Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-223900 | Agenda - opening session |
agenda revised to R5-224932 |
WG Chairman |
R5-96-e AI: 1 |
revised | [WTS] [JSN] | |||
R5-223901 | RAN5#96-e E-Meeting Timelines, Scope, Process | agenda | WG Chairman |
R5-96-e AI: 1 |
endorsed | [WTS] [JSN] | |||
R5-223902 | RAN5 Leadership Team | other | WG Chairman |
R5-96-e AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-223903 | RAN5#95-e WG Minutes | report | ETSI Secretariat |
R5-96-e AI: 2.1 |
approved | [WTS] [JSN] | |||
R5-223904 | RAN5#95-e WG Action Points | report | ETSI Secretariat |
R5-96-e AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-223905 | Latest RAN Plenary notes | report | WG Chairman |
R5-96-e AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-223906 | Latest RAN Plenary draft Report | report | WG Chairman |
R5-96-e AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-223907 | Post Plenary Active Work Item update | other | ETSI Secretariat |
R5-96-e AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-223908 | RAN5 SR to RP#96-e | report | WG Chairman |
R5-96-e AI: 2.2 |
noted | [WTS] [JSN] | |||
R5-223909 | TF160 SR to RP#96-e | report | WG Chairman |
R5-96-e AI: 2.2 |
noted | [WTS] [JSN] | |||
R5-223910 | RAN5#96-e LS Template | other | WG Chairman |
R5-96-e AI: 4.3 |
noted | [WTS] [JSN] | |||
R5-223911 | Meeting schedule for 2022-23 | other | WG Chairman |
R5-96-e AI: 4.4 |
noted | [WTS] [JSN] | |||
R5-223912 | WI Progress and Target Completion Date Review | other | WG Chairman |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |||
R5-223913 | Review deadlines for next quarter | other | WG Chairman |
R5-96-e AI: 7.6 |
noted | [WTS] [JSN] | |||
R5-223914 | Reply LS on V2X PC5 link for unicast communication with null security algorithm |
LS in LS is reply to C1-223325/ R5-222035 source LS: C1-223972 LS To: TSG RAN WG5 |
TSG WG CT1 | Rel-17 |
R5-96-e AI: 3 |
noted | [WTS] [JSN] | ||
R5-223915 | Reply LS on configuration of p-MaxEUTRA and p-NR-FR1 |
LS in LS is reply to R1-2203038/R4-2206567 source LS: R1-2205465 LS To: TSG RAN WG5 |
TSG WG RAN1 | NR_newRAT-Core | Rel-15 |
R5-96-e AI: 3 |
noted | [WTS] [JSN] | |
R5-223916 | Reply LS on configuration of p-MaxEUTRA and p-NR-FR1 |
LS in LS is reply to R5-217995 source LS: R2-2206422 LS To: TSG RAN WG5 |
TSG WG RAN2 | NR_newRAT-Core | Rel-15 |
R5-96-e AI: 3 |
noted | [WTS] [JSN] | |
R5-223917 | LS to RAN5 on measurement of phase continuity requirements for DMRS bundling |
LS in source LS: R4-2210550 LS To: TSG WG RAN5 |
TSG WG RAN4 | NR_cov_enh | Rel-17 |
R5-96-e AI: 3 |
noted | [WTS] [JSN] | |
R5-223918 | LS on the feasibility of testing UE initiated SDT data transmission in RRC_INACTIVE |
LS in source LS: R4-2210621 LS To: TSG WG RAN5 |
TSG WG RAN4 | NR_SmallData_INACTIVE-Perf | Rel-17 |
R5-96-e AI: 4.5.3 |
noted | [WTS] [JSN] | |
R5-223919 | Reply LS on SCell dropping in FR2 RF UL-CA tests |
LS in LS is reply to R5-221617 source LS: R4-2210812 LS To: TSG WG RAN5 |
TSG WG RAN4 | NR_newRAT-Core | Rel-15 |
R5-96-e AI: 3 |
noted | [WTS] [JSN] | |
R5-223920 | Reply LS on FR2 UE relative power control tolerance requirements |
LS in LS is reply to R5-218231 source LS: R4-2210814 LS To: TSG WG RAN5 |
TSG WG RAN4 | NR_newRAT-Core | Rel-15 |
R5-96-e AI: 3 |
noted | [WTS] [JSN] | |
R5-223921 | Further Reply LS on configuration of p-MaxEUTRA and p-NR-FR1 |
LS in LS is reply to R5-217995 source LS: R4-2210815 LS To: TSG WG RAN5 |
TSG WG RAN4 | NR_newRAT-Core | Rel-15 |
R5-96-e AI: 3 |
noted | [WTS] [JSN] | |
R5-223922 | Reply LS on Additional RF requirements for NS_03U, NS_05U and NS_43U |
LS in LS is reply to R4-2207624 / R5-221613 source LS: R4-2211129 LS To: TSG WG RAN5 |
TSG WG RAN4 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-96-e AI: 3 |
noted | [WTS] [JSN] | |
R5-223923 | Reply LS on V2X PC5 link for unicast communication with null security algorithm |
LS in LS is reply to S3-221317/ R5-222035 source LS: S3-221590 LS To: TSG WG RAN5 |
TSG WG SA3 | eV2XARC | Rel-17 |
R5-96-e AI: 3 |
noted | [WTS] [JSN] | |
R5-223924 | draft meeting report RAN5#96-e | report | ETSI Secretariat |
R5-96-e AI: 7.7 |
noted | [WTS] [JSN] | |||
R5-223925 | Correction to UL Configuration for Band n14 REFSENS |
CR revised to R5-225718 |
AT&T | 38.521-1 17.5.0 CR#1756 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.3.2 |
revised | [WTS] [JSN] |
R5-223926 | Update to 2-step RACH RRM TC 7.3.2.2.4-FR2 non-contention based random access | CR | China Telecom | 38.533 17.3.1 CR#1838 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
agreed | [WTS] [JSN] |
R5-223927 | Correction to EN-DC FR2 RLM tests for PSCell configured with CSI-RS-based RLM RS in DRX including TT |
CR revised to R5-225617 |
Anritsu | 38.533 17.3.1 CR#1839 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
revised | [WTS] [JSN] |
R5-223928 | Add Test Tolerance analyses for EN-DC FR2 RLM tests for PSCell configured with CSI-RS-based RLM RS in DRX |
CR revised to R5-225618 |
Anritsu | 38.903 16.12.0 CR#321 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-223929 | MCC TF160 Status Report |
report revised to R5-225249 |
MCC TF160 |
R5-96-e AI: 2.1 |
revised | [WTS] [JSN] | |||
R5-223930 | RAN5 PRD12 version 6.9 | other | MCC TF160 |
R5-96-e AI: 4.3 |
approved | [WTS] [JSN] | |||
R5-223931 | Corrections to NR MAC TC 7.1.1.3.12 | CR | MCC TF160 | 38.523-1 16.12.0 CR#3004 catF | NR_L1enh_URLLC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.11.3 |
agreed | [WTS] [JSN] |
R5-223932 | NR URLLC enhancements: addition of PUSCH Repetition Type B support | CR | MCC TF160 | 38.523-3 17.3.0 CR#2669 catF | NR_L1enh_URLLC-UEConTest | Rel-17 |
R5-96-e AI: 6.3.11.5 |
agreed | [WTS] [JSN] |
R5-223933 | NR Positioning: updates for posSIBs support | CR | MCC TF160 | 38.523-3 17.3.0 CR#2670 catF | NR_pos-UEConTest | Rel-17 |
R5-96-e AI: 6.3.14.4 |
agreed | [WTS] [JSN] |
R5-223934 | NR IMS eCall: addition of NR/GERAN Inter-RAT support | CR | MCC TF160 | 38.523-3 17.3.0 CR#2671 catF | NR_EIEI-UEConTest | Rel-17 |
R5-96-e AI: 6.3.16.5 |
agreed | [WTS] [JSN] |
R5-223935 | Correction to NR MAC TC 7.1.1.1.3 | CR | MCC TF160 | 38.523-1 16.12.0 CR#3005 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-223936 | Updates for NR RRC test case 8.1.5.1.1 |
CR revised to R5-225384 |
MCC TF160, Huawei, HiSilicon | 38.523-1 16.12.0 CR#3006 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.5 |
revised | [WTS] [JSN] |
R5-223937 | Updates for EN-DC RRC test case 8.2.1.1.1 |
CR revised to R5-225391 |
MCC TF160 | 38.523-1 16.12.0 CR#3007 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.1 |
revised | [WTS] [JSN] |
R5-223938 | Updates for NE-DC RRC test case 8.2.1.1.2 |
CR revised to R5-225392 |
MCC TF160 | 38.523-1 16.12.0 CR#3008 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.1 |
revised | [WTS] [JSN] |
R5-223939 | Routine maintenance for TS 38.523-3 |
CR revised to R5-225418 |
MCC TF160 | 38.523-3 17.3.0 CR#2672 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.6 |
revised | [WTS] [JSN] |
R5-223940 | Corrections to NB-IoT RRC TC 22.4.14a | CR | MCC TF160 | 36.523-1 17.2.0 CR#5102 catF | TEI15_Test, NB_IOTenh2-UEConTest | Rel-17 |
R5-96-e AI: 6.5.3.11 |
agreed | [WTS] [JSN] |
R5-223941 | Routine maintenance for TS 36.523-3 |
CR revised to R5-225420 |
MCC TF160 | 36.523-3 17.3.0 CR#4679 catF | TEI16_Test | Rel-17 |
R5-96-e AI: 6.5.5 |
revised | [WTS] [JSN] |
R5-223942 | Correction of clause 5.3A - Generic test procedures for UE MCPTT operation | CR | MCC TF160 | 36.579-1 15.6.0 CR#263 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
agreed | [WTS] [JSN] |
R5-223943 | Correction of clause 5.3B - Generic test procedures for UE MCVideo operation | CR | MCC TF160 | 36.579-1 15.6.0 CR#264 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
agreed | [WTS] [JSN] |
R5-223944 | Correction of clause 5.5.11 - Default MCVideo Transmission Control Messages and other Information Elements | CR | MCC TF160 | 36.579-1 15.6.0 CR#265 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
agreed | [WTS] [JSN] |
R5-223945 | Correction of clause 5.5.2 - Default SIP message and other information elements | CR | MCC TF160 | 36.579-1 15.6.0 CR#266 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
agreed | [WTS] [JSN] |
R5-223946 | Correction of clause 5.5.3.1 - SDP Message | CR | MCC TF160 | 36.579-1 15.6.0 CR#267 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
agreed | [WTS] [JSN] |
R5-223947 | Correction of clause 5.5.6 - Default MCPTT media plane control messages and other information elements | CR | MCC TF160 | 36.579-1 15.6.0 CR#268 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
agreed | [WTS] [JSN] |
R5-223948 | Correction of clause 5.5.8 - Default MCS configuration management messages and other information elements | CR | MCC TF160 | 36.579-1 15.6.0 CR#269 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
agreed | [WTS] [JSN] |
R5-223949 | Correction of clause 5.5.9 - Default miscellaneous messages and other information elements | CR | MCC TF160 | 36.579-1 15.6.0 CR#270 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
agreed | [WTS] [JSN] |
R5-223950 | Correction of test case 5.4 | CR | MCC TF160 | 36.579-2 15.4.0 CR#302 catF | TEI14_Test, MCPTT-ConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223951 | Correction of test case 5.7 | CR | MCC TF160 | 36.579-2 15.4.0 CR#303 catF | TEI15_Test, MCenhUEConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223952 | Correction of test case 6.3.2 | CR | MCC TF160 | 36.579-2 15.4.0 CR#304 catF | TEI14_Test, MCPTT-ConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223953 | Correction of test case 6.4.1 | CR | MCC TF160 | 36.579-2 15.4.0 CR#305 catF | TEI14_Test, MCPTT-ConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223954 | Correction of test cases in clause 6.1.1 - Pre-Arranged Group Call | CR | MCC TF160 | 36.579-2 15.4.0 CR#306 catF | TEI14_Test, MCPTT-ConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223955 | Correction of test cases in clause 6.1.2 - Chat Group Calls | CR | MCC TF160 | 36.579-2 15.4.0 CR#307 catF | TEI14_Test, MCPTT-ConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223956 | Correction of test cases in clause 6.1.3 - Conference Event Package | CR | MCC TF160 | 36.579-2 15.4.0 CR#308 catF | TEI15_Test, MCenhUEConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223957 | Correction of test cases in clause 6.1.4 - Remote Change of Selected Group | CR | MCC TF160 | 36.579-2 15.4.0 CR#309 catF | TEI15_Test, MCenhUEConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223958 | Correction of test cases in clause 6.1.5 - Remotely initiated group call | CR | MCC TF160 | 36.579-2 15.4.0 CR#310 catF | TEI15_Test, MCenhUEConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223959 | Correction of test cases in clause 6.2 - Private Calls | CR | MCC TF160 | 36.579-2 15.4.0 CR#311 catF | TEI14_Test, MCPTT-ConTest | Rel-15 |
R5-96-e AI: 6.6.9.2 |
agreed | [WTS] [JSN] |
R5-223960 | Routine maintenance for TS 36.579-5 | CR | MCC TF160 | 36.579-5 14.7.0 CR#76 catF | TEI14_Test, MCImp-UEConTest | Rel-14 |
R5-96-e AI: 6.6.9.5 |
agreed | [WTS] [JSN] |
R5-223961 | Correction of test cases in clause 6.1.1 - Pre-Arranged Group Call | CR | MCC TF160 | 36.579-6 15.3.0 CR#69 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.6 |
agreed | [WTS] [JSN] |
R5-223962 | Correction of test cases in clause 6.1.4 - Remote change of selected group | CR | MCC TF160 | 36.579-6 15.3.0 CR#70 catF | TEI15_Test, MCenhUEConTest | Rel-15 |
R5-96-e AI: 6.6.9.6 |
agreed | [WTS] [JSN] |
R5-223963 | Correction to Annex F for 2-step RACH TC 7.3.2.2.4 | CR | China Telecom | 38.533 17.3.1 CR#1840 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
withdrawn | [WTS] [JSN] |
R5-223964 | TT analysis for 5.7.1.3 and 7.7.1.3 | CR | ROHDE & SCHWARZ | 38.903 16.12.0 CR#322 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-223965 | Complete 5.7.1.3 including TT analysis results | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1841 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-223966 | Complete 7.7.1.3 including TT analysis results | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1842 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
agreed | [WTS] [JSN] |
R5-223967 | Annex F for 5.7.1.3 and 7.7.1.3 |
CR revised to R5-225635 |
ROHDE & SCHWARZ | 38.533 17.3.1 CR#1843 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
revised | [WTS] [JSN] |
R5-223968 | Applicability for 5.7.1.3 and 7.7.1.3 | CR | ROHDE & SCHWARZ | 38.522 17.5.0 CR#190 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.8 |
agreed | [WTS] [JSN] |
R5-223969 | TT analysis for TS 37.571-1 TC 14.2.1 |
CR revised to R5-225879 |
ROHDE & SCHWARZ | 38.903 16.12.0 CR#323 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.6 |
revised | [WTS] [JSN] |
R5-223970 | Complete TC 14.2.1 including TT analysis results |
CR revised to R5-225877 |
ROHDE & SCHWARZ | 37.571-1 16.13.0 CR#377 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
revised | [WTS] [JSN] |
R5-223971 | Complete TC 14.3.1 including TT analysis results |
CR revised to R5-225878 |
ROHDE & SCHWARZ | 37.571-1 16.13.0 CR#378 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
revised | [WTS] [JSN] |
R5-223972 | Annexes for TC 14.2.1 and 14.3.1 | CR | ROHDE & SCHWARZ | 37.571-1 16.13.0 CR#379 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-223973 | Applicability for TC 14.2.1 and 14.3.1 | CR | ROHDE & SCHWARZ | 37.571-3 16.12.0 CR#154 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.4 |
withdrawn | [WTS] [JSN] |
R5-223974 | Assistance data for TC 14.2.1 and 14.3.1 |
CR revised to R5-225742 |
ROHDE & SCHWARZ | 37.571-5 16.8.0 CR#216 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.5 |
revised | [WTS] [JSN] |
R5-223975 | TT analysis for 4.3.2.2.3 | CR | ROHDE & SCHWARZ | 38.903 16.12.0 CR#324 catF | NR_2step_RACH-UEConTest | Rel-16 |
R5-96-e AI: 5.3.17.5 |
agreed | [WTS] [JSN] |
R5-223976 | TT analysis for TS 37.571-1 TC 14.3.1 |
CR revised to R5-225880 |
ROHDE & SCHWARZ | 38.903 16.12.0 CR#325 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.6 |
revised | [WTS] [JSN] |
R5-223977 | Complete TC 4.3.2.2.3 ncluding TT analysis results | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1844 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
agreed | [WTS] [JSN] |
R5-223978 | Complete TC 4.3.2.2.4 ncluding TT analysis results | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1845 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
agreed | [WTS] [JSN] |
R5-223979 | Complete TC 6.3.2.2.3 ncluding TT analysis results |
CR revised to R5-225628 |
ROHDE & SCHWARZ, China Telecom | 38.533 17.3.1 CR#1846 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
revised | [WTS] [JSN] |
R5-223980 | Complete TC 6.3.2.2.4 ncluding TT analysis results |
CR revised to R5-225629 |
ROHDE & SCHWARZ, China Telecom | 38.533 17.3.1 CR#1847 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
revised | [WTS] [JSN] |
R5-223981 | Annexes for 2-step RACH test cases | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1848 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
agreed | [WTS] [JSN] |
R5-223982 | Applicability for 2-step RACH test cases |
CR revised to R5-225747 |
ROHDE & SCHWARZ | 38.522 17.5.0 CR#191 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.3 |
revised | [WTS] [JSN] |
R5-223983 | TT analysis for positioning test case 15.2.1 and 15.2.2 |
CR revised to R5-225616 |
CATT | 38.903 16.12.0 CR#326 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.6 |
revised | [WTS] [JSN] |
R5-223984 | Update of EN-DC FR1 TC 4.5.7.1 |
CR revised to R5-225883 |
MediaTek Inc. | 38.533 17.3.1 CR#1849 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
revised | [WTS] [JSN] |
R5-223985 | Update of SA FR2 TC 7.5.7.1 | CR | MediaTek Inc. | 38.533 17.3.1 CR#1850 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
withdrawn | [WTS] [JSN] |
R5-223986 | Update of NR5GC CAG TC 6.5.2.4 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3009 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-223987 | Correction to test procedure 4.9.11 IMS Emergency call or eCall over IMS establishment in 5GC with IMS emergency registration | CR | MediaTek Inc., Anritsu, Rohde & Schwarz | 38.508-1 17.5.0 CR#2416 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
agreed | [WTS] [JSN] |
R5-223988 | Update of A.4.3.2B.2.0 for EN-DC capabilities | CR | MediaTek Inc. | 38.508-2 17.5.0 CR#351 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.2 |
agreed | [WTS] [JSN] |
R5-223989 | Addition of MDT PICS for location reporting of inter-RAT measurement |
CR revised to R5-225368 |
MediaTek Inc. | 38.508-2 17.5.0 CR#352 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-17 |
R5-96-e AI: 6.4.2 |
revised | [WTS] [JSN] |
R5-223990 | Update of SRVCC TC 8.1.3.2.6 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3010 catF | TEI16_Test, SRVCC_NR_to_UMTS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.3 |
agreed | [WTS] [JSN] |
R5-223991 | Update of SRVCC TC 8.1.3.2.7 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3011 catF | TEI16_Test, SRVCC_NR_to_UMTS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.3 |
agreed | [WTS] [JSN] |
R5-223992 | Update of SRVCC TC 8.1.3.2.8 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3012 catF | TEI16_Test, SRVCC_NR_to_UMTS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.3 |
agreed | [WTS] [JSN] |
R5-223993 | Update of NR MDT TC 8.1.6.1.2.7 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3013 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-223994 | Update of NR MDT TC 8.1.6.1.4.3 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3014 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-223995 | Update of NR MDT TC 8.1.6.1.4.4 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3015 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-223996 | Update of NR MDT TC 8.1.6.2.3 |
CR revised to R5-225386 |
MediaTek Inc., Anritsu | 38.523-1 16.12.0 CR#3016 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
revised | [WTS] [JSN] |
R5-223997 | Editorial update of UAC TC 11.3.2 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3017 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
agreed | [WTS] [JSN] |
R5-223998 | Addition of Release other RAT for Inter-RAT MDT test cases | CR | MediaTek Inc., Anritsu | 38.523-2 16.12.0 CR#230 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-223999 | Update of applicability of NR MDT TC 8.1.6.2.1 | CR | MediaTek Inc. | 38.523-2 16.12.0 CR#231 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
R5-224000 | Update of applicability for EN-DC UL CA cases 8.2.6.1.1.x | CR | MediaTek Inc. | 38.523-2 16.12.0 CR#232 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-224001 | Update of applicability for CA test case 7.1.1.3.8.x |
CR revised to R5-225413 |
MediaTek Inc. | 38.523-2 16.12.0 CR#233 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
revised | [WTS] [JSN] |
R5-224002 | Update of applicability for CA test case 8.1.5.7.1.2 | CR | MediaTek Inc. | 38.523-2 16.12.0 CR#234 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-224003 | Update of CHO TC 8.2.4.31.4 | CR | MediaTek Inc. | 36.523-1 17.2.0 CR#5103 catF | TEI16_Test, LTE_feMob-UEConTest | Rel-17 |
R5-96-e AI: 6.5.3.3.2 |
agreed | [WTS] [JSN] |
R5-224004 | Update of applicability for 5GC test case 7.14 and 7.20 |
CR revised to R5-225422 |
MediaTek Inc., SGS Wirelessc | 34.229-2 16.3.0 CR#313 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.2 |
revised | [WTS] [JSN] |
R5-224005 | Correction to UE Rx-TX time difference measurement period test cases 15.2.1 and 15.2.2 |
CR revised to R5-225698 |
CATT | 37.571-1 16.13.0 CR#380 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
revised | [WTS] [JSN] |
R5-224006 | Update of SA FR1 TC 6.3.2.1.1 and 6.3.2.1.2 | CR | MediaTek Inc. | 38.533 17.3.1 CR#1851 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
agreed | [WTS] [JSN] |
R5-224007 | Update of NR MDT TC 8.1.6.3.1.3 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3018 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-224008 | GCF 3GPP TCL after GCF CAG#71 | other | Ericsson |
R5-96-e AI: 2.2 |
noted | [WTS] [JSN] | |||
R5-224009 | 3GPP RAN5 PRD19 v1.4.0: Generic work plan template |
other revised to R5-225272 |
Ericsson |
R5-96-e AI: 4.3 |
revised | [WTS] [JSN] | |||
R5-224010 | 3GPP RAN5 PRD20 v1.2.0: CA status list | other | Ericsson |
R5-96-e AI: 7.3.3 |
postponed | [WTS] [JSN] | |||
R5-224011 | RAN5#96 summary of changes to RAN5 test cases with potential impact on GCF and PTCRB | report | Ericsson |
R5-96-e AI: 7.5 |
reserved | [WTS] [JSN] | |||
R5-224012 | WP Rel-15 5GS maintenance | Work Plan | Ericsson | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-15 |
R5-96-e AI: 7.4.3 |
reserved | [WTS] [JSN] | |
R5-224013 | WP UE Conformance Test Aspects - Rel-15 LTE CA configurations | Work Plan | Ericsson | LTE_CA_R15-UEConTest | Rel-15 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224014 | SR UE Conformance Test Aspects - Rel-15 LTE CA configurations | WI status report | Ericsson | LTE_CA_R15-UEConTest | Rel-15 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224015 | WP UE Conformance Test Aspects - Rel-16 LTE CA configurations | Work Plan | Ericsson | LTE_CA_R16-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224016 | SR UE Conformance Test Aspects - Rel-16 LTE CA configurations | WI status report | Ericsson | LTE_CA_R16-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224017 | WP UE Conformance Test Aspects - New Rel-16 NR bands and extension of existing NR bands | Work Plan | Ericsson | NR_bands_BW_R16-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224018 | SR UE Conformance Test Aspects - New Rel-16 NR bands and extension of existing NR bands | WI status report | Ericsson | NR_bands_BW_R16-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224019 | WP UE Conformance - Power Class 2 for EN-DC with xLTE band + yNR DL with 1LTE+1(TDD) NR UL band (x= 2, 3, 4, y=1; x=1, 2, y=2) | Work Plan | Ericsson | ENDC_PC2_R17_xLTE_yNR-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224020 | SR UE Conformance - Power Class 2 for EN-DC with xLTE band + yNR DL with 1LTE+1(TDD) NR UL band (x= 2, 3, 4, y=1; x=1, 2, y=2) | WI status report | Ericsson | ENDC_PC2_R17_xLTE_yNR-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224021 | PRD21 CDS: PC3 for n41 and CBW extension for 70 MHz | other | Ericsson | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.3.4 |
available | [WTS] [JSN] | |
R5-224022 | PRD21 CDS: PC3 for n48 and CBW extensions for 30 and 70 MHz | other | Ericsson | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.3.4 |
available | [WTS] [JSN] | |
R5-224023 | Guideline for handling PRD21 CDS documents at RAN5#96-e | other | Ericsson |
R5-96-e AI: 4.3 |
noted | [WTS] [JSN] | |||
R5-224024 | UE Conformance Test Aspects for NR Positioning Enhancements |
WID new revised to R5-225250 |
CATT, CAICT |
R5-96-e AI: 4.1 |
revised | [WTS] [JSN] | |||
R5-224025 | Revised WID on UE Conformance - NR Sidelink Relay | WID revised | CATT | NR_SL_relay-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
R5-224026 | WP - WI UE Conformance - Multi-SIM devices for LTE/NR | Work Plan | China Telecom | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224027 | SR - WI UE Conformance - Multi-SIM devices for LTE/NR | WI status report | China Telecom | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224028 | Update to 2-step RACH RRM TC 6.3.2.2.3 and TC 6.3.2.2.4 | CR | China Telecom | 38.533 17.3.1 CR#1852 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
withdrawn | [WTS] [JSN] |
R5-224029 | Update to 5GC test case 9.1.6.1.3 | CR | CATT, TDIA | 38.523-1 16.12.0 CR#3019 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.3 |
agreed | [WTS] [JSN] |
R5-224030 | Editorial Update to UAC test case titles in 38.523-1 | CR | CATT, TDIA | 38.523-1 16.12.0 CR#3020 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
withdrawn | [WTS] [JSN] |
R5-224031 | Editorial update to UAC test case titles in 38.523-1 | CR | CATT, TDIA | 38.523-1 16.12.0 CR#3021 catF | 5GS_NR_LTE-UEConTest, TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
agreed | [WTS] [JSN] |
R5-224032 | Editorial update to 5GC and UAC test case titles in 38.523-2 | CR | CATT, TDIA | 38.523-2 16.12.0 CR#235 catF | 5GS_NR_LTE-UEConTest, TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-224033 | Introduction of test frequencies for NR-U band n46 | CR | Ericsson | 38.508-1 17.5.0 CR#2417 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.1.1 |
agreed | [WTS] [JSN] |
R5-224034 | Introduction of test frequencies for NR-U band n96 | CR | Ericsson | 38.508-1 17.5.0 CR#2418 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.1.1 |
agreed | [WTS] [JSN] |
R5-224035 | Correction of 6.6.2.2 Additional Spectrum Emission Mask Test configuration Table |
CR revised to R5-225834 |
MediaTek Inc. | 36.521-1 17.3.0 CR#5409 catF | TEI8_Test | Rel-17 |
R5-96-e AI: 5.5.1.3.1 |
revised | [WTS] [JSN] |
R5-224036 | Update of 5G-NR test cases applicability |
CR revised to R5-225414 |
Qualcomm France, MCC TF160 | 38.523-2 16.12.0 CR#236 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
revised | [WTS] [JSN] |
R5-224037 | WP UE Conformance Test Aspects - Support of eCall over IMS for NR | Work Plan | Qualcomm France | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224038 | SR UE Conformance Test Aspects - Support of eCall over IMS for NR | WI status report | Qualcomm France | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224039 | Correction to Condition C16 for TCs specified in 34.229-5 | CR | SGS Wireless | 34.229-2 16.3.0 CR#314 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.2 |
withdrawn | [WTS] [JSN] |
R5-224040 | Correction to Condition C175 for TC7.1.1.3.2b in 38.523-1 | CR | SGS Wireless | 38.523-2 16.12.0 CR#237 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
R5-224041 | Update IE SIB3 | CR | Ericsson | 38.508-1 17.5.0 CR#2419 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-224042 | Update IE SIB4 | CR | Ericsson | 38.508-1 17.5.0 CR#2420 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-224043 | Update IE SIB5 | CR | Ericsson | 38.508-1 17.5.0 CR#2421 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-224044 | Update IE MeasObjectEUTRA | CR | Ericsson | 38.508-1 17.5.0 CR#2422 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-224045 | Update IE MeasObjectNR | CR | Ericsson | 38.508-1 17.5.0 CR#2423 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-224046 | Discussion on Rel-16 Power Boost test definition | discussion | Keysight technologies UK Ltd, Apple Portugal | NR_RF_FR2_req_enh-UEConTest |
R5-96-e AI: 5.3.15.8 |
noted | [WTS] [JSN] | ||
R5-224047 | New NR-DC RRC Radio Bearer test case 8.2.2.2.2 |
CR revised to R5-225393 |
ZTE Corporation, Tejet, SRTC, Huawei, Hisilicon | 38.523-1 16.12.0 CR#3022 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
revised | [WTS] [JSN] |
R5-224048 | New NE-DC RRC Radio Bearer test case 8.2.2.2.3 | CR | ZTE Corporation, Tejet, SRTC | 38.523-1 16.12.0 CR#3023 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-224049 | New NE-DC RRC Radio Bearer test case 8.2.2.7.3 |
CR revised to R5-225394 |
ZTE Corporation, Tejet, SRTC | 38.523-1 16.12.0 CR#3024 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
revised | [WTS] [JSN] |
R5-224050 | New NE-DC RRC Radio Bearer test case 8.2.2.8.3 | CR | ZTE Corporation, Tejet, SRTC | 38.523-1 16.12.0 CR#3025 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-224051 | New NE-DC RRC Radio Bearer test case 8.2.2.9.3 | CR | ZTE Corporation, Tejet, SRTC | 38.523-1 16.12.0 CR#3026 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-224052 | New NE-DC measurements test case 8.2.3.1.2 |
CR revised to R5-225395 |
ZTE Corporation | 38.523-1 16.12.0 CR#3027 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224053 | New NE-DC measurements test case 8.2.3.1.2 | CR | ZTE Corporation | 38.523-1 16.12.0 CR#3028 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
withdrawn | [WTS] [JSN] |
R5-224054 | New NE-DC measurements test case 8.2.3.1.2 | CR | ZTE Corporation | 38.523-1 16.12.0 CR#3029 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
withdrawn | [WTS] [JSN] |
R5-224055 | New NE-DC measurements test case 8.2.3.2.2 |
CR revised to R5-225396 |
ZTE Corporation | 38.523-1 16.12.0 CR#3030 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224056 | New NE-DC measurements test case 8.2.3.7.2 |
CR revised to R5-225397 |
ZTE Corporation | 38.523-1 16.12.0 CR#3031 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224057 | New NE-DC measurements test case 8.2.3.7.2a |
CR revised to R5-225398 |
ZTE Corporation | 38.523-1 16.12.0 CR#3032 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224058 | New NE-DC measurements test case 8.2.3.7.2b |
CR revised to R5-225399 |
ZTE Corporation | 38.523-1 16.12.0 CR#3033 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224059 | New NE-DC measurements test case 8.2.3.8.2 |
CR revised to R5-225400 |
ZTE Corporation | 38.523-1 16.12.0 CR#3034 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224060 | New NE-DC measurements test case 8.2.3.8.2a |
CR revised to R5-225401 |
ZTE Corporation | 38.523-1 16.12.0 CR#3035 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224061 | New NE-DC measurements test case 8.2.3.8.2b |
CR revised to R5-225402 |
ZTE Corporation | 38.523-1 16.12.0 CR#3036 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224062 | New NE-DC measurements test case 8.2.3.1.2 | CR | ZTE Corporation | 38.523-1 16.12.0 CR#3037 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
withdrawn | [WTS] [JSN] |
R5-224063 | Update of 4.9.12A Test procedure for IMS MO Emergency call release | CR | ZTE Corporation | 38.508-1 17.5.0 CR#2424 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] |
R5-224064 | WP NR_2step_RACH-UEConTest | Work Plan | ZTE Corporation, China Telecom | NR_2step_RACH-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224065 | SR NR_2step_RACH-UEConTest | WI status report | ZTE Corporation, China Telecom | NR_2step_RACH-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224066 | Update 2-step RACH test case 7.1.1.1.7 |
CR revised to R5-225317 |
ZTE Corporation | 38.523-1 16.12.0 CR#3038 catF | NR_2step_RACH-UEConTest | Rel-16 |
R5-96-e AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-224067 | Update 2-step RACH test case 7.1.1.1.8 |
CR revised to R5-225318 |
ZTE Corporation | 38.523-1 16.12.0 CR#3039 catF | NR_2step_RACH-UEConTest | Rel-16 |
R5-96-e AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-224068 | Update 2-step RACH test case 7.1.1.1.10 |
CR revised to R5-225319 |
ZTE Corporation | 38.523-1 16.12.0 CR#3040 catF | NR_2step_RACH-UEConTest | Rel-16 |
R5-96-e AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-224069 | Update default message contents of RACH-ConfigDedicated |
CR revised to R5-225316 |
ZTE Corporation | 38.508-1 17.5.0 CR#2425 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.15.1 |
revised | [WTS] [JSN] |
R5-224070 | Discussion on Rel-16 Power Boost measurement uncertainties and test tolerances |
discussion revised to R5-225647 |
Keysight technologies UK Ltd | NR_RF_FR2_req_enh-UEConTest |
R5-96-e AI: 5.3.15.8 |
revised | [WTS] [JSN] | ||
R5-224071 | New test case addition: 6.2.4_1 Configured transmitted power with Power Boost |
CR revised to R5-225658 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#762 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.1 |
revised | [WTS] [JSN] |
R5-224072 | In-band emissions minimum conformance requirements update |
CR revised to R5-225743 |
Keysight technologies UK Ltd, Apple Portugal | 38.521-2 16.12.0 CR#763 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.1 |
revised | [WTS] [JSN] |
R5-224073 | Test point analysis for test 6.2.4_1 Configured transmitted power with Power Boost |
CR revised to R5-225745 |
Keysight technologies UK Ltd | 38.905 17.5.0 CR#629 catF | NR_RF_FR2_req_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.15.7 |
revised | [WTS] [JSN] |
R5-224074 | New test case addition: 6.2B.4.1.4_1 Configured Output Power with Power Boost for Inter-Band EN-DC including FR2 (1 NR CC). |
CR revised to R5-225661 |
Keysight technologies UK Ltd | 38.521-3 17.5.0 CR#1394 catF | NR_RF_FR2_req_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.15.4.1 |
revised | [WTS] [JSN] |
R5-224075 | Measurement uncertainties for test case 6.2.4_1 Configured transmitted power with Power Boost |
CR revised to R5-225663 |
Keysight technologies UK Ltd | 38.903 16.12.0 CR#327 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.6 |
revised | [WTS] [JSN] |
R5-224076 | Measurement uncertainties and test tolerances for test case 6.2.4_1 Configured transmitted power with Power Boost |
CR revised to R5-225660 |
Keysight technologies UK Ltd, Apple Hungary Kft. | 38.521-2 16.12.0 CR#764 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.3 |
revised | [WTS] [JSN] |
R5-224077 | Measurement uncertainties and test tolerances for test case 6.2B.4.1.4_1 Configured Output Power with Power Boost for Inter-Band EN-DC including FR2 (1 NR CC) |
CR revised to R5-225662 |
Keysight technologies UK Ltd, Apple Hungary Kft. | 38.521-3 17.5.0 CR#1395 catF | NR_RF_FR2_req_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.15.4.3 |
revised | [WTS] [JSN] |
R5-224078 | Discussion on message type for Power limit test functions |
discussion revised to R5-225608 |
Keysight technologies UK Ltd, Apple Portugal | TEI16_Test |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-224079 | Rel-16 Pcell power limit test function proposal including unequal bandwidth case | CR | Keysight technologies UK Ltd, Apple Portugal | 38.509 16.4.0 CR#62 catB | TEI16_Test | Rel-16 |
R5-96-e AI: 5.4.3 |
withdrawn | [WTS] [JSN] |
R5-224080 | Rel-16 Addition of new test function to limit Pcell power: Option 1 |
CR revised to R5-225603 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 16.4.0 CR#63 catB | TEI16_Test | Rel-16 |
R5-96-e AI: 5.4.3 |
revised | [WTS] [JSN] |
R5-224081 | Rel-17 Addition of new test function to limit Pcell power: Option 1 |
CR revised to R5-225604 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 17.0.0 CR#64 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.4.3 |
revised | [WTS] [JSN] |
R5-224082 | Rel-16 Correction of SET UL MESSAGES |
CR revised to R5-225605 |
Keysight technologies UK Ltd, Apple Portugal | 36.509 16.2.0 CR#211 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 5.5.1.2 |
revised | [WTS] [JSN] |
R5-224083 | Rel-17 Correction of SET UL MESSAGES |
CR revised to R5-225606 |
Keysight technologies UK Ltd, Apple Portugal | 36.509 17.0.0 CR#212 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.5.1.2 |
revised | [WTS] [JSN] |
R5-224084 | Rel-16 Extension of test control command message type values reserved for 5GS |
CR revised to R5-225610 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 16.4.0 CR#65 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 5.4.3 |
revised | [WTS] [JSN] |
R5-224085 | Rel-17 Extension of test control command message type values reserved for 5GS |
CR revised to R5-225611 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 17.0.0 CR#66 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.4.3 |
revised | [WTS] [JSN] |
R5-224086 | Rel-16 Extension of test control command message type values reserved for E-UTRA and NB-IoT |
CR revised to R5-225614 |
Keysight technologies UK Ltd, Apple Portugal | 36.509 16.2.0 CR#213 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 5.5.1.2 |
revised | [WTS] [JSN] |
R5-224087 | Rel-17 Extension of test control command message type values reserved for E-UTRA and NB-IoT |
CR revised to R5-225615 |
Keysight technologies UK Ltd, Apple Portugal | 36.509 17.0.0 CR#214 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.5.1.2 |
revised | [WTS] [JSN] |
R5-224088 | Rel-16 Addition of new test function to limit Pcell power: Option 2 |
CR revised to R5-225841 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 16.4.0 CR#67 catB | TEI16_Test | Rel-16 |
R5-96-e AI: 5.4.3 |
revised | [WTS] [JSN] |
R5-224089 | Rel-17 Addition of new test function to limit Pcell power: Option 2 |
CR revised to R5-225842 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 17.0.0 CR#68 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.4.3 |
revised | [WTS] [JSN] |
R5-224090 | Rel-17 Pcell power limit test function proposal including unequal bandwidth case | CR | Keysight technologies UK Ltd, Apple Portugal | 38.509 17.0.0 CR#69 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.4.3 |
withdrawn | [WTS] [JSN] |
R5-224091 | Update of test function to limit Pcell power to include unequal bandwidth case | CR | Keysight technologies UK Ltd, Apple Portugal | 38.508-1 17.5.0 CR#2426 catF | TEI16_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
withdrawn | [WTS] [JSN] |
R5-224092 | Updates on UE Power Limit Messages: Option 1 |
CR revised to R5-225267 |
Keysight technologies UK Ltd, Apple Portugal | 38.508-1 17.5.0 CR#2427 catF | TEI16_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
revised | [WTS] [JSN] |
R5-224093 | Updates on UE Power Limit Messages: Option 2 |
CR revised to R5-225366 |
Keysight technologies UK Ltd, Apple Portugal | 38.508-1 17.5.0 CR#2428 catF | TEI16_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
revised | [WTS] [JSN] |
R5-224094 | Update of MDT default RRC messages and IEs | CR | MediaTek Inc., MCC TF160 | 38.508-1 17.5.0 CR#2429 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224095 | Update of Inter-RAT MDT test cases 8.1.6.2.x |
CR revised to R5-225387 |
MediaTek Inc., MCC TF160 | 38.523-1 16.12.0 CR#3041 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
revised | [WTS] [JSN] |
R5-224096 | Update of Inter-System MDT test cases 8.1.6.3.x |
CR revised to R5-225388 |
MediaTek Inc., MCC TF160 | 38.523-1 16.12.0 CR#3042 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
revised | [WTS] [JSN] |
R5-224097 | Applicability of new NR-DC and NE-DC test cases | CR | ZTE Corporation. | 38.523-2 16.12.0 CR#238 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-224098 | New WID on UE Conformance – Access Traffic Steering, Switch and Splitting support for NR |
WID new revised to R5-225251 |
China Telecom,CATT,ZTE | Rel-16 |
R5-96-e AI: 4.1 |
revised | [WTS] [JSN] | ||
R5-224099 | Update of LTE Multi-SIM default NAS messages and IEs |
CR revised to R5-225324 |
China Telecom | 36.508 17.2.0 CR#1391 catF | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 6.3.20.6 |
revised | [WTS] [JSN] |
R5-224100 | Update of NR Multi-SIM default NAS messages and IEs |
CR revised to R5-225276 |
China Telecom | 38.508-1 17.5.0 CR#2430 catF | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 6.3.20.1 |
revised | [WTS] [JSN] |
R5-224101 | Update of NR Multi-SIM default RRC messages and IEs | CR | China Telecom | 38.508-1 17.5.0 CR#2431 catF | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 6.3.20.1 |
withdrawn | [WTS] [JSN] |
R5-224102 | Addition of test tolerance analysis for 4.7.7.1.1 and 6.7.9.1.1 EN-DC FR1 L1-SINR absolute accuracy tests |
CR revised to R5-225694 |
Sporton | 38.903 16.12.0 CR#328 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224103 | Addition of test tolerance analysis for 4.7.7.1.2 and 6.7.9.1.2 FR1 L1-SINR relative measurement accuracy |
CR revised to R5-225625 |
Sporton | 38.903 16.12.0 CR#329 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224104 | Addition of test tolerance analysis for 4.7.7.2 and 6.7.9.2 FR1 L1-SINR absolute measurement accuracy |
CR revised to R5-225695 |
Sporton | 38.903 16.12.0 CR#330 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224105 | Addition of test tolerance analysis for 4.7.7.3.1 and 6.7.9.3.1 FR1 L1-SINR absolute measurement accuracy |
CR revised to R5-225696 |
Sporton | 38.903 16.12.0 CR#331 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224106 | Addition of test tolerance analysis for 4.7.7.3.2 and 6.7.9.3.2 EN-DC FR1 L1-SINR absolute measurement accuracy |
CR revised to R5-225697 |
Sporton | 38.903 16.12.0 CR#332 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224107 | Addition of test tolerance analysis for 7.7.6.2 NR FR2 L1-SINR measurement accuracy test |
CR revised to R5-225626 |
Sporton | 38.903 16.12.0 CR#333 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224108 | Addition of test tolerance analysis for 7.7.6.3 NR FR2 L1-SINR measurement accuracy test |
CR revised to R5-225627 |
Sporton | 38.903 16.12.0 CR#334 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224109 | Discussion on measurement uncertainties for enhanced beam correspondence | discussion | Keysight technologies UK Ltd | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.8 |
noted | [WTS] [JSN] | |
R5-224110 | Enhanced Beam correspondence Measurement Uncertainties and test tolerances |
CR revised to R5-225659 |
Keysight technologies UK Ltd, Apple Portugal | 38.521-2 16.12.0 CR#765 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.1 |
revised | [WTS] [JSN] |
R5-224111 | Rel-15 Beam correspondence test tolerance definition |
CR revised to R5-225669 |
Keysight technologies UK Ltd | 38.521-3 17.5.0 CR#1396 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.3 |
revised | [WTS] [JSN] |
R5-224112 | Discussion on TPMI Test method applicability | discussion | Keysight technologies UK Ltd | FS_FR2_enhTestMethods |
R5-96-e AI: 5.3.50.1 |
noted | [WTS] [JSN] | ||
R5-224113 | Discussion on TPMI Test method implementation | discussion | Keysight technologies UK Ltd | FS_FR2_enhTestMethods |
R5-96-e AI: 5.3.50.1 |
noted | [WTS] [JSN] | ||
R5-224114 | Discussion on TPMI Test method measurement uncertainty | discussion | Keysight technologies UK Ltd | FS_FR2_enhTestMethods |
R5-96-e AI: 5.3.50.1 |
noted | [WTS] [JSN] | ||
R5-224115 | Discussion on Test time reduction techniques applicability | discussion | Keysight technologies UK Ltd | FS_FR2_enhTestMethods |
R5-96-e AI: 5.3.50.1 |
noted | [WTS] [JSN] | ||
R5-224116 | Discussion on Fast Spherical Coverage Test methods measurement uncertainty | discussion | Keysight technologies UK Ltd | FS_FR2_enhTestMethods |
R5-96-e AI: 5.3.50.1 |
noted | [WTS] [JSN] | ||
R5-224117 | Discussion on RSRP-B Rx Beam Peak Search Test method measurement uncertainty | discussion | Keysight technologies UK Ltd | FS_FR2_enhTestMethods |
R5-96-e AI: 5.3.50.1 |
withdrawn | [WTS] [JSN] | ||
R5-224118 | RF Updates implementing TPMI test method for coherent Ues |
CR revised to R5-225656 |
Keysight technologies UK Ltd | 38.508-1 17.5.0 CR#2432 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.2 |
revised | [WTS] [JSN] |
R5-224119 | Updates related to TPMI test methods |
CR revised to R5-225680 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#766 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
revised | [WTS] [JSN] |
R5-224120 | Updates to Spherical Coverage annexes |
CR revised to R5-225666 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#767 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
revised | [WTS] [JSN] |
R5-224121 | Tx Fast Spherical Coverage test cases integration |
CR revised to R5-225792 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#768 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-224122 | Rx Fast Spherical Coverage test cases integration |
CR revised to R5-225796 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#769 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.2 |
revised | [WTS] [JSN] |
R5-224123 | Annex updates related to RSRP-B Rx Beam peak search |
CR revised to R5-225798 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#770 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
revised | [WTS] [JSN] |
R5-224124 | FR2 Tx Signal Quality UL MIMO Test Case Updates |
CR revised to R5-225793 |
Qualcomm CDMA Technologies | 38.521-2 16.12.0 CR#771 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-224125 | Correction to NR5GC CAG test case 6.5.2.1 | CR | Keysight Technologies UK | 38.523-1 16.12.0 CR#3043 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
withdrawn | [WTS] [JSN] |
R5-224126 | Correction to NR5GC CAG test case 6.5.2.4 | CR | Keysight Technologies UK | 38.523-1 16.12.0 CR#3044 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
withdrawn | [WTS] [JSN] |
R5-224127 | Correction to NR MAC test case 7.1.1.1.1 | CR | Keysight Technologies UK | 38.523-1 16.12.0 CR#3045 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-224128 | Editorial correction to NR MAC test case 7.1.1.1.1a | CR | Keysight Technologies UK | 38.523-1 16.12.0 CR#3046 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-224129 | Correction to NR MAC test case 7.1.1.3.9 | CR | Keysight Technologies UK | 38.523-1 16.12.0 CR#3047 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-224130 | Correction to NR RRC test cases 8.1.4.1.5 and 8.1.4.1.6 | CR | Keysight Technologies UK, Rohde & Schwarz | 38.523-1 16.12.0 CR#3048 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.4 |
agreed | [WTS] [JSN] |
R5-224131 | Correction to Inter-RAT SON-MDT test case 8.1.6.2.1 | CR | Keysight Technologies UK, Qualcomm | 38.523-1 16.12.0 CR#3049 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-224132 | Correction to ENDC test cases 8.2.4.2.1.x |
CR revised to R5-225406 |
Keysight Technologies UK | 38.523-1 16.12.0 CR#3050 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.4 |
revised | [WTS] [JSN] |
R5-224133 | Correction to NR5GC IRAT test case 11.4.11 |
CR revised to R5-225409 |
Keysight Technologies UK | 38.523-1 16.12.0 CR#3051 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.4 |
revised | [WTS] [JSN] |
R5-224134 | Correction to IMS 5GS MT Call test case 7.33 | CR | Keysight Technologies UK | 34.229-5 16.3.0 CR#428 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
withdrawn | [WTS] [JSN] |
R5-224135 | Correction for IMS 5GS Call Control test case 7.21 |
CR revised to R5-225423 |
Keysight Technologies UK | 34.229-5 16.3.0 CR#429 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224136 | Correction to clause A.2.1 for EIEI test cases | CR | Keysight Technologies UK, Qualcomm | 34.229-1 16.2.0 CR#1501 catF | TEI14_Test, EIEI-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.1 |
agreed | [WTS] [JSN] |
R5-224137 | Correction to EIEI test case 11.3.2 | CR | Keysight Technologies UK, Qualcomm | 36.523-1 17.2.0 CR#5104 catF | TEI14_Test, EIEI-UEConTest | Rel-17 |
R5-96-e AI: 6.5.3.6 |
agreed | [WTS] [JSN] |
R5-224138 | Update IE ReportConfigNR | CR | Ericsson | 38.508-1 17.5.0 CR#2433 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-224139 | Add IE BeamFailureRecoveryServingCellConfig | CR | Ericsson | 38.508-1 17.5.0 CR#2434 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224140 | Add IE BetaOffsetsCrossPri | CR | Ericsson | 38.508-1 17.5.0 CR#2435 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224141 | Introduction of test frequencies for LTE Band 103 |
CR revised to R5-225776 |
Puloli | 36.508 17.2.0 CR#1392 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.41.1 |
revised | [WTS] [JSN] |
R5-224142 | Introduction of LTE Band 103 in clause 5 |
CR revised to R5-225777 |
Puloli | 36.521-1 17.3.0 CR#5410 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.41.2 |
revised | [WTS] [JSN] |
R5-224143 | Introduction of Band 103 for UE category NB1 and NB2 in transmit power test cases in clause 6.2 | CR | Puloli | 36.521-1 17.3.0 CR#5411 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.41.2 |
agreed | [WTS] [JSN] |
R5-224144 | WP UE Conformance Test Aspects for NR RF Requirement Enhancements for FR2 | Work Plan | Nokia, Nokia Shanghai Bell, Apple | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224145 | SR UE Conformance Test Aspects for NR RF Requirement Enhancements for FR2 | WI status report | Nokia, Nokia Shanghai Bell, Apple | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224146 | New WID on UE Conformance – Further enhancements of NR RF requirements for frequency range 2 (FR2) |
WID new revised to R5-225252 |
Nokia, Nokia Shanghai Bell, Apple | Rel-17 |
R5-96-e AI: 4.1 |
revised | [WTS] [JSN] | ||
R5-224147 | PRD21 CDS: PC3 EN-DC DC_3A-7A-20A_n8A and DC_3A_n8A | WI summary | Nokia, Nokia Shanghai Bell | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-16 |
R5-96-e AI: 7.3.4 |
available | [WTS] [JSN] | |
R5-224148 | PRD21 CDS: PC3 FR1 NR-DC DC_n48A_70A | WI summary | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-UEConTest | Rel-16 |
R5-96-e AI: 7.3.4 |
available | [WTS] [JSN] | |
R5-224149 | Introduction of test frequencies for Rel-16 inter-band DC_3A-7A-20A_n8A within FR1 | CR | Nokia, Nokia Shanghai Bell | 38.508-1 17.5.0 CR#2436 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.1.1 |
agreed | [WTS] [JSN] |
R5-224150 | Introduction of DC_3A-7A-20A_n8A for physical layer baseline implementation capabilities |
CR revised to R5-225700 |
Nokia, Nokia Shanghai Bell | 38.508-2 17.5.0 CR#353 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.2 |
revised | [WTS] [JSN] |
R5-224151 | Introduction of Output power requirements for DC_3A_n8A |
CR revised to R5-225705 |
Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#1397 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
revised | [WTS] [JSN] |
R5-224152 | Introduction of Allowed maximum configured output power relaxation for DC_3_n8 | CR | Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#1398 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224153 | Introduction of General Spurious emissions requirements for DC_3A_n8A | CR | Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#1399 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224154 | Introduction of Spurious emissions band UE co-existence limits Rel-16 for DC_3A_n8A | CR | Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#1400 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224155 | Introduction of Spurious emissions band UE co-existence Test description for DC_3A_n8A |
CR revised to R5-225706 |
Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#1401 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
revised | [WTS] [JSN] |
R5-224156 | Introduction of Spurious emissions band UE co-existence Rel-16 Test requirements for DC_3A_n8A | CR | Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#1402 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224157 | Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_3A_n8A |
CR revised to R5-225711 |
Nokia, Nokia Shanghai Bell | 38.905 17.5.0 CR#630 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
revised | [WTS] [JSN] |
R5-224158 | Introduction of reference sensitivity test point analysis for DC_3A-7A-20A_n8A | CR | Nokia, Nokia Shanghai Bell | 38.905 17.5.0 CR#631 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224159 | Introduction of DC_3A-7A-20A_n8A reference sensitivity 2-band fallback test requirements | CR | Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#1403 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.2 |
agreed | [WTS] [JSN] |
R5-224160 | Introduction of DC_3A-7A-20A_n8A reference sensitivity 3-band fallback test requirements | CR | Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#1404 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.2 |
agreed | [WTS] [JSN] |
R5-224161 | Introduction of Allowed reference sensitivity relaxation for DC_3A-7A-20A_n8A | CR | Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#1405 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.2 |
agreed | [WTS] [JSN] |
R5-224162 | Correction to LTE testcase 8.3.1.10 | CR | ROHDE & SCHWARZ | 36.523-1 17.2.0 CR#5105 catF | TEI8_Test | Rel-17 |
R5-96-e AI: 6.5.3.3.3 |
agreed | [WTS] [JSN] |
R5-224163 | Correction to LTE testcase 8.3.1.13 |
CR revised to R5-225419 |
ROHDE & SCHWARZ | 36.523-1 17.2.0 CR#5106 catF | TEI9_Test | Rel-17 |
R5-96-e AI: 6.5.3.3.3 |
revised | [WTS] [JSN] |
R5-224164 | WP for Enhanced IIoT and URLLC support for NR for RAN WG5 96-e | Work Plan | Nokia, Nokia Shanghai Bell | NR_IIOT_URLLC_enh-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224165 | Correction to NR5GC testcase 9.1.10.3 | CR | ROHDE & SCHWARZ, Anritsu Ltd, Qualcomm | 38.523-1 16.12.0 CR#3052 catF | TEI16_Test, eNS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.7 |
agreed | [WTS] [JSN] |
R5-224166 | Correction to Table 4.7.2-2 PDU Session Establishment Accept | CR | ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#2437 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.3 |
agreed | [WTS] [JSN] |
R5-224167 | Addition of NR-DC into symbols clause 3.2 | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1757 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.3 |
agreed | [WTS] [JSN] |
R5-224168 | Introduction of spurious emission TP analysis for CA_n48A-n70A |
CR revised to R5-225749 |
Nokia, Nokia Shanghai Bell | 38.905 17.5.0 CR#632 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.8 |
revised | [WTS] [JSN] |
R5-224169 | Introduction of General spurious emissions requirements for CA_n48A-n70A | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1758 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.1 |
agreed | [WTS] [JSN] |
R5-224170 | Introduction of Spurious emissions band UE co-existence Test configurations for CA_n48A-n70A | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1759 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.1 |
agreed | [WTS] [JSN] |
R5-224171 | Introduction of Reference sensitivity for inter-band NR-DC in FR1 | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1760 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.2 |
agreed | [WTS] [JSN] |
R5-224172 | Introduction of Maximum input level for inter-band NR-DC in FR1 | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1761 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.2 |
agreed | [WTS] [JSN] |
R5-224173 | Introduction of Adjacent channel selectivity for inter-band NR-DC in FR1 | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1762 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.2 |
agreed | [WTS] [JSN] |
R5-224174 | Introduction of Blocking characteristics for inter-band NR-DC in FR1 | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1763 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.2 |
agreed | [WTS] [JSN] |
R5-224175 | Introduction of Spurious response for inter-band NR-DC in FR1 | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1764 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.2 |
agreed | [WTS] [JSN] |
R5-224176 | Introduction of Intermodulation characteristics for inter-band NR-DC in FR1 | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1765 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.2 |
agreed | [WTS] [JSN] |
R5-224177 | Introduction of Spurious emissions for inter-band NR-DC in FR1 | CR | Nokia, Nokia Shanghai Bell | 38.521-1 17.5.0 CR#1766 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.2 |
agreed | [WTS] [JSN] |
R5-224178 | Introduction of configurations for Inter-band NR-DC within FR1 | CR | Nokia, Nokia Shanghai Bell | 38.508-2 17.5.0 CR#354 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.2 |
agreed | [WTS] [JSN] |
R5-224179 | Test frequencies for NR DC configurations in FR1 for signalling testing | CR | Nokia, Nokia Shanghai Bell | 38.508-1 17.5.0 CR#2438 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 6.3.18.1 |
agreed | [WTS] [JSN] |
R5-224180 | Correction to NR5GC MDT testcase 8.1.6.1.4.8 | CR | ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3053 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-224181 | Completion 4.7.7.1.1 and 6.7.9.1.1 including TT anaysis results |
CR revised to R5-225690 |
Sporton | 38.533 17.3.1 CR#1853 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224182 | Addition of new test case 4.7.7.1.2 EN-DC FR1 CSI-RS based CMR and no dedicated IMR configured and CSI-RS resource set with repetition off L1-SINR relative measurement accuracy | CR | Sporton | 38.533 17.3.1 CR#1854 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-224183 | Addition of new test case 6.7.9.1.2 NR SA FR1 CSI-RS based CMR and no dedicated IMR configured and CSI-RS resource set with repetition off L1-SINR relative measurement accuracy |
CR revised to R5-225691 |
Sporton | 38.533 17.3.1 CR#1855 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224184 | Completion 4.7.7.2 and 6.7.9.2 including TT anaysis results |
CR revised to R5-225692 |
Sporton | 38.533 17.3.1 CR#1856 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224185 | Completion 4.7.7.3.1 and 6.7.9.3.1 including TT anaysis results |
CR revised to R5-225693 |
Sporton | 38.533 17.3.1 CR#1857 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224186 | Addition of new test case 4.7.7.3.2 EN-DC FR1 CSI-RS based CMR and dedicated IMR L1-SINR relative measurement accuracy | CR | Sporton | 38.533 17.3.1 CR#1858 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-224187 | Addition of new test case 6.7.9.3.2 NR SA FR1 CSI-RS based CMR and dedicated IMR L1-SINR relative measurement accuracy |
CR revised to R5-225622 |
Sporton | 38.533 17.3.1 CR#1859 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224188 | Completion 7.7.6.1 including TT anaysis results |
CR revised to R5-225846 |
Sporton | 38.533 17.3.1 CR#1860 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224189 | Completion 7.7.6.2 including TT anaysis results |
CR revised to R5-225623 |
Sporton | 38.533 17.3.1 CR#1861 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224190 | Completion 7.7.6.3 including TT anaysis results |
CR revised to R5-225624 |
Sporton | 38.533 17.3.1 CR#1862 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224191 | Correction to NR5GC MDT testcase 8.1.6.1.1.2 | CR | ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3054 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-224192 | Correction to NR5GC MDT testcase 8.1.6.1.3.4 | CR | ROHDE & SCHWARZ, Qualcomm | 38.523-1 16.12.0 CR#3055 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-224193 | Correction to A.2.4 PRACK |
CR revised to R5-225421 |
ROHDE & SCHWARZ | 34.229-1 16.2.0 CR#1502 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.1 |
revised | [WTS] [JSN] |
R5-224194 | Correction to IMS test case 10.13 | CR | ROHDE & SCHWARZ | 34.229-5 16.3.0 CR#430 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-224195 | Correction to NR testcase 9.1.4.1 | CR | ROHDE & SCHWARZ, Qualcomm | 38.523-1 16.12.0 CR#3056 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.2 |
agreed | [WTS] [JSN] |
R5-224196 | Correction to NR testcases 8.1.5.7.1.1, 8.1.5.7.1.2 and 8.1.5.7.1.3 |
CR revised to R5-225281 |
ROHDE & SCHWARZ, MCC TF160 | 38.523-1 16.12.0 CR#3057 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.5 |
revised | [WTS] [JSN] |
R5-224197 | New WID on UE Conformance - NR QoE management and optimizations for diverse services |
WID new revised to R5-225253 |
Ericsson | Rel-17 |
R5-96-e AI: 4.1 |
revised | [WTS] [JSN] | ||
R5-224198 | Corrections to SystemInformationBlockType23-NB | CR | MCC TF160 | 36.508 17.2.0 CR#1393 catF | TEI15_Test, NB_IOTenh2-UEConTest | Rel-17 |
R5-96-e AI: 6.5.1 |
agreed | [WTS] [JSN] |
R5-224199 | Add new test case 9.2.1.1.32 for LTE multi-SIM devices attach | CR | China Telecom | 36.523-1 17.2.0 CR#5107 catF | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 6.3.20.7 |
agreed | [WTS] [JSN] |
R5-224200 | Correction to NR test case 8.1.5.2.2 | CR | ROHDE & SCHWARZ, Qualcomm | 38.523-1 16.12.0 CR#3058 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.5 |
agreed | [WTS] [JSN] |
R5-224201 | Correction to NR test case 8.1.1.4.1 | CR | ROHDE & SCHWARZ, Qualcomm | 38.523-1 16.12.0 CR#3059 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.1 |
agreed | [WTS] [JSN] |
R5-224202 | Correction to NR test case 7.1.1.1.2 | CR | ROHDE & SCHWARZ, Qualcomm | 38.523-1 16.12.0 CR#3060 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-224203 | Correction to NR testcase 7.1.1.1.1a | CR | ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3061 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-224204 | Correction of clause number for 4UL CA test requirement |
CR revised to R5-225699 |
Ericsson | 36.521-1 17.3.0 CR#5412 catF | LTE_CA_R15-UEConTest | Rel-17 |
R5-96-e AI: 5.3.1.2 |
revised | [WTS] [JSN] |
R5-224205 | Addition of 30 MHz ChBW to NS_27 for testing of A-MPR | CR | Ericsson | 38.521-1 17.5.0 CR#1767 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-224206 | Addition of 30 MHz ChBW for testing of NS_27 additional spectrum emission mask and spurious emissions | CR | Ericsson | 38.521-1 17.5.0 CR#1768 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-224207 | Adding test point analysis for A_MPR NS_27 with 30 MHz channel bandwidth | CR | Ericsson | 38.905 17.5.0 CR#633 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.8 |
agreed | [WTS] [JSN] |
R5-224208 | Update RF Baseline Implementation Capabilities for PC2 duty cycle |
CR revised to R5-225688 |
CMCC | 38.508-2 17.5.0 CR#355 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.2 |
revised | [WTS] [JSN] |
R5-224209 | Update RF Baseline Implementation Capabilities for PC1.5 duty cycle |
CR revised to R5-225685 |
CMCC | 38.508-2 17.5.0 CR#356 catF | LTE_NR_B41_Bn41_PC29dBm-UEConTest | Rel-17 |
R5-96-e AI: 5.3.22.1 |
revised | [WTS] [JSN] |
R5-224210 | Update RRC UE capability for PC1.5 duty cycle |
CR revised to R5-225323 |
CMCC | 38.523-1 16.12.0 CR#3062 catF | LTE_NR_B41_Bn41_PC29dBm-UEConTest | Rel-16 |
R5-96-e AI: 6.3.19.1 |
revised | [WTS] [JSN] |
R5-224211 | Update UE capability information elements for PC1.5 duty cycle |
CR revised to R5-225686 |
CMCC | 38.508-1 17.5.0 CR#2439 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.1 |
revised | [WTS] [JSN] |
R5-224212 | Update test procedure of MOP for TxD |
CR revised to R5-225687 |
CMCC | 38.521-1 17.5.0 CR#1769 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
revised | [WTS] [JSN] |
R5-224213 | Update test procedure of MOP |
CR revised to R5-225689 |
CMCC | 38.521-1 17.5.0 CR#1770 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
revised | [WTS] [JSN] |
R5-224214 | Discussion on handling of MOP with UE capability maxUplinkDutyCycle |
discussion revised to R5-225676 |
CMCC, Huawei, Hisilicon |
R5-96-e AI: 4.5.1 |
revised | [WTS] [JSN] | |||
R5-224215 | SR - NR_Rel-16_CA_DC after RAN5#96-e | WI status report | CMCC | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224216 | WP - NR_Rel-16_CA_DC after RAN5#96-e | Work Plan | CMCC | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224217 | SR - Rel-17 PC1.5 n79 after RAN5#96-e | WI status report | CMCC | NR_UE_PC1_5_n79-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224218 | WP - Rel-17 PC1.5 n79 after RAN5#96-e | Work Plan | CMCC | NR_UE_PC1_5_n79-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224219 | SR - Rel-17 PC2 n39 after RAN5#96-e | WI status report | CMCC | NR_UE_PC2_n39-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224220 | WP - Rel-17 PC2 n39 after RAN5#96-e | Work Plan | CMCC | NR_UE_PC2_n39-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224221 | Revised WID on UE Conformance - High power UE (power class 2) for NR band n39 | WID revised | CMCC | NR_UE_PC2_n39-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
R5-224222 | Update of A-SE for n39 | CR | CMCC | 38.521-1 17.5.0 CR#1771 catF | NR_UE_PC2_n39-UEConTest | Rel-17 |
R5-96-e AI: 5.3.25.2.1 |
agreed | [WTS] [JSN] |
R5-224223 | SR - FS_NR_Slice_Test after RAN5#96-e | WI status report | CMCC | FS_NR_Slice_Test | Rel-18 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224224 | WP - FS_NR_Slice_Test after RAN5#96-e | Work Plan | CMCC | FS_NR_Slice_Test | Rel-18 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224225 | Correction on test applicability of HST TCs |
CR revised to R5-225815 |
CMCC | 38.533 17.3.1 CR#1863 catF | TEI16_Test, NR_HST-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
revised | [WTS] [JSN] |
R5-224226 | SR Rel-17 HST enh after RAN5#96-e | WI status report | CMCC | NR_HST_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224227 | WP Rel-17 HST enh after RAN5#96-e | Work Plan | CMCC | NR_HST_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224228 | PRD21 on NR bands and 5G NR CADC config handling v1.2.0 | other | CMCC, Ericsson |
R5-96-e AI: 7.3.4 |
postponed | [WTS] [JSN] | |||
R5-224229 | Discussion on handling of PRD21 v120 |
discussion revised to R5-225269 |
CMCC, Ericsson, Huawei, Hisilicon, Keysight |
R5-96-e AI: 7.3.4 |
revised | [WTS] [JSN] | |||
R5-224230 | PRD21 CDS PC3 for CA_n3A-n41A | other | CMCC | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-16 |
R5-96-e AI: 7.3.4 |
available | [WTS] [JSN] | |
R5-224231 | Update Reference sensitivity exceptions for CA_n3A-n41A | CR | CMCC | 38.521-1 17.5.0 CR#1772 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.2 |
agreed | [WTS] [JSN] |
R5-224232 | Correction of test channel bandwidth for R15 |
CR revised to R5-225684 |
CAICT, Keysight Technologies UK Ltd | 38.508-1 17.5.0 CR#2440 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.1 |
revised | [WTS] [JSN] |
R5-224233 | Correction of test channel bandwidth for R16 |
CR revised to R5-225681 |
CAICT | 38.508-1 17.5.0 CR#2441 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.1.1 |
revised | [WTS] [JSN] |
R5-224234 | Correction of test channel bandwidth for n79 |
CR revised to R5-225682 |
CAICT, Tejet | 38.508-1 17.5.0 CR#2442 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.1 |
revised | [WTS] [JSN] |
R5-224235 | Correction of the styles of the subclauses in 4.3.1.1 and 4.3.1.2 | CR | CAICT | 38.508-1 17.5.0 CR#2443 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.1 |
agreed | [WTS] [JSN] |
R5-224236 | Removing of n89, n91, n92, n93 and n94 from A.4.3.1 |
CR revised to R5-225717 |
CAICT | 38.508-2 17.5.0 CR#357 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.2 |
revised | [WTS] [JSN] |
R5-224237 | Editorial correction for Table A.4.3.7-1 and Table A.4.4-2 |
CR revised to R5-225270 |
CAICT, TTA | 38.508-2 17.5.0 CR#358 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.2 |
revised | [WTS] [JSN] |
R5-224238 | Addition of Operating bands in Table 5.2-1 |
CR revised to R5-225791 |
CAICT | 38.521-1 17.5.0 CR#1773 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.3 |
revised | [WTS] [JSN] |
R5-224239 | Moving n53 to the right position in Table 5.3.5-1 | CR | CAICT | 38.521-1 17.5.0 CR#1774 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.3.3 |
withdrawn | [WTS] [JSN] |
R5-224240 | Correction of additional tolerance to test requirement of R15 Transmitter power test cases |
CR revised to R5-225784 |
CAICT | 38.521-1 17.5.0 CR#1775 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
revised | [WTS] [JSN] |
R5-224241 | Correction of additional tolerance to test requirement in 6.2F.1.5 and 6.2F.3.5 | CR | CAICT | 38.521-1 17.5.0 CR#1776 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.4.1 |
agreed | [WTS] [JSN] |
R5-224242 | Adding additional tolerance to test requirement of TxD Transmitter power test cases | CR | CAICT | 38.521-1 17.5.0 CR#1777 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-224243 | Correction of additional test points for asymmetric channel bandwidths in Rx test cases | CR | CAICT | 38.521-1 17.5.0 CR#1778 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.2 |
agreed | [WTS] [JSN] |
R5-224244 | Correction of Table 7.3F.2.4.1-1 | CR | CAICT | 38.521-1 17.5.0 CR#1779 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.4.2 |
agreed | [WTS] [JSN] |
R5-224245 | Removing of n91, n92, n93 and n94 from 7.3I.2 | CR | CAICT | 38.521-1 17.5.0 CR#1780 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.3.2 |
agreed | [WTS] [JSN] |
R5-224246 | Removing of n91, n92, n93 and n94 from 7.6.2 | CR | CAICT | 38.521-1 17.5.0 CR#1781 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.3.2 |
agreed | [WTS] [JSN] |
R5-224247 | Correction of the SCS value in Table 5.3.5-1 for n259 | CR | CAICT | 38.521-2 16.12.0 CR#772 catF | NR_bands_BW_R16-UEConTest | Rel-16 |
R5-96-e AI: 5.3.4.4.3 |
agreed | [WTS] [JSN] |
R5-224248 | Correction of the clause numbers and table numbers in 7.3A.3 | CR | CAICT | 38.521-2 16.12.0 CR#773 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.2 |
agreed | [WTS] [JSN] |
R5-224249 | Correction of Power Class 2 test requirements in 6.2B.1.3.5 for Interband EN-DC FDD and TDD Duplex-mode |
CR revised to R5-225799 |
CAICT | 38.521-3 17.5.0 CR#1406 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-224250 | Correction of Applicability of conformance test cases conditions and Tested Bands Selection Criteria for the R15 test cases in 38.521-1 |
CR revised to R5-225814 |
CAICT | 38.522 17.5.0 CR#192 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.8 |
revised | [WTS] [JSN] |
R5-224251 | Correction of Tested Bands Selection Criteria for FR1 shared spectrum channel access | CR | CAICT | 38.522 17.5.0 CR#193 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.7 |
withdrawn | [WTS] [JSN] |
R5-224252 | Correction of Applicability of conformance test cases conditions, Tested Bands Selection Criteria and Branch for the TxD test cases in 38.521-1 |
CR revised to R5-225764 |
CAICT | 38.522 17.5.0 CR#194 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.4 |
revised | [WTS] [JSN] |
R5-224253 | Correction of Tested Bands Selection Criteria for FR1 sidelink | CR | CAICT | 38.522 17.5.0 CR#195 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.7 |
withdrawn | [WTS] [JSN] |
R5-224254 | Correction of test points analysis of some Rx test cases in 38.521-1 for the addition of test points for asymmetric channel bandwidths and UL-MIMO | CR | CAICT | 38.905 17.5.0 CR#634 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-224255 | Discussion on precondition for the updating of test channel bandwidths in 38.508-1 | discussion | CAICT | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | |
R5-224256 | Discussion on the treatment for the pending R15 NR FR1 band n50 and n86 | discussion | CAICT | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | |
R5-224257 | Editorial correction to TC 6.5.3.3 |
CR revised to R5-225785 |
Tejet | 38.521-1 17.5.0 CR#1782 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
revised | [WTS] [JSN] |
R5-224258 | Editorial correction to Table 4.3.1.0C-1 | CR | Tejet | 38.508-1 17.5.0 CR#2444 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.1 |
withdrawn | [WTS] [JSN] |
R5-224259 | Add new test case 11.8.5 Handover from 5GS to EPC/ePDG for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system | CR | China Telecom | 36.523-1 17.2.0 CR#5108 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 6.4.4.11 |
withdrawn | [WTS] [JSN] |
R5-224260 | WP UE Conformance NR Coverage Enhancement RAN5#96e | Work Plan | China Telecom | NR_cov_enh-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224261 | SR UE Conformance NR Coverage Enhancement RAN5#96e | WI status report | China Telecom | NR_cov_enh-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224262 | SR UE Conformance SAR schemes for UE power class 2 (PC2) for NR inter-band Carrier Aggregation and supplemental uplink (SUL) configurations with 2 bands UL RAN5#96e | WI status report | China Telecom | NR_SAR_PC2_interB_SUL_2BUL-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224263 | WP UE Conformance SAR schemes for UE power class 2 (PC2) for NR inter-band Carrier Aggregation and supplemental uplink (SUL) configurations with 2 bands UL RAN5#96e | Work Plan | China Telecom | NR_SAR_PC2_interB_SUL_2BUL-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224264 | SR UE Conformance Rel-17 High power UE for NR inter-band Carrier Aggregation with 2 bands downlink and x bands uplink (x=1,2) RAN5#96e | WI status report | China Telecom | NR_PC2_CA_R17_2BDL_2BUL-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224265 | WP UE Conformance Rel-17 High power UE for NR inter-band Carrier Aggregation with 2 bands downlink and x bands uplink (x=1,2) RAN5#96e | Work Plan | China Telecom | NR_PC2_CA_R17_2BDL_2BUL-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224266 | SR UE Conformance Further enhancement on NR demodulation performance RAN5#96e | WI status report | China Telecom, Qualcomm | NR_demod_enh2-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224267 | Add UE new message 3 repetition implementation capability | CR | China Telecom | 38.508-2 17.5.0 CR#359 catF | NR_cov_enh-UEConTest | Rel-17 |
R5-96-e AI: 6.3.22.2 |
agreed | [WTS] [JSN] |
R5-224268 | Add applicability for Msg3 repetition protocol test case |
CR revised to R5-225332 |
China Telecom | 38.523-2 16.12.0 CR#239 catF | NR_cov_enh-UEConTest | Rel-17 |
R5-96-e AI: 6.3.22.4 |
revised | [WTS] [JSN] |
R5-224269 | Add Msg3 repetition protocol test case | CR | China Telecom | 38.523-1 16.12.0 CR#3063 catF | NR_cov_enh-UEConTest | Rel-17 |
R5-96-e AI: 6.3.22.3 |
agreed | [WTS] [JSN] |
R5-224270 | Add PC2 configuration for CA_n3A-n78A | CR | China Telecom | 38.521-1 17.5.0 CR#1783 catF | NR_PC2_CA_R17_2BDL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.21.3.3 |
withdrawn | [WTS] [JSN] |
R5-224271 | Add PC2 configuration for n78 with DL CA_n1A-n78A | CR | China Telecom | 38.521-1 17.5.0 CR#1784 catF | NR_PC2_CA_R17_2BDL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.21.3.3 |
withdrawn | [WTS] [JSN] |
R5-224272 | Introduction of PC2 inter-band CA ICS for UL CA_n1A-n78A | CR | China Telecom | 38.508-2 17.5.0 CR#360 catF | NR_SAR_PC2_interB_SUL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.20.2 |
agreed | [WTS] [JSN] |
R5-224273 | Introduction of REFSENS test requirements for PC2 UL CA_n1A-n78A |
CR revised to R5-225751 |
China Telecom | 38.521-1 17.5.0 CR#1785 catF | NR_SAR_PC2_interB_SUL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.20.3.2 |
revised | [WTS] [JSN] |
R5-224274 | Update of MOP test case for UL CA_n1A-n78A | CR | China Telecom | 38.521-1 17.5.0 CR#1786 catF | NR_SAR_PC2_interB_SUL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.20.3.1 |
agreed | [WTS] [JSN] |
R5-224275 | Update of inter-band CA PC2 test applicability |
CR revised to R5-225752 |
China Telecom | 38.522 17.5.0 CR#196 catF | NR_SAR_PC2_interB_SUL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.20.4 |
revised | [WTS] [JSN] |
R5-224276 | Add IE CandidateBeamRS | CR | Ericsson | 38.508-1 17.5.0 CR#2445 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224277 | Updates to IMS emergency over LTE test cases 19.4.5, 19.4.6 and 19.4.7 | CR | MCC TF160 | 34.229-1 16.2.0 CR#1503 catF | TEI9_Test | Rel-16 |
R5-96-e AI: 6.6.6.1 |
agreed | [WTS] [JSN] |
R5-224278 | Updates to IMS emergency over 5G test cases 10.1 and 10.2 |
CR revised to R5-225424 |
MCC TF160, Huawei, HiSilicon | 34.229-5 16.3.0 CR#431 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224279 | Corrections to IMS emergency over 5G test case 10.15 |
CR revised to R5-225425 |
MCC TF160 | 34.229-5 16.3.0 CR#432 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224280 | WP UE Conformance – Rel-17 Enhancement of Private Network Support for NG-RAN including CT aspects RAN5#96-e | Work Plan | China Telecom | NG_RAN_PRN_enh_plus_CT-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224281 | Corrections to A-MPR test requirements for NS_04 |
CR revised to R5-225786 |
Google Inc. | 38.521-1 17.5.0 CR#1787 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
revised | [WTS] [JSN] |
R5-224282 | SR UE Conformance – Rel-17 Enhancement of Private Network Support for NG-RAN including CT aspects RAN5#96-e | WI status report | China Telecom | NG_RAN_PRN_enh_plus_CT-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224283 | TxD MPR test requirements for PC 1.5 FWA UEs |
CR revised to R5-225753 |
Google Inc., Verizon | 38.521-1 17.5.0 CR#1788 catF | HPUE_PC1_5_n77_n78-UEConTest | Rel-17 |
R5-96-e AI: 5.3.26.2.1 |
revised | [WTS] [JSN] |
R5-224284 | Add IE CFR-ConfigMulticast | CR | Ericsson | 38.508-1 17.5.0 CR#2446 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224285 | TxD A-MPR test requirements for NS_04 |
CR revised to R5-225756 |
Google Inc. | 38.521-1 17.5.0 CR#1789 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
revised | [WTS] [JSN] |
R5-224286 | UL MIMO MPR Tests for PC1.5 UEs |
CR revised to R5-225754 |
Google Inc. | 38.521-1 17.5.0 CR#1790 catF | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.27.2.1 |
revised | [WTS] [JSN] |
R5-224287 | General updates of clause 5 for R17 new CBW configurations |
CR revised to R5-225729 |
China Unicom, CAICT | 38.521-1 17.5.0 CR#1791 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.3 |
revised | [WTS] [JSN] |
R5-224288 | Addition of PICS for NR Multi-SIM devices | CR | China Telecom | 38.508-2 17.5.0 CR#361 catF | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 6.3.20.2 |
agreed | [WTS] [JSN] |
R5-224289 | Updates of clause 5 for R15 bands and CBW configurations | CR | China Unicom | 38.521-1 17.5.0 CR#1792 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.3 |
agreed | [WTS] [JSN] |
R5-224290 | Add IEs DL-PRS-ProcessingWindowPreConfig, DMRS-BundlingPUCCH-Config and DMRS-BundlingPUSCH-Config | CR | Ericsson | 38.508-1 17.5.0 CR#2447 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224291 | 7.3A.1_1 - Test requirements corrections | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1793 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.2 |
agreed | [WTS] [JSN] |
R5-224292 | NS_15 minimum requirements missing in test case 6.5.3.3 | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1794 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.3.1 |
agreed | [WTS] [JSN] |
R5-224293 | Requirement correction for ON power in test 6.3D.3 | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1795 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-224294 | Test procedure and requirement correction in OBW test 6.5D.1 |
CR revised to R5-225787 |
Keysight Technologies UK Ltd, Huawei, HiSilicon | 38.521-1 17.5.0 CR#1796 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
revised | [WTS] [JSN] |
R5-224295 | PCC-SCC Prio in FR1 - p-Max message exception clarification in MOP CA test | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1797 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
withdrawn | [WTS] [JSN] |
R5-224296 | PCC-SCC Prio in FR1 - p-Max message exception clarification in MPR CA test | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1798 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
withdrawn | [WTS] [JSN] |
R5-224297 | PCC-SCC Prio in FR1 - p-Max message exception clarification in OBW CA test | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1799 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
withdrawn | [WTS] [JSN] |
R5-224298 | PCC-SCC Prio in FR1 - p-Max message exception clarification in SEM CA test | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1800 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
withdrawn | [WTS] [JSN] |
R5-224299 | PCC-SCC Prio in FR1 - p-Max message exception clarification in spurious emissions CA test | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1801 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
withdrawn | [WTS] [JSN] |
R5-224300 | 7.3.2 - Test requirements corrections | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1802 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.2 |
agreed | [WTS] [JSN] |
R5-224301 | General clean up in 38.521-1 annex F | CR | Keysight Technologies UK Ltd | 38.521-1 17.5.0 CR#1803 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.3 |
agreed | [WTS] [JSN] |
R5-224302 | Applicable NR-ARFCN correction for n259 |
CR revised to R5-225719 |
Keysight Technologies UK Ltd | 38.521-2 16.12.0 CR#774 catF | NR_bands_BW_R16-UEConTest | Rel-16 |
R5-96-e AI: 5.3.4.4.3 |
revised | [WTS] [JSN] |
R5-224303 | PUCCH format correction to test DFT-s-OFDM in FR2 | CR | Keysight Technologies UK Ltd | 38.521-2 16.12.0 CR#775 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-224304 | PC1 - MU and TT definition for MOP in 38.521-2 |
CR revised to R5-225664 |
Keysight Technologies UK Ltd | 38.521-2 16.12.0 CR#776 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-224305 | FR2 SA EVM test case update based on TT analysis | CR | Keysight Technologies UK Ltd | 38.521-2 16.12.0 CR#777 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-224306 | PC1 - MU and TT definition for REFSENS in 38.521-2 |
CR revised to R5-225665 |
Keysight Technologies UK Ltd | 38.521-2 16.12.0 CR#778 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.2 |
revised | [WTS] [JSN] |
R5-224307 | PC1 MU - General Editor notes update in 38.521-3 FR2 Tx tests |
CR revised to R5-225657 |
Keysight Technologies UK Ltd | 38.521-3 17.5.0 CR#1407 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-224308 | FR2 NSA EVM test case editor notes update | CR | Keysight Technologies UK Ltd | 38.521-3 17.5.0 CR#1408 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-224309 | PC1 MU - General Editor notes update in 38.521-3 FR2 Rx tests |
CR revised to R5-225668 |
Keysight Technologies UK Ltd | 38.521-3 17.5.0 CR#1409 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.2 |
revised | [WTS] [JSN] |
R5-224310 | PC1 MU - definition for MOP in 38.903 |
CR revised to R5-225671 |
Keysight Technologies UK Ltd, Anritsu | 38.903 16.12.0 CR#335 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-224311 | PC1 MU - definition for REFSENS in 38.903 |
CR revised to R5-225672 |
Keysight Technologies UK Ltd, Anritsu | 38.903 16.12.0 CR#336 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-224312 | PC1 MU - General Update in 38.903 section B.2.2 |
CR revised to R5-225673 |
Keysight Technologies UK Ltd | 38.903 16.12.0 CR#337 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-224313 | Draft ITU-R recommendation on Unwanted Emissions for IMT-2020 (5G) from TS 36.521-1 | discussion | Nanjing Ericsson Panda Com Ltd |
R5-96-e AI: 4.2.2 |
noted | [WTS] [JSN] | |||
R5-224314 | Draft ITU-R recommendation on Unwanted Emissions for IMT-2020 (5G) from TS 38.521-1 | discussion | Nanjing Ericsson Panda Com Ltd |
R5-96-e AI: 4.2.2 |
noted | [WTS] [JSN] | |||
R5-224315 | Draft ITU-R recommendation on Unwanted Emissions for IMT-2020 (5G) | discussion | Ericsson, Huawei, Apple |
R5-96-e AI: 4.2.2 |
approved | [WTS] [JSN] | |||
R5-224316 | LS on work towards two new recommendations "Generic unwanted emission characteristics of base stations/mobile stations using the terrestrial radio interfaces of IMT-2020" |
LS out LS is reply to R5-216419 LS To: TSG RAN |
Nanjing Ericsson Panda Com Ltd |
R5-96-e AI: 7.5 |
approved | [WTS] [JSN] | |||
R5-224317 | Correction to 5GS IMS test case 10.6 |
CR revised to R5-225426 |
ANRITSU LTD | 34.229-5 16.3.0 CR#433 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224318 | WP UE Conformance Test Aspects - Rel-16 Private Network Support for NG-RAN | Work Plan | Qualcomm CDMA Technologies | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224319 | SR UE Conformance Test Aspects - Rel-16 Private Network Support for NG-RAN | WI status report | Qualcomm CDMA Technologies | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224320 | WP UE Conformance Test Aspects - Rel-17 NR small data transmissions in INACTIVE state | Work Plan | Qualcomm CDMA Technologies | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224321 | SR UE Conformance Test Aspects - Rel-17 NR small data transmissions in INACTIVE state | WI status report | Qualcomm CDMA Technologies | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224322 | Way Forward for Rel-15 NR Tests Applicability on SNPN Only UE | discussion | Qualcomm CDMA Technologies | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.28.6 |
noted | [WTS] [JSN] | |
R5-224323 | Discussion paper for handling legacy test case for Redcap Only UE | discussion | Qualcomm CDMA Technologies | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.6 |
noted | [WTS] [JSN] | |
R5-224324 | Encoding of USSD string in SIP Invite for USSD cal | discussion | Qualcomm CDMA Technologies | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-15 |
R5-96-e AI: 6.6.6.6 |
noted | [WTS] [JSN] | |
R5-224325 | Discussion paper on TLB mode for SDT | discussion | Qualcomm CDMA Technologies | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.6 |
noted | [WTS] [JSN] | |
R5-224326 | Updates to Table 4.6.3-16: CellAccessRelatedInfo for NPN |
CR revised to R5-225299 |
Qualcomm CDMA Technologies, Anritsu | 38.508-1 17.5.0 CR#2448 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.1 |
revised | [WTS] [JSN] |
R5-224327 | Update of Table 4.6.1-30 to add message contents values for SDT in UEAssistanceInformation |
CR revised to R5-225352 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2449 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
revised | [WTS] [JSN] |
R5-224328 | Update of Table 4.6.1-28 to add message contents values for SDT in SIB1 |
CR revised to R5-225353 |
Qualcomm CDMA Technologies, Huawei, Hisilicon | 38.508-1 17.5.0 CR#2450 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
revised | [WTS] [JSN] |
R5-224329 | Update of Table 4.6.1-16 to add message contents values for SDT in RRCRelease |
CR revised to R5-225354 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2451 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
revised | [WTS] [JSN] |
R5-224330 | Update of Table 4.6.4-38 to add message contents values for SDT in RF Parameters | CR | Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2452 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
withdrawn | [WTS] [JSN] |
R5-224331 | Addition of new PICS for SDT feature | CR | Qualcomm CDMA Technologies | 38.508-2 17.5.0 CR#362 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.2 |
agreed | [WTS] [JSN] |
R5-224332 | Update of Table 4.6.3-96 to add message contents values for SDT in PDCCH-ConfigCommon |
CR revised to R5-225355 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2453 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
revised | [WTS] [JSN] |
R5-224333 | Addition of message contents values for SDT in CG-SDT-Configuration-r17 |
CR revised to R5-225277 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2454 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
revised | [WTS] [JSN] |
R5-224334 | Update to Table 4.6.4-49 to add SDT in UE-NR-Capability |
CR revised to R5-225278 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2455 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
revised | [WTS] [JSN] |
R5-224335 | Addition of PICS for "SNPN Only" UE |
CR revised to R5-225301 |
Qualcomm CDMA Technologies | 38.508-2 17.5.0 CR#363 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.2 |
revised | [WTS] [JSN] |
R5-224336 | Addition of Test Environment for legacy test cases applicable to SNPN Only UE |
CR revised to R5-225300 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2456 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.1 |
revised | [WTS] [JSN] |
R5-224337 | Correction to Idle Mode Test Case to enable SNPN Only UE |
CR revised to R5-225302 |
Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#3064 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
revised | [WTS] [JSN] |
R5-224338 | Addition of legacy test cases applicable to SNPN Only UE |
CR revised to R5-225309 |
Qualcomm CDMA Technologies | 38.523-2 16.12.0 CR#240 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.4 |
revised | [WTS] [JSN] |
R5-224339 | Correction to SNPN TC 6.5.1.2 |
CR revised to R5-225303 |
Qualcomm CDMA Technologies, Anritsu | 38.523-1 16.12.0 CR#3065 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
revised | [WTS] [JSN] |
R5-224340 | Editorial Correction - Add VOID to CAG TC 6.5.2.5 | CR | Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#3066 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-224341 | Editorial Correction - Add VOID to CAG TC 6.5.2.5 | CR | Qualcomm CDMA Technologies | 38.523-2 16.12.0 CR#241 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.4 |
agreed | [WTS] [JSN] |
R5-224342 | Correction to NR 5GC CAG TC 6.5.2.4 | CR | Qualcomm CDMA Technologies, Keysight Technologies | 38.523-1 16.12.0 CR#3067 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-224343 | Updates to Table 4.6.3-16: CellAccessRelatedInfo for NPN | CR | Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2457 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.1 |
withdrawn | [WTS] [JSN] |
R5-224344 | Correction to SNPN NAS test case 9.1.11.1 | CR | Qualcomm CDMA Technologies, Anritsu | 38.523-1 16.12.0 CR#3068 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-224345 | Addition of Access Identity related SNPN PICS | CR | Qualcomm CDMA Technologies | 38.508-2 17.5.0 CR#364 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.2 |
withdrawn | [WTS] [JSN] |
R5-224346 | Correction to NR 5GC CAG testcase 8.1.7.1.1 |
CR revised to R5-225304 |
Qualcomm CDMA Technologies, Anritsu, MediaTek Inc. | 38.523-1 16.12.0 CR#3069 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
revised | [WTS] [JSN] |
R5-224347 | Corrections to SNPN test case 10.1.7.1 | CR | Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#3070 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
withdrawn | [WTS] [JSN] |
R5-224348 | Corrections to NR 5GC Inter RAT MDT TC 8.1.6.2.1 | CR | Qualcomm CDMA Technologies, Keysight Technologies, Anritsu | 38.523-1 16.12.0 CR#3071 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
withdrawn | [WTS] [JSN] |
R5-224349 | Correction to NR MAC test case 7.1.1.8.1 | CR | Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#3072 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
withdrawn | [WTS] [JSN] |
R5-224350 | Addition of new PICs dl-SchedulingOffset-PDSCH-TypeA |
CR revised to R5-225369 |
Qualcomm CDMA Technologies | 38.508-2 17.5.0 CR#365 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.2 |
revised | [WTS] [JSN] |
R5-224351 | Editorial Corrections for TC 9.1.2.6 |
CR revised to R5-225283 |
Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#3073 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.2 |
revised | [WTS] [JSN] |
R5-224352 | Editorial update to UAC test case 11.3.8 | CR | Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#3074 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
agreed | [WTS] [JSN] |
R5-224353 | Corrections to eNS TC 9.1.10.4 | CR | Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#3075 catF | TEI16_Test, eNS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.7 |
withdrawn | [WTS] [JSN] |
R5-224354 | Corrections to NR TC 8.1.4.4.2 | CR | Qualcomm CDMA Technologies, Anritsu | 38.523-1 16.12.0 CR#3076 catF | NR_Mob_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.6.3 |
agreed | [WTS] [JSN] |
R5-224355 | Correction to NR TC 8.1.4.4.4 | CR | Qualcomm CDMA Technologies, Anritsu | 38.523-1 16.12.0 CR#3077 catF | NR_Mob_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.6.3 |
agreed | [WTS] [JSN] |
R5-224356 | Corrections to Applicability of NR TC 8.1.4.4.4 | CR | Qualcomm CDMA Technologies | 38.523-2 16.12.0 CR#242 catF | NR_Mob_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.6.4 |
agreed | [WTS] [JSN] |
R5-224357 | Editorial update to NR Test case 9.1.6.1.3 |
CR revised to R5-225407 |
Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#3078 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.3 |
revised | [WTS] [JSN] |
R5-224358 | Updating Spurious emission for UE co-existence TC for CA_n2-n77, CA_n5-n77, CA_n66-n77 | CR | Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.521-1 17.5.0 CR#1804 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.3 |
withdrawn | [WTS] [JSN] |
R5-224359 | Updating Spurious emission for UE co-existence TC for CA_n2-n77, CA_n5-n77, CA_n66-n77 |
CR revised to R5-225702 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.521-1 17.5.0 CR#1805 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.1 |
revised | [WTS] [JSN] |
R5-224360 | Update TP analysis for Rel-16 CA_n2A_n77A |
CR revised to R5-225712 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.905 17.5.0 CR#635 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
revised | [WTS] [JSN] |
R5-224361 | Update TP analysis for Rel-16 CA_n5A_n77A |
CR revised to R5-225713 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.905 17.5.0 CR#636 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
revised | [WTS] [JSN] |
R5-224362 | Update TP analysis for Rel-16 CA_n66A_n77A |
CR revised to R5-225714 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.905 17.5.0 CR#637 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
revised | [WTS] [JSN] |
R5-224363 | Update Rx Requirements for additional Rel-16 CA combos |
CR revised to R5-225703 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.521-1 17.5.0 CR#1806 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.2 |
revised | [WTS] [JSN] |
R5-224364 | TP analysis for ref sensitivity for Rel-16 NR CA combos |
CR revised to R5-225715 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.905 17.5.0 CR#638 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
revised | [WTS] [JSN] |
R5-224365 | WP for HPUE_PC1_5_n77_n78-UEConTest for RAN5#96-e | Work Plan | Verizon Switzerland AG | HPUE_PC1_5_n77_n78-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224366 | SR UE Conformance - High-power UE (power class 1.5) operation in NR bands n77 and n78 | WI status report | Verizon Switzerland AG | HPUE_PC1_5_n77_n78-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224367 | PRD21 CDS for CA_n1A-n78A PC2 | other | China Telecom | Rel-17 |
R5-96-e AI: 7.3.4 |
available | [WTS] [JSN] | ||
R5-224368 | Addition of test applicability for FR2 EN-DC TX Test Cases 5CC to 8CCs |
CR revised to R5-225710 |
Sporton | 38.522 17.5.0 CR#197 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.7 |
revised | [WTS] [JSN] |
R5-224369 | Addition of test capability for FR2 EN-DC TX Test Cases 5CC to 7CCs | CR | Sporton | 38.522 17.5.0 CR#198 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.2 |
withdrawn | [WTS] [JSN] |
R5-224370 | Update of FR2 5 to 8UL CA Test Cases |
CR revised to R5-225679 |
Sporton | 38.521-2 16.12.0 CR#779 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-224371 | Update of FR2 5CC to 8CCs Transmission Test Cases |
CR revised to R5-225678 |
Sporton | 38.521-3 17.5.0 CR#1410 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
revised | [WTS] [JSN] |
R5-224372 | Replacing the word LTE by E-UTRA in description of exception requirement |
CR revised to R5-225800 |
Sporton, Ericsson | 38.521-3 17.5.0 CR#1411 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-224373 | Add applicability for LTE Multi-SIM test cases | CR | China Telecom | 36.523-2 17.2.0 CR#1372 catF | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 6.3.20.8 |
agreed | [WTS] [JSN] |
R5-224374 | Add new LTE Multi-SIM test case 9.2.3.1.29 | CR | China Telecom | 36.523-1 17.2.0 CR#5109 catF | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 6.3.20.7 |
agreed | [WTS] [JSN] |
R5-224375 | Addition of test capability for FR2 EN-DC TX Test Cases 5CC to 7CCs |
CR revised to R5-225701 |
Sporton | 38.508-2 17.5.0 CR#366 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.2 |
revised | [WTS] [JSN] |
R5-224376 | Correction to Intra NR MDT test cases 8.1.6.1.x |
CR revised to R5-225389 |
MCC TF160, MediaTek Inc. | 38.523-1 16.12.0 CR#3079 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
revised | [WTS] [JSN] |
R5-224377 | Add applicability for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system test cases | CR | China Telecom | 36.523-2 17.2.0 CR#1373 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 6.5.4 |
withdrawn | [WTS] [JSN] |
R5-224378 | Add IEs DRX-ConfigSL, EphemerisInfo, FeatureCombination and FeatureCombinationPreambles |
CR revised to R5-225363 |
Ericsson | 38.508-1 17.5.0 CR#2458 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
revised | [WTS] [JSN] |
R5-224379 | Addition of pics for testing LTE positioning methods on NR |
CR revised to R5-225315 |
ROHDE & SCHWARZ | 37.571-3 16.12.0 CR#155 catB | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.6 |
revised | [WTS] [JSN] |
R5-224380 | Add IE FreqPriorityListNRSlicing | CR | Ericsson | 38.508-1 17.5.0 CR#2459 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224381 | Update of clause and description for eMIMO RRM Test Cases according to WP updated | CR | Sporton | 38.522 17.5.0 CR#199 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.7 |
agreed | [WTS] [JSN] |
R5-224382 | Correction to LPP Provide Capabilities template for subclause 9 test cases |
CR revised to R5-225313 |
ROHDE & SCHWARZ | 37.571-2 16.12.0 CR#161 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.5 |
revised | [WTS] [JSN] |
R5-224383 | Correction to NR testcase 8.2.6.2.2 | CR | ROHDE & SCHWARZ, Qualcomm | 38.523-1 16.12.0 CR#3080 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.6 |
agreed | [WTS] [JSN] |
R5-224384 | Correction to NR testcase 7.1.1.6.3 |
CR revised to R5-225377 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3081 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
revised | [WTS] [JSN] |
R5-224385 | Correction to NR CAG testcase 6.5.2.1 |
CR revised to R5-225305 |
ROHDE & SCHWARZ, Mediatek | 38.523-1 16.12.0 CR#3082 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
revised | [WTS] [JSN] |
R5-224386 | Correction to EPS FB Test case 11.1.2 |
CR revised to R5-225449 |
ANRITSU LTD, Huawei, HiSilicon, ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3083 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.1 |
revised | [WTS] [JSN] |
R5-224387 | Correction to NR CAG testcase 6.5.2.2 | CR | ROHDE & SCHWARZ, Huawei, Hisilicon | 38.523-3 17.3.0 CR#2701 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.3 |
withdrawn | [WTS] [JSN] |
R5-224388 | Correction to NR5GC CAG TC 6.5.2.3 | CR | ROHDE & SCHWARZ, Huawei, Hisilicon | 38.523-1 16.12.0 CR#3084 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-224389 | Correction to 5GS IMS test case 7.33 |
CR revised to R5-225427 |
ANRITSU LTD, Google, Keysight | 34.229-5 16.3.0 CR#434 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224390 | Correction to NR CAG testcase 6.5.2.6 |
CR revised to R5-225307 |
ROHDE & SCHWARZ, Huawei, Hisilicon, MediaTek | 38.523-1 16.12.0 CR#3085 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
revised | [WTS] [JSN] |
R5-224391 | Addition of message contents values for SDT in SDT-ConfigCommonSIB-r17 | CR | Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2460 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
withdrawn | [WTS] [JSN] |
R5-224392 | Addition of message contents values for SDT in SDT-Config-r17 | CR | Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#2461 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
withdrawn | [WTS] [JSN] |
R5-224393 | Correction to 5GS IMS test case 7.2 | CR | ANRITSU LTD | 34.229-5 16.3.0 CR#435 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
withdrawn | [WTS] [JSN] |
R5-224394 | WP - UE Conformance Test Aspects - 29 dBm UE Power Class for LTE Band 41and NR Band n41 (UID-920068) | Work Plan | T-Mobile USA Inc. | LTE_NR_B41_Bn41_PC29dBm-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224395 | SR - UE Conformance Test Aspects - 29 dBm UE Power Class for LTE Band 41and NR Band n41 (UID-920068) | WI status report | T-Mobile USA Inc. | LTE_NR_B41_Bn41_PC29dBm-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224396 | Revised WID - UE Conformance Test Aspects - 29 dBm UE Power Class for LTE Band 41and NR Band n41 | WID revised | T-Mobile USA Inc. | LTE_NR_B41_Bn41_PC29dBm-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
R5-224397 | Removal of PC1.5 n41 from TC 6.2.3 A-MPR |
CR revised to R5-225204 |
T-Mobile USA Inc. | 38.521-1 17.5.0 CR#1807 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
revised | [WTS] [JSN] |
R5-224398 | Add new test case 13.6.2 Handover from EPC/ePDG to 5GS for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system | CR | China Telecom | 36.523-1 17.2.0 CR#5110 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 6.5.3.8 |
withdrawn | [WTS] [JSN] |
R5-224399 | Correction of the scheduling information for combination NR-15 |
CR revised to R5-225311 |
CATT | 38.508-1 17.5.0 CR#2462 catF | NR_pos-UEConTest | Rel-17 |
R5-96-e AI: 6.3.14.1 |
revised | [WTS] [JSN] |
R5-224400 | Addition of message contents for DedicatedSIBRequest |
CR revised to R5-225312 |
CATT | 38.508-1 17.5.0 CR#2463 catF | NR_pos-UEConTest | Rel-17 |
R5-96-e AI: 6.3.14.1 |
revised | [WTS] [JSN] |
R5-224401 | Correction of UE Rx-Tx time difference accuracy test cases | CR | CATT | 37.571-1 16.13.0 CR#381 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-224402 | Correction of NR RSTD test cases |
CR revised to R5-225740 |
CATT | 37.571-1 16.13.0 CR#382 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
revised | [WTS] [JSN] |
R5-224403 | Addition of new PRS RSRP measurement period test case 16.2.3 | CR | CATT | 37.571-1 16.13.0 CR#383 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-224404 | Addition of new PRS RSRP measurement period test case 16.2.4 | CR | CATT | 37.571-1 16.13.0 CR#384 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-224405 | Addition of new PRS RSRP measurement accuracy test case 16.3.2 |
CR revised to R5-225741 |
CATT | 37.571-1 16.13.0 CR#385 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
revised | [WTS] [JSN] |
R5-224406 | Removal of test case 7.5.2 | CR | CATT | 37.571-2 16.12.0 CR#162 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.5 |
agreed | [WTS] [JSN] |
R5-224407 | Correction of posSIB broadcasting test case | CR | CATT | 37.571-2 16.12.0 CR#163 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.5 |
agreed | [WTS] [JSN] |
R5-224408 | Addition of on-demand PosSIB followed by location information transfer in RRC_connected state |
CR revised to R5-225314 |
CATT | 37.571-2 16.12.0 CR#164 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.5 |
revised | [WTS] [JSN] |
R5-224409 | Addition of test applicabilities for on-demand posSIB test case | CR | CATT | 37.571-3 16.12.0 CR#156 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.6 |
agreed | [WTS] [JSN] |
R5-224410 | Addition of test applicabilities for PRS-RSRP FR2 test cases | CR | CATT | 37.571-3 16.12.0 CR#157 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.4 |
agreed | [WTS] [JSN] |
R5-224411 | Delete test applicabilities for posSIB broadcasting test case in LTE | CR | CATT | 37.571-3 16.12.0 CR#158 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.6 |
agreed | [WTS] [JSN] |
R5-224412 | Introduction of NR positioning test cases information | CR | CATT | 38.903 16.12.0 CR#338 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.6 |
agreed | [WTS] [JSN] |
R5-224413 | Correction of test cases 7.1.1.12.4 |
CR revised to R5-225297 |
CATT | 38.523-1 16.12.0 CR#3086 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 6.3.9.4 |
revised | [WTS] [JSN] |
R5-224414 | Addition of 7DL CA Sustained data rate performance test case 8.7.5.1.6 | CR | DEKRA | 36.521-1 17.3.0 CR#5413 catF | LTE_CA_R15-UEConTest | Rel-17 |
R5-96-e AI: 5.3.1.2 |
agreed | [WTS] [JSN] |
R5-224415 | Addition of 7DL CA Sustained data rate performance test case 8.7.5.2.6 | CR | DEKRA | 36.521-1 17.3.0 CR#5414 catF | LTE_CA_R15-UEConTest | Rel-17 |
R5-96-e AI: 5.3.1.2 |
agreed | [WTS] [JSN] |
R5-224416 | Update of applicability 7DL CA Sustained data rate performance test cases | CR | DEKRA | 36.521-2 16.13.0 CR#987 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.3 |
agreed | [WTS] [JSN] |
R5-224417 | Correction of test applicability for TC 7.1.1.12.4.x |
CR revised to R5-225298 |
CATT | 38.523-2 16.12.0 CR#243 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 6.3.9.5 |
revised | [WTS] [JSN] |
R5-224418 | Add UplinkDataCompression into PDCP-Config for NR UDC test |
CR revised to R5-225358 |
CATT | 38.508-1 17.5.0 CR#2464 catF | NR_UDC-UEConTest | Rel-17 |
R5-96-e AI: 6.3.35.1 |
revised | [WTS] [JSN] |
R5-224419 | Work plan: UE Conformance Test Aspects for NR Positioning Support | Work Plan | CATT | NR_pos-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224420 | SR UE Conformance Test Aspects - NR Positioning Support | WI status report | CATT | NR_pos-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224421 | Work plan: UE Conformance Test Aspects – UE power saving in NR | Work Plan | CATT | NR_UE_pow_sav-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224422 | SR UE Conformance Test Aspects - UE power saving in NR | WI status report | CATT | NR_UE_pow_sav-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224423 | Work plan: UE Conformance Test Aspects – NR Uplink Data Compression (UDC) | Work Plan | CATT | NR_UDC-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224424 | SR UE Conformance Test Aspects - NR Uplink Data Compression (UDC) | WI status report | CATT | NR_UDC-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224425 | Work plan: UE Conformance - NR sidelink enhancement | Work Plan | CATT | NR_SL_enh-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224426 | SR UE Conformance - NR sidelink enhancement | WI status report | CATT | NR_SL_enh-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224427 | Work plan: UE Conformance - NR Sidelink Relay | Work Plan | CATT | NR_SL_relay-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224428 | SR UE Conformance - NR Sidelink Relay | WI status report | CATT | NR_SL_relay-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224429 | Work plan: UE Conformance - NR Sidelink Relay | Work Plan | CATT | NR_SL_relay-UEConTest |
R5-96-e AI: 7.4.2 |
withdrawn | [WTS] [JSN] | ||
R5-224430 | Introduction of LTE Band 103 in spurious emission test cases in clause 6.6 |
CR revised to R5-225778 |
Puloli | 36.521-1 17.3.0 CR#5415 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.41.2 |
revised | [WTS] [JSN] |
R5-224431 | New WID Enhancement for the 5G Control Plane Steering of Roaming for UE in Connected mode |
WID new revised to R5-225254 |
NTT DOCOMO INC. | Rel-17 |
R5-96-e AI: 4.1 |
revised | [WTS] [JSN] | ||
R5-224432 | Proposal for new IMS test cases related to Unified Access Control |
discussion revised to R5-225264 |
NTT DOCOMO INC. | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
revised | [WTS] [JSN] | ||
R5-224433 | Addition of new test case 11.3.10 for access category 3 and 7 on Access identitiy 0 |
CR revised to R5-225262 |
NTT DOCOMO INC. | 38.523-1 16.12.0 CR#3087 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
revised | [WTS] [JSN] |
R5-224434 | Addition of new test case 11.3.11 for access category 3 and 7 and 9 on Access identitiy 0 |
CR revised to R5-225263 |
NTT DOCOMO INC. | 38.523-1 16.12.0 CR#3088 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
revised | [WTS] [JSN] |
R5-224435 | Addition of applicability for new testcase 11.3.10 | CR | NTT DOCOMO INC. | 38.523-2 16.12.0 CR#244 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
R5-224436 | Addition of applicability for new testcase 11.3.11 | CR | NTT DOCOMO INC. | 38.523-2 16.12.0 CR#245 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
R5-224437 | Addition of new CADC MOP TC | CR | Intertek | 38.521-3 17.5.0 CR#1412 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224438 | Addition of applicability for CADC MOP TC | CR | Intertek | 38.522 17.5.0 CR#200 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.7 |
agreed | [WTS] [JSN] |
R5-224439 | Applicability updates to NR EIEI test cases | CR | Qualcomm France | 38.523-2 16.12.0 CR#246 catF | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 6.3.16.4 |
agreed | [WTS] [JSN] |
R5-224440 | Addition of new NR EIEI test case 11.5.8 | CR | Qualcomm France | 38.523-1 16.12.0 CR#3089 catF | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 6.3.16.3 |
agreed | [WTS] [JSN] |
R5-224441 | Addition of NR EIEI test case 11.5.4 |
CR revised to R5-225320 |
Qualcomm France | 38.523-1 16.12.0 CR#3090 catF | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 6.3.16.3 |
revised | [WTS] [JSN] |
R5-224442 | Add new test case 11.8.5 Inter-system mobility between untrusted Non-3GPP and 3GPP system/Handover from 5GS to EPC/ePDG | CR | China Telecom | 38.523-1 16.12.0 CR#3091 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 6.4.4.11 |
withdrawn | [WTS] [JSN] |
R5-224443 | Add PICS for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system |
CR revised to R5-225370 |
China Telecom | 38.508-2 17.5.0 CR#367 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 6.4.2 |
revised | [WTS] [JSN] |
R5-224444 | Add applicability for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system | CR | China Telecom | 38.523-2 16.12.0 CR#247 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
R5-224445 | Addition of NR EIEI test case 11.5.12 | CR | Qualcomm France | 38.523-1 16.12.0 CR#3092 catF | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 6.3.16.3 |
agreed | [WTS] [JSN] |
R5-224446 | Update to NR EIEI test case 11.5.5 | CR | Qualcomm France | 38.523-1 16.12.0 CR#3093 catF | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 6.3.16.3 |
agreed | [WTS] [JSN] |
R5-224447 | Update to NR EIEI test cases 11.5.1, 11.5.2 | CR | Qualcomm France | 38.523-1 16.12.0 CR#3094 catF | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 6.3.16.3 |
agreed | [WTS] [JSN] |
R5-224448 | Update to SDAP test case 7.1.4.1 | CR | Qualcomm Incorporated, Keysight Technologies UK | 38.523-1 16.12.0 CR#3095 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.5 |
agreed | [WTS] [JSN] |
R5-224449 | Editorial update to test case 9.1.5.2.7 | CR | Qualcomm Incorporated, Rohde & Schwarz | 38.523-1 16.12.0 CR#3096 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.3 |
agreed | [WTS] [JSN] |
R5-224450 | Editorial update to UAC Test Case 11.3.1a | CR | Qualcomm France | 38.523-1 16.12.0 CR#3097 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
agreed | [WTS] [JSN] |
R5-224451 | Corrections to NB-IoT MAC test case 22.3.1.12 | CR | MCC TF160 | 36.523-1 17.2.0 CR#5111 catF | TEI15_Test, NB_IOTenh2-UEConTest | Rel-17 |
R5-96-e AI: 6.5.3.11 |
agreed | [WTS] [JSN] |
R5-224452 | Correction to NR DC test case 8.2.3.14.2 | CR | Qualcomm France | 38.523-1 16.12.0 CR#3098 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-224453 | Correction to PDCP test case 7.1.3.5.2 |
CR revised to R5-225379 |
Qualcomm France | 38.523-1 16.12.0 CR#3099 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.4 |
revised | [WTS] [JSN] |
R5-224454 | Correction to A.7.2 | CR | Qualcomm France | 34.229-1 16.2.0 CR#1504 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.1 |
withdrawn | [WTS] [JSN] |
R5-224455 | Editorial update to test case 11.3.6 | CR | Qualcomm France | 38.523-1 16.12.0 CR#3100 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
agreed | [WTS] [JSN] |
R5-224456 | Updates to NR MAC TC 7.1.1.3.9 | CR | MCC TF160 | 38.523-1 16.12.0 CR#3101 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-224457 | Addition of SNPN UAC Test Case | CR | Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#3102 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
withdrawn | [WTS] [JSN] |
R5-224458 | Alignment CSI-ResourcePeriodicityAndOffset to CSI-RS.3.2 TDD | CR | ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#2465 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-224459 | Correction derivation path Table 7.3.1-35 | CR | ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#2466 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-224460 | Correction to 7.3.1-12G | CR | ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#2467 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-224461 | Correction quantity config for inter-RAT to UTRA |
CR revised to R5-225780 |
ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#2468 catF | TEI16_Test, SRVCC_NR_to_UMTS-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
revised | [WTS] [JSN] |
R5-224462 | Definition of ZP-CSI-RS-ResourceSetId | CR | ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#2469 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-224463 | Correction PDSCH-ServingCellConfig with 38.533 Table C.1.3-2 for RRM | CR | ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#2470 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
withdrawn | [WTS] [JSN] |
R5-224464 | Correction 4.6.6-8B | CR | ROHDE & SCHWARZ | 36.508 17.2.0 CR#1394 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4. |
agreed | [WTS] [JSN] |
R5-224465 | Add event B1 for inter-RAT | CR | ROHDE & SCHWARZ | 36.508 17.2.0 CR#1395 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4. |
agreed | [WTS] [JSN] |
R5-224466 | Correction message contents 4.6.4.3 and 4.6.4.4 |
CR revised to R5-225816 |
ROHDE & SCHWARZ | 38.533 17.3.1 CR#1864 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
revised | [WTS] [JSN] |
R5-224467 | Corrections to 5.7.4.x | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1865 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
withdrawn | [WTS] [JSN] |
R5-224468 | Corrections to 5.6.1.3 and 5.6.1.4 | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1866 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-224469 | Corrections to 5.5.5.1 | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1867 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-224470 | Corrections to 5.5.5.2 | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1868 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-224471 | Corrections to 5.5.5.3 | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1869 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-224472 | Corrections for BFD LR test cases | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1870 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
agreed | [WTS] [JSN] |
R5-224473 | Correction message contents 6.6.4.3 and 6.6.4.4 |
CR revised to R5-225821 |
ROHDE & SCHWARZ | 38.533 17.3.1 CR#1871 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
revised | [WTS] [JSN] |
R5-224474 | Core spec alignment 6.7.x.1 test cases | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1872 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
agreed | [WTS] [JSN] |
R5-224475 | Corrections to 6.1.1.7 | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1873 catF | TEI16_Test, NR_HST-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
withdrawn | [WTS] [JSN] |
R5-224476 | Correction to CSI-RS.3.2 TDD | CR | ROHDE & SCHWARZ | 38.533 17.3.1 CR#1874 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
agreed | [WTS] [JSN] |
R5-224477 | Corrections to the GNSS scenarios |
CR revised to R5-225838 |
ROHDE & SCHWARZ | 37.571-5 16.8.0 CR#217 catF | TEI9_Test | Rel-16 |
R5-96-e AI: 5.6.11 |
revised | [WTS] [JSN] |
R5-224478 | Core spec alignment 9.6.3 | CR | ROHDE & SCHWARZ | 37.571-1 16.13.0 CR#386 catF | TEI14_Test | Rel-16 |
R5-96-e AI: 5.6.9 |
agreed | [WTS] [JSN] |
R5-224479 | Addition of Applicability for NPN test cases | CR | Qualcomm Finland RFFE Oy | 38.523-2 16.12.0 CR#248 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.4 |
agreed | [WTS] [JSN] |
R5-224480 | OTA environment limitations and test case status | discussion | ROHDE & SCHWARZ |
R5-96-e AI: 6.4.7 |
noted | [WTS] [JSN] | |||
R5-224481 | Correction to idle mode test cases (applicable only for FR1 bands) |
CR revised to R5-225372 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3103 catF | 5GS_NR_LTE-UEConTest, TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.4.2 |
revised | [WTS] [JSN] |
R5-224482 | Correction to 5GS Test case 11.3.4 | CR | ANRITSU LTD | 38.523-1 16.12.0 CR#3104 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
agreed | [WTS] [JSN] |
R5-224483 | Correction to RRC Connection Management test cases (applicable only for FR1 bands) |
CR revised to R5-225380 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3105 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.1 |
revised | [WTS] [JSN] |
R5-224484 | Correction to RRC Measurement test cases (applicable only for FR1 bands) |
CR revised to R5-225383 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3106 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.3 |
revised | [WTS] [JSN] |
R5-224485 | Update of test case 8.1.6.4.1 | CR | MediaTek Inc, Rohde & Schwarz., Anritsu Ltd | 38.523-1 16.12.0 CR#3107 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-224486 | Correction to ENDC Measurement test cases (applicable only for FR1 bands) |
CR revised to R5-225403 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3108 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224487 | Correction of Default Configuration Parameters for Test 1 in Test Case 7.1.11 |
CR revised to R5-225837 |
STMicroelectronics | 36.521-3 16.13.0 CR#2647 catF | TEI13_Test | Rel-16 |
R5-96-e AI: 5.5.1.5 |
revised | [WTS] [JSN] |
R5-224488 | Correction of Default Configuration Parameters for Test 1 in Test Case 7.1.11 | CR | STMicroelectronics | 36.521-3 15.6.0 CR#2648 catA | TEI13_Test | Rel-15 |
R5-96-e AI: 5.5.1.5 |
withdrawn | [WTS] [JSN] |
R5-224489 | Correction of Default Configuration Parameters for Test 1 in Test Case 7.1.11 | CR | STMicroelectronics | 36.521-3 14.5.0 CR#2649 catA | TEI13_Test | Rel-14 |
R5-96-e AI: 5.5.1.5 |
withdrawn | [WTS] [JSN] |
R5-224490 | Correction of Default Configuration Parameters for Test 1 in Test Case 7.1.11 | CR | STMicroelectronics | 36.521-3 13.2.0 CR#2650 catA | TEI13_Test | Rel-13 |
R5-96-e AI: 5.5.1.5 |
withdrawn | [WTS] [JSN] |
R5-224491 | Updates to Radiated Static Channel Tests A.6.1.1 and A.8.1.1 |
CR revised to R5-225839 |
Qualcomm Technologies Int | 37.901-5 16.8.0 CR#30 catF | TEI15_Test, FS_UE_5GNR_App_Data_Perf | Rel-16 |
R5-96-e AI: 5.6.17 |
revised | [WTS] [JSN] |
R5-224492 | PRD21 CDS: CA_n2A-n77A, CA_n5A-n77A | other | Verizon Switzerland AG |
R5-96-e AI: 7.3.4 |
withdrawn | [WTS] [JSN] | |||
R5-224493 | PRD21 CDS: DC_2A_n77A, DC_5A_n77A, DC_13A_n77A, DC_66A_n77A | other | Verizon Switzerland AG |
R5-96-e AI: 7.3.4 |
withdrawn | [WTS] [JSN] | |||
R5-224494 | PRD21 CDS: PC2 of n77, DC_2A_n77A, DC_5A_n77A, DC_13A_n77A, DC_66A_n77A | other | Verizon Switzerland AG |
R5-96-e AI: 7.3.4 |
available | [WTS] [JSN] | |||
R5-224495 | Editorial Changes to 37.901-5 | CR | Qualcomm Technologies Int | 37.901-5 16.8.0 CR#31 catF | TEI15_Test, FS_UE_5GNR_App_Data_Perf | Rel-16 |
R5-96-e AI: 5.6.17 |
agreed | [WTS] [JSN] |
R5-224496 | New WID on Conformance Test Aspects - Protocol enhancements for Mission Critical Services for Rel-16 |
WID new revised to R5-225255 |
NIST | Rel-16 |
R5-96-e AI: 4.1 |
revised | [WTS] [JSN] | ||
R5-224497 | Test Tolerances for FR2 SRS-RSRP measurement in non-DRX | CR | Qualcomm Technologies Int | 38.903 16.12.0 CR#339 catF | NR_CLI-UEConTest | Rel-16 |
R5-96-e AI: 5.3.10.5 |
withdrawn | [WTS] [JSN] |
R5-224498 | EN-DC FR2 SRS-RSRP measurement accuracy | CR | Qualcomm Technologies Int | 38.903 16.12.0 CR#340 catF | NR_CLI-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
withdrawn | [WTS] [JSN] |
R5-224499 | Updates to CLI Measurement test case 5.6.4.1, 5.7.5.1, 7.6.4.1 and 7.7.5.1 |
CR revised to R5-225655 |
Qualcomm Technologies Int | 38.533 17.3.1 CR#1875 catF | NR_CLI-UEConTest | Rel-17 |
R5-96-e AI: 5.3.10.4 |
revised | [WTS] [JSN] |
R5-224500 | Correction to Mob_enh RRM TCs 6.3.1.X - FR1 DAPS HO |
CR revised to R5-225876 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1876 catF | NR_Mob_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.6.4 |
revised | [WTS] [JSN] |
R5-224501 | Correction to Mob_enh RRM TCs 7.3.1.X - FR2 DAPS HO | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1877 catF | NR_Mob_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.6.4 |
agreed | [WTS] [JSN] |
R5-224502 | Re-orginzation of NR SL Demod test cases | CR | Huawei, HiSilicon | 38.521-4 16.12.0 CR#556 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7.6.1 |
agreed | [WTS] [JSN] |
R5-224503 | Correction to Annex F for NR SL Demod TCs | CR | Huawei, HiSilicon | 38.521-4 16.12.0 CR#557 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7.6.2 |
agreed | [WTS] [JSN] |
R5-224504 | Correction to applicability of NR SL Demod TCs | CR | Huawei, HiSilicon | 38.522 17.5.0 CR#201 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.7 |
agreed | [WTS] [JSN] |
R5-224505 | Correction to minimum requirements in 9.1.1.0 - SL Tx timing error | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1878 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224506 | Correction to NR SL RRM TC 9.1.1.1 - GNSS with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1879 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224507 | Correction to NR SL RRM TC 9.1.1.2 - SyncRef UE with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1880 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224508 | Correction to NR SL RRM TC 9.1.1.3 - gNB with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1881 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224509 | Correction to NR SL RRM TC 9.1.2.1 - S-SSB Tx gNB with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1882 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224510 | Correction to NR SL RRM TC 9.1.2.2 - S-SSB Tx SyncRef UE with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1883 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224511 | Correction to minimum requirements in 9.1.3.0 - SyncRef reselection | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1884 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224512 | Correction to NR SL RRM TC 9.1.3.1 - GNSS highest priority with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1885 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224513 | Correction to NR SL RRM TC 9.1.3.2 - Cell highest priority with TT |
CR revised to R5-225851 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1886 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
revised | [WTS] [JSN] |
R5-224514 | Correction to NR SL RRM TC 9.1.4.1 - resource selection with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1887 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224515 | Correction to NR SL RRM TC 9.1.4.2 - resource pre-emption with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1888 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224516 | Correction to NR SL RRM TC 9.1.4.3 - resource re-evaluation with TT |
CR revised to R5-225852 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1889 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
revised | [WTS] [JSN] |
R5-224517 | Correction to NR SL RRM TC 9.1.5.1 - CBR concurrent with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1890 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224518 | Correction to NR SL RRM TC 9.1.5.2 - CBR PC5 only with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1891 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224519 | Correction to NR SL RRM TC 9.1.6.1 - WAN interruption with TT | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1892 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-224520 | Correction to Annex F for NR SL RRM TCs |
CR revised to R5-225853 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1893 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
revised | [WTS] [JSN] |
R5-224521 | TT analysis for NR SL RRM TC 9.1.1.1 - GNSS | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#341 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224522 | TT analysis for NR SL RRM TC 9.1.1.2 - SyncRef UE | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#342 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224523 | TT analysis for NR SL RRM TC 9.1.1.3 - gNB | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#343 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224524 | TT analysis for NR SL RRM TC 9.1.2.1 - S-SSB Tx gNB | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#344 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224525 | TT analysis for NR SL RRM TC 9.1.2.2 - S-SSB Tx SyncRef UE | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#345 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224526 | TT analysis for NR SL RRM TC 9.1.3.1 - GNSS highest priority | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#346 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224527 | TT analysis for NR SL RRM TC 9.1.3.2 - Cell highest priority | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#347 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224528 | TT analysis for NR SL RRM TC 9.1.4.1 - resource selection | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#348 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224529 | TT analysis for NR SL RRM TC 9.1.4.2 - resource pre-emption | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#349 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224530 | TT analysis for NR SL RRM TC 9.1.4.3 - resource re-evaluation |
CR revised to R5-225854 |
Huawei, HiSilicon | 38.903 16.12.0 CR#350 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
revised | [WTS] [JSN] |
R5-224531 | TT analysis for NR SL RRM TC 9.1.5.x - CBR | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#351 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224532 | TT analysis for NR SL RRM TC 9.1.6.1 - WAN interruption | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#352 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-224533 | Correction to NR PS RRM TC 7.1.1.3 - intra-freq reselection low mobility with TT |
CR revised to R5-225855 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1894 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
revised | [WTS] [JSN] |
R5-224534 | Correction to NR PS RRM TC 7.1.1.4 - intra-freq reselection not-at-cell-edge with TT |
CR revised to R5-225856 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1895 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
revised | [WTS] [JSN] |
R5-224535 | Correction to NR PS RRM TC 7.1.1.5 - inter-freq reselection low mobility with TT |
CR revised to R5-225857 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1896 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
revised | [WTS] [JSN] |
R5-224536 | Correction to NR PS RRM TC 7.1.1.6 - inter-freq reselection not-at-cell-edge with TT |
CR revised to R5-225858 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1897 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
revised | [WTS] [JSN] |
R5-224537 | Correction to Annex F for NR PS RRM TCs |
CR revised to R5-225859 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1898 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
revised | [WTS] [JSN] |
R5-224538 | TT analysis for NR PS RRM TC 7.1.1.3 - intra-freq reselection low mobility |
CR revised to R5-225860 |
Huawei, HiSilicon | 38.903 16.12.0 CR#353 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.6 |
revised | [WTS] [JSN] |
R5-224539 | TT analysis for NR PS RRM TC 7.1.1.4 - intra-freq reselection not-at-cell-edge |
CR revised to R5-225861 |
Huawei, HiSilicon | 38.903 16.12.0 CR#354 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.6 |
revised | [WTS] [JSN] |
R5-224540 | TT analysis for NR PS RRM TC 7.1.1.5 - inter-freq reselection low mobility |
CR revised to R5-225862 |
Huawei, HiSilicon | 38.903 16.12.0 CR#355 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.6 |
revised | [WTS] [JSN] |
R5-224541 | TT analysis for NR PS RRM TC 7.1.1.6 - inter-freq reselection not-at-cell-edge |
CR revised to R5-225863 |
Huawei, HiSilicon | 38.903 16.12.0 CR#356 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.6 |
revised | [WTS] [JSN] |
R5-224542 | Correction to EN-DC FR1 RRM TC 4.5.2.X - interruption |
CR revised to R5-225884 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1899 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
revised | [WTS] [JSN] |
R5-224543 | Correction to EN-DC FR1 RRM TC 4.5.3.X - SCell activation |
CR revised to R5-225885 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1900 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
revised | [WTS] [JSN] |
R5-224544 | Correction to EN-DC FR1 RRM TC 4.5.6.1.2 - BWP switching |
CR revised to R5-225886 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1901 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
revised | [WTS] [JSN] |
R5-224545 | Correction to EN-DC FR1 RRM TC 4.6.4.3 - L1-RSRP non-DRX | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1902 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
withdrawn | [WTS] [JSN] |
R5-224546 | Correction to NR HST RRM TC 6.1.1.7 - intra-freq reselection | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1903 catF | TEI16_Test, NR_HST-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
agreed | [WTS] [JSN] |
R5-224547 | Correction to NR SA FR1 RRM TC 6.5.2.1 - interruption |
CR revised to R5-225887 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1904 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
revised | [WTS] [JSN] |
R5-224548 | Correction to NR SA FR1 RRM TC 6.5.3.X - SCell activation |
CR revised to R5-225888 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1905 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
revised | [WTS] [JSN] |
R5-224549 | Correction to NR SA FR1 RRM TC 6.5.6.1.1 - BWP switching |
CR revised to R5-225889 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1906 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
revised | [WTS] [JSN] |
R5-224550 | Correction to NR SA FR1 RRM TC 6.6.4.3 - L1-RSRP non-DRX | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1907 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
withdrawn | [WTS] [JSN] |
R5-224551 | Correction to NR SA FR2 RRM TC 7.1.1.1 - intra-freq reselection with TT |
CR revised to R5-225864 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1908 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
revised | [WTS] [JSN] |
R5-224552 | Correction to NR SA FR2 RRM TC 7.1.1.2 - inter-freq reselection with TT |
CR revised to R5-225865 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1909 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
revised | [WTS] [JSN] |
R5-224553 | Correction to NR HST RRM TC 8.2.1.2 - intra-RAT reselection | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1910 catF | TEI16_Test, NR_HST-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.6 |
agreed | [WTS] [JSN] |
R5-224554 | TT analysis for NR SA FR2 RRM TC 7.1.1.1 - intra-freq reselection |
CR revised to R5-225867 |
Huawei, HiSilicon | 38.903 16.12.0 CR#357 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-224555 | TT analysis for NR SA FR2 RRM TC 7.1.1.2 - inter-freq reselection |
CR revised to R5-225868 |
Huawei, HiSilicon | 38.903 16.12.0 CR#358 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-224556 | Correction of NR SL message contents |
CR revised to R5-225290 |
Huawei, HiSilicon | 38.508-1 17.5.0 CR#2471 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 6.3.7.1 |
revised | [WTS] [JSN] |
R5-224557 | Correction of test procedure 4.9.31 - Connectivity check |
CR revised to R5-225291 |
Huawei, HiSilicon | 38.508-1 17.5.0 CR#2472 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 6.3.7.1 |
revised | [WTS] [JSN] |
R5-224558 | Correction of NR SA SIG TC 8.1.5.1.1 - NR SL capabilities | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3109 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
withdrawn | [WTS] [JSN] |
R5-224559 | Addition of NR SL SIG TC 12.1.2.1 - PC5 only SyncRef reeselection | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3110 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224560 | Addition of NR SL SIG TC 12.1.2.2 - PC5 only S-SSB Tx | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3111 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224561 | Addition of NR SL SIG TC 12.2.2.1 - Concurrent SyncRef reeselection | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3112 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224562 | Addition of NR SL SIG TC 12.2.2.2 - Concurrent S-SSB Tx | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3113 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224563 | Correction to NR SL SIG TC 12.2.3.1 - Concurrent Event C1 and C2 | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3114 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224564 | Addition of NR SL SIG TC 12.2.5.1 - Concurrent SL-RSRP Config | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3115 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224565 | Addition of NR SL SIG TC 12.2.5.2 - Concurrent Event S1 and S2 | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3116 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224566 | Addition of NR SL SIG TC 12.2.7.2 - Concurrent SL CSI reporting |
CR revised to R5-225448 |
Huawei, HiSilicon | 38.523-1 16.12.0 CR#3117 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
revised | [WTS] [JSN] |
R5-224567 | Addition of NR SL SIG TC 12.2.8.1 - Concurrent Reconfig failure | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3118 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224568 | Addition of NR SL SIG TC 12.2.8.3 - Concurrent SL radio link failure | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3119 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224569 | Addition of applicability for NR SL SIG TCs |
CR revised to R5-225296 |
Huawei, HiSilicon | 38.523-2 16.12.0 CR#249 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.5 |
revised | [WTS] [JSN] |
R5-224570 | Correction to NR TC 6.1.2.11 - Area Specific SIBs |
CR revised to R5-225373 |
Huawei, HiSilicon | 38.523-1 16.12.0 CR#3120 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
revised | [WTS] [JSN] |
R5-224571 | Correction to NR TC 6.4.1.1- Automatic PLMN Selection | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3121 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
agreed | [WTS] [JSN] |
R5-224572 | Correction to NR TC 6.4.1.2- ePLMN manual selection | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3122 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
agreed | [WTS] [JSN] |
R5-224573 | Correction to NR TC 6.4.2.1- Cell Reselection | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3123 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
agreed | [WTS] [JSN] |
R5-224574 | Correction to NR TC 6.4.2.2- Cell Reselection SIB priority | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3124 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
agreed | [WTS] [JSN] |
R5-224575 | Correction to NR TC 8.1.3.1.12 - SINR A5 | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3125 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.3 |
agreed | [WTS] [JSN] |
R5-224576 | Addition of NR-DC TC 8.2.2.2.2 - Split SRB | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3126 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
withdrawn | [WTS] [JSN] |
R5-224577 | Correction to NE-DC TC 8.2.2.5.3 - Split DRB | CR | Huawei, HiSilicon | 38.523-1 16.12.0 CR#3127 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-224578 | Addition of applicability for NR-DC TCs | CR | Huawei, HiSilicon | 38.523-2 16.12.0 CR#250 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
R5-224579 | Update of TC 13.2.5- PC5 unicast / link identifier update |
CR revised to R5-225292 |
TDIA, CATT | 38.523-1 16.12.0 CR#3128 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
revised | [WTS] [JSN] |
R5-224580 | Update of TC 12.2.3.2- Inter-carrier concurrent operation / Measurement configuration and reporting via Uu RRC / CBR measurement reporting / Periodical reporting |
CR revised to R5-225293 |
TDIA, CATT | 38.523-1 16.12.0 CR#3129 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
revised | [WTS] [JSN] |
R5-224581 | Update of TC 12.2.1.2- Inter-carrier concurrent operation / Sidelink communication / RRC_IDLE / Reception | CR | TDIA, CATT | 38.523-1 16.12.0 CR#3130 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224582 | Update of TC 12.1.3.2- PC5-only operation / Measurement configuration and reporting via PC5 RRC / PSBCH-RSRP measurement reporting / Event S1 and S2 | CR | TDIA, CATT | 38.523-1 16.12.0 CR#3131 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-224583 | Add new test case 11.8.6 Handover from EPC/ePDG to 5GS for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system | CR | China Telecom | 38.523-1 16.12.0 CR#3132 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 6.5.3.8 |
withdrawn | [WTS] [JSN] |
R5-224584 | Addition of new test case 10.1.8.1- NASC / PDU session establishment reject / Maximum number of PDU sessions reached / Back-off timer is neither zero nor deactivated |
CR revised to R5-225335 |
TDIA, CATT | 38.523-1 16.12.0 CR#3133 catF | eNS_Ph2-UEConTest | Rel-16 |
R5-96-e AI: 6.3.24.3 |
revised | [WTS] [JSN] |
R5-224585 | Add new test case 11.8.6 Handover from EPC/ePDG to 5GS for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system | CR | China Telecom | 38.523-1 16.12.0 CR#3134 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 6.4.4.11 |
withdrawn | [WTS] [JSN] |
R5-224586 | Addition of new test case 10.1.8.2- NASC / PDU session establishment reject / Maximum number of PDU sessions reached / Back-off timer is deactivated |
CR revised to R5-225336 |
TDIA, CATT | 38.523-1 16.12.0 CR#3135 catF | eNS_Ph2-UEConTest | Rel-16 |
R5-96-e AI: 6.3.24.3 |
revised | [WTS] [JSN] |
R5-224587 | Addition of new test case 10.1.8.3-NASC / PDU session establishment reject / Maximum number of PDU sessions reached / Back-off timer is zero or not included |
CR revised to R5-225337 |
TDIA, CATT | 38.523-1 16.12.0 CR#3136 catF | eNS_Ph2-UEConTest | Rel-16 |
R5-96-e AI: 6.3.24.3 |
revised | [WTS] [JSN] |
R5-224588 | Addition of new eNS Ph2 test case 9.1.12.1 |
CR revised to R5-225338 |
CMCC | 38.523-1 16.12.0 CR#3137 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.3 |
revised | [WTS] [JSN] |
R5-224589 | Addition of new eNS Ph2 test case 9.1.12.2 |
CR revised to R5-225339 |
CMCC | 38.523-1 16.12.0 CR#3138 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.3 |
revised | [WTS] [JSN] |
R5-224590 | Addition of applicability of new eNS Ph2 test cases | CR | CMCC, CATT | 38.523-2 16.12.0 CR#251 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.4 |
agreed | [WTS] [JSN] |
R5-224591 | Addition of SIB16 for slice based cell reselection |
CR revised to R5-225356 |
CMCC | 38.508-1 17.5.0 CR#2473 catF | NR_slice-UEConTest | Rel-17 |
R5-96-e AI: 6.3.29.1 |
revised | [WTS] [JSN] |
R5-224592 | Updates to message contents for slice specific RACH configuration |
CR revised to R5-225357 |
CMCC, Anritsu, Ericsson | 38.508-1 17.5.0 CR#2474 catF | NR_slice-UEConTest | Rel-17 |
R5-96-e AI: 6.3.29.1 |
revised | [WTS] [JSN] |
R5-224593 | Addition of UE capability for slice based cell reselection | CR | CMCC | 38.508-2 17.5.0 CR#368 catF | NR_slice-UEConTest | Rel-17 |
R5-96-e AI: 6.3.29.2 |
agreed | [WTS] [JSN] |
R5-224594 | Revised WID - UE Conformance - enhancement of RAN slicing for NR plus CT1 aspects | WID revised | CMCC | NR_slice-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
R5-224595 | Addition of new NE-DC test case 8.2.3.4.2 |
CR revised to R5-225404 |
CMCC | 38.523-1 16.12.0 CR#3139 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224596 | Addition of new NE-DC test case 8.2.3.5.2 |
CR revised to R5-225405 |
CMCC | 38.523-1 16.12.0 CR#3140 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
revised | [WTS] [JSN] |
R5-224597 | Addition of new NE-DC test case 8.2.3.12.2 | CR | CMCC | 38.523-1 16.12.0 CR#3141 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-224598 | Update of NE-DC test case 8.2.3.6.2 | CR | CMCC | 38.523-1 16.12.0 CR#3142 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-224599 | Update of test case 8.2.3.4.1 | CR | CMCC | 38.523-1 16.12.0 CR#3143 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-224600 | Addition of applicability of NE-DC RRC test cases |
CR revised to R5-225415 |
CMCC | 38.523-2 16.12.0 CR#252 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
revised | [WTS] [JSN] |
R5-224601 | Update of MDT message and information element |
CR revised to R5-225333 |
CMCC | 38.508-1 17.5.0 CR#2475 catF | NR_ENDC_SON_MDT_enh-UEConTest | Rel-17 |
R5-96-e AI: 6.3.23.1 |
revised | [WTS] [JSN] |
R5-224602 | SR - Rel-17 eNS_Ph2-UEConTest after RAN5#96-e | WI status report | CMCC, CATT | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224603 | WP - Rel-17 eNS_Ph2-UEConTest after RAN5#96-e | Work Plan | CMCC, CATT | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224604 | SR - Rel-17 NR_ENDC_SON_MDT_enh-UEConTest after RAN5#96-e | WI status report | CMCC | NR_ENDC_SON_MDT_enh-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224605 | WP - Rel-17 NR_ENDC_SON_MDT_enh-UEConTest after RAN5#96-e | Work Plan | CMCC | NR_ENDC_SON_MDT_enh-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224606 | SR - Rel-17 NR_slice-UEConTest after RAN5#96-e | WI status report | CMCC | NR_slice-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224607 | WP - Rel-17 NR_slice-UEConTest after RAN5#96-e | Work Plan | CMCC | NR_slice-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224608 | Corrections to NB-IoT MAC test case 22.3.1.11 | CR | MCC TF160 | 36.523-1 17.2.0 CR#5112 catF | TEI15_Test, NB_IOTenh2-UEConTest | Rel-17 |
R5-96-e AI: 6.5.3.11 |
agreed | [WTS] [JSN] |
R5-224609 | Correction to Annex F for NR RRM TCs |
CR revised to R5-225866 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1911 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
revised | [WTS] [JSN] |
R5-224610 | MU discussion on FR2 PC1 |
discussion revised to R5-225639 |
Anritsu, NTT DOCOMO INC. | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-224611 | Definition of PC1 MU and relaxation |
CR revised to R5-225667 |
Anritsu | 38.521-2 16.12.0 CR#780 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
revised | [WTS] [JSN] |
R5-224612 | Definition of PC1 MU |
CR revised to R5-225674 |
Anritsu | 38.903 16.12.0 CR#359 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-224613 | MU discussion on 40 cm Quiet Zone | discussion | Anritsu | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-224614 | Update FR2 TRx MU in 38.521-2 | CR | Anritsu | 38.521-2 16.12.0 CR#781 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
withdrawn | [WTS] [JSN] |
R5-224615 | Update FR2 TRx MU in 38.903 |
CR revised to R5-225675 |
Anritsu | 38.903 16.12.0 CR#360 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-224616 | PRD21 CDS PC3 for CA_n77C and CA_n77C BCS1 | other | Anritsu | NR_CADC_NR_LTE_DC_R16-UEConTest |
R5-96-e AI: 7.3.4 |
available | [WTS] [JSN] | ||
R5-224617 | Addition of test requirement for CA_n77C in 7.3A.1 | CR | Anritsu | 38.521-1 17.5.0 CR#1808 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.2 |
agreed | [WTS] [JSN] |
R5-224618 | Correction to EVM measurement point for DFTs-OFDM DM-RS Type 2 |
CR revised to R5-225869 |
Anritsu | 38.521-1 17.5.0 CR#1809 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.3.3 |
revised | [WTS] [JSN] |
R5-224619 | Correction to EVM measurement point for DFTs-OFDM DM-RS Type 2 |
CR revised to R5-225870 |
Anritsu | 38.521-2 16.12.0 CR#782 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.4.3 |
revised | [WTS] [JSN] |
R5-224620 | Correction to connection diagram of spurious emissions |
CR revised to R5-225619 |
Anritsu | 38.521-2 16.12.0 CR#783 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-224621 | Correction to test procedure of minimum output power |
CR revised to R5-225845 |
Anritsu | 38.521-2 16.12.0 CR#784 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-224622 | Addition of test requirement for E-UTRA cell of PC2 UE in 6.2B.4.1 | CR | Anritsu | 38.521-3 17.5.0 CR#1413 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-224623 | Correction to lower limit for NS_56 in 6.2.4 | CR | Anritsu | 36.521-1 17.3.0 CR#5416 catF | TEI17_Test, LTE_B24_mod-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.3.1 |
agreed | [WTS] [JSN] |
R5-224624 | Correction to RB allocation for NS_03 NS_07 in UL CA test cases | CR | Anritsu | 36.521-1 17.3.0 CR#5417 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest, LTE_UL_CAP_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.3.1 |
agreed | [WTS] [JSN] |
R5-224625 | Addition of test frequencies for DC_21A_n28A |
CR revised to R5-225730 |
Anritsu, NTT DOCOMO INC., Ericsson | 38.508-1 17.5.0 CR#2476 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.1.1 |
revised | [WTS] [JSN] |
R5-224626 | Correction to test frequency definition for DC combination including n28 | CR | Anritsu | 38.521-3 17.5.0 CR#1414 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.5.3 |
agreed | [WTS] [JSN] |
R5-224627 | Correction to CA configuration in 7.4A.2 |
CR revised to R5-225723 |
Anritsu | 38.521-1 17.5.0 CR#1810 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.2 |
revised | [WTS] [JSN] |
R5-224628 | Correction to interference values in Rx test cases | CR | Anritsu | 38.521-1 17.5.0 CR#1811 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.2 |
agreed | [WTS] [JSN] |
R5-224629 | Correction to E-UTRA output power in intra-band contiguous EN-DC Rx test cases | CR | Anritsu | 38.521-3 17.5.0 CR#1415 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.2 |
agreed | [WTS] [JSN] |
R5-224630 | Correction to interfere offset in 7.6.2 |
CR revised to R5-225797 |
Anritsu | 38.521-2 16.12.0 CR#785 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.2 |
revised | [WTS] [JSN] |
R5-224631 | Correction to connection diagram for DL CA Demodulation and CSI test cases |
CR revised to R5-225781 |
Anritsu | 38.508-1 17.5.0 CR#2477 catF | TEI16_Test, NR_perf_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
revised | [WTS] [JSN] |
R5-224632 | Core alignment and editorial corrections for FR1 CSI CA test cases |
CR revised to R5-225809 |
Anritsu | 38.521-4 16.12.0 CR#558 catF | TEI16_Test, NR_perf_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
revised | [WTS] [JSN] |
R5-224633 | Core alignment and editorial corrections for FR1 Demodulation CA test cases | CR | Anritsu | 38.521-4 16.12.0 CR#559 catF | TEI16_Test, NR_perf_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-224634 | Correction to applicability of C097 | CR | Anritsu | 38.522 17.5.0 CR#202 catF | TEI16_Test, NR_HST-UEConTest | Rel-17 |
R5-96-e AI: 5.4.8 |
agreed | [WTS] [JSN] |
R5-224635 | Correction to condition DRX.7 in H.3.7 | CR | Anritsu | 38.533 17.3.1 CR#1912 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
agreed | [WTS] [JSN] |
R5-224636 | Correction to test parameters in 6.1.1.7 | CR | Anritsu | 38.533 17.3.1 CR#1913 catF | TEI16_Test, NR_HST-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
withdrawn | [WTS] [JSN] |
R5-224637 | Correction to test requirement for SFTD measurement accuracy | CR | Anritsu | 38.533 17.3.1 CR#1914 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
agreed | [WTS] [JSN] |
R5-224638 | Clarification to Antenna ports of DCI format 1_1 for RF TCs | CR | Anritsu | 38.508-1 17.5.0 CR#2478 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-224639 | Correction to CSI-MeasConfig for RRM | CR | Anritsu | 38.508-1 17.5.0 CR#2479 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-224640 | Correction to RadioBearerConfig for handover | CR | Anritsu | 38.508-1 17.5.0 CR#2480 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
withdrawn | [WTS] [JSN] |
R5-224641 | Correction to RRC message for uplink CA |
CR revised to R5-225782 |
Anritsu | 38.508-1 17.5.0 CR#2481 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
revised | [WTS] [JSN] |
R5-224642 | Correction to CQI-RI-PMI delay in 6.2A.3.1 | CR | Anritsu | 38.521-4 16.12.0 CR#560 catF | TEI16_Test, NR_perf_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-224643 | Correction to DCI bit size in 5.2.2.2.4_1 | CR | Anritsu | 38.521-4 16.12.0 CR#561 catF | TEI16_Test, NR_perf_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-224644 | Correction to message exception in 5.2.3.2.10_1 | CR | Anritsu | 38.521-4 16.12.0 CR#562 catF | TEI16_Test, NR_HST-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-224645 | Correction to measurement delay in 4.6.4.5 | CR | Anritsu | 38.533 17.3.1 CR#1915 catF | TEI16_Test, NR_HST-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
agreed | [WTS] [JSN] |
R5-224646 | Correction to RMSI CORESET Reference Measurement Channels in A.1.2 | CR | Anritsu | 38.533 17.3.1 CR#1916 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
agreed | [WTS] [JSN] |
R5-224647 | Correction to SS-SINR condition in 5.7.3.x | CR | Anritsu | 38.533 17.3.1 CR#1917 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-224648 | Correction to Starting PRB index for ULBWP.1.3 in A.8.2 | CR | Anritsu | 38.533 17.3.1 CR#1918 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
agreed | [WTS] [JSN] |
R5-224649 | Correction to test parameters in 5.6.3.x |
CR revised to R5-225871 |
Anritsu | 38.533 17.3.1 CR#1919 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
revised | [WTS] [JSN] |
R5-224650 | Correction to test procedure in 5.7.4.x | CR | Anritsu | 38.533 17.3.1 CR#1920 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
withdrawn | [WTS] [JSN] |
R5-224651 | Update of AMPR NS_04 for intra band non contiguous EN-DC test case | CR | Ericsson | 38.521-3 17.5.0 CR#1416 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
withdrawn | [WTS] [JSN] |
R5-224652 | Update of test point analysis for AMPR intra band non contiguous EN DC test case | CR | Ericsson | 38.905 17.5.0 CR#639 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
withdrawn | [WTS] [JSN] |
R5-224653 | Correction of reference to test configuration table for intra band contiguous EN-DC test case | CR | Ericsson | 38.521-3 17.5.0 CR#1417 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-224654 | Correction to NR5GC RRC test case 8.2.2.1.1 |
CR revised to R5-225282 |
Starpoint | 38.523-1 16.12.0 CR#3144 catF | 5GS_NR_LTE-UEConTest, TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
revised | [WTS] [JSN] |
R5-224655 | Addition of missing message exceptions for CQI tests | CR | Rohde & Schwarz | 38.521-4 16.12.0 CR#563 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-224656 | Addition of missing RMC for PDCCH tests |
CR revised to R5-225813 |
Rohde & Schwarz | 38.521-4 16.12.0 CR#564 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.4 |
revised | [WTS] [JSN] |
R5-224657 | Update of FR2 PDCCH TCs | CR | Rohde & Schwarz | 38.521-4 16.12.0 CR#565 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-224658 | Add IE GapPriority | CR | Ericsson | 38.508-1 17.5.0 CR#2482 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224659 | Updates to test procedures 4.9.12A and 4.9.12B |
CR revised to R5-225362 |
MCC TF160, Huawei, Hisilicon | 38.508-1 17.5.0 CR#2483 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
revised | [WTS] [JSN] |
R5-224660 | On the implementation complexity of some IMS emergency over 5G test cases | discussion | MCC TF160 |
R5-96-e AI: 6.6.6.6 |
noted | [WTS] [JSN] | |||
R5-224661 | Correction to NR5GC MAC test case 7.1.1.3.2b |
CR revised to R5-225289 |
Starpoint | 38.523-1 16.12.0 CR#3145 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
revised | [WTS] [JSN] |
R5-224662 | Add IE HysteresisLocation | CR | Ericsson | 38.508-1 17.5.0 CR#2484 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224663 | Correction to NR IMS TC 7.22 and 7.23 - add and remove video | CR | Huawei, Hisilicon | 34.229-5 16.3.0 CR#436 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
withdrawn | [WTS] [JSN] |
R5-224664 | Correction to NR IMS TC 6.1-Initial Registration |
CR revised to R5-225428 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#437 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224665 | Correction to NR IMS TC 6.2-Initial Registration Failures |
CR revised to R5-225429 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#438 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224666 | Correction to NR IMS TC 6.3-Re-Registration Scenarios |
CR revised to R5-225430 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#439 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224667 | Correction to NR IMS TC 6.4-De-Registration Scenarios |
CR revised to R5-225431 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#440 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224668 | Correction to NR IMS TC 10.12-User-initiated emergency reregistration and UE has emergency related ongoing dialog | CR | Huawei, Hisilicon | 34.229-5 16.3.0 CR#441 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
withdrawn | [WTS] [JSN] |
R5-224669 | Correction to NR IMS TC 10.13-User-initiated emergency reregistration and User initiates an emergency call | CR | Huawei, Hisilicon | 34.229-5 16.3.0 CR#442 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
withdrawn | [WTS] [JSN] |
R5-224670 | Correction to NR IMS TC 6.6-Re-Registration after capability update | CR | Huawei, Hisilicon | 34.229-5 16.3.0 CR#443 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-224671 | Correction to NR IMS TC 6.7-Authentication with MAC Parameter Invalid |
CR revised to R5-225432 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#444 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224672 | Correction to NR IMS TC 6.8-Authentication with SQN out of range |
CR revised to R5-225433 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#445 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224673 | Correction to NR IMS TC 6.9-Subscription with 503 Service Unavailable |
CR revised to R5-225434 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#446 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224674 | Correction to NR IMS TC 8.18-Barring of All Incoming Calls except for a Specific User |
CR revised to R5-225284 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#447 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224675 | Correction to NR IMS TC 7.4a-MTSI MO Voice Call with preconditions at both originating UE and terminating UE |
CR revised to R5-225435 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#448 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224676 | Correction to NR IMS TC 7.4-MTSI MO Voice Call with preconditions at both originating and terminating UE |
CR revised to R5-225436 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#449 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224677 | Correction to NR IMS TC 7.18-MTSI MO Voice Call |
CR revised to R5-225437 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#450 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224678 | Correction to NR IMS TC 7.19-MTSI MT Voice Call |
CR revised to R5-225438 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#451 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224679 | Correction to NR IMS TC 7.24a-MTSI MO Voice Call |
CR revised to R5-225439 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#452 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224680 | Correction to NR IMS TC 7.24b-MTSI MO Voice Call |
CR revised to R5-225440 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#453 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224681 | Correction to NR IMS TC 10.1-Emergency call with emergency registration | CR | Huawei, Hisilicon | 34.229-5 16.3.0 CR#454 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
withdrawn | [WTS] [JSN] |
R5-224682 | Correction to NR IMS TC 10.3-Emergency call with emergency registration |
CR revised to R5-225441 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#455 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224683 | Correction to NR IMS TC 10.10-Emergency call without emergency registration | CR | Huawei, Hisilicon | 34.229-5 16.3.0 CR#456 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-224684 | Correction to NR IMS TC 10.11-New initial emergency registration |
CR revised to R5-225442 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#457 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224685 | Correction to IMS MO Video call establishment test procedure in 5GC | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2485 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
agreed | [WTS] [JSN] |
R5-224686 | Correction to IMS MT Video call establishment test procedure in 5GC | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2486 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
agreed | [WTS] [JSN] |
R5-224687 | Correction to IMS MO Emergency call release test procedure | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2487 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] |
R5-224688 | Correction to IMS MT Emergency call release test procedure | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2488 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] |
R5-224689 | Correction to IMS MT speech call establishment test procedure in 5GC | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2489 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
agreed | [WTS] [JSN] |
R5-224690 | Update to NR TC 7.1.2.3.3 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3146 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224691 | Update to NR TC 7.1.2.3.5 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3147 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224692 | Update to NR TC 7.1.2.3.6 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3148 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224693 | Update to NR TC 7.1.2.3.8 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3149 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224694 | Update to NR TC 7.1.2.3.9 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3150 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224695 | Update to NR TC 7.1.2.3.10 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3151 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224696 | RedCap UE Test applicability for Legacy test cases |
CR revised to R5-225349 |
Huawei, Hisilicon | 38.523-2 16.12.0 CR#253 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.4 |
revised | [WTS] [JSN] |
R5-224697 | RedCap UE Test applicability for new test cases |
CR revised to R5-225350 |
Huawei, Hisilicon | 38.523-2 16.12.0 CR#254 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.4 |
revised | [WTS] [JSN] |
R5-224698 | Addition of RedCap TC 7.1.1.8.3 - Separate BWP |
CR revised to R5-225344 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#3152 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
revised | [WTS] [JSN] |
R5-224699 | Addition of RedCap TC 7.1.1.1.16 - MSG3 identification on CCCH1 |
CR revised to R5-225345 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#3153 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
revised | [WTS] [JSN] |
R5-224700 | Discussion paper on legacy test cases adjustment for Redcap |
discussion revised to R5-225273 |
Huawei, Hisilicon | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.6 |
revised | [WTS] [JSN] | |
R5-224701 | Discussion paper on IMS Data Channel test | discussion | Huawei, Hisilicon | Rel-17 |
R5-96-e AI: 4.2 |
withdrawn | [WTS] [JSN] | ||
R5-224702 | New WID for IMS Data Channel test | WID new | Huawei, Hisilicon | Rel-17 |
R5-96-e AI: 4.1 |
withdrawn | [WTS] [JSN] | ||
R5-224703 | TS 36.523-1 Tracker status before RAN5-96e | other | Huawei, Hisilicon |
R5-96-e AI: 6.5.6 |
noted | [WTS] [JSN] | |||
R5-224704 | TS 38.523-1 Tracker status before RAN5-96e | other | Huawei, Hisilicon |
R5-96-e AI: 6.4.7 |
noted | [WTS] [JSN] | |||
R5-224705 | TS 36.523-1 Tracker status after RAN5-96e | other | Huawei, Hisilicon |
R5-96-e AI: 7.5 |
reserved | [WTS] [JSN] | |||
R5-224706 | TS 38.523-1 Tracker status after RAN5-96e | other | Huawei, Hisilicon |
R5-96-e AI: 7.5 |
reserved | [WTS] [JSN] | |||
R5-224707 | SR of Rel-16 NR Mobility Enhancement WI after RAN5#96e | WI status report | Huawei, Hisilicon | NR_Mob_enh-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224708 | NR Mobility Enhancement WP after RAN5#96e | Work Plan | Huawei, Hisilicon | NR_Mob_enh-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224709 | SR of Rel-17 NR MBS WI after RAN5 96e | WI status report | Huawei, Hisilicon | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224710 | WP of Rel-17 NR MBS WI after RAN5 96e | Work Plan | Huawei, Hisilicon | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224711 | SR of Rel-16 NR V2X WI after RAN5 96e | WI status report | Huawei, Hisilicon | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224712 | WP of Rel-16 NR V2X WI after RAN5 96e | Work Plan | Huawei, Hisilicon | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224713 | Correction to NR TC 7.1.1.4.2.4 - DCI format 0_1 256QAM | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3154 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-224714 | Correction to NR TC 7.1.1.6.1 - SPS |
CR revised to R5-225378 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#3155 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
revised | [WTS] [JSN] |
R5-224715 | Correction to NR TC 11.1.2 - EPS fallback without N26 | CR | Huawei, Hisilicon,ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3156 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.1 |
withdrawn | [WTS] [JSN] |
R5-224716 | Correction to NR TC 11.3.7 - 0 accessibility for AC2 | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3157 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
agreed | [WTS] [JSN] |
R5-224717 | Correction to NR TC 11.3.9 - ODAC | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3158 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
agreed | [WTS] [JSN] |
R5-224718 | Correction to NR TC 11.4.1 - Emergency call and AKA fail | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3159 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.4 |
agreed | [WTS] [JSN] |
R5-224719 | Correction to NR TC 11.4.5 - Emergency call and forbidden TA |
CR revised to R5-225410 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#3160 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.4 |
revised | [WTS] [JSN] |
R5-224720 | Addition NR TC 11.4.10 back and rename it to 11.4.10a | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3161 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.4 |
agreed | [WTS] [JSN] |
R5-224721 | Correction to LTE RACS test case 9.2.5.1 | CR | Huawei, Hisilicon | 36.523-1 17.2.0 CR#5113 catF | TEI16_Test, RACS-UEConTest | Rel-17 |
R5-96-e AI: 6.5.3.11 |
agreed | [WTS] [JSN] |
R5-224722 | Correction to LTE RACS test case 9.2.5.2 | CR | Huawei, Hisilicon | 36.523-1 17.2.0 CR#5114 catF | TEI16_Test, RACS-UEConTest | Rel-17 |
R5-96-e AI: 6.5.3.11 |
agreed | [WTS] [JSN] |
R5-224723 | Correction to LTE RACS test case 9.2.5.3 | CR | Huawei, Hisilicon | 36.523-1 17.2.0 CR#5115 catF | TEI16_Test, RACS-UEConTest | Rel-17 |
R5-96-e AI: 6.5.3.11 |
agreed | [WTS] [JSN] |
R5-224724 | Update SIB1 to test RedCap UE | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2490 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.1 |
withdrawn | [WTS] [JSN] |
R5-224725 | Update the SN-FieldLength of PDCP-Config and RLC-Config for RedCap test | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2491 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.1 |
agreed | [WTS] [JSN] |
R5-224726 | Addition of RedCap default test channel bandwidth for signaling MFBI test |
CR revised to R5-225342 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2492 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.1 |
revised | [WTS] [JSN] |
R5-224727 | Addition of RedCap default test channel bandwidth for signaling test |
CR revised to R5-225343 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2493 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.1 |
revised | [WTS] [JSN] |
R5-224728 | Update to NR TC 7.1.1.3.4 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3162 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224729 | Update to NR TC 7.1.1.4.1.1 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3163 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224730 | Update to NR TC 7.1.2.3.7 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3164 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224731 | Update to NR TC 7.1.3.4.1 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3165 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224732 | Update to NR TC 7.1.1.4.2.1 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3166 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224733 | Update to NR TC 7.1.1.4.2.3 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3167 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224734 | Update to NR TC 7.1.1.4.2.4 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3168 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224735 | Update to NR TC 7.1.1.4.2.5 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3169 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224736 | Update to NR TC 7.1.1.9.1 to test RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3170 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224737 | Addition of RedCap TC 6.1.2.26 - Cell Selection |
CR revised to R5-225346 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#3171 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
revised | [WTS] [JSN] |
R5-224738 | Addition of RedCap TC 7.1.1.1.17 - Msg1-based UE identification |
CR revised to R5-225347 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#3172 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
revised | [WTS] [JSN] |
R5-224739 | Add Default configuration for DCI format 4_0 scheduling MBS Broadcast test |
CR revised to R5-225280 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2494 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
revised | [WTS] [JSN] |
R5-224740 | Add Default configuration for DCI format 4_1 scheduling MBS Multicast test | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2495 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
agreed | [WTS] [JSN] |
R5-224741 | Add Default configuration for DCI format 4_2 scheduling MBS Multicast test | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2496 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
agreed | [WTS] [JSN] |
R5-224742 | Add test procedures for MBS Multicast test |
CR revised to R5-225325 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2497 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
revised | [WTS] [JSN] |
R5-224743 | Update MBS related parameters into PDU session establishment request | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2498 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
withdrawn | [WTS] [JSN] |
R5-224744 | Update MBS related parameters into PDU session establishment accept | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2499 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
withdrawn | [WTS] [JSN] |
R5-224745 | Update MBS related parameters into PDU session modification request | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2500 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
withdrawn | [WTS] [JSN] |
R5-224746 | Update MBS related parameters into PDU session modification command | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2501 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
withdrawn | [WTS] [JSN] |
R5-224747 | Add SIB20 for MBS Broadcast test |
CR revised to R5-225326 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2502 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
revised | [WTS] [JSN] |
R5-224748 | Add SIB21 for MBS Broadcast test |
CR revised to R5-225327 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2503 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
revised | [WTS] [JSN] |
R5-224749 | Add MBSBroadcastConfiguration for MBS Broadcast test |
CR revised to R5-225328 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2504 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
revised | [WTS] [JSN] |
R5-224750 | Add MBSInterestIndication for MBS Broadcast test |
CR revised to R5-225329 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2505 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
revised | [WTS] [JSN] |
R5-224751 | Add MBS information elements for MBS test |
CR revised to R5-225330 |
Huawei, Hisilicon, Ericsson | 38.508-1 17.5.0 CR#2506 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
revised | [WTS] [JSN] |
R5-224752 | Add Loop back mode C related description for MBS |
CR revised to R5-225331 |
Huawei, Hisilicon | 38.509 17.0.0 CR#70 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.3 |
revised | [WTS] [JSN] |
R5-224753 | Add packet counter reporting procedure for MBS | CR | Huawei, Hisilicon | 38.509 17.0.0 CR#71 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.3 |
withdrawn | [WTS] [JSN] |
R5-224754 | Add State variables for Loop back mode C and MBS packet counter | CR | Huawei, Hisilicon | 38.509 17.0.0 CR#72 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.3 |
withdrawn | [WTS] [JSN] |
R5-224755 | Add test mode C related description for MBS | CR | Huawei, Hisilicon | 38.509 17.0.0 CR#73 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.3 |
withdrawn | [WTS] [JSN] |
R5-224756 | Add TMC message for MBS | CR | Huawei, Hisilicon | 38.509 17.0.0 CR#74 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.3 |
withdrawn | [WTS] [JSN] |
R5-224757 | Correction to NR TC 9.1.10.4 - NSSAA reject | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3173 catF | TEI16_Test, eNS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.7 |
withdrawn | [WTS] [JSN] |
R5-224758 | Add the support of SET UAI test function into the test applicability for 8.1.5.10.1 | CR | Huawei, Hisilicon | 38.523-2 16.12.0 CR#255 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 6.3.9.5 |
withdrawn | [WTS] [JSN] |
R5-224759 | Add Set UAI test function as a new PICS into UE General Capabilities | CR | Huawei, Hisilicon | 38.508-2 17.5.0 CR#369 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 6.3.9.2 |
withdrawn | [WTS] [JSN] |
R5-224760 | Update the the condition for NPN-IdentityInfoList-r16 in CellAccessRelatedInfo | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2507 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.1 |
withdrawn | [WTS] [JSN] |
R5-224761 | New WID on UE Conformance - User Plane Integrity Protection support for EPC connected architectures |
WID new revised to R5-225256 |
Vodafone GmbH | Rel-17 |
R5-96-e AI: 4.1 |
revised | [WTS] [JSN] | ||
R5-224762 | Add IE MeasGapId | CR | Ericsson | 38.508-1 17.5.0 CR#2508 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224763 | Add IE MeasObjectRxTxDiff | CR | Ericsson | 38.508-1 17.5.0 CR#2509 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224764 | Encoding of ellipsoidPointWithAltitude in UPDATE UE LOCATION INFORMATION | CR | ANRITSU LTD | 36.509 17.0.0 CR#215 catF | TEI10_Test | Rel-17 |
R5-96-e AI: 6.5.2 |
agreed | [WTS] [JSN] |
R5-224765 | Update to 6.2D.3 to add AMPR NS_04 for ULFPTx | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1812 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.3.1 |
agreed | [WTS] [JSN] |
R5-224766 | Update to 6.5D.1 to remove measurement on each antenna | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1813 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.3.1 |
withdrawn | [WTS] [JSN] |
R5-224767 | Update to 6.5D.2.3 to add A-SEM NS_04 for ULFPTx | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1814 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.3.1 |
agreed | [WTS] [JSN] |
R5-224768 | Addition of minimum requirment for L1-SINR measurement in 5.7.6.0 | CR | Huawei, HiSilicon | 38.533 17.3.1 CR#1921 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-224769 | Addition of new test case 5.7.6.1 EN-DC FR2 L1-SINR measurement |
CR revised to R5-225847 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1922 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224770 | Addition of TT analysis for eMIMO L1-SINR test case 5.7.6.1 and 7.7.6.1 |
CR revised to R5-225873 |
Huawei, HiSilicon, Sporton | 38.903 16.12.0 CR#361 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224771 | Addition of new test case 5.7.6.2 EN-DC FR2 L1-SINR measurement |
CR revised to R5-225848 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1923 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224772 | Addition of TT analysis for eMIMO L1-SINR test case 5.7.6.2 |
CR revised to R5-225874 |
Huawei, HiSilicon | 38.903 16.12.0 CR#362 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224773 | Addition of new test case 5.7.6.3 EN-DC FR2 L1-SINR measurement |
CR revised to R5-225849 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1924 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224774 | Addition of TT analysis for eMIMO L1-SINR test case 5.7.6.3 |
CR revised to R5-225875 |
Huawei, HiSilicon | 38.903 16.12.0 CR#363 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
revised | [WTS] [JSN] |
R5-224775 | Update to Annex E and F for eMIMO test cases | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#364 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
withdrawn | [WTS] [JSN] |
R5-224776 | Update of eMIMO test case 6.5.5.5 and 6.5.5.6 |
CR revised to R5-225872 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1925 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-224777 | Addition of TT information for 6.5.5.5 and 6.5.5.6 | CR | Huawei, HiSilicon | 38.903 16.12.0 CR#365 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-224778 | Addition of test applicability for eMIMO test cases |
CR revised to R5-225724 |
Huawei, HiSilicon | 38.522 17.5.0 CR#203 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.7 |
revised | [WTS] [JSN] |
R5-224779 | Addition of 6.3G.1 Minimum output power for Tx Diversity | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1815 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-224780 | Addition of 6.3G.2 Transmit OFF power for Tx Diversity | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1816 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-224781 | Addition of 6.3G.3.1 General ON/OFF time mask for Tx Diversity | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1817 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-224782 | Addition of 6.3G.3.2 PRACH time mask for Tx Diversity | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1818 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-224783 | Addition of 6.3G.3.3 SRS time mask for Tx Diversity | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1819 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-224784 | Addition of 6.3G.4.2 Relative power tolerance for Tx Diversity | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1820 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-224785 | Addition of 6.3G.4.3 Aggregate power tolerance for Tx Diversity | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1821 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-224786 | Addition of 6.4G.1 Frequency error for Tx Diversity |
CR revised to R5-225757 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#1822 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
revised | [WTS] [JSN] |
R5-224787 | Addition of 6.4G.2.2 Carrier leakage for Tx Diversity |
CR revised to R5-225758 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#1823 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
revised | [WTS] [JSN] |
R5-224788 | Addition of 6.4G.2.3 In-band emissions for Tx Diversity |
CR revised to R5-225759 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#1824 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
revised | [WTS] [JSN] |
R5-224789 | Addition of 6.4G.2.4 EVM equalizer spectrum flatness for Tx Diversity |
CR revised to R5-225760 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#1825 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
revised | [WTS] [JSN] |
R5-224790 | Update of Annex F to add 6.3G and 6.4G new test cases | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1826 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-224791 | Addition of test applicability for TxD test cases |
CR revised to R5-225765 |
Huawei, HiSilicon | 38.522 17.5.0 CR#204 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.4 |
revised | [WTS] [JSN] |
R5-224792 | Addition of test point analysis for TxD test cases | CR | Huawei, HiSilicon | 38.905 17.5.0 CR#640 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.5 |
agreed | [WTS] [JSN] |
R5-224793 | Correction to 7.3.1-15 |
CR revised to R5-225620 |
ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#2510 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.3 |
revised | [WTS] [JSN] |
R5-224794 | WP UE Conformance Test Aspects - Rel -16 for CLI handling for NR | Work Plan | Qualcomm Korea | NR_CLI-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224795 | SR UE Conformance Test Aspects - Rel -16 for CLI handling for NR | WI status report | Qualcomm Korea | NR_CLI-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224796 | WP - UE Conformance Test Aspects for NR-based Access to Unlicensed Spectrum | Work Plan | Qualcomm Korea | NR_unlic-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224797 | SR - UE Conformance Test Aspects for NR-based Access to Unlicensed Spectrum | WI status report | Qualcomm Korea | NR_unlic-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224798 | WP UE Conformance Test Aspects - Solutions for NR to support non-terrestrial networks (NTN) | Work Plan | Qualcomm Korea | NR_NTN_solutions_plus_CT-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224799 | SR UE Conformance Test Aspects - Solutions for NR to support non-terrestrial networks (NTN) | WI status report | Qualcomm Korea | NR_NTN_solutions_plus_CT-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224800 | WP UE Conformance Test Aspects - Further enhancement on NR demodulation performance | Work Plan | Qualcomm Korea | NR_demod_enh2-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224801 | Update to FR2 L1-RSRP measurement test cases 5.6.3.x | CR | Qualcomm Korea | 38.533 17.3.1 CR#1926 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-224802 | Test Tolerances for FR2 RLM test cases 5.5.1.x |
CR revised to R5-225630 |
Qualcomm Korea | 38.533 17.3.1 CR#1927 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
revised | [WTS] [JSN] |
R5-224803 | TT analysis update for FR2 RLM test cases 5.5.1.x and 7.5.1.x |
CR revised to R5-225636 |
Qualcomm Korea | 38.903 16.12.0 CR#366 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-224804 | Test Tolerances and test case introduction for FR2 RLM test cases 7.5.1.x | CR | Qualcomm Korea | 38.533 17.3.1 CR#1928 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-224805 | TT analysis update for FR2 RLM test cases 7.5.1.x | CR | Qualcomm Korea | 38.533 17.3.1 CR#1929 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
withdrawn | [WTS] [JSN] |
R5-224806 | Discussion on fading crest factor | discussion | Qualcomm Korea | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-224807 | FR2 demod testability update |
CR revised to R5-225670 |
Qualcomm Korea | 38.521-4 16.12.0 CR#566 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.2 |
revised | [WTS] [JSN] |
R5-224808 | Applicability of FWA devices for Demod and RRM test cases |
discussion revised to R5-225640 |
Qualcomm Korea | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-224809 | Editorial correction for 6.2B.1.3 Maximum output power for Inter-band EN-DC within FR1 | CR | TTA | 38.521-3 17.5.0 CR#1418 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-224810 | Editorial correction on PICS for UE general capabilities | CR | TTA | 38.508-2 17.5.0 CR#370 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.2 |
withdrawn | [WTS] [JSN] |
R5-224811 | Addition of 6.3F.1 Minimum output power for NR-U | CR | TTA | 38.521-1 17.5.0 CR#1827 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.4.1 |
agreed | [WTS] [JSN] |
R5-224812 | Addition of 6.4F.1 Frequency error for NR-U | CR | TTA | 38.521-1 17.5.0 CR#1828 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.4.1 |
agreed | [WTS] [JSN] |
R5-224813 | Update TP analysis for AMPR NS_05 and NS_05U |
CR revised to R5-225746 |
MediaTek Beijing Inc. | 38.905 17.5.0 CR#641 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.16.6 |
revised | [WTS] [JSN] |
R5-224814 | Add PC2 test configuration and requirement table for n1 A-MPR |
CR revised to R5-225750 |
MediaTek Beijing Inc. | 38.521-1 17.5.0 CR#1829 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.20.3 |
revised | [WTS] [JSN] |
R5-224815 | Update of A-MPR for n39 | CR | CMCC | 38.521-1 17.5.0 CR#1830 catF | NR_UE_PC2_n39-UEConTest | Rel-17 |
R5-96-e AI: 5.3.25.2.1 |
withdrawn | [WTS] [JSN] |
R5-224816 | Add IE MeasResultRxTxTimeDiff | CR | Ericsson | 38.508-1 17.5.0 CR#2511 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224817 | Add IE MRB-Identity | CR | Ericsson | 38.508-1 17.5.0 CR#2512 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224818 | Add IEs MUSIM-GapConfig, MUSIM-GapID and MUSIM-GapInfo | CR | Ericsson | 38.508-1 17.5.0 CR#2513 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224819 | Add IEs NeedForGapNCSG-ConfigEUTRA, NeedForGapNCSG-ConfigNR, NeedForGapNCSG-InfoEUTRA and NeedForGapNCSG-InfoNR | CR | Ericsson | 38.508-1 17.5.0 CR#2514 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224820 | Add IE NonCellDefiningSSB | CR | Ericsson | 38.508-1 17.5.0 CR#2515 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224821 | Add IE NR-DL-PRS-PDC-Info | CR | Ericsson | 38.508-1 17.5.0 CR#2516 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224822 | Add IEs NSAG-IdentityInfo and NTN-Config | CR | Ericsson | 38.508-1 17.5.0 CR#2517 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224823 | Add IE RA-PrioritizationForSlicing | CR | Ericsson | 38.508-1 17.5.0 CR#2518 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-224824 | Add IEs RxTxTimeDiff, SCellActivationRS-Config and SCellActivationRS-ConfigId | CR | Ericsson | 38.508-1 17.5.0 CR#2519 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224825 | Add IE SemiStaticChannelAccessConfigUE | CR | Ericsson | 38.508-1 17.5.0 CR#2520 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224826 | Introduction of Baseline Implementation Capability for LTE Band 103 | CR | Puloli | 36.521-2 16.13.0 CR#988 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.41.3 |
agreed | [WTS] [JSN] |
R5-224827 | Introduction of LTE Band 103 in Group of band definitions | CR | Puloli | 36.521-2 16.13.0 CR#989 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.1.3 |
withdrawn | [WTS] [JSN] |
R5-224828 | Introduction of LTE Band 103 in Group of band definitions | CR | Puloli | 36.521-3 16.13.0 CR#2651 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.41.4 |
agreed | [WTS] [JSN] |
R5-224829 | Update to 6.2D.3 to align NS_04 test configuration with 6.2.3 |
CR revised to R5-225788 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#1831 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
revised | [WTS] [JSN] |
R5-224830 | Update configuration table of 6.5D.2.3 to refer to AMPR | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1832 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-224831 | Update to SEM for CA | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1833 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-224832 | Update to SEM for SUL | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1834 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-224833 | Addition of PC2 PICS for CA_41C | CR | Huawei, HiSilicon | 38.508-2 17.5.0 CR#371 catF | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.48.2 |
agreed | [WTS] [JSN] |
R5-224834 | Update to MOP for CA to add CA_41C PC2 | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1835 catF | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.48.3.1 |
agreed | [WTS] [JSN] |
R5-224835 | Update to MPR for CA to add CA_41C PC2 | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1836 catF | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.48.3.1 |
agreed | [WTS] [JSN] |
R5-224836 | Update to MPR for CA TP analysis to add PC2 requirements |
CR revised to R5-225779 |
Huawei, HiSilicon | 38.905 17.5.0 CR#642 catF | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.48.7 |
revised | [WTS] [JSN] |
R5-224837 | Update to configured output power for CA to add CA_41C PC2 | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1837 catF | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.48.3.1 |
agreed | [WTS] [JSN] |
R5-224838 | Update to SEM for CA to add CA_41C PC2 | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1838 catF | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.48.3.1 |
agreed | [WTS] [JSN] |
R5-224839 | Update to test applicability of CA test cases to support PC2 | CR | Huawei, HiSilicon | 38.522 17.5.0 CR#205 catF | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.48.4 |
agreed | [WTS] [JSN] |
R5-224840 | Update to V2X test case 12.1.2 | CR | Huawei, HiSilicon | 36.521-3 16.13.0 CR#2652 catF | TEI14_Test, LTE_V2X-UEConTest | Rel-16 |
R5-96-e AI: 5.5.1.5 |
agreed | [WTS] [JSN] |
R5-224841 | Update to TT analysis of V2X test case 12.1.2 | CR | Huawei, HiSilicon | 36.903 16.0.0 CR#447 catF | TEI14_Test, LTE_V2X-UEConTest | Rel-16 |
R5-96-e AI: 5.5.1.6.1 |
agreed | [WTS] [JSN] |
R5-224842 | Update to MOP to add PC2 requirements for band n1 and n3 | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1839 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.32.3.1 |
withdrawn | [WTS] [JSN] |
R5-224843 | Update to MOP to add PC2 TxD requirements for band n1 and n3 | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1840 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.32.3.1 |
agreed | [WTS] [JSN] |
R5-224844 | WF on RedCap RF testing | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1841 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31. |
withdrawn | [WTS] [JSN] |
R5-224845 | Update to 7.1I to capture general excution principle for RedCap test cases | CR | Huawei, HiSilicon | 38.521-1 17.5.0 CR#1842 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.3.2 |
withdrawn | [WTS] [JSN] |
R5-224846 | Draft ITU-R document for IMT-2020 | discussion | Huawei, HiSilicon |
R5-96-e AI: 4.2.2 |
noted | [WTS] [JSN] | |||
R5-224847 | WP - Enhancements on MIMO for NR |
Work Plan revised to R5-225456 |
Huawei, HiSilicon | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
revised | [WTS] [JSN] | |
R5-224848 | SR - Enhancements on MIMO for NR | WI status report | Huawei, HiSilicon | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224849 | WP - RF requirements for NR frequency range 1 (FR1) | Work Plan | Huawei, HiSilicon | NR_RF_FR1-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224850 | SR - RF requirements for NR frequency range 1 (FR1) | WI status report | Huawei, HiSilicon | NR_RF_FR1-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224851 | WP - NR URLLC | Work Plan | Huawei, HiSilicon | NR_L1enh_URLLC-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224852 | SR - NU URLLC | WI status report | Huawei, HiSilicon | NR_L1enh_URLLC-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224853 | WP - Transparent Tx Diversity (TxD) for NR | Work Plan | Huawei, HiSilicon | NR_RF_TxD-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224854 | SR - Transparent Tx Diversity (TxD) for NR | WI status report | Huawei, HiSilicon | NR_RF_TxD-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224855 | WP - Rel-17 RF requirements enhancement for NR frequency range 1 (FR1) | Work Plan | Huawei, HiSilicon | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224856 | SR - Rel-17 RF requirements enhancement for NR frequency range 1 (FR1) | WI status report | Huawei, HiSilicon | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224857 | Addition of n3 CBW 35MHz, 45MHz into refsens | CR | China Unicom | 38.521-1 17.5.0 CR#1843 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.2 |
agreed | [WTS] [JSN] |
R5-224858 | Addition of n8 CBW 35MHz into refsens |
CR revised to R5-225728 |
China Unicom | 38.521-1 17.5.0 CR#1844 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.2 |
revised | [WTS] [JSN] |
R5-224859 | Add IE TCI-Info | CR | Ericsson | 38.508-1 17.5.0 CR#2521 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224860 | Add IE UE-TimersAndConstantsRemoteUE | CR | Ericsson | 38.508-1 17.5.0 CR#2522 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224861 | Add IEs UL-ExcessDelayConfig and UE UL-GapFR2-Config | CR | Ericsson | 38.508-1 17.5.0 CR#2523 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224862 | Add IEs Uplink-PowerControl, Uu-RelayRLC-ChannelConfig and Uu-RelayRLC-ChannelID | CR | Ericsson | 38.508-1 17.5.0 CR#2524 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224863 | Add IE AppLayerMeasParameters | CR | Ericsson | 38.508-1 17.5.0 CR#2525 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224864 | Add IE FR2-2-AccessParamsPerBand | CR | Ericsson | 38.508-1 17.5.0 CR#2526 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224865 | Addition of TX spurious emissions test points for seven UL CA combinations |
CR revised to R5-225733 |
WE Certification Oy, DISH Network, Ericsson | 38.521-1 17.5.0 CR#1845 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.3.1 |
revised | [WTS] [JSN] |
R5-224866 | Tx Spurious emissions test point analysis for many UL CA combos |
CR revised to R5-225737 |
WE Certification Oy, DISH Network, Ericsson | 38.905 17.5.0 CR#643 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13. |
revised | [WTS] [JSN] |
R5-224867 | Addition many 4CA NR combinations to reference sensitivity test |
CR revised to R5-225734 |
WE Certification Oy, DISH Network | 38.521-1 17.5.0 CR#1846 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.3.2 |
revised | [WTS] [JSN] |
R5-224868 | Addition of configurations for many 4CA NR combinations |
CR revised to R5-225731 |
WE Certification Oy, DISH Network | 38.508-1 17.5.0 CR#2527 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.1.1 |
revised | [WTS] [JSN] |
R5-224869 | Addition of applicability statement for many 4CA NR combinations |
CR revised to R5-225732 |
WE Certification Oy, DISH Network | 38.508-2 17.5.0 CR#372 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.2 |
revised | [WTS] [JSN] |
R5-224870 | Test point analysis for reference sensitivity for many 4CA combos |
CR revised to R5-225738 |
WE Certification Oy, DISH Network | 38.905 17.5.0 CR#644 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13. |
revised | [WTS] [JSN] |
R5-224871 | A-MPR TP analysis for Rel-17 CA_n24-n41 |
CR revised to R5-225739 |
Ligado Networks | 38.905 17.5.0 CR#645 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13. |
revised | [WTS] [JSN] |
R5-224872 | A-MPR TP analysis for Rel-17 CA_n24-n48 | CR | Ligado Networks | 38.905 17.5.0 CR#646 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13. |
agreed | [WTS] [JSN] |
R5-224873 | A-MPR TP analysis for Rel-17 CA_n24-n77 | CR | Ligado Networks | 38.905 17.5.0 CR#647 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13. |
agreed | [WTS] [JSN] |
R5-224874 | Updating A-MPR Test Case for CA_n24-n41 | CR | Ligado Networks | 38.521-1 17.5.0 CR#1847 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.3.1 |
agreed | [WTS] [JSN] |
R5-224875 | Updating A-MPR Test Case for CA_n24-n48 | CR | Ligado Networks | 38.521-1 17.5.0 CR#1848 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.3.1 |
agreed | [WTS] [JSN] |
R5-224876 | Updating A-MPR Test Case for CA_n24-n77 | CR | Ligado Networks | 38.521-1 17.5.0 CR#1849 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.3.1 |
agreed | [WTS] [JSN] |
R5-224877 | Add IE NTN-Parameters | CR | Ericsson | 38.508-1 17.5.0 CR#2528 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224878 | Add IE PosSRS-RRC-Inactive-OutsideInitialUL-BWP-r17 | CR | Ericsson | 38.508-1 17.5.0 CR#2529 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224879 | Editorial update IE RAT-Type |
CR revised to R5-225364 |
Ericsson | 38.508-1 17.5.0 CR#2530 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.2 |
revised | [WTS] [JSN] |
R5-224880 | Add IE RedCapParameters | CR | Ericsson | 38.508-1 17.5.0 CR#2531 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224881 | Add IE SRS-AllPosResourcesRRC-Inactive | CR | Ericsson | 38.508-1 17.5.0 CR#2532 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224882 | Add IE UE-RadioPagingInfo | CR | Ericsson | 38.508-1 17.5.0 CR#2533 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224883 | Add IE AppLayerMeasConfig | CR | Ericsson | 38.508-1 17.5.0 CR#2534 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224884 | Ref sensitivity TP selection for DC_2A_n41A |
CR revised to R5-225825 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#648 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
revised | [WTS] [JSN] |
R5-224885 | Correction of 6.5.3.3 for NS_14 | CR | Qualcomm Austria RFFE GmbH | 38.521-1 17.5.0 CR#1850 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.3.1 |
agreed | [WTS] [JSN] |
R5-224886 | TP analysis for additional spurious emission for NS_14 | CR | Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#649 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.9 |
agreed | [WTS] [JSN] |
R5-224887 | Update Spurious emission TP R16 DC_5A_n2A |
CR revised to R5-225716 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#650 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
revised | [WTS] [JSN] |
R5-224888 | Update 6.5B.3.3.2 for DC_5A_n2A |
CR revised to R5-225707 |
Qualcomm Austria RFFE GmbH | 38.521-3 17.5.0 CR#1419 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
revised | [WTS] [JSN] |
R5-224889 | Ref sensitivity TP selection for DC_1A_n77A |
CR revised to R5-225826 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#651 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
revised | [WTS] [JSN] |
R5-224890 | Ref sensitivity TP selection for DC_3A_n77A |
CR revised to R5-225827 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#652 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
revised | [WTS] [JSN] |
R5-224891 | Ref sensitivity TP selection for DC_8A_n78A |
CR revised to R5-225828 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#653 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
revised | [WTS] [JSN] |
R5-224892 | Ref sensitivity TP selection for DC_5A_n78A |
CR revised to R5-225829 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#654 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
revised | [WTS] [JSN] |
R5-224893 | Ref sensitivity TP selection for DC_8A_n79A |
CR revised to R5-225830 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#655 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
revised | [WTS] [JSN] |
R5-224894 | Ref sensitivity TP selection for DC_21A_n79A |
CR revised to R5-225831 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#656 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
revised | [WTS] [JSN] |
R5-224895 | Update for ref sensitivity for R15_combos |
CR revised to R5-225807 |
Qualcomm Austria RFFE GmbH | 38.521-3 17.5.0 CR#1420 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.2 |
revised | [WTS] [JSN] |
R5-224896 | Update for reference sensitivity for DC_48A_n66A |
CR revised to R5-225709 |
Qualcomm Austria RFFE GmbH | 38.521-3 17.5.0 CR#1421 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.2 |
revised | [WTS] [JSN] |
R5-224897 | Update for reference sensitivity for DC_5A_n77A |
CR revised to R5-225736 |
Qualcomm Austria RFFE GmbH | 38.521-3 17.5.0 CR#1422 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.5.2 |
revised | [WTS] [JSN] |
R5-224898 | Update 6.5.3 Spur-emiss R16_17 |
CR revised to R5-225720 |
Qualcomm Austria RFFE GmbH | 38.521-1 17.5.0 CR#1851 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.1 |
revised | [WTS] [JSN] |
R5-224899 | Update IBB for NR-U | CR | Qualcomm Austria RFFE GmbH | 38.521-1 17.5.0 CR#1852 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.4.2 |
agreed | [WTS] [JSN] |
R5-224900 | Adding OOB blocking for NR-U | CR | Qualcomm Austria RFFE GmbH | 38.521-1 17.5.0 CR#1853 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.4.2 |
agreed | [WTS] [JSN] |
R5-224901 | General rule for TP selection for NR_U test cases | CR | Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#657 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18. |
agreed | [WTS] [JSN] |
R5-224902 | Introduction of Spurious response for NR_U | CR | Qualcomm Austria RFFE GmbH | 38.521-1 17.5.0 CR#1854 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.4.2 |
agreed | [WTS] [JSN] |
R5-224903 | Update applicability for NR-U test cases | CR | Qualcomm Austria RFFE GmbH | 38.522 17.5.0 CR#206 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.7 |
agreed | [WTS] [JSN] |
R5-224904 | Addition of Wide band Intermodulation for NR_U | CR | Qualcomm Austria RFFE GmbH | 38.521-1 17.5.0 CR#1855 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.4.2 |
agreed | [WTS] [JSN] |
R5-224905 | Update TT for NR_U test cases | CR | Qualcomm Austria RFFE GmbH | 38.521-1 17.5.0 CR#1856 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 5.3.18.4.3 |
agreed | [WTS] [JSN] |
R5-224906 | Reference sensitivity power level for CA, update on intra-band non-continuous CA |
CR revised to R5-225744 |
Apple Hungary Kft. | 38.521-2 16.12.0 CR#786 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.2 |
revised | [WTS] [JSN] |
R5-224907 | Reference sensitivity power level for CA, editor notes update on ETC | CR | Apple Hungary Kft. | 38.521-2 16.12.0 CR#787 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.2 |
agreed | [WTS] [JSN] |
R5-224908 | New WID on UE Conformance - Multiple Input Multiple Output (MIMO) Over-the-Air (OTA) requirements for NR UEs |
WID new revised to R5-225257 |
Apple, CAICT, Keysight | Rel-17 |
R5-96-e AI: 4.1 |
revised | [WTS] [JSN] | ||
R5-224909 | Update IE DownlinkConfigCommonSIB | CR | Qualcomm France | 38.508-1 17.5.0 CR#2535 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-224910 | Update IE LBT FailureRecoveryConfig |
CR revised to R5-225321 |
Qualcomm France | 38.508-1 17.5.0 CR#2536 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 6.3.17.1 |
revised | [WTS] [JSN] |
R5-224911 | Update of 7.1I for RedCap UE |
CR revised to R5-225654 |
China Unicom | 38.521-1 17.5.0 CR#1857 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.3.2 |
revised | [WTS] [JSN] |
R5-224912 | Update IE MeasObjectNR | CR | Qualcomm France | 38.508-1 17.5.0 CR#2537 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-224913 | Add IE MeasResultForRSSI | CR | Qualcomm France | 38.508-1 17.5.0 CR#2538 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-224914 | Update IE MeasResults | CR | Qualcomm France | 38.508-1 17.5.0 CR#2539 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-224915 | Add IE MeasRSSI-ReportConfig | CR | Qualcomm France | 38.508-1 17.5.0 CR#2540 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-224916 | Update IE ReportConfigNR | CR | Qualcomm France | 38.508-1 17.5.0 CR#2541 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-224917 | Add IE RMTC Config | CR | Qualcomm France | 38.508-1 17.5.0 CR#2542 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-224918 | Correction to A.2.4 | CR | Qualcomm France | 34.229-1 16.2.0 CR#1505 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.1 |
withdrawn | [WTS] [JSN] |
R5-224919 | Update of Refsens TC for RedCap UE in 7.3I |
CR revised to R5-225683 |
China Unicom | 38.521-1 17.5.0 CR#1858 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.3.2 |
revised | [WTS] [JSN] |
R5-224920 | Revised WID: UE Conformance Test Aspects - New Rel-16 NR bands and extension of existing NR bands | WID revised | Ericsson | NR_bands_BW_R16-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
R5-224921 | Update to NR EIEI test case 11.5.6 | CR | Qualcomm France | 38.523-1 16.12.0 CR#3174 catF | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 6.3.16.3 |
agreed | [WTS] [JSN] |
R5-224922 | Correction of NR V2X test case 12.1.6.3 |
CR revised to R5-225294 |
Lenovo | 38.523-1 16.12.0 CR#3175 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
revised | [WTS] [JSN] |
R5-224923 | Correction of NR V2X test case 13.2.4 |
CR revised to R5-225295 |
Lenovo | 38.523-1 16.12.0 CR#3176 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
revised | [WTS] [JSN] |
R5-224924 | Correction of NR SNPN test case 10.1.7.1 |
CR revised to R5-225308 |
Lenovo | 38.523-1 16.12.0 CR#3177 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
revised | [WTS] [JSN] |
R5-224925 | Introduce PICS for eNS | CR | Lenovo | 38.508-2 17.5.0 CR#373 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.2 |
withdrawn | [WTS] [JSN] |
R5-224926 | Addition of new eNS Test Case for NSAC Initial registration rejected |
CR revised to R5-225340 |
Lenovo | 38.523-1 16.12.0 CR#3178 catF | eNS_Ph2-UEConTest | Rel-16 |
R5-96-e AI: 6.3.24.3 |
revised | [WTS] [JSN] |
R5-224927 | Addition of applicability of new eNS Test Case for NSAC Initial registration rejected | CR | Lenovo | 38.523-2 16.12.0 CR#256 catF | eNS_Ph2-UEConTest | Rel-16 |
R5-96-e AI: 6.3.24.4 |
withdrawn | [WTS] [JSN] |
R5-224928 | Correction of UL Grant Prioritization MAC test case | CR | Lenovo, MCC TF160 | 38.523-1 16.12.0 CR#3179 catF | TEI16_Test, NR_IioT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-224929 | Addition of new NR-NR Dual Connectivity test case | CR | Lenovo | 38.523-1 16.12.0 CR#3180 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.18.3 |
agreed | [WTS] [JSN] |
R5-224930 | Addition of Applicability of new NR-NR Dual Connectivity test case |
CR revised to R5-225322 |
Lenovo | 38.523-2 16.12.0 CR#257 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.18.4 |
revised | [WTS] [JSN] |
R5-224931 | Introduce and update PICS | CR | Lenovo | 38.508-2 17.5.0 CR#374 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.2 |
withdrawn | [WTS] [JSN] |
R5-224932 | Agenda - opening session |
agenda revision of R5-223900 |
WG Chairman |
R5-96-e AI: 1 |
approved | [WTS] [JSN] | |||
R5-224933 | Corrections on 2 Rx antenna ports capabilities for band n29 |
CR revised to R5-225783 |
ZTE Corporation | 38.508-2 17.5.0 CR#375 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.2 |
revised | [WTS] [JSN] |
R5-224934 | Corrections on Mid test channel bandwidth for band n66 for Redcap |
CR revised to R5-225766 |
ZTE Corporation | 38.508-1 17.5.0 CR#2543 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.1 |
revised | [WTS] [JSN] |
R5-224935 | Corrections on requirements of A-MPR for NS_05 and NS_05U | CR | ZTE Corporation | 38.521-1 17.5.0 CR#1859 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-224936 | Corrections on test configuration table in spurious emission band UE co-existence for Rel-15 inter-band EN-DC configuration | CR | ZTE Corporation | 38.521-3 17.5.0 CR#1423 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-224937 | Corrections on test configuration table in spurious emission band UE co-existence for Rel-16 inter-band EN-DC configuration |
CR revised to R5-225708 |
ZTE Corporation | 38.521-3 17.5.0 CR#1424 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
revised | [WTS] [JSN] |
R5-224938 | Editorial corrections to the timeline for introduction of test points | CR | ZTE Corporation | 38.905 17.5.0 CR#658 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-224939 | Introduction of DC_2A-66A_n41A reference sensitivity test requirements | CR | ZTE Corporation | 38.521-3 17.5.0 CR#1425 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.2 |
agreed | [WTS] [JSN] |
R5-224940 | Introduction of reference sensitivity test point analysis for DC_2A-66A_n41A | CR | ZTE Corporation | 38.905 17.5.0 CR#659 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224941 | Update of reference sensitivity power level for 3DL CA | CR | ZTE Corporation | 38.521-1 17.5.0 CR#1860 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.2 |
agreed | [WTS] [JSN] |
R5-224942 | Corrections on general spurious emission test requirements for DC_2A_n5A | CR | ZTE Corporation | 38.521-3 17.5.0 CR#1426 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-224943 | Update of Rel-16 EN-DC configuration DC_2A_n41A in spurious emission test cases | CR | ZTE Corporation | 38.521-3 17.5.0 CR#1427 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224944 | Update of spurious emission TP analysis for Rel-16 EN-DC configuration DC_2A_n41A | CR | ZTE Corporation | 38.905 17.5.0 CR#660 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224945 | Update of spurious emission TP analysis for Rel-16 EN-DC configuration DC_7A_n3A | CR | ZTE Corporation | 38.905 17.5.0 CR#661 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224946 | Update of DC_8A_n41A, DC_3A_n41A, DC_25A_n41A, DC_26A_n41A, DC_39A_n41A and DC_40A_n41A in spurious emission test cases | CR | ZTE Corporation | 38.521-3 17.5.0 CR#1428 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224947 | Update of spurious emission TP analysis for Rel-16 EN-DC configuration DC_8A_n41A | CR | ZTE Corporation | 38.905 17.5.0 CR#662 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224948 | Update of spurious emission TP analysis for Rel-16 EN-DC configuration DC_13A_n2A | CR | ZTE Corporation | 38.905 17.5.0 CR#663 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224949 | Update of spurious emission TP analysis for Rel-16 EN-DC configuration DC_20A_n1A | CR | ZTE Corporation | 38.905 17.5.0 CR#664 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224950 | Update of Rel-16 EN-DC configuration DC_48A_n5A in spurious emission test cases | CR | ZTE Corporation | 38.521-3 17.5.0 CR#1429 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224951 | Update of spurious emission TP analysis for Rel-16 EN-DC configuration DC_48A_n5A | CR | ZTE Corporation | 38.905 17.5.0 CR#665 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224952 | Update of Rel-16 EN-DC configuration DC_48A_n66A in spurious emission test cases | CR | ZTE Corporation | 38.521-3 17.5.0 CR#1430 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224953 | Update of spurious emission TP analysis for Rel-16 EN-DC configuration DC_48A_n66A | CR | ZTE Corporation | 38.905 17.5.0 CR#666 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224954 | Update of Rel-16 EN-DC configuration DC_66A_n41A in spurious emission test cases | CR | ZTE Corporation | 38.521-3 17.5.0 CR#1431 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-224955 | Update of spurious emission TP analysis for Rel-16 EN-DC configuration DC_66A_n41A | CR | ZTE Corporation | 38.905 17.5.0 CR#667 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224956 | Discussion on spurious emission for UE co-existence limits in RAN5 |
discussion revised to R5-225651 |
ZTE Corporation | NR_CADC_NR_LTE_DC_R16-UEConTest, NR_CADC_NR_LTE_DC_R17-UEConTest |
R5-96-e AI: 5.3.3.11 |
revised | [WTS] [JSN] | ||
R5-224957 | Corrections on spurious emission for UE co-existence limits for EN-DC configurations |
CR revised to R5-225649 |
ZTE Corporation | 38.521-3 17.5.0 CR#1432 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
revised | [WTS] [JSN] |
R5-224958 | Corrections on spurious emission for UE co-existence limits for inter-band CA configurations |
CR revised to R5-225648 |
ZTE Corporation | 38.521-1 17.5.0 CR#1861 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.1 |
revised | [WTS] [JSN] |
R5-224959 | Editorial corrections to spurious emission test cases for DC_8A_n3A, DC_8A_n20A and DC_20A_n3A | CR | ZTE Corporation | 38.905 17.5.0 CR#668 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-224960 | SR of LTE-NR & NR-NR Dual Connectivity and NR CA enhancements for RAN_WG5_96e | WI status report | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224961 | WP for LTE-NR & NR-NR Dual Connectivity and NR CA enhancements for RAN_WG5_96e | Work Plan | Nokia, Nokia Shanghai Bell |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |||
R5-224962 | Revised WID for LTE-NR & NR-NR Dual Connectivity and NR CA enhancements | WID revised | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
R5-224963 | SR for Enhanced IIoT and URLLC support for NR for RAN WG5 96-e | WI status report | Nokia, Nokia Shanghai Bell | LTE_NR_DC_CA_enh-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-224964 | Update of protocol applicability for DC_19A_n77(2A), DC_19A_n78(2A), DC_21A_n77(2A) and DC_21A_n78(2A) |
CR revised to R5-225310 |
Ericsson | 38.508-1 17.5.0 CR#2544 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-224965 | Incorrect TP analysis revision for test case 6.2D.2 | CR | Ericsson | 38.905 17.5.0 CR#669 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-224966 | Update TS 38.523-1 clause 5.3 for RedCap UE | CR | Huawei, Hisilicon | 38.523-1 16.12.0 CR#3181 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
not pursued | [WTS] [JSN] |
R5-224967 | LCID of CCCH and CCCH1 update for RedCap UE | CR | Huawei, Hisilicon | 38.523-3 17.3.0 CR#2703 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.5 |
not pursued | [WTS] [JSN] |
R5-224968 | Editorial, putting C003a and C003b in correct order | CR | Ericsson | 38.522 17.5.0 CR#207 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.8 |
agreed | [WTS] [JSN] |
R5-224969 | Add new test case 6.5G.1 |
CR revised to R5-225761 |
China Telecom Corporation Ltd. | 38.521-1 17.5.0 CR#1862 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
revised | [WTS] [JSN] |
R5-224970 | Correction of KMS Request URIs in HTTP POST |
CR revised to R5-225275 |
Motorola Solutions Poland | 36.579-1 15.6.0 CR#271 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
revised | [WTS] [JSN] |
R5-224971 | Correction to NR testcase 7.1.1.6.3 | CR | ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3182 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
withdrawn | [WTS] [JSN] |
R5-224972 | Minimum test time for new HST enhancement RMCs |
CR revised to R5-225770 |
Ericsson | 38.521-4 16.12.0 CR#567 catF | NR_HST_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.38.3.4 |
revised | [WTS] [JSN] |
R5-224973 | Addition of applicability of new eNS Test Case for NSAC Initial registration rejected |
CR revised to R5-225341 |
Lenovo | 38.523-2 16.12.0 CR#258 catF | eNS_Ph2-UEConTest | Rel-16 |
R5-96-e AI: 6.3.24.4 |
revised | [WTS] [JSN] |
R5-224974 | Introduce and update PICS | CR | Lenovo | 38.508-2 17.5.0 CR#376 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.2 |
withdrawn | [WTS] [JSN] |
R5-224975 | WP on NR_redcap_plus_ARCH-UEConTest for R5#96 meeting | Work Plan | China Unicom | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224976 | Addition of test case 5.2A.2.4.1, 2Rx Normal Demodulation Performance for HST-SFN CA | CR | Ericsson | 38.521-4 16.12.0 CR#568 catF | NR_HST_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.38.3.1 |
withdrawn | [WTS] [JSN] |
R5-224977 | SR on NR_redcap_plus_ARCH-UEConTest for R5#96 meeting | WI status report | China Unicom | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224978 | Revised WID on NR_redcap_plus_ARCH-UEConTest |
WID revised revised to R5-225445 |
China Unicom, Hisilicon, Ericsson, Huawei, Qualcomm | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
revised | [WTS] [JSN] | |
R5-224979 | Correction to 5GS IMS test case 7.2 |
CR revised to R5-225443 |
ANRITSU LTD, Huawei, HiSilicon, ROHDE & SCHWARZ | 34.229-5 16.3.0 CR#458 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-224980 | WP on NR_PC2_UE_FDD-UEConTest for R5#96 meeting | Work Plan | China Unicom | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224981 | SR on NR_PC2_UE_FDD-UEConTest for R5#96 meeting | WI status report | China Unicom | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224982 | Update of MOP TC to add PC2 requirements for band n1 and n3 | CR | China Unicom | 38.521-1 17.5.0 CR#1863 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.32.3.1 |
agreed | [WTS] [JSN] |
R5-224983 | HST FR2 6.2.3 UE maximum output power with additional requirements |
CR revised to R5-225771 |
Samsung | 38.521-2 16.12.0 CR#788 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
revised | [WTS] [JSN] |
R5-224984 | HST FR2 6.2D.1.1 adding Release-17 FR2 PC6 UE maximum output power for UL MIMO |
CR revised to R5-225772 |
Samsung | 38.521-2 16.12.0 CR#789 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
revised | [WTS] [JSN] |
R5-224985 | HST FR2 6.3.1 adding Release-17 FR2 PC6 Minimum output power |
CR revised to R5-225773 |
Samsung | 38.521-2 16.12.0 CR#790 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
revised | [WTS] [JSN] |
R5-224986 | HST FR2 6.4.2.2 adding Release-17 FR2 PC6 Carrier leakage |
CR revised to R5-225774 |
Samsung | 38.521-2 16.12.0 CR#791 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
revised | [WTS] [JSN] |
R5-224987 | HST FR2 6.4.2.3 adding Release-17 FR2 PC6 In-band emissions |
CR revised to R5-225775 |
Samsung | 38.521-2 16.12.0 CR#792 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
revised | [WTS] [JSN] |
R5-224988 | WP on NR_HST_FR2-UEConTest | Work Plan | Samsung | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
withdrawn | [WTS] [JSN] | |
R5-224989 | WP on NR_feMIMO-UEConTest | Work Plan | Samsung, Huawei, Hisilicon | NR_feMIMO-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
withdrawn | [WTS] [JSN] | |
R5-224990 | Update of PC2 UE requirements for band n1 and n3 into TC 7.3.2 |
CR revised to R5-225768 |
China Unicom | 38.521-1 17.5.0 CR#1864 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.32.3.2 |
revised | [WTS] [JSN] |
R5-224991 | WP on NR_4Rx_Bn8_FWA-UEConTest for R5#96 meeting | Work Plan | China Unicom | NR_4Rx_Bn8_FWA-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
withdrawn | [WTS] [JSN] | |
R5-224992 | Add IE DedicatedInfoF1c | CR | Ericsson | 38.508-1 17.5.0 CR#2545 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-224993 | WP on NR_4Rx_Bn8_FWA-UEConTest for R5#96 meeting | Work Plan | China Unicom | NR_4Rx_Bn8_FWA-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224994 | SR - UE Conformance - Introduction of upper 700MHz A block E-UTRA band for the US (band 103) | WI status report | Puloli | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224995 | SR on NR_4Rx_Bn8_FWA-UEConTest for R5#96 meeting | WI status report | China Unicom | NR_4Rx_Bn8_FWA-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224996 | WP - UE Conformance - Introduction of upper 700MHz A block E-UTRA band for the US (band 103) | Work Plan | Puloli | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-224997 | PRD-17 on Guidance to Work Item Codes (post RAN#97 version) | other | Bureau Veritas (Rapporteur) |
R5-96-e AI: 7.3.2 |
postponed | [WTS] [JSN] | |||
R5-224998 | Correction to applicability of 5G test cases | CR | Bureau Veritas, Huawei, HiSilicon | 38.522 17.5.0 CR#208 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.8 |
agreed | [WTS] [JSN] |
R5-224999 | Update to R15 Configuration for DC | CR | Bureau Veritas | 38.521-3 17.5.0 CR#1433 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.3 |
withdrawn | [WTS] [JSN] |
R5-225000 | Update to R16 Configuration for DC | CR | Bureau Veritas, Nokia | 38.521-3 17.5.0 CR#1434 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.3 |
agreed | [WTS] [JSN] |
R5-225001 | Update to R17 Configuration for DC | CR | Bureau Veritas | 38.521-3 17.5.0 CR#1435 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.5.3 |
agreed | [WTS] [JSN] |
R5-225002 | Editorial correction to 5G RRM test case 7.6.1.x |
CR revised to R5-225822 |
Bureau Veritas, Keysight | 38.533 17.3.1 CR#1930 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
revised | [WTS] [JSN] |
R5-225003 | Editorial correction to UTRA ACLR test cases | CR | Bureau Veritas | 38.521-1 17.5.0 CR#1865 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225004 | Editorial correction to sub-clause ID for test requirement to TC5.2.3.2.1_x | CR | Bureau Veritas | 38.521-4 16.12.0 CR#569 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-225005 | Editorial correction to reference table ID to TC6.2B.1.3 | CR | Bureau Veritas | 38.521-3 17.5.0 CR#1436 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225006 | Update to test case 6.5B.3.3.2 | CR | Bureau Veritas | 38.521-3 17.5.0 CR#1437 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225007 | Add IE MeasConfigAppLayerId | CR | Ericsson | 38.508-1 17.5.0 CR#2546 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-225008 | New connection diagram for RF, 1x4 in static propagation conditions |
CR revised to R5-225833 |
Ericsson | 36.508 17.2.0 CR#1396 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.1 |
revised | [WTS] [JSN] |
R5-225009 | WP of UE Conformance - NB-IoT/eMTC support for Non-Terrestrial Networks (NTN) including EPS aspects | Work Plan | MediaTek Inc. | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest |
R5-96-e AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-225010 | SR of UE Conformance - NB-IoT/eMTC support for Non-Terrestrial Networks (NTN) including EPS aspects | WI status report | MediaTek Inc. | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-225011 | Add new test case 6.5G.3.1 | CR | China Telecom Corporation Ltd. | 38.521-1 17.5.0 CR#1866 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-225012 | Test case 9.8.1.1 to be applicable for any UE supporting ce-ModeA | CR | Ericsson | 36.521-2 16.13.0 CR#990 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.4 |
withdrawn | [WTS] [JSN] |
R5-225013 | Addition of default SIB message content for Rel-17 NTN IoT |
CR revised to R5-225359 |
MediaTek Inc. | 36.508 17.2.0 CR#1397 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.1 |
revised | [WTS] [JSN] |
R5-225014 | Add new test case 6.5G.4 |
CR revised to R5-225762 |
China Telecom Corporation Ltd. | 38.521-1 17.5.0 CR#1867 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
revised | [WTS] [JSN] |
R5-225015 | Addition of PICS for Rel-17 NTN IoT | CR | MediaTek Inc. | 36.523-2 17.2.0 CR#1374 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.4 |
agreed | [WTS] [JSN] |
R5-225016 | Add chapter MBS information elements | CR | Ericsson | 38.508-1 17.5.0 CR#2547 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-225017 | Updates to TR 38.918 | CR | CMCC | 38.918 18.0.0 CR#1 catF | FS_NR_Slice_Test | Rel-18 |
R5-96-e AI: 4.5.5.1 |
agreed | [WTS] [JSN] |
R5-225018 | Summary of the documents for TR 38.918 | discussion | CMCC | FS_NR_Slice_Test | Rel-18 |
R5-96-e AI: 4.5.5.2 |
noted | [WTS] [JSN] | |
R5-225019 | Test case 9.8.1.1 to be applicable for any UE supporting ce-ModeA |
CR revised to R5-225836 |
Ericsson | 36.521-2 16.13.0 CR#991 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-16 |
R5-96-e AI: 5.5.1.4 |
revised | [WTS] [JSN] |
R5-225020 | Addition of applicability for Rel-17 NTN IoT cases | CR | MediaTek Inc. | 36.523-2 17.2.0 CR#1375 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.4 |
agreed | [WTS] [JSN] |
R5-225021 | Making test case 9.8.1.1 applicable to any UE supporting ce-ModeA |
CR revised to R5-225835 |
Ericsson | 36.521-1 17.3.0 CR#5418 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.3.3 |
revised | [WTS] [JSN] |
R5-225022 | General updates of clause 5 for R17 CADC configurations |
CR revised to R5-225735 |
China Unicom, Nokia, WE Certification | 38.521-1 17.5.0 CR#1868 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.3.3 |
revised | [WTS] [JSN] |
R5-225023 | Handling of FR2 PC1 in RAN5 |
discussion revised to R5-225641 |
NTT DOCOMO INC., Anritsu, Keysight | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-225024 | Addition of test case 5.2A.2.4.1, 2Rx Normal Demodulation Performance for HST-SFN CA | CR | Ericsson | 38.521-4 16.12.0 CR#570 catF | NR_HST_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.38.3.1 |
agreed | [WTS] [JSN] |
R5-225025 | SR - UE Conformance - Introduction of UE TRP (Total Radiated Power) and TRS (Total Radiated Sensitivity) requirements and test methodologies for FR1 (NR SA and EN-DC) | WI status report | Apple Portugal | NR_FR1_TRP_TRS-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225026 | WP - UE Conformance - Introduction of UE TRP (Total Radiated Power) and TRS (Total Radiated Sensitivity) requirements and test methodologies for FR1 (NR SA and EN-DC) | Work Plan | Apple Portugal | NR_FR1_TRP_TRS-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225027 | SR - UE Conformance Test Aspects – NR RRM enhancements | WI status report | Apple Portugal | NR_RRM_enh-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225028 | WP - UE Conformance Test Aspects – NR RRM enhancements | Work Plan | Apple Portugal | NR_RRM_enh-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225029 | EIRP-based test metric for FR2 SEM test | discussion | Apple Portugal | TEI15_Test | Rel-16 |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | |
R5-225030 | Update FR2 SEM test with optional use of EIRP as metric | CR | Apple Portugal | 38.521-2 16.12.0 CR#793 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
withdrawn | [WTS] [JSN] |
R5-225031 | Add EN-DC Enhanced Beam Correspondence Test Case | CR | Apple Portugal | 38.521-3 17.5.0 CR#1438 catF | NR_RF_FR2_req_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.15.4.1 |
agreed | [WTS] [JSN] |
R5-225032 | Discussion on NR-DC RF tests | discussion | Apple Portugal | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.7 |
noted | [WTS] [JSN] | |
R5-225033 | Update to test coverage rules in FR1 SA RF tests | CR | Apple Portugal | 38.521-1 17.5.0 CR#1869 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.3.3 |
agreed | [WTS] [JSN] |
R5-225034 | Draft ITU-R recommendation on Unwanted Emissions for IMT-2020 (5G) from TS 38.521-2 | discussion | Apple Portugal |
R5-96-e AI: 4.2.2 |
noted | [WTS] [JSN] | |||
R5-225035 | Update to UE coexistence requirements for single bands n7 and n79 | CR | Apple Portugal | 38.521-1 17.5.0 CR#1870 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
withdrawn | [WTS] [JSN] |
R5-225036 | Updates to receiver requirements for TxD scenarios |
CR revised to R5-225763 |
Apple Portugal | 38.521-1 17.5.0 CR#1871 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.2 |
revised | [WTS] [JSN] |
R5-225037 | Corrections on band combinations for UE co-existence | CR | Apple Portugal | 38.521-1 17.5.0 CR#1872 catF | NR_PC2_CA_R17_2BDL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.21.3.1 |
withdrawn | [WTS] [JSN] |
R5-225038 | Addition of test case 5.2A.2.5.1, 2RX PDSCH Demodulation Performance for HST-DPS CA |
CR revised to R5-225769 |
Ericsson | 38.521-4 16.12.0 CR#571 catF | NR_HST_FR1_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.38.3.1 |
revised | [WTS] [JSN] |
R5-225039 | Add new test case 11.8.5 Inter-system mobility between untrusted Non-3GPP and 3GPP system/Handover from 5GS to EPC/ePDG |
CR revised to R5-225412 |
China Telecom | 38.523-1 16.12.0 CR#3183 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.4.11.6 |
revised | [WTS] [JSN] |
R5-225040 | Removal of brackets for DCI format in clause 5 |
CR revised to R5-225810 |
Ericsson | 38.521-4 16.12.0 CR#572 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
revised | [WTS] [JSN] |
R5-225041 | Update description for release column | CR | CMCC | 38.508-2 17.5.0 CR#377 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-225042 | Add new test case 11.8.6 Inter-system mobility between untrusted Non-3GPP and 3GPP system/Handover from EPC/ePDG to 5GS/ UE in 5GMM-DEREGISTERED and EMM-DEREGISTERED states |
CR revised to R5-225450 |
China Telecom | 38.523-1 16.12.0 CR#3184 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.4.11.6 |
revised | [WTS] [JSN] |
R5-225043 | Update of test case 9.1.10.4 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3185 catF | TEI16_Test, eNS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.7 |
withdrawn | [WTS] [JSN] |
R5-225044 | Update of NR MDT test case 8.1.6.1.3.6 |
CR revised to R5-225390 |
MediaTek Inc. | 38.523-1 16.12.0 CR#3186 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
revised | [WTS] [JSN] |
R5-225045 | Add applicability for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system |
CR revised to R5-225416 |
China Telecom | 38.523-2 16.12.0 CR#259 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.5 |
revised | [WTS] [JSN] |
R5-225046 | Corrections to test case 10.4 |
CR revised to R5-225444 |
MediaTek Inc. | 34.229-5 16.3.0 CR#459 catF | 5GS_NR_LTE-UEConTest, TEI15_Test | Rel-16 |
R5-96-e AI: 6.6.6.5 |
revised | [WTS] [JSN] |
R5-225047 | Removal of brackets for DCI format for Tx test cases |
CR revised to R5-225801 |
Ericsson | 38.521-3 17.5.0 CR#1439 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-225048 | Update of test case 8.1.7.1.1 | CR | MediaTek Inc. | 38.523-1 16.12.0 CR#3187 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
withdrawn | [WTS] [JSN] |
R5-225049 | 34123-1 Correct mobile originated short message |
CR revised to R5-225286 |
OPPO | 34.123-1 15.6.0 CR#3938 catF | TEI8_Test | Rel-15 |
R5-96-e AI: 6.6.4.1 |
revised | [WTS] [JSN] |
R5-225050 | Update of test case 9.1.10.6 |
CR revised to R5-225408 |
MediaTek Inc. | 38.523-1 16.12.0 CR#3188 catF | TEI16_Test, eNS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.7 |
revised | [WTS] [JSN] |
R5-225051 | WP - WI UE Conformance - Inter-system mobility test cases between untrusted Non-3GPP and 3GPP system | Work Plan | China Telecom | TEI15_Test |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-225052 | 38523-1 correction of Back-off timer value in the test procedure of 10.1.3.2 | CR | OPPO Beijing | 38.523-1 16.12.0 CR#3189 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.8.2 |
agreed | [WTS] [JSN] |
R5-225053 | Discussion paper about NSSAA test case 9.1.10.4 | discussion | MediaTek Inc. | eNS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.7 |
withdrawn | [WTS] [JSN] | |
R5-225054 | 38523-1 correction to test case 8.1.2.1.1 |
CR revised to R5-225382 |
OPPO | 38.523-1 16.12.0 CR#3190 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.2 |
revised | [WTS] [JSN] |
R5-225055 | Addition of 4Rx ICS Capability to FDD band n8 | CR | China Unicom | 38.508-2 17.5.0 CR#378 catF | NR_4Rx_Bn8_FWA-UEConTest | Rel-17 |
R5-96-e AI: 5.3.33.2 |
agreed | [WTS] [JSN] |
R5-225056 | 38523-1 correction on pre-test conditions of test case 6.1.1.1 |
CR revised to R5-225374 |
OPPO | 38.523-1 16.12.0 CR#3191 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
revised | [WTS] [JSN] |
R5-225057 | Update of test case 11.4.5 |
CR revised to R5-225411 |
MediaTek Inc. | 38.523-1 16.12.0 CR#3192 catF | 5GS_NR_LTE-UEConTest, TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.4.11.4 |
revised | [WTS] [JSN] |
R5-225058 | Addtion of 4Rx for FDD band n8 into TC 7.3.2 | CR | China Unicom | 38.521-1 17.5.0 CR#1873 catF | NR_4Rx_Bn8_FWA-UEConTest | Rel-17 |
R5-96-e AI: 5.3.33.3.2 |
agreed | [WTS] [JSN] |
R5-225059 | Discussion on SUL in RedCap WI | discussion | Ericsson, Nokia, Qualcomm | NR_redcap_plus_ARCH-UEConTest |
R5-96-e AI: 5.3.31. |
noted | [WTS] [JSN] | ||
R5-225060 | Addition of test case for RRC downlink segmentation |
CR revised to R5-225385 |
MediaTek Inc. | 38.523-1 16.12.0 CR#3193 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.4.4.1.5 |
revised | [WTS] [JSN] |
R5-225061 | 51.010-1 Correct Typo in SMS mobile originated test step |
CR revised to R5-225288 |
OPPO | 51.010-1 13.13.0 CR#5167 catF | TEI8_Test | Rel-13 |
R5-96-e AI: 6.6.8.1 |
revised | [WTS] [JSN] |
R5-225062 | Introducing FR2 signal test frequencies for intra-band contiguous 3CA |
CR revised to R5-225367 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2548 catF | TEI16_Test, NR_IioT-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.4 |
revised | [WTS] [JSN] |
R5-225063 | Update MOP PC2 testing for CA_n41A-n79A | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1874 catF | NR_PC2_CA_R17_2BDL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.21.3.1 |
agreed | [WTS] [JSN] |
R5-225064 | Updating test configurations for SUL test cases | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1875 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225065 | Updating test point selection criteria for FR1 SUL test cases | CR | Huawei, Hisilicon | 38.905 17.5.0 CR#670 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-225066 | Updating Additional emission test cases for NS_xxU |
CR revised to R5-225789 |
Huawei, Hisilicon | 38.521-1 17.5.0 CR#1876 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
revised | [WTS] [JSN] |
R5-225067 | Updating the values for IE P-Max |
CR revised to R5-225365 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#2549 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.2 |
revised | [WTS] [JSN] |
R5-225068 | Correction to AMPR test requirement for NS_04 | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1877 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225069 | Updating structure of clause 6.3C.3 Transmit ON/OFF time mask for SUL | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1878 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225070 | Updating TT in Annex F for R15 time mask test cases | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1879 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.3 |
agreed | [WTS] [JSN] |
R5-225071 | Updating test case 6.3.3.2 General ON/OFF time mask | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1880 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225072 | Updating AMPR for NS_47 PC2 almost contiguous RB allocation testing | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1881 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.3.1 |
agreed | [WTS] [JSN] |
R5-225073 | Adding ON/OFF time mask for Tx Uplink switching testing for SUL |
CR revised to R5-225721 |
Huawei, Hisilicon | 38.521-1 17.5.0 CR#1882 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.1 |
revised | [WTS] [JSN] |
R5-225074 | Adding TP analysis for new FR1 test case 6.3C.3.2 | CR | Huawei, Hisilicon | 38.905 17.5.0 CR#671 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.8 |
agreed | [WTS] [JSN] |
R5-225075 | Updating test case 6.3A.3.1_1 Time mask for switching between two uplink carriers |
CR revised to R5-225722 |
Huawei, Hisilicon | 38.521-1 17.5.0 CR#1883 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.1 |
revised | [WTS] [JSN] |
R5-225076 | Updating TP analysis for FR1 test case 6.3A.3.1_1 | CR | Huawei, Hisilicon | 38.905 17.5.0 CR#672 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.8 |
agreed | [WTS] [JSN] |
R5-225077 | Adding new test condition and applicability for new test case 6.3C.3.2 | CR | Huawei, Hisilicon | 38.522 17.5.0 CR#209 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.5 |
agreed | [WTS] [JSN] |
R5-225078 | Updating MU and TT in Annex F for several time mask test cases | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1884 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.3 |
agreed | [WTS] [JSN] |
R5-225079 | Updating Occupied bandwidth for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1885 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-225080 | Updating Occupied bandwidth for UL MIMO for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1886 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-225081 | Updating SRS time mask test case for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1887 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-225082 | Updating Spectrum Emission Mask for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1888 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-225083 | Updating Absolute power tolerance for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1889 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-225084 | Updating Absolute power tolerance for UL MIMO for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1890 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-225085 | Updating Relative power tolerance for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1891 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-225086 | Updating Relative power tolerance for UL MIMO for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1892 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-225087 | Adding new clause 6.1I for RedCap UE testing |
CR revised to R5-225653 |
Huawei, Hisilicon | 38.521-1 17.5.0 CR#1893 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.3.1 |
revised | [WTS] [JSN] |
R5-225088 | Removal of RedCap test cases | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1894 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.3.1 |
withdrawn | [WTS] [JSN] |
R5-225089 | Adding new test case MOP for SUL with UL MIMO | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1895 catF | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.27.2.1 |
agreed | [WTS] [JSN] |
R5-225090 | Adding applicability for new SUL and UL MIMO test cases |
CR revised to R5-225755 |
Huawei, Hisilicon | 38.522 17.5.0 CR#210 catF | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.27.3 |
revised | [WTS] [JSN] |
R5-225091 | Adding MU and TT for new SUL and UL MIMO test case | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1896 catF | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.27.2.3 |
agreed | [WTS] [JSN] |
R5-225092 | Adding new connection diagram for SUL with UL MIMO test case | CR | Huawei, Hisilicon | 38.508-1 17.5.0 CR#2550 catF | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.27.1.4 |
agreed | [WTS] [JSN] |
R5-225093 | WP of New Rel-17 NR licensed bands and extension of existing NR bands | Work Plan | Huawei, Hisilicon | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225094 | SR of New Rel-17 NR licensed bands and extension of existing NR bands | WI status report | Huawei, Hisilicon | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225095 | WP of Rel-17 NR CA and DC; and NR and LTE DC Configurations | Work Plan | Huawei, Hisilicon | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225096 | SR of Rel-17 NR CA and DC; and NR and LTE DC Configurations | WI status report | Huawei, Hisilicon | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225097 | WP of Additional NR bands for UL-MIMO in Rel-17 | Work Plan | Huawei, Hisilicon | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225098 | SR of Additional NR bands for UL-MIMO in Rel-17 | WI status report | Huawei, Hisilicon | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225099 | WP of FR2 FWA UE with maximum TRP of 23dBm for band n257 and n258 | Work Plan | Huawei, Hisilicon | NR_FR2_FWA_Bn257_Bn258-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225100 | SR of FR2 FWA UE with maximum TRP of 23dBm for band n257 and n258 | WI status report | Huawei, Hisilicon | NR_FR2_FWA_Bn257_Bn258-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225101 | Revised WID on UE Conformance - Additional NR bands for UL-MIMO in Rel-17 |
WID revised revised to R5-225446 |
Huawei, Hisilicon | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
revised | [WTS] [JSN] | |
R5-225102 | SR UE Conformance – UE power saving enhancements for NR | WI status report | MediaTek Inc. | NR_UE_pow_sav_enh_plus_CT-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225103 | WP UE Conformance – UE power saving enhancements for NR | Work Plan | MediaTek Inc. | NR_UE_pow_sav_enh_plus_CT-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225104 | On additional spurious emission for EN-DC with FR2 | discussion | ROHDE & SCHWARZ | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225105 | Addition of new test case additional spurious for FR2 |
CR revised to R5-225881 |
ROHDE & SCHWARZ | 38.521-3 17.5.0 CR#1440 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-225106 | Addition of test case for additional spurious for FR2 |
CR revised to R5-225882 |
ROHDE & SCHWARZ | 38.522 17.5.0 CR#211 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.8 |
revised | [WTS] [JSN] |
R5-225107 | Update of spurious emissions test cases | CR | ROHDE & SCHWARZ | 38.521-2 16.12.0 CR#794 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225108 | Editorial correction for DC_1A_n5A | CR | ROHDE & SCHWARZ | 38.905 17.5.0 CR#673 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-225109 | Update of test frequencies for CA_46C | CR | ROHDE & SCHWARZ | 36.508 17.2.0 CR#1398 catF | TEI14_Test, LTE_CA_R14-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.1 |
agreed | [WTS] [JSN] |
R5-225110 | Correction of aperiodicTriggeringOffset | CR | ROHDE & SCHWARZ | 38.521-4 16.12.0 CR#573 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-225111 | Correction of reference sensitivity test case |
CR revised to R5-225808 |
ROHDE & SCHWARZ | 38.521-3 17.5.0 CR#1441 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.2 |
revised | [WTS] [JSN] |
R5-225112 | Correction of spurious emissions test case |
CR revised to R5-225794 |
ROHDE & SCHWARZ | 38.521-2 16.12.0 CR#795 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-225113 | Correction for CA_n41A-n79A | CR | ROHDE & SCHWARZ | 38.521-1 17.5.0 CR#1897 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.1 |
agreed | [WTS] [JSN] |
R5-225114 | Editorial correction of common uplink configuration | CR | ROHDE & SCHWARZ | 38.521-1 17.5.0 CR#1898 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.1 |
agreed | [WTS] [JSN] |
R5-225115 | Correction of UL MIMO A-MPR test case |
CR revised to R5-225790 |
ROHDE & SCHWARZ | 38.521-1 17.5.0 CR#1899 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
revised | [WTS] [JSN] |
R5-225116 | Correction of test case 6.6.3EB.3 | CR | ROHDE & SCHWARZ | 36.521-1 17.3.0 CR#5419 catF | TEI13_Test, LTE_UE_cat_1RX-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.3.1 |
agreed | [WTS] [JSN] |
R5-225117 | Correction of NR-LTE coexistence test cases |
CR revised to R5-225811 |
ROHDE & SCHWARZ | 38.521-4 16.12.0 CR#574 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
revised | [WTS] [JSN] |
R5-225118 | Correction of CQI reporting test cases | CR | ROHDE & SCHWARZ | 38.521-4 16.12.0 CR#575 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-225119 | Clarification of UL RMC in FR1 aperiodic CQI reporting tests |
CR revised to R5-225812 |
ROHDE & SCHWARZ | 38.521-4 16.12.0 CR#576 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
revised | [WTS] [JSN] |
R5-225120 | Update of CA name release mapping | CR | ROHDE & SCHWARZ | 36.521-1 17.3.0 CR#5420 catF | TEI10_Test | Rel-17 |
R5-96-e AI: 5.5.1.3.2 |
agreed | [WTS] [JSN] |
R5-225121 | Update of minimum test time | CR | ROHDE & SCHWARZ | 38.521-4 16.12.0 CR#577 catF | TEI16_Test, NR_DL256QAM_FR2-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.4 |
agreed | [WTS] [JSN] |
R5-225122 | On the feasibility of the PHR method |
discussion revised to R5-225642 |
ROHDE & SCHWARZ | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-225123 | On the MU for FR2 PC1 TRx test cases |
discussion revised to R5-225643 |
ROHDE & SCHWARZ | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-225124 | Revised WID on UE Conformance - 4Rx support for NR band n8 | WID revised | China Unicom | NR_4Rx_Bn8_FWA-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
R5-225125 | Correction to NR5GC RRC test case 8.1.1.2.3 |
CR revised to R5-225381 |
Keysight Technologies UK Ltd | 38.523-1 16.12.0 CR#3194 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.1 |
revised | [WTS] [JSN] |
R5-225126 | WP on ENDC_UE_PC2_R17_NR_TDD-UEConTest for RAN5#96e | Work Plan | China Unicom | ENDC_UE_PC2_R17_NR_TDD-UEConTest |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-225127 | SR on ENDC_UE_PC2_R17_NR_TDD-UEConTest for RAN5#96e | WI status report | China Unicom | ENDC_UE_PC2_R17_NR_TDD-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225128 | Update of RF Baseline Implementation Capabilities for PC2 UE on FDD band | CR | China Unicom | 38.508-1 17.5.0 CR#2551 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.32.2 |
withdrawn | [WTS] [JSN] |
R5-225129 | 38523-1 correction on handover type in test case 8.1.4.4.4 | CR | OPPO | 38.523-1 16.12.0 CR#3195 catF | NR_Mob_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.6.3 |
agreed | [WTS] [JSN] |
R5-225130 | Discussion on small data transmission LS response | discussion | Nokia, Nokia Shanghai Bell | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 5.3.34.6 |
noted | [WTS] [JSN] | |
R5-225131 | Addition of IoT NTN TC NB-IoT / NTN / GEO |
CR revised to R5-225360 |
MediaTek Inc. | 36.523-1 17.2.0 CR#5116 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.3 |
revised | [WTS] [JSN] |
R5-225132 | Addition of IoT NTN TC NB-IoT / NTN / Multi-TAC |
CR revised to R5-225361 |
MediaTek Inc. | 36.523-1 17.2.0 CR#5117 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.3 |
revised | [WTS] [JSN] |
R5-225133 | Addition of IoT NTN TC NB-IoT / NTN / DRX / (UL)HARQ RTT | CR | MediaTek Inc. | 36.523-1 17.2.0 CR#5118 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.3 |
agreed | [WTS] [JSN] |
R5-225134 | Addition of IoT NTN TC NB-IoT / NTN / UE specific TA report / UE specific Koffset | CR | MediaTek Inc. | 36.523-1 17.2.0 CR#5119 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.3 |
agreed | [WTS] [JSN] |
R5-225135 | Addition of IoT NTN TC NB-IoT / NTN / AM RLC / Receiver status triggers / extended t-Reordering configured | CR | MediaTek Inc. | 36.523-1 17.2.0 CR#5120 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.3 |
agreed | [WTS] [JSN] |
R5-225136 | FR2 RRM test cases: Known Issue List |
discussion revised to R5-225677 |
Ericsson | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-225137 | Test Tolerances for Intra-frequency SS-RSRP measurement accuracy tests in FR2 | CR | Ericsson | 38.903 16.12.0 CR#367 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225138 | Test Tolerances for SSB based L1-RSRP measurement accuracy tests in FR2 |
CR revised to R5-225637 |
Ericsson | 38.903 16.12.0 CR#368 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-225139 | Test Tolerances for FR2 CSI-RS based L1-RSRPSS-RSRP measurement accuracy tests in FR2 |
CR revised to R5-225638 |
Ericsson | 38.903 16.12.0 CR#369 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
revised | [WTS] [JSN] |
R5-225140 | Test Tolerances for DL Interruptions at switching between two uplink carriers test cases |
CR revised to R5-225612 |
Ericsson | 38.903 16.12.0 CR#370 catF | NR_RF_FR1-UEConTest | Rel-16 |
R5-96-e AI: 5.3.5.7 |
revised | [WTS] [JSN] |
R5-225141 | Correction of ENDC FR2 SS-RSRP measurement accuracy test case 5.7.1.1 |
CR revised to R5-225818 |
Ericsson | 38.533 17.3.1 CR#1931 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
revised | [WTS] [JSN] |
R5-225142 | Correction of ENDC FR2-FR2 SS-RSRP measurement accuracy test case 5.7.1.2 including Test Tolerance |
CR revised to R5-225850 |
Ericsson | 38.533 17.3.1 CR#1932 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
revised | [WTS] [JSN] |
R5-225143 | Correction of ENDC FR2 SSB based L1-RSRP measurement accuracy test case 5.7.4.1 including Test Tolerance |
CR revised to R5-225631 |
Ericsson | 38.533 17.3.1 CR#1933 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
revised | [WTS] [JSN] |
R5-225144 | Correction of ENDC FR2 CSI-RS based L1-RSRP measurement accuracy test case 5.7.4.2 including Test Tolerance |
CR revised to R5-225632 |
Ericsson | 38.533 17.3.1 CR#1934 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
revised | [WTS] [JSN] |
R5-225145 | Correction of the measurement accuracy test cases in Annex F | CR | Ericsson | 38.533 17.3.1 CR#1935 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
agreed | [WTS] [JSN] |
R5-225146 | Correction of UL switching test case 6.5.7.1 including Test Tolerance | CR | Ericsson | 38.533 17.3.1 CR#1936 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.6 |
agreed | [WTS] [JSN] |
R5-225147 | Correction of UL switching test case 6.5.7.2 including Test Tolerance | CR | Ericsson | 38.533 17.3.1 CR#1937 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.6 |
agreed | [WTS] [JSN] |
R5-225148 | Addition of Test Tolerance for UL switching test cases in Annex F of TS 38.533 | CR | Ericsson | 38.533 17.3.1 CR#1938 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.6 |
agreed | [WTS] [JSN] |
R5-225149 | Correction of SA FR2-FR2 SS-RSRP measurement accuracy test case 7.7.1.2 including Test Tolerance | CR | Ericsson | 38.533 17.3.1 CR#1939 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
agreed | [WTS] [JSN] |
R5-225150 | Correction of SA FR2 SSB based L1-RSRP measurement accuracy test case 7.7.4.1 including Test Tolerance |
CR revised to R5-225633 |
Ericsson | 38.533 17.3.1 CR#1940 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
revised | [WTS] [JSN] |
R5-225151 | Correction of SA FR2 CSI-RS based L1-RSRP measurement accuracy test case 7.7.4.2 including Test Tolerance |
CR revised to R5-225634 |
Ericsson | 38.533 17.3.1 CR#1941 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
revised | [WTS] [JSN] |
R5-225152 | Correction of NR SA FR1 SA Idle mode CA/DC measurement for FR1 test case 6.6.9.1 | CR | Ericsson | 38.533 17.3.1 CR#1942 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.5 |
agreed | [WTS] [JSN] |
R5-225153 | Correction of Idle Mode inter-RAT CA/DC Measurements test case 6.6.15.1 | CR | Ericsson | 38.533 17.3.1 CR#1943 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.5 |
agreed | [WTS] [JSN] |
R5-225154 | Addition of E-UTRA - NR FR1 Early Measurement Reporting 8.2.2.1 test case | CR | Ericsson | 38.533 17.3.1 CR#1944 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.5 |
agreed | [WTS] [JSN] |
R5-225155 | Addition of E-UTRA - NR FR2 Early Measurement Reporting 8.2.2.2 test case |
CR revised to R5-225748 |
Ericsson | 38.533 17.3.1 CR#1945 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.5 |
revised | [WTS] [JSN] |
R5-225156 | Editorial Correction of 5 DL CA Event Triggered Reporting on Deactivated SCell test case 8.16.92 | CR | Ericsson | 36.521-3 16.13.0 CR#2653 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-225157 | Correction of 6 DL CA Event Triggered Reporting on Deactivated SCell test case 8.16.96 | CR | Ericsson | 36.521-3 16.13.0 CR#2654 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-225158 | Correction of 6 DL CA Activation and Deactivation of Known SCell Test Case 8.16.97 | CR | Ericsson | 36.521-3 16.13.0 CR#2655 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-225159 | Correction of 6 DL CA Activation and Deactivation of Unknown SCell Test Case 8.16.98 | CR | Ericsson | 36.521-3 16.13.0 CR#2656 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-225160 | Correction of 7 DL CA Event Triggered Reporting on Deactivated SCell Test Case 8.16.100 | CR | Ericsson | 36.521-3 16.13.0 CR#2657 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-225161 | Correction of 7 DL CA Activation and Deactivation of Known SCell Test Case 8.16.101 | CR | Ericsson | 36.521-3 16.13.0 CR#2658 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-225162 | Correction of 7 DL CA Activation and Deactivation of Unknown SCell Test Case 8.16.102 | CR | Ericsson | 36.521-3 16.13.0 CR#2659 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-225163 | Correction of Cell Configuration in Annex E for 6 and 7 DL CA test cases | CR | Ericsson | 36.521-3 16.13.0 CR#2660 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-225164 | Correction of MTSU and TT in Annex F for 6 and 7 DL CA test cases | CR | Ericsson | 36.521-3 16.13.0 CR#2661 catF | LTE_CA_R15-UEConTest | Rel-16 |
R5-96-e AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-225165 | Addition of IoT NTN TC NB-IoT / NTN / Ephemeris information update / T317 Expiry / T318 Expiry | CR | MediaTek Inc. | 36.523-1 17.2.0 CR#5121 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.3 |
agreed | [WTS] [JSN] |
R5-225166 | Addition of IoT NTN TC NB-IoT / NTN / GNSS position reporting / reject cause #78 "PLMN not allowed to operate at the present UE location" | CR | MediaTek Inc. | 36.523-1 17.2.0 CR#5122 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.3 |
agreed | [WTS] [JSN] |
R5-225167 | Correction to NR testcase 6.3.1.3 |
CR revised to R5-225375 |
ROHDE & SCHWARZ, Qualcomm | 38.523-1 16.12.0 CR#3196 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
revised | [WTS] [JSN] |
R5-225168 | Updating ACLR for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1900 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.1 |
agreed | [WTS] [JSN] |
R5-225169 | Updating Maximum input level for UL MIMO for 45MHz CBW | CR | Huawei, Hisilicon | 38.521-1 17.5.0 CR#1901 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.2 |
agreed | [WTS] [JSN] |
R5-225170 | Apllicability for SUL test cases | CR | Ericsson, Nokia | 38.522 17.5.0 CR#212 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 4.5.1 |
not pursued | [WTS] [JSN] |
R5-225171 | 38523-1 power level adjustment in test case 8.1.4.4.3 | CR | OPPO | 38.523-1 16.12.0 CR#3197 catF | NR_Mob_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.6.3 |
agreed | [WTS] [JSN] |
R5-225172 | New RedCap test case 8.1.3.4.1 |
CR revised to R5-225348 |
Ericsson | 38.523-1 16.12.0 CR#3198 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
revised | [WTS] [JSN] |
R5-225173 | New RedCap test case 11.7.2 | CR | Ericsson | 38.523-1 16.12.0 CR#3199 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
agreed | [WTS] [JSN] |
R5-225174 | Applicabilities for new RedCap test cases | CR | Ericsson | 38.523-2 16.12.0 CR#260 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.4 |
agreed | [WTS] [JSN] |
R5-225175 | Updates to test case 7.4a | CR | Ericsson | 34.229-5 16.3.0 CR#460 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
withdrawn | [WTS] [JSN] |
R5-225176 | New test procedure 4.9.15a | CR | Ericsson | 38.508-1 17.5.0 CR#2552 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
withdrawn | [WTS] [JSN] |
R5-225177 | Introduction of new default 5GMM messages | CR | Ericsson | 38.508-1 17.5.0 CR#2553 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
agreed | [WTS] [JSN] |
R5-225178 | Introduction of new default 5GSM messages | CR | Ericsson | 38.508-1 17.5.0 CR#2554 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
agreed | [WTS] [JSN] |
R5-225179 | Updates to default 5GMM messages |
CR revised to R5-225271 |
Ericsson, China Telecom | 38.508-1 17.5.0 CR#2555 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
revised | [WTS] [JSN] |
R5-225180 | Updates to default 5GSM messages | CR | Ericsson | 38.508-1 17.5.0 CR#2556 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
agreed | [WTS] [JSN] |
R5-225181 | Alignment of MOP test case 6.2B.1.3 with TS 38.101-3 for for Rel-15 EN-DC TDD-TDD configurations and PC2 | CR | Ericsson | 38.521-3 17.5.0 CR#1442 catF | TEI16_Test, ENDC_UE_PC2_TDD_TDD-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
withdrawn | [WTS] [JSN] |
R5-225182 | Alignment of MOP test case 6.2B.1.3 with TS 38.101-3 for Rel-16 EN-DC FDD-TDD configurations and PC2 | CR | Ericsson | 38.521-3 17.5.0 CR#1443 catF | TEI16_Test, ENDC_UE_PC2_FDD_TDD-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
withdrawn | [WTS] [JSN] |
R5-225183 | Alignment of MOP test case 6.2B.1.3 with TS 38.101-3 for Rel-17 EN-DC FDD-TDD configurations and PC2 | CR | Ericsson | 38.521-3 17.5.0 CR#1444 catF | ENDC_UE_PC2_R17_NR_TDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.16.3.1 |
withdrawn | [WTS] [JSN] |
R5-225184 | Correction to NR testcase 6.3.1.5 |
CR revised to R5-225376 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#3200 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
revised | [WTS] [JSN] |
R5-225185 | On 40cm QoQZ and XPD MUs |
discussion revised to R5-225644 |
Keysight Technologies UK Ltd | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-225186 | WF for RedCap UE testing of SUL |
discussion revised to R5-225621 |
Huawei, HiSilicon, China Unicom, China Telecom, China Mobile | Rel-17 |
R5-96-e AI: 4.5.1 |
revised | [WTS] [JSN] | ||
R5-225187 | Addition of PICS for CLI test cases | CR | Qualcomm Technologies Int | 38.508-2 17.5.0 CR#379 catF | NR_CLI-UEConTest | Rel-17 |
R5-96-e AI: 5.3.10.2 |
agreed | [WTS] [JSN] |
R5-225188 | CR to Correct Permitted Methodologies and Applicability | CR | Keysight Technologies UK Ltd | 38.508-1 17.5.0 CR#2557 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-225189 | Update PICS for RedCap UE |
CR revised to R5-225767 |
Huawei, HiSilicon | 38.508-2 17.5.0 CR#380 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.2 |
revised | [WTS] [JSN] |
R5-225190 | Correction to 5G IMS applicability C19 | CR | Bureau Veritas, CATT | 34.229-2 16.3.0 CR#315 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.2 |
agreed | [WTS] [JSN] |
R5-225191 | New method for preventing SCell drop in RAN5 FR2 UL CA test cases |
discussion revised to R5-225613 |
Ericsson | TEI15_Test |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-225192 | Update to FR2 CA MPR test case 6.2A.2.1 to prevent SCell drop by using UE PHR |
CR revised to R5-225843 |
Ericsson | 38.521-2 16.12.0 CR#796 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-225193 | Introduction of new UE ICS for UPLF test mode |
CR revised to R5-225840 |
Ericsson | 38.508-2 17.5.0 CR#381 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.2 |
revised | [WTS] [JSN] |
R5-225194 | Discussion on TT and testability for FR2 EVM |
discussion revised to R5-225645 |
Ericsson | TEI15_Test |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-225195 | Introduction of test section for UL MIMO EN-DC MPR with FR1 and FR2 |
CR revised to R5-225802 |
Ericsson | 38.521-3 16.8.0 CR#1445 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-225196 | Introduction of test section for UL MIMO EN-DC A-MPR with FR1 and FR2 |
CR revised to R5-225803 |
Ericsson | 38.521-3 16.8.0 CR#1446 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-225197 | Introduction of test tase for UL MIMO EN-DC MPR in FR2 |
CR revised to R5-225804 |
Ericsson | 38.521-3 16.8.0 CR#1447 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-225198 | Introduction of test tase for UL MIMO EN-DC A-MPR in FR2 |
CR revised to R5-225805 |
Ericsson | 38.521-3 16.8.0 CR#1448 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-225199 | Updates to test case 8.1.1.4.4 | CR | Ericsson | 38.523-1 16.12.0 CR#3201 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.18.3 |
agreed | [WTS] [JSN] |
R5-225200 | Updates to test case 8.1.1.4.7 | CR | Ericsson | 38.523-1 16.12.0 CR#3202 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.18.3 |
agreed | [WTS] [JSN] |
R5-225201 | NG.114 MNO provisioning |
discussion revised to R5-225274 |
Ericsson | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.6 |
revised | [WTS] [JSN] | |
R5-225202 | Test Tolerances for EN-DC FR2 SRS-RSRP measurement accuracy | CR | Qualcomm Technologies Int | 38.903 16.12.0 CR#371 catF | NR_CLI-UEConTest | Rel-16 |
R5-96-e AI: 5.3.10.5 |
withdrawn | [WTS] [JSN] |
R5-225203 | Discussion on handling p-MaxEUTRA and p-NR-FR1 | discussion | Huawei, HiSilicon | Rel-15 |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225204 | Removal of PC1.5 n41 from TC 6.2.3 A-MPR |
CR revision of R5-224397 |
T-Mobile USA Inc. | 38.521-1 17.5.0 CR#18071 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
withdrawn | [WTS] [JSN] |
R5-225205 | CR to update validation test frequencies and sub-ranges | CR | Keysight Technologies UK Ltd | 38.521-2 16.12.0 CR#797 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
agreed | [WTS] [JSN] |
R5-225206 | Discussion on QoQZ and XPD MUs for 40cm |
discussion revised to R5-225646 |
ROHDE & SCHWARZ | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
revised | [WTS] [JSN] | ||
R5-225207 | Update on initial condition to avoid Activate Test Mode in TR 37.901-5 | CR | Keysight Technologies UK Ltd | 37.901-5 16.8.0 CR#32 catF | TEI15_Test, FS_UE_5GNR_App_Data_Perf | Rel-16 |
R5-96-e AI: 5.6.17 |
agreed | [WTS] [JSN] |
R5-225208 | Update CQI report periodicity for TDD FR1 periodic wideband CQI reporting under fading conditions | CR | Keysight Technologies UK Ltd | 38.521-4 16.12.0 CR#578 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-225209 | Corrections for FDD Power Saving test cases |
CR revised to R5-225726 |
Keysight Technologies UK Ltd | 38.521-4 16.12.0 CR#579 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.3.1 |
revised | [WTS] [JSN] |
R5-225210 | Corrections to Reference Sensitivity for CA | CR | ROHDE & SCHWARZ | 36.521-1 17.3.0 CR#5421 catF | TEI13_Test, LTE_CA_Rel13-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.3.2 |
agreed | [WTS] [JSN] |
R5-225211 | Corrections for TDD Power Saving test cases |
CR revised to R5-225727 |
Keysight Technologies UK Ltd | 38.521-4 16.12.0 CR#580 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.3.1 |
revised | [WTS] [JSN] |
R5-225212 | Update nrofRB for 200 MHz ChBw 120 kHz SCS | CR | Keysight Technologies UK Ltd | 38.508-1 17.5.0 CR#2558 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.2 |
agreed | [WTS] [JSN] |
R5-225213 | Update on number of HARQ processes for FDD RRM test cases | CR | Keysight Technologies UK Ltd | 38.533 17.3.1 CR#1946 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
agreed | [WTS] [JSN] |
R5-225214 | Initial work plan for NR FR1 TRP TRS WID |
discussion revised to R5-225652 |
Apple Portugal | NR_FR1_TRP_TRS-UEConTest | Rel-17 |
R5-96-e AI: 5.3.46.2 |
revised | [WTS] [JSN] | |
R5-225215 | Update number of HARQ processes for RRM test cases | CR | Keysight Technologies UK Ltd | 38.508-1 17.5.0 CR#2559 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-225216 | Clarification on SFTD delay in 4.7.5.1 |
CR revised to R5-225817 |
Keysight Technologies UK Ltd | 38.533 17.3.1 CR#1947 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
revised | [WTS] [JSN] |
R5-225217 | Clarification on SFTD delay in 8.5.1.1 |
CR revised to R5-225823 |
Keysight Technologies UK Ltd | 38.533 17.3.1 CR#1948 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.6 |
revised | [WTS] [JSN] |
R5-225218 | Updates on 5.7.4.1 test procedure and test requirements |
CR revised to R5-225819 |
Keysight Technologies UK Ltd | 38.533 17.3.1 CR#1949 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
revised | [WTS] [JSN] |
R5-225219 | Corrections to Interruptions at SCell addition/release RRM tests |
CR revised to R5-225824 |
Apple Portugal | 38.533 17.3.1 CR#1950 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.6 |
revised | [WTS] [JSN] |
R5-225220 | On achievable improvements of permitted methods | discussion | Keysight technologies UK Ltd | FS_FR2_enhTestMethods |
R5-96-e AI: 5.3.50.1 |
noted | [WTS] [JSN] | ||
R5-225221 | On PC1 measurement uncertainties for other test cases | discussion | Keysight technologies UK Ltd | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225222 | Update of FR2 test requirements requiring relaxations | discussion | Keysight technologies UK Ltd | FS_FR2_enhTestMethods |
R5-96-e AI: 5.3.50.1 |
noted | [WTS] [JSN] | ||
R5-225223 | Addition of new test case 6.2.2_1 for FR2 MPR enhancements |
CR revised to R5-225607 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#798 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.1 |
revised | [WTS] [JSN] |
R5-225224 | P-MaxUE-FR1-r15 correction for PC2 ENDC test cases |
CR revised to R5-225806 |
Keysight technologies UK Ltd | 38.521-3 17.5.0 CR#1449 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
revised | [WTS] [JSN] |
R5-225225 | Correction to applicable notes to band n8 and n38 in table 4.3.1.0C-1 | CR | Keysight Technologies UK Ltd | 38.508-1 17.5.0 CR#2560 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.1 |
withdrawn | [WTS] [JSN] |
R5-225226 | Introduction of test frequencies for CA_n258I | CR | Keysight Technologies UK Ltd | 38.508-1 17.5.0 CR#2561 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.1 |
withdrawn | [WTS] [JSN] |
R5-225227 | Extension of test function approach to limit Pcell Power in some FR2 UL CA tests |
CR revised to R5-225844 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#799 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-225228 | Updates on 5.7.4.2 test procedure and test requirements |
CR revised to R5-225820 |
Keysight Technologies UK Ltd | 38.533 17.3.1 CR#1951 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
revised | [WTS] [JSN] |
R5-225229 | Discussion on L1-RSRP measurement accuracy test cases | discussion | Keysight Technologies UK Ltd | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | |
R5-225230 | Update 6.1.1.3 test procedure | CR | Keysight Technologies UK Ltd | 38.533 17.3.1 CR#1952 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
agreed | [WTS] [JSN] |
R5-225231 | Update on 6.1.1.7 to align with TS 38.133 | CR | Keysight Technologies UK Ltd | 38.533 17.3.1 CR#1953 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
withdrawn | [WTS] [JSN] |
R5-225232 | Updated TP analysis MPR for CA in FR2 |
CR revised to R5-225832 |
Ericsson | 38.905 17.5.0 CR#674 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 5.4.16 |
revised | [WTS] [JSN] |
R5-225233 | Typos correction in 7.6.1.2 test parameters table | CR | Keysight Technologies UK Ltd | 38.533 17.3.1 CR#1954 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
withdrawn | [WTS] [JSN] |
R5-225234 | Updated Test points in FR2 CA MPR test case |
CR revised to R5-225795 |
Ericsson France S.A.S | 38.521-2 16.12.0 CR#800 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 5.4.5.1 |
revised | [WTS] [JSN] |
R5-225235 | Updates to Enhanced Beam Correspondence Test Case | CR | Apple Portugal | 38.521-2 16.12.0 CR#801 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.1 |
withdrawn | [WTS] [JSN] |
R5-225236 | Correction to NR CAG testcase 6.5.2.2 |
CR revised to R5-225306 |
ROHDE & SCHWARZ, Huawei, Hisilicon | 38.523-1 16.12.0 CR#3203 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
revised | [WTS] [JSN] |
R5-225237 | WF on RedCap RF testing | discussion | Huawei, HiSilicon, CMCC | NR_redcap_plus_ARCH-UEConTest |
R5-96-e AI: 5.3.31. |
noted | [WTS] [JSN] | ||
R5-225238 | SR - UE Conformance - Introduction of DL 1024QAM for NR frequency range 1 | WI status report | Qualcomm | NR_DL1024QAM_FR1 | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225239 | SR - UE Conformance - Further enhancements on MIMO for NR | WI status report | Samsung | NR_feMIMO-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225240 | SR - UE Conformance - NR support for high speed train scenario in frequency range 2 | WI status report | Samsung | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225242 | Update of RF Baseline Implementation Capabilities for PC2 UE on FDD band | CR | China Unicom | 38.508-2 17.5.0 CR#382 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.32.2 |
agreed | [WTS] [JSN] |
R5-225243 | Addition of PICS for RRC DL segmentation |
CR revised to R5-225371 |
MediaTek Inc. | 38.508-2 17.5.0 CR#383 catF | TEI16_Test | Rel-17 |
R5-96-e AI: 6.4.2 |
revised | [WTS] [JSN] |
R5-225244 | Addition of new test case for RRC DL segmentation |
CR revised to R5-225417 |
MediaTek Inc. | 38.523-2 16.12.0 CR#261 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.5 |
revised | [WTS] [JSN] |
R5-225245 | Update test case 11.1.3a | CR | Ericsson | 38.523-1 16.12.0 CR#3204 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.1 |
agreed | [WTS] [JSN] |
R5-225246 | Correction to the test case 8.1.4.2.1.2 | CR | Rohde & Schwarz | 38.523-1 16.12.0 CR#3205 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.4.4.1.4 |
agreed | [WTS] [JSN] |
R5-225247 | Update to Annex E and F for eMIMO test cases |
CR revised to R5-225725 |
Huawei, HiSilicon | 38.533 17.3.1 CR#1955 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
revised | [WTS] [JSN] |
R5-225248 | General updates for chapter 5 requirements for additional Rel-16 CA combos | CR | Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.521-1 17.5.0 CR#1903 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.3 |
withdrawn | [WTS] [JSN] |
R5-225249 | MCC TF160 Status Report |
report revision of R5-223929 |
MCC TF160 |
R5-96-e AI: 7.5 |
approved | [WTS] [JSN] | |||
R5-225250 | UE Conformance Test Aspects for NR Positioning Enhancements |
WID new revision of R5-224024 |
CATT, CAICT |
R5-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] | |||
R5-225251 | New WID on UE Conformance – Access Traffic Steering, Switch and Splitting support for NR |
WID new revision of R5-224098 |
China Telecom,CATT,ZTE | Rel-16 |
R5-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] | ||
R5-225252 | New WID on UE Conformance – Further enhancements of NR RF requirements for frequency range 2 (FR2) |
WID new revision of R5-224146 |
Nokia, Nokia Shanghai Bell, Apple | Rel-17 |
R5-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] | ||
R5-225253 | New WID on UE Conformance - NR QoE management and optimizations for diverse services |
WID new revision of R5-224197 |
Ericsson | Rel-17 |
R5-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] | ||
R5-225254 | New WID Enhancement for the 5G Control Plane Steering of Roaming for UE in Connected mode |
WID new revision of R5-224431 |
NTT DOCOMO INC. | Rel-17 |
R5-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] | ||
R5-225255 | New WID on Conformance Test Aspects - Protocol enhancements for Mission Critical Services for Rel-16 |
WID new revision of R5-224496 |
NIST | Rel-16 |
R5-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] | ||
R5-225256 | New WID on UE Conformance - User Plane Integrity Protection support for EPC connected architectures |
WID new revision of R5-224761 |
Vodafone GmbH | Rel-17 |
R5-96-e AI: 7.4.1 |
agreed | [WTS] [JSN] | ||
R5-225257 | New WID on UE Conformance - Multiple Input Multiple Output (MIMO) Over-the-Air (OTA) requirements for NR UEs |
WID new revision of R5-224908 |
Apple, CAICT, Keysight | Rel-17 |
R5-96-e AI: 7.4.1 |
postponed | [WTS] [JSN] | ||
R5-225258 | Corrections to IMS session timer test case 22.7 | CR | MCC TF160 | 34.229-1 16.2.0 CR#1506 catF | TEI8_Test | Rel-16 |
R5-96-e AI: 6.6.6.1 |
agreed | [WTS] [JSN] |
R5-225259 | Correction to annexure A.2.3 and A.3.1 | CR | Keysight Technologies UK | 34.229-1 16.2.0 CR#1507 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.1 |
agreed | [WTS] [JSN] |
R5-225260 | Addition of new test case 11.3.10 for access category 9 on Access identitiy 0 | CR | NTT DOCOMO INC. | 38.523-1 16.12.0 CR#3206 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
agreed | [WTS] [JSN] |
R5-225261 | Addition of applicability for new testcase 11.3.10 | CR | NTT DOCOMO INC. | 38.523-2 16.12.0 CR#262 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-225262 | Addition of new test case 11.3.10 for access category 3 and 7 on Access identitiy 0 |
CR revision of R5-224433 |
NTT DOCOMO INC. | 38.523-1 16.12.0 CR#30871 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
withdrawn | [WTS] [JSN] |
R5-225263 | Addition of new test case 11.3.11 for access category 3 and 7 and 9 on Access identitiy 0 |
CR revision of R5-224434 |
NTT DOCOMO INC. | 38.523-1 16.12.0 CR#30881 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
withdrawn | [WTS] [JSN] |
R5-225264 | Proposal for new IMS test cases related to Unified Access Control |
discussion revision of R5-224432 |
NTT DOCOMO INC. | Rel-16 |
R5-96-e AI: 6.4.4.11.3 |
noted | [WTS] [JSN] | ||
R5-225265 | Corrections to USSI test case 15.30 | CR | Qualcomm Incorporated | 34.229-1 16.2.0 CR#1508 catF | TEI12_Test | Rel-16 |
R5-96-e AI: 6.6.6.1 |
agreed | [WTS] [JSN] |
R5-225266 | Corrections to USSI test case 8.40 | CR | Qualcomm Incorporated | 34.229-5 16.3.0 CR#461 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225267 | Updates on UE Power Limit Messages: Option 1 |
CR revision of R5-224092 |
Keysight technologies UK Ltd, Apple Portugal | 38.508-1 17.5.0 CR#24271 catF | TEI16_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
withdrawn | [WTS] [JSN] |
R5-225268 | Summary of offline discussion on RedCapUE testing of SUL | discussion | Huawei |
R5-96-e AI: 5.3.31. |
noted | [WTS] [JSN] | |||
R5-225269 | Discussion on handling of PRD21 v120 |
discussion revision of R5-224229 |
CMCC, Ericsson, Huawei, Hisilicon, Keysight |
R5-96-e AI: 7.3.4 |
noted | [WTS] [JSN] | |||
R5-225270 | Editorial correction for Table A.4.3.7-1 and Table A.4.4-2 |
CR revision of R5-224237 |
CAICT, TTA | 38.508-2 17.5.0 CR#3581 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-225271 | Updates to default 5GMM messages |
CR revision of R5-225179 |
Ericsson, China Telecom | 38.508-1 17.5.0 CR#25551 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
agreed | [WTS] [JSN] |
R5-225272 | 3GPP RAN5 PRD19 v1.4.0: Generic work plan template |
other revision of R5-224009 |
Ericsson |
R5-96-e AI: 4.3 |
approved | [WTS] [JSN] | |||
R5-225273 | Discussion paper on legacy test cases adjustment for Redcap |
discussion revision of R5-224700 |
Huawei, Hisilicon | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.6 |
noted | [WTS] [JSN] | |
R5-225274 | NG.114 MNO provisioning |
discussion revision of R5-225201 |
Ericsson | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.6 |
noted | [WTS] [JSN] | |
R5-225275 | Correction of KMS Request URIs in HTTP POST |
CR revision of R5-224970 |
Motorola Solutions Poland | 36.579-1 15.6.0 CR#2711 catF | TEI14_Test, MCImp-UEConTest | Rel-15 |
R5-96-e AI: 6.6.9.1 |
agreed | [WTS] [JSN] |
R5-225276 | Update of NR Multi-SIM default NAS messages and IEs |
CR revision of R5-224100 |
China Telecom | 38.508-1 17.5.0 CR#24301 catF | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 6.3.20.1 |
withdrawn | [WTS] [JSN] |
R5-225277 | Addition of message contents values for SDT in CG-SDT-Configuration-r17 |
CR revision of R5-224333 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#24541 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
withdrawn | [WTS] [JSN] |
R5-225278 | Update to Table 4.6.4-49 to add SDT in UE-NR-Capability |
CR revision of R5-224334 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#24551 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
withdrawn | [WTS] [JSN] |
R5-225279 | Reply LS on the feasibility of testing UE initiated SDT data transmission in RRC_INACTIVE |
LS out LS is reply to R5-223918/R4-2210621 LS To: TSG WG RAN4 |
TSG WG RAN5 |
R5-96-e AI: 7.5 |
postponed | [WTS] [JSN] | |||
R5-225280 | Add Default configuration for DCI format 4_0 scheduling MBS Broadcast test |
CR revision of R5-224739 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#24941 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
agreed | [WTS] [JSN] |
R5-225281 | Correction to NR testcases 8.1.5.7.1.1, 8.1.5.7.1.2 and 8.1.5.7.1.3 |
CR revision of R5-224196 |
ROHDE & SCHWARZ, MCC TF160 | 38.523-1 16.12.0 CR#30571 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.5 |
agreed | [WTS] [JSN] |
R5-225282 | Correction to NR5GC RRC test case 8.2.2.1.1 |
CR revision of R5-224654 |
Starpoint | 38.523-1 16.12.0 CR#31441 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-225283 | Editorial Corrections for TC 9.1.2.6 |
CR revision of R5-224351 |
Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#30731 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.2 |
agreed | [WTS] [JSN] |
R5-225284 | Correction to NR IMS TC 8.18-Barring of All Incoming Calls except for a Specific User |
CR revision of R5-224674 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4471 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225285 | Corrections to A.2.5 UPDATE | CR | MCC TF160 | 34.229-1 16.2.0 CR#1509 catF | TEI8_Test | Rel-16 |
R5-96-e AI: 6.6.6.1 |
agreed | [WTS] [JSN] |
R5-225286 | 34123-1 Correct mobile originated short message |
CR revision of R5-225049 |
OPPO | 34.123-1 15.6.0 CR#39381 catF | TEI8_Test | Rel-15 |
R5-96-e AI: 6.6.4.1 |
withdrawn | [WTS] [JSN] |
R5-225287 | LS on UE conformance testing for RedCap UE on SUL band |
LS out LS To: TSG RAN |
TSG WG RAN5 | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 7.5 |
postponed | [WTS] [JSN] | |
R5-225288 | 51.010-1 Correct Typo in SMS mobile originated test step |
CR revision of R5-225061 |
OPPO | 51.010-1 13.13.0 CR#51671 catF | TEI8_Test | Rel-13 |
R5-96-e AI: 6.6.8.1 |
withdrawn | [WTS] [JSN] |
R5-225289 | Correction to NR5GC MAC test case 7.1.1.3.2b |
CR revision of R5-224661 |
Starpoint | 38.523-1 16.12.0 CR#31451 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
withdrawn | [WTS] [JSN] |
R5-225290 | Correction of NR SL message contents |
CR revision of R5-224556 |
Huawei, HiSilicon | 38.508-1 17.5.0 CR#24711 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 6.3.7.1 |
agreed | [WTS] [JSN] |
R5-225291 | Correction of test procedure 4.9.31 - Connectivity check |
CR revision of R5-224557 |
Huawei, HiSilicon | 38.508-1 17.5.0 CR#24721 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 6.3.7.1 |
agreed | [WTS] [JSN] |
R5-225292 | Update of TC 13.2.5- PC5 unicast / link identifier update |
CR revision of R5-224579 |
TDIA, CATT | 38.523-1 16.12.0 CR#31281 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-225293 | Update of TC 12.2.3.2- Inter-carrier concurrent operation / Measurement configuration and reporting via Uu RRC / CBR measurement reporting / Periodical reporting |
CR revision of R5-224580 |
TDIA, CATT | 38.523-1 16.12.0 CR#31291 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-225294 | Correction of NR V2X test case 12.1.6.3 |
CR revision of R5-224922 |
Lenovo | 38.523-1 16.12.0 CR#31751 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-225295 | Correction of NR V2X test case 13.2.4 |
CR revision of R5-224923 |
Lenovo | 38.523-1 16.12.0 CR#31761 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-225296 | Addition of applicability for NR SL SIG TCs |
CR revision of R5-224569 |
Huawei, HiSilicon | 38.523-2 16.12.0 CR#2491 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.5 |
agreed | [WTS] [JSN] |
R5-225297 | Correction of test cases 7.1.1.12.4 |
CR revision of R5-224413 |
CATT | 38.523-1 16.12.0 CR#30861 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 6.3.9.4 |
agreed | [WTS] [JSN] |
R5-225298 | Correction of test applicability for TC 7.1.1.12.4.x |
CR revision of R5-224417 |
CATT | 38.523-2 16.12.0 CR#2431 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 6.3.9.5 |
agreed | [WTS] [JSN] |
R5-225299 | Updates to Table 4.6.3-16: CellAccessRelatedInfo for NPN |
CR revision of R5-224326 |
Qualcomm CDMA Technologies, Anritsu | 38.508-1 17.5.0 CR#24481 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.1 |
agreed | [WTS] [JSN] |
R5-225300 | Addition of Test Environment for legacy test cases applicable to SNPN Only UE |
CR revision of R5-224336 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#24561 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.1 |
agreed | [WTS] [JSN] |
R5-225301 | Addition of PICS for "SNPN Only" UE |
CR revision of R5-224335 |
Qualcomm CDMA Technologies | 38.508-2 17.5.0 CR#3631 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-17 |
R5-96-e AI: 6.3.10.2 |
agreed | [WTS] [JSN] |
R5-225302 | Correction to Idle Mode Test Case to enable SNPN Only UE |
CR revision of R5-224337 |
Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#30641 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-225303 | Correction to SNPN TC 6.5.1.2 |
CR revision of R5-224339 |
Qualcomm CDMA Technologies, Anritsu | 38.523-1 16.12.0 CR#30651 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-225304 | Correction to NR 5GC CAG testcase 8.1.7.1.1 |
CR revision of R5-224346 |
Qualcomm CDMA Technologies, Anritsu, MediaTek Inc. | 38.523-1 16.12.0 CR#30691 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-225305 | Correction to NR CAG testcase 6.5.2.1 |
CR revision of R5-224385 |
ROHDE & SCHWARZ, Mediatek | 38.523-1 16.12.0 CR#30821 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-225306 | Correction to NR CAG testcase 6.5.2.2 |
CR revision of R5-225236 |
ROHDE & SCHWARZ, Huawei, Hisilicon | 38.523-1 16.12.0 CR#32031 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-225307 | Correction to NR CAG testcase 6.5.2.6 |
CR revision of R5-224390 |
ROHDE & SCHWARZ, Huawei, Hisilicon, MediaTek | 38.523-1 16.12.0 CR#30851 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-225308 | Correction of NR SNPN test case 10.1.7.1 |
CR revision of R5-224924 |
Lenovo | 38.523-1 16.12.0 CR#31771 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.3 |
agreed | [WTS] [JSN] |
R5-225309 | Addition of legacy test cases applicable to SNPN Only UE |
CR revision of R5-224338 |
Qualcomm CDMA Technologies | 38.523-2 16.12.0 CR#2401 catF | NG_RAN_PRN_Vertical_LAN-UEConTest | Rel-16 |
R5-96-e AI: 6.3.10.4 |
agreed | [WTS] [JSN] |
R5-225310 | Update of protocol applicability for DC_19A_n77(2A), DC_19A_n78(2A), DC_21A_n77(2A) and DC_21A_n78(2A) |
CR revision of R5-224964 |
Ericsson | 38.508-1 17.5.0 CR#25441 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-225311 | Correction of the scheduling information for combination NR-15 |
CR revision of R5-224399 |
CATT | 38.508-1 17.5.0 CR#24621 catF | NR_pos-UEConTest | Rel-17 |
R5-96-e AI: 6.3.14.1 |
agreed | [WTS] [JSN] |
R5-225312 | Addition of message contents for DedicatedSIBRequest |
CR revision of R5-224400 |
CATT | 38.508-1 17.5.0 CR#24631 catF | NR_pos-UEConTest | Rel-17 |
R5-96-e AI: 6.3.14.1 |
agreed | [WTS] [JSN] |
R5-225313 | Correction to LPP Provide Capabilities template for subclause 9 test cases |
CR revision of R5-224382 |
ROHDE & SCHWARZ | 37.571-2 16.12.0 CR#1611 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.5 |
agreed | [WTS] [JSN] |
R5-225314 | Addition of on-demand PosSIB followed by location information transfer in RRC_connected state |
CR revision of R5-224408 |
CATT | 37.571-2 16.12.0 CR#1641 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.5 |
agreed | [WTS] [JSN] |
R5-225315 | Addition of pics for testing LTE positioning methods on NR |
CR revision of R5-224379 |
ROHDE & SCHWARZ | 37.571-3 16.12.0 CR#1551 catB | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 6.3.14.6 |
agreed | [WTS] [JSN] |
R5-225316 | Update default message contents of RACH-ConfigDedicated |
CR revision of R5-224069 |
ZTE Corporation | 38.508-1 17.5.0 CR#24251 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.15.1 |
agreed | [WTS] [JSN] |
R5-225317 | Update 2-step RACH test case 7.1.1.1.7 |
CR revision of R5-224066 |
ZTE Corporation | 38.523-1 16.12.0 CR#30381 catF | NR_2step_RACH-UEConTest | Rel-16 |
R5-96-e AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-225318 | Update 2-step RACH test case 7.1.1.1.8 |
CR revision of R5-224067 |
ZTE Corporation | 38.523-1 16.12.0 CR#30391 catF | NR_2step_RACH-UEConTest | Rel-16 |
R5-96-e AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-225319 | Update 2-step RACH test case 7.1.1.1.10 |
CR revision of R5-224068 |
ZTE Corporation | 38.523-1 16.12.0 CR#30401 catF | NR_2step_RACH-UEConTest | Rel-16 |
R5-96-e AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-225320 | Addition of NR EIEI test case 11.5.4 |
CR revision of R5-224441 |
Qualcomm France | 38.523-1 16.12.0 CR#30901 catF | NR_EIEI-UEConTest | Rel-16 |
R5-96-e AI: 6.3.16.3 |
agreed | [WTS] [JSN] |
R5-225321 | Update IE LBT FailureRecoveryConfig |
CR revision of R5-224910 |
Qualcomm France | 38.508-1 17.5.0 CR#25361 catF | NR_unlic-UEConTest | Rel-17 |
R5-96-e AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-225322 | Addition of Applicability of new NR-NR Dual Connectivity test case |
CR revision of R5-224930 |
Lenovo | 38.523-2 16.12.0 CR#2571 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-16 |
R5-96-e AI: 6.3.18.4 |
agreed | [WTS] [JSN] |
R5-225323 | Update RRC UE capability for PC1.5 duty cycle |
CR revision of R5-224210 |
CMCC | 38.523-1 16.12.0 CR#30621 catF | LTE_NR_B41_Bn41_PC29dBm-UEConTest | Rel-16 |
R5-96-e AI: 6.3.19.1 |
agreed | [WTS] [JSN] |
R5-225324 | Update of LTE Multi-SIM default NAS messages and IEs |
CR revision of R5-224099 |
China Telecom | 36.508 17.2.0 CR#13911 catF | LTE_NR_MUSIM_plus_CT1-UEConTest | Rel-17 |
R5-96-e AI: 6.3.20.6 |
agreed | [WTS] [JSN] |
R5-225325 | Add test procedures for MBS Multicast test |
CR revision of R5-224742 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#24971 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
agreed | [WTS] [JSN] |
R5-225326 | Add SIB20 for MBS Broadcast test |
CR revision of R5-224747 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#25021 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
agreed | [WTS] [JSN] |
R5-225327 | Add SIB21 for MBS Broadcast test |
CR revision of R5-224748 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#25031 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
agreed | [WTS] [JSN] |
R5-225328 | Add MBSBroadcastConfiguration for MBS Broadcast test |
CR revision of R5-224749 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#25041 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
agreed | [WTS] [JSN] |
R5-225329 | Add MBSInterestIndication for MBS Broadcast test |
CR revision of R5-224750 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#25051 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
agreed | [WTS] [JSN] |
R5-225330 | Add MBS information elements for MBS test |
CR revision of R5-224751 |
Huawei, Hisilicon, Ericsson | 38.508-1 17.5.0 CR#25061 catF | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.1 |
agreed | [WTS] [JSN] |
R5-225331 | Add Loop back mode C related description for MBS |
CR revision of R5-224752 |
Huawei, Hisilicon | 38.509 17.0.0 CR#701 catB | NR_MBS_5MBS_5MBUSA-UEConTest | Rel-17 |
R5-96-e AI: 6.3.21.3 |
agreed | [WTS] [JSN] |
R5-225332 | Add applicability for Msg3 repetition protocol test case |
CR revision of R5-224268 |
China Telecom | 38.523-2 16.12.0 CR#2391 catF | NR_cov_enh-UEConTest | Rel-17 |
R5-96-e AI: 6.3.22.4 |
agreed | [WTS] [JSN] |
R5-225333 | Update of MDT message and information element |
CR revision of R5-224601 |
CMCC | 38.508-1 17.5.0 CR#24751 catF | NR_ENDC_SON_MDT_enh-UEConTest | Rel-17 |
R5-96-e AI: 6.3.23.1 |
agreed | [WTS] [JSN] |
R5-225335 | Addition of new test case 10.1.8.1- NASC / PDU session establishment reject / Maximum number of PDU sessions reached / Back-off timer is neither zero nor deactivated |
CR revision of R5-224584 |
TDIA, CATT | 38.523-1 16.12.0 CR#31331 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.3 |
agreed | [WTS] [JSN] |
R5-225336 | Addition of new test case 10.1.8.2- NASC / PDU session establishment reject / Maximum number of PDU sessions reached / Back-off timer is deactivated |
CR revision of R5-224586 |
TDIA, CATT | 38.523-1 16.12.0 CR#31351 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.3 |
agreed | [WTS] [JSN] |
R5-225337 | Addition of new test case 10.1.8.3-NASC / PDU session establishment reject / Maximum number of PDU sessions reached / Back-off timer is zero or not included |
CR revision of R5-224587 |
TDIA, CATT | 38.523-1 16.12.0 CR#31361 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.3 |
agreed | [WTS] [JSN] |
R5-225338 | Addition of new eNS Ph2 test case 9.1.12.1 |
CR revision of R5-224588 |
CMCC | 38.523-1 16.12.0 CR#31371 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.3 |
agreed | [WTS] [JSN] |
R5-225339 | Addition of new eNS Ph2 test case 9.1.12.2 |
CR revision of R5-224589 |
CMCC | 38.523-1 16.12.0 CR#31381 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.3 |
agreed | [WTS] [JSN] |
R5-225340 | Addition of new eNS Test Case for NSAC Initial registration rejected |
CR revision of R5-224926 |
Lenovo | 38.523-1 16.12.0 CR#31781 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.3 |
agreed | [WTS] [JSN] |
R5-225341 | Addition of applicability of new eNS Test Case for NSAC Initial registration rejected |
CR revision of R5-224973 |
Lenovo | 38.523-2 16.12.0 CR#2581 catF | eNS_Ph2-UEConTest | Rel-17 |
R5-96-e AI: 6.3.24.4 |
agreed | [WTS] [JSN] |
R5-225342 | Addition of RedCap default test channel bandwidth for signaling MFBI test |
CR revision of R5-224726 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#24921 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.1 |
agreed | [WTS] [JSN] |
R5-225343 | Addition of RedCap default test channel bandwidth for signaling test |
CR revision of R5-224727 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#24931 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.1 |
agreed | [WTS] [JSN] |
R5-225344 | Addition of RedCap TC 7.1.1.8.3 - Separate BWP |
CR revision of R5-224698 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#31521 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
agreed | [WTS] [JSN] |
R5-225345 | Addition of RedCap TC 7.1.1.1.16 - MSG3 identification on CCCH1 |
CR revision of R5-224699 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#31531 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
agreed | [WTS] [JSN] |
R5-225346 | Addition of RedCap TC 6.1.2.26 - Cell Selection |
CR revision of R5-224737 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#31711 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
agreed | [WTS] [JSN] |
R5-225347 | Addition of RedCap TC 7.1.1.1.17 - Msg1-based UE identification |
CR revision of R5-224738 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#31721 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
agreed | [WTS] [JSN] |
R5-225348 | New RedCap test case 8.1.3.4.1 |
CR revision of R5-225172 |
Ericsson | 38.523-1 16.12.0 CR#31981 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.3 |
agreed | [WTS] [JSN] |
R5-225349 | RedCap UE Test applicability for Legacy test cases |
CR revision of R5-224696 |
Huawei, Hisilicon | 38.523-2 16.12.0 CR#2531 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.4 |
not pursued | [WTS] [JSN] |
R5-225350 | RedCap UE Test applicability for new test cases |
CR revision of R5-224697 |
Huawei, Hisilicon | 38.523-2 16.12.0 CR#2541 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 6.3.25.4 |
agreed | [WTS] [JSN] |
R5-225352 | Update of Table 4.6.1-30 to add message contents values for SDT in UEAssistanceInformation |
CR revision of R5-224327 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#24491 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
agreed | [WTS] [JSN] |
R5-225353 | Update of Table 4.6.1-28 to add message contents values for SDT in SIB1 |
CR revision of R5-224328 |
Qualcomm CDMA Technologies, Huawei, Hisilicon | 38.508-1 17.5.0 CR#24501 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
agreed | [WTS] [JSN] |
R5-225354 | Update of Table 4.6.1-16 to add message contents values for SDT in RRCRelease |
CR revision of R5-224329 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#24511 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
agreed | [WTS] [JSN] |
R5-225355 | Update of Table 4.6.3-96 to add message contents values for SDT in PDCCH-ConfigCommon |
CR revision of R5-224332 |
Qualcomm CDMA Technologies | 38.508-1 17.5.0 CR#24531 catF | NR_SmallData_INACTIVE-UEConTest | Rel-17 |
R5-96-e AI: 6.3.26.1 |
agreed | [WTS] [JSN] |
R5-225356 | Addition of SIB16 for slice based cell reselection |
CR revision of R5-224591 |
CMCC | 38.508-1 17.5.0 CR#24731 catF | NR_slice-UEConTest | Rel-17 |
R5-96-e AI: 6.3.29.1 |
agreed | [WTS] [JSN] |
R5-225357 | Updates to message contents for slice specific RACH configuration |
CR revision of R5-224592 |
CMCC, Anritsu, Ericsson | 38.508-1 17.5.0 CR#24741 catF | NR_slice-UEConTest | Rel-17 |
R5-96-e AI: 6.3.29.1 |
agreed | [WTS] [JSN] |
R5-225358 | Add UplinkDataCompression into PDCP-Config for NR UDC test |
CR revision of R5-224418 |
CATT | 38.508-1 17.5.0 CR#24641 catF | NR_UDC-UEConTest | Rel-17 |
R5-96-e AI: 6.3.35.1 |
agreed | [WTS] [JSN] |
R5-225359 | Addition of default SIB message content for Rel-17 NTN IoT |
CR revision of R5-225013 |
MediaTek Inc. | 36.508 17.2.0 CR#13971 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.1 |
agreed | [WTS] [JSN] |
R5-225360 | Addition of IoT NTN TC NB-IoT / NTN / GEO |
CR revision of R5-225131 |
MediaTek Inc. | 36.523-1 17.2.0 CR#51161 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.3 |
agreed | [WTS] [JSN] |
R5-225361 | Addition of IoT NTN TC NB-IoT / NTN / Multi-TAC |
CR revision of R5-225132 |
MediaTek Inc. | 36.523-1 17.2.0 CR#51171 catF | LTE_NBIOT_eMTC_NTN_plus_EPS-UEConTest | Rel-17 |
R5-96-e AI: 6.3.37.3 |
agreed | [WTS] [JSN] |
R5-225362 | Updates to test procedures 4.9.12A and 4.9.12B |
CR revision of R5-224659 |
MCC TF160, Huawei, Hisilicon | 38.508-1 17.5.0 CR#24831 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.1 |
agreed | [WTS] [JSN] |
R5-225363 | Add IEs DRX-ConfigSL, EphemerisInfo, FeatureCombination and FeatureCombinationPreambles |
CR revision of R5-224378 |
Ericsson | 38.508-1 17.5.0 CR#24581 catF | TEI17_Test | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-225364 | Editorial update IE RAT-Type |
CR revision of R5-224879 |
Ericsson | 38.508-1 17.5.0 CR#25301 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-225365 | Updating the values for IE P-Max |
CR revision of R5-225067 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#25491 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.2 |
agreed | [WTS] [JSN] |
R5-225366 | Updates on UE Power Limit Messages: Option 2 |
CR revision of R5-224093 |
Keysight technologies UK Ltd, Apple Portugal | 38.508-1 17.5.0 CR#24281 catF | TEI16_Test | Rel-17 |
R5-96-e AI: 6.4.1.3 |
agreed | [WTS] [JSN] |
R5-225367 | Introducing FR2 signal test frequencies for intra-band contiguous 3CA |
CR revision of R5-225062 |
Huawei, Hisilicon | 38.508-1 17.5.0 CR#25481 catF | TEI16_Test, NR_IioT-UEConTest | Rel-17 |
R5-96-e AI: 6.4.1.4 |
agreed | [WTS] [JSN] |
R5-225368 | Addition of MDT PICS for location reporting of inter-RAT measurement |
CR revision of R5-223989 |
MediaTek Inc. | 38.508-2 17.5.0 CR#3521 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-17 |
R5-96-e AI: 6.4.2 |
withdrawn | [WTS] [JSN] |
R5-225369 | Addition of new PICs dl-SchedulingOffset-PDSCH-TypeA |
CR revision of R5-224350 |
Qualcomm CDMA Technologies | 38.508-2 17.5.0 CR#3651 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.2 |
agreed | [WTS] [JSN] |
R5-225370 | Add PICS for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system |
CR revision of R5-224443 |
China Telecom | 38.508-2 17.5.0 CR#3671 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 6.4.2 |
agreed | [WTS] [JSN] |
R5-225371 | Addition of PICS for RRC DL segmentation |
CR revision of R5-225243 |
MediaTek Inc. | 38.508-2 17.5.0 CR#3831 catF | TEI16_Test | Rel-17 |
R5-96-e AI: 6.4.2 |
agreed | [WTS] [JSN] |
R5-225372 | Correction to idle mode test cases (applicable only for FR1 bands) |
CR revision of R5-224481 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#31031 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
agreed | [WTS] [JSN] |
R5-225373 | Correction to NR TC 6.1.2.11 - Area Specific SIBs |
CR revision of R5-224570 |
Huawei, HiSilicon | 38.523-1 16.12.0 CR#31201 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
agreed | [WTS] [JSN] |
R5-225374 | 38523-1 correction on pre-test conditions of test case 6.1.1.1 |
CR revision of R5-225056 |
OPPO | 38.523-1 16.12.0 CR#31911 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
agreed | [WTS] [JSN] |
R5-225375 | Correction to NR testcase 6.3.1.3 |
CR revision of R5-225167 |
ROHDE & SCHWARZ, Qualcomm | 38.523-1 16.12.0 CR#31961 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
agreed | [WTS] [JSN] |
R5-225376 | Correction to NR testcase 6.3.1.5 |
CR revision of R5-225184 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#32001 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.2 |
agreed | [WTS] [JSN] |
R5-225377 | Correction to NR testcase 7.1.1.6.3 |
CR revision of R5-224384 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#30811 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-225378 | Correction to NR TC 7.1.1.6.1 - SPS |
CR revision of R5-224714 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#31551 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.2 |
agreed | [WTS] [JSN] |
R5-225379 | Correction to PDCP test case 7.1.3.5.2 |
CR revision of R5-224453 |
Qualcomm France | 38.523-1 16.12.0 CR#30991 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.3.1.4 |
agreed | [WTS] [JSN] |
R5-225380 | Correction to RRC Connection Management test cases (applicable only for FR1 bands) |
CR revision of R5-224483 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#31051 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.1 |
agreed | [WTS] [JSN] |
R5-225381 | Correction to NR5GC RRC test case 8.1.1.2.3 |
CR revision of R5-225125 |
Keysight Technologies UK Ltd | 38.523-1 16.12.0 CR#31941 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.1 |
agreed | [WTS] [JSN] |
R5-225382 | 38523-1 correction to test case 8.1.2.1.1 |
CR revision of R5-225054 |
OPPO | 38.523-1 16.12.0 CR#31901 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.2 |
agreed | [WTS] [JSN] |
R5-225383 | Correction to RRC Measurement test cases (applicable only for FR1 bands) |
CR revision of R5-224484 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#31061 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.3 |
agreed | [WTS] [JSN] |
R5-225384 | Updates for NR RRC test case 8.1.5.1.1 |
CR revision of R5-223936 |
MCC TF160, Huawei, HiSilicon | 38.523-1 16.12.0 CR#30061 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.5 |
agreed | [WTS] [JSN] |
R5-225385 | Addition of test case for RRC downlink segmentation |
CR revision of R5-225060 |
MediaTek Inc. | 38.523-1 16.12.0 CR#31931 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.4.4.1.5 |
agreed | [WTS] [JSN] |
R5-225386 | Update of NR MDT TC 8.1.6.2.3 |
CR revision of R5-223996 |
MediaTek Inc., Anritsu | 38.523-1 16.12.0 CR#30161 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-225387 | Update of Inter-RAT MDT test cases 8.1.6.2.x |
CR revision of R5-224095 |
MediaTek Inc., MCC TF160 | 38.523-1 16.12.0 CR#30411 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-225388 | Update of Inter-System MDT test cases 8.1.6.3.x |
CR revision of R5-224096 |
MediaTek Inc., MCC TF160 | 38.523-1 16.12.0 CR#30421 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-225389 | Correction to Intra NR MDT test cases 8.1.6.1.x |
CR revision of R5-224376 |
MCC TF160, MediaTek Inc. | 38.523-1 16.12.0 CR#30791 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-225390 | Update of NR MDT test case 8.1.6.1.3.6 |
CR revision of R5-225044 |
MediaTek Inc. | 38.523-1 16.12.0 CR#31861 catF | TEI16_Test, NR_SON_MDT-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.1.6 |
agreed | [WTS] [JSN] |
R5-225391 | Updates for EN-DC RRC test case 8.2.1.1.1 |
CR revision of R5-223937 |
MCC TF160 | 38.523-1 16.12.0 CR#30071 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.1 |
agreed | [WTS] [JSN] |
R5-225392 | Updates for NE-DC RRC test case 8.2.1.1.2 |
CR revision of R5-223938 |
MCC TF160 | 38.523-1 16.12.0 CR#30081 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.1 |
agreed | [WTS] [JSN] |
R5-225393 | New NR-DC RRC Radio Bearer test case 8.2.2.2.2 |
CR revision of R5-224047 |
ZTE Corporation, Tejet, SRTC, Huawei, Hisilicon | 38.523-1 16.12.0 CR#30221 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-225394 | New NE-DC RRC Radio Bearer test case 8.2.2.7.3 |
CR revision of R5-224049 |
ZTE Corporation, Tejet, SRTC | 38.523-1 16.12.0 CR#30241 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-225395 | New NE-DC measurements test case 8.2.3.1.2 |
CR revision of R5-224052 |
ZTE Corporation | 38.523-1 16.12.0 CR#30271 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225396 | New NE-DC measurements test case 8.2.3.2.2 |
CR revision of R5-224055 |
ZTE Corporation | 38.523-1 16.12.0 CR#30301 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225397 | New NE-DC measurements test case 8.2.3.7.2 |
CR revision of R5-224056 |
ZTE Corporation | 38.523-1 16.12.0 CR#30311 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225398 | New NE-DC measurements test case 8.2.3.7.2a |
CR revision of R5-224057 |
ZTE Corporation | 38.523-1 16.12.0 CR#30321 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225399 | New NE-DC measurements test case 8.2.3.7.2b |
CR revision of R5-224058 |
ZTE Corporation | 38.523-1 16.12.0 CR#30331 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225400 | New NE-DC measurements test case 8.2.3.8.2 |
CR revision of R5-224059 |
ZTE Corporation | 38.523-1 16.12.0 CR#30341 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225401 | New NE-DC measurements test case 8.2.3.8.2a |
CR revision of R5-224060 |
ZTE Corporation | 38.523-1 16.12.0 CR#30351 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225402 | New NE-DC measurements test case 8.2.3.8.2b |
CR revision of R5-224061 |
ZTE Corporation | 38.523-1 16.12.0 CR#30361 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225403 | Correction to ENDC Measurement test cases (applicable only for FR1 bands) |
CR revision of R5-224486 |
ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#31081 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225404 | Addition of new NE-DC test case 8.2.3.4.2 |
CR revision of R5-224595 |
CMCC | 38.523-1 16.12.0 CR#31391 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225405 | Addition of new NE-DC test case 8.2.3.5.2 |
CR revision of R5-224596 |
CMCC | 38.523-1 16.12.0 CR#31401 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.3 |
agreed | [WTS] [JSN] |
R5-225406 | Correction to ENDC test cases 8.2.4.2.1.x |
CR revision of R5-224132 |
Keysight Technologies UK | 38.523-1 16.12.0 CR#30501 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.4.2.4 |
agreed | [WTS] [JSN] |
R5-225407 | Editorial update to NR Test case 9.1.6.1.3 |
CR revision of R5-224357 |
Qualcomm CDMA Technologies | 38.523-1 16.12.0 CR#30781 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.3 |
agreed | [WTS] [JSN] |
R5-225408 | Update of test case 9.1.10.6 |
CR revision of R5-225050 |
MediaTek Inc. | 38.523-1 16.12.0 CR#31881 catF | TEI16_Test, eNS-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.5.7 |
agreed | [WTS] [JSN] |
R5-225409 | Correction to NR5GC IRAT test case 11.4.11 |
CR revision of R5-224133 |
Keysight Technologies UK | 38.523-1 16.12.0 CR#30511 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.4 |
agreed | [WTS] [JSN] |
R5-225410 | Correction to NR TC 11.4.5 - Emergency call and forbidden TA |
CR revision of R5-224719 |
Huawei, Hisilicon | 38.523-1 16.12.0 CR#31601 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.4 |
agreed | [WTS] [JSN] |
R5-225411 | Update of test case 11.4.5 |
CR revision of R5-225057 |
MediaTek Inc. | 38.523-1 16.12.0 CR#31921 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.4 |
agreed | [WTS] [JSN] |
R5-225412 | Add new test case 11.8.5 Inter-system mobility between untrusted Non-3GPP and 3GPP system/Handover from 5GS to EPC/ePDG |
CR revision of R5-225039 |
China Telecom | 38.523-1 16.12.0 CR#31831 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.4.11.6 |
agreed | [WTS] [JSN] |
R5-225413 | Update of applicability for CA test case 7.1.1.3.8.x |
CR revision of R5-224001 |
MediaTek Inc. | 38.523-2 16.12.0 CR#2331 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-225414 | Update of 5G-NR test cases applicability |
CR revision of R5-224036 |
Qualcomm France, MCC TF160 | 38.523-2 16.12.0 CR#2361 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-225415 | Addition of applicability of NE-DC RRC test cases |
CR revision of R5-224600 |
CMCC | 38.523-2 16.12.0 CR#2521 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-225416 | Add applicability for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system |
CR revision of R5-225045 revised to R5-225451 |
China Telecom | 38.523-2 16.12.0 CR#2591 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.5 |
revised | [WTS] [JSN] |
R5-225417 | Addition of new test case for RRC DL segmentation |
CR revision of R5-225244 |
MediaTek Inc. | 38.523-2 16.12.0 CR#2611 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-225418 | Routine maintenance for TS 38.523-3 |
CR revision of R5-223939 |
MCC TF160 | 38.523-3 17.3.0 CR#26721 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 6.4.6 |
agreed | [WTS] [JSN] |
R5-225419 | Correction to LTE testcase 8.3.1.13 |
CR revision of R5-224163 |
ROHDE & SCHWARZ | 36.523-1 17.2.0 CR#51061 catF | TEI9_Test | Rel-17 |
R5-96-e AI: 6.5.3.3.3 |
agreed | [WTS] [JSN] |
R5-225420 | Routine maintenance for TS 36.523-3 |
CR revision of R5-223941 |
MCC TF160 | 36.523-3 17.3.0 CR#46791 catF | TEI16_Test | Rel-17 |
R5-96-e AI: 6.5.5 |
agreed | [WTS] [JSN] |
R5-225421 | Correction to A.2.4 PRACK |
CR revision of R5-224193 |
ROHDE & SCHWARZ | 34.229-1 16.2.0 CR#15021 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.1 |
agreed | [WTS] [JSN] |
R5-225422 | Update of applicability for 5GC test case 7.14 and 7.20 |
CR revision of R5-224004 |
MediaTek Inc., SGS Wirelessc | 34.229-2 16.3.0 CR#3131 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.2 |
agreed | [WTS] [JSN] |
R5-225423 | Correction for IMS 5GS Call Control test case 7.21 |
CR revision of R5-224135 |
Keysight Technologies UK | 34.229-5 16.3.0 CR#4291 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225424 | Updates to IMS emergency over 5G test cases 10.1 and 10.2 |
CR revision of R5-224278 |
MCC TF160, Huawei, HiSilicon | 34.229-5 16.3.0 CR#4311 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225425 | Corrections to IMS emergency over 5G test case 10.15 |
CR revision of R5-224279 |
MCC TF160 | 34.229-5 16.3.0 CR#4321 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225426 | Correction to 5GS IMS test case 10.6 |
CR revision of R5-224317 |
ANRITSU LTD | 34.229-5 16.3.0 CR#4331 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225427 | Correction to 5GS IMS test case 7.33 |
CR revision of R5-224389 |
ANRITSU LTD, Google, Keysight | 34.229-5 16.3.0 CR#4341 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225428 | Correction to NR IMS TC 6.1-Initial Registration |
CR revision of R5-224664 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4371 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225429 | Correction to NR IMS TC 6.2-Initial Registration Failures |
CR revision of R5-224665 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4381 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225430 | Correction to NR IMS TC 6.3-Re-Registration Scenarios |
CR revision of R5-224666 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4391 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225431 | Correction to NR IMS TC 6.4-De-Registration Scenarios |
CR revision of R5-224667 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4401 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225432 | Correction to NR IMS TC 6.7-Authentication with MAC Parameter Invalid |
CR revision of R5-224671 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4441 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225433 | Correction to NR IMS TC 6.8-Authentication with SQN out of range |
CR revision of R5-224672 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4451 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225434 | Correction to NR IMS TC 6.9-Subscription with 503 Service Unavailable |
CR revision of R5-224673 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4461 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225435 | Correction to NR IMS TC 7.4a-MTSI MO Voice Call with preconditions at both originating UE and terminating UE |
CR revision of R5-224675 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4481 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225436 | Correction to NR IMS TC 7.4-MTSI MO Voice Call with preconditions at both originating and terminating UE |
CR revision of R5-224676 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4491 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225437 | Correction to NR IMS TC 7.18-MTSI MO Voice Call |
CR revision of R5-224677 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4501 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225438 | Correction to NR IMS TC 7.19-MTSI MT Voice Call |
CR revision of R5-224678 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4511 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225439 | Correction to NR IMS TC 7.24a-MTSI MO Voice Call |
CR revision of R5-224679 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4521 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225440 | Correction to NR IMS TC 7.24b-MTSI MO Voice Call |
CR revision of R5-224680 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4531 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225441 | Correction to NR IMS TC 10.3-Emergency call with emergency registration |
CR revision of R5-224682 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4551 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225442 | Correction to NR IMS TC 10.11-New initial emergency registration |
CR revision of R5-224684 |
Huawei, Hisilicon | 34.229-5 16.3.0 CR#4571 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225443 | Correction to 5GS IMS test case 7.2 |
CR revision of R5-224979 |
ANRITSU LTD, Huawei, HiSilicon, ROHDE & SCHWARZ | 34.229-5 16.3.0 CR#4581 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225444 | Corrections to test case 10.4 |
CR revision of R5-225046 |
MediaTek Inc. | 34.229-5 16.3.0 CR#4591 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.6.6.5 |
agreed | [WTS] [JSN] |
R5-225445 | Revised WID on NR_redcap_plus_ARCH-UEConTest |
WID revised revision of R5-224978 |
China Unicom, Hisilicon, Ericsson, Huawei, Qualcomm | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
R5-225446 | Revised WID on UE Conformance - Additional NR bands for UL-MIMO in Rel-17 |
WID revised revision of R5-225101 |
Huawei, Hisilicon | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
agreed | [WTS] [JSN] | |
R5-225447 | PRD21 CDS: PC3 for CA_n26A-n66(2A)-n70A, CA_n48A-n66A-n71(2A), CA_n48A-n66(2A)-n70A, CA_n48A-n66(2A)-n71A, CA_n48A-n70A-n71(2A), CA_n48B-n66A-n70A, CA_n48B-n66A-n71A, CA_n48B-n70A-n71A, CA_n48(2A)-n66A-n70A, CA_n48(2A)-n66A-n71A, CA_n48(2A)-n66(2A), CA_n48(2A)-n70A-n71A, CA_n48(2A)-n71(2A) | other | WE Certification, DISH Network |
R5-96-e AI: 7.3.4 |
available | [WTS] [JSN] | |||
R5-225448 | Addition of NR SL SIG TC 12.2.7.2 - Concurrent SL CSI reporting |
CR revision of R5-224566 |
Huawei, HiSilicon | 38.523-1 16.12.0 CR#31171 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-225449 | Correction to EPS FB Test case 11.1.2 |
CR revision of R5-224386 |
ANRITSU LTD, Huawei, HiSilicon, ROHDE & SCHWARZ | 38.523-1 16.12.0 CR#30831 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 6.4.4.11.1 |
agreed | [WTS] [JSN] |
R5-225450 | Add new test case 11.8.6 Inter-system mobility between untrusted Non-3GPP and 3GPP system/Handover from EPC/ePDG to 5GS/ UE in 5GMM-DEREGISTERED and EMM-DEREGISTERED states |
CR revision of R5-225042 |
China Telecom | 38.523-1 16.12.0 CR#31841 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.4.11.6 |
withdrawn | [WTS] [JSN] |
R5-225451 | Add applicability for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system |
CR revision of R5-225416 revised to R5-225452 |
China Telecom | 38.523-2 16.12.0 CR#2592 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.5 |
revised | [WTS] [JSN] |
R5-225452 | Add applicability for Rel-15 Inter-system mobility between untrusted Non-3GPP and 3GPP system |
CR revision of R5-225451 |
China Telecom | 38.523-2 16.12.0 CR#2593 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-225453 | WP - UE Conformance - Further enhancements on MIMO for NR | Work Plan | Samsung | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-225454 | WP - UE Conformance - NR support for high speed train scenario in frequency range 2 | Work Plan | Samsung | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-225455 | SR - UE Conformance - Introduction of DL 1024QAM for NR frequency range 1 | WI status report | Qualcomm | NR_DL1024QAM_FR1-UEConTest | Rel-17 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225456 | WP - Enhancements on MIMO for NR |
Work Plan revision of R5-224847 |
Huawei, HiSilicon | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 7.4.2 |
available | [WTS] [JSN] | |
R5-225600 | Discussion on n39 A-MPR PC2 Test Case | discussion | CMCC, Huawei, Hisilicon |
R5-96-e AI: 5.3.25.4 |
noted | [WTS] [JSN] | |||
R5-225601 | Internal Work Plan for FR2 RF Enhanced Test Methods | Work Plan | Apple Portugal |
R5-96-e AI: 5.3.50.1 |
noted | [WTS] [JSN] | |||
R5-225602 | General updates of clause 5 for R16 CADC configurations |
CR revised to R5-225704 |
China Unicom, Verizon, Ericsson, Qualcomm, Apple, China Telecom | 38.521-1 17.5.0 CR#1902 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.3 |
revised | [WTS] [JSN] |
R5-225603 | Rel-16 Addition of new test function to limit Pcell power: Option 1 |
CR revision of R5-224080 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 16.4.0 CR#631 catB | TEI16_Test | Rel-16 |
R5-96-e AI: 5.4.3 |
withdrawn | [WTS] [JSN] |
R5-225604 | Rel-17 Addition of new test function to limit Pcell power: Option 1 |
CR revision of R5-224081 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 17.0.0 CR#641 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.4.3 |
withdrawn | [WTS] [JSN] |
R5-225605 | Rel-16 Correction of SET UL MESSAGES |
CR revision of R5-224082 |
Keysight technologies UK Ltd, Apple Portugal | 36.509 16.2.0 CR#2111 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 5.5.1.2 |
withdrawn | [WTS] [JSN] |
R5-225606 | Rel-17 Correction of SET UL MESSAGES |
CR revision of R5-224083 |
Keysight technologies UK Ltd, Apple Portugal | 36.509 17.0.0 CR#2121 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.5.1.2 |
withdrawn | [WTS] [JSN] |
R5-225607 | Addition of new test case 6.2.2_1 for FR2 MPR enhancements |
CR revision of R5-225223 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#7981 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.1 |
agreed | [WTS] [JSN] |
R5-225608 | Discussion on message type for Power limit test functions |
discussion revision of R5-224078 |
Keysight technologies UK Ltd, Apple Portugal | TEI16_Test |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225609 | RAN5#96-e RF FR2_PCC_SCC_Prio Session meeting minute | report | Keysight Technologies UK Ltd |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | |||
R5-225610 | Rel-16 Extension of test control command message type values reserved for 5GS |
CR revision of R5-224084 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 16.4.0 CR#651 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 5.4.3 |
agreed | [WTS] [JSN] |
R5-225611 | Rel-17 Extension of test control command message type values reserved for 5GS |
CR revision of R5-224085 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 17.0.0 CR#661 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.4.3 |
agreed | [WTS] [JSN] |
R5-225612 | Test Tolerances for DL Interruptions at switching between two uplink carriers test cases |
CR revision of R5-225140 |
Ericsson | 38.903 16.12.0 CR#3701 catF | NR_RF_FR1-UEConTest | Rel-16 |
R5-96-e AI: 5.3.5.7 |
agreed | [WTS] [JSN] |
R5-225613 | New method for preventing SCell drop in RAN5 FR2 UL CA test cases |
discussion revision of R5-225191 |
Ericsson | TEI15_Test |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225614 | Rel-16 Extension of test control command message type values reserved for E-UTRA and NB-IoT |
CR revision of R5-224086 |
Keysight technologies UK Ltd, Apple Portugal | 36.509 16.2.0 CR#2131 catF | TEI16_Test | Rel-16 |
R5-96-e AI: 5.5.1.2 |
agreed | [WTS] [JSN] |
R5-225615 | Rel-17 Extension of test control command message type values reserved for E-UTRA and NB-IoT |
CR revision of R5-224087 |
Keysight technologies UK Ltd, Apple Portugal | 36.509 17.0.0 CR#2141 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.5.1.2 |
agreed | [WTS] [JSN] |
R5-225616 | TT analysis for positioning test case 15.2.1 and 15.2.2 |
CR revision of R5-223983 |
CATT | 38.903 16.12.0 CR#3261 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.6 |
agreed | [WTS] [JSN] |
R5-225617 | Correction to EN-DC FR2 RLM tests for PSCell configured with CSI-RS-based RLM RS in DRX including TT |
CR revision of R5-223927 |
Anritsu | 38.533 17.3.1 CR#18391 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-225618 | Add Test Tolerance analyses for EN-DC FR2 RLM tests for PSCell configured with CSI-RS-based RLM RS in DRX |
CR revision of R5-223928 |
Anritsu | 38.903 16.12.0 CR#3211 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225619 | Correction to connection diagram of spurious emissions |
CR revision of R5-224620 |
Anritsu | 38.521-2 16.12.0 CR#7831 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
withdrawn | [WTS] [JSN] |
R5-225620 | Correction to 7.3.1-15 |
CR revision of R5-224793 |
ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#25101 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.3 |
withdrawn | [WTS] [JSN] |
R5-225621 | WF for RedCap UE testing of SUL |
discussion revision of R5-225186 |
Huawei, HiSilicon, China Unicom, China Telecom, China Mobile | Rel-17 |
R5-96-e AI: 4.5.1 |
noted | [WTS] [JSN] | ||
R5-225622 | Addition of new test case 6.7.9.3.2 NR SA FR1 CSI-RS based CMR and dedicated IMR L1-SINR relative measurement accuracy |
CR revision of R5-224187 |
Sporton | 38.533 17.3.1 CR#18591 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225623 | Completion 7.7.6.2 including TT anaysis results |
CR revision of R5-224189 |
Sporton | 38.533 17.3.1 CR#18611 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225624 | Completion 7.7.6.3 including TT anaysis results |
CR revision of R5-224190 |
Sporton | 38.533 17.3.1 CR#18621 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225625 | Addition of test tolerance analysis for 4.7.7.1.2 and 6.7.9.1.2 FR1 L1-SINR relative measurement accuracy |
CR revision of R5-224103 |
Sporton | 38.903 16.12.0 CR#3291 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225626 | Addition of test tolerance analysis for 7.7.6.2 NR FR2 L1-SINR measurement accuracy test |
CR revision of R5-224107 |
Sporton | 38.903 16.12.0 CR#3331 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225627 | Addition of test tolerance analysis for 7.7.6.3 NR FR2 L1-SINR measurement accuracy test |
CR revision of R5-224108 |
Sporton | 38.903 16.12.0 CR#3341 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225628 | Complete TC 6.3.2.2.3 ncluding TT analysis results |
CR revision of R5-223979 |
ROHDE & SCHWARZ, China Telecom | 38.533 17.3.1 CR#18461 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
agreed | [WTS] [JSN] |
R5-225629 | Complete TC 6.3.2.2.4 ncluding TT analysis results |
CR revision of R5-223980 |
ROHDE & SCHWARZ, China Telecom | 38.533 17.3.1 CR#18471 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.4 |
agreed | [WTS] [JSN] |
R5-225630 | Test Tolerances for FR2 RLM test cases 5.5.1.x |
CR revision of R5-224802 |
Qualcomm Korea | 38.533 17.3.1 CR#19271 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-225631 | Correction of ENDC FR2 SSB based L1-RSRP measurement accuracy test case 5.7.4.1 including Test Tolerance |
CR revision of R5-225143 |
Ericsson | 38.533 17.3.1 CR#19331 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-225632 | Correction of ENDC FR2 CSI-RS based L1-RSRP measurement accuracy test case 5.7.4.2 including Test Tolerance |
CR revision of R5-225144 |
Ericsson | 38.533 17.3.1 CR#19341 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-225633 | Correction of SA FR2 SSB based L1-RSRP measurement accuracy test case 7.7.4.1 including Test Tolerance |
CR revision of R5-225150 |
Ericsson | 38.533 17.3.1 CR#19401 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
agreed | [WTS] [JSN] |
R5-225634 | Correction of SA FR2 CSI-RS based L1-RSRP measurement accuracy test case 7.7.4.2 including Test Tolerance |
CR revision of R5-225151 |
Ericsson | 38.533 17.3.1 CR#19411 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
agreed | [WTS] [JSN] |
R5-225635 | Annex F for 5.7.1.3 and 7.7.1.3 |
CR revision of R5-223967 |
ROHDE & SCHWARZ | 38.533 17.3.1 CR#18431 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
agreed | [WTS] [JSN] |
R5-225636 | TT analysis update for FR2 RLM test cases 5.5.1.x and 7.5.1.x |
CR revision of R5-224803 |
Qualcomm Korea | 38.903 16.12.0 CR#3661 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225637 | Test Tolerances for SSB based L1-RSRP measurement accuracy tests in FR2 |
CR revision of R5-225138 |
Ericsson | 38.903 16.12.0 CR#3681 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225638 | Test Tolerances for FR2 CSI-RS based L1-RSRPSS-RSRP measurement accuracy tests in FR2 |
CR revision of R5-225139 |
Ericsson | 38.903 16.12.0 CR#3691 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225639 | MU discussion on FR2 PC1 |
discussion revision of R5-224610 |
Anritsu, NTT DOCOMO INC. | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225640 | Applicability of FWA devices for Demod and RRM test cases |
discussion revision of R5-224808 |
Qualcomm Korea | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225641 | Handling of FR2 PC1 in RAN5 |
discussion revision of R5-225023 |
NTT DOCOMO INC., Anritsu, Keysight | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225642 | On the feasibility of the PHR method |
discussion revision of R5-225122 |
ROHDE & SCHWARZ | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225643 | On the MU for FR2 PC1 TRx test cases |
discussion revision of R5-225123 |
ROHDE & SCHWARZ | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225644 | On 40cm QoQZ and XPD MUs |
discussion revision of R5-225185 |
Keysight Technologies UK Ltd | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225645 | Discussion on TT and testability for FR2 EVM |
discussion revision of R5-225194 |
Ericsson | TEI15_Test |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225646 | Discussion on QoQZ and XPD MUs for 40cm |
discussion revision of R5-225206 |
ROHDE & SCHWARZ | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225647 | Discussion on Rel-16 Power Boost measurement uncertainties and test tolerances |
discussion revision of R5-224070 |
Keysight technologies UK Ltd | NR_RF_FR2_req_enh-UEConTest |
R5-96-e AI: 5.3.15.8 |
noted | [WTS] [JSN] | ||
R5-225648 | Corrections on spurious emission for UE co-existence limits for inter-band CA configurations |
CR revision of R5-224958 |
ZTE Corporation | 38.521-1 17.5.0 CR#18611 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.1 |
withdrawn | [WTS] [JSN] |
R5-225649 | Corrections on spurious emission for UE co-existence limits for EN-DC configurations |
CR revision of R5-224957 |
ZTE Corporation | 38.521-3 17.5.0 CR#14321 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
withdrawn | [WTS] [JSN] |
R5-225650 | LS to RAN4 on A-MPR regions for NS_50 (Power Class 2) |
LS out LS To: TSG WG RAN4 |
TSG WG RAN5 |
R5-96-e AI: 5.7 |
approved | [WTS] [JSN] | |||
R5-225651 | Discussion on spurious emission for UE co-existence limits in RAN5 |
discussion revision of R5-224956 |
ZTE Corporation | NR_CADC_NR_LTE_DC_R16-UEConTest, NR_CADC_NR_LTE_DC_R17-UEConTest |
R5-96-e AI: 5.3.3.11 |
noted | [WTS] [JSN] | ||
R5-225652 | Initial work plan for NR FR1 TRP TRS WID |
discussion revision of R5-225214 |
Apple Portugal | NR_FR1_TRP_TRS-UEConTest | Rel-17 |
R5-96-e AI: 5.3.46.2 |
noted | [WTS] [JSN] | |
R5-225653 | Adding new clause 6.1I for RedCap UE testing |
CR revision of R5-225087 |
Huawei, Hisilicon | 38.521-1 17.5.0 CR#18931 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.3.1 |
withdrawn | [WTS] [JSN] |
R5-225654 | Update of 7.1I for RedCap UE |
CR revision of R5-224911 |
China Unicom | 38.521-1 17.5.0 CR#18571 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.3.2 |
withdrawn | [WTS] [JSN] |
R5-225655 | Updates to CLI Measurement test case 5.6.4.1, 5.7.5.1, 7.6.4.1 and 7.7.5.1 |
CR revision of R5-224499 |
Qualcomm Technologies Int | 38.533 17.3.1 CR#18751 catF | NR_CLI-UEConTest | Rel-17 |
R5-96-e AI: 5.3.10.4 |
withdrawn | [WTS] [JSN] |
R5-225656 | RF Updates implementing TPMI test method for coherent Ues |
CR revision of R5-224118 |
Keysight technologies UK Ltd | 38.508-1 17.5.0 CR#24321 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-225657 | PC1 MU - General Editor notes update in 38.521-3 FR2 Tx tests |
CR revision of R5-224307 |
Keysight Technologies UK Ltd | 38.521-3 17.5.0 CR#14071 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
withdrawn | [WTS] [JSN] |
R5-225658 | New test case addition: 6.2.4_1 Configured transmitted power with Power Boost |
CR revision of R5-224071 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#7621 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.1 |
agreed | [WTS] [JSN] |
R5-225659 | Enhanced Beam correspondence Measurement Uncertainties and test tolerances |
CR revision of R5-224110 |
Keysight technologies UK Ltd, Apple Portugal | 38.521-2 16.12.0 CR#7651 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.1 |
agreed | [WTS] [JSN] |
R5-225660 | Measurement uncertainties and test tolerances for test case 6.2.4_1 Configured transmitted power with Power Boost |
CR revision of R5-224076 |
Keysight technologies UK Ltd, Apple Hungary Kft. | 38.521-2 16.12.0 CR#7641 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.3 |
agreed | [WTS] [JSN] |
R5-225661 | New test case addition: 6.2B.4.1.4_1 Configured Output Power with Power Boost for Inter-Band EN-DC including FR2 (1 NR CC). |
CR revision of R5-224074 |
Keysight technologies UK Ltd | 38.521-3 17.5.0 CR#13941 catF | NR_RF_FR2_req_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.15.4.1 |
agreed | [WTS] [JSN] |
R5-225662 | Measurement uncertainties and test tolerances for test case 6.2B.4.1.4_1 Configured Output Power with Power Boost for Inter-Band EN-DC including FR2 (1 NR CC) |
CR revision of R5-224077 |
Keysight technologies UK Ltd, Apple Hungary Kft. | 38.521-3 17.5.0 CR#13951 catF | NR_RF_FR2_req_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.15.4.3 |
agreed | [WTS] [JSN] |
R5-225663 | Measurement uncertainties for test case 6.2.4_1 Configured transmitted power with Power Boost |
CR revision of R5-224075 |
Keysight technologies UK Ltd | 38.903 16.12.0 CR#3271 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.6 |
agreed | [WTS] [JSN] |
R5-225664 | PC1 - MU and TT definition for MOP in 38.521-2 |
CR revision of R5-224304 |
Keysight Technologies UK Ltd | 38.521-2 16.12.0 CR#7761 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225665 | PC1 - MU and TT definition for REFSENS in 38.521-2 |
CR revision of R5-224306 |
Keysight Technologies UK Ltd | 38.521-2 16.12.0 CR#7781 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.2 |
agreed | [WTS] [JSN] |
R5-225666 | Updates to Spherical Coverage annexes |
CR revision of R5-224120 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#7671 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
agreed | [WTS] [JSN] |
R5-225667 | Definition of PC1 MU and relaxation |
CR revision of R5-224611 |
Anritsu | 38.521-2 16.12.0 CR#7801 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
agreed | [WTS] [JSN] |
R5-225668 | PC1 MU - General Editor notes update in 38.521-3 FR2 Rx tests |
CR revision of R5-224309 |
Keysight Technologies UK Ltd | 38.521-3 17.5.0 CR#14091 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.2 |
agreed | [WTS] [JSN] |
R5-225669 | Rel-15 Beam correspondence test tolerance definition |
CR revision of R5-224111 |
Keysight technologies UK Ltd | 38.521-3 17.5.0 CR#13961 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.3 |
agreed | [WTS] [JSN] |
R5-225670 | FR2 demod testability update |
CR revision of R5-224807 |
Qualcomm Korea | 38.521-4 16.12.0 CR#5661 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.2 |
agreed | [WTS] [JSN] |
R5-225671 | PC1 MU - definition for MOP in 38.903 |
CR revision of R5-224310 |
Keysight Technologies UK Ltd, Anritsu | 38.903 16.12.0 CR#3351 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225672 | PC1 MU - definition for REFSENS in 38.903 |
CR revision of R5-224311 |
Keysight Technologies UK Ltd, Anritsu | 38.903 16.12.0 CR#3361 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225673 | PC1 MU - General Update in 38.903 section B.2.2 |
CR revision of R5-224312 |
Keysight Technologies UK Ltd | 38.903 16.12.0 CR#3371 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225674 | Definition of PC1 MU |
CR revision of R5-224612 |
Anritsu | 38.903 16.12.0 CR#3591 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225675 | Update FR2 TRx MU in 38.903 |
CR revision of R5-224615 |
Anritsu | 38.903 16.12.0 CR#3601 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225676 | Discussion on handling of MOP with UE capability maxUplinkDutyCycle |
discussion revision of R5-224214 |
CMCC, Huawei, Hisilicon |
R5-96-e AI: 4.5.1 |
noted | [WTS] [JSN] | |||
R5-225677 | FR2 RRM test cases: Known Issue List |
discussion revision of R5-225136 |
Ericsson | TEI15_Test, 5GS_NR_LTE-UEConTest |
R5-96-e AI: 5.4.17 |
noted | [WTS] [JSN] | ||
R5-225678 | Update of FR2 5CC to 8CCs Transmission Test Cases |
CR revision of R5-224371 |
Sporton | 38.521-3 17.5.0 CR#14101 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-225679 | Update of FR2 5 to 8UL CA Test Cases |
CR revision of R5-224370 |
Sporton | 38.521-2 16.12.0 CR#7791 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225680 | Updates related to TPMI test methods |
CR revision of R5-224119 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#7661 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
agreed | [WTS] [JSN] |
R5-225681 | Correction of test channel bandwidth for R16 |
CR revision of R5-224233 |
CAICT | 38.508-1 17.5.0 CR#24411 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.1.1 |
agreed | [WTS] [JSN] |
R5-225682 | Correction of test channel bandwidth for n79 |
CR revision of R5-224234 |
CAICT, Tejet | 38.508-1 17.5.0 CR#24421 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.1 |
agreed | [WTS] [JSN] |
R5-225683 | Update of Refsens TC for RedCap UE in 7.3I |
CR revision of R5-224919 |
China Unicom | 38.521-1 17.5.0 CR#18581 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.3.2 |
agreed | [WTS] [JSN] |
R5-225684 | Correction of test channel bandwidth for R15 |
CR revision of R5-224232 |
CAICT, Keysight Technologies UK Ltd | 38.508-1 17.5.0 CR#24401 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.1 |
agreed | [WTS] [JSN] |
R5-225685 | Update RF Baseline Implementation Capabilities for PC1.5 duty cycle |
CR revision of R5-224209 |
CMCC | 38.508-2 17.5.0 CR#3561 catF | LTE_NR_B41_Bn41_PC29dBm-UEConTest | Rel-17 |
R5-96-e AI: 5.3.22.1 |
agreed | [WTS] [JSN] |
R5-225686 | Update UE capability information elements for PC1.5 duty cycle |
CR revision of R5-224211 |
CMCC | 38.508-1 17.5.0 CR#24391 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.1 |
agreed | [WTS] [JSN] |
R5-225687 | Update test procedure of MOP for TxD |
CR revision of R5-224212 |
CMCC | 38.521-1 17.5.0 CR#17691 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-225688 | Update RF Baseline Implementation Capabilities for PC2 duty cycle |
CR revision of R5-224208 |
CMCC | 38.508-2 17.5.0 CR#3551 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-225689 | Update test procedure of MOP |
CR revision of R5-224213 |
CMCC | 38.521-1 17.5.0 CR#17701 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225690 | Completion 4.7.7.1.1 and 6.7.9.1.1 including TT anaysis results |
CR revision of R5-224181 |
Sporton | 38.533 17.3.1 CR#18531 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225691 | Addition of new test case 6.7.9.1.2 NR SA FR1 CSI-RS based CMR and no dedicated IMR configured and CSI-RS resource set with repetition off L1-SINR relative measurement accuracy |
CR revision of R5-224183 |
Sporton | 38.533 17.3.1 CR#18551 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225692 | Completion 4.7.7.2 and 6.7.9.2 including TT anaysis results |
CR revision of R5-224184 |
Sporton | 38.533 17.3.1 CR#18561 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225693 | Completion 4.7.7.3.1 and 6.7.9.3.1 including TT anaysis results |
CR revision of R5-224185 |
Sporton | 38.533 17.3.1 CR#18571 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225694 | Addition of test tolerance analysis for 4.7.7.1.1 and 6.7.9.1.1 EN-DC FR1 L1-SINR absolute accuracy tests |
CR revision of R5-224102 |
Sporton | 38.903 16.12.0 CR#3281 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225695 | Addition of test tolerance analysis for 4.7.7.2 and 6.7.9.2 FR1 L1-SINR absolute measurement accuracy |
CR revision of R5-224104 |
Sporton | 38.903 16.12.0 CR#3301 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225696 | Addition of test tolerance analysis for 4.7.7.3.1 and 6.7.9.3.1 FR1 L1-SINR absolute measurement accuracy |
CR revision of R5-224105 |
Sporton | 38.903 16.12.0 CR#3311 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225697 | Addition of test tolerance analysis for 4.7.7.3.2 and 6.7.9.3.2 EN-DC FR1 L1-SINR absolute measurement accuracy |
CR revision of R5-224106 |
Sporton | 38.903 16.12.0 CR#3321 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225698 | Correction to UE Rx-TX time difference measurement period test cases 15.2.1 and 15.2.2 |
CR revision of R5-224005 |
CATT | 37.571-1 16.13.0 CR#3801 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-225699 | Correction of clause number for 4UL CA test requirement |
CR revision of R5-224204 |
Ericsson | 36.521-1 17.3.0 CR#54121 catF | LTE_CA_R15-UEConTest | Rel-17 |
R5-96-e AI: 5.3.1.2 |
agreed | [WTS] [JSN] |
R5-225700 | Introduction of DC_3A-7A-20A_n8A for physical layer baseline implementation capabilities |
CR revision of R5-224150 |
Nokia, Nokia Shanghai Bell | 38.508-2 17.5.0 CR#3531 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.2 |
agreed | [WTS] [JSN] |
R5-225701 | Addition of test capability for FR2 EN-DC TX Test Cases 5CC to 7CCs |
CR revision of R5-224375 |
Sporton | 38.508-2 17.5.0 CR#3661 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.2 |
agreed | [WTS] [JSN] |
R5-225702 | Updating Spurious emission for UE co-existence TC for CA_n2-n77, CA_n5-n77, CA_n66-n77 |
CR revision of R5-224359 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.521-1 17.5.0 CR#18051 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.1 |
agreed | [WTS] [JSN] |
R5-225703 | Update Rx Requirements for additional Rel-16 CA combos |
CR revision of R5-224363 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.521-1 17.5.0 CR#18061 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.2 |
agreed | [WTS] [JSN] |
R5-225704 | General updates of clause 5 for R16 CADC configurations |
CR revision of R5-225602 |
China Unicom, Verizon, Ericsson, Qualcomm, Apple, China Telecom | 38.521-1 17.5.0 CR#19021 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.3.3 |
agreed | [WTS] [JSN] |
R5-225705 | Introduction of Output power requirements for DC_3A_n8A |
CR revision of R5-224151 |
Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#13971 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-225706 | Introduction of Spurious emissions band UE co-existence Test description for DC_3A_n8A |
CR revision of R5-224155 |
Nokia, Nokia Shanghai Bell | 38.521-3 17.5.0 CR#14011 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-225707 | Update 6.5B.3.3.2 for DC_5A_n2A |
CR revision of R5-224888 |
Qualcomm Austria RFFE GmbH | 38.521-3 17.5.0 CR#14191 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-225708 | Corrections on test configuration table in spurious emission band UE co-existence for Rel-16 inter-band EN-DC configuration |
CR revision of R5-224937 |
ZTE Corporation | 38.521-3 17.5.0 CR#14241 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.1 |
agreed | [WTS] [JSN] |
R5-225709 | Update for reference sensitivity for DC_48A_n66A |
CR revision of R5-224896 |
Qualcomm Austria RFFE GmbH | 38.521-3 17.5.0 CR#14211 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.5.2 |
agreed | [WTS] [JSN] |
R5-225710 | Addition of test applicability for FR2 EN-DC TX Test Cases 5CC to 8CCs |
CR revision of R5-224368 |
Sporton | 38.522 17.5.0 CR#1971 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3.7 |
agreed | [WTS] [JSN] |
R5-225711 | Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_3A_n8A |
CR revision of R5-224157 |
Nokia, Nokia Shanghai Bell | 38.905 17.5.0 CR#6301 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-225712 | Update TP analysis for Rel-16 CA_n2A_n77A |
CR revision of R5-224360 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.905 17.5.0 CR#6351 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-225713 | Update TP analysis for Rel-16 CA_n5A_n77A |
CR revision of R5-224361 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.905 17.5.0 CR#6361 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-225714 | Update TP analysis for Rel-16 CA_n66A_n77A |
CR revision of R5-224362 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.905 17.5.0 CR#6371 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-225715 | TP analysis for ref sensitivity for Rel-16 NR CA combos |
CR revision of R5-224364 |
Verizon Switzerland AG, Ericsson, Qualcomm, Apple | 38.905 17.5.0 CR#6381 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-225716 | Update Spurious emission TP R16 DC_5A_n2A |
CR revision of R5-224887 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#6501 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.3. |
agreed | [WTS] [JSN] |
R5-225717 | Removing of n89, n91, n92, n93 and n94 from A.4.3.1 |
CR revision of R5-224236 |
CAICT | 38.508-2 17.5.0 CR#3571 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
R5-225718 | Correction to UL Configuration for Band n14 REFSENS |
CR revision of R5-223925 |
AT&T | 38.521-1 17.5.0 CR#17561 catF | NR_bands_BW_R16-UEConTest | Rel-17 |
R5-96-e AI: 5.3.4.3.2 |
agreed | [WTS] [JSN] |
R5-225719 | Applicable NR-ARFCN correction for n259 |
CR revision of R5-224302 |
Keysight Technologies UK Ltd | 38.521-2 16.12.0 CR#7741 catF | NR_bands_BW_R16-UEConTest | Rel-16 |
R5-96-e AI: 5.3.4.4.3 |
agreed | [WTS] [JSN] |
R5-225720 | Update 6.5.3 Spur-emiss R16_17 |
CR revision of R5-224898 |
Qualcomm Austria RFFE GmbH | 38.521-1 17.5.0 CR#18511 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.1 |
agreed | [WTS] [JSN] |
R5-225721 | Adding ON/OFF time mask for Tx Uplink switching testing for SUL |
CR revision of R5-225073 |
Huawei, Hisilicon | 38.521-1 17.5.0 CR#18821 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.1 |
agreed | [WTS] [JSN] |
R5-225722 | Updating test case 6.3A.3.1_1 Time mask for switching between two uplink carriers |
CR revision of R5-225075 |
Huawei, Hisilicon | 38.521-1 17.5.0 CR#18831 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.1 |
agreed | [WTS] [JSN] |
R5-225723 | Correction to CA configuration in 7.4A.2 |
CR revision of R5-224627 |
Anritsu | 38.521-1 17.5.0 CR#18101 catF | NR_RF_FR1-UEConTest | Rel-17 |
R5-96-e AI: 5.3.5.3.2 |
agreed | [WTS] [JSN] |
R5-225724 | Addition of test applicability for eMIMO test cases |
CR revision of R5-224778 |
Huawei, HiSilicon | 38.522 17.5.0 CR#2031 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.7 |
agreed | [WTS] [JSN] |
R5-225725 | Update to Annex E and F for eMIMO test cases |
CR revision of R5-225247 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19551 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225726 | Corrections for FDD Power Saving test cases |
CR revision of R5-225209 |
Keysight Technologies UK Ltd | 38.521-4 16.12.0 CR#5791 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.3.1 |
agreed | [WTS] [JSN] |
R5-225727 | Corrections for TDD Power Saving test cases |
CR revision of R5-225211 |
Keysight Technologies UK Ltd | 38.521-4 16.12.0 CR#5801 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.3.1 |
agreed | [WTS] [JSN] |
R5-225728 | Addition of n8 CBW 35MHz into refsens |
CR revision of R5-224858 |
China Unicom | 38.521-1 17.5.0 CR#18441 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.2 |
agreed | [WTS] [JSN] |
R5-225729 | General updates of clause 5 for R17 new CBW configurations |
CR revision of R5-224287 |
China Unicom, CAICT | 38.521-1 17.5.0 CR#17911 catF | NR_lic_bands_BW_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.12.3.3 |
agreed | [WTS] [JSN] |
R5-225730 | Addition of test frequencies for DC_21A_n28A |
CR revision of R5-224625 |
Anritsu, NTT DOCOMO INC., Ericsson | 38.508-1 17.5.0 CR#24761 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.1.1 |
agreed | [WTS] [JSN] |
R5-225731 | Addition of configurations for many 4CA NR combinations |
CR revision of R5-224868 |
WE Certification Oy, DISH Network | 38.508-1 17.5.0 CR#25271 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.1.1 |
agreed | [WTS] [JSN] |
R5-225732 | Addition of applicability statement for many 4CA NR combinations |
CR revision of R5-224869 |
WE Certification Oy, DISH Network | 38.508-2 17.5.0 CR#3721 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.2 |
agreed | [WTS] [JSN] |
R5-225733 | Addition of TX spurious emissions test points for seven UL CA combinations |
CR revision of R5-224865 |
WE Certification Oy, DISH Network, Ericsson | 38.521-1 17.5.0 CR#18451 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.3.1 |
agreed | [WTS] [JSN] |
R5-225734 | Addition many 4CA NR combinations to reference sensitivity test |
CR revision of R5-224867 |
WE Certification Oy, DISH Network | 38.521-1 17.5.0 CR#18461 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.3.2 |
agreed | [WTS] [JSN] |
R5-225735 | General updates of clause 5 for R17 CADC configurations |
CR revision of R5-225022 |
China Unicom, Nokia, WE Certification | 38.521-1 17.5.0 CR#18681 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.3.3 |
agreed | [WTS] [JSN] |
R5-225736 | Update for reference sensitivity for DC_5A_n77A |
CR revision of R5-224897 |
Qualcomm Austria RFFE GmbH | 38.521-3 17.5.0 CR#14221 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13.5.2 |
agreed | [WTS] [JSN] |
R5-225737 | Tx Spurious emissions test point analysis for many UL CA combos |
CR revision of R5-224866 |
WE Certification Oy, DISH Network, Ericsson | 38.905 17.5.0 CR#6431 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13. |
agreed | [WTS] [JSN] |
R5-225738 | Test point analysis for reference sensitivity for many 4CA combos |
CR revision of R5-224870 |
WE Certification Oy, DISH Network | 38.905 17.5.0 CR#6441 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13. |
agreed | [WTS] [JSN] |
R5-225739 | A-MPR TP analysis for Rel-17 CA_n24-n41 |
CR revision of R5-224871 |
Ligado Networks | 38.905 17.5.0 CR#6451 catF | NR_CADC_NR_LTE_DC_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.13. |
agreed | [WTS] [JSN] |
R5-225740 | Correction of NR RSTD test cases |
CR revision of R5-224402 |
CATT | 37.571-1 16.13.0 CR#3821 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-225741 | Addition of new PRS RSRP measurement accuracy test case 16.3.2 |
CR revision of R5-224405 |
CATT | 37.571-1 16.13.0 CR#3851 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-225742 | Assistance data for TC 14.2.1 and 14.3.1 |
CR revision of R5-223974 |
ROHDE & SCHWARZ | 37.571-5 16.8.0 CR#2161 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.5 |
agreed | [WTS] [JSN] |
R5-225743 | In-band emissions minimum conformance requirements update |
CR revision of R5-224072 |
Keysight technologies UK Ltd, Apple Portugal | 38.521-2 16.12.0 CR#7631 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.1 |
agreed | [WTS] [JSN] |
R5-225744 | Reference sensitivity power level for CA, update on intra-band non-continuous CA |
CR revision of R5-224906 |
Apple Hungary Kft. | 38.521-2 16.12.0 CR#7861 catF | NR_RF_FR2_req_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.3.15.3.2 |
agreed | [WTS] [JSN] |
R5-225745 | Test point analysis for test 6.2.4_1 Configured transmitted power with Power Boost |
CR revision of R5-224073 |
Keysight technologies UK Ltd | 38.905 17.5.0 CR#6291 catF | NR_RF_FR2_req_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.15.7 |
agreed | [WTS] [JSN] |
R5-225746 | Update TP analysis for AMPR NS_05 and NS_05U |
CR revision of R5-224813 |
MediaTek Beijing Inc. | 38.905 17.5.0 CR#6411 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.16.6 |
agreed | [WTS] [JSN] |
R5-225747 | Applicability for 2-step RACH test cases |
CR revision of R5-223982 |
ROHDE & SCHWARZ | 38.522 17.5.0 CR#1911 catF | NR_2step_RACH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.17.3 |
agreed | [WTS] [JSN] |
R5-225748 | Addition of E-UTRA - NR FR2 Early Measurement Reporting 8.2.2.2 test case |
CR revision of R5-225155 |
Ericsson | 38.533 17.3.1 CR#19451 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.5 |
agreed | [WTS] [JSN] |
R5-225749 | Introduction of spurious emission TP analysis for CA_n48A-n70A |
CR revision of R5-224168 |
Nokia, Nokia Shanghai Bell | 38.905 17.5.0 CR#6321 catF | LTE_NR_DC_CA_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.19.8 |
agreed | [WTS] [JSN] |
R5-225750 | Add PC2 test configuration and requirement table for n1 A-MPR |
CR revision of R5-224814 |
MediaTek Beijing Inc. | 38.521-1 17.5.0 CR#18291 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.20.3 |
agreed | [WTS] [JSN] |
R5-225751 | Introduction of REFSENS test requirements for PC2 UL CA_n1A-n78A |
CR revision of R5-224273 |
China Telecom | 38.521-1 17.5.0 CR#17851 catF | NR_SAR_PC2_interB_SUL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.20.3.2 |
agreed | [WTS] [JSN] |
R5-225752 | Update of inter-band CA PC2 test applicability |
CR revision of R5-224275 |
China Telecom | 38.522 17.5.0 CR#1961 catF | NR_SAR_PC2_interB_SUL_2BUL-UEConTest | Rel-17 |
R5-96-e AI: 5.3.20.4 |
agreed | [WTS] [JSN] |
R5-225753 | TxD MPR test requirements for PC 1.5 FWA UEs |
CR revision of R5-224283 |
Google Inc., Verizon | 38.521-1 17.5.0 CR#17881 catF | HPUE_PC1_5_n77_n78-UEConTest | Rel-17 |
R5-96-e AI: 5.3.26.2.1 |
agreed | [WTS] [JSN] |
R5-225754 | UL MIMO MPR Tests for PC1.5 UEs |
CR revision of R5-224286 |
Google Inc. | 38.521-1 17.5.0 CR#17901 catF | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.27.2.1 |
agreed | [WTS] [JSN] |
R5-225755 | Adding applicability for new SUL and UL MIMO test cases |
CR revision of R5-225090 |
Huawei, Hisilicon | 38.522 17.5.0 CR#2101 catF | NR_bands_UL_MIMO_PC3_R17-UEConTest | Rel-17 |
R5-96-e AI: 5.3.27.3 |
agreed | [WTS] [JSN] |
R5-225756 | TxD A-MPR test requirements for NS_04 |
CR revision of R5-224285 |
Google Inc. | 38.521-1 17.5.0 CR#17891 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-225757 | Addition of 6.4G.1 Frequency error for Tx Diversity |
CR revision of R5-224786 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#18221 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-225758 | Addition of 6.4G.2.2 Carrier leakage for Tx Diversity |
CR revision of R5-224787 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#18231 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-225759 | Addition of 6.4G.2.3 In-band emissions for Tx Diversity |
CR revision of R5-224788 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#18241 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-225760 | Addition of 6.4G.2.4 EVM equalizer spectrum flatness for Tx Diversity |
CR revision of R5-224789 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#18251 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-225761 | Add new test case 6.5G.1 |
CR revision of R5-224969 |
China Telecom Corporation Ltd. | 38.521-1 17.5.0 CR#18621 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-225762 | Add new test case 6.5G.4 |
CR revision of R5-225014 |
China Telecom Corporation Ltd. | 38.521-1 17.5.0 CR#18671 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.1 |
agreed | [WTS] [JSN] |
R5-225763 | Updates to receiver requirements for TxD scenarios |
CR revision of R5-225036 |
Apple Portugal | 38.521-1 17.5.0 CR#18711 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.3.2 |
agreed | [WTS] [JSN] |
R5-225764 | Correction of Applicability of conformance test cases conditions, Tested Bands Selection Criteria and Branch for the TxD test cases in 38.521-1 |
CR revision of R5-224252 |
CAICT | 38.522 17.5.0 CR#1941 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.4 |
agreed | [WTS] [JSN] |
R5-225765 | Addition of test applicability for TxD test cases |
CR revision of R5-224791 |
Huawei, HiSilicon | 38.522 17.5.0 CR#2041 catF | NR_RF_TxD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.28.4 |
agreed | [WTS] [JSN] |
R5-225766 | Corrections on Mid test channel bandwidth for band n66 for Redcap |
CR revision of R5-224934 |
ZTE Corporation | 38.508-1 17.5.0 CR#25431 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.1 |
agreed | [WTS] [JSN] |
R5-225767 | Update PICS for RedCap UE |
CR revision of R5-225189 |
Huawei, HiSilicon | 38.508-2 17.5.0 CR#3801 catF | NR_redcap_plus_ARCH-UEConTest | Rel-17 |
R5-96-e AI: 5.3.31.2 |
agreed | [WTS] [JSN] |
R5-225768 | Update of PC2 UE requirements for band n1 and n3 into TC 7.3.2 |
CR revision of R5-224990 |
China Unicom | 38.521-1 17.5.0 CR#18641 catF | NR_PC2_UE_FDD-UEConTest | Rel-17 |
R5-96-e AI: 5.3.32.3.2 |
agreed | [WTS] [JSN] |
R5-225769 | Addition of test case 5.2A.2.5.1, 2RX PDSCH Demodulation Performance for HST-DPS CA |
CR revision of R5-225038 |
Ericsson | 38.521-4 16.12.0 CR#5711 catF | NR_HST_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.38.3.1 |
agreed | [WTS] [JSN] |
R5-225770 | Minimum test time for new HST enhancement RMCs |
CR revision of R5-224972 |
Ericsson | 38.521-4 16.12.0 CR#5671 catF | NR_HST_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.38.3.4 |
agreed | [WTS] [JSN] |
R5-225771 | HST FR2 6.2.3 UE maximum output power with additional requirements |
CR revision of R5-224983 |
Samsung | 38.521-2 16.12.0 CR#7881 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
agreed | [WTS] [JSN] |
R5-225772 | HST FR2 6.2D.1.1 adding Release-17 FR2 PC6 UE maximum output power for UL MIMO |
CR revision of R5-224984 |
Samsung | 38.521-2 16.12.0 CR#7891 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
agreed | [WTS] [JSN] |
R5-225773 | HST FR2 6.3.1 adding Release-17 FR2 PC6 Minimum output power |
CR revision of R5-224985 |
Samsung | 38.521-2 16.12.0 CR#7901 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
agreed | [WTS] [JSN] |
R5-225774 | HST FR2 6.4.2.2 adding Release-17 FR2 PC6 Carrier leakage |
CR revision of R5-224986 |
Samsung | 38.521-2 16.12.0 CR#7911 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
agreed | [WTS] [JSN] |
R5-225775 | HST FR2 6.4.2.3 adding Release-17 FR2 PC6 In-band emissions |
CR revision of R5-224987 |
Samsung | 38.521-2 16.12.0 CR#7921 catF | NR_HST_FR2-UEConTest | Rel-17 |
R5-96-e AI: 5.3.40.3.1 |
agreed | [WTS] [JSN] |
R5-225776 | Introduction of test frequencies for LTE Band 103 |
CR revision of R5-224141 |
Puloli | 36.508 17.2.0 CR#13921 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.41.1 |
agreed | [WTS] [JSN] |
R5-225777 | Introduction of LTE Band 103 in clause 5 |
CR revision of R5-224142 |
Puloli | 36.521-1 17.3.0 CR#54101 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.41.2 |
agreed | [WTS] [JSN] |
R5-225778 | Introduction of LTE Band 103 in spurious emission test cases in clause 6.6 |
CR revision of R5-224430 |
Puloli | 36.521-1 17.3.0 CR#54151 catF | LTE_upper_700MHz_A-UEConTest | Rel-17 |
R5-96-e AI: 5.3.41.2 |
agreed | [WTS] [JSN] |
R5-225779 | Update to MPR for CA TP analysis to add PC2 requirements |
CR revision of R5-224836 |
Huawei, HiSilicon | 38.905 17.5.0 CR#6421 catF | NR_RF_FR1_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.48.7 |
agreed | [WTS] [JSN] |
R5-225780 | Correction quantity config for inter-RAT to UTRA |
CR revision of R5-224461 |
ROHDE & SCHWARZ | 38.508-1 17.5.0 CR#24681 catF | TEI16_Test, SRVCC_NR_to_UMTS-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-225781 | Correction to connection diagram for DL CA Demodulation and CSI test cases |
CR revision of R5-224631 |
Anritsu | 38.508-1 17.5.0 CR#24771 catF | TEI16_Test, NR_perf_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-225782 | Correction to RRC message for uplink CA |
CR revision of R5-224641 |
Anritsu | 38.508-1 17.5.0 CR#24811 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-225783 | Corrections on 2 Rx antenna ports capabilities for band n29 |
CR revision of R5-224933 |
ZTE Corporation | 38.508-2 17.5.0 CR#3751 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-225784 | Correction of additional tolerance to test requirement of R15 Transmitter power test cases |
CR revision of R5-224240 |
CAICT | 38.521-1 17.5.0 CR#17751 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225785 | Editorial correction to TC 6.5.3.3 |
CR revision of R5-224257 |
Tejet | 38.521-1 17.5.0 CR#17821 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225786 | Corrections to A-MPR test requirements for NS_04 |
CR revision of R5-224281 |
Google Inc. | 38.521-1 17.5.0 CR#17871 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225787 | Test procedure and requirement correction in OBW test 6.5D.1 |
CR revision of R5-224294 |
Keysight Technologies UK Ltd, Huawei, HiSilicon | 38.521-1 17.5.0 CR#17961 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225788 | Update to 6.2D.3 to align NS_04 test configuration with 6.2.3 |
CR revision of R5-224829 |
Huawei, HiSilicon | 38.521-1 17.5.0 CR#18311 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225789 | Updating Additional emission test cases for NS_xxU |
CR revision of R5-225066 |
Huawei, Hisilicon | 38.521-1 17.5.0 CR#18761 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225790 | Correction of UL MIMO A-MPR test case |
CR revision of R5-225115 |
ROHDE & SCHWARZ | 38.521-1 17.5.0 CR#18991 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.1 |
agreed | [WTS] [JSN] |
R5-225791 | Addition of Operating bands in Table 5.2-1 |
CR revision of R5-224238 |
CAICT | 38.521-1 17.5.0 CR#17731 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.4.3 |
agreed | [WTS] [JSN] |
R5-225792 | Tx Fast Spherical Coverage test cases integration |
CR revision of R5-224121 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#7681 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225793 | FR2 Tx Signal Quality UL MIMO Test Case Updates |
CR revision of R5-224124 |
Qualcomm CDMA Technologies | 38.521-2 16.12.0 CR#7711 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225794 | Correction of spurious emissions test case |
CR revision of R5-225112 |
ROHDE & SCHWARZ | 38.521-2 16.12.0 CR#7951 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225795 | Updated Test points in FR2 CA MPR test case |
CR revision of R5-225234 |
Ericsson France S.A.S | 38.521-2 16.12.0 CR#8001 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225796 | Rx Fast Spherical Coverage test cases integration |
CR revision of R5-224122 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#7691 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.2 |
agreed | [WTS] [JSN] |
R5-225797 | Correction to interfere offset in 7.6.2 |
CR revision of R5-224630 |
Anritsu | 38.521-2 16.12.0 CR#7851 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.2 |
agreed | [WTS] [JSN] |
R5-225798 | Annex updates related to RSRP-B Rx Beam peak search |
CR revision of R5-224123 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#7701 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.3 |
agreed | [WTS] [JSN] |
R5-225799 | Correction of Power Class 2 test requirements in 6.2B.1.3.5 for Interband EN-DC FDD and TDD Duplex-mode |
CR revision of R5-224249 |
CAICT | 38.521-3 17.5.0 CR#14061 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225800 | Replacing the word LTE by E-UTRA in description of exception requirement |
CR revision of R5-224372 |
Sporton, Ericsson | 38.521-3 17.5.0 CR#14111 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225801 | Removal of brackets for DCI format for Tx test cases |
CR revision of R5-225047 |
Ericsson | 38.521-3 17.5.0 CR#14391 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225802 | Introduction of test section for UL MIMO EN-DC MPR with FR1 and FR2 |
CR revision of R5-225195 |
Ericsson | 38.521-3 17.5.0 CR#14451 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225803 | Introduction of test section for UL MIMO EN-DC A-MPR with FR1 and FR2 |
CR revision of R5-225196 |
Ericsson | 38.521-3 17.5.0 CR#14461 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225804 | Introduction of test tase for UL MIMO EN-DC MPR in FR2 |
CR revision of R5-225197 |
Ericsson | 38.521-3 17.5.0 CR#14471 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225805 | Introduction of test tase for UL MIMO EN-DC A-MPR in FR2 |
CR revision of R5-225198 |
Ericsson | 38.521-3 17.5.0 CR#14481 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225806 | P-MaxUE-FR1-r15 correction for PC2 ENDC test cases |
CR revision of R5-225224 |
Keysight technologies UK Ltd | 38.521-3 17.5.0 CR#14491 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225807 | Update for ref sensitivity for R15_combos |
CR revision of R5-224895 |
Qualcomm Austria RFFE GmbH | 38.521-3 17.5.0 CR#14201 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.2 |
agreed | [WTS] [JSN] |
R5-225808 | Correction of reference sensitivity test case |
CR revision of R5-225111 |
ROHDE & SCHWARZ | 38.521-3 17.5.0 CR#14411 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.2 |
agreed | [WTS] [JSN] |
R5-225809 | Core alignment and editorial corrections for FR1 CSI CA test cases |
CR revision of R5-224632 |
Anritsu | 38.521-4 16.12.0 CR#5581 catF | TEI16_Test, NR_perf_enh-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-225810 | Removal of brackets for DCI format in clause 5 |
CR revision of R5-225040 |
Ericsson | 38.521-4 16.12.0 CR#5721 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-225811 | Correction of NR-LTE coexistence test cases |
CR revision of R5-225117 |
ROHDE & SCHWARZ | 38.521-4 16.12.0 CR#5741 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-225812 | Clarification of UL RMC in FR1 aperiodic CQI reporting tests |
CR revision of R5-225119 |
ROHDE & SCHWARZ | 38.521-4 16.12.0 CR#5761 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.1 |
agreed | [WTS] [JSN] |
R5-225813 | Addition of missing RMC for PDCCH tests |
CR revision of R5-224656 |
Rohde & Schwarz | 38.521-4 16.12.0 CR#5641 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.7.4 |
agreed | [WTS] [JSN] |
R5-225814 | Correction of Applicability of conformance test cases conditions and Tested Bands Selection Criteria for the R15 test cases in 38.521-1 |
CR revision of R5-224250 |
CAICT | 38.522 17.5.0 CR#1921 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.8 |
agreed | [WTS] [JSN] |
R5-225815 | Correction on test applicability of HST TCs |
CR revision of R5-224225 |
CMCC | 38.533 17.3.1 CR#18631 catF | TEI16_Test, NR_HST-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
agreed | [WTS] [JSN] |
R5-225816 | Correction message contents 4.6.4.3 and 4.6.4.4 |
CR revision of R5-224466 |
ROHDE & SCHWARZ | 38.533 17.3.1 CR#18641 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
agreed | [WTS] [JSN] |
R5-225817 | Clarification on SFTD delay in 4.7.5.1 |
CR revision of R5-225216 |
Keysight Technologies UK Ltd | 38.533 17.3.1 CR#19471 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
agreed | [WTS] [JSN] |
R5-225818 | Correction of ENDC FR2 SS-RSRP measurement accuracy test case 5.7.1.1 |
CR revision of R5-225141 |
Ericsson | 38.533 17.3.1 CR#19311 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-225819 | Updates on 5.7.4.1 test procedure and test requirements |
CR revision of R5-225218 |
Keysight Technologies UK Ltd | 38.533 17.3.1 CR#19491 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-225820 | Updates on 5.7.4.2 test procedure and test requirements |
CR revision of R5-225228 |
Keysight Technologies UK Ltd | 38.533 17.3.1 CR#19511 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-225821 | Correction message contents 6.6.4.3 and 6.6.4.4 |
CR revision of R5-224473 |
ROHDE & SCHWARZ | 38.533 17.3.1 CR#18711 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
agreed | [WTS] [JSN] |
R5-225822 | Editorial correction to 5G RRM test case 7.6.1.x |
CR revision of R5-225002 |
Bureau Veritas, Keysight | 38.533 17.3.1 CR#19301 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
agreed | [WTS] [JSN] |
R5-225823 | Clarification on SFTD delay in 8.5.1.1 |
CR revision of R5-225217 |
Keysight Technologies UK Ltd | 38.533 17.3.1 CR#19481 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.6 |
agreed | [WTS] [JSN] |
R5-225824 | Corrections to Interruptions at SCell addition/release RRM tests |
CR revision of R5-225219 |
Apple Portugal | 38.533 17.3.1 CR#19501 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.6 |
agreed | [WTS] [JSN] |
R5-225825 | Ref sensitivity TP selection for DC_2A_n41A |
CR revision of R5-224884 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#6481 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-225826 | Ref sensitivity TP selection for DC_1A_n77A |
CR revision of R5-224889 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#6511 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-225827 | Ref sensitivity TP selection for DC_3A_n77A |
CR revision of R5-224890 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#6521 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-225828 | Ref sensitivity TP selection for DC_8A_n78A |
CR revision of R5-224891 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#6531 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-225829 | Ref sensitivity TP selection for DC_5A_n78A |
CR revision of R5-224892 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#6541 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-225830 | Ref sensitivity TP selection for DC_8A_n79A |
CR revision of R5-224893 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#6551 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-225831 | Ref sensitivity TP selection for DC_21A_n79A |
CR revision of R5-224894 |
Qualcomm Austria RFFE GmbH | 38.905 17.5.0 CR#6561 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-225832 | Updated TP analysis MPR for CA in FR2 |
CR revision of R5-225232 |
Ericsson | 38.905 17.5.0 CR#6741 catF | TEI15_Test | Rel-17 |
R5-96-e AI: 5.4.16 |
agreed | [WTS] [JSN] |
R5-225833 | New connection diagram for RF, 1x4 in static propagation conditions |
CR revision of R5-225008 |
Ericsson | 36.508 17.2.0 CR#13961 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.1 |
agreed | [WTS] [JSN] |
R5-225834 | Correction of 6.6.2.2 Additional Spectrum Emission Mask Test configuration Table |
CR revision of R5-224035 |
MediaTek Inc. | 36.521-1 17.3.0 CR#54091 catF | TEI8_Test | Rel-17 |
R5-96-e AI: 5.5.1.3.1 |
agreed | [WTS] [JSN] |
R5-225835 | Making test case 9.8.1.1 applicable to any UE supporting ce-ModeA |
CR revision of R5-225021 |
Ericsson | 36.521-1 17.3.0 CR#54181 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-17 |
R5-96-e AI: 5.5.1.3.3 |
agreed | [WTS] [JSN] |
R5-225836 | Test case 9.8.1.1 to be applicable for any UE supporting ce-ModeA |
CR revision of R5-225019 |
Ericsson | 36.521-2 16.13.0 CR#9911 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-16 |
R5-96-e AI: 5.5.1.4 |
agreed | [WTS] [JSN] |
R5-225837 | Correction of Default Configuration Parameters for Test 1 in Test Case 7.1.11 |
CR revision of R5-224487 |
STMicroelectronics | 36.521-3 16.13.0 CR#26471 catF | TEI13_Test | Rel-16 |
R5-96-e AI: 5.5.1.5 |
agreed | [WTS] [JSN] |
R5-225838 | Corrections to the GNSS scenarios |
CR revision of R5-224477 |
ROHDE & SCHWARZ | 37.571-5 16.8.0 CR#2171 catF | TEI9_Test | Rel-16 |
R5-96-e AI: 5.6.11 |
agreed | [WTS] [JSN] |
R5-225839 | Updates to Radiated Static Channel Tests A.6.1.1 and A.8.1.1 |
CR revision of R5-224491 |
Qualcomm Technologies Int | 37.901-5 16.8.0 CR#301 catF | TEI15_Test, FS_UE_5GNR_App_Data_Perf | Rel-16 |
R5-96-e AI: 5.6.17 |
agreed | [WTS] [JSN] |
R5-225840 | Introduction of new UE ICS for UPLF test mode |
CR revision of R5-225193 |
Ericsson | 38.508-2 17.5.0 CR#3811 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-225841 | Rel-16 Addition of new test function to limit Pcell power: Option 2 |
CR revision of R5-224088 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 16.4.0 CR#671 catB | TEI16_Test | Rel-16 |
R5-96-e AI: 5.4.3 |
agreed | [WTS] [JSN] |
R5-225842 | Rel-17 Addition of new test function to limit Pcell power: Option 2 |
CR revision of R5-224089 |
Keysight technologies UK Ltd, Apple Portugal | 38.509 17.0.0 CR#681 catA | TEI16_Test | Rel-17 |
R5-96-e AI: 5.4.3 |
agreed | [WTS] [JSN] |
R5-225843 | Update to FR2 CA MPR test case 6.2A.2.1 to prevent SCell drop by using UE PHR |
CR revision of R5-225192 |
Ericsson | 38.521-2 16.12.0 CR#7961 catF | TEI15_Test | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225844 | Extension of test function approach to limit Pcell Power in some FR2 UL CA tests |
CR revision of R5-225227 |
Keysight technologies UK Ltd | 38.521-2 16.12.0 CR#7991 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225845 | Correction to test procedure of minimum output power |
CR revision of R5-224621 |
Anritsu | 38.521-2 16.12.0 CR#7841 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.5.1 |
agreed | [WTS] [JSN] |
R5-225846 | Completion 7.7.6.1 including TT anaysis results |
CR revision of R5-224188 |
Sporton | 38.533 17.3.1 CR#18601 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225847 | Addition of new test case 5.7.6.1 EN-DC FR2 L1-SINR measurement |
CR revision of R5-224769 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19221 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225848 | Addition of new test case 5.7.6.2 EN-DC FR2 L1-SINR measurement |
CR revision of R5-224771 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19231 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225849 | Addition of new test case 5.7.6.3 EN-DC FR2 L1-SINR measurement |
CR revision of R5-224773 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19241 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225850 | Correction of ENDC FR2-FR2 SS-RSRP measurement accuracy test case 5.7.1.2 including Test Tolerance |
CR revision of R5-225142 |
Ericsson | 38.533 17.3.1 CR#19321 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-225851 | Correction to NR SL RRM TC 9.1.3.2 - Cell highest priority with TT |
CR revision of R5-224513 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18861 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-225852 | Correction to NR SL RRM TC 9.1.4.3 - resource re-evaluation with TT |
CR revision of R5-224516 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18891 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-225853 | Correction to Annex F for NR SL RRM TCs |
CR revision of R5-224520 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18931 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-17 |
R5-96-e AI: 5.3.7.8 |
agreed | [WTS] [JSN] |
R5-225854 | TT analysis for NR SL RRM TC 9.1.4.3 - resource re-evaluation |
CR revision of R5-224530 |
Huawei, HiSilicon | 38.903 16.12.0 CR#3501 catF | 5G_V2X_NRSL_eV2XARC-UEConTest | Rel-16 |
R5-96-e AI: 5.3.7. |
agreed | [WTS] [JSN] |
R5-225855 | Correction to NR PS RRM TC 7.1.1.3 - intra-freq reselection low mobility with TT |
CR revision of R5-224533 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18941 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
agreed | [WTS] [JSN] |
R5-225856 | Correction to NR PS RRM TC 7.1.1.4 - intra-freq reselection not-at-cell-edge with TT |
CR revision of R5-224534 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18951 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
agreed | [WTS] [JSN] |
R5-225857 | Correction to NR PS RRM TC 7.1.1.5 - inter-freq reselection low mobility with TT |
CR revision of R5-224535 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18961 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
agreed | [WTS] [JSN] |
R5-225858 | Correction to NR PS RRM TC 7.1.1.6 - inter-freq reselection not-at-cell-edge with TT |
CR revision of R5-224536 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18971 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
agreed | [WTS] [JSN] |
R5-225859 | Correction to Annex F for NR PS RRM TCs |
CR revision of R5-224537 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18981 catF | NR_UE_pow_sav-UEConTest | Rel-17 |
R5-96-e AI: 5.3.9.5 |
agreed | [WTS] [JSN] |
R5-225860 | TT analysis for NR PS RRM TC 7.1.1.3 - intra-freq reselection low mobility |
CR revision of R5-224538 |
Huawei, HiSilicon | 38.903 16.12.0 CR#3531 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.6 |
agreed | [WTS] [JSN] |
R5-225861 | TT analysis for NR PS RRM TC 7.1.1.4 - intra-freq reselection not-at-cell-edge |
CR revision of R5-224539 |
Huawei, HiSilicon | 38.903 16.12.0 CR#3541 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.6 |
agreed | [WTS] [JSN] |
R5-225862 | TT analysis for NR PS RRM TC 7.1.1.5 - inter-freq reselection low mobility |
CR revision of R5-224540 |
Huawei, HiSilicon | 38.903 16.12.0 CR#3551 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.6 |
agreed | [WTS] [JSN] |
R5-225863 | TT analysis for NR PS RRM TC 7.1.1.6 - inter-freq reselection not-at-cell-edge |
CR revision of R5-224541 |
Huawei, HiSilicon | 38.903 16.12.0 CR#3561 catF | NR_UE_pow_sav-UEConTest | Rel-16 |
R5-96-e AI: 5.3.9.6 |
agreed | [WTS] [JSN] |
R5-225864 | Correction to NR SA FR2 RRM TC 7.1.1.1 - intra-freq reselection with TT |
CR revision of R5-224551 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19081 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
agreed | [WTS] [JSN] |
R5-225865 | Correction to NR SA FR2 RRM TC 7.1.1.2 - inter-freq reselection with TT |
CR revision of R5-224552 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19091 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.5 |
agreed | [WTS] [JSN] |
R5-225866 | Correction to Annex F for NR RRM TCs |
CR revision of R5-224609 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19111 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.7 |
agreed | [WTS] [JSN] |
R5-225867 | TT analysis for NR SA FR2 RRM TC 7.1.1.1 - intra-freq reselection |
CR revision of R5-224554 |
Huawei, HiSilicon | 38.903 16.12.0 CR#3571 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225868 | TT analysis for NR SA FR2 RRM TC 7.1.1.2 - inter-freq reselection |
CR revision of R5-224555 |
Huawei, HiSilicon | 38.903 16.12.0 CR#3581 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-16 |
R5-96-e AI: 5.4.15 |
agreed | [WTS] [JSN] |
R5-225869 | Correction to EVM measurement point for DFTs-OFDM DM-RS Type 2 |
CR revision of R5-224618 |
Anritsu | 38.521-1 17.5.0 CR#18091 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.3.3 |
agreed | [WTS] [JSN] |
R5-225870 | Correction to EVM measurement point for DFTs-OFDM DM-RS Type 2 |
CR revision of R5-224619 |
Anritsu | 38.521-2 16.12.0 CR#7821 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.4.3 |
agreed | [WTS] [JSN] |
R5-225871 | Correction to test parameters in 5.6.3.x |
CR revision of R5-224649 |
Anritsu | 38.533 17.3.1 CR#19191 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.3 |
agreed | [WTS] [JSN] |
R5-225872 | Update of eMIMO test case 6.5.5.5 and 6.5.5.6 |
CR revision of R5-224776 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19251 catF | NR_eMIMO-UEConTest | Rel-17 |
R5-96-e AI: 5.3.8.8 |
agreed | [WTS] [JSN] |
R5-225873 | Addition of TT analysis for eMIMO L1-SINR test case 5.7.6.1 and 7.7.6.1 |
CR revision of R5-224770 |
Huawei, HiSilicon, Sporton | 38.903 16.12.0 CR#3611 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225874 | Addition of TT analysis for eMIMO L1-SINR test case 5.7.6.2 |
CR revision of R5-224772 |
Huawei, HiSilicon | 38.903 16.12.0 CR#3621 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225875 | Addition of TT analysis for eMIMO L1-SINR test case 5.7.6.3 |
CR revision of R5-224774 |
Huawei, HiSilicon | 38.903 16.12.0 CR#3631 catF | NR_eMIMO-UEConTest | Rel-16 |
R5-96-e AI: 5.3.8.9 |
agreed | [WTS] [JSN] |
R5-225876 | Correction to Mob_enh RRM TCs 6.3.1.X - FR1 DAPS HO |
CR revision of R5-224500 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18761 catF | NR_Mob_enh-UEConTest | Rel-17 |
R5-96-e AI: 5.3.6.4 |
agreed | [WTS] [JSN] |
R5-225877 | Complete TC 14.2.1 including TT analysis results |
CR revision of R5-223970 |
ROHDE & SCHWARZ | 37.571-1 16.13.0 CR#3771 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-225878 | Complete TC 14.3.1 including TT analysis results |
CR revision of R5-223971 |
ROHDE & SCHWARZ | 37.571-1 16.13.0 CR#3781 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-225879 | TT analysis for TS 37.571-1 TC 14.2.1 |
CR revision of R5-223969 |
ROHDE & SCHWARZ | 38.903 16.12.0 CR#3231 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.6 |
agreed | [WTS] [JSN] |
R5-225880 | TT analysis for TS 37.571-1 TC 14.3.1 |
CR revision of R5-223976 |
ROHDE & SCHWARZ | 38.903 16.12.0 CR#3251 catF | NR_pos-UEConTest | Rel-16 |
R5-96-e AI: 5.3.14.6 |
agreed | [WTS] [JSN] |
R5-225881 | Addition of new test case additional spurious for FR2 |
CR revision of R5-225105 |
ROHDE & SCHWARZ | 38.521-3 17.5.0 CR#14401 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.6.1 |
agreed | [WTS] [JSN] |
R5-225882 | Addition of test case for additional spurious for FR2 |
CR revision of R5-225106 |
ROHDE & SCHWARZ | 38.522 17.5.0 CR#2111 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.8 |
agreed | [WTS] [JSN] |
R5-225883 | Update of EN-DC FR1 TC 4.5.7.1 |
CR revision of R5-223984 |
MediaTek Inc. | 38.533 17.3.1 CR#18491 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
withdrawn | [WTS] [JSN] |
R5-225884 | Correction to EN-DC FR1 RRM TC 4.5.2.X - interruption |
CR revision of R5-224542 |
Huawei, HiSilicon | 38.533 17.3.1 CR#18991 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
agreed | [WTS] [JSN] |
R5-225885 | Correction to EN-DC FR1 RRM TC 4.5.3.X - SCell activation |
CR revision of R5-224543 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19001 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
agreed | [WTS] [JSN] |
R5-225886 | Correction to EN-DC FR1 RRM TC 4.5.6.1.2 - BWP switching |
CR revision of R5-224544 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19011 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.1 |
agreed | [WTS] [JSN] |
R5-225887 | Correction to NR SA FR1 RRM TC 6.5.2.1 - interruption |
CR revision of R5-224547 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19041 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
agreed | [WTS] [JSN] |
R5-225888 | Correction to NR SA FR1 RRM TC 6.5.3.X - SCell activation |
CR revision of R5-224548 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19051 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
agreed | [WTS] [JSN] |
R5-225889 | Correction to NR SA FR1 RRM TC 6.5.6.1.1 - BWP switching |
CR revision of R5-224549 |
Huawei, HiSilicon | 38.533 17.3.1 CR#19061 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-96-e AI: 5.4.9.4 |
agreed | [WTS] [JSN] |
1844 documents (1.159775018692 seconds)