Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-210000 Agenda - opening session agenda

revised to R5-211282

WG Chairman R5-90-e

AI: 1

revised [WTS] [JSN]
R5-210001 RAN5#90-e E-Meeting Timelines, Scope, Process agenda WG Chairman R5-90-e

AI: 1

noted [WTS] [JSN]
R5-210002 RAN5 Leadership Team other WG Chairman R5-90-e

AI: 2.1

noted [WTS] [JSN]
R5-210003 RAN5#89-e WG Minutes report ETSI Secretariat R5-90-e

AI: 2.1

approved [WTS] [JSN]
R5-210004 RAN5#89-e WG Action Points report ETSI Secretariat R5-90-e

AI: 2.1

noted [WTS] [JSN]
R5-210005 Latest RAN Plenary notes report WG Chairman R5-90-e

AI: 2.1

noted [WTS] [JSN]
R5-210006 Latest RAN Plenary draft Report report WG Chairman R5-90-e

AI: 2.1

noted [WTS] [JSN]
R5-210007 Post Plenary Active Work Item update other ETSI Secretariat R5-90-e

AI: 2.1

noted [WTS] [JSN]
R5-210008 RAN5 SR to RP#90-e report WG Chairman R5-90-e

AI: 2.2

noted [WTS] [JSN]
R5-210009 TF160 SR to RP#90-e report WG Chairman R5-90-e

AI: 2.2

noted [WTS] [JSN]
R5-210010 RAN5#90-e LS Template other WG Chairman R5-90-e

AI: 4.3

noted [WTS] [JSN]
R5-210011 Meeting schedule for 2021-22 other WG Chairman R5-90-e

AI: 4.5.3

noted [WTS] [JSN]
R5-210012 WI Progress and Target Completion Date Review other WG Chairman R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210013 Review deadlines for next quarter other WG Chairman R5-90-e

AI: 7.6

noted [WTS] [JSN]
R5-210014 LS on nominal channel spacing calculation for two carriers at band n41 with 40MHz and 80MHz channel bandwidths LS in

source LS: R4-2016779

TSG WG RAN4 NR_newRAT-Core Rel-15 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-210015 LS on OTA LTE UE TRP and TRS Requirements LS in

source LS: TFES(20)067025r5

MSG TFES R5-90-e

AI: 3

noted [WTS] [JSN]
R5-210016 Test methods for over-the-air TRP field measurements of unwanted emissions from IMT radio equipment utilizing active antennas LS in

source LS: ITU-R WP 1C LS 2 3GPP cc 1A,5A,5D-R19-WP1C-201124-TD-0014!!MSW-E (edited)

ITU-R WP 1C Rel-16 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-210017 LS on Use of Inclusive Language in 3GPP LS in

source LS: SP-201143

TSG SA Rel-17 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-210018 NGMN-GTI 5G Smart Devices Supporting Network Slicing LS in NGMN Next Generation Mobile Networks Alliance Project 5G Smart Devices Supporting Network Slicing R5-90-e

AI: 3

noted [WTS] [JSN]
R5-210019 LS to 3GPP RAN5 on LTE frequency band grouping LS in

source LS: CAG-21-003

GCF CAG R5-90-e

AI: 3

noted [WTS] [JSN]
R5-210020 LS on SCell dropping LS in

source LS: R4-2103410

TSG WG RAN4 NR_newRAT-Core Rel-15 R5-90-e

AI: 5.2

noted [WTS] [JSN]
R5-210021 Draft RAN5 Terms of Reference other

revised to R5-211314

WG Chairman R5-90-e

AI: 4.3

revised [WTS] [JSN]
R5-210022 Correction to NR MAC test case 7.1.1.4.2.5 CR Keysight Technologies UK Ltd 38.523-1 16.6.0 CR#1913 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-210023 Clean up editors note CR Anritsu 38.521-1 16.6.0 CR#1105 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-210024 Correction to test cases 22.3.1.6a, 22.3.1.9 and 22.3.2.7 CR

revised to R5-211368

ROHDE & SCHWARZ, Nordic Semiconductor, Verizon, Telstra 36.523-2 16.7.0 CR#1331 catF TEI13_Test, NB_IOTenh-UEConTest Rel-16 R5-90-e

AI: 6.5.4

revised [WTS] [JSN]
R5-210025 Update release applicability of RRC TC 8.1.1.2.4 CR

revised to R5-211412

NTT DOCOMO INC. 38.523-2 16.6.0 CR#109 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

revised [WTS] [JSN]
R5-210026 Addition of new 5GS NAS test case to test handling of extended octets CR

revised to R5-211402

NTT DOCOMO INC. 38.523-1 16.6.0 CR#1914 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.3

revised [WTS] [JSN]
R5-210027 Update of test case 8.2.1.1.1 to support Inter-RAT handover from NR to EN-DC CR

revised to R5-211501

China Telecommunications 38.523-1 16.6.0 CR#1915 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.4.4.2.1

revised [WTS] [JSN]
R5-210028 Update test case 8.1.5.1.1 to add UE capability nr-HO-ToEN-DC-r16 CR

revised to R5-211500

China Telecommunications 38.523-1 16.6.0 CR#1916 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.4.4.1.5

revised [WTS] [JSN]
R5-210029 Addition of new MDT test case 8.1.6.1.2.1 CR

revised to R5-211470

ZTE, SRTC, Tejet 38.523-1 16.6.0 CR#1917 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210030 Addition of new MDT test case 8.1.6.1.2.2 CR

revised to R5-211471

ZTE, SRTC, Tejet 38.523-1 16.6.0 CR#1918 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210031 Addition of new MDT test case 8.1.6.1.2.3 CR

revised to R5-211472

ZTE, SRTC, Tejet 38.523-1 16.6.0 CR#1919 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210032 Addition of new MDT test case 8.1.6.1.2.4 CR ZTE, SRTC, Tejet 38.523-1 16.6.0 CR#1920 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-210033 Addition of new MDT test case 8.1.6.1.2.5 CR ZTE, SRTC, Tejet 38.523-1 16.6.0 CR#1921 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-210034 Addition of new MDT test case 8.1.6.1.2.6 CR ZTE Corporation 38.523-1 16.6.0 CR#1922 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-210035 Addition of new MDT test case 8.1.6.1.2.7 CR

revised to R5-211473

ZTE Corporation 38.523-1 16.6.0 CR#1923 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210036 Addition of new MDT test case 8.1.6.1.2.8 CR

revised to R5-211474

ZTE Corporation 38.523-1 16.6.0 CR#1924 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210037 Addition of new MDT test case 8.1.6.1.2.9 CR ZTE Corporation 38.523-1 16.6.0 CR#1925 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-210038 Addition of new MDT test case 8.1.6.1.2.10 CR ZTE Corporation 38.523-1 16.6.0 CR#1926 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-210039 Addition of new MDT test case 8.1.6.1.2.11 CR ZTE Corporation 38.523-1 16.6.0 CR#1927 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-210040 Addition of new MDT test case 8.1.6.1.2.12 CR

revised to R5-211475

ZTE Corporation 38.523-1 16.6.0 CR#1928 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210041 Addition of new MDT test case 8.1.6.1.2.13 CR

revised to R5-211476

ZTE Corporation 38.523-1 16.6.0 CR#1929 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210042 Editorial TC BT measurement collection in Immediate MDT to the correct subclause CR CMCC 36.523-1 16.7.0 CR#4987 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

agreed [WTS] [JSN]
R5-210043 Editorial TC BT measurement collection in Logged MDT to the correct subclause CR CMCC 36.523-1 16.7.0 CR#4988 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

agreed [WTS] [JSN]
R5-210044 Editorial TC BT measurement collection in RLF logging to the correct subclause CR CMCC 36.523-1 16.7.0 CR#4989 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

agreed [WTS] [JSN]
R5-210045 Editorial TC WLAN measurement collection in RLF logging to the correct subclause CR CMCC 36.523-1 16.7.0 CR#4990 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

agreed [WTS] [JSN]
R5-210046 Editorial TC BT measurement collection in CEF logging to the correct subclause CR CMCC 36.523-1 16.7.0 CR#4991 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

agreed [WTS] [JSN]
R5-210047 Editorial TC WLAN measurement collection in CEF logging to the correct subclause CR CMCC 36.523-1 16.7.0 CR#4992 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

agreed [WTS] [JSN]
R5-210048 Update of TC WLAN measurement collection in Immediate MDT for specific sys infos CR

revised to R5-211509

CMCC 36.523-1 16.7.0 CR#4993 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

revised [WTS] [JSN]
R5-210049 Update of TC WLAN measurement collection in Logged MDT for specific sys infos CR

revised to R5-211510

CMCC 36.523-1 16.7.0 CR#4994 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

revised [WTS] [JSN]
R5-210050 Update of LTE_MDT_BT_WLAN test cases for PICS definition CR CMCC 36.523-2 16.7.0 CR#1332 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.4

agreed [WTS] [JSN]
R5-210051 Corrections for support of multiple GPS signals CR

revised to R5-211516

Spirent Communications 37.571-5 16.3.0 CR#203 catF TEI12_Test Rel-16 R5-90-e

AI: 6.6.7.4

revised [WTS] [JSN]
R5-210052 Corrections for support of multiple signals in a GNSS CR

revised to R5-211848

Spirent Communications 37.571-5 16.3.0 CR#204 catF TEI12_Test Rel-16 R5-90-e

AI: 5.6.11

revised [WTS] [JSN]
R5-210053 Addition of support for BDS B1C signal CR

revised to R5-211340

Spirent Communications, CATT, CAICT 37.571-5 16.3.0 CR#205 catF B1C_BDS_pos_UEConTest Rel-16 R5-90-e

AI: 6.3.23.4

revised [WTS] [JSN]
R5-210054 Addition of support for BDS B1C signal CR

revised to R5-211812

Spirent Communications, CATT, CAICT 37.571-5 16.3.0 CR#206 catF B1C_BDS_pos_UEConTest Rel-16 R5-90-e

AI: 5.3.21.3

revised [WTS] [JSN]
R5-210055 Corrections to generic test procedures for IMS CR

revised to R5-211369

ROHDE & SCHWARZ, Ericsson, MCC TF160 38.508-1 16.6.0 CR#1673 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

revised [WTS] [JSN]
R5-210056 Corrections to A.5 on MT Voice Call CR ROHDE & SCHWARZ, MCC TF160 34.229-5 15.2.1 CR#70 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-210057 Corrections to test case 6.3 CR ROHDE & SCHWARZ, Anritsu, Keysight, Qualcomm 34.229-5 15.2.1 CR#71 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-210058 Update Generic Test Procedure for IMS MO speech call CR Ericsson 38.508-1 16.6.0 CR#1674 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

withdrawn [WTS] [JSN]
R5-210059 Voiding A.1.9 CR ROHDE & SCHWARZ 34.229-1 15.6.0 CR#1452 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.7

agreed [WTS] [JSN]
R5-210060 Voiding generic procedures for text call CR ROHDE & SCHWARZ 34.229-1 15.6.0 CR#1453 catF TEI8_Test Rel-15 R5-90-e

AI: 6.6.6.1

agreed [WTS] [JSN]
R5-210061 Voiding SigComp test cases CR ROHDE & SCHWARZ 34.229-1 15.6.0 CR#1454 catF TEI8_Test Rel-15 R5-90-e

AI: 6.6.6.1

agreed [WTS] [JSN]
R5-210062 Correction to NR Idle mode test case 6.4.1.1 CR Keysight Technologies UK 38.523-1 16.6.0 CR#1930 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-210063 Correction to NR MAC test case 7.1.1.8.1 CR

revised to R5-211382

Keysight Technologies UK 38.523-1 16.6.0 CR#1931 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

revised [WTS] [JSN]
R5-210064 Correction to NR MAC test case 7.1.1.9.1 CR Keysight Technologies UK, Qualcomm 38.523-1 16.6.0 CR#1932 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

withdrawn [WTS] [JSN]
R5-210065 Correction to NR MAC test case 7.1.1.4.2.5 CR Keysight Technologies UK 38.523-1 16.6.0 CR#1933 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

withdrawn [WTS] [JSN]
R5-210066 Correction to NR5GC IRAT test case 8.1.4.2.1.1 CR Keysight Technologies UK 38.523-1 16.6.0 CR#1934 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.4

agreed [WTS] [JSN]
R5-210067 Correction of NR RRC test case 8.1.4.1.5 CR

revised to R5-211332

Keysight Technologies UK 38.523-1 16.6.0 CR#1935 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.4

revised [WTS] [JSN]
R5-210068 Correction to NR CA testcases 8.2.4.1.1.x CR Keysight Technologies UK 38.523-1 16.6.0 CR#1936 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.4

withdrawn [WTS] [JSN]
R5-210069 Correction to Table 4.5.2.2-4: NR RRC_IDLE Extension CR Keysight Technologies UK 38.508-1 16.6.0 CR#1675 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

withdrawn [WTS] [JSN]
R5-210070 Correction to generic procedure for UE-requested PDU session modification after S1 to N1 change CR

revised to R5-211370

Keysight Technologies UK 38.508-1 16.6.0 CR#1676 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

revised [WTS] [JSN]
R5-210071 Correction to emergency bearer service over S1 for eCall test cases CR

revised to R5-211505

Keysight Technologies UK, Qualcomm 36.508 16.7.0 CR#1340 catF TEI14_Test, EIEI-UEConTest Rel-16 R5-90-e

AI: 6.5.1

revised [WTS] [JSN]
R5-210072 Addition of IMS over 5GS test case 7.25 CR

revised to R5-211334

ROHDE & SCHWARZ 34.229-5 15.2.1 CR#72 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210073 Addition of new test case 9.6.1.1_A.6 CR

revised to R5-211749

DEKRA 36.521-1 16.7.0 CR#5242 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

revised [WTS] [JSN]
R5-210074 Addition of new test case 9.6.1.2_A.6 CR

revised to R5-211750

DEKRA 36.521-1 16.7.0 CR#5243 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

revised [WTS] [JSN]
R5-210075 Addition of new test case 9.1.72 CR

revised to R5-211753

DEKRA 36.521-3 16.7.0 CR#2555 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.4

revised [WTS] [JSN]
R5-210076 Addition of new test case 9.2.59 CR

revised to R5-211754

DEKRA 36.521-3 16.7.0 CR#2556 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.4

revised [WTS] [JSN]
R5-210077 Update of EN-DC inter-band configurations in clause 4.3.1 CR

revised to R5-211660

China Telecommunications 38.508-1 16.6.0 CR#1677 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

revised [WTS] [JSN]
R5-210078 Update of UE capabilities for EN-DC configurations CR

revised to R5-211858

China Telecommunications 38.508-2 16.6.0 CR#140 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

revised [WTS] [JSN]
R5-210079 Addition of applicabilities for new IMS over 5GS test cases CR

revised to R5-211419

ROHDE & SCHWARZ 34.229-2 15.5.0 CR#278 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.8

revised [WTS] [JSN]
R5-210080 New WID on UE Conformance Test Aspects for NR RF Requirement Enhancements for FR2 WID new

revised to R5-211302

Nokia, Nokia Shanghai Bell Rel-16 R5-90-e

AI: 4.1

revised [WTS] [JSN]
R5-210081 Introduction of Additional capabilities for NR Band n53 CR Nokia, Nokia Shanghai Bell 38.508-2 16.6.0 CR#141 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-210082 Introduction of FR2 DL 256QAM CR

revised to R5-211919

Nokia, Nokia Shanghai Bell 38.521-2 16.6.0 CR#451 catF NR_DL256QAM_FR2-UEConTest Rel-16 R5-90-e

AI: 5.3.26.3.2

revised [WTS] [JSN]
R5-210083 Conclusion of some Rel-16 inter-band EN-DC configurations discussion Nokia, Nokia Shanghai Bell NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.11

noted [WTS] [JSN]
R5-210084 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_7A_n3A CR

revised to R5-211774

Nokia, Nokia Shanghai Bell, Ericsson 38.905 16.6.0 CR#337 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-210085 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_8A_n3A CR

revised to R5-211775

Nokia, Nokia Shanghai Bell, Ericsson 38.905 16.6.0 CR#338 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-210086 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_20A_n1A CR

revised to R5-211776

Nokia, Nokia Shanghai Bell, Ericsson 38.905 16.6.0 CR#339 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-210087 Introduction of Rel-16 EN-DC configuration DC_7A_n3A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211766

Nokia, Nokia Shanghai Bell, Ericsson 38.521-3 16.6.0 CR#837 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

revised [WTS] [JSN]
R5-210088 Introduction of Rel-16 EN-DC configuration DC_8A_n3A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211767

Nokia, Nokia Shanghai Bell, Ericsson 38.521-3 16.6.0 CR#838 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

revised [WTS] [JSN]
R5-210089 Introduction of Rel-16 EN-DC configuration DC_20A_n1A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211768

Nokia, Nokia Shanghai Bell, Ericsson 38.521-3 16.6.0 CR#839 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

revised [WTS] [JSN]
R5-210090 Updated TP analysis for 7.3B Reference sensitivity for EN-DC in FR1 CR

revised to R5-211733

Nokia, Nokia Shanghai Bell 38.905 16.6.0 CR#340 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-210091 Introduction of DC_7A_n3A to reference sensitivity test CR

revised to R5-211771

Nokia, Nokia Shanghai Bell 38.521-3 16.6.0 CR#840 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

revised [WTS] [JSN]
R5-210092 Introduction of DC_8A_n1A and DC_8A_n3A to reference sensitivity test CR

revised to R5-211772

Nokia, Nokia Shanghai Bell 38.521-3 16.6.0 CR#841 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

revised [WTS] [JSN]
R5-210093 Introduction of DC_7A-20A_n3A to reference sensitivity test CR Nokia, Nokia Shanghai Bell 38.521-3 16.6.0 CR#842 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

agreed [WTS] [JSN]
R5-210094 Corrections and extensions to applicability statements of IMS over 5GS test cases CR

revised to R5-211420

ROHDE & SCHWARZ 34.229-2 15.5.0 CR#279 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.8

revised [WTS] [JSN]
R5-210095 Corrections to test case 6.4 CR ROHDE & SCHWARZ 34.229-5 15.2.1 CR#73 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-210096 SR - Rel-16 IIOT after RAN5#90-e WI status report CMCC NR_IioT-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210097 WP - Rel-16 IIOT after RAN5#90-e Work Plan CMCC NR_IioT-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210098 SR - NR_Rel-16_CA_DC after RAN5#90-e WI status report CMCC NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210099 WP - NR_Rel-16_CA_DC after RAN5#90-e Work Plan CMCC NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210100 Checklist - NR_Rel-16_CA_DC for RAN5#89-e discussion CMCC, BV NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 4.2.1

noted [WTS] [JSN]
R5-210101 SR - Rel-16 HST after RAN5#90-e WI status report CMCC NR_HST-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210102 WP - Rel-16 HST after RAN5#90-e Work Plan CMCC NR_HST-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210103 Revised WID on UE Conformance Test Aspects for NR HST WID revised

revised to R5-211363

CMCC NR_HST-UEConTest Rel-16 R5-90-e

AI: 7.4.2

revised [WTS] [JSN]
R5-210104 New WID on UE Conformance Test Aspects for Enhancement of Network Slicing WID new

revised to R5-211303

China Mobile, China Telecom, China Unicom Rel-16 R5-90-e

AI: 4.1

revised [WTS] [JSN]
R5-210105 New SID: Study on on 5G NR UE supporting Network Slicing Testing SID new

revised to R5-211309

China Mobile, China Unicom Rel-16 R5-90-e

AI: 4.5.3

revised [WTS] [JSN]
R5-210106 Proposal for introduction of a New Study Item on 5G NR UE supporting Network Slicing Testing discussion

revised to R5-211317

CMCC Rel-16 R5-90-e

AI: 4.5.3

revised [WTS] [JSN]
R5-210107 5G Smart Devices Supporting Network Slicing discussion CMCC Rel-16 R5-90-e

AI: 4.2.1

noted [WTS] [JSN]
R5-210108 Addition of Abbreviations and References for R16 NR HST in 3.3 and References CR

revised to R5-211820

CMCC 38.521-4 16.6.0 CR#264 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

revised [WTS] [JSN]
R5-210109 Addition of Applicability of different requirements for R16 NR HST in 5.1.1.7 CR

revised to R5-211817

CMCC 38.521-4 16.6.0 CR#265 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.1

revised [WTS] [JSN]
R5-210110 Addition of HST-DPS Channel Profile in B.3.3 CR

revised to R5-211821

CMCC 38.521-4 16.6.0 CR#266 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

revised [WTS] [JSN]
R5-210111 Addition of HST-SFN Channel Profile in B.3.2 CR

revised to R5-211822

CMCC 38.521-4 16.6.0 CR#267 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

revised [WTS] [JSN]
R5-210112 Update of Applicability of requirements for mandatory UE features with capability signalling for R16 NR HST in 5.1.1.4 CR

revised to R5-211818

CMCC 38.521-4 16.6.0 CR#268 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.1

revised [WTS] [JSN]
R5-210113 Update of Applicability of requirements for optional UE features for R16 NR HST in 5.1.1.3 CR

revised to R5-211819

CMCC 38.521-4 16.6.0 CR#269 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.1

revised [WTS] [JSN]
R5-210114 Update of Combinations of channel model parameters for R16 NR HST in B.2.2 CR

revised to R5-211823

CMCC 38.521-4 16.6.0 CR#270 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

revised [WTS] [JSN]
R5-210115 Update of Reference measurement channels for PDSCH performance requirements for R16 NR HST in A.3.2 CR

revised to R5-211824

CMCC 38.521-4 16.6.0 CR#271 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

revised [WTS] [JSN]
R5-210116 Update of Single Tap Channel Profile for R16 NR HST in B.3.1 CR

revised to R5-211825

CMCC 38.521-4 16.6.0 CR#272 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

revised [WTS] [JSN]
R5-210117 Editorial addition of editors notes in 6.3B.8.1.4, 6.3B.8.2.4 and 6.3B.8.3.4 CR

revised to R5-211870

CMCC, Qualcomm, Bureau Veritas, Ericsson, R&S, Huawei, CAICT, Apple 38.521-3 16.6.0 CR#843 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-210118 Addition of IMS over 5GS test case 7.27 CR

revised to R5-211421

ZTE Corporation 34.229-5 15.2.1 CR#74 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210119 Addition of IMS over 5GS test case 7.28 CR

revised to R5-211422

ZTE Corporation 34.229-5 15.2.1 CR#75 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210120 Addition of IMS over 5GS test case 7.29 CR

revised to R5-211423

ZTE Corporation 34.229-5 15.2.1 CR#76 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210121 Addition of IMS over 5GS test case 7.30 CR

revised to R5-211424

ZTE Corporation 34.229-5 15.2.1 CR#77 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210122 Addition of IMS over 5GS test case 7.31 CR

revised to R5-211425

ZTE Corporation 34.229-5 15.2.1 CR#78 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210123 Addition of IMS over 5GS test case 7.32 CR

revised to R5-211426

ZTE Corporation 34.229-5 15.2.1 CR#79 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210124 Addition of IMS over 5GS test case 7.33 CR

revised to R5-211427

ZTE Corporation 34.229-5 15.2.1 CR#80 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210125 Addition of IMS over 5GS test case 7.34 CR

revised to R5-211428

ZTE Corporation 34.229-5 15.2.1 CR#81 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210126 SR - NR_SON_MDT-UEConTest after RAN5#90-e WI status report CMCC, Ericsson NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210127 WP - NR_SON_MDT-UEConTest after RAN5#90-e Work Plan CMCC, Ericsson NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210128 Addition of new test case 8.1.6.1.1.1 for NR Immediate MDT CR

revised to R5-211477

CMCC 38.523-1 16.6.0 CR#1937 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210129 Addition of new test case 8.1.6.1.1.2 for NR L2 measurement CR

revised to R5-211478

CMCC 38.523-1 16.6.0 CR#1938 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210130 Applicability statement for new test cases for NR Immediate MDT CR

revised to R5-211487

CMCC 38.523-2 16.6.0 CR#110 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.4

revised [WTS] [JSN]
R5-210131 Correction of NR CA TC 8.1.4.1.7.x CR MediaTek Inc., Keysight Technologies 38.523-1 16.6.0 CR#1939 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.4

agreed [WTS] [JSN]
R5-210132 Correction of NR CA TC 8.1.4.1.9.x CR

revised to R5-211391

MediaTek Inc., Keysight Technologies 38.523-1 16.6.0 CR#1940 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.4

revised [WTS] [JSN]
R5-210133 Update of power level tables for Multilayer EPSFB TC 11.1.x CR MediaTek Inc. 38.523-1 16.6.0 CR#1941 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.1

agreed [WTS] [JSN]
R5-210134 Update of first preamble power for EN-DC TC 4.3.2.2.1 and 4.3.2.2.2 CR MediaTek Inc. 38.533 16.6.0 CR#999 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210135 Update of first preamble power for SA TC 6.3.2.2.1 and 6.3.2.2.2 CR MediaTek Inc. 38.533 16.6.0 CR#1000 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210136 Update of UE initial state for SA RLM TC 6.5.1.x CR MediaTek Inc. 38.533 16.6.0 CR#1001 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210137 Update of process delay for SFTD measurement TC 8.4.1.x CR MediaTek Inc. 38.533 16.6.0 CR#1002 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.5

agreed [WTS] [JSN]
R5-210138 Update of cell frequency for TC 6.7.2.2.2 CR MediaTek Inc. 38.533 16.6.0 CR#1003 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210139 PRD-17 on Guidance to Work Item Codes (post RAN#91-e version) other Samsung (Rapporteur) R5-90-e

AI: 7.3

reserved [WTS] [JSN]
R5-210140 TS 36.523-1 Tracker status before RAN5#90-e other Samsung (Rapporteur) R5-90-e

AI: 6.5.6

noted [WTS] [JSN]
R5-210141 TS 36.523-1 Tracker status after RAN5#90-e other Samsung (Rapporteur) R5-90-e

AI: 7.5

reserved [WTS] [JSN]
R5-210142 Editorial updates of TS 36.523-1 Section 6 CR

revised to R5-211341

Samsung 36.523-1 16.7.0 CR#4995 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.1

revised [WTS] [JSN]
R5-210143 Editorial updates of TS 36.523-1 Section 7.1 CR

revised to R5-211343

Samsung 36.523-1 16.7.0 CR#4996 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.2.1

revised [WTS] [JSN]
R5-210144 Editorial updates of TS 36.523-1 Sections 8.1 and 8.2 CR

revised to R5-211344

Samsung 36.523-1 16.7.0 CR#4997 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.3.1

revised [WTS] [JSN]
R5-210145 Editorial updates of TS 36.523-1 Section 8.3 CR

revised to R5-211346

Samsung 36.523-1 16.7.0 CR#4998 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.3.3

revised [WTS] [JSN]
R5-210146 Editorial updates of TS 36.523-1 Section 8.4 CR

revised to R5-211347

Samsung 36.523-1 16.7.0 CR#4999 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.3.4

revised [WTS] [JSN]
R5-210147 Editorial updates of TS 36.523-1 Section 9 CR

revised to R5-211348

Samsung 36.523-1 16.7.0 CR#5000 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.4

revised [WTS] [JSN]
R5-210148 Editorial updates of TS 36.523-1 Sections 10 to 13 CR

revised to R5-211349

Samsung 36.523-1 16.7.0 CR#5001 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.5

revised [WTS] [JSN]
R5-210149 Editorial updates of TS 36.523-1 Sections 15, 17 and 19 CR

revised to R5-211350

Samsung 36.523-1 16.7.0 CR#5002 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.11

revised [WTS] [JSN]
R5-210150 Editorial updates of TS 36.523-1 Sections 22 and 24 CR

revised to R5-211513

Samsung 36.523-1 16.7.0 CR#5003 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.11

revised [WTS] [JSN]
R5-210151 Aligning content of 36.523-2 with 36.523-1 CR

revised to R5-211351

Samsung 36.523-2 16.7.0 CR#1333 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.4

revised [WTS] [JSN]
R5-210152 Adding missing applicability for TC 8.2.2.14.1 CR

revised to R5-211448

Samsung 36.523-2 16.7.0 CR#1334 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 6.3.6.3

revised [WTS] [JSN]
R5-210153 Update to TC 13.1.22 MCPTT / Attach / Call setup CO CR

revised to R5-211512

Samsung 36.523-1 16.7.0 CR#5004 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.3.8

revised [WTS] [JSN]
R5-210154 Adding applicability for TC 13.1.22 MCPTT / Attach / Call setup CO CR

revised to R5-211352

Samsung 36.523-2 16.7.0 CR#1335 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.4

revised [WTS] [JSN]
R5-210155 TS 38.523-1 Tracker status before RAN5#90-e other Samsung (Rapporteur) R5-90-e

AI: 6.4.7

noted [WTS] [JSN]
R5-210156 TS 38.523-1 Tracker status after RAN5#90-e other Samsung (Rapporteur) R5-90-e

AI: 7.5

reserved [WTS] [JSN]
R5-210157 Editorial changes to 38.523-1 Section 6 CR

revised to R5-211377

Samsung 38.523-1 16.6.0 CR#1942 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

revised [WTS] [JSN]
R5-210158 Editorial changes to 38.523-1 Section 7 CR

revised to R5-211383

Samsung 38.523-1 16.6.0 CR#1943 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

revised [WTS] [JSN]
R5-210159 Editorial changes to 38.523-1 Section 8 CR Samsung 38.523-1 16.6.0 CR#1944 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.2

agreed [WTS] [JSN]
R5-210160 Editorial changes to 38.523-1 Sections 9-12 CR Samsung 38.523-1 16.6.0 CR#1945 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.3

agreed [WTS] [JSN]
R5-210161 Aligning content of 38.523-2 with 38.523-1 CR Samsung 38.523-2 16.6.0 CR#111 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

agreed [WTS] [JSN]
R5-210162 Adding missing applicability for TC 6.1.2.7 and 8.1.5.2.2 CR

revised to R5-211413

Samsung 38.523-2 16.6.0 CR#112 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

revised [WTS] [JSN]
R5-210163 Update of TC for IMS emergency TC 11.4.10 5GMM-REGISTERED.NORMAL-SERVICE N26 interface not supported N1 to S1 CR Samsung 38.523-1 16.6.0 CR#1946 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.4

agreed [WTS] [JSN]
R5-210164 Update to indication of Max nr cells in emergency test cases being active during test execution CR Samsung 38.523-1 16.6.0 CR#1947 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.4

agreed [WTS] [JSN]
R5-210165 Introduction of new IMS emergency TC 11.4.11 5GMM-REGISTERED.NORMAL-SERVICE N26 interface not supported S1 to N1 CR Samsung 38.523-1 16.6.0 CR#1948 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.4

agreed [WTS] [JSN]
R5-210166 Adding applicability for new IMS emergency TC 11.4.11 CR

revised to R5-211414

Samsung 38.523-2 16.6.0 CR#113 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

revised [WTS] [JSN]
R5-210167 MR-DC discussion

revised to R5-211323

Ericsson R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210168 New RAN5 PRD-19 on RAN5 WP Template other Samsung, Ericsson R5-90-e

AI: 4.3

approved [WTS] [JSN]
R5-210169 Addition of TC 7.3A.0.3.2.4 RIB,c for four bands CR CMCC 38.521-1 16.6.0 CR#1106 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

agreed [WTS] [JSN]
R5-210170 Update of TC 7.7A.3 CR CMCC 38.521-1 16.6.0 CR#1107 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

agreed [WTS] [JSN]
R5-210171 Editorial update of SS-RSRP for TC 6.7.1.2.1 CR MediaTek Inc. 38.533 16.6.0 CR#1004 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210172 Update of RRC message for TC 6.3.1.4, 6.3.1.5 and 6.3.2.3.2 CR

revised to R5-211726

MediaTek Inc. 38.533 16.6.0 CR#1005 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210173 Update of RRC message for TC 6.4.3.1 and 6.5.2.1 CR MediaTek Inc. 38.533 16.6.0 CR#1006 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210174 Update of Scell activation and CSI reporting time for EN-DC TC 4.5.3.1 CR

revised to R5-211614

MediaTek Inc. 38.533 16.6.0 CR#1007 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210175 Update of CSI reporting time for SA TC 6.5.3.1 CR

revised to R5-211625

MediaTek Inc. 38.533 16.6.0 CR#1008 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210176 Update of Scell activation and CSI reporting time for EN-DC TC 5.5.3.1 CR MediaTek Inc. 38.533 16.6.0 CR#1009 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

agreed [WTS] [JSN]
R5-210177 Update of CSI reporting time for SA TC 7.5.3.1 and 7.5.3.2 CR MediaTek Inc. 38.533 16.6.0 CR#1010 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

agreed [WTS] [JSN]
R5-210178 Update of PRACH configuration for SA TC 7.3.2.2.2 CR MediaTek Inc. 38.533 16.6.0 CR#1011 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

agreed [WTS] [JSN]
R5-210179 Update of PRACH configuration for EN-DC TC 4.5.5.3 and 4.5.5.4 CR MediaTek Inc. 38.533 16.6.0 CR#1012 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210180 Update of PRACH configuration for EN-DC TC 5.5.5.x CR MediaTek Inc. 38.533 16.6.0 CR#1013 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

agreed [WTS] [JSN]
R5-210181 Update of PRACH configuration for SA TC 6.5.5.3 and 6.5.5.4 CR MediaTek Inc. 38.533 16.6.0 CR#1014 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210182 Update of PRACH configuration for SA TC 7.5.5.x CR MediaTek Inc. 38.533 16.6.0 CR#1015 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

agreed [WTS] [JSN]
R5-210183 Update of prach-ConfigurationIndex for FR1 PRACH configuration 4 in A.7 CR MediaTek Inc. 38.533 16.6.0 CR#1016 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210184 Update of applicability for RRC TC 8.1.3.1.21 and 8.1.4.2.1.2 CR MediaTek Inc. 38.523-2 16.6.0 CR#114 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.5

withdrawn [WTS] [JSN]
R5-210185 SST and NG.116 discussion Ericsson R5-90-e

AI: 6.3.2.

noted [WTS] [JSN]
R5-210186 Update global conditions CR Ericsson 38.508-1 16.6.0 CR#1678 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-210187 Editorial update IE PhysicalCellGroupConfig CR Ericsson 38.508-1 16.6.0 CR#1679 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

withdrawn [WTS] [JSN]
R5-210188 New References CR ZTE Corporation 34.229-5 15.2.1 CR#82 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

withdrawn [WTS] [JSN]
R5-210189 Update test case 7.4, 7.5, 7.6 and 7.7 CR

revised to R5-211429

ZTE Corporation 34.229-5 15.2.1 CR#83 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210190 Update of 5G-NR test cases applicability CR

revised to R5-211415

Qualcomm Incorporated, Mediatek 38.523-2 16.6.0 CR#115 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

revised [WTS] [JSN]
R5-210191 Correction of NR test case 9.1.5.1.8 CR Qualcomm Incorporated, ANRITSU LTD 38.523-1 16.6.0 CR#1949 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.3

agreed [WTS] [JSN]
R5-210192 MCC TF160 Status Report report

revised to R5-211300

MCC TF160 R5-90-e

AI: 2.1

revised [WTS] [JSN]
R5-210193 RAN5 PRD12 version 6.5 other MCC TF160 R5-90-e

AI: 4.3

approved [WTS] [JSN]
R5-210194 Correction to test procedure 4.9.7 CR

revised to R5-211371

MCC TF160 38.508-1 16.6.0 CR#1680 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

revised [WTS] [JSN]
R5-210195 Corrections to test procedure 4.9.19 CR MCC TF160 38.508-1 16.6.0 CR#1681 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

withdrawn [WTS] [JSN]
R5-210196 Corrections to SMS test case 9.5 CR MCC TF160 34.229-5 15.2.1 CR#84 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-210197 Corrections to RLC test case 7.1.2.3.8 CR MCC TF160 38.523-1 16.6.0 CR#1950 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.3

agreed [WTS] [JSN]
R5-210198 Corrections to test case 11.3.1 CR MCC TF160 38.523-1 16.6.0 CR#1951 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.3

withdrawn [WTS] [JSN]
R5-210199 5G Test Models updates CR

revised to R5-211417

MCC TF160 38.523-3 16.0.0 CR#1568 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.6

revised [WTS] [JSN]
R5-210200 Corrections to test case 8.1.4.2.1.2 CR MCC TF160 38.523-1 16.6.0 CR#1952 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.4.4.1.4

agreed [WTS] [JSN]
R5-210201 MCPTT Packet Filter CR MCC TF160 36.508 16.7.0 CR#1341 catF TEI14_Test, MCPTT-ConTest Rel-16 R5-90-e

AI: 6.5.1

agreed [WTS] [JSN]
R5-210202 Corrections to SMS test case 18.b1, Annexes A.7.2 and A.7.8 CR MCC TF160 34.229-1 15.6.0 CR#1455 catF TEI8_Test Rel-15 R5-90-e

AI: 6.6.6.1

agreed [WTS] [JSN]
R5-210203 Routine maintenance for TS 34.229-3 CR MCC TF160 34.229-3 16.0.0 CR#669 catF TEI8_Test Rel-16 R5-90-e

AI: 6.6.6.3

agreed [WTS] [JSN]
R5-210204 Addition of a generic procedure for MCPTT radio bearer establishment for use of pre-established session CR

revised to R5-211517

MCC TF160 36.579-1 15.0.0 CR#100 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

revised [WTS] [JSN]
R5-210205 Correction to Generic Test Procedure for MCPTT CT group call establishment, manual commencement CR MCC TF160 36.579-1 15.0.0 CR#101 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210206 Correction to generic test procedure for MCPTT pre-established session establishment CR

revised to R5-211518

MCC TF160 36.579-1 15.0.0 CR#102 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

revised [WTS] [JSN]
R5-210207 New MCPTT generic test procedures CR MCC TF160, NIST, UPV/EHU, Nemergent Solutions 36.579-1 15.0.0 CR#103 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210208 Update to Default HTTP message - POST CR MCC TF160 36.579-1 15.0.0 CR#104 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210209 Update to Default Message Content - Floor Ack, Connect, Disconnect, Acknowledge CR MCC TF160 36.579-1 15.0.0 CR#105 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

withdrawn [WTS] [JSN]
R5-210210 Update to Default Message Content - INVITE CR MCC TF160 36.579-1 15.0.0 CR#106 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210211 Update to Default Message Content - Pidf CR MCC TF160 36.579-1 15.0.0 CR#107 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210212 Update to Default Message Content - REFER and Resource-List CR

revised to R5-211519

MCC TF160 36.579-1 15.0.0 CR#108 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

revised [WTS] [JSN]
R5-210213 Update to Default Message Content - SDP CR MCC TF160 36.579-1 15.0.0 CR#109 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210214 Update to Default Message Content - SIP 200 (OK) CR MCC TF160 36.579-1 15.0.0 CR#110 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210215 Update to Default Message Content - UPDATE CR MCC TF160 36.579-1 15.0.0 CR#111 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210216 Update to Default Message Content AFFILIATION-COMMAND CR MCC TF160 36.579-1 15.0.0 CR#112 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210217 Update to Default Message Content MIKEY-SAKKE I_MESSAGE CR MCC TF160 36.579-1 15.0.0 CR#113 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210218 Update to Default Message Content SIP 180 (Ringing) and SIP 183 (Session progress) CR MCC TF160 36.579-1 15.0.0 CR#114 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210219 Update to Default Message Content SIP MESSAGE CR MCC TF160 36.579-1 15.0.0 CR#115 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210220 Update to Default Message Content SUBSCRIBE CR MCC TF160 36.579-1 15.0.0 CR#116 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210221 Update to the MCS GKTP document CR MCC TF160 36.579-1 15.0.0 CR#117 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210222 Correction to MCPTT Test Case 5.1 CR MCC TF160 36.579-2 14.9.1 CR#108 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-210223 Correction to MCPTT Test Case 5.3 CR

revised to R5-211521

MCC TF160 36.579-2 14.9.1 CR#109 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210224 Correction to MCPTT Test Case 5.4 CR

revised to R5-211522

MCC TF160 36.579-2 14.9.1 CR#110 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210225 Correction to MCPTT Test Case 6.1.1.1 CR

revised to R5-211523

MCC TF160 36.579-2 14.9.1 CR#111 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210226 Correction to MCPTT Test Case 6.1.1.10 CR

revised to R5-211524

MCC TF160, NIST, UPV/EHU, Nemergent Solutions 36.579-2 14.9.1 CR#112 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210227 Correction to MCPTT Test Case 6.1.1.11 CR MCC TF160 36.579-2 14.9.1 CR#113 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-210228 Correction to MCPTT Test Case 6.1.1.12 CR MCC TF160 36.579-2 14.9.1 CR#114 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-210229 Correction to MCPTT Test Case 6.1.1.13 CR MCC TF160 36.579-2 14.9.1 CR#115 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-210230 Correction to MCPTT Test Case 6.1.1.14 CR MCC TF160 36.579-2 14.9.1 CR#116 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-210231 Correction to MCPTT Test Case 6.1.1.2 CR

revised to R5-211525

MCC TF160 36.579-2 14.9.1 CR#117 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210232 Correction to MCPTT Test Case 6.1.1.3 CR MCC TF160 36.579-2 14.9.1 CR#118 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-210233 Correction to MCPTT Test Case 6.1.1.5 CR

revised to R5-211526

MCC TF160 36.579-2 14.9.1 CR#119 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210234 Correction to MCPTT Test Case 6.1.1.8 CR

revised to R5-211527

MCC TF160 36.579-2 14.9.1 CR#120 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210235 Correction to MCPTT Test Case 6.1.1.9 CR MCC TF160 36.579-2 14.9.1 CR#121 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-210236 Correction to MCPTT Test Case 6.1.2.10 CR

revised to R5-211528

MCC TF160 36.579-2 14.9.1 CR#122 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210237 Correction to MCPTT Test Case 6.1.2.11 CR

revised to R5-211529

MCC TF160 36.579-2 14.9.1 CR#123 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210238 Correction to MCPTT Test Case 6.1.2.12 CR

revised to R5-211530

MCC TF160 36.579-2 14.9.1 CR#124 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210239 Correction to MCPTT Test Case 6.1.2.7 CR

revised to R5-211531

MCC TF160 36.579-2 14.9.1 CR#125 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210240 Correction to MCPTT Test Case 6.1.2.8 CR

revised to R5-211532

MCC TF160 36.579-2 14.9.1 CR#126 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210241 Correction to MCPTT Test Case 6.1.2.9 CR

revised to R5-211533

MCC TF160 36.579-2 14.9.1 CR#127 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210242 Correction to MCPTT Test Case 6.2.1 CR

revised to R5-211534

MCC TF160 36.579-2 14.9.1 CR#128 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210243 Correction to MCPTT Test Case 6.2.14 CR

revised to R5-211535

MCC TF160 36.579-2 14.9.1 CR#129 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210244 Correction to MCPTT Test Case 6.2.15 CR

revised to R5-211536

MCC TF160 36.579-2 14.9.1 CR#130 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210245 Correction to MCPTT Test Case 6.2.16 CR

revised to R5-211537

MCC TF160 36.579-2 14.9.1 CR#131 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210246 Correction to MCPTT Test Case 6.2.17 CR

revised to R5-211538

MCC TF160 36.579-2 14.9.1 CR#132 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210247 Correction to MCPTT Test Case 6.2.2 CR

revised to R5-211539

MCC TF160 36.579-2 14.9.1 CR#133 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210248 Correction to MCPTT Test Case 6.2.3 CR

revised to R5-211540

MCC TF160 36.579-2 14.9.1 CR#134 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210249 Correction to MCPTT Test Case 6.2.4 CR

revised to R5-211541

MCC TF160 36.579-2 14.9.1 CR#135 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210250 Correction to MCPTT Test Case 6.2.5 CR

revised to R5-211542

MCC TF160 36.579-2 14.9.1 CR#136 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210251 Correction to MCPTT Test Case 6.2.6 CR

revised to R5-211543

MCC TF160 36.579-2 14.9.1 CR#137 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210252 Correction to MCPTT Test Case 6.2.7 CR

revised to R5-211544

MCC TF160 36.579-2 14.9.1 CR#138 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

revised [WTS] [JSN]
R5-210253 Correction to MCPTT Test Case 6.2.8 CR MCC TF160 36.579-2 14.9.1 CR#139 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

withdrawn [WTS] [JSN]
R5-210254 Addition of missing MCX PICS CR

revised to R5-211545

MCC TF160 36.579-4 14.4.1 CR#12 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.4

revised [WTS] [JSN]
R5-210255 Routine maintenance for TS 36.579-5 CR MCC TF160 36.579-5 14.1.0 CR#12 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.5

agreed [WTS] [JSN]
R5-210256 Handling of optional KMS request security discussion MCC TF160 R5-90-e

AI: 6.6.9.9

noted [WTS] [JSN]
R5-210257 Issues with pre-established sessions discussion MCC TF160 R5-90-e

AI: 6.6.9.9

noted [WTS] [JSN]
R5-210258 Definition of values for epdu fields CR PCTEST Engineering Laboratory 37.571-2 16.6.0 CR#140 catF TEI9_Test Rel-16 R5-90-e

AI: 6.6.7.1

agreed [WTS] [JSN]
R5-210259 Corrections to A.11 CR ROHDE & SCHWARZ 34.229-5 15.2.1 CR#85 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-210260 Corrections and clarifications to default MBS, WLAN and Sensor assistance data in clause 5.4.1 CR PCTEST Engineering Laboratory 37.571-2 16.6.0 CR#141 catF TEI16_Test Rel-16 R5-90-e

AI: 6.6.7.1

agreed [WTS] [JSN]
R5-210261 Deletion of PICS for wlan-AP-Identifier CR PCTEST Engineering Laboratory 37.571-3 16.6.0 CR#132 catF TEI14_Test Rel-16 R5-90-e

AI: 6.6.7.2

agreed [WTS] [JSN]
R5-210262 Add support for new CA combos to Table 7.4A.8.4.1-1 and Table 7.4A.8.4.2-1 CR C Spire Wireless 36.521-1 16.7.0 CR#5244 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-210263 Editorial update IE PhysicalCellGroupConfig CR

revised to R5-211497

Ericsson 38.508-1 16.6.0 CR#1682 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

revised [WTS] [JSN]
R5-210264 Update IE FailureInformation CR Ericsson 38.508-1 16.6.0 CR#1683 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

withdrawn [WTS] [JSN]
R5-210265 Addition of NR-DC RRC TC 8.2.5.3.2 CR

revised to R5-211398

Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#1953 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.5

revised [WTS] [JSN]
R5-210266 Addition of NR-DC RRC TC 8.2.5.4.2 CR

revised to R5-211399

Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#1954 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.5

revised [WTS] [JSN]
R5-210267 Update to 5GC NAS TC 9.1.5.2.9 CR Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#1955 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.3

withdrawn [WTS] [JSN]
R5-210268 Correction to EPS Fallback Test Case 11.1.1 CR

revised to R5-211547

Qualcomm CDMA Technologies, Anritsu 38.523-1 16.6.0 CR#1956 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.1

revised [WTS] [JSN]
R5-210269 Correction to Annex A.9 EPS Fallback for Voice Call / 5GS CR Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#86 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.

withdrawn [WTS] [JSN]
R5-210270 Correction to IMS over 5GS TC 6.2 CR Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#87 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.

withdrawn [WTS] [JSN]
R5-210271 Correction to IMS over 5GS TC 7.2 CR Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#88 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.

withdrawn [WTS] [JSN]
R5-210272 Correction to IMS over 5GS TC 7.11 CR Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#89 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.

withdrawn [WTS] [JSN]
R5-210273 WP UE Conformance Test Aspects - Rel-16 Private Network Support for NG-RAN Work Plan Qualcomm CDMA Technologies NG_RAN_PRN_Vertical_LAN-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210274 SR UE Conformance Test Aspects - Rel-16 Private Network Support for NG-RAN WI status report Qualcomm CDMA Technologies NG_RAN_PRN_Vertical_LAN-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210275 WP UE Conformance Test Aspects - Rel-16 Optimisations on UE radio capability signalling – NR/E-UTRA Work Plan Qualcomm CDMA Technologies RACS-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210276 SR UE Conformance Test Aspects - Rel-16 Optimisations on UE radio capability signalling – NR/E-UTRA WI status report Qualcomm CDMA Technologies RACS-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210277 Discussion paper for RRC Segmentation in Rel-16 RACS discussion

revised to R5-211324

Qualcomm CDMA Technologies RACS-UEConTest Rel-16 R5-90-e

AI: 6.3.20.

revised [WTS] [JSN]
R5-210278 Revised WID - Rel-16 Optimisations on UE radio capability signalling – NR/E-UTRA WID revised

revised to R5-211364

Qualcomm CDMA Technologies RACS-UEConTest Rel-16 R5-90-e

AI: 7.4.2

revised [WTS] [JSN]
R5-210279 Addition of minimum conformance requirements for R16 NR HST cell re-selection in 6.1.1.0 CR CMCC 38.533 16.6.0 CR#1017 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-210280 Addition of new test case 6.1.1.7 for R16 NR HST CR

revised to R5-211827

CMCC 38.533 16.6.0 CR#1018 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

revised [WTS] [JSN]
R5-210281 Addition of minimum conformance requirements for R16 NR HST measurement in 6.6.1.0 CR CMCC 38.533 16.6.0 CR#1019 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-210282 Addition of new test case 6.6.1.7 for R16 NR HST CR

revised to R5-211828

CMCC 38.533 16.6.0 CR#1020 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

revised [WTS] [JSN]
R5-210283 Update of Annex H.2.1-3 for R16 NR HST CR CMCC 38.533 16.6.0 CR#1021 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-210284 Addition of cell configuration mapping in Annex E for R16 NR HST CR

revised to R5-211829

CMCC 38.533 16.6.0 CR#1022 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

revised [WTS] [JSN]
R5-210285 Addition of common ICS in A.4.3.11 for Rel-16 HST CR

revised to R5-211815

CMCC 38.508-2 16.6.0 CR#142 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.2

revised [WTS] [JSN]
R5-210286 Discussion about n259 OBW relaxation discussion

revised to R5-211951

DOCOMO Communications Lab. NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.

revised [WTS] [JSN]
R5-210287 Revised WID on UE Conformance Test Aspects for SON and MDT support for NR WID revised

revised to R5-211365

CMCC, Ericsson NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 7.4.2

revised [WTS] [JSN]
R5-210288 Introduction of definition of common environment for R16 NR Immediate MDT CR

revised to R5-211467

CMCC, ZTE 38.508-1 16.6.0 CR#1684 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.1

revised [WTS] [JSN]
R5-210289 Introduction of common implementation conformance statements for R16 NR SON and MDT CR

revised to R5-211469

CMCC, ZTE, MediaTek Inc, HiSilicon 38.508-2 16.6.0 CR#143 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.2

revised [WTS] [JSN]
R5-210290 Clarification of uplink power measurement uncertainty in test case 6.3.4.3 CR Keysight Technologies UK Ltd 38.521-1 16.6.0 CR#1108 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.3

agreed [WTS] [JSN]
R5-210291 Message exceptions definition in test case 6.2.2 CR Keysight Technologies UK Ltd 38.521-1 16.6.0 CR#1109 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-210292 Clarifications for ON/OFF time mask for UL MIMO test case CR

revised to R5-211676

Keysight Technologies UK Ltd 38.521-1 16.6.0 CR#1110 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-210293 New FR2 Common Uplink Configurations definition in section 6 CR Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#452 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

withdrawn [WTS] [JSN]
R5-210294 ACS FR2 test case update CR

revised to R5-211868

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#453 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.2

revised [WTS] [JSN]
R5-210295 IBB FR2 test case update CR

revised to R5-211869

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#454 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.2

revised [WTS] [JSN]
R5-210296 MU and TT definition for REFSENS FR2 CA test cases CR

revised to R5-211922

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#455 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

revised [WTS] [JSN]
R5-210297 Editorial corrections in Occupied bandwidth test procedure CR

revised to R5-211683

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#456 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210298 Spectrum emissions mask for intra-band non-contiguous EN-DC Test Definition CR

revised to R5-211694

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#844 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-210299 Correction of LTE frequency for 19-n79 combo in 7.3B.2.3 CR

revised to R5-211874

Keysight Technologies UK Ltd, Ericsson 38.521-3 16.6.0 CR#845 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-210300 Correction in Refsens test case 7.3B.2.3_1.1 for DC_1A-7A_n78A combo CR Keysight Technologies UK Ltd, Ericsson 38.521-3 16.6.0 CR#846 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

withdrawn [WTS] [JSN]
R5-210301 Completion of OBW intra-band non-contiguous test 6.5B.1.2 CR Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#847 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210302 Addition of new test case 6.5B.1.4D OBW for inter-band EN-DC FR2 UL MIMO CR Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#848 catB 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210303 ACLR for intra-band non-contiguous EN-DC Test Definition CR

revised to R5-211695

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#849 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-210304 Updates on configured Output Power Level for EN-DC test cases 6.2B.4.1.1.x CR Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#850 catF TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

withdrawn [WTS] [JSN]
R5-210305 MU definition for UE MOP for Inter-Band EN-DC including FR2 (3CCs) CR

revised to R5-211926

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#851 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.3

revised [WTS] [JSN]
R5-210306 MU and TT defintion for REFSENS EN-DC including FR2 up to 5CCs CR

revised to R5-211927

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#852 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.3

revised [WTS] [JSN]
R5-210307 Adjacent Channel Selectivity FR2 MU definition in 38.903 CR

revised to R5-211930

Keysight Technologies UK Ltd 38.903 16.6.0 CR#191 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210308 In-band Blocking FR2 MU definition in 38.903 CR

revised to R5-211931

Keysight Technologies UK Ltd 38.903 16.6.0 CR#192 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210309 TP analysis for 38.521-3 test case 6.5B.2.2.1 SEM Intra-band non-contiguous CR

revised to R5-211734

Keysight Technologies UK Ltd 38.905 16.6.0 CR#341 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-210310 TP analysis for 38.521-3 test case 6.5B.2.2.3 ACLR Intra-band non-contiguous CR

revised to R5-211735

Keysight Technologies UK Ltd 38.905 16.6.0 CR#342 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-210311 On ACS and IBB FR2 MU definition discussion

revised to R5-211943

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-210312 On minimum requirements for Transmit ON/OFF time mask in UL MIMO FR1 discussion

revised to R5-211850

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-210313 LS on minimum requirements for Transmit ON/OFF time mask in UL MIMO FR1 LS out

LS To: TSG WG RAN4

revised to R5-211826

TSG WG RAN5 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 5.7

revised [WTS] [JSN]
R5-210314 Updating Contents of RRC messages for Logged MDT test cases CR

revised to R5-211468

ZTE Corporation, CMCC 38.508-1 16.6.0 CR#1685 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.1

revised [WTS] [JSN]
R5-210315 Adding applicability for new logged MDT test cases CR

revised to R5-211488

ZTE Corporation, CMCC 38.523-2 16.6.0 CR#116 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.4

revised [WTS] [JSN]
R5-210316 Update UE Positioning test mode procedures and UE Positioning messages draftCR

revised to R5-211490

ZTE Corporation NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.6

revised [WTS] [JSN]
R5-210317 Discussion paper on IMS over 5GS test case 7.3 regarding flexible use of preconditions discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

noted [WTS] [JSN]
R5-210318 Correction to E-UTRA link setup for NSA testing CR

revised to R5-211719

ROHDE & SCHWARZ 38.521-4 16.6.0 CR#273 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.4

revised [WTS] [JSN]
R5-210319 Update to references clause CR MCC TF160 36.579-1 15.0.0 CR#118 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210320 Correction to NR Idle mode test cases CR Keysight Technologies UK Ltd, Qualcomm 38.523-1 16.6.0 CR#1957 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-210321 Correction to UL-SCH TBS selection test cases common clause 7.1.1.4.2.0 CR Keysight Technologies UK, Samsung 38.523-1 16.6.0 CR#1958 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-210322 Correction to 5GMM Initial Registration test cases CR Keysight Technologies UK Ltd, Qualcomm 38.523-1 16.6.0 CR#1959 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.3

agreed [WTS] [JSN]
R5-210323 Correction to annexure A.3.1 CR

revised to R5-211353

Keysight Technologies UK, MCC TF160, Qualcomm 34.229-1 15.6.0 CR#1456 catF TEI14_Test, EIEI-UEConTest Rel-15 R5-90-e

AI: 6.6.6.1

revised [WTS] [JSN]
R5-210324 Clarification of conditions used in INVITE for eCall setup CR Keysight Technologies UK, MCC TF160, Qualcomm 34.229-1 15.6.0 CR#1457 catF TEI14_Test, EIEI-UEConTest Rel-15 R5-90-e

AI: 6.6.6.1

agreed [WTS] [JSN]
R5-210325 Editorial update IE DLDedicatedMessageSegment CR Ericsson 38.508-1 16.6.0 CR#1686 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

withdrawn [WTS] [JSN]
R5-210326 Editorial update DLDedicatedMessageSegment message CR Ericsson 38.508-1 16.6.0 CR#1687 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

withdrawn [WTS] [JSN]
R5-210327 Update FailureInformation message CR Ericsson 38.508-1 16.6.0 CR#1688 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-210328 Editorial update RRCReconfiguration message CR Ericsson 38.508-1 16.6.0 CR#1689 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

agreed [WTS] [JSN]
R5-210329 Addition of UE power saving test case 7.1.1.12.2 CR CATT 38.523-1 16.6.0 CR#1960 catF NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.4

withdrawn [WTS] [JSN]
R5-210330 Addition of new test cases 7.1.1.12.4, 7.1.1.12.5 and 7.1.1.12.6 for UE power saving in NR CR CATT 38.523-1 16.6.0 CR#1961 catF NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.4

withdrawn [WTS] [JSN]
R5-210331 Adding scell dormancy indication outside active time to physical layer baseline implementation capabilities CR

revised to R5-211463

CATT 38.508-2 16.6.0 CR#144 catF NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.2

revised [WTS] [JSN]
R5-210332 Addition of test applicabilities for UE power saving in NR CR

revised to R5-211464

CATT 38.523-2 16.6.0 CR#117 catF NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.5

revised [WTS] [JSN]
R5-210333 Correction test purpose to MAC test case 7.1.1.12.1 CR CATT 38.523-1 16.6.0 CR#1962 catF NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.4

withdrawn [WTS] [JSN]
R5-210334 Work plan: UE Conformance Test Aspects for NR Positioning Support Work Plan CATT NR_pos-UEConTest R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210335 SR UE Conformance Test Aspects - NR Positioning Support WI status report CATT NR_pos-UEConTest R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210336 Work plan: B1C Signal in BDS Positioning System Support for LTE and NR Work Plan CATT B1C_BDS_pos_UEConTest R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210337 SR UE Conformance Test Aspects - B1C Signal in BDS Positioning System Support for LTE and NR WI status report CATT B1C_BDS_pos_UEConTest R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210338 Work plan: UE Conformance Test Aspects – UE power saving in NR Work Plan CATT NR_UE_pow_sav-UEConTest R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210339 SR UE Conformance Test Aspects - UE power saving in NR WI status report CATT NR_UE_pow_sav-UEConTest R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210340 WP UE Conformance Test Aspects – Further NB-IoT enhancements Work Plan CATT NB_IOTenh2-UEConTest R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210341 SR UE Conformance Test Aspects - Further NB-IoT enhancements WI status report CATT NB_IOTenh2-UEConTest R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210342 Correction to NB-IoT Common contents of system information messages CR CATT, TDIA 36.508 16.7.0 CR#1342 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 6.3.10.1

agreed [WTS] [JSN]
R5-210343 Corrections and extensions to test case 7.4 CR ROHDE & SCHWARZ 34.229-5 15.2.1 CR#90 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-210344 Introduction of a new test case for voice fallback indication under EPS Fallback with handover CR

revised to R5-211503

CATT, TDIA 38.523-1 16.6.0 CR#1963 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.4.11.1

revised [WTS] [JSN]
R5-210345 Update to applicabilities for the EPS fallback test cases CR

revised to R5-211504

CATT, TDIA 38.523-2 16.6.0 CR#118 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.5

revised [WTS] [JSN]
R5-210346 Adding NG.114 dependencies and PICS for test case 7.4 CR ROHDE & SCHWARZ 34.229-2 15.5.0 CR#280 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.8

agreed [WTS] [JSN]
R5-210347 Adding NG.114 dependencies to Annex A.2.1 CR

revised to R5-211418

ROHDE & SCHWARZ 34.229-1 15.6.0 CR#1458 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.7

revised [WTS] [JSN]
R5-210348 Adding NG.114 dependencies to Annex A.4 CR ROHDE & SCHWARZ 34.229-5 15.2.1 CR#91 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-210349 Addition of 3 band EN-DC Test Frequency (DC_1A-8A_n78A, DC_3A-8A_n78A) CR

revised to R5-211661

KT Corp. 38.508-1 16.6.0 CR#1690 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

revised [WTS] [JSN]
R5-210350 Addition of 4 band EN-DC Test Frequency (DC_1A-3A-8A_n78A) CR

revised to R5-211662

KT Corp. 38.508-1 16.6.0 CR#1691 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

revised [WTS] [JSN]
R5-210351 Correction of MSD test point on Table 7.3B.2.0.3.5.2-1 DC_1A-8A_n78A CR

revised to R5-211710

KT Corp. 38.521-3 16.6.0 CR#853 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-210352 Update of 7.3B.2.3_1.1 RefSens DC_3A-8A_n78A CR

revised to R5-211711

KT Corp. 38.521-3 16.6.0 CR#854 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-210353 Update of Table A.4.3.2B.2.3.2-2 (DC_1A-8A_n78A, DC_3A-8A_n78A) CR

revised to R5-211859

KT Corp. 38.508-2 16.6.0 CR#145 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

revised [WTS] [JSN]
R5-210354 Update of Table A.4.3.2B.2.3.3-2 (DC_1A-3A-8A_n78A) CR

revised to R5-211860

KT Corp. 38.508-2 16.6.0 CR#146 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

revised [WTS] [JSN]
R5-210355 Guidelines on test execution for bands n14 and n53 CR MCC TF160, Nokia, AT&T 38.523-3 16.0.0 CR#1570 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 6.3.9.3

agreed [WTS] [JSN]
R5-210356 Corrections to test case 11.3.1 CR ROHDE & SCHWARZ, MCC TF160 38.523-1 16.6.0 CR#1964 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.3

agreed [WTS] [JSN]
R5-210357 Editorial corrections to TS 34.229-5 CR

revised to R5-211430

ROHDE & SCHWARZ 34.229-5 15.2.1 CR#92 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210358 Addition of new test case 7.3B.4 for EIS Spherical Coverage CR

revised to R5-211712

ROHDE & SCHWARZ 38.521-3 16.6.0 CR#855 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-210359 Editorial update SidelinkUEInformationNR message CR Ericsson 38.508-1 16.6.0 CR#1692 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-210360 Correction to NR5G PDCP TC 7.1.3.1.1 and 7.1.3.1.2 CR Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#1965 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.4

withdrawn [WTS] [JSN]
R5-210361 Correction to NR5G RRC TC 8.1.1.3.3 CR Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#1966 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.1

agreed [WTS] [JSN]
R5-210362 Correction to NR5G TCs 8.1.X on SINR reporting CR

revised to R5-211389

Qualcomm CDMA Technologies, Mediatek 38.523-1 16.6.0 CR#1967 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

revised [WTS] [JSN]
R5-210363 Correction to NR5G Idle mode TCs CR

revised to R5-211378

Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#1968 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

revised [WTS] [JSN]
R5-210364 Correction to NR5G UAC TC 11.3.4 CR

revised to R5-211408

Qualcomm CDMA Technologies, Keysight 38.523-1 16.6.0 CR#1969 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.3

revised [WTS] [JSN]
R5-210365 Correction to NR-DC RRC TC 8.2.5.1.2 CR

revised to R5-211400

Qualcomm CDMA Technologies, TDIA, CATT 38.523-1 16.6.0 CR#1970 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.5

revised [WTS] [JSN]
R5-210366 Correction to NR-DC RRC TC 8.2.5.2.2 CR Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#1971 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.5

agreed [WTS] [JSN]
R5-210367 Correction to NR5G RRC IRAT TC 8.1.4.2.1.1 CR Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#1972 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.4

agreed [WTS] [JSN]
R5-210368 Correction to IMS over 5GS TC 7.3 CR Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#93 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

withdrawn [WTS] [JSN]
R5-210369 Addition of IMS over 5GS TC 7.14 CR

revised to R5-211431

Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#94 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210370 Addition of RACS RRC TC 8.1.5.9.1 CR Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#1973 catF RACS-UEConTest Rel-16 R5-90-e

AI: 6.3.20.3

withdrawn [WTS] [JSN]
R5-210371 Updates to SIB1 and SIB10 for Rel-16 NPN CR

revised to R5-211465

Qualcomm CDMA Technologies 38.508-1 16.6.0 CR#1693 catF NG_RAN_PRN_Vertical_LAN-UEConTest Rel-16 R5-90-e

AI: 6.3.19.1

revised [WTS] [JSN]
R5-210372 Addition of UAI test function CR Qualcomm CDMA Technologies 38.509 15.9.0 CR#32 catB NR_UE_pow_sav-UEConTest Rel-15 R5-90-e

AI: 6.3.18.3

revised [WTS] [JSN]
R5-210373 Addition of System information combination for Rel-16 NPN CR

revised to R5-211466

Qualcomm CDMA Technologies 38.508-1 16.6.0 CR#1694 catF NG_RAN_PRN_Vertical_LAN-UEConTest Rel-16 R5-90-e

AI: 6.3.19.1

revised [WTS] [JSN]
R5-210374 Addition of NID information for Rel-16 NPN CR

revised to R5-211548

Qualcomm CDMA Technologies 38.508-1 16.6.0 CR#1695 catF NG_RAN_PRN_Vertical_LAN-UEConTest Rel-16 R5-90-e

AI: 6.3.19.1

revised [WTS] [JSN]
R5-210375 Updates to NAS messages for Rel-16 NPN CR Qualcomm CDMA Technologies 38.508-1 16.6.0 CR#1696 catF NG_RAN_PRN_Vertical_LAN-UEConTest Rel-16 R5-90-e

AI: 6.3.19.1

withdrawn [WTS] [JSN]
R5-210376 Addition of test function Set UE Capability Info draftCR

revised to R5-211550

Qualcomm CDMA Technologies RACS-UEConTest Rel-16 R5-90-e

AI: 6.3.20.

revised [WTS] [JSN]
R5-210377 Correction of TRS numeric symbol CR Intertek 37.544 16.0.0 CR#30 catF TEI14_Test Rel-16 R5-90-e

AI: 5.6.15

agreed [WTS] [JSN]
R5-210378 Update of RRC TC 8.2.3.12.1 CR Intertek 38.523-1 16.6.0 CR#1974 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

agreed [WTS] [JSN]
R5-210379 Update of RRC TC 8.1.5.6.5.1 CR Intertek 38.523-1 16.6.0 CR#1975 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

agreed [WTS] [JSN]
R5-210380 Update of 7.5A.3 Adjacent channel selectivity for 4DL CA CR China Telecommunications 38.521-1 16.6.0 CR#1111 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

withdrawn [WTS] [JSN]
R5-210381 Update of 7.5A.3 Adjacent channel selectivity for 4DL CA CR China Telecommunications 38.521-1 16.6.0 CR#1112 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

withdrawn [WTS] [JSN]
R5-210382 Update of 7.5A.3 Adjacent channel selectivity for 4DL CA CR

revised to R5-211764

China Telecommunications 38.521-1 16.6.0 CR#1113 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

revised [WTS] [JSN]
R5-210383 Correct a tpyo of 6.3A.4.2 CR Guangdong OPPO Mobile Telecom. 38.905 16.6.0 CR#343 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.8

agreed [WTS] [JSN]
R5-210384 Add TT to power control for UL CA CR Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1114 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.1

agreed [WTS] [JSN]
R5-210385 Update MU/TT on power control for UL CA CR Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1115 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.3

agreed [WTS] [JSN]
R5-210386 Update Test description of 6.5B.1.1 CR

revised to R5-211696

Guangdong OPPO Mobile Telecom. 38.521-3 16.6.0 CR#856 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-210387 Correction to EN-DC OoB emissions CR ROHDE & SCHWARZ 38.521-3 16.6.0 CR#857 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210388 Correction to 11.4.2 and 11.4.3 CR

revised to R5-211411

MediaTek Inc. 38.523-1 16.6.0 CR#1976 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.4

revised [WTS] [JSN]
R5-210389 Correction to MR-DC test case 8.2.3.2.1 CR Guangdong OPPO Mobile Telecom. 38.523-1 16.6.0 CR#1977 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

agreed [WTS] [JSN]
R5-210390 Correction to MR-DC test case 8.2.3.6.1a and 8.2.3.6.1b CR Guangdong OPPO Mobile Telecom. 38.523-1 16.6.0 CR#1978 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

agreed [WTS] [JSN]
R5-210391 Correction to MR-DC test case 8.2.3.7.1 CR

revised to R5-211396

Guangdong OPPO Mobile Telecom. 38.523-1 16.6.0 CR#1979 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

revised [WTS] [JSN]
R5-210392 Correction to MR-DC test case 8.2.3.9.1 CR Guangdong OPPO Mobile Telecom. 38.523-1 16.6.0 CR#1980 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

agreed [WTS] [JSN]
R5-210393 Addition and update of PICS CR

revised to R5-211376

Lenovo, Motorola Mobility, Qualcomm 38.508-2 16.6.0 CR#147 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.2

revised [WTS] [JSN]
R5-210394 Editorial update UEAssistanceInformation message CR Ericsson 38.508-1 16.6.0 CR#1697 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-210395 SR UE Conformance Test Aspects - Additional LTE bands for UE category M2 and/or NB2 in Rel-16 WI status report Ericsson LTE_bands_R16_M2_NB2-UEConTest R5-90-e

AI: 7.4.2

noted [WTS] [JSN]
R5-210396 WP UE Conformance Test Aspects - Additional LTE bands for UE category M2 and/or NB2 in Rel-16 Work Plan Ericsson LTE_bands_R16_M2_NB2-UEConTest R5-90-e

AI: 7.4.2

noted [WTS] [JSN]
R5-210397 Correction to NR-DC Test case 8.2.2.8.2 CR ANRITSU LTD 38.523-1 16.6.0 CR#1981 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

agreed [WTS] [JSN]
R5-210398 Correction to NR5GC NAS test cases for handling additional PDN CR ANRITSU LTD 38.523-1 16.6.0 CR#1982 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.6.3

agreed [WTS] [JSN]
R5-210399 Inclusion of SK-Counter IE in RRCConnectionReconfiguration CR ANRITSU LTD 36.508 16.7.0 CR#1343 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.11

agreed [WTS] [JSN]
R5-210400 FR2 Measurement Uncertainty (MU) and Test Tolerances (TT) Target Completion Update discussion AT&T 5GS_NR_LTE-UEConTest R5-90-e

AI: 7.5

available [WTS] [JSN]
R5-210401 Correction to NR Idle mode test case 6.1.1.6 CR Keysight Technologies UK 38.523-1 16.6.0 CR#1983 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-210402 Correction to RRC IDLE procedures CR

revised to R5-211372

Keysight Technologies UK, Qualcomm 38.508-1 16.6.0 CR#1698 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

revised [WTS] [JSN]
R5-210403 Addition of the definition of CA capability with 6DL and 7DL CCs CR

revised to R5-211751

LG Electronics 36.521-1 16.7.0 CR#5245 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

revised [WTS] [JSN]
R5-210404 Introduction of FDD PDSCH Closed Loop Multi Layer Spatial Multiplexing 4x2 for CA (7DL CA) CR LG Electronics 36.521-1 16.7.0 CR#5246 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-210405 Introduction of FDD PDSCH Open Loop Spatial Multiplexing 2x2 for CA (7DL CA) CR LG Electronics 36.521-1 16.7.0 CR#5247 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-210406 Introduction of FDD PDSCH Single Antenna Port Performance for CA (7DL CA) CR LG Electronics 36.521-1 16.7.0 CR#5248 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-210407 Update to Applicability and test rules for different CA configurations for 6DL CA test cases CR LG Electronics 36.521-1 16.7.0 CR#5249 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-210408 Update to applicability TDD FDD 7DL CA Peformance test cases CR

revised to R5-211752

LG Electronics 36.521-2 16.7.0 CR#947 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.3

revised [WTS] [JSN]
R5-210409 Update to TDD FDD 7DL CA PDSCH Closed Loop Multi Layer Spatial Multiplexing 4x2 Performance test cases CR LG Electronics 36.521-1 16.7.0 CR#5250 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-210410 Update to TDD FDD 7DL CA PDSCH Open Loop Spatial Multiplexing 2x2 Performance test cases CR LG Electronics 36.521-1 16.7.0 CR#5251 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-210411 Update to TDD FDD 7DL CA Single Antenna Port Performance test cases CR LG Electronics 36.521-1 16.7.0 CR#5252 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-210412 Addition of a new test case for 5G-SRVCC from NG-RAN to 3GPP UTRAN CR

revised to R5-211493

CATT, TDIA 38.523-1 16.6.0 CR#1984 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.3

revised [WTS] [JSN]
R5-210413 Addition of the applicability for new test case for 5G-SRVCC from NG-RAN to 3GPP UTRAN CR CATT, TDIA 38.523-2 16.6.0 CR#119 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.4

withdrawn [WTS] [JSN]
R5-210414 Update UECapabilityEnquiry message CR Ericsson 38.508-1 16.6.0 CR#1699 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-210415 Addition of new test case 6.4B.2.4.3_1.1 In-band Emissions for inter-band EN-DC including FR2 with 3 CCs CR LG Electronics 38.521-3 16.6.0 CR#858 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210416 Addition of new test case 6.4B.2.4.3_1.2 In-band Emissions for inter-band EN-DC including FR2 with 4 CCs CR LG Electronics 38.521-3 16.6.0 CR#859 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210417 Addition of new test case 6.4B.2.4.3_1.3 In-band Emissions for inter-band EN-DC including FR2 with 5 CCs CR LG Electronics 38.521-3 16.6.0 CR#860 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210418 Update of minimum conformance requirements for 4Rx FDD FR1 PDSCH in TC 5.2.3.1.1_1 CR

revised to R5-211816

LG Electronics 38.521-4 16.6.0 CR#274 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3

revised [WTS] [JSN]
R5-210419 Addition of new test case 6.4E.2.2.1 Error Vector Magnitude for V2X for non-concurrent operation CR LG Electronics 38.521-1 16.6.0 CR#1116 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

agreed [WTS] [JSN]
R5-210420 Discussion on equal PSD and PCC prioritization for UL CA test discussion

revised to R5-211937

Guangdong OPPO Mobile Telecom. 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-210421 Addition of Cell configurations for 5G-SRVCC from NG-RAN to UTRAN CR

revised to R5-211491

CATT, TDIA 38.508-1 16.6.0 CR#1700 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.1

revised [WTS] [JSN]
R5-210422 Addition of 6.5E.2.2.1 CR

revised to R5-211806

Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1117 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

revised [WTS] [JSN]
R5-210423 Addition of 6.5E.2.2.1D CR Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1118 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

agreed [WTS] [JSN]
R5-210424 Addition of 6.5E.2.3.1 CR Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1119 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

agreed [WTS] [JSN]
R5-210425 Addition of 6.5E.2.3.1D CR Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1120 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

agreed [WTS] [JSN]
R5-210426 Addition of 6.5E.2.4.1 CR Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1121 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

agreed [WTS] [JSN]
R5-210427 Addition of 6.5E.2.4.1D CR Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1122 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

agreed [WTS] [JSN]
R5-210428 Addition of 6.5E.3.2.1 CR Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1123 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

agreed [WTS] [JSN]
R5-210429 Addition of 6.5E.3.2.1D CR Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#1124 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

agreed [WTS] [JSN]
R5-210430 Addition of new NAS Test case 9.1.9.2 for testing RACS UE Configuration Update CR Tech Mahindra Limited 38.523-1 16.6.0 CR#1985 catF RACS-UEConTest Rel-16 R5-90-e

AI: 6.3.20.3

agreed [WTS] [JSN]
R5-210431 Test tolerance analysis for 7.4.3.1 and 5.4.3.1 CR ROHDE & SCHWARZ 38.903 16.6.0 CR#193 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-210432 Update 5.4.3.1 with TT analysis results CR

revised to R5-211622

ROHDE & SCHWARZ 38.533 16.6.0 CR#1023 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

revised [WTS] [JSN]
R5-210433 Update Annex F for 5.4.3.1 and 7.4.3.1 with TT analysis results CR

revised to R5-211636

ROHDE & SCHWARZ 38.533 16.6.0 CR#1024 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

revised [WTS] [JSN]
R5-210434 Correct cell mapping for 5.4.3.1 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1025 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210435 Test tolerance analysis for 4.5.7.1 CR

revised to R5-211642

ROHDE & SCHWARZ 38.903 16.6.0 CR#194 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210436 Complete RRM 4.5.7.1 including TT analysis results CR

revised to R5-211615

ROHDE & SCHWARZ 38.533 16.6.0 CR#1026 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210437 Annex E and F 4.5.7.1 PSCell addition test CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1027 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210438 Update TT analyses for FR2 iRAT measurement accuracy test cases CR ROHDE & SCHWARZ 38.903 16.6.0 CR#195 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-210439 Complete FR2 iRAT measurement accuracy test cases CR

revised to R5-211635

ROHDE & SCHWARZ 38.533 16.6.0 CR#1028 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.5

revised [WTS] [JSN]
R5-210440 Update of TT analysis results in Annex F for FR2 iRAT test cases CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1029 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210441 Update SS-RSRP measurement accuracy TT analyses for SNR uncertainty change CR

revised to R5-211643

ROHDE & SCHWARZ 38.903 16.6.0 CR#196 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210442 Update TT results for SS-RSRP measurement accuracy test cases chapter 4 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1030 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210443 Update TT results for SS-RSRP measurement accuracy test cases chapter 6 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1031 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210444 Update TT results for SS-RSRP measurement accuracy test cases Annex F CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1032 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210445 Update SS-RSRQ measurement accuracy TT analyses for SNR uncertainty change CR ROHDE & SCHWARZ 38.903 16.6.0 CR#197 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-210446 Update TT results for SS-RSRQ measurement accuracy test cases chapter 4 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1033 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210447 Update TT results for SS-RSRQ measurement accuracy test cases chapter 6 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1034 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210448 Update TT results for SS-RSRQ measurement accuracy test cases Annex F CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1035 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210449 Correct 6.3.1.1 TT analysis CR

revised to R5-211892

ROHDE & SCHWARZ 38.903 16.6.0 CR#198 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210450 Update TT results for 6.3.1.1 CR

revised to R5-211889

ROHDE & SCHWARZ 38.533 16.6.0 CR#1036 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210451 Update TT results for 6.3.1.1 Annex F CR

revised to R5-211890

ROHDE & SCHWARZ 38.533 16.6.0 CR#1037 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

revised [WTS] [JSN]
R5-210452 On the DL AWGN MTSU for RRM discussion

revised to R5-211653

ROHDE & SCHWARZ R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-210453 Update DL AWGN MU for RRM FR2 CR

revised to R5-211637

ROHDE & SCHWARZ 38.533 16.6.0 CR#1038 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

revised [WTS] [JSN]
R5-210454 Update RRM MU values for FR2 CR

revised to R5-211644

ROHDE & SCHWARZ 38.903 16.6.0 CR#199 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210455 Update text in permitted test setups for RRM FR2 CR ROHDE & SCHWARZ 38.508-1 16.6.0 CR#1701 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

withdrawn [WTS] [JSN]
R5-210456 Update Annex I to TS 38.533 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1039 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210457 Update NR frequency band groups for FR1 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1040 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210458 Correction RLM config for event triggered test cases CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1041 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210459 Correction EN-DC FR1 timing tests CR

revised to R5-211722

ROHDE & SCHWARZ 38.533 16.6.0 CR#1042 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210460 Corrections to 5.4.1.1 CR

revised to R5-211723

ROHDE & SCHWARZ 38.533 16.6.0 CR#1043 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210461 Editorial rework of the conditions for CSI-FrequencyOccupation CR

revised to R5-211669

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#1702 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

revised [WTS] [JSN]
R5-210462 Align TDD UL DL Common for RRM with TS 38.533 CR

revised to R5-211670

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#1703 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

revised [WTS] [JSN]
R5-210463 Addition of Serving Cell Config for RRM timing test cases CR

revised to R5-211731

ROHDE & SCHWARZ 38.533 16.6.0 CR#1044 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

revised [WTS] [JSN]
R5-210464 Corrections NR SA FR1 timing test cases CR

revised to R5-211727

ROHDE & SCHWARZ 38.533 16.6.0 CR#1045 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210465 Editorial correction of title of clause 6 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1046 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210466 Corrections to 6.3.2.2.1 and 6.3.2.2.2 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1047 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210467 Corrections to 4.3.2.2.2 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1048 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210468 Add new SIB combination for RRM tests with single cell CR ROHDE & SCHWARZ 38.508-1 16.6.0 CR#1704 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

agreed [WTS] [JSN]
R5-210469 Changes to RRM default message contents CR

revised to R5-211665

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#1705 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

revised [WTS] [JSN]
R5-210470 Clarification on SSB Index to use in the PUxCH-PowerControl for RRM tests with more than one SSB CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1049 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210471 Clarification on SSB Index to use in the PUxCH-PowerControl for RRM tests with more than one SSB - EN-DC CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1050 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210472 Editorial: correct title of PRACH test cases to match RRM work plan - EN-DC FR1 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1051 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210473 Editorial: correct title of PRACH test cases to match RRM work plan - SA FR1 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1052 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210474 Editorial: correct title of PRACH test cases to match RRM work plan - SA FR2 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1053 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

agreed [WTS] [JSN]
R5-210475 Editorial: correct title of PRACH test cases to match RRM work plan - Annexes CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1054 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210476 Editorial: correct title of PRACH test cases to match RRM work plan - Applicability CR ROHDE & SCHWARZ 38.522 16.6.0 CR#53 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

withdrawn [WTS] [JSN]
R5-210477 Add SSB Index table for RRM with SECOND_SSB condition CR

revised to R5-211666

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#1706 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

revised [WTS] [JSN]
R5-210478 Align Annex A with TS 38.133 CR ROHDE & SCHWARZ 38.533 16.6.0 CR#1055 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

withdrawn [WTS] [JSN]
R5-210479 Correct reportOffsetList in CSI-ReportConfig CR

revised to R5-211671

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#1707 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

revised [WTS] [JSN]
R5-210480 Specify CSI-SSB-ResourceSet CR

revised to R5-211672

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#1708 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

revised [WTS] [JSN]
R5-210481 Correction of applicability definition for 2Rx related test cases to exclude category 1bis UEs equipped with single Rx antenna CR

revised to R5-211844

CAICT, Spreadtrum Communications 36.521-2 16.7.0 CR#948 catF TEI13_Test Rel-16 R5-90-e

AI: 5.5.1.3

revised [WTS] [JSN]
R5-210482 Addition of the Additional Information for some RF test cases in 9.6.1 CR CAICT 36.521-2 16.7.0 CR#949 catF TEI10_Test Rel-16 R5-90-e

AI: 5.5.1.3

agreed [WTS] [JSN]
R5-210483 Correction of core spec Ref. for 4 Rx antenna ports Capabilities CR CAICT 38.508-2 16.6.0 CR#148 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-210484 Addition of PUSCH HalfPi BPSK capability in FR2 CR CAICT 38.508-2 16.6.0 CR#149 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-210485 Correction of test purpose for 6.3.2 and 6.3D.2 CR CAICT 38.521-1 16.6.0 CR#1125 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-210486 Correction of test frequencies for NR band n28 30MHz test channel bandwidth of CA SUL and UL MIMO test cases in section 6 CR

revised to R5-211677

CAICT 38.521-1 16.6.0 CR#1126 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-210487 Editorial correction for error in Table 7.6.4.4.1-1 CR CAICT 38.521-1 16.6.0 CR#1127 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.2

agreed [WTS] [JSN]
R5-210488 Correction of test frequencies for NR band n28 30MHz test channel bandwidth of CA SUL and UL MIMO test cases in section 7 CR

revised to R5-211680

CAICT 38.521-1 16.6.0 CR#1128 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.2

revised [WTS] [JSN]
R5-210489 Correction of test purpose for 6.3.2 Transmit OFF power CR CAICT 38.521-2 16.6.0 CR#457 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-210490 Addition of new test case 6.3D.2 Transmit OFF power for UL MIMO CR CAICT 38.521-2 16.6.0 CR#458 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-210491 Correction of test applicability and test description for 7.4 Maximum input level CR CAICT 38.521-2 16.6.0 CR#459 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.2

agreed [WTS] [JSN]
R5-210492 Addition of new test cases for 7.4A Maximum input level for CA CR CAICT 38.521-2 16.6.0 CR#460 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.2

agreed [WTS] [JSN]
R5-210493 Addition of new test case 7.4D Maximum input level for UL MIMO CR CAICT 38.521-2 16.6.0 CR#461 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.2

withdrawn [WTS] [JSN]
R5-210494 Removal of brackets for MU of EIS spherical coverage CR CAICT 38.521-2 16.6.0 CR#462 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-210495 Correction of Annex P for Modified MPR behaviour CR CAICT 38.521-2 16.6.0 CR#463 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-210496 Correction of definition for EIS CR CAICT 38.521-2 16.6.0 CR#464 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-210497 Correction of test frequencies for NR band n28 30MHz test channel bandwidth of 6.2B.1.3 CR CAICT 38.521-3 16.6.0 CR#861 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210498 Addition of editor note to the incomplete test cases CR CAICT 38.521-3 16.6.0 CR#862 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210499 Correction of test applicability of 6.5B.5.3 CR CAICT 38.521-3 16.6.0 CR#863 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210500 Correction of test configuration tables in section 6 CR CAICT 38.521-3 16.6.0 CR#864 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210501 Completion of 7.6B.2.3_1.3 Inband blocking for EN-DC within FR1 5 CCs CR CAICT 38.521-3 16.6.0 CR#865 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-210502 Correction of test frequencies for NR band n28 30MHz test channel bandwidth of 7.6B.3.3 CR CAICT 38.521-3 16.6.0 CR#866 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-210503 Editorial correction for errors in 7.6B.4.3_1 CR

revised to R5-211713

CAICT 38.521-3 16.6.0 CR#867 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-210504 Correction of test configuration tables in section 7 CR

revised to R5-211714

CAICT 38.521-3 16.6.0 CR#868 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-210505 Correction of applicability definitions for PUSCH HalfPi BPSK related test cases CR

revised to R5-211720

CAICT 38.522 16.6.0 CR#54 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

revised [WTS] [JSN]
R5-210506 Correction of applicability definitions for long DRX cycle related test cases CR CAICT 38.522 16.6.0 CR#55 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

agreed [WTS] [JSN]
R5-210507 Correction of test applicability for long DRX cycle related test cases in section 4 CR CAICT 38.533 16.6.0 CR#1056 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210508 Correction of test applicability for long DRX cycle related test cases in section 5 CR CAICT 38.533 16.6.0 CR#1057 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

agreed [WTS] [JSN]
R5-210509 Correction of test applicability for long DRX cycle related test cases in section 6 CR CAICT 38.533 16.6.0 CR#1058 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210510 Correction of test applicability for long DRX cycle related test cases in section 7 CR CAICT 38.533 16.6.0 CR#1059 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

agreed [WTS] [JSN]
R5-210511 Correction of test applicability for long DRX cycle related test cases in section 8 CR CAICT 38.533 16.6.0 CR#1060 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.5

agreed [WTS] [JSN]
R5-210512 Introduction of test point analysis for SA FR2 7.4A Maximum input level for CA CR CAICT 38.905 16.6.0 CR#344 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-210513 Addition of applicability for new NAS Test case 9.1.9.2 CR Tech Mahindra Limited 38.523-2 16.6.0 CR#120 catF RACS-UEConTest Rel-16 R5-90-e

AI: 6.3.20.4

agreed [WTS] [JSN]
R5-210514 New WID on UE Conformance Test Aspects for 2-step RACH for NR WID new

revised to R5-211304

ZTE Corporation, China Telecom Rel-16 R5-90-e

AI: 4.1

revised [WTS] [JSN]
R5-210515 Discussion on test issue of ONOFF time mask for UL MIMO discussion Guangdong OPPO Mobile Telecom. 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210516 Adding Inter-band EN-DC combination within FR1 CR

revised to R5-211773

KDDI Corporation 38.521-3 16.6.0 CR#869 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

revised [WTS] [JSN]
R5-210517 Update to EN-DC Reference Sensitivity CR

revised to R5-211875

ROHDE & SCHWARZ 38.521-3 16.6.0 CR#870 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-210518 Clarification of DRB identity in CLOSE UE TEST LOOP message in 36.509 CR

revised to R5-211508

Anritsu 36.509 15.4.0 CR#208 catF TEI15_Test Rel-15 R5-90-e

AI: 6.5.2

revised [WTS] [JSN]
R5-210519 Clarification of DRB identity in CLOSE UE TEST LOOP message in 38.509 CR

revised to R5-211675

Anritsu 38.509 15.9.0 CR#33 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 5.3.2.3

revised [WTS] [JSN]
R5-210520 Correction to SR config for TDD PDSCH Type A performance test cases CR Anritsu 38.521-4 16.6.0 CR#275 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.2

agreed [WTS] [JSN]
R5-210521 Correction to test applicability for LTE-NR coexistence performance test cases CR Anritsu 38.521-4 16.6.0 CR#276 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

agreed [WTS] [JSN]
R5-210522 Correction to wideband CQI reporting under fading test cases CR Anritsu 38.521-4 16.6.0 CR#277 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.2

agreed [WTS] [JSN]
R5-210523 Addition of 8.3.2.2.1 2Rx TDD FR2 Single PMI with 2TX TypeI-SinglePanel Codebook CR Anritsu 38.521-4 16.6.0 CR#278 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.2

agreed [WTS] [JSN]
R5-210524 Correction to test time for Subband CQI test case CR Anritsu 38.521-4 16.6.0 CR#279 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

withdrawn [WTS] [JSN]
R5-210525 Correction to DCI bit size for PDSCH Type B performance and LTE coexistence tests CR

revised to R5-211716

Anritsu 38.521-4 16.6.0 CR#280 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

revised [WTS] [JSN]
R5-210526 Correction to LB setup DRB in CLOSE UE TEST LOOP message CR

revised to R5-211717

Anritsu 38.521-4 16.6.0 CR#281 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

revised [WTS] [JSN]
R5-210527 Clarification of SNR for 4RX UE in RLM Test Cases CR

revised to R5-211724

Anritsu 38.533 16.6.0 CR#1061 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210528 Correction to test procedure in test case 6.5.1.4 CR Anritsu 38.533 16.6.0 CR#1062 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210529 Correction to Interruptions during measurements on deactivated NR SCC test cases CR Anritsu 38.533 16.6.0 CR#1063 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210530 Correction to message configuration for NSA CSI-RS-based RLM RS test cases CR Anritsu 38.533 16.6.0 CR#1064 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210531 Correction to NR SA RLM out-of-sync test cases CR Anritsu 38.533 16.6.0 CR#1065 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210532 Correction to NR SA FR1 RRC Re-establishment test cases CR Anritsu 38.533 16.6.0 CR#1066 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210533 Correction to 4.5.1.2 and 6.5.1.2 PDCCH Aggregation Level CR Anritsu 38.533 16.6.0 CR#1067 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210534 Correction to NR SA FR1 E-UTRA RRC connection release with redirection CR Anritsu 38.533 16.6.0 CR#1068 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

withdrawn [WTS] [JSN]
R5-210535 Correction to FR1 NSA SS-SINR measurement test cases CR Anritsu 38.533 16.6.0 CR#1069 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210536 Correction to L1-RSRP test cases CR Anritsu 38.533 16.6.0 CR#1070 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210537 Correction to the procedure to add a step for establishing SRB2 and DRB CR Anritsu 38.533 16.6.0 CR#1071 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210538 Update of DRX configuration in FR1 Event-triggered Test cases CR Anritsu 38.533 16.6.0 CR#1072 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210539 Introduction 4CA Reference Sensitivity test 7.3A.3 CR WE Certification Oy, DISH Network 38.521-1 16.6.0 CR#1129 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

agreed [WTS] [JSN]
R5-210540 Introduction 4CA Maximum Input Level test 7.4A.3 CR WE Certification Oy, DISH Network 38.521-1 16.6.0 CR#1130 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

agreed [WTS] [JSN]
R5-210541 Introduction 4CA In-Band Blocking test 7.6A.2.3 CR WE Certification Oy, DISH Network 38.521-1 16.6.0 CR#1131 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

agreed [WTS] [JSN]
R5-210542 Corrections to MAC RACH Beam Failure test case CR Lenovo, Motorola Mobility, MCC TF160 38.523-1 16.6.0 CR#1986 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-210543 FR2 UL CA Frequency error test cases update CR

revised to R5-211684

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#465 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210544 Update of test point analysis for FR2 UL CA frequency error test cases CR

revised to R5-211736

Keysight Technologies UK Ltd 38.905 16.6.0 CR#345 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-210545 EN-DC FR2 UL CA Frequency error test cases update CR

revised to R5-211697

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#871 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-210546 Update of test point analysis for FR2 MPR, SEM and ACLR test cases CR

revised to R5-211893

Keysight Technologies UK Ltd, Ericsson, CAICT 38.905 16.6.0 CR#346 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-210547 FR2 MPR, ACLR and SEM test cases update as per TP analysis update CR

revised to R5-211863

Keysight Technologies UK Ltd, Ericsson, CAICT 38.521-2 16.6.0 CR#466 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210548 Default message exceptions for LTE carriers in EN-DC CR Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#872 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.3

agreed [WTS] [JSN]
R5-210549 Adding subPRB allocation to test case 6.2.3EC, Maximum Power Reduction (MPR) for UE category M2 CR Ericsson 36.521-1 16.7.0 CR#5253 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-210550 Core spec alignment, adding missing note in test case 8.11.1.2.3.1 CR Ericsson 36.521-1 16.7.0 CR#5254 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-210551 MCPTT Info Corrections CR

revised to R5-211520

UPV/EHU, Nemergent Solutions, MCC TF160 36.579-1 15.0.0 CR#119 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

revised [WTS] [JSN]
R5-210552 Adding subPRB allocation to 6.5.2.1EA.2, PUSCH-EVM with exclusion period for UE category M1 CR Ericsson 36.521-1 16.7.0 CR#5255 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-210553 Adding subPRB allocation to 6.5.2.2EA and 6.5.2.2EC CR Ericsson 36.521-1 16.7.0 CR#5256 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-210554 Adding references CR

revised to R5-211432

ROHDE & SCHWARZ 34.229-5 15.2.1 CR#95 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210555 New RAN5 PRD-19 on RAN5 WP Template other Samsung, Ericsson R5-90-e

AI: 4.3

withdrawn [WTS] [JSN]
R5-210556 Adding specs to References in TS 36.523-1 CR

revised to R5-211514

Samsung 36.523-1 16.7.0 CR#5005 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.3.11

revised [WTS] [JSN]
R5-210557 On the QoQZ standard deviation for ETC testing discussion

revised to R5-211944

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-210558 Adding subPRB allocation to 6.6.2.1EC, Spectrum Emission Mask for UE category M2 CR Ericsson 36.521-1 16.7.0 CR#5257 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-210559 Adding subPRB allocation to 6.6.2.3EC, Adjacent Channel Leakage power Ratio for UE category M2 CR Ericsson 36.521-1 16.7.0 CR#5258 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-210560 Adding subPRB allocation to 6.6.3EA.1, Transmitter Spurious emissions for UE category M1 CR Ericsson 36.521-1 16.7.0 CR#5259 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-210561 Correction to EN-DC test case 8.2.4.3.1.3 CR ANRITSU LTD 38.523-1 16.6.0 CR#1987 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.4

agreed [WTS] [JSN]
R5-210562 Adding band 7,42, 43 to Rx test cases for cat M2 CR Ericsson 36.521-1 16.7.0 CR#5260 catF LTE_bands_R16_M2_NB2-UEConTest Rel-16 R5-90-e

AI: 5.3.28.2

agreed [WTS] [JSN]
R5-210563 New note added for band n71 CR Ericsson 38.508-1 16.6.0 CR#1709 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

withdrawn [WTS] [JSN]
R5-210564 Introduction of applicability for SRVCC from NG-RAN to 3GPP UTRAN CR

revised to R5-211496

CATT, TDIA, Huawei, Hisilicon 38.523-2 16.6.0 CR#121 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.4

revised [WTS] [JSN]
R5-210565 Update of waveform to be used during Rx peam peak search in Annex K.1.2 CR Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#467 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-210566 Update on manufacturer declaration required for Receiver Beam Peak Search CR Keysight Technologies UK Ltd 38.508-2 16.6.0 CR#150 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-210567 Corrections to DL SPS test case CR Lenovo, Motorola Mobility, MCC TF160 38.523-1 16.6.0 CR#1988 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-210568 Corrections to UL configured grant type 1 test case CR Lenovo, Motorola Mobility, MCC TF160 38.523-1 16.6.0 CR#1989 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-210569 Corrections to UL configured grant type 2 test case CR Lenovo, Motorola Mobility, MCC TF160 38.523-1 16.6.0 CR#1990 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-210570 Update test case applicability for 6.2.3.9 CR MediaTek (Chengdu) Inc. 38.508-2 16.6.0 CR#151 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.2

withdrawn [WTS] [JSN]
R5-210571 Correction to 11.4.8 CR MediaTek Inc. 38.523-1 16.6.0 CR#1991 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.4

agreed [WTS] [JSN]
R5-210572 Removing test case 9.1.5.2.9 CR

revised to R5-211333

MediaTek Inc. 38.523-1 16.6.0 CR#1992 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.3

revised [WTS] [JSN]
R5-210573 Correction to Tracking area updating / Inter-system change from S1 mode to N1 mode in 5GMM/EMM-IDLE CR MediaTek Inc. 38.508-1 16.6.0 CR#1710 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

withdrawn [WTS] [JSN]
R5-210574 Correction to test case 6.1.1.3 CR

revised to R5-211329

MediaTek Inc. 38.523-1 16.6.0 CR#1993 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

revised [WTS] [JSN]
R5-210575 Correction to NR5G MAC TC 7.1.1.1.3 CR Qualcomm CDMA Technologies, Keysight Technologies UK Ltd., MCC TF160 38.523-1 16.6.0 CR#1994 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-210576 Correction to test case 6.1.2.8 CR

revised to R5-211330

MediaTek Inc. 38.523-1 16.6.0 CR#1995 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

revised [WTS] [JSN]
R5-210577 Correction to test case 6.4.1.2 CR

revised to R5-211331

MediaTek Inc. 38.523-1 16.6.0 CR#1996 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

revised [WTS] [JSN]
R5-210578 Update test case applicability for 6.2.3.9 CR

revised to R5-211315

MediaTek Inc. 38.523-2 16.6.0 CR#122 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

revised [WTS] [JSN]
R5-210579 Add capability for I-RAT cell counting CR MediaTek Inc. 38.508-2 16.6.0 CR#152 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.2

withdrawn [WTS] [JSN]
R5-210580 Discussion paper to remove test case 9.1.5.2.9 from TS 38.523-1 discussion MediaTek Inc. 5GS_NR_LTE-UEConTest R5-90-e

AI: 6.3.2.

noted [WTS] [JSN]
R5-210581 Discussion to add test cases for RRC DL segmentation discussion

revised to R5-211310

MediaTek Inc. Rel-16 R5-90-e

AI: 6.4.7

revised [WTS] [JSN]
R5-210582 Addition of A.15.1 MTSI MO Video Call / with preconditions / 5GS CR

revised to R5-211433

Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#96 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210583 WI Update for UE Conformance Test Aspects - Rel -16 for CLI handling for NR WID revised Qualcomm Technologies Netherlands B.V. 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 7.4.2

agreed [WTS] [JSN]
R5-210584 SR UE Conformance Test Aspects - Rel -16 for CLI handling for NR WI status report Qualcomm Technologies Netherlands B.V. 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210585 SR on 5G NR User Equipment (UE) Application Layer Data Throughput Performance WI status report Qualcomm Technologies Netherlands B.V. 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210586 SI update on 5G NR User Equipment (UE) Application Layer Data Throughput Performance SID revised Qualcomm Technologies Netherlands B.V. 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 7.4.2

agreed [WTS] [JSN]
R5-210587 SR - UE Conformance Test Aspects - Enhancements for Mission Critical Services MCPTT, MCData and MCVideo (UID - 890042) MCenhUEConTest WI status report NIST MCenhUEConTest Rel-15 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210588 WP - UE Conformance Test Aspects - Enhancements for Mission Critical Services MCPTT, MCData and MCVideo (UID - 890042) MCenhUEConTest Work Plan NIST MCenhUEConTest Rel-15 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210589 Correction to Annex A.9 EPS Fallback for Voice Call / 5GS CR Qualcomm CDMA Technologies, Anritsu 34.229-5 15.2.1 CR#97 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

withdrawn [WTS] [JSN]
R5-210590 Correction to IMS over 5GS TC 6.2 CR Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#98 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

withdrawn [WTS] [JSN]
R5-210591 Correction to IMS over 5GS TC 7.2 CR

revised to R5-211434

Qualcomm CDMA Technologies, Anritsu, MCC TF160 34.229-5 15.2.1 CR#99 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210592 Correction to IMS over 5GS TC 7.11 CR

revised to R5-211435

Qualcomm CDMA Technologies, Keysight Technologies, Anritsu 34.229-5 15.2.1 CR#100 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210593 Updates to 37.901-5 Annex A for Downlink Throughput tests with Fading and FRC scenario CR QUALCOMM communications-France 37.901-5 16.2.0 CR#8 catF FS_UE_5GNR_App_Data_Perf Rel-16 R5-90-e

AI: 5.3.9.1

agreed [WTS] [JSN]
R5-210594 Updates to connection diagram for Application Layer Data Throughput CR QUALCOMM communications-France 37.901-5 16.2.0 CR#9 catF FS_UE_5GNR_App_Data_Perf Rel-16 R5-90-e

AI: 5.3.9.1

agreed [WTS] [JSN]
R5-210595 Updates to Impact of Modem Performance in Application Layer Throughput CR

revised to R5-211782

QUALCOMM communications-France 37.901-5 16.2.0 CR#10 catF FS_UE_5GNR_App_Data_Perf Rel-16 R5-90-e

AI: 5.3.9.1

revised [WTS] [JSN]
R5-210596 Updates to Test System Uncertainty and Test Tolerance for Application Layer Data Throughput CR QUALCOMM communications-France 37.901-5 16.2.0 CR#11 catF FS_UE_5GNR_App_Data_Perf Rel-16 R5-90-e

AI: 5.3.9.1

withdrawn [WTS] [JSN]
R5-210597 Updates to Conclusion for Application Layer Data Throughput CR QUALCOMM communications-France 37.901-5 16.2.0 CR#12 catF FS_UE_5GNR_App_Data_Perf Rel-16 R5-90-e

AI: 5.3.9.1

agreed [WTS] [JSN]
R5-210598 Correction to Additional Information of 8.2.1.3.1_A and 8.7.1.1_A in Table 4.1-1 CR TTA 36.521-2 16.7.0 CR#950 catF TEI11_Test Rel-16 R5-90-e

AI: 5.5.1.3

agreed [WTS] [JSN]
R5-210599 Editorial correction on numbering of several Tables in 38.508-1 CR TTA 38.508-1 16.6.0 CR#1711 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

agreed [WTS] [JSN]
R5-210600 On MTSU definition for RRM discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210601 Clarification of BWP1 and BWP2 in 6.6.1.3, 6.6.1.4, 6.6.1.6 CR Keysight Technologies UK Ltd 38.533 16.6.0 CR#1073 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210602 Addition of R16 new channel bandwidths for n3 in 38.521-1 CR

revised to R5-211789

China Telecommunications 38.521-1 16.6.0 CR#1132 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.3

revised [WTS] [JSN]
R5-210603 Update on DL AWGN absolute power uncertainty values for DFF CR Keysight Technologies UK Ltd 38.903 16.6.0 CR#200 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

withdrawn [WTS] [JSN]
R5-210604 Update MU threshold for DL AWGN absolute power for RRM FR2 CR

revised to R5-211607

Keysight Technologies UK Ltd 38.903 16.6.0 CR#201 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210605 RACH-Config Correction for Non-Contention based Random Access test case 6.3.2.2.2 CR Keysight Technologies UK Ltd 38.533 16.6.0 CR#1074 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

withdrawn [WTS] [JSN]
R5-210606 RACH-Config Correction for Non-Contention based Random Access test case 4.3.2.2.2 CR Keysight Technologies UK Ltd 38.533 16.6.0 CR#1075 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

withdrawn [WTS] [JSN]
R5-210607 Correction in 4.7.3.2.1 test parameters CR

revised to R5-211725

Keysight Technologies UK Ltd 38.533 16.6.0 CR#1076 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210608 Correction in 4.5.2.1 and 4.5.2.2 test procedure CR Keysight Technologies UK Ltd 38.533 16.6.0 CR#1077 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210609 Correction to PLMN Selection Test Case 6.2.1.2 CR Apple (UK) Limited 38.523-1 16.6.0 CR#1997 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

withdrawn [WTS] [JSN]
R5-210610 Correction to Inter-RAT Cell Reselection Test Case 6.4.3.1 CR Apple (UK) Limited 38.523-1 16.6.0 CR#1998 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-210611 Update IE PDCCH-ConfigCommon CR

revised to R5-211374

Ericsson, MCC TF160, Anritsu 38.508-1 16.6.0 CR#1712 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

revised [WTS] [JSN]
R5-210612 Editorial correction in 6.5.2.1 CR Keysight Technologies UK Ltd 38.533 16.6.0 CR#1078 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

withdrawn [WTS] [JSN]
R5-210613 Correction in SIB5 for iRAT cell reselection CR Keysight Technologies UK Ltd 38.533 16.6.0 CR#1079 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210614 Correction in 6.1.2.2 test procedure CR Keysight Technologies UK Ltd 38.533 16.6.0 CR#1080 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210615 Correction in Table H.3.6-5 CR Keysight Technologies UK Ltd 38.533 16.6.0 CR#1081 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

withdrawn [WTS] [JSN]
R5-210616 Editorial update DLDedicatedMessageSegment message CR Ericsson 38.508-1 16.6.0 CR#1713 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-210617 AP#87e.24 Input for Large Device Size discussion Apple Portugal 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210618 CR for 38.521-3: Update Editors Notes in Power Control tests CR Apple Portugal 38.521-3 16.6.0 CR#873 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

withdrawn [WTS] [JSN]
R5-210619 Correction to NR-DC RRC test case 8.2.3.14.2 CR TDIA, CATT 38.523-1 16.6.0 CR#1999 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

withdrawn [WTS] [JSN]
R5-210620 Correction to NR-DC RRC test case 8.2.3.14.2 CR

revised to R5-211397

TDIA, CATT 38.523-1 16.6.0 CR#2000 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

revised [WTS] [JSN]
R5-210621 Correction of NR-DC tese case 8.2.5.1.2 CR TDIA, CATT 38.523-1 16.6.0 CR#2001 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.5

withdrawn [WTS] [JSN]
R5-210622 Introduciton of general capability for NR to UTRA-FDD CELL_DCH CS handover CR

revised to R5-211492

CATT, TDIA 38.508-2 16.6.0 CR#153 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.2

revised [WTS] [JSN]
R5-210623 Correction to Table 4.6.1-13 RRCReconfiguration CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1714 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

agreed [WTS] [JSN]
R5-210624 Correction to Table 4.6.3-185 SSB-MTC CR

revised to R5-211375

Huawei, Hisilicon, Ericsson 38.508-1 16.6.0 CR#1715 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

revised [WTS] [JSN]
R5-210625 Correction to Table 4.6.3-192 TDD-UL-DL-ConfigCommon CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1716 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

withdrawn [WTS] [JSN]
R5-210626 Correction to Table 6.4.1-11 USIM Configuration 11 CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1717 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.4

agreed [WTS] [JSN]
R5-210627 Correction to Table 4.8.2.1-7 Reference QoS rule 7 CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1718 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.5

agreed [WTS] [JSN]
R5-210628 Correction to NR TC 6.1.1.6-PLMN Selection with MinimumPeriodicSearchTimer CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2002 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-210629 Correction to NR TC 6.1.2.2-Cell Selection Qqualmin CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2003 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

withdrawn [WTS] [JSN]
R5-210630 Correction to NR TC 6.1.2.9-Cell Reselection CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2004 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-210631 Correction to NR TC 6.2.3.2-L2N cell reselection CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2005 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-210632 Correction to NR TC 6.2.3.4-N2L cell reselection CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2006 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-210633 Correction to NR TC 6.3.1.1-SoR security check successful CR

revised to R5-211379

Huawei, Hisilicon 38.523-1 16.6.0 CR#2007 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

revised [WTS] [JSN]
R5-210634 Correction to NR TC 6.3.1.2-SoR ACK has NOT requested CR

revised to R5-211380

Huawei, Hisilicon 38.523-1 16.6.0 CR#2008 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

revised [WTS] [JSN]
R5-210635 Correction to NR TC 6.3.1.3-SoR Security check unsuccessful CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2009 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

withdrawn [WTS] [JSN]
R5-210636 Correction to NR TC 6.3.1.5-SoR UE configured but not receive Steering of Roaming from Network CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2010 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

withdrawn [WTS] [JSN]
R5-210637 Correction to NR TC 6.3.1.8-Automatic PLMN selection mode CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2011 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

withdrawn [WTS] [JSN]
R5-210638 Correction to NR TC 7.1.1.2.2-PDSCH Aggregate CR

revised to R5-211384

Huawei, Hisilicon, MCC TF160 38.523-1 16.6.0 CR#2012 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

revised [WTS] [JSN]
R5-210639 Correction to NR TC 7.1.1.3.8.X-PHR report CR

revised to R5-211385

Huawei, Hisilicon 38.523-1 16.6.0 CR#2013 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

revised [WTS] [JSN]
R5-210640 Correction to NR TC 7.1.2.3.3 and 7.1.2.3.4-RLC SN sequence CR

revised to R5-211386

Huawei, Hisilicon, Qualcomm CDMA Technologies, MCC TF160 38.523-1 16.6.0 CR#2014 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.3

revised [WTS] [JSN]
R5-210641 Correction to NR TC 7.1.3.1.1 and 7.1.3.1.2-PDCP SN sequence CR

revised to R5-211387

Huawei, Hisilicon, Qualcomm CDMA Technologies, MCC TF160 38.523-1 16.6.0 CR#2015 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.4

revised [WTS] [JSN]
R5-210642 Correction to NR test case 8.1.3.1.13-CSI-RS based intra-freq measure CR

revised to R5-211390

Huawei, Hisilicon 38.523-1 16.6.0 CR#2016 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.3

revised [WTS] [JSN]
R5-210643 Correction to NR TC 8.1.3.1.15A-bliacklisting CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2017 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.3

agreed [WTS] [JSN]
R5-210644 Correction to NR TC 8.1.3.2.2-Event B2 CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2018 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.3

agreed [WTS] [JSN]
R5-210645 Correction to NR TC 8.1.5.6.1-RLF CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2019 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

agreed [WTS] [JSN]
R5-210646 Correction to NR TC 8.1.5.8.1-Latency check CR

revised to R5-211392

Huawei, Hisilicon, MCC TF160, Qualcomm 38.523-1 16.6.0 CR#2020 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

revised [WTS] [JSN]
R5-210647 Addition of NR TC 8.1.5.8.2.1-intra-band SCell Latency check CR

revised to R5-211393

Huawei, Hisilicon, MCC TF160 38.523-1 16.6.0 CR#2021 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

revised [WTS] [JSN]
R5-210648 Addition of NR TC 8.1.5.8.2.2-inter-band SCell Latency check CR Huawei, Hisilicon, MCC TF160 38.523-1 16.6.0 CR#2022 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

agreed [WTS] [JSN]
R5-210649 Addition of NR TC 8.1.5.8.2.3-intra-band non-contigous SCell Latency check CR Huawei, Hisilicon, MCC TF160 38.523-1 16.6.0 CR#2023 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

agreed [WTS] [JSN]
R5-210650 Correction to NR-DC TC 8.2.2.7.2-bearer type change without security key change CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2024 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.2

agreed [WTS] [JSN]
R5-210651 Correction to NR-DC TC 8.2.2.9.2-Split DRB CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2025 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.2

agreed [WTS] [JSN]
R5-210652 Correction to NR-DC TC 8.2.3.16.2-Intra NR measurements CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2026 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

agreed [WTS] [JSN]
R5-210653 Correction to NR-DC TC 8.2.6.1.2.1-RLC failure CR

revised to R5-211401

Huawei, Hisilicon 38.523-1 16.6.0 CR#2027 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.6

revised [WTS] [JSN]
R5-210654 Correction to NR TC 11.1.3-EPS Fallback with handover CR

revised to R5-211406

Huawei, Hisilicon 38.523-1 16.6.0 CR#2028 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.1

revised [WTS] [JSN]
R5-210655 Correction to NR TC applicability for 5GS CR

revised to R5-211416

Huawei, Hisilicon 38.523-2 16.6.0 CR#123 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

revised [WTS] [JSN]
R5-210656 Correction to NR IMS TC 6.5-UE de-reg after ISIM refresh CR Huawei, Hisilicon 34.229-5 15.2.1 CR#101 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

withdrawn [WTS] [JSN]
R5-210657 Correction to NR IMS TC 7.10-Content Type not present CR

revised to R5-211436

Huawei, Hisilicon 34.229-5 15.2.1 CR#102 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210658 Correction to NR IMS A.9.2-Optional UPDATE after EPS fallback CR

revised to R5-211437

Huawei, Hisilicon 34.229-5 15.2.1 CR#103 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210659 Withdrawing NR IMS TC 7.3-MO voice-UE preconditions enabled but not included in INVITE CR Huawei, Hisilicon 34.229-5 15.2.1 CR#104 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-210660 Correction to NR IMS TC 10.1-Conformance requirement update CR

revised to R5-211438

Huawei, Hisilicon 34.229-5 15.2.1 CR#105 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210661 Addition of NR IMS TC 7.26-MO CAT forking model CR

revised to R5-211439

Huawei, Hisilicon 34.229-5 15.2.1 CR#106 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210662 Addition of NR IMS TC 8.26-MO hold without announcement CR

revised to R5-211440

Huawei, Hisilicon 34.229-5 15.2.1 CR#107 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210663 Addition of NR IMS TC 8.28-MT hold without announcement CR

revised to R5-211441

Huawei, Hisilicon 34.229-5 15.2.1 CR#108 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210664 Addition of NR IMS TC 8.30-Subscription to MWI event CR

revised to R5-211442

Huawei, Hisilicon 34.229-5 15.2.1 CR#109 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210665 Addition of NR IMS TC 8.31-Creating and leaving conference CR

revised to R5-211443

Huawei, Hisilicon 34.229-5 15.2.1 CR#110 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210666 Addition of NR IMS TC 8.32-Inviting user to conference by REFER CR

revised to R5-211444

Huawei, Hisilicon 34.229-5 15.2.1 CR#111 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210667 Addition of NR IMS TC 8.34-Three way session CR

revised to R5-211445

Huawei, Hisilicon 34.229-5 15.2.1 CR#112 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210668 Addition of NR IMS TC 8.36-MO explicit communication transfer CR

revised to R5-211446

Huawei, Hisilicon 34.229-5 15.2.1 CR#113 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-210669 Addition of TC 7.1.1.3.1-UL grant prioritization CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2029 catF NR_IioT-UEConTest Rel-16 R5-90-e

AI: 6.3.14.3

withdrawn [WTS] [JSN]
R5-210670 Correction to NR TC applicability for IIoT CR

revised to R5-211455

Huawei, Hisilicon 38.523-2 16.6.0 CR#124 catF NR_IioT-UEConTest Rel-16 R5-90-e

AI: 6.3.14.4

revised [WTS] [JSN]
R5-210671 Addition of MDT TC 8.1.6.1.4.3-CEF-intra-NR handover CR

revised to R5-211479

Huawei, Hisilicon 38.523-1 16.6.0 CR#2030 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210672 Addition of MDT TC 8.1.6.1.4.4-CEF-RRC re-establishment CR

revised to R5-211480

Huawei, Hisilicon 38.523-1 16.6.0 CR#2031 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210673 Addition of MDT TC 8.1.6.1.4.5-CEF-location info CR

revised to R5-211481

Huawei, Hisilicon 38.523-1 16.6.0 CR#2032 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210674 Addition of MDT TC 8.1.6.1.4.6-CEF-intra-freq measurements CR

revised to R5-211482

Huawei, Hisilicon 38.523-1 16.6.0 CR#2033 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210675 Addition of MDT TC 8.1.6.1.4.7-CEF-inter-freq measurements CR

revised to R5-211483

Huawei, Hisilicon 38.523-1 16.6.0 CR#2034 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210676 Addition of MDT TC 8.1.6.1.4.8-CEF-rach failure CR

revised to R5-211484

Huawei, Hisilicon 38.523-1 16.6.0 CR#2035 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210677 Correction to NR TC applicability for MDT CR

revised to R5-211489

Huawei, Hisilicon 38.523-2 16.6.0 CR#125 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.4

revised [WTS] [JSN]
R5-210678 Addition of 5G SRVCC TC 8.1.3.2.6-NR to UMTS Inter-RAT measurements-Event B1 CR

revised to R5-211494

Huawei, Hisilicon 38.523-1 16.6.0 CR#2036 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.3

revised [WTS] [JSN]
R5-210679 Addition of 5G SRVCC TC 8.1.3.2.7-NR to UMTS Inter-RAT measurements-Event B2 CR

revised to R5-211495

Huawei, Hisilicon 38.523-1 16.6.0 CR#2037 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.3

revised [WTS] [JSN]
R5-210680 Correction to NR TC applicability for 5G SRVCC CR Huawei, Hisilicon 38.523-2 16.6.0 CR#126 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.4

withdrawn [WTS] [JSN]
R5-210681 Correction to LTE TC 6.1.1.2a CR Huawei, Hisilicon, MCC TF160 36.523-1 16.7.0 CR#5006 catF TEI8_Test Rel-16 R5-90-e

AI: 6.5.3.1

agreed [WTS] [JSN]
R5-210682 Correction to LTE TC 6.1.1.6a CR

revised to R5-211342

Huawei, Hisilicon, MCC TF160 36.523-1 16.7.0 CR#5007 catF TEI8_Test Rel-16 R5-90-e

AI: 6.5.3.1

revised [WTS] [JSN]
R5-210683 Addition of LTE TC 6.1.1.6b CR Huawei, Hisilicon, MCC TF160 36.523-1 16.7.0 CR#5008 catF TEI8_Test Rel-16 R5-90-e

AI: 6.5.3.1

agreed [WTS] [JSN]
R5-210684 Correction to LTE TC 6.1.2.3 CR Huawei, Hisilicon, MCC TF160 36.523-1 16.7.0 CR#5009 catF TEI8_Test Rel-16 R5-90-e

AI: 6.5.3.1

agreed [WTS] [JSN]
R5-210685 Correction to LTE TC 6.1.2.12 CR Huawei, Hisilicon, MCC TF160 36.523-1 16.7.0 CR#5010 catF TEI8_Test Rel-16 R5-90-e

AI: 6.5.3.1

agreed [WTS] [JSN]
R5-210686 Addition of LTE TC applicability CR

revised to R5-211515

Huawei, Hisilicon, MCC TF160 36.523-2 16.7.0 CR#1336 catF TEI8_Test Rel-16 R5-90-e

AI: 6.5.4

revised [WTS] [JSN]
R5-210687 Correction to Table 4.6.3-25B CondReconfigId CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1719 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.1

agreed [WTS] [JSN]
R5-210688 Correction to Table 4.6.3-25C CondReconfigToAddModList CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1720 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.1

agreed [WTS] [JSN]
R5-210689 Correction to Table 4.6.3-25D ConditionalReconfiguration CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1721 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.1

agreed [WTS] [JSN]
R5-210690 Correction to Table 4.6.3-142 ReportConfigNR CR

revised to R5-211456

Huawei, Hisilicon 38.508-1 16.6.0 CR#1722 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.1

revised [WTS] [JSN]
R5-210691 Addition of NR TC 8.1.4.4.1-Conditional handover Success CR

revised to R5-211458

Huawei, Hisilicon 38.523-1 16.6.0 CR#2038 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.3

revised [WTS] [JSN]
R5-210692 Addition of NR TC 8.1.4.4.2 -Conditional handover modify conditional handover configuration CR

revised to R5-211459

Huawei, Hisilicon 38.523-1 16.6.0 CR#2039 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.3

revised [WTS] [JSN]
R5-210693 Addition of NR TC 8.1.4.4.3-Conditional handover Failure CR

revised to R5-211460

Huawei, Hisilicon 38.523-1 16.6.0 CR#2040 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.3

revised [WTS] [JSN]
R5-210694 Correction to applicability for NR MobEnc CR

revised to R5-211461

Huawei, Hisilicon 38.523-2 16.6.0 CR#127 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.4

revised [WTS] [JSN]
R5-210695 Add UE capability for NR MobEnc CR

revised to R5-211457

Huawei, Hisilicon 38.508-2 16.6.0 CR#154 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.2

revised [WTS] [JSN]
R5-210696 SR UE Conformance Test Aspects - Rel-16 NR Mobility Enhancement WI status report Huawei, Hisilicon NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210697 WP UE Conformance Test Aspects - Rel-16 NR Mobility Enhancement Work Plan Huawei, Hisilicon NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210698 Addition of IE SL-PreconfigurationNR CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1723 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210699 Addition of V2X NAS IEs CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1724 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210700 Addition of SI combination for NR SL CR

revised to R5-211462

Huawei, Hisilicon 38.508-1 16.6.0 CR#1725 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

revised [WTS] [JSN]
R5-210701 Correction of NR SL IE SL-BWP-ConfigCommon CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1726 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210702 Correction of NR SL IE SL-BWP-PoolConfigCommon CR

revised to R5-211335

Huawei, Hisilicon 38.508-1 16.6.0 CR#1727 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

revised [WTS] [JSN]
R5-210703 Correction of NR SL IE SL-ConfigDedicatedNR CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1728 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210704 Correction of NR SL IE SL-FreqConfigCommon CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1729 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210705 Correction of NR SL IE SL-LogicalChannelConfig CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1730 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210706 Correction of NR SL IE SL-MeasConfigInfo CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1731 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210707 Correction of NR SL IE SL-PDCP-Config CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1732 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210708 Correction of NR SL IE SL-RadioBearerConfig CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1733 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210709 Correction of NR SL IE SL-ResourcePool CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1734 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210710 Correction of NR SL IE SL-RLC-BearerConfig CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1735 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210711 Correction of NR SL IE SL-RLC-Config CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1736 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210712 Correction of NR SL IE SL-SDAP-Config CR

revised to R5-211336

Huawei, Hisilicon 38.508-1 16.6.0 CR#1737 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

revised [WTS] [JSN]
R5-210713 Correction to NR Uu IE ARFCN-ValueNR CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1738 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210714 Correction to NR Uu IE SCS-SpecificCarrier CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1739 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-210715 Correction to PC5-RRC message RRCReconfigurationSidelink CR

revised to R5-211337

Huawei, Hisilicon 38.508-1 16.6.0 CR#1740 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

revised [WTS] [JSN]
R5-210716 Correction to PC5-RRC message UECapabilityEnquirySidelink CR

revised to R5-211338

Huawei, Hisilicon 38.508-1 16.6.0 CR#1741 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

revised [WTS] [JSN]
R5-210717 Correction to PC5-RRC message UECapabilityInformationSidelink CR

revised to R5-211339

Huawei, Hisilicon 38.508-1 16.6.0 CR#1742 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

revised [WTS] [JSN]
R5-210718 SR UE Conformance Test Aspects - Rel-16 NR V2X WI status report Huawei, Hisilicon 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210719 WP UE Conformance Test Aspects - Rel-16 NR V2X Work Plan Huawei, Hisilicon 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210720 SR UE Conformance Test Aspects- SRVCC_NR_to_UMTS WI status report China Unicom SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210721 WP UE Conformance Test Aspects- SRVCC_NR_to_UMTS Work Plan China Unicom SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210722 Discussion on omitting of Rx cases with UL-MIMO on TDD bands discussion Huawei, HiSilicon 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210723 Omitting of FR1 Rx cases with UL-MIMO on TDD bands CR Huawei, HiSilicon 38.521-1 16.6.0 CR#1133 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-210724 Omitting of FR2 Rx cases with UL-MIMO on TDD bands CR Huawei, HiSilicon 38.521-2 16.6.0 CR#468 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-210725 Omitting of NSA Rx cases with UL-MIMO on TDD bands CR Huawei, HiSilicon 38.521-3 16.6.0 CR#874 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210726 Updating applicability of FR1 Rx cases with UL-MIMO to only FDD bands CR Huawei, HiSilicon 38.522 16.6.0 CR#56 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

withdrawn [WTS] [JSN]
R5-210727 Addition of Inner_partial allocation in general section and a few test cases CR

revised to R5-211685

Huawei, HiSilicon, Keysight 38.521-2 16.6.0 CR#469 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210728 Correction of parameter configuration for open loop power control CR

revised to R5-211686

Huawei, HiSilicon 38.521-2 16.6.0 CR#470 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210729 Removing test condition of extreme voltage CR Huawei, HiSilicon 38.521-2 16.6.0 CR#471 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-210730 Cleaning up of FR2 test specification CR

revised to R5-211864

Huawei, HiSilicon 38.521-2 16.6.0 CR#472 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210731 Adding definition of FR2a, FR2b and FR2c in general section CR Huawei, HiSilicon 38.521-2 16.6.0 CR#473 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-210732 Cleaning up of Annex K CR Huawei, HiSilicon 38.521-2 16.6.0 CR#474 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-210733 Discussion on FR2 TT calculation in special scenarios discussion Huawei, HiSilicon, Vivo 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210734 Discussion on draft LS on on nominal channel spacing calculation discussion Huawei, HiSilicon 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210735 Editorial correction to several MU factors CR

revised to R5-211732

Huawei, HiSilicon 38.903 16.6.0 CR#202 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210736 Correcting EN-DC A-MPR test requirements for non-overlapping test points CR

revised to R5-211871

Huawei, HiSilicon 38.521-3 16.6.0 CR#875 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-210737 Correction of test requirements for EN-DC configured output power CR

revised to R5-211698

Huawei, HiSilicon, Anritsu 38.521-3 16.6.0 CR#876 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-210738 Clarification of tested Rx antenna numbers on E-UTRA band CR

revised to R5-211715

Huawei, HiSilicon, Bureau Veritas 38.521-3 16.6.0 CR#877 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-210739 Correction of test points for NS_48 CR

revised to R5-211786

Huawei, HiSilicon 38.521-1 16.6.0 CR#1134 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

revised [WTS] [JSN]
R5-210740 Updating TP analysis of FR1 A-MPR for NS_48 CR Huawei, HiSilicon 38.905 16.6.0 CR#347 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.9

agreed [WTS] [JSN]
R5-210741 Addition of A-MPR test for NS_49 CR

revised to R5-211787

Huawei, HiSilicon 38.521-1 16.6.0 CR#1135 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

revised [WTS] [JSN]
R5-210742 Adding TP analysis of FR1 A-MPR for NS_49 CR Huawei, HiSilicon 38.905 16.6.0 CR#348 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.9

agreed [WTS] [JSN]
R5-210743 Resubmitting TP analysis of FR1 A-MPR for NS_44 CR Huawei, HiSilicon 38.905 16.6.0 CR#349 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.9

agreed [WTS] [JSN]
R5-210744 Adding PICS for UL switching CR

revised to R5-211910

Huawei, HiSilicon 38.508-2 16.6.0 CR#155 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.2

revised [WTS] [JSN]
R5-210745 Adding test applicability for switching test case CR

revised to R5-211913

Huawei, HiSilicon 38.522 16.6.0 CR#57 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.5

revised [WTS] [JSN]
R5-210746 Updating Rel-16 EN-DC PC2 MOP to include powerClassNRPart-r16 CR

revised to R5-211840

Huawei, HiSilicon 38.521-3 16.6.0 CR#878 catF TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

revised [WTS] [JSN]
R5-210747 Updating Rel-16 EN-DC PC2 MPR to include powerClassNRPart-r16 CR

revised to R5-211841

Huawei, HiSilicon 38.521-3 16.6.0 CR#879 catF TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

revised [WTS] [JSN]
R5-210748 Updating Rel-16 EN-DC PC2 A-MPR to include powerClassNRPart-r16 CR

revised to R5-211842

Huawei, HiSilicon 38.521-3 16.6.0 CR#880 catF TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

revised [WTS] [JSN]
R5-210749 Updating Rel-16 EN-DC PC2 configured output power to include powerClassNRPart-r16 CR

revised to R5-211843

Huawei, HiSilicon 38.521-3 16.6.0 CR#881 catF TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

revised [WTS] [JSN]
R5-210750 TEI16 Status update of introduction of PowerClassNRPart capability discussion Huawei, HiSilicon TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

noted [WTS] [JSN]
R5-210751 Addition of TDD NB-IOT RSTD measurement test case 9.7.1 CR

revised to R5-211796

Huawei, HiSilicon 37.571-1 16.7.0 CR#312 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

revised [WTS] [JSN]
R5-210752 Addition of TDD NB-IOT RSTD measurement test case 9.7.2 CR

revised to R5-211797

Huawei, HiSilicon 37.571-1 16.7.0 CR#313 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

revised [WTS] [JSN]
R5-210753 Addition of TDD NB-IOT RSTD measurement test case 9.7.3 CR

revised to R5-211798

Huawei, HiSilicon 37.571-1 16.7.0 CR#314 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

revised [WTS] [JSN]
R5-210754 Addition of TDD NB-IOT RSTD measurement test case 9.8.1 CR

revised to R5-211799

Huawei, HiSilicon 37.571-1 16.7.0 CR#315 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

revised [WTS] [JSN]
R5-210755 Addition of TDD NB-IOT RSTD measurement test case 9.8.2 CR

revised to R5-211800

Huawei, HiSilicon 37.571-1 16.7.0 CR#316 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

revised [WTS] [JSN]
R5-210756 Addition of TDD NB-IOT RSTD measurement test case 9.8.3 CR

revised to R5-211801

Huawei, HiSilicon 37.571-1 16.7.0 CR#317 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

revised [WTS] [JSN]
R5-210757 Update to Annex C for TDD NB-IOT RSTD measurement test cases CR Huawei, HiSilicon 37.571-1 16.7.0 CR#318 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-210758 Addition of applicability for TDD NB-IOT RSTD measurement test cases CR

revised to R5-211802

Huawei, HiSilicon 37.571-3 16.6.0 CR#133 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.6

revised [WTS] [JSN]
R5-210759 WP - Shortened TTI and processing time for LTE Work Plan Huawei, HiSilicon LTE_sTTIandPT-UEConTest Rel-15 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210760 SR - Shortened TTI and processing time for LTE WI status report Huawei, HiSilicon LTE_sTTIandPT-UEConTest Rel-15 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210761 WP - RF requirements for NR frequency range 1 (FR1) Work Plan Huawei, HiSilicon NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210762 SR - RF requirements for NR frequency range 1 (FR1) WI status report Huawei, HiSilicon NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210763 WP - Enhancements on MIMO for NR Work Plan Huawei, HiSilicon NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210764 SR - Enhancements on MIMO for NR WI status report Huawei, HiSilicon NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210765 WP - NR URLLC Work Plan Huawei, HiSilicon NR_L1enh_URLLC-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210766 SR - NU URLLC WI status report Huawei, HiSilicon NR_L1enh_URLLC-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210767 Update to UECapabilityInformation CR China Telecommunications 36.508 16.7.0 CR#1344 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.

withdrawn [WTS] [JSN]
R5-210768 Update PDSCH-TimeDomainResourceAllocationList to consider coreset0 for Demod FR2 test cases CR

revised to R5-211663

Keysight Technologies UK Ltd 38.508-1 16.6.0 CR#1743 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

revised [WTS] [JSN]
R5-210769 Corrections to DL Multi SPS test case CR

revised to R5-211454

Lenovo, Motorola Mobility, MCC TF160 38.523-1 16.6.0 CR#2041 catF NR_IioT-UEConTest Rel-16 R5-90-e

AI: 6.3.14.3

revised [WTS] [JSN]
R5-210770 Update message content in test case 7.3.2.2.2 CR Keysight Technologies UK Ltd 38.521-4 16.6.0 CR#282 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.2

agreed [WTS] [JSN]
R5-210771 Correction in CodebookConfig for 4Tx RI Demod test cases CR Keysight Technologies UK Ltd 38.508-1 16.6.0 CR#1744 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

agreed [WTS] [JSN]
R5-210772 Alignment xOverhead setting with PDSCH RMCs for Demod FR2 testing CR Keysight Technologies UK Ltd 38.508-1 16.6.0 CR#1745 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

agreed [WTS] [JSN]
R5-210773 Correction in 6.4.2.1_1 test requirements CR Keysight Technologies UK Ltd 38.521-4 16.6.0 CR#283 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

agreed [WTS] [JSN]
R5-210774 New WID on UE Conformance Test Aspects – High power UE (power class 2) for EN-DC with 1 LTE band + 1 NR TDD band WID new

revised to R5-211307

China Unicom Rel-17 R5-90-e

AI: 4.1

revised [WTS] [JSN]
R5-210775 On Testability Aspects for FR2 Demodulation Testing discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210776 Correction to the physical configuration for sTTI RF test cases CR Huawei, HiSilicon 36.521-1 16.7.0 CR#5261 catF LTE_sTTIandPT-UEConTest Rel-16 R5-90-e

AI: 5.3.5.2

agreed [WTS] [JSN]
R5-210777 Correction to the physical configuration for sTTI Demod test cases CR Huawei, HiSilicon 36.521-1 16.7.0 CR#5262 catF LTE_sTTIandPT-UEConTest Rel-16 R5-90-e

AI: 5.3.5.2

agreed [WTS] [JSN]
R5-210778 Correction to the physical configuration for sTTI CQI reporting test cases CR Huawei, HiSilicon 36.521-1 16.7.0 CR#5263 catF LTE_sTTIandPT-UEConTest Rel-16 R5-90-e

AI: 5.3.5.2

agreed [WTS] [JSN]
R5-210779 Addition of new test case 6.6.2.1_s SEM for sTTI CR

revised to R5-211755

Huawei, HiSilicon 36.521-1 16.7.0 CR#5264 catF LTE_sTTIandPT-UEConTest Rel-16 R5-90-e

AI: 5.3.5.2

revised [WTS] [JSN]
R5-210780 Addition of new test case 6.6.2.2_s A-SEM for sTTI CR

revised to R5-211903

Huawei, HiSilicon 36.521-1 16.7.0 CR#5265 catF LTE_sTTIandPT-UEConTest Rel-16 R5-90-e

AI: 5.3.5.2

revised [WTS] [JSN]
R5-210781 Addition of new test case 6.6.2.3_s ACLR for sTTI CR

revised to R5-211756

Huawei, HiSilicon 36.521-1 16.7.0 CR#5266 catF LTE_sTTIandPT-UEConTest Rel-16 R5-90-e

AI: 5.3.5.2

revised [WTS] [JSN]
R5-210782 Update of A-MPR minimum requirements for Rel-16 DMRS CR Huawei, HiSilicon 38.521-1 16.6.0 CR#1136 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

agreed [WTS] [JSN]
R5-210783 Adding TP analysis for Rel-16 DMRS in A-MPR test case CR

revised to R5-211809

Huawei, HiSilicon 38.905 16.6.0 CR#350 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

revised [WTS] [JSN]
R5-210784 Adding test point for Rel-16 DMRS in EVM equalizer spectrum flatness test case CR

revised to R5-211807

Huawei, HiSilicon 38.521-1 16.6.0 CR#1137 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

revised [WTS] [JSN]
R5-210785 Update of TP analysis for EVM equalizer spectrum flatness for half Pi BPSK CR

revised to R5-211810

Huawei, HiSilicon 38.905 16.6.0 CR#351 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

revised [WTS] [JSN]
R5-210786 Adding additional TP for half Pi BPSK DMRS to MPR test case for SUL CR

revised to R5-211915

Huawei, HiSilicon 38.521-1 16.6.0 CR#1138 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

revised [WTS] [JSN]
R5-210787 Adding additional TP for half Pi BPSK DMRS to SEM test case for SUL CR Huawei, HiSilicon 38.521-1 16.6.0 CR#1139 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

agreed [WTS] [JSN]
R5-210788 Adding additional TP for half Pi BPSK DMRS to NR ACLR test case for SUL CR Huawei, HiSilicon 38.521-1 16.6.0 CR#1140 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

agreed [WTS] [JSN]
R5-210789 Update of TP analysis for FR1 SUL test cases CR

revised to R5-211811

Huawei, HiSilicon 38.905 16.6.0 CR#352 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

revised [WTS] [JSN]
R5-210790 Addition of new test case 6.4C.2.5 EVM equalizer spectrum flatness for half Pi BPSK DMRS for SUL CR

revised to R5-211808

Huawei, HiSilicon 38.521-1 16.6.0 CR#1141 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

revised [WTS] [JSN]
R5-210791 Adding TP selection for 6.4C.2 Transmit modulation quality for SUL CR Huawei, HiSilicon 38.905 16.6.0 CR#353 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

agreed [WTS] [JSN]
R5-210792 Adding the test applicability of RF test cases for eMIMO CR Huawei, HiSilicon 38.522 16.6.0 CR#58 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.7

agreed [WTS] [JSN]
R5-210793 Update of the test configuration for carrier leakage for SUL CR Huawei, HiSilicon 38.521-1 16.6.0 CR#1142 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-210794 Correction to 5GMM Inter-system mobility test case 9.3.1.2 CR

revised to R5-211404

Keysight Technologies UK 38.523-1 16.6.0 CR#2042 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.6

revised [WTS] [JSN]
R5-210795 Clarification of BWP1 and BWP2 in 4.6.1.3, 4.6.1.4, 4.6.1.6 CR MediaTek Inc. 38.533 16.6.0 CR#1082 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

withdrawn [WTS] [JSN]
R5-210796 Clarification of BWP1 and BWP2 in 7.6.1.3 and 7.6.1.4 CR

revised to R5-211730

MediaTek Inc. 38.533 16.6.0 CR#1083 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

revised [WTS] [JSN]
R5-210797 Revised WID on UE Conformance Test Aspects – Single Radio Voice Call Continuity from 5G to 3G WID revised China Unicom SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 7.4.2

agreed [WTS] [JSN]
R5-210798 Addition of new MDT TC 8.1.6.1.3.1 CR

revised to R5-211485

MediaTek Inc., Tejet, SRTC 38.523-1 16.6.0 CR#2043 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210799 Addition of new MDT TC 8.1.6.1.3.2 CR MediaTek Inc., Tejet, SRTC 38.523-1 16.6.0 CR#2044 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-210800 Addition of new MDT TC 8.1.6.1.3.3 CR

revised to R5-211486

MediaTek Inc., Tejet, SRTC 38.523-1 16.6.0 CR#2045 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

revised [WTS] [JSN]
R5-210801 Adding applicability for new MDT test cases CR MediaTek Inc., Tejet, SRTC 38.523-2 16.6.0 CR#128 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.4

agreed [WTS] [JSN]
R5-210802 Update of clause 5 to R15 TS 38.521-1 CR

revised to R5-211682

China Unicom 38.521-1 16.6.0 CR#1143 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.3

revised [WTS] [JSN]
R5-210803 Update of R16 CADC configurations into TS38.521-1 clause 5 CR

revised to R5-211765

China Unicom, Huawei, HiSilicon, NTT DOCOMO 38.521-1 16.6.0 CR#1144 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.3

revised [WTS] [JSN]
R5-210804 Update of R17 CADC configurations into TS38.521-1 clause 5 CR China Unicom, Huawei, HiSilicon 38.521-1 16.6.0 CR#1145 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.3.3

agreed [WTS] [JSN]
R5-210805 Update IE SemiStaticChannelAccessConfig CR Ericsson 38.508-1 16.6.0 CR#1746 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-210806 Discussion paper on confirming successful resource reservation discussion ROHDE & SCHWARZ Rel-15 R5-90-e

AI: 6.3.2.

noted [WTS] [JSN]
R5-210807 Correction to NR Idle Mode Test Case 6.3.1.7 CR ZTE Corporation 38.523-1 16.6.0 CR#2046 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-210808 Correction to 5GS Non-3GPP Access Test Case 9.2.2.2 CR

revised to R5-211502

ZTE Corporation 38.523-1 16.6.0 CR#2047 catF TEI15_Test, 5GS_Ph1-CT_n3GPPA-UEConTest Rel-16 R5-90-e

AI: 6.4.4.6

revised [WTS] [JSN]
R5-210809 Correction to 5GS Non-3GPP Access Test Case 9.2.4.1 CR ZTE Corporation 38.523-1 16.6.0 CR#2048 catF TEI15_Test, 5GS_Ph1-CT_n3GPPA-UEConTest Rel-16 R5-90-e

AI: 6.4.4.6

agreed [WTS] [JSN]
R5-210810 Correction to 5GS Non-3GPP Access Test Case 9.2.5.1.4 CR ZTE Corporation 38.523-1 16.6.0 CR#2049 catF TEI15_Test, 5GS_Ph1-CT_n3GPPA-UEConTest Rel-16 R5-90-e

AI: 6.4.4.6

agreed [WTS] [JSN]
R5-210811 Correction to 5GS Non-3GPP Access Test Case 9.2.5.2.1 CR ZTE Corporation 38.523-1 16.6.0 CR#2050 catF TEI15_Test, 5GS_Ph1-CT_n3GPPA-UEConTest Rel-16 R5-90-e

AI: 6.4.4.6

withdrawn [WTS] [JSN]
R5-210812 Update IE ServingCellConfig CR Ericsson 38.508-1 16.6.0 CR#1747 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-210813 Update FR2 Downlink and Uplink MU values CR

revised to R5-211638

ANRITSU LTD 38.533 16.6.0 CR#1084 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

revised [WTS] [JSN]
R5-210814 Finalise FR2 Timing MU values CR ANRITSU LTD 38.533 16.6.0 CR#1085 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210815 Update Test Tolerance analyses for FR2 Tx Timing Test cases CR ANRITSU LTD 38.903 16.6.0 CR#203 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-210816 Update of FR2 Tx Timing Test case 5.4.1.1 Test Tolerances CR ANRITSU LTD 38.533 16.6.0 CR#1086 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

agreed [WTS] [JSN]
R5-210817 Update Test Tolerance analyses for FR2 RLM Test cases CR ANRITSU LTD 38.903 16.6.0 CR#204 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-210818 Update Test Tolerance analyses for FR2 Event-Trig Test cases CR ANRITSU LTD 38.903 16.6.0 CR#205 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-210819 Update Test Tolerance analyses for FR2 SS-RSRP Test cases CR ANRITSU LTD 38.903 16.6.0 CR#206 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-210820 Update Test Tolerance analyses for FR1 RLM Test cases CR ANRITSU LTD 38.903 16.6.0 CR#207 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-210821 Update Test Tolerance for FR1 RLM Test Cases CR

revised to R5-211616

ANRITSU LTD 38.533 16.6.0 CR#1087 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210822 Handover of Test Tolerance review process in RAN5 discussion ANRITSU LTD Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210823 Summary of known issues for NR RRM Test cases in 38.533 discussion ANRITSU LTD Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210824 Number of control symbols for RRM tests with 240kHz SSB SCS CR ANRITSU LTD 38.508-1 16.6.0 CR#1748 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

agreed [WTS] [JSN]
R5-210825 Editorial update IE SSB-MTC CR Ericsson 38.508-1 16.6.0 CR#1749 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

withdrawn [WTS] [JSN]
R5-210826 Editorial update IE ServingCellConfigCommon CR Ericsson 38.508-1 16.6.0 CR#1750 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

agreed [WTS] [JSN]
R5-210827 New WID on UE Conformance Test Aspects – LTE-NR & NR-NR Dual Connectivity and NR CA enhancements WID new

revised to R5-211305

Nokia, Nokia Shanghai Bell R5-90-e

AI: 4.1

revised [WTS] [JSN]
R5-210828 FDD Inter Frequency Absolute RSRP Accuracy CA Idle Mode Measurements for Non-Overlapping Carrier CR Nokia, Nokia Shanghai Bell 36.521-3 15.6.0 CR#2557 catF LTE_euCA-UEConTest Rel-15 R5-90-e

AI: 5.3.6.3

withdrawn [WTS] [JSN]
R5-210829 FDD Inter Frequency Absolute RSRP Accuracy CA Idle Mode Measurements for Overlapping Carrier CR Nokia Corporation 36.521-3 15.6.0 CR#2558 catF LTE_euCA-UEConTest Rel-15 R5-90-e

AI: 5.3.6.3

withdrawn [WTS] [JSN]
R5-210830 FDD Inter Frequency Absolute RSRP Accuracy CA Idle Mode Measurements for Overlapping Carrier CR Nokia, Nokia Shanghai Bell 36.521-3 15.6.0 CR#2559 catF LTE_euCA-UEConTest Rel-15 R5-90-e

AI: 5.3.6.3

withdrawn [WTS] [JSN]
R5-210831 FDD Intra Frequency Absolute RSRP Accuracy CA Idle Mode Measurements CR Nokia, Nokia Shanghai Bell 36.521-3 15.6.0 CR#2560 catF LTE_euCA-UEConTest Rel-15 R5-90-e

AI: 5.3.6.3

withdrawn [WTS] [JSN]
R5-210832 Introduction of MU and TT for CA Idle Mode Measurements CR Nokia, Nokia Shanghai Bell 36.521-1 15.6.0 CR#5267 catF LTE_euCA-UEConTest Rel-15 R5-90-e

AI: 5.3.6.2

withdrawn [WTS] [JSN]
R5-210833 Introduction of CA Idle Mode Measurement RRM Testcase Applicabilities CR Nokia, Nokia Shanghai Bell 36.521-2 15.6.0 CR#951 catF LTE_euCA-UEConTest Rel-15 R5-90-e

AI: 5.3.6.2

withdrawn [WTS] [JSN]
R5-210834 Introducing declaration of antenna size D for FR2 tests CR Anritsu 38.508-2 16.6.0 CR#156 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

withdrawn [WTS] [JSN]
R5-210835 Correction to AoA Test Setup applicability per permitted test method CR Anritsu 38.533 16.6.0 CR#1088 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

withdrawn [WTS] [JSN]
R5-210836 Update on FR2 Blocking Test MU CR

revised to R5-211932

Anritsu 38.903 16.6.0 CR#208 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210837 Update MU for FR2 RRM CR

revised to R5-211933

Anritsu 38.903 16.6.0 CR#209 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210838 On MU for FR2 Blocker Test using offset antenna discussion Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210839 On declaration of FR2 antenna implementation and test method applicability discussion Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210840 On Quality of Quiet Zone for DFF discussion Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210841 On MU for FR2 Blocker Test discussion

revised to R5-211945

Anritsu R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-210842 On MU of IFF DFF test method for FR2 RRM discussion Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210843 On FR2 OBW MU discussion

revised to R5-211946

Anritsu R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-210844 On MTSU for FR2 RRM test discussion Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210845 On FR2 relative power measurement uncertainty discussion Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-210846 Update of grouping of test cases in clause 8 CR Huawei, HiSilicon 38.903 16.6.0 CR#210 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-210847 Update of FR1 TT for SCell activation CR

revised to R5-211645

Huawei, HiSilicon 38.903 16.6.0 CR#211 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210848 Update of FR1 TT for SSB based link recovery CR

revised to R5-211646

Huawei, HiSilicon 38.903 16.6.0 CR#212 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210849 Update of FR1 TT for CSI-RS based link recovery CR

revised to R5-211647

Huawei, HiSilicon 38.903 16.6.0 CR#213 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210850 Update of FR1 TT for RRC re-establishment CR

revised to R5-211648

Huawei, HiSilicon 38.903 16.6.0 CR#214 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-210851 Update of FR1 TT for 4.5.5.1 and 4.5.5.2 SSB based LR CR Huawei, HiSilicon 38.533 16.6.0 CR#1089 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210852 Update of FR1 TT for 4.5.5.3 and 4.5.5.4 CSI-RS based LR CR Huawei, HiSilicon 38.533 16.6.0 CR#1090 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210853 Correction to 4.6.4.3 and 4.6.4.4 L1-RSRP reporting delay CR Huawei, HiSilicon 38.533 16.6.0 CR#1091 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-210854 Correction to EN-DC radio link monitoring CR

revised to R5-211617

Huawei, HiSilicon 38.533 16.6.0 CR#1092 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210855 Update of 4.5.3.1 SCell activation and deactivation CR

revised to R5-211618

Huawei, HiSilicon 38.533 16.6.0 CR#1093 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210856 Correction to SA radio link monitoring CR

revised to R5-211626

Huawei, HiSilicon 38.533 16.6.0 CR#1094 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210857 Update of FR1 TT for 6.5.5.1 and 6.5.5.2 SSB based LR CR Huawei, HiSilicon 38.533 16.6.0 CR#1095 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210858 Update of FR1 TT for 6.5.5.3 and 6.5.5.4 CSI-RS based LR CR Huawei, HiSilicon 38.533 16.6.0 CR#1096 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210859 Correction to NR TC 6.6.3.2-Inter-RAT DRX CR

revised to R5-211728

Huawei, HiSilicon 38.533 16.6.0 CR#1097 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210860 Correction to 6.6.4.3 and 6.6.4.4 L1-RSRP reporting delay CR Huawei, HiSilicon 38.533 16.6.0 CR#1098 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210861 Update of 6.5.1.2 and 6.5.1.4 SSB based RLM CR

revised to R5-211729

Huawei, HiSilicon 38.533 16.6.0 CR#1099 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210862 Update of 6.5.2 interruption during measurement on deactivated SCC CR

revised to R5-211612

Huawei, HiSilicon, Keysight 38.533 16.6.0 CR#1100 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210863 Update of 6.5.3.1 SCell activation and deactivation CR Huawei, HiSilicon 38.533 16.6.0 CR#1101 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210864 Update of D.4 antenna configuration CR Huawei, HiSilicon 38.533 16.6.0 CR#1102 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210865 Update of Annex F for Test Tolerance CR

revised to R5-211639

Huawei, HiSilicon 38.533 16.6.0 CR#1103 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

revised [WTS] [JSN]
R5-210866 Correction to CSI-RS RMC CR Huawei, HiSilicon 38.533 16.6.0 CR#1104 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210867 Correction to default configuration on L1-RSRP reporting in Annex H CR Huawei, HiSilicon 38.533 16.6.0 CR#1105 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-210868 Correction to Table F.1.1.2-2 for FR1 test cases CR Huawei, HiSilicon 38.521-4 16.6.0 CR#284 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.4

agreed [WTS] [JSN]
R5-210869 Correction to Test Purpose of PDCCH test cases CR Huawei, HiSilicon 38.521-4 16.6.0 CR#285 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

agreed [WTS] [JSN]
R5-210870 Correction to NR test case 6.2.2.1.2.1 CR

revised to R5-211718

Huawei, HiSilicon 38.521-4 16.6.0 CR#286 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

revised [WTS] [JSN]
R5-210871 Correction to NR TC 9.4B.1.1 CR

revised to R5-211851

Huawei, HiSilicon 38.521-4 16.6.0 CR#287 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.3

revised [WTS] [JSN]
R5-210872 Addition of default configuration of CSI-IM for RRM tests CR

revised to R5-211667

Huawei, HiSilicon 38.508-1 16.6.0 CR#1751 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

revised [WTS] [JSN]
R5-210873 Correction of aperiodic CSI-RS reference configuration for RRM tests CR Huawei, HiSilicon 38.508-1 16.6.0 CR#1752 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

agreed [WTS] [JSN]
R5-210874 Update of 6.2.3A.1_3 Maximum Power Reduction for CA and HPUE CR

revised to R5-211783

Huawei, HiSilicon 36.521-1 16.7.0 CR#5268 catF LTE_TDD_HPUE_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.10.1

revised [WTS] [JSN]
R5-210875 Update of 6.6.2.3_1 ACLR for HPUE CR Huawei, HiSilicon 36.521-1 16.7.0 CR#5269 catF LTE_TDD_HPUE_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.10.1

agreed [WTS] [JSN]
R5-210876 WP - R15 TDD HPUE – Status after RAN5#90-e Work Plan Huawei, HiSilicon LTE_TDD_HPUE_R15-UEConTest Rel-15 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210877 SR - R15 TDD HPUE – Status after RAN5#90-e WI status report Huawei, HiSilicon LTE_TDD_HPUE_R15-UEConTest Rel-15 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210878 WP - R17 NR_CADC_NR_LTE_DC – Status after RAN5#90-e Work Plan Huawei, HiSilicon NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210879 SR - R17 NR_CADC_NR_LTE_DC – Status after RAN5#90-e WI status report Huawei, HiSilicon NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210880 Correction to MultipleCoreset test case CR Lenovo, Motorola Mobility 38.523-1 16.6.0 CR#2051 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 6.3.17.3

agreed [WTS] [JSN]
R5-210881 New MIMO enhancements test case CR Lenovo, Motorola Mobility 38.523-1 16.6.0 CR#2052 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 6.3.17.3

withdrawn [WTS] [JSN]
R5-210882 Correction to NR IMS TC 7.1-Shorter Retry-after period CR Huawei, Hisilicon 34.229-5 15.2.1 CR#114 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-210883 Addition of 6.2.21 TDD Contention Based Random Access on Non-anchor Carrier Test for UE category NB1 UEs In-band mode in Enhanced Coverage CR

revised to R5-211790

Sporton 36.521-3 16.7.0 CR#2561 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

revised [WTS] [JSN]
R5-210884 Addition of 7.1.27 E-UTRAN TDD UE Transmit Timing Accuracy Tests for Category NB1 UE In-Band mode under normal coverage CR

revised to R5-211791

Sporton 36.521-3 16.7.0 CR#2562 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

revised [WTS] [JSN]
R5-210885 Addition of 7.1.28 E-UTRAN TDD - UE Transmit Timing Accuracy Tests for Category NB1 UE In-band mode under enhanced coverage CR

revised to R5-211792

Sporton 36.521-3 16.7.0 CR#2563 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

revised [WTS] [JSN]
R5-210886 Addition of 7.2.15 E-UTRAN TDD TDD UE Timing Advance Adjustment Accuracy Test for UE Category NB1 in Standalone Mode under Enhanced Coverage CR

revised to R5-211793

Sporton 36.521-3 16.7.0 CR#2564 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

revised [WTS] [JSN]
R5-210887 Addition of 7.3.88 TDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 In-band mode in normal coverage CR

revised to R5-211794

Sporton 36.521-3 16.7.0 CR#2565 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

revised [WTS] [JSN]
R5-210888 Addition of 7.3.89 TDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 In-band mode in enhanced coverage CR

revised to R5-211795

Sporton 36.521-3 16.7.0 CR#2566 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

revised [WTS] [JSN]
R5-210889 Addition of applicability for NB-IoT RRM TDD Test Cases CR Sporton 36.521-2 16.7.0 CR#952 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-210890 Addition of Cell configuration mapping for NB-IoT RRM TDD Test Cases in Annex E CR Sporton 36.521-3 16.7.0 CR#2567 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-210891 Correction of Table number for RRM Radio Link Monitoring Test Cases CR

revised to R5-211847

Sporton 36.521-3 16.7.0 CR#2568 catF TEI8_Test Rel-16 R5-90-e

AI: 5.5.1.4

revised [WTS] [JSN]
R5-210892 Update of MU for addition of new NB-IoT TDD Test Cases CR Sporton 36.521-3 16.7.0 CR#2569 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-210893 Update of TX Test Cases for UL MIMO in FR2 CR

revised to R5-211865

Sporton 38.521-2 16.6.0 CR#475 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210894 Correct of test applicability for TC with and without UL CA CR

revised to R5-211845

Sporton 36.521-2 16.7.0 CR#953 catF TEI13_Test Rel-16 R5-90-e

AI: 5.5.1.3

revised [WTS] [JSN]
R5-210895 WP UE Conformance Test Aspects - New Rel-17 NR licensed bands and extension of existing NR bands after 90e Work Plan Huawei, Hisilicon NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210896 SR UE Conformance Test Aspects - New Rel-17 NR licensed bands and extension of existing NR bands after 90e WI status report Huawei, Hisilicon NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210897 Correction to test frequency parameters for band n83 CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1753 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

agreed [WTS] [JSN]
R5-210898 Correction to test frequency parameters for band n84 CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1754 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

agreed [WTS] [JSN]
R5-210899 Removal of the highest SCS from test configuration for Tx spurious emissions for CA CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1146 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-210900 Updating TP analysis for Spurious Emissions for CA in FR1 CR Huawei, Hisilicon 38.905 16.6.0 CR#354 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-210901 Updating test point analysis for FR1 REFSENS for CA test case CR

revised to R5-211606

Huawei, Hisilicon 38.905 16.6.0 CR#355 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-210902 Updating test case 7.3A.1_1 for 4Rx test requirements CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1147 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.2

agreed [WTS] [JSN]
R5-210903 Editorial correction to clause 7.3.1 CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1148 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.2

agreed [WTS] [JSN]
R5-210904 Updating test case 7.3C.2-Reference sensitivity power level for SUL CR

revised to R5-211681

Huawei, Hisilicon, CAICT 38.521-1 16.6.0 CR#1149 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.2

revised [WTS] [JSN]
R5-210905 Updating TP analysis for FR1 REFSENS for SUL testing CR Huawei, Hisilicon 38.905 16.6.0 CR#356 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-210906 Updating A-SEM for MIMO testing for NS_04 CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1150 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-210907 Updating AMPR for MIMO test case for NS_35 CR

revised to R5-211678

Huawei, Hisilicon 38.521-1 16.6.0 CR#1151 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-210908 Updating test applicability of test case 6.5D.2.4.2-UTRA ACLR for UL MIMO CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1152 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-210909 Editorial correction to test case 6.2B.4.1.3 CR Huawei, Hisilicon 38.521-3 16.6.0 CR#882 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-210910 Correction to RB allocation start for test case 6.3D.4.2 CR

revised to R5-211679

Huawei, Hisilicon, Ericsson 38.521-1 16.6.0 CR#1153 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-210911 Correction to test configuration table Test IDs for test case 6.5D.3.3 CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1154 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-210912 Correction to test case 6.2.3 AMPR for NS_24 CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1155 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

agreed [WTS] [JSN]
R5-210913 Updating Transmitter power for CA requiements for CA_n28A-n41A CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1156 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.1

withdrawn [WTS] [JSN]
R5-210914 Updating test case general spurious emission for CA_n28A-n41A CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1157 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.1

withdrawn [WTS] [JSN]
R5-210915 Updating Spurious emission for UE co-existence for CA_n28A-n41A CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1158 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.1

withdrawn [WTS] [JSN]
R5-210916 Addition of TP analysis for CA_n28A-n41A in Tx Spurious Emision cases CR Huawei, Hisilicon 38.905 16.6.0 CR#357 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

withdrawn [WTS] [JSN]
R5-210917 Updating general requirements for intra-band non-contiguous CA CR

revised to R5-211805

Huawei, Hisilicon 38.521-1 16.6.0 CR#1159 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.3

revised [WTS] [JSN]
R5-210918 Updating MOP and MPR for MIMO testing for several NR bands CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1160 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.1

agreed [WTS] [JSN]
R5-210919 Updating 6.5A.3.1.0 for intra-band CA CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1161 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.1

agreed [WTS] [JSN]
R5-210920 Updating test requirement of CA test cases for CA configurations including n90 CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1162 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.1

agreed [WTS] [JSN]
R5-210921 Updating test case 7.3A.2 for CA_n79D CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1163 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.2

withdrawn [WTS] [JSN]
R5-210922 Updating test case 7.6A.4 for band n48 CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1164 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.2

agreed [WTS] [JSN]
R5-210923 Adding NR test case-Time mask for Uplink carriers switching CR

revised to R5-211911

Huawei, Hisilicon 38.521-1 16.6.0 CR#1165 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.1

revised [WTS] [JSN]
R5-210924 Adding TP analysis for NR test case-Time mask for UL carrier switching CR

revised to R5-211914

Huawei, Hisilicon 38.905 16.6.0 CR#358 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.8

revised [WTS] [JSN]
R5-210925 Adding MU and TT for Uplink carriers switching testing CR

revised to R5-211912

Huawei, Hisilicon 38.521-1 16.6.0 CR#1166 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.3

revised [WTS] [JSN]
R5-210926 Introduction of PICS for intra-band non-contiguous CA configurations CR Huawei, Hisilicon 38.508-2 16.6.0 CR#157 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.2

withdrawn [WTS] [JSN]
R5-210927 Updating Rel-17 mid and highest channel bandwitch for n83 and n84 CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1755 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.1

agreed [WTS] [JSN]
R5-210928 Adding Rel-17 CBW 30MHz test frequencies for n83 CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1756 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.1

agreed [WTS] [JSN]
R5-210929 Updating test frequencies for Rel-17 new CBWs for band n84 CR Huawei, Hisilicon 38.508-1 16.6.0 CR#1757 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.1

agreed [WTS] [JSN]
R5-210930 Updating MPR testing for SUL band n83 CR

revised to R5-211837

Huawei, Hisilicon 38.521-1 16.6.0 CR#1167 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.3.1

revised [WTS] [JSN]
R5-210931 Updating AMPR testing for SUL band n83 and n84 CR

revised to R5-211838

Huawei, Hisilicon 38.521-1 16.6.0 CR#1168 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.3.1

revised [WTS] [JSN]
R5-210932 Updating Additional spurious emisisons testing for SUL band n83 and n84 CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1169 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.3.1

agreed [WTS] [JSN]
R5-210933 Updating clause 6.2C.2 for Rel-17 SUL combinations CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1170 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.3.1

agreed [WTS] [JSN]
R5-210934 Updating REFSENS for SUL for new R17 configurations CR Huawei, Hisilicon 38.521-1 16.6.0 CR#1171 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.3.2

agreed [WTS] [JSN]
R5-210935 Discussion about REFSENS for SUL testing for 3CC discussion Huawei, Hisilicon NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.11

noted [WTS] [JSN]
R5-210936 Updating Editors Note in 6.2A.2 and 6.2A.4 for intra-band UL CA CR

revised to R5-211804

Huawei, Hisilicon 38.521-1 16.6.0 CR#1172 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.1

revised [WTS] [JSN]
R5-210937 Introducing PICS for CA_n28A-n41A CR

revised to R5-211602

Huawei, Hisilicon 38.508-2 16.6.0 CR#158 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.2

revised [WTS] [JSN]
R5-210938 Adding PICS for SUL with DL CA configurations CR

revised to R5-211839

Huawei, Hisilicon 38.508-2 16.6.0 CR#159 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.2

revised [WTS] [JSN]
R5-210939 SR UE Conformance Test Aspects- Additional LTE bands for UE category M1 and/or NB1 in Rel-16 WI status report Ericsson LTE_bands_R16_M1_NB1-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210940 WP UE Conformance Test Aspects- Additional LTE bands for UE category M1 and/or NB1 in Rel-16 Work Plan Ericsson LTE_bands_R16_M1_NB1-UEConTest Rel-16 R5-90-e

AI: 7.4.2

available [WTS] [JSN]
R5-210941 Addition of reference sensitivity test point analyses for FR1 NR CA and EN-DC CR

revised to R5-211894

Ericsson, Huawei, Hisilicon 38.905 16.6.0 CR#359 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-210942 Moving of principles for reference sensitivity test point selection from attachments to annexes CR

revised to R5-211895

Ericsson 38.905 16.6.0 CR#360 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-210943 Adding delta TIB and delta RIB for DC_2-7-7-66_n78 CR Huawei, HiSilicon 38.521-3 16.6.0 CR#883 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

agreed [WTS] [JSN]
R5-210944 Removing Editor note in 6.2B.4 configured transmitted power for EN-DC within FR1 CR Huawei, HiSilicon 38.521-3 16.6.0 CR#884 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

withdrawn [WTS] [JSN]
R5-210945 Discussion on the default TDD configuration for EN-DC RF test cases discussion Huawei, HiSilicon 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 5.3.2.17

withdrawn [WTS] [JSN]
R5-210946 Correction to default TDD configuration for EN-DC RF test cases CR Huawei, HiSilicon 36.508 16.7.0 CR#1345 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.

withdrawn [WTS] [JSN]
R5-210947 Removing the reconfiguration of TDD-config across EN-DC Tx test cases CR Huawei, HiSilicon 38.521-3 16.6.0 CR#885 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

withdrawn [WTS] [JSN]
R5-210948 Discussion on the uplink power configuration for EN-DC RF cases discussion

revised to R5-211938

Huawei, HiSilicon 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-210949 Updating the value of P-Max for EN-DC and NR SA test cases CR

revised to R5-211855

Huawei, HiSilicon 38.508-1 16.6.0 CR#1758 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

revised [WTS] [JSN]
R5-210950 Updating the value of PLTE for EN-DC test cases CR

revised to R5-211891

Huawei, HiSilicon 36.508 16.7.0 CR#1346 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.

revised [WTS] [JSN]
R5-210951 Correction to the TDM pattern configuration for EN-DC Tx test cases CR

revised to R5-211872

Huawei, HiSilicon 38.521-3 16.6.0 CR#886 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-210952 Update to 5.4.1.1 EN-DC FR2 UE transmit timing accuracy CR

revised to R5-211603

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1106 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

revised [WTS] [JSN]
R5-210953 Update to 5.4.3.1 EN-DC FR2 timing advance adjustment accuracy CR

revised to R5-211601

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1107 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

revised [WTS] [JSN]
R5-210954 Update to 4.5.4.1 EN-DC FR1 UE UL carrier RRC reconfiguration delay CR

revised to R5-211619

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1108 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210955 Update to 4.7.5.1 EN-DC FR1 SFTD measurement accuracy CR

revised to R5-211620

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1109 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-210956 Update to 6.3.2.2.1 Contention based random access test in FR1 for NR standalone CR

revised to R5-211627

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1110 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210957 Update to 6.3.2.2.2 Non-Contention based random access test in FR1 for NR standalone CR

revised to R5-211628

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1111 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210958 Update to 6.5.2.1 NR SA FR1 interruptions during measurements on deactivated NR SCC CR

revised to R5-211629

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1112 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210959 Update to 6.5.4.1 NR SA FR1 UE UL carrier RRC reconfiguration delay CR Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1113 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-210960 Update to 6.6.3.1 NR SA FR1 - E-UTRAN event-triggered reporting in non-DRX CR

revised to R5-211630

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1114 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210961 Update to 6.6.3.2 NR SA FR1 - E-UTRAN event-triggered reporting in DRX CR

revised to R5-211631

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#1115 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-210962 Spur emission TP analysis R16 DC_2A_n41A CR

revised to R5-211777

Qualcomm Korea, Ericsson 38.905 16.6.0 CR#361 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-210963 Spur emission TP analysis R16 DC_5A_n2A CR Qualcomm Korea 38.905 16.6.0 CR#362 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-210964 GCF 3GPP TCL after GCF CAG#65 report Ericsson R5-90-e

AI: 2.2

noted [WTS] [JSN]
R5-210965 RAN5#90-e summary of changes to RAN5 test cases with potential impact on GCF and PTCRB report Ericsson, Samsung R5-90-e

AI: 7.5

reserved [WTS] [JSN]
R5-210966 3GPP RAN5 CA status list (pre-RAN5#90-e meeting) other Ericsson R5-90-e

AI: 2.2

noted [WTS] [JSN]
R5-210967 3GPP RAN5 CA status list (post-RAN5#90-e meeting) other Ericsson R5-90-e

AI: 7.5

reserved [WTS] [JSN]
R5-210968 WP UE Conformance Test Aspects - Rel-14 LTE CA configurations Work Plan Ericsson LTE_CA_R14-UEConTest Rel-14 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210969 SR UE Conformance Test Aspects - Rel-14 LTE CA configurations WI status report Ericsson LTE_CA_R14-UEConTest Rel-14 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210970 WP UE Conformance Test Aspects - Rel-15 LTE CA configurations Work Plan Ericsson LTE_CA_R15-UEConTest Rel-15 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210971 SR UE Conformance Test Aspects - Rel-15 LTE CA configurations WI status report Ericsson LTE_CA_R15-UEConTest Rel-15 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210972 WP UE Conformance Test Aspects - Rel-16 LTE CA configurations Work Plan Ericsson LTE_CA_R16-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210973 SR UE Conformance Test Aspects - Rel-16 LTE CA configurations WI status report Ericsson LTE_CA_R16-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210974 WP UE Conformance Test Aspects - 5G system with NR and LTE Work Plan Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210975 SR UE Conformance Test Aspects - 5G system with NR and LTE WI status report Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210976 5GS progress report RAN5#90-e WI status report Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 7.5

reserved [WTS] [JSN]
R5-210977 Update of RAN5 5G NR phases and target update RAN5#90-e discussion Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 7.5

reserved [WTS] [JSN]
R5-210978 WP UE Conformance Test Aspects - New Rel-16 NR bands and extension of existing NR bands Work Plan Ericsson NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210979 SR UE Conformance Test Aspects - New Rel-16 NR bands and extension of existing NR bands WI status report Ericsson NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-210980 Spur emission TP analysis R16 DC_13A_n2A CR

revised to R5-211778

Qualcomm Korea 38.905 16.6.0 CR#363 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-210981 Spur emission TP analysis R16 DC_48A_n5A CR

revised to R5-211779

Qualcomm Korea 38.905 16.6.0 CR#364 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-210982 Spur emission TP analysis R16 DC_48A_n66A CR

revised to R5-211780

Qualcomm Korea 38.905 16.6.0 CR#365 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-210983 Revised WID: UE Conformance Test Aspects - 5G system with NR and LTE WID revised Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 7.4.2

agreed [WTS] [JSN]
R5-210984 Checklist - Adding new NR band or channel bandwidth to existing bands other Ericsson R5-90-e

AI: 4.2.1

noted [WTS] [JSN]
R5-210985 Spur emission TP analysis R16 DC_66A_n41A CR

revised to R5-211781

Qualcomm Korea, Ericsson 38.905 16.6.0 CR#366 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-210986 Update for 6.5B.3.3.2 Spurious emission band UE co-existence_Rel16 CR

revised to R5-211769

Qualcomm Korea 38.521-3 16.6.0 CR#887 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

revised [WTS] [JSN]
R5-210987 Update for 6.5B.3.3.2 Spurious emission band UE co-existence CR

revised to R5-211852

Qualcomm Korea 38.521-3 16.6.0 CR#888 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-210988 Change of RB allocation start in test case 6.3D.4.2 CR Ericsson 38.521-1 16.6.0 CR#1173 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-210989 Update for 7.3B.2.0 Minimum Conformance Requirements of Reference sensitivity for EN-DC CR Qualcomm Korea 38.521-3 16.6.0 CR#889 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-210990 Addition of Note 7 in the Additional Information column of RF conformance test cases with 2Rx and 4Rx Branch in secton 8 and section 9 CR CAICT 36.521-2 16.7.0 CR#954 catF TEI8_Test Rel-16 R5-90-e

AI: 5.5.1.3

agreed [WTS] [JSN]
R5-210991 Update for 7.3.2 Reference sensitivity power level CR Qualcomm Korea 38.521-1 16.6.0 CR#1174 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.2

agreed [WTS] [JSN]
R5-210992 Correction to XCAP test case 15.5 CR Qualcomm Incorporated 34.229-1 15.6.0 CR#1459 catF TEI8_Test Rel-15 R5-90-e

AI: 6.6.6.1

agreed [WTS] [JSN]
R5-210993 Editorial, cleanup of some references in 38.521-4 CR Ericsson 38.521-4 16.6.0 CR#288 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

agreed [WTS] [JSN]
R5-210994 Update to default MCPTT media plane control messages CR MCC TF160 36.579-1 15.0.0 CR#120 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-210995 Update for 6.5.3.2 Spurious emission for UE co-existence_R15 CR Qualcomm Korea 38.521-1 16.6.0 CR#1175 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-210996 Addition of test case 6.5D.2_1.4.2, UTRA ACLR for UL MIMO (Rel-16 onward) CR Ericsson 38.521-1 16.6.0 CR#1176 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

agreed [WTS] [JSN]
R5-210997 Update for 6.5.3.2 Spurious emission for UE co-existence_R16 CR

revised to R5-211788

Qualcomm Korea, Keysight 38.521-1 16.6.0 CR#1177 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

revised [WTS] [JSN]
R5-210998 Correction to applicability conditions of test cases 8.1.4.2.1.2 and 11.1.9 CR Qualcomm Incorporated, MCC TF160 38.523-2 16.6.0 CR#129 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.5

agreed [WTS] [JSN]
R5-210999 TP analysis for test case 6.5D.1_1, Occupied bandwidth for UL MIMO (Rel-16 onward) CR Ericsson 38.905 16.6.0 CR#367 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

withdrawn [WTS] [JSN]
R5-211000 Correction to EN-DC Wideband Intermodulation tests CR

revised to R5-211854

Bureau Veritas, Anritsu 38.521-3 16.6.0 CR#890 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211001 Update to NR FR1 2Rx-4Rx implementation Capabilities CR Bureau Veritas, Samsung 38.508-2 16.6.0 CR#160 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-211002 Correction to TC6.4.2.5 EVM equalizer spectrum flatness for Pi2 BPSK CR Bureau Veritas 38.521-3 16.6.0 CR#891 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-211003 Update to applicability spec for 5G test cases CR

revised to R5-211853

Bureau Veritas, ROHDE & SCHWARZ, TTA, KTL, Ericsson, Huawei, HiSilicon, CAICT, Google Inc., Anritsu 38.522 16.6.0 CR#59 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

revised [WTS] [JSN]
R5-211004 Update to EN-DC R15 Configuration information in clause 5 CR Bureau Veritas 38.521-3 16.6.0 CR#892 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.3

withdrawn [WTS] [JSN]
R5-211005 Update to EN-DC R16 Configuration information in clause 5 CR Bureau Veritas, Ericsson 38.521-3 16.6.0 CR#893 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.3

agreed [WTS] [JSN]
R5-211006 Update to EN-DC R17 Configuration information in clause 5 CR Bureau Veritas 38.521-3 16.6.0 CR#894 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.5.3

withdrawn [WTS] [JSN]
R5-211007 Correction to NR TC 9.1.8.1-SMS CR

revised to R5-211403

Huawei, Hisilicon 38.523-1 16.6.0 CR#2053 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.5

revised [WTS] [JSN]
R5-211008 Update of CA_n1A-n78C into 3DL CA Refsense TC 7.3A.2 CR China Unicom 38.521-1 16.6.0 CR#1178 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

agreed [WTS] [JSN]
R5-211009 Update to NR RRC test case 8.1.1.3.2 CR

revised to R5-211388

Qualcomm Incorporated 38.523-1 16.6.0 CR#2054 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.1

revised [WTS] [JSN]
R5-211010 Update of reference sensitivity for intra-band contiguous EN-DC CR Huawei, HiSilicon 38.521-3 16.6.0 CR#895 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211011 Update of reference sensitivity for intra-band non-contiguous EN-DC CR

revised to R5-211876

Huawei, HiSilicon 38.521-3 16.6.0 CR#896 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211012 Update of reference sensitivity for inter-band 2CC EN-DC CR

revised to R5-211877

Huawei, HiSilicon 38.521-3 16.6.0 CR#897 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211013 Correction to refsens test requirements for DC_1A-7A_n78A CR

revised to R5-211878

Huawei, HiSilicon, Keysight Technologies UK Ltd, Ericsson 38.521-3 16.6.0 CR#898 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211014 Adding in-gap tests to ACS for intra-band non-contiguous EN-DC CR Huawei, HiSilicon 38.521-3 16.6.0 CR#899 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211015 Discussion on test coverage for reference sensitivity for EN-DC configs with exceptions discussion

revised to R5-211939

Huawei, HiSilicon 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211016 Update of test configuration for inter-band 2CC EN-DC configurations affected by reference sensitivity exceptions CR

revised to R5-211879

Huawei, HiSilicon 38.521-3 16.6.0 CR#900 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211017 Update of test coverage for reference sensitivity for 3CC EN-DC CR Huawei, HiSilicon 38.521-3 16.6.0 CR#901 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211018 TP analysis for test case 6.5D.2_1.4.2, UTRA ACLR for UL MIMO (Rel-16 onward) CR Ericsson 38.905 16.6.0 CR#368 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

agreed [WTS] [JSN]
R5-211019 Update of Inter system mobility test case 9.3.1.1 CR

revised to R5-211405

Qualcomm Incorporated 38.523-1 16.6.0 CR#2055 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.6

revised [WTS] [JSN]
R5-211020 Adding EN-DC configurations DC_1A-28A_n3A and DC_7A-28A_n3A to clause 5.5B.4.2 CR Ericsson 38.521-3 16.6.0 CR#902 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.3

agreed [WTS] [JSN]
R5-211021 Adding Delta TIB,c for DC_1A-28A_n3A, DC_7A-20A_n1A and DC_7A-28A_n3A to clause 6.2B.4.2.3.3 CR

revised to R5-211770

Ericsson 38.521-3 16.6.0 CR#903 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

revised [WTS] [JSN]
R5-211022 Update to idle mode test cases 6.2.1.2, 6.2.1.3, 6.4.3.1 CR Qualcomm Incorporated 38.523-1 16.6.0 CR#2056 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211023 Correction to LTE test case 8.2.4.1 for CAT-M mode UEs CR

revised to R5-211345

ROHDE & SCHWARZ 36.523-1 16.7.0 CR#5011 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.2

revised [WTS] [JSN]
R5-211024 Update of Tx test procedure for PC2 UE on FDD bands due to maxUplinkDutyCycle CR

revised to R5-211608

Huawei, HiSilicon, Bureau Veritas 38.521-1 16.6.0 CR#1179 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-211025 Update of UAC test case 11.3.6 CR

revised to R5-211409

Qualcomm Incorporated 38.523-1 16.6.0 CR#2057 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.3

revised [WTS] [JSN]
R5-211026 Update of CA_n1A-n78C into 3DL CA maximum input level TC 7.4A.2 CR China Unicom 38.521-1 16.6.0 CR#1180 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

agreed [WTS] [JSN]
R5-211027 Update to NR RRC test case 8.1.5.8.1 CR Qualcomm Incorporated 38.523-1 16.6.0 CR#2058 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

withdrawn [WTS] [JSN]
R5-211028 Addition of new test case 6.2A.1.1.4 UE maximum output power - EIRP and TRP for 5UL CA CR

revised to R5-211688

KTL 38.521-2 16.6.0 CR#476 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211029 Addition of new test case 6.2A.1.1.5 UE maximum output power - EIRP and TRP for 6UL CA CR

revised to R5-211689

KTL 38.521-2 16.6.0 CR#477 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211030 Addition of new test case 6.2A.1.1.6 UE maximum output power - EIRP and TRP for 7UL CA CR

revised to R5-211690

KTL 38.521-2 16.6.0 CR#478 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211031 Addition of new test case 6.2A.1.1.7 UE maximum output power - EIRP and TRP for 8UL CA CR

revised to R5-211691

KTL 38.521-2 16.6.0 CR#479 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211032 Correction test frequencies for CA_n261(2A) CR Ericsson 38.508-1 16.6.0 CR#1759 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

agreed [WTS] [JSN]
R5-211033 Correction test frequencies for CA_n261(2A) for protocol testing CR Ericsson 38.508-1 16.6.0 CR#1760 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.4

agreed [WTS] [JSN]
R5-211034 Correction of protocol applicability for test frequencies for DC_xA_n261(2A) configurations CR Ericsson 38.508-1 16.6.0 CR#1761 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.4

agreed [WTS] [JSN]
R5-211035 Introduction of UE capabilities for Rel-15 EN-DC FR1 configurations CR

revised to R5-211861

Ericsson 38.508-2 16.6.0 CR#161 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

revised [WTS] [JSN]
R5-211036 Introduction of UE capabilities for Rel-15 EN-DC FR2 configuration CA_n261(2A) CR

revised to R5-211674

Ericsson 38.508-2 16.6.0 CR#162 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

revised [WTS] [JSN]
R5-211037 Addition of minimum requirement for intra-band UL CA in the test case 6.4A.2 CR KTL 38.521-1 16.6.0 CR#1181 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.1

agreed [WTS] [JSN]
R5-211038 Addition of procedure for clearing Ues Last Registered PLMN CR

revised to R5-211373

Qualcomm Incorporated 38.508-1 16.6.0 CR#1762 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

revised [WTS] [JSN]
R5-211039 Issues with pre-established session establishment discussion UPV/EHU, Nemergent Solutions R5-90-e

AI: 6.6.9.9

noted [WTS] [JSN]
R5-211040 Addition of 70M into 38.521-1 TC6.3A.1 CR China Unicom 38.521-1 16.6.0 CR#1182 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

agreed [WTS] [JSN]
R5-211041 Addition of 70M into 38.521-1 TC6.3D CR China Unicom 38.521-1 16.6.0 CR#1183 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

agreed [WTS] [JSN]
R5-211042 Spurious emissions for UE co-existence update to core specs CR

revised to R5-211613

Keysight Technologies UK Ltd 38.521-1 16.6.0 CR#1184 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-211043 Addition of new IMS over 5GS TC 8.38 Communication Waiting and cancelling the call / 5GS CR

revised to R5-211447

Qualcomm Incorporated 34.229-5 15.2.1 CR#115 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-211044 Update of References in 36.579-1 CR

revised to R5-211354

Samsung 36.579-1 15.0.0 CR#121 catF TEI14_Test Rel-15 R5-90-e

AI: 6.6.9.1

revised [WTS] [JSN]
R5-211045 Discussion paper on impact of UE’s highest channel bandwidth capability on Transport Block Selection test cases discussion

revised to R5-211362

Qualcomm Incorporated 5GS_NR_LTE-UEConTest R5-90-e

AI: 6.3.2.

revised [WTS] [JSN]
R5-211046 Update message content for PMI reporting test cases CR

revised to R5-211664

Keysight Technologies UK Ltd 38.508-1 16.6.0 CR#1763 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

revised [WTS] [JSN]
R5-211047 Clarification on the connection diagram for FR2 demod and RRM test cases CR

revised to R5-211673

Anritsu 38.508-1 16.6.0 CR#1764 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

revised [WTS] [JSN]
R5-211048 Correction to test tolerance for FR1 blocking tests CR Anritsu 38.521-1 16.6.0 CR#1185 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.3

agreed [WTS] [JSN]
R5-211049 Additional of default downlink level for FR2 CR Anritsu 38.533 16.6.0 CR#1116 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-211050 Updating applicability in test case 5.2.2.2.4_1 CR Ericsson 38.521-4 16.6.0 CR#289 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

agreed [WTS] [JSN]
R5-211051 Introduction of additional Rel-15 EN-DC inter-band configurations to EN-DC MOP test case 6.2B.1.3 CR Ericsson 38.521-3 16.6.0 CR#904 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-211052 Introduction of dTIB,c for inter-band EN-DC Rel-15 EN-DC inter-band configurations CR Ericsson 38.521-3 16.6.0 CR#905 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-211053 Introduction of Rel-15 EN-DC configuration DC_8A_n77A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211699

Ericsson 38.521-3 16.6.0 CR#906 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211054 Introduction of Rel-15 EN-DC configuration DC_11A_n77A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211700

Ericsson 38.521-3 16.6.0 CR#907 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211055 Introduction of Rel-15 EN-DC configuration DC_11A_n78A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211701

Ericsson 38.521-3 16.6.0 CR#908 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211056 Introduction of Rel-15 EN-DC configuration DC_11A_n79A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211702

Ericsson 38.521-3 16.6.0 CR#909 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211057 Introduction of Rel-15 EN-DC configuration DC_25A_n41A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211703

Ericsson 38.521-3 16.6.0 CR#910 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211058 Introduction of Rel-15 EN-DC configuration DC_26A_n41A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211704

Ericsson 38.521-3 16.6.0 CR#911 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211059 Introduction of Rel-15 EN-DC configuration DC_26A_n77A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211705

Ericsson 38.521-3 16.6.0 CR#912 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211060 Introduction of Rel-15 EN-DC configuration DC_26A_n78A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211706

Ericsson 38.521-3 16.6.0 CR#913 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211061 Introduction of Rel-15 EN-DC configuration DC_26A_n79A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211707

Ericsson 38.521-3 16.6.0 CR#914 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211062 Introduction of Rel-15 EN-DC configuration DC_41A_n77A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211708

Ericsson 38.521-3 16.6.0 CR#915 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211063 Introduction of Rel-15 EN-DC configuration DC_41A_n78A to spurious emission test case 6.5B.3.3.2 CR

revised to R5-211709

Ericsson 38.521-3 16.6.0 CR#916 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211064 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_8A_n77A CR

revised to R5-211737

Ericsson 38.905 16.6.0 CR#369 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211065 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_11A_n77A CR

revised to R5-211738

Ericsson 38.905 16.6.0 CR#370 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211066 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_11A_n78A CR

revised to R5-211739

Ericsson 38.905 16.6.0 CR#371 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211067 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_11A_n79A CR

revised to R5-211740

Ericsson 38.905 16.6.0 CR#372 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211068 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_25A_n41A CR

revised to R5-211741

Ericsson 38.905 16.6.0 CR#373 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211069 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_26A_n41A CR

revised to R5-211742

Ericsson 38.905 16.6.0 CR#374 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211070 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_26A_n77A CR

revised to R5-211743

Ericsson 38.905 16.6.0 CR#375 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211071 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_26A_n78A CR

revised to R5-211744

Ericsson 38.905 16.6.0 CR#376 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211072 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_26A_n79A CR

revised to R5-211745

Ericsson 38.905 16.6.0 CR#377 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211073 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_41A_n77A CR

revised to R5-211746

Ericsson 38.905 16.6.0 CR#378 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211074 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_41A_n78A CR

revised to R5-211747

Ericsson 38.905 16.6.0 CR#379 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211075 Adding new test case 6.3.2.2.3, 2Rx TDD FR1 Single PMI with 16Tx Type1 - SinglePanel codebook for both SA and NSA CR

revised to R5-211813

Ericsson 38.521-4 16.6.0 CR#290 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

revised [WTS] [JSN]
R5-211076 Introduction of test frequencies for n41 adding CBW 70 MHz CR Ericsson 38.508-1 16.6.0 CR#1765 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.1

withdrawn [WTS] [JSN]
R5-211077 Introduction of test frequencies for n48 adding CBW 70 MHz - DL only CR

revised to R5-211836

Ericsson 38.508-1 16.6.0 CR#1766 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.1

revised [WTS] [JSN]
R5-211078 Adding new test case 6.3.2.2.4, 2Rx TDD FR1 Single PMI with 32Tx Type1 - SinglePanel codebook for both SA and NSA CR

revised to R5-211916

Ericsson 38.521-4 16.6.0 CR#291 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

revised [WTS] [JSN]
R5-211079 Adding new test case 6.3.3.2.3, 4Rx TDD FR1 Single PMI with 16Tx Type1 - SinglePanel codebook for both SA and NSA CR

revised to R5-211814

Ericsson 38.521-4 16.6.0 CR#292 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

revised [WTS] [JSN]
R5-211080 New WID on UE Conformance Test Aspects for NR-based Access to Unlicensed Spectrum WID new

revised to R5-211306

Qualcomm Wireless GmbH R5-90-e

AI: 4.1

revised [WTS] [JSN]
R5-211081 Update to downlink physical channel EPRE level for LTE-NR coex scenario CR Qualcomm Wireless GmbH 38.521-4 16.6.0 CR#293 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.4

agreed [WTS] [JSN]
R5-211082 Test case structure updates for CA PDSCH Demodulation test cases discussion

revised to R5-211942

Qualcomm Wireless GmbH NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.7

revised [WTS] [JSN]
R5-211083 Input on fading crest factor margin for FR2 Demodulation test cases discussion

revised to R5-211947

Qualcomm Wireless GmbH 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211084 Update to FR2 PDSCH test case for maximum testable SNR CR Qualcomm Wireless GmbH 38.521-4 16.6.0 CR#294 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.2

withdrawn [WTS] [JSN]
R5-211085 Update to FR2 CQI reporting test case for maximum testable SNR CR Qualcomm Wireless GmbH 38.521-4 16.6.0 CR#295 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.2

withdrawn [WTS] [JSN]
R5-211086 Adding new CSI test cases to annex F CR Ericsson 38.521-4 16.6.0 CR#296 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.4

agreed [WTS] [JSN]
R5-211087 New WID - UE Conformance Test Aspects - Support of eCall over IMS for NR WID new

revised to R5-211308

Qualcomm Incorporated Rel-16 R5-90-e

AI: 4.1

revised [WTS] [JSN]
R5-211088 Correction to A-MPR test requirement of NS_22 in TC 6.2.4 CR

revised to R5-211920

Anritsu 36.521-1 16.7.0 CR#5270 catF TEI8_Test Rel-16 R5-90-e

AI: 5.5.1.2.1

revised [WTS] [JSN]
R5-211089 Clarification on the initialBWP condition in PDCCH-ConfigCommon in 4.6.3 CR Anritsu 38.508-1 16.6.0 CR#1767 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

withdrawn [WTS] [JSN]
R5-211090 Correction to the message contents for CQI reporting tests in 5.4.2.4 CR

revised to R5-211856

Anritsu 38.508-1 16.6.0 CR#1768 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

revised [WTS] [JSN]
R5-211091 Correction to the message contents for PMI reporting tests in 5.4.2.5 CR

revised to R5-211857

Anritsu 38.508-1 16.6.0 CR#1769 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

revised [WTS] [JSN]
R5-211092 Test ID separation to powerBoostPiBPSK 1 and 0 in Table 6.5.2.2.4.1-1 CR Anritsu 38.521-1 16.6.0 CR#1186 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-211093 Correction to ACLR relaxation value in TC 6.5.2.3 CR

revised to R5-211921

Anritsu 38.521-2 16.6.0 CR#480 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211094 Correction to assumption of aggregated channel bandwidth in TC 6.5A.2.2 CR Anritsu 38.521-2 16.6.0 CR#481 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211095 Correction to definition of power control window size in FR2 relative power tolerance in TC 6.3.4.3 CR

revised to R5-211866

Anritsu 38.521-2 16.6.0 CR#482 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211096 Correction to editors note about beam peak direction CR Anritsu 38.521-2 16.6.0 CR#483 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.2

withdrawn [WTS] [JSN]
R5-211097 Definition of relaxation value of spurious emissions UE co-existence in TC 6.5.3.2 CR Anritsu 38.521-2 16.6.0 CR#484 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211098 Update FR2 MU and TT in 38.521-2 CR

revised to R5-211923

Anritsu 38.521-2 16.6.0 CR#485 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

revised [WTS] [JSN]
R5-211099 Correction to editors note about number of E-UTRA carriers CR Anritsu 38.521-3 16.6.0 CR#917 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211100 Correction to MOP and MPR test procedures for PC2 in TC 6.2B.1.3 and 6.2B.2.1 CR

revised to R5-211873

Anritsu 38.521-3 16.6.0 CR#918 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

revised [WTS] [JSN]
R5-211101 Correction to test points of FR1 EN-DC intermodulation with 3CC in TC 7.8B.2.6 CR

revised to R5-211687

Anritsu 38.521-3 16.6.0 CR#919 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211102 Update FR2 MU and TT in 38.521-3 CR

revised to R5-211928

Anritsu 38.521-3 16.6.0 CR#920 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.3

revised [WTS] [JSN]
R5-211103 Update FR2 MU and TT in 38.903 CR

revised to R5-211934

Anritsu 38.903 16.6.0 CR#215 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-211104 Correction of parameters of FR2 ACLR test cases discussion Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211105 The degradation of TE noise floor for ON OFF time mask and how to avoid it discussion Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211106 Discussion on subclause drafting rules in RAN5 specs discussion ZTE Corporation R5-90-e

AI: 4.2.2

noted [WTS] [JSN]
R5-211107 Corrections to subclauses in 38.508-1 with appropriate subclause level and heading styles CR ZTE Corporation 38.508-1 16.6.0 CR#1770 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

agreed [WTS] [JSN]
R5-211108 Corrections to subclauses in 38.508-2 with appropriate subclause level and heading styles CR ZTE Corporation 38.508-2 16.6.0 CR#163 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-211109 Corrections to subclauses in 38.521-1 with appropriate subclause level and heading styles CR ZTE Corporation 38.521-1 16.6.0 CR#1187 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-211110 Corrections to subclauses in 38.521-2 with appropriate subclause level and heading styles CR ZTE Corporation 38.521-2 16.6.0 CR#486 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211111 Corrections to subclauses in 38.521-3 with appropriate subclause level and heading styles CR ZTE Corporation 38.521-3 16.6.0 CR#921 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211112 Discussion on inter-band CA configurations in RAN5 specs discussion ZTE Corporation R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211113 Corrections to reference figures for transmission bandwidth in FR1 CR ZTE Corporation 38.521-1 16.6.0 CR#1188 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-211114 Corrections to reference figures for transmission bandwidth configuration in FR2 CR

revised to R5-211692

ZTE Corporation 38.521-2 16.6.0 CR#487 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211115 Update of 4.3.1.1.3.40.1 for test frequency of NR intra-band contiguous CA_n40B CR ZTE Corporation 38.508-1 16.6.0 CR#1771 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.1

withdrawn [WTS] [JSN]
R5-211116 Update of 4.3.1.1.3.41.1 for test frequency of NR intra-band contiguous CA_n41C CR ZTE Corporation 38.508-1 16.6.0 CR#1772 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

agreed [WTS] [JSN]
R5-211117 Update of 4.3.1.1.3.66.1 for test frequency of NR intra-band contiguous CA_n66B CR ZTE Corporation 38.508-1 16.6.0 CR#1773 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.1

agreed [WTS] [JSN]
R5-211118 Update of 4.3.1.1.3.78.1 for test frequency of NR intra-band contiguous CA_n78C CR ZTE Corporation 38.508-1 16.6.0 CR#1774 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

agreed [WTS] [JSN]
R5-211119 Update of 4.3.1.1.3.78.2 for test frequency of NR intra-band contiguous CA_n78B CR ZTE Corporation 38.508-1 16.6.0 CR#1775 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.1

withdrawn [WTS] [JSN]
R5-211120 Update of 4.3.1.0A for mid test channel bandwidth CR

revised to R5-211784

ZTE Corporation, Ericsson 38.508-1 16.6.0 CR#1776 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.1

revised [WTS] [JSN]
R5-211121 Update of 4.3.1.3.2.1 for test frequencies for NR-DC configurations between FR1 and FR2 CR ZTE Corporation 38.508-1 16.6.0 CR#1777 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.1

agreed [WTS] [JSN]
R5-211122 Update of 4.3.1.4.1 for test frequencies for EN-DC band combinations within FR1 CR

revised to R5-211762

ZTE Corporation 38.508-1 16.6.0 CR#1778 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.1

revised [WTS] [JSN]
R5-211123 Update of 4.3.1.5.1 for test frequencies for EN-DC band combinations including FR2 CR

revised to R5-211763

ZTE Corporation 38.508-1 16.6.0 CR#1779 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.1

revised [WTS] [JSN]
R5-211124 Update of 4.3.1.6.1.3 for test frequencies for EN-DC band combinations including FR1 and FR2 CR ZTE Corporation 38.508-1 16.6.0 CR#1780 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.1

agreed [WTS] [JSN]
R5-211125 Update of 5.3B for UE channel bandwidth for EN-DC CR ZTE Corporation 38.521-3 16.6.0 CR#922 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.3

agreed [WTS] [JSN]
R5-211126 Update of 5.5A.2 for corrections to configurations for intra-band non-contiguous CA CR ZTE Corporation 38.521-2 16.6.0 CR#488 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-211127 Minor corrections of 4.1 for test environment conditions CR ZTE Corporation 36.508 16.7.0 CR#1347 catF TEI16_Test Rel-16 R5-90-e

AI: 5.5.1.1

agreed [WTS] [JSN]
R5-211128 Correction of Table A.4.3.2B.2.3.12-1 CR

revised to R5-211449

Google Inc. 38.508-2 16.6.0 CR#164 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 6.3.7.2

revised [WTS] [JSN]
R5-211129 Introduction of dRIB,c for inter-band EN-DC Rel-15 EN-DC inter-band configurations CR Ericsson 38.521-3 16.6.0 CR#923 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-211130 Completion C384 and C385 of Table 4-1a CR

revised to R5-211451

Google Inc. 36.523-2 16.7.0 CR#1337 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 6.3.11.4

revised [WTS] [JSN]
R5-211131 WP UE Conformance Test Aspects – Rel14 Enhanced Full Dimension MIMO for LTE Work Plan Ericsson LTE_eFDMIMO-UEConTest R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211132 SR UE Conformance Test Aspects – Rel14 Enhanced Full Dimension MIMO for LTE WI status report Ericsson LTE_eFDMIMO-UEConTest R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211133 Addition of ULFPTx in MPR test case CR Ericsson 38.521-1 16.6.0 CR#1189 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

agreed [WTS] [JSN]
R5-211134 TP analysis for ULFPTx in MPR test case CR Ericsson 38.905 16.6.0 CR#380 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

agreed [WTS] [JSN]
R5-211135 Discussion on test points for EN-DC refsens with exception avoiding discussion

revised to R5-211940

Ericsson 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211136 TP analysis update for EN_DC refsens CR

revised to R5-211896

Ericsson 38.905 16.6.0 CR#381 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211137 Update of 2CC refsens test case 7.3B.2.3 CR

revised to R5-211880

Ericsson 38.521-3 16.6.0 CR#924 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211138 Update of 3CC refsens test case 7.3B.2.3_1.1 CR

revised to R5-211881

Ericsson 38.521-3 16.6.0 CR#925 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211139 Correction of configurations not to be tested in 4CC refsens test case 7.3B.2.3_1.2 CR

revised to R5-211882

Ericsson 38.521-3 16.6.0 CR#926 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211140 TP analysis for DC_8A_n77A CR

revised to R5-211897

Ericsson 38.905 16.6.0 CR#382 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211141 Addition of DC_8A_n77A in test case 7.3B.2.3 CR

revised to R5-211883

Ericsson 38.521-3 16.6.0 CR#927 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211142 TP analysis for DC_11A_n79A CR

revised to R5-211898

Ericsson 38.905 16.6.0 CR#383 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211143 Addition of DC_11A_n79A in test case 7.3B.2.3 CR

revised to R5-211884

Ericsson 38.521-3 16.6.0 CR#928 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211144 TP analysis for DC_26A_n41A CR

revised to R5-211899

Ericsson 38.905 16.6.0 CR#384 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211145 Addition of DC_26A_n41A in test case 7.3B.2.3 CR

revised to R5-211885

Ericsson 38.521-3 16.6.0 CR#929 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211146 TP analysis for DC_26A_n77A and DC_26A_n78A CR

revised to R5-211900

Ericsson 38.905 16.6.0 CR#385 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211147 Addition of DC_26A_n77A and DC_26A_n78A in test case 7.3B.2.3 CR

revised to R5-211886

Ericsson 38.521-3 16.6.0 CR#930 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211148 TP analysis for DC_26A_n79A CR

revised to R5-211901

Ericsson 38.905 16.6.0 CR#386 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211149 Addition of DC_26A_n79A in test case 7.3B.2.3 CR

revised to R5-211887

Ericsson 38.521-3 16.6.0 CR#931 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211150 TP analysis for DC_41A_n77A and DC_41A_n78A CR

revised to R5-211902

Ericsson 38.905 16.6.0 CR#387 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211151 Addition of DC_41A_n77A and DC_41A_n78A in test case 7.3B.2.3 CR

revised to R5-211888

Ericsson 38.521-3 16.6.0 CR#932 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

revised [WTS] [JSN]
R5-211152 Updates to global conditions used in default messages CR MCC TF160 36.579-1 15.0.0 CR#122 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

withdrawn [WTS] [JSN]
R5-211153 WP UE Conformance Test Aspects- Even further mobility enhancement for E-UTRAN after RAN5#90-e Work Plan China Telecom LTE_feMob-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211154 SR UE Conformance Test Aspects- Even further mobility enhancement for E-UTRAN after RAN5#90-e WI status report China Telecom LTE_feMob-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211155 WP UE Conformance Test Aspects for add support of NR DL 256QAM for FR2 Work Plan China Telecom NR_DL256QAM_FR2-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211156 SR UE Conformance Test Aspects for add support of NR DL 256QAM for FR2 WI status report China Telecom NR_DL256QAM_FR2-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211157 SR UE Conformance Test Aspects for NR performance requirement enhancement after RAN5#90-e WI status report China Telecom NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211158 Addition of applicability new test case 6.3.2.1.3 in TS 38.521-4 CR China Telecom 38.522 16.6.0 CR#60 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.4

agreed [WTS] [JSN]
R5-211159 Addition of applicability new test case 6.3.3.1.3 in TS 38.521-4 CR China Telecom 38.522 16.6.0 CR#61 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.4

agreed [WTS] [JSN]
R5-211160 Addition of new test case 6.3.2.1.3 2Rx FDD FR1 Multiple PMI with 16Tx Type1 - SinglePanel codebook for both SA and NSA CR

revised to R5-211658

China Telecom 38.521-4 16.6.0 CR#297 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

revised [WTS] [JSN]
R5-211161 Addition of new test case 6.3.3.1.3 4Rx FDD FR1 Multiple PMI with 16Tx Type1 - SinglePanel codebook for both SA and NSA CR

revised to R5-211659

China Telecom 38.521-4 16.6.0 CR#298 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

revised [WTS] [JSN]
R5-211162 Addition of E-UTRAN TC 8.2.4.30.1 DAPS handover CR

revised to R5-211452

China Telecom 36.523-1 16.7.0 CR#5012 catF LTE_feMob-UEConTest Rel-16 R5-90-e

AI: 6.3.13.2

revised [WTS] [JSN]
R5-211163 WP UE Conformance Test Aspects - Even further enhanced MTC for LTE Work Plan Ericsson LTE_eMTC4-UEConTest R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211164 SR UE Conformance Test Aspects - Even further enhanced MTC for LTE WI status report Ericsson LTE_eMTC4-UEConTest R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211165 Introduction of support for URLLC CR

revised to R5-211498

Ericsson 38.508-1 16.6.0 CR#1781 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

revised [WTS] [JSN]
R5-211166 Addition of QoS for URLLC CR

revised to R5-211499

Ericsson 38.508-1 16.6.0 CR#1782 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

revised [WTS] [JSN]
R5-211167 Updates to REGISTRATION ACCEPT message CR Ericsson 38.508-1 16.6.0 CR#1783 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-211168 Updates to PDU SESSION ESTABLISHMENT ACCEPT message CR Ericsson 38.508-1 16.6.0 CR#1784 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-211169 Addition of URSP details CR

revised to R5-211357

Ericsson 38.508-1 16.6.0 CR#1785 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

revised [WTS] [JSN]
R5-211170 Editorial update to BandCombinationListSidelink IE CR Ericsson 38.508-1 16.6.0 CR#1786 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-211171 Update to RRCReconfiguration-Speech IE CR Ericsson 38.508-1 16.6.0 CR#1787 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.5

agreed [WTS] [JSN]
R5-211172 Editorial updates to RACH-ConfigCommon IE CR

revised to R5-211450

Ericsson 36.508 16.7.0 CR#1348 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 6.3.11.1

revised [WTS] [JSN]
R5-211173 Correction NR RRC idle mode test case 6.1.2.14 CR ANRITSU LTD, Qualcomm 38.523-1 16.6.0 CR#2059 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211174 Addition of R17 new CBWs into 38.521-1 clause 5 CR China Unicom, Huawei, HiSilicon 38.521-1 16.6.0 CR#1190 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.3.3

agreed [WTS] [JSN]
R5-211175 FR2 Minimum output power measurement uncertainty update CR Keysight Technologies UK Ltd 38.903 16.6.0 CR#216 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211176 Reference to measurement BW corrected in 6.5D.4 TX intermodulation test case CR Keysight Technologies UK Ltd 38.521-1 16.6.0 CR#1191 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-211177 Correction of Table 4.1-1 CR

revised to R5-211803

Google Inc. 36.521-2 16.7.0 CR#955 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 5.3.13.3

revised [WTS] [JSN]
R5-211178 Updating test frequencies for Rel-17 inter-band EN-DC configurations for band n1 CR DOCOMO Communications Lab. 38.508-1 16.6.0 CR#1788 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.1

withdrawn [WTS] [JSN]
R5-211179 On Additional Spurious emissions discussion

revised to R5-211948

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211180 Correction of Table A.4.3-3d CR

revised to R5-211846

Google Inc. 36.521-2 16.7.0 CR#956 catF TEI12_Test Rel-16 R5-90-e

AI: 5.5.1.3

revised [WTS] [JSN]
R5-211181 PC1 and PC3 Updates for Band n14 CR

revised to R5-211657

AT&T 38.521-1 16.6.0 CR#1192 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

revised [WTS] [JSN]
R5-211182 Addition of PICS powerBoosting-pi2BPSK CR

revised to R5-211862

Google Inc. 38.508-2 16.6.0 CR#165 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

revised [WTS] [JSN]
R5-211183 Correction PICS condition of test case 6.4.2.5 CR

revised to R5-211721

Google Inc. 38.522 16.6.0 CR#62 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

revised [WTS] [JSN]
R5-211184 On ETC MUs discussion Keysight Technologies UK Ltd, Rohde & Schwarz 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211185 CR to 38.903 on ETC Testing CR

revised to R5-211935

Keysight Technologies UK Ltd 38.903 16.6.0 CR#217 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-211186 On Larger Quiet Zone Sizes with Grey Box discussion

revised to R5-211949

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211187 CR to 38.508-1 on larger quiet zone with grey box approach CR Keysight Technologies UK Ltd 38.508-1 16.6.0 CR#1789 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

withdrawn [WTS] [JSN]
R5-211188 CR to 38.521-2 on larger quiet zone with grey box approach CR Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#489 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

withdrawn [WTS] [JSN]
R5-211189 PC1 MUs based on the revised antenna array assumptions discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211190 CR to 38.521-2 on PC1 Measurement Grid MUs CR

revised to R5-211924

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#490 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

revised [WTS] [JSN]
R5-211191 CR to 38.903 on PC1 Measurement Grid MUs CR Keysight Technologies UK Ltd 38.903 16.6.0 CR#218 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211192 On n259 QoQZ and XPD MU discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211193 On the MU Element “Uncertainty of an absolute gain of the calibration antenna” for n259 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211194 On Declaration of Antenna Aperture for DFF based RRM systems discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211195 CR to 38.508-2 on Antenna Aperture Declarations CR Keysight Technologies UK Ltd 38.508-2 16.6.0 CR#166 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

withdrawn [WTS] [JSN]
R5-211196 Updating UE capability for Rel-17 NR CA configuration CR DOCOMO Communications Lab. 38.508-2 16.6.0 CR#167 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.2

withdrawn [WTS] [JSN]
R5-211197 SR UE Conformance Test Aspects- ENDC_UE_PC2_FDD_TDD after R5#90e WI status report China Unicom ENDC_UE_PC2_FDD_TDD-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211198 WP UE Conformance Test Aspects- ENDC_UE_PC2_FDD_TDD after R5#90e Work Plan China Unicom ENDC_UE_PC2_FDD_TDD-UEConTest Rel-16 R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211199 Specify CSI-SSB-ResourceSet for RRM CR

revised to R5-211668

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#1790 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

revised [WTS] [JSN]
R5-211200 Applicability for 5.4.3.1 CR ROHDE & SCHWARZ 38.522 16.6.0 CR#63 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

withdrawn [WTS] [JSN]
R5-211201 Applicability for FR2 iRAT CR ROHDE & SCHWARZ 38.522 16.6.0 CR#64 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

withdrawn [WTS] [JSN]
R5-211202 Applicability for 4.5.7.1 CR ROHDE & SCHWARZ 38.522 16.6.0 CR#65 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

withdrawn [WTS] [JSN]
R5-211203 Editorial for Table 6.6.2-10 Reference packet filter #9 CR

revised to R5-211506

NIST 36.508 16.7.0 CR#1349 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.1

revised [WTS] [JSN]
R5-211204 Editorial update IE BWP CR Ericsson 38.508-1 16.6.0 CR#1791 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-211205 Correction to Test Case 10.2.2 CR

revised to R5-211511

NIST 36.523-1 16.7.0 CR#5013 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.3.5

revised [WTS] [JSN]
R5-211206 FR1 Test Tolerance review training discussion

revised to R5-211654

Ericsson Rel-16 R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211207 FR2 Test Tolerance review training discussion

revised to R5-211655

Ericsson Rel-16 R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211208 Update of Test Tolerance analysis for FR1 event triggered reporting test cases CR

revised to R5-211649

Ericsson 38.903 16.6.0 CR#219 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-211209 Update of Test Tolerance analysis for FR1 SSB-based L1-RSRP test cases CR

revised to R5-211650

Ericsson 38.903 16.6.0 CR#220 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-211210 Update of Test Tolerance analysis for FR1 CSI-RS based L1-RSRP test cases CR

revised to R5-211651

Ericsson 38.903 16.6.0 CR#221 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-211211 Correction of applied TT for EN-DC FR1 L1-RSRP measurement test cases CR

revised to R5-211621

Ericsson 38.533 16.6.0 CR#1117 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

revised [WTS] [JSN]
R5-211212 Correction of applied TT for SA FR1 L1-RSRP measurement test cases CR

revised to R5-211632

Ericsson 38.533 16.6.0 CR#1118 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

revised [WTS] [JSN]
R5-211213 Correction of EN-DC FR2 inter-freq measurement test case 5.6.2.1 including TT CR

revised to R5-211623

Ericsson 38.533 16.6.0 CR#1119 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

revised [WTS] [JSN]
R5-211214 Correction of EN-DC FR2 inter-freq measurement test case 5.6.2.3 including TT CR

revised to R5-211624

Ericsson 38.533 16.6.0 CR#1120 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

revised [WTS] [JSN]
R5-211215 Correction of SA FR2 inter-freq measurement test case 7.6.2.1 including TT CR

revised to R5-211633

Ericsson 38.533 16.6.0 CR#1121 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

revised [WTS] [JSN]
R5-211216 Correction of SA FR2 inter-freq measurement test case 7.6.2.3 including TT CR

revised to R5-211634

Ericsson 38.533 16.6.0 CR#1122 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

revised [WTS] [JSN]
R5-211217 Correction of MTSU and applied TT in Annex F CR

revised to R5-211640

Ericsson 38.533 16.6.0 CR#1123 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

revised [WTS] [JSN]
R5-211218 Addition of new RRM test cases to the applicability table in 4.2 CR

revised to R5-211917

Ericsson 38.522 16.6.0 CR#66 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.4

revised [WTS] [JSN]
R5-211219 Correction of the minimum conformance requirements for Inter-RAT measurements 6.6.3.0 CR Ericsson 38.533 16.6.0 CR#1124 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-211220 Addition of new RRM iRAT measurement Inter-RAT measurements test case 6.6.3.3 CR Ericsson 38.533 16.6.0 CR#1125 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-211221 Correction of the minimum conformance requirements for E-UTRA - NR FR1 Cell reselection 8.2.1.0 CR

revised to R5-211830

Ericsson 38.533 16.6.0 CR#1126 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

revised [WTS] [JSN]
R5-211222 Addition of new RRM E-UTRA - NR FR1 Cell reselection test case 8.2.1.2 CR

revised to R5-211831

Ericsson 38.533 16.6.0 CR#1127 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

revised [WTS] [JSN]
R5-211223 Correction of the minimum conformance requirements for E-UTRA - NR Inter-RAT event triggered reporting tests 8.4.2.0 CR

revised to R5-211832

Ericsson 38.533 16.6.0 CR#1128 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

revised [WTS] [JSN]
R5-211224 Addition of new RRM E-UTRA - NR Inter-RAT event triggered reporting test case 8.4.2.9 CR

revised to R5-211833

Ericsson 38.533 16.6.0 CR#1129 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

revised [WTS] [JSN]
R5-211225 Addition of new RMCs and OCNGs into Annex A CR

revised to R5-211641

Ericsson 38.533 16.6.0 CR#1130 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

revised [WTS] [JSN]
R5-211226 Updating UE capability for Rel-17 NR inter-band EN-DC configurations for band n1 CR DOCOMO Communications Lab. 38.508-2 16.6.0 CR#168 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.2

withdrawn [WTS] [JSN]
R5-211227 Discussion on PCC prioritization for FR1 and FR2 UL CA testing discussion

revised to R5-211941

Qualcomm Finland RFFE Oy 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211228 Test Point analysis update for FR2 Tx additional spurious emission test case CR

revised to R5-211748

Qualcomm Finland RFFE Oy 38.905 16.6.0 CR#388 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

revised [WTS] [JSN]
R5-211229 Add n26 to 2Rx capabilities declaration CR Dish Network 38.508-2 16.6.0 CR#169 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-211230 NS_12, NS_13, NS_14, NS_15 TP analysis to 38.905 CR Dish Network 38.905 16.6.0 CR#389 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.9

agreed [WTS] [JSN]
R5-211231 FR2 Tx additional spurious emission test case updates CR

revised to R5-211867

Qualcomm Finland RFFE Oy 38.521-2 16.6.0 CR#491 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211232 Quality of the Quiet Zone measurement results for 20cm QZ discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211233 Correction of test frequencies for NR band n48 CR

revised to R5-211785

Ericsson 38.508-1 16.6.0 CR#1792 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.1

revised [WTS] [JSN]
R5-211234 Update to NR RRC UE capability transfer test case 8.1.5.1.1 CR Qualcomm Incorporated 38.523-1 16.6.0 CR#2060 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

agreed [WTS] [JSN]
R5-211235 Discussion on the size of Quiet Zone above 30cm discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211236 Addition of band 7, 42, 43 and 65 for UE category M1 and NB1 to clause 5 CR

revised to R5-211834

Ericsson 36.521-1 16.7.0 CR#5271 catF LTE_bands_R16_M1_NB1-UEConTest Rel-16 R5-90-e

AI: 5.3.27.2

revised [WTS] [JSN]
R5-211237 Addition of band 7, 42, 43 and 65 for UE category M1 and NB1 to clause 6 CR

revised to R5-211835

Ericsson 36.521-1 16.7.0 CR#5272 catF LTE_bands_R16_M1_NB1-UEConTest Rel-16 R5-90-e

AI: 5.3.27.2

revised [WTS] [JSN]
R5-211238 Addition of band 7, 42, 43 and 65 for UE category M1 and NB1 to clause 7.3 CR Ericsson 36.521-1 16.7.0 CR#5273 catF LTE_bands_R16_M1_NB1-UEConTest Rel-16 R5-90-e

AI: 5.3.27.2

withdrawn [WTS] [JSN]
R5-211239 Introduction of DC_1A-28A_n3A to reference sensitivity test CR

revised to R5-211905

Ericsson 38.521-3 16.6.0 CR#933 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

revised [WTS] [JSN]
R5-211240 Introduction of DC_7A-20A_n1A to reference sensitivity test CR Ericsson 38.521-3 16.6.0 CR#934 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

agreed [WTS] [JSN]
R5-211241 Introduction of DC_7A- 28A_n3A to referce sensitivity test CR Ericsson 38.521-3 16.6.0 CR#935 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

agreed [WTS] [JSN]
R5-211242 Reference sensitivity TP analysis for DC_1A-28A_n3A CR

revised to R5-211906

Ericsson 38.905 16.6.0 CR#390 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-211243 Reference sensitivity analysis for DC_3A-7A_n1A CR

revised to R5-211907

Ericsson 38.905 16.6.0 CR#391 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-211244 Reference sensitivity TP analysis for DC_7A-20A_n1A CR

revised to R5-211908

Ericsson 38.905 16.6.0 CR#392 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-211245 Reference sensitivity TP analysis for DC_7A-28A_n3A CR

revised to R5-211909

Ericsson 38.905 16.6.0 CR#393 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

revised [WTS] [JSN]
R5-211246 Update to MR-DC RRC UE capability transfer test case 8.2.1.1.1 CR Qualcomm Incorporated 38.523-1 16.6.0 CR#2061 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.1

agreed [WTS] [JSN]
R5-211247 Simplified Quality of the Quiet Zone procedure discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211248 Updating UE capability for Rel-16 NR inter-band CA configurations for band n1 CR

revised to R5-211904

DOCOMO Communications Lab. 38.508-2 16.6.0 CR#170 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.2

revised [WTS] [JSN]
R5-211249 Discussion paper to align DL CA Rx test cases discussion Dish Network NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.11

noted [WTS] [JSN]
R5-211250 Correction to MCVideo Test Case 6.1.1.9 CR

revised to R5-211546

NIST 36.579-6 14.0.0 CR#1 catF TEI14_Test, MCImp-UEConTest Rel-14 R5-90-e

AI: 6.6.9.6

revised [WTS] [JSN]
R5-211251 CR to 38.508-2 on larger quiet zone with grey box approach CR

revised to R5-211849

Keysight Technologies UK Ltd 38.508-2 16.6.0 CR#171 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

revised [WTS] [JSN]
R5-211252 Updating Rel-16 NR inter-band CA configuration for band n1 CR DOCOMO Communications Lab. 38.521-1 16.6.0 CR#1193 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.3

withdrawn [WTS] [JSN]
R5-211253 Updating Rel-17 NR inter-band EN-DC configurations for band n1 CR DOCOMO Communications Lab. 38.521-3 16.6.0 CR#936 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.5.3

withdrawn [WTS] [JSN]
R5-211254 Adding an MCPTT test case to the applicability table CR NIST 36.579-4 14.4.1 CR#13 catF TEI14_Test, MCImp-UEConTest Rel-14 R5-90-e

AI: 6.6.9.4

agreed [WTS] [JSN]
R5-211255 Clarification of BWP1 and BWP2 in 4.6.1.3, 4.6.1.4, 4.6.1.6 CR Keysight Technologies UK Ltd 38.533 16.6.0 CR#1131 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211256 Updating 6.2A.1.1 for CA_n1A-n79A CR DOCOMO Communications Lab. 38.521-1 16.6.0 CR#1194 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.1

withdrawn [WTS] [JSN]
R5-211257 Update for Band 48 in test case 6.2.2 CR ROHDE & SCHWARZ 36.521-1 16.7.0 CR#5274 catF TEI14_Test, LTE_TDD_3550_CBRS_US-UEConTest Rel-16 R5-90-e

AI: 5.5.1.2.1

agreed [WTS] [JSN]
R5-211258 Editorial Correction in test case 7.3A9 CR ROHDE & SCHWARZ 36.521-1 16.7.0 CR#5275 catF TEI13_Test, LTE_CA_Rel13-UEConTest Rel-16 R5-90-e

AI: 5.5.1.2.2

agreed [WTS] [JSN]
R5-211259 On the achievable SNR for demod test cases discussion

revised to R5-211950

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211260 Update of FR2 demod test cases CR

revised to R5-211929

ROHDE & SCHWARZ 38.521-4 16.6.0 CR#299 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.2

revised [WTS] [JSN]
R5-211261 Update of demod SNR testability CR

revised to R5-211936

ROHDE & SCHWARZ 38.903 16.6.0 CR#222 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-211262 On the QoQZ standard deviation for ETC testing discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

withdrawn [WTS] [JSN]
R5-211263 On the MU for n259 discussion

revised to R5-211656

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

revised [WTS] [JSN]
R5-211264 Update of QoQZ MU CR ROHDE & SCHWARZ 38.903 16.6.0 CR#223 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

withdrawn [WTS] [JSN]
R5-211265 Update of ETC MTSU CR

revised to R5-211925

ROHDE & SCHWARZ 38.521-2 16.6.0 CR#492 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

revised [WTS] [JSN]
R5-211266 On the MU of FR2 OBW discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211267 Update of Annex F for test case 7.3.4 CR

revised to R5-211693

ROHDE & SCHWARZ 38.521-2 16.6.0 CR#493 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

revised [WTS] [JSN]
R5-211268 On FR2 ON/OFF Time Mask discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211269 Correction to MCVideo Test Case 6.2.6 CR NIST 36.579-6 14.0.0 CR#2 catF TEI14_Test, MCImp-UEConTest Rel-14 R5-90-e

AI: 6.6.9.6

agreed [WTS] [JSN]
R5-211270 Updating 6.2B.1.3 for Rel-17 NR inter-band EN-DC configurations for band n1 CR DOCOMO Communications Lab. 38.521-3 16.6.0 CR#937 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.5.1

withdrawn [WTS] [JSN]
R5-211271 Editorial for correcting heading styles CR

revised to R5-211355

NIST 36.579-7 14.1.0 CR#3 catF TEI14_Test, MCImp-UEConTest Rel-14 R5-90-e

AI: 6.6.9.7

revised [WTS] [JSN]
R5-211272 Correction to clause 4.5.2 RRC_IDLE CR Qualcomm CDMA Technologies 38.508-1 16.6.0 CR#1793 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

withdrawn [WTS] [JSN]
R5-211273 Test Tolerance analysis for FR2 event triggered reporting test cases CR

revised to R5-211652

Ericsson 38.903 16.6.0 CR#224 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

revised [WTS] [JSN]
R5-211274 Updating 6.5A.3.2 for CA_n1A-n79A CR DOCOMO Communications Lab. 38.521-1 16.6.0 CR#1195 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.1

agreed [WTS] [JSN]
R5-211275 Measurement uncertainties for PC1 devices discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211276 FR2 Extreme testing conditions applicability discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211277 LS on inter-RAT cell reselection for mobility state estimation LS in

source LS: R2-2102311

TSG WG RAN2 NR_newRAT-Core Rel-15 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-211278 Reply LS on Rel-16 mandatory RRM requirements LS in

LS is reply to R2-2100060 (R4-2017803)

source LS: R2-2102338

TSG WG RAN2 NR_RRM_enh-Core Rel-16 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-211279 LS to RAN5 on RRC processing time with segmentation LS in

source LS: R2-2102488

TSG WG RAN2 NR_newRAT-Core, TEI16 Rel-16 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-211280 Reply LS on reporting of SINR measurements for serving cell LS in

LS is reply to R5-206274(R2-2100063)

source LS: R2-2102499

TSG WG RAN2 NR_newRAT-Core Rel-15 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-211281 Correction to TC6.4.2.5 EVM equalizer spectrum flatness for Pi2 BPSK CR Bureau Veritas 38.521-1 16.6.0 CR#1196 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-211282 Agenda - opening session agenda

revision of R5-210000

WG Chairman R5-90-e

AI: 1

noted [WTS] [JSN]
R5-211283 Addition of UAI test function CR

revised to R5-211549

Qualcomm CDMA Technologies 38.509 15.9.0 CR#34 catB NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.3

revised [WTS] [JSN]
R5-211284 LS on change of methodology for new LTE-CA REL-17 combinations LS in

source LS: R4-2101818

TSG WG RAN4 LTE_CA_R17_2BDL_1BUL Rel-17 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-211285 LS on Signalling scheme of Transparent TxD LS in

source LS: R4-2103360

TSG WG RAN4 TEI16 Rel-16 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-211286 LS on Test Methodology for UE URLLC Ultra Low BLER CQI requirements LS in

source LS: R4-2103897

TSG WG RAN4 NR_L1enh_URLLC-Perf Rel-16 R5-90-e

AI: 3

noted [WTS] [JSN]
R5-211287 WP UE Conformance Test Aspects - Enhancing LTE CA Utilization Work Plan Nokia, Nokia Shanghai Bell LTE_euCA-UEConTest R5-90-e

AI: 7.4.2

noted [WTS] [JSN]
R5-211288 SR UE Conformance Test Aspects - Enhancing LTE CA Utilization WI status report Nokia, Nokia Shanghai Bell LTE_euCA-UEConTest R5-90-e

AI: 7.4.2

noted [WTS] [JSN]
R5-211289 WP UE Conformance Test Aspects - NR performance requirement enhancement Work Plan Qualcomm NR_perf_enh-UEConTest R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211290 SR UE Conformance Test Aspects - NR performance requirement enhancement WI status report Qualcomm NR_perf_enh-UEConTest R5-90-e

AI: 7.4.2

withdrawn [WTS] [JSN]
R5-211291 Introduction of MU and TT for CA Idle Mode Measurements CR

revised to R5-211758

Nokia, Nokia Shanghai Bell 36.521-3 16.7.0 CR#2573 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.3

revised [WTS] [JSN]
R5-211292 Introduction of CA Idle Mode Measurement RRM Testcase Applicabilities CR

revised to R5-211757

Nokia, Nokia Shanghai Bell 36.521-2 16.7.0 CR#957 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.2

revised [WTS] [JSN]
R5-211293 FDD Inter Frequency Absolute RSRP Accuracy CA Idle Mode Measurements for Non-Overlapping Carrier CR

revised to R5-211759

Nokia, Nokia Shanghai Bell 36.521-3 16.7.0 CR#2570 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.3

revised [WTS] [JSN]
R5-211294 FDD Inter Frequency Absolute RSRP Accuracy CA Idle Mode Measurements for Overlapping Carrier CR

revised to R5-211760

Nokia, Nokia Shanghai Bell 36.521-3 16.7.0 CR#2571 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.3

revised [WTS] [JSN]
R5-211295 FDD Intra Frequency Absolute RSRP Accuracy CA Idle Mode Measurements CR

revised to R5-211761

Nokia, Nokia Shanghai Bell 36.521-3 16.7.0 CR#2572 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.3

revised [WTS] [JSN]
R5-211296 Correction to test case 8.1.5.1.1 CR

revised to R5-211394

MediaTek Inc. 38.523-1 16.6.0 CR#2062 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

revised [WTS] [JSN]
R5-211297 Correction to test case 8.2.1.1.1 CR

revised to R5-211395

MediaTek Inc. 38.523-1 16.6.0 CR#2063 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.1

revised [WTS] [JSN]
R5-211298 Corrections for support of multiple GPS signals CR Spirent Communications 37.571-2 16.6.0 CR#142 catF TEI12_Test Rel-16 R5-90-e

AI: 6.6.7.1

agreed [WTS] [JSN]
R5-211299 Applicability of ‘Re-registration after capability update / 5GS’ test case CR Apple Inc. 34.229-2 15.5.0 CR#281 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.8

agreed [WTS] [JSN]
R5-211300 MCC TF160 Status Report report

revision of R5-210192

MCC TF160 R5-90-e

AI: 7.5

approved [WTS] [JSN]
R5-211301 Reply LS on NGMN-GTI 5G Smart Devices Supporting Network Slicing LS out

LS To: NGNM

TSG WG RAN5 R5-90-e

AI: 7.5

reserved [WTS] [JSN]
R5-211302 New WID on UE Conformance Test Aspects for NR RF Requirement Enhancements for FR2 WID new

revision of R5-210080

Nokia, Nokia Shanghai Bell Rel-16 R5-90-e

AI: 7.4.1

agreed [WTS] [JSN]
R5-211303 New WID on UE Conformance Test Aspects for Enhancement of Network Slicing WID new

revision of R5-210104

China Mobile, China Telecom, China Unicom Rel-16 R5-90-e

AI: 7.4.1

agreed [WTS] [JSN]
R5-211304 New WID on UE Conformance Test Aspects for 2-step RACH for NR WID new

revision of R5-210514

ZTE Corporation, China Telecom R5-90-e

AI: 7.4.1

agreed [WTS] [JSN]
R5-211305 New WID on UE Conformance Test Aspects – LTE-NR & NR-NR Dual Connectivity and NR CA enhancements WID new

revision of R5-210827

Nokia, Nokia Shanghai Bell R5-90-e

AI: 7.4.1

agreed [WTS] [JSN]
R5-211306 New WID on UE Conformance Test Aspects for NR-based Access to Unlicensed Spectrum WID new

revision of R5-211080

Qualcomm Wireless GmbH R5-90-e

AI: 7.4.1

agreed [WTS] [JSN]
R5-211307 New WID on UE Conformance Test Aspects – High power UE (power class 2) for EN-DC with 1 LTE band + 1 NR TDD band WID new

revision of R5-210774

China Unicom Rel-17 R5-90-e

AI: 7.4.1

agreed [WTS] [JSN]
R5-211308 New WID - UE Conformance Test Aspects - Support of eCall over IMS for NR WID new

revision of R5-211087

Qualcomm Incorporated Rel-16 R5-90-e

AI: 7.4.1

agreed [WTS] [JSN]
R5-211309 New SID: Study on on 5G NR UE supporting Network Slicing Testing SID new

revision of R5-210105

China Mobile, China Unicom Rel-16 R5-90-e

AI: 7.4.1

agreed [WTS] [JSN]
R5-211310 Discussion to add test cases for RRC DL segmentation discussion

revision of R5-210581

MediaTek Inc. Rel-16 R5-90-e

AI: 6.4.7

noted [WTS] [JSN]
R5-211311 LS on confirming successful resource reservation LS out

LS To: TSG WG CT1

TSG WG RAN5 R5-90-e

AI: 6.7

postponed [WTS] [JSN]
R5-211312 Correction to NR5GC RRC test case 8.1.1.2.4 CR Keysight Technologies UK 38.523-1 16.6.0 CR#2064 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.1

agreed [WTS] [JSN]
R5-211313 Addition of TC 7.1.1.3.11 - UL grant prioritization CR Huawei, Hisilicon 38.523-1 16.6.0 CR#2065 catF NR_IioT-UEConTest Rel-16 R5-90-e

AI: 6.3.14.3

agreed [WTS] [JSN]
R5-211314 Draft RAN5 Terms of Reference other

revision of R5-210021

revised to R5-211361

WG Chairman R5-90-e

AI: 4.5.3

revised [WTS] [JSN]
R5-211315 Update test case applicability for 6.2.3.9 CR

revision of R5-210578

MediaTek Inc. 38.523-2 16.6.0 CR#1221 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

withdrawn [WTS] [JSN]
R5-211316 Remove Idle Mode test case 6.2.3.9 CR

revised to R5-211381

MediaTek Inc. 38.523-1 16.6.0 CR#2066 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

revised [WTS] [JSN]
R5-211317 Proposal for introduction of a New Study Item on 5G NR UE supporting Network Slicing Testing discussion

revision of R5-210106

CMCC Rel-16 R5-90-e

AI: 4.5.3

noted [WTS] [JSN]
R5-211318 Correction to NR5GC UAC test case 11.3.7 CR

revised to R5-211410

Keysight Technologies UK, Qualcomm 38.523-1 16.6.0 CR#2067 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.3

revised [WTS] [JSN]
R5-211319 Correction to EPS FallBack test cases 11.1.X CR

revised to R5-211407

ANRITSU LTD, Qualcomm, Keysight 38.523-1 16.6.0 CR#2068 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.1

revised [WTS] [JSN]
R5-211320 Correction to Test frequencies for NB-IoT FDD MFBI CR

revised to R5-211507

ANRITSU LTD 36.508 16.7.0 CR#1350 catF TEI13_Test, NB_IOT-UEConTest Rel-16 R5-90-e

AI: 6.5.1

revised [WTS] [JSN]
R5-211321 Voiding 5GS Non-3GPP Access Test Case 9.2.5.2.1 CR ZTE Corporation 38.523-1 16.6.0 CR#2069 catF TEI15_Test, 5GS_Ph1-CT_n3GPPA-UEConTest Rel-16 R5-90-e

AI: 6.4.4.6

agreed [WTS] [JSN]
R5-211322 Testing Early implementation of Rel-14 NB-IoT Features “Category NB2”, and “twoHARQ-Processes-r14” discussion ROHDE & SCHWARZ, Nordic Semiconductor, Verizon, Telstra R5-90-e

AI: 6.5.6

noted [WTS] [JSN]
R5-211323 MR-DC discussion

revision of R5-210167

Ericsson R5-90-e

AI: 6.3.2.

noted [WTS] [JSN]
R5-211324 Discussion paper for RRC Segmentation in Rel-16 RACS discussion

revision of R5-210277

Qualcomm CDMA Technologies RACS-UEConTest Rel-16 R5-90-e

AI: 6.3.20.

noted [WTS] [JSN]
R5-211325 Title: Discussion paper on IMS 180 Ringing before or after resource reservation discussion Huawei, Hisilicon R5-90-e

AI: 6.3.2.

noted [WTS] [JSN]
R5-211327 Remove applicability of 5GS Non-3GPP Access Test Case 9.2.5.2.1 CR ZTE Corporation 38.523-2 16.6.0 CR#130 catF TEI15_Test, 5GS_Ph1-CT_n3GPPA-UEConTest Rel-16 R5-90-e

AI: 6.4.5

agreed [WTS] [JSN]
R5-211328 Correction to frequency parameters for band n53 CR Keysight Technologies UK, Nokia 38.508-1 16.6.0 CR#1796 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-211329 Correction to test case 6.1.1.3 CR

revision of R5-210574

MediaTek Inc. 38.523-1 16.6.0 CR#19931 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211330 Correction to test case 6.1.2.8 CR

revision of R5-210576

MediaTek Inc. 38.523-1 16.6.0 CR#19951 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211331 Correction to test case 6.4.1.2 CR

revision of R5-210577

MediaTek Inc. 38.523-1 16.6.0 CR#19961 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211332 Correction of NR RRC test case 8.1.4.1.5 CR

revision of R5-210067

Keysight Technologies UK 38.523-1 16.6.0 CR#19351 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.4

agreed [WTS] [JSN]
R5-211333 Removing test case 9.1.5.2.9 CR

revision of R5-210572

MediaTek Inc. 38.523-1 16.6.0 CR#19921 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.3

agreed [WTS] [JSN]
R5-211334 Addition of IMS over 5GS test case 7.25 CR

revision of R5-210072

ROHDE & SCHWARZ 34.229-5 15.2.1 CR#721 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211335 Correction of NR SL IE SL-BWP-PoolConfigCommon CR

revision of R5-210702

Huawei, Hisilicon 38.508-1 16.6.0 CR#17271 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-211336 Correction of NR SL IE SL-SDAP-Config CR

revision of R5-210712

Huawei, Hisilicon 38.508-1 16.6.0 CR#17371 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-211337 Correction to PC5-RRC message RRCReconfigurationSidelink CR

revision of R5-210715

Huawei, Hisilicon 38.508-1 16.6.0 CR#17401 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-211338 Correction to PC5-RRC message UECapabilityEnquirySidelink CR

revision of R5-210716

Huawei, Hisilicon 38.508-1 16.6.0 CR#17411 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-211339 Correction to PC5-RRC message UECapabilityInformationSidelink CR

revision of R5-210717

Huawei, Hisilicon 38.508-1 16.6.0 CR#17421 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-211340 Addition of support for BDS B1C signal CR

revision of R5-210053

Spirent Communications, CATT, CAICT 37.571-5 16.3.0 CR#2051 catF B1C_BDS_pos_UEConTest Rel-16 R5-90-e

AI: 6.3.23.4

agreed [WTS] [JSN]
R5-211341 Editorial updates of TS 36.523-1 Section 6 CR

revision of R5-210142

Samsung 36.523-1 16.7.0 CR#49951 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.1

agreed [WTS] [JSN]
R5-211342 Correction to LTE TC 6.1.1.6a CR

revision of R5-210682

Huawei, Hisilicon, MCC TF160 36.523-1 16.7.0 CR#50071 catF TEI8_Test Rel-16 R5-90-e

AI: 6.5.3.1

agreed [WTS] [JSN]
R5-211343 Editorial updates of TS 36.523-1 Section 7.1 CR

revision of R5-210143

Samsung 36.523-1 16.7.0 CR#49961 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.2.1

agreed [WTS] [JSN]
R5-211344 Editorial updates of TS 36.523-1 Sections 8.1 and 8.2 CR

revision of R5-210144

Samsung 36.523-1 16.7.0 CR#49971 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.3.1

agreed [WTS] [JSN]
R5-211345 Correction to LTE test case 8.2.4.1 for CAT-M mode UEs CR

revision of R5-211023

ROHDE & SCHWARZ 36.523-1 16.7.0 CR#50111 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.2

agreed [WTS] [JSN]
R5-211346 Editorial updates of TS 36.523-1 Section 8.3 CR

revision of R5-210145

Samsung 36.523-1 16.7.0 CR#49981 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.3.3

agreed [WTS] [JSN]
R5-211347 Editorial updates of TS 36.523-1 Section 8.4 CR

revision of R5-210146

Samsung 36.523-1 16.7.0 CR#49991 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.3.4

agreed [WTS] [JSN]
R5-211348 Editorial updates of TS 36.523-1 Section 9 CR

revision of R5-210147

Samsung 36.523-1 16.7.0 CR#50001 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.4

agreed [WTS] [JSN]
R5-211349 Editorial updates of TS 36.523-1 Sections 10 to 13 CR

revision of R5-210148

Samsung 36.523-1 16.7.0 CR#50011 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.5

agreed [WTS] [JSN]
R5-211350 Editorial updates of TS 36.523-1 Sections 15, 17 and 19 CR

revision of R5-210149

Samsung 36.523-1 16.7.0 CR#50021 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.11

agreed [WTS] [JSN]
R5-211351 Aligning content of 36.523-2 with 36.523-1 CR

revision of R5-210151

Samsung 36.523-2 16.7.0 CR#13331 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.4

agreed [WTS] [JSN]
R5-211352 Adding applicability for TC 13.1.22 MCPTT / Attach / Call setup CO CR

revision of R5-210154

Samsung 36.523-2 16.7.0 CR#13351 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.4

agreed [WTS] [JSN]
R5-211353 Correction to annexure A.3.1 CR

revision of R5-210323

Keysight Technologies UK, MCC TF160, Qualcomm 34.229-1 15.6.0 CR#14561 catF TEI14_Test, EIEI-UEConTest Rel-15 R5-90-e

AI: 6.6.6.1

agreed [WTS] [JSN]
R5-211354 Update of References in 36.579-1 CR

revision of R5-211044

Samsung 36.579-1 15.0.0 CR#1211 catF TEI14_Test Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-211355 Editorial for correcting heading styles CR

revision of R5-211271

NIST 36.579-7 14.1.0 CR#31 catF TEI14_Test, MCImp-UEConTest Rel-14 R5-90-e

AI: 6.6.9.7

agreed [WTS] [JSN]
R5-211356 Adding applicability for E-UTRAN TC 8.2.4.30.1 DAPS handover CR

revised to R5-211453

China Telecom 36.523-2 16.7.0 CR#1338 catF LTE_feMob-UEConTest Rel-16 R5-90-e

AI: 6.3.13.3

revised [WTS] [JSN]
R5-211357 Addition of URSP details CR

revision of R5-211169

Ericsson 38.508-1 16.6.0 CR#17851 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

withdrawn [WTS] [JSN]
R5-211358 Adding new test cases of SCell Dormancy Indication for UE power saving in NR CR CATT 38.523-1 16.6.0 CR#2070 catF NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.4

agreed [WTS] [JSN]
R5-211359 LS on confirming IMS 180 Ringing before or after dedicated bearer establishment LS out

LS To: TSG WG CT1

TSG WG RAN5 R5-90-e

AI: 7.5

reserved [WTS] [JSN]
R5-211360 LS on ICE support for establishing an MCPTT pre-established session LS out

LS To: TSG WG CT1

TSG WG RAN5 Rel-14 R5-90-e

AI: 7.5

reserved [WTS] [JSN]
R5-211361 Draft RAN5 Terms of Reference other

revision of R5-211314

WG Chairman R5-90-e

AI: 7.2.3

approved [WTS] [JSN]
R5-211362 Discussion paper on impact of UE’s highest channel bandwidth capability on Transport Block Selection test cases discussion

revision of R5-211045

Qualcomm Incorporated 5GS_NR_LTE-UEConTest R5-90-e

AI: 6.3.2.

noted [WTS] [JSN]
R5-211363 Revised WID on UE Conformance Test Aspects for NR HST WID revised

revision of R5-210103

CMCC NR_HST-UEConTest Rel-16 R5-90-e

AI: 7.4.2

agreed [WTS] [JSN]
R5-211364 Revised WID - Rel-16 Optimisations on UE radio capability signalling – NR/E-UTRA WID revised

revision of R5-210278

Qualcomm CDMA Technologies RACS-UEConTest Rel-16 R5-90-e

AI: 7.4.2

agreed [WTS] [JSN]
R5-211365 Revised WID on UE Conformance Test Aspects for SON and MDT support for NR WID revised

revision of R5-210287

CMCC, Ericsson NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 7.4.2

agreed [WTS] [JSN]
R5-211366 WP UE Conformance Test Aspects - Rel -16 for CLI handling for NR Work Plan Qualcomm Technologies Netherlands B.V. R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211367 WP - 5G NR User Equipment (UE) Application Layer Data Throughput Performance Work Plan Qualcomm Technologies Netherlands B.V. R5-90-e

AI: 7.4.2

reserved [WTS] [JSN]
R5-211368 Correction to test cases 22.3.1.6a, 22.3.1.9 and 22.3.2.7 CR

revision of R5-210024

ROHDE & SCHWARZ, Nordic Semiconductor, Verizon, Telstra 36.523-2 16.7.0 CR#13311 catF TEI13_Test, NB_IOTenh-UEConTest Rel-16 R5-90-e

AI: 6.5.4

withdrawn [WTS] [JSN]
R5-211369 Corrections to generic test procedures for IMS CR

revision of R5-210055

ROHDE & SCHWARZ, Ericsson, MCC TF160 38.508-1 16.6.0 CR#16731 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

agreed [WTS] [JSN]
R5-211370 Correction to generic procedure for UE-requested PDU session modification after S1 to N1 change CR

revision of R5-210070

Keysight Technologies UK 38.508-1 16.6.0 CR#16761 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

agreed [WTS] [JSN]
R5-211371 Correction to test procedure 4.9.7 CR

revision of R5-210194

MCC TF160 38.508-1 16.6.0 CR#16801 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

agreed [WTS] [JSN]
R5-211372 Correction to RRC IDLE procedures CR

revision of R5-210402

Keysight Technologies UK, Qualcomm 38.508-1 16.6.0 CR#16981 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

agreed [WTS] [JSN]
R5-211373 Addition of procedure for clearing Ues Last Registered PLMN CR

revision of R5-211038

Qualcomm Incorporated 38.508-1 16.6.0 CR#17621 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.1

withdrawn [WTS] [JSN]
R5-211374 Update IE PDCCH-ConfigCommon CR

revision of R5-210611

Ericsson, MCC TF160, Anritsu 38.508-1 16.6.0 CR#17121 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

agreed [WTS] [JSN]
R5-211375 Correction to Table 4.6.3-185 SSB-MTC CR

revision of R5-210624

Huawei, Hisilicon, Ericsson 38.508-1 16.6.0 CR#17151 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.1.2

agreed [WTS] [JSN]
R5-211376 Addition and update of PICS CR

revision of R5-210393

Lenovo, Motorola Mobility, Qualcomm 38.508-2 16.6.0 CR#1471 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.2

agreed [WTS] [JSN]
R5-211377 Editorial changes to 38.523-1 Section 6 CR

revision of R5-210157

Samsung 38.523-1 16.6.0 CR#19421 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211378 Correction to NR5G Idle mode TCs CR

revision of R5-210363

Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#19681 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211379 Correction to NR TC 6.3.1.1-SoR security check successful CR

revision of R5-210633

Huawei, Hisilicon 38.523-1 16.6.0 CR#20071 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211380 Correction to NR TC 6.3.1.2-SoR ACK has NOT requested CR

revision of R5-210634

Huawei, Hisilicon 38.523-1 16.6.0 CR#20081 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211381 Remove Idle Mode test case 6.2.3.9 CR

revision of R5-211316

MediaTek Inc. 38.523-1 16.6.0 CR#20661 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.2

agreed [WTS] [JSN]
R5-211382 Correction to NR MAC test case 7.1.1.8.1 CR

revision of R5-210063

Keysight Technologies UK 38.523-1 16.6.0 CR#19311 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-211383 Editorial changes to 38.523-1 Section 7 CR

revision of R5-210158

Samsung 38.523-1 16.6.0 CR#19431 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-211384 Correction to NR TC 7.1.1.2.2-PDSCH Aggregate CR

revision of R5-210638

Huawei, Hisilicon, MCC TF160 38.523-1 16.6.0 CR#20121 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-211385 Correction to NR TC 7.1.1.3.8.X-PHR report CR

revision of R5-210639

Huawei, Hisilicon 38.523-1 16.6.0 CR#20131 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.2

agreed [WTS] [JSN]
R5-211386 Correction to NR TC 7.1.2.3.3 and 7.1.2.3.4-RLC SN sequence CR

revision of R5-210640

Huawei, Hisilicon, Qualcomm CDMA Technologies, MCC TF160 38.523-1 16.6.0 CR#20141 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.3

agreed [WTS] [JSN]
R5-211387 Correction to NR TC 7.1.3.1.1 and 7.1.3.1.2-PDCP SN sequence CR

revision of R5-210641

Huawei, Hisilicon, Qualcomm CDMA Technologies, MCC TF160 38.523-1 16.6.0 CR#20151 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.3.1.4

agreed [WTS] [JSN]
R5-211388 Update to NR RRC test case 8.1.1.3.2 CR

revision of R5-211009

Qualcomm Incorporated 38.523-1 16.6.0 CR#20541 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.1

agreed [WTS] [JSN]
R5-211389 Correction to NR5G TCs 8.1.X on SINR reporting CR

revision of R5-210362

Qualcomm CDMA Technologies, Mediatek 38.523-1 16.6.0 CR#19671 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

agreed [WTS] [JSN]
R5-211390 Correction to NR test case 8.1.3.1.13-CSI-RS based intra-freq measure CR

revision of R5-210642

Huawei, Hisilicon 38.523-1 16.6.0 CR#20161 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.3

agreed [WTS] [JSN]
R5-211391 Correction of NR CA TC 8.1.4.1.9.x CR

revision of R5-210132

MediaTek Inc., Keysight Technologies 38.523-1 16.6.0 CR#19401 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.4

agreed [WTS] [JSN]
R5-211392 Correction to NR TC 8.1.5.8.1-Latency check CR

revision of R5-210646

Huawei, Hisilicon, MCC TF160, Qualcomm 38.523-1 16.6.0 CR#20201 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

agreed [WTS] [JSN]
R5-211393 Addition of NR TC 8.1.5.8.2.1-intra-band SCell Latency check CR

revision of R5-210647

Huawei, Hisilicon, MCC TF160 38.523-1 16.6.0 CR#20211 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

agreed [WTS] [JSN]
R5-211394 Correction to test case 8.1.5.1.1 CR

revision of R5-211296

MediaTek Inc. 38.523-1 16.6.0 CR#20621 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.1.5

agreed [WTS] [JSN]
R5-211395 Correction to test case 8.2.1.1.1 CR

revision of R5-211297

MediaTek Inc. 38.523-1 16.6.0 CR#20631 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.1

agreed [WTS] [JSN]
R5-211396 Correction to MR-DC test case 8.2.3.7.1 CR

revision of R5-210391

Guangdong OPPO Mobile Telecom. 38.523-1 16.6.0 CR#19791 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

agreed [WTS] [JSN]
R5-211397 Correction to NR-DC RRC test case 8.2.3.14.2 CR

revision of R5-210620

TDIA, CATT 38.523-1 16.6.0 CR#20001 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.3

agreed [WTS] [JSN]
R5-211398 Addition of NR-DC RRC TC 8.2.5.3.2 CR

revision of R5-210265

Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#19531 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.5

agreed [WTS] [JSN]
R5-211399 Addition of NR-DC RRC TC 8.2.5.4.2 CR

revision of R5-210266

Qualcomm CDMA Technologies 38.523-1 16.6.0 CR#19541 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.5

agreed [WTS] [JSN]
R5-211400 Correction to NR-DC RRC TC 8.2.5.1.2 CR

revision of R5-210365

Qualcomm CDMA Technologies, TDIA, CATT 38.523-1 16.6.0 CR#19701 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.5

agreed [WTS] [JSN]
R5-211401 Correction to NR-DC TC 8.2.6.1.2.1-RLC failure CR

revision of R5-210653

Huawei, Hisilicon 38.523-1 16.6.0 CR#20271 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.4.2.6

agreed [WTS] [JSN]
R5-211402 Addition of new 5GS NAS test case to test handling of extended octets CR

revision of R5-210026

NTT DOCOMO INC. 38.523-1 16.6.0 CR#19141 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.3

agreed [WTS] [JSN]
R5-211403 Correction to NR TC 9.1.8.1-SMS CR

revision of R5-211007

Huawei, Hisilicon 38.523-1 16.6.0 CR#20531 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.5

agreed [WTS] [JSN]
R5-211404 Correction to 5GMM Inter-system mobility test case 9.3.1.2 CR

revision of R5-210794

Keysight Technologies UK 38.523-1 16.6.0 CR#20421 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.6

agreed [WTS] [JSN]
R5-211405 Update of Inter system mobility test case 9.3.1.1 CR

revision of R5-211019

Qualcomm Incorporated 38.523-1 16.6.0 CR#20551 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.5.6

agreed [WTS] [JSN]
R5-211406 Correction to NR TC 11.1.3-EPS Fallback with handover CR

revision of R5-210654

Huawei, Hisilicon 38.523-1 16.6.0 CR#20281 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.1

agreed [WTS] [JSN]
R5-211407 Correction to EPS FallBack test cases 11.1.X CR

revision of R5-211319

ANRITSU LTD, Qualcomm, Keysight 38.523-1 16.6.0 CR#20681 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.1

agreed [WTS] [JSN]
R5-211408 Correction to NR5G UAC TC 11.3.4 CR

revision of R5-210364

Qualcomm CDMA Technologies, Keysight 38.523-1 16.6.0 CR#19691 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.3

agreed [WTS] [JSN]
R5-211409 Update of UAC test case 11.3.6 CR

revision of R5-211025

Qualcomm Incorporated 38.523-1 16.6.0 CR#20571 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.3

agreed [WTS] [JSN]
R5-211410 Correction to NR5GC UAC test case 11.3.7 CR

revision of R5-211318

Keysight Technologies UK, Qualcomm 38.523-1 16.6.0 CR#20671 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.3

agreed [WTS] [JSN]
R5-211411 Correction to 11.4.2 and 11.4.3 CR

revision of R5-210388

MediaTek Inc. 38.523-1 16.6.0 CR#19761 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.4

agreed [WTS] [JSN]
R5-211412 Update release applicability of RRC TC 8.1.1.2.4 CR

revision of R5-210025

NTT DOCOMO INC. 38.523-2 16.6.0 CR#1091 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

agreed [WTS] [JSN]
R5-211413 Adding missing applicability for TC 6.1.2.7 and 8.1.5.2.2 CR

revision of R5-210162

Samsung 38.523-2 16.6.0 CR#1121 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

agreed [WTS] [JSN]
R5-211414 Adding applicability for new IMS emergency TC 11.4.11 CR

revision of R5-210166

Samsung 38.523-2 16.6.0 CR#1131 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

agreed [WTS] [JSN]
R5-211415 Update of 5G-NR test cases applicability CR

revision of R5-210190

Qualcomm Incorporated, Mediatek 38.523-2 16.6.0 CR#1151 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

agreed [WTS] [JSN]
R5-211416 Correction to NR TC applicability for 5GS CR

revision of R5-210655

Huawei, Hisilicon 38.523-2 16.6.0 CR#1231 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.5

agreed [WTS] [JSN]
R5-211417 5G Test Models updates CR

revision of R5-210199

MCC TF160 38.523-3 16.0.0 CR#15681 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.6

agreed [WTS] [JSN]
R5-211418 Adding NG.114 dependencies to Annex A.2.1 CR

revision of R5-210347

ROHDE & SCHWARZ 34.229-1 15.6.0 CR#14581 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.7

agreed [WTS] [JSN]
R5-211419 Addition of applicabilities for new IMS over 5GS test cases CR

revision of R5-210079

ROHDE & SCHWARZ 34.229-2 15.5.0 CR#2781 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.8

agreed [WTS] [JSN]
R5-211420 Corrections and extensions to applicability statements of IMS over 5GS test cases CR

revision of R5-210094

ROHDE & SCHWARZ 34.229-2 15.5.0 CR#2791 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.8

agreed [WTS] [JSN]
R5-211421 Addition of IMS over 5GS test case 7.27 CR

revision of R5-210118

ZTE Corporation 34.229-5 15.2.1 CR#741 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211422 Addition of IMS over 5GS test case 7.28 CR

revision of R5-210119

ZTE Corporation 34.229-5 15.2.1 CR#751 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211423 Addition of IMS over 5GS test case 7.29 CR

revision of R5-210120

ZTE Corporation 34.229-5 15.2.1 CR#761 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211424 Addition of IMS over 5GS test case 7.30 CR

revision of R5-210121

ZTE Corporation 34.229-5 15.2.1 CR#771 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211425 Addition of IMS over 5GS test case 7.31 CR

revision of R5-210122

ZTE Corporation 34.229-5 15.2.1 CR#781 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211426 Addition of IMS over 5GS test case 7.32 CR

revision of R5-210123

ZTE Corporation 34.229-5 15.2.1 CR#791 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211427 Addition of IMS over 5GS test case 7.33 CR

revision of R5-210124

ZTE Corporation 34.229-5 15.2.1 CR#801 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211428 Addition of IMS over 5GS test case 7.34 CR

revision of R5-210125

ZTE Corporation 34.229-5 15.2.1 CR#811 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211429 Update test case 7.4, 7.5, 7.6 and 7.7 CR

revision of R5-210189

ZTE Corporation 34.229-5 15.2.1 CR#831 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211430 Editorial corrections to TS 34.229-5 CR

revision of R5-210357

ROHDE & SCHWARZ 34.229-5 15.2.1 CR#921 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211431 Addition of IMS over 5GS TC 7.14 CR

revision of R5-210369

Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#941 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211432 Adding references CR

revision of R5-210554

ROHDE & SCHWARZ 34.229-5 15.2.1 CR#951 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211433 Addition of A.15.1 MTSI MO Video Call / with preconditions / 5GS CR

revision of R5-210582

Qualcomm CDMA Technologies 34.229-5 15.2.1 CR#961 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211434 Correction to IMS over 5GS TC 7.2 CR

revision of R5-210591

Qualcomm CDMA Technologies, Anritsu, MCC TF160 34.229-5 15.2.1 CR#991 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211435 Correction to IMS over 5GS TC 7.11 CR

revision of R5-210592

Qualcomm CDMA Technologies, Keysight Technologies, Anritsu 34.229-5 15.2.1 CR#1001 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211436 Correction to NR IMS TC 7.10-Content Type not present CR

revision of R5-210657

Huawei, Hisilicon 34.229-5 15.2.1 CR#1021 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211437 Correction to NR IMS A.9.2-Optional UPDATE after EPS fallback CR

revision of R5-210658

Huawei, Hisilicon 34.229-5 15.2.1 CR#1031 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211438 Correction to NR IMS TC 10.1-Conformance requirement update CR

revision of R5-210660

Huawei, Hisilicon 34.229-5 15.2.1 CR#1051 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211439 Addition of NR IMS TC 7.26-MO CAT forking model CR

revision of R5-210661

Huawei, Hisilicon 34.229-5 15.2.1 CR#1061 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211440 Addition of NR IMS TC 8.26-MO hold without announcement CR

revision of R5-210662

Huawei, Hisilicon 34.229-5 15.2.1 CR#1071 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211441 Addition of NR IMS TC 8.28-MT hold without announcement CR

revision of R5-210663

Huawei, Hisilicon 34.229-5 15.2.1 CR#1081 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211442 Addition of NR IMS TC 8.30-Subscription to MWI event CR

revision of R5-210664

Huawei, Hisilicon 34.229-5 15.2.1 CR#1091 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211443 Addition of NR IMS TC 8.31-Creating and leaving conference CR

revision of R5-210665

Huawei, Hisilicon 34.229-5 15.2.1 CR#1101 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211444 Addition of NR IMS TC 8.32-Inviting user to conference by REFER CR

revision of R5-210666

Huawei, Hisilicon 34.229-5 15.2.1 CR#1111 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211445 Addition of NR IMS TC 8.34-Three way session CR

revision of R5-210667

Huawei, Hisilicon 34.229-5 15.2.1 CR#1121 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211446 Addition of NR IMS TC 8.36-MO explicit communication transfer CR

revision of R5-210668

Huawei, Hisilicon 34.229-5 15.2.1 CR#1131 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211447 Addition of new IMS over 5GS TC 8.38 Communication Waiting and cancelling the call / 5GS CR

revision of R5-211043

Qualcomm Incorporated 34.229-5 15.2.1 CR#1151 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 6.3.2.

agreed [WTS] [JSN]
R5-211448 Adding missing applicability for TC 8.2.2.14.1 CR

revision of R5-210152

Samsung 36.523-2 16.7.0 CR#13341 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 6.3.6.3

agreed [WTS] [JSN]
R5-211449 Correction of Table A.4.3.2B.2.3.12-1 CR

revision of R5-211128

Google Inc. 38.508-2 16.6.0 CR#1641 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 6.3.7.2

agreed [WTS] [JSN]
R5-211450 Editorial updates to RACH-ConfigCommon IE CR

revision of R5-211172

Ericsson 36.508 16.7.0 CR#13481 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 6.3.11.1

agreed [WTS] [JSN]
R5-211451 Completion C384 and C385 of Table 4-1a CR

revision of R5-211130

Google Inc. 36.523-2 16.7.0 CR#13371 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 6.3.11.4

agreed [WTS] [JSN]
R5-211452 Addition of E-UTRAN TC 8.2.4.30.1 DAPS handover CR

revision of R5-211162

China Telecom 36.523-1 16.7.0 CR#50121 catF LTE_feMob-UEConTest Rel-16 R5-90-e

AI: 6.3.13.2

agreed [WTS] [JSN]
R5-211453 Adding applicability for E-UTRAN TC 8.2.4.30.1 DAPS handover CR

revision of R5-211356

China Telecom 36.523-2 16.7.0 CR#13381 catF LTE_feMob-UEConTest Rel-16 R5-90-e

AI: 6.3.13.3

agreed [WTS] [JSN]
R5-211454 Corrections to DL Multi SPS test case CR

revision of R5-210769

Lenovo, Motorola Mobility, MCC TF160 38.523-1 16.6.0 CR#20411 catF NR_IioT-UEConTest Rel-16 R5-90-e

AI: 6.3.14.3

agreed [WTS] [JSN]
R5-211455 Correction to NR TC applicability for IIoT CR

revision of R5-210670

Huawei, Hisilicon 38.523-2 16.6.0 CR#1241 catF NR_IioT-UEConTest Rel-16 R5-90-e

AI: 6.3.14.4

agreed [WTS] [JSN]
R5-211456 Correction to Table 4.6.3-142 ReportConfigNR CR

revision of R5-210690

Huawei, Hisilicon 38.508-1 16.6.0 CR#17221 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.1

agreed [WTS] [JSN]
R5-211457 Add UE capability for NR MobEnc CR

revision of R5-210695

Huawei, Hisilicon 38.508-2 16.6.0 CR#1541 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.2

agreed [WTS] [JSN]
R5-211458 Addition of NR TC 8.1.4.4.1-Conditional handover Success CR

revision of R5-210691

Huawei, Hisilicon 38.523-1 16.6.0 CR#20381 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-211459 Addition of NR TC 8.1.4.4.2 -Conditional handover modify conditional handover configuration CR

revision of R5-210692

Huawei, Hisilicon 38.523-1 16.6.0 CR#20391 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-211460 Addition of NR TC 8.1.4.4.3-Conditional handover Failure CR

revision of R5-210693

Huawei, Hisilicon 38.523-1 16.6.0 CR#20401 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-211461 Correction to applicability for NR MobEnc CR

revision of R5-210694

Huawei, Hisilicon 38.523-2 16.6.0 CR#1271 catF NR_Mob_enh-UEConTest Rel-16 R5-90-e

AI: 6.3.15.4

agreed [WTS] [JSN]
R5-211462 Addition of SI combination for NR SL CR

revision of R5-210700

Huawei, Hisilicon 38.508-1 16.6.0 CR#17251 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 6.3.16.1

agreed [WTS] [JSN]
R5-211463 Adding scell dormancy indication outside active time to physical layer baseline implementation capabilities CR

revision of R5-210331

CATT 38.508-2 16.6.0 CR#1441 catF NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.2

agreed [WTS] [JSN]
R5-211464 Addition of test applicabilities for UE power saving in NR CR

revision of R5-210332

CATT 38.523-2 16.6.0 CR#1171 catF NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.5

agreed [WTS] [JSN]
R5-211465 Updates to SIB1 and SIB10 for Rel-16 NPN CR

revision of R5-210371

Qualcomm CDMA Technologies 38.508-1 16.6.0 CR#16931 catF NG_RAN_PRN_Vertical_LAN-UEConTest Rel-16 R5-90-e

AI: 6.3.19.1

agreed [WTS] [JSN]
R5-211466 Addition of System information combination for Rel-16 NPN CR

revision of R5-210373

Qualcomm CDMA Technologies 38.508-1 16.6.0 CR#16941 catF NG_RAN_PRN_Vertical_LAN-UEConTest Rel-16 R5-90-e

AI: 6.3.19.1

agreed [WTS] [JSN]
R5-211467 Introduction of definition of common environment for R16 NR Immediate MDT CR

revision of R5-210288

CMCC, ZTE 38.508-1 16.6.0 CR#16841 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.1

agreed [WTS] [JSN]
R5-211468 Updating Contents of RRC messages for Logged MDT test cases CR

revision of R5-210314

ZTE Corporation, CMCC 38.508-1 16.6.0 CR#16851 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.1

agreed [WTS] [JSN]
R5-211469 Introduction of common implementation conformance statements for R16 NR SON and MDT CR

revision of R5-210289

CMCC, ZTE, MediaTek Inc, HiSilicon 38.508-2 16.6.0 CR#1431 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.2

agreed [WTS] [JSN]
R5-211470 Addition of new MDT test case 8.1.6.1.2.1 CR

revision of R5-210029

ZTE, SRTC, Tejet 38.523-1 16.6.0 CR#19171 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211471 Addition of new MDT test case 8.1.6.1.2.2 CR

revision of R5-210030

ZTE, SRTC, Tejet 38.523-1 16.6.0 CR#19181 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211472 Addition of new MDT test case 8.1.6.1.2.3 CR

revision of R5-210031

ZTE, SRTC, Tejet 38.523-1 16.6.0 CR#19191 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211473 Addition of new MDT test case 8.1.6.1.2.7 CR

revision of R5-210035

ZTE Corporation 38.523-1 16.6.0 CR#19231 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211474 Addition of new MDT test case 8.1.6.1.2.8 CR

revision of R5-210036

ZTE Corporation 38.523-1 16.6.0 CR#19241 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211475 Addition of new MDT test case 8.1.6.1.2.12 CR

revision of R5-210040

ZTE Corporation 38.523-1 16.6.0 CR#19281 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211476 Addition of new MDT test case 8.1.6.1.2.13 CR

revision of R5-210041

ZTE Corporation 38.523-1 16.6.0 CR#19291 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211477 Addition of new test case 8.1.6.1.1.1 for NR Immediate MDT CR

revision of R5-210128

CMCC 38.523-1 16.6.0 CR#19371 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211478 Addition of new test case 8.1.6.1.1.2 for NR L2 measurement CR

revision of R5-210129

CMCC 38.523-1 16.6.0 CR#19381 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211479 Addition of MDT TC 8.1.6.1.4.3-CEF-intra-NR handover CR

revision of R5-210671

Huawei, Hisilicon 38.523-1 16.6.0 CR#20301 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211480 Addition of MDT TC 8.1.6.1.4.4-CEF-RRC re-establishment CR

revision of R5-210672

Huawei, Hisilicon 38.523-1 16.6.0 CR#20311 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211481 Addition of MDT TC 8.1.6.1.4.5-CEF-location info CR

revision of R5-210673

Huawei, Hisilicon 38.523-1 16.6.0 CR#20321 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211482 Addition of MDT TC 8.1.6.1.4.6-CEF-intra-freq measurements CR

revision of R5-210674

Huawei, Hisilicon 38.523-1 16.6.0 CR#20331 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211483 Addition of MDT TC 8.1.6.1.4.7-CEF-inter-freq measurements CR

revision of R5-210675

Huawei, Hisilicon 38.523-1 16.6.0 CR#20341 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211484 Addition of MDT TC 8.1.6.1.4.8-CEF-rach failure CR

revision of R5-210676

Huawei, Hisilicon 38.523-1 16.6.0 CR#20351 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211485 Addition of new MDT TC 8.1.6.1.3.1 CR

revision of R5-210798

MediaTek Inc., Tejet, SRTC 38.523-1 16.6.0 CR#20431 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211486 Addition of new MDT TC 8.1.6.1.3.3 CR

revision of R5-210800

MediaTek Inc., Tejet, SRTC 38.523-1 16.6.0 CR#20451 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.3

agreed [WTS] [JSN]
R5-211487 Applicability statement for new test cases for NR Immediate MDT CR

revision of R5-210130

CMCC 38.523-2 16.6.0 CR#1101 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.4

agreed [WTS] [JSN]
R5-211488 Adding applicability for new logged MDT test cases CR

revision of R5-210315

ZTE Corporation, CMCC 38.523-2 16.6.0 CR#1161 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.4

agreed [WTS] [JSN]
R5-211489 Correction to NR TC applicability for MDT CR

revision of R5-210677

Huawei, Hisilicon 38.523-2 16.6.0 CR#1251 catF NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.4

agreed [WTS] [JSN]
R5-211490 Update UE Positioning test mode procedures and UE Positioning messages draftCR

revision of R5-210316

ZTE Corporation NR_SON_MDT-UEConTest Rel-16 R5-90-e

AI: 6.3.22.6

endorsed [WTS] [JSN]
R5-211491 Addition of Cell configurations for 5G-SRVCC from NG-RAN to UTRAN CR

revision of R5-210421

CATT, TDIA 38.508-1 16.6.0 CR#17001 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.1

agreed [WTS] [JSN]
R5-211492 Introduciton of general capability for NR to UTRA-FDD CELL_DCH CS handover CR

revision of R5-210622

CATT, TDIA 38.508-2 16.6.0 CR#1531 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.2

agreed [WTS] [JSN]
R5-211493 Addition of a new test case for 5G-SRVCC from NG-RAN to 3GPP UTRAN CR

revision of R5-210412

CATT, TDIA 38.523-1 16.6.0 CR#19841 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.3

agreed [WTS] [JSN]
R5-211494 Addition of 5G SRVCC TC 8.1.3.2.6-NR to UMTS Inter-RAT measurements-Event B1 CR

revision of R5-210678

Huawei, Hisilicon 38.523-1 16.6.0 CR#20361 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.3

agreed [WTS] [JSN]
R5-211495 Addition of 5G SRVCC TC 8.1.3.2.7-NR to UMTS Inter-RAT measurements-Event B2 CR

revision of R5-210679

Huawei, Hisilicon 38.523-1 16.6.0 CR#20371 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.3

agreed [WTS] [JSN]
R5-211496 Introduction of applicability for SRVCC from NG-RAN to 3GPP UTRAN CR

revision of R5-210564

CATT, TDIA, Huawei, Hisilicon 38.523-2 16.6.0 CR#1211 catF SRVCC_NR_to_UMTS-UEConTest Rel-16 R5-90-e

AI: 6.3.24.4

agreed [WTS] [JSN]
R5-211497 Editorial update IE PhysicalCellGroupConfig CR

revision of R5-210263

Ericsson 38.508-1 16.6.0 CR#16821 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-211498 Introduction of support for URLLC CR

revision of R5-211165

Ericsson 38.508-1 16.6.0 CR#17811 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-211499 Addition of QoS for URLLC CR

revision of R5-211166

Ericsson 38.508-1 16.6.0 CR#17821 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.1

agreed [WTS] [JSN]
R5-211500 Update test case 8.1.5.1.1 to add UE capability nr-HO-ToEN-DC-r16 CR

revision of R5-210028

China Telecommunications 38.523-1 16.6.0 CR#19161 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.4.4.1.5

agreed [WTS] [JSN]
R5-211501 Update of test case 8.2.1.1.1 to support Inter-RAT handover from NR to EN-DC CR

revision of R5-210027

China Telecommunications 38.523-1 16.6.0 CR#19151 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.4.4.2.1

agreed [WTS] [JSN]
R5-211502 Correction to 5GS Non-3GPP Access Test Case 9.2.2.2 CR

revision of R5-210808

ZTE Corporation 38.523-1 16.6.0 CR#20471 catF TEI15_Test, 5GS_Ph1-CT_n3GPPA-UEConTest Rel-16 R5-90-e

AI: 6.4.4.6

agreed [WTS] [JSN]
R5-211503 Introduction of a new test case for voice fallback indication under EPS Fallback with handover CR

revision of R5-210344

CATT, TDIA 38.523-1 16.6.0 CR#19631 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.4.11.1

agreed [WTS] [JSN]
R5-211504 Update to applicabilities for the EPS fallback test cases CR

revision of R5-210345

CATT, TDIA 38.523-2 16.6.0 CR#1181 catF TEI16_Test Rel-16 R5-90-e

AI: 6.4.5

agreed [WTS] [JSN]
R5-211505 Correction to emergency bearer service over S1 for eCall test cases CR

revision of R5-210071

Keysight Technologies UK, Qualcomm 36.508 16.7.0 CR#13401 catF TEI14_Test, EIEI-UEConTest Rel-16 R5-90-e

AI: 6.5.1

agreed [WTS] [JSN]
R5-211506 Editorial for Table 6.6.2-10 Reference packet filter #9 CR

revision of R5-211203

NIST 36.508 16.7.0 CR#13491 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.1

agreed [WTS] [JSN]
R5-211507 Correction to Test frequencies for NB-IoT FDD MFBI CR

revision of R5-211320

ANRITSU LTD 36.508 16.7.0 CR#13501 catF TEI13_Test, NB_IOT-UEConTest Rel-16 R5-90-e

AI: 6.5.1

agreed [WTS] [JSN]
R5-211508 Clarification of DRB identity in CLOSE UE TEST LOOP message in 36.509 CR

revision of R5-210518

Anritsu 36.509 15.4.0 CR#2081 catF TEI15_Test Rel-15 R5-90-e

AI: 6.5.2

agreed [WTS] [JSN]
R5-211509 Update of TC WLAN measurement collection in Immediate MDT for specific sys infos CR

revision of R5-210048

CMCC 36.523-1 16.7.0 CR#49931 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

agreed [WTS] [JSN]
R5-211510 Update of TC WLAN measurement collection in Logged MDT for specific sys infos CR

revision of R5-210049

CMCC 36.523-1 16.7.0 CR#49941 catF TEI15_Test, LTE_MDT_BT_WLAN-UEConTest Rel-16 R5-90-e

AI: 6.5.3.3.5

agreed [WTS] [JSN]
R5-211511 Correction to Test Case 10.2.2 CR

revision of R5-211205

NIST 36.523-1 16.7.0 CR#50131 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.3.5

agreed [WTS] [JSN]
R5-211512 Update to TC 13.1.22 MCPTT / Attach / Call setup CO CR

revision of R5-210153

Samsung 36.523-1 16.7.0 CR#50041 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.3.8

agreed [WTS] [JSN]
R5-211513 Editorial updates of TS 36.523-1 Sections 22 and 24 CR

revision of R5-210150

Samsung 36.523-1 16.7.0 CR#50031 catF TEI9_Test Rel-16 R5-90-e

AI: 6.5.3.11

agreed [WTS] [JSN]
R5-211514 Adding specs to References in TS 36.523-1 CR

revision of R5-210556

Samsung 36.523-1 16.7.0 CR#50051 catF TEI14_Test Rel-16 R5-90-e

AI: 6.5.3.11

agreed [WTS] [JSN]
R5-211515 Addition of LTE TC applicability CR

revision of R5-210686

Huawei, Hisilicon, MCC TF160 36.523-2 16.7.0 CR#13361 catF TEI8_Test Rel-16 R5-90-e

AI: 6.5.4

agreed [WTS] [JSN]
R5-211516 Corrections for support of multiple GPS signals CR

revision of R5-210051

Spirent Communications 37.571-5 16.3.0 CR#2031 catF TEI12_Test Rel-16 R5-90-e

AI: 6.6.7.4

agreed [WTS] [JSN]
R5-211517 Addition of a generic procedure for MCPTT radio bearer establishment for use of pre-established session CR

revision of R5-210204

MCC TF160 36.579-1 15.0.0 CR#1001 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-211518 Correction to generic test procedure for MCPTT pre-established session establishment CR

revision of R5-210206

MCC TF160 36.579-1 15.0.0 CR#1021 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-211519 Update to Default Message Content - REFER and Resource-List CR

revision of R5-210212

MCC TF160 36.579-1 15.0.0 CR#1081 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-211520 MCPTT Info Corrections CR

revision of R5-210551

UPV/EHU, Nemergent Solutions, MCC TF160 36.579-1 15.0.0 CR#1191 catF TEI14_Test, MCPTT-ConTest Rel-15 R5-90-e

AI: 6.6.9.1

agreed [WTS] [JSN]
R5-211521 Correction to MCPTT Test Case 5.3 CR

revision of R5-210223

MCC TF160 36.579-2 14.9.1 CR#1091 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211522 Correction to MCPTT Test Case 5.4 CR

revision of R5-210224

MCC TF160 36.579-2 14.9.1 CR#1101 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211523 Correction to MCPTT Test Case 6.1.1.1 CR

revision of R5-210225

MCC TF160 36.579-2 14.9.1 CR#1111 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211524 Correction to MCPTT Test Case 6.1.1.10 CR

revision of R5-210226

MCC TF160, NIST, UPV/EHU, Nemergent Solutions 36.579-2 14.9.1 CR#1121 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211525 Correction to MCPTT Test Case 6.1.1.2 CR

revision of R5-210231

MCC TF160 36.579-2 14.9.1 CR#1171 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211526 Correction to MCPTT Test Case 6.1.1.5 CR

revision of R5-210233

MCC TF160 36.579-2 14.9.1 CR#1191 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211527 Correction to MCPTT Test Case 6.1.1.8 CR

revision of R5-210234

MCC TF160 36.579-2 14.9.1 CR#1201 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211528 Correction to MCPTT Test Case 6.1.2.10 CR

revision of R5-210236

MCC TF160 36.579-2 14.9.1 CR#1221 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211529 Correction to MCPTT Test Case 6.1.2.11 CR

revision of R5-210237

MCC TF160 36.579-2 14.9.1 CR#1231 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211530 Correction to MCPTT Test Case 6.1.2.12 CR

revision of R5-210238

MCC TF160 36.579-2 14.9.1 CR#1241 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211531 Correction to MCPTT Test Case 6.1.2.7 CR

revision of R5-210239

MCC TF160 36.579-2 14.9.1 CR#1251 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211532 Correction to MCPTT Test Case 6.1.2.8 CR

revision of R5-210240

MCC TF160 36.579-2 14.9.1 CR#1261 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211533 Correction to MCPTT Test Case 6.1.2.9 CR

revision of R5-210241

MCC TF160 36.579-2 14.9.1 CR#1271 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211534 Correction to MCPTT Test Case 6.2.1 CR

revision of R5-210242

MCC TF160 36.579-2 14.9.1 CR#1281 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211535 Correction to MCPTT Test Case 6.2.14 CR

revision of R5-210243

MCC TF160 36.579-2 14.9.1 CR#1291 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211536 Correction to MCPTT Test Case 6.2.15 CR

revision of R5-210244

MCC TF160 36.579-2 14.9.1 CR#1301 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211537 Correction to MCPTT Test Case 6.2.16 CR

revision of R5-210245

MCC TF160 36.579-2 14.9.1 CR#1311 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211538 Correction to MCPTT Test Case 6.2.17 CR

revision of R5-210246

MCC TF160 36.579-2 14.9.1 CR#1321 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211539 Correction to MCPTT Test Case 6.2.2 CR

revision of R5-210247

MCC TF160 36.579-2 14.9.1 CR#1331 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211540 Correction to MCPTT Test Case 6.2.3 CR

revision of R5-210248

MCC TF160 36.579-2 14.9.1 CR#1341 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211541 Correction to MCPTT Test Case 6.2.4 CR

revision of R5-210249

MCC TF160 36.579-2 14.9.1 CR#1351 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211542 Correction to MCPTT Test Case 6.2.5 CR

revision of R5-210250

MCC TF160 36.579-2 14.9.1 CR#1361 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211543 Correction to MCPTT Test Case 6.2.6 CR

revision of R5-210251

MCC TF160 36.579-2 14.9.1 CR#1371 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211544 Correction to MCPTT Test Case 6.2.7 CR

revision of R5-210252

MCC TF160 36.579-2 14.9.1 CR#1381 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.2

agreed [WTS] [JSN]
R5-211545 Addition of missing MCX PICS CR

revision of R5-210254

MCC TF160 36.579-4 14.4.1 CR#121 catF TEI14_Test, MCPTT-ConTest Rel-14 R5-90-e

AI: 6.6.9.4

agreed [WTS] [JSN]
R5-211546 Correction to MCVideo Test Case 6.1.1.9 CR

revision of R5-211250

NIST 36.579-6 14.0.0 CR#11 catF TEI14_Test, MCImp-UEConTest Rel-14 R5-90-e

AI: 6.6.9.6

agreed [WTS] [JSN]
R5-211547 Correction to EPS Fallback Test Case 11.1.1 CR

revision of R5-210268

Qualcomm CDMA Technologies, Anritsu 38.523-1 16.6.0 CR#19561 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 6.3.2.4.8.1

agreed [WTS] [JSN]
R5-211548 Addition of NID information for Rel-16 NPN CR

revision of R5-210374

Qualcomm CDMA Technologies 38.508-1 16.6.0 CR#16951 catF NG_RAN_PRN_Vertical_LAN-UEConTest Rel-16 R5-90-e

AI: 6.3.19.1

agreed [WTS] [JSN]
R5-211549 Addition of UAI test function CR

revision of R5-211283

Qualcomm CDMA Technologies 38.509 15.9.0 CR#341 catB NR_UE_pow_sav-UEConTest Rel-16 R5-90-e

AI: 6.3.18.3

agreed [WTS] [JSN]
R5-211550 Addition of test function Set UE Capability Info draftCR

revision of R5-210376

Qualcomm CDMA Technologies RACS-UEConTest Rel-16 R5-90-e

AI: 6.3.20.

noted [WTS] [JSN]
R5-211600 Reply LS on nominal channel spacing calculation for two carriers at band n41 with 40MHz and 80MHz channel bandwidths LS out

LS is reply to R4-2016779

LS To: TSG WG RAN4

TSG WG RAN5 NR_newRAT-Core Rel-15 R5-90-e

AI: 5.7

approved [WTS] [JSN]
R5-211601 Update to 5.4.3.1 EN-DC FR2 timing advance adjustment accuracy CR

revision of R5-210953

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#11071 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

withdrawn [WTS] [JSN]
R5-211602 Introducing PICS for CA_n28A-n41A CR

revision of R5-210937

Huawei, Hisilicon 38.508-2 16.6.0 CR#1581 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.2

withdrawn [WTS] [JSN]
R5-211603 Update to 5.4.1.1 EN-DC FR2 UE transmit timing accuracy CR

revision of R5-210952

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#11061 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

withdrawn [WTS] [JSN]
R5-211604 Introduction of test frequencies for CBW 70 MHz for n77 CR Ericsson, China Unicom 38.508-1 16.6.0 CR#1794 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.1

agreed [WTS] [JSN]
R5-211605 Introduction of test frequencies for CBW 70 MHz for n78 CR Ericsson, China Unicom 38.508-1 16.6.0 CR#1795 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.1

agreed [WTS] [JSN]
R5-211606 Updating test point analysis for FR1 REFSENS for CA test case CR

revision of R5-210901

Huawei, Hisilicon 38.905 16.6.0 CR#3551 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

withdrawn [WTS] [JSN]
R5-211607 Update MU threshold for DL AWGN absolute power for RRM FR2 CR

revision of R5-210604

Keysight Technologies UK Ltd 38.903 16.6.0 CR#2011 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

withdrawn [WTS] [JSN]
R5-211608 Update of Tx test procedure for PC2 UE on FDD bands due to maxUplinkDutyCycle CR

revision of R5-211024

Huawei, HiSilicon, Bureau Veritas 38.521-1 16.6.0 CR#11791 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-211609 Clarification on exception requirements for Intermodulation due to Dual uplink (IMD) LS out

LS To: TSG WG RAN4

TSG WG RAN5 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 5.7

approved [WTS] [JSN]
R5-211610 Applicability of Error Vector Magnitude for V2X for non-concurrent operation CR LG Electronics 38.522 16.6.0 CR#67 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.7

agreed [WTS] [JSN]
R5-211611 Applicability for RRM NR HST test case 6.1.1.7 and 6.6.1.7 CR

revised to R5-211918

CMCC 38.522 16.6.0 CR#68 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.4

revised [WTS] [JSN]
R5-211612 Update of 6.5.2 interruption during measurement on deactivated SCC CR

revision of R5-210862

Huawei, HiSilicon, Keysight 38.533 16.6.0 CR#11001 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

withdrawn [WTS] [JSN]
R5-211613 Spurious emissions for UE co-existence update to core specs CR

revision of R5-211042

Keysight Technologies UK Ltd 38.521-1 16.6.0 CR#11841 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-211614 Update of Scell activation and CSI reporting time for EN-DC TC 4.5.3.1 CR

revision of R5-210174

MediaTek Inc. 38.533 16.6.0 CR#10071 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211615 Complete RRM 4.5.7.1 including TT analysis results CR

revision of R5-210436

ROHDE & SCHWARZ 38.533 16.6.0 CR#10261 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211616 Update Test Tolerance for FR1 RLM Test Cases CR

revision of R5-210821

ANRITSU LTD 38.533 16.6.0 CR#10871 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211617 Correction to EN-DC radio link monitoring CR

revision of R5-210854

Huawei, HiSilicon 38.533 16.6.0 CR#10921 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211618 Update of 4.5.3.1 SCell activation and deactivation CR

revision of R5-210855

Huawei, HiSilicon 38.533 16.6.0 CR#10931 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211619 Update to 4.5.4.1 EN-DC FR1 UE UL carrier RRC reconfiguration delay CR

revision of R5-210954

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#11081 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211620 Update to 4.7.5.1 EN-DC FR1 SFTD measurement accuracy CR

revision of R5-210955

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#11091 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211621 Correction of applied TT for EN-DC FR1 L1-RSRP measurement test cases CR

revision of R5-211211

Ericsson 38.533 16.6.0 CR#11171 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211622 Update 5.4.3.1 with TT analysis results CR

revision of R5-210432

ROHDE & SCHWARZ 38.533 16.6.0 CR#10231 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

agreed [WTS] [JSN]
R5-211623 Correction of EN-DC FR2 inter-freq measurement test case 5.6.2.1 including TT CR

revision of R5-211213

Ericsson 38.533 16.6.0 CR#11191 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

agreed [WTS] [JSN]
R5-211624 Correction of EN-DC FR2 inter-freq measurement test case 5.6.2.3 including TT CR

revision of R5-211214

Ericsson 38.533 16.6.0 CR#11201 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.2

agreed [WTS] [JSN]
R5-211625 Update of CSI reporting time for SA TC 6.5.3.1 CR

revision of R5-210175

MediaTek Inc. 38.533 16.6.0 CR#10081 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211626 Correction to SA radio link monitoring CR

revision of R5-210856

Huawei, HiSilicon 38.533 16.6.0 CR#10941 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211627 Update to 6.3.2.2.1 Contention based random access test in FR1 for NR standalone CR

revision of R5-210956

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#11101 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211628 Update to 6.3.2.2.2 Non-Contention based random access test in FR1 for NR standalone CR

revision of R5-210957

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#11111 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211629 Update to 6.5.2.1 NR SA FR1 interruptions during measurements on deactivated NR SCC CR

revision of R5-210958

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#11121 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211630 Update to 6.6.3.1 NR SA FR1 - E-UTRAN event-triggered reporting in non-DRX CR

revision of R5-210960

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#11141 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211631 Update to 6.6.3.2 NR SA FR1 - E-UTRAN event-triggered reporting in DRX CR

revision of R5-210961

Qualcomm Technologies Netherlands B.V. 38.533 16.6.0 CR#11151 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211632 Correction of applied TT for SA FR1 L1-RSRP measurement test cases CR

revision of R5-211212

Ericsson 38.533 16.6.0 CR#11181 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211633 Correction of SA FR2 inter-freq measurement test case 7.6.2.1 including TT CR

revision of R5-211215

Ericsson 38.533 16.6.0 CR#11211 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

agreed [WTS] [JSN]
R5-211634 Correction of SA FR2 inter-freq measurement test case 7.6.2.3 including TT CR

revision of R5-211216

Ericsson 38.533 16.6.0 CR#11221 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

agreed [WTS] [JSN]
R5-211635 Complete FR2 iRAT measurement accuracy test cases CR

revision of R5-210439

ROHDE & SCHWARZ 38.533 16.6.0 CR#10281 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.5

agreed [WTS] [JSN]
R5-211636 Update Annex F for 5.4.3.1 and 7.4.3.1 with TT analysis results CR

revision of R5-210433

ROHDE & SCHWARZ 38.533 16.6.0 CR#10241 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-211637 Update DL AWGN MU for RRM FR2 CR

revision of R5-210453

ROHDE & SCHWARZ 38.533 16.6.0 CR#10381 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-211638 Update FR2 Downlink and Uplink MU values CR

revision of R5-210813

ANRITSU LTD 38.533 16.6.0 CR#10841 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-211639 Update of Annex F for Test Tolerance CR

revision of R5-210865

Huawei, HiSilicon 38.533 16.6.0 CR#11031 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-211640 Correction of MTSU and applied TT in Annex F CR

revision of R5-211217

Ericsson 38.533 16.6.0 CR#11231 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-211641 Addition of new RMCs and OCNGs into Annex A CR

revision of R5-211225

Ericsson 38.533 16.6.0 CR#11301 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-211642 Test tolerance analysis for 4.5.7.1 CR

revision of R5-210435

ROHDE & SCHWARZ 38.903 16.6.0 CR#1941 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211643 Update SS-RSRP measurement accuracy TT analyses for SNR uncertainty change CR

revision of R5-210441

ROHDE & SCHWARZ 38.903 16.6.0 CR#1961 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211644 Update RRM MU values for FR2 CR

revision of R5-210454

ROHDE & SCHWARZ 38.903 16.6.0 CR#1991 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211645 Update of FR1 TT for SCell activation CR

revision of R5-210847

Huawei, HiSilicon 38.903 16.6.0 CR#2111 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211646 Update of FR1 TT for SSB based link recovery CR

revision of R5-210848

Huawei, HiSilicon 38.903 16.6.0 CR#2121 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211647 Update of FR1 TT for CSI-RS based link recovery CR

revision of R5-210849

Huawei, HiSilicon 38.903 16.6.0 CR#2131 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211648 Update of FR1 TT for RRC re-establishment CR

revision of R5-210850

Huawei, HiSilicon 38.903 16.6.0 CR#2141 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211649 Update of Test Tolerance analysis for FR1 event triggered reporting test cases CR

revision of R5-211208

Ericsson 38.903 16.6.0 CR#2191 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211650 Update of Test Tolerance analysis for FR1 SSB-based L1-RSRP test cases CR

revision of R5-211209

Ericsson 38.903 16.6.0 CR#2201 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211651 Update of Test Tolerance analysis for FR1 CSI-RS based L1-RSRP test cases CR

revision of R5-211210

Ericsson 38.903 16.6.0 CR#2211 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211652 Test Tolerance analysis for FR2 event triggered reporting test cases CR

revision of R5-211273

Ericsson 38.903 16.6.0 CR#2241 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211653 On the DL AWGN MTSU for RRM discussion

revision of R5-210452

ROHDE & SCHWARZ R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211654 FR1 Test Tolerance review training discussion

revision of R5-211206

Ericsson Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211655 FR2 Test Tolerance review training discussion

revision of R5-211207

Ericsson Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211656 On the MU for n259 discussion

revision of R5-211263

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211657 PC1 and PC3 Updates for Band n14 CR

revision of R5-211181

AT&T 38.521-1 16.6.0 CR#11921 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

agreed [WTS] [JSN]
R5-211658 Addition of new test case 6.3.2.1.3 2Rx FDD FR1 Multiple PMI with 16Tx Type1 - SinglePanel codebook for both SA and NSA CR

revision of R5-211160

China Telecom 38.521-4 16.6.0 CR#2971 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

agreed [WTS] [JSN]
R5-211659 Addition of new test case 6.3.3.1.3 4Rx FDD FR1 Multiple PMI with 16Tx Type1 - SinglePanel codebook for both SA and NSA CR

revision of R5-211161

China Telecom 38.521-4 16.6.0 CR#2981 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

agreed [WTS] [JSN]
R5-211660 Update of EN-DC inter-band configurations in clause 4.3.1 CR

revision of R5-210077

China Telecommunications 38.508-1 16.6.0 CR#16771 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

agreed [WTS] [JSN]
R5-211661 Addition of 3 band EN-DC Test Frequency (DC_1A-8A_n78A, DC_3A-8A_n78A) CR

revision of R5-210349

KT Corp. 38.508-1 16.6.0 CR#16901 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

agreed [WTS] [JSN]
R5-211662 Addition of 4 band EN-DC Test Frequency (DC_1A-3A-8A_n78A) CR

revision of R5-210350

KT Corp. 38.508-1 16.6.0 CR#16911 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.1

agreed [WTS] [JSN]
R5-211663 Update PDSCH-TimeDomainResourceAllocationList to consider coreset0 for Demod FR2 test cases CR

revision of R5-210768

Keysight Technologies UK Ltd 38.508-1 16.6.0 CR#17431 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

agreed [WTS] [JSN]
R5-211664 Update message content for PMI reporting test cases CR

revision of R5-211046

Keysight Technologies UK Ltd 38.508-1 16.6.0 CR#17631 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

agreed [WTS] [JSN]
R5-211665 Changes to RRM default message contents CR

revision of R5-210469

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#17051 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

agreed [WTS] [JSN]
R5-211666 Add SSB Index table for RRM with SECOND_SSB condition CR

revision of R5-210477

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#17061 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

agreed [WTS] [JSN]
R5-211667 Addition of default configuration of CSI-IM for RRM tests CR

revision of R5-210872

Huawei, HiSilicon 38.508-1 16.6.0 CR#17511 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

agreed [WTS] [JSN]
R5-211668 Specify CSI-SSB-ResourceSet for RRM CR

revision of R5-211199

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#17901 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.3

agreed [WTS] [JSN]
R5-211669 Editorial rework of the conditions for CSI-FrequencyOccupation CR

revision of R5-210461

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#17021 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

agreed [WTS] [JSN]
R5-211670 Align TDD UL DL Common for RRM with TS 38.533 CR

revision of R5-210462

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#17031 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

agreed [WTS] [JSN]
R5-211671 Correct reportOffsetList in CSI-ReportConfig CR

revision of R5-210479

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#17071 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

agreed [WTS] [JSN]
R5-211672 Specify CSI-SSB-ResourceSet CR

revision of R5-210480

ROHDE & SCHWARZ 38.508-1 16.6.0 CR#17081 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

agreed [WTS] [JSN]
R5-211673 Clarification on the connection diagram for FR2 demod and RRM test cases CR

revision of R5-211047

Anritsu 38.508-1 16.6.0 CR#17641 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.4

agreed [WTS] [JSN]
R5-211674 Introduction of UE capabilities for Rel-15 EN-DC FR2 configuration CA_n261(2A) CR

revision of R5-211036

Ericsson 38.508-2 16.6.0 CR#1621 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-211675 Clarification of DRB identity in CLOSE UE TEST LOOP message in 38.509 CR

revision of R5-210519

Anritsu 38.509 15.9.0 CR#331 catF 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 5.3.2.3

agreed [WTS] [JSN]
R5-211676 Clarifications for ON/OFF time mask for UL MIMO test case CR

revision of R5-210292

Keysight Technologies UK Ltd 38.521-1 16.6.0 CR#11101 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-211677 Correction of test frequencies for NR band n28 30MHz test channel bandwidth of CA SUL and UL MIMO test cases in section 6 CR

revision of R5-210486

CAICT 38.521-1 16.6.0 CR#11261 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-211678 Updating AMPR for MIMO test case for NS_35 CR

revision of R5-210907

Huawei, Hisilicon 38.521-1 16.6.0 CR#11511 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-211679 Correction to RB allocation start for test case 6.3D.4.2 CR

revision of R5-210910

Huawei, Hisilicon, Ericsson 38.521-1 16.6.0 CR#11531 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-211680 Correction of test frequencies for NR band n28 30MHz test channel bandwidth of CA SUL and UL MIMO test cases in section 7 CR

revision of R5-210488

CAICT 38.521-1 16.6.0 CR#11281 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.2

agreed [WTS] [JSN]
R5-211681 Updating test case 7.3C.2-Reference sensitivity power level for SUL CR

revision of R5-210904

Huawei, Hisilicon, CAICT 38.521-1 16.6.0 CR#11491 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.2

agreed [WTS] [JSN]
R5-211682 Update of clause 5 to R15 TS 38.521-1 CR

revision of R5-210802

China Unicom 38.521-1 16.6.0 CR#11431 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.4.3

agreed [WTS] [JSN]
R5-211683 Editorial corrections in Occupied bandwidth test procedure CR

revision of R5-210297

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#4561 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211684 FR2 UL CA Frequency error test cases update CR

revision of R5-210543

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#4651 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211685 Addition of Inner_partial allocation in general section and a few test cases CR

revision of R5-210727

Huawei, HiSilicon, Keysight 38.521-2 16.6.0 CR#4691 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211686 Correction of parameter configuration for open loop power control CR

revision of R5-210728

Huawei, HiSilicon 38.521-2 16.6.0 CR#4701 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211687 Correction to test points of FR1 EN-DC intermodulation with 3CC in TC 7.8B.2.6 CR

revision of R5-211101

Anritsu 38.521-3 16.6.0 CR#9191 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

withdrawn [WTS] [JSN]
R5-211688 Addition of new test case 6.2A.1.1.4 UE maximum output power - EIRP and TRP for 5UL CA CR

revision of R5-211028

KTL 38.521-2 16.6.0 CR#4761 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211689 Addition of new test case 6.2A.1.1.5 UE maximum output power - EIRP and TRP for 6UL CA CR

revision of R5-211029

KTL 38.521-2 16.6.0 CR#4771 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211690 Addition of new test case 6.2A.1.1.6 UE maximum output power - EIRP and TRP for 7UL CA CR

revision of R5-211030

KTL 38.521-2 16.6.0 CR#4781 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211691 Addition of new test case 6.2A.1.1.7 UE maximum output power - EIRP and TRP for 8UL CA CR

revision of R5-211031

KTL 38.521-2 16.6.0 CR#4791 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211692 Corrections to reference figures for transmission bandwidth configuration in FR2 CR

revision of R5-211114

ZTE Corporation 38.521-2 16.6.0 CR#4871 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211693 Update of Annex F for test case 7.3.4 CR

revision of R5-211267

ROHDE & SCHWARZ 38.521-2 16.6.0 CR#4931 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-211694 Spectrum emissions mask for intra-band non-contiguous EN-DC Test Definition CR

revision of R5-210298

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#8441 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211695 ACLR for intra-band non-contiguous EN-DC Test Definition CR

revision of R5-210303

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#8491 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211696 Update Test description of 6.5B.1.1 CR

revision of R5-210386

Guangdong OPPO Mobile Telecom. 38.521-3 16.6.0 CR#8561 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211697 EN-DC FR2 UL CA Frequency error test cases update CR

revision of R5-210545

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#8711 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211698 Correction of test requirements for EN-DC configured output power CR

revision of R5-210737

Huawei, HiSilicon, Anritsu 38.521-3 16.6.0 CR#8761 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211699 Introduction of Rel-15 EN-DC configuration DC_8A_n77A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211053

Ericsson 38.521-3 16.6.0 CR#9061 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211700 Introduction of Rel-15 EN-DC configuration DC_11A_n77A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211054

Ericsson 38.521-3 16.6.0 CR#9071 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211701 Introduction of Rel-15 EN-DC configuration DC_11A_n78A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211055

Ericsson 38.521-3 16.6.0 CR#9081 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211702 Introduction of Rel-15 EN-DC configuration DC_11A_n79A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211056

Ericsson 38.521-3 16.6.0 CR#9091 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211703 Introduction of Rel-15 EN-DC configuration DC_25A_n41A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211057

Ericsson 38.521-3 16.6.0 CR#9101 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211704 Introduction of Rel-15 EN-DC configuration DC_26A_n41A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211058

Ericsson 38.521-3 16.6.0 CR#9111 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211705 Introduction of Rel-15 EN-DC configuration DC_26A_n77A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211059

Ericsson 38.521-3 16.6.0 CR#9121 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211706 Introduction of Rel-15 EN-DC configuration DC_26A_n78A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211060

Ericsson 38.521-3 16.6.0 CR#9131 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211707 Introduction of Rel-15 EN-DC configuration DC_26A_n79A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211061

Ericsson 38.521-3 16.6.0 CR#9141 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211708 Introduction of Rel-15 EN-DC configuration DC_41A_n77A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211062

Ericsson 38.521-3 16.6.0 CR#9151 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211709 Introduction of Rel-15 EN-DC configuration DC_41A_n78A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-211063

Ericsson 38.521-3 16.6.0 CR#9161 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211710 Correction of MSD test point on Table 7.3B.2.0.3.5.2-1 DC_1A-8A_n78A CR

revision of R5-210351

KT Corp. 38.521-3 16.6.0 CR#8531 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211711 Update of 7.3B.2.3_1.1 RefSens DC_3A-8A_n78A CR

revision of R5-210352

KT Corp. 38.521-3 16.6.0 CR#8541 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211712 Addition of new test case 7.3B.4 for EIS Spherical Coverage CR

revision of R5-210358

ROHDE & SCHWARZ 38.521-3 16.6.0 CR#8551 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211713 Editorial correction for errors in 7.6B.4.3_1 CR

revision of R5-210503

CAICT 38.521-3 16.6.0 CR#8671 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211714 Correction of test configuration tables in section 7 CR

revision of R5-210504

CAICT 38.521-3 16.6.0 CR#8681 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211715 Clarification of tested Rx antenna numbers on E-UTRA band CR

revision of R5-210738

Huawei, HiSilicon, Bureau Veritas 38.521-3 16.6.0 CR#8771 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211716 Correction to DCI bit size for PDSCH Type B performance and LTE coexistence tests CR

revision of R5-210525

Anritsu 38.521-4 16.6.0 CR#2801 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

agreed [WTS] [JSN]
R5-211717 Correction to LB setup DRB in CLOSE UE TEST LOOP message CR

revision of R5-210526

Anritsu 38.521-4 16.6.0 CR#2811 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

agreed [WTS] [JSN]
R5-211718 Correction to NR test case 6.2.2.1.2.1 CR

revision of R5-210870

Huawei, HiSilicon 38.521-4 16.6.0 CR#2861 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.1

agreed [WTS] [JSN]
R5-211719 Correction to E-UTRA link setup for NSA testing CR

revision of R5-210318

ROHDE & SCHWARZ 38.521-4 16.6.0 CR#2731 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.4

agreed [WTS] [JSN]
R5-211720 Correction of applicability definitions for PUSCH HalfPi BPSK related test cases CR

revision of R5-210505

CAICT 38.522 16.6.0 CR#541 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

agreed [WTS] [JSN]
R5-211721 Correction PICS condition of test case 6.4.2.5 CR

revision of R5-211183

Google Inc. 38.522 16.6.0 CR#621 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

withdrawn [WTS] [JSN]
R5-211722 Correction EN-DC FR1 timing tests CR

revision of R5-210459

ROHDE & SCHWARZ 38.533 16.6.0 CR#10421 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211723 Corrections to 5.4.1.1 CR

revision of R5-210460

ROHDE & SCHWARZ 38.533 16.6.0 CR#10431 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211724 Clarification of SNR for 4RX UE in RLM Test Cases CR

revision of R5-210527

Anritsu 38.533 16.6.0 CR#10611 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211725 Correction in 4.7.3.2.1 test parameters CR

revision of R5-210607

Keysight Technologies UK Ltd 38.533 16.6.0 CR#10761 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.1

agreed [WTS] [JSN]
R5-211726 Update of RRC message for TC 6.3.1.4, 6.3.1.5 and 6.3.2.3.2 CR

revision of R5-210172

MediaTek Inc. 38.533 16.6.0 CR#10051 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211727 Corrections NR SA FR1 timing test cases CR

revision of R5-210464

ROHDE & SCHWARZ 38.533 16.6.0 CR#10451 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211728 Correction to NR TC 6.6.3.2-Inter-RAT DRX CR

revision of R5-210859

Huawei, HiSilicon 38.533 16.6.0 CR#10971 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211729 Update of 6.5.1.2 and 6.5.1.4 SSB based RLM CR

revision of R5-210861

Huawei, HiSilicon 38.533 16.6.0 CR#10991 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211730 Clarification of BWP1 and BWP2 in 7.6.1.3 and 7.6.1.4 CR

revision of R5-210796

MediaTek Inc. 38.533 16.6.0 CR#10831 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.4

agreed [WTS] [JSN]
R5-211731 Addition of Serving Cell Config for RRM timing test cases CR

revision of R5-210463

ROHDE & SCHWARZ 38.533 16.6.0 CR#10441 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-211732 Editorial correction to several MU factors CR

revision of R5-210735

Huawei, HiSilicon 38.903 16.6.0 CR#2021 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211733 Updated TP analysis for 7.3B Reference sensitivity for EN-DC in FR1 CR

revision of R5-210090

Nokia, Nokia Shanghai Bell 38.905 16.6.0 CR#3401 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211734 TP analysis for 38.521-3 test case 6.5B.2.2.1 SEM Intra-band non-contiguous CR

revision of R5-210309

Keysight Technologies UK Ltd 38.905 16.6.0 CR#3411 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211735 TP analysis for 38.521-3 test case 6.5B.2.2.3 ACLR Intra-band non-contiguous CR

revision of R5-210310

Keysight Technologies UK Ltd 38.905 16.6.0 CR#3421 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211736 Update of test point analysis for FR2 UL CA frequency error test cases CR

revision of R5-210544

Keysight Technologies UK Ltd 38.905 16.6.0 CR#3451 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211737 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_8A_n77A CR

revision of R5-211064

Ericsson 38.905 16.6.0 CR#3691 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211738 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_11A_n77A CR

revision of R5-211065

Ericsson 38.905 16.6.0 CR#3701 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211739 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_11A_n78A CR

revision of R5-211066

Ericsson 38.905 16.6.0 CR#3711 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211740 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_11A_n79A CR

revision of R5-211067

Ericsson 38.905 16.6.0 CR#3721 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211741 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_25A_n41A CR

revision of R5-211068

Ericsson 38.905 16.6.0 CR#3731 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211742 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_26A_n41A CR

revision of R5-211069

Ericsson 38.905 16.6.0 CR#3741 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211743 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_26A_n77A CR

revision of R5-211070

Ericsson 38.905 16.6.0 CR#3751 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211744 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_26A_n78A CR

revision of R5-211071

Ericsson 38.905 16.6.0 CR#3761 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211745 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_26A_n79A CR

revision of R5-211072

Ericsson 38.905 16.6.0 CR#3771 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211746 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_41A_n77A CR

revision of R5-211073

Ericsson 38.905 16.6.0 CR#3781 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211747 Introduction of spurious emission TP analysis for Rel-15 EN-DC configuration DC_41A_n78A CR

revision of R5-211074

Ericsson 38.905 16.6.0 CR#3791 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211748 Test Point analysis update for FR2 Tx additional spurious emission test case CR

revision of R5-211228

Qualcomm Finland RFFE Oy 38.905 16.6.0 CR#3881 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211749 Addition of new test case 9.6.1.1_A.6 CR

revision of R5-210073

DEKRA 36.521-1 16.7.0 CR#52421 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-211750 Addition of new test case 9.6.1.2_A.6 CR

revision of R5-210074

DEKRA 36.521-1 16.7.0 CR#52431 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-211751 Addition of the definition of CA capability with 6DL and 7DL CCs CR

revision of R5-210403

LG Electronics 36.521-1 16.7.0 CR#52451 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.2

agreed [WTS] [JSN]
R5-211752 Update to applicability TDD FDD 7DL CA Peformance test cases CR

revision of R5-210408

LG Electronics 36.521-2 16.7.0 CR#9471 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.3

agreed [WTS] [JSN]
R5-211753 Addition of new test case 9.1.72 CR

revision of R5-210075

DEKRA 36.521-3 16.7.0 CR#25551 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.4

agreed [WTS] [JSN]
R5-211754 Addition of new test case 9.2.59 CR

revision of R5-210076

DEKRA 36.521-3 16.7.0 CR#25561 catF LTE_CA_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.3.4

agreed [WTS] [JSN]
R5-211755 Addition of new test case 6.6.2.1_s SEM for sTTI CR

revision of R5-210779

Huawei, HiSilicon 36.521-1 16.7.0 CR#52641 catF LTE_sTTIandPT-UEConTest Rel-16 R5-90-e

AI: 5.3.5.2

agreed [WTS] [JSN]
R5-211756 Addition of new test case 6.6.2.3_s ACLR for sTTI CR

revision of R5-210781

Huawei, HiSilicon 36.521-1 16.7.0 CR#52661 catF LTE_sTTIandPT-UEConTest Rel-16 R5-90-e

AI: 5.3.5.2

agreed [WTS] [JSN]
R5-211757 Introduction of CA Idle Mode Measurement RRM Testcase Applicabilities CR

revision of R5-211292

Nokia, Nokia Shanghai Bell 36.521-2 16.7.0 CR#9571 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.2

agreed [WTS] [JSN]
R5-211758 Introduction of MU and TT for CA Idle Mode Measurements CR

revision of R5-211291

Nokia, Nokia Shanghai Bell 36.521-3 16.7.0 CR#25731 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.3

agreed [WTS] [JSN]
R5-211759 FDD Inter Frequency Absolute RSRP Accuracy CA Idle Mode Measurements for Non-Overlapping Carrier CR

revision of R5-211293

Nokia, Nokia Shanghai Bell 36.521-3 16.7.0 CR#25701 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.3

agreed [WTS] [JSN]
R5-211760 FDD Inter Frequency Absolute RSRP Accuracy CA Idle Mode Measurements for Overlapping Carrier CR

revision of R5-211294

Nokia, Nokia Shanghai Bell 36.521-3 16.7.0 CR#25711 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.3

agreed [WTS] [JSN]
R5-211761 FDD Intra Frequency Absolute RSRP Accuracy CA Idle Mode Measurements CR

revision of R5-211295

Nokia, Nokia Shanghai Bell 36.521-3 16.7.0 CR#25721 catF LTE_euCA-UEConTest Rel-16 R5-90-e

AI: 5.3.6.3

agreed [WTS] [JSN]
R5-211762 Update of 4.3.1.4.1 for test frequencies for EN-DC band combinations within FR1 CR

revision of R5-211122

ZTE Corporation 38.508-1 16.6.0 CR#17781 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.1

agreed [WTS] [JSN]
R5-211763 Update of 4.3.1.5.1 for test frequencies for EN-DC band combinations including FR2 CR

revision of R5-211123

ZTE Corporation 38.508-1 16.6.0 CR#17791 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.1

agreed [WTS] [JSN]
R5-211764 Update of 7.5A.3 Adjacent channel selectivity for 4DL CA CR

revision of R5-210382

China Telecommunications 38.521-1 16.6.0 CR#11131 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.2

agreed [WTS] [JSN]
R5-211765 Update of R16 CADC configurations into TS38.521-1 clause 5 CR

revision of R5-210803

China Unicom, Huawei, HiSilicon, NTT DOCOMO 38.521-1 16.6.0 CR#11441 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.3.3

agreed [WTS] [JSN]
R5-211766 Introduction of Rel-16 EN-DC configuration DC_7A_n3A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-210087

Nokia, Nokia Shanghai Bell, Ericsson 38.521-3 16.6.0 CR#8371 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

agreed [WTS] [JSN]
R5-211767 Introduction of Rel-16 EN-DC configuration DC_8A_n3A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-210088

Nokia, Nokia Shanghai Bell, Ericsson 38.521-3 16.6.0 CR#8381 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

agreed [WTS] [JSN]
R5-211768 Introduction of Rel-16 EN-DC configuration DC_20A_n1A to spurious emission test case 6.5B.3.3.2 CR

revision of R5-210089

Nokia, Nokia Shanghai Bell, Ericsson 38.521-3 16.6.0 CR#8391 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

agreed [WTS] [JSN]
R5-211769 Update for 6.5B.3.3.2 Spurious emission band UE co-existence_Rel16 CR

revision of R5-210986

Qualcomm Korea, Ericsson 38.521-3 16.6.0 CR#8871 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

agreed [WTS] [JSN]
R5-211770 Adding Delta TIB,c for DC_1A-28A_n3A, DC_7A-20A_n1A and DC_7A-28A_n3A to clause 6.2B.4.2.3.3 CR

revision of R5-211021

Ericsson 38.521-3 16.6.0 CR#9031 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.1

agreed [WTS] [JSN]
R5-211771 Introduction of DC_7A_n3A to reference sensitivity test CR

revision of R5-210091

Nokia, Nokia Shanghai Bell 38.521-3 16.6.0 CR#8401 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

agreed [WTS] [JSN]
R5-211772 Introduction of DC_8A_n1A and DC_8A_n3A to reference sensitivity test CR

revision of R5-210092

Nokia, Nokia Shanghai Bell 38.521-3 16.6.0 CR#8411 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

agreed [WTS] [JSN]
R5-211773 Adding Inter-band EN-DC combination within FR1 CR

revision of R5-210516

KDDI Corporation 38.521-3 16.6.0 CR#8691 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

agreed [WTS] [JSN]
R5-211774 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_7A_n3A CR

revision of R5-210084

Nokia, Nokia Shanghai Bell, Ericsson 38.905 16.6.0 CR#3371 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211775 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_8A_n3A CR

revision of R5-210085

Nokia, Nokia Shanghai Bell, Ericsson 38.905 16.6.0 CR#3381 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211776 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_20A_n1A CR

revision of R5-210086

Nokia, Nokia Shanghai Bell, Ericsson 38.905 16.6.0 CR#3391 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211777 Spur emission TP analysis R16 DC_2A_n41A CR

revision of R5-210962

Qualcomm Korea, Ericsson 38.905 16.6.0 CR#3611 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211778 Spur emission TP analysis R16 DC_13A_n2A CR

revision of R5-210980

Qualcomm Korea 38.905 16.6.0 CR#3631 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211779 Spur emission TP analysis R16 DC_48A_n5A CR

revision of R5-210981

Qualcomm Korea, Ericsson 38.905 16.6.0 CR#3641 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211780 Spur emission TP analysis R16 DC_48A_n66A CR

revision of R5-210982

Qualcomm Korea 38.905 16.6.0 CR#3651 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211781 Spur emission TP analysis R16 DC_66A_n41A CR

revision of R5-210985

Qualcomm Korea, Ericsson 38.905 16.6.0 CR#3661 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211782 Updates to Impact of Modem Performance in Application Layer Throughput CR

revision of R5-210595

QUALCOMM communications-France 37.901-5 16.2.0 CR#101 catF FS_UE_5GNR_App_Data_Perf Rel-16 R5-90-e

AI: 5.3.9.1

agreed [WTS] [JSN]
R5-211783 Update of 6.2.3A.1_3 Maximum Power Reduction for CA and HPUE CR

revision of R5-210874

Huawei, HiSilicon 36.521-1 16.7.0 CR#52681 catF LTE_TDD_HPUE_R15-UEConTest Rel-16 R5-90-e

AI: 5.3.10.1

agreed [WTS] [JSN]
R5-211784 Update of 4.3.1.0A for mid test channel bandwidth CR

revision of R5-211120

ZTE Corporation, Ericsson 38.508-1 16.6.0 CR#17761 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.1

agreed [WTS] [JSN]
R5-211785 Correction of test frequencies for NR band n48 CR

revision of R5-211233

Ericsson 38.508-1 16.6.0 CR#17921 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.1

agreed [WTS] [JSN]
R5-211786 Correction of test points for NS_48 CR

revision of R5-210739

Huawei, HiSilicon 38.521-1 16.6.0 CR#11341 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

agreed [WTS] [JSN]
R5-211787 Addition of A-MPR test for NS_49 CR

revision of R5-210741

Huawei, HiSilicon 38.521-1 16.6.0 CR#11351 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

agreed [WTS] [JSN]
R5-211788 Update for 6.5.3.2 Spurious emission for UE co-existence_R16 CR

revision of R5-210997

Qualcomm Korea, Keysight 38.521-1 16.6.0 CR#11771 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.1

agreed [WTS] [JSN]
R5-211789 Addition of R16 new channel bandwidths for n3 in 38.521-1 CR

revision of R5-210602

China Telecommunications 38.521-1 16.6.0 CR#11321 catF NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.3.3

withdrawn [WTS] [JSN]
R5-211790 Addition of 6.2.21 TDD Contention Based Random Access on Non-anchor Carrier Test for UE category NB1 UEs In-band mode in Enhanced Coverage CR

revision of R5-210883

Sporton 36.521-3 16.7.0 CR#25611 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-211791 Addition of 7.1.27 E-UTRAN TDD UE Transmit Timing Accuracy Tests for Category NB1 UE In-Band mode under normal coverage CR

revision of R5-210884

Sporton 36.521-3 16.7.0 CR#25621 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-211792 Addition of 7.1.28 E-UTRAN TDD - UE Transmit Timing Accuracy Tests for Category NB1 UE In-band mode under enhanced coverage CR

revision of R5-210885

Sporton 36.521-3 16.7.0 CR#25631 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-211793 Addition of 7.2.15 E-UTRAN TDD TDD UE Timing Advance Adjustment Accuracy Test for UE Category NB1 in Standalone Mode under Enhanced Coverage CR

revision of R5-210886

Sporton 36.521-3 16.7.0 CR#25641 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-211794 Addition of 7.3.88 TDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 In-band mode in normal coverage CR

revision of R5-210887

Sporton 36.521-3 16.7.0 CR#25651 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-211795 Addition of 7.3.89 TDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 In-band mode in enhanced coverage CR

revision of R5-210888

Sporton 36.521-3 16.7.0 CR#25661 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-211796 Addition of TDD NB-IOT RSTD measurement test case 9.7.1 CR

revision of R5-210751

Huawei, HiSilicon 37.571-1 16.7.0 CR#3121 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-211797 Addition of TDD NB-IOT RSTD measurement test case 9.7.2 CR

revision of R5-210752

Huawei, HiSilicon 37.571-1 16.7.0 CR#3131 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-211798 Addition of TDD NB-IOT RSTD measurement test case 9.7.3 CR

revision of R5-210753

Huawei, HiSilicon 37.571-1 16.7.0 CR#3141 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-211799 Addition of TDD NB-IOT RSTD measurement test case 9.8.1 CR

revision of R5-210754

Huawei, HiSilicon 37.571-1 16.7.0 CR#3151 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-211800 Addition of TDD NB-IOT RSTD measurement test case 9.8.2 CR

revision of R5-210755

Huawei, HiSilicon 37.571-1 16.7.0 CR#3161 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-211801 Addition of TDD NB-IOT RSTD measurement test case 9.8.3 CR

revision of R5-210756

Huawei, HiSilicon 37.571-1 16.7.0 CR#3171 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-211802 Addition of applicability for TDD NB-IOT RSTD measurement test cases CR

revision of R5-210758

Huawei, HiSilicon 37.571-3 16.6.0 CR#1331 catF NB_IOTenh2-UEConTest Rel-16 R5-90-e

AI: 5.3.12.6

agreed [WTS] [JSN]
R5-211803 Correction of Table 4.1-1 CR

revision of R5-211177

Google Inc. 36.521-2 16.7.0 CR#9551 catF LTE_eMTC4-UEConTest Rel-16 R5-90-e

AI: 5.3.13.3

agreed [WTS] [JSN]
R5-211804 Updating Editors Note in 6.2A.2 and 6.2A.4 for intra-band UL CA CR

revision of R5-210936

Huawei, Hisilicon 38.521-1 16.6.0 CR#11721 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.1

agreed [WTS] [JSN]
R5-211805 Updating general requirements for intra-band non-contiguous CA CR

revision of R5-210917

Huawei, Hisilicon 38.521-1 16.6.0 CR#11591 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.3

agreed [WTS] [JSN]
R5-211806 Addition of 6.5E.2.2.1 CR

revision of R5-210422

Guangdong OPPO Mobile Telecom. 38.521-1 16.6.0 CR#11171 catF 5G_V2X_NRSL_eV2XARC-UEConTest Rel-16 R5-90-e

AI: 5.3.17.4.1

agreed [WTS] [JSN]
R5-211807 Adding test point for Rel-16 DMRS in EVM equalizer spectrum flatness test case CR

revision of R5-210784

Huawei, HiSilicon 38.521-1 16.6.0 CR#11371 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

agreed [WTS] [JSN]
R5-211808 Addition of new test case 6.4C.2.5 EVM equalizer spectrum flatness for half Pi BPSK DMRS for SUL CR

revision of R5-210790

Huawei, HiSilicon 38.521-1 16.6.0 CR#11411 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

agreed [WTS] [JSN]
R5-211809 Adding TP analysis for Rel-16 DMRS in A-MPR test case CR

revision of R5-210783

Huawei, HiSilicon 38.905 16.6.0 CR#3501 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

agreed [WTS] [JSN]
R5-211810 Update of TP analysis for EVM equalizer spectrum flatness for half Pi BPSK CR

revision of R5-210785

Huawei, HiSilicon 38.905 16.6.0 CR#3511 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

agreed [WTS] [JSN]
R5-211811 Update of TP analysis for FR1 SUL test cases CR

revision of R5-210789

Huawei, HiSilicon 38.905 16.6.0 CR#3521 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.

agreed [WTS] [JSN]
R5-211812 Addition of support for BDS B1C signal CR

revision of R5-210054

Spirent Communications, CATT, CAICT 37.571-5 16.3.0 CR#2061 catF B1C_BDS_pos_UEConTest Rel-16 R5-90-e

AI: 5.3.21.3

agreed [WTS] [JSN]
R5-211813 Adding new test case 6.3.2.2.3, 2Rx TDD FR1 Single PMI with 16Tx Type1 - SinglePanel codebook for both SA and NSA CR

revision of R5-211075

Ericsson 38.521-4 16.6.0 CR#2901 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

agreed [WTS] [JSN]
R5-211814 Adding new test case 6.3.3.2.3, 4Rx TDD FR1 Single PMI with 16Tx Type1 - SinglePanel codebook for both SA and NSA CR

revision of R5-211079

Ericsson 38.521-4 16.6.0 CR#2921 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

agreed [WTS] [JSN]
R5-211815 Addition of common ICS in A.4.3.11 for Rel-16 HST CR

revision of R5-210285

CMCC 38.508-2 16.6.0 CR#1421 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.2

agreed [WTS] [JSN]
R5-211816 Update of minimum conformance requirements for 4Rx FDD FR1 PDSCH in TC 5.2.3.1.1_1 CR

revision of R5-210418

LG Electronics 38.521-4 16.6.0 CR#2741 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3

agreed [WTS] [JSN]
R5-211817 Addition of Applicability of different requirements for R16 NR HST in 5.1.1.7 CR

revision of R5-210109

CMCC 38.521-4 16.6.0 CR#2651 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.1

agreed [WTS] [JSN]
R5-211818 Update of Applicability of requirements for mandatory UE features with capability signalling for R16 NR HST in 5.1.1.4 CR

revision of R5-210112

CMCC 38.521-4 16.6.0 CR#2681 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.1

agreed [WTS] [JSN]
R5-211819 Update of Applicability of requirements for optional UE features for R16 NR HST in 5.1.1.3 CR

revision of R5-210113

CMCC 38.521-4 16.6.0 CR#2691 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.1

agreed [WTS] [JSN]
R5-211820 Addition of Abbreviations and References for R16 NR HST in 3.3 and References CR

revision of R5-210108

CMCC 38.521-4 16.6.0 CR#2641 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

agreed [WTS] [JSN]
R5-211821 Addition of HST-DPS Channel Profile in B.3.3 CR

revision of R5-210110

CMCC 38.521-4 16.6.0 CR#2661 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

agreed [WTS] [JSN]
R5-211822 Addition of HST-SFN Channel Profile in B.3.2 CR

revision of R5-210111

CMCC 38.521-4 16.6.0 CR#2671 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

agreed [WTS] [JSN]
R5-211823 Update of Combinations of channel model parameters for R16 NR HST in B.2.2 CR

revision of R5-210114

CMCC 38.521-4 16.6.0 CR#2701 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

agreed [WTS] [JSN]
R5-211824 Update of Reference measurement channels for PDSCH performance requirements for R16 NR HST in A.3.2 CR

revision of R5-210115

CMCC 38.521-4 16.6.0 CR#2711 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

agreed [WTS] [JSN]
R5-211825 Update of Single Tap Channel Profile for R16 NR HST in B.3.1 CR

revision of R5-210116

CMCC 38.521-4 16.6.0 CR#2721 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.3.2

agreed [WTS] [JSN]
R5-211826 LS on minimum requirements for Transmit ON/OFF time mask in UL MIMO FR1 LS out

LS To: TSG WG RAN4

revision of R5-210313

TSG WG RAN5 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.7

approved [WTS] [JSN]
R5-211827 Addition of new test case 6.1.1.7 for R16 NR HST CR

revision of R5-210280

CMCC 38.533 16.6.0 CR#10181 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-211828 Addition of new test case 6.6.1.7 for R16 NR HST CR

revision of R5-210282

CMCC 38.533 16.6.0 CR#10201 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-211829 Addition of cell configuration mapping in Annex E for R16 NR HST CR

revision of R5-210284

CMCC 38.533 16.6.0 CR#10221 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-211830 Correction of the minimum conformance requirements for E-UTRA - NR FR1 Cell reselection 8.2.1.0 CR

revision of R5-211221

Ericsson 38.533 16.6.0 CR#11261 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-211831 Addition of new RRM E-UTRA - NR FR1 Cell reselection test case 8.2.1.2 CR

revision of R5-211222

Ericsson 38.533 16.6.0 CR#11271 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-211832 Correction of the minimum conformance requirements for E-UTRA - NR Inter-RAT event triggered reporting tests 8.4.2.0 CR

revision of R5-211223

Ericsson 38.533 16.6.0 CR#11281 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-211833 Addition of new RRM E-UTRA - NR Inter-RAT event triggered reporting test case 8.4.2.9 CR

revision of R5-211224

Ericsson 38.533 16.6.0 CR#11291 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.5

agreed [WTS] [JSN]
R5-211834 Addition of band 7, 42, 43 and 65 for UE category M1 and NB1 to clause 5 CR

revision of R5-211236

Ericsson 36.521-1 16.7.0 CR#52711 catF LTE_bands_R16_M1_NB1-UEConTest Rel-16 R5-90-e

AI: 5.3.27.2

agreed [WTS] [JSN]
R5-211835 Addition of band 7, 42, 43 and 65 for UE category M1 and NB1 to clause 6 CR

revision of R5-211237

Ericsson 36.521-1 16.7.0 CR#52721 catF LTE_bands_R16_M1_NB1-UEConTest Rel-16 R5-90-e

AI: 5.3.27.2

agreed [WTS] [JSN]
R5-211836 Introduction of test frequencies for n48 adding CBW 70 MHz - DL only CR

revision of R5-211077

Ericsson 38.508-1 16.6.0 CR#17661 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.1

agreed [WTS] [JSN]
R5-211837 Updating MPR testing for SUL band n83 CR

revision of R5-210930

Huawei, Hisilicon 38.521-1 16.6.0 CR#11671 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.3.1

agreed [WTS] [JSN]
R5-211838 Updating AMPR testing for SUL band n83 and n84 CR

revision of R5-210931

Huawei, Hisilicon 38.521-1 16.6.0 CR#11681 catF NR_lic_bands_BW_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.30.3.1

agreed [WTS] [JSN]
R5-211839 Adding PICS for SUL with DL CA configurations CR

revision of R5-210938

Huawei, Hisilicon 38.508-2 16.6.0 CR#1591 catF NR_CADC_NR_LTE_DC_R17-UEConTest Rel-17 R5-90-e

AI: 5.3.31.2

agreed [WTS] [JSN]
R5-211840 Updating Rel-16 EN-DC PC2 MOP to include powerClassNRPart-r16 CR

revision of R5-210746

Huawei, HiSilicon 38.521-3 16.6.0 CR#8781 catF TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

agreed [WTS] [JSN]
R5-211841 Updating Rel-16 EN-DC PC2 MPR to include powerClassNRPart-r16 CR

revision of R5-210747

Huawei, HiSilicon 38.521-3 16.6.0 CR#8791 catF TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

agreed [WTS] [JSN]
R5-211842 Updating Rel-16 EN-DC PC2 A-MPR to include powerClassNRPart-r16 CR

revision of R5-210748

Huawei, HiSilicon 38.521-3 16.6.0 CR#8801 catF TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

agreed [WTS] [JSN]
R5-211843 Updating Rel-16 EN-DC PC2 configured output power to include powerClassNRPart-r16 CR

revision of R5-210749

Huawei, HiSilicon 38.521-3 16.6.0 CR#8811 catF TEI16_Test Rel-16 R5-90-e

AI: 5.4.1

agreed [WTS] [JSN]
R5-211844 Correction of applicability definition for 2Rx related test cases to exclude category 1bis UEs equipped with single Rx antenna CR

revision of R5-210481

CAICT, Spreadtrum Communications 36.521-2 16.7.0 CR#9481 catF TEI13_Test Rel-16 R5-90-e

AI: 5.5.1.3

agreed [WTS] [JSN]
R5-211845 Correct of test applicability for TC with and without UL CA CR

revision of R5-210894

Sporton 36.521-2 16.7.0 CR#9531 catF TEI13_Test Rel-16 R5-90-e

AI: 5.5.1.3

agreed [WTS] [JSN]
R5-211846 Correction of Table A.4.3-3d CR

revision of R5-211180

Google Inc. 36.521-2 16.7.0 CR#9561 catF TEI12_Test Rel-16 R5-90-e

AI: 5.5.1.3

agreed [WTS] [JSN]
R5-211847 Correction of Table number for RRM Radio Link Monitoring Test Cases CR

revision of R5-210891

Sporton 36.521-3 16.7.0 CR#25681 catF TEI8_Test Rel-16 R5-90-e

AI: 5.5.1.4

agreed [WTS] [JSN]
R5-211848 Corrections for support of multiple signals in a GNSS CR

revision of R5-210052

Spirent Communications 37.571-5 16.3.0 CR#2041 catF TEI12_Test Rel-16 R5-90-e

AI: 5.6.11

agreed [WTS] [JSN]
R5-211849 CR to 38.508-2 on larger quiet zone with grey box approach CR

revision of R5-211251

Keysight Technologies UK Ltd 38.508-2 16.6.0 CR#1711 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

withdrawn [WTS] [JSN]
R5-211850 On minimum requirements for Transmit ON/OFF time mask in UL MIMO FR1 discussion

revision of R5-210312

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211851 Correction to NR TC 9.4B.1.1 CR

revision of R5-210871

Huawei, HiSilicon 38.521-4 16.6.0 CR#2871 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.3

withdrawn [WTS] [JSN]
R5-211852 Update for 6.5B.3.3.2 Spurious emission band UE co-existence CR

revision of R5-210987

Qualcomm Korea 38.521-3 16.6.0 CR#8881 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211853 Update to applicability spec for 5G test cases CR

revision of R5-211003

Bureau Veritas, ROHDE & SCHWARZ, TTA, KTL, Ericsson, Huawei, HiSilicon, CAICT, Google Inc., Anritsu 38.522 16.6.0 CR#591 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.8

agreed [WTS] [JSN]
R5-211854 Correction to EN-DC Wideband Intermodulation tests CR

revision of R5-211000

Bureau Veritas, Anritsu 38.521-3 16.6.0 CR#8901 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211855 Updating the value of P-Max for EN-DC and NR SA test cases CR

revision of R5-210949

Huawei, HiSilicon 38.508-1 16.6.0 CR#17581 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

agreed [WTS] [JSN]
R5-211856 Correction to the message contents for CQI reporting tests in 5.4.2.4 CR

revision of R5-211090

Anritsu 38.508-1 16.6.0 CR#17681 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

agreed [WTS] [JSN]
R5-211857 Correction to the message contents for PMI reporting tests in 5.4.2.5 CR

revision of R5-211091

Anritsu 38.508-1 16.6.0 CR#17691 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.1.2

agreed [WTS] [JSN]
R5-211858 Update of UE capabilities for EN-DC configurations CR

revision of R5-210078

China Telecommunications 38.508-2 16.6.0 CR#1401 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-211859 Update of Table A.4.3.2B.2.3.2-2 (DC_1A-8A_n78A, DC_3A-8A_n78A) CR

revision of R5-210353

KT Corp. 38.508-2 16.6.0 CR#1451 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-211860 Update of Table A.4.3.2B.2.3.3-2 (DC_1A-3A-8A_n78A) CR

revision of R5-210354

KT Corp. 38.508-2 16.6.0 CR#1461 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-211861 Introduction of UE capabilities for Rel-15 EN-DC FR1 configurations CR

revision of R5-211035

Ericsson 38.508-2 16.6.0 CR#1611 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-211862 Addition of PICS powerBoosting-pi2BPSK CR

revision of R5-211182

Google Inc. 38.508-2 16.6.0 CR#1651 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-211863 FR2 MPR, ACLR and SEM test cases update as per TP analysis update CR

revision of R5-210547

Keysight Technologies UK Ltd, Ericsson, CAICT 38.521-2 16.6.0 CR#4661 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211864 Cleaning up of FR2 test specification CR

revision of R5-210730

Huawei, HiSilicon 38.521-2 16.6.0 CR#4721 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211865 Update of TX Test Cases for UL MIMO in FR2 CR

revision of R5-210893

Sporton 38.521-2 16.6.0 CR#4751 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211866 Correction to definition of power control window size in FR2 relative power tolerance in TC 6.3.4.3 CR

revision of R5-211095

Anritsu 38.521-2 16.6.0 CR#4821 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211867 FR2 Tx additional spurious emission test case updates CR

revision of R5-211231

Qualcomm Finland RFFE Oy 38.521-2 16.6.0 CR#4911 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211868 ACS FR2 test case update CR

revision of R5-210294

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#4531 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.2

agreed [WTS] [JSN]
R5-211869 IBB FR2 test case update CR

revision of R5-210295

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#4541 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.2

agreed [WTS] [JSN]
R5-211870 Editorial addition of editors notes in 6.3B.8.1.4, 6.3B.8.2.4 and 6.3B.8.3.4 CR

revision of R5-210117

CMCC, Qualcomm, Bureau Veritas, Ericsson, R&S, Huawei, CAICT, Apple 38.521-3 16.6.0 CR#8431 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211871 Correcting EN-DC A-MPR test requirements for non-overlapping test points CR

revision of R5-210736

Huawei, HiSilicon 38.521-3 16.6.0 CR#8751 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211872 Correction to the TDM pattern configuration for EN-DC Tx test cases CR

revision of R5-210951

Huawei, HiSilicon 38.521-3 16.6.0 CR#8861 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211873 Correction to MOP and MPR test procedures for PC2 in TC 6.2B.1.3 and 6.2B.2.1 CR

revision of R5-211100

Anritsu 38.521-3 16.6.0 CR#9181 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.1

agreed [WTS] [JSN]
R5-211874 Correction of LTE frequency for 19-n79 combo in 7.3B.2.3 CR

revision of R5-210299

Keysight Technologies UK Ltd, Ericsson 38.521-3 16.6.0 CR#8451 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211875 Update to EN-DC Reference Sensitivity CR

revision of R5-210517

ROHDE & SCHWARZ 38.521-3 16.6.0 CR#8701 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211876 Update of reference sensitivity for intra-band non-contiguous EN-DC CR

revision of R5-211011

Huawei, HiSilicon 38.521-3 16.6.0 CR#8961 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211877 Update of reference sensitivity for inter-band 2CC EN-DC CR

revision of R5-211012

Huawei, HiSilicon 38.521-3 16.6.0 CR#8971 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211878 Correction to refsens test requirements for DC_1A-7A_n78A CR

revision of R5-211013

Huawei, HiSilicon, Keysight Technologies UK Ltd, Ericsson 38.521-3 16.6.0 CR#8981 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211879 Update of test configuration for inter-band 2CC EN-DC configurations affected by reference sensitivity exceptions CR

revision of R5-211016

Huawei, HiSilicon 38.521-3 16.6.0 CR#9001 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211880 Update of 2CC refsens test case 7.3B.2.3 CR

revision of R5-211137

Ericsson 38.521-3 16.6.0 CR#9241 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211881 Update of 3CC refsens test case 7.3B.2.3_1.1 CR

revision of R5-211138

Ericsson 38.521-3 16.6.0 CR#9251 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211882 Correction of configurations not to be tested in 4CC refsens test case 7.3B.2.3_1.2 CR

revision of R5-211139

Ericsson 38.521-3 16.6.0 CR#9261 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211883 Addition of DC_8A_n77A in test case 7.3B.2.3 CR

revision of R5-211141

Ericsson 38.521-3 16.6.0 CR#9271 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211884 Addition of DC_11A_n79A in test case 7.3B.2.3 CR

revision of R5-211143

Ericsson 38.521-3 16.6.0 CR#9281 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211885 Addition of DC_26A_n41A in test case 7.3B.2.3 CR

revision of R5-211145

Ericsson 38.521-3 16.6.0 CR#9291 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211886 Addition of DC_26A_n77A and DC_26A_n78A in test case 7.3B.2.3 CR

revision of R5-211147

Ericsson 38.521-3 16.6.0 CR#9301 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211887 Addition of DC_26A_n79A in test case 7.3B.2.3 CR

revision of R5-211149

Ericsson 38.521-3 16.6.0 CR#9311 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211888 Addition of DC_41A_n77A and DC_41A_n78A in test case 7.3B.2.3 CR

revision of R5-211151

Ericsson 38.521-3 16.6.0 CR#9321 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.2

agreed [WTS] [JSN]
R5-211889 Update TT results for 6.3.1.1 CR

revision of R5-210450

ROHDE & SCHWARZ 38.533 16.6.0 CR#10361 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.3

agreed [WTS] [JSN]
R5-211890 Update TT results for 6.3.1.1 Annex F CR

revision of R5-210451

ROHDE & SCHWARZ 38.533 16.6.0 CR#10371 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.9.6

agreed [WTS] [JSN]
R5-211891 Updating the value of PLTE for EN-DC test cases CR

revision of R5-210950

Huawei, HiSilicon 36.508 16.7.0 CR#13461 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.

agreed [WTS] [JSN]
R5-211892 Correct 6.3.1.1 TT analysis CR

revision of R5-210449

ROHDE & SCHWARZ 38.903 16.6.0 CR#1981 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211893 Update of test point analysis for FR2 MPR, SEM and ACLR test cases CR

revision of R5-210546

Keysight Technologies UK Ltd, Ericsson, CAICT 38.905 16.6.0 CR#3461 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211894 Addition of reference sensitivity test point analyses for FR1 NR CA and EN-DC CR

revision of R5-210941

Ericsson, Huawei, Hisilicon 38.905 16.6.0 CR#3591 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211895 Moving of principles for reference sensitivity test point selection from attachments to annexes CR

revision of R5-210942

Ericsson 38.905 16.6.0 CR#3601 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211896 TP analysis update for EN_DC refsens CR

revision of R5-211136

Ericsson 38.905 16.6.0 CR#3811 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

withdrawn [WTS] [JSN]
R5-211897 TP analysis for DC_8A_n77A CR

revision of R5-211140

Ericsson 38.905 16.6.0 CR#3821 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211898 TP analysis for DC_11A_n79A CR

revision of R5-211142

Ericsson 38.905 16.6.0 CR#3831 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211899 TP analysis for DC_26A_n41A CR

revision of R5-211144

Ericsson 38.905 16.6.0 CR#3841 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211900 TP analysis for DC_26A_n77A and DC_26A_n78A CR

revision of R5-211146

Ericsson 38.905 16.6.0 CR#3851 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211901 TP analysis for DC_26A_n79A CR

revision of R5-211148

Ericsson 38.905 16.6.0 CR#3861 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211902 TP analysis for DC_41A_n77A and DC_41A_n78A CR

revision of R5-211150

Ericsson 38.905 16.6.0 CR#3871 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-211903 Addition of new test case 6.6.2.2_s A-SEM for sTTI CR

revision of R5-210780

Huawei, HiSilicon 36.521-1 16.7.0 CR#52651 catF LTE_sTTIandPT-UEConTest Rel-16 R5-90-e

AI: 5.3.5.2

agreed [WTS] [JSN]
R5-211904 Updating UE capability for Rel-16 NR inter-band CA configurations for band n1 CR

revision of R5-211248

DOCOMO Communications Lab. 38.508-2 16.6.0 CR#1701 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.2

agreed [WTS] [JSN]
R5-211905 Introduction of DC_1A-28A_n3A to reference sensitivity test CR

revision of R5-211239

Ericsson 38.521-3 16.6.0 CR#9331 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.5.2

agreed [WTS] [JSN]
R5-211906 Reference sensitivity TP analysis for DC_1A-28A_n3A CR

revision of R5-211242

Ericsson 38.905 16.6.0 CR#3901 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211907 Reference sensitivity analysis for DC_3A-7A_n1A CR

revision of R5-211243

Ericsson 38.905 16.6.0 CR#3911 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211908 Reference sensitivity TP analysis for DC_7A-20A_n1A CR

revision of R5-211244

Ericsson 38.905 16.6.0 CR#3921 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211909 Reference sensitivity TP analysis for DC_7A-28A_n3A CR

revision of R5-211245

Ericsson 38.905 16.6.0 CR#3931 catF NR_CADC_NR_LTE_DC_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.7.

agreed [WTS] [JSN]
R5-211910 Adding PICS for UL switching CR

revision of R5-210744

Huawei, HiSilicon 38.508-2 16.6.0 CR#1551 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-211911 Adding NR test case-Time mask for Uplink carriers switching CR

revision of R5-210923

Huawei, Hisilicon 38.521-1 16.6.0 CR#11651 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.1

agreed [WTS] [JSN]
R5-211912 Adding MU and TT for Uplink carriers switching testing CR

revision of R5-210925

Huawei, Hisilicon 38.521-1 16.6.0 CR#11661 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.3.3

agreed [WTS] [JSN]
R5-211913 Adding test applicability for switching test case CR

revision of R5-210745

Huawei, HiSilicon 38.522 16.6.0 CR#571 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.5

agreed [WTS] [JSN]
R5-211914 Adding TP analysis for NR test case-Time mask for UL carrier switching CR

revision of R5-210924

Huawei, Hisilicon 38.905 16.6.0 CR#3581 catF NR_RF_FR1-UEConTest Rel-16 R5-90-e

AI: 5.3.14.8

agreed [WTS] [JSN]
R5-211915 Adding additional TP for half Pi BPSK DMRS to MPR test case for SUL CR

revision of R5-210786

Huawei, HiSilicon 38.521-1 16.6.0 CR#11381 catF NR_eMIMO-UEConTest Rel-16 R5-90-e

AI: 5.3.18.3.1

agreed [WTS] [JSN]
R5-211916 Adding new test case 6.3.2.2.4, 2Rx TDD FR1 Single PMI with 32Tx Type1 - SinglePanel codebook for both SA and NSA CR

revision of R5-211078

Ericsson 38.521-4 16.6.0 CR#2911 catF NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.3.1

agreed [WTS] [JSN]
R5-211917 Addition of new RRM test cases to the applicability table in 4.2 CR

revision of R5-211218

Ericsson 38.522 16.6.0 CR#661 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.4

agreed [WTS] [JSN]
R5-211918 Applicability for RRM NR HST test case 6.1.1.7 and 6.6.1.7 CR

revision of R5-211611

CMCC 38.522 16.6.0 CR#681 catF NR_HST-UEConTest Rel-16 R5-90-e

AI: 5.3.25.4

agreed [WTS] [JSN]
R5-211919 Introduction of FR2 DL 256QAM CR

revision of R5-210082

Nokia, Nokia Shanghai Bell 38.521-2 16.6.0 CR#4511 catF NR_DL256QAM_FR2-UEConTest Rel-16 R5-90-e

AI: 5.3.26.3.2

agreed [WTS] [JSN]
R5-211920 Correction to A-MPR test requirement of NS_22 in TC 6.2.4 CR

revision of R5-211088

Anritsu 36.521-1 16.7.0 CR#52701 catF TEI8_Test Rel-16 R5-90-e

AI: 5.5.1.2.1

agreed [WTS] [JSN]
R5-211921 Correction to ACLR relaxation value in TC 6.5.2.3 CR

revision of R5-211093

Anritsu 38.521-2 16.6.0 CR#4801 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211922 MU and TT definition for REFSENS FR2 CA test cases CR

revision of R5-210296

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#4551 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-211923 Update FR2 MU and TT in 38.521-2 CR

revision of R5-211098

Anritsu 38.521-2 16.6.0 CR#4851 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-211924 CR to 38.521-2 on PC1 Measurement Grid MUs CR

revision of R5-211190

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#4901 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-211925 Update of ETC MTSU CR

revision of R5-211265

ROHDE & SCHWARZ 38.521-2 16.6.0 CR#4921 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.3

agreed [WTS] [JSN]
R5-211926 MU definition for UE MOP for Inter-Band EN-DC including FR2 (3CCs) CR

revision of R5-210305

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#8511 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.3

agreed [WTS] [JSN]
R5-211927 MU and TT defintion for REFSENS EN-DC including FR2 up to 5CCs CR

revision of R5-210306

Keysight Technologies UK Ltd 38.521-3 16.6.0 CR#8521 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.3

agreed [WTS] [JSN]
R5-211928 Update FR2 MU and TT in 38.521-3 CR

revision of R5-211102

Anritsu 38.521-3 16.6.0 CR#9201 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.6.3

agreed [WTS] [JSN]
R5-211929 Update of FR2 demod test cases CR

revision of R5-211260

ROHDE & SCHWARZ 38.521-4 16.6.0 CR#2991 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.7.2

agreed [WTS] [JSN]
R5-211930 Adjacent Channel Selectivity FR2 MU definition in 38.903 CR

revision of R5-210307

Keysight Technologies UK Ltd 38.903 16.6.0 CR#1911 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211931 In-band Blocking FR2 MU definition in 38.903 CR

revision of R5-210308

Keysight Technologies UK Ltd 38.903 16.6.0 CR#1921 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211932 Update on FR2 Blocking Test MU CR

revision of R5-210836

Anritsu 38.903 16.6.0 CR#2081 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211933 Update MU for FR2 RRM CR

revision of R5-210837

Anritsu 38.903 16.6.0 CR#2091 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211934 Update FR2 MU and TT in 38.903 CR

revision of R5-211103

Anritsu 38.903 16.6.0 CR#2151 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211935 CR to 38.903 on ETC Testing CR

revision of R5-211185

Keysight Technologies UK Ltd 38.903 16.6.0 CR#2171 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211936 Update of demod SNR testability CR

revision of R5-211261

ROHDE & SCHWARZ 38.903 16.6.0 CR#2221 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.15

agreed [WTS] [JSN]
R5-211937 Discussion on equal PSD and PCC prioritization for UL CA test discussion

revision of R5-210420

Guangdong OPPO Mobile Telecom. 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211938 Discussion on the uplink power configuration for EN-DC RF cases discussion

revision of R5-210948

Huawei, HiSilicon 5GS_NR_LTE-UEConTest Rel-15 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211939 Discussion on test coverage for reference sensitivity for EN-DC configs with exceptions discussion

revision of R5-211015

Huawei, HiSilicon 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211940 Discussion on test points for EN-DC refsens with exception avoiding discussion

revision of R5-211135

Ericsson 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211941 Discussion on PCC prioritization for FR1 and FR2 UL CA testing discussion

revision of R5-211227

Qualcomm Finland RFFE Oy 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211942 Test case structure updates for CA PDSCH Demodulation test cases discussion

revision of R5-211082

Qualcomm Wireless GmbH NR_perf_enh-UEConTest Rel-16 R5-90-e

AI: 5.3.24.7

noted [WTS] [JSN]
R5-211943 On ACS and IBB FR2 MU definition discussion

revision of R5-210311

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211944 On the QoQZ standard deviation for ETC testing discussion

revision of R5-210557

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211945 On MU for FR2 Blocker Test discussion

revision of R5-210841

Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211946 On FR2 OBW MU discussion

revision of R5-210843

Anritsu R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211947 Input on fading crest factor margin for FR2 Demodulation test cases discussion

revision of R5-211083

Qualcomm Wireless GmbH 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211948 On Additional Spurious emissions discussion

revision of R5-211179

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211949 On Larger Quiet Zone Sizes with Grey Box discussion

revision of R5-211186

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211950 On the achievable SNR for demod test cases discussion

revision of R5-211259

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-90-e

AI: 5.3.2.17

noted [WTS] [JSN]
R5-211951 Discussion about n259 OBW relaxation discussion

revision of R5-210286

DOCOMO Communications Lab. NR_bands_BW_R16-UEConTest Rel-16 R5-90-e

AI: 5.3.11.

noted [WTS] [JSN]

1902 documents (1.1057980060577 seconds)