Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R2-124370 | other | R2-79 | - | [WTS] [JSN] | |||||
| R2-124371 | Draft report of RAN2 #79, Qingdao, China, 13.08.-17.08.2012 | other | ETSI MCC | R2-79 | - | [WTS] [JSN] | |||
| R2-124372 | Reply LS to SP-120423 = R2-123230 on GSMA Application Network Efficiency Task Force "whitepaper and actions" (S4-121237; contact: Ericsson) | other | SA4 | R2-79 | - | [WTS] [JSN] | |||
| R2-124373 | Reply LS to SP-120423 = R2-123230 on GSMA Application Network Efficiency Task Force "whitepaper and actions" (S5-122172; contact: Alcatel-Lucent) | other | SA5 | R2-79 | - | [WTS] [JSN] | |||
| R2-124374 | Reply LS to SP-120423 = R2-123230 on GSMA Application Network Efficiency Task Force "whitepaper and actions" (RP-121454; contact: Intel) | other | RAN | R2-79 | - | [WTS] [JSN] | |||
| R2-124375 | Reply LS to R2-124345 on EUTRA message in PS HANDOVER COMMAND (GP-121166; contact: NSN) | other | GERAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-124376 | Reply LS to S3-120805 = R2-123228 and C1-123453 = R2-123249 on PWS key distribution (GP-121170; contact: Huawei) | other | GERAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-124377 | LS response to S3-120805 = R2-123228 on PWS key distribution (R3-121966; contact: Huawei) | other | RAN3 | R2-79 | - | [WTS] [JSN] | |||
| R2-124378 | LS on LTE Rel-11 UE feature list (R1-124007; contact: NTT DOCOMO) | other | RAN1 | R2-79 | - | [WTS] [JSN] | |||
| R2-124379 | LS on LTE Rel-11 UE capabilities list (R4-124372; contact: NTT DOCOMO) | other | RAN4 | R2-79 | - | [WTS] [JSN] | |||
| R2-124380 | Reply LS to R1-124007 = R2-124378, R2-124352, R4-124372 = R2-124379 on RAN1/2/4 input about Rel-11 LTE UE capabilities (RP-121457; contact: NTT DOCOMO) | other | RAN | R2-79 | - | [WTS] [JSN] | |||
| R2-124381 | LS on additional information in RLF report for inter RAT MRO (R3-122016; contact: Huawei) | other | RAN3 | R2-79 | - | [WTS] [JSN] | |||
| R2-124382 | LS on ES Probing (R3-122019; contact: Ericsson) | other | RAN3 | R2-79 | - | [WTS] [JSN] | |||
| R2-124383 | Reply LS to R1-123044 on UE measurements in support of the two-stage MIMO OTA test method (R4-125009; contact: Nokia) | other | RAN4 | R2-79 | - | [WTS] [JSN] | |||
| R2-124384 | LS on "Initial Attach and Routing Area Update procedures for UMTS/LTE capable UEs in Release 8" (R5-123782; contact: Fujitsu) | other | RAN5 | R2-79 | - | [WTS] [JSN] | |||
| R2-124385 | Reply LS to S2-122624 = R2-123225 on Capability Indicator for SRVCC from UTRAN/GERAN to E-UTRAN/HSPA (GP-121163; contact: Huawei) | other | GERAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-124386 | LS on reporting the UE E-UTRAN Capabilities for rSRVCC from GERAN to E-UTRAN (GP-121171; contact: Huawei) | other | GERAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-124387 | LS response to S2-123426 = R2-123239 on IMS information Notification for CS to PS SRVCC (R3-122010; contact: Huawei) | other | RAN3 | R2-79 | - | [WTS] [JSN] | |||
| R2-124388 | Reply LS to S2-123426 = R2-123239, C1-123376 = R2-123247, R3-122010 = R2-124387 on Notification of IMS Information for CS to PS SRVCC (GP-121181; contact: Renesas) | other | GERAN | R2-79 | - | [WTS] [JSN] | |||
| R2-124389 | LS response to S2-123370 = R2-123235 on contents of Handover Required message for rSRVCC (R3-121963; contact: Huawei) | other | RAN3 | R2-79 | - | [WTS] [JSN] | |||
| R2-124390 | Reply LS to S2-123370 = R2-123235 on contents of Handover Required message for rSRVCC (GP-121164; contact: Huawei) | other | GERAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-124391 | LS on RRC parameters needed for Rel-11 (R1-124021; contact: Alcatel-Lucent) | other | RAN1 | R2-79 | - | [WTS] [JSN] | |||
| R2-124392 | LS on parallel transmission of SRS and PUSCH/PUCCH for multiple TAGs (R1-124027; contact: Panasonic) | other | RAN1 | R2-79 | - | [WTS] [JSN] | |||
| R2-124393 | LS Response to R2-123140 on Status on CA enhancement (R4-124986; contact: Ericsson) | other | RAN4 | R2-79 | - | [WTS] [JSN] | |||
| R2-124394 | Response LS to R1-123058 = R2-123208 on MIB detection in FeICIC (R4-124804; contact: Huawei) | other | RAN4 | R2-79 | - | [WTS] [JSN] | |||
| R2-124395 | LS on Service Area and Frequency Info in USD (S4-121219; contact: Ericsson) | other | SA4 | R2-79 | - | [WTS] [JSN] | |||
| R2-124396 | LS on extending E-UTRA band number and EARFCN numbering space (R4-124948; contact: CMCC) | other | RAN4 | R2-79 | - | [WTS] [JSN] | |||
| R2-124397 | LS on RAN1 agreements on Four Branch MIMO transmission for HSDPA (R1-124013; contact: Huawei) | other | RAN1 | R2-79 | - | [WTS] [JSN] | |||
| R2-124398 | LS on RAN1 agreements on MIMO with 64QAM for HSUPA (R1-124014; contact: NSN) | other | RAN1 | R2-79 | - | [WTS] [JSN] | |||
| R2-124399 | Draft report of RAN2 #79, Qingdao, China, 13.08.-17.08.2012 | other | ETSI MCC | R2-79 | - | [WTS] [JSN] | |||
| R2-124400 | Dedicated priority storage | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124401 | Parallel transmissions of SRS and PUSCH/PUCCH in different TAGs | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124402 | Email discussion report on [79#34] [LTE/COMP] CoMP Open issues | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124403 | Modification of Exclusion of Pre-Redirection info in RRC_CON_REQ message | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124404 | Report of email discussion [79#33] [LTE/IDC] IDC open issues | other | Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-124405 | Addition of the stage-2 agreements on IDC | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124406 | Addition of the stage-3 agreements on IDC | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124407 | Correction to ACK-NACK repetition factor for Multiflow assisting cells | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124408 | Discussion on Multiflow and CLTD | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124409 | Introduction of Multiflow and CLTD | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124410 | MAC-hs reset issue for Multiflow mobility | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124411 | Correction to MAC-hs reset procedure for Multiflow | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124412 | The necessity of access control in RRC_CONNECTED | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124413 | Draft reply LS on Inter RAT handover, Inter RAT Release with redirection, Inter RAT Reject with redirection between E-UTRAN and UTRAN | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124414 | Introduction of further Multiflow agreements in TS 25.308 | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124415 | Introduction of further Multiflow agreements in TS 25.322 | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124416 | Out-of-sync detection and handling in HSDPA Multiflow | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124417 | Introduction of the extended out-of-sync configuration for Multiflow | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124418 | Introduction of the extended out-of-sync configuration for Multiflow | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124419 | Time drift in HSDPA Multiflow | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124420 | Combination of DL HSDPA Multiflow with UL CLTD | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124421 | Inactivity Timer Expiry and Short DRX Cycle | other | Nokia Siemens Networks, Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124422 | Congestion Handling for MBMS | other | Nokia Siemens Networks, Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124423 | IDC Considerations for MDT | other | Nokia Siemens Networks, Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124424 | IDC and CA | other | Nokia Siemens Networks, Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124425 | Adding the capability of supporting MAC-ehs window size extension | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124426 | Consideration on RF Receiver Specific AG Operation | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124427 | Introduction of RF receiver specific AG operation | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124428 | Further Battery Saving for Small Data Transmission in Cell_FACH state | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124429 | MAC level SRB Bi-casting | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124430 | Consideration on 3G ANR enhancement | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124431 | Extending the PPI idea to HSPA+ | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124432 | Adding the capability of supporting MAC-ehs window size extension | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124433 | Adding the capability of supporting MAC-ehs window size extension | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124434 | Cell individual offset (CIO) for inter-RAT measurement events | other | Nokia Siemens Networks, Nokia Corporation, Deutsche Telekom | R2-79 | - | [WTS] [JSN] | |||
| R2-124435 | CR to 36.331 on cell individual offset (CIO) for inter-RAT measurement events | other | Nokia Siemens Networks, Nokia Corporation, Deutsche Telekom | R2-79 | - | [WTS] [JSN] | |||
| R2-124436 | Corrections to Scheduled IP Throughput for MDT in DL | other | Nokia Siemens Networks, LG Electronics | R2-79 | - | [WTS] [JSN] | |||
| R2-124437 | CR to 36.314 on Scheduled IP Throughput for MDT in DL | other | Nokia Siemens Networks, LG Electronics | R2-79 | - | [WTS] [JSN] | |||
| R2-124438 | Consideration on returning from GERAN/UTRAN to E-UTRAN following CS | other | CMCC | R2-79 | - | [WTS] [JSN] | |||
| R2-124439 | Consideration the impact of DRX to handover | other | China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124440 | Consideration on Event-triggered reporting for Immediate MDT in UMTS | other | China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124441 | Downlink out-of-sync and Radio Link Failure in multiflow transmission | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R2-79 | - | [WTS] [JSN] | |||
| R2-124442 | Discussion on the open issues of PPI in CR for TS36.331 | other | China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124443 | Progress of Scenarios and Requirements of Small Cell Enhancements | other | CMCC | R2-79 | - | [WTS] [JSN] | |||
| R2-124444 | Considerations on Remaining Issues for Power Preference Indication | other | China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124445 | Consideration on UL suspend MAC CE | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124446 | Clarification to the handling of IE Different Tx diversity mode configuration from serving HS-DSCH cell | other | Broadcom Corporation, Renesas Mobile Europe Ltd | R2-79 | - | [WTS] [JSN] | |||
| R2-124447 | Clarification on NAS PDU Delivery | other | Nokia Siemens Networks, Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124448 | UE behavior discrepancy upon link failure and ongoing re-configuration | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124449 | Clarification on Standalone NAS PDU delivery | other | Nokia Siemens Networks, Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124450 | Clarification on HandoverCommand message | other | Nokia Siemens Networks, Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124451 | Removing UE behavior discrepancy upon radio link failure and ongoing re-configuration | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124452 | RAN overload handling using RRC Reject | other | Nokia Siemens Networks, Nokia Corporation, Alcatel-Lucent, Ericsson, ST Ericsson, Verizon, Vodafone, Intel Corporation, MediaTek Inc, Qualcomm Incorporate, LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124453 | Consideration on UE behaviour on activation / de-activation of Common E-DCH in SIB5 | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124454 | Way forward for coding of uncertainty and confidence IE | other | NTT DOCOMO. INC., Ericsson, ST-Ericsson, Samsung, NEC | R2-79 | - | [WTS] [JSN] | |||
| R2-124455 | CR for coding of uncertainty and confidence for MDT | other | NTT DOCOMO. INC., Ericsson, ST-Ericsson, Samsung, NEC | R2-79 | - | [WTS] [JSN] | |||
| R2-124456 | Draft Response LS to Inter frequency search for configured frequency(ies) without compressed mode | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124457 | Reporting CGI of a GERAN cell | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124458 | Measurements interruption upon reportCGI configuration | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124459 | Introduction of Further Enhancements to CELL_FACH in 25.304 | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124460 | Adjustment of time advance when TAT is not running | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124461 | Introduction of Further Enhancements to CELL_FACH in 25.306 | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124462 | Clarification of the Note in 5.2 | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124463 | Introduction of Further Enhancements to CELL_FACH in 25.321 | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124464 | Introduction of Further Enhancements to CELL_FACH in 25.331 | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124465 | Open issues related to NodeB triggered HS-DPCCH in FE-FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124466 | Open issues related to Fallback to R99 PRACH in FE-FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124467 | The eNB Capability indication | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124468 | RB index indication on the IDC indication | other | Research In Motion UK Limited, NEC | R2-79 | - | [WTS] [JSN] | |||
| R2-124469 | Open issues related to TTI alignment and Per HARQ process grants in FE-FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124470 | Prohibit Mechanism with timer and counter for IDC indication | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124471 | Open issues related to Common E-RGCH based interference control in FE-FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124472 | Remaining Signaling Issues for the IDC operation | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124473 | Open issues related to Second DRX in FE-FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124474 | Open issues related to certain UE capabilities in FE-FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124475 | On PRACH preamble parameter selection for UE's not supporting concurrent 2ms and 10ms in FE-FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124476 | Monitoring the Paging Indicator channel in CELL_FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124477 | UE requirements for determination of Common E-RGCH Radio Link(s) in FE-FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124478 | On UE request to enable and disable CLTD | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124479 | MAC Layer aspects of UL MIMO | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124480 | Informing RRC Idle UE of potential congestion in MBMS Service Continuity | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124481 | Small clarification in 36.300 for MBMS | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124482 | Clarification on aperiodic CQI transmission | other | Nokia Corporation, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124483 | Clarification on aperiodic CQI transmission | other | Nokia Corporation, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124484 | CRS interference handling in feICIC | other | Fujitsu | R2-79 | - | [WTS] [JSN] | |||
| R2-124485 | Further consideration on the timeline of IDC | other | Fujitsu | R2-79 | - | [WTS] [JSN] | |||
| R2-124486 | IDC and s-Measure | other | Fujitsu | R2-79 | - | [WTS] [JSN] | |||
| R2-124487 | Consideration on UL suspension command | other | Fujitsu | R2-79 | - | [WTS] [JSN] | |||
| R2-124488 | IDC and s-Measure | other | Fujitsu | R2-79 | - | [WTS] [JSN] | |||
| R2-124489 | Clarification to measurement rules for inter-Freq&RAT layers without absolute priority being assigned | other | ZTE, Alcatel-Lucent, CATT, China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124490 | Transmission of System Information besides SIB1 | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124491 | Discussion on Extending E-UTRA Band Number and EARFCN Numbering Space | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124492 | Extension of E-UTRA Band Number | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124493 | Discussion on the Enhancement of TA Acquisition for E-CID | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124494 | Supporting the Enhancement of TA Acquisition for E-CID | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124495 | Power Management Indicator in PHR | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124496 | Power Management Indicator in PHR | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124497 | Clarification of SR period | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124498 | Clarification of UE Capabilities and Measurement descriptions for MDT Enhancement | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124499 | Update of UE Accessibility Measurement Capability | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124500 | Correction on the Descriptions of Accessibiility Measurement | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124501 | Correction on the Descriptions of Accessibiility Measurement | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124502 | Signaling Design for Uncertainty and Confidence of Location | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124503 | Correction of the signaling for Uncertainty and Confidence | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124504 | Remove the description for IE 'confidence' in 25.331 | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124505 | Interaction of Tb and Tbhs Timer in CELL_FACH | other | Ericsson, ST-Ericsson, China Unicom, ZTE | R2-79 | - | [WTS] [JSN] | |||
| R2-124506 | PRACH scrambling code handling for Further Enhanced CELL_FACH | other | Ericsson, ST-Ericsson, China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124507 | CR to 36.331 on SIB15 acquisition | other | ASUSTeK | R2-79 | - | [WTS] [JSN] | |||
| R2-124508 | CR to 36.331 on ASN.1 corrections | other | ASUSTeK | R2-79 | - | [WTS] [JSN] | |||
| R2-124509 | Updated MIB Acquisition | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124510 | Clarification on PUCCH resource configuration | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124511 | Clarification on PUCCH resource configuration | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124512 | Physical parameters for CA-enhancements | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124513 | CR on physical parameters for CA-enhancements | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124514 | Physical parameters for ePDCCH | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124515 | MBMS Interest Indication based on changes in MBMS/Unicast priority | other | Kyocera, Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124516 | CR on physical parameters for ePDCCH | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124517 | Correction related to differentiating UTRAN modes in FGIs | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124518 | Introduction of parallel SRS and PUSCH/PUCCH transmission for multiple TAGs | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124519 | Corrections related to CA | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124520 | Correction related to differentiating UTRAN modes in FGIs | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124521 | Correction related to differentiating UTRAN modes in FGIs | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124522 | Clarification on the impact of different TDD configurations | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124523 | Lossless handover involving Short-to-Long PDCP SN reconfiguration | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124524 | Lossless handover involving Short-to-Long PDCP SN reconfiguration | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124525 | Inter-RAT cell reselection from LTE to UMTS | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124526 | Lossless handover involving Short-to-Long PDCP SN reconfiguration | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124527 | CR on cell reselection from LTE to UMTS | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124528 | Introduction of EPDCCH in MAC | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124529 | Redirection from UMTS to LTE | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124530 | Clarification on the contention resolution of RA procedure | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124531 | PDCP SN Allocation | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124532 | CR on redirection from UMTS to LTE | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124533 | Preventing CSI/SRS transmission in case of long TAT | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124534 | SRS reporting for UL transmission | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124535 | CR on redirection from UMTS to LTE | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124536 | RLF report enhancement for inter-RAT MRO | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124537 | CR to 36.331 on RLF report enhancement for inter-RAT MRO | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124538 | Clarification on PCell SIB15 | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124539 | Clarification on MCCH-Message Acquisition | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124540 | Discussion on PPI prohibit timer | other | Pantech | R2-79 | - | [WTS] [JSN] | |||
| R2-124541 | Initial PPI procedure consideration | other | Pantech | R2-79 | - | [WTS] [JSN] | |||
| R2-124542 | Change of PDCCH subframe due to CCS configuration | other | Pantech | R2-79 | - | [WTS] [JSN] | |||
| R2-124543 | Discussion on TA validity due to deactivation of SCells in sTAG and repeaters | other | Pantech | R2-79 | - | [WTS] [JSN] | |||
| R2-124544 | Acquisition of power preference indication upon handover | other | CATT, MediaTek, ZTE, CMCC | R2-79 | - | [WTS] [JSN] | |||
| R2-124545 | Discussion on UL transmission handling for UE power saving | other | Pantech | R2-79 | - | [WTS] [JSN] | |||
| R2-124546 | Clarification of FDM avoidance scheme on IDC | other | Pantech, LG Electronics Inc | R2-79 | - | [WTS] [JSN] | |||
| R2-124547 | The UE capability information for IDC | other | Pantech, Research In Motion UK limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124548 | Report of email discussion [79#36] on ncc-Permitted coding | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124549 | IDC triggering on LTE UL frequency | other | Pantech | R2-79 | - | [WTS] [JSN] | |||
| R2-124550 | Prohibit mechanism to prevent unnecessary IDC assistance information | other | Pantech | R2-79 | - | [WTS] [JSN] | |||
| R2-124551 | Omitting featureGroupIndicators | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124552 | RLF declaration during IDC acquistion Phase 2 | other | Pantech | R2-79 | - | [WTS] [JSN] | |||
| R2-124553 | Omitting featureGroupIndicators | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124554 | TDM pattern per band | other | Pantech | R2-79 | - | [WTS] [JSN] | |||
| R2-124555 | Omitting featureGroupIndicators | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124556 | The positioning uncertainty and confidence information for MDT | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124557 | Omitting featureGroupIndicators | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124558 | The positioning uncertainty and confidence information for MDT | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124559 | ISM denial for ETWS/CMAS notifications | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124560 | On the UE capabilities of Rel11 features | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124561 | Acquisition of power preference indication upon handover | other | CATT, MediaTek, ZTE, CMCC | R2-79 | - | [WTS] [JSN] | |||
| R2-124562 | Acquisition of power preference indication upon handover | other | CATT, MediaTek, ZTE, CMCC | R2-79 | - | [WTS] [JSN] | |||
| R2-124563 | Discussion on Power Preference Indication (PPI) Initiation | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124564 | Clarification of UEAssistanceInformation Reporting | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124565 | Introducing additional information in RLF Report for REL-11 inter-rat MRO | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124566 | Corrections to intra-UTRAN SR-VCC handover procedure | other | Intel Corporation, Renesas Mobile Europe Ltd | R2-79 | - | [WTS] [JSN] | |||
| R2-124567 | Clarification to logging of PLMN identity in ANR | other | Intel Corporation, TeliaSonera, ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124568 | P-MPR usage for IDC | other | Panasonic | R2-79 | - | [WTS] [JSN] | |||
| R2-124569 | Corrections to Inter-frequency detected set measurements | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124570 | explicit control of periodic CSI/SRS reporting | other | Panasonic | R2-79 | - | [WTS] [JSN] | |||
| R2-124571 | Periodic CSI/SRS enabling/disabling MAC CE | other | Panasonic | R2-79 | - | [WTS] [JSN] | |||
| R2-124572 | Overload Control by RRC Connection Release | other | Panasonic | R2-79 | - | [WTS] [JSN] | |||
| R2-124573 | SFN Synchronization and f-eICIC capability | other | Panasonic | R2-79 | - | [WTS] [JSN] | |||
| R2-124574 | Out Of Sync and Radio Link Failure for Multiflow | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124575 | Introduction of additional values for DeltaACK and DeltaNACK | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124576 | NW failure and UE reselection | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, ST-Ericsson, Alcatel-Lucent, Verizon, Vodafone, Intel Corporation, Qualcomm Incorporated, Mediatek Inc., LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124577 | Carrier Aggregation Enhancement RAN1 parameters | other | Nokia Corporation, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124578 | Carrier Aggregation Enhancement RAN1 parameters | other | Nokia Corporation, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124579 | Paging and CSI-RS | other | Nokia Corporation, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124580 | CR for inter-RAT/Inter-frequency ANR | other | Texas Instruments | R2-79 | - | [WTS] [JSN] | |||
| R2-124581 | REL11 UE EUTRA capabilities | other | Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124582 | Clarification on DRX for Relay | other | ASUSTeK, CATT, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124583 | Clarification on DRX for Relay | other | ASUSTeK, CATT, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124584 | FDD/ TDD differentiation for Rel-11 UE capabilities | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124585 | The Active Time upon sending an SR with different TDD UL-DL configurations | other | ASUSTeK | R2-79 | - | [WTS] [JSN] | |||
| R2-124586 | Discussion on Stop Reporting CSI-SRS through MAC CE | other | ASUSTeK | R2-79 | - | [WTS] [JSN] | |||
| R2-124587 | CR to 36.321 on introduction of UL suspend Command MAC CE | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124588 | Handling of the roaming subscribers | other | Vodafone | R2-79 | - | [WTS] [JSN] | |||
| R2-124589 | Inter-RAT Treselection enhancement | other | TeliaSonera, Deutsche Telekom | R2-79 | - | [WTS] [JSN] | |||
| R2-124590 | Inter-RAT Treselection enhancement | other | TeliaSonera, Deutsche Telekom | R2-79 | - | [WTS] [JSN] | |||
| R2-124591 | On absolute priority cell reselection | other | TeliaSonera | R2-79 | - | [WTS] [JSN] | |||
| R2-124592 | Correction to absolute priority cell reselection | other | TeliaSonera | R2-79 | - | [WTS] [JSN] | |||
| R2-124593 | Correction to absolute priority cell reselection | other | TeliaSonera | R2-79 | - | [WTS] [JSN] | |||
| R2-124594 | Cell reselection evaluation on RSCP and EC/N0 | other | TeliaSonera | R2-79 | - | [WTS] [JSN] | |||
| R2-124595 | Cell reselection evaluation on RSCP and EC/N0 | other | TeliaSonera | R2-79 | - | [WTS] [JSN] | |||
| R2-124596 | Clarification of DRX for Relay | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124597 | Clarification of DRX for Relay | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124598 | MDT Open Issues Resolutions | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124599 | UMTS Accessibility Measurements | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124600 | UMTS Accessibility Measurements Open Issues | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124601 | MDT Stage-2 open issues | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124602 | MDT Non RAN2 parameters open issues | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124603 | Draft LS on further MDT agreements in RAN2 | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124604 | eDDA Open Issues | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124605 | CR on stop reporting CSI-SRS through MAC CE | other | ASUSTeK | R2-79 | - | [WTS] [JSN] | |||
| R2-124606 | PWS with security in Rel-12 | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124607 | On FFS for UE assistance for power preference | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124608 | Inter-frequency measurements without CM for multi-carrier | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124609 | Way forward on fast dormancy issue | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124610 | Corrections to HS-DSCH DRX operation with second DRX cycle | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124611 | Corrections to HS-DSCH DRX operation with second DRX cycle | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124612 | ASN.1 Ad-Hoc Meetings in January 2013 | other | RAN2 Chairman (Ericsson) | R2-79 | - | [WTS] [JSN] | |||
| R2-124613 | Processing delay for RRCConnectionReconfiguration | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124614 | On Dedicated Signalling of SIB1 | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124615 | On Dedicated Signalling of SIB1 | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124616 | Capturing intra- and inter-frequency, and inter-RAT event triggered measurements in UMTS for MDT | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124617 | Draft reply LS on MIB detection in feICIC | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124618 | Capturing intra- and inter-frequency, and inter-RAT event triggered measurements in UMTS for MDT | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124619 | UE Behaviour related to CSG support | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124620 | Support of CSG | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124621 | Discussion on extension of band and ARFCN | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124622 | Extension of band and ARFCN | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124623 | Extension of band and ARFCN | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124624 | Draft reply LS on extending E-UTRA band number and EARFCN numbering space | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124625 | Clarifications to CSG support in TS 45.008 | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124626 | Consideration on stopping CSI/SRS transmission | other | ITRI | R2-79 | - | [WTS] [JSN] | |||
| R2-124627 | Remaining Issues of Power Preference Indication | other | ITRI | R2-79 | - | [WTS] [JSN] | |||
| R2-124628 | Discussion on provisioning of dedicated SIB1 signalling | other | ITRI | R2-79 | - | [WTS] [JSN] | |||
| R2-124629 | On bursts of MBMS interest indications | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124630 | Planning of the Rel-11 RRC message and ASN.1 review for UTRA | other | Ericsson (Rapporteur) | R2-79 | - | [WTS] [JSN] | |||
| R2-124631 | On bursts of MBMS interest indications | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124632 | Editorial corrections for 25.331 RRC specification | other | Ericsson (Rapporteur) | R2-79 | - | [WTS] [JSN] | |||
| R2-124633 | Correction to parallel PRACH, SRS and PUSCH/PUCCH transmission | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124634 | Periodic CSI and SRS at DRX state change | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124635 | Clarification on Validity of EAB SIB | other | ITRI | R2-79 | - | [WTS] [JSN] | |||
| R2-124636 | Periodic CSI and SRS at DRX state change | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124637 | Change PDCP SN length at handover | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124638 | Change PDCP SN length at handover | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124639 | Change PDCP SN length at handover | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124640 | Stop RACH Transmission on a deactivated SCell | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124641 | Overallocation of PDCP SN | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124642 | Overallocation of PDCP SN | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124643 | Discussion on introducing CoMP in 36331 | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124644 | Introducing support for Coordinated Multi-Point (CoMP) operation in DL | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124645 | Handling of OtherConfig | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124646 | Introducing common UE assistance procedure | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124647 | Further changes regarding In-Device Coexistence | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124648 | Further changes regarding Power Preference Indication | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124649 | Overallocation of PDCP SN | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124650 | Miscellaneous corrections | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124651 | Review in preparation of REL-11 ASN.1 freeze | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124652 | Additional ways of stopping SRS | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124653 | Timing Advance value initialization | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124654 | Processing delay for RRCConnectionReconfiguration | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124655 | Extending E-UTRA Frequency Band and EARFCN value range | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124656 | Report on email discussion 79#30 CRs on Multiple Frequency Band Indicators | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124657 | Definition of M3 (RIP) measurement | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124658 | Correction of M3 (RIP) measurement definition for LTE | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124659 | Additional information in RLF report for inter RAT MRO | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124660 | On performance of ROHC context transfer | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124661 | MAC Layer aspects and UE categories for UL MIMO with 64QAM | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124662 | Introduction of 4Tx-HSDPA in 25.306 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124663 | Introduction of 4Tx-HSDPA in 25.321 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124664 | Introduction of 4Tx-HSDPA in 25.302 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124665 | Introduction of 4Tx-HSDPA in 25.331 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124666 | Introduction of MIMO with 64QAM HSUPA in 25.306 | other | Ericsson, ST-Ericsson, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124667 | Further considerations on size of Cell Update message | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124668 | UE behaviour for missing E-RNTI for Common E-DCH operation | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124669 | MAC layer support of half-duplex UEs in TDD inter-band CA | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124670 | UE behavior at activation/deactivation of Enhanced Uplink in CELL_FACH state in SIB5 | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124671 | UE behavior at activation/deactivation of Enhanced Uplink in CELL_FACH state in SIB5 | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124672 | UE behavior at activation/deactivation of Enhanced Uplink in CELL_FACH state in SIB5 | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124673 | UE behavior at activation/deactivation of Enhanced Uplink in CELL_FACH state in SIB5 | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124674 | On remaining issues for NW controlled mobility in FE-FACH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124675 | On radio link out-of-sync handling in MF-HSDPA | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124676 | Handling of cells timing for eSCC during MultiFlow HSDPA | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124677 | E-TFC selection for HSUPA MIMO | other | InterDigital | R2-79 | - | [WTS] [JSN] | |||
| R2-124678 | Impact of UL MIMO to MAC specifications | other | InterDigital | R2-79 | - | [WTS] [JSN] | |||
| R2-124679 | Draft LS to RAN4 on glitch handling | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124680 | Discussion on PDCP SN overallocation | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124681 | Discussion on MAC padding test cases | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124682 | Draft LS to RAN5 on MAC padding test cases | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124683 | Report of email discussion[79#35] [LTE/Other] RoHC Context Continuation | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124684 | CR to 36.331 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124685 | CR to 36.323 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124686 | CR to 36.306 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124687 | Discussion on mandating CSI/SRS transmission during uncertain period | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124688 | CR to 36.321 on mandating CSI/SRS transmission during the uncertain period if CSI/SRS and other uplink transmissions collide | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124689 | Discussion on DRX cycle and CSI/SRS transmission | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124690 | CR to 36.321 on CSI/SRS transmission during DRX cycle change | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124691 | Discussion on the extended PDCP SN and PDCP status report | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124692 | CR to 36.323 on introducing transmitter window to avoid HFN desync problem | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124693 | Draft LS to RAN3 on extended PDCP SN and the size of BITMAP | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124694 | Discussion on proposals to enhance DRX | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124695 | Details on disabling suspension | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124696 | CR to 36.321 on disabling suspension | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124697 | CR to 36.331 on disabling suspension | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124698 | Clarification on the setting of CSFB Indicator in RRC Connection Request | other | NTT DOCOMO INC, ZTE | R2-79 | - | [WTS] [JSN] | |||
| R2-124699 | Discussion on glitch handling | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124700 | Consideration on the content of accessibility measurement reporting | other | ITRI | R2-79 | - | [WTS] [JSN] | |||
| R2-124701 | Dedicated signalling of SIB1 | other | Nokia Siemens Networks, Nokia Corporation, Renesas Mobile Europe Ltd, InterDigital Communications, Motorola Mobility | R2-79 | - | [WTS] [JSN] | |||
| R2-124702 | CR on dedicated signalling of SIB1 | other | Nokia Siemens Networks, Nokia Corporation, Renesas Mobile Europe Ltd, InterDigital Communications, Motorola Mobility | R2-79 | - | [WTS] [JSN] | |||
| R2-124703 | DSAC/PPAC update for Cell_DCH UE | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124704 | Redirection Enhancement to HRPD | other | China Telecom, ZTE Corporation, Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-124705 | DSAC&PPAC update for Cell_DCH UE | other | Huawei, HiSilicon, NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124706 | Draft CR 36.331: Redirection Enhancement to HRPD | other | China Telecom, ZTE Corporation, Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-124707 | Draft CR 36.331: Redirection Enhancement to HRPD | other | China Telecom, ZTE Corporation, Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-124708 | Draft CR 36.306: Redirection Enhancement to HRPD | other | China Telecom, ZTE Corporation, Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-124709 | Draft CR 36.306: Redirection Enhancement to HRPD | other | China Telecom, ZTE Corporation, Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-124710 | Remaining issues on Periodic CSI and SRS | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124711 | RAN2 impacts on the minimum measurement capability for E-UTRA capable UE | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124712 | Consideration on configuration for E-UTRA Measurement | other | Huawei, HiSilicon, Telenor | R2-79 | - | [WTS] [JSN] | |||
| R2-124713 | Clarification on inter-RAT handover | other | HTC | R2-79 | - | [WTS] [JSN] | |||
| R2-124714 | CR on rSRVCC capability indicator to 25.306 | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124715 | CR to 25.331 on the Introduction of rSRVCC feature | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124716 | Clarification on ETWS reception | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124717 | CR to 36.300 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124718 | Discussion of the remaining issues on the rSRVCC handover | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124719 | Clarifications on how UE applies EAB info upon connection establishment in LTE | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124720 | Clarification of SIB14 acquisition | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124721 | Further discussion on prohibit timer for PPI | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124722 | Handling of handover for PPI | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124723 | Simplification of Power Preference Indication | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124724 | Reception of LTE Common Channels under IDC Interference | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124725 | Inter-RAT mobility for UE under IDC interference | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124726 | IDC capability | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124727 | Discussion on open issues for stand-alone HS-DPCCH | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124728 | Discussion on UE Behavior in 2nd DRX upon reception of Fallback to R99 Indication | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124729 | Discussion on FE-FACH Sub-feature dependency | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124730 | Clarifications on initial serving grant setting for secondary uplink carrier | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124731 | Cell reselection during uplink transmission with common E-DCH | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124732 | Clarification on V field in Extended PHR MAC CE | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124733 | Clarification on V field in Extended PHR MAC CE | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124734 | Discussion on UTRA R11 features and UE capabilities | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124735 | PDCP SN size change at HO | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124736 | Battery saving by configurable Active Time for the pending SR | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124737 | Draft CR to 36.321 for Battery saving by configurable Active TIme for the pending SR | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124738 | Quick stopping of the uplink transmission by TAT expiry command | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124739 | Half-duplex operation for cell-specific TDD Configuration in CA | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124740 | Draft CR to 36.321 for Half-duplex operation for cell-specific TDD Configuration in CA | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124741 | IDC indications prohibition mechanism | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124742 | Draft CR to 36.321 for correction of drx-RetransmissionTimer definition | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124743 | CSI and SRS reporting in DRX operation | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124744 | Draft CR to 36.321 for CSI and SRS reporting in DRX operation | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124745 | The remaining issues of IDC procedure | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124746 | Discussion on lossless PDCP SN length switch | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124747 | 36323 CR on lossless PDCP SN length switch | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124748 | Discussion on CA glitch issue | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124749 | Discussion on multiband indication | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124750 | CSI/SRS reporting in long DRX | other | Sharp | R2-79 | - | [WTS] [JSN] | |||
| R2-124751 | Clarification on RAR and SR related to DRX | other | ETRI | R2-79 | - | [WTS] [JSN] | |||
| R2-124752 | MBMS Service Continuity for Inter-RAT Mobility | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124753 | Correction of Traffic Volume Indicator in Cell Update message | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124754 | Discussion on TAT stop MAC CE | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124755 | Discussion on PPI prohibit mechanism | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124756 | Discussion on MDT measurement mode | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124757 | Clarification on RPLMN and MDT PLMN List for logged MDT | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124758 | MAC impact of R4 SCell activationdeactivation discussion | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124759 | Glitch upon SCell configuration/de-configuration | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124760 | IDC in case of carrier aggregation | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124761 | Remaining issues for CSI and SRS reporting in DRX | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124762 | Glitch upon SCell configuration/de-configuration | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124763 | Stage 2 CR on adding Scell deactivation as FDM solution for CA IDC scenario | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124764 | Consideration on Multi-TA Capability | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124765 | UE behaviour in IDC phase 2 | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124766 | ContentionDetected for connEStFail report | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124767 | ContentionDetected for connEStFail report | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124768 | Need of failure handling of SIB1 acquisition | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124769 | Stage 2 CR on clarifying UE behaviour in IDC phase 2 | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124770 | Resolving priority conflict | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124771 | Storing RLF at selected PLMN | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124772 | RRM/CQI/RLM measurement in different phases of IDC | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124773 | Storing RLF at selected PLMN | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124774 | Stage 2 CR on RRM/CQI/RLM measurement in different phases of IDC | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124775 | Corrections on mobility to CSG and hybrid cells | other | New Postcom, Nokia Siemens Networks, ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124776 | Corrections on mobility to CSG and hybrid cells | other | New Postcom, Nokia Siemens Networks, ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124777 | Considerations on PCell change without handover | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124778 | Over all signaling for IDC | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124779 | Consideration on TAG change upon handover | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124780 | Consideration on additional information in RLF report for inter-RAT MRO | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124781 | UE behavior in IDC incapable network | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124782 | Stage-2 CR Over all signaling for IDC | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124783 | Applicability of power backoff for IDC | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124784 | CR to 36.331 to resolve remaining FFS for power preference indication | other | ASUSTeK | R2-79 | - | [WTS] [JSN] | |||
| R2-124785 | Adding necessary information in RLF report to support inter RAT MRO | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124786 | Adding necessary information in RLF report to support inter RAT MRO | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124787 | Small corrections on TS36.331 | other | HTC | R2-79 | - | [WTS] [JSN] | |||
| R2-124788 | Clarification on the stop of T340 | other | HTC | R2-79 | - | [WTS] [JSN] | |||
| R2-124789 | Draft Reply LS to S3-120805 = R2-123228 on PWS key distribution | other | Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-124790 | Long/Short DRX cycle handling during drx-InactivityTimer | other | Ericsson, ST-Ericsson, LG Electronic Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124791 | Remaining issues for CSI and SRS reporting in DRX | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124792 | Long/Short DRX cycle handling during drx-InactivityTimer | other | Ericsson, ST Ericsson, LG Electronic Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124793 | CR to 36.331 on power preference indication | other | Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124794 | Discussion about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | other | New Postcom, TD-TECH | R2-79 | - | [WTS] [JSN] | |||
| R2-124795 | Considerations on power preference indication | other | Nokia Corporation, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124796 | Introduction of Rel-11 UE capabilities | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124797 | Introduction of optional and conditionally mandatory features for Rel-11 UE | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124798 | Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | other | New Postcom, TD-TECH | R2-79 | - | [WTS] [JSN] | |||
| R2-124799 | E-TFC selection for UL MIMO | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124800 | RAN2 impacts due to UL MIMO plus 64QAM | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124801 | Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | other | New Postcom, TD-TECH | R2-79 | - | [WTS] [JSN] | |||
| R2-124802 | Dual-stream restriction for 4-branch MIMO | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124803 | Update of 4Tx-HSDPA stage-2 | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124804 | L2 buffer sizes for 4Tx-HSDPA and UL MIMO with 64QAM combinations | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124805 | Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | other | New Postcom, TD-TECH | R2-79 | - | [WTS] [JSN] | |||
| R2-124806 | Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | other | New Postcom, TD-TECH | R2-79 | - | [WTS] [JSN] | |||
| R2-124807 | Introduction of UL MIMO with 64QAM in TS 25.319 | other | Nokia Siemens Networks, Ericsson, ST-Ericsson, Qualcomm Incorporated, InterDigital Communications | R2-79 | - | [WTS] [JSN] | |||
| R2-124808 | Clarification of absolute priority based measurements and reselection in CELL_FACH State | other | Ericsson, ST-Ericsson, Renesas | R2-79 | - | [WTS] [JSN] | |||
| R2-124809 | Introduction of UL MIMO with 64QAM in TS 25.302 | other | Nokia Siemens Networks, Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124810 | Introduction of UL MIMO with 64QAM in TS 25.321 | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124811 | Clarification of absolute priority based measurements and reselection in CELL_FACH State | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124812 | Introduction of UL MIMO with 64QAM in TS 25.331 | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124813 | Introducion of wideband RSRQ measurements | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124814 | Introduction of wideband RSRQ measurements | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124815 | Introduction of UL MIMO with 64QAM in TS 25.331 (ASN.1) | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124816 | Introduction of a periodic measurement for DC-HSUPA | other | Renesas Mobile Europe Ltd, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124817 | Introduction of a periodic measurement for DC-HSUPA | other | Renesas Mobile Europe Ltd, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124818 | Handling of the roaming subscribers in case of RRC Connection Reject | other | Vodafone | R2-79 | - | [WTS] [JSN] | |||
| R2-124819 | Common E-DCH deactivation via BCCH modification | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124820 | Glitch handling for intra-band carrier aggregation | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124821 | Cell Update message size limitation | other | Renesas Mobile Europe Ltd, NTT DoCoMo, INC | R2-79 | - | [WTS] [JSN] | |||
| R2-124822 | Active time for scheduling request | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124823 | IE 'failure cause' omission for the cell update message reduction | other | Renesas Mobile Europe Ltd, NTT DoCoMo, INC | R2-79 | - | [WTS] [JSN] | |||
| R2-124824 | Miscellaneous corrections | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124825 | IE 'failure cause' omission for the cell update message reduction | other | Renesas Mobile Europe Ltd, NTT DoCoMo, INC | R2-79 | - | [WTS] [JSN] | |||
| R2-124826 | Clarification on "handover to E-UTRA" | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124827 | Removal of FFS on initial PPI transmission | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124828 | Later release extensions for CellUpdate message | other | Renesas Mobile Europe Ltd, NTT DoCoMo, INC | R2-79 | - | [WTS] [JSN] | |||
| R2-124829 | UE handling of InterRAT HO command | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124830 | Clarification on QoS verification configuration and report | other | ZTE Corporation, China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124831 | Correction for SR-VCC procedure during a cell update procedure | other | Renesas Mobile Europe Ltd, Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124832 | Fast Dormancy issue in CELL_PCH or URA_PCH state | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124833 | Fast Dormancy issue in CELL_PCH or URA_PCH state | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124834 | Fast Dormancy issue in CELL_PCH or URA_PCH state | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-124835 | Discussion of UM RLC ciphering error detection and recovery for IMS voice | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124836 | Clarification on QoS verification configuration and report | other | ZTE Corporation, China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124837 | Considerations on Multiple PLMN support | other | ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124838 | Capability signalling for measurements of configured carriers without compressed mode | other | Renesas Mobile Europe Ltd, Broadcom Corporation, Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124839 | CLTD activation/deactivation | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124840 | sTAG release at re-establishmen | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124841 | [DRAFT] Reply LS on additional information in RLF Report for inter-RAT MRO | other | New Postcom | R2-79 | - | [WTS] [JSN] | |||
| R2-124842 | Cell update-less RLC unrecoverable error reporting and recovery | other | Renesas Mobile Europe Ltd, Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124843 | Delay in checking SRB 1-4 mapping on PCH to FACH transition | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124844 | Location of the field secTAG-ToReleaseList and secTAG-ToAddModList | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124845 | Introduction of RLC re-establishment via reconfiguration | other | Renesas Mobile Europe Limited, Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124846 | PWS reception in limited service mode | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124847 | PWS reception in limited service mode | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124848 | Introduction of RLC re-establishment via reconfiguration | other | Renesas Mobile Europe Limited, Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124849 | Cleanup of TS36.305 | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124850 | Fast Dormancy Behaviour and Need for Rel11 Enhancement | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124851 | [79#32] LTE/feICIC: SIB1 provisioning via dedicated signalling | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124852 | Introduction of cell update-less RLC unrecoverable error reporting | other | Renesas Mobile Europe Limited, Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124853 | Handling of 1xCSFB failure | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124854 | Draft response LS on reporting the UE E-UTRAN Capabilities for rSRVCC from GERAN to E-UTRAN | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124855 | On cellForWhichToReportCGI for GERAN cells | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124856 | Introduction of cell update-less RLC unrecoverable error reporting | other | Renesas Mobile Europe Limited, Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124857 | SIB1 provisioning via dedicated signalling: Alternative 1 | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124858 | SIB1 provisioning via dedicated signalling: Alternative 2 | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124859 | SIB1 provisioning via dedicated signalling: Alternative 3 | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124860 | Clarification of Multiflow MIMO capability signalling | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124861 | SIB1 provisioning via dedicated signalling: open issues | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124862 | Periodic Measurement Reporting | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124863 | Behaviour in case of excessive dedicated priority information | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124864 | Behaviour in case of excessive dedicated priority information | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124865 | Clarification on PDCCH monitoring | other | Acer Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124866 | Clarification on PDCCH monitoring | other | Acer Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124867 | Remaining issues on PPI handling | other | Potevio | R2-79 | - | [WTS] [JSN] | |||
| R2-124868 | System information acquisition with valid duration restriction | other | Potevio | R2-79 | - | [WTS] [JSN] | |||
| R2-124869 | Some clarification to Carrier aggregation enhancements | other | HTC | R2-79 | - | [WTS] [JSN] | |||
| R2-124870 | Clarification on PDCCH monitoring | other | Acer Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124871 | Clarification on PDCCH monitoring | other | Acer Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124872 | Clarification on flushing HARQ buffer for Msg3 | other | Acer Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124873 | Optimization of RACH in Rel-11 | other | HTC | R2-79 | - | [WTS] [JSN] | |||
| R2-124874 | TAGs handling upon HO | other | HTC | R2-79 | - | [WTS] [JSN] | |||
| R2-124875 | Discussion on FFS aspects of UEAssistanceInformation procedure | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124876 | Correction on 'Power preference indication' and removal of prohibit timer T340. | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124877 | Correction on 'Power preference indication' | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124878 | IDC Indication Prohibition | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124879 | Distinguishing RACH parameters for PCell and SCell | other | HTC | R2-79 | - | [WTS] [JSN] | |||
| R2-124880 | Power saving with fast release of CSI\SRS | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124881 | Analysis of IMD problem in IDC | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124882 | Handling the FFS regarding initial PPI transmission | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124883 | Handling the FFS regarding T340 for PPI | other | Research In Motion UK Ltd, ZTE Corporation, Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124884 | Open aspects of UE assistance information | other | Research In Motion UK Ltd, Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124885 | Remaining Issues of dedicated SIB-1 delivery in FeICIC | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124886 | PPI signalling during handover | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-124887 | Fallback to R99 PRACH capability indication | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124888 | On UE capabilities for Rel-11 | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124889 | Clarification for standalone periodic SI when TEBS=0 | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124890 | Clarifications for Logging of Connection Establishment Failure Information | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124891 | Intoducing handling of eSCC with multiflow | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124892 | Exclusion of Cells for inter frequency detected cells | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124893 | Source Cell Id in CELL UPDATE | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124894 | DRAFT Response LS on Clarifications on a solution for Femto to Femto and Femto to Macro CELL FACH mobility | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-124895 | New information in SCRI message for UMTS Fast dormancy | other | Nokia Siemens Networks, China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124896 | More analysis on UE reports more information in UMTS Fast Dormancy | other | Nokia Siemens Networks, China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124897 | Way forward on UMTS Fast dormancy issue | other | Nokia Siemens Networks, China Unicom | R2-79 | - | [WTS] [JSN] | |||
| R2-124898 | MAC layer support of half-duplex UEs in TDD inter-band CA | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124899 | SRS reporting for UL transmisssion | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-124900 | CR on MAC layer support of ePDCCH | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124901 | MAC layer support of ePDCCH | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124902 | DRAFT reply to LS on Clarifications on a solution for Femto to Femto and Femto to Macro CELLFACH mobility | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124903 | Considerations on Cell Update Message size | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124904 | Report of email discussion [79#31] Joint/MDT: Scheduled IP throughput measurement as specified in 36.314 | other | Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-124905 | Updates for MDT UL scheduled IP throughput measurement | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124906 | Open issues for RRM and RLM measurements with IDC interference | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124907 | Updates for scheduled IP throughput for MDT in UL | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124908 | CR on open issues for RRM and RLM measurements with IDC interference | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124909 | Details of IDC indication prohibit timer | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124910 | PCH to Idle Fast Dormancy | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124911 | Introduction of MDT accessibility measurements | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124912 | Correction to INTER RAT HANDOVER INFO for UMTS TDD/FDD capable UE | other | Renesas Mobile Europe Ltd, Broadcom Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124913 | CR on details of IDC indication prohibit timer | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124914 | Correction to INTER RAT HANDOVER INFO for UMTS TDD/FDD capable UE | other | Renesas Mobile Europe Ltd, Broadcom Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124915 | Correction to INTER RAT HANDOVER INFO for UMTS TDD/FDD capable UE | other | Renesas Mobile Europe Ltd, Broadcom Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124916 | Validity of EAB SIB and acquisition of SIB1 | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124917 | EUTRAN TDD/FDD Split for FGI2 in UTRAN | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124918 | EUTRAN TDD/FDD Split for FGI2 in UTRAN | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124919 | EUTRAN TDD/FDD Split for FGI2 in UTRAN | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124920 | Notification of the IMS Information and Security Keys for rSRVCC | other | Renesas Mobile Europe Ltd, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124921 | Introduction of MDT accessibility measurements | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124922 | Introduction of rSR-VCC | other | Renesas Mobile Europe Ltd, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124923 | Open Issues on Accessibility Measurement | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124924 | [draft] Reply LS on Notification of IMS Information for CS to PS SRVCC | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-124925 | Additional information in the RLF report | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124926 | Introducing support for Coordinated Multi-Point (CoMP) operation in DL | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-124927 | Draft reply LS to R3-122016 = R2-124381 on additional information in RLF report for inter RAT MRO (to: RAN3; cc: -; contact: Huawei) | other | Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-124928 | Capture of enhancement of RLF report for inter-RAT MRO | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124929 | Additional information in the RLF report | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124930 | Correction on MDT multi-PLMN | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124931 | Multiple Frequency Band Indicators feature | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124932 | Multiple Frequency Band Indicators feature | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124933 | Multiple Frequency Band Indicators feature | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124934 | Multiple Frequency Band Indicators feature | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124935 | RRC support for CoMP in UL | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124936 | Prioritisation for Multiple Frequency Band | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124937 | Prioritisation for Multiple Frequency Band | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124938 | Prioritisation for Multiple Frequency Band | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124939 | Prioritisation for Multiple Frequency Band | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124940 | Clarification on UE support and prioritisation between bands for Multiple Frequency Band Indicators | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124941 | Clarification on UE support and prioritisation between bands for Multiple Frequency Band Indicators | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124942 | Multiple frequency band indicators per cell | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124943 | Multiple frequency band indicators per cell | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124944 | Multiple frequency band indicators per cell | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124945 | Multiple frequency band indicators per cell | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124946 | Multiple frequency band indicators per cell | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124947 | Multiple frequency band indicators per cell | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124948 | Multiple frequency band indicators per cell | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124949 | Further considerations on In-device Coexistence of band 7 and ISM | other | Motorola Mobility | R2-79 | - | [WTS] [JSN] | |||
| R2-124950 | Multiple frequency band indicators per cell | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124951 | Maintenance of up-to-date SIB1 in CRE zone | other | Motorola Mobility | R2-79 | - | [WTS] [JSN] | |||
| R2-124952 | Report of [78#58] LTE: CDMA2000 network sharing | other | Alcatel-Lucent (Rapporteur) | R2-79 | - | [WTS] [JSN] | |||
| R2-124953 | Introduction of network sharing for CDMA2000 inter-working | other | Alcatel-Lucent, Clearwire, Qualcomm Incorporated, Sprint, NEC | R2-79 | - | [WTS] [JSN] | |||
| R2-124954 | Introduction of network sharing for CDMA2000 inter-working | other | Alcatel-Lucent, Clearwire, Qualcomm Incorporated, Sprint | R2-79 | - | [WTS] [JSN] | |||
| R2-124955 | RAN overload control using RRC connection Rejection | other | Alcatel-Lucent, Nokia Siemens Networks, Nokia Corporation, Ericsson, ST Ericsson, Verizon, Vodafone, Intel Corporation, MediaTek Inc, Qualcomm Incorporate, LG Electronics Inc | R2-79 | - | [WTS] [JSN] | |||
| R2-124956 | Correction to the IE 'Timing maintained Synchronization indicator' for F-DPCH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124957 | Corrections of the UE behavior when variable E_RNTI is not set in CELL_PCH state | other | Qualcomm Incorporated, Renesas Mobile Europe Ltd, Broadcom Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124958 | Further clarification for UE behaviour on RLC unrecoverable error when UE has not received L2 Ack for a reconfiguration complete message | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124959 | Fast dormancy optimization | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124960 | Enhancement to periodic Cell Update | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124961 | PDCCH monitoring during adaptive UL retransmission grants | other | Ericsson, ST-Ericsson, Broadcom, Qualcomm | R2-79 | - | [WTS] [JSN] | |||
| R2-124962 | DRX during UL scheduling | other | Ericsson, ST-Ericsson, Broadcom, Qualcomm | R2-79 | - | [WTS] [JSN] | |||
| R2-124963 | Corrections to MBMS Service Continuity | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124964 | Finalizing the UE power preference indication | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124965 | Clarifying the use of the UE power preference indication | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124966 | LTE DL Autonomous Denials and ETWS | other | Sharp | R2-79 | - | [WTS] [JSN] | |||
| R2-124967 | RRC signaling for CA enhancements | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124968 | Open issues of in-device coexistence | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124969 | EPDCCH impact on drx-InactivityTimer | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124970 | Introduction of EPDCCH in MAC | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124971 | Multi-TA capability | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124972 | MDT Reporting and Logging Events | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124973 | DRX operation for EPDCCH | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124974 | Enhancements in DRX operation | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124975 | Correction on running timers | other | Acer Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124976 | SR transmission while simultaneous PUCCH and PUSCH transmssion is configured | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124977 | Correction on running timers | other | Acer Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124978 | Corrections to RAN5 Test Case 7.1.4.10 on MAC padding | other | Intel Corporation, LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-124979 | SR transmission while simultaneous PUCCH and PUSCH transmssion is configured | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124980 | Draft LS on corrections to the test case on MAC padding | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124981 | Introduction of a new MAC CE for CSI/SRS | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124982 | Correction on running timers | other | Acer Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124983 | Introduction of a new MAC Control Element | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124984 | Correction on running timers | other | Acer Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124985 | Transmissions of UE initiated messages immediately after RRC Connection Reestablishment | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R2-79 | - | [WTS] [JSN] | |||
| R2-124986 | Analysis of Power Preference Indication Timer | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124987 | Clarification related to CA enhancement in MAC | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-124988 | CSI Process and Feedback Configuration for DL CoMP | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124989 | Clarification of CA UE capability | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R2-79 | - | [WTS] [JSN] | |||
| R2-124990 | Introducing support for Uplink Coordinated Multi-Point (CoMP) Operation | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-124991 | CA enhancement RRC L1 parameters | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R2-79 | - | [WTS] [JSN] | |||
| R2-124992 | Frequency specific compressed mode for the non-adjacent carrier allocation | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-124993 | Traffic volume Threshold FE-CELL_FACH UEs | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124994 | Emergency calls and FE-FACH | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124995 | CELL_FACH Feature Bundling | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124996 | Fallback to RACH R99 and 2nd DRX cycle interaction | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-124997 | Stage 2 for the FeICIC | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124998 | Clarification to Lost LPP Acknowledgement Message | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-124999 | Clarification to Lost LPP Acknowledgement Message | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-125000 | Handling of Improper Autonomous Denial Rate Configuration | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-125001 | Discussion on CSI/SRS reporting and power saving | other | HTC | R2-79 | - | [WTS] [JSN] | |||
| R2-125002 | Physical layer parameters to be configured by RRC | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125003 | Initializing power saving preference and handling of PPI upon handover | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125004 | Report of email discussion [79#31] Joint/MDT: Scheduled IP throughput measurement as specified in 36.314 | other | Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-125005 | Report of RAN2 #79, Qingdao, China, 13.08.-17.08.2012 | other | ETSI MCC | R2-79 | - | [WTS] [JSN] | |||
| R2-125006 | RAN WG2 compendium v17.0 | other | ETSI MCC | R2-79 | - | [WTS] [JSN] | |||
| R2-125007 | LS response to R3-121963 = R2-124389 on contents of Handover Required message for rSRVCC (S2-124044; contact: Huawei) | other | SA2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125008 | [draft] Reply LS on Notification of IMS Information for CS to PS SRVCC | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-125009 | Adding necessary information in RLF report to support inter RAT MRO | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125010 | Parallel transmissions of SRS and PUSCH/PUCCH in different TAGs | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125011 | Fast Dormancy issue in CELL_PCH or URA_PCH state | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-125012 | Considerations on Cell Update Message size | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125013 | Draft reply LS to GP-121166 = R2-124375 on EUTRA message in PS HANDOVER COMMAND (to GERAN2; cc: -; contact: NSN) | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125014 | Draft response LS to GP-121171 = R2-124386 on reporting the UE E-UTRAN Capabilities for rSRVCC from GERAN to E-UTRAN (to: GERAN2; cc: -; contact: Huawei) | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125015 | Draft reply LS to R4-125009 = R2-124383 on UE measurements in support of the two-stage MIMO OTA test method (to RAN4; cc: RAN1; contact: Nokia) | other | Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125016 | Draft Reply LS to S3-120805 = R2-123228 on PWS key distribution (to: SA3; cc: CT1, SA2, RAN3, GERAN2; contact: Huawei) | other | Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-125017 | On the UE capabilities of Rel11 features | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-125018 | Extension of band and ARFCN | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125019 | Extending E-UTRA Frequency Band and EARFCN value range | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125020 | Reply LS to R4-124948 = R2-124396 on extending E-UTRA band number and EARFCN numbering space (to: RAN4; cc: GERAN, RAN3; contact: Samsung) | other | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125021 | Reply LS to S2-123399 = R2-123236 on Inter RAT handover, Inter RAT Release with redirection, Inter RAT Reject with redirection between E-UTRAN and UTRAN (to SA2; cc: RAN3; contact: NTT DOCOMO) | other | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125022 | Active time for scheduling request | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-125023 | EUTRAN TDD/FDD Split for FGI2 in UTRAN | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-125024 | EUTRAN TDD/FDD Split for FGI2 in UTRAN | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-125025 | EUTRAN TDD/FDD Split for FGI2 in UTRAN | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-125026 | MDT Open Issues Resolutions | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-125027 | Correction of the signaling for Uncertainty and Confidence | other | CATT | R2-79 | - | [WTS] [JSN] | |||
| R2-125028 | Clarifications for Logging of Connection Establishment Failure Information | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-125029 | Introduction of MDT accessibility measurements | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125030 | Introduction of MDT accessibility measurements | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125031 | Draft LS on REL-8 IE "Warning Security Information" (to: CT1; cc: -; contact: ST-Ericsson) | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125032 | Draft reply LS to R3-122016 = R2-124381 on RLF report for inter RAT MRO | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125033 | RAN overload handling using RRC Reject | other | Nokia Siemens Networks, Nokia Corporation, Alcatel-Lucent, Ericsson, ST Ericsson, Verizon, Vodafone, Intel Corporation, MediaTek Inc, Qualcomm Incorporate, LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-125034 | RAN overload control using RRC connection Rejection | other | Alcatel-Lucent, Nokia Siemens Networks, Nokia Corporation, Ericsson, ST Ericsson, Verizon, Vodafone, Intel Corporation, MediaTek Inc, Qualcomm Incorporate, LG Electronics Inc | R2-79 | - | [WTS] [JSN] | |||
| R2-125035 | Correction to absolute priority cell reselection | other | TeliaSonera | R2-79 | - | [WTS] [JSN] | |||
| R2-125036 | Correction to absolute priority cell reselection | other | TeliaSonera | R2-79 | - | [WTS] [JSN] | |||
| R2-125037 | Clarification on the setting of CSFB Indicator in RRC Connection Request | other | NTT DOCOMO INC, ZTE | R2-79 | - | [WTS] [JSN] | |||
| R2-125038 | CR on physical parameters for CA-enhancements | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125039 | Draft reply LS to S2-123399 = R2-123236 on Inter RAT handover, Inter RAT Release with redirection, Inter RAT Reject with redirection between E-UTRAN and UTRAN (to SA2; cc: RAN3; contact: NTT DOCOMO) | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-125040 | CR to 25.331 on the Introduction of rSRVCC feature | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125041 | Introduction of 4Tx-HSDPA in 25.302 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125042 | Introduction of 4Tx-HSDPA in 25.321 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125043 | Introduction of 4Tx-HSDPA in 25.331 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125044 | Update of 4Tx-HSDPA stage-2 | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125045 | Introduction of 4Tx-HSDPA in 25.306 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125046 | Clarification of absolute priority based measurements and reselection in CELL_FACH State | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125047 | Removing UE behavior discrepancy upon radio link failure and ongoing re-configuration | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125048 | Removal of SR-VCC triggered by cell update confirm | other | Renesas Mobile Europe Ltd, Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125049 | Corrections to intra-UTRAN SR-VCC handover procedure | other | Intel Corporation, Renesas Mobile Europe Ltd, Broadcom Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125050 | Introduction of a periodic measurement for DC-HSUPA | other | Renesas Mobile Europe Ltd, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125051 | Introduction of a periodic measurement for DC-HSUPA | other | Renesas Mobile Europe Ltd, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125052 | IE 'failure cause' omission for the cell update message reduction | other | Renesas Mobile Europe Ltd, NTT DoCoMo, INC | R2-79 | - | [WTS] [JSN] | |||
| R2-125053 | IE 'failure cause' omission for the cell update message reduction | other | Renesas Mobile Europe Ltd, NTT DoCoMo, INC | R2-79 | - | [WTS] [JSN] | |||
| R2-125054 | Clarification to the handling of IE Different Tx diversity mode configuration from serving HS-DSCH cell | other | Broadcom Corporation, Renesas Mobile Europe Ltd | R2-79 | - | [WTS] [JSN] | |||
| R2-125055 | Corrections to Inter-frequency detected set measurements | other | Intel Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125056 | Correction to the IE 'Timing maintained Synchronization indicator' for F-DPCH | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-125057 | Clarification for standalone periodic SI when TEBS=0 | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-125058 | Introduction of further Multiflow agreements in TS 25.306. | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125059 | Draft LS on 2nd DRX cycle and fallback to PRACH R99 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125060 | Corrections to intra-UTRAN SR-VCC handover procedure | other | Intel Corporation, Renesas Mobile Europe Ltd, Broadcom Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125061 | Introduction of UL MIMO with 64QAM in TS 25.319 | other | Nokia Siemens Networks, Ericsson, ST-Ericsson, Qualcomm Incorporated, InterDigital Communications | R2-79 | - | [WTS] [JSN] | |||
| R2-125062 | Introduction of UL MIMO with 64QAM in TS 25.302 | other | Nokia Siemens Networks, Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125063 | Introduction of MIMO with 64QAM HSUPA in 25.306 | other | Ericsson, ST-Ericsson, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125064 | Introduction of UL MIMO with 64QAM in TS 25.321 | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125065 | Introduction of UL MIMO with 64QAM in TS 25.331 | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125066 | Correction to ACK-NACK repetition factor for Multiflow assisting cells | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125067 | Introduction of additional values for DeltaACK and DeltaNACK | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125068 | Correction to MAC-hs reset procedure for Multiflow | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125069 | Draft LS Reply on synchronisations handling in HSDPA Multiflow | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125070 | CR on rSRVCC capability indicator to 25.306 | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125071 | LS on 2nd DRX cycle and fallback to PRACH R99 (to: RAN3; cc: -; contact: Ericsson) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125072 | [draft] Reply LS on Notification of IMS Information for CS to PS SRVCC | other | Renesas Mobile Europe Ltd. | R2-79 | - | [WTS] [JSN] | |||
| R2-125073 | Update of 4Tx-HSDPA stage-2 | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125074 | Draft LS Reply on synchronisations handling in HSDPA Multiflow | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125075 | Reply LS to R1-123946 = R2-124257 on synchronisations handling in HSDPA Multiflow (to: RAN1; cc: -; contact: Ericsson) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125076 | Reply LS to S2-123426 = R2-123239 on Notification of IMS Information for CS to PS SRVCC (to: SA2; cc: CT1, GERAN2, RAN3; contact: Renesas) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125077 | Introduction of 4Tx-HSDPA in 25.321 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125078 | Introduction of Further Enhancements to CELL_FACH in 25.306 | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-125079 | Introduction of Further Enhancements to CELL_FACH in 25.321 | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-125080 | Introduction of Further Enhancements to CELL_FACH in 25.331 | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-125081 | Introduction of 4Tx-HSDPA in 25.306 | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125082 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125083 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125084 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125085 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125086 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125087 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125088 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125089 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125090 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125091 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125092 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125093 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125094 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125095 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125096 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125097 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125098 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125099 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125100 | Cleanup of TS36.305 | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125101 | Clarification on DRX for Relay | other | ASUSTeK, CATT, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125102 | Clarification on DRX for Relay | other | ASUSTeK, CATT, Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125103 | Draft LS on ncc-Permitted coding (to: RAN5; cc: -; contact: Nokia) | other | Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125104 | Finalizing the UE power preference indication | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125105 | Clarifying the use of the UE power preference indication | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125106 | On cellForWhichToReportCGI for GERAN cells | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125107 | Report of Rel-11 UE capability Ad-hoc session | other | NTT DOCOMO | R2-79 | - | [WTS] [JSN] | |||
| R2-125108 | Addition of the stage-2 agreements on IDC | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125109 | Addition of the stage-3 agreements on IDC | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125110 | Introduction of network sharing for CDMA2000 inter-working | other | Alcatel-Lucent, Clearwire, Qualcomm Incorporated, Sprint, NEC, Leap Wireless | R2-79 | - | [WTS] [JSN] | |||
| R2-125111 | Overallocation of PDCP SN | other | Ericsson, ST-Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125112 | Report of the LTE UP ad hoc meeting | other | LG Electronics (Vice-Chairman) | R2-79 | - | [WTS] [JSN] | |||
| R2-125113 | CR to 36.331 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125114 | CR to 36.323 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125115 | CR to 36.300 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125116 | LS on extended PDCP SN and the size of BITMAP (to: RAN3; cc: -; contact: Samsung) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125117 | Clarification of the Note in 5.2 | other | Research In Motion UK Limited | R2-79 | - | [WTS] [JSN] | |||
| R2-125118 | Corrections on mobility to CSG and hybrid cells | other | New Postcom, Nokia Siemens Networks, ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125119 | Corrections on mobility to CSG and hybrid cells | other | New Postcom, Nokia Siemens Networks, ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125120 | Corrections to MBMS Service Continuity | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125121 | Some clarification to Carrier aggregation enhancements | other | HTC | R2-79 | - | [WTS] [JSN] | |||
| R2-125122 | Correction on 'Power preference indication' | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-125123 | LS on Uplink Positioning Parameters (R3-122373; contact: Ericsson) | other | RAN3 | R2-79 | - | [WTS] [JSN] | |||
| R2-125124 | Clarification related to CA enhancement in MAC | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125125 | Report of offline discussion about SIB1 provisioning via dedicated signalling for further enhanced ICIC | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-125126 | Report of offline discussion about SIB1 provisioning via dedicated signalling for further enhanced ICIC | other | Qualcomm Incorporated | R2-79 | - | [WTS] [JSN] | |||
| R2-125127 | LS on ncc-Permitted coding (to: RAN5; cc: -; contact: Nokia) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125128 | Review in preparation of REL-11 ASN.1 freeze | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125129 | 25.331 REL-9/10/11 backward compatibility problem regarding RRC CONNECTION REQUEST | other | Renesas Mobile Europe Ltd | R2-79 | - | [WTS] [JSN] | |||
| R2-125130 | Correction to non-backwards compatible ASN.1 | other | Renesas Mobile Europe Ltd | R2-79 | - | [WTS] [JSN] | |||
| R2-125131 | Draft reply LS to R1-123058 = R2-123208 on MIB detection in feICIC (to: RAN1, RAN4; cc: RAN3; contact: Ericsson) | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125132 | Carrier Aggregation Enhancement RAN1 parameters | other | Nokia Corporation, Nokia Siemens Networks, Samsung, Intel, Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-125133 | RRC support for CoMP in UL | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125134 | Introduction of network sharing for CDMA2000 inter-working | other | Alcatel-Lucent, Clearwire, Qualcomm Incorporated, Sprint, NEC | R2-79 | - | [WTS] [JSN] | |||
| R2-125135 | Clarification on Radio link failure recovery | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125136 | Clarification on mobility related issues | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125137 | Carrier Aggregation Enhancement RAN1 parameters | other | Nokia Corporation, Nokia Siemens Networks, Samsung, Intel, Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-125138 | Corrections to MBMS Service Continuity | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125139 | Draft reply LS to R1-123058 = R2-123208 on MIB detection in feICIC (to: RAN1, RAN4; cc: RAN3; contact: Ericsson) | other | Ericsson | R2-79 | - | [WTS] [JSN] | |||
| R2-125140 | CR to 36.331 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125141 | Correction on MDT multi-PLMN | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125142 | CR to 36.323 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125143 | CR to 36.300 on introducing ROHC context continue for intra-ENB handover | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125144 | Clarification of MBMS Prioritisation | other | Nokia Siemens Networks | R2-79 | - | [WTS] [JSN] | |||
| R2-125145 | Open aspects of UE assistance information | other | Research In Motion UK Ltd, CATT, ZTE Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125146 | Draft reply LS to S1-121442 = R2-123223 on PWS Requirements for UEs in Limited Service State (to: SA1; cc: SA3, GERAN2; contact: Huawei) | other | Huawei | R2-79 | - | [WTS] [JSN] | |||
| R2-125147 | Review in preparation of REL-11 ASN.1 freeze | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125148 | RRC support for CoMP in UL | other | Huawei, HiSilicon | R2-79 | - | [WTS] [JSN] | |||
| R2-125149 | Clarification of SR period | other | LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-125150 | Miscellaneous corrections | other | Samsung | R2-79 | - | [WTS] [JSN] | |||
| R2-125151 | Draft LS on further MDT agreements in RAN2 | other | MediaTek Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-125152 | Draft reply LS to R4-125009 = R2-124383 on UE measurements in support of the two-stage MIMO OTA test method (to RAN4; cc: RAN1; contact: Nokia) | other | Nokia Corporation | R2-79 | - | [WTS] [JSN] | |||
| R2-125153 | RAN overload handling using RRC Reject | other | Nokia Siemens Networks, Nokia Corporation, Alcatel-Lucent, Ericsson, ST Ericsson, Verizon, Vodafone, Intel Corporation, MediaTek Inc, Qualcomm Incorporate, LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-125154 | Draft LS on 25.331 REL-9/10/11 backward compatibility problem regarding RRC CONNECTION REQUEST (to: RAN, RAN5; cc: -; contact: Renesas) | other | Renesas Mobile Europe Ltd | R2-79 | - | [WTS] [JSN] | |||
| R2-125155 | Reply LS to GP-121166 = R2-124375 on EUTRA message in PS HANDOVER COMMAND (to GERAN2; cc: -; contact: NSN) | other | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125156 | Reply LS to R4-125009 = R2-124383 on UE measurements in support of the two-stage MIMO OTA test method (to RAN4; cc: RAN1; contact: Nokia) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125157 | Reply LS to GP-121166 = R2-124375 on EUTRA message in PS HANDOVER COMMAND (to GERAN2; cc: RAN5; contact: NSN) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125158 | Reply LS to S1-121442 = R2-123223 on PWS Requirements for UEs in Limited Service State (to: SA1; cc: SA3, GERAN2, CT1; contact: Huawei) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125159 | Response LS to GP-121171 = R2-124386 on reporting the UE E-UTRAN Capabilities for rSRVCC from GERAN to E-UTRAN (to: GERAN2; cc: RAN3, SA2; contact: Huawei) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125160 | Reply LS to S3-120805 = R2-123228 on PWS key distribution (to: SA3; cc: CT1, SA2, RAN3, GERAN2; contact: Huawei) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125161 | LS on further MDT agreements in RAN2 (to: SA5, RAN3; cc: -; contact: MediaTek) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125162 | LS on REL-8 IE "Warning Security Information" (to: CT1, RAN3, CT4, GERAN2; cc: -; contact: ST-Ericsson) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125163 | RAN overload control using RRC connection Rejection | other | Alcatel-Lucent, Nokia Siemens Networks, Nokia Corporation, Ericsson, ST Ericsson, Verizon, Vodafone, Intel Corporation, MediaTek Inc, Qualcomm Incorporate, LG Electronics Inc | R2-79 | - | [WTS] [JSN] | |||
| R2-125164 | RAN overload handling using RRC Reject | other | Nokia Siemens Networks, Nokia Corporation, Alcatel-Lucent, Ericsson, ST Ericsson, Verizon, Vodafone, Intel Corporation, MediaTek Inc, Qualcomm Incorporate, LG Electronics Inc. | R2-79 | - | [WTS] [JSN] | |||
| R2-125165 | Correction to absolute priority cell reselection | other | TeliaSonera | R2-79 | - | [WTS] [JSN] | |||
| R2-125166 | Correction to absolute priority cell reselection | other | TeliaSonera | R2-79 | - | [WTS] [JSN] | |||
| R2-125167 | Reply LS to S2-123399 = R2-123236 on Inter RAT handover, Inter RAT Release with redirection, Inter RAT Reject with redirection between E-UTRAN and UTRAN (to SA2; cc: RAN3; contact: NTT DOCOMO) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125168 | LS on Correction to non-backwards compatible asn1 in 25.331 Rel-9/10/11 (to: RAN, RAN5; cc: -; contact: Renesas) | LS out | RAN2 | R2-79 | - | [WTS] [JSN] | |||
| R2-125169 | Correction on 'Power preference indication' | other | Alcatel-Lucent | R2-79 | - | [WTS] [JSN] | |||
| R2-125170 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125171 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125172 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125173 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125174 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125175 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125176 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125177 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125178 | Void | other | - | R2-79 | - | [WTS] [JSN] | |||
| R2-125179 | Void | other | - | R2-79 | - | [WTS] [JSN] |
810 documents (1.2375919818878 seconds)