Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-184000 | Agenda - opening session | agenda | WG Chairman |
R5-80 AI: 1 |
approved | [WTS] [JSN] | |||
R5-184001 | Agenda - mid week session | agenda | WG Chairman |
R5-80 AI: 1 |
approved | [WTS] [JSN] | |||
R5-184002 | Agenda - closing session | agenda | WG Chairman |
R5-80 AI: 1 |
noted | [WTS] [JSN] | |||
R5-184003 | RAN5#80 Session Programme | agenda | WG Chairman |
R5-80 AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-184004 | RAN5 Leadership Team | other | WG Chairman |
R5-80 AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-184005 | RAN5#79 WG Minutes | report | ETSI Secretariat |
R5-80 AI: 2.1 |
approved | [WTS] [JSN] | |||
R5-184006 | RAN5#79 WG Action Points |
report revised to R5-184998 |
ETSI Secretariat |
R5-80 AI: 2.1 |
revised | [WTS] [JSN] | |||
R5-184007 | draft RAN5#80 meeting report | report | ETSI Secretariat |
R5-80 AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-184008 | Latest RAN Plenary notes | report | WG Chairman |
R5-80 AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-184009 | Latest RAN Plenary draft Report | report | WG Chairman |
R5-80 AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-184010 | Post Plenary Active Work Item update | other | ETSI Secretariat |
R5-80 AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-184011 | RAN5 SR to RP#80 | report | WG Chairman |
R5-80 AI: 2.2 |
noted | [WTS] [JSN] | |||
R5-184012 | TF160 SR to RP#80 | report | WG Chairman |
R5-80 AI: 2.2 |
noted | [WTS] [JSN] | |||
R5-184013 | RAN Chair Report to SA#80 | report | WG Chairman |
R5-80 AI: 2.2 |
noted | [WTS] [JSN] | |||
R5-184014 | RAN5#80 LS Template | other | WG Chairman |
R5-80 AI: 4.3 |
noted | [WTS] [JSN] | |||
R5-184015 | RAN5 5GS Text Proposal / pCR cover sheet template | other | Ericsson |
R5-80 AI: 4.3 |
noted | [WTS] [JSN] | |||
R5-184016 | Meeting schedule for 2018-19 | other | WG Chairman |
R5-80 AI: 4.4 |
noted | [WTS] [JSN] | |||
R5-184017 | WI Progress and Target Completion Date Review | other | WG Chairman |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |||
R5-184018 | Review deadlines for next quarter | other | WG Chairman |
R5-80 AI: 7.6 |
noted | [WTS] [JSN] | |||
R5-184019 | LS on Settings for verifying RF requirements for Coherent UL MIMO |
LS in source LS: R4-1806532 |
TSG WG RAN4 | NR_newRAT |
R5-80 AI: 5.2 |
noted | [WTS] [JSN] | ||
R5-184020 | LS on generic 3CC to 5CC RRM test cases |
LS in source LS: R4-1807951 |
TSG WG RAN4 | TEI13_Test |
R5-80 AI: 5.2 |
noted | [WTS] [JSN] | ||
R5-184021 | Reply LS on the applicable requirements of the Power Class 2 capable UE |
LS in LS is reply to R5-182022 source LS: R4-1808210 |
TSG WG RAN4 | TEI8_Test |
R5-80 AI: 5.2 |
noted | [WTS] [JSN] | ||
R5-184022 | LS on Measurement Grids |
LS in source LS: R4-1808410 |
TSG WG RAN4 | FS_NR_test_methods |
R5-80 AI: 5.2 |
noted | [WTS] [JSN] | ||
R5-184023 | LS on Introducing optional channel bandwidth |
LS in source LS: R4-1808508 |
TSG WG RAN4 | NR_newRAT-Core |
R5-80 AI: 3 |
noted | [WTS] [JSN] | ||
R5-184024 | Definition of and test methods for OTA unwanted emissions of IMT radio equipment |
LS in source LS: 5D_TD_571Rev1 LS reply in R5-185147, R5-185147 |
ITU-R Working Party 5D |
R5-80 AI: 7.5 |
noted | [WTS] [JSN] | |||
R5-184025 | LS reply on RAN4-RAN5 5G-NR RF pending issues: RMCs, OCNG patterns and FR2 RSRP accuracy |
LS in LS is reply to R5-183931 source LS: R4-1809345 |
TSG WG RAN4 | NR_newRAT-Core | Rel-15 |
R5-80 AI: 5.2 |
noted | [WTS] [JSN] | |
R5-184026 | LS reply on RAN4-RAN5 5G-NR RF pending issues |
LS in source LS: R4-1811037 |
TSG WG RAN4 | NR_newRAT-Core |
R5-80 AI: 5.2 |
noted | [WTS] [JSN] | ||
R5-184027 | dummy LS c | LS in | ETSI Secretariat |
R5-80 AI: 3 |
withdrawn | [WTS] [JSN] | |||
R5-184028 | Addition of missing assistance data for modernized GPS and the GPS L5 signal for LTE minimum performance sub-test 4 |
CR revised to R5-185421 |
Spirent Communications | 37.571-5 15.2.0 CR#179 catF | TEI9_Test | Rel-15 |
R5-80 AI: 5.5.11 |
revised | [WTS] [JSN] |
R5-184029 | Addition of missing assistance data for the Galileo E5A signal for LTE minimum performance sub-tests 3 and 8 | CR | Spirent Communications, European Commission | 37.571-5 15.2.0 CR#180 catF | TEI12_Test | Rel-15 |
R5-80 AI: 5.5.11 |
agreed | [WTS] [JSN] |
R5-184030 | Addition of missing assistance data for modernized GPS and the GPS L5 signal for the LTE signalling tests | CR | Spirent Communications | 37.571-5 15.2.0 CR#181 catF | TEI9_Test | Rel-15 |
R5-80 AI: 6.5.7.4 |
agreed | [WTS] [JSN] |
R5-184031 | Addition of missing assistance data for the Galileo E5A signal for LTE signalling tests | CR | Spirent Communications, European Commission | 37.571-5 15.2.0 CR#178 catF | TEI12_Test | Rel-15 |
R5-80 AI: 6.5.7.4 |
withdrawn | [WTS] [JSN] |
R5-184032 | Addition of PICS for support of LPP message segmentation in test 7.3.1.1 | CR | Spirent Communications | 37.571-2 15.2.0 CR#107 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.5.7.1 |
withdrawn | [WTS] [JSN] |
R5-184033 | Addition of PICS for support of LPP message segmentation | CR | Spirent Communications | 37.571-3 15.2.0 CR#95 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.5.7.2 |
withdrawn | [WTS] [JSN] |
R5-184034 | Correction of GNSS information for V2X tests | CR | Spirent Communications, European Commission | 36.521-3 15.2.0 CR#2210 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
withdrawn | [WTS] [JSN] |
R5-184035 | Deletion of Conditions for GNSS Reliability Requirements for V2X from Annex I.6 | CR | Spirent Communications, European Commission | 36.521-3 15.2.0 CR#2211 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
withdrawn | [WTS] [JSN] |
R5-184036 | Addition of missing assistance data for the Galileo E5A signal for LTE signalling tests | CR | Spirent Communications, European Commission | 37.571-5 15.2.0 CR#182 catF | TEI12_Test | Rel-15 |
R5-80 AI: 6.5.7.4 |
agreed | [WTS] [JSN] |
R5-184037 | Addition of PICS for support of LPP message segmentation in test 7.3.1.1 | CR | Spirent Communications | 37.571-2 15.2.0 CR#108 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.5.7.1 |
agreed | [WTS] [JSN] |
R5-184038 | Addition of PICS for support of LPP message segmentation | CR | Spirent Communications | 37.571-3 15.2.0 CR#96 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.5.7.2 |
agreed | [WTS] [JSN] |
R5-184039 | Correction of GNSS information for V2X tests |
CR revised to R5-185536 |
Spirent Communications, European Commission | 36.521-3 15.2.0 CR#2212 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
revised | [WTS] [JSN] |
R5-184040 | Deletion of Conditions for GNSS Reliability Requirements for V2X from Annex I.6 | CR | Spirent Communications, European Commission | 36.521-3 15.2.0 CR#2213 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
agreed | [WTS] [JSN] |
R5-184041 | Clarifications and corrections to Bluetooth identification test | CR | Spirent Communications | 37.571-1 15.2.0 CR#266 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.5.9 |
agreed | [WTS] [JSN] |
R5-184042 | Update RRCConnectionReconfiguration message for EN-DC |
CR revised to R5-185164 |
Ericsson, Qualcomm Inc. | 36.508 15.2.0 CR#1175 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13. |
revised | [WTS] [JSN] |
R5-184043 | Update RRC CONNECTED state | CR | Ericsson | 38.508-1 15.0.0 CR#1 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
withdrawn | [WTS] [JSN] |
R5-184044 | Update EPS Session Management test case in section 10 of TS 36.523-1. |
CR revised to R5-185136 |
FirstNet, AT&T | 36.523-1 15.2.0 CR#4581 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.3.5 |
revised | [WTS] [JSN] |
R5-184045 | Update Reference Table 6.6.2-1A dedicated EPS bearer contexts |
CR revised to R5-185158 |
FirstNet, AT&T | 36.508 15.2.0 CR#1176 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.1 |
revised | [WTS] [JSN] |
R5-184046 | WP – UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) | Work Plan | Ericsson | LTE_UL_CAP_enh-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184047 | SR - UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) | WI status report | Ericsson | LTE_UL_CAP_enh-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184048 | Addition of IR.92 to SM-over-IP roles | CR | ROHDE & SCHWARZ, Ericsson | 34.229-2 14.3.0 CR#246 catF | TEI8_Test | Rel-14 |
R5-80 AI: 6.5.6.2 |
agreed | [WTS] [JSN] |
R5-184049 | WP - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 | Work Plan | Ericsson |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |||
R5-184050 | SR - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 | WI status report | Ericsson | LTE_bands_R15_M2_NB2-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184051 | Discussion paper on the applicability of the tests in 37.571-1 for all types and categories of UE |
discussion revised to R5-185551 |
Spirent Communications, European Commission |
R5-80 AI: 5.5.9 |
revised | [WTS] [JSN] | |||
R5-184052 | Labelling more LTE test cases as not applicable for CAT M1 | CR | ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-2 15.2.0 CR#1184 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.4 |
withdrawn | [WTS] [JSN] |
R5-184053 | Correction to EMM test case 9.2.3.1.25 |
CR revised to R5-185008 |
ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-1 15.2.0 CR#4582 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.4 |
revised | [WTS] [JSN] |
R5-184054 | Add SRB with NR PDCP | CR | Ericsson | 36.508 15.2.0 CR#1177 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13. |
agreed | [WTS] [JSN] |
R5-184055 | Add SRB1 and SRB2 with NR PDCP |
CR revised to R5-185028 |
Ericsson | 38.508-1 15.0.0 CR#2 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184056 | Corrections to G.15.4 | CR | ROHDE & SCHWARZ, Qualcomm Incorporated | 34.229-1 14.3.0 CR#1288 catF | TEI11_Test, MTSI_WLAN-UEConTest | Rel-14 |
R5-80 AI: 6.5.6.1 |
agreed | [WTS] [JSN] |
R5-184057 | Investigation on test coverage for IR.92 and IR.94 | discussion | ROHDE & SCHWARZ |
R5-80 AI: 6.5.6.5 |
noted | [WTS] [JSN] | |||
R5-184058 | Investigation on Supplementary Services | discussion | ROHDE & SCHWARZ |
R5-80 AI: 6.5.6.5 |
noted | [WTS] [JSN] | |||
R5-184059 | Adding SMS over IP configuration to applicabilities |
CR revised to R5-185088 |
ROHDE & SCHWARZ | 34.229-2 14.3.0 CR#247 catF | TEI8_Test | Rel-14 |
R5-80 AI: 6.5.6.2 |
revised | [WTS] [JSN] |
R5-184060 | Adding SMS over SGs configuration to applicabilities | CR | ROHDE & SCHWARZ | 36.523-2 15.2.0 CR#1185 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184061 | Impact of GSMA IR.92 profile extension for EN-DC | discussion | ROHDE & SCHWARZ |
R5-80 AI: 6.3.13.19 |
noted | [WTS] [JSN] | |||
R5-184062 | Resubmission of Corrections to IMS test case 19.1.6 | CR | ETSI MCC (Rohde & Schwarz) | 34.229-1 14.3.0 CR#1289 catF | TEI9_Test | Rel-14 |
R5-80 AI: 6.5.6.1 |
agreed | [WTS] [JSN] |
R5-184063 | Resubmission of Correction to TC 8.1.5.7 | CR | ETSI MCC (MediaTek Inc.) | 34.123-1 15.0.0 CR#3928 catF | TEI_Test | Rel-15 |
R5-80 AI: 6.5.4.1 |
agreed | [WTS] [JSN] |
R5-184064 | Resubmission of a change of Cleaning up TC 6.5.2.4G.1 for V2V | CR | ETSI MCC (Huawei, Hisilicon) | 36.521-1 15.2.0 CR#4335 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
withdrawn | [WTS] [JSN] |
R5-184065 | Resubmission of Introduction of Maximum Power Reduction (MPR) for CA (3UL CA) | CR | ETSI MCC (SGS Wireless) | 36.521-1 15.2.0 CR#4336 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
withdrawn | [WTS] [JSN] |
R5-184066 | Resubmission of the Annexes of TC 6.5.2.3G.1 for V2V | CR | ETSI MCC (Huawei, Hisilicon) | 36.521-1 15.2.0 CR#4337 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-184067 | Correction to 10.7.4 regarding CE mode |
CR revised to R5-185135 |
ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#4583 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.5 |
revised | [WTS] [JSN] |
R5-184068 | FR1 TT Way Forward update |
discussion revised to R5-185564 |
Telecom Italia S.p.A. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184069 | Correction of the Update to applicability condition of test case 11.2.3 to include CSG PICS | CR | ETSI MCC (Qualcomm Incorporated) | 36.523-2 15.2.0 CR#1186 catF | TEI9_Test | Rel-15 |
R5-80 AI: 6.4.4 |
withdrawn | [WTS] [JSN] |
R5-184070 | MCC TF160 Status Report |
report revised to R5-184999 |
MCC TF160 |
R5-80 AI: 2.1 |
revised | [WTS] [JSN] | |||
R5-184071 | V2X: Test Model updates | CR | MCC TF160 | 36.523-3 15.0.0 CR#4252 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.5 |
agreed | [WTS] [JSN] |
R5-184072 | EN-DC: TS 38.508-1 / 36.508 issue list | discussion | MCC TF160 |
R5-80 AI: 6.3.13.19 |
noted | [WTS] [JSN] | |||
R5-184073 | EN-DC: Test Model updates |
CR revised to R5-185156 |
MCC TF160 | 38.523-3 15.0.0 CR#1 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.6 |
revised | [WTS] [JSN] |
R5-184074 | eLAA: Test Model | CR | MCC TF160 | 36.523-3 15.0.0 CR#4253 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 6.3.7.4 |
agreed | [WTS] [JSN] |
R5-184075 | NB-IoT timer tolerances: extension of timer value range | CR | MCC TF160, Anritsu Ltd. | 36.508 15.2.0 CR#1178 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.1 |
agreed | [WTS] [JSN] |
R5-184076 | Corrections to UE Test Loop Mode H |
CR revised to R5-185125 |
MCC TF160 | 36.509 13.6.0 CR#193 catF | TEI13_Test, NB_IOT-UEConTest | Rel-13 |
R5-80 AI: 6.4.2 |
revised | [WTS] [JSN] |
R5-184077 | Corrections to UE Test Loop Mode H | CR | MCC TF160 | 36.509 14.4.0 CR#194 catA | TEI13_Test, NB_IOT-UEConTest | Rel-14 |
R5-80 AI: 6.4.2 |
agreed | [WTS] [JSN] |
R5-184078 | Corrections to UE Test Loop Mode H | CR | MCC TF160 | 36.509 15.0.0 CR#195 catA | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.2 |
agreed | [WTS] [JSN] |
R5-184079 | Clarification for NB-IoT test case 22.3.1.1 |
CR revised to R5-185012 |
MCC TF160, Rohde&Schwarz | 36.523-1 15.2.0 CR#4584 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
revised | [WTS] [JSN] |
R5-184080 | Routine maintenance for TS 36.523-3 |
CR revised to R5-185139 |
MCC TF160 | 36.523-3 15.0.0 CR#4254 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.5 |
revised | [WTS] [JSN] |
R5-184081 | MCPTT: Test Model updates | CR | MCC TF160 | 36.579-5 13.0.0 CR#1 catF | TEI13_Test, MCPTT-ConTest | Rel-13 |
R5-80 AI: 6.5.9.5 |
agreed | [WTS] [JSN] |
R5-184082 | Editorial clean up for consistency and better clarity | CR | Spirent Communications, European Commission | 37.571-5 15.2.0 CR#183 catF | TEI15_Test | Rel-15 |
R5-80 AI: 5.5.11 |
withdrawn | [WTS] [JSN] |
R5-184083 | Applicability of tests for types and Categories of UE |
CR revised to R5-185552 |
Spirent Communications, European Commission | 37.571-1 15.2.0 CR#267 catF | TEI12_Test | Rel-15 |
R5-80 AI: 5.5.9 |
revised | [WTS] [JSN] |
R5-184084 | Update serving cell |
CR revised to R5-185029 |
Ericsson | 38.508-1 15.0.0 CR#3 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184085 | TP to TS38.521-1:Operating bands and channel arrangement |
pCR revised to R5-185321 |
China Unicom | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184086 | Applicability and ICS for CA RF and RRM test cases | CR | Ericsson | 36.521-2 15.2.0 CR#735 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.3 |
withdrawn | [WTS] [JSN] |
R5-184087 | Update chapter 3 | CR | Ericsson | 38.508-1 15.0.0 CR#4 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-184088 | Correction to Rel-99 NAS testcase 9.4.9 | CR | ROHDE & SCHWARZ | 34.123-1 15.0.0 CR#3929 catF | TEI_Test | Rel-15 |
R5-80 AI: 6.5.4.1 |
agreed | [WTS] [JSN] |
R5-184089 | Correction to NB-IoT test case 22.5.8 |
CR revised to R5-185013 |
ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#4585 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
revised | [WTS] [JSN] |
R5-184090 | Correction to NB-IoT test case 22.5.14 |
CR revised to R5-185014 |
ROHDE & SCHWARZ, Qualcomm | 36.523-1 15.2.0 CR#4586 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
revised | [WTS] [JSN] |
R5-184091 | Correction to NB-IoT test case 22.6.2 | CR | ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#4587 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-184092 | Correction to NB-IoT test case 22.6.3 | CR | ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#4588 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-184093 | Correction to NB-IoT test case 22.1.1 | CR | ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#4589 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-184094 | Correction to ATTACH ACCEPT message for SMS only |
CR revised to R5-185002 |
ROHDE & SCHWARZ | 36.508 15.2.0 CR#1179 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.1 |
revised | [WTS] [JSN] |
R5-184095 | Correction to eNB-IoT test case 22.3.2.7 |
CR revised to R5-185114 |
MCC TF160 | 36.523-1 15.2.0 CR#4590 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-184096 | Editorial corrections to IMS emergency call test cases in clauses 19 and 21 | CR | MCC TF160 | 34.229-1 14.3.0 CR#1290 catF | TEI9_Test | Rel-14 |
R5-80 AI: 6.5.6.1 |
agreed | [WTS] [JSN] |
R5-184097 | Introduce SA RRC messages |
CR revised to R5-185030 |
Ericsson | 38.508-1 15.0.0 CR#5 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184098 | Update Clause in 6.2.5EA Configured UE transmitted Power for UE category M1 |
CR revised to R5-185522 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#4338 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2 |
revised | [WTS] [JSN] |
R5-184099 | Introduction of band 73 to UE maximum output power in TS36.521-1 | CR | China Unicom | 36.521-1 15.2.0 CR#4339 catF | LTE450_Reg3-UEConTest | Rel-15 |
R5-80 AI: 5.3.22.3 |
agreed | [WTS] [JSN] |
R5-184100 | Applicability correction for event triggered eMTC tests | CR | ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2214 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.4 |
withdrawn | [WTS] [JSN] |
R5-184101 | Applicability correction for HO eMTC tests | CR | ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2215 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.4 |
withdrawn | [WTS] [JSN] |
R5-184102 | Editorial corrections 8.16.73 | CR | ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2216 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-184103 | Editorial corrections 9.1.46 |
CR revised to R5-185483 |
ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2217 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
revised | [WTS] [JSN] |
R5-184104 | Editorial corrections 9.1.50 |
CR revised to R5-185484 |
ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2218 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
revised | [WTS] [JSN] |
R5-184105 | Editorial corrections 7.3.49 | CR | ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2219 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184106 | RMC correction 8.1.12_1 (core spec alignment) | CR | ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2220 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184107 | New generic CA RSRP test cases | CR | ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2221 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-184108 | New generic CA RSRQ test cases | CR | ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2222 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-184109 | Applicability correction for eMTC tests | CR | ROHDE & SCHWARZ | 36.521-2 15.2.0 CR#736 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.3 |
withdrawn | [WTS] [JSN] |
R5-184110 | Correction to NB-IOT In-Band Test Frequencies | CR | ROHDE & SCHWARZ | 36.508 15.2.0 CR#1180 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.1 |
agreed | [WTS] [JSN] |
R5-184111 | Addition of NB-IOT Guardband Test Frequencies for 10 MHz |
CR revised to R5-185409 |
ROHDE & SCHWARZ | 36.508 15.2.0 CR#1181 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.1 |
revised | [WTS] [JSN] |
R5-184112 | Correction to nrs-CRS-PowerOffset-r13 for NB-IOT OTDOA tests |
CR revised to R5-185416 |
ROHDE & SCHWARZ | 37.571-1 15.2.0 CR#268 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.6 |
revised | [WTS] [JSN] |
R5-184113 | NB-IOT OTDOA reporting delay test cases not testable |
CR revised to R5-185417 |
ROHDE & SCHWARZ | 37.571-1 15.2.0 CR#269 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.6 |
revised | [WTS] [JSN] |
R5-184114 | Changes to eMTC OTDOA tests |
CR revised to R5-185419 |
ROHDE & SCHWARZ | 37.571-1 15.2.0 CR#270 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.5 |
revised | [WTS] [JSN] |
R5-184115 | Draft TS 38.533 v0.0.2 | draft TS | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |
R5-184116 | LS on generic 3CC to 5CC RRM test cases |
LS out LS To: GCF SG, PTCRB PVG |
ROHDE & SCHWARZ | LTE_CA_Rel13-UEConTest |
R5-80 AI: 5.6 |
approved | [WTS] [JSN] | ||
R5-184117 | New CA band combination CA_1A-3A-7A-20A - Update of table 7.3A.5, 7.3A.9 and refsens |
CR revised to R5-185343 |
Vodafone GmbH | 36.521-1 15.2.0 CR#4340 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
revised | [WTS] [JSN] |
R5-184118 | New CA band combination CA_1A-3A-7A-20A - Update of table A.4.6.3-5 |
CR revised to R5-185344 |
Vodafone GmbH | 36.521-2 15.2.0 CR#737 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.3 |
revised | [WTS] [JSN] |
R5-184119 | New CA band combination CA_1A-3A-7A-20A - Update of table A.4.3.3.3-5 |
CR revised to R5-185140 |
Vodafone GmbH | 36.523-2 15.2.0 CR#1187 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 6.3.4.3 |
revised | [WTS] [JSN] |
R5-184120 | New CA band combination CA_1A-3A-7A-20A - Update of test point analysis |
CR revised to R5-185345 |
Vodafone GmbH | 36.905 15.1.0 CR#141 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4. |
revised | [WTS] [JSN] |
R5-184121 | TP for Clause 4.1.1 of TS 38.522 |
pCR revised to R5-185209 |
CMCC | 38.522 0.3.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.8 |
revised | [WTS] [JSN] |
R5-184122 | TP for Clause 4.1.2 of TS 38.522 |
pCR revised to R5-185210 |
CMCC | 38.522 0.3.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.8 |
revised | [WTS] [JSN] |
R5-184123 | TP for Clause 4.1.3 of TS 38.522 |
pCR revised to R5-185211 |
CMCC | 38.522 0.3.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.8 |
revised | [WTS] [JSN] |
R5-184124 | Discussion on the way to write Clause 7.4 Maximum Input Level and Clause 7.5 Adjacent Channel Selectivity in TS 38.521-3 |
discussion revised to R5-185328 |
CMCC, HUAWEI | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184125 | Add Clause 7.5 into TS 38.521-3 |
pCR revised to R5-185329 |
CMCC | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184126 | Correct IE FrequencyInfoDL |
CR revised to R5-185031 |
Ericsson | 38.508-1 15.0.0 CR#6 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184127 | Introduce SA system information blocks |
CR revised to R5-185032 |
Ericsson | 38.508-1 15.0.0 CR#7 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184128 | Discussion on Test Loop Mode H | discussion | MCC TF160 |
R5-80 AI: 6.4.6 |
noted | [WTS] [JSN] | |||
R5-184129 | Editorial Correction to note 7 in Table E-1 | CR | ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#2223 catF | TEI12_Test | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184130 | Introduction of band 73 to Spurious emission in TS36.521-1 | CR | China Unicom | 36.521-1 15.2.0 CR#4341 catF | LTE450_Reg3-UEConTest | Rel-15 |
R5-80 AI: 5.3.22.3 |
agreed | [WTS] [JSN] |
R5-184131 | Addition of Assistance Data for OTDOA eMTC tests |
CR revised to R5-185420 |
ROHDE & SCHWARZ | 37.571-5 15.2.0 CR#184 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.7 |
revised | [WTS] [JSN] |
R5-184132 | Correction of the applicability for OTDOA IOT tests |
CR revised to R5-185418 |
ROHDE & SCHWARZ | 37.571-3 15.2.0 CR#97 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.7 |
revised | [WTS] [JSN] |
R5-184133 | Discussion on RRM 5G progress | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184134 | Introduce SA other information elements |
CR revised to R5-185033 |
Ericsson | 38.508-1 15.0.0 CR#8 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184135 | eNB-IoT: Test Model | CR | MCC TF160 | 36.523-3 15.0.0 CR#4259 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.5 |
agreed | [WTS] [JSN] |
R5-184136 | Removal of technical content in 34.108 v14.2.0 and substitution with pointer to the next Release | CR | ETSI Secretariat | 34.108 14.2.0 CR#1001 catF | TEI14_Test | Rel-14 |
R5-80 AI: 7.1 |
agreed | [WTS] [JSN] |
R5-184137 | Removal of technical content in 34.121-2 v14.1.0 and substitution with pointer to the next Release | CR | ETSI Secretariat | 34.121-2 14.1.0 CR#177 catF | TEI14_Test | Rel-14 |
R5-80 AI: 7.1 |
agreed | [WTS] [JSN] |
R5-184138 | Removal of technical content in 34.123-1 v14.5.0 and substitution with pointer to the next Release | CR | ETSI Secretariat | 34.123-1 14.5.0 CR#3930 catF | TEI14_Test | Rel-14 |
R5-80 AI: 7.1 |
agreed | [WTS] [JSN] |
R5-184139 | Removal of technical content in 34.123-2 v14.4.0 and substitution with pointer to the next Release | CR | ETSI Secretariat | 34.123-2 14.4.0 CR#790 catF | TEI14_Test | Rel-14 |
R5-80 AI: 7.1 |
agreed | [WTS] [JSN] |
R5-184140 | Removal of technical content in 36.521-3 v14.4.0 and substitution with pointer to the next Release | CR | ETSI Secretariat | 36.521-3 14.4.0 CR#2224 catF | TEI14_Test | Rel-14 |
R5-80 AI: 7.1 |
agreed | [WTS] [JSN] |
R5-184141 | Removal of technical content in 36.523-3 v14.4.0 and substitution with pointer to the next Release | CR | ETSI Secretariat | 36.523-3 14.4.0 CR#4260 catF | TEI14_Test | Rel-14 |
R5-80 AI: 7.1 |
agreed | [WTS] [JSN] |
R5-184142 | Removal of technical content in 36.903 v13.5.0 and substitution with pointer to the next Release | CR | ETSI Secretariat | 36.903 13.5.0 CR#382 catF | TEI13_Test | Rel-13 |
R5-80 AI: 7.1 |
agreed | [WTS] [JSN] |
R5-184143 | Removal of technical content in 36.905 v14.6.0 and substitution with pointer to the next Release | CR | ETSI Secretariat | 36.905 14.6.0 CR#142 catF | TEI14_Test | Rel-14 |
R5-80 AI: 7.1 |
agreed | [WTS] [JSN] |
R5-184144 | Correction to test case 9.5.7.2 | CR | Intel Corporation (UK) Ltd, Rohde & Schwarz | 34.123-1 15.0.0 CR#3931 catF | TEI_Test | Rel-15 |
R5-80 AI: 6.5.4.1 |
agreed | [WTS] [JSN] |
R5-184145 | Addition of Test Case:” LWA / T351 Expiry” to WLAN/3GPP Radio Level Integration and Interworking Enhancement Interworking Work Item |
CR revised to R5-185105 |
Intel Corporation (UK) Ltd | 36.523-1 15.2.0 CR#4591 catF | LTE_WLAN_radio-UEConTest | Rel-15 |
R5-80 AI: 6.3.3.2 |
revised | [WTS] [JSN] |
R5-184146 | Addition of Applicability statement for WLAN/3GPP Radio Level Integration and Interworking Enhancement test case: ”LWA / T351 Expiry” | CR | Intel Corporation (UK) Ltd | 36.523-2 15.2.0 CR#1188 catF | LTE_WLAN_radio-UEConTest | Rel-15 |
R5-80 AI: 6.3.3.3 |
agreed | [WTS] [JSN] |
R5-184147 | Test Tolerance Analysis for RRM TC 9.1.1.1_2 and 9.1.2.1_2 |
CR revised to R5-185395 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#383 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184148 | Addition of TT analysis of eHST FDD Intra-frequency event reporting. |
CR revised to R5-185424 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#384 catF | LTE_high_speed-UEConTest | Rel-14 |
R5-80 AI: 5.3.9.5 |
revised | [WTS] [JSN] |
R5-184149 | Addition of TT analysis of V2X uplink timing test case |
CR revised to R5-185425 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#385 catF | LTE_V2X-UEConTest | Rel-14 |
R5-80 AI: 5.3.12.6 |
revised | [WTS] [JSN] |
R5-184150 | Test tolerance update of V2X uplink timing test cases |
CR revised to R5-185554 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#2225 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
revised | [WTS] [JSN] |
R5-184151 | Test tolerance update of eHST FDD event reporting test case | CR | Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#2226 catF | LTE_high_speed-UEConTest | Rel-15 |
R5-80 AI: 5.3.9.4 |
agreed | [WTS] [JSN] |
R5-184152 | TP to TS8.521-1: Operating bands and Channel arrangement | pCR | China Unicom | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184153 | Draft TS 38.521-1 v1.0.1 | draft TS | China Unicom | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
withdrawn | [WTS] [JSN] | |
R5-184154 | Draft TS 38.521-1 v1.0.1 | draft TS | China Unicom | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |
R5-184155 | Test Tolerance Analysis for RRM TC 9.1.1.2_2 and 9.1.2.2_2 |
CR revised to R5-185396 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#386 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184156 | Test Tolerance Analysis for RRM TC 9.1.3.1_2 and 9.1.4.1_2 |
CR revised to R5-185397 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#387 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184157 | Test Tolerance Analysis for RRM TC 9.1.3.2_2 and 9.1.4.2_2 |
CR revised to R5-185398 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#388 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184158 | Test Tolerance Analysis for RRM TC 9.1.5.1_2 |
CR revised to R5-185399 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#389 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184159 | Test Tolerance Analysis for RRM TC 9.1.5.2_2 |
CR revised to R5-185400 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#390 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184160 | Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 | CR | Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#391 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.8 |
withdrawn | [WTS] [JSN] |
R5-184161 | Test Tolerance Analysis for RRM TC 9.2.3.1_2 and 9.2.4.1_2 |
CR revised to R5-185401 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#392 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184162 | Test Tolerance Analysis for RRM TC 9.2.3.2_2 and 9.2.4.2_2 |
CR revised to R5-185402 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#393 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184163 | Test Tolerance Analysis for RRM TC 9.2.4A.1_2 |
CR revised to R5-185403 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#394 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184164 | Test Tolerance Analysis for RRM TC 9.2.4A.2_2 |
CR revised to R5-185404 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#395 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184165 | Test Tolerance: Updates to Cat1bis inter frequency RSRP accuracy tests and Annex F |
CR revised to R5-185391 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#2227 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
revised | [WTS] [JSN] |
R5-184166 | Test Tolerance: Updates to Cat1bis inter frequency RSRQ accuracy tests and Annex F |
CR revised to R5-185392 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#2228 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
revised | [WTS] [JSN] |
R5-184167 | Test Tolerance: Updates to Cat1bis intra frequency RSRP accuracy tests and Annex F |
CR revised to R5-185393 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#2229 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
revised | [WTS] [JSN] |
R5-184168 | Test Tolerance: Updates to Cat1bis intra frequency RSRQ accuracy tests and Annex F |
CR revised to R5-185394 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#2230 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
revised | [WTS] [JSN] |
R5-184169 | Update of RRM IncMon test cases 8.3.7, 8.3.8, 8.3.9, 8.4.7 including test tolerances |
CR revised to R5-185485 |
Ericsson | 36.521-3 15.2.1 CR#2231 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184170 | Requirements for test frequencies for 5G signalling test cases | discussion | MCC TF160 |
R5-80 AI: 6.3.13.19 |
noted | [WTS] [JSN] | |||
R5-184171 | TC Group definition for RRM IncMon test cases |
CR revised to R5-185456 |
Ericsson | 36.903 14.1.0 CR#396 catF | LTE_UTRA_IncMon-UEConTest | Rel-14 |
R5-80 AI: 5.3.1.7 |
revised | [WTS] [JSN] |
R5-184172 | Add Test Tolerances analysis for E-UTRAN RRM IncMon TCs 8.3.7 and 8.4.7 | CR | Ericsson | 36.903 14.1.0 CR#397 catF | LTE_UTRA_IncMon-UEConTest | Rel-14 |
R5-80 AI: 5.3.1.7 |
agreed | [WTS] [JSN] |
R5-184173 | Add Test Tolerances analysis for E-UTRAN IncMon TC 8.3.8 | CR | Ericsson | 36.903 14.1.0 CR#398 catF | LTE_UTRA_IncMon-UEConTest | Rel-14 |
R5-80 AI: 5.3.1.7 |
agreed | [WTS] [JSN] |
R5-184174 | Add Test Tolerances analysis for E-UTRAN IncMon TC 8.3.9 | CR | Ericsson | 36.903 14.1.0 CR#399 catF | LTE_UTRA_IncMon-UEConTest | Rel-14 |
R5-80 AI: 5.3.1.7 |
agreed | [WTS] [JSN] |
R5-184175 | Correction to NR MAC test case 7.1.1.3.2 |
CR revised to R5-185059 |
Keysight Technologies UK Ltd | 38.523-1 15.0.0 CR#1 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184176 | Updates to PDCCH and SearchSpace configurations |
CR revised to R5-185034 |
MCC TF160 | 38.508-1 15.0.0 CR#9 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184177 | Updation of V2X TC 6.6.2.1G.2 & 6.6.2.1G.3 | CR | Huawei, Hisilicon | 36.521-1 15.2.0 CR#4342 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-184178 | Introcution of V2X TC 6.5.2.4G.3 |
CR revised to R5-185438 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#4343 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184179 | Updation of V2X TC 6.6.2.2G.2 |
CR revised to R5-185439 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#4344 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184180 | Updation of V2X TCs 6.5.2.3G.2 and 6.5.2.3G.3 |
CR revised to R5-185440 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#4345 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184181 | Update of V2V TCs 6.5.2.3G.1 & 6.5.2.4G & 6.6.2.2G.1& 6.6.3G.1 |
CR revised to R5-185354 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#4346 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
revised | [WTS] [JSN] |
R5-184182 | TT statements for V2X TCs |
CR revised to R5-185441 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#4347 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184183 | Update of V2X TCs 6.6.3G.2_1 & 6.6.3G.3_1 |
CR revised to R5-185360 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#4348 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184184 | Update of V2X TCs 6.6.3G.2 & 6.6.3G.3 |
CR revised to R5-185361 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#4349 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184185 | Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 |
CR revised to R5-185405 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#400 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184186 | Proposal for Signalling Test Setup in FR2 | CR | ANRITSU LTD | 38.508-1 15.0.0 CR#10 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
withdrawn | [WTS] [JSN] |
R5-184187 | Correction to testcase 9.2.2.1.9 for CAT-M1 UEs | CR | ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-3 15.0.0 CR#4262 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.4 |
withdrawn | [WTS] [JSN] |
R5-184188 | Reuse of demodulation setup for signalling tests in FR2 |
discussion revised to R5-185131 |
ANRITSU LTD | 5GS_NR_LTE-UEConTest |
R5-80 AI: 4.5.2 |
revised | [WTS] [JSN] | ||
R5-184189 | Band groups added to specification | CR | PCTEST Engineering Laboratory, Inc. | 37.571-1 15.2.0 CR#271 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.5.9 |
agreed | [WTS] [JSN] |
R5-184190 | Editorial - Updates for GNSS Signal Capabilities | CR | PCTEST Engineering Laboratory, Inc. | 37.571-3 15.2.0 CR#98 catF | TEI15_Test | Rel-15 |
R5-80 AI: 5.5. |
agreed | [WTS] [JSN] |
R5-184191 | Editorial - Updates, corrections and clarifications to specification | CR | PCTEST Engineering Laboratory, Inc. | 37.571-5 15.2.0 CR#185 catF | TEI15_Test | Rel-15 |
R5-80 AI: 5.5.11 |
agreed | [WTS] [JSN] |
R5-184192 | Correction of Test Cases 8.2.5.4 and 8.2.5.5 |
CR revised to R5-185106 |
Intel Corporation (UK) Ltd | 36.523-1 15.2.0 CR#4592 catF | LTE_WLAN_radio-UEConTest | Rel-15 |
R5-80 AI: 6.3.3.2 |
revised | [WTS] [JSN] |
R5-184193 | Correction to 36521-1-chapter 6_V2V and V2X |
CR revised to R5-185362 |
Tejet | 36.521-1 15.2.0 CR#4350 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184194 | eLAA_correction to 6.3.5A.1.2 and 6.3.5A.2.2 |
CR revised to R5-185431 |
Tejet | 36.521-1 15.2.0 CR#4351 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 5.3.7.2 |
revised | [WTS] [JSN] |
R5-184195 | eLAA_Update to 6.6.2.3A.2 | CR | Tejet | 36.521-1 15.2.0 CR#4352 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 5.3.7.2 |
withdrawn | [WTS] [JSN] |
R5-184196 | eLAA_Update to 6.6.3.1A.2 |
CR revised to R5-185432 |
Tejet | 36.521-1 15.2.0 CR#4353 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 5.3.7.2 |
revised | [WTS] [JSN] |
R5-184197 | CA band combination CA_2A-46A CA_26A-46A - Updates of test points analysis | CR | Tejet | 36.905 15.1.0 CR#143 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 5.3.7.5 |
agreed | [WTS] [JSN] |
R5-184198 | WP - UE Conformance Test Aspects - Voice and Video Enhancement for LTE | Work Plan | CATT | LTE_VoLTE_ViLTE_enh-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184199 | SR - UE Conformance Test Aspects - Voice and Video Enhancement for LTE | WI status report | CATT | LTE_VoLTE_ViLTE_enh-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184200 | WP - UE Conformance Test Aspects - UL Data Compression in LTE | Work Plan | CATT | LTE_UDC-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184201 | SR - UE Conformance Test Aspects - UL Data Compression in LTE | WI status report | CATT | LTE_UDC-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184202 | Completion of Chapter 7 RRM cat 1bis test cases |
CR revised to R5-185386 |
Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2232 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
revised | [WTS] [JSN] |
R5-184203 | Test Tolerance: Updates to Cat1bis chapter 8 inter-frequency event triggered reporting tests | CR | Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2233 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184204 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis | CR | Qualcomm UK Ltd | 36.903 14.1.0 CR#401 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.8 |
withdrawn | [WTS] [JSN] |
R5-184205 | Test Tolerance: Updates to Cat1bis Event triggered reporting tests under AWGN propagation conditions in asynchronous cells with DRX when L3 filtering is used | CR | Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2234 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184206 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used | CR | Qualcomm UK Ltd | 36.903 14.1.0 CR#402 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.8 |
withdrawn | [WTS] [JSN] |
R5-184207 | Test Tolerance: Updates to Cat1bis Event triggered reporting tests with fading, Annex E and Annex F | CR | Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2235 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184208 | Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis | CR | Qualcomm UK Ltd | 36.903 14.1.0 CR#403 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.8 |
withdrawn | [WTS] [JSN] |
R5-184209 | Test Tolerance: Updates to Cat1bis intra-frequency Event triggered reporting tests, Annex E and Annex F | CR | Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2236 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184210 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis | CR | Qualcomm UK Ltd | 36.903 14.1.0 CR#404 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.8 |
withdrawn | [WTS] [JSN] |
R5-184211 | Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F |
CR revised to R5-185337 |
Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2237 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
revised | [WTS] [JSN] |
R5-184212 | Test Tolerances analysis for E-UTRAN FDD and TDD Intra-frequency CGI TC 8.1.19_2, 8.1.20_2, 8.2.7_2, 8.2.8_2 for UE category 1bis | CR | Qualcomm UK Ltd | 36.903 14.1.0 CR#405 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.8 |
withdrawn | [WTS] [JSN] |
R5-184213 | Removal of Testcase 8.2.2.6.4 | CR | CATT | 36.523-1 15.2.0 CR#4593 catF | LTE_VoLTE_ViLTE_enh-UEConTest | Rel-15 |
R5-80 AI: 6.3.14.5 |
agreed | [WTS] [JSN] |
R5-184214 | Removal of Testcase 8.2.2.6.5 | CR | CATT | 36.523-1 15.2.0 CR#4594 catF | LTE_VoLTE_ViLTE_enh-UEConTest | Rel-15 |
R5-80 AI: 6.3.14.5 |
agreed | [WTS] [JSN] |
R5-184215 | Update of the title of Testcase 7.1.5.6 | CR | CATT | 36.523-1 15.2.0 CR#4595 catF | LTE_VoLTE_ViLTE_enh-UEConTest | Rel-15 |
R5-80 AI: 6.3.14.5 |
withdrawn | [WTS] [JSN] |
R5-184216 | Corrections to NBIOT NAS TC 22.5.7b |
CR revised to R5-185015 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#4640 catF | NB_IOT-UEConTest, TEI13_Test | Rel-15 |
R5-80 AI: 6.4.3.11 |
revised | [WTS] [JSN] |
R5-184217 | Update of applicability and tests conditions for LTE_VoLTE_ViLTE_enh test cases | CR | CATT | 36.523-2 15.2.0 CR#1189 catF | LTE_VoLTE_ViLTE_enh-UEConTest | Rel-15 |
R5-80 AI: 6.3.14.6 |
agreed | [WTS] [JSN] |
R5-184218 | Addition of Correct HARQ process handling BCCH test case 7.1.1.2.4 | CR | Huawei, Hisilicon | 38.523-1 15.0.0 CR#2 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184219 | Addition of Correct HARQ process handling CCCH test case 7.1.1.2.3 | CR | Huawei, Hisilicon | 38.523-1 15.0.0 CR#3 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184220 | Addition of Correct Handling of DL HARQ process PDSCH Aggregation test case 7.1.1.2.2 |
CR revised to R5-185060 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#4 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184221 | Addition of NR CA reconfiguration test case 8.2.4.2.1.1 |
CR revised to R5-185061 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#5 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184222 | Addition of NR CA reconfiguration test case 8.2.4.2.1.2 |
CR revised to R5-185062 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#6 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184223 | Addition of NR CA reconfiguration test case 8.2.4.2.1.3 |
CR revised to R5-185148 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#7 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184224 | Addition of Random access procedure Successful Supplementary Uplink test case 7.1.1.1.5 | CR | Huawei, Hisilicon | 38.523-1 15.0.0 CR#8 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184225 | Addition of Random access test case 7.1.1.1.4 |
CR revised to R5-185063 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#9 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184226 | Addition of Correct handling of Configured UL grant Type 1 test case 7.1.1.6.2 | CR | Huawei, Hisilicon | 38.523-1 15.0.0 CR#10 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184227 | Addition of Correct handling of Configured UL grant Type 2 test case 7.1.1.6.3 | CR | Huawei, Hisilicon | 38.523-1 15.0.0 CR#11 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184228 | CR of Correct handling of DL assignment Semi persistent test case 7.1.1.6.1 | CR | Huawei, Hisilicon | 38.523-1 15.0.0 CR#12 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184229 | CR of UE power headroom reporting test case 7.1.1.3.7 | CR | Huawei, Hisilicon | 38.523-1 15.0.0 CR#13 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184230 | CR of BSR report test case 7.1.1.3.4 | CR | Huawei, Hisilicon | 38.523-1 15.0.0 CR#14 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184231 | Addition and correction of test applicability of multiple signalling test cases | CR | Huawei, Hisilicon | 38.523-2 15.0.0 CR#1 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.5 |
withdrawn | [WTS] [JSN] |
R5-184232 | Discussion on CQI reporting on highest MCS value case | discussion | Huawei, Hisilicon | TEI8_Test | Rel-15 |
R5-80 AI: 5.4.1.11 |
noted | [WTS] [JSN] | |
R5-184233 | CR of CQI reporting test case 9.2.1.1.4.2 |
CR revised to R5-185537 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#4354 catF | TEI8_Test | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
revised | [WTS] [JSN] |
R5-184234 | Correction to message contents for UL64QAM | CR | Anritsu | 36.508 15.2.0 CR#1182 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.1 |
agreed | [WTS] [JSN] |
R5-184235 | Correction to default message for UL CA tests | CR | Anritsu | 36.508 15.2.0 CR#1183 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.1 |
agreed | [WTS] [JSN] |
R5-184236 | Editorial correction to FDD Mode test frequencies | CR | Anritsu | 36.508 15.2.0 CR#1184 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.1 |
agreed | [WTS] [JSN] |
R5-184237 | Correction to Figure A.64 to cater for CC >= 3 |
CR revised to R5-185449 |
Anritsu | 36.508 15.2.0 CR#1185 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.1 |
revised | [WTS] [JSN] |
R5-184238 | Correction to LAA CQI reporting tests | CR | Anritsu | 36.521-1 15.2.0 CR#4355 catF | TEI13_Test, LTE_LAA-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
agreed | [WTS] [JSN] |
R5-184239 | Correction to 4x4 CA demodulation tests |
CR revised to R5-185375 |
Anritsu | 36.521-1 15.2.0 CR#4356 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.2 |
revised | [WTS] [JSN] |
R5-184240 | Correction to cqi-pmi-ConfigurationIndex for 5DL CA CQI Reporting tests | CR | Anritsu | 36.521-1 15.2.0 CR#4357 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184241 | Correction to message exception for 8.2.1.4.2_A.4 |
CR revised to R5-185450 |
Anritsu | 36.521-1 15.2.0 CR#4358 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184242 | Correction to p-Max in configured UE transmitted output power tests for CA | CR | Anritsu | 36.521-1 15.2.0 CR#4359 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184243 | Removal of the editor’s note regarding the faders in 4x4 CA demod tests | CR | Anritsu | 36.521-1 15.2.0 CR#4360 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.2 |
agreed | [WTS] [JSN] |
R5-184244 | Editorial correction to inter-band UL CA tests | CR | Anritsu | 36.521-1 15.2.0 CR#4361 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184245 | Editorial correction to RMC name in PHICH demodulation test |
CR revised to R5-185451 |
Anritsu | 36.521-1 15.2.0 CR#4362 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
revised | [WTS] [JSN] |
R5-184246 | Editorial correction to test points for 8.7.5.1 | CR | Anritsu | 36.521-1 15.2.0 CR#4363 catF | TEI12_Test | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
agreed | [WTS] [JSN] |
R5-184247 | Correction to 4CA and 5CA PDSCH demodulation tests | CR | Anritsu | 36.521-1 15.2.0 CR#4364 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184248 | Corrections to CA Test Configuration Table in section 7 |
CR revised to R5-185452 |
Anritsu | 36.521-1 15.2.0 CR#4365 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184249 | Editorial correction to Table 6.2.5.3-3 Delta TIB (three bands) | CR | Anritsu | 36.521-1 15.2.0 CR#4366 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
R5-184250 | Correction to Test Tolerance for 4DL and 5DL Reference Sensitivity Test | CR | Anritsu | 36.521-1 15.2.0 CR#4367 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184251 | Editorial correction to 6.6.3.3 | CR | Anritsu | 36.521-1 15.2.0 CR#4368 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
withdrawn | [WTS] [JSN] |
R5-184252 | Correction of connection diagram for 4Rx 3CC/4CC/5CC Rx tests | CR | Anritsu | 36.521-1 15.2.0 CR#4369 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184253 | Clarify the definition of active time slot in out of band and spurious emission tests | CR | Anritsu | 36.521-1 15.2.0 CR#4370 catF | TEI8_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184254 | Editorial correction to test points for CA_2A-12A-66A in 7.3A.5 | CR | Anritsu | 36.521-1 15.2.0 CR#4371 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184255 | Editorial correction to Reference NPRACH Configuration | CR | Anritsu | 36.521-3 15.2.1 CR#2238 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184256 | Correction to 5CA FDD-TDD Chapter 8 Tests | CR | Anritsu | 36.521-3 15.2.1 CR#2239 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-184257 | Correction to LAA CSI-RS measurement test | CR | Anritsu | 36.521-3 15.2.1 CR#2240 catF | TEI13_Test, LTE_LAA-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.4 |
withdrawn | [WTS] [JSN] |
R5-184258 | Editorial correction to LAA Listen-before-talk model | CR | Anritsu | 36.521-3 15.2.1 CR#2241 catF | TEI13_Test, LTE_LAA-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184259 | Correction to connection figure for 4 DL and 5 DL CA Event Triggered Reporting tests | CR | Anritsu | 36.521-3 15.2.1 CR#2242 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-184260 | Correction to cell configuration mapping table for 8.16.70 and 8.16.78 | CR | Anritsu | 36.521-3 15.2.1 CR#2243 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-184261 | Correction to cell configuration mapping for 8.26.3 | CR | Anritsu | 36.521-3 15.2.1 CR#2244 catF | TEI13_Test, LTE_LAA-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184262 | Correction to test procedure for FS3 event triggered reporting tests | CR | Anritsu | 36.521-3 15.2.1 CR#2245 catF | TEI13_Test, LTE_LAA-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184263 | Correction to test requirement of FS3 event triggered reporting tests | CR | Anritsu | 36.521-3 15.2.1 CR#2246 catF | TEI13_Test, LTE_LAA-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184264 | Correction to minimum conformance requirements for FDD_B1 and FDD_B2 | CR | Anritsu | 36.521-3 15.2.1 CR#2247 catF | LTE_FDD_L_band-UEConTest | Rel-15 |
R5-80 AI: 5.3.18.5 |
agreed | [WTS] [JSN] |
R5-184265 | Editorial correction to Noc for Cell2 on FDD_B1 or FDD_B2 | CR | Anritsu | 36.521-3 15.2.1 CR#2248 catF | TEI12_Test | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184266 | Correction of test case title of 8.2.2.5a.2 | CR | Huawei,HiSilicon | 36.523-2 15.2.0 CR#1190 catF | TEI14_Test, LTE_SRS_switch-UEConTest | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184267 | Cleaning up V2X test cases in TS 36.521-1 |
CR revised to R5-185363 |
Huawei,HiSilicon | 36.521-1 15.2.0 CR#4372 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184268 | Cleaning up the default message contents and test states of V2X | CR | Huawei,HiSilicon | 36.508 15.2.0 CR#1186 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.1 |
agreed | [WTS] [JSN] |
R5-184269 | Addition of test applicabilities of multiple V2X test cases |
CR revised to R5-185374 |
Huawei,HiSilicon | 36.521-2 15.2.0 CR#738 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.4 |
revised | [WTS] [JSN] |
R5-184270 | Addition of TT analysis of V2X TC 12.2.1 | CR | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | 36.903 14.1.0 CR#406 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.6 |
withdrawn | [WTS] [JSN] |
R5-184271 | Addition of TT analysis of V2X TC 12.2.2 | CR | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | 36.903 14.1.0 CR#407 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.6 |
withdrawn | [WTS] [JSN] |
R5-184272 | Addition of TT analysis of V2X TC 12.4 | CR | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | 36.903 14.1.0 CR#408 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.6 |
withdrawn | [WTS] [JSN] |
R5-184273 | Addition of V2X new TC 12.2.1 | CR | Huawei,HiSilicon, Rohde & Schwarz | 36.521-3 15.2.1 CR#2249 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
agreed | [WTS] [JSN] |
R5-184274 | Addition of V2X new TC 12.2.2 |
CR revised to R5-185184 |
Huawei,HiSilicon, Rohde & Schwarz | 36.521-3 15.2.1 CR#2250 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
revised | [WTS] [JSN] |
R5-184275 | Addition of V2X new TC 12.4 | CR | Huawei,HiSilicon, Rohde & Schwarz | 36.521-3 15.2.1 CR#2251 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
withdrawn | [WTS] [JSN] |
R5-184276 | Update of Annex F for TC 12.2.1, 12.2.2 and 12.4 | CR | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | 36.521-3 15.2.1 CR#2252 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
agreed | [WTS] [JSN] |
R5-184277 | Update of TP analysis of CA_3A-7A-8A | CR | Huawei,HiSilicon | 36.905 15.1.0 CR#144 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2. |
agreed | [WTS] [JSN] |
R5-184278 | Addition of TP analysis of CA_1A-7A-8A in 36.905 | CR | Huawei,HiSilicon | 36.905 15.1.0 CR#145 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2. |
agreed | [WTS] [JSN] |
R5-184279 | Addition of TP analysis of CA_1A-3A-7A-8A in 36.905 | CR | Huawei,HiSilicon | 36.905 15.1.0 CR#146 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2. |
agreed | [WTS] [JSN] |
R5-184280 | Addition of TP analysis of CA_7A-42A-42A in 36.905 | CR | Huawei,HiSilicon | 36.905 15.1.0 CR#147 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2. |
agreed | [WTS] [JSN] |
R5-184281 | Addition of TP analysis of CA_20A-42A-42A in 36.905 | CR | Huawei,HiSilicon | 36.905 15.1.0 CR#148 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2. |
agreed | [WTS] [JSN] |
R5-184282 | Update of test frequencies for CA_42A-42A | CR | Huawei,HiSilicon | 36.508 15.2.0 CR#1187 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.1 |
agreed | [WTS] [JSN] |
R5-184283 | Correction of test configuration of CA_20A-42A REFSENS |
CR revised to R5-185493 |
Huawei,HiSilicon | 36.521-1 15.2.0 CR#4373 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184284 | Update of 7.3A.5 REFSENS for Rel-13 CA configurations |
CR revised to R5-185494 |
Huawei,HiSilicon | 36.521-1 15.2.0 CR#4374 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184285 | Addition of REFSENS test configuration of CA_1A-3A-7A-8A | CR | Huawei,HiSilicon | 36.521-1 15.2.0 CR#4375 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184286 | Addition of multiple CA configurations to capability tables in TS 36.521-2 | CR | Huawei,HiSilicon | 36.521-2 15.2.0 CR#739 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.3 |
withdrawn | [WTS] [JSN] |
R5-184287 | Addition of multiple CA configurations to capability tables in TS 36.523-2 | CR | Huawei,HiSilicon | 36.523-2 15.2.0 CR#1191 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 6.3.2.3 |
agreed | [WTS] [JSN] |
R5-184288 | Editorial cleaning up of Rel-14 CA 5DL RSRP measurement TC 9.1.51 |
CR revised to R5-185342 |
Huawei,HiSilicon | 36.521-3 15.2.1 CR#2253 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.4 |
revised | [WTS] [JSN] |
R5-184289 | Addition of Rel-13 B5C new TC 8.16.47 | CR | Huawei,HiSilicon, Bureau Veritas | 36.521-3 15.2.1 CR#2254 catF | LTE_CA_enh_b5C_PUCCH-UEConTest | Rel-15 |
R5-80 AI: 5.3.6.3 |
agreed | [WTS] [JSN] |
R5-184290 | Addition of Rel-13 B5C new TC 8.16.48 | CR | Huawei,HiSilicon, Bureau Veritas | 36.521-3 15.2.1 CR#2255 catF | LTE_CA_enh_b5C_PUCCH-UEConTest | Rel-15 |
R5-80 AI: 5.3.6.3 |
agreed | [WTS] [JSN] |
R5-184291 | Addition of Rel-13 B5C new TC 8.16.49 | CR | Huawei,HiSilicon, Bureau Veritas | 36.521-3 15.2.1 CR#2256 catF | LTE_CA_enh_b5C_PUCCH-UEConTest | Rel-15 |
R5-80 AI: 5.3.6.3 |
agreed | [WTS] [JSN] |
R5-184292 | Addition of Rel-13 B5C new TC 8.16.50 | CR | Huawei,HiSilicon, Bureau Veritas | 36.521-3 15.2.1 CR#2257 catF | LTE_CA_enh_b5C_PUCCH-UEConTest | Rel-15 |
R5-80 AI: 5.3.6.3 |
agreed | [WTS] [JSN] |
R5-184293 | Update of Annex E and Annex F to add cell mapping and TT for 8.16.47-50 | CR | Huawei,HiSilicon | 36.521-3 15.2.1 CR#2258 catF | LTE_CA_enh_b5C_PUCCH-UEConTest | Rel-15 |
R5-80 AI: 5.3.6.3 |
agreed | [WTS] [JSN] |
R5-184294 | Addition of test applicability for Rel-13 B5C new TC 8.16.47-50 | CR | Huawei,HiSilicon | 36.521-2 15.2.0 CR#740 catF | LTE_CA_enh_b5C_PUCCH-UEConTest | Rel-15 |
R5-80 AI: 5.3.6.2 |
agreed | [WTS] [JSN] |
R5-184295 | Discussion on test frequency definition in FR1 | discussion | Huawei,HiSilicon | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184296 | Update of test frequencies of Band n41 and n77 | CR | Huawei,HiSilicon | 38.508-1 15.0.0 CR#11 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
withdrawn | [WTS] [JSN] |
R5-184297 | Addition of Mid channel bandwidth definition for several missing bands | CR | Huawei,HiSilicon | 38.508-1 15.0.0 CR#12 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184298 | Update of common uplink configuration in 6.1 | pCR | Huawei,HiSilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-184299 | Update of FR1 test case 6.2.1 |
pCR revised to R5-185305 |
Huawei,HiSilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184300 | Addition of FR1 test case 6.2.4 |
pCR revised to R5-185322 |
Huawei,HiSilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184301 | Update of FR1 test case 6.3.1 |
pCR revised to R5-185323 |
Huawei,HiSilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184302 | Update of FR1 test case 6.3.3.2 |
pCR revised to R5-185495 |
Huawei,HiSilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184303 | Test Point analysis for FR1 Configured Output Power | pCR | Huawei,HiSilicon | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-184304 | Draft TR 38.903 v0.3.0 | draft TR | Huawei,HiSilicon | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
withdrawn | [WTS] [JSN] | |
R5-184305 | WP - Support for V2V services based on LTE sidelink | Work Plan | Huawei | LTE_SL_V2V-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184306 | SR - Support for V2V services based on LTE sidelink | WI status report | Huawei | LTE_SL_V2V-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184307 | WP - Support for V2X services | Work Plan | Huawei | LTE_V2X-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184308 | SR - Support for V2X services | WI status report | Huawei | LTE_V2X-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184309 | WP - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell | Work Plan | Huawei | LTE_CA_enh_b5C_PUCCH-UEConTest | Rel-13 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184310 | SR - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell | WI status report | Huawei | LTE_CA_enh_b5C_PUCCH-UEConTest | Rel-13 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184311 | WP - Rel-14 eNB-IoT | Work Plan | Huawei | NB_IOTenh-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184312 | SR - Rel-14 eNB-IoT | WI status report | Huawei | NB_IOTenh-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184313 | Demodulation test case 8.11.1.1.1 and 8.11.1.1.2 updated for category M2 | CR | Ericsson | 36.521-1 15.2.0 CR#4376 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.2 |
agreed | [WTS] [JSN] |
R5-184314 | Update of Test Tolerance analyses for TDD-FDD CA PDSCH Closed Loop Single Layer Spatial Multiplexing 2x4 with TM4 Interference Model-Enhanced Performance Requirement Type A (2DL CA) | CR | LG Electronics | 36.904 13.2.0 CR#56 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-13 |
R5-80 AI: 5.3.10.6 |
agreed | [WTS] [JSN] |
R5-184315 | Update of Test Tolerance analyses for TDD-FDD CA PDSCH Single-layer Spatial Multiplexing 2x4 on antenna ports 7 or 8 with TM9 Interference Model-Enhanced Performance Requirement Type A (2DL CA) | CR | LG Electronics | 36.904 13.2.0 CR#57 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-13 |
R5-80 AI: 5.3.10.6 |
agreed | [WTS] [JSN] |
R5-184316 | Update of TDD-FDD CA PDSCH Closed Loop Single Layer Spatial Multiplexing 2x4 with TM4 Interference Model-Enhanced Performance Requirement Type A (2DL CA) | CR | LG Electronics | 36.521-1 15.2.0 CR#4377 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.2 |
agreed | [WTS] [JSN] |
R5-184317 | Update of TDD-FDD CA PDSCH Single-layer Spatial Multiplexing 2x4 on antenna ports 7 or 8 with TM9 Interference Model-Enhanced Performance Requirement Type A (2DL CA) | CR | LG Electronics | 36.521-1 15.2.0 CR#4378 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.2 |
agreed | [WTS] [JSN] |
R5-184318 | Correct IE GSCN-ValueNR |
CR revised to R5-185035 |
Ericsson | 38.508-1 15.0.0 CR#13 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184319 | WP - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 (UID-790058) | Work Plan | China Unicom | LTE450_Reg3-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184320 | SR - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 for RAN5#80 | WI status report | China Unicom | LTE450_Reg3-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184321 | SR - LTE_QMC_Streaming-UEConTest (UID-790051) for RAN5#80 | WI status report | China Unicom | LTE_QMC_Streaming-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184322 | Correction to NB-IoT test cases 22.4.8 and 22.4.9 |
CR revised to R5-185016 |
ANRITSU LTD | 36.523-1 15.2.0 CR#4596 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
revised | [WTS] [JSN] |
R5-184323 | Correction to SSAC connected mode test cases 13.5.1a and 13.5.3a for IMS Enabled UE |
CR revised to R5-185126 |
Keysight Technologies UK Ltd | 36.523-1 15.2.0 CR#4597 catF | TEI12_Test | Rel-15 |
R5-80 AI: 6.4.3.8 |
revised | [WTS] [JSN] |
R5-184324 | Addition of 5GS NR SDAP test case 7.1.4.1 |
CR revised to R5-185064 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#15 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184325 | 36.521-2 updates for category M2 test cases | CR | Ericsson | 36.521-2 15.2.0 CR#741 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.3 |
agreed | [WTS] [JSN] |
R5-184326 | New test case: 6.2.3A.3_2, Maximum Power Reduction (MPR) for CA (intra-band non-contiguous DL CA and UL CA) for UL 256QAM |
CR revised to R5-185426 |
Ericsson | 36.521-1 15.2.0 CR#4379 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
revised | [WTS] [JSN] |
R5-184327 | Adding condition for CP-OFDM waveform | CR | Ericsson | 38.508-1 15.0.0 CR#14 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184328 | WP - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation | Work Plan | Sprint Corporation | LTE_CA_C_B41_PC2-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184329 | SR - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation | WI status report | Sprint Corporation | LTE_CA_C_B41_PC2-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184330 | Adding support for test SCS definition | CR | Ericsson | 38.508-1 15.0.0 CR#15 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
withdrawn | [WTS] [JSN] |
R5-184331 | Correction to Idle mode Inter-RAT G<>E test case 6.2.3.21 to allow optional IMS registration on EUTRAN cell |
CR revised to R5-185004 |
Keysight Technologies UK Ltd, Samsung | 36.523-1 15.2.0 CR#4598 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.1 |
revised | [WTS] [JSN] |
R5-184332 | Test Frequencies |
CR revised to R5-185173 |
Sprint Corporation, Ericsson | 38.508-1 15.0.0 CR#16 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.2.1 |
revised | [WTS] [JSN] |
R5-184333 | Updates to Annex B | CR | MCC TF160 | 38.523-3 15.0.0 CR#2 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.6 |
agreed | [WTS] [JSN] |
R5-184334 | New Work Item Proposal: UE Conformance Test Aspects - Addition of Power Class 1 UE to bands B31/B72 for LTE |
WID new revised to R5-185127 |
Airbus DS SLC | Rel-15 |
R5-80 AI: 4.5.3 |
revised | [WTS] [JSN] | ||
R5-184335 | Band 41 HPUE Maximum Output Power |
CR revised to R5-185548 |
CMCC | 36.521-1 15.2.0 CR#4380 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2 |
revised | [WTS] [JSN] |
R5-184336 | Correction of applicability to TS 36.521-2 for HPUE RF test cases |
CR revised to R5-185541 |
CMCC | 36.521-2 15.2.0 CR#742 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
revised | [WTS] [JSN] |
R5-184337 | New WID on UE Conformance Test Aspects - ProSe Support for Band 72 in LTE |
WID new revised to R5-185128 |
Airbus DS SLC | Rel-15 |
R5-80 AI: 4.5.3 |
revised | [WTS] [JSN] | ||
R5-184338 | Correction to 5GS MAC Test case 7.1.1.1.2 Random access procedure / Successful / C-RNTI Based / Preamble selected by MAC itself |
CR revised to R5-185065 |
Qualcomm Korea | 38.523-1 15.0.0 CR#16 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184339 | Update of FR1 signal levels |
CR revised to R5-185036 |
ANRITSU LTD | 38.508-1 15.0.0 CR#17 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.2.2 |
revised | [WTS] [JSN] |
R5-184340 | Correction to 5GS MAC Test case 7.1.1.5.3 DRX operation / Short cycle configured / Parameters configured by RRC |
CR revised to R5-185066 |
Qualcomm Korea | 38.523-1 15.0.0 CR#17 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184341 | Correction to 5GS RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation |
CR revised to R5-185067 |
Qualcomm Korea | 38.523-1 15.0.0 CR#18 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184342 | Correction to 5GS RLC Test case 7.1.2.3.11 AM RLC / RLC re-establishment procedure |
CR revised to R5-185068 |
Qualcomm Korea | 38.523-1 15.0.0 CR#19 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184343 | Correction to 5GS PDCP Test case 7.1.3.4.1 PDCP handover / Lossless handover / PDCP sequence number maintenance / PDCP status report to convey the information on missing or acknowledged PDCP SDUs at handover / In-order delivery and duplicate elimination in the downlink | CR | Qualcomm Korea | 38.523-1 15.0.0 CR#20 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184344 | Correction to 5GS PDCP Test case 7.1.3.5.4 PDCP reordering / Maximum re-ordering delay below t-Reordering / t-Reordering timer operations | CR | Qualcomm Korea | 38.523-1 15.0.0 CR#21 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184345 | Addition of NR CA / NR SCell addition / modification / release / Success test cases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 |
CR revised to R5-185069 |
Qualcomm Korea | 38.523-1 15.0.0 CR#22 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184346 | Modified RRC_Connected procedure for Multi PDN throughout the test case. |
CR revised to R5-185163 |
Qualcomm Korea | 38.508-1 15.0.0 CR#18 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184347 | Modified RRC_IDLE procedure to allow multi PDN configuration throughout the test case | CR | Qualcomm Korea | 38.508-1 15.0.0 CR#19 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-184348 | Update EN-DC Generic Procedure Parameter for Multi-PDN addition throughout Test Case |
CR revised to R5-185165 |
Qualcomm Korea | 38.508-1 15.0.0 CR#20 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184349 | Modification of EPS & Data Radio Bearer ID mapping for EN-DC Test cases |
CR revised to R5-185166 |
Qualcomm Korea | 36.508 15.2.0 CR#1188 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13. |
revised | [WTS] [JSN] |
R5-184350 | Multi-PDN Handling in EN-DC |
discussion revised to R5-185025 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.19 |
revised | [WTS] [JSN] | |
R5-184351 | ASN.1 Version Handling for NSA and SA |
discussion revised to R5-185026 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.19 |
revised | [WTS] [JSN] | |
R5-184352 | Addition of Test frequency for EN-DC B1_n78 |
CR revised to R5-185178 |
Qualcomm Korea | 38.508-1 15.0.0 CR#21 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.2.2 |
revised | [WTS] [JSN] |
R5-184353 | Corrections to RRC TC - BandwidthPart Configuration / SCG / EN-DC | CR | Qualcomm Tech. Netherlands B.V | 38.523-1 15.0.0 CR#23 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184354 | Corrections to RRC TC - PSCell addition, modification and release / SCG DRB / EN-DC |
CR revised to R5-185149 |
Qualcomm Tech. Netherlands B.V | 38.523-1 15.0.0 CR#24 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184355 | Corrections to RRC TC - Bearer Modification / Handling for bearer type change with security key change / EN-DC |
CR revised to R5-185150 |
Qualcomm Tech. Netherlands B.V | 38.523-1 15.0.0 CR#25 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184356 | Corrections to RRC TC - Bearer Modification / Uplink data path / Split DRB Reconfiguration / EN-DC |
CR revised to R5-185151 |
Qualcomm Tech. Netherlands B.V | 38.523-1 15.0.0 CR#26 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184357 | Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC |
CR revised to R5-185070 |
Qualcomm Tech. Netherlands B.V | 38.523-1 15.0.0 CR#27 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184358 | Addition of IP Connectivity check procedure |
CR revised to R5-185037 |
Qualcomm Tech. Netherlands B.V | 38.508-1 15.0.0 CR#22 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184359 | Handling of Unified Access Control test cases in SA | discussion | Qualcomm Tech. Netherlands B.V | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.19 |
noted | [WTS] [JSN] | |
R5-184360 | Test Engineer | CR | TEOCO | 36.521-1 15.2.0 CR#4381 catB | LTE_NAICS-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
withdrawn | [WTS] [JSN] |
R5-184361 | Discussion_38.521-3_ApplicabilityRules |
discussion revised to R5-185558 |
Qualcomm Europe Inc. (Spain) | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184362 | FR2_38.521-3_Applicability_SpuriousEmissions |
pCR revised to R5-185559 |
Qualcomm Europe Inc. (Spain) | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184363 | FR2_38.522_Applicability_SpuriousEmissions |
pCR revised to R5-185560 |
Qualcomm Europe Inc. (Spain) | 38.522 0.3.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.8 |
revised | [WTS] [JSN] |
R5-184364 | Discussion_FR2_EVM_UBF_usage | discussion | Qualcomm Europe Inc. (Spain) | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184365 | Discussion_FR2_RefSens_RSRP_vs_EIS | discussion | Qualcomm Europe Inc. (Spain) | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184366 | Discussion_FR2_RefSens_TestPointAnalysis | discussion | Qualcomm Europe Inc. (Spain) | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184367 | FR2_RefSens_TestConfig_38.521-2 |
pCR revised to R5-185187 |
Qualcomm Europe Inc. (Spain) | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184368 | Discussion_FR2_StoreTxRxBeamPeakCoordinates |
discussion revised to R5-185561 |
Qualcomm Europe Inc. (Spain) | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] | ||
R5-184369 | FR2_StoreTxRxBeamPeakCoordinates_38.521-2 |
pCR revised to R5-185562 |
Qualcomm Europe Inc. (Spain) | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184370 | FR2_StoreTxRxBeamPeakCoordinates_38.521-3 |
pCR revised to R5-185563 |
Qualcomm Europe Inc. (Spain) | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184371 | FR2_TxSpurious_TestPointAnalysis |
discussion revised to R5-185489 |
Qualcomm Europe Inc. (Spain) | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] | ||
R5-184372 | FR2_TxSpurious_TestConfig_38.521-2 |
pCR revised to R5-185490 |
Qualcomm Europe Inc. (Spain) | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184373 | FR2_UE_BeamlockInvoke_38.521-2 |
pCR revised to R5-185555 |
Qualcomm Europe Inc. (Spain) | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184374 | Update of TC 8.9.1.2.2_1 TDD PDSCH Closed Loop Single Layer Spatial Multiplexing for UE category 1bis | CR | CAICT | 36.521-1 15.2.0 CR#4382 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-184375 | Introduction of TC 6.1.1_2 E-UTRAN FDD Intra-frequency RRC Re-establishment for UE Category 1bis | CR | CAICT | 36.521-3 15.2.1 CR#2259 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184376 | Introduction of TC 6.1.2_2 E-UTRAN FDD Inter-frequency RRC Re-establishment for UE Category 1bis | CR | CAICT | 36.521-3 15.2.1 CR#2260 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184377 | Introduction of TC 6.1.3_2 E-UTRAN TDD Intra-frequency RRC Re-establishment for UE Category 1bis | CR | CAICT | 36.521-3 15.2.1 CR#2261 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184378 | Introduction of TC 6.1.4_2 E-UTRAN TDD Inter-frequency RRC Re-establishment for UE Category 1bis | CR | CAICT | 36.521-3 15.2.1 CR#2262 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184379 | Annex E,F RRM Cat1bis 6.1.x tests | CR | CAICT | 36.521-3 15.2.1 CR#2263 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-184380 | New feMTC test case 7.5EC Adjacent Channel Selectivity (ACS) for UE category M2 | CR | CAICT | 36.521-1 15.2.0 CR#4383 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.2 |
agreed | [WTS] [JSN] |
R5-184381 | New feMTC test case 7.6.1EC In-band blocking for UE category M2 | CR | CAICT | 36.521-1 15.2.0 CR#4384 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.2 |
agreed | [WTS] [JSN] |
R5-184382 | New feMTC test case 7.6.3EC Narrow band blocking for UE category M2 | CR | CAICT | 36.521-1 15.2.0 CR#4385 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.2 |
agreed | [WTS] [JSN] |
R5-184383 | New feMTC test case 7.8.1EC Wide band intermodulation for UE category M2 | CR | CAICT | 36.521-1 15.2.0 CR#4386 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.2 |
agreed | [WTS] [JSN] |
R5-184384 | Update of Annexes F.1.3 and F.3.3 | CR | CAICT | 36.521-1 15.2.0 CR#4387 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.2 |
agreed | [WTS] [JSN] |
R5-184385 | Update of TC 6.6.2.3A.4 Adjacent Channel Leakage power Ratio for CA (3UL CA) | CR | CAICT | 36.521-1 15.2.0 CR#4388 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184386 | WP UE Conformance Test Aspects - FDD operating band in the L-band for LTE | Work Plan | NTT DOCOMO, INC. | LTE_FDD_L_band-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184387 | SR UE Conformance Test Aspects - FDD operating band in the L-band for LTE | WI status report | NTT DOCOMO, INC. | LTE_FDD_L_band-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184388 | Update of TC 6.6.3.1A.4 Transmitter Spurious emissions for CA ( 3UL CA) | CR | CAICT | 36.521-1 15.2.0 CR#4389 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184389 | Addition of Band 74 information into TS 34.121-1 |
CR revised to R5-185516 |
NTT DOCOMO, INC. | 34.121-1 15.1.0 CR#1656 catF | LTE_FDD_L_band-UEConTest | Rel-15 |
R5-80 AI: 5.3.18.1 |
revised | [WTS] [JSN] |
R5-184390 | Updates of Band 74 information about Tx test cases in TS 36.521-1 |
CR revised to R5-185517 |
NTT DOCOMO, INC. | 36.521-1 15.2.0 CR#4390 catF | LTE_FDD_L_band-UEConTest | Rel-15 |
R5-80 AI: 5.3.18.3 |
revised | [WTS] [JSN] |
R5-184391 | WP - LTE_QMC_Streaming-UEConTest (UID-790051) | Work Plan | China Unicom | LTE_QMC_Streaming-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184392 | Updates of FR1 TRx MU in Annex F |
pCR revised to R5-185444 |
NTT DOCOMO, INC. | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184393 | Updates of 6.2.3.2 Test Frequency for CA_8A-27A |
CR revised to R5-185023 |
KT Corp. | 36.508 15.2.0 CR#1189 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 6.3.17.1 |
revised | [WTS] [JSN] |
R5-184394 | Proposal on Test Tolerance table format in TS 38.521-1 Annex F | discussion | NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-184395 | Updates of FR1 TRx TT in Annex F |
pCR revised to R5-185565 |
NTT DOCOMO, INC. | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184396 | New CA band combination CA_8A-27A - Updates of 7.3A Refsens | CR | KT Corp. | 36.521-1 15.2.0 CR#4391 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-184397 | Proposal on MU and TT table format in TS 38.521-2 |
discussion revised to R5-185518 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184398 | Updates of FR2 TRx MU and TT in Annex |
pCR revised to R5-185519 |
NTT DOCOMO, INC. | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184399 | New CA band combination CA_8A-27A - Updates of Table A.4.3.3.3-3 | CR | KT Corp. | 36.523-2 15.2.0 CR#1192 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 6.3.17.3 |
agreed | [WTS] [JSN] |
R5-184400 | MU and TT of EN-DC test cases in TS 38.521-3 |
discussion revised to R5-185531 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184401 | New CA band combination CA_8A-27A - Updates of Table A.4.6.3-3 | CR | KT Corp. | 36.521-2 15.2.0 CR#743 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.3 |
withdrawn | [WTS] [JSN] |
R5-184402 | Addition of TRx MU and TT in TS 38.521-3 Annex |
pCR revised to R5-185520 |
NTT DOCOMO, INC. | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184403 | New test case 6.3.5FA.1 Power Control Absolute power tolerance for category NB1 and NB2/Power Class 6 |
CR revised to R5-185497 |
CAICT | 36.521-1 15.2.0 CR#4392 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
revised | [WTS] [JSN] |
R5-184404 | Correction of 6.2.3.2 Test Frequency for CA_3A-27A |
CR revised to R5-185003 |
KT Corp. | 36.508 15.2.0 CR#1190 catF | TEI12_Test | Rel-15 |
R5-80 AI: 6.4.1 |
revised | [WTS] [JSN] |
R5-184405 | New test case 6.3.5FA.2 Power Control Relative power tolerance for category NB1 and NB2/Power Class 6 |
CR revised to R5-185498 |
CAICT | 36.521-1 15.2.0 CR#4393 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
revised | [WTS] [JSN] |
R5-184406 | New test case 6.3.5FA.3 Aggregate power control tolerance for category NB1 and NB2/Power Class 6 |
CR revised to R5-185499 |
CAICT | 36.521-1 15.2.0 CR#4394 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
revised | [WTS] [JSN] |
R5-184407 | Discussion on the structure of Clause 7.3A Reference sensitivity for CA in TS 38.521-1 | discussion | CMCC, Huawei | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184408 | Discussion on the structure of Clause 7.7A Spurious response for CA in TS 38.521-1 | discussion | CMCC, Huawei | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184409 | Addition of TT analysis of V2X TC 12.2.1 | CR | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | 36.903 14.1.0 CR#409 catF | LTE_V2X-UEConTest | Rel-14 |
R5-80 AI: 5.3.12.6 |
agreed | [WTS] [JSN] |
R5-184410 | Addition of TT analysis of V2X TC 12.2.2 | CR | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | 36.903 14.1.0 CR#410 catF | LTE_V2X-UEConTest | Rel-14 |
R5-80 AI: 5.3.12.6 |
agreed | [WTS] [JSN] |
R5-184411 | Addition of TT analysis of V2X TC 12.4 | CR | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | 36.903 14.1.0 CR#411 catF | LTE_V2X-UEConTest | Rel-14 |
R5-80 AI: 5.3.12.6 |
agreed | [WTS] [JSN] |
R5-184412 | Update to test case 6.5.2A.1.4 for 3UL CA | CR | KTL | 36.521-1 15.2.0 CR#4395 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184413 | Update to test case 6.5.2A.2.4 for 3UL CA | CR | KTL | 36.521-1 15.2.0 CR#4396 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184414 | Update to test case 6.5.2A.3.4 for 3UL CA | CR | KTL | 36.521-1 15.2.0 CR#4397 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184415 | Update to test case 7.6.3A.8 and 7.8.1A.8 for 5DL CA | CR | KTL | 36.521-1 15.2.0 CR#4398 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184416 | Cleanning up SDR test cases for 4CC and 5CC using UL RMC | CR | KTL | 36.521-1 15.2.0 CR#4399 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184417 | Update to Performance test cases for LTE DL CA 4 Rx antenna ports | CR | KTL | 36.521-1 15.2.0 CR#4400 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.2 |
agreed | [WTS] [JSN] |
R5-184418 | Update to test case 6.3.2G.1 for V2V services based on LTE sidelink |
CR revised to R5-185355 |
KTL | 36.521-1 15.2.0 CR#4401 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
revised | [WTS] [JSN] |
R5-184419 | Update to test case 6.3.2G.2 for LTE-based V2X Services |
CR revised to R5-185364 |
KTL | 36.521-1 15.2.0 CR#4402 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184420 | Update to test case 6.3.2G.3 for LTE-based V2X Services |
CR revised to R5-185365 |
KTL | 36.521-1 15.2.0 CR#4403 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184421 | Update to RRM test case 8.16.70 and 8.16.74 for 5DL CA | CR | KTL | 36.521-3 15.2.1 CR#2264 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.4 |
agreed | [WTS] [JSN] |
R5-184422 | Treatment of power supply cable for FR2 UE tests |
discussion revised to R5-185525 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184423 | Meeting notes of offline call on FR2 UE common test setup | other | Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184424 | Common test setup for FR2 measurement uncertainty estimation | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184425 | Testability issue of maximum input level and ACS (case 2) in FR2 | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184426 | Estimation of measurement uncertainty for FR2 TRx test cases |
discussion revised to R5-185335 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184427 | Removing brackets from MU values in FR2 |
discussion revised to R5-185336 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184428 | TP to remove editor's note on frequency range of Tx Spurious emission | pCR | Anritsu | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
withdrawn | [WTS] [JSN] |
R5-184429 | Offset in quality of quiet zone evaluation |
discussion revised to R5-185526 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184430 | TP on common test setup in FR2 | pCR | Anritsu | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
withdrawn | [WTS] [JSN] |
R5-184431 | Testability issue of low PSD test cases in FR2 |
discussion revised to R5-185527 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184432 | New WID for Rel-16 LTE CA |
WID new revised to R5-185000 |
Ericsson | Rel-16 |
R5-80 AI: 4.1 |
revised | [WTS] [JSN] | ||
R5-184433 | GCF 3GPP TCL after CAG#55 (GCF-CC v3.71.1 vs v3.70.2) | report | Ericsson |
R5-80 AI: 2.2 |
noted | [WTS] [JSN] | |||
R5-184434 | RAN5#80 summary of changes to RAN5 test cases with potential impact on GCF and PTCRB | report | Ericsson, Samsung |
R5-80 AI: 7.5 |
noted | [WTS] [JSN] | |||
R5-184435 | WP UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | Work Plan | Ericsson | LTE_UTRA_IncMon-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184436 | SR UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | WI status report | Ericsson | LTE_UTRA_IncMon-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184437 | WP UE Conformance Test Aspects - Rel-13 CA configurations | Work Plan | Ericsson | LTE_CA_Rel13-UEConTest |
R5-80 AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-184438 | SR UE Conformance Test Aspects - Rel-13 CA configurations | WI status report | Ericsson | LTE_CA_Rel13-UEConTest |
R5-80 AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-184439 | WP UE Conformance Test Aspects - Rel-14 CA configurations | Work Plan | Ericsson | LTE_CA_R14-UEConTest |
R5-80 AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-184440 | SR UE Conformance Test Aspects - Rel-14 CA configurations | WI status report | Ericsson | LTE_CA_R14-UEConTest |
R5-80 AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-184441 | WP UE Conformance Test Aspects - Rel-15 CA configurations | Work Plan | Ericsson | LTE_CA_R15-UEConTest |
R5-80 AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-184442 | SR UE Conformance Test Aspects - Rel-15 CA configurations | WI status report | Ericsson | LTE_CA_R15-UEConTest |
R5-80 AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-184443 | WP UE Conformance Test Aspects - 5G system with NR and LTE | Work Plan | Ericsson | 5GS_NR_LTE-UEConTest |
R5-80 AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-184444 | SR UE Conformance Test Aspects - 5G system with NR and LTE | WI status report | Ericsson | 5GS_NR_LTE-UEConTest |
R5-80 AI: 7.4.2 |
available | [WTS] [JSN] | ||
R5-184445 | Update of RAN5 5G NR phases and target update RAN5#80 | discussion | Ericsson | 5GS_NR_LTE-UEConTest |
R5-80 AI: 7.2.3 |
not concluded | [WTS] [JSN] | ||
R5-184446 | Revised WID on: UE Conformance Test Aspects - 5G system with NR and LTE | WID revised | Ericsson | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
reserved | [WTS] [JSN] | |
R5-184447 | 3GPP RAN5 CA status list (pre-RAN5#80 meeting) | other | Ericsson |
R5-80 AI: 2.2 |
noted | [WTS] [JSN] | |||
R5-184448 | 3GPP RAN5 CA status list (post-RAN5#80 meeting) | other | Ericsson |
R5-80 AI: 7.5 |
noted | [WTS] [JSN] | |||
R5-184449 | Discussion paper on principles for defining NR test frequencies and selecting associated parameters for SS to signal |
discussion revised to R5-185001 |
Ericsson, Sprint, MCC TF160 | 5GS_NR_LTE-UEConTest |
R5-80 AI: 4.2.1 |
revised | [WTS] [JSN] | ||
R5-184450 | Introduction of test frequencies for NR band n1 |
CR revised to R5-185250 |
Ericsson | 38.508-1 15.0.0 CR#23 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184451 | Introduction of test frequencies for NR band n2 |
CR revised to R5-185251 |
Ericsson | 38.508-1 15.0.0 CR#24 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184452 | Introduction of test frequencies for NR band n3 |
CR revised to R5-185252 |
Ericsson | 38.508-1 15.0.0 CR#25 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184453 | Introduction of test frequencies for NR band n5 |
CR revised to R5-185253 |
Ericsson | 38.508-1 15.0.0 CR#26 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184454 | Introduction of test frequencies for NR band n7 |
CR revised to R5-185254 |
Ericsson | 38.508-1 15.0.0 CR#27 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184455 | Introduction of test frequencies for NR band n8 |
CR revised to R5-185255 |
Ericsson | 38.508-1 15.0.0 CR#28 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184456 | Introduction of test frequencies for NR band n12 |
CR revised to R5-185256 |
Ericsson | 38.508-1 15.0.0 CR#29 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184457 | Introduction of test frequencies for NR band n20 |
CR revised to R5-185257 |
Ericsson | 38.508-1 15.0.0 CR#30 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184458 | Introduction of test frequencies for NR band n25 |
CR revised to R5-185258 |
Ericsson | 38.508-1 15.0.0 CR#31 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184459 | Introduction of test frequencies for NR band n28 |
CR revised to R5-185259 |
Ericsson | 38.508-1 15.0.0 CR#32 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184460 | Introduction of test frequencies for NR band n34 |
CR revised to R5-185260 |
Ericsson | 38.508-1 15.0.0 CR#33 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184461 | Introduction of test frequencies for NR band n38 |
CR revised to R5-185261 |
Ericsson | 38.508-1 15.0.0 CR#34 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184462 | Introduction of test frequencies for NR band n39 |
CR revised to R5-185262 |
Ericsson | 38.508-1 15.0.0 CR#35 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184463 | Introduction of test frequencies for NR band n40 |
CR revised to R5-185263 |
Ericsson | 38.508-1 15.0.0 CR#36 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184464 | Update of test frequencies for NR band n41 |
CR revised to R5-185264 |
Ericsson, Sprint | 38.508-1 15.0.0 CR#37 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184465 | Introduction of test frequencies for NR band n51 |
CR revised to R5-185265 |
Ericsson | 38.508-1 15.0.0 CR#38 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184466 | Introduction of test frequencies for NR band n66 |
CR revised to R5-185266 |
Ericsson, Dish Network | 38.508-1 15.0.0 CR#39 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184467 | Introduction of test frequencies for NR band n70 |
CR revised to R5-185267 |
Ericsson, Dish Network | 38.508-1 15.0.0 CR#40 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184468 | Update of test frequencies for NR band n71 |
CR revised to R5-185268 |
Ericsson, Dish Network | 38.508-1 15.0.0 CR#41 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184469 | Introduction of test frequencies for NR band n75 |
CR revised to R5-185269 |
Ericsson | 38.508-1 15.0.0 CR#42 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184470 | Introduction of test frequencies for NR band n76 |
CR revised to R5-185270 |
Ericsson | 38.508-1 15.0.0 CR#43 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184471 | Introduction of test frequencies for NR band n77 | CR | Ericsson | 38.508-1 15.0.0 CR#44 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184472 | Introduction of test frequencies for NR band n78 | CR | Ericsson | 38.508-1 15.0.0 CR#45 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184473 | Introduction of test frequencies for NR band n79 | CR | Ericsson | 38.508-1 15.0.0 CR#46 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184474 | Introduction of test frequencies for NR band n257 | CR | Ericsson | 38.508-1 15.0.0 CR#47 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184475 | Introduction of test frequencies for NR band n258 | CR | Ericsson | 38.508-1 15.0.0 CR#48 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184476 | Introduction of test frequencies for NR band n260 | CR | Ericsson, Bureau Veritas | 38.508-1 15.0.0 CR#49 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184477 | Introduction of test frequencies for NR band n261 | CR | Ericsson | 38.508-1 15.0.0 CR#50 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184478 | Introduction of test frequencies for signalling testing in clause 6 |
CR revised to R5-185177 |
Ericsson, TF160 | 38.508-1 15.0.0 CR#51 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.2.2 |
revised | [WTS] [JSN] |
R5-184479 | Update to FR1 test case 6.5.4 Transmit intermodulation |
pCR revised to R5-185445 |
KTL | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184480 | New test case 6.5.2.1FA.1 Error Vector Magnitude (EVM) for category NB1 and NB2/Power Class 6 | CR | CAICT | 36.521-1 15.2.0 CR#4404 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
withdrawn | [WTS] [JSN] |
R5-184481 | New test case 6.5.2.2FA Carrier leakage for category NB1 and NB2/Power Class 6 | CR | CAICT | 36.521-1 15.2.0 CR#4405 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
withdrawn | [WTS] [JSN] |
R5-184482 | New test case 6.5.2.3FA In-band emissions for non allocated RB for category NB1 and NB2/Power Class 6 | CR | CAICT | 36.521-1 15.2.0 CR#4406 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
withdrawn | [WTS] [JSN] |
R5-184483 | Add and use reference to NG.108 | CR | ROHDE & SCHWARZ, Qualcomm Incorporated | 34.229-1 14.3.0 CR#1291 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-14 |
R5-80 AI: 6.5.6.1 |
agreed | [WTS] [JSN] |
R5-184484 | Proposal for remaining Maximum Test System Uncertainty for NR FR1 TRx tests | discussion | Anritsu, ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-184485 | Test approach of EN-DC Rx tests with multiple LTE/NR CCs |
discussion revised to R5-185529 |
Anritsu | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184486 | Correction to power level for FR1 RF tests |
CR revised to R5-185443 |
Anritsu | 38.508-1 15.0.0 CR#52 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184487 | Discussion on FR2 TRx spurious test procedure |
discussion revised to R5-185347 |
Anritsu | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184488 | Discussion on UL RMC for FR2 spurious test |
discussion revised to R5-185533 |
Anritsu | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184489 | Discussion on test point selection for NR Out-of-band in FR1 |
discussion revised to R5-185301 |
CAICT | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184490 | Introduction of TC 7.6.3 Out-of-band blocking |
pCR revised to R5-185524 |
CAICT | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184491 | Clean up EN-DC FR1 TRx TCs | pCR | Anritsu | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
withdrawn | [WTS] [JSN] |
R5-184492 | Add Test Tolerance and Annex F for NAICS feature applicable in test case 8.3.1.1.7 and 8.3.2.1.8. | CR | TEOCO | 36.521-1 12.9.0 CR#4407 catF | TEI12_Test | Rel-12 |
R5-80 AI: 5.4.1.2 |
withdrawn | [WTS] [JSN] |
R5-184493 | Correction of NB-IoT test case 22.5.20 | CR | CATT, TDIA | 36.523-1 15.2.0 CR#4599 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-184494 | Correction of NB-IoT test case 22.5.21 | CR | CATT, TDIA | 36.523-1 15.2.0 CR#4600 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-184495 | Addition of new 5GC TC 9.1.2.1 | CR | CATT, TDIA | 38.523-1 15.0.0 CR#28 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184496 | Addition of applicability and tests conditions for 5GC test cases 8.2.4.3.1.2, 8.2.4.3.1.3, 9.1.2.1 and 9.1.2.2 |
CR revised to R5-185102 |
CATT, TDIA | 38.523-2 15.0.0 CR#2 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.5 |
revised | [WTS] [JSN] |
R5-184497 | Discussion on Uplink configuration for NR Transmit Intermodulation in FR1 |
discussion revised to R5-185423 |
KTL | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184498 | Correction to 5GS RRC TC 8.2.4.3.1.1 |
CR revised to R5-185071 |
TDIA, CATT | 38.523-1 15.0.0 CR#29 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184499 | Addition of 5GS RRC TC 8.2.4.3.1.2 |
CR revised to R5-185072 |
TDIA, CATT | 38.523-1 15.0.0 CR#30 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184500 | Addition of new 5GS RRC TC 8.2.4.3.1.3 | CR | TDIA, CATT | 38.523-1 15.0.0 CR#31 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184501 | Addition to NB-IoT testcase 22.3.1.6a |
CR revised to R5-185115 |
TDIA, CATT, Starpoint | 36.523-1 15.2.0 CR#4601 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-184502 | Addition of antenna diagrams for IncMon RRM test cases |
CR revised to R5-185454 |
Ericsson | 36.508 15.2.0 CR#1191 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.4 |
revised | [WTS] [JSN] |
R5-184503 | Update of number of DL PDCP SDUs in test cases 7.1.7.1.x |
CR revised to R5-185005 |
MediaTek Inc. | 36.523-1 15.2.0 CR#4602 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.3.2.1 |
revised | [WTS] [JSN] |
R5-184504 | Update of DL 256QAM TCs for high UE DL Categories |
CR revised to R5-185006 |
MediaTek Inc. | 36.523-1 15.2.0 CR#4603 catF | TEI12_Test, LTE_SC_enh_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.2.1 |
revised | [WTS] [JSN] |
R5-184505 | Correction to RRC TC 8.5.4.1 |
CR revised to R5-185007 |
MediaTek Inc. | 36.523-1 15.2.0 CR#4604 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.3.3.1 |
revised | [WTS] [JSN] |
R5-184506 | Correction to RRC TC 8.5.4.3 | CR | MediaTek Inc. | 36.523-1 15.2.0 CR#4605 catF | TEI13_Test | Rel-15 |
R5-80 AI: 6.4.3.3.1 |
withdrawn | [WTS] [JSN] |
R5-184507 | Correction to EMM TC 9.2.1.1.24 | CR | MediaTek Inc. | 36.523-1 15.2.0 CR#4606 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.4 |
agreed | [WTS] [JSN] |
R5-184508 | Correction to ESM TC 10.5.4 | CR | MediaTek Inc. | 36.523-1 15.2.0 CR#4607 catF | TEI10_Test | Rel-15 |
R5-80 AI: 6.4.3.5 |
agreed | [WTS] [JSN] |
R5-184509 | Handling on TT defining from MU in FR2 | discussion | NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-184510 | Correction to CSFB TC 13.1.12 | CR | MediaTek Inc. | 36.523-1 15.2.0 CR#4608 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.8 |
agreed | [WTS] [JSN] |
R5-184511 | Updates of receiver test cases for CA_XA-YE |
CR revised to R5-185514 |
NTT DOCOMO, INC. | 36.521-1 15.2.0 CR#4408 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
revised | [WTS] [JSN] |
R5-184512 | Correction to applicability of TC 7.1.7.1.6a | CR | MediaTek Inc. | 36.523-2 15.2.0 CR#1193 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184513 | Correction to applicability of DL 256QAM TCs | CR | MediaTek Inc. | 36.523-2 15.2.0 CR#1194 catF | TEI12_Test, LTE_SC_enh_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184514 | Editorial correction of referred table number | CR | MediaTek Inc. | 36.523-2 15.2.0 CR#1195 catF | TEI10_Test | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184515 | Addition of message content for RRM IncMon test cases |
CR revised to R5-185455 |
Ericsson | 36.508 15.2.0 CR#1192 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.4 |
revised | [WTS] [JSN] |
R5-184516 | Updates of receiver test cases for CA_XA-YD |
CR revised to R5-185515 |
NTT DOCOMO, INC. | 36.521-1 15.2.0 CR#4409 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
revised | [WTS] [JSN] |
R5-184517 | Correction to NR PDCP test case 7.1.3.4.2 | CR | Keysight Technologies UK Ltd, MCC TF160 | 38.523-1 15.0.0 CR#32 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184518 | Correction to NB-IoT test case 22.2.9 |
CR revised to R5-185018 |
ANRITSU LTD | 36.523-1 15.2.0 CR#4609 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
revised | [WTS] [JSN] |
R5-184519 | Addition of applicability of RRM IncMon test cases |
CR revised to R5-185453 |
Ericsson | 36.521-2 15.2.0 CR#744 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.5 |
revised | [WTS] [JSN] |
R5-184520 | Corrections to Layer 2 test cases |
CR revised to R5-185073 |
Motorola Mobility | 38.523-1 15.0.0 CR#33 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184521 | Corrections to MAC test case 7.1.2.2.1 |
CR revised to R5-185074 |
Motorola Mobility, MCC TF160 | 38.523-1 15.0.0 CR#34 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184522 | Corrections to MAC test case 7.1.2.3.1 |
CR revised to R5-185075 |
Motorola Mobility, MCC TF160 | 38.523-1 15.0.0 CR#35 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184523 | Corrections to MAC TBS test cases | CR | Motorola Mobility | 38.523-1 15.0.0 CR#36 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184524 | Addition of new MAC RACH test case for PDCCH order |
CR revised to R5-185076 |
Motorola Mobility | 38.523-1 15.0.0 CR#37 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184525 | Addition of new MAC test case for Power Headroom report |
CR revised to R5-185152 |
Motorola Mobility | 38.523-1 15.0.0 CR#38 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184526 | Addition of new MAC test case for Scell Activation Deactivation |
CR revised to R5-185077 |
Motorola Mobility | 38.523-1 15.0.0 CR#39 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184527 | Addition of new MAC test case for Reset | CR | Motorola Mobility | 38.523-1 15.0.0 CR#40 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184528 | Addition of new MAC UL TBS test case with transform precoding configured |
CR revised to R5-185078 |
Motorola Mobility | 38.523-1 15.0.0 CR#41 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184529 | WP UE Conformance Test Aspects – 5G System Non-3GPP Access | Work Plan | Motorola Mobility | 5GS_Ph1-CT_n3GPPA-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184530 | SR UE Conformance Test Aspects – 5G System Non-3GPP Access | WI status report | Motorola Mobility | 5GS_Ph1-CT_n3GPPA-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184531 | Addition of missing and new test cases applicabilities |
CR revised to R5-185162 |
Motorola Mobility | 38.523-2 15.0.0 CR#3 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.5 |
revised | [WTS] [JSN] |
R5-184532 | Correction to testcase 9.2.2.1.9 for CAT-M1 UEs |
CR revised to R5-185009 |
ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-1 15.2.0 CR#4610 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.4 |
revised | [WTS] [JSN] |
R5-184533 | PRD-17 on Guidance to Work Item Codes version 3.13 (post RAN#81 version) | other | Rapporteur (BlackBerry) |
R5-80 AI: 7.3 |
noted | [WTS] [JSN] | |||
R5-184534 | TS 36.523-1 Status before RAN5#80 | other | Rapporteur (BlackBerry) |
R5-80 AI: 6.4.6 |
noted | [WTS] [JSN] | |||
R5-184535 | TS 36.523-1 Status after RAN5#80 | other | Rapporteur (BlackBerry) |
R5-80 AI: 6.4.6 |
withdrawn | [WTS] [JSN] | |||
R5-184536 | Correction to testcases 9.2.1.2.1c and 9.2.1.2.1d applicability conditions for CAT-M1 UEs | CR | ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-2 15.2.0 CR#1196 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184537 | Proposal for Work Plans | discussion | BlackBerry |
R5-80 AI: 4.2.2 |
noted | [WTS] [JSN] | |||
R5-184538 | Correction to testcases 6.1.1.1, 6.1.1.1b and applicability conditions for CAT-M1 UEs | CR | ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-2 15.2.0 CR#1197 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.4 |
withdrawn | [WTS] [JSN] |
R5-184539 | Update of DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 | CR | SRTC | 36.521-1 15.2.0 CR#4410 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184540 | Update MU and TT of V2X test case 6.5.1G.2 Frequency error for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | CR | CAICT | 36.521-1 15.2.0 CR#4411 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-184541 | Correction to eMTC tc 6.2.2EA, UE Maximum Output Power for UE category M1 | CR | Ericsson | 36.521-1 15.2.0 CR#4412 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2 |
agreed | [WTS] [JSN] |
R5-184542 | Applicability for DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 |
CR revised to R5-185488 |
SRTC | 36.521-2 15.2.0 CR#745 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.3 |
revised | [WTS] [JSN] |
R5-184543 | Correction to CAT-M1 Test case 8.2.4.27 |
CR revised to R5-185159 |
Anritsu Ltd., Nordic Semiconductor ASA | 36.523-1 15.2.0 CR#4611 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.3.2 |
revised | [WTS] [JSN] |
R5-184544 | Update of V2X test case 6.7G.2 |
CR revised to R5-185366 |
SRTC | 36.521-1 15.2.0 CR#4413 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184545 | Addition of new TC 6.6.2.3G.2 |
CR revised to R5-185367 |
SRTC | 36.521-1 15.2.0 CR#4414 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184546 | Introduction of new V2X test case 6.5.2.1G.2 Error Vector Magnitude (EVM) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions |
CR revised to R5-185368 |
CAICT | 36.521-1 15.2.0 CR#4415 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184547 | TS 36.523-1 Status after RAN5#80 | other | Rapporteur (BlackBerry) |
R5-80 AI: 6.4.6 |
noted | [WTS] [JSN] | |||
R5-184548 | Introduction of new V2X test case 6.5.2.1G.3 Error Vector Magnitude (EVM) for V2X Communication / Intra-band contiguous multi-carrier operation |
CR revised to R5-185369 |
CAICT | 36.521-1 15.2.0 CR#4416 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184549 | Correction to V2X TC 24.1.2, 24.1.16 & 24.1.19 | CR | ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-1 15.2.0 CR#4612 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
withdrawn | [WTS] [JSN] |
R5-184550 | Draft TS 38.521-2 v0.6.0 | draft TS | CAICT | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
withdrawn | [WTS] [JSN] | |
R5-184551 | Correction to MAC test cases with TB Size selection | CR | ANRITSU LTD | 36.523-1 15.2.0 CR#4613 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.2.1 |
agreed | [WTS] [JSN] |
R5-184552 | Correction to default pre-test conditions for UM RLC test cases |
CR revised to R5-185079 |
Keysight Technologies UK Ltd | 38.523-1 15.0.0 CR#42 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184553 | Update of (NS_01/NS_17), (NS_03/NS_07), (NS_05/NS_01) and (NS_05/NS_17) TP analysis for A-MPR test case for inter-band UL CA | CR | CETECOM GmbH | 36.905 15.1.0 CR#149 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.5.4 |
agreed | [WTS] [JSN] |
R5-184554 | Correction of test points and test requirements for TC 6.2.4A.2 |
CR revised to R5-185436 |
CETECOM GmbH | 36.521-1 15.2.0 CR#4417 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-184555 | Correction of test points and test requirements for TC 6.2.4A.2_1 |
CR revised to R5-185435 |
CETECOM GmbH | 36.521-1 15.2.0 CR#4418 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-184556 | Addition of new UL 256QAM test case - A-MPR for 2UL CA intra-band contiguous |
CR revised to R5-185434 |
CETECOM GmbH | 36.521-1 15.2.0 CR#4419 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
revised | [WTS] [JSN] |
R5-184557 | Addition of new UL 256QAM test case - A-MPR for 2UL CA inter-band | CR | CETECOM GmbH | 36.521-1 15.2.0 CR#4420 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
agreed | [WTS] [JSN] |
R5-184558 | Addition of new UL 256QAM test case - Annex F | CR | CETECOM GmbH | 36.521-1 15.2.0 CR#4421 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
agreed | [WTS] [JSN] |
R5-184559 | Updates to feMTC tc 6.2.2EC UE Maximum Output Power for UE category M2 | CR | Ericsson | 36.521-1 15.2.0 CR#4422 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.2 |
agreed | [WTS] [JSN] |
R5-184560 | Introduce SA radio resource control information elements |
CR revised to R5-185038 |
Ericsson | 38.508-1 15.0.0 CR#53 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184561 | WP - UE Conformance Test Aspects - eHST |
Work Plan revised to R5-185181 |
CMCC | LTE_high_speed-UEConTest |
R5-80 AI: 7.4.2 |
revised | [WTS] [JSN] | ||
R5-184562 | SR - eHST after RAN5#80 |
WI status report revised to R5-185182 |
CMCC | LTE_high_speed-UEConTest |
R5-80 AI: 7.4.2 |
revised | [WTS] [JSN] | ||
R5-184563 | Add Clause 7.5B.1 into TS 38.521-3 |
pCR revised to R5-185503 |
CMCC | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184564 | Add Clause 7.5B.2 into TS 38.521-3 |
pCR revised to R5-185504 |
CMCC | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184565 | Add Clause 7.5B.3 into TS 38.521-3 |
pCR revised to R5-185505 |
CMCC | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184566 | Draft TS 36.579-7 v0.0.1 | draft TS | Samsung | MCImp-UEConTest | Rel-16 |
R5-80 AI: 7.5 |
withdrawn | [WTS] [JSN] | |
R5-184567 | Draft TS 38.522 v1.0.1 | draft TS | CMCC | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |
R5-184568 | OTA Chamber requirements for 5G NR Signalling test cases |
discussion revised to R5-185132 |
Keysight Technologies UK Ltd |
R5-80 AI: 6.3.13.19 |
revised | [WTS] [JSN] | |||
R5-184569 | Add Band 31 Test Frequencies for NB-IoT Inter-frequency Test cases | CR | ANRITSU LTD | 36.508 15.2.0 CR#1193 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.1 |
agreed | [WTS] [JSN] |
R5-184570 | Corrections for 5MHz Channel BW in 4.2.19, 6.x.y and 7.3.x NB-IoT Test cases | CR | ANRITSU LTD | 36.521-3 15.2.1 CR#2265 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184571 | Draft TS 36.579-6 v0.0.1 | draft TS | Samsung | MCImp-UEConTest | Rel-16 |
R5-80 AI: 7.5 |
withdrawn | [WTS] [JSN] | |
R5-184572 | General clauses updated for TS38.521-1 | pCR | Bureau Veritas | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-184573 | DL and UL RMC updated for FR1 tests |
pCR revised to R5-185390 |
Bureau Veritas | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184574 | Downlink physical channel updated for FR1 tests | pCR | Huawei, Bureau Veritas | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-184575 | OCNG Patterns updated for FR1 tests |
pCR revised to R5-185521 |
Bureau Veritas | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184576 | DL and UL RMC updated for FR2 tests |
pCR revised to R5-185188 |
Bureau Veritas | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184577 | Downlink physical channel updated for FR2 tests |
pCR revised to R5-185189 |
Bureau Veritas | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184578 | OCNG Patterns updated for FR2 tests |
pCR revised to R5-185190 |
Bureau Veritas | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184579 | Updated EN-DC configuration information in clause 5 | pCR | Bureau Veritas | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-184580 | TIB value add for EN-DC band in 38.521-3 | pCR | Bureau Veritas | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-184581 | Applicability C20 updated for intra-band contigous DL CA tests | CR | Bureau Veritas | 36.521-2 15.2.0 CR#746 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-184582 | Updated to Tested CA Configurations Selection Criteria | CR | Bureau Veritas | 36.521-2 15.2.0 CR#747 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
withdrawn | [WTS] [JSN] |
R5-184583 | Table format correct and removed redundant line for RF clause 7 test cases |
CR revised to R5-185528 |
Bureau Veritas | 36.521-2 15.2.0 CR#748 catF | TEI8_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
revised | [WTS] [JSN] |
R5-184584 | Table format correct and removed redundant line for RF clause 6 test cases | CR | Bureau Veritas | 36.521-2 15.2.0 CR#749 catF | TEI8_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-184585 | Updated test requirement to RF clause 7 test cases for CA band | CR | Bureau Veritas | 36.521-1 15.2.0 CR#4423 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184586 | Align CA information in clause 5 with TS36.101 v15.3.0 | CR | Bureau Veritas | 36.521-1 15.2.0 CR#4424 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-184587 | Addition of new R15 CA configurations to 36.521-2 | CR | Bureau Veritas | 36.521-2 15.2.0 CR#750 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.3 |
withdrawn | [WTS] [JSN] |
R5-184588 | Addition of new R15 CA configurations to 36.523-2 |
CR revised to R5-185024 |
Bureau Veritas, Ericsson | 36.523-2 15.2.0 CR#1198 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 6.3.17.3 |
revised | [WTS] [JSN] |
R5-184589 | Addition of RRM IncMon new Test Case 8.4.8 |
CR revised to R5-185457 |
Ericsson | 36.521-3 15.2.1 CR#2266 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184590 | Addition of RRM IncMon new Test Case 8.4.9 |
CR revised to R5-185458 |
Ericsson | 36.521-3 15.2.1 CR#2267 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184591 | New NAS test case 9.1.5.1.12 |
CR revised to R5-185080 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#43 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184592 | WP UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE | Work Plan | Qualcomm Europe Inc. (Spain) | LTE_eLAA-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184593 | New NAS test case 9.1.6.1.4 |
CR revised to R5-185081 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#44 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184594 | SR UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE | WI status report | Qualcomm Europe Inc. (Spain) | LTE_eLAA-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184595 | WID Update UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE | WID revised | Qualcomm Europe Inc. (Spain) | LTE_eLAA-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184596 | Correction to NB-IoT test case 22.4.20a execution guideline | CR | Anritsu Ltd, Qualcomm | 36.523-2 15.2.0 CR#1199 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.4 |
withdrawn | [WTS] [JSN] |
R5-184597 | Update IE PhysicalCellGroupConfig |
CR revised to R5-185039 |
Ericsson | 38.508-1 15.0.0 CR#54 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184598 | Introduce cell configurations and timer tolerances chapter headers |
CR revised to R5-185040 |
Ericsson | 38.508-1 15.0.0 CR#55 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184599 | Add IE SS-RSSI-Measurement | CR | Ericsson | 38.508-1 15.0.0 CR#56 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-184600 | Add IE SSB-MTC |
CR revised to R5-185041 |
Ericsson | 38.508-1 15.0.0 CR#57 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184601 | Introduction of new test case TC 6.2.5A.4 Configured UE transmitted Output Power for CA (3UL CA) |
CR revised to R5-185538 |
7LAYERS GmbH | 36.521-1 15.2.0 CR#4425 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184602 | Introduction of new test case TC 6.6.2.1A.4 Spectrum emission mask for CA (3UL CA) |
CR revised to R5-185539 |
7LAYERS GmbH | 36.521-1 15.2.0 CR#4426 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184603 | Correction to NR PDCP test case 7.1.3.5.1 |
CR revised to R5-185082 |
ANRITSU LTD | 38.523-1 15.0.0 CR#45 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184604 | Introduction of new test case TC 6.6.2.2A.4 Additional Spectrum Emission Mask for CA (3UL CA) | CR | 7LAYERS GmbH | 36.521-1 15.2.0 CR#4427 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184605 | Update of test case TC 6.6.1A.4 “Occupied bandwidth for CA (3DL CA and 3UL CA)” | CR | 7LAYERS GmbH | 36.521-1 15.2.0 CR#4428 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
withdrawn | [WTS] [JSN] |
R5-184606 | Update of test case TC 6.7A.4 "Transmit intermodulation for CA (3DL CA and 3UL CA)" |
CR revised to R5-185540 |
7LAYERS GmbH | 36.521-1 15.2.0 CR#4429 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184607 | Draft TS 36.579-6 v0.0.2 | draft TS | NIST | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.6 |
approved | [WTS] [JSN] | |
R5-184608 | Draft TS 36.579-7 v0.0.2 | draft TS | NIST | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.7 |
approved | [WTS] [JSN] | |
R5-184609 | SR - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest | WI status report | NIST | MCImp-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184610 | WP - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest.doc | Work Plan | NIST | MCImp-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184611 | New Test Case for 36.579-6 - 6.1.1.8 | pCR | NIST | 36.579-6 0.0.0 | MCImp-UEConTest | Rel-16 |
R5-80 AI: 6.3.23.6 |
withdrawn | [WTS] [JSN] |
R5-184612 | Correction to NR RLC test case 7.1.2.3.3 and 7.1.2.3.4 |
CR revised to R5-185083 |
ANRITSU LTD | 38.523-1 15.0.0 CR#46 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184613 | Addition of RRC Default Pre-test conditions for NSA |
CR revised to R5-185153 |
Qualcomm Korea | 38.523-1 15.0.0 CR#47 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184614 | Updates to EN-DC Conditions for Multi-PDN addition throughout Test Case | CR | Qualcomm Korea | 36.508 15.2.0 CR#1194 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13. |
withdrawn | [WTS] [JSN] |
R5-184615 | CR of Correct handling of DL assignment / Semi-persistent test case 7.1.1.6.1 | CR | Huawei, Hisilicon | 38.523-1 15.0.0 CR#48 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184616 | Update BWP |
CR revised to R5-185042 |
DOCOMO Communications Lab, Ericsson | 38.508-1 15.0.0 CR#58 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184617 | Update MIB | CR | DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#59 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-184618 | Update PDSCH-Config |
CR revised to R5-185043 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#60 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184619 | Update PhysicalCellGroupConfig | CR | DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#61 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
withdrawn | [WTS] [JSN] |
R5-184620 | Update PUCCH and PUSCH configuration |
CR revised to R5-185044 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#62 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184621 | Update RACH configuration |
CR revised to R5-185045 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#63 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184622 | Update SearchSpace | CR | DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#64 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
withdrawn | [WTS] [JSN] |
R5-184623 | Update CellGroupConfig |
CR revised to R5-185046 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#65 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184624 | Update CSI-MeasConfig |
CR revised to R5-185047 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#66 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184625 | Update MeasConfig |
CR revised to R5-185048 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#67 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184626 | Update other information elements |
CR revised to R5-185049 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#68 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184627 | Update PDCCH-Config | CR | DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#69 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
withdrawn | [WTS] [JSN] |
R5-184628 | Update RadioBearerConfig |
CR revised to R5-185050 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#70 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184629 | Update ServingCellConfig | CR | DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#71 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
withdrawn | [WTS] [JSN] |
R5-184630 | Editorial Update in clause 4.6.3 | CR | DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#72 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-184631 | Adding TC 13.1.21 for emergency call via CS domain | CR | DOCOMO Communications Lab. | 36.523-1 15.2.0 CR#4614 catF | TEI9_Test | Rel-15 |
R5-80 AI: 6.4.3.8 |
agreed | [WTS] [JSN] |
R5-184632 | Addition of new V2X test case 24.2.4 |
CR revised to R5-185107 |
CAICT | 36.523-1 15.2.0 CR#4615 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
revised | [WTS] [JSN] |
R5-184633 | Addition of new applicability of emergency call via CS domain TC for IMS capable UE | CR | DOCOMO Communications Lab. | 36.523-2 15.2.0 CR#1200 catF | TEI9_Test | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184634 | Correction to FR2 Spurious TC and inroduction of TRP measurement grid requirement |
pCR revised to R5-185348 |
Anritsu | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184635 | Emergency call via CS domain TC in case of IMS voice not available | discussion | DOCOMO Communications Lab. |
R5-80 AI: 6.4.6 |
noted | [WTS] [JSN] | |||
R5-184636 | Correction to V2X test case 24.1.12 |
CR revised to R5-185108 |
CAICT | 36.523-1 15.2.0 CR#4616 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
revised | [WTS] [JSN] |
R5-184637 | Addition of test applicability for new V2X TC24.2.4 and Specific ICS for V2X TC24.2.1 and TC24.2.2 | CR | CAICT | 36.523-2 15.2.0 CR#1201 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.4 |
agreed | [WTS] [JSN] |
R5-184638 | CA_1A-3A-26A(1UL) - Updates of test points analysis | CR | KDDI Corporation | 36.905 15.1.0 CR#150 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2. |
agreed | [WTS] [JSN] |
R5-184639 | CA_1A-3A-26A(1UL) –Updates of 7.3A.5 REFSENS | CR | KDDI Corporation | 36.521-1 15.2.0 CR#4430 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184640 | Introduction of Additional spurious emissions for UL 256QAM |
CR revised to R5-185406 |
TTA | 36.521-1 15.2.0 CR#4431 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
revised | [WTS] [JSN] |
R5-184641 | CA_3A-18A - Updates of test points analysis |
CR revised to R5-185543 |
KDDI Corporation | 36.905 15.1.0 CR#151 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17. |
revised | [WTS] [JSN] |
R5-184642 | CA_3A-18A - Updates of some Tx test cases |
CR revised to R5-185542 |
KDDI Corporation | 36.521-1 15.2.0 CR#4432 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
revised | [WTS] [JSN] |
R5-184643 | Addition of applicability for TC6.6.3.3_2 |
CR revised to R5-185407 |
TTA | 36.521-2 15.2.0 CR#751 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.3 |
revised | [WTS] [JSN] |
R5-184644 | Editorial: Cleaning up the style of Annex B.4.1A in TS 36.521-1 | CR | TTA | 36.521-1 15.2.0 CR#4433 catF | LTE_EBF_FDMIMO-UEConTest | Rel-15 |
R5-80 AI: 5.3.15.2 |
agreed | [WTS] [JSN] |
R5-184645 | CA_3A-18A and 1A-3A-18A - Updates of A.4.6.3 |
CR revised to R5-185486 |
KDDI Corporation | 36.521-2 15.2.0 CR#752 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.3 |
revised | [WTS] [JSN] |
R5-184646 | Introduction of FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO |
CR revised to R5-185387 |
TTA | 36.521-1 15.2.0 CR#4434 catF | LTE_EBF_FDMIMO-UEConTest | Rel-15 |
R5-80 AI: 5.3.15.2 |
revised | [WTS] [JSN] |
R5-184647 | Correction of test requirements in 7.3.5A REFSENSE | CR | KDDI Corporation | 36.521-1 15.2.0 CR#4435 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-184648 | Introduction of TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO |
CR revised to R5-185388 |
TTA | 36.521-1 15.2.0 CR#4436 catF | LTE_EBF_FDMIMO-UEConTest | Rel-15 |
R5-80 AI: 5.3.15.2 |
revised | [WTS] [JSN] |
R5-184649 | Applicabilities addition of test cases 8.3.1.1.9 and 8.3.2.1.10 |
CR revised to R5-185389 |
TTA | 36.521-2 15.2.0 CR#753 catF | LTE_EBF_FDMIMO-UEConTest | Rel-15 |
R5-80 AI: 5.3.15.3 |
revised | [WTS] [JSN] |
R5-184650 | Editorial correction of Table 7.6.3A.5.4.1-1 | CR | KDDI Corporation | 36.521-1 15.2.0 CR#4437 catF | TEI12_Test | Rel-15 |
R5-80 AI: 5.4.1.2.2 |
agreed | [WTS] [JSN] |
R5-184651 | Update of TC8.12.1.1.3 | CR | TTA | 36.521-1 15.2.0 CR#4438 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-184652 | Correction to V2X test case 24.1.1, 24.1.3, 24.1.5, 24.1.6, 24.1.10 and 24.1.11 |
CR revised to R5-185109 |
CAICT | 36.523-1 15.2.0 CR#4617 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
revised | [WTS] [JSN] |
R5-184653 | Update of Additional Maximum Power Reduction (A-MPR) for V2X Communication / Non-concurrent with E-UTRA uplink transmissions |
CR revised to R5-185356 |
LG Electronics | 36.521-1 15.2.0 CR#4439 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
revised | [WTS] [JSN] |
R5-184654 | Update to applicability V2X communication test cases for simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | CR | LG Electronics | 36.521-2 15.2.0 CR#754 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.4 |
withdrawn | [WTS] [JSN] |
R5-184655 | Update to Additional Maximum Power Reduction (A-MPR) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions |
CR revised to R5-185370 |
LG Electronics | 36.521-1 15.2.0 CR#4440 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184656 | Update to Configured UE transmitted Output Power for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmission | CR | LG Electronics | 36.521-1 15.2.0 CR#4441 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
withdrawn | [WTS] [JSN] |
R5-184657 | Update to UE Transmit OFF power for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | CR | LG Electronics. | 36.521-1 15.2.0 CR#4442 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
withdrawn | [WTS] [JSN] |
R5-184658 | Update to General ON/OFF time mask for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions |
CR revised to R5-185535 |
LG Electronics. | 36.521-1 15.2.0 CR#4443 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184659 | Draft TS 38.521-3 v0.6.0 | draft TS | Qualcomm Wireless GmbH | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
withdrawn | [WTS] [JSN] | |
R5-184660 | Update to Maximum Power Reduction (MPR) for V2X Communication / Power class 3 / Contiguous allocation of PSCCH and PSSCH / Non-concurrent with E-UTRA uplink transmissions | CR | LG Electronics. | 36.521-1 15.2.0 CR#4444 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-184661 | Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of NR cells / EN-DC |
CR revised to R5-185089 |
Intertek | 38.523-1 15.0.0 CR#49 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184662 | Update to Annex G for V2V/V2X Demod Perf tests |
CR revised to R5-185357 |
Qualcomm Wireless GmbH | 36.521-1 15.2.0 CR#4445 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
revised | [WTS] [JSN] |
R5-184663 | Corrections to MCPTT Authorization |
CR revised to R5-185122 |
MCC TF160 | 36.579-1 13.1.0 CR#7 catF | TEI13_Test, MCPTT-ConTest | Rel-13 |
R5-80 AI: 6.5.9.1 |
revised | [WTS] [JSN] |
R5-184664 | Default channel bandwidth of new NR bands for non-CA signaling test cases |
discussion revised to R5-185027 |
DOCOMO Communications Lab., KDDI Corporation, KT Corp. |
R5-80 AI: 6.3.13.19 |
revised | [WTS] [JSN] | |||
R5-184665 | Flexible loop nest for FR2 TRx tests | pCR | Anritsu | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
withdrawn | [WTS] [JSN] |
R5-184666 | MCPTT Client test cases: open issues in prose | discussion | MCC TF160 |
R5-80 AI: 6.5.9.14 |
noted | [WTS] [JSN] | |||
R5-184667 | Correction to LAA inter-frequency event-triggered reporting test cases | CR | Qualcomm Wireless GmbH | 36.521-3 15.2.1 CR#2268 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184668 | Editorial correction of reference document | CR | Intertek | 36.508 15.2.0 CR#1195 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.1 |
agreed | [WTS] [JSN] |
R5-184669 | Clarification on frame structure in 4Rx performance and CSI test principles sections |
CR revised to R5-185530 |
Qualcomm Wireless GmbH | 36.521-1 15.2.0 CR#4446 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2 |
revised | [WTS] [JSN] |
R5-184670 | CR of AM RLC test case 7.1.2.3.10 |
CR revised to R5-185090 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#50 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184671 | Update of References in Section 2 of 38.521-3 spec | pCR | Qualcomm Wireless GmbH | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-184672 | Updates to Operating Bands in Section 5.2 | pCR | Qualcomm Wireless GmbH | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-184673 | Editorial updates to 38.509 |
CR revised to R5-185057 |
Samsung, MCC TF160 | 38.509 15.0.0 CR#1 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.3 |
revised | [WTS] [JSN] |
R5-184674 | Specifying content for SCGFailureInformationNR |
CR revised to R5-185103 |
Samsung | 36.508 15.2.0 CR#1196 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13. |
revised | [WTS] [JSN] |
R5-184675 | Specifying content for MeasResultSCG-Failure |
CR revised to R5-185051 |
Samsung | 38.508-1 15.0.0 CR#73 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184676 | Update of RRC SCG failure TC 8.2.5.1.1 |
CR revised to R5-185091 |
Samsung, Qualcomm | 38.523-1 15.0.0 CR#51 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184677 | Update of RRC SCG failure TC 8.2.5.2.1 |
CR revised to R5-185092 |
Samsung, Qualcomm | 38.523-1 15.0.0 CR#52 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184678 | Update of RRC SCG failure TC 8.2.5.3.1 |
CR revised to R5-185093 |
Samsung, Qualcomm | 38.523-1 15.0.0 CR#53 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184679 | Update of RRC SCG failure TC 8.2.5.4.1 |
CR revised to R5-185094 |
Samsung, Qualcomm | 38.523-1 15.0.0 CR#54 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184680 | Update of RRC SCG failure TC 8.2.5.5.1 | CR | Samsung, Qualcomm | 38.523-1 15.0.0 CR#55 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184681 | Update of RRC SCG failure TC 8.2.5.6.1 | CR | Samsung, Qualcomm | 38.523-1 15.0.0 CR#56 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184682 | Update of test case title for TC 8.2.5.1.1 | CR | Samsung | 38.523-2 15.0.0 CR#4 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.5 |
agreed | [WTS] [JSN] |
R5-184683 | 5G work planning after RAN5#80 | other | Samsung | 5GS_NR_LTE-UEConTest |
R5-80 AI: 7.5 |
withdrawn | [WTS] [JSN] | ||
R5-184684 | Update of PRD13 | other | Samsung |
R5-80 AI: 7.3 |
approved | [WTS] [JSN] | |||
R5-184685 | Update of default message contents for new Rel-14 TCs for Private Call Call-Back and Ambient listening call | CR | Samsung | 36.579-1 13.1.0 CR#8 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.1 |
agreed | [WTS] [JSN] |
R5-184686 | Adding a new Rel-14 TC on Private Call Call-Back Request / Client Originated (CO) / Private call call-back fulfilment |
CR revised to R5-185123 |
Samsung | 36.579-2 13.1.0 CR#10 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.2 |
revised | [WTS] [JSN] |
R5-184687 | Adding a new Rel-14 TC on Private Call Call-Back Request / Client Terminated (CT) / Private call call-back fulfilment | CR | Samsung | 36.579-2 13.1.0 CR#11 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.2 |
agreed | [WTS] [JSN] |
R5-184688 | Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Originated (CO) |
CR revised to R5-185124 |
Samsung | 36.579-2 13.1.0 CR#12 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.2 |
revised | [WTS] [JSN] |
R5-184689 | Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Terminated (CT) | CR | Samsung | 36.579-2 13.1.0 CR#13 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.2 |
agreed | [WTS] [JSN] |
R5-184690 | Adding a new Rel-14 TC on Private Call / Locally initiated Ambient listening call / Client Originated (CO) | CR | Samsung | 36.579-2 13.1.0 CR#14 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.2 |
agreed | [WTS] [JSN] |
R5-184691 | Adding a new Rel-14 TC on Private Call / Locally initiated Ambient listening call / Client Terminated (CT) | CR | Samsung | 36.579-2 13.1.0 CR#15 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.2 |
agreed | [WTS] [JSN] |
R5-184692 | Editorial updates to 36.579-2 Rel-13 TCs | CR | Samsung | 36.579-2 13.1.0 CR#16 catF | TEI13_Test, MCPTT-ConTest | Rel-13 |
R5-80 AI: 6.5.9.2 |
agreed | [WTS] [JSN] |
R5-184693 | Adding applicability for new MCPTT Rel-14 TCs | CR | Samsung | 36.579-4 13.1.0 CR#2 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.4 |
agreed | [WTS] [JSN] |
R5-184694 | eLAA: Updates to Adjacent Channel Leakage power Ratio for CA |
CR revised to R5-185433 |
Qualcomm Europe Inc. (Spain) | 36.521-1 15.2.0 CR#4447 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 5.3.7.2 |
revised | [WTS] [JSN] |
R5-184695 | Resubmission of update of TC8.13.3.6.1 and 8.13.3.6.2 | CR | ETSI MCC (TTA) | 36.521-1 15.2.0 CR#4448 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.2 |
agreed | [WTS] [JSN] |
R5-184696 | EN-DC Test Model: Addition of further aspects | CR | MCC TF160 | 38.523-3 15.0.0 CR#3 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.6 |
agreed | [WTS] [JSN] |
R5-184697 | New UL 256QAM test case: 6.6.2.2_2 Additional Spectrum Emission Mask for UL 256QAM |
CR revised to R5-185427 |
Ericsson | 36.521-1 15.2.0 CR#4449 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
revised | [WTS] [JSN] |
R5-184698 | Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 | CR | Ericsson | 36.521-1 15.2.0 CR#4450 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.3 |
withdrawn | [WTS] [JSN] |
R5-184699 | Addition of PICS |
CR revised to R5-185161 |
Motorola Mobility | 38.508-2 15.0.0 CR#1 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.2 |
revised | [WTS] [JSN] |
R5-184700 | Addition of Test Loop for SDAP testing |
CR revised to R5-185058 |
Motorola Mobility | 38.509 15.0.0 CR#2 catB | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.3 |
revised | [WTS] [JSN] |
R5-184701 | Addition of RLC Config for UM | CR | Motorola Mobility | 38.508-1 15.0.0 CR#74 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
withdrawn | [WTS] [JSN] |
R5-184702 | Addition of 5GS NR SDAP test case 7.1.4.2 |
CR revised to R5-185095 |
Motorola Mobility | 38.523-1 15.0.0 CR#57 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184703 | MU budget for EIRP/TRP measurements with Near Field test range at mmWave | discussion | MVG Industries | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
withdrawn | [WTS] [JSN] | |
R5-184704 | Update to IMS eCall test cases for eCall category bit usage | CR | Qualcomm Incorporated | 34.229-1 14.3.0 CR#1292 catF | TEI14_Test, EIEI-UEConTest | Rel-14 |
R5-80 AI: 6.5.6.1 |
agreed | [WTS] [JSN] |
R5-184705 | Update to Emergency Call test case 19.1.3 for eCall category bit usage |
CR revised to R5-185087 |
Qualcomm Incorporated | 34.229-1 14.3.0 CR#1293 catF | TEI9_Test | Rel-14 |
R5-80 AI: 6.5.6.1 |
revised | [WTS] [JSN] |
R5-184706 | Editorial correction to band representation of non-contiguous EN-DC band combination |
CR revised to R5-185052 |
Keysight Technologies UK Ltd | 38.508-1 15.0.0 CR#75 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184707 | Update of EMM test case 9.2.1.1.1b | CR | Qualcomm Incorporated | 36.523-1 15.2.0 CR#4618 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.4 |
agreed | [WTS] [JSN] |
R5-184708 | Update of EMM test case 9.2.1.1.22 | CR | Qualcomm Incorporated, Anritsu | 36.523-1 15.2.0 CR#4619 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.4 |
agreed | [WTS] [JSN] |
R5-184709 | Update of EMM test case 9.2.3.2.17 |
CR revised to R5-185010 |
Qualcomm Incorporated | 36.523-1 15.2.0 CR#4620 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.4 |
revised | [WTS] [JSN] |
R5-184710 | Update of eMBMS test cases for UEs supporting AT command for eMBMS service activation | CR | Qualcomm Incorporated | 36.523-1 15.2.0 CR#4621 catF | TEI9_Test | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-184711 | Update to NB-IOT test case 22.1.1 M2 |
CR revised to R5-185019 |
Qualcomm Incorporated, Anritsu, Rohde & Schwarz | 36.523-1 15.2.0 CR#4622 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
revised | [WTS] [JSN] |
R5-184712 | Update to NB-IOT test case 22.3.1.2 |
CR revised to R5-185020 |
Qualcomm Incorporated | 36.523-1 15.2.0 CR#4623 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
revised | [WTS] [JSN] |
R5-184713 | Correction to RLC-Config IE |
CR revised to R5-185053 |
Ericsson | 38.508-1 15.0.0 CR#76 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184714 | Correction to RadioBearerConfig-DRB |
CR revised to R5-185054 |
Ericsson | 38.508-1 15.0.0 CR#77 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184715 | Corrections ard updates to BandCombinationList and Feature Set IEs |
CR revised to R5-185055 |
Ericsson | 38.508-1 15.0.0 CR#78 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184716 | Addition of RRM IncMon new Test Case 8.5.8 |
CR revised to R5-185459 |
Ericsson | 36.521-3 15.2.1 CR#2269 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184717 | Addition of RRM IncMon new Test Case 8.6.3 |
CR revised to R5-185460 |
Ericsson | 36.521-3 15.2.1 CR#2270 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184718 | Addition of RRM IncMon new Test Case 8.7.5 |
CR revised to R5-185461 |
Ericsson | 36.521-3 15.2.1 CR#2271 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184719 | Addition of RRM IncMon new Test Case 8.7A.1 |
CR revised to R5-185462 |
Ericsson | 36.521-3 15.2.1 CR#2272 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184720 | Addition of RRM IncMon new Test Cases 4.2.1 and 4.2.11 |
CR revised to R5-185463 |
Ericsson | 36.521-3 15.2.1 CR#2273 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184721 | Addition of RRM IncMon new Test Case 4.3.1.5 |
CR revised to R5-185464 |
Ericsson | 36.521-3 15.2.1 CR#2274 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184722 | Addition of RRM IncMon new Test Case 4.3.2A |
CR revised to R5-185465 |
Ericsson | 36.521-3 15.2.1 CR#2275 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184723 | Addition of RRM IncMon new Test Case 4.3.3A |
CR revised to R5-185466 |
Ericsson | 36.521-3 15.2.1 CR#2276 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184724 | Addition of RRM IncMon new Test Case 4.3.4.4 |
CR revised to R5-185467 |
Ericsson | 36.521-3 15.2.1 CR#2277 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
revised | [WTS] [JSN] |
R5-184725 | Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 |
CR revised to R5-185428 |
Ericsson | 36.521-2 15.2.0 CR#755 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.3 |
revised | [WTS] [JSN] |
R5-184726 | Removal of 1xPre-Registation 8.4.7.x test cases | CR | Qualcomm Incorporated | 36.523-1 15.2.0 CR#4624 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.3.4 |
agreed | [WTS] [JSN] |
R5-184727 | Removal of Multi-Layer 1xPre-Registation 13.4.4.x and 1xCSFB 13.1.xx test cases | CR | Qualcomm Incorporated | 36.523-1 15.2.0 CR#4625 catF | TEI9_Test | Rel-15 |
R5-80 AI: 6.4.3.8 |
agreed | [WTS] [JSN] |
R5-184728 | Update of TC7.6.2G.1 Out-of-band blocking for V2X Communication | CR | CAICT | 36.521-1 15.2.0 CR#4451 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-184729 | Update of TC 7.8.1G.1 Wide band Intermodulation for V2X | CR | CAICT | 36.521-1 15.2.0 CR#4452 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-184730 | Correction to Inter-RAT absolute priority based reselection test cases | CR | Qualcomm Incorporated | 36.523-2 15.2.0 CR#1202 catF | TEI11_Test | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184731 | Update to applicability condition of test case 11.2.3 to include CSG PICS | CR | Qualcomm Incorporated | 36.523-2 15.2.0 CR#1203 catF | TEI9_Test | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184732 | Update to applicability condition of Intra-frequency measurement reporting test cases for CAT-M1 UEs |
CR revised to R5-185137 |
Qualcomm Incorporated | 36.523-2 15.2.0 CR#1204 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.4 |
revised | [WTS] [JSN] |
R5-184733 | Update of TC7.9G Spurious emissions for V2X | CR | CAICT | 36.521-1 15.2.0 CR#4453 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-184734 | Update to applicability condition of Test case 6.1.1.7a for CAT-M1 UEs | CR | Qualcomm Incorporated, Rohde & Schwarz | 36.523-2 15.2.0 CR#1205 catF | TEI10_Test | Rel-15 |
R5-80 AI: 6.4.4 |
withdrawn | [WTS] [JSN] |
R5-184735 | Removal of 1xPre-Registation and 1xCSFB test cases applicability |
CR revised to R5-185138 |
Qualcomm Incorporated | 36.523-2 15.2.0 CR#1206 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.4 |
revised | [WTS] [JSN] |
R5-184736 | Introduce Intra frequency handover for Cat-M2 UEs in CEModeA | CR | Bureau Veritas | 36.521-3 15.2.1 CR#2278 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.4 |
withdrawn | [WTS] [JSN] |
R5-184737 | Dual uplink interferer updated to 38.521-3 | pCR | Bureau Veritas | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-184738 | pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave |
pCR revised to R5-185352 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
revised | [WTS] [JSN] |
R5-184739 | Update of UE test loop mode E |
CR revised to R5-185129 |
Huawei,HiSilicon, CATT | 36.509 15.0.0 CR#196 catA | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 4.5.1 |
revised | [WTS] [JSN] |
R5-184740 | Update of multiple V2V RF test cases for proper test mode setting |
CR revised to R5-185358 |
Huawei,HiSilicon | 36.521-1 15.2.0 CR#4454 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
revised | [WTS] [JSN] |
R5-184741 | Discussion on starting point of 200ms in FR1 RF test procedures |
discussion revised to R5-185306 |
Huawei,HiSilicon, Keysight | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184742 | Update of FR2 test case 6.3.1 | pCR | Huawei,HiSilicon | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-184743 | Update of FR2 test case 6.3.3.2 | pCR | Huawei,HiSilicon | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-184744 | Addition of 6.2B.4.1.1 Configured OP for Intra-Band Contiguous EN-DC |
pCR revised to R5-185332 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184745 | Addition of 6.2B.4.1.2 Configured OP for Intra-Band Non-Contiguous EN-DC |
pCR revised to R5-185333 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184746 | Addition of 6.2B.4.1.3 Configured OP for Intre-Band within FR1 |
pCR revised to R5-185507 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184747 | Addition of 6.2B.4.1.4 Configured OP for Inter-Band EN-DC including FR2 |
pCR revised to R5-185198 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184748 | Addition of 6.2B.4.1.5 Configured OP for Inter-Band EN-DC including both FR1 and FR2 |
pCR revised to R5-185199 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184749 | Revised WID- Support for V2X services | WID revised | Huawei | LTE_V2X-UEConTest | Rel-14 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184750 | Draft TR 38.905-1 v0.3.0 | draft TR | Ericsson LM | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
withdrawn | [WTS] [JSN] | |
R5-184751 | TP for updating TR38.905 with FR1 AMPR test point analyses with NS_35 |
pCR revised to R5-185307 |
Ericsson LM | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-184752 | Discussion on test point selection for NS_35 A-MPR in FR1 | discussion | Ericsson LM |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |||
R5-184753 | Update of NR test cases title and applicability |
CR revised to R5-185157 |
Qualcomm Incorporated | 38.523-2 15.0.0 CR#5 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.5 |
revised | [WTS] [JSN] |
R5-184754 | TP for updating test case 6.2.3 UE AMPR |
pCR revised to R5-185408 |
Ericsson LM | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184755 | TP for updating test case 6.5.2.3 Additional spectrum emission mask | pCR | Ericsson LM | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184756 | Correction to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC |
CR revised to R5-185154 |
Qualcomm Incorporated | 38.523-1 15.0.0 CR#58 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184757 | TP for updating test case 6.2B.3.1 UE AMPR for Intra-band contigous EN-DC |
pCR revised to R5-185469 |
Ericsson LM | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184758 | TP for updating test case 6.2B.3.2 UE AMPR for Intra-band non-contigous EN-DC |
pCR revised to R5-185470 |
Ericsson LM | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184759 | TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC |
pCR revised to R5-185471 |
Ericsson LM | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184760 | Correction to RRC TC - PSCell addition, modification and release / Split DRB / EN-DC | CR | Qualcomm Incorporated | 38.523-1 15.0.0 CR#59 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184761 | Correction to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of NR cells / EN-DC | CR | Qualcomm Incorporated | 38.523-1 15.0.0 CR#60 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184762 | Aligning CA delta TiB in sub-clause 6.2.5.3 with TS 36.101 v15.3.0 | CR | Ericsson LM | 36.521-1 15.2.0 CR#4455 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-184763 | Correction to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / RSRQ based measurements / EN-DC | CR | Qualcomm Incorporated | 38.523-1 15.0.0 CR#61 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184764 | Aligning CA delta RiB in sub-clause 7.3.3 with TS 36.101 v15.3.0 | CR | Ericsson LM | 36.521-1 15.2.0 CR#4456 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-184765 | Introduction CA_3A-7A-20A-32A 4DL/1UL to Annex A | CR | Ericsson LM | 36.521-2 15.2.0 CR#756 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.3 |
withdrawn | [WTS] [JSN] |
R5-184766 | Optimization of test configuration table for Rx CA test cases |
discussion revised to R5-185513 |
NTT DOCOMO, INC. | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.11 |
revised | [WTS] [JSN] | |
R5-184767 | Updates to NAS test case 10.2.1.2 |
CR revised to R5-185155 |
Ericsson LM | 38.523-1 15.0.0 CR#62 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184768 | Update of 5GS NR RRC test case 8.2.2.6.1 | CR | ROHDE & SCHWARZ | 38.523-3 15.0.0 CR#4 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184769 | Update of 5GS NR RRC test case 8.2.2.6.1 | CR | ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#63 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-184770 | Update of 5GS NR RRC test case 8.2.3.6.1 |
CR revised to R5-185096 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#64 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184771 | Addition of test frequencies for CA_66A-71A, CA_66C-71A, CA_70A-71A, CA_70C-71A to 36.508 | CR | WE Certification Oy, DISH Network | 36.508 15.2.0 CR#1197 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-184772 | Addition of new 5GC TC 9.1.2.2 | CR | CATT, TDIA | 38.523-1 15.0.0 CR#65 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184773 | RF TP analysis for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A | CR | WE Certification Oy, DISH Network | 36.905 15.1.0 CR#152 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17. |
agreed | [WTS] [JSN] |
R5-184774 | Update of 5GS NR RRC test case 8.2.3.8.1 |
CR revised to R5-185097 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#66 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184775 | Reference sensitivity requirements for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A |
CR revised to R5-185174 |
WE Certification Oy, DISH Network | 36.521-1 15.2.0 CR#4457 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
revised | [WTS] [JSN] |
R5-184776 | Updates to Align Initial Conditions with Other V2X Test Cases |
CR revised to R5-185371 |
PCTEST Engineering Lab | 36.521-1 15.2.0 CR#4458 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184777 | Update of 5GS NR RRC test case 8.2.1.1.1 |
CR revised to R5-185098 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#67 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184778 | Updates to Align the GNSS Moving Scenario Details with Other V2X Test Cases | CR | PCTEST Engineering Lab | 36.523-1 15.2.0 CR#4626 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-184779 | Update to A.2.1 for Test eCall Request-URI | CR | Qualcomm Incorporated | 34.229-1 14.3.0 CR#1294 catF | TEI14_Test, EIEI-UEConTest | Rel-14 |
R5-80 AI: 6.5.6.1 |
withdrawn | [WTS] [JSN] |
R5-184780 | Update of applicability and tests conditions for NB_IOT enhancement test cases | CR | CATT, TDIA, Starpoint | 36.523-2 15.2.0 CR#1207 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.4 |
agreed | [WTS] [JSN] |
R5-184781 | Update to IMS eCall test case 11.3.2 | CR | Qualcomm Incorporated | 36.523-1 15.2.0 CR#4627 catF | TEI14_Test, EIEI-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.6 |
withdrawn | [WTS] [JSN] |
R5-184782 | Update to IMS eCall test case 11.3.6 | CR | Qualcomm Incorporated | 36.523-1 15.2.0 CR#4628 catF | TEI14_Test, EIEI-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.6 |
withdrawn | [WTS] [JSN] |
R5-184783 | Introduce 5GMM messages | CR | Ericsson | 38.508-1 15.0.0 CR#79 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-184784 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.8 |
CR revised to R5-185116 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#4629 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-184785 | Introduce 5GSM messages | CR | Ericsson | 38.508-1 15.0.0 CR#80 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-184786 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.9 | CR | CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#4630 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-184787 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.10 |
CR revised to R5-185117 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#4631 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-184788 | Addition of new NB_IOTenh-UEConTest test case 22.4.24 |
CR revised to R5-185118 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#4632 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-184789 | Addition of new NB_IOTenh-UEConTest test case 22.4.25 |
CR revised to R5-185119 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#4633 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-184790 | Addition of new NB_IOTenh-UEConTest test case 22.4.25 | CR | CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#4634 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
withdrawn | [WTS] [JSN] |
R5-184791 | Addition of NB_IOTenh-UEConTest test case scenarios and default SIB content |
CR revised to R5-185113 |
CATT, TDIA, Starpoint | 36.508 15.2.0 CR#1198 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.1 |
revised | [WTS] [JSN] |
R5-184792 | Addition of reference dedicated EPS bearer context #7 for V2X testing | CR | CATT | 36.523-1 15.2.0 CR#4635 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
withdrawn | [WTS] [JSN] |
R5-184793 | Remove test step 0 in test case 24.1.15 | CR | CATT | 36.523-1 15.2.0 CR#4636 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-184794 | Remove test step 0 in test case 24.1.18 | CR | CATT | 36.523-1 15.2.0 CR#4637 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-184795 | Correction on V2X Sidelink test case 24.3.1 | CR | CATT | 36.523-1 15.2.0 CR#4638 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-184796 | Update Table 24.3.3.3.3-1 in test case 24.3.3 | CR | CATT | 36.523-1 15.2.0 CR#4639 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-184797 | Clarification for chapter 8 & 9 general sections | CR | Rohde & Schwarz | 36.521-1 15.2.0 CR#4459 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
agreed | [WTS] [JSN] |
R5-184798 | Corrections to 4Rx demodulation TCs | CR | Rohde & Schwarz | 36.521-1 15.2.0 CR#4460 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.2 |
withdrawn | [WTS] [JSN] |
R5-184799 | Corrections to A-MPR values for NS_27 |
CR revised to R5-185448 |
Rohde & Schwarz | 36.521-1 15.2.0 CR#4461 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-184800 | Update to test point analysis for NS_27 | CR | Rohde & Schwarz | 36.905 15.1.0 CR#153 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.5.4 |
agreed | [WTS] [JSN] |
R5-184801 | Discussion on UE device size for FR2 | discussion | Rohde & Schwarz | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-184802 | Discussion on treatment of multi-panel UEs | discussion | Rohde & Schwarz | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-184803 | Discussion on Test Tolerance for FR2 |
discussion revised to R5-185534 |
Intel Corporation (UK) Ltd, Apple Inc. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184804 | Discussion on TT for Max Output Power TC Requirements for FR2 |
discussion revised to R5-185566 |
Intel Corporation (UK) Ltd, Apple Inc. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184805 | Discussion on SIG testcase optimization of 5GC | discussion | CATT |
R5-80 AI: 6.3.13.19 |
noted | [WTS] [JSN] | |||
R5-184806 | Mid test CH BW for n71 | CR | Dish Network | 38.508-1 15.0.0 CR#81 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-184807 | Correction to NB-IoT testcase 22.3.3.5 |
CR revised to R5-185021 |
ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#4641 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
revised | [WTS] [JSN] |
R5-184808 | Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2 |
CR revised to R5-185549 |
Intel Corporation (UK) Ltd | 36.521-2 15.2.0 CR#757 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
revised | [WTS] [JSN] |
R5-184809 | Correction to Applicability Condition of TS 36.521-1 Test Cases 6.6.2.2A.1 and 6.6.3.3A.1 | CR | Intel Corporation (UK) Ltd | 36.521-2 15.2.0 CR#758 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-184810 | FR2_UE_BeamlockInvoke_38.521-3 |
pCR revised to R5-185556 |
Qualcomm Europe Inc. (Spain) | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184811 | Correction to Note 1 of Table 7.3A.0-0bB Reference sensitivity level for CA | CR | Intel Corporation (UK) Ltd | 36.521-1 15.2.0 CR#4462 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.2.2 |
agreed | [WTS] [JSN] |
R5-184812 | Correction to Power Control for CA Test Procedure of TCs 6.3.5A.1.1, 6.3.5A.1.2 and 6.3.5A.1.4 | CR | Intel Corporation (UK) Ltd | 36.521-1 15.2.0 CR#4463 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184813 | New test case for V2X Sidelink using Tx parameters based on measured CBR and PPPP |
CR revised to R5-185110 |
Sporton, TTA | 36.523-1 15.2.0 CR#4642 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
revised | [WTS] [JSN] |
R5-184814 | Addition of test applicability for new V2X TC 24.1.13 | CR | Sporton | 36.523-2 15.2.0 CR#1208 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.4 |
agreed | [WTS] [JSN] |
R5-184815 | New test case for NB-IoT UM RLC |
CR revised to R5-185120 |
Sporton, TTA, TDIA | 36.523-1 15.2.0 CR#4643 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
revised | [WTS] [JSN] |
R5-184816 | Addition of applicability and tests conditions for new Enhancements NB-IoT TC 24.1.13 | CR | Sporton | 36.523-2 15.2.0 CR#1209 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.4 |
withdrawn | [WTS] [JSN] |
R5-184817 | Making Measurement Uncertainty Terms Common between methods in TR 38.90 | discussion | MVG Industries | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
withdrawn | [WTS] [JSN] | |
R5-184818 | Correction to Message Content for TC 6.2.4EA A-MPR for UE Category M1 | CR | Intel Corporation (UK) Ltd | 36.521-1 15.2.0 CR#4464 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184819 | pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 |
pCR revised to R5-185213 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
revised | [WTS] [JSN] |
R5-184820 | Addition of default laa-SCellConfiguration setting for eLAA | CR | Huawei, MCC TF160 | 36.508 15.2.0 CR#1199 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 6.3.7.1 |
agreed | [WTS] [JSN] |
R5-184821 | Inter-band con-current V2X configurations- Updates of test points analysis | CR | Huawei, Hisilicon | 36.905 15.1.0 CR#154 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.8 |
agreed | [WTS] [JSN] |
R5-184822 | Addition of notes for half pi-BPSK test applicability | pCR | Huawei, Hisilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-184823 | Introduction of 6.2C.1 Configured transmitted power for SUL |
pCR revised to R5-185446 |
Huawei, Hisilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184824 | Addition of Uplink Physical Channels in Annex |
pCR revised to R5-185324 |
Huawei, Hisilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184825 | Addition of downlink physicanl channels in annex | pCR | Huawei, Hisilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184826 | Update of TC 6.2B.1.1 |
pCR revised to R5-185472 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184827 | Introduction of TC 6.2B.1.2 |
pCR revised to R5-185473 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184828 | Update of 6.2B.1.3 |
pCR revised to R5-185474 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184829 | Introduction of TC 7.4B.1 |
pCR revised to R5-185475 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184830 | Introduction of 7.4B.2 |
pCR revised to R5-185476 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184831 | Introduction of 7.4B.3 |
pCR revised to R5-185477 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184832 | Addition of Test point and test requirements for CA_3A-41A, 41A-42A,3A-42A spurious test cases | CR | Huawei, Hisilicon | 36.521-1 15.2.0 CR#4465 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184833 | Test point and test requirements analysis for CA_3A-41A, 41A-42A,3A-42A spurious test cases |
CR revised to R5-185437 |
Huawei, Hisilicon | 36.905 15.1.0 CR#155 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2. |
revised | [WTS] [JSN] |
R5-184834 | Discussion on the test applicability for the modulation of Pi/2-BPSK |
discussion revised to R5-185308 |
Huawei, Hisilicon | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184835 | Discussion on test point selection for Configured transmitted power for SUL test case in FR1 | discussion | Huawei, Hisilicon | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184836 | Correction to Reference sensitivity level for CA UL Allocation in Table 7.3A.1.4.1-1 | CR | Intel Corporation (UK) Ltd | 36.521-1 15.2.0 CR#4466 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.2.2 |
withdrawn | [WTS] [JSN] |
R5-184837 | Test Point analysis for FR1 Configured Output Power for SUL |
pCR revised to R5-185309 |
Huawei,HiSilicon | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-184838 | Addition of new CA band combination – Updates of test points analysis |
CR revised to R5-185502 |
SGS Wireless | 36.905 15.1.0 CR#156 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17. |
revised | [WTS] [JSN] |
R5-184839 | Update of TDD PDSCH Closed Loop Multi Layer Multiplexing 4x2 for CA (5DL CA) | CR | SGS Wireless | 36.521-1 15.2.0 CR#4467 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
R5-184840 | Update of TX Minimum Ouput Power for CA (3UL CA) | CR | SGS Wireless | 36.521-1 15.2.0 CR#4468 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184841 | Introduction of Additional Maximum Power Reduction (A-MPR) for CA (3UL CA) |
CR revised to R5-185508 |
SGS Wireless | 36.521-1 15.2.0 CR#4469 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184842 | Introduction of Maximum Power Reduction (MPR) for CA (3UL CA) | CR | SGS Wireless | 36.521-1 15.2.0 CR#4470 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-184843 | Introduction of General ON/OFF time mask for CA (3UL CA) |
CR revised to R5-185509 |
SGS Wireless | 36.521-1 15.2.0 CR#4471 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184844 | Addition of new 2CA band combination for CA REFSENS | CR | SGS Wireless | 36.521-1 15.2.0 CR#4472 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-184845 | Addition of new 3CA band combination for CA REFSENS |
CR revised to R5-185506 |
SGS Wireless | 36.521-1 15.2.0 CR#4473 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
revised | [WTS] [JSN] |
R5-184846 | Additional of test applicability for CA (3UL CA) | CR | SGS Wireless | 36.521-2 15.2.0 CR#759 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.3 |
withdrawn | [WTS] [JSN] |
R5-184847 | Update of V2X RRM |
CR revised to R5-185373 |
SGS Wireless | 36.521-3 15.2.1 CR#2279 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
revised | [WTS] [JSN] |
R5-184848 | Update of V2X Receiver Test Cases |
CR revised to R5-185372 |
SGS Wireless | 36.521-1 15.2.0 CR#4474 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
revised | [WTS] [JSN] |
R5-184849 | Correction of condition for Measurement configuration and reporting | CR | SGS Wireless, Ericsson | 36.523-2 15.2.0 CR#1210 catF | TEI9_Test | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-184850 | Update of Initial condition for FR2 | pCR | SGS Wireless | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
withdrawn | [WTS] [JSN] |
R5-184851 | Introduction of OTA signaling test environment |
CR revised to R5-185168 |
Keysight Technologies UK Ltd, Anritsu Ltd | 38.508-1 15.0.0 CR#82 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184852 | Discussion on OBW, SEM and ACLR for EN-DC interband FR1 |
discussion revised to R5-185478 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-184853 | Correction to NR RRC test case 8.2.3.14.1 | CR | Keysight Technologies UK Ltd | 38.508-1 15.0.0 CR#83 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184854 | Correction to NB-IoT testcase 22.3.2.2 | CR | ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#4644 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-184855 | Update Occupied Bandwidth for interband EN-DC within FR1 |
pCR revised to R5-185479 |
Keysight Technologies UK Ltd | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184856 | General sections updated to 38.521-2 | pCR | CAICT | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-184857 | Update SEM interband EN-DC within FR1 |
pCR revised to R5-185480 |
Keysight Technologies UK Ltd | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184858 | Quality of Quiet Zone Results for IFF |
other revised to R5-185492 |
Keysight Technologies UK Ltd |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |||
R5-184859 | 5G_NR FR1_Text_update for_RX_sensitivity |
pCR revised to R5-185447 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184860 | Update ACLR for interband EN-DC within FR1 |
pCR revised to R5-185481 |
Keysight Technologies UK Ltd | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184861 | WP – UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE | Work Plan | Intel Corporation (UK) Ltd | LTE_IM_DLCCH-UEConTest | Rel-13 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184862 | SR- UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE | WI status report | Intel Corporation (UK) Ltd | LTE_IM_DLCCH-UEConTest | Rel-13 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184863 | Update of FR1 test case 6.2.2 |
pCR revised to R5-185411 |
CAICT | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184864 | WP – UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Enhancements | Work Plan | Intel Corporation (UK) Ltd | LTE_WLAN_radio-UEConTest | Rel-13 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184865 | 5G NR_FR1_Text_update for TX Spurious Emission |
pCR revised to R5-185413 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184866 | SR- UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Enhancements | WI status report | Intel Corporation (UK) Ltd | LTE_WLAN_radio-UEConTest | Rel-13 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184867 | 5G NR_FR1_Text_update for TX Spurious Emission UE-Co-exist |
pCR revised to R5-185496 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184868 | New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes |
CR revised to R5-185544 |
Intel Corporation (UK) Ltd | 36.521-3 15.2.1 CR#2280 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
revised | [WTS] [JSN] |
R5-184869 | 5G NR_EN_DC with FR1_Text update for RX sensitivity |
pCR revised to R5-185482 |
Qualcomm Incorporated | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184870 | New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes |
CR revised to R5-185545 |
Intel Corporation (UK) Ltd | 36.521-3 15.2.1 CR#2281 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
revised | [WTS] [JSN] |
R5-184871 | New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes |
CR revised to R5-185546 |
Intel Corporation (UK) Ltd | 36.521-3 15.2.1 CR#2282 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
revised | [WTS] [JSN] |
R5-184872 | 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission |
pCR revised to R5-185487 |
Qualcomm Incorporated | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184873 | New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes |
CR revised to R5-185547 |
Intel Corporation (UK) Ltd | 36.521-3 15.2.1 CR#2283 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
revised | [WTS] [JSN] |
R5-184874 | TS 36.521-1 Annex F update for UE cat 1bis test cases |
CR revised to R5-185377 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#4475 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
revised | [WTS] [JSN] |
R5-184875 | Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-1 |
pCR revised to R5-185414 |
Keysight Technologies UK Ltd | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184876 | LTE_New test case LTE_New test case 6.3.4EB ONOFF time mask for UE category 1bis |
CR revised to R5-185378 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#4476 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
revised | [WTS] [JSN] |
R5-184877 | LTE_New test case 6.3.5EB Power Control for UE category 1bis |
CR revised to R5-185379 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#4477 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
revised | [WTS] [JSN] |
R5-184878 | LTE_New test case 6.3.3EB UE Transmit OFF power for UE category 1bis |
CR revised to R5-185382 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#4478 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
revised | [WTS] [JSN] |
R5-184879 | LTE_New test case 6.3.2EB Minimum Output Power for UE category 1bis |
CR revised to R5-185380 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#4479 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
revised | [WTS] [JSN] |
R5-184880 | LTE_New test case 6.2.5EB Configured UE transmitted Power for UE category 1bis |
CR revised to R5-185383 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#4480 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
revised | [WTS] [JSN] |
R5-184881 | LTE_New test case 6.2.4EB Additional Maximum Power Reduction (A-MPR) for UE category 1bis |
CR revised to R5-185381 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#4481 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
revised | [WTS] [JSN] |
R5-184882 | Alignment of Annex numbering with core spec |
pCR revised to R5-185422 |
Qualcomm Wireless GmbH | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-184883 | Proposal for 5G NR EVM Test Tolerance |
discussion revised to R5-185532 |
Qualcomm Incorporated |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |||
R5-184884 | Update to NB-IoT test conditions for in-band / guard band | CR | ROHDE & SCHWARZ | 36.508 15.2.0 CR#1200 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.1 |
agreed | [WTS] [JSN] |
R5-184885 | LTE_New test case 6.2.3EB Maximum Power Reduction (MPR) for UE category 1bis |
CR revised to R5-185384 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#4482 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
revised | [WTS] [JSN] |
R5-184886 | LTE_New test case 6.2.2EB UE Maximum Output Power for UE category 1bis | CR | Qualcomm Incorporated | 36.521-1 15.2.0 CR#4483 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-184887 | On the relation between MU and TT for RF and RRM conformance testing | discussion | Ericsson | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-184888 | Introduction of maximum output power test cases | pCR | Ericsson | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-184889 | Discussion on testing of fallback CA configurations in Rx CA test cases |
discussion revised to R5-185550 |
Ericsson | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.11 |
revised | [WTS] [JSN] | |
R5-184890 | Test optimization for CA fallback cases in 3DL CA and 4DL CA Receiver test cases | CR | Ericsson | 36.521-2 15.2.0 CR#760 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
withdrawn | [WTS] [JSN] |
R5-184891 | 4Rx support in some 4DL CA and 5DL CA Demodulation test cases |
CR revised to R5-185186 |
Ericsson | 36.521-1 15.2.0 CR#4484 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
revised | [WTS] [JSN] |
R5-184892 | 4Rx branches in some 4DL CA and 5DL CA Demodulation test cases | CR | Ericsson | 36.521-2 15.2.0 CR#761 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-184893 | WP UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports | Work Plan | Ericsson | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184894 | SR UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports | WI status report | Ericsson | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184895 | WP UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE | Work Plan | Ericsson | LTE_EBF_FDMIMO-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184896 | SR UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE | WI status report | Ericsson | LTE_EBF_FDMIMO-UEConTest | Rel-15 |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | |
R5-184897 | Updates to Channel Arrangement section in 38.521-3 | pCR | Qualcomm Wireless GmbH | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-184898 | Proposal for LTE 256QAM EVM Test Tolerance |
discussion revised to R5-185553 |
Qualcomm Incorporated |
R5-80 AI: 5.4.1.2 |
revised | [WTS] [JSN] | |||
R5-184899 | WP UE Conformance Test Aspects – Further enhanced MTC for LTE | Work Plan | Ericsson | LTE_feMTC-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184900 | SR UE Conformance Test Aspects – Further enhanced MTC for LTE | WI status report | Ericsson | LTE_feMTC-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184901 | Updates to feMTC TC 8.2.2.6.6 | CR | Ericsson | 36.523-2 15.2.0 CR#1211 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 6.3.16.3 |
withdrawn | [WTS] [JSN] |
R5-184902 | Corrections and updates to UE Capability IEs |
CR revised to R5-185056 |
Ericsson | 38.508-1 15.0.0 CR#84 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-184903 | Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 | CR | CGC Inc. | 36.521-2 15.2.0 CR#762 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.3 |
withdrawn | [WTS] [JSN] |
R5-184904 | Update to ACS and in-band blocking test cases in TS 38.521-1 |
pCR revised to R5-185415 |
Keysight Technologies UK Ltd | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184905 | Add a new test condition for test case 8.13.3.1.2.5. |
CR revised to R5-185376 |
CGC Inc. | 36.521-2 15.2.0 CR#763 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.3 |
revised | [WTS] [JSN] |
R5-184906 | Add 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 in 36.521-2 | CR | CGC Inc. | 36.521-2 15.2.0 CR#764 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.3 |
withdrawn | [WTS] [JSN] |
R5-184907 | Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-2 |
pCR revised to R5-185191 |
Keysight Technologies UK Ltd | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184908 | FR2_UE_BeamlockMode_IE_38.509 |
CR revised to R5-185523 |
Qualcomm Europe Inc. (Spain) | 38.509 15.0.0 CR#3 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.3 |
revised | [WTS] [JSN] |
R5-184909 | FR2_UE_BeamlockProcedure_38.508-1 |
CR revised to R5-185557 |
Qualcomm Europe Inc. (Spain) | 38.508-1 15.0.0 CR#85 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
revised | [WTS] [JSN] |
R5-184910 | Discussion of test frequencies | discussion | Sprint Corporation | LTE_CA_C_B41_PC2-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184911 | Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. | CR | CGC Inc. | 36.521-2 15.2.0 CR#765 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.3 |
withdrawn | [WTS] [JSN] |
R5-184912 | Update to ACS and inband blocking test cases in TS 38.521-2 |
pCR revised to R5-185192 |
Keysight Technologies UK Ltd | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184913 | Update MU factors for IFF | pCR | Keysight Technologies UK Ltd | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
withdrawn | [WTS] [JSN] |
R5-184914 | Discussion on MU factor for IFF | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184915 | Discussion on low-PSD scenarios | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184916 | Discussion on Dwell time | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184917 | Correction on 4Rx RLM TC in-sync parameters | CR | Qualcomm Wireless GmbH | 36.521-3 15.2.1 CR#2284 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.4 |
agreed | [WTS] [JSN] |
R5-184918 | Correction to multi-layer test case 13.1.20 | CR | Keysight Technologies UK Ltd | 36.523-1 15.2.0 CR#4645 catF | TEI9_Test | Rel-15 |
R5-80 AI: 6.4.3.8 |
agreed | [WTS] [JSN] |
R5-184919 | 5G_FR1_Text_update for_RF_sensitivity_for_SUL_operation |
pCR revised to R5-185325 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184920 | 5G NR_Proposal of TS38.521-1 annex C.0_Downlink signal levels |
pCR revised to R5-185500 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184921 | 5G NR_FR1_Text_Update_for_TX_ Additional spurious emissions |
pCR revised to R5-185501 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184922 | Test Point Analysis for Reference sensitivity level for EN-DC |
discussion revised to R5-185429 |
Qualcomm Incorporated |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |||
R5-184923 | Test Point analysis for FR2 RefSense test case | pCR | Qualcomm Europe Inc. (Spain) | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-184924 | Test Point analysis for FR2 TxSpurious test case |
pCR revised to R5-185491 |
Qualcomm Europe Inc. (Spain) | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-184925 | Test Tolerance: Updates to Cat1bis chapter 8 inter-frequency event triggered reporting tests | CR | Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2285 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
withdrawn | [WTS] [JSN] |
R5-184926 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis |
CR revised to R5-185338 |
Qualcomm UK Ltd | 36.903 14.1.0 CR#412 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184927 | Test Tolerance: Updates to Cat1bis Event triggered reporting tests under AWGN propagation conditions in asynchronous cells with DRX when L3 filtering is used | CR | Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2286 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
withdrawn | [WTS] [JSN] |
R5-184928 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used |
CR revised to R5-185339 |
Qualcomm UK Ltd | 36.903 14.1.0 CR#413 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184929 | Test Tolerance: Updates to Cat1bis Event triggered reporting tests with fading, Annex E and Annex F | CR | Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2287 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
withdrawn | [WTS] [JSN] |
R5-184930 | Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis |
CR revised to R5-185340 |
Qualcomm UK Ltd | 36.903 14.1.0 CR#414 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184931 | Test Tolerance: Updates to Cat1bis intra-frequency Event triggered reporting tests, Annex E and Annex F | CR | Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2288 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
withdrawn | [WTS] [JSN] |
R5-184932 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis |
CR revised to R5-185341 |
Qualcomm UK Ltd | 36.903 14.1.0 CR#415 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
revised | [WTS] [JSN] |
R5-184933 | Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F | CR | Qualcomm UK Ltd | 36.521-3 15.2.1 CR#2289 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
withdrawn | [WTS] [JSN] |
R5-184934 | Test Tolerances analysis for E-UTRAN FDD and TDD Intra-frequency CGI TC 8.1.19_2, 8.1.20_2, 8.2.7_2, 8.2.8_2 for UE category 1bis | CR | Qualcomm UK Ltd | 36.903 14.1.0 CR#416 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
withdrawn | [WTS] [JSN] |
R5-184935 | Cat1bis new RF test case: Occupied bandwidth for UE category 1bis | CR | Qualcomm Austria | 36.521-1 15.2.0 CR#4485 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-184936 | Cat1bis new RF test case: Spectrum Emission Mask for UE category 1bis | CR | Qualcomm Austria | 36.521-1 15.2.0 CR#4486 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-184937 | Cat1bis new RF test case: Additional Spectrum Emission Mask for UE category 1bis | CR | Qualcomm Austria | 36.521-1 15.2.0 CR#4487 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-184938 | Cat1bis new RF test case: Adjacent Channel Leakage power Ratio for UE category 1bis | CR | Qualcomm Austria | 36.521-1 15.2.0 CR#4488 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-184939 | Cat1bis new RF test case: Spurious emission for UE category 1bis | CR | Qualcomm Austria | 36.521-1 15.2.0 CR#4489 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-184940 | Cat1bis new RF test case: Transmit intermodulation for UE category 1bis |
CR revised to R5-185385 |
Qualcomm Austria | 36.521-1 15.2.0 CR#4490 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
revised | [WTS] [JSN] |
R5-184941 | Editorial correction of NS requirements | CR | ROHDE & SCHWARZ | 36.521-1 15.2.0 CR#4491 catF | TEI12_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184942 | Update to carrier leakage test case in TS 38.521-1 |
pCR revised to R5-185312 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184943 | TP for updating TR 38.905 with FR1 Carrier Leakage test point analysis |
pCR revised to R5-185311 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-184944 | Discussion on test point selection for Carrier Leakage in FR1 |
discussion revised to R5-185310 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184945 | Update to EVM test case in TS 38.521-1 |
pCR revised to R5-185326 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184946 | TP for updating TR 38.905 with EVM test point analysis |
pCR revised to R5-185412 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-184947 | Update to EVM equalizer spectrum flatness test case in TS 38.521-1 |
pCR revised to R5-185315 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184948 | TP for updating TR 38.905 with FR1 EVM equalizer spectrum flatness test point analysis |
pCR revised to R5-185314 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-184949 | Discussion on test point selection for EVM equalizer spectrum flatness in FR1 |
discussion revised to R5-185313 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184950 | Update to Frequency Error test case in TS 38.521-1 |
pCR revised to R5-185317 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184951 | TP for updating TR 38.905 with FR1 Frequency Error test point analysis |
pCR revised to R5-185316 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-184952 | Discussion on test point selection for Frequency Error test case in FR1 | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-184953 | Addition of Annex Global In-Channel TX-Test to 38.521-1 |
pCR revised to R5-185327 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184954 | Addition of Annex Global In-Channel TX-Test to 38.521-2 |
pCR revised to R5-185353 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184955 | Update to In-band Emissions test case in TS 38.521-1 |
pCR revised to R5-185320 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
revised | [WTS] [JSN] |
R5-184956 | TP for updating TR 38.905 with FR1 In-band Emissions test point analysis |
pCR revised to R5-185319 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-184957 | Discussion on test point selection for In-band Emissions test case in FR1 |
discussion revised to R5-185318 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184958 | TP for updating TR 38.905 with FR2 SEM test point analysis |
pCR revised to R5-185215 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-184959 | Update to Test frequencies for SEM in TS 38.521-2 |
pCR revised to R5-185194 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184960 | Addition of Frequency Error test case to TS 38.521-2 |
pCR revised to R5-185350 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184961 | TP for updating TR 38.905 with FR2 Frequency Error test point analysis | pCR | ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-184962 | Discussion on test point selection for Frequency Error in FR2 |
discussion revised to R5-185349 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | ||
R5-184963 | Addition of EVM test case to TS 38.521-2 |
pCR revised to R5-185195 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184964 | TP for updating TR 38.905 with FR2 EVM test point analysis | pCR | ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
withdrawn | [WTS] [JSN] |
R5-184965 | Discussion on test point selection for EVM in FR2 | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184966 | Addition of Carrier Leakage test case to TS 38.521-2 |
pCR revised to R5-185196 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184967 | TP for updating TR 38.905 with FR2 Carrier Leakage test point analysis | pCR | ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
withdrawn | [WTS] [JSN] |
R5-184968 | Discussion on test point selection for Carrier Leakage in FR2 | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184969 | Addition of In-band Emissions test case to TS 38.521-2 | pCR | ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
withdrawn | [WTS] [JSN] |
R5-184970 | TP for updating TR 38.905 with FR2 In-band Emissions test point analysis | pCR | ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
withdrawn | [WTS] [JSN] |
R5-184971 | Discussion on test point selection for In-band Emissions in FR2 | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184972 | Addition of EVM equalizer spectral flatness test case to TS 38.521-2 | pCR | ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
withdrawn | [WTS] [JSN] |
R5-184973 | TP for updating TR 38.905 with FR2 EVM equalizer spectral flatness test point analysis | pCR | ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
withdrawn | [WTS] [JSN] |
R5-184974 | Discussion on test point selection for EVM equalizer spectral flatness in FR2 | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184975 | Discussion on Measurement Uncertainty in FR2 | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184976 | TP on Measurement Uncertainty Contributions in FR2 |
pCR revised to R5-185214 |
ROHDE & SCHWARZ | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
revised | [WTS] [JSN] |
R5-184977 | L2 Preamble Parameter Update for Multi-PDN configuration |
CR revised to R5-185099 |
Qualcomm Korea | 38.523-1 15.0.0 CR#68 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184978 | Discussion on TT for EN-DC test cases | discussion | Huawei,HiSilicon | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184979 | Discussion on Test configuraion table for EN-DC test cases | discussion | Huawei,HiSilicon | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
withdrawn | [WTS] [JSN] | ||
R5-184980 | Cat1bis test cases applicability | CR | Qualcomm Austria RFFE GmbH | 36.521-2 15.2.0 CR#766 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.3 |
agreed | [WTS] [JSN] |
R5-184981 | Correction to NR RLC test cases 7.1.2.2.3 and 7.1.2.2.4 |
CR revised to R5-185100 |
Keysight Technologies UK Ltd, MCC TF160 | 38.523-1 15.0.0 CR#69 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184982 | Resubmission of Cat1bis applicability CR | CR | ETSI MCC (Qualcomm Korea, Bureau Veritas, Rohde & Schwarz, CATR) | 36.521-2 15.2.0 CR#767 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.3 |
agreed | [WTS] [JSN] |
R5-184983 | Introduction of maximum output power test cases |
pCR revised to R5-185197 |
Ericsson | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-184984 | Correction to NR RRC test case 8.2.3.14.1 |
CR revised to R5-185101 |
Keysight Technologies UK Ltd | 38.523-1 15.0.0 CR#70 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-184985 | Correction to V2X TC 24.1.16 & 24.1.19 |
CR revised to R5-185112 |
ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-1 15.2.0 CR#4646 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
revised | [WTS] [JSN] |
R5-184986 | Correction to V2V TC 24.1.2 |
CR revised to R5-185141 |
ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-1 15.2.0 CR#4647 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 6.3.5.3 |
revised | [WTS] [JSN] |
R5-184987 | Addition of reference dedicated EPS bearer context #7 for V2X testing |
CR revised to R5-185104 |
CATT | 36.508 15.2.0 CR#1201 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.1 |
revised | [WTS] [JSN] |
R5-184988 | Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 |
CR revised to R5-185175 |
CGC Inc. | 36.521-1 15.2.0 CR#4492 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
revised | [WTS] [JSN] |
R5-184989 | Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. |
CR revised to R5-185176 |
CGC Inc. | 36.521-1 15.2.0 CR#4493 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
revised | [WTS] [JSN] |
R5-184990 | New Test Case for 36.579-6 - 6.1.1.8 | pCR | NIST | 36.579-6 0.0.2 | MCImp-UEConTest | Rel-16 |
R5-80 AI: 6.3.23.6 |
approved | [WTS] [JSN] |
R5-184991 | Correction to Reference sensitivity level for CA UL Allocation in Table 7.3A.1.4.1-1 | CR | Intel Corporation (UK) Ltd | 36.521-1 15.2.0 CR#4494 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.2.2 |
agreed | [WTS] [JSN] |
R5-184992 | CPWG180802-1 LS on Over-the-Air Radiated Performance Testing for 5G mm-Wave (FR2) User Equipment |
LS in source LS: CPWG180802-1 |
CTIA 5G Millimeter-Wave OTA Sub-Working Group |
R5-80 AI: 3 |
noted | [WTS] [JSN] | |||
R5-184993 | Addition of test points for UL-CA_2A-12A in TC 6.3.2A.2 | CR | Dekra | 36.521-1 15.2.0 CR#4495 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
withdrawn | [WTS] [JSN] |
R5-184994 | Addition of test points for UL-CA_2A-12A in TC 6.3.5A.2.2 | CR | Dekra | 36.521-1 15.2.0 CR#4496 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
withdrawn | [WTS] [JSN] |
R5-184995 | WP UE Conformance Test Aspects - Requirements for a new UE category 1bis with single receiver based on category 1 for LTE | Work Plan | Qualcomm Inc. | LTE_UE_cat_1RX-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184996 | SR UE Conformance Test Aspects - Requirements for a new UE category 1bis with single receiver based on category 1 for LTE | WI status report | Qualcomm Inc. | LTE_UE_cat_1RX-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-184997 | LS from 5GAA for rel-15 2 RX vehicle mounted UE | LS in | 5GAA WG2 |
R5-80 AI: 3 |
noted | [WTS] [JSN] | |||
R5-184998 | RAN5#79 WG Action Points |
report revision of R5-184006 |
ETSI Secretariat |
R5-80 AI: 2.1 |
noted | [WTS] [JSN] | |||
R5-184999 | MCC TF160 Status Report |
report revision of R5-184070 |
MCC TF160 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |||
R5-185000 | New WID for Rel-16 LTE CA |
WID new revision of R5-184432 |
Ericsson | Rel-16 |
R5-80 AI: 7.4.1 |
agreed | [WTS] [JSN] | ||
R5-185001 | Discussion paper on principles for defining NR test frequencies and selecting associated parameters for SS to signal |
discussion revision of R5-184449 |
Ericsson, Sprint, MCC TF160 | 5GS_NR_LTE-UEConTest |
R5-80 AI: 4.5.3 |
noted | [WTS] [JSN] | ||
R5-185002 | Correction to ATTACH ACCEPT message for SMS only |
CR revision of R5-184094 |
ROHDE & SCHWARZ | 36.508 15.2.0 CR#11791 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.1 |
agreed | [WTS] [JSN] |
R5-185003 | Correction of 6.2.3.2 Test Frequency for CA_3A-27A |
CR revision of R5-184404 |
KT Corp. | 36.508 15.2.0 CR#11901 catF | TEI12_Test | Rel-15 |
R5-80 AI: 6.4.1 |
agreed | [WTS] [JSN] |
R5-185004 | Correction to Idle mode Inter-RAT G<>E test case 6.2.3.21 to allow optional IMS registration on EUTRAN cell |
CR revision of R5-184331 |
Keysight Technologies UK Ltd, Samsung | 36.523-1 15.2.0 CR#45981 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.1 |
agreed | [WTS] [JSN] |
R5-185005 | Update of number of DL PDCP SDUs in test cases 7.1.7.1.x |
CR revision of R5-184503 revised to R5-185169 |
MediaTek Inc. | 36.523-1 15.2.0 CR#46021 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.3.2.1 |
revised | [WTS] [JSN] |
R5-185006 | Update of DL 256QAM TCs for high UE DL Categories |
CR revision of R5-184504 |
MediaTek Inc. | 36.523-1 15.2.0 CR#46031 catF | TEI12_Test, LTE_SC_enh_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.2.1 |
agreed | [WTS] [JSN] |
R5-185007 | Correction to RRC TC 8.5.4.1 |
CR revision of R5-184505 |
MediaTek Inc. | 36.523-1 15.2.0 CR#46041 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.3.3.1 |
agreed | [WTS] [JSN] |
R5-185008 | Correction to EMM test case 9.2.3.1.25 |
CR revision of R5-184053 |
ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-1 15.2.0 CR#45821 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.4 |
agreed | [WTS] [JSN] |
R5-185009 | Correction to testcase 9.2.2.1.9 for CAT-M1 UEs |
CR revision of R5-184532 |
ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-1 15.2.0 CR#46101 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.4 |
agreed | [WTS] [JSN] |
R5-185010 | Update of EMM test case 9.2.3.2.17 |
CR revision of R5-184709 |
Qualcomm Incorporated | 36.523-1 15.2.0 CR#46201 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.4 |
agreed | [WTS] [JSN] |
R5-185011 | Correction of clause 4.3.3.2.3 |
CR revised to R5-185133 |
Ericsson | 38.508-1 15.0.0 CR#86 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 4.5.2 |
revised | [WTS] [JSN] |
R5-185012 | Clarification for NB-IoT test case 22.3.1.1 |
CR revision of R5-184079 |
MCC TF160, Rohde&Schwarz | 36.523-1 15.2.0 CR#45841 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-185013 | Correction to NB-IoT test case 22.5.8 |
CR revision of R5-184089 |
ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#45851 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-185014 | Correction to NB-IoT test case 22.5.14 |
CR revision of R5-184090 |
ROHDE & SCHWARZ, Qualcomm | 36.523-1 15.2.0 CR#45861 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-185015 | Corrections to NBIOT NAS TC 22.5.7b |
CR revision of R5-184216 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#46401 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-185016 | Correction to NB-IoT test cases 22.4.8 and 22.4.9 |
CR revision of R5-184322 |
ANRITSU LTD | 36.523-1 15.2.0 CR#45961 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
withdrawn | [WTS] [JSN] |
R5-185017 | Correction to NB-IoT test cases 22.4.4, 22.4.8 and 22.4.9 | CR | ANRITSU LTD, Qualcomm | 36.523-1 15.2.0 CR#4648 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-185018 | Correction to NB-IoT test case 22.2.9 |
CR revision of R5-184518 |
ANRITSU LTD | 36.523-1 15.2.0 CR#46091 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-185019 | Update to NB-IOT test case 22.1.1 M2 |
CR revision of R5-184711 |
Qualcomm Incorporated, Anritsu, Rohde & Schwarz | 36.523-1 15.2.0 CR#46221 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-185020 | Update to NB-IOT test case 22.3.1.2 |
CR revision of R5-184712 |
Qualcomm Incorporated | 36.523-1 15.2.0 CR#46231 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-185021 | Correction to NB-IoT testcase 22.3.3.5 |
CR revision of R5-184807 |
ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#46411 catF | TEI13_Test, NB_IOT-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.11 |
agreed | [WTS] [JSN] |
R5-185022 | Correction to NB-IoT test case 22.4.20a execution guideline | CR | Anritsu Ltd, Qualcomm | 36.523-2 15.2.0 CR#1212 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.4 |
agreed | [WTS] [JSN] |
R5-185023 | Updates of 6.2.3.2 Test Frequency for CA_8A-27A |
CR revision of R5-184393 |
KT Corp. | 36.508 15.2.0 CR#11891 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 6.3.17.1 |
agreed | [WTS] [JSN] |
R5-185024 | Addition of new R15 CA configurations to 36.523-2 |
CR revision of R5-184588 |
Bureau Veritas, Ericsson | 36.523-2 15.2.0 CR#11981 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 6.3.17.3 |
agreed | [WTS] [JSN] |
R5-185025 | Multi-PDN Handling in EN-DC |
discussion revision of R5-184350 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.19 |
noted | [WTS] [JSN] | |
R5-185026 | ASN.1 Version Handling for NSA and SA |
discussion revision of R5-184351 |
Qualcomm Korea | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.19 |
noted | [WTS] [JSN] | |
R5-185027 | Default channel bandwidth of new NR bands for non-CA signaling test cases |
discussion revision of R5-184664 |
NTT DOCOMO, INC., CMCC, KDDI Corporation, KT Corp., Orange, Telecom Italia S.p.A. |
R5-80 AI: 6.3.13.19 |
noted | [WTS] [JSN] | |||
R5-185028 | Add SRB1 and SRB2 with NR PDCP |
CR revision of R5-184055 |
Ericsson | 38.508-1 15.0.0 CR#21 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185029 | Update serving cell |
CR revision of R5-184084 |
Ericsson, DOCOMO Communications Lab | 38.508-1 15.0.0 CR#31 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185030 | Introduce SA RRC messages |
CR revision of R5-184097 |
Ericsson | 38.508-1 15.0.0 CR#51 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185031 | Correct IE FrequencyInfoDL |
CR revision of R5-184126 |
Ericsson, DOCOMO Communications Lab | 38.508-1 15.0.0 CR#61 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185032 | Introduce SA system information blocks |
CR revision of R5-184127 |
Ericsson | 38.508-1 15.0.0 CR#71 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185033 | Introduce SA other information elements |
CR revision of R5-184134 |
Ericsson | 38.508-1 15.0.0 CR#81 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185034 | Updates to PDCCH and SearchSpace configurations |
CR revision of R5-184176 revised to R5-185171 |
MCC TF160, NTT DOCOMO, INC. | 38.508-1 15.0.0 CR#91 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
revised | [WTS] [JSN] |
R5-185035 | Correct IE GSCN-ValueNR |
CR revision of R5-184318 |
Ericsson, DOCOMO Communications Lab | 38.508-1 15.0.0 CR#131 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185036 | Update of FR1 signal levels |
CR revision of R5-184339 |
ANRITSU LTD | 38.508-1 15.0.0 CR#171 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.2.2 |
agreed | [WTS] [JSN] |
R5-185037 | Addition of IP Connectivity check procedure |
CR revision of R5-184358 |
Qualcomm Tech. Netherlands B.V, MCC TF160 | 38.508-1 15.0.0 CR#221 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185038 | Introduce SA radio resource control information elements |
CR revision of R5-184560 |
Ericsson | 38.508-1 15.0.0 CR#531 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185039 | Update IE PhysicalCellGroupConfig |
CR revision of R5-184597 |
Ericsson, DOCOMO Communications Lab | 38.508-1 15.0.0 CR#541 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185040 | Introduce cell configurations and timer tolerances chapter headers |
CR revision of R5-184598 |
Ericsson | 38.508-1 15.0.0 CR#551 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185041 | Add IE SSB-MTC |
CR revision of R5-184600 |
Ericsson, DOCOMO Communications Lab | 38.508-1 15.0.0 CR#571 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185042 | Update BWP |
CR revision of R5-184616 |
DOCOMO Communications Lab, Ericsson | 38.508-1 15.0.0 CR#581 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185043 | Update PDSCH-Config |
CR revision of R5-184618 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#601 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185044 | Update PUCCH and PUSCH configuration |
CR revision of R5-184620 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#621 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185045 | Update RACH configuration |
CR revision of R5-184621 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#631 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185046 | Update CellGroupConfig |
CR revision of R5-184623 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#651 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185047 | Update CSI-MeasConfig |
CR revision of R5-184624 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#661 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185048 | Update MeasConfig |
CR revision of R5-184625 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#671 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185049 | Update other information elements |
CR revision of R5-184626 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#681 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185050 | Update RadioBearerConfig |
CR revision of R5-184628 |
DOCOMO Communications Lab. | 38.508-1 15.0.0 CR#701 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185051 | Specifying content for MeasResultSCG-Failure |
CR revision of R5-184675 |
Samsung | 38.508-1 15.0.0 CR#731 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185052 | Editorial correction to band representation of non-contiguous EN-DC band combination |
CR revision of R5-184706 |
Keysight Technologies UK Ltd | 38.508-1 15.0.0 CR#751 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185053 | Correction to RLC-Config IE |
CR revision of R5-184713 |
Ericsson | 38.508-1 15.0.0 CR#761 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185054 | Correction to RadioBearerConfig-DRB |
CR revision of R5-184714 |
Ericsson | 38.508-1 15.0.0 CR#771 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185055 | Corrections ard updates to BandCombinationList and Feature Set IEs |
CR revision of R5-184715 |
Ericsson | 38.508-1 15.0.0 CR#781 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185056 | Corrections and updates to UE Capability IEs |
CR revision of R5-184902 |
Ericsson | 38.508-1 15.0.0 CR#841 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185057 | Editorial updates to 38.509 |
CR revision of R5-184673 |
Samsung, MCC TF160 | 38.509 15.0.0 CR#11 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.3 |
agreed | [WTS] [JSN] |
R5-185058 | Addition of Test Loop for SDAP testing |
CR revision of R5-184700 |
Motorola Mobility | 38.509 15.0.0 CR#21 catB | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.3 |
withdrawn | [WTS] [JSN] |
R5-185059 | Correction to NR MAC test case 7.1.1.3.2 |
CR revision of R5-184175 |
Keysight Technologies UK Ltd | 38.523-1 15.0.0 CR#11 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185060 | Addition of Correct Handling of DL HARQ process PDSCH Aggregation test case 7.1.1.2.2 |
CR revision of R5-184220 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#41 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185061 | Addition of NR CA reconfiguration test case 8.2.4.2.1.1 |
CR revision of R5-184221 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#51 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185062 | Addition of NR CA reconfiguration test case 8.2.4.2.1.2 |
CR revision of R5-184222 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#61 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185063 | Addition of Random access test case 7.1.1.1.4 |
CR revision of R5-184225 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#91 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-185064 | Addition of 5GS NR SDAP test case 7.1.4.1 |
CR revision of R5-184324 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#151 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185065 | Correction to 5GS MAC Test case 7.1.1.1.2 Random access procedure / Successful / C-RNTI Based / Preamble selected by MAC itself |
CR revision of R5-184338 |
Qualcomm Korea | 38.523-1 15.0.0 CR#161 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185066 | Correction to 5GS MAC Test case 7.1.1.5.3 DRX operation / Short cycle configured / Parameters configured by RRC |
CR revision of R5-184340 |
Qualcomm Korea | 38.523-1 15.0.0 CR#171 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185067 | Correction to 5GS RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation |
CR revision of R5-184341 |
Qualcomm Korea | 38.523-1 15.0.0 CR#181 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185068 | Correction to 5GS RLC Test case 7.1.2.3.11 AM RLC / RLC re-establishment procedure |
CR revision of R5-184342 |
Qualcomm Korea | 38.523-1 15.0.0 CR#191 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185069 | Addition of NR CA / NR SCell addition / modification / release / Success test cases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 |
CR revision of R5-184345 |
Qualcomm Korea | 38.523-1 15.0.0 CR#221 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185070 | Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC |
CR revision of R5-184357 |
Qualcomm Tech. Netherlands B.V | 38.523-1 15.0.0 CR#271 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185071 | Correction to 5GS RRC TC 8.2.4.3.1.1 |
CR revision of R5-184498 |
TDIA, CATT | 38.523-1 15.0.0 CR#291 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185072 | Addition of 5GS RRC TC 8.2.4.3.1.2 |
CR revision of R5-184499 |
TDIA, CATT | 38.523-1 15.0.0 CR#301 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185073 | Corrections to Layer 2 test cases |
CR revision of R5-184520 |
Motorola Mobility, Huawei | 38.523-1 15.0.0 CR#331 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185074 | Corrections to MAC test case 7.1.2.2.1 |
CR revision of R5-184521 |
Motorola Mobility, MCC TF160 | 38.523-1 15.0.0 CR#341 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185075 | Corrections to MAC test case 7.1.2.3.1 |
CR revision of R5-184522 |
Motorola Mobility, MCC TF160 | 38.523-1 15.0.0 CR#351 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185076 | Addition of new MAC RACH test case for PDCCH order |
CR revision of R5-184524 |
Motorola Mobility | 38.523-1 15.0.0 CR#371 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185077 | Addition of new MAC test case for Scell Activation Deactivation |
CR revision of R5-184526 |
Motorola Mobility | 38.523-1 15.0.0 CR#391 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185078 | Addition of new MAC UL TBS test case with transform precoding configured |
CR revision of R5-184528 |
Motorola Mobility | 38.523-1 15.0.0 CR#411 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185079 | Correction to default pre-test conditions for UM RLC test cases |
CR revision of R5-184552 |
Keysight Technologies UK Ltd | 38.523-1 15.0.0 CR#421 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185080 | New NAS test case 9.1.5.1.12 |
CR revision of R5-184591 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#431 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185081 | New NAS test case 9.1.6.1.4 |
CR revision of R5-184593 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#441 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
withdrawn | [WTS] [JSN] |
R5-185082 | Correction to NR PDCP test case 7.1.3.5.1 |
CR revision of R5-184603 |
ANRITSU LTD | 38.523-1 15.0.0 CR#451 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185083 | Correction to NR RLC test case 7.1.2.3.3 and 7.1.2.3.4 |
CR revision of R5-184612 |
ANRITSU LTD | 38.523-1 15.0.0 CR#461 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185084 | Update to TLS setup | CR | MCC TF160, Motorola Solutions UK Ltd. | 36.579-1 13.1.0 CR#9 catF | TEI13_Test, MCPTT-ConTest | Rel-13 |
R5-80 AI: 6.5.9.1 |
agreed | [WTS] [JSN] |
R5-185085 | Addition of UM condition to RLC-Bearer-Config IE | CR | Ericsson | 38.508-1 15.0.0 CR#87 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185086 | Update to EPS SM Test case for Multi-PDN |
CR revised to R5-185167 |
Qualcomm Inc. | 38.523-1 15.0.0 CR#71 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
revised | [WTS] [JSN] |
R5-185087 | Update to Emergency Call test case 19.1.3 for eCall category bit usage |
CR revision of R5-184705 |
Qualcomm Incorporated | 34.229-1 14.3.0 CR#12931 catF | TEI9_Test | Rel-14 |
R5-80 AI: 6.5.6.1 |
agreed | [WTS] [JSN] |
R5-185088 | Adding SMS over IP configuration to applicabilities |
CR revision of R5-184059 |
ROHDE & SCHWARZ | 34.229-2 14.3.0 CR#2471 catF | TEI8_Test | Rel-14 |
R5-80 AI: 6.5.6.2 |
agreed | [WTS] [JSN] |
R5-185089 | Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of NR cells / EN-DC |
CR revision of R5-184661 |
Intertek | 38.523-1 15.0.0 CR#491 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185090 | CR of AM RLC test case 7.1.2.3.10 |
CR revision of R5-184670 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#501 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185091 | Update of RRC SCG failure TC 8.2.5.1.1 |
CR revision of R5-184676 |
Samsung, Qualcomm | 38.523-1 15.0.0 CR#511 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185092 | Update of RRC SCG failure TC 8.2.5.2.1 |
CR revision of R5-184677 |
Samsung, Qualcomm | 38.523-1 15.0.0 CR#521 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185093 | Update of RRC SCG failure TC 8.2.5.3.1 |
CR revision of R5-184678 |
Samsung, Qualcomm | 38.523-1 15.0.0 CR#531 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185094 | Update of RRC SCG failure TC 8.2.5.4.1 |
CR revision of R5-184679 |
Samsung, Qualcomm | 38.523-1 15.0.0 CR#541 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185095 | Addition of 5GS NR SDAP test case 7.1.4.2 |
CR revision of R5-184702 |
Motorola Mobility | 38.523-1 15.0.0 CR#571 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185096 | Update of 5GS NR RRC test case 8.2.3.6.1 |
CR revision of R5-184770 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#641 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185097 | Update of 5GS NR RRC test case 8.2.3.8.1 |
CR revision of R5-184774 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#661 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185098 | Update of 5GS NR RRC test case 8.2.1.1.1 |
CR revision of R5-184777 |
ROHDE & SCHWARZ | 38.523-1 15.0.0 CR#671 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185099 | L2 Preamble Parameter Update for Multi-PDN configuration |
CR revision of R5-184977 |
Qualcomm Korea | 38.523-1 15.0.0 CR#681 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185100 | Correction to NR RLC test cases 7.1.2.2.3 and 7.1.2.2.4 |
CR revision of R5-184981 |
Keysight Technologies UK Ltd, MCC TF160 | 38.523-1 15.0.0 CR#691 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185101 | Correction to NR RRC test case 8.2.3.14.1 |
CR revision of R5-184984 |
Keysight Technologies UK Ltd | 38.523-1 15.0.0 CR#701 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185102 | Addition of applicability and tests conditions for 5GC test cases 8.2.4.3.1.2, 8.2.4.3.1.3, 9.1.2.1 and 9.1.2.2 |
CR revision of R5-184496 |
CATT, TDIA | 38.523-2 15.0.0 CR#21 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.5 |
withdrawn | [WTS] [JSN] |
R5-185103 | Specifying content for SCGFailureInformationNR |
CR revision of R5-184674 |
Samsung | 36.508 15.2.0 CR#11961 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13. |
agreed | [WTS] [JSN] |
R5-185104 | Addition of reference dedicated EPS bearer context #7 for V2X testing |
CR revision of R5-184987 |
CATT | 36.508 15.2.0 CR#12011 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.1 |
agreed | [WTS] [JSN] |
R5-185105 | Addition of Test Case:” LWA / T351 Expiry” to WLAN/3GPP Radio Level Integration and Interworking Enhancement Interworking Work Item |
CR revision of R5-184145 |
Intel Corporation (UK) Ltd | 36.523-1 15.2.0 CR#45911 catF | LTE_WLAN_radio-UEConTest | Rel-15 |
R5-80 AI: 6.3.3.2 |
agreed | [WTS] [JSN] |
R5-185106 | Correction of Test Cases 8.2.5.4 and 8.2.5.5 |
CR revision of R5-184192 |
Intel Corporation (UK) Ltd | 36.523-1 15.2.0 CR#45921 catF | LTE_WLAN_radio-UEConTest | Rel-15 |
R5-80 AI: 6.3.3.2 |
agreed | [WTS] [JSN] |
R5-185107 | Addition of new V2X test case 24.2.4 |
CR revision of R5-184632 revised to R5-185160 |
CAICT | 36.523-1 15.2.0 CR#46151 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
revised | [WTS] [JSN] |
R5-185108 | Correction to V2X test case 24.1.12 |
CR revision of R5-184636 |
CAICT | 36.523-1 15.2.0 CR#46161 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-185109 | Correction to V2X test case 24.1.1, 24.1.3, 24.1.5, 24.1.6, 24.1.10 and 24.1.11 |
CR revision of R5-184652 |
CAICT | 36.523-1 15.2.0 CR#46171 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-185110 | New test case for V2X Sidelink using Tx parameters based on measured CBR and PPPP |
CR revision of R5-184813 |
Sporton, TTA | 36.523-1 15.2.0 CR#46421 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
withdrawn | [WTS] [JSN] |
R5-185111 | New test case for V2X Sidelink with SL SPS Transmission | CR | Sporton, TTA | 36.523-1 15.2.0 CR#4649 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-185112 | Correction to V2X TC 24.1.16 & 24.1.19 |
CR revision of R5-184985 |
ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-1 15.2.0 CR#46461 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-185113 | Addition of NB_IOTenh-UEConTest test case scenarios and default SIB content |
CR revision of R5-184791 |
CATT, TDIA, Starpoint, Sporton | 36.508 15.2.0 CR#11981 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.1 |
agreed | [WTS] [JSN] |
R5-185114 | Correction to eNB-IoT test case 22.3.2.7 |
CR revision of R5-184095 |
MCC TF160, TDIA | 36.523-1 15.2.0 CR#45901 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-185115 | Addition to NB-IoT testcase 22.3.1.6a |
CR revision of R5-184501 |
TDIA, CATT, Starpoint | 36.523-1 15.2.0 CR#46011 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-185116 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.8 |
CR revision of R5-184784 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#46291 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-185117 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.10 |
CR revision of R5-184787 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#46311 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-185118 | Addition of new NB_IOTenh-UEConTest test case 22.4.24 |
CR revision of R5-184788 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#46321 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-185119 | Addition of new NB_IOTenh-UEConTest test case 22.4.25 |
CR revision of R5-184789 |
CATT, TDIA, Starpoint | 36.523-1 15.2.0 CR#46331 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-185120 | New test case for NB-IoT UM RLC |
CR revision of R5-184815 |
Sporton, TTA, TDIA | 36.523-1 15.2.0 CR#46431 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.3 |
agreed | [WTS] [JSN] |
R5-185121 | Addition of applicability and tests conditions for new Enhancements NB-IoT TC 22.3.2.6 | CR | Sporton | 36.523-2 15.2.0 CR#1213 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 6.3.15.4 |
agreed | [WTS] [JSN] |
R5-185122 | Corrections to MCPTT Authorization |
CR revision of R5-184663 |
MCC TF160 | 36.579-1 13.1.0 CR#71 catF | TEI13_Test, MCPTT-ConTest | Rel-13 |
R5-80 AI: 6.5.9.1 |
agreed | [WTS] [JSN] |
R5-185123 | Adding a new Rel-14 TC on Private Call Call-Back Request / Client Originated (CO) / Private call call-back fulfilment |
CR revision of R5-184686 |
Samsung | 36.579-2 13.1.0 CR#101 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.2 |
agreed | [WTS] [JSN] |
R5-185124 | Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Originated (CO) |
CR revision of R5-184688 |
Samsung | 36.579-2 13.1.0 CR#121 catF | MCImp-UEConTest | Rel-14 |
R5-80 AI: 6.3.23.2 |
agreed | [WTS] [JSN] |
R5-185125 | Corrections to UE Test Loop Mode H |
CR revision of R5-184076 |
MCC TF160 | 36.509 13.6.0 CR#1931 catF | TEI13_Test, NB_IOT-UEConTest | Rel-13 |
R5-80 AI: 6.4.2 |
agreed | [WTS] [JSN] |
R5-185126 | Correction to SSAC connected mode test cases 13.5.1a and 13.5.3a for IMS Enabled UE |
CR revision of R5-184323 |
Keysight Technologies UK Ltd | 36.523-1 15.2.0 CR#45971 catF | TEI12_Test | Rel-15 |
R5-80 AI: 6.4.3.8 |
agreed | [WTS] [JSN] |
R5-185127 | New Work Item Proposal: UE Conformance Test Aspects - Addition of Power Class 1 UE to bands B31/B72 for LTE |
WID new revision of R5-184334 |
Airbus DS SLC | Rel-15 |
R5-80 AI: 7.4.1 |
agreed | [WTS] [JSN] | ||
R5-185128 | New WID on UE Conformance Test Aspects - ProSe Support for Band 72 in LTE |
WID new revision of R5-184337 |
Airbus DS SLC | Rel-15 |
R5-80 AI: 7.4.1 |
agreed | [WTS] [JSN] | ||
R5-185129 | Update of UE test loop mode E |
CR revision of R5-184739 |
Huawei,HiSilicon, CATT | 36.509 15.0.0 CR#1961 catA | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R5-185130 | Update of UE test loop mode E | CR | Huawei,HiSilicon, CATT | 36.509 14.4.0 CR#197 catF | LTE_V2X-UEConTest | Rel-14 |
R5-80 AI: 4.5.1 |
agreed | [WTS] [JSN] |
R5-185131 | Reuse of demodulation setup for signalling tests in FR2 |
discussion revision of R5-184188 |
ANRITSU LTD | 5GS_NR_LTE-UEConTest |
R5-80 AI: 4.5.2 |
noted | [WTS] [JSN] | ||
R5-185132 | OTA Chamber requirements for 5G NR Signalling test cases |
discussion revision of R5-184568 |
Keysight Technologies UK Ltd |
R5-80 AI: 6.3.13.19 |
noted | [WTS] [JSN] | |||
R5-185133 | Correction of clause 4.3.3.2.3 |
CR revision of R5-185011 |
Ericsson | 38.508-1 15.0.0 CR#861 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 4.5.2 |
agreed | [WTS] [JSN] |
R5-185134 | Draft TR 38.905 v1.0.0 | draft TR | Ericsson LM | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |
R5-185135 | Correction to 10.7.4 regarding CE mode |
CR revision of R5-184067 |
ROHDE & SCHWARZ | 36.523-1 15.2.0 CR#45831 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.3.5 |
agreed | [WTS] [JSN] |
R5-185136 | Update EPS Session Management test case in section 10 of TS 36.523-1. |
CR revision of R5-184044 |
FirstNet, AT&T | 36.523-1 15.2.0 CR#45811 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.3.5 |
withdrawn | [WTS] [JSN] |
R5-185137 | Update to applicability condition of Intra-frequency measurement reporting test cases for CAT-M1 UEs |
CR revision of R5-184732 |
Qualcomm Incorporated | 36.523-2 15.2.0 CR#12041 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-185138 | Removal of 1xPre-Registation and 1xCSFB test cases applicability |
CR revision of R5-184735 |
Qualcomm Incorporated | 36.523-2 15.2.0 CR#12061 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.4 |
agreed | [WTS] [JSN] |
R5-185139 | Routine maintenance for TS 36.523-3 |
CR revision of R5-184080 revised to R5-185180 |
MCC TF160 | 36.523-3 15.0.0 CR#42541 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.5 |
revised | [WTS] [JSN] |
R5-185140 | New CA band combination CA_1A-3A-7A-20A - Update of table A.4.3.3.3-5 |
CR revision of R5-184119 |
Vodafone GmbH | 36.523-2 15.2.0 CR#11871 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 6.3.4.3 |
agreed | [WTS] [JSN] |
R5-185141 | Correction to V2V TC 24.1.2 |
CR revision of R5-184986 |
ROHDE & SCHWARZ, Qualcomm Incorporated | 36.523-1 15.2.0 CR#46471 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 6.3.5.3 |
agreed | [WTS] [JSN] |
R5-185142 | Draft TS 36.579-6 v0.0.3 | draft TS | Samsung | MCImp-UEConTest | Rel-14 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |
R5-185143 | Draft TS 36.579-7 v0.0.3 | draft TS | Samsung | MCImp-UEConTest | Rel-14 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |
R5-185144 | Draft TS 38.521-2 v1.0.0 | draft TS | CAICT | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |
R5-185145 | Draft TS 38.521-3 v1.0.0 | draft TS | Qualcomm Europe Inc.(France) | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |
R5-185146 | Draft TR 38.903 v1.0.0 | draft TR | Huawei | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.5 |
approved | [WTS] [JSN] | |
R5-185147 | LS Concerning RAN5 Response to ITU-R Working Party 5D LS on definition of test methods for OTA unwanted emissions of IMT radio equipment |
LS out LS is reply to R5-184024 LS To: TSG RAN |
TSG WG RAN5 |
R5-80 AI: 7.5 |
postponed | [WTS] [JSN] | |||
R5-185148 | Addition of NR CA reconfiguration test case 8.2.4.2.1.3 |
CR revision of R5-184223 |
Huawei, Hisilicon | 38.523-1 15.0.0 CR#71 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185149 | Corrections to RRC TC - PSCell addition, modification and release / SCG DRB / EN-DC |
CR revision of R5-184354 |
Qualcomm Tech. Netherlands B.V | 38.523-1 15.0.0 CR#241 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185150 | Corrections to RRC TC - Bearer Modification / Handling for bearer type change with security key change / EN-DC |
CR revision of R5-184355 |
Qualcomm Tech. Netherlands B.V | 38.523-1 15.0.0 CR#251 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185151 | Corrections to RRC TC - Bearer Modification / Uplink data path / Split DRB Reconfiguration / EN-DC |
CR revision of R5-184356 |
Qualcomm Tech. Netherlands B.V | 38.523-1 15.0.0 CR#261 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185152 | Addition of new MAC test case for Power Headroom report |
CR revision of R5-184525 |
Motorola Mobility | 38.523-1 15.0.0 CR#381 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185153 | Addition of RRC Default Pre-test conditions for NSA |
CR revision of R5-184613 |
Qualcomm Korea | 38.523-1 15.0.0 CR#471 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185154 | Correction to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC |
CR revision of R5-184756 |
Qualcomm Incorporated | 38.523-1 15.0.0 CR#581 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185155 | Updates to NAS test case 10.2.1.2 |
CR revision of R5-184767 |
Ericsson LM | 38.523-1 15.0.0 CR#621 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185156 | EN-DC: Test Model updates |
CR revision of R5-184073 revised to R5-185172 |
MCC TF160 | 38.523-3 15.0.0 CR#11 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.6 |
revised | [WTS] [JSN] |
R5-185157 | Update of NR test cases title and applicability |
CR revision of R5-184753 |
Qualcomm Incorporated | 38.523-2 15.0.0 CR#51 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.5 |
agreed | [WTS] [JSN] |
R5-185158 | Update Reference Table 6.6.2-1A dedicated EPS bearer contexts |
CR revision of R5-184045 |
FirstNet, AT&T | 36.508 15.2.0 CR#11761 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.1 |
agreed | [WTS] [JSN] |
R5-185159 | Correction to CAT-M1 Test case 8.2.4.27 |
CR revision of R5-184543 |
Anritsu Ltd., Nordic Semiconductor ASA | 36.523-1 15.2.0 CR#46111 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 6.4.3.3.2 |
agreed | [WTS] [JSN] |
R5-185160 | Addition of new V2X test case 24.2.4 |
CR revision of R5-185107 |
CAICT | 36.523-1 15.2.0 CR#46152 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 6.3.12.3 |
agreed | [WTS] [JSN] |
R5-185161 | Addition of PICS |
CR revision of R5-184699 |
Motorola Mobility | 38.508-2 15.0.0 CR#11 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.2 |
agreed | [WTS] [JSN] |
R5-185162 | Addition of missing and new test cases applicabilities |
CR revision of R5-184531 |
Motorola Mobility | 38.523-2 15.0.0 CR#31 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.5 |
agreed | [WTS] [JSN] |
R5-185163 | Modified RRC_Connected procedure for Multi PDN throughout the test case. |
CR revision of R5-184346 |
Qualcomm Korea, Ericsson | 38.508-1 15.0.0 CR#181 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185164 | Update RRCConnectionReconfiguration message for EN-DC |
CR revision of R5-184042 |
Ericsson, Qualcomm Inc. | 36.508 15.2.0 CR#11751 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13. |
agreed | [WTS] [JSN] |
R5-185165 | Update EN-DC Generic Procedure Parameter for Multi-PDN addition throughout Test Case |
CR revision of R5-184348 |
Qualcomm Korea | 38.508-1 15.0.0 CR#201 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185166 | Modification of EPS & Data Radio Bearer ID mapping for EN-DC Test cases |
CR revision of R5-184349 |
Qualcomm Korea | 36.508 15.2.0 CR#11881 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13. |
agreed | [WTS] [JSN] |
R5-185167 | Update to EPS SM Test case for Multi-PDN |
CR revision of R5-185086 |
Qualcomm Inc. | 38.523-1 15.0.0 CR#711 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.4 |
agreed | [WTS] [JSN] |
R5-185168 | Introduction of OTA signaling test environment |
CR revision of R5-184851 |
Keysight Technologies UK Ltd, Anritsu Ltd | 38.508-1 15.0.0 CR#821 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185169 | Update of number of DL PDCP SDUs in test cases 7.1.7.1.x |
CR revision of R5-185005 |
MediaTek Inc. | 36.523-1 15.2.0 CR#46022 catF | TEI14_Test | Rel-15 |
R5-80 AI: 6.4.3.2.1 |
agreed | [WTS] [JSN] |
R5-185170 | Meeting notes of offline discussion on FR2 UE common test setup |
discussion revised to R5-185179 |
Anritsu |
R5-80 AI: 7.2.5 |
revised | [WTS] [JSN] | |||
R5-185171 | Updates to PDCCH and SearchSpace configurations |
CR revision of R5-185034 |
MCC TF160, NTT DOCOMO, INC. | 38.508-1 15.0.0 CR#92 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.1 |
agreed | [WTS] [JSN] |
R5-185172 | EN-DC: Test Model updates |
CR revision of R5-185156 |
MCC TF160 | 38.523-3 15.0.0 CR#12 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 6.3.13.6 |
agreed | [WTS] [JSN] |
R5-185173 | Test Frequencies |
CR revision of R5-184332 |
Sprint Corporation, Ericsson | 38.508-1 15.0.0 CR#161 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.2.1 |
agreed | [WTS] [JSN] |
R5-185174 | Reference sensitivity requirements for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A |
CR revision of R5-184775 |
WE Certification Oy, DISH Network | 36.521-1 15.2.0 CR#44571 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-185175 | Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 |
CR revision of R5-184988 |
CGC Inc. | 36.521-1 15.2.0 CR#44921 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185176 | Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. |
CR revision of R5-184989 |
CGC Inc. | 36.521-1 15.2.0 CR#44931 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
R5-185177 | Introduction of test frequencies for signalling testing in clause 6 |
CR revision of R5-184478 |
Ericsson, TF160 | 38.508-1 15.0.0 CR#511 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.2.2 |
agreed | [WTS] [JSN] |
R5-185178 | Addition of Test frequency for EN-DC B1_n78 |
CR revision of R5-184352 |
Qualcomm Korea | 38.508-1 15.0.0 CR#211 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 7.2.2 |
withdrawn | [WTS] [JSN] |
R5-185179 | Meeting notes of offline discussion on FR2 UE common test setup |
discussion revision of R5-185170 |
Anritsu |
R5-80 AI: 7.2.5 |
noted | [WTS] [JSN] | |||
R5-185180 | Routine maintenance for TS 36.523-3 |
CR revision of R5-185139 |
MCC TF160 | 36.523-3 15.0.0 CR#42542 catF | TEI8_Test | Rel-15 |
R5-80 AI: 6.4.5 |
agreed | [WTS] [JSN] |
R5-185181 | WP - UE Conformance Test Aspects - eHST |
Work Plan revision of R5-184561 |
CMCC | LTE_high_speed-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-185182 | SR - eHST after RAN5#80 |
WI status report revision of R5-184562 |
CMCC | LTE_high_speed-UEConTest |
R5-80 AI: 7.4.2 |
noted | [WTS] [JSN] | ||
R5-185184 | Addition of V2X new TC 12.2.2 |
CR revision of R5-184274 |
Huawei,HiSilicon, Rohde & Schwarz | 36.521-3 15.2.1 CR#22501 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
agreed | [WTS] [JSN] |
R5-185185 | Band 41 HPUE Maximum Output Power |
CR revision of R5-185548 |
CMCC | 36.521-1 15.2.0 CR#43802 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2 |
agreed | [WTS] [JSN] |
R5-185186 | 4Rx support in some 4DL CA and 5DL CA Demodulation test cases |
CR revision of R5-184891 |
Ericsson | 36.521-1 15.2.0 CR#44841 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
agreed | [WTS] [JSN] |
R5-185187 | FR2_RefSens_TestConfig_38.521-2 |
pCR revision of R5-184367 |
Qualcomm Europe Inc. (Spain) | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185188 | DL and UL RMC updated for FR2 tests |
pCR revision of R5-184576 |
Bureau Veritas | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185189 | Downlink physical channel updated for FR2 tests |
pCR revision of R5-184577 |
Bureau Veritas | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185190 | OCNG Patterns updated for FR2 tests |
pCR revision of R5-184578 |
Bureau Veritas | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185191 | Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-2 |
pCR revision of R5-184907 |
Keysight Technologies UK Ltd | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185192 | Update to ACS and inband blocking test cases in TS 38.521-2 |
pCR revision of R5-184912 |
Keysight Technologies UK Ltd | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185193 | Addition of Annex Global In-Channel TX-Test to 38.521-2 |
pCR revision of R5-185353 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185194 | Update to Test frequencies for SEM in TS 38.521-2 |
pCR revision of R5-184959 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185195 | Addition of EVM test case to TS 38.521-2 |
pCR revision of R5-184963 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185196 | Addition of Carrier Leakage test case to TS 38.521-2 |
pCR revision of R5-184966 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185197 | Introduction of maximum output power test cases |
pCR revision of R5-184983 |
Ericsson | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185198 | Addition of 6.2B.4.1.4 Configured OP for Inter-Band EN-DC including FR2 |
pCR revision of R5-184747 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185199 | Addition of 6.2B.4.1.5 Configured OP for Inter-Band EN-DC including both FR1 and FR2 |
pCR revision of R5-184748 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185200 | TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC |
pCR revision of R5-185471 |
Ericsson LM | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185201 | Introduction of TC 7.4B.1 |
pCR revision of R5-185475 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185202 | Introduction of 7.4B.2 |
pCR revision of R5-185476 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185203 | Introduction of 7.4B.3 |
pCR revision of R5-185477 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185204 | 5G NR_EN_DC with FR1_Text update for RX sensitivity |
pCR revision of R5-185482 |
Qualcomm Incorporated | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185205 | 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission |
pCR revision of R5-185487 |
Qualcomm Incorporated | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185206 | Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC |
pCR revision of R5-185510 |
SGS Wireless | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185207 | Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC |
pCR revision of R5-185511 |
SGS Wireless | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185208 | Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 |
pCR revision of R5-185512 |
SGS Wireless | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185209 | TP for Clause 4.1.1 of TS 38.522 |
pCR revision of R5-184121 |
CMCC | 38.522 0.3.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.8 |
approved | [WTS] [JSN] |
R5-185210 | TP for Clause 4.1.2 of TS 38.522 |
pCR revision of R5-184122 |
CMCC | 38.522 0.3.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.8 |
approved | [WTS] [JSN] |
R5-185211 | TP for Clause 4.1.3 of TS 38.522 |
pCR revision of R5-184123 |
CMCC | 38.522 0.3.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.8 |
approved | [WTS] [JSN] |
R5-185212 | pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave |
pCR revision of R5-185352 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
approved | [WTS] [JSN] |
R5-185213 | pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 |
pCR revision of R5-184819 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
approved | [WTS] [JSN] |
R5-185214 | TP on Measurement Uncertainty Contributions in FR2 |
pCR revision of R5-184976 |
ROHDE & SCHWARZ | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
approved | [WTS] [JSN] |
R5-185215 | TP for updating TR 38.905 with FR2 SEM test point analysis |
pCR revision of R5-184958 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185216 | TP for updating TR38.905 with UE AMPR for NS_04 Intra-band contigous EN-DC |
pCR revision of R5-185430 |
Ericsson LM | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185250 | Introduction of test frequencies for NR band n1 |
CR revision of R5-184450 |
Ericsson | 38.508-1 15.0.0 CR#231 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185251 | Introduction of test frequencies for NR band n2 |
CR revision of R5-184451 |
Ericsson | 38.508-1 15.0.0 CR#241 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185252 | Introduction of test frequencies for NR band n3 |
CR revision of R5-184452 |
Ericsson | 38.508-1 15.0.0 CR#251 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185253 | Introduction of test frequencies for NR band n5 |
CR revision of R5-184453 |
Ericsson | 38.508-1 15.0.0 CR#261 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185254 | Introduction of test frequencies for NR band n7 |
CR revision of R5-184454 |
Ericsson | 38.508-1 15.0.0 CR#271 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185255 | Introduction of test frequencies for NR band n8 |
CR revision of R5-184455 |
Ericsson | 38.508-1 15.0.0 CR#281 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185256 | Introduction of test frequencies for NR band n12 |
CR revision of R5-184456 |
Ericsson | 38.508-1 15.0.0 CR#291 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185257 | Introduction of test frequencies for NR band n20 |
CR revision of R5-184457 |
Ericsson | 38.508-1 15.0.0 CR#301 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185258 | Introduction of test frequencies for NR band n25 |
CR revision of R5-184458 |
Ericsson | 38.508-1 15.0.0 CR#311 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185259 | Introduction of test frequencies for NR band n28 |
CR revision of R5-184459 |
Ericsson | 38.508-1 15.0.0 CR#321 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185260 | Introduction of test frequencies for NR band n34 |
CR revision of R5-184460 |
Ericsson | 38.508-1 15.0.0 CR#331 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185261 | Introduction of test frequencies for NR band n38 |
CR revision of R5-184461 |
Ericsson | 38.508-1 15.0.0 CR#341 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185262 | Introduction of test frequencies for NR band n39 |
CR revision of R5-184462 |
Ericsson | 38.508-1 15.0.0 CR#351 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185263 | Introduction of test frequencies for NR band n40 |
CR revision of R5-184463 |
Ericsson | 38.508-1 15.0.0 CR#361 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185264 | Update of test frequencies for NR band n41 |
CR revision of R5-184464 |
Ericsson, Sprint | 38.508-1 15.0.0 CR#371 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185265 | Introduction of test frequencies for NR band n51 |
CR revision of R5-184465 |
Ericsson | 38.508-1 15.0.0 CR#381 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185266 | Introduction of test frequencies for NR band n66 |
CR revision of R5-184466 |
Ericsson, Dish Network | 38.508-1 15.0.0 CR#391 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185267 | Introduction of test frequencies for NR band n70 |
CR revision of R5-184467 |
Ericsson, Dish Network | 38.508-1 15.0.0 CR#401 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185268 | Update of test frequencies for NR band n71 |
CR revision of R5-184468 |
Ericsson, Dish Network | 38.508-1 15.0.0 CR#411 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185269 | Introduction of test frequencies for NR band n75 |
CR revision of R5-184469 |
Ericsson | 38.508-1 15.0.0 CR#421 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185270 | Introduction of test frequencies for NR band n76 |
CR revision of R5-184470 |
Ericsson | 38.508-1 15.0.0 CR#431 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185300 | LS on RAN4-RAN5 5G-NR RF pending issues during RAN5#80 |
LS out LS is reply to R4-1809345 LS To: TSG WG RAN4 LS reply in R4-1811529 |
TSG WG RAN5 | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.6 |
approved | [WTS] [JSN] | ||
R5-185301 | Discussion on test point selection for NR Out-of-band in FR1 |
discussion revision of R5-184489 |
CAICT | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185302 | Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC |
pCR revised to R5-185510 |
SGS Wireless | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185303 | Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC |
pCR revised to R5-185511 |
SGS Wireless | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185304 | Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 |
pCR revised to R5-185512 |
SGS Wireless | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185305 | Update of FR1 test case 6.2.1 |
pCR revision of R5-184299 |
Huawei,HiSilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185306 | Discussion on starting point of 200ms in FR1 RF test procedures |
discussion revision of R5-184741 |
Huawei,HiSilicon, Keysight | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185307 | TP for updating TR38.905 with FR1 AMPR test point analyses with NS_35 |
pCR revision of R5-184751 |
Ericsson LM | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185308 | Discussion on the test applicability for the modulation of Pi/2-BPSK |
discussion revision of R5-184834 |
Huawei, Hisilicon | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185309 | Test Point analysis for FR1 Configured Output Power for SUL |
pCR revision of R5-184837 |
Huawei,HiSilicon | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185310 | Discussion on test point selection for Carrier Leakage in FR1 |
discussion revision of R5-184944 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185311 | TP for updating TR 38.905 with FR1 Carrier Leakage test point analysis |
pCR revision of R5-184943 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185312 | Update to carrier leakage test case in TS 38.521-1 |
pCR revision of R5-184942 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185313 | Discussion on test point selection for EVM equalizer spectrum flatness in FR1 |
discussion revision of R5-184949 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185314 | TP for updating TR 38.905 with FR1 EVM equalizer spectrum flatness test point analysis |
pCR revision of R5-184948 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185315 | Update to EVM equalizer spectrum flatness test case in TS 38.521-1 |
pCR revision of R5-184947 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185316 | TP for updating TR 38.905 with FR1 Frequency Error test point analysis |
pCR revision of R5-184951 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185317 | Update to Frequency Error test case in TS 38.521-1 |
pCR revision of R5-184950 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185318 | Discussion on test point selection for In-band Emissions test case in FR1 |
discussion revision of R5-184957 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185319 | TP for updating TR 38.905 with FR1 In-band Emissions test point analysis |
pCR revision of R5-184956 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185320 | Update to In-band Emissions test case in TS 38.521-1 |
pCR revision of R5-184955 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185321 | TP to TS38.521-1:Operating bands and channel arrangement |
pCR revision of R5-184085 |
China Unicom | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185322 | Addition of FR1 test case 6.2.4 |
pCR revision of R5-184300 |
Huawei,HiSilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185323 | Update of FR1 test case 6.3.1 |
pCR revision of R5-184301 |
Huawei,HiSilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185324 | Addition of Uplink Physical Channels in Annex |
pCR revision of R5-184824 |
Huawei, Hisilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185325 | 5G_FR1_Text_update for_RF_sensitivity_for_SUL_operation |
pCR revision of R5-184919 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185326 | Update to EVM test case in TS 38.521-1 |
pCR revision of R5-184945 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185327 | Addition of Annex Global In-Channel TX-Test to 38.521-1 |
pCR revision of R5-184953 |
ROHDE & SCHWARZ | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185328 | Discussion on the way to write Clause 7.4 Maximum Input Level and Clause 7.5 Adjacent Channel Selectivity in TS 38.521-3 |
discussion revision of R5-184124 |
CMCC, HUAWEI | Rel-15 |
R5-80 AI: 5.3.13.17 |
approved | [WTS] [JSN] | ||
R5-185329 | Add Clause 7.5 into TS 38.521-3 |
pCR revision of R5-184125 |
CMCC | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
withdrawn | [WTS] [JSN] |
R5-185330 | Addition of test points for UL-CA_4A-12A in TC 6.3.2A.2 | CR | DEKRA | 36.521-1 15.2.0 CR#4497 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
R5-185331 | Addition of test points for UL-CA_4A-12A in TC 6.3.5A.2.2 | CR | DEKRA | 36.521-1 15.2.0 CR#4498 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
R5-185332 | Addition of 6.2B.4.1.1 Configured OP for Intra-Band Contiguous EN-DC |
pCR revision of R5-184744 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185333 | Addition of 6.2B.4.1.2 Configured OP for Intra-Band Non-Contiguous EN-DC |
pCR revision of R5-184745 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185334 | Discussion of LTE Test point selection for EN-DC with FR1 Tx Spurious emission Test | discussion | Qualcomm Inc. | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
not concluded | [WTS] [JSN] | ||
R5-185335 | Estimation of measurement uncertainty for FR2 TRx test cases |
discussion revision of R5-184426 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185336 | Removing brackets from MU values in FR2 |
discussion revision of R5-184427 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185337 | Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F |
CR revision of R5-184211 |
Qualcomm UK Ltd | 36.521-3 15.2.1 CR#22371 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-185338 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis |
CR revision of R5-184926 |
Qualcomm UK Ltd | 36.903 14.1.0 CR#4121 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185339 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used |
CR revision of R5-184928 |
Qualcomm UK Ltd | 36.903 14.1.0 CR#4131 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185340 | Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis |
CR revision of R5-184930 |
Qualcomm UK Ltd | 36.903 14.1.0 CR#4141 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185341 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis |
CR revision of R5-184932 |
Qualcomm UK Ltd | 36.903 14.1.0 CR#4151 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185342 | Editorial cleaning up of Rel-14 CA 5DL RSRP measurement TC 9.1.51 |
CR revision of R5-184288 |
Huawei,HiSilicon | 36.521-3 15.2.1 CR#22531 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.4 |
agreed | [WTS] [JSN] |
R5-185343 | New CA band combination CA_1A-3A-7A-20A - Update of table 7.3A.5, 7.3A.9 and refsens |
CR revision of R5-184117 |
Vodafone GmbH | 36.521-1 15.2.0 CR#43401 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
R5-185344 | New CA band combination CA_1A-3A-7A-20A - Update of table A.4.6.3-5 |
CR revision of R5-184118 |
Vodafone GmbH | 36.521-2 15.2.0 CR#7371 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4.3 |
withdrawn | [WTS] [JSN] |
R5-185345 | New CA band combination CA_1A-3A-7A-20A - Update of test point analysis |
CR revision of R5-184120 |
Vodafone GmbH | 36.905 15.1.0 CR#1411 catF | LTE_CA_R14-UEConTest | Rel-15 |
R5-80 AI: 5.3.4. |
agreed | [WTS] [JSN] |
R5-185347 | Discussion on FR2 TRx spurious test procedure |
discussion revision of R5-184487 |
Anritsu | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185348 | Correction to FR2 Spurious TC and inroduction of TRP measurement grid requirement |
pCR revision of R5-184634 |
Anritsu | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185349 | Discussion on test point selection for Frequency Error in FR2 |
discussion revision of R5-184962 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185350 | Addition of Frequency Error test case to TS 38.521-2 |
pCR revision of R5-184960 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185351 | Update across EN-DC RF test cases in TS 38.521-3 | pCR | Qualcomm Wireless GmbH | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185352 | pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave |
pCR revision of R5-184738 revised to R5-185212 |
MVG Industries | 38.903 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.15 |
revised | [WTS] [JSN] |
R5-185353 | Addition of Annex Global In-Channel TX-Test to 38.521-2 |
pCR revision of R5-184954 revised to R5-185193 |
ROHDE & SCHWARZ | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
revised | [WTS] [JSN] |
R5-185354 | Update of V2V TCs 6.5.2.3G.1 & 6.5.2.4G & 6.6.2.2G.1& 6.6.3G.1 |
CR revision of R5-184181 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#43461 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-185355 | Update to test case 6.3.2G.1 for V2V services based on LTE sidelink |
CR revision of R5-184418 |
KTL | 36.521-1 15.2.0 CR#44011 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-185356 | Update of Additional Maximum Power Reduction (A-MPR) for V2X Communication / Non-concurrent with E-UTRA uplink transmissions |
CR revision of R5-184653 |
LG Electronics | 36.521-1 15.2.0 CR#44391 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-185357 | Update to Annex G for V2V/V2X Demod Perf tests |
CR revision of R5-184662 |
Qualcomm Wireless GmbH | 36.521-1 15.2.0 CR#44451 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-185358 | Update of multiple V2V RF test cases for proper test mode setting |
CR revision of R5-184740 |
Huawei,HiSilicon | 36.521-1 15.2.0 CR#44541 catF | LTE_SL_V2V-UEConTest | Rel-15 |
R5-80 AI: 5.3.5.3 |
agreed | [WTS] [JSN] |
R5-185359 | Correction of the title for OTDOA IOT tests | CR | ROHDE & SCHWARZ | 37.571-3 15.2.0 CR#99 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.7 |
agreed | [WTS] [JSN] |
R5-185360 | Update of V2X TCs 6.6.3G.2_1 & 6.6.3G.3_1 |
CR revision of R5-184183 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#43481 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185361 | Update of V2X TCs 6.6.3G.2 & 6.6.3G.3 |
CR revision of R5-184184 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#43491 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185362 | Correction to 36521-1-chapter 6_V2V and V2X |
CR revision of R5-184193 |
Tejet | 36.521-1 15.2.0 CR#43501 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185363 | Cleaning up V2X test cases in TS 36.521-1 |
CR revision of R5-184267 |
Huawei,HiSilicon | 36.521-1 15.2.0 CR#43721 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185364 | Update to test case 6.3.2G.2 for LTE-based V2X Services |
CR revision of R5-184419 |
KTL | 36.521-1 15.2.0 CR#44021 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185365 | Update to test case 6.3.2G.3 for LTE-based V2X Services |
CR revision of R5-184420 |
KTL | 36.521-1 15.2.0 CR#44031 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185366 | Update of V2X test case 6.7G.2 |
CR revision of R5-184544 |
SRTC | 36.521-1 15.2.0 CR#44131 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185367 | Addition of new TC 6.6.2.3G.2 |
CR revision of R5-184545 |
SRTC | 36.521-1 15.2.0 CR#44141 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185368 | Introduction of new V2X test case 6.5.2.1G.2 Error Vector Magnitude (EVM) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions |
CR revision of R5-184546 |
CAICT | 36.521-1 15.2.0 CR#44151 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185369 | Introduction of new V2X test case 6.5.2.1G.3 Error Vector Magnitude (EVM) for V2X Communication / Intra-band contiguous multi-carrier operation |
CR revision of R5-184548 |
CAICT | 36.521-1 15.2.0 CR#44161 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185370 | Update to Additional Maximum Power Reduction (A-MPR) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions |
CR revision of R5-184655 |
LG Electronics | 36.521-1 15.2.0 CR#44401 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185371 | Updates to Align Initial Conditions with Other V2X Test Cases |
CR revision of R5-184776 |
PCTEST Engineering Lab | 36.521-1 15.2.0 CR#44581 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185372 | Update of V2X Receiver Test Cases |
CR revision of R5-184848 |
SGS Wireless | 36.521-1 15.2.0 CR#44741 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185373 | Update of V2X RRM |
CR revision of R5-184847 |
SGS Wireless, Huawei | 36.521-3 15.2.1 CR#22791 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
agreed | [WTS] [JSN] |
R5-185374 | Addition of test applicabilities of multiple V2X test cases |
CR revision of R5-184269 |
Huawei,HiSilicon | 36.521-2 15.2.0 CR#7381 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.4 |
agreed | [WTS] [JSN] |
R5-185375 | Correction to 4x4 CA demodulation tests |
CR revision of R5-184239 |
Anritsu | 36.521-1 15.2.0 CR#43561 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.2 |
agreed | [WTS] [JSN] |
R5-185376 | Add a new test condition for test case 8.13.3.1.2.5. |
CR revision of R5-184905 |
CGC Inc. | 36.521-2 15.2.0 CR#7631 catF | LTE_4Rx_AP_DL_CA-UEConTest | Rel-15 |
R5-80 AI: 5.3.10.3 |
agreed | [WTS] [JSN] |
R5-185377 | TS 36.521-1 Annex F update for UE cat 1bis test cases |
CR revision of R5-184874 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#44751 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-185378 | LTE_New test case LTE_New test case 6.3.4EB ONOFF time mask for UE category 1bis |
CR revision of R5-184876 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#44761 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-185379 | LTE_New test case 6.3.5EB Power Control for UE category 1bis |
CR revision of R5-184877 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#44771 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-185380 | LTE_New test case 6.3.2EB Minimum Output Power for UE category 1bis |
CR revision of R5-184879 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#44791 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-185381 | LTE_New test case 6.2.4EB Additional Maximum Power Reduction (A-MPR) for UE category 1bis |
CR revision of R5-184881 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#44811 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-185382 | LTE_New test case 6.3.3EB UE Transmit OFF power for UE category 1bis |
CR revision of R5-184878 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#44781 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-185383 | LTE_New test case 6.2.5EB Configured UE transmitted Power for UE category 1bis |
CR revision of R5-184880 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#44801 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-185384 | LTE_New test case 6.2.3EB Maximum Power Reduction (MPR) for UE category 1bis |
CR revision of R5-184885 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#44821 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-185385 | Cat1bis new RF test case: Transmit intermodulation for UE category 1bis |
CR revision of R5-184940 |
Qualcomm Austria | 36.521-1 15.2.0 CR#44901 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.2 |
agreed | [WTS] [JSN] |
R5-185386 | Completion of Chapter 7 RRM cat 1bis test cases |
CR revision of R5-184202 |
Qualcomm UK Ltd | 36.521-3 15.2.1 CR#22321 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-185387 | Introduction of FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO |
CR revision of R5-184646 |
TTA | 36.521-1 15.2.0 CR#44341 catF | LTE_EBF_FDMIMO-UEConTest | Rel-15 |
R5-80 AI: 5.3.15.2 |
agreed | [WTS] [JSN] |
R5-185388 | Introduction of TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO |
CR revision of R5-184648 |
TTA | 36.521-1 15.2.0 CR#44361 catF | LTE_EBF_FDMIMO-UEConTest | Rel-15 |
R5-80 AI: 5.3.15.2 |
agreed | [WTS] [JSN] |
R5-185389 | Applicabilities addition of test cases 8.3.1.1.9 and 8.3.2.1.10 |
CR revision of R5-184649 |
TTA | 36.521-2 15.2.0 CR#7531 catF | LTE_EBF_FDMIMO-UEConTest | Rel-15 |
R5-80 AI: 5.3.15.3 |
agreed | [WTS] [JSN] |
R5-185390 | DL and UL RMC updated for FR1 tests |
pCR revision of R5-184573 |
Bureau Veritas | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185391 | Test Tolerance: Updates to Cat1bis inter frequency RSRP accuracy tests and Annex F |
CR revision of R5-184165 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#22271 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-185392 | Test Tolerance: Updates to Cat1bis inter frequency RSRQ accuracy tests and Annex F |
CR revision of R5-184166 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#22281 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-185393 | Test Tolerance: Updates to Cat1bis intra frequency RSRP accuracy tests and Annex F |
CR revision of R5-184167 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#22291 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-185394 | Test Tolerance: Updates to Cat1bis intra frequency RSRQ accuracy tests and Annex F |
CR revision of R5-184168 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#22301 catF | LTE_UE_cat_1RX-UEConTest | Rel-15 |
R5-80 AI: 5.3.11.4 |
agreed | [WTS] [JSN] |
R5-185395 | Test Tolerance Analysis for RRM TC 9.1.1.1_2 and 9.1.2.1_2 |
CR revision of R5-184147 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3831 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185396 | Test Tolerance Analysis for RRM TC 9.1.1.2_2 and 9.1.2.2_2 |
CR revision of R5-184155 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3861 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185397 | Test Tolerance Analysis for RRM TC 9.1.3.1_2 and 9.1.4.1_2 |
CR revision of R5-184156 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3871 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185398 | Test Tolerance Analysis for RRM TC 9.1.3.2_2 and 9.1.4.2_2 |
CR revision of R5-184157 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3881 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185399 | Test Tolerance Analysis for RRM TC 9.1.5.1_2 |
CR revision of R5-184158 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3891 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185400 | Test Tolerance Analysis for RRM TC 9.1.5.2_2 |
CR revision of R5-184159 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3901 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185401 | Test Tolerance Analysis for RRM TC 9.2.3.1_2 and 9.2.4.1_2 |
CR revision of R5-184161 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3921 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185402 | Test Tolerance Analysis for RRM TC 9.2.3.2_2 and 9.2.4.2_2 |
CR revision of R5-184162 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3931 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185403 | Test Tolerance Analysis for RRM TC 9.2.4A.1_2 |
CR revision of R5-184163 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3941 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185404 | Test Tolerance Analysis for RRM TC 9.2.4A.2_2 |
CR revision of R5-184164 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3951 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185405 | Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 |
CR revision of R5-184185 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#4001 catF | LTE_UE_cat_1RX-UEConTest | Rel-14 |
R5-80 AI: 5.3.11.8 |
agreed | [WTS] [JSN] |
R5-185406 | Introduction of Additional spurious emissions for UL 256QAM |
CR revision of R5-184640 |
TTA | 36.521-1 15.2.0 CR#44311 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
agreed | [WTS] [JSN] |
R5-185407 | Addition of applicability for TC6.6.3.3_2 |
CR revision of R5-184643 |
TTA | 36.521-2 15.2.0 CR#7511 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.3 |
agreed | [WTS] [JSN] |
R5-185408 | TP for updating test case 6.2.3 UE AMPR |
pCR revision of R5-184754 |
Ericsson LM | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185409 | Addition of NB-IOT Guardband Test Frequencies for 10 MHz |
CR revision of R5-184111 |
ROHDE & SCHWARZ | 36.508 15.2.0 CR#11811 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.1 |
agreed | [WTS] [JSN] |
R5-185410 | Discussion on approach for defining EN-DC tests in TS 38.521-3 |
discussion revised to R5-185468 |
Qualcomm Wireless GmbH | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
revised | [WTS] [JSN] | |
R5-185411 | Update of FR1 test case 6.2.2 |
pCR revision of R5-184863 |
CAICT | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185412 | TP for updating TR 38.905 with EVM test point analysis |
pCR revision of R5-184946 |
ROHDE & SCHWARZ | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185413 | 5G NR_FR1_Text_update for TX Spurious Emission |
pCR revision of R5-184865 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185414 | Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-1 |
pCR revision of R5-184875 |
Keysight Technologies UK Ltd | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185415 | Update to ACS and in-band blocking test cases in TS 38.521-1 |
pCR revision of R5-184904 |
Keysight Technologies UK Ltd | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185416 | Correction to nrs-CRS-PowerOffset-r13 for NB-IOT OTDOA tests |
CR revision of R5-184112 |
ROHDE & SCHWARZ | 37.571-1 15.2.0 CR#2681 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.6 |
agreed | [WTS] [JSN] |
R5-185417 | NB-IOT OTDOA reporting delay test cases not testable |
CR revision of R5-184113 |
ROHDE & SCHWARZ | 37.571-1 15.2.0 CR#2691 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.6 |
agreed | [WTS] [JSN] |
R5-185418 | Correction of the applicability for OTDOA IOT tests |
CR revision of R5-184132 |
ROHDE & SCHWARZ | 37.571-3 15.2.0 CR#971 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.7 |
withdrawn | [WTS] [JSN] |
R5-185419 | Changes to eMTC OTDOA tests |
CR revision of R5-184114 |
ROHDE & SCHWARZ | 37.571-1 15.2.0 CR#2701 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.5 |
agreed | [WTS] [JSN] |
R5-185420 | Addition of Assistance Data for OTDOA eMTC tests |
CR revision of R5-184131 |
ROHDE & SCHWARZ | 37.571-5 15.2.0 CR#1841 catF | LTE_feMTC-UEConTest | Rel-15 |
R5-80 AI: 5.3.16.7 |
agreed | [WTS] [JSN] |
R5-185421 | Addition of missing assistance data for modernized GPS and the GPS L5 signal for LTE minimum performance sub-test 4 |
CR revision of R5-184028 |
Spirent Communications | 37.571-5 15.2.0 CR#1791 catF | TEI9_Test | Rel-15 |
R5-80 AI: 5.5.11 |
agreed | [WTS] [JSN] |
R5-185422 | Alignment of Annex numbering with core spec |
pCR revision of R5-184882 |
Qualcomm Wireless GmbH | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185423 | Discussion on Uplink configuration for NR Transmit Intermodulation in FR1 |
discussion revision of R5-184497 |
KTL | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185424 | Addition of TT analysis of eHST FDD Intra-frequency event reporting. |
CR revision of R5-184148 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3841 catF | LTE_high_speed-UEConTest | Rel-14 |
R5-80 AI: 5.3.9.5 |
agreed | [WTS] [JSN] |
R5-185425 | Addition of TT analysis of V2X uplink timing test case |
CR revision of R5-184149 |
Qualcomm Europe Inc. (Spain) | 36.903 14.1.0 CR#3851 catF | LTE_V2X-UEConTest | Rel-14 |
R5-80 AI: 5.3.12.6 |
agreed | [WTS] [JSN] |
R5-185426 | New test case: 6.2.3A.3_2, Maximum Power Reduction (MPR) for CA (intra-band non-contiguous DL CA and UL CA) for UL 256QAM |
CR revision of R5-184326 |
Ericsson | 36.521-1 15.2.0 CR#43791 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
agreed | [WTS] [JSN] |
R5-185427 | New UL 256QAM test case: 6.6.2.2_2 Additional Spectrum Emission Mask for UL 256QAM |
CR revision of R5-184697 |
Ericsson | 36.521-1 15.2.0 CR#44491 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
agreed | [WTS] [JSN] |
R5-185428 | Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 |
CR revision of R5-184725 |
Ericsson | 36.521-2 15.2.0 CR#7551 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.3 |
agreed | [WTS] [JSN] |
R5-185429 | Test Point Analysis for Reference sensitivity level for EN-DC |
discussion revision of R5-184922 |
Qualcomm Incorporated |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |||
R5-185430 | TP for updating TR38.905 with UE AMPR for NS_04 Intra-band contigous EN-DC |
pCR revised to R5-185216 |
Ericsson LM | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
revised | [WTS] [JSN] |
R5-185431 | eLAA_correction to 6.3.5A.1.2 and 6.3.5A.2.2 |
CR revision of R5-184194 |
Tejet | 36.521-1 15.2.0 CR#43511 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 5.3.7.2 |
agreed | [WTS] [JSN] |
R5-185432 | eLAA_Update to 6.6.3.1A.2 |
CR revision of R5-184196 |
Tejet | 36.521-1 15.2.0 CR#43531 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 5.3.7.2 |
agreed | [WTS] [JSN] |
R5-185433 | eLAA: Updates to Adjacent Channel Leakage power Ratio for CA |
CR revision of R5-184694 |
Qualcomm Europe Inc. (Spain) | 36.521-1 15.2.0 CR#44471 catF | LTE_eLAA-UEConTest | Rel-15 |
R5-80 AI: 5.3.7.2 |
agreed | [WTS] [JSN] |
R5-185434 | Addition of new UL 256QAM test case - A-MPR for 2UL CA intra-band contiguous |
CR revision of R5-184556 |
CETECOM GmbH | 36.521-1 15.2.0 CR#44191 catF | LTE_UL_CAP_enh-UEConTest | Rel-15 |
R5-80 AI: 5.3.19.2 |
agreed | [WTS] [JSN] |
R5-185435 | Correction of test points and test requirements for TC 6.2.4A.2_1 |
CR revision of R5-184555 |
CETECOM GmbH | 36.521-1 15.2.0 CR#44181 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-185436 | Correction of test points and test requirements for TC 6.2.4A.2 |
CR revision of R5-184554 |
CETECOM GmbH | 36.521-1 15.2.0 CR#44171 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-185437 | Test point and test requirements analysis for CA_3A-41A, 41A-42A,3A-42A spurious test cases |
CR revision of R5-184833 |
Huawei, Hisilicon | 36.905 15.1.0 CR#1551 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2. |
agreed | [WTS] [JSN] |
R5-185438 | Introcution of V2X TC 6.5.2.4G.3 |
CR revision of R5-184178 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#43431 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185439 | Updation of V2X TC 6.6.2.2G.2 |
CR revision of R5-184179 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#43441 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185440 | Updation of V2X TCs 6.5.2.3G.2 and 6.5.2.3G.3 |
CR revision of R5-184180 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#43451 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185441 | TT statements for V2X TCs |
CR revision of R5-184182 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#43471 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185442 | Applicability and ICS for CA RF and RRM test cases | CR | Bureau Veritas, Ericsson LM, KT Corp., Vodafone GmbH, Huawei,HiSilicon, SRTC, KDDI Corporation, SGS Wireless, CGC Inc. | 36.521-2 15.2.0 CR#768 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.3.2.3 |
agreed | [WTS] [JSN] |
R5-185443 | Correction to power level for FR1 RF tests |
CR revision of R5-184486 |
Anritsu | 38.508-1 15.0.0 CR#521 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185444 | Updates of FR1 TRx MU in Annex F |
pCR revision of R5-184392 |
NTT DOCOMO, INC. | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185445 | Update to FR1 test case 6.5.4 Transmit intermodulation |
pCR revision of R5-184479 |
KTL, MTCC | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185446 | Introduction of 6.2C.1 Configured transmitted power for SUL |
pCR revision of R5-184823 |
Huawei, Hisilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185447 | 5G_NR FR1_Text_update for_RX_sensitivity |
pCR revision of R5-184859 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185448 | Corrections to A-MPR values for NS_27 |
CR revision of R5-184799 |
Rohde & Schwarz | 36.521-1 15.2.0 CR#44611 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-185449 | Correction to Figure A.64 to cater for CC >= 3 |
CR revision of R5-184237 |
Anritsu | 36.508 15.2.0 CR#11851 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.1 |
agreed | [WTS] [JSN] |
R5-185450 | Correction to message exception for 8.2.1.4.2_A.4 |
CR revision of R5-184241 |
Anritsu | 36.521-1 15.2.0 CR#43581 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185451 | Editorial correction to RMC name in PHICH demodulation test |
CR revision of R5-184245 |
Anritsu | 36.521-1 15.2.0 CR#43621 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
agreed | [WTS] [JSN] |
R5-185452 | Corrections to CA Test Configuration Table in section 7 |
CR revision of R5-184248 |
Anritsu | 36.521-1 15.2.0 CR#43651 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185453 | Addition of applicability of RRM IncMon test cases |
CR revision of R5-184519 |
Ericsson | 36.521-2 15.2.0 CR#7441 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.5 |
agreed | [WTS] [JSN] |
R5-185454 | Addition of antenna diagrams for IncMon RRM test cases |
CR revision of R5-184502 |
Ericsson | 36.508 15.2.0 CR#11911 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-185455 | Addition of message content for RRM IncMon test cases |
CR revision of R5-184515 |
Ericsson | 36.508 15.2.0 CR#11921 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.4 |
agreed | [WTS] [JSN] |
R5-185456 | TC Group definition for RRM IncMon test cases |
CR revision of R5-184171 |
Ericsson | 36.903 14.1.0 CR#3961 catF | LTE_UTRA_IncMon-UEConTest | Rel-14 |
R5-80 AI: 5.3.1.7 |
agreed | [WTS] [JSN] |
R5-185457 | Addition of RRM IncMon new Test Case 8.4.8 |
CR revision of R5-184589 |
Ericsson | 36.521-3 15.2.1 CR#22661 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185458 | Addition of RRM IncMon new Test Case 8.4.9 |
CR revision of R5-184590 |
Ericsson | 36.521-3 15.2.1 CR#22671 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185459 | Addition of RRM IncMon new Test Case 8.5.8 |
CR revision of R5-184716 |
Ericsson | 36.521-3 15.2.1 CR#22691 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185460 | Addition of RRM IncMon new Test Case 8.6.3 |
CR revision of R5-184717 |
Ericsson | 36.521-3 15.2.1 CR#22701 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185461 | Addition of RRM IncMon new Test Case 8.7.5 |
CR revision of R5-184718 |
Ericsson | 36.521-3 15.2.1 CR#22711 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185462 | Addition of RRM IncMon new Test Case 8.7A.1 |
CR revision of R5-184719 |
Ericsson | 36.521-3 15.2.1 CR#22721 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185463 | Addition of RRM IncMon new Test Cases 4.2.1 and 4.2.11 |
CR revision of R5-184720 |
Ericsson | 36.521-3 15.2.1 CR#22731 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185464 | Addition of RRM IncMon new Test Case 4.3.1.5 |
CR revision of R5-184721 |
Ericsson | 36.521-3 15.2.1 CR#22741 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185465 | Addition of RRM IncMon new Test Case 4.3.2A |
CR revision of R5-184722 |
Ericsson | 36.521-3 15.2.1 CR#22751 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185466 | Addition of RRM IncMon new Test Case 4.3.3A |
CR revision of R5-184723 |
Ericsson | 36.521-3 15.2.1 CR#22761 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185467 | Addition of RRM IncMon new Test Case 4.3.4.4 |
CR revision of R5-184724 |
Ericsson | 36.521-3 15.2.1 CR#22771 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185468 | Discussion on approach for defining EN-DC tests in TS 38.521-3 |
discussion revision of R5-185410 |
Qualcomm Wireless GmbH | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185469 | TP for updating test case 6.2B.3.1 UE AMPR for Intra-band contigous EN-DC |
pCR revision of R5-184757 |
Ericsson LM | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185470 | TP for updating test case 6.2B.3.2 UE AMPR for Intra-band non-contigous EN-DC |
pCR revision of R5-184758 |
Ericsson LM | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185471 | TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC |
pCR revision of R5-184759 revised to R5-185200 |
Ericsson LM | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185472 | Update of TC 6.2B.1.1 |
pCR revision of R5-184826 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185473 | Introduction of TC 6.2B.1.2 |
pCR revision of R5-184827 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185474 | Update of 6.2B.1.3 |
pCR revision of R5-184828 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185475 | Introduction of TC 7.4B.1 |
pCR revision of R5-184829 revised to R5-185201 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185476 | Introduction of 7.4B.2 |
pCR revision of R5-184830 revised to R5-185202 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185477 | Introduction of 7.4B.3 |
pCR revision of R5-184831 revised to R5-185203 |
Huawei, Hisilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185478 | Discussion on OBW, SEM and ACLR for EN-DC interband FR1 |
discussion revision of R5-184852 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185479 | Update Occupied Bandwidth for interband EN-DC within FR1 |
pCR revision of R5-184855 |
Keysight Technologies UK Ltd | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185480 | Update SEM interband EN-DC within FR1 |
pCR revision of R5-184857 |
Keysight Technologies UK Ltd | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185481 | Update ACLR for interband EN-DC within FR1 |
pCR revision of R5-184860 |
Keysight Technologies UK Ltd | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185482 | 5G NR_EN_DC with FR1_Text update for RX sensitivity |
pCR revision of R5-184869 revised to R5-185204 |
Qualcomm Incorporated | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185483 | Editorial corrections 9.1.46 |
CR revision of R5-184103 |
ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#22171 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-185484 | Editorial corrections 9.1.50 |
CR revision of R5-184104 |
ROHDE & SCHWARZ | 36.521-3 15.2.1 CR#22181 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-185485 | Update of RRM IncMon test cases 8.3.7, 8.3.8, 8.3.9, 8.4.7 including test tolerances |
CR revision of R5-184169 |
Ericsson | 36.521-3 15.2.1 CR#22311 catF | LTE_UTRA_IncMon-UEConTest | Rel-15 |
R5-80 AI: 5.3.1.6 |
agreed | [WTS] [JSN] |
R5-185486 | CA_3A-18A and 1A-3A-18A - Updates of A.4.6.3 |
CR revision of R5-184645 |
KDDI Corporation | 36.521-2 15.2.0 CR#7521 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.3 |
withdrawn | [WTS] [JSN] |
R5-185487 | 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission |
pCR revision of R5-184872 revised to R5-185205 |
Qualcomm Incorporated | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185488 | Applicability for DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 |
CR revision of R5-184542 |
SRTC | 36.521-2 15.2.0 CR#7451 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.3 |
withdrawn | [WTS] [JSN] |
R5-185489 | FR2_TxSpurious_TestPointAnalysis |
discussion revision of R5-184371 |
Qualcomm Europe Inc. (Spain) | Rel-15 |
R5-80 AI: 5.3.13.5 |
noted | [WTS] [JSN] | ||
R5-185490 | FR2_TxSpurious_TestConfig_38.521-2 |
pCR revision of R5-184372 |
Qualcomm Europe Inc. (Spain) | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
approved | [WTS] [JSN] |
R5-185491 | Test Point analysis for FR2 TxSpurious test case |
pCR revision of R5-184924 |
Qualcomm Europe Inc. (Spain) | 38.905 0.2.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.16 |
approved | [WTS] [JSN] |
R5-185492 | Quality of Quiet Zone Results for IFF |
other revision of R5-184858 |
Keysight Technologies UK Ltd |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |||
R5-185493 | Correction of test configuration of CA_20A-42A REFSENS |
CR revision of R5-184283 |
Huawei,HiSilicon | 36.521-1 15.2.0 CR#43731 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185494 | Update of 7.3A.5 REFSENS for Rel-13 CA configurations |
CR revision of R5-184284 |
Huawei,HiSilicon | 36.521-1 15.2.0 CR#43741 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185495 | Update of FR1 test case 6.3.3.2 |
pCR revision of R5-184302 |
Huawei,HiSilicon | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185496 | 5G NR_FR1_Text_update for TX Spurious Emission UE-Co-exist |
pCR revision of R5-184867 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185497 | New test case 6.3.5FA.1 Power Control Absolute power tolerance for category NB1 and NB2/Power Class 6 |
CR revision of R5-184403 |
CAICT | 36.521-1 15.2.0 CR#43921 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-185498 | New test case 6.3.5FA.2 Power Control Relative power tolerance for category NB1 and NB2/Power Class 6 |
CR revision of R5-184405 |
CAICT | 36.521-1 15.2.0 CR#43931 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-185499 | New test case 6.3.5FA.3 Aggregate power control tolerance for category NB1 and NB2/Power Class 6 |
CR revision of R5-184406 |
CAICT | 36.521-1 15.2.0 CR#43941 catF | NB_IOTenh-UEConTest | Rel-15 |
R5-80 AI: 5.3.14.3 |
agreed | [WTS] [JSN] |
R5-185500 | 5G NR_Proposal of TS38.521-1 annex C.0_Downlink signal levels |
pCR revision of R5-184920 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185501 | 5G NR_FR1_Text_Update_for_TX_ Additional spurious emissions |
pCR revision of R5-184921 |
Qualcomm Incorporated | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185502 | Addition of new CA band combination – Updates of test points analysis |
CR revision of R5-184838 |
SGS Wireless | 36.905 15.1.0 CR#1561 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17. |
agreed | [WTS] [JSN] |
R5-185503 | Add Clause 7.5B.1 into TS 38.521-3 |
pCR revision of R5-184563 |
CMCC | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185504 | Add Clause 7.5B.2 into TS 38.521-3 |
pCR revision of R5-184564 |
CMCC | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185505 | Add Clause 7.5B.3 into TS 38.521-3 |
pCR revision of R5-184565 |
CMCC | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185506 | Addition of new 3CA band combination for CA REFSENS |
CR revision of R5-184845 |
SGS Wireless | 36.521-1 15.2.0 CR#44731 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-185507 | Addition of 6.2B.4.1.3 Configured OP for Intre-Band within FR1 |
pCR revision of R5-184746 |
Huawei,HiSilicon | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185508 | Introduction of Additional Maximum Power Reduction (A-MPR) for CA (3UL CA) |
CR revision of R5-184841 |
SGS Wireless | 36.521-1 15.2.0 CR#44691 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185509 | Introduction of General ON/OFF time mask for CA (3UL CA) |
CR revision of R5-184843 |
SGS Wireless | 36.521-1 15.2.0 CR#44711 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185510 | Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC |
pCR revision of R5-185302 revised to R5-185206 |
SGS Wireless | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185511 | Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC |
pCR revision of R5-185303 revised to R5-185207 |
SGS Wireless | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185512 | Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 |
pCR revision of R5-185304 revised to R5-185208 |
SGS Wireless | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
revised | [WTS] [JSN] |
R5-185513 | Optimization of test configuration table for Rx CA test cases |
discussion revision of R5-184766 |
NTT DOCOMO, INC. | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.11 |
noted | [WTS] [JSN] | |
R5-185514 | Updates of receiver test cases for CA_XA-YE |
CR revision of R5-184511 |
NTT DOCOMO, INC. | 36.521-1 15.2.0 CR#44081 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-185515 | Updates of receiver test cases for CA_XA-YD |
CR revision of R5-184516 |
NTT DOCOMO, INC. | 36.521-1 15.2.0 CR#44091 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-185516 | Addition of Band 74 information into TS 34.121-1 |
CR revision of R5-184389 |
NTT DOCOMO, INC. | 34.121-1 15.1.0 CR#16561 catF | LTE_FDD_L_band-UEConTest | Rel-15 |
R5-80 AI: 5.3.18.1 |
agreed | [WTS] [JSN] |
R5-185517 | Updates of Band 74 information about Tx test cases in TS 36.521-1 |
CR revision of R5-184390 |
NTT DOCOMO, INC. | 36.521-1 15.2.0 CR#43901 catF | LTE_FDD_L_band-UEConTest | Rel-15 |
R5-80 AI: 5.3.18.3 |
agreed | [WTS] [JSN] |
R5-185518 | Proposal on MU and TT table format in TS 38.521-2 |
discussion revision of R5-184397 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185519 | Updates of FR2 TRx MU and TT in Annex |
pCR revision of R5-184398 |
NTT DOCOMO, INC. | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185520 | Addition of TRx MU and TT in TS 38.521-3 Annex |
pCR revision of R5-184402 |
NTT DOCOMO, INC. | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185521 | OCNG Patterns updated for FR1 tests |
pCR revision of R5-184575 |
Bureau Veritas | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185522 | Update Clause in 6.2.5EA Configured UE transmitted Power for UE category M1 |
CR revision of R5-184098 |
Qualcomm Incorporated | 36.521-1 15.2.0 CR#43381 catF | TEI13_Test, LTE_MTCe2_L1-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2 |
agreed | [WTS] [JSN] |
R5-185523 | FR2_UE_BeamlockMode_IE_38.509 |
CR revision of R5-184908 |
Qualcomm Europe Inc. (Spain) | 38.509 15.0.0 CR#31 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.3 |
agreed | [WTS] [JSN] |
R5-185524 | Introduction of TC 7.6.3 Out-of-band blocking |
pCR revision of R5-184490 |
CAICT | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
approved | [WTS] [JSN] |
R5-185525 | Treatment of power supply cable for FR2 UE tests |
discussion revision of R5-184422 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185526 | Offset in quality of quiet zone evaluation |
discussion revision of R5-184429 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185527 | Testability issue of low PSD test cases in FR2 |
discussion revision of R5-184431 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185528 | Table format correct and removed redundant line for RF clause 7 test cases |
CR revision of R5-184583 |
Bureau Veritas | 36.521-2 15.2.0 CR#7481 catF | TEI8_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-185529 | Test approach of EN-DC Rx tests with multiple LTE/NR CCs |
discussion revision of R5-184485 |
Anritsu | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185530 | Clarification on frame structure in 4Rx performance and CSI test principles sections |
CR revision of R5-184669 |
Qualcomm Wireless GmbH | 36.521-1 15.2.0 CR#44461 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2 |
agreed | [WTS] [JSN] |
R5-185531 | MU and TT of EN-DC test cases in TS 38.521-3 |
discussion revision of R5-184400 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185532 | Proposal for 5G NR EVM Test Tolerance |
discussion revision of R5-184883 |
Qualcomm Incorporated |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |||
R5-185533 | Discussion on UL RMC for FR2 spurious test |
discussion revision of R5-184488 |
Anritsu | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185534 | Discussion on Test Tolerance for FR2 |
discussion revision of R5-184803 |
Intel Corporation (UK) Ltd, Apple Inc. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185535 | Update to General ON/OFF time mask for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions |
CR revision of R5-184658 |
LG Electronics. | 36.521-1 15.2.0 CR#44431 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.3 |
agreed | [WTS] [JSN] |
R5-185536 | Correction of GNSS information for V2X tests |
CR revision of R5-184039 |
Spirent Communications, European Commission | 36.521-3 15.2.0 CR#22121 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
agreed | [WTS] [JSN] |
R5-185537 | CR of CQI reporting test case 9.2.1.1.4.2 |
CR revision of R5-184233 |
Huawei, Hisilicon | 36.521-1 15.2.0 CR#43541 catF | TEI8_Test | Rel-15 |
R5-80 AI: 5.4.1.2.3 |
withdrawn | [WTS] [JSN] |
R5-185538 | Introduction of new test case TC 6.2.5A.4 Configured UE transmitted Output Power for CA (3UL CA) |
CR revision of R5-184601 |
7LAYERS GmbH | 36.521-1 15.2.0 CR#44251 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185539 | Introduction of new test case TC 6.6.2.1A.4 Spectrum emission mask for CA (3UL CA) |
CR revision of R5-184602 |
7LAYERS GmbH | 36.521-1 15.2.0 CR#44261 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185540 | Update of test case TC 6.7A.4 "Transmit intermodulation for CA (3DL CA and 3UL CA)" |
CR revision of R5-184606 |
7LAYERS GmbH | 36.521-1 15.2.0 CR#44291 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.2 |
agreed | [WTS] [JSN] |
R5-185541 | Correction of applicability to TS 36.521-2 for HPUE RF test cases |
CR revision of R5-184336 |
CMCC | 36.521-2 15.2.0 CR#7421 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-185542 | CA_3A-18A - Updates of some Tx test cases |
CR revision of R5-184642 |
KDDI Corporation | 36.521-1 15.2.0 CR#44321 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17.2 |
agreed | [WTS] [JSN] |
R5-185543 | CA_3A-18A - Updates of test points analysis |
CR revision of R5-184641 |
KDDI Corporation | 36.905 15.1.0 CR#1511 catF | LTE_CA_R15-UEConTest | Rel-15 |
R5-80 AI: 5.3.17. |
agreed | [WTS] [JSN] |
R5-185544 | New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes |
CR revision of R5-184868 |
Intel Corporation (UK) Ltd | 36.521-3 15.2.1 CR#22801 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-185545 | New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes |
CR revision of R5-184870 |
Intel Corporation (UK) Ltd | 36.521-3 15.2.1 CR#22811 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-185546 | New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes |
CR revision of R5-184871 |
Intel Corporation (UK) Ltd | 36.521-3 15.2.1 CR#22821 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-185547 | New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes |
CR revision of R5-184873 |
Intel Corporation (UK) Ltd | 36.521-3 15.2.1 CR#22831 catF | LTE_CA_Rel13-UEConTest | Rel-15 |
R5-80 AI: 5.3.2.4 |
agreed | [WTS] [JSN] |
R5-185548 | Band 41 HPUE Maximum Output Power |
CR revision of R5-184335 revised to R5-185185 |
CMCC | 36.521-1 15.2.0 CR#43801 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2 |
revised | [WTS] [JSN] |
R5-185549 | Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2 |
CR revision of R5-184808 |
Intel Corporation (UK) Ltd | 36.521-2 15.2.0 CR#7571 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-185550 | Discussion on testing of fallback CA configurations in Rx CA test cases |
discussion revision of R5-184889 |
Ericsson | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.11 |
noted | [WTS] [JSN] | |
R5-185551 | Discussion paper on the applicability of the tests in 37.571-1 for all types and categories of UE |
discussion revision of R5-184051 |
Spirent Communications, European Commission |
R5-80 AI: 5.5.9 |
noted | [WTS] [JSN] | |||
R5-185552 | Applicability of tests for types and Categories of UE |
CR revision of R5-184083 |
Spirent Communications, European Commission | 37.571-1 15.2.0 CR#2671 catF | TEI12_Test | Rel-15 |
R5-80 AI: 5.5.9 |
agreed | [WTS] [JSN] |
R5-185553 | Proposal for LTE 256QAM EVM Test Tolerance |
discussion revision of R5-184898 |
Qualcomm Incorporated |
R5-80 AI: 5.4.1.2 |
noted | [WTS] [JSN] | |||
R5-185554 | Test tolerance update of V2X uplink timing test cases |
CR revision of R5-184150 |
Qualcomm Europe Inc. (Spain) | 36.521-3 15.2.1 CR#22251 catF | LTE_V2X-UEConTest | Rel-15 |
R5-80 AI: 5.3.12.5 |
agreed | [WTS] [JSN] |
R5-185555 | FR2_UE_BeamlockInvoke_38.521-2 |
pCR revision of R5-184373 |
Qualcomm Europe Inc. (Spain) | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185556 | FR2_UE_BeamlockInvoke_38.521-3 |
pCR revision of R5-184810 |
Qualcomm Europe Inc. (Spain) | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185557 | FR2_UE_BeamlockProcedure_38.508-1 |
CR revision of R5-184909 |
Qualcomm Europe Inc. (Spain) | 38.508-1 15.0.0 CR#851 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.1 |
agreed | [WTS] [JSN] |
R5-185558 | Discussion_38.521-3_ApplicabilityRules |
discussion revision of R5-184361 |
Qualcomm Europe Inc. (Spain) | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | ||
R5-185559 | FR2_38.521-3_Applicability_SpuriousEmissions |
pCR revision of R5-184362 |
Qualcomm Europe Inc. (Spain) | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
withdrawn | [WTS] [JSN] |
R5-185560 | FR2_38.522_Applicability_SpuriousEmissions |
pCR revision of R5-184363 |
Qualcomm Europe Inc. (Spain) | 38.522 0.3.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.8 |
withdrawn | [WTS] [JSN] |
R5-185561 | Discussion_FR2_StoreTxRxBeamPeakCoordinates |
discussion revision of R5-184368 |
Qualcomm Europe Inc. (Spain) | Rel-15 |
R5-80 AI: 5.3.13.5 |
noted | [WTS] [JSN] | ||
R5-185562 | FR2_StoreTxRxBeamPeakCoordinates_38.521-2 |
pCR revision of R5-184369 |
Qualcomm Europe Inc. (Spain) | 38.521-2 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.5 |
approved | [WTS] [JSN] |
R5-185563 | FR2_StoreTxRxBeamPeakCoordinates_38.521-3 |
pCR revision of R5-184370 |
Qualcomm Europe Inc. (Spain) | 38.521-3 0.5.0 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.6 |
approved | [WTS] [JSN] |
R5-185564 | FR1 TT Way Forward update |
discussion revision of R5-184068 |
Telecom Italia S.p.A. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] | |
R5-185565 | Updates of FR1 TRx TT in Annex F |
pCR revision of R5-184395 |
NTT DOCOMO, INC. | 38.521-1 0.5.1 | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.4 |
agreed | [WTS] [JSN] |
R5-185566 | Discussion on TT for Max Output Power TC Requirements for FR2 |
discussion revision of R5-184804 |
Intel Corporation (UK) Ltd, Apple Inc. | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-80 AI: 5.3.13.17 |
noted | [WTS] [JSN] |
1503 documents (1.0734860897064 seconds)