Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-184000 Agenda - opening session agenda WG Chairman R5-80

AI: 1

approved [WTS] [JSN]
R5-184001 Agenda - mid week session agenda WG Chairman R5-80

AI: 1

approved [WTS] [JSN]
R5-184002 Agenda - closing session agenda WG Chairman R5-80

AI: 1

noted [WTS] [JSN]
R5-184003 RAN5#80 Session Programme agenda WG Chairman R5-80

AI: 2.1

noted [WTS] [JSN]
R5-184004 RAN5 Leadership Team other WG Chairman R5-80

AI: 2.1

noted [WTS] [JSN]
R5-184005 RAN5#79 WG Minutes report ETSI Secretariat R5-80

AI: 2.1

approved [WTS] [JSN]
R5-184006 RAN5#79 WG Action Points report

revised to R5-184998

ETSI Secretariat R5-80

AI: 2.1

revised [WTS] [JSN]
R5-184007 draft RAN5#80 meeting report report ETSI Secretariat R5-80

AI: 2.1

noted [WTS] [JSN]
R5-184008 Latest RAN Plenary notes report WG Chairman R5-80

AI: 2.1

noted [WTS] [JSN]
R5-184009 Latest RAN Plenary draft Report report WG Chairman R5-80

AI: 2.1

noted [WTS] [JSN]
R5-184010 Post Plenary Active Work Item update other ETSI Secretariat R5-80

AI: 2.1

noted [WTS] [JSN]
R5-184011 RAN5 SR to RP#80 report WG Chairman R5-80

AI: 2.2

noted [WTS] [JSN]
R5-184012 TF160 SR to RP#80 report WG Chairman R5-80

AI: 2.2

noted [WTS] [JSN]
R5-184013 RAN Chair Report to SA#80 report WG Chairman R5-80

AI: 2.2

noted [WTS] [JSN]
R5-184014 RAN5#80 LS Template other WG Chairman R5-80

AI: 4.3

noted [WTS] [JSN]
R5-184015 RAN5 5GS Text Proposal / pCR cover sheet template other Ericsson R5-80

AI: 4.3

noted [WTS] [JSN]
R5-184016 Meeting schedule for 2018-19 other WG Chairman R5-80

AI: 4.4

noted [WTS] [JSN]
R5-184017 WI Progress and Target Completion Date Review other WG Chairman R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184018 Review deadlines for next quarter other WG Chairman R5-80

AI: 7.6

noted [WTS] [JSN]
R5-184019 LS on Settings for verifying RF requirements for Coherent UL MIMO LS in

source LS: R4-1806532

TSG WG RAN4 NR_newRAT R5-80

AI: 5.2

noted [WTS] [JSN]
R5-184020 LS on generic 3CC to 5CC RRM test cases LS in

source LS: R4-1807951

TSG WG RAN4 TEI13_Test R5-80

AI: 5.2

noted [WTS] [JSN]
R5-184021 Reply LS on the applicable requirements of the Power Class 2 capable UE LS in

LS is reply to R5-182022

source LS: R4-1808210

TSG WG RAN4 TEI8_Test R5-80

AI: 5.2

noted [WTS] [JSN]
R5-184022 LS on Measurement Grids LS in

source LS: R4-1808410

TSG WG RAN4 FS_NR_test_methods R5-80

AI: 5.2

noted [WTS] [JSN]
R5-184023 LS on Introducing optional channel bandwidth LS in

source LS: R4-1808508

TSG WG RAN4 NR_newRAT-Core R5-80

AI: 3

noted [WTS] [JSN]
R5-184024 Definition of and test methods for OTA unwanted emissions of IMT radio equipment LS in

source LS: 5D_TD_571Rev1

LS reply in R5-185147, R5-185147

ITU-R Working Party 5D R5-80

AI: 7.5

noted [WTS] [JSN]
R5-184025 LS reply on RAN4-RAN5 5G-NR RF pending issues: RMCs, OCNG patterns and FR2 RSRP accuracy LS in

LS is reply to R5-183931

source LS: R4-1809345

TSG WG RAN4 NR_newRAT-Core Rel-15 R5-80

AI: 5.2

noted [WTS] [JSN]
R5-184026 LS reply on RAN4-RAN5 5G-NR RF pending issues LS in

source LS: R4-1811037

TSG WG RAN4 NR_newRAT-Core R5-80

AI: 5.2

noted [WTS] [JSN]
R5-184027 dummy LS c LS in ETSI Secretariat R5-80

AI: 3

withdrawn [WTS] [JSN]
R5-184028 Addition of missing assistance data for modernized GPS and the GPS L5 signal for LTE minimum performance sub-test 4 CR

revised to R5-185421

Spirent Communications 37.571-5 15.2.0 CR#179 catF TEI9_Test Rel-15 R5-80

AI: 5.5.11

revised [WTS] [JSN]
R5-184029 Addition of missing assistance data for the Galileo E5A signal for LTE minimum performance sub-tests 3 and 8 CR Spirent Communications, European Commission 37.571-5 15.2.0 CR#180 catF TEI12_Test Rel-15 R5-80

AI: 5.5.11

agreed [WTS] [JSN]
R5-184030 Addition of missing assistance data for modernized GPS and the GPS L5 signal for the LTE signalling tests CR Spirent Communications 37.571-5 15.2.0 CR#181 catF TEI9_Test Rel-15 R5-80

AI: 6.5.7.4

agreed [WTS] [JSN]
R5-184031 Addition of missing assistance data for the Galileo E5A signal for LTE signalling tests CR Spirent Communications, European Commission 37.571-5 15.2.0 CR#178 catF TEI12_Test Rel-15 R5-80

AI: 6.5.7.4

withdrawn [WTS] [JSN]
R5-184032 Addition of PICS for support of LPP message segmentation in test 7.3.1.1 CR Spirent Communications 37.571-2 15.2.0 CR#107 catF TEI14_Test Rel-15 R5-80

AI: 6.5.7.1

withdrawn [WTS] [JSN]
R5-184033 Addition of PICS for support of LPP message segmentation CR Spirent Communications 37.571-3 15.2.0 CR#95 catF TEI14_Test Rel-15 R5-80

AI: 6.5.7.2

withdrawn [WTS] [JSN]
R5-184034 Correction of GNSS information for V2X tests CR Spirent Communications, European Commission 36.521-3 15.2.0 CR#2210 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

withdrawn [WTS] [JSN]
R5-184035 Deletion of Conditions for GNSS Reliability Requirements for V2X from Annex I.6 CR Spirent Communications, European Commission 36.521-3 15.2.0 CR#2211 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

withdrawn [WTS] [JSN]
R5-184036 Addition of missing assistance data for the Galileo E5A signal for LTE signalling tests CR Spirent Communications, European Commission 37.571-5 15.2.0 CR#182 catF TEI12_Test Rel-15 R5-80

AI: 6.5.7.4

agreed [WTS] [JSN]
R5-184037 Addition of PICS for support of LPP message segmentation in test 7.3.1.1 CR Spirent Communications 37.571-2 15.2.0 CR#108 catF TEI14_Test Rel-15 R5-80

AI: 6.5.7.1

agreed [WTS] [JSN]
R5-184038 Addition of PICS for support of LPP message segmentation CR Spirent Communications 37.571-3 15.2.0 CR#96 catF TEI14_Test Rel-15 R5-80

AI: 6.5.7.2

agreed [WTS] [JSN]
R5-184039 Correction of GNSS information for V2X tests CR

revised to R5-185536

Spirent Communications, European Commission 36.521-3 15.2.0 CR#2212 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

revised [WTS] [JSN]
R5-184040 Deletion of Conditions for GNSS Reliability Requirements for V2X from Annex I.6 CR Spirent Communications, European Commission 36.521-3 15.2.0 CR#2213 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-184041 Clarifications and corrections to Bluetooth identification test CR Spirent Communications 37.571-1 15.2.0 CR#266 catF TEI14_Test Rel-15 R5-80

AI: 5.5.9

agreed [WTS] [JSN]
R5-184042 Update RRCConnectionReconfiguration message for EN-DC CR

revised to R5-185164

Ericsson, Qualcomm Inc. 36.508 15.2.0 CR#1175 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.

revised [WTS] [JSN]
R5-184043 Update RRC CONNECTED state CR Ericsson 38.508-1 15.0.0 CR#1 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

withdrawn [WTS] [JSN]
R5-184044 Update EPS Session Management test case in section 10 of TS 36.523-1. CR

revised to R5-185136

FirstNet, AT&T 36.523-1 15.2.0 CR#4581 catF TEI14_Test Rel-15 R5-80

AI: 6.4.3.5

revised [WTS] [JSN]
R5-184045 Update Reference Table 6.6.2-1A dedicated EPS bearer contexts CR

revised to R5-185158

FirstNet, AT&T 36.508 15.2.0 CR#1176 catF TEI14_Test Rel-15 R5-80

AI: 6.4.1

revised [WTS] [JSN]
R5-184046 WP – UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) Work Plan Ericsson LTE_UL_CAP_enh-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184047 SR - UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) WI status report Ericsson LTE_UL_CAP_enh-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184048 Addition of IR.92 to SM-over-IP roles CR ROHDE & SCHWARZ, Ericsson 34.229-2 14.3.0 CR#246 catF TEI8_Test Rel-14 R5-80

AI: 6.5.6.2

agreed [WTS] [JSN]
R5-184049 WP - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 Work Plan Ericsson R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184050 SR - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 WI status report Ericsson LTE_bands_R15_M2_NB2-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184051 Discussion paper on the applicability of the tests in 37.571-1 for all types and categories of UE discussion

revised to R5-185551

Spirent Communications, European Commission R5-80

AI: 5.5.9

revised [WTS] [JSN]
R5-184052 Labelling more LTE test cases as not applicable for CAT M1 CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-2 15.2.0 CR#1184 catF TEI8_Test Rel-15 R5-80

AI: 6.4.4

withdrawn [WTS] [JSN]
R5-184053 Correction to EMM test case 9.2.3.1.25 CR

revised to R5-185008

ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.2.0 CR#4582 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.4

revised [WTS] [JSN]
R5-184054 Add SRB with NR PDCP CR Ericsson 36.508 15.2.0 CR#1177 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.

agreed [WTS] [JSN]
R5-184055 Add SRB1 and SRB2 with NR PDCP CR

revised to R5-185028

Ericsson 38.508-1 15.0.0 CR#2 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184056 Corrections to G.15.4 CR ROHDE & SCHWARZ, Qualcomm Incorporated 34.229-1 14.3.0 CR#1288 catF TEI11_Test, MTSI_WLAN-UEConTest Rel-14 R5-80

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-184057 Investigation on test coverage for IR.92 and IR.94 discussion ROHDE & SCHWARZ R5-80

AI: 6.5.6.5

noted [WTS] [JSN]
R5-184058 Investigation on Supplementary Services discussion ROHDE & SCHWARZ R5-80

AI: 6.5.6.5

noted [WTS] [JSN]
R5-184059 Adding SMS over IP configuration to applicabilities CR

revised to R5-185088

ROHDE & SCHWARZ 34.229-2 14.3.0 CR#247 catF TEI8_Test Rel-14 R5-80

AI: 6.5.6.2

revised [WTS] [JSN]
R5-184060 Adding SMS over SGs configuration to applicabilities CR ROHDE & SCHWARZ 36.523-2 15.2.0 CR#1185 catF TEI8_Test Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184061 Impact of GSMA IR.92 profile extension for EN-DC discussion ROHDE & SCHWARZ R5-80

AI: 6.3.13.19

noted [WTS] [JSN]
R5-184062 Resubmission of Corrections to IMS test case 19.1.6 CR ETSI MCC (Rohde & Schwarz) 34.229-1 14.3.0 CR#1289 catF TEI9_Test Rel-14 R5-80

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-184063 Resubmission of Correction to TC 8.1.5.7 CR ETSI MCC (MediaTek Inc.) 34.123-1 15.0.0 CR#3928 catF TEI_Test Rel-15 R5-80

AI: 6.5.4.1

agreed [WTS] [JSN]
R5-184064 Resubmission of a change of Cleaning up TC 6.5.2.4G.1 for V2V CR ETSI MCC (Huawei, Hisilicon) 36.521-1 15.2.0 CR#4335 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

withdrawn [WTS] [JSN]
R5-184065 Resubmission of Introduction of Maximum Power Reduction (MPR) for CA (3UL CA) CR ETSI MCC (SGS Wireless) 36.521-1 15.2.0 CR#4336 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

withdrawn [WTS] [JSN]
R5-184066 Resubmission of the Annexes of TC 6.5.2.3G.1 for V2V CR ETSI MCC (Huawei, Hisilicon) 36.521-1 15.2.0 CR#4337 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-184067 Correction to 10.7.4 regarding CE mode CR

revised to R5-185135

ROHDE & SCHWARZ 36.523-1 15.2.0 CR#4583 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.5

revised [WTS] [JSN]
R5-184068 FR1 TT Way Forward update discussion

revised to R5-185564

Telecom Italia S.p.A. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184069 Correction of the Update to applicability condition of test case 11.2.3 to include CSG PICS CR ETSI MCC (Qualcomm Incorporated) 36.523-2 15.2.0 CR#1186 catF TEI9_Test Rel-15 R5-80

AI: 6.4.4

withdrawn [WTS] [JSN]
R5-184070 MCC TF160 Status Report report

revised to R5-184999

MCC TF160 R5-80

AI: 2.1

revised [WTS] [JSN]
R5-184071 V2X: Test Model updates CR MCC TF160 36.523-3 15.0.0 CR#4252 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.5

agreed [WTS] [JSN]
R5-184072 EN-DC: TS 38.508-1 / 36.508 issue list discussion MCC TF160 R5-80

AI: 6.3.13.19

noted [WTS] [JSN]
R5-184073 EN-DC: Test Model updates CR

revised to R5-185156

MCC TF160 38.523-3 15.0.0 CR#1 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.6

revised [WTS] [JSN]
R5-184074 eLAA: Test Model CR MCC TF160 36.523-3 15.0.0 CR#4253 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 6.3.7.4

agreed [WTS] [JSN]
R5-184075 NB-IoT timer tolerances: extension of timer value range CR MCC TF160, Anritsu Ltd. 36.508 15.2.0 CR#1178 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.1

agreed [WTS] [JSN]
R5-184076 Corrections to UE Test Loop Mode H CR

revised to R5-185125

MCC TF160 36.509 13.6.0 CR#193 catF TEI13_Test, NB_IOT-UEConTest Rel-13 R5-80

AI: 6.4.2

revised [WTS] [JSN]
R5-184077 Corrections to UE Test Loop Mode H CR MCC TF160 36.509 14.4.0 CR#194 catA TEI13_Test, NB_IOT-UEConTest Rel-14 R5-80

AI: 6.4.2

agreed [WTS] [JSN]
R5-184078 Corrections to UE Test Loop Mode H CR MCC TF160 36.509 15.0.0 CR#195 catA TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.2

agreed [WTS] [JSN]
R5-184079 Clarification for NB-IoT test case 22.3.1.1 CR

revised to R5-185012

MCC TF160, Rohde&Schwarz 36.523-1 15.2.0 CR#4584 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

revised [WTS] [JSN]
R5-184080 Routine maintenance for TS 36.523-3 CR

revised to R5-185139

MCC TF160 36.523-3 15.0.0 CR#4254 catF TEI8_Test Rel-15 R5-80

AI: 6.4.5

revised [WTS] [JSN]
R5-184081 MCPTT: Test Model updates CR MCC TF160 36.579-5 13.0.0 CR#1 catF TEI13_Test, MCPTT-ConTest Rel-13 R5-80

AI: 6.5.9.5

agreed [WTS] [JSN]
R5-184082 Editorial clean up for consistency and better clarity CR Spirent Communications, European Commission 37.571-5 15.2.0 CR#183 catF TEI15_Test Rel-15 R5-80

AI: 5.5.11

withdrawn [WTS] [JSN]
R5-184083 Applicability of tests for types and Categories of UE CR

revised to R5-185552

Spirent Communications, European Commission 37.571-1 15.2.0 CR#267 catF TEI12_Test Rel-15 R5-80

AI: 5.5.9

revised [WTS] [JSN]
R5-184084 Update serving cell CR

revised to R5-185029

Ericsson 38.508-1 15.0.0 CR#3 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184085 TP to TS38.521-1:Operating bands and channel arrangement pCR

revised to R5-185321

China Unicom 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184086 Applicability and ICS for CA RF and RRM test cases CR Ericsson 36.521-2 15.2.0 CR#735 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.3

withdrawn [WTS] [JSN]
R5-184087 Update chapter 3 CR Ericsson 38.508-1 15.0.0 CR#4 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-184088 Correction to Rel-99 NAS testcase 9.4.9 CR ROHDE & SCHWARZ 34.123-1 15.0.0 CR#3929 catF TEI_Test Rel-15 R5-80

AI: 6.5.4.1

agreed [WTS] [JSN]
R5-184089 Correction to NB-IoT test case 22.5.8 CR

revised to R5-185013

ROHDE & SCHWARZ 36.523-1 15.2.0 CR#4585 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

revised [WTS] [JSN]
R5-184090 Correction to NB-IoT test case 22.5.14 CR

revised to R5-185014

ROHDE & SCHWARZ, Qualcomm 36.523-1 15.2.0 CR#4586 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

revised [WTS] [JSN]
R5-184091 Correction to NB-IoT test case 22.6.2 CR ROHDE & SCHWARZ 36.523-1 15.2.0 CR#4587 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-184092 Correction to NB-IoT test case 22.6.3 CR ROHDE & SCHWARZ 36.523-1 15.2.0 CR#4588 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-184093 Correction to NB-IoT test case 22.1.1 CR ROHDE & SCHWARZ 36.523-1 15.2.0 CR#4589 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-184094 Correction to ATTACH ACCEPT message for SMS only CR

revised to R5-185002

ROHDE & SCHWARZ 36.508 15.2.0 CR#1179 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.1

revised [WTS] [JSN]
R5-184095 Correction to eNB-IoT test case 22.3.2.7 CR

revised to R5-185114

MCC TF160 36.523-1 15.2.0 CR#4590 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

revised [WTS] [JSN]
R5-184096 Editorial corrections to IMS emergency call test cases in clauses 19 and 21 CR MCC TF160 34.229-1 14.3.0 CR#1290 catF TEI9_Test Rel-14 R5-80

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-184097 Introduce SA RRC messages CR

revised to R5-185030

Ericsson 38.508-1 15.0.0 CR#5 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184098 Update Clause in 6.2.5EA Configured UE transmitted Power for UE category M1 CR

revised to R5-185522

Qualcomm Incorporated 36.521-1 15.2.0 CR#4338 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 5.4.1.2

revised [WTS] [JSN]
R5-184099 Introduction of band 73 to UE maximum output power in TS36.521-1 CR China Unicom 36.521-1 15.2.0 CR#4339 catF LTE450_Reg3-UEConTest Rel-15 R5-80

AI: 5.3.22.3

agreed [WTS] [JSN]
R5-184100 Applicability correction for event triggered eMTC tests CR ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2214 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 5.4.1.4

withdrawn [WTS] [JSN]
R5-184101 Applicability correction for HO eMTC tests CR ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2215 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 5.4.1.4

withdrawn [WTS] [JSN]
R5-184102 Editorial corrections 8.16.73 CR ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2216 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-184103 Editorial corrections 9.1.46 CR

revised to R5-185483

ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2217 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

revised [WTS] [JSN]
R5-184104 Editorial corrections 9.1.50 CR

revised to R5-185484

ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2218 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

revised [WTS] [JSN]
R5-184105 Editorial corrections 7.3.49 CR ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2219 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184106 RMC correction 8.1.12_1 (core spec alignment) CR ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2220 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184107 New generic CA RSRP test cases CR ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2221 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-184108 New generic CA RSRQ test cases CR ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2222 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-184109 Applicability correction for eMTC tests CR ROHDE & SCHWARZ 36.521-2 15.2.0 CR#736 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 5.4.1.3

withdrawn [WTS] [JSN]
R5-184110 Correction to NB-IOT In-Band Test Frequencies CR ROHDE & SCHWARZ 36.508 15.2.0 CR#1180 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.1

agreed [WTS] [JSN]
R5-184111 Addition of NB-IOT Guardband Test Frequencies for 10 MHz CR

revised to R5-185409

ROHDE & SCHWARZ 36.508 15.2.0 CR#1181 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.1

revised [WTS] [JSN]
R5-184112 Correction to nrs-CRS-PowerOffset-r13 for NB-IOT OTDOA tests CR

revised to R5-185416

ROHDE & SCHWARZ 37.571-1 15.2.0 CR#268 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.6

revised [WTS] [JSN]
R5-184113 NB-IOT OTDOA reporting delay test cases not testable CR

revised to R5-185417

ROHDE & SCHWARZ 37.571-1 15.2.0 CR#269 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.6

revised [WTS] [JSN]
R5-184114 Changes to eMTC OTDOA tests CR

revised to R5-185419

ROHDE & SCHWARZ 37.571-1 15.2.0 CR#270 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.5

revised [WTS] [JSN]
R5-184115 Draft TS 38.533 v0.0.2 draft TS ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-184116 LS on generic 3CC to 5CC RRM test cases LS out

LS To: GCF SG, PTCRB PVG

ROHDE & SCHWARZ LTE_CA_Rel13-UEConTest R5-80

AI: 5.6

approved [WTS] [JSN]
R5-184117 New CA band combination CA_1A-3A-7A-20A - Update of table 7.3A.5, 7.3A.9 and refsens CR

revised to R5-185343

Vodafone GmbH 36.521-1 15.2.0 CR#4340 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

revised [WTS] [JSN]
R5-184118 New CA band combination CA_1A-3A-7A-20A - Update of table A.4.6.3-5 CR

revised to R5-185344

Vodafone GmbH 36.521-2 15.2.0 CR#737 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.3

revised [WTS] [JSN]
R5-184119 New CA band combination CA_1A-3A-7A-20A - Update of table A.4.3.3.3-5 CR

revised to R5-185140

Vodafone GmbH 36.523-2 15.2.0 CR#1187 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 6.3.4.3

revised [WTS] [JSN]
R5-184120 New CA band combination CA_1A-3A-7A-20A - Update of test point analysis CR

revised to R5-185345

Vodafone GmbH 36.905 15.1.0 CR#141 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.

revised [WTS] [JSN]
R5-184121 TP for Clause 4.1.1 of TS 38.522 pCR

revised to R5-185209

CMCC 38.522 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.8

revised [WTS] [JSN]
R5-184122 TP for Clause 4.1.2 of TS 38.522 pCR

revised to R5-185210

CMCC 38.522 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.8

revised [WTS] [JSN]
R5-184123 TP for Clause 4.1.3 of TS 38.522 pCR

revised to R5-185211

CMCC 38.522 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.8

revised [WTS] [JSN]
R5-184124 Discussion on the way to write Clause 7.4 Maximum Input Level and Clause 7.5 Adjacent Channel Selectivity in TS 38.521-3 discussion

revised to R5-185328

CMCC, HUAWEI Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184125 Add Clause 7.5 into TS 38.521-3 pCR

revised to R5-185329

CMCC 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184126 Correct IE FrequencyInfoDL CR

revised to R5-185031

Ericsson 38.508-1 15.0.0 CR#6 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184127 Introduce SA system information blocks CR

revised to R5-185032

Ericsson 38.508-1 15.0.0 CR#7 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184128 Discussion on Test Loop Mode H discussion MCC TF160 R5-80

AI: 6.4.6

noted [WTS] [JSN]
R5-184129 Editorial Correction to note 7 in Table E-1 CR ROHDE & SCHWARZ 36.521-3 15.2.1 CR#2223 catF TEI12_Test Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184130 Introduction of band 73 to Spurious emission in TS36.521-1 CR China Unicom 36.521-1 15.2.0 CR#4341 catF LTE450_Reg3-UEConTest Rel-15 R5-80

AI: 5.3.22.3

agreed [WTS] [JSN]
R5-184131 Addition of Assistance Data for OTDOA eMTC tests CR

revised to R5-185420

ROHDE & SCHWARZ 37.571-5 15.2.0 CR#184 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.7

revised [WTS] [JSN]
R5-184132 Correction of the applicability for OTDOA IOT tests CR

revised to R5-185418

ROHDE & SCHWARZ 37.571-3 15.2.0 CR#97 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.7

revised [WTS] [JSN]
R5-184133 Discussion on RRM 5G progress discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184134 Introduce SA other information elements CR

revised to R5-185033

Ericsson 38.508-1 15.0.0 CR#8 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184135 eNB-IoT: Test Model CR MCC TF160 36.523-3 15.0.0 CR#4259 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.5

agreed [WTS] [JSN]
R5-184136 Removal of technical content in 34.108 v14.2.0 and substitution with pointer to the next Release CR ETSI Secretariat 34.108 14.2.0 CR#1001 catF TEI14_Test Rel-14 R5-80

AI: 7.1

agreed [WTS] [JSN]
R5-184137 Removal of technical content in 34.121-2 v14.1.0 and substitution with pointer to the next Release CR ETSI Secretariat 34.121-2 14.1.0 CR#177 catF TEI14_Test Rel-14 R5-80

AI: 7.1

agreed [WTS] [JSN]
R5-184138 Removal of technical content in 34.123-1 v14.5.0 and substitution with pointer to the next Release CR ETSI Secretariat 34.123-1 14.5.0 CR#3930 catF TEI14_Test Rel-14 R5-80

AI: 7.1

agreed [WTS] [JSN]
R5-184139 Removal of technical content in 34.123-2 v14.4.0 and substitution with pointer to the next Release CR ETSI Secretariat 34.123-2 14.4.0 CR#790 catF TEI14_Test Rel-14 R5-80

AI: 7.1

agreed [WTS] [JSN]
R5-184140 Removal of technical content in 36.521-3 v14.4.0 and substitution with pointer to the next Release CR ETSI Secretariat 36.521-3 14.4.0 CR#2224 catF TEI14_Test Rel-14 R5-80

AI: 7.1

agreed [WTS] [JSN]
R5-184141 Removal of technical content in 36.523-3 v14.4.0 and substitution with pointer to the next Release CR ETSI Secretariat 36.523-3 14.4.0 CR#4260 catF TEI14_Test Rel-14 R5-80

AI: 7.1

agreed [WTS] [JSN]
R5-184142 Removal of technical content in 36.903 v13.5.0 and substitution with pointer to the next Release CR ETSI Secretariat 36.903 13.5.0 CR#382 catF TEI13_Test Rel-13 R5-80

AI: 7.1

agreed [WTS] [JSN]
R5-184143 Removal of technical content in 36.905 v14.6.0 and substitution with pointer to the next Release CR ETSI Secretariat 36.905 14.6.0 CR#142 catF TEI14_Test Rel-14 R5-80

AI: 7.1

agreed [WTS] [JSN]
R5-184144 Correction to test case 9.5.7.2 CR Intel Corporation (UK) Ltd, Rohde & Schwarz 34.123-1 15.0.0 CR#3931 catF TEI_Test Rel-15 R5-80

AI: 6.5.4.1

agreed [WTS] [JSN]
R5-184145 Addition of Test Case:” LWA / T351 Expiry” to WLAN/3GPP Radio Level Integration and Interworking Enhancement Interworking Work Item CR

revised to R5-185105

Intel Corporation (UK) Ltd 36.523-1 15.2.0 CR#4591 catF LTE_WLAN_radio-UEConTest Rel-15 R5-80

AI: 6.3.3.2

revised [WTS] [JSN]
R5-184146 Addition of Applicability statement for WLAN/3GPP Radio Level Integration and Interworking Enhancement test case: ”LWA / T351 Expiry” CR Intel Corporation (UK) Ltd 36.523-2 15.2.0 CR#1188 catF LTE_WLAN_radio-UEConTest Rel-15 R5-80

AI: 6.3.3.3

agreed [WTS] [JSN]
R5-184147 Test Tolerance Analysis for RRM TC 9.1.1.1_2 and 9.1.2.1_2 CR

revised to R5-185395

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#383 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184148 Addition of TT analysis of eHST FDD Intra-frequency event reporting. CR

revised to R5-185424

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#384 catF LTE_high_speed-UEConTest Rel-14 R5-80

AI: 5.3.9.5

revised [WTS] [JSN]
R5-184149 Addition of TT analysis of V2X uplink timing test case CR

revised to R5-185425

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#385 catF LTE_V2X-UEConTest Rel-14 R5-80

AI: 5.3.12.6

revised [WTS] [JSN]
R5-184150 Test tolerance update of V2X uplink timing test cases CR

revised to R5-185554

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#2225 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

revised [WTS] [JSN]
R5-184151 Test tolerance update of eHST FDD event reporting test case CR Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#2226 catF LTE_high_speed-UEConTest Rel-15 R5-80

AI: 5.3.9.4

agreed [WTS] [JSN]
R5-184152 TP to TS8.521-1: Operating bands and Channel arrangement pCR China Unicom 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

withdrawn [WTS] [JSN]
R5-184153 Draft TS 38.521-1 v1.0.1 draft TS China Unicom 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

withdrawn [WTS] [JSN]
R5-184154 Draft TS 38.521-1 v1.0.1 draft TS China Unicom 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-184155 Test Tolerance Analysis for RRM TC 9.1.1.2_2 and 9.1.2.2_2 CR

revised to R5-185396

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#386 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184156 Test Tolerance Analysis for RRM TC 9.1.3.1_2 and 9.1.4.1_2 CR

revised to R5-185397

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#387 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184157 Test Tolerance Analysis for RRM TC 9.1.3.2_2 and 9.1.4.2_2 CR

revised to R5-185398

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#388 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184158 Test Tolerance Analysis for RRM TC 9.1.5.1_2 CR

revised to R5-185399

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#389 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184159 Test Tolerance Analysis for RRM TC 9.1.5.2_2 CR

revised to R5-185400

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#390 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184160 Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 CR Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#391 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.8

withdrawn [WTS] [JSN]
R5-184161 Test Tolerance Analysis for RRM TC 9.2.3.1_2 and 9.2.4.1_2 CR

revised to R5-185401

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#392 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184162 Test Tolerance Analysis for RRM TC 9.2.3.2_2 and 9.2.4.2_2 CR

revised to R5-185402

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#393 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184163 Test Tolerance Analysis for RRM TC 9.2.4A.1_2 CR

revised to R5-185403

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#394 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184164 Test Tolerance Analysis for RRM TC 9.2.4A.2_2 CR

revised to R5-185404

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#395 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184165 Test Tolerance: Updates to Cat1bis inter frequency RSRP accuracy tests and Annex F CR

revised to R5-185391

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#2227 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

revised [WTS] [JSN]
R5-184166 Test Tolerance: Updates to Cat1bis inter frequency RSRQ accuracy tests and Annex F CR

revised to R5-185392

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#2228 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

revised [WTS] [JSN]
R5-184167 Test Tolerance: Updates to Cat1bis intra frequency RSRP accuracy tests and Annex F CR

revised to R5-185393

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#2229 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

revised [WTS] [JSN]
R5-184168 Test Tolerance: Updates to Cat1bis intra frequency RSRQ accuracy tests and Annex F CR

revised to R5-185394

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#2230 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

revised [WTS] [JSN]
R5-184169 Update of RRM IncMon test cases 8.3.7, 8.3.8, 8.3.9, 8.4.7 including test tolerances CR

revised to R5-185485

Ericsson 36.521-3 15.2.1 CR#2231 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184170 Requirements for test frequencies for 5G signalling test cases discussion MCC TF160 R5-80

AI: 6.3.13.19

noted [WTS] [JSN]
R5-184171 TC Group definition for RRM IncMon test cases CR

revised to R5-185456

Ericsson 36.903 14.1.0 CR#396 catF LTE_UTRA_IncMon-UEConTest Rel-14 R5-80

AI: 5.3.1.7

revised [WTS] [JSN]
R5-184172 Add Test Tolerances analysis for E-UTRAN RRM IncMon TCs 8.3.7 and 8.4.7 CR Ericsson 36.903 14.1.0 CR#397 catF LTE_UTRA_IncMon-UEConTest Rel-14 R5-80

AI: 5.3.1.7

agreed [WTS] [JSN]
R5-184173 Add Test Tolerances analysis for E-UTRAN IncMon TC 8.3.8 CR Ericsson 36.903 14.1.0 CR#398 catF LTE_UTRA_IncMon-UEConTest Rel-14 R5-80

AI: 5.3.1.7

agreed [WTS] [JSN]
R5-184174 Add Test Tolerances analysis for E-UTRAN IncMon TC 8.3.9 CR Ericsson 36.903 14.1.0 CR#399 catF LTE_UTRA_IncMon-UEConTest Rel-14 R5-80

AI: 5.3.1.7

agreed [WTS] [JSN]
R5-184175 Correction to NR MAC test case 7.1.1.3.2 CR

revised to R5-185059

Keysight Technologies UK Ltd 38.523-1 15.0.0 CR#1 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184176 Updates to PDCCH and SearchSpace configurations CR

revised to R5-185034

MCC TF160 38.508-1 15.0.0 CR#9 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184177 Updation of V2X TC 6.6.2.1G.2 & 6.6.2.1G.3 CR Huawei, Hisilicon 36.521-1 15.2.0 CR#4342 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-184178 Introcution of V2X TC 6.5.2.4G.3 CR

revised to R5-185438

Huawei, Hisilicon 36.521-1 15.2.0 CR#4343 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184179 Updation of V2X TC 6.6.2.2G.2 CR

revised to R5-185439

Huawei, Hisilicon 36.521-1 15.2.0 CR#4344 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184180 Updation of V2X TCs 6.5.2.3G.2 and 6.5.2.3G.3 CR

revised to R5-185440

Huawei, Hisilicon 36.521-1 15.2.0 CR#4345 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184181 Update of V2V TCs 6.5.2.3G.1 & 6.5.2.4G & 6.6.2.2G.1& 6.6.3G.1 CR

revised to R5-185354

Huawei, Hisilicon 36.521-1 15.2.0 CR#4346 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

revised [WTS] [JSN]
R5-184182 TT statements for V2X TCs CR

revised to R5-185441

Huawei, Hisilicon 36.521-1 15.2.0 CR#4347 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184183 Update of V2X TCs 6.6.3G.2_1 & 6.6.3G.3_1 CR

revised to R5-185360

Huawei, Hisilicon 36.521-1 15.2.0 CR#4348 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184184 Update of V2X TCs 6.6.3G.2 & 6.6.3G.3 CR

revised to R5-185361

Huawei, Hisilicon 36.521-1 15.2.0 CR#4349 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184185 Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 CR

revised to R5-185405

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#400 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184186 Proposal for Signalling Test Setup in FR2 CR ANRITSU LTD 38.508-1 15.0.0 CR#10 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

withdrawn [WTS] [JSN]
R5-184187 Correction to testcase 9.2.2.1.9 for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-3 15.0.0 CR#4262 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 6.4.3.4

withdrawn [WTS] [JSN]
R5-184188 Reuse of demodulation setup for signalling tests in FR2 discussion

revised to R5-185131

ANRITSU LTD 5GS_NR_LTE-UEConTest R5-80

AI: 4.5.2

revised [WTS] [JSN]
R5-184189 Band groups added to specification CR PCTEST Engineering Laboratory, Inc. 37.571-1 15.2.0 CR#271 catF TEI14_Test Rel-15 R5-80

AI: 5.5.9

agreed [WTS] [JSN]
R5-184190 Editorial - Updates for GNSS Signal Capabilities CR PCTEST Engineering Laboratory, Inc. 37.571-3 15.2.0 CR#98 catF TEI15_Test Rel-15 R5-80

AI: 5.5.

agreed [WTS] [JSN]
R5-184191 Editorial - Updates, corrections and clarifications to specification CR PCTEST Engineering Laboratory, Inc. 37.571-5 15.2.0 CR#185 catF TEI15_Test Rel-15 R5-80

AI: 5.5.11

agreed [WTS] [JSN]
R5-184192 Correction of Test Cases 8.2.5.4 and 8.2.5.5 CR

revised to R5-185106

Intel Corporation (UK) Ltd 36.523-1 15.2.0 CR#4592 catF LTE_WLAN_radio-UEConTest Rel-15 R5-80

AI: 6.3.3.2

revised [WTS] [JSN]
R5-184193 Correction to 36521-1-chapter 6_V2V and V2X CR

revised to R5-185362

Tejet 36.521-1 15.2.0 CR#4350 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184194 eLAA_correction to 6.3.5A.1.2 and 6.3.5A.2.2 CR

revised to R5-185431

Tejet 36.521-1 15.2.0 CR#4351 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 5.3.7.2

revised [WTS] [JSN]
R5-184195 eLAA_Update to 6.6.2.3A.2 CR Tejet 36.521-1 15.2.0 CR#4352 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 5.3.7.2

withdrawn [WTS] [JSN]
R5-184196 eLAA_Update to 6.6.3.1A.2 CR

revised to R5-185432

Tejet 36.521-1 15.2.0 CR#4353 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 5.3.7.2

revised [WTS] [JSN]
R5-184197 CA band combination CA_2A-46A CA_26A-46A - Updates of test points analysis CR Tejet 36.905 15.1.0 CR#143 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 5.3.7.5

agreed [WTS] [JSN]
R5-184198 WP - UE Conformance Test Aspects - Voice and Video Enhancement for LTE Work Plan CATT LTE_VoLTE_ViLTE_enh-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184199 SR - UE Conformance Test Aspects - Voice and Video Enhancement for LTE WI status report CATT LTE_VoLTE_ViLTE_enh-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184200 WP - UE Conformance Test Aspects - UL Data Compression in LTE Work Plan CATT LTE_UDC-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184201 SR - UE Conformance Test Aspects - UL Data Compression in LTE WI status report CATT LTE_UDC-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184202 Completion of Chapter 7 RRM cat 1bis test cases CR

revised to R5-185386

Qualcomm UK Ltd 36.521-3 15.2.1 CR#2232 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

revised [WTS] [JSN]
R5-184203 Test Tolerance: Updates to Cat1bis chapter 8 inter-frequency event triggered reporting tests CR Qualcomm UK Ltd 36.521-3 15.2.1 CR#2233 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184204 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis CR Qualcomm UK Ltd 36.903 14.1.0 CR#401 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.8

withdrawn [WTS] [JSN]
R5-184205 Test Tolerance: Updates to Cat1bis Event triggered reporting tests under AWGN propagation conditions in asynchronous cells with DRX when L3 filtering is used CR Qualcomm UK Ltd 36.521-3 15.2.1 CR#2234 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184206 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used CR Qualcomm UK Ltd 36.903 14.1.0 CR#402 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.8

withdrawn [WTS] [JSN]
R5-184207 Test Tolerance: Updates to Cat1bis Event triggered reporting tests with fading, Annex E and Annex F CR Qualcomm UK Ltd 36.521-3 15.2.1 CR#2235 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184208 Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis CR Qualcomm UK Ltd 36.903 14.1.0 CR#403 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.8

withdrawn [WTS] [JSN]
R5-184209 Test Tolerance: Updates to Cat1bis intra-frequency Event triggered reporting tests, Annex E and Annex F CR Qualcomm UK Ltd 36.521-3 15.2.1 CR#2236 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184210 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis CR Qualcomm UK Ltd 36.903 14.1.0 CR#404 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.8

withdrawn [WTS] [JSN]
R5-184211 Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F CR

revised to R5-185337

Qualcomm UK Ltd 36.521-3 15.2.1 CR#2237 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

revised [WTS] [JSN]
R5-184212 Test Tolerances analysis for E-UTRAN FDD and TDD Intra-frequency CGI TC 8.1.19_2, 8.1.20_2, 8.2.7_2, 8.2.8_2 for UE category 1bis CR Qualcomm UK Ltd 36.903 14.1.0 CR#405 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.8

withdrawn [WTS] [JSN]
R5-184213 Removal of Testcase 8.2.2.6.4 CR CATT 36.523-1 15.2.0 CR#4593 catF LTE_VoLTE_ViLTE_enh-UEConTest Rel-15 R5-80

AI: 6.3.14.5

agreed [WTS] [JSN]
R5-184214 Removal of Testcase 8.2.2.6.5 CR CATT 36.523-1 15.2.0 CR#4594 catF LTE_VoLTE_ViLTE_enh-UEConTest Rel-15 R5-80

AI: 6.3.14.5

agreed [WTS] [JSN]
R5-184215 Update of the title of Testcase 7.1.5.6 CR CATT 36.523-1 15.2.0 CR#4595 catF LTE_VoLTE_ViLTE_enh-UEConTest Rel-15 R5-80

AI: 6.3.14.5

withdrawn [WTS] [JSN]
R5-184216 Corrections to NBIOT NAS TC 22.5.7b CR

revised to R5-185015

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#4640 catF NB_IOT-UEConTest, TEI13_Test Rel-15 R5-80

AI: 6.4.3.11

revised [WTS] [JSN]
R5-184217 Update of applicability and tests conditions for LTE_VoLTE_ViLTE_enh test cases CR CATT 36.523-2 15.2.0 CR#1189 catF LTE_VoLTE_ViLTE_enh-UEConTest Rel-15 R5-80

AI: 6.3.14.6

agreed [WTS] [JSN]
R5-184218 Addition of Correct HARQ process handling BCCH test case 7.1.1.2.4 CR Huawei, Hisilicon 38.523-1 15.0.0 CR#2 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-184219 Addition of Correct HARQ process handling CCCH test case 7.1.1.2.3 CR Huawei, Hisilicon 38.523-1 15.0.0 CR#3 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-184220 Addition of Correct Handling of DL HARQ process PDSCH Aggregation test case 7.1.1.2.2 CR

revised to R5-185060

Huawei, Hisilicon 38.523-1 15.0.0 CR#4 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184221 Addition of NR CA reconfiguration test case 8.2.4.2.1.1 CR

revised to R5-185061

Huawei, Hisilicon 38.523-1 15.0.0 CR#5 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184222 Addition of NR CA reconfiguration test case 8.2.4.2.1.2 CR

revised to R5-185062

Huawei, Hisilicon 38.523-1 15.0.0 CR#6 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184223 Addition of NR CA reconfiguration test case 8.2.4.2.1.3 CR

revised to R5-185148

Huawei, Hisilicon 38.523-1 15.0.0 CR#7 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184224 Addition of Random access procedure Successful Supplementary Uplink test case 7.1.1.1.5 CR Huawei, Hisilicon 38.523-1 15.0.0 CR#8 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-184225 Addition of Random access test case 7.1.1.1.4 CR

revised to R5-185063

Huawei, Hisilicon 38.523-1 15.0.0 CR#9 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184226 Addition of Correct handling of Configured UL grant Type 1 test case 7.1.1.6.2 CR Huawei, Hisilicon 38.523-1 15.0.0 CR#10 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184227 Addition of Correct handling of Configured UL grant Type 2 test case 7.1.1.6.3 CR Huawei, Hisilicon 38.523-1 15.0.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184228 CR of Correct handling of DL assignment Semi persistent test case 7.1.1.6.1 CR Huawei, Hisilicon 38.523-1 15.0.0 CR#12 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184229 CR of UE power headroom reporting test case 7.1.1.3.7 CR Huawei, Hisilicon 38.523-1 15.0.0 CR#13 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184230 CR of BSR report test case 7.1.1.3.4 CR Huawei, Hisilicon 38.523-1 15.0.0 CR#14 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-184231 Addition and correction of test applicability of multiple signalling test cases CR Huawei, Hisilicon 38.523-2 15.0.0 CR#1 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.5

withdrawn [WTS] [JSN]
R5-184232 Discussion on CQI reporting on highest MCS value case discussion Huawei, Hisilicon TEI8_Test Rel-15 R5-80

AI: 5.4.1.11

noted [WTS] [JSN]
R5-184233 CR of CQI reporting test case 9.2.1.1.4.2 CR

revised to R5-185537

Huawei, Hisilicon 36.521-1 15.2.0 CR#4354 catF TEI8_Test Rel-15 R5-80

AI: 5.4.1.2.3

revised [WTS] [JSN]
R5-184234 Correction to message contents for UL64QAM CR Anritsu 36.508 15.2.0 CR#1182 catF TEI13_Test, LTE_UL64QAM-UEConTest Rel-15 R5-80

AI: 5.4.1.1

agreed [WTS] [JSN]
R5-184235 Correction to default message for UL CA tests CR Anritsu 36.508 15.2.0 CR#1183 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-80

AI: 5.4.1.1

agreed [WTS] [JSN]
R5-184236 Editorial correction to FDD Mode test frequencies CR Anritsu 36.508 15.2.0 CR#1184 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.1

agreed [WTS] [JSN]
R5-184237 Correction to Figure A.64 to cater for CC >= 3 CR

revised to R5-185449

Anritsu 36.508 15.2.0 CR#1185 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.1

revised [WTS] [JSN]
R5-184238 Correction to LAA CQI reporting tests CR Anritsu 36.521-1 15.2.0 CR#4355 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-80

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-184239 Correction to 4x4 CA demodulation tests CR

revised to R5-185375

Anritsu 36.521-1 15.2.0 CR#4356 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.2

revised [WTS] [JSN]
R5-184240 Correction to cqi-pmi-ConfigurationIndex for 5DL CA CQI Reporting tests CR Anritsu 36.521-1 15.2.0 CR#4357 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184241 Correction to message exception for 8.2.1.4.2_A.4 CR

revised to R5-185450

Anritsu 36.521-1 15.2.0 CR#4358 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184242 Correction to p-Max in configured UE transmitted output power tests for CA CR Anritsu 36.521-1 15.2.0 CR#4359 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-80

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-184243 Removal of the editor’s note regarding the faders in 4x4 CA demod tests CR Anritsu 36.521-1 15.2.0 CR#4360 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.2

agreed [WTS] [JSN]
R5-184244 Editorial correction to inter-band UL CA tests CR Anritsu 36.521-1 15.2.0 CR#4361 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-80

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-184245 Editorial correction to RMC name in PHICH demodulation test CR

revised to R5-185451

Anritsu 36.521-1 15.2.0 CR#4362 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.2.3

revised [WTS] [JSN]
R5-184246 Editorial correction to test points for 8.7.5.1 CR Anritsu 36.521-1 15.2.0 CR#4363 catF TEI12_Test Rel-15 R5-80

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-184247 Correction to 4CA and 5CA PDSCH demodulation tests CR Anritsu 36.521-1 15.2.0 CR#4364 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184248 Corrections to CA Test Configuration Table in section 7 CR

revised to R5-185452

Anritsu 36.521-1 15.2.0 CR#4365 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184249 Editorial correction to Table 6.2.5.3-3 Delta TIB (three bands) CR Anritsu 36.521-1 15.2.0 CR#4366 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-184250 Correction to Test Tolerance for 4DL and 5DL Reference Sensitivity Test CR Anritsu 36.521-1 15.2.0 CR#4367 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184251 Editorial correction to 6.6.3.3 CR Anritsu 36.521-1 15.2.0 CR#4368 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.2.1

withdrawn [WTS] [JSN]
R5-184252 Correction of connection diagram for 4Rx 3CC/4CC/5CC Rx tests CR Anritsu 36.521-1 15.2.0 CR#4369 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184253 Clarify the definition of active time slot in out of band and spurious emission tests CR Anritsu 36.521-1 15.2.0 CR#4370 catF TEI8_Test Rel-15 R5-80

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-184254 Editorial correction to test points for CA_2A-12A-66A in 7.3A.5 CR Anritsu 36.521-1 15.2.0 CR#4371 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184255 Editorial correction to Reference NPRACH Configuration CR Anritsu 36.521-3 15.2.1 CR#2238 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184256 Correction to 5CA FDD-TDD Chapter 8 Tests CR Anritsu 36.521-3 15.2.1 CR#2239 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-184257 Correction to LAA CSI-RS measurement test CR Anritsu 36.521-3 15.2.1 CR#2240 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-80

AI: 5.4.1.4

withdrawn [WTS] [JSN]
R5-184258 Editorial correction to LAA Listen-before-talk model CR Anritsu 36.521-3 15.2.1 CR#2241 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184259 Correction to connection figure for 4 DL and 5 DL CA Event Triggered Reporting tests CR Anritsu 36.521-3 15.2.1 CR#2242 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-184260 Correction to cell configuration mapping table for 8.16.70 and 8.16.78 CR Anritsu 36.521-3 15.2.1 CR#2243 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-184261 Correction to cell configuration mapping for 8.26.3 CR Anritsu 36.521-3 15.2.1 CR#2244 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184262 Correction to test procedure for FS3 event triggered reporting tests CR Anritsu 36.521-3 15.2.1 CR#2245 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184263 Correction to test requirement of FS3 event triggered reporting tests CR Anritsu 36.521-3 15.2.1 CR#2246 catF TEI13_Test, LTE_LAA-UEConTest Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184264 Correction to minimum conformance requirements for FDD_B1 and FDD_B2 CR Anritsu 36.521-3 15.2.1 CR#2247 catF LTE_FDD_L_band-UEConTest Rel-15 R5-80

AI: 5.3.18.5

agreed [WTS] [JSN]
R5-184265 Editorial correction to Noc for Cell2 on FDD_B1 or FDD_B2 CR Anritsu 36.521-3 15.2.1 CR#2248 catF TEI12_Test Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184266 Correction of test case title of 8.2.2.5a.2 CR Huawei,HiSilicon 36.523-2 15.2.0 CR#1190 catF TEI14_Test, LTE_SRS_switch-UEConTest Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184267 Cleaning up V2X test cases in TS 36.521-1 CR

revised to R5-185363

Huawei,HiSilicon 36.521-1 15.2.0 CR#4372 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184268 Cleaning up the default message contents and test states of V2X CR Huawei,HiSilicon 36.508 15.2.0 CR#1186 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.1

agreed [WTS] [JSN]
R5-184269 Addition of test applicabilities of multiple V2X test cases CR

revised to R5-185374

Huawei,HiSilicon 36.521-2 15.2.0 CR#738 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.4

revised [WTS] [JSN]
R5-184270 Addition of TT analysis of V2X TC 12.2.1 CR Huawei,HiSilicon, Anritsu, Rohde & Schwarz 36.903 14.1.0 CR#406 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.6

withdrawn [WTS] [JSN]
R5-184271 Addition of TT analysis of V2X TC 12.2.2 CR Huawei,HiSilicon, Anritsu, Rohde & Schwarz 36.903 14.1.0 CR#407 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.6

withdrawn [WTS] [JSN]
R5-184272 Addition of TT analysis of V2X TC 12.4 CR Huawei,HiSilicon, Anritsu, Rohde & Schwarz 36.903 14.1.0 CR#408 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.6

withdrawn [WTS] [JSN]
R5-184273 Addition of V2X new TC 12.2.1 CR Huawei,HiSilicon, Rohde & Schwarz 36.521-3 15.2.1 CR#2249 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-184274 Addition of V2X new TC 12.2.2 CR

revised to R5-185184

Huawei,HiSilicon, Rohde & Schwarz 36.521-3 15.2.1 CR#2250 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

revised [WTS] [JSN]
R5-184275 Addition of V2X new TC 12.4 CR Huawei,HiSilicon, Rohde & Schwarz 36.521-3 15.2.1 CR#2251 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

withdrawn [WTS] [JSN]
R5-184276 Update of Annex F for TC 12.2.1, 12.2.2 and 12.4 CR Huawei,HiSilicon, Anritsu, Rohde & Schwarz 36.521-3 15.2.1 CR#2252 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-184277 Update of TP analysis of CA_3A-7A-8A CR Huawei,HiSilicon 36.905 15.1.0 CR#144 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.

agreed [WTS] [JSN]
R5-184278 Addition of TP analysis of CA_1A-7A-8A in 36.905 CR Huawei,HiSilicon 36.905 15.1.0 CR#145 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.

agreed [WTS] [JSN]
R5-184279 Addition of TP analysis of CA_1A-3A-7A-8A in 36.905 CR Huawei,HiSilicon 36.905 15.1.0 CR#146 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.

agreed [WTS] [JSN]
R5-184280 Addition of TP analysis of CA_7A-42A-42A in 36.905 CR Huawei,HiSilicon 36.905 15.1.0 CR#147 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.

agreed [WTS] [JSN]
R5-184281 Addition of TP analysis of CA_20A-42A-42A in 36.905 CR Huawei,HiSilicon 36.905 15.1.0 CR#148 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.

agreed [WTS] [JSN]
R5-184282 Update of test frequencies for CA_42A-42A CR Huawei,HiSilicon 36.508 15.2.0 CR#1187 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.1

agreed [WTS] [JSN]
R5-184283 Correction of test configuration of CA_20A-42A REFSENS CR

revised to R5-185493

Huawei,HiSilicon 36.521-1 15.2.0 CR#4373 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184284 Update of 7.3A.5 REFSENS for Rel-13 CA configurations CR

revised to R5-185494

Huawei,HiSilicon 36.521-1 15.2.0 CR#4374 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184285 Addition of REFSENS test configuration of CA_1A-3A-7A-8A CR Huawei,HiSilicon 36.521-1 15.2.0 CR#4375 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184286 Addition of multiple CA configurations to capability tables in TS 36.521-2 CR Huawei,HiSilicon 36.521-2 15.2.0 CR#739 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.3

withdrawn [WTS] [JSN]
R5-184287 Addition of multiple CA configurations to capability tables in TS 36.523-2 CR Huawei,HiSilicon 36.523-2 15.2.0 CR#1191 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 6.3.2.3

agreed [WTS] [JSN]
R5-184288 Editorial cleaning up of Rel-14 CA 5DL RSRP measurement TC 9.1.51 CR

revised to R5-185342

Huawei,HiSilicon 36.521-3 15.2.1 CR#2253 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.4

revised [WTS] [JSN]
R5-184289 Addition of Rel-13 B5C new TC 8.16.47 CR Huawei,HiSilicon, Bureau Veritas 36.521-3 15.2.1 CR#2254 catF LTE_CA_enh_b5C_PUCCH-UEConTest Rel-15 R5-80

AI: 5.3.6.3

agreed [WTS] [JSN]
R5-184290 Addition of Rel-13 B5C new TC 8.16.48 CR Huawei,HiSilicon, Bureau Veritas 36.521-3 15.2.1 CR#2255 catF LTE_CA_enh_b5C_PUCCH-UEConTest Rel-15 R5-80

AI: 5.3.6.3

agreed [WTS] [JSN]
R5-184291 Addition of Rel-13 B5C new TC 8.16.49 CR Huawei,HiSilicon, Bureau Veritas 36.521-3 15.2.1 CR#2256 catF LTE_CA_enh_b5C_PUCCH-UEConTest Rel-15 R5-80

AI: 5.3.6.3

agreed [WTS] [JSN]
R5-184292 Addition of Rel-13 B5C new TC 8.16.50 CR Huawei,HiSilicon, Bureau Veritas 36.521-3 15.2.1 CR#2257 catF LTE_CA_enh_b5C_PUCCH-UEConTest Rel-15 R5-80

AI: 5.3.6.3

agreed [WTS] [JSN]
R5-184293 Update of Annex E and Annex F to add cell mapping and TT for 8.16.47-50 CR Huawei,HiSilicon 36.521-3 15.2.1 CR#2258 catF LTE_CA_enh_b5C_PUCCH-UEConTest Rel-15 R5-80

AI: 5.3.6.3

agreed [WTS] [JSN]
R5-184294 Addition of test applicability for Rel-13 B5C new TC 8.16.47-50 CR Huawei,HiSilicon 36.521-2 15.2.0 CR#740 catF LTE_CA_enh_b5C_PUCCH-UEConTest Rel-15 R5-80

AI: 5.3.6.2

agreed [WTS] [JSN]
R5-184295 Discussion on test frequency definition in FR1 discussion Huawei,HiSilicon 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184296 Update of test frequencies of Band n41 and n77 CR Huawei,HiSilicon 38.508-1 15.0.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

withdrawn [WTS] [JSN]
R5-184297 Addition of Mid channel bandwidth definition for several missing bands CR Huawei,HiSilicon 38.508-1 15.0.0 CR#12 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184298 Update of common uplink configuration in 6.1 pCR Huawei,HiSilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-184299 Update of FR1 test case 6.2.1 pCR

revised to R5-185305

Huawei,HiSilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184300 Addition of FR1 test case 6.2.4 pCR

revised to R5-185322

Huawei,HiSilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184301 Update of FR1 test case 6.3.1 pCR

revised to R5-185323

Huawei,HiSilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184302 Update of FR1 test case 6.3.3.2 pCR

revised to R5-185495

Huawei,HiSilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184303 Test Point analysis for FR1 Configured Output Power pCR Huawei,HiSilicon 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-184304 Draft TR 38.903 v0.3.0 draft TR Huawei,HiSilicon 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

withdrawn [WTS] [JSN]
R5-184305 WP - Support for V2V services based on LTE sidelink Work Plan Huawei LTE_SL_V2V-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184306 SR - Support for V2V services based on LTE sidelink WI status report Huawei LTE_SL_V2V-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184307 WP - Support for V2X services Work Plan Huawei LTE_V2X-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184308 SR - Support for V2X services WI status report Huawei LTE_V2X-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184309 WP - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell Work Plan Huawei LTE_CA_enh_b5C_PUCCH-UEConTest Rel-13 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184310 SR - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell WI status report Huawei LTE_CA_enh_b5C_PUCCH-UEConTest Rel-13 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184311 WP - Rel-14 eNB-IoT Work Plan Huawei NB_IOTenh-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184312 SR - Rel-14 eNB-IoT WI status report Huawei NB_IOTenh-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184313 Demodulation test case 8.11.1.1.1 and 8.11.1.1.2 updated for category M2 CR Ericsson 36.521-1 15.2.0 CR#4376 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.2

agreed [WTS] [JSN]
R5-184314 Update of Test Tolerance analyses for TDD-FDD CA PDSCH Closed Loop Single Layer Spatial Multiplexing 2x4 with TM4 Interference Model-Enhanced Performance Requirement Type A (2DL CA) CR LG Electronics 36.904 13.2.0 CR#56 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-13 R5-80

AI: 5.3.10.6

agreed [WTS] [JSN]
R5-184315 Update of Test Tolerance analyses for TDD-FDD CA PDSCH Single-layer Spatial Multiplexing 2x4 on antenna ports 7 or 8 with TM9 Interference Model-Enhanced Performance Requirement Type A (2DL CA) CR LG Electronics 36.904 13.2.0 CR#57 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-13 R5-80

AI: 5.3.10.6

agreed [WTS] [JSN]
R5-184316 Update of TDD-FDD CA PDSCH Closed Loop Single Layer Spatial Multiplexing 2x4 with TM4 Interference Model-Enhanced Performance Requirement Type A (2DL CA) CR LG Electronics 36.521-1 15.2.0 CR#4377 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.2

agreed [WTS] [JSN]
R5-184317 Update of TDD-FDD CA PDSCH Single-layer Spatial Multiplexing 2x4 on antenna ports 7 or 8 with TM9 Interference Model-Enhanced Performance Requirement Type A (2DL CA) CR LG Electronics 36.521-1 15.2.0 CR#4378 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.2

agreed [WTS] [JSN]
R5-184318 Correct IE GSCN-ValueNR CR

revised to R5-185035

Ericsson 38.508-1 15.0.0 CR#13 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184319 WP - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 (UID-790058) Work Plan China Unicom LTE450_Reg3-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184320 SR - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 for RAN5#80 WI status report China Unicom LTE450_Reg3-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184321 SR - LTE_QMC_Streaming-UEConTest (UID-790051) for RAN5#80 WI status report China Unicom LTE_QMC_Streaming-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184322 Correction to NB-IoT test cases 22.4.8 and 22.4.9 CR

revised to R5-185016

ANRITSU LTD 36.523-1 15.2.0 CR#4596 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

revised [WTS] [JSN]
R5-184323 Correction to SSAC connected mode test cases 13.5.1a and 13.5.3a for IMS Enabled UE CR

revised to R5-185126

Keysight Technologies UK Ltd 36.523-1 15.2.0 CR#4597 catF TEI12_Test Rel-15 R5-80

AI: 6.4.3.8

revised [WTS] [JSN]
R5-184324 Addition of 5GS NR SDAP test case 7.1.4.1 CR

revised to R5-185064

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#15 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184325 36.521-2 updates for category M2 test cases CR Ericsson 36.521-2 15.2.0 CR#741 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.3

agreed [WTS] [JSN]
R5-184326 New test case: 6.2.3A.3_2, Maximum Power Reduction (MPR) for CA (intra-band non-contiguous DL CA and UL CA) for UL 256QAM CR

revised to R5-185426

Ericsson 36.521-1 15.2.0 CR#4379 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

revised [WTS] [JSN]
R5-184327 Adding condition for CP-OFDM waveform CR Ericsson 38.508-1 15.0.0 CR#14 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184328 WP - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation Work Plan Sprint Corporation LTE_CA_C_B41_PC2-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184329 SR - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation WI status report Sprint Corporation LTE_CA_C_B41_PC2-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184330 Adding support for test SCS definition CR Ericsson 38.508-1 15.0.0 CR#15 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

withdrawn [WTS] [JSN]
R5-184331 Correction to Idle mode Inter-RAT G<>E test case 6.2.3.21 to allow optional IMS registration on EUTRAN cell CR

revised to R5-185004

Keysight Technologies UK Ltd, Samsung 36.523-1 15.2.0 CR#4598 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.1

revised [WTS] [JSN]
R5-184332 Test Frequencies CR

revised to R5-185173

Sprint Corporation, Ericsson 38.508-1 15.0.0 CR#16 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.2.1

revised [WTS] [JSN]
R5-184333 Updates to Annex B CR MCC TF160 38.523-3 15.0.0 CR#2 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.6

agreed [WTS] [JSN]
R5-184334 New Work Item Proposal: UE Conformance Test Aspects - Addition of Power Class 1 UE to bands B31/B72 for LTE WID new

revised to R5-185127

Airbus DS SLC Rel-15 R5-80

AI: 4.5.3

revised [WTS] [JSN]
R5-184335 Band 41 HPUE Maximum Output Power CR

revised to R5-185548

CMCC 36.521-1 15.2.0 CR#4380 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.2

revised [WTS] [JSN]
R5-184336 Correction of applicability to TS 36.521-2 for HPUE RF test cases CR

revised to R5-185541

CMCC 36.521-2 15.2.0 CR#742 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.3

revised [WTS] [JSN]
R5-184337 New WID on UE Conformance Test Aspects - ProSe Support for Band 72 in LTE WID new

revised to R5-185128

Airbus DS SLC Rel-15 R5-80

AI: 4.5.3

revised [WTS] [JSN]
R5-184338 Correction to 5GS MAC Test case 7.1.1.1.2 Random access procedure / Successful / C-RNTI Based / Preamble selected by MAC itself CR

revised to R5-185065

Qualcomm Korea 38.523-1 15.0.0 CR#16 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184339 Update of FR1 signal levels CR

revised to R5-185036

ANRITSU LTD 38.508-1 15.0.0 CR#17 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.2.2

revised [WTS] [JSN]
R5-184340 Correction to 5GS MAC Test case 7.1.1.5.3 DRX operation / Short cycle configured / Parameters configured by RRC CR

revised to R5-185066

Qualcomm Korea 38.523-1 15.0.0 CR#17 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184341 Correction to 5GS RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation CR

revised to R5-185067

Qualcomm Korea 38.523-1 15.0.0 CR#18 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184342 Correction to 5GS RLC Test case 7.1.2.3.11 AM RLC / RLC re-establishment procedure CR

revised to R5-185068

Qualcomm Korea 38.523-1 15.0.0 CR#19 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184343 Correction to 5GS PDCP Test case 7.1.3.4.1 PDCP handover / Lossless handover / PDCP sequence number maintenance / PDCP status report to convey the information on missing or acknowledged PDCP SDUs at handover / In-order delivery and duplicate elimination in the downlink CR Qualcomm Korea 38.523-1 15.0.0 CR#20 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184344 Correction to 5GS PDCP Test case 7.1.3.5.4 PDCP reordering / Maximum re-ordering delay below t-Reordering / t-Reordering timer operations CR Qualcomm Korea 38.523-1 15.0.0 CR#21 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184345 Addition of NR CA / NR SCell addition / modification / release / Success test cases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 CR

revised to R5-185069

Qualcomm Korea 38.523-1 15.0.0 CR#22 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184346 Modified RRC_Connected procedure for Multi PDN throughout the test case. CR

revised to R5-185163

Qualcomm Korea 38.508-1 15.0.0 CR#18 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184347 Modified RRC_IDLE procedure to allow multi PDN configuration throughout the test case CR Qualcomm Korea 38.508-1 15.0.0 CR#19 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-184348 Update EN-DC Generic Procedure Parameter for Multi-PDN addition throughout Test Case CR

revised to R5-185165

Qualcomm Korea 38.508-1 15.0.0 CR#20 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184349 Modification of EPS & Data Radio Bearer ID mapping for EN-DC Test cases CR

revised to R5-185166

Qualcomm Korea 36.508 15.2.0 CR#1188 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.

revised [WTS] [JSN]
R5-184350 Multi-PDN Handling in EN-DC discussion

revised to R5-185025

Qualcomm Korea 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.19

revised [WTS] [JSN]
R5-184351 ASN.1 Version Handling for NSA and SA discussion

revised to R5-185026

Qualcomm Korea 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.19

revised [WTS] [JSN]
R5-184352 Addition of Test frequency for EN-DC B1_n78 CR

revised to R5-185178

Qualcomm Korea 38.508-1 15.0.0 CR#21 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.2.2

revised [WTS] [JSN]
R5-184353 Corrections to RRC TC - BandwidthPart Configuration / SCG / EN-DC CR Qualcomm Tech. Netherlands B.V 38.523-1 15.0.0 CR#23 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184354 Corrections to RRC TC - PSCell addition, modification and release / SCG DRB / EN-DC CR

revised to R5-185149

Qualcomm Tech. Netherlands B.V 38.523-1 15.0.0 CR#24 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184355 Corrections to RRC TC - Bearer Modification / Handling for bearer type change with security key change / EN-DC CR

revised to R5-185150

Qualcomm Tech. Netherlands B.V 38.523-1 15.0.0 CR#25 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184356 Corrections to RRC TC - Bearer Modification / Uplink data path / Split DRB Reconfiguration / EN-DC CR

revised to R5-185151

Qualcomm Tech. Netherlands B.V 38.523-1 15.0.0 CR#26 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184357 Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC CR

revised to R5-185070

Qualcomm Tech. Netherlands B.V 38.523-1 15.0.0 CR#27 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184358 Addition of IP Connectivity check procedure CR

revised to R5-185037

Qualcomm Tech. Netherlands B.V 38.508-1 15.0.0 CR#22 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184359 Handling of Unified Access Control test cases in SA discussion Qualcomm Tech. Netherlands B.V 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.19

noted [WTS] [JSN]
R5-184360 Test Engineer CR TEOCO 36.521-1 15.2.0 CR#4381 catB LTE_NAICS-UEConTest Rel-15 R5-80

AI: 5.4.1.2.3

withdrawn [WTS] [JSN]
R5-184361 Discussion_38.521-3_ApplicabilityRules discussion

revised to R5-185558

Qualcomm Europe Inc. (Spain) Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184362 FR2_38.521-3_Applicability_SpuriousEmissions pCR

revised to R5-185559

Qualcomm Europe Inc. (Spain) 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184363 FR2_38.522_Applicability_SpuriousEmissions pCR

revised to R5-185560

Qualcomm Europe Inc. (Spain) 38.522 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.8

revised [WTS] [JSN]
R5-184364 Discussion_FR2_EVM_UBF_usage discussion Qualcomm Europe Inc. (Spain) Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184365 Discussion_FR2_RefSens_RSRP_vs_EIS discussion Qualcomm Europe Inc. (Spain) Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184366 Discussion_FR2_RefSens_TestPointAnalysis discussion Qualcomm Europe Inc. (Spain) Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184367 FR2_RefSens_TestConfig_38.521-2 pCR

revised to R5-185187

Qualcomm Europe Inc. (Spain) 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184368 Discussion_FR2_StoreTxRxBeamPeakCoordinates discussion

revised to R5-185561

Qualcomm Europe Inc. (Spain) Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184369 FR2_StoreTxRxBeamPeakCoordinates_38.521-2 pCR

revised to R5-185562

Qualcomm Europe Inc. (Spain) 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184370 FR2_StoreTxRxBeamPeakCoordinates_38.521-3 pCR

revised to R5-185563

Qualcomm Europe Inc. (Spain) 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184371 FR2_TxSpurious_TestPointAnalysis discussion

revised to R5-185489

Qualcomm Europe Inc. (Spain) Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184372 FR2_TxSpurious_TestConfig_38.521-2 pCR

revised to R5-185490

Qualcomm Europe Inc. (Spain) 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184373 FR2_UE_BeamlockInvoke_38.521-2 pCR

revised to R5-185555

Qualcomm Europe Inc. (Spain) 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184374 Update of TC 8.9.1.2.2_1 TDD PDSCH Closed Loop Single Layer Spatial Multiplexing for UE category 1bis CR CAICT 36.521-1 15.2.0 CR#4382 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-184375 Introduction of TC 6.1.1_2 E-UTRAN FDD Intra-frequency RRC Re-establishment for UE Category 1bis CR CAICT 36.521-3 15.2.1 CR#2259 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184376 Introduction of TC 6.1.2_2 E-UTRAN FDD Inter-frequency RRC Re-establishment for UE Category 1bis CR CAICT 36.521-3 15.2.1 CR#2260 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184377 Introduction of TC 6.1.3_2 E-UTRAN TDD Intra-frequency RRC Re-establishment for UE Category 1bis CR CAICT 36.521-3 15.2.1 CR#2261 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184378 Introduction of TC 6.1.4_2 E-UTRAN TDD Inter-frequency RRC Re-establishment for UE Category 1bis CR CAICT 36.521-3 15.2.1 CR#2262 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184379 Annex E,F RRM Cat1bis 6.1.x tests CR CAICT 36.521-3 15.2.1 CR#2263 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-184380 New feMTC test case 7.5EC Adjacent Channel Selectivity (ACS) for UE category M2 CR CAICT 36.521-1 15.2.0 CR#4383 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.2

agreed [WTS] [JSN]
R5-184381 New feMTC test case 7.6.1EC In-band blocking for UE category M2 CR CAICT 36.521-1 15.2.0 CR#4384 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.2

agreed [WTS] [JSN]
R5-184382 New feMTC test case 7.6.3EC Narrow band blocking for UE category M2 CR CAICT 36.521-1 15.2.0 CR#4385 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.2

agreed [WTS] [JSN]
R5-184383 New feMTC test case 7.8.1EC Wide band intermodulation for UE category M2 CR CAICT 36.521-1 15.2.0 CR#4386 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.2

agreed [WTS] [JSN]
R5-184384 Update of Annexes F.1.3 and F.3.3 CR CAICT 36.521-1 15.2.0 CR#4387 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.2

agreed [WTS] [JSN]
R5-184385 Update of TC 6.6.2.3A.4 Adjacent Channel Leakage power Ratio for CA (3UL CA) CR CAICT 36.521-1 15.2.0 CR#4388 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184386 WP UE Conformance Test Aspects - FDD operating band in the L-band for LTE Work Plan NTT DOCOMO, INC. LTE_FDD_L_band-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184387 SR UE Conformance Test Aspects - FDD operating band in the L-band for LTE WI status report NTT DOCOMO, INC. LTE_FDD_L_band-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184388 Update of TC 6.6.3.1A.4 Transmitter Spurious emissions for CA ( 3UL CA) CR CAICT 36.521-1 15.2.0 CR#4389 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184389 Addition of Band 74 information into TS 34.121-1 CR

revised to R5-185516

NTT DOCOMO, INC. 34.121-1 15.1.0 CR#1656 catF LTE_FDD_L_band-UEConTest Rel-15 R5-80

AI: 5.3.18.1

revised [WTS] [JSN]
R5-184390 Updates of Band 74 information about Tx test cases in TS 36.521-1 CR

revised to R5-185517

NTT DOCOMO, INC. 36.521-1 15.2.0 CR#4390 catF LTE_FDD_L_band-UEConTest Rel-15 R5-80

AI: 5.3.18.3

revised [WTS] [JSN]
R5-184391 WP - LTE_QMC_Streaming-UEConTest (UID-790051) Work Plan China Unicom LTE_QMC_Streaming-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184392 Updates of FR1 TRx MU in Annex F pCR

revised to R5-185444

NTT DOCOMO, INC. 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184393 Updates of 6.2.3.2 Test Frequency for CA_8A-27A CR

revised to R5-185023

KT Corp. 36.508 15.2.0 CR#1189 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 6.3.17.1

revised [WTS] [JSN]
R5-184394 Proposal on Test Tolerance table format in TS 38.521-1 Annex F discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184395 Updates of FR1 TRx TT in Annex F pCR

revised to R5-185565

NTT DOCOMO, INC. 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184396 New CA band combination CA_8A-27A - Updates of 7.3A Refsens CR KT Corp. 36.521-1 15.2.0 CR#4391 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-184397 Proposal on MU and TT table format in TS 38.521-2 discussion

revised to R5-185518

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184398 Updates of FR2 TRx MU and TT in Annex pCR

revised to R5-185519

NTT DOCOMO, INC. 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184399 New CA band combination CA_8A-27A - Updates of Table A.4.3.3.3-3 CR KT Corp. 36.523-2 15.2.0 CR#1192 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 6.3.17.3

agreed [WTS] [JSN]
R5-184400 MU and TT of EN-DC test cases in TS 38.521-3 discussion

revised to R5-185531

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184401 New CA band combination CA_8A-27A - Updates of Table A.4.6.3-3 CR KT Corp. 36.521-2 15.2.0 CR#743 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.3

withdrawn [WTS] [JSN]
R5-184402 Addition of TRx MU and TT in TS 38.521-3 Annex pCR

revised to R5-185520

NTT DOCOMO, INC. 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184403 New test case 6.3.5FA.1 Power Control Absolute power tolerance for category NB1 and NB2/Power Class 6 CR

revised to R5-185497

CAICT 36.521-1 15.2.0 CR#4392 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

revised [WTS] [JSN]
R5-184404 Correction of 6.2.3.2 Test Frequency for CA_3A-27A CR

revised to R5-185003

KT Corp. 36.508 15.2.0 CR#1190 catF TEI12_Test Rel-15 R5-80

AI: 6.4.1

revised [WTS] [JSN]
R5-184405 New test case 6.3.5FA.2 Power Control Relative power tolerance for category NB1 and NB2/Power Class 6 CR

revised to R5-185498

CAICT 36.521-1 15.2.0 CR#4393 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

revised [WTS] [JSN]
R5-184406 New test case 6.3.5FA.3 Aggregate power control tolerance for category NB1 and NB2/Power Class 6 CR

revised to R5-185499

CAICT 36.521-1 15.2.0 CR#4394 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

revised [WTS] [JSN]
R5-184407 Discussion on the structure of Clause 7.3A Reference sensitivity for CA in TS 38.521-1 discussion CMCC, Huawei 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184408 Discussion on the structure of Clause 7.7A Spurious response for CA in TS 38.521-1 discussion CMCC, Huawei 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184409 Addition of TT analysis of V2X TC 12.2.1 CR Huawei,HiSilicon, Anritsu, Rohde & Schwarz 36.903 14.1.0 CR#409 catF LTE_V2X-UEConTest Rel-14 R5-80

AI: 5.3.12.6

agreed [WTS] [JSN]
R5-184410 Addition of TT analysis of V2X TC 12.2.2 CR Huawei,HiSilicon, Anritsu, Rohde & Schwarz 36.903 14.1.0 CR#410 catF LTE_V2X-UEConTest Rel-14 R5-80

AI: 5.3.12.6

agreed [WTS] [JSN]
R5-184411 Addition of TT analysis of V2X TC 12.4 CR Huawei,HiSilicon, Anritsu, Rohde & Schwarz 36.903 14.1.0 CR#411 catF LTE_V2X-UEConTest Rel-14 R5-80

AI: 5.3.12.6

agreed [WTS] [JSN]
R5-184412 Update to test case 6.5.2A.1.4 for 3UL CA CR KTL 36.521-1 15.2.0 CR#4395 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184413 Update to test case 6.5.2A.2.4 for 3UL CA CR KTL 36.521-1 15.2.0 CR#4396 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184414 Update to test case 6.5.2A.3.4 for 3UL CA CR KTL 36.521-1 15.2.0 CR#4397 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184415 Update to test case 7.6.3A.8 and 7.8.1A.8 for 5DL CA CR KTL 36.521-1 15.2.0 CR#4398 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184416 Cleanning up SDR test cases for 4CC and 5CC using UL RMC CR KTL 36.521-1 15.2.0 CR#4399 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184417 Update to Performance test cases for LTE DL CA 4 Rx antenna ports CR KTL 36.521-1 15.2.0 CR#4400 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.2

agreed [WTS] [JSN]
R5-184418 Update to test case 6.3.2G.1 for V2V services based on LTE sidelink CR

revised to R5-185355

KTL 36.521-1 15.2.0 CR#4401 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

revised [WTS] [JSN]
R5-184419 Update to test case 6.3.2G.2 for LTE-based V2X Services CR

revised to R5-185364

KTL 36.521-1 15.2.0 CR#4402 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184420 Update to test case 6.3.2G.3 for LTE-based V2X Services CR

revised to R5-185365

KTL 36.521-1 15.2.0 CR#4403 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184421 Update to RRM test case 8.16.70 and 8.16.74 for 5DL CA CR KTL 36.521-3 15.2.1 CR#2264 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.4

agreed [WTS] [JSN]
R5-184422 Treatment of power supply cable for FR2 UE tests discussion

revised to R5-185525

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184423 Meeting notes of offline call on FR2 UE common test setup other Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184424 Common test setup for FR2 measurement uncertainty estimation discussion Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184425 Testability issue of maximum input level and ACS (case 2) in FR2 discussion Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184426 Estimation of measurement uncertainty for FR2 TRx test cases discussion

revised to R5-185335

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184427 Removing brackets from MU values in FR2 discussion

revised to R5-185336

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184428 TP to remove editor's note on frequency range of Tx Spurious emission pCR Anritsu 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

withdrawn [WTS] [JSN]
R5-184429 Offset in quality of quiet zone evaluation discussion

revised to R5-185526

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184430 TP on common test setup in FR2 pCR Anritsu 38.903 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

withdrawn [WTS] [JSN]
R5-184431 Testability issue of low PSD test cases in FR2 discussion

revised to R5-185527

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184432 New WID for Rel-16 LTE CA WID new

revised to R5-185000

Ericsson Rel-16 R5-80

AI: 4.1

revised [WTS] [JSN]
R5-184433 GCF 3GPP TCL after CAG#55 (GCF-CC v3.71.1 vs v3.70.2) report Ericsson R5-80

AI: 2.2

noted [WTS] [JSN]
R5-184434 RAN5#80 summary of changes to RAN5 test cases with potential impact on GCF and PTCRB report Ericsson, Samsung R5-80

AI: 7.5

noted [WTS] [JSN]
R5-184435 WP UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA Work Plan Ericsson LTE_UTRA_IncMon-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184436 SR UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA WI status report Ericsson LTE_UTRA_IncMon-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184437 WP UE Conformance Test Aspects - Rel-13 CA configurations Work Plan Ericsson LTE_CA_Rel13-UEConTest R5-80

AI: 7.4.2

available [WTS] [JSN]
R5-184438 SR UE Conformance Test Aspects - Rel-13 CA configurations WI status report Ericsson LTE_CA_Rel13-UEConTest R5-80

AI: 7.4.2

available [WTS] [JSN]
R5-184439 WP UE Conformance Test Aspects - Rel-14 CA configurations Work Plan Ericsson LTE_CA_R14-UEConTest R5-80

AI: 7.4.2

available [WTS] [JSN]
R5-184440 SR UE Conformance Test Aspects - Rel-14 CA configurations WI status report Ericsson LTE_CA_R14-UEConTest R5-80

AI: 7.4.2

available [WTS] [JSN]
R5-184441 WP UE Conformance Test Aspects - Rel-15 CA configurations Work Plan Ericsson LTE_CA_R15-UEConTest R5-80

AI: 7.4.2

available [WTS] [JSN]
R5-184442 SR UE Conformance Test Aspects - Rel-15 CA configurations WI status report Ericsson LTE_CA_R15-UEConTest R5-80

AI: 7.4.2

available [WTS] [JSN]
R5-184443 WP UE Conformance Test Aspects - 5G system with NR and LTE Work Plan Ericsson 5GS_NR_LTE-UEConTest R5-80

AI: 7.4.2

available [WTS] [JSN]
R5-184444 SR UE Conformance Test Aspects - 5G system with NR and LTE WI status report Ericsson 5GS_NR_LTE-UEConTest R5-80

AI: 7.4.2

available [WTS] [JSN]
R5-184445 Update of RAN5 5G NR phases and target update RAN5#80 discussion Ericsson 5GS_NR_LTE-UEConTest R5-80

AI: 7.2.3

not concluded [WTS] [JSN]
R5-184446 Revised WID on: UE Conformance Test Aspects - 5G system with NR and LTE WID revised Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.4.2

reserved [WTS] [JSN]
R5-184447 3GPP RAN5 CA status list (pre-RAN5#80 meeting) other Ericsson R5-80

AI: 2.2

noted [WTS] [JSN]
R5-184448 3GPP RAN5 CA status list (post-RAN5#80 meeting) other Ericsson R5-80

AI: 7.5

noted [WTS] [JSN]
R5-184449 Discussion paper on principles for defining NR test frequencies and selecting associated parameters for SS to signal discussion

revised to R5-185001

Ericsson, Sprint, MCC TF160 5GS_NR_LTE-UEConTest R5-80

AI: 4.2.1

revised [WTS] [JSN]
R5-184450 Introduction of test frequencies for NR band n1 CR

revised to R5-185250

Ericsson 38.508-1 15.0.0 CR#23 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184451 Introduction of test frequencies for NR band n2 CR

revised to R5-185251

Ericsson 38.508-1 15.0.0 CR#24 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184452 Introduction of test frequencies for NR band n3 CR

revised to R5-185252

Ericsson 38.508-1 15.0.0 CR#25 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184453 Introduction of test frequencies for NR band n5 CR

revised to R5-185253

Ericsson 38.508-1 15.0.0 CR#26 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184454 Introduction of test frequencies for NR band n7 CR

revised to R5-185254

Ericsson 38.508-1 15.0.0 CR#27 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184455 Introduction of test frequencies for NR band n8 CR

revised to R5-185255

Ericsson 38.508-1 15.0.0 CR#28 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184456 Introduction of test frequencies for NR band n12 CR

revised to R5-185256

Ericsson 38.508-1 15.0.0 CR#29 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184457 Introduction of test frequencies for NR band n20 CR

revised to R5-185257

Ericsson 38.508-1 15.0.0 CR#30 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184458 Introduction of test frequencies for NR band n25 CR

revised to R5-185258

Ericsson 38.508-1 15.0.0 CR#31 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184459 Introduction of test frequencies for NR band n28 CR

revised to R5-185259

Ericsson 38.508-1 15.0.0 CR#32 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184460 Introduction of test frequencies for NR band n34 CR

revised to R5-185260

Ericsson 38.508-1 15.0.0 CR#33 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184461 Introduction of test frequencies for NR band n38 CR

revised to R5-185261

Ericsson 38.508-1 15.0.0 CR#34 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184462 Introduction of test frequencies for NR band n39 CR

revised to R5-185262

Ericsson 38.508-1 15.0.0 CR#35 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184463 Introduction of test frequencies for NR band n40 CR

revised to R5-185263

Ericsson 38.508-1 15.0.0 CR#36 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184464 Update of test frequencies for NR band n41 CR

revised to R5-185264

Ericsson, Sprint 38.508-1 15.0.0 CR#37 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184465 Introduction of test frequencies for NR band n51 CR

revised to R5-185265

Ericsson 38.508-1 15.0.0 CR#38 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184466 Introduction of test frequencies for NR band n66 CR

revised to R5-185266

Ericsson, Dish Network 38.508-1 15.0.0 CR#39 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184467 Introduction of test frequencies for NR band n70 CR

revised to R5-185267

Ericsson, Dish Network 38.508-1 15.0.0 CR#40 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184468 Update of test frequencies for NR band n71 CR

revised to R5-185268

Ericsson, Dish Network 38.508-1 15.0.0 CR#41 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184469 Introduction of test frequencies for NR band n75 CR

revised to R5-185269

Ericsson 38.508-1 15.0.0 CR#42 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184470 Introduction of test frequencies for NR band n76 CR

revised to R5-185270

Ericsson 38.508-1 15.0.0 CR#43 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184471 Introduction of test frequencies for NR band n77 CR Ericsson 38.508-1 15.0.0 CR#44 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184472 Introduction of test frequencies for NR band n78 CR Ericsson 38.508-1 15.0.0 CR#45 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184473 Introduction of test frequencies for NR band n79 CR Ericsson 38.508-1 15.0.0 CR#46 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184474 Introduction of test frequencies for NR band n257 CR Ericsson 38.508-1 15.0.0 CR#47 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184475 Introduction of test frequencies for NR band n258 CR Ericsson 38.508-1 15.0.0 CR#48 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184476 Introduction of test frequencies for NR band n260 CR Ericsson, Bureau Veritas 38.508-1 15.0.0 CR#49 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184477 Introduction of test frequencies for NR band n261 CR Ericsson 38.508-1 15.0.0 CR#50 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184478 Introduction of test frequencies for signalling testing in clause 6 CR

revised to R5-185177

Ericsson, TF160 38.508-1 15.0.0 CR#51 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.2.2

revised [WTS] [JSN]
R5-184479 Update to FR1 test case 6.5.4 Transmit intermodulation pCR

revised to R5-185445

KTL 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184480 New test case 6.5.2.1FA.1 Error Vector Magnitude (EVM) for category NB1 and NB2/Power Class 6 CR CAICT 36.521-1 15.2.0 CR#4404 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

withdrawn [WTS] [JSN]
R5-184481 New test case 6.5.2.2FA Carrier leakage for category NB1 and NB2/Power Class 6 CR CAICT 36.521-1 15.2.0 CR#4405 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

withdrawn [WTS] [JSN]
R5-184482 New test case 6.5.2.3FA In-band emissions for non allocated RB for category NB1 and NB2/Power Class 6 CR CAICT 36.521-1 15.2.0 CR#4406 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

withdrawn [WTS] [JSN]
R5-184483 Add and use reference to NG.108 CR ROHDE & SCHWARZ, Qualcomm Incorporated 34.229-1 14.3.0 CR#1291 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-14 R5-80

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-184484 Proposal for remaining Maximum Test System Uncertainty for NR FR1 TRx tests discussion Anritsu, ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184485 Test approach of EN-DC Rx tests with multiple LTE/NR CCs discussion

revised to R5-185529

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184486 Correction to power level for FR1 RF tests CR

revised to R5-185443

Anritsu 38.508-1 15.0.0 CR#52 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184487 Discussion on FR2 TRx spurious test procedure discussion

revised to R5-185347

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184488 Discussion on UL RMC for FR2 spurious test discussion

revised to R5-185533

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184489 Discussion on test point selection for NR Out-of-band in FR1 discussion

revised to R5-185301

CAICT 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184490 Introduction of TC 7.6.3 Out-of-band blocking pCR

revised to R5-185524

CAICT 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184491 Clean up EN-DC FR1 TRx TCs pCR Anritsu 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

withdrawn [WTS] [JSN]
R5-184492 Add Test Tolerance and Annex F for NAICS feature applicable in test case 8.3.1.1.7 and 8.3.2.1.8. CR TEOCO 36.521-1 12.9.0 CR#4407 catF TEI12_Test Rel-12 R5-80

AI: 5.4.1.2

withdrawn [WTS] [JSN]
R5-184493 Correction of NB-IoT test case 22.5.20 CR CATT, TDIA 36.523-1 15.2.0 CR#4599 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-184494 Correction of NB-IoT test case 22.5.21 CR CATT, TDIA 36.523-1 15.2.0 CR#4600 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-184495 Addition of new 5GC TC 9.1.2.1 CR CATT, TDIA 38.523-1 15.0.0 CR#28 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-184496 Addition of applicability and tests conditions for 5GC test cases 8.2.4.3.1.2, 8.2.4.3.1.3, 9.1.2.1 and 9.1.2.2 CR

revised to R5-185102

CATT, TDIA 38.523-2 15.0.0 CR#2 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.5

revised [WTS] [JSN]
R5-184497 Discussion on Uplink configuration for NR Transmit Intermodulation in FR1 discussion

revised to R5-185423

KTL 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184498 Correction to 5GS RRC TC 8.2.4.3.1.1 CR

revised to R5-185071

TDIA, CATT 38.523-1 15.0.0 CR#29 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184499 Addition of 5GS RRC TC 8.2.4.3.1.2 CR

revised to R5-185072

TDIA, CATT 38.523-1 15.0.0 CR#30 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184500 Addition of new 5GS RRC TC 8.2.4.3.1.3 CR TDIA, CATT 38.523-1 15.0.0 CR#31 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184501 Addition to NB-IoT testcase 22.3.1.6a CR

revised to R5-185115

TDIA, CATT, Starpoint 36.523-1 15.2.0 CR#4601 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

revised [WTS] [JSN]
R5-184502 Addition of antenna diagrams for IncMon RRM test cases CR

revised to R5-185454

Ericsson 36.508 15.2.0 CR#1191 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.4

revised [WTS] [JSN]
R5-184503 Update of number of DL PDCP SDUs in test cases 7.1.7.1.x CR

revised to R5-185005

MediaTek Inc. 36.523-1 15.2.0 CR#4602 catF TEI14_Test Rel-15 R5-80

AI: 6.4.3.2.1

revised [WTS] [JSN]
R5-184504 Update of DL 256QAM TCs for high UE DL Categories CR

revised to R5-185006

MediaTek Inc. 36.523-1 15.2.0 CR#4603 catF TEI12_Test, LTE_SC_enh_L1-UEConTest Rel-15 R5-80

AI: 6.4.3.2.1

revised [WTS] [JSN]
R5-184505 Correction to RRC TC 8.5.4.1 CR

revised to R5-185007

MediaTek Inc. 36.523-1 15.2.0 CR#4604 catF TEI14_Test Rel-15 R5-80

AI: 6.4.3.3.1

revised [WTS] [JSN]
R5-184506 Correction to RRC TC 8.5.4.3 CR MediaTek Inc. 36.523-1 15.2.0 CR#4605 catF TEI13_Test Rel-15 R5-80

AI: 6.4.3.3.1

withdrawn [WTS] [JSN]
R5-184507 Correction to EMM TC 9.2.1.1.24 CR MediaTek Inc. 36.523-1 15.2.0 CR#4606 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.4

agreed [WTS] [JSN]
R5-184508 Correction to ESM TC 10.5.4 CR MediaTek Inc. 36.523-1 15.2.0 CR#4607 catF TEI10_Test Rel-15 R5-80

AI: 6.4.3.5

agreed [WTS] [JSN]
R5-184509 Handling on TT defining from MU in FR2 discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184510 Correction to CSFB TC 13.1.12 CR MediaTek Inc. 36.523-1 15.2.0 CR#4608 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.8

agreed [WTS] [JSN]
R5-184511 Updates of receiver test cases for CA_XA-YE CR

revised to R5-185514

NTT DOCOMO, INC. 36.521-1 15.2.0 CR#4408 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

revised [WTS] [JSN]
R5-184512 Correction to applicability of TC 7.1.7.1.6a CR MediaTek Inc. 36.523-2 15.2.0 CR#1193 catF TEI14_Test Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184513 Correction to applicability of DL 256QAM TCs CR MediaTek Inc. 36.523-2 15.2.0 CR#1194 catF TEI12_Test, LTE_SC_enh_L1-UEConTest Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184514 Editorial correction of referred table number CR MediaTek Inc. 36.523-2 15.2.0 CR#1195 catF TEI10_Test Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184515 Addition of message content for RRM IncMon test cases CR

revised to R5-185455

Ericsson 36.508 15.2.0 CR#1192 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.4

revised [WTS] [JSN]
R5-184516 Updates of receiver test cases for CA_XA-YD CR

revised to R5-185515

NTT DOCOMO, INC. 36.521-1 15.2.0 CR#4409 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

revised [WTS] [JSN]
R5-184517 Correction to NR PDCP test case 7.1.3.4.2 CR Keysight Technologies UK Ltd, MCC TF160 38.523-1 15.0.0 CR#32 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184518 Correction to NB-IoT test case 22.2.9 CR

revised to R5-185018

ANRITSU LTD 36.523-1 15.2.0 CR#4609 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

revised [WTS] [JSN]
R5-184519 Addition of applicability of RRM IncMon test cases CR

revised to R5-185453

Ericsson 36.521-2 15.2.0 CR#744 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.5

revised [WTS] [JSN]
R5-184520 Corrections to Layer 2 test cases CR

revised to R5-185073

Motorola Mobility 38.523-1 15.0.0 CR#33 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184521 Corrections to MAC test case 7.1.2.2.1 CR

revised to R5-185074

Motorola Mobility, MCC TF160 38.523-1 15.0.0 CR#34 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184522 Corrections to MAC test case 7.1.2.3.1 CR

revised to R5-185075

Motorola Mobility, MCC TF160 38.523-1 15.0.0 CR#35 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184523 Corrections to MAC TBS test cases CR Motorola Mobility 38.523-1 15.0.0 CR#36 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184524 Addition of new MAC RACH test case for PDCCH order CR

revised to R5-185076

Motorola Mobility 38.523-1 15.0.0 CR#37 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184525 Addition of new MAC test case for Power Headroom report CR

revised to R5-185152

Motorola Mobility 38.523-1 15.0.0 CR#38 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184526 Addition of new MAC test case for Scell Activation Deactivation CR

revised to R5-185077

Motorola Mobility 38.523-1 15.0.0 CR#39 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184527 Addition of new MAC test case for Reset CR Motorola Mobility 38.523-1 15.0.0 CR#40 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184528 Addition of new MAC UL TBS test case with transform precoding configured CR

revised to R5-185078

Motorola Mobility 38.523-1 15.0.0 CR#41 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184529 WP UE Conformance Test Aspects – 5G System Non-3GPP Access Work Plan Motorola Mobility 5GS_Ph1-CT_n3GPPA-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184530 SR UE Conformance Test Aspects – 5G System Non-3GPP Access WI status report Motorola Mobility 5GS_Ph1-CT_n3GPPA-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184531 Addition of missing and new test cases applicabilities CR

revised to R5-185162

Motorola Mobility 38.523-2 15.0.0 CR#3 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.5

revised [WTS] [JSN]
R5-184532 Correction to testcase 9.2.2.1.9 for CAT-M1 UEs CR

revised to R5-185009

ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.2.0 CR#4610 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 6.4.3.4

revised [WTS] [JSN]
R5-184533 PRD-17 on Guidance to Work Item Codes version 3.13 (post RAN#81 version) other Rapporteur (BlackBerry) R5-80

AI: 7.3

noted [WTS] [JSN]
R5-184534 TS 36.523-1 Status before RAN5#80 other Rapporteur (BlackBerry) R5-80

AI: 6.4.6

noted [WTS] [JSN]
R5-184535 TS 36.523-1 Status after RAN5#80 other Rapporteur (BlackBerry) R5-80

AI: 6.4.6

withdrawn [WTS] [JSN]
R5-184536 Correction to testcases 9.2.1.2.1c and 9.2.1.2.1d applicability conditions for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-2 15.2.0 CR#1196 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184537 Proposal for Work Plans discussion BlackBerry R5-80

AI: 4.2.2

noted [WTS] [JSN]
R5-184538 Correction to testcases 6.1.1.1, 6.1.1.1b and applicability conditions for CAT-M1 UEs CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-2 15.2.0 CR#1197 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 6.4.4

withdrawn [WTS] [JSN]
R5-184539 Update of DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 CR SRTC 36.521-1 15.2.0 CR#4410 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184540 Update MU and TT of V2X test case 6.5.1G.2 Frequency error for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CR CAICT 36.521-1 15.2.0 CR#4411 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-184541 Correction to eMTC tc 6.2.2EA, UE Maximum Output Power for UE category M1 CR Ericsson 36.521-1 15.2.0 CR#4412 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 5.4.1.2

agreed [WTS] [JSN]
R5-184542 Applicability for DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 CR

revised to R5-185488

SRTC 36.521-2 15.2.0 CR#745 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.3

revised [WTS] [JSN]
R5-184543 Correction to CAT-M1 Test case 8.2.4.27 CR

revised to R5-185159

Anritsu Ltd., Nordic Semiconductor ASA 36.523-1 15.2.0 CR#4611 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 6.4.3.3.2

revised [WTS] [JSN]
R5-184544 Update of V2X test case 6.7G.2 CR

revised to R5-185366

SRTC 36.521-1 15.2.0 CR#4413 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184545 Addition of new TC 6.6.2.3G.2 CR

revised to R5-185367

SRTC 36.521-1 15.2.0 CR#4414 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184546 Introduction of new V2X test case 6.5.2.1G.2 Error Vector Magnitude (EVM) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CR

revised to R5-185368

CAICT 36.521-1 15.2.0 CR#4415 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184547 TS 36.523-1 Status after RAN5#80 other Rapporteur (BlackBerry) R5-80

AI: 6.4.6

noted [WTS] [JSN]
R5-184548 Introduction of new V2X test case 6.5.2.1G.3 Error Vector Magnitude (EVM) for V2X Communication / Intra-band contiguous multi-carrier operation CR

revised to R5-185369

CAICT 36.521-1 15.2.0 CR#4416 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184549 Correction to V2X TC 24.1.2, 24.1.16 & 24.1.19 CR ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.2.0 CR#4612 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

withdrawn [WTS] [JSN]
R5-184550 Draft TS 38.521-2 v0.6.0 draft TS CAICT 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

withdrawn [WTS] [JSN]
R5-184551 Correction to MAC test cases with TB Size selection CR ANRITSU LTD 36.523-1 15.2.0 CR#4613 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.2.1

agreed [WTS] [JSN]
R5-184552 Correction to default pre-test conditions for UM RLC test cases CR

revised to R5-185079

Keysight Technologies UK Ltd 38.523-1 15.0.0 CR#42 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184553 Update of (NS_01/NS_17), (NS_03/NS_07), (NS_05/NS_01) and (NS_05/NS_17) TP analysis for A-MPR test case for inter-band UL CA CR CETECOM GmbH 36.905 15.1.0 CR#149 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-80

AI: 5.4.1.5.4

agreed [WTS] [JSN]
R5-184554 Correction of test points and test requirements for TC 6.2.4A.2 CR

revised to R5-185436

CETECOM GmbH 36.521-1 15.2.0 CR#4417 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-80

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-184555 Correction of test points and test requirements for TC 6.2.4A.2_1 CR

revised to R5-185435

CETECOM GmbH 36.521-1 15.2.0 CR#4418 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-184556 Addition of new UL 256QAM test case - A-MPR for 2UL CA intra-band contiguous CR

revised to R5-185434

CETECOM GmbH 36.521-1 15.2.0 CR#4419 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

revised [WTS] [JSN]
R5-184557 Addition of new UL 256QAM test case - A-MPR for 2UL CA inter-band CR CETECOM GmbH 36.521-1 15.2.0 CR#4420 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

agreed [WTS] [JSN]
R5-184558 Addition of new UL 256QAM test case - Annex F CR CETECOM GmbH 36.521-1 15.2.0 CR#4421 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

agreed [WTS] [JSN]
R5-184559 Updates to feMTC tc 6.2.2EC UE Maximum Output Power for UE category M2 CR Ericsson 36.521-1 15.2.0 CR#4422 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.2

agreed [WTS] [JSN]
R5-184560 Introduce SA radio resource control information elements CR

revised to R5-185038

Ericsson 38.508-1 15.0.0 CR#53 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184561 WP - UE Conformance Test Aspects - eHST Work Plan

revised to R5-185181

CMCC LTE_high_speed-UEConTest R5-80

AI: 7.4.2

revised [WTS] [JSN]
R5-184562 SR - eHST after RAN5#80 WI status report

revised to R5-185182

CMCC LTE_high_speed-UEConTest R5-80

AI: 7.4.2

revised [WTS] [JSN]
R5-184563 Add Clause 7.5B.1 into TS 38.521-3 pCR

revised to R5-185503

CMCC 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184564 Add Clause 7.5B.2 into TS 38.521-3 pCR

revised to R5-185504

CMCC 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184565 Add Clause 7.5B.3 into TS 38.521-3 pCR

revised to R5-185505

CMCC 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184566 Draft TS 36.579-7 v0.0.1 draft TS Samsung MCImp-UEConTest Rel-16 R5-80

AI: 7.5

withdrawn [WTS] [JSN]
R5-184567 Draft TS 38.522 v1.0.1 draft TS CMCC 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-184568 OTA Chamber requirements for 5G NR Signalling test cases discussion

revised to R5-185132

Keysight Technologies UK Ltd R5-80

AI: 6.3.13.19

revised [WTS] [JSN]
R5-184569 Add Band 31 Test Frequencies for NB-IoT Inter-frequency Test cases CR ANRITSU LTD 36.508 15.2.0 CR#1193 catF TEI14_Test Rel-15 R5-80

AI: 5.4.1.1

agreed [WTS] [JSN]
R5-184570 Corrections for 5MHz Channel BW in 4.2.19, 6.x.y and 7.3.x NB-IoT Test cases CR ANRITSU LTD 36.521-3 15.2.1 CR#2265 catF TEI14_Test Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184571 Draft TS 36.579-6 v0.0.1 draft TS Samsung MCImp-UEConTest Rel-16 R5-80

AI: 7.5

withdrawn [WTS] [JSN]
R5-184572 General clauses updated for TS38.521-1 pCR Bureau Veritas 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-184573 DL and UL RMC updated for FR1 tests pCR

revised to R5-185390

Bureau Veritas 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184574 Downlink physical channel updated for FR1 tests pCR Huawei, Bureau Veritas 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-184575 OCNG Patterns updated for FR1 tests pCR

revised to R5-185521

Bureau Veritas 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184576 DL and UL RMC updated for FR2 tests pCR

revised to R5-185188

Bureau Veritas 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184577 Downlink physical channel updated for FR2 tests pCR

revised to R5-185189

Bureau Veritas 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184578 OCNG Patterns updated for FR2 tests pCR

revised to R5-185190

Bureau Veritas 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184579 Updated EN-DC configuration information in clause 5 pCR Bureau Veritas 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-184580 TIB value add for EN-DC band in 38.521-3 pCR Bureau Veritas 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-184581 Applicability C20 updated for intra-band contigous DL CA tests CR Bureau Veritas 36.521-2 15.2.0 CR#746 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-184582 Updated to Tested CA Configurations Selection Criteria CR Bureau Veritas 36.521-2 15.2.0 CR#747 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.3

withdrawn [WTS] [JSN]
R5-184583 Table format correct and removed redundant line for RF clause 7 test cases CR

revised to R5-185528

Bureau Veritas 36.521-2 15.2.0 CR#748 catF TEI8_Test Rel-15 R5-80

AI: 5.4.1.3

revised [WTS] [JSN]
R5-184584 Table format correct and removed redundant line for RF clause 6 test cases CR Bureau Veritas 36.521-2 15.2.0 CR#749 catF TEI8_Test Rel-15 R5-80

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-184585 Updated test requirement to RF clause 7 test cases for CA band CR Bureau Veritas 36.521-1 15.2.0 CR#4423 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184586 Align CA information in clause 5 with TS36.101 v15.3.0 CR Bureau Veritas 36.521-1 15.2.0 CR#4424 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-184587 Addition of new R15 CA configurations to 36.521-2 CR Bureau Veritas 36.521-2 15.2.0 CR#750 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.3

withdrawn [WTS] [JSN]
R5-184588 Addition of new R15 CA configurations to 36.523-2 CR

revised to R5-185024

Bureau Veritas, Ericsson 36.523-2 15.2.0 CR#1198 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 6.3.17.3

revised [WTS] [JSN]
R5-184589 Addition of RRM IncMon new Test Case 8.4.8 CR

revised to R5-185457

Ericsson 36.521-3 15.2.1 CR#2266 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184590 Addition of RRM IncMon new Test Case 8.4.9 CR

revised to R5-185458

Ericsson 36.521-3 15.2.1 CR#2267 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184591 New NAS test case 9.1.5.1.12 CR

revised to R5-185080

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#43 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184592 WP UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE Work Plan Qualcomm Europe Inc. (Spain) LTE_eLAA-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184593 New NAS test case 9.1.6.1.4 CR

revised to R5-185081

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#44 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184594 SR UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE WI status report Qualcomm Europe Inc. (Spain) LTE_eLAA-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184595 WID Update UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE WID revised Qualcomm Europe Inc. (Spain) LTE_eLAA-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184596 Correction to NB-IoT test case 22.4.20a execution guideline CR Anritsu Ltd, Qualcomm 36.523-2 15.2.0 CR#1199 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.4

withdrawn [WTS] [JSN]
R5-184597 Update IE PhysicalCellGroupConfig CR

revised to R5-185039

Ericsson 38.508-1 15.0.0 CR#54 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184598 Introduce cell configurations and timer tolerances chapter headers CR

revised to R5-185040

Ericsson 38.508-1 15.0.0 CR#55 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184599 Add IE SS-RSSI-Measurement CR Ericsson 38.508-1 15.0.0 CR#56 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-184600 Add IE SSB-MTC CR

revised to R5-185041

Ericsson 38.508-1 15.0.0 CR#57 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184601 Introduction of new test case TC 6.2.5A.4 Configured UE transmitted Output Power for CA (3UL CA) CR

revised to R5-185538

7LAYERS GmbH 36.521-1 15.2.0 CR#4425 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184602 Introduction of new test case TC 6.6.2.1A.4 Spectrum emission mask for CA (3UL CA) CR

revised to R5-185539

7LAYERS GmbH 36.521-1 15.2.0 CR#4426 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184603 Correction to NR PDCP test case 7.1.3.5.1 CR

revised to R5-185082

ANRITSU LTD 38.523-1 15.0.0 CR#45 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184604 Introduction of new test case TC 6.6.2.2A.4 Additional Spectrum Emission Mask for CA (3UL CA) CR 7LAYERS GmbH 36.521-1 15.2.0 CR#4427 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184605 Update of test case TC 6.6.1A.4 “Occupied bandwidth for CA (3DL CA and 3UL CA)” CR 7LAYERS GmbH 36.521-1 15.2.0 CR#4428 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

withdrawn [WTS] [JSN]
R5-184606 Update of test case TC 6.7A.4 "Transmit intermodulation for CA (3DL CA and 3UL CA)" CR

revised to R5-185540

7LAYERS GmbH 36.521-1 15.2.0 CR#4429 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184607 Draft TS 36.579-6 v0.0.2 draft TS NIST MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.6

approved [WTS] [JSN]
R5-184608 Draft TS 36.579-7 v0.0.2 draft TS NIST MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.7

approved [WTS] [JSN]
R5-184609 SR - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest WI status report NIST MCImp-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184610 WP - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest.doc Work Plan NIST MCImp-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184611 New Test Case for 36.579-6 - 6.1.1.8 pCR NIST 36.579-6 0.0.0 MCImp-UEConTest Rel-16 R5-80

AI: 6.3.23.6

withdrawn [WTS] [JSN]
R5-184612 Correction to NR RLC test case 7.1.2.3.3 and 7.1.2.3.4 CR

revised to R5-185083

ANRITSU LTD 38.523-1 15.0.0 CR#46 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184613 Addition of RRC Default Pre-test conditions for NSA CR

revised to R5-185153

Qualcomm Korea 38.523-1 15.0.0 CR#47 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184614 Updates to EN-DC Conditions for Multi-PDN addition throughout Test Case CR Qualcomm Korea 36.508 15.2.0 CR#1194 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.

withdrawn [WTS] [JSN]
R5-184615 CR of Correct handling of DL assignment / Semi-persistent test case 7.1.1.6.1 CR Huawei, Hisilicon 38.523-1 15.0.0 CR#48 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-184616 Update BWP CR

revised to R5-185042

DOCOMO Communications Lab, Ericsson 38.508-1 15.0.0 CR#58 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184617 Update MIB CR DOCOMO Communications Lab. 38.508-1 15.0.0 CR#59 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-184618 Update PDSCH-Config CR

revised to R5-185043

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#60 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184619 Update PhysicalCellGroupConfig CR DOCOMO Communications Lab. 38.508-1 15.0.0 CR#61 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

withdrawn [WTS] [JSN]
R5-184620 Update PUCCH and PUSCH configuration CR

revised to R5-185044

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#62 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184621 Update RACH configuration CR

revised to R5-185045

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#63 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184622 Update SearchSpace CR DOCOMO Communications Lab. 38.508-1 15.0.0 CR#64 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

withdrawn [WTS] [JSN]
R5-184623 Update CellGroupConfig CR

revised to R5-185046

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#65 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184624 Update CSI-MeasConfig CR

revised to R5-185047

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#66 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184625 Update MeasConfig CR

revised to R5-185048

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#67 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184626 Update other information elements CR

revised to R5-185049

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#68 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184627 Update PDCCH-Config CR DOCOMO Communications Lab. 38.508-1 15.0.0 CR#69 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

withdrawn [WTS] [JSN]
R5-184628 Update RadioBearerConfig CR

revised to R5-185050

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#70 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184629 Update ServingCellConfig CR DOCOMO Communications Lab. 38.508-1 15.0.0 CR#71 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

withdrawn [WTS] [JSN]
R5-184630 Editorial Update in clause 4.6.3 CR DOCOMO Communications Lab. 38.508-1 15.0.0 CR#72 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-184631 Adding TC 13.1.21 for emergency call via CS domain CR DOCOMO Communications Lab. 36.523-1 15.2.0 CR#4614 catF TEI9_Test Rel-15 R5-80

AI: 6.4.3.8

agreed [WTS] [JSN]
R5-184632 Addition of new V2X test case 24.2.4 CR

revised to R5-185107

CAICT 36.523-1 15.2.0 CR#4615 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

revised [WTS] [JSN]
R5-184633 Addition of new applicability of emergency call via CS domain TC for IMS capable UE CR DOCOMO Communications Lab. 36.523-2 15.2.0 CR#1200 catF TEI9_Test Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184634 Correction to FR2 Spurious TC and inroduction of TRP measurement grid requirement pCR

revised to R5-185348

Anritsu 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184635 Emergency call via CS domain TC in case of IMS voice not available discussion DOCOMO Communications Lab. R5-80

AI: 6.4.6

noted [WTS] [JSN]
R5-184636 Correction to V2X test case 24.1.12 CR

revised to R5-185108

CAICT 36.523-1 15.2.0 CR#4616 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

revised [WTS] [JSN]
R5-184637 Addition of test applicability for new V2X TC24.2.4 and Specific ICS for V2X TC24.2.1 and TC24.2.2 CR CAICT 36.523-2 15.2.0 CR#1201 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.4

agreed [WTS] [JSN]
R5-184638 CA_1A-3A-26A(1UL) - Updates of test points analysis CR KDDI Corporation 36.905 15.1.0 CR#150 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.

agreed [WTS] [JSN]
R5-184639 CA_1A-3A-26A(1UL) –Updates of 7.3A.5 REFSENS CR KDDI Corporation 36.521-1 15.2.0 CR#4430 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184640 Introduction of Additional spurious emissions for UL 256QAM CR

revised to R5-185406

TTA 36.521-1 15.2.0 CR#4431 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

revised [WTS] [JSN]
R5-184641 CA_3A-18A - Updates of test points analysis CR

revised to R5-185543

KDDI Corporation 36.905 15.1.0 CR#151 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.

revised [WTS] [JSN]
R5-184642 CA_3A-18A - Updates of some Tx test cases CR

revised to R5-185542

KDDI Corporation 36.521-1 15.2.0 CR#4432 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

revised [WTS] [JSN]
R5-184643 Addition of applicability for TC6.6.3.3_2 CR

revised to R5-185407

TTA 36.521-2 15.2.0 CR#751 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.3

revised [WTS] [JSN]
R5-184644 Editorial: Cleaning up the style of Annex B.4.1A in TS 36.521-1 CR TTA 36.521-1 15.2.0 CR#4433 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-80

AI: 5.3.15.2

agreed [WTS] [JSN]
R5-184645 CA_3A-18A and 1A-3A-18A - Updates of A.4.6.3 CR

revised to R5-185486

KDDI Corporation 36.521-2 15.2.0 CR#752 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.3

revised [WTS] [JSN]
R5-184646 Introduction of FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO CR

revised to R5-185387

TTA 36.521-1 15.2.0 CR#4434 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-80

AI: 5.3.15.2

revised [WTS] [JSN]
R5-184647 Correction of test requirements in 7.3.5A REFSENSE CR KDDI Corporation 36.521-1 15.2.0 CR#4435 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-184648 Introduction of TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO CR

revised to R5-185388

TTA 36.521-1 15.2.0 CR#4436 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-80

AI: 5.3.15.2

revised [WTS] [JSN]
R5-184649 Applicabilities addition of test cases 8.3.1.1.9 and 8.3.2.1.10 CR

revised to R5-185389

TTA 36.521-2 15.2.0 CR#753 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-80

AI: 5.3.15.3

revised [WTS] [JSN]
R5-184650 Editorial correction of Table 7.6.3A.5.4.1-1 CR KDDI Corporation 36.521-1 15.2.0 CR#4437 catF TEI12_Test Rel-15 R5-80

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-184651 Update of TC8.12.1.1.3 CR TTA 36.521-1 15.2.0 CR#4438 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

agreed [WTS] [JSN]
R5-184652 Correction to V2X test case 24.1.1, 24.1.3, 24.1.5, 24.1.6, 24.1.10 and 24.1.11 CR

revised to R5-185109

CAICT 36.523-1 15.2.0 CR#4617 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

revised [WTS] [JSN]
R5-184653 Update of Additional Maximum Power Reduction (A-MPR) for V2X Communication / Non-concurrent with E-UTRA uplink transmissions CR

revised to R5-185356

LG Electronics 36.521-1 15.2.0 CR#4439 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

revised [WTS] [JSN]
R5-184654 Update to applicability V2X communication test cases for simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CR LG Electronics 36.521-2 15.2.0 CR#754 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.4

withdrawn [WTS] [JSN]
R5-184655 Update to Additional Maximum Power Reduction (A-MPR) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CR

revised to R5-185370

LG Electronics 36.521-1 15.2.0 CR#4440 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184656 Update to Configured UE transmitted Output Power for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmission CR LG Electronics 36.521-1 15.2.0 CR#4441 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

withdrawn [WTS] [JSN]
R5-184657 Update to UE Transmit OFF power for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CR LG Electronics. 36.521-1 15.2.0 CR#4442 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

withdrawn [WTS] [JSN]
R5-184658 Update to General ON/OFF time mask for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CR

revised to R5-185535

LG Electronics. 36.521-1 15.2.0 CR#4443 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184659 Draft TS 38.521-3 v0.6.0 draft TS Qualcomm Wireless GmbH 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

withdrawn [WTS] [JSN]
R5-184660 Update to Maximum Power Reduction (MPR) for V2X Communication / Power class 3 / Contiguous allocation of PSCCH and PSSCH / Non-concurrent with E-UTRA uplink transmissions CR LG Electronics. 36.521-1 15.2.0 CR#4444 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-184661 Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of NR cells / EN-DC CR

revised to R5-185089

Intertek 38.523-1 15.0.0 CR#49 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184662 Update to Annex G for V2V/V2X Demod Perf tests CR

revised to R5-185357

Qualcomm Wireless GmbH 36.521-1 15.2.0 CR#4445 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

revised [WTS] [JSN]
R5-184663 Corrections to MCPTT Authorization CR

revised to R5-185122

MCC TF160 36.579-1 13.1.0 CR#7 catF TEI13_Test, MCPTT-ConTest Rel-13 R5-80

AI: 6.5.9.1

revised [WTS] [JSN]
R5-184664 Default channel bandwidth of new NR bands for non-CA signaling test cases discussion

revised to R5-185027

DOCOMO Communications Lab., KDDI Corporation, KT Corp. R5-80

AI: 6.3.13.19

revised [WTS] [JSN]
R5-184665 Flexible loop nest for FR2 TRx tests pCR Anritsu 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

withdrawn [WTS] [JSN]
R5-184666 MCPTT Client test cases: open issues in prose discussion MCC TF160 R5-80

AI: 6.5.9.14

noted [WTS] [JSN]
R5-184667 Correction to LAA inter-frequency event-triggered reporting test cases CR Qualcomm Wireless GmbH 36.521-3 15.2.1 CR#2268 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184668 Editorial correction of reference document CR Intertek 36.508 15.2.0 CR#1195 catF TEI8_Test Rel-15 R5-80

AI: 6.4.1

agreed [WTS] [JSN]
R5-184669 Clarification on frame structure in 4Rx performance and CSI test principles sections CR

revised to R5-185530

Qualcomm Wireless GmbH 36.521-1 15.2.0 CR#4446 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.2

revised [WTS] [JSN]
R5-184670 CR of AM RLC test case 7.1.2.3.10 CR

revised to R5-185090

Huawei, Hisilicon 38.523-1 15.0.0 CR#50 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184671 Update of References in Section 2 of 38.521-3 spec pCR Qualcomm Wireless GmbH 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-184672 Updates to Operating Bands in Section 5.2 pCR Qualcomm Wireless GmbH 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-184673 Editorial updates to 38.509 CR

revised to R5-185057

Samsung, MCC TF160 38.509 15.0.0 CR#1 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.3

revised [WTS] [JSN]
R5-184674 Specifying content for SCGFailureInformationNR CR

revised to R5-185103

Samsung 36.508 15.2.0 CR#1196 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.

revised [WTS] [JSN]
R5-184675 Specifying content for MeasResultSCG-Failure CR

revised to R5-185051

Samsung 38.508-1 15.0.0 CR#73 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184676 Update of RRC SCG failure TC 8.2.5.1.1 CR

revised to R5-185091

Samsung, Qualcomm 38.523-1 15.0.0 CR#51 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184677 Update of RRC SCG failure TC 8.2.5.2.1 CR

revised to R5-185092

Samsung, Qualcomm 38.523-1 15.0.0 CR#52 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184678 Update of RRC SCG failure TC 8.2.5.3.1 CR

revised to R5-185093

Samsung, Qualcomm 38.523-1 15.0.0 CR#53 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184679 Update of RRC SCG failure TC 8.2.5.4.1 CR

revised to R5-185094

Samsung, Qualcomm 38.523-1 15.0.0 CR#54 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184680 Update of RRC SCG failure TC 8.2.5.5.1 CR Samsung, Qualcomm 38.523-1 15.0.0 CR#55 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184681 Update of RRC SCG failure TC 8.2.5.6.1 CR Samsung, Qualcomm 38.523-1 15.0.0 CR#56 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184682 Update of test case title for TC 8.2.5.1.1 CR Samsung 38.523-2 15.0.0 CR#4 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.5

agreed [WTS] [JSN]
R5-184683 5G work planning after RAN5#80 other Samsung 5GS_NR_LTE-UEConTest R5-80

AI: 7.5

withdrawn [WTS] [JSN]
R5-184684 Update of PRD13 other Samsung R5-80

AI: 7.3

approved [WTS] [JSN]
R5-184685 Update of default message contents for new Rel-14 TCs for Private Call Call-Back and Ambient listening call CR Samsung 36.579-1 13.1.0 CR#8 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.1

agreed [WTS] [JSN]
R5-184686 Adding a new Rel-14 TC on Private Call Call-Back Request / Client Originated (CO) / Private call call-back fulfilment CR

revised to R5-185123

Samsung 36.579-2 13.1.0 CR#10 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.2

revised [WTS] [JSN]
R5-184687 Adding a new Rel-14 TC on Private Call Call-Back Request / Client Terminated (CT) / Private call call-back fulfilment CR Samsung 36.579-2 13.1.0 CR#11 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.2

agreed [WTS] [JSN]
R5-184688 Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Originated (CO) CR

revised to R5-185124

Samsung 36.579-2 13.1.0 CR#12 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.2

revised [WTS] [JSN]
R5-184689 Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Terminated (CT) CR Samsung 36.579-2 13.1.0 CR#13 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.2

agreed [WTS] [JSN]
R5-184690 Adding a new Rel-14 TC on Private Call / Locally initiated Ambient listening call / Client Originated (CO) CR Samsung 36.579-2 13.1.0 CR#14 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.2

agreed [WTS] [JSN]
R5-184691 Adding a new Rel-14 TC on Private Call / Locally initiated Ambient listening call / Client Terminated (CT) CR Samsung 36.579-2 13.1.0 CR#15 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.2

agreed [WTS] [JSN]
R5-184692 Editorial updates to 36.579-2 Rel-13 TCs CR Samsung 36.579-2 13.1.0 CR#16 catF TEI13_Test, MCPTT-ConTest Rel-13 R5-80

AI: 6.5.9.2

agreed [WTS] [JSN]
R5-184693 Adding applicability for new MCPTT Rel-14 TCs CR Samsung 36.579-4 13.1.0 CR#2 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.4

agreed [WTS] [JSN]
R5-184694 eLAA: Updates to Adjacent Channel Leakage power Ratio for CA CR

revised to R5-185433

Qualcomm Europe Inc. (Spain) 36.521-1 15.2.0 CR#4447 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 5.3.7.2

revised [WTS] [JSN]
R5-184695 Resubmission of update of TC8.13.3.6.1 and 8.13.3.6.2 CR ETSI MCC (TTA) 36.521-1 15.2.0 CR#4448 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.2

agreed [WTS] [JSN]
R5-184696 EN-DC Test Model: Addition of further aspects CR MCC TF160 38.523-3 15.0.0 CR#3 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.6

agreed [WTS] [JSN]
R5-184697 New UL 256QAM test case: 6.6.2.2_2 Additional Spectrum Emission Mask for UL 256QAM CR

revised to R5-185427

Ericsson 36.521-1 15.2.0 CR#4449 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

revised [WTS] [JSN]
R5-184698 Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 CR Ericsson 36.521-1 15.2.0 CR#4450 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.3

withdrawn [WTS] [JSN]
R5-184699 Addition of PICS CR

revised to R5-185161

Motorola Mobility 38.508-2 15.0.0 CR#1 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.2

revised [WTS] [JSN]
R5-184700 Addition of Test Loop for SDAP testing CR

revised to R5-185058

Motorola Mobility 38.509 15.0.0 CR#2 catB 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.3

revised [WTS] [JSN]
R5-184701 Addition of RLC Config for UM CR Motorola Mobility 38.508-1 15.0.0 CR#74 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

withdrawn [WTS] [JSN]
R5-184702 Addition of 5GS NR SDAP test case 7.1.4.2 CR

revised to R5-185095

Motorola Mobility 38.523-1 15.0.0 CR#57 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184703 MU budget for EIRP/TRP measurements with Near Field test range at mmWave discussion MVG Industries 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

withdrawn [WTS] [JSN]
R5-184704 Update to IMS eCall test cases for eCall category bit usage CR Qualcomm Incorporated 34.229-1 14.3.0 CR#1292 catF TEI14_Test, EIEI-UEConTest Rel-14 R5-80

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-184705 Update to Emergency Call test case 19.1.3 for eCall category bit usage CR

revised to R5-185087

Qualcomm Incorporated 34.229-1 14.3.0 CR#1293 catF TEI9_Test Rel-14 R5-80

AI: 6.5.6.1

revised [WTS] [JSN]
R5-184706 Editorial correction to band representation of non-contiguous EN-DC band combination CR

revised to R5-185052

Keysight Technologies UK Ltd 38.508-1 15.0.0 CR#75 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184707 Update of EMM test case 9.2.1.1.1b CR Qualcomm Incorporated 36.523-1 15.2.0 CR#4618 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.4

agreed [WTS] [JSN]
R5-184708 Update of EMM test case 9.2.1.1.22 CR Qualcomm Incorporated, Anritsu 36.523-1 15.2.0 CR#4619 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.4

agreed [WTS] [JSN]
R5-184709 Update of EMM test case 9.2.3.2.17 CR

revised to R5-185010

Qualcomm Incorporated 36.523-1 15.2.0 CR#4620 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.4

revised [WTS] [JSN]
R5-184710 Update of eMBMS test cases for UEs supporting AT command for eMBMS service activation CR Qualcomm Incorporated 36.523-1 15.2.0 CR#4621 catF TEI9_Test Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-184711 Update to NB-IOT test case 22.1.1 M2 CR

revised to R5-185019

Qualcomm Incorporated, Anritsu, Rohde & Schwarz 36.523-1 15.2.0 CR#4622 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

revised [WTS] [JSN]
R5-184712 Update to NB-IOT test case 22.3.1.2 CR

revised to R5-185020

Qualcomm Incorporated 36.523-1 15.2.0 CR#4623 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

revised [WTS] [JSN]
R5-184713 Correction to RLC-Config IE CR

revised to R5-185053

Ericsson 38.508-1 15.0.0 CR#76 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184714 Correction to RadioBearerConfig-DRB CR

revised to R5-185054

Ericsson 38.508-1 15.0.0 CR#77 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184715 Corrections ard updates to BandCombinationList and Feature Set IEs CR

revised to R5-185055

Ericsson 38.508-1 15.0.0 CR#78 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184716 Addition of RRM IncMon new Test Case 8.5.8 CR

revised to R5-185459

Ericsson 36.521-3 15.2.1 CR#2269 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184717 Addition of RRM IncMon new Test Case 8.6.3 CR

revised to R5-185460

Ericsson 36.521-3 15.2.1 CR#2270 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184718 Addition of RRM IncMon new Test Case 8.7.5 CR

revised to R5-185461

Ericsson 36.521-3 15.2.1 CR#2271 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184719 Addition of RRM IncMon new Test Case 8.7A.1 CR

revised to R5-185462

Ericsson 36.521-3 15.2.1 CR#2272 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184720 Addition of RRM IncMon new Test Cases 4.2.1 and 4.2.11 CR

revised to R5-185463

Ericsson 36.521-3 15.2.1 CR#2273 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184721 Addition of RRM IncMon new Test Case 4.3.1.5 CR

revised to R5-185464

Ericsson 36.521-3 15.2.1 CR#2274 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184722 Addition of RRM IncMon new Test Case 4.3.2A CR

revised to R5-185465

Ericsson 36.521-3 15.2.1 CR#2275 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184723 Addition of RRM IncMon new Test Case 4.3.3A CR

revised to R5-185466

Ericsson 36.521-3 15.2.1 CR#2276 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184724 Addition of RRM IncMon new Test Case 4.3.4.4 CR

revised to R5-185467

Ericsson 36.521-3 15.2.1 CR#2277 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

revised [WTS] [JSN]
R5-184725 Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 CR

revised to R5-185428

Ericsson 36.521-2 15.2.0 CR#755 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.3

revised [WTS] [JSN]
R5-184726 Removal of 1xPre-Registation 8.4.7.x test cases CR Qualcomm Incorporated 36.523-1 15.2.0 CR#4624 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.3.4

agreed [WTS] [JSN]
R5-184727 Removal of Multi-Layer 1xPre-Registation 13.4.4.x and 1xCSFB 13.1.xx test cases CR Qualcomm Incorporated 36.523-1 15.2.0 CR#4625 catF TEI9_Test Rel-15 R5-80

AI: 6.4.3.8

agreed [WTS] [JSN]
R5-184728 Update of TC7.6.2G.1 Out-of-band blocking for V2X Communication CR CAICT 36.521-1 15.2.0 CR#4451 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-184729 Update of TC 7.8.1G.1 Wide band Intermodulation for V2X CR CAICT 36.521-1 15.2.0 CR#4452 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-184730 Correction to Inter-RAT absolute priority based reselection test cases CR Qualcomm Incorporated 36.523-2 15.2.0 CR#1202 catF TEI11_Test Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184731 Update to applicability condition of test case 11.2.3 to include CSG PICS CR Qualcomm Incorporated 36.523-2 15.2.0 CR#1203 catF TEI9_Test Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184732 Update to applicability condition of Intra-frequency measurement reporting test cases for CAT-M1 UEs CR

revised to R5-185137

Qualcomm Incorporated 36.523-2 15.2.0 CR#1204 catF TEI8_Test Rel-15 R5-80

AI: 6.4.4

revised [WTS] [JSN]
R5-184733 Update of TC7.9G Spurious emissions for V2X CR CAICT 36.521-1 15.2.0 CR#4453 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-184734 Update to applicability condition of Test case 6.1.1.7a for CAT-M1 UEs CR Qualcomm Incorporated, Rohde & Schwarz 36.523-2 15.2.0 CR#1205 catF TEI10_Test Rel-15 R5-80

AI: 6.4.4

withdrawn [WTS] [JSN]
R5-184735 Removal of 1xPre-Registation and 1xCSFB test cases applicability CR

revised to R5-185138

Qualcomm Incorporated 36.523-2 15.2.0 CR#1206 catF TEI8_Test Rel-15 R5-80

AI: 6.4.4

revised [WTS] [JSN]
R5-184736 Introduce Intra frequency handover for Cat-M2 UEs in CEModeA CR Bureau Veritas 36.521-3 15.2.1 CR#2278 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.4

withdrawn [WTS] [JSN]
R5-184737 Dual uplink interferer updated to 38.521-3 pCR Bureau Veritas 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-184738 pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave pCR

revised to R5-185352

MVG Industries 38.903 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

revised [WTS] [JSN]
R5-184739 Update of UE test loop mode E CR

revised to R5-185129

Huawei,HiSilicon, CATT 36.509 15.0.0 CR#196 catA LTE_V2X-UEConTest Rel-15 R5-80

AI: 4.5.1

revised [WTS] [JSN]
R5-184740 Update of multiple V2V RF test cases for proper test mode setting CR

revised to R5-185358

Huawei,HiSilicon 36.521-1 15.2.0 CR#4454 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

revised [WTS] [JSN]
R5-184741 Discussion on starting point of 200ms in FR1 RF test procedures discussion

revised to R5-185306

Huawei,HiSilicon, Keysight 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184742 Update of FR2 test case 6.3.1 pCR Huawei,HiSilicon 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-184743 Update of FR2 test case 6.3.3.2 pCR Huawei,HiSilicon 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-184744 Addition of 6.2B.4.1.1 Configured OP for Intra-Band Contiguous EN-DC pCR

revised to R5-185332

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184745 Addition of 6.2B.4.1.2 Configured OP for Intra-Band Non-Contiguous EN-DC pCR

revised to R5-185333

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184746 Addition of 6.2B.4.1.3 Configured OP for Intre-Band within FR1 pCR

revised to R5-185507

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184747 Addition of 6.2B.4.1.4 Configured OP for Inter-Band EN-DC including FR2 pCR

revised to R5-185198

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184748 Addition of 6.2B.4.1.5 Configured OP for Inter-Band EN-DC including both FR1 and FR2 pCR

revised to R5-185199

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184749 Revised WID- Support for V2X services WID revised Huawei LTE_V2X-UEConTest Rel-14 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184750 Draft TR 38.905-1 v0.3.0 draft TR Ericsson LM 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

withdrawn [WTS] [JSN]
R5-184751 TP for updating TR38.905 with FR1 AMPR test point analyses with NS_35 pCR

revised to R5-185307

Ericsson LM 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-184752 Discussion on test point selection for NS_35 A-MPR in FR1 discussion Ericsson LM R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184753 Update of NR test cases title and applicability CR

revised to R5-185157

Qualcomm Incorporated 38.523-2 15.0.0 CR#5 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.5

revised [WTS] [JSN]
R5-184754 TP for updating test case 6.2.3 UE AMPR pCR

revised to R5-185408

Ericsson LM 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184755 TP for updating test case 6.5.2.3 Additional spectrum emission mask pCR Ericsson LM 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

withdrawn [WTS] [JSN]
R5-184756 Correction to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC CR

revised to R5-185154

Qualcomm Incorporated 38.523-1 15.0.0 CR#58 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184757 TP for updating test case 6.2B.3.1 UE AMPR for Intra-band contigous EN-DC pCR

revised to R5-185469

Ericsson LM 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184758 TP for updating test case 6.2B.3.2 UE AMPR for Intra-band non-contigous EN-DC pCR

revised to R5-185470

Ericsson LM 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184759 TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC pCR

revised to R5-185471

Ericsson LM 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184760 Correction to RRC TC - PSCell addition, modification and release / Split DRB / EN-DC CR Qualcomm Incorporated 38.523-1 15.0.0 CR#59 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184761 Correction to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of NR cells / EN-DC CR Qualcomm Incorporated 38.523-1 15.0.0 CR#60 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184762 Aligning CA delta TiB in sub-clause 6.2.5.3 with TS 36.101 v15.3.0 CR Ericsson LM 36.521-1 15.2.0 CR#4455 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-184763 Correction to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / RSRQ based measurements / EN-DC CR Qualcomm Incorporated 38.523-1 15.0.0 CR#61 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184764 Aligning CA delta RiB in sub-clause 7.3.3 with TS 36.101 v15.3.0 CR Ericsson LM 36.521-1 15.2.0 CR#4456 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-184765 Introduction CA_3A-7A-20A-32A 4DL/1UL to Annex A CR Ericsson LM 36.521-2 15.2.0 CR#756 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-184766 Optimization of test configuration table for Rx CA test cases discussion

revised to R5-185513

NTT DOCOMO, INC. LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.11

revised [WTS] [JSN]
R5-184767 Updates to NAS test case 10.2.1.2 CR

revised to R5-185155

Ericsson LM 38.523-1 15.0.0 CR#62 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184768 Update of 5GS NR RRC test case 8.2.2.6.1 CR ROHDE & SCHWARZ 38.523-3 15.0.0 CR#4 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-184769 Update of 5GS NR RRC test case 8.2.2.6.1 CR ROHDE & SCHWARZ 38.523-1 15.0.0 CR#63 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-184770 Update of 5GS NR RRC test case 8.2.3.6.1 CR

revised to R5-185096

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#64 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184771 Addition of test frequencies for CA_66A-71A, CA_66C-71A, CA_70A-71A, CA_70C-71A to 36.508 CR WE Certification Oy, DISH Network 36.508 15.2.0 CR#1197 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 6.3.17.1

agreed [WTS] [JSN]
R5-184772 Addition of new 5GC TC 9.1.2.2 CR CATT, TDIA 38.523-1 15.0.0 CR#65 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-184773 RF TP analysis for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A CR WE Certification Oy, DISH Network 36.905 15.1.0 CR#152 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.

agreed [WTS] [JSN]
R5-184774 Update of 5GS NR RRC test case 8.2.3.8.1 CR

revised to R5-185097

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#66 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184775 Reference sensitivity requirements for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A CR

revised to R5-185174

WE Certification Oy, DISH Network 36.521-1 15.2.0 CR#4457 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

revised [WTS] [JSN]
R5-184776 Updates to Align Initial Conditions with Other V2X Test Cases CR

revised to R5-185371

PCTEST Engineering Lab 36.521-1 15.2.0 CR#4458 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184777 Update of 5GS NR RRC test case 8.2.1.1.1 CR

revised to R5-185098

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#67 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184778 Updates to Align the GNSS Moving Scenario Details with Other V2X Test Cases CR PCTEST Engineering Lab 36.523-1 15.2.0 CR#4626 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-184779 Update to A.2.1 for Test eCall Request-URI CR Qualcomm Incorporated 34.229-1 14.3.0 CR#1294 catF TEI14_Test, EIEI-UEConTest Rel-14 R5-80

AI: 6.5.6.1

withdrawn [WTS] [JSN]
R5-184780 Update of applicability and tests conditions for NB_IOT enhancement test cases CR CATT, TDIA, Starpoint 36.523-2 15.2.0 CR#1207 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.4

agreed [WTS] [JSN]
R5-184781 Update to IMS eCall test case 11.3.2 CR Qualcomm Incorporated 36.523-1 15.2.0 CR#4627 catF TEI14_Test, EIEI-UEConTest Rel-15 R5-80

AI: 6.4.3.6

withdrawn [WTS] [JSN]
R5-184782 Update to IMS eCall test case 11.3.6 CR Qualcomm Incorporated 36.523-1 15.2.0 CR#4628 catF TEI14_Test, EIEI-UEConTest Rel-15 R5-80

AI: 6.4.3.6

withdrawn [WTS] [JSN]
R5-184783 Introduce 5GMM messages CR Ericsson 38.508-1 15.0.0 CR#79 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-184784 Addition of new NB_IOTenh-UEConTest test case 22.3.1.8 CR

revised to R5-185116

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#4629 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

revised [WTS] [JSN]
R5-184785 Introduce 5GSM messages CR Ericsson 38.508-1 15.0.0 CR#80 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-184786 Addition of new NB_IOTenh-UEConTest test case 22.3.1.9 CR CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#4630 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-184787 Addition of new NB_IOTenh-UEConTest test case 22.3.1.10 CR

revised to R5-185117

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#4631 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

revised [WTS] [JSN]
R5-184788 Addition of new NB_IOTenh-UEConTest test case 22.4.24 CR

revised to R5-185118

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#4632 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

revised [WTS] [JSN]
R5-184789 Addition of new NB_IOTenh-UEConTest test case 22.4.25 CR

revised to R5-185119

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#4633 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

revised [WTS] [JSN]
R5-184790 Addition of new NB_IOTenh-UEConTest test case 22.4.25 CR CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#4634 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

withdrawn [WTS] [JSN]
R5-184791 Addition of NB_IOTenh-UEConTest test case scenarios and default SIB content CR

revised to R5-185113

CATT, TDIA, Starpoint 36.508 15.2.0 CR#1198 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.1

revised [WTS] [JSN]
R5-184792 Addition of reference dedicated EPS bearer context #7 for V2X testing CR CATT 36.523-1 15.2.0 CR#4635 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

withdrawn [WTS] [JSN]
R5-184793 Remove test step 0 in test case 24.1.15 CR CATT 36.523-1 15.2.0 CR#4636 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-184794 Remove test step 0 in test case 24.1.18 CR CATT 36.523-1 15.2.0 CR#4637 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-184795 Correction on V2X Sidelink test case 24.3.1 CR CATT 36.523-1 15.2.0 CR#4638 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-184796 Update Table 24.3.3.3.3-1 in test case 24.3.3 CR CATT 36.523-1 15.2.0 CR#4639 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-184797 Clarification for chapter 8 & 9 general sections CR Rohde & Schwarz 36.521-1 15.2.0 CR#4459 catF TEI14_Test Rel-15 R5-80

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-184798 Corrections to 4Rx demodulation TCs CR Rohde & Schwarz 36.521-1 15.2.0 CR#4460 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.2

withdrawn [WTS] [JSN]
R5-184799 Corrections to A-MPR values for NS_27 CR

revised to R5-185448

Rohde & Schwarz 36.521-1 15.2.0 CR#4461 catF TEI14_Test Rel-15 R5-80

AI: 5.4.1.2.1

revised [WTS] [JSN]
R5-184800 Update to test point analysis for NS_27 CR Rohde & Schwarz 36.905 15.1.0 CR#153 catF TEI14_Test Rel-15 R5-80

AI: 5.4.1.5.4

agreed [WTS] [JSN]
R5-184801 Discussion on UE device size for FR2 discussion Rohde & Schwarz 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184802 Discussion on treatment of multi-panel UEs discussion Rohde & Schwarz 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184803 Discussion on Test Tolerance for FR2 discussion

revised to R5-185534

Intel Corporation (UK) Ltd, Apple Inc. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184804 Discussion on TT for Max Output Power TC Requirements for FR2 discussion

revised to R5-185566

Intel Corporation (UK) Ltd, Apple Inc. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184805 Discussion on SIG testcase optimization of 5GC discussion CATT R5-80

AI: 6.3.13.19

noted [WTS] [JSN]
R5-184806 Mid test CH BW for n71 CR Dish Network 38.508-1 15.0.0 CR#81 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-184807 Correction to NB-IoT testcase 22.3.3.5 CR

revised to R5-185021

ROHDE & SCHWARZ 36.523-1 15.2.0 CR#4641 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

revised [WTS] [JSN]
R5-184808 Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2 CR

revised to R5-185549

Intel Corporation (UK) Ltd 36.521-2 15.2.0 CR#757 catF TEI14_Test Rel-15 R5-80

AI: 5.4.1.3

revised [WTS] [JSN]
R5-184809 Correction to Applicability Condition of TS 36.521-1 Test Cases 6.6.2.2A.1 and 6.6.3.3A.1 CR Intel Corporation (UK) Ltd 36.521-2 15.2.0 CR#758 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-184810 FR2_UE_BeamlockInvoke_38.521-3 pCR

revised to R5-185556

Qualcomm Europe Inc. (Spain) 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184811 Correction to Note 1 of Table 7.3A.0-0bB Reference sensitivity level for CA CR Intel Corporation (UK) Ltd 36.521-1 15.2.0 CR#4462 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-184812 Correction to Power Control for CA Test Procedure of TCs 6.3.5A.1.1, 6.3.5A.1.2 and 6.3.5A.1.4 CR Intel Corporation (UK) Ltd 36.521-1 15.2.0 CR#4463 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-184813 New test case for V2X Sidelink using Tx parameters based on measured CBR and PPPP CR

revised to R5-185110

Sporton, TTA 36.523-1 15.2.0 CR#4642 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

revised [WTS] [JSN]
R5-184814 Addition of test applicability for new V2X TC 24.1.13 CR Sporton 36.523-2 15.2.0 CR#1208 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.4

agreed [WTS] [JSN]
R5-184815 New test case for NB-IoT UM RLC CR

revised to R5-185120

Sporton, TTA, TDIA 36.523-1 15.2.0 CR#4643 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

revised [WTS] [JSN]
R5-184816 Addition of applicability and tests conditions for new Enhancements NB-IoT TC 24.1.13 CR Sporton 36.523-2 15.2.0 CR#1209 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.4

withdrawn [WTS] [JSN]
R5-184817 Making Measurement Uncertainty Terms Common between methods in TR 38.90 discussion MVG Industries 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

withdrawn [WTS] [JSN]
R5-184818 Correction to Message Content for TC 6.2.4EA A-MPR for UE Category M1 CR Intel Corporation (UK) Ltd 36.521-1 15.2.0 CR#4464 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-184819 pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 pCR

revised to R5-185213

MVG Industries 38.903 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

revised [WTS] [JSN]
R5-184820 Addition of default laa-SCellConfiguration setting for eLAA CR Huawei, MCC TF160 36.508 15.2.0 CR#1199 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 6.3.7.1

agreed [WTS] [JSN]
R5-184821 Inter-band con-current V2X configurations- Updates of test points analysis CR Huawei, Hisilicon 36.905 15.1.0 CR#154 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.8

agreed [WTS] [JSN]
R5-184822 Addition of notes for half pi-BPSK test applicability pCR Huawei, Hisilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-184823 Introduction of 6.2C.1 Configured transmitted power for SUL pCR

revised to R5-185446

Huawei, Hisilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184824 Addition of Uplink Physical Channels in Annex pCR

revised to R5-185324

Huawei, Hisilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184825 Addition of downlink physicanl channels in annex pCR Huawei, Hisilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

withdrawn [WTS] [JSN]
R5-184826 Update of TC 6.2B.1.1 pCR

revised to R5-185472

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184827 Introduction of TC 6.2B.1.2 pCR

revised to R5-185473

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184828 Update of 6.2B.1.3 pCR

revised to R5-185474

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184829 Introduction of TC 7.4B.1 pCR

revised to R5-185475

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184830 Introduction of 7.4B.2 pCR

revised to R5-185476

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184831 Introduction of 7.4B.3 pCR

revised to R5-185477

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184832 Addition of Test point and test requirements for CA_3A-41A, 41A-42A,3A-42A spurious test cases CR Huawei, Hisilicon 36.521-1 15.2.0 CR#4465 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184833 Test point and test requirements analysis for CA_3A-41A, 41A-42A,3A-42A spurious test cases CR

revised to R5-185437

Huawei, Hisilicon 36.905 15.1.0 CR#155 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.

revised [WTS] [JSN]
R5-184834 Discussion on the test applicability for the modulation of Pi/2-BPSK discussion

revised to R5-185308

Huawei, Hisilicon 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184835 Discussion on test point selection for Configured transmitted power for SUL test case in FR1 discussion Huawei, Hisilicon 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184836 Correction to Reference sensitivity level for CA UL Allocation in Table 7.3A.1.4.1-1 CR Intel Corporation (UK) Ltd 36.521-1 15.2.0 CR#4466 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.2.2

withdrawn [WTS] [JSN]
R5-184837 Test Point analysis for FR1 Configured Output Power for SUL pCR

revised to R5-185309

Huawei,HiSilicon 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-184838 Addition of new CA band combination – Updates of test points analysis CR

revised to R5-185502

SGS Wireless 36.905 15.1.0 CR#156 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.

revised [WTS] [JSN]
R5-184839 Update of TDD PDSCH Closed Loop Multi Layer Multiplexing 4x2 for CA (5DL CA) CR SGS Wireless 36.521-1 15.2.0 CR#4467 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-184840 Update of TX Minimum Ouput Power for CA (3UL CA) CR SGS Wireless 36.521-1 15.2.0 CR#4468 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184841 Introduction of Additional Maximum Power Reduction (A-MPR) for CA (3UL CA) CR

revised to R5-185508

SGS Wireless 36.521-1 15.2.0 CR#4469 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184842 Introduction of Maximum Power Reduction (MPR) for CA (3UL CA) CR SGS Wireless 36.521-1 15.2.0 CR#4470 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-184843 Introduction of General ON/OFF time mask for CA (3UL CA) CR

revised to R5-185509

SGS Wireless 36.521-1 15.2.0 CR#4471 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184844 Addition of new 2CA band combination for CA REFSENS CR SGS Wireless 36.521-1 15.2.0 CR#4472 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-184845 Addition of new 3CA band combination for CA REFSENS CR

revised to R5-185506

SGS Wireless 36.521-1 15.2.0 CR#4473 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

revised [WTS] [JSN]
R5-184846 Additional of test applicability for CA (3UL CA) CR SGS Wireless 36.521-2 15.2.0 CR#759 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.3

withdrawn [WTS] [JSN]
R5-184847 Update of V2X RRM CR

revised to R5-185373

SGS Wireless 36.521-3 15.2.1 CR#2279 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

revised [WTS] [JSN]
R5-184848 Update of V2X Receiver Test Cases CR

revised to R5-185372

SGS Wireless 36.521-1 15.2.0 CR#4474 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

revised [WTS] [JSN]
R5-184849 Correction of condition for Measurement configuration and reporting CR SGS Wireless, Ericsson 36.523-2 15.2.0 CR#1210 catF TEI9_Test Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-184850 Update of Initial condition for FR2 pCR SGS Wireless 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

withdrawn [WTS] [JSN]
R5-184851 Introduction of OTA signaling test environment CR

revised to R5-185168

Keysight Technologies UK Ltd, Anritsu Ltd 38.508-1 15.0.0 CR#82 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184852 Discussion on OBW, SEM and ACLR for EN-DC interband FR1 discussion

revised to R5-185478

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184853 Correction to NR RRC test case 8.2.3.14.1 CR Keysight Technologies UK Ltd 38.508-1 15.0.0 CR#83 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-184854 Correction to NB-IoT testcase 22.3.2.2 CR ROHDE & SCHWARZ 36.523-1 15.2.0 CR#4644 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-184855 Update Occupied Bandwidth for interband EN-DC within FR1 pCR

revised to R5-185479

Keysight Technologies UK Ltd 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184856 General sections updated to 38.521-2 pCR CAICT 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-184857 Update SEM interband EN-DC within FR1 pCR

revised to R5-185480

Keysight Technologies UK Ltd 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184858 Quality of Quiet Zone Results for IFF other

revised to R5-185492

Keysight Technologies UK Ltd R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184859 5G_NR FR1_Text_update for_RX_sensitivity pCR

revised to R5-185447

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184860 Update ACLR for interband EN-DC within FR1 pCR

revised to R5-185481

Keysight Technologies UK Ltd 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184861 WP – UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE Work Plan Intel Corporation (UK) Ltd LTE_IM_DLCCH-UEConTest Rel-13 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184862 SR- UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE WI status report Intel Corporation (UK) Ltd LTE_IM_DLCCH-UEConTest Rel-13 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184863 Update of FR1 test case 6.2.2 pCR

revised to R5-185411

CAICT 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184864 WP – UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Enhancements Work Plan Intel Corporation (UK) Ltd LTE_WLAN_radio-UEConTest Rel-13 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184865 5G NR_FR1_Text_update for TX Spurious Emission pCR

revised to R5-185413

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184866 SR- UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Enhancements WI status report Intel Corporation (UK) Ltd LTE_WLAN_radio-UEConTest Rel-13 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184867 5G NR_FR1_Text_update for TX Spurious Emission UE-Co-exist pCR

revised to R5-185496

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184868 New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes CR

revised to R5-185544

Intel Corporation (UK) Ltd 36.521-3 15.2.1 CR#2280 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

revised [WTS] [JSN]
R5-184869 5G NR_EN_DC with FR1_Text update for RX sensitivity pCR

revised to R5-185482

Qualcomm Incorporated 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184870 New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes CR

revised to R5-185545

Intel Corporation (UK) Ltd 36.521-3 15.2.1 CR#2281 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

revised [WTS] [JSN]
R5-184871 New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes CR

revised to R5-185546

Intel Corporation (UK) Ltd 36.521-3 15.2.1 CR#2282 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

revised [WTS] [JSN]
R5-184872 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission pCR

revised to R5-185487

Qualcomm Incorporated 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184873 New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes CR

revised to R5-185547

Intel Corporation (UK) Ltd 36.521-3 15.2.1 CR#2283 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

revised [WTS] [JSN]
R5-184874 TS 36.521-1 Annex F update for UE cat 1bis test cases CR

revised to R5-185377

Qualcomm Incorporated 36.521-1 15.2.0 CR#4475 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

revised [WTS] [JSN]
R5-184875 Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-1 pCR

revised to R5-185414

Keysight Technologies UK Ltd 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184876 LTE_New test case LTE_New test case 6.3.4EB ONOFF time mask for UE category 1bis CR

revised to R5-185378

Qualcomm Incorporated 36.521-1 15.2.0 CR#4476 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

revised [WTS] [JSN]
R5-184877 LTE_New test case 6.3.5EB Power Control for UE category 1bis CR

revised to R5-185379

Qualcomm Incorporated 36.521-1 15.2.0 CR#4477 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

revised [WTS] [JSN]
R5-184878 LTE_New test case 6.3.3EB UE Transmit OFF power for UE category 1bis CR

revised to R5-185382

Qualcomm Incorporated 36.521-1 15.2.0 CR#4478 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

revised [WTS] [JSN]
R5-184879 LTE_New test case 6.3.2EB Minimum Output Power for UE category 1bis CR

revised to R5-185380

Qualcomm Incorporated 36.521-1 15.2.0 CR#4479 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

revised [WTS] [JSN]
R5-184880 LTE_New test case 6.2.5EB Configured UE transmitted Power for UE category 1bis CR

revised to R5-185383

Qualcomm Incorporated 36.521-1 15.2.0 CR#4480 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

revised [WTS] [JSN]
R5-184881 LTE_New test case 6.2.4EB Additional Maximum Power Reduction (A-MPR) for UE category 1bis CR

revised to R5-185381

Qualcomm Incorporated 36.521-1 15.2.0 CR#4481 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

revised [WTS] [JSN]
R5-184882 Alignment of Annex numbering with core spec pCR

revised to R5-185422

Qualcomm Wireless GmbH 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-184883 Proposal for 5G NR EVM Test Tolerance discussion

revised to R5-185532

Qualcomm Incorporated R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184884 Update to NB-IoT test conditions for in-band / guard band CR ROHDE & SCHWARZ 36.508 15.2.0 CR#1200 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.1

agreed [WTS] [JSN]
R5-184885 LTE_New test case 6.2.3EB Maximum Power Reduction (MPR) for UE category 1bis CR

revised to R5-185384

Qualcomm Incorporated 36.521-1 15.2.0 CR#4482 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

revised [WTS] [JSN]
R5-184886 LTE_New test case 6.2.2EB UE Maximum Output Power for UE category 1bis CR Qualcomm Incorporated 36.521-1 15.2.0 CR#4483 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-184887 On the relation between MU and TT for RF and RRM conformance testing discussion Ericsson 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184888 Introduction of maximum output power test cases pCR Ericsson 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

withdrawn [WTS] [JSN]
R5-184889 Discussion on testing of fallback CA configurations in Rx CA test cases discussion

revised to R5-185550

Ericsson TEI10_Test Rel-15 R5-80

AI: 5.4.1.11

revised [WTS] [JSN]
R5-184890 Test optimization for CA fallback cases in 3DL CA and 4DL CA Receiver test cases CR Ericsson 36.521-2 15.2.0 CR#760 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.3

withdrawn [WTS] [JSN]
R5-184891 4Rx support in some 4DL CA and 5DL CA Demodulation test cases CR

revised to R5-185186

Ericsson 36.521-1 15.2.0 CR#4484 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.2.3

revised [WTS] [JSN]
R5-184892 4Rx branches in some 4DL CA and 5DL CA Demodulation test cases CR Ericsson 36.521-2 15.2.0 CR#761 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-184893 WP UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports Work Plan Ericsson LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184894 SR UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports WI status report Ericsson LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184895 WP UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE Work Plan Ericsson LTE_EBF_FDMIMO-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184896 SR UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE WI status report Ericsson LTE_EBF_FDMIMO-UEConTest Rel-15 R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184897 Updates to Channel Arrangement section in 38.521-3 pCR Qualcomm Wireless GmbH 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-184898 Proposal for LTE 256QAM EVM Test Tolerance discussion

revised to R5-185553

Qualcomm Incorporated R5-80

AI: 5.4.1.2

revised [WTS] [JSN]
R5-184899 WP UE Conformance Test Aspects – Further enhanced MTC for LTE Work Plan Ericsson LTE_feMTC-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184900 SR UE Conformance Test Aspects – Further enhanced MTC for LTE WI status report Ericsson LTE_feMTC-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184901 Updates to feMTC TC 8.2.2.6.6 CR Ericsson 36.523-2 15.2.0 CR#1211 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 6.3.16.3

withdrawn [WTS] [JSN]
R5-184902 Corrections and updates to UE Capability IEs CR

revised to R5-185056

Ericsson 38.508-1 15.0.0 CR#84 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-184903 Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 CR CGC Inc. 36.521-2 15.2.0 CR#762 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.3

withdrawn [WTS] [JSN]
R5-184904 Update to ACS and in-band blocking test cases in TS 38.521-1 pCR

revised to R5-185415

Keysight Technologies UK Ltd 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184905 Add a new test condition for test case 8.13.3.1.2.5. CR

revised to R5-185376

CGC Inc. 36.521-2 15.2.0 CR#763 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.3

revised [WTS] [JSN]
R5-184906 Add 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 in 36.521-2 CR CGC Inc. 36.521-2 15.2.0 CR#764 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.3

withdrawn [WTS] [JSN]
R5-184907 Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-2 pCR

revised to R5-185191

Keysight Technologies UK Ltd 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184908 FR2_UE_BeamlockMode_IE_38.509 CR

revised to R5-185523

Qualcomm Europe Inc. (Spain) 38.509 15.0.0 CR#3 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.3

revised [WTS] [JSN]
R5-184909 FR2_UE_BeamlockProcedure_38.508-1 CR

revised to R5-185557

Qualcomm Europe Inc. (Spain) 38.508-1 15.0.0 CR#85 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

revised [WTS] [JSN]
R5-184910 Discussion of test frequencies discussion Sprint Corporation LTE_CA_C_B41_PC2-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184911 Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. CR CGC Inc. 36.521-2 15.2.0 CR#765 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-184912 Update to ACS and inband blocking test cases in TS 38.521-2 pCR

revised to R5-185192

Keysight Technologies UK Ltd 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184913 Update MU factors for IFF pCR Keysight Technologies UK Ltd 38.903 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

withdrawn [WTS] [JSN]
R5-184914 Discussion on MU factor for IFF discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184915 Discussion on low-PSD scenarios discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184916 Discussion on Dwell time discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184917 Correction on 4Rx RLM TC in-sync parameters CR Qualcomm Wireless GmbH 36.521-3 15.2.1 CR#2284 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.4

agreed [WTS] [JSN]
R5-184918 Correction to multi-layer test case 13.1.20 CR Keysight Technologies UK Ltd 36.523-1 15.2.0 CR#4645 catF TEI9_Test Rel-15 R5-80

AI: 6.4.3.8

agreed [WTS] [JSN]
R5-184919 5G_FR1_Text_update for_RF_sensitivity_for_SUL_operation pCR

revised to R5-185325

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184920 5G NR_Proposal of TS38.521-1 annex C.0_Downlink signal levels pCR

revised to R5-185500

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184921 5G NR_FR1_Text_Update_for_TX_ Additional spurious emissions pCR

revised to R5-185501

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184922 Test Point Analysis for Reference sensitivity level for EN-DC discussion

revised to R5-185429

Qualcomm Incorporated R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184923 Test Point analysis for FR2 RefSense test case pCR Qualcomm Europe Inc. (Spain) 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-184924 Test Point analysis for FR2 TxSpurious test case pCR

revised to R5-185491

Qualcomm Europe Inc. (Spain) 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-184925 Test Tolerance: Updates to Cat1bis chapter 8 inter-frequency event triggered reporting tests CR Qualcomm UK Ltd 36.521-3 15.2.1 CR#2285 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

withdrawn [WTS] [JSN]
R5-184926 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis CR

revised to R5-185338

Qualcomm UK Ltd 36.903 14.1.0 CR#412 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184927 Test Tolerance: Updates to Cat1bis Event triggered reporting tests under AWGN propagation conditions in asynchronous cells with DRX when L3 filtering is used CR Qualcomm UK Ltd 36.521-3 15.2.1 CR#2286 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

withdrawn [WTS] [JSN]
R5-184928 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used CR

revised to R5-185339

Qualcomm UK Ltd 36.903 14.1.0 CR#413 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184929 Test Tolerance: Updates to Cat1bis Event triggered reporting tests with fading, Annex E and Annex F CR Qualcomm UK Ltd 36.521-3 15.2.1 CR#2287 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

withdrawn [WTS] [JSN]
R5-184930 Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis CR

revised to R5-185340

Qualcomm UK Ltd 36.903 14.1.0 CR#414 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184931 Test Tolerance: Updates to Cat1bis intra-frequency Event triggered reporting tests, Annex E and Annex F CR Qualcomm UK Ltd 36.521-3 15.2.1 CR#2288 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

withdrawn [WTS] [JSN]
R5-184932 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis CR

revised to R5-185341

Qualcomm UK Ltd 36.903 14.1.0 CR#415 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

revised [WTS] [JSN]
R5-184933 Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F CR Qualcomm UK Ltd 36.521-3 15.2.1 CR#2289 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

withdrawn [WTS] [JSN]
R5-184934 Test Tolerances analysis for E-UTRAN FDD and TDD Intra-frequency CGI TC 8.1.19_2, 8.1.20_2, 8.2.7_2, 8.2.8_2 for UE category 1bis CR Qualcomm UK Ltd 36.903 14.1.0 CR#416 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

withdrawn [WTS] [JSN]
R5-184935 Cat1bis new RF test case: Occupied bandwidth for UE category 1bis CR Qualcomm Austria 36.521-1 15.2.0 CR#4485 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-184936 Cat1bis new RF test case: Spectrum Emission Mask for UE category 1bis CR Qualcomm Austria 36.521-1 15.2.0 CR#4486 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-184937 Cat1bis new RF test case: Additional Spectrum Emission Mask for UE category 1bis CR Qualcomm Austria 36.521-1 15.2.0 CR#4487 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-184938 Cat1bis new RF test case: Adjacent Channel Leakage power Ratio for UE category 1bis CR Qualcomm Austria 36.521-1 15.2.0 CR#4488 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-184939 Cat1bis new RF test case: Spurious emission for UE category 1bis CR Qualcomm Austria 36.521-1 15.2.0 CR#4489 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-184940 Cat1bis new RF test case: Transmit intermodulation for UE category 1bis CR

revised to R5-185385

Qualcomm Austria 36.521-1 15.2.0 CR#4490 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

revised [WTS] [JSN]
R5-184941 Editorial correction of NS requirements CR ROHDE & SCHWARZ 36.521-1 15.2.0 CR#4491 catF TEI12_Test Rel-15 R5-80

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-184942 Update to carrier leakage test case in TS 38.521-1 pCR

revised to R5-185312

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184943 TP for updating TR 38.905 with FR1 Carrier Leakage test point analysis pCR

revised to R5-185311

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-184944 Discussion on test point selection for Carrier Leakage in FR1 discussion

revised to R5-185310

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184945 Update to EVM test case in TS 38.521-1 pCR

revised to R5-185326

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184946 TP for updating TR 38.905 with EVM test point analysis pCR

revised to R5-185412

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-184947 Update to EVM equalizer spectrum flatness test case in TS 38.521-1 pCR

revised to R5-185315

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184948 TP for updating TR 38.905 with FR1 EVM equalizer spectrum flatness test point analysis pCR

revised to R5-185314

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-184949 Discussion on test point selection for EVM equalizer spectrum flatness in FR1 discussion

revised to R5-185313

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184950 Update to Frequency Error test case in TS 38.521-1 pCR

revised to R5-185317

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184951 TP for updating TR 38.905 with FR1 Frequency Error test point analysis pCR

revised to R5-185316

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-184952 Discussion on test point selection for Frequency Error test case in FR1 discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-184953 Addition of Annex Global In-Channel TX-Test to 38.521-1 pCR

revised to R5-185327

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184954 Addition of Annex Global In-Channel TX-Test to 38.521-2 pCR

revised to R5-185353

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184955 Update to In-band Emissions test case in TS 38.521-1 pCR

revised to R5-185320

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

revised [WTS] [JSN]
R5-184956 TP for updating TR 38.905 with FR1 In-band Emissions test point analysis pCR

revised to R5-185319

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-184957 Discussion on test point selection for In-band Emissions test case in FR1 discussion

revised to R5-185318

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184958 TP for updating TR 38.905 with FR2 SEM test point analysis pCR

revised to R5-185215

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-184959 Update to Test frequencies for SEM in TS 38.521-2 pCR

revised to R5-185194

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184960 Addition of Frequency Error test case to TS 38.521-2 pCR

revised to R5-185350

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184961 TP for updating TR 38.905 with FR2 Frequency Error test point analysis pCR ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-184962 Discussion on test point selection for Frequency Error in FR2 discussion

revised to R5-185349

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-184963 Addition of EVM test case to TS 38.521-2 pCR

revised to R5-185195

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184964 TP for updating TR 38.905 with FR2 EVM test point analysis pCR ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

withdrawn [WTS] [JSN]
R5-184965 Discussion on test point selection for EVM in FR2 discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184966 Addition of Carrier Leakage test case to TS 38.521-2 pCR

revised to R5-185196

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184967 TP for updating TR 38.905 with FR2 Carrier Leakage test point analysis pCR ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

withdrawn [WTS] [JSN]
R5-184968 Discussion on test point selection for Carrier Leakage in FR2 discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184969 Addition of In-band Emissions test case to TS 38.521-2 pCR ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

withdrawn [WTS] [JSN]
R5-184970 TP for updating TR 38.905 with FR2 In-band Emissions test point analysis pCR ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

withdrawn [WTS] [JSN]
R5-184971 Discussion on test point selection for In-band Emissions in FR2 discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184972 Addition of EVM equalizer spectral flatness test case to TS 38.521-2 pCR ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

withdrawn [WTS] [JSN]
R5-184973 TP for updating TR 38.905 with FR2 EVM equalizer spectral flatness test point analysis pCR ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

withdrawn [WTS] [JSN]
R5-184974 Discussion on test point selection for EVM equalizer spectral flatness in FR2 discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184975 Discussion on Measurement Uncertainty in FR2 discussion ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184976 TP on Measurement Uncertainty Contributions in FR2 pCR

revised to R5-185214

ROHDE & SCHWARZ 38.903 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

revised [WTS] [JSN]
R5-184977 L2 Preamble Parameter Update for Multi-PDN configuration CR

revised to R5-185099

Qualcomm Korea 38.523-1 15.0.0 CR#68 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184978 Discussion on TT for EN-DC test cases discussion Huawei,HiSilicon 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184979 Discussion on Test configuraion table for EN-DC test cases discussion Huawei,HiSilicon 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

withdrawn [WTS] [JSN]
R5-184980 Cat1bis test cases applicability CR Qualcomm Austria RFFE GmbH 36.521-2 15.2.0 CR#766 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.3

agreed [WTS] [JSN]
R5-184981 Correction to NR RLC test cases 7.1.2.2.3 and 7.1.2.2.4 CR

revised to R5-185100

Keysight Technologies UK Ltd, MCC TF160 38.523-1 15.0.0 CR#69 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184982 Resubmission of Cat1bis applicability CR CR ETSI MCC (Qualcomm Korea, Bureau Veritas, Rohde & Schwarz, CATR) 36.521-2 15.2.0 CR#767 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.3

agreed [WTS] [JSN]
R5-184983 Introduction of maximum output power test cases pCR

revised to R5-185197

Ericsson 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-184984 Correction to NR RRC test case 8.2.3.14.1 CR

revised to R5-185101

Keysight Technologies UK Ltd 38.523-1 15.0.0 CR#70 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-184985 Correction to V2X TC 24.1.16 & 24.1.19 CR

revised to R5-185112

ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.2.0 CR#4646 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

revised [WTS] [JSN]
R5-184986 Correction to V2V TC 24.1.2 CR

revised to R5-185141

ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.2.0 CR#4647 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 6.3.5.3

revised [WTS] [JSN]
R5-184987 Addition of reference dedicated EPS bearer context #7 for V2X testing CR

revised to R5-185104

CATT 36.508 15.2.0 CR#1201 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.1

revised [WTS] [JSN]
R5-184988 Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 CR

revised to R5-185175

CGC Inc. 36.521-1 15.2.0 CR#4492 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

revised [WTS] [JSN]
R5-184989 Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. CR

revised to R5-185176

CGC Inc. 36.521-1 15.2.0 CR#4493 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

revised [WTS] [JSN]
R5-184990 New Test Case for 36.579-6 - 6.1.1.8 pCR NIST 36.579-6 0.0.2 MCImp-UEConTest Rel-16 R5-80

AI: 6.3.23.6

approved [WTS] [JSN]
R5-184991 Correction to Reference sensitivity level for CA UL Allocation in Table 7.3A.1.4.1-1 CR Intel Corporation (UK) Ltd 36.521-1 15.2.0 CR#4494 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.2.2

agreed [WTS] [JSN]
R5-184992 CPWG180802-1 LS on Over-the-Air Radiated Performance Testing for 5G mm-Wave (FR2) User Equipment LS in

source LS: CPWG180802-1

CTIA 5G Millimeter-Wave OTA Sub-Working Group R5-80

AI: 3

noted [WTS] [JSN]
R5-184993 Addition of test points for UL-CA_2A-12A in TC 6.3.2A.2 CR Dekra 36.521-1 15.2.0 CR#4495 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-184994 Addition of test points for UL-CA_2A-12A in TC 6.3.5A.2.2 CR Dekra 36.521-1 15.2.0 CR#4496 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

withdrawn [WTS] [JSN]
R5-184995 WP UE Conformance Test Aspects - Requirements for a new UE category 1bis with single receiver based on category 1 for LTE Work Plan Qualcomm Inc. LTE_UE_cat_1RX-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184996 SR UE Conformance Test Aspects - Requirements for a new UE category 1bis with single receiver based on category 1 for LTE WI status report Qualcomm Inc. LTE_UE_cat_1RX-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-184997 LS from 5GAA for rel-15 2 RX vehicle mounted UE LS in 5GAA WG2 R5-80

AI: 3

noted [WTS] [JSN]
R5-184998 RAN5#79 WG Action Points report

revision of R5-184006

ETSI Secretariat R5-80

AI: 2.1

noted [WTS] [JSN]
R5-184999 MCC TF160 Status Report report

revision of R5-184070

MCC TF160 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-185000 New WID for Rel-16 LTE CA WID new

revision of R5-184432

Ericsson Rel-16 R5-80

AI: 7.4.1

agreed [WTS] [JSN]
R5-185001 Discussion paper on principles for defining NR test frequencies and selecting associated parameters for SS to signal discussion

revision of R5-184449

Ericsson, Sprint, MCC TF160 5GS_NR_LTE-UEConTest R5-80

AI: 4.5.3

noted [WTS] [JSN]
R5-185002 Correction to ATTACH ACCEPT message for SMS only CR

revision of R5-184094

ROHDE & SCHWARZ 36.508 15.2.0 CR#11791 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.1

agreed [WTS] [JSN]
R5-185003 Correction of 6.2.3.2 Test Frequency for CA_3A-27A CR

revision of R5-184404

KT Corp. 36.508 15.2.0 CR#11901 catF TEI12_Test Rel-15 R5-80

AI: 6.4.1

agreed [WTS] [JSN]
R5-185004 Correction to Idle mode Inter-RAT G<>E test case 6.2.3.21 to allow optional IMS registration on EUTRAN cell CR

revision of R5-184331

Keysight Technologies UK Ltd, Samsung 36.523-1 15.2.0 CR#45981 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.1

agreed [WTS] [JSN]
R5-185005 Update of number of DL PDCP SDUs in test cases 7.1.7.1.x CR

revision of R5-184503

revised to R5-185169

MediaTek Inc. 36.523-1 15.2.0 CR#46021 catF TEI14_Test Rel-15 R5-80

AI: 6.4.3.2.1

revised [WTS] [JSN]
R5-185006 Update of DL 256QAM TCs for high UE DL Categories CR

revision of R5-184504

MediaTek Inc. 36.523-1 15.2.0 CR#46031 catF TEI12_Test, LTE_SC_enh_L1-UEConTest Rel-15 R5-80

AI: 6.4.3.2.1

agreed [WTS] [JSN]
R5-185007 Correction to RRC TC 8.5.4.1 CR

revision of R5-184505

MediaTek Inc. 36.523-1 15.2.0 CR#46041 catF TEI14_Test Rel-15 R5-80

AI: 6.4.3.3.1

agreed [WTS] [JSN]
R5-185008 Correction to EMM test case 9.2.3.1.25 CR

revision of R5-184053

ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.2.0 CR#45821 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.4

agreed [WTS] [JSN]
R5-185009 Correction to testcase 9.2.2.1.9 for CAT-M1 UEs CR

revision of R5-184532

ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.2.0 CR#46101 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 6.4.3.4

agreed [WTS] [JSN]
R5-185010 Update of EMM test case 9.2.3.2.17 CR

revision of R5-184709

Qualcomm Incorporated 36.523-1 15.2.0 CR#46201 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.4

agreed [WTS] [JSN]
R5-185011 Correction of clause 4.3.3.2.3 CR

revised to R5-185133

Ericsson 38.508-1 15.0.0 CR#86 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 4.5.2

revised [WTS] [JSN]
R5-185012 Clarification for NB-IoT test case 22.3.1.1 CR

revision of R5-184079

MCC TF160, Rohde&Schwarz 36.523-1 15.2.0 CR#45841 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-185013 Correction to NB-IoT test case 22.5.8 CR

revision of R5-184089

ROHDE & SCHWARZ 36.523-1 15.2.0 CR#45851 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-185014 Correction to NB-IoT test case 22.5.14 CR

revision of R5-184090

ROHDE & SCHWARZ, Qualcomm 36.523-1 15.2.0 CR#45861 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-185015 Corrections to NBIOT NAS TC 22.5.7b CR

revision of R5-184216

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#46401 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-185016 Correction to NB-IoT test cases 22.4.8 and 22.4.9 CR

revision of R5-184322

ANRITSU LTD 36.523-1 15.2.0 CR#45961 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

withdrawn [WTS] [JSN]
R5-185017 Correction to NB-IoT test cases 22.4.4, 22.4.8 and 22.4.9 CR ANRITSU LTD, Qualcomm 36.523-1 15.2.0 CR#4648 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-185018 Correction to NB-IoT test case 22.2.9 CR

revision of R5-184518

ANRITSU LTD 36.523-1 15.2.0 CR#46091 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-185019 Update to NB-IOT test case 22.1.1 M2 CR

revision of R5-184711

Qualcomm Incorporated, Anritsu, Rohde & Schwarz 36.523-1 15.2.0 CR#46221 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-185020 Update to NB-IOT test case 22.3.1.2 CR

revision of R5-184712

Qualcomm Incorporated 36.523-1 15.2.0 CR#46231 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-185021 Correction to NB-IoT testcase 22.3.3.5 CR

revision of R5-184807

ROHDE & SCHWARZ 36.523-1 15.2.0 CR#46411 catF TEI13_Test, NB_IOT-UEConTest Rel-15 R5-80

AI: 6.4.3.11

agreed [WTS] [JSN]
R5-185022 Correction to NB-IoT test case 22.4.20a execution guideline CR Anritsu Ltd, Qualcomm 36.523-2 15.2.0 CR#1212 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.4

agreed [WTS] [JSN]
R5-185023 Updates of 6.2.3.2 Test Frequency for CA_8A-27A CR

revision of R5-184393

KT Corp. 36.508 15.2.0 CR#11891 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 6.3.17.1

agreed [WTS] [JSN]
R5-185024 Addition of new R15 CA configurations to 36.523-2 CR

revision of R5-184588

Bureau Veritas, Ericsson 36.523-2 15.2.0 CR#11981 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 6.3.17.3

agreed [WTS] [JSN]
R5-185025 Multi-PDN Handling in EN-DC discussion

revision of R5-184350

Qualcomm Korea 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.19

noted [WTS] [JSN]
R5-185026 ASN.1 Version Handling for NSA and SA discussion

revision of R5-184351

Qualcomm Korea 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.19

noted [WTS] [JSN]
R5-185027 Default channel bandwidth of new NR bands for non-CA signaling test cases discussion

revision of R5-184664

NTT DOCOMO, INC., CMCC, KDDI Corporation, KT Corp., Orange, Telecom Italia S.p.A. R5-80

AI: 6.3.13.19

noted [WTS] [JSN]
R5-185028 Add SRB1 and SRB2 with NR PDCP CR

revision of R5-184055

Ericsson 38.508-1 15.0.0 CR#21 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185029 Update serving cell CR

revision of R5-184084

Ericsson, DOCOMO Communications Lab 38.508-1 15.0.0 CR#31 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185030 Introduce SA RRC messages CR

revision of R5-184097

Ericsson 38.508-1 15.0.0 CR#51 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185031 Correct IE FrequencyInfoDL CR

revision of R5-184126

Ericsson, DOCOMO Communications Lab 38.508-1 15.0.0 CR#61 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185032 Introduce SA system information blocks CR

revision of R5-184127

Ericsson 38.508-1 15.0.0 CR#71 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185033 Introduce SA other information elements CR

revision of R5-184134

Ericsson 38.508-1 15.0.0 CR#81 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185034 Updates to PDCCH and SearchSpace configurations CR

revision of R5-184176

revised to R5-185171

MCC TF160, NTT DOCOMO, INC. 38.508-1 15.0.0 CR#91 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

revised [WTS] [JSN]
R5-185035 Correct IE GSCN-ValueNR CR

revision of R5-184318

Ericsson, DOCOMO Communications Lab 38.508-1 15.0.0 CR#131 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185036 Update of FR1 signal levels CR

revision of R5-184339

ANRITSU LTD 38.508-1 15.0.0 CR#171 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.2.2

agreed [WTS] [JSN]
R5-185037 Addition of IP Connectivity check procedure CR

revision of R5-184358

Qualcomm Tech. Netherlands B.V, MCC TF160 38.508-1 15.0.0 CR#221 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185038 Introduce SA radio resource control information elements CR

revision of R5-184560

Ericsson 38.508-1 15.0.0 CR#531 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185039 Update IE PhysicalCellGroupConfig CR

revision of R5-184597

Ericsson, DOCOMO Communications Lab 38.508-1 15.0.0 CR#541 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185040 Introduce cell configurations and timer tolerances chapter headers CR

revision of R5-184598

Ericsson 38.508-1 15.0.0 CR#551 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185041 Add IE SSB-MTC CR

revision of R5-184600

Ericsson, DOCOMO Communications Lab 38.508-1 15.0.0 CR#571 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185042 Update BWP CR

revision of R5-184616

DOCOMO Communications Lab, Ericsson 38.508-1 15.0.0 CR#581 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185043 Update PDSCH-Config CR

revision of R5-184618

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#601 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185044 Update PUCCH and PUSCH configuration CR

revision of R5-184620

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#621 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185045 Update RACH configuration CR

revision of R5-184621

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#631 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185046 Update CellGroupConfig CR

revision of R5-184623

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#651 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185047 Update CSI-MeasConfig CR

revision of R5-184624

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#661 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185048 Update MeasConfig CR

revision of R5-184625

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#671 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185049 Update other information elements CR

revision of R5-184626

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#681 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185050 Update RadioBearerConfig CR

revision of R5-184628

DOCOMO Communications Lab. 38.508-1 15.0.0 CR#701 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185051 Specifying content for MeasResultSCG-Failure CR

revision of R5-184675

Samsung 38.508-1 15.0.0 CR#731 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185052 Editorial correction to band representation of non-contiguous EN-DC band combination CR

revision of R5-184706

Keysight Technologies UK Ltd 38.508-1 15.0.0 CR#751 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185053 Correction to RLC-Config IE CR

revision of R5-184713

Ericsson 38.508-1 15.0.0 CR#761 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185054 Correction to RadioBearerConfig-DRB CR

revision of R5-184714

Ericsson 38.508-1 15.0.0 CR#771 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185055 Corrections ard updates to BandCombinationList and Feature Set IEs CR

revision of R5-184715

Ericsson 38.508-1 15.0.0 CR#781 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185056 Corrections and updates to UE Capability IEs CR

revision of R5-184902

Ericsson 38.508-1 15.0.0 CR#841 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185057 Editorial updates to 38.509 CR

revision of R5-184673

Samsung, MCC TF160 38.509 15.0.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.3

agreed [WTS] [JSN]
R5-185058 Addition of Test Loop for SDAP testing CR

revision of R5-184700

Motorola Mobility 38.509 15.0.0 CR#21 catB 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.3

withdrawn [WTS] [JSN]
R5-185059 Correction to NR MAC test case 7.1.1.3.2 CR

revision of R5-184175

Keysight Technologies UK Ltd 38.523-1 15.0.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185060 Addition of Correct Handling of DL HARQ process PDSCH Aggregation test case 7.1.1.2.2 CR

revision of R5-184220

Huawei, Hisilicon 38.523-1 15.0.0 CR#41 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185061 Addition of NR CA reconfiguration test case 8.2.4.2.1.1 CR

revision of R5-184221

Huawei, Hisilicon 38.523-1 15.0.0 CR#51 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185062 Addition of NR CA reconfiguration test case 8.2.4.2.1.2 CR

revision of R5-184222

Huawei, Hisilicon 38.523-1 15.0.0 CR#61 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185063 Addition of Random access test case 7.1.1.1.4 CR

revision of R5-184225

Huawei, Hisilicon 38.523-1 15.0.0 CR#91 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-185064 Addition of 5GS NR SDAP test case 7.1.4.1 CR

revision of R5-184324

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#151 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185065 Correction to 5GS MAC Test case 7.1.1.1.2 Random access procedure / Successful / C-RNTI Based / Preamble selected by MAC itself CR

revision of R5-184338

Qualcomm Korea 38.523-1 15.0.0 CR#161 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185066 Correction to 5GS MAC Test case 7.1.1.5.3 DRX operation / Short cycle configured / Parameters configured by RRC CR

revision of R5-184340

Qualcomm Korea 38.523-1 15.0.0 CR#171 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185067 Correction to 5GS RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation CR

revision of R5-184341

Qualcomm Korea 38.523-1 15.0.0 CR#181 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185068 Correction to 5GS RLC Test case 7.1.2.3.11 AM RLC / RLC re-establishment procedure CR

revision of R5-184342

Qualcomm Korea 38.523-1 15.0.0 CR#191 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185069 Addition of NR CA / NR SCell addition / modification / release / Success test cases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 CR

revision of R5-184345

Qualcomm Korea 38.523-1 15.0.0 CR#221 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185070 Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC CR

revision of R5-184357

Qualcomm Tech. Netherlands B.V 38.523-1 15.0.0 CR#271 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185071 Correction to 5GS RRC TC 8.2.4.3.1.1 CR

revision of R5-184498

TDIA, CATT 38.523-1 15.0.0 CR#291 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185072 Addition of 5GS RRC TC 8.2.4.3.1.2 CR

revision of R5-184499

TDIA, CATT 38.523-1 15.0.0 CR#301 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185073 Corrections to Layer 2 test cases CR

revision of R5-184520

Motorola Mobility, Huawei 38.523-1 15.0.0 CR#331 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185074 Corrections to MAC test case 7.1.2.2.1 CR

revision of R5-184521

Motorola Mobility, MCC TF160 38.523-1 15.0.0 CR#341 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185075 Corrections to MAC test case 7.1.2.3.1 CR

revision of R5-184522

Motorola Mobility, MCC TF160 38.523-1 15.0.0 CR#351 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185076 Addition of new MAC RACH test case for PDCCH order CR

revision of R5-184524

Motorola Mobility 38.523-1 15.0.0 CR#371 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185077 Addition of new MAC test case for Scell Activation Deactivation CR

revision of R5-184526

Motorola Mobility 38.523-1 15.0.0 CR#391 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185078 Addition of new MAC UL TBS test case with transform precoding configured CR

revision of R5-184528

Motorola Mobility 38.523-1 15.0.0 CR#411 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185079 Correction to default pre-test conditions for UM RLC test cases CR

revision of R5-184552

Keysight Technologies UK Ltd 38.523-1 15.0.0 CR#421 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185080 New NAS test case 9.1.5.1.12 CR

revision of R5-184591

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#431 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185081 New NAS test case 9.1.6.1.4 CR

revision of R5-184593

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#441 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

withdrawn [WTS] [JSN]
R5-185082 Correction to NR PDCP test case 7.1.3.5.1 CR

revision of R5-184603

ANRITSU LTD 38.523-1 15.0.0 CR#451 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185083 Correction to NR RLC test case 7.1.2.3.3 and 7.1.2.3.4 CR

revision of R5-184612

ANRITSU LTD 38.523-1 15.0.0 CR#461 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185084 Update to TLS setup CR MCC TF160, Motorola Solutions UK Ltd. 36.579-1 13.1.0 CR#9 catF TEI13_Test, MCPTT-ConTest Rel-13 R5-80

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-185085 Addition of UM condition to RLC-Bearer-Config IE CR Ericsson 38.508-1 15.0.0 CR#87 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185086 Update to EPS SM Test case for Multi-PDN CR

revised to R5-185167

Qualcomm Inc. 38.523-1 15.0.0 CR#71 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

revised [WTS] [JSN]
R5-185087 Update to Emergency Call test case 19.1.3 for eCall category bit usage CR

revision of R5-184705

Qualcomm Incorporated 34.229-1 14.3.0 CR#12931 catF TEI9_Test Rel-14 R5-80

AI: 6.5.6.1

agreed [WTS] [JSN]
R5-185088 Adding SMS over IP configuration to applicabilities CR

revision of R5-184059

ROHDE & SCHWARZ 34.229-2 14.3.0 CR#2471 catF TEI8_Test Rel-14 R5-80

AI: 6.5.6.2

agreed [WTS] [JSN]
R5-185089 Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of NR cells / EN-DC CR

revision of R5-184661

Intertek 38.523-1 15.0.0 CR#491 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185090 CR of AM RLC test case 7.1.2.3.10 CR

revision of R5-184670

Huawei, Hisilicon 38.523-1 15.0.0 CR#501 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185091 Update of RRC SCG failure TC 8.2.5.1.1 CR

revision of R5-184676

Samsung, Qualcomm 38.523-1 15.0.0 CR#511 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185092 Update of RRC SCG failure TC 8.2.5.2.1 CR

revision of R5-184677

Samsung, Qualcomm 38.523-1 15.0.0 CR#521 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185093 Update of RRC SCG failure TC 8.2.5.3.1 CR

revision of R5-184678

Samsung, Qualcomm 38.523-1 15.0.0 CR#531 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185094 Update of RRC SCG failure TC 8.2.5.4.1 CR

revision of R5-184679

Samsung, Qualcomm 38.523-1 15.0.0 CR#541 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185095 Addition of 5GS NR SDAP test case 7.1.4.2 CR

revision of R5-184702

Motorola Mobility 38.523-1 15.0.0 CR#571 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185096 Update of 5GS NR RRC test case 8.2.3.6.1 CR

revision of R5-184770

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#641 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185097 Update of 5GS NR RRC test case 8.2.3.8.1 CR

revision of R5-184774

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#661 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185098 Update of 5GS NR RRC test case 8.2.1.1.1 CR

revision of R5-184777

ROHDE & SCHWARZ 38.523-1 15.0.0 CR#671 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185099 L2 Preamble Parameter Update for Multi-PDN configuration CR

revision of R5-184977

Qualcomm Korea 38.523-1 15.0.0 CR#681 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185100 Correction to NR RLC test cases 7.1.2.2.3 and 7.1.2.2.4 CR

revision of R5-184981

Keysight Technologies UK Ltd, MCC TF160 38.523-1 15.0.0 CR#691 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185101 Correction to NR RRC test case 8.2.3.14.1 CR

revision of R5-184984

Keysight Technologies UK Ltd 38.523-1 15.0.0 CR#701 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185102 Addition of applicability and tests conditions for 5GC test cases 8.2.4.3.1.2, 8.2.4.3.1.3, 9.1.2.1 and 9.1.2.2 CR

revision of R5-184496

CATT, TDIA 38.523-2 15.0.0 CR#21 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.5

withdrawn [WTS] [JSN]
R5-185103 Specifying content for SCGFailureInformationNR CR

revision of R5-184674

Samsung 36.508 15.2.0 CR#11961 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.

agreed [WTS] [JSN]
R5-185104 Addition of reference dedicated EPS bearer context #7 for V2X testing CR

revision of R5-184987

CATT 36.508 15.2.0 CR#12011 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.1

agreed [WTS] [JSN]
R5-185105 Addition of Test Case:” LWA / T351 Expiry” to WLAN/3GPP Radio Level Integration and Interworking Enhancement Interworking Work Item CR

revision of R5-184145

Intel Corporation (UK) Ltd 36.523-1 15.2.0 CR#45911 catF LTE_WLAN_radio-UEConTest Rel-15 R5-80

AI: 6.3.3.2

agreed [WTS] [JSN]
R5-185106 Correction of Test Cases 8.2.5.4 and 8.2.5.5 CR

revision of R5-184192

Intel Corporation (UK) Ltd 36.523-1 15.2.0 CR#45921 catF LTE_WLAN_radio-UEConTest Rel-15 R5-80

AI: 6.3.3.2

agreed [WTS] [JSN]
R5-185107 Addition of new V2X test case 24.2.4 CR

revision of R5-184632

revised to R5-185160

CAICT 36.523-1 15.2.0 CR#46151 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

revised [WTS] [JSN]
R5-185108 Correction to V2X test case 24.1.12 CR

revision of R5-184636

CAICT 36.523-1 15.2.0 CR#46161 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-185109 Correction to V2X test case 24.1.1, 24.1.3, 24.1.5, 24.1.6, 24.1.10 and 24.1.11 CR

revision of R5-184652

CAICT 36.523-1 15.2.0 CR#46171 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-185110 New test case for V2X Sidelink using Tx parameters based on measured CBR and PPPP CR

revision of R5-184813

Sporton, TTA 36.523-1 15.2.0 CR#46421 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

withdrawn [WTS] [JSN]
R5-185111 New test case for V2X Sidelink with SL SPS Transmission CR Sporton, TTA 36.523-1 15.2.0 CR#4649 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-185112 Correction to V2X TC 24.1.16 & 24.1.19 CR

revision of R5-184985

ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.2.0 CR#46461 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-185113 Addition of NB_IOTenh-UEConTest test case scenarios and default SIB content CR

revision of R5-184791

CATT, TDIA, Starpoint, Sporton 36.508 15.2.0 CR#11981 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.1

agreed [WTS] [JSN]
R5-185114 Correction to eNB-IoT test case 22.3.2.7 CR

revision of R5-184095

MCC TF160, TDIA 36.523-1 15.2.0 CR#45901 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-185115 Addition to NB-IoT testcase 22.3.1.6a CR

revision of R5-184501

TDIA, CATT, Starpoint 36.523-1 15.2.0 CR#46011 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-185116 Addition of new NB_IOTenh-UEConTest test case 22.3.1.8 CR

revision of R5-184784

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#46291 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-185117 Addition of new NB_IOTenh-UEConTest test case 22.3.1.10 CR

revision of R5-184787

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#46311 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-185118 Addition of new NB_IOTenh-UEConTest test case 22.4.24 CR

revision of R5-184788

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#46321 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-185119 Addition of new NB_IOTenh-UEConTest test case 22.4.25 CR

revision of R5-184789

CATT, TDIA, Starpoint 36.523-1 15.2.0 CR#46331 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-185120 New test case for NB-IoT UM RLC CR

revision of R5-184815

Sporton, TTA, TDIA 36.523-1 15.2.0 CR#46431 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.3

agreed [WTS] [JSN]
R5-185121 Addition of applicability and tests conditions for new Enhancements NB-IoT TC 22.3.2.6 CR Sporton 36.523-2 15.2.0 CR#1213 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 6.3.15.4

agreed [WTS] [JSN]
R5-185122 Corrections to MCPTT Authorization CR

revision of R5-184663

MCC TF160 36.579-1 13.1.0 CR#71 catF TEI13_Test, MCPTT-ConTest Rel-13 R5-80

AI: 6.5.9.1

agreed [WTS] [JSN]
R5-185123 Adding a new Rel-14 TC on Private Call Call-Back Request / Client Originated (CO) / Private call call-back fulfilment CR

revision of R5-184686

Samsung 36.579-2 13.1.0 CR#101 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.2

agreed [WTS] [JSN]
R5-185124 Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Originated (CO) CR

revision of R5-184688

Samsung 36.579-2 13.1.0 CR#121 catF MCImp-UEConTest Rel-14 R5-80

AI: 6.3.23.2

agreed [WTS] [JSN]
R5-185125 Corrections to UE Test Loop Mode H CR

revision of R5-184076

MCC TF160 36.509 13.6.0 CR#1931 catF TEI13_Test, NB_IOT-UEConTest Rel-13 R5-80

AI: 6.4.2

agreed [WTS] [JSN]
R5-185126 Correction to SSAC connected mode test cases 13.5.1a and 13.5.3a for IMS Enabled UE CR

revision of R5-184323

Keysight Technologies UK Ltd 36.523-1 15.2.0 CR#45971 catF TEI12_Test Rel-15 R5-80

AI: 6.4.3.8

agreed [WTS] [JSN]
R5-185127 New Work Item Proposal: UE Conformance Test Aspects - Addition of Power Class 1 UE to bands B31/B72 for LTE WID new

revision of R5-184334

Airbus DS SLC Rel-15 R5-80

AI: 7.4.1

agreed [WTS] [JSN]
R5-185128 New WID on UE Conformance Test Aspects - ProSe Support for Band 72 in LTE WID new

revision of R5-184337

Airbus DS SLC Rel-15 R5-80

AI: 7.4.1

agreed [WTS] [JSN]
R5-185129 Update of UE test loop mode E CR

revision of R5-184739

Huawei,HiSilicon, CATT 36.509 15.0.0 CR#1961 catA LTE_V2X-UEConTest Rel-15 R5-80

AI: 4.5.1

agreed [WTS] [JSN]
R5-185130 Update of UE test loop mode E CR Huawei,HiSilicon, CATT 36.509 14.4.0 CR#197 catF LTE_V2X-UEConTest Rel-14 R5-80

AI: 4.5.1

agreed [WTS] [JSN]
R5-185131 Reuse of demodulation setup for signalling tests in FR2 discussion

revision of R5-184188

ANRITSU LTD 5GS_NR_LTE-UEConTest R5-80

AI: 4.5.2

noted [WTS] [JSN]
R5-185132 OTA Chamber requirements for 5G NR Signalling test cases discussion

revision of R5-184568

Keysight Technologies UK Ltd R5-80

AI: 6.3.13.19

noted [WTS] [JSN]
R5-185133 Correction of clause 4.3.3.2.3 CR

revision of R5-185011

Ericsson 38.508-1 15.0.0 CR#861 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 4.5.2

agreed [WTS] [JSN]
R5-185134 Draft TR 38.905 v1.0.0 draft TR Ericsson LM 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-185135 Correction to 10.7.4 regarding CE mode CR

revision of R5-184067

ROHDE & SCHWARZ 36.523-1 15.2.0 CR#45831 catF TEI8_Test Rel-15 R5-80

AI: 6.4.3.5

agreed [WTS] [JSN]
R5-185136 Update EPS Session Management test case in section 10 of TS 36.523-1. CR

revision of R5-184044

FirstNet, AT&T 36.523-1 15.2.0 CR#45811 catF TEI14_Test Rel-15 R5-80

AI: 6.4.3.5

withdrawn [WTS] [JSN]
R5-185137 Update to applicability condition of Intra-frequency measurement reporting test cases for CAT-M1 UEs CR

revision of R5-184732

Qualcomm Incorporated 36.523-2 15.2.0 CR#12041 catF TEI8_Test Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-185138 Removal of 1xPre-Registation and 1xCSFB test cases applicability CR

revision of R5-184735

Qualcomm Incorporated 36.523-2 15.2.0 CR#12061 catF TEI8_Test Rel-15 R5-80

AI: 6.4.4

agreed [WTS] [JSN]
R5-185139 Routine maintenance for TS 36.523-3 CR

revision of R5-184080

revised to R5-185180

MCC TF160 36.523-3 15.0.0 CR#42541 catF TEI8_Test Rel-15 R5-80

AI: 6.4.5

revised [WTS] [JSN]
R5-185140 New CA band combination CA_1A-3A-7A-20A - Update of table A.4.3.3.3-5 CR

revision of R5-184119

Vodafone GmbH 36.523-2 15.2.0 CR#11871 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 6.3.4.3

agreed [WTS] [JSN]
R5-185141 Correction to V2V TC 24.1.2 CR

revision of R5-184986

ROHDE & SCHWARZ, Qualcomm Incorporated 36.523-1 15.2.0 CR#46471 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 6.3.5.3

agreed [WTS] [JSN]
R5-185142 Draft TS 36.579-6 v0.0.3 draft TS Samsung MCImp-UEConTest Rel-14 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-185143 Draft TS 36.579-7 v0.0.3 draft TS Samsung MCImp-UEConTest Rel-14 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-185144 Draft TS 38.521-2 v1.0.0 draft TS CAICT 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-185145 Draft TS 38.521-3 v1.0.0 draft TS Qualcomm Europe Inc.(France) 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-185146 Draft TR 38.903 v1.0.0 draft TR Huawei 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.5

approved [WTS] [JSN]
R5-185147 LS Concerning RAN5 Response to ITU-R Working Party 5D LS on definition of test methods for OTA unwanted emissions of IMT radio equipment LS out

LS is reply to R5-184024

LS To: TSG RAN

TSG WG RAN5 R5-80

AI: 7.5

postponed [WTS] [JSN]
R5-185148 Addition of NR CA reconfiguration test case 8.2.4.2.1.3 CR

revision of R5-184223

Huawei, Hisilicon 38.523-1 15.0.0 CR#71 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185149 Corrections to RRC TC - PSCell addition, modification and release / SCG DRB / EN-DC CR

revision of R5-184354

Qualcomm Tech. Netherlands B.V 38.523-1 15.0.0 CR#241 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185150 Corrections to RRC TC - Bearer Modification / Handling for bearer type change with security key change / EN-DC CR

revision of R5-184355

Qualcomm Tech. Netherlands B.V 38.523-1 15.0.0 CR#251 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185151 Corrections to RRC TC - Bearer Modification / Uplink data path / Split DRB Reconfiguration / EN-DC CR

revision of R5-184356

Qualcomm Tech. Netherlands B.V 38.523-1 15.0.0 CR#261 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185152 Addition of new MAC test case for Power Headroom report CR

revision of R5-184525

Motorola Mobility 38.523-1 15.0.0 CR#381 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185153 Addition of RRC Default Pre-test conditions for NSA CR

revision of R5-184613

Qualcomm Korea 38.523-1 15.0.0 CR#471 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185154 Correction to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC CR

revision of R5-184756

Qualcomm Incorporated 38.523-1 15.0.0 CR#581 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185155 Updates to NAS test case 10.2.1.2 CR

revision of R5-184767

Ericsson LM 38.523-1 15.0.0 CR#621 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185156 EN-DC: Test Model updates CR

revision of R5-184073

revised to R5-185172

MCC TF160 38.523-3 15.0.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.6

revised [WTS] [JSN]
R5-185157 Update of NR test cases title and applicability CR

revision of R5-184753

Qualcomm Incorporated 38.523-2 15.0.0 CR#51 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.5

agreed [WTS] [JSN]
R5-185158 Update Reference Table 6.6.2-1A dedicated EPS bearer contexts CR

revision of R5-184045

FirstNet, AT&T 36.508 15.2.0 CR#11761 catF TEI14_Test Rel-15 R5-80

AI: 6.4.1

agreed [WTS] [JSN]
R5-185159 Correction to CAT-M1 Test case 8.2.4.27 CR

revision of R5-184543

Anritsu Ltd., Nordic Semiconductor ASA 36.523-1 15.2.0 CR#46111 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 6.4.3.3.2

agreed [WTS] [JSN]
R5-185160 Addition of new V2X test case 24.2.4 CR

revision of R5-185107

CAICT 36.523-1 15.2.0 CR#46152 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 6.3.12.3

agreed [WTS] [JSN]
R5-185161 Addition of PICS CR

revision of R5-184699

Motorola Mobility 38.508-2 15.0.0 CR#11 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.2

agreed [WTS] [JSN]
R5-185162 Addition of missing and new test cases applicabilities CR

revision of R5-184531

Motorola Mobility 38.523-2 15.0.0 CR#31 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.5

agreed [WTS] [JSN]
R5-185163 Modified RRC_Connected procedure for Multi PDN throughout the test case. CR

revision of R5-184346

Qualcomm Korea, Ericsson 38.508-1 15.0.0 CR#181 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185164 Update RRCConnectionReconfiguration message for EN-DC CR

revision of R5-184042

Ericsson, Qualcomm Inc. 36.508 15.2.0 CR#11751 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.

agreed [WTS] [JSN]
R5-185165 Update EN-DC Generic Procedure Parameter for Multi-PDN addition throughout Test Case CR

revision of R5-184348

Qualcomm Korea 38.508-1 15.0.0 CR#201 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185166 Modification of EPS & Data Radio Bearer ID mapping for EN-DC Test cases CR

revision of R5-184349

Qualcomm Korea 36.508 15.2.0 CR#11881 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.

agreed [WTS] [JSN]
R5-185167 Update to EPS SM Test case for Multi-PDN CR

revision of R5-185086

Qualcomm Inc. 38.523-1 15.0.0 CR#711 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.4

agreed [WTS] [JSN]
R5-185168 Introduction of OTA signaling test environment CR

revision of R5-184851

Keysight Technologies UK Ltd, Anritsu Ltd 38.508-1 15.0.0 CR#821 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185169 Update of number of DL PDCP SDUs in test cases 7.1.7.1.x CR

revision of R5-185005

MediaTek Inc. 36.523-1 15.2.0 CR#46022 catF TEI14_Test Rel-15 R5-80

AI: 6.4.3.2.1

agreed [WTS] [JSN]
R5-185170 Meeting notes of offline discussion on FR2 UE common test setup discussion

revised to R5-185179

Anritsu R5-80

AI: 7.2.5

revised [WTS] [JSN]
R5-185171 Updates to PDCCH and SearchSpace configurations CR

revision of R5-185034

MCC TF160, NTT DOCOMO, INC. 38.508-1 15.0.0 CR#92 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.1

agreed [WTS] [JSN]
R5-185172 EN-DC: Test Model updates CR

revision of R5-185156

MCC TF160 38.523-3 15.0.0 CR#12 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 6.3.13.6

agreed [WTS] [JSN]
R5-185173 Test Frequencies CR

revision of R5-184332

Sprint Corporation, Ericsson 38.508-1 15.0.0 CR#161 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.2.1

agreed [WTS] [JSN]
R5-185174 Reference sensitivity requirements for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A CR

revision of R5-184775

WE Certification Oy, DISH Network 36.521-1 15.2.0 CR#44571 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-185175 Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 CR

revision of R5-184988

CGC Inc. 36.521-1 15.2.0 CR#44921 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185176 Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. CR

revision of R5-184989

CGC Inc. 36.521-1 15.2.0 CR#44931 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-185177 Introduction of test frequencies for signalling testing in clause 6 CR

revision of R5-184478

Ericsson, TF160 38.508-1 15.0.0 CR#511 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.2.2

agreed [WTS] [JSN]
R5-185178 Addition of Test frequency for EN-DC B1_n78 CR

revision of R5-184352

Qualcomm Korea 38.508-1 15.0.0 CR#211 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 7.2.2

withdrawn [WTS] [JSN]
R5-185179 Meeting notes of offline discussion on FR2 UE common test setup discussion

revision of R5-185170

Anritsu R5-80

AI: 7.2.5

noted [WTS] [JSN]
R5-185180 Routine maintenance for TS 36.523-3 CR

revision of R5-185139

MCC TF160 36.523-3 15.0.0 CR#42542 catF TEI8_Test Rel-15 R5-80

AI: 6.4.5

agreed [WTS] [JSN]
R5-185181 WP - UE Conformance Test Aspects - eHST Work Plan

revision of R5-184561

CMCC LTE_high_speed-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-185182 SR - eHST after RAN5#80 WI status report

revision of R5-184562

CMCC LTE_high_speed-UEConTest R5-80

AI: 7.4.2

noted [WTS] [JSN]
R5-185184 Addition of V2X new TC 12.2.2 CR

revision of R5-184274

Huawei,HiSilicon, Rohde & Schwarz 36.521-3 15.2.1 CR#22501 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-185185 Band 41 HPUE Maximum Output Power CR

revision of R5-185548

CMCC 36.521-1 15.2.0 CR#43802 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.2

agreed [WTS] [JSN]
R5-185186 4Rx support in some 4DL CA and 5DL CA Demodulation test cases CR

revision of R5-184891

Ericsson 36.521-1 15.2.0 CR#44841 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-185187 FR2_RefSens_TestConfig_38.521-2 pCR

revision of R5-184367

Qualcomm Europe Inc. (Spain) 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185188 DL and UL RMC updated for FR2 tests pCR

revision of R5-184576

Bureau Veritas 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185189 Downlink physical channel updated for FR2 tests pCR

revision of R5-184577

Bureau Veritas 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185190 OCNG Patterns updated for FR2 tests pCR

revision of R5-184578

Bureau Veritas 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185191 Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-2 pCR

revision of R5-184907

Keysight Technologies UK Ltd 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185192 Update to ACS and inband blocking test cases in TS 38.521-2 pCR

revision of R5-184912

Keysight Technologies UK Ltd 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185193 Addition of Annex Global In-Channel TX-Test to 38.521-2 pCR

revision of R5-185353

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185194 Update to Test frequencies for SEM in TS 38.521-2 pCR

revision of R5-184959

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185195 Addition of EVM test case to TS 38.521-2 pCR

revision of R5-184963

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185196 Addition of Carrier Leakage test case to TS 38.521-2 pCR

revision of R5-184966

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185197 Introduction of maximum output power test cases pCR

revision of R5-184983

Ericsson 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185198 Addition of 6.2B.4.1.4 Configured OP for Inter-Band EN-DC including FR2 pCR

revision of R5-184747

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185199 Addition of 6.2B.4.1.5 Configured OP for Inter-Band EN-DC including both FR1 and FR2 pCR

revision of R5-184748

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185200 TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC pCR

revision of R5-185471

Ericsson LM 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185201 Introduction of TC 7.4B.1 pCR

revision of R5-185475

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185202 Introduction of 7.4B.2 pCR

revision of R5-185476

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185203 Introduction of 7.4B.3 pCR

revision of R5-185477

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185204 5G NR_EN_DC with FR1_Text update for RX sensitivity pCR

revision of R5-185482

Qualcomm Incorporated 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185205 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission pCR

revision of R5-185487

Qualcomm Incorporated 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185206 Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC pCR

revision of R5-185510

SGS Wireless 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185207 Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC pCR

revision of R5-185511

SGS Wireless 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185208 Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 pCR

revision of R5-185512

SGS Wireless 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185209 TP for Clause 4.1.1 of TS 38.522 pCR

revision of R5-184121

CMCC 38.522 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.8

approved [WTS] [JSN]
R5-185210 TP for Clause 4.1.2 of TS 38.522 pCR

revision of R5-184122

CMCC 38.522 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.8

approved [WTS] [JSN]
R5-185211 TP for Clause 4.1.3 of TS 38.522 pCR

revision of R5-184123

CMCC 38.522 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.8

approved [WTS] [JSN]
R5-185212 pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave pCR

revision of R5-185352

MVG Industries 38.903 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

approved [WTS] [JSN]
R5-185213 pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 pCR

revision of R5-184819

MVG Industries 38.903 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

approved [WTS] [JSN]
R5-185214 TP on Measurement Uncertainty Contributions in FR2 pCR

revision of R5-184976

ROHDE & SCHWARZ 38.903 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

approved [WTS] [JSN]
R5-185215 TP for updating TR 38.905 with FR2 SEM test point analysis pCR

revision of R5-184958

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185216 TP for updating TR38.905 with UE AMPR for NS_04 Intra-band contigous EN-DC pCR

revision of R5-185430

Ericsson LM 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185250 Introduction of test frequencies for NR band n1 CR

revision of R5-184450

Ericsson 38.508-1 15.0.0 CR#231 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185251 Introduction of test frequencies for NR band n2 CR

revision of R5-184451

Ericsson 38.508-1 15.0.0 CR#241 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185252 Introduction of test frequencies for NR band n3 CR

revision of R5-184452

Ericsson 38.508-1 15.0.0 CR#251 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185253 Introduction of test frequencies for NR band n5 CR

revision of R5-184453

Ericsson 38.508-1 15.0.0 CR#261 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185254 Introduction of test frequencies for NR band n7 CR

revision of R5-184454

Ericsson 38.508-1 15.0.0 CR#271 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185255 Introduction of test frequencies for NR band n8 CR

revision of R5-184455

Ericsson 38.508-1 15.0.0 CR#281 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185256 Introduction of test frequencies for NR band n12 CR

revision of R5-184456

Ericsson 38.508-1 15.0.0 CR#291 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185257 Introduction of test frequencies for NR band n20 CR

revision of R5-184457

Ericsson 38.508-1 15.0.0 CR#301 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185258 Introduction of test frequencies for NR band n25 CR

revision of R5-184458

Ericsson 38.508-1 15.0.0 CR#311 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185259 Introduction of test frequencies for NR band n28 CR

revision of R5-184459

Ericsson 38.508-1 15.0.0 CR#321 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185260 Introduction of test frequencies for NR band n34 CR

revision of R5-184460

Ericsson 38.508-1 15.0.0 CR#331 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185261 Introduction of test frequencies for NR band n38 CR

revision of R5-184461

Ericsson 38.508-1 15.0.0 CR#341 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185262 Introduction of test frequencies for NR band n39 CR

revision of R5-184462

Ericsson 38.508-1 15.0.0 CR#351 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185263 Introduction of test frequencies for NR band n40 CR

revision of R5-184463

Ericsson 38.508-1 15.0.0 CR#361 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185264 Update of test frequencies for NR band n41 CR

revision of R5-184464

Ericsson, Sprint 38.508-1 15.0.0 CR#371 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185265 Introduction of test frequencies for NR band n51 CR

revision of R5-184465

Ericsson 38.508-1 15.0.0 CR#381 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185266 Introduction of test frequencies for NR band n66 CR

revision of R5-184466

Ericsson, Dish Network 38.508-1 15.0.0 CR#391 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185267 Introduction of test frequencies for NR band n70 CR

revision of R5-184467

Ericsson, Dish Network 38.508-1 15.0.0 CR#401 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185268 Update of test frequencies for NR band n71 CR

revision of R5-184468

Ericsson, Dish Network 38.508-1 15.0.0 CR#411 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185269 Introduction of test frequencies for NR band n75 CR

revision of R5-184469

Ericsson 38.508-1 15.0.0 CR#421 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185270 Introduction of test frequencies for NR band n76 CR

revision of R5-184470

Ericsson 38.508-1 15.0.0 CR#431 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185300 LS on RAN4-RAN5 5G-NR RF pending issues during RAN5#80 LS out

LS is reply to R4-1809345

LS To: TSG WG RAN4

LS reply in R4-1811529

TSG WG RAN5 5GS_NR_LTE-UEConTest R5-80

AI: 5.6

approved [WTS] [JSN]
R5-185301 Discussion on test point selection for NR Out-of-band in FR1 discussion

revision of R5-184489

CAICT 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185302 Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC pCR

revised to R5-185510

SGS Wireless 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185303 Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC pCR

revised to R5-185511

SGS Wireless 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185304 Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 pCR

revised to R5-185512

SGS Wireless 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185305 Update of FR1 test case 6.2.1 pCR

revision of R5-184299

Huawei,HiSilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185306 Discussion on starting point of 200ms in FR1 RF test procedures discussion

revision of R5-184741

Huawei,HiSilicon, Keysight 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185307 TP for updating TR38.905 with FR1 AMPR test point analyses with NS_35 pCR

revision of R5-184751

Ericsson LM 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185308 Discussion on the test applicability for the modulation of Pi/2-BPSK discussion

revision of R5-184834

Huawei, Hisilicon 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185309 Test Point analysis for FR1 Configured Output Power for SUL pCR

revision of R5-184837

Huawei,HiSilicon 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185310 Discussion on test point selection for Carrier Leakage in FR1 discussion

revision of R5-184944

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185311 TP for updating TR 38.905 with FR1 Carrier Leakage test point analysis pCR

revision of R5-184943

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185312 Update to carrier leakage test case in TS 38.521-1 pCR

revision of R5-184942

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185313 Discussion on test point selection for EVM equalizer spectrum flatness in FR1 discussion

revision of R5-184949

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185314 TP for updating TR 38.905 with FR1 EVM equalizer spectrum flatness test point analysis pCR

revision of R5-184948

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185315 Update to EVM equalizer spectrum flatness test case in TS 38.521-1 pCR

revision of R5-184947

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185316 TP for updating TR 38.905 with FR1 Frequency Error test point analysis pCR

revision of R5-184951

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185317 Update to Frequency Error test case in TS 38.521-1 pCR

revision of R5-184950

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185318 Discussion on test point selection for In-band Emissions test case in FR1 discussion

revision of R5-184957

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185319 TP for updating TR 38.905 with FR1 In-band Emissions test point analysis pCR

revision of R5-184956

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185320 Update to In-band Emissions test case in TS 38.521-1 pCR

revision of R5-184955

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185321 TP to TS38.521-1:Operating bands and channel arrangement pCR

revision of R5-184085

China Unicom 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185322 Addition of FR1 test case 6.2.4 pCR

revision of R5-184300

Huawei,HiSilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185323 Update of FR1 test case 6.3.1 pCR

revision of R5-184301

Huawei,HiSilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185324 Addition of Uplink Physical Channels in Annex pCR

revision of R5-184824

Huawei, Hisilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185325 5G_FR1_Text_update for_RF_sensitivity_for_SUL_operation pCR

revision of R5-184919

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185326 Update to EVM test case in TS 38.521-1 pCR

revision of R5-184945

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185327 Addition of Annex Global In-Channel TX-Test to 38.521-1 pCR

revision of R5-184953

ROHDE & SCHWARZ 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185328 Discussion on the way to write Clause 7.4 Maximum Input Level and Clause 7.5 Adjacent Channel Selectivity in TS 38.521-3 discussion

revision of R5-184124

CMCC, HUAWEI Rel-15 R5-80

AI: 5.3.13.17

approved [WTS] [JSN]
R5-185329 Add Clause 7.5 into TS 38.521-3 pCR

revision of R5-184125

CMCC 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

withdrawn [WTS] [JSN]
R5-185330 Addition of test points for UL-CA_4A-12A in TC 6.3.2A.2 CR DEKRA 36.521-1 15.2.0 CR#4497 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-185331 Addition of test points for UL-CA_4A-12A in TC 6.3.5A.2.2 CR DEKRA 36.521-1 15.2.0 CR#4498 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-185332 Addition of 6.2B.4.1.1 Configured OP for Intra-Band Contiguous EN-DC pCR

revision of R5-184744

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185333 Addition of 6.2B.4.1.2 Configured OP for Intra-Band Non-Contiguous EN-DC pCR

revision of R5-184745

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185334 Discussion of LTE Test point selection for EN-DC with FR1 Tx Spurious emission Test discussion Qualcomm Inc. 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

not concluded [WTS] [JSN]
R5-185335 Estimation of measurement uncertainty for FR2 TRx test cases discussion

revision of R5-184426

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185336 Removing brackets from MU values in FR2 discussion

revision of R5-184427

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185337 Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F CR

revision of R5-184211

Qualcomm UK Ltd 36.521-3 15.2.1 CR#22371 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-185338 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis CR

revision of R5-184926

Qualcomm UK Ltd 36.903 14.1.0 CR#4121 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185339 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used CR

revision of R5-184928

Qualcomm UK Ltd 36.903 14.1.0 CR#4131 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185340 Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis CR

revision of R5-184930

Qualcomm UK Ltd 36.903 14.1.0 CR#4141 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185341 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis CR

revision of R5-184932

Qualcomm UK Ltd 36.903 14.1.0 CR#4151 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185342 Editorial cleaning up of Rel-14 CA 5DL RSRP measurement TC 9.1.51 CR

revision of R5-184288

Huawei,HiSilicon 36.521-3 15.2.1 CR#22531 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.4

agreed [WTS] [JSN]
R5-185343 New CA band combination CA_1A-3A-7A-20A - Update of table 7.3A.5, 7.3A.9 and refsens CR

revision of R5-184117

Vodafone GmbH 36.521-1 15.2.0 CR#43401 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.2

agreed [WTS] [JSN]
R5-185344 New CA band combination CA_1A-3A-7A-20A - Update of table A.4.6.3-5 CR

revision of R5-184118

Vodafone GmbH 36.521-2 15.2.0 CR#7371 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.3

withdrawn [WTS] [JSN]
R5-185345 New CA band combination CA_1A-3A-7A-20A - Update of test point analysis CR

revision of R5-184120

Vodafone GmbH 36.905 15.1.0 CR#1411 catF LTE_CA_R14-UEConTest Rel-15 R5-80

AI: 5.3.4.

agreed [WTS] [JSN]
R5-185347 Discussion on FR2 TRx spurious test procedure discussion

revision of R5-184487

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185348 Correction to FR2 Spurious TC and inroduction of TRP measurement grid requirement pCR

revision of R5-184634

Anritsu 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185349 Discussion on test point selection for Frequency Error in FR2 discussion

revision of R5-184962

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185350 Addition of Frequency Error test case to TS 38.521-2 pCR

revision of R5-184960

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185351 Update across EN-DC RF test cases in TS 38.521-3 pCR Qualcomm Wireless GmbH 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185352 pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave pCR

revision of R5-184738

revised to R5-185212

MVG Industries 38.903 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.15

revised [WTS] [JSN]
R5-185353 Addition of Annex Global In-Channel TX-Test to 38.521-2 pCR

revision of R5-184954

revised to R5-185193

ROHDE & SCHWARZ 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

revised [WTS] [JSN]
R5-185354 Update of V2V TCs 6.5.2.3G.1 & 6.5.2.4G & 6.6.2.2G.1& 6.6.3G.1 CR

revision of R5-184181

Huawei, Hisilicon 36.521-1 15.2.0 CR#43461 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-185355 Update to test case 6.3.2G.1 for V2V services based on LTE sidelink CR

revision of R5-184418

KTL 36.521-1 15.2.0 CR#44011 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-185356 Update of Additional Maximum Power Reduction (A-MPR) for V2X Communication / Non-concurrent with E-UTRA uplink transmissions CR

revision of R5-184653

LG Electronics 36.521-1 15.2.0 CR#44391 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-185357 Update to Annex G for V2V/V2X Demod Perf tests CR

revision of R5-184662

Qualcomm Wireless GmbH 36.521-1 15.2.0 CR#44451 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-185358 Update of multiple V2V RF test cases for proper test mode setting CR

revision of R5-184740

Huawei,HiSilicon 36.521-1 15.2.0 CR#44541 catF LTE_SL_V2V-UEConTest Rel-15 R5-80

AI: 5.3.5.3

agreed [WTS] [JSN]
R5-185359 Correction of the title for OTDOA IOT tests CR ROHDE & SCHWARZ 37.571-3 15.2.0 CR#99 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.7

agreed [WTS] [JSN]
R5-185360 Update of V2X TCs 6.6.3G.2_1 & 6.6.3G.3_1 CR

revision of R5-184183

Huawei, Hisilicon 36.521-1 15.2.0 CR#43481 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185361 Update of V2X TCs 6.6.3G.2 & 6.6.3G.3 CR

revision of R5-184184

Huawei, Hisilicon 36.521-1 15.2.0 CR#43491 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185362 Correction to 36521-1-chapter 6_V2V and V2X CR

revision of R5-184193

Tejet 36.521-1 15.2.0 CR#43501 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185363 Cleaning up V2X test cases in TS 36.521-1 CR

revision of R5-184267

Huawei,HiSilicon 36.521-1 15.2.0 CR#43721 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185364 Update to test case 6.3.2G.2 for LTE-based V2X Services CR

revision of R5-184419

KTL 36.521-1 15.2.0 CR#44021 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185365 Update to test case 6.3.2G.3 for LTE-based V2X Services CR

revision of R5-184420

KTL 36.521-1 15.2.0 CR#44031 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185366 Update of V2X test case 6.7G.2 CR

revision of R5-184544

SRTC 36.521-1 15.2.0 CR#44131 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185367 Addition of new TC 6.6.2.3G.2 CR

revision of R5-184545

SRTC 36.521-1 15.2.0 CR#44141 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185368 Introduction of new V2X test case 6.5.2.1G.2 Error Vector Magnitude (EVM) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CR

revision of R5-184546

CAICT 36.521-1 15.2.0 CR#44151 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185369 Introduction of new V2X test case 6.5.2.1G.3 Error Vector Magnitude (EVM) for V2X Communication / Intra-band contiguous multi-carrier operation CR

revision of R5-184548

CAICT 36.521-1 15.2.0 CR#44161 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185370 Update to Additional Maximum Power Reduction (A-MPR) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CR

revision of R5-184655

LG Electronics 36.521-1 15.2.0 CR#44401 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185371 Updates to Align Initial Conditions with Other V2X Test Cases CR

revision of R5-184776

PCTEST Engineering Lab 36.521-1 15.2.0 CR#44581 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185372 Update of V2X Receiver Test Cases CR

revision of R5-184848

SGS Wireless 36.521-1 15.2.0 CR#44741 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185373 Update of V2X RRM CR

revision of R5-184847

SGS Wireless, Huawei 36.521-3 15.2.1 CR#22791 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-185374 Addition of test applicabilities of multiple V2X test cases CR

revision of R5-184269

Huawei,HiSilicon 36.521-2 15.2.0 CR#7381 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.4

agreed [WTS] [JSN]
R5-185375 Correction to 4x4 CA demodulation tests CR

revision of R5-184239

Anritsu 36.521-1 15.2.0 CR#43561 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.2

agreed [WTS] [JSN]
R5-185376 Add a new test condition for test case 8.13.3.1.2.5. CR

revision of R5-184905

CGC Inc. 36.521-2 15.2.0 CR#7631 catF LTE_4Rx_AP_DL_CA-UEConTest Rel-15 R5-80

AI: 5.3.10.3

agreed [WTS] [JSN]
R5-185377 TS 36.521-1 Annex F update for UE cat 1bis test cases CR

revision of R5-184874

Qualcomm Incorporated 36.521-1 15.2.0 CR#44751 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-185378 LTE_New test case LTE_New test case 6.3.4EB ONOFF time mask for UE category 1bis CR

revision of R5-184876

Qualcomm Incorporated 36.521-1 15.2.0 CR#44761 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-185379 LTE_New test case 6.3.5EB Power Control for UE category 1bis CR

revision of R5-184877

Qualcomm Incorporated 36.521-1 15.2.0 CR#44771 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-185380 LTE_New test case 6.3.2EB Minimum Output Power for UE category 1bis CR

revision of R5-184879

Qualcomm Incorporated 36.521-1 15.2.0 CR#44791 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-185381 LTE_New test case 6.2.4EB Additional Maximum Power Reduction (A-MPR) for UE category 1bis CR

revision of R5-184881

Qualcomm Incorporated 36.521-1 15.2.0 CR#44811 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-185382 LTE_New test case 6.3.3EB UE Transmit OFF power for UE category 1bis CR

revision of R5-184878

Qualcomm Incorporated 36.521-1 15.2.0 CR#44781 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-185383 LTE_New test case 6.2.5EB Configured UE transmitted Power for UE category 1bis CR

revision of R5-184880

Qualcomm Incorporated 36.521-1 15.2.0 CR#44801 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-185384 LTE_New test case 6.2.3EB Maximum Power Reduction (MPR) for UE category 1bis CR

revision of R5-184885

Qualcomm Incorporated 36.521-1 15.2.0 CR#44821 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-185385 Cat1bis new RF test case: Transmit intermodulation for UE category 1bis CR

revision of R5-184940

Qualcomm Austria 36.521-1 15.2.0 CR#44901 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.2

agreed [WTS] [JSN]
R5-185386 Completion of Chapter 7 RRM cat 1bis test cases CR

revision of R5-184202

Qualcomm UK Ltd 36.521-3 15.2.1 CR#22321 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-185387 Introduction of FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO CR

revision of R5-184646

TTA 36.521-1 15.2.0 CR#44341 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-80

AI: 5.3.15.2

agreed [WTS] [JSN]
R5-185388 Introduction of TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO CR

revision of R5-184648

TTA 36.521-1 15.2.0 CR#44361 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-80

AI: 5.3.15.2

agreed [WTS] [JSN]
R5-185389 Applicabilities addition of test cases 8.3.1.1.9 and 8.3.2.1.10 CR

revision of R5-184649

TTA 36.521-2 15.2.0 CR#7531 catF LTE_EBF_FDMIMO-UEConTest Rel-15 R5-80

AI: 5.3.15.3

agreed [WTS] [JSN]
R5-185390 DL and UL RMC updated for FR1 tests pCR

revision of R5-184573

Bureau Veritas 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185391 Test Tolerance: Updates to Cat1bis inter frequency RSRP accuracy tests and Annex F CR

revision of R5-184165

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#22271 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-185392 Test Tolerance: Updates to Cat1bis inter frequency RSRQ accuracy tests and Annex F CR

revision of R5-184166

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#22281 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-185393 Test Tolerance: Updates to Cat1bis intra frequency RSRP accuracy tests and Annex F CR

revision of R5-184167

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#22291 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-185394 Test Tolerance: Updates to Cat1bis intra frequency RSRQ accuracy tests and Annex F CR

revision of R5-184168

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#22301 catF LTE_UE_cat_1RX-UEConTest Rel-15 R5-80

AI: 5.3.11.4

agreed [WTS] [JSN]
R5-185395 Test Tolerance Analysis for RRM TC 9.1.1.1_2 and 9.1.2.1_2 CR

revision of R5-184147

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3831 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185396 Test Tolerance Analysis for RRM TC 9.1.1.2_2 and 9.1.2.2_2 CR

revision of R5-184155

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3861 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185397 Test Tolerance Analysis for RRM TC 9.1.3.1_2 and 9.1.4.1_2 CR

revision of R5-184156

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3871 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185398 Test Tolerance Analysis for RRM TC 9.1.3.2_2 and 9.1.4.2_2 CR

revision of R5-184157

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3881 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185399 Test Tolerance Analysis for RRM TC 9.1.5.1_2 CR

revision of R5-184158

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3891 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185400 Test Tolerance Analysis for RRM TC 9.1.5.2_2 CR

revision of R5-184159

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3901 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185401 Test Tolerance Analysis for RRM TC 9.2.3.1_2 and 9.2.4.1_2 CR

revision of R5-184161

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3921 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185402 Test Tolerance Analysis for RRM TC 9.2.3.2_2 and 9.2.4.2_2 CR

revision of R5-184162

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3931 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185403 Test Tolerance Analysis for RRM TC 9.2.4A.1_2 CR

revision of R5-184163

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3941 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185404 Test Tolerance Analysis for RRM TC 9.2.4A.2_2 CR

revision of R5-184164

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3951 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185405 Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 CR

revision of R5-184185

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#4001 catF LTE_UE_cat_1RX-UEConTest Rel-14 R5-80

AI: 5.3.11.8

agreed [WTS] [JSN]
R5-185406 Introduction of Additional spurious emissions for UL 256QAM CR

revision of R5-184640

TTA 36.521-1 15.2.0 CR#44311 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

agreed [WTS] [JSN]
R5-185407 Addition of applicability for TC6.6.3.3_2 CR

revision of R5-184643

TTA 36.521-2 15.2.0 CR#7511 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.3

agreed [WTS] [JSN]
R5-185408 TP for updating test case 6.2.3 UE AMPR pCR

revision of R5-184754

Ericsson LM 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185409 Addition of NB-IOT Guardband Test Frequencies for 10 MHz CR

revision of R5-184111

ROHDE & SCHWARZ 36.508 15.2.0 CR#11811 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.1

agreed [WTS] [JSN]
R5-185410 Discussion on approach for defining EN-DC tests in TS 38.521-3 discussion

revised to R5-185468

Qualcomm Wireless GmbH 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

revised [WTS] [JSN]
R5-185411 Update of FR1 test case 6.2.2 pCR

revision of R5-184863

CAICT 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185412 TP for updating TR 38.905 with EVM test point analysis pCR

revision of R5-184946

ROHDE & SCHWARZ 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185413 5G NR_FR1_Text_update for TX Spurious Emission pCR

revision of R5-184865

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185414 Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-1 pCR

revision of R5-184875

Keysight Technologies UK Ltd 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185415 Update to ACS and in-band blocking test cases in TS 38.521-1 pCR

revision of R5-184904

Keysight Technologies UK Ltd 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185416 Correction to nrs-CRS-PowerOffset-r13 for NB-IOT OTDOA tests CR

revision of R5-184112

ROHDE & SCHWARZ 37.571-1 15.2.0 CR#2681 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.6

agreed [WTS] [JSN]
R5-185417 NB-IOT OTDOA reporting delay test cases not testable CR

revision of R5-184113

ROHDE & SCHWARZ 37.571-1 15.2.0 CR#2691 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.6

agreed [WTS] [JSN]
R5-185418 Correction of the applicability for OTDOA IOT tests CR

revision of R5-184132

ROHDE & SCHWARZ 37.571-3 15.2.0 CR#971 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.7

withdrawn [WTS] [JSN]
R5-185419 Changes to eMTC OTDOA tests CR

revision of R5-184114

ROHDE & SCHWARZ 37.571-1 15.2.0 CR#2701 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.5

agreed [WTS] [JSN]
R5-185420 Addition of Assistance Data for OTDOA eMTC tests CR

revision of R5-184131

ROHDE & SCHWARZ 37.571-5 15.2.0 CR#1841 catF LTE_feMTC-UEConTest Rel-15 R5-80

AI: 5.3.16.7

agreed [WTS] [JSN]
R5-185421 Addition of missing assistance data for modernized GPS and the GPS L5 signal for LTE minimum performance sub-test 4 CR

revision of R5-184028

Spirent Communications 37.571-5 15.2.0 CR#1791 catF TEI9_Test Rel-15 R5-80

AI: 5.5.11

agreed [WTS] [JSN]
R5-185422 Alignment of Annex numbering with core spec pCR

revision of R5-184882

Qualcomm Wireless GmbH 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185423 Discussion on Uplink configuration for NR Transmit Intermodulation in FR1 discussion

revision of R5-184497

KTL 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185424 Addition of TT analysis of eHST FDD Intra-frequency event reporting. CR

revision of R5-184148

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3841 catF LTE_high_speed-UEConTest Rel-14 R5-80

AI: 5.3.9.5

agreed [WTS] [JSN]
R5-185425 Addition of TT analysis of V2X uplink timing test case CR

revision of R5-184149

Qualcomm Europe Inc. (Spain) 36.903 14.1.0 CR#3851 catF LTE_V2X-UEConTest Rel-14 R5-80

AI: 5.3.12.6

agreed [WTS] [JSN]
R5-185426 New test case: 6.2.3A.3_2, Maximum Power Reduction (MPR) for CA (intra-band non-contiguous DL CA and UL CA) for UL 256QAM CR

revision of R5-184326

Ericsson 36.521-1 15.2.0 CR#43791 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

agreed [WTS] [JSN]
R5-185427 New UL 256QAM test case: 6.6.2.2_2 Additional Spectrum Emission Mask for UL 256QAM CR

revision of R5-184697

Ericsson 36.521-1 15.2.0 CR#44491 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

agreed [WTS] [JSN]
R5-185428 Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 CR

revision of R5-184725

Ericsson 36.521-2 15.2.0 CR#7551 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.3

agreed [WTS] [JSN]
R5-185429 Test Point Analysis for Reference sensitivity level for EN-DC discussion

revision of R5-184922

Qualcomm Incorporated R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185430 TP for updating TR38.905 with UE AMPR for NS_04 Intra-band contigous EN-DC pCR

revised to R5-185216

Ericsson LM 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

revised [WTS] [JSN]
R5-185431 eLAA_correction to 6.3.5A.1.2 and 6.3.5A.2.2 CR

revision of R5-184194

Tejet 36.521-1 15.2.0 CR#43511 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 5.3.7.2

agreed [WTS] [JSN]
R5-185432 eLAA_Update to 6.6.3.1A.2 CR

revision of R5-184196

Tejet 36.521-1 15.2.0 CR#43531 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 5.3.7.2

agreed [WTS] [JSN]
R5-185433 eLAA: Updates to Adjacent Channel Leakage power Ratio for CA CR

revision of R5-184694

Qualcomm Europe Inc. (Spain) 36.521-1 15.2.0 CR#44471 catF LTE_eLAA-UEConTest Rel-15 R5-80

AI: 5.3.7.2

agreed [WTS] [JSN]
R5-185434 Addition of new UL 256QAM test case - A-MPR for 2UL CA intra-band contiguous CR

revision of R5-184556

CETECOM GmbH 36.521-1 15.2.0 CR#44191 catF LTE_UL_CAP_enh-UEConTest Rel-15 R5-80

AI: 5.3.19.2

agreed [WTS] [JSN]
R5-185435 Correction of test points and test requirements for TC 6.2.4A.2_1 CR

revision of R5-184555

CETECOM GmbH 36.521-1 15.2.0 CR#44181 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-185436 Correction of test points and test requirements for TC 6.2.4A.2 CR

revision of R5-184554

CETECOM GmbH 36.521-1 15.2.0 CR#44171 catF TEI11_Test, LTE_CA_Rel12_2UL-UEConTest Rel-15 R5-80

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-185437 Test point and test requirements analysis for CA_3A-41A, 41A-42A,3A-42A spurious test cases CR

revision of R5-184833

Huawei, Hisilicon 36.905 15.1.0 CR#1551 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.

agreed [WTS] [JSN]
R5-185438 Introcution of V2X TC 6.5.2.4G.3 CR

revision of R5-184178

Huawei, Hisilicon 36.521-1 15.2.0 CR#43431 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185439 Updation of V2X TC 6.6.2.2G.2 CR

revision of R5-184179

Huawei, Hisilicon 36.521-1 15.2.0 CR#43441 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185440 Updation of V2X TCs 6.5.2.3G.2 and 6.5.2.3G.3 CR

revision of R5-184180

Huawei, Hisilicon 36.521-1 15.2.0 CR#43451 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185441 TT statements for V2X TCs CR

revision of R5-184182

Huawei, Hisilicon 36.521-1 15.2.0 CR#43471 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185442 Applicability and ICS for CA RF and RRM test cases CR Bureau Veritas, Ericsson LM, KT Corp., Vodafone GmbH, Huawei,HiSilicon, SRTC, KDDI Corporation, SGS Wireless, CGC Inc. 36.521-2 15.2.0 CR#768 catF TEI10_Test Rel-15 R5-80

AI: 5.3.2.3

agreed [WTS] [JSN]
R5-185443 Correction to power level for FR1 RF tests CR

revision of R5-184486

Anritsu 38.508-1 15.0.0 CR#521 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185444 Updates of FR1 TRx MU in Annex F pCR

revision of R5-184392

NTT DOCOMO, INC. 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185445 Update to FR1 test case 6.5.4 Transmit intermodulation pCR

revision of R5-184479

KTL, MTCC 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185446 Introduction of 6.2C.1 Configured transmitted power for SUL pCR

revision of R5-184823

Huawei, Hisilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185447 5G_NR FR1_Text_update for_RX_sensitivity pCR

revision of R5-184859

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185448 Corrections to A-MPR values for NS_27 CR

revision of R5-184799

Rohde & Schwarz 36.521-1 15.2.0 CR#44611 catF TEI14_Test Rel-15 R5-80

AI: 5.4.1.2.1

agreed [WTS] [JSN]
R5-185449 Correction to Figure A.64 to cater for CC >= 3 CR

revision of R5-184237

Anritsu 36.508 15.2.0 CR#11851 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.1

agreed [WTS] [JSN]
R5-185450 Correction to message exception for 8.2.1.4.2_A.4 CR

revision of R5-184241

Anritsu 36.521-1 15.2.0 CR#43581 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185451 Editorial correction to RMC name in PHICH demodulation test CR

revision of R5-184245

Anritsu 36.521-1 15.2.0 CR#43621 catF TEI10_Test Rel-15 R5-80

AI: 5.4.1.2.3

agreed [WTS] [JSN]
R5-185452 Corrections to CA Test Configuration Table in section 7 CR

revision of R5-184248

Anritsu 36.521-1 15.2.0 CR#43651 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185453 Addition of applicability of RRM IncMon test cases CR

revision of R5-184519

Ericsson 36.521-2 15.2.0 CR#7441 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.5

agreed [WTS] [JSN]
R5-185454 Addition of antenna diagrams for IncMon RRM test cases CR

revision of R5-184502

Ericsson 36.508 15.2.0 CR#11911 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.4

agreed [WTS] [JSN]
R5-185455 Addition of message content for RRM IncMon test cases CR

revision of R5-184515

Ericsson 36.508 15.2.0 CR#11921 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.4

agreed [WTS] [JSN]
R5-185456 TC Group definition for RRM IncMon test cases CR

revision of R5-184171

Ericsson 36.903 14.1.0 CR#3961 catF LTE_UTRA_IncMon-UEConTest Rel-14 R5-80

AI: 5.3.1.7

agreed [WTS] [JSN]
R5-185457 Addition of RRM IncMon new Test Case 8.4.8 CR

revision of R5-184589

Ericsson 36.521-3 15.2.1 CR#22661 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185458 Addition of RRM IncMon new Test Case 8.4.9 CR

revision of R5-184590

Ericsson 36.521-3 15.2.1 CR#22671 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185459 Addition of RRM IncMon new Test Case 8.5.8 CR

revision of R5-184716

Ericsson 36.521-3 15.2.1 CR#22691 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185460 Addition of RRM IncMon new Test Case 8.6.3 CR

revision of R5-184717

Ericsson 36.521-3 15.2.1 CR#22701 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185461 Addition of RRM IncMon new Test Case 8.7.5 CR

revision of R5-184718

Ericsson 36.521-3 15.2.1 CR#22711 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185462 Addition of RRM IncMon new Test Case 8.7A.1 CR

revision of R5-184719

Ericsson 36.521-3 15.2.1 CR#22721 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185463 Addition of RRM IncMon new Test Cases 4.2.1 and 4.2.11 CR

revision of R5-184720

Ericsson 36.521-3 15.2.1 CR#22731 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185464 Addition of RRM IncMon new Test Case 4.3.1.5 CR

revision of R5-184721

Ericsson 36.521-3 15.2.1 CR#22741 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185465 Addition of RRM IncMon new Test Case 4.3.2A CR

revision of R5-184722

Ericsson 36.521-3 15.2.1 CR#22751 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185466 Addition of RRM IncMon new Test Case 4.3.3A CR

revision of R5-184723

Ericsson 36.521-3 15.2.1 CR#22761 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185467 Addition of RRM IncMon new Test Case 4.3.4.4 CR

revision of R5-184724

Ericsson 36.521-3 15.2.1 CR#22771 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185468 Discussion on approach for defining EN-DC tests in TS 38.521-3 discussion

revision of R5-185410

Qualcomm Wireless GmbH 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185469 TP for updating test case 6.2B.3.1 UE AMPR for Intra-band contigous EN-DC pCR

revision of R5-184757

Ericsson LM 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185470 TP for updating test case 6.2B.3.2 UE AMPR for Intra-band non-contigous EN-DC pCR

revision of R5-184758

Ericsson LM 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185471 TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC pCR

revision of R5-184759

revised to R5-185200

Ericsson LM 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185472 Update of TC 6.2B.1.1 pCR

revision of R5-184826

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185473 Introduction of TC 6.2B.1.2 pCR

revision of R5-184827

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185474 Update of 6.2B.1.3 pCR

revision of R5-184828

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185475 Introduction of TC 7.4B.1 pCR

revision of R5-184829

revised to R5-185201

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185476 Introduction of 7.4B.2 pCR

revision of R5-184830

revised to R5-185202

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185477 Introduction of 7.4B.3 pCR

revision of R5-184831

revised to R5-185203

Huawei, Hisilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185478 Discussion on OBW, SEM and ACLR for EN-DC interband FR1 discussion

revision of R5-184852

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185479 Update Occupied Bandwidth for interband EN-DC within FR1 pCR

revision of R5-184855

Keysight Technologies UK Ltd 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185480 Update SEM interband EN-DC within FR1 pCR

revision of R5-184857

Keysight Technologies UK Ltd 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185481 Update ACLR for interband EN-DC within FR1 pCR

revision of R5-184860

Keysight Technologies UK Ltd 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185482 5G NR_EN_DC with FR1_Text update for RX sensitivity pCR

revision of R5-184869

revised to R5-185204

Qualcomm Incorporated 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185483 Editorial corrections 9.1.46 CR

revision of R5-184103

ROHDE & SCHWARZ 36.521-3 15.2.1 CR#22171 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-185484 Editorial corrections 9.1.50 CR

revision of R5-184104

ROHDE & SCHWARZ 36.521-3 15.2.1 CR#22181 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-185485 Update of RRM IncMon test cases 8.3.7, 8.3.8, 8.3.9, 8.4.7 including test tolerances CR

revision of R5-184169

Ericsson 36.521-3 15.2.1 CR#22311 catF LTE_UTRA_IncMon-UEConTest Rel-15 R5-80

AI: 5.3.1.6

agreed [WTS] [JSN]
R5-185486 CA_3A-18A and 1A-3A-18A - Updates of A.4.6.3 CR

revision of R5-184645

KDDI Corporation 36.521-2 15.2.0 CR#7521 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.3

withdrawn [WTS] [JSN]
R5-185487 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission pCR

revision of R5-184872

revised to R5-185205

Qualcomm Incorporated 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185488 Applicability for DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 CR

revision of R5-184542

SRTC 36.521-2 15.2.0 CR#7451 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.3

withdrawn [WTS] [JSN]
R5-185489 FR2_TxSpurious_TestPointAnalysis discussion

revision of R5-184371

Qualcomm Europe Inc. (Spain) Rel-15 R5-80

AI: 5.3.13.5

noted [WTS] [JSN]
R5-185490 FR2_TxSpurious_TestConfig_38.521-2 pCR

revision of R5-184372

Qualcomm Europe Inc. (Spain) 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

approved [WTS] [JSN]
R5-185491 Test Point analysis for FR2 TxSpurious test case pCR

revision of R5-184924

Qualcomm Europe Inc. (Spain) 38.905 0.2.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.16

approved [WTS] [JSN]
R5-185492 Quality of Quiet Zone Results for IFF other

revision of R5-184858

Keysight Technologies UK Ltd R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185493 Correction of test configuration of CA_20A-42A REFSENS CR

revision of R5-184283

Huawei,HiSilicon 36.521-1 15.2.0 CR#43731 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185494 Update of 7.3A.5 REFSENS for Rel-13 CA configurations CR

revision of R5-184284

Huawei,HiSilicon 36.521-1 15.2.0 CR#43741 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185495 Update of FR1 test case 6.3.3.2 pCR

revision of R5-184302

Huawei,HiSilicon 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185496 5G NR_FR1_Text_update for TX Spurious Emission UE-Co-exist pCR

revision of R5-184867

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185497 New test case 6.3.5FA.1 Power Control Absolute power tolerance for category NB1 and NB2/Power Class 6 CR

revision of R5-184403

CAICT 36.521-1 15.2.0 CR#43921 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

agreed [WTS] [JSN]
R5-185498 New test case 6.3.5FA.2 Power Control Relative power tolerance for category NB1 and NB2/Power Class 6 CR

revision of R5-184405

CAICT 36.521-1 15.2.0 CR#43931 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

agreed [WTS] [JSN]
R5-185499 New test case 6.3.5FA.3 Aggregate power control tolerance for category NB1 and NB2/Power Class 6 CR

revision of R5-184406

CAICT 36.521-1 15.2.0 CR#43941 catF NB_IOTenh-UEConTest Rel-15 R5-80

AI: 5.3.14.3

agreed [WTS] [JSN]
R5-185500 5G NR_Proposal of TS38.521-1 annex C.0_Downlink signal levels pCR

revision of R5-184920

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185501 5G NR_FR1_Text_Update_for_TX_ Additional spurious emissions pCR

revision of R5-184921

Qualcomm Incorporated 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185502 Addition of new CA band combination – Updates of test points analysis CR

revision of R5-184838

SGS Wireless 36.905 15.1.0 CR#1561 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.

agreed [WTS] [JSN]
R5-185503 Add Clause 7.5B.1 into TS 38.521-3 pCR

revision of R5-184563

CMCC 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185504 Add Clause 7.5B.2 into TS 38.521-3 pCR

revision of R5-184564

CMCC 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185505 Add Clause 7.5B.3 into TS 38.521-3 pCR

revision of R5-184565

CMCC 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185506 Addition of new 3CA band combination for CA REFSENS CR

revision of R5-184845

SGS Wireless 36.521-1 15.2.0 CR#44731 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-185507 Addition of 6.2B.4.1.3 Configured OP for Intre-Band within FR1 pCR

revision of R5-184746

Huawei,HiSilicon 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185508 Introduction of Additional Maximum Power Reduction (A-MPR) for CA (3UL CA) CR

revision of R5-184841

SGS Wireless 36.521-1 15.2.0 CR#44691 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185509 Introduction of General ON/OFF time mask for CA (3UL CA) CR

revision of R5-184843

SGS Wireless 36.521-1 15.2.0 CR#44711 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185510 Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC pCR

revision of R5-185302

revised to R5-185206

SGS Wireless 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185511 Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC pCR

revision of R5-185303

revised to R5-185207

SGS Wireless 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185512 Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 pCR

revision of R5-185304

revised to R5-185208

SGS Wireless 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

revised [WTS] [JSN]
R5-185513 Optimization of test configuration table for Rx CA test cases discussion

revision of R5-184766

NTT DOCOMO, INC. LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.11

noted [WTS] [JSN]
R5-185514 Updates of receiver test cases for CA_XA-YE CR

revision of R5-184511

NTT DOCOMO, INC. 36.521-1 15.2.0 CR#44081 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-185515 Updates of receiver test cases for CA_XA-YD CR

revision of R5-184516

NTT DOCOMO, INC. 36.521-1 15.2.0 CR#44091 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-185516 Addition of Band 74 information into TS 34.121-1 CR

revision of R5-184389

NTT DOCOMO, INC. 34.121-1 15.1.0 CR#16561 catF LTE_FDD_L_band-UEConTest Rel-15 R5-80

AI: 5.3.18.1

agreed [WTS] [JSN]
R5-185517 Updates of Band 74 information about Tx test cases in TS 36.521-1 CR

revision of R5-184390

NTT DOCOMO, INC. 36.521-1 15.2.0 CR#43901 catF LTE_FDD_L_band-UEConTest Rel-15 R5-80

AI: 5.3.18.3

agreed [WTS] [JSN]
R5-185518 Proposal on MU and TT table format in TS 38.521-2 discussion

revision of R5-184397

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185519 Updates of FR2 TRx MU and TT in Annex pCR

revision of R5-184398

NTT DOCOMO, INC. 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185520 Addition of TRx MU and TT in TS 38.521-3 Annex pCR

revision of R5-184402

NTT DOCOMO, INC. 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185521 OCNG Patterns updated for FR1 tests pCR

revision of R5-184575

Bureau Veritas 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185522 Update Clause in 6.2.5EA Configured UE transmitted Power for UE category M1 CR

revision of R5-184098

Qualcomm Incorporated 36.521-1 15.2.0 CR#43381 catF TEI13_Test, LTE_MTCe2_L1-UEConTest Rel-15 R5-80

AI: 5.4.1.2

agreed [WTS] [JSN]
R5-185523 FR2_UE_BeamlockMode_IE_38.509 CR

revision of R5-184908

Qualcomm Europe Inc. (Spain) 38.509 15.0.0 CR#31 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.3

agreed [WTS] [JSN]
R5-185524 Introduction of TC 7.6.3 Out-of-band blocking pCR

revision of R5-184490

CAICT 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

approved [WTS] [JSN]
R5-185525 Treatment of power supply cable for FR2 UE tests discussion

revision of R5-184422

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185526 Offset in quality of quiet zone evaluation discussion

revision of R5-184429

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185527 Testability issue of low PSD test cases in FR2 discussion

revision of R5-184431

Anritsu 5GS_NR_LTE-UEConTest R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185528 Table format correct and removed redundant line for RF clause 7 test cases CR

revision of R5-184583

Bureau Veritas 36.521-2 15.2.0 CR#7481 catF TEI8_Test Rel-15 R5-80

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-185529 Test approach of EN-DC Rx tests with multiple LTE/NR CCs discussion

revision of R5-184485

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185530 Clarification on frame structure in 4Rx performance and CSI test principles sections CR

revision of R5-184669

Qualcomm Wireless GmbH 36.521-1 15.2.0 CR#44461 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.2

agreed [WTS] [JSN]
R5-185531 MU and TT of EN-DC test cases in TS 38.521-3 discussion

revision of R5-184400

NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185532 Proposal for 5G NR EVM Test Tolerance discussion

revision of R5-184883

Qualcomm Incorporated R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185533 Discussion on UL RMC for FR2 spurious test discussion

revision of R5-184488

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185534 Discussion on Test Tolerance for FR2 discussion

revision of R5-184803

Intel Corporation (UK) Ltd, Apple Inc. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185535 Update to General ON/OFF time mask for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CR

revision of R5-184658

LG Electronics. 36.521-1 15.2.0 CR#44431 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.3

agreed [WTS] [JSN]
R5-185536 Correction of GNSS information for V2X tests CR

revision of R5-184039

Spirent Communications, European Commission 36.521-3 15.2.0 CR#22121 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-185537 CR of CQI reporting test case 9.2.1.1.4.2 CR

revision of R5-184233

Huawei, Hisilicon 36.521-1 15.2.0 CR#43541 catF TEI8_Test Rel-15 R5-80

AI: 5.4.1.2.3

withdrawn [WTS] [JSN]
R5-185538 Introduction of new test case TC 6.2.5A.4 Configured UE transmitted Output Power for CA (3UL CA) CR

revision of R5-184601

7LAYERS GmbH 36.521-1 15.2.0 CR#44251 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185539 Introduction of new test case TC 6.6.2.1A.4 Spectrum emission mask for CA (3UL CA) CR

revision of R5-184602

7LAYERS GmbH 36.521-1 15.2.0 CR#44261 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185540 Update of test case TC 6.7A.4 "Transmit intermodulation for CA (3DL CA and 3UL CA)" CR

revision of R5-184606

7LAYERS GmbH 36.521-1 15.2.0 CR#44291 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.2

agreed [WTS] [JSN]
R5-185541 Correction of applicability to TS 36.521-2 for HPUE RF test cases CR

revision of R5-184336

CMCC 36.521-2 15.2.0 CR#7421 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-185542 CA_3A-18A - Updates of some Tx test cases CR

revision of R5-184642

KDDI Corporation 36.521-1 15.2.0 CR#44321 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.2

agreed [WTS] [JSN]
R5-185543 CA_3A-18A - Updates of test points analysis CR

revision of R5-184641

KDDI Corporation 36.905 15.1.0 CR#1511 catF LTE_CA_R15-UEConTest Rel-15 R5-80

AI: 5.3.17.

agreed [WTS] [JSN]
R5-185544 New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes CR

revision of R5-184868

Intel Corporation (UK) Ltd 36.521-3 15.2.1 CR#22801 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-185545 New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes CR

revision of R5-184870

Intel Corporation (UK) Ltd 36.521-3 15.2.1 CR#22811 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-185546 New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes CR

revision of R5-184871

Intel Corporation (UK) Ltd 36.521-3 15.2.1 CR#22821 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-185547 New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes CR

revision of R5-184873

Intel Corporation (UK) Ltd 36.521-3 15.2.1 CR#22831 catF LTE_CA_Rel13-UEConTest Rel-15 R5-80

AI: 5.3.2.4

agreed [WTS] [JSN]
R5-185548 Band 41 HPUE Maximum Output Power CR

revision of R5-184335

revised to R5-185185

CMCC 36.521-1 15.2.0 CR#43801 catF TEI13_Test Rel-15 R5-80

AI: 5.4.1.2

revised [WTS] [JSN]
R5-185549 Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2 CR

revision of R5-184808

Intel Corporation (UK) Ltd 36.521-2 15.2.0 CR#7571 catF TEI14_Test Rel-15 R5-80

AI: 5.4.1.3

agreed [WTS] [JSN]
R5-185550 Discussion on testing of fallback CA configurations in Rx CA test cases discussion

revision of R5-184889

Ericsson TEI10_Test Rel-15 R5-80

AI: 5.4.1.11

noted [WTS] [JSN]
R5-185551 Discussion paper on the applicability of the tests in 37.571-1 for all types and categories of UE discussion

revision of R5-184051

Spirent Communications, European Commission R5-80

AI: 5.5.9

noted [WTS] [JSN]
R5-185552 Applicability of tests for types and Categories of UE CR

revision of R5-184083

Spirent Communications, European Commission 37.571-1 15.2.0 CR#2671 catF TEI12_Test Rel-15 R5-80

AI: 5.5.9

agreed [WTS] [JSN]
R5-185553 Proposal for LTE 256QAM EVM Test Tolerance discussion

revision of R5-184898

Qualcomm Incorporated R5-80

AI: 5.4.1.2

noted [WTS] [JSN]
R5-185554 Test tolerance update of V2X uplink timing test cases CR

revision of R5-184150

Qualcomm Europe Inc. (Spain) 36.521-3 15.2.1 CR#22251 catF LTE_V2X-UEConTest Rel-15 R5-80

AI: 5.3.12.5

agreed [WTS] [JSN]
R5-185555 FR2_UE_BeamlockInvoke_38.521-2 pCR

revision of R5-184373

Qualcomm Europe Inc. (Spain) 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185556 FR2_UE_BeamlockInvoke_38.521-3 pCR

revision of R5-184810

Qualcomm Europe Inc. (Spain) 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185557 FR2_UE_BeamlockProcedure_38.508-1 CR

revision of R5-184909

Qualcomm Europe Inc. (Spain) 38.508-1 15.0.0 CR#851 catF 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.1

agreed [WTS] [JSN]
R5-185558 Discussion_38.521-3_ApplicabilityRules discussion

revision of R5-184361

Qualcomm Europe Inc. (Spain) Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185559 FR2_38.521-3_Applicability_SpuriousEmissions pCR

revision of R5-184362

Qualcomm Europe Inc. (Spain) 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

withdrawn [WTS] [JSN]
R5-185560 FR2_38.522_Applicability_SpuriousEmissions pCR

revision of R5-184363

Qualcomm Europe Inc. (Spain) 38.522 0.3.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.8

withdrawn [WTS] [JSN]
R5-185561 Discussion_FR2_StoreTxRxBeamPeakCoordinates discussion

revision of R5-184368

Qualcomm Europe Inc. (Spain) Rel-15 R5-80

AI: 5.3.13.5

noted [WTS] [JSN]
R5-185562 FR2_StoreTxRxBeamPeakCoordinates_38.521-2 pCR

revision of R5-184369

Qualcomm Europe Inc. (Spain) 38.521-2 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.5

approved [WTS] [JSN]
R5-185563 FR2_StoreTxRxBeamPeakCoordinates_38.521-3 pCR

revision of R5-184370

Qualcomm Europe Inc. (Spain) 38.521-3 0.5.0 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.6

approved [WTS] [JSN]
R5-185564 FR1 TT Way Forward update discussion

revision of R5-184068

Telecom Italia S.p.A. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]
R5-185565 Updates of FR1 TRx TT in Annex F pCR

revision of R5-184395

NTT DOCOMO, INC. 38.521-1 0.5.1 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.4

agreed [WTS] [JSN]
R5-185566 Discussion on TT for Max Output Power TC Requirements for FR2 discussion

revision of R5-184804

Intel Corporation (UK) Ltd, Apple Inc. 5GS_NR_LTE-UEConTest Rel-15 R5-80

AI: 5.3.13.17

noted [WTS] [JSN]

1503 documents (1.0734860897064 seconds)