Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-181750 RAN5#2-5G-NR Adhoc Agenda agenda Motorola Mobility France S.A.S R5-ah-32909

AI: 1

noted [WTS] [JSN]
R5-181751 LS on UE measurements for demodulation test setup in FR2 LS in

source LS: R4-1801809

TSG WG RAN4 R5-ah-32909

AI: 2

noted [WTS] [JSN]
R5-181752 Reply LS on NR interworking with GSM and UMTS LS in

source LS: R4-1802691

TSG WG RAN4 R5-ah-32909

AI: 2

noted [WTS] [JSN]
R5-181753 Reply LS on LTE requirements for EN-DC with NR in FR2 LS in

source LS: R4-1803261

TSG WG RAN4 R5-ah-32909

AI: 2

noted [WTS] [JSN]
R5-181754 Addition of new NR RLC test case 7.2.2.3 pCR

revised to R5-182081

Keysight Technologies UK Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181755 Addition of new NR RLC test case 7.2.2.4 pCR

revised to R5-182082

Keysight Technologies UK Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181756 Addition of new NR RRC test case 8.2.3.17 pCR

revised to R5-182083

Keysight Technologies UK Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181757 Addition of new NR RRC test case 8.2.3.19 pCR

revised to R5-182061

Keysight Technologies UK Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181758 Draft TS 38.521-1 v0.3.0 draft TS

revised to R5-181975

China Unicom 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.7

revised [WTS] [JSN]
R5-181759 Draft TS 38.521-2 v0.3.0 draft TS

revised to R5-181977

CAICT 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.7

revised [WTS] [JSN]
R5-181760 Draft TS 38.521-3 v0.3.0 draft TS Qualcomm UK Ltd 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.7

approved [WTS] [JSN]
R5-181761 Addition of applicability for new NR testcases pCR Keysight Technologies UK Ltd 38.523-2 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.5

withdrawn [WTS] [JSN]
R5-181762 Draft TS 38.523-2 v0.1.0 draft TS Qualcomm 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.7

approved [WTS] [JSN]
R5-181763 Test Setup requirements for OTA testing discussion Keysight Technologies UK Ltd R5-ah-32909

AI: 5.1.19

withdrawn [WTS] [JSN]
R5-181764 5G-NR Text Proposal to update spurious emissions test case to 38.521-2 pCR Qualcomm Europe Inc.(France) 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

withdrawn [WTS] [JSN]
R5-181765 5G-NR: Addition of new FR1 test case for RefSens for SUL operation pCR

revised to R5-182004

Qualcomm Inc 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

revised [WTS] [JSN]
R5-181766 TP for Clause 3 Definitions, symbols and abbreviations pCR

revised to R5-182013

CMCC, Samsung 38.522 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.8

revised [WTS] [JSN]
R5-181767 TP for Clause 4 Recommended test case applicability pCR

revised to R5-182047

CMCC 38.522 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.8

revised [WTS] [JSN]
R5-181768 Baseline of RAN5 5GS draft TSs and core requirement TSs for pCRs to be submitted to the RAN5#2-5G-NR Adhoc other Ericsson R5-ah-32909

AI: 3.7

noted [WTS] [JSN]
R5-181769 Draft TS 38.521-1 v0.4.0 draft TS China Unicom 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-181770 Update of Operating bands and Channel arrangement to TS38.521-1 pCR

revised to R5-182020

China Unicom, CAICT 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

revised [WTS] [JSN]
R5-181771 Introduction of Diversity characteristics to TS38.521-1 pCR China Unicom 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-181772 Draft TS 38.521-3 version 0.4.0 draft TS Qualcomm UK 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

noted [WTS] [JSN]
R5-181773 Draft TS 38.523-3 v0.2.0 draft TS MCC TF160 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-181774 Update chapter for test frequencies pCR SPRINT Corporation 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.3

not pursued [WTS] [JSN]
R5-181775 Draft TS 38.508-1 v0.4.0 draft TS Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

postponed [WTS] [JSN]
R5-181776 Update CellGroupConfig pCR

revised to R5-182109

Ericsson, NTT DOCOMO 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.3

revised [WTS] [JSN]
R5-181777 On the environmental conditions for FR2 discussion

revised to R5-182040

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181778 Analysis of potential RRM 5G NR Test Scenarios for FR2 discussion

revised to R5-182038

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181779 On the RRM Baseline Test Setup for FR2 discussion

revised to R5-182039

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181780 Discussion of NR FR1 Test Point for TX Spurious Emission test cases discussion

revised to R5-182019

Qualcomm Inc. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181781 Discussion on test point selection for NR Frequency Error in FR1 discussion

revised to R5-182024

KDDI Corporation 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181782 Update MIB pCR

revised to R5-182062

Ericsson, NTT DOCOMO 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181783 Introduce radio conditions pCR

revised to R5-182063

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181784 Draft TS 38.522 v0.3.0 draft TS CMCC 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-181785 Considerations for P-Max of UE Maximum Output Power in 5G NR RF conformance spec TS 38.521-1 discussion

revised to R5-182001

CMCC 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181786 Update RRCReconfiguration pCR Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-181787 Add Other information elements pCR

revised to R5-181971

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181788 Update radioBearerConfig pCR

revised to R5-182064

Ericsson, NTT DOCOMO 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181789 5GS PDCP Test case 7.3.4.1 pCR

revised to R5-182076

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181790 5GS PDCP Test case 7.3.5.4 pCR

revised to R5-182077

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181791 5GS RLC test case 7.2.3.11 pCR

revised to R5-182078

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181792 5GS RLC test case 7.2.3.12 pCR

revised to R5-182079

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181793 5G-NR Text Proposal to update spurious emissions test case to 38.521-2 pCR

revised to R5-182027

Qualcomm UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181794 5G-NR Text Proposal to add spurious emissions test case to 38.521-3 pCR

revised to R5-182035

Qualcomm UK Ltd 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

revised [WTS] [JSN]
R5-181795 5G-NR Text Proposal to add REFSENS test case to 38.521-2 pCR

revised to R5-182041

Qualcomm UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181796 5GS RRC TC 8.2.5.5 pCR

revised to R5-182089

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181797 5GS RRC TC 8.2.5.6 pCR

revised to R5-182100

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181798 5GS RRC TC 8.2.5.7 pCR

revised to R5-182101

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181799 5GS RRC TC 8.2.2.2.7 pCR

revised to R5-182102

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181800 5GS RRC TC 8.2.2.2.9 pCR

revised to R5-181980

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181801 Corrections to RRC TC 8.2.5.1 RRC connection reconfiguration / PSCell addition failure pCR

revised to R5-182103

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181802 Corrections to RRC TC 8.2.3.16 Handover with PSCell release / SCG DRB pCR

revised to R5-181981

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181803 Corrections to RRC TC 8.2.2.2.1 PSCell addition, modification and release / SCG DRB pCR

revised to R5-182104

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181804 Corrections to RRC TC 8.2.2.2.6 Bearer Modification / SCG DRB / Split DRB Reconfiguration pCR

revised to R5-182105

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181805 Corrections to RRC TC 8.2.3.1 Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells pCR Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181806 5GS RRC TC 8.2.1.2 pCR Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181807 Update to Operating bands of 38.521-3 pCR Qualcomm UK Ltd 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

approved [WTS] [JSN]
R5-181808 Update to section 3 and section 4 of 38.521-3 pCR Qualcomm UK Ltd 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

approved [WTS] [JSN]
R5-181809 Update chapter 4.5.1 General pCR

revised to R5-182065

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181810 Update RRCConnectionReconfiguration for EN-DC CR Ericsson 36.508 15.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.4

withdrawn [WTS] [JSN]
R5-181811 Update RRCConnectionReconfiguration message for EN-DC CR

revised to R5-182073

Ericsson 36.508 15.1.0 CR#1133 catF 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.

revised [WTS] [JSN]
R5-181812 Update Radio resource control information elements pCR Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-181813 Update RRC IDLE state pCR Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-181814 Text proposal to add clause 4.4 reference system configurations to TS 38.508-1 pCR

revised to R5-182110

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181815 Update RRC CONNECTED state pCR

revised to R5-182066

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181816 5GS RRC TC 8.2.3.2 pCR

revised to R5-181982

Qualcomm Incorporated 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181817 5GS RRC TC 8.2.3.3 pCR

revised to R5-181983

Qualcomm Incorporated 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181818 5GS RRC TC 8.2.3.4 pCR

revised to R5-181984

Qualcomm Incorporated 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181819 5GS RRC TC 8.2.2.2.2 pCR Qualcomm Incorporated 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-181820 Addition of new NR RRC test case 8.2.2.1.2 pCR

revised to R5-181985

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181821 Addition of new NR RRC test case 8.2.2.2.4 pCR

revised to R5-181986

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181822 Addition of new NR RRC test case 8.2.3.7 pCR

revised to R5-182080

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181823 Addition of new NR RRC test case 8.2.3.15 pCR

revised to R5-182084

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181824 Addition of new NR NAS test case for dedicated EPS bearer context activation pCR

revised to R5-181988

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181825 Addition of new NR NAS test case for EPS bearer context modification pCR

revised to R5-181989

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181826 General section updated to 38.521-1 pCR

revised to R5-182005

Bureau Veritas 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

revised [WTS] [JSN]
R5-181827 General section updated to 38.521-2 pCR

revised to R5-182009

Bureau Veritas 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181828 Updated 38.521-3 for channel bandwidth information with new structure pCR Bureau Veritas, Qualcomm 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

approved [WTS] [JSN]
R5-181829 Update of TR 38.903 to introduce information of FR2 MU and TT pCR

revised to R5-182093

Huawei 38.903 0.0.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.14

revised [WTS] [JSN]
R5-181830 Discussion on test point selection for Maximum Output Power in FR1 discussion Huawei 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.4

endorsed [WTS] [JSN]
R5-181831 Discussion on test point selection for Minimum Output Power in FR1 discussion Huawei 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.4

endorsed [WTS] [JSN]
R5-181832 Discussion on test point selection for General ON/OFF Time Mask in FR1 discussion Huawei 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.4

endorsed [WTS] [JSN]
R5-181833 Update of FR1 test cases 6.2.1, 6.3.1 and 6.3.3.2 pCR Huawei 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-181834 Addition of FR2 test case 6.3.1 Minimum Output Power pCR

revised to R5-182048

Huawei 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181835 Addition of FR2 test case 6.3.3.2 General ON/OFF time mask pCR

revised to R5-182049

Huawei 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181836 Draft TR 38.903 v0.1.0 draft TR Huawei 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-181837 Draft TS 38.523-2 v0.2.0 draft TS Qualcomm Incorporated 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-181838 Addition of applicability for new 5GS test cases pCR Qualcomm Incorporated 38.523-2 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.5

approved [WTS] [JSN]
R5-181839 Definitions and abbreviations updated to 38.521-2 pCR CAICT 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-181840 Operating bands and Channel arrangement updated to 38.521-2 pCR CAICT 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-181841 Introduction of new test case 7.4 Maximum input level pCR

revised to R5-182008

CAICT 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181842 Corrections of minimum conformance requirements and test requirement for 6.3.2 Transmit OFF power pCR CAICT 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-181843 Discussion on NR FR2 RF test spec progress discussion CAICT 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-181844 Draft TS 38.521-2 v0.4.0 draft TS CAICT 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-181845 Update chapter for test frequencies - FR2 pCR SPRINT Corporation 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.3

not pursued [WTS] [JSN]
R5-181846 Update chapter for test frequencies - EN-DC pCR SPRINT Corporation 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.3

not pursued [WTS] [JSN]
R5-181847 5G-NR: FR1 text_update for test_case 6.5.3.2 Spurious emissions for UE co-existence pCR

revised to R5-182000

Qualcomm Inc 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

revised [WTS] [JSN]
R5-181848 Corrections of minimum conformance requirements and test requirement for 6.2.2 Maximum Power Reduction pCR

revised to R5-182021

CAICT 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

revised [WTS] [JSN]
R5-181849 Discussion on test procedure for waveform selection for NSA discussion

revised to R5-182012

Ericsson 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181850 RAN5 5GS work item AP list (pre-RAN5#2-5G-NR-Adhoc) other Ericsson R5-ah-32909

AI: 3.8

noted [WTS] [JSN]
R5-181851 RAN5 5GS work item AP list (post-RAN5#2-5G-NR-Adhoc) other Ericsson R5-ah-32909

AI: 6.5

noted [WTS] [JSN]
R5-181852 WP UE Conformance Test Aspects - 5G system with NR and LTE Work Plan Ericsson R5-ah-32909

AI: 6.5

noted [WTS] [JSN]
R5-181853 Meeting minutes RAN WG5 5GS OTA for SIG webinar#1, March 22, 2018 report Ericsson 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 3.8

noted [WTS] [JSN]
R5-181854 5GS discussion paper on protocol testing using OTA UE and SS calibration method discussion Ericsson 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 6.3

noted [WTS] [JSN]
R5-181855 5GS discussion paper on NR Layer 1 and 2 parameters discussion Ericsson 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 6.3

noted [WTS] [JSN]
R5-181856 TP for new test case: 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC pCR

revised to R5-182016

Ericsson 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

revised [WTS] [JSN]
R5-181857 Text proposal to add UE functional blockdiagram for UE test loop modes A and B pCR

revised to R5-182071

Ericsson 38.509 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.3

revised [WTS] [JSN]
R5-181858 TP for defintion of physcial channel allocations in 38.508-1 pCR

revised to R5-182067

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181859 On the treatment of the low frequency range for FR2 Spurious Test discussion Anritsu R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181860 Proposal on the FR2 TRx spurious test procedure discussion

revised to R5-182032

Anritsu R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181861 Proposal for uncertainty of Sub-6GHz NR TRx tests discussion

revised to R5-182034

Anritsu R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181862 On the LTE anchor link power level for TRx OTA tests discussion

revised to R5-182090

Anritsu R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181863 On extreme condition test for FR2 TRx discussion Anritsu R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-181864 TP for power level pCR Anritsu 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

withdrawn [WTS] [JSN]
R5-181865 Priority of the RF test cases about MU and TT discussion discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-181866 Priority of the test setup about defining MU discussion

revised to R5-182007

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181867 Time plan for defining MU and TT for RF tests discussion

revised to R5-182092

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181868 Remaining issue about defining FR2 Test Tolerance discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-181869 Draft TS 38.509 v0.3.0 draft TS Samsung 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-181870 5G work planning after RAN5#2-5G-NR Adhoc other Samsung 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 6.5

noted [WTS] [JSN]
R5-181871 Update of default NAS messages to add ENDC IEs CR

revised to R5-182074

Samsung 36.508 15.1.0 CR#1134 catF 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.

revised [WTS] [JSN]
R5-181872 Way Forward with ENDC EPC test cases discussion Samsung 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 5.1.19

noted [WTS] [JSN]
R5-181873 Update of 38.509 general sections pCR

revised to R5-182070

Samsung 38.509 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.3

revised [WTS] [JSN]
R5-181874 Addition of text to clarify that 5GS requirements may be implicitly tested in other specs pCR

revised to R5-181991

Samsung 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181875 Test Tolerance defining approach about FR2 RF tests discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-181876 Applicability of the shared risk principle for FR2 RF tests discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-181877 TP for clauses of signal level pCR

revised to R5-182091

Anritsu 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181878 Testing time estimation about FR2 RF tests discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-181879 Discussion on test point selection for NR In-Band in FR1 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181880 Discussion on test point selection for NR ACS in FR1 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181881 Overview Of TRP uncertainty vs sampling grid at mmWave agenda MVG Industries R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181882 Addition of new TC for Attach / Success / DCNR pCR NTT DOCOMO INC. 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-181883 Addition of new test applicability for Attach / Success / DCNR pCR NTT DOCOMO INC. 38.523-2 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.5

withdrawn [WTS] [JSN]
R5-181884 Update SIB2 message for NR CR NTT DOCOMO INC. 36.508 15.1.0 CR#1135 catF 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.

agreed [WTS] [JSN]
R5-181885 EN-DC: Addition of Test Model aspects pCR

revised to R5-182072

MCC TF160 38.523-3 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.6

revised [WTS] [JSN]
R5-181886 TP to update clause 6.2B.3.1 UE A-MPR intra-band EN-DC to 38.521-3 pCR

revised to R5-182017

Ericsson LM 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

revised [WTS] [JSN]
R5-181887 TP to update clause 6.5B.2.1.2 Additional spectrum emission mask to 38.521-3 pCR

revised to R5-182018

Ericsson LM 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

revised [WTS] [JSN]
R5-181888 Discussion on handling of test point analysis discussion Ericsson LM 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181889 TP to update TR 38.905 with information on test point analysis pCR Ericsson LM 38.905 0.0.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.15

approved [WTS] [JSN]
R5-181890 TP for updating of Downlink physical layer parameters pCR

revised to R5-181972

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181891 New NAS test case EPS bearer resource allocation / New EPS bearer context pCR

revised to R5-181992

Ericsson, Tech Mahindra 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181892 New NAS test case EPS bearer resource modification / New EPS bearer context pCR

revised to R5-181993

Ericsson 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181893 Addition of UE capability information elements pCR Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-181894 Initial NR ASP definitions discussion MCC TF160 R5-ah-32909

AI: 5.1.19

noted [WTS] [JSN]
R5-181895 TP for adding Mid channel BW definition in TS 38.508-1 pCR

revised to R5-181973

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181896 Introduction of 5GS RRC TC 8.2.4.3.1 pCR

revised to R5-182115

Huawei 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181897 Addition of MeasObject and MeasReport for NR CR

revised to R5-182075

Huawei 36.508 15.1.0 CR#1136 catF 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.

revised [WTS] [JSN]
R5-181898 Addition of SpCellConfig pCR Huawei 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.1

withdrawn [WTS] [JSN]
R5-181899 EN-DC: Initial EUTRA ASP updates discussion MCC TF160 R5-ah-32909

AI: 5.1.19

noted [WTS] [JSN]
R5-181900 TP for 7.6.2 InBand Blocking in TS 38.521-1 pCR

revised to R5-182002

Keysight Technologies UK Ltd 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

revised [WTS] [JSN]
R5-181901 Basic assumptions for the FR2 MU and TT work discussion

revised to R5-182006

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181902 EN-DC testing discussion Ericsson R5-ah-32909

AI: 3.6

noted [WTS] [JSN]
R5-181903 TP for 7.5 Adjacent Channel Selectivity in TS 38.521-1 pCR

revised to R5-182003

Keysight Technologies UK Ltd 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

revised [WTS] [JSN]
R5-181904 Common uplink configuration table for Tx test cases for TS 38.521-2 non-CA pCR

revised to R5-182010

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181905 Discussion on test point selection for NR Occupied Bandwidth in FR2 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181906 Discussion on test point selection for NR SEM in FR2 discussion

revised to R5-182028

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181907 Discussion on test point selection for NR ACLR in FR2 discussion

revised to R5-182030

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181908 Discussion on test point selection for NR In-Band blocking in FR2 discussion

revised to R5-182042

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181909 Adding NR test case 8.2.2.1.1 pCR

revised to R5-182116

MediaTek Inc. 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181910 Discussion on test point selection for NR ACS in FR2 discussion

revised to R5-182044

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181911 Handling of the Extreme condition about FR2 RF tests discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

withdrawn [WTS] [JSN]
R5-181912 Addition of 5GS NR RRC test case 8.2.1.1 pCR ROHDE & SCHWARZ 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-181913 Addition of 5GS NR RRC test case 8.2.2.2.3 pCR ROHDE & SCHWARZ 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

not pursued [WTS] [JSN]
R5-181914 Addition of 5GS NR RRC test case 8.2.3.6 pCR ROHDE & SCHWARZ 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.2

approved [WTS] [JSN]
R5-181915 Addition of 5GS NR RRC test case 8.2.3.8 pCR ROHDE & SCHWARZ 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

not pursued [WTS] [JSN]
R5-181916 draft TS 38.523-1 v0.3.0 (after RAN5 #2 5G-NR Adhoc) draft TS ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-181917 Adding NR test case 8.2.2.1.3 pCR

revised to R5-182117

MediaTek Inc. 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181918 Discussion on test procedure for NR Occupied Bandwidth in FR2 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181919 Discussion on test procedure for NR SEM in FR2 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181920 Discussion on test procedure for NR ACLR in FR2 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181921 Addition of 5GS NR PDCP test case 7.3.5.3 pCR ROHDE & SCHWARZ 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-181922 TP for 6.5.1 Occupied Bandwidth in TS 38.521-2 pCR

revised to R5-182011

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181923 TP for 6.5.2.1 Spectrum Emission Mask in TS 38.521-2 pCR

revised to R5-182029

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181924 TP for 6.5.2.3 Adjacent Channel Leakage Ratio in TS 38.521-2 pCR

revised to R5-182031

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181925 Adding NR test case 8.2.2.2.8 pCR

revised to R5-182118

MediaTek Inc. 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181926 TP for 7.6.2 InBand Blocking in TS 38.521-2 pCR

revised to R5-182043

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181927 TP for 7.5 Adjacent channel selectivity in TS 38.521-2 pCR

revised to R5-182046

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

revised [WTS] [JSN]
R5-181928 Discussion on MU in NR FR2 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-181929 Comparison of NR UL Signal CCDFs discussion Intel Deutschland GmbH 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-181930 Discussion on how to consider permitted testing methodologies within test procedures in TS 38.521-2 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-181931 Discussion on how to consider UE antenna implementation versus permitted test method discussion

revised to R5-182033

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181932 Handling of IMS PDN in 5G NR NSA mode discussion

revised to R5-182088

Qualcomm Wireless GmbH R5-ah-32909

AI: 5.1.19

revised [WTS] [JSN]
R5-181933 Test and Applicability Consideration for FR1 and FR2 discussion Qualcomm Wireless GmbH R5-ah-32909

AI: 5.1.19

noted [WTS] [JSN]
R5-181934 Test Case Classification and Measurement Requirement for SIG OTA discussion

revised to R5-182111

Qualcomm Wireless GmbH R5-ah-32909

AI: 5.1.19

revised [WTS] [JSN]
R5-181935 Addition of new NR RRC test case 8.2.5.4 pCR

revised to R5-181987

Intel Corporation (UK) Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181936 Addition of applicability of new NR test case 8.2.5.4 pCR Intel Corporation (UK) Ltd 38.523-2 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.5

withdrawn [WTS] [JSN]
R5-181937 Rel-15 Mar'18 baseline upgrade for type definitions discussion

revised to R5-182087

MCC TF160 R5-ah-32909

AI: 5.1.19

revised [WTS] [JSN]
R5-181938 Discussion on test point selection for NR Frequency Error in FR1 discussion

revised to R5-182025

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181939 TP for new TC: 6.4.1 Frequency error pCR

revised to R5-182026

ROHDE & SCHWARZ 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

revised [WTS] [JSN]
R5-181940 Discussion paper on test procedure for mmWave Demod testing discussion

revised to R5-182036

Qualcomm Europe Inc.(France) 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181941 Discussion paper on signaling the RSRPB UE reporting requirements discussion

revised to R5-182014

Qualcomm Europe Inc.(France) 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-181942 Addition of new NR MAC test case 7.1.4.1.1 pCR

revised to R5-181994

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181943 Addition of new NR MAC test case 7.1.4.1.2 pCR

revised to R5-181995

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181944 Addition of new NR RLC test case 7.2.3.5 pCR

revised to R5-181999

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181945 Addition of new NR RLC test case 7.2.2.5 pCR

revised to R5-182050

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181946 Addition of new NR RLC test case 7.2.2.6 pCR

revised to R5-181998

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181947 Addition of new NR RLC test case 7.2.3.6 pCR

revised to R5-182051

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181948 Addition of new NR RLC test case 7.2.3.7 pCR

revised to R5-182052

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181949 Addition of new NR RLC test case 7.2.3.8 pCR

revised to R5-182053

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181950 Addition of new NR RLC test case 7.2.3.9 pCR Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-181951 Correction to RLC UM Test cases pCR Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181952 Correction to RLC AM Test cases pCR Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181953 Correction to PDCP integrity protection test cases pCR

revised to R5-182085

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181954 Draft TR 38.905 v0.1.0 draft TR Ericsson LM 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-181955 Addition of new NR RLC test case 7.2.3.3 pCR

revised to R5-182054

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181956 Addition of new NR RLC test case 7.2.3.4 pCR

revised to R5-182055

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181957 Addition of new NR PDCP test case 7.3.5.5 pCR ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-181958 Addition of new NR RRC test case 8.2.3.9 pCR

revised to R5-182056

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181959 Addition of new NR RRC test case 8.2.3.10 pCR

revised to R5-182057

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181960 Addition of new NR RRC test case 8.2.3.11 pCR

revised to R5-182058

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181961 Addition of new NR RRC test case 8.2.3.12 pCR

revised to R5-182059

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181962 Add applicability for new NR testcases pCR

revised to R5-182086

ANRITSU LTD 38.523-2 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.5

revised [WTS] [JSN]
R5-181963 RAN5#2 5G-NR Adhoc Session Programme agenda RAN5 Chair R5-ah-32909

AI: 1

noted [WTS] [JSN]
R5-181964 RAN Plenary#79 5G-NR Summary Notes report RAN5 Chair R5-ah-32909

AI: 1

noted [WTS] [JSN]
R5-181965 Addition of new NR MAC test case 7.1.4.1.3 pCR

revised to R5-181996

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181966 Addition of new NR MAC test case 7.1.4.1.4 pCR

revised to R5-181997

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181967 Correction to PDCP ciphering test cases pCR Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181968 Correction to MAC test case 7.1.2.1 pCR

revised to R5-182060

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181969 Addition of several required PICS pCR

revised to R5-182069

Motorola Mobility 38.508-2 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.2

revised [WTS] [JSN]
R5-181970 Draft TS 38.508-2 v0.2.0 draft TS Motorola Mobility 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

noted [WTS] [JSN]
R5-181971 Add Other information elements pCR

revision of R5-181787

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-181972 TP for updating of Downlink physical layer parameters pCR

revision of R5-181890

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.3

approved [WTS] [JSN]
R5-181973 TP for adding Mid channel BW definition in TS 38.508-1 pCR

revision of R5-181895

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-181974 Addition of SRB3 pCR Ericsson, MediaTek Inc., NTT DOCOMO, INC. 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-181975 Draft TS 38.521-1 v0.3.0 draft TS

revision of R5-181758

China Unicom 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.7

withdrawn [WTS] [JSN]
R5-181976 Draft TS 38.521-1 v0.3.0 draft TS China Unicom 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.7

approved [WTS] [JSN]
R5-181977 Draft TS 38.521-2 v0.3.0 draft TS

revision of R5-181759

CAICT 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.7

withdrawn [WTS] [JSN]
R5-181978 Draft TS 38.521-2 v0.3.0 draft TS CAICT 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.7

approved [WTS] [JSN]
R5-181979 Update of PRD13 to include 5G relevant agreements on how to write test relevant content into the test specs other

revised to R5-182112

Samsung 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.8

revised [WTS] [JSN]
R5-181980 5GS RRC TC 8.2.2.2.9 pCR

revision of R5-181800

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181981 Corrections to RRC TC 8.2.3.16 Handover with PSCell release / SCG DRB pCR

revision of R5-181802

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181982 5GS RRC TC 8.2.3.2 pCR

revision of R5-181816

Qualcomm Incorporated 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181983 5GS RRC TC 8.2.3.3 pCR

revision of R5-181817

Qualcomm Incorporated 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181984 5GS RRC TC 8.2.3.4 pCR

revision of R5-181818

Qualcomm Incorporated 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181985 Addition of new NR RRC test case 8.2.2.1.2 pCR

revision of R5-181820

revised to R5-182106

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

revised [WTS] [JSN]
R5-181986 Addition of new NR RRC test case 8.2.2.2.4 pCR

revision of R5-181821

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181987 Addition of new NR RRC test case 8.2.5.4 pCR

revision of R5-181935

Intel Corporation (UK) Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-181988 Addition of new NR NAS test case for dedicated EPS bearer context activation pCR

revision of R5-181824

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181989 Addition of new NR NAS test case for EPS bearer context modification pCR

revision of R5-181825

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-181990 Update MeasConfig information elements pCR

revised to R5-182068

NTT DOCOMO, INC. 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

revised [WTS] [JSN]
R5-181991 Addition of text to clarify that 5GS requirements may be implicitly tested in other specs pCR

revision of R5-181874

Samsung 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181992 New NAS test case EPS bearer resource allocation / New EPS bearer context pCR

revision of R5-181891

Ericsson, Tech Mahindra 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181993 New NAS test case EPS bearer resource modification / New EPS bearer context pCR

revision of R5-181892

Ericsson 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-181994 Addition of new NR MAC test case 7.1.4.1.1 pCR

revision of R5-181942

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181995 Addition of new NR MAC test case 7.1.4.1.2 pCR

revision of R5-181943

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181996 Addition of new NR MAC test case 7.1.4.1.3 pCR

revision of R5-181965

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181997 Addition of new NR MAC test case 7.1.4.1.4 pCR

revision of R5-181966

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181998 Addition of new NR RLC test case 7.2.2.6 pCR

revision of R5-181946

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-181999 Addition of new NR RLC test case 7.2.3.5 pCR

revision of R5-181944

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182000 5G-NR: FR1 text_update for test_case 6.5.3.2 Spurious emissions for UE co-existence pCR

revision of R5-181847

Qualcomm Inc 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-182001 Considerations for P-Max of UE Maximum Output Power in 5G NR RF conformance spec TS 38.521-1 discussion

revision of R5-181785

revised to R5-182015

CMCC 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

revised [WTS] [JSN]
R5-182002 TP for 7.6.2 InBand Blocking in TS 38.521-1 pCR

revision of R5-181900

Keysight Technologies UK Ltd 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-182003 TP for 7.5 Adjacent Channel Selectivity in TS 38.521-1 pCR

revision of R5-181903

Keysight Technologies UK Ltd 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-182004 5G-NR: Addition of new FR1 test case for RefSens for SUL operation pCR

revision of R5-181765

Qualcomm Inc 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-182005 General section updated to 38.521-1 pCR

revision of R5-181826

Bureau Veritas 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-182006 Basic assumptions for the FR2 MU and TT work discussion

revision of R5-181901

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-182007 Priority of the test setup about defining MU discussion

revision of R5-181866

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-182008 Introduction of new test case 7.4 Maximum input level pCR

revision of R5-181841

CAICT 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182009 General section updated to 38.521-2 pCR

revision of R5-181827

Bureau Veritas 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182010 Common uplink configuration table for Tx test cases for TS 38.521-2 non-CA pCR

revision of R5-181904

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182011 TP for 6.5.1 Occupied Bandwidth in TS 38.521-2 pCR

revision of R5-181922

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182012 Discussion on test procedure for waveform selection for NSA discussion

revision of R5-181849

Ericsson 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182013 TP for Clause 3 Definitions, symbols and abbreviations pCR

revision of R5-181766

CMCC, Samsung 38.522 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.8

approved [WTS] [JSN]
R5-182014 Discussion paper on signaling the RSRPB UE reporting requirements discussion

revision of R5-181941

Qualcomm Europe Inc.(France) 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182015 Considerations for P-Max of UE Maximum Output Power in 5G NR RF conformance spec TS 38.521-1 discussion

revision of R5-182001

CMCC 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-182016 TP for new test case: 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC pCR

revision of R5-181856

Ericsson 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

approved [WTS] [JSN]
R5-182017 TP to update clause 6.2B.3.1 UE A-MPR intra-band EN-DC to 38.521-3 pCR

revision of R5-181886

Ericsson LM 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

approved [WTS] [JSN]
R5-182018 TP to update clause 6.5B.2.1.2 Additional spectrum emission mask to 38.521-3 pCR

revision of R5-181887

Ericsson LM 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

approved [WTS] [JSN]
R5-182019 Discussion of NR FR1 Test Point for TX Spurious Emission test cases discussion

revision of R5-181780

Qualcomm Inc. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182020 Update of Operating bands and Channel arrangement to TS38.521-1 pCR

revision of R5-181770

China Unicom, CAICT 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-182021 Corrections of minimum conformance requirements and test requirement for 6.2.2 Maximum Power Reduction pCR

revision of R5-181848

CAICT 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-182022 Clarifications on the applicable requirements of the PC2 UE LS out

LS To: TSG WG RAN4

TSG WG RAN5 R5-ah-32909

AI: 6.6

approved [WTS] [JSN]
R5-182023 Text Proposal on SS-RSRPB UE reporting pCR

revised to R5-182037

Qualcomm Inc 38.509 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.3

revised [WTS] [JSN]
R5-182024 Discussion on test point selection for NR Frequency Error in FR1 discussion

revision of R5-181781

KDDI Corporation 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182025 Discussion on test point selection for NR Frequency Error in FR1 discussion

revision of R5-181938

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182026 TP for new TC: 6.4.1 Frequency error pCR

revision of R5-181939

ROHDE & SCHWARZ 38.521-1 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.4

approved [WTS] [JSN]
R5-182027 5G-NR Text Proposal to update spurious emissions test case to 38.521-2 pCR

revision of R5-181793

Qualcomm UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182028 Discussion on test point selection for NR SEM in FR2 discussion

revision of R5-181906

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-182029 TP for 6.5.2.1 Spectrum Emission Mask in TS 38.521-2 pCR

revision of R5-181923

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182030 Discussion on test point selection for NR ACLR in FR2 discussion

revision of R5-181907

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182031 TP for 6.5.2.3 Adjacent Channel Leakage Ratio in TS 38.521-2 pCR

revision of R5-181924

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182032 Proposal on the FR2 TRx spurious test procedure discussion

revision of R5-181860

Anritsu R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182033 Discussion on how to consider UE antenna implementation versus permitted test method discussion

revision of R5-181931

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-182034 Proposal for uncertainty of Sub-6GHz NR TRx tests discussion

revision of R5-181861

Anritsu R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-182035 5G-NR Text Proposal to add spurious emissions test case to 38.521-3 pCR

revision of R5-181794

Qualcomm UK Ltd 38.521-3 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.6

approved [WTS] [JSN]
R5-182036 Discussion paper on test procedure for mmWave Demod testing discussion

revision of R5-181940

Qualcomm Europe Inc.(France) 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182037 Text Proposal on SS-RSRPB UE reporting pCR

revision of R5-182023

Qualcomm Inc 38.509 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.3

approved [WTS] [JSN]
R5-182038 Analysis of potential RRM 5G NR Test Scenarios for FR2 discussion

revision of R5-181778

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-182039 On the RRM Baseline Test Setup for FR2 discussion

revision of R5-181779

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

noted [WTS] [JSN]
R5-182040 On the environmental conditions for FR2 discussion

revision of R5-181777

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182041 5G-NR Text Proposal to add REFSENS test case to 38.521-2 pCR

revision of R5-181795

Qualcomm UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182042 Discussion on test point selection for NR In-Band blocking in FR2 discussion

revision of R5-181908

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182043 TP for 7.6.2 InBand Blocking in TS 38.521-2 pCR

revision of R5-181926

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182044 Discussion on test point selection for NR ACS in FR2 discussion

revision of R5-181910

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182045 LS on Measurement Uncertainty Definition Responsibilities LS out

LS To: TSG WG RAN4

TSG WG RAN5 R5-ah-32909

AI: 6.6

approved [WTS] [JSN]
R5-182046 TP for 7.5 Adjacent channel selectivity in TS 38.521-2 pCR

revision of R5-181927

Keysight Technologies UK Ltd 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182047 TP for Clause 4 Recommended test case applicability pCR

revision of R5-181767

CMCC 38.522 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.8

approved [WTS] [JSN]
R5-182048 Addition of FR2 test case 6.3.1 Minimum Output Power pCR

revision of R5-181834

Huawei 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182049 Addition of FR2 test case 6.3.3.2 General ON/OFF time mask pCR

revision of R5-181835

Huawei 38.521-2 0.3.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.5

approved [WTS] [JSN]
R5-182050 Addition of new NR RLC test case 7.2.2.5 pCR

revision of R5-181945

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182051 Addition of new NR RLC test case 7.2.3.6 pCR

revision of R5-181947

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182052 Addition of new NR RLC test case 7.2.3.7 pCR

revision of R5-181948

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182053 Addition of new NR RLC test case 7.2.3.8 pCR

revision of R5-181949

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182054 Addition of new NR RLC test case 7.2.3.3 pCR

revision of R5-181955

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182055 Addition of new NR RLC test case 7.2.3.4 pCR

revision of R5-181956

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182056 Addition of new NR RRC test case 8.2.3.9 pCR

revision of R5-181958

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182057 Addition of new NR RRC test case 8.2.3.10 pCR

revision of R5-181959

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182058 Addition of new NR RRC test case 8.2.3.11 pCR

revision of R5-181960

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182059 Addition of new NR RRC test case 8.2.3.12 pCR

revision of R5-181961

ANRITSU LTD 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182060 Correction to MAC test case 7.1.2.1 pCR

revision of R5-181968

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182061 Addition of new NR RRC test case 8.2.3.19 pCR

revision of R5-181757

Keysight Technologies UK Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182062 Update MIB pCR

revision of R5-181782

Ericsson, NTT DOCOMO 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-182063 Introduce radio conditions pCR

revision of R5-181783

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-182064 Update radioBearerConfig pCR

revision of R5-181788

Ericsson, NTT DOCOMO 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-182065 Update chapter 4.5.1 General pCR

revision of R5-181809

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-182066 Update RRC CONNECTED state pCR

revision of R5-181815

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-182067 TP for defintion of physcial channel allocations in 38.508-1 pCR

revision of R5-181858

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-182068 Update MeasConfig information elements pCR

revision of R5-181990

NTT DOCOMO, INC., INC., Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-182069 Addition of several required PICS pCR

revision of R5-181969

Motorola Mobility 38.508-2 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.2

approved [WTS] [JSN]
R5-182070 Update of 38.509 general sections pCR

revision of R5-181873

Samsung 38.509 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.3

approved [WTS] [JSN]
R5-182071 Text proposal to add UE functional blockdiagram for UE test loop modes A and B pCR

revision of R5-181857

Ericsson 38.509 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.3

approved [WTS] [JSN]
R5-182072 EN-DC: Addition of Test Model aspects pCR

revision of R5-181885

MCC TF160 38.523-3 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.6

approved [WTS] [JSN]
R5-182073 Update RRCConnectionReconfiguration message for EN-DC CR

revision of R5-181811

Ericsson 36.508 15.1.0 CR#11331 catF 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.

agreed [WTS] [JSN]
R5-182074 Update of default NAS messages to add ENDC IEs CR

revision of R5-181871

Samsung, TF160 36.508 15.1.0 CR#11341 catF 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.

agreed [WTS] [JSN]
R5-182075 Addition of MeasObject and MeasReport for NR CR

revision of R5-181897

Huawei 36.508 15.1.0 CR#11361 catF 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.

agreed [WTS] [JSN]
R5-182076 5GS PDCP Test case 7.3.4.1 pCR

revision of R5-181789

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182077 5GS PDCP Test case 7.3.5.4 pCR

revision of R5-181790

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182078 5GS RLC test case 7.2.3.11 pCR

revision of R5-181791

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182079 5GS RLC test case 7.2.3.12 pCR

revision of R5-181792

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182080 Addition of new NR RRC test case 8.2.3.7 pCR

revision of R5-181822

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182081 Addition of new NR RLC test case 7.2.2.3 pCR

revision of R5-181754

Keysight Technologies UK Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182082 Addition of new NR RLC test case 7.2.2.4 pCR

revision of R5-181755

Keysight Technologies UK Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182083 Addition of new NR RRC test case 8.2.3.17 pCR

revision of R5-181756

Keysight Technologies UK Ltd 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182084 Addition of new NR RRC test case 8.2.3.15 pCR

revision of R5-181823

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

withdrawn [WTS] [JSN]
R5-182085 Correction to PDCP integrity protection test cases pCR

revision of R5-181953

Motorola Mobility 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182086 Add applicability for new NR testcases pCR

revision of R5-181962

ANRITSU LTD 38.523-2 0.1.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.5

withdrawn [WTS] [JSN]
R5-182087 Rel-15 Mar'18 baseline upgrade for type definitions discussion

revision of R5-181937

MCC TF160 R5-ah-32909

AI: 5.1.19

noted [WTS] [JSN]
R5-182088 Handling of IMS PDN in 5G NR NSA mode discussion

revision of R5-181932

Qualcomm Wireless GmbH R5-ah-32909

AI: 5.1.19

noted [WTS] [JSN]
R5-182089 5GS RRC TC 8.2.5.5 pCR

revision of R5-181796

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182090 On the LTE anchor link power level for TRx OTA tests discussion

revision of R5-181862

Anritsu R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182091 TP for clauses of signal level pCR

revision of R5-181877

Anritsu 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-182092 Time plan for defining MU and TT for RF tests discussion

revision of R5-181867

NTT DOCOMO, INC., Anritsu, CAICT, CMCC, Huawei, KDDI Corporation, Keysight Technologies UK Ltd, MVG Industries, PCTEST Engineering Lab, ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.16

endorsed [WTS] [JSN]
R5-182093 Update of TR 38.903 to introduce information of FR2 MU and TT pCR

revision of R5-181829

Huawei 38.903 0.0.1 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 4.1.14

approved [WTS] [JSN]
R5-182094 Notification of critical dependencies (UL/DL RMC, OCNG Patterns) missing in RAN4 specifications LS out

LS To: TSG WG RAN4

TSG WG RAN5 5GS_NR_LTE-UEConTest R5-ah-32909

AI: 6.6

approved [WTS] [JSN]
R5-182095 Proposal for update of RAN5 5G NR phases and targets other

revised to R5-182113

Ericsson R5-ah-32909

AI: 6.4

revised [WTS] [JSN]
R5-182096 Draft TS 38.521-4 v0.1.0 draft TS Qualcomm Inc. 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-182100 5GS RRC TC 8.2.5.6 pCR

revision of R5-181797

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182101 5GS RRC TC 8.2.5.7 pCR

revision of R5-181798

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182102 5GS RRC TC 8.2.2.2.7 pCR

revision of R5-181799

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182103 Corrections to RRC TC 8.2.5.1 RRC connection reconfiguration / PSCell addition failure pCR

revision of R5-181801

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182104 Corrections to RRC TC 8.2.2.2.1 PSCell addition, modification and release / SCG DRB pCR

revision of R5-181803

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182105 Corrections to RRC TC 8.2.2.2.6 Bearer Modification / SCG DRB / Split DRB Reconfiguration pCR

revision of R5-181804

Qualcomm Wireless GmbH 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182106 Addition of new NR RRC test case 8.2.2.1.2 pCR

revision of R5-181985

Tech Mahindra Limited 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182107 LS on IMS Voice over NR in EN-DC LS out

LS To: TSG WG RAN2

TSG WG RAN5 R5-ah-32909

AI: 6.6

approved [WTS] [JSN]
R5-182108 Test frequencies in 38.508-1 discussion Sprint R5-ah-32909

AI: 6.4

noted [WTS] [JSN]
R5-182109 Update CellGroupConfig pCR

revision of R5-181776

Ericsson, NTT DOCOMO 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.3

approved [WTS] [JSN]
R5-182110 Text proposal to add clause 4.4 reference system configurations to TS 38.508-1 pCR

revision of R5-181814

Ericsson 38.508-1 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.1

approved [WTS] [JSN]
R5-182111 Test Case Classification and Measurement Requirement for SIG OTA discussion

revision of R5-181934

Qualcomm Wireless GmbH R5-ah-32909

AI: 5.1.19

noted [WTS] [JSN]
R5-182112 Update of PRD13 to include 5G relevant agreements on how to write test relevant content into the test specs other

revision of R5-181979

Samsung 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.8

approved [WTS] [JSN]
R5-182113 Proposal for update of RAN5 5G NR phases and targets other

revision of R5-182095

Ericsson R5-ah-32909

AI: 6.4

postponed [WTS] [JSN]
R5-182115 Introduction of 5GS RRC TC 8.2.4.3.1 pCR

revision of R5-181896

Huawei 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.2

approved [WTS] [JSN]
R5-182116 Adding NR test case 8.2.2.1.1 pCR

revision of R5-181909

MediaTek Inc. 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182117 Adding NR test case 8.2.2.1.3 pCR

revision of R5-181917

MediaTek Inc. 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

approved [WTS] [JSN]
R5-182118 Adding NR test case 8.2.2.2.8 pCR

revision of R5-181925

MediaTek Inc. 38.523-1 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 5.1.4

not pursued [WTS] [JSN]
R5-182119 draft RAN5#2 5G-NR Adhoc meeting report report ETSI Secretariat R5-ah-32909

AI: 6.7

noted [WTS] [JSN]
R5-182120 Draft TS 38.508-2 v0.2.1 draft TS Motorola Mobility 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 6.9

approved [WTS] [JSN]
R5-182121 Draft TS 38.521-3 v0.4.1 draft TS Qualcomm UK Ltd 5GS_NR_LTE-UEConTest Rel-15 R5-ah-32909

AI: 3.7

approved [WTS] [JSN]

368 documents (1.1036789417267 seconds)