Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S1-210000 | Draft agenda for SA1#93e | agenda | Chair |
S1-93-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-210001 | 2nd Draft agenda for SA1#93e | agenda | Chair |
S1-93-e AI: 8 |
agreed | [WTS] [JSN] | |||
S1-210002 | Agenda for SA1#93e with tdoc allocation | agenda | Chair |
S1-93-e AI: 8 |
withdrawn | [WTS] [JSN] | |||
S1-210003 | SA1-related topics at SA#90e | report | Chair |
S1-93-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-210004 | Draft minutes of SA1#92e | report | ETSI |
S1-93-e AI: 8 |
revised | [WTS] [JSN] | |||
S1-210005 | Minutes of SA1#92e | report | ETSI |
S1-93-e AI: 8 |
agreed | [WTS] [JSN] | |||
S1-210006 | Workplan presentation for SA1#93e | Work Plan | ETSI |
S1-93-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-210007 | SA1 actions on removing non-inclusive language in all 3GPP Rel-17 TS and TR | response | ETSI MCC |
S1-93-e AI: 5 |
noted | [WTS] [JSN] | |||
S1-210008 | Guidelines for SA1#93e | other | ETSI MCC |
S1-93-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-210009 | Rel-18 chairman's views | other | Chair |
S1-93-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-210010 | Rel-18 timeplan | other | Chair |
S1-93-e AI: 8 |
noted | [WTS] [JSN] | |||
S1-210011 | TR 22.873 v.0.4.1 ("Study on evolution of the IMS MMtel service") | draft TR | China Mobile | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
noted | [WTS] [JSN] | |
S1-210012 | Editorial corrections | pCR | Nokia Shanghai Bell | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
withdrawn | [WTS] [JSN] |
S1-210013 | FS_Resident: New use case on Local control of PRASs connectivity for UEs access to a device in a CPN |
pCR revised to S1-210474 |
InterDigital, KPN, vivo Mobile Communications Co. LTD. | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210014 | FS_AMMT: Mistakes in implementation of Approved pCRs | pCR | InterDigital | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210015 | FS_AMMT: Update of the real time media editing use case | pCR | InterDigital | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210016 | FS_Resident: Resolving the Editor’s note on the use case of seamless switching to a service hosting environment via an evolved residential gateway |
pCR revised to S1-210472 |
InterDigital | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210017 | FS_Ranging conclusions and recommendations | pCR | Beijing Xiaomi Mobile Software | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210018 | FS_Ranging consolidated requirements |
pCR revised to S1-210467 |
Beijing Xiaomi Mobile Software | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210019 | Ranging-based service Requirements (Ranging) |
WID new revised to S1-210363 |
Beijing Xiaomi Mobile Software |
S1-93-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-210020 | Ranging based service requirements | CR | Beijing Xiaomi Mobile Software | 22.261 18.1.1 CR#495 catB | FS_Ranging | Rel-18 |
S1-93-e AI: 4 |
noted | [WTS] [JSN] |
S1-210021 | Presentation of TR22855 |
TS or TR cover revised to S1-210468 |
Beijing Xiaomi Mobile Software | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] | |
S1-210022 | FS_AMMT: Removal of Editor's note from P.R.6.2-I-001 |
pCR revised to S1-210381 |
InterDigital | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210023 | Discussion on Virtualization for Satellite Access | discussion | CAICT |
S1-93-e AI: 7.6.1 |
withdrawn | [WTS] [JSN] | |||
S1-210024 | FS_AMMT – New use-case on local AI/ML model split on factory robots | pCR | InterDigital | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210025 | FS_EASNS clean up of 5.8 |
pCR revised to S1-210423 |
Nokia, Nokia Shanghai Bell | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-210026 | FS_EASNS PR cleanup |
pCR revised to S1-210419 |
Nokia, Nokia Shanghai Bell | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-210027 | FS_EASNS removal of ‘user preference’ | pCR | Nokia, Nokia Shanghai Bell | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-210028 | New use case on IP traffic offload |
pCR revised to S1-210475 |
Spreadtrum Communications | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210029 | New use case on local access control | pCR | Spreadtrum Communications | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
merged | [WTS] [JSN] |
S1-210030 | New use case on RAN sharing |
pCR revised to S1-210476 |
Spreadtrum Communications | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210031 | FS_AMMT update to AI model management as a Service UC |
pCR revised to S1-210385 |
China Telecommunications | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210032 | FS_AMMT add consolidated potential requirements | pCR | China Telecommunications | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210033 | New WID on 5G system with satellite access by considering Network Function on Satellite and Inter Satellite Link (NFSISL) | WID new | Xiaomi |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210034 | Update to KPIs for a 5G system with satellite access in the case gNB and CN compoponet are on the satellite and in the case Inter Satellite Links are used | CR | Xiaomi | 22.261 18.1.1 CR#4831 catF | DUMMY | Rel-18 |
S1-93-e AI: 4 |
noted | [WTS] [JSN] |
S1-210035 | LS to SA2 on response to LS (S2-2007828) on credentials for SNPN service continuity |
LS out revised to S1-210356 |
Deutsche Telekom AG (SA1) |
S1-93-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-210036 | Update of Disscussion paper of Addition of requirements on Data Integrity in 5GS | discussion | China Unicom |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210037 | New WID on Data Integrity in 5G (DI_5G) |
WID new revised to S1-210367 |
China Unicom |
S1-93-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-210038 | Signal level Enhanced Network Selection - Motivation and Proposal | other | Deutsche Telekom AG |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210039 | update of CR of Addition of requirements on Data integrity in 5G |
CR revised to S1-210394 |
China Unicom | 22.261 18.1.1 CR#496 catB | DUMMY | Rel-18 |
S1-93-e AI: 4 |
revised | [WTS] [JSN] |
S1-210040 | WID Signal level Enhanced Network Selection | WID new | Deutsche Telekom, China Telecom, KDDI, KPN, Telecom Italia, IDEMIA, LG ELectronics, vivo Mobile |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210041 | CR Signal level Enhanced Network Selection | CR | Deutsche Telekom, China Telecom, KDDI, KPN, Telecom Italia, IDEMIA, LG Electronics, vivo Mobile | 22.011 17.3.0 CR#322 catB | DUMMY | Rel-18 |
S1-93-e AI: 4 |
noted | [WTS] [JSN] |
S1-210042 | Non-inclusive language replacement for GUP | CR | Deutsche Telekom AG | 22.24 16.0.0 CR#10 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
withdrawn | [WTS] [JSN] |
S1-210043 | FS_5TRS Editorial cleanup | pCR | Nokia, Nokia Shanghai Bell | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
agreed | [WTS] [JSN] |
S1-210044 | FS_5TRS Charging aspects |
pCR revised to S1-210432 |
Nokia, Nokia Shanghai Bell | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
revised | [WTS] [JSN] |
S1-210045 | FS_5TRS Security clean up |
pCR revised to S1-210433 |
Nokia, Nokia Shanghai Bell | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
revised | [WTS] [JSN] |
S1-210046 | FS_5TRS Consolidation of potential requirements and KPIs |
pCR revised to S1-210434 |
Nokia, Nokia Shanghai Bell | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
revised | [WTS] [JSN] |
S1-210047 | FS_5TRS Conclusion |
pCR revised to S1-210435 |
Nokia, Nokia Shanghai Bell | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
revised | [WTS] [JSN] |
S1-210048 | Presentation of Specification/Report to TSG: TR 22.878 Version 1.0.0 |
TS or TR cover revised to S1-210436 |
Nokia, Nokia Shanghai Bell | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
revised | [WTS] [JSN] | |
S1-210049 | New WID on 5G Timing Resiliency System (5TRS) |
WID new revised to S1-210361 |
Nokia, Nokia Shanghai Bell, AT&T, Deutsche Telekom, KDDi, KPN, LG Electronics, Inc, NextNav, NTT DoCoMo, Thales, Verizon UK Ltd |
S1-93-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-210050 | Relaying and backhauling data for network slice |
discussion revised to S1-210421 |
LG Electronics Inc. |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] | |||
S1-210051 | Editorial fix on TR22.835 v0.2.0 |
pCR revised to S1-210417 |
LG Electronics Inc. | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-210052 | new WID on Enhanced Access to and Support of Network Slice (EASNS) |
WID new revised to S1-210362 |
LG Electronics Inc., Vivo, Tencent, LG Uplus, Futurewei, Nokia, Nokia Shanghai Bell, ETRI, OPPO, KT, Apple, AT&T, InterDigital, KDDI, KPN, Samsung |
S1-93-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-210053 | FS_EASNS conclusion | discussion | LG Electronics Inc. |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] | |||
S1-210054 | FS_EASNS Overview |
pCR revised to S1-210418 |
LG Electronics Inc. | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-210055 | FS_EASNS consolidation |
discussion revised to S1-210425 |
LG Electronics Inc. |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] | |||
S1-210056 | FS_PALS update of section |
discussion revised to S1-210500 |
LG Electronics Inc. |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] | |||
S1-210057 | FS_AMMT – New use case- Distributed learning based on model parallelism | pCR | OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210058 | Distributed ML using D2D communication | pCR | OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210059 | Proposal for consolidated potential requirements in FS_AMMT | pCR | OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210060 | Update to AMMT use case - flocking |
pCR revised to S1-210391 |
OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210061 | Update to AMMT use case - Session-specific model transfer split computation decision operation |
pCR revised to S1-210378 |
OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210062 | Enhancement of “Virtual coupling” use case |
discussion revised to S1-210430 |
KRRI |
S1-93-e AI: 7.7.1 |
revised | [WTS] [JSN] | |||
S1-210063 | Update the figures in Clause 5.4, 5.5 and 5.6 with correct terminologies | pCR | Huawei, Hisilicon | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210064 | Update use case 5.2: Service restriction for visitor access scenario |
pCR revised to S1-210470 |
Huawei, Hisilicon, KPN | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210065 | Use case for Immersive Multi-modal Virtual Reality application |
pCR revised to S1-210520 |
Huawei, Hisilicon | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
revised | [WTS] [JSN] |
S1-210066 | New Use Case of User Level Granularity Multicast Service Access Control |
pCR revised to S1-210477 |
Huawei, Hisilicon | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210067 | New use case of service restriction for UE accessing to home network service via a hosting network | pCR | Huawei, Hisilicon | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
noted | [WTS] [JSN] |
S1-210068 | New WID on Energy Efficient High Precision Positioning for industrial IoT scenarios (EEHPP) |
WID new revised to S1-210365 |
Huawei |
S1-93-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-210069 | CR22.104_Adding energy efficiency requirements for positioning | CR | Huawei, Nokia, Nokia Shanghai Bell, Sony | 22.104 17.4.0 CR#62 catB | DUMMY | Rel-18 |
S1-93-e AI: 4 |
noted | [WTS] [JSN] |
S1-210070 | Clarify the KPI table in section 5.2 |
pCR revised to S1-210438 |
CEPRI, ZTE Corporation, China Telecom | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210071 | Update to Distributed Feeder Automation use case |
pCR revised to S1-210437 |
CEPRI, ZTE Corporation, China Telecom | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210072 | Update to 5.8 Smart Distribution Transformer Terminal |
pCR revised to S1-210441 |
CEPRI, ZTE Corporation, China Telecom | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210073 | clean up definition |
pCR revised to S1-210457 |
ZTE Corporation, Xiaomi | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210074 | UC of power efficient ranging operation |
pCR revised to S1-210460 |
ZTE Corporation, Xiaomi | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210075 | UC of Group UE’s service continuity |
pCR revised to S1-210510 |
ZTE Corporation, Qualcomm | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
revised | [WTS] [JSN] |
S1-210076 | Local traffic offload via mobile BS relays | pCR | ZTE Corporation | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
noted | [WTS] [JSN] |
S1-210077 | CR22.261 Clarification of energy efficiency requirements for positioning | CR | Huawei, Nokia, Nokia Shanghai Bell, Sony | 22.261 18.1.1 CR#497 catD | DUMMY | Rel-18 |
S1-93-e AI: 4 |
noted | [WTS] [JSN] |
S1-210078 | FS_PIN: Resolving Editor's Notes on the Use Case UE accessing PIN applications hosted by gateways |
pCR revised to S1-210493 |
InterDigital | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210079 | FS_PALS: Update to the Use Case Hosting network deployment for a temporary event |
pCR revised to S1-210505 |
InterDigital | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] |
S1-210080 | Remove non-inclusive language | CR | China Mobile Com. Corporation | 22.942 16.0.0 CR#2 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
noted | [WTS] [JSN] |
S1-210081 | pCR TR 22.847 Add skeleton |
pCR revised to S1-210517 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
revised | [WTS] [JSN] |
S1-210082 | pCR TR 22.847 Add scope |
pCR revised to S1-210518 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
revised | [WTS] [JSN] |
S1-210083 | pCR TR 22.847 Add overview |
pCR revised to S1-210519 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
revised | [WTS] [JSN] |
S1-210084 | FS_TACMM Use case: Remote control robot |
pCR revised to S1-210521 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
revised | [WTS] [JSN] |
S1-210085 | FS_TACMM Use case: Immersive VR games |
pCR revised to S1-210522 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
revised | [WTS] [JSN] |
S1-210086 | Revised SID on Study on supporting tactile and multi-modality communication services | SID revised | China Mobile Com. Corporation | FS_TACMM | Rel-18 |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] | |
S1-210087 | Use case on “Distributed Energy Resources and Micro-Grids” |
pCR revised to S1-210446 |
Huawei Technologies Sweden AB | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210088 | Non-inclusive language replacement 22.104 | CR | Siemens, BBC, EBU | 22.104 17.4.0 CR#63 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
agreed | [WTS] [JSN] |
S1-210089 | Non-inclusive language replacement 22.832 | CR | Siemens | 22.832 17.3.0 CR#31 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
agreed | [WTS] [JSN] |
S1-210090 | Reply LS on extraterritorial use of MCC for satellite access | LS out | TNO, Thales |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210091 | Reply LS on selecting a PLMN not allowed in the country where a UE is physically located | LS out | TNO, Thales |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210092 | Revised WID on Guidelines for Extra-territorial 5G Systems (FS_5GET) |
WID revised revised to S1-210392 |
TNO, Thales | FS_5GET | Rel-18 |
S1-93-e AI: 4 |
revised | [WTS] [JSN] | |
S1-210093 | Clarification to KPIs for a 5G system with satellite access |
draftCR revised to S1-210393 |
THALES | TEI17 | Rel-17 |
S1-93-e AI: 6.1 |
revised | [WTS] [JSN] | |
S1-210094 | Non-inclusive language replacement | CR | Apple | 22.259 16.0.0 CR#17 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
revised | [WTS] [JSN] |
S1-210095 | Update to the Use Case of supporting communication for the transmission of synchrophasors in wide-area smart grid |
pCR revised to S1-210445 |
Huawei Technologies France | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210096 | Use Case for Protection of interconnection between renewable and utility grid |
pCR revised to S1-210447 |
Huawei Technologies France | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210097 | Use Case of Utility Service Operator M2M service management platform in Smart Energy |
pCR revised to S1-210448 |
Huawei Technologies France | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210098 | Non-inclusive language replacement | CR | Apple | 22.259 16.0.0 CR#171 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
noted | [WTS] [JSN] |
S1-210099 | Correction of reference to “Master Operator” and use of “Hosting E-UTRAN Operator” |
CR revised to S1-210395 |
Huawei, HiSilicon | 22.101 17.2.0 CR#571 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
revised | [WTS] [JSN] |
S1-210100 | Correction of reference to “Master Operator” and use of “Hosting E-UTRAN Operator” | CR | Huawei, HiSilicon | 22.101 18.0.0 CR#572 catA | TEI17 | Rel-18 |
S1-93-e AI: 5 |
agreed | [WTS] [JSN] |
S1-210101 | Discussion related to incoming LS on extraterritorial use of MCC for satellite access | discussion | Huawei, HiSilicon |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210102 | Reply LS on extraterritorial use of MCC for satellite access | LS out | Huawei, HiSilicon | 5GSAT_ARCH-CT | Rel-17 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |
S1-210103 | FS_MMTELin5G Additional considerations | pCR | China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
noted | [WTS] [JSN] |
S1-210104 | FS_MMTELin5G Delete a requirement for use case on Conference call with AR holography |
pCR revised to S1-210370 |
China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
revised | [WTS] [JSN] |
S1-210105 | FS_MMTELin5G Use case on real-time visual interactive menu | pCR | China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
revised | [WTS] [JSN] |
S1-210106 | FS_MMTELin5G Abbreviations | pCR | China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
agreed | [WTS] [JSN] |
S1-210107 | FS_MMTELin5G Consolidated potential requirements | pCR | China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
noted | [WTS] [JSN] |
S1-210108 | FS_MMTELin5G Overview |
pCR revised to S1-210408 |
China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
revised | [WTS] [JSN] |
S1-210109 | FS_MMTELin5G References |
pCR revised to S1-210407 |
China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
revised | [WTS] [JSN] |
S1-210110 | 22262 Non-inclusive language replacement | CR | China Mobile Com. Corporation | 22.262 16.0.0 CR#1 catD | MSGin5G | Rel-17 |
S1-93-e AI: 5 |
noted | [WTS] [JSN] |
S1-210111 | Centralized RAN Information for Smart Energy Management | discussion | Samsung Electronics GmbH |
S1-93-e AI: 7.9.1 |
noted | [WTS] [JSN] | |||
S1-210112 | 22.867 P-CR: Bulk Operations for deploying UEs for Smart Energy Use Case | pCR | Samsung Electronics GmbH | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
noted | [WTS] [JSN] |
S1-210113 | P-CR 22.267 clause 5.5 – update KPIs and requirements |
pCR revised to S1-210439 |
Samsung Electronics GmbH | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210114 | P-CR 22.267 clause 5.7 – update KPIs and requirements |
pCR revised to S1-210440 |
Samsung, EUTC | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210115 | P-CR 22.267 clause 5.11 – QoS Reporting Requirement Update |
pCR revised to S1-210443 |
Samsung, EUTC | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210116 | 22.876 P-CR: Coordination for Energy Recovery Use Case |
pCR revised to S1-210449 |
Samsung, EUTC | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210117 | 22.926 P-CR: Airspace Update | pCR | Samsung | 22.926 0.2.0 | FS_5GET | Rel-18 |
S1-93-e AI: 7.5.1 |
agreed | [WTS] [JSN] |
S1-210118 | 22.926 P-CR: Extra-territorial Areas |
pCR revised to S1-210413 |
Samsung | 22.926 0.2.0 | FS_5GET | Rel-18 |
S1-93-e AI: 7.5.1 |
revised | [WTS] [JSN] |
S1-210119 | 22.926 P-CR: Communication Regulation In Vessels |
pCR revised to S1-210414 |
Samsung | 22.926 0.2.0 | FS_5GET | Rel-18 |
S1-93-e AI: 7.5.1 |
revised | [WTS] [JSN] |
S1-210120 | Use case of home service provider dynamically steering UEs between different PALS service networks |
pCR revised to S1-210506 |
Futurewei, Philips | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] |
S1-210121 | New Use case for FS_PIN: dynamic creation of an on-demand 5G PIN Non-Public-network at home |
pCR revised to S1-210496 |
Futurewei, Philips | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210122 | FS_AMMT – Including device-to-device aspects in the use case for Split Image Recognition | pCR | InterDigital, OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210123 | Definition of customer premises network |
pCR revised to S1-210469 |
KPN N.V. | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210124 | Modification of requirements for network slice constraints |
CR revised to S1-210404 |
ETRI | 22.261 16.13.0 CR#498 catF | TEI16 | Rel-16 |
S1-93-e AI: 6.3 |
revised | [WTS] [JSN] |
S1-210125 | Modification of requirements for network slice constraints |
CR revised to S1-210405 |
ETRI | 22.261 17.5.0 CR#499 catA | TEI16 | Rel-17 |
S1-93-e AI: 6.3 |
revised | [WTS] [JSN] |
S1-210126 | Use Case on Steering a UE between networks for Localized Service | pCR | Alibaba Group | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
merged | [WTS] [JSN] |
S1-210127 | Use case on network selection based on application for Localized Service |
pCR revised to S1-210507 |
Alibaba Group | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] |
S1-210128 | Editorial change on use case finding pets in a long distance | pCR | Huawei, Hisilicon | 22.855 0.2.0 | FS_MMTELin5G, FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
withdrawn | [WTS] [JSN] |
S1-210129 | Editorial change on use case finding pets in a long distance | pCR | Huawei, Hisilicon | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210130 | New use case: Immersive sound based on coordinated ranging |
pCR revised to S1-210461 |
Huawei, Hisilicon | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210131 | FS_EASNS new use case: UE's usage setting update | pCR | NTT DOCOMO INC. | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
noted | [WTS] [JSN] |
S1-210132 | 22.844 P-CR: Broadcast and Multicast Local Service Use Case |
pCR revised to S1-210508 |
Samsung Electronics GmbH | 22.844 0.1.1 | FS_VMR, FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] |
S1-210133 | Modification of requirements for network slice constraints |
CR revised to S1-210406 |
ETRI | 22.261 18.1.1 CR#500 catA | TEI16 | Rel-18 |
S1-93-e AI: 6.3 |
revised | [WTS] [JSN] |
S1-210134 | 22.844 P-CR: Proximate Resources Use Case | pCR | Samsung Electronics GmbH | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210135 | 22.839 P-CR: Transient Coverage Extension Use Case | pCR | Samsung Electronics GmbH | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] |
S1-210136 | 22.839 P-CR: Non-terrestrial coverage for Mobile Vehicular Relays Use Case | pCR | Samsung, FirstNet | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] |
S1-210137 | 22.859 P-CR: 5.3 Requirements update |
pCR revised to S1-210492 |
Samsung Electronics GmbH | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210138 | 22.855 P-CR: Object Finding and Tracking Use Case |
pCR revised to S1-210462 |
Samsung Electronics GmbH | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210139 | Updated SA1 ToR, using new template |
ToR revised to S1-210524 |
Samsung Electronics GmbH |
S1-93-e AI: 8 |
revised | [WTS] [JSN] | |||
S1-210140 | New use case: Supporting PIoT Aggregation Services | pCR | Lenovo, Motorola Mobility, Vivo, Broadcom | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
noted | [WTS] [JSN] |
S1-210141 | Update to use case on real-time screen sharing during a call |
pCR revised to S1-210371 |
Huawei Technologies Sweden AB | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
revised | [WTS] [JSN] |
S1-210142 | FS_MMTELin5G Use case on real-time visual interactive menu | pCR | China Mobile, Huawei, Deutsche Telekom | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
noted | [WTS] [JSN] |
S1-210143 | Consolidated KPI for FS_AMMT |
pCR revised to S1-210411 |
OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210144 | updated AMMT use case - Uncompressed Federated Learning for image recognition |
pCR revised to S1-210386 |
OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210145 | updated Ranging use case - Touchless self-checkout machine control |
pCR revised to S1-210458 |
OPPO | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210146 | Use case on Multimedia CLIP and COLP |
pCR revised to S1-210372 |
Huawei, China Mobile, Deutsche Telekom, Vodafone | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
revised | [WTS] [JSN] |
S1-210147 | Updates to Multiple working modes of vehicle mounted base station |
pCR revised to S1-210509 |
CATT | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
revised | [WTS] [JSN] |
S1-210148 | Use case on 3rd party specific user identities |
pCR revised to S1-210373 |
Huawei, China Mobile, Vodafone | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
revised | [WTS] [JSN] |
S1-210149 | Discussion on satellite backhaul | discussion | CATT |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210150 | New WID on 5G system with satellite backhaul (5GSATB) | WID new | CATT,China Telecom |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210151 | Requirements for satellite backhaul | CR | CATT,China Telecom | 22.261 18.1.1 CR#501 catB | DUMMY | Rel-18 |
S1-93-e AI: 4 |
noted | [WTS] [JSN] |
S1-210152 | Use case on the connection of 5G LAN with fixed IP VPN |
pCR revised to S1-210478 |
China Telecom Corporation Ltd. | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210153 | Review of new requirements identified by 22.867 for 5.2 Use case of advanced metering | pCR | Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210154 | Review of new requirements identified by 22.867 for 5.3. Use case of Distributed Feeder Automation | pCR | Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
merged | [WTS] [JSN] |
S1-210155 | Review of new requirements identified by 22.867 for 5.4 Use case of line current differential protection in power distribution grid | pCR | Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
noted | [WTS] [JSN] |
S1-210156 | Review of new requirements identified by 22.867 for 5.5 Smart Energy Differentiated QoS For Transported Encrypted Data | pCR | Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210157 | Review of new requirements identified by 22.867 for 5.8 Use case of Smart Distribution Transformer Terminal | pCR | Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
merged | [WTS] [JSN] |
S1-210158 | Review of new requirements identified by 22.867 for 5.9 Use case of isolation demand for energy applications |
pCR revised to S1-210442 |
Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210159 | Review of new requirements identified by 22.867 for 5.12.2 Distribution Intelligence – FLISR (Fault Location, Isolation, and Service Restoration) | pCR | Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210160 | Review of new requirements identified by 22.867 for 5.12.3 High speed current differential protection | pCR | Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210161 | Use case on applications using IEC 61850-9-2 sampled values |
pCR revised to S1-210450 |
Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210162 | WID on Smart Energy and Infrastructure |
WID new revised to S1-210364 |
China Telecomunication Corp. |
S1-93-e AI: 4 |
revised | [WTS] [JSN] | |||
S1-210163 | Presentation of Specification/Report to TSG: TR 22.867, Version 0.3.0 |
TS or TR cover revised to S1-210456 |
China Telecomunication Corp. | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] | |
S1-210164 | Use case – Incident response involving multiple countries | pCR | BDBOS | 22.881 0.3.0 | FS_SACI_MCS | Rel-18 |
S1-93-e AI: 7.2.1 |
agreed | [WTS] [JSN] |
S1-210165 | FS-VMR updates to explicitly include priority services (e.g., MPS) | pCR | Perspecta Labs, CISA ECD, Verizon, T-Mobile US, AT&T | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] |
S1-210166 | FS_SACI_MCS Updates for clarification | pCR | OTD | 22.881 0.3.0 | FS_SACI_MCS | Rel-18 |
S1-93-e AI: 7.2.1 |
agreed | [WTS] [JSN] |
S1-210167 | FS_MMTELin5G cleanup | pCR | Nokia, Nokia Shanghai Bell, Sony, LG Electronics | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
noted | [WTS] [JSN] |
S1-210168 | FS_EASN Additional requirement for use case | pCR | OTD | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
noted | [WTS] [JSN] |
S1-210169 | Adding energy efficiency use cases for positioning to the ANNEX A |
CR revised to S1-210366 |
Fraunhofer IIS | 22.104 17.4.0 CR#64 catB | DUMMY | Rel-18 |
S1-93-e AI: 4 |
revised | [WTS] [JSN] |
S1-210170 | FS_Resident Additional requirement for use case |
pCR revised to S1-210471 |
OTD | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210171 | Use Case of power distribution grid state estimation service |
pCR revised to S1-210451 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210172 | FS_PIN Additional requirement for use case | pCR | OTD | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
noted | [WTS] [JSN] |
S1-210173 | 22.858 terminology clean up | pCR | KPN N.V. | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210174 | Use Case of power distribution grid load and generation prediction service |
pCR revised to S1-210452 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210175 | Requirements for low power highly accurate positioning | discussion | Fraunhofer IIS | DUMMY | Rel-18 |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |
S1-210176 | Use Case of power distribution grid power control service |
pCR revised to S1-210453 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210177 | Use Case of ensuring uninterrupted MTC service availability during emergencies |
pCR revised to S1-210454 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210178 | Update of requirement for switching of user traffic | CR | Nokia, Nokia Shanghai Bell | 22.278 12.7.0 CR#282 catF | ProSe-SA1 | Rel-12 |
S1-93-e AI: 6.2 |
noted | [WTS] [JSN] |
S1-210179 | Update of requirement for switching of user traffic |
CR revised to S1-210399 |
Nokia, Nokia Shanghai Bell | 22.278 13.5.0 CR#283 catA | ProSe-SA1 | Rel-13 |
S1-93-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-210180 | Update of requirement for switching of user traffic |
CR revised to S1-210400 |
Nokia, Nokia Shanghai Bell | 22.278 14.5.0 CR#284 catA | ProSe-SA1 | Rel-14 |
S1-93-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-210181 | Update of requirement for switching of user traffic |
CR revised to S1-210401 |
Nokia, Nokia Shanghai Bell | 22.278 15.4.0 CR#285 catA | ProSe-SA1 | Rel-15 |
S1-93-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-210182 | Update of requirement for switching of user traffic |
CR revised to S1-210402 |
Nokia, Nokia Shanghai Bell | 22.278 16.2.0 CR#286 catA | ProSe-SA1 | Rel-16 |
S1-93-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-210183 | Update of requirement for switching of user traffic |
CR revised to S1-210369 |
Nokia, Nokia Shanghai Bell | 22.278 17.1.0 CR#287 catA | ProSe-SA1 | Rel-17 |
S1-93-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-210184 | Reply LS to SA6 (cc SA WG2, ACJA) on Clarification on problematic UAV |
LS out revised to S1-210359 |
Qualcomm Incorporated |
S1-93-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-210185 | Edge cloud driven data acquisition (edgePMU) |
pCR revised to S1-210455 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210186 | Reply LS on Credentials for SNPN service continuity | LS out | Qualcomm Incorporated |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210187 | Reply LS to CT1 (cc SA2, RAN2, SA3) on extra-territorial use of MCC for satellites |
LS out revised to S1-210358 |
Qualcomm Incorporated |
S1-93-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-210188 | New WI on PWS for NPN (NPN_PWS) | WID new | Qualcomm Incorporated |
S1-93-e AI: 6.1 |
noted | [WTS] [JSN] | |||
S1-210189 | Requirements for PWS over NPN | CR | Qualcomm Incorporated | 22.261 17.5.0 CR#502 catB | DUMMY | Rel-17 |
S1-93-e AI: 6.1 |
noted | [WTS] [JSN] |
S1-210190 | Ranging-use case update-enable disable ranging and ranging interval |
pCR revised to S1-210459 |
Xiaomi Communications | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210191 | LS to SA2, CT1, RAN2, RAN3, SA, CT, RAN (cc SA3) on [DRAFT] LS on support of PWS over SNPN |
LS out revised to S1-210368 |
Qualcomm [SA1] |
S1-93-e AI: 6.1 |
revised | [WTS] [JSN] | |||
S1-210192 | Ranging-use cases new-remote Access Right authorization |
pCR revised to S1-210465 |
Xiaomi Communications | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210193 | Update to In venue registration use case |
pCR revised to S1-210504 |
Qualcomm Incorporated | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] |
S1-210194 | Update to Discovery and access use case |
pCR revised to S1-210503 |
Qualcomm Incorporated | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] |
S1-210195 | Use case on mobile relays sharing |
pCR revised to S1-210511 |
Qualcomm Incorporated | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
revised | [WTS] [JSN] |
S1-210196 | Ranging-use cases new-Sharing content to a particular UE |
pCR revised to S1-210466 |
Xiaomi Communications | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210197 | Use case on relay-macro simultaneous connectivity |
pCR revised to S1-210512 |
Qualcomm Incorporated | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
revised | [WTS] [JSN] |
S1-210198 | Use case on managing UEs inside the vehicle |
pCR revised to S1-210513 |
Qualcomm Incorporated | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
revised | [WTS] [JSN] |
S1-210199 | UE Status Information | discussion | Samsung Electronics GmbH |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] | |||
S1-210200 | Use case on AI-ML for Smart Automotive systems |
pCR revised to S1-210409 |
Qualcomm Incorporated | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210201 | Updates and clarifications on KPIs | pCR | Qualcomm Incorporated | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210202 | Updates and clarifications on Functional requirements | pCR | Qualcomm Incorporated | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210203 | TACMM-use case new-Multi-modality Gaming System | pCR | Xiaomi Communications | 22.847 0.1.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
withdrawn | [WTS] [JSN] |
S1-210204 | TACMM-use case new-Multi-modality Gaming System | pCR | Xiaomi Communications | 22.847 0.1.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
noted | [WTS] [JSN] |
S1-210205 | 5G system with High Altitude Platform Station (HAPS) | WID new | China Unicom |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210206 | Gateway MCX UE identification |
CR revised to S1-210398 |
BDBOS, FirstNet, UIC | 22.28 17.4.0 CR#144 catB | TEI17 | Rel-17 |
S1-93-e AI: 6.1 |
revised | [WTS] [JSN] |
S1-210207 | KPI for 5G system with HAPS | CR | China Unicom, China Telecom, CITC | 22.261 18.1.1 CR#503 catB | DUMMY | Rel-18 |
S1-93-e AI: 4 |
noted | [WTS] [JSN] |
S1-210208 | SIPTO Support for 5G Systems (SIPTOin5GS) | WID new | Reliance Jio |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210209 | Use case on shared AI/ML model monitoring |
pCR revised to S1-210410 |
Nokia Shanghai Bell | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210210 | Use case updates – clause 5 | pCR | Nokia Shanghai Bell | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210211 | Use case updates – clause 6 | pCR | Nokia Shanghai Bell | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210212 | Smart Grid_Update to sec 5.13 | pCR | Qualcomm Incorporated | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210213 | Use case updates – clause 7 | pCR | Nokia Shanghai Bell | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210214 | FS_AMMT - editorials |
pCR revised to S1-210374 |
Nokia Shanghai Bell | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210215 | Smart Grid_clarifications to requirements |
pCR revised to S1-210444 |
Qualcomm Incorporated | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
revised | [WTS] [JSN] |
S1-210216 | Time Resiliency_Updates and clarifications |
pCR revised to S1-210431 |
Qualcomm Incorporated | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
revised | [WTS] [JSN] |
S1-210217 | NW slice_Updates and clarifications |
pCR revised to S1-210420 |
Qualcomm Incorporated | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-210218 | Align TR with SA1 drafting rules on Inclusive Language |
CR revised to S1-210396 |
Union Inter. Chemins de Fer | 22.889 17.3.0 CR#170 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
revised | [WTS] [JSN] |
S1-210219 | Off-Net Railways_Update to sec.8 |
pCR revised to S1-210428 |
Qualcomm Incorporated | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-210220 | Clarification of 'access' for simultaneous access to multiple slices on different VPLMNs |
pCR revised to S1-210422 |
Apple | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-210221 | New use case: Loss of connectivity between eRG or PRAS and 5GC |
pCR revised to S1-210479 |
Apple | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210222 | Control of Customer Premises Network by Authorised Administrator |
pCR revised to S1-210480 |
KPN N.V. | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210223 | Definition for PALS | pCR | Intel | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
noted | [WTS] [JSN] |
S1-210224 | Interworking scenarios for PALS |
pCR revised to S1-210499 |
Intel | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] |
S1-210225 | Updates of Use case 5.3 for accessing home network service via PALS network |
pCR revised to S1-210501 |
Intel | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] |
S1-210226 | Align TR with SA1 drafting rules on Inclusive Language |
CR revised to S1-210397 |
Union Inter. Chemins de Fer | 22.989 18.0.0 CR#1 catD | FS_eFRMCS | Rel-18 |
S1-93-e AI: 5 |
revised | [WTS] [JSN] |
S1-210227 | Updates of Use case 5.4 for on demand PALS services |
pCR revised to S1-210502 |
Intel | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
revised | [WTS] [JSN] |
S1-210228 | Enhance “Train ready for departure communication” use case with video | pCR | Union Inter. Chemins de Fer | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-210229 | Enable support for user centric identifiers and authentication in PIN and Residential | pCR | Intel | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
noted | [WTS] [JSN] |
S1-210230 | Enhance “Shunting communication” use case with video | pCR | Union Inter. Chemins de Fer | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-210231 | Update Use case 5.11 for UE security and privacy |
pCR revised to S1-210473 |
Intel | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210232 | RAILSS introduction | pCR | Hansung University | 22.89 0.3.0 | FS_RAILSS | Rel-17 |
S1-93-e AI: 7.3.1 |
agreed | [WTS] [JSN] |
S1-210233 | New “Monitoring and Control of Critical Infrastructure communication” use case |
pCR revised to S1-210427 |
Union Inter. Chemins de Fer | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-210234 | RAILSS scope | pCR | Hansung University | 22.89 0.3.0 | FS_RAILSS | Rel-17 |
S1-93-e AI: 7.3.1 |
agreed | [WTS] [JSN] |
S1-210235 | Add “MCX Support” as an identified issue to be solved by 3GPP technology as required by Off-Network for Rail |
pCR revised to S1-210429 |
Union Inter. Chemins de Fer | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
revised | [WTS] [JSN] |
S1-210236 | Enable support for user centric identifiers and authentication in Residential |
pCR revised to S1-210481 |
Intel | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210237 | FS_PIN: New Use case: PIN enhanced “New use case on Local control of PRASs connectivity for UEs access to a device in a CPN” | pCR | vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
noted | [WTS] [JSN] |
S1-210238 | FS_PIN: Definition update |
pCR revised to S1-210486 |
vivo Mobile Com. (Chongqing), InterDigital, Intel | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210239 | FS_PIN: Definition update – PIN Element |
pCR revised to S1-210487 |
vivo Mobile Com. (Chongqing), InterDigital | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210240 | Do not exclude any single or a combination of 3GPP capabilities to support Rail Off-Network use cases | pCR | Union Inter. Chemins de Fer | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-210241 | FS_PIN: Use case update: “inhome” – add coverage / connectivity requirements |
pCR revised to S1-210490 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210242 | FS_PIN: Use case update: The Tour Guide |
pCR revised to S1-210494 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210243 | FS_PIN: Considerations |
pCR revised to S1-210489 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210244 | Request for clarification on relationship between TR 22.990 and TS 22.289 QoS scenarios and traffic characteristics | pCR | Union Inter. Chemins de Fer | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-210245 | FS_PIN: Use case update – Positioning with VR and AR |
pCR revised to S1-210491 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210246 | FS_PIN: New use case: Smart Dog Collar |
pCR revised to S1-210497 |
vivo Mobile Com. (Chongqing), Intel | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210247 | Presentation of Specification/Report to TSG: TR 22.859, Version 1.0.0 |
TS or TR cover revised to S1-210498 |
vivo Mobile Com. (Chongqing) | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] | |
S1-210248 | New WID on Service requirements for Network of Networks (NETNET) | WID new | vivo Mobile Com. (Chongqing), KPN, Convida Wireless, Huawei, Huawei Devices, Intel, InterDigital, LG Electronics |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210249 | Changes to Critical Support Applications “Inviting-a-FRMCS User to a voice communication” use case |
CR revised to S1-210515 |
UIC | 22.989 18.0.0 CR#2 catC | FS_eFRMCS | Rel-18 |
S1-93-e AI: 7.15.1 |
revised | [WTS] [JSN] |
S1-210250 | Merging of Railway Emergency Communications |
CR revised to S1-210516 |
UIC | 22.989 18.0.0 CR#3 catC | FS_eFRMCS | Rel-18 |
S1-93-e AI: 7.15.1 |
revised | [WTS] [JSN] |
S1-210251 | update to use case AI/ML model distribution for image recognition |
pCR revised to S1-210379 |
vivo Mobile Com. (Chongqing) | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210252 | Use case:eRG supporting Multiple connectivity |
pCR revised to S1-210482 |
vivo Mobile Com. (Chongqing) | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210253 | Update of use case 5.8 support of broadcast-based service discovery |
pCR revised to S1-210495 |
KPN N.V. | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210254 | FS_RESIDENT: update of use case 5.10 | pCR | Nokia, Nokia Shanghai Bell | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
merged | [WTS] [JSN] |
S1-210255 | FS_RESIDENT: new use case on untethering | pCR | Nokia, Nokia Shanghai Bell | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
noted | [WTS] [JSN] |
S1-210256 | Discussion on 5G system with HAPS | discussion | China Unicom |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210257 | FS_VMR: use case on Optimizing mobility for UEs from planned or predicted mobility information |
pCR revised to S1-210514 |
InterDigital | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
revised | [WTS] [JSN] |
S1-210258 | FS_Resident: Use case on enabling minimum user interaction for a mobile evolved residential gateway |
pCR revised to S1-210483 |
InterDigital | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210259 | Clean-up_alignment of R16 UAS requirements |
CR revised to S1-210403 |
Qualcomm Incorporated | 22.125 16.3.0 CR#33 catF | ID_UAS | Rel-16 |
S1-93-e AI: 6.2 |
revised | [WTS] [JSN] |
S1-210260 | FS_Resident: Use case on seamless and low latency access for a remote UE in residential network |
pCR revised to S1-210484 |
InterDigital | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] |
S1-210261 | Shared use of credentials | pCR | KPN N.V. | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
noted | [WTS] [JSN] |
S1-210262 | Progress of LS-reply to SA6 on FS_UASAPP | discussion | InterDigital |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210263 | Reply LS on clarification on provisioning of UAV location information | LS out | InterDigital |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210264 | Use case for operation of screen doors | pCR | Hansung University, ETRI, KT, LGUplus | 22.89 0.3.0 | FS_RAILSS | Rel-17 |
S1-93-e AI: 7.3.1 |
noted | [WTS] [JSN] |
S1-210265 | Support of Skillset Sharing for Cooperative Automated Driving |
pCR revised to S1-210523 |
LG Electronics Deutschland | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
revised | [WTS] [JSN] |
S1-210266 | Update for Data Transfer Disturbance in Multi-agent multi-device ML Operations |
pCR revised to S1-210389 |
LG Electronics Deutschland | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210267 | Editorial Update for Compressed Federated Learning for image/video processing | pCR | LG Electronics Deutschland | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210268 | FS_PIN: Overview update – add diagrams |
pCR revised to S1-210488 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210269 | Network selection with extra territoriality |
pCR revised to S1-210415 |
TNO | 22.926 0.2.0 | FS_5GET | Rel-18 |
S1-93-e AI: 7.5.1 |
revised | [WTS] [JSN] |
S1-210270 | Clarification of problematic UAV |
CR revised to S1-210360 |
Deutsche Telekom AG | 22.125 17.2.0 CR#34 catF | ID_UAS | Rel-17 |
S1-93-e AI: 3 |
revised | [WTS] [JSN] |
S1-210271 | New use case on clustering of devices |
pCR revised to S1-210463 |
Philips International B.V. | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210272 | New use case on tracking of device position |
pCR revised to S1-210464 |
Philips International B.V. | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
revised | [WTS] [JSN] |
S1-210273 | New use case on inviting mobile device to a specific network slicePALS network | pCR | Philips International B.V. | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
withdrawn | [WTS] [JSN] |
S1-210274 | New use case on inviting mobile device to a PALS network | pCR | Philips International B.V. | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
noted | [WTS] [JSN] |
S1-210275 | New use case on onboarding temporary base station devices | pCR | Philips International B.V. | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
noted | [WTS] [JSN] |
S1-210276 | FS_EASNS Update of potential new requirements in use case 5.5 |
pCR revised to S1-210424 |
ETRI | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-210277 | FS_EASNS: References |
pCR revised to S1-210416 |
ETRI | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] |
S1-210278 | Timer for periodic network selection attempts in satellite access | LS in | C1-207766 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210279 | LS on selecting a PLMN not allowed in the country where a UE is physically located | LS in | C1-210437 |
S1-93-e AI: 3 |
postponed | [WTS] [JSN] | |||
S1-210280 | LS on extraterritorial use of MCC for satellite access | LS in | C1-210439 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210281 | Reply LS on Use of Survival Time for Deterministic Applications in 5GS | LS in | R2-2010838 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210282 | Reply LS on Sufficiency of Survival Time | LS in | R2-2102088 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210283 | Clarification request for eNPN features | LS in | R2-2102489 |
S1-93-e AI: 3 |
postponed | [WTS] [JSN] | |||
S1-210284 | Reply LS on Use of Survival Time for Deterministic Applications in 5GS | LS in | R3-207211 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210285 | LS on Clarification on problematic UAV | LS in | S6-202227 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210286 | LS on Use of Inclusive Language in 3GPP | LS in | SP-201143 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210287 | LS on credentials for SNPN service continuity | LS in | S1-204282/S2-2007828 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210288 | LS on Clarification on problematic UAV | LS in | S1-204325/S6-202227 |
S1-93-e AI: 3 |
withdrawn | [WTS] [JSN] | |||
S1-210289 | Reply LS on request for information from IALA | LS in | S1-204286/SP-200877 |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210290 | Non-inclusive language replacement | CR | KPN | 22.173 17.2.0 CR#132 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
agreed | [WTS] [JSN] |
S1-210291 | LS to CT1 (cc RAN2, CT6) on Timer for periodic network selection attempts in satellite access |
LS out LS To: CT1 revised to S1-210357 |
Oppo |
S1-93-e AI: 3 |
revised | [WTS] [JSN] | |||
S1-210292 | Reply LS on extraterritorial use of MCC for satellite access |
LS out LS To: CT1 |
Huawei, HiSilicon |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210293 | [DRAFT] Reply LS to RAN2, SA2 (cc RAN3, CT1, SA1) on clarification request for eNPN features |
LS out LS To: RAN2, SA2 |
Deutsche Telekom |
S1-93-e AI: 3 |
noted | [WTS] [JSN] | |||
S1-210294 | Clarifications on PIN & Resident terminology | discussion | vivo Mobile Communications Co. LTD |
S1-93-e AI: 7.12.1 |
noted | [WTS] [JSN] | |||
S1-210295 | Slides on Resident terminology | discussion | TNO |
S1-93-e AI: 7.11.1 |
noted | [WTS] [JSN] | |||
S1-210296 | Way forward of the WI EEHPP | discussion | Huawei |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210297 | Non-inclusive language replacement | CR | ETSI MCC | 22.826 17.1.0 CR#6 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
agreed | [WTS] [JSN] |
S1-210298 | Non-inclusive language replacement | CR | ETSI MCC | 22.827 17.1.0 CR#2 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
agreed | [WTS] [JSN] |
S1-210299 | Not allocated | other | Withdrawn |
S1-93-e AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-210300 | TR22.873 v0.5.0 to include agreements at this meeting | draft TR | Rapporteur (China Mobile) | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
agreed | [WTS] [JSN] | |
S1-210301 | TR22.881 v0.4.0 to include agreements at this meeting | draft TR | Rapporteur (China Mobile) | FS_SACI_MCS | Rel-18 |
S1-93-e AI: 7.1.1 |
agreed | [WTS] [JSN] | |
S1-210302 | TR22.890 v0.4.0 to include agreements at this meeting | draft TR | Rapporteur (Hansung University) | FS_RAILSS | Rel-17 |
S1-93-e AI: 7.3.1 |
agreed | [WTS] [JSN] | |
S1-210303 | TR22.874v0.3.0 to include agreements at this meeting | draft TR | Rapporteur (OPPO) | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] | |
S1-210304 | Cover page for presentation/approval of TR22.874v0.3.0 |
TS or TR cover revised to S1-210412 |
Rapporteur (OPPO) | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] | |
S1-210305 | TR22.926v0.3.0 to include agreements at this meeting | draft TR | Rapporteur (TNO) | FS_5GET | Rel-18 |
S1-93-e AI: 7.5.1 |
agreed | [WTS] [JSN] | |
S1-210306 | TR22.835v0.3.0 to include agreements at this meeting | draft TR | Rapporteur (LG Electronics) | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] | |
S1-210307 | Cover page for presentation of TR22.835v0.3.0 |
TS or TR cover revised to S1-210426 |
Rapporteur (LG Electronics) | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
revised | [WTS] [JSN] | |
S1-210308 | TR22.990v0.3.0 to include agreements at this meeting | draft TR | Rapporteur (UIC) | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
agreed | [WTS] [JSN] | |
S1-210309 | TR22.878v0.3.0 to include agreements at this meeting | draft TR | Rapporteur (Nokia) | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
agreed | [WTS] [JSN] | |
S1-210310 | TR22.867v0.3.0 to include agreements at this meeting | draft TR | Rapporteur (China Telecom) | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] | |
S1-210311 | TR22.855v0.3.0 to include agreements at this meeting | draft TR | Rapporteur (Xiaomi) | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] | |
S1-210312 | Cover page for presentation of TR22.855v0.3.0 |
TS or TR cover revised to S1-210485 |
Rapporteur (KPN) | FS_Ranging | Rel-18 |
S1-93-e AI: 7.11.1 |
revised | [WTS] [JSN] | |
S1-210313 | TR22.858v0.3.0 to include agreements at this meeting | draft TR | Rapporteur (KPN) | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] | |
S1-210314 | TR22.859 v0.3.0 to include agreements at this meeting | draft TR | Rapporteur (vivo) | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] | |
S1-210315 | TR22.844 v0.2.0 to include agreements at this meeting | draft TR | Rapporteur (Qualcomm) | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] | |
S1-210316 | TR22.839 v0.2.0 to include agreements at this meeting | draft TR | Rapporteur (Qualcomm) | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] | |
S1-210317 | TR22.847 v0.1.0 to include agreements at this meeting | draft TR | Rapporteur (China Mobile) | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
agreed | [WTS] [JSN] | |
S1-210318 | Non-inclusive language replacement | CR | SK Telecom | 22.183 16.0.0 CR#3 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
noted | [WTS] [JSN] |
S1-210319 | Use case updates – clause 5.1 |
pCR revised to S1-210375 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210320 | Use case updates – clause 5.2 |
pCR revised to S1-210376 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210321 | Use case updates – clause 5.3 | pCR | Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210322 | Use case updates – clause 5.4 |
pCR revised to S1-210377 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210323 | Use case updates – clause 5.5 | pCR | Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
merged | [WTS] [JSN] |
S1-210324 | Use case updates – clause 6.1 |
pCR revised to S1-210380 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210325 | Use case updates – clause 6.2 |
pCR revised to S1-210382 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210326 | Use case updates – clause 6.3 |
pCR revised to S1-210384 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210327 | Use case updates – clause 7.1 |
pCR revised to S1-210387 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210328 | Use case updates – clause 7.2 |
pCR revised to S1-210388 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210329 | Use case updates – clause 7.3 |
pCR revised to S1-210390 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210330 | Updates on Functional requirements – Use case 5. 5 | pCR | Qualcomm | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210331 | Updates on Functional requirements – Use case 7.4 | pCR | Qualcomm | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210332 | Updates and clarifications on KPIs – Use case 5.1 | pCR | Qualcomm | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210333 | Updates and clarifications on KPIs – Use case 5.4 | pCR | Qualcomm | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210334 | Updates and clarifications on KPIs – Use case 6.1 | pCR | Qualcomm | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210335 | Updates and clarifications on KPIs – Use case 6.2 |
pCR revised to S1-210383 |
Qualcomm | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
revised | [WTS] [JSN] |
S1-210336 | Updates and clarifications on KPIs – Use case 6.3 | pCR | Qualcomm | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210337 | Updates and clarifications on KPIs – Use case 7.1 | pCR | Qualcomm | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210338 | Not allocated | other | Withdrawn |
S1-93-e AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-210339 | Not allocated | other | Withdrawn |
S1-93-e AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-210340 | FS_MMTELin5G – Status report | report | China Mobile |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210341 | FS_SACI_MCS – Status report | report | BDBOS |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210342 | FS_RAILSS – Status report | report | Hansung University |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210343 | FS_AMMT – Status report | report | OPPO |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210344 | FS_5GET– Status report | report | THALES |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210345 | FS_EASNS – Status report | report | LG Electronics |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210346 | FS_OffNetRail – Status report | report | UIC |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210347 | FS_5TRS – Status report | report | Nokia |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210348 | FS_5GSEI – Status report | report | China Telecom |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210349 | FS_Ranging – Status report | report | Xiaomi |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210350 | FS_Resident – Status report | report | KPN |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210351 | FS_PIN – Status report | report | Vivo |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210352 | FS_PALS – Status report | report | Qualcomm |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210353 | FS_VMR – Status report | report | Qualcomm |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210354 | FS_eFRMCS – Status report | report | UIC |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210355 | FS_TMMin5GS – Status report | report | China Mobile |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210356 | LS to SA2 on response to LS (S2-2007828) on credentials for SNPN service continuity |
LS out LS To: SA2 revision of S1-210035 |
Deutsche Telekom AG (SA1) |
S1-93-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-210357 | LS to CT1 (cc RAN2, CT6) on Timer for periodic network selection attempts in satellite access |
LS out LS To: CT1 revision of S1-210291 |
Oppo |
S1-93-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-210358 | Reply LS to CT1 (cc SA2, RAN2, SA3) on extra-territorial use of MCC for satellites |
LS out LS To: CT1 revision of S1-210187 |
Qualcomm Incorporated |
S1-93-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-210359 | Reply LS to SA6 (cc SA WG2, ACJA) on Clarification on problematic UAV |
LS out LS To: SA6 revision of S1-210184 |
Qualcomm Incorporated |
S1-93-e AI: 3 |
agreed | [WTS] [JSN] | |||
S1-210360 | Clarification of problematic UAV |
CR revision of S1-210270 |
Deutsche Telekom AG | 22.125 17.2.0 CR#341 catF | ID_UAS | Rel-17 |
S1-93-e AI: 3 |
agreed | [WTS] [JSN] |
S1-210361 | New WID on 5G Timing Resiliency System (5TRS) |
WID new revision of S1-210049 |
Nokia, Nokia Shanghai Bell, AT&T, Deutsche Telekom, KDDi, KPN, LG Electronics, Inc, NextNav, NTT DoCoMo, Thales, Verizon UK Ltd |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] | |||
S1-210362 | new WID on Enhanced Access to and Support of Network Slice (EASNS) |
WID new revision of S1-210052 |
LG Electronics Inc., Vivo, Tencent, LG Uplus, Futurewei, Nokia, Nokia Shanghai Bell, ETRI, OPPO, KT, Apple, AT&T, InterDigital, KDDI, KPN, Samsung |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] | |||
S1-210363 | Ranging-based service Requirements (Ranging) |
WID new revision of S1-210019 |
Beijing Xiaomi Mobile Software |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] | |||
S1-210364 | WID on Smart Energy and Infrastructure |
WID new revision of S1-210162 |
China Telecomunication Corp. |
S1-93-e AI: 4 |
noted | [WTS] [JSN] | |||
S1-210365 | New WID on Energy Efficient High Precision Positioning for industrial IoT scenarios (EEHPP) |
WID new revision of S1-210068 |
Huawei |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] | |||
S1-210366 | Adding energy efficiency use cases for positioning to the ANNEX A |
CR revision of S1-210169 |
Fraunhofer IIS | 22.104 17.4.0 CR#641 catB | REFEC | Rel-18 |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] |
S1-210367 | New WID on Data Integrity in 5G (DI_5G) |
WID new revision of S1-210037 |
China Unicom |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] | |||
S1-210368 | LS to SA2, CT1, RAN2, RAN3, SA, CT, RAN (cc SA3) on Support of PWS over SNPN |
LS out LS To: SA2, CT1, RAN2, RAN3, SA, CT, RAN LS reply in C1-212074, C1-212924, C1-213006, C1-213015, C1-213640, SP-210385 revision of S1-210191 |
SA1 |
S1-93-e AI: 6.1 |
agreed | [WTS] [JSN] | |||
S1-210369 | Update of requirement for switching of user traffic |
CR revision of S1-210183 |
Nokia, Nokia Shanghai Bell | 22.278 17.1.0 CR#2871 catA | ProSe-SA1 | Rel-17 |
S1-93-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-210370 | FS_MMTELin5G Delete a requirement for use case on Conference call with AR holography |
pCR revision of S1-210104 |
China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
agreed | [WTS] [JSN] |
S1-210371 | Update to use case on real-time screen sharing during a call |
pCR revision of S1-210141 |
Huawei Technologies Sweden AB | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
agreed | [WTS] [JSN] |
S1-210372 | Use case on Multimedia CLIP and COLP |
pCR revision of S1-210146 |
Huawei, China Mobile, Deutsche Telekom, Vodafone | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
agreed | [WTS] [JSN] |
S1-210373 | Use case on 3rd party specific user identities |
pCR revision of S1-210148 |
Huawei, China Mobile, Vodafone | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
agreed | [WTS] [JSN] |
S1-210374 | FS_AMMT - editorials |
pCR revision of S1-210214 |
Nokia Shanghai Bell | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210375 | Use case updates – clause 5.1 |
pCR revision of S1-210319 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210376 | Use case updates – clause 5.2 |
pCR revision of S1-210320 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210377 | Use case updates – clause 5.4 |
pCR revision of S1-210322 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210378 | Update to AMMT use case - Session-specific model transfer split computation decision operation |
pCR revision of S1-210061 |
OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210379 | update to use case AI/ML model distribution for image recognition |
pCR revision of S1-210251 |
vivo Mobile Com. (Chongqing) | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210380 | Use case updates – clause 6.1 |
pCR revision of S1-210324 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210381 | FS_AMMT: Removal of Editor's note from P.R.6.2-I-001 |
pCR revision of S1-210022 |
InterDigital | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210382 | Use case updates – clause 6.2 |
pCR revision of S1-210325 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210383 | Updates and clarifications on KPIs – Use case 6.2 |
pCR revision of S1-210335 |
Qualcomm | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210384 | Use case updates – clause 6.3 |
pCR revision of S1-210326 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210385 | FS_AMMT update to AI model management as a Service UC |
pCR revision of S1-210031 |
China Telecommunications | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210386 | updated AMMT use case - Uncompressed Federated Learning for image recognition |
pCR revision of S1-210144 |
OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
merged | [WTS] [JSN] |
S1-210387 | Use case updates – clause 7.1 |
pCR revision of S1-210327 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210388 | Use case updates – clause 7.2 |
pCR revision of S1-210328 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210389 | Update for Data Transfer Disturbance in Multi-agent multi-device ML Operations |
pCR revision of S1-210266 |
LG Electronics Deutschland | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210390 | Use case updates – clause 7.3 |
pCR revision of S1-210329 |
Nokia | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210391 | Update to AMMT use case - flocking |
pCR revision of S1-210060 |
OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210392 | Revised WID on Guidelines for Extra-territorial 5G Systems (FS_5GET) |
WID revised revision of S1-210092 |
TNO, Thales | FS_5GET | Rel-18 |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] | |
S1-210393 | Clarification to KPIs for a 5G system with satellite access |
CR revision of S1-210093 |
Thales | 22.261 18.1.1 CR#5041 catC | SCVS | Rel-18 |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] |
S1-210394 | update of CR of Addition of requirements on Data integrity in 5G |
CR revision of S1-210039 |
China Unicom | 22.261 18.1.1 CR#4961 catB | DI_5G | Rel-18 |
S1-93-e AI: 4 |
agreed | [WTS] [JSN] |
S1-210395 | Correction of reference to “Master Operator” and use of “Hosting E-UTRAN Operator” |
CR revision of S1-210099 |
Huawei, HiSilicon | 22.101 17.2.0 CR#5711 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
agreed | [WTS] [JSN] |
S1-210396 | Align TR with SA1 drafting rules on Inclusive Language |
CR revision of S1-210218 |
Union Inter. Chemins de Fer | 22.889 17.3.0 CR#1701 catD | TEI17 | Rel-17 |
S1-93-e AI: 5 |
agreed | [WTS] [JSN] |
S1-210397 | Align TR with SA1 drafting rules on Inclusive Language |
CR revision of S1-210226 |
Union Inter. Chemins de Fer | 22.989 18.0.0 CR#11 catD | FS_eFRMCS | Rel-18 |
S1-93-e AI: 5 |
agreed | [WTS] [JSN] |
S1-210398 | Gateway MCX UE identification |
CR revision of S1-210206 |
BDBOS, FirstNet, UIC | 22.28 17.4.0 CR#1441 catB | TEI17 | Rel-17 |
S1-93-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-210399 | Update of requirement for switching of user traffic |
CR revision of S1-210179 |
Nokia, Nokia Shanghai Bell | 22.278 13.5.0 CR#2831 catA | ProSe-SA1 | Rel-13 |
S1-93-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-210400 | Update of requirement for switching of user traffic |
CR revision of S1-210180 |
Nokia, Nokia Shanghai Bell | 22.278 14.5.0 CR#2841 catA | ProSe-SA1 | Rel-14 |
S1-93-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-210401 | Update of requirement for switching of user traffic |
CR revision of S1-210181 |
Nokia, Nokia Shanghai Bell | 22.278 15.4.0 CR#2851 catA | ProSe-SA1 | Rel-15 |
S1-93-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-210402 | Update of requirement for switching of user traffic |
CR revision of S1-210182 |
Nokia, Nokia Shanghai Bell | 22.278 16.2.0 CR#2861 catA | ProSe-SA1 | Rel-16 |
S1-93-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-210403 | Clean-up_alignment of R16 UAS requirements |
CR revision of S1-210259 |
Qualcomm Incorporated | 22.125 16.3.0 CR#331 catF | ID_UAS | Rel-16 |
S1-93-e AI: 6.1 |
agreed | [WTS] [JSN] |
S1-210404 | Modification of requirements for network slice constraints |
CR revision of S1-210124 |
ETRI | 22.261 16.13.0 CR#4981 catF | TEI16 | Rel-16 |
S1-93-e AI: 6.3 |
agreed | [WTS] [JSN] |
S1-210405 | Modification of requirements for network slice constraints |
CR revision of S1-210125 |
ETRI | 22.261 17.5.0 CR#4991 catA | TEI16 | Rel-17 |
S1-93-e AI: 6.3 |
agreed | [WTS] [JSN] |
S1-210406 | Modification of requirements for network slice constraints |
CR revision of S1-210133 |
ETRI | 22.261 18.1.1 CR#5001 catA | TEI16 | Rel-18 |
S1-93-e AI: 6.3 |
agreed | [WTS] [JSN] |
S1-210407 | FS_MMTELin5G References |
pCR revision of S1-210109 |
China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
agreed | [WTS] [JSN] |
S1-210408 | FS_MMTELin5G Overview |
pCR revision of S1-210108 |
China Mobile Com. Corporation | 22.873 0.4.1 | FS_MMTELin5G | Rel-18 |
S1-93-e AI: 7.1.1 |
agreed | [WTS] [JSN] |
S1-210409 | Use case on AI-ML for Smart Automotive systems |
pCR revision of S1-210200 |
Qualcomm Incorporated | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210410 | Use case on shared AI/ML model monitoring |
pCR revision of S1-210209 |
Nokia Shanghai Bell | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] |
S1-210411 | Consolidated KPI for FS_AMMT |
pCR revision of S1-210143 |
OPPO | 22.874 0.2.0 | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
noted | [WTS] [JSN] |
S1-210412 | Cover page for presentation/approval of TR22.874v0.3.0 |
TS or TR cover revision of S1-210304 |
Rapporteur (OPPO) | FS_AMMT | Rel-18 |
S1-93-e AI: 7.4.1 |
agreed | [WTS] [JSN] | |
S1-210413 | 22.926 P-CR: Extra-territorial Areas |
pCR revision of S1-210118 |
Samsung | 22.926 0.2.0 | FS_5GET | Rel-18 |
S1-93-e AI: 7.5.1 |
agreed | [WTS] [JSN] |
S1-210414 | 22.926 P-CR: Communication Regulation In Vessels |
pCR revision of S1-210119 |
Samsung | 22.926 0.2.0 | FS_5GET | Rel-18 |
S1-93-e AI: 7.5.1 |
agreed | [WTS] [JSN] |
S1-210415 | Network selection with extra territoriality |
pCR revision of S1-210269 |
TNO | 22.926 0.2.0 | FS_5GET | Rel-18 |
S1-93-e AI: 7.5.1 |
agreed | [WTS] [JSN] |
S1-210416 | FS_EASNS: References |
pCR revision of S1-210277 |
ETRI | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-210417 | Editorial fix on TR22.835 v0.2.0 |
discussion revision of S1-210051 |
LG Electronics Inc. |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] | |||
S1-210418 | FS_EASNS Overview |
pCR revision of S1-210054 |
LG Electronics Inc. | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-210419 | FS_EASNS PR cleanup |
pCR revision of S1-210026 |
Nokia, Nokia Shanghai Bell | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-210420 | NW slice_Updates and clarifications |
pCR revision of S1-210217 |
Qualcomm Incorporated | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-210421 | Relaying and backhauling data for network slice |
discussion revision of S1-210050 |
LG Electronics Inc. |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] | |||
S1-210422 | Clarification of 'access' for simultaneous access to multiple slices on different VPLMNs |
pCR revision of S1-210220 |
Apple | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-210423 | FS_EASNS clean up of 5.8 |
pCR revision of S1-210025 |
Nokia, Nokia Shanghai Bell | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-210424 | FS_EASNS Update of potential new requirements in use case 5.5 |
pCR revision of S1-210276 |
ETRI | 22.835 0.2.0 | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] |
S1-210425 | FS_EASNS consolidation |
discussion revision of S1-210055 |
LG Electronics Inc. |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] | |||
S1-210426 | Cover page for presentation of TR22.835v0.3.0 |
TS or TR cover revision of S1-210307 |
Rapporteur (LG Electronics) | FS_EASNS | Rel-18 |
S1-93-e AI: 7.6.1 |
agreed | [WTS] [JSN] | |
S1-210427 | New “Monitoring and Control of Critical Infrastructure communication” use case |
pCR revision of S1-210233 |
Union Inter. Chemins de Fer | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-210428 | Off-Net Railways_Update to sec.8 |
pCR revision of S1-210219 |
Qualcomm Incorporated | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-210429 | Add “MCX Support” as an identified issue to be solved by 3GPP technology as required by Off-Network for Rail |
pCR revision of S1-210235 |
Union Inter. Chemins de Fer | 22.99 0.2.0 | FS_OffNetRail | Rel-18 |
S1-93-e AI: 7.7.1 |
agreed | [WTS] [JSN] |
S1-210430 | Enhancement of “Virtual coupling” use case |
discussion revision of S1-210062 |
KRRI |
S1-93-e AI: 7.7.1 |
agreed | [WTS] [JSN] | |||
S1-210431 | Time Resiliency_Updates and clarifications |
pCR revision of S1-210216 |
Qualcomm Incorporated | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
agreed | [WTS] [JSN] |
S1-210432 | FS_5TRS Charging aspects |
pCR revision of S1-210044 |
Nokia, Nokia Shanghai Bell | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
agreed | [WTS] [JSN] |
S1-210433 | FS_5TRS Security clean up |
pCR revision of S1-210045 |
Nokia, Nokia Shanghai Bell | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
agreed | [WTS] [JSN] |
S1-210434 | FS_5TRS Consolidation of potential requirements and KPIs |
pCR revision of S1-210046 |
Nokia, Nokia Shanghai Bell | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
agreed | [WTS] [JSN] |
S1-210435 | FS_5TRS Conclusion |
pCR revision of S1-210047 |
Nokia, Nokia Shanghai Bell | 22.878 0.2.0 | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
agreed | [WTS] [JSN] |
S1-210436 | Presentation of Specification/Report to TSG: TR 22.878 Version 1.0.0 |
TS or TR cover revision of S1-210048 |
Nokia, Nokia Shanghai Bell | FS_5TRS | Rel-18 |
S1-93-e AI: 7.8.1 |
agreed | [WTS] [JSN] | |
S1-210437 | Update to Distributed Feeder Automation use case |
pCR revision of S1-210071 |
CEPRI, ZTE Corporation, China Telecom | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210438 | Clarify the KPI table in section 5.2 |
pCR revision of S1-210070 |
CEPRI, ZTE Corporation, China Telecom | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210439 | P-CR 22.267 clause 5.5 – update KPIs and requirements |
pCR revision of S1-210113 |
Samsung Electronics GmbH | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210440 | P-CR 22.267 clause 5.7 – update KPIs and requirements |
pCR revision of S1-210114 |
Samsung, EUTC | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
noted | [WTS] [JSN] |
S1-210441 | Update to 5.8 Smart Distribution Transformer Terminal |
pCR revision of S1-210072 |
CEPRI, ZTE Corporation, China Telecom | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210442 | Review of new requirements identified by 22.867 for 5.9 Use case of isolation demand for energy applications |
pCR revision of S1-210158 |
Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210443 | P-CR 22.267 clause 5.11 – QoS Reporting Requirement Update |
pCR revision of S1-210115 |
Samsung, EUTC | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210444 | Smart Grid_clarifications to requirements |
pCR revision of S1-210215 |
Qualcomm Incorporated | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210445 | S1-204xxx Update to the Use Case of supporting communication for the transmission of synchrophasors in wide-area smart grid |
pCR revision of S1-210095 |
Huawei Technologies France | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210446 | Use case on “Distributed Energy Resources and Micro-Grids” |
pCR revision of S1-210087 |
Huawei Technologies Sweden AB | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210447 | Use Case for Protection of interconnection between renewable and utility grid |
pCR revision of S1-210096 |
Huawei Technologies France | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210448 | Use Case of Utility Service Operator M2M service management platform in Smart Energy |
pCR revision of S1-210097 |
Huawei Technologies France | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210449 | 22.876 P-CR: Coordination for Energy Recovery Use Case |
pCR revision of S1-210116 |
Samsung, EUTC | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210450 | Use case on applications using IEC 61850-9-2 sampled values |
pCR revision of S1-210161 |
Nokia, Nokia Shanghai Bell | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210451 | Use Case of power distribution grid state estimation service |
pCR revision of S1-210171 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210452 | Use Case of power distribution grid load and generation prediction service |
pCR revision of S1-210174 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210453 | Use Case of power distribution grid power control service |
pCR revision of S1-210176 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210454 | Use Case of ensuring uninterrupted MTC service availability during emergencies |
pCR revision of S1-210177 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210455 | Edge cloud driven data acquisition (edgePMU) |
pCR revision of S1-210185 |
Ericsson | 22.867 0.2.0 | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] |
S1-210456 | Presentation of Specification/Report to TSG: TR 22.867, Version 0.3.0 |
TS or TR cover revision of S1-210163 |
China Telecomunication Corp. | FS_5GSEI | Rel-18 |
S1-93-e AI: 7.9.1 |
agreed | [WTS] [JSN] | |
S1-210457 | clean up definition |
pCR revision of S1-210073 |
ZTE Corporation, Xiaomi | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210458 | updated Ranging use case - Touchless self-checkout machine control |
pCR revision of S1-210145 |
OPPO | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210459 | Ranging-use case update-enable disable ranging and ranging interval |
pCR revision of S1-210190 |
Xiaomi Communications | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210460 | UC of power efficient ranging operation |
pCR revision of S1-210074 |
ZTE Corporation, Xiaomi | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210461 | New use case: Immersive sound based on coordinated ranging |
pCR revision of S1-210130 |
Huawei, Hisilicon | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210462 | 22.855 P-CR: Object Finding and Tracking Use Case |
pCR revision of S1-210138 |
Samsung Electronics GmbH | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210463 | New use case on clustering of devices |
pCR revision of S1-210271 |
Philips International B.V. | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210464 | New use case on tracking of device position |
pCR revision of S1-210272 |
Philips International B.V. | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210465 | Ranging-use cases new-remote Access Right authorization |
pCR revision of S1-210192 |
Xiaomi Communications | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210466 | Ranging-use cases new-Sharing content to a particular UE |
pCR revision of S1-210196 |
Xiaomi Communications | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210467 | FS_Ranging consolidated requirements |
pCR revision of S1-210018 |
Beijing Xiaomi Mobile Software | 22.855 0.2.0 | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] |
S1-210468 | Presentation of TR22855 |
TS or TR cover revision of S1-210021 |
Beijing Xiaomi Mobile Software | FS_Ranging | Rel-18 |
S1-93-e AI: 7.10.1 |
agreed | [WTS] [JSN] | |
S1-210469 | Definition of customer premises network |
pCR revision of S1-210123 |
KPN N.V. | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210470 | Update use case 5.2: Service restriction for visitor access scenario |
pCR revision of S1-210064 |
Huawei, Hisilicon, KPN | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210471 | FS_Resident Additional requirement for use case |
pCR revision of S1-210170 |
OTD | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210472 | FS_Resident: Resolving the Editor’s note on the use case of seamless switching to a service hosting environment via an evolved residential gateway |
pCR revision of S1-210016 |
InterDigital | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210473 | Update Use case 5.11 for UE security and privacy |
pCR revision of S1-210231 |
Intel | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210474 | FS_Resident: New use case on Local control of PRASs connectivity for UEs access to a device in a CPN |
pCR revision of S1-210013 |
InterDigital, KPN, vivo Mobile Communications Co. LTD. | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210475 | New use case on IP traffic offload |
pCR revision of S1-210028 |
Spreadtrum Communications | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210476 | New use case on RAN sharing |
pCR revision of S1-210030 |
Spreadtrum Communications | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210477 | New Use Case of User Level Granularity Multicast Service Access Control |
pCR revision of S1-210066 |
Huawei, Hisilicon | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210478 | Use case on the connection of 5G LAN with fixed IP VPN |
pCR revision of S1-210152 |
China Telecom Corporation Ltd. | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210479 | New use case: Loss of connectivity between eRG or PRAS and 5GC |
pCR revision of S1-210221 |
Apple | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210480 | Control of Customer Premises Network by Authorised Administrator |
pCR revision of S1-210222 |
KPN N.V. | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210481 | Enable support for user centric identifiers and authentication in Residential |
pCR revision of S1-210236 |
Intel | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
noted | [WTS] [JSN] |
S1-210482 | Use case:eRG supporting Multiple connectivity |
pCR revision of S1-210252 |
vivo Mobile Com. (Chongqing) | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] |
S1-210483 | FS_Resident: Use case on enabling minimum user interaction for a mobile evolved residential gateway |
pCR revision of S1-210258 |
InterDigital | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
noted | [WTS] [JSN] |
S1-210484 | FS_Resident: Use case on seamless and low latency access for a remote UE in residential network |
pCR revision of S1-210260 |
InterDigital | 22.858 0.2.0 | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
noted | [WTS] [JSN] |
S1-210485 | Cover page for presentation of TR22.855v0.3.0 |
TS or TR cover revision of S1-210312 |
Rapporteur (KPN) | FS_Resident | Rel-18 |
S1-93-e AI: 7.11.1 |
agreed | [WTS] [JSN] | |
S1-210486 | FS_PIN: Definition update |
pCR revision of S1-210238 |
vivo Mobile Com. (Chongqing), InterDigital, Intel | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210487 | FS_PIN: Definition update – PIN Element |
pCR revision of S1-210239 |
vivo Mobile Com. (Chongqing), InterDigital | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210488 | FS_PIN: Overview update – add diagrams |
pCR revision of S1-210268 revised to S1-210531 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
revised | [WTS] [JSN] |
S1-210489 | FS_PIN: Considerations |
pCR revision of S1-210243 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210490 | FS_PIN: Use case update: “inhome” – add coverage / connectivity requirements |
pCR revision of S1-210241 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210491 | FS_PIN: Use case update – Positioning with VR and AR |
pCR revision of S1-210245 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210492 | 22.859 P-CR: 5.3 Requirements update |
pCR revision of S1-210137 |
Samsung Electronics GmbH | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210493 | FS_PIN: Resolving Editor's Notes on the Use Case UE accessing PIN applications hosted by gateways |
pCR revision of S1-210078 |
InterDigital | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210494 | FS_PIN: Use case update: The Tour Guide |
pCR revision of S1-210242 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210495 | Update of use case 5.8 support of broadcast-based service discovery |
pCR revision of S1-210253 |
KPN N.V. | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210496 | New Use case for FS_PIN: dynamic creation of an on-demand 5G PIN Non-Public-network at home |
pCR revision of S1-210121 |
Futurewei, Philips | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210497 | FS_PIN: New use case: Smart Dog Collar |
pCR revision of S1-210246 |
vivo Mobile Com. (Chongqing), Intel | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
S1-210498 | Presentation of Specification/Report to TSG: TR 22.859, Version 1.0.0 |
TS or TR cover revision of S1-210247 |
vivo Mobile Com. (Chongqing) | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] | |
S1-210499 | Interworking scenarios for PALS |
pCR revision of S1-210224 |
Intel | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210500 | FS_PALS update of section |
discussion revision of S1-210056 |
LG Electronics Inc. |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] | |||
S1-210501 | Updates of Use case 5.3 for accessing home network service via PALS network |
pCR revision of S1-210225 |
Intel | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210502 | Updates of Use case 5.4 for on demand PALS services |
pCR revision of S1-210227 |
Intel | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210503 | Update to Discovery and access use case |
pCR revision of S1-210194 |
Qualcomm Incorporated | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210504 | Update to In venue registration use case |
pCR revision of S1-210193 |
Qualcomm Incorporated | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210505 | FS_PALS: Update to the Use Case Hosting network deployment for a temporary event |
pCR revision of S1-210079 |
InterDigital | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210506 | Use case of home service provider dynamically steering UEs between different PALS service networks |
pCR revision of S1-210120 |
Futurewei, Philips | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210507 | Use case on network selection based on application for Localized Service |
pCR revision of S1-210127 |
Alibaba Group | 22.844 0.1.1 | FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210508 | 22.844 P-CR: Broadcast and Multicast Local Service Use Case |
pCR revision of S1-210132 |
Samsung Electronics GmbH | 22.844 0.1.1 | FS_VMR, FS_PALS | Rel-18 |
S1-93-e AI: 7.13.1 |
agreed | [WTS] [JSN] |
S1-210509 | Updates to Multiple working modes of vehicle mounted base station |
pCR revision of S1-210147 |
CATT | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] |
S1-210510 | UC of Group UE’s service continuity |
pCR revision of S1-210075 |
ZTE Corporation, Qualcomm | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] |
S1-210511 | Use case on mobile relays sharing |
pCR revision of S1-210195 |
Qualcomm Incorporated | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] |
S1-210512 | Use case on relay-macro simultaneous connectivity |
pCR revision of S1-210197 |
Qualcomm Incorporated | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] |
S1-210513 | Use case on managing UEs inside the vehicle |
pCR revision of S1-210198 |
Qualcomm Incorporated | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] |
S1-210514 | FS_VMR: use case on Optimizing mobility for UEs from planned or predicted mobility information |
pCR revision of S1-210257 |
InterDigital | 22.839 0.1.0 | FS_VMR | Rel-18 |
S1-93-e AI: 7.14.1 |
agreed | [WTS] [JSN] |
S1-210515 | Changes to Critical Support Applications “Inviting-a-FRMCS User to a voice communication” use case |
CR revision of S1-210249 |
UIC | 22.989 18.0.0 CR#21 catC | FS_eFRMCS | Rel-18 |
S1-93-e AI: 7.15.1 |
agreed | [WTS] [JSN] |
S1-210516 | Merging of Railway Emergency Communications |
CR revision of S1-210250 |
UIC | 22.989 18.0.0 CR#31 catC | FS_eFRMCS | Rel-18 |
S1-93-e AI: 7.15.1 |
agreed | [WTS] [JSN] |
S1-210517 | pCR TR 22.847 Add skeleton |
pCR revision of S1-210081 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
agreed | [WTS] [JSN] |
S1-210518 | pCR TR 22.847 Add scope |
pCR revision of S1-210082 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
agreed | [WTS] [JSN] |
S1-210519 | pCR TR 22.847 Add overview |
pCR revision of S1-210083 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
agreed | [WTS] [JSN] |
S1-210520 | Use case for Immersive Multi-modal Virtual Reality application |
pCR revision of S1-210065 |
Huawei, Hisilicon | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
agreed | [WTS] [JSN] |
S1-210521 | FS_TACMM Use case: Remote control robot |
pCR revision of S1-210084 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
agreed | [WTS] [JSN] |
S1-210522 | FS_TACMM Use case: Immersive VR games |
pCR revision of S1-210085 |
China Mobile Com. Corporation | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
agreed | [WTS] [JSN] |
S1-210523 | Support of Skillset Sharing for Cooperative Automated Driving |
pCR revision of S1-210265 |
LG Electronics Deutschland | 22.847 0.0.0 | FS_TACMM | Rel-18 |
S1-93-e AI: 7.16.1 |
agreed | [WTS] [JSN] |
S1-210524 | Updated SA1 ToR, using new template |
ToR revision of S1-210139 |
Samsung Electronics GmbH |
S1-93-e AI: 8 |
agreed | [WTS] [JSN] | |||
S1-210525 | Report on 5G Timing Resiliency System (5TRS | report | Nokia |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210526 | Report on Enhanced Access to and Support of Network Slice (EASNS) | report | LG Electronics Inc |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210527 | Report on Ranging-based service Requirements (Ranging) | report | Xiaomi |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210528 | Report on Low Power High Accuracy Positioning for industrial IoT scenarios (LPHAP) | report | China Unicom |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210529 | Report on Data Integrity in 5G (DI_5G) | report | Huawei |
S1-93-e AI: 10.2 |
noted | [WTS] [JSN] | |||
S1-210530 | Not allocated | other | Withdrawn |
S1-93-e AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-210531 | FS_PIN: Overview update – add diagrams |
pCR revision of S1-210488 |
vivo Mobile Com. (Chongqing) | 22.859 0.2.0 | FS_PIN | Rel-18 |
S1-93-e AI: 7.12.1 |
agreed | [WTS] [JSN] |
532 documents (1.0756001472473 seconds)