Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R3-142116 | Agenda for RAN3#85bis, Shanghai, China | other | Chairman | R3-85 | - | [WTS] [JSN] | |||
R3-142117 | RAN3#85 Meeting Report, Dresden, Germany | other | MCC | R3-85 | - | [WTS] [JSN] | |||
R3-142118 | TR 30.531, v 1.18.0 | other | MCC | R3-85 | - | [WTS] [JSN] | |||
R3-142119 | Introduction of dual connectivity | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142120 | ProSe UE Authorization in S1AP | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142121 | ProSe authorized indication | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142122 | Introduction of Dual Connectivity (RAN3 topics) | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142123 | Introduction of Dual Connectivity | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142124 | Introduction of Dual Connectivity | CR | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142125 | Introduction of Dual Connectivity | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142126 | Introduction of inter-eNB CoMP signalling | CR | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142127 | Introduction of Dual Connectivity | CR | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142128 | Data Forwarding and Data transmission | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142129 | Enabling Radio Interface based Synchronisation via S1 Signalling | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142130 | Reply LS on the routing information for the Unnecessary HO to another RAT detection (To: RAN3) | other | GERAN2 | R3-85 | - | [WTS] [JSN] | |||
R3-142131 | LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity (To: RAN2,:RAN3, RAN4) | other | RAN1 | R3-85 | - | [WTS] [JSN] | |||
R3-142132 | LS to SA1 on Network Sharing support for access barring (To: SA1; Cc: CT1, RAN3) | other | RAN2 | R3-85 | - | [WTS] [JSN] | |||
R3-142133 | LS on RRM measurement for DC (To: RAN4; Cc: RAN3) | other | RAN2 | R3-85 | - | [WTS] [JSN] | |||
R3-142134 | Reply LS on TAI reporting of last serving cell (To: RAN3) | other | RAN2 | R3-85 | - | [WTS] [JSN] | |||
R3-142135 | LS on introduction of shorter MCH scheduling period (To: SA2, RAN3) | other | RAN2 | R3-85 | - | [WTS] [JSN] | |||
R3-142136 | Reply LS on the impacts of packet marking on RAN user plane handling of DL traffic (To: SA2; Cc: RAN3) | other | RAN2 | R3-85 | - | [WTS] [JSN] | |||
R3-142137 | Reply LS on clarifications about MOCN and GWCN (To: SA5; Cc: RAN3, SA1, SA2) | other | RAN2 | R3-85 | - | [WTS] [JSN] | |||
R3-142138 | Reply LS on SeNB Key Refresh and Counter Check procedures (To: RAN3; Cc: RAN2) | other | SA3 | R3-85 | - | [WTS] [JSN] | |||
R3-142139 | LS on ProSe provisioning parameters (To: CT1, RAN2; Cc: RAN3, SA1, CT6, SA2) | other | RAN1 | R3-85 | - | [WTS] [JSN] | |||
R3-142140 | [DRAFT] Reply LS on allowing optional category indication for LTE (To: CT1; Cc: SA2) | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142141 | Enhanced status reporting for inter-eNB CoMP | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142142 | Further details of the CoMP Hypothesis IE | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142143 | Resolution of remaining open issues for inter-eNB CoMP | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142144 | TP on use cases for Dynamic Spectrum Reallocation | other | Nokia Networks, Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142145 | Further considerations and TP on Dynamic and Semi-Static Spectrum Reallocation | other | Nokia Networks, Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142146 | Open issue resolution of stage 2 overall procedures | other | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142147 | The need for ERAB Modification Failure | other | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142148 | Open issue resolution of flow control | other | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142149 | GTP error handling at SeNB | other | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142150 | Introduction of SeNB Reconfiguration Confirmation for Dual Connectivity | CR | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142151 | Open issue resolution of E-RAB Modification Indication | other | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142152 | Alignment of functional list in TS36.401 | other | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142153 | Introduction of dual connectivity | CR | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142154 | Alignment of functional list in TS36.420 | other | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142155 | Introduction of dual connectivity | CR | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142156 | E-UTRAN X2 interface user plane protocol, v0.2.0 | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142157 | Introduction of further EUL Enhancement | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142158 | Introduction of further EUL Enhancement | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142159 | Information exchanged from WLAN to RAN nodes | other | CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142160 | User experience among different 3GPP RATs | other | CMCC, CATT, Huawei, ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142161 | Intra-3GPP traffic steering | other | CMCC, NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142162 | TR 37.870 Annex update | other | CMCC, CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142163 | TR 37.870 clean up | other | CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142164 | Discussion on reduction of mobility issues due to AAS action | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142165 | Discussion on solutions for RSE | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142166 | Discussion on CoMP open issues | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142167 | Introduction of synchronisation use case for Inter-eNB CoMP | CR | CATT, Samsung, Qualcomm Incorporated | R3-85 | - | [WTS] [JSN] | |||
R3-142168 | 3GPP-WLAN Coordination Scenario and parameters usage | other | CATT, Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142169 | Open Issues for Coordination Involving 3GPP and WLAN | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142170 | Further discussion for dual connectivity procedures | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142171 | Consideration of path switch issue for the UP 1A | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142172 | Consideration on Key refresh procedure | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142173 | Considerations on the flow control | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142174 | Consideration on admission control of DC | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142175 | Correction of SeNB Release procedure | CR | CATT, Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142176 | Discussion on the direct interface between 3GPP and WLAN | other | Huawei, CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142177 | Detecting outcome of RRC re-establishments | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142178 | Adding a re-establishment success indicator to RLF indication | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142179 | RLF report across MME pools | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142180 | Addition of RLF reporting over S1 | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142181 | Addition of RLF reporting over S1 | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142182 | Inter-RAT Mobility Parameters Change Notification | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142183 | Consideration on CoMP hypothesis Definition | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142184 | Consideration on efficient CoMP Information exchange | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142185 | Discussion on open issues of Radio-interface Based Synchronization | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142186 | Further discussion on remaining open issues of flow control | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142187 | TP to solve the remaining issues of flow control | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142188 | Further discussion on open issues in signalling flow | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142189 | TP to solve the open issues in signalling flow | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142190 | Introduction of SeNB Reconfiguration Confirmation Procedure | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142191 | Discussion on E-RAB Modification Indication procedure | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142192 | TP to E-RAB Modification Indication Procedure | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142193 | TP to E-RAB Modification Indication Procedure | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142194 | SeNB Initiated Security Procedure | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142195 | GTP-U Error Indication from SeNB | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142196 | Introduction of 256QAM for PMCH | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142197 | Discussion on 256QAM for PMCH | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142198 | Discussion on allowing optional category for LTE | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142199 | [DRAFT] Reply LS on allowing optional category for LTE (To: CT1; Cc: SA2, SA1) | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142200 | Discussion on the group call congestion management solutions | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142201 | Clarification on maximum bit rate during assignment procedure | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142202 | Clarification on maximum bit rate | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142203 | Enhancements of Inter-RAT handover from E-UTRAN to UTRAN | other | Huawei, Orange | R3-85 | - | [WTS] [JSN] | |||
R3-142204 | Introduction of inter-RAT handover enhancements | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142205 | Corrections on Enhanced Broadcast of System Information | CR | Huawei, Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142206 | Discussion on the interference issue for GSM/LTE semi-static spectrum reallocation | other | Huawei, China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142207 | Discussion on the interference issue for UMTS/LTE semi-static spectrum reallocation | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142208 | Further clarification on the identified parameters for UE throughput estimation in WLAN | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142209 | Additional Information for UE throughput estimation in WLAN | other | Huawei, Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142210 | Monitoring UE throughput in WLAN after offloading | other | Huawei, China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142211 | Unnecessary handover for 3GPP/WLAN Interworking | other | Huawei, China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142212 | Linear scale description on the benefit metric | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142213 | Correction on security functions | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142214 | Discussion on Inter-RAT Information Exchange for semi-static spectrum reallocation | other | Huawei, CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142215 | Considerations on improved HARQ retransmission for HSDPA | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142216 | Introduction of fast HARQ retransmission for HSDPA | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142217 | Introduction of fast HARQ retransmission for HSDPA | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142218 | RAN Aspects of RAN Sharing Enhancements for LTE | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142219 | SON for AAS based deployments | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142220 | Rapporteur’s review | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142221 | Introduction of the increased value range for RSRQ | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142222 | GBR coordination between MeNB and SeNB | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142223 | TP for stage 2 on GBR coordination between MeNB and SeNB | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142224 | TP for stage 3 on GBR coordination between MeNB and SeNB | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142225 | Parallel SCG configuration modification | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142226 | Consideration on SGW relocation | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142227 | Further discussion on Location Update collision with RAB release | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142228 | [DRAFT Alternative 1] Reply LS on location update collision with RAB release (To: CT1; Cc: RAN2) | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142229 | [DRAFT Alternative 2] Reply LS on location update collision with RAB release (To: CT1; Cc: RAN2) | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142230 | Analysis on Group Call eMBMS congestion management | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142231 | Scope of the SON WI in Rel.13 | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142232 | TP on enhancement of 3GPP-WLAN traffic steering | other | Nokia Networks, CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142233 | TP on optimization of eNB/NB broadcast | other | Nokia Networks, CATT, CMCC, Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142234 | Miscellaneous issues to support RIBS | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142235 | Further detail on the required OAM configuration to support RIBS | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142236 | Further Analysis on RNC controlled TTI switching Option | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142237 | Introduce New CFN in RADIO LINK RECONFIGURATION PREPARE message for RNC controlled TTI Switching Option | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142238 | Introduce New CFN in RADIO LINK RECONFIGURATION PREPARE message for RNC controlled TTI Switching Option | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142239 | Treatment of multiple consecutive inter-RAT ping pongs | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142240 | Enabling selection of handover target based on QoS monitoring | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142241 | Enabling post-HO QoS (throughput) monitoring for inter-RAT HOs | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142242 | Enabling post-HO QoS (throughput) monitoring for inter-RAT HOs | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142243 | Enabling post-HO QoS (throughput) monitoring for inter-RAT HOs | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142244 | Comparison between Solution 1 and Solution 2 | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142245 | The study of mobility issues in AAS | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142246 | Inter-eNB CoMP enhancement | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142247 | Enhancement for inter-eNB CoMP signalling | CR | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142248 | Corrections to CoMP stage 3 BL CR | CR | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142249 | Coding structure of CoMP hypothesis | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142250 | Open issues of inter-eNB CoMP | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142251 | Inter-eNB CoMP Invoke indication extension | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142252 | Invoke indication extension for Inter-eNB CoMP | CR | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142253 | Guidance from MeNB for Flow Control | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142254 | Clarification on S-KeNB change triggered by SeNB | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142255 | Correction on 36.425 | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142256 | The Accuracy of the SeNB Counter Check Procedure | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142257 | Open issues in DC stage 3 X2AP BL CR | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142258 | Corrections to DC stage 3 X2AP BL CR | CR | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142259 | Introduction of flow control periodicity on X2 | CR | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142260 | IP address selection | other | ZTE, China Telecom | R3-85 | - | [WTS] [JSN] | |||
R3-142261 | IP address selection | CR | ZTE, China Telecom | R3-85 | - | [WTS] [JSN] | |||
R3-142262 | [DRAFT] LS on MME control for consistence of S1-U and S1-MME address type (To: SA2; Cc: CT4) | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142263 | Cause value for Error Indication | other | ZTE, Alcatel-Lucent, NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142264 | Cause value for Error Indication | CR | ZTE, Alcatel-Lucent, NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142265 | Discussion on the ProSe Authorization Information | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142266 | [DRAFT] LS on the multiple PLMNs for ProSe Authorization (To: SA2; Cc: RAN2) | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142267 | Solution on muting procedure | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142268 | Synchronization acknowledgement indication | CR | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142269 | Selection of IP Version through S1AP CR | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142270 | Selection of IP Version for HeNB behind HeNB GW | CR | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142271 | [DRAFT] Reply LS on Control for Consistence of S1-U and S1-MME Address Type (To: SA2; Cc: CT4) | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142272 | Introduction to the response LS on PWS Category IE | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142273 | [DRAFT] Reply LS on allowing optional category indication for LTE (To: CT1; Cc: SA2, SA1) | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142274 | Introduction to the LS Response on CN Assistance Information | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142275 | [DRAFT] Response LS on Core Network Assisted eNodeB parameters tuning (To: SA2; Cc: RAN2, CT1, CT4) | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142276 | Interaction between MBMS Reset and MBMS Session Start Request | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142277 | Interaction between MBMS Reset and MBMS Session Start Request | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142278 | Interaction between MBMS Reset and MBMS Session Start Request | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142279 | Direct Connection requested by eNB instead of indirect via X2GW | other | Alcatel-Lucent, ZTE, Mitsubishi Electric | R3-85 | - | [WTS] [JSN] | |||
R3-142280 | Direct Connection requested instead of indirect via X2GW | CR | Alcatel-Lucent, ZTE, Mitsubishi Electric | R3-85 | - | [WTS] [JSN] | |||
R3-142281 | Correction of Reloading PWS Alerts after a Restart | other | Alcatel-Lucent, AT&T, One2many | R3-85 | - | [WTS] [JSN] | |||
R3-142282 | Correction of Reloading PWS Alerts after a Restart | CR | Alcatel-Lucent, AT&T, One2many | R3-85 | - | [WTS] [JSN] | |||
R3-142283 | Correction of massive PWS restart indications with HeNBs | other | Alcatel-Lucent, AT&T, One2many | R3-85 | - | [WTS] [JSN] | |||
R3-142284 | Correction of massive PWS Restart indcations with HeNBs | other | Alcatel-Lucent, AT&T, One2many | R3-85 | - | [WTS] [JSN] | |||
R3-142285 | Correction of failed PWS Restart Redundancy for HeNBs | other | Alcatel-Lucent, AT&T, One2many | R3-85 | - | [WTS] [JSN] | |||
R3-142286 | Correction of failed PWS Restart Redundancy for HeNBs | other | Alcatel-Lucent, AT&T, One2many | R3-85 | - | [WTS] [JSN] | |||
R3-142287 | Completion of stage-2 inter-eNB CoMP | other | Qualcomm Incorporated | R3-85 | - | [WTS] [JSN] | |||
R3-142288 | Way Forward on the Remaing stage-3 Open Issues | other | Qualcomm Incorporated | R3-85 | - | [WTS] [JSN] | |||
R3-142289 | Completion of stage-3 inter-eNB CoMP | CR | Qualcomm Incorporated | R3-85 | - | [WTS] [JSN] | |||
R3-142290 | Discussion on Coordination for WLAN Interworking | other | Qualcomm Incorporated | R3-85 | - | [WTS] [JSN] | |||
R3-142291 | CR for shortening MCH sceduling period | CR | ZTE, CMCC, CATR, CATT, Qualcomm, Huawei, HiSilicon, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142292 | [DRAFT] Reply LS on the routing information for the Unnecessary HO to another RAT (To: GERAN2) | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142293 | Correction in the detection of Unnecessary HO to another RAT | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142294 | Correction in the detection of Unnecessary HO to another RAT | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142295 | Correction in the detection of Unnecessary HO to another RAT | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142296 | Further study on Solution 6 | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142297 | Issues in the WI: Enhanced signalling for inter-eNB CoMP | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142298 | Introduction of enhanced inter-eNB CoMP | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142299 | Introduction of enhanced inter-eNB CoMP signalling | CR | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142300 | [DRAFT] Way forward on the WI: Enhanced signalling for inter-eNB CoMP | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142301 | CoMP hypothesis representation | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142302 | Main text for inter-eNB CoMP | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142303 | RRC re-establishment outcome and RLF report reception in MRO | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142304 | MeNB action when UE failure | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142305 | Path Switch Trigger | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142306 | S-KeNB Change triggered by MeNB | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142307 | S-KeNB Change triggered by SeNB | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142308 | Flow Control Buffer Size Reporting | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142309 | Timer definition in Stage 3 | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142310 | Some issues in the X2 interface user plane protocol | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142311 | GTP error Indication returned by SeNB | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142312 | Correction to the transport of UE Radio Capability for Paging | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142313 | Correction to the transport of UE Radio Capability for Paging | CR | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142314 | Summary of email discussion on S1-U and S1-MME address type | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142315 | [DRAFT] Reply LS on MME control for consistence of S1-U and S1-MME address type (To: SA2; Cc: CT4) | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142316 | SON for AAS discussion | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142317 | RLF reporting over S1 | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142318 | Add RLF reporting over S1 | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142319 | Add RLF reporting over S1 | CR | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142320 | Inter-RAT Mobility setting change procedure | other | Samsung, ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142321 | Add inter-RAT Mobility setting change procedure | CR | Samsung, ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142322 | Support of eNB Registration | CR | Samsung, Huawei, ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142323 | The correction of Transport Layer Address | CR | Samsung, China Telecom, ZTE, CATT, LGE, NEC, Qualcomm, Cisco | R3-85 | - | [WTS] [JSN] | |||
R3-142324 | The correction of Transport Layer Address | CR | Samsung, China Telecom, ZTE, CATT, LGE, NEC, Qualcomm, Cisco | R3-85 | - | [WTS] [JSN] | |||
R3-142325 | TNL address selection for HeNB scenario | other | Samsung, China Telecom, ZTE, CATT, LGE, NEC, Qualcomm, Cisco | R3-85 | - | [WTS] [JSN] | |||
R3-142326 | Considerations on signalling flow for AAS issues | other | Fujitsu | R3-85 | - | [WTS] [JSN] | |||
R3-142327 | Discussion on RAN Aspects of RAN Sharing Enhancements for LTE | other | Fujitsu | R3-85 | - | [WTS] [JSN] | |||
R3-142328 | Further discussion on Stage 3 completion for Inter-eNB CoMP | other | Fujitsu | R3-85 | - | [WTS] [JSN] | |||
R3-142329 | Further discussion on X2 Flow Control for Dual Connectivity | other | Fujitsu | R3-85 | - | [WTS] [JSN] | |||
R3-142330 | Correction on MCH transmission | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142331 | RNTP stage 2 – discussion and proposal | other | IAESI | R3-85 | - | [WTS] [JSN] | |||
R3-142332 | RNTP usage and encoding in LTE eCOMP | other | IAESI, CEA, DAC-UPC | R3-85 | - | [WTS] [JSN] | |||
R3-142333 | Reduced signalling overhead | other | IAESI, DAC-UPC, CEA | R3-85 | - | [WTS] [JSN] | |||
R3-142334 | eCoMP Hypothesis with reduced overhead | CR | IAESI, DAC-UPC, CEA | R3-85 | - | [WTS] [JSN] | |||
R3-142335 | RAN Sharing Enhancement: Scope of the WI | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142336 | Per PLMN Specific Mobility Settings Change Procedure enhancement for Stage-2 | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142337 | Enhancing Resource Status Reporting and Initiation procedures | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142338 | Per PLMN Specific Resource Status Update enhancement for Stage-3 | CR | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142339 | Need to enhance Mobility Settings Change Procedure in RAN Sharing Situations | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142340 | Per PLMN Specific Mobility Settings Change Procedure enhancement for Stage-3 | CR | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142341 | Realistic RAN-WLAN Interworking Scenario and Information Exchange | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142342 | UE Throughput Estimation in WLAN | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142343 | Need for IDLE-MODE Load balancing | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142344 | Stage 2 open issues for Dual Connectivity and TP | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142345 | E-RAB Modification Indication open issues and TP | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142346 | UE-AMBR Enforcement for DC | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142347 | TP for SeNB on UE-AMBR : UE-Associated Information – 36.300 | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142348 | TP for SeNB on UE-AMBR : UE-Associated Information – 36.423 | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142349 | Handling of error ocassion in GTP-U for dual connectivity | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142350 | [DRAFT] LS on GTP-U error handling in CN for Dual Connectivity (To: CT4; Cc: SA2) | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142351 | Signalling issues in Inter-eNB CoMP | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142352 | CSI exchange in Inter-eNB CoMP | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142353 | Introduction to the response LS on the routing information for the unnecessary handover to another RAT detection | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142354 | [DRAFT] Response LS on the routing information for the unnecessary handover to another RAT detection (To: GERAN2) | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142355 | Handling of GTP Error Indication (open issue) | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142356 | [DRAFT] Further Response LS on S1-U Tunnel Switch for DC (To: CT4; Cc: SA2) | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142357 | Correction of Reset for Dual Connectivity | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142358 | Correction of Reset for Dual Connectivity | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142359 | Coordination of UE AMBR in Dual Connectivity | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142360 | Coordination of UE AMBR in Dual Connectivity | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142361 | Lack of suitable cause value for handover into Dual Connectivity configuration | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142362 | Handover Cause for Dual Connectivity | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142363 | Correction of SeNB initiated Reconfiguration failure. | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142364 | Correction of SeNB Reconfiguration Failure | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142365 | Text Proposal for Abnormal Condition for the ERAB Modification Indication procedure | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142366 | A MRJC scenario considering multi-mode small cells | other | China Telecom | R3-85 | - | [WTS] [JSN] | |||
R3-142367 | Clarification on assistant information from WLAN | other | China Telecom | R3-85 | - | [WTS] [JSN] | |||
R3-142368 | TR update for Annex A.1 | other | China Telecom | R3-85 | - | [WTS] [JSN] | |||
R3-142369 | Signaling design for CSI reports over X2 | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142370 | Implementation of the NAICS signaling in X2AP | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142371 | X2 support for Network Assisted Interference Cancellation | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142372 | Rapporteur Review | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142373 | Rapporteur Review | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142374 | Rapporteur Review | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142375 | List of issues found during the rapporteur review of TS 36.413 | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142376 | Rapporteur Review | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142377 | Potential issue with Cell Identity definition | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142378 | Introduction of the UL CLTD feedback from the Multiflow assisting serving cell | CR | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | R3-85 | - | [WTS] [JSN] | |||
R3-142379 | Introduction of the UL CLTD feedback from the Multiflow assisting serving cell | CR | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | R3-85 | - | [WTS] [JSN] | |||
R3-142380 | Simple Use Case for Group Call eMBMS Congestion Management | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142381 | Technical proposals for Group Call eMBMS Congestion Management | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142382 | Proposed content of communications with other WGs on Group Call eMBMS Congestion Management | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142383 | Way Forward for Group Call eMBMS Congestion Management | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142384 | [DRAFT] Liaison on Group Call eMBMS Congestion Management (To: CT3, CT4; Cc: CT) | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142385 | Solution for RAN Sharing Overload Scenario | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142386 | Discussion on signalling for enhanced RNTP | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142387 | Potential issue on intra LTE mobility issue due to cell splitting/merging | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142388 | Issues on Invoke Indication Extension | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142389 | Discussion on FFSs on overall procedures | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142390 | Consideration on open issues for Path Switch | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142391 | Stage 2 TP for Path Switch | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142392 | Stage 3 TP for Path Switch | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142393 | Consideration on Key Change/update triggered by SeNB | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142394 | Solutions on avoiding S-GW relocation | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142395 | Discussion on SCG configuration failure | other | LG Electronics | R3-85 | - | [WTS] [JSN] | |||
R3-142396 | On data forwarding for split bearer | other | NTT DOCOMO, INC., Mitsubishi Electric | R3-85 | - | [WTS] [JSN] | |||
R3-142397 | SCG change procedure over X2 | other | NTT DOCOMO, INC. | R3-85 | - | [WTS] [JSN] | |||
R3-142398 | Consideration on Inter-PLMN discovery | other | ETRI | R3-85 | - | [WTS] [JSN] | |||
R3-142399 | LTE/UMTS/WLAN load balancing | other | Intel Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142400 | RAN sharing enhancement for MLB | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142401 | Resource Status Report enhencement | other | ZTE, China Telecom, CMCC, China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142402 | Resource Status Report enhencement | CR | ZTE, China Telecom, CMCC, China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142403 | Resource Status Reporting Initiation and Mobility Settings Change enhencement | CR | ZTE, China Telecom, CMCC, China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142404 | WLAN Offload Parameters Coordination between 3GPP cells | other | ZTE, China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142405 | Coordinated service experience for traffic steering | other | ZTE, CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142406 | Assistance information exchanging for RAN-assisted WLAN interworking | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142407 | Semi-static spectrum re-allocation Support | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142408 | Service experience for traffic steering among 3GPP RATs | other | ZTE, CMCC, China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142409 | Clarification on location report | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142410 | Clarification of Location Report | CR | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142411 | Motivation for New SI: HSPA and LTE Joint Operation | other | China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142412 | Correction X2 interface maintenance procedures | other | DTAG | R3-85 | - | [WTS] [JSN] | |||
R3-142413 | Updated way forward on eMBMS congestion management | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142414 | Analysis of RAN solutions | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142415 | [DRAFT] LS on Group Call eMBMS congestion management for LTE (To: SA2; Cc: CT3, CT4, RAN2) | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142416 | On the encoding of the CoMP Information IE | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142417 | Proposals for eCoMP open issues | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142418 | Introduction of enhanced RNTP and UE-CSI reporting | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142419 | Introduction of signaling for UE-CSI information | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R3-85 | - | [WTS] [JSN] | |||
R3-142420 | X2 support for Network Assisted interference cancellation | other | Mediatek Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142421 | X2 support for Network Assisted interference cancellation | CR | Mediatek Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142422 | [DRAFT] LS on Network Assisted interference cancellation (To: RAN1) | other | Mediatek Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142423 | Proposed concept for eMBMS congestion management | other | Vodafone | R3-85 | - | [WTS] [JSN] | |||
R3-142424 | Review of other proposed solutions | other | Vodafone | R3-85 | - | [WTS] [JSN] | |||
R3-142425 | 3GPP\WLAN coordination for MRO use case | other | Kyocera | R3-85 | - | [WTS] [JSN] | |||
R3-142426 | RAN assistance information for APN traffic steering | other | Kyocera | R3-85 | - | [WTS] [JSN] | |||
R3-142427 | Information exchange between 3GPP RAN and WLAN | other | Kyocera | R3-85 | - | [WTS] [JSN] | |||
R3-142428 | Introduction to ProSe Discovery Range Class | other | ETRI | R3-85 | - | [WTS] [JSN] | |||
R3-142429 | ProSe Discovery Range Class in S1AP | CR | ETRI | R3-85 | - | [WTS] [JSN] | |||
R3-142430 | ProSe Discovery Range Class in X2AP | CR | ETRI | R3-85 | - | [WTS] [JSN] | |||
R3-142431 | Group Call MBMS Congestion Mitigation | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142432 | Discussion on CSI reporting for Inter eNB CoMP | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142433 | On the Encoding of the CoMP Hypothesis IE | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142434 | Solution for encoding of CoMP Hypothesis | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142435 | Solution for Partial Stop of Periodic Measurement Reports for Inter eNB CoMP | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142436 | Remaining Issues on ProSe Authorization Signaling | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142437 | [DRAFT] Reply LS on Introducing the ProSe Authorized IE (To: SA2, RAN2; Cc: RAN, RAN1) | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142438 | Discussion on NAICS assistance information signalling | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142439 | X2 support for Network Assisted Interference Cancellation and Suppression | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142440 | [DRAFT] Reply LS on Rel12 NAICS (To: RAN1, RAN2, RAN4) | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142441 | Interaction between DSR and other Mechanisms | other | Ericsson, Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142442 | WLAN-eNB Load Reporting | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142443 | RAN-WLAN Information Exchange | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142444 | Further applications of the SeNB Modification procedures | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142445 | X2 Confirm message for SCG bearers to trigger Path Switch | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142446 | Remaining stage 2 issues | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142447 | Security Algorithm negotiation for Dual Connectivity | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142448 | Application of the SeNB initiated SeNB Modification procedure for the SCG Change procedure | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142449 | How to set and interpret the “Available buffer size” indication | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142450 | Indicating the frequency of feedback? | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142451 | How to not implement the detection of X2-U losses while being standard compliant | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142452 | Pros and Cons of indicating the “last feedback packet” | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142453 | Shall we introduce X2-U SNs for UL? | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142454 | Handling of GTP-U Error Indication for Dual Connectivity | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142455 | [DRAFT] Response to LS on S1-U tunnel switch for Dual Connectivity (To: CT4, SA2, Cc: CT) | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142456 | Editorials, small corrections and enhancements for the DC X2AP CR | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142457 | Signalling RRC containers within X2 messages | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142458 | SeNB Reconfiguration Complete and RRC re-establishment | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142459 | Applications of the E-RAB Modification Indication procedure | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142460 | Introducing new SIB for Work Item: Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142461 | Enabling Enhanced Radio Interface based Synchronisation via S1 Signalling | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142462 | Discussion and way forward on RIBS signalling enhancements | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142463 | RNC to inform the serving Node B about the TTI switching decision | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142464 | RNC to inform the serving Node B about the TTI switching decision | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142465 | RNC to inform the serving Node B about the TTI switching decision | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142466 | Introduction of configurable buffer occupancy threshold and implicit granting for the secondary UL carrier | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142467 | Introduction of configurable buffer occupancy threshold and implicit granting for the secondary UL carrier | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142468 | Introduction of configurable buffer occupancy threshold and implicit granting for the secondary UL carrier | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142469 | Interpretation issue for the “MaxBitrate” attribute in 25.415 | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142470 | Clarification of Iu UP initialisation for CS Streaming | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142471 | Adding the multiple frequency band indicators | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142472 | Adding the multiple frequency band indicators | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142473 | Potential Backwards Compatibility problem in UL DPCCH Slot Format | other | Ericsson, Qualcomm Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142474 | Signalling for Inter-RAT Mobility Parameters Change Notification | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142475 | Inter-RAT Signalling of Mobility Parameters Change | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142476 | Enhancements to Resource Status Request procedure | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142477 | Enhancements for partial stop of information reporting | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142478 | Solution proposal for MRO RRC re-establishment | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142479 | Interpretation of re-establishment cell in MRO | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142480 | Clarifications of re-establishment cell use in MRO | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142481 | Way Forward on IP Version Signaling and Selection | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142482 | [DRAFT] Reply LS on MME Control for Consistency of S1-U and S1-MME Address Type (To: SA2, Cc: CT4) | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142483 | IP Version Clarification | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142484 | IP Version Clarification | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142485 | IP Version Clarification | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142486 | X2AP Rapporteur Update | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142487 | RNSAP Rapporteur Update | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142488 | LPPa Rapporteur Update | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142489 | RNA Rapporteur Update | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142490 | Update of UTRAN references to 25.921 | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142491 | Response to Discussion on Coordination for WLAN Interworking (R3-142290) | other | Broadcom Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142492 | Response to the Discussion on the direct interface between 3GPP and WLAN (R3-142176, R3-142443) | other | Broadcom Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142493 | Response to R3-142177 and R3-142478 | other | CATT | R3-85 | - | [WTS] [JSN] | |||
R3-142494 | Response to R3-142144 | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142495 | Response to R3-142145 | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142496 | Response to R3-142414 | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142497 | Response to R3-142424 | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142498 | Response to R3-142431 | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142499 | Response document to R3-142218 | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142500 | Response Document to R3-142327 and R3-142339 | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142501 | Response to R3-142414 | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142502 | Response to R3-142424 | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142503 | Response to R3-142431 | other | Motorola Solutions | R3-85 | - | [WTS] [JSN] | |||
R3-142504 | LS on TP for D2D for TS 36.300 (To: RAN2; Cc: RAN3, RAN4) | other | RAN1 | R3-85 | - | [WTS] [JSN] | |||
R3-142505 | Correction X2 interface maintenance procedures | other | DTAG, TeliaSonera, China Telecom, China Unicom, Telecom Italia, AT&T, China Mobile | R3-85 | - | [WTS] [JSN] | |||
R3-142506 | [DRAFT Alternative 2] Reply LS on location update collision with RAB release (To: CT1; Cc: RAN2) | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142507 | Reply LS on location update collision with RAB release (To: CT1; Cc: RAN2) | LS out | RAN3 | R3-85 | - | [WTS] [JSN] | |||
R3-142508 | The correction of Transport Layer Address | CR | Samsung, China Telecom, ZTE, CATT, LGE, NEC, Qualcomm, Cisco, Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142509 | TNL address selection for HeNB scenario | other | Samsung, China Telecom, ZTE, CATT, LGE, NEC, Qualcomm, Cisco, Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142510 | [DRAFT] Reply LS on MME control for consistence of S1-U and S1-MME address type (To: SA2; Cc: CT4) | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142511 | Response LS on Core Network Assisted eNodeB parameters tuning (To: SA2; Cc: RAN2, CT1, CT4) | LS out | RAN3 | R3-85 | - | [WTS] [JSN] | |||
R3-142512 | Updated way forward on eMBMS congestion management | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142513 | Review of other proposed solutions | other | Vodafone | R3-85 | - | [WTS] [JSN] | |||
R3-142514 | Review of other proposed solutions | other | Vodafone | R3-85 | - | [WTS] [JSN] | |||
R3-142515 | Resource Status Report enhencement | other | ZTE, China Telecom, CMCC, China Unicom | R3-85 | - | [WTS] [JSN] | |||
R3-142516 | [DRAFT] LS on Croup Call eMBMS congestion management for LTE (To: SA2; Cc: RAN2) | other | Vodafone | R3-85 | - | [WTS] [JSN] | |||
R3-142517 | Editorials, small corrections and enhancements for the DC X2AP CR | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142518 | Introduction of Dual Connectivity | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142519 | Offline discussion about MeNB action in UE failure | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142520 | TP for SeNB initiated E-RAB List Release (SCG/Split Bearer Release) – 36.423 | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142521 | Introduction of 256QAM for PMCH | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142522 | CR for shortening MCH sceduling period | CR | ZTE, CMCC, CATR, CATT, Qualcomm, Huawei, HiSilicon, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142523 | Further detail on the required OAM configuration to support RIBS | other | Nokia Networks, CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142524 | Update to BL CR to add list of interference cells in the muting request | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142525 | Summary of offline discussion on RIBS | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142526 | Enabling Radio Interface based Synchronisation via S1 Signalling | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142527 | Way Forward for SCE Phy | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142528 | Description of analysed solutions | other | Vodafone | R3-85 | - | [WTS] [JSN] | |||
R3-142529 | [DRAFT] LS on Croup Call eMBMS congestion management for LTE (To: SA2, RAN2) | other | Vodafone | R3-85 | - | [WTS] [JSN] | |||
R3-142530 | Completion of stage-2 inter-eNB CoMP | other | Qualcomm Incorporated, Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142531 | Introduction of inter-eNB CoMP signalling | CR | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142532 | Combined TP on the Coding structure of the CoMP hypothesis | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142533 | Linear scale description on the benefit metric | other | Huawei, Samsung, CATT, IAESI , Ericsson, LG Electronics, NEC, Nokia Networks, ZTE, Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142534 | X2 support for Network Assisted Interference Cancellation | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142535 | User experience among different 3GPP RATs | other | CMCC, CATT, Huawei, ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142536 | [DRAFT] Reply LS on Rel-12 NAICS (To: RAN1, RAN2, RAN4) | other | Mediatek Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142537 | Way forward for the SON WI in Rel.13 | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142538 | RAN sharing Enhancements for LTE Session Report | other | Vice Chairman | R3-85 | - | [WTS] [JSN] | |||
R3-142539 | Way Forward for unnecessary handover | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142540 | [DRAFT] Response LS on the routing information for the unnecessary handover to another RAT detection (To: GERAN2) | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142541 | Session Report: Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | other | Vice Chairman | R3-85 | - | [WTS] [JSN] | |||
R3-142542 | Session Report: Further EUL enhancements | other | Vice Chairman | R3-85 | - | [WTS] [JSN] | |||
R3-142543 | Correction on security functions | CR | Huawei, Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142544 | Way Forward on RAN Sharing Enhancements for LTE | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142545 | Discussion and Way Forward on Signaling ProSe Authorization | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142546 | [DRAFT] Reply LS on Introducing the ProSe Authorized IE (To: SA2, RAN2; Cc: RAN, RAN1) | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142547 | Intra-3GPP traffic steering | other | CMCC, NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142548 | Offline report on MRJC | other | CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142549 | Way Forward on Dual Connectivity | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142550 | X2 support for Network Assisted Interference Cancellation | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142551 | [DRAFT] Reply LS on Rel-12 NAICS (To: RAN1; cc: RAN4, RAN2) | other | Mediatek Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142552 | [DRAFT] Reply LS on Rel-12 NAICS (To: RAN1, RAN4; Cc: RAN2) | other | Mediatek Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142553 | Corrections on Enhanced Broadcast of System Information | CR | Huawei, Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142554 | Correction of abnormal case handling when value 5 is used in UL DPCCH Slot Format | CR | Ericsson, Qualcomm Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142555 | Correction of abnormal case handling when value 5 is used in UL DPCCH Slot Format | CR | Ericsson, Qualcomm Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142556 | Introduction of the UL CLTD feedback from the Multiflow assisting serving cell | CR | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | R3-85 | - | [WTS] [JSN] | |||
R3-142557 | Introduction of the UL CLTD feedback from the Multiflow assisting serving cell | CR | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | R3-85 | - | [WTS] [JSN] | |||
R3-142558 | Adding the multiple frequency band indicators | CR | Ericsson, AT&T | R3-85 | - | [WTS] [JSN] | |||
R3-142559 | CR for shortening MCH sceduling period | CR | ZTE, CMCC, CATR, CATT, Qualcomm, Huawei, HiSilicon, Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142560 | Requirements on a X2 removal procedure | other | DTAG, China Mobile, Telecom Italia, China Unicom, TeliaSonera, China Telecom, AT&T | R3-85 | - | [WTS] [JSN] | |||
R3-142561 | Correction on security functions | CR | Huawei, Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142562 | Correction of Reloading PWS Alerts after a Restart | CR | Alcatel-Lucent, AT&T, One2many | R3-85 | - | [WTS] [JSN] | |||
R3-142563 | X2 support for Network Assisted Interference Cancellation | CR | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142564 | Editorials, small corrections and enhancements for the DC X2AP CR | other | Ericsson, CATT, Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142565 | [DRAFT] Reply LS on Rel-12 NAICS (To: RAN1, RAN4; Cc: RAN2) | other | Mediatek Inc. | R3-85 | - | [WTS] [JSN] | |||
R3-142566 | Reply LS on Rel-12 NAICS (To: RAN1, RAN4; Cc: RAN2) | LS out | RAN3 | R3-85 | - | [WTS] [JSN] | |||
R3-142567 | Summary of Proposals on open issues for Path Update / E-RAB Modification Indication procedure | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142568 | RAN2 status on dual connectivity | other | NTT DOCOMO | R3-85 | - | [WTS] [JSN] | |||
R3-142569 | TP on spectrum reallocation interactions | other | Ericsson, Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142570 | Enhanced text proposal for Data Forwarding and Data transmission | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142571 | Combined TP on the Coding structure of the CoMP hypothesis | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142572 | Solution for Partial Stop of Periodic Measurement Reports for Inter eNB CoMP | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142573 | Extension of Invoke Indication for eCoMP | other | Qualcomm Incorporated, Samsung, ALU, LG Electronics, AT&T, CMCC, KPN, ETRI | R3-85 | - | [WTS] [JSN] | |||
R3-142574 | CoMP Information periodicity | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142575 | Introduction of synchronisation use case for Inter-eNB CoMP | CR | CATT, Samsung, Qualcomm Incorporated, Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142576 | User experience among different 3GPP RATs | other | CMCC, CATT, Huawei, ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142577 | Need for IDLE-MODE Load balancing | other | NEC | R3-85 | - | [WTS] [JSN] | |||
R3-142578 | TP on spectrum reallocation interactions | other | Ericsson, Nokia Networks, CATT, Broadcom Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142579 | TR 37.870 update | other | CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142580 | LS to RAN3 on Introduction of the UL CLTD feedback from the Multiflow assisting cell (To: RAN3) | other | RAN2 | R3-85 | - | [WTS] [JSN] | |||
R3-142581 | Introduction of enhanced inter-eNB CoMP | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142582 | Way forward on the WI: Enhanced signalling for inter-eNB CoMP | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142583 | TP on spectrum reallocation interactions | other | Ericsson, Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142584 | Compromise Proposal: X2AP signalling for SeNB initiated SCG Change | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142585 | Security Algorithm negotiation for Dual Connectivity | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142586 | TP for stage 2 on SCG change indicator | other | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142587 | TP for stage 3 on SCG change indicator | other | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142588 | Clarification on location report | other | ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142589 | Compromise Proposal: X2AP signalling for SeNB initiated SCG Change | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142590 | Introduction of Dual Connectivity | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142591 | TP to clarify the mapping between RRC and X2AP | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142592 | Addition of RLF reporting over S1 | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142593 | Introduction of Dual Connectivity | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142594 | Stage 3 TP on issue 5 for Path Switch | other | LGE | R3-85 | - | [WTS] [JSN] | |||
R3-142595 | TP for Handling of X2U-SN in section 5.4.4.1 of TS 36.425 | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142596 | E-UTRAN X2 interface user plane protocol, v0.3.0 | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142597 | Introduction of Dual Connectivity | CR | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142598 | Introduction of Dual Connectivity | CR | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142599 | Data Forwarding and Data transmission | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142600 | Support of eNB Registration | CR | Samsung, Huawei, ZTE | R3-85 | - | [WTS] [JSN] | |||
R3-142601 | Requirements on a X2 removal procedure | other | DTAG, China Mobile, Telecom Italia, China Unicom, TeliaSonera, China Telecom | R3-85 | - | [WTS] [JSN] | |||
R3-142602 | Response LS on the routing information for the unnecessary handover to another RAT detection (To: GERAN2) | LS out | RAN3 | R3-85 | - | [WTS] [JSN] | |||
R3-142603 | [DRAFT] Reply LS on allowing optional category for LTE (To: CT1; Cc: SA2, SA1) | other | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142604 | The correction of Transport Layer Address | CR | Samsung, China Telecom, ZTE, CATT, LGE, NEC, Qualcomm, Cisco, Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142605 | TNL address selection for HeNB scenario | other | Samsung, China Telecom, ZTE, CATT, LGE, NEC, Qualcomm, Cisco, Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142606 | [DRAFT] Reply LS on MME control for consistence of S1-U and S1-MME address type (To: SA2; Cc: CT4) | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142607 | Solution for Partial Stop of Periodic Measurement Reports for Inter eNB CoMP | other | Ericsson, Samsung, Alcatel Lucent, IAESI | R3-85 | - | [WTS] [JSN] | |||
R3-142608 | Way forward on Multi-RAT Joint coordination | other | CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142609 | Introduction of inter-eNB CoMP signalling | CR | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142610 | [DRAFT] LS on Croup Call eMBMS congestion management for LTE (To: SA2, RAN2) | other | Vodafone | R3-85 | - | [WTS] [JSN] | |||
R3-142611 | LS on Croup Call eMBMS congestion management for LTE (To: SA2, RAN2) | LS out | RAN3 | R3-85 | - | [WTS] [JSN] | |||
R3-142612 | Add RLF reporting over S1 | other | Samsung | R3-85 | - | [WTS] [JSN] | |||
R3-142613 | Updated way forward on eMBMS congestion management | other | Alcatel-Lucent | R3-85 | - | [WTS] [JSN] | |||
R3-142614 | Inter-RAT Signalling of Mobility Parameters Change | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142615 | Way forward for the SON WI in Rel.13 | other | Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142616 | [DRAFT] Reply LS on Introducing the ProSe Authorized IE (To: SA2; Cc: RAN1, RAN2, SA1) | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142617 | Reply LS on Introducing the ProSe Authorized IE (To: SA2; Cc: RAN1, RAN2, SA1) | LS out | RAN3 | R3-85 | - | [WTS] [JSN] | |||
R3-142618 | Discussion and Way Forward on Signaling ProSe Authorization | other | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142619 | TP on spectrum reallocation interactions | other | Ericsson, Nokia Networks, CATT, Broadcom Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142620 | Introduction of SeNB Reconfiguration Confirmation for Dual Connectivity | CR | Nokia Networks, Nokia Corporation | R3-85 | - | [WTS] [JSN] | |||
R3-142621 | Enabling Radio Interface based Synchronisation via S1 Signalling | CR | Ericsson | R3-85 | - | [WTS] [JSN] | |||
R3-142622 | Introduction of 256QAM for PMCH | CR | Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142623 | CR for shortening MCH sceduling period | CR | ZTE, CMCC, CATR, CATT, Qualcomm, Huawei, HiSilicon, Nokia Networks | R3-85 | - | [WTS] [JSN] | |||
R3-142624 | Reply LS on allowing optional category for LTE (To: CT1; Cc: SA2, SA1) | LS out | RAN3 | R3-85 | - | [WTS] [JSN] | |||
R3-142625 | The correction of Transport Layer Address | CR | Samsung, China Telecom, ZTE, CATT, LGE, NEC, Qualcomm, Cisco, Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142626 | TNL address selection for HeNB scenario | other | Samsung, China Telecom, ZTE, CATT, LGE, NEC, Qualcomm, Cisco, Huawei | R3-85 | - | [WTS] [JSN] | |||
R3-142627 | Reply LS on MME control for consistence of S1-U and S1-MME address type (To: SA2; Cc: CT4) | LS out | RAN3 | R3-85 | - | [WTS] [JSN] | |||
R3-142628 | Way forward on Multi-RAT Joint coordination | other | CMCC | R3-85 | - | [WTS] [JSN] | |||
R3-142629 | Way Forward on Dual Connectivity | other | NEC | R3-85 | - | [WTS] [JSN] |
514 documents (1.109790802002 seconds)