Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-186400 Agenda - opening session agenda WG Chairman R5-81

AI: 1

noted [WTS] [JSN]
R5-186401 Agenda - mid week session agenda WG Chairman R5-81

AI: 1

noted [WTS] [JSN]
R5-186402 Agenda - closing session agenda WG Chairman R5-81

AI: 1

noted [WTS] [JSN]
R5-186403 RAN5#81 Session Programme agenda WG Chairman R5-81

AI: 2.1

noted [WTS] [JSN]
R5-186404 RAN5 Leadership Team other WG Chairman R5-81

AI: 2.1

noted [WTS] [JSN]
R5-186405 RAN5#80 WG Minutes report

revised to R5-187621

ETSI Secretariat R5-81

AI: 2.1

revised [WTS] [JSN]
R5-186406 RAN5#80 WG Action Points report ETSI Secretariat R5-81

AI: 2.1

noted [WTS] [JSN]
R5-186407 RAN5#3 5G-NR Adhoc Minutes report ETSI Secretariat R5-81

AI: 2.1

approved [WTS] [JSN]
R5-186408 Latest RAN Plenary notes report WG Chairman R5-81

AI: 2.1

noted [WTS] [JSN]
R5-186409 Latest RAN Plenary draft Report report WG Chairman R5-81

AI: 2.1

noted [WTS] [JSN]
R5-186410 Post Plenary Active Work Item update other ETSI Secretariat R5-81

AI: 2.1

noted [WTS] [JSN]
R5-186411 RAN5 SR to RP#81 report WG Chairman R5-81

AI: 2.2

noted [WTS] [JSN]
R5-186412 TF160 SR to RP#81 report WG Chairman R5-81

AI: 2.2

noted [WTS] [JSN]
R5-186413 RAN Chair Report to SA#81 report WG Chairman R5-81

AI: 2.2

noted [WTS] [JSN]
R5-186414 RAN5#81 LS Template other WG Chairman R5-81

AI: 4.3

noted [WTS] [JSN]
R5-186415 RAN5 5GS Text Proposal / pCR cover sheet template other Ericsson R5-81

AI: 4.3

withdrawn [WTS] [JSN]
R5-186416 Meeting schedule for 2019 other

revised to R5-187633

WG Chairman R5-81

AI: 4.4

revised [WTS] [JSN]
R5-186417 WI Progress and Target Completion Date Review other WG Chairman R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186418 Review deadlines for next quarter other

revised to R5-188182

WG Chairman R5-81

AI: 7.6

revised [WTS] [JSN]
R5-186419 Input to TF160 and RAN5 Regarding TTCN Development LS in

source LS: 1893133 Input to TF160 and RAN5 Regarding TTCN Development

PTCRB R5-81

AI: 3

noted [WTS] [JSN]
R5-186420 LS on Joint ETSI - OSA Workshop: Open Implementations & Standardization LS in

source LS: ETSI_CL18_3463

ETSI R5-81

AI: 3

noted [WTS] [JSN]
R5-186421 Carrier Aggregation Optimization LS in

source LS: PVG82_0652_18_LS_to_3GPP_RAN5_on_CA Optimisation_r1

LS reply in R5-188054

PTCRB PVG R5-81

AI: 5.2

noted [WTS] [JSN]
R5-186422 LS on Definition of test methods for OTA unwanted emissions of IMT radio equipment LS in

LS is reply to RP-181520, ITU-R 5D_TD_571Rev1

source LS: RP-182098

TSG RAN R5-81

AI: 3

noted [WTS] [JSN]
R5-186423 Reply LS on LTE OTA TRP and TRS requirements definition in 3GPP LS in

LS is reply to RP-180631

source LS: RP-182148

TSG RAN R5-81

AI: 3

noted [WTS] [JSN]
R5-186424 LS to RAN5 on TM9 FGI bits 103 and 104 LS in

source LS: RP-182175

LS reply in R5-187657

TSG RAN Rel-15 R5-81

AI: 3

noted [WTS] [JSN]
R5-186425 Definition of test methods for Over-The-Air unwanted emissions of IMT radio equipment LS in

source LS: 5D_TD_588Rev2

ITU-R R5-81

AI: 3

noted [WTS] [JSN]
R5-186426 5G/NR UE Conformance Test applicability for 5G S-Modules LS in Global TD-LTE Initiative R5-81

AI: 3

noted [WTS] [JSN]
R5-186427 Update SIB1 CR Ericsson, Huawei, HiSilicon 38.508-1 15.1.0 CR#238 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186428 Addition of new Test Configuration on TC 6.2.2A.2 CR DEKRA 36.521-1 15.3.1 CR#4499 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186429 Addition of new Test Configuration on TC 6.2.3A.2 CR DEKRA 36.521-1 15.3.1 CR#4500 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186430 Addition of new Test Configuration on TC 6.2.3A.2_1 CR DEKRA 36.521-1 15.3.1 CR#4501 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186431 Addition of new Test Configuration on TC 6.2.4A.2 CR DEKRA 36.521-1 15.3.1 CR#4502 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186432 Addition of new Test Configuration on TC 6.2.4A.2_1 CR DEKRA 36.521-1 15.3.1 CR#4503 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-186433 Addition of new Test Configuration on TC 6.2.5A.3 CR DEKRA 36.521-1 15.3.1 CR#4504 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186434 Addition of new Test Configuration on TC 6.3.4A.1.2 CR DEKRA 36.521-1 15.3.1 CR#4505 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186435 Addition of new Test Configuration on TC 6.3.5A.1.2 CR DEKRA 36.521-1 15.3.1 CR#4506 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186436 Addition of new Test Configuration on TC 6.3.5A.3.2 CR DEKRA 36.521-1 15.3.1 CR#4507 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186437 Addition of new Test Configuration on TC 6.5.1A.2 CR DEKRA 36.521-1 15.3.1 CR#4508 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-186438 Addition of new Test Configuration on TC 6.5.2A.1.2 CR DEKRA 36.521-1 15.3.1 CR#4509 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186439 Addition of new Test Configuration on TC 6.5.2A.1.2_1 CR DEKRA 36.521-1 15.3.1 CR#4510 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186440 Addition of new Test Configuration on TC 6.5.2A.2.2 CR DEKRA 36.521-1 15.3.1 CR#4511 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186441 Addition of new Test Configuration on TC 6.5.2A.3.2 CR DEKRA 36.521-1 15.3.1 CR#4512 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186442 Addition of new Test Configuration on TC 6.6.1A.2 CR DEKRA 36.521-1 15.3.1 CR#4513 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186443 Addition of new Test Configuration on TC 6.6.2.1A.2 CR DEKRA 36.521-1 15.3.1 CR#4514 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186444 Addition of new Test Configuration on TC 6.6.2.2A.2_1 CR DEKRA 36.521-1 15.3.1 CR#4515 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186445 Addition of new Test Configuration on TC 6.6.2.2A.2_1 CR DEKRA 36.521-1 15.3.1 CR#4516 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-186446 Addition of new Test Configuration on TC 6.6.2.3A.2 CR DEKRA 36.521-1 15.3.1 CR#4517 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186447 Addition of new Test Configuration on TC 6.6.2.3A.2_1 CR DEKRA, CGC Inc. 36.521-1 15.3.1 CR#4518 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186448 Addition of new Test Configuration on TC 6.6.3.1A.2 CR DEKRA 36.521-1 15.3.1 CR#4519 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186449 Addition of new Test Configuration on TC 6.7A.2 CR DEKRA 36.521-1 15.3.1 CR#4520 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-186450 Addition of test point calculation for BW combination 75-25 in TC 6.2.4A.2 CR DEKRA 36.905 15.2.0 CR#157 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.

agreed [WTS] [JSN]
R5-186451 Discussion paper on Session Timer coverage discussion

revised to R5-187775

ROHDE & SCHWARZ, Intel R5-81

AI: 6.5.6.5

revised [WTS] [JSN]
R5-186452 Corrections to IMS test case G.17.2 CR ROHDE & SCHWARZ 34.229-1 14.4.0 CR#1296 catF TEI11_Test, MTSI_WLAN-UEConTest Rel-14 R5-81

AI: 6.5.6.1

withdrawn [WTS] [JSN]
R5-186453 Updates to clause 4.3.3, physical channel allocations CR Ericsson 38.508-1 15.1.0 CR#239 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186454 TP analysis for test case 6.5.2.4.2 CR Ericsson 38.905 15.0.0 CR#16 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186455 TP analysis for EN-DC test case 6.2B.2.3 CR Ericsson 38.905 15.0.0 CR#17 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186456 Corrections to C.32 and C.32a CR ROHDE & SCHWARZ, Qualcomm Incorporated 34.229-1 14.4.0 CR#1297 catF TEI9_Test Rel-14 R5-81

AI: 6.5.6.1

revised [WTS] [JSN]
R5-186457 Correction to E-UTRA test frequency for intra-band contiguous configuration for band 41 CR Ericsson 38.508-1 15.1.0 CR#240 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-186458 Corrections to EMM test case 9.2.3.1.8b CR ROHDE & SCHWARZ, INTEL 36.523-1 15.3.0 CR#4650 catF TEI11_Test Rel-15 R5-81

AI: 6.4.3.4

agreed [WTS] [JSN]
R5-186459 Corrections to IMS test case 15.25 CR Rohde & Schwarz, Intel, Qualcomm Incorporated 34.229-1 14.4.0 CR#1298 catF TEI8_Test Rel-14 R5-81

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-186460 Update Clause 1 Scope of TS 38.522 CR CMCC 38.522 15.0.0 CR#8 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-186461 Update Clause 3 of TS 38.522 CR CMCC 38.522 15.0.0 CR#9 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-186462 TP for Clause 4.1.1 of TS 38.522 CR CMCC 38.522 15.0.0 CR#10 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-186463 TP for Clause 4.1.2 of TS 38.522 CR CMCC 38.522 15.0.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-186464 TP for Clause 4.1.3 of TS 38.522 CR CMCC 38.522 15.0.0 CR#12 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-186465 Introduction of TC 7.7D Spurious response for UL-MIMO CR CMCC, Huawei 38.521-1 15.0.0 CR#63 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

revised [WTS] [JSN]
R5-186466 Correction to TC 7.7B Spurious response for UL-MIMO CR CMCC 36.521-1 15.3.1 CR#4521 catF TEI15_Test Rel-15 R5-81

AI: 5.4.1.2

revised [WTS] [JSN]
R5-186467 Clarifications on applicability of OIR and TIR CR ROHDE & SCHWARZ 34.229-2 14.4.0 CR#248 catF TEI8_Test Rel-14 R5-81

AI: 6.5.6.2

agreed [WTS] [JSN]
R5-186468 E-UTRA test frequencies for EN-DC intra-band contiguous configurations for band 71 CR Ericsson 38.508-1 15.1.0 CR#241 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186469 Addition to E-UTRA test frequencies for intra-band contiguous configuration for band 41 CR

revised to R5-187722

Ericsson 38.508-1 15.1.0 CR#242 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

revised [WTS] [JSN]
R5-186470 Wordings for Uplink NAS messages CR ROHDE & SCHWARZ, MCC TF160 38.508-1 15.1.0 CR#243 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186471 Impacted 5G NR TSs and clauses by agreed CRs at RAN5#3-5G-NR ad-hoc other Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 2.1

noted [WTS] [JSN]
R5-186472 NB-IoT Band70 In-band frequency for 10Mhz Mid range CR ROHDE & SCHWARZ 36.508 15.3.0 CR#1203 catF TEI13_Test Rel-15 R5-81

AI: 5.4.1.1

agreed [WTS] [JSN]
R5-186473 New NCell for NB-IOT RRM Intra-Freq Cell reselection CR ROHDE & SCHWARZ 36.508 15.3.0 CR#1204 catF TEI13_Test Rel-15 R5-81

AI: 5.4.1.1

agreed [WTS] [JSN]
R5-186474 Chapter 9 RRM Generic CA tests - Anpplicability CR ROHDE & SCHWARZ 36.521-2 15.3.0 CR#769 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.3

withdrawn [WTS] [JSN]
R5-186475 Completion of TC 9.1.69 and 9.1.70 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2290 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-186476 Completion of TC 9.2.56 and 9.2.57 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2291 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-186477 Chapter 9 RRM Generic CA tests - Annexes CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2292 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-186478 Alignment NPRACH configuration (Editorial) CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2293 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-186479 Correction for 4.2.19 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2294 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-186480 Correction for 4.2.24 Cell ID selection procedure CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2295 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-186481 Core spec alignment 4.2.24 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2296 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-186482 Corrections for 7.2.6 and 7.2.7 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2297 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.4

withdrawn [WTS] [JSN]
R5-186483 Correction for 7.3.50 and 7.3.51 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2298 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-186484 Correction for 8.1.28 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2299 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-186485 Removal of reference to H.7.1-2 for RRM 7.3.5x series CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2300 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-186486 Add band group FDD B1 and B2 to RSRQ tests - Rel8 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2301 catF TEI8_Test Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-186487 Add band group FDD B1 and B2 to RSRQ tests - Rel11 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2302 catF TEI11_Test Rel-15 R5-81

AI: 5.4.1.4

revised [WTS] [JSN]
R5-186488 Add band group FDD B1 and B2 to RSRQ tests - Rel12 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2303 catF TEI12_Test Rel-15 R5-81

AI: 5.4.1.4

revised [WTS] [JSN]
R5-186489 Resubmission of CR 0269 CR ROHDE & SCHWARZ 37.571-1 15.3.0 CR#272 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.6

agreed [WTS] [JSN]
R5-186490 Update chapter 4.5 for RF connected procedure CR Ericsson 38.508-1 15.1.0 CR#244 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-186491 Update chapter 4.5 for RF connected procedure CR Ericsson, Keysight Technologies 38.508-1 15.1.0 CR#245 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186492 Update chapter 4.5.4 RRC_CONNECTED CR Ericsson 38.508-1 15.1.0 CR#246 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-186493 Introduction of TC 7.6.4 Narrow-band blocking CR CAICT 38.521-1 15.0.0 CR#64 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

withdrawn [WTS] [JSN]
R5-186494 Introduction of TC 7.7 Spurious response CR CAICT 38.521-1 15.0.0 CR#65 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

withdrawn [WTS] [JSN]
R5-186495 Discussion on test point selection for NR Narrow-band in FR1 discussion CAICT 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-186496 Discussion on test point selection for NR Spurious response in FR1 discussion CAICT 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-186497 CR to TS 38.521-1: pi/2 BPSK on n41 CR CMCC, Huawei 38.521-1 15.0.0 CR#66 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

withdrawn [WTS] [JSN]
R5-186498 Corrections to NAS test case 9.1.5.1.14 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#140 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186499 Default cell configurations for NAS CR ROHDE & SCHWARZ, HiSilicon 38.508-1 15.1.0 CR#247 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186500 Update IE SI-SchedulingInfo CR Ericsson, Huawei, HiSilicon 38.508-1 15.1.0 CR#248 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186501 Applicability rules implementation in 38.522 CR Qualcomm Finland RFFE Oy 38.522 15.0.0 CR#13 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186502 FR2 Spurious Emission test case updates CR Qualcomm Finland RFFE Oy 38.521-2 15.0.0 CR#20 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-186503 FR2 Spurious Emission test case updates CR Qualcomm Finland RFFE Oy 38.521-3 15.0.0 CR#33 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186504 FR2 RefSens test case updates CR Qualcomm Finland RFFE Oy 38.521-2 15.0.0 CR#21 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186505 Update Text on Store Beam Peak Coordinate CR Qualcomm Finland RFFE Oy 38.521-2 15.0.0 CR#22 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186506 Update Text on Store Beam Peak Coordinate CR Qualcomm Finland RFFE Oy 38.521-3 15.0.0 CR#34 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186507 38.521-3 Applicability Rules CR Qualcomm Finland RFFE Oy 38.521-3 15.0.0 CR#35 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186508 FR2 UE and TE radiated connection diagram CR Qualcomm Finland RFFE Oy 38.508-1 15.1.0 CR#249 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186509 FR2 Spurious Emission measurement grids and offset values CR Qualcomm Inc, Anritsu. 38.903 15.0.0 CR#8 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

revised [WTS] [JSN]
R5-186510 Structure updates to Annex C and G CR Qualcomm Finland RFFE Oy 38.521-2 15.0.0 CR#23 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186511 Addition CA 2A2A29A and CA 2A2A29A30A 36.521-2 CR ECIT 36.521-2 14.6.0 CR#770 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-186512 Addition CA 2A2A29A and CA 2A2A29A30A 36.523-2 CR ECIT 36.523-2 14.5.0 CR#1214 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-186513 Addition CA 2A29A66A 36.521-2 CR ECIT 36.521-2 14.6.0 CR#771 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-186514 Addition CA 2A29A66A 36.523-2 CR ECIT 36.523-2 14.5.0 CR#1215 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-186515 Addition CA 2A30A66A66A 36.521-2 CR ECIT 36.521-2 14.6.0 CR#772 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-186516 Addition CA 2A30A66A66A 36.523-2 CR ECIT 36.523-2 14.5.0 CR#1216 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-186517 Addition CA 7A66A and CA 2A7A66A 36.521-2 CR ECIT 36.521-2 14.6.0 CR#773 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-186518 Addition CA 7A66A and CA 2A7A66A 36.523-2 CR ECIT 36.523-2 14.5.0 CR#1217 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-186519 Addition CA combination 36.521-1_CA_2A-2A-29A and CA_2A-2A-29A-30A CR ECIT 36.521-1 14.6.0 CR#4522 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-186520 Addition CA combination 36.521-1_CA_2A-29A-66A CR ECIT 36.521-1 14.6.0 CR#4523 catF LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-186521 Addition CA 2A2A7A and CA 2A2A7A66A 36.521-2 CR ECIT, CAICT 36.521-2 15.3.0 CR#774 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

revised [WTS] [JSN]
R5-186522 Addition CA 2A2A7A and CA 2A2A7A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#1218 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

revised [WTS] [JSN]
R5-186523 Addition CA 2A2A14A and CA 2A2A14A30A and CA 2A2A14A66A and CA 2A2A14A30A66A 36.521-2 CR ECIT, CAICT 36.521-2 15.3.0 CR#775 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

revised [WTS] [JSN]
R5-186524 Addition CA 2A2A14A and CA 2A2A14A30A and CA 2A2A14A66A and CA 2A2A14A30A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#1219 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

revised [WTS] [JSN]
R5-186525 Addition CA 2A12A30A66A66A 36.521-2 CR ECIT, CAICT 36.521-2 15.3.0 CR#776 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

revised [WTS] [JSN]
R5-186526 Addition CA 2A12A30A66A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#1220 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

revised [WTS] [JSN]
R5-186527 CA 2A14A30A66A66A 36.521-2 CR ECIT, CAICT 36.521-2 15.3.0 CR#777 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

revised [WTS] [JSN]
R5-186528 Addition CA 2A14A30A66A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#1221 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

revised [WTS] [JSN]
R5-186529 Addition CA 2A14A66A66A and CA 2A2A14A66A66A 36.521-2 CR ECIT, CAICT 36.521-2 15.3.0 CR#778 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

revised [WTS] [JSN]
R5-186530 Addition CA 2A14A66A66A and CA 2A2A14A66A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#1222 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

revised [WTS] [JSN]
R5-186531 Addition CA 2A29A30A66A 36.521-2 CR ECIT, CAICT 36.521-2 15.3.0 CR#779 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

revised [WTS] [JSN]
R5-186532 Addition CA 2A29A30A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#1223 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

revised [WTS] [JSN]
R5-186533 Addition CA combination 36.521-1_CA_2A-12A-30A-66A-66A CR ECIT 36.521-1 15.3.1 CR#4524 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

withdrawn [WTS] [JSN]
R5-186534 Addition CA combination 36.521-1_CA_2A-29A-30A-66A CR ECIT 36.521-1 15.3.1 CR#4525 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

withdrawn [WTS] [JSN]
R5-186535 Addition CA 2A2A29A and CA 2A2A29A30A 36.521-2 CR ECIT 36.521-2 15.3.0 CR#780 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

revised [WTS] [JSN]
R5-186536 Addition CA 2A2A29A and CA 2A2A29A30A 36.523-2 CR ECIT 36.523-2 15.3.0 CR#1224 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 6.3.4.3

revised [WTS] [JSN]
R5-186537 Addition CA 2A29A66A 36.521-2 CR ECIT 36.521-2 15.3.0 CR#781 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

revised [WTS] [JSN]
R5-186538 Addition CA 2A29A66A 36.523-2 CR ECIT 36.523-2 15.3.0 CR#1225 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 6.3.4.3

revised [WTS] [JSN]
R5-186539 Addition CA 2A30A66A66A 36.521-2 CR ECIT 36.521-2 15.3.0 CR#782 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

revised [WTS] [JSN]
R5-186540 Addition CA 2A30A66A66A 36.523-2 CR ECIT 36.523-2 15.3.0 CR#1226 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 6.3.4.3

revised [WTS] [JSN]
R5-186541 Addition CA 7A66A and CA 2A7A66A 36.521-2 CR ECIT 36.521-2 15.3.0 CR#783 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

revised [WTS] [JSN]
R5-186542 Addition CA 7A66A and CA 2A7A66A 36.523-2 CR ECIT 36.523-2 15.3.0 CR#1227 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 6.3.4.3

revised [WTS] [JSN]
R5-186543 Addition CA combination 36.521-1_CA_2A-2A-29A and CA_2A-2A-29A-30A CR ECIT 36.521-1 15.3.1 CR#4526 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-186544 Addition CA combination 36.521-1_CA_2A-29A-66A CR ECIT 36.521-1 15.3.1 CR#4527 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-186545 Update chapter 4.5.4 RRC_CONNECTED CR Ericsson 38.508-1 15.1.0 CR#250 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186546 Correction of RRM IncMon TC 4.2.10 CR Ericsson 36.521-3 15.3.0 CR#2304 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186547 Correction of RRM IncMon TC 4.2.11 CR Ericsson 36.521-3 15.3.0 CR#2305 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186548 Correction of RRM IncMon TC 4.3.1.5 CR Ericsson 36.521-3 15.3.0 CR#2306 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186549 Correction of RRM IncMon TC 4.3.2A CR Ericsson 36.521-3 15.3.0 CR#2307 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186550 Correction of RRM IncMon TC 4.3.3A CR Ericsson 36.521-3 15.3.0 CR#2308 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186551 Correction of RRM IncMon TC 4.3.4.4 CR Ericsson 36.521-3 15.3.0 CR#2309 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186552 Correction of RRM IncMon TC 8.4.8 CR Ericsson 36.521-3 15.3.0 CR#2310 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186553 Correction of RRM IncMon TC 8.4.9 CR Ericsson 36.521-3 15.3.0 CR#2311 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186554 Correction of RRM IncMon TC 8.5.8 CR Ericsson 36.521-3 15.3.0 CR#2312 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186555 Correction of RRM IncMon TC 8.6.3 CR Ericsson 36.521-3 15.3.0 CR#2313 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186556 Correction of RRM IncMon TC 8.7.5 CR Ericsson 36.521-3 15.3.0 CR#2314 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186557 Correction of RRM IncMon TC 8.7A.1 CR Ericsson 36.521-3 15.3.0 CR#2315 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186558 Definition of additional cells for IncMon RRM Test Cases CR Ericsson 36.508 15.3.0 CR#1205 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.4

revised [WTS] [JSN]
R5-186559 Message content for IncMon RRM Test Cases CR Ericsson 36.508 15.3.0 CR#1206 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.4

revised [WTS] [JSN]
R5-186560 Applicability for IncMon RRM Test Cases CR Ericsson, CGC Inc. 36.521-2 15.3.0 CR#784 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.5

revised [WTS] [JSN]
R5-186561 Cell Configuration for IncMon RRM Test Cases CR Ericsson 36.521-3 15.3.0 CR#2316 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186562 New rows in Annex F tables for IncMon RRM Test Cases CR Ericsson 36.521-3 15.3.0 CR#2317 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

revised [WTS] [JSN]
R5-186563 Updates of MU in TS 38.521-1 Annex F during RAN5#81 CR

revised to R5-187908

NTT DOCOMO, INC. 38.521-1 15.0.0 CR#67 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

revised [WTS] [JSN]
R5-186564 Updates of TT in TS 38.521-1 Annex F during RAN5#81 CR

revised to R5-187909

NTT DOCOMO, INC. 38.521-1 15.0.0 CR#68 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

revised [WTS] [JSN]
R5-186565 Updates of MU in TS 38.521-2 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#24 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-186566 Updates of TT in TS 38.521-2 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#25 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-186567 Updates of MU in TS 38.521-3 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-3 15.0.0 CR#36 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

revised [WTS] [JSN]
R5-186568 Updates of TT in TS 38.521-3 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-3 15.0.0 CR#37 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

revised [WTS] [JSN]
R5-186569 Editorial_Cleaning up for description of test requirement in clause 6 CR NTT DOCOMO, INC. 38.521-1 15.0.0 CR#69 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-186570 Editorial_Cleaning up for description of test requirement in clause 7 CR NTT DOCOMO, INC. 38.521-1 15.0.0 CR#70 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

withdrawn [WTS] [JSN]
R5-186571 Update Clause 7.5B.3 in TS 38.521-3 CR CMCC 38.521-3 15.0.0 CR#38 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

revised [WTS] [JSN]
R5-186572 New NAS test case 9.1.3.1 CR

revised to R5-187708

ROHDE & SCHWARZ 38.523-1 15.1.0 CR#141 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186573 New NAS test case 9.1.5.1.2 CR

revised to R5-188150

ROHDE & SCHWARZ 38.523-1 15.1.0 CR#142 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186574 New NAS test case 9.1.6.1.4 CR

revised to R5-188151

ROHDE & SCHWARZ 38.523-1 15.1.0 CR#143 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186575 Update IE ServingCellConfig CR Ericsson 38.508-1 15.1.0 CR#251 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186576 Addition of applicability for NAS test case 9.1.5.1.14 CR ROHDE & SCHWARZ 38.523-2 15.1.0 CR#14 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-186577 Addition of applicability for new NAS test case 9.1.3.1 CR ROHDE & SCHWARZ 38.523-2 15.1.0 CR#15 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-186578 Addition of applicability for new NAS test case 9.1.5.1.2 CR ROHDE & SCHWARZ 38.523-2 15.1.0 CR#16 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-186579 Addition of applicability for new NAS test case 9.1.6.1.4 CR ROHDE & SCHWARZ 38.523-2 15.1.0 CR#17 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-186580 Update NB-IOT Spurious Emission UE co-existence CR Huawei, HiSilicon 36.521-1 15.3.1 CR#4528 catF TEI13_Test Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-186581 Update the general sections for Rel-14 NB-IOT (Editorial) CR CMCC, Huawei, HiSilicon 36.521-1 15.3.1 CR#4529 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.3

revised [WTS] [JSN]
R5-186582 Update the 6.2.3FA to reduce test points CR Huawei, HiSilicon, CMCC 36.521-1 15.3.1 CR#4530 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.3

agreed [WTS] [JSN]
R5-186583 Update Rel-14 NB-IOT Tx test cases to support category NB2 CR Huawei, HiSilicon, CAICT, CMCC 36.521-1 15.3.1 CR#4531 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.3

agreed [WTS] [JSN]
R5-186584 Update Rel-14 NB-IOT Rx test cases to support category NB2 CR Huawei, HiSilicon, CMCC 36.521-1 15.3.1 CR#4532 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.3

agreed [WTS] [JSN]
R5-186585 Update the test applicability for Rel-14 NB-IOT RF test cases CR Huawei, HiSilicon, CAICT, CMCC 36.521-2 15.3.0 CR#785 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.4

agreed [WTS] [JSN]
R5-186586 Update the test applicability for Rel-14 NB-IOT RRM test cases CR Huawei, HiSilicon, CMCC 36.521-2 15.3.0 CR#786 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.4

agreed [WTS] [JSN]
R5-186587 Update Rel-14 NB-IOT RRM test cases to support category NB2 CR CMCC, Huawei, HiSilicon 36.521-3 15.3.0 CR#2318 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.5

revised [WTS] [JSN]
R5-186588 Update 8.1.2.2 Definition of CA capability for 4DL and 5DL CA CR Huawei, HiSilicon 36.521-1 15.3.1 CR#4533 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-186589 Update 4DL and 5DL performance test cases (Editorial) CR Huawei, HiSilicon 36.521-1 15.3.1 CR#4534 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-186590 Addition of Statistic information for 4DL and 5DL test cases CR Huawei, HiSilicon, Bureau Veritas, SGS 36.521-1 15.3.1 CR#4535 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-186591 Addition of new CA configurations into 36.521-2 CR Huawei, HiSilicon 36.521-2 15.3.0 CR#787 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

agreed [WTS] [JSN]
R5-186592 Update the test applicability of TDD 4DL and 5DL CA performance test cases CR Huawei, HiSilicon 36.521-2 15.3.0 CR#788 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-186593 Update 8.16.78 to add TT information CR Huawei, HiSilicon 36.521-3 15.3.0 CR#2319 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.4

revised [WTS] [JSN]
R5-186594 Addition of new CA configurations into 36.523-2 CR Huawei, HiSilicon 36.523-2 15.3.0 CR#1228 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 6.3.4.3

agreed [WTS] [JSN]
R5-186595 WP - Support for V2X services Work Plan Huawei LTE_V2X-UEConTest Rel-14 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186596 SR - Support for V2X services WI status report Huawei LTE_V2X-UEConTest Rel-14 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186597 WP - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell Work Plan Huawei LTE_CA_enh_b5C_PUCCH-UEConTest Rel-13 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186598 SR - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell WI status report Huawei LTE_CA_enh_b5C_PUCCH-UEConTest Rel-13 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186599 WP - Rel-14 eNB-IoT Work Plan Huawei NB_IOTenh-UEConTest Rel-14 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186600 SR - Rel-14 eNB-IoT WI status report Huawei NB_IOTenh-UEConTest Rel-14 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186601 5G NR_EN_DC with FR1_Text update for Intra-Band Contiguous RX sensitivity CR Qualcomm inc. 38.521-3 15.0.0 CR#39 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186602 5G NR_Text update for TX spurious emission intra-band contiguous EN-DC CR Qualcomm Inc. 38.521-3 15.0.0 CR#40 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186603 5G_FR1 Text update for 7.3A Reference sensitivity for CA CR Qualcomm Inc. 38.521-1 15.0.0 CR#71 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

revised [WTS] [JSN]
R5-186604 5G_FR1 Text update for 7.3 Reference sensitivity CR Qualcomm Inc. 38.521-1 15.0.0 CR#72 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186605 5R_FR1 Text Update for 6.5.3.1_General spurious emissions CR Qualcomm Inc 38.521-1 15.0.0 CR#73 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186606 5R FR1 Text Update for 6.5.3.2 Spurious emission for UE co-existence CR Qualcomm Inc 38.521-1 15.0.0 CR#74 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186607 5G NR_EN_DC with FR1_Text update for Inter-Band RX sensitivity CR Qualcomm Inc 38.521-3 15.0.0 CR#41 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

revised [WTS] [JSN]
R5-186608 Spurious emission band UE co-existence for Inter-band EN-DC within FR1 CR Qualcomm Inc 38.521-3 15.0.0 CR#42 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186609 TP_analysis for TX spurious emission UE co-existence for intra-band contiguous EN-DC with FR1 CR Qualcomm Inc 38.905 15.0.0 CR#18 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186610 TP analysis for Reference sensitivity for Intra-band Contiguous EN-DC with FR1 CR Qualcomm Inc 38.905 15.0.0 CR#19 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186611 TP analysis for Reference sensitivity for Inter-band EN-DC with FR1 CR Qualcomm Inc 38.905 15.0.0 CR#20 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186612 Add CounterCheck CR Ericsson 38.508-1 15.1.0 CR#252 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186613 Update DLInformationTransfer CR Ericsson 38.508-1 15.1.0 CR#253 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186614 Correction to applicability of A-GNSS tests for Category M1 and M2 UEs CR Spirent Communications, European Commission 37.571-1 15.3.0 CR#273 catF TEI13_Test Rel-15 R5-81

AI: 5.5.9

withdrawn [WTS] [JSN]
R5-186615 Clarification of the meaning of A-GPS CR Spirent Communications 37.571-1 15.3.0 CR#274 catF TEI9_Test Rel-15 R5-81

AI: 5.5.9

agreed [WTS] [JSN]
R5-186616 Addition of two missing triple-GNSS test cases CR Spirent Communications, European Commission 37.571-1 15.3.0 CR#275 catF TEI12_Test Rel-15 R5-81

AI: 5.5.9

agreed [WTS] [JSN]
R5-186617 Updates to Table 4B.2-1 CR Spirent Communications, European Commission 37.571-1 15.3.0 CR#276 catF TEI15_Test Rel-15 R5-81

AI: 5.5.9

agreed [WTS] [JSN]
R5-186618 Addition of NR background information CR Spirent Communications, European Commission 37.571-2 15.3.0 CR#109 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.15

agreed [WTS] [JSN]
R5-186619 Addition of applicabilities for two missing Minimum Performance triple-GNSS test cases CR Spirent Communications, European Commission 37.571-3 15.3.0 CR#100 catF TEI12_Test Rel-15 R5-81

AI: 5.5.

agreed [WTS] [JSN]
R5-186620 Correction to applicabilities of Modernized GPS for Minimum Performance test cases CR Spirent Communications 37.571-3 15.3.0 CR#101 catF TEI9_Test Rel-15 R5-81

AI: 5.5.

agreed [WTS] [JSN]
R5-186621 Addition of Category NB2 information CR Spirent Communications 37.571-3 15.3.0 CR#102 catF TEI13_Test Rel-15 R5-81

AI: 5.5.

agreed [WTS] [JSN]
R5-186622 Addition of PICs for support of Acquisition Assistance for Galileo E5A and GPS L5 signals CR Spirent Communications, European Commission 37.571-3 15.3.0 CR#103 catF TEI9_Test Rel-15 R5-81

AI: 6.5.7.2

agreed [WTS] [JSN]
R5-186623 Addition of NR signalling background information CR Spirent Communications, European Commission 37.571-3 15.3.0 CR#104 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.16

agreed [WTS] [JSN]
R5-186624 Correction of implementation errors from R5-184028 CR Spirent Communications 37.571-5 15.3.0 CR#186 catF TEI15_Test Rel-15 R5-81

AI: 5.5.11

agreed [WTS] [JSN]
R5-186625 Correction of GNSS-IonosphericModel sub-tests list CR Spirent Communications, European Commission 37.571-5 15.3.0 CR#187 catF TEI9_Test Rel-15 R5-81

AI: 5.5.11

agreed [WTS] [JSN]
R5-186626 Clarification of notes for Galileo signal information CR Spirent Communications, European Commission 37.571-5 15.3.0 CR#188 catF TEI12_Test Rel-15 R5-81

AI: 5.5.11

agreed [WTS] [JSN]
R5-186627 Clarification of use of Modernized GPS for Minimum Performance test cases CR Spirent Communications 37.571-5 15.3.0 CR#189 catF TEI9_Test Rel-15 R5-81

AI: 5.5.11

agreed [WTS] [JSN]
R5-186628 Clarification of use of Assistance Data for Galileo and Modernized GPS signalling test cases CR Spirent Communications, European Commission 37.571-5 15.3.0 CR#190 catF TEI9_Test Rel-15 R5-81

AI: 6.5.7.4

agreed [WTS] [JSN]
R5-186629 Addition of information for two missing Minimum Performance triple-GNSS test cases CR Spirent Communications, European Commission 37.571-5 15.3.0 CR#191 catF TEI12_Test Rel-15 R5-81

AI: 5.5.11

agreed [WTS] [JSN]
R5-186630 Addition of NR signalling background information CR Spirent Communications, European Commission 37.571-5 15.3.0 CR#192 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.18

agreed [WTS] [JSN]
R5-186631 Correction to GNSS scenario #3 for V2X test cases CR Spirent Communications, European Commission 36.508 15.3.0 CR#1207 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.1

agreed [WTS] [JSN]
R5-186632 Correction to values for GNSS scenario #3 for V2X test cases CR Spirent Communications, European Commission 36.523-1 15.3.0 CR#4651 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.3

agreed [WTS] [JSN]
R5-186633 Update IE SchedulingRequestResourceConfig CR Ericsson, MCC TF160 38.508-1 15.1.0 CR#254 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-186634 Addition of new 5GC TC 9.1.5.1.10 CR

revised to R5-188152

CAICT 38.523-1 15.1.0 CR#144 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186635 Addition of new 5GC TC 9.1.5.1.11 CR

revised to R5-188153

CAICT 38.523-1 15.1.0 CR#145 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186636 Addition of new 5GC TC 9.1.8.14 CR CAICT 38.523-1 15.1.0 CR#146 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186637 Addition of new 5GC TC 9.1.8.18 CR CAICT 38.523-1 15.1.0 CR#147 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186638 Addition of new 5GC TC 10.1.3.4 CR

revised to R5-188168

CAICT 38.523-1 15.1.0 CR#148 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-186639 Addition of new 5GC TC 10.1.3.5 CR

revised to R5-188169

CAICT 38.523-1 15.1.0 CR#149 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-186640 Addition of new 5GC TC 10.1.3.6 CR

revised to R5-188170

CAICT 38.523-1 15.1.0 CR#150 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-186641 Update IE SchedulingRequestResourceConfig CR Ericsson, MCC TF160 38.508-1 15.1.0 CR#255 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186642 Addition of new 5GC TC 10.1.3.7 CR

revised to R5-188171

CAICT 38.523-1 15.1.0 CR#151 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-186643 Update IE RadioBearerConfig CR Ericsson 38.508-1 15.1.0 CR#256 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-186644 Addition of new 5GC TC 10.1.3.8 CR

revised to R5-188172

CAICT 38.523-1 15.1.0 CR#152 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-186645 Addition of new 5GC TC 10.1.6.1 CR

revised to R5-188173

CAICT 38.523-1 15.1.0 CR#153 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-186646 Addition of new 5GC TC 10.1.6.2 CR

revised to R5-188174

CAICT 38.523-1 15.1.0 CR#154 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-186647 Addition of new 5GC TC 10.1.6.3 CR

revised to R5-188175

CAICT 38.523-1 15.1.0 CR#155 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-186648 Correction to NR RLC test case 7.1.2.3.3 and 7.1.2.3.4 CR ANRITSU LTD 38.523-1 15.1.0 CR#156 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-186649 Correction to NR PDCP test case 7.1.3.5.1 CR ANRITSU LTD 38.523-1 15.1.0 CR#157 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186650 Correction to NR PDCP test case 7.1.3.5.2 CR ANRITSU LTD 38.523-1 15.1.0 CR#158 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.4

agreed [WTS] [JSN]
R5-186651 Correction to Signal levels for conducted testing CR ANRITSU LTD 38.508-1 15.1.0 CR#257 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186652 Correction to NR RRC test case 8.2.3.5.1 CR ANRITSU LTD 38.523-1 15.1.0 CR#159 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-186653 Correction to NR RRC test case 8.2.3.9.1 and 8.2.3.10.1 CR ANRITSU LTD 38.523-1 15.1.0 CR#160 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-186654 Addition of 6.3D.4.1 Absolute Power tolerance for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#75 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-186655 Addition of 6.3D.4.2 Relative Power Tolerance for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#76 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-186656 Addition of 6.3D.4.3 Aggregate Power tolerance for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#77 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-186657 New WID on UE Conformance Test Aspects - Bluetooth/WLAN measurement collection in LTE Minimization of Drive Tests (MDT) WID new

revised to R5-187627

CMCC Rel-15 R5-81

AI: 4.1

revised [WTS] [JSN]
R5-186658 Addition of 5GC Test case 10.1.4.1 CR

revised to R5-188176

ANRITSU LTD 38.523-1 15.1.0 CR#161 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-186659 Add applicability for 5GC test case 10.1.4.1 CR ANRITSU LTD 38.523-2 15.1.0 CR#18 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-186660 Introduction of the support of ProSe for B72 CR Airbus DS SLC 36.521-1 15.3.1 CR#4536 catF LTE450_B72_Europe_ProSe-UEConTest Rel-15 R5-81

AI: 5.3.20.2

revised [WTS] [JSN]
R5-186661 Introduction of the support of ProSe for B72 CR Airbus DS SLC 36.508 15.3.0 CR#1208 catF LTE450_B72_Europe_ProSe-UEConTest Rel-15 R5-81

AI: 5.3.20.1

revised [WTS] [JSN]
R5-186662 Revised WID on UE Conformance Test Aspects - ProSe Support for Band 72 in LTE WID revised Airbus DS SLC LTE450_B72_Europe_ProSe-UEConTest Rel-15 R5-81

AI: 7.4.2

endorsed [WTS] [JSN]
R5-186663 Updates to test case 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC CR Ericsson 38.521-3 15.0.0 CR#43 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-186664 Introduction of B68 in ProSe test frequencies table CR Airbus DS SLC 36.508 15.3.0 CR#1209 catF LTE700_Europe_PPDR-UEConTest, TEI15_Test Rel-15 R5-81

AI: 5.4.1.1

revised [WTS] [JSN]
R5-186665 Update LocationMeasurementIndication CR Ericsson 38.508-1 15.1.0 CR#258 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186666 Update MeasurementReport CR Ericsson 38.508-1 15.1.0 CR#259 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186667 Introduction of Power Class 1 for B31 and B72 CR Airbus DS SLC 36.521-1 15.3.1 CR#4537 catF LTE_PC1_B31_B72-UEConTest Rel-15 R5-81

AI: 5.3.19.1

revised [WTS] [JSN]
R5-186668 Update chapter 4.5.2 RRC_IDLE CR

revised to R5-187663

Ericsson 38.508-1 15.1.0 CR#260 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186669 Introduction of Power Class 1 for B31 and B72 CR Airbus DS SLC 36.521-2 15.3.0 CR#789 catF LTE_PC1_B31_B72-UEConTest Rel-15 R5-81

AI: 5.3.19.2

revised [WTS] [JSN]
R5-186670 Updating test case 6.2.3 UE additional maximum output power reduction CR Ericsson-LG Co., LTD 38.521-1 15.0.0 CR#78 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186671 Updating test case 6.5.2.3 Additional spectrum emission mask CR Ericsson-LG Co., LTD 38.521-1 15.0.0 CR#79 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186672 Updating test case 6.2B.3.1 Additional Maximum Output Power reduction for Intra-band contiguous EN-DC CR Ericsson-LG Co., LTD 38.521-3 15.0.0 CR#44 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186673 Updating test case 6.5B.2.1.2 Additional spectrum emissions mask for intra-band contiguous EN-DC CR Ericsson-LG Co., LTD 38.521-3 15.0.0 CR#45 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186674 Test point analysis for AMPR Intra-band contiguous EN-DC in FR1 for NS_35 CR Ericsson-LG Co., LTD 38.905 15.0.0 CR#21 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186675 Updating test case 6.2.3 maximum output power with additional requirements CR Ericsson-LG Co., LTD 38.521-2 15.0.0 CR#26 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186676 Correction to NR MAC DRX test cases 7.1.5.1.1 and 7.1.5.1.2 CR ANRITSU LTD 38.523-1 15.1.0 CR#162 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-186677 Resubmission of update to 38.508 for mid channel bandwidth CR Qualcomm Finland RFFE Oy 38.508-1 15.1.0 CR#261 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186678 new TC for PDSCH FR1 demod pCR

revised to R5-188006

Qualcomm Finland RFFE Oy 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

revised [WTS] [JSN]
R5-186679 Corrections to PDCP test case 7.1.3.5.3 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#163 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.4

agreed [WTS] [JSN]
R5-186680 Update of test case 6.5.2.4.2, UTRA ACLR in 38.521-1 CR Ericsson 38.521-1 15.0.0 CR#80 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186681 Updates to EN-DC test case 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC CR Ericsson 38.521-3 15.0.0 CR#46 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186682 Update MobilityFromNRCommand CR Ericsson 38.508-1 15.1.0 CR#262 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186683 Updates to EN-DC test case 6.2B.2.2, UE Maximum Output Power reduction for Intra-Band Non-Contiguous EN-DC CR Ericsson 38.521-1 15.0.0 CR#81 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

withdrawn [WTS] [JSN]
R5-186684 Updates to test case 6.2B.2.3, UE Maximum Output Power reduction for Inter-Band EN-DC within FR1 CR Ericsson 38.521-3 15.0.0 CR#47 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186685 Addition of new 5GC TC 9.1.6.1.6 CR

revised to R5-188154

MediaTek Inc. 38.523-1 15.1.0 CR#164 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186686 Addition of new 5GC TC 9.1.6.1.7 CR MediaTek Inc. 38.523-1 15.1.0 CR#165 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186687 Addition of new 5GC TC 9.1.6.2.8 CR

revised to R5-188155

MediaTek Inc. 38.523-1 15.1.0 CR#166 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186688 Add applicability of 5GC TC 9.1.6.1.6, 9.1.6.1.7, 9.1.6.2.8 and 9.1.6.2.10 CR MediaTek Inc. 38.523-2 15.1.0 CR#19 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-186689 Correction to various Radio resource control IEs CR ANRITSU LTD 38.508-1 15.1.0 CR#263 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186690 Addition of B72 for test cases with 5MHz channel bandwidth CR Airbus DS SLC 36.521-3 15.3.0 CR#2320 catF LTE450_Europe_PPDR-UEConTest, TEI15_Test Rel-15 R5-81

AI: 5.4.1.4

revised [WTS] [JSN]
R5-186691 Update Paging CR Ericsson 38.508-1 15.1.0 CR#264 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186692 Update RRCReestablishment CR Ericsson 38.508-1 15.1.0 CR#265 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186693 Update of V2X EVM TCs CR CAICT, Huawei 36.521-1 15.3.1 CR#4538 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.3

agreed [WTS] [JSN]
R5-186694 Update RRCReconfiguration CR Ericsson 38.508-1 15.1.0 CR#266 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-186695 Addition of Rel-12 missing IEs to LPP message contents CR ROHDE & SCHWARZ 37.571-2 15.3.0 CR#110 catF TEI12_Test Rel-15 R5-81

AI: 6.5.7.1

agreed [WTS] [JSN]
R5-186696 Addition of Rel-15 missing IEs to LPP message contents CR ROHDE & SCHWARZ 37.571-2 15.3.0 CR#111 catF TEI15_Test Rel-15 R5-81

AI: 6.5.7.1

agreed [WTS] [JSN]
R5-186697 Positioning NSA Protocol tests - LPP Procedures CR ROHDE & SCHWARZ 37.571-2 15.3.0 CR#112 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.15

revised [WTS] [JSN]
R5-186698 Handling of power on / power off cycles and UE Automation in RRM and SIG testing for FR2 discussion

revised to R5-187721

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 4.5.3

revised [WTS] [JSN]
R5-186699 On RRM test case numbering discussion

revised to R5-187995

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-186700 On RRM FR1 MU and TT analysis discussion

revised to R5-188003

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-186701 On TS 38.533 Annex Structure discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-186702 Resubmission of R5-186252 with modifications pCR

revised to R5-187847

ROHDE & SCHWARZ 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-186703 TP on new RRM 5G Test Cases 4.7.1.1 and 4.7.1.2 pCR

revised to R5-188002

ROHDE & SCHWARZ 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-186704 TP on new RRM 5G Test Cases 6.7.1.1 and 6.7.1.2 pCR

revised to R5-187996

ROHDE & SCHWARZ 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-186705 TP on Annexes for TS 38.533 pCR

revised to R5-188005

ROHDE & SCHWARZ 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-186706 TP on references and common sections for TS 38.533 pCR ROHDE & SCHWARZ 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-186707 Draft TS 38.533 v0.0.3 draft TS ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 7.5

withdrawn [WTS] [JSN]
R5-186708 Adding test case 6.2B.2.4, UE Maximum Output Power reduction for Inter-Band EN-DC including FR2 CR Ericsson 38.521-3 15.0.0 CR#48 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-186709 Introduction of FR1 7.4 Maximum input level CR CAICT, Huawei 38.521-1 15.0.0 CR#82 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

revised [WTS] [JSN]
R5-186710 TP analysis for test case 6.2B.2.4, UE Maximum Output Power reduction for Inter-Band EN-DC including FR2 CR Ericsson 38.905 15.0.0 CR#22 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-186711 5GS conditions discussion Ericsson R5-81

AI: 6.3.9.19

noted [WTS] [JSN]
R5-186712 Test Point analysis for FR1 7.4 Maximum input level CR CAICT, Huawei 38.905 15.0.0 CR#23 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

revised [WTS] [JSN]
R5-186713 Test Point analysis for FR1 MPR test case CR CAICT, Huawei 38.905 15.0.0 CR#24 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

revised [WTS] [JSN]
R5-186714 Update RRCReject CR Ericsson 38.508-1 15.1.0 CR#267 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186715 MCC TF160 Status Report report

revised to R5-187622

MCC TF160 R5-81

AI: 2.1

revised [WTS] [JSN]
R5-186716 MCC TF160 ToR 2019 ToR MCC TF160 R5-81

AI: 2.1

endorsed [WTS] [JSN]
R5-186717 eNB-IoT: Test Model updates CR MCC TF160 36.523-3 15.1.0 CR#4312 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.5

agreed [WTS] [JSN]
R5-186718 V2X: Test Model updates CR MCC TF160 36.523-3 15.1.0 CR#4313 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.5

agreed [WTS] [JSN]
R5-186719 Updates related to introduction of test frequencies CR MCC TF160, Ericsson 38.508-1 15.1.0 CR#268 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186720 New annex for NR test frequency calculations CR MCC TF160, Ericsson 38.508-1 15.1.0 CR#269 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

revised [WTS] [JSN]
R5-186721 Updates to E-UTRA RRC_CONNECTED generic procedure CR MCC TF160, Ericsson, Qualcomm 38.508-1 15.1.0 CR#270 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186722 Update SecurityAlgorithmConfig CR MCC TF160 38.508-1 15.1.0 CR#271 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186723 Updates to MeasResults CR MCC TF160 38.508-1 15.1.0 CR#272 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186724 EN-DC test model handling of different types of bearers CR MCC TF160 38.523-3 15.1.0 CR#10 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.6

revised [WTS] [JSN]
R5-186725 Correction to 5GS test case 7.1.2.2.5 CR MCC TF160, Mediatek Inc. 38.523-1 15.1.0 CR#167 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-186726 Updates to EN-DC TC 8.2.5.3.1 CR MCC TF160, Qualcomm 38.523-1 15.1.0 CR#168 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.5

revised [WTS] [JSN]
R5-186727 Default NR TBS Tables for SIG test cases CR MCC TF160, Motorola Mobility 38.523-3 15.1.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.6

agreed [WTS] [JSN]
R5-186728 SA Option2: Initial Test Model aspects CR MCC TF160 38.523-3 15.1.0 CR#12 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.6

revised [WTS] [JSN]
R5-186729 EN-DC: Misc. Test Model updates CR MCC TF160 38.523-3 15.1.0 CR#13 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.6

agreed [WTS] [JSN]
R5-186730 Alignments of UE Test Loop Mode H description CR MCC TF160 36.509 13.7.0 CR#198 catF TEI13_Test, NB_IOT-UEConTest Rel-13 R5-81

AI: 6.4.2

revised [WTS] [JSN]
R5-186731 Alignments of UE Test Loop Mode H description CR MCC TF160 36.509 14.5.0 CR#199 catA TEI13_Test, NB_IOT-UEConTest Rel-14 R5-81

AI: 6.4.2

revised [WTS] [JSN]
R5-186732 Alignments of UE Test Loop Mode H description CR MCC TF160 36.509 15.1.0 CR#200 catA TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 6.4.2

revised [WTS] [JSN]
R5-186733 Routine maintenance for TS 36.523-3 CR MCC TF160 36.523-3 15.1.0 CR#4314 catF TEI8_Test Rel-15 R5-81

AI: 6.4.5

agreed [WTS] [JSN]
R5-186734 Update RRCRelease CR Ericsson 38.508-1 15.1.0 CR#273 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186735 Update of FR1 6.2.2 MPR CR CAICT, Huawei, CMCC 38.521-1 15.0.0 CR#83 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-186736 Update of FR1 Transmit OFF power CR CAICT, Huawei 38.521-1 15.0.0 CR#84 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-186737 Test Point analysis for FR2 7.4 Maximum input level CR CAICT, Huawei 38.905 15.0.0 CR#25 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

revised [WTS] [JSN]
R5-186738 Update of FR2 6.3.2 Transmit OFF power CR CAICT, Huawei 38.521-2 15.0.0 CR#27 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

revised [WTS] [JSN]
R5-186739 Update of FR2 test case 7.4 CR CAICT, Anritsu, Huawei 38.521-2 15.0.0 CR#28 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.2

revised [WTS] [JSN]
R5-186740 General sections updated to 38.521-2 CR CAICT, Huawei 38.521-2 15.0.0 CR#29 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-186741 Addition of B72 for test cases with 5MHz channel bandwidth CR Airbus DS SLC 36.521-2 15.3.0 CR#790 catF LTE450_Europe_PPDR-UEConTest, TEI15_Test Rel-15 R5-81

AI: 5.4.1.3

revised [WTS] [JSN]
R5-186742 SR UE Conformance Test Aspects - ProSe Support for Band 72 in LTE WI status report Airbus DS SLC LTE450_B72_Europe_ProSe-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186743 SR UE Conformance Test Aspects - Addition of Power Class 1 UE to bands B31/B72 for LTE WI status report Airbus DS SLC LTE_PC1_B31_B72-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186744 Update RRCResume CR Ericsson 38.508-1 15.1.0 CR#274 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186745 Add RRCResumeComplete CR Ericsson 38.508-1 15.1.0 CR#275 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186746 Addition of new_TC_9_1_8_5 CR Starpoint, TDIA 38.523-1 15.1.0 CR#169 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186747 Addition of new 5GC TC 9.1.6.2.10 CR

revised to R5-188156

MediaTek Inc. 38.523-1 15.1.0 CR#170 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186748 Addition of new 5GC TC 9.1.6.2.5 CR MediaTek Inc. 38.523-1 15.1.0 CR#171 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186749 Test Point analysis for NR Narrow band in FR1 CR CAICT 38.905 15.0.0 CR#26 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

withdrawn [WTS] [JSN]
R5-186750 Test Point analysis for NR spurious response in FR1 CR CAICT 38.905 15.0.0 CR#27 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

withdrawn [WTS] [JSN]
R5-186751 Addition of new TC 9.1.8.7 CR Starpoint,TDIA,CATT 38.523-1 15.1.0 CR#172 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186752 WP - UE Conformance Test Aspects - Voice and Video Enhancement for LTE Work Plan CATT LTE_VoLTE_ViLTE_enh-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186753 SR - UE Conformance Test Aspects - Voice and Video Enhancement for LTE WI status report CATT LTE_VoLTE_ViLTE_enh-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186754 WP - UE Conformance Test Aspects - UL Data Compression in LTE Work Plan CATT LTE_UDC-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186755 Addition of new 5GS mobility management TC 9.1.7.1 CR

revised to R5-188157

Tejet,ZTE,SRTC 38.523-1 15.1.0 CR#173 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186756 SR - UE Conformance Test Aspects - UL Data Compression in LTE WI status report CATT LTE_UDC-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186757 Addition of new 5GS mobility management TC 9.1.7.2 CR

revised to R5-188158

Tejet,ZTE,SRTC 38.523-1 15.1.0 CR#174 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186758 Add applicability of new 5GS mobility management TC 9.1.7.1 and TC 9.1.7.2 CR Tejet, ZTE, SRTC 38.523-2 15.1.0 CR#20 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-186759 Correction on V2X testcase 24.3.1 CR CATT 36.523-1 15.3.0 CR#4652 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.3

withdrawn [WTS] [JSN]
R5-186760 Correction on V2X testcase 24.3.2 CR CATT, TF160 36.523-1 15.3.0 CR#4653 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.3

revised [WTS] [JSN]
R5-186761 Introduction of RRC TC QoE Measurement Collection in 8.3.5.1 CR Huawei, HiSilicon 36.523-1 15.3.0 CR#4654 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.2

revised [WTS] [JSN]
R5-186762 Introduction of RRC TC Qoemtsi Measurement Collection in 8.3.5.2 CR Huawei, HiSilicon 36.523-1 15.3.0 CR#4655 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.2

revised [WTS] [JSN]
R5-186763 Addition of SRB4 configuration to RRC connection CR Huawei, HiSilicon 36.508 15.3.0 CR#1210 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.1

revised [WTS] [JSN]
R5-186764 Addition of Condition QMC for LTE QMC test CR Huawei, HiSilicon 36.508 15.3.0 CR#1211 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.1

revised [WTS] [JSN]
R5-186765 Update of operating bands and channel arrangement to TS 38.521-1 CR China Unicom 38.521-1 15.0.0 CR#85 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

revised [WTS] [JSN]
R5-186766 Correction on V2X testcase 24.3.1 CR CATT, TF160 36.523-1 15.3.0 CR#4656 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.3

agreed [WTS] [JSN]
R5-186767 Modify the values of IEs in sps-AssistanceInformation-r14 CR CATT 36.523-1 15.3.0 CR#4657 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.1

withdrawn [WTS] [JSN]
R5-186768 Modify the values of IEs in sps-AssistanceInformation-r14 CR CATT 36.508 15.3.0 CR#1212 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.1

agreed [WTS] [JSN]
R5-186769 Addition of Time alignment error for UL-MIMO to TS38.521-1 CR China Unicom 38.521-1 15.0.0 CR#86 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-186770 Addition of new LTE_UDC-UEConTest test case 7.3.10.1 CR CATT 36.523-1 15.3.0 CR#4658 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.2

revised [WTS] [JSN]
R5-186771 Addition of new LTE_UDC-UEConTest test case 7.3.10.2 CR CATT 36.523-1 15.3.0 CR#4659 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.2

revised [WTS] [JSN]
R5-186772 Addition of new LTE_UDC-UEConTest test case 7.3.10.3 CR CATT 36.523-1 15.3.0 CR#4660 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.2

revised [WTS] [JSN]
R5-186773 Addition of 6.3D.1 Minimum output power for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#87 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

withdrawn [WTS] [JSN]
R5-186774 Addition of 6.3D.1 Minimum output power for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#88 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186775 Addition of new LTE_UDC-UEConTest test case 8.4.2.29 CR CATT 36.523-1 15.3.0 CR#4661 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.2

agreed [WTS] [JSN]
R5-186776 Addition of 6.3D.2 Transmit OFF power for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#89 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186777 Addition of new LTE_UDC-UEConTest test case 8.5.1.9 CR CATT 36.523-1 15.3.0 CR#4662 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.2

revised [WTS] [JSN]
R5-186778 Addition of new TC 9.1.8.8 CR Starpoint,TDIA,CATT 38.523-1 15.1.0 CR#175 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186779 Addition of the message content of PDCP-config for UDC CR CATT 36.523-1 15.3.0 CR#4663 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.1

withdrawn [WTS] [JSN]
R5-186780 Addition of applicability and tests conditions for UDC test cases CR CATT 36.523-2 15.3.0 CR#1229 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.3

agreed [WTS] [JSN]
R5-186781 Addition of 6.3D.3 Transmit ON/OFF time mask for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#90 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186782 Update RRCResumeRequest CR Ericsson 38.508-1 15.1.0 CR#276 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-186783 Addition of new TC 9.1.8.12 CR Starpoint,TDIA,CATT 38.523-1 15.1.0 CR#176 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186784 WP - LTE_QMC_Streaming-UEConTest for RAN5#81 Work Plan China Unicom LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186785 Add RRCSetup CR Ericsson 38.508-1 15.1.0 CR#277 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-186786 SR - LTE_QMC_Streaming-UEConTest for RAN5#81 WI status report China Unicom LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186787 Add UE capability data centric CR Ericsson 38.508-2 15.1.0 CR#6 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.2

withdrawn [WTS] [JSN]
R5-186788 Minor update OBW, SEM and ACLR inter-band FR1 test cases CR Keysight Technologies UK Ltd 38.521-3 15.0.0 CR#49 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186789 WP - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 Work Plan China Unicom LTE450_Reg3-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186790 SR - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 for RAN5#81 WI status report China Unicom LTE450_Reg3-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186791 TP analysis OBW intraband contiguous EN-DC CR Keysight Technologies UK Ltd 38.905 15.0.0 CR#28 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186792 TP analysis SEM intraband contiguous EN-DC CR Keysight Technologies UK Ltd 38.905 15.0.0 CR#29 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186793 New Work Item Proposal: UE Conformance Test Aspects – Enhanced LTE Support for Aerial Vehicles WID new

revised to R5-187628

NTT DOCOMO INC. Rel-15 R5-81

AI: 4.1

revised [WTS] [JSN]
R5-186794 Addition of new TC 9.1.8.16 CR Starpoint,TDIA,CATT 38.523-1 15.1.0 CR#177 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186795 Addition of applicability statements for LTE QMC test cases CR China Unicom 36.523-2 15.3.0 CR#1230 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.3

revised [WTS] [JSN]
R5-186796 Correction to NB-IoT test case 22.4.19a CR ROHDE & SCHWARZ 36.523-1 15.3.0 CR#4664 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

agreed [WTS] [JSN]
R5-186797 Adding test cases for new features in the latest IR.92 discussion NTT DOCOMO INC. R5-81

AI: 6.5.6.5

noted [WTS] [JSN]
R5-186798 Update specific messages to simplify TS 38.523-1 discussion NTT DOCOMO INC. R5-81

AI: 6.3.9.19

noted [WTS] [JSN]
R5-186799 Correction to NB-IoT test case 22.4.22 CR ROHDE & SCHWARZ 36.523-1 15.3.0 CR#4665 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 6.4.3.11

revised [WTS] [JSN]
R5-186800 Correction to NB-IoT test case 22.3.3.5 CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4666 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-186801 Update RRC TC 8.2.2.2.1 - Split SRB Establishment and Release / EN-DC CR Tech Mahindra Limited and Qualcomm 38.523-1 15.1.0 CR#178 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186802 Update RRC TC 8.2.2.7.1 - Bearer Modification / Handling for bearer type change without security key change / EN-DC CR Tech Mahindra Limited and Qualcomm 38.523-1 15.1.0 CR#179 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186803 Update RRC TC8.2.3.7.1 - Measurement configuration control and reporting / Event A4 (intra-frequency, inter-frequency and inter-band measurements) / Measurement of Neighbour NR cell / EN-DC CR Tech Mahindra Limited, Qualcomm 38.523-1 15.1.0 CR#180 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-186804 Update chapter 4.5.3 RRC_INACTIVE CR Ericsson 38.508-1 15.1.0 CR#278 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186805 TP analysis for time alignment error for MIMO FR1 CR China Unicom 38.905 15.0.0 CR#30 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

withdrawn [WTS] [JSN]
R5-186806 Alignment of 256QAM EVM Test Tolerance between LTE and NR CR Intel Deutschland GmbH 36.521-1 15.3.1 CR#4539 catF TEI14_Test Rel-15 R5-81

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-186807 GCF 3GPP TCL after GCF CAG#56 report Ericsson R5-81

AI: 2.2

noted [WTS] [JSN]
R5-186808 RAN5#81 summary of changes to RAN5 test cases with potential impact on GCF and PTCRB report Ericsson, Samsung R5-81

AI: 7.5

postponed [WTS] [JSN]
R5-186809 WP UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA Work Plan Ericsson LTE_UTRA_IncMon-UEConTest Rel-12 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186810 SR UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA WI status report Ericsson LTE_UTRA_IncMon-UEConTest Rel-12 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-186811 WP UE Conformance Test Aspects - Rel-13 LTE CA configurations Work Plan Ericsson LTE_CA_Rel13-UEConTest Rel-13 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186812 SR UE Conformance Test Aspects - Rel-13 LTE CA configurations WI status report Ericsson LTE_CA_Rel13-UEConTest Rel-13 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186813 WP UE Conformance Test Aspects - Rel-14 LTE CA configurations Work Plan Ericsson LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186814 SR UE Conformance Test Aspects - Rel-14 LTE CA configurations WI status report Ericsson LTE_CA_R14-UEConTest Rel-14 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186815 WP UE Conformance Test Aspects - Rel-15 LTE CA configurations Work Plan Ericsson LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186816 SR UE Conformance Test Aspects - Rel-15 LTE CA configurations WI status report Ericsson LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186817 WP UE Conformance Test Aspects - Rel-16 LTE CA configurations Work Plan Ericsson LTE_CA_R16-UEConTest Rel-16 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186818 SR UE Conformance Test Aspects - Rel-16 LTE CA configurations WI status report Ericsson LTE_CA_R16-UEConTest Rel-16 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186819 Revised WID on: UE Conformance Test Aspects - Rel-16 LTE CA configurations WID revised Ericsson LTE_CA_R16-UEConTest Rel-16 R5-81

AI: 7.4.2

endorsed [WTS] [JSN]
R5-186820 WP UE Conformance Test Aspects - 5G system with NR and LTE Work Plan Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186821 SR UE Conformance Test Aspects - 5G system with NR and LTE WI status report Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 7.4.2

available [WTS] [JSN]
R5-186822 Update of RAN5 5G NR phases and target update RAN5#81 discussion Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 7.5

postponed [WTS] [JSN]
R5-186823 3GPP RAN5 CA status list (pre-RAN5#81 meeting) other Ericsson R5-81

AI: 2.2

noted [WTS] [JSN]
R5-186824 3GPP RAN5 CA status list (post-RAN5#81 meeting) other Ericsson R5-81

AI: 7.5

postponed [WTS] [JSN]
R5-186825 Correction of test frequencies for NR band n1 CR Ericsson 38.508-1 15.1.0 CR#279 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186826 Correction of test frequencies for NR band n2 CR Ericsson 38.508-1 15.1.0 CR#280 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186827 Correction of test frequencies for NR band n3 CR Ericsson 38.508-1 15.1.0 CR#281 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186828 Correction of test frequencies for NR band n5 CR Ericsson 38.508-1 15.1.0 CR#282 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186829 Correction of test frequencies for NR band n7 CR Ericsson 38.508-1 15.1.0 CR#283 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186830 Correction of test frequencies for NR band n8 CR Ericsson 38.508-1 15.1.0 CR#284 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186831 Correction of test frequencies for NR band n12 CR Ericsson 38.508-1 15.1.0 CR#285 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186832 Correction of test frequencies for NR band n20 CR Ericsson 38.508-1 15.1.0 CR#286 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186833 Correction of test frequencies for NR band n25 CR Ericsson 38.508-1 15.1.0 CR#287 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186834 Correction of test frequencies for NR band n28 CR Ericsson 38.508-1 15.1.0 CR#288 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186835 Correction of test frequencies for NR band n34 CR Ericsson 38.508-1 15.1.0 CR#289 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186836 Correction of test frequencies for NR band n38 CR Ericsson 38.508-1 15.1.0 CR#290 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186837 Correction of test frequencies for NR band n39 CR Ericsson 38.508-1 15.1.0 CR#291 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186838 Correction of test frequencies for NR band n40 CR Ericsson 38.508-1 15.1.0 CR#292 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186839 Correction of test frequencies for NR band n41 CR Ericsson 38.508-1 15.1.0 CR#293 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186840 Correction of test frequencies for NR band n51 CR Ericsson 38.508-1 15.1.0 CR#294 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186841 Introduction of test frequencies for NR band n66 CR Ericsson 38.508-1 15.1.0 CR#295 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186842 Introduction of test frequencies for NR band n70 CR Ericsson 38.508-1 15.1.0 CR#296 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186843 Correction of test frequencies for NR band n71 CR Ericsson 38.508-1 15.1.0 CR#297 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

revised [WTS] [JSN]
R5-186844 Correction of test frequencies for NR band n75 CR Ericsson 38.508-1 15.1.0 CR#298 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186845 Correction of test frequencies for NR band n76 CR Ericsson 38.508-1 15.1.0 CR#299 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186846 Correction of test frequencies for NR band n77 CR Ericsson 38.508-1 15.1.0 CR#300 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186847 Correction of test frequencies for NR band n78 CR Ericsson 38.508-1 15.1.0 CR#301 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186848 Correction of test frequencies for NR band n79 CR Ericsson 38.508-1 15.1.0 CR#302 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186849 Correction of test frequencies for NR band n257 CR Ericsson 38.508-1 15.1.0 CR#303 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

revised [WTS] [JSN]
R5-186850 Correction of test frequencies for NR band n258 CR Ericsson 38.508-1 15.1.0 CR#304 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186851 Correction of test frequencies for NR band n260 CR Ericsson 38.508-1 15.1.0 CR#305 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186852 Correction of test frequencies for NR band n261 CR Ericsson 38.508-1 15.1.0 CR#306 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-186853 Correction of test frequencies for signalling testing in clause 6 CR Ericsson 38.508-1 15.1.0 CR#307 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

revised [WTS] [JSN]
R5-186854 Correction to DCI formats 0_0 and 0_1 CR Ericsson, MCC TF160, Huawei, HiSilicon, Keysight Technologies 38.508-1 15.1.0 CR#308 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

revised [WTS] [JSN]
R5-186855 Introduction of preamble test states CR Ericsson 38.508-1 15.1.0 CR#309 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-186856 Introduction of SDL and SUL cells in simulated cells in clause 4.4.2 CR Ericsson 38.508-1 15.1.0 CR#310 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186857 Introduction DCI format 1_0 for paging, SI and random access CR Ericsson, MCC TF160 38.508-1 15.1.0 CR#311 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186858 Correction to DCI format 1_1 CR Ericsson, MCC TF160 38.508-1 15.1.0 CR#312 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186859 Update IE RateMatchPattern CR Ericsson 38.508-1 15.1.0 CR#313 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186860 Correction to RRC_IDLE procedure CR Ericsson 38.508-1 15.1.0 CR#314 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186861 Correction of generic procedure parameter naming for test loop function CR Ericsson 38.508-1 15.1.0 CR#315 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186862 Correction of test procedures to activate and deactivate UE Beamlock Function CR Ericsson 38.508-1 15.1.0 CR#316 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186863 Update of Test Control UE Beamlock Function messages CR Ericsson 38.509 15.1.0 CR#7 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186864 New test case for UL-SCH transport block size selection for DCI format 0 and 256QAM UL CR Ericsson 36.523-1 15.3.0 CR#4667 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 6.3.14.2

withdrawn [WTS] [JSN]
R5-186865 New test case for PUSCH transmission in UpPTS in frame structure 2 CR Ericsson 36.523-1 15.3.0 CR#4668 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 6.3.14.2

withdrawn [WTS] [JSN]
R5-186866 Applicability of new uplink capacity enhancement test cases for LTE CR Ericsson 36.523-2 15.3.0 CR#1231 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 6.3.14.3

withdrawn [WTS] [JSN]
R5-186867 Applicability and ICS for CA RF and RRM test cases CR Ericsson, Rohde & Schwarz, Huawei, HiSilicon, KTL, SGS Wireless 36.521-2 15.3.0 CR#791 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.3

revised [WTS] [JSN]
R5-186868 LS on NR Test Methods applicability for different UE power classes LS in

source LS: R4-1814312

TSG RAN4 FS_NR_test_methods Rel-16 R5-81

AI: 5.2

noted [WTS] [JSN]
R5-186869 LS on Vehicle mounted UE antenna performance LS in

source LS: R4-1814315

TSG RAN4 FS_NR_2RX_vehUE Rel-15 R5-81

AI: 5.2

noted [WTS] [JSN]
R5-186870 LS to RAN5 and GCF on method to distinguish vehicle UE from handheld UE LS in

source LS: R4-1814321

TSG WG RAN4 FS_NR_2RX_vehUE Rel-15 R5-81

AI: 5.2

noted [WTS] [JSN]
R5-186871 Specifying Test procedure to check that UE is in RRC_IDLE state on a certain NR cell CR Samsung 38.508-1 15.1.0 CR#317 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186872 Removal of RRC SCG failure TC 8.2.5.5.1 CR Samsung 38.523-1 15.1.0 CR#181 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186873 Removal of RRC SCG failure TC 8.2.5.6.1 CR Samsung 38.523-1 15.1.0 CR#182 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186874 Update to 5G TC TA registration update CR

revised to R5-187796

Samsung 38.523-1 15.1.0 CR#183 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186875 Removal of applicability for RRC SCG failure tests CR Samsung 38.523-2 15.1.0 CR#21 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186876 Adding applicability for 5G TC TA registration update CR Samsung 38.523-2 15.1.0 CR#22 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

revised [WTS] [JSN]
R5-186877 Adding applicability for new 38.521-1 CA TCs CR Samsung 38.522 15.0.0 CR#14 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.8

revised [WTS] [JSN]
R5-186878 Correction to Generic Test Procedure for MCPTT pre-established session establishment CO CR Samsung 36.579-1 14.0.0 CR#10 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-186879 Editorial update of the default SDP and Resource-list Messages CR Samsung 36.579-1 14.0.0 CR#11 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-186880 Update of default MCPTT media plane control messages and other information elements to reflect latest Rel-13 core specs CR Samsung 36.579-1 14.0.0 CR#12 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-186881 Update of XML schema for MCPTT location information to reflect latest Rel-13 core specs CR Samsung 36.579-1 14.0.0 CR#13 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-186882 Update of MCPTT Client off-network operation TCs Core requirements to reflect latest Rel-13 core specs CR Samsung 36.579-2 14.0.0 CR#17 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.2

agreed [WTS] [JSN]
R5-186883 Update of MCPTT Private Calls with Floor Control TCs Core requirements to reflect latest Rel-13 core specs CR Samsung 36.579-2 14.0.0 CR#18 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.2

agreed [WTS] [JSN]
R5-186884 Update of MCPTT Private Calls without Floor Control TCs Core requirements to reflect latest Rel-13 core specs CR Samsung 36.579-2 14.0.0 CR#19 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.2

agreed [WTS] [JSN]
R5-186885 Update of MCPTT Private Calls within a pre-established session TCs Core requirements to reflect latest Rel-13 core specs CR Samsung 36.579-2 14.0.0 CR#20 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.2

agreed [WTS] [JSN]
R5-186886 Update of PRD13 other Samsung R5-81

AI: 7.3

approved [WTS] [JSN]
R5-186887 NR FR1 TT Way Forward update discussion

revised to R5-187813

Telecom Italia, Orange, AT&T, CMCC 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-186888 NR FR2 TT Proposal discussion

revised to R5-188056

Telecom Italia, AT&T, China Mobile, China Telecom, China Unicom, DISH Network, Orange, Sprint, Vodafone 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-186889 Correction to the default Pre-Test Conditions for AM and UM RLC test cases CR Keysight Technologies UK Ltd 38.523-1 15.1.0 CR#184 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.3

revised [WTS] [JSN]
R5-186890 Correction to NR RRC test case 8.2.3.14.1 CR Keysight Technologies UK Ltd 38.523-1 15.1.0 CR#185 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186891 Correction to NR RRC test case 8.2.3.13.1 CR Keysight Technologies UK Ltd 38.523-1 15.1.0 CR#186 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186892 Correction to NR PDCP test case 7.1.3.4.2 CR Keysight Technologies UK Ltd 38.523-1 15.1.0 CR#187 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186893 Corrections to the notes in the OTA signal level tables CR Keysight Technologies UK Ltd 38.508-1 15.1.0 CR#318 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186894 Update on RTS Linearization CR Keysight Technologies UK Ltd 37.544 14.6.0 CR#29 catF TEI14_Test, LTE_MIMO_OTA-UEConTest Rel-14 R5-81

AI: 5.5.15

agreed [WTS] [JSN]
R5-186895 Correction to eMDT2 test case 8.6.1.3 CR Intel Corporation (UK) Ltd 36.523-1 13.5.0 CR#4669 catF TEI13_Test Rel-13 R5-81

AI: 6.4.3.3.5

withdrawn [WTS] [JSN]
R5-186896 5GS inactive state discussion Ericsson R5-81

AI: 6.3.9.19

noted [WTS] [JSN]
R5-186897 Correction to eMDT2 test case 8.6.1.3 CR

revised to R5-188121

Intel Corporation (UK) Ltd, Keysight Technologies UK Ltd., Keysight 36.523-1 15.3.0 CR#4670 catF TEI13_Test Rel-15 R5-81

AI: 6.4.3.3.5

revised [WTS] [JSN]
R5-186898 5GS AKA/EAP default discussion Ericsson R5-81

AI: 6.3.9.19

noted [WTS] [JSN]
R5-186899 Addition OBW intra-band contiguous EN-DC CR Keysight Technologies UK Ltd 38.521-3 15.0.0 CR#50 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-186900 Addition SEM intra-band contiguous EN-DC CR Keysight Technologies UK Ltd 38.521-3 15.0.0 CR#51 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-186901 Update SEM requirements to TS 38.101-1 v15.3.0 CR Keysight Technologies UK Ltd 38.521-1 15.0.0 CR#91 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186902 Update ACS and inband blocking test cases in TS 38.521-1 CR Keysight Technologies UK Ltd 38.521-1 15.0.0 CR#92 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-186903 Update MU budget in TR 38.903 CR Keysight Technologies UK Ltd 38.903 15.0.0 CR#9 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

revised [WTS] [JSN]
R5-186904 5GS S-NSSAI discussion Ericsson R5-81

AI: 6.3.9.19

withdrawn [WTS] [JSN]
R5-186905 Uplink PTRS disable for RF testing CR

revised to R5-187801

Keysight Technologies UK Ltd 38.508-1 15.1.0 CR#319 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

revised [WTS] [JSN]
R5-186906 Addition OBW intraband non contiguous EN-DC CR Keysight Technologies UK Ltd 38.521-3 15.0.0 CR#52 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-186907 Update general parameter Connection without release in initial conditions in TS 38.521-3 CR Keysight Technologies UK Ltd 38.521-3 15.0.0 CR#53 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-186908 Correction to LTE<>GERAN idle mode test case 6.2.3.30 CR Keysight Technologies UK Ltd 36.523-1 15.3.0 CR#4671 catF TEI8_Test Rel-15 R5-81

AI: 6.4.3.1

agreed [WTS] [JSN]
R5-186909 5GS follow-on discussion Ericsson R5-81

AI: 6.3.9.19

noted [WTS] [JSN]
R5-186910 5GS IMS discussion Ericsson R5-81

AI: 6.3.9.19

noted [WTS] [JSN]
R5-186911 Add RRCSetupComplete CR Ericsson 38.508-1 15.1.0 CR#320 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186912 Add RRCSetupRequest CR Ericsson 38.508-1 15.1.0 CR#321 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186913 Add RRCSystemInfoRequest CR Ericsson 38.508-1 15.1.0 CR#322 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186914 Update of Test case 8.5.4.1 with UE DL and UL Cat 22,23,24,25,26 capability check CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#4672 catF TEI15_Test Rel-15 R5-81

AI: 6.4.3.3.1

revised [WTS] [JSN]
R5-186915 Correction to SRVCC test cases for IMS Reregistration over UTRAN CR Keysight Technologies UK Ltd 36.523-2 15.3.0 CR#1232 catF TEI8_Test Rel-15 R5-81

AI: 6.4.3.8

withdrawn [WTS] [JSN]
R5-186916 Add SecurityModeCommand CR Ericsson 38.508-1 15.1.0 CR#323 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186917 Addition of DL and UL Category 22,23,24,25,26 to Table A.4.3.2-2 and A.4.3.2-3 CR Intel Corporation (UK) Ltd 36.523-2 15.3.0 CR#1233 catF TEI15_Test Rel-15 R5-81

AI: 6.4.4

revised [WTS] [JSN]
R5-186918 Update SystemInformation CR Ericsson 38.508-1 15.1.0 CR#324 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186919 Correction to SRVCC test cases for IMS Reregistration over UTRAN CR Keysight Technologies UK Ltd 36.523-1 15.3.0 CR#4673 catF TEI8_Test Rel-15 R5-81

AI: 6.4.3.8

revised [WTS] [JSN]
R5-186920 Add UEAssistanceInformation CR Ericsson 38.508-1 15.1.0 CR#325 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186921 Update UECapabilityEnquiry CR Ericsson 38.508-1 15.1.0 CR#326 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186922 Update ULInformationTransfer CR Ericsson 38.508-1 15.1.0 CR#327 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186923 Update IE PTRS-UplinkConfig CR Ericsson 38.508-1 15.1.0 CR#328 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186924 Update IE RLF-TimersAndConstants CR Ericsson 38.508-1 15.1.0 CR#329 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186925 Update RRCResumeRequest CR Ericsson 38.508-1 15.1.0 CR#330 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186926 Add UE implementation capabilities CR Ericsson 38.508-2 15.1.0 CR#7 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

withdrawn [WTS] [JSN]
R5-186927 Introduction of FR1 TC 7.6D.2 Inband blocking for UL MIMO CR CAICT 38.521-1 15.0.0 CR#93 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

withdrawn [WTS] [JSN]
R5-186928 Introduction of FR1 TC 7.6D.3 Out-of-band blocking for UL MIMO CR CAICT 38.521-1 15.0.0 CR#94 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

withdrawn [WTS] [JSN]
R5-186929 Update PTRS-DownlinkConfig CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#331 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186930 Introduction of FR1 TC 7.6D.4 Narrow-band blocking for UL MIMO CR CAICT 38.521-1 15.0.0 CR#95 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

withdrawn [WTS] [JSN]
R5-186931 Update CSI related information elements CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#332 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186932 Introduction of FR1 TC 7.8D Intermodulation characteristics for UL-MIMO CR CAICT 38.521-1 15.0.0 CR#96 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

withdrawn [WTS] [JSN]
R5-186933 Introduction of FR2 TC 6.2.2 UE maximum output power reduction CR CAICT 38.521-2 15.0.0 CR#30 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

withdrawn [WTS] [JSN]
R5-186934 Update ServingCellConfigCommon and TDD-UL-DL-Config CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#333 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186935 Update SRS-Config CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#334 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186936 Update PUCCH-SpatialRelationInfo CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#335 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186937 Update some information elements for measurements CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#336 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186938 Update CellGroupConfig and related information elements CR NTT DOCOMO INC., Huawei, Anritsu Ltd. 38.508-1 15.1.0 CR#337 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186939 Add PICS for 5GMM implementation cabilities CR

revised to R5-188125

MediaTek Inc. 38.508-2 15.1.0 CR#8 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.2

revised [WTS] [JSN]
R5-186940 Addition of specific RDS message contents for NB-IoT test case 22.5.19 CR TDIA, CATT 36.523-1 15.3.0 CR#4674 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

revised [WTS] [JSN]
R5-186941 CR of NR 508-1 clause 4.6.2_SIB2, SIB4 CR Huawei, Hisilicon, Ericssion, TF160 38.508-1 15.1.0 CR#338 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186942 CR of NR 508-1 Table 4.4.2-2_Default NR Cells parameters CR Huawei, Hisilicon, Ericsson, TF160 38.508-1 15.1.0 CR#339 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186943 CR of NR 508-1 Table 4.6.3-107_ReportConfigNR CR Huawei, Hisilicon 38.508-1 15.1.0 CR#340 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

withdrawn [WTS] [JSN]
R5-186944 Addition of NR test case 6.1.1.2_PLMN selection of Other PLMN CR

revised to R5-188126

Huawei, Hisilicon 38.523-1 15.1.0 CR#188 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186945 Addition of NR test case 6.1.1.3_Cell reselection of ePLMN CR

revised to R5-188127

Huawei, Hisilicon 38.523-1 15.1.0 CR#189 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186946 Addition of NR test case 6.1.1.4_PLMN selection in shared network environment CR

revised to R5-188128

Huawei, Hisilicon 38.523-1 15.1.0 CR#190 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186947 Addition of NR test case 6.1.1.5_PLMN selection CR

revised to R5-188129

Huawei, Hisilicon 38.523-1 15.1.0 CR#191 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186948 Addition of NR test case 6.1.2.1_Cell selection_Qrxlevmin CR

revised to R5-188130

Huawei, Hisilicon 38.523-1 15.1.0 CR#192 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186949 Addition of NR test case 6.1.2.2_Cell selection_Qqualmin CR

revised to R5-188131

Huawei, Hisilicon 38.523-1 15.1.0 CR#193 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186950 Addition of NR test case 6.1.2.3_Cell selection_Serving cell bar CR

revised to R5-188132

Huawei, Hisilicon 38.523-1 15.1.0 CR#194 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186951 Addition of NR test case 6.1.2.4_Cell selection_Serving cell Squal below Zero CR

revised to R5-188133

Huawei, Hisilicon 38.523-1 15.1.0 CR#195 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186952 Addition of NR test case 6.1.2.5_Cell Reselection CR

revised to R5-188134

Huawei, Hisilicon 38.523-1 15.1.0 CR#196 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186953 Addition of NR test case 6.1.2.6_Cell Reselection for interband operation CR

revised to R5-188135

Huawei, Hisilicon 38.523-1 15.1.0 CR#197 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186954 Addition of NR test case 6.1.2.9_Cell Reselection using Qhyst, Qoffset and Treselection CR

revised to R5-188136

Huawei, Hisilicon 38.523-1 15.1.0 CR#198 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186955 Addition of NR test case 6.1.2.20_Inter-frequency cell reselection according to priority CR

revised to R5-188137

Huawei, Hisilicon 38.523-1 15.1.0 CR#199 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186956 Addition of NR test case 6.1.2.21_Cell reselection,SIntra SearchQ and SnonIntraSeqrchQ CR

revised to R5-188138

Huawei, Hisilicon 38.523-1 15.1.0 CR#200 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186957 Addition of NR test case 6.1.2.22_Inter-frequency cell reselection with parameters ThreshX, HighQ, ThreshX, LowQ and ThreshServing, LowQ CR

revised to R5-188139

Huawei, Hisilicon 38.523-1 15.1.0 CR#201 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-186958 Addition of NR test case 7.1.1.1.3_SI Request CR Huawei, Hisilicon 38.523-1 15.1.0 CR#202 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186959 Addition of NR test case 7.1.1.1.6_Random access CR Huawei, Hisilicon 38.523-1 15.1.0 CR#203 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186960 Addition of NR test case 7.1.1.2.3_CCCH HARQ CR Huawei, Hisilicon 38.523-1 15.1.0 CR#204 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186961 Addition of NR test case 7.1.1.2.4_BCCH HARQ CR

revised to R5-188140

Huawei, Hisilicon 38.523-1 15.1.0 CR#205 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186962 CR of NR test case 7.1.1.1.4_Beam Failure CR

revised to R5-188141

Huawei, Hisilicon 38.523-1 15.1.0 CR#206 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186963 CR of NR test case 7.1.1.1.5_SUL CR Huawei, Hisilicon 38.523-1 15.1.0 CR#207 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-186964 CR of NR test case 7.1.1.3.7_Power Headroom Reporting CR

revised to R5-188142

Huawei, Hisilicon 38.523-1 15.1.0 CR#208 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186965 CR of NR test case 7.1.1.5.4_DRX CR

revised to R5-188143

Huawei, Hisilicon 38.523-1 15.1.0 CR#209 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186966 CR of NR test case 7.1.1.6.1_Correct handling of DL assignmentSemi persistent CR

revised to R5-188144

Huawei, Hisilicon 38.523-1 15.1.0 CR#210 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186967 CR of NR test case 7.1.1.6.2_configured grant Type 1 CR

revised to R5-188145

Huawei, Hisilicon 38.523-1 15.1.0 CR#211 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186968 CR of NR test case 7.1.1.6.3_configured grant Type 2 CR

revised to R5-188146

Huawei, Hisilicon 38.523-1 15.1.0 CR#212 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186969 CR of NR test case 7.1.2.3.9_RLC Reassembling CR Huawei, Hisilicon 38.523-1 15.1.0 CR#213 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.3

revised [WTS] [JSN]
R5-186970 Addition of NR test case 8.1.1.1.2_Paging CR

revised to R5-188147

Huawei, Hisilicon 38.523-1 15.1.0 CR#214 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-186971 Addition of NR test case 8.1.1.2.1_RRC connection establishment CR

revised to R5-188148

Huawei, Hisilicon 38.523-1 15.1.0 CR#215 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-186972 Addition of NR test case 8.1.1.2.3_T300 expiry CR Huawei, Hisilicon 38.523-1 15.1.0 CR#216 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-186973 Addition of NR test case 8.1.1.3.1_Redirection to NR CR

revised to R5-187788

Huawei, Hisilicon 38.523-1 15.1.0 CR#217 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-186974 Addition of NR test case 8.1.3.1.1_Event A1 CR

revised to R5-188149

Huawei, Hisilicon 38.523-1 15.1.0 CR#218 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-186975 Addition of NR test case 8.1.3.1.2_ Measurement Event A2 CR Huawei, Hisilicon 38.523-1 15.1.0 CR#219 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

withdrawn [WTS] [JSN]
R5-186976 Addition of NR test case 8.1.3.1.12.1_Measurement Event A6 CR Huawei, Hisilicon 38.523-1 15.1.0 CR#220 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

withdrawn [WTS] [JSN]
R5-186977 Addition of NR test case 8.1.5.3.1_PWS notification CR Huawei, Hisilicon 38.523-1 15.1.0 CR#221 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-186978 Addition of NR test case 9.1.5.1.1_Registration Request CR

revised to R5-187744

Huawei, Hisilicon, Caict, CATT, Samsung, TF160, R&S, Motorola, Ericsson, Qualcomm 38.523-1 15.1.0 CR#222 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-186979 Addition of NR test case 9.1.6.1.2_T3521 timeout CR Huawei, Hisilicon 38.523-1 15.1.0 CR#223 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-186980 CR of 5G_NR_Applicability CR

revised to R5-188179

Huawei, Hisilicon 38.523-2 15.1.0 CR#23 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

revised [WTS] [JSN]
R5-186981 CR of 5G_NR_NAS_Applicability CR

revised to R5-188101

Huawei, Hisilicon 38.523-2 15.1.0 CR#24 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

revised [WTS] [JSN]
R5-186982 Update RLC-Config CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#341 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-186983 CR of 5G_NR_Capabilities CR Huawei, Hisilicon 38.508-2 15.1.0 CR#9 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.2

withdrawn [WTS] [JSN]
R5-186984 CR of applicability for NR test case 7.1.1.1.5_SUL CR Huawei, Hisilicon 38.523-2 15.1.0 CR#25 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-186985 Correction to SSAC connected mode test case 13.5.2a CR Keysight Technologies UK Ltd, Qualcomm Incorporated 36.523-1 15.3.0 CR#4675 catF TEI12_Test Rel-15 R5-81

AI: 6.4.3.8

agreed [WTS] [JSN]
R5-186986 Correction to NB-IoT test case 22.3.1.8 and 22.4.24 CR TDIA, CATT 36.523-1 15.3.0 CR#4676 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

agreed [WTS] [JSN]
R5-186987 Addition of SIB3 message_Resubmission of 185792 CR Huawei, Hisilicon 38.508-1 15.1.0 CR#342 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186988 Addition of SIB5 message_Resubmission of 186054 CR Huawei, Hisilicon 38.508-1 15.1.0 CR#343 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186989 Addition of SIB6 - SIB8 message_Resubmission of 186055 CR Huawei, Hisilicon 38.508-1 15.1.0 CR#344 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186990 Addition of SIB9 message_Resubmission of 186056 CR Huawei, Hisilicon 38.508-1 15.1.0 CR#345 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186991 Addition of NR test case 8.2.3.11.1_gapFR1_Resubmission of 186152 CR Huawei, Hisilicon 38.523-1 15.1.0 CR#224 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-186992 Addition of NR test case 8.2.3.11.2_gapFR2 CR

revised to R5-187793

Huawei, Hisilicon 38.523-1 15.1.0 CR#225 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-186993 Addition of NR test case 7.1.1.1.4_Beam Failure_Resubmission of 186078 CR Huawei, Hisilicon 38.523-1 15.1.0 CR#226 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-186994 Addition of NR test case 7.1.1.1.5 SUL CR Huawei, Hisilicon 38.523-1 15.1.0 CR#227 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

revised [WTS] [JSN]
R5-186995 CR of test case 8.2.4.2_NR CA release_Resubmission of 186101 CR Huawei, Hisilicon 38.523-1 15.1.0 CR#228 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-186996 Correction to NB-IoT Test case 22.3.1.9 CR TDIA, MCC TF160, CATT 36.523-1 15.3.0 CR#4677 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

revised [WTS] [JSN]
R5-186997 New WID proposal: UE Conformance Test Aspects – Enhancing LTE CA Utilization WID new

revised to R5-187629

Nokia, Nokia Shanghai Bell Rel-15 R5-81

AI: 4.1

revised [WTS] [JSN]
R5-186998 Correction to NB-IoT test case 22.3.2.6 CR TDIA, CATT 36.523-1 15.3.0 CR#4678 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

revised [WTS] [JSN]
R5-186999 Correction to applicability for NB-IoT testcase 22.3.2.7 CR TDIA, MCC TF160, CATT 36.523-2 15.3.0 CR#1234 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.4

agreed [WTS] [JSN]
R5-187000 Correction to NB-IoT Test case 22.4.25 CR TDIA, CATT 36.523-1 15.3.0 CR#4679 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

agreed [WTS] [JSN]
R5-187001 Update NB-IoT Rel-14 DCI format N0/N1 with HARQ process number CR TDIA, MCC TF160, CATT 36.508 15.3.0 CR#1213 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.1

revised [WTS] [JSN]
R5-187002 Correction to Table 8.1.6.1-15a SCPTMConfiguration-NB CR TDIA, CATT 36.508 15.3.0 CR#1214 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.1

agreed [WTS] [JSN]
R5-187003 Update NB-IOT Random Access test cases 6.2.16, 6.2.17 and 6.2.18 CR Huawei, HiSilicon 36.521-3 15.3.0 CR#2321 catF TEI13_Test Rel-15 R5-81

AI: 5.4.1.4

revised [WTS] [JSN]
R5-187004 Update 6.2.4G.1 the V2V AMPR test case to remove brackets and add Power Class 2 CR Huawei, HiSilicon 36.521-1 15.3.1 CR#4540 catF TEI14_Test, LTE_SL_V2V-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187005 Adding connection diagram for eNB-IoT RRM test case 6.2.18 CR Huawei, HiSilicon, CMCC 36.508 15.3.0 CR#1215 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.1

agreed [WTS] [JSN]
R5-187006 Add RRCSetup CR Ericsson 38.508-1 15.1.0 CR#346 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187007 TDD configuration for UE Tx test in FR1 CR Ericsson 38.521-1 15.0.0 CR#97 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

revised [WTS] [JSN]
R5-187008 Introduction of Annex on Characteristics of the Interfering Signal CR Samsung,CMCC 38.521-1 15.0.0 CR#98 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

withdrawn [WTS] [JSN]
R5-187009 Introduction of test case for Frequency error for CA CR Samsung,CMCC 38.521-1 15.0.0 CR#99 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187010 Introduction of test cases for Transmit modulation quality for CA CR Samsung,CMCC 38.521-1 15.0.0 CR#100 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187011 Introduction of test case for Spectrum emission mask for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#101 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187012 Introduction of test case for NR ACLR for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#102 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187013 Introduction of test case for UTRA ACLR for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#103 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187014 Introduction of test case for General spurious emissions for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#104 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187015 Introduction of test case for Spurious emission for UE co-existence for CA CR Samsung,CMCC 38.521-1 15.0.0 CR#105 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187016 Introduction of test case for Transmit intermodulation for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#106 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187017 Discussion on test configuration for some inter-band UL CA test cases discussion Samsung 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

approved [WTS] [JSN]
R5-187018 Calculation and specification of default values for SIB1 IE offsetToPointA discussion Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.3

noted [WTS] [JSN]
R5-187019 TDD configuration for UE Tx test in FR2 CR Ericsson 38.521-2 15.0.0 CR#31 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187020 Clarification of test channel BW and SCS selection discussion

revised to R5-187910

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187021 Update RRCReconfiguration CR Ericsson 38.508-1 15.1.0 CR#347 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187022 Necessity for functional testing in RAN5 discussion

revised to R5-188030

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187023 Editorial update of Annex B CR Huawei, HiSilicon 38.903 15.0.0 CR#10 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187024 Addition of MU contribution for demodulation test cases CR Huawei, HiSilicon 38.903 15.0.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187025 Addition of MU contribution for RRM test cases CR Huawei, HiSilicon 38.903 15.0.0 CR#12 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187026 Addition of P-Max in Test environment for RF test CR Huawei, HiSilicon 38.508-1 15.1.0 CR#348 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187027 Addition of Combinations of system information blocks in 4.4.3.1.2 CR Huawei, HiSilicon 38.508-1 15.1.0 CR#349 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187028 Addition of test frequencies for SUL band n80 CR Huawei, HiSilicon 38.508-1 15.1.0 CR#350 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187029 Addition of test frequencies for SUL band n81 CR Huawei, HiSilicon 38.508-1 15.1.0 CR#351 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-187030 Addition of test frequencies for SUL band n82 CR Huawei, HiSilicon 38.508-1 15.1.0 CR#352 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187031 Addition of test frequencies for SUL band n83 CR Huawei, HiSilicon 38.508-1 15.1.0 CR#353 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187032 Addition of test frequencies for SUL band n84 CR Huawei, HiSilicon 38.508-1 15.1.0 CR#354 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187033 Addition of test frequencies for SUL band n86 CR Huawei, HiSilicon 38.508-1 15.1.0 CR#355 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187034 Adding edge allcation into common uplink configuration in 6.1 CR Huawei, HiSilicon,CAICT 38.521-1 15.0.0 CR#107 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187035 Update test points analysis for multiple FR1 test cases CR Huawei, HiSilicon, Keysight, CAICT 38.905 15.0.0 CR#31 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187036 Removing the Editor's notes of SA messages and procedures for all FR1 test cases CR Huawei, HiSilicon 38.521-1 15.0.0 CR#108 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187037 Removing the Editor's notes of SA messages and procedures for all FR2 test cases CR Huawei, HiSilicon 38.521-2 15.0.0 CR#32 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

revised [WTS] [JSN]
R5-187038 Update test points for multiple FR1 test cases CR Huawei, HiSilicon, Keysight, CAICT 38.521-1 15.0.0 CR#109 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187039 Update MU and TT in Annex F of 38.521-2 CR Huawei, HiSilicon 38.521-2 15.0.0 CR#33 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

withdrawn [WTS] [JSN]
R5-187040 Addition of new band into RF baseline implementation capabilities CR NTT DOCOMO, INC. 38.508-2 15.1.0 CR#10 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.2

agreed [WTS] [JSN]
R5-187041 LTE TDD configuration for UE Tx test in EN-DC CR Ericsson 38.521-3 15.0.0 CR#54 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

revised [WTS] [JSN]
R5-187042 Update IE RadioBearerConfig CR Ericsson 38.508-1 15.1.0 CR#356 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187043 Editorial correction to LAA Event Trigger Reporting Test 8.26.7 CR Anritsu 36.521-3 15.3.0 CR#2322 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187044 Editorial correction to the E-UTRA operating band group for Cat-M1 Clause 9 Tests CR Anritsu 36.521-3 15.3.0 CR#2323 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187045 Editorial correction to 9.1.10.1 CR Anritsu 36.521-3 15.3.0 CR#2324 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187046 Correction to Cat-M1 intra-frequency event triggered reporting tests CR Anritsu 36.521-3 15.3.0 CR#2325 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187047 Changing the cell configuration mapping tables to cater for generic duplex mode tests CR Anritsu 36.521-3 15.3.0 CR#2326 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

withdrawn [WTS] [JSN]
R5-187048 Correction to 3DL CA clause 8 generic duplex mode tests CR Anritsu 36.521-3 15.3.0 CR#2327 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-187049 Editorial correction to 4CA and 5CA ACS test cases CR Anritsu 36.521-1 15.3.1 CR#4541 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-187050 Editorial correction to 5DL CA blocking tests CR Anritsu 36.521-1 15.3.1 CR#4542 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-187051 Correction to the test configuration table of 7.3A.6 CR Anritsu 36.521-1 15.3.1 CR#4543 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.2

revised [WTS] [JSN]
R5-187052 Correction to frequency of CA_4A-7A for MSD with inter-band 2UL CR

revised to R5-187919

Anritsu 36.521-1 15.3.1 CR#4544 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.2

revised [WTS] [JSN]
R5-187053 Core alignment of Delta RIB table CR Anritsu 36.521-1 15.3.1 CR#4545 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.2

withdrawn [WTS] [JSN]
R5-187054 Editorial correction to 6.6.3.1A.2 Transmitter Spurious emissions for CA CR Anritsu 36.521-1 15.3.1 CR#4546 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187055 Editorial correction to 6.5.1A.2 Frequency error for CA CR Anritsu, Dekra 36.521-1 15.3.1 CR#4547 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-187056 Correction to 6.2.5A.3 Configured UE transmitted Output Power for CA CR Anritsu 36.521-1 15.3.1 CR#4548 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187057 Core alignment of Delta TIB table CR Anritsu 36.521-1 15.3.1 CR#4549 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.2

withdrawn [WTS] [JSN]
R5-187058 Addition of test frequency for CA_48C and CA_48A-48A CR Anritsu 36.508 15.3.0 CR#1216 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.1

agreed [WTS] [JSN]
R5-187059 Addition of test frequency for CA_40A-40A and CA_40A-40C CR Anritsu 36.508 15.3.0 CR#1217 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.1

agreed [WTS] [JSN]
R5-187060 Correction to 4x4 CA demodulation tests CR Anritsu 36.521-1 15.3.1 CR#4550 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-81

AI: 5.3.7.2

agreed [WTS] [JSN]
R5-187061 Correction to 6.1.9 FDD Intra-frequency RRC Re-establishment for Cat-M1 UE in CEModeA CR Anritsu 36.521-3 15.3.0 CR#2328 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187062 Correction to Minimum Test time for 8.12.1.1.2 Demodulation of NPDSCH CR Anritsu 36.521-1 15.3.1 CR#4551 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-187063 Correction to 8.26.7 FS3 Intra-frequency event triggered reporting CR Anritsu 36.521-3 15.3.0 CR#2329 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-81

AI: 5.4.1.4

revised [WTS] [JSN]
R5-187064 Editorial correction to FR3 RRM clause 8 Tests CR Anritsu 36.521-3 15.3.0 CR#2330 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-81

AI: 5.4.1.4

withdrawn [WTS] [JSN]
R5-187065 Removal of TC 7.3F.2 Reference sensitivity level with repetition for Category NB1 CR Anritsu 36.521-1 15.3.1 CR#4552 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-187066 Correction to LAA CQI tests CR Anritsu 36.521-1 15.3.1 CR#4553 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-81

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-187067 Correction to FS3 CSI-RSRP accuracy tests CR Anritsu 36.521-3 15.3.0 CR#2331 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187068 Correction to 6.6.3.3A.2 Additional spurious emissions for CA CR Anritsu 36.521-1 15.3.1 CR#4554 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187069 Correction to 6.2.4A.2 Additional Maximum Power Reduction (A-MPR) for CA CR Anritsu 36.521-1 15.3.1 CR#4555 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187070 Correction to 6.2.4A.2_1 and 6.6.2.2A.2_1 CR Anritsu, CETECOM, DEKRA 36.521-1 15.3.1 CR#4556 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-187071 Editorial correction to 6.6.2.2A.2 Additional Spectrum Emission Mask for CA CR Anritsu 36.521-1 15.3.1 CR#4557 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-187072 Correction to 2x4 CA demodulation tests CR Anritsu 36.521-1 15.3.1 CR#4558 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-81

AI: 5.3.7.2

agreed [WTS] [JSN]
R5-187073 Correction to the MU for UL CA CR Anritsu 36.521-1 15.3.1 CR#4559 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-187074 Editorial: 6.2.2EC, UE Maximum Output Power for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#4560 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187075 Introduction of tc 6.2.3EC, Maximum Power Reduction (MPR) for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#4561 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187076 Introduction of tc 6.2.5EC Configured UE transmitted Power for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#4562 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187077 Introduction of tc 6.3.2EC, Minimum Output Power for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#4563 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187078 Introduction of tc 6.3.3EC, UE Transmit OFF power for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#4564 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187079 Introduction of 6.3.4EC.1, General ON/OFF time mask for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#4565 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187080 Introduction of 6.3.5EC.1, Power Control Absolute power tolerance for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#4566 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187081 Introduction of 6.3.5EC.2, Power Control Relative power tolerance for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#4567 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187082 Introduction of 6.3.5EC.3, Aggregate power control tolerance for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#4568 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187083 Test Point analysis for FR1 PRACH test case CR KTL 38.905 15.0.0 CR#32 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

withdrawn [WTS] [JSN]
R5-187084 Introduction of New test case 6.4B.2.2.1 Error Vector Magnitude for intra-band non-contiguous EN-DC CR KTL 38.521-3 15.0.0 CR#55 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187085 Introduction of New test case 6.4B.2.2.2 Carrier Leakage for intra-band non-contiguous EN-DC CR KTL 38.521-3 15.0.0 CR#56 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187086 Specifying Test procedure to check that UE is camped on a new NR cell belonging to a new TA CR Samsung 38.508-1 15.1.0 CR#357 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187087 Introduction of New test case 6.4B.2.2.3 In-band Emissions for intra-band non-contiguous EN-DC CR KTL 38.521-3 15.0.0 CR#57 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187088 Introduction of New test case 6.4B.2.3.1 Error Vector Magnitude for inter-band EN-DC within FR1 CR KTL 38.521-3 15.0.0 CR#58 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187089 Introduction of New test case 6.4B.2.3.2 Carrier Leakage for inter-band EN-DC within FR1 CR KTL, MTCC 38.521-3 15.0.0 CR#59 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187090 Introduction of New test case 6.4B.2.3.3 In-band Emissions for inter-band EN-DC within FR1 CR KTL, MTCC 38.521-3 15.0.0 CR#60 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187091 Update to FR1 test case 6.3.3.4 PRACH time mask CR KTL 38.521-1 15.0.0 CR#110 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187092 Introduction of New test case 6.6.2.2A.1_2 Additional Spectrum Emission Mask for CA (intra-band contiguous DL CA and UL CA) for UL 256QAM CR KTL 36.521-1 15.3.1 CR#4569 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187093 Introduction of New test case 6.6.2.2A.2_2 Additional Spectrum Emission Mask for CA (inter-band DL CA and UL CA) for UL 256QAM CR KTL 36.521-1 15.3.1 CR#4570 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187094 Update to Tx test cases for UL 256QAM CR KTL 36.521-1 15.3.1 CR#4571 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187095 Addition of applicability and ICS for Tx test cases for UL 256QAM CA CR KTL 36.521-2 15.3.0 CR#792 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.3

agreed [WTS] [JSN]
R5-187096 Update to 3 Tx test case for 3UL CA CR KTL 36.521-1 15.3.1 CR#4572 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-187097 Addition of applicability and ICS for Tx test cases for 3UL CA CR KTL 36.521-2 15.3.0 CR#793 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.3

withdrawn [WTS] [JSN]
R5-187098 Update TC 6.6.3G.2_1 CR

revised to R5-187866

Huawei, HiSilicon 36.521-1 15.3.1 CR#4573 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.3

revised [WTS] [JSN]
R5-187099 Inter-band con-current V2X configurations- Add 3A_47A Spurious Emission Test points analysis CR Huawei, HiSilicon 36.905 15.2.0 CR#158 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.8

revised [WTS] [JSN]
R5-187100 PRD-17 on Guidance to Work Item Codes version 3.14 (post RAN#82 version) other Rapporteur (BlackBerry) R5-81

AI: 7.3

noted [WTS] [JSN]
R5-187101 TS 36.523-1 Status before RAN5#81 other Rapporteur (BlackBerry) R5-81

AI: 6.4.6

noted [WTS] [JSN]
R5-187102 TS 36.523-1 Status after RAN5#81 other Rapporteur (BlackBerry) R5-81

AI: 6.4.6

noted [WTS] [JSN]
R5-187103 Proposed Word Template for RAN5 WI Work Plan other

revised to R5-187624

BlackBerry UK Limited R5-81

AI: 4.3

revised [WTS] [JSN]
R5-187104 Correcton to MAC test cases CR Motorola Mobility and MCC TF160 38.523-1 15.1.0 CR#229 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187105 Correction to RLC UM test cases CR Motorola Mobility, MCC TF160 38.523-1 15.1.0 CR#230 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.3

agreed [WTS] [JSN]
R5-187106 Correction to RLC AM test cases CR Motorola Mobility, MCC TF160 38.523-1 15.1.0 CR#231 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.3

agreed [WTS] [JSN]
R5-187107 Correction to PDCP Ciphering test cases CR Motorola Mobility, MCC TF160 38.523-1 15.1.0 CR#232 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.4

revised [WTS] [JSN]
R5-187108 Correcton to PDCP Integrity test cases CR Motorola Mobility and MCC TF160 38.523-1 15.1.0 CR#233 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.4

revised [WTS] [JSN]
R5-187109 Correcton to SDAP test cases CR Motorola Mobility 38.523-1 15.1.0 CR#234 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.5

revised [WTS] [JSN]
R5-187110 Correcton to default message contents for SRB3 configuration CR Motorola Mobility and MCC TF160 38.508-1 15.1.0 CR#358 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187111 Correcton to MAC TBS test cases CR Motorola Mobility and MCC TF160 38.508-1 15.1.0 CR#359 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-187112 Addition of Test Loop for SDAP testing CR Ericsson, Motorola Mobility, Samsung 38.509 15.1.0 CR#8 catB 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.3

revised [WTS] [JSN]
R5-187113 Correction of 5GC terminology CR Motorola Mobility, MCC TF160 38.509 15.1.0 CR#9 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.3

agreed [WTS] [JSN]
R5-187114 Correction to RRCConnectionReconfiguration CR Motorola Mobility, Qualcomm, Huawei, MCC TF160 36.508 15.3.0 CR#1218 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187115 Addition of PICS CR Motorola Mobility, CMCC 38.508-2 15.1.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.2

revised [WTS] [JSN]
R5-187116 Correction to Selection Expressions CR

revised to R5-188102

Motorola Mobility, MCC TF160 38.523-2 15.1.0 CR#26 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

revised [WTS] [JSN]
R5-187117 WP UE Conformance Test Aspects – 5G System Non-3GPP Access Work Plan Motorola Mobility 5GS_Ph1-CT_n3GPPA-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187118 SR UE Conformance Test Aspects – 5G System Non-3GPP Access WI summary Motorola Mobility 5GS_Ph1-CT_n3GPPA-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187119 Correction to test case 8.2.4.1 for CAT-M1 UEs CR ROHDE & SCHWARZ,Qualcomm Incorporated 36.523-1 15.3.0 CR#4680 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.2

agreed [WTS] [JSN]
R5-187120 Correction to test case 8.2.4.2 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4681 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.2

agreed [WTS] [JSN]
R5-187121 Correction to test case 8.2.4.5 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4682 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.2

agreed [WTS] [JSN]
R5-187122 Correction to test case 8.2.4.7 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4683 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.2

revised [WTS] [JSN]
R5-187123 Correction to test case 8.2.4.8 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4684 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.2

revised [WTS] [JSN]
R5-187124 Correction to test cases 8.3.1.10, 8.3.1.11a, 8.3.1.15 and 8.3.1.16 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4685 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.3

revised [WTS] [JSN]
R5-187125 Correction to test case 8.3.1.8 for CAT-M1 UEs CR ROHDE & SCHWARZ 36.523-1 15.3.0 CR#4686 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.3

agreed [WTS] [JSN]
R5-187126 Correction to test case 8.3.1.9 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4687 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.3

revised [WTS] [JSN]
R5-187127 Correction to test case 8.3.1.11 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4688 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.3

agreed [WTS] [JSN]
R5-187128 Correction to test case 9.2.2.1.9 for CAT-M UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4689 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.4

agreed [WTS] [JSN]
R5-187129 Maximum Output Power for CA CR Sprint Corporaton 36.521-1 15.3.1 CR#4574 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.1

revised [WTS] [JSN]
R5-187130 MOP for CA (intra-band contiguous DL CA and UL CA) CR Sprint Corporaton 36.521-1 15.3.1 CR#4575 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.1

withdrawn [WTS] [JSN]
R5-187131 A-MPR for CA (intra-band contiguous DL CA and UL CA) CR Sprint Corporaton 36.521-1 15.3.1 CR#4576 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.1

withdrawn [WTS] [JSN]
R5-187132 Configured UE transmitted output power for CA (intra-band contiguous DL CA and UL CA) CR Sprint Corporaton 36.521-1 15.3.1 CR#4577 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.1

withdrawn [WTS] [JSN]
R5-187133 ACLR for CA (intra-band contiguous DL CA and UL CA) CR Sprint Corporaton 36.521-1 15.3.1 CR#4578 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.1

withdrawn [WTS] [JSN]
R5-187134 Test point selection in A-MPR test cases CR Sprint Corporaton 36.905 15.2.0 CR#159 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.3

withdrawn [WTS] [JSN]
R5-187135 Applicability CR Sprint Corporaton 36.521-2 15.3.0 CR#794 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.2

withdrawn [WTS] [JSN]
R5-187136 SR - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation WI status report Sprint Corporaton LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187137 WP - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation Work Plan Sprint Corporaton LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187138 Updated RF clause 9.8 to cover Cat-M2 requirement CR Bureau Veritas 36.521-1 15.3.1 CR#4579 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

revised [WTS] [JSN]
R5-187139 Updated RRM clause 4 tests to cover Cat-M2 requirement CR Bureau Veritas 36.521-3 15.3.0 CR#2332 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

revised [WTS] [JSN]
R5-187140 Updated RRM clause 5 tests to cover Cat-M2 requirement CR Bureau Veritas 36.521-3 15.3.0 CR#2333 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

revised [WTS] [JSN]
R5-187141 Updated RRM clause 6 tests to cover Cat-M2 requirement CR Bureau Veritas 36.521-3 15.3.0 CR#2334 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

revised [WTS] [JSN]
R5-187142 Updated RRM clause 7 tests to cover Cat-M2 requirement CR Bureau Veritas 36.521-3 15.3.0 CR#2335 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

revised [WTS] [JSN]
R5-187143 Align CA information in clause 5 with TS36.101 v15.4.0 CR Bureau Veritas 36.521-1 15.3.1 CR#4580 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187144 Align CA information in clause 7.3A.0 with TS36.101 v15.4.0 CR Bureau Veritas 36.521-1 15.3.1 CR#4581 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.2.2

revised [WTS] [JSN]
R5-187145 Updated test requirement to RF clause 7 test cases for CA band CR Bureau Veritas 36.521-1 15.3.1 CR#4582 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187146 Updated to TC9.6.1.1_A.4 for 5DL CA requirement CR Bureau Veritas 36.521-1 15.3.1 CR#4583 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.2

withdrawn [WTS] [JSN]
R5-187147 Correction to test configuration table for CA band combination CR Bureau Veritas, Anritsu, SGS Wireless 36.521-1 15.3.1 CR#4584 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187148 General clauses updated for TR38.903 CR Bureau Veritas, Huawei, HiSilicon 38.903 15.0.0 CR#13 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187149 Updated to Annexes for FR1 tests CR Bureau Veritas 38.521-1 15.0.0 CR#111 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187150 General clauses updated for TS38.521-1 CR Bureau Veritas 38.521-1 15.0.0 CR#112 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

agreed [WTS] [JSN]
R5-187151 Updated to Annexes for FR2 tests CR Bureau Veritas 38.521-2 15.0.0 CR#34 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187152 General Information updated for TS38.521-2 CR Bureau Veritas 38.521-2 15.0.0 CR#35 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187153 Updated EN-DC configuration information in clause 5 CR Bureau Veritas 38.521-3 15.0.0 CR#61 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-187154 Added applicability of requirements for UEs supporting coverage enhancement CR Bureau Veritas 36.521-1 15.3.1 CR#4585 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-187155 Added ICS item for missing Category DL and UL CR Bureau Veritas 36.521-2 15.3.0 CR#795 catF TEI12_Test Rel-15 R5-81

AI: 5.4.1.3

revised [WTS] [JSN]
R5-187156 Correction to tested CA configuration selection criteria for Rx tests CR Bureau Veritas, Ericsson 36.521-2 15.3.0 CR#796 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.3

revised [WTS] [JSN]
R5-187157 Correction to RLC test case 7.2.3.13 CR ROHDE & SCHWARZ 36.523-1 15.3.0 CR#4690 catF TEI8_Test Rel-15 R5-81

AI: 6.4.3.2.2

agreed [WTS] [JSN]
R5-187158 Updates to Authentication 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#360 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187159 Updates to Configuration Update 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#361 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187160 Updates to De-registration 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#362 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187161 Updates to Identity 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#363 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187162 Updates to NAS Transport 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#364 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187163 Updates to Notification 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#365 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187164 Updates to PDU session authentication 5GSM messages CR Ericsson 38.508-1 15.1.0 CR#366 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187165 Updates to PDU session establishment 5GSM messages CR

revised to R5-187758

Ericsson 38.508-1 15.1.0 CR#367 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187166 Updates to PDU session modification 5GSM messages CR Ericsson 38.508-1 15.1.0 CR#368 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187167 Updates to PDU session release 5GSM messages CR Ericsson 38.508-1 15.1.0 CR#369 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187168 Updates to Registration 5GMM messages CR Ericsson, Rohde & Schwarz 38.508-1 15.1.0 CR#370 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187169 Updates to Security mode 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#371 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187170 Updates to Security protected 5GS NAS and 5GMM status messages CR Ericsson 38.508-1 15.1.0 CR#372 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187171 Updates to Service Request 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#373 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187172 Removal of Editor’s Notes in section 4.6.3 CR Ericsson 38.508-1 15.1.0 CR#374 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187173 Addition of new Information Elements in section 4.6.3 CR Ericsson 38.508-1 15.1.0 CR#375 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187174 Addition and updates to Information Elements in section 4.6.4 CR Ericsson 38.508-1 15.1.0 CR#376 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187175 Addition and updates to Information Elements in section 4.6.5 CR Ericsson 38.508-1 15.1.0 CR#377 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187176 New feMTC IEs CR Ericsson 36.508 15.3.0 CR#1219 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 6.3.12.1

revised [WTS] [JSN]
R5-187177 New feMTC test case 21.2.2 CR Ericsson 36.523-1 15.3.0 CR#4691 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 6.3.12.2

revised [WTS] [JSN]
R5-187178 Removal of feMTC test case 8.2.2.6.6 CR Ericsson 36.523-1 15.3.0 CR#4692 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 6.3.12.2

agreed [WTS] [JSN]
R5-187179 Updates to feMTC test case applicabilities CR Ericsson 36.523-2 15.3.0 CR#1235 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 6.3.12.3

revised [WTS] [JSN]
R5-187180 WP UE Conformance Test Aspects – Further enhanced MTC for LTE Work Plan Ericsson LTE_feMTC-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187181 SR UE Conformance Test Aspects – Further enhanced MTC for LTE WI status report Ericsson LTE_feMTC-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187182 Clarification for Cat-M1 Reference Sensitivity Test Requirement CR PCTEST Engineering Lab, Verizon, AT&T 36.521-1 15.3.1 CR#4586 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-187183 Correction to number of almanac elements for Galileo CR ROHDE & SCHWARZ, Spirent Communications 37.571-5 15.3.0 CR#193 catF TEI8_Test Rel-15 R5-81

AI: 6.5.7.4

agreed [WTS] [JSN]
R5-187184 Correction to V2V TC 24.1.4 CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4693 catF TEI14_Test, LTE_SL_V2V-UEConTest Rel-15 R5-81

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-187185 Discussion on duplicated testing of UL 64QAM and UL 256QAM in Tx test cases discussion CETECOM GmbH LTE_UL_CAP_enh-UEConTest R5-81

AI: 5.3.14.7

noted [WTS] [JSN]
R5-187186 Corrections to clause 5.5.9 of 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#14 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

revised [WTS] [JSN]
R5-187187 Change of applicability in UL 64QAM MPR and A-MPR tests due to UL 256QAM support CR CETECOM GmbH 36.521-1 15.3.1 CR#4587 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

revised [WTS] [JSN]
R5-187188 Change of applicability in UL 64QAM A-SEM and ACLR and Additional spurious tests due to UL 256QAM support CR CETECOM GmbH 36.521-1 15.3.1 CR#4588 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

revised [WTS] [JSN]
R5-187189 Corrections to clause 5.5.7.1 of 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#15 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

revised [WTS] [JSN]
R5-187190 Correction of LWA Test Case 8.2.5.8 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#4694 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

revised [WTS] [JSN]
R5-187191 Change of test point applicability in TC 6.2.3_4 due to 256QAM support CR CETECOM GmbH 36.521-1 15.3.1 CR#4589 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

withdrawn [WTS] [JSN]
R5-187192 Change of test point applicability in TC 6.2.4_2 due to 256QAM support CR CETECOM GmbH 36.521-1 15.3.1 CR#4590 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187193 Change of test point applicability in TC 6.6.2.2_1 due to 256QAM support CR CETECOM GmbH 36.521-1 15.3.1 CR#4591 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187194 Corrections to LWA TC 8.2.5.7 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#4695 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

revised [WTS] [JSN]
R5-187195 Change of test point applicability in TC 6.6.2.3_4 due to 256QAM support CR CETECOM GmbH 36.521-1 15.3.1 CR#4592 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187196 Aligning CA delta TiB in sub-clause 6.2.5.3 with TS 36.101 v15.4.0 CR Ericsson, Bureau Veritas, Anritsu 36.521-1 15.3.1 CR#4593 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

revised [WTS] [JSN]
R5-187197 Change of test point applicability in TC 6.6.3.3_1 due to 256QAM support CR CETECOM GmbH 36.521-1 15.3.1 CR#4594 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187198 Correction to GCF WI-086 EUTRA EPC Testcases 9.2.1.2.1b and 9.2.1.2.1c CR ANRITSU LTD 36.523-1 15.3.0 CR#4696 catF TEI8_Test Rel-15 R5-81

AI: 6.4.3.4

agreed [WTS] [JSN]
R5-187199 Correction of LWA Test Case 8.2.5.4 and LWIP 8.2.5.5 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#4697 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

revised [WTS] [JSN]
R5-187200 Aligning CA delta RiB in sub-clause 7.3.3 with TS 36.101 v15.4.0 CR Ericsson, Bureau Veritas, Anritsu 36.521-1 15.3.1 CR#4595 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

revised [WTS] [JSN]
R5-187201 Addition of support for LWA/LWIP Test Cases in generic procedures CR Intel Corporation (UK) Ltd 36.508 15.3.0 CR#1220 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.1

revised [WTS] [JSN]
R5-187202 Addition of new UL 256QAM test case - MPR for intra-band contiguous CR CETECOM GmbH 36.521-1 15.3.1 CR#4596 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187203 Update for Resource-lists in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#16 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

revised [WTS] [JSN]
R5-187204 Addition of new UL 256QAM test case - MPR for inter-band CR CETECOM GmbH 36.521-1 15.3.1 CR#4597 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

revised [WTS] [JSN]
R5-187205 Addition of new UL 256QAM test case - ACLR for multi cluster CR CETECOM GmbH 36.521-1 15.3.1 CR#4598 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187206 SR - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest WI status report NIST TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187207 WP - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest Work Plan NIST TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187208 Addition of new UL 256QAM test case - MPR for intra-band contiguous CR CETECOM GmbH 36.521-1 15.3.1 CR#4599 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

withdrawn [WTS] [JSN]
R5-187209 Correction to Table 5.5.1-1 in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#17 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

revised [WTS] [JSN]
R5-187210 Addition of new UL 256QAM test case - ALCR for intra-band contiguous CR CETECOM GmbH 36.521-1 15.3.1 CR#4600 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187211 Addition of new UL 256QAM test case - MPR for inter-band CR CETECOM GmbH 36.521-1 15.3.1 CR#4601 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

withdrawn [WTS] [JSN]
R5-187212 Addition of new UL 256QAM test case - ACLR for inter-band CR CETECOM GmbH 36.521-1 15.3.1 CR#4602 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187213 Correction to Table 5.5.4.10.1-1 in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#18 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

revised [WTS] [JSN]
R5-187214 Discussion on Mid test channel bandwidth in Band n257 discussion

revised to R5-188055

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187215 Update of Mid test channel bandwidth in Band n257 CR NTT DOCOMO, INC. 38.508-1 15.1.0 CR#378 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

withdrawn [WTS] [JSN]
R5-187216 Corrections to LWA/LWIP Test Cases 8.2.5.1, 8.2.5.2, 8.2.5.6 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#4698 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

revised [WTS] [JSN]
R5-187217 Corrections to Test Case 8.2.5.2 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#4699 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

withdrawn [WTS] [JSN]
R5-187218 Corrections to Test Case 8.2.5.6 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#4700 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

withdrawn [WTS] [JSN]
R5-187219 Characterization of the quality of quiet zone for 30 cm DUT size IFF discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187220 MU contribution of “Mismatch” discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187221 MU contribution of “Uncertainty of the RF power measurement" discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187222 MU contribution of "Amplifier Uncertainties" discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187223 MU contribution of “Influence of the XPD“ discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187224 Correction to measurement error contribution descriptions of XPD CR Anritsu 38.903 15.0.0 CR#14 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

withdrawn [WTS] [JSN]
R5-187225 MU contribution of "Insertion loss variation" discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187226 MU contribution of “RF leakage” discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187227 Correction to measurement error contribution descriptions of RF leakage CR Anritsu 38.903 15.0.0 CR#15 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

withdrawn [WTS] [JSN]
R5-187228 Consideration on MU contribution caused by antenna switching discussion

revised to R5-188228

Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187229 MU contribution of “gNB uncertainty on absolute level” discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187230 MU contribution of “Uncertainty of network analyzer” discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187231 MU contribution of “Mean signal level shift due to Meas.Ant directivity and AUT-position uncertainty” discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187232 MU contribution of “Influence of noise due to low SNR” discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187233 Update of MU budget tables in TR 38.903 CR Anritsu 38.903 15.0.0 CR#16 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

revised [WTS] [JSN]
R5-187234 Simplification of QoQZ characterization at out-of-band region discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187235 Consideration of TT values in different frequency ranges for FR2 discussion

revised to R5-188057

Apple Inc. Rel-15 R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187236 Update RRC TC 8.2.1.2.1 - BandwidthPart Configuration / SCG / EN-DC CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#235 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187237 Update RRC TC 8.2.2.4.1 - PSCell addition, modification and release / SCG DRB / EN-DC CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#236 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187238 Update RRC TC 8.2.2.8.1 - Bearer Modification / Handling for bearer type change with security key change / EN-DC CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#237 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187239 Update RRC TC 8.2.2.9.1 - Bearer Modification / Uplink data path / Split DRB Reconfiguration / EN-DC CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#238 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187240 Update RRC TC 8.2.3.1.1 - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#239 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-187241 Update RRC SCG failure TC 8.2.5.1.1 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#240 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.5

revised [WTS] [JSN]
R5-187242 Update RRC SCG failure TC 8.2.5.3.1 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#241 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

withdrawn [WTS] [JSN]
R5-187243 Update RRC TC 8.2.1.1.1 - UE capability transfer / Success / EN-DC CR

revised to R5-187697

Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#242 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.1

revised [WTS] [JSN]
R5-187244 Addition of 5GS SA RRC TC 8.1.1.1.1 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#243 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-187245 Addition of 5GS SA RRC TC 8.1.1.1.3 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#244 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

withdrawn [WTS] [JSN]
R5-187246 Addition of 5GS SA RRC TC 8.1.1.2.5 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#245 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-187247 Addition of 5GS SA RRC TC 8.1.5.2.1 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#246 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-187248 Correction to MAC Test case 7.1.1.1.2 Random access procedure / Successful / C-RNTI Based / Preamble selected by MAC itself CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#247 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187249 Correction to MAC Test case 7.1.1.5.3 DRX operation / Short cycle configured / Parameters configured by RRC CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#248 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187250 Correction to RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#249 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187251 Correction to RLC Test case 7.1.2.3.11 AM RLC / RLC re-establishment procedure CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#250 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.3

agreed [WTS] [JSN]
R5-187252 Correction to PDCP Test case 7.1.3.4.1 PDCP handover / Lossless handover / PDCP sequence number maintenance / PDCP status report to convey the information on missing or acknowledged PDCP SDUs at handover / In-order delivery and duplicate elimination in th CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#251 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187253 Correction to PDCP Test case 7.1.3.5.4 PDCP reordering / Maximum re-ordering delay below t-Reordering / t-Reordering timer operations CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#252 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.4

revised [WTS] [JSN]
R5-187254 Update RRC TCs 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 NR CA / NR SCell addition / modification / release / Success CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#253 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187255 Correction to EN-DC NAS test case 10.2.1.1 - Default EPS bearer context activation CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#254 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187256 Addition of 5GC TC - Initial registration / 5GS services / NSSAI handling CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#255 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-187257 Addition of Idle Mode TC - Steering of UE in roaming during registration/security check successful using List Type CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#256 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-187258 UE Capability in EN-DC discussion

revised to R5-187632

Qualcomm Europe Inc.(Spain) 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.2.1

revised [WTS] [JSN]
R5-187259 Updates to SIG OTA Calibration for FR2 CR Qualcomm Europe Inc.(Spain) 38.508-1 15.1.0 CR#379 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187260 Addition of 5GC TC - Initial registration / SMS over NAS service CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#257 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-187261 EN-DC B41_n41 update for Signaling CR Qualcomm Europe Inc.(Spain) 38.508-1 15.1.0 CR#380 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

withdrawn [WTS] [JSN]
R5-187262 Introduction of 4 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes CR LG Electronics 36.521-3 15.3.0 CR#2336 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-187263 pCR for Addition of Test Case 4.4.3.1 EN-DC FR1 timing advance adjustment accuracy pCR

revised to R5-188011

Qualcomm CDMA Technologies 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-187264 Introduction of 4 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes CR LG Electronics 36.521-3 15.3.0 CR#2337 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-187265 Introduction of 5 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes CR LG Electronics 36.521-3 15.3.0 CR#2338 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-187266 Introduction of 5 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes CR LG Electronics 36.521-3 15.3.0 CR#2339 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-187267 Editorial correction to FS3 RRM clause 8 Tests CR Anritsu 36.521-3 15.3.0 CR#2340 catF TEI13_Test, LTE_eLAA-UEConTest Rel-15 R5-81

AI: 5.4.1.4

withdrawn [WTS] [JSN]
R5-187268 CA_3A-28A - Updates of test points analysis CR KDDI Corporation 36.905 15.2.0 CR#160 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.

agreed [WTS] [JSN]
R5-187269 Addition of new TC 9.1.8.4 CR

revised to R5-188160

Starpoint, TDIA, CATT 38.523-1 15.1.0 CR#258 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187270 Updating 4.2.1 General functional requirements CR Anritsu 38.508-1 15.1.0 CR#381 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187271 Update the section for test equipment requirements for TRx CR Anritsu 38.508-1 15.1.0 CR#382 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187272 FR2 downlink signal level(38.508-1) CR Anritsu 38.508-1 15.1.0 CR#383 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187273 Consideration on MU and TT for FR2 low PSD tests discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187274 SNR estimation for low PSD tests discussion

revised to R5-188229

Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187275 Discussion of MU for occupied BW for FR1 discussion

revised to R5-187814

Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187276 Discussion of MU for occupied BW for FR2 discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187277 Introduction of receiver spurious emission tests for FR1 inter-band EN-DC CR Anritsu 38.521-3 15.0.0 CR#62 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

revised [WTS] [JSN]
R5-187278 TP analysis for receiver spurious emission tests for FR1 inter-band EN-DC CR Anritsu 38.905 15.0.0 CR#33 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

revised [WTS] [JSN]
R5-187279 Introduction of wideband intermodulation tests for FR1 inter-band EN-DC CR Anritsu 38.521-3 15.0.0 CR#63 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

revised [WTS] [JSN]
R5-187280 TP analysis for wideband intermodulation tests for FR1 inter-band EN-DC CR Anritsu 38.905 15.0.0 CR#34 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

revised [WTS] [JSN]
R5-187281 Introduction of receiver spurious emission tests for FR1 SA CR Anritsu 38.521-1 15.0.0 CR#113 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

revised [WTS] [JSN]
R5-187282 TP analysis for receiver spurious emission tests for FR1 SA CR Anritsu 38.905 15.0.0 CR#35 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

revised [WTS] [JSN]
R5-187283 Introduction of wideband intermodulation tests for FR1 SA CR Anritsu 38.521-1 15.0.0 CR#114 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

revised [WTS] [JSN]
R5-187284 TP analysis for wideband intermodulation tests for FR1 SA CR Anritsu 38.905 15.0.0 CR#36 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

revised [WTS] [JSN]
R5-187285 Updating power levels for LTE Anchor Link CR Anritsu 38.508-1 15.1.0 CR#384 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

revised [WTS] [JSN]
R5-187286 FR2 downlink signal level(38.521-2) CR Anritsu 38.521-2 15.0.0 CR#36 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187287 LTE Anchor Link configuration for FR2 CR Anritsu 38.521-2 15.0.0 CR#37 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

withdrawn [WTS] [JSN]
R5-187288 Correction to RB numbers for DFT-s-OFDM CR Anritsu 38.521-1 15.0.0 CR#166 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

withdrawn [WTS] [JSN]
R5-187289 On the test procedure for FR2 maximum input level test discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187290 On the testability issue for the FR2 TRx tests discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187291 CA_3A-28A - Updates of some Tx test cases CR KDDI Corporation 36.521-1 15.3.1 CR#4603 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187292 CA_11A-18A - Updates of test points analysis CR KDDI Corporation 36.905 15.2.0 CR#161 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.

agreed [WTS] [JSN]
R5-187293 CA_11A-18A - Updates of some Tx test cases CR KDDI Corporation 36.521-1 15.3.1 CR#4604 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187294 CA_3A-41A-42C(1UL) - Updates of test points analysis CR KDDI Corporation 36.905 15.2.0 CR#162 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.

revised [WTS] [JSN]
R5-187295 CA_3A-41A-42C(1UL) - Updates of 7.3A.9 REFSENS CR KDDI Corporation 36.521-1 15.3.1 CR#4605 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187296 Ambiguity on procedure of selecting CA configuration in SDR CA (4layer) tests discussion NTT DOCOMO, INC. LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-81

AI: 5.3.7.7

noted [WTS] [JSN]
R5-187297 CA_3A-41C-42A(1UL) - Updates of test points analysis CR KDDI Corporation 36.905 15.2.0 CR#163 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.

revised [WTS] [JSN]
R5-187298 CA_3A-41C-42A(1UL) - Updates of 7.3A.9 REFSENS CR KDDI Corporation 36.521-1 15.3.1 CR#4606 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187299 CA_3A-41C-42C(1UL) - Updates of test points analysis CR KDDI Corporation 36.905 15.2.0 CR#164 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.

revised [WTS] [JSN]
R5-187300 CA_3A-41C-42C(1UL) - Updates of 7.3A.10 REFSENS CR KDDI Corporation 36.521-1 15.3.1 CR#4607 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187301 Addition of new TC 9.1.8.6 CR

revised to R5-188161

Starpoint, TDIA, CATT 38.523-1 15.1.0 CR#259 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187302 Correction to test case 8.2.4.3.1.1 CR TDIA, CATT 38.523-1 15.1.0 CR#260 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.4

agreed [WTS] [JSN]
R5-187303 Addition of new 5GC TC 9.1.5.2.2 CR

revised to R5-188162

CATT, TDIA 38.523-1 15.1.0 CR#261 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187304 Correction of RB allocation for 3DL_CA_1A-3A-41A CR Qualcomm Incorporated 36.521-1 15.3.1 CR#4608 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

revised [WTS] [JSN]
R5-187305 Addition of new TC 9.1.8.7 CR

revised to R5-188163

Starpoint, TDIA, CATT 38.523-1 15.1.0 CR#262 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187306 Addition of new 5GC TC 9.1.6.1.1 CR CATT, TDIA 38.523-1 15.1.0 CR#263 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187307 Introduction of New FR1 test case 6.3.3.6 SRS time mask CR MTCC, KTL 38.521-1 15.0.0 CR#115 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187308 5G_FR1 Text update for 6.5.3.3 Additonal Spurious emission CR Qualcomm Incorporated 38.521-1 15.0.0 CR#116 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187309 Introduction of New FR1 test case 6.3.3.7 PUSCH-PUCCH and PUSCH-SRS time masks CR MTCC, KTL 38.521-1 15.0.0 CR#117 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187310 Editorial change to applicability condition for TC8.2.1.3.1_A.1 CR TTA 36.521-2 15.3.0 CR#797 catF TEI11_Test Rel-15 R5-81

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-187311 Addition of general test procedures for 5GC testing CR

revised to R5-188124

CATT, TDIA 38.508-1 15.1.0 CR#385 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187312 Additonal Spurious Emissions for Intra-band contiguous EN-DC CR Qualcomm Incorporated 38.521-3 15.0.0 CR#64 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187313 Additonal Spurious Emissions for Intra-band non-contiguous EN-DC CR Qualcomm Incorporated 38.521-3 15.0.0 CR#65 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187314 Addition of test applicabilities for 5GC testcases CR CATT 38.523-2 15.1.0 CR#27 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

revised [WTS] [JSN]
R5-187315 Addition of notes to clarify test point selection into general section of TS 38.521-1 CR NTT DOCOMO, INC. 38.521-1 15.0.0 CR#118 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

revised [WTS] [JSN]
R5-187316 Addition of new TC 9.1.8.11 CR

revised to R5-188164

Starpoint, TDIA, CATT 38.523-1 15.1.0 CR#264 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187317 Additonal Spurious emission for inter-band EN-DC CR Qualcomm Incorporated 38.521-3 15.0.0 CR#66 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187318 Addition of notes to clarify test point selection into general section of TS 38.521-2 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#38 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187319 Addition of notes to clarify test point selection into general section of TS 38.521-3 CR NTT DOCOMO, INC. 38.521-3 15.0.0 CR#67 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

revised [WTS] [JSN]
R5-187320 Spurious emission band UE co-existence for intra-band non-contiguous EN-DC CR Qualcomm Incorporated 38.521-3 15.0.0 CR#68 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

revised [WTS] [JSN]
R5-187321 Core alignment CR to capture TS 38.101-1 updates during RAN4#89 CR NTT DOCOMO, INC. 38.521-1 15.0.0 CR#119 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

revised [WTS] [JSN]
R5-187322 Correction to clause 9.1.1.4.2 CR TTA 36.521-1 15.3.1 CR#4609 catF TEI10_Test, LTE_4Rx_AP_DL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-187323 Core alignment CR to capture TS 38.101-2 updates during RAN4#89 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#39 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187324 Core alignment CR to capture TS 38.101-3 updates during RAN4#89 CR NTT DOCOMO, INC. 38.521-3 15.0.0 CR#69 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

revised [WTS] [JSN]
R5-187325 Addition of new 5GC TC 9.1.2.1 CR

revised to R5-188165

TDIA, CATT 38.523-1 15.1.0 CR#265 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187326 Addition of new TC 9.1.8.15 CR Starpoint,TDIA,CATT 38.523-1 15.1.0 CR#266 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-187327 Update of test case 9.6.1.1_A.4 CR TTA, Bureau Veritas 36.521-1 15.3.1 CR#4610 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.2

revised [WTS] [JSN]
R5-187328 Update the applicability of 5G NR TC 8.2.3.12.1 CR Intertek, Qualcomm 38.523-2 15.1.0 CR#28 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-187329 Introduction of Additional spurious emissions for UL 256QAM CR TTA 36.521-1 15.3.1 CR#4611 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187330 Applicability addition of test case 6.6.3.3A.1_2 CR TTA 36.521-2 15.3.0 CR#798 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.3

agreed [WTS] [JSN]
R5-187331 Addition of new UL 256QAM test case - Annex F CR CETECOM GmbH 36.521-1 15.3.1 CR#4612 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

revised [WTS] [JSN]
R5-187332 Correction of applicability statement in TC 6.2.4A.2_2 CR CETECOM GmbH 36.521-1 15.3.1 CR#4613 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

withdrawn [WTS] [JSN]
R5-187333 TP analyses for new Rel-15 CA configurations CR CETECOM GmbH 36.905 15.2.0 CR#165 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.

revised [WTS] [JSN]
R5-187334 Changing the cell configuration mapping tables to cater for RRM generic duplex mode tests CR Anritsu, Intel, ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2341 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187335 Test points and test requirements in TC 7.3A.9 for CA_2A-66C-71A and CA_2C-66A-66A CR CETECOM GmbH 36.521-1 15.3.1 CR#4614 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187336 Mismatch (40 - 60 GHz) discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187337 Addition of descriptions on new MU contributions CR

revised to R5-188059

Anritsu 38.903 15.0.0 CR#17 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

revised [WTS] [JSN]
R5-187338 Temporary discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187339 Addition of new UL 256QAM test cases - applicability CR CETECOM GmbH 36.521-2 15.3.0 CR#799 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.3

agreed [WTS] [JSN]
R5-187340 Introduction of CA_2A-66C-71A in Rx test cases CR CETECOM GmbH 36.521-1 15.3.1 CR#4615 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187341 Introduction of CA configurations CA_2A-66C-71A and CA_2C-66A-66A CR CETECOM GmbH 36.521-2 15.3.0 CR#800 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

agreed [WTS] [JSN]
R5-187342 Introduction of CA configurations CA_2A-66C-71A and CA_2C-66A-66A CR CETECOM GmbH 36.523-2 15.3.0 CR#1236 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

agreed [WTS] [JSN]
R5-187343 Correction of applicability statement in TC 6.2.4A.1 CR CETECOM GmbH 36.521-1 15.3.1 CR#4616 catF LTE_UL64QAM-UEConTest, TEI13_Test Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187344 Addition of new Rel-14 CA configurations into REFSENS test CR NTT DOCOMO, INC. 36.521-1 15.3.1 CR#4617 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187345 Addition of new Rel-15 CA configurations into REFSENS test CR NTT DOCOMO, INC. 36.521-1 15.3.1 CR#4618 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187346 Correction of applicability in TC 6.6.2.2A.2 and TC.6.6.3.3A.2 CR CETECOM GmbH 36.521-1 15.3.1 CR#4619 catF TEI13_Test Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187347 Correction for test procedure step 4 in TC 6.6.3.3A.1 CR CETECOM GmbH 36.521-1 15.3.1 CR#4620 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187348 Correction for test procedure in TC 6.6.3.3A.2 CR CETECOM GmbH 36.521-1 15.3.1 CR#4621 catF TEI11_Test Rel-15 R5-81

AI: 5.4.1.2.1

withdrawn [WTS] [JSN]
R5-187349 Correction for test procedure in TC 6.6.3.3A.1_1 CR CETECOM GmbH 36.521-1 15.3.1 CR#4622 catF LTE_UL64QAM-UEConTest, TEI13_Test Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187350 Correction for test procedure in TC 6.6.3.3A.2_1 CR CETECOM GmbH 36.521-1 15.3.1 CR#4623 catF TEI13_Test Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187351 Addition of new 5GC TC 9.1.8.13 CR

revised to R5-188166

CAICT 38.523-1 15.1.0 CR#267 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187352 Update for reference sensitivity TP analysis for CA_2A-66A-71A CA configuration CR CETECOM GmbH 36.905 15.2.0 CR#166 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.

revised [WTS] [JSN]
R5-187353 Correction in TC 7.3A.3 for CA configuration CA_2A-71A CR CETECOM GmbH 36.521-1 15.3.1 CR#4624 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

revised [WTS] [JSN]
R5-187354 Correction in TC 7.3A.5 for CA configuration CA_2A-66A-71A CR CETECOM GmbH 36.521-1 15.3.1 CR#4625 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

revised [WTS] [JSN]
R5-187355 Addition of new 5GC TC 9.1.8.17 CR

revised to R5-188167

CAICT 38.523-1 15.1.0 CR#268 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187356 Addition of 5GC test case 10.1.2.1 CR

revised to R5-188177

CATT, TDIA 38.523-1 15.1.0 CR#269 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-187357 Addition of 5GC test case 10.1.3.1 CR

revised to R5-187798

CATT, TDIA, CAICT 38.523-1 15.1.0 CR#270 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-187358 Addition of applicability of feMTC test cases CR Ericsson 36.521-2 15.3.0 CR#801 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-187359 Addition of 5GC Test case 10.1.5.1 CR

revised to R5-188178

TDIA, CATT 38.523-1 15.1.0 CR#271 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-187360 Update RRC TC 8.2.3.12.1 CR Intertek 38.523-1 15.1.0 CR#272 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-187361 Introduction of Error Vector Magnitude for intra-band contiguous EN-DC CR LG Electronics 38.521-3 15.0.0 CR#70 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187362 Introduction of Carrier Leakage for intra-band contiguous EN-DC CR LG Electronics 38.521-3 15.0.0 CR#71 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187363 Corrections to TC 7.3A.5 CR Rohde & Schwarz 36.521-1 15.3.1 CR#4626 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-187364 Correction to general clause 7.1 CR Rohde & Schwarz 36.521-1 15.3.1 CR#4627 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-187365 Corrections to eMTC CQI Test Cases CR Rohde & Schwarz 36.521-1 15.3.1 CR#4628 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-187366 Introduction of In-band Emissions for intra-band contiguous EN-DC CR LG Electronics 38.521-3 15.0.0 CR#72 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187367 Update of V2X RF Receiver Test Cases for Intra-band contiguous CR SGS Wireless 36.521-1 15.3.1 CR#4629 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.3

revised [WTS] [JSN]
R5-187368 Addition of TC6.3B.3.1 Tx ON/OFF time mask for intra-band contiguous EN-DC CR SGS Wireless 38.521-3 15.0.0 CR#73 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187369 Addition of TC6.3B.3.2 Tx ON/OFF time mask for intra-band non-contiguous EN-DC CR SGS Wireless 38.521-3 15.0.0 CR#74 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187370 Addition of TC6.3B.3.3 Tx ON/OFF time mask for inter-band EN-DC within FR1 CR SGS Wireless 38.521-3 15.0.0 CR#75 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187371 Addition of TC6.3B.2.1 Transmit OFF Power for intra-band contiguous EN-DC CR SGS Wireless 38.521-3 15.0.0 CR#76 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187372 Addition of TC6.3B.2.3 Transmit OFF Power for inter-band EN-DC within FR1 CR SGS Wireless 38.521-3 15.0.0 CR#77 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187373 Addition of TC6.3B.2.2 Transmit OFF Power for intra-band non-contiguous EN-DC CR SGS Wireless 38.521-3 15.0.0 CR#78 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187374 Correction to Contact header in MT INVITE CR ROHDE & SCHWARZ, Qualcomm Incorporated 34.229-1 14.4.0 CR#1299 catF TEI8_Test Rel-14 R5-81

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-187375 Discussion on LS on FGI bit 103 and 104 discussion

revised to R5-187623

Huawei, HiSilicon, CMCC, CATT R5-81

AI: 4.2.2

revised [WTS] [JSN]
R5-187376 Update of 6.2.1 MOP CR Huawei, HiSilicon 38.521-1 15.0.0 CR#120 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187377 Update of 6.2.4 Configured Output Power CR Huawei, HiSilicon 38.521-1 15.0.0 CR#121 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-187378 Update of 6.3.1 Minimum Output Power CR Huawei, HiSilicon 38.521-1 15.0.0 CR#122 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187379 Update of 6.3.3.2 General ON/OFF time mask CR Huawei, HiSilicon 38.521-1 15.0.0 CR#123 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187380 Addition of 6.2D.1 MOP for MIMO CR Huawei, HiSilicon 38.521-1 15.0.0 CR#124 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187381 Addition of 6.2D.2 MPR for MIMO CR Huawei, HiSilicon 38.521-1 15.0.0 CR#125 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187382 Addition of 6.2D.4 Configured Output Power for MIMO CR Huawei, HiSilicon 38.521-1 15.0.0 CR#126 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187383 Addition of 6.4D.1 Frequency error for MIMO CR Huawei, HiSilicon 38.521-1 15.0.0 CR#127 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187384 Addition of 6.4D.2.1 EVM for MIMO CR Huawei, HiSilicon 38.521-1 15.0.0 CR#128 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187385 Addition of 6.4D.2.2 Carrier Leakage for MIMO CR Huawei, HiSilicon 38.521-1 15.0.0 CR#129 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187386 Addition of 6.4D.2.3 In-band emissions for MIMO CR Huawei, HiSilicon 38.521-1 15.0.0 CR#130 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187387 Addition of 6.4D.2.4 EVM equalizer spectrum flatness for MIMO CR Huawei, HiSilicon 38.521-1 15.0.0 CR#131 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187388 Adding test frequencies for EN-DC DC_(n)71AA and DC_(n)41AA CR Huawei, HiSilicon 38.508-1 15.1.0 CR#386 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

withdrawn [WTS] [JSN]
R5-187389 Removing editor’s note in FDD 5DL CA test cases CR Huawei, HiSilicon, Bureau Veritas, SGS 36.521-1 15.3.1 CR#4630 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187390 Update CSI related information elements CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#387 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

withdrawn [WTS] [JSN]
R5-187391 On RRM test frequency selection for FR1 and FR2 discussion

revised to R5-188004

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187392 Applicability for NR NSA Option 3 protocol tests CR

revised to R5-187727

ROHDE & SCHWARZ 37.571-3 15.3.0 CR#105 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.16

revised [WTS] [JSN]
R5-187393 Addition of Cat. M2 Support to RRM CE tests - Chapter 8 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2342 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-187394 Addition of Cat. M2 Support to RRM CE tests - Chapter 9 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#2343 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-187395 Update of test case 6.2.3 UE A-MPR, general CR Ericsson-LG Co., LTD 38.521-1 15.0.0 CR#132 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187396 Update of TR 38.905 with SA FR1 A-MPR test point analyses, NS_04 CR Ericsson-LG Co., LTD 38.905 15.0.0 CR#37 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-187397 Update of test case 6.2.3 UE A-MPR, NS_04 CR Ericsson-LG Co., LTD 38.521-1 15.0.0 CR#133 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187398 Update of TR 38.905 with SA FR1 Additional spectrum emission mask NS_04 test point analyses CR Ericsson-LG Co., LTD 38.905 15.0.0 CR#38 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

withdrawn [WTS] [JSN]
R5-187399 Update of test case test case 6.5.2.3 Additional spectrum emission mask, NS_04 CR Ericsson-LG Co., LTD 38.521-1 15.0.0 CR#134 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187400 Update of TR 38.905 with EN-DC A-MPR test point analyses, NS_04 CR Ericsson-LG Co., LTD 38.905 15.0.0 CR#39 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

revised [WTS] [JSN]
R5-187401 Update of test case 6.2B.3.1 UE A-MPR for Intra-band contiguous EN-DC for NS_04 CR Ericsson-LG Co., LTD 38.521-1 15.0.0 CR#135 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

withdrawn [WTS] [JSN]
R5-187402 Update of TR 38.905 with EN-DC A-MPR test point analyses, NS_04 non-contigous CR Ericsson-LG Co., LTD 38.905 15.0.0 CR#40 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

withdrawn [WTS] [JSN]
R5-187403 New RRM 5G Test Cases 4.6.2.1 – 4.6.2.8 pCR

revised to R5-187997

Ericsson 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-187404 New RRM 5G Test Cases 5.6.2.1 – 5.6.2.4 pCR

revised to R5-187998

Ericsson 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-187405 New RRM 5G Test Cases 6.6.2.1 – 6.6.2.8 pCR

revised to R5-187999

Ericsson 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-187406 New RRM 5G Test Cases 7.6.2.1 – 7.6.2.4 pCR

revised to R5-188000

Ericsson 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-187407 Update of test case 6.2B.3.2 UE A-MPR for Intra-band non-contigous EN-DC for NS_04 CR Ericsson-LG Co., LTD 38.521-3 15.0.0 CR#79 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

withdrawn [WTS] [JSN]
R5-187408 Update of test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC for NS_04 CR Ericsson-LG Co., LTD 38.521-3 15.0.0 CR#80 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187409 Update of test case 6.2B.3.1 UE A-MPR for Intra-band contiguous EN-DC for NS_04 CR Ericsson-LG Co., LTD 38.521-3 15.0.0 CR#81 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187410 Update of 5GS NR RRC test case 8.2.2.6.1 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#273 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187411 Addition of 5GS NR MAC test case 7.1.1.3.9 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#274 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187412 Addition of 5GS related new EFs to Test UICC definition CR ROHDE & SCHWARZ 38.508-1 15.1.0 CR#388 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

revised [WTS] [JSN]
R5-187413 Uplink RNTI to valid value in TS 38.508-1 CR Keysight Technologies UK Ltd 38.508-1 15.1.0 CR#389 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.1

agreed [WTS] [JSN]
R5-187414 Addition of 5GS NR RRC test case 8.1.1.3.2 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#275 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-187415 Update maxPayloadMinus1 in PUCCH config in TS 38.508-1 CR Keysight Technologies UK Ltd 38.508-1 15.1.0 CR#390 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.1

agreed [WTS] [JSN]
R5-187416 Addition of PICS Mnemonic for ECT CR ROHDE & SCHWARZ, Qualcomm Incorporated, Intel 34.229-2 14.4.0 CR#249 catF TEI8_Test Rel-14 R5-81

AI: 6.5.6.2

agreed [WTS] [JSN]
R5-187417 Addition of ReportConfigInterRAT for NR CR Intertek 36.508 15.3.0 CR#1221 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

revised [WTS] [JSN]
R5-187418 Addition of 2TX_UL_MIMO condition CR Huawei, Hisilicon 38.508-1 15.1.0 CR#391 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

revised [WTS] [JSN]
R5-187419 Addition of SUL condition CR

revised to R5-187889

Huawei, Hisilicon 38.508-1 15.1.0 CR#392 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-187420 Addition of connection diagram for 2 TX UL MIMO CR Huawei, Hisilicon 38.508-1 15.1.0 CR#393 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187421 Introduction of TC 6.5D.1 Occupied bandwidth for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#136 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187422 Introduction of TC 6.5D.2.2 Spectrum Emission Mask for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#137 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187423 Introduction of TC 6.5D.2.3 Additional Spectrum Emission Mask for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#138 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187424 Introduction of TC 6.5D.2.4.1 NR ACLR for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#139 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187425 Introduction of TC 6.5D.2.4.2 UTRA ACLR for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#140 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187426 Introduction of TC 6.5D.3.2 General spurious emissions for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#141 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

withdrawn [WTS] [JSN]
R5-187427 Introduction of TC 6.5D.3.3 Spurious Emission for UE co-existence for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#142 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

withdrawn [WTS] [JSN]
R5-187428 Introduction of TC 6.5D.3.4 Additional Spurious Emission for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#143 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

withdrawn [WTS] [JSN]
R5-187429 Introduction of TC 6.5D.4 Transmit intermodulation for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#144 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187430 Introduction of TC 7.3D Reference sensitivity for UL-MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#145 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

revised [WTS] [JSN]
R5-187431 Introduction of TC 7.4D Maximum input level for UL-MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#146 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187432 Updation of 6.2C.1 Configured transmitted power for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#147 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187433 Introduction of TC 6.5C.1 Occupied bandwidth for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#148 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187434 Introduction of TC 6.5C.2.2 Spectrum Emission Mask for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#149 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187435 Introduction of TC 6.5C.2.3 Additional Spectrum Emission Mask for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#150 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187436 Introduction of TC 6.5C.2.4.1 NR ACLR for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#151 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187437 Introduction of TC 6.5C.2.4.2 UTRA ACLR for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#152 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187438 Introduction of TC 6.5C.3.2 General spurious emissions for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#153 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187439 Introduction of TC 6.5C.3.3 Spurious Emission for UE co-existence for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#154 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187440 Introduction of TC 6.5C.3.4 Additional Spurious Emission for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#155 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187441 Introduction of TC 6.5C.4 Transmit intermodulation for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#156 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

revised [WTS] [JSN]
R5-187442 Updation of Uplink channel for SUL in Annex A CR Huawei, Hisilicon 38.521-1 15.0.0 CR#157 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

withdrawn [WTS] [JSN]
R5-187443 Update TC 7.4B.3 CR Huawei, Hisilicon 38.521-3 15.0.0 CR#82 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

revised [WTS] [JSN]
R5-187444 Introduction of RRM TC 4.2.25 CR Bureau Veritas 36.521-3 15.3.0 CR#2344 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-187445 Introduction of RRM TC 4.2.26 CR Bureau Veritas 36.521-3 15.3.0 CR#2345 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-187446 Introduction of RRM TC 4.2.27 CR Bureau Veritas 36.521-3 15.3.0 CR#2346 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-187447 Addition of Rel-13 CA configurations CR Ericsson 36.508 15.3.0 CR#1222 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.1

agreed [WTS] [JSN]
R5-187448 Addition of Rel-13 CA configurations CR Ericsson 36.521-2 15.3.0 CR#802 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.3

agreed [WTS] [JSN]
R5-187449 Addition of Rel-13 CA configurations CR Ericsson 36.523-2 15.3.0 CR#1237 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 6.3.2.3

agreed [WTS] [JSN]
R5-187450 Inter-band con-current V2X configurations- Add 5A_47A Spurious Emission Test points analysis CR Huawei, HiSilicon 36.905 15.2.0 CR#167 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.8

revised [WTS] [JSN]
R5-187451 Inter-band con-current V2X configurations- Add 8A_47A Spurious Emission Test points analysis CR Huawei, HiSilicon 36.905 15.2.0 CR#168 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.8

withdrawn [WTS] [JSN]
R5-187452 Inter-band con-current V2X configurations- Add 71A_47A Spurious Emission Test points analysis CR Huawei, HiSilicon 36.905 15.2.0 CR#169 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.8

agreed [WTS] [JSN]
R5-187453 Addition of default QoS configurations CR Ericsson 38.508-1 15.1.0 CR#394 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187454 On Quality of Quiet Zone Evaluation for Spurious Emissions Test Cases discussion

revised to R5-188230

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187455 Updating test case 6.3.4.2 Absolute Power Tolerance CR Intel Corporation (UK) Ltd 38.521-1 15.0.0 CR#158 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187456 Updating test case 6.3.4.4 Aggregate Power Tolerance CR Intel Corporation (UK) Ltd 38.521-1 15.0.0 CR#159 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187457 Adding TT to Aggregate Power Tolerance TC CR

revised to R5-188036

Intel Corporation (UK) Ltd 38.521-1 15.0.0 CR#160 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187458 MCPTT: Updates to common type definitions CR MCC TF160 34.229-3 14.4.0 CR#591 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.13

agreed [WTS] [JSN]
R5-187459 Discussion on MU and TT for SA FR1 UL MIMO test cases discussion Huawei, Hisilicon R5-81

AI: 5.3.10.12

withdrawn [WTS] [JSN]
R5-187460 Discussion on effects on MOP test imposed by power sharing mechanism discussion Huawei, Hisilicon R5-81

AI: 5.3.10.12

withdrawn [WTS] [JSN]
R5-187461 Editorial Changes for TS 37.571-1 CR PCTEST Engineering Lab 37.571-1 15.3.0 CR#277 catF TEI15_Test Rel-15 R5-81

AI: 5.5.9

revised [WTS] [JSN]
R5-187462 On RRM FR2 open points discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187463 Applicability for RRM NR tests CR ROHDE & SCHWARZ 38.522 15.0.0 CR#15 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.8

revised [WTS] [JSN]
R5-187464 New ICS for RRM NR tests CR ROHDE & SCHWARZ 38.508-2 15.1.0 CR#12 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.2

withdrawn [WTS] [JSN]
R5-187465 Editorial Changes for TS 37.571-3 CR PCTEST Engineering Lab 37.571-3 15.3.0 CR#106 catF TEI15_Test Rel-15 R5-81

AI: 5.5.

agreed [WTS] [JSN]
R5-187466 Clarification to RRM TCs with “No requirement applies” CR Intel Corporation (UK) Ltd 34.121-1 15.2.0 CR#1657 catF TEI9_Test Rel-15 R5-81

AI: 5.5.2

agreed [WTS] [JSN]
R5-187467 New WID: Conformance test for Shortened TTI and processing time for LTE WID new

revised to R5-187630

Huawei, Hisilicon R5-81

AI: 4.1

revised [WTS] [JSN]
R5-187468 Editorial Changes for TS 37.571-5 CR PCTEST Engineering Lab 37.571-5 15.3.0 CR#194 catF TEI15_Test Rel-15 R5-81

AI: 5.5.11

agreed [WTS] [JSN]
R5-187469 Discussion on LTE/NR power sharing in EN-DC for none anchor agnostic approach discussion

revised to R5-187920

Ericsson 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187470 Correction of TC 8.16.83, 8.16.84, 8.16.85 and 8.16.86 CR Intel Corporation (UK) Ltd 36.521-3 15.3.0 CR#2347 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187471 Update IE CellGroupConfig CR Ericsson 38.508-1 15.1.0 CR#395 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187472 RRM Generic 3DL CA tests – Annex F CR Intel Corporation (UK) Ltd 36.521-3 15.3.0 CR#2348 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187473 MU for UL 256QAM EVM test cases updated CR Ericsson 36.521-1 15.3.1 CR#4631 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187474 5GS S-NSSAI discussion Ericsson R5-81

AI: 6.3.9.19

noted [WTS] [JSN]
R5-187475 Update of test applicability condition for TC8.2.1.4.2_A.4 CR SGS Wireless 36.521-2 15.3.0 CR#803 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.3

withdrawn [WTS] [JSN]
R5-187476 Introduction of FD-MIMO test case: FDD PMI Reporting with 12Tx Class A codebook – PUSCH 3-1 (Single PMI) for FD-MIMO CR Ericsson 36.521-1 15.3.1 CR#4632 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-81

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-187477 Introduction of FD-MIMO test cases in Annexes CR Ericsson 36.521-1 15.3.1 CR#4633 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-81

AI: 5.3.11.2

revised [WTS] [JSN]
R5-187478 Introduction of FD-MIMO test cases in 36.521-2 CR Ericsson 36.521-2 15.3.0 CR#804 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-81

AI: 5.3.11.3

agreed [WTS] [JSN]
R5-187479 Testing of fallback CA configurations in Rx CA test cases other than REFSENS discussion

revised to R5-187864

Ericsson LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.11

revised [WTS] [JSN]
R5-187480 Discussion on improved measurement uncertainty for ON/OFF time mask test case discussion Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187481 Updates to maximum output power test cases CR

revised to R5-187837

Ericsson 38.521-2 15.0.0 CR#40 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

revised [WTS] [JSN]
R5-187482 Discussion on system critical requirements discussion Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187483 Test Point analysis for FR2 Maximum Output Power CR Ericsson 38.905 15.0.0 CR#41 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

revised [WTS] [JSN]
R5-187484 WP UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports Work Plan Ericsson LTE_4Rx_AP_DL_CA-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187485 SR UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports WI status report Ericsson LTE_4Rx_AP_DL_CA-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187486 WP UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE Work Plan Ericsson LTE_EBF_FDMIMO-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187487 SR UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE WI status report Ericsson LTE_EBF_FDMIMO-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187488 Updating test case 6.6.2.2 Additional spectrum emission mask and test case 6.6.3.3 Additional spurious emission CR Intel Corporation (UK) Ltd 36.521-1 15.3.1 CR#4634 catF TEI14_Test Rel-15 R5-81

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-187489 TP analysis for FR1 test case 6.3.4.3, relative power tolerance CR Ericsson France 38.905 15.0.0 CR#42 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-187490 Update of 5GS NR RRC test case 8.2.3.6.1 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#276 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-187491 Update of 5GS NR RRC test case 8.2.3.8.1 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#277 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-187492 Correction to test case 8.2.2.1.1 CR MediaTek Inc., TDIA, CATT 38.523-1 15.1.0 CR#278 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.2

agreed [WTS] [JSN]
R5-187493 Updating test case 6.2.4A.2 Additional Maximum Power Reduction (A-MPR) for CA (inter-band DL CA and UL CA) CR Intel Corporation (UK) Ltd 36.521-1 15.3.1 CR#4635 catF TEI12_Test Rel-15 R5-81

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-187494 Update of test case 6.3.4.3, Power Control Relative power tolerance in 38.521-1 CR Ericsson 38.521-1 15.0.0 CR#161 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187495 Correction to Reference Sensitivity Level "Tested Bands / CA-Configurations Selection" CR Intel Corporation (UK) Ltd 36.521-2 15.3.0 CR#805 catF TEI8_Test Rel-15 R5-81

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-187496 WP – UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE Work Plan Intel Corporation (UK) Ltd LTE_IM_DLCCH-UEConTest Rel-13 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187497 Correction to test case 8.2.2.3.1 CR MediaTek Inc., TDIA, CATT 38.523-1 15.1.0 CR#279 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.2

agreed [WTS] [JSN]
R5-187498 SR- UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE WI status report Intel Corporation (UK) Ltd LTE_IM_DLCCH-UEConTest Rel-13 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187499 Adding applicability of test cases 8.2.2.1.1 and 8.2.2.3.1 CR MediaTek Inc. 38.523-2 15.1.0 CR#29 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

agreed [WTS] [JSN]
R5-187500 WP – UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Work Plan Intel Corporation (UK) Ltd LTE_WLAN_radio-UEConTest Rel-13 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187501 SR- UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Enhancements WI status report Intel Corporation (UK) Ltd LTE_WLAN_radio-UEConTest Rel-13 R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187502 SR UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 WI status report Ericsson LTE_bands_R15_M2_NB2-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187503 WP UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 Work Plan Ericsson LTE_bands_R15_M2_NB2-UEConTest R5-81

AI: 7.4.2

reserved [WTS] [JSN]
R5-187504 SR UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) WI status report Ericsson LTE_UL_CAP_enh-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187505 Correction to test case 7.1.2.12 CR MediaTek Inc. 36.523-1 15.3.0 CR#4701 catF TEI14_Test, LTE_SRS_switch-UEConTest Rel-15 R5-81

AI: 6.4.3.2.1

revised [WTS] [JSN]
R5-187506 WP UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) Work Plan Ericsson LTE_UL_CAP_enh-UEConTest R5-81

AI: 7.4.2

noted [WTS] [JSN]
R5-187507 Corrections to Test frequencies for CA contiguous Intra-band operation CR Intel Corporation (UK) Ltd 36.508 15.3.0 CR#1223 catF TEI12_Test Rel-15 R5-81

AI: 5.4.1.1

withdrawn [WTS] [JSN]
R5-187508 Correction to Table 5.5.4.2-1 in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#19 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

revised [WTS] [JSN]
R5-187509 Update of 5GS NR RRC test case 8.2.1.1.1 CR

revised to R5-187791

ROHDE & SCHWARZ, Qualcomm 38.523-1 15.1.0 CR#280 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.1

revised [WTS] [JSN]
R5-187510 Correction to NR MAC test case 7.1.1.3.2 CR Keysight Technologies UK Ltd 38.523-1 15.1.0 CR#281 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-187511 Addition of NR MAC test case 7.1.1.3.2b CR Keysight Technologies UK Ltd 38.523-1 15.1.0 CR#282 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-187512 Adding test case 6.1.1.7 CR MediaTek Inc. 38.523-1 15.1.0 CR#283 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-187513 Update IFF MU budget in TR 38.903 CR Keysight Technologies UK Ltd 38.903 15.0.0 CR#18 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

withdrawn [WTS] [JSN]
R5-187514 Adding test case 6.1.1.8 CR MediaTek Inc. 38.523-1 15.1.0 CR#284 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

revised [WTS] [JSN]
R5-187515 On Quality of Quiet Zone Evaluation for OBW Test Case discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187516 On Quality of Quiet Zone Evaluation for SEM Test Case discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187517 On Quality of Quiet Zone Evaluation for ACLR Test Case discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187518 Beam peak measurement uncertainties discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187519 Adding new test case applicability CR MediaTek Inc. 38.523-2 15.1.0 CR#30 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

revised [WTS] [JSN]
R5-187520 Spherical coverage uncertainties discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187521 TRP uncertainties correction discussion

revised to R5-188062

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187522 On measurement grids CR

revised to R5-187921

Keysight Technologies UK Ltd 38.521-2 15.0.0 CR#41 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187523 Correction to the conditions of test cases 8.3.7, 8.3.8 and 8.3.9 CR CGC Inc. 36.521-2 15.3.0 CR#806 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.5

withdrawn [WTS] [JSN]
R5-187524 Correction to SIP NOTIFY message in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#20 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

revised [WTS] [JSN]
R5-187525 On conducted measurements uncertainties discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187526 Correction to SIP SUBSCRIBE message in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#21 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

revised [WTS] [JSN]
R5-187527 Update to test configuration table in test case 6.6.2.3A.2_1 for UL 12A-66A CR CGC Inc. 36.521-1 15.3.1 CR#4636 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-187528 Update to RRC TC - PSCell addition, modification and release / Split DRB / EN-DC CR Qualcomm Incorporated 38.523-1 15.1.0 CR#285 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187529 Update of Generic Test 5.3.2 in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#22 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

revised [WTS] [JSN]
R5-187530 Update to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / RSRQ based measurements / EN-DC CR Qualcomm Incorporated 38.523-1 15.1.0 CR#286 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187531 New Test Case in section 10.2 of TS 36.523-1 CR NIST 36.523-1 15.3.0 CR#4702 catF TEI14_Test Rel-15 R5-81

AI: 6.4.3.5

revised [WTS] [JSN]
R5-187532 Update of applicability for QCI 66 in 36.523-2 CR NIST 36.523-2 15.3.0 CR#1238 catF TEI14_Test Rel-15 R5-81

AI: 6.4.4

revised [WTS] [JSN]
R5-187533 Correction to Table 6.6.2-1 in 36.508 CR NIST, Samsung 36.508 15.3.0 CR#1224 catF TEI13_Test, MCPTT-ConTest Rel-15 R5-81

AI: 6.5.9.6

revised [WTS] [JSN]
R5-187534 Update to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of NR cells / EN-DC CR Qualcomm Incorporated 38.523-1 15.1.0 CR#287 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187535 Update the parameters to test cases 7.6.1A.1, 7.6.1A.2, 7.6.1A.3 and 7.6.1A.4 CR CGC Inc. 36.521-1 15.3.1 CR#4637 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-187536 Update to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC CR Qualcomm Incorporated 38.523-1 15.1.0 CR#288 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-187537 Update test case to cover band 46 for test cases 7.6.1A.7 and 7.6.1A.8 CR CGC Inc. 36.521-1 15.3.1 CR#4638 catF TEI11_Test Rel-15 R5-81

AI: 5.4.1.2.2

revised [WTS] [JSN]
R5-187538 Update to test cases 7.6.1A.5 CR CGC Inc. 36.521-1 15.3.1 CR#4639 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.2.2

revised [WTS] [JSN]
R5-187539 Update to 5G-NR RRC measurement report TCs for FR1/FR2 cell power level CR Qualcomm Incorporated, Tech Mahindra, Intertek, Anritsu, Rohde & Schwarz 38.523-1 15.1.0 CR#289 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-187540 Update to 5G-NR RRC TCs for Multi-PDN support and specific message content IEs CR Qualcomm Incorporated 38.523-1 15.1.0 CR#290 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187541 Update test case to cover band 46 for test cases 7.5A.7 and 7.5A.8 CR CGC Inc. 36.521-1 15.3.1 CR#4640 catF TEI11_Test Rel-15 R5-81

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-187542 Correction to test case applicability for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-2 15.3.0 CR#1239 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.4

agreed [WTS] [JSN]
R5-187543 Update of 5G-NR test cases applicability CR

revised to R5-188100

Qualcomm Incorporated, Motorola Mobility, MCC TF160, Huawei, HiSilicon, Rohde & Schwarz, Intertek 38.523-2 15.1.0 CR#31 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

revised [WTS] [JSN]
R5-187544 Correction to test case 8.2.4.27 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#4703 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.2

agreed [WTS] [JSN]
R5-187545 Correction to test case 7.1.7.1.9 and 7.1.7.1.10 CR ROHDE & SCHWARZ 36.523-1 15.3.0 CR#4704 catF TEI12_Test, LTE_SC_enh_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.2.1

agreed [WTS] [JSN]
R5-187546 Addition of 5GS NR MAC test case 7.1.1.8.1 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#291 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-187547 Addition of new 5G-NR Idle Mode TC 6.1.1.6 - PLMN selection / Periodic reselection / MinimumPeriodicSearchTimer CR Qualcomm Incorporated 38.523-1 15.1.0 CR#292 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-187548 Addition of new 5G-NR Idle Mode TC 6.1.2.15 - Speed-dependent cell reselection CR Qualcomm Incorporated 38.523-1 15.1.0 CR#293 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-187549 Update of 5G-NR SA test cases applicability CR Qualcomm Incorporated 38.523-2 15.1.0 CR#32 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-187550 Correction to 8.3.1.x measurement TCs with Cat-M1 device. CR ANRITSU LTD 36.523-1 15.3.0 CR#4705 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3

revised [WTS] [JSN]
R5-187551 FR2_UE_RSRPB_Function_38.509 CR Qualcomm CDMA Technologies 38.509 15.1.0 CR#10 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.3

withdrawn [WTS] [JSN]
R5-187552 Updates to TS 38.521-3 common sections 1-4 to align with core spec CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#83 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187553 Update eLAA test case 7.1.4.31 CR Qualcomm Incorporated 36.523-1 15.3.0 CR#4706 catF TEI14_Test, LTE_eLAA-UEConTest Rel-15 R5-81

AI: 6.4.3.2.1

revised [WTS] [JSN]
R5-187554 Removal of Multi-Layer eHRPD test cases 13.4.4.2 and 13.4.4.3 CR Qualcomm Incorporated 36.523-1 15.3.0 CR#4707 catF TEI9_Test Rel-15 R5-81

AI: 6.4.3.8

agreed [WTS] [JSN]
R5-187555 Removal of eHRPD test cases applicability CR Qualcomm Incorporated 36.523-2 15.3.0 CR#1240 catF TEI9_Test Rel-15 R5-81

AI: 6.4.4

agreed [WTS] [JSN]
R5-187556 Update of TC 5.1 in 36.579-2 CR NIST, Samsung 36.579-2 14.0.0 CR#21 catF MCImp-UEConTest Rel-14 R5-81

AI: 6.5.9.2

revised [WTS] [JSN]
R5-187557 Addition of low and high test channel bandwidth in 38.508 CR Qualcomm Japan Inc 38.508-1 15.1.0 CR#396 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187558 Update of test case 6.2.1.4 applicability CR Qualcomm Incorporated 36.523-2 15.3.0 CR#1241 catF TEI8_Test Rel-15 R5-81

AI: 6.4.4

revised [WTS] [JSN]
R5-187559 Updates to TS 38.521-3 Section 5 to align with core spec CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#84 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187560 Update to Table 5.3.5-1 in TS 38.521-1 CR Qualcomm Japan Inc 38.521-1 15.0.0 CR#162 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187561 Update to Table 5.3.5-1 in TS 38.521-2 CR Qualcomm Japan Inc 38.521-2 15.0.0 CR#42 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187562 Update to TC6.5B.3.2.1 - General Spurious Emissions for intra-band non-contiguous EN-DC CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#85 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187563 Update to 7.3B.2.2 - REFSENS for Intra-band Non-Contiguous EN-DC CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#86 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187564 Update to applicability condition of measurement reporting test cases for CAT-M1 UEs CR Qualcomm Incorporated 36.523-2 15.3.0 CR#1242 catF TEI8_Test Rel-15 R5-81

AI: 6.4.4

agreed [WTS] [JSN]
R5-187565 Updates to TS 38.521-3 Section 4 with LTE anchor details CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#87 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187566 Update note in section 4.1 to include CBW and SCS in RF test applicability CR Qualcomm Japan Inc 38.522 15.0.0 CR#16 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187567 Corrections to IMS WLAN test case G.17.2 CR Qualcomm Incorporated 34.229-1 14.4.0 CR#1300 catF TEI11_Test, MTSI_WLAN-UEConTest Rel-14 R5-81

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-187568 Discussion on FR2 Test Tolerance values discussion Qualcomm Inc, Verizon Wireless 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187569 Discussion on TS38.521-2 Annex K restructuring discussion

revised to R5-188232

Qualcomm Austria RFFE GmbH 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187570 new TC for PDSCH FR2 demod pCR

revised to R5-188008

Qualcomm Finland RFFE Oy 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

revised [WTS] [JSN]
R5-187571 Update to Annex K CR Qualcomm Austria RFFE GmbH 38.521-2 15.0.0 CR#43 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187572 FR2 General Spurious Emission test case update CR Qualcomm Austria RFFE GmbH 38.521-3 15.0.0 CR#88 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

revised [WTS] [JSN]
R5-187573 section 3 of 38.521-4 spec pCR Qualcomm Finland RFFE Oy 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

approved [WTS] [JSN]
R5-187574 FR2 Reference Sensitivity test case update CR Qualcomm Austria RFFE GmbH 38.521-3 15.0.0 CR#89 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

revised [WTS] [JSN]
R5-187575 Updates to Annex B to add Permitted OTA Test Methods CR PCTEST Engineering Lab 38.508-1 15.1.0 CR#397 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

revised [WTS] [JSN]
R5-187576 Proposal on Test Tolerance in FR2 RF discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187577 Review on test point analysis in NR RF tests discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

withdrawn [WTS] [JSN]
R5-187578 TP for addition of NR RRM TC 4.4.1.1 EN-DC FR1 UE transmit timing accuracy pCR

revised to R5-188001

Qualcomm Japan Inc 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

revised [WTS] [JSN]
R5-187579 Quality of quiet zone discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187580 Update of Global In-channel Tx Test Annex in 38.521-1 CR ROHDE & SCHWARZ 38.521-1 15.0.0 CR#163 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

revised [WTS] [JSN]
R5-187581 Update of Global In-channel Tx Test Annex in 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#44 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187582 Discussion on test point selection for EVM in FR2 CR ROHDE & SCHWARZ 38.905 15.0.0 CR#43 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187583 Discussion on test point selection for Carrier Leakage in FR2 CR ROHDE & SCHWARZ 38.905 15.0.0 CR#44 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187584 Update of test point selection for EVM equalizer spectrum flatness in FR1 CR ROHDE & SCHWARZ 38.905 15.0.0 CR#45 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187585 Update of transmit signal quality test cases in 38.521-1 CR ROHDE & SCHWARZ 38.521-1 15.0.0 CR#164 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187586 Update of transmit signal quality test cases in 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#45 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

revised [WTS] [JSN]
R5-187587 Discussion on test point selection for In-band Emissions in FR2 CR ROHDE & SCHWARZ 38.905 15.0.0 CR#46 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187588 Addition of In-band Emissions test case to TS 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#46 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

revised [WTS] [JSN]
R5-187589 Discussion on test point selection for EVM equalizer spectrum flatness in FR2 CR ROHDE & SCHWARZ 38.905 15.0.0 CR#47 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187590 Addition of EVM equalizer spectral flatness test cases 6.4.2.4 and 6.4.2.5 to TS 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#47 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

revised [WTS] [JSN]
R5-187591 Discussion on Measurement Uncertainty in FR2 discussion

revised to R5-188061

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187592 Addition of EVM equalizer spectral flatness test case 6.4.2.5 to TS 38.521-1 CR ROHDE & SCHWARZ 38.521-1 15.0.0 CR#165 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

revised [WTS] [JSN]
R5-187593 Discussion on test point selection for EVM equalizer spectrum flatness for Pi/2 BPSK in FR1 CR ROHDE & SCHWARZ 38.905 15.0.0 CR#48 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187594 Update of Common Uplink Configuration for FR2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#48 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

revised [WTS] [JSN]
R5-187595 Update of MU budget and contributor description to TR 38.903 CR ROHDE & SCHWARZ 38.903 15.0.0 CR#19 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

revised [WTS] [JSN]
R5-187596 Discussion on Applicability and Test selection criteria for RRM CA test cases discussion

revised to R5-187852

Qualcomm Japan Inc LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.11

revised [WTS] [JSN]
R5-187597 Addition of Test Case selection criteria for RRM CA CR Qualcomm Japan Inc 36.521-3 15.3.0 CR#2349 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-187598 Update on Applicability and Procedure for generic duplex mode RRM test case 8.16.86 CR Qualcomm Japan Inc 36.521-3 15.3.0 CR#2350 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

revised [WTS] [JSN]
R5-187599 Udpates to sections 1-4 in TS 38.521-3 to align with core spec CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#90 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

revised [WTS] [JSN]
R5-187600 section 4 of 38.521-4 spec pCR

revised to R5-187845

Qualcomm Finland RFFE Oy 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

revised [WTS] [JSN]
R5-187601 Discussion summarizing several guidelines for TC definitions in TS38.521-3 discussion

revised to R5-187815

Qualcomm Japan Inc 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187602 pCR-FDD-PDSCH-FR1-Test 5.2.2.1 pCR

revised to R5-187846

Qualcomm CDMA Technologies 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

revised [WTS] [JSN]
R5-187603 discussion on demod spec structure discussion

revised to R5-188007

Qualcomm Finland RFFE Oy 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-187604 Updates to Clause 5 in TS 38.521-3 CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#91 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

revised [WTS] [JSN]
R5-187605 Update of FR2 MU values CR Anritsu 38.521-2 15.0.0 CR#49 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

withdrawn [WTS] [JSN]
R5-187606 new TC for PDSCH FR1 FDD demod pCR Qualcomm Finland RFFE Oy 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

withdrawn [WTS] [JSN]
R5-187607 Updates to clause 7.3B.3.4 in TS 38.521-3 CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#92 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

revised [WTS] [JSN]
R5-187608 pCR for PDCCH Demod in FR1 5.3.2.2 pCR

revised to R5-187844

Qualcomm CDMA Technologies 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

revised [WTS] [JSN]
R5-187609 draft TS 38.521-4 v0.2.0 draft TS Qualcomm Finland RFFE Oy 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 7.5

approved [WTS] [JSN]
R5-187610 Corrections to IEs part of PDSCH-ServingCellConfig, ServingCellConfig and ServingCellConfigCommon CR Qualcomm Korea 38.508-1 15.1.0 CR#398 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187611 Correcton to MAC TBS test cases CR Motorola Mobility, MCC TF160 38.523-1 15.1.0 CR#294 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-187612 Addition of the message content of PDCP-config for UDC CR CATT 36.508 15.3.0 CR#1225 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.1

agreed [WTS] [JSN]
R5-187613 LTE Anchor Link configuration for FR2 CR Anritsu 38.521-3 15.0.0 CR#93 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

revised [WTS] [JSN]
R5-187614 Updates to EN-DC test case 6.2B.2.2, UE Maximum Output Power reduction for Intra-Band Non-Contiguous EN-DC CR Ericsson 38.521-3 15.0.0 CR#94 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187615 Introduction of TC 6.5D.3.1 General spurious emissions for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#167 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187616 Introduction of TC 6.5D.3.2 Spurious Emission for UE co-existence for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#168 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187617 Introduction of TC 6.5D.3.3 Additional Spurious Emission for UL MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#169 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187618 Updation of Uplink channel for SUL in Annex G CR Huawei, Hisilicon 38.521-1 15.0.0 CR#170 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187619 Update of Section 6.3.3.1 General CR SGS wireless 38.521-2 15.0.0 CR#50 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187620 LS on Study on evaluation for 2 RX exception in Rel-15 vehicle mounted UE for NR LS in

source LS: A-180331

5GAA Working Group meeting R5-81

AI: 7.2.3

noted [WTS] [JSN]
R5-187621 RAN5#80 WG Minutes report

revision of R5-186405

ETSI Secretariat R5-81

AI: 2.1

approved [WTS] [JSN]
R5-187622 MCC TF160 Status Report report

revision of R5-186715

MCC TF160 R5-81

AI: 7.2.3

noted [WTS] [JSN]
R5-187623 Discussion on LS on FGI bit 103 and 104 discussion

revision of R5-187375

Huawei, HiSilicon, CMCC, CATT R5-81

AI: 4.5.3

noted [WTS] [JSN]
R5-187624 Proposed Word Template for RAN5 WI Work Plan other

revision of R5-187103

BlackBerry UK Limited R5-81

AI: 4.3

approved [WTS] [JSN]
R5-187625 Uncover the Veil of 5G S-Module discussion CMCC, Sprint R5-81

AI: 4.5.3

noted [WTS] [JSN]
R5-187626 Response LS to RAN4 on method to distinguish vehicle UE from handheld UE LS in

source LS: CAG-18-481r1

GCF CAG R5-81

AI: 5.2

noted [WTS] [JSN]
R5-187627 New WID on UE Conformance Test Aspects - Bluetooth/WLAN measurement collection in LTE Minimization of Drive Tests (MDT) WID new

revision of R5-186657

CMCC Rel-15 R5-81

AI: 7.4.1

noted [WTS] [JSN]
R5-187628 New Work Item Proposal: UE Conformance Test Aspects – Enhanced LTE Support for Aerial Vehicles WID new

revision of R5-186793

NTT DOCOMO INC. Rel-15 R5-81

AI: 7.4.1

noted [WTS] [JSN]
R5-187629 New WID proposal: UE Conformance Test Aspects – Enhancing LTE CA Utilization WID new

revision of R5-186997

Nokia, Nokia Shanghai Bell Rel-15 R5-81

AI: 7.4.1

noted [WTS] [JSN]
R5-187630 New WID: Conformance test for Shortened TTI and processing time for LTE WID new

revision of R5-187467

Huawei, Hisilicon R5-81

AI: 7.4.1

noted [WTS] [JSN]
R5-187631 Calculation of test frequencies for FDD NR bands with asymmetric channel bandwidths discussion Ericsson, Dish Network R5-81

AI: 4.5.6

noted [WTS] [JSN]
R5-187632 UE Capability in EN-DC discussion

revision of R5-187258

Qualcomm Europe Inc.(Spain) 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 7.2.3

noted [WTS] [JSN]
R5-187633 Meeting schedule for 2019-20 other

revision of R5-186416

WG Chairman R5-81

AI: 7.6

noted [WTS] [JSN]
R5-187634 Correction to test case 7.1.2.12 CR MediaTek Inc. 36.523-1 15.3.0 CR#47011 catF TEI14_Test, LTE_SRS_switch-UEConTest Rel-15 R5-81

AI: 6.4.3.2.1

agreed [WTS] [JSN]
R5-187635 Update eLAA test case 7.1.4.31 CR Qualcomm Incorporated 36.523-1 15.3.0 CR#47061 catF TEI14_Test, LTE_eLAA-UEConTest Rel-15 R5-81

AI: 6.4.3.2.1

agreed [WTS] [JSN]
R5-187636 Correction to test cases 8.3.1.10, 8.3.1.11a, 8.3.1.15 and 8.3.1.16 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#46851 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.3

agreed [WTS] [JSN]
R5-187637 Correction to test case 8.3.1.9 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#46871 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.3

agreed [WTS] [JSN]
R5-187638 Update of test case 6.2.1.4 applicability CR Qualcomm Incorporated 36.523-2 15.3.0 CR#12411 catF TEI8_Test Rel-15 R5-81

AI: 6.4.4

agreed [WTS] [JSN]
R5-187639 Update NB-IoT Rel-14 DCI format N0/N1 with HARQ process number CR TDIA, MCC TF160, CATT 36.508 15.3.0 CR#12131 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.1

agreed [WTS] [JSN]
R5-187640 Clarification to inband testing for signalling test cases CR ROHDE & SCHWARZ, MCC TF160 36.508 15.3.0 CR#1226 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 6.4.1

agreed [WTS] [JSN]
R5-187641 Addition of specific RDS message contents for NB-IoT test case 22.5.19 CR TDIA, CATT 36.523-1 15.3.0 CR#46741 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

agreed [WTS] [JSN]
R5-187642 Correction to NB-IoT test case 22.3.2.6 CR TDIA, CATT 36.523-1 15.3.0 CR#46781 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

agreed [WTS] [JSN]
R5-187643 New feMTC IEs CR Ericsson 36.508 15.3.0 CR#12191 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 6.3.12.1

agreed [WTS] [JSN]
R5-187644 New feMTC test case 21.2.2 CR Ericsson 36.523-1 15.3.0 CR#46911 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 6.3.12.2

agreed [WTS] [JSN]
R5-187645 Updates to feMTC test case applicabilities CR Ericsson 36.523-2 15.3.0 CR#12351 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-187646 Addition of support for LWA/LWIP Test Cases in generic procedures CR Intel Corporation (UK) Ltd 36.508 15.3.0 CR#12201 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.1

agreed [WTS] [JSN]
R5-187647 Correction of LWA Test Case 8.2.5.8 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#46941 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

agreed [WTS] [JSN]
R5-187648 Corrections to LWA TC 8.2.5.7 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#46951 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

agreed [WTS] [JSN]
R5-187649 Correction of LWA Test Case 8.2.5.4 and LWIP 8.2.5.5 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#46971 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

agreed [WTS] [JSN]
R5-187650 Corrections to LWA/LWIP Test Cases 8.2.5.1, 8.2.5.2, 8.2.5.6 CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#46981 catF LTE_WLAN_radio-UEConTest Rel-15 R5-81

AI: 6.3.3.2

agreed [WTS] [JSN]
R5-187652 Updates to test loop modes for NB-IoT enhancement CR MCC TF160, TDIA 36.509 14.5.0 CR#201 catF NB_IOTenh-UEConTest Rel-14 R5-81

AI: 6.3.11.2

agreed [WTS] [JSN]
R5-187653 Updates to test loop modes for NB-IoT enhancement CR MCC TF160, TDIA 36.509 15.1.0 CR#202 catA NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.2

agreed [WTS] [JSN]
R5-187654 Correction to eNB-IoT test case 22.3.2.7 CR MCC TF160, TDIA 36.523-1 15.3.0 CR#4708 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

agreed [WTS] [JSN]
R5-187655 Correction to V2X test case 24.1.13 CR MCC TF160, Sporton, CATT 36.523-1 15.3.0 CR#4709 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.3

revised [WTS] [JSN]
R5-187656 Updates to V2X test case 24.3.3 CR MCC TF160 36.523-1 15.3.0 CR#4710 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.3

agreed [WTS] [JSN]
R5-187657 Reply LS on TM9 FGI bits 103 and 104 LS out

LS is reply to R5-186424

LS To: TSG RAN

TSG WG RAN5 R5-81

AI: 7.5

approved [WTS] [JSN]
R5-187658 Handling of SoR TC Between CT6 and RAN5 discussion Qualcomm Incorporated R5-81

AI: 6.3.9.19

noted [WTS] [JSN]
R5-187659 Wordings for Uplink NAS messages CR ROHDE & SCHWARZ, MCC TF160 38.508-1 15.1.0 CR#2431 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187660 Default cell configurations for NAS CR ROHDE & SCHWARZ, HiSilicon 38.508-1 15.1.0 CR#2471 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187661 Update IE SI-SchedulingInfo CR Ericsson, Huawei, HiSilicon 38.508-1 15.1.0 CR#2481 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187662 Addition of Combinations of system information blocks in 4.4.3.1.2 CR Huawei, HiSilicon 38.508-1 15.1.0 CR#3491 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187663 Update chapter 4.5.2 RRC_IDLE CR

revision of R5-186668

Ericsson 38.508-1 15.1.0 CR#2601 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187664 Correction to various Radio resource control IEs CR ANRITSU LTD 38.508-1 15.1.0 CR#2631 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187665 Correction to DCI formats 0_0 and 0_1 CR Ericsson, MCC TF160, Huawei, HiSilicon, Keysight Technologies 38.508-1 15.1.0 CR#3081 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-187666 Introduction of SDL and SUL cells in simulated cells in clause 4.4.2 CR Ericsson 38.508-1 15.1.0 CR#3101 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187667 Correction to RRC_IDLE procedure CR Ericsson 38.508-1 15.1.0 CR#3141 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187668 Update CSI related information elements CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#3321 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187669 Update ServingCellConfigCommon and TDD-UL-DL-Config CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#3331 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187670 Update SRS-Config CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#3341 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187671 Update some information elements for measurements CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#3361 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187672 Update CellGroupConfig and related information elements CR NTT DOCOMO INC., Huawei, Anritsu Ltd. 38.508-1 15.1.0 CR#3371 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187673 CR of NR 508-1 clause 4.6.2_SIB2, SIB4 CR Huawei, Hisilicon, Ericssion, TF160 38.508-1 15.1.0 CR#3381 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187674 CR of NR 508-1 Table 4.4.2-2_Default NR Cells parameters CR Huawei, Hisilicon, Ericsson, TF160 38.508-1 15.1.0 CR#3391 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187675 Update RLC-Config CR NTT DOCOMO INC. 38.508-1 15.1.0 CR#3411 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187676 Specifying Test procedure to check that UE is camped on a new NR cell belonging to a new TA CR Samsung 38.508-1 15.1.0 CR#3571 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187677 Updates to Authentication 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#3601 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187678 Updates to PDU session release 5GSM messages CR Ericsson 38.508-1 15.1.0 CR#3691 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187679 Updates to Security mode 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#3711 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187680 Addition of new Information Elements in section 4.6.3 CR Ericsson 38.508-1 15.1.0 CR#3751 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187681 Updates to SIG OTA Calibration for FR2 CR Qualcomm Europe Inc.(Spain) 38.508-1 15.1.0 CR#3791 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187682 Addition of default QoS configurations CR Ericsson 38.508-1 15.1.0 CR#3941 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187683 Corrections to C.32 and C.32a CR ROHDE & SCHWARZ, Qualcomm Incorporated 34.229-1 14.4.0 CR#12971 catF TEI9_Test Rel-14 R5-81

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-187684 Addition of Test Loop for SDAP testing CR Ericsson, Motorola Mobility, Samsung 38.509 15.1.0 CR#81 catB 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.3

agreed [WTS] [JSN]
R5-187685 LS on the testability of FR2 transmitter and reception tests LS out

LS To: GCF CAG, PTCRB PVG

TSG WG RAN5 R5-81

AI: 7.5

approved [WTS] [JSN]
R5-187686 Adding test case 6.1.1.7 CR MediaTek Inc. 38.523-1 15.1.0 CR#2831 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

agreed [WTS] [JSN]
R5-187687 Split of 5G Steering of Roaming test coverage between RAN5 and CT6 LS out

LS To: TSG WG CT6

TSG WG RAN5 R5-81

AI: 6.6

approved [WTS] [JSN]
R5-187688 Addition of NR test case 7.1.1.1.3_SI Request CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2021 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-187689 Addition of NR test case 7.1.1.1.6_Random access CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2031 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-187690 Addition of NR test case 7.1.1.2.3_CCCH HARQ CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2041 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-187691 CR of NR test case 7.1.2.3.9_RLC Reassembling CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2131 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.3

agreed [WTS] [JSN]
R5-187692 Correction to PDCP Test case 7.1.3.5.4 PDCP reordering / Maximum re-ordering delay below t-Reordering / t-Reordering timer operations CR Qualcomm Europe Inc.(Spain) 38.523-1 15.1.0 CR#2521 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.4

agreed [WTS] [JSN]
R5-187693 Correcton to SDAP test cases CR Motorola Mobility 38.523-1 15.1.0 CR#2341 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.5

agreed [WTS] [JSN]
R5-187694 Updating UE registration procedure to handle UE capability in 2 steps CR Qualcomm 36.508 15.3.0 CR#1227 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

revised [WTS] [JSN]
R5-187695 Addition of 5GS SA RRC TC 8.1.1.1.1 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#2431 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

agreed [WTS] [JSN]
R5-187696 Addition of 5GS SA RRC TC 8.1.5.2.1 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#2461 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

agreed [WTS] [JSN]
R5-187697 Update RRC TC 8.2.1.1.1 - UE capability transfer / Success / EN-DC CR

revision of R5-187243

Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#2421 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.1

withdrawn [WTS] [JSN]
R5-187698 Correction to NR RRC test case 8.2.3.5.1 CR ANRITSU LTD 38.523-1 15.1.0 CR#1591 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-187699 Correction to NR RRC test case 8.2.3.9.1 and 8.2.3.10.1 CR ANRITSU LTD 38.523-1 15.1.0 CR#1601 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-187700 Update RRC TC 8.2.3.1.1 - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#2391 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-187701 Update RRC TC 8.2.3.12.1 CR Intertek 38.523-1 15.1.0 CR#2721 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-187702 Update of 5GS NR RRC test case 8.2.3.6.1 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#2761 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-187703 Update of 5GS NR RRC test case 8.2.3.8.1 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#2771 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-187704 Update to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC CR Qualcomm Incorporated 38.523-1 15.1.0 CR#2881 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-187705 Update to 5G-NR RRC measurement report TCs for FR1/FR2 cell power level CR Qualcomm Incorporated, Tech Mahindra, Intertek, Anritsu, Rohde & Schwarz 38.523-1 15.1.0 CR#2891 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-187706 Updates to EN-DC TC 8.2.5.3.1 CR MCC TF160, Qualcomm 38.523-1 15.1.0 CR#1681 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.5

agreed [WTS] [JSN]
R5-187707 Corrections to NAS test case 9.1.5.1.14 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#1401 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

agreed [WTS] [JSN]
R5-187708 New NAS test case 9.1.3.1 CR

revision of R5-186572

ROHDE & SCHWARZ 38.523-1 15.1.0 CR#1411 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-187709 Corrections to clause 5.5.9 of 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#141 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-187710 Corrections to clause 5.5.7.1 of 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#151 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-187711 Update for Resource-lists in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#161 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-187712 Correction to Table 5.5.1-1 in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#171 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-187713 Correction to Table 5.5.4.10.1-1 in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#181 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-187714 Correction to Table 5.5.4.2-1 in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#191 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-187715 Correction to SIP NOTIFY message in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#201 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-187716 Correction to SIP SUBSCRIBE message in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#211 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-187717 Update of Generic Test 5.3.2 in 36.579-1 CR NIST, Samsung 36.579-1 14.0.0 CR#221 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-187718 Update of TC 5.1 in 36.579-2 CR NIST, Samsung 36.579-2 14.0.0 CR#211 catF TEI13_Test, MCPTT-ConTest Rel-14 R5-81

AI: 6.5.9.2

agreed [WTS] [JSN]
R5-187719 Correction to Table 6.6.2-1 in 36.508 CR NIST, Samsung 36.508 15.3.0 CR#12241 catF TEI13_Test, MCPTT-ConTest Rel-15 R5-81

AI: 6.5.9.6

agreed [WTS] [JSN]
R5-187720 Uplink PTRS disable for RF testing CR Keysight Technologies UK Ltd 38.508-1 15.1.0 CR#3192 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.1

agreed [WTS] [JSN]
R5-187721 Handling of power on / power off cycles and UE Automation in RRM and SIG testing for FR2 discussion

revision of R5-186698

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 4.5.3

noted [WTS] [JSN]
R5-187722 Addition to E-UTRA test frequencies for intra-band contiguous configuration for band 41 CR

revision of R5-186469

Ericsson 38.508-1 15.1.0 CR#2421 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 7.2.3

revised [WTS] [JSN]
R5-187723 Correction of test frequencies for NR band n257 CR Ericsson 38.508-1 15.1.0 CR#3031 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-187724 New annex for NR test frequency calculations CR MCC TF160, Ericsson 38.508-1 15.1.0 CR#2691 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-187725 Correction of test frequencies for NR band n71 CR Ericsson 38.508-1 15.1.0 CR#2971 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-187726 Positioning NSA Protocol tests - LPP Procedures CR ROHDE & SCHWARZ 37.571-2 15.3.0 CR#1121 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.15

agreed [WTS] [JSN]
R5-187727 Applicability for NR NSA Option 3 protocol tests CR

revision of R5-187392

ROHDE & SCHWARZ 37.571-3 15.3.0 CR#1051 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.16

revised [WTS] [JSN]
R5-187728 5GC testcase optimisation discussion CATT R5-81

AI: 6.3.9.19

noted [WTS] [JSN]
R5-187729 Addition of ReportConfigInterRAT for NR CR Intertek 36.508 15.3.0 CR#12211 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187730 Updating UE registration procedure to handle UE capability in 2 steps CR Qualcomm 36.508 15.3.0 CR#12271 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187731 Removal of Testcase 7.1.4.36 CR CATT 36.523-1 15.3.0 CR#4711 catF LTE_VoLTE_ViLTE_enh-UEConTest Rel-15 R5-81

AI: 6.3.10.5

agreed [WTS] [JSN]
R5-187732 Removal of the test applicability for testcase 7.1.4.36 CR

revised to R5-187776

CATT 36.523-2 15.3.0 CR#1243 catF LTE_VoLTE_ViLTE_enh-UEConTest Rel-15 R5-81

AI: 6.3.10.6

revised [WTS] [JSN]
R5-187733 Correction on V2X testcase 24.3.2 CR CATT, TF160 36.523-1 15.3.0 CR#46531 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.3

agreed [WTS] [JSN]
R5-187734 Correction to V2X test case 24.1.13 CR MCC TF160, Sporton, CATT 36.523-1 15.3.0 CR#47091 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 6.3.8.3

agreed [WTS] [JSN]
R5-187735 Addition of new LTE_UDC-UEConTest test case 7.3.10.1 CR CATT 36.523-1 15.3.0 CR#46581 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.2

agreed [WTS] [JSN]
R5-187736 Addition of new LTE_UDC-UEConTest test case 7.3.10.2 CR CATT 36.523-1 15.3.0 CR#46591 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.2

agreed [WTS] [JSN]
R5-187737 Addition of new LTE_UDC-UEConTest test case 7.3.10.3 CR CATT 36.523-1 15.3.0 CR#46601 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.2

agreed [WTS] [JSN]
R5-187738 Addition of new LTE_UDC-UEConTest test case 8.5.1.9 CR CATT 36.523-1 15.3.0 CR#46621 catF LTE_UDC-UEConTest Rel-15 R5-81

AI: 6.3.20.2

agreed [WTS] [JSN]
R5-187739 Addition of SRB4 configuration to RRC connection CR Huawei, HiSilicon 36.508 15.3.0 CR#12101 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.1

agreed [WTS] [JSN]
R5-187740 Addition of Condition QMC for LTE QMC test CR Huawei, HiSilicon 36.508 15.3.0 CR#12111 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.1

agreed [WTS] [JSN]
R5-187741 Introduction of RRC TC QoE Measurement Collection in 8.3.5.1 CR Huawei, HiSilicon 36.523-1 15.3.0 CR#46541 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.2

agreed [WTS] [JSN]
R5-187742 Introduction of RRC TC Qoemtsi Measurement Collection in 8.3.5.2 CR Huawei, HiSilicon 36.523-1 15.3.0 CR#46551 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.2

agreed [WTS] [JSN]
R5-187743 Addition of applicability statements for LTE QMC test cases CR China Unicom 36.523-2 15.3.0 CR#12301 catF LTE_QMC_Streaming-UEConTest Rel-15 R5-81

AI: 6.3.17.3

agreed [WTS] [JSN]
R5-187744 Addition of NR test case 9.1.5.1.1_Registration Request CR

revision of R5-186978

Huawei, Hisilicon, CAICT, CATT, Samsung, TF160, R&S, Motorola, Ericsson, Qualcomm 38.523-1 15.1.0 CR#2221 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187745 Update SIB1 CR Ericsson, Huawei, HiSilicon 38.508-1 15.1.0 CR#2381 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187746 Revised WID on UE Conformance Test Aspects- Voice and Video Enhancement for LTE WID revised CATT LTE_VoLTE_ViLTE_enh-UEConTest Rel-14 R5-81

AI: 7.4.2

endorsed [WTS] [JSN]
R5-187747 Correction to Signal levels for conducted testing CR ANRITSU LTD 38.508-1 15.1.0 CR#2571 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187748 Updates to E-UTRA RRC_CONNECTED generic procedure CR MCC TF160, Ericsson, Qualcomm 38.508-1 15.1.0 CR#2701 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187749 Correcton to Layer 2 Pre Test conditions CR

revised to R5-187783

Motorola Mobility 38.523-1 15.1.0 CR#295 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-187750 Add RRCResumeComplete CR Ericsson 38.508-1 15.1.0 CR#2751 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187751 Update chapter 4.5.3 RRC_INACTIVE CR Ericsson 38.508-1 15.1.0 CR#2781 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187752 Correction of test frequencies for signalling testing in clause 6 CR Ericsson 38.508-1 15.1.0 CR#3071 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 4.5.6

agreed [WTS] [JSN]
R5-187753 Specifying Test procedure to check that UE is in RRC_IDLE state on a certain NR cell CR Samsung 38.508-1 15.1.0 CR#3171 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187754 Update IE RLF-TimersAndConstants CR Ericsson 38.508-1 15.1.0 CR#3291 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187755 Add RRCSetup CR Ericsson 38.508-1 15.1.0 CR#3461 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187756 Update RRCReconfiguration CR Ericsson 38.508-1 15.1.0 CR#3471 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187757 Update IE RadioBearerConfig CR Ericsson 38.508-1 15.1.0 CR#3561 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187758 Updates to PDU session establishment 5GSM messages CR

revision of R5-187165

Ericsson 38.508-1 15.1.0 CR#3671 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

revised [WTS] [JSN]
R5-187759 Updates to Registration 5GMM messages CR Ericsson, Rohde & Schwarz 38.508-1 15.1.0 CR#3701 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187760 Updates to Security protected 5GS NAS and 5GMM status messages CR Ericsson 38.508-1 15.1.0 CR#3721 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187761 Updates to Service Request 5GMM messages CR Ericsson 38.508-1 15.1.0 CR#3731 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187762 Addition and updates to Information Elements in section 4.6.4 CR Ericsson 38.508-1 15.1.0 CR#3761 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187763 Addition of 5GS related new EFs to Test UICC definition CR ROHDE & SCHWARZ 38.508-1 15.1.0 CR#3881 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187764 Update IE CellGroupConfig CR Ericsson 38.508-1 15.1.0 CR#3951 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-187765 New Test Case in section 10.2 of TS 36.523-1 CR NIST, FirstNet 36.523-1 15.3.0 CR#47021 catF TEI14_Test Rel-15 R5-81

AI: 6.4.3.5

agreed [WTS] [JSN]
R5-187766 Update of applicability for QCI 66 in 36.523-2 CR NIST, FirstNet 36.523-2 15.3.0 CR#12381 catF TEI14_Test Rel-15 R5-81

AI: 6.4.4

agreed [WTS] [JSN]
R5-187767 LS concerning RAN5 Response to ITU-R Working Party 5D Reply Liaison Statement to 3GPP RAN4/RAN5 on definition of test methods for OTA unwanted emissions of IMT radio equipment LS out

LS To: TSG RAN

TSG WG RAN5 R5-81

AI: 7.5

postponed [WTS] [JSN]
R5-187768 Update of Test case 8.5.4.1 with UE DL and UL Cat 22,23,24,25,26 capability check CR Intel Corporation (UK) Ltd 36.523-1 15.3.0 CR#46721 catF TEI15_Test Rel-15 R5-81

AI: 6.4.3.3.1

agreed [WTS] [JSN]
R5-187769 Correction to test case 8.2.4.7 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#46831 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.2

agreed [WTS] [JSN]
R5-187770 Correction to test case 8.2.4.8 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.3.0 CR#46841 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3.3.2

agreed [WTS] [JSN]
R5-187771 Correction to 8.3.1.x measurement TCs with Cat-M1 device. CR ANRITSU LTD 36.523-1 15.3.0 CR#47051 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-81

AI: 6.4.3

agreed [WTS] [JSN]
R5-187772 Correction to SRVCC test cases for IMS Reregistration over UTRAN CR Keysight Technologies UK Ltd 36.523-1 15.3.0 CR#46731 catF TEI8_Test Rel-15 R5-81

AI: 6.4.3.8

agreed [WTS] [JSN]
R5-187773 Correction to NB-IoT test case 22.4.22 CR ROHDE & SCHWARZ 36.523-1 15.3.0 CR#46651 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-187774 Addition of DL and UL Category 22,23,24,25,26 to Table A.4.3.2-2 and A.4.3.2-3 CR Intel Corporation (UK) Ltd 36.523-2 15.3.0 CR#12331 catF TEI15_Test Rel-15 R5-81

AI: 6.4.4

agreed [WTS] [JSN]
R5-187775 Discussion paper on Session Timer coverage discussion

revision of R5-186451

ROHDE & SCHWARZ, Intel R5-81

AI: 6.5.6.5

noted [WTS] [JSN]
R5-187776 Removal of the test applicability for testcase 7.1.4.36 CR

revision of R5-187732

CATT 36.523-2 15.3.0 CR#12431 catF LTE_VoLTE_ViLTE_enh-UEConTest Rel-15 R5-81

AI: 6.3.10.6

revised [WTS] [JSN]
R5-187777 Addition of PICS CR Motorola Mobility, CMCC 38.508-2 15.1.0 CR#111 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.2

agreed [WTS] [JSN]
R5-187778 Adding test case 6.1.1.8 CR MediaTek Inc. 38.523-1 15.1.0 CR#2841 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

agreed [WTS] [JSN]
R5-187779 Addition of NR test case 7.1.1.1.4_Beam Failure CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2261 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-187780 Addition of NR test case 7.1.1.1.5 SUL CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2271 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.

agreed [WTS] [JSN]
R5-187781 Correction to NR MAC test case 7.1.1.3.2 CR Keysight Technologies UK Ltd 38.523-1 15.1.0 CR#2811 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-187782 Addition of 5GS NR MAC test case 7.1.1.8.1 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#2911 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-187783 Correcton to Layer 2 Pre Test conditions CR

revision of R5-187749

Motorola Mobility 38.523-1 15.1.0 CR#2951 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-187784 Correction to the default Pre-Test Conditions for AM and UM RLC test cases CR Keysight Technologies UK Ltd 38.523-1 15.1.0 CR#1841 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.3

agreed [WTS] [JSN]
R5-187785 Correction to PDCP Ciphering test cases CR Motorola Mobility, MCC TF160 38.523-1 15.1.0 CR#2321 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.4

agreed [WTS] [JSN]
R5-187786 Correcton to PDCP Integrity test cases CR Motorola Mobility and MCC TF160 38.523-1 15.1.0 CR#2331 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.4

agreed [WTS] [JSN]
R5-187787 Addition of NR test case 8.1.1.2.3_T300 expiry CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2161 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

agreed [WTS] [JSN]
R5-187788 Addition of NR test case 8.1.1.3.1_Redirection to NR CR

revision of R5-186973

Huawei, Hisilicon 38.523-1 15.1.0 CR#2171 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-187789 Addition of 5GS SA RRC TC 8.1.1.2.5 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#2451 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

agreed [WTS] [JSN]
R5-187790 Addition of 5GS NR RRC test case 8.1.1.3.2 CR ROHDE & SCHWARZ 38.523-1 15.1.0 CR#2751 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

agreed [WTS] [JSN]
R5-187791 Update of 5GS NR RRC test case 8.2.1.1.1 CR

revision of R5-187509

ROHDE & SCHWARZ, Qualcomm 38.523-1 15.1.0 CR#2801 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.1

revised [WTS] [JSN]
R5-187792 Addition of NR test case 8.2.3.11.1_gapFR1 CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2241 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-187793 Addition of NR test case 8.2.3.11.2_gapFR2 CR

revision of R5-186992

Huawei, Hisilicon 38.523-1 15.1.0 CR#2251 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

revised [WTS] [JSN]
R5-187794 Addition of NR test case 8.1.5.3.1_PWS notification CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2211 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

agreed [WTS] [JSN]
R5-187795 Update RRC SCG failure TC 8.2.5.1.1 CR Qualcomm Korea (TTA) 38.523-1 15.1.0 CR#2401 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.5

agreed [WTS] [JSN]
R5-187796 Update to 5G TC TA registration update CR

revision of R5-186874

Samsung 38.523-1 15.1.0 CR#1831 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

revised [WTS] [JSN]
R5-187797 Addition of new 5GC TC 9.1.6.1.1 CR CATT, TDIA 38.523-1 15.1.0 CR#2631 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

agreed [WTS] [JSN]
R5-187798 Addition of 5GC test case 10.1.3.1 CR

revision of R5-187357

revised to R5-188191

CATT, TDIA, CAICT 38.523-1 15.1.0 CR#2701 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-187799 Adding applicability for 5G TC TA registration update CR Samsung 38.523-2 15.1.0 CR#221 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

agreed [WTS] [JSN]
R5-187800 Response LS to RAN4 on method to distinguish vehicle UE from handheld UE LS out

LS is reply to R4-1814321

LS To: TSG WG RAN4

TSG WG RAN5 R5-81

AI: 7.5

approved [WTS] [JSN]
R5-187801 Uplink PTRS disable for RF testing CR

revision of R5-186905

Keysight Technologies UK Ltd 38.508-1 15.1.0 CR#3191 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

revised [WTS] [JSN]
R5-187802 Updating power levels for LTE Anchor Link CR Anritsu 38.508-1 15.1.0 CR#3841 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

agreed [WTS] [JSN]
R5-187803 FR2 UE RSRPB Function 38.509 CR Qualcomm CDMA Technologies 38.509 15.1.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.3

revised [WTS] [JSN]
R5-187804 Editorial_Cleaning up for description of test requirement in clause 6 CR NTT DOCOMO, INC. 38.521-1 15.0.0 CR#691 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187805 Introduction of TC 7.7D Spurious response for UL-MIMO CR CMCC, Huawei 38.521-1 15.0.0 CR#631 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

agreed [WTS] [JSN]
R5-187806 Test Point analysis for FR1 7.4 Maximum input level CR CAICT, Huawei 38.905 15.0.0 CR#231 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-187807 Introduction of receiver spurious emission tests for FR1 SA CR Anritsu 38.521-1 15.0.0 CR#1131 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

agreed [WTS] [JSN]
R5-187808 TP analysis for receiver spurious emission tests for FR1 SA CR Anritsu 38.905 15.0.0 CR#351 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-187809 TP analysis for wideband intermodulation tests for FR1 SA CR Anritsu 38.905 15.0.0 CR#361 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-187810 Introduction of wideband intermodulation tests for FR1 SA CR Anritsu 38.521-1 15.0.0 CR#1141 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

agreed [WTS] [JSN]
R5-187811 Introduction of TC 7.3D Reference sensitivity for UL-MIMO CR Huawei, Hisilicon 38.521-1 15.0.0 CR#1451 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

agreed [WTS] [JSN]
R5-187812 Update of operating bands and channel arrangement to TS 38.521-1 CR China Unicom 38.521-1 15.0.0 CR#851 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

agreed [WTS] [JSN]
R5-187813 NR FR1 TT Way Forward update discussion

revision of R5-186887

Telecom Italia, Orange, AT&T, CMCC 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187814 Discussion of MU for occupied BW for FR1 discussion

revision of R5-187275

Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

approved [WTS] [JSN]
R5-187815 Discussion summarizing several guidelines for TC definitions in TS38.521-3 discussion

revision of R5-187601

Qualcomm Japan Inc 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187816 Adding test case 6.2B.2.4, UE Maximum Output Power reduction for Inter-Band EN-DC including FR2 CR Ericsson 38.521-3 15.0.0 CR#481 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187817 TP analysis for receiver spurious emission tests for FR1 inter-band EN-DC CR Anritsu 38.905 15.0.0 CR#331 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-187818 TP analysis for wideband intermodulation tests for FR1 inter-band EN-DC CR Anritsu 38.905 15.0.0 CR#341 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-187819 Update general parameter Connection without release in initial conditions in TS 38.521-3 CR Keysight Technologies UK Ltd 38.521-3 15.0.0 CR#531 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187820 Updates to test case 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC CR Ericsson 38.521-3 15.0.0 CR#431 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187821 Addition OBW intraband non contiguous EN-DC CR Keysight Technologies UK Ltd 38.521-3 15.0.0 CR#521 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187822 Introduction of New test case 6.4B.2.2.1 Error Vector Magnitude for intra-band non-contiguous EN-DC CR KTL 38.521-3 15.0.0 CR#551 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187823 Introduction of New test case 6.4B.2.2.2 Carrier Leakage for intra-band non-contiguous EN-DC CR KTL 38.521-3 15.0.0 CR#561 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187824 pCR for new TC addition for FR1 FDD PDSCH Demod pCR

revised to R5-188009

Qualcomm CDMA Technologies 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

revised [WTS] [JSN]
R5-187825 Introduction of New test case 6.4B.2.3.1 Error Vector Magnitude for inter-band EN-DC within FR1 CR KTL 38.521-3 15.0.0 CR#581 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187826 Introduction of New test case 6.4B.2.3.2 Carrier Leakage for inter-band EN-DC within FR1 CR KTL, MTCC 38.521-3 15.0.0 CR#591 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187827 Introduction of New test case 6.4B.2.3.3 In-band Emissions for inter-band EN-DC within FR1 CR KTL, MTCC 38.521-3 15.0.0 CR#601 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187828 Introduction of Error Vector Magnitude for intra-band contiguous EN-DC CR LG Electronics 38.521-3 15.0.0 CR#701 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187829 Introduction of Carrier Leakage for intra-band contiguous EN-DC CR LG Electronics 38.521-3 15.0.0 CR#711 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187830 pCR for new TC addition for FR1 FDD PDCCH Demod pCR

revised to R5-188010

Qualcomm CDMA Technologies 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

revised [WTS] [JSN]
R5-187831 FR2 General Spurious Emission test case update CR Qualcomm Austria RFFE GmbH 38.521-3 15.0.0 CR#881 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-187832 FR2 Reference Sensitivity test case update CR Qualcomm Austria RFFE GmbH 38.521-3 15.0.0 CR#891 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

agreed [WTS] [JSN]
R5-187833 Updates to clause 7.3B.3.4 in TS 38.521-3 CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#921 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

agreed [WTS] [JSN]
R5-187834 Udpates to sections 1-4 in TS 38.521-3 to align with core spec CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#901 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-187835 Updates to Clause 5 in TS 38.521-3 CR Qualcomm Japan Inc 38.521-3 15.0.0 CR#911 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-187836 Test Point analysis for FR2 7.4 Maximum input level CR CAICT, Huawei 38.905 15.0.0 CR#251 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-187837 Updates to maximum output power test cases CR

revision of R5-187481

Ericsson 38.521-2 15.0.0 CR#401 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

revised [WTS] [JSN]
R5-187838 Update of transmit signal quality test cases in 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#451 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

agreed [WTS] [JSN]
R5-187839 Addition of In-band Emissions test case to TS 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#461 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

agreed [WTS] [JSN]
R5-187840 Addition of EVM equalizer spectral flatness test cases 6.4.2.4 and 6.4.2.5 to TS 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#471 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

agreed [WTS] [JSN]
R5-187841 Update of Common Uplink Configuration for FR2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#481 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

agreed [WTS] [JSN]
R5-187842 General sections updated to 38.521-2 CR CAICT, Huawei 38.521-2 15.0.0 CR#291 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187843 Update of Global In-channel Tx Test Annex in 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#441 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187844 pCR for PDCCH Demod in FR1 5.3.2.2 pCR

revision of R5-187608

Qualcomm CDMA Technologies 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

withdrawn [WTS] [JSN]
R5-187845 section 4 of 38.521-4 spec pCR

revision of R5-187600

Qualcomm Finland RFFE Oy 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

approved [WTS] [JSN]
R5-187846 pCR-FDD-PDSCH-FR1-Test 5.2.2.1 pCR

revision of R5-187602

Qualcomm CDMA Technologies 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

withdrawn [WTS] [JSN]
R5-187847 Resubmission of R5-186252 with modifications pCR

revision of R5-186702

ROHDE & SCHWARZ 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-187848 FR2 Spurious Emission measurement grids and offset values CR Qualcomm Inc, Anritsu. 38.903 15.0.0 CR#81 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

agreed [WTS] [JSN]
R5-187849 Adding applicability for new 38.521-1 CA TCs CR Samsung 38.522 15.0.0 CR#141 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.8

agreed [WTS] [JSN]
R5-187850 Completion of TC 9.1.69 and 9.1.70 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#22901 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187851 Completion of TC 9.2.56 and 9.2.57 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#22911 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187852 Discussion on Applicability and Test selection criteria for RRM CA test cases discussion

revision of R5-187596

Qualcomm Japan Inc LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.11

noted [WTS] [JSN]
R5-187853 Addition of Test Case selection criteria for RRM CA CR Qualcomm Japan Inc 36.521-3 15.3.0 CR#23491 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187854 Update on Applicability and Procedure for generic duplex mode RRM test case 8.16.86 CR Qualcomm Japan Inc 36.521-3 15.3.0 CR#23501 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187855 Chapter 9 RRM Generic CA tests - Annexes CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#22921 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187856 Correction to 3DL CA clause 8 generic duplex mode tests CR Anritsu 36.521-3 15.3.0 CR#23271 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187857 Introduction of 4 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes CR LG Electronics 36.521-3 15.3.0 CR#23361 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187858 Introduction of 4 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes CR LG Electronics 36.521-3 15.3.0 CR#23371 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187859 Introduction of 5 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes CR LG Electronics 36.521-3 15.3.0 CR#23381 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187860 Introduction of 5 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes CR LG Electronics 36.521-3 15.3.0 CR#23391 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-187861 Update of V2X RF Receiver Test Cases for Intra-band contiguous CR SGS Wireless 36.521-1 15.3.1 CR#46291 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.3

agreed [WTS] [JSN]
R5-187862 Editorial: 6.2.2EC, UE Maximum Output Power for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#45601 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187863 Updated RRM clause 4 tests to cover Cat-M2 requirement CR Bureau Veritas 36.521-3 15.3.0 CR#23321 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-187864 Testing of fallback CA configurations in Rx CA test cases other than REFSENS discussion

revision of R5-187479

Ericsson, CETECOM LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.11

noted [WTS] [JSN]
R5-187865 TP analyses for new Rel-15 CA configurations CR CETECOM GmbH 36.905 15.2.0 CR#1651 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.

agreed [WTS] [JSN]
R5-187866 Update TC 6.6.3G.2_1 CR

revision of R5-187098

Huawei, HiSilicon 36.521-1 15.3.1 CR#45731 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.3

revised [WTS] [JSN]
R5-187867 Inter-band con-current V2X configurations- Add 3A_47A Spurious Emission Test points analysis CR Huawei, HiSilicon 36.905 15.2.0 CR#1581 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.8

agreed [WTS] [JSN]
R5-187868 Inter-band con-current V2X configurations- Add 5A_47A Spurious Emission Test points analysis CR Huawei, HiSilicon 36.905 15.2.0 CR#1671 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.8

agreed [WTS] [JSN]
R5-187869 Add band group FDD B1 and B2 to RSRQ tests - Rel11 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#23021 catF TEI11_Test Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187870 Add band group FDD B1 and B2 to RSRQ tests - Rel12 CR ROHDE & SCHWARZ 36.521-3 15.3.0 CR#23031 catF TEI12_Test Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187871 Update test case to cover band 46 for test cases 7.6.1A.7 and 7.6.1A.8 CR CGC Inc. 36.521-1 15.3.1 CR#46381 catF TEI11_Test Rel-15 R5-81

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-187872 Update to test cases 7.6.1A.5 CR CGC Inc. 36.521-1 15.3.1 CR#46391 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-187873 Introduction of tc 6.2.3EC, Maximum Power Reduction (MPR) for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#45611 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187874 Introduction of tc 6.2.5EC Configured UE transmitted Power for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#45621 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187875 Introduction of tc 6.3.2EC, Minimum Output Power for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#45631 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187876 Introduction of tc 6.3.3EC, UE Transmit OFF power for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#45641 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187877 Introduction of 6.3.4EC.1, General ON/OFF time mask for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#45651 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187878 Introduction of 6.3.5EC.1, Power Control Absolute power tolerance for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#45661 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187879 Introduction of 6.3.5EC.2, Power Control Relative power tolerance for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#45671 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187880 Introduction of 6.3.5EC.3, Aggregate power control tolerance for UE category M2 CR Ericsson 36.521-1 15.3.1 CR#45681 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187881 Update Clause 1 Scope of TS 38.522 CR CMCC 38.522 15.0.0 CR#81 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187882 Update Clause 3 of TS 38.522 CR CMCC 38.522 15.0.0 CR#91 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187883 TP for Clause 4.1.1 of TS 38.522 CR CMCC 38.522 15.0.0 CR#101 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187884 TP for Clause 4.1.2 of TS 38.522 CR CMCC 38.522 15.0.0 CR#111 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187885 TP for Clause 4.1.3 of TS 38.522 CR CMCC 38.522 15.0.0 CR#121 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187886 FR2 Spurious Emission test case updates CR Qualcomm Finland RFFE Oy 38.521-2 15.0.0 CR#201 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187887 Addition of test frequencies for SUL band n81 CR Huawei, HiSilicon 38.508-1 15.1.0 CR#3511 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187888 Update of 6.2.4 Configured Output Power CR Huawei, HiSilicon 38.521-1 15.0.0 CR#1211 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187889 Addition of SUL condition CR

revision of R5-187419

Huawei, Hisilicon 38.508-1 15.1.0 CR#3921 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

withdrawn [WTS] [JSN]
R5-187890 Introduction of TC 6.5C.4 Transmit intermodulation for SUL CR Huawei, Hisilicon 38.521-1 15.0.0 CR#1561 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.18

agreed [WTS] [JSN]
R5-187891 FR2 UE RSRPB Function 38.509 CR Qualcomm CDMA Technologies 38.509 15.1.0 CR#111 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.3

agreed [WTS] [JSN]
R5-187892 Removing the Editor's notes of SA messages and procedures for all FR1 test cases CR Huawei, HiSilicon 38.521-1 15.0.0 CR#1081 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187893 Update of FR1 6.2.2 MPR CR CAICT, Huawei, CMCC 38.521-1 15.0.0 CR#831 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187894 Addition of Time alignment error for UL-MIMO to TS38.521-1 CR China Unicom 38.521-1 15.0.0 CR#861 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187895 Introduction of New FR1 test case 6.3.3.6 SRS time mask CR MTCC, KTL 38.521-1 15.0.0 CR#1151 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187896 5G_FR1 Text update for 6.5.3.3 Additonal Spurious emission CR Qualcomm Incorporated 38.521-1 15.0.0 CR#1161 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187897 Update of test case 6.3.4.3, Power Control Relative power tolerance in 38.521-1 CR Ericsson 38.521-1 15.0.0 CR#1611 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187898 Addition of EVM equalizer spectral flatness test case 6.4.2.5 to TS 38.521-1 CR ROHDE & SCHWARZ 38.521-1 15.0.0 CR#1651 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187899 Introduction of test case for Frequency error for CA CR Samsung,CMCC 38.521-1 15.0.0 CR#991 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187900 Introduction of test cases for Transmit modulation quality for CA CR Samsung,CMCC 38.521-1 15.0.0 CR#1001 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187901 Introduction of test case for Spectrum emission mask for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#1011 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187902 Introduction of test case for NR ACLR for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#1021 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187903 Introduction of test case for UTRA ACLR for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#1031 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187904 Introduction of test case for General spurious emissions for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#1041 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187905 Introduction of test case for Spurious emission for UE co-existence for CA CR Samsung,CMCC 38.521-1 15.0.0 CR#1051 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187906 Introduction of test case for Transmit intermodulation for Inter-band CA CR Samsung,CMCC 38.521-1 15.0.0 CR#1061 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-187907 Test Point analysis for FR1 MPR test case CR CAICT, Huawei 38.905 15.0.0 CR#241 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-187908 Updates of MU in TS 38.521-1 Annex F during RAN5#81 CR

revision of R5-186563

NTT DOCOMO, INC. 38.521-1 15.0.0 CR#671 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

revised [WTS] [JSN]
R5-187909 Updates of TT in TS 38.521-1 Annex F during RAN5#81 CR

revision of R5-186564

NTT DOCOMO, INC. 38.521-1 15.0.0 CR#681 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

revised [WTS] [JSN]
R5-187910 Clarification of test channel BW and SCS selection discussion

revision of R5-187020

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187911 Addition of notes to clarify test point selection into general section of TS 38.521-1 CR NTT DOCOMO, INC. 38.521-1 15.0.0 CR#1181 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

agreed [WTS] [JSN]
R5-187912 Addition of notes to clarify test point selection into general section of TS 38.521-2 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#381 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187913 Addition of notes to clarify test point selection into general section of TS 38.521-3 CR NTT DOCOMO, INC. 38.521-3 15.0.0 CR#671 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-187914 Update of Global In-channel Tx Test Annex in 38.521-1 CR ROHDE & SCHWARZ 38.521-1 15.0.0 CR#1631 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

agreed [WTS] [JSN]
R5-187915 Introduction of FR1 7.4 Maximum input level CR CAICT, Huawei 38.521-1 15.0.0 CR#821 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

agreed [WTS] [JSN]
R5-187916 Editorial correction to 6.5.1A.2 Frequency error for CA CR Anritsu, Dekra 36.521-1 15.3.1 CR#45471 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187917 Correction to 6.2.4A.2_1 and 6.6.2.2A.2_1 CR Anritsu, CETECOM, DEKRA 36.521-1 15.3.1 CR#45561 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187918 Correction to the test configuration table of 7.3A.6 CR Anritsu 36.521-1 15.3.1 CR#45431 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-187919 Correction to frequency of CA_4A-7A for MSD with inter-band 2UL CR

revision of R5-187052

Anritsu 36.521-1 15.3.1 CR#45441 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.2

withdrawn [WTS] [JSN]
R5-187920 Discussion on LTE/NR power sharing in EN-DC for none anchor agnostic approach discussion

revision of R5-187469

Ericsson 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-187921 On measurement grids CR

revision of R5-187522

Keysight Technologies UK Ltd 38.521-2 15.0.0 CR#411 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187922 Removing FR2 test case 7.4 from TS 38.522 due to testability issue CR Huawei, HiSilicon, CAICT 38.522 15.0.0 CR#17 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.8

agreed [WTS] [JSN]
R5-187923 Definition of additional cells for IncMon RRM Test Cases CR Ericsson 36.508 15.3.0 CR#12051 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.4

agreed [WTS] [JSN]
R5-187924 Message content for IncMon RRM Test Cases CR Ericsson 36.508 15.3.0 CR#12061 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.4

agreed [WTS] [JSN]
R5-187925 Applicability for IncMon RRM Test Cases CR Ericsson, CGC Inc. 36.521-2 15.3.0 CR#7841 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.5

agreed [WTS] [JSN]
R5-187926 Correction of RRM IncMon TC 4.2.10 CR Ericsson 36.521-3 15.3.0 CR#23041 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187927 Correction of RRM IncMon TC 4.2.11 CR Ericsson 36.521-3 15.3.0 CR#23051 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187928 Correction of RRM IncMon TC 4.3.1.5 CR Ericsson 36.521-3 15.3.0 CR#23061 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187929 Correction of RRM IncMon TC 4.3.2A CR Ericsson 36.521-3 15.3.0 CR#23071 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187930 Correction of RRM IncMon TC 4.3.3A CR Ericsson 36.521-3 15.3.0 CR#23081 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187931 Correction of RRM IncMon TC 4.3.4.4 CR Ericsson 36.521-3 15.3.0 CR#23091 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187932 Correction of RRM IncMon TC 8.4.8 CR Ericsson 36.521-3 15.3.0 CR#23101 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187933 Correction of RRM IncMon TC 8.4.9 CR Ericsson 36.521-3 15.3.0 CR#23111 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187934 Correction of RRM IncMon TC 8.5.8 CR Ericsson 36.521-3 15.3.0 CR#23121 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187935 Correction of RRM IncMon TC 8.6.3 CR Ericsson 36.521-3 15.3.0 CR#23131 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187936 Correction of RRM IncMon TC 8.7.5 CR Ericsson 36.521-3 15.3.0 CR#23141 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187937 Correction of RRM IncMon TC 8.7A.1 CR Ericsson 36.521-3 15.3.0 CR#23151 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187938 Cell Configuration for IncMon RRM Test Cases CR Ericsson 36.521-3 15.3.0 CR#23161 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187939 New rows in Annex F tables for IncMon RRM Test Cases CR Ericsson 36.521-3 15.3.0 CR#23171 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-81

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-187940 Addition of new Test Configuration on TC 6.2.2A.2 CR DEKRA 36.521-1 15.3.1 CR#44991 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187941 Addition of new Test Configuration on TC 6.2.3A.2 CR DEKRA 36.521-1 15.3.1 CR#45001 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187942 Addition of new Test Configuration on TC 6.2.3A.2_1 CR DEKRA 36.521-1 15.3.1 CR#45011 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187943 Addition of new Test Configuration on TC 6.2.4A.2 CR DEKRA 36.521-1 15.3.1 CR#45021 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187944 Addition of new Test Configuration on TC 6.2.5A.3 CR DEKRA 36.521-1 15.3.1 CR#45041 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187945 Addition of new Test Configuration on TC 6.3.4A.1.2 CR DEKRA 36.521-1 15.3.1 CR#45051 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187946 Addition of new Test Configuration on TC 6.3.5A.1.2 CR DEKRA 36.521-1 15.3.1 CR#45061 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187947 Addition of new Test Configuration on TC 6.3.5A.3.2 CR DEKRA 36.521-1 15.3.1 CR#45071 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187948 Addition of new Test Configuration on TC 6.5.2A.1.2 CR DEKRA 36.521-1 15.3.1 CR#45091 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187949 Addition of new Test Configuration on TC 6.5.2A.1.2_1 CR DEKRA 36.521-1 15.3.1 CR#45101 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187950 Addition of new Test Configuration on TC 6.5.2A.2.2 CR DEKRA 36.521-1 15.3.1 CR#45111 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187951 Addition of new Test Configuration on TC 6.5.2A.3.2 CR DEKRA 36.521-1 15.3.1 CR#45121 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187952 Addition of new Test Configuration on TC 6.6.1A.2 CR DEKRA 36.521-1 15.3.1 CR#45131 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187953 Addition of new Test Configuration on TC 6.6.2.1A.2 CR DEKRA 36.521-1 15.3.1 CR#45141 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187954 Addition of new Test Configuration on TC 6.6.2.2A.2_1 CR DEKRA 36.521-1 15.3.1 CR#45151 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187955 Addition of new Test Configuration on TC 6.6.2.3A.2 CR DEKRA 36.521-1 15.3.1 CR#45171 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187956 Addition of new Test Configuration on TC 6.6.2.3A.2_1 CR DEKRA, CGC Inc. 36.521-1 15.3.1 CR#45181 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187957 Addition of new Test Configuration on TC 6.6.3.1A.2 CR DEKRA 36.521-1 15.3.1 CR#45191 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187958 Addition of new Test Configuration on TC 6.7A.2 CR DEKRA 36.521-1 15.3.1 CR#45201 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-187960 CA_3A-41A-42C(1UL) - Updates of test points analysis CR KDDI Corporation 36.905 15.2.0 CR#1621 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.

agreed [WTS] [JSN]
R5-187961 CA_3A-41C-42A(1UL) - Updates of test points analysis CR KDDI Corporation 36.905 15.2.0 CR#1631 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.

agreed [WTS] [JSN]
R5-187962 CA_3A-41C-42C(1UL) - Updates of test points analysis CR KDDI Corporation 36.905 15.2.0 CR#1641 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.

agreed [WTS] [JSN]
R5-187963 Update the general sections for Rel-14 NB-IOT (Editorial) CR CMCC, Huawei, HiSilicon 36.521-1 15.3.1 CR#45291 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.3

agreed [WTS] [JSN]
R5-187964 Update Rel-14 NB-IOT RRM test cases to support category NB2 CR CMCC, Huawei, HiSilicon 36.521-3 15.3.0 CR#23181 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 5.3.10.5

agreed [WTS] [JSN]
R5-187965 Aligning CA delta TiB in sub-clause 6.2.5.3 with TS 36.101 v15.4.0 CR Ericsson, Bureau Veritas, Anritsu 36.521-1 15.3.1 CR#45931 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187966 Aligning CA delta RiB in sub-clause 7.3.3 with TS 36.101 v15.4.0 CR Ericsson, Bureau Veritas, Anritsu 36.521-1 15.3.1 CR#45951 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187967 Correction in TC 7.3A.3 for CA configuration CA_2A-71A CR CETECOM GmbH 36.521-1 15.3.1 CR#46241 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187968 Correction in TC 7.3A.5 for CA configuration CA_2A-66A-71A CR CETECOM GmbH 36.521-1 15.3.1 CR#46251 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.2

agreed [WTS] [JSN]
R5-187969 Update for reference sensitivity TP analysis for CA_2A-66A-71A CA configuration CR CETECOM GmbH 36.905 15.2.0 CR#1661 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.

agreed [WTS] [JSN]
R5-187970 Change of applicability in UL 64QAM MPR and A-MPR tests due to UL 256QAM support CR CETECOM GmbH 36.521-1 15.3.1 CR#45871 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187971 Change of applicability in UL 64QAM A-SEM and ACLR and Additional spurious tests due to UL 256QAM support CR CETECOM GmbH 36.521-1 15.3.1 CR#45881 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187972 Addition of new UL 256QAM test case - MPR for inter-band CR CETECOM GmbH 36.521-1 15.3.1 CR#45971 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187973 Addition of new UL 256QAM test case - Annex F CR CETECOM GmbH 36.521-1 15.3.1 CR#46121 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-81

AI: 5.3.14.2

agreed [WTS] [JSN]
R5-187974 Introduction of Power Class 1 for B31 and B72 CR Airbus DS SLC 36.521-1 15.3.1 CR#45371 catF LTE_PC1_B31_B72-UEConTest Rel-15 R5-81

AI: 5.3.19.1

agreed [WTS] [JSN]
R5-187975 Introduction of Power Class 1 for B31 and B72 CR Airbus DS SLC 36.521-2 15.3.0 CR#7891 catF LTE_PC1_B31_B72-UEConTest Rel-15 R5-81

AI: 5.3.19.2

agreed [WTS] [JSN]
R5-187976 Introduction of the support of ProSe for B72 CR Airbus DS SLC 36.508 15.3.0 CR#12081 catF LTE450_B72_Europe_ProSe-UEConTest Rel-15 R5-81

AI: 5.3.20.1

agreed [WTS] [JSN]
R5-187977 Introduction of the support of ProSe for B72 CR Airbus DS SLC 36.521-1 15.3.1 CR#45361 catF LTE450_B72_Europe_ProSe-UEConTest Rel-15 R5-81

AI: 5.3.20.2

agreed [WTS] [JSN]
R5-187978 Introduction of B68 in ProSe test frequencies table CR Airbus DS SLC 36.508 15.3.0 CR#12091 catF TEI15_Test, LTE700_Europe_PPDR-UEConTest Rel-15 R5-81

AI: 5.4.1.1

agreed [WTS] [JSN]
R5-187979 Correction to TC 7.7B Spurious response for UL-MIMO CR CMCC 36.521-1 15.3.1 CR#45211 catF TEI15_Test Rel-15 R5-81

AI: 5.4.1.2

agreed [WTS] [JSN]
R5-187980 Updating test case 6.2.4A.2 Additional Maximum Power Reduction (A-MPR) for CA (inter-band DL CA and UL CA) CR Intel Corporation (UK) Ltd 36.521-1 15.3.1 CR#46351 catF TEI12_Test Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187981 Addition of B72 for test cases with 5MHz channel bandwidth CR Airbus DS SLC 36.521-2 15.3.0 CR#7901 catF TEI15_Test, LTE450_Europe_PPDR-UEConTest Rel-15 R5-81

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-187982 Addition of B72 for test cases with 5MHz channel bandwidth CR Airbus DS SLC 36.521-3 15.3.0 CR#23201 catF LTE450_Europe_PPDR-UEConTest, TEI15_Test Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187983 Editorial Changes for TS 37.571-1 CR PCTEST Engineering Lab 37.571-1 15.3.0 CR#2771 catF TEI15_Test Rel-15 R5-81

AI: 5.5.9

agreed [WTS] [JSN]
R5-187984 Updated RF clause 9.8 to cover Cat-M2 requirement CR Bureau Veritas 36.521-1 15.3.1 CR#45791 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.2

agreed [WTS] [JSN]
R5-187985 Updated RRM clause 5 tests to cover Cat-M2 requirement CR Bureau Veritas 36.521-3 15.3.0 CR#23331 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-187986 Updated RRM clause 6 tests to cover Cat-M2 requirement CR Bureau Veritas 36.521-3 15.3.0 CR#23341 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-187987 Updated RRM clause 7 tests to cover Cat-M2 requirement CR Bureau Veritas 36.521-3 15.3.0 CR#23351 catF LTE_feMTC-UEConTest Rel-15 R5-81

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-187988 Align CA information in clause 7.3A.0 with TS36.101 v15.4.0 CR Bureau Veritas 36.521-1 15.3.1 CR#45811 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-187989 Added ICS item for missing Category DL and UL CR Bureau Veritas 36.521-2 15.3.0 CR#7951 catF TEI12_Test Rel-15 R5-81

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-187990 Update of test case 9.6.1.1_A.4 CR TTA, Bureau Veritas 36.521-1 15.3.1 CR#46101 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-187991 Alignment of 256QAM EVM Test Tolerance between LTE and NR CR Intel Deutschland GmbH 36.521-1 15.3.1 CR#45391 catF TEI14_Test Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187992 Updating test case 6.6.2.2 Additional spectrum emission mask and test case 6.6.3.3 Additional spurious emission CR Intel Corporation (UK) Ltd 36.521-1 15.3.1 CR#46341 catF TEI14_Test Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-187993 Update NB-IOT Random Access test cases 6.2.16, 6.2.17 and 6.2.18 CR Huawei, HiSilicon 36.521-3 15.3.0 CR#23211 catF TEI13_Test Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-187994 Update 8.16.78 to add TT information CR Huawei, HiSilicon 36.521-3 15.3.0 CR#23191 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.4

agreed [WTS] [JSN]
R5-187995 On RRM test case numbering discussion

revision of R5-186699

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

approved [WTS] [JSN]
R5-187996 TP on new RRM 5G Test Cases 6.7.1.1 and 6.7.1.2 pCR

revision of R5-186704

ROHDE & SCHWARZ 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-187997 New RRM 5G Test Cases 4.6.2.1 – 4.6.2.8 pCR

revision of R5-187403

Ericsson 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-187998 New RRM 5G Test Cases 5.6.2.1 – 5.6.2.4 pCR

revision of R5-187404

Ericsson 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-187999 New RRM 5G Test Cases 6.6.2.1 – 6.6.2.8 pCR

revision of R5-187405

Ericsson 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-188000 New RRM 5G Test Cases 7.6.2.1 – 7.6.2.4 pCR

revision of R5-187406

Ericsson 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-188001 TP for addition of NR RRM TC 4.4.1.1 EN-DC FR1 UE transmit timing accuracy pCR

revision of R5-187578

Qualcomm Japan Inc 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-188002 TP on new RRM 5G Test Cases 4.7.1.1 and 4.7.1.2 pCR

revision of R5-186703

ROHDE & SCHWARZ 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-188003 On RRM FR1 MU and TT analysis discussion

revision of R5-186700

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188004 On RRM test frequency selection for FR1 and FR2 discussion

revision of R5-187391

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188005 TP on Annexes for TS 38.533 pCR

revision of R5-186705

ROHDE & SCHWARZ 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-188006 new TC for PDSCH FR1 demod pCR

revision of R5-186678

Qualcomm Finland RFFE Oy 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

approved [WTS] [JSN]
R5-188007 discussion on demod spec structure discussion

revision of R5-187603

Qualcomm Finland RFFE Oy 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188008 new TC for PDSCH FR2 demod pCR

revision of R5-187570

Qualcomm Finland RFFE Oy 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

approved [WTS] [JSN]
R5-188009 pCR for new TC addition for FR1 FDD PDSCH Demod pCR

revision of R5-187824

Qualcomm CDMA Technologies 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

approved [WTS] [JSN]
R5-188010 pCR for new TC addition for FR1 FDD PDCCH Demod pCR

revision of R5-187830

Qualcomm CDMA Technologies 38.521-4 0.1.1 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.7

approved [WTS] [JSN]
R5-188011 pCR for Addition of Test Case 4.4.3.1 EN-DC FR1 timing advance adjustment accuracy pCR

revision of R5-187263

Qualcomm CDMA Technologies 38.533 0.0.2 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.9

approved [WTS] [JSN]
R5-188012 Introduction of New test case 6.4B.2.2.3 In-band Emissions for intra-band non-contiguous EN-DC CR KTL 38.521-3 15.0.0 CR#571 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188013 Addition OBW intra-band contiguous EN-DC CR Keysight Technologies UK Ltd 38.521-3 15.0.0 CR#501 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188014 Addition SEM intra-band contiguous EN-DC CR Keysight Technologies UK Ltd 38.521-3 15.0.0 CR#511 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188015 Additonal Spurious Emissions for Intra-band contiguous EN-DC CR Qualcomm Incorporated 38.521-3 15.0.0 CR#641 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188016 Additonal Spurious Emissions for Intra-band non-contiguous EN-DC CR Qualcomm Incorporated 38.521-3 15.0.0 CR#651 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188017 Additonal Spurious emission for inter-band EN-DC CR Qualcomm Incorporated 38.521-3 15.0.0 CR#661 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188018 Spurious emission band UE co-existence for intra-band non-contiguous EN-DC CR Qualcomm Incorporated 38.521-3 15.0.0 CR#681 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-188019 Introduction of In-band Emissions for intra-band contiguous EN-DC CR LG Electronics 38.521-3 15.0.0 CR#721 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188020 Addition of TC6.3B.3.1 Tx ON/OFF time mask for intra-band contiguous EN-DC CR SGS Wireless 38.521-3 15.0.0 CR#731 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188021 Addition of TC6.3B.3.2 Tx ON/OFF time mask for intra-band non-contiguous EN-DC CR SGS Wireless 38.521-3 15.0.0 CR#741 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188022 Addition of TC6.3B.3.3 Tx ON/OFF time mask for inter-band EN-DC within FR1 CR SGS Wireless 38.521-3 15.0.0 CR#751 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188023 Update of test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC for NS_04 CR Ericsson-LG Co., LTD 38.521-3 15.0.0 CR#801 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188024 Update of test case 6.2B.3.1 UE A-MPR for Intra-band contiguous EN-DC for NS_04 CR Ericsson-LG Co., LTD 38.521-3 15.0.0 CR#811 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.1

agreed [WTS] [JSN]
R5-188025 Update Clause 7.5B.3 in TS 38.521-3 CR CMCC 38.521-3 15.0.0 CR#381 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

agreed [WTS] [JSN]
R5-188026 5G NR_EN_DC with FR1_Text update for Inter-Band RX sensitivity CR Qualcomm Inc 38.521-3 15.0.0 CR#411 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

agreed [WTS] [JSN]
R5-188027 Update TC 7.4B.3 CR Huawei, Hisilicon 38.521-3 15.0.0 CR#821 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

agreed [WTS] [JSN]
R5-188028 Updates of MU in TS 38.521-3 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-3 15.0.0 CR#361 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-188029 Updates of TT in TS 38.521-3 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-3 15.0.0 CR#371 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-188030 Necessity for functional testing in RAN5 discussion

revision of R5-187022

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188031 Addition of 2TX_UL_MIMO condition CR Huawei, Hisilicon 38.508-1 15.1.0 CR#3911 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

agreed [WTS] [JSN]
R5-188032 Addition of 6.3D.4.1 Absolute Power tolerance for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#751 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-188033 Addition of 6.3D.4.2 Relative Power Tolerance for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#761 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-188034 Addition of 6.3D.4.3 Aggregate Power tolerance for UL-MIMO CR China Telecommunications 38.521-1 15.0.0 CR#771 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-188035 Update to FR1 test case 6.3.3.4 PRACH time mask CR KTL 38.521-1 15.0.0 CR#1101 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-188036 Adding TT to Aggregate Power Tolerance TC CR

revision of R5-187457

Intel Corporation (UK) Ltd 38.521-1 15.0.0 CR#1601 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

withdrawn [WTS] [JSN]
R5-188037 Removing the Editor's notes of SA messages and procedures for all FR2 test cases CR Huawei, HiSilicon 38.521-2 15.0.0 CR#321 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

agreed [WTS] [JSN]
R5-188038 FR2 downlink signal level(38.521-2) CR Anritsu 38.521-2 15.0.0 CR#361 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188039 LTE Anchor Link configuration for FR2 CR Anritsu 38.521-3 15.0.0 CR#931 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-188040 Correction of RB allocation for 3DL_CA_1A-3A-41A CR Qualcomm Incorporated 36.521-1 15.3.1 CR#46081 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-188041 Addition CA 2A2A29A and CA 2A2A29A30A 36.521-2 CR ECIT, CAICT, Tejet 36.521-2 15.3.0 CR#7801 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

agreed [WTS] [JSN]
R5-188042 Addition CA 2A29A66A 36.521-2 CR ECIT, CAICT, Tejet 36.521-2 15.3.0 CR#7811 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

agreed [WTS] [JSN]
R5-188043 Addition CA 2A30A66A66A 36.521-2 CR ECIT, CAICT, Tejet 36.521-2 15.3.0 CR#7821 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

agreed [WTS] [JSN]
R5-188044 Addition CA 7A66A and CA 2A7A66A 36.521-2 CR ECIT, CAICT, Tejet 36.521-2 15.3.0 CR#7831 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 5.3.4.3

agreed [WTS] [JSN]
R5-188045 Addition CA 2A2A7A and CA 2A2A7A66A 36.521-2 CR ECIT, CAICT, Tejet 36.521-2 15.3.0 CR#7741 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

agreed [WTS] [JSN]
R5-188046 Addition CA 2A2A14A and CA 2A2A14A30A and CA 2A2A14A66A and CA 2A2A14A30A66A 36.521-2 CR ECIT, CAICT, Tejet 36.521-2 15.3.0 CR#7751 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

agreed [WTS] [JSN]
R5-188047 Addition CA 2A12A30A66A66A 36.521-2 CR ECIT, CAICT 36.521-2 15.3.0 CR#7761 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

agreed [WTS] [JSN]
R5-188048 CA 2A14A30A66A66A 36.521-2 CR ECIT, CAICT, Tejet 36.521-2 15.3.0 CR#7771 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

agreed [WTS] [JSN]
R5-188049 Addition CA 2A14A66A66A and CA 2A2A14A66A66A 36.521-2 CR ECIT, CAICT, Tejet 36.521-2 15.3.0 CR#7781 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

agreed [WTS] [JSN]
R5-188050 Addition CA 2A29A30A66A 36.521-2 CR ECIT, CAICT 36.521-2 15.3.0 CR#7791 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 5.3.13.3

agreed [WTS] [JSN]
R5-188051 Correction to the MU for UL CA CR Anritsu 36.521-1 15.3.1 CR#45591 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-81

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-188052 Editorial correction to FS3 RRM clause 8 Tests CR Anritsu 36.521-3 15.3.0 CR#2351 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-188053 MPR for CA (intra-band contiguous DL CA and UL CA) CR Sprint Corporation 36.521-1 15.3.1 CR#4641 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.1

revised [WTS] [JSN]
R5-188054 Further LS on Carrier Aggregation RF Receiver test cases optimization LS out

LS is reply to R5-186421

LS To: PTCRB PVG

TSG WG RAN5 R5-81

AI: 7.5

approved [WTS] [JSN]
R5-188055 Discussion on Mid test channel bandwidth in Band n257 discussion

revision of R5-187214

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188056 NR FR2 TT Proposal discussion

revision of R5-186888

Telecom Italia, AT&T, China Mobile, China Telecom, China Unicom, DISH Network, Orange, Sprint, Vodafone 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188057 Consideration of TT values in different frequency ranges for FR2 discussion

revision of R5-187235

Apple Inc., Intel Corporation, vivo, Huawei, Hisilicon Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188058 NR FR2 TT Way Forward discussion Telecom Italia, Orange, Vodafone, CMCC, China Unicom, Qualcomm, AT&T, Ericsson, NTT DoCoMo, Verizon, Dish, Intel, Apple R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188059 Addition of descriptions on new MU contributions CR

revision of R5-187337

Anritsu 38.903 15.0.0 CR#171 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

revised [WTS] [JSN]
R5-188060 Update of MU budget and contributor description to TR 38.903 CR ROHDE & SCHWARZ 38.903 15.0.0 CR#191 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

agreed [WTS] [JSN]
R5-188061 Discussion on Measurement Uncertainty in FR2 discussion

revision of R5-187591

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188062 TRP uncertainties correction discussion

revision of R5-187521

revised to R5-188231

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

revised [WTS] [JSN]
R5-188063 Update of FR2 6.3.2 Transmit OFF power CR CAICT, Huawei 38.521-2 15.0.0 CR#271 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

agreed [WTS] [JSN]
R5-188065 Meeting notes of offline discussion on FR2 MU contributors discussion Anritsu R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188066 Update TC 6.6.3G.2_1 CR Huawei, HiSilicon 36.521-1 15.3.1 CR#45732 catF LTE_V2X-UEConTest Rel-15 R5-81

AI: 5.3.8.3

agreed [WTS] [JSN]
R5-188100 Update of 5G-NR test cases applicability CR

revision of R5-187543

revised to R5-188180

Qualcomm Incorporated, Motorola Mobility, MCC TF160, Huawei, HiSilicon, Rohde & Schwarz, Intertek 38.523-2 15.1.0 CR#311 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

revised [WTS] [JSN]
R5-188101 CR of 5G_NR_NAS_Applicability CR

revision of R5-186981

Huawei, Hisilicon 38.523-2 15.1.0 CR#241 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-188102 Correction to Selection Expressions CR

revision of R5-187116

Motorola Mobility, MCC TF160 38.523-2 15.1.0 CR#261 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-188103 Update of applicability and selection expressions CR Motorola Mobility, MCC TF160 38.523-2 15.1.0 CR#33 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

agreed [WTS] [JSN]
R5-188104 Adding new test case applicability CR MediaTek Inc. 38.523-2 15.1.0 CR#301 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

agreed [WTS] [JSN]
R5-188105 EN-DC test model handling of different types of bearers CR MCC TF160 38.523-3 15.1.0 CR#101 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.6

agreed [WTS] [JSN]
R5-188106 SA Option2: Initial Test Model aspects CR MCC TF160 38.523-3 15.1.0 CR#121 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.6

agreed [WTS] [JSN]
R5-188107 Updates to PDU session establishment 5GSM messages CR Ericsson 38.508-1 15.1.0 CR#3672 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-188108 Addition CA 2A2A29A and CA 2A2A29A30A 36.523-2 CR ECIT 36.523-2 15.3.0 CR#12241 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 6.3.4.3

agreed [WTS] [JSN]
R5-188109 Addition CA 2A29A66A 36.523-2 CR ECIT 36.523-2 15.3.0 CR#12251 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 6.3.4.3

agreed [WTS] [JSN]
R5-188110 Addition CA 2A30A66A66A 36.523-2 CR ECIT 36.523-2 15.3.0 CR#12261 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 6.3.4.3

agreed [WTS] [JSN]
R5-188111 Addition CA 7A66A and CA 2A7A66A 36.523-2 CR ECIT 36.523-2 15.3.0 CR#12271 catF LTE_CA_R14-UEConTest Rel-15 R5-81

AI: 6.3.4.3

agreed [WTS] [JSN]
R5-188112 Addition CA 2A2A7A and CA 2A2A7A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#12181 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

agreed [WTS] [JSN]
R5-188113 Addition CA 2A2A14A and CA 2A2A14A30A and CA 2A2A14A66A and CA 2A2A14A30A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#12191 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

agreed [WTS] [JSN]
R5-188114 Addition CA 2A12A30A66A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#12201 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

agreed [WTS] [JSN]
R5-188115 Addition CA 2A14A30A66A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#12211 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

agreed [WTS] [JSN]
R5-188116 Addition CA 2A14A66A66A and CA 2A2A14A66A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#12221 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

agreed [WTS] [JSN]
R5-188117 Addition CA 2A29A30A66A 36.523-2 CR ECIT, CAICT, Tejet 36.523-2 15.3.0 CR#12231 catF LTE_CA_R15-UEConTest Rel-15 R5-81

AI: 6.3.13.3

agreed [WTS] [JSN]
R5-188118 Alignments of UE Test Loop Mode H description CR MCC TF160 36.509 13.7.0 CR#1981 catF TEI13_Test, NB_IOT-UEConTest Rel-13 R5-81

AI: 6.4.2

agreed [WTS] [JSN]
R5-188119 Alignments of UE Test Loop Mode H description CR MCC TF160 36.509 14.5.0 CR#1991 catA TEI13_Test, NB_IOT-UEConTest Rel-14 R5-81

AI: 6.4.2

agreed [WTS] [JSN]
R5-188120 Alignments of UE Test Loop Mode H description CR MCC TF160 36.509 15.1.0 CR#2001 catA TEI13_Test, NB_IOT-UEConTest Rel-15 R5-81

AI: 6.4.2

agreed [WTS] [JSN]
R5-188121 Correction to eMDT2 test case 8.6.1.3 CR

revision of R5-186897

Intel Corporation (UK) Ltd, Keysight Technologies UK Ltd., Keysight 36.523-1 15.3.0 CR#46701 catF TEI13_Test Rel-15 R5-81

AI: 6.4.3.3.5

revised [WTS] [JSN]
R5-188122 Update chapter 4.5.2 RRC_IDLE CR Ericsson 38.508-1 15.1.0 CR#2602 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-188123 Update chapter 4.5.4 RRC_CONNECTED CR Ericsson 38.508-1 15.1.0 CR#2501 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

agreed [WTS] [JSN]
R5-188124 Addition of general test procedures for 5GC testing CR

revision of R5-187311

CATT, TDIA 38.508-1 15.1.0 CR#3851 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.1

withdrawn [WTS] [JSN]
R5-188125 Add PICS for 5GMM implementation cabilities CR

revision of R5-186939

MediaTek Inc. 38.508-2 15.1.0 CR#81 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.2

withdrawn [WTS] [JSN]
R5-188126 Addition of NR test case 6.1.1.2_PLMN selection of Other PLMN CR

revision of R5-186944

Huawei, Hisilicon 38.523-1 15.1.0 CR#1881 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188127 Addition of NR test case 6.1.1.3_Cell reselection of ePLMN CR

revision of R5-186945

Huawei, Hisilicon 38.523-1 15.1.0 CR#1891 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188128 Addition of NR test case 6.1.1.4_PLMN selection in shared network environment CR

revision of R5-186946

Huawei, Hisilicon 38.523-1 15.1.0 CR#1901 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188129 Addition of NR test case 6.1.1.5_PLMN selection CR

revision of R5-186947

Huawei, Hisilicon 38.523-1 15.1.0 CR#1911 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188130 Addition of NR test case 6.1.2.1_Cell selection_Qrxlevmin CR

revision of R5-186948

Huawei, Hisilicon 38.523-1 15.1.0 CR#1921 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188131 Addition of NR test case 6.1.2.2_Cell selection_Qqualmin CR

revision of R5-186949

Huawei, Hisilicon 38.523-1 15.1.0 CR#1931 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188132 Addition of NR test case 6.1.2.3_Cell selection_Serving cell bar CR

revision of R5-186950

Huawei, Hisilicon 38.523-1 15.1.0 CR#1941 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188133 Addition of NR test case 6.1.2.4_Cell selection_Serving cell Squal below Zero CR

revision of R5-186951

Huawei, Hisilicon 38.523-1 15.1.0 CR#1951 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188134 Addition of NR test case 6.1.2.5_Cell Reselection CR

revision of R5-186952

Huawei, Hisilicon 38.523-1 15.1.0 CR#1961 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188135 Addition of NR test case 6.1.2.6_Cell Reselection for interband operation CR

revision of R5-186953

Huawei, Hisilicon 38.523-1 15.1.0 CR#1971 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188136 Addition of NR test case 6.1.2.9_Cell Reselection using Qhyst, Qoffset and Treselection CR

revision of R5-186954

Huawei, Hisilicon 38.523-1 15.1.0 CR#1981 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188137 Addition of NR test case 6.1.2.20_Inter-frequency cell reselection according to priority CR

revision of R5-186955

Huawei, Hisilicon 38.523-1 15.1.0 CR#1991 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188138 Addition of NR test case 6.1.2.21_Cell reselection,SIntra SearchQ and SnonIntraSeqrchQ CR

revision of R5-186956

Huawei, Hisilicon 38.523-1 15.1.0 CR#2001 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188139 Addition of NR test case 6.1.2.22_Inter-frequency cell reselection with parameters ThreshX, HighQ, ThreshX, LowQ and ThreshServing, LowQ CR

revision of R5-186957

Huawei, Hisilicon 38.523-1 15.1.0 CR#2011 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.2

withdrawn [WTS] [JSN]
R5-188140 Addition of NR test case 7.1.1.2.4_BCCH HARQ CR

revision of R5-186961

Huawei, Hisilicon 38.523-1 15.1.0 CR#2051 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

revised [WTS] [JSN]
R5-188141 CR of NR test case 7.1.1.1.4_Beam Failure CR

revision of R5-186962

Huawei, Hisilicon 38.523-1 15.1.0 CR#2061 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-188142 CR of NR test case 7.1.1.3.7_Power Headroom Reporting CR

revision of R5-186964

Huawei, Hisilicon 38.523-1 15.1.0 CR#2081 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-188143 CR of NR test case 7.1.1.5.4_DRX CR

revision of R5-186965

Huawei, Hisilicon 38.523-1 15.1.0 CR#2091 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-188144 CR of NR test case 7.1.1.6.1_Correct handling of DL assignmentSemi persistent CR

revision of R5-186966

Huawei, Hisilicon 38.523-1 15.1.0 CR#2101 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-188145 CR of NR test case 7.1.1.6.2_configured grant Type 1 CR

revision of R5-186967

Huawei, Hisilicon 38.523-1 15.1.0 CR#2111 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-188146 CR of NR test case 7.1.1.6.3_configured grant Type 2 CR

revision of R5-186968

Huawei, Hisilicon 38.523-1 15.1.0 CR#2121 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

withdrawn [WTS] [JSN]
R5-188147 Addition of NR test case 8.1.1.1.2_Paging CR

revision of R5-186970

Huawei, Hisilicon 38.523-1 15.1.0 CR#2141 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

withdrawn [WTS] [JSN]
R5-188148 Addition of NR test case 8.1.1.2.1_RRC connection establishment CR

revision of R5-186971

Huawei, Hisilicon 38.523-1 15.1.0 CR#2151 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

withdrawn [WTS] [JSN]
R5-188149 Addition of NR test case 8.1.3.1.1_Event A1 CR

revision of R5-186974

Huawei, Hisilicon 38.523-1 15.1.0 CR#2181 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

revised [WTS] [JSN]
R5-188150 New NAS test case 9.1.5.1.2 CR

revision of R5-186573

ROHDE & SCHWARZ 38.523-1 15.1.0 CR#1421 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188151 New NAS test case 9.1.6.1.4 CR

revision of R5-186574

ROHDE & SCHWARZ 38.523-1 15.1.0 CR#1431 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188152 Addition of new 5GC TC 9.1.5.1.10 CR

revision of R5-186634

CAICT 38.523-1 15.1.0 CR#1441 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188153 Addition of new 5GC TC 9.1.5.1.11 CR

revision of R5-186635

CAICT 38.523-1 15.1.0 CR#1451 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188154 Addition of new 5GC TC 9.1.6.1.6 CR

revision of R5-186685

MediaTek Inc. 38.523-1 15.1.0 CR#1641 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188155 Addition of new 5GC TC 9.1.6.2.8 CR

revision of R5-186687

MediaTek Inc. 38.523-1 15.1.0 CR#1661 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188156 Addition of new 5GC TC 9.1.6.2.10 CR

revision of R5-186747

MediaTek Inc. 38.523-1 15.1.0 CR#1701 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188157 Addition of new 5GS mobility management TC 9.1.7.1 CR

revision of R5-186755

Tejet,ZTE,SRTC 38.523-1 15.1.0 CR#1731 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188158 Addition of new 5GS mobility management TC 9.1.7.2 CR

revision of R5-186757

Tejet,ZTE,SRTC 38.523-1 15.1.0 CR#1741 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188159 Addition of NR test case 9.1.5.1.1_Registration Request CR Huawei, Hisilicon, CAICT, CATT, Samsung, TF160, R&S, Motorola, Ericsson, Qualcomm 38.523-1 15.1.0 CR#2222 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

agreed [WTS] [JSN]
R5-188160 Addition of new TC 9.1.8.4 CR

revision of R5-187269

Starpoint, TDIA, CATT 38.523-1 15.1.0 CR#2581 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188161 Addition of new TC 9.1.8.6 CR

revision of R5-187301

Starpoint, TDIA, CATT 38.523-1 15.1.0 CR#2591 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188162 Addition of new 5GC TC 9.1.5.2.2 CR

revision of R5-187303

CATT, TDIA 38.523-1 15.1.0 CR#2611 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188163 Addition of new TC 9.1.8.7 CR

revision of R5-187305

Starpoint, TDIA, CATT 38.523-1 15.1.0 CR#2621 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188164 Addition of new TC 9.1.8.11 CR

revision of R5-187316

Starpoint, TDIA, CATT 38.523-1 15.1.0 CR#2641 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188165 Addition of new 5GC TC 9.1.2.1 CR

revision of R5-187325

TDIA, CATT 38.523-1 15.1.0 CR#2651 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188166 Addition of new 5GC TC 9.1.8.13 CR

revision of R5-187351

CAICT 38.523-1 15.1.0 CR#2671 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188167 Addition of new 5GC TC 9.1.8.17 CR

revision of R5-187355

CAICT 38.523-1 15.1.0 CR#2681 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

withdrawn [WTS] [JSN]
R5-188168 Addition of new 5GC TC 10.1.3.4 CR

revision of R5-186638

CAICT 38.523-1 15.1.0 CR#1481 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188169 Addition of new 5GC TC 10.1.3.5 CR

revision of R5-186639

CAICT 38.523-1 15.1.0 CR#1491 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188170 Addition of new 5GC TC 10.1.3.6 CR

revision of R5-186640

CAICT 38.523-1 15.1.0 CR#1501 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188171 Addition of new 5GC TC 10.1.3.7 CR

revision of R5-186642

CAICT 38.523-1 15.1.0 CR#1511 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188172 Addition of new 5GC TC 10.1.3.8 CR

revision of R5-186644

CAICT 38.523-1 15.1.0 CR#1521 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188173 Addition of new 5GC TC 10.1.6.1 CR

revision of R5-186645

CAICT 38.523-1 15.1.0 CR#1531 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188174 Addition of new 5GC TC 10.1.6.2 CR

revision of R5-186646

CAICT 38.523-1 15.1.0 CR#1541 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188175 Addition of new 5GC TC 10.1.6.3 CR

revision of R5-186647

CAICT 38.523-1 15.1.0 CR#1551 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188176 Addition of 5GC Test case 10.1.4.1 CR

revision of R5-186658

ANRITSU LTD 38.523-1 15.1.0 CR#1611 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188177 Addition of 5GC test case 10.1.2.1 CR

revision of R5-187356

CATT, TDIA 38.523-1 15.1.0 CR#2691 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188178 Addition of 5GC Test case 10.1.5.1 CR

revision of R5-187359

TDIA, CATT 38.523-1 15.1.0 CR#2711 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188179 CR of 5G_NR_Applicability CR

revision of R5-186980

Huawei, Hisilicon 38.523-2 15.1.0 CR#231 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

withdrawn [WTS] [JSN]
R5-188180 Update of 5G-NR test cases applicability CR

revision of R5-188100

Qualcomm Incorporated, Motorola Mobility, MCC TF160, Huawei, HiSilicon, Rohde & Schwarz, Intertek 38.523-2 15.1.0 CR#312 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

revised [WTS] [JSN]
R5-188181 Golden SIG test cases for SA option 2 discussion MCC TF160 R5-81

AI: 6.3.9.

postponed [WTS] [JSN]
R5-188182 Review deadlines for next quarter other

revision of R5-186418

WG Chairman R5-81

AI: 7.6

noted [WTS] [JSN]
R5-188183 Draft TS 38.533 v0.1.0 draft TS ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 7.5

noted [WTS] [JSN]
R5-188184 LS on the testability of FR2 transmitter and reception tests LS out

LS To: TSG WG RAN4

TSG WG RAN5 R5-81

AI: 7.5

approved [WTS] [JSN]
R5-188185 Reply LS to 5G/NR UE Conformance Test applicability for 5G S-Modules LS out

LS To: GTI

TSG WG RAN5 R5-81

AI: 7.5

postponed [WTS] [JSN]
R5-188186 draft RAN5#81 meeting report report ETSI Secretariat R5-81

AI: 7.7

reserved [WTS] [JSN]
R5-188187 Correction to NR MAC DRX test cases 7.1.1.5.1 and 7.1.1.5.2 CR ANRITSU LTD 38.523-1 15.1.0 CR#296 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-188188 Addition of NR test case 8.1.1.3.1_Redirection to NR CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2172 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

agreed [WTS] [JSN]
R5-188189 On the FR2 MU for occupied BW and ACLR discussion Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188190 Addition of NR test case 8.2.3.11.2_gapFR2 CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2252 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.3

agreed [WTS] [JSN]
R5-188191 Addition of 5GC test case 10.1.3.1 CR

revision of R5-187798

revised to R5-188203

CATT, TDIA, CAICT 38.523-1 15.1.0 CR#2702 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

revised [WTS] [JSN]
R5-188192 Addition of NR test case 7.1.1.2.4_BCCH HARQ CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2052 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-188193 Correcton to Layer 2 Pre Test conditions CR Motorola Mobility 38.523-1 15.1.0 CR#2952 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.3.1.2

agreed [WTS] [JSN]
R5-188194 Addition of NR test case 8.1.3.1.1_Event A1 CR Huawei, Hisilicon 38.523-1 15.1.0 CR#2182 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.1

agreed [WTS] [JSN]
R5-188195 Update to 5G TC TA registration update CR Samsung 38.523-1 15.1.0 CR#1832 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.5

agreed [WTS] [JSN]
R5-188196 Addition of test applicabilities for 5GC testcases CR CATT 38.523-2 15.1.0 CR#271 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

agreed [WTS] [JSN]
R5-188197 Update of 5G-NR test cases applicability CR Qualcomm Incorporated, Motorola Mobility, MCC TF160, Huawei, HiSilicon, Rohde & Schwarz, Intertek 38.523-2 15.1.0 CR#313 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.5

agreed [WTS] [JSN]
R5-188198 Applicability for NR NSA Option 3 protocol tests CR ROHDE & SCHWARZ 37.571-3 15.3.0 CR#1052 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.16

agreed [WTS] [JSN]
R5-188199 Removal of the test applicability for testcase 7.1.4.36 CR CATT 36.523-2 15.3.0 CR#12432 catF LTE_VoLTE_ViLTE_enh-UEConTest Rel-15 R5-81

AI: 6.3.10.6

agreed [WTS] [JSN]
R5-188200 Correction to NB-IoT Test case 22.3.1.9 CR TDIA, MCC TF160, CATT 36.523-1 15.3.0 CR#46771 catF NB_IOTenh-UEConTest Rel-15 R5-81

AI: 6.3.11.3

agreed [WTS] [JSN]
R5-188201 Correction to eMDT2 test case 8.6.1.3 CR Intel Corporation (UK) Ltd, Keysight Technologies UK Ltd., Keysight 36.523-1 15.3.0 CR#46702 catF TEI13_Test Rel-15 R5-81

AI: 6.4.3.3.5

agreed [WTS] [JSN]
R5-188202 Update of 5GS NR RRC test case 8.2.1.1.1 CR ROHDE & SCHWARZ, Qualcomm 38.523-1 15.1.0 CR#2802 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.4.2.1

agreed [WTS] [JSN]
R5-188203 Addition of 5GC test case 10.1.3.1 CR

revision of R5-188191

CATT, TDIA, CAICT 38.523-1 15.1.0 CR#2703 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 6.3.9.4.6

withdrawn [WTS] [JSN]
R5-188204 Applicability and ICS for CA RF and RRM test cases CR Ericsson, Rohde & Schwarz, Huawei, HiSilicon, KTL, SGS Wireless 36.521-2 15.3.0 CR#7911 catF LTE_CA_Rel13-UEConTest Rel-15 R5-81

AI: 5.3.2.3

agreed [WTS] [JSN]
R5-188205 Updates to Annex B to add Permitted OTA Test Methods CR PCTEST Engineering Lab 38.508-1 15.1.0 CR#3971 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.1

agreed [WTS] [JSN]
R5-188206 Introduction of New FR1 test case 6.3.3.7 PUSCH-PUCCH and PUSCH-SRS time masks CR MTCC, KTL 38.521-1 15.0.0 CR#1171 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.1

agreed [WTS] [JSN]
R5-188207 5G_FR1 Text update for 7.3A Reference sensitivity for CA CR Qualcomm Inc. 38.521-1 15.0.0 CR#711 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.2

agreed [WTS] [JSN]
R5-188208 Updates of MU in TS 38.521-1 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-1 15.0.0 CR#672 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

agreed [WTS] [JSN]
R5-188209 Updates of TT in TS 38.521-1 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-1 15.0.0 CR#682 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

agreed [WTS] [JSN]
R5-188210 TDD configuration for UE Tx test in FR1 CR Ericsson 38.521-1 15.0.0 CR#971 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

agreed [WTS] [JSN]
R5-188211 Core alignment CR to capture TS 38.101-1 updates during RAN4#89 CR NTT DOCOMO, INC. 38.521-1 15.0.0 CR#1191 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.4.3

agreed [WTS] [JSN]
R5-188212 Updates to maximum output power test cases CR Ericsson 38.521-2 15.0.0 CR#402 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.1

agreed [WTS] [JSN]
R5-188213 Update of FR2 test case 7.4 CR CAICT, Anritsu, Huawei 38.521-2 15.0.0 CR#281 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.2

agreed [WTS] [JSN]
R5-188214 Updates of TT in TS 38.521-2 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#251 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188215 TDD configuration for UE Tx test in FR2 CR Ericsson 38.521-2 15.0.0 CR#311 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188216 Core alignment CR to capture TS 38.101-2 updates during RAN4#89 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#391 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188217 On measurement grids CR Keysight Technologies UK Ltd 38.521-2 15.0.0 CR#412 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188218 Update to Annex K CR Qualcomm Austria RFFE GmbH 38.521-2 15.0.0 CR#431 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188219 Introduction of receiver spurious emission tests for FR1 inter-band EN-DC CR Anritsu 38.521-3 15.0.0 CR#621 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

agreed [WTS] [JSN]
R5-188220 Introduction of wideband intermodulation tests for FR1 inter-band EN-DC CR Anritsu 38.521-3 15.0.0 CR#631 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.2

agreed [WTS] [JSN]
R5-188221 LTE TDD configuration for UE Tx test in EN-DC CR Ericsson 38.521-3 15.0.0 CR#541 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-188222 Core alignment CR to capture TS 38.101-3 updates during RAN4#89 CR NTT DOCOMO, INC. 38.521-3 15.0.0 CR#691 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.6.3

agreed [WTS] [JSN]
R5-188223 Applicability for RRM NR tests CR ROHDE & SCHWARZ 38.522 15.0.0 CR#151 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.8

agreed [WTS] [JSN]
R5-188224 Update MU budget in TR 38.903 CR Keysight Technologies UK Ltd 38.903 15.0.0 CR#91 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

agreed [WTS] [JSN]
R5-188225 Update of MU budget tables in TR 38.903 CR Anritsu 38.903 15.0.0 CR#161 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

agreed [WTS] [JSN]
R5-188226 Addition of descriptions on new MU contributions CR Anritsu 38.903 15.0.0 CR#172 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.15

agreed [WTS] [JSN]
R5-188227 Test Point analysis for FR2 Maximum Output Power CR Ericsson 38.905 15.0.0 CR#411 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]
R5-188228 Consideration on MU contribution caused by antenna switching discussion

revision of R5-187228

Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188229 SNR estimation for low PSD tests discussion

revision of R5-187274

Anritsu 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188230 On Quality of Quiet Zone Evaluation for Spurious Emissions Test Cases discussion

revision of R5-187454

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188231 TRP uncertainties correction discussion

revision of R5-188062

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188232 Discussion on TS38.521-2 Annex K restructuring discussion

revision of R5-187569

Qualcomm Austria RFFE GmbH 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.17

noted [WTS] [JSN]
R5-188233 Introduction of FD-MIMO test cases in Annexes CR Ericsson 36.521-1 15.3.1 CR#46331 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-81

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-188234 Maximum Output Power for CA CR Sprint Corporaton 36.521-1 15.3.1 CR#45741 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.1

agreed [WTS] [JSN]
R5-188235 MPR for CA (intra-band contiguous DL CA and UL CA) CR Sprint Corporation 36.521-1 15.3.1 CR#46411 catF LTE_CA_C_B41_PC2-UEConTest Rel-15 R5-81

AI: 5.3.15.1

agreed [WTS] [JSN]
R5-188236 Correction to tested CA configuration selection criteria for Rx tests CR Bureau Veritas, Ericsson 36.521-2 15.3.0 CR#7961 catF TEI10_Test Rel-15 R5-81

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-188237 Correction to 8.26.7 FS3 Intra-frequency event triggered reporting CR Anritsu 36.521-3 15.3.0 CR#23291 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-81

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-188238 Addition to E-UTRA test frequencies for intra-band contiguous configuration for band 41 CR Ericsson, Sprint 38.508-1 15.1.0 CR#2422 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 7.2.3

agreed [WTS] [JSN]
R5-188239 Updates of MU in TS 38.521-2 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#241 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188240 Update of TR 38.905 with EN-DC A-MPR test point analyses, NS_04 CR Ericsson-LG Co., LTD 38.905 15.0.0 CR#391 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.16

agreed [WTS] [JSN]

1805 documents (1.1010129451752 seconds)