Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
RPa160001 Agenda agenda RAN chairman (Qualcomm Incorporated) RP-ah-32008

AI: 3

approved [WTS] [JSN]
RPa160002 Test discussion ETSI FS_NG_SReq Rel-14 RP-ah-32008

AI: 6

withdrawn [WTS] [JSN]
RPa160003 Requirements for Next Generation Access Technologies pCR Deutsche Telekom AG, T-Mobile USA, SK Telecom 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160004 Long Distance Coverage: Requirement for next generation access discussion Telstra Corporation Limited FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

withdrawn [WTS] [JSN]
RPa160005 Requirements for 5G Mobile Broadband discussion Straight Path Communications FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

available [WTS] [JSN]
RPa160006 Discussions on deployment scenarios for eMBB pCR CATT 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

available [WTS] [JSN]
RPa160007 Discussions on deployment scenarios for mMTC and URLLC pCR CATT 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160008 Discussions on technical performance requirements pCR CATT 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160009 Proposed guidelines for TR contents discussion Samsung R&D Institute UK FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

noted [WTS] [JSN]
RPa160010 Handling of dependent KPI's discussion Samsung R&D Institute UK FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

withdrawn [WTS] [JSN]
RPa160011 Initial simulation results discussion Samsung R&D Institute UK FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

available [WTS] [JSN]
RPa160012 Report of RAN email discussion "[Post-RAN#70-01] Scenarios and Requirements for Next Generation Access Technologies report China Mobile Com. Corporation FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

noted [WTS] [JSN]
RPa160013 Skeleton for TR 38.913 v0.0.2 on "Study on Scenarios and Requirements for Next Generation Access Technologies" draft TR

revised to RPa160070

CMCC (rapporteur) FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

revised [WTS] [JSN]
RPa160014 RAN performance targets for new generation access technologies discussion KT Corp. FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160015 RAN architecture requirements for new generation access technologies discussion KT Corp. FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160016 Status of SA1 Study on Stage 1 for New Services and Markets Technology Enablers (SMARTER) discussion SA1 chairman (KPN) FS_SMARTER Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160017 Wireless backhauling consideration pCR

revised to RPa160066

KDDI Corporation 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160018 Text proposal to TR 38.913 on "Study on Scenarios and Requirements for Next Generation Access Technologies" pCR

revised to RPa160067

CMCC, NTT DOCOMO, Ericsson, Huawei, Alcatel-Lucent, Nokia Networks, Qualcomm, Samsung, Intel, SK Telecom, SONY, China Telecommunications, China Unicom 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160019 Discussion on traffic model assumption in IMT-2020 evaluation for ITU-R discussion China Mobile Com. Corporation FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160020 discussion of requirements related with architecture pCR

revised to RP-160237

NEC 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160021 Deployment Scenarios for eMBB discussion ZTE Corporation FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

available [WTS] [JSN]
RPa160022 Consideration on backhaul/fronthaul for eMBB scenarios discussion ZTE Corporation FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160023 Traffic model and mapping between deployment scenarios and specific requirements discussion ZTE Corporation FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160024 Scenarios and Requirements for the IMT-2020 Evaluations discussion Ericsson FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

available [WTS] [JSN]
RPa160025 Text proposal for “7.2 Deployment scenario specific requirements” pCR ZTE Corporation 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160026 text proposal for eMBB related deployment scenarios in Chapter 6 pCR ZTE Corporation 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

available [WTS] [JSN]
RPa160027 A deployment scenario for utility meters discussion IAESI, Thales, Fairspectrum FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160028 Requirements for the architecture of 5G cellular networks pCR IAESI, Thales, Fairspectrum 38.913 0.0.2 FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160029 A proposal for changes to ToC pCR IAESI, Thales, Fairspectrum 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

rejected [WTS] [JSN]
RPa160030 Requirements for Next Generation Access Technologies pCR Dish Network 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160031 Architecture Requirements and Use Cases for Next Generation Access discussion AT&T FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160032 Technical Requirements for Next Generation Radio Access Technologies discussion

revised to RPa160064

AT&T FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160033 Requirements related to RAN architecture for the next generation access pCR Intel Corporation (UK) Ltd 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160034 Requirement on integration and interworking with non-3GPP technologies and networks pCR Intel Corporation, KT Corp. Ltd 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160035 Requirements for next generation access discussion Telstra Corporation Limited FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160036 eMBB in high speed scenarios discussion ETRI FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

available [WTS] [JSN]
RPa160037 SMARTER RAN Requirements discussion Interdigital Asia LLC FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160038 Consideration of Additional requirements for Next Generation Radio Access Technologies pCR ORANGE 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160039 Deployment scenario and requirements for the « Provision of essential services for very low-ARPU areas” discussion ORANGE FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

available [WTS] [JSN]
RPa160040 Text proposal to TR38.913 on Scenarios and Requirements for the "Provision of essential services for very low-ARPU areas" pCR

revised to RPa160073

ORANGE 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160041 Scenario and requirements for eHealth verticals for inclusion in TR38.913 pCR

revised to RPa160074

ORANGE 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160042 Scenario and requirements for Smart Energy verticals for inclusion in TR38.913 pCR

revised to RPa160075

ORANGE 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160043 Discussion on 5G scenarios and requirements pCR Huawei, HiSilicon 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160044 Discussion on M-MTC and URLLC deployment scenarios pCR Huawei, HiSilicon 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160045 Discussion on Dense urban deployment scenario discussion Huawei, HiSilicon FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

available [WTS] [JSN]
RPa160046 Text proposal: long distance coverage requirement for next generation access pCR Telstra, Sprint, Orange, Telefónica, AT&T, Telus, Rogers, C-Spire, SouthernLINC, Bell Mobility 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160047 Views on Use Case Scenarios discussion Alcatel-Lucent Deutschland AG FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

noted [WTS] [JSN]
RPa160048 End-to-End Network Slicing Requirements for Next Generation Access Technologies discussion SK Telecom FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160049 Requirements for C-RAN with flexible function split discussion SK Telecom FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160050 Requirements on RAN management pCR

revised to RPa160069

Telecom Italia, Deutsche Telekom, KDDI, KT, Orange, SK Telecom, Sprint, Telefonica, Vodafone 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160051 Requirements on RAN architecture pCR

revised to RPa160068

Telecom Italia, CMCC, Deutsche Telekom, KDDI, KT, sprint, NTT DOCOMO, Orange, SK Telecom, Sprint, Vodafone 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160052 Text Proposal on RAN Architecture requirements pCR Nokia Networks Oy 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160053 Supporting device-to-device technologies in 5G radio access networks discussion Qualcomm Incorporated FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160054 Considerations on 5G relay requirements discussion

revised to RPa160076

Qualcomm Incorporated FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160055 Considerations on (e)V2X use cases and requirements for 5G discussion Qualcomm Incorporated FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160056 Discussion on requirements on RAN architecture discussion Telecom Italia, CMCC, Deutsche Telekom, KDDI, KT, sprint, NTT DOCOMO, Orange, SK Telecom, Sprint, Vodafone FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160057 Discussion on requirements on RAN management discussion Telecom Italia, Deutsche Telekom, KDDI, KT, Orange, SK Telecom, Sprint, Telefonica, Vodafone FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160058 Discussion on Deployment Scenarios and Requirements for Next Generation Access Technologies pCR LG Electronics Inc. 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160059 Scenario Proposal for Simultaneous Support of Multiple Parameter Sets pCR Sony 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160060 New RAT scenarios and requirements for advanced UE relay pCR Sony 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160061 Handling of “Dependent KPI’s” discussion Ericsson FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160062 Scenario and requirements for Automotive verticals for inclusion in TR38.913 discussion ORANGE; Huawei FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160063 Requirement for next generation access discussion Nokia Networks, Ericsson, Huawei, ITRI, Alcatel-Lucent, NTT DOCOMO FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160064 Technical Requirements for Next Generation Radio Access Technologies discussion

revision of RPa160032

AT&T FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160065 LS on Further elaboration on NGMN requirement metrics and deployment scenarios for 5G (NGMN_LS_160127; to: RAN ad hoc; cc: -; contact: CMCC) LS in

source LS: NGMN_LS_160127

NGMN FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160066 Wireless backhauling consideration pCR

revision of RPa160017

KDDI Corporation 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160067 Text proposal to TR 38.913 on "Study on Scenarios and Requirements for Next Generation Access Technologies" pCR

revision of RPa160018

revised to RPa160072

CMCC, NTT DOCOMO, Ericsson, Huawei, Alcatel-Lucent, Nokia Networks, Qualcomm, Samsung, Intel, SK Telecom, SONY, China Telecommunications, China Unicom 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160068 Requirements on RAN architecture pCR

revision of RPa160051

revised to RPa160078

Telecom Italia, CMCC, Deutsche Telekom, KDDI, KT, sprint, NTT DOCOMO, Orange, SK Telecom, Sprint, Vodafone 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160069 Requirements on RAN management pCR

revision of RPa160050

revised to RPa160079

Telecom Italia, Deutsche Telekom, KDDI, KT, Orange, SK Telecom, Sprint, Telefonica, Vodafone 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160070 Skeleton for TR 38.913 v0.0.3 on "Study on Scenarios and Requirements for Next Generation Access Technologies" draft TR

revision of RPa160013

revised to RPa160071

CMCC (rapporteur) FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

revised [WTS] [JSN]
RPa160071 Skeleton for TR 38.913 v0.1.0 on "Study on Scenarios and Requirements for Next Generation Access Technologies" draft TR

revision of RPa160070

CMCC (rapporteur) FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

agreed [WTS] [JSN]
RPa160072 Text proposal to TR 38.913 on "Study on Scenarios and Requirements for Next Generation Access Technologies" pCR

revision of RPa160067

revised to RPa160077

CMCC, NTT DOCOMO, Ericsson, Huawei, Alcatel-Lucent, Nokia Networks, Qualcomm, Samsung, Intel, SK Telecom, SONY, China Telecommunications, China Unicom 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

revised [WTS] [JSN]
RPa160073 Text proposal to TR38.913 on Scenarios and Requirements for the "Provision of essential services for very low-ARPU areas" pCR

revision of RPa160040

Orange, Telstra, Sprint, Telefonica 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160074 Scenario and requirements for eHealth verticals for inclusion in TR38.913 pCR

revision of RPa160041

Orange, IAESI, Telecom Italia 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160075 Scenario and requirements for Smart Energy verticals for inclusion in TR38.913 pCR

revision of RPa160042

Orange, ABB , IAESI, Telecom Italia, Telia Sonera 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

rejected [WTS] [JSN]
RPa160076 Considerations on 5G relay requirements discussion

revision of RPa160054

Qualcomm Incorporated FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

noted [WTS] [JSN]
RPa160077 Text proposal to TR 38.913 on "Study on Scenarios and Requirements for Next Generation Access Technologies" pCR

revision of RPa160072

CMCC, NTT DOCOMO, Ericsson, Huawei, Alcatel-Lucent, Nokia Networks, Qualcomm, Samsung, Intel, SK Telecom, SONY, China Telecommunications, China Unicom 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

approved [WTS] [JSN]
RPa160078 Requirements on RAN architecture pCR

revision of RPa160068

Telecom Italia, CMCC, Deutsche Telekom, KDDI, KT, sprint, NTT DOCOMO, Orange, SK Telecom, Sprint, Vodafone 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

approved [WTS] [JSN]
RPa160079 Requirements on RAN management pCR

revision of RPa160069

Telecom Italia, Deutsche Telekom, KDDI, KT, Orange, SK Telecom, Sprint, Telefonica, Vodafone 38.913  FS_NG_SReq Rel-14 RP-ah-32008

AI: 5

approved [WTS] [JSN]
RPa160080 TR 38.913 v0.1.1 on Study on Scenarios and Requirements for Next Generation Access Technologies draft TR

revised to RPa160081

CMCC (rapporteur) FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

revised [WTS] [JSN]
RPa160081 TR 38.913 v0.1.2 on Study on Scenarios and Requirements for Next Generation Access Technologies draft TR

revision of RPa160080

revised to RPa160082

CMCC (rapporteur) FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

revised [WTS] [JSN]
RPa160082 TR 38.913 v0.2.0 on Study on Scenarios and Requirements for Next Generation Access Technologies draft TR

revision of RPa160081

CMCC (rapporteur) FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

agreed [WTS] [JSN]
RPa160083 LS on Scenarios and Requirements for Next Generation Access Technologies (to: SA1; cc: SA, SA2; contact: RAN chairman (Qualcomm)) LS out

LS To: SA1

RAN ad hoc FS_NG_SReq Rel-14 RP-ah-32008

AI: 4

approved [WTS] [JSN]
RPa160084 Report of RAN ad hoc on Next Generation Access report ETSI MCC RP-ah-32008

AI: 8

noted [WTS] [JSN]

84 documents (1.0528149604797 seconds)