Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S1-214000 | Draft agenda for SA1#94e | agenda | Chair |
S1-96-e AI: 2 |
revised | [WTS] [JSN] | |||
S1-214001 | 2nd Draft agenda for SA1#96e | agenda | Chair |
S1-96-e AI: 2 |
approved | [WTS] [JSN] | |||
S1-214002 | Agenda for SA1#96e with tdoc allocation | agenda | Chair |
S1-96-e AI: 2 |
withdrawn | [WTS] [JSN] | |||
S1-214003 | SA1-related topics at SA#93e |
report revised to S1-214199 |
Chair |
S1-96-e AI: 2 |
revised | [WTS] [JSN] | |||
S1-214004 | Draft minutes of SA1#95e | report | ETSI MCC |
S1-96-e AI: 2 |
revised | [WTS] [JSN] | |||
S1-214005 | Minutes of SA1#95e | report | ETSI MCC |
S1-96-e AI: 2 |
approved | [WTS] [JSN] | |||
S1-214006 | Guidelines for SA1#96e (e-meeting) | other | SA1 Chair, MCC |
S1-96-e AI: 2 |
noted | [WTS] [JSN] | |||
S1-214007 | Work Plan presentation for SA1#96e | Work Plan | ETSI MCC |
S1-96-e AI: 2 |
noted | [WTS] [JSN] | |||
S1-214008 | MCC info on CR Rules | other | ETSI MCC |
S1-96-e AI: 2 |
noted | [WTS] [JSN] | |||
S1-214009 | 3GPP Voting Tool User guide | other | ETSI MCC |
S1-96-e AI: 2 |
noted | [WTS] [JSN] | |||
S1-214010 | Get the missing figure A.1-1 back |
CR revised to S1-214305 |
China Telecommunications | 22.867 18.1.0 CR#17 catD | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214011 | Removal of all existing Editor’s Notes in TR 22.867 |
CR revised to S1-214306 |
China Telecommunications | 22.867 18.1.0 CR#18 catD | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214012 | Verification of KPIs for the use case in clause 5.5 |
CR revised to S1-214293 |
InterDigital | 22.847 18.0.0 CR#1 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214013 | CR to TS22104 correction of reference for clause 5.6.1 |
CR revised to S1-214272 |
Huawei Technologies France | 22.104 18.2.0 CR#89 catC | SEI | Rel-18 |
S1-96-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-214014 | CR to T22.867 v18.1.0 clause 5.13 correction of reference for clause 5.6.1 |
CR revised to S1-214307 |
Huawei Technologies France | 22.867 18.1.0 CR#19 catC | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214015 | Editorial correction TS22125 |
CR revised to S1-214309 |
Huawei Technologies France | 22.125 17.4.0 CR#38 catD | ID_UAS | Rel-17 |
S1-96-e AI: 5 |
revised | [WTS] [JSN] |
S1-214016 | CR to 22.125 inclusive language |
CR revised to S1-214253 |
Huawei Technologies France | 22.125 17.4.0 CR#39 catD | ID_UAS | Rel-17 |
S1-96-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-214017 | CR to 22.125 correction and readability improvement |
CR revised to S1-214254 |
Huawei Technologies France | 22.125 17.4.0 CR#40 catC | ID_UAS | Rel-17 |
S1-96-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-214018 | Filling all CPRs into a normalized table |
CR revised to S1-214302 |
China Telecommunications | 22.867 18.1.0 CR#20 catD | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214019 | Table linking CPRs to their PRs and use cases | CR | BDBOS | 22.881 18.0.1 CR#1 catD | FS_SACI_MCS | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214020 | Editorial corrections to clause 6.23.2 (QoS monitoring) | CR | Huawei Technologies Sweden AB | 22.261 16.15.0 CR#580 catD | QoS_MON | Rel-16 |
S1-96-e AI: 5 |
agreed | [WTS] [JSN] |
S1-214021 | Editorial corrections to clause 6.23.2 (QoS monitoring) | CR | Huawei Technologies Sweden AB | 22.261 17.8.0 CR#581 catA | QoS_MON | Rel-17 |
S1-96-e AI: 5 |
agreed | [WTS] [JSN] |
S1-214022 | Editorial corrections to clause 6.23.2 (QoS monitoring) | CR | Huawei Technologies Sweden AB | 22.261 18.4.0 CR#582 catA | QoS_MON | Rel-18 |
S1-96-e AI: 5 |
agreed | [WTS] [JSN] |
S1-214023 | 3GPP SA1 clarifications on problematic UAV | discussion | Huawei Technologies Sweden AB |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214024 | Addition of a note to [R-5.1-017] related to the applicability of the requirement |
CR revised to S1-214239 |
Huawei Technologies Sweden AB | 22.125 17.4.0 CR#41 catC | ID_UAS | Rel-17 |
S1-96-e AI: 3 |
revised | [WTS] [JSN] |
S1-214025 | Reply LS to GSMA-ACJA, SA2, SA6 (cc SA3) on clarifications on problematic UAV |
LS out LS To: GSMA-ACJA, SA2, SA6 (cc SA3) revised to S1-214238 |
Huawei Technologies Sweden AB |
S1-96-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-214026 | proposed 9.2 guidelines | pCR | THALES, TNO, Samsung | 22.926 1.0.0 | FS_5GET | Rel-18 |
S1-96-e AI: 7.4.1 |
withdrawn | [WTS] [JSN] |
S1-214027 | Triggering a change of communication privileges for a particular FRMCS User based on identities and/or talker status |
CR revised to S1-214287 |
Union Inter. Chemins de Fer | 22.989 18.2.0 CR#8 catC | FS_eFRMCS | Rel-18 |
S1-96-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-214028 | Arbitration: automatic answer | CR | Union Inter. Chemins de Fer | 22.989 18.2.0 CR#9 catC | FS_eFRMCS | Rel-18 |
S1-96-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-214029 | Alignment between Changing conditions of Railway Emergency Alert and Merging Railway Emergency Alert |
CR revised to S1-214288 |
Union Inter. Chemins de Fer | 22.989 18.2.0 CR#10 catC | FS_eFRMCS | Rel-18 |
S1-96-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-214030 | Service interworking between FRMCS and GSM-R of presence is no more required | CR | Union Inter. Chemins de Fer | 22.989 18.2.0 CR#11 catC | FS_eFRMCS | Rel-18 |
S1-96-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-214031 | Global clean up to remove unnecessary clauses | pCR | Union Inter. Chemins de Fer | 22.99 1.0.0 | FS_OffNetRail | Rel-18 |
S1-96-e AI: 7.5.1 |
agreed | [WTS] [JSN] |
S1-214032 | Clean up of references | pCR | Union Inter. Chemins de Fer | 22.99 1.0.0 | FS_OffNetRail | Rel-18 |
S1-96-e AI: 7.5.1 |
agreed | [WTS] [JSN] |
S1-214033 | Use of inclusive language to align with SA2 and CT4 | CR | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | 22.016 16.0.0 CR#14 catD | TEI17 | Rel-17 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214034 | Addition of PALs requirement for manual selection |
CR revised to S1-214205 |
vivo | 22.011 18.0.0 CR#325 catB | PALS | Rel-18 |
S1-96-e AI: 7.8.1 |
revised | [WTS] [JSN] |
S1-214035 | New SID on Additional capabilities of mobile networks for drone (FS_DOM) |
SID new revision of S1-213088 |
China Mobile |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214036 | New SID on Integrated Sensing and Communication | SID new | China Mobile Com. Corporation |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214037 | CR22.874 FS_AMMT update to CPR tables with new format |
CR revised to S1-214301 |
OPPO | 22.874 18.1.0 CR#3 catD | FS_AMMT | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214038 | Discussion on Enhanced 5G functionalities for application AI/ML services | discussion | OPPO |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214039 | New WID on study on Enhanced 5G functionalities for application AI/ML services | SID new | OPPO |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214040 | Correction of network condition change per UE |
CR revised to S1-214266 |
InterDigital | 22.261 18.4.0 CR#583 catF | AMMT | Rel-18 |
S1-96-e AI: 7.3.1 |
revised | [WTS] [JSN] |
S1-214041 | FS_TACMM multi-modality vs. multi-modal | discussion | Huawei Technologies R&D UK |
S1-96-e AI: 7.11.1 |
noted | [WTS] [JSN] | |||
S1-214042 | Align the use of multi-modal | CR | Huawei Technologies R&D UK | 22.847 18.0.0 CR#2 catD | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214043 | Resident consolidated requirements table update | CR | KPN | 22.858 18.1.0 CR#27 catD | FS_Resident | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214044 | LS on on the scope of applying Network Slicing feature in Rel-17 and Rel-16 | LS out | Nokia, Nokia Shanghai Bell |
S1-96-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-214045 | Clarification of NPN in 22.261 |
CR revised to S1-214235 |
Nokia, Nokia Shanghai Bell, Phillips International B.V. | 22.261 16.15.0 CR#584 catF | TEI16, eCAV | Rel-16 |
S1-96-e AI: 3 |
revised | [WTS] [JSN] |
S1-214046 | Clarification of NPN in 22.261 |
CR revised to S1-214236 |
Nokia, Nokia Shanghai Bell, Phillips International B.V. | 22.261 17.8.0 CR#585 catA | TEI16, eCAV | Rel-17 |
S1-96-e AI: 3 |
revised | [WTS] [JSN] |
S1-214047 | Discussion on CT1 LS: Indication of country of UE location and its use in PLMN selection | discussion | Nokia, Nokia Shanghai Bell |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214048 | Reply LS on Indication of country of UE location and its use in PLMN selection | LS out | Nokia, Nokia Shanghai Bell |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214049 | Reply to LS to SA3 (cc SA2, CT1, RAN2, RAN3, SA, CT, RAN) on support of PWS over SNPN |
LS out LS To: SA3 (cc SA2, CT1, RAN2, RAN3, SA, CT, RAN) |
Nokia, Nokia Shanghai Bell |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-214050 | Clarification of NPN in 22.261 |
CR revised to S1-214255 |
Nokia, Nokia Shanghai Bell, Phillips International B.V. | 22.261 17.8.0 CR#586 catF | TEI17, AVPROD | Rel-17 |
S1-96-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-214051 | Clarification of NPN in 22.261 |
CR revised to S1-214256 |
Nokia, Nokia Shanghai Bell, Phillips International B.V. | 22.261 18.4.0 CR#587 catA | TEI17, AVPROD | Rel-18 |
S1-96-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-214052 | Change to Annex D on use of IMC |
CR revised to S1-214257 |
Nokia, Nokia Shanghai Bell | 22.228 17.0.0 CR#234 catF | TEI17 | Rel-17 |
S1-96-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-214053 | Update CPR tables | CR | Nokia, Nokia Shanghai Bell | 22.878 18.1.0 CR#3 catD | FS_5TRS | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214054 | Proposed 9.2 Guidelines for handling extra-territoriality in the 3GPP system |
pCR revised to S1-214271 |
THALES, TNO, Samsung | 22.926 1.0.0 | FS_5GET | Rel-18 |
S1-96-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-214055 | Adding Informative Annex for PALS | CR | Qualcomm Austria RFFE GmbH | 22.261 18.4.0 CR#588 catF | PALS | Rel-18 |
S1-96-e AI: 7.8.1 |
agreed | [WTS] [JSN] |
S1-214056 | Cooperative Communication and Sensing | discussion | Qualcomm Austria RFFE GmbH |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214057 | CPR# to PR# Mapping for PALS |
CR revised to S1-214304 |
Qualcomm Austria RFFE GmbH | 22.844 18.1.0 CR#9 catF | FS_PALS | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214058 | Update to Smart Grid Normative Requirements |
CR revised to S1-214211 |
Qualcomm Austria RFFE GmbH | 22.261 18.4.0 CR#589 catF | SEI | Rel-18 |
S1-96-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-214059 | Update of the KPI table in clause 5.4 |
CR revised to S1-214292 |
LG Electronics Inc. | 22.847 18.0.0 CR#3 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214060 | EASNS CPR mapping to PR(s) | CR | LG Electronics Inc. | 22.835 18.1.0 CR#5 catD | FS_EASNS | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214061 | SID on Study on 5G System Support for a Network of Service Robots with Ambient Intelligence | SID new | LG Electronics Inc. |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214062 | 5G System Support for Service-Oriented Robots with Human Interactions | discussion | LG Electronics Inc. |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214063 | Reply LS on problematic UAVs | LS out | Qualcomm Incorporated |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214064 | CR on problematic UAVs | CR | Qualcomm Incorporated | 22.125 17.4.0 CR#42 catF | ID_UAS | Rel-17 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] |
S1-214065 | Alignment with new added smart grid |
CR revised to S1-214274 |
ZTE Corporation | 22.261 18.4.0 CR#590 catD | SEI | Rel-18 |
S1-96-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-214066 | Reply LS to CT1 (cc CT6) on UE PWS parameters storage for SNPN |
LS out LS To: CT1 (cc CT6) |
Qualcomm Incorporated |
S1-96-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-214067 | Clarification on SNPN UEs without USIM |
CR revised to S1-214262 |
Qualcomm Incorporated | 22.261 16.15.0 CR#591 catF | TEI16 | Rel-16 |
S1-96-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-214068 | Remove editor note for Figure A.4.4.3-1 | CR | ZTE Corporation | 22.104 18.2.0 CR#90 catD | SEI | Rel-18 |
S1-96-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-214069 | Clarification on SNPN UEs without USIM |
CR revised to S1-214263 |
Qualcomm Incorporated | 22.261 17.8.0 CR#592 catA | TEI17 | Rel-17 |
S1-96-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-214070 | Clarification on SNPN UEs without USIM |
CR revised to S1-214264 |
Qualcomm Incorporated | 22.261 18.4.0 CR#593 catA | TEI18 | Rel-18 |
S1-96-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-214071 | CR on VR sync requirements |
CR revised to S1-214265 |
Qualcomm Incorporated | 22.261 16.15.0 CR#594 catF | TEI16 | Rel-16 |
S1-96-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-214072 | CR on VR sync requirements | CR | Qualcomm Incorporated | 22.261 17.8.0 CR#595 catA | TEI17 | Rel-17 |
S1-96-e AI: 6.2 |
noted | [WTS] [JSN] |
S1-214073 | CR on VR sync requirements | CR | Qualcomm Incorporated | 22.261 18.4.0 CR#596 catA | TEI18 | Rel-18 |
S1-96-e AI: 6.2 |
noted | [WTS] [JSN] |
S1-214074 | Periodic network selection with shared MCC |
CR revised to S1-214209 |
KPN, TNO | 22.011 17.4.0 CR#326 catF | 5GSAT | Rel-17 |
S1-96-e AI: 3 |
revised | [WTS] [JSN] |
S1-214075 | New study on network sharing in 5GS | SID new | China Unicom |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214076 | Disscussion paper of network sharing in 5G | discussion | China Unicom |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214077 | CR22.261v18.4.0 Update to charging requirements for AMMT | CR | OPPO | 22.874 18.1.0 CR#4 catB | AMMT | Rel-18 |
S1-96-e AI: 7.3.1 |
revised | [WTS] [JSN] |
S1-214078 | CR22.115v18.0.0 Update to charging requirements for AMMT | CR | OPPO | 22.115 18.0.0 CR#106 catB | AMMT | Rel-18 |
S1-96-e AI: 7.3.1 |
noted | [WTS] [JSN] |
S1-214079 | FS_AMMT TR22.874 Update to charging requirements | CR | OPPO | 22.874 18.1.0 CR#5 catF | AMMT | Rel-18 |
S1-96-e AI: 7.12 |
merged | [WTS] [JSN] |
S1-214080 | CR22.261v18.4.0 Adding requirement of FL for AMMT |
CR revised to S1-214268 |
OPPO | 22.261 18.4.0 CR#597 catB | AMMT | Rel-18 |
S1-96-e AI: 7.3.1 |
revised | [WTS] [JSN] |
S1-214081 | FS_AMMT update to requirements of FL for AMMT | CR | OPPO | 22.874 18.1.0 CR#6 catF | AMMT | Rel-18 |
S1-96-e AI: 7.12 |
merged | [WTS] [JSN] |
S1-214082 | Requirements consolidated on tactile and multi-modality service | CR | Xiaomi | 22.847 18.0.0 CR#4 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
noted | [WTS] [JSN] |
S1-214083 | CR22.261v18.4.0 Adding definition of terminology for AMMT |
CR revised to S1-214269 |
OPPO | 22.261 18.4.0 CR#598 catF | AMMT | Rel-18 |
S1-96-e AI: 7.3.1 |
revised | [WTS] [JSN] |
S1-214084 | Update the general section of PIRates |
CR revised to S1-214275 |
vivo, KPN, Futurewei | 22.261 18.4.0 CR#599 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214085 | Update the gateways section of PIRates |
CR revised to S1-214276 |
vivo, KPN | 22.261 18.4.0 CR#600 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214086 | Update the operation without 5G core network connectivity section of PIRates | CR | vivo, KPN | 22.261 18.4.0 CR#601 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
noted | [WTS] [JSN] |
S1-214087 | Update the discovery section of PIRates |
CR revised to S1-214277 |
vivo, KPN | 22.261 18.4.0 CR#602 catC | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214088 | Update the security section of PIRates | CR | vivo, KPN | 22.261 18.4.0 CR#603 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
noted | [WTS] [JSN] |
S1-214089 | Update the creation and management section of PIRates |
CR revised to S1-214278 |
vivo, KPN, Futurewei | 22.261 18.4.0 CR#604 catC | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214090 | Addition of PIN requirement for credentials provisioning |
CR revised to S1-214281 |
vivo, KPN, Futurewei | 22.101 18.2.0 CR#578 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214091 | Correction on the definition of PIN and PIN Element |
CR revised to S1-214280 |
vivo, KPN | 22.261 18.4.0 CR#605 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214092 | Update the 5G LAN requirements for PIRates | CR | vivo, KPN | 22.261 18.4.0 CR#606 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
noted | [WTS] [JSN] |
S1-214093 | Correction for 5G-RG | CR | vivo, KPN | 22.261 18.4.0 CR#607 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214094 | Definitions for non 3GPP device | CR | vivo, KPN | 22.261 18.4.0 CR#608 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
noted | [WTS] [JSN] |
S1-214095 | PIRates requirements for PWS & ecall | CR | vivo, KPN | 22.261 18.4.0 CR#609 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
noted | [WTS] [JSN] |
S1-214096 | Pirates general introduction – missing background text |
CR revised to S1-214282 |
vivo, KPN | 22.261 18.4.0 CR#610 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214097 | Format Corrections on Consolidated Potential requirements |
CR revised to S1-214303 |
vivo | 22.859 18.1.0 CR#19 catF | FS_PIN | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214098 | Revised WID on PIN + Resident Service requirements | WID revised | vivo | PIRates | Rel-18 |
S1-96-e AI: 4 |
agreed | [WTS] [JSN] | |
S1-214099 | Mobile Metaverse Services | discussion | Samsung R&D Institute UK |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214100 | New SID on 5GS-based enhanced Sensing |
SID new revision of S1-213077 |
Xiaomi |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214101 | 3GPP based Wireless Sensing Services |
discussion revision of S1-213078 revised to S1-220133 |
Xiaomi |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214102 | New WID on Feasibility Study on Mobile Multiverse Services | WID new | Samsung R&D Institute UK |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214103 | Discussion on Flocking Use Case requirements for AMMT | discussion | Samsung R&D Institute UK |
S1-96-e AI: 7.12 |
noted | [WTS] [JSN] | |||
S1-214104 | [Draft] Reply LS on Steering of Roaming and Intersystem change |
LS out revised to S1-214213 |
Samsung R&D Institute UK |
S1-96-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-214105 | Discussion on Steering of Roaming at inter-System change | discussion | Samsung R&D Institute UK, Qualcomm |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214106 | New SID on enhancing 5G system integrating with satellite | SID new | China Telecom, CATT |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214107 | Discussion paper of new SID on enhancing 5G system integrating with satellite | discussion | China Telecom, CATT |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214108 | Motivation of supporting computing force network | discussion | China Mobile Com. Corporation |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214109 | New SID on supporting computing force network | SID new | China Mobile Com. Corporation |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214110 | TACMM CR Consolidation of potential requirements |
CR revised to S1-214297 |
China Mobile Com. Corporation, Huawei, Interdigital, LG Electronic, Futurewei | 22.847 18.0.0 CR#5 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214111 | TACMM CR Consolidation of KPIs |
CR revised to S1-214298 |
China Mobile Com. Corporation, China Mobile, Huawei, Interdigital, LG Electronic | 22.847 18.0.0 CR#6 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214112 | Reply LS to CT1 (cc SA2, SA3-LI) on indication of country of UE location and its use in PLMN selection |
LS out LS To: CT1 (cc SA2, SA3-LI) revised to S1-214208 |
TNO |
S1-96-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-214113 | TACMM CR Clean up EN and TBD in KPI table in TR22.847 clause 5.2 |
CR revised to S1-214294 |
China Mobile Com. Corporation | 22.847 18.0.0 CR#7 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214114 | Discussion on cleaning up EN and TBD in KPI table in TR22.847 clause 5.2 | discussion | China Mobile Com. Corporation |
S1-96-e AI: 7.11.1 |
noted | [WTS] [JSN] | |||
S1-214115 | Periodic network selection with shared MCC |
CR revised to S1-214210 |
KPN, TNO | 22.011 18.0.0 CR#327 catA | 5GSAT | Rel-18 |
S1-96-e AI: 3 |
revised | [WTS] [JSN] |
S1-214116 | TACMM CR Clean up TBD in KPI table in TR22.847 clause 5.3 |
CR revised to S1-214295 |
China Mobile Com. Corporation | 22.847 18.0.0 CR#8 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214117 | TACMM CR Clean up EN in TR22.847 clause 5.8 |
CR revised to S1-214296 |
China Mobile Com. Corporation | 22.847 18.0.0 CR#9 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214118 | TACMM CR Add conclusion |
CR revised to S1-214299 |
China Mobile Com. Corporation | 22.847 18.0.0 CR#10 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214119 | LS Response on the scope of applying Network Slicing feature in Rel-17 and Rel-16 | LS out | China Mobile Com. Corporation |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214120 | TACMM CR Introduction of text for Tactile and multi-modal communication service |
CR revised to S1-214300 |
China Mobile Com. Corporation, InterDigital, Huawei | 22.261 18.4.0 CR#611 catB | TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214121 | TACMM discussion on PR consolidation | discussion | China Mobile Com. Corporation, China Mobile, Huawei, InterDigital, Futurewei |
S1-96-e AI: 7.11.1 |
noted | [WTS] [JSN] | |||
S1-214122 | Editorial changes to TR22.926 | pCR | TNO | 22.926 1.0.0 | FS_5GET | Rel-18 |
S1-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-214123 | 5GET, adding a note on country borders | pCR | TNO | 22.926 1.0.0 | FS_5GET | Rel-18 |
S1-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-214124 | Editorial correction of reference |
CR revised to S1-214258 |
Peraton Labs, CISA ECD, Verizon, AT&T, T-Mobile US | 22.153 17.2.0 CR#51 catD | MPS2 | Rel-17 |
S1-96-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-214125 | New SID on Enhanced Relay Communication with High Reliability and High Data Rate | SID new | China Telecom Corporation Ltd. |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214126 | Editorial correction of reference (Rel-18 Mirror) |
CR revised to S1-214259 |
Peraton Labs | 22.153 18.0.0 CR#52 catD | MPS2 | Rel-18 |
S1-96-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-214127 | Discussion on Study on Enhanced Relay Communication with High Reliability and High Data Rate | discussion | China Telecom Corporation Ltd. |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214128 | MPS for DTS description alignment |
CR revised to S1-214260 |
Peraton Labs, CISA ECD,Verizon, AT&T, T-Mobile US | 22.153 17.2.0 CR#53 catF | MPS2 | Rel-17 |
S1-96-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-214129 | MPS for DTS description alignment (Rel-18 Mirror) |
CR revised to S1-214261 |
Peraton Labs, CISA ECD,Verizon, AT&T, T-Mobile US | 22.153 18.0.0 CR#54 catF | MPS2 | Rel-18 |
S1-96-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-214130 | FS_TACMM resolving the ENs in clause 5.1 | discussion | Huawei Technologies R&D UK |
S1-96-e AI: 7.11.1 |
noted | [WTS] [JSN] | |||
S1-214131 | MPS and Supplementary Services Interactions |
CR revised to S1-214310 |
Peraton Labs, CISA ECD, Verizon, AT&T, T-Mobile US | 22.153 18.0.0 CR#55 catB | TEI18 | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214132 | Resolving the Editor’s Notes in clause 5.1 |
CR revised to S1-214290 |
Huawei, HiSilicon, InterDigital, China Mobile | 22.847 18.0.0 CR#11 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214133 | Discussion paper on security requirements in PWS in NPN | discussion | Apple |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214134 | New SID: Study on Energy Harvesting enabled Communication Services in 5GS | SID new | OPPO |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214135 | Motivation on support Energy Harvesting enabled Communication services in 5GS |
discussion revised to S1-220119 |
OPPO |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214136 | Security requirement for PWS in NPN | CR | Apple | 22.261 17.8.0 CR#612 catF | NPN_PWS | Rel-17 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] |
S1-214137 | Security requirement for PWS in NPN | CR | Apple | 22.261 18.4.0 CR#613 catA | NPN_PWS | Rel-18 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] |
S1-214138 | Reply to LS on support of PWS over SNPN | LS out | Apple |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214139 | Clarification of Service Providers for PALS |
CR revised to S1-214286 |
Intel, Futurewei | 22.261 18.4.0 CR#614 catF | PALS | Rel-18 |
S1-96-e AI: 7.8.1 |
revised | [WTS] [JSN] |
S1-214140 | Elaborating potential requirements for transportation convenience service |
pCR revised to S1-214270 |
Kyonggi University | 22.89 0.5.0 | FS_RAILSS | Rel-18 |
S1-96-e AI: 7.2.1 |
revised | [WTS] [JSN] |
S1-214141 | Scalable transportation convenience service for the passengers with the reduced mobility |
pCR revised to S1-214219 |
Kyonggi University | 22.89 0.5.0 | FS_RAILSS | Rel-18 |
S1-96-e AI: 7.2.1 |
revised | [WTS] [JSN] |
S1-214142 | Resolving editor notes in 22.926 | pCR | TNO | 22.926 1.0.0 | FS_5GET | Rel-18 |
S1-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-214143 | New WID on support of non-3GPP satellite access for legacy satellite UE not supporting 5GC NAS | WID new | China Mobile Com. Corporation |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214144 | New REl-18 Mini-work item on Passive Internet of Things (Passive IoT) for 5G-Advanced | WID new | Vodafone, BOSCH, BMW Brilliance Automotive, CAICT, CATT, China Mobile, China Telecom, China Unicom, EDF, Futurewei, HiSilicon, Huawei, KPN, Novamint, NTT DOCOMO, Quanray, Spreadtrum |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214145 | Initial requirements for Passive IoT | CR | Vodafone, BMW Brilliance Automotive, CAICT, CATT, China Mobile, China Telecom, China Unicom, EDF, Futurewei, HiSilicon, Huawei, KPN, Novamint, NTT DOCOMO, Quanray, Spreadtrum | 22.261 18.4.0 CR#615 catB | LPHAP | Rel-18 |
S1-96-e AI: 4 |
noted | [WTS] [JSN] |
S1-214146 | Support of non-3GPP satellite access for legacy satellite UE not supporting N1 mode | CR | China Mobile Com. Corporation | 22.261 18.4.0 CR#616 catB | TEI18 | Rel-18 |
S1-96-e AI: 4 |
noted | [WTS] [JSN] |
S1-214147 | Performance requirements for Passive IoT | CR | Vodafone, BMW Brilliance Automotive, CAICT, CATT, China Mobile, China Telecom, China Unicom, EDF, Futurewei, HiSilicon, Huawei, KPN, Novamint, NTT DOCOMO, Quanray, Spreadtrum | 22.261 18.4.0 CR#617 catB | LPHAP | Rel-18 |
S1-96-e AI: 4 |
noted | [WTS] [JSN] |
S1-214148 | Motivation of support Passive IoT in non-public network | discussion | Alibaba Group |
S1-96-e AI: 4 |
withdrawn | [WTS] [JSN] | |||
S1-214149 | Study on Passive IoT in non-public network | SID new | Alibaba Group |
S1-96-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-214150 | New WID on enhanced capability for SMS | WID new | China Mobile Com. Corporation |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214151 | Enhanced capability for high priority short message delivery | CR | China Mobile Com. Corporation | 22.261 18.4.0 CR#618 catB | TEI18 | Rel-18 |
S1-96-e AI: 4 |
noted | [WTS] [JSN] |
S1-214152 | Motivation of support Passive IoT in non-public network |
discussion revised to S1-220135 |
Alibaba Group |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214153 | CPR Mapping | CR | Qualcomm Incorporated | 22.839 18.0.0 CR#1 catD | FS_VMR | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214154 | CR adding NPN clarification plus editorials | CR | Qualcomm Incorporated | 22.261 18.4.0 CR#619 catF | VMR | Rel-18 |
S1-96-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-214155 | Proposal on Human readable name for NW slices | other | Qualcomm Incorporated |
S1-96-e AI: 7.12 |
noted | [WTS] [JSN] | |||
S1-214156 | Introduction of TACMM requirements | CR | Xiaomi | 22.261 18.4.0 CR#620 catB | TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
merged | [WTS] [JSN] |
S1-214157 | CR on Human readable name for NW slices | CR | Qualcomm Incorporated | 22.261 18.4.0 CR#621 catC | EASNS | Rel-18 |
S1-96-e AI: 7.12 |
noted | [WTS] [JSN] |
S1-214158 | Correction of editorial issues |
CR revised to S1-214289 |
Xiaomi | 22.847 18.0.0 CR#12 catD | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214159 | New WID on Emergency Short Message Service | WID new | Orange Spain |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214160 | Clarification of one MCC representing multiple political entities | CR | Apple | 22.011 17.4.0 CR#328 catF | 5GSAT | Rel-17 |
S1-96-e AI: 3 |
merged | [WTS] [JSN] |
S1-214161 | Clarification of one MCC representing multiple political entities | CR | Apple | 22.011 18.0.0 CR#329 catA | 5GSAT | Rel-18 |
S1-96-e AI: 3 |
merged | [WTS] [JSN] |
S1-214162 | Adding leftover PIN requirement to normative spec |
CR revised to S1-214279 |
Philips International B.V. | 22.261 18.4.0 CR#622 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214163 | Adding leftover PIN requirement to consolidated requirements |
CR revised to S1-214308 |
Philips International B.V. | 22.859 18.1.0 CR#20 catF | FS_PIN | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214164 | Replacing undefined term PIN User |
CR revised to S1-214283 |
Philips International B.V. | 22.261 18.4.0 CR#623 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214165 | Clarifying Licensed Intercept requirement |
CR revised to S1-214284 |
Philips International B.V. | 22.261 18.4.0 CR#624 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214166 | NPN support for positioning service requirement | CR | Philips International B.V. | 22.261 17.8.0 CR#625 catF | TEI17, AVPROD | Rel-17 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214167 | NPN support for positioning service requirement | CR | Philips International B.V. | 22.261 18.4.0 CR#626 catA | AVPROD, TEI17 | Rel-18 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214168 | Automatic monitoring of smart station | pCR | Hansung University, LGUplus, ETRI | 22.89 0.5.0 | FS_RAILSS | Rel-18 |
S1-96-e AI: 7.2.1 |
noted | [WTS] [JSN] |
S1-214169 | Emergency SMS requirements | CR | Orange, Huawei, Ericsson | 22.101 18.2.0 CR#580 catB | TEI18 | Rel-18 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] |
S1-214170 | Announcing the release of the “IoT and Edge Computing impact on Beyond 5G: enabling technologies and challenges” to 3GPP SA1 | LS in | AIOTI |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214171 | LS on Steering of Roaming and Intersystem change | LS in | C1-214780 |
S1-96-e AI: 3 |
replied to | [WTS] [JSN] | |||
S1-214172 | LS on Private call forwarding | LS in | C1-214882 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214173 | LS on UE configuration for warning messages reception when using a PLMN subscription to access an SNPN | LS in | C1-214953 |
S1-96-e AI: 3 |
replied to | [WTS] [JSN] | |||
S1-214174 | Reply LS on limited service availability of an SNPN | LS in | C1-215046 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214175 | LS on the scope of applying Network Slicing feature in Rel-17 and Rel-16 | LS in | C1-215137 |
S1-96-e AI: 3 |
replied to | [WTS] [JSN] | |||
S1-214176 | Reply LS on limited service availability of an SNPN | LS in | C1-216096 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214177 | 3GPP SA1 clarifications on problematic UAV | LS in | GSMA ACJA |
S1-96-e AI: 3 |
withdrawn | [WTS] [JSN] | |||
S1-214178 | APT report on emerging critical applications & use cases of imt for industrial, societal and enterprise users | LS in | APT Wireless Group |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214179 | LS on Prioritized Vehicle to Cloud Technical Solutions | LS in | Automotive Edge Computing Consortium (AECC) |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214180 | LS from NRG to 3GPP on Emergency Communication Improvement | LS in | GSMA NRG 012_200r1 |
S1-96-e AI: 3 |
replied to | [WTS] [JSN] | |||
S1-214181 | LS on Slice list and priority information for cell reselection | LS in | R2-2108928 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214182 | Reply LS on UAC enhancements for minimization of service interruption when disaster condition applies | LS in | R2-2109173 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214183 | Reply LS to GSMA-ACJA: 3GPP SA1 clarifications on problematic UAV | LS in | S2-214916 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214184 | LS on IMEI for Non-Public Networks/Private Networks without using USIM | LS in | S2-2108093 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214185 | Reply LS for clarification on managing expired or multiple Protection Scheme and Home Network keys used for SUCI calculation | LS in | S3-213218 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214186 | Reply to LS on support of PWS over SNPN | LS in | S3-213609 |
S1-96-e AI: 3 |
replied to | [WTS] [JSN] | |||
S1-214187 | LS on new SID on Application Enablement for Data Integrity Verification Service in IOT | LS in | S6-211496 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214188 | LS on information about draft Recommendation ITU-T Y.frd: "Framework and Requirements of Network-oriented Data Integrity Verification Service based on Blockchain in Future Network” | LS in | ITU-T Working Party 3/13 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214189 | Reply LS to 5G-ACIA on 5G capabilities exposure for factories of the future | LS in | SP-211134 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214190 | Reply LS on Inclusive language review | LS in | SP-211140 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214191 | 3GPP SA1 clarifications on problematic UAV | LS in | S1-213179 / S1-211273/ GSMA ACJA LS_UAV |
S1-96-e AI: 3 |
replied to | [WTS] [JSN] | |||
S1-214192 | Reply LS to GSMA-ACJA: 3GPP SA1 clarifications on problematic UAV |
LS out LS To: GSMA-ACJA |
S1-213193 / S2-214916 |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214193 | Indication of country of UE location and its use in PLMN selection | LS in | S1-213206 / C1-214778 |
S1-96-e AI: 3 |
replied to | [WTS] [JSN] | |||
S1-214194 | LS on new SID on Application Enablement for Data Integrity Verification Service in IOT | LS in | S1-213195 |
S1-96-e AI: 3 |
withdrawn | [WTS] [JSN] | |||
S1-214195 | SA1 Rel-18 Normative Work - with indications of possible RAN impact - | other | SA1 chairperson |
S1-96-e AI: 2 |
revised | [WTS] [JSN] | |||
S1-214196 | Rel-19 timeline proposal | other | SA1 chairperson |
S1-96-e AI: 2 |
endorsed | [WTS] [JSN] | |||
S1-214197 | Preparations for SA1#96e | other | SA1 chairperson |
S1-96-e AI: 2 |
noted | [WTS] [JSN] | |||
S1-214198 | Schedule for Vice Chairs election SA1#96e | other | SA1 chairperson |
S1-96-e AI: 2 |
noted | [WTS] [JSN] | |||
S1-214199 | SA1-related topics at SA#93e |
report revision of S1-214003 |
Chair |
S1-96-e AI: 2 |
noted | [WTS] [JSN] | |||
S1-214200 | Definitions for non 3GPP device | CR | vivo, KPN, Philips International B.V. | 22.101 18.2.0 CR#579 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
noted | [WTS] [JSN] |
S1-214201 | Draft LS from NRG to 3GPP on Emergency Communication Improvement | LS out | Orange |
S1-96-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-214202 | CR related to UAV | other | Qualcomm |
S1-96-e AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-214203 | LS to CT1 on LS on Periodic PLMN selection with Shared MCCs |
LS out LS To: LS to CT1 revised to S1-214207 |
SA1 |
S1-96-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-214204 | LS to GSMA NRG (cc SA2, ETSI TC EMTEL) on LS on Emergency Communication Improvement |
LS out LS To: GSMA NRG (cc SA2, ETSI TC EMTEL) revised to S1-214240 |
SA1 |
S1-96-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-214205 | Addition of PALs requirement for manual selection |
CR revision of S1-214034 revised to S1-214285 |
vivo | 22.261 18.4.0 CR#627 catB | PALS | Rel-18 |
S1-96-e AI: 7.8.1 |
revised | [WTS] [JSN] |
S1-214206 | Resolving the Editor s Note in the KPI table in clause 5.1 |
CR revised to S1-214291 |
Huawei, HiSilicon, InterDigital, China Mobile, Deutsche Telekom | 22.847 18.0.0 CR#13 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214207 | LS to CT1 on LS on Periodic PLMN selection with Shared MCCs |
LS out LS To: CT1 revision of S1-214203 |
SA1 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-214208 | LS to CT1 (cc SA2, SA3-LI) on Reply LS on Indication of country of UE location and its use in PLMN |
LS out LS To: CT1 (cc SA2, SA3-LI) revision of S1-214112 |
SA1 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-214209 | Periodic network selection with shared MCC |
CR revision of S1-214074 |
KPN, TNO, Qualcomm, Apple, Ericsson, Deutsche Telekom | 22.011 17.4.0 CR#3261 catF | 5GSAT | Rel-17 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] |
S1-214210 | Periodic network selection with shared MCC |
CR revision of S1-214115 |
KPN, TNO, Qualcomm, Apple, Ericsson, Deutsche Telekom | 22.011 18.0.0 CR#3271 catA | 5GSAT | Rel-18 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] |
S1-214211 | Update to Smart Grid normative requirements |
CR revision of S1-214058 revised to S1-214273 |
Qualcomm | 22.104 18.2.0 CR#91 catF | SEI | Rel-18 |
S1-96-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-214212 | Way forward for non-3GPP device definition | other | Vivo |
S1-96-e AI: 7.7.1 |
noted | [WTS] [JSN] | |||
S1-214213 | LS to CT1 on Reply LS on Steering of Roaming and Intersystem change |
LS out LS To: CT1 revision of S1-214104 |
SA1 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-214214 | Clarification of NPN in 22.261 |
CR revised to S1-214237 |
Nokia, Nokia Shanghai Bell, Phillips International B.V. | 22.261 18.4.0 CR#628 catA | TEI16, eCAV | Rel-18 |
S1-96-e AI: 3 |
revised | [WTS] [JSN] |
S1-214215 | Cover sheet of the TR22.926 for approval | TS or TR cover | Rapporteur (Thales) | FS_5GET | Rel-18 |
S1-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] | |
S1-214216 | TR 22.926 v.1.1.0 on FS_GET | draft TR | Rapporteur | FS_5GET | Rel-18 |
S1-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] | |
S1-214217 | Cover page for FS_OffnetRail | TS or TR cover | Rapporteur | FS_OffNetRail | Rel-18 |
S1-96-e AI: 7.5.1 |
agreed | [WTS] [JSN] | |
S1-214218 | TR 22.990 v.1.1.0 on FS_OffnetRail | draft TR | Rapporteur | FS_OffNetRail | Rel-18 |
S1-96-e AI: 7.5.1 |
agreed | [WTS] [JSN] | |
S1-214219 | TR 22.890 on FS_RAILSS |
pCR revision of S1-214141 |
Rapporteur | 22.89 0.5.0 | FS_RAILSS | Rel-18 |
S1-96-e AI: 7.2.1 |
agreed | [WTS] [JSN] |
S1-214220 | FS_RAILSS Status report | report | Hansung University |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214221 | FS_5GET Status report | report | THALES |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214222 | FS_OffNetRail Status report | report | UIC |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214223 | FS_eFRMCS Status report | report | UIC |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214224 | FS_TACMM Status report | report | China Mobile |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214225 | SACI_MCS Status report | report | BDBOS |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214226 | AMMT Status report | report | OPPO |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214227 | SEI Status report | report | China Telecom |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214228 | Pirates Status report | report | Vivo |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214229 | PALS Status report | report | Qualcomm |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214230 | VMR Status report | report | Qualcomm |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214231 | TACMM Status report | report | China Mobile |
S1-96-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-214232 | SA1 Rel-18 Normative Work - with indications of possible RAN impact - | other | SA1 chairperson |
S1-96-e AI: 2 |
noted | [WTS] [JSN] | |||
S1-214233 | LS to CT1 (cc CT6) on Reply to LS on UE PWS reception when using a PLMN subscription to |
LS out LS To: CT1 (cc CT6) |
SA1 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-214234 | LS to CT1, SA2 on LS on the scope of applying Network Slicing feature in Rel-17 and Rel |
LS out LS To: CT1, SA2 |
SA1 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-214235 | Clarification of NPN in 22.261 |
CR revision of S1-214045 |
Nokia, Nokia Shanghai Bell, Phillips International B.V. | 22.261 16.15.0 CR#5841 catF | TEI16, eCAV | Rel-16 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] |
S1-214236 | Clarification of NPN in 22.261 |
CR revision of S1-214046 |
Nokia, Nokia Shanghai Bell, Phillips International B.V. | 22.261 17.8.0 CR#5851 catA | TEI16, eCAV | Rel-17 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] |
S1-214237 | Clarification of NPN in 22.261 |
CR revision of S1-214214 |
Nokia, Nokia Shanghai Bell, Phillips International B.V. | 22.261 18.4.0 CR#6281 catA | TEI16, eCAV | Rel-18 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] |
S1-214238 | LS to GSMA-ACJA, SA2, SA6 (cc SA3) on Reply LS on 3GPP SA1 clarifications on problematic UAV |
LS out LS To: GSMA-ACJA, SA2, SA6 (cc SA3) revision of S1-214025 |
SA1 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-214239 | Addition of a note to [R-5.1-017] related to the applicability of the requirement |
CR revision of S1-214024 revised to S1-214311 |
Huawei | 22.125 17.4.0 CR#411 catC | ID_UAS | Rel-17 |
S1-96-e AI: 3 |
revised | [WTS] [JSN] |
S1-214240 | LS to GSMA NRG (cc SA2, ETSI TC EMTEL) on LS on Emergency Communication Improvement |
LS out LS To: GSMA NRG (cc SA2, ETSI TC EMTEL) revision of S1-214204 |
SA1 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-214241 | New SID on Additional capabilities of mobile networks for drone |
SID new revised to S1-220141 |
China Mobile |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214242 | New SID on Integrated Sensing and Communication | SID new | China Mobile |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214243 | New SID on 5GS-based enhanced Sensing | SID new | Xiaomi |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214244 | Feasibility Study on 5G System Support for a Network of Service Robots | SID new | LG Electronics, LG Uplus, OPPO, KRRI, China Unicom, Qualcomm, Kyonggi |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214245 | WID on study on enhanced 5G functionalities for application AI/ML services | SID new | OPPO |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214246 | New study on network sharing in 5GS | SID new | China Unicom, China Telecom |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214247 | New WID on Feasibility Study on Mobile Multiverse Services | WID new | Samsung, LG Uplus, Tencent, KDDI, Orange |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214248 | New SID on enhancing 5G system integrating with satellite | SID new | China Telecom,CATT |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214249 | New SID on supporting computing force network | SID new | China Mobile |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214250 | New SID: Study on Energy Harvesting enabled Communication Services in |
SID new revised to S1-220118 |
OPPO |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214251 | Study on Passive IoT in non-public network | SID new | Alibaba |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214252 | New SID on Enhanced Relay Communication with High Reliability and High Data | SID new | China Telecom |
S1-96-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-214253 | CR inclusive language correction to T22.125 clause 1 |
CR revision of S1-214016 |
Huawei | 22.125 17.4.0 CR#391 catD | ID_UAS | Rel-17 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214254 | CR to T22.125 for correction and readability improvement clause 4.2 and clause |
CR revision of S1-214017 |
Huawei | 22.125 17.4.0 CR#401 catC | ID_UAS | Rel-17 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214255 | Clarification of NPN in 22.261 |
CR revision of S1-214050 |
Nokia, Nokia Shanghai Bell, Philips International B.V. | 22.261 17.8.0 CR#5861 catF | AVPROD, TEI17 | Rel-17 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214256 | Clarification of NPN in 22.261 |
CR revision of S1-214051 |
Nokia, Nokia Shanghai Bell, Philips International B.V. | 22.261 18.4.0 CR#5871 catA | AVPROD, TEI17 | Rel-18 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214257 | Change to Annex D on use of IMC |
CR revision of S1-214052 |
Nokia, Nokia Shanghai Bell | 22.228 17.0.0 CR#2341 catF | TEI17 | Rel-17 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214258 | Editorial correction of reference |
CR revision of S1-214124 |
Peraton Labs, CISA ECD, Verizon, AT&T, T-Mobile US | 22.153 17.2.0 CR#511 catD | MPS2 | Rel-17 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214259 | Editorial correction of reference (Rel-18 Mirror) |
CR revision of S1-214126 |
Peraton Labs, CISA ECD, Verizon, AT&T, T-Mobile US | 22.153 18.0.0 CR#521 catD | MPS2 | Rel-18 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214260 | MPS for DTS description alignment |
CR revision of S1-214128 |
Peraton Labs, CISA ECD,Verizon, AT&T, T-Mobile US | 22.153 17.2.0 CR#531 catF | MPS2 | Rel-17 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214261 | MPS for DTS description alignment (Rel-18 Mirror) |
CR revision of S1-214129 |
Peraton Labs, CISA ECD,Verizon, AT&T, T-Mobile US | 22.153 18.0.0 CR#541 catF | MPS2 | Rel-18 |
S1-96-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-214262 | Clarification to NPN requirements on USIM and multiple subscriptions |
CR revision of S1-214067 |
Qualcomm | 22.261 16.15.0 CR#5911 catF | TEI16 | Rel-16 |
S1-96-e AI: 6.2 |
agreed | [WTS] [JSN] |
S1-214263 | Clarification to NPN requirements on USIM and multiple subscriptions |
CR revision of S1-214069 |
Qualcomm | 22.261 17.8.0 CR#5921 catA | TEI17 | Rel-17 |
S1-96-e AI: 6.2 |
agreed | [WTS] [JSN] |
S1-214264 | Clarification to NPN requirements on USIM and multiple subscriptions |
CR revision of S1-214070 |
Qualcomm | 22.261 18.4.0 CR#5931 catA | TEI18 | Rel-18 |
S1-96-e AI: 6.2 |
agreed | [WTS] [JSN] |
S1-214265 | Clarification on VR sync requirements |
CR revision of S1-214071 |
Qualcomm | 22.261 16.15.0 CR#5941 catF | TEI16 | Rel-16 |
S1-96-e AI: 6.2 |
agreed | [WTS] [JSN] |
S1-214266 | Correction of network condition change per UE |
CR revision of S1-214040 |
InterDigital | 22.261 18.4.0 CR#5831 catF | AMMT | Rel-18 |
S1-96-e AI: 7.3.1 |
agreed | [WTS] [JSN] |
S1-214267 | Update to charging requirements for AMMT | CR | OPPO | 22.261 18.4.0 CR#629 catB | AMMT | Rel-18 |
S1-96-e AI: 7.3.1 |
agreed | [WTS] [JSN] |
S1-214268 | Adding requirement of FL for AMMT |
CR revision of S1-214080 |
OPPO | 22.261 18.4.0 CR#5971 catB | AMMT | Rel-18 |
S1-96-e AI: 7.3.1 |
agreed | [WTS] [JSN] |
S1-214269 | Adding definition of terminology for AMMT |
CR revision of S1-214083 |
OPPO | 22.261 18.4.0 CR#5981 catF | AMMT | Rel-18 |
S1-96-e AI: 7.3.1 |
agreed | [WTS] [JSN] |
S1-214270 | Elaborating potential requirements for transportation convenience service |
pCR revision of S1-214140 |
Kyonggi University | 22.89 0.5.0 | FS_RAILSS | Rel-18 |
S1-96-e AI: 7.2.1 |
agreed | [WTS] [JSN] |
S1-214271 | Proposed 9.2 Guidelines for handling extra-territoriality in the 3GPP system |
pCR revision of S1-214054 |
Thales, TNO, Samsung | 22.926 1.0.0 | FS_5GET | Rel-18 |
S1-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-214272 | Correction of references for clause 2 |
CR revision of S1-214013 |
Huawei | 22.104 18.2.0 CR#891 catC | SEI | Rel-18 |
S1-96-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-214273 | Update to Smart Grid normative requirements |
CR revision of S1-214211 |
Qualcomm | 22.104 18.2.0 CR#911 catF | SEI | Rel-18 |
S1-96-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-214274 | Alignment with new added smart grid |
CR revision of S1-214065 |
ZTE | 22.261 18.4.0 CR#5901 catD | SEI | Rel-18 |
S1-96-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-214275 | Update the general section of PIRates |
CR revision of S1-214084 |
vivo, KPN, Futurewei | 22.261 18.4.0 CR#5991 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214276 | Update the gateways section of PIRates |
CR revision of S1-214085 |
vivo, KPN | 22.261 18.4.0 CR#6001 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214277 | Update the discovery section of PIRates |
CR revision of S1-214087 |
vivo, KPN, InterDigital | 22.261 18.4.0 CR#6021 catC | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214278 | Update the creation and management section of PIRates |
CR revision of S1-214089 |
vivo, KPN, Futurewei | 22.261 18.4.0 CR#6041 catC | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214279 | Adding leftover PIN requirement to normative spec |
CR revision of S1-214162 revised to S1-214312 |
Philips International B.V. | 22.261 18.4.0 CR#6221 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214280 | Correction on the definition of PIN and PIN Element |
CR revision of S1-214091 |
vivo, KPN | 22.261 18.4.0 CR#6051 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214281 | Addition of PIN requirement for credentials provisioning |
CR revision of S1-214090 |
vivo, KPN, Futurewei, Intel | 22.101 18.2.0 CR#5781 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214282 | Pirates general introduction missing background text |
CR revision of S1-214096 |
vivo, KPN, Intel | 22.261 18.4.0 CR#6101 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214283 | Replacing undefined term PIN User |
CR revision of S1-214164 revised to S1-214313 |
Philips International B.V. | 22.261 18.4.0 CR#6231 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214284 | Clarifying Lawful Intercept requirements |
CR revision of S1-214165 revised to S1-214314 |
Philips International B.V. | 22.261 18.4.0 CR#6241 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-214285 | Addition of PALs requirement for manual selection |
CR revision of S1-214205 |
vivo | 22.261 18.4.0 CR#6271 catB | PALS | Rel-18 |
S1-96-e AI: 7.8.1 |
agreed | [WTS] [JSN] |
S1-214286 | Clarification of Service Providers for PALS |
CR revision of S1-214139 |
Intel, Futurewei, Charter Communications, Qualcomm | 22.261 18.4.0 CR#6141 catF | PALS | Rel-18 |
S1-96-e AI: 7.8.1 |
agreed | [WTS] [JSN] |
S1-214287 | Triggering a change of communication privileges for a particular FRMCS User based on identities and/or talker status |
CR revision of S1-214027 revised to S1-214315 |
UIC | 22.989 18.2.0 CR#81 catC | FS_eFRMCS | Rel-18 |
S1-96-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-214288 | Alignment between Changing conditions of Railway Emergency Alert and Merging Railway Emergency Alert |
CR revision of S1-214029 revised to S1-214316 |
UIC | 22.989 18.2.0 CR#101 catC | FS_eFRMCS | Rel-18 |
S1-96-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-214289 | Correction of editorial issues |
CR revision of S1-214158 revised to S1-214317 |
Xiaomi | 22.847 18.0.0 CR#121 catD | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214290 | Resolving the Editor s Notes in clause 5.1 |
CR revision of S1-214132 |
Huawei, HiSilicon, InterDigital, China Mobile, Deutsche Telekom | 22.847 18.0.0 CR#111 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214291 | Resolving the Editor s Note in the KPI table in clause 5.1 |
CR revision of S1-214206 |
Huawei, HiSilicon, InterDigital, China Mobile, Deutsche Telekom | 22.847 18.0.0 CR#131 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214292 | Update of the KPI table in clause 5.4 |
CR revision of S1-214059 |
LG Electronics | 22.847 18.0.0 CR#31 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214293 | Verification of KPIs for the use case in clause 5.5 |
CR revision of S1-214012 |
InterDigital | 22.847 18.0.0 CR#11 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214294 | Clean up EN and TBD in KPI table in TR22.847 clause 5.2 |
CR revision of S1-214113 revised to S1-214318 |
China Mobile | 22.847 18.0.0 CR#71 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214295 | Clean up EN and TBD in KPI table in TR22.847 clause 5.3 |
CR revision of S1-214116 revised to S1-214319 |
China Mobile | 22.847 18.0.0 CR#81 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214296 | Clean up EN and TBD in KPI table in TR22.847 clause 5.2 |
CR revision of S1-214117 revised to S1-214320 |
China Mobile | 22.847 18.0.0 CR#91 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214297 | TACMM Consolidation of potential requirements |
CR revision of S1-214110 revised to S1-214321 |
China Mobile, Huawei, Interdigital, Futurewei, China Southern Power Grid | 22.847 18.0.0 CR#51 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214298 | TACMM Consolidation of KPIs |
CR revision of S1-214111 revised to S1-214322 |
China Mobile, Huawei, Interdigital, LG Electronics, China Southern Power Grid | 22.847 18.0.0 CR#61 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214299 | TACMM Add conclusion |
CR revision of S1-214118 revised to S1-214323 |
China Mobile | 22.847 18.0.0 CR#101 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214300 | Introduction of text for Tactile and multi-modal communication service |
CR revision of S1-214120 revised to S1-214324 |
China Mobile, InterDigital, Huawei | 22.261 18.4.0 CR#6111 catB | TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-214301 | FS_AMMT update to CPR tables with new format |
CR revision of S1-214037 |
OPPO | 22.874 18.1.0 CR#31 catD | FS_AMMT | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214302 | Filling all CPRs into a normalized table |
CR revision of S1-214018 revised to S1-214325 |
China Telecom | 22.867 18.1.0 CR#201 catD | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214303 | Format Corrections on Consolidated Potential requirements |
CR revision of S1-214097 |
vivo | 22.859 18.1.0 CR#191 catF | FS_PIN | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214304 | CPR# to PR# Mapping for PALS |
CR revision of S1-214057 |
Qualcomm | 22.844 18.1.0 CR#91 catF | FS_PALS | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214305 | Get the missing figure A.1-1 back |
CR revision of S1-214010 revised to S1-214326 |
China Telecom | 22.867 18.1.0 CR#171 catD | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
revised | [WTS] [JSN] |
S1-214306 | Removal of all existing Editor s Notes in TR 22.867 |
CR revision of S1-214011 |
China Telecom | 22.867 18.1.0 CR#181 catD | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214307 | Reference corrections for clause 2 and clauses in 5.13 |
CR revision of S1-214014 |
Huawei | 22.867 18.1.0 CR#191 catC | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214308 | Adding leftover PIN requirement to consolidated requirements |
CR revision of S1-214163 |
Philips International B.V. | 22.859 18.1.0 CR#201 catF | FS_PIN | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214309 | CR Editorial to T22.125 clause 6.4 and clause 7.1 |
CR revision of S1-214015 |
Huawei | 22.125 17.4.0 CR#381 catD | ID_UAS | Rel-17 |
S1-96-e AI: 5 |
agreed | [WTS] [JSN] |
S1-214310 | MPS and Supplementary Services Interactions |
CR revision of S1-214131 |
Peraton Labs, CISA ECD, Verizon, AT&T, T-Mobile US | 22.153 18.0.0 CR#551 catB | TEI18 | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214311 | Addition of a note to [R-5.1-017] related to the applicability of the requirement |
CR revision of S1-214239 |
Huawei | 22.125 17.4.0 CR#412 catC | ID_UAS | Rel-17 |
S1-96-e AI: 3 |
agreed | [WTS] [JSN] |
S1-214312 | Adding leftover PIN requirement to normative spec |
CR revision of S1-214279 |
Philips International B.V. | 22.261 18.4.0 CR#6222 catB | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214313 | Replacing undefined term PIN User |
CR revision of S1-214283 |
Philips International B.V. | 22.261 18.4.0 CR#6232 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214314 | Clarifying Lawful Intercept requirements |
CR revision of S1-214284 |
Philips International B.V. | 22.261 18.4.0 CR#6242 catF | PIRates | Rel-18 |
S1-96-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-214315 | Triggering a change of communication privileges for a particular FRMCS User based on identities and/or talker status |
CR revision of S1-214287 |
UIC | 22.989 18.2.0 CR#82 catC | FS_eFRMCS | Rel-18 |
S1-96-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-214316 | Alignment between Changing conditions of Railway Emergency Alert and Merging Railway Emergency Alert |
CR revision of S1-214288 |
UIC | 22.989 18.2.0 CR#102 catC | FS_eFRMCS | Rel-18 |
S1-96-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-214317 | Correction of editorial issues |
CR revision of S1-214289 |
Xiaomi | 22.847 18.0.0 CR#122 catD | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214318 | TACMM CR Clean up EN and TBD in KPI table in TR22.847 clause 5.2 |
CR revision of S1-214294 |
China Mobile | 22.847 18.0.0 CR#72 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214319 | TACMM CR Clean up TBD in KPI table in TR22.847 clause 5.3 |
CR revision of S1-214295 |
China Mobile | 22.847 18.0.0 CR#82 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214320 | TACMM CR Clean up EN in TR22.847 clause 5.8 |
CR revision of S1-214296 |
China Mobile | 22.847 18.0.0 CR#92 catF | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214321 | TACMM CR Consolidation of potential requirements |
CR revision of S1-214297 |
China Mobile, Huawei, Interdigital, LG Electronic, Futurewei | 22.847 18.0.0 CR#52 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214322 | TACMM CR Consolidation of KPIs |
CR revision of S1-214298 |
China Mobile, Huawei, Interdigital, LG Electronic | 22.847 18.0.0 CR#62 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214323 | TACMM CR Add conclusion |
CR revision of S1-214299 |
China Mobile | 22.847 18.0.0 CR#102 catB | FS_TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214324 | TACMM CR Introduction of text for Tactile and multi-modal communication service |
CR revision of S1-214300 |
China Mobile Com. Corporation, InterDigital, Huawei | 22.261 18.4.0 CR#6112 catB | TACMM | Rel-18 |
S1-96-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-214325 | Filling all CPRs into a normalized table |
CR revision of S1-214302 |
China Telecom | 22.867 18.1.0 CR#202 catD | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
S1-214326 | Get the missing figure A.1-1 back |
CR revision of S1-214305 |
China Telecom | 22.867 18.1.0 CR#172 catD | FS_5GSEI | Rel-18 |
S1-96-e AI: 7.12 |
agreed | [WTS] [JSN] |
327 documents (1.0855758190155 seconds)