Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S1-231000 | 1st Draft Agenda for SA1#102 |
agenda revised to S1-231001 |
SA1 Chairperson |
S1-102 AI: 2 |
revised | [WTS] [JSN] | |||
S1-231001 | 2nd Draft Agenda for SA1#102 |
agenda revision of S1-231000 revised to S1-231002 |
SA1 Chairperson |
S1-102 AI: 2 |
revised | [WTS] [JSN] | |||
S1-231002 | 2nd Draft Agenda for SA1#102 |
agenda revision of S1-231001 |
SA1 Chairperson |
S1-102 AI: 2 |
agreed | [WTS] [JSN] | |||
S1-231003 | Extract of the 3GPP Work Plan for SA1#102 | Work Plan | ETSI MCC |
S1-102 AI: 2 |
noted | [WTS] [JSN] | |||
S1-231004 | Draft minutes of previous SA1 meeting |
report revised to S1-231005 |
ETSI MCC |
S1-102 AI: 2 |
revised | [WTS] [JSN] | |||
S1-231005 | Minutes of previous SA1 meeting |
report revision of S1-231004 |
ETSI MCC |
S1-102 AI: 2 |
agreed | [WTS] [JSN] | |||
S1-231006 | SA1-related topics at SA#99e | report | SA1 Chairperson |
S1-102 AI: 2 |
noted | [WTS] [JSN] | |||
S1-231007 | MCC info on CR Rules | other | ETSI MCC |
S1-102 AI: 2 |
noted | [WTS] [JSN] | |||
S1-231008 | MCC info on WID names | other | ETSI MCC |
S1-102 AI: 2 |
noted | [WTS] [JSN] | |||
S1-231009 | Draft SA1 slides to Rel-19 TSG workshop | other | SA1 Chair |
S1-102 AI: 2 |
noted | [WTS] [JSN] | |||
S1-231010 | Reserved | other | SA1 Chair & ETSI MCC |
S1-102 AI: 2 |
withdrawn | [WTS] [JSN] | |||
S1-231011 | Initial considerations about Rel-20 calendar |
other revised to S1-231465 |
SA1 Chair & ETSI MCC |
S1-102 AI: 2 |
revised | [WTS] [JSN] | |||
S1-231012 | New template for Status Report | other | SA1 Chair & ETSI MCC |
S1-102 AI: 2 |
noted | [WTS] [JSN] | |||
S1-231013 | PCR on Update of 5.15 Access to avatars | pCR | China Telecom | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231014 | PCR on Update of 5.28 User identities in a digital asset container |
pCR revised to S1-231590 |
China Telecom | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231015 | Merged potential service requirements on digital asset management | pCR | China Telecom, Orange, China Mobile, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
withdrawn | [WTS] [JSN] |
S1-231016 | Update of the Use Case on Authorization of Avatar Usage Rights | pCR | China Mobile, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
withdrawn | [WTS] [JSN] |
S1-231017 | Use Case on supplementary downlink data via a second 3GPP network |
pCR revised to S1-231602 |
Thales, Lockheed Martin, SES, Avanti, Intelsat, CeWIT, Airbus, Hispasat, Inmarsat, Gilat, TNO, ESA, Qualcomm, Novamint | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231018 | Annex A1 List of Potential Requirements | pCR | ZTE | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
noted | [WTS] [JSN] |
S1-231019 | Requirements Consolidation- Further Aspects |
pCR revised to S1-231344 |
ZTE | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231020 | Corrections of scope and reference including editorial fixes |
CR revised to S1-231396 |
ETRI | 22.268 18.2.0 CR#78 catF | TEI18 | Rel-18 |
S1-102 AI: 6.1 |
revised | [WTS] [JSN] |
S1-231021 | Reply LS on issues related to SNPN selection for localized services | LS in | CT1 | eNPN_Ph2 | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |
S1-231022 | Reply LS on 3GPP work on Energy Efficiency | LS in | CT1 | EE5GPLUS_Ph2 | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |
S1-231023 | LS on periodic attempts for re-selection to a higher priority SNPN when access for | LS in | CT1 | eNPN_Ph2 | Rel-18 |
S1-102 AI: 3 |
replied to | [WTS] [JSN] | |
S1-231024 | Response to Reply LS on Proposed method for Time Synchronization status | LS in | CT1 | TRS_URLLC | Rel-18 |
S1-102 AI: 3 |
replied to | [WTS] [JSN] | |
S1-231025 | LS on access to stand-alone non-public network services via PLMN and vice versa | LS in | CT1 |
S1-102 AI: 3 |
postponed | [WTS] [JSN] | |||
S1-231026 | Reply LS on 3GPP work on Energy Efficiency | LS in | CT3 | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | ||
S1-231027 | Reply LS to SA2 on Low Power High Accuracy Positioning | LS in | RAN2 | NR_pos_enh2 | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |
S1-231028 | Reply LS on 5G capabilities exposure for factories of the future identified | LS in | SA2 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231029 | LS on the requirement on low power or high accuracy positioning | LS in | SA2 | 5G_eLCS_Ph3 | Rel-18 |
S1-102 AI: 3 |
replied to | [WTS] [JSN] | |
S1-231030 | Reply LS on clarification on user consent for AI/ML | LS in | SA2 | FS_AIMLsys | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |
S1-231031 | Reply LS on issues related to SNPN selection for localized services | LS in | SA2 | eNPN, eNPN_Ph2 | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |
S1-231032 | LS reply to TSG SA on LS 5G-ACIA-LS-2022-005 on 5G capabilities exposure for factories of the future identified gaps from 5G ACIA | LS in | TSG SA3 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231033 | Reply LS on the user consent for trace reporting | LS in | SA3 | NR_ENDC_SON_MDT_enh-Core | Rel-17 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |
S1-231034 | LS on Roaming architecture updates | LS in | SA3 | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | ||
S1-231035 | LS on customer acceptance of limited QoS degradation to save energy in the network | LS in | SA5 | FS_EE5G_Ph2 | Rel-18 |
S1-102 AI: 3 |
replied to | [WTS] [JSN] | |
S1-231036 | Reply LS on DN energy efficiency | LS in | SA5 | EE5GPLUS_Ph2 | Rel-18 |
S1-102 AI: 3 |
replied to | [WTS] [JSN] | |
S1-231037 | LS on 3GPP work on Energy Efficiency | LS in | SA5 | EE5GPLUS_Ph2 | Rel-18 |
S1-102 AI: 3 |
replied to | [WTS] [JSN] | |
S1-231038 | LS reply to TSG SA on LS 5G-ACIA-LS-2022-005 on 5G capabilities exposure for factories of the future – identified gaps from 5G ACIA | LS in | SA6 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231039 | LS on SA6 V2X service support | LS in | SA6 | V2XAPP, ADAES, SNAAPP | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |
S1-231040 | Reply LS to SA1 on SENSE for home PLMN and disaster roaming PLMN | LS in | C1-231235 | Rel-18 |
S1-102 AI: 3 |
replied to | [WTS] [JSN] | ||
S1-231041 | New WID on Integrated Sensing and Communication |
WID new revised to S1-231446, S1-231494 |
Deutsche Telekom AG, Orange, Sharp Corporation, ZTE | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231042 | Discussion on UE-to-UE multi hop relay |
discussion revised to S1-231346 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L’Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231043 | UE-to-UE multi-hop relay |
WID new revised to S1-231387 |
FirstNet, SyncTechno Inc., Erillisverkot , Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231044 | UE-to-UE Multi-hop relay requirements for mission critical communications |
CR revised to S1-231386 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm | 22.261 19.2.0 CR#681 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231045 | UE-to-UE Multi-hop relay requirements for mission critical communications |
CR revised to S1-231388 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm | 22.28 19.1.0 CR#160 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231046 | Support of a new TS for Integrated Sensing and Communication | discussion | Sharp | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] | ||
S1-231047 | Support of a new TS for Ambient power-enabled Internet of Things | discussion | Sharp | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] | ||
S1-231048 | Updated Consolidation on general and charging reqs |
pCR revised to S1-231507 |
China Unicom, Charter Communications?, ZTE Corporation? and CATT? | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231049 | Add Indirect Network Sharing to TS 22.261 |
CR revised to S1-231712 |
China Unicom, CATT, ZTE Corporation and Charter Communications | 22.261 19.2.0 CR#682 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231050 | WID on Indirect Network Sharing |
WID new revised to S1-231515 |
China Unicom, China Telecom, Charter Communications, vivo, CAICT, CATT, Tencent, Spreadtrum Communications, Xiaomi, ZTE Corporation, CITC, OPPO, one2many | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231051 | Use Case on traffic duplication for a set of devices | pCR | NEC | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
withdrawn | [WTS] [JSN] |
S1-231052 | FS_Netshare Conclusions and Recommendations |
pCR revised to S1-231522 |
China Unicom | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231053 | General and charging requirements of INS to TS 22.261 | CR | China Unicom, Charter Communications, ZTE Corporation and CATT? | 22.261 19.2.0 CR#683 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] |
S1-231054 | Discussion on Low Power High Accuracy Positioning (LPHAP) | discussion | Xiaomi, Inspur | LPHAP | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |
S1-231055 | LS to 3GPP (SA, SA1, SA2, SA3, CT4) on GSMA requirements regarding intermediaries in the roaming ecosystem | LS in | GSMA 5GMRR Doc 41_37r2 |
S1-102 AI: 3 |
replied to | [WTS] [JSN] | |||
S1-231056 | LS to 3GPP SA1, SA2, SA3 on response to 3GPP on IPX Requirements for 5GS Roaming | LS in | GSMA 5GMRR#41 Doc 38r2 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231057 | LS to 3GPP SA1, SA2, SA3 on Roaming Value Added Service Requirements | LS in | GSMA 5GMRR Doc 41_39r2 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231058 | LS to 3GPP SA1, SA2, SA3 on Roaming Hubbing requirements and response to S3-214456 | LS in | GSMA 5GMRR Doc 41_40r4 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231059 | LS (cc SA1) on GSMA 5GMRR Working solution assumption on L-PRINS and Data Session Control | LS in | GSMA 5GMRR Doc 41_41r3 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231060 | LS to 3GPP SA 1 on Video Coding for Machines and Haptic Use Cases | LS in | ISO/IEC JTC 1/SC 29 N 21129 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231061 | Reply LS (cc SA1) on Progress and open issues for NPN enhancements in Rel-18 | LS in | S2-2303689 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231062 | LS to SA, SA1, SA2, SA3, SA5, SA6 An Invitation to the SA4 Gender Diversity Committee Meetings | LS in | S4-230431 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231063 | LS (Cc SA1) on initiation of new work item ITU-T Y.REOUPF: “Resource efficiency optimization for managing user plane function in IMT-2020 networks and beyond” | LS in | ITU-T Study Group 13 -LS79 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231064 | LS to SA1 on requesting collaboration on metaverse standardization work | LS in | ITU T Focus Group on metaverse (FG-MV)-LS1 |
S1-102 AI: 3 |
replied to | [WTS] [JSN] | |||
S1-231065 | LS to SA1 on Information and request of advice on the SG13 plan to initiate a new work item on "Requirements and framework of network function enhancements of IMT-2020 networks and beyond from the energy efficiency perspective" at its 23 October - 3 November 2023 meeting | LS in | ITU T SG13-LS78 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231066 | Reply LS (cc SA1) on 5G capabilities exposure for factories of the future – identified gaps | LS in | SP-230384 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |||
S1-231067 | Pseudo-CR on Adding the new use case on Energy-Efficient Utilization of 5G Idle Computing Power |
pCR revised to S1-231538 |
AsiaInfo | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231068 | Add definitions for Indirect Network Sharing |
CR revised to S1-231736 |
China Unicom, CATT, Huawei, ZTE, Charter Communications, Nokia? | 22.261 19.2.0 CR#684 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231069 | pCR on resolving EN in 5.9 Use case on Renewable Energy usage information exposure |
pCR revised to S1-231530 |
Rakuten Mobile, Toyota Motor Corporation, MediaTek Inc, [China Mobile] | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231070 | Discussion about Consolidation on Potential Requirements of satellite access phase3 | pCR | China Telecommunications | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
withdrawn | [WTS] [JSN] |
S1-231071 | Discussion about Consolidation on Potential Requirement of FS_5GSAT_Ph3 | discussion | China Telecom | Rel-19 |
S1-102 AI: 7.7 |
merged | [WTS] [JSN] | ||
S1-231072 | Pseudo-CR on consolidated potential requirements of FS_5GSAT_Ph3 | pCR | China Telecom | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
merged | [WTS] [JSN] |
S1-231073 | Reply on Reply LS to CT1 on SENSE for home PLMN and disaster roaming PLMN |
LS out revised to S1-231354 |
vivo | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231074 | resolve of EN for use case 5.2 |
pCR revised to S1-231537 |
vivo | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231075 | Discussion on consolidated KPIs of FS_Sensing |
discussion revised to S1-231418 |
Deutsche Telekom AG, Nokia, Ericsson | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | ||
S1-231076 | LS to SA (cc SA2, SA3, CT4) on LS on GSMA requirements regarding intermediaries in the roaming |
LS out revised to S1-231379 |
Deutsche Telekom |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |||
S1-231077 | Pseudo-CR on Consolidated KPIs of FS_Sensing |
pCR revised to S1-231419 |
Deutsche Telekom AG, Nokia, Ericsson | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231078 | Update of Use case 5.12 |
pCR revised to S1-231410 |
vivo, OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231079 | Power consumption descriptions for use case 24 and 25 |
pCR revised to S1-231413 |
vivo, Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231080 | Use case on Scalable SNPN Interconnect with dynamic connections | pCR | Intel, Cisco Systems, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231081 | New WID on Mobile Metaverse Services |
WID new revised to S1-231595 |
Samsung | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231082 | Clarification on AI-ML KPIs |
CR revised to S1-231395 |
OPPO | 22.261 19.2.0 CR#685 catF | DUMMY | Rel-19 |
S1-102 AI: 5 |
revised | [WTS] [JSN] |
S1-231083 | Clarification on AI-ML KPIs |
CR revised to S1-231394 |
OPPO | 22.261 18.9.0 CR#686 catF | DUMMY | Rel-18 |
S1-102 AI: 5 |
revised | [WTS] [JSN] |
S1-231084 | Pseudo-CR on update for scope and overview sections |
pCR revised to S1-231560 |
Novamint, Nokia, China Telecom, Huawei | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231085 | Pseudo-CR on update and clean-ups for TR 22.865 |
pCR revised to S1-231575 |
Novamint, China Telecom | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231086 | Consolidation proposal for TR 22.865 |
discussion revised to S1-231382 |
Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] | |||
S1-231087 | Pseudo-CR on consolidated requirements for TR 22.865 |
pCR revised to S1-231383 |
Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231088 | Pseudo-CR on conclusions for TR 22.865 | pCR | Novamint, Nokia, China Telecom, Huawei | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231089 | New WID: Satellite access - Phase 3 | WID new | Novamint, China Telecom, Thales, Airbus, Avanti, CEWiT, ESA, ETRI, Eutelsat, GateHouse, Gilat, Hughes Network systems, IIIT Hyderabad, Inmarsat, Intelsat, IRT Saint Exup ry, Ligado, Lockheed Martin, Nokia, Omnispace, OneWeb, Sateliot, SES, ST Engineering iDirect Ireland, TNO, TTP | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231090 | Presentation of Specification/Report to TSG: TR 22.856 1.1.0 |
TS or TR cover revised to S1-231777 |
Samsung | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] | |
S1-231091 | FS_Metaverse Status Report | report | SAMSUNG R&D INSTITUTE JAPAN | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
withdrawn | [WTS] [JSN] | |
S1-231092 | 22.856 pCR UPdate 5.8 Use Case Supporting multi-service coordination in one mobile metaverse service |
pCR revised to S1-231584 |
Samsung, China Mobile | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231093 | 22.856 pCR Update 5.27 Use case of Localized Mobile Metaverse Overload |
pCR revised to S1-231589 |
Samsung | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231094 | 22.856 pCR: Removal of all Editor's Notes |
pCR revised to S1-231582 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231095 | LS to ITU-T SG16 (cc SA4) on [DRAFT] LS on IMS-based 3D Avatar Call Support for Accessibility | LS out | Samsung | Rel-19 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | ||
S1-231096 | LS to CT1 (cc SA2) on [Draft] LS on periodic attempts for re-selection to a higher priority SNPN |
LS out revised to S1-231366 |
OPPO [to be SA1] | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231097 | Consolidation of Ambient IoT functional CPR |
pCR revised to S1-231351 |
OPPO (Rapporteur) | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231098 | Consolidation on Functional Requirement of AIML-Ph2 |
pCR revised to S1-231352 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] |
S1-231099 | Consolidation on KPI table of AIML-Ph2 |
pCR revised to S1-231511 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] |
S1-231100 | 22.856 pCR Add conclusion |
pCR revised to S1-231594 |
Samsung (Rapporteur) | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231101 | New WID on AI/ML Model Transfer-Phase 2 |
WID new revised to S1-231513 |
OPPO | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231102 | TR conclusion of AIML-Ph2 |
pCR revised to S1-231512 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] |
S1-231103 | FS_Metaverse Requirement Consolidation |
pCR revised to S1-231350 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231104 | Pseudo-CR on TR updates and clean-up | pCR | OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
agreed | [WTS] [JSN] |
S1-231105 | CR on interconnection of on-board naval non-public networks |
pCR revised to S1-231502 |
b<>com, Airbus, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231106 | CR on mobility between naval non-public networks |
pCR revised to S1-231516 |
b<>com, Airbus, Novamint | 22.848 0.1.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231107 | CR on remote driving of trains between maintenance centers and railways stations | pCR | b<>com, (SNCF), Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
noted | [WTS] [JSN] |
S1-231108 | CR on European Train Control System (ETCS) and Ground to Train Radio (GTR) service continuity at border crossing | pCR | b<>com, (SNCF), Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
withdrawn | [WTS] [JSN] |
S1-231109 | pCR to TR 22.865: Requirement Consolidation for KPIs |
pCR revised to S1-231593 |
Huawei, Samsung, Nokia, Nokia Shanghai Bell, Tencent | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231110 | Use case on energy as service criteria for 5G environment adaptation |
pCR revised to S1-231539 |
SK Telecom, LG Uplus, Rakuten, ETRI, KT, Nokia, Nokia Shanghai Bell, NTT DOCOMO | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231111 | Pseudo-CR on definition of identity provider | pCR | NEC | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
noted | [WTS] [JSN] |
S1-231112 | Use Case on Interconnectivity between SNPNs |
pCR revised to S1-231517 |
NEC | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231113 | New WID on FRMCS Phase 5 | WID new | Union Internationale des Chemins de Fer | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231114 | pCR on updating service requirements for clause 5.1 | pCR | CMCC | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
merged | [WTS] [JSN] |
S1-231115 | pCR on update service requirements for clause 5.13 | pCR | CMCC | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
merged | [WTS] [JSN] |
S1-231116 | pCR on updating KPI for clause 5.14 |
pCR revised to S1-231433 |
CMCC | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231117 | pCR on updating service requirements for clause 5.1 |
pCR revised to S1-231562 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231118 | pCR on update service requirements for clause 5.2 |
pCR revised to S1-231564 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231119 | pCR on updating service requirements for clause 5.6 |
pCR revised to S1-231566 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231120 | Pseudo-CR on update of clause 5.1 Use case on store and forward - MO |
pCR revised to S1-231563 |
ETRI, Novamint, Lockheed Martin | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231121 | Pseudo-CR on update of clause 5.14 Use case on service continuity for UE-to-UE communication between satellites | pCR | ETRI, Novamint, Lockheed Martin | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231122 | Pseudo-CR on update of clause 5.15 Use case on service continuity for UE-to-UE communication in case of mobility between satellite and terrestrial network | pCR | ETRI, Novamint, Lockheed Martin | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
noted | [WTS] [JSN] |
S1-231123 | Use Case # 24 update on sensing service authorization |
pCR revised to S1-231435 |
Futurewei, Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231124 | UE based geo-fencing requirements for KPAS |
CR revised to S1-231398 |
ETRI, KT Corp, SK Telecom, LG Uplus | 22.268 18.2.0 CR#79 catB | TEI18 | Rel-18 |
S1-102 AI: 6.1 |
revised | [WTS] [JSN] |
S1-231125 | Pseudo-CR on the update for clause 5.21 Virtual Emergency Drill | pCR | Rakuten Mobile | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
noted | [WTS] [JSN] |
S1-231126 | New WID on Energy Efficiency as Service Criteria |
WID new revised to S1-231545 |
China Mobile | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231127 | pCR on resolving EN in 5.6 Use case on supporting service-level energy efficiency analysis for verticals |
pCR revised to S1-231532 |
China Mobile | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231128 | Consolidation requirements on FS_EnergyServ |
pCR revised to S1-231440 |
China Mobile, Samsung | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231129 | pCR on clean-up of TR 22.882 |
pCR revised to S1-231531 |
China Mobile | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231130 | TR 22.882 coversheet for SA approval |
TS or TR cover revised to S1-231745 |
China Mobile | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | |
S1-231131 | Supporting UE Mobility for XR service |
CR revised to S1-231476 |
China Mobile | 22.261 19.2.0 CR#687 catB | XRMobility | Rel-19 |
S1-102 AI: 7.13 |
revised | [WTS] [JSN] |
S1-231132 | LS to CT1 (cc SA2) on [DRAFT] Reply LS on access to stand-alone non-public network services |
LS out revised to S1-231714 |
China Mobile | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231133 | LS to SA5 (cc SA6) on [DRAFT] Reply LS on Reply LS on DN energy efficiency |
LS out revised to S1-231377 |
China Mobile | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231134 | LS to SA5 (cc GSMA ENSWI, SA) on [DRAFT] Reply LS on customer acceptance of limited QoS degradation to | LS out | China Mobile | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231135 | Update to Use Case on AGVs Detection and Tracking in Factories | pCR | Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231136 | Update to Use Case on Use case on UAV flight trajectory tracing | pCR | Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231137 | Pseudo-CR on Security Consideration |
pCR revised to S1-231508 |
CATT, Charter Communications | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231138 | Pseudo-CR on Updates of 5.7 Long Distance Mobility | pCR | CATT | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] |
S1-231139 | Terminology Adaption and Alignment |
pCR revised to S1-231523 |
CATT | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231140 | Pseudo-CR on Consolidation access control and security aspects |
pCR revised to S1-231514 |
CATT, China Unicom, Charter Communications | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231141 | Pseudo-CR on Updates of 5.10 Vehicle Fleet Management |
pCR revised to S1-231567 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231142 | Pseudo-CR on Updates of 5.13 Enhanced Positioning Service |
pCR revised to S1-231572 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231143 | Pseudo-CR on Updates of 5.2 Store and Forward - MT |
pCR revised to S1-231565 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231144 | Pseudo-CR on new terminology for UE-Satellite-UE communication |
pCR revised to S1-231561 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231145 | Pseudo-CR on Updates of 5.29 Gesture Recognition | pCR | CATT | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
merged | [WTS] [JSN] |
S1-231146 | Update to Use Case of Seamless XR Streaming |
pCR revised to S1-231434 |
Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231147 | Update to Use Case on Gesture Recognition for Application Navigation and Immersive Interaction |
pCR revised to S1-231436 |
Qualcomm, OPPO, Xiaomi | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231148 | Pseudo-CR on consolidation of requirements on UE-based sensing when not served by RAN |
pCR revised to S1-231363 |
Qualcomm, Huawei, OPPO, Xiaomi | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231149 | Discussion on sensing concepts and relationship between sensing system and 3GPP communication system | discussion | Xiaomi |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] | |||
S1-231150 | Update to Use Case on Ambient IoT for airport terminal / shipping port |
pCR revised to S1-231364 |
Qualcomm | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231151 | Update to Use Case on Finding Lost Item |
pCR revised to S1-231365 |
Qualcomm, Futurewei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231152 | Clarification on RAN impact of dual steering |
pCR revised to S1-231601 |
vivo | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231153 | pCR on Consolidation of potential KPI requirements of Sensing |
pCR revised to S1-231349 |
ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231154 | Pseudo-CR to add the position KPI for 5.2 |
pCR revised to S1-231400 |
ZTE | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231155 | Pseudo-CR to resolve the EN in clause 5.7 | pCR | ZTE | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231156 | Skeleton for TR 22.848 Interconnect of SNPN | draft TR | NOVAMINT | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
agreed | [WTS] [JSN] | |
S1-231157 | Pseudo-CR on Scope for TR 22.848 | pCR | Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
agreed | [WTS] [JSN] |
S1-231158 | Pseudo-CR on Definitions for TR 22.848 |
pCR revised to S1-231500 |
Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231159 | Work Plan for Interconnect of SNPN | other | Novamint (as rapporteur of study on Interconnect of SNPN) |
S1-102 AI: 7.12 |
noted | [WTS] [JSN] | |||
S1-231160 | Update of the Use Case on Authorization of Avatar Usage Rights |
pCR revised to S1-231353 |
China Mobile, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231161 | Use case: Fire Alarm Notification and Emergency Contact | pCR | IPLOOK | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231162 | pCR on update of 5.7 AR Enabled Immersive Experience |
pCR revised to S1-231583 |
vivo | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231163 | pCR on update of 5.12 Virtual humans in metaverse |
pCR revised to S1-231585 |
vivo | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231164 | pCR on update of Annex C Energy Efficiency of Content Delivery for Metaverse Media Communication |
pCR revised to S1-231591 |
vivo | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231165 | Resolve EN regarding motion rate accuracy |
pCR revised to S1-231427 |
vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231166 | Resolve ambiguity on sensing assistance information and contextual information |
pCR revised to S1-231424 |
vivo, Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231167 | To enable UE using sensing result |
pCR revised to S1-231425 |
vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231168 | Consolidated KPI table | pCR | vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231169 | Discussion on KPI consolidation and CPR grouping | pCR | vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231170 | Transportation convenience service for the passengers for the reduced mobility |
discussion revised to S1-231373 |
Kyonggi University, KT | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] | |
S1-231171 | Multiple concurrent mobility services |
discussion revised to S1-231374 |
Kyonggi University, KT | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] | |
S1-231172 | New WID on Preventing Excessive Data Exposure within an NPN |
WID new revised to S1-231389 |
China Telecom |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231173 | Pseudo-CR on updates to clause 5.2 | pCR | Huawei, Tencent | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231174 | Discussion on Preventing Excessive Data Exposure within an NPN | discussion | China Telecom |
S1-102 AI: 4 |
noted | [WTS] [JSN] | |||
S1-231175 | Use Case on traffic duplication for a set of devices |
pCR revised to S1-231603 |
NEC | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231176 | Add requirements on preventing excessive data exposure within an NPN |
CR revised to S1-231390 |
China Telecom | 22.261 19.2.0 CR#688 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231177 | Minor editorial update of some definitions | CR | Kyonggi University, KT | 22.989 19.2.0 CR#24 catD | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] |
S1-231178 | Minor editorial update of some references | CR | Kyonggi University, KT | 22.989 19.2.0 CR#25 catD | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
noted | [WTS] [JSN] |
S1-231179 | Pseudo-CR on aligning energy-related terminology | pCR | Nokia, Nokia Shanghai Bell | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231180 | Pseudo-CR on adding reference to carbon-emission calculations | pCR | Nokia, Nokia Shanghai Bell | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231181 | New UC on pooling coverage layers for EE |
pCR revised to S1-231540 |
Nokia, Nokia Shanghai Bell | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231182 | Definition alignment of TR 22.851 | pCR | China Unicom | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] |
S1-231183 | LS to CT1 (cc SA2) on [Draft] Reply LS on periodic attempts for re-selection to a higher priority |
LS out revised to S1-231355 |
Qualcomm [SA1] | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231184 | LS to CT1, RAN2 (cc SA2, RAN3) on Draft Reply LS on method for Time Synchronization status reporting to | LS out | Qualcomm [SA1] | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | ||
S1-231185 | New access category for time synchronization access | CR | Qualcomm | 22.261 18.9.0 CR#689 catC | TEI18 | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] |
S1-231186 | LS to CT1 (cc SA2) on Draft Reply LS on access to stand-alone non-public network services via | LS out | Qualcomm [SA1] | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | ||
S1-231187 | Initial consolidation proposal for FS_DualSteer |
other revised to S1-231356 |
Qualcomm | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] | |
S1-231188 | pCR for FS_DualSteer Consolidated requirements |
pCR revised to S1-231604 |
Qualcomm | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231189 | Pseudo-CR on TR updates and clean-up |
pCR revised to S1-231600 |
Qualcomm | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231190 | Pseudo-CR on TR conclusions |
pCR revised to S1-231606 |
Qualcomm | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231191 | Update of clause 5.2 |
pCR revised to S1-231430 |
Huawei | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231192 | TR Cover page_for approval |
TS or TR cover revised to S1-231801 |
Qualcomm | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] | |
S1-231193 | Discussion on FS_Sensing Potential Requirements Consolidation | discussion | Huawei | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] | ||
S1-231194 | New WID on Upper layer traffic steering, switching and splitting over dual 3GPP access |
WID new revised to S1-231357 |
Qualcomm Tech. Netherlands B.V | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231195 | Discussion on KPI consolidation | discussion | Huawei |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] | |||
S1-231196 | Use Case on UAV traffic over alternative networks |
pCR revised to S1-231358 |
Qualcomm, Futurewei, Lockheed Martin, InterDigital | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231197 | Use Case on UAV simultaneous traffic over two networks |
pCR revised to S1-231359 |
Qualcomm, Futurewei, InterDigital, Lockheed Martin | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231198 | Use Case on UAV control in different aerial flight zones |
pCR revised to S1-231611 |
Qualcomm | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231199 | Pseudo-CR on Updating use case 5.4 | pCR | Qualcomm, Futurewei | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
merged | [WTS] [JSN] |
S1-231200 | Human readable service name - Overview |
other revised to S1-231360 |
Qualcomm | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231201 | New WID on Human readable name for network service |
WID new revised to S1-231361 |
Qualcomm, Nokia, Nokia Shanghai Bell, FirstNet, Verizon UK Ltd, Thales | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231202 | Human readable name for netwok service | CR | Qualcomm, Nokia, Nokia Shanghai Bell, FirstNet, Verizon UK Ltd, Thales | 22.261 19.2.0 CR#690 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] |
S1-231203 | LS on Metaverse requirements and KPIs | LS out | Nokia, Nokia Shanghai Bell | Rel-19 |
S1-102 AI: 3 |
withdrawn | [WTS] [JSN] | ||
S1-231204 | LS to Metaverse Standards Forum (MSF) Network Requirements and Capabilities Domain Working Group on LS on Metaverse requirements and KPIs |
LS out revised to S1-231596 |
Nokia, Nokia Shanghai Bell | Rel-19 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231205 | Correction to MPS requirements | CR | Qualcomm | 22.153 18.1.0 CR#59 catF | MPS_WLAN | Rel-18 |
S1-102 AI: 6.1 |
agreed | [WTS] [JSN] |
S1-231206 | Correction to MPS requirements | CR | Qualcomm | 22.153 19.0.0 CR#60 catA | MPS_WLAN | Rel-19 |
S1-102 AI: 6.1 |
agreed | [WTS] [JSN] |
S1-231207 | LS to ITU-T Focus Group on metaverse (FG-MV) (cc SA4) on Reply LS on requesting collaboration on metaverse standardization work |
LS out revised to S1-231385 |
Nokia, Nokia Shanghai Bell |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |||
S1-231208 | 22.865 pCR: Updates in use case 5.4 to highlight S&F mode | pCR | Nokia | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231209 | Pseudo-CR on editorial modifications of FS_Sensing | pCR | Deutsche Telekom AG, NTIA | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231210 | Use Case on Reducing GHG Footprint of Application Services |
pCR revised to S1-231541 |
MediaTek Inc. | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231211 | Use case on communication service with carbon-aware service requirements |
pCR revised to S1-231542 |
MediaTek Inc. | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231212 | Use case on communication service with best-effort renewable energy usage |
pCR revised to S1-231543 |
MediaTek Inc. | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231213 | Addressing ENs on use case 5.17 |
pCR revised to S1-231580 |
NTT DOCOMO | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231214 | Editorial update proposal on use case 5.17 |
pCR revised to S1-231581 |
NTT DOCOMO | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231215 | LS to CT1 (cc SA2) on Draft Reply LS on periodic attempts for re-selection to a higher priority SNPN when | LS out | MediaTek Inc. | Rel-18 |
S1-102 AI: 3 |
merged | [WTS] [JSN] | ||
S1-231216 | pCR on resolving EN in 5.8 | pCR | Lenovo | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231217 | Aligning the RAN sharing related definitions for quality improvement |
CR revised to S1-231393 |
Huawei, Nokia, Nokia Shanghai Bell, ZTE, China Unicom | 22.101 18.4.0 CR#588 catF | TEI18 | Rel-18 |
S1-102 AI: 5 |
revised | [WTS] [JSN] |
S1-231218 | New WID on supporting of edge computing for cloud phone |
WID new revised to S1-231391 |
China Telecom | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231219 | Discussion paper on Supporting of Edge Computing for Cloud Phone | discussion | China Telecom | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] | ||
S1-231220 | Additional requirements for selecting and/or changing the user plane paths based on the load of the Service Hosting Environment |
CR revised to S1-231392 |
China Telecom, ZTE | 22.261 19.2.0 CR#691 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231221 | Pseudo-CR on edge computing in CCRC |
pCR revised to S1-231547 |
China Telecom | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231222 | Discussion on FS_Metaverse Potential Requirements Consolidation | discussion | Huawei | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
noted | [WTS] [JSN] | |
S1-231223 | Discussion on Consolidated requirements of FS_5GSAT_Ph3 | discussion | CATT | Rel-19 |
S1-102 AI: 7.7 |
merged | [WTS] [JSN] | ||
S1-231224 | pCR on the skeleton of Consolidated Potential Requirements | pCR | CATT | 22.865 0.3.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
merged | [WTS] [JSN] |
S1-231225 | Pseudo-CR on Update KPI of Use case 5.28 |
pCR revised to S1-231437 |
DENSO CORPORATION | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231226 | Pseudo-CR on Update of Use case 5.30 to Resolve EN | pCR | DENSO CORPORATION | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
merged | [WTS] [JSN] |
S1-231227 | Pseudo-CR on Updates to Clause 5.21 | pCR | Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231228 | Clarification about LPHAP | CR | Xiaomi, Inspur | 22.104 18.3.0 CR#95 catF | LPHAP | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] |
S1-231229 | Pseudo-CR on update of use case 5.10 in TR 22.837 |
pCR revised to S1-231348 |
KPN | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231230 | Clarification about LPHAP | CR | Xiaomi, Inspur | 22.104 19.0.0 CR#96 catA | LPHAP | Rel-19 |
S1-102 AI: 3 |
noted | [WTS] [JSN] |
S1-231231 | pCR on updating use case 5.2 Supporting UAV flight preparation |
pCR revised to S1-231617 |
Deutsche Telekom, Nokia, Futurewei, InterDigital | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231232 | 22.856 pCR Clean Up | pCR | Samsung (Rapporteur) | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231233 | LS to SA2 (cc RAN1, RAN2) on Reply LS on the requirement on low power or high accuracy positioning | LS out | Xiaomi | LPHAP | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | |
S1-231234 | Pseudo-CR for update the KPI table in 5.23 |
pCR revised to S1-231375 |
ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231235 | Pseudo-CR on updating the PR in the use case on store and forward emergency report |
pCR revised to S1-231574 |
Xiaomi | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231236 | LS to CT1 on Reply LS on SENSE for home PLMN and disaster roaming PLMN |
LS out revised to S1-231804 |
[DRAFT] Apple |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |||
S1-231237 | Pseudo-CR for update the KPI table in 5.12 | pCR | ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231238 | Pseudo-CR on Changing Ranging to relative positioning in the use case 10 |
pCR revised to S1-231408 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231239 | Clarification on selection of Forbidden PLMN during Disaster Conditions when Operator controlled signal threshold applies |
CR revised to S1-231371 |
Apple | 22.011 18.4.0 CR#350 catF | MINT, SENSE | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] |
S1-231240 | Clarification on selection of Forbidden PLMN during Disaster Conditions when Operator controlled signal threshold applies |
CR revised to S1-231372 |
Apple | 22.011 19.0.0 CR#351 catA | MINT, SENSE | Rel-19 |
S1-102 AI: 3 |
revised | [WTS] [JSN] |
S1-231241 | Pseudo-CR on deletion of digitally stored information in the use case 29 |
pCR revised to S1-231412 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231242 | Pseudo-CR on Sensing Signals Terminology Update |
pCR revised to S1-231423 |
Apple | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231243 | Pseudo-CR on Potential new requirements for Geofencing for Visual Line-of-Sight UAV missions |
pCR revised to S1-231614 |
Orange | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231244 | Pseudo-CR on removing the FFS of LCS KPI values in the use case 9 |
pCR revised to S1-231407 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231245 | Pseudo-CR on resolving the FFS about efficiency in the use case 15 |
pCR revised to S1-231460 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231246 | Pseudo-CR on resolving the FFS about relay in the use case 27 |
pCR revised to S1-231441 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231247 | Resolving Editor s Notes in the Supporting multi-service coordination in one mobile metaverse service Use Case | pCR | InterDigital Inc. | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
merged | [WTS] [JSN] |
S1-231248 | Pseudo-CR on resolving the timer FFS in the use case 28 |
pCR revised to S1-231442 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231249 | Pseudo-CR on the additional security requirement in the use case 5 | pCR | Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231250 | Update to the Traffic Scenario on Flower Auction | pCR | InterDigital Inc. | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231251 | Consolidation on KPI for Ambient IoT |
pCR revised to S1-231678 |
OPPO, CMCC, Futurewei, vivo, Huawei? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231252 | LS to SA5 (cc GSMA ENSWI, SA) on Reply LS on customer acceptance of limited QoS degradation to save | LS out | Nokia, Nokia Shanghai Bell | FS_EE5G_Ph2 | Rel-18 |
S1-102 AI: 3 |
merged | [WTS] [JSN] | |
S1-231253 | pCR on removal of comparison operators in the KPI table |
pCR revised to S1-231404 |
OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231254 | New WID on Ambient power-enabled Internet of Things |
WID new revised to S1-231420 |
OPPO | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231255 | Use case for prioritizing home RAN over partner operator s RAN |
pCR revised to S1-231505 |
CableLabs, Comcast | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231256 | pCR on use case for Geofencing for Visual Line-of-Sight UAV missions |
pCR revised to S1-231613 |
China Mobile Com. Corporation (CMCC) | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231257 | pCR on updates on use case for network-assisted UAV DAA |
pCR revised to S1-231612 |
China Mobile Com. Corporation (CMCC) | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231258 | pCR on Abbreviations section | pCR | China Mobile | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231259 | pCR on FS-UAV-Ph3_Overview section |
pCR revised to S1-231607 |
China Mobile | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231260 | LS to SA5 (cc SA, RAN, CT, SA1, SA2, SA3, SA4, SA6, RAN1, RAN2, RAN3, RAN4, CT3, CT4) on Reply LS on 3GPP work on Energy Efficiency |
LS out revised to S1-231378 |
Nokia, Nokia Shanghai Bell | EE5GPLUS_Ph2 | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |
S1-231261 | pCR on consolidated requirements on for UAV Phase 3 |
pCR revised to S1-231381 |
China Mobile, Nokia | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231262 | TR 22.843 coversheet for SA approval |
TS or TR cover revised to S1-231798 |
China Mobile Com. Corporation | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] | |
S1-231263 | New WID on UAV Phase 3 |
WID new revised to S1-231380 |
SA1 | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231264 | MPS for Messaging when access is WLAN |
CR revised to S1-231627 |
Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | 22.153 19.0.0 CR#61 catB | MPS4msg | Rel-19 |
S1-102 AI: 7.13 |
revised | [WTS] [JSN] |
S1-231265 | Change of abbreviation of DN from Destination Network to Data Network | draftCR | Huawei Technologies Sweden AB | TEI14 | Rel-14 |
S1-102 AI: 5 |
noted | [WTS] [JSN] | |
S1-231266 | New WID on MPS for Dual Connectivity and Multiple Access Technologies | WID new | Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] | ||
S1-231267 | Dual Connectivity and Multiple Access Technologies |
CR revised to S1-231472 |
Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | 22.153 19.0.0 CR#62 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231268 | LS to SA3, SA2 (cc SA) on LS on Roaming architecture updates | LS out | Vodafone | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | ||
S1-231269 | pCR on KPIs for Ambient IoT traffic scenario on Electronic Shelf Label |
pCR revised to S1-231443 |
OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231270 | Correction of requirement in subclause 6.3 (Multiple access technologies) | CR | Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | 22.261 16.16.0 CR#692 catF | TEI16 | Rel-16 |
S1-102 AI: 6.3 |
noted | [WTS] [JSN] |
S1-231271 | pCR on reference to EPC Tag Data Standard |
pCR revised to S1-231402 |
OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231272 | Correction of requirement in subclause 6.3 (Multiple access technologies) | CR | Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | 22.261 17.11.0 CR#693 catA | TEI17 | Rel-17 |
S1-102 AI: 6.3 |
noted | [WTS] [JSN] |
S1-231273 | Pseudo-CR on resolving the Editor s Note in the Use case for out-of-coverage 5G Wireless sensing for automotive maneuvering and navigation service |
pCR revised to S1-231362 |
Huawei | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231274 | Pseudo-CR on removing the Editor s Note in the Use case of Sensing for Parking Space Determination | pCR | Huawei | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231275 | LS to CT1 (cc SA2) on Reply LS on periodic attempts for re-selection to a higher priority SNPN | LS out | SA1 | eNPN_Ph2 | Rel-18 |
S1-102 AI: 3 |
merged | [WTS] [JSN] | |
S1-231276 | Pseudo-CR on quality improvements to FS_UAV_ph3 TR 22.843 |
pCR revised to S1-231608 |
Huawei | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231277 | Pseudo-CR on quality improvements to FS_EnergyServ TR 22.882 | pCR | Huawei | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231278 | Pseudo-CR on quality improvements to FS_SOBOT TR 22.916 |
pCR revised to S1-231535 |
Huawei | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231279 | Change of abbreviation of DN from Destination Network to Data Network | draftCR | Huawei | TEI14 | Rel-15 |
S1-102 AI: 5 |
noted | [WTS] [JSN] | |
S1-231280 | Change of abbreviation of DN from Destination Network to Data Network | draftCR | Huawei | TEI14 | Rel-16 |
S1-102 AI: 5 |
noted | [WTS] [JSN] | |
S1-231281 | Change of abbreviation of DN from Destination Network to Data Network | draftCR | Huawei | TEI14 | Rel-17 |
S1-102 AI: 5 |
noted | [WTS] [JSN] | |
S1-231282 | Correction of requirement in subclause 6.3 (Multiple access technologies) | CR | Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | 22.261 18.9.0 CR#694 catA | TEI18 | Rel-18 |
S1-102 AI: 6.3 |
noted | [WTS] [JSN] |
S1-231283 | Correction of requirement in subclause 6.3 (Multiple access technologies) | CR | Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | 22.261 19.2.0 CR#695 catA | TEI18 | Rel-19 |
S1-102 AI: 6.3 |
noted | [WTS] [JSN] |
S1-231284 | Pseudo-CR to add the position KPI for 5.11 |
pCR revised to S1-231409 |
ZTE | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231285 | LS to CT1, RAN2 (cc SA2, RAN3) on Response to Reply LS on Proposed method for Time Synchronization |
LS out LS To: CT1, RAN2 |
SA1 | TRS_URLLC | Rel-18 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | |
S1-231286 | Pseudo-CR Ambient IoT square brackets removal for smart grazing dairy farming s Communication Range KPI value |
pCR revised to S1-231414 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231287 | Pseudo-CR Ambient IoT Clause 5.24 square brackets removal for smart manhole cover safety monitoring s Communication Range KPI value |
pCR revised to S1-231415 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231288 | Pseudo-CR Ambient IoT clause 5.25 square brackets removal for smart bridge health monitoring s Communication Range KPI value |
pCR revised to S1-231416 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231289 | LS to SA2 (cc RAN1, RAN2) on Reply LS on the requirement on low power or high accuracy positioning |
LS out revised to S1-231370 |
SA1 | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231290 | Pseudo-CR on FS_Ambient IoT adding missing Device Speed KPI values to align with captured intentions of respective use cases |
pCR revised to S1-231403 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231291 | Pseudo-CR on FS_Ambient IoT, remove Editor s Note by adding KPIs to clause 5.16 automated supply chain distribution |
pCR revised to S1-231411 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231292 | Pseudo-CR on FS_Ambient IoT, remove Editor s Note from clause 5.5 intralogistics in automobile manufacturing | pCR | Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231293 | Pseudo-CR on FS_Ambient IoT, Device Speed terminology alignment replacing static with stationary | pCR | Huawei, ZTE, vivo | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231294 | Pseudo-CR on modifications for consistent use of terminology in FS_Sensing |
pCR revised to S1-231426 |
Deutsche Telekom AG, Nokia, Ericsson | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231295 | Pseudo-CR on FS_Ambient IoT, update KPI Device Density to clause 5.8 Finding Remote Lost Item |
pCR revised to S1-231682 |
Huawei, Qualcomm? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231296 | Pseudo-CR on FS_Ambient IoT, update KPI Device Density to clause 5.26 Elderly Health Care |
pCR revised to S1-231417 |
Huawei, Vodafone? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231297 | Pseudo-CR on FS_Ambient IoT, update Max. allowed end-to-end latency KPI of clause 5.2 Medical Instrument Inventory management |
pCR revised to S1-231401 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231298 | Pseudo-CR on FS_Ambient IoT, update Max. allowed end-to-end latency KPI of clause 5.5 intralogistics in automobile manufacturing |
pCR revised to S1-231683 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231299 | Pseudo-CR on FS_Ambient IoT, update Max. allowed end-to-end latency KPI of clause 5.11 medical instruments status modification | pCR | Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
merged | [WTS] [JSN] |
S1-231300 | Pseudo-CR on FS_Ambient IoT, update Transfer Interval KPI table of clause 5.18 Fresh Food Supply Chain | pCR | Huawei,Wiliot | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231301 | Update to the Use Case Asynchronous FL via direct device connection |
pCR revised to S1-231509 |
InterDigital Inc. | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] |
S1-231302 | TR 22865 Cover page for approval | TS or TR cover | NOVAMINT | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] | |
S1-231303 | Pseudo-CR on the definition of refreshing rate |
pCR revised to S1-231428 |
Xiaomi | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231304 | Notification of updated list of participants of Ad hoc Group Emergency Alert |
CR revised to S1-231327 |
Union Internationale des Chemins de Fer | 22.28 18.3.0 CR#161 catC | AHGC | Rel-18 |
S1-102 AI: 6.1 |
revised | [WTS] [JSN] |
S1-231305 | Notification of updated list of participants of Ad hoc Group Emergency Alert | CR | Union Internationale des Chemins de Fer | 22.28 19.1.0 CR#162 catA | DUMMY | Rel-19 |
S1-102 AI: 7.13 |
withdrawn | [WTS] [JSN] |
S1-231306 | Adding note to not exclude solution | pCR | Ericsson, Deutsche Telekom, Nokia | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231307 | Pseudo-CR on update of sensing KPI s | pCR | Ericsson, Deutsche Telekom, Nokia | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231308 | sensing in out of coverage scenario | pCR | Ericsson | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231309 | Notification of updated list of participants of Ad hoc Group Emergency Alert |
CR revised to S1-231328 |
UIC, | 22.28 19.1.0 CR#163 catA | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 6.1 |
revised | [WTS] [JSN] |
S1-231310 | Usage of multi-talker control for Ad hoc Group Emergency Voice Communications |
CR revised to S1-231329 |
UIC | 22.179 17.1.0 CR#76 catC | FS_FRMCS_Ph5 | Rel-17 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231311 | Skeleton for new WID on Sensing - if new TS would be needed | other | Deutsche Telekom AG | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | ||
S1-231312 | Pseudo-CR on New CPR for Management of Ambient IoT device | pCR | Sharp, Apple | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
merged | [WTS] [JSN] |
S1-231313 | Pseudo-CR on introducing overview section of FS_Sensing | pCR | Deutsche Telekom AG | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231314 | Pseudo-CR on Revised CPR for Management of Ambient IoT device | pCR | Sharp | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
merged | [WTS] [JSN] |
S1-231315 | Clean-up of Railway Emergency Communication related use cases | CR | UIC | 22.989 19.2.0 CR#26 catF | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] |
S1-231316 | Sensing overview proposal | discussion | Xiaomi Communications | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
merged | [WTS] [JSN] | |
S1-231317 | Discussion on consolidated requirements of FS_Sensing |
discussion revised to S1-231367 |
Deutsche Telekom, ZTE | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | ||
S1-231318 | Pseudo-CR on Consolidated requirements of FS_Sensing |
pCR revised to S1-231368 |
Deutsche Telekom AG, ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231319 | Update on 5.1 Online cooperative high-resolution 3D map building |
pCR revised to S1-231536 |
LG Electronics | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231320 | SOBOT Use Case: MEC for Efficient Management of Geo-surface Sensing Data Using a Group of Aerial Robots |
pCR revised to S1-231397 |
LG Electronics | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231321 | Update on 5.3 Smart Communication Support for Data Collection and Fusion Using Multimodal Sensors in Multi-Robot / Multi-Agent Scenarios |
pCR revised to S1-231802 |
LG Electronics | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231322 | Sensing and Security / Privacy Aspects | discussion | Apple |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] | |||
S1-231323 | Adding privacy requirement on minimizing exposure of personally identifiable information |
pCR revised to S1-231438 |
Philips International B.V. | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231324 | pCR to add a PR on sensing service availability information |
pCR revised to S1-231431 |
Lenovo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231325 | pCR to clarify potential mobility of a sensing RAN node |
pCR revised to S1-231429 |
Lenovo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231326 | pCR to clarify non-3GPP sensing data provided by a network node | pCR | Lenovo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231327 | Notification of updated list of participants of Ad hoc Group Emergency Alert |
CR revision of S1-231304 revised to S1-231399 |
UIC | 22.28 18.3.0 CR#1611 catC | AHGC | Rel-18 |
S1-102 AI: 6.1 |
revised | [WTS] [JSN] |
S1-231328 | Notification of updated list of participants of Ad hoc Group Emergency Alert |
CR revision of S1-231309 revised to S1-231640 |
UIC | 22.28 19.1.0 CR#1631 catA | AHGC | Rel-19 |
S1-102 AI: 6.1 |
revised | [WTS] [JSN] |
S1-231329 | Usage of multi-talker control for Ad hoc Group Emergency Voice Communications |
CR revision of S1-231310 |
UIC | 22.179 17.1.0 CR#761 catC | DUMMY | Rel-17 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231330 | Cover sheet of the TR22.837 for approval |
TS or TR cover revised to S1-231815 |
Rapporteur (Deutsche Telekom) | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | |
S1-231331 | TR 22.837v1.1.0 Study on Integrated Sensing and Communication | draft TR | Rapporteur (Deutsche Telekom) | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] | |
S1-231332 | Cover sheet of the TR22.840 for approval | TS or TR cover | Rapporteur (OPPO) | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] | |
S1-231333 | TR 22.840v1.2.0 Study on Ambient power-enabled Internet of Things | draft TR | Rapporteur (OPPO) | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] | |
S1-231334 | TR 22.856v1.1.0 Study on Localized Mobile Metaverse Services | draft TR | Rapporteur (Samsung) | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] | |
S1-231335 | Cover sheet of the TR22.851 for approval |
TS or TR cover revised to S1-231796 |
Rapporteur (China Unicom) | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] | |
S1-231336 | TR 22.851v1.2.0 Study on Network Sharing Aspects | draft TR | Rapporteur (China Unicom) | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] | |
S1-231337 | Cover sheet of the TR22.876 for approval |
TS or TR cover revised to S1-231814 |
Rapporteur (OPPO) | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] | |
S1-231338 | TR 22.876v1.1.0 Study on AI/ML Model Transfer_Phase2 | draft TR | Rapporteur (OPPO) | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
agreed | [WTS] [JSN] | |
S1-231339 | TR 22.865v1.1..0 Study on Satellite Access Phase 3 | draft TR | Rapporteur (NOVAMINT) | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] | |
S1-231340 | TR 22.841v1.1.0 Study on Upper layer traffic steering, switching and split over dual 3GPP access | draft TR | Rapporteur (Qualcomm) | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
agreed | [WTS] [JSN] | |
S1-231341 | TR 22.882v1.1.0 Study on Energy Efficiency as service criteria | draft TR | Rapporteur (China Mobile) | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] | |
S1-231342 | TR 22.916v0.4.0 Study on Network of Service Robots with Ambient Intelligence | draft TR | Rapporteur (LGE) | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
agreed | [WTS] [JSN] | |
S1-231343 | TR 22.848v0.1.0 Study on Interconnect of SNPN | draft TR | Rapporteur (NOVAMINT) | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
agreed | [WTS] [JSN] | |
S1-231344 | Requirements Consolidation- Further Aspects |
pCR revision of S1-231019 revised to S1-231506 |
ZTE | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231345 | LS to SA5 (cc GSMA ENSWI, SA) on [DRAFT] Reply LS on customer acceptance of limited QoS degradation to |
LS out revised to S1-231376 |
China Mobile | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231346 | Discussion on UE-to-UE multi hop relay |
discussion revision of S1-231042 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L’Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] | ||
S1-231347 | TR 22.843v1.1.0 Study on UAV Phase 3 | draft TR | Rapporteur (China Mobile) | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] | |
S1-231348 | Pseudo-CR on update of use case 5.10 in TR 22.837 |
pCR revision of S1-231229 revised to S1-231432 |
KPN N.V. | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231349 | pCR on Consolidation of potential KPI requirements of Sensing |
pCR revision of S1-231153 |
ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
merged | [WTS] [JSN] |
S1-231350 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231103 revised to S1-231369 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231351 | Ambient IoT functional CPR |
pCR revision of S1-231097 revised to S1-231444 |
OPPO (Rapporteur) | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231352 | Consolidation on Functional Requirement of AIML-Ph2 |
pCR revision of S1-231098 revised to S1-231510 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] |
S1-231353 | Update of the Use Case on Authorization of Avatar Usage Rights |
pCR revision of S1-231160 revised to S1-231588 |
China Mobile, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231354 | LS to CT1 on Reply on Reply LS on SENSE for home PLMN and disaster roaming PLMN |
LS out revision of S1-231073 |
vivo | Rel-18 |
S1-102 AI: 3 |
merged | [WTS] [JSN] | ||
S1-231355 | LS to CT1 (cc SA2) on [Draft] Reply LS on periodic attempts for re-selection to a higher priority |
LS out revision of S1-231183 |
Qualcomm [SA1] | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | ||
S1-231356 | Initial consolidation proposal for FS_DualSteer |
other revision of S1-231187 |
Qualcomm | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
noted | [WTS] [JSN] | |
S1-231357 | New WID on Upper layer traffic steering, switching and splitting over dual 3GPP access |
WID new revision of S1-231194 |
Qualcomm | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231358 | Use Case on UAV traffic over alternative networks |
pCR revision of S1-231196 revised to S1-231609 |
Qualcomm, Futurewei, Lockheed Martin, InterDigital | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231359 | Use Case on UAV simultaneous traffic over two networks |
pCR revision of S1-231197 revised to S1-231610 |
Qualcomm, Futurewei, InterDigital, Lockheed Martin | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231360 | Human readable service name - Overview |
other revision of S1-231200 |
Qualcomm | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] | ||
S1-231361 | New WID on Human readable name for network service |
WID new revision of S1-231201 |
Qualcomm, Nokia, Nokia Shanghai Bell, FirstNet, Verizon UK Ltd, Thales, Xiaomi, KDDI | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] | ||
S1-231362 | Pseudo-CR on resolving the Editor s Note in the Use case for out-of-coverage 5G Wireless sensing for automotive maneuvering and navigation service |
pCR revision of S1-231273 revised to S1-231484 |
Huawei, DENSO | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231363 | Pseudo-CR on consolidation of requirements on UE-based sensing when not served by RAN |
pCR revision of S1-231148 |
Qualcomm, Huawei, OPPO, Xiaomi, FirstNet | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231364 | Update to Use Case on Ambient IoT for airport terminal / shipping port |
pCR revision of S1-231150 revised to S1-231405 |
Qualcomm | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231365 | Update to Use Case on Finding Lost Item |
pCR revision of S1-231151 revised to S1-231406 |
Qualcomm, Futurewei, Wiliot, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231366 | LS to CT1 (cc SA2) on [Draft] LS on periodic attempts for re-selection to a higher priority SNPN |
LS out revision of S1-231096 revised to S1-231467 |
OPPO [to be SA1] | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231367 | Discussion on consolidated requirements of FS_Sensing |
discussion revision of S1-231317 revised to S1-231445 |
Deutsche Telekom, ZTE | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | ||
S1-231368 | Pseudo-CR on Consolidated requirements of FS_Sensing |
pCR revision of S1-231318 revised to S1-231490 |
Deutsche Telekom AG, ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231369 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231350 revised to S1-231384 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231370 | LS to SA2 (cc RAN1, RAN2) on Reply LS on the requirement on low power or high accuracy positioning |
LS out LS To: SA2 revision of S1-231289 |
SA1 | Rel-18 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | ||
S1-231371 | Clarification on selection of Forbidden PLMN during Disaster Conditions when Operator controlled signal threshold applies |
CR revision of S1-231239 |
Apple | 22.011 18.4.0 CR#3501 catF | MINT, SENSE | Rel-18 |
S1-102 AI: 3 |
agreed | [WTS] [JSN] |
S1-231372 | Clarification on selection of Forbidden PLMN during Disaster Conditions when Operator controlled signal threshold applies |
CR revision of S1-231240 |
Apple | 22.011 19.0.0 CR#3511 catA | MINT, SENSE | Rel-19 |
S1-102 AI: 3 |
agreed | [WTS] [JSN] |
S1-231373 | Transportation convenience service for the passengers for the reduced mobility |
CR revision of S1-231170 |
Kyonggi University, KT | 22.989 19.2.0 CR#27 catD | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] |
S1-231374 | Multiple concurrent mobility services |
CR revision of S1-231171 |
Kyonggi University, KT | 22.989 19.2.0 CR#28 catD | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] |
S1-231375 | pCR for KPI table update - 5.23 |
pCR revision of S1-231234 |
ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231376 | LS to SA5 (cc GSMA ENSWI, SA) on [DRAFT] Reply LS on customer acceptance of limited QoS degradation to |
LS out revision of S1-231345 revised to S1-231468 |
China Mobile | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231377 | LS to SA5 (cc SA6) on [DRAFT] Reply LS on Reply LS on DN energy efficiency |
LS out revision of S1-231133 revised to S1-231469 |
China Mobile | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231378 | LS to SA5 (cc SA, RAN, CT, SA1, SA2, SA3, SA4, SA6, RAN1, RAN2, RAN3, RAN4, CT3, CT4) on Reply LS on 3GPP work on Energy Efficiency |
LS out revision of S1-231260 revised to S1-231805 |
Nokia, Nokia Shanghai Bell | EE5GPLUS_Ph2 | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |
S1-231379 | LS to SA, SA3 (cc SA2, SA3, CT4) on LS on GSMA requirements regarding intermediaries in the roaming |
LS out revision of S1-231076 revised to S1-231470 |
Deutsche Telekom |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |||
S1-231380 | New WID on UAV Phase 3 |
WID new revision of S1-231263 revised to S1-231616 |
China Mobile Com. Corporation | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231381 | pCR on consolidated requirements on for UAV Phase 3 |
pCR revision of S1-231261 revised to S1-231615 |
China Mobile, Nokia | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231382 | Consolidation proposal for TR 22.865 |
discussion revision of S1-231086 |
Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom |
S1-102 AI: 7.7 |
noted | [WTS] [JSN] | |||
S1-231383 | Pseudo-CR on consolidated requirements for TR 22.865 |
pCR revision of S1-231087 |
Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231384 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231369 revised to S1-231693 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231385 | LS to ITU-T Focus Group on metaverse (FG-MV) (cc TSG SA WG4) on Reply LS on requesting collaboration on metaverse standardization work |
LS out revision of S1-231207 revised to S1-231471 |
3GPP TSG SA WG1 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |||
S1-231386 | UE-to-UE Multi-hop relay requirements for mission critical communications |
CR revision of S1-231044 revised to S1-231687 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital. | 22.261 19.2.0 CR#6811 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231387 | UE-to-UE multi-hop relay |
WID new revision of S1-231043 revised to S1-231718 |
FirstNet, SyncTechno Inc., Erillisverkot , Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital. | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231388 | UE-to-UE Multi-hop relay requirements for mission critical communications |
CR revision of S1-231045 revised to S1-231688 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital. | 22.28 19.1.0 CR#1601 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231389 | New WID on NPN security considerations Preventing Excessive Data Exposure within an NPN |
WID new revision of S1-231172 revised to S1-231781 |
China Telecom |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231390 | Add requirements on NPN security considerations |
CR revision of S1-231176 revised to S1-231629 |
China Telecom, Samsung | 22.261 19.2.0 CR#6882 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231391 | New WID on supporting of edge computing for cloud phone |
WID new revision of S1-231218 revised to S1-231557 |
China Telecom | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231392 | Additional requirements for selecting and/or changing the user plane paths based on the load of the Service Hosting Environment |
CR revision of S1-231220 revised to S1-231558 |
China Telecom, ZTE, Samsung | 22.261 19.2.0 CR#6911 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231393 | Aligning the RAN sharing related definitions for quality improvement |
CR revision of S1-231217 |
Huawei, Nokia, Nokia Shanghai Bell, ZTE, China Unicom | 22.101 18.4.0 CR#5881 catA | TEI15 | Rel-18 |
S1-102 AI: 5 |
agreed | [WTS] [JSN] |
S1-231394 | Clarification on AI-ML KPIs |
CR revision of S1-231083 revised to S1-231474 |
OPPO | 22.261 18.9.0 CR#6861 catF | DUMMY | Rel-18 |
S1-102 AI: 5 |
revised | [WTS] [JSN] |
S1-231395 | Clarification on AI-ML KPIs |
CR revision of S1-231082 revised to S1-231473 |
OPPO | 22.261 19.2.0 CR#6851 catF | DUMMY | Rel-19 |
S1-102 AI: 5 |
revised | [WTS] [JSN] |
S1-231396 | Corrections of scope and reference including editorial fixes |
CR revision of S1-231020 |
ETRI | 22.268 18.2.0 CR#781 catF | TEI18 | Rel-18 |
S1-102 AI: 6.1 |
agreed | [WTS] [JSN] |
S1-231397 | SOBOT Use Case: MEC for Efficient Management of Geo-surface Sensing Data Using a Group of Aerial Robots |
pCR revision of S1-231320 revised to S1-231546 |
LG Electronics | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231398 | UE based geo-fencing requirements for KPAS |
CR revision of S1-231124 |
ETRI, KT Corp, SK Telecom, LG Uplus | 22.268 18.2.0 CR#791 catB | TEI18 | Rel-18 |
S1-102 AI: 6.1 |
agreed | [WTS] [JSN] |
S1-231399 | Notification of updated list of participants of Ad hoc Group Emergency Alert |
CR revision of S1-231327 revised to S1-231475 |
UIC | 22.28 18.3.0 CR#1612 catC | AHGC | Rel-18 |
S1-102 AI: 6.1 |
revised | [WTS] [JSN] |
S1-231400 | Pseudo-CR to add the position KPI for 5.2 |
pCR revision of S1-231154 |
ZTE | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231401 | Pseudo-CR on FS_Ambient IoT, update Max. allowed end-to-end latency KPI of clause 5.2, and 5.11 Medical Instrument Inventory management |
pCR revision of S1-231297 |
Huawei, ZTE? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231402 | pCR on reference to EPC Tag Data Standard |
pCR revision of S1-231271 |
OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231403 | Pseudo-CR on FS_Ambient IoT adding missing Device Speed KPI values to align with captured intentions of respective use cases |
pCR revision of S1-231290 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231404 | pCR on removal of comparison operators in the KPI table |
pCR revision of S1-231253 revised to S1-231458 |
OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231405 | Update to Use Case on Ambient IoT for airport terminal / shipping port |
pCR revision of S1-231364 |
Qualcomm | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231406 | Update to Use Case on Finding Lost Item |
pCR revision of S1-231365 revised to S1-231485 |
Qualcomm, Futurewei, Wiliot, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231407 | Pseudo-CR on removing the FFS of LCS KPI values in the use case 9 |
pCR revision of S1-231244 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231408 | Pseudo-CR on Changing Ranging to relative positioning in the use case 10 |
pCR revision of S1-231238 revised to S1-231459 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231409 | Pseudo-CR to add the position KPI for 5.11 |
pCR revision of S1-231284 |
ZTE | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231410 | Update of Use case 5.12 |
pCR revision of S1-231078 |
vivo, OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231411 | Pseudo-CR on FS_Ambient IoT, remove Editor s Note by adding KPIs to clause 5.16 automated supply chain distribution |
pCR revision of S1-231291 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231412 | Pseudo-CR on deletion of digitally stored information in the use case 29 |
pCR revision of S1-231241 revised to S1-231486 |
Xiaomi, Sharp | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231413 | Power consumption descriptions for use case 24 and 25 |
pCR revision of S1-231079 |
vivo, Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231414 | Pseudo-CR Ambient IoT square brackets removal for smart grazing dairy farming s Communication Range KPI value |
pCR revision of S1-231286 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231415 | Pseudo-CR Ambient IoT Clause 5.24 square brackets removal for smart manhole cover safety monitoring s Communication Range KPI value |
pCR revision of S1-231287 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231416 | Pseudo-CR Ambient IoT clause 5.25 square brackets removal for smart bridge health monitoring s Communication Range KPI value |
pCR revision of S1-231288 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231417 | Pseudo-CR on FS_Ambient IoT, update KPI Device Density to clause 5.26 Elderly Health Care |
pCR revision of S1-231296 revised to S1-231461 |
Huawei, Vodafone? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231418 | Discussion on consolidated KPIs of FS_Sensing |
discussion revision of S1-231075 |
Deutsche Telekom AG, Nokia, Ericsson | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] | ||
S1-231419 | Pseudo-CR on Consolidated KPIs of FS_Sensing |
pCR revision of S1-231077 revised to S1-231492 |
Deutsche Telekom AG, Nokia, Ericsson | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231420 | New WID on Ambient power-enabled Internet of Things |
WID new revision of S1-231254 revised to S1-231457 |
OPPO | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231421 | Pseudo-CR on editorial modifications of FS_Sensing | pCR | Deutsche Telekom, NTIA | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231422 | Pseudo-CR on introducing overview section of FS_Sensing |
pCR revised to S1-231477 |
Deutsche Telekom AG, Xiaomi | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231423 | Pseudo-CR on Sensing Signals Terminology Update |
pCR revision of S1-231242 revised to S1-231689 |
Apple | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231424 | Resolve ambiguity on sensing assistance information |
pCR revision of S1-231166 revised to S1-231453 |
vivo, Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231425 | To enable UE using sensing result |
pCR revision of S1-231167 revised to S1-231454 |
vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231426 | Pseudo-CR on modifications for consistent use of terminology in FS_Sensing |
pCR revision of S1-231294 revised to S1-231481 |
Deutsche Telekom AG, Nokia, Ericsson | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231427 | Resolve EN on motion rate accuracy |
pCR revision of S1-231165 revised to S1-231455 |
vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231428 | Pseudo-CR on the definition of refreshing rate |
pCR revision of S1-231303 |
Xiaomi | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231429 | pCR to clarify potential mobility of a sensing RAN node |
pCR revision of S1-231325 |
Lenovo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231430 | Update of clause 5.2 |
pCR revision of S1-231191 revised to S1-231447 |
Huawei | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231431 | pCR to add a PR on sensing service availability information |
pCR revision of S1-231324 revised to S1-231448 |
Lenovo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231432 | Pseudo-CR on update of use case 5.10 in TR 22.837 |
pCR revision of S1-231348 |
KPN, Futurewei | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231433 | pCR on updating KPI for clause 5.14 |
pCR revision of S1-231116 revised to S1-231449 |
CMCC | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231434 | Update to Use Case of Seamless XR Streaming |
pCR revision of S1-231146 revised to S1-231760 |
Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231435 | Use Case # 24 update on sensing service authorization |
pCR revision of S1-231123 revised to S1-231450 |
Futurewei, Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231436 | Update to Use Case on Gesture Recognition for Application Navigation and Immersive Interaction |
pCR revision of S1-231147 revised to S1-231451 |
Qualcomm, CATT | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231437 | Pseudo-CR on Update KPI of Use case 5.28 |
pCR revision of S1-231225 |
DENSO CORPORATION | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231438 | Adding privacy requirement on minimizing exposure of personally identifiable information |
pCR revision of S1-231323 revised to S1-231452 |
Philips International B.V. | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231439 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231440 | Consolidation requirements on FS_EnergyServ |
pCR revision of S1-231128 revised to S1-231544 |
China Mobile, Samsung | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231441 | Pseudo-CR on resolving the FFS about relay in the use case 27 |
pCR revision of S1-231246 revised to S1-231462 |
Xiaomi, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231442 | Pseudo-CR on resolving the timer FFS in the use case 28 |
pCR revision of S1-231248 revised to S1-231463 |
Xiaomi, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231443 | pCR on KPIs for Ambient IoT traffic scenario on Electronic Shelf Label |
pCR revision of S1-231269 revised to S1-231464 |
OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231444 | Ambient IoT functional CPR |
pCR revision of S1-231351 revised to S1-231456 |
OPPO (Rapporteur) | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231445 | Discussion on consolidated requirements of FS_Sensing |
discussion revision of S1-231367 revised to S1-231479 |
Deutsche Telekom, ZTE | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | ||
S1-231446 | New WID on Integrated Sensing and Communication |
WID new revision of S1-231041 revised to S1-231559 |
Deutsche Telekom AG, Orange, Sharp Corporation, ZTE | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231447 | Update of clause 5.2 |
pCR revision of S1-231430 |
Huawei | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231448 | pCR to add a PR on sensing service availability information |
pCR revision of S1-231431 revised to S1-231483 |
Lenovo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231449 | pCR on updating KPI for clause 5.14 |
pCR revision of S1-231433 |
CMCC | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231450 | Use Case # 24 update on sensing service authorization |
pCR revision of S1-231435 |
Futurewei, Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231451 | Update to Use Case on Gesture Recognition for Application Navigation and Immersive Interaction |
pCR revision of S1-231436 |
Qualcomm, CATT | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231452 | Adding privacy requirement on minimizing exposure of personally identifiable information |
pCR revision of S1-231438 |
Philips International B.V. | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231453 | Resolve ambiguity on sensing assistance information |
pCR revision of S1-231424 revised to S1-231478 |
vivo, Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231454 | To enable UE using sensing result |
pCR revision of S1-231425 revised to S1-231480 |
vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231455 | Resolve EN on motion rate accuracy |
pCR revision of S1-231427 revised to S1-231482 |
vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231456 | Ambient IoT functional CPR |
pCR revision of S1-231444 |
OPPO (Rapporteur) | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231457 | New WID on Ambient power-enabled Internet of Things |
WID new revision of S1-231420 revised to S1-231493 |
OPPO |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231458 | pCR on removal of comparison operators in the KPI table |
pCR revision of S1-231404 |
OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231459 | Pseudo-CR on Changing Ranging to relative positioning in the use case 10 |
pCR revision of S1-231408 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231460 | Pseudo-CR on resolving the FFS about efficiency in the use case 15 |
pCR revision of S1-231245 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231461 | Pseudo-CR on FS_Ambient IoT, update KPI Device Density to clause 5.26 Elderly Health Care |
pCR revision of S1-231417 |
Huawei, Vodafone? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231462 | Pseudo-CR on resolving the FFS about relay in the use case 27 |
pCR revision of S1-231441 revised to S1-231488 |
Xiaomi, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231463 | Pseudo-CR on resolving the timer FFS in the use case 28 |
pCR revision of S1-231442 revised to S1-231489 |
Xiaomi, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231464 | pCR on KPIs for Ambient IoT traffic scenario on Electronic Shelf Label |
pCR revision of S1-231443 |
OPPO | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231465 | Initial considerations about Rel-20 calendar |
other revision of S1-231011 revised to S1-231466 |
SA1 Chair & ETSI MCC |
S1-102 AI: 2 |
revised | [WTS] [JSN] | |||
S1-231466 | Initial considerations about Rel-20 calendar |
other revision of S1-231465 |
SA1 Chair & ETSI MCC |
S1-102 AI: 2 |
withdrawn | [WTS] [JSN] | |||
S1-231467 | LS to CT1 (cc SA2) on LS on periodic attempts for re-selection to a higher priority SNPN when |
LS out revision of S1-231366 revised to S1-231752 |
OPPO | Rel-18 |
S1-102 AI: 3 |
revised | [WTS] [JSN] | ||
S1-231468 | LS to SA5 (cc GSMA ENSWI, SA) on Reply LS on customer acceptance of limited QoS degradation to save |
LS out LS To: SA5 revision of S1-231376 |
3GPP SA1 | Rel-18 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | ||
S1-231469 | LS to SA5 (cc SA6) on Reply LS on Reply LS on DN energy efficiency |
LS out LS To: SA5 revision of S1-231377 |
3GPP SA1 | Rel-18 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | ||
S1-231470 | LS to SA, SA3 (cc SA2, CT4) on LS on GSMA requirements regarding intermediaries in the roaming |
LS out revision of S1-231379 revised to S1-231776 |
Deutsche Telekom |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |||
S1-231471 | LS to ITU-T Focus Group on metaverse (FG-MV) (cc TSG SA WG4) on Reply LS on requesting collaboration on metaverse standardization work |
LS out revision of S1-231385 revised to S1-231753 |
Nokia, Nokia Shanghai Bell |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |||
S1-231472 | Multiple Access Technologies |
CR revision of S1-231267 revised to S1-231756 |
Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | 22.153 19.0.0 CR#621 catB | TEI19, MPS_WLAN | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231473 | Clarification on AI-ML KPIs |
CR revision of S1-231395 |
OPPO | 22.261 19.2.0 CR#6852 catA | AIML_MT | Rel-19 |
S1-102 AI: 5 |
agreed | [WTS] [JSN] |
S1-231474 | Clarification on AI-ML KPIs |
CR revision of S1-231394 |
OPPO | 22.261 18.9.0 CR#6862 catF | AIML_MT | Rel-18 |
S1-102 AI: 5 |
agreed | [WTS] [JSN] |
S1-231475 | Notification of updated list of participants of Ad hoc Group Emergency Alert |
CR revision of S1-231399 |
Union Internationale des Chemins de Fer | 22.28 18.3.0 CR#1613 catC | AHGC | Rel-18 |
S1-102 AI: 6.1 |
agreed | [WTS] [JSN] |
S1-231476 | Supporting UE Mobility for XR service |
CR revision of S1-231131 |
China Mobile | 22.261 19.2.0 CR#6871 catB | XRMobility | Rel-19 |
S1-102 AI: 7.13 |
noted | [WTS] [JSN] |
S1-231477 | Pseudo-CR on introducing overview section of FS_Sensing |
pCR revision of S1-231422 revised to S1-231759 |
Deutsche Telekom AG, Xiaomi | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231478 | Resolve ambiguity on sensing assistance information and contextual information |
pCR revision of S1-231453 |
vivo, Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231479 | Discussion on consolidated requirements of FS_Sensing |
discussion revision of S1-231445 revised to S1-231496 |
Deutsche Telekom, ZTE |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | |||
S1-231480 | To enable UE using sensing result |
pCR revision of S1-231454 |
vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231481 | Pseudo-CR on modifications for consistent use of terminology in FS_Sensing |
pCR revision of S1-231426 |
Deutsche Telekom AG, Nokia, Ericsson | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231482 | Resolve EN regarding motion rate accuracy |
pCR revision of S1-231455 |
vivo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231483 | pCR to add a PR on sensing service availability information |
pCR revision of S1-231448 |
Lenovo | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231484 | Pseudo-CR on resolving the Editor s Note in the Use case for out-of-coverage 5G Wireless sensing for automotive maneuvering and navigation service |
pCR revision of S1-231362 revised to S1-231786 |
Huawei, DENSO | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231485 | Update to Use Case on Finding Lost Item |
pCR revision of S1-231406 revised to S1-231785 |
Qualcomm, Futurewei, Wiliot, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231486 | Pseudo-CR on deletion of digitally stored information in the use case 29 |
pCR revision of S1-231412 revised to S1-231764 |
Xiaomi, Sharp | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231487 | Ambient IoT functional CPR |
pCR revised to S1-231788 |
OPPO (Rapporteur) | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231488 | Pseudo-CR on resolving the FFS about relay in the use case 27 |
pCR revision of S1-231462 revised to S1-231765 |
Xiaomi, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231489 | Resolving the timer FFS in the use case 28 |
pCR revision of S1-231463 |
Xiaomi | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
withdrawn | [WTS] [JSN] |
S1-231490 | Pseudo-CR on Consolidated requirements of FS_Sensing |
pCR revision of S1-231368 revised to S1-231495 |
Deutsche Telekom AG, ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231491 | Pseudo-CR on Consolidated requirements of FS_Sensing - Part 2 | pCR | Deutsche Telekom AG, ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
withdrawn | [WTS] [JSN] |
S1-231492 | Pseudo-CR on Consolidated KPIs of FS_Sensing |
pCR revision of S1-231419 revised to S1-231761 |
Deutsche Telekom AG, Nokia, Ericsson | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231493 | New WID on Ambient power-enabled Internet of Things |
WID new revision of S1-231457 revised to S1-231792 |
OPPO |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231494 | Skeleton for new TS on AmbientIoT if needed |
other revision of S1-231041 |
Editor |
S1-102 AI: 4 |
noted | [WTS] [JSN] | |||
S1-231495 | Pseudo-CR on Consolidated requirements of FS_Sensing |
pCR revision of S1-231490 revised to S1-231747 |
Deutsche Telekom AG, ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231496 | Discussion on consolidated requirements of FS_Sensing |
discussion revision of S1-231479 revised to S1-231746 |
Deutsche Telekom, ZTE |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | |||
S1-231497 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231498 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231499 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231500 | Pseudo-CR on Definitions for TR 22.848 |
pCR revision of S1-231158 |
Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
agreed | [WTS] [JSN] |
S1-231501 | Use case on Scalable SNPN Interconnect with dynamic connections | pCR | Intel, Cisco Systems, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231502 | CR on interconnection of on-board naval non-public networks |
pCR revision of S1-231105 revised to S1-231519 |
b<>com, Airbus, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231503 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231504 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231505 | Use case for prioritizing home RAN over partner operator s RAN |
pCR revision of S1-231255 |
CableLabs, Comcast | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231506 | Requirements Consolidation- Further Aspects |
pCR revision of S1-231344 |
ZTE, China Unicom | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] |
S1-231507 | Updated Consolidation on general and charging reqs |
pCR revision of S1-231048 revised to S1-231526 |
China Unicom, Charter Communications, ZTE Corporation and CATT | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231508 | Pseudo-CR on Security Consideration |
pCR revision of S1-231137 revised to S1-231723 |
CATT, Charter Communications | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231509 | Update to the Use Case Asynchronous FL via direct device connection |
pCR revision of S1-231301 |
InterDigital Inc., OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
agreed | [WTS] [JSN] |
S1-231510 | Consolidation on Functional Requirement of AIML-Ph2 |
pCR revision of S1-231352 revised to S1-231708 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] |
S1-231511 | Consolidation on KPI table of AIML-Ph2 |
pCR revision of S1-231099 revised to S1-231725 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] |
S1-231512 | TR conclusion |
pCR revision of S1-231102 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
agreed | [WTS] [JSN] |
S1-231513 | New WID on AI/ML Model Transfer-Phase 2 |
WID new revision of S1-231101 revised to S1-231807 |
OPPO |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231514 | Pseudo-CR on Consolidation access control and security aspects |
pCR revision of S1-231140 revised to S1-231521 |
CATT, China Unicom, Charter Communications | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231515 | WID on Indirect Network Sharing |
WID new revision of S1-231050 revised to S1-231711 |
China Unicom, China Telecom, Charter Communications, vivo, CAICT, CATT, Tencent, Spreadtrum Communications, Xiaomi, ZTE Corporation, CITC, OPPO, one2many |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231516 | CR on mobility between naval non-public networks |
pCR revision of S1-231106 revised to S1-231518 |
b<>com, Airbus, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231517 | Use Case on Interconnectivity between SNPNs |
pCR revision of S1-231112 revised to S1-231637 |
NEC | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231518 | CR on mobility between naval non-public networks |
pCR revision of S1-231516 revised to S1-231636 |
b<>com, Airbus, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231519 | CR on interconnection of on-board naval non-public networks |
pCR revision of S1-231502 revised to S1-231628 |
b<>com, Airbus, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231520 | Use case on Scalable SNPN Interconnect with dynamic connections |
pCR revised to S1-231626 |
Intel, Cisco Systems, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231521 | Pseudo-CR on Consolidation access control and security aspects |
pCR revision of S1-231514 revised to S1-231527 |
CATT, China Unicom, Charter Communications, Nokia | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231522 | FS_Netshare Conclusions and Recommendations |
pCR revision of S1-231052 |
China Unicom | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] |
S1-231523 | Terminology Adaption and Alignment |
pCR revision of S1-231139 |
CATT | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] |
S1-231524 | Use case for prioritizing home RAN over partner operator s RAN |
pCR revised to S1-231525 |
CableLabs, Comcast | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
revised | [WTS] [JSN] |
S1-231525 | Use case for prioritizing home RAN over partner operator s RAN |
pCR revision of S1-231524 |
CableLabs, Comcast | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] |
S1-231526 | Updated Consolidation on general aspects |
pCR revision of S1-231507 |
China Unicom | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] |
S1-231527 | Pseudo-CR on Consolidation access control and security aspects |
pCR revision of S1-231521 |
CATT, China Unicom, Charter Communications, Nokia | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] |
S1-231528 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231529 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231530 | pCR on resolving EN in 5.9 Use case on Renewable Energy usage information exposure |
pCR revision of S1-231069 revised to S1-231550 |
Rakuten Mobile, Toyota Motor Corporation, MediaTek Inc, [China Mobile] | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231531 | pCR on clean-up of TR 22.882 |
pCR revision of S1-231129 |
China Mobile | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231532 | pCR on resolving EN in 5.6 Use case on supporting service-level energy efficiency analysis for verticals |
pCR revision of S1-231127 |
China Mobile | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231533 | Pseudo-CR to resolve the EN in clause 5.7 | pCR | ZTE | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231534 | pCR on resolving EN in 5.8 |
pCR revised to S1-231551 |
Lenovo | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231535 | Pseudo-CR on quality improvements to FS_SOBOT TR 22.916 |
pCR revision of S1-231278 |
Huawei | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
agreed | [WTS] [JSN] |
S1-231536 | Update on 5.1 Online cooperative high-resolution 3D map building |
pCR revision of S1-231319 revised to S1-231548 |
LG Electronics | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231537 | resolve of EN for use case 5.2 |
pCR revision of S1-231074 revised to S1-231549 |
vivo | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231538 | Pseudo-CR on Adding the new use case on Energy-Efficient Utilization of 5G Idle Computing Power |
pCR revision of S1-231067 |
AsiaInfo | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
merged | [WTS] [JSN] |
S1-231539 | Use case on energy as service criteria for 5G environment adaptation |
pCR revision of S1-231110 revised to S1-231552 |
SK Telecom, LG Uplus, Rakuten, ETRI, KT, Nokia, Nokia Shanghai Bell, NTT DOCOMO, Lenovo | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231540 | New UC on pooling coverage layers for EE |
pCR revision of S1-231181 |
Nokia, Nokia Shanghai Bell | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231541 | Use Case on Reducing GHG Footprint of Application Services |
pCR revision of S1-231210 revised to S1-231553 |
MediaTek Inc., Toyota Motor Corporation | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231542 | Use case on communication service with carbon-aware service requirements |
pCR revision of S1-231211 revised to S1-231554 |
MediaTek Inc., Toyota Motor Corporation | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231543 | Use case on communication service with best-effort renewable energy usage |
pCR revision of S1-231212 |
MediaTek Inc., Toyota Motor Corporation | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231544 | Consolidation requirements on FS_EnergyServ |
pCR revision of S1-231440 revised to S1-231555 |
China Mobile, Samsung | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231545 | New WID on Energy Efficiency as Service Criteria |
WID new revision of S1-231126 revised to S1-231556 |
China Mobile |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231546 | SOBOT Use Case: MEC for Efficient Management of Geo-surface Sensing Data Using a Group of Aerial Robots |
pCR revision of S1-231397 revised to S1-231720 |
LG Electronics | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
revised | [WTS] [JSN] |
S1-231547 | Pseudo-CR on edge computing in CCRC |
pCR revision of S1-231221 |
China Telecom | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
agreed | [WTS] [JSN] |
S1-231548 | Update on 5.1 Online cooperative high-resolution 3D map building |
pCR revision of S1-231536 |
LG Electronics | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
agreed | [WTS] [JSN] |
S1-231549 | resolve of EN for use case 5.2 |
pCR revision of S1-231537 |
vivo | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
agreed | [WTS] [JSN] |
S1-231550 | pCR on resolving EN in 5.9 Use case on Renewable Energy usage information exposure |
pCR revision of S1-231530 |
Rakuten Mobile, Toyota Motor Corporation, MediaTek Inc, [China Mobile] | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231551 | pCR on resolving EN in 5.8 |
pCR revision of S1-231534 revised to S1-231770 |
Lenovo, AsiaInfo | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231552 | Use case on energy as service criteria for 5G environment adaptation |
pCR revision of S1-231539 |
SK Telecom, LG Uplus, Rakuten, ETRI, KT, Nokia, Nokia Shanghai Bell, NTT DOCOMO, Lenovo | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231553 | Use Case on Reducing GHG Footprint of Application Services |
pCR revision of S1-231541 |
MediaTek Inc., Toyota Motor Corporation | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231554 | Use case on communication service with carbon-aware service requirements |
pCR revision of S1-231542 revised to S1-231771 |
MediaTek Inc., Toyota Motor Corporation | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231555 | Consolidation requirements on FS_EnergyServ |
pCR revision of S1-231544 revised to S1-231772 |
China Mobile, Samsung | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231556 | New WID on Energy Efficiency as Service Criteria |
WID new revision of S1-231545 revised to S1-231780 |
China Mobile, Asia Info, Lenovo |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231557 | New WID on Edge Computing Considering the Load of Service Hosting Environment |
WID new revision of S1-231391 revised to S1-231757 |
China Telecom | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231558 | Additional requirements for selecting and/or changing the user plane paths based on the load of the Service Hosting Environment |
CR revision of S1-231392 revised to S1-231758 |
China Telecom, ZTE, Samsung | 22.261 19.2.0 CR#6912 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231559 | New WID on Integrated Sensing and Communication |
WID new revision of S1-231446 revised to S1-231778 |
SA1 | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231560 | Pseudo-CR on update for scope and overview sections |
pCR revision of S1-231084 |
Novamint, Nokia, China Telecom, Huawei | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231561 | Pseudo-CR on new terminology for UE-Satellite-UE communication |
pCR revision of S1-231144 revised to S1-231576 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231562 | pCR on updating service requirements for clause 5.1 |
pCR revision of S1-231117 revised to S1-231577 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231563 | Pseudo-CR on update of clause 5.1 Use case on store and forward - MO |
pCR revision of S1-231120 |
ETRI, Novamint, Lockheed Martin | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231564 | pCR on update service requirements for clause 5.2 |
pCR revision of S1-231118 revised to S1-231578 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231565 | pCR on Updates of 5.2 Store and Forward- MT |
pCR revision of S1-231143 revised to S1-231579 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231566 | pCR on updating service requirements for clause 5.6 |
pCR revision of S1-231119 revised to S1-231677 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231567 | Pseudo-CR on Updates of 5.10 Vehicle Fleet Management |
pCR revision of S1-231141 revised to S1-231701 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231568 | Pseudo-CR on consolidated requirements for TR 22.865 | pCR | Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom, CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231569 | Pseudo-CR on consolidated requirements for TR 22.865 for discussion | pCR | Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom, CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231570 | Pseudo-CR on consolidated requirements for TR 22.865 for next meeting | pCR | Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom, CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231571 | New WID: Satellite access - Phase 3 |
WID new revised to S1-231738 |
Novamint, China Telecom, Thales, Airbus, Avanti, CEWiT, ESA, ETRI, Eutelsat, GateHouse, Gilat, Hughes Network systems, IIIT Hyderabad, Inmarsat, Intelsat, IRT Saint Exup ry, Ligado, Lockheed Martin, Nokia, Omnispace, OneWeb, Sateliot, SES, ST Engineering iDirect Ireland, TNO, TTP |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231572 | Pseudo-CR on Updates of 5.13 Enhanced Positioning Service |
pCR revision of S1-231142 revised to S1-231573 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231573 | Pseudo-CR on Updates of 5.13 Enhanced Positioning Service |
pCR revision of S1-231572 revised to S1-231722 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231574 | Pseudo-CR on updating the PR in the use case on store and forward emergency report |
pCR revision of S1-231235 |
Xiaomi | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231575 | Pseudo-CR on update and clean-ups for TR 22.865 |
pCR revision of S1-231085 |
Novamint, China Telecom | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231576 | Pseudo-CR on new terminology for UE-Satellite-UE communication |
pCR revision of S1-231561 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231577 | pCR on updating service requirements for clause 5.1 |
pCR revision of S1-231562 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231578 | pCR on update service requirements for clause 5.2 |
pCR revision of S1-231564 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231579 | Pseudo-CR on Updates of 5.2 Store and Forward - MT |
pCR revision of S1-231565 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231580 | Addressing ENs on use case 5.17 |
pCR revision of S1-231213 revised to S1-231587 |
NTT DOCOMO | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231581 | Editorial update proposal on use case 5.17 |
pCR revision of S1-231214 |
NTT DOCOMO | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231582 | 22.856 pCR: Removal of all Editor's Notes |
pCR revision of S1-231094 revised to S1-231623 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231583 | pCR on update of 5.7 AR Enabled Immersive Experience |
pCR revision of S1-231162 revised to S1-231690 |
vivo | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231584 | 22.856 pCR UPdate 5.8 Use Case Supporting multi-service coordination in one mobile metaverse service |
pCR revision of S1-231092 revised to S1-231691 |
Samsung, China Mobile | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231585 | pCR on update of 5.12 Virtual humans in metaverse |
pCR revision of S1-231163 |
vivo | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231586 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231587 | Addressing ENs on use case 5.17 |
pCR revision of S1-231580 revised to S1-231598 |
NTT DOCOMO | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231588 | Update of the Use Case on Authorization of Avatar Usage Rights |
pCR revision of S1-231353 revised to S1-231592 |
China Mobile, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231589 | 22.856 pCR Update 5.27 Use case of Localized Mobile Metaverse Overload |
pCR revision of S1-231093 revised to S1-231597 |
Samsung | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231590 | PCR on Update of 5.28 User identities in a digital asset container |
pCR revision of S1-231014 revised to S1-231599 |
China Telecom | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231591 | pCR on update of Annex C Energy Efficiency of Content Delivery for Metaverse Media Communication |
pCR revision of S1-231164 revised to S1-231692 |
vivo | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231592 | Update of the Use Case on Authorization of Avatar Usage Rights |
pCR revision of S1-231588 |
China Mobile, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231593 | pCR to TR 22.865: Requirement Consolidation for KPIs |
pCR revision of S1-231109 revised to S1-231696 |
Huawei, Samsung, Nokia, Nokia Shanghai Bell, Tencent | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231594 | 22.856 pCR Add conclusion |
pCR revision of S1-231100 |
Samsung (Rapporteur) | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231595 | New WID on Mobile Metaverse Services |
WID new revision of S1-231081 revised to S1-231715 |
Samsung |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231596 | LS to Metaverse Standards Forum (MSF) Network Requirements and Capabilities Domain Working Group (cc MSF Digital Asset Management Working Group) on LS on Metaverse requirements and KPIs |
LS out revision of S1-231204 revised to S1-231697 |
Nokia, Nokia Shanghai Bell |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |||
S1-231597 | 22.856 pCR Update 5.27 Use case of Localized Mobile Metaverse Overload |
pCR revision of S1-231589 |
Samsung | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231598 | Addressing ENs on use case 5.17 |
pCR revision of S1-231587 |
NTT DOCOMO | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231599 | PCR on Update of 5.28 User identities in a digital asset container |
pCR revision of S1-231590 |
China Telecom | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231600 | Pseudo-CR on TR updates and clean-up |
pCR revision of S1-231189 revised to S1-231620 |
Qualcomm | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231601 | Clarification on RAN impact of dual steering |
pCR revision of S1-231152 |
vivo | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
noted | [WTS] [JSN] |
S1-231602 | Use Case on supplementary downlink data via a second 3GPP network |
pCR revision of S1-231017 revised to S1-231706 |
Thales, Lockheed Martin, SES, Avanti, Intelsat, CeWIT, Airbus, Hispasat, Inmarsat, Gilat, TNO, ESA, Qualcomm, Novamint, Lenovo, Ericsson, IRT Saint Exupery, JSAT, Ligado, Sateliot, Omnispace, Gatehouse, EchoStar, Viasat, Cobham Satcom, SA catapult, Eutelsat, Leonardo, OneWeb, Forsway | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231603 | Use Case on traffic duplication for a set of devices |
pCR revision of S1-231175 revised to S1-231751 |
NEC | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231604 | pCR for FS_DualSteer Consolidated requirements |
pCR revision of S1-231188 revised to S1-231621 |
Qualcomm | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231605 | New WID on Upper layer traffic steering, switching and splitting over dual 3GPP access |
WID new revised to S1-231795 |
Qualcomm |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231606 | Pseudo-CR on TR conclusions |
pCR revision of S1-231190 |
Qualcomm | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
agreed | [WTS] [JSN] |
S1-231607 | pCR on FS-UAV-Ph3_Overview section |
pCR revision of S1-231259 revised to S1-231762 |
China Mobile | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231608 | Pseudo-CR on quality improvements to FS_UAV_ph3 TR 22.843 |
pCR revision of S1-231276 |
Huawei | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231609 | Use Case on UAV traffic over alternative networks |
pCR revision of S1-231358 revised to S1-231638 |
Qualcomm, Futurewei, Lockheed Martin, InterDigital | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231610 | Use Case on UAV simultaneous traffic over two networks |
pCR revision of S1-231359 |
Qualcomm, Futurewei, InterDigital, Lockheed Martin | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231611 | Use Case on UAV control in different aerial flight zones |
pCR revision of S1-231198 |
Qualcomm | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231612 | pCR on updates on use case for network-assisted UAV DAA |
pCR revision of S1-231257 revised to S1-231622 |
CMCC, Qualcomm, Futurewei | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231613 | pCR on use case for Geofencing for Visual Line-of-Sight UAV missions |
pCR revision of S1-231256 |
CMCC | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
noted | [WTS] [JSN] |
S1-231614 | Pseudo-CR on Potential new requirements for Geofencing for Visual Line-of-Sight UAV missions |
pCR revision of S1-231243 |
Orange | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231615 | pCR on consolidated requirements on for UAV Phase 3 |
pCR revision of S1-231381 revised to S1-231618 |
China Mobile, Nokia | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231616 | New WID on UAV Phase 3 |
WID new revision of S1-231380 revised to S1-231619 |
China Mobile Com. Corporation | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231617 | pCR on updating use case 5.2 Supporting UAV flight preparation |
pCR revision of S1-231231 |
Deutsche Telekom, Nokia, Futurewei, InterDigital | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231618 | pCR on consolidated requirements on for UAV Phase 3 |
pCR revision of S1-231615 revised to S1-231624 |
China Mobile, Nokia | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231619 | New WID on UAV Phase 3 |
WID new revision of S1-231616 revised to S1-231625 |
China Mobile Com. Corporation | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231620 | Pseudo-CR on TR updates and clean-up |
pCR revision of S1-231600 |
Qualcomm | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
agreed | [WTS] [JSN] |
S1-231621 | pCR for FS_DualSteer Consolidated requirements |
pCR revision of S1-231604 revised to S1-231707 |
Qualcomm, Lenovo, CableLabs, Xiaomi, Comcast Corporation, Verizon UK Ltd, Tencent, Thales, Charter Communications, SyncTechno Inc., InterDigital, KDDI, Nokia, Nokia-Shanghai Bell, Vivo, Lockheed Martin, Sennheiser, Viasat, KPN, LG Electronics, Apple, Novamint, Futurewei, NEC, ETRI, IRT Saint Exupery, CATT, DSIT, Ericsson | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231622 | pCR on updates on use case for network-assisted UAV DAA |
pCR revision of S1-231612 |
CMCC, Qualcomm, Futurewei | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231623 | 22.856 pCR: Removal of all Editor's Notes |
pCR revision of S1-231582 revised to S1-231767 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231624 | pCR on consolidated requirements on for UAV Phase 3 |
pCR revision of S1-231618 revised to S1-231639 |
China Mobile, Nokia | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231625 | New WID on UAV Phase 3 |
WID new revision of S1-231619 revised to S1-231705 |
China Mobile Com. Corporation | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231626 | Use case on Scalable SNPN Interconnect with dynamic connections |
pCR revision of S1-231520 revised to S1-231775 |
Intel, Cisco Systems, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
revised | [WTS] [JSN] |
S1-231627 | MPS for Messaging when access is WLAN |
CR revision of S1-231264 |
Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | 22.153 19.0.0 CR#611 catB | MPS4msg | Rel-19 |
S1-102 AI: 7.13 |
agreed | [WTS] [JSN] |
S1-231628 | CR on interconnection of on-board naval non-public networks |
pCR revision of S1-231519 |
b<>com, Airbus, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
agreed | [WTS] [JSN] |
S1-231629 | Add requirements on NPN security considerations |
CR revision of S1-231390 revised to S1-231782 |
China Telecom, Samsung | 22.261 19.2.0 CR#6883 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231630 | Introduction and updates of Smart railway definitions | CR | Kyonggi University, KT | 22.989 19.2.0 CR#241 catD | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
agreed | [WTS] [JSN] |
S1-231631 | Multiple concurrent mobility services |
CR revised to S1-231679 |
Kyonggi University, KT | 22.989 19.2.0 CR#281 catB | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] |
S1-231632 | Transportation convenience service for the passengers for the reduced mobility |
CR revised to S1-231680 |
Kyonggi University, KT | 22.989 19.2.0 CR#271 catB | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] |
S1-231633 | Clean-up of Railway Emergency Communication related use cases | CR | UIC | 22.989 19.2.0 CR#261 catF | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
agreed | [WTS] [JSN] |
S1-231634 | FRMCS Phase 5 |
WID new revised to S1-231733 |
UIC |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231635 | Usage of multi-talker control for Ad hoc Group Emergency Voice Communications | CR | UIC | 22.179 17.1.0 CR#762 catC | DUMMY | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] |
S1-231636 | CR on mobility between naval non-public networks |
pCR revision of S1-231518 |
b<>com, Airbus, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
agreed | [WTS] [JSN] |
S1-231637 | Use Case on Interconnect between SNPNs |
pCR revision of S1-231517 |
NEC | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
agreed | [WTS] [JSN] |
S1-231638 | Use Case on UAV traffic over alternative networks |
pCR revision of S1-231609 |
Qualcomm, Futurewei, Lockheed Martin, InterDigital | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231639 | pCR on consolidated requirements on for UAV Phase 3 |
pCR revision of S1-231624 revised to S1-231773 |
China Mobile, Nokia | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] |
S1-231640 | Notification of updated list of participants of Ad hoc Group Emergency Alert |
CR revision of S1-231328 revised to S1-231719 |
UIC | 22.28 19.1.0 CR#1632 catA | AHGC | Rel-19 |
S1-102 AI: 6.1 |
revised | [WTS] [JSN] |
S1-231641 | Sensing drafting report | report | Rapporteur / Session Chair |
S1-102 AI: 8 |
agreed | [WTS] [JSN] | |||
S1-231642 | Ambient IoT drafting report | report | Rapporteur / Session Chair |
S1-102 AI: 8 |
agreed | [WTS] [JSN] | |||
S1-231643 | Metaverse drafting report | report | Rapporteur / Session Chair |
S1-102 AI: 8 |
agreed | [WTS] [JSN] | |||
S1-231644 | FRMCS_Ph5 drafting report | report | Rapporteur / Session Chair |
S1-102 AI: 8 |
agreed | [WTS] [JSN] | |||
S1-231645 | NetShare + AIML_Ph2 drafting report | report | Rapporteur / Session Chair |
S1-102 AI: 8 |
agreed | [WTS] [JSN] | |||
S1-231646 | DualSteer + UAV drafting report | report | Rapporteur / Session Chair |
S1-102 AI: 8 |
agreed | [WTS] [JSN] | |||
S1-231647 | Sat5G drafting report | report | Rapporteur / Session Chair |
S1-102 AI: 8 |
agreed | [WTS] [JSN] | |||
S1-231648 | EnergyServ + SOBOT drafting report | report | Rapporteur / Session Chair |
S1-102 AI: 8 |
agreed | [WTS] [JSN] | |||
S1-231649 | ISN drafting report | report | Rapporteur / Session Chair |
S1-102 AI: 8 |
agreed | [WTS] [JSN] | |||
S1-231650 | FS_Sensing Status report | report | Deutsche Telekom |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231651 | Sensing Status report | report | Deutsche Telekom |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231652 | FS_AmbientIoT Status report | report | OPPO |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231653 | AmbientIoT Status report | report | OPPO |
S1-102 AI: 8 |
withdrawn | [WTS] [JSN] | |||
S1-231654 | FS_Metaverse Status report | report | Samsung |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231655 | Metaverse Status report | report | Samsung |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231656 | FS_NetShare Status report | report | China Unicom |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231657 | NetShare Status report | report | China Unicom |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231658 | FS_FRMCS_Ph5 Status report | report | UIC |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231659 | FRMCS_Ph5 Status report | report | UIC |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231660 | FS_AIML_Ph2 Status report | report | OPPO |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231661 | AIML_Ph2 Status report | report | OPPO |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231662 | FS_ 5GSAT_Ph3 Status report | report | Novamint |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231663 | 5GSAT_Ph3 Status report | report | Novamint |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231664 | FS_UAV_Ph3 Status report | report | China Mobile |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231665 | UAV_Ph3 Status report | report | China Mobile |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231666 | FS_DualSteer Status report | report | Qualcomm |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231667 | DualSteer Status report | report | Qualcomm |
S1-102 AI: 8 |
withdrawn | [WTS] [JSN] | |||
S1-231668 | FS_EnergieServ Status report | report | China Mobile |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231669 | EnergieServ Status report | report | China Mobile |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231670 | FS_ISN Status report | report | Novamint |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231671 | Mini-WID UE-to-UE Multi Hop Relay Status report | WID new | FirstNet |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231672 | Mini-WID on Preventing Excessive Data Exposure within an NPN Status report | WID new | China Telecom |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231673 | Mini-WID on Human readable service name Status report | WID new | Qualcomm |
S1-102 AI: 8 |
withdrawn | [WTS] [JSN] | |||
S1-231674 | Mini-WID on Supporting of Edge Computing for Cloud Phone Status report | WID new | China Telecom |
S1-102 AI: 8 |
withdrawn | [WTS] [JSN] | |||
S1-231675 | Mini-WID on MPS for Dual Connectivity and Multiple Access Technologies Status report | WID new | Peraton Labs |
S1-102 AI: 8 |
withdrawn | [WTS] [JSN] | |||
S1-231676 | Update to Use Case on Use case on UAV flight trajectory tracing |
pCR revised to S1-231681 |
Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231677 | pCR on updating service requirements for clause 5.6 |
pCR revision of S1-231566 revised to S1-231700 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231678 | Consolidation on KPI for Ambient IoT |
pCR revision of S1-231251 revised to S1-231713 |
OPPO, CMCC, Futurewei, vivo, Huawei? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231679 | Multiple concurrent mobility services |
CR revision of S1-231631 revised to S1-231732 |
Kyonggi University, KT | 22.989 19.2.0 CR#282 catB | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] |
S1-231680 | Transportation convenience service for the passengers for the reduced mobility |
CR revision of S1-231632 revised to S1-231731 |
Kyonggi University, KT | 22.989 19.2.0 CR#272 catB | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
revised | [WTS] [JSN] |
S1-231681 | Update to Use Case on Use case on UAV flight trajectory tracing |
pCR revision of S1-231676 |
Qualcomm, CMCC | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231682 | Pseudo-CR on FS_Ambient IoT, update KPI Device Density to clause 5.8 Finding Remote Lost Item |
pCR revision of S1-231295 |
Huawei, Qualcomm? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231683 | Pseudo-CR on FS_Ambient IoT, update Max. allowed end-to-end latency KPI of clause 5.5 intralogistics in automobile manufacturing |
pCR revision of S1-231298 |
Huawei | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231684 | Aligning the RAN sharing related definitions for quality improvement | CR | Huawei, Nokia, Nokia Shanghai Bell, ZTE, China Unicom | 22.101 15.7.0 CR#589 catF | TEI15 | Rel-15 |
S1-102 AI: 5 |
agreed | [WTS] [JSN] |
S1-231685 | Aligning the RAN sharing related definitions for quality improvement | CR | Huawei, Nokia, Nokia Shanghai Bell, ZTE, China Unicom | 22.101 16.3.0 CR#590 catA | TEI15 | Rel-16 |
S1-102 AI: 5 |
agreed | [WTS] [JSN] |
S1-231686 | Aligning the RAN sharing related definitions for quality improvement | CR | Huawei, Nokia, Nokia Shanghai Bell, ZTE, China Unicom | 22.101 17.5.0 CR#591 catA | TEI15 | Rel-17 |
S1-102 AI: 5 |
agreed | [WTS] [JSN] |
S1-231687 | UE-to-UE Multi-hop relay requirements for mission critical communications |
CR revision of S1-231386 revised to S1-231716 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital. | 22.261 19.2.0 CR#6812 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231688 | UE-to-UE Multi-hop relay requirements for mission critical communications |
CR revision of S1-231388 revised to S1-231717 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital. | 22.28 19.1.0 CR#1602 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231689 | Pseudo-CR on Sensing Signals Terminology Update |
pCR revision of S1-231423 revised to S1-231742 |
Apple | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231690 | pCR on update of 5.7 AR Enabled Immersive Experience |
pCR revision of S1-231583 |
vivo | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231691 | 22.856 pCR UPdate 5.8 Use Case Supporting multi-service coordination in one mobile metaverse service |
pCR revision of S1-231584 revised to S1-231727 |
Samsung, China Mobile, Interdigital | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231692 | pCR on update of Annex C Energy Efficiency of Content Delivery for Metaverse Media Communication |
pCR revision of S1-231591 |
vivo | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231693 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231384 revised to S1-231695 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231694 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231695 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231693 revised to S1-231721 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231696 | pCR to TR 22.865: Requirement Consolidation for KPIs |
pCR revision of S1-231593 |
Huawei, Samsung, Nokia, Nokia Shanghai Bell, Tencent | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231697 | LS to Metaverse Standards Forum (MSF) Network Requirements and Capabilities Domain Working Group on LS on Metaverse requirements and KPIs |
LS out revision of S1-231596 revised to S1-231729 |
Nokia, Nokia Shanghai Bell |
S1-102 AI: 3 |
revised | [WTS] [JSN] | |||
S1-231698 | FS_Metaverse agreed, non-consolidated requirements |
pCR revised to S1-231728 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231699 | Not used | other | Not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231700 | pCR on updating service requirements for clause 5.6 |
pCR revision of S1-231677 |
CMCC | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231701 | Pseudo-CR on Updates of 5.10 Vehicle Fleet Management |
pCR revision of S1-231567 revised to S1-231724 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231702 | Pseudo-CR on consolidated requirements for TR 22.865 | pCR | Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom, CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231703 | Pseudo-CR on consolidated requirements for TR 22.865 for next meeting | pCR | Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom, CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
noted | [WTS] [JSN] |
S1-231704 | Pseudo-CR on consolidated requirements for TR 22.865 for discussion |
pCR revised to S1-231737 |
Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom, CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231705 | New WID on UAV Phase 3 |
WID new revision of S1-231625 revised to S1-231763 |
SA1 | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231706 | Use Case on supplementary downlink data via a second 3GPP network |
pCR revision of S1-231602 revised to S1-231800 |
Thales, Lockheed Martin, SES, Avanti, Intelsat, CeWIT, Airbus, Hispasat, Inmarsat, Gilat, TNO, ESA, Qualcomm, Novamint, Lenovo, Ericsson, IRT Saint Exupery, JSAT, Ligado, Sateliot, Omnispace, Gatehouse, EchoStar, Viasat, Cobham Satcom, SA catapult, Eutelsat, Leonardo, OneWeb, Forsway, China Telecom, ETRI, ST Engineering iDirect, | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231707 | pCR for FS_DualSteer Consolidated requirements |
pCR revision of S1-231621 revised to S1-231769 |
Qualcomm, Lenovo, CableLabs, Xiaomi, Comcast Corporation, Verizon UK Ltd, Tencent, Thales, Charter Communications, SyncTechno Inc., InterDigital, KDDI, Nokia, Nokia-Shanghai Bell, Vivo, Lockheed Martin, Sennheiser, Viasat, KPN, LG Electronics, Apple, Novamint, Futurewei, NEC, ETRI, IRT Saint Exupery, CATT, DSIT, Ericsson | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231708 | Consolidation on Functional Requirement of AIML-Ph2 |
pCR revision of S1-231510 revised to S1-231797 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] |
S1-231709 | not used | other | not used |
S1-102 AI: 9 |
withdrawn | [WTS] [JSN] | |||
S1-231710 | FS_Metaverse requirements not consolidated | pCR | Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
noted | [WTS] [JSN] |
S1-231711 | WID on Indirect Network Sharing |
WID new revision of S1-231515 revised to S1-231734 |
China Unicom, China Telecom, Charter Communications, vivo, CAICT, CATT, Tencent, Spreadtrum Communications, Xiaomi, ZTE Corporation, CITC, OPPO, one2many, CableLabs, Comcast |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231712 | Add Indirect Network Sharing to TS 22.261 |
CR revision of S1-231049 revised to S1-231735 |
China Unicom, CATT, ZTE Corporation and Charter Communications | 22.261 19.2.0 CR#6821 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231713 | Consolidation on KPI for Ambient IoT |
pCR revision of S1-231678 revised to S1-231744 |
OPPO, CMCC, Futurewei, vivo, Huawei? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231714 | LS to CT1 (cc SA2) on [DRAFT] Reply LS on access to stand-alone non-public network services |
LS out revision of S1-231132 |
SA1 | Rel-18 |
S1-102 AI: 3 |
noted | [WTS] [JSN] | ||
S1-231715 | New WID on Mobile Metaverse Services |
WID new revision of S1-231595 revised to S1-231730 |
Samsung |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231716 | UE-to-UE Multi-hop relay requirements for mission critical communications |
CR revision of S1-231687 revised to S1-231754 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital. | 22.261 19.2.0 CR#6813 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] |
S1-231717 | UE-to-UE Multi-hop relay requirements for mission critical communications |
CR revision of S1-231688 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital. | 22.28 19.1.0 CR#1603 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] |
S1-231718 | UE-to-UE multi-hop relay |
WID new revision of S1-231387 revised to S1-231755 |
FirstNet, SyncTechno Inc., Erillisverkot , Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital, BDBOS. | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231719 | Notification of updated list of participants of Ad hoc Group Emergency Alert |
CR revision of S1-231640 |
UIC | 22.28 19.1.0 CR#1633 catA | AHGC | Rel-19 |
S1-102 AI: 6.1 |
agreed | [WTS] [JSN] |
S1-231720 | SOBOT Use Case: MEC for Efficient Management of Geo-surface Sensing Data Using a Group of Aerial Robots |
pCR revision of S1-231546 |
LG Electronics | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
agreed | [WTS] [JSN] |
S1-231721 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231695 revised to S1-231726 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231722 | Pseudo-CR on Updates of 5.13 Enhanced Positioning Service |
pCR revision of S1-231573 |
CATT, Nokia | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231723 | Pseudo-CR on Security Consideration |
pCR revision of S1-231508 |
CATT, Charter Communications | 22.851 1.1.0 | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] |
S1-231724 | Pseudo-CR on Updates of 5.10 Vehicle Fleet Management |
pCR revision of S1-231701 revised to S1-231740 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
revised | [WTS] [JSN] |
S1-231725 | Consolidation on KPI table of AIML-Ph2 |
pCR revision of S1-231511 revised to S1-231741 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
revised | [WTS] [JSN] |
S1-231726 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231721 revised to S1-231739 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231727 | 22.856 pCR UPdate 5.8 Use Case Supporting multi-service coordination in one mobile metaverse service |
pCR revision of S1-231691 |
Samsung, China Mobile, Interdigital | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231728 | FS_Metaverse agreed, non-consolidated requirements and KPIs |
pCR revision of S1-231698 revised to S1-231749 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231729 | LS to Metaverse Standards Forum (MSF) Network Requirements and Capabilities Domain Working Group (cc TSG SA) on LS on Metaverse requirements and KPIs |
LS out LS To: Metaverse Standards Forum (MSF) Network Requirements and Capabilities Domain Working Group revision of S1-231697 |
3GPP TSG SA WG1 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | |||
S1-231730 | New WID on Mobile Metaverse Services |
WID new revision of S1-231715 revised to S1-231750 |
Samsung (Rapporteur) |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231731 | Transportation convenience service for the passengers for the reduced mobility |
CR revision of S1-231680 |
Kyonggi University, KT | 22.989 19.2.0 CR#273 catB | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
agreed | [WTS] [JSN] |
S1-231732 | Multiple concurrent mobility services |
CR revision of S1-231679 |
Kyonggi University, KT | 22.989 19.2.0 CR#283 catB | FS_FRMCS_Ph5 | Rel-19 |
S1-102 AI: 7.5 |
agreed | [WTS] [JSN] |
S1-231733 | FRMCS Phase 5 |
WID new revision of S1-231634 revised to S1-231779 |
UIC |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231734 | WID on Indirect Network Sharing |
WID new revision of S1-231711 revised to S1-231806 |
China Unicom, China Telecom, Charter Communications, vivo, CAICT, CATT, Tencent, Spreadtrum Communications, Xiaomi, ZTE Corporation, CITC, OPPO, one2many, CableLabs, Comcast |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231735 | Add Indirect Network Sharing to TS 22.261 |
CR revision of S1-231712 |
China Unicom, CATT, ZTE Corporation, Charter Communications, Nokia, Nokia Shanghai Bell | 22.261 19.2.0 CR#6822 catB | NETSHARE | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] |
S1-231736 | Add definitions for Indirect Network Sharing |
CR revision of S1-231068 |
China Unicom, CATT, Huawei, ZTE, Charter Communications, Nokia, Nokia Shanghai Bell | 22.261 19.2.0 CR#6841 catB | NETSHARE | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] |
S1-231737 | Pseudo-CR on consolidated requirements for TR 22.865 for discussion |
pCR revision of S1-231704 |
Novamint, Huawei, ETRI, Nokia, Gatehouse, China Telecom, CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231738 | New WID: Satellite access - Phase 3 |
WID new revision of S1-231571 |
Novamint, China Telecom, Thales, Airbus, Avanti, CEWiT, ESA, ETRI, Eutelsat, GateHouse, Gilat, Hughes Network systems, IIIT Hyderabad, Inmarsat, Intelsat, IRT Saint Exup ry, Ligado, Lockheed Martin, Nokia, Omnispace, OneWeb, Sateliot, SES, ST Engineering iDirect Ireland, TNO, TTP |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | |||
S1-231739 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231726 revised to S1-231748 |
Samsung, Huawei, Nokia | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231740 | Pseudo-CR on Updates of 5.10 Vehicle Fleet Management |
pCR revision of S1-231724 |
CATT | 22.865 1.0.0 | FS_5GSAT_Ph3 | Rel-19 |
S1-102 AI: 7.7 |
agreed | [WTS] [JSN] |
S1-231741 | Consolidation on KPI table of AIML-Ph2 |
pCR revision of S1-231725 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
agreed | [WTS] [JSN] |
S1-231742 | Pseudo-CR on Sensing Signals Terminology Update |
pCR revision of S1-231689 |
Apple | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231743 | Sobot Status Report | report | LG/Rapporteur |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231744 | Consolidation on KPI for Ambient IoT |
pCR revision of S1-231713 revised to S1-231766 |
OPPO, CMCC, Futurewei, vivo, Huawei? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231745 | TR 22.882 coversheet for SA approval |
TS or TR cover revision of S1-231130 revised to S1-231774 |
China Mobile | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | |
S1-231746 | Discussion on consolidated requirements of FS_Sensing |
discussion revision of S1-231496 |
Deutsche Telekom, ZTE |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] | |||
S1-231747 | Pseudo-CR on Consolidated requirements of FS_Sensing |
pCR revision of S1-231495 revised to S1-231791 |
Deutsche Telekom AG, ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231748 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231739 revised to S1-231784 |
Samsung, Huawei, Nokia | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] |
S1-231749 | FS_Metaverse agreed, non-consolidated requirements and KPIs |
pCR revision of S1-231728 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
noted | [WTS] [JSN] |
S1-231750 | New WID on Mobile Metaverse Services |
WID new revision of S1-231730 revised to S1-231783 |
Samsung (Rapporteur) |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231751 | Use Case on traffic duplication for a set of devices |
pCR revision of S1-231603 revised to S1-231768 |
NEC, Qualcomm, Ericsson, Lenovo, Nokia, Nokia Shanghai Bell, Novamint | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
revised | [WTS] [JSN] |
S1-231752 | LS to CT1 (cc SA2) on LS on periodic attempts for re-selection to a higher priority SNPN when |
LS out LS To: CT1 revision of S1-231467 |
SA1 | Rel-18 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | ||
S1-231753 | LS to ITU-T Focus Group on metaverse (FG-MV) (cc TSG SA WG4) on Reply LS on requesting collaboration on metaverse standardization work |
LS out LS To: ITU-T Focus Group on metaverse (FG-MV) revision of S1-231471 |
3GPP TSG SA WG1 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | |||
S1-231754 | UE-to-UE Multi-hop relay requirements for mission critical communications |
CR revision of S1-231716 |
FirstNet, SyncTechno Inc., Erillisverkot, Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital. | 22.261 19.2.0 CR#6814 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] |
S1-231755 | UE-to-UE multi-hop relay |
WID new revision of S1-231718 |
FirstNet, SyncTechno Inc., Erillisverkot , Netherlands Police, Ministere De L Interieur, AT&T, Norwegian Communications Authority, ASTRID, Telus, Apple, Qualcomm, MediaTek, Kyonggi University, KT, CATT, ZTE, Xiaomi, InterDigital, BDBOS, BMWK, Nokia, Nokia Shanghai Bell. | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | ||
S1-231756 | Multiple Access Technologies |
CR revision of S1-231472 |
Peraton Labs, CISA ECD, AT&T, Verizon, T-Mobile US | 22.153 19.0.0 CR#622 catB | TEI19, MPS_WLAN | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] |
S1-231757 | New WID on Edge Computing Considering the Operational Needs of Service Hosting Environment |
WID new revision of S1-231557 |
China Telecom | Rel-19 |
S1-102 AI: 4 |
noted | [WTS] [JSN] | ||
S1-231758 | 22.261v19.2.0 Supporting of edge computing for cloud phone |
CR revision of S1-231558 |
China Telecom, ZTE | 22.261 19.2.0 CR#6913 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
withdrawn | [WTS] [JSN] |
S1-231759 | Pseudo-CR on introducing overview section of FS_Sensing |
pCR revision of S1-231477 |
Deutsche Telekom AG, Xiaomi | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231760 | Update to Use Case of Seamless XR Streaming |
pCR revision of S1-231434 |
Qualcomm | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
noted | [WTS] [JSN] |
S1-231761 | Pseudo-CR on Consolidated KPIs of FS_Sensing |
pCR revision of S1-231492 revised to S1-231794 |
Deutsche Telekom AG, Nokia, Ericsson, Huawei | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231762 | pCR on FS-UAV-Ph3_Overview section |
pCR revision of S1-231607 |
China Mobile | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231763 | New WID on UAV Phase 3 |
WID new revision of S1-231705 revised to S1-231809 |
SA1 | Rel-19 |
S1-102 AI: 4 |
revised | [WTS] [JSN] | ||
S1-231764 | Pseudo-CR on deletion of digitally stored information in the use case 29 |
pCR revision of S1-231486 |
Xiaomi, Sharp | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231765 | Pseudo-CR on resolving the FFS about relay in the use case 27 |
pCR revision of S1-231488 revised to S1-231787 |
Xiaomi, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231766 | Consolidation on KPI for Ambient IoT |
pCR revision of S1-231744 |
OPPO, CMCC, Futurewei, vivo, Huawei? | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231767 | 22.856 pCR: Removal of all Editor's Notes |
pCR revision of S1-231623 |
Samsung, Huawei | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231768 | Use Case on traffic duplication for a set of devices |
pCR revision of S1-231751 |
NEC, Ericsson, Nokia, Nokia Shanghai Bell, Novamint, Qualcomm | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
noted | [WTS] [JSN] |
S1-231769 | pCR on Consolidated potential requirements |
pCR revision of S1-231707 |
Qualcomm | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
withdrawn | [WTS] [JSN] |
S1-231770 | pCR on resolving EN in 5.8 |
pCR revision of S1-231551 |
Lenovo, AsiaInfo | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231771 | Use case on communication service with carbon-aware service requirements |
pCR revision of S1-231554 |
MediaTek Inc., Toyota Motor Corporation | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231772 | Consolidation requirements on FS_EnergyServ |
pCR revision of S1-231555 |
China Mobile, Samsung | 22.882 1.0.0 | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231773 | pCR on consolidated requirements on for UAV Phase 3 |
pCR revision of S1-231639 |
China Mobile, Nokia | 22.843 1.0.0 | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] |
S1-231774 | TR 22.882 coversheet for SA approval |
TS or TR cover revision of S1-231745 |
China Mobile | FS_EnergyServ | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] | |
S1-231775 | Use case on Scalable SNPN Interconnect with dynamic connections |
pCR revision of S1-231626 |
Intel, Cisco Systems, Novamint | 22.848 0.0.0 | FS_ISN | Rel-19 |
S1-102 AI: 7.12 |
agreed | [WTS] [JSN] |
S1-231776 | LS to SA, SA3 (cc SA2, CT4) on LS on GSMA requirements regarding intermediaries in the roaming |
LS out LS To: SA, SA3 revision of S1-231470 |
SA1 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | |||
S1-231777 | Presentation of Specification/Report to TSG: TR 22.856 1.1.0 |
TS or TR cover revision of S1-231090 revised to S1-231789 |
Samsung | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
revised | [WTS] [JSN] | |
S1-231778 | New WID on Integrated Sensing and Communication |
WID new revision of S1-231559 |
Deutsche Telekom AG, Orange, Sharp Corporation, ZTE | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | ||
S1-231779 | FRMCS Phase 5 |
WID new revision of S1-231733 revised to S1-231808 |
UIC |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231780 | New WID on Energy Efficiency as Service Criteria |
WID new revision of S1-231556 revised to S1-231810 |
China Mobile, Asia Info, Lenovo |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231781 | New WID on NPN security considerations |
WID new revision of S1-231389 |
China Telecom |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | |||
S1-231782 | Add requirements on NPN security considerations |
CR revision of S1-231629 |
China Telecom, Samsung | 22.261 19.2.0 CR#6884 catB | DUMMY | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] |
S1-231783 | New WID on Mobile Metaverse Services |
WID new revision of S1-231750 revised to S1-231790 |
Samsung (Rapporteur) |
S1-102 AI: 4 |
revised | [WTS] [JSN] | |||
S1-231784 | FS_Metaverse Requirement Consolidation |
pCR revision of S1-231748 |
Samsung, Huawei, Nokia | 22.856 1.0.0 | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] |
S1-231785 | Update to Use Case on Finding Lost Item |
pCR revision of S1-231485 revised to S1-231812 |
Qualcomm, Futurewei, Wiliot, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231786 | Pseudo-CR on resolving the Editor s Note in the Use case for out-of-coverage 5G Wireless sensing for automotive maneuvering and navigation service |
pCR revision of S1-231484 revised to S1-231793 |
Huawei | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231787 | Pseudo-CR on resolving the FFS about relay in the use case 27 |
pCR revision of S1-231765 revised to S1-231813 |
Xiaomi, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
revised | [WTS] [JSN] |
S1-231788 | Ambient IoT functional CPR |
pCR revision of S1-231487 |
OPPO (Rapporteur) | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
noted | [WTS] [JSN] |
S1-231789 | Presentation of Specification/Report to TSG: TR 22.856 1.1.0 |
TS or TR cover revision of S1-231777 |
Samsung | FS_Metaverse | Rel-19 |
S1-102 AI: 7.3 |
agreed | [WTS] [JSN] | |
S1-231790 | New WID on Mobile Metaverse Services |
WID new revision of S1-231783 |
Samsung (Rapporteur) |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | |||
S1-231791 | Pseudo-CR on Consolidated requirements of FS_Sensing |
pCR revision of S1-231747 revised to S1-231811 |
Deutsche Telekom AG, ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] |
S1-231792 | New WID on Ambient power-enabled Internet of Things |
WID new revision of S1-231493 |
OPPO |
S1-102 AI: 4 |
noted | [WTS] [JSN] | |||
S1-231793 | Pseudo-CR on resolving the Editor s Note in the Use case for out-of-coverage 5G Wireless sensing for automotive maneuvering and navigation service |
pCR revision of S1-231786 |
Huawei, DENSO | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231794 | Pseudo-CR on Consolidated KPIs of FS_Sensing |
pCR revision of S1-231761 |
Deutsche Telekom AG, Nokia, Ericsson, Huawei | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231795 | New WID on Upper layer traffic steering, switching and splitting over dual 3GPP access |
WID new revision of S1-231605 |
Qualcomm |
S1-102 AI: 4 |
noted | [WTS] [JSN] | |||
S1-231796 | Cover sheet of the TR 22.851 |
TS or TR cover revision of S1-231335 |
Rapporteur (China Unicom) | FS_NetShare | Rel-19 |
S1-102 AI: 7.4 |
agreed | [WTS] [JSN] | |
S1-231797 | Consolidation on Functional Requirement of AIML-Ph2 |
pCR revision of S1-231708 |
OPPO | 22.876 1.0.0 | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
agreed | [WTS] [JSN] |
S1-231798 | TR 22.843 coversheet for SA approval |
TS or TR cover revision of S1-231262 revised to S1-231799 |
China Mobile Com. Corporation | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
revised | [WTS] [JSN] | |
S1-231799 | TR 22.843 coversheet for SA approval |
TS or TR cover revision of S1-231798 |
China Mobile Com. Corporation | FS_UAV_Ph3 | Rel-19 |
S1-102 AI: 7.8 |
agreed | [WTS] [JSN] | |
S1-231800 | Use Case on supplementary downlink data via a second 3GPP network |
pCR revision of S1-231706 |
Thales, Lockheed Martin, SES, Avanti, Intelsat, CeWIT, Airbus, Hispasat, Inmarsat, Gilat, TNO, ESA, Qualcomm, Novamint, Lenovo, Ericsson, IRT Saint Exupery, JSAT, Ligado, Sateliot, Omnispace, Gatehouse, EchoStar, Viasat, Cobham Satcom, SA catapult, Eutelsat, Leonardo, OneWeb, Forsway, China Telecom, ETRI, ST Engineering iDirect, | 22.841 1.0.0 | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
noted | [WTS] [JSN] |
S1-231801 | TR Cover page_for approval |
TS or TR cover revision of S1-231192 |
Qualcomm | FS_DualSteer | Rel-19 |
S1-102 AI: 7.9 |
noted | [WTS] [JSN] | |
S1-231802 | Update on 5.3 Smart Communication Support for Data Collection and Fusion Using Multimodal Sensors in Multi-Robot / Multi-Agent Scenarios |
pCR revision of S1-231321 |
LG Electronics | 22.916 0.3.0 | FS_SOBOT | Rel-19 |
S1-102 AI: 7.11 |
agreed | [WTS] [JSN] |
S1-231803 | Status Report for XRMobility | report | Editor (China Mobile) |
S1-102 AI: 8 |
noted | [WTS] [JSN] | |||
S1-231804 | LS to CT1 on Reply LS on SENSE for home PLMN and disaster roaming PLMN |
LS out LS To: CT1 revision of S1-231236 |
SA1 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | |||
S1-231805 | LS to SA5 (cc SA, RAN, CT, SA1, SA2, SA3, SA4, SA6, RAN1, RAN2, RAN3, RAN4, CT3, CT4) on Reply LS on 3GPP work on Energy Efficiency |
LS out LS To: SA5 revision of S1-231378 |
SA1 | EE5GPLUS_Ph2 | Rel-18 |
S1-102 AI: 3 |
approved | [WTS] [JSN] | |
S1-231806 | WID on Indirect Network Sharing |
WID new revision of S1-231734 |
China Unicom, China Telecom, Charter Communications, vivo, CAICT, CATT, Tencent, Spreadtrum Communications, Xiaomi, ZTE Corporation, CITC, OPPO, one2many, CableLabs, Comcast |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | |||
S1-231807 | New WID on AI/ML Model Transfer-Phase 2 |
WID new revision of S1-231513 |
OPPO |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | |||
S1-231808 | FRMCS Phase 5 |
WID new revision of S1-231779 |
UIC |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | |||
S1-231809 | New WID on UAV Phase 3 |
WID new revision of S1-231763 |
SA1 | Rel-19 |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | ||
S1-231810 | New WID on Energy Efficiency as Service Criteria |
WID new revision of S1-231780 |
China Mobile, Asia Info, Lenovo |
S1-102 AI: 4 |
agreed | [WTS] [JSN] | |||
S1-231811 | Pseudo-CR on Consolidated requirements of FS_Sensing |
pCR revision of S1-231791 |
Deutsche Telekom AG, ZTE | 22.837 1.0.0 | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
S1-231812 | Update to Use Case on Finding Lost Item |
pCR revision of S1-231785 |
Qualcomm, Futurewei, Wiliot, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231813 | Pseudo-CR on resolving the FFS about relay in the use case 27 |
pCR revision of S1-231787 |
Xiaomi, KPN | 22.84 1.1.0 | FS_AmbientIoT | Rel-19 |
S1-102 AI: 7.2 |
agreed | [WTS] [JSN] |
S1-231814 | Presentation of Specification/Report to TSG: TR 22.876 1.1.0 |
TS or TR cover revision of S1-231337 |
Rapporteur (OPPO) | FS_AIML_MT_Ph2 | Rel-19 |
S1-102 AI: 7.6 |
agreed | [WTS] [JSN] | |
S1-231815 | Cover sheet of the TR22.837 for approval |
TS or TR cover revision of S1-231330 revised to S1-231816 |
Rapporteur (Deutsche Telekom) | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
revised | [WTS] [JSN] | |
S1-231816 | Cover sheet of the TR22.837 for approval |
TS or TR cover revision of S1-231815 |
Rapporteur (Deutsche Telekom) | FS_Sensing | Rel-19 |
S1-102 AI: 7.1 |
agreed | [WTS] [JSN] |
817 documents (1.1328480243683 seconds)