | |||
S2-143066 | Example signalling flows | CR | Ericsson, Telia Sonera | S2-105 | - | [WTS] [JSN] | |||
S2-143067 | Example logics for CSPS Coordination | CR | Ericsson, Telia Sonera | S2-105 | - | [WTS] [JSN] | |||
S2-143068 | Functional Description | CR | Ericsson, Telia Sonera | S2-105 | - | [WTS] [JSN] | |||
S2-143069 | Indication to share resources in the UL or DL or both directions | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143070 | Event notifications using PCC solution for MONTE | other | Ericsson, Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143071 | Charging correlation identifier for the IP-CAN session | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143072 | Charging correlation identifier for the IP-CAN session | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143073 | New Annex: Monitor service usage in multiple groups | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143074 | WLCP Security | CR | Ericsson, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shangai Bell, Nokia Networks, Nokia Corporation | S2-105 | - | [WTS] [JSN] | |||
S2-143075 | PCC aspects of NBIFOM | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143076 | ProSe UE to Network Relay supporting unicast and multicast | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143077 | Mobility handling on the Np interface | other | Ericsson, Cisco, Allot Communications | S2-105 | - | [WTS] [JSN] | |||
S2-143078 | Np mobility handling | CR | Ericsson, Cisco, Allot Communications, AT&T | S2-105 | - | [WTS] [JSN] | |||
S2-143079 | Resolution of Editor's note on bandwidth limitation. | CR | Ericsson, Cisco, Allot Communications | S2-105 | - | [WTS] [JSN] | |||
S2-143080 | Resolution of editor's note on Nq' interface support | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143081 | Resolution of editor's note on location information | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143082 | Handling of E-UTRAN Inter RAT Handover information at PS Handover from GERAN | CR | Ericsson, Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143083 | Handling of E-UTRAN Inter RAT Handover information at PS Handover from GERAN | CR | Ericsson, Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143084 | Handling of E-UTRAN Inter RAT Handover information at PS Handover from GERAN | CR | Ericsson, Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143085 | Handling of E-UTRAN Inter RAT Handover information in Gb mode | CR | Ericsson, Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143086 | Handling of E-UTRAN Inter RAT Handover information in Gb mode | CR | Ericsson, Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143087 | Handling of E-UTRAN Inter RAT Handover information in Gb mode | CR | Ericsson, Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143088 | CS security key derivation for eCSFB | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143089 | eCSFB solution evaluation | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143090 | Exposure architecture | other | Ericsson, Alcatel-Lucent, Intel, Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-143091 | Paging enhancements for Low Complexity UE | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143092 | Paging enhancements for Low Complexity UE | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143093 | ProSe Multi-Carrier scenarios | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143094 | RAN WG2 alignments for ProSe Multi-Carrier support | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143095 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143096 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143097 | Resolving the TFT filter setting for UL filters | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143098 | Permission for the MS to omit uplink TFT packet filter among own filters | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143099 | Permission for the MS to omit uplink TFT packet filter among own filters | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143100 | Permission for the MS to omit uplink TFT packet filter among own filters | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143101 | Alignment of TFT packet filter usage with 2G/3G | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143102 | Alignment of TFT packet filter usage with 2G/3G | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143103 | Alignment of TFT packet filter usage with 2G/3G | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143104 | Removal of the PCRF obligation to include an uplink SDF packet filter in all PCC rules | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143105 | Removal of the PCRF obligation to include an uplink SDF packet filter in all PCC rules | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143106 | Removal of the PCRF obligation to include an uplink SDF packet filter in all PCC rules | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143107 | Correction of the CN assisted eNodeB parameter tuning | CR | Ericsson, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143108 | Correction of the CN assisted eNodeB parameter tuning | CR | Ericsson, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143109 | ProSe Authorization revisited | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143110 | ProSe in Limited Service State | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143111 | Pending Subscription Change | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143112 | Pending Subscription Change | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143113 | Pending Subscription Change | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143114 | Pending Subscription Change | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143115 | ProSe Authorization | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143116 | Way forward for updating serving VPLMN ID information | other | HTC | S2-105 | - | [WTS] [JSN] | |||
S2-143117 | Clarification on updating information of the VPLMN ID | CR | HTC | S2-105 | - | [WTS] [JSN] | |||
S2-143118 | Resolving issue of the ProSe direct service disruption | CR | HTC | S2-105 | - | [WTS] [JSN] | |||
S2-143119 | Clarification on the Monitor Request Procedure | CR | HTC | S2-105 | - | [WTS] [JSN] | |||
S2-143120 | Clarification of the Monitor Request and Match Report Procedures | CR | HTC | S2-105 | - | [WTS] [JSN] | |||
S2-143121 | LS from BBF: Broadband Forum Work on 'Hybrid Access for Broadband Networks' (WT-348) | other | BBF | S2-105 | - | [WTS] [JSN] | |||
S2-143122 | MMEGI/NRI for dedicated networks re-selection | other | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143123 | Core Network Type value consideration in Solution 2. | other | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143124 | LS from RAN WG3: Response LS on Core Network Assisted eNodeB parameters tuning | other | RAN WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-143125 | Support of NSWO with RAN-based solution | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143126 | Support of non-seamless offloading with RAN rules | CR | Samsung, Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143127 | Support of non-seamless offloading with RAN rules | CR | Samsung, Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143128 | Support of non-seamless offloading with RAN rules | CR | Samsung, Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143129 | Support of non-seamless offloading with RAN rules | CR | Samsung, Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143130 | Correction on the APN usage in ANDSF | CR | Samsung, Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143131 | Additional GUTI for the dedicated MME | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143132 | Correction on the existing solution for re-routing | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143133 | NBIFOM solution for operation mode negotiation | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143134 | Considerations on ProSe Relays Selection | other | Sony | S2-105 | - | [WTS] [JSN] | |||
S2-143135 | Co-existence of UE-initiated and Network-initiated handling for implicitly-triggered IP flow mobility | other | Sony | S2-105 | - | [WTS] [JSN] | |||
S2-143136 | New Work Item Description on IMS Centralized Services enhancements | other | Deutsche Telekom, TeliaSonera, T-Mobile US, NEC, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143137 | Discussion on enhanced IMS Centralized Services | other | Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143138 | TR skeleton for eICS | other | Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143139 | Updates to Solution 1 and Solution 2 for initial MME/SGSN assignment at TAU and HO | other | NTT DOCOMO, Ericsson? | S2-105 | - | [WTS] [JSN] | |||
S2-143140 | Updates to Solution 1 and Solution 2 for HSS Initiated CN Type Change | other | NTT DOCOMO, Ericsson? | S2-105 | - | [WTS] [JSN] | |||
S2-143141 | Support of inter-PLMN mobility and heterogeneous deployment of dedicated network | other | NTT DOCOMO, TeliaSonera, Vodafone? | S2-105 | - | [WTS] [JSN] | |||
S2-143142 | Clarification of PGW and SGW Selection | other | NTT DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143143 | Clarification of DNS Requirements for DCOR | other | NTT DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143144 | Criteria for comparing the different Solutions | other | NTT DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143145 | ProSe Application ID authorization | CR | ZTE, Telecom Italia | S2-105 | - | [WTS] [JSN] | |||
S2-143146 | Clarification on Equivalent PLMN | CR | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143147 | Solution of ProSe Direct Discovery Model B | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143148 | Abbreviations - addition and correction | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143149 | Clarification on Proximity Request Reject related to GERAN/UTRAN | CR | LG Electronics, Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143150 | References fix | CR | LG Electronics, Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143151 | ProSe Application Code with valid location for announcing in open ProSe direct discovery |
other revised to S2-144152 |
LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143152 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143153 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143154 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143155 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143156 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143157 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143158 | [DRAFT] Clarification of GCS AS use of MBMS Delivery Methods | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143159 | MONTE PCR - Correction for Loss of Connectivity | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143160 | MONTE PCR - Corrections for Monitoring via HSS | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143161 | MONTE PCR - Note on Change of Location | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143162 | [DRAFT] Clarification of Monitoring Requirements | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143163 | HLCOM PCR - Solution X - Notification via HSS | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143164 | SEES Normative Requirements Analysis | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143165 | Update to solution#3 | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143166 | MME triggered re-direction to dedicated MME | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143167 | Adding abbreviations for 3GPP Radio/WLAN interworking | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143168 | Adding/Fixing the reference on RAN rule based solution | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143169 | Clarification on the RAN assistance parameters based on RAN WGs agreements | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143170 | Clarification on the RAN assistance parameters based on RAN WGs agreements | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143171 | Clarification on the RAN assistance parameters based on RAN WGs agreements | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143172 | Clarification on the RAN assistance parameters based on RAN WGs agreements | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143173 | Co-existence of UE-initiated and Network-initiated handling | other | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143174 | UE-initiated NBIFOM solution for S2b | other | Apple Inc. | S2-105 | - | [WTS] [JSN] | |||
S2-143175 | Group identifier for NAS level congestion control |
other revised to S2-144000 |
NTT DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143176 | Correction of references for SWu tunnel establishment | CR | Nokia Networks, Nokia Corporation | S2-105 | - | [WTS] [JSN] | |||
S2-143177 | Clarification on equivalent service providers | CR | Nokia Networks, Nokia | S2-105 | - | [WTS] [JSN] | |||
S2-143178 | Alignment of the specification of discovery filters with stage 3 specifications | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143179 | Welcome to SA WG2#105_Sapporo | other | NTT DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143180 | Removal of priority handling characteristic for One-to-many ProSe Direct Communication | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143181 | Clarification on Service Continuity from MBMS delivery to Unicast delivery | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143182 | Solution Proposal - Reusing MONTE solution |
other revised to S2-144081 |
LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143183 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143184 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143185 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143186 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143187 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143188 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143189 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143190 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143191 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143192 | Clarifications for Multimedia Priority Services | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143193 | Clarifications for Multimedia Priority Services | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143194 | Core Network assisted RAN parameters tuning for UMTS | CR | Huawei, Hisilicon, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143195 | E-UTRAN initiated E-RAB modification procedure update | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143196 | Provision of Validity Timer to VPLMN ProSe Function | CR | Huawei, Hisilicon, Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143197 | VPLMN usage in monitor and match report procedures | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143198 | Clarification on Discovery procedure in roaming case | CR | Huawei, Hisillicon | S2-105 | - | [WTS] [JSN] | |||
S2-143199 | Clarifications for priority related PCRF actions | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143200 | Clarifications for QoS change of default bearer | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143201 | Clarifications for QoS change of default bearer | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143202 | Priority of Default Bearer | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143203 | Priority of Default Bearer | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143204 | Clarification of WLAN offload indication from MME in E-UTRAN | CR | Huawei, HiSilicon, CATT, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143205 | Clarification of WLAN offload indication from MME in E-UTRAN | CR | Huawei, HiSilicon, CATT, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143206 | Clarification of WLAN offload indication from SGSN in UTRAN | CR | Huawei, HiSilicon, CATT, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143207 | Clafication of WLAN offload indication from SGSN in UTRAN | CR | Huawei, HiSilicon, CATT, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143208 | Interface between IM-SSF and HSS | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143209 | Interface between IM-SSF and HSS | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143210 | Interface between IM-SSF and HSS | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143211 | Interface between IM-SSF and HSS | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143212 | Discussion for supplementaryservice data setting | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143213 | Supplementaryservice data setting in CS network | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143214 | Supplementary service data setting in CS network | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143215 | Enhancements for the FPI solution | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143216 | Null-NRI based redirect for 2G and 3G Attach | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143217 | The DECOR subscription information | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143218 | HSS-initiated Dedicated CN Node Reselection | other | Huawei, Hisilicon, InterDigital | S2-105 | - | [WTS] [JSN] | |||
S2-143219 | Update of null-NRI/null-MMEGI based redirection during Attach | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143220 | Evaluation of solutions for initial assignment of a CN | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143221 | Routing rule delivery and revision of NBIFOM procedure |
other revised to S2-143989 |
Huawei, | S2-105 | - | [WTS] [JSN] | |||
S2-143222 | Routing Rule Negotiation | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143223 | Transferring Routing Rule via Gx | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143224 | Evaluation on Solution 1 AESE Architecture | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143225 | Setting up data sessions with specified QoS and Priority | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143226 | Changing chargeable party | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143227 | Exposure of Multimedia Call Control Capabilities | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143228 | IMS based Service Capability Exposure from User Equipments | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143229 | Update of T5 solution | other | Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143230 | Report on UE roaming status to 3rd party | other | Huawei, HiSilicon, KPN | S2-105 | - | [WTS] [JSN] | |||
S2-143231 | Reporting location change information to 3rd party | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143232 | Solutions on Message delivery to a group of devices | other | Huawei, HiSilicon, KPN | S2-105 | - | [WTS] [JSN] | |||
S2-143233 | Impacts of SRVCC based eCSFB on existing nodes and functionality |
other revised to S2-143995 |
Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143234 | Architecture Evaluation | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143235 | Decomposed Architecture for The Enterprise PBX Scenario | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143236 | E2E Media Transport | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143237 | eWebRTCi Flexible Service Control | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143238 | ProSe UE-to-Network Relay with eMBMS | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143239 | Solution for SETA | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143240 | Consideration on updating Document References to external SDOs in 3GPP SA2 specifications | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143241 | Application-specific ProSe Code for Restricted Discovery | other | Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143242 | Cell ID announcement in ProSe UE-to-Network relays | other | Alcatel-lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143243 | On ProSe UE ID | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143244 | Analysis of HLCOM solution space | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143245 | Leverage of Predictable Communication Patterns of a UE |
other revised to S2-144060 |
NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143246 | T4 message delivery to a group of devices | other | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143247 | 'Group based Policy Control' removal of editor's notes and added solution | other | KPN | S2-105 | - | [WTS] [JSN] | |||
S2-143248 | Scope clarification for ProSe Direct Discovery | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143249 | Correction on ME provisioning information related to selected USIM | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143250 | Flows for support an unbounded number of users | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143251 | Update of WID on Coordinated P-GW change for SIPTO (CSIPTO) | other | Samsung, Intel, China Mobile, China Unicom, China Telecom, China Academy of Telecommunications Technology, Orange, Sprint, Sony Mobile Communication, InterDigital, ACER, NEC, LG. | S2-105 | - | [WTS] [JSN] | |||
S2-143252 | Traffic mapping for traffic matching a rule using deep packet inspection | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143253 | Traffic mapping for traffic matching a rule using deep packet inspection | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143254 | Traffic mapping for traffic matching a rule using deep packet inspection | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143255 | Traffic mapping for traffic matching a rule using deep packet inspection | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143256 | Traffic mapping for traffic matching a rule using deep packet inspection | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143257 | Traffic mapping for traffic matching a rule using deep packet inspection | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143258 | Traffic mapping to generate from a PCC rule with application id | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143259 | Traffic mapping to generate from a PCC rule with application id | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143260 | Traffic mapping to generate from a PCC rule with application id | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143261 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143262 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143263 | Work Split between SA WG2 and SA WG6 | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143264 | Architectural Assumptions | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143265 | MCPTT scenarios and overall architecture | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143266 | Assigment of ProSe UE ID for broadcast or when bearer-level security is not used | CR | Intel, Alcatel-Lucent, Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143267 | Solution for One-to-One Communication | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143268 | Solution for ProSe UE-Network and ProSe UE-UE Relays | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143269 | Solution for Public Safety Discovery | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143270 | System-, application- and IMS-level considerations for Network Mode Operation via Relay (NMO-R) | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143271 | System- and application-level considerations for Direct Mode Operation via Relay (DMO-R) | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143272 | Correction of 'extended wait timers' in RRC signalling | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143273 | Correction of 'extended wait timers' in RRC signalling | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143274 | Correction of 'extended wait timers' in RRC signalling | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143275 | Correction of 'extended wait timers' in RRC signalling | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143276 | Corrections to APN based and General NAS level MM congestion control | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143277 | Corrections to APN based and General NAS level MM congestion control | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143278 | Corrections to APN based and General NAS level MM congestion control | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143279 | Corrections to APN based and General NAS level MM congestion control | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143280 | EAB initiation in BSC | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143281 | EAB initiation in BSC | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143282 | EAB initiation in BSC | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143283 | EAB initiation in BSC | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143284 | Support for flexible BFCP | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143285 | Support for flexible BFCP | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143286 | UE evaluation of threshold conditions | CR | Motorola Mobility | S2-105 | - | [WTS] [JSN] | |||
S2-143287 | Clarifications and Enhancements for Implicitly-Triggered IP Flow Mobility | other | Motorola Mobility | S2-105 | - | [WTS] [JSN] | |||
S2-143288 | Update of Solution based on Implicitly-Triggered IP Flow Mobility | other | Motorola Mobility | S2-105 | - | [WTS] [JSN] | |||
S2-143289 | Co-existence Considerations | other | Motorola Mobility | S2-105 | - | [WTS] [JSN] | |||
S2-143290 | Correction to the Low Access Priority Indication use by the network. | CR | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143291 | Correction to the Low Access Priority Indication use by the network. | CR | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143292 | Correction to the Low Access Priority Indication use by the network. | CR | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143293 | Correction to the Low Access Priority Indication use by the network. | CR | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143294 | Restricted ProSe Direct Discovery procedures | other | Telecom Italia, Qualcomm Incorporated, Huawei, Hisilicon, Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143295 | Discovery Filters & discovery permissions changes | other | Telecom Italia | S2-105 | - | [WTS] [JSN] | |||
S2-143296 | Distinguishing support for DMO Group and Private Calls |
other revised to S2-144119 |
General Dynamics UK Ltd. | S2-105 | - | [WTS] [JSN] | |||
S2-143297 | Isolated E-UTRAN Operation for Public Safety (IOPS) | other | General Dynamics UK Ltd | S2-105 | - | [WTS] [JSN] | |||
S2-143298 | Update of WID for Isolated E-UTRAN Operation for Public Safety | other | General Dynamics UK Ltd | S2-105 | - | [WTS] [JSN] | |||
S2-143299 | Correction to Delay Budget for first packets in a data burst | CR | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143300 | Correction to Delay Budget for first packets in a data burst | CR | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143301 | Long Group Calls and New Cells | CR | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143302 | One-to-one ProSe Direct Communication considerations | other | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143303 | ProSe Direct Discovery for Public Safety use | other | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143304 | ProSe Direct Communication scheduling | other | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143305 | Scheduling for one-to-many ProSe Direct Communication | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143306 | Addition of Application Identity in Discovery Report | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143307 | Complete removal conditional authorization | CR | Qualcomm Incorporated, Telecom Italia | S2-105 | - | [WTS] [JSN] | |||
S2-143308 | Support for ProSe for UE in limited service state | CR | Qualcomm Incorporated, UK Home Office, US Department of Commerce | S2-105 | - | [WTS] [JSN] | |||
S2-143309 | Per country radio resource configuration for Public Safety UEs | CR | Qualcomm Incorporated, UK Home Office, Alcatel-Lucent, US Department of Commerce | S2-105 | - | [WTS] [JSN] | |||
S2-143310 | Options for MCPTT floor control over PC5 |
other revised to S2-143977 |
Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143311 | [DRAFT] Reply LS on assumptions for out of network coverage discovery | other | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143312 | Identifiers for ProSe Restricted Discovery | other | Qualcomm Incorporated, Huawei, Hisilicon, Telecom Italia, Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143313 | ProSe UE-Network Relay principles and issues | other | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143314 | Communication failure and abnormal communication | other | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143315 | MCPTT 'Floor' control for ProSe Direct Communication | other | Telefnica UK | S2-105 | - | [WTS] [JSN] | |||
S2-143316 | QCI assignments for MCPTT - Potential impacts on other services | other | Applied Communication Sciences, Office of Emergency Communications | S2-105 | - | [WTS] [JSN] | |||
S2-143317 | Limiting Event Monitoring Solutions | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143318 | Removing Secondary PDP context activation procedure without TFT | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143319 | Removing Secondary PDP context activation procedure without TFT | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143320 | Removing Secondary PDP context activation procedure without TFT | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143321 | Requiring to always have TFT in Secondary PDP context for E-UTRAN capable device | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143322 | Requiring to always have TFT in Secondary PDP context for E-UTRAN capable device | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143323 | Requiring to always have TFT in Secondary PDP context for E-UTRAN capable device | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143324 | Extended DRX cycle for Power Consumption Optimization | other | Qualcomm Incorporated, Ericsson, ZTE, Sierra Wireless, Verizon, AT&T, China Unicom | S2-105 | - | [WTS] [JSN] | |||
S2-143325 | Motivation for WID on Extended DRX cycle for Power Consumption Optimization | other | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143326 | UE aspects of SRVCC based CSFB | other | Qualcomm Incorporated, Huawei, HiSilicon, China Unicom | S2-105 | - | [WTS] [JSN] | |||
S2-143327 | Key Issue on SCS/AS Notification/Request for Group PSM Usage | other | InterDigital | S2-105 | - | [WTS] [JSN] | |||
S2-143328 | Solution for Key Issue on SCS/AS Notification/Request for Group PSM Usage | other | InterDigital | S2-105 | - | [WTS] [JSN] | |||
S2-143329 | Identifiers for restricted discovery | other | InterDigital Communications | S2-105 | - | [WTS] [JSN] | |||
S2-143330 | Procedures for Model B Restricted Discovery (non-public safety) | other | InterDigital Communications | S2-105 | - | [WTS] [JSN] | |||
S2-143331 | Procedure when UE loses WLAN connectivity |
other revised to S2-144127 |
InterDigital Communications | S2-105 | - | [WTS] [JSN] | |||
S2-143332 | Uncertainly with solution 1 regarding TI value and TI flag setting | other | Samsung, Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143333 | eCSFB with IMS#1 | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143334 | eCSFB with IMS#2 | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143335 | key issue for enhanced codec (e.g., EVS, WB-AMR) | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143336 | key issue for multi-call scenario | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143337 | Proposal for SRVCC transcodingless operation | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143338 | Correction and Impacts for Solution#2 |
other revised to S2-144142 |
Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143339 | Evaluation for Solution#2 |
other revised to S2-144143 |
Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143340 | Solution to skip authentication procedure in CS during CSFB | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143341 | Suggestions for proposed new GCSE enhancements WID | other | Motorola Solutions | S2-105 | - | [WTS] [JSN] | |||
S2-143342 | High Level View of the Architectural Environment for MCPTT | other | Motorola Solutions | S2-105 | - | [WTS] [JSN] | |||
S2-143343 | Way Forward and Analysis of MBMS Congestion and Disruption Solutions | other | Motorola Solutions | S2-105 | - | [WTS] [JSN] | |||
S2-143344 | Proposals in support of ProSe UE-Network Relay | other | HTC | S2-105 | - | [WTS] [JSN] | |||
S2-143345 | Proposal in support of Open ProSe Direct Discovery for Model B | other | HTC | S2-105 | - | [WTS] [JSN] | |||
S2-143346 | Requirements for interaction of Trusted applications with SCEF | other | Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-143347 | ProSe Group Member Discovery for Public Safety use | other | ITRI | S2-105 | - | [WTS] [JSN] | |||
S2-143348 | Admission control and pre-emption for ProSe UE-to-Network Relays |
other revised to S2-144220 |
ITRI | S2-105 | - | [WTS] [JSN] | |||
S2-143349 | Solution for loss of WLAN coverage |
other revised to S2-143990 |
Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143350 | Modification of Rel-12 MTC architecture with API-GWF | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143351 | Target UE Restricted ProSe Direct Discovery | other | Huawei, Hisilicon, Telecom Italia, Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143352 | Non Target UE Restricted ProSe Direct Discovery | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143353 | Service Data Synchronisation (related with LSin GSMA RILTE S2-142964) | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143354 | [DRAFT] LS on Service data synchronisation | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143355 | Deferring Services as mitigation method | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143356 | Deferring Services as mitigation method for UPCON | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143357 | Adding interoperabilty aspects between RAN and CN for the CN-based solution | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143358 | UE identifier retrieval procedure | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143359 | Correlation between Cells and UEs | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143360 | Considerations on solution 1 supporting class of users | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143361 | Solution for WebRTC support of IMS subscriptions corresponding to users managed by third parties | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143362 | IMS based MCPTT Architecture Proposal | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143363 | Update of section 5 solution 1: (Single HSS subscription for an unbounded number of users) Flow for a re-registration and for an incoming session | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143364 | Discussion on architecture and MT procedure for user managed by 3rd party | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143365 | Adding new architecture to support 'user managed by 3rd party' | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143366 | Discussion on re-negotiation method for TrFO | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143367 | Adding re-negotiation method for TrFO after SRVCC | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143368 | Np mobility scenario analysis and proposal | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143369 | New WID on MBMS Enhancements | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143370 | Support for new QCI values | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143371 | Identification of source during group communication | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143372 | TMGI renewal | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143373 | Fixing Standardized QCI characteristics table | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143374 | Fixing Standardized QCI characteristics table | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143375 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143376 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143377 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143378 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143379 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143380 | Solution X: MME triggered S1 handover | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143381 | Correction of S4-SGSN-Initiated PDP Context Modification Procedure | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143382 | Correction of CSFB priority for eMPS to GERAN | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143383 | Correction to deferred ULI reporting for GERAN | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143384 | [DRAFT] LS on Deferred ULI change reporting until a PFC is established | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143385 | Correction to TSCM Initial Attach | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143386 | Correction to GTP-c overload control in TSCM | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143387 | Introduction of RSSI into ANDSF | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Interdigital Communications, Qualcomm Incorporated, Intel, Broadcom Corporation, Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143388 | Redirection without detaching the UE in TAU based solutions | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143389 | Redirection without detaching the UE in MME triggered S1 handover solution | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143390 | Paging policy differentiation for IMS voice | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon | S2-105 | - | [WTS] [JSN] | |||
S2-143391 | Discussion on the alternatives for the transport of paging differentiation information in EPC | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143392 | Use of low access priority for GERAN access | CR | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143393 | Use of low access priority for GERAN access | CR | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143394 | Use of low access priority for GERAN access | CR | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143395 | Scenario for UE clock drifting | other | Nokia Networks, Nokia Corp. | S2-105 | - | [WTS] [JSN] | |||
S2-143396 | Issue with two simultaneous calls in Solution #1, MO call | other | Nokia Networks, Nokia Corp, Samsung, Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143397 | Issue with handover failure in Solution #1 | other | Nokia Networks, Nokia Corp, Samsung, Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143398 | Paging without LAI | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143399 | Solution for loss of WLAN coverage for implicitly triggered IP flow Mobility | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143400 | High Level MCPTT Architecture | other | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143401 | Location reporting over Np | other | Cisco, Allot Communications, Orange, China Telecom, AT&T, KDDI, Sandvine Incorporated, Broadcom Corporation, Openet, Oracle, ZTE, Comverse, Hitachi, IAESI, Movik Networks, Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143402 | Transfer of location information on Np | CR | Cisco, Allot Communications, Orange, China Telecom, AT&T, KDDI, Sandvine Incorporated, Broadcom Corporation, Openet, Oracle, ZTE, Comverse, Hitachi, IAESI, Movik Networks, Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143403 | Update of section 6 solution 1: (WTPF) | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143404 | BM-SC to support Delivery Status reporting function | CR | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143405 | Fix on the figure of monitoring request | CR | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143406 | Availabilty of proximtiy service for the ProSe-enabled UE | CR | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143407 | Direct communication between the remote UE and the UE-to-NW relay | CR | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143408 | ProSe Discovery for Public Safety use | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143409 | ProSe UE-NW relays to support ProSe discovery for remote UEs | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143410 | Revised eWebRTCi WID for changing of SA2 rapporteur | other | China Mobile | S2-105 | - | [WTS] [JSN] | |||
S2-143411 | System-, application- and IMS-level considerations for MCPTT service continuity (NMO to NMO-R) |
other revised to S2-144289 |
Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143412 | Distributed floor control for MCPTT Direct Mode Operation (DMO) |
other revised to S2-144291 |
Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143413 | [DRAFT] Reply LS on Reply LS (S4-141051) on Applicability of MI-MooD to GCSE | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143414 | [DRAFT] LS on Overload control for Transparent Single-Connection mode | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143415 | S1-U tunnel switch for Dual Connectivity | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143416 | S1-U tunnel switch for Dual Connectivity | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143417 | LS from RAN WG3: LS on Group Call eMBMS congestion management for LTE. | other | RAN WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-143418 | LS from RAN WG3: Reply LS on Introducing the ProSe Authorized IE |
other revised to S2-143822 |
RAN WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-143419 | LS from RAN WG3: Reply LS on allowing optional category for LTE | other | RAN WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-143420 | LS from RAN WG3: Reply LS on MME control for consistence of S1-U and S1-MME address type |
other revised to S2-143823 |
RAN WG3 | S2-105 | - | [WTS] [JSN] | |||
S2-143421 | LS from RAN WG2: Reply LS on the problem of UE Radio Capability information size | other | RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143422 | LS from RAN WG2: Reply LS on availability of ProSe Direct Communication in limited service state |
other revised to S2-143824 |
RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143423 | LS from RAN WG2: Access Control for Prose (Discovery and Communication) |
other revised to S2-143825 |
RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143424 | LS from RAN WG2: LS on ProSe group priorities |
other revised to S2-143826 |
RAN WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143425 | Draft Agenda for SA WG2 meeting #105 | other | SA WG2 Chairman | S2-105 | - | [WTS] [JSN] | |||
S2-143426 | P-CSCF Information Reporting Shared resources | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143427 | Indication to share resources in the UL or DL or both directions | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143428 | Media components of a session put on hold | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143429 | Introduction of RSSI into ANDSF | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Interdigital Communications, Qualcomm Incorporated, Intel, Broadcom Corporation, Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143430 | Clarification of WLAN offload indication from MME in E-UTRAN | CR | Huawei, HiSilicon, CATT, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143431 | Clarification of WLAN offload indication from MME in E-UTRAN | CR | Huawei, HiSilicon, CATT, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143432 | Clarification of WLAN offload indication from SGSN in UTRAN | CR | Huawei, HiSilicon, CATT, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143433 | Clafication of WLAN offload indication from SGSN in UTRAN | CR | Huawei, HiSilicon, CATT, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143434 | UE evaluation of threshold conditions | CR | Motorola Mobility | S2-105 | - | [WTS] [JSN] | |||
S2-143435 | Clarifying details of deferred services | CR | Cisco, Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143436 | Clarification on the RAN assistance parameters based on RAN WGs agreements | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143437 | Clarification on the RAN assistance parameters based on RAN WGs agreements | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143438 | Clarification on the RAN assistance parameters based on RAN WGs agreements | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143439 | Clarification on the RAN assistance parameters based on RAN WGs agreements | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143440 | Adding abbreviations for 3GPP Radio/WLAN interworking | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143441 | Adding/Fixing the reference on RAN rule based solution | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143442 | Correction to GTP-c overload control in TSCM | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143443 | Correction to TSCM Initial Attach | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143444 | Clarification on equivalent service providers | CR | Nokia Networks, Nokia | S2-105 | - | [WTS] [JSN] | |||
S2-143445 | Clarification on reporting of no congestion state | CR | Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-143446 | Adding interoperabilty aspects between RAN and CN for the CN-based solution | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143447 | Enhancements for the FPI solution | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143448 | [DRAFT] Reply LS on the impacts of packet marking on RAN user plane handling of DL traffic | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143449 | Update to Key issue - 'Group-specific NAS Level Congestion Control' | other | DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143450 | Correction to handover procedures between non-3GPP and 3GPP access when GTP based S2a/S2b is used |
CR revised to S2-143830 |
Cisco, T-Mobile USA | S2-105 | - | [WTS] [JSN] | |||
S2-143451 | Clarification to non-3GPP access to 3GPP access handover procedure | CR | Cisco, T-Mobile USA | S2-105 | - | [WTS] [JSN] | |||
S2-143452 | Clarification to non-3GPP access to 3GPP access handover procedure | CR | Cisco, T-Mobile USA | S2-105 | - | [WTS] [JSN] | |||
S2-143453 | LS to CT WG1 on APN usage in ANDSF | other | Motorola Mobility | S2-105 | - | [WTS] [JSN] | |||
S2-143454 | Correction of references for SWu tunnel establishment | CR | Nokia Networks, Nokia Corporation | S2-105 | - | [WTS] [JSN] | |||
S2-143455 | Solutions on Message delivery to a group of devices | other | Huawei, HiSilicon, KPN | S2-105 | - | [WTS] [JSN] | |||
S2-143456 | PDN-connection based solution for delivery of message destined for a group | other | Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-143457 | T4 message delivery to a group of devices | other | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143458 | Update to Key issue - 'Group-specific NAS Level Congestion Control' | other | DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143459 | TR skeleton for FS_HLcom Optimizations to Support High Latency Communications | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143460 | Scope for the HLcom TR | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143461 | Scenario for DL packet transmission to UE applying sleep function | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143462 | Scenario for Enabler for coordinated DL transmission | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143463 | CS security key derivation for eCSFB | other | Ericsson, Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143464 | eCSFB with IMS#1 | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143465 | eCSFB with IMS#2 | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143466 | UE aspects of SRVCC based CSFB | other | Qualcomm Incorporated, Huawei, HiSilicon, China Unicom | S2-105 | - | [WTS] [JSN] | |||
S2-143467 | Uncertainly with solution 1 regarding TI value and TI flag setting | other | Samsung, Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143468 | Clarifying details of deferred services | CR | Cisco, Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143469 | Np mobility handling | CR | Ericsson, Cisco, Allot Communications, AT&T | S2-105 | - | [WTS] [JSN] | |||
S2-143470 | Transfer of location information on Np | CR | Cisco, Allot Communications, Orange, China Telecom, AT&T, KDDI, Sandvine Incorporated, Broadcom Corporation, Openet, Oracle, ZTE, Comverse, Hitachi, IAESI, Movik Networks, Intel, China Mobile | S2-105 | - | [WTS] [JSN] | |||
S2-143471 | Nq' interface support for Gn/Gp-SGSN | CR | China Mobile, Huawei, China Unicom, ZTE, Vodafone, TeliaSonera, Deutsche Telekom, CATT, Intel, CATR | S2-105 | - | [WTS] [JSN] | |||
S2-143472 | Adding interoperabilty aspects between RAN and CN for the CN-based solution | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143473 | Introduction of RSSI into ANDSF | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Interdigital Communications, Qualcomm Incorporated, Intel, Broadcom Corporation, Huawei, HiSilicon, Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143474 | Clarification of WLAN offload indication from MME in E-UTRAN | CR | Huawei, HiSilicon, CATT, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143475 | Clarification on equivalent service providers | CR | Nokia Networks, Nokia | S2-105 | - | [WTS] [JSN] | |||
S2-143476 | Identification and Discovery of Service Capabilities | other | ZTE, NTTDoCoMo | S2-105 | - | [WTS] [JSN] | |||
S2-143477 | Exposure architecture | other | Ericsson, Alcatel-Lucent, Intel, Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-143478 | Exposure of Multimedia Call Control Capabilities | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143479 | Requirements for interaction of Trusted applications with SCEF | other | Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-143480 | Evaluation on Solution 1 AESE Architecture | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143481 | Setting up data sessions with specified QoS and Priority | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143482 | Changing chargeable party | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143483 | NBIFOM solution for operation mode negotiation | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143484 | Update of Solution based on Implicitly-Triggered IP Flow Mobility | other | Motorola Mobility | S2-105 | - | [WTS] [JSN] | |||
S2-143485 | Coexistence of UE initiated and network initiated | other | Motorola Mobility | S2-105 | - | [WTS] [JSN] | |||
S2-143486 | Routing Rule Negotiation | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143487 | Routing Rule cosideration revision | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143488 | Merged Annex-X Proposal for NBIFOM | other | Oracle, ZTE, Broadcom Corp., CATT, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143489 | Updated Key-issues and Evaluation section based on new SA WG1 SEES requirements | other | Cisco Systems Inc. | S2-105 | - | [WTS] [JSN] | |||
S2-143490 | [DRAFT] Clarification of Monitoring Requirements | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143491 | Event notifications using PCC solution for MONTE | other | Ericsson, Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143492 | Update to solution#3 | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143493 | Communication failure and abnormal communication | other | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143494 | Interim Conclusions for MONTE | other | Cisco Systems Inc., Intel, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143495 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143496 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143497 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143498 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143499 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143500 | Correct Reference to 3GPP2 X.S0057 | CR | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143501 | Interface between IM-SSF and HSS | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143502 | Interface between IM-SSF and HSS | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143503 | Interface between IM-SSF and HSS | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143504 | Interface between IM-SSF and HSS | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143505 | Support for flexible BFCP | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143506 | Support for flexible BFCP | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143507 | Paging policy differentiation for IMS voice | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon | S2-105 | - | [WTS] [JSN] | |||
S2-143508 | Access policy information over Gx | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom Corporation | S2-105 | - | [WTS] [JSN] | |||
S2-143509 | Key issue: Co-ordination between the UE and the network to take into account radio conditions (quality and/or load) | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143510 | CSPS Coordination General Description | CR | Ericsson, TeliaSonera | S2-105 | - | [WTS] [JSN] | |||
S2-143511 | Example signalling flows | CR | Ericsson, Telia Sonera | S2-105 | - | [WTS] [JSN] | |||
S2-143512 | Example logics for CSPS Coordination | CR | Ericsson, Telia Sonera | S2-105 | - | [WTS] [JSN] | |||
S2-143513 | Functional Description | CR | Ericsson, Telia Sonera | S2-105 | - | [WTS] [JSN] | |||
S2-143514 | Correction of the CN assisted eNodeB parameter tuning | CR | Ericsson, ZTE, NEC, Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143515 | Correction of the CN assisted eNodeB parameter tuning | CR | Ericsson, ZTE, NEC, Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143516 | Clarification on how to get LCS accurate cell identity | CR | China Mobile, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143517 | Clarification on how to get LCS accurate cell identity | CR | China Mobile, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143518 | E-UTRAN initiated E-RAB modification procedure update | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143519 | Architectural Requirements | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143520 | Solution 1: SIP-MESSAGE-based SRVCC Enhancement for Transcoding avoidance | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143521 | Solution for SETA | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143522 | Proposal for SRVCC transcodingless operation | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143523 | Adding re-negotiation method for TrFO after SRVCC | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143524 | Configuration for paging policy differentiation | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon | S2-105 | - | [WTS] [JSN] | |||
S2-143525 | Merged Annex-X Proposal for NBIFOM | other | Oracle, ZTE, Broadcom Corp., CATT, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143526 | Updated WID for Flexible Mobile Service Steering (FMSS) | other | China Mobile, Alcatel-Lucent, Alcatel-Lucent ShangHai Bell, China Telecom, Orange, China Unicom | S2-105 | - | [WTS] [JSN] | |||
S2-143527 | New Work Item Description on Services Domain Centralization | other | Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143528 | New Study Item on Coordinated P-GW Change for SIPTO (FS_CSIPTO) | other | Samsung, Intel, China Mobile, China Unicom, China Telecom, China Academy of Telecommunications Technology, Orange, Sprint, Sony Mobile Communication, InterDigital, ACER, NEC, LG. | S2-105 | - | [WTS] [JSN] | |||
S2-143529 | Support for ProSe for UE in limited service state | CR | Qualcomm Incorporated, UK Home Office, US Department of Commerce | S2-105 | - | [WTS] [JSN] | |||
S2-143530 | [DRAFT] Reply LS on availability of ProSe Direct Communication in limited service state | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143531 | RAN WG2 alignments for ProSe Multi-Carrier support | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143532 | Per country radio resource configuration for Public Safety UEs | CR | Qualcomm Incorporated, UK Home Office, Alcatel-Lucent, US Department of Commerce | S2-105 | - | [WTS] [JSN] | |||
S2-143533 | High Level MCPTT Architecture | other | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143534 | IMS based MCPTT Architecture Proposal | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143535 | Architecture overview | other | AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143536 | Charging correlation identifier for the IP-CAN session | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143537 | Charging correlation identifier for the IP-CAN session | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143538 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143539 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143540 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143541 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143542 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143543 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143544 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143545 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143546 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, NSN, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143547 | Reserved for Erik's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143548 | [DRAFT] Response LS on eMBMS broadcast areas with EUTRAN Cell Granularity | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143549 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143550 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143551 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143552 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143553 | [DRAFT] Clarification of GCS AS use of MBMS Delivery Methods | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143554 | Correction to Delay Budget for first packets in a data burst | CR | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143555 | Correction to Delay Budget for first packets in a data burst | CR | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143556 | [DRAFT] Reply LS on Group Call eMBMS congestion management for LTE | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143557 | Long Group Calls and New Cells | CR | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143558 | Reserved for Erik's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143559 | Reserved for Erik's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143560 | Reserved for Erik's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143561 | UPCON Drafting session report | other | Drafting convenor (Allot Communications) | S2-105 | - | [WTS] [JSN] | |||
S2-143562 | Np mobility handling | CR | Ericsson, Cisco, Allot Communications, AT&T | S2-105 | - | [WTS] [JSN] | |||
S2-143563 | Transfer of location information on Np | CR | Cisco, Allot Communications, Orange, China Telecom, AT&T, KDDI, Sandvine Incorporated, Broadcom Corporation, Openet, Oracle, ZTE, Comverse, Hitachi, IAESI, Movik Networks, Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143564 | Nq' interface support for Gn/Gp-SGSN | CR | China Mobile, Huawei, China Unicom, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143565 | Reserved for parallel sessions (Alla Goldner) | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143566 | Update of WID for Isolated E-UTRAN Operation for Public Safety | other | General Dynamics UK Ltd | S2-105 | - | [WTS] [JSN] | |||
S2-143567 | Extended DRX cycle for Power Consumption Optimization | other | Qualcomm Incorporated, Ericsson, ZTE, Sierra Wireless, Verizon, AT&T, China Unicom | S2-105 | - | [WTS] [JSN] | |||
S2-143568 | New WID on MBMS Enhancements | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143569 | Solution for Public Safety Discovery | other | Intel, Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143570 | Identifiers for ProSe Restricted Discovery | other | Qualcomm Incorporated, Huawei, Hisilicon, Telecom Italia, Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143571 | Restricted ProSe Direct Discovery procedures | other | Telecom Italia, Qualcomm Incorporated, Huawei, Hisilicon, Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143572 | Solution for ProSe UE-Network and ProSe UE-UE Relays | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143573 | Handling of E-UTRAN Inter RAT Handover information in Gb mode | CR | Ericsson, Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143574 | Handling of E-UTRAN Inter RAT Handover information in Gb mode | CR | Ericsson, Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143575 | Handling of E-UTRAN Inter RAT Handover information in Gb mode | CR | Ericsson, Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143576 | Pending Subscription Change | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143577 | Pending Subscription Change | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143578 | Correction of 'extended wait timers' in RRC signalling | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143579 | Correction of 'extended wait timers' in RRC signalling | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143580 | Correction of 'extended wait timers' in RRC signalling | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143581 | Correction of 'extended wait timers' in RRC signalling | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143582 | EAB initiation in BSC | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143583 | EAB initiation in BSC | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143584 | EAB initiation in BSC | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143585 | EAB initiation in BSC | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143586 | [DRAFT] LS on EAB initiation in BSC | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143587 | Solution for One-to-One Communication | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143588 | [DRAFT] Reply LS on assumptions for out of network coverage discovery | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143589 | Solution for ProSe UE-Network and ProSe UE-UE Relays | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143590 | Identifiers for ProSe Restricted Discovery | other | Qualcomm Incorporated, Huawei, Hisilicon, Telecom Italia, Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143591 | Restricted ProSe Direct Discovery procedures | other | Telecom Italia, Qualcomm Incorporated, Huawei, Hisilicon, Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143592 | Updates to Solution 1 and Solution 2 for initial MME/SGSN assignment at TAU and HO | other | NTT DOCOMO, Ericsson, NEC, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143593 | Roaming models | other | AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143594 | System-, application- and IMS-level considerations for Network Mode Operation via Relay (NMO-R) | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143595 | Requiring to always have TFT in Secondary PDP context for E-UTRAN capable device | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143596 | Requiring to always have TFT in Secondary PDP context for E-UTRAN capable device | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143597 | Requiring to always have TFT in Secondary PDP context for E-UTRAN capable device | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143598 | NBIFOM solution for operation mode negotiation | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143599 | Update of Solution based on Implicitly-Triggered IP Flow Mobility | other | Motorola Mobility | S2-105 | - | [WTS] [JSN] | |||
S2-143600 | Routing Rule Negotiation | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143601 | Event notifications using PCC solution for MONTE | other | Ericsson, Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143602 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143603 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143604 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143605 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143606 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143607 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143608 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143609 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143610 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143611 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143612 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143613 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143614 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143615 | Considerations on solution 1 supporting class of users | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143616 | Solution 2 - Single HSS Subscription (Architecture, Procedures and Call flows) | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143617 | Solution for WebRTC support of IMS subscriptions corresponding to users managed by third parties | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143618 | Adding new architecture to support 'user managed by 3rd party' | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143619 | Flows for support an unbounded number of users | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143620 | Update of section 5 solution 1: (Single HSS subscription for an unbounded number of users) Flow for a re-registration and for an incoming session | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143621 | Considerations on solution 1 supporting class of users | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143622 | Introducing the feature of excluding Usage of a Service/Application from IP-CAN session/TDF session Usage into the specification | CR | China Telecom, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent ShangHai Bell, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143623 | [DRAFT] LS on Introducing the feature of excluding Usage of a Service/Application from IP-CAN session/TDF session Usage into the specification | other | Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143624 | New Annex: Monitor service usage in multiple groups | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143625 | Issue with handover failure in Solution #1 | other | Nokia Networks, Nokia Corp, Samsung, Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143626 | Decomposed Architecture for The Enterprise PBX Scenario | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143627 | Update of section 6 solution 1: (WTPF) | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143628 | eWebRTCi Flexible Service Control | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143629 | E2E Media Transport | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143630 | P-CSCF Information Reporting Shared resources | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143631 | LS to CT WG1 on Rx resource sharing information | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143632 | Indication to share resources in the UL or DL or both directions | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143633 | Np mobility handling | CR | Ericsson, Cisco, Allot Communications, AT&T | S2-105 | - | [WTS] [JSN] | |||
S2-143634 | Adding interoperabilty aspects between RAN and CN for the CN-based solution | CR | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143635 | The DECOR subscription information | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143636 | Support of inter-PLMN mobility and heterogeneous deployment of dedicated network | other | NTT DOCOMO, TeliaSonera, Vodafone? | S2-105 | - | [WTS] [JSN] | |||
S2-143637 | Clarification of DNS Requirements for DCOR | other | NTT DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143638 | Clarification of PGW and SGW Selection | other | NTT DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143639 | Solution X: MME triggered S1 handover | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143640 | MME triggered re-direction to dedicated MME | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143641 | Solution for Public Safety Discovery | other | Intel, Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143642 | Solution for Public Safety Discovery | other | Intel, Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143643 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143644 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143645 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143646 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143647 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143648 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143649 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143650 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143651 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143652 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143653 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143654 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143655 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143656 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143657 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143658 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143659 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143660 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143661 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143662 | Reserved for Frank's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143663 | Cell ID announcement in ProSe UE-to-Network relays |
other revised to S2-144110 |
Alcatel-lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143664 | Target UE Restricted ProSe Direct Discovery | other | Huawei, Hisilicon, Telecom Italia, Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143665 | Procedures for Model B Restricted Discovery (non-public safety) | other | InterDigital Communications | S2-105 | - | [WTS] [JSN] | |||
S2-143666 | Discovery Filters & discovery permissions changes | other | Telecom Italia | S2-105 | - | [WTS] [JSN] | |||
S2-143667 | ProSe Authorization revisited | CR | Ericsson, Qualcomm Incorporated, Telecom Italia, LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143668 | Correction to the Low Access Priority Indication use by the network. | CR | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143669 | Correction to the Low Access Priority Indication use by the network. | CR | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143670 | Correction to the Low Access Priority Indication use by the network. | CR | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143671 | Correction to the Low Access Priority Indication use by the network. | CR | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143672 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143673 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143674 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143675 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143676 | Handling CS Service Notification received during handover | CR | Nokia Networks, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143677 | Enable ISR for PS-only UE | CR | CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143678 | Enable ISR for PS-only UE | CR | CATT | S2-105 | - | [WTS] [JSN] | |||
S2-143679 | Paging enhancements for Low Complexity UE | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143680 | Paging enhancements for Low Complexity UE | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143681 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143682 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143683 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143684 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143685 | Update of null-NRI/null-MMEGI based redirection during Attach | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143686 | Updates to Solution 1 and Solution 2 for initial MME/SGSN assignment at TAU and HO | other | NTT DOCOMO, Ericsson, NEC, Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143687 | Null-NRI based redirect for 2G and 3G Attach | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143688 | Updates to Solution 1 and Solution 2 for HSS Initiated CN Type Change | other | NTT DOCOMO, Ericsson? | S2-105 | - | [WTS] [JSN] | |||
S2-143689 | MMEGI/NRI for dedicated networks re-selection | other | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143690 | Additional GUTI for the dedicated MME | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143691 | Enhancements for the FPI solution | other | Huawei, Hisilicon, Orange, China Mobile, AT&T, Telecom Italia, Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143692 | Introducing the feature of excluding Usage of a Service/Application from IP-CAN session/TDF session Usage into the specification | CR | China Telecom, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent ShangHai Bell, ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143693 | [DRAFT] LS on Introducing the feature of excluding Usage of a Service/Application from IP-CAN session/TDF session Usage into the specification | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143694 | Adding/Fixing the reference on RAN rule based solution | CR | LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143695 | [DRAFT] LS on Overload control for Transparent Single-Connection mode | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143696 | Clarification to non-3GPP access to 3GPP access handover procedure | CR | Cisco, T-Mobile USA, Nokia Networks, Nokia Corporation | S2-105 | - | [WTS] [JSN] | |||
S2-143697 | Clarification to non-3GPP access to 3GPP access handover procedure | CR | Cisco, T-Mobile USA, Nokia Networks, Nokia Corporation | S2-105 | - | [WTS] [JSN] | |||
S2-143698 | LS on APN Usage in NSWO Rules | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143699 | Solution 2 - Single HSS Subscription (Architecture, Procedures and Call flows) | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143700 | Adding new architecture to support 'user managed by 3rd party' | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143701 | Update of section 5 solution 1: (Single HSS subscription for an unbounded number of users) Flow for a re-registration and for an incoming session | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143702 | Considerations on solution 1 supporting class of users | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143703 | Update of section 6 solution 1: (WTPF) | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143704 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143705 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143706 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143707 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143708 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143709 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143710 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143711 | ProSe Authorization revisited | CR | Ericsson, Qualcomm Incorporated, Telecom Italia, LG Electronics | S2-105 | - | [WTS] [JSN] | |||
S2-143712 | ProSe Application ID authorization | CR | ZTE, Telecom Italia | S2-105 | - | [WTS] [JSN] | |||
S2-143713 | Assigment of ProSe UE ID for broadcast or when bearer-level security is not used | CR | Intel, Alcatel-Lucent, Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143714 | System-, application- and IMS-level considerations for Network Mode Operation via Relay (NMO-R) | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143715 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143716 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143717 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143718 | Support for IPv6 prefix retrieve by the HSGW during the eHRPD pre-registration procedure | CR | ZTE, China Telecom, Qualcomm | S2-105 | - | [WTS] [JSN] | |||
S2-143719 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, Nokia Networks, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143720 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, Nokia Networks, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143721 | Clarifications for TFT handling | CR | Huawei, Hisilicon, Oracle, Nokia Networks, Openet | S2-105 | - | [WTS] [JSN] | |||
S2-143722 | Clarifications for Multimedia Priority Services | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143723 | Clarifications for Multimedia Priority Services | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143724 | Requiring to always have TFT in Secondary PDP context for E-UTRAN capable device | CR | Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143725 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143726 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143727 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143728 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143729 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143730 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143731 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143732 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143733 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143734 | Reserved for Ivano's parallel sessions | other | - | S2-105 | - | [WTS] [JSN] | |||
S2-143735 | High Level MCPTT Architecture | other | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143736 | Roaming models | other | AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143737 | Clarifications for priority related PCRF actions | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143738 | Clarification of GCS AS use of MBMS Delivery Methods | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143739 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143740 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143741 | QoS handling at inter-RAT mobility | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143742 | Correction to Delay Budget for first packets in a data burst | CR | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143743 | Response LS on Group Call eMBMS congestion management for LTE | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143744 | Additional GUTI for the dedicated MME | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143745 | Solution for Public Safety Discovery | other | Intel, Qualcomm Incorporated | S2-105 | - | [WTS] [JSN] | |||
S2-143746 | Restricted ProSe Direct Discovery procedures | other | Telecom Italia, Qualcomm Incorporated, Huawei, Hisilicon, Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143747 | Long Group Calls and New Cells | CR | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143748 | Extended DRX cycle for Power Consumption Optimization | other | Qualcomm Incorporated, Ericsson, ZTE, Sierra Wireless, Verizon, AT&T, China Unicom | S2-105 | - | [WTS] [JSN] | |||
S2-143749 | Updated WID for Flexible Mobile Service Steering (FMSS) | other | China Mobile, Alcatel-Lucent, Alcatel-Lucent ShangHai Bell, China Telecom, Orange, China Unicom | S2-105 | - | [WTS] [JSN] | |||
S2-143750 | New Work Item Description on Services Domain Centralization | other | Deutsche Telekom | S2-105 | - | [WTS] [JSN] | |||
S2-143751 | Update of WID for Isolated E-UTRAN Operation for Public Safety | other | General Dynamics UK Ltd | S2-105 | - | [WTS] [JSN] | |||
S2-143752 | Feasibility study on Extended DRX cycle for Power Consumption Optimization | other | Qualcomm Incorporated, Ericsson, ZTE, Sierra Wireless, Verizon, AT&T, China Unicom, Interdigital, Alcatel-Lucent, Orange, Sony | S2-105 | - | [WTS] [JSN] | |||
S2-143753 | New WID on MBMS Enhancements | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143754 | Identification and Discovery of Service Capabilities | other | ZTE, NTTDoCoMo | S2-105 | - | [WTS] [JSN] | |||
S2-143755 | Exposure of Multimedia Call Control Capabilities | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143756 | Requirements for interaction of Trusted applications with SCEF | other | Cisco | S2-105 | - | [WTS] [JSN] | |||
S2-143757 | [DRAFT] Clarification of Monitoring Requirements | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143758 | Updated Key-issues and Evaluation section based on new SA WG1 SEES requirements | other | Cisco Systems Inc. | S2-105 | - | [WTS] [JSN] | |||
S2-143759 | Event notifications using PCC solution for MONTE | other | Ericsson, Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143760 | Interim Conclusions for MONTE | other | Cisco Systems Inc., Intel, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143761 | Issue with two simultaneous calls in Solution #1, MO call | other | Nokia Networks, Nokia Corp, Samsung, Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143762 | Update to Key issue - 'Group-specific NAS Level Congestion Control' | other | DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143763 | CSPS Coordination General Description | CR | Ericsson, TeliaSonera | S2-105 | - | [WTS] [JSN] | |||
S2-143764 | Configuration for paging policy differentiation | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | S2-105 | - | [WTS] [JSN] | |||
S2-143765 | Solution 1: SIP-MESSAGE-based SRVCC Enhancement for Transcoding avoidance | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143766 | Proposal for SRVCC transcodingless operation | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143767 | eCSFB with IMS#1 | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143768 | UE aspects of SRVCC based CSFB | other | Qualcomm Incorporated, Huawei, HiSilicon, China Unicom | S2-105 | - | [WTS] [JSN] | |||
S2-143769 | Issue with handover failure in Solution #1 | other | Nokia Networks, Nokia Corp, Samsung, Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143770 | CS security key derivation for eCSFB | other | Ericsson, Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143771 | Solutions on Message delivery to a group of devices | other | Huawei, HiSilicon, KPN | S2-105 | - | [WTS] [JSN] | |||
S2-143772 | T4 message delivery to a group of devices | other | NEC | S2-105 | - | [WTS] [JSN] | |||
S2-143773 | Adding re-negotiation method for TrFO after SRVCC | other | ZTE | S2-105 | - | [WTS] [JSN] | |||
S2-143774 | Update to Key issue - 'Group-specific NAS Level Congestion Control' | other | DOCOMO | S2-105 | - | [WTS] [JSN] | |||
S2-143775 | Scenario for Enabler for coordinated DL transmission | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143776 | Setting up data sessions with specified QoS and Priority | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143777 | Changing chargeable party | other | Huawei, HiSilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143778 | Clarification of Monitoring Requirements | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143779 | Interim Conclusions for MONTE | other | Cisco Systems Inc., Intel, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143780 | RAN WG2 alignments for ProSe Multi-Carrier support | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143781 | Support for ProSe for UE in limited service state | CR | Qualcomm Incorporated, UK Home Office, US Department of Commerce | S2-105 | - | [WTS] [JSN] | |||
S2-143782 | Per country radio resource configuration for Public Safety UEs | CR | Qualcomm Incorporated, UK Home Office, Alcatel-Lucent, US Department of Commerce | S2-105 | - | [WTS] [JSN] | |||
S2-143783 | Solution for ProSe UE-Network and ProSe UE-UE Relays | other | Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143784 | Feasibility study on Extended DRX cycle for Power Consumption Optimization | other | Qualcomm Incorporated, Ericsson, ZTE, Sierra Wireless, Verizon, AT&T, China Unicom, Interdigital, Alcatel-Lucent, Orange, Sony | S2-105 | - | [WTS] [JSN] | |||
S2-143785 | New WID on MBMS Enhancements | other | Nokia Networks | S2-105 | - | [WTS] [JSN] | |||
S2-143786 | Solution 2 - Single HSS Subscription (Architecture, Procedures and Call flows) | other | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143787 | Decomposed Architecture for The Enterprise PBX Scenario | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143788 | E2E Media Transport | other | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] | |||
S2-143789 | Access policy information over Gx | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom Corporation | S2-105 | - | [WTS] [JSN] | |||
S2-143790 | Merged Annex-X Proposal for NBIFOM | other | Oracle, ZTE, Broadcom Corp., CATT, Huawei | S2-105 | - | [WTS] [JSN] | |||
S2-143791 | NBIFOM solution for operation mode negotiation | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143792 | Enhancements for the FPI solution | other | Huawei, Hisilicon, Orange, China Mobile, AT&T, Telecom Italia, Alcatel-Lucent | S2-105 | - | [WTS] [JSN] | |||
S2-143793 | Introducing the feature of excluding Usage of a Service/Application from IP-CAN session/TDF session Usage into the specification | CR | China Telecom, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, KDDI, Allot Communications | S2-105 | - | [WTS] [JSN] | |||
S2-143794 | LS on Introducing the feature of excluding Usage of a Service/Application from IP-CAN session/TDF session Usage into the specification | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143795 | Reply LS on assumptions for out of network coverage discovery | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143796 | Paging enhancements for Low Complexity UE | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143797 | Paging enhancements for Low Complexity UE | CR | Ericsson | S2-105 | - | [WTS] [JSN] | |||
S2-143798 | Response LS on eMBMS broadcast areas with EUTRAN Cell Granularity | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143799 | Additional GUTI for the dedicated MME | other | Samsung | S2-105 | - | [WTS] [JSN] | |||
S2-143800 | EAB initiation in BSC | CR | Orange | S2-105 | - | [WTS] [JSN] | |||
S2-143801 | LS on EAB initiation in BSC | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143802 | Access policy information over Gx | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom Corporation | S2-105 | - | [WTS] [JSN] | |||
S2-143803 | [DRAFT] LS on Overload control for Transparent Single-Connection mode | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143804 | LS to CT WG1 on Rx resource sharing information | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143805 | CS security key derivation for eCSFB | other | Ericsson, Intel | S2-105 | - | [WTS] [JSN] | |||
S2-143806 | High Level MCPTT Architecture | other | Vodafone | S2-105 | - | [WTS] [JSN] | |||
S2-143807 | Roaming models | other | AIRBUS | S2-105 | - | [WTS] [JSN] | |||
S2-143808 | Response LS on Overload control for Transparent Single-Connection mode | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143809 | LS on Introducing the feature of excluding Usage of a Service/Application from IP-CAN session/TDF session Usage into the specification | other | SA WG2 | S2-105 | - | [WTS] [JSN] | |||
S2-143810 | E-UTRAN initiated E-RAB modification procedure update | CR | Huawei, Hisilicon | S2-105 | - | [WTS] [JSN] |
867 documents (1.0770659446716 seconds)